75 FR 36551 - State Highway-Rail Grade Crossing Action Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...
ERIC Educational Resources Information Center
Virginia Polytechnic Inst. and State Univ., Blacksburg.
Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…
45 CFR 1386.36 - Final disapproval of the State plan or plan amendments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON DEVELOPMENTAL DISABILITIES, DEVELOPMENTAL DISABILITIES PROGRAM FORMULA GRANT PROGRAMS Federal Assistance to State Developmental Disabilities Councils § 1386.36 Final disapproval of the State plan or plan...
Career Plans of Final-Year South African Student Teachers: Migration to "Greener Pastures"?
ERIC Educational Resources Information Center
de Villiers, J. J. R.
2017-01-01
Teacher loss due to migration is a global phenomenon that impacts both developed and developing nations the world over. The aim of this study was to find out about the career plans of final-year South African student teachers. A group of final-year Bachelor of Education student teachers from a South African university responded to a questionnaire…
ERIC Educational Resources Information Center
System Development Corp., Santa Monica, CA.
A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-18
... guidance to park management for administration, development, and interpretation of park resources over the... General Management Plan for Harpers Ferry National Historical Park. SUMMARY: Pursuant to the National... availability of a Final Environmental Impact Statement for the General Management Plan for Harpers Ferry [[Page...
MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints
2001-08-01
progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New
A Functional Plan for an Illinois Library Telecommunications Network. The Final Report.
ERIC Educational Resources Information Center
Calabrese, Alice; And Others
This final report describes the plan developed by the Northern Illinois Learning Resources Cooperative, a consortium of 44 community colleges and other academic institutions, which was awarded a Library Services and Construction Act (LSCA) Title III planning grant to research the requirements for a statewide electronic network that would provide…
Mathematic model of regional economy development by the final result of labor resources
NASA Astrophysics Data System (ADS)
Zaitseva, Irina; Malafeev, Oleg; Strekopytov, Sergei; Bondarenko, Galina; Lovyannikov, Denis
2018-04-01
This article presents the mathematic model of regional economy development based on the result of labor resources. The solution of a region development-planning problem is considered for the period of long-lasting planning taking into account the beginning and the end of the planned period. The challenge is to find the distribution of investments in the main and additional branches of the regional economy, which will provide simultaneous transaction of all major sectors of the regional economy from the given condition to the predetermined final state.
15 CFR 990.55 - Restoration selection-developing restoration plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... plan developed with opportunity for public review and comment. To meet this requirement, trustees must, at a minimum, develop a Draft and Final Restoration Plan, with an opportunity for public review of...
15 CFR 990.55 - Restoration selection-developing restoration plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... plan developed with opportunity for public review and comment. To meet this requirement, trustees must, at a minimum, develop a Draft and Final Restoration Plan, with an opportunity for public review of...
Preservation Planning Program. Study Report. Iowa State University Library. Final Report.
ERIC Educational Resources Information Center
Galejs, John; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…
[Final Resolutions Adopted by the Conference on Planning of Rural Areas in Europe, 7 October 1978].
ERIC Educational Resources Information Center
Council of Europe, Strasbourg (France).
Two final resolutions were adopted by the Council of Europe at the October 1978 European Conference of Ministers Responsible for Regional Planning. Resolution 1 focused on guidelines for the planning of rural areas in Europe. Strategies and policies called for: a more balanced development which makes the living conditions of different regions as…
Intelligent Transportation Systems statewide architecture : final report.
DOT National Transportation Integrated Search
2003-06-01
This report describes the development of Kentuckys Statewide Intelligent Transportation Systems (ITS) Architecture. The process began with the development of an ITS Strategic Plan in 1997-2000. A Business Plan, developed in 2000-2001, translated t...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Myers, Greg
This final report document summarizes the activities undertaken and the output from three primary deliverables generated during this project. This fifteen month effort comprised numerous key steps including the creation of an international methane hydrate science team, determining and reporting the current state of marine methane hydrate research, convening an international workshop to collect the ideas needed to write a comprehensive Marine Methane Hydrate Field Research Plan and the development and publication of that plan. The following documents represent the primary deliverables of this project and are discussed in summary level detail in this final report: Historical Methane Hydrate Projectmore » Review Report; Methane Hydrate Workshop Report; Topical Report: Marine Methane Hydrate Field Research Plan; and Final Scientific/Technical Report.« less
Miami Valley ITS : early deployment plan : final user service plan
DOT National Transportation Integrated Search
1997-07-01
This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...
Developing a Career Planning Center. Occupational Education Research Project Final Report.
ERIC Educational Resources Information Center
Kidd, Frank E.; Embry, Judy K.
Designed as a guide for those community college institutions developing a career planning center, this handbook presents a model for planning and implementing such a center. Options for centers are suggested for three levels of development and staffing: self-directed, intermediate, and comprehensive. Chapter 1 outlines the rationale and possible…
Development of an automated pre-sampling plan for construction projects : final report.
DOT National Transportation Integrated Search
1983-03-01
The development of an automated pre-sampling plan was undertaken to free the district construction personnel from the cumbersome and time-consuming task of preparing such plans manually. A computer program was written and linked to a data file which ...
Final report : sampling plan for pavement condition ratings of secondary roads.
DOT National Transportation Integrated Search
1984-01-01
The purpose of this project was to develop a random sampling plan for use in selecting segments of the secondary highway system for evaluation under the Department's PMS. The plan developed is described here. It is a simple, workable, random sampling...
24 CFR 290.15 - Disposition plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...
24 CFR 290.15 - Disposition plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...
24 CFR 290.15 - Disposition plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...
Joint Planning and Development Office Work Plan FY10
2010-01-01
IPSA ) Division will make refinements to the NextGen Portfolio Analysis. In addition, IPSA will work with the Department of Defense (DoD) to define and...Submitted Interagency Portfolio and Systems Analysis ( IPSA ) DRAFT DoD Portfolio Analysis Criteria BASELINE DoD Portfolio Analysis Criteria DRAFT...WG Work Plan Review Prototype Capability Selected and Defined CHAs Complete Safety Metrics for IPSA Complete FINAL Prototype Report FINAL
ERIC Educational Resources Information Center
Green, Stephen; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.
This final report provides a synthesis of conference presentations by representatives from institutions in 17 Latin American and the Caribbean nations. The material includes descriptions about institutions of higher education planning and developing of their respective schools of education, ministries of education, and national and regional…
ERIC Educational Resources Information Center
Gallagher, James Joseph, Ed.
This guide is designed for teachers, administrators, inservice leaders, and teacher educators. Its purpose is to provide an organizational framework, material, and resources for the development of instructional plans and strategies for incorporating regional environmental planning in the secondary school curriculum. The guide is divided into three…
ERIC Educational Resources Information Center
Nebraska State Dept. of Education, Lincoln.
The Nebraska state career education plan was developed to assist individuals in developing essential educational and career skills for responsible functioning. The plan, linking the school and work world, extends chronologically: elementary level--career awareness, middle/junior high school level--career exploration, and senior high school…
Graduate certificate in transportation planning : final report
DOT National Transportation Integrated Search
2008-12-12
The purpose of this project was to develop and implement a graduate Certificate in Transportation Planning at Texas : A&M University. Texas A&M currently offers instruction in transportation through its Masters of Urban Planning and : Civil Engineeri...
What is the Final Verification of Engineering Requirements?
NASA Technical Reports Server (NTRS)
Poole, Eric
2010-01-01
This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-30
... geothermal energy testing and development. The Final EIS also analyzes the potential environmental impacts of... facilitate appropriate development of geothermal, solar, and wind energy in the REEA and make land use plan... Availability of the Final Environmental Impact Statement for the West Chocolate Mountains Renewable Energy...
Code of Federal Regulations, 2013 CFR
2013-10-01
... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...
Code of Federal Regulations, 2014 CFR
2014-10-01
... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...
2013-05-01
Regulation The Proposed Action would not affect local government comprehensive plans. Requires local governments to prepare, adopt, and implement...state-level planning efforts. Requires the development of special statewide plans governing water use, land development, and transportation...cleared area in state waters. However, avoidance of this area would not be significantly burdensome for tourists or recreational users of the Gulf, as
MnDOT Library strategic plan : final report.
DOT National Transportation Integrated Search
2017-06-01
MnDOTs Senior Leadership asked MnDOT Library to develop a Strategic Plan that identifies and reviews the challenges facing the Library over the next five years to better address the evolving needs of the department and users. The strategic plan is...
DOT National Transportation Integrated Search
2007-02-14
This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...
Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals
2000-04-01
formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate
1993-10-01
AD-A274 321 ,’U IflIlllME• U I I DEVELOP A BUSINESS PLAN U FINAL REPORT n A Short Term Research and Development Task Proposed Under DLA900-87-D-0017...DATEU COVERED October 1, 1.993 F inal -10/12./89 Q 6/93 4. TITLE AND SUBTIILE S. FUNDING NUMBERS "Develop a Business Plan" DLA900-87-D-0017 D00017 I...Z39-16 Z9- 107 DEVELOP A BUSINESS PLAN I EXECUTIVE SUMMARY I Funding for CAR’s activities has come from a variety of sources: federal, state, Clemson
76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-17
... power allocation. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing..., Final Power Allocation developed under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program (Program) Final Rule, 10 CFR part 905. These final power...
VTAE Equity Staff Development Workshops and Services--Phase II. Final Report.
ERIC Educational Resources Information Center
Baldus, Lorayne; Nelson, Orville
The Phase II Equity Staff Development project was revised in response to a need to develop an equity strategic planning model with a vision statement, goals, and objectives. The Equity Strategic Planning Model was presented to administrators of Wisconsin Vocational, Technical, and Adult Education (VTAE) colleges for their use in district strategic…
Development and Evaluation of Educational Programs in Electromechanical Technology. Final Report.
ERIC Educational Resources Information Center
Roney, M. W.
The encompassing objective of this project was to assist two-year colleges in establishing electromechanical technican (EMT) training programs by developing the necessary planning and instructional materials and by providing direct program planning assistance. The research effort of the project was to develop and test an integrated systems of…
Tracking the Short Term Planning (STP) Development Process
NASA Technical Reports Server (NTRS)
Price, Melanie; Moore, Alexander
2010-01-01
Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."
ERIC Educational Resources Information Center
Austin, Michael J.; And Others
The Office of Career Planning and Curriculum Development for the Human Services was established in September 1972 to study the problems associated with manpower utilization and the lack of career mobility within the Florida Department of Health and Rehabilitative Services (HRS). Objectives of the study were: (1) to identify the contributing…
Crew Autonomous Scheduling Test (CAST)
2017-07-18
iss052e016190 (July 18, 2017) --- Astronaut Peggy Whitson is photographed sitting in front of the Cupola windows during the final Crew Autonomous Scheduling Test (CAST) session. The CAST investigation analyzes whether crews can develop plans in a reasonable period of time with appropriate input, whether proximity of planners to the planned operations increases efficiency, and if crew members are more satisfied when given a role in plan development.
ERIC Educational Resources Information Center
Illinois Univ., Urbana. Dept. of Vocational and Technical Education.
This report of a project to begin to develop a plan for research, development, and instruction in adult vocational education in Illinois has two specific goals: (1) to identify the current status of adult vocational education in Illinois and (2) to recommend key directions for state actions. It presents information collected through a…
Space Solar Power Program. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arif, Humayun; Barbosa, Hugo; Bardet, Christophe
1992-08-01
Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-18
... will provide guidance to park management for administration, development, and interpretation of park... request, and on the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning.nps.gov... development and future management of the National Historical Park. Alternative A (Continuation of Current...
WORK PLAN FOR COMPLETING A TECHNOLOGY ASSESSMENT OF WESTERN ENERGY RESOURCE DEVELOPMENT
This is a work plan for completing the final phase of a three year technology assessment of the development of six energy resources (coal, geothermal, natural gas, oil, oil shale, and uranium) in eight western states (Arizona, Colorado, Montana, New Mexico, North and South Dakota...
European Perceptions of Plan Colombia: A Virtual Contribution to a Virtual War and Peace Plan?
2001-05-01
government for more effective control of the paramilitary forces may help. A greater surge of European activism backed by development assistance funds and...economic, security, and political spillover effects for neighboring countries. Finally and logically, the author reflects the European concern that...economic, security, and political spillover effects for neighboring countries. Finally and logically, Roy reflects the European concern that whatever
Model Special Education Manpower Information and Management System. Final Report.
ERIC Educational Resources Information Center
Gilles, Cynthia
The Massachusetts Special Education Manpower Planning Project is described. Relying on cooperative planning, the project developed a system to provide information on manpower planning, a system to link other agencies with the project, and annual statements of state special education training priorities. The project also collaborated with six other…
Swimming Pools. A Guide to Their Planning, Design and Operation.
ERIC Educational Resources Information Center
Gabrielsen, M. Alexander, Ed.
Information is presented regarding all phases of swimming pool development and operation from earliest planning considerations to final programing. This comprehensive book covers--(1) the steps involved in planning a pool, (2) designing the pool, (3) water circulation, filtration, and treatment, (4) community pools, school and agency pools, and…
Interagency Planning and Support Project. Final Report.
ERIC Educational Resources Information Center
Salisbury, Christine
This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…
1991-02-01
to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as
Connected Vehicle Impacts on Transportation Planning—Primer and Final Report.
DOT National Transportation Integrated Search
2016-06-01
The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...
Tools for Supporting Distributed Agile Project Planning
NASA Astrophysics Data System (ADS)
Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda
Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.
75 FR 68199 - Fisheries in the Western Pacific; Community Development Program Process
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... 665 [Docket No. 0907211157-0522-04] RIN 0648-AX76 Fisheries in the Western Pacific; Community... Ecosystem Plans for American Samoa, Hawaii, the Mariana Archipelago, and Western Pacific Pelagic Fisheries, relating to the community development plan process. The intent of this final rule is to inform the public...
Military Curriculum Materials for Vocational and Technical Education. Electrician, 3-18.
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. National Center for Research in Vocational Education.
This plan of instruction, lesson plans, workbooks, and study guides for a secondary-postsecondary course for electricians comprise one of a number of military-developed curriculum packages selected for adaptation to vocational instruction and curriculum development in a civilian setting. It contains the final three blocks of a five-block course…
Comprehensive Development Plan in Office Skills. Final Performance Report.
ERIC Educational Resources Information Center
Waubonsee Community Coll., Sugar Grove, IL.
The Waubonsee Community College Comprehensive Development Plan in Office Skills served 208 students by assessment of basic skills and referral to appropriate programs or help with job skills and referral to employment during the 18-month grant period from December 1988 through June 30, 1990. The target population was minority women or economically…
Designing Training Plans for Distributive Education. Final Report.
ERIC Educational Resources Information Center
Syhlman, William D.
These distributive education training and development plans for secondary-level programs provide lists of competencies a student needs to hold a job in sales and marketing occupational areas. The design of the training plans is based on a "pyramid" which incorporates the following five sections or levels of competencies (from general to…
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planningmore » process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.« less
Sub-Project 7 of Wisconsin 553, Part F, EPDA--Industry/Exchange Program: Final Report.
ERIC Educational Resources Information Center
Wisconsin Univ. - Stout, Menomonie. Center for Vocational, Technical and Adult Education.
The final report describes a study to develop a statewide teacher/industry exchange program in Wisconsin that would provide vocational-technical instructors with occupational experience opportunities. Three plans for implementing the program were developed: (A) swapping the positions of a business or industrial person with that of a vocational…
NASA Technical Reports Server (NTRS)
1984-01-01
The design, development and analysis of the 7.3MW MOD-5A wind turbine generator is documented. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 3, book 2 describes the performance and characteristics of the MOD-5A wind turbine generator in its final configuration. The subsystem for power generation, control, and instrumentation subsystems is described in detail. The manufacturing and construction plans, and the preparation of a potential site on Oahu, Hawaii, are documented. The quality assurance and safety plan, and analyses of failure modes and effects, and reliability, availability and maintainability are presented.
Succession planning : determining VDOT's professional needs for the 21st century : final report.
DOT National Transportation Integrated Search
1993-01-01
This report addresses the development of a program of succession planning for the Virginia Department of Transportation (VDOT). Transportation industry findings, confirmed by VDOT demographics, indicate a greater-than- average turnover among senior t...
Metropolitan centers : evaluating local implementation of regional plans and policies : final report
DOT National Transportation Integrated Search
2017-03-01
The Denver and Salt Lake City Metropolitan Planning Organizations (MPOs) have embarked upon regional visioning strategies that promote : development around higher density, mixed use centers with current or future access to transit. This study examine...
ERIC Educational Resources Information Center
Wilson, Blaine R.
This project was conducted to design marketing and distributive education (MDE) student learning objectives and an MDE curriculum development plan. The objectives of this project were met through the following procedures: (1) basic MDE task research was identified; (2) a task force of two MDE teacher coordinators and the project director grouped…
Arizona's Parents Speak Out. Planning for Arizona's Future, Part III.
ERIC Educational Resources Information Center
O'Connell, Joanne C.; And Others
This report is the final in a series designed to assist in the planning and development of a comprehensive, coordinated service delivery system for Arizona infants and toddlers who are developmentally delayed or at risk of developing handicapping conditions, and their families, as outlined in Public Law 99-457. It documents the needs of Arizona's…
40 CFR 63.1960 - How is compliance determined?
Code of Federal Regulations, 2014 CFR
2014-07-01
... have deviated from the requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68...
40 CFR 63.1960 - How is compliance determined?
Code of Federal Regulations, 2012 CFR
2012-07-01
... have deviated from the requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68...
40 CFR 63.1960 - How is compliance determined?
Code of Federal Regulations, 2013 CFR
2013-07-01
... have deviated from the requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68...
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
The Challenges of Planning Language Objectives in Content-Based ESL Instruction
ERIC Educational Resources Information Center
Baecher, Laura; Farnsworth, Tim; Ediger, Anne
2014-01-01
The purpose of this research was to investigate the major patterns in content-based instruction (CBI) lesson plans among practicum teachers at the final stage of an MA TESOL program. One hundred and seven lesson plans were coded according to a typology developed to evaluate clarity and identify areas of potential difficulty in the design of…
ERIC Educational Resources Information Center
Blaschke, Charles L.; Steiger, JoAnn
This report of a project to design a set of training guidelines for planning, managing, and evaluating cooperative education programs describes briefly the procedures used in developing the guidelines and model; discusses the various components of the planning, management, and evaluation process; and presents guidelines and criteria for designing…
ERIC Educational Resources Information Center
Pennsylvania State Univ., University Park. Dept. of Vocational Education.
The report is an accounting of activities of the Vocational Development Study (VDS) project during the three-year funding period of July 1971 to July 1974. The longitudinal study, planned to cover a 10-year span, was begun in the fall of 1968. The project was developed to identify the effects of the high school experience on youth in vocational…
ERIC Educational Resources Information Center
CONNOLLY, JOHN; SMITH, CLODUS R.
THIRTY-NINE FEDERAL AND STATE EDUCATORS FROM 33 STATES, 23 RESOURCE PERSONNEL, AND 15 STAFF AND CHAIRMEN PARTICIPATED IN A SEMINAR TO (1) DEVELOP INSIGHTS INTO THE PRINCIPLES AND PROCESS OF PROGRAM PLANNING, BUDGETING, AND EVALUATION, (2) INVOLVE STATE, REGIONAL, AND LOCAL STAFF MEMBERS, (3) DEVELOP A CADRE OF KNOWLEDGEABLE VOCATIONAL EDUCATORS,…
ERIC Educational Resources Information Center
Sharon, Amiel T.; And Others
The purpose of this study was to obtain information that will make it possible to plan for the development of occupational competency assessment procedures in a rational manner, based on the expressed needs of occupational educators and employers. Eight fields were selected for scrutiny: Accounting, Agribusiness, Data Processing, Day Care,…
Career planning and development for nurses: the time has come.
Donner, G J; Wheeler, M M
2001-06-01
Developments in how the nursing profession is perceived by nurses and by society, along with unparalleled changes in health care systems, have created an environment in which individual nurses must take control of their careers and futures. Educators, employers and professional organizations also have a key role to play in fostering the career planning and development of nurses, usually the largest employee group in most health care organizations. This article provides an overview of what career planning and development is and why it is important for nurses. A career planning and development model is described that provides nurses with a focused strategy to take greater responsibility for engaging in the ongoing planning process that is crucial throughout the major stages of their career. Finally, educators, employers and professional organizations are challenged to collaborate with individual nurses on career-development activities that will enable nurses to continue to provide high-quality care in ever-changing health care systems.
40 CFR 63.1960 - How is compliance determined?
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68 FR 2238, Jan. 16, 2003, as...
40 CFR 63.1960 - How is compliance determined?
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68 FR 2238, Jan. 16, 2003, as...
Cadastre (forest maps) and spatial land uses planning, strategic tool for sustainable development
NASA Astrophysics Data System (ADS)
Drosos, Vasileios C.
2014-08-01
The rise in the living standards of the Greeks created, especially since 1970, along with other needs and the need for second or holiday home since 1990 after finding the first house on the outskirts of large urban centers. Trying to find land for the creation of new resorts or new type of permanent residences (maisonettes with or without garden, depending on the financial position of each) had the painful consequence of wasteful and uncontrolled use of land, without a program, without the fundamental rules of land planning and the final creation was usually unsightly buildings. The costs were to pay as usually the forest rural lands. The national spatial planning of land use requires that we know the existing land uses in this country, and based on that we can design and decide their land uses on the future in a rational way. On final practical level, this planning leads to mark the boundaries of specific areas of land that are permitted and may change uses. For this reason, one of the most valuable "tools" of that final marking the boundaries is also the forest maps. The paper aims the investigation to determine the modern views on the issues of Cadastre and Land Management with an ulterior view to placing the bases for creating a building plan of an immediate completion of forest maps. Sustainable development as a term denoting a policy of continued economic and social development that does not involve the destruction of the environment and natural resources, but rather guarantees their rational viability.
An Asset-Based Approach to Tribal Community Energy Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gutierrez, Rachael A.; Martino, Anthony; Begay, Sandra K.
Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, andmore » political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Manwell, James
2013-03-19
The purpose of the project is to modify and expand the current wind energy curriculum at the University of Massachusetts Amherst and to develop plans to expand the graduate program to a national scale. The expansion plans include the foundational steps to establish the American Academy of Wind Energy (AAWE). The AAWE is intended to be a cooperative organization of wind energy research, development, and deployment institutes and universities across North America, whose mission will be to develop and execute joint RD&D projects and to organize high-level science and education in wind energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swift, Ralph
Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say onmore » either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.« less
Yap, Glenn A; Platonova, Elena A; Musa, Philip F
2006-02-01
An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.
Designing a multiple dependent state sampling plan based on the coefficient of variation.
Yan, Aijun; Liu, Sanyang; Dong, Xiaojuan
2016-01-01
A multiple dependent state (MDS) sampling plan is developed based on the coefficient of variation of the quality characteristic which follows a normal distribution with unknown mean and variance. The optimal plan parameters of the proposed plan are solved by a nonlinear optimization model, which satisfies the given producer's risk and consumer's risk at the same time and minimizes the sample size required for inspection. The advantages of the proposed MDS sampling plan over the existing single sampling plan are discussed. Finally an example is given to illustrate the proposed plan.
76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-31
... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...
The Macomb Plan: Expanding a Community's Access to Higher Education.
ERIC Educational Resources Information Center
Lorenzo, Albert L.
The Macomb Plan, recently developed by Macomb Community College (MCC), is a delivery system for the final two years of a four-year college degree to be housed in a facility located on a two-year college campus. The plan is designed to meet the unique needs of an adult learner's lifestyle, while approximating most of the elements that make up the…
DOT National Transportation Integrated Search
2004-08-01
This report describes the development of a regional Intelligent Transportation Systems (ITS) Architecture for the five-county urban area under the auspices of the Kentuckiana Regional Planning and Development Agency (KIPDA). The architecture developm...
Understanding how climate change will alter the availability of coastal final ecosystem goods and services (FEGS; such as food provisioning from fisheries, property protection, and recreation) has significant implications for coastal planning and the development of adaptive manag...
ERIC Educational Resources Information Center
Dallas Independent School District, TX. Dept. of Research and Evaluation.
This volume consists of a number of appendixes containing data and analyses that were compiled to aid administrators of the Skyline Wide Educational Plan (SWEP) in their efforts to develop a comprehensive secondary school plan for the Dallas-Fort Worth metroplex in the 1970's. Much of the volume is devoted to various facility considerations…
DOT National Transportation Integrated Search
1997-03-01
The goal of this study was to develop a Strategic Plan for deployment of ITS technologies within the Nashville Metro Area and to create a long-term coalition of ITS stakeholders, with the objective of expanding the implementation of ITS technologies ...
DOT National Transportation Integrated Search
2005-12-01
This volume provides an overview of the six studies that compose Phase II of the Enhanced Night Visibility project and the experimental plan for its third and final portion, Phase III. The Phase II studies evaluated up to 12 vision enhancement system...
A long-term plan for evaluating the FHWA's Office of Safety programs : final draft
DOT National Transportation Integrated Search
2006-01-01
The purpose of this report is to develop a generalized plan for evaluating and measuring the effectiveness of the major safety programs of the the FHWA Office of Safety. This report is organized into three sections in order to coincide with the state...
DOT National Transportation Integrated Search
2008-08-01
Report Abstract: : The purpose of this guide is to aid the Texas Department of Transportation (TxDOT), Metropolitan Planning Organizations (MPO), and other state and local agencies to develop an effective traffic monitoring system for new major traff...
Impact of Transportation on the Environment and Quality of Life.
ERIC Educational Resources Information Center
Schuster, James J.
This paper discusses the changing role of civil engineers in developed nations. Transportation facilities generally follow a four phase approach before construction: long range systems planning, corridor location study, design location study, and final preparation of plans. Traditional engineering education emphasized the latter two phases but now…
DOT National Transportation Integrated Search
1994-07-01
A Specific Pavement Studies (SPS) program, formulated under the Strategic Highway Research Program (SHRP), consists of nine experiments, four of which will be included in this DEL-23 project. Since the basic instrumentation plan proposed by SHRP was ...
Pre-Vocational Education Workshop, July 8-19, 1974. Final Report.
ERIC Educational Resources Information Center
Lorenz, James; Putnam, Margaret
The report describes a workshop held to facilitate compliance with recent Tennessee legislation and organized to: (1) plan a model pre-vocational education program at the seventh and eighth grade level and (2) plan for personnel development for teachers, counselors, coordinators, and others responsible for prevocational education programs.…
LDRD project final report : hybrid AI/cognitive tactical behavior framework for LVC.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Djordjevich, Donna D.; Xavier, Patrick Gordon; Brannon, Nathan Gregory
This Lab-Directed Research and Development (LDRD) sought to develop technology that enhances scenario construction speed, entity behavior robustness, and scalability in Live-Virtual-Constructive (LVC) simulation. We investigated issues in both simulation architecture and behavior modeling. We developed path-planning technology that improves the ability to express intent in the planning task while still permitting an efficient search algorithm. An LVC simulation demonstrated how this enables 'one-click' layout of squad tactical paths, as well as dynamic re-planning for simulated squads and for real and simulated mobile robots. We identified human response latencies that can be exploited in parallel/distributed architectures. We did an experimentalmore » study to determine where parallelization would be productive in Umbra-based force-on-force (FOF) simulations. We developed and implemented a data-driven simulation composition approach that solves entity class hierarchy issues and supports assurance of simulation fairness. Finally, we proposed a flexible framework to enable integration of multiple behavior modeling components that model working memory phenomena with different degrees of sophistication.« less
1989-02-01
PLAN A Health and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan...Bicycloheptadiene BCHPD 0(2) Bromoform CHBR3 100(4) note: total trihalomethanes Cadmium CD 10(1) 5(3)* 10(4) I Carbon tetrachloride CCL4 0(3) 5(4) Chlordane CLDAN...comments, numerous carcinogenicity tests in a variety of animals indicate that aldrin and dieldrin promote only liver tumors and the tumors develop only
Trajectory planning and control of a 6 DOF manipulator with Stewart platform-based mechanism
NASA Technical Reports Server (NTRS)
Nguyen, Charles C.; Antrazi, Sami
1990-01-01
The trajectory planning and control was studied of a robot manipulator that has 6 degrees of freedom and was designed based on the mechanism of the Stewart Platform. First the main components of the manipulator is described along with its operation. The solutions are briefly prescribed for the forward and inverse kinematics of the manipulator. After that, two trajectory planning schemes are developed using the manipulator inverse kinematics to track straight lines and circular paths. Finally experiments conducted to study the performance of the developed planning schemes in tracking a straight line and a circle are presented and discussed.
ERIC Educational Resources Information Center
Epler, Doris M.
This project extended two previous projects which were designed to assist teachers in building the necessary skills to plan, develop, and implement competency-based vocational education (CBVE). In addition to released time for instructors, the project provided the funds necessary to form an articulation team effort among Pennsylvania's Reading…
DOT National Transportation Integrated Search
2006-11-01
This is the final report of an 18-month project to: (1) review Next Generation Air Transportation System (NGATS) Joint Planning and Development Office (JPDO) documents as they pertain to human-automation interaction; (2) review past system failures i...
Development of transportation asset management decision support tools : final report.
DOT National Transportation Integrated Search
2017-08-09
This study developed a web-based prototype decision support platform to demonstrate the benefits of transportation asset management in monitoring asset performance, supporting asset funding decisions, planning budget tradeoffs, and optimizing resourc...
Louisiana DOTD maintenance budget allocation system: final report.
DOT National Transportation Integrated Search
2002-11-01
This project developed a computer system to assist Louisiana Department of Transportation and Development (LA DOTD) maintenance managers in the preparation of zero-based, needs-driven annual budget plans for routine maintenance. This includes pavemen...
Corrugated steel culvert pipe deterioration : final report, August 2009.
DOT National Transportation Integrated Search
2009-08-01
This research provides the basis for developing a comprehensive plan for inspection, cleaning, condition assessment and : prediction of remaining service life of CSCP (Corrugated Steel Culvert Pipe). Inspection frequency guidelines were developed : t...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1976-07-01
A development and cost plan is proposed for the UTEX (Ultraviolet Telescope Experiment X-ray) telescope. Under certain assumptions, the UTEX facility can be developed in about 4 years. An overall development cost is given.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-16
...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
On-Line Planning and Mapping for Chemical Plume Tracing
2004-06-01
09 - 2005 Final Report 01/04/2001 - 31/10/2004 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER On-line Planning and Mapping for Chemical Plume Tracing 5b...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Department of Electrical Engineering University of California...develop, and implement on-vehicle planning and mapping theory and software to find, trace, and map chemical plumes. This objective included accurate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williamson, Jim S; Greenwood Village, CO 80112
2007-03-31
Strategic Planning and Energy Options Analysis provides the Fort Peck Tribes with a tool to build analytical capabilities and local capacity to extract the natural and energy resource potential for the benefit of the tribal community. Each resource is identified irrespective of the development potential and is viewed as an absolute resulting in a comprehensive resource assessment for Tribal energy planning
Navy Medicine. Volume 101, No. 1, January-February 2010
2010-02-01
Bookatz painted in their midst, Roosevelt and his advisors made the de - cisions and planned the grand strategy for final victory over the Axis...promoting democratic development and prosper- ity. The humanitarian aid mission is considered key to USSOUTHCOM’s Strategic Communications Plan , and...NAVSO/4th Fleet) are the main planning and coordination ele- ments for Continuing Promise. Capt. Miguel A. Cubano, MC, Command Surgeon
Expert systems in transmission planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Galiana, F.D.; McGillis, D.T.; Marin, M.A.
1992-05-01
In this paper the state of the field of expert systems and knowledge engineering in transmission planning is reviewed. A detailed analysis of the goals, definition, requirements and methodology of transmission planning is presented. Potential benefits of knowledge-based applications in transmission planning are reviewed. This is followed by a thorough review of the area broken down into subareas or important related topics. The conclusions offer a number of suggestions for possible future research and development. Finally, a detailed bibliography divided into subareas is presented.
ERIC Educational Resources Information Center
Lipka, Jerry; Willer, Cristy
Written with the broad goal of involving high school students in Bristol Bay, Alaska, in the planning and design of their region's future, this combined teacher guide and student text contains the final three units of a seven-unit curriculum. Unit V looks at oil development in the Bering Sea, covering topics such as Alaska's dependence on oil,…
Development of State Plan for Career Education in Alabama. Final Report.
ERIC Educational Resources Information Center
Alabama State Dept. of Education, Montgomery.
This state plan for career education in Alabama describes the first-year objectives and operational procedures of the State Advisory Council for Career Education. Activities of the following six task forces are reported: (1) needs assessment for grades K-12, (2) postsecondary needs assessment, (3) noneducational (business and industry) needs…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-15
... complete the removal of all invasive animal species. We will also develop and implement a plan for..., if necessary, efforts to remove invasive species. The number of vegetation plots and frequency of... safety of the refuge regarding the removal of unexploded ordnance. CCP Alternatives, Including Our...
ERIC Educational Resources Information Center
Vivian, Neal E.
To upgrade research and research utilization competence of vocational educators, The Center for Vocational and Technical Education and The American Vocational Association planned four 1-week research training programs on: (1) Planning Vocational/Technical Education Programs Based on Manpower Research, (2) Patterns of Career Development as Applied…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
... Genesis Solar Energy Project and Proposed California Desert Conservation Area Plan Amendment AGENCY... Solar LLC's Genesis Solar Energy Project (GSEP) and by this notice is announcing its availability. DATES... amendment the CDCA Plan to make the area suitable for solar energy development; a reduced acreage...
7 CFR 3575.90 - Disposition of acquired property.
Code of Federal Regulations, 2010 CFR
2010-01-01
... collateral must be maintained. (d) Collateral sale. (1) The lender will prepare and submit to the Agency a plan on the best method of sale, keeping in mind any prospective purchasers. The Agency must approve... paid until final disposition, the lender must proceed as quickly as possible to develop a plan to fully...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-10-01
This document supersedes the previous one, taking into account changes that have taken place in the CFS Science and Technology (S and T) program structure and organization, and in the structure of the Program of Energy Research and Development, the source of funding for CFS bioenergy research. It explains the rationale and overall objective for the bioenergy research program and briefly reviews the accomplishments to date. It indicates the planning context within which the program operates, states the specific objectives for the period of the plan, and details the strategic priorities developed for this period. Finally, it outlines the implementationmore » process for the plan.« less
EPA Communications Stylebook: Basic Checklist for Product Development
Determine your top messages, check if a similar EPA product already exists, identify your target audience, develop a distribution plan, estimate cost, submit for PROTRAC review, use the Stylebook, get a publication number, final review, publish.
O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis
2011-03-01
Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.
ERIC Educational Resources Information Center
Marshall Univ., Huntington, WV. Dept. of Occupational, Adult, and Safety Education.
A core curriculum, training plans, and implementation guide developed by the project are included in this final report, which describes activities to resolve problems encountered by teachers using the IDECC (Interstate Distributive Education Curriculum Consortium) system designed for distributive education (DE) and diversified cooperative training…
Professional Development and TransLink[R]. Final Report.
ERIC Educational Resources Information Center
Kuhn, Beverly T.; Jasek, Deborah
This report covers one segment of a larger professional development program for transportation professionals that addresses the need to develop a larger cadre of transportation professionals capable of designing, planning, managing, operating, and maintaining the transportation infrastructure nationwide. Three specific tasks were undertaken and…
The Philippine Parliamentarians Conference on Human Survival, Population and Development. Summary.
1988-12-01
Proceedings of the 1st Philippine Parliamentarians' Conference on Human Survival, Population and Development (PARLCON '88) are summarized in this report. Conference participants included the House and Senate, government officials, representatives of nongovernmental organizations, international organizations, the diplomatic corps and the media. A message from the President was read, referring the "silent emergency" of malnutrition and infant mortality of over 100,000 yearly. The events taking place were a statement of objectives, a Senate Resolution welcoming the convening of the conference, an opening ceremony, a posthumous award to R. M. Sales, executive director of the UNFPA, and a final a plan of action. Much of the content of the above events was duplicated in the final plan, which was formulated in 17 points. Some of these key points were: recognition of the need for quality of life, the detrimental effect of rapid population growth on development, the right of spouses to plan family size within their ethical beliefs, and the need for political will to address development concerns. The conference recommended that parliament and local governments strive for a consensus on national policy regarding population; ensure that economic gains are not decimated by population growth, protect the environment, develop social and industrial infrastructure in outlying areas, pursue national self-reliance, promote the human right of choosing desired family size, endorse the small family norm, empower women by educational and income generating opportunities, gather national data on population, strengthen the Population Commission, support nongovernmental agencies that provide family planning services, and promote education on family planning.
Manual for research, development and technology program and project evaluations : final report.
DOT National Transportation Integrated Search
2016-04-01
This manual provides the Federal Railroad Administrations (FRA) Office of Research, Development and Technology (RD&T) a : framework, standards, and procedures for planning, conducting, reporting, and using sound evaluations of RD&Ts projects fo...
Brownfields Samoa Peninsula Project: Phase I Sustainable Site Analysis Final Report
This report provides an analysis and scoring using the Leadership in Energy and Environmental Design, Neighborhood Development Rating System, and the Land and Natural Development Code in order to assess the proposed redevelopment a master plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Nan; Carmona, Ruben; Sirak, Igor
Purpose: To demonstrate an efficient method for training and validation of a knowledge-based planning (KBP) system as a radiation therapy clinical trial plan quality-control system. Methods and Materials: We analyzed 86 patients with stage IB through IVA cervical cancer treated with intensity modulated radiation therapy at 2 institutions according to the standards of the INTERTECC (International Evaluation of Radiotherapy Technology Effectiveness in Cervical Cancer, National Clinical Trials Network identifier: 01554397) protocol. The protocol used a planning target volume and 2 primary organs at risk: pelvic bone marrow (PBM) and bowel. Secondary organs at risk were rectum and bladder. Initial unfiltered dose-volumemore » histogram (DVH) estimation models were trained using all 86 plans. Refined training sets were created by removing sub-optimal plans from the unfiltered sample, and DVH estimation models… and DVH estimation models were constructed by identifying 30 of 86 plans emphasizing PBM sparing (comparing protocol-specified dosimetric cutpoints V{sub 10} (percentage volume of PBM receiving at least 10 Gy dose) and V{sub 20} (percentage volume of PBM receiving at least 20 Gy dose) with unfiltered predictions) and another 30 of 86 plans emphasizing bowel sparing (comparing V{sub 40} (absolute volume of bowel receiving at least 40 Gy dose) and V{sub 45} (absolute volume of bowel receiving at least 45 Gy dose), 9 in common with the PBM set). To obtain deliverable KBP plans, refined models must inform patient-specific optimization objectives and/or priorities (an auto-planning “routine”). Four candidate routines emphasizing different tradeoffs were composed, and a script was developed to automatically re-plan multiple patients with each routine. After selection of the routine that best met protocol objectives in the 51-patient training sample (KBP{sub FINAL}), protocol-specific DVH metrics and normal tissue complication probability were compared for original versus KBP{sub FINAL} plans across the 35-patient validation set. Paired t tests were used to test differences between planning sets. Results: KBP{sub FINAL} plans outperformed manual planning across the validation set in all protocol-specific DVH cutpoints. The mean normal tissue complication probability for gastrointestinal toxicity was lower for KBP{sub FINAL} versus validation-set plans (48.7% vs 53.8%, P<.001). Similarly, the estimated mean white blood cell count nadir was higher (2.77 vs 2.49 k/mL, P<.001) with KBP{sub FINAL} plans, indicating lowered probability of hematologic toxicity. Conclusions: This work demonstrates that a KBP system can be efficiently trained and refined for use in radiation therapy clinical trials with minimal effort. This patient-specific plan quality control resulted in improvements on protocol-specific dosimetric endpoints.« less
NASA Technical Reports Server (NTRS)
1991-01-01
This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.
NASA Technical Reports Server (NTRS)
1991-01-01
The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.
NASA Technical Reports Server (NTRS)
1991-01-01
The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.
NASA Technical Reports Server (NTRS)
1991-01-01
This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-02
... Decision for the General Management Plan/Abbreviated Final Environmental Impact Statement for New River... Abbreviated Final Environmental Impact Statement for the General Management Plan for New River Gorge National... Record of Decision can be downloaded from the NPS Planning, Environment and Public Comment (PEPC) Web...
Phase IV of Early Restoration | NOAA Gulf Spill Restoration
Trustees published the Final Phase IV Early Restoration Plan and Environmental Assessments. The plan habitats. Useful Links: Final Phase IV Early Restoration Plan and Environmental Assessments (pdf, 4.8 MB ) Final Phase IV Early Restoration Plan and Environmental Assessments Executive Summary (pdf, 729 KB
Implementation of a Web-Based Collaborative Process Planning System
NASA Astrophysics Data System (ADS)
Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi
Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.
Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.
2000-03-23
This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.
The Center for In-Service Education. Final Evaluation Report. Volume I. Part 1.
ERIC Educational Resources Information Center
Tennessee State Dept. of Education, Nashville.
The primary objectives of the Center for In-Service Education in implementing a model for in-service education were to a) implement and demonstrate the comprehensive in-service model developed during the planning phase, b) provide coordinated planning of in-service education for all participating school systems, c) directly assist regional…
ERIC Educational Resources Information Center
Stella, Carolyn Rose
Curriculum materials are provided for 15 vocational programs. Each course is divided into units, for which a lesson plan is provided. The lesson plans vary slightly by course but generally contain these components: unit title, goal and/or objective, content outline, rationale, procedures, a list of required materials, recommended form of…
ERIC Educational Resources Information Center
Noll, Gayle
In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-17
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N175; 61130-1115-0000 F2] Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and Final... Department of Natural Resources and Conservation (DNRC) a Final Habitat Conservation Plan (HCP) and prepared...
Efficiency improvements of offline metrology job creation
NASA Astrophysics Data System (ADS)
Zuniga, Victor J.; Carlson, Alan; Podlesny, John C.; Knutrud, Paul C.
1999-06-01
Progress of the first lot of a new design through the production line is watched very closely. All performance metrics, cycle-time, in-line measurement results and final electrical performance are critical. Rapid movement of this lot through the line has serious time-to-market implications. Having this material waiting at a metrology operation for an engineer to create a measurement job plan wastes valuable turnaround time. Further, efficient use of a metrology system is compromised by the time required to create and maintain these measurement job plans. Thus, having a method to develop metrology job plans prior to the actual running of the material through the manufacture area can significantly improve both cycle time and overall equipment efficiency. Motorola and Schlumberger have worked together to develop and test such a system. The Remote Job Generator (RJG) created job plans for new device sin a manufacturing process from an NT host or workstation, offline. This increases available system tim effort making production measurements, decreases turnaround time on job plan creation and editing, and improves consistency across job plans. Most importantly this allows job plans for new devices to be available before the first wafers of the device arrive at the tool for measurement. The software also includes a database manager which allows updates of existing job plans to incorporate measurement changes required by process changes or measurement optimization. This paper will review the result of productivity enhancements through the increased metrology utilization and decreased cycle time associated with the use of RJG. Finally, improvements in process control through better control of Job Plans across different devices and layers will be discussed.
Challenges and Opportunities for an ITS Intermodal Freight Program
DOT National Transportation Integrated Search
1999-02-01
This final report was developed as part of the project, "ITS/Intermodal Freight Design for Operational Tests." The objective of the project was to develop a plan for conducting field operational tests to facilitate movement of intermodal freight in t...
Challenges And Opportunities For An ITS/Intermodal Freight Program
DOT National Transportation Integrated Search
1999-02-01
This final report was developed as part of the project, "ITS/Intermodal Freight Design for Operational Tests". The objective of the project was to develop a plan for conducting field operational tests to facilitate movement of intermodal freight in t...
Automated planning for intelligent machines in energy-related applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; de Saussure, G.; Barhen, J.
1984-01-01
This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.
Analysis on influencing factors of EV charging station planning based on AHP
NASA Astrophysics Data System (ADS)
Yan, F.; Ma, X. F.
2016-08-01
As a new means of transport, electric vehicle (EV) is of great significance to alleviate the energy crisis. EV charging station planning has a far-reaching significance for the development of EV industry. This paper analyzes the impact factors of EV charging station planning, and then uses the analytic hierarchy process (AHP) to carry on the further analysis to the influencing factors, finally it gets the weight of each influence factor, and provides the basis for the evaluation scheme of the planning of charging stations for EV.
The development and validation of the advance care planning questionnaire in Malaysia.
Lai, Pauline Siew Mei; Mohd Mudri, Salinah; Chinna, Karuthan; Othman, Sajaratulnisah
2016-10-18
Advance care planning is a voluntary process whereby individual preferences, values and beliefs are used to aid a person in planning for end-of-life care. Currently, there is no local instrument to assess an individual's awareness and attitude towards advance care planning. This study aimed to develop an Advance Care Planning Questionnaire and to determine its validity and reliability among older people in Malaysia. The Advance Care Planning Questionnaire was developed based on literature review. Face and content validity was verified by an expert panel, and piloted among 15 participants. Our study was conducted from October 2013 to February 2014, at an urban primary care clinic in Malaysia. Included were those aged >50 years, who could understand English. A retest was conducted 2 weeks after the first administration. Participants from the pilot study did not encounter any problems in answering the Advance Care Planning Questionnaire. Hence, no further modifications were made. Flesch reading ease was 71. The final version of the Advance Care Planning Questionnaire consists of 66 items: 30 items were measured on a nominal scale, whilst 36 items were measured on a Likert-like scale; of which we were only able to validate 22 items, as the remaining 14 items were descriptive in nature. A total of 245 eligible participants were approached; of which 230 agreed to participate (response rate = 93.9 %). Factor analysis on the 22 items measured on a Likert-scale revealed four domains: "feelings regarding advance care planning", "justifications for advance care planning", "justifications for not having advance care planning: fate and religion", and "justifications for not having advance care planning: avoid thinking about death". The Cronbach's alpha values for items each domain ranged from 0.637-0.915. In test-retest, kappa values ranged from 0.738-0.947. The final Advance Care Planning Questionnaire consisted of 63 items and 4 domains. It was found to be a valid and reliable instrument to assess the awareness and attitude of older people in Malaysia towards advance care planning.
2009-01-01
must be considered for each threat. The Department of Homeland Security (DHS) has defined 15 National Planning Scenarios ( NPSs ), along with a...considered how to incorporate the 15 NPSs and the Target Capabilities List developed by DHS. Finally, we considered the work being done by Dr. Charles...suite of models and other tools hampers effective planning and re- sponse for all hazards, including the NPSs . The ES community has many meth- ods
Final Report for X-ray Diffraction Sample Preparation Method Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ely, T. M.; Meznarich, H. K.; Valero, T.
WRPS-1500790, “X-ray Diffraction Saltcake Sample Preparation Method Development Plan/Procedure,” was originally prepared with the intent of improving the specimen preparation methodology used to generate saltcake specimens suitable for XRD-based solid phase characterization. At the time that this test plan document was originally developed, packed powder in cavity supports with collodion binder was the established XRD specimen preparation method. An alternate specimen preparation method less vulnerable, if not completely invulnerable to preferred orientation effects, was desired as a replacement for the method.
DOE Office of Scientific and Technical Information (OSTI.GOV)
EISLER, G. RICHARD
This report summarizes the analytical and experimental efforts for the Laboratory Directed Research and Development (LDRD) project entitled ''Robust Planning for Autonomous Navigation of Mobile Robots In Unstructured, Dynamic Environments (AutoNav)''. The project goal was to develop an algorithmic-driven, multi-spectral approach to point-to-point navigation characterized by: segmented on-board trajectory planning, self-contained operation without human support for mission duration, and the development of appropriate sensors and algorithms to navigate unattended. The project was partially successful in achieving gains in sensing, path planning, navigation, and guidance. One of three experimental platforms, the Minimalist Autonomous Testbed, used a repetitive sense-and-re-plan combination to demonstratemore » the majority of elements necessary for autonomous navigation. However, a critical goal for overall success in arbitrary terrain, that of developing a sensor that is able to distinguish true obstacles that need to be avoided as a function of vehicle scale, still needs substantial research to bring to fruition.« less
ERIC Educational Resources Information Center
Vinton, Dennis A.; Zachmeyer, Richard F.
This final report presents a description of a 3-year project to develop and implement a model training program (for special education personnel, park and resource management personnel, and parents of disabled children) designed to promote outdoor environmental education for disabled children. The project conducted 22 training workshops (2-5 days)…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1983-12-30
The purpose of this study and report is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP). This report will: Develop a systematic plan of energy conservation opportunities (ECO`s) that will meet the objectives of the AFEP. Develop a coordinated facility-wide energy study. Prepare DD Form 1391 and Project Development Brochure (PDB`s) and required documentation for feasible projects. Include all practical energy conservation methods and determine economic feasibility in accordance with given guidelines. List and prioritize recommended projects.
1993-04-01
separation capability. o Demonstrate advanced KKVs in the 6-20 KG weight class. o Test planning for SRAM/LEAP and PATRIOT/LEAP integrated technology...packaging techniques to reduce satellite size, weight , power, and total system costs. Further development of these technologies are absolutely 4...1993 o Developed a master plan with a delivery schedule for each light- weight subassembly in the sensor integration payload. o Finalized a contract for
DOT National Transportation Integrated Search
2014-04-01
The Commercial Skills Test Information Management System (CSTIMS) was developed to address the fraudulent issuance of commercial drivers licenses (CDLs) across the United States. CSTIMS was developed as a Web-based, software-as-a-service system to...
East-West transport corridor feasibility study : phase 1, vol. 2 : development plans : final report
DOT National Transportation Integrated Search
1998-04-01
This study, conducted by Bechtel International, was funded by the U.S. Trade and Development Agency. The member countries of the South Balkan Initiative Program (Albania, Macedonia, and Bulgaria) are seeking to improve their transportation infrastruc...
Code of Federal Regulations, 2014 CFR
2014-07-01
... preliminary or final plans, the Corporation shall explore the tenanting opportunities proposed by the... that the Developer make every effort to lease space to Persons on the List and to report to the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... preliminary or final plans, the Corporation shall explore the tenanting opportunities proposed by the... that the Developer make every effort to lease space to Persons on the List and to report to the...
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Chen, Xiaojun; Cheng, Jun; Gu, Xin; Sun, Yi; Politis, Constantinus
2016-04-01
Preoperative planning is of great importance for transforaminal endoscopic techniques applied in percutaneous endoscopic lumbar discectomy. In this study, a modular preoperative planning software for transforaminal endoscopic surgery was developed and demonstrated. The path searching method is based on collision detection, and the oriented bounding box was constructed for the anatomical models. Then, image reformatting algorithms were developed for multiplanar reconstruction which provides detailed anatomical information surrounding the virtual planned path. Finally, multithread technique was implemented to realize the steady-state condition of the software. A preoperative planning software for transforaminal endoscopic surgery (TE-Guider) was developed; seven cases of patients with symptomatic lumbar disc herniations were planned preoperatively using TE-Guider. The distances to the midlines and the direction of the optimal paths were exported, and each result was in line with the empirical value. TE-Guider provides an efficient and cost-effective way to search the ideal path and entry point for the puncture. However, more clinical cases will be conducted to demonstrate its feasibility and reliability.
Quinault Indian Nation Renewable Energy Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Don Hopps, Institute for Washington's Future; Jesse Nelson, Institute for Washington's Future
2006-11-28
The Quinault Indian Nation (Nation) initiated this study on conservation and production of renewable energy because this approach created the opportunity: • To become self-sufficient and gain greater control over the energy the Nation uses; • To generate jobs and businesses for its members; • To better manage, sustain, and protect its resources; • To express the cultural values of the Nation in an important new arena. The Nation has relatively small energy needs. These needs are concentrated at two separate points: the Quinault Beach Resort and Casino (QBRC) and Taholah on the Quinault Indian Reservation (QIR). Except for themore » town of Queets, energy needs are small and scattered. The needs vary greatly over the season. The small scale, widely dispersed, and variable nature of these needs presents a unique challenge to the Nation. Meeting these needs requires a resource and technology that is flexible, effective, and portable. Conservation is the most cost-effective way to meet any need. It is especially effective in a situation like this where production would leave a high per unit cost. This plan is based on first gaining energy savings through conservation. Major savings are possible through: 1. Upgrading home appliances on the QIR. 2. Weatherizing homes and facilities. 3. Changes in lighting/ventilation in the QBRC pool room. These elements of the plan are already being implemented and promise to save the Nation around a quarter of its present costs. Wood biomass is the best resource available to the QIN for energy production either on-site or for commercial development. It is abundant, flexible and portable. Its harvesting has high job potential and these jobs are a good fit for the present “skill set” of the QIN. This plan focuses on using wood biomass to produce energy and other value-added products. Our study considered various technologies and approaches to using wood for energy. We considered production for both on-site and commercial production. This plan calls for commercial-scale production only, with the QIN being the first “customer” for the product. This plan favors employing the pyrolysis technology to produce bio-oil, heat, and char. We favor this approach and technology because it is the most cost effective way to use the available resource. Its main product, bio-oil, has proven utility for the production of heat and electricity. It has promise for use as an alternative fuel, which is a much higher value than present uses of wood and it meets the QIN need for flexibility, scalability, and portability. Char, the secondary product from the pyrolysis process, has proven value-added uses. In addition to these direct benefits, the use of biomass in pyrolysis technology has significant indirect benefits. These benefits include the fact that the technology is a good fit with the Nation’s cultural values, i.e., environmental protection and the holistic use of a resource. It fits well with current QIN enterprises. For example, char could be processed into a charcoal co-product for QIN fish. Finally, the QIN can become a leader in developing and demonstrating this innovative approach to the use of wood. This plan proposes key organization steps to insure both excellent implementation of the plan and taking the best advantage of the processes and facilities put in place. This plan calls for two new QIN organizations: an energy production/distribution corporation and a community development corporation. The production/distribution corporation can be either a utility or a business enterprise that develops and markets renewable energy. The community development corporation can be a not-for-profit to support the QIN in taking best advantage of its energy opportunities. The production and distribution corporation is the subject of a further business planning effort now underway. This plan envisions a community development corporation that works directly with the Business Committee on research, education, and project development. Specifically, this corporation can seek grant funding to research energy matters such as the BPA direct sale of energy proposal, identify key business opportunities like charcoal production and train QIN members in business building, and establish a renewable energy education program and center to enhance the education of QIN youth and market to schools and community colleges in Western Washington. Overall, this final report includes the final Renewable Energy Plan for the QIN, the final Financial Analysis, and appendices. The two final plans are the culmination of research and planning represented by the appendices.« less
National Longitudinal Study Planning Conference, October 1-3, 1975. Final Paper from the Panel.
ERIC Educational Resources Information Center
Howard, Walter R.
This planning conference was one in a series of such conferences aimed at providing continuous guidance for the development of the National Longitudinal Study of the High School Class of 1972 (NLS) a study designed to discover what happens to young adults after they leave high school, and to relate this information to earlier educational…
The value of information in conservation planning: Selecting retention trees for lichen conservation
Karin Perhans; Robert G. Haight; Lena Gustafsson
2014-01-01
Conservation planning studies at small scales such as forest stands and below are uncommon. However, for retention forestry, developed during the last two decades and with current wide and increasing application in boreal and temperate regions, the need for cost-effective selection of individual trees is evident. In retention forestry certain trees are left at final...
1998-01-01
Biological (CB) Protective Duty Uniform (STO) • Biometrics (SRO) • Nanoscience (SRO) • Millimeter Wave Material and Dissemination Technology... Biometrics and Nanoscience SROs will enable the development of advanced NBC detection and characterization systems, including the exploitation of biologically...Requirements Trailers • Procure HEMAT Trailers Figure K-23 K-19 //;<?. U.S. Army 1997Modernization Plan This final fleet assessment, made against the
2004-12-31
Research, 58( 1 ), 47-77. Herl, H. E., O’Neil, H. F ., Jr., Chung, G., & Schacter, J. (1999) Reliability and validity of a computer-based knowledge mapping...simulation: A meta analysis. International Journal of Instructional Media, 26( 1 ), 71-85. Leemkuil, H., de Jong, T., de Hoog , R., & Christoph, N. (2003...FINAL REPORT ON PLAN FOR THE ASSESSMENT AND EVALUATION OF INDIVIDUAL AND TEAM PROFICIENCIES DEVELOPED BY THE DARWARS ENVIRONMENTS Harold F . O’Neil
Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth
2018-01-01
The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544
Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, C.; Lightman, A.
This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.
2005-05-31
building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...
Code of Federal Regulations, 2013 CFR
2013-07-01
... preliminary or final plans, the Corporation shall explore the tenanting opportunities proposed by the... that the Developer make every effort to lease space to Persons on the List and to report to the...
Strategic planning--a plan for excellence for South Haven Health System.
Urbanski, Joanne; Baskel, Maureen; Martelli, Mary
2011-01-01
South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.
The evolutionary origin of the vertebrate body plan: the problem of head segmentation.
Onai, Takayuki; Irie, Naoki; Kuratani, Shigeru
2014-01-01
The basic body plan of vertebrates, as typified by the complex head structure, evolved from the last common ancestor approximately 530 Mya. In this review, we present a brief overview of historical discussions to disentangle the various concepts and arguments regarding the evolutionary development of the vertebrate body plan. We then explain the historical transition of the arguments about the vertebrate body plan from merely epistemological comparative morphology to comparative embryology as a scientific treatment on this topic. Finally, we review the current progress of molecular evidence regarding the basic vertebrate body plan, focusing on the link between the basic vertebrate body plan and the evolutionarily conserved developmental stages (phylotypic stages).
Final Work Plan: Targeted Investigation at York, Nebraska
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less
Core competency model for the family planning public health nurse.
Hewitt, Caroline M; Roye, Carol; Gebbie, Kristine M
2014-01-01
A core competency model for family planning public health nurses has been developed, using a three stage Delphi Method with an expert panel of 40 family planning senior administrators, community/public health nursing faculty and seasoned family planning public health nurses. The initial survey was developed from the 2011 Title X Family Planning program priorities. The 32-item survey was distributed electronically via SurveyMonkey(®). Panelist attrition was low, and participation robust resulting in the final 28-item model, suggesting that the Delphi Method was a successful technique through which to achieve consensus. Competencies with at least 75% consensus were included in the model and those competencies were primarily related to education/counseling and administration of medications and contraceptives. The competencies identified have implications for education/training, certification and workplace performance. © 2014 Wiley Periodicals, Inc.
Teaching and Learning for the Future. Committee on Multimedia in Teacher Training, Final Report.
ERIC Educational Resources Information Center
Plomp, Tjeerd, Ed.; And Others
This is the final report of the Committee on MultiMedia in Teacher Training (COMMITT), which offers a strategic framework to support efforts of teacher training institutes in the Netherlands to develop their own plans for enhancing the teaching and learning process as well as its outcomes through the application of Information and Communication…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).
Final report : UAB transportation workforce development.
DOT National Transportation Integrated Search
2014-06-01
Transportation engineering supports safe and efficient movement of people and goods through : planning, design, operation and management of transportation systems. As needs for : transportation continue to grow, the future needs for qualified transpo...
A Markovian model for assessment of personnel hiring plans
NASA Technical Reports Server (NTRS)
Katz, L. G.
1974-01-01
As a result of the current economic environment, many organizations are having to operate with fewer resources. In the manpower area, these constraints have forced organizations to operate within well-defined hiring plans. Exceeding personnel ceilings is in most cases an intolerable situation. A mathematical model, based on the theory of Markov processes, is presented which can be used to assess the chances of success of personnel hiring plans. The model considers a plan to be successful if the final population size, at the end of the planning period, lies within a range specified by management. Although this model was developed to assess personnel hiring plans at the Goddard Space Flight Center, it is directly applicable wherever personnel hiring plans are used.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-18
... DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the... Interior. ACTION: Notice of Availability of the Final Environmental Impact Statement for the General... Environmental Impact Statement for the General Management Plan for Monocacy National Battlefield. The plan will...
Constraint-based integration of planning and scheduling for space-based observatory management
NASA Technical Reports Server (NTRS)
Muscettola, Nicola; Smith, Steven F.
1994-01-01
Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.
Achievement Motivation Development Project. Final Report. Appendix IV, Part 2.
ERIC Educational Resources Information Center
McClelland, David C.; Alschuler, Alfred S.
The Achievement Motivation Development Project is described. The Project has culminated in the development of course materials designed explicitly to promote aspects of psychological growth. As such, it is viewed as but one thrust in an emerging psychological education movement. Achievement motivation is defined as a way of planning, a set of…
ERIC Educational Resources Information Center
Hull, Daniel M.; Lovett, James E.
The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5408-N-03] Notice of Availability of... of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice. SUMMARY: The Department of Housing and Urban Development (HUD) gives notice to the public, agencies, and Indian Tribes...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-29
... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-21
...-FF03E00000] Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of... Springfield Plateau Regional Restoration Plan (Plan) and Environmental Assessment and Finding of No... Springfield Plateau Regional Restoration Plan and Environmental Assessment (77 FR 1717). The public comment...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, Z; Kennedy, A; Larsen, E
2015-06-15
Purpose: The study aims to develop and validate a knowledge based planning (KBP) model for external beam radiation therapy of locally advanced non-small cell lung cancer (LA-NSCLC). Methods: RapidPlan™ technology was used to develop a lung KBP model. Plans from 65 patients with LA-NSCLC were used to train the model. 25 patients were treated with VMAT, and the other patients were treated with IMRT. Organs-at-risk (OARs) included right lung, left lung, heart, esophagus, and spinal cord. DVH and geometric distribution DVH were extracted from the treated plans. The model was trained using principal component analysis and step-wise multiple regression. Boxmore » plot and regression plot tools were used to identify geometric outliers and dosimetry outliers and help fine-tune the model. The validation was performed by (a) comparing predicted DVH boundaries to actual DVHs of 63 patients and (b) using an independent set of treatment planning data. Results: 63 out of 65 plans were included in the final KBP model with PTV volume ranging from 102.5cc to 1450.2cc. Total treatment dose prescription varied from 50Gy to 70Gy based on institutional guidelines. One patient was excluded due to geometric outlier where 2.18cc of spinal cord was included in PTV. The other patient was excluded due to dosimetric outlier where the dose sparing to spinal cord was heavily enforced in the clinical plan. Target volume, OAR volume, OAR overlap volume percentage to target, and OAR out-of-field volume were included in the trained model. Lungs and heart had two principal component scores of GEDVH, whereas spinal cord and esophagus had three in the final model. Predicted DVH band (mean ±1 standard deviation) represented 66.2±3.6% of all DVHs. Conclusion: A KBP model was developed and validated for radiotherapy of LA-NSCLC in a commercial treatment planning system. The clinical implementation may improve the consistency of IMRT/VMAT planning.« less
Preliminary design polymeric materials experiment. [for space shuttles and Spacelab missions
NASA Technical Reports Server (NTRS)
Mattingly, S. G.; Rude, E. T.; Marshner, R. L.
1975-01-01
A typical Advanced Technology Laboratory mission flight plan was developed and used as a guideline for the identification of a number of experiment considerations. The experiment logistics beginning with sample preparation and ending with sample analysis are then overlaid on the mission in order to have a complete picture of the design requirements. The results of this preliminary design study fall into two categories. First specific preliminary designs of experiment hardware which is adaptable to a variety of mission requirements. Second, identification of those mission considerations which affect hardware design and will require further definition prior to final design. Finally, a program plan is presented which will provide the necessary experiment hardware in a realistic time period to match the planned shuttle flights. A bibliography of all material reviewed and consulted but not specifically referenced is provided.
Final Report: Former Chesapeake Supply Brownfield Revitalization: Rapid Health Impact Assessment
documents the HIA analyses, findings, and recommendations for the City of Dover to consider health in decisions around its revitalization plans and outlines opportunities for further development and future assessments.
Final Report: Former Chesapeake Supply Brownfield Revitalization: Rpaid Health Impact Assessment
documents the HIA analyses, findings, and recommendations for the City of Dover to consider health in decisions around its revitalization plans and outlines opportunities for further development and future assessments.
DOT National Transportation Integrated Search
2015-09-23
This research project aimed to develop a remote sensing system capable of rapidly identifying fine-scale damage to critical transportation infrastructure following hazard events. Such a system must be pre-planned for rapid deployment, automate proces...
Jaberi, Ramin; Siavashpour, Zahra; Aghamiri, Mahmoud Reza; Kirisits, Christian; Ghaderi, Reza
2017-12-01
Intra-fractional organs at risk (OARs) deformations can lead to dose variation during image-guided adaptive brachytherapy (IGABT). The aim of this study was to modify the final accepted brachytherapy treatment plan to dosimetrically compensate for these intra-fractional organs-applicators position variations and, at the same time, fulfilling the dosimetric criteria. Thirty patients with locally advanced cervical cancer, after external beam radiotherapy (EBRT) of 45-50 Gy over five to six weeks with concomitant weekly chemotherapy, and qualified for intracavitary high-dose-rate (HDR) brachytherapy with tandem-ovoid applicators were selected for this study. Second computed tomography scan was done for each patient after finishing brachytherapy treatment with applicators in situ. Artificial neural networks (ANNs) based models were used to predict intra-fractional OARs dose-volume histogram parameters variations and propose a new final plan. A model was developed to estimate the intra-fractional organs dose variations during gynaecological intracavitary brachytherapy. Also, ANNs were used to modify the final brachytherapy treatment plan to compensate dosimetrically for changes in 'organs-applicators', while maintaining target dose at the original level. There are semi-automatic and fast responding models that can be used in the routine clinical workflow to reduce individually IGABT uncertainties. These models can be more validated by more patients' plans to be able to serve as a clinical tool.
Application of the Convergence Technique to Basic Studies of the Reading Process. Final Report.
ERIC Educational Resources Information Center
Gephart, William J.
This study covers a program of research on problems in the area of reading undertaken and supported by the U. S. Office of Education. Due to the effectiveness of the Convergence Technique in the planning and management of complex programs of bio-medical research, this project is undertaken to develop plans for the application of this technique in…
ERIC Educational Resources Information Center
Mattatuck Community Coll., Waterbury, CT.
This document contains a developmental curriculum plan for an articulated curriculum in automotive mechanics for Connecticut's Mattatuck Community College and area high schools. The curriculum guide includes a course description, criteria for evaluation, attendance policy, objectives, a curriculum outline, a three-part automotive technician test,…
ERIC Educational Resources Information Center
Mulholland, Ann M.; Fellendorf, George W.
State needs in public school education for the hearing impaired and steps in the development of comprehensive state planning are presented along with recommendations of conference participants, a summary report, and models for regional planning, day programs, and the team approach. The interest of the Alexander Graham Bell Association and the U.S.…
ERIC Educational Resources Information Center
Axelrod, Joseph
In this report of a project on curriculum planning, a new language is developed for analyzing and describing "the curricular-instructional subsystem." Some of the data come from the author's experiences in planning and directing the Experimental Freshman-Year Program (EFP) at San Francisco State College, but most were collected at the…
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAC06000.L16100000.DQ0000.LXSS095B0000] Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final Environmental... prepared the Proposed Resource Management Plan (RMP) and Final Environmental Impact Statement (EIS) for the...
Effect of the Family and Medical Leave Act on the operation of cafeteria plans. Final regulations.
2001-10-17
This document contains final regulations relating to cafeteria plans that reflect changes made by the Family and Medical Leave Act of 1993 (Act). The final regulations provide the public with guidance needed to comply with the Act and affect employees who participate in cafeteria plans.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
... General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort Pulaski National Monument... national monument, the Final EIS/GMP/WS will guide the management of the national monument over the next 20... publication of the Environmental Protection Agency's Notice of Availability of the Final EIS/GMP/WS in the...
NASA Astrophysics Data System (ADS)
Kim, Kwang Hyeon; Lee, Suk; Shim, Jang Bo; Yang, Dae Sik; Yoon, Won Sup; Park, Young Je; Kim, Chul Yong; Cao, Yuan Jie; Chang, Kyung Hwan
2018-01-01
The aim of this study was to derive a new plan-scoring index using normal tissue complication probabilities to verify different plans in the selection of personalized treatment. Plans for 12 patients treated with tomotherapy were used to compare scoring for ranking. Dosimetric and biological indexes were analyzed for the plans for a clearly distinguishable group ( n = 7) and a similar group ( n = 12), using treatment plan verification software that we developed. The quality factor ( QF) of our support software for treatment decisions was consistent with the final treatment plan for the clearly distinguishable group (average QF = 1.202, 100% match rate, n = 7) and the similar group (average QF = 1.058, 33% match rate, n = 12). Therefore, we propose a normal tissue complication probability (NTCP) based on the plan scoring index for verification of different plans for personalized treatment-plan selection. Scoring using the new QF showed a 100% match rate (average NTCP QF = 1.0420). The NTCP-based new QF scoring method was adequate for obtaining biological verification quality and organ risk saving using the treatment-planning decision-support software we developed for prostate cancer.
78 FR 21245 - Continuity of Operations Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-10
...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...
Regular Class Participation System (RCPS). A Final Report.
ERIC Educational Resources Information Center
Ferguson, Dianne L.; And Others
The Regular Class Participation System (RCPS) project attempted to develop, implement, and validate a system for placing and maintaining students with severe disabilities in general education classrooms, with a particular emphasis on achieving both social and learning outcomes for students. A teacher-based planning strategy was developed and…
Development of a Competency-Based Vocational Education IEP Model. Final Report.
ERIC Educational Resources Information Center
Bloomsburg Univ., PA.
A project completed and field tested the concept of vocational instructors and special educators jointly planning curriculum objectives for the handicapped/special needs learner. The diagnostic-prescriptive individualized education (IEP) model developed at Bloomsburg University (Pennsylvania) or IEP Planner was used. Eight occupational areas were…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Caplan, M.; Tandon, R.; Callis, R.
The goal of this project was to develop the commercial capability in the US to sinter alumina oxide ceramic parts for the semiconductor manufacturing equipment industry. We planned to use the millimeter microwave (30 GHz) sintering system first developed by IAP in Russia.
DOT National Transportation Integrated Search
2017-06-13
MnDOT has already deployed an extensive infrastructure for Active Traffic Management (ATM) on I-35W and I-94 with plans to expand on other segments of the Twin Cities freeway network. The ATM system includes intelligent lane control signals (ILCS) sp...
Accounting Cluster Demonstration Program at Aloha High School. Final Report.
ERIC Educational Resources Information Center
Beaverton School District 48, OR.
A model high school accounting cluster program was planned, developed, implemented, and evaluated in the Beaverton, Oregon, school district. The curriculum was developed with the help of representatives from the accounting occupations in the Portland metropolitan area. Through management interviews, identification of on-the job requirements, and…
Model Vocational Curriculum Development. Final Report.
ERIC Educational Resources Information Center
Lake Stevens School District No. 4, WA.
This guidance instrument (student four-year planning form), middle school program, and student learning objectives for all career and vocational education courses to be changed or added represent the products of a Lake Stevens School District, Washington, curriculum development project. The guidance instrument is a form to be completed by…
2010-08-01
considered with other activities that require additional artificial night lighting. For instance, the development of the new town of Destiny planned...Mobarkey, M. Barak, A. Hoyzman, and O. Halevy, 2004. Monochromatic Light Stimuli During Embryogenesis Enhances Embryo Development and Posthatch
DOT National Transportation Integrated Search
2013-02-27
SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...
Teaching case studies on emergency evacuation : final report
DOT National Transportation Integrated Search
2011-02-15
Through the development of four Harvard Kennedy School case studies, this project explored the policy and institutional dimensions of emergency evacuation planning and implementation in two major metropolitan areas Houston and New Orleans. By pro...
2015-10-28
The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.
Lower Clearwater Aquatic Mammal Survey. Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mack, Curt; Kronemann, Loren A.; Eneas, Cheryl
BPA provided funding to collect baseline data on river otters to assist in developing mitigation implementation plans for river otters percent to the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, sections 1003 (b)(2) and (3). Distribution, movements, habitat use, and diets of river otters were investigated in the Clearwater River within the Nez Perce Indian Reservation from 1991-1992. The study outlined recommendations to guide development of mitigation implementation plans for riparian habitats. Sections of the Clearwater River were identified that if protected or enhanced would provide optimal benefit to otters. Habitat improvement alternatives were also outlinedmore » which could be used to enhance otter habitats.« less
Hutting, Nathan; Detaille, Sarah I; Engels, Josephine A; Heerkens, Yvonne F; Staal, J Bart; Nijhuis-van der Sanden, Maria Wg
2015-01-01
To develop a self-management program with an additional eHealth module, using the six steps of the intervention mapping (IM) protocol, to help employees with complaints of the arm, neck, and/or shoulder (CANS) cope with their problems. In Step 1 of the IM protocol, a needs assessment was performed consisting of a review of the Dutch multidisciplinary guidelines on CANS, and of focus group sessions with employees with CANS (n=15) and with relevant experts (n=17). After the needs assessment, the objectives of the intervention and the determinants of self-management at work were formulated (Step 2). Furthermore, theory-based intervention methods and practical strategies were selected (Step 3), and an intervention program (including the eHealth module) was developed (Step 4). Finally, plans for implementation and evaluation of the program were developed (Steps 5 and 6). Step 1 of the IM protocol revealed that employees with CANS should be stimulated to search for information about the cause of their complaints, about how to deal with their complaints, and in which manner they can influence their complaints themselves. In Step 2, the overall goal of the intervention was defined as "self-management behavior at work" with the aim to alleviate the perceived disability of the participants. Step 3 described how the intervention methods were translated into practical strategies, and goal setting was introduced as an important method for increasing self-efficacy. The product of Step 4 was the final program plan, consisting of 6-weekly group sessions of 2.5 hours each and an eHealth module. In Step 5, a recruitment plan and course materials were developed, a steering committee was set up, trainers were recruited, and the final program was tested. In Step 6, an evaluation plan was developed, which consists of a randomized controlled trial with a 12-month follow-up period and a qualitative evaluation (interviews) with some of the participants. This study resulted in a theory- and practice-based self-management program, based on behavioral change theories, guideline-related evidence, and practice-based knowledge that fits the needs of employees with CANS.
Information technology strategic planning: art or science?
Hutsell, Richard; Mancini-Newell, Lulcy
2005-01-01
It had been almost a decade since the hospitals that make up the Daughters of Charity Health System (DCHS) had engaged in a formal information technology strategic planning process. In the summer of 2002, as the health system re-formed, there was a unique opportunity to introduce a planning process that reflected the governance style of the new health system. DCHS embarked on this journey, with the CIO initiating and formally sponsoring the information technology strategic planning process in a dynamic and collaborative manner The system sought to develop a plan tailored to encompass both enterprise-wide and local requirements; to develop a governance model to engage the members of the local health ministries in plan development, both now and in the future; and to conduct the process in a manner that reflected the values of the Daughters of Charity. The DCHS CIO outlined a premise that the CIO would guide and be continuously involved in the development of this tailored process, in conjunction with an external resource. Together, there would be joint responsibility for introducing a flexible information technology strategic planning methodology; providing an education on the current state of healthcare IT, including future trends and success factors; facilitating support to tap into existing internal talent; cultivating a collaborative process to support both current requirements and future vision; and developing a well-functioning governance structure that would enable the plan to evolve and reflect user community requirements. This article highlights the planning process, including the lessons learned, the benchmarking during and in post-planning, and finally, but most importantly, the unexpected benefit that resulted from this planning process.
An Integrated Student Development Program. A Model for Small Colleges. Final Report to FIPSE.
ERIC Educational Resources Information Center
Willats, Bruce
A 3-year project at Dominican College of San Rafael (California) supported by a grant from the Fund for the Improvement of Postsecondary Education (FIPSE), is summarized. The project developed comprehensive integrated student development plan with four perspectives: (skills, stages, tasks, and styles) designed as a cornerstone of all academic and…
ERIC Educational Resources Information Center
Middlesex County Vocational and Technical High Schools, New Brunswick, NJ.
A project helped handicapped high school students to develop and implement realistic vocational plans and to develop functional skills in various areas associated with independent living. Designed as an evening course open to full time special needs vocational high school students, the program consisted of the following two components: (l) a…
26 CFR 1.401(a)(5)-1 - Special rules relating to nondiscrimination requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... compensation for A's final 5 plan years is as follows: 1995 plan year $10,500 1994 plan year $20,000 1993 plan... this section, an employee's final pay from the employer as of a plan year is the employee's compensation (as defined in section 414(q)(7)) for the year (ending with or within the 5-plan-year period...
NASA Technical Reports Server (NTRS)
Ortega, R.; Price, J. M.; Fox, D.
2000-01-01
This technical memorandum documents the results of the research to develop a concept for assessing the structural integrity of impacted composite structures using the strength degradation factor in conjunction with available finite element tools. For this purpose, a literature search was conducted, a plan for conducting impact testing on two laminates was developed, and a finite element model of the impact process was created. Specimens for the impact testing were fabricated to support the impact testing plan.
1989-04-01
and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan addresses...totaltriThelomethanes radmiutm CD 10(1) 5 .13)* 10(4 Larbon tetrachloride CCL4 0(3)5.4 ’tordane CDN0.004(l) 0.00046(5) CLI3oride CL 250,000(l...numerous carcinogenicity tests in a variety of animals indicate that dieldrin promotes only liver tumors and the tumors develop only in mice. On the basis of
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, J F
2007-01-31
This final report will cover work performed over the period of November 11, 2005 to September 30, 2006 on the contract to develop technologies using laser sources for radiation effects sciences. The report will discuss four topic areas; the laser source experiments on the Gekko Laser at Osaka, Japan, planning for the Charge State Freeze Out experiments to be performed in calendar year 2007, a review of previous xenon gasbags on the LANL Trident laser to provide planning support to the May-June 2007 HELEN experiments.
2008-07-28
This final rule prohibits Medicare Advantage (MA) organizations, including organizations offering MA plans to employer and union group health plan sponsors, from making midyear changes to nonprescription drug benefits, premiums, and cost-sharing submitted in their approved bids for a given contract year. This final rule also clarifies that MA organizations offering certain kinds of plans restricted to employer and union group health plan sponsors and not open to general enrollment may continue to offer benefit enhancements as they do currently, through means other than midyear benefit enhancements (MYBEs). Programs of all-inclusive care for elderly (PACE) are not subject to the provisions of this final rule and may continue to offer enhanced benefits as specified in our guidance for PACE plans.
2005-08-02
called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations
A Literature Review On Multimodal Freight Transportation Planning Under Disruptions
NASA Astrophysics Data System (ADS)
Rosyida, E. E.; Santosa, B.; Pujawan, I. N.
2018-04-01
This paper reviews publication that focuses on multimodal freight transportation planning under disruptions. In this paper, disruptions are specified by the level of the disruptions occurs and the scope of its effect. This becomes an important distinction since the cause and effect that may occur at different levels. The failure to make this distinction has implications for how we understand and manage. The reviewed papers include those that develop framework, model, and technical procedure for freight transportation. Finally, we provide an outlook of future research directions on the domain of transportation planning.
Kansas State Plan for Career Education. Final Report. F.Y. 1978, July 1, 1977--September 30, 1978.
ERIC Educational Resources Information Center
InterAmerica Research Associates, Lawrence, KS.
A two-year project was undertaken in Kansas to develop a five-year plan for career education in the state. The first year resulted in (1) a brief summary of previous work done in Kansas since the introduction of the career education concept, (2) establishment of a definition of career education, (3) a description of various resources that can be…
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADAMS, WADE C
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADAMS, WADE C
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.
AutoLock: a semiautomated system for radiotherapy treatment plan quality control
Lowe, Matthew; Hardy, Mark J.; Boylan, Christopher J.; Whitehurst, Philip; Rowbottom, Carl G.
2015-01-01
A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock. PACS number: 87.55.Qr PMID:26103498
AutoLock: a semiautomated system for radiotherapy treatment plan quality control.
Dewhurst, Joseph M; Lowe, Matthew; Hardy, Mark J; Boylan, Christopher J; Whitehurst, Philip; Rowbottom, Carl G
2015-05-08
A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...
DOT National Transportation Integrated Search
2017-03-01
This study explores the communication of quality expectations between the Office of Environment Services (OES) and environmental consulting firms contributing to the Plan Development Process of the Georgia Department of Transportation (GDOT). The ove...
7 CFR 1924.10 - Making changes in the planned development.
Code of Federal Regulations, 2010 CFR
2010-01-01
... decrease in the cash cost, extension of time, transfer of funds between items, or an addition or deletion... respective costs. (ii) Changes in facility design. (iii) Any decrease or increase in unit-price on final...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-27
... develop standards for wastewater discharges produced by natural gas extraction from underground coalbed and shale formations as well as mercury discharges from dental offices. EPA is also accepting...
Community-Based Financing of Family Planning in Developing Countries: A Systematic Review.
Karra, Mahesh; Canning, David; Hu, Janice; Ali, Moazzam; Lissner, Craig
2016-12-01
In this systematic review, we gather evidence on community financing schemes and insurance programs for family planning in developing countries, and we assess the impact of these programs on primary outcomes related to contraceptive use. To identify and evaluate the research findings, we adopt a four-stage review process that employs a weight-of-evidence and risk-of-bias analytic approach. Out of 19,138 references that were identified, only four studies were included in our final analysis, and only one study was determined to be of high quality. In the four studies, the evidence on the impact of community-based financing on family planning and fertility outcomes is inconclusive. These limited and mixed findings suggest that either: 1) more high-quality evidence on community-based financing for family planning is needed before any conclusions can be made; or 2) community-based financing for family planning may, in fact, have little or no effect on family planning outcomes. © 2016 The Population Council, Inc.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-04
... the Final Staff Guidance Standard Review Plan Section 13.6.3, Revision 1 on Physical Security--Early... NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.3, Revision 1 on Physical Security...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-04
... the Final Staff Guidance Standard Review Plan Section 13.6.2, Revision 1 on Physical Security--Design... issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.2, Revision 1 on Physical Security--Design Certification...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-04
... the Final Staff Guidance Standard Review Plan, Section 13.6.1, Revision 1 on Physical Security... Availability. SUMMARY: The NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.1, Revision 1 on...
'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adonizio, Mary Ann; Corren, Dean; Smith, Ron
Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.
The Elements of an Effective Software Development Plan - Software Development Process Guidebook
2011-11-11
standards and practices required for all XMPL software development. This SDP implements the <corporate> Standard Software Process (SSP). as tailored...Developing and integrating reusable software products • Approach to managing COTS/Reuse software implementation • COTS/Reuse software selection...final selection and submit to change board for approval MAINTENANCE Monitor current products for obsolescence or end of support Track new
Achievement Motivation Development Project. Final Report.
ERIC Educational Resources Information Center
McClelland, Dave C.; Alschuler, Alfred S.
Two efforts were made to develop achievement motivation in school children and to observe the effect of such training on their behavior in and out of school. These studies were undertaken because: (1) Achievement motivation might help children think more seriously about their work habits and career planning; (2) It might improve the grades of…
Basic Skills and Job Retention. Final Report.
ERIC Educational Resources Information Center
Seminole Community Coll., Sanford, FL.
A project developed an educational model to deliver academic remediation services to small businesses at a cost-effective rate by using a lead instructor and volunteer assistants. The first step was planning and implementing the tutor training segment. The class and accompanying manual were developed, and tutors were identified and trained in a…
Development of an Interdisciplinary Workshop in Urban Transportation. Final Substantive Report.
ERIC Educational Resources Information Center
Foa, Joseph V.
This project has developed an interdisciplinary graduate workshop in transportation engineering to acquaint students with problems of urban transportation and the role of various disciplines in dealing with these problems. It provides an opportunity for students from the fields of engineering, urban and regional planning, and economics to interact…
DOT National Transportation Integrated Search
2016-06-30
The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...
SURVEY OF INFORMATION ON VOCATIONAL AND TECHNICAL EDUCATION IN THE STATE OF ILLINOIS. FINAL REPORT.
ERIC Educational Resources Information Center
Corplan Associates, Chicago, IL. Technology Center.
THE BASIC OBJECTIVE OF THE SURVEY WAS TO GATHER INFORMATION HELPFUL IN PLANNING AND DEVELOPING VOCATIONAL AND TECHNICAL EDUCATION PRIMARILY WITHIN THE PUBLIC SCHOOL SYSTEM. OCCUPATIONAL NEEDS WERE IDENTIFIED FROM FORECASTS OF CHANGES IN CURRENT OCCUPATIONS, AN ANALYSIS OF THE IMPLICATIONS OF SCIENTIFIC AND TECHNOLOGICAL DEVELOPMENTS, AND…
Allied Health Manpower Training Model. Final Report. June 27, 1973-January 31, 1975.
ERIC Educational Resources Information Center
Lutheran Medical Center, Brooklyn, NY.
The purpose of the Allied Health Manpower Training Model Project has been to develop a comprehensive manpower development program for health professionals that will serve as a model for other training institutions and health care organizations as they undertake continuing manpower planning and reorganization to meet the changing requirements for…
ERIC Educational Resources Information Center
Walker, Kristen L.; Kiesler, Tina; Malone, Summer
2016-01-01
This project involved the development of a comprehensive and educational social marketing communications plan designed to help educate middle-school-aged youth about information use and abuse online. We achieved our goal of enhancing digital information literacy while developing critical thinking and creative communication skills for…
Small Business Incubator Educational Development Program Education & Training Center. Final Report.
ERIC Educational Resources Information Center
Green River Community Coll., Auburn, WA.
The establishment of Green River Community College's Education and Training Center as a permanent anchor tenant in the Kent Business Incubator required the college to develop a comprehensive business plan and needs assessment survey. College and community leaders identified the role and services of the educational tenant, leading to the…
NASA Technical Reports Server (NTRS)
Stebbins, Robin
2016-01-01
The Astrophysics Implementation Plan calls for a minority role in L3, planned for launch in 2034. L3 The third large mission in ESAs Cosmic Visions 2015-2025 Programme NASA and ESA have been discussing a collaboration for 2 years Gravitational Observatory Advisory Team (GOAT) ESA study evaluating and recommend scientific performance tradeoffs, detection technologies, technology development activities, data analysis capabilities, schedule and cost US representatives: Guido Mueller, Mark Kasevich, Bill Klipstein, RTS Started in October 2014, concluding with a final report in late Marchor early April 2016. ESA solicited interest from ESA Member States in November 2015 NASA is continuing technology development support. ESA is restarting technology development activities.
Jaberi, Ramin; Aghamiri, Mahmoud Reza; Kirisits, Christian; Ghaderi, Reza
2017-01-01
Purpose Intra-fractional organs at risk (OARs) deformations can lead to dose variation during image-guided adaptive brachytherapy (IGABT). The aim of this study was to modify the final accepted brachytherapy treatment plan to dosimetrically compensate for these intra-fractional organs-applicators position variations and, at the same time, fulfilling the dosimetric criteria. Material and methods Thirty patients with locally advanced cervical cancer, after external beam radiotherapy (EBRT) of 45-50 Gy over five to six weeks with concomitant weekly chemotherapy, and qualified for intracavitary high-dose-rate (HDR) brachytherapy with tandem-ovoid applicators were selected for this study. Second computed tomography scan was done for each patient after finishing brachytherapy treatment with applicators in situ. Artificial neural networks (ANNs) based models were used to predict intra-fractional OARs dose-volume histogram parameters variations and propose a new final plan. Results A model was developed to estimate the intra-fractional organs dose variations during gynaecological intracavitary brachytherapy. Also, ANNs were used to modify the final brachytherapy treatment plan to compensate dosimetrically for changes in ‘organs-applicators’, while maintaining target dose at the original level. Conclusions There are semi-automatic and fast responding models that can be used in the routine clinical workflow to reduce individually IGABT uncertainties. These models can be more validated by more patients’ plans to be able to serve as a clinical tool. PMID:29441094
Challenges of Moving IPG into Production
NASA Technical Reports Server (NTRS)
Schulbach, Cathy
2004-01-01
Over the past 5-6 years, NASA has been developing the Information Power Grid and has a persistent testbed currently based on GT2.4.2. This presentation will begin with an overview of IPG status and services, discuss key milestones in IPG development, and present early as well as expected applications. The presentation will discuss some of the issues encountered in developing a grid including the tension between providing centralized and distributed computing. These issues also affect how the grid is moved into full production. Finally, the presentation will provide current plans for moving IPG into full production, including gaining broad user input, developing acceptance criteria from the production operations group, planning upgrades, and training users.
Coordinating robot motion, sensing, and control in plans. LDRD project final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xavier, P.G.; Brown, R.G.; Watterberg, P.A.
1997-08-01
The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The projectmore » considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.« less
EPA is taking final rulemaking action to approve, as part of the State Implementation Plan (SIP) for the State of Arizona, the second 10-year maintenance plan for the Douglas maintenance area for the 1971 National Ambient Air Quality Standards for SO2.
Improved Virtual Planning for Bimaxillary Orthognathic Surgery.
Hatamleh, Muhanad; Turner, Catherine; Bhamrah, Gurprit; Mack, Gavin; Osher, Jonas
2016-09-01
Conventional model surgery planning for bimaxillary orthognathic surgery can be laborious, time-consuming and may contain potential errors; hence three-dimensional (3D) virtual orthognathic planning has been proven to be an efficient, reliable, and cost-effective alternative. In this report, the 3D planning is described for a patient presenting with a Class III incisor relationship on a Skeletal III base with pan facial asymmetry complicated by reverse overjet and anterior open bite. A combined scan data of direct cone beam computer tomography and indirect dental scan were used in the planning. Additionally, a new method of establishing optimum intercuspation by scanning dental casts in final occlusion and positioning it to the composite-scans model was shown. Furthermore, conventional model surgery planning was carried out following in-house protocol. Intermediate and final intermaxillary splints were produced following the conventional method and 3D printing. Three-dimensional planning showed great accuracy and treatment outcome and reduced laboratory time in comparison with the conventional method. Establishing the final dental occlusion on casts and integrating it in final 3D planning enabled us to achieve the best possible intercuspation.
Advanced planning for ISS payload ground processing
NASA Astrophysics Data System (ADS)
Page, Kimberly A.
2000-01-01
Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
... units, retail (125,000 square feet (sq ft)), research and development (R&D) (2.5 million sq ft... the development as necessary. Alternative 1A (the ``Stadium Plan/No Bridge Alternative'') includes the disposal of HPS by the DoN and its reuse with the same level, land use types, and density of development as...
2002-04-09
This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
... the SIP. Accordingly, it affords no opportunity for EPA to fashion for small entities less burdensome... procedures, and business practices) that are developed or adopted by voluntary consensus standards bodies...
Smart sign enhancement, phase 2 : final report, September 2007.
DOT National Transportation Integrated Search
2007-09-01
An on line ordering system, called Smart Sign Ordering System (SSOS), was : developed by The University of Akron for Ohio Department of Transportation (ODOT) : in 2004. Driven by the demand of managing planning, fabrication, packaging and : delivery,...
(Handicap opportunities and programs in employment). Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moon, J.P.C.
1980-01-01
Passive solar windowbox heaters were constructed by handicapped individuals and displayed in Vermont public buildings. The training enables the majority of the participants to qualify for other employment using skills developed during planning and constructing the devices. (PSB)
DOT National Transportation Integrated Search
2016-10-14
Milestones Since Last Workshop - Finalized GPS/GNSS receiver test plan and test procedures - Coordinated government and manufacturer participation and executed Non-Disclosure Agreements (NDAs) - Developed/validated radiated RF test environment - Carr...
Multimodal Trip Planner System final evaluation report.
DOT National Transportation Integrated Search
2011-05-01
This evaluation of the Multimodal Trip Planning System (MMTPS) is the culmination of a multi-year project evaluating the development and deployment of a multimodal trip planner in the Chicagoland area between 2004 and 2010. The report includes an ove...
Tampa Bay Area Integrated Transportation Information System, Final Report
DOT National Transportation Integrated Search
1993-09-01
THE FLORIDA DEPARTMENT OF TRANSPORTATION ENTERED INTO A CONTRACT WITH THE UNIVERSITY OF SOUTH FLORIDA ON BEHALF OF THE CENTER FOR URBAN TRANSPORTATION RESEARCH (CUTR) TO DEVELOP AN ACTION PLAN FOR THE IMPLEMENTATION OF AN INTEGRATED TRANSPORTATION IN...
DOT National Transportation Integrated Search
2009-02-01
The Next Generation 9-1-1 (NG9-1-1) Initiative is a research and development project funded by the US Department of Transportation (USDOT) to define the framework and plan to deploy Internet Protocol (IP)-based emergency communications across the nat...
IT strategic planning in hospitals: from theory to practice.
Jaana, Mirou; Teitelbaum, Mari; Roffey, Tyson
2014-07-01
To date, IT strategic planning has been mostly theory-based with limited information on "best practices" in this area. This study presents the process and outcomes of IT strategic planning undertaken at a pediatric hospital (PH) in Canada. A five-stage sequential and incremental process was adopted. Various tools / approaches were used including review of existing documentation, internal survey (n = 111), fifteen interviews, and twelve workshops. IT strategic planning was informed by 230 individuals (12 percent of hospital community) and revealed consistency in the themes and concerns raised by participants (e.g., slow IT projects delivery rate, lack of understanding of IT priorities, strained communication with IT staff). Mobile and remote access to patients' information, and an integrated EMR were identified as top priorities. The methodology and used approach revealed effective, improved internal relationships, and ensured commitment to the final IT strategic plan. Several lessons were learned including: maintaining a dynamic approach capable of adapting to the fast technology evolution; involving stakeholders and ensuring continuous communication; using effective research tools to support strategic planning; and grounding the process and final product in existing models. This study contributes to the development of "best practices" in IT strategic planning, and illustrates "how" to apply the theoretical principles in this area. This is especially important as IT leaders are encouraged to integrate evidence-based management into their decision making and practices. The methodology and lessons learned may inform practitioners in other hospitals planning to engage in IT strategic planning in the future.
Energy conserving site design case study: Shenandoah, Georgia. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as amore » passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)« less
Payload Crew Training Complex (PCTC) utilization and training plan
NASA Technical Reports Server (NTRS)
Self, M. R.
1980-01-01
The physical facilities that comprise the payload crew training complex (PCTC) are described including the host simulator; experiment simulators; Spacelab aft flight deck, experiment pallet, and experiment rack mockups; the simulation director's console; payload operations control center; classrooms; and supporting soft- and hardware. The parameters of a training philosophy for payload crew training at the PCTC are established. Finally the development of the training plan is addressed including discussions of preassessment, and evaluation options.
ERIC Educational Resources Information Center
Pressley, Warren H., Jr.
In response to the great need for less than baccalaureate degree programs in Maine, a grant was made to finance the development of the three programs described here. Offered are a AA degree program in Hotel, Motel, and Restaurant Management, a program of inservice education in Respiratory Therapy which should serve as a model for programs in other…
Seattle To Portland Inter-City ITS Corridor Study And Communications Plan, Final Report
DOT National Transportation Integrated Search
1996-03-01
THIS DOCUMENT IS THE FINAL REPORT PRESENTING THE SEATTLE TO PORTLAND INTELLIGENT TRANSPORTATION SYSTEM (ITS) EARLY DEPLOYMENT PLAN. THE FINAL REPORT SYNTHESIZES INFORMATION FROM TECHNICAL MEMORANDUMS 1 THROUGH 5; INCLUDING EXISTING AND FUTURE CONDITI...
[On the Cairo polemic: a comparative perspective].
Vilar, D
1994-01-01
The International Conference on Population and Development held in Cairo in early September 1994 dealt with the subjects of sexuality and reproduction as well as the relationships of population growth, economic development, the environment, and population policies. The preceding conferences were held in Bucharest in 1974 and in Mexico City in 1984. At the 1974 conference a call for a new international order was voiced. China was in the midst of the Cultural Revolution and she rejected any suggestion of control of population growth, while the Vatican defended its traditional views against family planning and abortion. At the 1984 conference a number of developing countries already expressed the need for control of population growth in combination with the promotion of economic development. The US position under the Reagan Administration dismissed the idea that population growth presented a threat to stability and the environment, maintaining that economic growth would provide the solution. It also attacked the right to abortion and terminated its assistance to international family planning organizations. China introduced a new one-child family planning policy and this time she advocated the use of family planning. The 1994 Cairo Conference occurred in the wake of the end of the Cold War, the consolidation of the European Union, and the emergence of the threat of AIDS. It focused on the pivotal issue of the situation of women while emphasizing economic development. There was also progress in the final resolution compared to previous conferences: incorporation of the concepts of sexual and reproductive health, family planning, fertility regulation, safe motherhood, the elimination of unsafe abortion, the need for sex education, and the sexual health of young people. These items were forcefully opposed by the Vatican and Islamic fundamentalists. Nongovernmental organizations played a major role in preparing the final document, which stressed the interconnectedness of poverty and population growth.
SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu, C
Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary,more » orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.« less
Paula-Moraes, S; Burkness, E C; Hunt, T E; Wright, R J; Hein, G L; Hutchison, W D
2011-12-01
Striacosta albicosta (Smith) (Lepidoptera: Noctuidae), is a native pest of dry beans (Phaseolus vulgaris L.) and corn (Zea mays L.). As a result of larval feeding damage on corn ears, S. albicosta has a narrow treatment window; thus, early detection of the pest in the field is essential, and egg mass sampling has become a popular monitoring tool. Three action thresholds for field and sweet corn currently are used by crop consultants, including 4% of plants infested with egg masses on sweet corn in the silking-tasseling stage, 8% of plants infested with egg masses on field corn with approximately 95% tasseled, and 20% of plants infested with egg masses on field corn during mid-milk-stage corn. The current monitoring recommendation is to sample 20 plants at each of five locations per field (100 plants total). In an effort to develop a more cost-effective sampling plan for S. albicosta egg masses, several alternative binomial sampling plans were developed using Wald's sequential probability ratio test, and validated using Resampling for Validation of Sampling Plans (RVSP) software. The benefit-cost ratio also was calculated and used to determine the final selection of sampling plans. Based on final sampling plans selected for each action threshold, the average sample number required to reach a treat or no-treat decision ranged from 38 to 41 plants per field. This represents a significant savings in sampling cost over the current recommendation of 100 plants.
ActiveWV: a systematic approach to developing a physical activity plan for West Virginia.
Elliott, Eloise; Jones, Emily; Bulger, Sean
2014-03-01
Modeled after the National Physical Activity Plan (NPAP), ActiveWV 2015: The West Virginia Physical Activity Plan was developed to provide strategic direction for physical activity promotion within the state. The purpose of this manuscript is to describe the systematic approach taken in developing ActiveWV. Plan development began with establishing capacity and leadership among key stakeholders representing all societal sectors. A multiphase, statewide decision-making process allowed for input across sectors and geographic regions. The process results identified five priority areas that served as the conceptual framework for ActiveWV. Sector teams, comprised of key organization stakeholders across the eight sectors, finalized the sector-specific strategies and tactics using the NPAP evidence-based recommendations, results from a formalized strategic process, and the teams' expertise and experience. ActiveWV was officially released on January 19, 2012 at the State Capitol in Charleston, West Virginia. Community events throughout the state surrounded the release and celebrated West Virginia Physical Activity Day. Ongoing implementation and dissemination efforts are underway at state and local levels. As the NPAP calls for states and communities to develop plans that meet the needs of their particular context, other states may find the lessons learned from West Virginia helpful in the development process.
2010-11-17
This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.
Excavated Soils Management Plan for AOCs 44 and 52, Fort Devens
1994-05-01
I FORT DEVENS AOCs 44 AND 52 I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN DATA ITEM A009I I U 20070424310 I CONTRACT DAAA15-91-D-0008 I U.S. ARMY...obselete FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS Prepared for. U.S. Army Enviromnental Center Aberdeen Proving Ground, Maryland...BLANK 3 I I I I I I I I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS TABLE OF CONTENTS 1 Section Title Page No. 1.0
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...
ERIC Educational Resources Information Center
National Archives and Records Administration, 2006
2006-01-01
The Assistant Secretary for Special Education and Rehabilitative Services (OSERS) publishes the Final Long-Range Plan (Final Plan) for the National Institute on Disability and Rehabilitation Research (NIDRR) for FY 2005 through 2009. As required by the Rehabilitation Act of 1973, as amended (Act), the Assistant Secretary takes this action to…
Changing strategy in malaria control
Pampana, E. J.
1954-01-01
Residual-insecticide spraying methods may lead to the eradication of malaria from a country or from an area of it, and therefore to the possibility that the spraying campaign may eventually be discontinued. This is the final target to be aimed at in planning national malaria-control campaigns. As it is now known that some anopheline vector species may develop resistance to insecticides, a plea is made that control programmes should be planned to cover such large areas and with such criteria of efficiency as to eradicate malaria and to enable the campaign to be discontinued before resistance may have developed. PMID:13209311
Eco-approach and Eco-departure planning study : final report.
DOT National Transportation Integrated Search
2016-01-31
A long term (10 year) research roadmap is proposed to guide the development and potential deployment of Eco-Approach and Departure (Eco A/D) functionality at signalized intersections, with a focus on commercialization of initial system concepts in 5+...
Best practices in transit service planning : final report, March 2009.
DOT National Transportation Integrated Search
2009-03-01
The provision of cost efficient and effective bus transit service is the basic premise upon which transit service is developed and the goal that all public transportations agencies strive to achieve. To attain this goal, public transit agencies must ...
District of Columbia tour bus management initiative final report.
DOT National Transportation Integrated Search
2003-10-01
The objective of the District of Columbia Tour Bus Management Initiative is to develop a plan that will ameliorate the long-standing problems, as identified above, that negatively affect tour bus operations as well as traffic conditions, the visitor ...
Human Space Flight Plans Committee
2009-08-11
Dr. Edward Crawley, Ford Professor of Engineering at MIT and co-chair, NASA Exploration Technology Development Program Review Committee speaks during the final meeting of the Human Space Flight Review Committee, Wednesday, Aug. 12, 2009, in Washington. Photo Credit: (NASA/Paul E. Alers)
Kent State University's sustainable transportation initiative : final report.
DOT National Transportation Integrated Search
2008-01-01
This past year the author embarked on a study of sustainable transportation options in and around Kent State Universitys campus, including much of the city of Kent itself. Kents most recent Comprehensive Plan attempted to develop a model for th...
Liu, Y S; Li, Z; Zhao, Y J; Ye, H Q; Zhou, Y Q; Hu, W J; Liu, Y S; Xun, C L; Zhou, Y S
2018-02-18
To develop a digital workflow of orthodontic-prosthodontic multidisciplinary treatment plan which can be applied in complicated anterior teeth esthetic rehabilitation, in order to enhance the efficiency of communication between dentists and patients, and improve the predictability of treatment outcome. Twenty patients with the potential needs of orthodontic-prosthodontic multidisciplinary treatment to solve their complicated esthetic problems in anterior teeth were recruited in this study. Digital models of patients' both dental arches and soft tissues were captured using intra oral scanner. Direct prosthodontic (DP) treatment plan and orthodontic-prosthodontic (OP) treatment plan were carried out for each patient. For DP treatment plans, digital wax-up models were directly designed on original digital models using prosthodontic design system. For OP treatment plans, virtual-setups were performed using orthodontic analyze system according to orthodontic and esthetic criteria and imported to prosthodontic design system to finalize the digital wax-up models. These two treatment plans were shown to the patients and demonstrated elaborately. Each patient rated two treatment plans using visual analogue scales and the medians of scores of two treatment plans were analyzed using signed Wilcoxon test. Having taken into consideration various related factors, including time, costs of treatment, each patient chose a specific treatment plan. For the patients chose DP treatment plans, digital wax-up models were exported and printed into resin diagnostic models which would be utilized in the prosthodontic treatment process. For the patients chose OP treatment plans, virtual-setups were used to fabricate aligners or indirect bonding templates and digital wax-up models were also exported and printed into resin diagnostic models for prosthodontic treatment after orthodontic treatment completed. The medians of scores of DP treatment plan and OP treatment plan were calculated and analyzed by IBM SPSS 20. The median of scores of DP treatment plan was 8.4, the minimum value was 6.9 and the maximum value was 9.3. The median of scores of OP treatment plan was 9.0, the minimum value was 7.9 and the maximum value was 9.6. The median of scores of OP was significantly higher than that of DP (Z=-3.23, P<0.01). Finally, 12 patients chose OP treatment plans and 8 patients chose DP treatment plans. For cases with complex esthetic problems in anterior teeth, a digital workflow can demonstrate final treatment outcome and help patients make suitable treatment decisions. In our study, the orthodontic-prosthodontic multidisciplinary treatment plan is feasible which can provide predictions of treatment outcome and improve esthetic outcome with patients' satisfaction.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
... Implementation Plan; Prevention of Significant Deterioration; California; North Coast Unified Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited Federal Implementation Plan (FIP) for the North Coast Unified Air Quality Management...
29 CFR 1952.313 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 1902. Accordingly, the Hawaii plan was granted final approval and concurrent Federal enforcement... employment in Hawaii. The plan does not cover maritime employment in the private sector; Federal government... effective as operations under the Federal program; to submit plan supplements in accordance with 29 CFR part...
29 CFR 1952.294 - Final approval determination.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...
29 CFR 1952.294 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...
1992-01-01
dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U
ERIC Educational Resources Information Center
Curtis, W. Scott
The purpose of this project was to inquire into the current status of development, past use, availability, and future planning of intelligence tests for the visually handicapped in relation to the fields of psychological, educational, and vocational counseling. The project procedure was that of a research utilization conference involving the…
NASA Technical Reports Server (NTRS)
1975-01-01
Preliminary development plans, analysis of required R and D and production resources, the costs of such resources, and, finally, the potential profitability of a commercial space processing opportunity for the production of very high frequency surface acoustic wave devices are presented.
Financial issues for commercial space ventures: Paying for the dreams
NASA Technical Reports Server (NTRS)
Egan, J. J.
1984-01-01
Various financial issues involved in commercial space enterprise are discussed. Particular emphasis is placed on the materials processing area: the current state of business plan and financial developments, what is needed for enhanced probability of success of future materials development efforts in attracting financial backing, and finally, the risks involved in this entire business area.
School-Based Job Placement Service Model: Phase I, Planning. Final Report.
ERIC Educational Resources Information Center
Gingerich, Garland E.
To assist school administrators and guidance personnel in providing job placement services, a study was conducted to: (1) develop a model design for a school-based job placement system, (2) identify students to be served by the model, (3) list specific services provided to students, and (4) develop job descriptions for each individual responsible…
Report of Activities and Accomplishments: March 1, 1968 to February 28, 1969. Final Report.
ERIC Educational Resources Information Center
Green, Thomas F.; And Others
From 1968 to 1969 the EPRC focused on: staff development, definition of a specific research program, and development of methods to deal with educational policy issues in the context of longrange futures. The research program of the center is organized around educational futures and policy planning. Specific methods include Delphi techniques, goal…
Code of Federal Regulations, 2010 CFR
2010-07-01
... FACILITATE THE RETENTION OF DISPLACED BUSINESSES AND RESIDENTS IN THE PENNSYLVANIA AVENUE DEVELOPMENT AREA... preliminary or final plans, the Corporation shall explore the tenanting opportunities proposed by the... shall specify the mix of uses in the project, the rentals to be charged by type of use and location, the...
DOT National Transportation Integrated Search
2016-06-29
The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-21
... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Intent To Prepare a Draft Supplemental Environmental Impact Statement for Development of a Long-Term Sediment Management Plan of the... draft and final SEIS. b. Significant issues to be analyzed in depth in the DSEIS include alternatives...
ERIC Educational Resources Information Center
Montgomery County Public Schools, Rockville, MD.
In developing a program to assist the individual student to plan a goal-oriented program and increase his opportunities both to select courses moving him toward his personal goals and to use the community resources as supplemental educational experiences, the Winston Churchill High School designed a Career Cluster Curriculum Project, the first…
ERIC Educational Resources Information Center
Curtis, William H.; And Others
The main purpose of this project was to develop a blueprint for the future growth of the AASA-National Academy for School Executives. The resulting comprehensive model is displayed in outline form through the use of a conceptual framework that includes three major processes -- program planning and development, implementation, and evaluation. Each…
ERIC Educational Resources Information Center
Ezquerra, Ángel; Manso, Javier; Burgos, Mª Esther; Hallabrin, Carla
2014-01-01
New curricular plans based on key competences create the need for new educational proposals that allow their development. This article describes a proposal to develop key competences through project-based learning. The project's objective is the creation of a digital video. The following study was carried out with students in their final two years…
Comparison of treatment plans: a retrospective study by the method of radiobiological evaluation
NASA Astrophysics Data System (ADS)
Puzhakkal, Niyas; Kallikuzhiyil Kochunny, Abdullah; Manthala Padannayil, Noufal; Singh, Navin; Elavan Chalil, Jumanath; Kulangarakath Umer, Jamshad
2016-09-01
There are many situations in radiotherapy where multiple treatment plans need to be compared for selection of an optimal plan. In this study we performed the radiobiological method of plan evaluation to verify the treatment plan comparison procedure of our clinical practice. We estimated and correlated various radiobiological dose indices with physical dose metrics for a total of 30 patients representing typical cases of head and neck, prostate and brain tumors. Three sets of plans along with a clinically approved plan (final plan) treated by either Intensity Modulated Radiation Therapy (IMRT) or Rapid Arc (RA) techniques were considered. The study yielded improved target coverage for final plans, however, no appreciable differences in doses and the complication probabilities of organs at risk were noticed. Even though all four plans showed adequate dose distributions, from dosimetric point of view, the final plan had more acceptable dose distribution. The estimated biological outcome and dose volume histogram data showed least differences between plans for IMRT when compared to RA. Our retrospective study based on 120 plans, validated the radiobiological method of plan evaluation. The tumor cure or normal tissue complication probabilities were found to be correlated with the corresponding physical dose indices.
1991-09-01
putting all tasks directed towsrds achieving an outcome in aequence. The tasks can be viewed as steps in the process (39:2.3). Using this...improvement opportunity is investigated. A plan is developed, root causes are identified, and solutions are tested and implemented. The process is... solutions , check for actual improvement, and integrate the successful improvements into the process. ?UP 7. Check Improvement Performance. Finally, the
Hampp, Emily L; Chughtai, Morad; Scholl, Laura Y; Sodhi, Nipun; Bhowmik-Stoker, Manoshi; Jacofsky, David J; Mont, Michael A
2018-05-01
This study determined if robotic-arm assisted total knee arthroplasty (RATKA) allows for more accurate and precise bone cuts and component position to plan compared with manual total knee arthroplasty (MTKA). Specifically, we assessed the following: (1) final bone cuts, (2) final component position, and (3) a potential learning curve for RATKA. On six cadaver specimens (12 knees), a MTKA and RATKA were performed on the left and right knees, respectively. Bone-cut and final-component positioning errors relative to preoperative plans were compared. Median errors and standard deviations (SDs) in the sagittal, coronal, and axial planes were compared. Median values of the absolute deviation from plan defined the accuracy to plan. SDs described the precision to plan. RATKA bone cuts were as or more accurate to plan based on nominal median values in 11 out of 12 measurements. RATKA bone cuts were more precise to plan in 8 out of 12 measurements ( p ≤ 0.05). RATKA final component positions were as or more accurate to plan based on median values in five out of five measurements. RATKA final component positions were more precise to plan in four out of five measurements ( p ≤ 0.05). Stacked error results from all cuts and implant positions for each specimen in procedural order showed that RATKA error was less than MTKA error. Although this study analyzed a small number of cadaver specimens, there were clear differences that separated these two groups. When compared with MTKA, RATKA demonstrated more accurate and precise bone cuts and implant positioning to plan. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.
Courtney, Brooke; Hodge, James G; Toner, Eric S; Roxland, Beth E; Penn, Matthew S; Devereaux, Asha V; Dichter, Jeffrey R; Kissoon, Niranjan; Christian, Michael D; Powell, Tia
2014-10-01
Significant legal challenges arise when health-care resources become scarce and population-based approaches to care are implemented during severe disasters and pandemics. Recent emergencies highlight the serious legal, economic, and health impacts that can be associated with responding in austere conditions and the critical importance of comprehensive, collaborative health response system planning. This article discusses legal suggestions developed by the American College of Chest Physicians (CHEST) Task Force for Mass Critical Care to support planning and response efforts for mass casualty incidents involving critically ill or injured patients. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. Following the CHEST Guidelines Oversight Committee's methodology, the Legal Panel developed 35 key questions for which specific literature searches were then conducted. The literature in this field is not suitable to provide support for evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process resulting in seven final suggestions. Acceptance is widespread for the health-care community's duty to appropriately plan for and respond to severe disasters and pandemics. Hospitals, public health entities, and clinicians have an obligation to develop comprehensive, vetted plans for mass casualty incidents involving critically ill or injured patients. Such plans should address processes for evacuation and limited appeals and reviews of care decisions. To legitimize responses, deter independent actions, and trigger liability protections, mass critical care (MCC) plans should be formally activated when facilities and practitioners shift to providing MCC. Adherence to official MCC plans should contribute to protecting hospitals and practitioners who act in good faith from liability. Finally, to address anticipated staffing shortages during severe and prolonged disasters and pandemics, governments should develop approaches to formally expand the availability of qualified health-care workers, such as through using official foreign medical teams. As a fundamental element of health-care and public health emergency planning and preparedness, the law underlies critical aspects of disaster and pandemic responses. Effective responses require comprehensive advance planning efforts that include assessments of complex legal issues and authorities. Recent disasters have shown that although law is a critical response tool, it can also be used to hold health-care stakeholders who fail to appropriately plan for or respond to disasters and pandemics accountable for resulting patient or staff harm. Claims of liability from harms allegedly suffered during disasters and pandemics cannot be avoided altogether. However, appropriate planning and legal protections can help facilitate sound, consistent decision-making and support response participation among health-care entities and practitioners.
Courtney, Brooke; Hodge, James G.; Toner, Eric S.; Roxland, Beth E.; Penn, Matthew S.; Devereaux, Asha V.; Dichter, Jeffrey R.; Kissoon, Niranjan; Christian, Michael D.; Powell, Tia
2015-01-01
BACKGROUND Significant legal challenges arise when health-care resources become scarce and population-based approaches to care are implemented during severe disasters and pandemics. Recent emergencies highlight the serious legal, economic, and health impacts that can be associated with responding in austere conditions and the critical importance of comprehensive, collaborative health response system planning. This article discusses legal suggestions developed by the American College of Chest Physicians (CHEST) Task Force for Mass Critical Care to support planning and response efforts for mass casualty incidents involving critically ill or injured patients. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. METHODS Following the CHEST Guidelines Oversight Committee’s methodology, the Legal Panel developed 35 key questions for which specific literature searches were then conducted. The literature in this field is not suitable to provide support for evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process resulting in seven final suggestions. RESULTS Acceptance is widespread for the health-care community’s duty to appropriately plan for and respond to severe disasters and pandemics. Hospitals, public health entities, and clinicians have an obligation to develop comprehensive, vetted plans for mass casualty incidents involving critically ill or injured patients. Such plans should address processes for evacuation and limited appeals and reviews of care decisions. To legitimize responses, deter independent actions, and trigger liability protections, mass critical care (MCC) plans should be formally activated when facilities and practitioners shift to providing MCC. Adherence to official MCC plans should contribute to protecting hospitals and practitioners who act in good faith from liability. Finally, to address anticipated staffing shortages during severe and prolonged disasters and pandemics, governments should develop approaches to formally expand the availability of qualified health-care workers, such as through using official foreign medical teams. CONCLUSIONS As a fundamental element of health-care and public health emergency planning and preparedness, the law underlies critical aspects of disaster and pandemic responses. Effective responses require comprehensive advance planning efforts that include assessments of complex legal issues and authorities. Recent disasters have shown that although law is a critical response tool, it can also be used to hold health-care stakeholders who fail to appropriately plan for or respond to disasters and pandemics accountable for resulting patient or staff harm. Claims of liability from harms allegedly suffered during disasters and pandemics cannot be avoided altogether. However, appropriate planning and legal protections can help facilitate sound, consistent decision-making and support response participation among health-care entities and practitioners. PMID:25144203
PlanWorks: A Debugging Environment for Constraint Based Planning Systems
NASA Technical Reports Server (NTRS)
Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will
2005-01-01
Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.
Strategic planning in a complex academic environment: lessons from one academic health center.
Levinson, Wendy; Axler, Helena
2007-08-01
Leaders in academic health centers (AHCs) must create a vision for their academic unit embedded in a complex environment. A formal strategic planning process can be valuable to help shape a clear vision taking advantage of potential collaborations and to develop specific achievable long- and short-term goals. The authors describe the steps in a formal strategic planning process and illustrate it with the example of the Department of Medicine at the University of Toronto Faculty of Medicine beginning in 2004. The process included the active participation of over 300 faculty members, trainees, and stakeholders of the department and resulted in broad-based support and leadership for the resulting plan. The authors describe the steps, which include getting started, committing to planning principles, establishing the work plan, understanding the environment, pulling it all together, shaping the vision, testing strategic directions, building effective implementation, and promoting the plan. Articulation of vision, mission, and values informed the plan's development, as well as 10 key principles integral to the plan. Challenges and lessons learned are also described. The final strategic plan is an active core activity of the department, guiding decisions and resource allocation and facilitating measurement of success or shortcomings. The process the authors describe is applicable to multiple academic units, including divisions/sections, departments, or thematic programs in AHCs.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland for Transportation Conformity Regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final...
Energy: Ford Foundation Study Urges Action on Conservation
ERIC Educational Resources Information Center
Hammond, Allen L.
1974-01-01
Announces completion of a final report and summarizes recommendations of the Ford Foundation Energy Policy Project based on analyses of three different scenarios of how America's energy future might develop. The study urges that many conservation measures be planned and implemented. (RH)
Sample Return in Preparation for Human Mission on the Surface of Mars
NASA Astrophysics Data System (ADS)
Yun, P.
2018-04-01
Returned samples of martian regolith will help the science community make an informed decision in choosing the final human landing site and develop a better human mission plan to meet science criteria and IRSU and civil engineering criteria.
Optimizing snow plowing operations in urban road networks : final research report.
DOT National Transportation Integrated Search
2015-01-01
Due to the disruptive effect of snowstorms on cities, both in terms of : mobility and safety, the faster the streets can be cleared the better. Yet in : most cities (including Pittsburgh), static plans for snowplowing are : developed using simple all...
2000-11-21
This document contains a final rule amending the regulations governing the content of the Summary Plan Description (SPD) required to be furnished to employee benefit plan participants and beneficiaries under the Employee Retirement Income Security Act of 1974, as amended (ERISA). These amendments implement information disclosure recommendations of the President's Advisory Commission on Consumer Protection and Quality in the Health Care Industry, as set forth in their November 20, 1997, report, "Consumer Bill of Rights and Responsibilities." Specifically, the amendments clarify benefit, medical provider, and other information required to be disclosed in, or as part of, the SPD of a group health plan and repeal the limited exemption with respect to SPDs of welfare plans providing benefits through qualified health maintenance organizations (HMOs). In addition, this document contains several amendments updating and clarifying provisions relating to the content of SPDs that affect both pension and welfare benefit plans. This document also adopts in final form certain regulations that were effective on an interim basis implementing amendments to ERISA enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). This final rule will affect employee pension and welfare benefit plans, including group health plans, as well as administrators, fiduciaries, participants and beneficiaries of such plans.
Claims Procedure for Plans Providing Disability Benefits. Final rule.
2016-12-19
This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.
2012-07-20
This final rule establishes data collection standards necessary to implement aspects of section 1302 of the Patient Protection and Affordable Care Act (Affordable Care Act), which directs the Secretary of Health and Human Services to define essential health benefits. This final rule outlines the data on applicable plans to be collected from certain issuers to support the definition of essential health benefits. This final rule also establishes a process for the recognition of accrediting entities for purposes of certification of qualified health plans.
76 FR 40394 - Final Plan for Fiscal Year 2011
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1563] Final Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention.... SUMMARY: The Office of Juvenile Justice and Delinquency Prevention is publishing this notice of its Final...
Hutting, Nathan; Detaille, Sarah I; Engels, Josephine A; Heerkens, Yvonne F; Staal, J Bart; Nijhuis-van der Sanden, Maria WG
2015-01-01
Purpose To develop a self-management program with an additional eHealth module, using the six steps of the intervention mapping (IM) protocol, to help employees with complaints of the arm, neck, and/or shoulder (CANS) cope with their problems. Methods In Step 1 of the IM protocol, a needs assessment was performed consisting of a review of the Dutch multidisciplinary guidelines on CANS, and of focus group sessions with employees with CANS (n=15) and with relevant experts (n=17). After the needs assessment, the objectives of the intervention and the determinants of self-management at work were formulated (Step 2). Furthermore, theory-based intervention methods and practical strategies were selected (Step 3), and an intervention program (including the eHealth module) was developed (Step 4). Finally, plans for implementation and evaluation of the program were developed (Steps 5 and 6). Results Step 1 of the IM protocol revealed that employees with CANS should be stimulated to search for information about the cause of their complaints, about how to deal with their complaints, and in which manner they can influence their complaints themselves. In Step 2, the overall goal of the intervention was defined as “self-management behavior at work” with the aim to alleviate the perceived disability of the participants. Step 3 described how the intervention methods were translated into practical strategies, and goal setting was introduced as an important method for increasing self-efficacy. The product of Step 4 was the final program plan, consisting of 6-weekly group sessions of 2.5 hours each and an eHealth module. In Step 5, a recruitment plan and course materials were developed, a steering committee was set up, trainers were recruited, and the final program was tested. In Step 6, an evaluation plan was developed, which consists of a randomized controlled trial with a 12-month follow-up period and a qualitative evaluation (interviews) with some of the participants. Conclusion This study resulted in a theory- and practice-based self-management program, based on behavioral change theories, guideline-related evidence, and practice-based knowledge that fits the needs of employees with CANS. PMID:26170689
Dalum, Peter; Schaalma, Herman; Kok, Gerjo
2012-02-01
The objective of this project was to develop a theory- and evidence-based adolescent smoking cessation intervention using both new and existing materials. We used the Intervention Mapping framework for planning health promotion programmes. Based on a needs assessment, we identified important and changeable determinants of cessation behaviour, specified change objectives for the intervention programme, selected theoretical change methods for accomplishing intervention objectives and finally operationalized change methods into practical intervention strategies. We found that guided practice, modelling, self-monitoring, coping planning, consciousness raising, dramatic relief and decisional balance were suitable methods for adolescent smoking cessation. We selected behavioural journalism, guided practice and Motivational Interviewing as strategies in our intervention. Intervention Mapping helped us to develop as systematic adolescent smoking cessation intervention with a clear link between behavioural goals, theoretical methods, practical strategies and materials and with a strong focus on implementation and recruitment. This paper does not present evaluation data.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
... Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final Rule AGENCY: Environmental Protection... withdrawing the direct final rule to approve revisions to Maryland's State Implementation Plan (SIP). This SIP...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... and Environmental Impact Statement for Isle Royale National Park, MI AGENCY: National Park Service... the availability of a Final Wilderness and Backcountry Management Plan and Environmental Impact... the Internet through the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-14
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...
2008-10-03
This final rule provides guidance to States that want to administer self-directed personal assistance services through their State Plans, as authorized by the Deficit Reduction Act of 2005. The State plan option allows beneficiaries, through an approved self-directed services plan and budget, to purchase personal assistance services. The rule also provides guidance to ensure beneficiary health and welfare and financial accountability of the State Plan option.
Semiautomated Management Of Arriving Air Traffic
NASA Technical Reports Server (NTRS)
Erzberger, Heinz; Nedell, William
1992-01-01
System of computers, graphical workstations, and computer programs developed for semiautomated management of approach and arrival of numerous aircraft at airport. System comprises three subsystems: traffic-management advisor, used for controlling traffic into terminal area; descent advisor generates information integrated into plan-view display of traffic on monitor; and final-approach-spacing tool used to merge traffic converging on final approach path while making sure aircraft are properly spaced. Not intended to restrict decisions of air-traffic controllers.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-15
... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide.... Disposition: On May 13, 2010, the NRC staff issued the proposed Revision 0 on SRP Section 13.6.6 on ``Cyber...
Wilson, Lauren; Deokar, Angela J; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-Jo
The Center of Disease Control and Prevention's Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans for numerous outcomes.
Wilson, Lauren; Deokar, Angela J.; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-jo
2018-01-01
Context The Center of Disease Control and Prevention’s Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. Objective (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Design Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. Results For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. Conclusion The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans for numerous outcomes. PMID:29189505
GIS-based planning system for managing the flow of construction and demolition waste in Brazil.
Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo
2018-05-01
The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.
Sudore, Rebecca L.; Lum, Hillary D.; You, John J.; Hanson, Laura C.; Meier, Diane E.; Pantilat, Steven Z.; Matlock, Daniel D.; Rietjens, Judith A. C.; Korfage, Ida J.; Ritchie, Christine S.; Kutner, Jean S.; Teno, Joan M.; Thomas, Judy; McMahan, Ryan D.; Heyland, Daren K.
2017-01-01
Background Despite increasing interest in advance care planning (ACP) and prior ACP descriptions, a consensus definition does not yet exist to guide clinical, research, and policy initiatives. Objective To develop a consensus definition of ACP for adults. Design Delphi Panel Setting/Participants Participants included a multidisciplinary panel of international ACP experts consisting of 52 clinicians, researchers, and policy leaders from 4 countries, and a patient/surrogate advisory committee. Measurements We conducted 10 rounds of a modified Delphi method and qualitatively analyzed panelists’ input. Panelists identified several themes lacking consensus, and iteratively discussed and developed a final consensus definition. Results Panelists identified several tensions concerning ACP concepts such as whether the definition should focus on conversations vs. written advance directives; patients’ values vs. treatment preferences; current shared decision making vs. future medical decisions; and who should be included in the process. The panel achieved a final consensus one-sentence definition and accompanying goals statement: “Advance care planning is a process that supports adults at any age or stage of health in understanding and sharing their personal values, life goals, and preferences regarding future medical care. The goal of advance care planning is to help ensure that people receive medical care that is consistent with their values, goals and preferences during serious and chronic illness.” The panel also described strategies to best support adults in ACP. Conclusions A multidisciplinary Delphi panel developed a consensus definition for ACP for adults that can be used to inform implementation and measurement of ACP clinical, research, and policy initiatives. PMID:28062339
Sudore, Rebecca L; Lum, Hillary D; You, John J; Hanson, Laura C; Meier, Diane E; Pantilat, Steven Z; Matlock, Daniel D; Rietjens, Judith A C; Korfage, Ida J; Ritchie, Christine S; Kutner, Jean S; Teno, Joan M; Thomas, Judy; McMahan, Ryan D; Heyland, Daren K
2017-05-01
Despite increasing interest in advance care planning (ACP) and previous ACP descriptions, a consensus definition does not yet exist to guide clinical, research, and policy initiatives. The aim of this study was to develop a consensus definition of ACP for adults. We convened a Delphi panel of multidisciplinary, international ACP experts consisting of 52 clinicians, researchers, and policy leaders from four countries and a patient/surrogate advisory committee. We conducted 10 rounds using a modified Delphi method and qualitatively analyzed panelists' input. Panelists identified several themes lacking consensus and iteratively discussed and developed a final consensus definition. Panelists identified several tensions concerning ACP concepts such as whether the definition should focus on conversations vs. written advance directives; patients' values vs. treatment preferences; current shared decision making vs. future medical decisions; and who should be included in the process. The panel achieved a final consensus one-sentence definition and accompanying goals statement: "Advance care planning is a process that supports adults at any age or stage of health in understanding and sharing their personal values, life goals, and preferences regarding future medical care. The goal of advance care planning is to help ensure that people receive medical care that is consistent with their values, goals and preferences during serious and chronic illness." The panel also described strategies to best support adults in ACP. A multidisciplinary Delphi panel developed a consensus definition for ACP for adults that can be used to inform implementation and measurement of ACP clinical, research, and policy initiatives. Published by Elsevier Inc.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-29
... DEPARTMENT OF ENERGY Western Area Power Administration Revision to the Final Principles of... Administration (Western) published proposed Principles for Integrated Resource planning (IRP) for use in its... December 6, 1994. After considering public comments on the proposed principles, Western adopted the Final...
Fan, Jiawei; Wang, Jiazhou; Zhang, Zhen; Hu, Weigang
2017-06-01
To develop a new automated treatment planning solution for breast and rectal cancer radiotherapy. The automated treatment planning solution developed in this study includes selection of the iterative optimized training dataset, dose volume histogram (DVH) prediction for the organs at risk (OARs), and automatic generation of clinically acceptable treatment plans. The iterative optimized training dataset is selected by an iterative optimization from 40 treatment plans for left-breast and rectal cancer patients who received radiation therapy. A two-dimensional kernel density estimation algorithm (noted as two parameters KDE) which incorporated two predictive features was implemented to produce the predicted DVHs. Finally, 10 additional new left-breast treatment plans are re-planned using the Pinnacle 3 Auto-Planning (AP) module (version 9.10, Philips Medical Systems) with the objective functions derived from the predicted DVH curves. Automatically generated re-optimized treatment plans are compared with the original manually optimized plans. By combining the iterative optimized training dataset methodology and two parameters KDE prediction algorithm, our proposed automated planning strategy improves the accuracy of the DVH prediction. The automatically generated treatment plans using the dose derived from the predicted DVHs can achieve better dose sparing for some OARs without compromising other metrics of plan quality. The proposed new automated treatment planning solution can be used to efficiently evaluate and improve the quality and consistency of the treatment plans for intensity-modulated breast and rectal cancer radiation therapy. © 2017 American Association of Physicists in Medicine.
Consumer Information. Final Report.
ERIC Educational Resources Information Center
CEMREL, Inc., St. Ann, MO.
One of three projects reported by the Central Midwestern Regional Educational Laboratory included analysis of 178 existing consumer information products. Steps in the analytical scheme were preparation of an annotated bibliography and development of a plan for providing objective, comparative information on such products. These were found in the…
DOT National Transportation Integrated Search
2014-03-01
The Commercial Skills Test Information Management System (CSTIMS) was developed as a Web-based, software-as-a-service system to prevent and deter fraud perpetrated by third-party commercial drivers license (CDL) examiners in the portion of the CDL...
Final research findings on traffic-load forecasting using weigh-in-motion data
DOT National Transportation Integrated Search
1998-09-01
The overall objective of Project 7-987 was to develop a long-range pavement rehabilitation plan for a segment of US 59, a four-lane divided principal arterial highway in TxDOT's Lufkin District. To identify feasible pavement : structures, test sectio...
An action plan for risk management in the Virginia Department of Transportation : final report.
DOT National Transportation Integrated Search
1991-01-01
In part 3 of a three-phase effort, the Virginia Transportation Research Council was requested by the Virginia Department of Transportation (VDOT) to develop a comprehensive risk management system to confront the threat of tort liability caused by tra...
Incremental Improvement of Career Education in Utah. Final Report.
ERIC Educational Resources Information Center
Utah State Board of Education, Salt Lake City.
This is a project report on Utah's plans to effect "incremental improvements" in career education implementation in seven school districts. Project objectives are formulated as follow: effect incremental improvements in attendance area cones, strengthen career education leadership capabilities, develop staff competence to diffuse the…
Step by Step to Your New Camp Brochure.
ERIC Educational Resources Information Center
Cole, Bill
1993-01-01
Describes steps in developing camp brochures: examining brochures of competing camps; deciding on a message; hiring professional designers and photographers; writing the copy; determining marketing strategies and quantity of brochures needed; reviewing final photo choices; evaluating the brochure; and planning for brochure mailings. (LP)
Additional EIPC Study Analysis. Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadley, Stanton W; Gotham, Douglas J.; Luciani, Ralph L.
Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations weremore » developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 14 topics was developed for further analysis. This paper brings together the earlier interim reports of the first 13 topics plus one additional topic into a single final report.« less
Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter
NASA Astrophysics Data System (ADS)
Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico
2018-05-01
The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning infrastructure, processes and automation in order to support science planning of this scale throughout the TGO mission. We also detail how the re-use and further development of ESA's multi-mission planning software tool is being implemented in order to provide the necessary additional functionality for the SOC's planning team to exploit, and to therefore ensure the optimum scientific return of the TGO mission. Finally, we provide an overview and status of the real science planning activities taking place in the first weeks of the nominal science phase in the first half of 2018.
ERIC Educational Resources Information Center
Lanham, Frank W.
The purpose of this study was to explore the feasibility of utilizing the systems approach in developing an office occupations curriculum congruent with the concepts in the organic curriculum theory. The title of this project is New Office and Business Education Learning System (NOBELS). An analog system model was developed as the framework in…
ERIC Educational Resources Information Center
Diamond, Esther E.
The growing demand for program evaluation in the 1970s gave rise to a need for a comprehensive, carefully developed, objective set of guiding principles for the evaluation process, from initial planning to final report. The Joint Committee on Standards for Education Evaluation was established to meet this need. This broad-based group, representing…
Implementing WebQuest Based Instruction on Newton's Second Law
ERIC Educational Resources Information Center
Gokalp, Muhammed Sait; Sharma, Manjula; Johnston, Ian; Sharma, Mia
2013-01-01
The purpose of this study was to investigate how WebQuests can be used in physics classes for teaching specific concepts. The study had three stages. The first stage was to develop a WebQuest on Newton's second law. The second stage involved developing a lesson plan to implement the WebQuest in class. In the final stage, the WebQuest was…
ERIC Educational Resources Information Center
Gittman, Elizabeth; Gottlieb, Karen
Support for Innovative Teacher Projects was a 12-month program implemented by the Board of Cooperative Education Services (BOCES) of Nassau County, New York, designed to encourage and assist teachers in developing innovative projects in priority areas and in applying for funding. In collaboration with a university school of education, the project…
ERIC Educational Resources Information Center
Pew, Lou Ann
The document consists of a brief project report, copies of program publicity and related correspondence, and one of the nine learning packets developed for use in the program. The purpose of the project was to develop guidelines for planning, conducting, managing, and evaluating a simulation program for teaching the skills and competencies…
ERIC Educational Resources Information Center
DeVore, Paul W.
The background and objectives of the 1985-1986 Transportation Education Project of the Urban Mass Transportation Agency (UMTA) are discussed, along with project activities. The project was undertaken to transfer knowledge gained from federally-sponsored research and demonstrations to transit systems and to include the knowledge in college courses…
ERIC Educational Resources Information Center
Lescarbeau, Roland F.; And Others
This suggested curriculum guide represents the consensus of opinion by the representatives of seven schools comprising the Technical Education Consortium, with advice of industrial experts concerning the essential educational needs of the technicians they would employ. It will serve as a guide to schools planning to institute a program applicable…
NASA Technical Reports Server (NTRS)
Farah, Jeffrey J.
1992-01-01
Developing a robust, task level, error recovery and on-line planning architecture is an open research area. There is previously published work on both error recovery and on-line planning; however, none incorporates error recovery and on-line planning into one integrated platform. The integration of these two functionalities requires an architecture that possesses the following characteristics. The architecture must provide for the inclusion of new information without the destruction of existing information. The architecture must provide for the relating of pieces of information, old and new, to one another in a non-trivial rather than trivial manner (e.g., object one is related to object two under the following constraints, versus, yes, they are related; no, they are not related). Finally, the architecture must be not only a stand alone architecture, but also one that can be easily integrated as a supplement to some existing architecture. This thesis proposal addresses architectural development. Its intent is to integrate error recovery and on-line planning onto a single, integrated, multi-processor platform. This intelligent x-autonomous platform, called the Planning Coordinator, will be used initially to supplement existing x-autonomous systems and eventually replace them.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-02
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9690-9] Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast Air Quality Management... State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District...
2007-01-17
The Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) regulations regarding discontinuance of a health plan to include situations in which a health plan becomes incapacitated, either temporarily or permanently, as the result of a disaster.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...
Embedding ecosystem services in coastal planning leads to better outcomes for people and nature
Arkema, Katie K.; Verutes, Gregory M.; Wood, Spencer A.; Clarke-Samuels, Chantalle; Rosado, Samir; Canto, Maritza; Rosenthal, Amy; Ruckelshaus, Mary; Guannel, Gregory; Toft, Jodie; Faries, Joe; Silver, Jessica M.; Griffin, Robert; Guerry, Anne D.
2015-01-01
Recent calls for ocean planning envision informed management of social and ecological systems to sustain delivery of ecosystem services to people. However, until now, no coastal and marine planning process has applied an ecosystem-services framework to understand how human activities affect the flow of benefits, to create scenarios, and to design a management plan. We developed models that quantify services provided by corals, mangroves, and seagrasses. We used these models within an extensive engagement process to design a national spatial plan for Belize’s coastal zone. Through iteration of modeling and stakeholder engagement, we developed a preferred plan, currently under formal consideration by the Belizean government. Our results suggest that the preferred plan will lead to greater returns from coastal protection and tourism than outcomes from scenarios oriented toward achieving either conservation or development goals. The plan will also reduce impacts to coastal habitat and increase revenues from lobster fishing relative to current management. By accounting for spatial variation in the impacts of coastal and ocean activities on benefits that ecosystems provide to people, our models allowed stakeholders and policymakers to refine zones of human use. The final version of the preferred plan improved expected coastal protection by >25% and more than doubled the revenue from fishing, compared with earlier versions based on stakeholder preferences alone. Including outcomes in terms of ecosystem-service supply and value allowed for explicit consideration of multiple benefits from oceans and coasts that typically are evaluated separately in management decisions. PMID:26082545
Embedding ecosystem services in coastal planning leads to better outcomes for people and nature.
Arkema, Katie K; Verutes, Gregory M; Wood, Spencer A; Clarke-Samuels, Chantalle; Rosado, Samir; Canto, Maritza; Rosenthal, Amy; Ruckelshaus, Mary; Guannel, Gregory; Toft, Jodie; Faries, Joe; Silver, Jessica M; Griffin, Robert; Guerry, Anne D
2015-06-16
Recent calls for ocean planning envision informed management of social and ecological systems to sustain delivery of ecosystem services to people. However, until now, no coastal and marine planning process has applied an ecosystem-services framework to understand how human activities affect the flow of benefits, to create scenarios, and to design a management plan. We developed models that quantify services provided by corals, mangroves, and seagrasses. We used these models within an extensive engagement process to design a national spatial plan for Belize's coastal zone. Through iteration of modeling and stakeholder engagement, we developed a preferred plan, currently under formal consideration by the Belizean government. Our results suggest that the preferred plan will lead to greater returns from coastal protection and tourism than outcomes from scenarios oriented toward achieving either conservation or development goals. The plan will also reduce impacts to coastal habitat and increase revenues from lobster fishing relative to current management. By accounting for spatial variation in the impacts of coastal and ocean activities on benefits that ecosystems provide to people, our models allowed stakeholders and policymakers to refine zones of human use. The final version of the preferred plan improved expected coastal protection by >25% and more than doubled the revenue from fishing, compared with earlier versions based on stakeholder preferences alone. Including outcomes in terms of ecosystem-service supply and value allowed for explicit consideration of multiple benefits from oceans and coasts that typically are evaluated separately in management decisions.
Meyer, P.D.; Greenlee, Susan K.; Gesch, Dean B.; Hubl, Erik J.; Axmann, Ryan N.
2005-01-01
The Lincoln Lidar Project was a partnership developed between the U.S. Geological Survey National Center for Earth Resources Observations and Science (EROS), Lancaster County and the city of Lincoln, Nebraska. This project demonstrated a successful planning, collection, analysis and integration of high-resolution elevation information using Light Detection and Ranging, (Lidar) data. This report describes the partnership developed to collect local Lidar data and transform the data into information useable at local to national levels. This report specifically describes project planning, quality assurance, processing, transforming raw Lidar points to useable data layers, and visualizing and disseminating the raw and final products.
Life science payloads planning study. [for space shuttle orbiters and spacelab
NASA Technical Reports Server (NTRS)
Nelson, W. G.; Wells, G. W.
1977-01-01
Preferred approaches and procedures were defined for integrating the space shuttle life sciences payload from experiment solicitation through final data dissemination at mission completion. The payloads operations plan was refined and expended to include current information. The NASA-JSC facility accommodations were assessed, and modifications recommended to improve payload processing capability. Standard format worksheets were developed to permit rapid location of experiment requirements and a Spacelab mission handbook was developed to assist potential life sciences investigators at academic, industrial, health research, and NASA centers. Practical, cost effective methods were determined for accommodating various categories of live specimens during all mission phases.
Gregório, João; Cavaco, Afonso; Velez Lapão, Luís
2014-10-13
Health workforce planning is especially important in a setting of political, social, and economic uncertainty. Portuguese community pharmacists are experiencing such conditions as well as increasing patient empowerment, shortage of primary care physicians, and primary health care reforms. This study aims to design three future scenarios for Portuguese community pharmacists, recognizing the changing environment as an opportunity to develop the role that community pharmacists may play in the Portuguese health system. The community pharmacist scenario design followed a three-stage approach. The first stage comprised thinking of relevant questions to be addressed and definition of the scenarios horizon. The second stage comprised two face-to-face, scenario-building workshops, for which 10 experts from practice and academic settings were invited. Academic and professional experience was the main selection criteria. The first workshop was meant for context analysis and design of draft scenarios, while the second was aimed at scenario analysis and validation. The final scenarios were built merging workshops' information with data collected from scientific literature followed by team consensus. The final stage involved scenario development carried by the authors alone, developing the narratives behind each scenario. Analysis allowed the identification of critical factors expected to have particular influence in 2020 for Portuguese community pharmacists, leading to two critical uncertainties: the "Legislative environment" and "Ability to innovate and develop services". Three final scenarios were built, namely "Pharmacy-Mall", "e-Pharmacist", and "Reorganize or Die". These scenarios provide possible trends for market needs, pharmacist workforce numbers, and expected qualifications to be developed by future professionals. In all scenarios it is clear that the future advance of Portuguese community pharmacists will depend on pharmaceutical services provision beyond medicine dispensing. This innovative professional role will require the acquisition or development of competencies in the fields of management, leadership, marketing, information technologies, teamwork abilities, and behavioural and communication skills. To accomplish a sustainable evolution, legislative changes and adequate financial incentives will be beneficial. The scenario development proves to be valuable as a strategic planning tool, not only for understanding future community pharmacist needs in a complex and uncertain environment, but also for other health care professionals.
Principles of health infrastructure planning in less developed countries.
Unger, J P; Criel, B
1995-01-01
This article proposes a number of key principles for health infrastructure planning, based on a literature review on the one hand, and on a process of internal deduction on the other. The principles discussed are the following: an integrated health system; a thrifty planning of tiers within that health system; a specificity of tiers; a homogeneity of the tiers' structures; a minimum package of activities; a territorial responsibility and/or an explicit and discrete responsibility for a well-defined population; a necessary and sufficient population basis; a partial separation of administrative and public health planning bases; and, finally, rules for a geographical division and integration of non-governmental organizations. The definition of two strategies, primary health care and district health systems, is also revisited.
Resilience, integrated development and family planning: building long-term solutions.
De Souza, Roger-Mark
2014-05-01
For the many individuals and communities experiencing natural disasters and environmental degradation, building resilience means becoming more proficient at anticipating, preventing, recovering, and rebuilding following negative shocks and stresses. Development practitioners have been working to build this proficiency in vulnerable communities around the world for several decades. This article first examines the meaning of resilience as a component of responding to disasters and some of the key components of building resilience. It then summarises approaches to resilience developed by the Rockefeller and Packard Foundations, the Intergovernmental Panel on Climate Change, USAID and DFID, which show how family planning services can contribute to resilience. Next, it gives some examples of how family planning has been integrated into some current environment and development programmes. Finally, it describes how these integrated programmes have succeeded in helping communities to diversify livelihoods, bolster community engagement and resilience, build new governance structures, and position women as agents of change. Copyright © 2014 Reproductive Health Matters. Published by Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
... Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Withdrawal of direct final rule. SUMMARY... Particulate Matter and Ozone'' as a direct final rule on February 21, 2012. Because the EPA received adverse... Implementation Plans To Reduce Interstate Transport of Fine Particulate Matter and Ozone'' as a direct final rule...
Zhou, Wenliang; Yang, Xia; Deng, Lianbo
2014-01-01
Not only is the operating plan the basis of organizing marshalling station's operation, but it is also used to analyze in detail the capacity utilization of each facility in marshalling station. In this paper, a long-term operating plan is optimized mainly for capacity utilization analysis. Firstly, a model is developed to minimize railcars' average staying time with the constraints of minimum time intervals, marshalling track capacity, and so forth. Secondly, an algorithm is designed to solve this model based on genetic algorithm (GA) and simulation method. It divides the plan of whole planning horizon into many subplans, and optimizes them with GA one by one in order to obtain a satisfactory plan with less computing time. Finally, some numeric examples are constructed to analyze (1) the convergence of the algorithm, (2) the effect of some algorithm parameters, and (3) the influence of arrival train flow on the algorithm. PMID:25525614
Documenting Teacher Candidates' Professional Growth through Performance Evaluation
ERIC Educational Resources Information Center
Brown, Elizabeth Levine; Suh, Jennifer; Parsons, Seth A.; Parker, Audra K.; Ramirez, Erin M.
2015-01-01
In the United States, colleges of education are responding to demands for increased accountability. The purpose of this article is to describe one teacher education program's implementation of a performance evaluation tool during final internship that measures teacher candidates' development across four domains: Planning and Preparation,…
Final Report on the Multicultural/Diversity Assessment Project.
ERIC Educational Resources Information Center
Ambrosio, Anthony L.
The Emporia State University Multicultural/Diversity Project developed a set of assessment instruments and a model evaluation plan to assess multicultural/diversity (MCD) outcomes in teacher education and general education programs. Assessment instruments and techniques were constructed to evaluate the impact of coursework on student attitudes,…
DOT National Transportation Integrated Search
2016-08-11
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
A Blackboard-Based Dynamic Instructional Planner. ONR Final Report.
ERIC Educational Resources Information Center
Murray, William R.
Dynamic instructional planning was explored as a control mechanism for intelligent tutoring systems through the development of the Blackboard Instructional Planner--a blackboard software-based dynamic planner for computerized intelligent tutoring systems. The planner, designed to be generic to tutors teaching troubleshooting for complex physical…
Innovative resettlement schemes planned for the Numata Dam project
NASA Astrophysics Data System (ADS)
Nakayama, Mikiyasu
2003-10-01
The Numata Dam, planned for the Tone River basin of Gunma Prefecture, was the largest dam construction project ever considered in Japan. This dam construction project, however, did not materialize. The proposal for the Numata Dam was first launched in 1959, at a time when the Tokyo Metropolitan area was mushrooming, both in population and industrial activity. The Numata Dam was supposed to be a prioritized dam construction project to alleviate the then anticipated water shortage in the Tokyo Metropolitan area. The Numata Dam plan experienced fierce opposition from those who would have been obliged to resettle, whereas those in Tokyo and the surrounding metropolitan area welcomed the plan. The major concern of the planned Numata Dam was the number of resettlers, which was then estimated to be around 3000 families. The resettlement plan developed for the Numata Dam included some innovative concepts, which may be applicable even today, for dam construction projects in the developing world. The plan included such ideas as (a) having resettlers share existing farmland with the present owners provided improvements were made to increase productivity, (b) paying rent to resettlers, and (c) establishing the Tone River Development Agency. After more than a decade of debate, both at national and local levels, the Numata Dam project was finally discarded through a decision of the Prime Minister in 1972. The resettlement schemes elaborated for the Numata Dam still appear to be innovative. Such schemes may be applied to projects in the developing world, in particular, in nations that are about to take off with economic development. Copyright
Developing an evidence-based practice protocol: implications for midwifery practice.
Carr, K C
2000-01-01
Evidence-based practice is defined and its importance to midwifery practice is presented. Guidelines are provided for the development of an evidence-based practice protocol. These include: identifying the clinical question, obtaining the evidence, evaluating the validity and importance of the evidence, synthesizing the evidence and applying it to the development of a protocol or clinical algorithm, and, finally, developing an evaluation plan or measurement strategy to see if the new protocol is effective.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
... mining would occur directly beneath the lake itself and no surface mining would take place. East Lynn... Rockspring have approved mining and reclamation plans from the West Virginia Department of Environmental... plan purposes if leases were to be issued and mine plans approved. The Office of Surface Mining...
The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... on the Web site: http://stellwagen.noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number identified below. DATES: The final revised management plan is available to the public on June 17, 2010. FOR FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
... final operations plan, contract, and environmental assessment (EA), and the Final Regulatory Flexibility... fish in a given FY, it must submit an operations plan, sector contract, and EA to NMFS by September 1... National Environmental Policy Act (NEPA), an EA was prepared for each operations plan. All sector EAs are...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ouzounian, G.
2007-07-01
In 2005, new developments on radioactive-waste management in France were marked mostly by the preparation of the 2006 milestone specified in the act of 30 December 1991. A bill on radioactive waste management has been prepared by the Government at the beginning of 2006 and passed to the French Parliament on 15 June 2006. The Planning Act on the sustainable management of radioactive materials and wastes has been drawn from the results of the 15 years of research performed by ANDRA and the CEA on 'partitioning and transmutation of long-lived radionuclides', 'deep geological disposal' and 'conditioning and long term interimmore » storage'. Major milestones during those two last years are presented, including reviews of the Dossier 2005, official reports, the Public Debate, and finally the Planning Act. (authors)« less
Developing and testing new smoking measures for the Health Plan Employer Data and Information Set.
Pbert, Lori; Vuckovic, Nancy; Ockene, Judith K; Hollis, Jack F; Riedlinger, Karen
2003-04-01
To develop and test items for the Health Plan Employee Data and Information Set (HEDIS) that assess delivery of the full range of provider-delivered tobacco interventions. The authors identified potential items via literature review; items were reviewed by national experts. Face validity of candidate items was tested in focus groups. The final survey was sent to a random sample of 1711 adult primary care patients; the re-test survey was sent to self-identified smokers. The process identified reliable items to capture provider assessment of motivation and provision of assistance and follow-up. One can reliably assess patient self-report of provider delivery of the full range of brief tobacco interventions. Such assessment and feedback to health plans and providers may increase use of evidence-based brief interventions.
Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen
This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
2012-02-15
These regulations finalize, without change, interim final regulations authorizing the exemption of group health plans and group health insurance coverage sponsored by certain religious employers from having to cover certain preventive health services under provisions of the Patient Protection and Affordable Care Act.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... the availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS) for the South Unit of Badlands National Park, South Dakota. DATES: The Final GMP/EIS will remain available... Register by the Environmental Protection Agency. ADDRESSES: Copies of the GMP/EIS are available by request...
Development of k-300 concrete mix for earthquake-resistant Housing infrastructure in indonesia
NASA Astrophysics Data System (ADS)
Zulkarnain, Fahrizal
2018-03-01
In determining the strength of K-300 concrete mix that is suitable for earthquake-resistant housing infrastructure, it is necessary to research the materials to be used for proper quality and quantity so that the mixture can be directly applied to the resident’s housing, in the quake zone. In the first stage, the examination/sieve analysis of the fine aggregate or sand, and the sieve analysis of the coarse aggregate or gravel will be carried out on the provided sample weighing approximately 40 kilograms. Furthermore, the specific gravity and absorbance of aggregates, the examination of the sludge content of aggregates passing the sieve no. 200, and finally, examination of the weight of the aggregate content. In the second stage, the planned concrete mix by means of the Mix Design K-300 is suitable for use in Indonesia, with implementation steps: Planning of the cement water factor (CWF), Planning of concrete free water (Liters / m3), Planning of cement quantity, Planning of minimum cement content, Planning of adjusted cement water factor, Planning of estimated aggregate composition, Planning of estimated weight of concrete content, Calculation of composition of concrete mixture, Calculation of mixed correction for various water content. Implementation of the above tests also estimates the correction of moisture content and the need for materials of mixture in kilograms for the K-300 mixture, so that the slump inspection result will be achieved in planned 8-12 cm. In the final stage, a compressive strength test of the K-300 experimental mixture is carried out, and subsequently the composition of the K-300 concrete mixture suitable for one sack of cement of 50 kg is obtained for the foundation of the proper dwelling. The composition is consists of use of Cement, Sand, Gravel, and Water.
ERIC Educational Resources Information Center
Marvin, Chris; Nugent, Gwen; Doll, Beth
2006-01-01
Anecdotal information has recently suggested that families of infants and toddlers with disabilities in Nebraska were seeking early intervention services from providers not affiliated with the free, state-sanctioned "Early Development Network" and children's "Individualized Family Service Plans" (IFSPs). The purpose of this…
Biomass power for rural development. Technical progress report, July 1--September 30, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the third quarter of 1997, much of the Consortium`s effort has focused on outreach activities, continued feedstock development, fuel supply planning, and fuel contract development, and preparation for 1998 scale-up activities. The Consortium also submitted a Phase-1 extension proposal during this period. A few of the more important milestones are outlined below. The fourth quarter of 1997 is expected to be dominated by Phase-II proposal efforts and planning for 1998 activities.« less
Functional Limitations of Vocational Rehabilitation (VR) Consumers Final Report
ERIC Educational Resources Information Center
Overman, Beth; Schmidt-Davis, Holly
2006-01-01
In response to a request from the Rehabilitation Services Administration (RSA), the Research Triangle Institute (RTI) conducted a study to examine the feasibility of developing functional status measures for planning and implementing services to consumers in the State-Federal Vocational Rehabilitation (VR) Services Program. To investigate this…
FOOD PROCESSING TECHNOLOGY, A SUGGESTED 2-YEAR POST HIGH SCHOOL CURRICULUM.
ERIC Educational Resources Information Center
KNOEBEL, ROBERT M.; AND OTHERS
ADMINISTRATORS, ADVISORY COMMITTEES, SUPERVISORS, AND TEACHERS MAY USE THIS GUIDE IN PLANNING AND DEVELOPING NEW PROGRAMS OR EVALUATING EXISTING PROGRAMS IN POST-HIGH SCHOOL FOOD PROCESSING TECHNOLOGY. BASIC MATERIALS WERE PREPARED BY THE STATE UNIVERSITY OF NEW YORK AGRICULTURAL AND TECHNICAL COLLEGE AT MORRISVILLE AND FINAL PREPARATION WAS…
DOT National Transportation Integrated Search
2008-12-08
The objective of this research is to develop a general methodological framework for planning and : evaluating the effectiveness of highway reconstruction strategies on the systems performance : measures, in particular safety, mobility, and the tot...
DOT National Transportation Integrated Search
2015-12-01
This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...
Local Implementation of Performance-Based Curriculum. Final Report.
ERIC Educational Resources Information Center
Smalley, Shirley
An Indiana curriculum project involving the New Castle Area Vocational School and the Indiana Vocational Technical College Regions 6 and 8 addressed the need for establishing an articulation plan to provide for vertical movement of vocational students from secondary to postsecondary levels. Major objectives were (1) development and implementation…
76 FR 69707 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
... implementation of Ecosystem Based Fishery Management. A specific topic to be discussed will be the Council plan for moving forward with the development of ecosystem based fishery management approach in 2012. In... final topic to be discussed will be potential revisions to the Council's Statement of Organization...
Needs Assessment: Who Needs It?
ERIC Educational Resources Information Center
Hays, Donald G.; Linn, Joan K.
This monograph addresses the issue of needs assessment in the educational process and how it applies to the school counselor's role. The authors provide information on the process of needs assessment, from the initial step of obtaining commitment to the final outcome of improved program planning and development. Using an example common to many…
Building Enterprise Transition Plans Through the Development of Collapsing Design Structure Matrices
2015-09-17
processes from the earliest input to the final output to evaluate where change is needed to reduce costs, reduce waste, and improve the flow of information...from) integrating a large complex enterprise? • How should firms/enterprises evaluate systems prior to integration? What are some valid taxonomies
76 FR 66286 - Notice of Final 2010 Effluent Guidelines Program Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
... Coalbed Methane Extraction (CBM) industry and will develop pretreatments requirements for discharges of...) industry. EPA is also issuing the detailed study report for the Coalbed Methane Extraction and the... Methane Point Source Category: Detailed Study Report, EPA-820-R-10-022, DCN 09999; Draft Guidance Document...
Educational Planning for Utilization of Space Shuttle (ED-PLUSS). Final Research Report.
ERIC Educational Resources Information Center
Engle, Harry A.; Christensen, David L.
Possible educational uses of the proposed space-shuttle program of the National Aeronautics and Space Administration are outlined. Potential users of information developed by the project are identified and their characteristics analyzed. Other space-education programs operated by NASA are detailed. Proposals for a methodology for expanding…
Chicago Manufacturing Tech Prep. Fiscal Year 1991 Final Report.
ERIC Educational Resources Information Center
Chicago City Colleges, IL.
During its first year of development in 1991, the Chicago Manufacturing Technical Preparation (Tech Prep) Program established a plan for implementing an industry-driven, articulated 4-year manufacturing technology course of study that integrates applied academic courses with technical courses and meets industry hiring standards. The project…
Army Strategic Plan for Civilian Personnel Management Research: A Roadmap for the Future.
1986-10-01
Development Center. Ronen , Simcha , and Primps, Sophia (1980). "The impact of flextime on performance and attitudes in 25 public agencies," Pul" Personnel...net savings. Finally, Ronen and Primps (1980) survey of 25 public agencies showed that flex- time generally improved productivity through better
Evaluation of the Massachusetts Expanded Learning Time (ELT) Initiative: Final Study Findings
ERIC Educational Resources Information Center
Checkoway, Amy; Gamse, Beth; Velez, Melissa; Linkow, Tamara
2013-01-01
The Massachusetts Expanded Learning Time (ELT) initiative provides grants to selected schools to redesign their schedules by adding 300-plus instructional hours to the school year to improve outcomes, broaden enrichment opportunities, and provide teachers with more planning and professional development time. The Massachusetts Department of…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-16
... National Wildlife Refuge, 5364 County Road 115, Alturas, CA 96101. Local Library or Libraries: The documents are also available for review at the libraries listed under SUPPLEMENTARY INFORMATION. FOR MORE... management purposes, for migratory birds, for incidental fish and wildlife- oriented recreational development...
ERIC Educational Resources Information Center
Letmanyi, Helen
Developed to identify and qualitatively assess computer system evaluation techniques for use during acquisition of general purpose computer systems, this document presents several criteria for comparison and selection. An introduction discusses the automatic data processing (ADP) acquisition process and the need to plan for uncertainty through…
77 FR 42727 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
...: https://cdx.epa.gov . EIS No. 20120230, Draft EIS, USACE, CA, Sierra Vista Specific Plan Development... No. 20120232, Final EIS, RUS, MN, Hampton--Rochester--La Crosse Transmission System Improvement... Hampton, MN and La Crosse, WI, Review Period Ends: 08/20/2012, Contact: Stephanie A. Strength 202-720-0820...
Evaluation of the Occupational Training Information System (OTIS). Final Report.
ERIC Educational Resources Information Center
Macro Systems, Inc., Silver Spring, MD.
The Occupational Training Information System (OTIS), which is in operation in Oklahoma and in a developmental stage in Kentucky, was evaluated. The principle objective of OTIS is to provide the information necessary to formulate educational, manpower, and economic development plans and policies. OTIS consists primarily of a manpower demand…
Quality Control Study of the GSL Reinsurance System. Final Report.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
A quality control plan for the U.S. Department of Education's Guaranteed Student Loan (GSL) reinsurance process was developed. To identify existing errors, systems documentation and past analyses of the reinsurance system were analyzed, and interviews were conducted. Corrective actions were proposed, and a quality control checklist was developed…
Second Annual Career Guidance Institute: Final Report.
ERIC Educational Resources Information Center
Schenck, Norma Elaine
The document reports on the organization and implementation plans for Indiana's Second Annual Career Guidance Institute and the sound/slide programs developed on six career cluster areas. An extensive evaluation analyzes the Institute in light of its objectives, offers insights gained on career opportunities, gives changes in attitude regarding…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-28
..., and transportation service providers to identify their specific plans, investment strategies, and perspectives concerning market trends, which are a critical part of the subject Study. Finally, the Maritime... (or will be developed) to address the potential impacts on their costs and routing strategies as a...
GUIDELINES FOR TRAINING SITUATION ANALYSIS (TSA). FINAL REPORT.
ERIC Educational Resources Information Center
CHENZOFF, ANDREW P.; FOLLEY, JOHN D., JR.
THESE GUIDELINES REPRESENT A TEXTBOOK FOR INSTRUCTION IN THREE PHASES OF TRAINING SITUATION ANALYSIS (TSA), A STANDARDIZED PROCEDURE DEVELOPED BY THE NAVAL TRAINING DEVICE CENTER FOR SYSTEMATICALLY GATHERING AND INTERPRETING THE INFORMATION RELEVANT TO THE PLANNING OF TRAINING AND TRAINING DEVICES. THREE PHASES OF TSA ARE DESCRIBED IN…
Governance Final Briefing Paper
ERIC Educational Resources Information Center
Washington State Board of Education, 2011
2011-01-01
One of the State Board of Education's (SBE) strategic plan goals is to advocate for an effective, accountable governance structure for public education in Washington. The development of this goal comes from Board members' experiences over the last five years to understand and address the complexity of Washington's education system and their role…
DOT National Transportation Integrated Search
2014-12-01
The main objective of this project is to continue educating K-12 students about intermodal transportation. In 2012, NCITEC funded our K-12 project which aimed to develop tools, such as, lesson plans and hands-on activities that would introduce K-12 s...
Enhancing Literacy for Jobs and Productivity. Academy Final Report.
ERIC Educational Resources Information Center
Chynoweth, Judith K.
This document reports how the Council of State Policy and Planning Agencies (CSPA) Academy process helped nine states develop workplace literacy initiatives involving their governors' offices, the Job Training Partnership Act system, and the educational system. The states were Florida, Idaho, Massachusetts, Michigan, North Carolina, Tennessee,…
Science and Observation Recommendations for Future NASA Carbon Cycle Research
NASA Technical Reports Server (NTRS)
McClain, Charles R.; Collatz, G. J.; Kawa, S. R.; Gregg, W. W.; Gervin, J. C.; Abshire, J. B.; Andrews, A. E.; Behrenfeld, M. J.; Demaio, L. D.; Knox, R. G.
2002-01-01
Between October 2000 and June 2001, an Agency-wide planning, effort was organized by elements of NASA Goddard Space Flight Center (GSFC) to define future research and technology development activities. This planning effort was conducted at the request of the Associate Administrator of the Office of Earth Science (Code Y), Dr. Ghassem Asrar, at NASA Headquarters (HQ). The primary points of contact were Dr. Mary Cleave, Deputy Associate Administrator for Advanced Planning at NASA HQ (Headquarters) and Dr. Charles McClain of the Office of Global Carbon Studies (Code 970.2) at GSFC. During this period, GSFC hosted three workshops to define the science requirements and objectives, the observational and modeling requirements to meet the science objectives, the technology development requirements, and a cost plan for both the science program and new flight projects that will be needed for new observations beyond the present or currently planned. The plan definition process was very intensive as HQ required the final presentation package by mid-June 2001. This deadline was met and the recommendations were ultimately refined and folded into a broader program plan, which also included climate modeling, aerosol observations, and science computing technology development, for contributing to the President's Climate Change Research Initiative. This technical memorandum outlines the process and recommendations made for cross-cutting carbon cycle research as presented in June. A separate NASA document outlines the budget profiles or cost analyses conducted as part of the planning effort.
Development of Consensus Treatment Plans for Juvenile Localized Scleroderma
Li, Suzanne C.; Torok, Kathryn S.; Pope, Elena; Dedeoglu, Fatma; Hong, Sandy; Jacobe, Heidi T.; Rabinovich, C. Egla; Laxer, Ronald M.; Higgins, Gloria C.; Ferguson, Polly J.; Lasky, Andrew; Baszis, Kevin; Becker, Mara; Campillo, Sarah; Cartwright, Victoria; Cidon, Michael; Inman, Christi J; Jerath, Rita; O'Neil, Kathleen M.; Vora, Sheetal; Zeft, Andrew; Wallace, Carol A.; Ilowite, Norman T.; Fuhlbrigge, Robert C
2013-01-01
Objective To develop standardized treatment plans, clinical assessments, and response criteria for active, moderate to high severity juvenile localized scleroderma (jLS). Background jLS is a chronic inflammatory skin disorder associated with substantial morbidity and disability. Although a wide range of therapeutic strategies have been reported in the literature, a lack of agreement on treatment specifics and accepted methods for clinical assessment of have made it difficult to compare approaches and identify optimal therapy. Methods A core group of pediatric rheumatologists, dermatologists and a lay advisor was engaged by the Childhood Arthritis and Rheumatology Research Alliance (CARRA) to develop standardized treatment plans and assessment parameters for jLS using consensus methods/nominal group techniques. Recommendations were validated in two face-to-face conferences with a larger group of practitioners with expertise in jLS and with the full membership of CARRA, which encompasses the majority of pediatric rheumatologists in the U.S and Canada. Results Consensus was achieved on standardized treatment plans that reflect the prevailing treatment practices of CARRA members. Standardized clinical assessment methods and provisional treatment response criteria were also developed. Greater than 90% of pediatric rheumatologists responding to a survey (67% of CARRA membership) affirmed the final recommendations and agreed to utilize these consensus plans to treat patients with jLS. Conclusions Using consensus methodology, we have developed standardized treatment plans and assessment methods for jLS. The high level of support among pediatric rheumatologists will support future comparative effectiveness studies and enable the development of evidence-based guidelines for the treatment of jLS. PMID:22505322
Feasibility Study for Low Drag Acoustic Liners Final Report
NASA Technical Reports Server (NTRS)
Riedel, Brian; Wu, Jackie
2017-01-01
This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.
NASA Technical Reports Server (NTRS)
1974-01-01
The task phase concerned with the requirements, design, and planning studies for the carry-on laboratory (COL) began with a definition of biomedical research areas and candidate research equipment, and then went on to develop conceptual layouts for COL which were each evaluated in order to arrive at a final conceptual design. Each step in this design/evaluation process concerned itself with man/systems integration research and hardware, and life support and protective systems research and equipment selection. COL integration studies were also conducted and include attention to electrical power and data management requirements, operational considerations, and shuttle/Spacelab interface specifications. A COL program schedule was compiled, and a cost analysis was finalized which takes into account work breakdown, annual funding, and cost reduction guidelines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Latham, Brent
The purpose of the Cooperative Agreement was based on the mission the two agencies have in common. The Association of Village Council Presidents (AVCP) has been a critical player in accomplishing what Alaskan Native communities need since 1964 with various programs including energy assistance. The AVCP/DOE Partnership enabled AVCP to assist 10 of 56 remote Alaska Native villages in the development of a community-led Community Energy Plan. These plans have empowered the 10 Tribes to address their own energy development needs. The community energy plans that AVCP assisted the communities with identified the community’s energy vision, goals, and a highmore » level project timeline of each goal. The plans also include the technical potential, resource assessment, grant and technical assistance resources. The AVCP/DOE Partnership also enabled AVCP to provide tribal leaders and staff from the 56 Federally-Recognized Tribes with information about the policies and programs of the Department, support regional workshops and forums, and provide directed technical assistance for initial energy project support.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
... transportation opportunities would be sought to encourage visitors to come to Sand, Basswood, and Oak islands... light stations would be restored or rehabilitated, similar to the Raspberry Island light station. The...
Final Rule: Community Right-To-Know Reporting Requirements Federal Register Notice
Final reporting thresholds and threshold planning quantity (TPQ) for extremely hazardous substances (EHS) and non-EHS hazardous chemicals, required under Emergency Planning and Community Right-to-Know Act, Superfund Amendments and Reauthorization Act.
NASA Technical Reports Server (NTRS)
Bonet, John T.; Schellenger, Harvey G.; Rawdon, Blaine K.; Elmer, Kevin R.; Wakayama, Sean R.; Brown, Derrell L.; Guo, Yueping
2011-01-01
NASA has set demanding goals for technology developments to meet national needs to improve fuel efficiency concurrent with improving the environment to enable air transportation growth. A figure shows NASA's subsonic transport system metrics. The results of Boeing ERA N+2 Advanced Vehicle Concept Study show that the Blended Wing Body (BWB) vehicle, with ultra high bypass propulsion systems have the potential to meet the combined NASA ERA N+2 goals. This study had 3 main activities. 1) The development of an advanced vehicle concepts that can meet the NASA system level metrics. 2) Identification of key enabling technologies and the development of technology roadmaps and maturation plans. 3) The development of a subscale test vehicle that can demonstrate and mature the key enabling technologies needed to meet the NASA system level metrics. Technology maturation plans are presented and include key performance parameters and technical performance measures. The plans describe the risks that will be reduced with technology development and the expected progression of technical maturity.
Smith, Chris; Vannak, Uk; Sokhey, Ly; Ngo, Thoai D; Gold, Judy; Free, Caroline
2016-01-05
The objective of this paper is to outline the formative research process used to develop the MOTIF mobile phone-based (mHealth) intervention to support post-abortion family planning in Cambodia. The formative research process involved literature reviews, interviews and focus group discussions with clients, and consultation with clinicians and organisations implementing mHealth activities in Cambodia. This process led to the development of a conceptual framework and the intervention. Key findings from the formative research included identification of the main reasons for non-use of contraception and patterns of mobile phone use in Cambodia. We drew on components of existing interventions and behaviour change theory to develop a conceptual framework. A multi-faceted voice-based intervention was designed to address health concerns and other key determinants of contraception use. Formative research was essential in order to develop an appropriate mHealth intervention to support post-abortion contraception in Cambodia. Each component of the formative research contributed to the final intervention design.
Project Fever - Fostering Electric Vehicle Expansion in the Rockies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swalnick, Natalia
2013-06-30
Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unificationmore » and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.« less
Vulnerability-based evaluation of water supply design under climate change
NASA Astrophysics Data System (ADS)
Umit Taner, Mehmet; Ray, Patrick; Brown, Casey
2015-04-01
Long-lived water supply infrastructures are strategic investments in the developing world, serving the purpose of balancing water deficits compounded by both population growth and socio-economic development. Robust infrastructure design under climate change is compelling, and often addressed by focusing on the outcomes of climate model projections ('scenario-led' planning), or by identifying design options that are less vulnerable to a wide range of plausible futures ('vulnerability-based' planning). Decision-Scaling framework combines these two approaches by first applying a climate stress test on the system to explore vulnerabilities across many traces of the future, and then employing climate projections to inform the decision-making process. In this work, we develop decision scaling's nascent risk management concepts further, directing actions on vulnerabilities identified during the climate stress test. In the process, we present a new way to inform climate vulnerability space using climate projections, and demonstrate the use of multiple decision criteria to guide to a final design recommendation. The concepts are demonstrated for a water supply project in the Mombasa Province of Kenya, planned to provide domestic and irrigation supply. Six storage design capacities (from 40 to 140 million cubic meters) are explored through a stress test, under a large number climate traces representing both natural climate variability and plausible climate changes. Design outcomes are simulated over a 40-year planning period with a coupled hydrologic-water resources systems model and using standard reservoir operation rules. Resulting performance is expressed in terms of water supply reliability and economic efficiency. Ensemble climate projections are used for assigning conditional likelihoods to the climate traces using a statistical distance measure. The final design recommendations are presented and discussed for the decision criteria of expected regret, satisficing, and conditional value-at-risk (CVaR).
Code of Federal Regulations, 2013 CFR
2013-07-01
... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... complete retrofit construction of control devices, as specified in the final control plan, so that, if the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kabat, C; Cline, K; Li, Y
Purpose: With increasing numbers of cancer patients being diagnosed and the complexity of radiotherapy treatments rising it’s paramount that patient plan development continues to stay fluid within the clinic. In order to maintain a high standard of care and clinical efficiency the establishment of a tracking system for patient plan development allows healthcare providers to view real time plan progression and drive clinical workflow. In addition, it provides statistical datasets which can further identify inefficiencies within the clinic. Methods: An application was developed utilizing Microsoft’s ODBC SQL database engine to track patient plan status throughout the treatment planning process whilemore » also managing key factors pertaining to the patient’s treatment. Pertinent information is accessible to staff in many locations, including tracking monitors within dosimetry, the clinic network for both computers and handheld devices, and through email notifications. Plans are initiated with a CT and continually tracked through planning stages until final approval by staff. Patient’s status is dynamically updated by the physicians, dosimetrists, and medical physicists based on the stage of the patient’s plan. Results: Our application has been running over a six month period with all patients being processed through the system. Modifications have been made to allow for new features to be implemented along with additional tracking parameters. Based on in-house feedback, the application has been supportive in streamlining patient plans through the treatment planning process and data has been accumulating to further improve procedures within the clinic. Conclusion: Over time the clinic will continue to track data with this application. As data accumulates the clinic will be able to highlight inefficiencies within the workflow and adapt accordingly. We will add in new features to help support the treatment planning process in the future.« less
Baseband processor development/test performance for 30/20 GHz SS-TDMA communication system
NASA Technical Reports Server (NTRS)
Brown, L.; Sabourin, D.; Attwood, S.
1984-01-01
The baseband processor (BBP) development for the 30/20 GHz Satellite Communication System is described. The SS-TDMA concept for future satellite communications is reviewed, describing the overall system, the satellite payload, and the frequency plan. A brief general description of the BBP is given, and the proof-of-concept model of the BBP is summarized. Key technologies and custom LSI developed for the BBP are listed. Finally, key technology developments and test data are reported for the BBP.
1991-07-05
This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.
Very fast motion planning for highly dexterous-articulated robots
NASA Technical Reports Server (NTRS)
Challou, Daniel J.; Gini, Maria; Kumar, Vipin
1994-01-01
Due to the inherent danger of space exploration, the need for greater use of teleoperated and autonomous robotic systems in space-based applications has long been apparent. Autonomous and semi-autonomous robotic devices have been proposed for carrying out routine functions associated with scientific experiments aboard the shuttle and space station. Finally, research into the use of such devices for planetary exploration continues. To accomplish their assigned tasks, all such autonomous and semi-autonomous devices will require the ability to move themselves through space without hitting themselves or the objects which surround them. In space it is important to execute the necessary motions correctly when they are first attempted because repositioning is expensive in terms of both time and resources (e.g., fuel). Finally, such devices will have to function in a variety of different environments. Given these constraints, a means for fast motion planning to insure the correct movement of robotic devices would be ideal. Unfortunately, motion planning algorithms are rarely used in practice because of their computational complexity. Fast methods have been developed for detecting imminent collisions, but the more general problem of motion planning remains computationally intractable. However, in this paper we show how the use of multicomputers and appropriate parallel algorithms can substantially reduce the time required to synthesize paths for dexterous articulated robots with a large number of joints. We have developed a parallel formulation of the Randomized Path Planner proposed by Barraquand and Latombe. We have shown that our parallel formulation is capable of formulating plans in a few seconds or less on various parallel architectures including: the nCUBE2 multicomputer with up to 1024 processors (nCUBE2 is a registered trademark of the nCUBE corporation), and a network of workstations.
Final Approval of Arizona Air Plan Revision; Stationary Sources; New Source Review; Ammonia
EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning issuance of New Source Review (NSR) permits for stationary sources related to ammonia.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-04
... document is available on the internet at the NPS Planning, Environment, and Public Comment Web site at http.../EIS assesses impacts to soil resources, water quality, soundscapes, vegetation and wildlife...
NASA Technical Reports Server (NTRS)
Mclean, David R.; Tuchman, Alan; Potter, William J.
1991-01-01
Recently, many expert systems were developed in a LISP environment and then ported to the real world C environment before the final system is delivered. This situation may require that the entire system be completely rewritten in C and may actually result in a system which is put together as quickly as possible with little regard for maintainability and further evolution. With the introduction of high performance UNIX and X-windows based workstations, a great deal of the advantages of developing a first system in the LISP environment have become questionable. A C-based AI development effort is described which is based on a software tools approach with emphasis on reusability and maintainability of code. The discussion starts with simple examples of how list processing can easily be implemented in C and then proceeds to the implementations of frames and objects which use dynamic memory allocation. The implementation of procedures which use depth first search, constraint propagation, context switching and a blackboard-like simulation environment are described. Techniques for managing the complexity of C-based AI software are noted, especially the object-oriented techniques of data encapsulation and incremental development. Finally, all these concepts are put together by describing the components of planning software called the Planning And Resource Reasoning (PARR) shell. This shell was successfully utilized for scheduling services of the Tracking and Data Relay Satellite System for the Earth Radiation Budget Satellite since May 1987 and will be used for operations scheduling of the Explorer Platform in November 1991.
NASA Technical Reports Server (NTRS)
1995-01-01
NASA's Plan summarizes the Agency's vision, mission, and values. Specific goals are listed for each externally focused Enterprise: Mission to Planet Earth, Aeronautics, Human Exploration and Development of Space, Space Science, and Space Technology. These Enterprises satisfy the needs of customers external to NASA. The Strategic Functions (Space Communications, Human Resources, and Physical Resources) are necessary in order to meet the goals of the Enterprises. The goals of these Functions are also presented. All goals must be met while adhering to the discussed values and operating principles of NASA. A final section outlines the implementing strategy.
Nine steps towards a better water meter management.
Arregui, F J; Soriano, J; Cabrera, E; Cobacho, R
2012-01-01
The paper provides a comprehensive perspective of the critical aspects to be taken into account when planning the long-term management of water meters in a utility. In order to facilitate their quick understanding and practical implementation, they have been structured into nine steps. Ranging from an initial audit up to the final periodic meter replacement planning, these steps cover three aspects of the problem - field work, laboratory work and management tasks; and each one is developed in detail paying attention to the particular data needed and noting the practical outcome it will yield.
Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María del Carmen; Iriarte, Emma; Danel, Isabella; Donnay, France; Alemán, Denis; Serrano, Roselyn; Morales, Evelyn; Largaespada, Natalia; González, José Douglas Jarquín; Hernández, Ma Del Carmen; Mejía, Claudia E Quiroz; González, Geneva; Carrera, Yadira; Valverde, Clelia; Luna, Rufino; Valencia-Mendoza, Atanacio; Sosa-Rubí, Sandra G; Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María Del Carmen
2011-01-01
To present the main results of the regional situation diagnosis and intervention plan developed in 2010 as part of the planning activities of the Mesoamerican Health System by the Working Group on Maternal, Reproductive and Neonatal Health. A group of experts and representatives from countries in the region (Central America and nine southern Mexican states) conducted an exhaustive review of available data to construct a situational analysis and a review of effective practices for improving maternal, reproductive and neonatal health. Finally, the group proposed a regional action plan, defining regional goals and specific interventions. The situational diagnosis suggests that, although there has been progress in the last 10 years, maternal and neonatal mortality rates are still unnaceptably high in the region, with a substantial variability across countries. The group proposed as a regional goal the reduction of maternal and neonatal mortality in accordance with the Millenium Development Goals. The regional plan recommends specific maternal and neonatal health interventions emphasizing obstetric and neonatal emergency care, skilled birth attendance and family planning. The plan also includes a five year implementation strategy, along with training and evaluation strategies. The regional plan for maternal, neonatal and reproductive health has the potential to be successful, provided it is effectively implemented.
Chadderton, Chloe; Elliott, Eva; Hacking, Nick; Shepherd, Michael; Williams, Gareth
2013-12-01
This paper explores the use of health impact assessment (HIA) as a means of facilitating community engagement in spatial planning. The paper discusses the background to the development of HIA as a tool for assessing the likely impact of policies and wider changes on health with a view to building those into planning and decision-making, and describes the evolution of HIA into more participatory forms. It then goes on to describe a case-study of plans for a waste incinerator in an inner-city area in the UK, where HIA was used in response to community concerns about the development as a means of building in the views of local people to the decision-making around the plan. We describe in detail how the HIA was conducted and additional research undertaken within a timescale set by the planning processes. We discuss the difficulties involved in conducting any kind of research-based HIA so rapidly and in a situation of multiple, competing stakeholder interests. We argue that although the HIA failed to influence the final decisions in this particular instance it does, nonetheless, provide a model for how to create 'knowledge spaces' in which different perspectives and information can be brought around the table to create more democratic approaches to planning for waste.
Simulation Of Research And Development Projects
NASA Technical Reports Server (NTRS)
Miles, Ralph F.
1987-01-01
Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.
Next-generation Event Horizon Telescope developments: new stations for enhanced imaging
NASA Astrophysics Data System (ADS)
Palumbo, Daniel; Johnson, Michael; Doeleman, Sheperd; Chael, Andrew; Bouman, Katherine
2018-01-01
The Event Horizon Telescope (EHT) is a multinational Very Long Baseline Interferometry (VLBI) network of dishes joined to resolve general relativistic behavior near a supermassive black hole. The imaging quality of the EHT is largely dependent upon the sensitivity and spatial frequency coverage of the many baselines between its constituent telescopes. The EHT already contains many highly sensitive dishes, including the crucial Atacama Large Millimeter/Submillimeter Array (ALMA), making it viable to add smaller, cheaper telescopes to the array, greatly improving future capabilities of the EHT. We develop tools for optimizing the positions of new dishes in planned arrays. We also explore the feasibility of adding small orbiting dishes to the EHT, and develop orbital optimization tools for space-based VLBI imaging. Unlike the Millimetron mission planned to be at L2, we specifically treat near-earth orbiters, and find rapid filling of spatial frequency coverage across a large range of baseline lengths. Finally, we demonstrate significant improvement in image quality when adding small dishes to planned arrays in simulated observations.
On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process
NASA Astrophysics Data System (ADS)
Hongzhi, Zhao; Jian, Zhang
2018-03-01
The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.
DE-EE0006714 Final Report-Project Icebreaker™
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, Lorry; Karpinski, David; Nagusky, Beth
Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less
DOT National Transportation Integrated Search
2003-10-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...
ERIC Educational Resources Information Center
1972
Health and communications experts from Taiwan, South Korea, Malaysia, Philippines, Singapore and South Vietnam met in Manila for two weeks of workshop sessions to discuss communication strategies and to develop educational materials for the promotion of family health. The overall aim of the workshop was to encourage the production of educational…
ERIC Educational Resources Information Center
Harrington, Mary
The Free to Grow pilot project, developed by the Charles R. Drew University of Medicine and Science and its Head Start project, operated between 1994 and 1999. Following a 2-year planning and development stage, 5 project sites went on to complete the 3-year implementation phase in California, Colorado, Kentucky, New York, and Puerto Rico; the…
Test Plan Development for Plastic Ammunition Containers. Volume 1
1989-03-15
1850 Black Canyon Stage¶I Packaging division (SMCAR-AEP) Picatinny Phoenix, Arizona 85027 Arsenal, New Jersey 07806-5000 86. NAME OF FUNDING...packaging containers. The report is presented in two separate volumes. Volume I contains the Final Technical Report and includes the analysis of... Division of the U.S. Army Armament Research, Development and Engineering Center. Mr. Jasper C. Griggs and Mr. D. E. Jones served as technical consultants
Case study: Lockheed-Georgia Company integrated design process
NASA Technical Reports Server (NTRS)
Waldrop, C. T.
1980-01-01
A case study of the development of an Integrated Design Process is presented. The approach taken in preparing for the development of an integrated design process includes some of the IPAD approaches such as developing a Design Process Model, cataloging Technical Program Elements (TPE's), and examining data characteristics and interfaces between contiguous TPE's. The implementation plan is based on an incremental development of capabilities over a period of time with each step directed toward, and consistent with, the final architecture of a total integrated system. Because of time schedules and different computer hardware, this system will not be the same as the final IPAD release; however, many IPAD concepts will no doubt prove applicable as the best approach. Full advantage will be taken of the IPAD development experience. A scenario that could be typical for many companies, even outside the aerospace industry, in developing an integrated design process for an IPAD-type environment is represented.
SU-F-J-110: MRI-Guided Single-Session Simulation, Online Adaptation, and Treatment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hill, P; Geurts, M; Mittauer, K
Purpose: To develop a combined simulation and treatment workflow for MRI-guided radiation therapy using the ViewRay treatment planning and delivery system. Methods: Several features of the ViewRay MRIdian planning and treatment workflows are used to simulate and treat patients that require emergent radiotherapy. A simple “pre-plan” is created on diagnostic imaging retrieved from radiology PACS, where conformal fields are created to target a volume defined by a physician based on review of the diagnostic images and chart notes. After initial consult in radiation oncology, the patient is brought to the treatment room, immobilized, and imaged in treatment position with amore » volumetric MR. While the patient rests on the table, the pre-plan is applied to the treatment planning MR and dose is calculated in the treatment geometry. After physician review, modification of the plan may include updating the target definition, redefining fields, or re-balancing beam weights. Once an acceptable treatment plan is finalized and approved, the patient is treated. Results: Careful preparation and judicious choices in the online planning process allow conformal treatment plans to be created and delivered in a single, thirty-minute session. Several advantages have been identified using this process as compared to conventional urgent CT simulation and delivery. Efficiency gains are notable, as physicians appreciate the predictable time commitment and patient waiting time for treatment is decreased. MR guidance in a treatment position offers both enhanced contrast for target delineation and reduction of setup uncertainties. The MRIdian system tools designed for adaptive radiotherapy are particularly useful, enabling plan changes to be made in minutes. Finally, the resulting plans, typically 6 conformal beams, are delivered as quickly as more conventional AP/PA beam arrangements with comparatively superior dose distributions. Conclusion: The ViewRay treatment planning software and delivery system can accommodate a fast simulation and treatment workflow.« less
Decommissioning strategy for liquid low-level radioactive waste surface storage water reservoir.
Utkin, S S; Linge, I I
2016-11-22
The Techa Cascade of water reservoirs (TCR) is one of the most environmentally challenging facilities resulted from FSUE "PA "Mayak" operations. Its reservoirs hold over 360 mln m 3 of liquid radioactive waste with a total activity of some 5 × 10 15 Bq. A set of actions implemented under a special State program involving the development of a strategic plan aimed at complete elimination of TCR challenges (Strategic Master-Plan for the Techa Cascade of water reservoirs) resulted in considerable reduction of potential hazards associated with this facility. The paper summarizes the key elements of this master-plan: defining TCR final state, feasibility study of the main strategies aimed at its attainment, evaluation of relevant long-term decommissioning strategy, development of computational tools enabling the long-term forecast of TCR behavior depending on various engineering solutions and different weather conditions. Copyright © 2016 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Źróbek-Różańska, Alina; Zysk, Elżbieta; Źróbek, Ryszard
2017-10-01
Poland has experienced many political, legal, social and economic transformations. For the last twelve decades, this country was under foreign partition, in the war, under the influence of socialist system with centrally planned economy and finally regained autonomy and rapidly introduced market economy. Each epoch had its own characteristic, that can be recognized also in the residential buildings development. Therefore, the authors focused on the social, economic, legal and planning conditionings that shaped the development of the residential buildings with the most characteristic periods: pre-II world war, 50-ties, 60-ties, 70-ties, 80-ties, 90-ties and XXI century. Some of them are visible in the still existing residential buildings, especially in the suburban villages. The most recent process that can be observed in the study area is urban sprawl. Since the beginning of the XXI century, urban population in Poland has been gradually declining, while suburban villages transform into ‘urban-like’ districts. The aim of the study was to arrange and present in the decade-by-decade manner, the social, economic, legal and planning conditionings that were valid in particular periods. It was realized by correlating information on the contemporary social trends, economic conditions, legal framework and planning regulations. Presentation was enriched by the examples of the buildings developed in the accordance with the contemporary restrictions.
Market analysis and program for use for energy conservation manuals: a marketing plan. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-02-25
The FEA, with a mission to analyze total national energy usage, formulate policy, and stimulate actions that will increase domestic energy supply and decrease energy demand, decided to develop effective energy conservation manuals for decision makers in existing buildings. The manuals developed are: Building Owner's and Manager's Guide to Energy Conservation; Building Operator's Guide to Energy Conservation; and Architect's and Engineer's Guide to Energy Conservation. The background and scope of the entire project which led to the development of the manuals is discussed in the introduction of this publication. Part II, Market Analysis, provides insight into the character of themore » designated audiences for the manuals. Part III, Program for Use, is a marketing and promotion plan for the manuals.« less
Photodynamic therapy in neurosurgery: a proof of concept of treatment planning system
NASA Astrophysics Data System (ADS)
Dupont, C.; Reyns, N.; Mordon, S.; Vermandel, M.
2017-02-01
Glioblastoma (GBM) is the most common primary brain tumor. PhotoDynamic Therapy (PDT) appears as an interesting research field to improve GBM treatment. Nevertheless, PDT cannot fit into the current therapeutic modalities according to several reasons: the lack of reliable and reproducible therapy schemes (devices, light delivery system), the lack of consensus on a photosensitizer and the absence of randomized and controlled multicenter clinical trial. The main objective of this study is to bring a common support for PDT planning. Here, we describe a proof of concept of Treatment Planning System (TPS) dedicated to interstitial PDT for GBM treatment. The TPS was developed with the integrated development environment C++ Builder XE8 and the environment ArtiMED, developed in our laboratory. This software enables stereotactic registration of DICOM images, light sources insertion and an accelerated CUDA GPU dosimetry modeling. Although, Monte-Carlo is more robust to describe light diffusion in biological tissue, analytical model accelerated by GPU remains relevant for dose preview or fast reverse planning processes. Finally, this preliminary work proposes a new tool to plan interstitial or intraoperative PDT treatment and might be included in the design of future clinical trials in order to deliver PDT straightforwardly and homogenously in investigator centers.
Curriculum Planning for Oral and Maxillofacial Surgery Assistant Program. Final Report.
ERIC Educational Resources Information Center
Taylor, Mary Ann
This project was conducted to develop a curriculum for dental auxiliary training in the dental specialty field of oral and maxillofacial surgery. Research was conducted to identify the major functions performed by an oral surgery assistant and then to organize these functions into an educational program that would provide adequate didactic and…
Planning a Tech Prep Program in Hospitality. Final Report.
ERIC Educational Resources Information Center
Chicago City Colleges, IL. Chicago City-Wide Coll.
A project conducted to establish tech prep articulation training agreements between City Colleges of Chicago and several public secondary schools is described in this report. Project activities were as follows: (1) developed a handbook to define the tech prep experience and guide committee members on how tech prep can be a valuable asset to…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-21
... the development of policies, procedures, rules, and regulations and other planning activities of the... holding companies and foreign banking organizations; the interim final rule applies to nonbank financial... determination date. Foreign banking organizations that have eligible assets of $50 billion or more will be...
National Center for Education Statistics "Product Planning and Development." Final Report.
ERIC Educational Resources Information Center
User Technology Associates, Inc.
To assist in its mission of providing information in the most timely manner, the National Center for Education Statistics (NCES) contracted for a study of current modes of information dissemination to its user population that would also identify new and emerging technologies for information dissemination. The project is divided into three phases…
DOT National Transportation Integrated Search
2004-11-01
In 1999, the Treasure Valley area of the State of Idaho received a federal earmark of $441,470 to develop an Incident Management Plan for the Treasure Valley and to design/deploy Intelligent Transportation Systems (ITS) devices for Interstates 84 and...
California "Right-to-Read" Invervention Model. Final Report.
ERIC Educational Resources Information Center
McElligott, Joseph P., Jr.
A summer research project in the teaching of reading to inner-city children through the utilization of Catholic school personnel as volunteer workers is described. Chapter 1 describes the origin and development of the project--a statement of its purpose, a proposal requesting Federal aid, establishment of criteria for selecting students, plans for…
76 FR 46083 - Secondary National Ambient Air Quality Standards for Oxides of Nitrogen and Sulfur
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-01
...-1145, by one of the following methods: http://www.regulations.gov : Follow the on-line instructions for..., Research Triangle Park, NC 27711; telephone: 919- 541-4650; fax: 919-541-2357; e-mail: [email protected] Complementary Areas of Research Implementation Challenges 5. Final Monitoring Plan Development and Stakeholder...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-14
... National Wildlife Refuge System (NWRS), consistent with sound principles of fish and wildlife management, conservation, legal mandates, and Service policies. In addition to outlining broad management direction on... purposes. We use these purposes as the foundation for developing and prioritizing the management goals and...
North Dakota Statewide Nursing Study, Phase III. Final Report and Recommendations.
ERIC Educational Resources Information Center
Clark, Neil; Smith, David
The process, outcomes, and recommendations resulting from a project to develop a statewide nursing resource planning system are examined. Phase 1 of the project investigated nursing manpower demands for 1984 and 1986, while phase 2 studied the current scope of nursing practice. In addition to summarizing the findings of these investigations,…
Vocational Determination Process through School, Industry and Community Involvement. Final Report.
ERIC Educational Resources Information Center
Lutz, John; Staber, Richard A.
Through a school-industry-community council strategies and procedures were developed and tested to identify the most cost effective method to provide selected students with opportunities for nontraditional counseling training and to determine the effect it had on career goal choices. The American College Testing (ACT) Career Planning Program test…
ERIC Educational Resources Information Center
Needham, Raymond; Binnie, Arthur
Participants representing 18 western states and 37 cities attended an inservice institute designed to (1) identify trends, (2) examine current innovative programs, (3) look at roadblock programs, and (4) develop impact plans to cause improvement in occupational programs in the participants' home cities and states. Participants, including…
Instructional Materials in Spanish for Agriculture. Final Report.
ERIC Educational Resources Information Center
Mainous, Bruce H.
A federally funded project to develop Spanish for Agricultural Purposes, a set of instructional materials for agricultural specialists planning to work in Latin America, is reported. The materials are intended for use by individuals with at least a year's college-level study of Spanish. They include: a series of authentic readings, each with an…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-06
... Refuge System Improvement Act of 1997, requires us to develop a CCP for each national wildlife refuge... of historical regimes, soil types and elevation, and the current hydrological system. Management... published under the authority of the National Wildlife Refuge System Improvement Act of 1997, Public Law 105...
A Bibliography of the Literature on Optical Storage Technology. Final Report.
ERIC Educational Resources Information Center
Park, James R.
Compiled to serve as a working tool for those involved in optical storage research, planning, and development, this bibliography contains nearly 700 references related to the optical storage and retrieval of digital computer data. Citations are divided into two major groups covering the general and patent literatures. Each citation includes the…
Outdoor Education, Junior Biology Field Studies.
ERIC Educational Resources Information Center
Aikman, John H.; And Others
Field studies for grade nine and ten biology students are developed in this teacher and student guide for outdoor education. A small section is devoted to teacher pre-planning and final sections are concerned with equipment, audio-visual resources, and a large booklist. Twenty-three investigations related to earth science and biology topics are…
"Project Outreach," Final Report, December 31, 1979.
ERIC Educational Resources Information Center
Latzer, Robert M.
Fall 1979 activities for Project Outreach, a faculty development program at Jersey City State College, are described. Problems involved in carrying out these activities, a statement of expenditures and balances, and a set of recommendations are covered. Four areas of activity planned at the college were: a second series of study skills seminars, a…
DOT National Transportation Integrated Search
1997-06-18
The primary goals of the Buffalo/Niagara Falls Intelligent Transportation System (ITS) study are to evaluate the transportation needs of the region, assess the ability of ITS to meet those needs and develop a Strategic Plan for ITS implementation.
Wind Powering America State Outreach. Final Technical Report: Washington State
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stearns, Tim
2013-09-30
The Washington Department of Commerce, via a U.S. Department of Energy grant, supported research into siting and permitting processes for wind projects by Skagit County, Washington. The goal was to help a local government understand key issues, consider how other areas have addressed wind siting, and establish a basis for enacting permitting and zoning ordinances that provided a more predictable permitting path and process for landowners, citizens, government and developers of small and community wind projects. The County?s contractor developed a report that looked at various approaches to wind siting, interviewed stakeholders, and examined technology options. The contractor outlined keymore » issues and recommended the adoption of a siting process. The Skagit County Commission considered the report and directed the Skagit County Planning & Development Services Department to add development of wind guidelines to its work plan for potential changes to development codes.« less
Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Fisichelli, Nicholas A.; Schuurman, Gregor W.; Symstad, Amy J.; Ray, Andrea; Miller, Brian; Cross, Molly; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the southwest South Dakota grasslands focal area, with an emphasis on Badlands National Park and Buffalo Gap National Grassland. The report explains scenario planning as an adaptation tool in general, then describes how it was applied to the focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held January 20-21, 2016 in Rapid City, South Dakota, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Legal Briefing: Medicare Coverage of Advance Care Planning.
Pope, Thaddeus Mason
2015-01-01
This issue's "Legal Briefing" column covers the recent decision by the Centers for Medicare and Medicaid Services (CMS) to expand Medicare coverage of advance care planning, beginning 1 January 2016. Since 2009, most "Legal Briefings" in this journal have covered a wide gamut of judicial, legislative, and regulatory developments concerning a particular topic in clinical ethics. In contrast, this "Legal Briefing" is more narrowly focused on one single legal development. This concentration on Medicare coverage of advance care planning seems warranted. Advance care planning is a frequent subject of articles in JCE. After all, it has long been seen as an important, albeit only partial, solution to a significant range of big problems in clinical ethics. These problems range from medical futility disputes to decision making for incapacitated patients who have no available legally authorized surrogate. Consequently, expanded Medicare coverage of advance care planning is a potentially seismic development. It may materially reduce both the frequency and severity of key problems in clinical ethics. Since the sociological, medical, and ethical literature on advance care planning is voluminous, I will not even summarize it here. Instead, I focus on Medicare coverage. I proceed, chronologically, in six stages: 1. Prior Medicare Coverage of Advance Care Planning 2. Proposed Expanded Medicare Coverage in 2015 3. Proposed Expanded Medicare Coverage in 2016 4. The Final Rule Expanding Medicare Coverage in 2016 5. Remaining Issues for CMS to Address in 2017 6. Pending Federal Legislation. Copyright 2015 The Journal of Clinical Ethics. All rights reserved.
75 FR 4417 - Wind Cave National Park, Custer County, SD
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... DEPARTMENT OF THE INTERIOR Wind Cave National Park, Custer County, SD AGENCY: National Park... Final Environmental Impact Statement, Wind Cave National Park, Custer County, South Dakota. SUMMARY... Management Plan and Final Environmental Impact Statement (Plan), Wind Cave National Park, Custer County...
DOT National Transportation Integrated Search
2004-01-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...
DOT National Transportation Integrated Search
2003-09-16
The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...
WastePlan model implementation for New York State. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Visalli, J.R.; Blackman, D.A.
1995-07-01
WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992more » to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacFarlane, Michael; Battista, Jerry; Chen, Jeff
Purpose: To develop a radiotherapy dose tracking and plan evaluation technique using cone-beam computed tomography (CBCT) images. Methods: We developed a patient-specific method of calibrating CBCT image sets for dose calculation. The planning CT was first registered with the CBCT using deformable image registration (DIR). A scatter plot was generated between the CT numbers of the planning CT and CBCT for each slice. The CBCT calibration curve was obtained by least-square fitting of the data, and applied to each CBCT slice. The calibrated CBCT was then merged with original planning CT to extend the small field of view of CBCT.more » Finally, the treatment plan was copied to the merged CT for dose tracking and plan evaluation. The proposed patient-specific calibration method was also compared to two methods proposed in literature. To evaluate the accuracy of each technique, 15 head-and-neck patients requiring plan adaptation were arbitrarily selected from our institution. The original plan was calculated on each method’s data set, including a second planning CT acquired within 48 hours of the CBCT (serving as gold standard). Clinically relevant dose metrics and 3D gamma analysis of dose distributions were compared between the different techniques. Results: Compared to the gold standard of using planning CTs, the patient-specific CBCT calibration method was shown to provide promising results with gamma pass rates above 95% and average dose metric agreement within 2.5%. Conclusions: The patient-specific CBCT calibration method could potentially be used for on-line dose tracking and plan evaluation, without requiring a re-planning CT session.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2003-08-06
This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less
Li, Suzanne C; Torok, Kathryn S; Pope, Elena; Dedeoglu, Fatma; Hong, Sandy; Jacobe, Heidi T; Rabinovich, C Egla; Laxer, Ronald M; Higgins, Gloria C; Ferguson, Polly J; Lasky, Andrew; Baszis, Kevin; Becker, Mara; Campillo, Sarah; Cartwright, Victoria; Cidon, Michael; Inman, Christi J; Jerath, Rita; O'Neil, Kathleen M; Vora, Sheetal; Zeft, Andrew; Wallace, Carol A; Ilowite, Norman T; Fuhlbrigge, Robert C
2012-08-01
Juvenile localized scleroderma (LS) is a chronic inflammatory skin disorder associated with substantial morbidity and disability. Although a wide range of therapeutic strategies has been reported in the literature, a lack of agreement on treatment specifics and accepted methods for clinical assessment has made it difficult to compare approaches and identify optimal therapy. Our objective was to develop standardized treatment plans, clinical assessments, and response criteria for active, moderate to high severity juvenile LS. A core group of pediatric rheumatologists, dermatologists, and a lay advisor was engaged by the Childhood Arthritis and Rheumatology Research Alliance (CARRA) to develop standardized treatment plans and assessment parameters for juvenile LS using consensus methods/nominal group techniques. Recommendations were validated in 2 face-to-face conferences with a larger group of practitioners with expertise in juvenile LS and with the full membership of CARRA, which encompasses the majority of pediatric rheumatologists in the US and Canada. Consensus was achieved on standardized treatment plans that reflect the prevailing treatment practices of CARRA members. Standardized clinical assessment methods and provisional treatment response criteria were also developed. Greater than 90% of pediatric rheumatologists responding to a survey (66% of CARRA membership) affirmed the final recommendations and agreed to utilize these consensus plans to treat patients with juvenile LS. Using consensus methodology, we have developed standardized treatment plans and assessment methods for juvenile LS. The high level of support among pediatric rheumatologists will support future comparative effectiveness studies and enable the development of evidence-based guidelines for the treatment of juvenile LS. Copyright © 2012 by the American College of Rheumatology.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-17
...This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.
ERIC Educational Resources Information Center
California Univ., Los Angeles. Graduate School of Library and Information Science.
This final report on a project at the University of California at Los Angeles (UCLA) on strategic planning for libraries and information resources in the research university begins with an introductory section on levels of consideration in planning; issues of current concern (effects of technology, economics of libraries, changes in the academic…
Hawaii State Plan for Occupational Safety and Health. Final rule.
2012-09-21
This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.
Cost and Schedule Analytical Techniques Development
NASA Technical Reports Server (NTRS)
1996-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.
2007-12-05
This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.
Developing the 2012 national action plan for protecting children in agriculture.
Lee, Barbara C; Gallagher, Susan S; Liebman, Amy K; Miller, Mary E; Marlenga, Barbara
2012-01-01
In 1996 the US launched a National Childhood Agricultural Injury Prevention Initiative, guided by an action plan generated by a 42-member multidisciplinary committee. A major update to the plan was released following the 2001 Summit on Childhood Agricultural Injury Prevention. From the year 2010 through 2011 a comprehensive assessment of progress to date was conducted followed by the drafting, review and finalizing of a new action plan-"The 2012 Blueprint for Protecting Children in Agriculture." This paper briefly describes the purpose and process for generating the new action plan then provides a listing of the 7 goals and 26 strategies within the plan. These goals and strategies account for trends in childhood agricultural injuries, changes in agricultural production and the demographics of its workforce, effectiveness of interventions, and the increasing use of social media, marketing and social networking. Primary funding for this project was provided by the National Institute for Occupational Safety and Health (NIOSH), which continues to serve as the lead federal agency for the national initiative.
Situation analysis: assessing family planning and reproductive health services. Quality of care.
1997-01-01
This issue of Population Briefs contains articles on researches conducted by the Population Council concerning the delivery of quality of care, contraceptive development, safe abortion, family planning, demography, and medical anthropology. The cover story focuses on a systematic data collection tool called Situation Analysis that helps managers in program evaluation. This tool has a handbook entitled "The Situation Analysis Approach to Assessing Family Planning and Reproductive Health Services" that contains all the information needed to conduct a Situation Analysis study. The second article reports about a new contraceptive method, the two-rod levonorgestrel, which was developed at the Population Council and was recently approved by the US Food and Drug Administration. The third article reports on a medical abortion procedure that was proven to be safe, effective, and acceptable to women in developing countries. Moreover, the fourth article presents initial findings of the Community Health and Family Planning Project conducted in Northern Ghana. The fifth article discusses the paper written by the Population Council demographer, Mark Montgomery entitled "Learning and lags in mortality perceptions". Finally, the sixth article deals with another paper that reports on women's health perceptions and reproductive health in the Middle East.
Transportation planning performance measures : final report.
DOT National Transportation Integrated Search
2005-10-01
Oregon transportation plans, including the statewide Oregon Transportation Plan, and current regional transportation plans for the Portland, Salem, Eugene, and Medford metropolitan areas, contain some policy areas that are not adequately addressed by...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
...) Federal joint lead agencies, and the State of California Department of Fish and Game (DFG), acting as the..., Preservation, and Restoration Plan (SMP) Final EIS/EIR. The SMP is a comprehensive plan designed to address the...
EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning emissions of lead-bearing fugitive dust associated with the primary copper smelter located in Hayden, Arizona.
77 FR 38801 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... Resource Management (VRM) Plan, Amendment, Class Designation, Carbon County, WY, Review Period Ends: 07/30... Final Vehicle Management Plan, Implementation, Denali National Park and Preserve, AK, Review Period Ends.... EIS No. 20120199, Final EIS, RUS, MS, ADOPTION--Kemper County Integrated Gasification Combined Cycle...
ERIC Educational Resources Information Center
Starch Inra Hooper, Inc., Mamaroneck, NY.
A pilot mass media campaign was conducted in New Haven, Connecticut, to acquaint the public with the concept of career education. For three weeks newspapers, television, and radio devoted time and space to the campaign which focused on one of the following topics each week: the need for planning in career development; career development; career…
The influences of implementing state-mandated science assessment on teacher practice
NASA Astrophysics Data System (ADS)
Katzmann, Jason Matthew
Four high school Biology teachers, two novice and two experienced, participated in a year and a half case study. By utilizing a naturalistic paradigm, the four individuals were studied in their natural environment, their classrooms. Data sources included: three semi-structured interviews, classroom observation field notes, and classroom artifacts. Through cross-case analysis and a constant comparative methodology, coding nodes where combined and refined resulting in the final themes for discussion. The following research question was investigated: what is the impact of high-stakes testing on high school Biology teacher's instructional planning, instructional practices and classroom assessments? Seven final themes were realized: Assessment, CSAP, Planning, Pressure, Standards, Teaching and Time. Each theme was developed and discussed utilizing each participant's voice. Trustworthiness of this study was established via five avenues: triangulation of data sources, credibility, transferability, dependability and confirmability. A model of the influences of high-stakes testing on teacher practice was developed to describe the seven themes (Figure 5). This model serves as an illustration of the complex nature of teacher practice and the influences upon it. The four participants in this study were influenced by high-stakes assessment. It influenced their instructional decisions, assessment practices, use of time, planning decisions and decreased the amount of inquiry that occurred in the classroom. Implications of this research and future research directions are described.
NASA Technical Reports Server (NTRS)
Adair, Jerry R.
1994-01-01
This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.
SmartStaff: A Support Concept for Staff Planning
2000-11-01
facilitated time management and decreased the ambiguities of the plans presented. However, the quality of the final plan did not improve. Team decision making, Team Planning, Group Support Systems, Task Group Staff
Ecology of Greater Sage-Grouse in the Bi-State Planning Area Final Report, September 2007
Casazza, Michael L.; Overton, Cory T.; Farinha, Melissa A.; Torregrosa, Alicia; Fleskes, Joseph P.; Miller, Michael R.; Sedinger, James S.; Kolada, Eric J.
2009-01-01
Conservation efforts for greater sage-grouse (Centrocercus urophasianus), hereafter sage-grouse, are underway across the range of this species. Over 70 local working groups have been established and are implementing on-the-ground sage-grouse oriented conservation projects. Early on in this process, the California Department of Fish and Game (CDFG) recognized the need to join in these efforts and received funding from the U.S. Fish and Wildlife Service (USFWS) under the Candidate Species Conservation Program to help develop a species conservation plan for sage-grouse in the Mono County area. This conservation plan covers portions of Alpine, Mono, and Inyo counties in California and Douglas, Esmeralda, Lyon, and Mineral counties in Nevada. A concurrent effort underway through the Nevada Governor's Sage-grouse Conservation Team established Local Area Working Groups across Nevada and eastern California. The Mono County populations of sage-grouse were encompassed by the Bi-State Local Planning Area, which was comprised of six population management units (PMUs). The state agencies from California (CDFG) and Nevada (Nevada Department of Wildlife; NDOW) responsible for the management of sage-grouse agreed to utilize the process that had begun with the Nevada Governor's Team in order to develop local plans for conservation planning and implementation. Resources from the USFWS were applied to several objectives in support of the development of the Bi-State Local Area Sage-grouse Conservation Plan through a grant to the U.S. Geological Survey (USGS). Objectives included: (1) participate in the development of the Bi-State Conservation Plan, (2) compile and synthesize existing sage-grouse data, (3) document seasonal movements of sage-grouse, (4) identify habitats critical to sage-grouse, (5) determine survival rates and identify causal factors of mortality, (6) determine nest success and brood success of sage-grouse, and (7) identify sage-grouse lek sites. Progress reports completed in 2004 and 2005 addressed each of the specific objectives and this final report focuses on the biological information gathered in support of local conservation efforts. Participation in the development of the Bi-State Local Area Conservation Plan was accomplished on multiple scales. Beginning in the fall of 2002, USGS personnel began participating in meetings of local stakeholders involved in the development of a sage-grouse conservation plan for the Bi-State planning area. This included attendance at numerous local PMU group meetings and field trips as well as participating on the technical advisory committee (TAC) for the Bi-State group. Whenever appropriate, ongoing results and findings regarding sage-grouse ecology in the local area were incorporated into these working group meetings. In addition, the USGS partnered with CDFG to help reorganize one of the local PMU groups (South Mono) and edited that portion of the Bi-State plan. The USGS also worked closely with CDFG to draft a description of the state of knowledge for sage-grouse genetic information for inclusion in the Bi-State Conservation Plan. The first edition of the Bi-State Conservation Plan for Greater Sage-Grouse was completed in June 2004 (Bi-State Sage-grouse Conservation Team 2004). This report is organized primarily by PMU to facilitate the incorporation of these research findings into the individual PMU plans that compose the Bi-State plan. Information presented in this report was derived from over 7,000 radio-telemetry locations obtained on 145 individual sage-grouse during a three year period (2003-2005). In addition, we collected detailed vegetation measurements at over 590 habitat sampling plots within the study area including canopy cover, shrubs, forbs, and grasses diversity. Vegetation data collection focused on sage-grouse nests, and brood-use areas. Additionally we collected data at random sites to examine sage-grouse habitat relationships within the study area. The majori
NASA Astrophysics Data System (ADS)
Ohl, Ricky
In this case study, computer supported argument visualisation has been applied to the analysis and representation of the draft South East Queensland Regional Plan Consultation discourse, demonstrating how argument mapping can help deliver the transparency and accountability required in participatory democracy. Consultative democracy for regional planning falls into a category of problems known as “wicked problems”. Inherent in this environment is heterogeneous viewpoints, agendas and voices, built on disparate and often contradictory logic. An argument ontology and notation that was designed specifically to deal with consultative urban planning around wicked problems is the Issue Based Information System (IBIS) and IBIS notation (Rittel & Webber, 1984). The software used for argument visualisation in this case was Compendium, a derivative of IBIS. The high volume of stakeholders and discourse heterogeneity in this environment calls for a unique approach to argument mapping. The map design model developed from this research has been titled a “Consultation Map”. The design incorporates the IBIS ontology within a hybrid of mapping approaches, amalgamating elements from concept, dialogue, argument, debate, thematic and tree-mapping. The consultation maps developed from the draft South East Queensland Regional Plan Consultation provide a transparent visual record to give evidence of the themes of citizen issues within the consultation discourse. The consultation maps also link the elicited discourse themes to related policies from the SEQ Regional Plan providing explicit evidence of SEQ Regional Plan policy-decisions matching citizen concerns. The final consultation map in the series provides explicit links between SEQ Regional Plan policy items and monitoring activities reporting on the ongoing implementation of the SEQ Regional Plan. This map provides updatable evidence of and accountability for SEQ Regional Plan policy implementation and developments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dameron, Arrelaine
During the duration of this CRADA, V-Glass and NREL will partner in testing, analysis, performance forecasting, costing, and evaluation of V-Glass’s GRIPWELD™ process technology for creating a low cost hermetic seal for conventional and vacuum glazing. Upon successful evaluation of hermeticity, V-Glass’s GRIPWELD™ will be evaluated for its potential use in highly insulating window glazing.
Roadmap for the Hypersonics Programs of the Department of Defense
2008-02-01
development and integration of a 1MW e-bean system to provide the necessary energy into the wind tunnel flow field to enable longer duration experiments at...acquired. Finally, “Test and Evaluation” (T&E) is defined as tests and experiments in support of research development and acquisition of systems...Research Experimentation (HIFiRE) project, the DARPA/AF Falcon program, and the DoD Next Generation Launch planning activities. 13 Joint
U.S. Army Medical Materiel Development Activity, 1987 Annual Report
1988-05-06
Argentina to determine efficacy of the Candid #1 vaccine in both immune and nonimmune populations. 12 %0 0 Shigella Vaccines are oral products containing...in Cebus monkeys at the University of Lowell, MA. Working groups were convened to outline clinical testing of the TAP and to finalize the draft...measure exposure rates. Data collected from these studies will be used to plan field trials for vaccines that have been developed including Shigella
1994-12-01
Developing an Object-oriented S DRGuoxiangGu WL/MNAG 5- 24 Louisiana State University , Baton Rouge , LA Gain Scheduled Missile Autopilot...candidates being notified of their acceptance after scheduled deadlines. The total applicants and participants for 1994 are shown in this table. Table 2...planning and scheduling literature to identify developments that might apply to the design of a sensor manager. Applications examined primarily come
EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.
Strategic Planning Study Team. Final Report.
ERIC Educational Resources Information Center
Tennessee Univ., Chattanooga.
This final report presents the results of a University of Tennessee at Chattanooga's (UTC) strategic planning study team, which was charged with documenting computerized services currently available and recommending to the UTC administration areas in which new services should be introduced at the university. A questionnaire was administered to…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-13
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-14
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-15
... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...