Climate Action Planning Process | Climate Neutral Research Campuses | NREL
Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and
43 CFR 10005.17 - Plan development process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan development process. 10005.17 Section 10005.17 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION...'S MITIGATION AND CONSERVATION PLAN § 10005.17 Plan development process. Following adoption of the...
Automating Space Station operations planning
NASA Technical Reports Server (NTRS)
Ziemer, Kathleen A.
1989-01-01
The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.
A ten-step process to develop case management plans.
Tahan, Hussein A
2002-01-01
The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.
Institutional Planning as a Participative Process: A Community College Self Study.
ERIC Educational Resources Information Center
Sturtz, Alan J.
In 1981, South Central Community College received funding to develop a long-range planning process. The process was to be modeled on the 3-year planning cycle developed by the National Center for Higher Education Management Systems and to use the college's existing organizational structure. Since November 1981, the planning process at the college…
20 CFR 668.700 - What process must an INA grantee use to plan its employment and training services?
Code of Federal Regulations, 2011 CFR
2011-04-01
... WORKFORCE INVESTMENT ACT Section 166 Planning/Funding Process § 668.700 What process must an INA grantee use to plan its employment and training services? (a) An INA grantee may utilize the planning procedures... development and administration of strategic community development efforts. ...
Information technology strategic planning: art or science?
Hutsell, Richard; Mancini-Newell, Lulcy
2005-01-01
It had been almost a decade since the hospitals that make up the Daughters of Charity Health System (DCHS) had engaged in a formal information technology strategic planning process. In the summer of 2002, as the health system re-formed, there was a unique opportunity to introduce a planning process that reflected the governance style of the new health system. DCHS embarked on this journey, with the CIO initiating and formally sponsoring the information technology strategic planning process in a dynamic and collaborative manner The system sought to develop a plan tailored to encompass both enterprise-wide and local requirements; to develop a governance model to engage the members of the local health ministries in plan development, both now and in the future; and to conduct the process in a manner that reflected the values of the Daughters of Charity. The DCHS CIO outlined a premise that the CIO would guide and be continuously involved in the development of this tailored process, in conjunction with an external resource. Together, there would be joint responsibility for introducing a flexible information technology strategic planning methodology; providing an education on the current state of healthcare IT, including future trends and success factors; facilitating support to tap into existing internal talent; cultivating a collaborative process to support both current requirements and future vision; and developing a well-functioning governance structure that would enable the plan to evolve and reflect user community requirements. This article highlights the planning process, including the lessons learned, the benchmarking during and in post-planning, and finally, but most importantly, the unexpected benefit that resulted from this planning process.
Strategic planning: getting from here to there.
Kaleba, Richard
2006-11-01
Hospitals should develop a strategic plan that defines specific actions in a realistic time frame. Hospitals can follow a five-phase process to develop a strategic plan. The strategic planning process requires a project leader and medical staff buy-in.
75 FR 80850 - Development of Strategic Plan 2011-2015
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-23
... intended for use as LSC embarks on its planning process. LSC anticipates publishing a draft Strategic Plan... process to develop a Strategic Plan for the years 2011-2015. Toward that end, LSC is soliciting... strategic planning efforts. In addition, Among other sources, LSC is considering the guidance provided by...
20 CFR 632.17 - Planning process.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Planning process. 632.17 Section 632.17... EMPLOYMENT AND TRAINING PROGRAMS Program Planning, Application and Modification Procedures § 632.17 Planning process. (a) Each Native American grantee shall establish a planning process for the development of its...
24 CFR 972.133 - Public and resident consultation process for developing a conversion plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Public and resident consultation process for developing a conversion plan. 972.133 Section 972.133 Housing and Urban Development... ASSISTANCE Required Conversion of Public Housing Developments Conversion Plans § 972.133 Public and resident...
MCPS Curriculum Development Planning Process.
ERIC Educational Resources Information Center
Montgomery County Public Schools, Rockville, MD. Dept. of Instructional Planning and Development.
The procedure documented is used for the systemwide planning of curriculum development in Montgomery County, Maryland, and consists of three parts: a planning and review process; an instructional design and development model; and a proposed calendar for cyclical review of programs. Specific position responsibilities, organizational charts, and…
Advanced planning for ISS payload ground processing
NASA Astrophysics Data System (ADS)
Page, Kimberly A.
2000-01-01
Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .
Code of Federal Regulations, 2014 CFR
2014-10-01
... Department of Health and Human Services GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Code of Federal Regulations, 2012 CFR
2012-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Code of Federal Regulations, 2013 CFR
2013-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
The Use of Multi-Criteria Evaluation and Network Analysis in the Area Development Planning Process
2013-03-01
layouts. The alternative layout scoring process, base in multi-criteria evaluation, returns a quantitative score for each alternative layout and a...The purpose of this research was to develop improvements to the area development planning process. These plans are used to improve operations within...an installation sub-section by altering the physical layout of facilities. One methodology was developed based on apply network analysis concepts to
San Diego's Capital Planning Process
ERIC Educational Resources Information Center
Lytton, Michael
2009-01-01
This article describes San Diego's capital planning process. As part of its capital planning process, the San Diego Unified School District has developed a systematic analysis of functional quality at each of its school sites. The advantage of this approach is that it seeks to develop and apply quantifiable metrics and standards for the more…
A Collaborative, Ongoing University Strategic Planning Framework: Process, Landmines, and Lessons
ERIC Educational Resources Information Center
Hill, Susan E. Kogler; Thomas, Edward G.; Keller, Lawrence F.
2009-01-01
This article examines the strategic planning process at Cleveland State University, a large metropolitan state university in Ohio. A faculty-administrative team used a communicative planning approach to develop a collaborative, ongoing, bottom-up, transparent strategic planning process. This team then spearheaded the process through plan…
Creating a nursing strategic planning framework based on evidence.
Shoemaker, Lorie K; Fischer, Brenda
2011-03-01
This article describes an evidence-informed strategic planning process and framework used by a Magnet-recognized public health system in California. This article includes (1) an overview of the organization and its strategic planning process, (2) the structure created within nursing for collaborative strategic planning and decision making, (3) the strategic planning framework developed based on the organization's balanced scorecard domains and the new Magnet model, and (4) the process undertaken to develop the nursing strategic priorities. Outcomes associated with the structure, process, and key initiatives are discussed throughout the article. Copyright © 2011 Elsevier Inc. All rights reserved.
Iowa in motion : transit system plan : implementing Iowa's state transportation plan
DOT National Transportation Integrated Search
1999-09-14
The Iowa Transit System Plan was developed as a result of the on-going long-range transportation planning process known as Iowa In Motion This planning document, the 1999 Iowa Transit System Plan, is the result of this continuing planning process and...
Automated process planning system
NASA Technical Reports Server (NTRS)
Mann, W.
1978-01-01
Program helps process engineers set up manufacturing plans for machined parts. System allows one to develop and store library of similar parts characteristics, as related to particular facility. Information is then used in interactive system to help develop manufacturing plans that meet required standards.
Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta
2016-01-01
ABSTRACT In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda’s CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda’s CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda’s CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621
Self-Study Guide for Florida VPK Provider Improvement Plan Development
ERIC Educational Resources Information Center
Phillips, Beth M.; Mazzeo, Debbie; Smith, Kevin
2016-01-01
This Self-Study Guide has been developed to support Florida Voluntary Prekindergarten Providers (VPK) who are required to complete an improvement plan process (i.e., low-performing providers). The guide has sections that can be used during both the process of selecting target areas for an improvement plan and the process of implementing new or…
To Plan or Not to Plan, That Is the Question
ERIC Educational Resources Information Center
Dolph, David A.
2016-01-01
Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…
Airport Planning and Development Process: Analysis and Documentation Report
DOT National Transportation Integrated Search
1997-01-01
The Federal Aviation Administration (FAA) is facing extreme resource constraints : and increasing demands on the aviation system. The Airport Planning and : Development Process (APDP) links organizations, people, and processes together : to provide c...
78 FR 57450 - State Rail Plan Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-18
... development of State rail plans, as appropriate. A commenter recommended that the FRA Regional Manager be... integration of State rail plan development within the statewide/nonmetropolitan transportation planning... Guidance is to describe the processes for the development, submission, and acceptance of State rail plans...
Implementation of a Web-Based Collaborative Process Planning System
NASA Astrophysics Data System (ADS)
Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi
Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.
A Search Algorithm for Generating Alternative Process Plans in Flexible Manufacturing System
NASA Astrophysics Data System (ADS)
Tehrani, Hossein; Sugimura, Nobuhiro; Tanimizu, Yoshitaka; Iwamura, Koji
Capabilities and complexity of manufacturing systems are increasing and striving for an integrated manufacturing environment. Availability of alternative process plans is a key factor for integration of design, process planning and scheduling. This paper describes an algorithm for generation of alternative process plans by extending the existing framework of the process plan networks. A class diagram is introduced for generating process plans and process plan networks from the viewpoint of the integrated process planning and scheduling systems. An incomplete search algorithm is developed for generating and searching the process plan networks. The benefit of this algorithm is that the whole process plan network does not have to be generated before the search algorithm starts. This algorithm is applicable to large and enormous process plan networks and also to search wide areas of the network based on the user requirement. The algorithm can generate alternative process plans and to select a suitable one based on the objective functions.
Strategies for automatic planning: A collection of ideas
NASA Technical Reports Server (NTRS)
Collins, Carol; George, Julia; Zamani, Elaine
1989-01-01
The main goal of the Jet Propulsion Laboratory (JPL) is to obtain science return from interplanetary probes. The uplink process is concerned with communicating commands to a spacecraft in order to achieve science objectives. There are two main parts to the development of the command file which is sent to a spacecraft. First, the activity planning process integrates the science requests for utilization of spacecraft time into a feasible sequence. Then the command generation process converts the sequence into a set of commands. The development of a feasible sequence plan is an expensive and labor intensive process requiring many months of effort. In order to save time and manpower in the uplink process, automation of parts of this process is desired. There is an ongoing effort to develop automatic planning systems. This has met with some success, but has also been informative about the nature of this effort. It is now clear that innovative techniques and state-of-the-art technology will be required in order to produce a system which can provide automatic sequence planning. As part of this effort to develop automatic planning systems, a survey of the literature, looking for known techniques which may be applicable to our work was conducted. Descriptions of and references for these methods are given, together with ideas for applying the techniques to automatic planning.
A public health hazard mitigation planning process.
Griffith, Jennifer M; Kay Carpender, S; Crouch, Jill Artzberger; Quiram, Barbara J
2014-01-01
The Texas A&M Health Science Center School of Rural Public Health, a member of the Training and Education Collaborative System Preparedness and Emergency Response Learning Center (TECS-PERLC), has long-standing partnerships with 2 Health Service Regions (Regions) in Texas. TECS-PERLC was contracted by these Regions to address 2 challenges identified in meeting requirements outlined by the Risk-Based Funding Project. First, within Metropolitan Statistical Areas, there is not a formal authoritative structure. Second, preexisting tools and processes did not adequately satisfy requirements to assess public health, medical, and mental health needs and link mitigation strategies to the Public Health Preparedness Capabilities, which provide guidance to prepare for, respond to, and recover from public health incidents. TECS-PERLC, with its partners, developed a framework to interpret and apply results from the Texas Public Health Risk Assessment Tool (TxPHRAT). The 3-phase community engagement-based TxPHRAT Mitigation Planning Process (Mitigation Planning Process) and associated tools facilitated the development of mitigation plans. Tools included (1) profiles interpreting TxPHRAT results and identifying, ranking, and prioritizing hazards and capability gaps; (2) a catalog of intervention strategies and activities linked to hazards and capabilities; and (3) a template to plan, evaluate, and report mitigation planning efforts. The Mitigation Planning Process provided a framework for Regions to successfully address all funding requirements. TECS-PERLC developed more than 60 profiles, cataloged and linked 195 intervention strategies, and developed a template resulting in 20 submitted mitigation plans. A public health-focused, community engagement-based mitigation planning process was developed by TECS-PERLC and successfully implemented by the Regions. The outcomes met all requirements and reinforce the effectiveness of academic practice partnerships and importance of community engagement in mitigation planning. Additional funding has been approved to expand the Mitigation Planning Process to all counties in Texas with local health departments.
Samal, Janmejaya; Dehury, Ranjit Kumar
2016-05-01
Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1(st) five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11(th) five year plan. A very strong optimistic approach in spreading India's own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence a continuous endeavor for the revival and dissemination of India's own medical inheritance for the welfare of the society at large is highly desirable.
Dehury, Ranjit Kumar
2016-01-01
Introduction Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. Objective The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. Materials and Methods A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Results Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1st five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11th five year plan. Conclusion A very strong optimistic approach in spreading India’s own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence a continuous endeavor for the revival and dissemination of India’s own medical inheritance for the welfare of the society at large is highly desirable. PMID:27437245
Code of Federal Regulations, 2010 CFR
2010-07-01
... GUIDELINES AND UNIFORM STANDARDS FOR URBAN PLANNING AND DESIGN OF DEVELOPMENT WITHIN THE PENNSYLVANIA AVENUE..., planned unit development, or project resulting from the process of planning, land acquisition, demolition...
Code of Federal Regulations, 2011 CFR
2011-07-01
... GUIDELINES AND UNIFORM STANDARDS FOR URBAN PLANNING AND DESIGN OF DEVELOPMENT WITHIN THE PENNSYLVANIA AVENUE..., planned unit development, or project resulting from the process of planning, land acquisition, demolition...
Nicholas Sawyer
2000-01-01
This paper describes the multi-stage public consultation process and other aspects of the development by the Tasmanian Parks and Wildlife Service of the second (1999) management plan for the Tasmanian Wilderness World Heritage Area (Australia). It describes the background to, and rationale for, the process used in developing the plan; it details the consultation...
24 CFR 572.315 - Rating criteria for planning grants.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Rating criteria for planning grants... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF... (HOPE 3) Selection Process § 572.315 Rating criteria for planning grants. Any planning grants made by...
NASA Technical Reports Server (NTRS)
Hase, Chris
2010-01-01
In August 2003, the Secretary of Defense (SECDEF) established the Adaptive Planning (AP) initiative [1] with an objective of reducing the time necessary to develop and revise Combatant Commander (COCOM) contingency plans and increase SECDEF plan visibility. In addition to reducing the traditional plan development timeline from twenty-four months to less than twelve months (with a goal of six months)[2], AP increased plan visibility to Department of Defense (DoD) leadership through In-Progress Reviews (IPRs). The IPR process, as well as the increased number of campaign and contingency plans COCOMs had to develop, increased the workload while the number of planners remained fixed. Several efforts from collaborative planning tools to streamlined processes were initiated to compensate for the increased workload enabling COCOMS to better meet shorter planning timelines. This paper examines the Joint Strategic Capabilities Plan (JSCP) directed contingency planning and staffing requirements assigned to a combatant commander staff through the lens of modeling and simulation. The dynamics of developing a COCOM plan are captured with an ExtendSim [3] simulation. The resulting analysis provides a quantifiable means by which to measure a combatant commander staffs workload associated with development and staffing JSCP [4] directed contingency plans with COCOM capability/capacity. Modeling and simulation bring significant opportunities in measuring the sensitivity of key variables in the assessment of workload to capability/capacity analysis. Gaining an understanding of the relationship between plan complexity, number of plans, planning processes, and number of planners with time required for plan development provides valuable information to DoD leadership. Through modeling and simulation AP leadership can gain greater insight in making key decisions on knowing where to best allocate scarce resources in an effort to meet DoD planning objectives.
Planning for strategic change? A participative planning approach for community hospitals.
MacDonald, S K; Beange, J E; Blachford, P C
1992-01-01
Strategic planning is becoming to hospitals what business case analysis is to private corporations. In fact, this type of planning is becoming essential for the professional management of Ontario hospitals. The participative strategic planning process at Toronto East General Hospital (TEGH) is an example of how a professionally structured and implemented strategic planning process can be successfully developed and implemented in a community hospital. In this article, the environmental factors driving planning are reviewed and the critical success factors for the development and implementation of a strategic plan are examined in the context of TEGH's experience.
The role of CQI in the strategic planning process.
Sahney, V K; Warden, G L
1993-01-01
This article describes the strategic planning process used to define the health care needs of a region and to prepare Henry Ford Health System (HFHS) to meet the needs of the 21st century. It presents key applications of continuous quality improvement in the development and implementation of the strategic plans for HFHS; explains how HFHS adapted the Deming/Shewhart cycle of continuous improvement for the purpose of improving its planning process; and delineates how the strategic planning, financial planning, and quality planning processes have been integrated.
Planning Process Obstacles and Opportunities.
ERIC Educational Resources Information Center
Doyle, Patricia C.
1997-01-01
Argues that obstacles exist in the Public Library Association (PLA) planning process that can be resolved by developing relationships between materials in the collection and PLA roles. Proposes changes to help reduce conflict in the PLA planning process and discusses process obstacles, relationships as the key providing better service, and…
Efficiency improvement of technological preparation of power equipment manufacturing
NASA Astrophysics Data System (ADS)
Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.
2017-11-01
Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.
ERIC Educational Resources Information Center
Mieso, Rob Roba
2010-01-01
This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…
NASA Technical Reports Server (NTRS)
1975-01-01
The basic sequence in the planning development process is discussed. Alternative ways of satisfying estimated needs, and the selection of an alternative are described along with the development of a plan to implement the selected alternative.
Creating an Effective Strategic Plan for the School District
ERIC Educational Resources Information Center
Lane, Randy J.; Bishop, Harold L.; Wilson-Jones, Linda
2005-01-01
The purpose of this study was to examine the process of developing a strategic plan for school districts through communication and involvement of all stakeholders. This process takes into consideration the diverse concerns and principles; supports scholarly and coherent decision making; and employs the development of a strategic plan through both…
Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel
2017-12-15
Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is needed to evaluate the implementation of the plans and, in many cases, the impact of the process on the plan. Performance can be improved with the assistance of policy makers by further developing guidelines, harmonising payment schemes with the conservation measures of the plans and providing training on conflict resolution. The evaluation framework proved to be suitable for the assessment of a large set of conservation related management planning processes, but it also had some limitations, e.g. concerning the incorporation of stakeholders' views in the evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.
Process Correlation Analysis Model for Process Improvement Identification
Park, Sooyong
2014-01-01
Software process improvement aims at improving the development process of software systems. It is initiated by process assessment identifying strengths and weaknesses and based on the findings, improvement plans are developed. In general, a process reference model (e.g., CMMI) is used throughout the process of software process improvement as the base. CMMI defines a set of process areas involved in software development and what to be carried out in process areas in terms of goals and practices. Process areas and their elements (goals and practices) are often correlated due to the iterative nature of software development process. However, in the current practice, correlations of process elements are often overlooked in the development of an improvement plan, which diminishes the efficiency of the plan. This is mainly attributed to significant efforts and the lack of required expertise. In this paper, we present a process correlation analysis model that helps identify correlations of process elements from the results of process assessment. This model is defined based on CMMI and empirical data of improvement practices. We evaluate the model using industrial data. PMID:24977170
Process correlation analysis model for process improvement identification.
Choi, Su-jin; Kim, Dae-Kyoo; Park, Sooyong
2014-01-01
Software process improvement aims at improving the development process of software systems. It is initiated by process assessment identifying strengths and weaknesses and based on the findings, improvement plans are developed. In general, a process reference model (e.g., CMMI) is used throughout the process of software process improvement as the base. CMMI defines a set of process areas involved in software development and what to be carried out in process areas in terms of goals and practices. Process areas and their elements (goals and practices) are often correlated due to the iterative nature of software development process. However, in the current practice, correlations of process elements are often overlooked in the development of an improvement plan, which diminishes the efficiency of the plan. This is mainly attributed to significant efforts and the lack of required expertise. In this paper, we present a process correlation analysis model that helps identify correlations of process elements from the results of process assessment. This model is defined based on CMMI and empirical data of improvement practices. We evaluate the model using industrial data.
Communications Contingency Plan: Planning for Crises and Controversy. Phase 1
NASA Technical Reports Server (NTRS)
Treise, Deborah; Bernstein, Arla G.; Yates, Brad
1998-01-01
Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.
Planning through a Decentralized Process. Case Study: University of Wisconsin-Stout.
ERIC Educational Resources Information Center
Hansen, Valerie R.
1979-01-01
The University of Wisconsin-Stout is in the third year of developing and implementing a long-range planning process in response to the decline in the traditional college-age population and scarce resources. Several basic principles that evolved with Stout's planning process are described, and a perspective for considering planning is suggested.…
Cooperative optimization of reconfigurable machine tool configurations and production process plan
NASA Astrophysics Data System (ADS)
Xie, Nan; Li, Aiping; Xue, Wei
2012-09-01
The production process plan design and configurations of reconfigurable machine tool (RMT) interact with each other. Reasonable process plans with suitable configurations of RMT help to improve product quality and reduce production cost. Therefore, a cooperative strategy is needed to concurrently solve the above issue. In this paper, the cooperative optimization model for RMT configurations and production process plan is presented. Its objectives take into account both impacts of process and configuration. Moreover, a novel genetic algorithm is also developed to provide optimal or near-optimal solutions: firstly, its chromosome is redesigned which is composed of three parts, operations, process plan and configurations of RMTs, respectively; secondly, its new selection, crossover and mutation operators are also developed to deal with the process constraints from operation processes (OP) graph, otherwise these operators could generate illegal solutions violating the limits; eventually the optimal configurations for RMT under optimal process plan design can be obtained. At last, a manufacturing line case is applied which is composed of three RMTs. It is shown from the case that the optimal process plan and configurations of RMT are concurrently obtained, and the production cost decreases 6.28% and nonmonetary performance increases 22%. The proposed method can figure out both RMT configurations and production process, improve production capacity, functions and equipment utilization for RMT.
24 CFR 598.400 - HUD grants for planning activities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... process describes the procedures for award of these planning grants, post-award reporting requirements... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false HUD grants for planning activities... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF...
Managing the TDM process : developing MPO institutional capacity - technical report.
DOT National Transportation Integrated Search
2015-04-01
Within Texas, the development of urban travel demand models (TDMs) is a cooperative process between the : Texas Department of Transportation and Metropolitan Planning Organizations (MPOs). Though TxDOT-Transportation Planning and Programming Division...
Frey, Keith; Cranmer, John Jack; Kirby, Lani J; Lenko, Paul H; Vrabel, Amy Z
2005-01-01
This article describes the Mayo Arizona process for developing an information technology strategic plan. The background of organizational events that gave rise to this strategic planning process is presented. A cross-functional team of key IT stakeholders was convened; the team used a facilitated process to derive a pro forma set of IT strategic objectives from the larger organization's emerging strategic plan. A broad set of leadership interviews was conducted to further identify detailed objectives that would confirm, complement, or conflict with the "strawperson." The IT strategic objectives then were refined and published by the organization. The article also describes the annual process of reviewing the IT strategic plan and translating it to a set of tactical objectives. This includes the committee structure for project prioritization, which is guided by the IT strategic plan. The outcome of the prioritization process is a five-year IT tactical plan, which is used to communicate the IT action plan for achievement of the strategic objectives. The strategic and tactical plans have resulted in stronger ownership and advocacy of IT activities by organizational leadership and a clearer view of the impact of technology on the organization's strategic plan.
Not planning a sustainable transport system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Finnveden, Göran, E-mail: goran.finnveden@abe.kth.se; Åkerman, Jonas
2014-04-01
The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment.more » Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.« less
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
Planning for Interagency Cooperation in Rural Development. CARD Report 45.
ERIC Educational Resources Information Center
Rogers, David L.; Glick, Edward L.
With a major emphasis on cooperative planning in rural development, three elements of development process were identified: (1) integration of units involved, occurring when several organizations contribute to a larger collective effort; (2) decentralized planning and local initiative, occurring when planning initiative is at the local level; (3)…
DOT National Transportation Integrated Search
2015-01-01
The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed by States...
ERIC Educational Resources Information Center
Stiler, Gary
2009-01-01
The author describes how the Understanding by Design (backwards planning) lesson plan format was used by his preservice K-12 students to develop service-learning lesson plans. Preservice teachers in a multicultural education course were given an assignment to develop service-learning lesson plans using the Understanding by Design planning process.…
Towards an Intelligent Planning Knowledge Base Development Environment
NASA Technical Reports Server (NTRS)
Chien, S.
1994-01-01
ract describes work in developing knowledge base editing and debugging tools for the Multimission VICAR Planner (MVP) system. MVP uses artificial intelligence planning techniques to automatically construct executable complex image processing procedures (using models of the smaller constituent image processing requests made to the JPL Multimission Image Processing Laboratory.
Peled, Ronit; Schenirer, Jerry
2009-10-01
This article describes a systematic process of geographic and strategic planning for healthcare services as a part of a regional development plan in the Israeli Galilee. The planning process consisted of three stages: (a) assessment of needs, demand and existing resources; (b) prioritisation of initiatives; and (c) scheduling of theoretical priorities. For many years the region has suffered from inequities and inequalities regarding the availability and accessibility of a regional healthcare system, resulting in high mortality and morbidity rates and low quality of life. The aim of the healthcare strategic plan was to suggest initiatives and actions to be taken in order to improve healthcare provision and the health and wellbeing of local residents.
Statewide ITS development and deployment plan
DOT National Transportation Integrated Search
2002-10-01
This plan was developed to create a means to implement the ongoing, short-term and long-term activities identified in the Statewide ITS Action Plan. As part of the process for organizing the approximately seventy-five Action Plan activities, these we...
Community of Interest Engagement Process Plan
2012-02-09
and input from Subject Matter Experts (SMEs), as shown in the far left of Figure 2. The team may prepare a Business Process Model Notation ( BPMN ) 22...22 Business Process Modeling Notation ( BPMN ) is a method of illustrating business processes in the form of a...Community of Interest Engagement Plan Joint Planning and Development Office 21 10. Acronyms BPMN Business Process Modeling Notation COI
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
Institutional Management through Organization Development.
ERIC Educational Resources Information Center
Ferguson, Charles O.
This paper provides information on the role of organizational development in the institutional planning process at Florida Junior College (FJC), using short statements on the functions and objectives of each of the major components within the planning process. First, an overview is provided of organizational development and its value in…
The California general plan process and sustainable transportation planning
DOT National Transportation Integrated Search
2002-05-01
This research project assesses California's General Plan process as a tool for implementing sustainable development, with particular emphasis on transportation systems at the local level, including the relationship of local transportation systems to ...
Autonomous Agents for Dynamic Process Planning in the Flexible Manufacturing System
NASA Astrophysics Data System (ADS)
Nik Nejad, Hossein Tehrani; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka
Rapid changes of market demands and pressures of competition require manufacturers to maintain highly flexible manufacturing systems to cope with a complex manufacturing environment. This paper deals with development of an agent-based architecture of dynamic systems for incremental process planning in the manufacturing systems. In consideration of alternative manufacturing processes and machine tools, the process plans and the schedules of the manufacturing resources are generated incrementally and dynamically. A negotiation protocol is discussed, in this paper, to generate suitable process plans for the target products real-timely and dynamically, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans are searched and generated to cope with both the dynamic changes of the product specifications and the disturbances of the manufacturing resources. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans in the dynamic manufacturing environment.
Implementation of the EU Noise Directive in Process of Urban Planning in Poland
NASA Astrophysics Data System (ADS)
Kwiecień, J.; Szopińska, K.
2013-05-01
In Poland spatial planning policies are described by a system of planning documents controlled by act of Spatial Planning and Land Development of 27 March 2003. Sustainable development principle and spatial order form is the basis of spatial planning efforts. In the territory of Poland the manner of urban space management is defined by a planning document called Local Land Use Plan (LLUP). In a LLUP some issues are arranged, such as the purpose of a given area, location of public purpose investments, land development conditions. When analysing the development process of Polish cities, an obvious conclusion emerges about the lack of complex studies and researches of the environment concerning the issue of acoustic climate. The procedures of development of an LLUP involve merely a general diagnosis of an environment excluding measured values of pollution, including noise levels. The main aim of this article is to introduce the influence of acoustic climate on the urban space planning in Poland through the implementation of the provisions of Directive 2002/49/WE of the European Parliament and the Council of Europe from 25 June 2002. Moreover, in the stages of an LLUP implementations have been suggested the use of a Strategic Noise Map, being a tool for assisting the process of environmental noise level assessment in Poland.
Planning and Teaching Creatively within a Required Curriculum for School-Age Learners
ERIC Educational Resources Information Center
McKay, Penny, Ed.; Graves, Kathleen, Ed.
2006-01-01
As the second volume of a seven-volume series, this book describes curriculum development as three interrelated processes: planning, enacting, and evaluating. Curriculum development is a dynamic process that happens among learners and teachers in the classroom. In this volume, readers will encounter teachers, curriculum developers, and…
ERIC Educational Resources Information Center
Limpo, Teresa; Alves, Rui A.; Fidalgo, Raquel
2014-01-01
Background: It is well established that the activity of producing a text is a complex one involving three main cognitive processes: Planning, translating, and revising. Although these processes are crucial in skilled writing, beginning and developing writers seem to struggle with them, mainly with planning and revising. Aims: To trace the…
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
NASA Astrophysics Data System (ADS)
Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka
Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.
Parallel plan execution with self-processing networks
NASA Technical Reports Server (NTRS)
Dautrechy, C. Lynne; Reggia, James A.
1989-01-01
A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.
2014-04-10
CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, Trey Carlson, the spaceport's master planner, describes how the Center Planning and Development Directorate CPD is working to help transform Kennedy into a multi-user spaceport through partnerships and resource planning. The event was first of what is planned to be quarterly meetings between NASA's industry partners and representatives of Kennedy's CPD, Safety and Mission Assurance, International Space Station Ground Processing, Chief Financial officer and Ground Processing and Ground Systems Development and Operations directorates. Center Planning and Development is the “front door” for partnerships with NASA’s Kennedy Space Center. Kennedy is now developing the world’s premier spaceport for government and commercial space industries using comprehensive resource planning and partnerships. Photo credit: NASA/Daniel Casper
2014-04-10
CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, Trey Carlson, the spaceport's master planner, describes how the Center Planning and Development Directorate CPD is working to help transform Kennedy into a multi-user spaceport through partnerships and resource planning. The event was first of what is planned to be quarterly meetings between NASA's industry partners and representatives of Kennedy's CPD, Safety and Mission Assurance, International Space Station Ground Processing, Chief Financial officer and Ground Processing and Ground Systems Development and Operations directorates. Center Planning and Development is the “front door” for partnerships with NASA’s Kennedy Space Center. Kennedy is now developing the world’s premier spaceport for government and commercial space industries using comprehensive resource planning and partnerships. Photo credit: NASA/Daniel Casper
Handbook for Educational Buildings Planning. Educational Building and Equipment 9.
ERIC Educational Resources Information Center
Almeida, Rodolfo
Stages in the educational facility planning process are presented in this handbook, with a second focus on implementation. Four chapters provide information on the four cycles of the planning process, which include analysis and diagnosis, research and development, planning and programming, and implementation and evaluation. Characteristics of an…
Green, Andrew; Collins, Charles; Stefanini, Angelo; Ferrinho, Paulo; Chapman, Glyn; Hagos, Besrat; Adams, Yussuf; Omar, Mayeh
2007-01-01
This paper reports on comparative analysis of health planning and its relationship with health care reform in three countries, Eritrea, Mozambique and Zimbabwe. The research examined strategic planning in each country focusing in particular on its role in developing health sector reforms. The paper analyses the processes for strategic planning, the values that underpin the planning systems, and issues related to resources for planning processes. The resultant content of strategic plans is assessed and not seen to have driven the development of reforms; whilst each country had adopted strategic planning systems, in all three countries a more complex interplay of forces, including influences outside both the health sector and the country, had been critical forces behind the sectoral changes experienced over the previous decade. The key roles of different actors in developing the plans and reforms are also assessed. The paper concludes that a number of different conceptions of strategic planning exist and will depend on the particular context within which the health system is placed. Whilst similarities were discovered between strategic planning systems in the three countries, there are also key differences in terms of formality, timeframes, structures and degrees of inclusiveness. No clear leadership role for strategic planning in terms of health sector reforms was discovered. Planning appears in the three countries to be more operational than strategic. Copyright (c) 2006 John Wiley & Sons, Ltd.
Wang, Huan; Dong, Peng; Liu, Hongcheng; Xing, Lei
2017-02-01
Current treatment planning remains a costly and labor intensive procedure and requires multiple trial-and-error adjustments of system parameters such as the weighting factors and prescriptions. The purpose of this work is to develop an autonomous treatment planning strategy with effective use of prior knowledge and in a clinically realistic treatment planning platform to facilitate radiation therapy workflow. Our technique consists of three major components: (i) a clinical treatment planning system (TPS); (ii) a formulation of decision-function constructed using an assemble of prior treatment plans; (iii) a plan evaluator or decision-function and an outer-loop optimization independent of the clinical TPS to assess the TPS-generated plan and to drive the search toward a solution optimizing the decision-function. Microsoft (MS) Visual Studio Coded UI is applied to record some common planner-TPS interactions as subroutines for querying and interacting with the TPS. These subroutines are called back in the outer-loop optimization program to navigate the plan selection process through the solution space iteratively. The utility of the approach is demonstrated by using clinical prostate and head-and-neck cases. An autonomous treatment planning technique with effective use of an assemble of prior treatment plans is developed to automatically maneuver the clinical treatment planning process in the platform of a commercial TPS. The process mimics the decision-making process of a human planner and provides a clinically sensible treatment plan automatically, thus reducing/eliminating the tedious manual trial-and-errors of treatment planning. It is found that the prostate and head-and-neck treatment plans generated using the approach compare favorably with that used for the patients' actual treatments. Clinical inverse treatment planning process can be automated effectively with the guidance of an assemble of prior treatment plans. The approach has the potential to significantly improve the radiation therapy workflow. © 2016 American Association of Physicists in Medicine.
Recent progress in utilization planning for Space Station Freedom
NASA Technical Reports Server (NTRS)
Bartoe, John-David F.; Thiringer, Peter S.
1991-01-01
The progress made in utilization planning for the redesigned Space Station Freedom (SSF) concept is described. Consideration is given to the SSF user capabilities, the strategic planning process, the strategic planning organizations, and the Consolidated Operations and Utilization Plan (COUP, which will be released in January 1993) as well as to the COUP development process and implementation. The process by which the COUP will be produced was exercised in the international Multilateral Strategic and Tactical Integration Process (MUSTIP) simulation. The paper describes the MUSTIP simulation and its activities along with MUSTIP findings and recommendations.
Collaboration process for integrated social and health care strategy implementation.
Korpela, Jukka; Elfvengren, Kalle; Kaarna, Tanja; Tepponen, Merja; Tuominen, Markku
2012-01-01
To present a collaboration process for creating a roadmap for the implementation of a strategy for integrated health and social care. The developed collaboration process includes multiple phases and uses electronic group decision support system technology (GDSS). A case study done in the South Karelia District of Social and Health Services in Finland during 2010-2011. An expert panel of 13 participants was used in the planning process of the strategy implementation. The participants were interviewed and observed during the case study. As a practical result, a roadmap for integrated health and social care strategy implementation has been developed. The strategic roadmap includes detailed plans of several projects which are needed for successful integration strategy implementation. As an academic result, a collaboration process to create such a roadmap has been developed. The collaboration process and technology seem to suit the planning process well. The participants of the meetings were satisfied with the collaboration process and the GDSS technology. The strategic roadmap was accepted by the participants, which indicates satisfaction with the developed process.
Tracking the Short Term Planning (STP) Development Process
NASA Technical Reports Server (NTRS)
Price, Melanie; Moore, Alexander
2010-01-01
Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."
DOT National Transportation Integrated Search
2011-01-01
This study develops an enhanced transportation planning framework by augmenting the sequential four-step : planning process with post-processing techniques. The post-processing techniques are incorporated through a feedback : mechanism and aim to imp...
77 FR 38580 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-28
... CEDS planning process and resulting CEDS is designed to guide the economic growth of an area and...: Economic Development Administration (EDA). Title: Comprehensive Economic Development Strategies. OMB... and Economic Adjustment programs, applicants must undertake a planning process that results in a...
Exploring Pre-Service Teachers' Perceptions of Lesson Planning in Primary Education
ERIC Educational Resources Information Center
Sahin-Taskin, Cigdem
2017-01-01
Planning a lesson is a complex process. The relationship between the quality of a lesson plan and an effective teaching-learning process is widely acknowledged by researchers and educators. Therefore, developing preservice teachers' planning skills is considered key in raising effective teachers. This research aims to understand pre-service…
How To Build a Strategic Plan: A Step-by-Step Guide for School Managers.
ERIC Educational Resources Information Center
Clay, Katherine; And Others
Strategic planning techniques for administrators, with a focus on process managers, are presented in this guidebook. The three major tasks of the strategic planning process include the assessment of the current organizational situation, goal setting, and the development of strategies to accomplish this. Strategic planning differs from long-range…
Implementing successful strategic plans: a simple formula.
Blondeau, Whitney; Blondeau, Benoit
2015-01-01
Strategic planning is a process. One way to think of strategic planning is to envision its development and design as a framework that will help your hospital navigate through internal and external changing environments over time. Although the process of strategic planning can feel daunting, following a simple formula involving five steps using the mnemonic B.E.G.I.N. (Begin, Evaluate, Goals & Objectives, Integration, and Next steps) will help the planning process feel more manageable, and lead you to greater success.
Application of science-based restoration planning to a desert river system.
Laub, Brian G; Jimenez, Justin; Budy, Phaedra
2015-06-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
Application of Science-Based Restoration Planning to a Desert River System
NASA Astrophysics Data System (ADS)
Laub, Brian G.; Jimenez, Justin; Budy, Phaedra
2015-06-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
Application of science-based restoration planning to a desert river system
Laub, Brian G.; Jimenez, Justin; Budy, Phaedra
2015-01-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
ActiveWV: a systematic approach to developing a physical activity plan for West Virginia.
Elliott, Eloise; Jones, Emily; Bulger, Sean
2014-03-01
Modeled after the National Physical Activity Plan (NPAP), ActiveWV 2015: The West Virginia Physical Activity Plan was developed to provide strategic direction for physical activity promotion within the state. The purpose of this manuscript is to describe the systematic approach taken in developing ActiveWV. Plan development began with establishing capacity and leadership among key stakeholders representing all societal sectors. A multiphase, statewide decision-making process allowed for input across sectors and geographic regions. The process results identified five priority areas that served as the conceptual framework for ActiveWV. Sector teams, comprised of key organization stakeholders across the eight sectors, finalized the sector-specific strategies and tactics using the NPAP evidence-based recommendations, results from a formalized strategic process, and the teams' expertise and experience. ActiveWV was officially released on January 19, 2012 at the State Capitol in Charleston, West Virginia. Community events throughout the state surrounded the release and celebrated West Virginia Physical Activity Day. Ongoing implementation and dissemination efforts are underway at state and local levels. As the NPAP calls for states and communities to develop plans that meet the needs of their particular context, other states may find the lessons learned from West Virginia helpful in the development process.
NASA Astrophysics Data System (ADS)
Hilburn, Monty D.
Successful lean manufacturing and cellular manufacturing execution relies upon a foundation of leadership commitment and strategic planning built upon solid data and robust analysis. The problem for this study was to create and employ a simple lean transformation planning model and review process that could be used to identify functional support staff resources required to plan and execute lean manufacturing cells within aerospace assembly and manufacturing sites. The lean planning model was developed using available literature for lean manufacturing kaizen best practices and validated through a Delphi panel of lean experts. The resulting model and a standardized review process were used to assess the state of lean transformation planning at five sites of an international aerospace manufacturing and assembly company. The results of the three day, on-site review were compared with baseline plans collected from each of the five sites to determine if there analyzed, with focus on three critical areas of lean planning: the number and type of manufacturing cells identified, the number, type, and duration of planned lean and continuous kaizen events, and the quantity and type of functional staffing resources planned to support the kaizen schedule. Summarized data of the baseline and on-site reviews was analyzed with descriptive statistics. ANOVAs and paired-t tests at 95% significance level were conducted on the means of data sets to determine if null hypotheses related to cell, kaizen event, and support resources could be rejected. The results of the research found significant differences between lean transformation plans developed by site leadership and plans developed utilizing the structured, on-site review process and lean transformation planning model. The null hypothesis that there was no difference between the means of pre-review and on-site cell counts was rejected, as was the null hypothesis that there was no significant difference in kaizen event plans. These factors are critical inputs into the support staffing resources calculation used by the lean planning model. Null hypothesis related to functional support staff resources was rejected for most functional groups, indicating that the baseline site plan inadequately provided for cross-functional staff involvement to support the lean transformation plan. Null hypotheses related to total lean transformation staffing could not be rejected, indicating that while total staffing plans were not significantly different than plans developed during the on-site review and through the use of the lean planning model, the allocation of staffing among various functional groups such as engineering, production, and materials planning was an issue. The on-site review process and simple lean transformation plan developed was determined to be useful in identifying short-comings in lean transformation planning within aerospace manufacturing and assembly sites. It was concluded that the differences uncovered were likely contributing factors affecting the effectiveness of aerospace manufacturing sites' implementation of lean cellular manufacturing.
23 CFR 450.306 - Scope of the metropolitan transportation planning process.
Code of Federal Regulations, 2011 CFR
2011-04-01
... transportation improvements and State and local planned growth and economic development patterns; (6) Enhance the... transportation system development, land use, employment, economic development, human and natural environment, and... CFR part 940. (g) Preparation of the coordinated public transit-human services transportation plan, as...
Strategic planning for hotel operations: The Ritz-Carlton Hotel Company (Part I).
Shriver, S J
1993-01-01
The Ritz-Carlton Hotel Company won the Malcolm Baldridge National Quality Award in 1992. One key to its success is its strategic planning process. This two-part article reviews the Ritz-Carlton's approach to strategic planning. In particular, it describes (1) the role of senior leadership in the planning process and (2) the specific activities that are associated with plan development and implementation.
Climate Assessment for Army Enterprise Planning Fact Sheet
2017-11-30
decision metric values that affect Army enterprise planning decisions . The payoff of this research improved planning processes for...portions of the processes . 1D. Approach The research approach identified and developed advanced decision metrics that quantified climate...fundamental physical and ecological processes to climate change for each of the decision metrics. Where there is significant interaction among
On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process
NASA Astrophysics Data System (ADS)
Hongzhi, Zhao; Jian, Zhang
2018-03-01
The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.
Policy Negotiations: Simulation as a Tool in Long-Range Library Planning
ERIC Educational Resources Information Center
Townley, Charles T.; And Others
1978-01-01
The development and use of a simulation game designed to facilitate nationwide long-range library planning for American Indian communities is described. The use of simulation outcomes in plan development is analyzed. Implications on the effectiveness of simulation in the library planning process are made. (Author)
DOT National Transportation Integrated Search
1997-02-01
This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...
ERIC Educational Resources Information Center
Germanna Community Coll., Locust Grove, VA.
In 1989, Germanna Community College (GCC) developed this comprehensive master plan to strengthen its planning process. Part I provides an overview of the development of the master plan, the mission statement of the Virginia Community College System (VCCS), and the mission and purpose statements of GCC. Part II summarizes demographic trends based…
A Model for Long Range Planning for Seminole Community College.
ERIC Educational Resources Information Center
Miner, Norris
A model for long-range planning designed to maximize involvement of college personnel, to improve communication among various areas of the college, to provide a process for evaluation of long-range plans and the planning process, to adjust to changing conditions, to utilize data developed at a level useful for actual operations, and to have…
13 CFR 303.6 - EDA-funded CEDS process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PLANNING INVESTMENTS AND COMPREHENSIVE ECONOMIC DEVELOPMENT STRATEGIES § 303.6 EDA-funded CEDS process. If EDA awards Investment Assistance to a Planning Organization to develop, revise or replace a CEDS, the... must appoint a Strategy Committee. The Strategy Committee must represent the main economic interests of...
75 FR 66319 - State Systems Advance Planning Document (APD) Process
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...
CPAS Preflight Drop Test Analysis Process
NASA Technical Reports Server (NTRS)
Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.
2015-01-01
Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.
Artificial intelligence techniques for scheduling Space Shuttle missions
NASA Technical Reports Server (NTRS)
Henke, Andrea L.; Stottler, Richard H.
1994-01-01
Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.
Faculty Planning, Development, and Evaluation System: Washtenaw Community College.
ERIC Educational Resources Information Center
Altieri, Guy; And Others
Between 1989 and 1991, the Planning, Development and Evaluation (PDE) Committee of Washtenaw Community College (Michigan) designed a faculty assessment process focusing on professional development and academic planning. It is an approach in which all educators (faculty and administrators) work together, using the PDE system to continually define…
Developmental Planning: An Introduction for Parents
ERIC Educational Resources Information Center
Noland, Jim
2009-01-01
"Developmental Planning" is the thinking process of using developmental milestones as a general basis for planning and predicting needs for the child within the early years. It considers the time frames associated with normal development across all facets of the child's development. The areas include bone and joint development, movement, sensory…
Development and implementation of an interdisciplinary plan of care.
Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff
2005-01-01
In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soria-Lara, Julio A., E-mail: j.a.sorialara@uva.nl; Bertolini, Luca, E-mail: l.bertolini@uva.nl; Brömmelstroet, Marco te, E-mail: M.C.G.teBrommelstroet@uva.nl
The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in themore » field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.« less
A strategic planning methodology for aircraft redesign
NASA Astrophysics Data System (ADS)
Romli, Fairuz Izzuddin
Due to a progressive market shift to a customer-driven environment, the influence of engineering changes on the product's market success is becoming more prominent. This situation affects many long lead-time product industries including aircraft manufacturing. Derivative development has been the key strategy for many aircraft manufacturers to survive the competitive market and this trend is expected to continue in the future. Within this environment of design adaptation and variation, the main market advantages are often gained by the fastest aircraft manufacturers to develop and produce their range of market offerings without any costly mistakes. This realization creates an emphasis on the efficiency of the redesign process, particularly on the handling of engineering changes. However, most activities involved in the redesign process are supported either inefficiently or not at all by the current design methods and tools, primarily because they have been mostly developed to improve original product development. In view of this, the main goal of this research is to propose an aircraft redesign methodology that will act as a decision-making aid for aircraft designers in the change implementation planning of derivative developments. The proposed method, known as Strategic Planning of Engineering Changes (SPEC), combines the key elements of the product redesign planning and change management processes. Its application is aimed at reducing the redesign risks of derivative aircraft development, improving the detection of possible change effects propagation, increasing the efficiency of the change implementation planning and also reducing the costs and the time delays due to the redesign process. To address these challenges, four research areas have been identified: baseline assessment, change propagation prediction, change impact analysis and change implementation planning. Based on the established requirements for the redesign planning process, several methods and tools that are identified within these research areas have been abstracted and adapted into the proposed SPEC method to meet the research goals. The proposed SPEC method is shown to be promising in improving the overall efficiency of the derivative aircraft planning process through two notional aircraft system redesign case studies that are presented in this study.
Strategic Planning for Independent Schools.
ERIC Educational Resources Information Center
Stone, Susan C.
This manual is intended to serve independent schools beginning strategic planning methods. Chapter 1, "The Case for Strategic Planning," suggests replacing the term "long range planning" with the term "strategic planning," which emphasizes change. The strategic planning and policy development process begins with…
ERIC Educational Resources Information Center
General Accounting Office, Washington, DC. Information Management and Technology Div.
As required by the Computer Security Act of 1987, federal agencies have to identify systems that contain sensitive information and develop plans to safeguard them. The planning process was assessed in 10 civilian agencies as well as the extent to which they had implemented planning controls described in 22 selected plans. The National Institute of…
Strategic planning in a complex academic environment: lessons from one academic health center.
Levinson, Wendy; Axler, Helena
2007-08-01
Leaders in academic health centers (AHCs) must create a vision for their academic unit embedded in a complex environment. A formal strategic planning process can be valuable to help shape a clear vision taking advantage of potential collaborations and to develop specific achievable long- and short-term goals. The authors describe the steps in a formal strategic planning process and illustrate it with the example of the Department of Medicine at the University of Toronto Faculty of Medicine beginning in 2004. The process included the active participation of over 300 faculty members, trainees, and stakeholders of the department and resulted in broad-based support and leadership for the resulting plan. The authors describe the steps, which include getting started, committing to planning principles, establishing the work plan, understanding the environment, pulling it all together, shaping the vision, testing strategic directions, building effective implementation, and promoting the plan. Articulation of vision, mission, and values informed the plan's development, as well as 10 key principles integral to the plan. Challenges and lessons learned are also described. The final strategic plan is an active core activity of the department, guiding decisions and resource allocation and facilitating measurement of success or shortcomings. The process the authors describe is applicable to multiple academic units, including divisions/sections, departments, or thematic programs in AHCs.
Strategic Planning: A (Site) Sight-Based Approach to Curriculum and Staff Development.
ERIC Educational Resources Information Center
Johnson, Daniel P.
The purpose of (Colorado's) Clear Creek School District's strategic planning process has been to develop basic district-wide parameters to promote instructional improvement through a process of shared leadership. The approach is termed "sight-based" to indicate the school district's commitment to connecting curriculum and…
Long-Range Strategic Planning: The Rochester Experience.
ERIC Educational Resources Information Center
Schultz, John M.; Anthony, Deborah L.
The administration of Rochester Community Schools (Michigan) initiated a process for long-range strategic planning in 1984, described in this synopsis. Strategic planning is an ongoing, evolutionary process of defining the business one is in or should be in; establishing organizational goals and objectives; and developing and implementing…
Research into Process Curricula.
ERIC Educational Resources Information Center
Andreas, Burton G.; And Others
These papers are related to the basic comprehensive research and development plan of the Eastern Regional Institute for Education (ERIE). The first paper, Improving Process Education: A Comprehensive Plan by Burton G. Andreas, describes the comprehensive plan and introduces the succeeding papers. The goals of the program are to improve process…
Master Plan for Data Processing Services, 1988-1993. Report.
ERIC Educational Resources Information Center
Connecticut Regional Community Colleges, Hartford. Board of Trustees.
Developed in accordance with a legislative mandate, this master plan for Connecticut's regional community colleges provides baseline data on the current status of data processing; identifies issues, trends, and constraints; and sets forth specific plans for computing activities and services within the community college system. Introductory…
Short Range Planning for Educational Management.
ERIC Educational Resources Information Center
Turksen, I. B.; Holzman, A. G.
A planning cycle for any autonomous university entity contains five basic processes: information storage and retrieval forecasting, resource allocation, scheduling, and a term of study with a feedback loop. The resource allocation process is investigated for the development of shortrange planning models. Dynamic models wth linear and quadratic…
Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique
2011-01-01
This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior management and the board in April 2009. This process has supported The Ottawa Hospital's journey of excellence through the creation of a quality plan that will enable long-term measurable and sustainable changes in the quality of patient care. It also engaged healthcare providers who aim to achieve more measured quality patient care, engaged practitioners through collaboration resulting in both alignment of goals and outcomes and allowed for greater commitment by those responsible for achieving quality goals.
Developing a Markup Language for Encoding Graphic Content in Plan Documents
ERIC Educational Resources Information Center
Li, Jinghuan
2009-01-01
While deliberating and making decisions, participants in urban development processes need easy access to the pertinent content scattered among different plans. A Planning Markup Language (PML) has been proposed to represent the underlying structure of plans in an XML-compliant way. However, PML currently covers only textual information and lacks…
ERIC Educational Resources Information Center
WEISENBURGER, RAY B.
PART OF A KANSAS STATE UNIVERSITY SERIES ON COMMUNITY PLANNING AND DEVELOPMENT, THIS MONOGRAPH DISCUSSES THE STAGES IN THE PREPARATION AND IMPLEMENTATION OF COMPREHENSIVE URBAN SCHEMES. FIRST OF ALL, SOCIAL ACCEPTANCE, ECONOMIC, FEASIBILITY, POLITICAL RESPONSIBILITY, AND ENVIRONMENTAL SATISFACTION ARE VITAL TO SUCCESSFUL PLANNING. ORGANIZATION FOR…
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... planning carried out under this subpart with statewide trade and economic development planning activities... CFR part 500. (e) States may apply asset management principles and techniques in establishing planning...
Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-05-01
The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kabat, C; Cline, K; Li, Y
Purpose: With increasing numbers of cancer patients being diagnosed and the complexity of radiotherapy treatments rising it’s paramount that patient plan development continues to stay fluid within the clinic. In order to maintain a high standard of care and clinical efficiency the establishment of a tracking system for patient plan development allows healthcare providers to view real time plan progression and drive clinical workflow. In addition, it provides statistical datasets which can further identify inefficiencies within the clinic. Methods: An application was developed utilizing Microsoft’s ODBC SQL database engine to track patient plan status throughout the treatment planning process whilemore » also managing key factors pertaining to the patient’s treatment. Pertinent information is accessible to staff in many locations, including tracking monitors within dosimetry, the clinic network for both computers and handheld devices, and through email notifications. Plans are initiated with a CT and continually tracked through planning stages until final approval by staff. Patient’s status is dynamically updated by the physicians, dosimetrists, and medical physicists based on the stage of the patient’s plan. Results: Our application has been running over a six month period with all patients being processed through the system. Modifications have been made to allow for new features to be implemented along with additional tracking parameters. Based on in-house feedback, the application has been supportive in streamlining patient plans through the treatment planning process and data has been accumulating to further improve procedures within the clinic. Conclusion: Over time the clinic will continue to track data with this application. As data accumulates the clinic will be able to highlight inefficiencies within the workflow and adapt accordingly. We will add in new features to help support the treatment planning process in the future.« less
Computer-aided software development process design
NASA Technical Reports Server (NTRS)
Lin, Chi Y.; Levary, Reuven R.
1989-01-01
The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.
The Organizational and the Interpersonal in an International Development Education Project.
ERIC Educational Resources Information Center
Bhola, H. S.
The organizational aspects of the process of innovation diffusion and the planned change and development as applied to an appraisal of international development education (IDE) are examined in this paper. The document begins by describing how effective organizations and institutions should be planned and structured to produce planned change. It…
ERIC Educational Resources Information Center
Szidon, Katherine; Ruppar, Andrea; Smith, Leann
2015-01-01
The Individuals With Disabilities Education Act (IDEA; 2006) requires schools to develop transition plans for students with disabilities, beginning at age 16, if not before. For students with autism spectrum disorder (ASD), the transition planning process includes unique considerations. This article describes five steps for developing effective…
44 CFR 201.4 - Standard State Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...
44 CFR 201.4 - Standard State Mitigation Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...
DOT National Transportation Integrated Search
2015-04-01
The Central New Mexico Climate Change Scenario Planning Project, an Interagency Transportation, Land Use, and Climate Change Initiative, utilized a scenario planning process to develop a multiagency transportation- and land use-focused development st...
Elwyn, Glyn; Hocking, Paul
2000-01-01
Background Improving the quality and effectiveness of clinical practice is becoming a key task within all health services. Primary medical care, as organised in the UK is composed of clinicians who work in independent partnerships (general practices) that collaborate with other health care professionals. Although many practices have successfully introduced innovations, there are no organisational development structures in place that support the evolution of primary medical care towards integrated care processes. Providing incentives for attendance at passive educational events and promoting 'teamwork' without first identifying organisational priorities are interventions that have proved to be ineffective at changing clinical processes. A practice and professional development plan feasibility study was evaluated in Wales and provided the experiential basis for a summary of the lessons learnt on how best to guide organisational development systems for primary medical care. Results Practice and professional development plans are hybrids produced by the combination of ideas from management (the applied behavioural science of organisational development) and education (self-directed adult learning theories) and, in conceptual terms, address the lack of effectiveness of passive educational strategies by making interventions relevant to identified system wide needs. In the intervention, each practice participated in a series of multidisciplinary workshops (minimum 4) where the process outcome was the production of a practice development plan and a set of personal portfolios, and the final outcome was a realised organisational change. It was apparent during the project that organisational admission to a process of developmental planning needed to be a stepwise process, where initial interest can lead to a fuller understanding, which subsequently develops into motivation and ownership, sufficient to complete the exercise. The advantages of introducing expert external facilitation were clear: evaluations of internal group processes were possible, strategic issues could be raised and explored and financial probity ensured. These areas are much more difficult to examine when only internal stakeholders are engaged in a planning process. Conclusions It is not possible to introduce practice and professional development plans (organisational development and organisational learning projects) in a publicly funded health care system without first addressing existing educational and management structures. Existing systems are based on educational credits for attendance and emerging accountability frameworks (criteria checklists) for clinical governance. Moving to systems that are less summative and more formative, and based on the philosophies of continual quality improvement, require changes to be made in the relevant support systems in order achieve policy proposals. PMID:11178111
TH-CD-209-01: A Greedy Reassignment Algorithm for the PBS Minimum Monitor Unit Constraint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lin, Y; Kooy, H; Craft, D
2016-06-15
Purpose: To investigate a Greedy Reassignment algorithm in order to mitigate the effects of low weight spots in proton pencil beam scanning (PBS) treatment plans. Methods: To convert a plan from the treatment planning system’s (TPS) to a deliverable plan, post processing methods can be used to adjust the spot maps to meets the minimum MU constraint. Existing methods include: deleting low weight spots (Cut method), or rounding spots with weight above/below half the limit up/down to the limit/zero (Round method). An alternative method called Greedy Reassignment was developed in this work in which the lowest weight spot in themore » field was removed and its weight reassigned equally among its nearest neighbors. The process was repeated with the next lowest weight spot until all spots in the field were above the MU constraint. The algorithm performance was evaluated using plans collected from 190 patients (496 fields) treated at our facility. The evaluation criteria were the γ-index pass rate comparing the pre-processed and post-processed dose distributions. A planning metric was further developed to predict the impact of post-processing on treatment plans for various treatment planning, machine, and dose tolerance parameters. Results: For fields with a gamma pass rate of 90±1%, the metric has a standard deviation equal to 18% of the centroid value. This showed that the metric and γ-index pass rate are correlated for the Greedy Reassignment algorithm. Using a 3rd order polynomial fit to the data, the Greedy Reassignment method had 1.8 times better metric at 90% pass rate compared to other post-processing methods. Conclusion: We showed that the Greedy Reassignment method yields deliverable plans that are closest to the optimized-without-MU-constraint plan from the TPS. The metric developed in this work could help design the minimum MU threshold with the goal of keeping the γ-index pass rate above an acceptable value.« less
Strategic planning: the basics and benefits.
Hansen, R D
1999-01-01
Strategic planning can help a medical practice take an honest look at itself in light of the changes taking place in its environment and within the practice itself. The objective is for the group to design a plan, or road map, to its envisioned future. For medical practices, strategic planning is a four part process: 1) gaining buy-in for the process itself from the leadership and physicians; 2) gathering pertinent data about the group's environment through external resources, and about the group itself through interviews and surveys of physicians; 3) conducting a facilitated off-site retreat of key physicians and leaders in order to review data, discuss issues and develop a one to two year action plan; and, 4) carrying out the action plan developed at the retreat and measuring its outcomes. A follow-up mini-retreat about six months after the first retreat is highly recommended, as is instituting a process of sharing of the results and outcomes of the plan with all members of the organization.
MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiCostanzo, D; Woollard, J; Gupta, N
2015-06-15
Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactionsmore » with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication between all parties involved in the TP process increasing patient safety.« less
Software for Probabilistic Risk Reduction
NASA Technical Reports Server (NTRS)
Hensley, Scott; Michel, Thierry; Madsen, Soren; Chapin, Elaine; Rodriguez, Ernesto
2004-01-01
A computer program implements a methodology, denoted probabilistic risk reduction, that is intended to aid in planning the development of complex software and/or hardware systems. This methodology integrates two complementary prior methodologies: (1) that of probabilistic risk assessment and (2) a risk-based planning methodology, implemented in a prior computer program known as Defect Detection and Prevention (DDP), in which multiple requirements and the beneficial effects of risk-mitigation actions are taken into account. The present methodology and the software are able to accommodate both process knowledge (notably of the efficacy of development practices) and product knowledge (notably of the logical structure of a system, the development of which one seeks to plan). Estimates of the costs and benefits of a planned development can be derived. Functional and non-functional aspects of software can be taken into account, and trades made among them. It becomes possible to optimize the planning process in the sense that it becomes possible to select the best suite of process steps and design choices to maximize the expectation of success while remaining within budget.
Autonomous Vehicle Mission Planning Using AI (Artificial Intelligence) Techniques.
1985-12-01
it uses are declarative patterns that encode facts about how goals may give rise to - . plans. The program processes a story a sentence at a time...the planning process. By separating the knowledge about how to plan from the specific domain knowledge, an understander can use this knowledge about how ...path planning program developed in a previous thesis effort will be incorporated into the overall program in order to demonstrate the operating system
Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.
ERIC Educational Resources Information Center
Odell, John H.
A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how to set up a master planning team and establish a plan for quickly completing the building process. It provides an overview of…
Towards automatic planning for manufacturing generative processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
CALTON,TERRI L.
2000-05-24
Generative process planning describes methods process engineers use to modify manufacturing/process plans after designs are complete. A completed design may be the result from the introduction of a new product based on an old design, an assembly upgrade, or modified product designs used for a family of similar products. An engineer designs an assembly and then creates plans capturing manufacturing processes, including assembly sequences, component joining methods, part costs, labor costs, etc. When new products originate as a result of an upgrade, component geometry may change, and/or additional components and subassemblies may be added to or are omitted from themore » original design. As a result process engineers are forced to create new plans. This is further complicated by the fact that the process engineer is forced to manually generate these plans for each product upgrade. To generate new assembly plans for product upgrades, engineers must manually re-specify the manufacturing plan selection criteria and re-run the planners. To remedy this problem, special-purpose assembly planning algorithms have been developed to automatically recognize design modifications and automatically apply previously defined manufacturing plan selection criteria and constraints.« less
1989-08-01
microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoo, Jun Soo; Choi, Yong Joon; Smith, Curtis Lee
2016-09-01
This document addresses two subjects involved with the RELAP-7 Software Verification and Validation Plan (SVVP): (i) the principles and plan to assure the independence of RELAP-7 assessment through the code development process, and (ii) the work performed to establish the RELAP-7 assessment plan, i.e., the assessment strategy, literature review, and identification of RELAP-7 requirements. Then, the Requirements Traceability Matrices (RTMs) proposed in previous document (INL-EXT-15-36684) are updated. These RTMs provide an efficient way to evaluate the RELAP-7 development status as well as the maturity of RELAP-7 assessment through the development process.
Integrated urban water planning: big picture planning is good for the wallet and the environment.
Anderson, J; Iyaduri, R
2003-01-01
The demands on governments and local authorities are changing in response to community expectations for environmentally sustainable outcomes. To reverse declining water quality in rivers and ensure sustainable use in the 21st century, the State Government in New South Wales has introduced a package of Water Reforms. The introduction of integrated water, sewerage and drainage planning is one of the Water Reform initiatives. Traditionally, government and local authorities have managed their water supply, sewerage and stormwater drainage systems as separate entities. Integrated urban water planning is a structured planning process to evaluate concurrently the opportunities to improve the management of water, sewerage and drainage services within an urban area in ways which are consistent with broader catchment and river management objectives. The New South Wales Department of Land & Water Conservation (DLWC) has developed an integrated urban water planning process through a number of recent pilot studies. The process links urban water management objectives to overall catchment and river management objectives. DLWC is currently developing a set of guidelines for integrated urban water plans. DLWC has developed the Integrated Urban Water Planning methodology through three pilot studies in the New South Wales towns of Finley, Goulburn and Bombala. The pilot studies have shown that an integrated approach to water, sewerage and stormwater planning can identify opportunities that are not apparent when separate strategies are developed for each service. The result is better-integrated, more sustainable solutions, and substantial cost savings for local communities.
NASA Astrophysics Data System (ADS)
Swanson, Lauren H.; Bianchini, Julie A.
2015-12-01
In this study, we investigated the process of teacher co-planning. We examined two teams of high school science and special education teachers brought together to co-plan inclusive, inquiry-oriented science units as part of a professional development effort. We used three conceptual lenses to help make sense of this process: (1) characteristics of collaboration, (2) small group interactions, and (3) community discourse. Using these lenses individually and collectively, we identified strengths and limitations in teachers' co-planning efforts. A strength was that all teachers, irrespective of discipline, shared ideas and helped make decisions about the content and activities included in unit and lesson plans. A limitation was that teachers, again irrespective of discipline, discussed science education topics in their teams more often than special education ones. We found this latter finding of note as it spoke to issues of parity among teachers during the professional development. In our discussion, we argue that each conceptual lens yielded both unique and common findings on co-planning. We also provide recommendations for professional developers and educational scholars intent on organizing and/or researching co-planning among science and special education teachers.
Integrating impact assessment and conflict management in urban planning: Experiences from Finland
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peltonen, Lasse, E-mail: lasse.peltonen@tkk.f; Sairinen, Rauno, E-mail: rauno.sairinen@joensuu.f
2010-09-15
The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impactmore » assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.« less
Intelligent Transportation Systems statewide architecture : final report.
DOT National Transportation Integrated Search
2003-06-01
This report describes the development of Kentuckys Statewide Intelligent Transportation Systems (ITS) Architecture. The process began with the development of an ITS Strategic Plan in 1997-2000. A Business Plan, developed in 2000-2001, translated t...
Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan
NASA Technical Reports Server (NTRS)
1988-01-01
An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.
Charter School Facilities: A Resource Guide on Development and Financing.
ERIC Educational Resources Information Center
Jakubowski, Lara
This manual provides information to help charter schools navigate the facility development process, including worksheets that can be customized to suit a particular school's needs. Sections cover how facility planning fits into business planning for charter schools, review a process for assessing a school's facility needs, and summarize how to…
75 FR 68199 - Fisheries in the Western Pacific; Community Development Program Process
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... 665 [Docket No. 0907211157-0522-04] RIN 0648-AX76 Fisheries in the Western Pacific; Community... Ecosystem Plans for American Samoa, Hawaii, the Mariana Archipelago, and Western Pacific Pelagic Fisheries, relating to the community development plan process. The intent of this final rule is to inform the public...
ERIC Educational Resources Information Center
Botha, M.; Maree, J. G.; de Witt, M. W.
2005-01-01
From an early age young children actively engage informally in acquiring fundamental concepts and process skills that form a basis for mathematical understanding. Quite logically, questions will arise during planning when young children first encounter a more formal learning environment: what strategy should one use to develop mathematical …
District of Columbia Early Care and Education Strategic Plan.
ERIC Educational Resources Information Center
District of Columbia Univ., Washington, DC. Center for Applied Research and Urban Policy.
This report details the early care and education strategic plan for the District of Columbia. Following an executive summary, the report provides the rationale for developing an early care and education strategic plan and describes the process used to develop the plan. The top 10 early care and education issues in the district are then delineated…
Thinking around the Corner: The Development of Planning Abilities
ERIC Educational Resources Information Center
Kaller, Cristopher P.; Rahm, Benjamin; Spreer, Joachim; Mader, Irina; Unterrainer, Josef M.
2008-01-01
The ability to plan and search ahead is essential for problem solving in most situations in everyday life. To investigate the development of planning and related processes, a sample of four- and five-year-old children was examined in a variant of the Tower of London, a frequently used neuropsychological assessment tool of planning abilities. The…
24 CFR 570.485 - Making of grants.
Code of Federal Regulations, 2014 CFR
2014-04-01
... future performance. If the Secretary makes any such determination, however, the State may be required to...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN... includes requirements for the content of the consolidated plan, for the process of developing the plan...
24 CFR 570.485 - Making of grants.
Code of Federal Regulations, 2010 CFR
2010-04-01
... future performance. If the Secretary makes any such determination, however, the State may be required to...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN... includes requirements for the content of the consolidated plan, for the process of developing the plan...
24 CFR 570.485 - Making of grants.
Code of Federal Regulations, 2012 CFR
2012-04-01
... future performance. If the Secretary makes any such determination, however, the State may be required to...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN... includes requirements for the content of the consolidated plan, for the process of developing the plan...
Miami Valley ITS : early deployment plan : final user service plan
DOT National Transportation Integrated Search
1997-07-01
This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...
NASA Technical Reports Server (NTRS)
Mcmanus, Shawn; Mcdaniel, Michael
1989-01-01
Planning for processing payloads was always difficult and time-consuming. With the advent of Space Station Freedom and its capability to support a myriad of complex payloads, the planning to support this ground processing maze involves thousands of man-hours of often tedious data manipulation. To provide the capability to analyze various processing schedules, an object oriented knowledge-based simulation environment called the Advanced Generic Accomodations Planning Environment (AGAPE) is being developed. Having nearly completed the baseline system, the emphasis in this paper is directed toward rule definition and its relation to model development and simulation. The focus is specifically on the methodologies implemented during knowledge acquisition, analysis, and representation within the AGAPE rule structure. A model is provided to illustrate the concepts presented. The approach demonstrates a framework for AGAPE rule development to assist expert system development.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dedicating or reserving the land so saved to open space. (2) Community development plan. A narrative plan... with exploration, development, mining or processing of mineral resources except prospecting which will...
Code of Federal Regulations, 2013 CFR
2013-07-01
... dedicating or reserving the land so saved to open space. (2) Community development plan. A narrative plan... with exploration, development, mining or processing of mineral resources except prospecting which will...
Code of Federal Regulations, 2012 CFR
2012-07-01
... dedicating or reserving the land so saved to open space. (2) Community development plan. A narrative plan... with exploration, development, mining or processing of mineral resources except prospecting which will...
Code of Federal Regulations, 2011 CFR
2011-07-01
... dedicating or reserving the land so saved to open space. (2) Community development plan. A narrative plan... with exploration, development, mining or processing of mineral resources except prospecting which will...
Code of Federal Regulations, 2010 CFR
2010-07-01
... dedicating or reserving the land so saved to open space. (2) Community development plan. A narrative plan... with exploration, development, mining or processing of mineral resources except prospecting which will...
NASA Astrophysics Data System (ADS)
Lober, Terence
The thesis is concerned with the prospects for reducing strategic-local tensions in the British planning process. It examines the conflicts surrounding small general aviation aerodromes as a means of understanding these tensions, why they have evolved, and if they might be reconciled through planning reform. The only prior academic research to have touched upon this issue through general aviation has been an ESRC funded project undertaken by Gallent and colleagues (1999), who found aerodromes provided a microcosm of planning's issues. Building on this work, the thesis develops what is meant by strategic-local tensions, which in broad terms are described as differences between national and regional guidance/plans and what actually takes place locally. Moving from a basic research question it develops a wide planning perspective based on the literature by discussing the meaning of planning, its history and issues for example, how conflicts in planning might be influenced by the broader socio-political environment. The thesis then arrives at three hypotheses which question the effectiveness of the existing strategic guideline implementation process, develops a local planning authority framework and addresses issues of reflectivity and bias. Results from three national surveys of pilots, aerodromes and manufacturers, plus longitudinal analysis of government and other datasets, are then used to detail a comprehensive and unique description of general aviation, which includes a costing based account of the direct expenditure of flying activity. This provides a substantive foundation for a local planning authority survey which both extends previous boundaries and enables the process of implementing strategic objectives to be disaggregated and evaluated. Field visits to twenty six aerodromes and five local authorities are subsequently used to explore gaps within the strategic implementation process and to develop conclusions, within the wider landscape of planning, about the nature of strategic local tensions and implications for planning reform.
ERIC Educational Resources Information Center
Kontos, Pia C.; Miller, Karen-Lee; Mitchell, Gail J.
2010-01-01
Purpose: The Resident Assessment Instrument-Minimum Data Set (RAI/MDS) is an interdisciplinary standardized process that informs care plan development in nursing homes. This standardized process has failed to consistently result in individualized care planning, which may suggest problems with content and planning integrity. We examined the…
Real estate investments demand strategic planning, objectives.
Bermas, N F
1991-10-01
Real estate may present a great opportunity for institutions to positively affect their bottom lines. But it takes planning and foresight to achieve a solid real estate plan. In the following article, the author describes the process necessary to develop a program that goes beyond converting empty buildings into nursing homes. The process goes from identifying strategic objectives to examining financial alternatives and preparing an implementation plan.
Integrated urban systems model with multiple transportation supply agents.
DOT National Transportation Integrated Search
2012-10-01
This project demonstrates the feasibility of developing quantitative models that can forecast future networks under : current and alternative transportation planning processes. The current transportation planning process is modeled : based on empiric...
Congestion Management System Process Report
DOT National Transportation Integrated Search
1996-03-01
In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...
NASA Technical Reports Server (NTRS)
Chien, Steve; Kandt, R. Kirk; Roden, Joseph; Burleigh, Scott; King, Todd; Joy, Steve
1992-01-01
Scientific data preparation is the process of extracting usable scientific data from raw instrument data. This task involves noise detection (and subsequent noise classification and flagging or removal), extracting data from compressed forms, and construction of derivative or aggregate data (e.g. spectral densities or running averages). A software system called PIPE provides intelligent assistance to users developing scientific data preparation plans using a programming language called Master Plumber. PIPE provides this assistance capability by using a process description to create a dependency model of the scientific data preparation plan. This dependency model can then be used to verify syntactic and semantic constraints on processing steps to perform limited plan validation. PIPE also provides capabilities for using this model to assist in debugging faulty data preparation plans. In this case, the process model is used to focus the developer's attention upon those processing steps and data elements that were used in computing the faulty output values. Finally, the dependency model of a plan can be used to perform plan optimization and runtime estimation. These capabilities allow scientists to spend less time developing data preparation procedures and more time on scientific analysis tasks. Because the scientific data processing modules (called fittings) evolve to match scientists' needs, issues regarding maintainability are of prime importance in PIPE. This paper describes the PIPE system and describes how issues in maintainability affected the knowledge representation used in PIPE to capture knowledge about the behavior of fittings.
Software verification plan for GCS. [guidance and control software
NASA Technical Reports Server (NTRS)
Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.
1990-01-01
This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.
Developing family planning nurse practitioner protocols.
Hawkins, J W; Roberto, D
1984-01-01
This article focuses on the process of development of protocols for family planning nurse practitioners. A rationale for the use of protocols, a definition of the types and examples, and the pros and cons of practice with protocols are presented. A how-to description for the development process follows, including methods and a suggested tool for critique and evaluation. The aim of the article is to assist nurse practitioners in developing protocols for their practice.
A Successful Infusion Process for Enabling Lunar Exploration Technologies
NASA Technical Reports Server (NTRS)
Over, Ann P.; Klem, Mark K.; Motil, Susan M.
2008-01-01
The NASA Vision for Space Exploration begins with a more reliable flight capability to the International Space Station and ends with sending humans to Mars. An important stepping stone on the path to Mars encompasses human missions to the Moon. There is little doubt throughout the stakeholder community that new technologies will be required to enable this Vision. However, there are many factors that influence the ability to successfully infuse any technology including the technical risk, requirement and development schedule maturity, and, funds available. This paper focuses on effective infusion processes that have been used recently for the technologies in development for the lunar exploration flight program, Constellation. Recent successes with Constellation customers are highlighted for the Exploration Technology Development Program (ETDP) Projects managed by NASA Glenn Research Center (GRC). Following an overview of the technical context of both the flight program and the technology capability mapping, the process is described for how to effectively build an integrated technology infusion plan. The process starts with a sound risk development plan and is completed with an integrated project plan, including content, schedule and cost. In reality, the available resources for this development are going to change over time, necessitating some level of iteration in the planning. However, the driving process is based on the initial risk assessment, which changes only when the overall architecture changes, enabling some level of stability in the process.
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Integration with the State mechanized claims processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval... processing and information retrieval system. (2) The action plan must describe the actions and methodologies...
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Integration with the State mechanized claims processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval... processing and information retrieval system. (2) The action plan must describe the actions and methodologies...
University Strategic Planning: A Process for Change in a Principal Preparation Program
ERIC Educational Resources Information Center
Guerra, Federico R.; Zamora, Roberto; Hernandez, Rosalinda; Menchaca, Velma
2017-01-01
This study describes a strategic planning process used for developing an educational leadership program that prepares principals for leading 21st century schools. The plan is based on recommendations received from the External reviewers representing Southern Association of Colleges and Schools, the Texas Education Agency, survey responses received…
Teaching Design in Television Production Technology: The Twelve Steps of Preproduction
ERIC Educational Resources Information Center
Harrison, Henry L. (Hal), III; Loveland, Thomas
2009-01-01
Extensive planning must be used to produce television programs. Students must develop sound design practices and understand these attributes of design in their production planning. Through the design and planning processes involved in television production, students learn that design is a creative process, and that there is no perfect design, but…
Land management planning: a method of evaluating alternatives
Andres Weintraub; Richard Adams; Linda Yellin
1982-01-01
A method is described for developing and evaluating alternatives in land management planning. A structured set of 15 steps provides a framework for such an evaluation. when multiple objectives and uncertainty must be considered in the planning process. The method is consistent with other processes used in organizational evaluation, and allows for the interaction of...
A Comparative Analysis of the Budget Process in the Venezuelan and U.S. Navies.
1979-12-01
accounting problems in particular agencies. The DINCA developed a document, Sistema de Contabilidad de la Ejecucion Financiera del Presupuesto para...orienta- tion of the "Plan Operativo Anual" (POA) - Operative Annual Plan. During the Navy’s mid-range planning process the POA is produced. By means of
Planning Brings Vision Into Focus (Brochure)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2013-04-01
This case study/fact sheet highlights the strategic energy planning process for Tribes that was developed by the DOE Office of Indian Energy. This nine-step process, which is outlined in one of the foundational education courses offered by the Office, enables Tribes to pursue energy projects in a well-planned and strategic manner.
Scenario Planning at College of Marin.
ERIC Educational Resources Information Center
College of Marin, Kentfield, CA.
This article reviews the scenario planning process implemented at the College of Marin (California). Scenario planning is a creative process in which a group of people who share a common fate develop stories about different ways their future might unfold, and use these stories to make decisions about what path to take. The Global Business Network…
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintainting the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems. This paper describes a planning application of automated imaging processing and our overall approach to knowledge acquisition for this application.
The development of a land use inventory for regional planning using satellite imagery
NASA Technical Reports Server (NTRS)
Hessling, A. H.; Mara, T. G.
1975-01-01
Water quality planning in Ohio, Kentucky, and Indiana is reviewed in terms of use of land use data and satellite imagery. A land use inventory applicable to water quality planning and developed through computer processing of LANDSAT-1 imagery is described.
College Planning for Gifted Students.
ERIC Educational Resources Information Center
Berger, Sandra L.
This paper asserts that for gifted students, college planning should be one step in a life development process that takes place between 7th and 12th grades. Characteristics of gifted students that affect their college planning include multipotentiality, sensitivity to competing expectations, uneven development, ownership of their abilities,…
The development and evaluation of a succession planning programme in nursing, in Australia.
Brunero, Scott; Kerr, Suzie; Jastrzab, Grazyna
2009-07-01
This study reports on a locally organized model of succession planning in a 550-bed general hospital. Within healthcare, succession planning has traditionally been considered for people at the executive director level and little research has been published with nurses working at the clinical level. A succession planning model was developed from the literature and through a process of consultation with senior staff. The model was then evaluated from a customer satisfaction, programme progress, effective placement and organizational results perspectives. Nurses who were successful in obtaining a new role were surveyed after 6 weeks in the position. Descriptive statistics, including numbers of placements and types of positions filled, were recorded. A checklist for conducting a programme evaluation of succession planning was also used. Twenty-five nurses participated, with 31 positions succeeded to. Nurses reported positively that the programme was beneficial, increased their sense of career planning and gave them a greater understanding of their career pathway. The succession planning programme provided an opportunity for the organization to identify new leaders. The study outcomes have identified potential improvements to the way succession planning is conducted at the hospital. Nurse Managers are in key positions to develop effective succession planning models. This study offers a process for managers to develop effective succession planning programmes within their organization.
Reid, Rebecca; Escott, Phil; Isobel, Sophie
2018-04-14
This qualitative study explores inpatient mental health consumer perceptions of how collaborative care planning with mental health nurses impacts personal recovery. Semi-structured interviews were conducted with consumers close to discharge from one unit in Sydney, Australia. The unit had been undertaking a collaborative care planning project which encouraged nurses to use care plan documentation to promote person-centred and goal-focussed interactions and the development of meaningful strategies to aid consumer recovery. The interviews explored consumer understandings of the collaborative care planning process, perceptions of the utility of the care plan document and the process of collaborating with the nurses, and their perception of the impact of collaboration on their recovery. Findings are presented under four organizing themes: the process of collaborating, the purpose of collaborating, the nurse as collaborator and the role of collaboration in wider care and recovery. Consumers highlighted the importance of the process of developing their care plan with a nurse as being as helpful for recovery as the goals and strategies themselves. The findings provide insights into consumers' experiences of care planning in an acute inpatient unit, the components of care that support recovery and highlight specific areas for mental health nursing practice improvement in collaboration. © 2018 Australian College of Mental Health Nurses Inc.
Renewable Energy Zone (REZ) Transmission Planning Process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Nathan
A REZ is a geographical area that enables the development of profitable, cost-effective, grid-connected renewable energy (RE). The REZ Transmission Planning Process is a proactive approach to plan, approve, and build transmission infrastructure connecting REZs to the power system which helps to increase the share of solar, wind and other RE resources in the power system while maintaining reliability and economics, and focuses on large-scale wind and solar resources that can be developed in sufficient quantities to warrant transmission system expansion and upgrades.
Strategic planning for the International Space Station
NASA Technical Reports Server (NTRS)
Griner, Carolyn S.
1990-01-01
The concept for utilization and operations planning for the International Space Station Freedom was developed in a NASA Space Station Operations Task Force in 1986. Since that time the concept has been further refined to definitize the process and products required to integrate the needs of the international user community with the operational capabilities of the Station in its evolving configuration. The keystone to the process is the development of individual plans by the partners, with the parameters and formats common to the degree that electronic communications techniques can be effectively utilized, while maintaining the proper level and location of configuration control. The integration, evaluation, and verification of the integrated plan, called the Consolidated Operations and Utilization Plan (COUP), is being tested in a multilateral environment to prove out the parameters, interfaces, and process details necessary to produce the first COUP for Space Station in 1991. This paper will describe the concept, process, and the status of the multilateral test case.
LaRC 20-Year Center Revitalization Plan
NASA Technical Reports Server (NTRS)
Mangum, Cathy H.; Harris, Charles E.; Allen, Cheryl L.; Craft, Stephen J.; Hope, Drew J.; Kegelman, Jerome T.; Mastaler, Michael D; Weiser, Erik S.
2012-01-01
LaRC has developed a 20-Year Center Revitalization Plan. The objective of this plan is to assure that the center infrastructure is sustainable for the long-term and that the center will have the essential facilities and laboratories to execute the future NASA mission. The plan was developed by a centerwide team, VITAL, and was approved by the Center Leadership Council (CLC) in March 2012. The revitalization plan will be implemented through the Center Master Planning process.
Developing clinical leadership capability.
Pintar, Kristi A; Capuano, Terry A; Rosser, Gwendolyn D
2007-01-01
Nursing facilities must be committed to ongoing leadership development and to developing and retaining their staff in the increasingly competitive healthcare market. In this article, the authors share the processes involved in creating a focused small group approach to developing clinical leaders. Programmatic approaches to development, clarity of needs of those targeted for development, individual development plans, external expertise partnerships, and small group session dynamics are discussed. Applications of the process and lessons learned from the program will benefit others in their efforts to enhance organization succession planning, leadership development, group learning, and program administration.
PLANiTS : structuring and supporting the intelligent transportation systems planning process
DOT National Transportation Integrated Search
1997-01-01
PLANiTS (Planning and Analysis Integration for Intelligent Transportation Systems) is a process-based computer system that supports a series of mutually interdependent steps progressing toward developing and programming transportation improvement pro...
Stakeholder Participation in Marine Spatial Plan Making Process in Lampung Province
NASA Astrophysics Data System (ADS)
Asirin; Asbi, A. M.; Pakpahan, V. H.
2018-05-01
Lampung Province has coastal areas, seas and small islands facing conflicts of interest between tourism, conservation areas for defense, environmental conservation, and the threat of unsustainable marine resource utilization. Indonesia (including Lampung Province) has committed itself to achieving the objectives of conservation and sustainable use of oceans, seas and marine resources in view of sustainable development. One of the instruments used to achieve this goal is by using marine spatial planning (MSP). The purpose of this research was to analyse the marine spatial plan making process in Lampung Province. This research also evaluated the participation process and participation level based on plan-making process criteria and the stakeholder participation ladder. This research can be useful as a recommendation in the evaluation step to improve the plan-making process in order to address conflicts of interest between various related interest groups, so that planning can be accomplished with the involvement of all relevant parties to reach consensus on how to achieve a sustainable marine environment. This research used a qualitative research method as well as a case study approach. The scope of this study was limited by the conceptual framework of marine spatial planning and the stakeholder participation ladder. The authors recommend study of the preparation of marine spatial planning in addition to a technocratic approach considering the results of the study aspects of spatial allocation and physical aspects of marine resources, while prioritizing building consensus among various interest groups related to the utilization of marine resources. Thus, it is necessary to develop technical steps to build consensus in the marine spatial plan-making process.
Best practices in developing regional transportation plans
DOT National Transportation Integrated Search
2001-08-01
The purpose of this study is to compare Metropolitan Planning Organization (MPO) Regional Transportation Plans (RTP) and planning processes in California with selected regions. A total of 17 MPOs were included to provide a balance of geographic locat...
Some Reflections on Strategic Planning in Public Libraries.
ERIC Educational Resources Information Center
Palmour, Vernon E.
1985-01-01
Presents the Public Library Association's planning model for strategic planning in public libraries. The development of the model is explained, the basic steps of the planning process are described, and improvements to the model are suggested. (CLB)
Significant and Basic Innovations in Urban Planning
NASA Astrophysics Data System (ADS)
Kolyasnikov, V. A.
2017-11-01
The article considers the development features of the innovative urban planning in the USSR and Russia in XVIII - XX centuries. Innovative urban planning is defined as an activity on innovations creation and their implementation to obtain a socio-economic, political, environmental or other effect. In the course of urban development history this activity represents a cyclic wave process in which there are phases of rise and fall. The study of cyclic waves in the development of innovative urban planning uses the concept of basic and epochal innovations selection. This concept was developed by scientists for the study of cyclic wave processes in economics. Its adaptation to the conditions of innovative urban planning development allows one to introduce the concept of “basic innovation” and “significant innovation” in the theory and practice of settlement formation and their systems as well as to identify opportunities to highlight these innovations in the history of Russian urban planning. From these positions, six innovation waves committed to the urban development over the past 300 years are being investigated. The observed basic innovations in the domestic urban area show that urban development is a vital area for ensuring the country’s geopolitical security. Basic innovations are translated in time and modernized under new conditions of urban planning development. In this regard, we can predict the development of four basic innovations in post-Soviet Russia.
Smessaert, A H
1992-10-01
In the late 1980s Holy Cross Health System (HCHS), South Bend, IN, began to implement a revised strategic planning and budgeting process to effectively link the system's mission with its day-to-day operations. Leaders wanted a process that would help system employees internalize and act on the four major elements articulated in the HCHS mission statement: fidelity, excellence, empowerment, and stewardship. Representatives from mission, strategic planning, and finance from the corporate office and subsidiaries examined planning and budgeting methods. From the beginning, HCHS leaders decided that the process should be implemented gradually, with each step focusing on refining methodology and improving mission integration. As the process evolved. HCHS developed a sequence in which planning preceded budgeting. The system also developed a variety of educational and collaborative initiatives to help system employees adapt to the organization's change of direction. One critical aspect of HCHS's ongoing education is an ethical reflection process that helps participants balance ethical considerations by viewing an issue from three perspectives: social vision, multiple responsibility, and self-interest.
An Interpretive Master Plan at the Museum of Fine Arts, Houston
ERIC Educational Resources Information Center
Schneider, Beth B.
2008-01-01
This case study presents the methods the staff at the Museum of Fine Arts, Houston used to develop and implement an interpretive master plan from 1996-2000. The process can be a model for other museums. Looking back a decade after the plan was developed provides insights into the role of interpretive plans as statements of goals, expressions of…
ERIC Educational Resources Information Center
Joyner, Edward T., Ed.; Ben-Avie, Michael, Ed.; Comer, James P., Ed.
2004-01-01
For more than 35 years, the Yale School Development Program (SDP) has been pioneering the Comer Process for planned change in schools. From initial planning and preparation, through foundation building, transformation, institutionalization, and renewal, the Comer Process provides school leaders with a comprehensive and effective framework for…
Using the Logic Model to Plan Extension and Outreach Program Development and Scholarship
ERIC Educational Resources Information Center
Corbin, Marilyn; Kiernan, Nancy Ellen; Koble, Margaret A.; Watson, Jack; Jackson, Daney
2004-01-01
In searching for a process to help program teams of campus-based faculty and field-based educators develop five-year and annual statewide program plans, cooperative extension administrators and specialists in Penn State's College of Agricultural Sciences discovered that the use of the logic model process can influence the successful design of…
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2013 CFR
2013-10-01
... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2014 CFR
2014-10-01
... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2012 CFR
2012-10-01
... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...
NASA Astrophysics Data System (ADS)
Hoverman, Suzanne; Ayre, Margaret
2012-12-01
SummaryIndigenous land owners of the Tiwi Islands, Northern Territory Australia have begun the first formal freshwater allocation planning process in Australia entirely within Indigenous lands and waterways. The process is managed by the Northern Territory government agency responsible for water planning, the Department of Natural Resources, Environment, The Arts and Sport, in partnership with the Tiwi Land Council, the principal representative body for Tiwi Islanders on matters of land and water management and governance. Participatory planning methods ('tools') were developed to facilitate community participation in Tiwi water planning. The tools, selected for their potential to generate involvement in the planning process needed both to incorporate Indigenous knowledge of water use and management and raise awareness in the Indigenous community of Western science and water resources management. In consultation with the water planner and Tiwi Land Council officers, the researchers selected four main tools to develop, trial and evaluate. Results demonstrate that the tools provided mechanisms which acknowledge traditional management systems, improve community engagement, and build confidence in the water planning process. The researchers found that participatory planning approaches supported Tiwi natural resource management institutions both in determining appropriate institutional arrangements and clarifying roles and responsibilities in the Islands' Water Management Strategy.
The Course Development Plan: Macro-Level Decisions and Micro-Level Processes
ERIC Educational Resources Information Center
Franker, Karen; James, Dennis
2016-01-01
A key step in distance learning project management is the creation of a course development plan. The plan should account for decisions related to materials, curriculum, delivery methods, staffing, technology applications, resources, reporting lines, and project management--issues that may require administrator involvement and support, particularly…
Steps in the open space planning process
Stephanie B. Kelly; Melissa M. Ryan
1995-01-01
This paper presents the steps involved in developing an open space plan. The steps are generic in that the methods may be applied various size communities. The intent is to provide a framework to develop an open space plan that meets Massachusetts requirements for funding of open space acquisition.
Functional Behavioral Assessments and Intervention Plans in Early Intervention Settings.
ERIC Educational Resources Information Center
LaRocque, Michelle; Brown, Sharan E.; Johnson, Kurt L.
2001-01-01
This article advocates the use of functional behavioral assessments (FBAs) and behavior intervention plans (BIPs) in the development of Individualized Family Service Plans for children with or at risk of developing behavioral disorders. It describes the FBA and BIP processes and proposes a parent collaborative model for assessment and…
Building a vision for the future: strategic planning in a shared governance nursing organization.
Baker, C; Beglinger, J E; Bowles, K; Brandt, C; Brennan, K M; Engelbaugh, S; Hallock, T; LaHam, M
2000-06-01
Today's health care delivery environment is marked by extreme turbulence and ever-increasing complexity. Now, more than ever, an organization's strategic plan must do more than outline a business plan. Rather, the strategic plan is a fundamental tool for building and sustaining an organizational vision for the future. The strong, dynamic strategic plan (1) represents a long-range vision for improving organizational performance, (2) provides a model for planning and implementing structures and processes for the management of outcomes, (3) reflects and shapes the organizational culture and customer focus, (4) provides decision support for difficult operational choices made day to day, and (5) integrates and aligns the work of the organization. This article describes the development, implementation, and evaluation of a methodology for strategic planning within a shared governance nursing organization. Built upon the strategic plan of the hospital, the process undertaken by the nursing organization reflects the following commitments: (1) to develop a strategic plan that is meaningful and part of daily work life at all levels of the nursing organization, (2) to make the plan practical and realistic through incremental building, (3) to locate and articulate accountability for each step, and (4) to build in a process for checking progress toward goal achievement and readjusting the plan as necessary.
Team table: a framework and tool for continuous factory planning
NASA Astrophysics Data System (ADS)
Sihn, Wilfried; Bischoff, Juergen; von Briel, Ralf; Josten, Marcus
2000-10-01
Growing market turbulences and shorter product life cycles require a continuous adaptation of factory structures resulting in a continuous factory planning process. Therefore a new framework is developed which focuses on configuration and data management process integration. This enable an online system performance evaluation based on continuous availability of current data. The use of this framework is especially helpful and will guarantee high cost and time savings, when used in the early stages of the planning, called the concept or rough planning phase. The new framework is supported by a planning round table as a tool for team-based configuration processes integrating the knowledge of all persons involved in planning processes. A case study conducted at a German company shows the advantages which can be achieved by implementing the new framework and methods.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, J; Lukose, R; Bronson, J
2015-06-15
Purpose: To conduct a failure mode and effects analysis (FMEA) as per AAPM Task Group 100 on clinical processes associated with teletherapy, and the development of mitigations for processes with identified high risk. Methods: A FMEA was conducted on clinical processes relating to teletherapy treatment plan development and delivery. Nine major processes were identified for analysis. These steps included CT simulation, data transfer, image registration and segmentation, treatment planning, plan approval and preparation, and initial and subsequent treatments. Process tree mapping was utilized to identify the steps contained within each process. Failure modes (FM) were identified and evaluated with amore » scale of 1–10 based upon three metrics: the severity of the effect, the probability of occurrence, and the detectability of the cause. The analyzed metrics were scored as follows: severity – no harm = 1, lethal = 10; probability – not likely = 1, certainty = 10; detectability – always detected = 1, undetectable = 10. The three metrics were combined multiplicatively to determine the risk priority number (RPN) which defined the overall score for each FM and the order in which process modifications should be deployed. Results: Eighty-nine procedural steps were identified with 186 FM accompanied by 193 failure effects with 213 potential causes. Eighty-one of the FM were scored with a RPN > 10, and mitigations were developed for FM with RPN values exceeding ten. The initial treatment had the most FM (16) requiring mitigation development followed closely by treatment planning, segmentation, and plan preparation with fourteen each. The maximum RPN was 400 and involved target delineation. Conclusion: The FMEA process proved extremely useful in identifying previously unforeseen risks. New methods were developed and implemented for risk mitigation and error prevention. Similar to findings reported for adult patients, the process leading to the initial treatment has an associated high risk.« less
Kennedy Space Center Orion Processing Team Planning for Ground Operations
NASA Technical Reports Server (NTRS)
Letchworth, Gary; Schlierf, Roland
2011-01-01
Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis
DOT National Transportation Integrated Search
2010-10-01
While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...
Strategic planning processes and financial performance among hospitals in Lebanon.
Saleh, Shadi; Kaissi, Amer; Semaan, Adele; Natafgi, Nabil Maher
2013-01-01
Strategic planning has been presented as a valuable management tool. However, evidence of its deployment in healthcare and its effect on organizational performance is limited in low-income and middle-income countries (LMICs). The study aimed to explore the use of strategic planning processes in Lebanese hospitals and to investigate its association with financial performance. The study comprised 79 hospitals and assessed occupancy rate (OR) and revenue-per-bed (RPB) as performance measures. The strategic planning process included six domains: having a plan, plan development, plan implementation, responsibility of planning activities, governing board involvement, and physicians' involvement. Approximately 90% of hospitals have strategic plans that are moderately developed (mean score of 4.9 on a 1-7 scale) and implemented (score of 4.8). In 46% of the hospitals, the CEO has the responsibility for the plan. The level of governing board involvement in the process is moderate to high (score of 5.1), whereas physician involvement is lower (score of 4.1). The OR and RPB amounted to respectively 70% and 59 304 among hospitals with a strategic plan as compared with 62% and 33 564 for those lacking such a plan. No statistical association between having a strategic plan and either of the two measures was detected. However, the findings revealed that among hospitals that had a strategic plan, higher implementation levels were associated with lower OR (p < 0.05). In an LMIC healthcare environment characterized by resource limitation, complexity, and political and economic volatility, flexibility rather than rigid plans allow organizations to better cope with environmental turbulence. Copyright © 2012 John Wiley & Sons, Ltd.
Developing a strategic human resources plan for the Urban Angel.
Owen, Susan M
2011-01-01
In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.
Supporting economic development with highway investment
DOT National Transportation Integrated Search
2015-11-01
Federal transportation regulations and law direct State and local transportation agencies to account for economic development plans in transportation planning processes. While Federal law is not prescriptive about how State and local agencies account...
A model of succession planning for mental health nurse practitioners.
Hampel, Sally; Procter, Nicholas; Deuter, Kate
2010-08-01
This paper reviews current literature on succession planning for mental health nurse practitioners (NPs) and discusses a model of succession planning that is underpinned by principals of leadership development, workforce participation and client engagement. The paper identifies succession planning as a means of managing a present and future workforce, while simultaneously addressing individual and organizational learning and practice development needs. A discussion of the processes attendant upon sustainable succession planning - collegial support, career planning and development, information exchange, capacity building, and mentoring is framed within the potential interrelationships between existing NP, developing NP and service directors and/or team managers. Done effectively and in partnership with wider clinical services, succession planning has the potential to build NP leadership development and leadership transition more broadly within mental health services.
The Intermountain West Region Waterbird Plan
Gary Ivey
2005-01-01
The planning process for the Intermountain West Region component of the North American Waterbird Conservation Plan began in November 2001. This is one of several region-specific plans being developed as part of the Waterbird Conservation for the Americas initiative (Kushlan et al. 2002), as called for in the North American Waterbird Conservation Plan. The plan...
Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger
2016-04-27
Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the implementation process of old practices, before further development of new practices or supportive tools.
Person-Centered Transition Planning.
ERIC Educational Resources Information Center
Miner, Craig A.; Bates, Paul E.
1997-01-01
Describes a person-centered planning approach for involving students with disabilities and their families in the transition planning process. Components of person-centered planning are discussed, including development of a personal profile, identification of future lifestyle preferences, action steps and responsible parties, and necessary changes…
The Architectural and Interior Design Planning Process.
ERIC Educational Resources Information Center
Cohen, Elaine
1994-01-01
Explains the planning process in designing effective library facilities and discusses library building requirements that result from electronic information technologies. Highlights include historical structures; Americans with Disabilities Act; resource allocation; electrical power; interior spaces; lighting; design development; the roles of…
40 CFR 93.107 - Relationship of transportation plan and TIP conformity with the NEPA process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... degree of specificity required in the transportation plan and the specific travel network assumed for air... development studies. Should the NEPA process result in a project with design concept and scope significantly...
Apply creative thinking of decision support in electrical nursing record.
Hao, Angelica Te-Hui; Hsu, Chien-Yeh; Li-Fang, Huang; Jian, Wen-Shan; Wu, Li-Bin; Kao, Ching-Chiu; Lu, Mei-Show; Chang, Her-Kung
2006-01-01
The nursing process consists of five interrelated steps: assessment, diagnosis, planning, intervention, and evaluation. In the nursing process, the nurse collects a great deal of data and information. The amount of data and information may exceed the amount the nurse can process efficiently and correctly. Thus, the nurse needs assistance to become proficient in the planning of nursing care, due to the difficulty of simultaneously processing a large set of information. Computer systems are viewed as tools to expand the capabilities of the nurse's mind. Using computer technology to support clinicians' decision making may provide high-quality, patient-centered, and efficient healthcare. Although some existing nursing information systems aid in the nursing process, they only provide the most fundamental decision support--i.e., standard care plans associated with common nursing diagnoses. Such a computerized decision support system helps the nurse develop a care plan step-by-step. But it does not assist the nurse in the decision-making process. The decision process about how to generate nursing diagnoses from data and how to individualize the care plans still reminds of the nurse. The purpose of this study is to develop a pilot structure in electronic nursing record system integrated with international nursing standard for improving the proficiency and accuracy of plan of care in clinical pathway process. The proposed pilot systems not only assist both student nurses and nurses who are novice in nursing practice, but also experts who need to work in a practice area which they are not familiar with.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Preston, Benjamin L; Westaway, Richard M.; Yuen, Emma J.
2011-04-01
Formal planning for climate change adaptation is emerging rapidly at a range of geo-political scales. This first generation of adaptation plans provides useful information regarding how institutions are framing the issue of adaptation and the range of processes that are recognized as being part of an adaptation response. To better understand adaptation planning among developed nations, a set of 57 adaptation plans from Australia, the United Kingdom and the United States was evaluated against a suite of 19 planning processes identified from existing guidance instruments for adaptation planning. Total scores among evaluated plans ranged from 16% of the maximum possiblemore » score to 61%, with an average of 37%. These results suggest adaptation plans are largely under-developed. Critical weaknesses in adaptation planning are related to limited consideration for non-climatic factors as well as neglect for issues of adaptive capacity including entitlements to various forms of capital needed for effective adaptation. Such gaps in planning suggest there are opportunities for institutions to make better use of existing guidance for adaptation planning and the need to consider the broader governance context in which adaptation will occur. In addition, the adaptation options prescribed by adaptation plans reflect a preferential bias toward low-risk capacity-building (72% of identified options) over the delivery of specific actions to reduce vulnerability. To the extent these findings are representative of the state of developed nation adaptation planning, there appear to be significant deficiencies in climate change preparedness, even among those nations often assumed to have the greatest adaptive capacity.« less
Kearns, Randy D; Cairns, Bruce A; Hickerson, William L; Holmes, James H
2014-01-01
The Southern Region of the American Burn Association began to craft a regional plan to address a surge of burn-injured patients after a mass casualty event in 2004. Published in 2006, this plan has been tested through modeling, exercise, and actual events. This article focuses on the process of how the plan was created, how it was tested, and how it interfaces with other ongoing efforts on preparedness. One key to success regarding how people respond to a disaster can be traced to preexisting relationships and collaborations. These activities would include training or working together and building trust long before the crisis. Knowing who you can call and rely on when you need help, within the context of your plan, can be pivotal in successfully managing a disaster. This article describes how a coalition of burn center leaders came together. Their ongoing personal association has facilitated the development of planning activities and has kept the process dynamic. This article also includes several of the building blocks for developing a plan from creation to composition, implementation, and testing. The plan discussed here is an example of linking leadership, relationships, process, and documentation together. On the basis of these experiences, the authors believe these elements are present in other regions. The intent of this work is to share an experience and to offer it as a guide to aid others in their regional burn disaster planning efforts.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... establishment's process control plans, that is, its Hazard Analysis and Critical Control Point plans. DATES... control plans, i.e., its Hazard Analysis and Critical Control Point (HACCP) plans; and (3) make the recall... systematic prevention of biological, chemical, and physical hazards. HACCP plans are establishment-developed...
Designing the Horizons of Your Small Business.
ERIC Educational Resources Information Center
Helgemo, Robert R.
This manual outlines the planning process for developing a feasibility study for a small business. The material is composed of three parts: the planning documents filled out for an imaginary campground; a business plan summarized from the planning documents; and blank planning documents with introductions and instructions. The documents can be…
7 CFR 275.16 - Corrective action planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
Plan Your Marketing: Enhance Profits and Reduce Risk.
ERIC Educational Resources Information Center
Edwards, William; And Others
This marketing unit was developed to help farm families formulate a step-by-step plan for marketing their commodities in order to help remove much of the guesswork and anxiety from the process. The unit is organized in the following eight sections: introduction; sources of risk; pricing alternatives; developing a plan (10 steps); summary;…
Institutional plan. Fiscal year, 1997--2002
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-10-01
The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.
Planning and conducting a multi-institutional project on fatigue.
Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E
1998-09-01
To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Geoffrey Wayne
2016-03-16
This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived frommore » APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.« less
A faculty created strategic plan for excellence in nursing education.
Evans, Connie Joan; Francis Shackell, Eileen; Jean Kerr-Wilson, Selma; Joan Doyle, Glynda; McCutcheon, Jodie Anita; Budz, Bernice
2014-02-08
Strategic planning for nursing education, when seen through a faculty lens creates a deeper, more meaningful critical analysis of effective program development. New strategies are required for academic institutions to transform their curricula to meet the needs of a dynamic healthcare and changing global environment to provide quality education for students. In this article, an evidence-informed process is presented that was progressively co-created by the faculty and facilitators. Seminal business frameworks, leadership development philosophies, and innovative interventions enabled faculty to become engaged and developed as they created a strategic plan for a future-driven nursing program. Phase One presents the process of developing a strategic plan for excellence in nursing education by leveraging faculty potential and preparing for an upcoming accreditation. In Phase Two, four team members from Phase One continue as part of Phase Two team serving as the collective memory for this initial work. This method of strategic planning encouraged faculty engagement and leadership and laid the groundwork for a positive culture change among nursing faculty.
Toward late career transitioning: a proposal for academic surgeons.
Richards, Robin; McLeod, Robin; Latter, David; Keshavjee, Shaf; Rotstein, Ori; Fehlings, Michael G; Ahmed, Najma; Nathens, Avery; Rutka, James
2017-09-01
In the absence of a defined retirement age, academic surgeons need to develop plans for transition as they approach the end of their academic surgical careers. The development of a plan for late career transition represents an opportunity for departments of surgery across Canada to initiate a constructive process in cooperation with the key stakeholders in the hospital or institution. The goal of the process is to develop an individual plan for each faculty member that is agreeable to the academic surgeon; informs the surgical leadership; and allows the late career surgeon, the hospital, the division and the department to make plans for the future. In this commentary, the literature on the science of aging is reviewed as it pertains to surgeons, and guidelines for late career transition planning are shared. It is hoped that these guidelines will be of some value to academic programs and surgeons across the country as late career transition models are developed and adopted.
Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition
NASA Astrophysics Data System (ADS)
Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly
2018-04-01
Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.
Recreational planning: an important component of career counseling for people with disabilities.
Devine, Mary Ann; Koch, Lynn C
2003-01-01
Participation in recreational activities is a critical component of the career development process, providing opportunities for individuals to explore their interests and to develop work-related skills. Recreational participation also offers a healthy outlet for dealing with job-related and other life stressors. People with disabilities are often excluded from participation in recreational activities because of a multitude of barriers. This exclusion can seriously impede the career development of these individuals. This article explores the importance of recreational planning as part of the vocational rehabilitation process. The authors define inclusive recreation and discuss the implications of recreational planning in the various phases of rehabilitation.
NASA Astrophysics Data System (ADS)
Nasution, Derlina; Syahreni Harahap, Putri; Harahap, Marabangun
2018-03-01
This research aims to: (1) developed a instrument’s learning (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) of physics learning through scientific inquiry learning model based Batak culture to achieve skills improvement process of science students and the students’ curiosity; (2) describe the quality of the result of develop instrument’s learning in high school using scientific inquiry learning model based Batak culture (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) to achieve the science process skill improvement of students and the student curiosity. This research is research development. This research developed a instrument’s learning of physics by using a development model that is adapted from the development model Thiagarajan, Semmel, and Semmel. The stages are traversed until retrieved a valid physics instrument’s learning, practical, and effective includes :(1) definition phase, (2) the planning phase, and (3) stages of development. Test performed include expert test/validation testing experts, small groups, and test classes is limited. Test classes are limited to do in SMAN 1 Padang Bolak alternating on a class X MIA. This research resulted in: 1) the learning of physics static fluid material specially for high school grade 10th consisted of (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) and quality worthy of use in the learning process; 2) each component of the instrument’s learning meet the criteria have valid learning, practical, and effective way to reach the science process skill improvement and curiosity in students.
Air Quality Implementation Plans
States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.
ERIC Educational Resources Information Center
Research and Planning Group for California Community Colleges (RP Group), 2005
2005-01-01
As part of the Statewide Strategic Planning Process for California Community Colleges, the Center for Student Success, the research and evaluation organization of the Research and Planning Group for California Community Colleges (RP/CSS) was asked to develop a series of overview documents that would outline both internal and external trends that…
A Case Study in Master Planning the Learning Landscape Hub Concepts for the University at Buffalo
ERIC Educational Resources Information Center
Dugdale, Shirley; Torino, Roger; Felix, Elliot
2009-01-01
This case study describes concepts for three types of learning spaces that grew out of a Learning Landscape planning process. The process was part of a master plan study for the three campuses of the University at Buffalo. It involved research into user needs and aspirations about future pedagogy, development of learning space strategy,…
Strategic Planning for Community Viability: A Process, Not a Destination. Circular CRD-60.
ERIC Educational Resources Information Center
Albertson-Zenor, Patricia; Raftery, Sue
Strategic planning (SP), which has been used since the 1960s by business and industry, is now being used by schools, municipalities, universities, and even churches. SP is a process designed to assist groups in developing a custom-designed plan to meet the specific needs of their own organization or community. The following are five important…
ERIC Educational Resources Information Center
Moallem, Mahnaz; Applefield, James
This study explored the development and processes of thinking, planning, and decision making of two preservice teachers as they progressed through their teacher education program. The effects of training in the systems approach on two preservice teachers' thinking about instruction and on their actual instructional planning documents were…
Corporate objectives and the planning process.
White, S
1990-02-01
The embodiment of corporate objectives in a workable planning process enables all employees to develop an identity larger than themselves. This results in a more cohesive body and makes it easier to implement the organization's strategy and mission. The senior executives at University Hospital have a long history with the organization and therefore know it well. Whether the new process makes planning more coordinated and comprehensive will be measured by both the subjective and the objective assessment of these executives.
Environmental scanning for Social Services.
Russell, S; Prince, M J
1992-10-01
This article describes the development of a process of systematic regional environmental scanning as part of strategic planning in the Ministry of Social Services (MSS) in British Columbia, over the 1987-1990 period. Social Services, a large regionalized social service organization, adopted a formal strategic planning process in early 1988. Ministry services are delivered in ten regions with widely varying characteristics. To ensure that this diversity is reflected in the planning process, it is essential that regional environmental information receive consideration. A simple format was developed and regional directors asked to consult with their staff and to scan their regions for issues that may impact the ministry over the medium term. The information obtained was presented by regional directors at a Senior Management Committee meeting and included in the ministry's annual Business Plan, a document which informs staff, contractors, stakeholders, and the community at large of the ministry's values, objectives, and operational goals. The inclusion of regional analyses adds useful information to the Plan. A second output of the planning process is the ministry budget. The systematic regional scans were found to be extremely useful to regional staff, other directors, and to the ministry executives while setting priorities.
Technology Transfer and the Civil Space Program. Volume 2: Workshop proceedings
NASA Technical Reports Server (NTRS)
1992-01-01
The objectives were to (1) provide a top-level review of the Integrated Technology Plan (ITP) and current civil space technology plans, including planning processes and technologies; (2) discuss and assess technology transfer (TT) experiences across a wide range of participants; (3) identify alternate categories/strategies for TT and define the objectives of transfer processes in each case; (4) identify the roles of various government 'stakeholders', aerospace industry, industries at large, and universities in civil space technology research, development, demonstration, and transfer; (5) identify potential barriers and/or opportunities to successful civil space TT; (6) identify specific needs for innovations in policy, programs, and/or procedures to facilitate TT; and (7) develop a plan of attack for the development of a workshop report. Papers from the workshop are presented.
Customizing for clients: developing a library liaison program from need to plan.
Tennant, M R; Butson, L C; Rezeau, M E; Tucker, P J; Boyle, M E; Clayton, G
2001-01-01
Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations.
Customizing for clients: developing a library liaison program from need to plan*
Tennant, Michele R.; Butson, Linda C.; Rezeau, Michelle E.; Tucker, Prudence J.; Boyle, Marian E.; Clayton, Greg
2001-01-01
Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven |primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations. PMID:11209807
Outcome-Based School-to-Work Transition Planning for Students with Severe Disabilities.
ERIC Educational Resources Information Center
Steere, Daniel E.; And Others
1990-01-01
A transition planning process that focuses on quality-of-life outcomes is presented. The process, which views employment not as an outcome but as a vehicle for the attainment of quality of life, involves six steps: orientation, personal profile development, identification of employment outcomes, measurement system, compatibility process, and…
Linking human and natural systems in the planning process
Susan I. Stewart; Miranda H. Mockrin; Roger B. Hammer
2012-01-01
Planning links human and natural systems in the urban-rural interface by engaging people in consideration of the future of natural resources. We review evolving ideas about what planning entails, who it involves, and what its outcomes should be. Sense of place, collaboration, emergent planning, and other new developments in planning are discussed. Smaller plans,...
Restructuring: A School-Based Plan of Action.
ERIC Educational Resources Information Center
Rothberg, Robert A.; Bozeman, William C.
The processes by which school leaders can institutionalize staff and organizational development, with a focus on initiating school restructuring through team development, are described. Three features are necessary for implementing school restructuring through team development: a deliberate plan for staff involvement, a positive work environment,…
23 CFR 450.306 - Scope of the metropolitan transportation planning process.
Code of Federal Regulations, 2010 CFR
2010-04-01
...: (1) Support the economic vitality of the metropolitan area, especially by enabling global... transportation improvements and State and local planned growth and economic development patterns; (6) Enhance the... transportation system development, land use, employment, economic development, human and natural environment, and...
American Historical Association Faculty Development Program: Planning and Implementation.
ERIC Educational Resources Information Center
Hoffmann, Charles
The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…
Research and development plan for the Slagging Pyrolysis Incinerator. [For TRU waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hedahl, T.G.; McCormack, M.D.
1979-01-01
Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance. (DLC)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matuszak, M; Anderson, C; Lee, C
Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less
Establishing a program of global initiatives for nursing education.
Kulage, Kristine M; Hickey, Kathleen T; Honig, Judy C; Johnson, Mary P; Larson, Elaine L
2014-07-01
In the global nursing community, schools of nursing are increasingly developing initiatives and networks across national boundaries. This article describes the process undertaken at a school of nursing to determine its global health priorities and develop a program of global initiatives for nursing education. A series of meetings were held to determine faculty global activities and gauge interest in designing a 5-year strategic plan for the program. A volunteer Strategic Planning Work-group was convened to formalize a mission, vision, and strategic plan for the program, which were presented to, refined by, and vetted by an advisory board and the faculty at large. We recommend this process to schools committed to developing or expanding a program dedicated to global initiatives and a global perspective in educational planning. Involving stakeholders, building on current strengths, and aligning with mission and vision are essential elements for developing a meaningful program of global initiatives for nursing education. Copyright 2014, SLACK Incorporated.
NASA Technical Reports Server (NTRS)
Tompkins, F. G.
1983-01-01
This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.
FHWA scenario planning guidebook
DOT National Transportation Integrated Search
2011-02-01
The purpose of this guidebook is to assist transportation agencies with carrying out a scenario planning process from start to finish. Transportation agencies can use the guidebook as a framework to develop a scenario planning approach tailored to th...
Connected vehicle impacts on transportation planning : technical memorandum #5 : case studies.
DOT National Transportation Integrated Search
2015-12-01
The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...
DOT National Transportation Integrated Search
2016-02-08
Professional development and training are essential to the incorporation of connected/automated vehicles (C/AV) into the transportation planning process. In order to guarantee a successful deployment, transportation planning agencies and their stakeh...
Rise, Marit B; Steinsbekk, Aslak
2015-10-01
Governments in several countries attempt to strengthen user participation through instructing health-care organizations to implement user participation initiatives. There is, however, little knowledge on the effect on patients' experience from comprehensive plans for enhancing user participation in whole health service organizations. To investigate whether implementing a development plan intending to enhance user participation in a mental hospital had any effect on the patients' experience of user participation. A non-randomized controlled study including patients in three mental hospitals in Central Norway, one intervention hospital and two control hospitals. A development plan intended to enhance user participation was implemented in the intervention hospital as a part of a larger reorganizational process. The plan included establishment of a patient education centre and a user office, purchase of user expertise, appointment of contact professionals for next of kin and improvement of the centre's information and the professional culture. Perceptions of Care, Inpatient Treatment Alliance Scale and questions made for this study. A total of 1651 patients participated. Implementing a development plan in a mental hospital intending to enhance user participation had no significant effect on the patients' experience of user participation. The lack of effect can be due to inappropriate initiatives or challenges in implementation processes. Further research should ensure that initiatives and implementation processes are appropriate to impact the patients' experience. © 2013 John Wiley & Sons Ltd.
NASA Astrophysics Data System (ADS)
Limatahu, I.; Sutoyo, S.; Wasis; Prahani, B. K.
2018-03-01
In the previous research, CCDSR (Condition, Construction, Development, Simulation, and Reflection) learning model has been developed to improve science process skills for pre-service physics teacher. This research is aimed to analyze the effectiveness of CCDSR learning model towards the improvement skills of creating lesson plan and worksheet of Science Process Skill (SPS) for pre-service physics teacher in academic year 2016/2017. This research used one group pre-test and post-test design on 12 pre-service physics teacher at Physics Education, University of Khairun. Data collection was conducted through test and observation. Creating lesson plan and worksheet SPS skills of pre-service physics teacher measurement were conducted through Science Process Skill Evaluation Sheet (SPSES). The data analysis technique was done by Wilcoxon t-test and n-gain. The CCDSR learning model consists of 5 phases, including (1) Condition, (2) Construction, (3) Development, (4) Simulation, and (5) Reflection. The results showed that there was a significant increase in creating lesson plan and worksheet SPS skills of pre-service physics teacher at α = 5% and n-gain average of moderate category. Thus, the CCDSR learning model is effective for improving skills of creating lesson plan and worksheet SPS for pre-service physics teacher.
NASA Astrophysics Data System (ADS)
Putra, A.; Masril, M.; Yurnetti, Y.
2018-04-01
One of the causes of low achievement of student’s competence in physics learning in high school is the process which they have not been able to develop student’s creativity in problem solving. This is shown that the teacher’s learning plan is not accordance with the National Eduction Standard. This study aims to produce a reconstruction model of physics learning that fullfil the competency standards, content standards, and assessment standards in accordance with applicable curriculum standards. The development process follows: Needs analysis, product design, product development, implementation, and product evaluation. The research process involves 2 peers judgment, 4 experts judgment and two study groups of high school students in Padang. The data obtained, in the form of qualitative and quantitative data that collected through documentation, observation, questionnaires, and tests. The result of this research up to the product development stage that obtained the physics learning plan model that meets the validity of the content and the validity of the construction in terms of the fulfillment of Basic Competence, Content Standards, Process Standards and Assessment Standards.
Basic Concepts Required in the Development of a Planning Information System.
ERIC Educational Resources Information Center
Kennedy, F. D.
This report, the result of developmental research on a planning information system for North Carolina, describes the planning process at higher levels of State government, defines a general information system and derives a planning information system from various types of planning, provides guidelines for system design and evaluation, and…
36 CFR 1010.4 - NEPA Compliance Coordinator.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Develop procedures within the Trust's planning and decision-making processes to ensure that environmental... and documentation of the environmental aspects of the Trust's planning and decision-making processes... decisions of the NEPA Compliance Coordinator in accordance with the Trust's regulations and procedures. (b...
Development of Planning Behaviour and Decision Making Ability of Children
ERIC Educational Resources Information Center
Mahapatra, Shamita
2016-01-01
Decision making, a complex mental activity underlying the act of choosing from among the alternatives in attaining a goal constitutes the core component of planning, a higher order cognitive process as per the PASS theory of intelligence. An attempt, therefore, has been made in the present study to examine the development of planning behaviour in…
An Education and Development Program for Michigan's State Health Planning Advisory Council.
ERIC Educational Resources Information Center
Michigan State Office of Health and Medical Affairs, Lansing.
The report describes a Federally supported education and development program conducted during the 1973-74 fiscal year for members of the Michigan State Health Planning Advisory Council. The program sought to increase: (1) the council members' awareness of and insight into the comprehensive health planning process, (2) their knowledge of the health…
Community wildfire protection planning: is the Healthy Forests Restoration Act's vagueness genius?
Pamela J. Jakes; Kristen C. Nelson; Sherry A. Enzler; Sam Burns; Antony S. Cheng; Victoria Sturtevant; Daniel R. Williams; Alexander Bujak; Rachel F. Brummel; Stephanie Grayzeck-Souter; Emily Staychock
2011-01-01
The Healthy Forests Restoration Act of 2003 (HFRA) encourages communities to develop community wildfire protection plans (CWPPs) to reduce their wildland fire risk and promote healthier forested ecosystems. Communities who have developed CWPPs have done so using many different processes, resulting in plans with varied form and content. We analysed data from 13 case-...
A Planning Approach for Developing Inventory and Monitoring Programs In National Parks
David L. Peterson; David G. Silsbee; Daniel L. Schmoldt
1995-01-01
This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...
ERIC Educational Resources Information Center
Morrison, James L.; And Others
The use of futures research to improve a college's ability to deal with changes brought about by social, economic, political, and technological developments is discussed, with attention to new planning strategies and forecasting methods. While traditional long-range planning tracks and forecasts the institution's internal development, strategic…
Community wildfire protection plans: enhancing collaboration and building scoial capacity
Daniel R. Williams; Pamela J. Jakes; Sam Burns; Antony Cheng
2009-01-01
The Healthy Forest Restoration Act of 2003 (HFRA) was enacted to reduce wildfire risk to communities and other at-risk lands through a collaborative process of planning, prioritizing and implementing hazardous fuel reduction projects. One of the key features of HFRA is the development of community wildfire protection plans (CWPPs). We studied the development of CWPPs...
ERIC Educational Resources Information Center
New York State Education Dept., Albany. Div. of Elementary and Secondary Education Planning.
Designed to provide assistance to school district personnel who seek to develop a plan for information management and related applications of technology, this guide presents the School District Information Study (SDIS) model for the review of management policies, procedures, and activities related to information processing done by school district…
The Adult Education Teacher's Role in Career Planning. Overview. ERIC Digest No. 55.
ERIC Educational Resources Information Center
Imel, Susan
Because career development is a lifelong process, adults frequently need career planning assistance. The adult education classroom is a natural environment for individuals to seek and receive help with career planning. Given the heterogeneity of the adult population, the career development needs of adults vary widely. While many adults only need…
NASA Technical Reports Server (NTRS)
Smith, Philip J.; Mccoy, C. Elaine
1991-01-01
The goals of this research were to develop design concepts to support the task of enroute flight planning. And within this context, to explore and evaluate general design concepts and principles to guide the development of cooperative problem solving systems. A detailed model is to be developed of the cognitive processes involved in flight planning. Included in this model will be the identification of individual differences of subjects. Of particular interest will be differences between pilots and dispatchers. The effect will be studied of the effect on performance of tools that support planning at different levels of abstraction. In order to conduct this research, the Flight Planning Testbed (FPT) was developed, a fully functional testbed environment for studying advanced design concepts for tools to aid in flight planning.
Care plans and care planning in long-term conditions: a conceptual model.
Burt, Jenni; Rick, Jo; Blakeman, Thomas; Protheroe, Joanne; Roland, Martin; Bower, Pete
2014-10-01
The prevalence and impact of long-term conditions continues to rise. Care planning for people with long-term conditions has been a policy priority for chronic disease management in a number of health-care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between 'care planning' (the process by which health-care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a 'care plan' (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health-care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans.
Long-Range Planning Can Improve the Efficiency of Agricultural Research and Development.
1981-07-24
planning is not done » Conclusions Recommendat ion Agency comments ADVISORY BODIES HAVE HAD MIXED SUCCESS IN AFFECTING LONG-RANGE PLANNING... kfc r Their efforts have more impact on determining priorities for the short-range budgeting cycle rather than influencing development of long...cultural products, (2) developing an efficient marketing and processing system, (3) conserving natural resources, and (4) im- proving the well-being of
The Integration of English Language Development and Science Instruction in Elementary Classrooms
NASA Astrophysics Data System (ADS)
Zwiep, Susan Gomez; Straits, William J.; Stone, Kristin R.; Beltran, Dolores D.; Furtado, Leena
2011-12-01
This paper explores one district's attempt to implement a blended science and English Language Development (ELD) elementary program, designed to provide English language learners opportunities to develop proficiency in English through participation in inquiry-based science. This process resulted in blended program that utilized a combined science/ELD lesson plan format to structure and guide teachers' efforts to use science as the context for language development. Data, collected throughout the first 2 years of the program, include teacher-generated lesson plans, observation notes, and interviews with teachers and principals. The process by which the blended program was developed, the initial implementation of the program, the resulting science/ELD lesson plan format, and teachers' perceptions about the program and its impact on their students are described.
Planning a graduate programme in public health nutrition for experienced nutrition professionals.
Fox, Ann; Beyers, Joanne
2011-08-01
Public health renewal in Canada has highlighted the need for development and expansion of the public health nutrition workforce, particularly in northern and rural communities. The purpose of the present paper is to describe the planning of a more accessible graduate programme for experienced nutrition professionals. The planning effort was challenged by a short timeframe between programme approval and implementation and required intense collaboration with stakeholders and students. The programme planning model developed by The Health Communication Unit (THCU) at the Centre for Health Promotion was used to guide the process. This six-step model was familiar to key stakeholders and involved pre-planning, conducting a situational assessment, establishing goals and objectives, developing strategies and outcome indicators, and monitoring feedback. Resource constraints, short timelines and debates around distance education options presented challenges that were overcome by conducting a thorough needs assessment, creating an advisory committee, engaging key stakeholders in the planning process, and building on existing resources. Extensive involvement of the first cohort of students in ongoing planning and evaluation was particularly helpful in informing the evolution of the programme. The THCU planning model provided a useful framework for stakeholder collaboration and for planning and implementing the new graduate programme in public health nutrition. Preliminary data suggest that graduates are benefiting from their educational experiences through career enhancement opportunities. The evaluation strategies built into the programme design will be useful in informing ongoing programme development.
Planning Systems for Distributed Operations
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.
ERIC Educational Resources Information Center
Matuszak, Trish; And Others
This guide was developed to provide an overview of the major elements of the transition planning process from school to the adult system of supports and services for youth with developmental disabilities and their families. The workbook format is intended to enable families to be proactive at each stage of the planning process. Initial sections…
24 CFR 791.404 - Field Office allocation planning.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Field Office allocation planning... Allocation of Budget Authority for Housing Assistance § 791.404 Field Office allocation planning. (a) General objective. The allocation planning process should provide for the equitable distribution of available budget...
The Clinical Learning Spiral: A Model to Develop Reflective Practitioners.
ERIC Educational Resources Information Center
Stockhausen, Lynette
1994-01-01
The Clinical Learning Spiral incorporates reflective processes into undergraduate nursing education. It entails successive cycles of four phases: preparative (briefing, planning), constructive (practice development), reflective (debriefing), and reconstructive (planning for change and commitment to action). (SK)
DOT National Transportation Integrated Search
2017-01-01
This project aimed to improve coordination and : cooperation among various entities in the : planning process for developing safer and more : efficient connections between intermodal : facilities and the highway network. Coordination : and cooperatio...
A Technological Teacher Education Program Planning Model.
ERIC Educational Resources Information Center
Hansen, Ronald E.
1993-01-01
A model for technology teacher education curriculum has three facets: (1) purpose (experiential learning, personal development, technological enlightenment, economic well-being); (2) content (professional knowledge, curriculum development competence, pedagogical knowledge and skill, technological foundations); and (3) process (planned reflection,…
The role of science in wilderness planning: a state-of-knowledge review
Edwin E. Krumpe
2000-01-01
Wilderness planning has evolved since the Wilderness Act of 1964 in an atmosphere of intense debate and public scrutiny. Wilderness planning and the role science has played in developing the planning process has been influenced by many complex legal mandates, by thorny social issues, and by emerging planning paradigms. Wilderness planning has at times been inspired by...
PDSS configuration control plan and procedures
NASA Technical Reports Server (NTRS)
1983-01-01
The payload development support system (PDSS) configuration control plan and procedures are presented. These plans and procedures establish the process for maintaining configuration control of the PDSS system, especially the Spacelab experiment interface device's (SEID) RAU, HRM, and PDI interface simulations and the PDSS ECOS DEP Services simulation. The plans and procedures as specified are designed to provide a simplified but complete configuration control process. The intent is to require a minimum amount of paperwork but provide total traceability of PDSS during experiment test activities.
Toward a space materials systems program
NASA Technical Reports Server (NTRS)
Vontiesenhausen, G. F.
1981-01-01
A program implementation model is presented which covers the early stages of space material processing and manufacturing. The model includes descriptions of major program elements, development and experiment requirements in space materials processing and manufacturing, and an integration of the model into NASA's long range plans as well as its evolution from present Materials Processing in Space plans.
Louisiana's 2017 Master Plan for a Sustainable Coast
NASA Astrophysics Data System (ADS)
Haase, B.
2017-12-01
The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement
ITS Early Deployment Study, Richmond/ Tri-Cities Area, User Service Plan
DOT National Transportation Integrated Search
1996-05-01
">THE ESSENCE OF THE ITS PLANNING PROCESS IS TO DEVELOP EACH ITS PROGRAM ON THE BASIS OF THE NEEDS OF THE USERS AND OPERATORS OF THE TRANSPORTATION FACILITIES. ALTHOUGH THE PROCESS IS THE SAME NATIONWIDE, THE RESULTS ARE CUSTOMIZED IN EACH COMMUNITY ...
Development and Evaluation of an Intuitive Operations Planning Process
2006-03-01
designed to be iterative and also prescribes the way in which iterations should occur. On the other hand, participants’ perceived level of trust and...16 4. DESIGN AND METHOD OF THE EXPERIMENTAL EVALUATION OF THE INTUITIVE PLANNING PROCESS...20 4.1.3 Design
NASA Procurement Career Development Program
NASA Technical Reports Server (NTRS)
1987-01-01
The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.
Strategic planning in an academic radiation medicine program.
Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F
2017-12-01
In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.
Strategic planning in an academic radiation medicine program
Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.
2017-01-01
Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061
Community-based assessment and planning of energy futures
NASA Astrophysics Data System (ADS)
Carnes, S. A.
1981-04-01
The decentralized solar energy technology assessment program is discussed. Four communities were involved in an assessment of the compatibility of diverse conservation and renewable energy supply technologies and community values and goals and in community planning for the implementation of compatible energy demand and supply alternatives. The community approach has several basic components: (1) recruiting and organizing for the assessment planning process; (2) collection and analysis of data related to community energy use and indigenous renewable energy resources; (3) creation and maintenance of a community education and information program; (4) development of policies favorable to the development of preferred community futures; and (5) development of implementation or action strategies. The role of public participation, group decision making techniques, the role of technical information in citizen and group decision making, and linkage between assessment planning and the relevant policy process are emphasized.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wirutskulshai, Uma, E-mail: st104686@ait.ac.th; Sajor, Edsel, E-mail: esajor@ait.ac.th; Coowanitwong, Nowarat
Following the example of other developed countries, strategic environmental assessment (SEA) tool is now being introduced in developing countries, with the expectations, among others, that it will influence decision-making process in planning, and also usher in the participatory and collaborative planning towards a more sustainable track in development. This article examines Thailand's own recent introduction of SEA. The authors underscore the particularity of the Thai planning context as well as the broader governance structure and processes in the country as the critical factor influencing the extent, substance and form of adoption of SEA. Top-down tradition of planning and serious limitationmore » of public participation opportunity structures and institutional culture have minimized the tool's positive impact and influence in development planning. Thailand's experience in SEA introduction thus reaffirms the important lesson from a number of other developing countries: that legal framework for SEA is necessary and critical especially in its initial adoption; and, that public participation needs to be supported too and institutionalized for the tool to fulfill its promise of improving environmental governance and optimizing potentials of development projects vis-a-vis various social and environmental concerns.« less
Planning for the semiconductor manufacturer of the future
NASA Technical Reports Server (NTRS)
Fargher, Hugh E.; Smith, Richard A.
1992-01-01
Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.
Tsuru, Satoko; Wako, Fumiko; Omori, Miho; Sudo, Kumiko
2015-01-01
We have identified three foci of the nursing observation and nursing action respectively. Using these frameworks, we have developed the structured knowledge model for a number of diseases and medical interventions. We developed this structure based NursingNAVI® contents collaborated with some quality centered hospitals. Authors analysed the nursing care documentations of post-gastrectomy patients in light of the standardized nursing care plan in the "NursingNAVI®" developed by ourselves and revealed the "failure to observe" and "failure to document", which leaded to the volatility of the patients' data, conditions and some situation. This phenomenon should have been avoided if nurses had employed a standardized nursing care plan. So, we developed thinking process support system for planning, delivering, recording and evaluating in daily nursing using NursingNAVI® contents. A hospital decided to use NursingNAVI® contents in HIS. It was suggested that the system has availability for nursing OJT and time reduction of planning and recording without volatilizing situation.
Policy implications in developing a land use management information systems
NASA Technical Reports Server (NTRS)
Landini, A. J.
1975-01-01
The current land use map for the city of Los Angeles was developed by the guesstimation process and provides single stage information for each level in the critical geographical hierarchy for land use planning management. Processing and incorporation of LANDSAT data in the land use information system requires special funding; however, computergraphic maps are able to provide a viable information system for city planning and management.
SWiFT Software Quality Assurance Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berg, Jonathan Charles
This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan
Application of genetic algorithm in integrated setup planning and operation sequencing
NASA Astrophysics Data System (ADS)
Kafashi, Sajad; Shakeri, Mohsen
2011-01-01
Process planning is an essential component for linking design and manufacturing process. Setup planning and operation sequencing is two main tasks in process planning. Many researches solved these two problems separately. Considering the fact that the two functions are complementary, it is necessary to integrate them more tightly so that performance of a manufacturing system can be improved economically and competitively. This paper present a generative system and genetic algorithm (GA) approach to process plan the given part. The proposed approach and optimization methodology analyses the TAD (tool approach direction), tolerance relation between features and feature precedence relations to generate all possible setups and operations using workshop resource database. Based on these technological constraints the GA algorithm approach, which adopts the feature-based representation, optimizes the setup plan and sequence of operations using cost indices. Case study show that the developed system can generate satisfactory results in optimizing the setup planning and operation sequencing simultaneously in feasible condition.
Sudore, Rebecca L.; Stewart, Anita L.; Knight, Sara J.; McMahan, Ryan D.; Feuz, Mariko; Miao, Yinghui; Barnes, Deborah E.
2013-01-01
Introduction Advance directives have traditionally been considered the gold standard for advance care planning. However, recent evidence suggests that advance care planning involves a series of multiple discrete behaviors for which people are in varying stages of behavior change. The goal of our study was to develop and validate a survey to measure the full advance care planning process. Methods The Advance Care Planning Engagement Survey assesses “Process Measures” of factors known from Behavior Change Theory to affect behavior (knowledge, contemplation, self-efficacy, and readiness, using 5-point Likert scales) and “Action Measures” (yes/no) of multiple behaviors related to surrogate decision makers, values and quality of life, flexibility for surrogate decision making, and informed decision making. We administered surveys at baseline and 1 week later to 50 diverse, older adults from San Francisco hospitals. Internal consistency reliability of Process Measures was assessed using Cronbach's alpha (only continuous variables) and test-retest reliability of Process and Action Measures was examined using intraclass correlations. For discriminant validity, we compared Process and Action Measure scores between this cohort and 20 healthy college students (mean age 23.2 years, SD 2.7). Results Mean age was 69.3 (SD 10.5) and 42% were non-White. The survey took a mean of 21.4 minutes (±6.2) to administer. The survey had good internal consistency (Process Measures Cronbach's alpha, 0.94) and test-retest reliability (Process Measures intraclass correlation, 0.70; Action Measures, 0.87). Both Process and Action Measure scores were higher in the older than younger group, p<.001. Conclusion A new Advance Care Planning Engagement Survey that measures behavior change (knowledge, contemplation, self-efficacy, and readiness) and multiple advance care planning actions demonstrates good reliability and validity. Further research is needed to assess whether survey scores improve in response to advance care planning interventions and whether scores are associated with receipt of care consistent with one's wishes. PMID:24039772
Care plans and care planning in long term conditions: a conceptual model
Burt, J; Rick, J; Blakeman, T; Protheroe, J; Roland, M; Bower, P
2013-01-01
The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority for chronic disease management in a number of health care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between ‘care planning’ (the process by which health care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a ‘care plan’ (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans. PMID:23883621
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
A Call for Strategic Planning: The Two-Year College Imperative.
ERIC Educational Resources Information Center
Masoner, David J.; Essex, Nathan, L.
1987-01-01
Addresses the imperative for strategic and tactical planning to support the viability of the two-year college. Describes a process for approaching strategic planning, comprising the following steps: self-identification, self-analysis, analysis of service area, informed decision making, and the development of a marketing plan. (CBC)
PLANNING THE ELEMENTARY SCHOOL PLANT. SCHOOL PLANT PLANNING SERIES.
ERIC Educational Resources Information Center
Utah State Board of Education, Salt Lake City.
CAREFUL PLANNING FOR THE ELEMENTARY SCHOOL MAXIMIZES THE USE OF SPACE TO PROVIDE CHILDREN WITH FREQUENT CHANGES IN ACTIVITY AND A WIDE VARIETY OF EXPERIENCES. IN THE PLANNING PROCESS, SPECIAL CONSIDERATION IS GIVEN TO LONG RANGE DEVELOPMENT THUS PREVENTING OVERBUILDING AND UNDERBUILDING. THE PLANT SHOULD FIT, THROUGH INCREASING UTILITY BY…
Solid Waste Management Planning--A Methodology
ERIC Educational Resources Information Center
Theisen, Hilary M.; And Others
1975-01-01
This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
Planning Alcoholism Services; Participant Workbook.
ERIC Educational Resources Information Center
National Inst. on Alcohol Abuse and Alcoholism (DHEW/PHS), Rockville, MD.
This workbook is designed to build or improve the basic planning skills needed by persons responsible for program planning in alcohol service agencies. An understanding of the generic planning process in the development or expansion of community alcoholism-realted services can be acquired through the use of this guide. The workbook attempts to…
Action Research to Support the Sustainability of Strategic Planning
ERIC Educational Resources Information Center
Antheil, Jane H.; Spinelli, Stephen, Jr.
2011-01-01
This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…
How Strategic Planning Keeps You Sane when Delivering Distance Programs
ERIC Educational Resources Information Center
MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya
2010-01-01
This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…
Developing a strategic plan for a neonatal nurse practitioner service.
Lee, Laurie A; Jones, Luann R
2004-10-01
Neonatal nurse practitioners (NNPs) have been in practice for over 3 decades. More recently, NNPs have begun to take ownership for building their group practice models. The purpose of this article is to present a detailed case study demonstrating how one NNP group used a 4-phase strategic planning process to turn a crisis into an opportunity. The article describes data obtained during the strategic planning process from an informal national survey of NNP managers that focused on key benchmarks, such as role definition, responsibilities, protected nonclinical time, NNP salary and benefits, and educational and professional development support. Using the strategic planning process, the group defined mutually agreed upon minimum safe staffing levels for NNPs, interns, residents and neonatologists in their setting. Based on the data generated, the group successfully justified additional NNP positions and organizational support for 10% protected nonclinical time. A sample operational budget, comparison of 3 staffing scenarios, and a timeline are also provided.
DOT National Transportation Integrated Search
2014-08-06
This white paper provides a review of research and current practices of integrating economic development goals in metropolitan area transportation planning. The information presented is intended to serve as a technical resource for transportation pla...
ERIC Educational Resources Information Center
Roth, Gene L.; And Others
1984-01-01
Four colleagues at Idaho State University describe how they used the DACUM (Developing A Curriculum) process to figure out what microcomputer competencies vocational educators need. Competencies include developing a personal plan for microcomputer competency; integrating computer-based instruction (CBI) into the vocational curriculum; planning,…
National Program Plan for Research and Development in Solar Heating and Cooling. Interim Report.
ERIC Educational Resources Information Center
Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.
This report presents the Energy Research and Development Administration (ERDA) program plan for solar heating and cooling of buildings and for agricultural and industrial process applications. An overview of the program plan is followed by a description of the ten paths to the solar heating and cooling of buildings and a brief discussion of the…
Using community-based evidence for decentralized health planning: insights from Maharashtra, India.
Shukla, Abhay; Khanna, Renu; Jadhav, Nitin
2018-01-01
Health planning is generally considered a technical subject, primarily the domain of health officials with minimal involvement of community representatives. The National Rural Health Mission launched in India in 2005 recognized this gap and mandated mechanisms for decentralized health planning. However, since planning develops in the context of highly unequal power relations, formal spaces for participation are necessary but not sufficient. Hence a project on capacity building for decentralized health planning was implemented in selected districts of Maharashtra, India during 2010-13. This process developed on the platform of officially supported community-based monitoring and planning, a process for community feedback and participation towards health system change. A specific project on capacity building for decentralized planning included a structured learning course and workshops for major stakeholders. An evaluation of the project, including in-depth interviews of various participants and analysis of change in local health planning processes, revealed positive changes in intervention areas, including increased capacity of key stakeholders leading to preparation of evidence-based, innovative planning proposals, significant community oriented changes in utilization of health facility funds, and inclusion of community-based proposals in village, health facility-based block and district plans. Transparency related to planning increased along with responsiveness of health providers to community suggestions. A key lesson is that active facilitation of decentralized health planning and influencing the health system to expand participation, are essential to ensure changes in planning. Effective strategies included: identifying people's health service related priorities through community-based monitoring, capacity building of diverse stakeholders regarding local health planning, and advocacy to enable participation of community-based actors in the planning process. This combination of strategies draws upon the framework of 'empowered participatory governance' which necessitates combining a degree of 'countervailing power' and acceptance of participation by the system, for new forms of governance to emerge. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.
Li, Nan; Zarepisheh, Masoud; Uribe-Sanchez, Andres; Moore, Kevin; Tian, Zhen; Zhen, Xin; Graves, Yan Jiang; Gautier, Quentin; Mell, Loren; Zhou, Linghong; Jia, Xun; Jiang, Steve
2013-12-21
Adaptive radiation therapy (ART) can reduce normal tissue toxicity and/or improve tumor control through treatment adaptations based on the current patient anatomy. Developing an efficient and effective re-planning algorithm is an important step toward the clinical realization of ART. For the re-planning process, manual trial-and-error approach to fine-tune planning parameters is time-consuming and is usually considered unpractical, especially for online ART. It is desirable to automate this step to yield a plan of acceptable quality with minimal interventions. In ART, prior information in the original plan is available, such as dose-volume histogram (DVH), which can be employed to facilitate the automatic re-planning process. The goal of this work is to develop an automatic re-planning algorithm to generate a plan with similar, or possibly better, DVH curves compared with the clinically delivered original plan. Specifically, our algorithm iterates the following two loops. An inner loop is the traditional fluence map optimization, in which we optimize a quadratic objective function penalizing the deviation of the dose received by each voxel from its prescribed or threshold dose with a set of fixed voxel weighting factors. In outer loop, the voxel weighting factors in the objective function are adjusted according to the deviation of the current DVH curves from those in the original plan. The process is repeated until the DVH curves are acceptable or maximum iteration step is reached. The whole algorithm is implemented on GPU for high efficiency. The feasibility of our algorithm has been demonstrated with three head-and-neck cancer IMRT cases, each having an initial planning CT scan and another treatment CT scan acquired in the middle of treatment course. Compared with the DVH curves in the original plan, the DVH curves in the resulting plan using our algorithm with 30 iterations are better for almost all structures. The re-optimization process takes about 30 s using our in-house optimization engine.
Exploring the relationship between planning and procurement in Western U.S. electric utilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carvallo Bodelon, Juan Pablo; Sanstad, Alan H.; Larsen, Peter H.
Integrated resource planning (IRP) is an important regulatory process used in many U.S. states to formulate and evaluate least-cost and risk-assessed portfolios to meet future load requirements for electric utilities. In principle, effective implementation of IRP seeks to assure regulators and the public that utility investment decisions, given uncertainty, are as cost-effective as possible. However, to date, there is no empirical assessment on the effectiveness of IRP implementation. In this analysis, we compare planning, procurement processes and actual decisions for a sample of twelve load serving entities (LSEs) across the Western U. S. from 2003-2014. The 2008/2009 recession provides amore » unique “stress test” to the planning process and offers an excellent opportunity to trace how procurement decisions responded to this largely unforeseen event. In aggregate, there is a general alignment between planned and procured supply-side capacity. However, there are significant differences in the choice of supply-side resources and type of ownership for individual LSEs. We develop case studies for three LSEs and find that subsequent plans differ significantly due to changes in the planning environment and that procurement decisions in some cases are impacted by factors that are not accounted for in the planning process. Our results reveal that a limited amount of information produced during the long-term planning process (e.g., forecasts, methods, and least cost/risk portfolios) are ultimately used during the procurement process, and that the latter process relies extensively on the most recent information available for decision making. These findings suggest that states' IRP rules and regulations mandating long-term planning horizons with the same analytical complexity throughout the planning period may not create useful information for the procurement process. The social value of a long-term planning process that departs from procurement and the balance between transparency and complexity of the planning and procurement processes is an open question.« less
ITS/CVO strategic & business plan for the state of Georgia
DOT National Transportation Integrated Search
1998-05-01
This document records the State of Georgias strategic and tactical plans for employing ITS/CVO technology to improve its Commercial Vehicle Administration (CVA) functions. The process by which this plan was developed included a detailed assessment...
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
NASA Astrophysics Data System (ADS)
KP, R. M. Bambang Setyohadi; Wicaksono, Dimas
2018-03-01
The poverty is one of the prevailing problems in Indonesia until now. Even a change of the era of governance has not succeeded in eradicating the problem of poverty. The program of poverty alleviation program has always been a focus in the budget allocation in all era of leadership in Indonesia. Those programs were strategic because it prepared the foundation of community self-reliance in the form of representative, entrenched and conducive community leadership institutions to develop of social capital of society in the future. Developing an area of the village requires an integrated planning (Grand Design) to figure out the potential and the problems existing in the rural area as well as the integration of the rural area surrounding. In addition, the grand design needs to be synchronized to the more comprehensive spatial plan with a hierarchical structure such as RTBL, RDTRK / RRTRK, RTRK, and RTRW. This rural area management plan can be oriented or refer to the pattern developed from neighborhood Development program which is part of the PNPM Mandiri program. The neighborhood development program is known as residential area development plan whose process involves of the entire community. Therefore, the regional development up to the scale of the environment requires the planning phase. Particularly, spatial planning which emphasizes the efforts to optimize sectorial development targets to be integrated into an integrated development process must be conducted, in addition to taking into consideration the opportunities, potentials and limitations of the resources, the level of interconnection with the central government within the district and between sub-districts and rural areas.
Integrated flexible manufacturing program for manufacturing automation and rapid prototyping
NASA Technical Reports Server (NTRS)
Brooks, S. L.; Brown, C. W.; King, M. S.; Simons, W. R.; Zimmerman, J. J.
1993-01-01
The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.
Pamela Jakes; Sam Burns; Antony Cheng; Emily Saeli; Kristen Nelson Rachel Brummel; Stephanie Grayzeck; Victoria Sturtevant; Daniel Williams
2007-01-01
Community wildfire protection plans (CWPPs) are being developed and implemented in communities across the United States. In a series of case studies, researchers found that the process of developing a CWPP can lead to benefits beyond those associated with fuels reduction, including enhancing social networks, developing learning communities, and building community...
Child Health and Human Development: An Overview and Strategy for a Five-Year Research Plan.
ERIC Educational Resources Information Center
National Inst. of Child Health and Human Development (NIH), Bethesda, MD.
The first five-year research plans developed by the National Institute of Child Health and Human Development (NICHD), covering fiscal years 1983-1987 and 10 program areas, are published in this volume. Present knowledge is reviewed and research opportunities are indicated in the areas of reproduction, fetal development, the birth process, the…
Strategic facility planning improves capital decision making.
Reeve, J R
2001-03-01
A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.
NASA Astrophysics Data System (ADS)
Groves, D.
2014-12-01
After the devastating 2005 hurricane season, Louisiana embarked on an ambitious and daunting effort to develop and implement a comprehensive Coastal Master Plan. The Master Plan sought to achieve two key goals simultaneously: reduce hurricane flood risk and halt the net conversion of its coastal landscape to open ocean. Numerous prior efforts to achieve these goals had been tried without significant success. In 2012, however, the Louisiana Coastal Protection and Restoration Authority (CPRA) produced a 50-year, $50 billion Master Plan. It had broad support from a diverse and often adversarial set of stakeholders, and it was unanimously passed by the Louisiana legislature. In contrast to other efforts, CPRA took an approach to planning called by the U.S. National Research Council as "deliberation with analysis". Specifically, CPRA used data, models, and decision support tools not to define an optimal or best strategy, but instead to support stakeholder dialogue and deliberations over alterative coastal management strategies. RAND researchers, with the support of CPRA and other collaborators, developed the planning tool at the center of this process. The CPRA planning tool synthesized large amounts of information about how the coast might evolve over time with and without different combinations of hundreds of different projects and programs. The tool helped CPRA propose alternative strategies that could achieve the State's goals while also highlighting to stakeholders the key tradeoffs among them. Importantly, this process helped bring diverse communities together to support a single vision and specific set of projects and programs to meet many of Louisiana's coastal water resources challenges. This presentation will describe the planning approach and decision support tools developed to support the Master Plan's participatory stakeholder process. The presentation will also highlight several important key takeaway messages that have broad applicability to other water resources planning efforts. Lastly, it will describe several on-going efforts in other parts of the U.S. that are employing this same approach.
CQI: using the Hoshin planning system to design an orientation process.
Platt, D; Laird, C
1995-01-01
The Hoshin planning system, developed in Japan after World War II, includes management tools intended specifically for planning new processes. There are seven tools, which can be used individually or in any combination: affinity diagrams, interrelationship digraphs, systematic diagrams, matrix diagrams, process decision program charts, arrow diagrams and prioritization matrices. The radiology department at Carson-Tahoe Hospital formed a CQI team to improve the training of front office clerks. The team quickly discovered that a new orientation program was needed and decided to use Hoshin tools to create one. Using the tools, the team identified and prioritized all relevant factors, described specific tasks needed to complete the planning process and how long each would take, anticipated problems, and assigned areas of responsibility to members of the team. Each time the team grew weary or discouraged, the clarity and organization afforded by the tools helped them feel productive and in control of the process. The team was amazed at the creative ideas they generated through this 3-month-long process. Not only did they develop and implement a new orientation program, they also cultivated a stronger sense of pride and confidence in their work and each other.
The Building Wellness project: a case history of partnership, power sharing, and compromise.
Jones, Drew; Franklin, Charla; Butler, Brittany T; Williams, Pluscedia; Wells, Kenneth B; Rodríguez, Michael A
2006-01-01
The Institute of Medicine has recommended development of community-focused strategies to alleviate the disproportionate burden of illness on minorities, including depression. So far, limited data exist on the process of developing such partnerships within diverse racial/ethnic environments as they strive to develop community-driven, evidence-based action plans to improve the quality of outreach services. We describe such an effort around depression in south Los Angeles and explore the issues of the process in the hopes of informing future partnership development. Community meetings, presentations, feedback, discussion groups, and consensus-based action items were implemented over an 18-month period. A writing subcommittee was designated to develop a description of the group's work and process, as well as the diverse perspectives in the partnership. Data sources included meeting minutes, materials for members and community feedback presentations, scribe notes, and the reflections of the authors. Development was seen on the formal group level, in the process, and on the realization of three categories of action plans. Designed to assist social service caseworkers in the recognition of and referral for depression, the action plans included developing a website, a tool kit (modified Delphi process), and a one-page depression "fact sheet" with region-specific referrals. Through the process of developing a means to combat depression in a racially/ ethnically diverse population, the community is not only better informed about depression but has become a true partner with the academic element in adapting these programs for local service providers, resulting in improved understanding of the partnership process.
Transportation improvement program : Richland, Ohio : fiscal year 1997-2000
DOT National Transportation Integrated Search
1996-06-01
As part of the Urban Transportation Planning Process, under the Federal Planning regulations (Title 23 U.S.C. and Title 49 U.S.C.), the Metropolitan Planning Organization (MPO) is required to develop and keep current a Transportation Improvement Prog...
PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
76 FR 77300 - Alaska Federal Lands Long Range Transportation Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-12
... of and actions for coordinated planning and decision making among federal land management agencies... consolidate efforts through long-term coordination in transportation planning and decision-making processes... implementing projects; facilitating objective decision making for the transportation system; and developing...
Importance of joint efforts for balanced process of designing and education
NASA Astrophysics Data System (ADS)
Mayorova, V. I.; Bannova, O. K.; Kristiansen, T.-H.; Igritsky, V. A.
2015-06-01
This paper discusses importance of a strategic planning and design process when developing long-term space exploration missions both robotic and manned. The discussion begins with reviewing current and/or traditional international perspectives on space development at the American, Russian and European space agencies. Some analogies and comparisons will be drawn upon analysis of several international student collaborative programs: Summer International workshops at the Bauman Moscow State Technical University, International European Summer Space School "Future Space Technologies and Experiments in Space", Summer school at Stuttgart University in Germany. The paper will focus on discussion about optimization of design and planning processes for successful space exploration missions and will highlight importance of the following: understanding connectivity between different levels of human being and machinery; simultaneous mission planning approach; reflections and correlations between disciplines involved in planning and executing space exploration missions; knowledge gained from different disciplines and through cross-applying and re-applying design approaches between variable space related fields of study and research. The conclusions will summarize benefits and complications of applying balanced design approach at all levels of the design process. Analysis of successes and failures of organizational efforts in space endeavors is used as a methodological approach to identify key questions to be researched as they often cause many planning and design processing problems.
Development of Computerized Monitoring of Education Plans.
ERIC Educational Resources Information Center
Greene, J. Weldon; And Others
The District of Columbia Public Schools initiated a multiyear planning process in 1983. Among other activities, the process calls for the computerized monitoring of the critical tasks of each of the district's major offices. These tasks, defined by the offices, are designed to facilitate the achievement of specific objectives designated in the…
Responsibility and Responsiveness. The HEW Potential for the Seventies.
ERIC Educational Resources Information Center
Richardson, Elliot L.
The Secretary of HEW presents an overview of departmental undertakings for the purpose of developing more responsible and responsive personnel. The major portion of the statement focuses on internal processes of responsibility and external processes of responsiveness. Departmental strategies, a planning cycle, an operational planning system,…
Intervention mapping: a process for developing theory- and evidence-based health education programs.
Bartholomew, L K; Parcel, G S; Kok, G
1998-10-01
The practice of health education involves three major program-planning activities: needs assessment, program development, and evaluation. Over the past 20 years, significant enhancements have been made to the conceptual base and practice of health education. Models that outline explicit procedures and detailed conceptualization of community assessment and evaluation have been developed. Other advancements include the application of theory to health education and promotion program development and implementation. However, there remains a need for more explicit specification of the processes by which one uses theory and empirical findings to develop interventions. This article presents the origins, purpose, and description of Intervention Mapping, a framework for health education intervention development. Intervention Mapping is composed of five steps: (1) creating a matrix of proximal program objectives, (2) selecting theory-based intervention methods and practical strategies, (3) designing and organizing a program, (4) specifying adoption and implementation plans, and (5) generating program evaluation plans.
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Paris (France).
A summary of educational planning methodologies tested in Argentina, Guatemala, Brazil, Ecuador, and Bolivia, the document offers opinions and proposals about integrated rural development. Integrated rural development is seen as a social, economic, political, and cultural process in rural areas, designed to improve living conditions. Chapters…
Digital Video: Watch Me Do What I Say!
ERIC Educational Resources Information Center
Capraro, Robert M.; Capraro, Mary Margaret; Lamb, Charles E.
This paper establishes a use for digital video in developing preservice teacher metacognition about the teaching process using a lesson plan-rating sheet as a guide. A lesson plan was developed to meet the specific needs of the methods instructors in a professional development program at a large public institution. The categories listed on the…
The Emerging and Employed Worker: Planning for the Strategic Imperative.
ERIC Educational Resources Information Center
Geroy, Gary D.
This paper describes a series of four models around which plans can be developed to determine human development needs. It presents needs assessment models describing the process and participant interaction by which information is gathered to be used in education, training, funding, and/or other human resource development interventions to increase…
ERIC Educational Resources Information Center
Geyer, Patricia
1997-01-01
Examines the process used to develop a lesson plan from an academic research article. Includes a lesson plan developed from an article in the Spring 1997 issue of "The Journal of World History" tracing the history of jute (a substitute for flax) manufacturing in colonial India. (MJP)
Integrating the environment in local strategic planning : Guidelines (Case of Morocco)
NASA Astrophysics Data System (ADS)
Benbrahim, Hafsa
2018-05-01
Since 2010, an advanced regionalization project has been initiated by Morocco, which plans to consolidate the processes of decentralization and deconcentration by extending the powers of the regions and other local authorities. This project, institutionalized in the 2011 Constitution, defines the territorial organization of the Kingdom and reinforces decentralization according to a model of advanced regionalization. Through advanced regionalization, Morocco aims at integrated and sustainable development in economic, social, cultural and environmental terms, through the development of the potential and resources of each region. However, in order to honor this commitment of advanced regionalization, local authorities must be assisted in adopting a local strategic planning approach, allowing them to develop territorial plans for sustainable development in accordance with the national legal framework, specifically the Framework law 99-12, and international commitments in terms of environmental protection. This research deals with the issue of environmental governance in relation to the role and duties of local authorities. Thus, the main goal of our study is to present the guidelines to be followed by the local authorities to improve the quality of the environment integration process in the local strategic planning with the aim of putting it in a perspective of sustainable development.
1991-09-01
putting all tasks directed towsrds achieving an outcome in aequence. The tasks can be viewed as steps in the process (39:2.3). Using this...improvement opportunity is investigated. A plan is developed, root causes are identified, and solutions are tested and implemented. The process is... solutions , check for actual improvement, and integrate the successful improvements into the process. ?UP 7. Check Improvement Performance. Finally, the
A DIY Campus Preservation Plan: Lessons Learned at the University of Mary Washington
ERIC Educational Resources Information Center
Smith, Andrea Livi; Spencer, Michael
2012-01-01
The University of Mary Washington (UMW) in Fredericksburg, Virginia, was founded in 1908. This article describes the process that led to the UMW preservation plan. Unlike most preservation plans, the UMW plan was developed in-house with limited funds. Furthermore, the catalyst for the plan was a grassroots effort on the part of students and alumni…
Directions. The Master Plan for McLennan Community College.
ERIC Educational Resources Information Center
Lowe, Carol, Ed.
This master plan for McLennan Community College (MCC) begins with a mission statement, brief history of the college, and a summary of the planning process. The remainder of the plan lists the 67 strategic goals of the college, the strategies that will be used to attain them, and the planning context within which the goals were developed. In many…
24 CFR 903.17 - What is the process for obtaining public comment on the plans?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., as applicable) and invite public comment on the plan(s). The hearing must be conducted at a location..., and that a public hearing will take place on the plan, and the date, time and location of the hearing... public comment on the plans? 903.17 Section 903.17 Housing and Urban Development Regulations Relating to...
Marine spatial planning in Cyprus
NASA Astrophysics Data System (ADS)
Hadjimitsis, Diofantos; Agapiou, Athos; Mettas, Christodoulos; Themistocleous, Kyriacos; Evagorou, Evagoras; Cuca, Branka; Papoutsa, Christiana; Nisantzi, Argyro; Mamouri, Rodanthi-Elisavet; Soulis, George; Xagoraris, Zafiris; Lysandrou, Vasiliki; Aliouris, Kyriacos; Ioannou, Nicolas; Pavlogeorgatos, Gerasimos
2015-06-01
Marine Spatial Planning (MSP), which is in concept similar to land-use planning, is a public process by which the relevant Member State's authorities analyse and organise human activities in marine areas to achieve ecological, economic and social objectives. MSP aims to promote sustainable growth of maritime economies, sustainable development of marine areas and sustainable use of marine resources. This paper highlights the importance of MSP and provides basic outcomes of the main European marine development. The already successful MSP plans can provide useful feedback and guidelines for other countries that are in the process of implementation of an integrated MSP, such as Cyprus. This paper presents part of the MSP project, of which 80% funded by the European Regional Development Fund (ERDF) and 20% from national contribution. An overview of the project is presented, including data acquisition, methodology and preliminary results for the implementation of MSP in Cyprus.
MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laub, S; Dunn, M; Galbreath, G
2015-06-15
Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or greenmore » according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Y; Tan, J; Jiang, S
Purpose: High dose rate (HDR) brachytherapy treatment planning is conventionally performed in a manual fashion. Yet it is highly desirable to perform computerized automated planning to improve treatment planning efficiency, eliminate human errors, and reduce plan quality variation. The goal of this research is to develop an automatic treatment planning tool for HDR brachytherapy with a cylinder applicator for vaginal cancer. Methods: After inserting the cylinder applicator into the patient, a CT scan was acquired and was loaded to an in-house developed treatment planning software. The cylinder applicator was automatically segmented using image-processing techniques. CTV was generated based on user-specifiedmore » treatment depth and length. Locations of relevant points (apex point, prescription point, and vaginal surface point), central applicator channel coordinates, and dwell positions were determined according to their geometric relations with the applicator. Dwell time was computed through an inverse optimization process. The planning information was written into DICOM-RT plan and structure files to transfer the automatically generated plan to a commercial treatment planning system for plan verification and delivery. Results: We have tested the system retrospectively in nine patients treated with vaginal cylinder applicator. These cases were selected with different treatment prescriptions, lengths, depths, and cylinder diameters to represent a large patient population. Our system was able to generate treatment plans for these cases with clinically acceptable quality. Computation time varied from 3–6 min. Conclusion: We have developed a system to perform automated treatment planning for HDR brachytherapy with a cylinder applicator. Such a novel system has greatly improved treatment planning efficiency and reduced plan quality variation. It also served as a testbed to demonstrate the feasibility of automatic HDR treatment planning for more complicated cases.« less
Introduction to Health Planning.
ERIC Educational Resources Information Center
Bergwall, David F.; And Others
This fundamental text is designed for students of both health care administration and comprehensive health planning. It is intended as a resource on the theory and process of health project planning with some mention of possible sources for further exploration. The emphasis is on how to develop a plan when the planner also has the authority to…
A three-volume report was developed relative to the modelling of investment strategies for regional water supply planning. Volume 1 is the study of capacity expansion over time. Models to aid decision making for the deterministic case are presented, and a planning process under u...
Andrews, M L; Sánchez, V; Carrillo, C; Allen-Ananins, B; Cruz, Y B
2014-02-01
We present the collaborative development of a web-based data collection and monitoring plan for thirty-two county councils within New Mexico's health council system. The monitoring plan, a key component in our multiyear participatory statewide evaluation process, was co-developed with the end users: representatives of the health councils. Guided by the Institute of Medicine's Community, Health Improvement Process framework, we first developed a logic model that delineated processes and intermediate systems-level outcomes in council development, planning, and community action. Through the online system, health councils reported data on intermediate outcomes, including policy changes and funds leveraged. The system captured data that were common across the health council system, yet was also flexible so that councils could report their unique accomplishments at the county level. A main benefit of the online system was that it provided the ability to assess intermediate, outcomes across the health council system. Developing the system was not without challenges, including creating processes to ensure participation across a large rural state; creating shared understanding of intermediate outcomes and indicators; and overcoming technological issues. Even through the challenges, however, the benefits of committing to using participatory processes far outweighed the challenges. Copyright © 2013 Elsevier Ltd. All rights reserved.
Planning Tool for Strategic Evaluation of Facility Plans - 13570
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, Virginia; Cercy, Michael; Hall, Irin
2013-07-01
Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility wasmore » needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)« less
Evidence development and publication planning: strategic process.
Wittek, Michael R; Jo Williams, Mary; Carlson, Angeline M
2009-11-01
A number of decisions in the health care field rely heavily on published clinical evidence. A systematic approach to evidence development and publication planning is required to develop a portfolio of evidence that includes at minimum information on efficacy, safety, durability of effect, quality of life, and economic outcomes. The approach requires a critical assessment of available literature, identification of gaps in the literature, and a strategic plan to fill the gaps to ensure the availability of evidence demanded for clinical decisions, coverage/payment decisions and health technology assessments. The purpose of this manuscript is to offer a six-step strategic process leading to a portfolio of evidence that meets the informational needs of providers, payers, and governmental agencies concerning patient access to a therapy.
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
Case study: reconciling the quality and safety gap through strategic planning.
Jeffs, Lianne; Merkley, Jane; Jeffrey, Jana; Ferris, Ella; Dusek, Janice; Hunter, Catherine
2006-05-01
An essential outcome of professional practice environments is the provision of high-quality, safe nursing care. To mitigate the quality and safety chasm, nursing leadership at St. Michael's Hospital undertook a strategic plan to enhance the nursing professional practice environment. This case study outlines the development of the strategic planning process: the driving forces (platform); key stakeholders (process and players); vision, guiding principles, strategic directions, framework for action and accountability (plan); lessons learned (pearls); and next steps to moving forward the vision, strategic directions and accountability mechanisms (passion and perseverance).
2013-07-18
Department of the Navy ERP Enterprise Resource Planning FMO Office of Financial Operations NAVAIR Naval Air Systems Command NAVSEA Naval...supported by business processes in the Navy Enterprise Resource Planning ( ERP ) system for the Aircraft, Shipbuilding, and Weapons Procurement...appropriations. What We Found Department of the Navy Office of Financial Operations officials did not use the Navy ERP system to support $416 billion in
Limpo, Teresa; Alves, Rui A; Fidalgo, Raquel
2014-06-01
It is well established that the activity of producing a text is a complex one involving three main cognitive processes: Planning, translating, and revising. Although these processes are crucial in skilled writing, beginning and developing writers seem to struggle with them, mainly with planning and revising. To trace the development of the high-level writing processes of planning and revising, from Grades 4 to 9, and to examine whether these skills predict writing quality in younger and older students (Grades 4-6 vs. 7-9), after controlling for gender, school achievement, age, handwriting fluency, spelling, and text structure. Participants were 381 students from Grades 4 to 9 (age 9-15). Students were asked to plan and write a story and to revise another story by detecting and correcting mechanical and substantive errors. From Grades 4 to 9, we found a growing trend in students' ability to plan and revise despite the observed decreases and stationary periods from Grades 4 to 5 and 6 to 7. Moreover, whereas younger students' planning and revising skills made no contribution to the quality of their writing, in older students, these high-level skills contributed to writing quality above and beyond control predictors. The findings of this study seem to indicate that besides the increase in planning and revising, these skills are not fully operational in school-age children. Indeed, given the contribution of these high-level skills to older students' writing, supplementary instruction and practice should be provided from early on. © 2013 The British Psychological Society.
24 CFR 598.305 - Designation factors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND... Designation Process § 598.305 Designation factors. In choosing among nominated urban areas eligible for designation, the Secretary will consider: (a) Quality of strategic plan. The quality of the strategic plan...
The University and the Community: Planning for an Alternative Form of Educational Service Delivery.
ERIC Educational Resources Information Center
Strickland, Wayne G.
1980-01-01
The planning process and marketing strategy adopted by a large urban postsecondary institution investigating the feasibility of developing a branch campus is described. Among the planning elements were a market analysis and citizen interest survey. (MSE)
Planned Change in Education: Current Trends of Inquiry.
ERIC Educational Resources Information Center
Van Meter, Eddy J.; Scollay, Susan J.
1985-01-01
Four trends within planned change literature are identified: the increased use of the concept of limited rationality; a better understanding of the implementation process; more exploration of issues dealing with evaluation; and the development of new models for understanding planned change. (MD)
Horton, M C; Lewis, T E; Kinsey, T V
1999-05-01
Prior to June 1997, military picture archiving and communications systems (PACS) were planned, procured, and installed with key decisions on the system, equipment, and even funding sources made through a research and development office called Medical Diagnostic Imaging Systems (MDIS). Beginning in June 1997, the Joint Imaging Technology Project Office (JITPO) initiated a collaborative and consultative process for planning and implementing PACS into military treatment facilities through a new Department of Defense (DoD) contract vehicle called digital imaging networks (DIN)-PACS. The JITPO reengineered this process incorporating multiple organizations and politics. The reengineered PACS process administered through the JITPO transformed the decision process and accountability from a single office to a consultative method that increased end-user knowledge, responsibility, and ownership in PACS. The JITPO continues to provide information and services that assist multiple groups and users in rendering PACS planning and implementation decisions. Local site project managers are involved from the outset and this end-user collaboration has made the sometimes difficult transition to PACS an easier and more acceptable process for all involved. Corporately, this process saved DoD sites millions by having PACS plans developed within the government and proposed to vendors second, and then having vendors respond specifically to those plans. The integrity and efficiency of the process have reduced the opportunity for implementing nonstandard systems while sharing resources and reducing wasted government dollars. This presentation will describe the chronology of changes, encountered obstacles, and lessons learned within the reengineering of the PACS process for DIN-PACS.
An integrative health information systems approach for facilitating strategic planning in hospitals.
Killingsworth, Brenda; Newkirk, Henry E; Seeman, Elaine
2006-01-01
This article presents a framework for developing strategic information systems (SISs) for hospitals. It proposes a SIS formulation process which incorporates complexity theory, strategic/organizational analysis theory, and conventional MIS development concepts. Within the formulation process, four dimensions of SIS are proposed as well as an implementation plan. A major contribution of this article is the development of a hospital SIS framework which permits an organization to fluidly respond to external, interorganizational, and intraorganizational influences. In addition, this article offers a checklist which managers can utilize in developing an SIS in health care.
Strategic planning--a plan for excellence for South Haven Health System.
Urbanski, Joanne; Baskel, Maureen; Martelli, Mary
2011-01-01
South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-06
... analyses and the development of other elements of the standard; developing a written action plan for..., revalidating and retaining the process hazard analysis; developing and implementing written operating [[Page 66639
Audio Development Laboratory (ADL) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Romero, Andy
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ADL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Reengineering the Project Design Process
NASA Technical Reports Server (NTRS)
Casani, E.; Metzger, R.
1994-01-01
In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Isaksson, Karolina, E-mail: karolina.isaksson@vti.se; Storbjoerk, Sofie, E-mail: sofie.storbjork@liu.se
This paper seeks to provide deeper insights into how EA ineffectiveness is produced in land use planning practice. This is explored in a study of local development planning in the city of Vaesteras, Sweden. The case in question is the development of a large out-of-town shopping centre, propelled by the establishment of a new IKEA furniture store. The Healey (2007) framework of planning as strategy making is applied as an analytical framework, together with a focus on power-knowledge relations. In the analysis, we identify a range of mechanisms that produced ineffectiveness by limiting the role of environmental knowledge throughout themore » planning process. The specific mechanisms we identified were related to the overall consensus perspective in local development strategies and plans, a lack of concretisation and integration of various policies and strategies, a range of exclusion mechanisms and an overall focus on mitigation and benefits of the process in question. In practice, these mechanisms were closely intertwined. Our main conclusion is, consequently, that increased effectiveness of EA would require fundamental transformation of the norms, frameworks and routines that implicitly and explicitly guide land use planning in practice. - Highlights: Black-Right-Pointing-Pointer We analyse how EA-ineffectiveness is produced in land use planning practice. Black-Right-Pointing-Pointer Several mechanisms produce EA-ineffectiveness throughout the whole planning process. Black-Right-Pointing-Pointer These mechanisms are often closely intertwined and mutually reinforcing each other. Black-Right-Pointing-Pointer Enhancing EA-effectiveness requires a fundamental shift of the norms, frameworks and routines shaping planning practice.« less
Wilson, Lauren; Deokar, Angela J; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-Jo
The Center of Disease Control and Prevention's Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans for numerous outcomes.
Wilson, Lauren; Deokar, Angela J.; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-jo
2018-01-01
Context The Center of Disease Control and Prevention’s Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. Objective (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Design Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. Results For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. Conclusion The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans for numerous outcomes. PMID:29189505
NASA Astrophysics Data System (ADS)
Suleiman, Lina
2017-04-01
Planners and policymakers' concern escalates over conventional systems dealing with rains in cities based on domination and control of nature rather than harmony and design with nature. A new spatial planning paradigm is needed to put in place systems which mimic natural water systems and promise multiple values instead of systems consider rain as a source of problem. However, such approach embodies significant planning challenges. Urban rain harvesting systems (URHs) are inherently viewed as 'sociotechnical' systems. As such, planning processes should consider the interdependence of 'social' and 'technical' aspects as essential elements if a transition towards sustainable urban water systems is to be realised. Drawing on a common understanding for what urban rain harvesting systems should deliver in terms of 'functions' and 'added values', a generic planning framework is developed to inform practitioners on how the 'socio' and 'technical' elements should be assimilated in a long-term and integrated planning processes of URHs. Using the developed framework, the paper examines the planning and maintenance processes of urban rain harvesting systems in Årstafältet and Hammarby Sjöstad respectively. Results show that planners lack a common operational understanding on how these systems should be designed holistically in a long term and integrated planning processes creating working gabs or positional conflicts. In practice, urban planners and water engineers look at these systems as either urban design component or water drainage system to deal with technical functions hindering a smooth transition path towards urban rain harvesting systems. The paper concludes on the urgency for reordering roles and relations within a new set-up organisation to incubate these systems in long-term planning and maintenance processes. Key words: 'Sociotechnical' system, Water, Planning, Urban Rain Harvesting systems (URHs), Hammarby Sjostad and Årstafältet
Guillermo A. Mendoza; Roger J. Meimban; Philip A. Araman; William G. Luppold
1991-01-01
A log inventory model and a real-time hardwood process simulation model were developed and combined into an integrated production planning and control system for hardwood sawmills. The log inventory model was designed to monitor and periodically update the status of the logs in the log yard. The process simulation model was designed to estimate various sawmill...
Framework and components for effective discharge planning system: a delphi methodology
2012-01-01
Background To reduce avoidable hospital readmissions, effective discharge planning and appropriate post discharge support care are key requirements. This study is a 3-staged process to develop, pretest and pilot a framework for an effective discharge planning system in Hong Kong. This paper reports on the methodology of Delphi approach and findings of the second stage on pre-testing the framework developed so as to validate and attest to its applicability and practicability in which consensus was sought on the key components of discharge planning. Methods Delphi methodology was adopted to engage a group of experienced healthcare professionals to rate and discuss the framework and components of an effective discharge planning. The framework was consisted 36 statements under 5 major themes: initial screening, discharge planning process, coordination of discharge, implementation of discharge, and post discharge follow-up. Each statement was rated independently based on 3 aspects including clarity, validity and applicability on a 5-point Likert-scale. Statement with 75% or above of participants scoring 4–5 on all 3 aspects would be included in the discharge planning framework. For those statements not reaching 75% of consensus in any one of the aspect, it would be revised or discarded following the group discussion, and be re-rated in another round. Results A total of 24 participants participated in the consensus-building process. In round one rating, consensus was achieved in 25 out of 36 statements. Among those 11 statements not reaching consensus, the major concern was related to the “applicability” of the statements. The participants expressed a lack of manpower, skills and time in particular during weekends and long holidays in carrying out assessment and care plans within 24 h after admission. There were also timeliness and availability issue in providing transportation and necessary equipment to the patients. To make the statements more applicable, the wordings of some of the statements were revised to provide greater flexibility. Due to the lack of a statement in clarifying the role of the members of the healthcare professional team, one additional statement on the role and responsibility of the multidisciplinary team members was added. The first theme on “initial screening” was further revised to “initial screening and assessment” to better reflect the first stage of discharge planning process. After two rounds of rating process, all the 36 statements and the newly added statement reached consensus Conclusions A structured, systematic and coordinated system of hospital discharge system is required to facilitate the discharge process to ensure a smooth patient transition from the hospital to the community and improve patient health outcome in both clinical and social aspect. The findings of this paper provide a reference framework helping policymakers and hospital managers to facilitate the development of a coherent and systematized discharge planning process. Adopting a Delphi approach also demonstrates the values of the method as a pre-test (before the clinical run) of the components and requirements of a discharge planning system taking into account of the local context and system constraints, which would lead to improvements to its applicability and practicability. To confirm the applicability and practicability of this consensus framework for discharge planning system, the third stage of process of development of the discharge planning framework is to apply and pilot the framework in a hospital setting to evaluate its feasibility, applicability and impact in hospital including satisfaction from both the perspectives of staff and patients. PMID:23151173
A template for integrated community sustainability planning.
Ling, Christopher; Hanna, Kevin; Dale, Ann
2009-08-01
This article describes a template for implementing an integrated community sustainability plan. The template emphasizes community engagement and outlines the components of a basic framework for integrating ecological, social and economic dynamics into a community plan. The framework is a series of steps that support a sustainable community development process. While it reflects the Canadian experience, the tools and techniques have applied value for a range of environmental planning contexts around the world. The research is case study based and draws from a diverse range of communities representing many types of infrastructure, demographics and ecological and geographical contexts. A critical path for moving local governments to sustainable community development is the creation and implementation of integrated planning approaches. To be effective and to be implemented, a requisite shift to sustainability requires active community engagement processes, political will, and a commitment to political and administrative accountability, and measurement.
The Mission Operations Planning Assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
The mission operations planning assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
NASA Astrophysics Data System (ADS)
Harris, E.
Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.
Fernández, Maria E; Gonzales, Alicia; Tortolero-Luna, Guillermo; Partida, Sylvia; Bartholomew, L Kay
2005-10-01
This article describes the development of the Cultivando La Salud program, an intervention to increase breast and cervical cancer screening for Hispanic farmworker women. Processes and findings of intervention mapping (IM), a planning process for development of theory and evidence-informed program are discussed. The six IM steps are presented: needs assessment, preparation of planning matrices, election of theoretic methods and practical strategies, program design, implementation planning, and evaluation. The article also describes how qualitative and quantitative findings informed intervention development. IM helped ensure that theory and evidence guided (a) the identification of behavioral and environmental factors related to a target health problem and (b) the selection of the most appropriate methods and strategies to address the identified determinants. IM also guided the development of program materials and implementation by lay health workers. Also reported are findings of the pilot study and effectiveness trial.
33 CFR 385.12 - Pilot projects.
Code of Federal Regulations, 2013 CFR
2013-07-01
... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...
Responding to Community Needs.
ERIC Educational Resources Information Center
Salinas, Alicia M.
This paper outlines the development process of a Comprehensive Education Plan (CEP) for one Texas school district. The Center for the Management of Innovation in Multicultural Education (MIME) is assisting the Edcouch-Elsa Independent School District to develop a comprehensive plan that will answer the whole community's educational needs. The…
76 FR 18555 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-04
... leadership over the strategic planning process and the development of CMS strategic goals, metrics, and plans. Direct the development of financial and health care trend analysis and management insight report to inform senior CMS leadership strategic decision making. Set priorities for CSP direction, budget...
Cost Benefit Analysis of Enterprise Resource Planning System for the Naval Postgraduate School
2002-06-01
Department-wide introduction and use of appropriate commercial financial practices and reporting • Develop a strategic plan for implementing a business... Development of a process innovation approach given the current capabilities of the system, recommend possible alternatives to close gaps. E
DOT National Transportation Integrated Search
1998-05-01
Recent technological advances in computer hardware, software, and image processing have led to the development of automated license plate reading equipment. This equipment has primarily been developed for enforcement and security applications, such a...
24 CFR 581.9 - Application process.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Application process. 581.9 Section 581.9 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN...
24 CFR 581.9 - Application process.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Application process. 581.9 Section 581.9 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN...
24 CFR 581.9 - Application process.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Application process. 581.9 Section 581.9 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN...
24 CFR 581.9 - Application process.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Application process. 581.9 Section 581.9 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN...
24 CFR 581.9 - Application process.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Application process. 581.9 Section 581.9 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN...
34 CFR 200.41 - School improvement plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... for participating in that professional development; and (iii) Incorporates teacher mentoring...) Within 45 days of receiving a school improvement plan, the LEA must— (i) Establish a peer-review process...
24 CFR 91.15 - Submission date.
Code of Federal Regulations, 2010 CFR
2010-04-01
... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS General § 91.15 Submission date. (a... process, the action plan, and the certifications must be submitted on an annual basis. (2) The housing, and homeless needs assessment, market analysis, and strategic plan must be submitted at least once...
DOT National Transportation Integrated Search
2008-12-15
Intelligent Transportation Systems (ITS) planning requires the use of tools to assess the performance of ITS deployment alternatives relative to each other and to other types of transportation system improvement alternatives. This research project in...
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
DOT National Transportation Integrated Search
1997-08-28
Federal, state, and local welfare reform initiatives may require the planning : and development of new and innovative public transportation services to ensure : that ex-welfare recipients have the needed mobility to reach employment : opportunities, ...
18 CFR 708.3 - Policy, objectives, and standards.
Code of Federal Regulations, 2012 CFR
2012-04-01
... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...
18 CFR 708.3 - Policy, objectives, and standards.
Code of Federal Regulations, 2013 CFR
2013-04-01
... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...
18 CFR 708.3 - Policy, objectives, and standards.
Code of Federal Regulations, 2014 CFR
2014-04-01
... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...
13 CFR 307.9 - Revolving Loan Fund Plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... lending area under § 307.18, a change in critical management staff, or a change to the strategic purpose...-approved economic development plan, if applicable, for the Region. (2) The Plan must identify the strategic... management procedures, including loan processing, underwriting, closing, disbursements, collections...
Modified allocation capacitated planning model in blood supply chain management
NASA Astrophysics Data System (ADS)
Mansur, A.; Vanany, I.; Arvitrida, N. I.
2018-04-01
Blood supply chain management (BSCM) is a complex process management that involves many cooperating stakeholders. BSCM involves four echelon processes, which are blood collection or procurement, production, inventory, and distribution. This research develops an optimization model of blood distribution planning. The efficiency of decentralization and centralization policies in a blood distribution chain are compared, by optimizing the amount of blood delivered from a blood center to a blood bank. This model is developed based on allocation problem of capacitated planning model. At the first stage, the capacity and the cost of transportation are considered to create an initial capacitated planning model. Then, the inventory holding and shortage costs are added to the model. These additional parameters of inventory costs lead the model to be more realistic and accurate.
Development of a plan for automating integrated circuit processing
NASA Technical Reports Server (NTRS)
1971-01-01
The operations analysis and equipment evaluations pertinent to the design of an automated production facility capable of manufacturing beam-lead CMOS integrated circuits are reported. The overall plan shows approximate cost of major equipment, production rate and performance capability, flexibility, and special maintenance requirements. Direct computer control is compared with supervisory-mode operations. The plan is limited to wafer processing operations from the starting wafer to the finished beam-lead die after separation etching. The work already accomplished in implementing various automation schemes, and the type of equipment which can be found for instant automation are described. The plan is general, so that small shops or large production units can perhaps benefit. Examples of major types of automated processing machines are shown to illustrate the general concepts of automated wafer processing.
Aligning Strategic and Information Systems Planning: A Review of Navy Efforts
1990-03-01
plans." [Ref. 11:p. 6] The results of the component level IR planning process are documented in Component Information Management Plans ( CIMP ). In mid...August, the CIMP’s are presented to the IR Planning Committee at the annual IR Planning Conference. Each CIMP is then distributed to all organizations...objectives promulgated in the CIMP or FASP will, if approved for development or acquisition, be further refined in project plans, which in turn, form the
A computer-based tutorial structure for teaching and applying a complex process
Daniel L. Schmoldt; William G Bradshaw
1991-01-01
Economic accountability concerns for wildfire prevention planning have led to the development of an ignition management approach to fire problems. The Fire Loss Prevention Planning Process (FLPPP) systematizes fire problem analyses and concomitantly establishes a means for evaluating prescribed prevention programs. However, new users of the FLPPP have experienced...
ERIC Educational Resources Information Center
Kranitz, Gina; Hart, Kenneth R.
As an institution having undergone many changes over the past 13 years in the Maricopa Community College District, Paradise Valley Community College (PVCC) in Arizona has developed and implemented its strategic planning process, institutional effectiveness and student outcomes assessment model, and resource allocation (budget) process over the…
Integrated Design System (IDS) Tools for the Spacecraft Aeroassist/Entry Vehicle Design Process
NASA Technical Reports Server (NTRS)
Olynick, David; Braun, Robert; Langhoff, Steven R. (Technical Monitor)
1997-01-01
The definition of the Integrated Design System technology focus area as presented in the NASA Information Technology center of excellence strategic plan is described. The need for IDS tools in the aeroassist/entry vehicle design process is illustrated. Initial and future plans for spacecraft IDS tool development are discussed.
Messy Design: Organic Planning for Blended Learning
ERIC Educational Resources Information Center
Rankin, Andrea; Luzeckyj, Ann; Haggis, Jane; Gare, Callum
2016-01-01
In this paper we argue that a messy design process does not mitigate against sharing and transfer of artefacts across educational domains. In fact, such a process can aid in developing a model for learning and teaching that is reusable and authentic. We describe the planning and design of an integrated and interactive blended learning environment…
Health sector operational planning and budgeting processes in Kenya—“never the twain shall meet”
Molyneux, Sassy; Goodman, Catherine
2015-01-01
Summary Operational planning is considered an important tool for translating government policies and strategic objectives into day‐to‐day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top‐down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local‐level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. PMID:25783862
Vocational Education and Training Teacher Professional Development: Tensions and Context
ERIC Educational Resources Information Center
Bound, Helen
2011-01-01
Planning and implementing teacher professional development is a process of engaging in organisational learning and change. Yet our planning and implementation of professional development is at times a series of one-off sessions and can be quite ad hoc. This paper argues that teacher learning takes place not only through formal sessions but also…
Developing Health and Family Planning Print Materials for Low-Literate Audiences: A Guide.
ERIC Educational Resources Information Center
Zimmerman, Margot; And Others
This manual offers guidelines for developing health and family planning support materials for illiterate and low-literate groups. The techniques used rely heavily on involvement of the target audience. Following the introduction, each of the nine sections of the guide discusses a separate step in the materials development process: (1) "target…
ERIC Educational Resources Information Center
Sammis, Theodore W.; Shukla, Manoj K.; Mexal, John G.; Wang, Junming; Miller, David R.
2013-01-01
Universities develop strategic planning documents, and as part of that planning process, logic models are developed for specific programs within the university. This article examines the long-standing pecan program at New Mexico State University and the deficiencies and successes in the evolution of its logic model. The university's agricultural…
Smith, Chris; Vannak, Uk; Sokhey, Ly; Ngo, Thoai D; Gold, Judy; Free, Caroline
2016-01-05
The objective of this paper is to outline the formative research process used to develop the MOTIF mobile phone-based (mHealth) intervention to support post-abortion family planning in Cambodia. The formative research process involved literature reviews, interviews and focus group discussions with clients, and consultation with clinicians and organisations implementing mHealth activities in Cambodia. This process led to the development of a conceptual framework and the intervention. Key findings from the formative research included identification of the main reasons for non-use of contraception and patterns of mobile phone use in Cambodia. We drew on components of existing interventions and behaviour change theory to develop a conceptual framework. A multi-faceted voice-based intervention was designed to address health concerns and other key determinants of contraception use. Formative research was essential in order to develop an appropriate mHealth intervention to support post-abortion contraception in Cambodia. Each component of the formative research contributed to the final intervention design.
NASA Astrophysics Data System (ADS)
Zhou, Yuhong; Klages, Peter; Tan, Jun; Chi, Yujie; Stojadinovic, Strahinja; Yang, Ming; Hrycushko, Brian; Medin, Paul; Pompos, Arnold; Jiang, Steve; Albuquerque, Kevin; Jia, Xun
2017-06-01
High dose rate (HDR) brachytherapy treatment planning is conventionally performed manually and/or with aids of preplanned templates. In general, the standard of care would be elevated by conducting an automated process to improve treatment planning efficiency, eliminate human error, and reduce plan quality variations. Thus, our group is developing AutoBrachy, an automated HDR brachytherapy planning suite of modules used to augment a clinical treatment planning system. This paper describes our proof-of-concept module for vaginal cylinder HDR planning that has been fully developed. After a patient CT scan is acquired, the cylinder applicator is automatically segmented using image-processing techniques. The target CTV is generated based on physician-specified treatment depth and length. Locations of the dose calculation point, apex point and vaginal surface point, as well as the central applicator channel coordinates, and the corresponding dwell positions are determined according to their geometric relationship with the applicator and written to a structure file. Dwell times are computed through iterative quadratic optimization techniques. The planning information is then transferred to the treatment planning system through a DICOM-RT interface. The entire process was tested for nine patients. The AutoBrachy cylindrical applicator module was able to generate treatment plans for these cases with clinical grade quality. Computation times varied between 1 and 3 min on an Intel Xeon CPU E3-1226 v3 processor. All geometric components in the automated treatment plans were generated accurately. The applicator channel tip positions agreed with the manually identified positions with submillimeter deviations and the channel orientations between the plans agreed within less than 1 degree. The automatically generated plans obtained clinically acceptable quality.
Currie, Kay; Grundy, Maggie
2011-10-01
To highlight implications for managers from the implementation of a national advanced practice succession planning development pathway within Scotland. Internationally, advanced practice posts have often developed in an ad-hoc manner, with little organizational attention to succession planning. Evaluation of a pilot national succession planning development pathway identified mechanisms which facilitate or hamper effective planning for advanced practice roles. A responsive evaluation design incorporating semi-structured questionnaires to pathway participants (n = 15) and semi-structured telephone interviews with case-site pathway participants (n = 7) and their line managers. Managers believed the development pathway was worthwhile; however, there was limited strategic planning to match individuals' development to service need. Practitioners generally perceived managers as interested in their development, although levels of practical support varied. There is concern from both managers and practitioners regarding ongoing funding for advanced practice development. The present evaluation study reiterates the need for organizational commitment to succession planning including robust service needs analysis mechanisms and adequate funding for development processes. Nurse managers are viewed as the 'gatekeepers' to opportunities for developing advanced nurse practitioners; scare resources must be targeted effectively to support succession planning through the development of selected individuals for future advanced practice posts, justified by service need. © 2011 Blackwell Publishing Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Faydide, B.
1997-07-01
This paper presents the current and planned numerical development for improving computing performance in case of Cathare applications needing real time, like simulator applications. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the general characteristics of the code are presented, dealing with physical models, numerical topics, and validation strategy. Then, the current and planned applications of Cathare in the field of simulators are discussed. Some of these applications were made in the past, using a simplified and fast-running version of Cathare (Cathare-Simu); the status of the numerical improvements obtained withmore » Cathare-Simu is presented. The planned developments concern mainly the Simulator Cathare Release (SCAR) project which deals with the use of the most recent version of Cathare inside simulators. In this frame, the numerical developments are related with the speed up of the calculation process, using parallel processing and improvement of code reliability on a large set of NPP transients.« less
Armored Family of Vehicles (AFV). Phase 1 Report. Book 7. Volume 11
1987-08-31
Armored Family of Vehicles. Specific requirements and products are described which initiate the training development process and a training management ...approach for the TRADOC and proponent schools to plan, develop, manage and integrate the training subsystem(s) for the Armored Family of Vehicles...Procedures. q. Charter, Armored Family of Vehicles. r. Operational and Organizational (O&W) Plan for AFV. s. System MANPRINT Management Plan for AFV
The interplay of governance, power and citizen participation in community tourism planning
E.J. Jordan; C.A. Vogt; Linda Kruger; N. Grewe
2013-01-01
This research examines a unique case of tourism planning and explores the relationships between governance, power, and citizen participation in community decision-making. In less than two years, the community of Sitka, Alaska, undertook two separate tourism-planning processes in response to proposed tourism development. The first plan followed a participant-led...
FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2010
2010-01-01
The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
A Framework to Support S&T Planning for Royal Australian Navy Capability Acquisition
2012-03-01
for guiding policy and assisting with strategic planning innovation processes. At the commencement of a Foresight Planning exercise the...for many Australian Defence Force (ADF) capability projects . Specifically, the methodology could prove beneficial in the development of science and...27 6.4 Selecting Appropriate Foresight Planning Methods ....................................... 28 7. SCIENCE AND
NASA Technical Reports Server (NTRS)
Decker, Deron R.
1991-01-01
Part of the role of the Mission Operations Lab is the development of budget inputs for Huntsville Operations/Payload Crew Training Center/Payload Operations Control Center (HOSC/PCTC/POCC) activity. These budget inputs are part of the formal Program Operating Plan (POP) process, which occurs twice yearly, and of the formal creation of the yearly operating plan. Both POPs and the operation plan serve the purpose of mapping out planned expenditures for the next fiscal year and for a number of outlying years. Based on these plans, the various Project Offices at the Center fund the HOSC/PCTC/POCC activity. Because of Mission Operations Lab's role in budget development, some of the Project Offices have begun looking to Mission Operations, and specifically the EO02 branch, to track expenditures and explain/justify any deviations from plans. EO02 has encountered difficulties acquiring the necessary information to perform this function. It appears that the necessary linkages with other units had not been fully developed and integrated with the flow of information in budget implementation. The purpose of this study is to document the budget process from the point of view of EO02 and to identify the steps necessary for it to effectively perform this role on a continuous basis.
A plan for structured management of the Systems Approach to Training (SAT) process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schurman, D.L.
1987-01-01
This paper describes the plan and accomplishments for development of a Systematic Management Plan for the Systems Approach to Training (SMPSAT). This project is sponsored by the United States Marine Corps Headquarters training policy branch (HQMC(TAP)). Purpose of this effort is to develop a comprehensive plan for management of the Systems Approach to Training (SAT) system in the USMC. This management plan will allow HQMC to monitor the SAT system in order to provide maximum support to the SAT system in both the formal schools and the Fleet Marine Force.
Speak Up Speak Out Coalition Survey Results | Science ...
Comprehensive planning is a visionary planning process that integrates community values and land use policy. The Mayor of Duluth, Minnesota, directed the inclusion of two new values into the City’s comprehensive planning process to direct the community’s future, process: health and fairness. In order to understand the meanings of health and fairness that residents of the city hold, the Community Planning Department included questions in a city-wide survey of planning priorities. As a community organization reviewed the survey results that would inform the new directives, they realized that overburdened communities were underrepresented in the survey responses. To address this deficiency, the community organization asked the City of Duluth if they could conduct a survey of the underrepresented voices to ensure their input was included in the process. The Health in All Policies Coalition contacted the USEPA Office of Research and Development in Duluth, MN at the advice of the Planning Department. The support USEPA provided ensured that the Coalition could make recommendations to the City of Duluth based on systematically collected and analyzed data. This presentation will share the results of the survey. This presentation of the Speak Up Speak Out survey data represents support for local decision-making, technical assistance and data analysis. The data were collected and analyzed through advice and consultation with USEPA Office of Research and Development, an
Panzera, Annette June; Murray, Richard; Stewart, Ruth; Mills, Jane; Beaton, Neil; Larkins, Sarah
2016-01-01
Creating a stable and sustainable health workforce in regional, rural and remote Australia has long been a challenge to health workforce planners, policy makers and researchers alike. Traditional health workforce planning is often reactive and assumes continuation of current patterns of healthcare utilisation. This demonstration project in Far North Queensland exemplifies how participatory regional health workforce planning processes can accurately model current and projected local workforce requirements. The recent establishment of Primary Health Networks (PHNs) with the intent to commission health services tailored to individual healthcare needs underlines the relevance of such an approach. This study used action research methodology informed by World Health Organization (WHO) systems thinking. Four cyclical stages of health workforce planning were followed: needs assessment; health service model redesign; skills-set assessment and workforce redesign; and development of a workforce and training plan. This study demonstrated that needs-based loco-regional health workforce planning can be achieved successfully through participatory processes with stakeholders. Stronger health systems and workforce training solutions were delivered by facilitating linkages and planning processes based on community need involving healthcare professionals across all disciplines and sectors. By focusing upon extending competencies and skills sets, local health professionals form a stable and sustainable local workforce. Concrete examples of initiatives generated from this process include developing a chronic disease inter-professional teaching clinic in a rural town and renal dialysis being delivered locally to an Aboriginal community. The growing trend of policy makers decentralising health funding, planning and accountability and rising health system costs increase the future utility of this approach. This type of planning can also assist the new PHNs to commission health services that meet the needs of the population and contribute to service and system improvement and innovation.
Developing an information systems strategy for nursing.
Callanan, K M; Hughes, S J
1995-01-01
With the rapidly changing health care environment and information technology advances, organizations need to engage in strategic, planned change in order to allocate limited resources, achieve the organization's goals, and fulfill its mission [1]. One of the most important aspects of the organization's planned strategies for change concerns the information systems. The involvement of the nursing department in this process is critical. This poster presentation will communicate how nurses can develop an information systems strategic plan that will enable them to play an active role as contributors and vital participants in the strategic and business planning processes for information systems. This information systems strategy for nursing will: a) provide direction and purpose, b) guide nursing in identifying the kinds of information technology needed, c) assist in timely implementation of a system that supports nursing, and d) identify desired outcomes and benefits of an information system. The nursing information systems plan must be built on, and support, the organization's mission and business plan and integrate into the over-all information systems plans [2]. Components of the nursing strategic plan include the nursing mission statement and vision, an assessment of the current environment to identify supporting technology needed to achieve the nursing vision, expectations/anticipated outcomes, environmental considerations, and special staffing/expertise considerations. The nursing vision and mission statement is an articulation of the overall direction and purpose of the nursing organization. An assessment of the nursing organization, problem areas, opportunities for growth, the physical environment, existing systems, communications requirements, and resources is carried out to help identify areas where new technologies and automated methods of managing information could be applied. Special staffing and expertise not currently available in the organization, but necessary to the successful implementation of the plan, should be identified, and plans for filling those needs should be included in the planning and prioritization process. Based on the mission and assessment findings, goals or anticipated outcomes are developed. These goals must be realistic, financially feasible, and logistically achievable; they should also provide direction for action and decision-making [3]. Measurable objectives and detailed action plans can then be developed from these goals when implementation of this aspect of the strategic plan is begun. It is especially important, even at a strategic planning level, to consider change management techniques, including specific steps to involve individuals who will be affected by the change and to ensure open communication throughout the process. Efforts to collaborate with all affected departments and to offer input and educational opportunities to the various members of the health care team should be included in the strategic plan. A business plan describing the mission, goals, and objectives for a specific system implementation is the final step in the strategic planning process. The business plan includes expected outcomes and cost justification and may be done in cooperation with other departments (in the organization) that will be involved with this system. The business plan is used to communicate the information system's needs to the administration and governing board of the organization. With a good information systems strategy, nursing will be prepared to make more timely and better informed decisions related to applying information technology within the nursing department. The end results of this planning should be evident in the improved utilization of information technology to support the nursing vision and mission.
Can health feasibly be considered as part of the planning process in Scotland?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Higgins, Martin; Douglas, Margaret; Muirie, Jill
2005-10-15
The planning system is significant because of its capacity to determine the quality of the built environment as well as the health, well-being and quality of life of the individuals and communities therein. Development planning is especially important because of the long-term impact of the decisions. This paper was developed in response to increasing recognition amongst HIA practitioners in Scotland of the importance of planning for health. It focuses on the relationship between the planning system in Scotland, specifically the Development Planning element of it, and population health and considers how the health impact assessment (HIA) approach can facilitate andmore » support joint working with planners. In particular, consideration is given to the potential impact of the introduction of Strategic Environmental Assessment (SEA) on the linkages between health, HIA and planning.« less
Raymond, Nancy C; Wyman, Jean F; Dighe, Satlaj; Harwood, Eileen M; Hang, Mikow
2018-06-01
Process evaluation is an important tool in quality improvement efforts. This article illustrates how a systematic and continuous evaluation process can be used to improve the quality of faculty career development programs by using the University of Minnesota's Building Interdisciplinary Research Careers in Women's Health (BIRCWH) K12 program as an exemplar. Data from a rigorous process evaluation incorporating quantitative and qualitative measurements were analyzed and reviewed by the BIRCWH program leadership on a regular basis. Examples are provided of how this evaluation model and processes were used to improve many aspects of the program, thereby improving scholar, mentor, and advisory committee members' satisfaction and scholar outcomes. A rigorous evaluation plan can increase the effectiveness and impact of a research career development plan.
NASA Astrophysics Data System (ADS)
Aksenova, Olesya; Nikolaeva, Evgenia; Cehlár, Michal
2017-11-01
This work aims to investigate the effectiveness of mathematical and three-dimensional computer modeling tools in the planning of processes of fuel and energy complexes at the planning and design phase of a thermal power plant (TPP). A solution for purification of gas emissions at the design development phase of waste treatment systems is proposed employing mathematical and three-dimensional computer modeling - using the E-nets apparatus and the development of a 3D model of the future gas emission purification system. Which allows to visualize the designed result, to select and scientifically prove economically feasible technology, as well as to ensure the high environmental and social effect of the developed waste treatment system. The authors present results of a treatment of planned technological processes and the system for purifying gas emissions in terms of E-nets. using mathematical modeling in the Simulink application. What allowed to create a model of a device from the library of standard blocks and to perform calculations. A three-dimensional model of a system for purifying gas emissions has been constructed. It allows to visualize technological processes and compare them with the theoretical calculations at the design phase of a TPP and. if necessary, make adjustments.
Value-focused framework for defining landscape-scale conservation targets
Romañach, Stephanie; Benscoter, Allison M.; Brandt, Laura A.
2016-01-01
Conservation of natural resources can be challenging in a rapidly changing world and require collaborative efforts for success. Conservation planning is the process of deciding how to protect, conserve, and enhance or minimize loss of natural and cultural resources. Establishing conservation targets (also called indicators or endpoints), the measurable expressions of desired resource conditions, can help with site-specific up to landscape-scale conservation planning. Using conservation targets and tracking them through time can deliver benefits such as insight into ecosystem health and providing early warnings about undesirable trends. We describe an approach using value-focused thinking to develop statewide conservation targets for Florida. Using such an approach allowed us to first identify stakeholder objectives and then define conservation targets to meet those objectives. Stakeholders were able to see how their shared efforts fit into the broader conservation context, and also anticipate the benefits of multi-agency and -organization collaboration. We developed an iterative process for large-scale conservation planning that included defining a shared framework for the process, defining the conservation targets themselves, as well as developing management and monitoring strategies for evaluation of their effectiveness. The process we describe is applicable to other geographies where multiple parties are seeking to implement collaborative, large-scale biological planning.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia-Montero, Luis G., E-mail: luisgonzaga.garcia@upm.e; Lopez, Elena, E-mail: elopez@caminos.upm.e; Monzon, Andres, E-mail: amonzon@caminos.upm.e
Most Strategic Environmental Assessment (SEA) research has been concerned with SEA as a procedure, and there have been relatively few developments and tests of analytical methodologies. The first stage of the SEA is the 'screening', which is the process whereby a decision is taken on whether or not SEA is required for a particular programme or plan. The effectiveness of screening and SEA procedures will depend on how well the assessment fits into the planning from the early stages of the decision-making process. However, it is difficult to prepare the environmental screening for an infrastructure plan involving a whole country.more » To be useful, such methodologies must be fast and simple. We have developed two screening tools which would make it possible to estimate promptly the overall impact an infrastructure plan might have on biodiversity and global warming for a whole country, in order to generate planning alternatives, and to determine whether or not SEA is required for a particular infrastructure plan.« less
2014-01-01
Background Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. Methods We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Results Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Conclusions Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process. PMID:24428945
Rutten, Geert M; Harting, Janneke; Bartholomew, Leona K; Braspenning, Jozé C; van Dolder, Rob; Heijmans, Marcel Fgj; Hendriks, Erik Jm; Kremers, Stef Pj; van Peppen, Roland Ps; Rutten, Steven Tj; Schlief, Angelique; de Vries, Nanne K; Oostendorp, Rob Ab
2014-01-15
Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process.
DOT National Transportation Integrated Search
2011-07-01
The Interagency Transportation, Land Use, and Climate Change Pilot Project utilized a scenario planning process to develop a multi-agency transportation- and land use-focused development strategy for Cape Cod, Massachusetts, with the intention of ach...
THE SCHOOL SITE--ITS SELECTION, ANALYSIS, DEVELOPMENT AND MAINTENANCE.
ERIC Educational Resources Information Center
BRUNING, WALTER F.
SCHOOL ADMINISTRATORS AND COMMUNITY PLANNERS CAN AID THE SCHOOL SITE SELECTION PROCESS BY WORKING TOGETHER ON A COMMUNITY MASTER PLAN. MANY COMMUNITIES HAVE DEVELOPED SUCH A PLAN UNDER THE STATE AND FEDERALLY AIDED 701 PROGRAM. SOUND SITE SELECTION PRINCIPLES REQUIRE CONSIDERATION OF OTHER FACTORS THAN STUDENT POPULATION DISTRIBUTION. IDEALLY…
Environmentally Sound Small-Scale Forestry Projects. Guidelines for Planning.
ERIC Educational Resources Information Center
Ffolliott, Peter F.; Thames, John L.
This manual, the third in a series of publications that address community development possibilities in developing nations, provides guidelines for small-scale forestry projects that are integrative and conservation-oriented. Chapters focus on: (1) users and uses (specifying targeted audience and general objectives); (2) planning process (including…
Using the Big6[TM] To Plan Instruction and Services.
ERIC Educational Resources Information Center
Kearns, Jodi L.
2000-01-01
Explains how the relationship between school library collection development, curriculum development, and information problem solving can be improved by applying the Big6 Skills process to the selection of materials and teacher collaboration. Includes charts for cooperative planning that follow the Big6 Skills. (Contains 3 references.) (LRW)
State Appalachian Development Plans and Investment Programs for Fiscal Year 1979. Abstracts.
ERIC Educational Resources Information Center
1979
One component of the Appalachian Regional Commission's regional plan process is the annual review and approval of individual state development policies. The state summaries of proposed programs for fiscal year 1979 (for Alabama, Georgia, Kentucky, Maryland, Mississippi, New York, North Carolina, Ohio, Pennsylvania, South Carolina, Tennessee,…
Student Support through Personal Development Planning: Retrospection and Time
ERIC Educational Resources Information Center
Clegg, Sue; Bufton, Serena
2008-01-01
This article presents an analysis of higher education students' retrospective meaning making of their experiences of personal development planning (PDP). An earlier study of first year students had indicated that students rarely reflected on their own meta-cognitive processes and were preoccupied with practical study skill matters, particularly…
Career Development Strivings: Assessing Goals and Motivation in Career Decision-Making and Planning
ERIC Educational Resources Information Center
Dik, Bryan J.; Sargent, Adam M.; Steger, Michael F.
2008-01-01
This article describes and demonstrates a novel approach to assessing goals and motives among individuals engaged in the career decision-making and planning process. Participants generated five career development strivings, rated each striving along several dimensions (self-efficacy, outcome expectations, sense of calling, spiritual significance,…
Facility Master Plans: An Essential First Step in the Building Development Process.
ERIC Educational Resources Information Center
Wickerham, Wendell E.
2002-01-01
Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)
DOT National Transportation Integrated Search
2016-03-02
The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...
Strategic Planning of Technology Transfer.
ERIC Educational Resources Information Center
Groff, Warren H.
Using the Ohio Technology Transfer Organization (OTTO) as its primary example, this paper offers a strategic planning perspective on technology transfer and human resources development. First, a brief overview is provided of the maturation of mission priorities and planning processes in higher education in the United States, followed by a…
DOT National Transportation Integrated Search
2015-06-01
The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...
Educational Master Planning: Creative or Cathartic?
ERIC Educational Resources Information Center
Rossmeier, Joseph G.
Recently, Northern Virginia Community College has moved into a new era of institutional development, whereby primary attention to facility planning and increasing enrollments has given way to a comprehensive, program-based, and strategic planning process which transcends all elements of the institution. Recognition is given to the integral…
Dental manpower planning in the Indian Health Service.
Collins, R J; Broderick, E B; Herman, D J
1993-01-01
As a public health agency, the Indian Health Service (IHS) must plan for the needs of the entire American Indian and Alaskan Native (AI/AN) population and distribute resources as equitably as possible. To facilitate this process, the IHS has developed a manpower planning model to provide for the distribution of dental providers based upon the dental needs of the AI/AN population and within the limits of annual appropriations of funds. This paper briefly describes the original IHS Dental Program manpower planning model and the development of modifications over time. The need-based approach to manpower planning developed by the IHS Dental Program has exhibited utility and flexibility over time. It allows a determination of clinic size (number of operatories) and dental staffing requirements, and may be generalizable to other public health programs if an accurate assessment of utilization rate and treatment need can be made for the defined population. Nonetheless, the availability of resources in public programs is subject to the compromises inherent in the political process; thus, the use of a manpower planning model alone may not be sufficient to ensure the equitable distribution of dental resources and dental providers.
Doherty, J; Rispel, L; Webb, N
1996-12-01
This article is the second of a two-part series describing the development of a ten-year plan for primary health care facility development in Soweto. The first article concentrated on the political problems and general methodological approach of the project. This second article describes how the technical problem of planning in the context of scanty information was overcome. The reasoning behind the various assumptions and criteria which were used to assist the planning of the location of facilities is explained, as well as the process by which they were applied. The merits and limitations of this planning approach are discussed, and it is suggested that the approach may be useful to other facility planners, particularly in the developing world.
Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".
Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine
2016-07-01
Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.
Career planning and development for nurses: the time has come.
Donner, G J; Wheeler, M M
2001-06-01
Developments in how the nursing profession is perceived by nurses and by society, along with unparalleled changes in health care systems, have created an environment in which individual nurses must take control of their careers and futures. Educators, employers and professional organizations also have a key role to play in fostering the career planning and development of nurses, usually the largest employee group in most health care organizations. This article provides an overview of what career planning and development is and why it is important for nurses. A career planning and development model is described that provides nurses with a focused strategy to take greater responsibility for engaging in the ongoing planning process that is crucial throughout the major stages of their career. Finally, educators, employers and professional organizations are challenged to collaborate with individual nurses on career-development activities that will enable nurses to continue to provide high-quality care in ever-changing health care systems.
Implementing the Aquidneck Island West Side Master Plan
This report describes a technical assistance project with Aquidneck Island to develop approaches for mixed-use zoning standards, design guidelines, and review processes to implement the West Side Master Plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... aspects of the process by which the consolidated plan was developed; the identity of the agencies, groups... social service, health, and child service agencies and other entities. (c) The plan shall contain a...
NASA Astrophysics Data System (ADS)
Janichewski, S.; Ben Aı̈m, H.
2004-04-01
CNES's latest strategic plan defines the French space agency's strategic focus and charts its course for the 2001-2005 timeframe. Based on a vision of how the space sector will evolve over the period up to 2010, the Strategic Plan sets out the agency's ambition for 2005: " CNES—space technology serving society". This ambition is structured around four challenges: Focusing actions on society's needs in three areas where space technology can make a major difference—environment, science and the information society and mobility. Building the foundation for success by ensuring competitive access to space and boosting basic research and technological innovation. Strengthening national and European synergies to ensure complementarity between: the ESA European framework, which is well adapted for major projects and the development of a European Space Strategy (ESS); and the national framework to support activities of national responsibility such as defence, science and technology development, and to improve competitiveness through direct international cooperation with other space agencies. Forging effective partnerships with its research and industry partners in Europe and France to enhance performance by: developing a service culture; building partnerships; concentrating on core competencies where it can most add value; improving skills and responsiveness in line with its strategic position; ensuring transparent and rigorous management of public funds. This Strategic Plan will be implemented in the 2001-2005 timeframe at all management levels. Implementation will be eased by the fact that the plan has been drawn up through a specific process designed to make internal management aware of the analysis underlying it. This will ensure that all stakeholders understand and appropriate the plan's orientations and thus play an active role in CNES' development. This process involved five successive steps: shared assessment of the space sector's evolution, providing a common baseline from which to build on CNES's vision; shared ambition, defining the agency's objectives and strategic focus; applying lines of action at each of the agency's four space centres through specifically targeted action plans at centre and process level; setting up of a monitoring and oversight structure; definition of a communication strategy to support management of change, designed to keep all CNES personnel informed about the plan and the process behind it.
Quantifying the process and outcomes of person-centered planning.
Holburn, S; Jacobson, J W; Vietze, P M; Schwartz, A A; Sersen, E
2000-09-01
Although person-centered planning is a popular approach in the field of developmental disabilities, there has been little systematic assessment of its process and outcomes. To measure person-centered planning, we developed three instruments designed to assess its various aspects. We then constructed variables comprising both a Process and an Outcome Index using a combined rational-empirical method. Test-retest reliability and measures of internal consistency appeared adequate. Variable correlations and factor analysis were generally consistent with our conceptualization and resulting item and variable classifications. Practical implications for intervention integrity, program evaluation, and organizational performance are discussed.
Development of Waypoint Planning Tool in Response to NASA Field Campaign Challenges
NASA Technical Reports Server (NTRS)
He, Matt; Hardin, Danny; Conover, Helen; Graves, Sara; Meyer, Paul; Blakeslee, Richard; Goodman, Michael
2012-01-01
Airborne real time observations are a major component of NASA's Earth Science research and satellite ground validation studies. For mission scientists, planning a research aircraft mission within the context of meeting the science objectives is a complex task because it requires real time situational awareness of the weather conditions that affect the aircraft track. Multiple aircrafts are often involved in NASA field campaigns. The coordination of the aircrafts with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions often determines the success of the campaign. A flight planning tool is needed to provide situational awareness information to the mission scientists, and help them plan and modify the flight tracks. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool, an interactive software tool that enables scientists to develop their own flight plans (also known as waypoints) with point -and-click mouse capabilities on a digital map filled with real time raster and vector data. The development of this Waypoint Planning Tool demonstrates the significance of mission support in responding to the challenges presented during NASA field campaigns. Analysis during and after each campaign helped identify both issues and new requirements, and initiated the next wave of development. Currently the Waypoint Planning Tool has gone through three rounds of development and analysis processes. The development of this waypoint tool is directly affected by the technology advances on GIS/Mapping technologies. From the standalone Google Earth application and simple KML functionalities, to Google Earth Plugin and Java Web Start/Applet on web platform, and to the rising open source GIS tools with new JavaScript frameworks, the Waypoint Planning Tool has entered its third phase of technology advancement. The newly innovated, cross ]platform, modular designed JavaScript ]controlled Way Point Tool is planned to be integrated with NASA Airborne Science Mission Tool Suite. Adapting new technologies for the Waypoint Planning Tool ensures its success in helping scientists reach their mission objectives. This presentation will discuss the development processes of the Waypoint Planning Tool in responding to field campaign challenges, identify new information technologies, and describe the capabilities and features of the Waypoint Planning Tool with the real time aspect, interactive nature, and the resultant benefits to the airborne science community.
Development of Way Point Planning Tool in Response to NASA Field Campaign Challenges
NASA Astrophysics Data System (ADS)
He, M.; Hardin, D. M.; Conover, H.; Graves, S. J.; Meyer, P.; Blakeslee, R. J.; Goodman, M. L.
2012-12-01
Airborne real time observations are a major component of NASA's Earth Science research and satellite ground validation studies. For mission scientists, planning a research aircraft mission within the context of meeting the science objectives is a complex task because it requires real time situational awareness of the weather conditions that affect the aircraft track. Multiple aircrafts are often involved in NASA field campaigns. The coordination of the aircrafts with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions often determines the success of the campaign. A flight planning tool is needed to provide situational awareness information to the mission scientists, and help them plan and modify the flight tracks. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool, an interactive software tool that enables scientists to develop their own flight plans (also known as waypoints) with point-and-click mouse capabilities on a digital map filled with real time raster and vector data. The development of this Waypoint Planning Tool demonstrates the significance of mission support in responding to the challenges presented during NASA field campaigns. Analysis during and after each campaign helped identify both issues and new requirements, and initiated the next wave of development. Currently the Waypoint Planning Tool has gone through three rounds of development and analysis processes. The development of this waypoint tool is directly affected by the technology advances on GIS/Mapping technologies. From the standalone Google Earth application and simple KML functionalities, to Google Earth Plugin and Java Web Start/Applet on web platform, and to the rising open source GIS tools with new JavaScript frameworks, the Waypoint Planning Tool has entered its third phase of technology advancement. The newly innovated, cross-platform, modular designed JavaScript-controlled Way Point Tool is planned to be integrated with NASA Airborne Science Mission Tool Suite. Adapting new technologies for the Waypoint Planning Tool ensures its success in helping scientists reach their mission objectives. This presentation will discuss the development processes of the Waypoint Planning Tool in responding to field campaign challenges, identify new information technologies, and describe the capabilities and features of the Waypoint Planning Tool with the real time aspect, interactive nature, and the resultant benefits to the airborne science community.
Automatic treatment plan re-optimization for adaptive radiotherapy guided with the initial plan DVHs
NASA Astrophysics Data System (ADS)
Li, Nan; Zarepisheh, Masoud; Uribe-Sanchez, Andres; Moore, Kevin; Tian, Zhen; Zhen, Xin; Jiang Graves, Yan; Gautier, Quentin; Mell, Loren; Zhou, Linghong; Jia, Xun; Jiang, Steve
2013-12-01
Adaptive radiation therapy (ART) can reduce normal tissue toxicity and/or improve tumor control through treatment adaptations based on the current patient anatomy. Developing an efficient and effective re-planning algorithm is an important step toward the clinical realization of ART. For the re-planning process, manual trial-and-error approach to fine-tune planning parameters is time-consuming and is usually considered unpractical, especially for online ART. It is desirable to automate this step to yield a plan of acceptable quality with minimal interventions. In ART, prior information in the original plan is available, such as dose-volume histogram (DVH), which can be employed to facilitate the automatic re-planning process. The goal of this work is to develop an automatic re-planning algorithm to generate a plan with similar, or possibly better, DVH curves compared with the clinically delivered original plan. Specifically, our algorithm iterates the following two loops. An inner loop is the traditional fluence map optimization, in which we optimize a quadratic objective function penalizing the deviation of the dose received by each voxel from its prescribed or threshold dose with a set of fixed voxel weighting factors. In outer loop, the voxel weighting factors in the objective function are adjusted according to the deviation of the current DVH curves from those in the original plan. The process is repeated until the DVH curves are acceptable or maximum iteration step is reached. The whole algorithm is implemented on GPU for high efficiency. The feasibility of our algorithm has been demonstrated with three head-and-neck cancer IMRT cases, each having an initial planning CT scan and another treatment CT scan acquired in the middle of treatment course. Compared with the DVH curves in the original plan, the DVH curves in the resulting plan using our algorithm with 30 iterations are better for almost all structures. The re-optimization process takes about 30 s using our in-house optimization engine. This work was originally presented at the 54th AAPM annual meeting in Charlotte, NC, July 29-August 2, 2012.
Schober, Daniel J; Fawcett, Stephen B
2015-08-01
The DELTA PREP Project aims to reduce risk for intimate partner violence (IPV). It engaged leadership and staff from 19 statewide domestic violence coalitions in building capacity to prevent IPV before it occurs (rather than solely responding to IPV). This article describes the process and outcomes associated with action planning to create coalition organizational change related to preventing IPV. Coalition staff and leadership planned for organizational changes in six goal areas: leadership, structures and processes, staffing, resource development, partnership development, and member agency development. Action planning was conducted during 2-day, in-person sessions that involved (a) review and refinement of coalition vision and mission statements, (b) interpretation of coalition assessments (for prevention capacity), (c) identification of specific organizational changes to be sought, and (d) specification of action steps for each proposed organizational change to be sought. The results show overall increases in the amounts, and variations in the kinds, of organizational changes that were facilitated by coalitions. Challenges related to action planning and future directions for capacity building among statewide IPV prevention coalitions are discussed. © 2015 Society for Public Health Education.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chai, X; Liu, L; Xing, L
Purpose: Visualization and processing of medical images and radiation treatment plan evaluation have traditionally been constrained to local workstations with limited computation power and ability of data sharing and software update. We present a web-based image processing and planning evaluation platform (WIPPEP) for radiotherapy applications with high efficiency, ubiquitous web access, and real-time data sharing. Methods: This software platform consists of three parts: web server, image server and computation server. Each independent server communicates with each other through HTTP requests. The web server is the key component that provides visualizations and user interface through front-end web browsers and relay informationmore » to the backend to process user requests. The image server serves as a PACS system. The computation server performs the actual image processing and dose calculation. The web server backend is developed using Java Servlets and the frontend is developed using HTML5, Javascript, and jQuery. The image server is based on open source DCME4CHEE PACS system. The computation server can be written in any programming language as long as it can send/receive HTTP requests. Our computation server was implemented in Delphi, Python and PHP, which can process data directly or via a C++ program DLL. Results: This software platform is running on a 32-core CPU server virtually hosting the web server, image server, and computation servers separately. Users can visit our internal website with Chrome browser, select a specific patient, visualize image and RT structures belonging to this patient and perform image segmentation running Delphi computation server and Monte Carlo dose calculation on Python or PHP computation server. Conclusion: We have developed a webbased image processing and plan evaluation platform prototype for radiotherapy. This system has clearly demonstrated the feasibility of performing image processing and plan evaluation platform through a web browser and exhibited potential for future cloud based radiotherapy.« less
Carey, Rachel; Caraher, Martin; Lawrence, Mark; Friel, Sharon
2016-01-01
The present article tracks the development of the Australian National Food Plan as a 'whole of government' food policy that aimed to integrate elements of nutrition and sustainability alongside economic objectives. The article uses policy analysis to explore the processes of consultation and stakeholder involvement in the development of the National Food Plan, focusing on actors from the sectors of industry, civil society and government. Existing documentation and submissions to the Plan were used as data sources. Models of health policy analysis and policy streams were employed to analyse policy development processes. Australia. Australian food policy stakeholders. The development of the Plan was influenced by powerful industry groups and stakeholder engagement by the lead ministry favoured the involvement of actors representing the food and agriculture industries. Public health nutrition and civil society relied on traditional methods of policy influence, and the public health nutrition movement failed to develop a unified cross-sector alliance, while the private sector engaged in different ways and presented a united front. The National Food Plan failed to deliver an integrated food policy for Australia. Nutrition and sustainability were effectively sidelined due to the focus on global food production and positioning Australia as a food 'superpower' that could take advantage of the anticipated 'dining boom' as incomes rose in the Asia-Pacific region. New forms of industry influence are emerging in the food policy arena and public health nutrition will need to adopt new approaches to influencing public policy.
Development of experimental facilities for processing metallic crystals in orbit
NASA Technical Reports Server (NTRS)
Duncan, Bill J.
1990-01-01
This paper discusses the evolution, current status, and planning for facilities to exploit the microgravity environment of earth orbit in applied metallic materials science. Space-Shuttle based facilities and some precursor flight programs are reviewed. Current facility development programs and planned Space Station furnace capabilities are described. The reduced gravity levels available in earth orbit allow the processing of metallic materials without the disturbing influence of gravitationally induced thermal convection, stratification due to density differences in sample components, or the effects of hydrostatic pressure.
Selected Economic Translations on Czechoslovakia (9th in the Series).
1960-09-01
and Its Development in the Third Five-Year Plan.,. 1 Gas Production and the Tasks of the Third Five-Year Plan» *<, <,*••..«........ e...USE ONLY C7.ECH0 SLOVAKIA Coal Processing In Czechoslovakia, and Its Development in the Third Flve-Year^laiT [The following is a translation of...struction during the Third Five-Year Plari in the coal- processing sectors which in size and scope ;has never been matched by our country before. The
The Way Point Planning Tool: Real Time Flight Planning for Airborne Science
NASA Technical Reports Server (NTRS)
He, Yubin; Blakeslee, Richard; Goodman, Michael; Hall, John
2012-01-01
Airborne real time observation are a major component of NASA's Earth Science research and satellite ground validation studies. For mission scientist, planning a research aircraft mission within the context of meeting the science objective is a complex task because it requires real time situational awareness of the weather conditions that affect the aircraft track. Multiple aircraft are often involved in the NASA field campaigns the coordination of the aircraft with satellite overpasses, other airplanes and the constantly evolving dynamic weather conditions often determine the success of the campaign. A flight planning tool is needed to provide situational awareness information to the mission scientist and help them plan and modify the flight tracks successfully. Scientists at the University of Alabama Huntsville and the NASA Marshal Space Flight Center developed the Waypoint Planning Tool (WPT), an interactive software tool that enables scientist to develop their own flight plans (also known as waypoints), with point and click mouse capabilities on a digital map filled with time raster and vector data. The development of this Waypoint Planning Tool demonstrates the significance of mission support in responding to the challenges presented during NASA field campaigns. Analyses during and after each campaign helped identify both issues and new requirements, initiating the next wave of development. Currently the Waypoint Planning Tool has gone through three rounds of development and analysis processes. The development of this waypoint tool is directly affected by the technology advances on GIS/Mapping technologies. From the standalone Google Earth application and simple KML functionalities to the Google Earth Plugin and Java Web Start/Applet on web platform, as well as to the rising open source GIS tools with new JavaScript frameworks, the Waypoint planning Tool has entered its third phase of technology advancement. The newly innovated, cross-platform, modular designed JavaScript-controled Waypoint tool is planned to be integrated with the NASA Airborne Science Mission Tool Suite. Adapting new technologies for the Waypoint Planning Tool ensures its success in helping scientist reach their mission objectives. This presentation will discuss the development process of the Waypoint Planning Tool in responding to field campaign challenges, identifying new information technologies, and describing the capabilities and features of the Waypoint Planning Tool with the real time aspect, interactive nature, and the resultant benefits to the airborne science community.
Sridharan, Sanjeev; Go, Sodam; Zinzow, Heidi; Gray, Aracelis; Barrett, Melissa Gutierrez
2007-02-01
In order to achieve the intended impact on a community, comprehensive community initiatives must sustain programs once they have been implemented. However, planning for sustainability is challenging and is rarely incorporated in the planning process of an initiative. The current study examined 19 5-year plans developed during the planning phase of the Comprehensive Strategy for Serious, Violent and Chronic Juvenile Offenders. Quantitative and qualitative methods were employed to assess the extent to which the construct of sustainability was incorporated. The plan analysis was supplemented with results from other components of the complex evaluation design implemented as part of the process evaluation of Comprehensive Strategy. Results suggested that sustainability was not accounted for during the planning phase of this initiative. The implications of these findings, including the importance of planning for sustainability in order to achieve sustainability, are discussed.
Developing nursing care plans.
Ballantyne, Helen
2016-02-24
This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.
44 CFR 201.6 - Local Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agencies that have the authority to regulate development, as well as businesses, academia and other private... the mitigation plan within a five-year cycle. (ii) A process by which local governments incorporate...
A neo-strategic planning approach to enhance local tobacco control programs.
Douglas, Malinda R; Carter, Sara Sally R; Wilson, Andrew P; Chan, Andie
2015-01-01
Research in tobacco control demonstrating best practices is widely disseminated; however, application at the local level is often difficult. Translating research into practice requires a concerted effort to develop an understanding of the evidence and how it can be applied within diverse contexts. A strategic planning infrastructure was developed to support the translation of evidence-based interventions into community practice. This paper highlights the strategic process of turning "know-what" into "know-how" to facilitate the strategic planning and implementation of tobacco control best practices at the local level. The purpose, people, process, and product strategies of knowledge management and translation provided a framework for the strategic planning infrastructure. The knowledge translation concepts of audience, motivations, and mechanisms were synergized in the neo-strategic planning component design. The participants were 20 community coalitions funded to implement local tobacco control programs. From 2004 to 2011, the strategic planners facilitated a cyclical process to translate research into practice using a trio of integrated tools, skill-building workshops on strategic planning, and grantee-driven technical assistance and consultation. In the short term, the usefulness of the strategic planning components to the programs was measured. The intermediate outcome was the successful movement of the community programs from the planning stage to the implementation stage. The achievement of community-level changes in planned tobacco control efforts was the overall outcome measure for the success of the local coalitions. Seventeen of 20 communities that began the planning process implemented strategic plans. All 17 of the programs implemented evidence-based practices, resulting in numerous tobacco-free policies, increased cessation, and increased support from the media and community. Bridging the gap between research and practice can enhance the practicality, efficiency, and effectiveness of tobacco control programs at the local level, maximizing the potential positive health impact. Copyright © 2015 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.
Technical Potential Assessment for the Renewable Energy Zone (REZ) Process: A GIS-Based Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Nathan; Roberts, Billy J
Geographic Information Systems (GIS)-based energy resource and technical potential assessments identify areas capable of supporting high levels of renewable energy (RE) development as part of a Renewable Energy Zone (REZ) Transmission Planning process. This document expands on the REZ Process to aid practitioners in conducting GIS-based RE resource and technical potential assessments. The REZ process is an approach to plan, approve, and build transmission infrastructure that connects REZs - geographic areas that have high-quality RE resources, suitable topography and land-use designations, and demonstrated developer interest - to the power system. The REZ process helps to increase the share of solarmore » photovoltaic (PV), wind, and other resources while also maintaining reliability and economics.« less
Succession Planning and Management: The Backbone of the Radiology Group's Future.
Donner, E Michael; Gridley, Daniel; Ulreich, Sidney; Bluth, Edward I
2017-01-01
The transition of leadership within radiology practices is often not a planned replacement process with formal development of potential future leaders. To ensure their ongoing success, however, practices need to develop comprehensive succession plans that include a robust developmental program for potential leaders consisting of mentoring, coaching, structured socialization, 360-degree feedback, developmental stretch assignments, job rotation, and formal education. Succession planning and leadership development will be necessary in the future for a practice to be successful in its business relationships and to be financially viable. Copyright © 2016 American College of Radiology. Published by Elsevier Inc. All rights reserved.
Strategic Planning in an Educational Development Centre: Motivation, Management, and Messiness
ERIC Educational Resources Information Center
Albon, Simon P.; Iqbal, Isabeau; Pearson, Marion L.
2016-01-01
Strategic planning in universities is frequently positioned as vital for clarifying future directions, providing a coherent basis for decision-making, establishing priorities, and improving organizational performance. Models for successful strategic planning abound and often present the process as linear and straightforward. In this essay, we…
No Free Lunch: A Condensed Strategic Planning Process
ERIC Educational Resources Information Center
Kohrmann, Patrick C., II
2008-01-01
Most people picture "strategic planning" as endless meetings spent doing SWOT (strengths, weaknesses, opportunities, and threats) analyses, crafting vision and mission statements, and developing goals and action plans. Few look forward to the experience or reflect back on it with pleasure. In this article, the author describes how he…
QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY
EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...
ERIC Educational Resources Information Center
Bernheim, Anthony
2003-01-01
Proposes structured workshops as the method to integrate green planning seamlessly into campus building planning. Explains that green rating systems, such as Leadership in Energy and Environmental Design (LEED), offer specific ways to gauge the environmental effectiveness of green measures. (EV)
36 CFR 219.7 - New plan development or plan revision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... importance of various physical, biological, social, cultural, and historic resources on the plan area (§ 219... desired condition is a description of specific social, economic, and/or ecological characteristics of the... intent, other than desired conditions, usually related to process or interaction with the public. Goals...
36 CFR 219.7 - New plan development or plan revision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... importance of various physical, biological, social, cultural, and historic resources on the plan area (§ 219... desired condition is a description of specific social, economic, and/or ecological characteristics of the... intent, other than desired conditions, usually related to process or interaction with the public. Goals...
36 CFR 219.7 - New plan development or plan revision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... importance of various physical, biological, social, cultural, and historic resources on the plan area (§ 219... desired condition is a description of specific social, economic, and/or ecological characteristics of the... intent, other than desired conditions, usually related to process or interaction with the public. Goals...
DOT National Transportation Integrated Search
2016-03-11
The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...
DOT National Transportation Integrated Search
2016-03-11
The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...
Technology-Based Lesson Plans: Preparation and Description
ERIC Educational Resources Information Center
Kubilinskiene, Svetlana; Dagiene, Valentina
2010-01-01
A lesson plan is an important methodological component of the learning process. The key purpose of the article is to analyse the current situation and suggest how the information technologies can assist in the development of lesson plans, their accumulation and retrieval, thus ensuring their effective application. The authors disclose the problems…
PLANNING THE COMMUNITY COLLEGE.
ERIC Educational Resources Information Center
1967
A COMMUNITY COLLEGE MASTER PLAN (1) SHOULD BE UNIQUE, DESIGNED FOR ITS PARTICULAR SITUATION, (2) DEVELOPS FROM AN ANALYSIS OF NEEDS, SITE, GROWTH, AND FINANCE, (3) STARTS WITH A REVIEW OF FACTS, RESOURCES, NEEDS, AND INFLUENCES, TO GIVE A FOUNDATION FOR THE CREATIVE PLANNING PROCESS, AND (4) IS INFLUENCED BY FACTORS OF EDUCATIONAL PROGRAM,…
Strategic Planning Methodology for Financial Management in the Department of the Navy
1983-05-24
objectives for accounting and financial management systems improvement for the Department of the Navy (DON) and for developing DON policy for overall...Strategic Financial Management Plan, in which we have provided recommendations for improving the planning process. This wedge packet is intended to provide a
Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…
Tying Resource Allocation and TQM into Planning and Assessment Efforts.
ERIC Educational Resources Information Center
Mullendore, Richard H.; Wang, Li-Shing
1996-01-01
Describes the evolution of a model, developed by student affairs officials, which outlines a planning process for implementing Total Quality Management. Presents step-by-step instructions for the model's deployment and discusses such issues as transitions, planning forms, goals, and professional and personal growth needs. (RJM)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
.... These refuges are currently being managed under Comprehensive Management Plans developed in the mid... of our intentions, and to obtain suggestions and information on the scope of issues to consider in the planning process of revising the management plans for these refuges. DATES: To ensure...
Integrated Advanced Sounding Unit-A (AMSU-A). Configuration Management Plan
NASA Technical Reports Server (NTRS)
Cavanaugh, J.
1996-01-01
The purpose of this plan is to identify the baseline to be established during the development life cycle of the integrated AMSU-A, and define the methods and procedures which Aerojet will follow in the implementation of configuration control for each established baseline. Also this plan establishes the Configuration Management process to be used for the deliverable hardware, software, and firmware of the Integrated AMSU-A during development, design, fabrication, test, and delivery.
Institutional Mapping Towards Developing a Framework for Sustainable Marine Spatial Planning
NASA Astrophysics Data System (ADS)
Yatim, M. H. M.; Omar, A. H.; Abdullah, N. M.; Hashim, N. M.
2016-09-01
Within few years before, the urge to implement the marine spatial planning is due to increasing numbers of marine activities that will lead into uncertainties of rights, restrictions and responsibilities of the maritime nations. Marine authorities in this situation that deal with national rights and legislations are the government institutions that engage with marine spatial information. There are several elements to be considered when dealing with the marine spatial planning; which is institutional sustainability governance. Providing the importance of marine spatial planning towards sustainable marine spatial governance, the focus should highlight the role marine institutions towards sustainable marine plan. The iterative process of marine spatial planning among marine institutions is important as the spatial information governance is scattered from reflected rights, restrictions and responsibilities of marine government institutions. Malaysia is one of the maritime nations that conjures the initial step towards establishing the sustainable marine spatial planning. In order to have sustainable institutions in marine spatial planning process, it involves four main stages; planning phase, plan evaluation phase, implementation phase and post implementation phase. Current situation has witnessed the unclear direction and role of marine government institutions to manage the marine spatial information. This review paper is focusing on the institutional sustainability upon interaction of marine government institutions in the marine spatial planning process based on Institutional Analysis Framework. The outcome of the integration of institutional sustainability and marine spatial planning process will propose a framework of marine institutional sustainable plan.
Core Curriculum Revision at TCU: How Faculty Created and Are Maintaining the TCU Core Curriculum
ERIC Educational Resources Information Center
McNertney, Edward; Ferrandino, Blaise
2010-01-01
The initiative to revise Texas Christian University's (TCU) general education curriculum was one of the outcomes of an institutional strategic planning process in 2000, the Commission on the Future of TCU. Coincident with this planning process, TCU developed a new institutional mission statement that focused on preparing students for becoming…
The Process of Retirement Planning Scale (PRePS): Development and Validation
ERIC Educational Resources Information Center
Noone, Jack H.; Stephens, Christine; Alpass, Fiona
2010-01-01
Although a substantial proportion of the western population is approaching retirement age, little is known about how they are preparing for the future. Much attention has been paid to the consumption of educational material and retirement wealth in the present literature, but the process of retirement planning has been ignored. S. L. Friedman and…
ERIC Educational Resources Information Center
Stodden, Robert A.; And Others
1989-01-01
Educational records of 127 secondary students with disabilities were reviewed to assess impact of vocational assessment information in Individualized Education Plan (IEP) development process. Results focus on the impact of information on the number of IEP vocational goals and objectives written, kinds of IEP items written, and number of IEP goals…
ERIC Educational Resources Information Center
Wright, Phillip C.; Geroy, Gary D.
Exploring existing methodologies to determine whether they can be adapted or adopted to support strategic goal setting, this paper focuses on information gathering techniques as they relate to the human resource development professional's input into strategic planning processes. The information gathering techniques are all qualitative methods and…
Charting a path to efficiencies following a merger.
Klar, Brandon; Shufelt, Gregory P
2015-06-01
Health systems can access the full range of opportunities for enhanced efficiencies following a merger or an acquisition by pursuing the following five-step process, which constitutes the development of a business plan of operational efficiencies: Secure executive sponsorship and involvement. Establish an integration steering committee. Develop guiding principles. Identify and validate potential efficiencies. Develop an action plan for each department and function.
ERIC Educational Resources Information Center
Byler, Bennie L.; Hemp, Paul E.
Among the most crucial problems facing young people today are decisions in the process of vocational development. This study was designed to determine if there are differences in certain aspects of vocational development among the groups of high school agriculture students who plan to enter on-farm agricultural occupations, those who plan to enter…
2011-01-01
Background Inequalities in health have proved resistant to 'top down' approaches. It is increasingly recognised that health promotion initiatives are unlikely to succeed without strong local involvement at all stages of the process and many programmes now use grass roots approaches. A healthy living approach to community development (HLA) was developed as an innovative response to local concerns about a lack of appropriate services in two deprived communities in Pembrokeshire, West Wales. We sought to assess feasibility, costs, benefits and working relationships of this HLA. Methods The HLA intervention operated through existing community forums and focused on the whole community and its relationship with statutory and voluntary sectors. Local people were trained as community researchers and gathered views about local needs though resident interviews. Forums used interview results to write action plans, disseminated to commissioning organisations. The process was supported throughout through the project. The evaluation used a multi-method before and after study design including process and outcome formative and summative evaluation; data gathered through documentary evidence, diaries and reflective accounts, semi-structured interviews, focus groups and costing proformas. Main outcome measures were processes and timelines of implementation of HLA; self reported impact on communities and participants; community-agency processes of liaison; costs. Results Communities were able to produce and disseminate action plans based on locally-identified needs. The process was slower than anticipated: few community changes had occurred but expectations were high. Community participants gained skills and confidence. Cross-sector partnership working developed. The process had credibility within service provider organisations but mechanisms for refocusing commissioning were patchy. Intervention costs averaged £58,304 per community per annum. Conclusions The intervention was feasible and inexpensive, with indications of potential impact at individual, community and policy planning levels. However, it is a long term process which requires sustained investment and must be embedded in planning and service delivery processes. PMID:21223586
ERIC Educational Resources Information Center
McCready, John W.
2010-01-01
The purpose of this study was to examine use of decision-making tools and feedback in strategic planning in order to develop a rigorous process that would promote the efficiency of strategic planning for acquisitions in the United States Coast Guard (USCG). Strategic planning is critical to agencies such as the USCG in order to be effective…
FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2012
2012-01-01
The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…
FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2011
2011-01-01
The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…
Preparing the Army for Stability Operations: Doctrinal and Interagency Issues
2007-01-01
discuss these issues at length in Chapter Three). Similarly, the Draft Planning Framework is not yet part of the military planning process. It remains a...Draft Planning Framework for Reconstruction, Stabilization, and Conflict Transformation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 The...level from the perspective of impli- cations for the Army and its development of SSTR capabilities. The U.S. Government Draft Planning Framework for
FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2006
2006-01-01
The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals
2000-04-01
formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate
Using deliberative techniques to engage the community in policy development.
Gregory, Judy; Hartz-Karp, Janette; Watson, Rebecca
2008-07-16
This paper examines work in deliberative approaches to community engagement used in Western Australia by the Department of Planning and Infrastructure and other planning and infrastructure agencies between 2001 and 2005, and considers whether the techniques could be applied to the development of health policy in Australia. Deliberative processes were used in WA to address specific planning and infrastructure problems. Using deliberative techniques, community participants contributed to joint decision making and policy development. Outcomes from deliberative processes were seriously considered by the Minister and used to influence policy decisions. In many cases, the recommendations generated through deliberative processes were fully adopted by the Minister. The experiences in WA demonstrate that deliberative engagement processes can be successfully implemented by government and can be used to guide policy. The techniques can be adapted to suit the context and issues experienced by a portfolio, and the skills required to conduct deliberative processes can be fostered amongst the portfolio's staff. Health policy makers may be able to learn from the experiences in WA, and adopt approaches to community engagement that allow for informed deliberation and debate in the community about the future of Australia's health system.
15 CFR 923.25 - Shoreline erosion/mitigation planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... purpose in developing this planning process is to give special attention to erosion issues. This special management attention may be achieved by designating erosion areas as areas of particular concern pursuant to...
GPS adjacent-band compatibility assessment plan.
DOT National Transportation Integrated Search
2012-12-01
The Federal Aviation Administration (FAA) and the Research and Innovative Technology : Administration (RITA), both operating Administrations of the DOT, developed this Plan to : provide the framework for definition of the processes and assumptions th...
Connected Vehicle Impacts on Transportation Planning—Desk Reference.
DOT National Transportation Integrated Search
2016-06-01
The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Che Xiuzhen, E-mail: chexiuzhen@sohu.com; English, Alex; Lu Jia
The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully andmore » rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: {center_dot}as a tool and process for achieving more sustainable and strategic planning; {center_dot}to determine the level of integration of SEA within the planning system; and, {center_dot}its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.« less
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-05-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-02-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Peltier, J W; Kleimenhagen, A K; Naidu, G M
1996-01-01
The mission of a health care organization represents its vision for the future. The authors present an approach used to develop an organizational mission for a large multispecialty physician clinic. In implementing the strategic planning process, research objectives must be clearly stated that identify in advance how the data will be used. Failure to integrate strategic data from all relevant publics will likely result in a mission statement that misses the significant interests of one or more stakeholders and reduces the effectiveness of the strategic planning process. Although costly, comprehensive research can uncover some surprising differences in perception that, if ignored, might complete defeat strategic planning efforts.
Motivations and Barriers for Policymakers to Developing State Adaptation Plans
NASA Astrophysics Data System (ADS)
Miller, R.; Sylak-Glassman, E.
2016-12-01
Current approaches for developing high-quality adaptation plan require significant resources. In recent years, communities have grown to embrace adaptive plans across multiple forms, including adaptive capacity assessments, resilience strategies, and vulnerability assessments. Across the United States, as of this writing, 14 states have established adaptation plans, with another 8 states having begun the process. Given the high resources requirements and increasing interest in the development of adaptation plans, we aim to examine patterns behind the establishment of resilience plans at the state level. We examine demographic, financial, political, and physical characteristics associated with different states in an effort to explore the reasoning behind investing in the development of adaptation plans. This analysis considers quantitative and qualitative factors, including recent elections for political parties, politicians' climate-related statements and campaign promises, demographics, budgets, and regional climate threats. The analysis aims to identify motivations for state leadership taking action to develop adaptation plans. Results from the analysis seek to identify the primary drivers and barriers associated with state-wide resilience planning. These results could inform the design of scientific communication tools or approaches to aid future adaptation responses to climate change.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mobrand, Lars Erik; Lestelle, Lawrence C.
In the spring of 1994 a technical planning support project was initiated by the Grande Ronde Model Watershed Board of Directors (Board) with funding from the Bonneville Power Administration. The project was motivated by a need for a science based method for prioritizing restoration actions in the basin that would promote effectiveness and accountability. In this section the authors recall the premises for the project. The authors also present a set of recommendations for implementing a watershed planning process that incorporates a science-based framework to help guide decision making. This process is intended to assist the Grande Ronde Model Watershedmore » Board in its effort to plan and implement watershed improvement measures. The process would also assist the Board in coordinating its efforts with other entities in the region. The planning process is based on an approach for developing an ecosystem management strategy referred to as the Ecosystem Diagnosis and Treatment (EDT) method (Lichatowich et al. 1995, Lestelle et al. 1996). The process consists of an on-going planning cycle. Included in this cycle is an assessment of the ability of the watershed to support and sustain natural resources and other economic and societal values. This step in the process, which the authors refer to as the diagnosis, helps guide the development of actions (also referred to as treatments) aimed at improving the conditions of the watershed to achieve long-term objectives. The planning cycle calls for routinely reviewing and updating, as necessary, the basis for the diagnosis and other analyses used by the Board in adopting actions for implementation. The recommendations offered here address this critical need to habitually update the information used in setting priorities for action.« less
NASA Astrophysics Data System (ADS)
Dolotovskii, I. V.; Dolotovskaya, N. V.; Larin, E. A.
2018-05-01
The article presents the architecture and content of a specialized analytical system for monitoring operational conditions, planning of consumption and generation of energy resources, long-term planning of production activities and development of a strategy for the development of the energy complex of gas processing enterprises. A compositional model of structured data on the equipment of the main systems of the power complex is proposed. The correctness of the use of software modules and the database of the analytical system is confirmed by comparing the results of measurements on the equipment of the electric power system and simulation at the operating gas processing plant. A high accuracy in the planning of consumption of fuel and energy resources has been achieved (the error does not exceed 1%). Information and program modules of the analytical system allow us to develop a strategy for improving the energy complex in the face of changing technological topology and partial uncertainty of economic factors.