Science.gov

Sample records for development project analisi

  1. CHP Project Development

    EPA Pesticide Factsheets

    Access information and tools to support the CHP project development process, including identifying if your facility is a good fit for CHP, the steps involved with CHP project development, and policies and incentives supportive of CHP.

  2. Robotic Lander Development Project

    NASA Image and Video Library

    The Robotic Lander Development Project at the Marshall Center is testing a prototype lander that will aid in the design and development of a new generation of small, smart, versatile robotic lander...

  3. Energy Efficiency Project Development

    SciTech Connect

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through

  4. Renewable energy project development

    SciTech Connect

    Ohi, J.

    1996-12-31

    The author presents this paper with three main thrusts. The first is to discuss the implementation of renewable energy options in China, the second is to identify the key project development steps necessary to implement such programs, and finally is to develop recommendations in the form of key issues which must be addressed in developing such a program, and key technical assistance needs which must be addressed to make such a program practical.

  5. The Child Development Project.

    ERIC Educational Resources Information Center

    Developmental Studies Center, San Ramon, CA.

    In the context of a regular academic program, the Child Development Project (CDP) helps teachers and parents promote characteristics such as helpfulness and responsibility in children in kindergarten through sixth grade. The CDP program contains five major elements: (1) cooperative activities; (2) helping activities; (3) the highlighting of…

  6. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  7. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  8. Project-Based Module Development.

    ERIC Educational Resources Information Center

    Meel, R. M. van

    A project management design for modularizing higher education at open universities was developed and tested. Literature in the fields of project management and development of modular curriculum materials was reviewed and used as a basis for developing a project-based approach to the process of developing modules for self-instruction. According to…

  9. Developing Government Renewable Energy Projects

    SciTech Connect

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  10. Guidelines for CSM project development.

    PubMed

    1983-01-01

    This document summarizes guidelines for contraceptive social marketing project development prepared by the International Contraceptive Social Marketing Project (ICSMP) as an aid to consultants and technical assistance contractors. The ICSMP has developed a checklist to guide planning in 4 major areas: 1) project organization and management structure, 2) target market, 3) product line, and 4) pricing strategy and project costs. A clear statement of project objectives is essential, and these objectives must be internally consistent so that strategies to accomplish them can be unified. The position of each governmental entity and sponsoring agency involved in the social marketing project must be clearly understood. Projects receiving US government funds must have a mechanism for financial and programmatic reporting and accountability. Thorough knowledge of commercial rules and regulations in a country is necessary for planning. To ascertain whether the necessary resources are available, it is necessary to examine the existing marketing infrastructure in terms of distribution, advertising, market research, and packagaing capabilities. The target market should be specified in quantifiable terms; in addition, a consumer profile that defines the overall demographics of the country, the family planning environment, and potential social marketing consumers should be developed. The couple years of protection projection can be translated into the percentage of the target market that the project expects to capture. It is necessary to price products early in project development in order to assess program costs. Revenue projections should be based on previous calculations of couple year of protection goals, product line, product price, and price structure. Each element of the advertsing budget should be justifiable in terms of project objectives. Finally, positions and anticpated salaries for staff should be specified through the 1st 3 years of project implementation.

  11. Collection Development Project.

    ERIC Educational Resources Information Center

    Nuby, Mary

    Undertaken to provide data on the current status of collection development in selected academic libraries, this study also analyzed the structure of the collection development function at Chicago Academic Library Council (CALC) institutions and outlined a formal collection development policy for Chicago State University's Douglas Library.…

  12. Collection Development Project.

    ERIC Educational Resources Information Center

    Nuby, Mary

    Undertaken to provide data on the current status of collection development in selected academic libraries, this study also analyzed the structure of the collection development function at Chicago Academic Library Council (CALC) institutions and outlined a formal collection development policy for Chicago State University's Douglas Library.…

  13. 75 FR 22674 - Moynihan Station Development Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... Federal Railroad Administration Moynihan Station Development Project AGENCY: Federal Railroad... comment period for the Moynihan Station Development Project Environmental Assessment. SUMMARY: The Federal Railroad Administration announces the availability of the Moynihan Station ] Development Project (Project...

  14. Technology development in space projects

    NASA Astrophysics Data System (ADS)

    Kelhae, Vaeinoe; Kurki, Jouko

    1993-01-01

    Space activities have existed for 34 years around the world. Demanding technology operating in extreme conditions has been developed for space projects, instruments, satellites and shuttles. The nature of space technology is basic development and it also serves well the purposes of conventional, industrial and commercial applications. ESA's industrial return makes it possible for the industry and research organizations to participate in space projects. In that way, Finland has a possibility to widen its technological know-how base, get technology knowledge for developing new commercial products, and get a base for controlling quality. Many of the space instrument and Earth observation projects (for example, GOMOS ozone analyzer) are also socially important.

  15. Project Success in Agile Development Software Projects

    ERIC Educational Resources Information Center

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  16. Project Success in Agile Development Software Projects

    ERIC Educational Resources Information Center

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  17. Catalyzing RE Project Development

    SciTech Connect

    Anderson, Kate; Elgqvist, Emma; Walker, Andy; Cutler, Dylan; Olis, Dan; DiOrio, Nick; Simpkins, Travis

    2016-09-01

    This poster details how screenings done with REopt - NREL's software modeling platform for energy systems integration and optimization - are helping to catalyze the development of hundreds of megawatts of renewable energy.

  18. The Physics Computer Development Project.

    ERIC Educational Resources Information Center

    Bork, Alfred M.; Ballard, Richard

    This paper describes the design, development and use of computer-based teaching materials in the Physics Computer Development Project at the University of California at Irvine. The decision was made to develop dialogs and simulations related to existing material using the computational mode. The principal thrust has been in wave motion and…

  19. Incentive contracts for development projects

    NASA Astrophysics Data System (ADS)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  20. SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROJECT.

    ERIC Educational Resources Information Center

    BOICE, JOHN,; AND OTHERS

    ONE-HUNDRED MANUFACTURERS EXPRESSED INTEREST IN BIDDING FOR A SYSTEM ON SCHOOL CONSTRUCTION CALLED SCSD OR SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT TO THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS. TWENTY-TWO BUILDINGS COMPRISED THE PROJECT. THE OBJECTIVE WAS TO DEVELOP AN INTEGRATED SYSTEM OF STANDARD SCHOOL BUILDING COMPONENTS…

  1. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  2. Wisconsin's Mathematics Talent Development Project.

    ERIC Educational Resources Information Center

    Rolland, Al; Schuster, Nancy

    1988-01-01

    The Mathematics Talent Development Project offers accelerated mathematics to students aged 10-14, on Saturdays at the University of Wisconsin-Eau Claire. Four years of high-school mathematics are covered in two years, including algebra, geometry, trigonometry, and statistics. Described are student selection, importance of homework, and teacher…

  3. Hualapai Tribal Utility Development Project

    SciTech Connect

    Hualapai Tribal Nation

    2008-05-25

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon

  4. The Project-Oriented Matrix and Instructional Development Project Management.

    ERIC Educational Resources Information Center

    Clymer, E. William

    1984-01-01

    Describes organizational factors that influence most instructional development projects, relates them to the features of the project-oriented matrix, and lists and explains specific matrix management strategies that instructional developers can use to solve common management problems. (MBR)

  5. The Project-Oriented Matrix and Instructional Development Project Management.

    ERIC Educational Resources Information Center

    Clymer, E. William

    1984-01-01

    Describes organizational factors that influence most instructional development projects, relates them to the features of the project-oriented matrix, and lists and explains specific matrix management strategies that instructional developers can use to solve common management problems. (MBR)

  6. Space market model development project

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.

    1987-01-01

    The objectives of the research program, Space Market Model Development Project, (Phase 1) were: (1) to study the need for business information in the commercial development of space; and (2) to propose a design for an information system to meet the identified needs. Three simultaneous research strategies were used in proceeding toward this goal: (1) to describe the space business information which currently exists; (2) to survey government and business representatives on the information they would like to have; and (3) to investigate the feasibility of generating new economical information about the space industry.

  7. Advanced Software Development Workstation Project

    NASA Technical Reports Server (NTRS)

    Lee, Daniel

    1989-01-01

    The Advanced Software Development Workstation Project, funded by Johnson Space Center, is investigating knowledge-based techniques for software reuse in NASA software development projects. Two prototypes have been demonstrated and a third is now in development. The approach is to build a foundation that provides passive reuse support, add a layer that uses domain-independent programming knowledge, add a layer that supports the acquisition of domain-specific programming knowledge to provide active support, and enhance maintainability and modifiability through an object-oriented approach. The development of new application software would use specification-by-reformulation, based on a cognitive theory of retrieval from very long-term memory in humans, and using an Ada code library and an object base. Current tasks include enhancements to the knowledge representation of Ada packages and abstract data types, extensions to support Ada package instantiation knowledge acquisition, integration with Ada compilers and relational databases, enhancements to the graphical user interface, and demonstration of the system with a NASA contractor-developed trajectory simulation package. Future work will focus on investigating issues involving scale-up and integration.

  8. Automotive Stirling Engine Development Project

    NASA Technical Reports Server (NTRS)

    Ernst, William D.; Shaltens, Richard K.

    1997-01-01

    The development and verification of automotive Stirling engine (ASE) component and system technology is described as it evolved through two experimental engine designs: the Mod 1 and the Mod 2. Engine operation and performance and endurance test results for the Mod 1 are summarized. Mod 2 engine and component development progress is traced from the original design through hardware development, laboratory test, and vehicle installation. More than 21,000 hr of testing were accomplished, including 4800 hr with vehicles that were driven more dm 59,000 miles. Mod 2 engine dynamometer tests demonstrated that the engine system configuration had accomplished its performance goals for power (60 kW) and efficiency (38.5%) to within a few percent. Tests with the Mod 2 engine installed in a delivery van demonstrated combined metro-highway fuel economy improvements consistent with engine performance goals and the potential for low emission levels. A modified version of the Mod 2 has been identified as a manufacturable design for an ASE. As part of the ASE project, the Industry Test and Evaluation Program (ITEP), NASA Technology Utilization (TU) project, and the industry-funded Stirling Natural Gas Engine program were undertaken to transfer ASE technology to end users. The results of these technology transfer efforts are also summarized.

  9. Media Development Project for the Hearing Impaired.

    ERIC Educational Resources Information Center

    Stepp, Robert E.; And Others

    1978-01-01

    The Media Development Project for the Hearing Impaired is a project to serve the educational technology needs of the deaf and hard of hearing population, by identifying, adapting, developing, and evaluating the effectiveness of instructional media and materials. (BD)

  10. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  11. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  12. Energy requirements of development projects

    SciTech Connect

    Jones, D.W.; Samuels, G. Jr.

    1988-01-01

    This report focuses on the energy requirements of pumped irrigation and cement plants as examples of the energy operating requirements of large development projects. Based on conservative assumptions about the nearness of the water table to the surface and the efficiency of operating pumping systems, using pumped irrigation to increase by 5% the arable land area of the countries studied would require energy equivalent to 4-1/2% to 8-1/2% of 1980 energy imports or commercial energy consumption of four of the countries; Somalia and Chad would require 15% and 22% of their 1980 oil import or consumption levels - partly because of relatively large, marginally arable land areas and partly because of low energy imports (commercial consumption). The introduction of one or (at most) two moderate-sized cement plants into five West African countries and Sudan requires from 12% to 40% of those countries' 1980 national commercial energy consumption for their operation. These calculations assume high levels of maintenance and developed country standards of fuel efficient operation; therefore actual fuel requirements are likely to be higher. The countries studied have few or no domestic fuel supply options other than imports. 2 figs., 2 tabs.

  13. The Personnel Development and Planning Project.

    ERIC Educational Resources Information Center

    Stakenas, Robert; And Others

    1979-01-01

    The purpose of the project is to identify goals for vocational education in Florida through the year 2000 and to develop a system plan for achieving them. Project components are leadership and project coordination, staff development, a planning team, needs assessment surveys, futures research, an economic utility model, and dissemination and…

  14. The Wisconsin Rural Development Demonstration Project.

    ERIC Educational Resources Information Center

    McCoy, Palmer E.; Jones, Eleanor

    Nineteen Wisconsin counties were the site of the four-year Rural Development Demonstration Project, one of five such projects in the nation. Among the project's objectives were to accelerate sound economic, social, cultural and environmental development and to provide alternatives for living in non-metropolitan areas while providing greater…

  15. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Project development. 550.16 Section 550.16 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects...

  16. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project development. 660.112 Section 660.112 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by...

  17. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Project development. 550.16 Section 550.16 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects...

  18. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project development. 660.112 Section 660.112 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by...

  19. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project development. 660.112 Section 660.112 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by...

  20. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project development. 660.112 Section 660.112 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by...

  1. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Project development. 550.16 Section 550.16 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects...

  2. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Project development. 550.16 Section 550.16 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects...

  3. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project development. 660.112 Section 660.112 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by...

  4. Quality Assurance Project Plan Development Tool

    EPA Pesticide Factsheets

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  5. Landfill Gas Energy Project Development Handbook

    EPA Pesticide Factsheets

    View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.

  6. Landfill Gas Energy Project Development Handbook Files

    EPA Pesticide Factsheets

    View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.

  7. Palestine. Priority Projects for Educational Development.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    This document presents the details of 10 projects concerning the education and training of the Palestinian people that were approved for funding by the Executive Board of UNESCO in October 1990. The objectives, justification, beneficiaries, and costs of each project are listed. The projects involve the following concerns: (1) Development of…

  8. Michigan's Comprehensive Vocational Education Personnel Development Project.

    ERIC Educational Resources Information Center

    Ferns, George W.; Callahan, Gwen

    The report describes a project aimed at meeting inservice personnel development needs of secondary and postsecondary vocational educators in Michigan. Following an overview which details the development of the project, personnel categories, major events, and a seven-step process model, the report is arranged into 6 parts. The first component of…

  9. VTAE Economic Development Project. Final Report.

    ERIC Educational Resources Information Center

    Klitzke, Elizabeth

    A project was undertaken to redefine the role of vocational, technical, and adult education (VTAE) in economic development in Wisconsin. Included among the objectives of the project were the following: to produce a statewide plan for economic development identifying new linkages among business, industry, labor, and the VTAE system; to develop…

  10. Project Development Specification for Valve Pit Manifold

    SciTech Connect

    MCGREW, D.L.

    2000-09-28

    Establishes the performance, design development, and test requirements for the valve pit manifolds. The system engineering approach was used to develop this document in accordance with the guidelines laid out in the Systems Engineering Management Plan for Project W-314.

  11. Time frames for geothermal project development

    SciTech Connect

    McClain, David W.

    2001-04-17

    Geothermal development can generally be broken down into distinct phases: Exploration and Leasing; Project Development And Feasibility Studies; Well Field Development; Project Finance, Construction and Start-up Operations; and Commercial Operations. Each phase represents different levels of cost and risk and different types of management teams that are needed to assess and manage the project and associated risk. Orderly transitions of management at each major phase are needed. Exploration programs are largely science based, the primary focus of the science based investigations should be to: secure the lease position, and develop sufficient information to identify and characterize an economical geothermal resource. Project development specialists build on the exploration data to: pull together a project design, develop a detailed cost estimate; prepare an environmental assessment; and collect all data needed for project financing. Construction specialist build from the development phase to: develop detailed engineering, procure equipment and materials, schedule and manage the facilities construction programs, and start and test the power plant. Operations specialists take over from construction during start-up and are responsible for sustainable and reliable operations of the resource and power generation equipment over the life of the project.

  12. Development Perspectives: A Curriculum Project

    ERIC Educational Resources Information Center

    Myles, Wayne

    1978-01-01

    Examines the curriculum kit "Resource Development--Brazil and Canada." It facilitates a rounded study of the theme of resource development and is designed to enable teachers and students to update, add, or delete sections. A brief account of its objectives, materials, and underlying curriculum principles is given. (Author/JK)

  13. Principal Development: Self-Directed Project Efficacy

    ERIC Educational Resources Information Center

    Piggot-Irvine, Eileen

    2011-01-01

    The inclusion of self-directed projects as an element within a New Zealand principal development programme was designed to reflect increasing support internationally for such a context-specific "inquiry" approach. The results reported in this article suggest that considerable clarity is required for such projects if they are to realize…

  14. Principal Development: Self-Directed Project Efficacy

    ERIC Educational Resources Information Center

    Piggot-Irvine, Eileen

    2011-01-01

    The inclusion of self-directed projects as an element within a New Zealand principal development programme was designed to reflect increasing support internationally for such a context-specific "inquiry" approach. The results reported in this article suggest that considerable clarity is required for such projects if they are to realize…

  15. Launching an ESOL Materials Development Project.

    ERIC Educational Resources Information Center

    Dubin, Fraida

    Guidelines for teachers of English to speakers of other languages (ESOL) who wish to undertake an ESOL materials development project are presented. Three areas that affect all such projects are discussed: (1) writing for a local or a wider audience, (2) writing as a team effort, and (3) writing as a decision-making process. In creating for a local…

  16. EUDISED Project: Present State and Development Prospects.

    ERIC Educational Resources Information Center

    Council for Cultural Cooperation, Strasbourg (France).

    A summary of the European Documentation and Information System for Education (EUDISED) March 1977 meeting describes the present state of the project and discussion of suggestions for future development. The preparatory phase of the project will be concluded in 1977 and ready for implementation; however, the present financial situation makes it…

  17. Chicago Public Schools Professional Development Project.

    ERIC Educational Resources Information Center

    Chicago Public Education Fund, IL.

    This report describes findings from the Chicago Public Schools (CPS) Professional Development Project, which was developed to inventory the alignment of dollars and professional development offerings to a set of professional development principles and district priorities; compare findings with other districts and best practices; articulate and…

  18. Photovoltaic concentrator technology development project. Sixth project integration meeting

    SciTech Connect

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  19. The Financing of Media Projects for Development.

    ERIC Educational Resources Information Center

    Spain, Peter L.

    1978-01-01

    Discusses the financing of Third World media projects that are designed for development, and reports on five main sources of funding--government sources, international agencies, advertising sales, private local support, and self-support. (Author/JEG)

  20. Leadership Development Program Final Project

    NASA Technical Reports Server (NTRS)

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  1. Yield model development project implementation plan

    NASA Technical Reports Server (NTRS)

    Ambroziak, R. A.

    1982-01-01

    Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.

  2. Session: Wind industry project development

    SciTech Connect

    Gray, Tom; Enfield, Sam

    2004-09-01

    This first session at the Wind Energy and Birds/Bats workshop consisted of two presentations followed by a question and answer period. The session was intended to provide a general overview of wind energy product development, from the industry's perspective. Tom Gray of AWEA presented a paper titled ''State of the Wind Energy Industry in 2004'', highlighting improved performance and lower cost, efforts to address avian impacts, a status of wind energy in comparison to other energy-producing sources, and ending on expectations for the near future. Sam Enfield of Atlantic Renewable Energy Corporation presented a paper titled ''Key Factors for Consideration in Wind Plant Siting'', highlighting factors that wind facility developers must consider when choosing a site to build wind turbines and associated structures. Factors covered include wind resources available, ownership and land use patterns, access to transmission lines, accessibility and environmental impacts. The question and answer sum mary included topics related to risk taking, research and development, regulatory requirements, and dealing with utilities.

  3. Child Development Project: Description of Program.

    ERIC Educational Resources Information Center

    Developmental Studies Center, San Ramon, CA.

    The Child Development Project (CDP) was designed to enhance the development of prosocial characteristics in school children in kindergarten through sixth grade. It was developed and evaluated in a school district (San Ramon) in the San Francisco, California area. The features of the program include: (1) an instructional approach that enhances…

  4. Child Development Project: Description of Program.

    ERIC Educational Resources Information Center

    Developmental Studies Center, San Ramon, CA.

    The Child Development Project (CDP) was designed to enhance the development of prosocial characteristics in school children in kindergarten through sixth grade. It was developed and evaluated in a school district (San Ramon) in the San Francisco, California area. The features of the program include: (1) an instructional approach that enhances…

  5. Developments in projection lenses for HDTV

    NASA Astrophysics Data System (ADS)

    Rudolph, John D.

    1991-08-01

    Recent focus on the development of HDTV systems worldwide has raised a critical concern--the economic viability of HDTV for the home marketplace. While projection systems performing at or above HDTV-quality levels exist today, they are designed for the institutional market and are priced far above the threshold for the individual consumer. Manufacturers will be under considerable pressure to significantly reduce the cost of HDTV projectors, as will the suppliers of key components such as lenses. Fortunately, recent developments have been made in the design, development and manufacturing technologies used to produce hybrid lenses for high-performance projection systems. This is particularly true for CRT-based front- and rear-projection systems for data and graphics applications. Extending these advances to HDTV would suggest that by the time HDTV is ready for high volume mass production, cost-effective projection lenses will be enhancing, not retarding, the market acceptance of HDTV.

  6. Advanced Gas Turbine Powertrain System Development Project

    NASA Technical Reports Server (NTRS)

    Helms, H. E.

    1980-01-01

    A progress report on the Advanced Gas Turbine Powertrain System Development Project being performed under contract from NASA Lewis is presented. The goals and objectives of the project are described noting that funds from the DOE, Office of Transportation Programs are used to sponsor the project. Among the demonstration objectives are attaining a fuel economy of 42.5 miles per gallon in a 1985 Pontiac Phoenix, multifuel capability, and emission levels within the federal standards. Design objectives examined include competitive reliability and life as well as competitive initial and life cycle costs. Finally, it is stressed that high risk and key elements in this advanced powertrain project are the development of ceramic turbine engine components and the aerodynamic development of small size turbine components.

  7. Solar concentrator advanced development project

    NASA Technical Reports Server (NTRS)

    Corrigan, Robert D.; Ehresman, Derik T.

    1987-01-01

    A solar dynamic concentrator design developed for use with a solar-thermodynamic power generation module intended for the Space Station is considered. The truss hexagonal panel reflector uses a modular design approach and is flexible in attainable flux profiles and assembly techniques. Preliminary structural, thermal, and optical analysis results are discussed. Accuracy of the surface reflectors should be within 5 mrad rms slope error, resulting in the need for close fabrication tolerances. Significant fabrication issues to be addressed include the facet reflective and protective coating processes and the surface specularity requirements.

  8. Project development in a new era

    SciTech Connect

    Vold, J.N.

    1995-12-31

    This paper reviews the business making processes being used in the Norwegian oil industry to help optimize the development of their offshore oil resources. It reviews their resource development strategies in a competitive market to reduce overall development costs. It also discusses the current status of offshore oil in Norway, the market for this oil, and sources of competition for the oil market. Finally the paper describes operation and development projects in the offshore areas to demonstrate the optimal methods for development.

  9. Smart-1 Project Development Status

    NASA Astrophysics Data System (ADS)

    Racca, G. D.; Foing, B. H.; SMART-1 Project Team

    SMART-1 is the first of the Small Missions for Advanced Research in Technology of the ESA Horizons 2000 Science Plan. The main mission objective of SMART-1 is to demonstrate key technologies for Bepi-Colombo and other scientific deep-space missions. One of the key technologies is the solar electric propulsion used as primary propulsion. The electric propulsion will be using 1400W to transfer the 350 kg space- craft from an Ariane-5 standard GTO to an elliptic Moon polar orbit, 10000x300 km. The total mission time is 24 months including a maximum of 18 months transfer time. The spacecraft development entered the detailed design and implementation phase in October 1999, under the responsibility of the Swedish Space Corporation as prime contractor, and the flight acceptance is targeted for the end of 2002. Apart from the in-orbit demonstration of electric propulsion as primary propulsion, SMART-1 is im- plementing many other enabling technologies for deep-space missions. In addition, the spacecraft avionics design is tailored to the low cost philosophy by enabling flexi- ble integration of Commercial Off The Shelf (COTS) equipment. The scientific instru- ments support the characterisation of the electric propulsion thrust environment during the long transfer phase and detailed imaging and spectroscopy of the lunar surface in visible, infrared and X-ray during the Moon orbiting phase. The paper summarises the baseline mission and spacecraft design. The main part of the paper highlights the spacecraft design status and the assembly, integration and verification activities.

  10. Optimising Impact in Astronomy for Development Projects

    NASA Astrophysics Data System (ADS)

    Grant, Eli

    2015-08-01

    Positive outcomes in the fields of science education and international development are notoriously difficult to achieve. Among the challenges facing projects that use astronomy to improve education and socio-economic development is how to optimise project design in order to achieve the greatest possible benefits. Over the past century, medical scientists along with statisticians and economists have progressed an increasingly sophisticated and scientific approach to designing, testing and improving social intervention and public health education strategies. This talk offers a brief review of the history and current state of `intervention science'. A similar framework is then proposed for astronomy outreach and education projects, with applied examples given of how existing evidence can be used to inform project design, predict and estimate cost-effectiveness, minimise the risk of unintended negative consequences and increase the likelihood of target outcomes being achieved.

  11. Space market model development project, phase 3

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Hamel, Gary P.

    1989-01-01

    The results of a research project investigating information needs for space commercialization is described. The Space Market Model Development Project (SMMDP) was designed to help NASA identify the information needs of the business community and to explore means to meet those needs. The activity of the SMMDP is reviewed and a report of its operation via three sections is presented. The first part contains a brief historical review of the project since inception. The next part reports results of Phase 3, the most recent stage of activity. Finally, overall conclusions and observations based on the SMMDP research results are presented.

  12. An Atmospheric Instrument Development Outreach Project

    NASA Astrophysics Data System (ADS)

    Guerra, David; Cordella, Nick; Bracy, Sue

    2002-04-01

    In an effort to cultivate the interest in atmospheric science of middle school students, we have established a long-term outreach program in which students become active participants in an instrument development study. This project was motivated by the low cost, $20.00, hand-held haze detector (HHHD) developed by Forrest Mims III and the capabilities of the instruments located 5 miles away as part of the Saint Anselm Atmospheric Sensing Experiment (SAASE). The focus of the project, for the past two academic years, has been the development and data collected with two different HHHDs, operated by eighth graders from Mountain View Middle School (MVMS). This data is then compared to the solar irradiance measurements made with SAASE's automated multifilter shadow band radiometer (MFSBR). This type of outreach project not only teaches students about the atmosphere but also the process of instrument development and the creative aspects of science.

  13. Development of Direct-Use Projects: Preprint

    SciTech Connect

    Lund, J.

    2011-01-01

    A geothermal direct-use project utilizes a natural resource, a flow of geothermal fluid at elevated temperatures, which is capable of providing heat and/or cooling to buildings, greenhouses, aquaculture ponds, and industrial processes. Geothermal utilization requires matching the varied needs of the user and characteristics of the resource in order to development a successful project. Each application is unique; guidelines are provided for the logical steps required to implement a project. Recommended temperature and flows are suggested for spas and pools, space and district heating, greenhouse and aquaculture pond heating, and industrial applications. Guidelines are provided for selecting the necessary equipment for successfully implementing a direct-use project, including downhole pumps, piping, heat exchangers, and heat convectors. Additionally, the relationship between temperature, flow rate, and the use of heat exchangers to provide heat to a space with hot water or hot air is provided for a number of applications, with suggested 'rules of thumb'.

  14. Developing Innovation Through Graduate Team Design Projects

    ERIC Educational Resources Information Center

    Rodenberger, Charles A.

    1972-01-01

    Important points are that invention and innovation are important elements of technological change, that creative engineering and innovation can be encouraged, and that understanding of the innovation process can be taught on an interdisciplinary base. Course involves developing a project to solve one of the important problems in the world today.…

  15. Implementing Information Technology Projects in Developing Countries.

    ERIC Educational Resources Information Center

    Kanamugire, Athanase B.

    1993-01-01

    Reviews the problems of implementing information technology in developing countries and cites examples from African projects. The use of CD-ROM for access to information is examined, and experiences at the King Fahd University of Petroleum and Minerals in Saudi Arabia in introducing CD-ROM search services are described. (Contains five references.)…

  16. Renewable Energy Project Development Assistance (Fact Sheet)

    SciTech Connect

    2013-07-01

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  17. Double beta decay: recent developments and projections

    SciTech Connect

    Avignone, F.T. III; Brodzinski, R.L.; Brown, D.P.; Evans, J.C. Jr.; Hensley, W.K.; Reeves, J.H.; Wogman, N.A.

    1983-08-01

    A report of recent events in both theoretical and experimental aspects of double beta decay is given. General theoretical considerations, recent developments in nuclear structure theory, geochronological determinations of half lives and ratios as well as laboratory experiments are discussed with emphasis on the past three years. Some projections are given. 28 references.

  18. Renewable Energy Project Development Assistance (Fact Sheet)

    SciTech Connect

    Not Available

    2013-07-01

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  19. Pyramid Project: An Exemplary Staff Development Plan.

    ERIC Educational Resources Information Center

    Ardmore City Schools, OK.

    The Ardmore, Oklahoma, School District developed the 3-year Pyramid Project to implement the following recommendations of the Sid W. Richardson Foundation Study of exemplary programs for high ability students: (1) broaden the process for assessing student abilities, (2) adopt continuous progress and appropriate pacing, (3) cultivate students'…

  20. Project DISC: Developing Indian Software Curriculum.

    ERIC Educational Resources Information Center

    Jacobi, Carolyn

    Project DISC (Developing Indian Software Curriculum) was initiated in the Rapid City (South Dakota) school district to improve Native American children's reading and language arts ability and to provide them with microcomputer skills. During the summer of 1982, introductory computer activities were planned, a computer specialist was hired, and…

  1. Electronics Technology Curriculum Development Project (ETCDP): Report.

    ERIC Educational Resources Information Center

    Illinois Univ., Urbana.

    The report describes in detail the Electronics Technology Curriculum Development Project, a two-year electronics technology program with six core courses (three in circuit analysis and three in fundamentals of electronics) and an introduction to electronics technology course. Two chapters present the operation, scope, and objectives of the project…

  2. Workforce development and effective evaluation of projects.

    PubMed

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  3. Development of Capstone Project Attitude Scales

    ERIC Educational Resources Information Center

    Bringula, Rex P.

    2015-01-01

    This study attempted to develop valid and reliable Capstone Project Attitude Scales (CPAS). Among the scales reviewed, the Modified Fennema-Shermann Mathematics Attitude Scales was adapted in the construction of the CPAS. Usefulness, Confidence, and Gender View were the three subscales of the CPAS. Four hundred sixty-three students answered the…

  4. Project DIVIDE Instrument Development. Technical Report # 0810

    ERIC Educational Resources Information Center

    Ketterlin-Geller, Leanne; Jung, Eunju; Geller, Josh; Yovanoff, Paul

    2008-01-01

    In this technical report, we describe the development of cognitive diagnostic test items that form the basis of the diagnostic system for Project DIVIDE (Dynamic Instruction Via Individually Designed Environments). The construct underlying the diagnostic test is division of fractions. We include a description of the process we used to identify the…

  5. Robotic Lunar Lander Development Project Status

    NASA Technical Reports Server (NTRS)

    Hammond, Monica; Bassler, Julie; Morse, Brian

    2010-01-01

    This slide presentation reviews the status of the development of a robotic lunar lander. The goal of the project is to perform engineering tests and risk reduction activities to support the development of a small lunar lander for lunar surface science. This includes: (1) risk reduction for the flight of the robotic lander, (i.e., testing and analyzing various phase of the project); (2) the incremental development for the design of the robotic lander, which is to demonstrate autonomous, controlled descent and landing on airless bodies, and design of thruster configuration for 1/6th of the gravity of earth; (3) cold gas test article in flight demonstration testing; (4) warm gas testing of the robotic lander design; (5) develop and test landing algorithms; (6) validate the algorithms through analysis and test; and (7) tests of the flight propulsion system.

  6. Developing population estimates for dose reconstruction projects

    SciTech Connect

    Beck, D.M. )

    1991-01-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project was established in 1987 to estimate radiation doses that people received from nuclear operations at the Hanford site since 1944. To achieve this objective, demographic information was developed that describes the study population in enough detail to allow researchers to identify potentially exposed groups and the number of people in each of those groups. This type of information is central to most dose reconstruction projects. The purpose of this paper is to detail how historical population estimates can be reconstructed in a reliable manner by comparing results using three different estimation methods.

  7. Neighborhood Energy/Economic Development project

    SciTech Connect

    Not Available

    1991-12-31

    Energy costs impact low income communities more than anyone else. Low income residents pay a larger percentage of their incomes for energy costs. In addition, they generally have far less discretionary energy use to eliminate in response to increasing energy prices. Furthermore, with less discretionary income, home energy efficiency improvements are often too expensive. Small neighborhood businesses are in the same situation. Improved efficiency in the use of energy can improve this situation by reducing energy costs for residents and local businesses. More importantly, energy management programs can increase the demand for local goods and services and lead to the creation of new job training and employment opportunities. In this way, neighborhood based energy efficiency programs can support community economic development. The present project, undertaken with the support of the Urban Consortium Energy Task Force, was intended to serve as a demonstration of energy/economic programming at the neighborhood level. The San Francisco Neighborhood Energy/Economic Development (NEED) project was designed to be a visible demonstration of bringing the economic development benefits of energy management home to low-income community members who need it most. To begin, a Community Advisory Committee was established to guide the design of the programs to best meet needs of the community. Subsequently three neighborhood energy/economic development programs were developed: The small business energy assistance program; The youth training and weatherization program; and, The energy review of proposed housing development projects.

  8. Testing Software Development Project Productivity Model

    NASA Astrophysics Data System (ADS)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  9. Promoting Positive Youth Development: The Miami Youth Development Project (YDP)

    ERIC Educational Resources Information Center

    Kurtines, William M.; Ferrer-Wreder, Laura; Berman, Steven L.; Lorente, Carolyn Cass; Briones, Ervin; Montgomery, Marilyn J.; Albrecht, Richard; Garcia, Arlen J.; Arrufat, Ondina

    2008-01-01

    The Miami Youth Development Project (YDP) had its beginnings in the early 1990s as a grassroots response to the needs of troubled (multiproblem) young people in the community (Arnett, Kurtines, & Montgomery, 2008, this issue). YDP is an important outcome of efforts to create positive youth development interventions that draw on the strengths…

  10. Promoting Positive Youth Development: The Miami Youth Development Project (YDP)

    ERIC Educational Resources Information Center

    Kurtines, William M.; Ferrer-Wreder, Laura; Berman, Steven L.; Lorente, Carolyn Cass; Briones, Ervin; Montgomery, Marilyn J.; Albrecht, Richard; Garcia, Arlen J.; Arrufat, Ondina

    2008-01-01

    The Miami Youth Development Project (YDP) had its beginnings in the early 1990s as a grassroots response to the needs of troubled (multiproblem) young people in the community (Arnett, Kurtines, & Montgomery, 2008, this issue). YDP is an important outcome of efforts to create positive youth development interventions that draw on the strengths…

  11. Advanced Refrigerator/Freezer Technology Development Project

    NASA Technical Reports Server (NTRS)

    Cairelli, James E.; Geng, Steven M.

    1999-01-01

    The Advanced Refrigerator/Freezer (R/F) Technology Development Project was initiated in 1994, on the basis of recommendations of a team of NASA Scientists and engineers, who assessed the need for advanced technology to support future life and biomedical sciences space flight missions. The project, which was cofunded by NASA's Office of Aerospace Technology and Life and Biomedical Sciences & Applications Division, has two phases. In the Phase I Advanced R/F Technology Assessment, candidate technologies were identified and ranked, on the basis of a combination of their effect on system performance and their risk of developmental success. In Phase II Technology Development, the advanced technologies with the highest combined ranking, which could be accomplished within the budgetary constraints, were pursued. The effort has been mainly by contract, with a modest in-house effort at the NASA Lewis Research Center. Oceaneering Space Systems (OSS) of Houston, Texas, was selected as the prime contractor for both contract phases.

  12. Mod 2 Wind Turbine Development Project

    SciTech Connect

    1980-10-01

    The primary objective in the development of Mod 2 was to design a wind turbine to produce energy for less than 5 cents/kWh based on 1980 cost forecasts. The pricing method used to project the Mod 2 energy costs is the levelized fixed charge rate approach, generally accepted in the electric utility industry as a basis for relative ranking of energy alternatives. This method derives a levelized energy price necessary to recover utility's purchasing, installing, owning, operating, and maintenance costs.

  13. The NEED (National Energy Education Development) Project

    NASA Astrophysics Data System (ADS)

    Hogan, D.; Spruill, M.

    2012-04-01

    The NEED (National Energy Education Development) Project is a non-profit organization which provides a wide range of K-12 curriculum on energy education topics. The curriculum is specific for primary, elementary, intermediate and secondary levels with age appropriate activities and reading levels. The NEED Project covers a wide range of topics from wind energy, nuclear energy, solar energy, hydropower, hydrogen, fossil fuels, energy conservation, energy efficiency and much more. One of the major strengths of this organization is its Teacher Advisory Board. The curriculum is routinely revised and updated by master classroom teachers who use the lessons and serve on the advisory board. This ensures it is of the highest quality and a useful resource. The NEED Project through a variety of sponsors including businesses, utility companies and government agencies conducts hundreds of teacher professional development workshops each year throughout the United States and have even done some workshops internationally. These workshops are run by trained NEED facilitators. At the workshops, teachers gain background understanding of the energy topics and have time to complete the hands on activities which make up the curriculum. The teachers are then sent a kit of equipment after successfully completing the workshop. This allows them to teach the curriculum and have their students perform the hands on labs and activities in the classroom. The NEED Project is the largest provider of energy education related curriculum in the United States. Their efforts are educating teachers about energy topics and in turn educating students in the hope of developing citizens who are energy literate. Many of the hands on activities used to teach about various energy sources will be described and demonstrated.

  14. Global Software Development Patterns for Project Management

    NASA Astrophysics Data System (ADS)

    Välimäki, Antti; Kääriäinen, Jukka; Koskimies, Kai

    Global software development with the agile or waterfall development process has been taken into use in many companies. GSD offers benefits but also new challenges without known, documented solutions. The goal of this research is to present current best practices for GSD in the form of process patterns for project management, evaluated by using a scenario-based assessment method. The best practices have been collected from a large company operating in process automation. It is expected that the resulting pattern language helps other companies to improve their GSD processes by incorporating the patterns in the processes.

  15. Projected Geothermal Energy Development in Canada

    SciTech Connect

    Souther, Jack G.

    1980-12-01

    A systematic evaluation of geothermal energy resources in Canada was begun in 1973 with the compilation of an inventory of thermal springs and young igneous centres (11) and a study of the thermal regime of the Central Canada Plains (15). The status of this work is still very preliminary. The nature, distribution and grade of the geothermal resource-base can be estimated within reasonable limits but the impact of future economic and political constraints, and the rate of development of new conversion technologies are more difficult to forecast. Thus, projections of geothermal energy development in Canada are necessarily less precise than estimate of the resource-base.

  16. The advanced software development workstation project

    NASA Technical Reports Server (NTRS)

    Fridge, Ernest M., III; Pitman, Charles L.

    1991-01-01

    The Advanced Software Development Workstation (ASDW) task is researching and developing the technologies required to support Computer Aided Software Engineering (CASE) with the emphasis on those advanced methods, tools, and processes that will be of benefit to support all NASA programs. Immediate goals are to provide research and prototype tools that will increase productivity, in the near term, in projects such as the Software Support Environment (SSE), the Space Station Control Center (SSCC), and the Flight Analysis and Design System (FADS) which will be used to support the Space Shuttle and Space Station Freedom. Goals also include providing technology for development, evolution, maintenance, and operations. The technologies under research and development in the ASDW project are targeted to provide productivity enhancements during the software life cycle phase of enterprise and information system modeling, requirements generation and analysis, system design and coding, and system use and maintenance. On-line user's guides will assist users in operating the developed information system with knowledge base expert assistance.

  17. NASA Redox Storage System Development Project

    NASA Astrophysics Data System (ADS)

    Hagedorn, N. H.

    1984-10-01

    The Redox Storage System Technology Project was jointly supported by the U.S. Department of Energy and NASA. The objectives of the project were to develop the Redox flow battery concept and to probe its technical and economic viability. The iron and chromium redox couples were selected as the reactants. Membranes and electrodes were developed for the original mode of operating at 25 C with the reactants separated by an ion-exchange membrane. Analytical capabilities and system-level operating concepts were developed and verified in a 1-kW, 13-kWh preprototype system. A subsequent change was made in operating mode, going to 65 C and using mixed reactants. New membranes and a new electrode catalyst were developed, resulting in single cell operation as high as 80 mA/sq cm with energy efficiencies greater than 80 percent. Studies indicate a likely system cost of about $75/kWh. Standard Oil of Ohio (Sohio) has undertaken further development of the Redox system. An exclusive patent license was obtained from NASA by Sohio. Transfer of Redox technology to Sohio is supported by the NASA Technology Utilization Office.

  18. NASA Redox Storage System Development Project

    NASA Technical Reports Server (NTRS)

    Hagedorn, N. H.

    1984-01-01

    The Redox Storage System Technology Project was jointly supported by the U.S. Department of Energy and NASA. The objectives of the project were to develop the Redox flow battery concept and to probe its technical and economic viability. The iron and chromium redox couples were selected as the reactants. Membranes and electrodes were developed for the original mode of operating at 25 C with the reactants separated by an ion-exchange membrane. Analytical capabilities and system-level operating concepts were developed and verified in a 1-kW, 13-kWh preprototype system. A subsequent change was made in operating mode, going to 65 C and using mixed reactants. New membranes and a new electrode catalyst were developed, resulting in single cell operation as high as 80 mA/sq cm with energy efficiencies greater than 80 percent. Studies indicate a likely system cost of about $75/kWh. Standard Oil of Ohio (Sohio) has undertaken further development of the Redox system. An exclusive patent license was obtained from NASA by Sohio. Transfer of Redox technology to Sohio is supported by the NASA Technology Utilization Office.

  19. Developing financeable projects in Central Europe

    SciTech Connect

    Chelberg, R.; Prerad, V.

    1995-12-01

    POWER`s engineering and development experience in the Czech Republic creating financeable projects within the power generation industry will be presented. POWER has been involved in the Czech Republic`s privatization process, environmental legislation as well as formation of the regulatory environment. Strategic methods for accomplishing the development of financeable projects often include ownership and financial restructuring of the projects. This is done by utilizing internal cash flows, external debt and equity placement (provided by international financial institutions) by restructuring the facility`s contractual relationships and operations (providing as least cost solution to engineering) and possibly using existing governmental guarantees. In order to make any recommendations on how to come into compliance with the country`s environmental legislation, it is necessary to begin with an analysis of the existing facility. This involves preparation of technical and economic feasibility study, evaluation of technology and preliminary engineering solutions. It further involves restructuring of power sales agreements, heat sales agreements, and fuel supply agreements. The goal is to provide suitable security for the equity and debt financing participants by mitigating risk and creating a single purpose business unit with predictable life and economics.

  20. The TPS Advanced Development Project for CEV

    NASA Technical Reports Server (NTRS)

    Reuther, James; Wercinski, Paul; Venkatapathy, Ethiraj; Ellerby, Don; Raiche, George; Bowman, Lynn; Jones, Craig; Kowal, John

    2006-01-01

    The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design

  1. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  2. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Project eligibility: Airport development....107 Project eligibility: Airport development. (a) Except in the case of approved stage development, each project for airport development must provide for— (1) Development of an airport or unit of an...

  3. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Project eligibility: Airport development....107 Project eligibility: Airport development. (a) Except in the case of approved stage development, each project for airport development must provide for— (1) Development of an airport or unit of an...

  4. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Project eligibility: Airport development....107 Project eligibility: Airport development. (a) Except in the case of approved stage development, each project for airport development must provide for— (1) Development of an airport or unit of an...

  5. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Project eligibility: Airport development....107 Project eligibility: Airport development. (a) Except in the case of approved stage development, each project for airport development must provide for— (1) Development of an airport or unit of an...

  6. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport development....107 Project eligibility: Airport development. (a) Except in the case of approved stage development, each project for airport development must provide for— (1) Development of an airport or unit of an...

  7. Advanced EVA Suit Camera System Development Project

    NASA Technical Reports Server (NTRS)

    Mock, Kyla

    2016-01-01

    The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was

  8. Advanced Gas Turbine (AGT) technology development project

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This report is the final in a series of Technical Summary Reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorizrd under NASA Contract DEN3-167 and sponsored by the DOE. The project was administered by NASA-Lewis Research Center of Cleveland, Ohio. Plans and progress are summarized for the period October 1979 through June 1987. This program aims to provide the US automotive industry the high risk, long range technology necessary to produce gas turbine engines for automobiles that will reduce fuel consumption and reduce environmental impact. The intent is that this technology will reach the marketplace by the 1990s. The Garrett/Ford automotive AGT was designated AGT101. The AGT101 is a 74.5 kW (100 shp) engine, capable of speeds to 100,000 rpm, and operates at turbine inlet temperatures to 1370 C (2500 F) with a specific fuel consumption level of 0.18 kg/kW-hr (0.3 lbs/hp-hr) over most of the operating range. This final report summarizes the powertrain design, power section development and component/ceramic technology development.

  9. BASALT Project Helps Develop Mars Science Protocols

    NASA Image and Video Library

    2016-11-18

    Researchers from NASA Ames and the University of Hawaii - Hilo spent 18 days simulating science activities on the surface of Mars. Although no spacesuits were used, scientist hiked around Hawaii Volcanoes National Park on the Island of Hawaii and collected rock samples like they would on the Red Planet. One goal of the Biologic Analog Science Associated with Lava Terrains project is to develop rules and protocols that could be used on an actual Mars mission to identify and protect geologic samples that could contain life. Communications with a mission control room were delayed, to simulate actual transmission times between Earth and Mars.

  10. Session: Pre-development project risk assessment

    SciTech Connect

    Curry, Richard; Linehan, Andy

    2004-09-01

    This second session at the Wind Energy and Birds/Bats workshop consisted of two presentations followed by a discussion/question and answer period. The focus of the presentations was on the practices and methodologies used in the wind energy industry for assessing risk to birds and bats at candidate project sites. Presenters offered examples of pre-development siting evaluation requirements set by certain states. Presentation one was titled ''Practices and Methodologies and Initial Screening Tools'' by Richard Curry of Curry and Kerlinger, LLC. Presentation two was titled ''State of the Industry in the Pacific Northwest'' by Andy Linehan, CH2MHILL.

  11. Smart Grid Development: Multinational Demo Project Analysis

    NASA Astrophysics Data System (ADS)

    Oleinikova, I.; Mutule, A.; Obushevs, A.; Antoskovs, N.

    2016-12-01

    This paper analyses demand side management (DSM) projects and stakeholders' experience with the aim to develop, promote and adapt smart grid tehnologies in Latvia. The research aims at identifying possible system service posibilites, including demand response (DR) and determining the appropriate market design for such type of services to be implemented at the Baltic power system level, with the cooperation of distribution system operator (DSO) and transmission system operator (TSO). This paper is prepared as an extract from the global smart grid best practices, smart solutions and business models.

  12. Advanced Gas Turbine (AGT) Technology Development Project, ceramic component developments

    NASA Technical Reports Server (NTRS)

    Teneyck, M. O.; Macbeth, J. W.; Sweeting, T. B.

    1987-01-01

    The ceramic component technology development activity conducted by Standard Oil Engineered Materials Company while performing as a principal subcontractor to the Garrett Auxiliary Power Division for the Advanced Gas Turbine (AGT) Technology Development Project (NASA Contract DEN3-167) is summarized. The report covers the period October 1979 through July 1987, and includes information concerning ceramic technology work categorized as common and unique. The former pertains to ceramic development applicable to two parallel AGT projects established by NASA contracts DEN3-168 (AGT100) and DEN3-167 (AGT101), whereas the unique work solely pertains to Garrett directed activity under the latter contract. The AGT101 Technology Development Project is sponsored by DOE and administered by NASA-Lewis. Standard Oil directed its efforts toward the development of ceramic materials in the silicon-carbide family. Various shape forming and fabrication methods, and nondestructive evaluation techniques were explored to produce the static structural components for the ceramic engine. This permitted engine testing to proceed without program slippage.

  13. Analisys, processing and validation data from eolic stations of SONDA project (National Organization System of Environmental Data) at Brazilian National Institute for Space Research (CPTEC/INPE) .

    NASA Astrophysics Data System (ADS)

    Junior, A. B.; Nogueira, J. M.; Garcia, S. G.; Andrade, E. S.

    2007-05-01

    Asiel Bomfin Jr. LIM/CPTEC/INPE, Cachoeira Paulista, S.P., Brazil; Eliana Soares de Andrade; Jorge Luiz Martins Nogueira and Silvia Garcia de Castro. The Center for Weather Forecast and Climatic Analysis (CPTEC), a division of INPE, the Brazilian National Institute for Space Research. Several of the INPE´s departments and centers, like the CPTEC, have a variety of valuable datasets, many of them freely available and eolic data from SONDA project are also part of them at Meteorological Instrumental Laboratory (LIM). This paper presents the Analiys, processing and validation method applied to the eolic data in a temporal time of ten minutes, to be used in a PC IBM computer. This method is divided in tree separated programs. The first software called "separa.c" has the capability of divide the ingest data set in mensal files, identified by each station group. The second software called "minuto.c" does a syntactical analysis, verifying and correcting eventual lost data with NAN values. The third one called "validacode.c" generates two principal files, one containing the original data and the other with the codes of each variable for each minute analyzed. These codes is based on BSRN (Baseline Surface Radiation Network), but with some differences in their analyzed method. This method followed the Webmet.com, The Meteorological Resource Center. Table 1:Validation Codes Code Meaning 0 Quality check procedure is not avaiable for this level 2 The data is suspect 5 Quality check procedure is avaiable for this level, but not can be done 9 The data is correct Table 2: Validation levels for WIND SPEED: Validation Levels Quality check procedure for suspect data 0 Maximum and Minimum values of 25 m/s and 0 m/s 1 Can not vary more than 0,1 m/s for 03 consecutive hours 2 Can not vary more than 0,5 m/s for 12 consecutive hours 3 - Table 3: Validation levels for WIND DRECTION: Validation Levels Quality check procedure for suspect data 0 Maximum and Minimum values of 360 and 0

  14. Cyrogenic Life Support Technology Development Project

    NASA Technical Reports Server (NTRS)

    Bush, David R.

    2015-01-01

    KSC has used cryogenic life support (liquid air based) technology successfully for many years to support spaceflight operations. This technology has many benefits unique to cryogenics when compared to traditional compressed gas systems: passive cooling, lighter, longer duration, and lower operating pressure. However, there are also several limiting factors that have prevented the technology from being commercialized. The National Institute of Occupational Safety and Health, Office of Mine Safety and Health Research (NIOSH-OMSHR) has partnered with NASA to develop a complete liquid air based life support solution for emergency mine escape and rescue. The project will develop and demonstrate various prototype devices and incorporate new technological innovations that have to date prevented commercialization.

  15. The Advanced Software Development and Commercialization Project

    SciTech Connect

    Gallopoulos, E. . Center for Supercomputing Research and Development); Canfield, T.R.; Minkoff, M.; Mueller, C.; Plaskacz, E.; Weber, D.P.; Anderson, D.M.; Therios, I.U. ); Aslam, S.; Bramley, R.; Chen, H.-C.; Cybenko, G.; Gallopoulos, E.; Gao, H.; Malony, A.; Sameh, A. . Center for Supercomputing Research

    1990-09-01

    This is the first of a series of reports pertaining to progress in the Advanced Software Development and Commercialization Project, a joint collaborative effort between the Center for Supercomputing Research and Development of the University of Illinois and the Computing and Telecommunications Division of Argonne National Laboratory. The purpose of this work is to apply techniques of parallel computing that were pioneered by University of Illinois researchers to mature computational fluid dynamics (CFD) and structural dynamics (SD) computer codes developed at Argonne. The collaboration in this project will bring this unique combination of expertise to bear, for the first time, on industrially important problems. By so doing, it will expose the strengths and weaknesses of existing techniques for parallelizing programs and will identify those problems that need to be solved in order to enable wide spread production use of parallel computers. Secondly, the increased efficiency of the CFD and SD codes themselves will enable the simulation of larger, more accurate engineering models that involve fluid and structural dynamics. In order to realize the above two goals, we are considering two production codes that have been developed at ANL and are widely used by both industry and Universities. These are COMMIX and WHAMS-3D. The first is a computational fluid dynamics code that is used for both nuclear reactor design and safety and as a design tool for the casting industry. The second is a three-dimensional structural dynamics code used in nuclear reactor safety as well as crashworthiness studies. These codes are currently available for both sequential and vector computers only. Our main goal is to port and optimize these two codes on shared memory multiprocessors. In so doing, we shall establish a process that can be followed in optimizing other sequential or vector engineering codes for parallel processors.

  16. Fast Charging Electric Vehicle Research & Development Project

    SciTech Connect

    Heny, Michael

    2014-03-31

    The research and development project supported the engineering, design and implementation of on-road Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: Short Commute: Defined as EVs performing in limited duration, routine commutes. - Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. - Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehicle-related greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment

  17. Management Guidelines for Database Developers' Teams in Software Development Projects

    NASA Astrophysics Data System (ADS)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  18. The Mod-2 wind turbine development project

    NASA Technical Reports Server (NTRS)

    Linscott, B. S.; Dennett, J. T.; Gordon, L. H.

    1981-01-01

    A major phase of the Federal Wind Energy Program, the Mod-2 wind turbine, a second-generation machine developed by the Boeing Engineering and Construction Co. for the U.S. Department of Energy and the Lewis Research Center of the National Aeronautics and Space Administration, is described. The Mod-2 is a large (2.5-MW power rating) horizontal-axis wind turbine designed for the generation of electrical power on utility networks. Three machines were built and are located in a cluster at Goodnoe Hills, Washington. All technical aspects of the project are described: design approach, significant innovation features, the mechanical system, the electrical power system, the control system, and the safety system.

  19. Great Plains Wind Energy Transmission Development Project

    SciTech Connect

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the

  20. Advanced Gas Turbine (AGT) Technology Development Project

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This report is the eleventh in the series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Standard Oil Company, and AiResearch Casting Company. This report covers plans and progress for the period July 1, 1985 through June 30, 1986. Technical progress during the reported period was highlighted by the 85-hour endurance run of an all-ceramic engine operating in the 2000 to 2250 F temperature regime. Component development continued in the areas of the combustion/fuel injection system, regenerator and seals system, and ceramic turbine rotor attachment design. Component rig testing saw further refinements. Ceramic materials showed continued improvements in required properties for gas turbine applications; however, continued development is needed before performance and reliability goals can be set.

  1. Recent developments in the BRAMS project

    NASA Astrophysics Data System (ADS)

    Calders, Stijn; Lamy, Hervé; Gamby, Emmanuel; Ranvier, Sylvain

    2014-01-01

    In 2009, the Belgian Institute for Space Aeronomy (BIRA-IASB) initiated the development of BRAMS, a Belgian network of radio receiving stations using forward scattering techniques to detect meteors. The primary goals of the project are (1) to collect data and to provide them to the community; (2) to retrieve information about the meteoroid trajectory; and (3) to study the activity profiles of the main meteor showers. In this paper, the work performed since the 2012 International Meteor Conference in La Palma, Canary Islands, Spain, is presented: (1) a software to decode the GPS signal has been developed and added to all BRAMS stations; (2) a workshop about automatic detection of features in radio data was organized in order to discuss about suitable image processing techniques that can be used for radio meteor echoes detection in the BRAMS spectrograms; (3) to assess the quality of such an image processing technique, a big set of manually counted meteors is necessary. A web application has been developed to support this task and facilitate the comparison of counts by different users; (4) to compute the meteoroid flux and for other applications, the radiation pattern of the different antennas must be known. Someone has been hired recently to make simulations of these radiations patterns as well as to carry out measurement campaigns; and (5) detection of solar flares in BRAMS data has been investigated.

  2. The essential value of projects in faculty development.

    PubMed

    Gusic, Maryellen E; Milner, Robert J; Tisdell, Elizabeth J; Taylor, Edward W; Quillen, David A; Thorndyke, Luanne E

    2010-09-01

    Projects--planned activities with specific goals and outcomes--have been used in faculty development programs to enhance participant learning and development. Projects have been employed most extensively in programs designed to develop faculty as educators. The authors review the literature and report the results of their 2008 study of the impact of projects within the Pennsylvania State University College of Medicine Junior Faculty Development Program, a comprehensive faculty development program. Using a mixed-methods approach, the products of project work, the academic productivity of program graduates, and the impact of projects on career development were analyzed. Faculty who achieved the most progress on their projects reported the highest number of academic products related to their project and the highest number of overall academic achievements. Faculty perceived that their project had three major effects on their professional development: production of a tangible outcome, development of a career focus, and development of relationships with mentors and peers. On the basis of these findings and a review of the literature, the authors conclude that projects are an essential element of a faculty development program. Projects provide a foundation for future academic success by enabling junior faculty to develop and hone knowledge and skills, identify a career focus and gain recognition within their community, generate scholarship, allocate time to academic work, and establish supportive relationships and collaborative networks. A list of best practices to successfully incorporate projects within faculty development programs is provided.

  3. Small Hydropower Research and Development Technology Project

    SciTech Connect

    Blackmore, Mo

    2013-12-06

    The objective of this work was to investigate, develop, and validate the next generation of small hydroturbine generator designs that maximize the energy transfer from flowing water to electrical power generation. What resulted from this effort was the design of a new technology hydroturbine that Near Space Systems (NSS) has named the Star*Stream© Hydroturbine. Using a design that eliminates nearly all of the shortfalls of conventional hydroturbines, the Star*Stream© Hydroturbine employs a new mechanical-to-electrical energy transfer hydro design that operates without lubrication of any kind, and does not introduce foreign chemicals or particulate matter from oil or drive shaft seal degradation into the hydro ecology. In its unique configuration, the Star*Stream© Hydroturbine is nearly environmentally inert, without the negative aspects caused by interrupting the ecological continuity, i.e., disruptions to sedimentation, water quality, habitat changes, human displacement, fish migration, etc., - while it ensures dramatically reduced timeframes to project completion. While a remarkable reduction in LCOE resulting from application of the Star*Stream© Hydroturbine technology has been the core achievement of the this effort, there have been numerous technological breakthroughs from the development effort.

  4. Standard development at the Human Variome Project.

    PubMed

    Smith, Timothy D; Vihinen, Mauno

    2015-01-01

    The Human Variome Project (HVP) is a world organization working towards facilitating the collection, curation, interpretation and free and open sharing of genetic variation information. A key component of HVP activities is the development of standards and guidelines. HVP Standards are systems, procedures and technologies that the HVP Consortium has determined must be used by HVP-affiliated data sharing infrastructure and should be used by the broader community. HVP guidelines are considered to be beneficial for HVP affiliated data sharing infrastructure and the broader community to adopt. The HVP also maintains a process for assessing systems, processes and tools that implement HVP Standards and Guidelines. Recommended System Status is an accreditation process designed to encourage the adoption of HVP Standards and Guidelines. Here, we describe the HVP standards development process and discuss the accepted standards, guidelines and recommended systems as well as those under acceptance. Certain HVP Standards and Guidelines are already widely adopted by the community and there are committed users for the others. © The Author(s) 2015. Published by Oxford University Press.

  5. The Study on Complex Project Management in Developing Countries

    NASA Astrophysics Data System (ADS)

    Yanwen, Wang

    Different factors that can influence project performance have been identified, classified based on their nature, and discussed. Due to the inherent complexity and various problems encountered in implementing infrastructure project in developing countries, the project manager must appreciate the project environment, maintain flexibility, and be competent to analyze the nature of associated problems and their adverse effects on the success of the project, and address these promptly.

  6. Thermal Protection System (Heat Shield) Development - Advanced Development Project

    NASA Technical Reports Server (NTRS)

    Kowal, T. John

    2010-01-01

    The Orion Thermal Protection System (TPS) ADP was a 3 1/2 year effort to develop ablative TPS materials for the Orion crew capsule. The ADP was motivated by the lack of available ablative TPS's. The TPS ADP pursued a competitive phased development strategy with succeeding rounds of development, testing and down selections. The Project raised the technology readiness level (TRL) of 8 different TPS materials from 5 different commercial vendors, eventual down selecting to a single material system for the Orion heat shield. In addition to providing a heat shield material and design for Orion on time and on budget, the Project accomplished the following: 1) Re-invigorated TPS industry & re-established a NASA competency to respond to future TPS needs; 2) Identified a potentially catastrophic problem with the planned MSL heat shield, and provided a viable, high TRL alternate heat shield design option; and 3) Transferred mature heat shield material and design options to the commercial space industry, including TPS technology information for the SpaceX Dragon capsule.

  7. Projects Developed for Library Instruction within the Curriculum.

    ERIC Educational Resources Information Center

    Engeldinger, Eugene A., Comp.; Stevens, Barbara R., Comp.

    A general list of suggestions for effective library instruction and library instruction projects in a variety of disciplines are presented in this guide. Developed in a faculty and academic staff development seminar, the Library within the Curriculum Project, these projects illustrate diverse aproaches to library instruction with the common goal…

  8. A Valuation Method for Multi-Stage Development Projects

    NASA Astrophysics Data System (ADS)

    Kobayashi, Yasuhiro; Kubo, Osamu; Ito, Junko; Ueda, Yoshikatsu

    A real-option based valuation method has been developed for multi-stage development projects which allow flexible stage-wise go/stop judgments. The proposed method measures the economic value of projects from potential future cash flow produced by them, and is characterized by following four functions: (1) Corporation of technical and market risks into project valuation, (2) Quantification of a project portfolio value, (3) Modeling of correlation between individual projects in a portfolio, and (4) Control of project portfolio risk with a risk index.

  9. Development of an Industrial Engineering Project

    ERIC Educational Resources Information Center

    Moreno, Lorenzo; Gonzalez, Evelio; Acosta, Leopoldo; Toledo, Jonay; Marichal, Nicolas; Hamilton, Alberto; Sigut, Marta; Mendez, J. Albino; Hernandez, Sergio; Torres, Santiago

    2005-01-01

    This paper presents a teaching strategy of the scheduling and developmental phase of an Industrial Engineering computer project. It is based on a real project which has been carried out by our department in collaboration with a local company. The classroom setting provides an environment where students can experience firsthand all phases of the…

  10. Professional Practice Projects: APEL or Development?

    ERIC Educational Resources Information Center

    Lester, Stan

    2007-01-01

    Purpose: This paper sets out to examine whether the process of accrediting prior experiential learning (APEL) as used in UK universities is the most appropriate approach for providing academic recognition for work-based projects and learning. Design/methodology/approach: Work-based projects that had already been assessed in the context of a…

  11. Development of an Industrial Engineering Project

    ERIC Educational Resources Information Center

    Moreno, Lorenzo; Gonzalez, Evelio; Acosta, Leopoldo; Toledo, Jonay; Marichal, Nicolas; Hamilton, Alberto; Sigut, Marta; Mendez, J. Albino; Hernandez, Sergio; Torres, Santiago

    2005-01-01

    This paper presents a teaching strategy of the scheduling and developmental phase of an Industrial Engineering computer project. It is based on a real project which has been carried out by our department in collaboration with a local company. The classroom setting provides an environment where students can experience firsthand all phases of the…

  12. Professional Practice Projects: APEL or Development?

    ERIC Educational Resources Information Center

    Lester, Stan

    2007-01-01

    Purpose: This paper sets out to examine whether the process of accrediting prior experiential learning (APEL) as used in UK universities is the most appropriate approach for providing academic recognition for work-based projects and learning. Design/methodology/approach: Work-based projects that had already been assessed in the context of a…

  13. Nutrition Education Today. A Curriculum Development Project.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento.

    Nutrition Education Today is a state-funded curriculum project that addresses the behavioral aspects of nutrition as well as the nutritional knowledge of secondary school students in California. The curriculum design for the Nutrition Education Today project is a result of the efforts of a statewide task force of specialists in the area of…

  14. Outcomes of the Instructional Systems Development Project.

    ERIC Educational Resources Information Center

    Branson, Robert K.

    This project sought to meet documented Army training needs through the application of system analytic procedures. When doctrine, regulations, and school organization were investigated, it was found that regulations were clear and comprehensive, but that school organization lacked a clear training evaluation component. During the project, the Army…

  15. Developing Learning Strategies Based on Research Projects

    ERIC Educational Resources Information Center

    Ampuero-Canellas, Olga; Gonzalez-Del-Rio, Jimena; Jorda-Albinana, Begona; Rojas-Sola, Jose Ignacio

    2011-01-01

    Research projects are a very important part of any professor life sheet. Through these projects, they use their knowledge to solve real problems within professional area. Besides being an advance in research area, they can essentially contribute to improving teaching process. This work originates from the idea that the experienced gotten from…

  16. Survey of the Hokkaido development project

    NASA Astrophysics Data System (ADS)

    1992-03-01

    As a part of the survey of the Hokkaido development project, geothermal resources and mineral resources are investigated in the north area of Tokachi. The temperature of geothermal water is 45-77 C in the bottom of the mines of which the depth is 1000-1300 m. Application fields of geothermal water are space heating, heat source for fishery facilities, bathing, etc. Presently it is used in 10 bathing places, 10 space heating facilities and 11 agricultural and fishery facilities. It is used mostly for public facilities and will be effective for general house hot water supply and preparation of sightseeing places in the future. As measures for effective utilization, hydrothermal systems used in health community plaza, horticultural greenhouse and general house hot water supply are designed, and great effectness in energy saving and economy is indicated. There exist zeolite deposits which produce 7000 tons/year in the Seta area of Kami-Shihoro-cho surveyed. Minable amount of zeolite in the Kami-Shihoro area is estimated at 800,000 m(sup 3). Production of natural zeolite in Japan is 140,000 tons/year, which is used mostly for agricultural soil conditioner and also for industrial drying, adsorptional separation and water treatment. With the expanding utilization field, it is expected to contribute to activation of the regional economy.

  17. Development of Research Projects in Advanced Laboratory

    NASA Astrophysics Data System (ADS)

    Yu, Ping; Guha, Suchi

    2008-04-01

    Advanced laboratory serves as a bridge spanning primary physics laboratory and scientific research or industrial activities for undergraduate students. Students not only study modern physics experiments and techniques but also acquire the knowledge of advanced instrumentation. It is of interest to encourage students using the knowledge into research projects at a later stage of the course. We have designed several scientific projects for advanced laboratory to promote student's abilities of independent research. Students work as a team to select the project and search literatures, to perform experiments, and to give presentations. During the research project, instructor only provides necessary equipment for the project without any pre-knowledge of results, giving students a real flavor of scientific research. Our initial attempt has shown some interesting results. We found that students showed a very strong motivation in these projects, and student performances exceeded our expectation. Almost all the students in our first batch of the course have now joined graduate school in Physics and Materials Science. In the future we will also arrange graduate students working with undergraduate students to build a collaborative environment. In addition, a more comprehensive method will be used to evaluate student achievements.

  18. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    NASA Technical Reports Server (NTRS)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  19. Career Development Outreach Program Exemplary Project. Final Report.

    ERIC Educational Resources Information Center

    Sommer, Sharon L.

    The document is the final report of the career development outreach project. The project was designed to actively involve a systematic program of career education, dissemination of occupational information, and career guidance. The project was to make the target population (students, faculty, and staff at the University of Maine at Farmington and…

  20. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  1. Framework for Project Development in the Renewable Energy Sector

    SciTech Connect

    Springer, R.

    2013-02-01

    The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

  2. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    NASA Technical Reports Server (NTRS)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  3. Veicolarita e linguaggio scientifico--analisi del primo "Progetto italiano per studenti universitari somali" (Languages for Special Purposes and Scientific Usage--An Analysis of the First "Italian Project for Somali University Students").

    ERIC Educational Resources Information Center

    Amato, Antonio

    1979-01-01

    The development of an intensive Italian course for science students attending Somalia's National University is described. The historical background for this project, sponsored by the Italian Government and staffed by Italian teachers, is outlined. Course objectives, methods, and organization are illustrated by samples of instructional materials,…

  4. Veicolarita e linguaggio scientifico--analisi del primo "Progetto italiano per studenti universitari somali" (Languages for Special Purposes and Scientific Usage--An Analysis of the First "Italian Project for Somali University Students").

    ERIC Educational Resources Information Center

    Amato, Antonio

    1979-01-01

    The development of an intensive Italian course for science students attending Somalia's National University is described. The historical background for this project, sponsored by the Italian Government and staffed by Italian teachers, is outlined. Course objectives, methods, and organization are illustrated by samples of instructional materials,…

  5. 30 CFR 402.11 - Technology-development project applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.11 Technology-development project applications. (a) Grant awards will be used to... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Technology-development project...

  6. Managing Development Projects: A Selected, Annotated Bibliography. Annotated Bibliography #5.

    ERIC Educational Resources Information Center

    Chuenyane, Zachariah; And Others

    A selected annotated bibliography on managing development projects, intended for rural development practitioners, highlights items that outline some pressing issues and concerns confronting those involved in rural development in general and rural project management in particular. A section of annotated entries lists 21 publications on project…

  7. 30 CFR 402.11 - Technology-development project applications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Technology-development project applications... RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.11 Technology-development project applications. (a) Grant awards will be used to...

  8. 30 CFR 402.11 - Technology-development project applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Technology-development project applications... RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.11 Technology-development project applications. (a) Grant awards will be used to...

  9. 30 CFR 402.11 - Technology-development project applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Technology-development project applications... RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.11 Technology-development project applications. (a) Grant awards will be used to...

  10. 30 CFR 402.11 - Technology-development project applications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Technology-development project applications... RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.11 Technology-development project applications. (a) Grant awards will be used to...

  11. Learning in science project (teacher development): The framework

    NASA Astrophysics Data System (ADS)

    Bell, Beverley F.; Kirkwood, Valda M.; Pearson, John D.

    1990-01-01

    The Centre for Science and Mathematics Education Research at the University of Waikato is now undertaking the fourth Learning in Science Project, LISP(Teacher Development). The project builds on the findings of the previous three projects on the nature of learning and how to improve learning of science in classrooms. This two-year project is investigating the process of teacher development (as change in behaviour and beliefs) in the context of two kinds of teacher courses that acknowledge and take into account teachers’ existing ideas. This paper summarises the planning done for the first phase of the project as detailed in Bell, Kirkwood and Pearson (1990).

  12. Designing for Science: Oxford School Development Project.

    ERIC Educational Resources Information Center

    Department of Education and Science, London (England).

    Design features are described for a science building for a large boys' school in Oxford, England. General considerations of the project are discussed; and specific information is provided for each subject department (general science, biology, chemistry, and physics) and for preparation and storage facilities, a central workshop, and a library.…

  13. Integrating HCI Specialists into Open Source Software Development Projects

    NASA Astrophysics Data System (ADS)

    Hedberg, Henrik; Iivari, Netta

    Typical open source software (OSS) development projects are organized around technically talented developers, whose communication is based on technical aspects and source code. Decision-making power is gained through proven competence and activity in the project, and non-technical end-user opinions are too many times neglected. In addition, also human-computer interaction (HCI) specialists have encountered difficulties in trying to participate in OSS projects, because there seems to be no clear authority and responsibility for them. In this paper, based on HCI and OSS literature, we introduce an extended OSS development project organization model that adds a new level of communication and roles for attending human aspects of software. The proposed model makes the existence of HCI specialists visible in the projects, and promotes interaction between developers and the HCI specialists in the course of a project.

  14. Development and implementation of a residency project advisory board.

    PubMed

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  15. Achievement Motivation Development Project. Final Report. Appendix IV, Part 2.

    ERIC Educational Resources Information Center

    McClelland, David C.; Alschuler, Alfred S.

    The Achievement Motivation Development Project is described. The Project has culminated in the development of course materials designed explicitly to promote aspects of psychological growth. As such, it is viewed as but one thrust in an emerging psychological education movement. Achievement motivation is defined as a way of planning, a set of…

  16. Teachers' Reflections on an Education for Sustainable Development Project

    ERIC Educational Resources Information Center

    Villanen, Heli

    2014-01-01

    Sustainable development includes controversial values and complex issues such as energy consumption contra natural resources. This paper discusses a school project involving teachers from pre-schools to upper secondary schools in Sweden. The project aimed to support the teaching of energy issues and more generally sustainable development. During…

  17. Teachers' Reflections on an Education for Sustainable Development Project

    ERIC Educational Resources Information Center

    Villanen, Heli

    2014-01-01

    Sustainable development includes controversial values and complex issues such as energy consumption contra natural resources. This paper discusses a school project involving teachers from pre-schools to upper secondary schools in Sweden. The project aimed to support the teaching of energy issues and more generally sustainable development. During…

  18. Achievement Motivation Development Project. Final Report. Appendix IV, Part 2.

    ERIC Educational Resources Information Center

    McClelland, David C.; Alschuler, Alfred S.

    The Achievement Motivation Development Project is described. The Project has culminated in the development of course materials designed explicitly to promote aspects of psychological growth. As such, it is viewed as but one thrust in an emerging psychological education movement. Achievement motivation is defined as a way of planning, a set of…

  19. The Empty Shops Project: Developing Rural Students' Sociological Insight

    ERIC Educational Resources Information Center

    Willis, Evan; Burns, Edgar

    2011-01-01

    An informal research project with high local relevance was developed for a first-year sociology course at an Australian rural university campus. The project developed students' sociological insight by challenging them to investigate "truths" about their own region, rather than immediately pushing them to comprehend new and different…

  20. Process development status report for advanced manufacturing projects

    SciTech Connect

    Brinkman, J.R.; Homan, D.A.

    1990-03-30

    This is the final status report for the approved Advanced Manufacturing Projects for FY 1989. Five of the projects were begun in FY 1987, one in FY 1988, and one in FY 1989. The approved projects cover technology areas in welding, explosive material processing and evaluation, ion implantation, and automated manufacturing. It is expected that the successful completion of these projects well result in improved quality and/or reduced cost for components produced by Mound. Those projects not brought to completion will be continued under Process development in FY 1990.

  1. Effective Monitoring and Control of Outsourced Software Development Projects

    NASA Astrophysics Data System (ADS)

    Ponisio, Laura; Vruggink, Peter

    In our study of four outsourcing projects we discover mechanisms to support managerial decision making during software development processes. We report on Customer Office, a framework used in practice that facilitates reasoning about projects by highlighting information paths and making co-ordination issues explicit. The results suggest a key role of modularisation and standardisation to assist in value creation, by facilitating information flow and keeping the overview of the project. The practical implications of our findings are guidelines for managing outsourcing projects such as to have a modularised view of the project based on knowledge domains and to standardise co-ordination operations.

  2. MBSE in Development: SMAP Pilot Project

    NASA Technical Reports Server (NTRS)

    Donahue, Kenny; Kadesch, Alex; Khan, Omair; Post, Ethan; Gomez-Mustafa, Jose; McKelvin, Mark; Sneddon, Scott; Day, John; Ingham, Mitch; Jimenez, Alex; hide

    2012-01-01

    Customer-focused objective: Provide value to a flight project using Model-Based Systems Engineering (MBSE) methodology and products. Institution-focused objective: Advance and improve our systems engineering practices, leveraging MBSE where applicable: Streamline our interfaces across JPL Divisions, to provide better cross-organization products; Streamline our interfaces across lifecycle phase boundaries; Update our SE practices to make them more competitive and able to handle systems of ever-increasing complexity.

  3. MBSE in Development: SMAP Pilot Project

    NASA Technical Reports Server (NTRS)

    Donahue, Kenny; Kadesch, Alex; Khan, Omair; Post, Ethan; Gomez-Mustafa, Jose; McKelvin, Mark; Sneddon, Scott; Day, John; Ingham, Mitch; Jimenez, Alex; Salvo, Chris; Standley, Shaun

    2012-01-01

    Customer-focused objective: Provide value to a flight project using Model-Based Systems Engineering (MBSE) methodology and products. Institution-focused objective: Advance and improve our systems engineering practices, leveraging MBSE where applicable: Streamline our interfaces across JPL Divisions, to provide better cross-organization products; Streamline our interfaces across lifecycle phase boundaries; Update our SE practices to make them more competitive and able to handle systems of ever-increasing complexity.

  4. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  5. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  6. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    NASA Astrophysics Data System (ADS)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  7. Integrating Teachers' Career Development and Professional Development: The Science Education Professional Development Project.

    ERIC Educational Resources Information Center

    Ingvarson, Lawrence

    This paper describes the Science Education Professional Development Project in Australia, charged with the development of a national strategy for enhancing professional development of science teachers. Interviews were conducted with senior policy officers, science teachers' associations and unions, and 80 science teachers in 12 secondary schools.…

  8. Development Education. A Brief Description of the Project and an Interim Definition of Development Education.

    ERIC Educational Resources Information Center

    Haarhuis, J. Mistrate; And Others

    In this five-part essay, a project concerning development education at the secondary school level in the Netherlands is discussed. The project, entitled Educational Project Development Cooperation (EPOS), will work closely with schools and develop teaching-learning packages and model core curricula to teach students about the moral responsibility…

  9. Developing a rating scale for projected stories.

    PubMed

    Dent-Brown, Kim; Wang, Michael

    2004-09-01

    The Six-part Story Method (6PSM) is a projective tool in wide use by dramatherapists in the UK, USA and Israel (Lahad & Ayalon, 1993). In contrast to projective tests used by psychotherapists and psychologists, the 6PSM has never been the subject of any validation or reliability studies. This study reports on the identification of scale items to describe the manifest content of six-part stories. In all, 26 statements with acceptable inter-rater reliability have been identified. These statements were used to rate stories produced by clinicians (N = 24) mainstream community mental health patients (N = 21) and patients with a borderline personality disorder (N = 19). Some features that were expected to be indicators of an author with a BPD diagnosis proved to be as common in stories from other authors. However, a scale of eight items was identified that differentiated well between authors with a BPD diagnosis and others, with adequate test-retest and inter-rater reliability. Concurrent validity was tested against the Structured Clinical Interview for DSM-IV Axis II (SCID-II), the Clinical Outcomes in Routine Evaluation Outcome Measure (CORE-OM) and the Inventory of Interpersonal Problems--Short Form (IIP-32).

  10. Power plant development at Mammoth Project

    SciTech Connect

    Holt, B.; Campbell, R.G.

    1984-04-01

    The Mammoth Geothermal Project is located within the Long Valley Known Geothermal Resources Area (KGRA) on the eastern slope of the Sierra Nevada mountain range of California some 300 miles north of Los Angeles. The plant is owned by Mammoth-Pacific (M-P), a joint venture of Pacific Energy Resources Incorporated and Mammoth Binary Power Company. The plan is to build two identical 3500 kW (net) air-cooled binary cycle geothermal power plants scheduled for completion in mid 1984. Nearly all the residential and commercial space heating in the Mammoth Lakes area is electrical. Electrical usage peaks in the wintertime, unlike the rest of the Edison system. While some power is provided by hydro plants in the area, most of the Edison supply arrives via a transmission line connecting to Edison facilities in the Mojave desert some 200 miles to the south. Peak power consumption in the area is about 40 MWe. The need to augment energy needs in the area by producing electricity from geothermal resources and using geothermal heat to replace electricity for space heating has long been recognized. The feasibility of this project is discussed.

  11. Development of Risk Uncertainty Factors from Historical NASA Projects

    NASA Technical Reports Server (NTRS)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  12. Solar electric thermal hydronic (SETH) product development project

    SciTech Connect

    Stickney, B.L.; Sindelar, A.

    2000-10-01

    Positive Energy, Inc. received a second Technology Maturation and Commercialization Project Subcontract during the 1999 round of awards. This Subcontract is for the purpose of further aiding Positive Energy, Inc. in preparing its Solar Electric Thermal Hydronic (SETH) control and distribution package for market introduction. All items of this subcontracted project have been successfully completed. This Project Report contains a summary of the progress made during the SETH Development Project (the Project) over the duration of the 1999 Subcontract. It includes a description of the effort performed and the results obtained in the pursuit of intellectual property protection and development of product documentation for the end users. This report also summarizes additional efforts taken by and for the SETH project outside of the Subcontract. It presents a chronology of activities over the duration of the Subcontract, and includes a few selected sample copies of documents offered as evidence of their success.

  13. Involvement of Students with Disabilities in the New American Schools Development Corporation Projects. Project FORUM.

    ERIC Educational Resources Information Center

    Ahearn, Eileen M.

    This study examined the involvement of students with disabilities in the New American Schools Development Corporation (NASDC) projects. The report begins with a description of the competition to select demonstration projects that would create teams to design, implement, and disseminate "break-the-mold" schools to bring about educational…

  14. Comprehensive Career Development Project: Career Center Guide.

    ERIC Educational Resources Information Center

    Tennessee Univ., Knoxville. Dept. of Technological and Adult Education.

    This guide provides information for developing a career center that would serve as the major resource for information about the world of work. These steps in initiating a career center are outlined: designing and conducting a needs assessment, choosing the location, developing advisory committee and principal support, and staffing. The next…

  15. A Systems Development Life Cycle Project for the AIS Class

    ERIC Educational Resources Information Center

    Wang, Ting J.; Saemann, Georgia; Du, Hui

    2007-01-01

    The Systems Development Life Cycle (SDLC) project was designed for use by an accounting information systems (AIS) class. Along the tasks in the SDLC, this project integrates students' knowledge of transaction and business processes, systems documentation techniques, relational database concepts, and hands-on skills in relational database use.…

  16. Guidance and Control Software Project Data - Volume 2: Development Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  17. The Guelph Rural Development Outreach Project: A Canadian Experience.

    ERIC Educational Resources Information Center

    Findlay, E. Weldon; And Others

    The University of Guelph Rural Development Outreach Project (RDOP) as it was conceived, organized and utilized in rural communities in Ontario is the major focus of this document; the concluding sections describe some of the problems of Outreach implementation and suggest some possible courses for continuing and expanding the project. There is…

  18. QFD Application to a Software - Intensive System Development Project

    NASA Technical Reports Server (NTRS)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  19. Developing a European Practitioner Qualification: The TRAVORS2 Project

    ERIC Educational Resources Information Center

    Lester, Stan

    2013-01-01

    The TRAVORS projects, supported by the European Union's Lifelong Learning Programme, ran between 2008 and 2012. Their object was to develop training programmes for disability employment practitioners across nine countries based on proven approaches both to vocational rehabilitation and to skills training. The second of the two projects aimed to…

  20. Faculty Development for Institutional Change: Lessons from an Advance Project

    ERIC Educational Resources Information Center

    Laursen, Sandra; Rocque, Bill

    2009-01-01

    The ADVANCE Institutional Transformation projects are remarkably diverse in their theories of action and choice of strategies. However, faculty development plays a role in many, and it was the central change strategy chosen by Leadership Education for Advancement and Promotion (LEAP), the 2002-2008 ADVANCE project at the University of Colorado at…

  1. Developing a European Practitioner Qualification: The TRAVORS2 Project

    ERIC Educational Resources Information Center

    Lester, Stan

    2013-01-01

    The TRAVORS projects, supported by the European Union's Lifelong Learning Programme, ran between 2008 and 2012. Their object was to develop training programmes for disability employment practitioners across nine countries based on proven approaches both to vocational rehabilitation and to skills training. The second of the two projects aimed to…

  2. Teachers' Learning in a Research and Development Work Project

    ERIC Educational Resources Information Center

    Postholm, May Britt

    2011-01-01

    This article focuses on teachers' learning in a research and development (R&D) work project. The teachers are working in a lower secondary school, and the cooperation between them and the researcher lasted for two years. The aim of this article is to show what teachers can learn and how they can learn during such a project. In the qualitative…

  3. Teachers' Learning in a Research and Development Work Project

    ERIC Educational Resources Information Center

    Postholm, May Britt

    2011-01-01

    This article focuses on teachers' learning in a research and development (R&D) work project. The teachers are working in a lower secondary school, and the cooperation between them and the researcher lasted for two years. The aim of this article is to show what teachers can learn and how they can learn during such a project. In the qualitative…

  4. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  5. Open Crowdsourcing: Leveraging Community Software Developers for IT Projects

    ERIC Educational Resources Information Center

    Phair, Derek

    2012-01-01

    This qualitative exploratory single-case study was designed to examine and understand the use of volunteer community participants as software developers and other project related roles, such as testers, in completing a web-based application project by a non-profit organization. This study analyzed the strategic decision to engage crowd…

  6. A Project for Research, Development, and Evaluation Training. Final Report.

    ERIC Educational Resources Information Center

    Karr, Chadwick; Porter, Bette C.

    This report summarizes and evaluates the 1969-70 Consortium Research Development (CORD) training and dissemination project conducted by Teaching Research, Oregon State System of Higher Education. The project provided a 2-week summer institute to train selected college and university staff from CORD institutions in the use of individualized,…

  7. Tech Prep Intergenerational Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock.

    A project was conducted at Texas Tech University to develop a competency-based curriculum to support statewide implementation of tech prep intergenerational programs (careers in providing services to well elderly persons and to children). Project activities included the following: (1) revision and expansion of the Intergenerational Target…

  8. "Kids R Bi-Bi": Sign Talk Development Project.

    ERIC Educational Resources Information Center

    Evans, Charlotte; Zimmer, Kyra

    Sign Talk Development Project (STDP) is a four-pronged project that grows out of needs identified through the program of Sign Talk Children's Centre (STCC). STCC is a bilingual/bicultural day care for children of deaf parents in Winnipeg, Manitoba. The center offers programming in two languages, American Sign Language (ASL) and English; and in two…

  9. What's Where? A Catalog of Products Developed by HCEEP Projects.

    ERIC Educational Resources Information Center

    Jackson, Joyce F., Comp.; May, Marcia J., Comp.

    The catalog lists 126 products developed by 30 HCEEP projects (Handicapped Children's Early Education Projects). Products are arranged alphabetically by title and include information on author, date, pagination, intended audience, content, availability source, and price. Products listed cover such aspects as activity guides, behavior management,…

  10. Open Crowdsourcing: Leveraging Community Software Developers for IT Projects

    ERIC Educational Resources Information Center

    Phair, Derek

    2012-01-01

    This qualitative exploratory single-case study was designed to examine and understand the use of volunteer community participants as software developers and other project related roles, such as testers, in completing a web-based application project by a non-profit organization. This study analyzed the strategic decision to engage crowd…

  11. Tucson Solar Village: Project management. A project in sustainable community development

    SciTech Connect

    Not Available

    1991-11-01

    The Tucson Solar Village is a Design/Build Project In Sustainable Community Development which responds to a broad spectrum of energy, environmental, and economic challenges. This project is designed for 820 acres of undeveloped State Trust Land within the Tucson city limits; residential population will be five to six thousand persons with internal employment provided for 1200. This is a 15 year project (for complete buildout and sales) with an estimated cost of $500 million. Details of the project are addressed with emphasis on the process and comments on its transferability.

  12. 15 CFR 292.2 - Training development and deployment projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Training development and deployment... MANUFACTURING EXTENSION PARTNERSHIP; INFRASTRUCTURE DEVELOPMENT PROJECTS § 292.2 Training development and... support the development and deployment of training programs which will aid manufacturing extension...

  13. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2010-01-01

    NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several sub-elements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles' thermal control system. NASA's Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

  14. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2009-01-01

    NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems (LSS) project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several subelements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles thermal control system. NASA s Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of approximately six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

  15. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2009-01-01

    NASA s Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several subelements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles thermal control system. NASA s Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids. The current paper will provide an update to a similar overview paper published at last year s International Conference on Environmental Systems (ICES).

  16. Biomass Gasification Research and Development Project

    SciTech Connect

    Ahring, Birgitte K.

    2014-07-22

    The overall objective of the BioChemCat project was to demonstrate the feasibility of using Advanced Wet Oxidation Steam-Explosion (AWEx) process to open and solubilize lignocellulosic biomass (LBM) coupled to an innovative mixed culture fermentation technology capable of producing a wide range of volatile fatty acids (VFAs) from all sugars present in LBM. The VFAs will then be separated and converted to hydrocarbon biofuel through catalytic upgrading. By continuously removing VFAs as they are produced (extractive fermentation), we were able to recover the VFAs while both eliminating the need for pH adjustment and increasing the fermentation productivity. The recovered VFAs were then esterified and upgraded to hydrocarbon fuels through a parallel series of hydrogenolysis/decarboxylation and dehydration reactions. We also demonstrated that a portion of the residual lignin fraction was solubilized and converted into VFAs, also improving the yields of VFAs. The remaining lignin fraction was then shown to be available (after dewatering and drying) for use as a lignin-enriched fuel pellet or as a feedstock for further processing.

  17. Incremental development and prototyping in current laboratory software development projects: Preliminary analysis

    NASA Technical Reports Server (NTRS)

    Griesel, Martha Ann

    1988-01-01

    Several Laboratory software development projects that followed nonstandard development processes, which were hybrids of incremental development and prototyping, are being studied. Factors in the project environment leading to the decision to use a nonstandard development process and affecting its success are analyzed. A simple characterization of project environment based on this analysis is proposed, together with software development approaches which have been found effective for each category. These approaches include both documentation and review requirements.

  18. NASA Remediation Technology Collaboration Development Task, Overview and Project Summaries

    NASA Technical Reports Server (NTRS)

    Romeo, James G.

    2014-01-01

    An overview presentation of NASA's Remediation Technology Collaboration Development Task including the following project summaries: in situ groundwater monitor, in situ chemical oxidation, in situ bioremediation, horizontal multi-port well, and high resolution site characterization.

  19. EPA, Pueblo of Cochiti Develop Green Infrastructure Projects

    EPA Pesticide Factsheets

    DALLAS - (Sept. 30, 2015) As different areas of the country become drier and hotter, the U.S. Environmental Protection Agency (EPA) and the Pueblo of Cochiti, New Mexico, are developing green infrastructure projects that address water needs. The EPA

  20. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    SciTech Connect

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  1. The FAIR Project: Status and New Developments

    SciTech Connect

    Schmitt, Lars

    2006-07-11

    Detailed planning and R and D for both, the accelerator and the experimental systems of the future international Facility for Antiproton and Ion Research (FAIR) is in progress on many fronts. It involves a wide range of activities, both at laboratories in partner countries participating in the preparatory activities as well as at GSI.This report summarizes the current situation, with emphasis on recent important developments. This includes new performance aspects of FAIR, in particular also the plans towards QCD spin physics with polarized anti-protons. An outlook on facility development and construction is given.

  2. Developing Multiple Literacies in a Website Project

    ERIC Educational Resources Information Center

    Spence, Lucy K.

    2009-01-01

    Jacky, an 11-year-old biliterate Latina, was the subject of this case study. She used her home funds of knowledge to become computer literate through the development of a website focused on Mexican heritage. The website, created via funds of knowledge drawn from the community, in turn involved families and the local community in computer…

  3. Aquantis Ocean Current Turbine Development Project Report

    SciTech Connect

    Fleming, Alex J.

    2014-08-23

    The Aquantis® Current Plane (“C-Plane”) technology developed by Dehlsen Associates, LLC (DA) and Aquantis, Inc. is an ocean current turbine designed to extract kinetic energy from ocean currents. The technology is capable of achieving competitively priced base-load, continuous, and reliable power generation from a source of renewable energy not before possible in this scale or form.

  4. Achievement Motivation Development Project. Final Report.

    ERIC Educational Resources Information Center

    McClelland, Dave C.; Alschuler, Alfred S.

    Two efforts were made to develop achievement motivation in school children and to observe the effect of such training on their behavior in and out of school. These studies were undertaken because: (1) Achievement motivation might help children think more seriously about their work habits and career planning; (2) It might improve the grades of…

  5. Assessing Language Development: The Crediton Project.

    ERIC Educational Resources Information Center

    Wilkinson, Andrew; And Others

    This paper offers a review of methods of judging the quality of English compositions and demonstrates the need for establishing criteria to judge composition work in a developmental context. Scales of development designed to meet that need are categorized as: stylistic measures that include structure/organization, syntax, verbal competence, reader…

  6. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... that contribute to REE program objectives and help carry out the REE mission. The Cooperator's PI and... Cooperator's PI and the awarding Agency's ADODR consisting of the following: (1) Objective (2) Approach (3... shall be jointly developed by the REE ADODR and the Cooperator PI outlining the following...

  7. Evaluating success of mobile health projects in the developing world.

    PubMed

    Ginige, J Anupama; Maeder, Anthony J; Long, Vanessa

    2014-01-01

    Many mobile health (mHealth) projects, typically deploying pilot or small scale implementations, have been undertaken in developing world settings and reported with a widely varying range of claims being made on their effectiveness and benefits. As a result, there is little evidence for which aspects of such projects lead to successful outcomes. This paper describes a literature review of papers from PubMed undertaken to identify strong contributions to execution and evaluation of mHealth projects in developing world settings, and suggests a template for classifying the main success factors to assist with collating evidence in the future.

  8. Advanced Software Development Workstation Project, phase 3

    NASA Technical Reports Server (NTRS)

    1991-01-01

    ACCESS provides a generic capability to develop software information system applications which are explicitly intended to facilitate software reuse. In addition, it provides the capability to retrofit existing large applications with a user friendly front end for preparation of input streams in a way that will reduce required training time, improve the productivity even of experienced users, and increase accuracy. Current and past work shows that ACCESS will be scalable to much larger object bases.

  9. Nursing Professional Development Organizational Value Demonstration Project.

    PubMed

    Harper, Mary G; Aucoin, Julia; Warren, Joan I

    2016-01-01

    A common question nursing professional development (NPD) practitioners ask is, "How many NPD practitioners should my organization have?" This study examined correlations among facility size and structure, NPD practitioner characteristics and time in service, and organizational outcomes. Organizations with a higher rate of NPD full-time equivalents per bed had higher patient satisfaction with nurses' communication and provision of discharge instruction on their HCAHPS (Hospital Consumer Assessment of Healthcare Provider and Systems) scores.

  10. Project CIVTEC: A State-Wide Curriculum Development Project in Engineering Technology.

    ERIC Educational Resources Information Center

    Smith, James D., Jr.; And Others

    The CET (Civil Engineering Technology) project was a statewide curriculum development effort to develop an instructional format to train civil engineering technicians in South Carolina. It was designed to: (1) identify specific job competencies; (2) develop an individualized, self-paced instructional format complete with software and equipment;…

  11. SWANA/NREL/DOE landfill methane model development project

    SciTech Connect

    Augenstein, D.; Vogt, W.G.; Demers, S.T.

    1996-11-01

    Landfill methane models are widely used to project landfill methane (gas) generation and recovery, as well as landfill emissions to the atmosphere. While several models are used in the landfill gas industry and elsewhere, their {open_quotes}validation{close_quotes} is still, at best, limited. Validation is, simply, adjusting model parameters so that models best project methane recovery field data, or else, demonstrating that models project methane recovery actually experienced. Limited data have been used to develop most models. In addition, models have generally validated methane recovery against projections over relatively short intervals or at only single {open_quotes}points in time{close_quotes} whereas comparisons over longer terms would be desirable. Thus, confidence limits to be assigned to model projections are in large part unknown. In addition, failures of models have been (if anecdotally) reported. In some cases, energy equipment has been installed and left idle reportedly because landfill gas has been less than expected. In light of this situation, this project`s purpose has been to verify and validate models based on data from a greater number of landfills in the past, using gas recovery data over longer terms (several years when possible). Another objective is to use these data to develop a better estimate of key parameters, yield and kinetic coefficients, and associated confidence limits which may be assigned to model projections.

  12. Project Jefferson and the Development of Research Skills.

    ERIC Educational Resources Information Center

    Lynch, Anne

    1989-01-01

    Describes the software package developed as a result of a project aimed at developing an effective model of computer assisted instruction to encourage the development of research and critical thinking skills among students. The package includes modules for class assignments, encyclopedic background information, a citations database, and access to…

  13. National Curriculum Projects and Development in Education. A Working Note.

    ERIC Educational Resources Information Center

    Marks, Joan

    The purposes of this report are to assess the need for federally supported curriculum development in education, and if there is a need, to determine appropriate policies for conducting development and supporting implementation. The assessment is based on the national curriculum development projects that have been sponsored since 1956 by the…

  14. Mammalian Kidney Development: Principles, Progress, and Projections

    PubMed Central

    Little, Melissa H.; McMahon, Andrew P.

    2012-01-01

    The mammalian kidney is a vital organ with considerable cellular complexity and functional diversity. Kidney development is notable for requiring distinct but coincident tubulogenic processes involving reciprocal inductive signals between mesenchymal and epithelial progenitor compartments. Key molecular pathways mediating these interactions have been identified. Further, advances in the analysis of gene expression and gene activity, coupled with a detailed knowledge of cell origins, are enhancing our understanding of kidney morphogenesis and unraveling the normal processes of postnatal repair and identifying disease-causing mechanisms. This article focuses on recent insights into central regulatory processes governing organ assembly and renal disease, and predicts future directions for the field. PMID:22550230

  15. NASA's Robotic Lunar Lander Development Project

    NASA Technical Reports Server (NTRS)

    Cohen, Barbara A.

    2012-01-01

    Since early 2005, NASA's Robotic Lunar Lander Development (RLLD) office at NASA MSFC, in partnership with the Applied Physics Laboratory (APL), has developed mission concepts and preformed risk-reduction activities to address planetary science and exploration objectives uniquely met with landed missions. The RLLD team developed several concepts for lunar human-exploration precursor missions to demonstrate precision landing and in-situ resource utilization, a multi-node lunar geophysical network mission, either as a stand-alone mission, or as part of the International Lunar Network (ILN), a Lunar Polar Volatiles Explorer and a Mercury lander mission for the Planetary Science decadal survey, and an asteroid rendezvous and landing mission for the Exploration Precursor Robotics Mission (xPRM) office. The RLLD team has conducted an extensive number of risk-reduction activities in areas common to all lander concepts, including thruster testing, propulsion thermal control demonstration, composite deck design and fabrication, and landing leg stability and vibration. In parallel, the team has developed two robotic lander testbeds providing closed-loop, autonomous hover and descent activities for integration and testing of flight-like components and algorithms. A compressed-air test article had its first flight in September 2009 and completed over 150 successful flights. This small test article (107 kg dry/146 kg wet) uses a central throttleable thruster to offset gravity, plus 3 descent thrusters (37lbf ea) and 6 attitude-control thrusters (12lbf ea) to emulate the flight system with pulsed operation over approximately 10s of flight time. The test article uses carbon composite honeycomb decks, custom avionics (COTS components assembled in-house), and custom flight and ground software. A larger (206 kg dry/322 kg wet), hydrogen peroxide-propelled vehicle began flight tests in spring 2011 and fly over 30 successful flights to a maximum altitude of 30m. The monoprop testbed

  16. Westinghouse gasification technology development and projects status

    SciTech Connect

    Daugherty, D. P.; Schmidt, D. K.

    1982-01-01

    A joint program between Westinghouse, the Department of Energy, and the Gas Research Institute has shown, through the use of a 35 ton-per-day coal feed process development unit (PDU), that the fluidized bed gasifier is technically feasible and economically attractive. The process has been shown to be simple, controllable, and safe in converting many types of coals, including reactive western coals, caking eastern coals, high ash coals, and run-of-mine coals. The process is efficient because it utilizes many coals at high conversion efficiency with relatively low use of oxidant and steam. Because of its simplicity, its use of available hardware technology, and the absence of tars in the product gas, the system has low capital and operating costs. It can be employed with little adverse environmental impact because of its efficiency, low pollutant output, low water usage, and disposal ash product. Process advantages have been confirmed by independent conceptual designs and cost estimates for commercial-scale applications, including substitute natural gas (SNG), industrial fuel gas, liquid synfuels, and combined cycle power generation. The development program includes unique cost-effective integration of hot and cold small-scale experimental models, a commercial-scale cold flow model, and analytical modeling, together with the PDU, to provide commercial design procedures. Westinghouse commercial designs are utilizing these design tools and the process is now being scaled-up for a commercial-scale demonstration facility.

  17. Anatomic and Molecular Development of Corticostriatal Projection Neurons in Mice

    PubMed Central

    Sohur, U. Shivraj; Padmanabhan, Hari K.; Kotchetkov, Ivan S.; Menezes, Joao R.L.; Macklis, Jeffrey D.

    2014-01-01

    Corticostriatal projection neurons (CStrPN) project from the neocortex to ipsilateral and contralateral striata to control and coordinate motor programs and movement. They are clinically important as the predominant cortical population that degenerates in Huntington's disease and corticobasal ganglionic degeneration, and their injury contributes to multiple forms of cerebral palsy. Together with their well-studied functions in motor control, these clinical connections make them a functionally, behaviorally, and clinically important population of neocortical neurons. Little is known about their development. “Intratelencephalic” CStrPN (CStrPNi), projecting to the contralateral striatum, with their axons fully within the telencephalon (intratelencephalic), are a major population of CStrPN. CStrPNi are of particular interest developmentally because they share hodological and axon guidance characteristics of both callosal projection neurons (CPN) and corticofugal projection neurons (CFuPN); CStrPNi send axons contralaterally before descending into the contralateral striatum. The relationship of CStrPNi development to that of broader CPN and CFuPN populations remains unclear; evidence suggests that CStrPNi might be evolutionary “hybrids” between CFuPN and deep layer CPN—in a sense “chimeric” with both callosal and corticofugal features. Here, we investigated the development of CStrPNi in mice—their birth, maturation, projections, and expression of molecular developmental controls over projection neuron subtype identity. PMID:23118198

  18. Magnetohydrodynamic projects at the CDIF (Component Development and Integration Facility)

    SciTech Connect

    Not Available

    1990-01-01

    This quarterly technical progress report presents the tasks accomplished at the Component Development and Integration Facility during the fourth quarter of FY90. Areas of technical progress this quarter included: coal system development; seed system development; test bay modification; channel power dissipation and distribution system development; oxygen system storage upgrade; iron core magnet thermal protection system oxygen checkout; TRW slag rejector/CDIF slag removal project; stack gas/environmental compliance upgrade; coal-fired combustor support; 1A channels fabrication and assembly; support of Mississippi State University diagnostic testing; test operations and results; data enhancement; data analysis and modeling; technical papers; and projected activities. 2 tabs.

  19. NASA redox storage system development project

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The operating temperature was raised from 25 C to 65 C, which enhanced the kinetics of the chromium electrode charging reactions. The design of the auxiliary electrochemical cell, which is used to keep both reactants at the same state of charge, was modified, leading to better and more stable performance. Preliminary testing has shown that the four tank mode of operation improves energy efficiency as much as 5 percentage points over the conventional two tank mode. Another variation in operating mode, the use of mixed reactants, potentially offers several very attractive advantages. Preliminary reactant cost studies lend further weight to the feasibility of the mixed reactant concept. Electrode studies show that reproducibility of performance is very dependent on the pyrolysis temperature at which the carbon/graphite felt substrate is formed. Membrane development work continued to concentrate on cost reduction and the enhancement of resistivity and selectivity.

  20. Thermal Protection Test Bed Pathfinder Development Project

    NASA Technical Reports Server (NTRS)

    Snapp, Cooper

    2015-01-01

    In order to increase thermal protection capabilities for future reentry vehicles, a method to obtain relevant test data is required. Although arc jet testing can be used to obtain some data on materials, the best method to obtain these data is to actually expose them to an atmospheric reentry. The overprediction of the Orion EFT-1 flight data is an example of how the ground test to flight traceability is not fully understood. The RED-Data small reentry capsule developed by Terminal Velocity Aerospace is critical to understanding this traceability. In order to begin to utilize this technology, ES3 needs to be ready to build and integrate heat shields onto the RED-Data vehicle. Using a heritage Shuttle tile material for the heat shield will both allow valuable insight into the environment that the RED-Data vehicle can provide and give ES3 the knowledge and capability to build and integrate future heat shields for this vehicle.

  1. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2011-01-01

    The now-cancelled Constellation Program included the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, were planned to be manned space vehicles while the third element was much more diverse and included several sub-elements. Among other things, these sub-elements were Rovers and a Lunar Habitat. The planned missions involving these systems and vehicles included several risks and design challenges. Due to the unique thermal operating environment, many of these risks and challenges were associated with the vehicles thermal control system. NASA s Exploration Technology Development Program (ETDP) consisted of various technology development projects. The project chartered with mitigating the aforementioned thermal risks and design challenges was the Thermal Control System Development for Exploration Project. These risks and design challenges were being addressed through a rigorous technology development process that was planned to culminate with an integrated thermal control system test. Although the technologies being developed were originally aimed towards mitigating specific Constellation risks, the technology development process is being continued within a new program. This continued effort is justified by the fact that many of the technologies are generically applicable to future spacecraft thermal control systems. The current paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing a material compatibility assessment for a promising thermal control system working fluid. The to-date progress and lessons-learned from these development efforts will be discussed throughout the paper.

  2. Small Payload Integration and Testing Project Development

    NASA Technical Reports Server (NTRS)

    Sorenson, Tait R.

    2014-01-01

    The National Aeronautics and Space Administration's (NASA) Kennedy Space Center (KSC) has mainly focused on large payloads for space flight beginning with the Apollo program to the assembly and resupply of the International Space Station using the Space Shuttle. NASA KSC is currently working on contracting manned Low Earth Orbit (LEO) to commercial providers, developing Space Launch System, the Orion program, deep space manned programs which could reach Mars, and providing technical expertise for the Launch Services Program for science mission payloads/satellites. KSC has always supported secondary payloads and smaller satellites as the launch provider; however, they are beginning to take a more active role in integrating and testing secondary payloads into future flight opportunities. A new line of business, the Small Payload Integration and Testing Services (SPLITS), has been established to provide a one stop shop that can integrate and test payloads. SPLITS will assist high schools, universities, companies and consortiums interested in testing or launching small payloads. The goal of SPLITS is to simplify and facilitate access to KSC's expertise and capabilities for small payloads integration and testing and to help grow the space industry. An effort exists at Kennedy Space Center to improve the external KSC website. External services has partnered with SPLITS as a content test bed for attracting prospective customers. SPLITS is an emerging effort that coincides with the relaunch of the website and has a goal of attracting external partnerships. This website will be a "front door" access point for all potential partners as it will contain an overview of KSC's services, expertise and includes the pertinent contact information.

  3. Advanced Gas Turbine (AGT) Technology Development Project annual report

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This report is the tenth in a series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Carborundum Company, and AiResearch Casting Company. The Project is administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report covers plans and progress for the period July 1, 1984 through June 30, 1985.

  4. The Development of Success Criteria for Educational Research and Development Projects.

    ERIC Educational Resources Information Center

    Ball, Rodney J.; Cook, Desmond L.

    The purpose of this study was to determine the relative importance of six criteria of project success and to develop a composite criterion of educational project success. Criteria considered were schedule, cost, quality/performance, follow-onwork, spin-of benefits, customer/client satisfaction, and overall project success. Two hundred and six…

  5. The Start-Up Phase in a Research and Development Work Project: A Foundation for Development

    ERIC Educational Resources Information Center

    Postholm, May Britt

    2008-01-01

    The article is based on a research and development work project (R&D project) conducted in a Norwegian lower secondary school. The purpose of the text is to describe the researchers' and teachers' roles during the initial phase of such a project, and what this phase and the close cooperation between the researcher and teachers mean for the…

  6. Developing an effective diving program for a hydro maintenance project

    SciTech Connect

    Stasch, E.

    1997-08-01

    A trash problem at the Fort Randall hydropower project threatened to affect operations and cause potential machinery damage. When traditional approaches to clean away the trash were judged unfeasible, US Army Corps of Engineers managers developed a combined mechanical cleanup and underwater diving program. A contractor successfully removed 500 tons of debris at a cost of about $302,000. The dive plan and problems experienced during the project are detailed in the article.

  7. Flat-plate solar array project. Volume 5: Process development

    NASA Technical Reports Server (NTRS)

    Gallagher, B.; Alexander, P.; Burger, D.

    1986-01-01

    The goal of the Process Development Area, as part of the Flat-Plate Solar Array (FSA) Project, was to develop and demonstrate solar cell fabrication and module assembly process technologies required to meet the cost, lifetime, production capacity, and performance goals of the FSA Project. R&D efforts expended by Government, Industry, and Universities in developing processes capable of meeting the projects goals during volume production conditions are summarized. The cost goals allocated for processing were demonstrated by small volume quantities that were extrapolated by cost analysis to large volume production. To provide proper focus and coverage of the process development effort, four separate technology sections are discussed: surface preparation, junction formation, metallization, and module assembly.

  8. Selected nursery projects at the Missoula Technology and Development Center

    Treesearch

    Brian Vachowski

    2007-01-01

    The USDA Forest Service Missoula Technology and Development Center (MTDC) offers technical expertise, technology transfer, and new equipment development to federal, state, and private forest nurseries. Current and recently completed projects at MTDC include a container block steam sterilizer, shielded herbicide sprayer, time-domain reflectometry (TDR) nursery soil...

  9. Industrial Arts Leadership Development Project, 1977-78. Final Report.

    ERIC Educational Resources Information Center

    Montclair State Coll., Upper Montclair, NJ.

    The Industrial Arts Leadership Development Project was conducted to (1) provide inservice training for teachers to improve the quality of instruction and supervision; (2) provide inservice training for minorities and persons with limited English capability; and (3) provide leadership development for inservice teachers, service staff, and…

  10. [Wisconsin] Research and Development Project in Career Education: Final Report.

    ERIC Educational Resources Information Center

    Lehrmann, Eugene I.

    The K-Adult research and development project in career education in Eau Claire, Wisconsin, contained two phases: (1) Eau Claire Joint School District Five, introducing the 16 Wisconsin career development concepts into school curricula through teacher workshops, resource materials, public relations, and consulting services for classroom teachers…

  11. International Computer Conferencing for Professional Development: The Bangkok Project.

    ERIC Educational Resources Information Center

    Anderson, Terry; Mason, Robin

    1993-01-01

    Describes the Bangkok Project, a successful application of electronic mail and computer conferencing networks to support professional development in the field of distance education. The development of the computer conference to supplement a face-to-face conference in Bangkok is explained, and conference format and nature of interactions are…

  12. The Comprehensive Social Studies Assessment Project (CSSAP) Professional Development Manual.

    ERIC Educational Resources Information Center

    Missouri State Dept. of Elementary and Secondary Education, Jefferson City.

    The purpose of this professional development manual is to provide materials and activities for developing and using assessments in social studies. The manual came about through the efforts of the 25 state consortium Comprehensive Social Studies Assessment Project (CSSAP) to make the alignment of assessments, curricula, and instructional programs…

  13. The Port of Baltimore Workplace Skills Development Project. Performance Report.

    ERIC Educational Resources Information Center

    Amarantides, Niki; Blumner, Ellen

    The Port of Baltimore Workplace Skills Development Project had the following objectives: perform literacy audits on at least 20 job titles within the port-related industries; develop curriculum modules providing literacy skill instruction using a functional context approach reflecting the Port of Baltimore needs; offer instructional services to at…

  14. Effective Communication. The Port of Baltimore Workplace Skills Development Project.

    ERIC Educational Resources Information Center

    Blumner, Ellen

    This set of learning modules was developed during a project to deliver workplace literacy instruction to individuals employed in the more than 50 businesses related to the activities of the Port of Baltimore. It is intended to help office staff of port businesses develop basic interpersonal communication and time and stress management skills. The…

  15. Effective Communication. The Port of Baltimore Workplace Skills Development Project.

    ERIC Educational Resources Information Center

    Blumner, Ellen

    This set of learning modules was developed during a project to deliver workplace literacy instruction to individuals employed in the more than 50 businesses related to the activities of the Port of Baltimore. It is intended to help office staff of port businesses develop basic interpersonal communication and time and stress management skills. The…

  16. 2+2 Electronics. A Model Program Development Project.

    ERIC Educational Resources Information Center

    Smith, Jack; And Others

    This document contains materials and information used during and developed by a model 2+2 electronics technology program development project conducted by Gainesville High School and Cooke County College, Texas. A procedures manual provides information on grant application, surveys, committees, curricula, articulation agreement, and goals and…

  17. Rapid Response Risk Assessment in New Project Development

    NASA Technical Reports Server (NTRS)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  18. Rapid Response Risk Assessment in New Project Development

    NASA Technical Reports Server (NTRS)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  19. Research, design & development project Myoelectric Prosthesis of Upper Limb

    NASA Astrophysics Data System (ADS)

    Galiano, L.; Montaner, E.; Flecha, A.

    2007-11-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  20. The SIMRAND methodology - Simulation of Research and Development Projects

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  1. Clean development mechanism: an incentive for waste management projects?

    PubMed

    Plöchl, Clemens; Wetzer, Wolfgang; Ragossnig, Arne

    2008-02-01

    The Clean Development Mechanism (CDM) was introduced by the Kyoto Protocol to provide a financial incentive to establish project activities in developing countries for reducing greenhouse gas emissions while also fostering sustainable development. This article shows that waste management project activities play an important role in achieving the aims of the CDM. It describes how these activities have to prove additionality, how the emission reductions must be calculated and monitored in order to be eligible and in order to lead to Certified Emission Reductions (CERs). The article further provides an analysis about the various challenges that are involved in applying the CDM scheme to waste management project activities, which require a new specific set of technical skills and regulatory standards.

  2. The SIMRAND methodology - Simulation of Research and Development Projects

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  3. Recent developments from ICSWSE/MAGDAS Research Project

    NASA Astrophysics Data System (ADS)

    Yoshikawa, A.; Yumoto, K.; Kawano, H.; Abe, S.; Uozumi, T.; Cardinal, C.; Maeda, G.

    2014-12-01

    International Center for Space Weather Science and Education (ICSWSE) has developed a real time magnetic data acquisition system (the MAGDAS Project) for space environment monitoring around the world. The number of observational sites is increasing every year with the collaboration of MAGDAS hosts in several countries. At this time, the MAGDAS Project has installed 73 real time magnetometers - so it is the largest magnetometer array in the world maintained and operated by one organization. Using this global observational network, we are conducting the following research projects: (1) Global electromagnetic coupling from polar to equatorial ionosphere (2) Vertical coupling between atmosphere, ionosphere and magnetosphere (3) Plasmaspheric diagnosis using Field line resonance (4) Magnetospheric diagnosis using geomagnetic disturbances (5) Monitoring of space weather phenomena using indices (6) Sun-Atmosphere coupling In this talk, we will introduce some of our interesting results obtained from the aforementioned research projects.

  4. Communication challenges in system development: involvement of system developers in small-scale IT projects.

    PubMed

    Petersen, Lone Stub; Bjoernes, Charlotte D; Bertelsen, Pernille

    2010-01-01

    A well-known challenge in system development is the aspect of user participation. In this paper we shift perspective from how to involve users in system development to how project managers with a clinical background, but without technical system knowledge, can involve system developers in IT projects. Using data from the development of an online patient book (an ICT application for clinical practice), we analyze challenges using the concept of language-games. We conclude that further research and development of participatory and communicative methods to involve system developers in IT projects, based in a clinical context, is needed.

  5. NASA Advanced Refrigerator/Freezer Technology Development Project Overview

    NASA Technical Reports Server (NTRS)

    Cairelli, J. E.

    1995-01-01

    NASA Lewis Research Center (LeRC) has recently initiated a three-year project to develop the advanced refrigerator/freezer (R/F) technologies needed to support future life and biomedical sciences space experiments. Refrigerator/freezer laboratory equipment, most of which needs to be developed, is enabling to about 75 percent of the planned space station life and biomedical science experiments. These experiments will require five different classes of equipment; three storage freezers operating at -20 C, -70 C and less than 183 C, a -70 C freeze-dryer, and a cryogenic (less than 183 C) quick/snap freezer. This project is in response to a survey of cooling system technologies, performed by a team of NASA scientists and engineers. The team found that the technologies, required for future R/F systems to support life and biomedical sciences spaceflight experiments, do not exist at an adequate state of development and concluded that a program to develop the advanced R/F technologies is needed. Limitations on spaceflight system size, mass, and power consumption present a significant challenge in developing these systems. This paper presents some background and a description of the Advanced R/F Technology Development Project, project approach and schedule, general description of the R/F systems, and a review of the major R/F equipment requirements.

  6. Information systems design for development projects in Central America.

    PubMed

    Ramiro Montealegre, J

    1991-06-01

    Present development projects in Central America, particularly food aid and food and nutrition education programs, are operating under severe management constraints which limit their potential to produce positive and measurable impacts on target communities and families. Thus, operational analysis and information systems are basic managerial tools to improve the efficiency of the projects. This paper presents an information system development methodology which has been used by the Institute of Nutrition of Central America and Panama (INCAP) to assist different development projects of Central America. The methodology is geared on the one hand, towards systematizing the definition of the demand and of applications and, on the other, of the types of response required or deemed convenient, taking into account the technologies that are appropriate to the users' various capacities. The complete development cycle is based on good understanding of the social, organizational and human aspects of the project. Through the whole process, not only is the information system being developed and documented, but personnel is being trained and assisted in solving their problems, contributing thereby, to true transfer of technology. No new set of techniques of systems development is presented. What has been done is to carefully select elements of current technical practices, modifying tools and techniques to generate a unique methodology through which the information systems' requirements, specifications, and details may be expressed.

  7. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    SciTech Connect

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production

  8. Sustainable Energy in Remote Indonesian Grids. Accelerating Project Development

    SciTech Connect

    Hirsch, Brian; Burman, Kari; Davidson, Carolyn; Elchinger, Michael; Hardison, R.; Karsiwulan, D.; Castermans, B.

    2015-06-30

    Sustainable Energy for Remote Indonesian Grids (SERIG) is a U.S. Department of Energy (DOE) funded initiative to support Indonesia’s efforts to develop clean energy and increase access to electricity in remote locations throughout the country. With DOE support, the SERIG implementation team consists of the National Renewable Energy Laboratory (NREL) and Winrock International’s Jakarta, Indonesia office. Through technical assistance that includes techno-economic feasibility evaluation for selected projects, government-to-government coordination, infrastructure assessment, stakeholder outreach, and policy analysis, SERIG seeks to provide opportunities for individual project development and a collective framework for national replication office.

  9. Introduction to SIMRAND: Simulation of research and development project

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1982-01-01

    SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.

  10. Video Usage in Career Development Project. Producer's Report [and] Descriptions of 98 Reviewed Career Development Videos.

    ERIC Educational Resources Information Center

    Feller, Rich

    This report describes a project to explore video technology as a tool for career competency achievement. It discusses the following project outcomes: evaluation of 98 videotapes by 398 counselors in 20 national workshops, based on the National Career Development Guidelines (NCDG); counselor training in the use of videos for career development;…

  11. [Future development of radioecological investigations--new international projects].

    PubMed

    Sanzharova, N I

    2014-01-01

    Information is given on the future development of nuclear power engineering and the need to ensure environmental safety. The complexity of the emerging problems requires a wide international integration of scientific investigations. Also described are ecological projects that have been implemented by the IAER after the Chernobyl NPP accident, as well as a new project, MODARIA, which will pay special attention to the improvement of models for radionuclide transfer and estimation of radiation effects on both humans and biota. The strategy and agenda for the development of radioecological studies in the 21st century are described which are being realized by the nine key research centers (European Radioecology Alliance) under the EC project STAR.

  12. The Family Medicine Curriculum Resource Project: implications for faculty development.

    PubMed

    Sheets, Kent J; Quirk, Mark E; Davis, Ardis K

    2007-01-01

    Faculty development implications related to implementing the Family Medicine Curriculum Resource (FMCR) Project provide an opportunity to look at the recommendations of the Society of Teachers of Family Medicine's federally funded Faculty Futures Initiative (FFI) and the recent Future of Family Medicine (FFM) project. Implications for faculty development include the importance of the clerkship setting, originally defined in 1991, with new features added in today's practice environment as outlined by the FFM and the changing assumptions in approaching faculty development. Previously, faculty development focused on teaching learners to master current knowledge. Now, faculty must teach learners how to master new competencies throughout their lives; learners need to learn how they and others learn now. Teaching must focus on how to learn in the future as well as what to learn for the present. Competence ("what individuals know or are able to do in terms of knowledge, skills, and attitudes") has become the focus of curriculum development efforts over the last few years and most appropriately serves as the focus of curriculum development in the FMCR Project. Implications for developing teachers and preceptors focus on the skills and circumstances required to teach and evaluate all types (cognitive, metacognitive, and affective) of competence. In the new culture, novel teaching methods will serve as the focus of faculty development in teaching and of educational ("best practices") research.

  13. Project Morpheus: Lessons Learned in Lander Technology Development

    NASA Technical Reports Server (NTRS)

    Olansen, Jon B.; Munday, Stephen R.; Mitchell, Jennifer D.

    2013-01-01

    NASA's Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing, that is designed to serve as a testbed for advanced spacecraft technologies. The lander vehicle, propelled by a LOX/Methane engine and sized to carry a 500kg payload to the lunar surface, provides a platform for bringing technologies from the laboratory into an integrated flight system at relatively low cost. Designed, developed, manufactured and operated in-house by engineers at Johnson Space Center, the initial flight test campaign began on-site at JSC less than one year after project start. After two years of testing, including two major upgrade periods, and recovery from a test crash that caused the loss of a vehicle, flight testing will evolve to executing autonomous flights simulating a 500m lunar approach trajectory, hazard avoidance maneuvers, and precision landing, incorporating the Autonomous Landing and Hazard Avoidance (ALHAT) sensor suite. These free-flights are conducted at a simulated planetary landscape built at Kennedy Space Center's Shuttle Landing Facility. The Morpheus Project represents a departure from recent NASA programs and projects that traditionally require longer development lifecycles and testing at remote, dedicated testing facilities. This paper expands on the project perspective that technologies offer promise, but capabilities offer solutions. It documents the integrated testing campaign, the infrastructure and testing facilities, and the technologies being evaluated in this testbed. The paper also describes the fast pace of the project, rapid prototyping, frequent testing, and lessons learned during this departure from the traditional engineering development process at NASA's Johnson Space Center.

  14. Materials Development Program: Ceramic Technology Project bibliography, 1984--1992

    SciTech Connect

    Not Available

    1994-03-01

    The Ceramic Technology [for Advanced Heat Engines] Project was begun in 1983 to meet the ceramic materials needs of the companion DOE automotive engine program, the Advanced Gas Turbine (AGT) project, and the Heavy Duty Transport (low-heat-rejection, heavy-duty diesel) project. Goal is to develop an industry technology base for reliable and cost effective ceramics for applications in advanced automotive gas turbine and diesel engines. Research areas were identified following extensive input from industry and academia. Majority of research is done by industry (60%); work is also done at colleges and universities, in-house, and at other national laboratories and government agencies. In the beginning, reliability of ceramic components was the key issue. The reliability issues have largely been met and, at the present time, cost is the driving issue, especially in light of the highly cost-sensitive automotive market. Emphasis of the program has now been shifted toward developing cost-effective ceramic components for high-performance engines in the near-term. This bibliography is a compilation of publications done in conjunction with the Ceramic Technology Project since its beginning. Citations were obtained from reports done by participants in the project. We have tried to limit citations to those published and easily located. The end date of 1992 was selected.

  15. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  16. International Projects Development: From Decision Cycle to Overseas Reality.

    ERIC Educational Resources Information Center

    Franklyn, Gaston J.

    The major elements of the industry-based planning process can be successfully applied to the development and implementation of international projects in educational institutions. International education programs share the following fundamental structural elements with business and industry: they compete in the market place, and exist by managing…

  17. MISSOURI ADULT VOCATIONAL-LITERACY MATERIALS DEVELOPMENT PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    HEDING, HOWARD W.; AND OTHERS

    IN THE MISSOURI ADULT VOCATIONAL-LITERACY MATERIALS DEVELOPMENT PROJECT MATERIALS WERE DEVISED FOR TEACHING ADULTS TO READ, WRITE, AND SPELL AT THE FUNCTIONAL (SIXTH GRADE) LEVEL. IN THE RESEARCH PHASE, THE NEEDS, CHARACTERISTICS, LITERACY LEVEL, OCCUPATIONS, AND INTERESTS OF THE ILLITERATE ADULT WERE STUDIED, AND TEACHING MATERIALS AND METHODS…

  18. Identifying, Measuring and Monitoring Value during Project Development

    ERIC Educational Resources Information Center

    Kliniotou, Maria

    2004-01-01

    This paper describes the findings of the research done by Loughborough University in conjunction with ten construction industry collaborators in an attempt to identify what construction professionals mean by value. The aim of the research is to establish a common approach to identify value in projects and to monitor its development throughout the…

  19. Active nursery projects at the Missoula Technology and Development Center

    Treesearch

    Brian Vachowski

    2005-01-01

    The USDA Forest Service Missoula Technology and Development Center (MTDC) provides technical expertise, new equipment prototypes, and technology transfer services to Federal, State, and cooperator forest tree seedling nursery managers. Current projects at MTDC include a nursery soil moisture meter, remote data collection systems, low cost weather stations, soil...

  20. Career Development Project for Incarcerated Youth: Preparing for the Future

    ERIC Educational Resources Information Center

    Moody, Barbara; Kruse, Gordon; Nagel, Jeffrey; Conlon, Bill

    2008-01-01

    This qualitative study examined student perceptions of the Career Development curriculum used at Robert Farrell School. Students at Robert Farrell School are required to complete a career project to fulfill the Oregon State requirement that students demonstrate career skills to earn a high school diploma. There is substantial evidence indicating…

  1. Developing and Evaluating a Cardiovascular Risk Reduction Project.

    ERIC Educational Resources Information Center

    Brownson, Ross C.; Mayer, Jeffrey P.; Dusseault, Patricia; Dabney, Sue; Wright, Kathleen; Jackson-Thompson, Jeannette; Malone, Bernard; Goodman, Robert

    1997-01-01

    Describes the development and baseline evaluation data from the Ozark Heart Health Project, a community-based cardiovascular disease risk reduction program in rural Missouri that targeted smoking, physical inactivity, and poor diet. Several Ozark counties participated in either intervention or control groups, and researchers conducted surveillance…

  2. Solicitation - Geothermal Drilling Development and Well Maintenance Projects

    SciTech Connect

    Sattler, A.R.

    1999-07-07

    Energy (DOE)-industry research and development (R and D) organization, sponsors near-term technology development projects for reducing geothermal drilling and well maintenance costs. Sandia National Laboratories (Albuquerque, NM) administers DOE funds for GDO cost-shared projects and provides technical support. The GDO serves a very important function in fostering geothermal development. It encourages commercialization of emerging, cost-reducing drilling technologies, while fostering a spirit of cooperation among various segments of the geothermal industry. For Sandia, the GDO also serves as a means of identifying the geothermal industry's drilling fuel/or well maintenance problems, and provides an important forum for technology transfer. Successfully completed GDO projects include: the development of a high-temperature borehole televiewer, high-temperature rotating head rubbers, a retrievable whipstock, and a high-temperature/high-pressure valve-changing tool. Ongoing GDO projects include technology for stemming lost circulation; foam cement integrity log interpretation, insulated drill pipe, percussive mud hammers for geothermal drilling, a high-temperature/ high-pressure valve changing tool assembly (adding a milling capability), deformed casing remediation, high- temperature steering tools, diagnostic instrumentation for casing in geothermal wells, and elastomeric casing protectors.

  3. A Coordinated Decentralized Approach to Online Project Development

    ERIC Educational Resources Information Center

    Mykota, David

    2013-01-01

    With the growth rate of online learning outpacing traditional face-to-face instruction, universities are beginning to recognize the importance of strategic planning in its development. Making the case for online learning requires sound project management practices and an understanding of the business models on which it is predicated. The objective…

  4. Handle with CARE: A Site-Based Character Development Project.

    ERIC Educational Resources Information Center

    Theel, Ronald K.

    Van Duyn Elementary School (Syracuse, New York) implemented a site-based project to develop student character. The neighborhood is a racially mixed, stable, private home community with 58 percent of students eligible for free or reduced price lunches. The school's objectives as part of a shared decision making, pilot school process were to have…

  5. Current Status of the Physics Computer Development Project.

    ERIC Educational Resources Information Center

    Bork, Alfred

    With support from the National Science Foundation and the University of California, the Physics Computer Development Project have produced in the last six years computer based material in a wide variety of modes. Among the major products are science learning dialogs, graphic additions to APL (A Programming Language), the underlying software, and…

  6. Teacher Development Program for ATP 2000. Project Report.

    ERIC Educational Resources Information Center

    Sutphin, Dean; And Others

    Agri Tech Prep 2000 (ATP 2000) is a 4-year tech prep program linking high school and postsecondary curricula designed to prepare New York students for careers in agriculture or acceptance into a college program in agriculture. Because teacher development was designated an integral project component for fiscal year 1991-1992, a weeklong teacher…

  7. Impact of Personal Growth Projects on Leadership Identity Development

    ERIC Educational Resources Information Center

    Odom, Summer F.; Boyd, Barry L.; Williams, Jennifer

    2012-01-01

    Within personal leadership education courses, leadership educators should include experiences which help students develop themselves as leaders. In this article, the authors discuss results from a qualitative research study involving the analysis of Personal Growth Project (PGP) assignments in a personal leadership education collegiate course. The…

  8. Developing and Evaluating a Cardiovascular Risk Reduction Project.

    ERIC Educational Resources Information Center

    Brownson, Ross C.; Mayer, Jeffrey P.; Dusseault, Patricia; Dabney, Sue; Wright, Kathleen; Jackson-Thompson, Jeannette; Malone, Bernard; Goodman, Robert

    1997-01-01

    Describes the development and baseline evaluation data from the Ozark Heart Health Project, a community-based cardiovascular disease risk reduction program in rural Missouri that targeted smoking, physical inactivity, and poor diet. Several Ozark counties participated in either intervention or control groups, and researchers conducted surveillance…

  9. Managerial Skills in Vocational Education Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Clayton, Dean; Park, Ok

    A project was conducted to develop, field test, and disseminate a curriculum guide for vocational education teachers to use in teaching managerial skills to vocational education students on the secondary level. After a cadre of 20 Arkansas secondary vocational education teachers who were either directly involved or interested in establishing a…

  10. Identifying, Measuring and Monitoring Value during Project Development

    ERIC Educational Resources Information Center

    Kliniotou, Maria

    2004-01-01

    This paper describes the findings of the research done by Loughborough University in conjunction with ten construction industry collaborators in an attempt to identify what construction professionals mean by value. The aim of the research is to establish a common approach to identify value in projects and to monitor its development throughout the…

  11. The YouthARTS Development Project. Juvenile Justice Bulletin.

    ERIC Educational Resources Information Center

    Clawson, Heather J.; Coolbaugh, Kathleen

    The arts enrich the culture and individual lives immeasurably, but what impact do arts-based programs have in preventing juvenile delinquency? To address this question, the YouthARTS Development Project, with the technical assistance of the Office of Juvenile Justice and Delinquency Prevention (OJJDP), brought together Federal agencies, national…

  12. Developing a CWIS--It's Not a Computing Center Project.

    ERIC Educational Resources Information Center

    Smith, Carol L.; Nealon, Bonnie M.

    In December 1994, DePauw University (Greencastle, Indiana) began developing plans for creating its World Wide Web-based campus wide information system (CWIS), DePauwINFO. Thirteen team members were recruited whose interests were intentionally diverse to ensure a broad representation of the entire campus community. A project timeline was proposed…

  13. Supporting Moral Development: The Virtues Project[TM

    ERIC Educational Resources Information Center

    de Moor, Gerrit

    2011-01-01

    The Virtues Project[TM] was founded in Canada in 1991 by Linda Kavelin Popov, Dan Popov, and John Kavelin who were concerned about the level of violence among families and youth. In studying sacred traditions and cultures around the world, they identified a set of common virtues. These were used to develop a pedagogical model that has applications…

  14. Project 4-Health Develops Program to Curb Youth Tobacco Use.

    ERIC Educational Resources Information Center

    Braverman, Marc T.; And Others

    1994-01-01

    Describes the development of Project 4-Health, a California program that recruits and trains teenagers to deliver a tobacco education program to children ages 9-12. The program was based on studies involving the social context of tobacco use, a survey of 4-H members, and randomized field trials of the prevention curriculum. (LP)

  15. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  16. Supporting Moral Development: The Virtues Project[TM

    ERIC Educational Resources Information Center

    de Moor, Gerrit

    2011-01-01

    The Virtues Project[TM] was founded in Canada in 1991 by Linda Kavelin Popov, Dan Popov, and John Kavelin who were concerned about the level of violence among families and youth. In studying sacred traditions and cultures around the world, they identified a set of common virtues. These were used to develop a pedagogical model that has applications…

  17. Project-Based Management Development: "The Volvo Story."

    ERIC Educational Resources Information Center

    Branch, John; Smith, Bryan

    1992-01-01

    A modular group project-based approach to management development was implemented by Volvo Concessionaires (United Kingdom) in partnership with training consultants. Ingredients of its success included top-level commitment, investment in diagnosis and tailoring, and use of company-specific case studies. (SK)

  18. Making Online Professional Development Work for Florida Project Learning Tree

    ERIC Educational Resources Information Center

    McConnell, Lindsey C.; Monroe, Martha C.

    2012-01-01

    Large distances and small budgets had made it challenging for Florida Project Learning Tree (PLT) to conduct in-person workshops with volunteer 4-H leaders to disseminate the PreK-8 guide. An online version of a PLT workshop was developed to overcome these barriers. Formative evaluation data suggested that the program effectively introduced PLT to…

  19. Project Coach: Youth Development and Academic Achievement through Sport

    ERIC Educational Resources Information Center

    Intrator, Sam M.; Siegel, Donald

    2008-01-01

    Researchers and educators have long tried to find the connection between participation in sport-related activities and academic and social development among youths. This article traces the conceptual ideas that led to the design of an after-school sports program (Project Coach). This program promotes positive youth and community development…

  20. Collaborative Writing to Enhance Academic Writing Development through Project Work

    ERIC Educational Resources Information Center

    Robayo Lun, Alma Milena; Hernandez Ortiz, Luz Stella

    2013-01-01

    Advanced students at university level struggle with many aspects of academic writing in English as a foreign language. The purpose of this article is to report on an investigation aimed at analyzing what collaborative writing through project work tells us about students' academic writing development at the tertiary level. The compositions written…

  1. International Projects Development: From Decision Cycle to Overseas Reality.

    ERIC Educational Resources Information Center

    Franklyn, Gaston J.

    The major elements of the industry-based planning process can be successfully applied to the development and implementation of international projects in educational institutions. International education programs share the following fundamental structural elements with business and industry: they compete in the market place, and exist by managing…

  2. Project Coach: Youth Development and Academic Achievement through Sport

    ERIC Educational Resources Information Center

    Intrator, Sam M.; Siegel, Donald

    2008-01-01

    Researchers and educators have long tried to find the connection between participation in sport-related activities and academic and social development among youths. This article traces the conceptual ideas that led to the design of an after-school sports program (Project Coach). This program promotes positive youth and community development…

  3. The Maryland Career Development Project--Phase I. Final Report.

    ERIC Educational Resources Information Center

    Mietus, Walter S.; Stilling, Chris

    This first phase of an exemplary career development project in Maryland included the following seven action programs, each with general and specific goals and objectives: (1) a team approach at selected junior high schools involving counselors, home economics, and industrial arts teachers, (2) use of a full-time resource consultant in five…

  4. World Geography. The Port of Baltimore Workplace Skills Development Project.

    ERIC Educational Resources Information Center

    Walker, Sam

    This set of learning modules was developed during a project to deliver workplace literacy instruction to individuals employed in the more than 50 businesses related to the activities of the Port of Baltimore. It is intended to accomplish the following objectives: familiarize students with basic concepts of geography; give students knowledge of…

  5. Course Design and Teacher Development in Vietnam: A Diary Project

    ERIC Educational Resources Information Center

    Baurain, Bradley

    2010-01-01

    In this article, the author talks about a diary project that arose from a situation that was both an opportunity and a challenge. While teaching in Vietnam in the spring of 2004, the author received an invitation from the national university in Hanoi. The letter asked him to teach there and specifically to develop a postgraduate course called…

  6. Impact Evaluation of National Writing Project Professional Development Program

    ERIC Educational Resources Information Center

    Gallagher, H. Alix; Woodworth, Katrina; McCaffrey, Teresa; Park, Christina J.; Wang, Haiwen

    2014-01-01

    Improving teacher effectiveness is a key strategy to ensure student readiness for college and careers and to address achievement gaps and persistent low performance. In response to the new Common Core State Standards for English Language Arts (CCSS-ELA) the National Writing Project (NWP) created a professional development (PD) program to support…

  7. Project PROF: A Professional Development Program for College Faculty.

    ERIC Educational Resources Information Center

    Cooper, Colleen R.

    Project PROF, a professional development program for experienced teaching faculty in the College of Agriculture and Natural Resources at Michigan State University, is described, and results of a faculty assessment of the program are summarized. Program objectives include: increased faculty self-assessment as related to teaching; expose faculty to…

  8. Accessing Curriculum Through Technology Tools (ACTTT): A Model Development Project

    ERIC Educational Resources Information Center

    Daytner, Katrina M.; Johanson, Joyce; Clark, Letha; Robinson, Linda

    2012-01-01

    Accessing Curriculum Through Technology Tools (ACTTT), a project funded by the U.S. Office of Special Education Programs (OSEP), developed and tested a model designed to allow children in early elementary school, including those "at risk" and with disabilities, to better access, participate in, and benefit from the general curriculum.…

  9. Developing Learner Autonomy through Project Work in an ESP Class

    ERIC Educational Resources Information Center

    Díaz Ramírez, Martha Isabel

    2014-01-01

    This article presents the findings of an action research study on developing learner autonomy through project work in an English for Specific Purposes class. The study was conducted at a Colombian regional and public university with environmental engineering undergraduates. The instruments for data collection were field notes, semi-structured…

  10. Project-based faculty development for e-learning.

    PubMed

    Vyas, Rashmi; Faith, Minnie; Selvakumar, Dhayakani; Pulimood, Anna; Lee, Mary

    2016-12-01

    The Christian Medical College, Vellore, in collaboration with Tufts University, Boston, conducted an advanced workshop in e-learning for medical faculty members in India. E-learning can enhance educational reforms for today's computer-literate generation, and keep faculty members up to speed in a rapidly changing world. The purpose of this paper is to report on the design and evaluation of a project-based faculty member development programme focused on developing faculty members as educators and as peer trainers who can use e-learning for educational reforms. During a 2-day workshop, 29 participants in groups of two or three developed 13 e-learning projects for implementation in their institutions. Evaluation of the workshop was through written feedback from the participants at the end of the workshop and by telephone interview with one participant from each project group at the end of one year. Content analysis of qualitative data was perfomed. The participants reported that they were motivated to implement e-learning projects and recognised the need for and usefulness of e-learning. The majority of projects (10 out of 13) that were implemented 'to some extent' or 'to a great extent' faced challenges with a lack of resources and administrative support, but faculty members were able to overcome them. E-learning can enhance educational reforms for today's computer-literate generation IMPLICATIONS: Designing feasible e-learning projects in small groups and obtaining hands-on experience with e-learning tools enhance the effectiveness of subsequent implementation. To successfully incorporate e-learning when designing educational reforms, faculty member training, continuing support and infrastructure facilities are essential. © 2016 John Wiley & Sons Ltd.

  11. YES Africa: Geoscience Projects for Development (GPD) (Strategy and Process)

    NASA Astrophysics Data System (ADS)

    Barich, A.; Nkhonjera, E.; Venus, J.; Gonzales, L. M.

    2011-12-01

    For various reasons, Earth Science in Africa has been acareer path that has not been promoted or a preferred option. In January 2011, the YES Network in Africa launched the Network in Africa through a symposium. This took place at the University of Johannesburg, in conjunction with the Colloquium of Africa Geology in January 2011. The Symposium brought together young geoscientists from all regions of Africa to talk about their geoscience research that focused on geohazards and professional development within the African continent. The YES Africa Symposium also aimed to improve the participation of students in African geosciences issues and to also discuss how geoscience education in Africa can be promoted to attract more students to choose a career in the profession. The YES Africa Symposium resulted in ambitious short/long term projects. Symposium participants agreed unanimously that spreading awareness throughout the society about geological hazards, climate change, water management strategies and sustainable development remains a priority. As a direct result local projects are being developed by the YES Network's African National Chapters to develop a long-term geoscience taskforce within the continent. These projects will be developed by implementing student chapters in universities and strengthening the ties with local geoscience organizations and governments. Many YES Network African National Chapters have already taken the lead in developing their local projects, and some have been very successful in their efforts. Collaboration with the various YES Network National Chapters will be critical in developing a geo-hazard portal which links regional organizations and institutions together. This will help to disseminate geo-information more efficiently, and also to develop the next generation of young African geoscience students and early-career professionals. This presentation will detail a variety of innovative outreach methods used to connect with the public

  12. DOE-University of Arizona Faculty Development Project. Final report

    SciTech Connect

    Fillerup, Joseph M.

    1980-09-08

    The DOE-University of Arizona Faculty Development Project on Energy successfully completed a faculty development program. There were three phases of the program consisting of: a three week energy workshop for teachers, participation and cooperation with Students for Safe Energy in presentation of an Alternative Energy Festival at the University of Arizona, and workshops for teachers conducted at Flowing Wells School District. Each of these is described. Attendees are listed and a director's evaluation of the workshop is given.

  13. Environmental impacts of dispersed development from federal infrastructure projects.

    PubMed

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  14. The Mainsail Project: Developing Tools for Software Portability

    PubMed Central

    Wilcox, Clark R.

    1977-01-01

    The MAINSAIL project is part of the SUMEX Computer Project funded by the Biotechnology Resources Program, National Institutes of Health. Its basic goal is to provide a machine-independent programming system suitable for the development of large, portable programs. MAINSAIL is an ALGOL-like language with dynamic memory support for strings, arrays, records, modules and files. In this paper we give an overview of how portability is achieved, and of several approaches to code generation and execution. MAINSAIL, both a practical language and a research tool, provides a unique opportunity to evaluate alternative approaches to software portability.

  15. Managing environmental issues during international electric power project development

    SciTech Connect

    Cooper, H.W.

    1998-07-01

    Responsible international project developers most often view environmental matters with quite mixed emotions. Those with whom Dynalytics has worked would certainly never contemplate jeopardizing the health of anyone in the world. But while they want their projects realized, and are willing to implement reasonable requirements, they are often asked to do more than is appropriate, more than is technologically possible, and more than is financially possible. The paper discusses the following: who is in charge of environmental matters; whose environmental standards apply; the role of technology; accelerating timetables and reducing costs; documentation and applications; and post-construction requirements.

  16. Water development projects and marital violence: experiences from rural Bangladesh.

    PubMed

    Karim, K M Rabiul; Emmelin, Maria; Resurreccion, Bernadette P; Wamala, Sarah

    2012-01-01

    In this study, we explored the implications of a groundwater development project on women's workload and their experience of marital violence in a Bangladesh village. We believe that the project facilitated irrigation water but also that it resulted in seasonal domestic water shortages. Men used deep motorized pumps for irrigation, and women used shallow handpumps for domestic purposes. Many handpumps dried out, so women had to walk to distant wells. This increased their workload and challenged their possibilities of fulfilling household obligations, thereby increasing the risk of normative marital male violence against women as a punishment for their failure.

  17. Development of a laboratory information system for cancer collaboration projects.

    PubMed

    Quo, C F; Wu, B; Wang, M D

    2005-01-01

    Technological advances increase the rate and quality of biomedical data collection. To exploit these advances to the fullest, laboratory information management systems (LIMS) have been developed to integrate laboratory equipment with software controls so as to achieve an automated and seamless workflow process. Ultimately, researchers and clinicians must collaborate closely to achieve a comprehensive interpretation of heterogeneous biomedical data, especially with respect to clinical diagnosis and treatment. We present eOncoLIMS, a modular data and process management system designed to provide the infrastructure and environment for a collaborative cancer research project. This system can be further extended to other collaboration projects to achieve a complete solution to research and clinical problems.

  18. Design and management of development projects to avoid health hazards.

    PubMed

    Ackers, G L; Smith, D H

    1988-06-01

    By drawing from the examples of two dissimilar irrigation development projects it is concluded that for the success of a healthy land development project: (i) by deliberate design a suitable management organization must be set up which has the willing support of all the interested parties, which is given substance by statute and loan agreement, and which has the active support of government; (ii) the staffing should be headed by an enthusiastic person of high rank to provide historical continuity with an adequate secretariat to give effective technical and administrative support; (iii) a deterioration in health may actually threaten the continued existence of a development programme, and health services should be considered part of the development process and integrated with it at all stages from initial planning to several years after commissioning; (iv) health programmes should be responsive to the changing health needs of the settled populations which should be monitored to allow appropriate intervention and which must involve community participation; (v) although the operation of nationally accepted levels of health care facilities should be the responsibility of the national health authority, interventions attributable to the development should be part of the development cost; (vi) interventions should be based on pre-project epidemiology surveys and forecasts of its changes taking account of the disease experience of the settlement populations; (vii) to limit intervention to disease specific problems begs the basic issues. It should be possible to provide better cost-effective health facilities for populations of development projects than for their rural counterparts because they are better defined and more settled; (viii) such interventions by way of changes in fundamental design criteria for the primary engineering works are unlikely to be cost effective; (ix) adequate health facilities must be in place and capable of operation before settlement commences.

  19. Planned and ongoing projects (pop) database: development and results.

    PubMed

    Wild, Claudia; Erdös, Judit; Warmuth, Marisa; Hinterreiter, Gerda; Krämer, Peter; Chalon, Patrice

    2014-11-01

    The aim of this study was to present the development, structure and results of a database on planned and ongoing health technology assessment (HTA) projects (POP Database) in Europe. The POP Database (POP DB) was set up in an iterative process from a basic Excel sheet to a multifunctional electronic online database. The functionalities, such as the search terminology, the procedures to fill and update the database, the access rules to enter the database, as well as the maintenance roles, were defined in a multistep participatory feedback loop with EUnetHTA Partners. The POP Database has become an online database that hosts not only the titles and MeSH categorizations, but also some basic information on status and contact details about the listed projects of EUnetHTA Partners. Currently, it stores more than 1,200 planned, ongoing or recently published projects of forty-three EUnetHTA Partners from twenty-four countries. Because the POP Database aims to facilitate collaboration, it also provides a matching system to assist in identifying similar projects. Overall, more than 10 percent of the projects in the database are identical both in terms of pathology (indication or disease) and technology (drug, medical device, intervention). In addition, approximately 30 percent of the projects are similar, meaning that they have at least some overlap in content. Although the POP DB is successful concerning regular updates of most national HTA agencies within EUnetHTA, little is known about its actual effects on collaborations in Europe. Moreover, many non-nationally nominated HTA producing agencies neither have access to the POP DB nor can share their projects.

  20. Development and application of new quality model for software projects.

    PubMed

    Karnavel, K; Dillibabu, R

    2014-01-01

    The IT industry tries to employ a number of models to identify the defects in the construction of software projects. In this paper, we present COQUALMO and its limitations and aim to increase the quality without increasing the cost and time. The computation time, cost, and effort to predict the residual defects are very high; this was overcome by developing an appropriate new quality model named the software testing defect corrective model (STDCM). The STDCM was used to estimate the number of remaining residual defects in the software product; a few assumptions and the detailed steps of the STDCM are highlighted. The application of the STDCM is explored in software projects. The implementation of the model is validated using statistical inference, which shows there is a significant improvement in the quality of the software projects.

  1. Development and Application of New Quality Model for Software Projects

    PubMed Central

    Karnavel, K.; Dillibabu, R.

    2014-01-01

    The IT industry tries to employ a number of models to identify the defects in the construction of software projects. In this paper, we present COQUALMO and its limitations and aim to increase the quality without increasing the cost and time. The computation time, cost, and effort to predict the residual defects are very high; this was overcome by developing an appropriate new quality model named the software testing defect corrective model (STDCM). The STDCM was used to estimate the number of remaining residual defects in the software product; a few assumptions and the detailed steps of the STDCM are highlighted. The application of the STDCM is explored in software projects. The implementation of the model is validated using statistical inference, which shows there is a significant improvement in the quality of the software projects. PMID:25478594

  2. Teaching interested clinicians how to develop research projects.

    PubMed

    Wojtecki, Cindy A; Wade, Michael J; Pato, Michele T

    2007-01-01

    The authors discuss teaching clinicians about research by generating projects from clinical practice, expertise, and interest. Classes were co-taught by the hospital biostatistician and clinical nurse specialist in consultation with one of the authors. Hospital clinicians were taught how to initiate and design their study as a follow-up to a Basic Research Skills course previously co-taught by one of the authors. After an early attrition of four, 14 remaining clinicians attended 10 weekly one-hour classes with an average overall attendance rate of 79.5%. Eight of 14 (57%) completed pre- and posttests, with significant improvement in scores from 51% pre-test to 75% posttest. Six research projects were generated from the 14 clinicians. The authors demonstrated that even busy clinicians can be engaged in the process of developing research projects. An unexpected benefit was the demonstration of mutual respect when sources of expertise taught and learned together.

  3. Activitivities of Japanese EMTP Committee (JEC) and EMTP Development Coordination Group Project (EMTP-DCG Project)

    NASA Astrophysics Data System (ADS)

    Nagaoka, Naoto; Motoyama, Hideki; Funabashi, Toshihisa

    The Electromagnetic Transients Program (EMTP) is a common software for analyzing the electromagnetic transient phenomena, the electromechanical dynamics, and the control system transients in electric power systems and electronic circuits. Since the late 1960's, the EMTP has been developed by many contributors, and various capabilities, functions and auxiliary programs have been added to the EMTP. In the first half of the paper, history of Japanese EMTP Committee (JEC) and its activity is described. The basic policy of the JEC is “neutral” and “public domain”. The objectives, members, recent workshops and publications are introduced in this report. The activity of the JEC covers any EMTP version, such as ATP- and DCG-EMTP, derived from the BPA-EMTP. The second part of this paper presents the history and products of the EMTP Development Coordination Group Project (EMTP-DCG Project), which is organized to rationalize the development of the EMTP.

  4. Project lifestyle: developing positive health lifestyles for schoolchildren in Antigua.

    PubMed

    Sinha, D P

    1992-12-01

    Countries of the English-speaking Caribbean are in epidemiological transition. Following 30 years of socioeconomic change, obesity and chronic diseases have almost replaced malnutrition and infectious diseases as major health problems. Major risk factors for this modern epidemic are lifestyle-related. Project Lifestyle seeks to develop positive health lifestyles in schoolchildren gradually, sequentially, and systematically from grades 1-12 and throughout the school system on the island of Antigua. The four health habits addressed include weighing right, eating right, doing daily physical exercise, and having a positive self-concept. Since risk interventions with schoolchildren have produced positive results in several developed countries, this project developed an intervention methodology in the Caribbean context.

  5. Final project report: High energy rotor development, test and evaluation

    SciTech Connect

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  6. Update of the Solar Concentrator Advanced Development Project

    NASA Technical Reports Server (NTRS)

    Corrigan, Robert D.; Peterson, Todd T.; Ehresman, Derik T.

    1989-01-01

    The Solar Concentrator Advanced Development Project, which has achieved the successful design, fabrication, and testing of a full-scale prototypical solar dynamic concentrator, is discussed. The design and fabrication process are summarized, and the test results for the reflective facet optical performance and the concentrator structural repeatability are reported. Initial testing of structural repeatability of a seven panel portion of the concentrator was followed by assembly and testing of the full nineteen-panel structure. The testing, which consisted of theodolite and optical measurements over an assembly-disassembly-reassembly cycle, demonstrated that the concentrator maintained the as-built contour and optical characteristics. The facet development effort, which entailed developing a vapor-deposited reflective facet, produced a viable design with demonstrated optical characteristics that are within the project goals.

  7. Update of the Solar Concentrator Advanced Development Project

    NASA Technical Reports Server (NTRS)

    Corrigan, Robert D.; Peterson, Todd T.; Ehresman, Derik T.

    1989-01-01

    The Solar Concentrator Advanced Development Project, which has achieved the successful design, fabrication, and testing of a full-scale prototypical solar dynamic concentrator, is discussed. The design and fabrication process are summarized, and the test results for the reflective facet optical performance and the concentrator structural repeatability are reported. Initial testing of structural repeatability of a seven panel portion of the concentrator was followed by assembly and testing of the full nineteen-panel structure. The testing, which consisted of theodolite and optical measurements over an assembly-disassembly-reassembly cycle, demonstrated that the concentrator maintained the as-built contour and optical characteristics. The facet development effort, which entailed developing a vapor-deposited reflective facet, produced a viable design with demonstrated optical characteristics that are within the project goals.

  8. NASA Redox Storage System Development Project. Final report

    SciTech Connect

    Hagedorn, N.H.

    1984-10-01

    The Redox Storage System Technology Project was jointly supported by the US Department of Energy and NASA. The objectives of the project were to develop the Redox flow battery concept and to prove its technical and economic viability. The iron and chromium redox couples were selected as the reactants. Membranes and electrodes were developed for the original mode of operating at 25/sup 0/C with the reactants separated by an ion-exchange membrane. Analytical capabilities and system-level operating concepts were developed and verified in a 1-kW, 13-kWh pre-prototype system. A subsequent change was made in operating mode, going to 65/sup 0/C and using mixed reactants. New membranes and a new electrode catalyst were developed, resulting in single cell operation as high as 80 mA/cm/sup 2/ with energy efficiencies greater than 80%. Studies indicate a likely system cost of about $75/kWh. Standard Oil of Ohio (Sohio) has undertaken further development of the Redox system. An exclusive patent license was obtained from NASA by Sohio. Transfer of Redox technology to Sohio is supported by the NASA Technology Utilization Office. This report covers the full duration of the project.

  9. [Anthropology and oral health projects in developing countries].

    PubMed

    Grasveld, A E

    2016-01-01

    The mouth and teeth play an important role in social interactions around the world. The way people deal with their teeth and mouth, however, is determined culturally. When oral healthcare projects are being carried out in developing countries, differing cultural worldviews can cause misunderstandings between oral healthcare providers and their patients. The oral healthcare volunteer often has to try to understand the local assumptions about teeth and oral hygiene first, before he or she can bring about a change of behaviour, increase therapy compliance and make the oral healthcare project sustainable. Anthropology can be helpful in this respect. In 2014, in a pilot project commissioned by the Dutch Dental Care Foundation, in which oral healthcare was provided in combination with anthropological research, an oral healthcare project in Kwale (Kenia) was evaluated. The study identified 6 primary themes that indicate the most important factors influencing the oral health of school children in Kwale. Research into the local culture by oral healthcare providers would appear to be an important prerequisite to meaningful work in developing countries.

  10. Promoting Sustainable Development through Whole School Approaches: An International, Intercultural Teacher Education Research and Development Project

    ERIC Educational Resources Information Center

    Shallcross, Tony; Loubser, Callie; Le Roux, Cheryl; O'Donoghue, Rob; Lupele, Justin

    2006-01-01

    This paper focuses on a British Council funded Higher Education Link project involving three institutions--Manchester Metropolitan University (MMU) in the UK and two South African institutions, the University of South Africa (UNISA) and Rhodes University. The link is a research and development project that has three main research strands:…

  11. Promoting Sustainable Development through Whole School Approaches: An International, Intercultural Teacher Education Research and Development Project

    ERIC Educational Resources Information Center

    Shallcross, Tony; Loubser, Callie; Le Roux, Cheryl; O'Donoghue, Rob; Lupele, Justin

    2006-01-01

    This paper focuses on a British Council funded Higher Education Link project involving three institutions--Manchester Metropolitan University (MMU) in the UK and two South African institutions, the University of South Africa (UNISA) and Rhodes University. The link is a research and development project that has three main research strands:…

  12. Integrated development and testing plan for the plutonium immobilization project

    SciTech Connect

    Kan, T.

    1998-07-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the plutonium

  13. ODIP - Ocean Data Interoperability Platform - developing interoperabilty Pilot project 1

    NASA Astrophysics Data System (ADS)

    Schaap, D.

    2014-12-01

    Europe, the USA, Australia and IOC/IODE are making significant progress in facilitating the discovery and access of marine data through the development, implementation, population and operation of national, regional or international distributed ocean and marine observing and data management infrastructures such as SeaDataNet, Geo-Seas, IOOS, the Australian Ocean Portal and the IODE Ocean Data Portal. All of these developments are resulting in the development and implementation of standards for the formats of metadata, data, data products, quality control methods and flags, common vocabularies. They are also providing services for data discovery, viewing and downloading, and software tools for editing, conversions, communication, analysis and presentation, all of which are increasingly being adopted and used by their national and regional marine communities.The Ocean Data Interoperability Platform (ODIP)project is supported by the EU FP7 Research Infrastructures programme, National Science Foundation (USA) and Australian government and has started 1st October 2012. ODIP includes all the major organisations engaged in ocean data management in EU, US, and Australia. ODIP is also supported by the IOC -IODE, closely linking this activity with its Ocean Data Portal (ODP) and Ocean Data Standards (ODS) projects.The ODIP platform aims to ease interoperability between the regional marine data management infrastructures. Therefore it facilitates an organised dialogue between the key infrastructure representatives by means of publishing best practice, organising international workshops and fostering the development of common standards and interoperability solutions. These are evaluated and tested by means of prototype projects. The ODIP Prototype project 1 aims at establishing interoperability between the regional EU, USA and Australia data discovery and access services (SeaDataNet CDI, US NODC, and IMOS MCP) and contributing to the global GEOSS and IODE-ODP Portals. Use is

  14. Development of a Liquefied Noble Gas Time Projection Chamber

    NASA Astrophysics Data System (ADS)

    Lesser, Ezra; White, Aaron; Aidala, Christine

    2015-10-01

    Liquefied noble gas detectors have been used for various applications in recent years for detecting neutrinos, neutrons, photons, and potentially dark matter. The University of Michigan is developing a detector with liquid argon to produce scintillation light and ionization electrons. Our data collection method will allow high-resolution energy measurement and spatial reconstruction of detected particles by using multi-pixel silicon photomultipliers (SiPM) and a cylindrical time projection chamber (TPC) with a multi-wire endplate. We have already designed a liquid argon condenser and purification unit surrounded by an insulating vacuum, constructed circuitry for temperature and pressure sensors, and created software to obtain high-accuracy sensor readouts. The status of detector development will be presented. Funded through the Michigan Memorial Phoenix Project.

  15. Development of a 3D printer using scanning projection stereolithography.

    PubMed

    Lee, Michael P; Cooper, Geoffrey J T; Hinkley, Trevor; Gibson, Graham M; Padgett, Miles J; Cronin, Leroy

    2015-04-23

    We have developed a system for the rapid fabrication of low cost 3D devices and systems in the laboratory with micro-scale features yet cm-scale objects. Our system is inspired by maskless lithography, where a digital micromirror device (DMD) is used to project patterns with resolution up to 10 µm onto a layer of photoresist. Large area objects can be fabricated by stitching projected images over a 5 cm(2) area. The addition of a z-stage allows multiple layers to be stacked to create 3D objects, removing the need for any developing or etching steps but at the same time leading to true 3D devices which are robust, configurable and scalable. We demonstrate the applications of the system by printing a range of micro-scale objects as well as a fully functioning microfluidic droplet device and test its integrity by pumping dye through the channels.

  16. Development of a 3D printer using scanning projection stereolithography

    PubMed Central

    Lee, Michael P.; Cooper, Geoffrey J. T.; Hinkley, Trevor; Gibson, Graham M.; Padgett, Miles J.; Cronin, Leroy

    2015-01-01

    We have developed a system for the rapid fabrication of low cost 3D devices and systems in the laboratory with micro-scale features yet cm-scale objects. Our system is inspired by maskless lithography, where a digital micromirror device (DMD) is used to project patterns with resolution up to 10 µm onto a layer of photoresist. Large area objects can be fabricated by stitching projected images over a 5cm2 area. The addition of a z-stage allows multiple layers to be stacked to create 3D objects, removing the need for any developing or etching steps but at the same time leading to true 3D devices which are robust, configurable and scalable. We demonstrate the applications of the system by printing a range of micro-scale objects as well as a fully functioning microfluidic droplet device and test its integrity by pumping dye through the channels. PMID:25906401

  17. The benefits of dynamic simulation to the Mensa development project

    SciTech Connect

    Lamey, M.F.; Lang, P.; Rainey, M.; Turner, S.; Wasden, F.

    1998-12-31

    Deep water production and sub sea tiebacks have presented new operational challenges for production operators. Shell Deepwater Development Inc. recent developed a dynamic simulation of its record setting Mensa gas field sub sea development. The project has set world records for water depth and pipeline length. The model revealed several transient conditions that were not readily apparent from earlier work and/or development tools. Changes to the start up plan and normal operating guidelines resulted. The model was also used to train operating personnel in the dynamic response of the system, which is significantly different from conventional offshore systems. A data collection plan was developed and implemented to compare actual vs. predicted operating conditions. Results and recommendation for future developments are presented.

  18. NASA Game Changing Development Program Manufacturing Innovation Project

    NASA Technical Reports Server (NTRS)

    Tolbert, Carol; Vickers, John

    2011-01-01

    This presentation examines the new NASA Manufacturing Innovation Project. The project is a part of the Game Changing Development Program which is one element of the Space Technology Programs Managed by Office of the Chief Technologist. The project includes innovative technologies in model-based manufacturing, digital additive manufacturing, and other next generation manufacturing tools. The project is also coupled with the larger federal initiatives in this area including the National Digital Engineering and Manufacturing Initiative and the Advanced Manufacturing Partnership. In addition to NASA, other interagency partners include the Department of Defense, Department of Commerce, NIST, Department of Energy, and the National Science Foundation. The development of game-changing manufacturing technologies are critical for NASA s mission of exploration, strengthening America s manufacturing competitiveness, and are highly related to current challenges in defense manufacturing activities. There is strong consensus across industry, academia, and government that the future competitiveness of U.S. industry will be determined, in large part, by a technologically advanced manufacturing sector. This presentation highlights the prospectus of next generation manufacturing technologies to the challenges faced NASA and by the Department of Defense. The project focuses on maturing innovative/high payoff model-based manufacturing technologies that may lead to entirely new approaches for a broad array of future NASA missions and solutions to significant national needs. Digital manufacturing and computer-integrated manufacturing "virtually" guarantee advantages in quality, speed, and cost and offer many long-term benefits across the entire product lifecycle. This paper addresses key enablers and emerging strategies in areas such as: Current government initiatives, Model-based manufacturing, and Additive manufacturing.

  19. Results of SEI Independent Research and Development Projects

    DTIC Science & Technology

    2008-07-01

    Results of SEI Independent Research and Development Projects Len Bass, Dionisio de Niz, Jörgen Hansson, John Hudak, Peter H. Feiler, Don...Performance Challenges of Modern Hardware Architectures for Real-Time Systems 8 Dionisio de Niz, Jörgen Hansson, John Hudak, and Peter H. Feiler 8 3.1...Presentations 25 4.7 References 26 5 A Software System Engineering Approach for Fault Containment 28 Peter H. Feiler, Dionisio de Niz, Jörgen Hansson, Lui

  20. Singer AI Project: Knowledge-Based Vision Algorithm Development.

    DTIC Science & Technology

    1986-08-01

    Distribution Statemient Vision algorithm development Expert system d-c.umnth..beSThi-, ocument as een approved ATR Ifcr public release and sale; its Knowledge...Acquisition Environment 51 4.6 Inference Engine 51 4.7 Prototype Expert System 51 5. CONCLUSION ..... .............. ... .. . . . 53 4 bi t -ERIM 1...this end, a prototype expert system image algorithmist decision aid was designed and implemented. All of the project goals were either met or

  1. Energy Efficient Community Development in California: Chula Vista Research Project

    SciTech Connect

    Gas Technology Institute

    2009-03-31

    In 2007, the U.S. Department of Energy joined the California Energy Commission in funding a project to begin to examine the technical, economic and institutional (policy and regulatory) aspects of energy-efficient community development. That research project was known as the Chula Vista Research Project for the host California community that co-sponsored the initiative. The researches proved that the strategic integration of the selected and economically viable buildings energy efficiency (EE) measures, photovoltaics (PV), distributed generation (DG), and district cooling can produce significant reductions in aggregate energy consumption, peak demand and emissions, compared to the developer/builder's proposed baseline approach. However, the central power plant emission reductions achieved through use of the EE-DG option would increase local air emissions. The electric and natural gas utility infrastructure impacts associated with the use of the EE and EE-PV options were deemed relatively insignificant while use of the EE-DG option would result in a significant reduction of necessary electric distribution facilities to serve a large-scale development project. The results of the Chula Vista project are detailed in three separate documents: (1) Energy-Efficient Community Development in California; Chula Vista Research Project report contains a detailed description of the research effort and findings. This includes the methodologies, and tools used and the analysis of the efficiency, economic and emissions impacts of alternative energy technology and community design options for two development sites. Research topics covered included: (a) Energy supply, demand, and control technologies and related strategies for structures; (b) Application of locally available renewable energy resources including solar thermal and PV technology and on-site power generation with heat recovery; (c) Integration of local energy resources into district energy systems and existing energy

  2. ODIP - Ocean Data Interoperability Platform - developing interoperabilty Pilot project 1

    NASA Astrophysics Data System (ADS)

    Schaap, Dick M. A.; Glaves, Helen

    2014-05-01

    Europe, the USA, Australia and IOC/IODE are making significant progress in facilitating the discovery and access of marine data through the development, implementation, population and operation of national, regional or international distributed ocean and marine observing and data management infrastructures such as SeaDataNet, Geo-Seas, IOOS, the Australian Ocean Portal and the IODE Ocean Data Portal. All of these developments are resulting in the development and implementation of standards for the formats of metadata, data, data products, quality control methods and flags, common vocabularies. They are also providing services for data discovery, viewing and downloading, and software tools for editing, conversions, communication, analysis and presentation, all of which are increasingly being adopted and used by their national and regional marine communities. There is also a general trend towards the use of the basic ISO and OGC standards, however these allow the use of different profiles and vocabularies. As a result there are differences in the standards used in the different regions which hinder their direct exchange and use at an international and global scale, and as a result act as a barrier to the realisation of global portals such as the IODE Ocean Data Portal and GEOSS. The Ocean Data Interoperability Platform (ODIP) project is supported by the EU FP7 Research Infrastructures programme, National Science Foundation (USA) and Australian government and has started 1st October 2012. ODIP includes all the major organisations engaged in ocean data management in EU, US, and Australia. ODIP is also supported by the IOC -IODE, closely linking this activity with its Ocean Data Portal (ODP) and Ocean Data Standards (ODS) projects. The ODIP platform aims to ease interoperability between the regional marine data management infrastructures. Therefore it facilitates an organised dialogue between the key infrastructure representatives by means of publishing best practice

  3. Mineral project selection and economic development: the case of Namibia

    SciTech Connect

    Torries, T.; Rose, A.; Chen, C.Y.

    1988-01-01

    Many developing countries have ill-defined, though potentially important, mineral wealth, and always have a shortage of capital and management. Their governments must decide how scarce resources are best allocated among mineral projects and broader socio-economic needs such as infrastructure and education. Questions that must be answered in order to formulate development strategies include: (1) what are the probabilities of direct gains from mineral exploration and development, (2) what are the primary and secondary effects of such mineral development on the economy, and (3) what regions or specific mineral targets have the greatest potential. This paper combines a probabilistic assessment of a region's mineral resource base with an input-output analysis of its economy in an attempt to answer these questions. The probabilistic analysis involves the use of geologic data, analogy methods, and expert opinions to quantify the expected values of potential mineral development. The I-O application involves a determination of second-order output, employment and income changes associated with mining. Such information will enable decision-makers to broaden the scope of benefits in project analysis. Namibia is used as a case example. Mineral wealth is one of the only resources available in this very poor region of the world. This study provides information on the feasibility of a mining-development strategy. 20 references, 4 figures, 8 tables.

  4. Developing Information Literacy through Independent Learning Projects in a UK Setting: Pilot Projects for Year 9 and Year 6 Pupils

    ERIC Educational Resources Information Center

    Jones, Rebecca

    2010-01-01

    Two information literacy skills pilot projects are being undertaken at Malvern St James School (MSJ) with Year 6 and Year 9 pupils during 2009-10. The projects encourage the development of independent learning skills, with pupils planning, managing and executing both the research and practical elements of their project. Each pupil sets their own…

  5. Advanced Gas Turbine (AGT) Technology Development Project: Final report

    SciTech Connect

    Not Available

    1988-03-01

    This report is the final in a series of Technical Summary Reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167 and sponsored by the DOE. The project was administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report summarizes plans and progress from October 1979 through June 1987. Project effort conducted under this contract is part of the DOE Gas Turbine Highway Vehicle Systems Program. This program is directed at providing the United States automotive industry the high-risk, long range technology necessary to produce gas turbine engines for automobiles that will have reduced fuel consumption and reduced environmental impact. The intent is that this technology will be capable of reaching the marketplace by the 1990s. The Garrett/Ford automotive Advanced Gas Turbine has been designated the AGT101. The AGT101 nominally is a 74.5 kw (100 shp) engine, capable of speeds to 100,000 rpm and operating at turbine inlet temperatures to 1370C (2500F) with a specific fuel consumption level of 0.18 kg/kw-hr (0.3 lbs/hp-hr) over most of the operating range. This final report summarizes the powertrain design, power section development, and component/ceramic technology development. Appendices include summary reports of progress from Ford Motor Company, AiResearch Casting Company and Pure Carbon, acting as major subcontractors and suppliers of ceramic materials and components. Standard Oil Company's Unique and Common work accomplished under this program is published in topical report (TBD).

  6. Development of the NASA Digital Astronaut Project Muscle Model

    NASA Technical Reports Server (NTRS)

    Lewandowski, Beth E.; Pennline, James A.; Thompson, W. K.; Humphreys, B. T.; Ryder, J. W.; Ploutz-Snyder, L. L.; Mulugeta, L.

    2015-01-01

    This abstract describes development work performed on the NASA Digital Astronaut Project Muscle Model. Muscle atrophy is a known physiological response to exposure to a low gravity environment. The DAP muscle model computationally predicts the change in muscle structure and function vs. time in a reduced gravity environment. The spaceflight muscle model can then be used in biomechanical models of exercise countermeasures and spaceflight tasks to: 1) develop site specific bone loading input to the DAP bone adaptation model over the course of a mission; 2) predict astronaut performance of spaceflight tasks; 3) inform effectiveness of new exercise countermeasures concepts.

  7. Programmable SAW development :Sandia/NASA project final report.

    SciTech Connect

    Brocato, Robert Wesley

    2004-10-01

    This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

  8. The `advanced DIR-MCFC development' project, an overview

    NASA Astrophysics Data System (ADS)

    Kortbeek, P. J.; Ottervanger, R.

    An overview is given of the approach and mid-term status of the joint European `Advanced DIR-MCFC Development' project, in which BCN, BG plc, GDF, ECN, Stork, Schelde and Sydkraft co-operate. Hospitals are identified as an attractive initial market for cogeneration direct internal reforming-molten carbonate fuel cell (DIR-MCFC) systems in the size of 400 kWe. Innovative system and stack design concepts are being developed for this application. The `SMARTER' system, based on DIR stacks, combines high electric efficiency and a wide operational window with optimal system simplicity and low cost.

  9. Setting up a kinase discovery and development project.

    PubMed

    Bollag, Gideon

    2012-01-01

    Discovery of novel kinase inhibitors has matured rapidly over the last decade. Paramount to the successful development of kinase inhibitors is appropriate selectivity for validated targets. Many different approaches have been applied over the years, with varied results. There are currently thirteen different small molecule protein kinase inhibitors on the marketplace. Interestingly, a majority of these compounds lack precise selectivity for specific targets. This will change in the coming years, as technology for achieving improved selectivity becomes more widely applied. This chapter will focus on some of the critical considerations in setting up a kinase discovery and development project, citing examples particularly targeting the Raf kinases.

  10. The Thirty-Meter Telescope project design and development phase

    NASA Astrophysics Data System (ADS)

    Stepp, Larry M.; Strom, Stephen E.

    2004-07-01

    The U.S. National Observatories have responded to the call of the astronomy decadal survey committee to develop a Giant Segmented Mirror Telescope by forming the AURA New Initiatives Office. Drawing on the engineering and scientific staffs of the National Optical Astronomy Observatory and the Gemini Observatory, NIO has for the past 30 months carried out studies aimed at: understanding the key science drivers for a thirty-meter telescope; developing a feasible point design that is responsive to the science goals; and identifying key technical issues that must be solved in order to successfully build such a telescope. In parallel, NIO has followed the charge of the decadal survey to identify potential private and international partners to fulfill the committee vision of a public-private partnership to build and operate this facility. NIO has now joined with two other groups -- the CELT Development Corporation (a partnership between the University of California and the California Institute of Technology) and the Association of Canadian Unviersities for Research In Astronomy (ACURA) -- to initiate the next step, the design & development (D & D) phase of a joint project that is being called the Thirty-Meter Telescope (TMT) Project. This paper reviews the plans for the TMT D & D phase, including the organizational structure, science requirements, and plans for conceptual design studies, technology development, and site selection.

  11. SIMRAND I- SIMULATION OF RESEARCH AND DEVELOPMENT PROJECTS

    NASA Technical Reports Server (NTRS)

    Miles, R. F.

    1994-01-01

    The Simulation of Research and Development Projects program (SIMRAND) aids in the optimal allocation of R&D resources needed to achieve project goals. SIMRAND models the system subsets or project tasks as various network paths to a final goal. Each path is described in terms of task variables such as cost per hour, cost per unit, availability of resources, etc. Uncertainty is incorporated by treating task variables as probabilistic random variables. SIMRAND calculates the measure of preference for each alternative network. The networks yielding the highest utility function (or certainty equivalence) are then ranked as the optimal network paths. SIMRAND has been used in several economic potential studies at NASA's Jet Propulsion Laboratory involving solar dish power systems and photovoltaic array construction. However, any project having tasks which can be reduced to equations and related by measures of preference can be modeled. SIMRAND analysis consists of three phases: reduction, simulation, and evaluation. In the reduction phase, analytical techniques from probability theory and simulation techniques are used to reduce the complexity of the alternative networks. In the simulation phase, a Monte Carlo simulation is used to derive statistics on the variables of interest for each alternative network path. In the evaluation phase, the simulation statistics are compared and the networks are ranked in preference by a selected decision rule. The user must supply project subsystems in terms of equations based on variables (for example, parallel and series assembly line tasks in terms of number of items, cost factors, time limits, etc). The associated cumulative distribution functions and utility functions for each variable must also be provided (allowable upper and lower limits, group decision factors, etc). SIMRAND is written in Microsoft FORTRAN 77 for batch execution and has been implemented on an IBM PC series computer operating under DOS.

  12. Astronomy and development: a multidisciplinary project in the Mexican countryside

    NASA Astrophysics Data System (ADS)

    Bravo Alfaro, Hector; Caretta, César; Brito, Elcia M. S.

    2015-08-01

    We outline a long term project focused on children and young students living in rural places of the Mexican State of Guanajuato. This multidisciplinary project includes astronomers, environment engineers, biologists and sociologists of Universidad de Guanajuato. One part of the activities are done in situ, at the villages, and other is currently proposed to be held at the Public Astronomical Observatory of Universidad de Guanajuato. Organizing the trips and the activities for scholar groups at the observatory (where telescopes, computers and microscopes are available) would fit very well within several of the IAU-OAD strategies. We expect that, attending the FM20 of the IAU and presenting our results there will help us to develop regionalcollaborations and showing the many opportunities for new possible volunteers.

  13. A role for NGOs in international renewable energy project development

    SciTech Connect

    Bartholf, T.R.

    1997-12-01

    An NGO is an international term for non-government organizations, often it is used in connection with non-profit, community-based and/or voluntary business activities. To be successful in supporting energy projects, these organizations generally exhibit certain characteristics: they are familiar with the end-use requirements; they are typically neutral to the technology; they emphasize training; they do not carry a large bureacratic structure, at home or in the field; they typically can adapt to do numerous functions; they can often attract other support. The author discusses several examples of such organizations who have been highly successful. The author sees a continuing role for such groups in developing renewable energy sources in the rural setting to include: continued development of new activity in rural areas; development of institutional framework for future market activity; an increased role in managing international development activities; more direct involvement with for-profit technical and financial organizations.

  14. New perspective for the development of Bemolanga Tar Sand Project

    SciTech Connect

    Rakoto-Andriantsilavo, M.D.; Lalaharisaina, J.V.; Spariharijaona, A.

    1995-12-31

    As known, Madagascar has available tar sand deposit which is estimated at 3 billions tons. During the past ten years, OMNIS, a stage agency for hydrocarbons exploration, performed studies (prefeasibility and feasibility) the aim of which was to produce a 15,000 BPD of synthetic crude to satisfy domestic petroleum needs this potential resource. In the framework of this project, some bitumen extraction processes were tested at the scales of laboratory and/or pilot-unit (CLARK HOT WATER process, TOSCO process, L.R. process, RTR process, and AOSTRA/Taciuk process). In addition, mining and upgrading engineering evaluations were carried out. The results of these investigations display that an ore open-pit mining exploitation, bitumen extraction and upgrading are technically feasible. Nevertheless, some problems arise for the economy of the whole project which is capital intensive and marginal. In the actual petroleum industry environment, where crude prices continue to drop and no perspective price increase is anticipated in the near future, it is difficult or even impossible to promote the project and attract petroleum companies. This unfavourable situation leads to review and consideration of alternatives for the development of this huge resource which could assist the Malagasy Republic with its economy. After the presentation of the main results issued from Bemolanga syncrude production project, this paper deals with such alternative and attempts to elaborate an outline for a new concept of the development of Bemolanga resource. This preliminary outline, considered in the actual Malagasy economic framework where private national and/or international investment is encouraged, tries to overcome the requirement of a high initial investment cost for an industrial scale plant by an approach via a demonstration unit which produces a road bitumen and could further finance the extension to an industrial syncrude production plant.

  15. Developments in Services for Handicapped People--Africa. A Project Report.

    ERIC Educational Resources Information Center

    Burress, James R.; Perlman, Leonard G.

    The document describes a research and demonstration project to identify and develop information about rehabilitation programs for handicapped people in African countries. Initial chapters deal with introductory information (need for the project, project objectives, summary of work plan); a description of the project; project procedures; and…

  16. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ...-Federal development of environmentally sustainable hydropower potential on Federal water resource projects... sustainable, low impact, or small hydropower development that avoids, reduces, or minimizes environmental... Bureau of Reclamation Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project,...

  17. THE CAVES PROJECT — Collaborative Analysis Versioning Environment System, THE CODESH PROJECT — COllaborative DEvelopment SHell

    NASA Astrophysics Data System (ADS)

    Bourilkov, Dimitri

    A key feature of collaboration in science and software development is to have a log of what and how is being done - for private use and reuse and for sharing selected parts with collaborators, which most often today are distributed geographically on an ever larger scale. Even better if this log is automatic, created on the fly while a scientist or software developer is working in a habitual way, without the need for extra efforts. The CAVES and CODESH projects address this problem in a novel way, building on the concepts of virtual state and virtual transition to provide an automatic persistent logbook for sessions of data analysis or software development in a collaborating group. A repository of sessions can be configured dynamically to record and make available the knowledge accumulated in the course of a scientific or software endeavor. Access can be controlled to define logbooks of private sessions and sessions shared within or between collaborating groups.

  18. Manufacturing technology education development project. Project accomplishment summary for 91-Y12P-050-A1

    SciTech Connect

    Douglass, S.; Smith, R.

    1996-09-25

    The purpose of the project was to provide a set of supplemental instructional equipment and materials to Tennessee high school students to raise their level of knowledge about manufacturing technologies with the hope that some of the best and brightest would choose manufacturing as a career path. The role of the Y-12 Plant was primarily technical: renovate the portable classroom; select and purchase appropriate equipment; install and test the equipment; assist in the development of the curriculum; train the initial group of teachers; and provide technical assistance where needed after the laboratory was deployed. The role of the Department of Education was to provide the mobile facility; assist in the design of the laboratory; lead the development of the curriculum; deploy the trailer; and develop the structure for administering the selection of schools, training teachers, and movement of the laboratory. The Department of Education as subcontracted with Middle Tennessee State University to handle the details of laboratory deployment.

  19. Test development for the thermionic system evaluation test (TSET) project

    NASA Astrophysics Data System (ADS)

    Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.

    1992-01-01

    The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.

  20. Progress of excimer laser development in the AMMTRA project

    NASA Astrophysics Data System (ADS)

    Nagai, Haruhiko

    1993-05-01

    Since 1986, five kinds of excimer laser technologies have been studied by five companies as part of the large-scale project `Advanced Material-Processing and Machining System,' which is one of the national R&D projects in Japan. The five kinds of excimer lasers being developed are as follows: (1) high power XeCl laser with an average power of 2 kW, (2) high repetition rate XeCl laser with a repetition rate of 5 kHz, (3) automatically power-stabilized 400 W average power XeCl laser with a stability of +/- 1% or less, (4) long-life ArF laser with a gas life of 109 shots or more, and (5) high beam-quality ArF laser with an average power of 200 W. The project passed an interim evaluation at the end of fiscal 1990, and is now ongoing toward the achievement of final targets as of the end of fiscal 1993. The present status and future prospect of the technologies are reviewed.

  1. Major glutamatergic projection from subplate into visual cortex during development.

    PubMed

    Finney, E M; Stone, J R; Shatz, C J

    1998-08-17

    Subplate neurons, the first neurons of the cerebral cortex to differentiate and mature, are thought to be essential for the formation of connections between thalamus and cortex, such as the system of ocular dominance columns within layer 4 of visual cortex. To learn more about the requirement for subplate neurons in the formation of thalamocortical connections, we have sought to identify the neurotransmitters and peptides expressed by the specific class of subplate neurons that sends axonal projections into the overlying visual cortex. To label retrogradely subplate neurons, fluorescent latex microspheres were injected into primary visual cortex of postnatal day 28 ferrets, just prior to the onset of ocular dominance column formation. Subsequently, neurons were immunostained with antibodies against glutamate, glutamic acid decarboxylase (GAD-67), parvalbumin, neuropeptide Y (NPY), somatostatin (SRIF), or nitric oxide synthase (NOS). Retrograde labeling results indicate that the majority of subplate neurons projecting into the cortical plate reside in the upper half of the subplate. Combined immunostaining and microsphere labeling reveal that about half of cortically projecting subplate neurons are glutamatergic; most microsphere-labeled subplate neurons do not stain for GAD-67, parvalbumin, NPY, SRIF, or NOS. These observations suggest that subplate neurons can provide a significant glutamatergic synaptic input to the cortical plate, including the neurons of layer 4. If so, excitation from the axons of subplate neurons may be required in addition to that from lateral geniculate nucleus neurons for the activity-dependent synaptic interactions that lead to the formation of ocular dominance columns during development.

  2. Development of a site analysis tool for distributed wind projects

    SciTech Connect

    Shaw, Shawn

    2012-02-28

    The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimates of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.

  3. Geographic information system development in the CARETS project

    USGS Publications Warehouse

    Mitchell, William B.; Fegeas, Robin G.; Fitzpatrick, Katherine A.; Hallam, Cheryl A.

    1977-01-01

    Experience in the development of a geographic information system to support the CARETS project has confirmed the considerable advantages that may accrue by paralleling the system development with a rational and balanced system production effort which permits the integration of the education and training of users with interim deliverable products to them. Those advantages include support for a long-term staff plan that recognizes substantial staff changes through system development and implementation, a fiscal plan that provides continuity in resources necessary for total system development, and a feedback system which allows the user to communicate his experiences in using the system. Thus far balance between system development and system production has not been achieved because of continuing large-scale spatial data processing requirements coupled with strong and insistent demands from users for immediately deliverable products from the system. That imbalance has refocussed staffing and fiscal plans from long-term system development to short- and near-term production requirements, continuously extends total system development time, and increases the possibility that later system development may reduce the usefulness of current interim products.

  4. Physics Teachers' Professional Development in the Project "physics in Context"

    NASA Astrophysics Data System (ADS)

    Mikelskis-Seifert, Silke; Duit, Reinders

    2013-06-01

    Developing teachers' ways of thinking about "good" instruction as well as their views of the teaching and learning process is generally seen as essential for improving teaching behaviour and implementation of more efficient teaching and learning settings. Major deficiencies of German physics instruction as revealed by a nationwide video-study on the practice of physics instruction are addressed. Teachers participating in the project are made familiar with recent views of efficient instruction on the one hand and develop context-based instructional settings on the other. The evaluation resulted in partly encouraging findings. However, it also turned out that a number of teachers' ways of thinking about good instruction did only develop to a somewhat limited degree. The most impressive changes occurred for teachers who enjoyed the most intensive coaching.

  5. Physics Teachers' Professional Development in the Project "physics in Context"

    NASA Astrophysics Data System (ADS)

    Mikelskis-Seifert, Silke; Duit, Reinders

    2012-12-01

    Developing teachers' ways of thinking about "good" instruction as well as their views of the teaching and learning process is generally seen as essential for improving teaching behaviour and implementation of more efficient teaching and learning settings. Major deficiencies of German physics instruction as revealed by a nationwide video-study on the practice of physics instruction are addressed. Teachers participating in the project are made familiar with recent views of efficient instruction on the one hand and develop context-based instructional settings on the other. The evaluation resulted in partly encouraging findings. However, it also turned out that a number of teachers' ways of thinking about good instruction did only develop to a somewhat limited degree. The most impressive changes occurred for teachers who enjoyed the most intensive coaching.

  6. Recent developments in nanofabrication using ion projection lithography.

    PubMed

    Tseng, Ampere A

    2005-06-01

    Ion projection lithography (IPL) is an emerging technology and a major candidate for the next-generation lithography (NGL) designed to complement and supplement current optical lithographic techniques for future chip manufacturing. In this Review, the recent developments of IPL technology are examined with an emphasis on its ability to fabricate a wide variety of nanostructures for the semiconductor industry. Following an introduction of the uniqueness and strength of the technology, the basics of ion-source development and ion-target interactions with and without chemical enhancement are presented. The developments in equipment systems, masks, and resists are subsequently studied. The resolution of printed nanostructures and the corresponding throughput of the current system are assessed for NGL. Finally, concluding remarks are presented to summarize the strengths and weaknesses of the current technology and to suggest the scope for future improvement.

  7. Data acquisition system developed for the resonance absorption project

    SciTech Connect

    Arnone, G.J.; Hollas, C.L.

    1993-12-01

    Minimizing signal errors and losses in high-rate gamma-ray imaging systems places demands on the signal-processing and data acquisition electronics. We will describe the data acquisition system developed for the resonance absorption project and techniques used to minimize dead-time and data losses. The data acquisition system acquires pulse-height spectra from an array of gamma-ray detectors and is made available to multiple processors by using the VMEbus standard to provide concurrent data analysis. A SUN workstation is used to develop the application software and also provides the user interface. We have developed a pulse-height-analysis board that has been optimized for low dead time. By incorporating an independent, high-speed signal channel for each detector, we are able to improve performance over multiplexed techniques.

  8. Update on the NASA GRC Stirling Technology Development Project

    NASA Technical Reports Server (NTRS)

    Thieme, Lanny G.; Schreiber, Jeffrey G.

    2000-01-01

    The Department of Energy, NASA Glenn Research Center (GRC), and Stirling Technology Company (STC) are developing a free-piston Stirling convertor for a Stirling radioisotope power system (SRPS) to provide spacecraft on-board electric power for NASA deep space missions. The SRPS has recently been identified for potential use on the Europa Orbiter and Solar Probe Space Science missions. Stirling is also now being considered for unmanned Mars rovers. NASA GRC is conducting an in-house project to assist in developing the Stirling convertor for readiness for space qualification and mission implementation. As part of this continuing effort, the Stirling convertor will be further characterized under launch environment random vibration testing, methods to reduce convertor electromagnetic interference (EMI) will be developed, and an independent performance verification will be completed. Convertor life assessment and permanent magnet aging characterization tasks are also underway. Substitute organic materials for the linear alternator and piston bearing coatings for use in a high radiation environment have been identified and have now been incorporated in Stirling convertors built by STC for GRC. Electromagnetic and thermal finite element analyses for the alternator are also being conducted. This paper discusses the recent results and status for this NASA GRC in-house project.

  9. Development of the human superior colliculus and the retinocollicular projection.

    PubMed

    Qu, Jia; Zhou, Xiangtian; Zhu, Hua; Cheng, Gang; Ashwell, Ken W S; Lu, Fan

    2006-02-01

    We have used carbocyanine dye tracing from the brachium of the superior colliculus in conjunction with Nissl staining and immunohistochemistry to GAP-43 and calretinin to study the development of retinal projections to the superior colliculus in 17 human embryos and fetuses aged from 8 to 28 weeks. Lamination of the superior colliculus begins to emerge by 11 weeks, and by 16 weeks all seven layers of the mature superior colliculus are visible. Fibres immunoreactive to GAP-43 were seen at 13 weeks in the most superficial layers. By 19 weeks, GAP-43 immunoreactivity was present in the stratum opticum as well as the deeper fibres layers, indicating the development of fibre pathways following those laminae. Carbocyanine dye tracing of retinocollicular projections showed extensive rostrocaudally running unbranched fibres in the superficial superior colliculus at 12 weeks. Shortly after this (13 weeks), retinocollicular fibres penetrate the deeper collicular layers and branching becomes apparent. We also saw occasional retrogradely labelled somata following DiI insertion into the superior brachium. Our findings indicate that development of the human superior colliculus and its connections is largely complete by 20 weeks. This would suggest that functional capacity of the human superior colliculus should also be mature by the middle of gestation.

  10. The CERES S'COOL Project: Development and Operational Phases

    NASA Technical Reports Server (NTRS)

    Chambers, Lin H.; Young, David F.; Racel, Anne M.

    1998-01-01

    As part of NASA's Mission to Planet Earth, the first Clouds and the Earth's Radiant Energy System (CERES) instrument will be launched on the Tropical Rainfall Measuring Mission (TRMM) spacecraft from the Tanegashima launch site in Japan in November 1997. The instrument will measure the radiation budget incoming and outgoing radiant energy - of the Earth. The major feature of interest is clouds, which play a very strong role in regulating our climate. CERES will identify clear and cloudy regions and determine cloud physical and microphysical properties using imager data from a companion instrument. Validation efforts for the remote sensing algorithms will be intensive. As one component of the validation, the S'COOL (Students' Cloud Observations On-Line) project will involve school children around the globe in making ground truth measurements at the time of a CERES overpass. They will report cloud type, height, fraction, and opacity, as well as the local surface conditions. Their observations will be collected at the NASA Langley Distributed Active Archive Center (DAAC) and made available over the Internet for educational purposes as well as for use by the CERES Science Team in validation efforts. Pilot testing of the S'COOL project began in January 1997 with two local schools in Southeastern Virginia and one remote site in Montana. National testing in April 1997 involved 8 schools (grades 3 to high school) across the United States. Global testing will be carried out in October 1997. Details of the S'COOL project, which is mainly Internet-based, are being developed in each of these phases according to feedback received from participants. In 1998, when the CERES instrument is operational, a global observer network should be in place providing useful information to the scientists and learning opportunities to the students. Broad participation in the S'COOL project is planned, both to obtain data from a wide range of geographic areas, and to involve as many students as

  11. Financing health development projects: some macro-economic considerations.

    PubMed

    Sorkin, A L

    1986-01-01

    The paper briefly discusses the importance of macro-economic policy in health sector financing. The ways in which monetary and fiscal policy (macro-economic policy) affect interest rates, price levels and aggregate output are presented. The main portion of the paper considers a variety of methods for public financing of health and development projects. These approaches are analyzed in light of distributional and efficiency considerations. One way of increasing health sector resources is through reallocation from other sectors of the economy. The potential for redistribution from the defense to the health service industry is briefly considered.

  12. Development and Validation of a Project Package for Junior Secondary School Basic Science

    ERIC Educational Resources Information Center

    Udofia, Nsikak-Abasi

    2014-01-01

    This was a Research and Developmental study designed to develop and validate projects for Junior Secondary School Basic Science instruction and evaluation. The projects were developed using the project blueprint and sent for validation by experts in science education and measurement and evaluation; using a project validation scale. They were to…

  13. 34 CFR 664.12 - What is a curriculum development project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What is a curriculum development project? 664.12... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 664.12 What is a curriculum development project...

  14. A Research Design for NASA-Funded Professional Development Projects

    NASA Astrophysics Data System (ADS)

    Bleicher, R. E.; Lambert, J.; Getty, S. R.

    2011-12-01

    This proposal outlines a research plan designed to measure gains in student learning resulting from their teachers participating in professional development. Project Description Misconceptions about global climate change (GCC) are prevalent in the general public (Kellstedt, Zahran, & Vedlitz, 2008; Washington & Cook, 2011). One solution is to provide high school students with a better grounding in the basic science and data that underlie GCC. The overarching goal of a NASA-funded project, Promoting Educational Leadership in Climate Change Literacy (PEL), is to increase GCC literacy in high school students. Research Design The research design is interpretative (Erickson, 2006), framed within a multi-method design, synthesizing both quantitative and qualitative data sources (Morse, 2003). Overall, the data will provide rich information about the PEL's impact on curriculum development, teacher pedagogical knowledge, and student learning. The expectancy-value theory of achievement motivation (E-V-C) (Fan, 2011; Wigfield & Eccles, 1994) provides a theoretical foundation for the research. Expectancy is the degree to which a teacher or student has reason to expect that they will be successful in school. Value indicates whether they think that performance at school will be worthwhile to them. Cost is the perceived sacrifices that must be undertaken, or factors that can inhibit, a successful performance at school. For students, data from an embedded E-V-C investigation will help articulate how E-V-C factors relate to student interest in science, continuing to study science, or embarking on STEM related careers. For teachers, the E-V-C measures will give insight into a key mediating variable on student achievement in science. The evaluation will seek to address research questions at the student and teacher levels. Table 1 presents a sample of research questions and data sources. This is a sample of a much larger set of questions that will be addressed in the project. Data

  15. Choosing and Developing the Right Leadership Styles for Projects

    NASA Technical Reports Server (NTRS)

    Mueller, Ralf

    2008-01-01

    Analyzing extensive questionnaires completed by 400 project management professionals, Professor Rodney Turner of the Lille Graduate School of Management and I have identified competencies that contribute significantly to project management success. Our research helps define the managerial and emotional competencies needed to make projects work. We also found that different kinds of projects call for different combinations of competencies.

  16. Alaska Oil and Gas Exploration, Development, and Permitting Project

    SciTech Connect

    Richard McMahon; Robert Crandall

    2006-03-31

    This is the final technical report for Project 15446, covering the grant period of October 2002 through March 2006. This project connects three parts of the oil exploration, development, and permitting process to form the foundation for an advanced information technology infrastructure to better support resource development and resource conservation. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells. The broad goal of this grant is to increase domestic production from Alaska's known producing fields through the implementation of preferred upstream management practices. (PUMP). Internet publication of extensive and detailed geotechnical data is the first task, improving the permitting process is the second task, and building an advanced geographical information system to offer continuing support and public access of the first two goals is the third task. Excellent progress has been made on all three tasks; the technical objectives as defined by the approved grant sub-tasks have been met. The end date for the grant was March 31, 2006.

  17. DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT

    SciTech Connect

    DeBolt, Donald; Richmond, Marshall C.; Donelson, Richard K.; Strickler, Brad; Weisbeck, Molly

    2015-07-14

    The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbines with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.

  18. Metal hydride/chemical heat pump development project

    NASA Astrophysics Data System (ADS)

    Madariaga, H. A.; Rohy, D. A.

    1982-02-01

    A mental hydride heat pump (MHHP) is a chemical heat pump containing two different hydrides and using hydrogen as a working fluid for the storage and/or recovery of thermal energy. It utilizes the heat of reaction of hydrogen with specific metal alloys. The MHHP design can be tailored to provide heating and cooling or temperature upgrading over a wide range of input and ambient temperatures. This system can be used with a variety of heat sources including industrial waste heat, solar energy or a fossil fuel. Temperature as low as 130 F can drive the MHHP when a suitable sink is provided. A project is currently underway to develop this unique heat pump for a specific application. The goals of the project include the development of cost effective hydride containers with high heat transfer and low mass; design and fabrication of a laboratory evaluation model; and design and fabrication of a demonstration unit. Extensive component and system test will provide the data for the design processes.

  19. Self-service for software development projects and HPC activities

    NASA Astrophysics Data System (ADS)

    Husejko, M.; Høimyr, N.; Gonzalez, A.; Koloventzos, G.; Asbury, D.; Trzcinska, A.; Agtzidis, I.; Botrel, G.; Otto, J.

    2014-05-01

    This contribution describes how CERN has implemented several essential tools for agile software development processes, ranging from version control (Git) to issue tracking (Jira) and documentation (Wikis). Running such services in a large organisation like CERN requires many administrative actions both by users and service providers, such as creating software projects, managing access rights, users and groups, and performing tool-specific customisation. Dealing with these requests manually would be a time-consuming task. Another area of our CERN computing services that has required dedicated manual support has been clusters for specific user communities with special needs. Our aim is to move all our services to a layered approach, with server infrastructure running on the internal cloud computing infrastructure at CERN. This contribution illustrates how we plan to optimise the management of our of services by means of an end-user facing platform acting as a portal into all the related services for software projects, inspired by popular portals for open-source developments such as Sourceforge, GitHub and others. Furthermore, the contribution will discuss recent activities with tests and evaluations of High Performance Computing (HPC) applications on different hardware and software stacks, and plans to offer a dynamically scalable HPC service at CERN, based on affordable hardware.

  20. Management of a large distributed control system development project

    SciTech Connect

    Gurd, D. P.

    2002-01-01

    Building an accelerator at six geographically dispersed sites is quite mad, but politically expedient. The Spallation Neutron Source (SNS), currently under construction in Oak Ridge, Tennessee, combines a pulsed 1 Gev H{sup -} superconducting linac with a compressor ring to deliver 2 MW of beam power to a liquid mercury target for neutron production [1]. Accelerator components, target and experimental (neutron-scattering) instruments are being developed collaboratively by Lawrence Berkeley (Ion Source and Front End), Los Alamos (Linac), Thomas Jefferson (Cryosystems), Brookhaven (Compressor Ring), Oak Ridge (Target and Conventional Facilities) and Argonne (Neutron Scattering Instruments) National Laboratories. Similarly, a team distributed among all of the participating laboratories is developing the EPICS-based control system. this paper discusses the management model and strategies being used to address the unusual issues of organization, communication, standardization, integration and hand-off inherent in this widely-distributed project.

  1. Alfalfa variety development. Minnesota Agripower Project, Task II research report

    SciTech Connect

    Lamb, J.F.S.; Samac, D.A.; Sheaffer, C.C.

    1997-10-30

    This report briefly summarizes preliminary results from crossbreeding alfalfa to develop desirable characteristics for a dedicated biomass feed stock. The varieties development is part of a larger project which includes preparation and gasification of the alfalfa stems for energy production, and use of the co-product alfalfa leaves in livestock feed. The desired alfalfa traits include winter hardiness, resistance to major pathogens, resistance to foliar disease complexes, many thick, tall, solid, non-lodging stems with high lignin content, delayed flowering, and high quality leaves retained through harvest. Currently no alfalfa varieties meet these criteria. Three crosses were made using old European varieties, with thick stems, and modern resistant varieties. The crossbreeds showed some resistance to diseases, but increased resistance is needed to maximize leaf and steam yield. 1 tab.

  2. Development of Procedures for Assessing the Impact of Vocational Education Research and Development on Vocational Education (Project IMPACT). Volume 4--A Case Study of Illinois Projects in Horticulture.

    ERIC Educational Resources Information Center

    Hook, Colin; Ethridge, James

    As part of Project IMPACT's efforts to identify and develop procedures for complying with the impact requirements of Public Law 94-482, a case study was made of Illinois Projects in Horticulture. Fourteen horticulture projects in high schools and junior colleges were discovered through a previous study, personal interviews with two University of…

  3. Development of Procedures for Assessing the Impact of Vocational Education Research and Development on Vocational Education (Project IMPACT). Volume 4--A Case Study of Illinois Projects in Horticulture.

    ERIC Educational Resources Information Center

    Hook, Colin; Ethridge, James

    As part of Project IMPACT's efforts to identify and develop procedures for complying with the impact requirements of Public Law 94-482, a case study was made of Illinois Projects in Horticulture. Fourteen horticulture projects in high schools and junior colleges were discovered through a previous study, personal interviews with two University of…

  4. Texas LPG fuel cell development and demonstration project

    SciTech Connect

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units. For further

  5. Project Development Teams: A Novel Mechanism for Accelerating Translational Research

    PubMed Central

    Sajdyk, Tammy J.; Sors, Thomas G.; Hunt, Joe D.; Murray, Mary E.; Deford, Melanie E.; Shekhar, Anantha; Denne, Scott C.

    2014-01-01

    The trend in conducting successful biomedical research is shifting from individual academic labs to coordinated collaborative research teams. Teams of experienced investigators with a wide variety of expertise are now critical for developing and maintaining a successful, productive research program. However, assembling a team whose members have the right expertise requires a great deal of time and many resources. To assist investigators seeking such resources, the Indiana Clinical and Translational Sciences Institute (Indiana CTSI) created the Project Development Teams (PDTs) Program to support translational research on and across the Indiana University-Purdue University Indianapolis, Indiana University, Purdue University, and University of Notre Dame campuses. PDTs are multidisciplinary committees of seasoned researchers who assist investigators, at any stage of research, in transforming ideas/hypotheses into well-designed translational research projects. The teams help investigators capitalize on Indiana CTSI resources by providing investigators with, as needed, mentoring and career development; protocol development; pilot funding; institutional review board, regulatory, and/or nursing support; intellectual property support; access to institutional technology; and assistance with biostatistics, bioethics, recruiting participants, data mining, engaging community health, and collaborating with other investigators. Indiana CTSI leaders have analyzed metrics, collected since the inception of the PDT Program in 2008 from both investigators and team members, and found evidence strongly suggesting that the highly responsive teams have become an important one-stop venue for facilitating productive interactions between basic and clinical scientists across four campuses, have aided in advancing the careers of junior faculty, and have helped investigators successfully obtain external funds. PMID:25319172

  6. Project development teams: a novel mechanism for accelerating translational research.

    PubMed

    Sajdyk, Tammy J; Sors, Thomas G; Hunt, Joe D; Murray, Mary E; Deford, Melanie E; Shekhar, Anantha; Denne, Scott C

    2015-01-01

    The trend in conducting successful biomedical research is shifting from individual academic labs to coordinated collaborative research teams. Teams of experienced investigators with a wide variety of expertise are now critical for developing and maintaining a successful, productive research program. However, assembling a team whose members have the right expertise requires a great deal of time and many resources. To assist investigators seeking such resources, the Indiana Clinical and Translational Sciences Institute (Indiana CTSI) created the Project Development Teams (PDTs) program to support translational research on and across the Indiana University-Purdue University Indianapolis, Indiana University, Purdue University, and University of Notre Dame campuses. PDTs are multidisciplinary committees of seasoned researchers who assist investigators, at any stage of research, in transforming ideas/hypotheses into well-designed translational research projects. The teams help investigators capitalize on Indiana CTSI resources by providing investigators with, as needed, mentoring and career development; protocol development; pilot funding; institutional review board, regulatory, and/or nursing support; intellectual property support; access to institutional technology; and assistance with biostatistics, bioethics, recruiting participants, data mining, engaging community health, and collaborating with other investigators.Indiana CTSI leaders have analyzed metrics, collected since the inception of the PDT program in 2008 from both investigators and team members, and found evidence strongly suggesting that the highly responsive teams have become an important one-stop venue for facilitating productive interactions between basic and clinical scientists across four campuses, have aided in advancing the careers of junior faculty, and have helped investigators successfully obtain external funds.

  7. Project Report on Development of a Safeguards Approach for Pyroprocessing

    SciTech Connect

    Robert Bean

    2010-09-01

    The Idaho National Laboratory has undertaken an effort to develop a standard safeguards approach for international commercial pyroprocessing facilities. This report details progress for the fiscal year 2010 effort. A component by component diversion pathway analysis has been performed, and has led to insight on the mitigation needs and equipment development needed for a valid safeguards approach. The effort to develop an in-hot cell detection capability led to the digital cloud chamber, and more importantly, the significant potential scientific breakthrough of the inverse spectroscopy algorithm, including the ability to identify energy and spatial location of gamma ray emitting sources with a single, non-complex, stationary radiation detector system. Curium measurements were performed on historical and current samples at the FCF to attempt to determine the utility of using gross neutron counting for accountancy measurements. A solid cost estimate of equipment installation at FCF has been developed to guide proposals and cost allocations to use FCF as a test bed for safeguards measurement demonstrations. A combined MATLAB and MCNPX model has been developed to perform detector placement calculations around the electrorefiner. Early harvesting has occurred wherein the project team has been requested to provide pyroprocessing technology and safeguards short courses.

  8. DEVELOPING AND IMPLEMENTING AN ESTUARINE WATER QUALITY MONITORING, ASSESSMENT AND OUTREACH PROGRAM/THE MYSOUND PROJECT

    EPA Science Inventory

    EPA has developed a technology transfer handbook for the EMPACT MYSound Project. The handbook highlights information and monitoring technologies developed from the EMPACT Long Island Sound Marine Monitoring (MYSound) Project. As part of the MYSound effort, telemetering data-buoys...

  9. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    SciTech Connect

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-11-19

    This is the second technical report, covering the period from April 1, 2003 through September 30, 2003. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. The geo-technical component is a shared effort between the State Department of Administration and the US Department of Energy. The Alaska Oil and Gas Conservation Commission is rapidly converting high volumes of paper documents and geo-technical information to formats suitable for search and retrieval over the Internet. The permitting component is under the lead of the DNR Office of Project Management and Permitting. A web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information on-line. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. Structural changes are taking place in terms of organization, statutory authority, and regulatory requirements. Geographic Information Systems are a central component to the organization of information, and the delivery of on-line services. Progress has been made to deploy the foundation system for the shared GIS based on open GIS protocols to the extent feasible. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells.

  10. Sample Return Propulsion Technology Development Under NASA's ISPT Project

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Dankanich, John; Hahne, David; Pencil, Eric; Peterson, Todd; Munk, Michelle M.

    2011-01-01

    Abstract In 2009, the In-Space Propulsion Technology (ISPT) program was tasked to start development of propulsion technologies that would enable future sample return missions. Sample return missions can be quite varied, from collecting and bringing back samples of comets or asteroids, to soil, rocks, or atmosphere from planets or moons. As a result, ISPT s propulsion technology development needs are also broad, and include: 1) Sample Return Propulsion (SRP), 2) Planetary Ascent Vehicles (PAV), 3) Multi-mission technologies for Earth Entry Vehicles (MMEEV), and 4) Systems/mission analysis and tools that focuses on sample return propulsion. The SRP area includes electric propulsion for sample return and low cost Discovery-class missions, and propulsion systems for Earth Return Vehicles (ERV) including transfer stages to the destination. Initially the SRP effort will transition ongoing work on a High-Voltage Hall Accelerator (HIVHAC) thruster into developing a full HIVHAC system. SRP will also leverage recent lightweight propellant-tanks advancements and develop flight-qualified propellant tanks with direct applicability to the Mars Sample Return (MSR) mission and with general applicability to all future planetary spacecraft. ISPT s previous aerocapture efforts will merge with earlier Earth Entry Vehicles developments to form the starting point for the MMEEV effort. The first task under the Planetary Ascent Vehicles (PAV) effort is the development of a Mars Ascent Vehicle (MAV). The new MAV effort will leverage past MAV analysis and technology developments from the Mars Technology Program (MTP) and previous MSR studies. This paper will describe the state of ISPT project s propulsion technology development for future sample return missions.12

  11. NTRCI Legacy Engine Research and Development Project Final Technical Report

    SciTech Connect

    Smith-Holbert, Connie; Petrolino, Joseph; Watkins, Bart; Irick, David

    2011-12-31

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was

  12. Assessing human rights impacts in corporate development projects

    SciTech Connect

    Salcito, Kendyl; Utzinger, Jürg; Weiss, Mitchell G.; Münch, Anna K.; Singer, Burton H.; Krieger, Gary R.; Wielga, Mark

    2013-09-15

    Human rights impact assessment (HRIA) is a process for systematically identifying, predicting and responding to the potential impact on human rights of a business operation, capital project, government policy or trade agreement. Traditionally, it has been conducted as a desktop exercise to predict the effects of trade agreements and government policies on individuals and communities. In line with a growing call for multinational corporations to ensure they do not violate human rights in their activities, HRIA is increasingly incorporated into the standard suite of corporate development project impact assessments. In this context, the policy world's non-structured, desk-based approaches to HRIA are insufficient. Although a number of corporations have commissioned and conducted HRIA, no broadly accepted and validated assessment tool is currently available. The lack of standardisation has complicated efforts to evaluate the effectiveness of HRIA as a risk mitigation tool, and has caused confusion in the corporate world regarding company duties. Hence, clarification is needed. The objectives of this paper are (i) to describe an HRIA methodology, (ii) to provide a rationale for its components and design, and (iii) to illustrate implementation of HRIA using the methodology in two selected corporate development projects—a uranium mine in Malawi and a tree farm in Tanzania. We found that as a prognostic tool, HRIA could examine potential positive and negative human rights impacts and provide effective recommendations for mitigation. However, longer-term monitoring revealed that recommendations were unevenly implemented, dependent on market conditions and personnel movements. This instability in the approach to human rights suggests a need for on-going monitoring and surveillance. -- Highlights: • We developed a novel methodology for corporate human rights impact assessment. • We piloted the methodology on two corporate projects—a mine and a plantation. • Human

  13. EMSP project summary (Project ID: 60077): Development of nuclear analysis capabilities for DOE waste management activities

    SciTech Connect

    Parks, C.V.; Rearden, B.T.; DeHart, M.D.; Broadhead, B.L.; Hopper, C.M.; Petrie, L.M.

    2000-02-01

    The objective of this project is to develop and demonstrate prototypical analysis capabilities that can be used by nuclear safety analysis practitioners to: (1) demonstrate a more thorough understanding of the underlying physics phenomena that can lead to improved reliability and defensibility of safety evaluations; and (2) optimize operations related to the handling, storage, transportation, and disposal of fissile material and DOE spent fuel. To address these problems, this project has been investigating the implementation of sensitivity and uncertainty methods within existing Monte Carlo codes used for criticality safety analyses. It is also investigating the use of a new deterministic code that allows for specification of arbitrary grids to accurately model geometric details required in a criticality safety analysis. This capability can facilitate improved estimations of the required subcritical margin and potentially enable the use of a broader range of experiments in the validation process. The new arbitrary-grid radiation transport code will also enable detailed geometric modeling valuable for improved accuracy in application to a myriad of other problems related to waste characterization. Application to these problems will also be explored.

  14. EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement

    SciTech Connect

    Electric Research and Management, Inc.

    1997-03-11

    The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

  15. Present Status of the ILC Project and Development

    SciTech Connect

    Ross, M.; Walker, N.; Yamamoto, A.; /KEK, Tsukuba

    2011-09-01

    The Technical Design of the International Linear Collider (ILC) Project will be finished in late 2012. The Technical Design Report (TDR) will include a description of the updated design, with a cost estimate and a project plan, and the results of research and development (R & D) done in support of the ILC. Results from directed ILC R & D are used to reduce the cost and risk associated with the ILC design. We present a summary of key challenges and show how the global R & D effort has addressed them. The most important activity has been in pursuit of very high gradient superconducting RF linac technology. There has been excellent progress toward the goal of practical industrial production of niobium sheet-metal cavities with gradient performance in excess of 35 MV/m. In addition, three purpose-built beam test facilities have been constructed and used to study and demonstrate high current linac performance, electron-cloud beam dynamics and precision beam control. The report also includes a summary of component design studies and conventional facilities cost optimization design studies.

  16. Developing citizen science projects: Cut twigs for 'chilling' pupils

    NASA Astrophysics Data System (ADS)

    Menzel, Annette; Matiu, Michael; Laube, Julia

    2017-04-01

    Citizen science projects mainly involve two aims, science and education. Depending on the setting, either the data delivery part for answering questions raised by scientists or the educating part e.g. on scientific practices, crosscutting concepts, application of core science contents or awareness for environmental problems prevails. In this respect, spring phenology is a grateful topic because it addresses both aspects nearly symmetrically. In science, it remains unresolved which factors besides spring warming also trigger spring bud development, namely chilling / photoperiod / humidity / nutrient availability. The appearance of fresh leaves in spring has been fascinating for humans; it is linked to cultural heritage, festivals and has always attracted nature lovers, from young children to senior citizens. In our study, we set up a twig experiment to study the chilling effect on bud burst of Corylus avellana L. which was conducted by trained citizen scientists at their home. We asked the scientific question if the effects of chilling can be analysed by the twig method, and how sampling and experimental setting should be designed. Furthermore we tested if the twig method is feasible for citizen scientist projects, and report minimum requirements, successes and drawbacks.

  17. Software development infrastructure for the HYBRID modeling and simulation project

    SciTech Connect

    Aaron S. Epiney; Robert A. Kinoshita; Jong Suk Kim; Cristian Rabiti; M. Scott Greenwood

    2016-09-01

    One of the goals of the HYBRID modeling and simulation project is to assess the economic viability of hybrid systems in a market that contains renewable energy sources like wind. The idea is that it is possible for the nuclear plant to sell non-electric energy cushions, which absorb (at least partially) the volatility introduced by the renewable energy sources. This system is currently modeled in the Modelica programming language. To assess the economics of the system, an optimization procedure is trying to find the minimal cost of electricity production. The RAVEN code is used as a driver for the whole problem. It is assumed that at this stage, the HYBRID modeling and simulation framework can be classified as non-safety “research and development” software. The associated quality level is Quality Level 3 software. This imposes low requirements on quality control, testing and documentation. The quality level could change as the application development continues.Despite the low quality requirement level, a workflow for the HYBRID developers has been defined that include a coding standard and some documentation and testing requirements. The repository performs automated unit testing of contributed models. The automated testing is achieved via an open-source python script called BuildingsP from Lawrence Berkeley National Lab. BuildingsPy runs Modelica simulation tests using Dymola in an automated manner and generates and runs unit tests from Modelica scripts written by developers. In order to assure effective communication between the different national laboratories a biweekly videoconference has been set-up, where developers can report their progress and issues. In addition, periodic face-face meetings are organized intended to discuss high-level strategy decisions with management. A second means of communication is the developer email list. This is a list to which everybody can send emails that will be received by the collective of the developers and managers

  18. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    NASA Technical Reports Server (NTRS)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  19. Retrieval process development and enhancements project Fiscal year 1995: Simulant development technology task progress report

    SciTech Connect

    Golcar, G.R.; Bontha, J.R.; Darab, J.G.

    1997-01-01

    The mission of the Retrieval Process Development and Enhancements (RPD&E) project is to develop an understanding of retrieval processes, including emerging and existing technologies, gather data on these technologies, and relate the data to specific tank problems such that end-users have the requisite technical bases to make retrieval and closure decisions. The development of waste simulants is an integral part of this effort. The work of the RPD&E simulant-development task is described in this document. The key FY95 accomplishments of the RPD&E simulant-development task are summarized below.

  20. Development of an artificial multifunctional foot: A project review

    NASA Astrophysics Data System (ADS)

    Almeida, João; Ferreira, Maria José; Lobarinhas, Pedro; Silva, Luís F.; Leite, Abílio; Araújo, Alfredo; Sousa, Fernando

    2013-10-01

    The main purpose of this project is the development of a multifunctional artificial foot, capable of duplicate a human foot in a laboratory environment, in order to evaluate and simulate footwear's performance under certain conditions. This foot is used as a laboratory prototype and is multisegmented, in order that each section is controlled independently in terms of heat generation and sweating rate, therefore it is possible to simulate more accurately the real behaviour of a human foot. The device produces thermal insulation values that will help to design footwear with better ability in terms of thermal comfort, replacing human volunteers in thermal comfort perception tests, which are very subjective. The prototype was already tested, and preliminary results indicated that thermal insulation values are within the range of expected values produced by other foot thermal manikins and by human volunteers' tests. This fact suggests that this lab prototype can be used infuture thermal comfort evaluations.

  1. Hardware development and tests in the GIRL project

    NASA Astrophysics Data System (ADS)

    Dahl, F.; Klein, G.; Proetel, K.; Roemisch, N.

    The German Infrared Laboratory GIRL is a liquid helium-cooled telescope with four focal plane instruments dedicated to astronomical and aeronomical observations. Hardware tests were performed with a thermal model of the cryostat and other components as active phase separator, optical switches, main mirror, baffle etc. In the test phase the thermal behavior of the system was checked out in a step by step procedure. The timeline of the individual experiments and of two representative orbits were simulated by electrical heaters. Temperatures and helium flow rates for the different operation modes were measured. An outlook shows that the project phase in 1982 is dedicated to further development and tests of hardware and complete definition and specification of all GIRL systems.

  2. Development of the Decontamination Approach for the West Valley Demonstration Project Decontamination Project Plan

    SciTech Connect

    Milner, T. N.; Watters, W. T.

    2002-02-25

    This paper details the development of a decontamination approach for the West Valley Demonstration Project (WVDP), Decontamination Project Plan (Plan). The WVDP is operated by West Valley Nuclear Services Company (WVNSCO), a subsidiary of Westinghouse Government and Environmental Services, and its parent companies Washington Group International and British Nuclear Fuels Limited (BNFL). The WVDP is a waste management effort being conducted by the United States Department of Energy (DOE) at the site of the only commercial nuclear fuel reprocessing facility to have operated in the United States. This facility is part of the Western New York Nuclear Service Center (WNYNSC), which is owned by the New York State Energy Research and Development Authority (NYSERDA). As authorized by Congress in 1980 through the West Valley Demonstration Project Act (WVDP Act, Public Law 96-368), the DOE's primary mission at the WVDP is to solidify high-level liquid nuclear waste safely; transport the high-level waste (HLW) to a federal repository; and decontaminate and decommission the facilities and hardware used to solidify the HLW and conduct the WVDP. This includes a provision for the disposal of low-level waste (LLW) and transuranic waste (TRU) produced during processing of the HLW. Continuation of the effort to reduce the hazard and risk associated with historic operations to the extent needed to ensure the health and safety of the public and the environment will see a change in focus from stabilization of liquid HLW to stabilization of former plutonium and uranium extraction (PUREX) reprocessing plant facilities. This will be achieved through the activities of in-cell component removal and packaging, and preparation for long-term disposal of the long- lived radionuclides. These radionuclides are associated with the former PUREX facility operations, including, and upstream from, facilities utilized in the primary separation and first plutonium/uranium split cycles. The closure

  3. 49 CFR 611.7 - Relation to planning and project development processes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... under section 5309 for construction of a new start project, FTA will negotiate an FFGA with the grantee...) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION MAJOR CAPITAL INVESTMENT PROJECTS § 611.7 Relation to planning and project development processes. All new start projects proposed for funding...

  4. 31 CFR 500.576 - Authorization of transactions concerning certain development projects in Vietnam.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... debit to a blocked account. Example: A Vietnamese highway project feasibility study financed by a third... feasibility study would be a Qualified Project, notwithstanding the bilateral funding, if the International... development projects in Vietnam that are bilaterally funded and administered, or in projects or...

  5. Examining the Dynamics of Managing Information Systems Development Projects: A Control Loss Perspective

    ERIC Educational Resources Information Center

    Narayanaswamy, Ravi

    2009-01-01

    The failure rate of information systems development (ISD) projects continues to pose a big challenge for organizations. The success rate of ISD projects is less then forty percent. Factors such as disagreements and miscommunications among project manager and team members, poor monitoring and intermediary problems contribute to project failure.…

  6. Examining the Dynamics of Managing Information Systems Development Projects: A Control Loss Perspective

    ERIC Educational Resources Information Center

    Narayanaswamy, Ravi

    2009-01-01

    The failure rate of information systems development (ISD) projects continues to pose a big challenge for organizations. The success rate of ISD projects is less then forty percent. Factors such as disagreements and miscommunications among project manager and team members, poor monitoring and intermediary problems contribute to project failure.…

  7. Workshop Report: Distributive Education Project Development Workshop. (Wisconsin Univ., Madison, July 30-August 11, 1967).

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. School of Education.

    This report of a 2-week workshop contains four papers presented by their authors, eight business presentations, and 1 group and 24 individual projects developed by the workshop participants. The papers pertain to project evaluation, project information, project training and distributive programs. The business presentations relate to new products,…

  8. Overview and Summary of the Advanced Mirror Technology Development Project

    NASA Astrophysics Data System (ADS)

    Stahl, H. P.

    2014-01-01

    Advanced Mirror Technology Development (AMTD) is a NASA Strategic Astrophysics Technology project to mature to TRL-6 the critical technologies needed to produce 4-m or larger flight-qualified UVOIR mirrors by 2018 so that a viable mission can be considered by the 2020 Decadal Review. The developed mirror technology must enable missions capable of both general astrophysics & ultra-high contrast observations of exoplanets. Just as JWST’s architecture was driven by launch vehicle, a future UVOIR mission’s architectures (monolithic, segmented or interferometric) will depend on capacities of future launch vehicles (and budget). Since we cannot predict the future, we must prepare for all potential futures. Therefore, to provide the science community with options, we are pursuing multiple technology paths. AMTD uses a science-driven systems engineering approach. We derived engineering specifications for potential future monolithic or segmented space telescopes based on science needs and implement constraints. And we are maturing six inter-linked critical technologies to enable potential future large aperture UVOIR space telescope: 1) Large-Aperture, Low Areal Density, High Stiffness Mirrors, 2) Support Systems, 3) Mid/High Spatial Frequency Figure Error, 4) Segment Edges, 5) Segment-to-Segment Gap Phasing, and 6) Integrated Model Validation Science Advisory Team and a Systems Engineering Team. We are maturing all six technologies simultaneously because all are required to make a primary mirror assembly (PMA); and, it is the PMA’s on-orbit performance which determines science return. PMA stiffness depends on substrate and support stiffness. Ability to cost-effectively eliminate mid/high spatial figure errors and polishing edges depends on substrate stiffness. On-orbit thermal and mechanical performance depends on substrate stiffness, the coefficient of thermal expansion (CTE) and thermal mass. And, segment-to-segment phasing depends on substrate & structure stiffness

  9. The Effect of Values on System Development Project Outcomes

    DTIC Science & Technology

    2009-03-01

    117 ix Page PROJECT NAME: NASA Near Earth Asteroid Rendezvous (NEAR) ......................122 PROJECT NAME: Skunk Works...projects included “five missions to Mars, one mission to the moon, three space telescopes, two comet and asteroid rendezvous, four Earth-orbiting satellites...revolve around fear , trust, control and organizational values, not any inherent mathematical, technical or financial flaw in the FBC reasoning

  10. The Supervisor in the Project-Organized Group Work Should Participate in Developing the Students' Project Competencies

    ERIC Educational Resources Information Center

    Hansen, Soren

    2004-01-01

    Most work done by engineers today is organized in projects and very often as teamwork. When educating towards employability, it is therefore important that the students develop competencies in areas such as project management, collaboration and teamwork. In companies using human resource management, we find similar expectations to the engineers'…

  11. Education for Rural Development: The Case of the UPCA/BNE Barrio Development School Project.

    ERIC Educational Resources Information Center

    Contado, Tito E.

    The Barrio Development School, a 4-year action-research project which has been in operation for 2 years, is located at Masaya, Bay, Laguna, Philippines. Begun by the University of the Philippines, College of Agriculture, and the Board of National Education, it is a secondary school program for barrio youths who have decided to stay, live, and work…

  12. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  13. Development of the University of Delaware Experimental Watershed Project

    NASA Astrophysics Data System (ADS)

    Campagnini, J. L.; Kauffman, G. J.; Corrozi, M.; Bower, J.

    2001-05-01

    In 2000, a team of University of Delaware undergraduate and graduate students developed the University of Delaware Experimental Watershed Project with a grant from the Delaware Water Resources Center. The University of Delaware (UD) is a land- and sea-grant institution in Newark, Delaware and is perched along the Atlantic seaboard's fall line. A critical mass of UD faculty and students in water resources and related disciplines are interested in the development of an experimental watershed on campus to provide (1) interdisciplinary undergraduate, graduate and faculty research opportunities, and (2) an outdoor education laboratory. Using GIS and field reconnaissance techniques, the three students delineated two small experimental watershed regions respectively located in the Piedmont and Coastal Plain provinces of the White Clay Creek Wild and Scenic River Valley on the UD campus. The Piedmont watershed drains 416 acres of the northern area of campus while the Coastal Plain watershed drains 896 acres including the central and southern sections of campus. The students then developed an ArcView GIS atlas integrating geology, soils, topography, land use, and impervious cover layers with a rating system for water quality and habitat characteristics to issue a "report-card" assessing each watershed's overall health. The White Clay Creek Wild and Scenic River Valley is an ideal on campus location for an outdoor education and research laboratory because of its manageable scale, the diversity of its characteristic land uses and physical environment, and above all its accessibility for students, faculty, researchers, and the public.

  14. Concept Development of the Eindhoven Diabetes Education Simulator Project.

    PubMed

    Maas, Anne H; van der Molen, Pieta; van de Vijver, Reinier; Chen, Wei; van Pul, Carola; Cottaar, Eduardus J E; van Riel, Natal A W; Hilbers, Peter A J; Haak, Harm R

    2016-04-01

    This study was designed to define the concept of an educational diabetes game following a user-centered design approach. The concept development of the Eindhoven Diabetes Education Simulator (E-DES) project can be divided in two phases: concept generation and concept evaluation. Four concepts were designed by the multidisciplinary development team based on the outcomes of user interviews. Four other concepts resulted from the Diabetes Game Jam. Several users and experts evaluated the concepts. These user evaluations and a feasibility analysis served as input for an overall evaluation and discussion by the development team resulting in the final concept choice. The four concepts of the development team are a digital board game, a quiz platform, a lifestyle simulator, and a puzzle game. The Diabetes Game Jam resulted in another digital board game, two mobile swipe games, and a fairy tale-themed adventure game. The combined user evaluations and feasibility analysis ranked the quiz platform and the digital board game equally high. Each of these games fits one specific subgroup of users best: the quiz platform best fits an eager-to-learn, more individualistic patient, whereas the board game best fits a less-eager-to-learn, family-oriented patient. The choice for a specific concept is therefore highly dependent on the choice of our specific target audience. The user-centered design approach with multiple evaluations has enabled us to choose the most promising concept from eight different options. A digital board game is chosen for further development because the target audience for E-DES is the less-motivated, family-oriented patients.

  15. Development of On and Off retinal pathways and retinogeniculate projections.

    PubMed

    Chalupa, Leo M; Günhan, Emine

    2004-01-01

    A fundamental functional feature of the visual system, one recognized in the very first electrophysiological retinal recordings ever made, is that some cells respond to light increments (On cells) while others are activated by light decrements (Off cells). The circuitry underlying On and Off responses in the mature retina have been well-established. In particular, it is known that the dendrites of On- and Off-center retinal ganglion cells (RGCs) stratify in different sublamina of the inner plexiform layer (IPL), where they are innervated by spatially segregated On- and Off-cone bipolar cell inputs. Also, segregated into On and Off sublaminae of the IPL are the processes of starburst amacrine cells. In some species (notably ferret and mink) the retinogeniculate projections are also segregated into sublayers of the dorsal lateral geniculate nucleus (dlgn). The mature organizational features summarized above arise gradually during the course of normal development. Thus, the dendrites of immature RGCs initially ramify throughout the IPL before becoming stratified into On or Off sublamina. This developmental event is regulated by the release of glutamate by developing bipolar cells. Treating the developing retina with the glutamate analog 2-amino-4-phosphonobutyric acid (APB) has been found to prevent the stratification of RGC dendrites. In the mature retina APB binds with mGluR6 receptors expressed by On cone and rod bipolar cells which hyperpolarizes these retinal interneurons and blocks their release of glutamate. The effects of short-term APB treatment are reversible by subsequent normal visual experience, while those of long-term treatment appear to be permanent. At the time that developing RGCs are multistratified they respond to both light onset as well as light offset, suggesting that these neurons are initially functionally innervated by On as well as Off-cone bipolar cells. In the dark-adapted state, On-Off responses of immature multistratified RGCs are

  16. Health Impact Assessment of Indira Sagar Project: a paramount to studies on Water Development Projects.

    PubMed

    Anushrita; Nagpal, B N; Kapoor, Neera; Srivastava, Aruna; Saxena, Rekha; Singh, Shailendra; Gupta, Sanjeev; Singh, Sompal; Vikram, Kumar; Valecha, Neena

    2017-01-26

    Very limited studies on Health Impact Assessment (HIA) of Water Development Projects (WDP) in relation to mosquito-borne diseases have been carried out in India. The current study focuses on using HIA as a tool for finding impact of Indira Sagar Project, Madhya Pradesh on human health in relation to mosquito borne diseases, and emphasizing its incorporation as an integral part of any WDP. Screening, scoping, assessment, recommendation, reporting, and evaluation were carried out in selected study areas. Entomological, epidemiological, socio-economic and knowledge, attitudes and practices data related to malaria transmission in three dam components: Submergence (SUB), Command (CMD) and Resettlement and Rehabilitation (RR) colonies were generated for the period of January 2013-December 2014. Statistical analysis was attempted to compare data among dam components and to identify risk factors. Component-specific mitigation measures were suggested based on observations. Anopheles culicifacies was the dominating species in all three dam components and its man-hour density in CMD areas was higher compared to SUB and RR. The odds of finding a positive malaria case was much higher in CMD compared to SUB (OR 1.24, CI 95% 0.71-2.43) and RR (OR 5.48, CI 95% 0.73-40.63). Respondents of CMD stated more previous episodes of malaria (81.8%) compared to RR (61.4%) and SUB (55.7%). The canonical discriminant analysis concluded that distance from reservoir/Indira Sagar canal had the highest discriminating ability of malaria cases in different components followed by treatment-seeking behaviour and malaria history. The analysis identified these risk factors with 70% accuracy. Engineering manipulations may be carried out in CMD areas to control seepage and RR colonies should be established beyond 3 km from reservoir/Indira Sagar canal considering the flight range of A. culicifacies. Strengthening of surveillance with early detection and complete treatment was recommended for CMD areas

  17. A development of projecting operators technique in AGW theory

    NASA Astrophysics Data System (ADS)

    Leble, Sergey; Perelomova, Anna

    2013-04-01

    This paper develops the ideas of [1] in a spirit of recent realization [2] in which main attention is paid to acoustics and entropy mode co-existence and energetics. Now we include internal waves, having in mind general problem of geophysical hydrodynamics, neglecting Earth rotation terms (for the terms account possibility see [1]). The relations connecting perturbations specific for gravity, acoustic and entropy modes in a fluid affected by constant mass force, are derived. They allow to decompose the total vector of perturbations "a" and the overall energy into acoustic, gravity and non-wave (zero frequency) parts uniquely at any instant. In order to do this, five quantities are required, for example total perturbations in entropy, pressure and velocity vector. The corresponding projecting operators P(i), i=1,2,3,4,5 allow to specify the contributions (gravity, acoustic and entropy modes) in local measurements of the total perturbations, providing a geophysical diagnostics. Measurements of the basic parameters perturbations field may be also decomposed into the modes and, therefore, the problem of initialization is solved. Such operators are built as integral ones by aid of Fourier transformation either in space for initial problem or in space-time for a boundary problem. The method allows direct applications to problems with external sources vector "f" by the following scheme. The linearized basic equation of geophysical hydrodynamics of the form da/dt-La=f is decomposed by application of the projecting operators P(i) that commute with the evolution operator "L" by definition, hence (d/dt-L)P(i)a=P(i)f. Such form is equivalent to a variables change (substitution a=(P(1)+...+P(5))a) which is one-to-one map because the set of projecting operators is complete P(1)+...+P(5)=I. The technique is applied to nonlinear models in similar way: (d/dt-L)P(i) a=P(i)N(a), where N(a) are nonlinear terms of the basic system [1]. An important problem of energy balance in the

  18. Native Fish Sanctuary Project - Sanctuary Development Phase, 2007 Annual Report

    USGS Publications Warehouse

    Mueller, Gordon A.

    2007-01-01

    Notable progress was made in 2007 toward the development of native fish facilities in the Lower Colorado River Basin. More than a dozen facilities are, or soon will be, online to benefit native fish. When this study began in 2005 no self-supporting communities of either bonytail or razorback sucker existed. Razorback suckers were removed from Rock Tank in 1997 and the communities at High Levee Pond had been compromised by largemouth bass in 2004. This project reversed that trend with the establishment of the Davis Cove native fish community in 2005. Bonytail and razorback sucker successfully produced young in Davis Cove in 2006. Bonytail successfully produced young in Parker Dam Pond in 2007, representing the first successful sanctuary established solely for bonytail. This past year, Three Fingers Lake received 135 large razorback suckers, and Federal and State agencies have agreed to develop a cooperative management approach dedicating a portion of that lake toward grow-out and (or) the establishment of another sanctuary. Two ponds at River's Edge Golf Course in Needles, California, were renovated in June and soon will be stocked with bonytail. Similar activities are taking place at Mohave Community College, Cerbat Cliffs Golf Course, Cibola High Levee Pond, Office Cove, Emerald Canyon Golf Course, and Bulkhead Cove. Recruitment can be expected as fish become sexually mature at these facilities. Flood-plain facilities have the potential to support 6,000 adult razorback suckers and nearly 20,000 bonytail if native fish management is aggressively pursued. This sanctuary project has assisted agencies in developing 15 native fish communities by identifying specific resource objectives for those sites, listing and prioritizing research opportunities and needs, and strategizing on management approaches through the use of resource-management plans. Such documents have been developed for Davis Cove, Cibola High Levee Pond, Parker Dam Pond, and Three Fingers Lake. We

  19. Final Project Summary Report Bechtel Nevada and Fiberchem Environmental, Inc., Cooperative Research and Technology Development Project

    SciTech Connect

    R. J. Pollina

    1999-04-01

    This is a report summarizing work on a small project dedicated to adapting a new chemical sensing platform for the US Department of Energy and its customers. At the same time and in the spirit of technology transfer, FCI Environmental, Inc., would receive technical support in the form of expertise from the US Department of Energy to assist in developing this product. The sensor is a hybrid integrated-circuit, optical waveguide, chemical sensor that is patented by FCI Environmental, Inc., and manufactured under license by Texas Instruments, Inc. A down-hole penetrometer probe was designed for use in hot, 60 C, hydrocarbon-saturated, saline environment at a depth of 200 feet. The probe design includes three chemical sensing, hybrid integrated-circuits with chemical reference and measurement channels, a water seal, output electronics, and a removable measurement head for replacement in the field. A hand-held chemical detector prototype--containing a hybrid integrated-circuit chemical sensor with reference channel, user alarm, and level display--was designed and constructed, and a software interface developed to operate the hand-held sensor interfaced with a laboratory data acquisition system.

  20. New projects developed by COMOTI in gas industry

    NASA Astrophysics Data System (ADS)

    Nitulescu, Marian; Silivestru, Valentin; Toma, Niculae; Slujitoru, Cristian; Petrescu, Valentin; Leahu, Mihai; Oniga, Ciprian; Ulici, Gheorghe

    2015-08-01

    The paper aims to present two new projects developed by the Romanian Research and Development Institute for Gas Turbines (COMOTI) in partnership with City University of London and GHH-Rand Germany, in the field of screw compressors/expanders. COMOTI passed, in recent years, from being a GHH-Rand licensed manufacturer for a range of oil-injected screw compressors, of CU type, to a new phase of range diversification, approaching screw compressors with a maximum discharge pressure of 45 bara. So, in cooperation with City University and GHH-Rand we design, manufacture and test, with air, in COMOTI test bench the new type of screw compressor named CHP 220. Also, the cooperation with GHH-Rand has resulted in the design, manufacture and air testing on the test bench, and then gas testing - in a gas compression station - for an electric generator driven by a screw expander. This paper presents how the tests were carried out, the experimental data and the interpretation of results

  1. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    SciTech Connect

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  2. NASA GRC UAS Project - Communications Modeling and Simulation Development Status

    NASA Technical Reports Server (NTRS)

    Apaza, Rafael; Bretmersky, Steven; Dailey, Justin; Satapathy, Goutam; Ditzenberger, David; Ye, Chris; Kubat, Greg; Chevalier, Christine; Nguyen, Thanh

    2014-01-01

    The integration of Unmanned Aircraft Systems (UAS) in the National Airspace represents new operational concepts required in civil aviation. These new concepts are evolving as the nation moves toward the Next Generation Air Transportation System (NextGen) under the leadership of the Joint Planning and Development Office (JPDO), and through ongoing work by the Federal Aviation Administration (FAA). The desire and ability to fly UAS in the National Air Space (NAS) in the near term has increased dramatically, and this multi-agency effort to develop and implement a national plan to successfully address the challenges of UAS access to the NAS in a safe and timely manner is well underway. As part of the effort to integrate UAS in the National Airspace, NASA Glenn Research Center is currently involved with providing research into Communications systems and Communication system operations in order to assist with developing requirements for this implementation. In order to provide data and information regarding communication systems performance that will be necessary, NASA GRC is tasked with developing and executing plans for simulations of candidate future UAS command and control communications, in line with architectures and communications technologies being developed and or proposed by NASA and relevant aviation organizations (in particular, RTCA SC-203). The simulations and related analyses will provide insight into the ability of proposed communications technologies and system architectures to enable safe operation of UAS, meeting UAS in the NAS project goals (including performance requirements, scalability, and interoperability), and ultimately leading to a determination of the ability of NextGen communication systems to accommodate UAS. This presentation, compiled by the NASA GRC Modeling and Simulation team, will provide an update to this ongoing effort at NASA GRC as follow-up to the overview of the planned simulation effort presented at ICNS in 2013. The objective

  3. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  4. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  5. Writing Project Professional Development Continues to Yield Gains in Student Writing Achievement. Research Brief No. 2

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2010

    2010-01-01

    The National Writing Project (NWP) has expanded its national portfolio of research projects conducted at local Writing Project sites to 16 studies that examine professional development, teacher practices, and student writing achievement. NWP sites emphasize common principles of high-quality instruction and the professional development necessary to…

  6. Management and Development of the Western Resources Project

    SciTech Connect

    Terry Brown

    2009-03-09

    The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

  7. Developments of next generation of seafloor observatories in MARsite project

    NASA Astrophysics Data System (ADS)

    Italiano, Francesco; Favali, Paolo; Zaffuto, Alfonso; Zora, Marco; D'Anca, Fabio

    2015-04-01

    The development of new generation of autonomous sea-floor observatories is among the aims of the EC supersite project MARsite (MARMARA Supersite; FP7 EC-funded project, grant n° 308417). An approach based on multiparameter seafloor observatories is considered of basic importance to better understand the role of the fluids in an active tectonic system and their behaviour during the development of the seismogenesis. To continuously collect geochemical and geophysical data from the immediate vicinity of the submerged North Anatolian Fault Zone (NAFZ) is one of the possibilities to contribute to the seismic hazard minimization of the Marmara area. The planning of next generation of seafloor observatories for geo-hazard monitoring is a task in one of the MARsite Work Packages (WP8). The activity is carried out combining together either the experience got after years of investigating fluids and their interactions with the seafloor and tectonic structures and the long-term experience on the development and management of permanent seafloor observatories in the main frame of the EMSO (European Multidisciplinary Seafloor and water-column Observatory, www.emso-eu.org) Research Infrastructure. The new generation of seafloor observatories have to support the observation of both slow and quick variations, thus allow collecting low and high-frequency signals besides the storage of long-term dataset and/or enable the near-real-time mode data transmission. Improvements of some the seafloor equipments have been done so far within MARsite project in terms of the amount of contemporary active instruments, their interlink with "smart sensor" capacities (threshold detection, triggering), quality of the collected data and power consumption reduction. In order to power the multiparameter sensors the digitizer and the microprocessor, an electronic board named PMS (Power Management System) with multi-master, multi-slave, single-ended, serial bus Inter-Integrated Circuit (I²C) interface

  8. Decisive management in selecting locations for development of construction projects

    NASA Astrophysics Data System (ADS)

    Szafranko, E.; Pawłowicz, J. A.

    2017-08-01

    The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.

  9. WB/GEF Renewable Energy Development Project: Renewable Energy in China

    SciTech Connect

    Not Available

    2004-04-01

    Fact sheet describes China's Renewable Energy Development Project to supply electricity to rural households and institutions with wind energy and solar power (photovoltaics). World Bank and Global Environmental Facility fund the project.

  10. From Training to Technical Assistance in Professional Development: The Stories of Project CREATE and Project INSITE

    ERIC Educational Resources Information Center

    Buell, Martha Jane; Adams, Jennifer; Rutherford, Whitney; Radnai-Griffin, Dorit

    2006-01-01

    The authors of this article describe two model programs aimed at improving the quality of infant and toddler child care in the state of Delaware. Project CREATE provided college-level coursework to classroom teachers. Project INSITE provided technical assistance to child care centers that was customized to meet the needs of the individual program.…

  11. Statistical Literacy: Developing a Youth and Adult Education Statistical Project

    ERIC Educational Resources Information Center

    Conti, Keli Cristina; Lucchesi de Carvalho, Dione

    2014-01-01

    This article focuses on the notion of literacy--general and statistical--in the analysis of data from a fieldwork research project carried out as part of a master's degree that investigated the teaching and learning of statistics in adult education mathematics classes. We describe the statistical context of the project that involved the…

  12. Research and Development Project in Career Education. [Pennsylvania]. Final Report.

    ERIC Educational Resources Information Center

    Struck, John W.; Curtis, Carroll A.

    The report covers career education activities at four Pennsylvania project sites (Ebensberg, Crawford County, Philadelphia, and McKeesport): an elementary, a junior high, a K-12, and a 10-14 component. Project TIMES (Temporally Individualized Modular Education Scheduling) was incorporated in the 10-14 component at an area vocational-technical…

  13. Transmedia Teaching Framework: From Group Projects to Curriculum Development

    ERIC Educational Resources Information Center

    Reid, James; Gilardi, Filippo

    2016-01-01

    This paper describes an innovative project-based learning framework theoretically based on the ideas of Transmedia Storytelling, Participatory Cultures and Multiple intelligences that can be integrated into the f?lipped classroom method, and practically addressed using Content- Based Instruction (CBI) and Project-Based Learning (PBL) approaches.…

  14. Learning through Service: Developing an Intergenerational Project to Engage Students

    ERIC Educational Resources Information Center

    Fiebig, Jennifer Nepper

    2014-01-01

    Educational institutions are increasingly encouraging faculty to design classroom projects that take learning outside the ivory tower and into the real world. An emphasis is placed on engaging both students and community partners in a mutually beneficial project that fosters a life-long commitment to actively helping the community and people in…

  15. Continuing Development of California State Packet Radio Project.

    ERIC Educational Resources Information Center

    Brownrigg, Edwin

    1992-01-01

    Provides background on the California State Library Packet Radio project, which will use packet radios to deploy a wireless, high-speed, wide-area network of 600 nodes, including 100 libraries, in the San Francisco Bay Area. Project goals and objectives, plan of operation, equipment, and evaluation plans are summarized. (MES)

  16. Developing Counseling Students' Multicultural Competence through the Multicultural Action Project

    ERIC Educational Resources Information Center

    Hipolito-Delgado, Carlos P.; Cook, Jennifer M.; Avrus, Elaine M.; Bonham, Erica J.

    2011-01-01

    The Multicultural Action Project (MAP) is a cultural immersion project that requires counseling students to engage with diverse cultural communities on 3 levels: observation, information seeking, and action. To ascertain if participating in MAP improved the multicultural competence of graduate counseling students, the authors conducted an…

  17. Statistical Literacy: Developing a Youth and Adult Education Statistical Project

    ERIC Educational Resources Information Center

    Conti, Keli Cristina; Lucchesi de Carvalho, Dione

    2014-01-01

    This article focuses on the notion of literacy--general and statistical--in the analysis of data from a fieldwork research project carried out as part of a master's degree that investigated the teaching and learning of statistics in adult education mathematics classes. We describe the statistical context of the project that involved the…

  18. Boundary Spanning in Offshored Information Systems Development Projects

    ERIC Educational Resources Information Center

    Krishnan, Poornima

    2010-01-01

    Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…

  19. Competencies of Leaders and Managers in Educational Research and Development. Independent Research and Development Project Reports. Report No. 4.

    ERIC Educational Resources Information Center

    DeAnda, Natividad

    This report clarifies pilot efforts which address new problem areas in educational needs. The project was initiated to determine the specific competencies essential to the management of educational projects in research and development. The goals of the project were to establish a profile of identified competencies for use in planning the content…

  20. Oil Stop Valve : Oil Spill Containment Research and Development Project.

    SciTech Connect

    Bourn, Robert D.

    1982-07-01

    This report summarizes the research and development project conducted by the Civil Engineering Section, Division of Substation and Control Engineering, to determine the effectiveness of the oil stop valve for use in the Bonneville Power Administration's Oil Spill Containment and Countermeasure Program. The most attractive alternative to lagoons and separator tanks was found in the oil stop valve manufactured by AFL/Clark Industries of Riviera Beach, Florida. This small, direct-acting and relatively inexpensive valve requires little maintenance and can either be employed independently, using existing drain lines for effluent storage, or in conjunction with oil separator tanks and lagoon systems. The AFL/Clark valve requires no power and has only one moving part, a ballasted float having a specific gravity between that of oil and water. In water, the float rides above the throat of the discharge pipe allowing water to flow out. When oil enters the water the float begins losing its relative bouyancy and sinks until it seats itself over the throat of the outlet, closing the valve. Usually installed in a manhole within a typical storm drainage system, the valve backs spilled oil into drainways and contains it for temporary storage within the switchyard.

  1. Experimental and theoretical developments in the Mochi project

    NASA Astrophysics Data System (ADS)

    You, Setthivoine; von der Linden, Jens; Vereen, Keon; Lavine, Eric Sander; Carroll, Evan; Card, Alexander; Azuara-Rosales, Manuel; Quinley, Morgan; Yun, Gunsu

    2015-11-01

    The Mochi project investigates the interaction between magnetic fields and plasma flows in cylindrical and toroidal geometries. The configuration is designed to tailor the radial electric field profile with three annular electrodes and allow for shear helical flows in magnetized plasma jets or merging spheromaks. First plasma has been achieved and characterization is in progress with images, magnetic probes, an energy analyzer, an interferometer, a fast ion gauge, and optical and RF spectroscopy. Vector tomography of ion Doppler spectroscopy is progressing with the design of the custom fiber bundle and implementation of the numerical code. The first experiments are investigating the coupling of sausage and kink instabilities, comparing measurements to a new stability criterion and a numerical stability code. A new canonical field theory has been developed to help interpret the dynamics of plasma self-organization. The theory augments the Lagrangian of general dynamical systems to rigourously demonstrate that canonical helicity transport is valid across single particle, kinetic and fluid regimes, that dynamical equations can be re-formulated as a form of Maxwell's equations, and that helicity is conserved only when density gradients are shallow. This work is supported by US DOE Grant DE-SC0010340.

  2. Developing ecospheres on transiently habitable planets: the genesis project

    NASA Astrophysics Data System (ADS)

    Gros, Claudius

    2016-10-01

    It is often presumed, that life evolves relatively fast on planets with clement conditions, at least in its basic forms, and that extended periods of habitability are subsequently needed for the evolution of higher life forms. Many planets are however expected to be only transiently habitable. On a large set of otherwise suitable planets life will therefore just not have the time to develop on its own to a complexity level as it did arise on earth with the cambrian explosion. The equivalent of a cambrian explosion may however have the chance to unfold on transiently habitable planets if it would be possible to fast forward evolution by 3-4 billion years (with respect to terrestrial timescales). We argue here, that this is indeed possible when seeding the candidate planet with the microbial lifeforms, bacteria and unicellular eukaryotes alike, characterizing earth before the cambrian explosion. An interstellar mission of this kind, denoted the `Genesis project', could be carried out by a relatively low-cost robotic microcraft equipped with a on-board gene laboratory for the in situ synthesis of the microbes.

  3. Infrastructure for Planetary Sciences: Universal planetary database development project

    NASA Astrophysics Data System (ADS)

    Kasaba, Yasumasa; Capria, M. T.; Crichton, D.; Zender, J.; Beebe, R.

    The International Planetary Data Alliance (IPDA), formally formed under COSPAR (Formal start: from the COSPAR 2008 at Montreal), is a joint international effort to enable global access and exchange of high quality planetary science data, and to establish archive stan-dards that make it easier to share the data across international boundaries. In 2008-2009, thanks to the many players from several agencies and institutions, we got fruitful results in 6 projects: (1) Inter-operable Planetary Data Access Protocol (PDAP) implementations [led by J. Salgado@ESA], (2) Small bodies interoperability [led by I. Shinohara@JAXA N. Hirata@U. Aizu], (3) PDAP assessment [led by Y. Yamamoto@JAXA], (4) Architecture and standards definition [led by D. Crichton@NASA], (5) Information model and data dictionary [led by S. Hughes@NASA], and (6) Venus Express Interoperability [led by N. Chanover@NMSU]. 'IPDA 2009-2010' is important, especially because the NASA/PDS system reformation is now reviewed as it develops for application at the international level. IPDA is the gate for the establishment of the future infrastructure. We are running 8 projects: (1) IPDA Assessment of PDS4 Data Standards [led by S. Hughes (NASA/JPL)], (2) IPDA Archive Guide [led by M.T. Capria (IASF/INAF) and D. Heather (ESA/PSA)], (3) IPDA Standards Identification [led by E. Rye (NASA/PDS) and G. Krishna (ISRO)], (4) Ancillary Data Standards [led by C. Acton (NASA/JPL)], (5) IPDA Registries Definition [led by D. Crichton (NASA/JPL)], (6) PDAP Specification [led by J. Salgado (ESA/PSA) and Y. Yamamoto (JAXA)], (7) In-teroperability Assessment [R. Beebe (NMSU) and D. Heather (ESA/PSA)], and (8) PDAP Geographic Information System (GIS) extension [N. Hirata (Univ. Aizu) and T. Hare (USGS: thare@usgs.gov)]. This paper presents our achievements and plans summarized in the IPDA 5th Steering Com-mittee meeting at DLR in July 2010. We are now just the gate for the establishment of the Infrastructure.

  4. Genetic Programming as Alternative for Predicting Development Effort of Individual Software Projects

    PubMed Central

    Chavoya, Arturo; Lopez-Martin, Cuauhtemoc; Andalon-Garcia, Irma R.; Meda-Campaña, M. E.

    2012-01-01

    Statistical and genetic programming techniques have been used to predict the software development effort of large software projects. In this paper, a genetic programming model was used for predicting the effort required in individually developed projects. Accuracy obtained from a genetic programming model was compared against one generated from the application of a statistical regression model. A sample of 219 projects developed by 71 practitioners was used for generating the two models, whereas another sample of 130 projects developed by 38 practitioners was used for validating them. The models used two kinds of lines of code as well as programming language experience as independent variables. Accuracy results from the model obtained with genetic programming suggest that it could be used to predict the software development effort of individual projects when these projects have been developed in a disciplined manner within a development-controlled environment. PMID:23226305

  5. Genetic programming as alternative for predicting development effort of individual software projects.

    PubMed

    Chavoya, Arturo; Lopez-Martin, Cuauhtemoc; Andalon-Garcia, Irma R; Meda-Campaña, M E

    2012-01-01

    Statistical and genetic programming techniques have been used to predict the software development effort of large software projects. In this paper, a genetic programming model was used for predicting the effort required in individually developed projects. Accuracy obtained from a genetic programming model was compared against one generated from the application of a statistical regression model. A sample of 219 projects developed by 71 practitioners was used for generating the two models, whereas another sample of 130 projects developed by 38 practitioners was used for validating them. The models used two kinds of lines of code as well as programming language experience as independent variables. Accuracy results from the model obtained with genetic programming suggest that it could be used to predict the software development effort of individual projects when these projects have been developed in a disciplined manner within a development-controlled environment.

  6. Tracking and data systems support for the Helios project. Volume 1: Project development through end of mission, phase 2

    NASA Technical Reports Server (NTRS)

    Goodwin, P. S.; Traxler, M. R.; Meeks, W. G.; Flanagan, F. M.

    1976-01-01

    The overall evolution of the Helios Project is summarized from its conception through to the completion of the Helios-1 mission phase 2. Beginning with the project objectives and concluding with the Helios-1 spacecraft entering its first superior conjunction (end of mission phase 2), descriptions of the project, the mission and its phases, international management and interfaces, and Deep Space Network-spacecraft engineering development in telemetry, tracking, and command systems to ensure compatibility between the U.S. Deep Space Network and the German-built spacecraft are included.

  7. 18 CFR 2.7 - Recreational development at licensed projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... these needs, including those for sport fishing and hunting. (d) To encourage governmental agencies and... project area. (f)(1) To comply with Federal, State and local regulations for health, sanitation, and...

  8. 18 CFR 2.7 - Recreational development at licensed projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... these needs, including those for sport fishing and hunting. (d) To encourage governmental agencies and... project area. (f)(1) To comply with Federal, State and local regulations for health, sanitation, and...

  9. 18 CFR 2.7 - Recreational development at licensed projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... these needs, including those for sport fishing and hunting. (d) To encourage governmental agencies and... project area. (f)(1) To comply with Federal, State and local regulations for health, sanitation, and...

  10. 18 CFR 2.7 - Recreational development at licensed projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... these needs, including those for sport fishing and hunting. (d) To encourage governmental agencies and... project area. (f)(1) To comply with Federal, State and local regulations for health, sanitation, and...

  11. 18 CFR 2.7 - Recreational development at licensed projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... these needs, including those for sport fishing and hunting. (d) To encourage governmental agencies and... project area. (f)(1) To comply with Federal, State and local regulations for health, sanitation, and...

  12. Geothermal Energy Research and Development Program; Project Summaries

    SciTech Connect

    1994-03-01

    This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

  13. Curriculum Alignment Projects: Toward Developing a Need To Know.

    ERIC Educational Resources Information Center

    Pinkerton, K. David

    2001-01-01

    Describes the Curriculum Alignment Projects (CAPs) with the example of Bicarbonate Squeeze Play, which is an 18-week curriculum. Describes the three important outcomes of the CAPs; motivation, achievement, and teaching. Includes 16 references. (YDS)

  14. Raising the Bar: Challenging Students in a Capstone Project Course with an Android and Mobile Web Parallel Development Team Project

    ERIC Educational Resources Information Center

    Wong, Wilson; Pepe, James; Englander, Irv

    Information systems capstone projects aim to prepare students for what they will encounter in the industry after graduation. Corporate application development is often a complex endeavor that requires coordination between related products. For example, software development in the mobile application sector may require a coordinated parallel…

  15. Faculty development projects for international health professions educators: Vehicles for institutional change?

    PubMed

    Burdick, William P; Friedman, Stacey R; Diserens, Deborah

    2012-01-01

    Projects are an important tool in faculty development, and project emphasis may offer insights into perceived education priorities. Impact of projects has been focused on individuals, not institutions or health. Education innovation projects of Fellows in an international faculty development program were examined to better understand perceived needs in health professions education and institutional impact of projects. Four hundred and thirty-five projects were analyzed to identify focus areas. Fellows were asked to identify changes in their schools and communities resulting from their projects. New education methods and curriculum change were common project focus areas. Regional differences were evident with a higher percentage of education methods projects by Fellows residing in India (52%), compared with South Africa (25%) and Brazil (24%). Fifty-six percent of projects were incorporated into the curriculum and/or incorporated as institutional policy. One-third to two-thirds of respondents noted improved teaching quality, collaboration, education research interest, assessment, student performance, and curriculum alignment with community health needs. National differences in project focus may offer insight into local conditions and needs. High rates of diffusion of projects and impact on faculty, students, and curriculum suggest that faculty development projects may be a strategy for institutional change in resource limited environments.

  16. Instrument development in the Italy-USA Collaborative Spectrum Project.

    PubMed

    Rucci, P; Maser, J D

    2000-01-01

    The Collaborative Spectrum Project aims to define subthreshold and atyical conditions not sufficiently characterized in the current diagnostic nomenclature and for which adequate assessment instruments are not available. This paper reports on the development and validation of new instruments to assess the spectrum of five psychiatric disorders. Three multicenter studies and one single-site study were conducted in Italy to assess the validity and reliability of the five spectrum interviews. Another cross-sectional study to validate the panic-agoraphobia spectrum has been conducted in Pittsburgh. Outpatients attending various university clinics, university students and, in one Italian study, gym attenders were recruited for the studies. Five structured clinical interview to assess the spectrum of panic-agoraphobia (SCI-PAS), mood (SCI-MOODS), social phobia (SCI-SHY), and the obsessive-compulsive (SCI-OBS) and eating disorder spectra (SCI-ABS) were administered along with a diagnostic interview and a number of self-report and interviewer-rated instruments. All the domains of the interview showed high test-retest reliability (intraclass correlation coefficient > 0.61) and satisfactory internal consistency. Mean domain scores were significantly higher in cases than in controls and in patients with the disorder of interest than in patients with other disorders. Convergent validity was satisfactory for panic-agoraphobia, social phobia and obsessive-compulsive spectrum domains. Differences emerged between SCI-ABS and self-report instruments assessing eating disorders. A cut-off score for the panic-agoraphobia spectrum was defined and its clinical validity was tested. The psychometric properties of the five spectrum interviews are very satisfactory, and studies are currently ongoing to test the clinical validity of all the spectra. Subthreshold and atypical symptoms deserve attention in epidemiological investigation.

  17. Success Rates by Software Development Methodology in Information Technology Project Management: A Quantitative Analysis

    ERIC Educational Resources Information Center

    Wright, Gerald P.

    2013-01-01

    Despite over half a century of Project Management research, project success rates are still too low. Organizations spend a tremendous amount of valuable resources on Information Technology projects and seek to maximize the utility gained from their efforts. The author investigated the impact of software development methodology choice on ten…

  18. Success Rates by Software Development Methodology in Information Technology Project Management: A Quantitative Analysis

    ERIC Educational Resources Information Center

    Wright, Gerald P.

    2013-01-01

    Despite over half a century of Project Management research, project success rates are still too low. Organizations spend a tremendous amount of valuable resources on Information Technology projects and seek to maximize the utility gained from their efforts. The author investigated the impact of software development methodology choice on ten…

  19. Developing Communities of Practice around e-Learning and Project Management

    ERIC Educational Resources Information Center

    Laxton, Ruth; Applebee, Andrelyn Cheryl

    2010-01-01

    In 2007-8 the Australian Catholic University (ACU National), undertook a project to develop new resources to provide training and support in eLearning for staff and students. The project was undertaken by a multidisciplinary team drawn from all six campuses and was led by an externally contracted Project Manager/eLearning specialist. This…

  20. Selected Research and Extension Projects of the Four Regional Rural Development Centers. 1993 Combined Report.

    ERIC Educational Resources Information Center

    North Central Regional Center for Rural Development, Ames, IA.

    The four Regional Rural Development Centers are linked to the land-grant institutions and engage in activities and projects that seek to improve the social and economic well-being of rural people. This combined report of the four Centers begins with a highlighted project from each Center. The projects are presented in some detail to provide…

  1. Youth Development Project: First Year Evaluation Report [1984-85]. Report No. 321.

    ERIC Educational Resources Information Center

    Hawaii Univ., Manoa. Youth Development & Research Center.

    The Youth Development Project is a school-based delinquency prevention project which incorporates intervention strategies of social skills training, student team learning, and community liaison between home and school. Subjects in the project are fourth, fifth, and sixth graders of one experimental (N=315) and one comparison (N=196) elementary…

  2. JPL - Small Power Systems Applications Project. [for solar thermal power plant development and commercialization

    NASA Technical Reports Server (NTRS)

    Ferber, R. R.; Marriott, A. T.; Truscello, V.

    1978-01-01

    The Small Power Systems Applications (SPSA) Project has been established to develop and commercialize small solar thermal power plants. The technologies of interest include all distributed and central receiver technologies which are potentially economically viable in power plant sizes of one to 10 MWe. The paper presents an overview of the SPSA Project and briefly discusses electric utility involvement in the Project.

  3. A Directory of Research and Curriculum Development Projects in Social Science Education.

    ERIC Educational Resources Information Center

    Lester, Sid; And Others

    This directory is designed as a reference for the educator on the activities of the new social studies research and curriculum development projects. It is not an analysis or an evaluation; it merely reports the information supplied by the 100 various projects --name, director, address, purpose, grade, subject, and products. These projects cover…

  4. JPL - Small Power Systems Applications Project. [for solar thermal power plant development and commercialization

    NASA Technical Reports Server (NTRS)

    Ferber, R. R.; Marriott, A. T.; Truscello, V.

    1978-01-01

    The Small Power Systems Applications (SPSA) Project has been established to develop and commercialize small solar thermal power plants. The technologies of interest include all distributed and central receiver technologies which are potentially economically viable in power plant sizes of one to 10 MWe. The paper presents an overview of the SPSA Project and briefly discusses electric utility involvement in the Project.

  5. 49 CFR 611.7 - Relation to planning and project development processes.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... is an eligible part of the proposed project for funding purposes. (6) This part does not in any way... 49 Transportation 7 2012-10-01 2012-10-01 false Relation to planning and project development...) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION MAJOR CAPITAL INVESTMENT PROJECTS § 611.7...

  6. Intersections: A Professional Development Project in Multicultural and Global Education, Asian and Asian American Studies.

    ERIC Educational Resources Information Center

    Swartz, Leslie, Ed.; Warner, Linda, Ed.; Grossman, David L., Ed.

    This publication presents a sampling of the writings of participants in the Intersections Project, a professional development program to bridge gap between multicultural and global education for urban schools that involved four participating entities, each with a local project that focused on Asia and Asian Americans. The project was specifically…

  7. TOPEX Project Radar Altimeter Development Requirements and Specifications, Version 6.0

    NASA Technical Reports Server (NTRS)

    Rossi, Laurence C.

    2003-01-01

    This document provides the guidelines by which the TOPEX Radar Altimeter hardware development effort for the TOPEX flight project shall be implemented and conducted. The conduct of this activity shall take maximum advantage of the efforts expended during the TOPEX Radar Altimeter Advanced Technology Model development program and other related Radar Altimeter development efforts. This document complies with the TOPEX Project Office document 633-420 (D-2218), entitled, "TOPEX Project Requirements and Constraints for the NASA Radar Altimeter" dated December 1987.

  8. Engagement and Mentor Support as Drivers of Social Development in the Project K Youth Development Program.

    PubMed

    Chapman, Cassandra M; Deane, Kelsey L; Harré, Niki; Courtney, Matthew G R; Moore, Julie

    2017-03-01

    Youth development programs can achieve positive social outcomes, however studies comparing the influence of different program components are rare. Structural equation modeling of longitudinal, multilevel data (N = 327) from Project K, a multi-component youth development program, assessed how experiences of engagement or support in each component affected social outcomes. Participants reported significant gains in social self-efficacy and sense of community after the program. Engagement in the outdoor adventure and support during the mentoring partnership components significantly contributed to observed social gains, while engagement in the community service component did not. Results confirm youth development programs can positively influence adolescent social development, while highlighting the importance of moving beyond "black box" investigations in order to maximize program impact and efficiency.

  9. Project CREW: A Novel Approach Linking Career Counseling to Workforce Development

    ERIC Educational Resources Information Center

    Haynes, Ray K.; Johnson, Nichola D.

    2005-01-01

    The purpose of this paper is to present Project CREW--a novel and innovative collaborative career counseling program that links educational attainment and skills development to community-based workforce development. A review of the literature on career development is provided along with a discussion of how Project CREW's model and program theory…

  10. Canada's International Development Research Centre's eco-health projects with Latin Americans: origins, development and challenges.

    PubMed

    Cole, Donald C; Crissman, Charles C; Orozco, A Fadya

    2006-01-01

    Since its founding in 1970, Canada's International Development Research Centre (IDRC) has supported research by concerned Latin American researchers on environments and human health relationships. Framing of such relationships has changed through different periods. Participant observation, bibliographic searches, document review, and interviews with key IDRC staff. From the early years of multiple different projects, IDRC developed more focussed interest in tropical diseases, pesticides, agriculture and human health in the 1980s. The United Nations Conference on Sustainable Development in the early 1990s gave impetus to examination of links between ecosystems and human health or "EcoHealth". Projects in Latin America built on earlier work but extended it in methods (transdisciplinarity, community participation, gendered approach) and scope (broader land use and development paradigm issues tackled). A key IDRC-funded activity in Latin America was "EcoSalud", an Ecuadorian effort, which has worked with farming communities, agricultural researchers, health practitioners and local politicians to advance integrated pest management, better recognize and treat poisonings and improve pesticide-related policies. ONGOING CHALLENGES INCLUDE: mobilizing sufficient resources for the primary prevention focus of EcoHealth activities when primary care infrastructure remains stretched, promoting micro-level change in diverse communities and ecosystems, and addressing power structures at the global level that profoundly affect environmental change.

  11. The Development of an Instrument to Measure the Project Competences of College Students in Online Project-Based Learning

    NASA Astrophysics Data System (ADS)

    Lin, Chien-Liang

    2017-07-01

    This study sought to develop a self-report instrument to be used in the assessment of the project competences of college students engaged in online project-based learning. Three scales of the KIPSSE instrument developed for this study, namely, the knowledge integration, project skills, and self-efficacy scales, were based on related theories and the analysis results of three project advisor interviews. Those items of knowledge integration and project skill scales focused on the integration of different disciplines and technological skills separately. Two samples of data were collected from information technology-related courses taught with an online project-based learning strategy over different semesters at a college in southern Taiwan. The validity and reliability of the KIPSSE instrument were confirmed through item analysis and confirmatory factor analysis using structural equation modeling of two samples of students' online response sets separately. The Cronbach's alpha reliability coefficient for the entire instrument was 0.931; for each scale, the alpha ranged from 0.832 to 0.907. There was also a significant correlation (r = 0.55, p < 0.01) between the KIPSSE instrument results and the students' product evaluation scores. The findings of this study confirmed the validity and reliability of the KIPSSE instrument. The confirmation process and related implications are also discussed.

  12. Curriculum Alignment Projects: Toward Developing a Need to Know

    NASA Astrophysics Data System (ADS)

    Pinkerton, K. David

    2001-02-01

    This study investigated means of designing a high school chemistry curriculum. A Curriculum Alignment Project (CAP) was used to coordinate one semester (18 weeks) of activities. CAPs are long-term, multiple-approach design and construction projects that provide students a concrete task to accomplish, rather than an abstract theme to appreciate. Topics were selected for their potential contribution to students' success on the CAP, not because the topics were coming up next in a textbook. One particular CAP, Bicarbonate Squeeze Play, is described in detail. After one cycle of CAPs, student motivation began to change from extrinsic to intrinsic; achievement on objective measures was holding steady; students' abilities to craft and carry out long-term plans for complex projects were improving; and the teacher was learning how to design curriculum that fostered students' need to know.

  13. Workshop to develop deep-life continental scientific drilling projects

    SciTech Connect

    Kieft, T. L.; Onstott, T. C.; Ahonen, L.; Aloisi, V.; Colwell, F. S.; Engelen, B.; Fendrihan, S.; Gaidos, E.; Harms, U.; Head, I.; Kallmeyer, J.; Kiel Reese, B.; Lin, L.-H.; Long, P. E.; Moser, D. P.; Mills, H.; Sar, P.; Schulze-Makuch, D.; Stan-Lotter, H.; Wagner, D.; Wang, P.-L.; Westall, F.; Wilkins, M. J.

    2015-05-29

    The International Continental Scientific Drilling Program (ICDP) has long espoused studies of deep subsurface life, and has targeted fundamental questions regarding subsurface life, including the following: "(1) What is the extent and diversity of deep microbial life and what are the factors limiting it? (2) What are the types of metabolism/carbon/energy sources and the rates of subsurface activity? (3) How is deep microbial life adapted to subsurface conditions? (4) How do subsurface microbial communities affect energy resources? And (5) how does the deep biosphere interact with the geosphere and atmosphere?" (Horsfield et al., 2014) Many ICDP-sponsored drilling projects have included a deep-life component; however, to date, not one project has been driven by deep-life goals, in part because geomicrobiologists have been slow to initiate deep biosphere-driven ICDP projects. Therefore, the Deep Carbon Observatory (DCO) recently partnered with the ICDP to sponsor a workshop with the specific aim of gathering potential proponents for deep-life-driven ICDP projects and ideas for candidate drilling sites. Twenty-two participants from nine countries proposed projects and sites that included compressional and extensional tectonic environments, evaporites, hydrocarbon-rich shales, flood basalts, Precambrian shield rocks, subglacial and subpermafrost environments, active volcano–tectonic systems, megafan deltas, and serpentinizing ultramafic environments. The criteria and requirements for successful ICDP applications were presented. Deep-life-specific technical requirements were discussed and it was concluded that, while these procedures require adequate planning, they are entirely compatible with the sampling needs of other disciplines. As a result of this workshop, one drilling workshop proposal on the Basin and Range Physiographic Province (BRPP) has been submitted to the ICDP, and several other drilling project proponents plan to submit proposals for ICDP

  14. Workshop to develop deep-life continental scientific drilling projects

    DOE PAGES

    Kieft, T. L.; Onstott, T. C.; Ahonen, L.; ...

    2015-05-29

    The International Continental Scientific Drilling Program (ICDP) has long espoused studies of deep subsurface life, and has targeted fundamental questions regarding subsurface life, including the following: "(1) What is the extent and diversity of deep microbial life and what are the factors limiting it? (2) What are the types of metabolism/carbon/energy sources and the rates of subsurface activity? (3) How is deep microbial life adapted to subsurface conditions? (4) How do subsurface microbial communities affect energy resources? And (5) how does the deep biosphere interact with the geosphere and atmosphere?" (Horsfield et al., 2014) Many ICDP-sponsored drilling projects have includedmore » a deep-life component; however, to date, not one project has been driven by deep-life goals, in part because geomicrobiologists have been slow to initiate deep biosphere-driven ICDP projects. Therefore, the Deep Carbon Observatory (DCO) recently partnered with the ICDP to sponsor a workshop with the specific aim of gathering potential proponents for deep-life-driven ICDP projects and ideas for candidate drilling sites. Twenty-two participants from nine countries proposed projects and sites that included compressional and extensional tectonic environments, evaporites, hydrocarbon-rich shales, flood basalts, Precambrian shield rocks, subglacial and subpermafrost environments, active volcano–tectonic systems, megafan deltas, and serpentinizing ultramafic environments. The criteria and requirements for successful ICDP applications were presented. Deep-life-specific technical requirements were discussed and it was concluded that, while these procedures require adequate planning, they are entirely compatible with the sampling needs of other disciplines. As a result of this workshop, one drilling workshop proposal on the Basin and Range Physiographic Province (BRPP) has been submitted to the ICDP, and several other drilling project proponents plan to submit proposals for ICDP

  15. Workshop to develop deep-life continental scientific drilling projects

    NASA Astrophysics Data System (ADS)

    Kieft, T. L.; Onstott, T. C.; Ahonen, L.; Aloisi, V.; Colwell, F. S.; Engelen, B.; Fendrihan, S.; Gaidos, E.; Harms, U.; Head, I.; Kallmeyer, J.; Kiel Reese, B.; Lin, L.-H.; Long, P. E.; Moser, D. P.; Mills, H.; Sar, P.; Schulze-Makuch, D.; Stan-Lotter, H.; Wagner, D.; Wang, P.-L.; Westall, F.; Wilkins, M. J.

    2015-05-01

    The International Continental Scientific Drilling Program (ICDP) has long espoused studies of deep subsurface life, and has targeted fundamental questions regarding subsurface life, including the following: "(1) What is the extent and diversity of deep microbial life and what are the factors limiting it? (2) What are the types of metabolism/carbon/energy sources and the rates of subsurface activity? (3) How is deep microbial life adapted to subsurface conditions? (4) How do subsurface microbial communities affect energy resources? And (5) how does the deep biosphere interact with the geosphere and atmosphere?" (Horsfield et al., 2014) Many ICDP-sponsored drilling projects have included a deep-life component; however, to date, not one project has been driven by deep-life goals, in part because geomicrobiologists have been slow to initiate deep biosphere-driven ICDP projects. Therefore, the Deep Carbon Observatory (DCO) recently partnered with the ICDP to sponsor a workshop with the specific aim of gathering potential proponents for deep-life-driven ICDP projects and ideas for candidate drilling sites. Twenty-two participants from nine countries proposed projects and sites that included compressional and extensional tectonic environments, evaporites, hydrocarbon-rich shales, flood basalts, Precambrian shield rocks, subglacial and subpermafrost environments, active volcano-tectonic systems, megafan deltas, and serpentinizing ultramafic environments. The criteria and requirements for successful ICDP applications were presented. Deep-life-specific technical requirements were discussed and it was concluded that, while these procedures require adequate planning, they are entirely compatible with the sampling needs of other disciplines. As a result of this workshop, one drilling workshop proposal on the Basin and Range Physiographic Province (BRPP) has been submitted to the ICDP, and several other drilling project proponents plan to submit proposals for ICDP

  16. The Development of Project Orion Ground Safety Requirements

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul; Condzella, Bill; Williams, Jeff

    2011-01-01

    In spite of a very compressed schedule, Project Orion's AFT safety team was able to pull together a comprehensive set of ground safety requirements using existing requirements and subject matter experts. These requirements will serve as the basis for the design of GSE and ground operations. Using the above lessons as a roadmap, new Projects can produce the same results. A rigorous set of ground safety requirements is required to assure ground support equipment (GSE) and associated flight hardware ground operations are conducted safety

  17. Empowering women: participatory approaches in women's health and development projects.

    PubMed

    Manderson, L; Mark, T

    1997-01-01

    The authors describe the experience of NGOs (nongovernmental organizations) and community-based organizations in implementing projects aimed at improving women's health. The study included 16 projects, reflecting Australian NGO experiences in Africa, China, Southeast Asia, the Pacific, and South America. They illustrate the value of participatory approaches in determining needs and priorities, and the value of the continued involvement of women in implementation, monitoring, and evaluation. Approaches that succeeded in increasing women's access to and use of health services addressed gender issues, set realistic and achievable objectives, and recognized and enhanced the roles and status of women.

  18. Projects at the Component Development and Integration Facility. Quarterly technical progress report, July 1--September 30, 1993

    SciTech Connect

    Not Available

    1993-12-31

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the first quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept project; mine waste technology pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  19. Projects at the Component Development and Integration Facility. Quarterly technical progress report, April 1--June 30, 1993

    SciTech Connect

    Not Available

    1993-12-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project; and Spray Casting Project.

  20. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect

    Not Available

    1994-08-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  1. Projects at the Component Development and Integration Facility. Quarterly technical progress report, October 1--December 31, 1992

    SciTech Connect

    Not Available

    1992-12-31

    This quarterly technical progress report presents progress on the projects at the component Development and Integration Facility (CDIF) during the first quarter of FY93. The CDIF is a major US Department of Energy (DOE) test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD proof-of-concept project; mine waste pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  2. Environmental Education Project for Developing Supersphere Characters in Children's Books

    NASA Astrophysics Data System (ADS)

    Vasconcelos, G. F.

    2014-12-01

    To raise awareness and provide basic knowledge about the environment, three children's books have been created to explain, in a simplified language, the basic processes of formation of the Earth, the origin of the universe, the planets and the moon, volcanism, rock formation and the appearance of water, the earliest life forms and their evolution and the main elements of Earth. These phenomena are represented through the main characters who are super heroes or designated Superspheres, such as Hydrosphere (water), Lithosphere (rocks), Biosphere (Polite, a stromatolite and Sarite, the mineral dolomite), Atmosphere (air), which are the 4 components of the Earth System, and the Pyrosphere(fire), which supplies the energy to drive the Earth System through volcanic activity. The characters have each developed super powers that evolved over geological time as they are transformed. They are the basic elements of nature and appear in a specific chronological order. With the emergence of ancient life in the seas, the Biosphere begins to use the energy of the sun, through of the photosynthetic activity of stromatolites, one of the friends of the superheroes, to produce the oxygen for the Atmosphere. Over a vast period of time, the evolution of life continues with the formation of the supercontinent Gondwana. With the arrival of man and his interaction with the Earth, the villain appears in the book as the "Homo incorrectus" (incorrect man), who abuses and tries to destroy the super heroes, the "Superspheres". The importance of these characters for the living Earth is emphasized, creating a connection between children and the characters. The aim of the story is to create a greater ecological conscience in the children and showing them that they should be helping to save the "Superspheres", who are in danger and need to be preserved. Projects for primary schools in the State of Rio de Janeiro have been designed and implemented around these characters, focusing on the rescue of

  3. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  4. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  5. Final report for the DOE Suede Project, (solar utilization/economic development and employment project)

    SciTech Connect

    Katz, G.; Zahigian, E. Jr.

    1983-10-19

    The purpose of this solar energy project was to design, manufacture, install, maintain and evaluate solar heating systems in order to stimulate community acceptance of the practicality of solar applications, reduce non-renewable energy resource consumption, and decrease residential expenditures for energy. The project also provided skill training and experience for CETA employees in the design, manufacture, and installation of solar energy equipment systems. CDC's contract had four separate solar energy projects; namely: Domestic Water Heating Systems for four Single-Family Homes; Domestic Water Heating for an industrial building; Domestic Water Heating for a (4) unit apartment complex (includes (12) supplemental space heating units); and Integral Passive Water Heaters and Energy Conservation Devices for (8) one bedroom homes. CDC staff designed all solar systems and CETA trainees (County and City vocational training program enrollees) under staff guidance manufactured, installed, and maintained all the solar energy systems. This report describes each of the energy projects and explains the design, manufacture and installation of each system. Each system is evaluated on the basis of energy savings, aquisition and maintenance costs, operation, service requirements and reliability.

  6. Learning Outcomes in Higher Education. A Development Project Report.

    ERIC Educational Resources Information Center

    Otter, Sue

    A project tested the feasibility of describing learning outcomes in adult/continuing education in ways that could be more clearly understood by three major groups of people--students, teachers, and employers of graduates--and how these could be assessed and accredited. Academic staff explored four different approaches to describing learning…

  7. The Cornelius Project: Program Designs for Total Child Development.

    ERIC Educational Resources Information Center

    Charlotte-Mecklenburg Public Schools, Charlotte, NC.

    This paper represents a first year evaluation of an innovative educational program instituted in 1976 in the Cornelius Elementary School, Charlotte, North Carolina. Designed as an attempt to meet children's developmental learning needs the project represents an attempt to put the developmental theories of Piaget, Bruner and other psychologists…

  8. Illinois Early Learning Project Tip Sheets: Physical Development and Health.

    ERIC Educational Resources Information Center

    2003

    The Illinois Early Learning Project (IEL) is funded by the Illinois State Board of Education to provide information resources on early learning and training related to implementing the Illinois Early Learning Standards for parents and for early childhood personnel in all settings. The IEL tip sheets offer suggestions to parents and early childhood…

  9. Hereford Hospital: a 65 m Pounds PFI development project.

    PubMed

    2002-08-01

    The new 340-bed acute general hospital at Hereford is one of a growing number of innovative PFI healthcare projects where Sodexho is a leading consortium member. The company is an equity partner with a 30-year contract to provide support services.

  10. A Chemistry Laboratory Project to Develop Thinking and Writing Skills.

    ERIC Educational Resources Information Center

    Goodman, W. Daniel; Bean, John C.

    1983-01-01

    Describes a method for conducting a sophomore organic chemistry laboratory which included integrating projects with a writing task involving peer group interaction. Also includes background/theory, chemistry tasks, writing tasks, and evaluation. Included in appendices are an analytic worksheet and grading scale. (JN)

  11. Projected Attachments and Self-Concept Development during Adolescence.

    ERIC Educational Resources Information Center

    Adams-Price, Carolyn; Greene, A. L.

    Incorporating Elkind's (1979) construct of the personal fable, this investigation focused on the relationship between self-concept and projected attachments to a distant object (i.e., a favorite celebrity). In a repeated measures design, 79 male and female 5th, 8th, and 11th graders and college sophomores completed a set of personality scales,…

  12. Developing Instructional Technology Products Using Effective Project Management Practices

    ERIC Educational Resources Information Center

    Allen, Stephanie; Hardin, Paul C.

    2008-01-01

    Delivering a successful instructional technology (IT) product depends on more than just having an extremely creative instructional solution or following an instructional systems design (ISD) model. Proper planning, direction, and execution of the project are require, as well. We present a model of management that encompasses the ISD process. Five…

  13. Illinois Early Learning Project Tip Sheets: Social and Emotional Development.

    ERIC Educational Resources Information Center

    2003

    The Illinois Early Learning Project (IEL) is funded by the Illinois State Board of Education to provide information resources on early learning and training related to implementing the Illinois Early Learning Standards for parents and for early childhood personnel in all settings. The IEL tip sheets offer suggestions to parents and early childhood…

  14. Teaching Interested Clinicians How to Develop Research Projects

    ERIC Educational Resources Information Center

    Wojtecki, Cindy A.; Wade, Michael J.; Pato, Michele T.

    2007-01-01

    Objective: The authors discuss teaching clinicians about research by generating projects from clinical practice, expertise, and interest. Method: Classes were co-taught by the hospital biostatistician and clinical nurse specialist in consultation with one of the authors. Hospital clinicians were taught how to initiate and design their study as a…

  15. Career Development for Young Indigenous People: A Project Summary

    ERIC Educational Resources Information Center

    Lichtenberg, Anna; Smith, Helen

    2009-01-01

    A range of career challenges and employment barriers confronting Indigenous people in Australia have been identified by census data and government reports. This paper describes a project that involved national consultation to determine the type of career programs and resources being used with Indigenous populations. Information was gathered with…

  16. An Approach to Developing the Laboratory Through Senior Design Projects.

    ERIC Educational Resources Information Center

    Faghri, Amir

    1987-01-01

    Describes a program in which senior engineering students are given the opportunity to design, make, and test apparatus intended for an upper-level teaching laboratory. Discusses such projects as a vapor compressor test stand with refrigerant mass flow measurement, a double-walled concentric annular heat pipe, and a vacuum filling station. (TW)

  17. The Great Learning Enterprise of the Four Worlds Development Project.

    ERIC Educational Resources Information Center

    Fiordo, Richard

    1988-01-01

    Describes a holistic Native Studies curriculum for ethnically mixed classes, based on a project to eliminate Native substance abuse through traditional Native values. Discusses teaching strategies using Native and non-Native learning styles, teacher as role model, and use of appropriate cultural-symbol graphics to transmit ideas. Contains 24…

  18. The Future of Work. Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Center for New Work of Flint, MI.

    The Future of Work project grew out of an essay of the same title by Frithjof Bergmann, a philosophy professor at the University of Michigan. In spring 1983, Professor Bergmann and a colleague, Richard Gull, founded the Center for New Work of Flint in Michigan, where the problems besieging the U.S. auto industry were focusing attention on the…

  19. Latvia School Library & Information Services Development. Project Two.

    ERIC Educational Resources Information Center

    Brown, Gerald R.

    This series of seminars and meetings was designed to build on the success of the Pilot Project 2000 carried out in collaboration with NORDINFO (Nordic Council for Scientific Information) and the University of Latvia. It was structured to provide four dimensions: visits to schools and District Resource Centers to provide background material to the…

  20. An Approach to Developing the Laboratory Through Senior Design Projects.

    ERIC Educational Resources Information Center

    Faghri, Amir

    1987-01-01

    Describes a program in which senior engineering students are given the opportunity to design, make, and test apparatus intended for an upper-level teaching laboratory. Discusses such projects as a vapor compressor test stand with refrigerant mass flow measurement, a double-walled concentric annular heat pipe, and a vacuum filling station. (TW)

  1. Developing Instructional Technology Products Using Effective Project Management Practices

    ERIC Educational Resources Information Center

    Allen, Stephanie; Hardin, Paul C.

    2008-01-01

    Delivering a successful instructional technology (IT) product depends on more than just having an extremely creative instructional solution or following an instructional systems design (ISD) model. Proper planning, direction, and execution of the project are require, as well. We present a model of management that encompasses the ISD process. Five…

  2. The Future of Work. Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Center for New Work of Flint, MI.

    The Future of Work project grew out of an essay of the same title by Frithjof Bergmann, a philosophy professor at the University of Michigan. In spring 1983, Professor Bergmann and a colleague, Richard Gull, founded the Center for New Work of Flint in Michigan, where the problems besieging the U.S. auto industry were focusing attention on the…

  3. Service-Learning Projects Developed from Institutional Research Questions

    ERIC Educational Resources Information Center

    Zack, Maria; Crow, Greg

    2013-01-01

    Institutional research questions provide an excellent source of interesting problems for service-learning projects for undergraduates in mathematics. This paper discusses how this model has been implemented at Point Loma Nazarene University and provides both examples and practical details. (Contains 6 figures.)

  4. The Project Method: Its Vocational Education Origin and International Development.

    ERIC Educational Resources Information Center

    Knoll, Michael

    1997-01-01

    Traces the history of the project as a teaching method from the art academies of Renaissance Rome and Paris to European and U.S. technical universities, manual training and industrial arts, and the influence of Kilpatrick and Dewey in the early 20th century. (SK)

  5. Student Performance Requirements: Minitary Service. Continuation Education System Development Project.

    ERIC Educational Resources Information Center

    La Puente Union High School District, CA.

    Funded under Title III of the Elementary and Secondary Education Act of 1965, the La Puente, California, continuation education project investigated (1) attitudes of former students concerning the success of the school in preparing them for entry into military service, (2) the minimal skills and knowledge required by each of the armed forces, (3)…

  6. Managing Tipping Point Dynamics in Single Development Projects

    DTIC Science & Technology

    2006-04-30

    Arditi & Kirsinikas, 1985). The failure of Watts Bar and Limerick are not isolated incidents of nuclear plant project failure. An investigation of...Institute of Technology. Arditi , D. & Kirsininkas, A. (1985). Nuclear power plant delays: Probable causes and resolutions. Transition in the Nuclear

  7. Rural Women Proprietorship Project. Research and Development Annual Report.

    ERIC Educational Resources Information Center

    Hazard Community Coll., KY.

    A project was created to provide individualized and technical training specially designed for women who desired to become small business owners. Recruitment of eastern Kentucky women in the Hazard Community College five-county service area was done through direct mailing; posting of flyers; and newspaper, radio, and television publicity. In…

  8. Development of educational CD-ROMs in astronomy: Information on a collaborative project

    NASA Astrophysics Data System (ADS)

    Frede, Valerie

    The observatory of Paris and the institute of teacher training (IUFM) in Toulouse have collaborated to develop multimedia support for astronomy lessons. The goal of this project is to provide additional didactical material such as CD-ROMs to elementary and high school teachers which will be used by children in the classroom. In this paper, we present the aims of the project and describe briefly the contents that have been developed so far. The project is a part of “Astrophysique sur Mesure”, a broader project led by the observatory of Paris which encourages the involvement of astronomers in the development of pedagogical tools.

  9. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    SciTech Connect

    Bonnal, P.; Féral, B.; Kershaw, K.; Nicquevert, B.; Baudin, M.; Lari, L.; Le Cardinal, J.

    2016-07-15

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies and development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.

  10. Development of Coated Conductors in Japanese National Project "Development of Fundamental Technologies for HTS Coils"

    NASA Astrophysics Data System (ADS)

    Yoshizumi, Masateru; Izumi, Teruo; Shiohara, Yuh

    RE1Ba2Cu3O7-x (REBCO, RE=rare earth) coated conductors have attracted the attention of many scientists due to the high superconducting properties, etc. Due to the great progress of R&D on coated conductors, the activities have shifted to specific applications. The new Japanese national project, named as "Development of Fundamental Technologies for HTS Coils", started last year aiming for the applications of MRI and medical accelerators. To meet the requirements of those applications, the R&D of REBCO coated conductors (CCs) are being performed with that of coiling technology in parallel. The theme has two sub-themes of "development of long CCs with high in-field performance" and "development of CCs with extremely low heat generation" in this national project. The ambitious goals of these themes are set as intermediate ones due 2016 Mar; the theme of in-field: 100m-500A/cm-w@65K, 3T -850A/cm-w@35K, 10T, the theme of low heat generation: 100m-500 μm of filament width w/ Icfilament inhomogeneity of distribution within 10% and joint resistance below 5nΩ. The final goals of these themes due 2018 Mar. were set as follows; the theme of in-field: 200m-600A/cm-w@65K, 3T -1000A/cm-w@35K, 10T, the theme of low heat generation: 200m-500 μm of filament width w/ Icfilament distribution within 5% and joint resistance below 3nΩ. The objectives, goals and progress of this project will be reviewed in this article. As for the progress, for example, the combination of EuBCO+BHO was found to be effective to improve the in-field performance of PLD derived coated conductors. A 94 m long wire with Icmin of 108A/cm-w@77K, 3T (corresponding to 472A/cm-w @65K, 3T) was successfully fabricated. It is as twice Icmin of the long tape as the highest one in the previous project.

  11. Field emitter array RF amplifier development project. Phase 1: Cathode technology development

    NASA Astrophysics Data System (ADS)

    Hui, Bertram

    1993-05-01

    Process in research and development continues at all sites. MCNC's program continues at full speed with smooth transition of project personnel. Electrical testing of field emitter arrays fabricated at MCNC continues at all sites. Effects of anode proximity on emission current capture are being investigated. Two new processes for gate opening alignment are under development. Both eliminate the necessity of retaining the nitride caps on the field emitter tips through the entire processing sequence. One requires alignment during an additional photolithography step, the other is self-aligning. Refinements in processing continue. Better control of the anisotropic silicon etch for tip formation has been achieved. In-house chem-mechanical polishing is still under investigation as a method for wafer planarization. Other materials are being evaluated for use as the insulating layer between substrate and gate. Better methods for depositing evaporated oxides are being sought, and the oxides as deposited are being characterized. Vacuum bonder and test system is operational. The bonding chamber has been outfitted for DC testing to improve test throughput, with electrical feedthroughs rated for 700 V at 10 A. Failure analysis of field emitter arrays from two lots was completed. Five mechanisms in two classes were identified as contributors to device failures: those mechanisms that destroyed working emitters, and those that prevented emitters from working. In anticipation of continued ARPA funding for the field emitter amplifier project, revised budgetary and scheduling information was prepared. Design of the process and reticle set for the next generation of devices has already begun.

  12. The OCCUPAC Project (A Project to Develop Occupational Information Learning Activity Packages for Grades K-9). Final Report.

    ERIC Educational Resources Information Center

    Peterson, Marla; And Others

    During Phase I of a two-phase project, 15 OCCUPACS (learning activity packages) were developed, pilot tested in a university laboratory school, field tested in four public school systems, revised, and submitted to professionals for final review. Intended to provide occupational information to children in Grades K-9 at different levels of…

  13. Project Athena: A Pathway to Advanced Literacy Development for Children of Poverty

    ERIC Educational Resources Information Center

    VanTassel-Baska, Joyce; Stambaugh, Tamra

    2006-01-01

    This article describes Project Athena, a Javits program funded by the U.S. Department of Education and developed through the Center for Gifted Education at the College of William and Mary. Project Athena seeks to find ways to help impoverished children develop advanced skills in reading comprehension, literary analysis, and persuasive writing. Its…

  14. Influence of 4-H Horse Project Involvement on Development of Life Skills

    ERIC Educational Resources Information Center

    Anderson, K. P.; Karr-Lilienthal, L.

    2011-01-01

    Four-H horse project members who competed in non-riding horse contests were surveyed to evaluate the influence of their horse project participation on life-skill development. Contests in which youth competed included Horse Bowl, Demonstrations, Public Speaking, and Art. Youth indicated a positive influence on both life-skill development and horse…

  15. 31 CFR 537.413 - Sale of interest in economic development projects in Burma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SANCTIONS REGULATIONS Interpretations § 537.413 Sale of interest in economic development projects in Burma... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Sale of interest in economic development projects in Burma. 537.413 Section 537.413 Money and Finance: Treasury Regulations Relating...

  16. Influence of 4-H Horse Project Involvement on Development of Life Skills

    ERIC Educational Resources Information Center

    Anderson, K. P.; Karr-Lilienthal, L.

    2011-01-01

    Four-H horse project members who competed in non-riding horse contests were surveyed to evaluate the influence of their horse project participation on life-skill development. Contests in which youth competed included Horse Bowl, Demonstrations, Public Speaking, and Art. Youth indicated a positive influence on both life-skill development and horse…

  17. Professional Competence Development at the Cooper Union School of Engineering. Project Report.

    ERIC Educational Resources Information Center

    Bussard, Ellen

    A 3-year project was developed to increase students' abilities to perform competently as professional engineers. The project sought to infuse into existing courses concern for, practice with, and development of three competencies critical to professional success: problem-solving, communication, and value clarification. Eight elementary and…

  18. Implications of Office of Education Bureau of Research Teacher Education Project for Developing Institutions. Final Report.

    ERIC Educational Resources Information Center

    Powell, E. C.

    The purposes of the Teacher Education Project Study at Jarvis Christian College were to investigate the relevance for small developing colleges of the new models for elementary education and to stimulate the adoption of the systems approach to institutional development in general. A 12-member Project Task Force composed of Jarvis faculty,…

  19. The role of the occupational hygienist in development-oriented public health engineering projects.

    PubMed

    Lacey, Steven

    2010-01-01

    Organizations dedicated to applying engineering solutions to improve health in developing countries may lack sufficient expertise in the public health aspects of these efforts to ensure successful project design and implementation. The occupational hygienist is a valuable complement to the efforts needed for development-oriented public health engineering projects.

  20. So What's Different? Student Achievement and Attitude Results from Instructional Development Projects.

    ERIC Educational Resources Information Center

    Eastmond, J. Nicholls; Van Horn, Kathleen L.

    Reported are the results of instructional development projects at Utah State University, funded under mini grants, faculty development grants, or developmental grants to departments. These projects involve redesign of courses in media production, library resources, pattern design and fitting, counselling psychology, quantitative methods,…