Sample records for development project phase

  1. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    NASA Technical Reports Server (NTRS)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  2. SH-2F LAMPS Instructional Systems Development: Phase II. Final Report.

    ERIC Educational Resources Information Center

    Gibbons, Andrew S.; Hymes, Jonah P.

    This project was one of four aircrew training development projects in a continuing study of the methodology, effectiveness, and resource requirements of the Instructional Systems Development (ISD) process. This report covers the Phase II activities of a two-phase project for the development of aircrew training for SH-2F anti-submarine warfare…

  3. Project: MOBILITY. Introduction and Summary.

    ERIC Educational Resources Information Center

    Fresno City Coll., CA.

    This report summarizes a project designed to develop vocational educational programs and services for educationally disadvantaged and physically handicapped students at Fresno City College, California. The introduction provides an overview of the two phases of the project: phase I, a needs assessment; and phase II, curriculum development and…

  4. User systems guidelines for software projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abrahamson, L.

    1986-04-01

    This manual presents guidelines for software standards which were developed so that software project-development teams and management involved in approving the software could have a generalized view of all phases in the software production procedure and the steps involved in completing each phase. Guidelines are presented for six phases of software development: project definition, building a user interface, designing software, writing code, testing code, and preparing software documentation. The discussions for each phase include examples illustrating the recommended guidelines. 45 refs. (DWL)

  5. Tracking and data systems support for the Helios project. Volume 1: Project development through end of mission, phase 2

    NASA Technical Reports Server (NTRS)

    Goodwin, P. S.; Traxler, M. R.; Meeks, W. G.; Flanagan, F. M.

    1976-01-01

    The overall evolution of the Helios Project is summarized from its conception through to the completion of the Helios-1 mission phase 2. Beginning with the project objectives and concluding with the Helios-1 spacecraft entering its first superior conjunction (end of mission phase 2), descriptions of the project, the mission and its phases, international management and interfaces, and Deep Space Network-spacecraft engineering development in telemetry, tracking, and command systems to ensure compatibility between the U.S. Deep Space Network and the German-built spacecraft are included.

  6. Streamline Your Project: A Lifecycle Model.

    ERIC Educational Resources Information Center

    Viren, John

    2000-01-01

    Discusses one approach to project organization providing a baseline lifecycle model for multimedia/CBT development. This variation of the standard four-phase model of Analysis, Design, Development, and Implementation includes a Pre-Analysis phase, called Definition, and a Post-Implementation phase, known as Maintenance. Each phase is described.…

  7. Implementation of a production Ada project: The GRODY study

    NASA Technical Reports Server (NTRS)

    Godfrey, Sara; Brophy, Carolyn Elizabeth

    1989-01-01

    The use of the Ada language and design methodologies that encourage full use of its capabilities have a strong impact on all phases of the software development project life cycle. At the National Aeronautics and Space Administration/Goddard Space Flight Center (NASA/GSFC), the Software Engineering Laboratory (SEL) conducted an experiment in parallel development of two flight dynamics systems in FORTRAN and Ada. The differences observed during the implementation, unit testing, and integration phases of the two projects are described and the lessons learned during the implementation phase of the Ada development are outlined. Included are recommendations for future Ada development projects.

  8. The path to an experiment in space (from concept to flight)

    NASA Technical Reports Server (NTRS)

    Salzman, Jack A.

    1994-01-01

    The following are discussed in this viewgraph presentation on developing flight experiments for NASA's Microgravity Science and Applications Program: time from flight PI selection to launch; key flight experiment phases and schedule drivers; microgravity experiment definition/development process; definition and engineering development phase; ground-based reduced gravity research facilities; project organization; responsibilities and duties of principle investigator/co-investigators, project scientist, and project manager; the science requirements document; flight development phase; experiment cost and schedule; and keys to experiment success.

  9. 13 CFR 305.9 - Project phasing and Investment disbursement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project phasing and Investment disbursement. 305.9 Section 305.9 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects...

  10. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    DOT National Transportation Integrated Search

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  11. DEVELOPMENT OF A SCALABLE, LOW-COST, ULTRANANOCRYSTALLINE DIAMOND ELECTROCHEMICAL PROCESS FOR THE DESTRUCTION OF CONTAMINANTS OF EMERGING CONCERN (CECS) - PHASE II

    EPA Science Inventory

    This Small Business Innovation Research (SBIR) Phase II project will employ the large scale; highly reliable boron-doped ultrananocrystalline diamond (BD-UNCD®) electrodes developed during Phase I project to build and test Electrochemical Anodic Oxidation process (EAOP)...

  12. Consortium for Planning, Developing, and Implementing Exploratory Industrial Career Development Models (Phase I of Three Phases). Interim Report.

    ERIC Educational Resources Information Center

    Oregon State Univ., Corvallis.

    The report describes the organizational phase of a project designed to create program models and supporting literature for exploratory industrial career development programs for grades seven to ten. The project was undertaken by Oregon State University in cooperation with the Oregon State Department of Education and involved the formation of a…

  13. Understanding cost growth during operations of planetary missions: An explanation of changes

    NASA Astrophysics Data System (ADS)

    McNeill, J. F.; Chapman, E. L.; Sklar, M. E.

    In the development of project cost estimates for interplanetary missions, considerable focus is generally given to the development of cost estimates for the development of ground, flight, and launch systems, i.e., Phases B, C, and D. Depending on the project team, efforts expended to develop cost estimates for operations (Phase E) may be relatively less rigorous than that devoted to estimates for ground and flight systems development. Furthermore, the project team may be challenged to develop a solid estimate of operations cost in the early stages of mission development, e.g., Concept Study Report or Systems Requirement Review (CSR/SRR), Preliminary Design Review (PDR), as mission specific peculiarities that impact cost may not be well understood. In addition, a methodology generally used to develop Phase E cost is engineering build-up, also known as “ grass roots” . Phase E can include cost and schedule risks that are not anticipated at the time of the major milestone reviews prior to launch. If not incorporated into the engineering build-up cost method for Phase E, this may translate into an estimation of the complexity of operations and overall cost estimates that are not mature and at worse, insufficient. As a result, projects may find themselves with thin reserves during cruise and on-orbit operations or project overruns prior to the end of mission. This paper examines a set of interplanetary missions in an effort to better understand the reasons for cost and staffing growth in Phase E. The method used in the study is discussed as well as the major findings summarized as the Phase E Explanation of Change (EoC). Research for the study entailed the review of project materials, including Estimates at Completion (EAC) for Phase E and staffing profiles, major project milestone reviews, e.g., CSR, PDR, Critical Design Review (CDR), the interviewing of select project and mission management, and review of Phase E replan materials. From this work, a detai- ed picture is constructed of why cost grew during the operations phase, even to the level of specific events in the life of the missions. As a next step, the Phase E EoC results were gleaned and synthesized to produce leading indicators, i.e., what may be identifiable signs of cost and staffing growth that may be present as early as PDR or CDR. Both a qualitative and quantitative approach was used to determine leading indicators. These leading indicators will be reviewed and a practical method for their use will be discussed.

  14. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order tomore » accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.« less

  15. Converging Redundant Sensor Network Information for Improved Building Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dale Tiller; D. Phil; Gregor Henze

    2007-09-30

    This project investigated the development and application of sensor networks to enhance building energy management and security. Commercial, industrial and residential buildings often incorporate systems used to determine occupancy, but current sensor technology and control algorithms limit the effectiveness of these systems. For example, most of these systems rely on single monitoring points to detect occupancy, when more than one monitoring point could improve system performance. Phase I of the project focused on instrumentation and data collection. During the initial project phase, a new occupancy detection system was developed, commissioned and installed in a sample of private offices and open-planmore » office workstations. Data acquisition systems were developed and deployed to collect data on space occupancy profiles. Phase II of the project demonstrated that a network of several sensors provides a more accurate measure of occupancy than is possible using systems based on single monitoring points. This phase also established that analysis algorithms could be applied to the sensor network data stream to improve the accuracy of system performance in energy management and security applications. In Phase III of the project, the sensor network from Phase I was complemented by a control strategy developed based on the results from the first two project phases: this controller was implemented in a small sample of work areas, and applied to lighting control. Two additional technologies were developed in the course of completing the project. A prototype web-based display that portrays the current status of each detector in a sensor network monitoring building occupancy was designed and implemented. A new capability that enables occupancy sensors in a sensor network to dynamically set the 'time delay' interval based on ongoing occupant behavior in the space was also designed and implemented.« less

  16. Visual detection of driving while intoxicated. Project interim report : identification of visual cues and development of detection methods

    DOT National Transportation Integrated Search

    1979-01-01

    The report describes the initial phase of a two-phase project on the visual, on-the-road detection of driving while intoxicated (DWI). The purpose of the overall project is to develop and test procedures for enhancing on-the-road detection of DWI. Th...

  17. Developing Online Problem-Based Resources for the Professional Development of Teachers of Children with Visual Impairment

    ERIC Educational Resources Information Center

    McLinden, Mike; McCall, Steve; Hinton, Danielle; Weston, Annette; Douglas, Graeme

    2006-01-01

    This article presents a summary of the results from phase 1 of a two-phase research project. Drawing on the principles of problem-based learning (PBL), the aims of phase 1 were to design, develop and evaluate a set of flexible online teaching resources for use within a virtual learning environment. Participants in the project (n = 10) were…

  18. The SIMRAND methodology - Simulation of Research and Development Projects

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  19. Avionics Technology Contract Project Report Phase I with Research Findings.

    ERIC Educational Resources Information Center

    Sappe', Hoyt; Squires, Shiela S.

    This document reports on Phase I of a project that examined the occupation of avionics technician, established appropriate committees, and conducted task verification. Results of this phase provide the basic information required to develop the program standards and to guide and set up the committee structure to guide the project. Section 1…

  20. Evaluation of Free To Grow, Phase II: Detailed Profile of the Free To Grow Project in California. Final Report.

    ERIC Educational Resources Information Center

    Harrington, Mary

    The Free to Grow pilot project, developed by the Charles R. Drew University of Medicine and Science and its Head Start project, operated between 1994 and 1999. Following a 2-year planning and development stage, 5 project sites went on to complete the 3-year implementation phase in California, Colorado, Kentucky, New York, and Puerto Rico; the…

  1. The Project P.A.T.H.S. in Hong Kong: Work Done and Lessons Learned in a Decade.

    PubMed

    Shek, Daniel T L; Wu, Florence K Y

    2016-02-01

    The Project Positive Adolescent Training through Holistic Social Programs is a positive youth development program initiated and financially supported by The Hong Kong Jockey Club Charities Trust. Since 2005, the project has gone through several phases, including the initial phase (2005-2012), school-based extension phase (2009-2016), and community-based extension phase (2013-2017). In the initial phase, with the involvement of academics from 5 universities in Hong Kong, the research team developed youth enhancement programs for junior secondary school students (20 hours per grade), trained the program implementers (20 hours per grade), assisted in the implementation in more than 250 schools, and evaluated the program using multiple evaluation strategies, including a 5-year longitudinal experimental study. In the school-based extension phase, the project was implemented for another cycle (2009-2010 and 2011-2012 school years) and a 6-year longitudinal study was conducted to understand the psychosocial development of Chinese adolescents in Hong Kong. In the community-based extension phase, the programs were administered by social workers in the community settings. Generally speaking, different evaluation findings showed that the programs in Project Positive Adolescent Training through Holistic Social Programs promoted positive development and reduced risk behavior in Chinese adolescents in Hong Kong. Positive youth development attributes and family functioning also have positive contributions to adolescent developmental outcomes over time. Copyright © 2016 North American Society for Pediatric and Adolescent Gynecology. Published by Elsevier Inc. All rights reserved.

  2. Designing for Change: Minimizing the Impact of Changing Requirements in the Later Stages of a Spaceflight Software Project

    NASA Technical Reports Server (NTRS)

    Allen, B. Danette

    1998-01-01

    In the traditional 'waterfall' model of the software project life cycle, the Requirements Phase ends and flows into the Design Phase, which ends and flows into the Development Phase. Unfortunately, the process rarely, if ever, works so smoothly in practice. Instead, software developers often receive new requirements, or modifications to the original requirements, well after the earlier project phases have been completed. In particular, projects with shorter than ideal schedules are highly susceptible to frequent requirements changes, as the software requirements analysis phase is often forced to begin before the overall system requirements and top-level design are complete. This results in later modifications to the software requirements, even though the software design and development phases may be complete. Requirements changes received in the later stages of a software project inevitably lead to modification of existing developed software. Presented here is a series of software design techniques that can greatly reduce the impact of last-minute requirements changes. These techniques were successfully used to add built-in flexibility to two complex software systems in which the requirements were expected to (and did) change frequently. These large, real-time systems were developed at NASA Langley Research Center (LaRC) to test and control the Lidar In-Space Technology Experiment (LITE) instrument which flew aboard the space shuttle Discovery as the primary payload on the STS-64 mission.

  3. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  4. EARLY ENTRANCE COPRODUCTION PLANT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Storm; Govanon Nongbri; Steve Decanio

    2004-01-12

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc., GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I, a design basis for the Fischer-Tropsch Synthesis section was developed based on limited experience with the specified feed gas and operating conditions. The objective of this Task in Phase II RD&T work was to confirm the performance of the F-T reactor at the set design conditions. Although much of the research, development, and testing work were done by TES outside of this project, several important issues were addressed in this phase of the project. They included Rejuvenation/Regeneration of the Fischer-Tropsch Catalyst, online Catalyst Withdrawal and Addition from the synthesis reactor, and the Fischer-Tropsch Design Basis Confirmation. In Phase III the results from these RD&T work will be incorporated in developing the engineering design package. This Topical Report documents the Phase II RD&T work that was completed for this task.« less

  5. Initial Results of the Master's Degree Programme in "Leadership in Medicine" – Impact on hospital-based follow-on training of doctors

    PubMed Central

    Wulfert, Chris-Henrik; Hoitz, Joachim; Senger, Ulrike

    2017-01-01

    Objective: This pilot project, which was jointly conducted by a hospital and a university, describes the development of the Master's Degree Programme in Leadership in Medicine, a course designed to supplement medical specialty training. The aim of the pilot project is to demonstrate how hospital-based projects on personnel and organisational development undertaken under academic supervision can be used to increase leadership responsibility among doctors whose duties include providing initial and follow-on training and to professionalise medical specialty training as a leadership task. This need arose from the nationwide requirements and an internal audit regarding follow-on training. The version of the degree programme described below aims to further the personnel development of the participants in the field of didactics. Method: Each of the nine modules is made up of two classroom-based phases and one distance learning phase. The distance learning phase involves undertaking hospital-based projects on personnel and organisational development under academic supervision. The pilot phase participants were hospital doctors who, as part of their duties, hold leadership responsibility or are involved in the follow-on training of doctors. Results: The 17 participants successfully implemented more than 30 hospital-based projects during the distance learning phases of the nine modules. These projects included the development of medical specialty curricula, relevant didactic methods and evaluation design and were subsequently presented and subjected to reflection in interdisciplinary groups. The project presentation together with the project report were regarded as proof of competency. Conclusion: In addition to enhancing participant competency, the degree model described, which interlinks theory and practice, promotes organisational development through the implementation of projects undertaken under academic supervision. This has a double impact on the quality of medical follow-on training at the hospital where the participant is based, for not only is the individual's didactic competency enhanced, but so is the "learning organisation" as a whole as a result of continuous project orientation. PMID:29226220

  6. Initial Results of the Master's Degree Programme in "Leadership in Medicine" - Impact on hospital-based follow-on training of doctors.

    PubMed

    Wulfert, Chris-Henrik; Hoitz, Joachim; Senger, Ulrike

    2017-01-01

    Objective: This pilot project, which was jointly conducted by a hospital and a university, describes the development of the Master's Degree Programme in Leadership in Medicine, a course designed to supplement medical specialty training. The aim of the pilot project is to demonstrate how hospital-based projects on personnel and organisational development undertaken under academic supervision can be used to increase leadership responsibility among doctors whose duties include providing initial and follow-on training and to professionalise medical specialty training as a leadership task. This need arose from the nationwide requirements and an internal audit regarding follow-on training. The version of the degree programme described below aims to further the personnel development of the participants in the field of didactics. Method: Each of the nine modules is made up of two classroom-based phases and one distance learning phase. The distance learning phase involves undertaking hospital-based projects on personnel and organisational development under academic supervision. The pilot phase participants were hospital doctors who, as part of their duties, hold leadership responsibility or are involved in the follow-on training of doctors. Results: The 17 participants successfully implemented more than 30 hospital-based projects during the distance learning phases of the nine modules. These projects included the development of medical specialty curricula, relevant didactic methods and evaluation design and were subsequently presented and subjected to reflection in interdisciplinary groups. The project presentation together with the project report were regarded as proof of competency. Conclusion: In addition to enhancing participant competency, the degree model described, which interlinks theory and practice, promotes organisational development through the implementation of projects undertaken under academic supervision. This has a double impact on the quality of medical follow-on training at the hospital where the participant is based, for not only is the individual's didactic competency enhanced, but so is the "learning organisation" as a whole as a result of continuous project orientation.

  7. The National Council on Crime and Delinquency NewGate Resource Center. Final Report.

    ERIC Educational Resources Information Center

    Herron, Rex; Muir, John

    The origin and development of Project NewGate are described from 1971-74. (The project presents a model program of higher education for incarcerated offenders, consisting of the in-prison phase, transitional phase, and release phase.) Specific project characteristics are discussed and include a 4-year academic program for prison inmates; an…

  8. Lafayette Parish Cooperative Jail Project--LPCJP. Phase III Final Report.

    ERIC Educational Resources Information Center

    Lafayette Parish School Board, LA.

    A three-phase project was conducted to further the education of inmates in the Lafayette (Louisiana) Parish Correctional Center. Phase I of the project was designed to prepare inmates to be eligible to take the General Educational Development (GED) test, and/or to teach life-coping skills so that they would better function in society upon their…

  9. Biomass power for rural development: Phase 2. Technical progress report, April 1--June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    1998-11-01

    The project undertaken by the Salix Consortium is a multi-phased, multi-partner endeavor. Phase-1 focused on initial development and testing of the technology and agreements necessary to demonstrate commercial willow production in Phase-2. The Phase-1 objectives have been successfully completed: preparing final design plans for two utility pulverized coal boilers, developing fuel supply plans for the project, obtaining power production commitments from the power companies for Phase-2, obtaining construction and environmental permits, and developing an experimental strategy for crop production and power generation improvements needed to assure commercial success. The R and D effort also addresses environmental issues pertaining to introductionmore » of the willow energy system. Beyond those Phase-1 requirements the Consortium has already successfully demonstrated cofiring at Greenidge Station and developed the required nursery capacity for acreage scale-up. This past summer 105 acres were prepared in advance for the spring planting in 1998. Having completed the above tasks, the Consortium is well positioned to begin Phase-2. In phase-2 every aspect of willow production and power generation from willow will be demonstrated. The ultimate objective of Phase-2 is to transition the work performed under the Rural Energy for the Future project into a thriving, self-supported energy crop enterprise.« less

  10. Structures and Design Phase I Summary for the NASA Composite Cryotank Technology Demonstration Project

    NASA Technical Reports Server (NTRS)

    Johnson, Ted; Sleight, David W.; Martin, Robert A.

    2013-01-01

    A description of the Phase I structures and design work of the Composite Cryotank Technology Demonstration (CCTD) Project is in this paper. The goal of the CCTD Project in the Game Changing Development (GCD) Program is to design and build a composite liquid-hydrogen cryogenic tank that can save 30% in weight and 25% in cost compared to state-of-the-art aluminum metallic cryogenic tank technology when the wetted composite skin wall is at an allowable strain of 5000 in/in. Three Industry teams developed composite cryogenic tank concepts that are compared for weight to an aluminum-lithium (Al-Li) cryogenic tank designed by NASA in Phase I of the CCTD Project. The requirements used to design all of the cryogenic tanks in Phase I will be discussed and the resulting designs, analyses, and weight of the concepts developed by NASA and Industry will be reviewed and compared.

  11. Electronic construction collaboration system -- final phase.

    DOT National Transportation Integrated Search

    2014-09-01

    This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as : Attolist) on the Iowa Falls Arch Bridge project and (2) develop a WPMS for projects under $10 million. : For the first maj...

  12. UAS Integration in the NAS: Detect and Avoid

    NASA Technical Reports Server (NTRS)

    Shively, Jay

    2018-01-01

    This presentation will cover the structure of the unmanned aircraft systems (UAS) integration into the national airspace system (NAS) project (UAS-NAS Project). The talk also details the motivation of the project to help develop standards for a detect-and-avoid (DAA) system, which is required in order to comply with requirements in manned aviation to see-and-avoid other traffic so as to maintain well clear. The presentation covers accomplishments reached by the project in Phase 1 of the research, and touches on the work to be done in Phase 2. The discussion ends with examples of the display work developed as a result of the Phase 1 research.

  13. How the bioanalytical scientist plays a key role in interdisciplinary project teams in the development of biotherapeutics - a reflection of the European Bioanalysis Forum.

    PubMed

    Dudal, Sherri; Staack, Roland F; Stoellner, Daniela; Fjording, Marianne Scheel; Vieser, Eva; Pascual, Marie-Hélène; Brudny-Kloeppel, Margarete; Golob, Michaela

    2014-05-01

    The bioanalytical scientist plays a key role in the project team for the drug development of biotherapeutics from the discovery to the marketing phase. Information from the project team members is required for assay development and sample analysis during the discovery, preclinical and clinical phases of the project and input is needed from the bioanalytical scientist to help data interpretation. The European Bioanalysis Forum target team 20 discussed many of the gaps in information and communication between the bioanalytical scientist and project team members as a base for providing a perspective on the bioanalytical scientist's role and interactions within the project team.

  14. USL/DBMS NASA/PC R and D project system testing standards

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  15. Development of a highway incident management operational and training guide : phase II.

    DOT National Transportation Integrated Search

    2014-08-01

    The overall goal of both phases of this project was to reduce responder fatalities and injuries, as well as to prevent : secondary crashes, especially those involving incident responders. The phases of this project worked toward this goal : by creati...

  16. NASA's UAS NAS Access Project

    NASA Technical Reports Server (NTRS)

    Johnson, Charles W.

    2011-01-01

    The vision of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) Project is "A global transportation system which allows routine access for all classes of UAS." The goal of the UAS Integration in the NAS Project is to "contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS." This goal will be accomplished through a two-phased approach based on development of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Phase 1 will take place the first two years of the Project and Phase 2 will take place the following three years. The Phase 1 and 2 technical objectives are: Phase 1: Developing a gap analysis between current state of the art and the Next Generation Air Transportation System (NextGen) UAS Concept of Operations . Validating the key technical areas identified by this Project . Conducting initial modeling, simulation, and flight testing activities . Completing Sub-project Phase 1 deliverables (spectrum requirements, comparative analysis of certification methodologies, etc.) and continue Phase 2 preparation (infrastructure, tools, etc.) Phase 2: Providing regulators with a methodology for developing airworthiness requirements for UAS, and data to support development of certifications standards and regulatory guidance . Providing systems-level, integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and human systems integration in operationally relevant environments. The UAS in the NAS Project will demonstrate solutions in specific technology areas, which will address operational/safety issues related to UAS access to the NAS. Since the resource allocation for this Project is limited ($150M over the five years), the focus is on reducing the technical barriers where NASA has unique capabilities. As a result, technical areas, such as Sense and Avoid (SAA) and beyond line of sight command and control will not be addressed. While these are critical barriers to UAS access, currently, there is a great deal of global effort being exercised to address these challenge areas. Instead, specific technology development in areas where there is certainty that NASA can advance the research to high technology readiness levels will be the Project's focus. Specific sub-projects include Separation Assurance, Human Systems Integration, Communications, Certification, and Integrated Test and Evaluation. Each sub-project will transfer technologies to relevant key stakeholders and decision makers through research transition teams, technology forums, or through other analogous means.

  17. Error Cost Escalation Through the Project Life Cycle

    NASA Technical Reports Server (NTRS)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  18. Manned Spacecraft Requirements for Materials and Processes

    NASA Technical Reports Server (NTRS)

    Vaughn, Timothy P.

    2006-01-01

    A major cause of project failure can be attributed to an emphasized focus on end products and inadequate attention to resolving development risks during the initial phases of a project. The initial phases of a project, which we will call the "study period", are critical to determining project scope and costs, and can make or break most projects. If the requirements are not defined adequately, how can the scope be adequately determined, also how can the costs of the entire project be effectively estimated, and how can the risk of project success be accurately assessed? Using the proper material specifications and standards and incorporating these specifications and standards in the design process should be considered inherently crucial to the technical success of a project as just as importantly, crucial to the cost and schedule success. This paper will intertwine several important aspects or considerations for project success: 1) Characteristics of a "Good Material Requirement"; 2) Linking material requirements to the implementation of "Design for Manufacturing"; techniques and 3) The importance of decomposing materials requirements during the study phase/development phase to mitigate project risk for the maturation of technologies before the building of hardware.

  19. Current status of the joint Mayo Clinic-IBM PACS project

    NASA Astrophysics Data System (ADS)

    Hangiandreou, Nicholas J.; Williamson, Byrn, Jr.; Gehring, Dale G.; Persons, Kenneth R.; Reardon, Frank J.; Salutz, James R.; Felmlee, Joel P.; Loewen, M. D.; Forbes, Glenn S.

    1994-05-01

    A multi-phase collaboration between Mayo Clinic and IBM-Rochester was undertaken, with the goal of developing a picture archiving and communication system for routine clinical use in the Radiology Department. The initial phase of this project (phase 0) was started in 1988. The current system has been fully integrated into the clinical practice and, to date, over 6.5 million images from 16 imaging modalities have been archived. Phase 3 of this project has recently concluded.

  20. The Outer Planetary Mission Design Project

    NASA Astrophysics Data System (ADS)

    Benfield, Michael; Turner, M. W.

    2010-10-01

    With the recent focus from the planetary science community on the outer planets of the solar system, The University of Alabama in Huntsville Integrated Product Team program is embarking on a new challenge to develop an outer planetary mission for the academic year 2010-2011. Currently four bodies are of interest for this mission: Titan, Europa, Triton, and Enceledus, with one body being chosen by the instructors by the beginning of the fall semester. This project will use the 2010 Discovery Announcement of Opportunity as its Request for Proposal (RFP). All of the teams competing in this project will use the AO to respond with a proposal to the instructors for their proposed mission and spacecraft concept. The project employs the two-semester design sequence of the IPT program to provide a framework for the development of this mission. This sequence is divided into four phases. Phase 1 - Requirements Development - focuses on the development of both the scientific and engineering requirements of the mission. During this phase the teams work very closely with the PI organization, represented by the College of Charleston. Phase 2 - Team Formation and Architecture Development - concentrates on the assessment of the overall mission architecture from the launch vehicle to the ground operations of the proposed spacecraft. Phase 3 - System Definition - provides for spacecraft subsystem trade studies and further refinement of the specific spacecraft to meet the scientific requirements and objectives developed in Phase 1. Phase 4 - Design - is the phase where the engineers provide the spacecraft design that is required for the mission of interest. At the conclusion of Phases 2 and 4, an external review board evaluates the proposed designs and chooses one winner of the competition.

  1. NASA's Plans for Developing Life Support and Environmental Monitoring and Control Systems

    NASA Technical Reports Server (NTRS)

    Lawson, B. Michael; Jan, Darrell

    2006-01-01

    Life Support and Monitoring have recently been reworked in response to the Vision for Space Exploration. The Exploration Life Support (ELS) Project has replaced the former Advanced Life Support Element of the Human Systems Research and Technology Office. Major differences between the two efforts include: the separation of thermal systems into a new stand alone thermal project, deferral of all work in the plant biological systems, relocation of food systems to another organization, an addition of a new project called habitation systems, and overall reduction in the number of technology options due to lower funding. The Advanced Environmental Monitoring and Control (AEMC) Element is retaining its name but changing its focus. The work planned in the ELS and AEMC projects is organized around the three major phases of the Exploration Program. The first phase is the Crew Exploration Vehicle (CEV). The ELS and AEMC projects will develop hardware for this short duration orbital and trans-lunar vehicle. The second phase is sortie landings on the moon. Life support hardware for lunar surface access vehicles including upgrades of the CEV equipment and technologies which could not be pursued in the first phase due to limited time and budget will be developed. Monitoring needs will address lunar dust issues, not applicable to orbital needs. The ELS and AEMC equipment is of short duration, but has different environmental considerations. The third phase will be a longer duration lunar outpost. This will consist of a new set of hardware developments better suited for long duration life support and associated monitoring needs on the lunar surface. The presentation will show the planned activities and technologies that are expected to be developed by the ELS and AEMC projects for these program phases.

  2. U10 : Trusted Truck(R) II (phase B).

    DOT National Transportation Integrated Search

    2009-01-01

    Phase B of the Trusted Truck II project built on the system developed in Phase A (or Year 1). For the implementation portion of the project, systems were added to the trailer to provide additional diagnostic trailer data that can be sent to the TTM...

  3. Florida Schoolhouse Systems Project. First Phase Report.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee.

    A description is presented of the first phase of the Florida Schoolhouse Systems Project. Following a presentation of the background and objectives of the SSP, the development of integrated building systems is considered with regard to--(1) stimulation of research and development, (2) performance specifications and competitive bidding, and (3)…

  4. Planning level assessment of greenhouse gas emissions for alternative transportation construction projects : carbon footprint estimator, phase II, volume I - GASCAP model.

    DOT National Transportation Integrated Search

    2014-03-01

    The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...

  5. Report of the Computer Assisted Instruction Project in the Faculty of Nursing at the University of Calgary.

    ERIC Educational Resources Information Center

    Hannah, Kathryn

    Since August of 1976, the Faculty of Nursing at the University of Calgary has developed and implemented a four-phase computer assisted instruction (CAI) project. In Phase I, the pilot project to demonstrate effectiveness of CAI as an alternative teaching strategy in that setting has been completed and replication is on-going. In Phase II,…

  6. Iowa High School Industrial Arts Curriculum Project. Report on Year One of Phase II.

    ERIC Educational Resources Information Center

    Des Moines Public Schools, IA.

    Phase II of the Iowa High School Industrial Arts project sought to revise industrial arts content to include the infusion of new technologies, structured mathematics and science content, and a less project-oriented approach to teaching. The project identified a philosophical basis and a content structure; set priorities for development and…

  7. Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1976-11-01

    The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hotmore » brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.« less

  8. Preparing project managers for faster-better-cheaper robotic planetary missions

    NASA Technical Reports Server (NTRS)

    Gowler, P.; Atkins, K.

    2003-01-01

    The authors have developed and implemented a week-long workshop for Jet Propulsion Laboratory Project Managers, designed around the development phases of the JPL Project Life Cycle. The workshop emphasizes the specific activities and deliverables that pertain to JPL managers of NASA robotic space exploration and instrument development projects.

  9. Commercial Art. Project Report Phase I with Research Findings.

    ERIC Educational Resources Information Center

    Brown, Ted; Sappe', Hoyt

    This report provides results of Phase I of a project that researched the occupational area of commercial art, established appropriate committees, and conducted task verification. These results are intended to guide development of a program designed to train commercial artists. Section 1 contains general information: purpose of Phase I; description…

  10. REDUCTION OF USE OF PETROLEUM ENERGY RESOURCES BY CONVERSION OF WASTE COOKING OILS INTO DIESEL FUEL

    EPA Science Inventory

    This project has a dual objective of providing hands-on experience to undergraduate engineering students and producing biodiesel fuel from a used cooking oil feedstock. The project consists of three phases: Phase I - process development and construction of a pilot plant; Phase...

  11. Resource Development Opportunities for the Association of Leadership Educators: Phase One

    ERIC Educational Resources Information Center

    Noble, Donnette J.; Matesi, Lyna; Breen, Jennifer Moss; Horstmeier, Robin Peiter; Anderson, Dennis M.; Allen, Stuart; Pedigo, Leslie

    2016-01-01

    This application brief shares Phase One of an action research project for the Association of Leadership Educators. This project demonstrates how a member-based association can successfully engage its members in terms of identifying needs, defining strategic priorities, and detecting resource development opportunities. This body of work has various…

  12. Development of Young Adults Eating and Active for Health (YEAH) internet-based intervention via a community-based participatory research model.

    PubMed

    Kattelmann, Kendra K; White, Adrienne A; Greene, Geoffrey W; Byrd-Bredbenner, Carol; Hoerr, Sharon L; Horacek, Tanya M; Kidd, Tandalayo; Colby, Sarah; Phillips, Beatrice W; Koenings, Mallory M; Brown, Onikia N; Olfert, Melissa; Shelnutt, Karla P; Morrell, Jesse Stabile

    2014-01-01

    To develop a tailored, theory-based, Web-delivered intervention to prevent excessive weight gain in young adults using a Community-Based Participatory Research model. Investigators from 14 universities developed the intervention and supporting administrative portal using the 4 phases of the PRECEDE model. Steering committees were composed of the target audience (aged 19-24 years) and key health/wellness personnel were formed at each institution and provided information during each phase that was used to guide development of the intervention, Project YEAH (Young Adults Eating and Active for Health). Piloting results were used to refine the curriculum and identify and avoid barriers to delivery. Qualitative and quantitative data collected at each phase informed Project YEAH development. In Phase 1, factors of highest priority to young adults were identified. In Phase 2, environmental supports for healthful lifestyles were elucidated. In Phase 3, behavior and environmental changes considered important and changeable were identified. In Phase 4, the 10-week, theory-based, stage-tailored, interactive-learning intervention with a 10-month reinforcement period was developed. Applying the PRECEDE model with fidelity during development of Project YEAH resulted in an intervention that pilot participants found relevant and useful, gained attention, instilled confidence in the ability to apply the information, and provided a sense of satisfaction. Copyright © 2014. Published by Elsevier Inc.

  13. Individualized In-Service Teacher Education. (Project IN-STEP). Evaluation Report, Phase II.

    ERIC Educational Resources Information Center

    Thurber, John C.

    Phase 2 of Project IN-STEP was conducted to revise, refine, and conduct further field testing of a new inservice teacher education model. The method developed (in Phase 1--see ED 003 905 for report) is an individualized, multi-media approach. Revision activities, based on feedback provided for Phase 1, include the remaking of six videotape…

  14. Development and demonstration of marketing techniques for establishment of ridesharing corporations in New York State: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, E.W.; Matthews, N.P.

    1987-10-01

    The intent of this project was to develop, demonstrate and evaluate marketing techniques for the establishment of ridesharing corporations in New York State. The objectives of the first phase of the project were to: (1) develop a ''how-to'' guide for establishing a ridesharing corporation; and (2) conduct a market assessment to identify specific methods for capturing potential users of the service. The objectives of the second phase of the project were to: (1) prepare and implement a marketing strategy to address the various major users and evaluate the viability of new marketing techniques developed in Phase 1 and marketing techniquesmore » developed during the first year of operations; and (2) develop and disseminate a ''how-to'' guide regarding the development, implementation and evaluation of marketing strategies for ridesharing in New York State.« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flanigan, Tom; Pybus, Craig; Roy, Sonya

    This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less

  16. A PDS Partnership Goes International: Phase I of an American-Slovenian Collaborative Research Project

    ERIC Educational Resources Information Center

    Catelli, Linda; Carlino, Joan; Jackson, Valerie; Petraglia, GinaMarie

    2011-01-01

    The focus of the article is on Phase I of an American-Slovenian collaborative research project that was aimed at investigating effective classroom teaching-learning performances. The international project involved Dowling College and its first Professional Development School (PDS)--the Belmont Elementary PDS--and the University of Primorska at…

  17. Development of an Industrial Engineering Project

    ERIC Educational Resources Information Center

    Moreno, Lorenzo; Gonzalez, Evelio; Acosta, Leopoldo; Toledo, Jonay; Marichal, Nicolas; Hamilton, Alberto; Sigut, Marta; Mendez, J. Albino; Hernandez, Sergio; Torres, Santiago

    2005-01-01

    This paper presents a teaching strategy of the scheduling and developmental phase of an Industrial Engineering computer project. It is based on a real project which has been carried out by our department in collaboration with a local company. The classroom setting provides an environment where students can experience firsthand all phases of the…

  18. Two-Phased Approach to Synchronize the FERC-USACE Processes for Authorizing Non-Federal Hydropower Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-07-01

    Publication summarizing how the United States Army Corps of Engineers (USACE) and Federal Regulatory Energy Commission (FERC) have developed a two-phased, coordinated approach to regulating non-federal hydropower projects.

  19. Sheet Metal Contract. Project Report Phase I with Research Findings.

    ERIC Educational Resources Information Center

    Kirkpatrick, Thomas; Sappe', Hoyt

    This report provides results of Phase I of a project that researched the occupational area of sheet metal, established appropriate committees, and conducted task verification. These results are intended to guide development of a program designed to train sheet metal workers. Section 1 contains general information: purpose of Phase I; description…

  20. North Dakota Statewide Nursing Study, Phase III. Final Report and Recommendations.

    ERIC Educational Resources Information Center

    Clark, Neil; Smith, David

    The process, outcomes, and recommendations resulting from a project to develop a statewide nursing resource planning system are examined. Phase 1 of the project investigated nursing manpower demands for 1984 and 1986, while phase 2 studied the current scope of nursing practice. In addition to summarizing the findings of these investigations,…

  1. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology andmore » the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karpenko, V.; Salmon, J.

    The goal of this project was to work together through the project phases to conceive, demonstrate, and produce concepts for detecting, locating, tracking, imaging, and assessing emissions passively or actively. The initial Sensor Concept Exploration Phase was postulated and assessed concepts at a first-order level to ascertain whether the parties’ concepts (either separately developed or jointly developed) had merit for missile defense and homeland security applications

  3. VOCATIONAL-TECHNICAL FACILITIES PROJECT. PROGRESS REPORT.

    ERIC Educational Resources Information Center

    CONRAD, M.J.; VALENTINE, I.E.

    IN THE FIRST PHASE OF A PROJECT FOR DEVELOPING PLANNING GUIDES FOR VOCATIONAL FACILITIES, THE OVERALL DIRECTION OF A SERIES OF PLANNING GUIDES IS BEING DETERMINED. IN THE SECOND PHASE AT LEAST ONE PLANNING MANUAL WILL BE DEVELOPED TO SERVE AS A MODEL FOR THE FULL SERIES. A LOCAL WORKING GROUP COMPOSED OF THREE SPECIALISTS FROM THE CENTER FOR…

  4. Individualized Inservice Teacher Education (Project In-Step). Evaluation Report. Phase III.

    ERIC Educational Resources Information Center

    Thurber, John C.

    This is a report on the third phase of Project IN-STEP, which was intended to develop a viable model for individualized, multi-media in-service teacher education programs. (Phase I and II are reported in ED 033 905, and ED 042 709). The rationale for Phase III was to see if the model could be successfully transferred to an area other than teaching…

  5. Summary of development of 70 MW class model superconducting generator--research and development of superconducting for electric power application

    NASA Astrophysics Data System (ADS)

    Oishi, Ikuo; Nishijima, Kenichi

    2002-03-01

    A 70 MW class superconducting model generator was designed, manufactured, and tested from 1988 to 1999 as Phase I, which was Japan's national project on applications of superconducting technologies to electric power apparatuses that was commissioned by NEDO as part of New Sunshine Program of AIST and MITI. Phase II then is now being carried out by almost same organization as Phase I. With the development of the 70 MW class superconducting model generator, technologies for a 200 MW class pilot generator were established. The world's largest output (79 MW), world's longest continuous operation (1500 h), and other sufficient characteristics were achieved on the 70 MW class superconducting model generator, and key technologies of design and manufacture required for the 200 MW class pilot generator were established. This project contributed to progress of R&D of power apparatuses. Super-GM has started the next project (Phase II), which shall develop the key technologies for larger-capacity and more-compact machine and is scheduled from 2000 to 2003. Phase II shall be the first step for commercialization of superconducting generator.

  6. Laser sensor system documentation.

    DOT National Transportation Integrated Search

    2017-03-01

    Phase 1 of TxDOT Project 0-6873, True Road Surface Deflection Measuring Device, developed a : laser sensor system based on several sensors mounted on a rigid beam. : This sensor system remains with CTR currently, as the project is moving into Phase 2...

  7. DARPA Advanced High Current Density Cathodes for Defense Applications: Development Phase

    DTIC Science & Technology

    1993-03-01

    Project Number 01-0624-07-0857 Report Number SAIC-93/1018 March 1, 1993 Science Apphcations Internatia Corporation An Employee-Owned Company OTIC a...Density Cathodes for Defense Applications: Development Phase FINAL REPORT Contract Number N00014-90-C-2118 Project Number 01-0624-07-0857 Report...of a typical Si-TaSi2 boule used for the eutectic advanced cathode materials in this project . The seed for the boule is at right in the photograph. v

  8. Technology Development Report: CDDF, Dual Use Partnerships, SBIR/STTR: Fiscal Year 2003 Activities

    NASA Technical Reports Server (NTRS)

    Bailey, John W.

    2004-01-01

    The FY2003 NASA John C. Stennis Stennis Space Center (SSC) Technology Development Report provides an integrated report of all technology development activities at SSC. This report actually combines three annual reports: the Center Director's Discretionary Fund (CDDF) Program Report, Dual Use Program Report, and the Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) Program Report. These reports are integrated in one document to summarize all technology development activities underway in support of the NASA missions assigned to SSC. The Dual Use Program Report provides a summary review of the results and status of the nine (9) Dual Use technology development partnership projects funded and managed at SSC during FY2003. The objective of these partnership projects is to develop or enhance technologies that will meet the technology needs of the two NASA SSC Mission Areas: Propulsion Test and Earth Science Applications. During FY2003, the TDTO managed twenty (20) SBIR Phase II Projects and two (2) STTR Phase II Projects. The SBIR contracts support low TRL technology development that supports both the Propulsion Test and the Earth Science Application missions. These projects are shown in the SBIR/STTR Report. In addition to the Phase II contracts, the TDTO managed ten (10) SBIR Phase I contracts which are fixed price, six month feasibility study contracts. These are not listed in this report. Together, the Dual Use Projects and the SBIR/STTR Projects constitute a technology development partnership approach that has demonstrated that success can be achieved through the identification of the technical needs of the NASA mission and using various available partnership techniques to maximize resource utilization to achieve mutual technology goals. Greater use of these partnership techniques and the resource leveraging they provide, is a goal of the TDTO, providing more support to meet the technology development needs of the mission areas at SSC.

  9. Analysis of the Emission Inventories and Model-Ready Emission Datasets of Europe and North America for Phase 2 of the AQMEII Project

    EPA Science Inventory

    This paper highlights the development of the emission inventories and emission processing for Europe (EU) and North America (NA) in the second phase of the Air Quality Model Evaluation International Initiative (AQMEII) project. The main purpose of the second phase of the AQMEII...

  10. We Have a Better Idea. (An Experimental Project in Lesson Development) Phase I [and] The World to the Classroom.

    ERIC Educational Resources Information Center

    Dynneson, Thomas L., Ed.; And Others

    Social studies lessons developed by students in the elementary social studies education program at the University of Texas (Permian Basin) are provided. The lessons are presented according to the phase in which they were developed. Phase I consists of lessons created in the Fall, 1979; Phase II includes selected Phase I lessons which were revised,…

  11. Space market model development project, phase 3

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Hamel, Gary P.

    1989-01-01

    The results of a research project investigating information needs for space commercialization is described. The Space Market Model Development Project (SMMDP) was designed to help NASA identify the information needs of the business community and to explore means to meet those needs. The activity of the SMMDP is reviewed and a report of its operation via three sections is presented. The first part contains a brief historical review of the project since inception. The next part reports results of Phase 3, the most recent stage of activity. Finally, overall conclusions and observations based on the SMMDP research results are presented.

  12. ISTC projects devoted to improving laser beam quality

    NASA Astrophysics Data System (ADS)

    Malakhov, Yu. I.

    2007-05-01

    Short overview is done about the activity of ISTC in a direction concerned with improving powerful laser beam quality by means of nonlinear and linear adaptive optics methods. Completed projects #0591 and #1929 resulted in the development of a stimulated Brillouin scattering (SBS) phase conjugation mirror of superhigh fidelity employing the kinoform optical elements (rasters of small lenses) of new generation designed for pulsed or pulse-periodic lasers with nanosecond scale pulse duration. Project #2631 is devoted to development of an adaptive optical system for phase registration and correction of laser beams with wave front vortices. The principles of operation of conventional adaptive systems are based on the assumption that the phase is a smooth continuous function in space. Therefore the solution of the Project tasks will assume a new step in adaptive optics.

  13. Evolution of Ada technology in the flight dynamics area: Implementation/testing phase analysis

    NASA Technical Reports Server (NTRS)

    Quimby, Kelvin L.; Esker, Linda; Miller, John; Smith, Laurie; Stark, Mike; Mcgarry, Frank

    1989-01-01

    An analysis is presented of the software engineering issues related to the use of Ada for the implementation and system testing phases of four Ada projects developed in the flight dynamics area. These projects reflect an evolving understanding of more effective use of Ada features. In addition, the testing methodology used on these projects has changed substantially from that used on previous FORTRAN projects.

  14. Methods to Develop the Eye-tem Bank to Measure Ophthalmic Quality of Life.

    PubMed

    Khadka, Jyoti; Fenwick, Eva; Lamoureux, Ecosse; Pesudovs, Konrad

    2016-12-01

    There is an increasing demand for high-standard, comprehensive, and reliable patient-reported outcome (PRO) instruments in all the disciplines of health care including in ophthalmology and optometry. Over the past two decades, a plethora of PRO instruments have been developed to assess the impact of eye diseases and their treatments. Despite this large number of instruments, significant shortcomings exist for the measurement of ophthalmic quality of life (QoL). Most PRO instruments are short-form instruments designed for clinical use, but this limits their content coverage often poorly targeting any study population other than that which they were developed for. Also, existing instruments are static paper and pencil based and unable to be updated easily leading to outdated and irrelevant item content. Scores obtained from different PRO instruments may not be directly comparable. These shortcomings can be addressed using item banking implemented with computer-adaptive testing (CAT). Therefore, we designed a multicenter project (The Eye-tem Bank project) to develop and validate such PROs to enable comprehensive measurement of ophthalmic QoL in eye diseases. Development of the Eye-tem Bank follows four phases: Phase I, Content Development; Phase II, Pilot Testing and Item Calibration; Phase III, Validation; and Phase IV, Evaluation. This project will deliver technologically advanced comprehensive QoL PROs in the form of item banking implemented via a CAT system in eye diseases. Here, we present a detailed methodological framework of this project.

  15. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BEVINS, R.R.

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated duringmore » the second phase of the W314 Project to cover the second phase of the project's scope.« less

  16. 14 CFR 1216.304 - Major decision points.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have fewer, less well-defined phases, but can still be characterized by phases representing general or...

  17. Principle Findings from Development of a Recirculated Exhaust Gas Intake Sensor (REGIS) Enabling Cost-Effective Fuel Efficiency Improvement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schnabel, Claus

    Kick-off of the Bosch scope of work for the REGIS project started in October 2012. The primary work-packages included in the Bosch scope of work were the following: overall project management, development of the EGR sensor (design of sensor element, design of protection tube, and design of mounting orientation), development of EGR system control strategy, build-up of prototype sensors, evaluation of system performance with the new sensor and the new control strategy, long-term durability testing, and development of a 2nd generation sensor concept for continued technology development after the REGIS project. The University of Clemson was a partner with Boschmore » in the REGIS project. The Clemson scope of work for the REGIS project started in June 2013. The primary work-packages included in the Clemson scope of work were the following: development of EGR system control strategy, and evaluation of system performance with the new sensor and new control strategy. This project was split into phase I, phase II and phase III. Phase I work was completed by the end of June 2014 and included the following primary work packages: development of sensor technical requirements, assembly of engine testbench at Clemson, design concept for sensor housing, connector, and mounting orientation, build-up of EGR flow test benches at Bosch, and build-up of first sensor prototypes. Phase II work was completed by the end of June 2015 and included the following primary work pack ages: development of an optimizing function and demonstration of robustness of sensor, system control strategy implementation and initial validation, completion of engine in the loop testing of developed control algorithm, completion of sensor testing including characteristic line, synthetic gas test stand, and pressure dependency characterization, demonstration of benefits of control w/o sensing via simulation, development of 2nd generation sensor concept. Notable technical achievements from phase II were the following: publication of two new technical papers by Clemson detailing the control strategies used for the EGR system control. The two papers was published in the 2016 SAE World Congress in April 2016. The titles of each paper are, “Physics-Based Exhaust Pressure and Temperature Estimation for Low Pressure EGR Control in Turbocharged Gasoline Engines,” by K. Siokos, and “A Control Algorithm for Low Pressure – EGR Systems using a Smith Predictor with Intake Oxygen Sensor Feedback”, by R. Koli. All phase III work packages have been completed. The primary work packages in phase III were the following: completion of long-term sensor durability testing, final demonstration of benefits of EGR control w/o sensing, final decision of the second generation sensor development path.« less

  18. Magnetic sensor for nondestructive evaluation of deteriorated prestressing strand : phase II.

    DOT National Transportation Integrated Search

    2011-08-01

    This report gives an account of the execution and achievements in Phase II of the project completed through August 2011. The main objective of this project is to advance the practical development of a nondestructive testing and evaluation method usin...

  19. Applications of phase-contrast x-ray imaging to medicine using an x-ray interferometer

    NASA Astrophysics Data System (ADS)

    Momose, Atsushi; Yoneyama, Akio; Takeda, Tohoru; Itai, Yuji; Tu, Jinhong; Hirano, Keiichi

    1999-10-01

    We are investigating possible medical applications of phase- contrast X-ray imaging using an X-ray interferometer. This paper introduces the strategy of the research project and the present status. The main subject is to broaden the observation area to enable in vivo observation. For this purpose, large X-ray interferometers were developed, and 2.5 cm X 1.5 cm interference patterns were generated using synchrotron X-rays. An improvement of the spatial resolution is also included in the project, and an X-ray interferometer designed for high-resolution phase-contrast X-ray imaging was fabricated and tested. In parallel with the instrumental developments, various soft tissues are observed by phase- contrast X-ray CT to find correspondence between the generated contrast and our histological knowledge. The observation done so far suggests that cancerous tissues are differentiated from normal tissues and that blood can produce phase contrast. Furthermore, this project includes exploring materials that modulate phase contrast for selective imaging.

  20. Variational Transition State Theory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Truhlar, Donald G.

    2016-09-29

    This is the final report on a project involving the development and applications of variational transition state theory. This project involved the development of variational transition state theory for gas-phase reactions, including optimized multidimensional tunneling contributions and the application of this theory to gas-phase reactions with a special emphasis on developing reaction rate theory in directions that are important for applications to combustion. The development of variational transition state theory with optimized multidimensional tunneling as a useful computational tool for combustion kinetics involved eight objectives.

  1. Expression patterns of Eph genes in the "dual visual development" of the lamprey and their significance in the evolution of vision in vertebrates.

    PubMed

    Suzuki, Daichi G; Murakami, Yasunori; Yamazaki, Yuji; Wada, Hiroshi

    2015-01-01

    Image-forming vision is crucial to animals for recognizing objects in their environment. In vertebrates, this type of vision is achieved with paired camera eyes and topographic projection of the optic nerve. Topographic projection is established by an orthogonal gradient of axon guidance molecules, such as Ephs. To explore the evolution of image-forming vision in vertebrates, lampreys, which belong to the basal lineage of vertebrates, are key animals because they show unique "dual visual development." In the embryonic and pre-ammocoete larval stage (the "primary" phase), photoreceptive "ocellus-like" eyes develop, but there is no retinotectal optic nerve projection. In the late ammocoete larval stage (the "secondary" phase), the eyes grow and form into camera eyes, and retinotectal projection is newly formed. After metamorphosis, this retinotectal projection in adult lampreys is topographic, similar to that of gnathostomes. In this study, we explored the involvement of Ephs in lamprey "dual visual development" and establishment of the image-form vision. We found that gnathostome-like orthogonal gradient expression was present in the retina during the "secondary" phase; i.e., EphB showed a gradient of expression along the dorsoventral axis, while EphC was expressed along the anteroposterior axis. However, no orthogonal gradient expression was observed during the "primary" phase. These observations suggest that Ephs are likely recruited de novo for the guidance of topographical "second" optic nerve projection. Transformations during lamprey "dual visual development" may represent "recapitulation" from a protochordate-like ancestor to a gnathostome-like vertebrate ancestor. © 2015 Wiley Periodicals, Inc.

  2. Development and testing of responder : phase III.

    DOT National Transportation Integrated Search

    2017-06-28

    This report documents the research project Development and Testing of Responder Phase III. Under previous research, a Responder system has been developed to provide relevant and timely information to first responders, allow responders to provid...

  3. Space-Based Telemetry and Range Safety Project Ku-Band and Ka-Band Phased Array Antenna

    NASA Technical Reports Server (NTRS)

    Whiteman, Donald E.; Valencia, Lisa M.; Birr, Richard B.

    2005-01-01

    The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to increase data rates and flexibility and decrease costs by using space-based communications assets for telemetry during launches and landings. Phase 1 used standard S-band antennas with the Tracking and Data Relay Satellite System to obtain a baseline performance. The selection process and available resources for Phase 2 resulted in a Ku-band phased array antenna system. Several development efforts are under way for a Ka-band phased array antenna system for Phase 3. Each phase includes test flights to demonstrate performance and capabilities. Successful completion of this project will result in a set of communications requirements for the next generation of launch vehicles.

  4. Ku- and Ka-Band Phased Array Antenna for the Space-Based Telemetry and Range Safety Project

    NASA Technical Reports Server (NTRS)

    Whiteman, Donald E.; Valencia, Lisa M.; Birr, Richard B.

    2005-01-01

    The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to increase data rates and flexibility and decrease costs by using space-based communications assets for telemetry during launches and landings. Phase 1 used standard S-band antennas with the Tracking and Data Relay Satellite System to obtain a baseline performance. The selection process and available resources for Phase 2 resulted in a Ku-band phased array antenna system. Several development efforts are under way for a Ka-band phased array antenna system for Phase 3. Each phase includes test flights to demonstrate performance and capabilities. Successful completion of this project will result in a set of communications requirements for the next generation of launch vehicles.

  5. Near-real-time data fusion, phase 2

    DOT National Transportation Integrated Search

    1999-10-01

    Report developed under SBIR contract for topic N93-084. In Phase I of this project, we explored several different approaches to Near-Real-Time Data Fusion (NRTDF), and in Phase II we developed the most promising architecture into a prototype NRTDF sy...

  6. Programmatic Agreements for Project-Level Air Quality Analyses : NCHRP 25-25 Task 78

    DOT National Transportation Integrated Search

    2015-09-01

    The research performed under Task 78 was divided into two phases. The first phase involved development of a draft Programmatic Agreement (PA) template and a draft Technical Support Document (TSD) template for project-level carbon monoxide (CO) hot-sp...

  7. Investigating the effects of roadway design on driver behavior : applications for Minnesota highway design

    DOT National Transportation Integrated Search

    1999-02-01

    This report details a project to study the relationship between highway design and human behavior as influenced by roadside environments. The project was developed in two phases. In the visualization phase, computer simulation was used to model an ac...

  8. A School-Community Career Education Project. Final Report.

    ERIC Educational Resources Information Center

    Opelika City Schools, AL.

    The 3-year Opelika City (Alabama) School-Community Career Education Project sought to make career education central and not just an adjunct to the education program in Opelika schools. Development of the project was carried out through four phases: (1) Staff training and development, (2) curriculum development and revisions, (3) guidance, and (4)…

  9. Protocol Development for the NASA-JSC Lunar-Mars Life Support Test Project (LMLSTP) Phase 3 Project: A Report on Baseline Studies at KSC for Continuous Salad Production

    NASA Technical Reports Server (NTRS)

    Goins, G. D.; Yorio, N. C.; Vivenzio, H. R.

    1998-01-01

    The Phase 3 Lunar-Mars Life Support Test Project (LMLSTP) was conducted in a 20-foot chamber at Johnson Space Center. The overall objective of the Phase 3 project was to conduct a 90-day regenerative life support system test involving 4 human subjects to demonstrate an integrated biological and physicochemical life support system. A secondary objective of the Phase 3 LMLSTP was to demonstrate the ability to produce salad-type vegetable by integration of a small benchtop growth chamber located within the crew habitat area. This small chamber, commercially manufactured as the Controlled Environment Research Ecosystem (CERES 2010(TM)), functioned as a means to continuously provide fresh lettuce crops for crew members. The CERES 2010(TM) growth chamber utilized hardware components developed for effective plant biomass production in spaceflight applications. These components included: (1) LED lighting; (2) Astroculture(TM) Root Trays; and (3) Zeoponic media. In planning for the LMLSTP Phase 3, a request was put forward for KSC scientists to generate a protocol for successful continuous planting, culturing, and harvesting of the salad-crop, lettuce. By conducting baseline tests with components of the CERES 2010(TM), a protocol was developed.

  10. NERI Project 99-119. A New Paradigm for Automatic Development of Highly Reliable Control Architectures for Nuclear Power Plants. Phase-2 Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    March-Leuba, JA

    2002-01-15

    This report describes the tasks performed and the progress made during Phase 2 of the DOE-NERI project number 99-119 entitled Automatic Development of Highly Reliable Control Architecture for Future Nuclear Power Plants. This project is a collaboration effort between the Oak Ridge National Laboratory (ORNL), The University of Tennessee, Knoxville (UTK) and the North Carolina State University (NCSU). ORNL is the lead organization and is responsible for the coordination and integration of all work.

  11. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    NASA Technical Reports Server (NTRS)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  12. Road-testing the outreach best practices manual: Applicability for implementation of the development phase projects by the regional carbon sequestration partnerships

    USGS Publications Warehouse

    Daly, D.; Bradbury, J.; Garrett, G.; Greenberg, S.; Myhre, R.; Peterson, T.; Tollefson, L.; Wade, S.; Sacuta, N.

    2011-01-01

    Geologic carbon dioxide (CO2) storage verification tests by the U.S. Department of Energy's (DOE's) seven Regional Carbon Sequestration Partnerships (RCSPs) provided the experience base for the Public Outreach and Education for Carbon Storage Projects, a best practices manual, published in December 2009. This paper summarizes these outreach best practices; discusses their application in Aquistorc, a grcenficld CO2 storage project under way in western Canada; and reviews the implications for applying the best practices to new projects during the Development Phase of the DOE's RCSP Program. ?? 2011 Published by Elsevier Ltd.

  13. Developing a Long-term Monitoring Program with Undergraduate Students in Marine Sciences

    NASA Astrophysics Data System (ADS)

    Anders, T. M.; Boryta, M. D.

    2015-12-01

    A goal of our growing marine geoscience program at Mt. San Antonio College is to involve our students in all stages of developing and running an undergraduate research project. During the initial planning phase, students develop and test their proposals. Instructor-set parameters were chosen carefully to help guide students toward manageable projects but to not limit their creativity. Projects should focus on long-term monitoring of a coastal area in southern California. During the second phase, incoming students will critique the initial proposals, modify as necessary and continue to develop the project. We intend for data collection opportunities to grow from geological and oceanographic bases to eventually include other STEM topics in biology, chemistry, math and GIS. Questions we will address include: What makes this a good research project for a community college? What are the costs and time commitments involved? How will the project benefit students and society? Additionally we will share our initial results, challenges, and unexpected pitfalls and benefits.

  14. Impact of agile methodologies on team capacity in automotive radio-navigation projects

    NASA Astrophysics Data System (ADS)

    Prostean, G.; Hutanu, A.; Volker, S.

    2017-01-01

    The development processes used in automotive radio-navigation projects are constantly under adaption pressure. While the software development models are based on automotive production processes, the integration of peripheral components into an automotive system will trigger a high number of requirement modifications. The use of traditional development models in automotive industry will bring team’s development capacity to its boundaries. The root cause lays in the inflexibility of actual processes and their adaption limits. This paper addresses a new project management approach for the development of radio-navigation projects. The understanding of weaknesses of current used models helped us in development and integration of agile methodologies in traditional development model structure. In the first part we focus on the change management methods to reduce request for change inflow. Established change management risk analysis processes enables the project management to judge the impact of a requirement change and also gives time to the project to implement some changes. However, in big automotive radio-navigation projects the saved time is not enough to implement the large amount of changes, which are submitted to the project. In the second phase of this paper we focus on increasing team capacity by integrating at critical project phases agile methodologies into the used traditional model. The overall objective of this paper is to prove the need of process adaption in order to solve project team capacity bottlenecks.

  15. Self-consolidating concrete, applications for slip-form paving : phase II.

    DOT National Transportation Integrated Search

    2011-05-01

    The goal of the project was to develop a new type of self-consolidating concrete (SCC) for slip-form paving to simplify construction and make smoother pavements. Developing the new SCC involved two phases: a feasibility study (Phase I sponsored by TP...

  16. Project Development Model | Integrated Energy Solutions | NREL

    Science.gov Websites

    . The five elements of project fundamentals are: Baseline: Analyze the current situation for the site . The two-phase iterative model includes elements in project fundamentals and project development based State and Local Energy Data (SLED) tool, developed by NREL for the U.S. Department of Energy, to get

  17. The Development of Students' Mental Models of Chemical Substances and Processes at the Molecular Level

    NASA Astrophysics Data System (ADS)

    Dalton, Rebecca Marie

    The development of student's mental models of chemical substances and processes at the molecular level was studied in a three-phase project. Animations produced in the VisChem project were used as an integral part of the chemistry instruction to help students develop their mental models. Phase one of the project involved examining the effectiveness of using animations to help first-year university chemistry students develop useful mental models of chemical phenomena. Phase two explored factors affecting the development of student's mental models, analysing results in terms of a proposed model of the perceptual processes involved in interpreting an animation. Phase three involved four case studies that served to confirm and elaborate on the effects of prior knowledge and disembedding ability on student's mental model development, and support the influence of study style on learning outcomes. Recommendations for use of the VisChem animations, based on the above findings, include: considering the prior knowledge of students; focusing attention on relevant features; encouraging a deep approach to learning; using animation to teach visual concepts; presenting ideas visually, verbally and conceptually; establishing 'animation literacy'; minimising cognitive load; using animation as feedback; using student drawings; repeating animations; and discussing 'scientific modelling'.

  18. 14 CFR 1216.304 - Major decision points.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical, economic, and other factors, in the earliest planning. At that stage, the responsible... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have...

  19. Development of the digital design environment ProjectWise(TM) - phase 1.

    DOT National Transportation Integrated Search

    2017-04-28

    The goal of this research was to develop a project document management system capable of managing : Connecticut Department of Transportation (CTDOT) Capital Road and Bridge Program. Primary targets of : research and development included the system, c...

  20. NOx Emissions Characteristics and Correlation Equations of Two P and W's Axially Staged Sector Combustors Developed Under NASA Environmentally Responsible Aviation (ERA) Project

    NASA Technical Reports Server (NTRS)

    He, Zhuohui J.

    2017-01-01

    Two P&W (Pratt & Whitney)'s axially staged sector combustors have been developed under NASA's Environmentally Responsible Aviation (ERA) project. One combustor was developed under ERA Phase I, and the other was developed under ERA Phase II. Nitrogen oxides (NOx) emissions characteristics and correlation equations for these two sector combustors are reported in this article. The Phase I design was to optimize the NOx emissions reduction potential, while the Phase II design was more practical and robust. Multiple injection points and fuel staging strategies are used in the combustor design. Pilot-stage injectors are located on the front dome plate of the combustor, and main-stage injectors are positioned on the top and bottom (Phase I) or on the top only (Phase II) of the combustor liners downstream. Low power configuration uses only pilot-stage injectors. Main-stage injectors are added to high power configuration to help distribute fuel more evenly and achieve lean burn throughout the combustor yielding very low NOx emissions. The ICAO (International Civil Aviation Organization) landing-takeoff NOx emissions are verified to be 88 percent (Phase I) and 76 percent (Phase II) under the ICAO CAEP/6 (Committee on Aviation Environmental Protection 6th Meeting) standard, exceeding the ERA project goal of 75 percent reduction, and the combustors proved to have stable combustion with room to maneuver on fuel flow splits for operability.

  1. Eggen Card Project: Progress and Plans (Abstract)

    NASA Astrophysics Data System (ADS)

    Silvis, G.

    2016-12-01

    (Abstract only) The Eggen Card Project has been running since 2009 and has involved 30+ AAVSO staff and volunteers. Let me offer a short review of the project, our progress this year and our plans for the future. Phase 1 of the project has been to index the 108,000 card images, identifying the stars they belong too. We've passed the 75% point on this phase. The next phase is how to use this data. Jack Crast has identified the photometric schemes used by Olin and developed a spreadsheet tool to prepare this data for inclusion into the AAVSO International Database (AID). Anyone want good photometry from 1970? We got it!

  2. Iran Sanctions

    DTIC Science & Technology

    2009-07-09

    partners, Gazprom of Russia and Petronas of Malaysia to develop phases 2 and 3 of the 25-phase South Pars gas field. The EU pledged to increase cooperation...their investments to other companies. On July 12, 2008, Total and Petronas , the original South Pars investors, pulled out of a deal to develop a...not exceed the $20 million in one year threshold for ISA sanctionability. Since the Total/ Petronas /Gazprom project in 1998, no projects have been

  3. Image Matrix Processor for Volumetric Computations Final Report CRADA No. TSB-1148-95

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberson, G. Patrick; Browne, Jolyon

    The development of an Image Matrix Processor (IMP) was proposed that would provide an economical means to perform rapid ray-tracing processes on volume "Giga Voxel" data sets. This was a multi-phased project. The objective of the first phase of the IMP project was to evaluate the practicality of implementing a workstation-based Image Matrix Processor for use in volumetric reconstruction and rendering using hardware simulation techniques. Additionally, ARACOR and LLNL worked together to identify and pursue further funding sources to complete a second phase of this project.

  4. NASA's In-Space Manufacturing Project: Materials and Manufacturing Process Development Update

    NASA Technical Reports Server (NTRS)

    Prater, Tracie; Bean, Quincy; Werkheiser, Niki; Ledbetter, Frank

    2017-01-01

    The mission of NASA's In-Space Manufacturing (ISM) project is to identify, design, and implement on-demand, sustainable manufacturing solutions for fabrication, maintenance and repair during exploration missions. ISM has undertaken a phased strategy of incrementally increasing manufacturing capabilities to achieve this goal. The ISM project began with the development of the first 3D printer for the International Space Station. To date, the printer has completed two phases of flight operations. Results from phase I specimens indicated some differences in material properties between ground-processed and ISS-processed specimens, but results of follow-on analyses of these parts and a ground-based study with an equivalent printer strongly indicate that this variability is likely attributable to differences in manufacturing process settings between the ground and flight prints rather than microgravity effects on the fused deposition modeling (FDM) process. Analysis of phase II specimens from the 3D Printing in Zero G tech demo, which shed further light on the sources of material variability, will be presented. The ISM project has also developed a materials characterization plan for the Additive Manufacturing Facility, the follow-on commercial multimaterial 3D printing facility developed for ISS by Made in Space. This work will yield a suite of characteristic property values that can inform use of AMF by space system designers. Other project activities include development of an integrated 3D printer and recycler, known as the Refabricator, by Tethers Unlimited, which will be operational on ISS in 2018. The project also recently issued a broad area announcement for a multimaterial fabrication laboratory, which may include in-space manufacturing capabilities for metals, electronics, and polymeric materials, to be deployed on ISS in the 2022 timeframe.

  5. Measuring the quality of life of people with dementia in nursing homes in Germany - the study protocol for the Qol-Dem Project.

    PubMed

    Dichter, Martin Nikolaus; Halek, Margareta; Dortmann, Olga; Meyer, Gabriele; Bartholomeyczik, Sabine

    2013-01-01

    QUALIDEM is a standardized dementia-specific quality of life (Qol) measurement, which was developed and validated in the Netherlands. A German version has been available since 2008. This study protocol describes the design and methodology for the quality of life of people with dementia (Qol-Dem) project. This project aims to evaluate the reliability and validity of the German version of the QUALIDEM. Due to the lack of both a universal definition of Qol and of standards to verify the validity of Qol measurements, this study is divided into three phases. The aim of the first theoretical phase is the development of a dementia-specific Qol model as a result of a meta-synthesis of qualitative studies. The second empirical phase consists of the three following steps: (a) an investigation of the scalability and internal consistency of the measure, (b) an evaluation of the interrater and intrarater reliability, and (c) an extensive evaluation of the validity of the QUALIDEM. The resulting Qol model (phase 1) will be used for the selection of appropriate comparators for validity testing. In the third phase, the QUALIDEM will be adapted, if necessary, based on the knowledge generated in the first two phases. The findings of the Qol-Dem project should deliver an accurate assessment of the psychometric properties of the German version of the QUALIDEM. The results will contribute to the further development of the instrument. Furthermore, the results will contribute to the theoretical development of the concept of Qol among people with dementia.

  6. Dental Laboratory Technology. Project Report Phase I with Research Findings.

    ERIC Educational Resources Information Center

    Sappe', Hoyt; Smith, Debra S.

    This report provides results of Phase I of a project that researched the occupational area of dental laboratory technology, established appropriate committees, and conducted task verification. These results are intended to guide development of a program designed to train dental laboratory technicians. Section 1 contains general information:…

  7. Environmental Horticulture. Project Report Phase I with Research Findings.

    ERIC Educational Resources Information Center

    Bachler, Mike; Sappe', Hoyt

    This report provides results of Phase I of a project that researched the occupational area of environmental horticulture, established appropriate committees, and conducted task verification. These results are intended to guide development of a program designed to address the needs of the horticulture field. Section 1 contains general information:…

  8. Competency-Based Occupational Programs: Identification, Structuring, and Evaluation.

    ERIC Educational Resources Information Center

    Pensacola Junior Coll., FL.

    This publication presents results of the third phase of a Pensacola Junior College project to develop certain vocational programs as competency-based education. A brief narrative discusses the entire project--especially phase 3, which involved identification and definition of those competencies expected by an employer using input from an advisory…

  9. 75 FR 5291 - Office of Special Education and Rehabilitative Services; Overview Information; Technology and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... two phases: (1) Development and (2) research on effectiveness. Abstracts of projects funded under... approaches. Phase 2 projects must subject technology-based approaches to rigorous field-based research to... disabilities; (2) Present a justification, based on scientifically rigorous research or theory, that supports...

  10. 76 FR 12343 - Technology and Media Services for Individuals With Disabilities-Steppingstones of Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ... two phases: (1) Development and (2) research on effectiveness. Abstracts of projects funded under... approaches. Phase 2 projects must subject technology-based approaches to rigorous field-based research to... scientifically rigorous research or theory, that demonstrates the potential effectiveness of the technology-based...

  11. Instrumentation Technology. Project Report Phase I with Research Findings.

    ERIC Educational Resources Information Center

    Sappe', Hoyt; Squires, Sheila S.

    This report provides results of Phase I of a project that researched the occupational area of instrumentation technology, established appropriate committees, and conducted task verification. These results are intended to guide development of a program designed to train instrumentation technicians. Section 1 contains general information: purpose of…

  12. Evaluation of Deicer Impacts on Pervious Concrete Specimens (Phase II)

    DOT National Transportation Integrated Search

    2018-05-01

    This research examined the chemical degradation of pervious concrete due to calcium chloride or magnesium chloride deicers. The project consisted of Phase I, Phase IIa, and Phase IIb. Phase I was previous work where a testing protocol was developed t...

  13. ISTC Projects from RFNC-VNIIEF Devoted to Improving Laser Beam Quality

    NASA Astrophysics Data System (ADS)

    Starikov, F.; Kochemasov, G.

    Information is given about the Projects # 1929 and # 2631 supported by ISTC and concerned with improving laser beam quality and interesting for adaptive optics community. One of them, Project # 1929 has been recently finished. It has been devoted to development of an SBS phase conjugation mirror of superhigh conjugation quality employing the kinoform optics for high-power lasers with nanosecond scale pulse duration. With the purpose of reaching ideal PC fidelity, the SBS mirror includes the raster of small lenses that has been traditionally used as the lenslet in Shack-Hartmann wavefront sensor in adaptive optics. The second of them, Project # 2631, is concerned with the development of an adaptive optical system for phase correction of laser beams with wavefront vortex. The principles of operation of modern adaptive systems are based on the assumption that the phase is a smooth continuous function in space. Therefore the solution of the Project tasks will assume a new step in adaptive optics.

  14. WVU Hydrogen Fuel Dispensing Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, William

    2015-09-01

    The scope of this project was changed during the course of the project. Phase I of the project was to construct a site similar to the site at Central West Virginia Regional Airport in Charleston, WV to show that duplication of the site was a feasible method of conducting hydrogen stations. Phase II of the project was necessitated due to a lack of funding that was planned for the development of the station in Morgantown. The US Department of Energy determined that the station in Charleston would be dismantled and moved to Morgantown and reassembled at the Morgantown site. Thismore » necessitated storage of the components of the station for almost a year at the NAFTC Headquarters which caused a number of issues with the equipment that will be discussed in later portions of this report. This report will consist of PHASE I and PHASE II with discussions on each of the tasks scheduled for each phase of the project.« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  16. Configuration-shape-size optimization of space structures by material redistribution

    NASA Technical Reports Server (NTRS)

    Vandenbelt, D. N.; Crivelli, L. A.; Felippa, C. A.

    1993-01-01

    This project investigates the configuration-shape-size optimization (CSSO) of orbiting and planetary space structures. The project embodies three phases. In the first one the material-removal CSSO method introduced by Kikuchi and Bendsoe (KB) is further developed to gain understanding of finite element homogenization techniques as well as associated constrained optimization algorithms that must carry along a very large number (thousands) of design variables. In the CSSO-KB method an optimal structure is 'carved out' of a design domain initially filled with finite elements, by allowing perforations (microholes) to develop, grow and merge. The second phase involves 'materialization' of space structures from the void, thus reversing the carving process. The third phase involves analysis of these structures for construction and operational constraints, with emphasis in packaging and deployment. The present paper describes progress in selected areas of the first project phase and the start of the second one.

  17. Helping Families Adjust to Economic Change. A Project Report.

    ERIC Educational Resources Information Center

    Matejic, Denise M.

    A project was developed to gain more insight into family financial problems, to identify these problems, and to formulate educational strategies to deal with and help solve these problems. This project was conducted in three phases, which included community outreach, development of educational materials, and evaluation. Three communities with…

  18. EUDISED Project: Present State and Development Prospects.

    ERIC Educational Resources Information Center

    Council for Cultural Cooperation, Strasbourg (France).

    A summary of the European Documentation and Information System for Education (EUDISED) March 1977 meeting describes the present state of the project and discussion of suggestions for future development. The preparatory phase of the project will be concluded in 1977 and ready for implementation; however, the present financial situation makes it…

  19. Public transportation : better data needed to assess length of New Starts process, and options exist to expedite project development.

    DOT National Transportation Integrated Search

    2009-08-01

    The New Starts program is an important source of new capital investment in mass transportation. To be eligible for federal funding, a project must advance through the different project development phases of the New Starts program, including alternati...

  20. Advanced Mirror Technology Development (AMTD) Project Status

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip

    2014-01-01

    To date, AMTD Phase 1 has accomplished all of its technical tasks on-schedule and on-budget. AMTD was awarded a Phase 2 contract. We are now performing Phase 2 tasks along with those tasks continued from Phase 1.

  1. Development of Simultaneous Beta-and-Coincidence-Gamma Imager for Plant Imaging Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tai, Yuan-Chuan

    2016-09-30

    The goal of this project is to develop a novel imaging system that can simultaneously acquire beta and coincidence gamma images of positron sources in thin objects such as leaves of plants. This hybrid imager can be used to measure carbon assimilation in plants quantitatively and in real-time after C-11 labeled carbon-dioxide is administered. A better understanding of carbon assimilation, particularly under the increasingly elevated atmospheric CO 2 level, is extremely critical for plant scientists who study food crop and biofuel production. Phase 1 of this project is focused on the technology development with 3 specific aims: (1) develop amore » hybrid detector that can detect beta and gamma rays simultaneously; (2) develop an imaging system that can differentiate these two types of radiation and acquire beta and coincidence gamma images in real-time; (3) develop techniques to quantify radiotracer distribution using beta and gamma images. Phase 2 of this project is to apply technologies developed in phase 1 to study plants using positron-emitting radionuclide such as 11C to study carbon assimilation in biofuel plants.« less

  2. Special Advanced Studies for Pollution Prevention. Delivery Order 0058: The Monitor - Spring 2000

    DTIC Science & Technology

    2001-04-01

    Process complexity ➨ Strippability ➨ Maturity ➨ Process type and chemistry ➨ Licensing requirements ➨ Vendor information ➨ Niplate 700 (Surface...Courses of Action 4 Identify & Evaluate Potential Alternatives 5 Select Best Alternative & Develop Project 6 Prioritize Projects by Commodity 7 Rank...Burden CS Priority Process Specific P2 OASolution Selection Solution Planning Solution Implementation Solution Evaluation Phase 2 Phase 3 Phase 1

  3. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less

  4. Contextualizing and assessing the social capital of seniors in congregate housing residences: study design and methods

    PubMed Central

    Moore, Spencer; Shiell, Alan; Haines, Valerie; Riley, Therese; Collier, Carrie

    2005-01-01

    Background This article discusses the study design and methods used to contextualize and assess the social capital of seniors living in congregate housing residences in Calgary, Alberta. The project is being funded as a pilot project under the Institute of Aging, Canadian Institutes for Health Research. Design/Methods Working with seniors living in 5 congregate housing residencies in Calgary, the project uses a mixed method approach to develop grounded measures of the social capital of seniors. The project integrates both qualitative and quantitative methods in a 3-phase research design: 1) qualitative, 2) quantitative, and 3) qualitative. Phase 1 uses gender-specific focus groups; phase 2 involves the administration of individual surveys that include a social network module; and phase 3 uses anamolous-case interviews. Not only does the study design allow us to develop grounded measures of social capital but it also permits us to test how well the three methods work separately, and how well they fit together to achieve project goals. This article describes the selection of the study population, the multiple methods used in the research and a brief discussion of our conceptualization and measurement of social capital. PMID:15836784

  5. Telecentric 3D profilometry based on phase-shifting fringe projection.

    PubMed

    Li, Dong; Liu, Chunyang; Tian, Jindong

    2014-12-29

    Three dimensional shape measurement in the microscopic range becomes increasingly important with the development of micro manufacturing technology. Microscopic fringe projection techniques offer a fast, robust, and full-field measurement for field sizes from approximately 1 mm2 to several cm2. However, the depth of field is very small due to the imaging of non-telecentric microscope, which is often not sufficient to measure the complete depth of a 3D-object. And the calibration of phase-to-depth conversion is complicated which need a precision translation stage and a reference plane. In this paper, we propose a novel telecentric phase-shifting projected fringe profilometry for small and thick objects. Telecentric imaging extends the depth of field approximately to millimeter order, which is much larger than that of microscopy. To avoid the complicated phase-to-depth conversion in microscopic fringe projection, we develop a new system calibration method of camera and projector based on telecentric imaging model. Based on these, a 3D reconstruction of telecentric imaging is presented with stereovision aided by fringe phase maps. Experiments demonstrated the feasibility and high measurement accuracy of the proposed system for thick object.

  6. The Western New York Health Resources Project: developing access to local health information.

    PubMed

    Gray, S A; O'Shea, R; Petty, M E; Loonsk, J

    1998-07-01

    The Western New York Health Resources Project was created to fill a gap in online access to local health information resources describing the health of a defined geographic area. The project sought to identify and describe information scattered among many institutions, agencies, and individuals, and to create a database that would be widely accessible. The project proceeded in three phases with initial phases supported by grant funding. This paper describes the database development and selection of content, and concludes that a national online network of local health data representing the various geographic regions of the United States would contribute to the quality of health care in general.

  7. The Western New York Health Resources Project: developing access to local health information.

    PubMed Central

    Gray, S A; O'Shea, R; Petty, M E; Loonsk, J

    1998-01-01

    The Western New York Health Resources Project was created to fill a gap in online access to local health information resources describing the health of a defined geographic area. The project sought to identify and describe information scattered among many institutions, agencies, and individuals, and to create a database that would be widely accessible. The project proceeded in three phases with initial phases supported by grant funding. This paper describes the database development and selection of content, and concludes that a national online network of local health data representing the various geographic regions of the United States would contribute to the quality of health care in general. PMID:9681168

  8. Fiber-optic projected-fringe digital interferometry

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Beheim, Glenn

    1990-01-01

    A phase-stepped projected-fringe interferometer was developed which uses a closed-loop fiber-optic phase-control system to make very accurate surface profile measurements. The closed-loop phase-control system greatly reduces phase-stepping error, which is frequently the dominant source of error in digital interferometers. Two beams emitted from a fiber-optic coupler are combined to form an interference fringe pattern on a diffusely reflecting object. Reflections off of the fibers' output faces are used to create a phase-indicating signal for the closed-loop optical phase controller. The controller steps the phase difference between the two beams by pi/2 radians in order to determine the object's surface profile using a solid-state camera and a computer. The system combines the ease of alignment and automated data reduction of phase-stepping projected-fringe interferometry with the greatly improved phase-stepping accuracy of our closed-loop phase-controller. The system is demonstrated by measuring the profile of a plate containing several convex surfaces whose heights range from 15 to 25 micron high.

  9. The DOE/Gosatomnadzor collaboration, Project 3: Providing equipment and support for Gosatomnadzor inspection activities in Russia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoida, H.W.; Lanier, R.; Schultz, F.

    1997-12-31

    Project 3 consists of two subprojects: Project 3.1 -- providing Materials Control and Accounting (MC and A) equipment to GAN inspectors; and Project 3.2 -- the development of Russian indigenous MC and A equipment capability for GAN. The objective of Project 3.1 is to provide equipment for use by GAN inspectors during independent inspections of facilities that contain direct-use material. To accomplish this, Project 3.1 develops the initial training for GAN instructors on the instruments provided by the US and contracts with Safety Limited, a GAN contractor for developing methodologies and procedures for using the equipment and acceptance checkout andmore » delivery. The equipment deliveries were divided into three phases to fit within the DOE budget and priority constraints. With the equipment delivered to the inspectors, Phase 1 is complete. Phase 2 has been started by purchasing and checking out neutron coincidence counting (NCC) equipment at Los Alamos. The GAN instructors have been trained on NCCs, cherenkov vision devices (CVDs), ultrasonic thickness gages (UTGs), and tamper indicating devices (TIDs) at Los Alamos. Phase 3 has been delayed to fiscal year 1999 (FY99) due to budget constraints. Project 3.2 addresses the important issue of sustainability for safeguards equipment in Russia. GAN`s Project 3.2 will help establish indigenous equipment for Russian safeguards. The initial review of Russian manufacturing capabilities for safeguards equipment has been completed and recommendations have been made. To this end, the authors are encouraging US vendors to collaborate with Russian institutes and have contracted with the All-Russia Research Institute of Automatics (VINIIA) and Aquila Technologies to fabricate a Russian Active-Well Coincidence Counter (AWCC) from US parts.« less

  10. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parrish, Kristen

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  11. Dabhol resumes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burr, M.T.

    1997-01-01

    Shockwaves were felt throughout the global business community when political forces in India stalled out the Dabhol power project. Lenders and investors felt even less secure about the risks involved with developing infrastructure projects in emerging economies, and Dabhol came to symbolize the sinkholes that lie in wait for even the best-devised projects with the strongest sponsors. The project resumed in early December, however, after the Bombay High Court dismissed the only remaining lawsuit filed against Dabhol Power Co. Now, the Dabhol project is set to become an example of how a project can succeed in a big way ifmore » it has developers with integrity, skill, flexibility, and--above all--a great deal of patience. Originally a 695 MW facility, Dabhol was renegotiated so the complex totals 2,450 MW, with one 740 MW phase and another 1,710 MW phase. {open_quotes}The additional capacity allowed us to recover the costs we incurred during cancellation,{close_quotes} says Rebecca Mark, CEO of Enron Development Corp. in Houston, Texas. {open_quotes}We reduced rates for the second phase, and we`ll handle it on a competitive basis when it comes to specifying equipment.{close_quotes} Enron is the lead developer of the project, with an 80 percent equity stake. GE Capital of Stamford, Conn., USA, and Bechtel Enterprises of San Francisco, Calif., each hold a 10 percent share in the project. {open_quotes}The changes in the project have had little effect on the financing arrangements. Additional project costs which resulted from the delays were funded by the equity group, and the debt levels and terms remain consistent with those of the original closing,{close_quotes} says Everett Smith III, executive vice president and director-international, for GE Capital Services Structured Finance Group.« less

  12. W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project Phase 1 Definition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Armpriester, Anthony; Smith, Roger; Scheriffius, Jeff

    2014-02-01

    For a secure and sustainable energy future, the United States (U.S.) must reduce its dependence on imported oil and reduce its emissions of carbon dioxide (CO{sub 2}) and other greenhouse gases (GHGs). To meet these strategic challenges, the U.S. wiU have to create fundamentally new technologies with performance levels far beyond what is now possible. Developing advanced post-combustion clean coal technologies for capturing CO{sub 2} from existing coal-fired power plants can play a major role in the country's transition to a sustainable energy future, especially when coupled with CO{sub 2}-enhanced oil recovery (CO{sub 2}-EOR). Pursuant to these goals, NRG Energy,more » Inc. (NRG) submitted an application and entered into a cost-shared collaboration with the U.S. Department of Energy (DOE) under Round 3 of the Clean Coal Power Initiative (CCPI) to advance low-emission coal technologies. The objective of the NRG W A Parish Post-Combustion CO{sub 2} Capture and Sequestration Demonstration Project is to establish the technical feasibility and economic viability of post-combustion CO{sub 2} capture using flue gas from an existing pulverized coal-fired boiler integrated with geologic sequestration via an enhanced oil recovery (EOR) process. To achieve these objectives, the project will be executed in three phases. Each phase represents a distinct aspect of the project execution. The project phases are: • Phase I. Project Definition/Front-End Engineering Design (FEED) • Phase ll. Detailed Engineering, Procurement & Construction • Phase III. Demonstration and Monitoring The purpose of Phase I is to develop the project in sufficient detail to facilitate the decision-making process in progressing to the next stage of project delivery. Phase n. This report provides a complete summary of the FEED study effort, including pertinent project background information, the scope of facilities covered, decisions, challenges, and considerations made regarding configuration and performance of the facility, along with the conceptual design and estimate results. The findings of this report should be considered conceptual in nature and are conditioned on the statements contained herein. The cost of preparing this report (including the FEED study described herein) was funded in part by a $167-million grant provided by the U.S. DOE.« less

  13. The Photovolatic Manufacturing Technology project (PVMaT) after three years

    NASA Astrophysics Data System (ADS)

    Witt, C. Edwin; Mitchell, Richard L.; Thomas, Holly; Herwig, Lloyd O.

    1994-08-01

    The Photovoltaic Manufacturing Technology project (PVMaT) is a government/industry research and development (R&D) partnership involving joint efforts between the federal government (through the US Department of Energy (DOE)) and members of the US photovoltaic (PV) industry. The project's goal is to assist US industry in retaining and extending its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is being carried out in three separate phases, each designed to address separate R&D requirements for achieving PVMaT goals. Phase 1 was a problem identification phase of about 3 months duration. In Phase 1, the status and needs of the US PV manufacturing industry were identified, and the development of a Phase 2 procurement responsive to the industry's needs was begun. Phase 1 was completed in 1991. Problem solution began in 1992, under Phase 2A, when DOE awarded multiyear subcontracts. Technical accomplishments for PVMaT 2A are presented in this paper. Subcontracts were recently awarded for a second, overlapping, and similar process-specific solicitation (PVMaT 2B). The activities of these new subcontracts are also described. Two subcontracts presently comprise the Phase 3 effort. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. A teamed research approach is being used to improve automated module manufacturing lines and encapsulation materials used in module manufacturing. The first year's work on these subcontracts is also described in this paper.

  14. 2D and 3D X-ray phase retrieval of multi-material objects using a single defocus distance.

    PubMed

    Beltran, M A; Paganin, D M; Uesugi, K; Kitchen, M J

    2010-03-29

    A method of tomographic phase retrieval is developed for multi-material objects whose components each has a distinct complex refractive index. The phase-retrieval algorithm, based on the Transport-of-Intensity equation, utilizes propagation-based X-ray phase contrast images acquired at a single defocus distance for each tomographic projection. The method requires a priori knowledge of the complex refractive index for each material present in the sample, together with the total projected thickness of the object at each orientation. The requirement of only a single defocus distance per projection simplifies the experimental setup and imposes no additional dose compared to conventional tomography. The algorithm was implemented using phase contrast data acquired at the SPring-8 Synchrotron facility in Japan. The three-dimensional (3D) complex refractive index distribution of a multi-material test object was quantitatively reconstructed using a single X-ray phase-contrast image per projection. The technique is robust in the presence of noise, compared to conventional absorption based tomography.

  15. Court procedures for identifying problem drinkers : phase II

    DOT National Transportation Integrated Search

    1971-11-30

    This report summarizes the studies conducted in the first phase of the project and describes the tasks completed in the second phase. The court procedures manual developed in Phase I was reviewed by a panel of experts and subsequently revised. Three ...

  16. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finley, Robert; Payne, William; Kirksey, Jim

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  17. Biomass power for rural development. Technical progress report, January 1, 1997--March 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-II of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less

  18. Biomass power for rural development. Technical progress report, April 1, 1997--June 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-H of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less

  19. Chapter 3: Design of the Saber-Tooth Project.

    ERIC Educational Resources Information Center

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  20. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    NASA Technical Reports Server (NTRS)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  1. Biomass power for rural development. Technical progress report, July 1--September 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the third quarter of 1997, much of the Consortium`s effort has focused on outreach activities, continued feedstock development, fuel supply planning, and fuel contract development, and preparation for 1998 scale-up activities. The Consortium also submitted a Phase-1 extension proposal during this period. A few of the more important milestones are outlined below. The fourth quarter of 1997 is expected to be dominated by Phase-II proposal efforts and planning for 1998 activities.« less

  2. FRACTAL Systems & Project suite: engineering tools for improving development and operation of the systems

    NASA Astrophysics Data System (ADS)

    Pérez-Calpena, A.; Mujica-Alvarez, E.; Osinde-Lopez, J.; García-Vargas, M.

    2008-07-01

    This paper describes the FRACTAL Systems & Projects suite. This suite is composed by several tools (GECO, DOCMA and SUMO) that provide the capabilities that all organizations need to store and manage the system information generated along the project's lifetime, from the design phase to the operation phase. The amount of information that is generated in a project keeps growing in size and complexity along the project's lifetime, to an extent that it becomes impossible to manage it without the aid of specific computer-based tools. The suite described in this paper is the solution developed by FRACTAL to assist the execution of different scientific projects, mainly related with telescopes and instruments, for astronomical research centres. These tools help the system and project engineers to maintain the technical control of the systems and to ensure an optimal use of the resources. GECO eases the control of the system configuration data; DOCMA provides the means to organise and manage the documents generated in the project; SUMO allows managing and scheduling the operation, the maintenance activities and the resources during the operational phase of a system. These tools improve the project communication making the information available to the authorized users (project team, customers, Consortium's members, etc). Finally and depending on the project needs, these three tools can be used integrated or in an independent manner.

  3. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase two, volume 1 : outreach and commercialization of IRSV prototype.

    DOT National Transportation Integrated Search

    2012-03-01

    The Integrated Remote Sensing and Visualization System (IRSV) was developed in Phase One of this project in order to : accommodate the needs of todays Bridge Engineers at the state and local level. Overall goals of this project are: : Better u...

  4. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  5. Essential KPIs for School Nutrition Program Success

    ERIC Educational Resources Information Center

    Rushing, Keith

    2017-01-01

    Purpose/Objectives: The purpose of the project was to develop a research based resource to support SN professionals in effectively utilizing KPIs to manage their programs. Methods: This project consisted of four phases. In Phase 1, a think tank of eight school nutrition professionals identified the general topic areas and format for the resource.…

  6. Energy Conservation: Field Projects. Phase 2: External Evaluation. Document 1: Report.

    ERIC Educational Resources Information Center

    Stanley Associates, Edmonton (Alberta).

    Objectives of Phase 2: Energy Conservation Field Projects were to: test the generalizability of the energy conservation measures outlined in "Guidelines for Conserving Energy in Alberta Schools" and augment these guidelines as required; develop standards of energy consumption for Alberta schools by school type and size, and on the basis…

  7. Handwriting Implementation Project Study (HIPS). Report #1, Preparation for the Dissemination Phase.

    ERIC Educational Resources Information Center

    Logan, Lloyd; And Others

    The purpose of this report is to provide data on the progress of the Handwriting Implementation Project, which is designed to assist in installing the Beginner's Alphabet and Queensland Modern Cursive Script in Queensland government primary schools. Following an introduction that describes the phases and processes of curriculum development and…

  8. Nanophotonic projection system.

    PubMed

    Aflatouni, Firooz; Abiri, Behrooz; Rekhi, Angad; Hajimiri, Ali

    2015-08-10

    Low-power integrated projection technology can play a key role in development of low-cost mobile devices with built-in high-resolution projectors. Low-cost 3D imaging and holography systems are also among applications of such a technology. In this paper, an integrated projection system based on a two-dimensional optical phased array with fast beam steering capability is reported. Forward biased p-i-n phase modulators with 200MHz bandwidth are used per each array element for rapid phase control. An optimization algorithm is implemented to compensate for the phase dependent attenuation of the p-i-n modulators. Using rapid vector scanning technique, images were formed and recorded within a single snapshot of the IR camera.

  9. Carbon footprint estimator, phase II : volume II - technical appendices.

    DOT National Transportation Integrated Search

    2014-03-01

    The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...

  10. Carbon footprint estimator, phase II : volume I - GASCAP model.

    DOT National Transportation Integrated Search

    2014-03-01

    The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...

  11. Development of Molten-Salt Heat Transfer Fluid Technology for Parabolic Trough Solar Power Plants - Public Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grogan, Dylan C. P.

    2013-08-15

    Executive Summary This Final Report for the "Development of Molten-Salt Heat Transfer Fluid (HTF) Technology for Parabolic Trough Solar Power Plants” describes the overall project accomplishments, results and conclusions. Phase 1 analyzed the feasibility, cost and performance of a parabolic trough solar power plant with a molten salt heat transfer fluid (HTF); researched and/or developed feasible component options, detailed cost estimates and workable operating procedures; and developed hourly performance models. As a result, a molten salt plant with 6 hours of storage was shown to reduce Thermal Energy Storage (TES) cost by 43.2%, solar field cost by 14.8%, and levelizedmore » cost of energy (LCOE) by 9.8% - 14.5% relative to a similar state-of-the-art baseline plant. The LCOE savings range met the project’s Go/No Go criteria of 10% LCOE reduction. Another primary focus of Phase 1 and 2 was risk mitigation. The large risk areas associated with a molten salt parabolic trough plant were addressed in both Phases, such as; HTF freeze prevention and recovery, collector components and piping connections, and complex component interactions. Phase 2 analyzed in more detail the technical and economic feasibility of a 140 MWe,gross molten-salt CSP plant with 6 hours of TES. Phase 2 accomplishments included developing technical solutions to the above mentioned risk areas, such as freeze protection/recovery, corrosion effects of applicable molten salts, collector design improvements for molten salt, and developing plant operating strategies for maximized plant performance and freeze risk mitigation. Phase 2 accomplishments also included developing and thoroughly analyzing a molten salt, Parabolic Trough power plant performance model, in order to achieve the project cost and performance targets. The plant performance model and an extensive basic Engineering, Procurement, and Construction (EPC) quote were used to calculate a real levelized cost of energy (LCOE) of 11.50¢/kWhe , which achieved the Phase 2 Go/No Go target of less than 0.12¢/kWhe. Abengoa Solar has high confidence that the primary risk areas have been addressed in the project and a commercial plant utilizing molten salt is economically and technically feasible. The strong results from the Phase 1 and 2 research, testing, and analyses, summarized in this report, led Abengoa Solar to recommend that the project proceed to Phase 3. However, a commercially viable collector interconnection was not fully validated by the end of Phase 2, combined with the uncertainty in the federal budget, forced the DOE and Abengoa Solar to close the project. Thus the resources required to construct and operate a molten salt pilot plant will be solely supplied by Abengoa Solar.« less

  12. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albert Calderon

    2003-04-28

    This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. U.S. Steel teamed up with Calderon for a joint effort which will last 30 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy.

  13. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albert Calderon

    2003-01-28

    This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. U.S. Steel teamed up with Calderon for a joint effort which will last 30 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy.

  14. UCLA-LANL Reanalysis Project

    NASA Astrophysics Data System (ADS)

    Shprits, Y.; Chen, Y.; Friedel, R.; Kondrashov, D.; Ni, B.; Subbotin, D.; Reeves, G.; Ghil, M.

    2009-04-01

    We present first results of the UCLA-LANL Reanalysis Project. Radiation belt relativistic electron Phase Space Density is obtained using the data assimilative VERB code combined with observations from GEO, CRRES, and Akebono data. Reanalysis of data shows the pronounced peaks in the phase space density and pronounced dropouts of fluxes during the main phase of a storm. The results of the reanalysis are discussed and compared to the simulations with the recently developed VERB 3D code.

  15. Educational Program Development for the Rural Disadvantaged. Research Report.

    ERIC Educational Resources Information Center

    Thomas, Hollie B.; And Others

    As part of a far-reaching research project on educational needs of the rural disadvantaged, this phase of the Rural Education Disadvantaged Youth Project (Project REDY) dealt with the development and evaluation of a vocationally-oriented family-centered educational program. The model program, which was field-tested at a single site, focused upon:…

  16. Innovation Network Development Model in Telemedicine: A Change in Participation.

    PubMed

    Goodarzi, Maryam; Torabi, Mashallah; Safdari, Reza; Dargahi, Hossein; Naeimi, Sara

    2015-10-01

    This paper introduces a telemedicine innovation network and reports its implementation in Tehran University of Medical Sciences. The required conditions for the development of future projects in the field of telemedicine are also discussed; such projects should be based on the common needs and opportunities in the areas of healthcare, education, and technology. The development of the telemedicine innovation network in Tehran University of Medical Sciences was carried out in two phases: identifying the beneficiaries of telemedicine, and codification of the innovation network memorandum; and brainstorming of three workgroup members, and completion and clustering ideas. The present study employed a qualitative survey by using brain storming method. Thus, the ideas of the innovation network members were gathered, and by using Freeplane software, all of them were clustered and innovation projects were defined. In the services workgroup, 87 and 25 ideas were confirmed in phase 1 and phase 2, respectively. In the education workgroup, 8 new programs in the areas of telemedicine, tele-education and teleconsultation were codified. In the technology workgroup, 101 and 11 ideas were registered in phase 1 and phase 2, respectively. Today, innovation is considered a major infrastructural element of any change or progress. Thus, the successful implementation of a telemedicine project not only needs funding, human resources, and full equipment. It also requires the use of innovation models to cover several different aspects of change and progress. The results of the study can provide a basis for the implementation of future telemedicine projects using new participatory, creative, and innovative models.

  17. Innovation Network Development Model in Telemedicine: A Change in Participation

    PubMed Central

    Goodarzi, Maryam; Safdari, Reza; Dargahi, Hossein; Naeimi, Sara

    2015-01-01

    Objectives This paper introduces a telemedicine innovation network and reports its implementation in Tehran University of Medical Sciences. The required conditions for the development of future projects in the field of telemedicine are also discussed; such projects should be based on the common needs and opportunities in the areas of healthcare, education, and technology. Methods The development of the telemedicine innovation network in Tehran University of Medical Sciences was carried out in two phases: identifying the beneficiaries of telemedicine, and codification of the innovation network memorandum; and brainstorming of three workgroup members, and completion and clustering ideas. The present study employed a qualitative survey by using brain storming method. Thus, the ideas of the innovation network members were gathered, and by using Freeplane software, all of them were clustered and innovation projects were defined. Results In the services workgroup, 87 and 25 ideas were confirmed in phase 1 and phase 2, respectively. In the education workgroup, 8 new programs in the areas of telemedicine, tele-education and teleconsultation were codified. In the technology workgroup, 101 and 11 ideas were registered in phase 1 and phase 2, respectively. Conclusions Today, innovation is considered a major infrastructural element of any change or progress. Thus, the successful implementation of a telemedicine project not only needs funding, human resources, and full equipment. It also requires the use of innovation models to cover several different aspects of change and progress. The results of the study can provide a basis for the implementation of future telemedicine projects using new participatory, creative, and innovative models. PMID:26618033

  18. Using a Multiple Intelligences Assessment To Facilitate Teacher Development.

    ERIC Educational Resources Information Center

    Shearer, C. Branton

    In phase 1 of this study, development and validation studies of a new assessment for the multiple intelligences were conducted. The second phase of the study was a pilot implementation project during a single academic year in collaboration with several public school teachers. Phase 1 involved a series of activities including initial instrument…

  19. Mapping of information and identification of construction waste at project life cycle

    NASA Astrophysics Data System (ADS)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  20. Using Radar, Lidar, and Radiometer measurements to Classify Cloud Type and Study Middle-Level Cloud Properties

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Zhien

    2010-06-29

    The project is mainly focused on the characterization of cloud macrophysical and microphysical properties, especially for mixed-phased clouds and middle level ice clouds by combining radar, lidar, and radiometer measurements available from the ACRF sites. First, an advanced mixed-phase cloud retrieval algorithm will be developed to cover all mixed-phase clouds observed at the ACRF NSA site. The algorithm will be applied to the ACRF NSA observations to generate a long-term arctic mixed-phase cloud product for model validations and arctic mixed-phase cloud processes studies. To improve the representation of arctic mixed-phase clouds in GCMs, an advanced understanding of mixed-phase cloud processesmore » is needed. By combining retrieved mixed-phase cloud microphysical properties with in situ data and large-scale meteorological data, the project aim to better understand the generations of ice crystals in supercooled water clouds, the maintenance mechanisms of the arctic mixed-phase clouds, and their connections with large-scale dynamics. The project will try to develop a new retrieval algorithm to study more complex mixed-phase clouds observed at the ACRF SGP site. Compared with optically thin ice clouds, optically thick middle level ice clouds are less studied because of limited available tools. The project will develop a new two wavelength radar technique for optically thick ice cloud study at SGP site by combining the MMCR with the W-band radar measurements. With this new algorithm, the SGP site will have a better capability to study all ice clouds. Another area of the proposal is to generate long-term cloud type classification product for the multiple ACRF sites. The cloud type classification product will not only facilitates the generation of the integrated cloud product by applying different retrieval algorithms to different types of clouds operationally, but will also support other research to better understand cloud properties and to validate model simulations. The ultimate goal is to improve our cloud classification algorithm into a VAP.« less

  1. Enhanced Night Visibility Series, Volume XII : Overview of Phase II and Development of Phase III Experimental Plan

    DOT National Transportation Integrated Search

    2005-12-01

    This volume provides an overview of the six studies that compose Phase II of the Enhanced Night Visibility project and the experimental plan for its third and final portion, Phase III. The Phase II studies evaluated up to 12 vision enhancement system...

  2. Biomass power for rural development. Technical progress report, October 1--December 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill Power Station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the fourth quarter of 1997 the Consortium submitted a Phase-2 proposal. A few of the other more important milestones are outlined below. The first quarter of 1998 will be dominated by pre-planting activity in the spring.« less

  3. Software engineering standards and practices

    NASA Technical Reports Server (NTRS)

    Durachka, R. W.

    1981-01-01

    Guidelines are presented for the preparation of a software development plan. The various phases of a software development project are discussed throughout its life cycle including a general description of the software engineering standards and practices to be followed during each phase.

  4. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  5. KSC SBIR/STTR 2004 Program Year Report

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The Kennedy Space Center Level III SBIR/STTR management staff is under the Technology Transfer Office within the Spaceport Engineering and Technology Directorate. The SBIR and STTR programs provide an opportunity for small high technology companies and research institutions to participate in Government-sponsored research and development (R&D) programs in key technology areas. The SBIR program was established by Congress in 1982 to provide increased opportunities for small businesses to participate in R&D programs, increase employment, and improve U.S. competitiveness. The program's specific objectives are to stimulate U.S. technological innovation, use small businesses to meet Federal research and development needs, increase private sector commercialization of innovations, and foster and encourage participation by socially disadvantaged businesses. Legislation enacted in December 2000 reauthorized the program and strengthened emphasis on pursuing commercial applications of SBIR projects. An SBIR Phase I contract is the opportunity to establish the feasibility and technical merit of a proposed innovation. Selected competitively, the Phase I contract lasts for 6 months and is funded up to $70,000. SBIR Phase II contracts continue the most promising Phase I projects based on scientific! technical merit, expected value to NASA, company capability, and commercial potential. Phase II contracts are usually for a period of 24 months and may not exceed $600,000. NASA usually selects approximately 40 percent of Phase I projects to continue to the Phase II level. Phase III is the process of furthering the development of a product to make it commercially available. The STTR program awards contracts to small business concerns for cooperative R&D with a nonprofit research institution. Research institutions include nonprofit research organizations, Federal laboratories, or universities. The goal of the program established by Congress is to facilitate the transfer of technology developed by a research institution through the entrepreneurship of a small business. The STIR program is smaller in funding than the SBIR program. While the proposal is submitted by the small business concern, at least 30 percent of the funding and work must originate with the research institution. STTR Phase I projects receive up to $100K for a one-year effort, and a Phase II contract receives up to $600K for two years.

  6. Enhancements to highway construction scheduling expert system.

    DOT National Transportation Integrated Search

    2015-05-01

    This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...

  7. A systematic review of studies evaluating Australian indigenous community development projects: the extent of community participation, their methodological quality and their outcomes.

    PubMed

    Snijder, Mieke; Shakeshaft, Anthony; Wagemakers, Annemarie; Stephens, Anne; Calabria, Bianca

    2015-11-21

    Community development is a health promotion approach identified as having great potential to improve Indigenous health, because of its potential for extensive community participation. There has been no systematic examination of the extent of community participation in community development projects and little analysis of their effectiveness. This systematic review aims to identify the extent of community participation in community development projects implemented in Australian Indigenous communities, critically appraise the qualitative and quantitative methods used in their evaluation, and summarise their outcomes. Ten electronic peer-reviewed databases and two electronic grey literature databases were searched for relevant studies published between 1990 and 2015. The level of community participation and the methodological quality of the qualitative and quantitative components of the studies were assessed against standardised criteria. Thirty one evaluation studies of community development projects were identified. Community participation varied between different phases of project development, generally high during project implementation, but low during the evaluation phase. For the majority of studies, methodological quality was low and the methods were poorly described. Although positive qualitative or quantitative outcomes were reported in all studies, only two studies reported statistically significant outcomes. Partnerships between researchers, community members and service providers have great potential to improve methodological quality and community participation when research skills and community knowledge are integrated to design, implement and evaluate community development projects. The methodological quality of studies evaluating Australian Indigenous community development projects is currently too weak to confidently determine the cost-effectiveness of community development projects in improving the health and wellbeing of Indigenous Australians. Higher quality studies evaluating community development projects would strengthen the evidence base.

  8. Actively triggered 4d cone-beam CT acquisition.

    PubMed

    Fast, Martin F; Wisotzky, Eric; Oelfke, Uwe; Nill, Simeon

    2013-09-01

    4d cone-beam computed tomography (CBCT) scans are usually reconstructed by extracting the motion information from the 2d projections or an external surrogate signal, and binning the individual projections into multiple respiratory phases. In this "after-the-fact" binning approach, however, projections are unevenly distributed over respiratory phases resulting in inefficient utilization of imaging dose. To avoid excess dose in certain respiratory phases, and poor image quality due to a lack of projections in others, the authors have developed a novel 4d CBCT acquisition framework which actively triggers 2d projections based on the forward-predicted position of the tumor. The forward-prediction of the tumor position was independently established using either (i) an electromagnetic (EM) tracking system based on implanted EM-transponders which act as a surrogate for the tumor position, or (ii) an external motion sensor measuring the chest-wall displacement and correlating this external motion to the phase-shifted diaphragm motion derived from the acquired images. In order to avoid EM-induced artifacts in the imaging detector, the authors devised a simple but effective "Faraday" shielding cage. The authors demonstrated the feasibility of their acquisition strategy by scanning an anthropomorphic lung phantom moving on 1d or 2d sinusoidal trajectories. With both tumor position devices, the authors were able to acquire 4d CBCTs free of motion blurring. For scans based on the EM tracking system, reconstruction artifacts stemming from the presence of the EM-array and the EM-transponders were greatly reduced using newly developed correction algorithms. By tuning the imaging frequency independently for each respiratory phase prior to acquisition, it was possible to harmonize the number of projections over respiratory phases. Depending on the breathing period (3.5 or 5 s) and the gantry rotation time (4 or 5 min), between ∼90 and 145 projections were acquired per respiratory phase resulting in a dose of ∼1.7-2.6 mGy per respiratory phase. Further dose savings and decreases in the scanning time are possible by acquiring only a subset of all respiratory phases, for example, peak-exhale and peak-inhale only scans. This study is the first experimental demonstration of a new 4d CBCT acquisition paradigm in which imaging dose is efficiently utilized by actively triggering only those projections that are desired for the reconstruction process.

  9. Design specifications for NALDA (Naval Aviation Logistics Data Analysis) CAI (computer aided instruction): Phase 2, Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitty, A.F.; Handler, B.H.; Duncan, L.D.

    Data Systems Engineering Organization (DSEO) personnel are developing a prototype computer aided instruction (CAI) system for the Naval Aviation Logistics Data Analysis (NALDA) system. The objective of this project is to provide a prototype for implementing CAI as an enhancement to existing NALDA training. The CAI prototype project is being performed in phases. The task undertaken in Phase I was to analyze the problem and the alternative solutions and to develop a set of recommendations on how best to proceed. In Phase II a structured design and specification document was completed that will provide the basis for development and implementationmore » of the desired CAI system. Phase III will consist of designing, developing, and testing a user interface which will extend the features of the Phase II prototype. The design of the CAI prototype has followed a rigorous structured analysis based on Yourdon/DeMarco methodology and Information Engineering tools. This document includes data flow diagrams, a data dictionary, process specifications, an entity-relationship diagram, a curriculum description, special function key definitions, and a set of standards developed for the NALDA CAI Prototype.« less

  10. 77 FR 36994 - Questa Ranger District, Carson National Forest; Taos County, NM; Taos Ski Valley's 2010 Master...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... County, NM; Taos Ski Valley's 2010 Master Development Plan--Phase 1 Projects; Additional Filings AGENCY... environmental impact statement for a proposal to authorize several (Phase 1) projects included in the Taos Ski... (ROD) are expected in July 2012. Change in Responsible Official: In addition, this notice changes the...

  11. GROWING ALTERNATIVE SUSTAINABLE BUILDINGS: BIOCOMPOSITE PRODUCTS FROM NATURAL FIBER, BIODEGRADABLE AND RECYCLABLE POLYMER MATERIALS FOR LOAD-BEARING CONSTRUCTION COMPONENTS

    EPA Science Inventory

    The Phase 2 proposal set out to define a number of limited research objectives to carry the project forward, based on the success of research and design carried out in Phase I through to the development and implementation of the project towards a marketable commodity for th...

  12. Project management in the development of scientific software

    NASA Astrophysics Data System (ADS)

    Platz, Jochen

    1986-08-01

    This contribution is a rough outline of a comprehensive project management model for the development of software for scientific applications. The model was tested in the unique environment of the Siemens AG Corporate Research and Technology Division. Its focal points are the structuring of project content - the so-called phase organization, the project organization and the planning model used, and its particular applicability to innovative projects. The outline focuses largely on actual project management aspects rather than associated software engineering measures.

  13. Feasibility of developing a portable driver performance data acquisition system for human factors research: Technical tasks. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, R.J.; Barickman, F.S.; Spelt, P.F.

    1998-01-01

    A two-phase, multi-year research program entitled ``development of a portable driver performance data acquisition system for human factors research`` was recently completed. The primary objective of the project was to develop a portable data acquisition system for crash avoidance research (DASCAR) that will allow drive performance data to be collected using a large variety of vehicle types and that would be capable of being installed on a given vehicle type within a relatively short-time frame. During phase 1 a feasibility study for designing and fabricating DASCAR was conducted. In phase 2 of the research DASCAR was actually developed and validated.more » This technical memorandum documents the results from the feasibility study. It is subdivided into three volumes. Volume one (this report) addresses the last five items in the phase 1 research and the first issue in the second phase of the project. Volumes two and three present the related appendices, and the design specifications developed for DASCAR respectively. The six tasks were oriented toward: identifying parameters and measures; identifying analysis tools and methods; identifying measurement techniques and state-of-the-art hardware and software; developing design requirements and specifications; determining the cost of one or more copies of the proposed data acquisition system; and designing a development plan and constructing DASCAR. This report also covers: the background to the program; the requirements for the project; micro camera testing; heat load calculations for the DASCAR instrumentation package in automobile trunks; phase 2 of the research; the DASCAR hardware and software delivered to the National Highway Traffic Safety Administration; and crash avoidance problems that can be addressed by DASCAR.« less

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Littlefield, Adriane C.; Munir, Ammar M.; Alnajjar, Abdalla Abdelaziz

    This report describes the findings of the effort initiated by the Arab Science and Technology Foundation and the Cooperative Monitoring Center at Sandia National Laboratories to identify, contact, and engage members of the Iraqi science and technology (S&T) community. The initiative is divided into three phases. The first phase, the survey of the Iraqi scientific community, shed light on the most significant current needs in the fields of science and technology in Iraq. Findings from the first phase will lay the groundwork for the second phase that includes the organization of a workshop to bring international support for the initiative,more » and simultaneously decides on an implementation mechanism. Phase three involves the execution of outcomes of the report as established in the workshop. During Phase 1 the survey team conducted a series of trips to Iraq during which they had contact with nearly 200 scientists from all sections of the country, representing all major Iraqi S&T specialties. As a result of these contacts, the survey team obtained over 450 project ideas from Iraqi researchers. These projects were revised and analyzed to identify priorities and crucial needs. After refinement, the result is approximately 170 project ideas that have been categorized according to their suitability for (1) developing joint research projects with international partners, (2) engaging Iraqi scientists in solving local problems, and (3) developing new business opportunities. They have also been ranked as to high, medium, or low priority.« less

  15. Youths as partners in a community participatory project for substance use prevention.

    PubMed

    Kulbok, Pamela A; Meszaros, Peggy S; Bond, Donna C; Thatcher, Esther; Park, Eunhee; Kimbrell, Monica; Smith-Gregory, Tracey

    2015-01-01

    This community-based participatory research project aimed to develop strategies to prevent youth substance use in a rural county. This article (1) describes the project phases, (2) examines unique contributions and considerations of youth involvement, and (3) explores the youths' perspective. Twelve youths, aged 16 to 18 years, joined parents, community leaders, and research specialists on the community-based participatory research team. The youths were integrally involved in all phases including the community assessment, community leader interviews, selection of a substance use prevention program, and program implementation. Youths reported sustained enthusiasm, experiences of authentic leadership, development of research skills, and greater awareness of their community.

  16. DEVELOPING A COST EFFECTIVE ENVIRONMENTAL SOLUTION FOR PRODUCED WATER AND CREATING A ''NEW'' WATER RESOURCE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glenn Doran

    1997-04-28

    This report summarizes the status of this project for the quarter January 1, 1997 to March 31, 1997. Phase II has been started and Task 7, Develop Pilot Scale Test Work Plan has been completed. The operational portion of this phase, Task 8 has been initiated with several pieces of pilot equipment already on-site. The start up of the full process train will not occur until the next quarter. The project is slightly behind schedule. A no cost extension was requested and was granted. The anticipated completion date is December 31, 1997. The project is on budget.

  17. Transit safety retrofit package development : final report.

    DOT National Transportation Integrated Search

    2014-07-01

    This report provides a summary of the Transit Safety Retrofit Package (TRP) Development project and its results. The report documents results of each project phase, and provides recommended next steps as well as a vision for a next generation TRP. Th...

  18. A Multidisciplinary Approach to Decommissioning Offshore Wells Using Stakeholder Engagement, Risk Identification, and the United Nations Sustainable Development Goals

    NASA Astrophysics Data System (ADS)

    Battalora, L.; Prasad, M.

    2017-12-01

    Context/PurposeThe typical oil and gas project lifecycle includes acquisition, exploration, drilling, production, and decommissioning phases. The oil and gas industry (Industry) has become proactive in identifying and mitigating health, safety, security, environment, and social responsibility risks during these phases as well as designing for sustainable development. With many fields reaching the end stages of the lifecycle, Industry is faced with the challenge of identifying and evaluating risks in the decommissioning phase. The level of challenge is increased when planning for the decommissioning of offshore wells. This paper describes tools that can be applied in the multidisciplinary design of the decommissioning program including use of the United Nations Sustainable Development Goals (SDGs). MethodsStakeholder engagement is key to a successful project. Typical stakeholders in an oil and gas project include the community, regulatory agencies, federal, state, and local governments, private investors, academia, and non-governmental organizations. Before engagement begins, stakeholders must be identified as well as their level of influence in the project. Relationships between stakeholders are "mapped" providing a better understanding of priorities and areas of concentration. Project risks are identified and ranked according to likelihood and impact. Mitigations are matched to risks. Sustainable development is implemented through acknowledgement of societal, economic, and environmental impacts in engineering design. InterpretationRecently, the United Nations Development Programme (UNDP), the International Finance Corporation (IFC) and IPIECA, the global oil and gas industry association for environmental and social issues, partnered to develop the publication, Mapping the oil and gas industry to the Sustainable Development Goals: An Atlas. SDGs have been linked to Industry operations and can serve as a guide for the offshore decommissioning phase ConclusionA multidisciplinary approach using stakeholder engagement and risk identification tools and the United Nations Sustainable Development Goals is recommended for designing the decommissioning program of offshore wells. This recommendation also applies to onshore decommissioning programs.

  19. Caltrans WeatherShare Phase II System: An Application of Systems and Software Engineering Process to Project Development

    DOT National Transportation Integrated Search

    2009-08-25

    In cooperation with the California Department of Transportation, Montana State University's Western Transportation Institute has developed the WeatherShare Phase II system by applying Systems Engineering and Software Engineering processes. The system...

  20. Change management methodologies trained for automotive infotainment projects

    NASA Astrophysics Data System (ADS)

    Prostean, G.; Volker, S.; Hutanu, A.

    2017-01-01

    An Automotive Electronic Control Units (ECU) development project embedded within a car Environment is constantly under attack of a continuous flow of modifications of specifications throughout the life cycle. Root causes for those modifications are for instance simply software or hardware implementation errors or requirement changes to satisfy the forthcoming demands of the market to ensure the later commercial success. It is unavoidable that from the very beginning until the end of the project “requirement changes” will “expose” the agreed objectives defined by contract specifications, which are product features, budget, schedule and quality. The key discussions will focus upon an automotive radio-navigation (infotainment) unit, which challenges aftermarket devises such as smart phones. This competition stresses especially current used automotive development processes, which are fit into a 4 Year car development (introduction) cycle against a one-year update cycle of a smart phone. The research will focus the investigation of possible impacts of changes during all phases of the project: the Concept-Validation, Development and Debugging-Phase. Building a thorough understanding of prospective threats is of paramount importance in order to establish the adequate project management process to handle requirement changes. Personal automotive development experiences and Literature review of change- and configuration management software development methodologies led the authors to new conceptual models, which integrates into the structure of traditional development models used in automotive projects, more concretely of radio-navigation projects.

  1. EXOS research on master controllers for robotic devices

    NASA Technical Reports Server (NTRS)

    Marcus, Beth A.; An, Ben; Eberman, Brian

    1992-01-01

    Two projects are currently being conducted by EXOS under the Small Business Innovation Research (SBIR) program with NASA. One project will develop a force feedback device for controlling robot hands, the other will develop an elbow and shoulder exoskeleton which can be integrated with other EXOS devices to provide whole robot arm and hand control. Aspects covered are the project objectives, important research issues which have arisen during the developments, and interim results of the projects. The Phase 1 projects currently underway will result in hardware prototypes and identification of research issues required for complete system development and/or integration.

  2. Upstream Optioneering: Optimising Higher Activity Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McTeer, Jennifer; Morris, Jenny; Wickham, Stephen

    2013-07-01

    The Upstream Optioneering project was created by the Nuclear Decommissioning Authority (NDA) Radioactive Waste Management Directorate (RWMD) to support the development and implementation of opportunities to optimise the management of UK higher activity waste, spent fuel and other materials that may be disposed of in a geological disposal facility. The project works in an integrative manner with the NDA, RWMD and waste producers, and was split into three phases: - In Phase 1 waste management opportunities were identified and collated from across the NDA estate. - In Phase 2, opportunities collated during Phase 1, were further consolidated, analysed and prioritisedmore » to develop a three year work programme. Prioritisation ensured that resources were deployed appropriately and opportunities can be realised before the potential benefit diminishes. - Phase 3, which began in April 2012, comprises a three year work programme to address the prioritised opportunities. Work varies from direct implementation of opportunities to scoping studies that may pave the way for more detailed subsequent work by Site Licence Companies. The work programme is flexible and, subject to change control, varies depending on the needs of project sponsors (RWMD, NDA Strategy and NDA Delivery). This paper provides an overview of the Upstream Optioneering project (focusing particularly on Phases 2 and 3), summarises work carried out to date within the three year work programme, and provides some examples of the main findings concerning specific opportunities from Year One of the Phase 3 work programme. (authors)« less

  3. DEVELOPING A LANDSCAPE APPROACH TO EVALUATION OF WETLAND CONDITION IN THE SOUTHERN ROCKY MOUNTAINS: PHASE II.

    EPA Science Inventory

    This proposal details a project whose goal is to develop a rapid assessment tool for determining the success of compensatory wetland mitigation within a hydrogeomorphic framework. Phase I of this program, currently in progress and funded through FY 2000 RARE funds, is developing...

  4. Survival Skills. Pre-Apprenticeship Phase 2 Training. Instructors Guide

    ERIC Educational Resources Information Center

    Lane Community Coll., Eugene, OR.

    This instructor's guide contains the 43 Survival Skills modules developed for Pre-Apprenticeship Phase 2 Training. Introductory materials include a description of components of the pre-apprenticeship project, recommendations for module implementation, and synopses of the modules that were developed to prompt social skills development. Each module…

  5. Development of wave and surge atlas for the design and protection of coastal bridges in South Louisiana - phase 2.

    DOT National Transportation Integrated Search

    2016-09-01

    This report summarizes the work performed by INTERA Incorporated (INTERA), for the Louisiana Department of Transportation and Development (DOTD) on Phase 2 of LTRC project No. 10-4ST, Development of Wave and Surge Atlas for the Design Protection o...

  6. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BEVINS, R.R.

    This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operationsmore » input or engineering judgment.« less

  7. UAS C2 Radio System - Final Phase 1 Development and Testing

    NASA Technical Reports Server (NTRS)

    Kerczewski, Robert; Shalkhauser, Kurt

    2017-01-01

    Phase 1 of the Command and Control Communications (C2) Subproject of NASA's UAS Integration in the National Airspace System Project included the development and testing of prototype C2 radio systems. This information paper provides an overview of the functionality and testing of the fifth and final Phase 1 generation of the prototype radio system.

  8. The planning cycle.

    PubMed

    Johnson, William

    2005-01-01

    Information technology planning can be described as a continuous cyclical process composed of three phases whose primary purpose is optimum allocation of scarce resources. In the assessment phase, planners assess user needs, environmental factors, business objectives, and IT infrastructure needs to develop IT projects that address needs in each of these areas. A major goal of this phase is to develop a broad IT inventory. The prioritization phase seeks to ensure optimum allocation of scarce resources by prioritizing ITprojects based on: Costs--total life cycle costs. Benefits--both quantitative and non-quantitative, including support for the organization's strategic business objectives. Risks--subjective assessments of technological and non-technological risks. Implementation requirements--time and personnel requirements to implement the system. The scheduling phase incorporates sequencing considerations, personnel availability, and budgetary constraints to produce an IT plan in which project priorities are adjusted to meet organizational realities.

  9. 76 FR 42122 - Ocean Renewable Power Company, LLC; Notice Concluding Pre-Filing Process and Approving Process...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12711-003] Ocean Renewable.... e. Name of Project: Cobscook Bay Tidal Energy Project. f. Location: In Cobscook Bay, in Washington... a two-phased development approach for the Cobscook Bay Tidal Energy Project. The project would...

  10. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... phase activities. The Secretary shall provide the Indian tribe or tribal organization with an opportunity to review the project construction documents at the concept phase, the schematic phase, the design development phase, and the final construction documents phase, or as otherwise negotiated. Upon receipt of...

  11. Congestion-Responsive On-Ramp Metering : Before and After Studies - Phase 1

    DOT National Transportation Integrated Search

    2016-07-06

    The objective of this project was to develop recommendations toward a statewide policy of congestion responsive freeway ramp metering operation. The research is performed in two phases. In phase 1, alternative ramp metering activation strategies were...

  12. Validation of the Competencies Needed by Vocational Education Teachers, Middle Managers, and Administrators. Phase II of a Professional Development Study for Massachusetts, Volume I.

    ERIC Educational Resources Information Center

    Boston Univ., MA. School of Education.

    This is the first of four volumes reporting phase 2 of a two-phase project to examine the competency-based vocational teacher education movement and analyze the current state of the art (phase 1), and to assess the implications for preservice, inservice, and leadership level professional development programs in career and occupational education in…

  13. Phase 2 environmental site investigation procedures and technologies for property transfer and PS and E development

    DOT National Transportation Integrated Search

    1999-05-01

    The purpose of this project is to provide TxDOT with an improved procedure for conducting environmental site investigations at various stages during transportation infrastructure development. The project seeks to identify modern assessment technologi...

  14. The Art of Science

    NASA Astrophysics Data System (ADS)

    Vaidya, Ashwin; Munakata, Mika

    2014-03-01

    The Art of Science project at Montclair State University strives to communicate the creativity inherent in the sciences to students and the general public alike. The project uses connections between the arts and sciences to show the underlying unity and interdependence of the two. The project is planned as one big `performance' bringing together the two disciplines around the theme of sustainability. In the first phase, physics students learned about and built human-powered generators including hand cranks and bicycle units. In the second phase, using the generators to power video cameras, art students worked with a visiting artist to make short films on the subject of sustainability, science, and art. The generators and films were showcased at an annual university Physics and Art exhibition which was open to the university and local community. In the final phase, to be conducted, K12 teachers will learn about the project through a professional development workshop and will be encouraged to adapt the experiment for their own classrooms. The last phase will also combine the university and K12 projects for an exhibition to be displayed on Earth Day, 2014. Project funded by the APS Outreach Grant.

  15. Project 8, Phase III Design: Placing an eV-Scale Limit on the Neutrino Mass using Cyclotron Radiation Emission Spectroscopy

    NASA Astrophysics Data System (ADS)

    Oblath, Noah; Project 8 Collaboration

    2016-09-01

    We report on the design concept for Phase III of the Project 8 experiment. In the third phase of Project 8 we aim to place a limit on the neutrino mass that is similar to the current limits set by tritium beta-decay experiments, mν < 2eV . From the first two phases of Project 8 we move to a novel design consisting of a 100cm3 cylindrical volume of tritium gas instrumented with two 30-element rings of inward-facing antennas. Beam-forming techniques similar to those used in radioastronomy will be employed to search for and track electron signals in the fiducial volume. This talk will present the quantitative design concept for the phased-array receiver, and illustrate how we are progressing towards the Phase IV experiment, which will have sensitivity to the neutrino mass scale allowed by the inverted mass hierarchy. This work is supported by the DOE Office of Science Early Career Research Program, and the Laboratory Directed Research and Development Program at Pacific Northwest National Laboratory.

  16. Status and Significance of Credentialing.

    ERIC Educational Resources Information Center

    Musgrave, Dorothea

    1984-01-01

    Discusses the current status, significance, and future of credentialing in the field of environmental health. Also discusses four phases of a Bureau of Health Professions (BHP) Credentialing Program and BHP-funded projects related to their development and implementation. Phases include role delineation, resources development, examination…

  17. An Overview of 2014 SBIR Phase 1 and Phase 2 Communications Technology and Development

    NASA Technical Reports Server (NTRS)

    Nguyen, Hung D.; Steele, Gynelle C.; Morris, Jessica R.

    2015-01-01

    NASA's Small Business Innovation Research (SBIR) program focuses on technological innovation by investing in development of innovative concepts and technologies to help NASA mission directorates address critical research needs for Agency programs. This report highlights eight of the innovative SBIR 2014 Phase I and Phase II projects that emphasize one of NASA Glenn Research Center's six core competencies-Communication Technology and Development. The technologies cover a wide spectrum of applications such as X-ray navigation, microsensor instrument for unmanned aerial vehicle airborne atmospheric measurements, 16-element graphene-based phased array antenna system, interferometric star tracker, ultralow power fast-response sensor, and integrated spacecraft navigation and communication. Each featured technology describes an innovation, technical objective, and highlights NASA commercial and industrial applications. This report provides an opportunity for NASA engineers, researchers, and program managers to learn how NASA SBIR technologies could help their programs and projects, and lead to collaborations and partnerships between the small SBIR companies and NASA that would benefit both.

  18. Fleet Evaluation and Factory Installation of Aerodynamic Heavy Duty Truck Trailers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck, Jason; Salari, Kambiz; Ortega, Jason

    2013-09-30

    The purpose of DE-EE0001552 was to develop and deploy a combination of trailer aerodynamic devices and low rolling resistance tires that reduce fuel consumption of a class 8 heavy duty tractor-trailer combination vehicle by 15%. There were 3 phases of the project: Phase 1 – Perform SAE Typed 2 track tests with multiple device combinations. Phase 2 – Conduct a fleet evaluation with selected device combination. Phase 3 – Develop the devices required to manufacture the aerodynamic trailer. All 3 phases have been completed. There is an abundance of available trailer devices on the market, and fleets and owner operatorsmore » have awareness of them and are purchasing them. The products developed in conjunction with this project are at least in their second round of refinement. The fleet test undertaken showed an improvement of 5.5 – 7.8% fuel economy with the devices (This does not include tire contribution).« less

  19. Space station MSFC-DPD-235/DR no. MA-05 phase C/D program development plan. Volume 2: Phase C/D, programmatic requirements

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.

  20. SU-E-J-26: A Novel Technique for Markerless Self-Sorted 4D-CBCT Using Patient Motion Modeling: A Feasibility Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, L; Zhang, Y; Harris, W

    2015-06-15

    Purpose: To develop an automatic markerless 4D-CBCT projection sorting technique by using a patient respiratory motion model extracted from the planning 4D-CT images. Methods: Each phase of onboard 4D-CBCT is considered as a deformation of one phase of the prior planning 4D-CT. The deformation field map (DFM) is represented as a linear combination of three major deformation patterns extracted from the planning 4D-CT using principle component analysis (PCA). The coefficients of the PCA deformation patterns are solved by matching the digitally reconstructed radiograph (DRR) of the deformed volume to the onboard projection acquired. The PCA coefficients are solved for eachmore » single projection, and are used for phase sorting. Projections at the peaks of the Z direction coefficient are sorted as phase 1 and other projections are assigned into 10 phase bins by dividing phases equally between peaks. The 4D digital extended-cardiac-torso (XCAT) phantom was used to evaluate the proposed technique. Three scenarios were simulated, with different tumor motion amplitude (3cm to 2cm), tumor spatial shift (8mm SI), and tumor body motion phase shift (2 phases) from prior to on-board images. Projections were simulated over 180 degree scan-angle for the 4D-XCAT. The percentage of accurately binned projections across entire dataset was calculated to represent the phase sorting accuracy. Results: With a changed tumor motion amplitude from 3cm to 2cm, markerless phase sorting accuracy was 100%. With a tumor phase shift of 2 phases w.r.t. body motion, the phase sorting accuracy was 100%. With a tumor spatial shift of 8mm in SI direction, phase sorting accuracy was 86.1%. Conclusion: The XCAT phantom simulation results demonstrated that it is feasible to use prior knowledge and motion modeling technique to achieve markerless 4D-CBCT phase sorting. National Institutes of Health Grant No. R01-CA184173 Varian Medical System.« less

  1. Systems Engineering in NASA's R&TD Programs

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    Systems engineering is largely the analysis and planning that support the design, development, and operation of systems. The most common application of systems engineering is in guiding systems development projects that use a phased process of requirements, specifications, design, and development. This paper investigates how systems engineering techniques should be applied in research and technology development programs for advanced space systems. These programs should include anticipatory engineering of future space flight systems and a project portfolio selection process, as well as systems engineering for multiple development projects.

  2. SU-F-I-11: Software Development for 4D-CBCT Research of Real-Time-Image Gated Spot Scanning Proton Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fujii, T; Fujii, Y; Shimizu, S

    Purpose: To acquire correct information for inside the body in patient positioning of Real-time-image Gated spot scanning Proton Therapy (RGPT), utilization of tomographic image at exhale phase of patient respiration obtained from 4-dimensional Cone beam CT (4D-CBCT) has been desired. We developed software named “Image Analysis Platform” for 4D-CBCT researches which has technique to segment projection-images based on 3D marker position in the body. The 3D marker position can be obtained by using two axes CBCT system at Hokkaido University Hospital Proton Therapy Center. Performance verification of the software was implemented. Methods: The software calculates 3D marker position retrospectively bymore » using matching positions on pair projection-images obtained by two axes fluoroscopy mode of CBCT system. Log data of 3D marker tracking are outputted after the tracking. By linking the Log data and gantry-angle file of projection-image, all projection-images are equally segmented to spatial five-phases according to marker 3D position of SI direction and saved to specified phase folder. Segmented projection-images are used for CBCT reconstruction of each phase. As performance verification of the software, test of segmented projection-images was implemented for sample CT phantom (Catphan) image acquired by two axes fluoroscopy mode of CBCT. Dummy marker was added on the images. Motion of the marker was modeled to move in 3D space. Motion type of marker is sin4 wave function has amplitude 10.0 mm/5.0 mm/0 mm, cycle 4 s/4 s/0 s for SI/AP/RL direction. Results: The marker was tracked within 0.58 mm accuracy in 3D for all images, and it was confirmed that all projection-images were segmented and saved to each phase folder correctly. Conclusion: We developed software for 4D-CBCT research which can segment projection-image based on 3D marker position. It will be helpful to create high quality of 4D-CBCT reconstruction image for RGPT.« less

  3. Military housing foam application and analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torres, J. J.

    2012-03-01

    Sandia and Forest City have established a Cooperative Research and Development Agreement (CRADA), the partnership provides a unique opportunity to take technology research and development from demonstration to application in sustainable communities. This project consists of two activities conducted in Hawaii that focus on performance, integration and application of energy saving technologies. Hawaii has many energy challenges, making this location an excellent testbed for these activities. Under this project, spray foam technology was applied at military housing on Oahu and the consumption data collected. A cost benefit and operational analysis of the foam was completed. The second phase of thismore » project included design, integration, and analysis of photovoltaic systems at a military community on Oahu. This phase of the project was conducted as part of Forest City's second Solar America Showcase Award.« less

  4. Multifunctional Yarns and Fabrics for Energy Applications (NBIT Phase 2)

    DTIC Science & Technology

    2013-05-29

    project focus on developing biscrolled carbon nanotube yarns and textiles for supercapacitor /battery and fuel cell electrode applications was chosen...redox supercapacitors resulted from program work. While project focus was on fuel cell and energy storage electrodes based on biscrolled yarns...project focus on developing biscrolled carbon nanotube yarns and textiles for supercapacitor /battery and fuel cell electrode applications was chosen

  5. An Overview of SBIR Phase 2 Communications Technology and Development

    NASA Technical Reports Server (NTRS)

    Nguyen, Hung D.; Steele, Gynelle C.

    2015-01-01

    Technological innovation is the overall focus of NASA's Small Business Innovation Research (SBIR) program. The program invests in the development of innovative concepts and technologies to help NASA's mission directorates address critical research and development needs for agency projects. This report highlights innovative SBIR Phase II projects from 2007-2012 specifically addressing areas in Communications Technology and Development which is one of six core competencies at NASA Glenn Research Center. There are eighteen technologies featured with emphasis on a wide spectrum of applications such as with a security-enhanced autonomous network management, secure communications using on-demand single photons, cognitive software-defined radio, spacesuit audio systems, multiband photonic phased-array antenna, and much more. Each article in this booklet describes an innovation, technical objective, and highlights NASA commercial and industrial applications. This report serves as an opportunity for NASA personnel including engineers, researchers, and program managers to learn of NASA SBIR's capabilities that might be crosscutting into this technology area. As the result, it would cause collaborations and partnerships between the small companies and NASA Programs and Projects resulting in benefit to both SBIR companies and NASA.

  6. DEVELOPMENT OF NEW DRILLING FLUIDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David B. Burnett

    2003-08-01

    The goal of the project has been to develop new types of drill-in fluids (DIFs) and completion fluids (CFs) for use in natural gas reservoirs. Phase 1 of the project was a 24-month study to develop the concept of advanced type of fluids usable in well completions. Phase 1 tested this concept and created a kinetic mathematical model to accurately track the fluid's behavior under downhole conditions. Phase 2 includes tests of the new materials and practices. Work includes the preparation of new materials and the deployment of the new fluids and new practices to the field. The project addressesmore » the special problem of formation damage issues related to the use of CFs and DIFs in open hole horizontal well completions. The concept of a ''removable filtercake'' has, as its basis, a mechanism to initiate or trigger the removal process. Our approach to developing such a mechanism is to identify the components of the filtercake and measure the change in the characteristics of these components when certain cleanup (filtercake removal) techniques are employed.« less

  7. A Fire Safety Certification System for Board and Care Operators and Staff. SBIR Phase II: Final Report.

    ERIC Educational Resources Information Center

    Walker, Bonnie L.

    This report describes Phase II of a project which developed a system for delivering fire safety training to board and care providers who serve adults with developmental disabilities. Phase II focused on developing and pilot testing a "train the trainers" workshop for instructors and field testing the provider's workshop. Evaluation of…

  8. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerrigan, Philip

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  9. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  10. VTAE Equity Staff Development Workshops and Services--Phase II. Final Report.

    ERIC Educational Resources Information Center

    Baldus, Lorayne; Nelson, Orville

    The Phase II Equity Staff Development project was revised in response to a need to develop an equity strategic planning model with a vision statement, goals, and objectives. The Equity Strategic Planning Model was presented to administrators of Wisconsin Vocational, Technical, and Adult Education (VTAE) colleges for their use in district strategic…

  11. The Chancellor's Model School Project (CMSP)

    NASA Technical Reports Server (NTRS)

    Lopez, Gil

    1999-01-01

    What does it take to create and implement a 7th to 8th grade middle school program where the great majority of students achieve at high academic levels regardless of their previous elementary school backgrounds? This was the major question that guided the research and development of a 7-year long project effort entitled the Chancellor's Model School Project (CMSP) from September 1991 to August 1998. The CMSP effort conducted largely in two New York City public schools was aimed at creating and testing a prototype 7th and 8th grade model program that was organized and test-implemented in two distinct project phases: Phase I of the CMSP effort was conducted from 1991 to 1995 as a 7th to 8th grade extension of an existing K-6 elementary school, and Phase II was conducted from 1995 to 1998 as a 7th to 8th grade middle school program that became an integral part of a newly established 7-12th grade high school. In Phase I, the CMSP demonstrated that with a highly structured curriculum coupled with strong academic support and increased learning time, students participating in the CMSP were able to develop a strong foundation for rigorous high school coursework within the space of 2 years (at the 7th and 8th grades). Mathematics and Reading test score data during Phase I of the project, clearly indicated that significant academic gains were obtained by almost all students -- at both the high and low ends of the spectrum -- regardless of their previous academic performance in the K-6 elementary school experience. The CMSP effort expanded in Phase II to include a fully operating 7-12 high school model. Achievement gains at the 7th and 8th grade levels in Phase II were tempered by the fact that incoming 7th grade students' academic background at the CMSP High School was significantly lower than students participating in Phase 1. Student performance in Phase II was also affected by the broadening of the CMSP effort from a 7-8th grade program to a fully functioning 7-12 high school which as a consequence lessened the focus and structure available to the 7-8th grade students and teachers -- as compared to Phase I. Nevertheless, the CMSP does represent a unique curriculum model for 7th and 8th grade students in urban middle schools. Experience in both Phase I and Phase II of the project allowed the CMSP to be developed and tested along the broad range of parameters and characteristics that embody an operating public school in an urban environment.

  12. Development of High-Fill-Factor Large-Aperture Micromirrors for Agile Optical Phased Arrays

    DTIC Science & Technology

    2010-02-28

    Final Project Report Contract/Grant Title: Development of High-Fill-Factor Large-Aperture Micromirrors for Agile Optical Phased Arrays...factor (HFF) micromirror array (MMA) has been proposed, fabricated and tested. Optical-phased-array (OPA) beam steering based on the HFF MMA has also...electrically tuned to multiple 2. 1. Background High-fill-factor (HFF) micromirror arrays (MMAs) can form optical phased arrays (OPAs) for laser beam

  13. Phase retrieval with the reverse projection method in the presence of object's scattering

    NASA Astrophysics Data System (ADS)

    Wang, Zhili; Gao, Kun; Wang, Dajiang

    2017-08-01

    X-ray grating interferometry can provide substantially increased contrast over traditional attenuation-based techniques in biomedical applications, and therefore novel and complementary information. Recently, special attention has been paid to quantitative phase retrieval in X-ray grating interferometry, which is mandatory to perform phase tomography, to achieve material identification, etc. An innovative approach, dubbed ;Reverse Projection; (RP), has been developed for quantitative phase retrieval. The RP method abandons grating scanning completely, and is thus advantageous in terms of higher efficiency and reduced radiation damage. Therefore, it is expected that this novel method would find its potential in preclinical and clinical implementations. Strictly speaking, the reverse projection method is applicable for objects exhibiting only absorption and refraction. In this contribution, we discuss the phase retrieval with the reverse projection method for general objects with absorption, refraction and scattering simultaneously. Especially, we investigate the influence of the object's scattering on the retrieved refraction signal. Both theoretical analysis and numerical experiments are performed. The results show that the retrieved refraction signal is the product of object's refraction and scattering signals for small values. In the case of a strong scattering, the reverse projection method cannot provide reliable phase retrieval. Those presented results will guide the use of the reverse projection method for future practical applications, and help to explain some possible artifacts in the retrieved images and/or reconstructed slices.

  14. Cascaded Microinverter PV System for Reduced Cost

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bellus, Daniel R.; Ely, Jeffrey A.

    2013-04-29

    In this project, a team led by Delphi will develop and demonstrate a novel cascaded photovoltaic (PV) inverter architecture using advanced components. This approach will reduce the cost and improve the performance of medium and large-sized PV systems. The overall project objective is to develop, build, and test a modular 11-level cascaded three-phase inverter building block for photovoltaic applications and to develop and analyze the associated commercialization plan. The system will be designed to utilize photovoltaic panels and will supply power to the electric grid at 208 VAC, 60 Hz 3-phase. With the proposed topology, three inverters, each with anmore » embedded controller, will monitor and control each of the cascade sections, reducing costs associated with extra control boards. This report details the final disposition on this project.« less

  15. Understanding residential location choices for climate change and transportation decision making : phase 2 report.

    DOT National Transportation Integrated Search

    2015-02-01

    This research builds on the related Phase 1 project. In this second phase, we continue to : study neighborhood and housing preferences that shape the residential location decision process. An : online experimental survey tool is developed to investig...

  16. Countermeasure Evaluation and Validation Project (CEVP) Database Requirement Documentation

    NASA Technical Reports Server (NTRS)

    Shin, Sung Y.

    2003-01-01

    The initial focus of the project by the JSC laboratories will be to develop, test and implement a standardized complement of integrated physiological test (Integrated Testing Regimen, ITR) that will examine both system and intersystem function, and will be used to validate and certify candidate countermeasures. The ITR will consist of medical requirements (MRs) and non-MR core ITR tests, and countermeasure-specific testing. Non-MR and countermeasure-specific test data will be archived in a database specific to the CEVP. Development of a CEVP Database will be critical to documenting the progress of candidate countermeasures. The goal of this work is a fully functional software system that will integrate computer-based data collection and storage with secure, efficient, and practical distribution of that data over the Internet. This system will provide the foundation of a new level of interagency and international cooperation for scientific experimentation and research, providing intramural, international, and extramural collaboration through management and distribution of the CEVP data. The research performed this summer includes the first phase of the project. The first phase of the project is a requirements analysis. This analysis will identify the expected behavior of the system under normal conditions and abnormal conditions; that could affect the system's ability to produce this behavior; and the internal features in the system needed to reduce the risk of unexpected or unwanted behaviors. The second phase of this project have also performed in this summer. The second phase of project is the design of data entry screen and data retrieval screen for a working model of the Ground Data Database. The final report provided the requirements for the CEVP system in a variety of ways, so that both the development team and JSC technical management have a thorough understanding of how the system is expected to behave.

  17. Implementation and Re nement of a Comprehensive Model for Dense Granular Flows

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sundaresan, Sankaran

    2015-09-30

    Dense granular ows are ubiquitous in both natural and industrial processes. They manifest three di erent ow regimes, each exhibiting its own dependence on solids volume fraction, shear rate, and particle-level properties. This research project sought to develop continuum rheological models for dense granular ows that bridges multiple regimes of ow, implement them in open-source platforms for gas-particle ows and perform test simulations. The rst phase of the research covered in this project involved implementation of a steady- shear rheological model that bridges quasi-static, intermediate and inertial regimes of ow into MFIX (Multiphase Flow with Interphase eXchanges - a generalmore » purpose computer code developed at the National Energy Technology Laboratory). MFIX simulations of dense granular ows in hourglass-shaped hopper were then performed as test examples. The second phase focused on formulation of a modi ed kinetic theory for frictional particles that can be used over a wider range of particle volume fractions and also apply for dynamic, multi- dimensional ow conditions. To guide this work, simulations of simple shear ows of identical mono-disperse spheres were also performed using the discrete element method. The third phase of this project sought to develop and implement a more rigorous treatment of boundary e ects. Towards this end, simulations of simple shear ows of identical mono-disperse spheres con ned between parallel plates were performed and analyzed to formulate compact wall boundary conditions that can be used for dense frictional ows at at frictional boundaries. The fourth phase explored the role of modest levels of cohesive interactions between particles on the dense phase rheology. The nal phase of this project focused on implementation and testing of the modi ed kinetic theory in MFIX and running bin-discharge simulations as test examples.« less

  18. Project H - A Complete Spaceport Hydrogen Solution

    NASA Technical Reports Server (NTRS)

    Notardonato, William

    2011-01-01

    This slide presentation reviews Project H, and its importance in the development of Kennedy Space Center (KSC) as a Spaceport capable of multiple launches. It is known that current KSC cryogenic technology results in only approximately 55 % of purchased hydrogen being used. The rest is lost at various points in the process: transfer from transporting vehicle to tank, storage tank boil off, and from the tank to the intended propulsion tanks. Project H's goals would be to have local hydrogen production and liquifaction capability, and to increase the efficiency of hydrogen operations to greater than 80 %. The project envisions two phases: Phase 1 will build a smaller scale demonstration system, and phase 2 will build a full scale spaceport system. This initial project has proposed ideas for local hydrogen production, gaseous distribution, integrated refrigeration and storage, and high efficiency transfer lines that merit further investigation.

  19. Development of Production-Intent Plug-In Hybrid Vehicle Using Advanced Lithium-Ion Battery Packs with Deployment to a Demonstration Fleet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    No, author

    2013-09-29

    The primary goal of this project was to speed the development of one of the first commercially available, OEM-produced plug-in hybrid electric vehicles (PHEV). The performance of the PHEV was expected to double the fuel economy of the conventional hybrid version. This vehicle program incorporated a number of advanced technologies, including advanced lithium-ion battery packs and an E85-capable flex-fuel engine. The project developed, fully integrated, and validated plug-in specific systems and controls by using GM’s Global Vehicle Development Process (GVDP) for production vehicles. Engineering Development related activities included the build of mule vehicles and integration vehicles for Phases I &more » II of the project. Performance data for these vehicles was shared with the U.S. Department of Energy (DOE). The deployment of many of these vehicles was restricted to internal use at GM sites or restricted to assigned GM drivers. Phase III of the project captured the first half or Alpha phase of the Engineering tasks for the development of a new thermal management design for a second generation battery module. The project spanned five years. It included six on-site technical reviews with representatives from the DOE. One unique aspect of the GM/DOE collaborative project was the involvement of the DOE throughout the OEM vehicle development process. The DOE gained an understanding of how an OEM develops vehicle efficiency and FE performance, while balancing many other vehicle performance attributes to provide customers well balanced and fuel efficient vehicles that are exciting to drive. Many vehicle content and performance trade-offs were encountered throughout the vehicle development process to achieve product cost and performance targets for both the OEM and end customer. The project team completed two sets of PHEV development vehicles with fully integrated PHEV systems. Over 50 development vehicles were built and operated for over 180,000 development miles. The team also completed four GM engineering development Buy-Off rides/milestones. The project included numerous engineering vehicle and systems development trips including extreme hot, cold and altitude exposure. The final fuel economy performance demonstrated met the objectives of the PHEV collaborative GM/DOE project. Charge depletion fuel economy of twice that of the non-PHEV model was demonstrated. The project team also designed, developed and tested a high voltage battery module concept that appears to be feasible from a manufacturability, cost and performance standpoint. The project provided important product development and knowledge as well as technological learnings and advancements that include multiple U.S. patent applications.« less

  20. Educating Academic Staff to Reorient Curricula in ESD

    ERIC Educational Resources Information Center

    Biasutti, Michele; Makrakis, Vassilios; Concina, Eleonora; Frate, Sara

    2018-01-01

    Purpose: The purpose of this paper is to present a professional development experience for higher education academic staff within the framework of an international Tempus project focused on reorienting university curricula to address sustainability. The project included revising curricula to phase sustainable development principles into university…

  1. Self-monitoring and psychoeducation in bipolar patients with a smart-phone application (SIMPLe) project: design, development and studies protocols.

    PubMed

    Hidalgo-Mazzei, Diego; Mateu, Ainoa; Reinares, María; Undurraga, Juan; Bonnín, Caterina del Mar; Sánchez-Moreno, José; Vieta, Eduard; Colom, Francesc

    2015-03-20

    New technologies have recently been used for monitoring signs and symptoms of mental health illnesses and particularly have been tested to improve the outcomes in bipolar disorders. Web-based psychoeducational programs for bipolar disorders have also been implemented, yet to our knowledge, none of them have integrated both approaches in one single intervention. The aim of this project is to develop and validate a smartphone application to monitor symptoms and signs and empower the self-management of bipolar disorder, offering customized embedded psychoeducation contents, in order to identify early symptoms and prevent relapses and hospitalizations. The project will be carried out in three complementary phases, which will include a feasibility study (first phase), a qualitative study (second phase) and a randomized controlled trial (third phase) comparing the smartphone application (SIMPLe) on top of treatment as usual with treatment as usual alone. During the first phase, feasibility and satisfaction will be assessed with the application usage log data and with an electronic survey. Focus groups will be conducted and technical improvements will be incorporated at the second phase. Finally, at the third phase, survival analysis with multivariate data analysis will be performed and relationships between socio-demographic, clinical variables and assessments scores with relapses in each group will be explored. This project could result in a highly available, user-friendly and not costly monitoring and psychoeducational intervention that could improve the outcome of people suffering from bipolar disorders in a practical and secure way. Clinical Trials.gov: NCT02258711 (October 2014).

  2. Design of Training Systems, Phase II Report, Volume III; Model Program Descriptions and Operating Procedures. TAEG Report No. 12-2.

    ERIC Educational Resources Information Center

    Naval Training Equipment Center, Orlando, FL. Training Analysis and Evaluation Group.

    The Design of Training Systems (DOTS) project was initiated by the Department of Defense (DOD) to develop tools for the effective management of military training organizations. Volume 3 contains the model and data base program descriptions and operating procedures designed for phase 2 of the project. Flow charts and program listings for the…

  3. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project, UAS Control and Non-Payload Communication System Phase-1 Flight Test Results

    NASA Technical Reports Server (NTRS)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the prototype radio development, and results from phase 1 flight tests conducted during 2013.

  4. Controlled Ecological Life Support System Breadboard Project - 1988

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  5. Evidence-based practice for pain identification in cognitively impaired nursing home residents.

    PubMed

    Sacoco, Christina; Ishikawa, Sally

    2014-09-01

    Pain identification of cognitively impaired elderly is very challenging. This project aimed to identify best practices for pain assessment in nursing home residents with cognitive impairment and to establish a standardized pain assessment guide to optimize nursing practice and resident outcomes. The Iowa Model of Evidence-Based Practice to Promote Quality of Care guided the project's process. Phase I of the project analyzed data gained from chart reviews on current practices of pain assessment, and Phase II used the results of Phase I to develop, implement, and evaluate an evidence-based practice standard for nursing assessment of pain for cognitively impaired residents. Copyright © 2014 Elsevier Inc. All rights reserved.

  6. Development and Validation of the Role Profile of the Nurse Continence Specialist: A Project of the International Continence Society.

    PubMed

    Paterson, Janice; Ostaszkiewicz, Joan; Suyasa, I Gede Putu Darma; Skelly, Jennifer; Bellefeuille, Lesley

    Although nurses have specialized in the management of incontinence, bladder, bowel, and pelvic floor dysfunction for more than 30 years, there is a lack of awareness and underutilization of their role. This article describes a 6-year project to define, characterize, and validate a role profile of the Nurse Continence Specialist. Data collection used a 2-phase, mixed-methods design. Phase 1 of the project resulted in a draft Nurse Continence Specialist role profile and Phase 2 led to validation of the draft profile. The result was a broad consensus about what constitutes the specific skill set for Nurse Continence Specialist specialization within nursing.

  7. A Manhattan Project in Educational Technology, Part II.

    ERIC Educational Resources Information Center

    Roberts, Wesley K.

    The initial four phases of the Training Extension Course (TEC), a project to remedy deficiencies in training programs for armed forces recruits, employed systematic instructional development and extensive audiovisual resources. The project required subcontracting for lesson production and modifications in personnel and budgeting. Posttest evidence…

  8. ITS evaluation -- phase 3 (2010)

    DOT National Transportation Integrated Search

    2011-05-01

    This report documents the results of applying a previously developed, standardized approach for : evaluating intelligent transportation systems (ITS) projects to 17 ITS earmark projects. The evaluation : approach was based on a questionnaire to inves...

  9. ASR-9 processor augmentation card (9-PAC) phase II scan-scan correlator algorithms

    DOT National Transportation Integrated Search

    2001-04-26

    The report documents the scan-scan correlator (tracker) algorithm developed for Phase II of the ASR-9 Processor Augmentation Card (9-PAC) project. The improved correlation and tracking algorithms in 9-PAC Phase II decrease the incidence of false-alar...

  10. Decommissioning of the Iraq former nuclear complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abbas, Mohammed; Helou, Tuama; Ahmead, Bushra

    2007-07-01

    Available in abstract form only. Full text of publication follows: A number of sites in Iraq have some degree of radiological contamination and require decommissioning and remediation in order to ensure radiological safety. Many of these sites in Iraq are located at the nuclear research centre at Al Tuwaitha. The International Atomic Energy Agency (IAEA) Board of Governors has approved a project to assist the Government of Iraq in the evaluation and decommissioning of former facilities that used radioactive materials. The project is divided into three phases: Phase 1: collect and analyze all available data and conduct training of themore » Iraqi staff, Phase 2: develop a decommissioning and remediation plan, and Phase 3: implement field activities relating to decommissioning, remediation and site selection suitable for final disposal of waste. Four working groups have been established to complete the Phase 1 work and significant progress has been made in drafting a new nuclear law which will provide the legal basis for the licensing of the decommissioning of the former nuclear complex. Work is also underway to collect and analysis existing date, to prioritize future activities and to develop a waste management strategy. This will be a long-term and costly project. (authors)« less

  11. School-to-Work Project. Final Report.

    ERIC Educational Resources Information Center

    National Advisory Council on Vocational Education, Washington, DC.

    The document reviews the School-to-Work Project, which has been concerned with improving and developing the school component of the job placement process. Research, design, development, and dissemination phases and results are traced from 1972-1976 through the following stages: (1) Research, 1972-74, involving a literature search to identify…

  12. Critical Language Awareness in the Teaching of Portuguese.

    ERIC Educational Resources Information Center

    Leal, Maria Christina Diniz

    1998-01-01

    Reports a two-phase project aimed at developing critical language awareness through the teaching of Portuguese. During the first phase, 13-year-olds in a Brazilian state school evaluated their Portuguese lessons, and identified features they felt needed altering to develop critical awareness of language and social reality. Changes were proposed…

  13. The Development of a Vocational Diagnostic Program. Interim Report.

    ERIC Educational Resources Information Center

    Barnard, William W.

    A five-phased project is described which was designed to develop more specific diagnostic procedures and instrumentation that would allow both the vocational counselor and the prospective student to determine more effectively specific occupational programs and occupational objectives for education at the postsecondary level. Phases of the project…

  14. Development of guidelines for permitted left-turn phasing using flashing yellow arrows : final report.

    DOT National Transportation Integrated Search

    2015-06-01

    The objective of this project was to develop guidelines for time-of-day use of permitted left-turn phasing, : which can then be implemented using flashing yellow arrows (FYA). This required determining how the risk : for left-turn crashes varied as t...

  15. GeoGIS : phase II.

    DOT National Transportation Integrated Search

    2009-12-01

    A new web-based geotechnical Geographic Information System (GeoGIS) was developed and tested for the Alabama Department of Transportation (ALDOT) during Phase II of this research project. This web-based system stores geotechnical information about tr...

  16. Overview of the Photovoltaic Manufacturing Technology (PVMaT) project

    NASA Astrophysics Data System (ADS)

    Witt, C. E.; Mitchell, R. L.; Mooney, G. D.

    1993-08-01

    The Photovoltaic Manufacturing Technology (PVMaT) project is a historic government/industry photovoltaic (PV) manufacturing R&D partnership composed of joint efforts between the federal government (through the US Department of Energy) and members of the US PV industry. The project's ultimate goal is to ensure that the US industry retains and extends its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is designed to do this by helping the US PV industry improve manufacturing processes, accelerate manufacturing cost reductions for PV modules, improve commercial product performance, and lay the groundwork for a substantial scale-up of US-based PV manufacturing capacities. Phase 1 of the project, the problem identification phase, was completed in early 1991. Phase 2, the problem solution phase, which addresses process-specific problems of specific manufacturers, is now underway with an expected duration of 5 years. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. These 'generic' problem areas are being addressed through a teamed research approach.

  17. The role of technology in reducing health care costs. Phase II and phase III.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cilke, John F.; Parks, Raymond C.; Funkhouser, Donald Ray

    2004-04-01

    In Phase I of this project, reported in SAND97-1922, Sandia National Laboratories applied a systems approach to identifying innovative biomedical technologies with the potential to reduce U.S. health care delivery costs while maintaining care quality. The effort provided roadmaps for the development and integration of technology to meet perceived care delivery requirements and an economic analysis model for development of care pathway costs for two conditions: coronary artery disease (CAD) and benign prostatic hypertrophy (BPH). Phases II and III of this project, which are presented in this report, were directed at detailing the parameters of telemedicine that influence care deliverymore » costs and quality. These results were used to identify and field test the communication, interoperability, and security capabilities needed for cost-effective, secure, and reliable health care via telemedicine.« less

  18. NALDA (Naval Aviation Logistics Data Analysis) CAI (computer aided instruction)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Handler, B.H.; France, P.A.; Frey, S.C.

    Data Systems Engineering Organization (DSEO) personnel developed a prototype computer aided instruction CAI system for the Naval Aviation Logistics Data Analysis (NALDA) system. The objective of this project was to provide a CAI prototype that could be used as an enhancement to existing NALDA training. The CAI prototype project was performed in phases. The task undertaken in Phase I was to analyze the problem and the alternative solutions and to develop a set of recommendations on how best to proceed. The findings from Phase I are documented in Recommended CAI Approach for the NALDA System (Duncan et al., 1987). Inmore » Phase II, a structured design and specifications were developed, and a prototype CAI system was created. A report, NALDA CAI Prototype: Phase II Final Report, was written to record the findings and results of Phase II. NALDA CAI: Recommendations for an Advanced Instructional Model, is comprised of related papers encompassing research on computer aided instruction CAI, newly developing training technologies, instructional systems development, and an Advanced Instructional Model. These topics were selected because of their relevancy to the CAI needs of NALDA. These papers provide general background information on various aspects of CAI and give a broad overview of new technologies and their impact on the future design and development of training programs. The paper within have been index separately elsewhere.« less

  19. Assessing the Financial Value of Patient Engagement: A Quantitative Approach from CTTI's Patient Groups and Clinical Trials Project.

    PubMed

    Levitan, Bennett; Getz, Kenneth; Eisenstein, Eric L; Goldberg, Michelle; Harker, Matthew; Hesterlee, Sharon; Patrick-Lake, Bray; Roberts, Jamie N; DiMasi, Joseph

    2018-03-01

    While patient groups, regulators, and sponsors are increasingly considering engaging with patients in the design and conduct of clinical development programs, sponsors are often reluctant to go beyond pilot programs because of uncertainty in the return on investment. We developed an approach to estimate the financial value of patient engagement. Expected net present value (ENPV) is a common technique that integrates the key business drivers of cost, time, revenue, and risk into a summary metric for project strategy and portfolio decisions. We assessed the impact of patient engagement on ENPV for a typical oncology development program entering phase 2 or phase 3. For a pre-phase 2 project, the cumulative impact of a patient engagement activity that avoids one protocol amendment and improves enrollment, adherence, and retention is an increase in net present value (NPV) of $62MM ($65MM for pre-phase 3) and an increase in ENPV of $35MM ($75MM for pre-phase 3). Compared with an investment of $100,000 in patient engagement, the NPV and ENPV increases can exceed 500-fold the investment. This ENPV increase is the equivalent of accelerating a pre-phase 2 product launch by 2½ years (1½ years for pre-phase 3). Risk-adjusted financial models can assess the impact of patient engagement. A combination of empirical data and subjective parameter estimates shows that engagement activities with the potential to avoid protocol amendments and/or improve enrollment, adherence, and retention may add considerable financial value. This approach can help sponsors assess patient engagement investment decisions.

  20. A system dynamics model of a large R&D program

    NASA Astrophysics Data System (ADS)

    Ahn, Namsung

    Organizations with large R&D activities must deal with a hierarchy of decision regarding resource allocation. At the highest level of allocation, the decision is related to the total allocation to R&D as some portion of revenue. The middle level of allocation deals with the allocation among phases of the R&D process. The lowest level of decisions relates to the resource allocation to specific projects within a specific phase. This study focuses on developing an R&D model to deal with the middle level of allocation, i.e., the allocation among phases of research such as basic research, development, and demonstration. The methodology used to develop the R&D model is System Dynamics. Our modeling concept is innovative in representing each phase of R&D as consisting of two parts: projects under way, and an inventory of successful but not-yet- exploited projects. In a simple world, this concept can yield an exact analytical solution for allocation of resources among phases. But in a real world, the concept should be improved by adding more complex structures with nonlinear behaviors. Two particular nonlinear feedbacks are incorporated into the R&D model. The probability of success for any specific project is assumed partly dependent upon resources allocated to the project. Further, the time required to reach a conclusion regarding the success or failure of a project is also assumed dependent upon the level of resources allocated. In addition, the number of successful projects partly depends on the inventory of potential ideas in the previous stage that can be exploited. This model can provide R&D management with insights into the effect of changing allocations to phases whether those changes are internally or externally driven. With this model, it is possible to study the effectiveness of management decisions in a continuous fashion. Managers can predict payoffs for a host of different policies. In addition, as new research results accumulate, a re- assessment of program goals can be implemented easily and allocations adjusted to enhance continuously the likelihood of success, and to optimize payoffs. Finally, this model can give managers a quantitative rationale for program evaluation and permit the quantitative assessment of various externally imposed changes. (Copies available exclusively from MIT Libraries, Rm. 14-0551, Cambridge, MA 02139-4307. Ph. 617-253-5668; Fax 617-253-1690.)

  1. Developing a holistic accreditation system for medical universities of the Islamic Republic of Iran.

    PubMed

    Yousefy, A; Changiz, T; Yamani, N; Zahrai, R H; Ehsanpour, S

    2009-01-01

    This report describes the steps in the development of an accreditation system for medical universities in the Islamic Republic of Iran. The national accreditation project, supported by the government, was performed from 2001 to 2005. The project was carried out in 3 main phases, each phase including a number of tasks. After a review of the international literature on accreditation and through national consensus, a set of national institutional accreditation standards was developed, including 95 standards and 504 indicators in 10 areas. By complying with accepted national standards, Iranian medical universities will play an important role in promoting health system performance.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacobs, G.K.

    ORNL, through The Consortium for Research on Enhancing Carbon Sequestration in Terrestrial Ecosystems (CSiTE), collaborated with The Village Botanica, Inc. (VB) on a project investigating carbon sequestration in soils and commercial products from a new sustainable crop developed from perennial Hibiscus spp. Over 500 pre-treated samples were analyzed for soil carbon content. ORNL helped design a sampling scheme for soils during the planting phase of the project. Samples were collected and prepared by VB and analyzed for carbon content by ORNL. The project did not progress to a Phase II proposal because VB declined to prepare the required proposal.

  3. Novel Problem Solving - The NASA Solution Mechanism Guide

    NASA Technical Reports Server (NTRS)

    Keeton, Kathryn E.; Richard, Elizabeth E.; Davis, Jeffrey R.

    2014-01-01

    Over the past five years, the Human Health and Performance (HH&P) Directorate at the NASA Johnson Space Center (JSC) has conducted a number of pilot and ongoing projects in collaboration and open innovation. These projects involved the use of novel open innovation competitions that sought solutions from "the crowd", non-traditional problem solvers. The projects expanded to include virtual collaboration centers such as the NASA Human Health and Performance Center (NHHPC) and more recently a collaborative research project between NASA and the National Science Foundation (NSF). These novel problem-solving tools produced effective results and the HH&P wanted to capture the knowledge from these new tools, to teach the results to the directorate, and to implement new project management tools and coursework. The need to capture and teach the results of these novel problem solving tools, the HH&P decided to create a web-based tool to capture best practices and case studies, to teach novice users how to use new problem solving tools and to change project management training/. This web-based tool was developed with a small, multi-disciplinary group and named the Solution Mechanism Guide (SMG). An alpha version was developed that was tested against several sessions of user groups to get feedback on the SMG and determine a future course for development. The feedback was very positive and the HH&P decided to move to the beta-phase of development. To develop the web-based tool, the HH&P utilized the NASA Tournament Lab (NTL) to develop the software with TopCoder under an existing contract. In this way, the HH&P is using one new tool (the NTL and TopCoder) to develop the next generation tool, the SMG. The beta-phase of the SMG is planed for release in the spring of 2014 and results of the beta-phase testing will be available for the IAC meeting in September. The SMG is intended to disrupt the way problem solvers and project managers approach problem solving and to increase the use of novel and more cost and time effective problem solving tools such as open innovation, collaborative research, and virtual collaborative project centers. The HH&P envisions changing project management coursework by including the SMG in the teaching of project management problem solving tools.

  4. Space Shuttle External Tank Project status

    NASA Technical Reports Server (NTRS)

    Davis, R. M.

    1980-01-01

    The External Tank Project is reviewed with emphasis on the DDT&E and production phases and the lightweight tank development. It is noted that the DDT&E phase is progressing well with the structural and ground vibration test article programs complete, the propulsion test article program progressing well, and the component qualification and verification testing 92% complete. New tools and facilities are being brought on line to support the increased build rate for the production phase. The lightweight tank, which will provide additional payload in orbit, is progressing to schedule with first delivery in early 1982.

  5. Milford Visual Communications Project.

    ERIC Educational Resources Information Center

    Milford Exempted Village Schools, OH.

    This study discusses a visual communications project designed to develop activities to promote visual literacy at the elementary and secondary school levels. The project has four phases: (1) perception of basic forms in the environment, what these forms represent, and how they inter-relate; (2) discovery and communication of more complex…

  6. Healthy End of Life Project (HELP): a progress report on implementing community guidance on public health palliative care initiatives in Australia.

    PubMed

    Grindrod, Andrea; Rumbold, Bruce

    2018-04-01

    Contemporary end of life care policies propose increasing community capacity by developing sustainable skills, policies, structures, and resources to support members of a community in caring for each other at the end of life. Public health approaches to palliative care provide strategies to bring this about. Practical implementation can however be ineffective, principally due to failures to grasp the systemic nature of public health interventions, or to ensure that programs are managed and owned by community members, not the professionals who may have introduced them. This article outlines a comprehensive community development project that identifies local end of life needs and meets them through the efficient use of community resources. The project is the product of a three-phase enquiry. The first phase, carried out in a local community, examined carers' experiences of home-based dying, the networks that supported them during care, and broader community networks with the potential to extend care. Data were collected through in-depth research interviews, focus groups and consultation with a community research reference group. Findings were key issues to be targeted by a local community development strategy. In the second phase, these local findings were compared with other practice accounts to identify themes common to many contexts. A public health palliative care framework was then used to produce an evidence-informed community development model for end of life care. The third phase involves implementing and evaluating this model in different Australian contexts. A major theme emerging in phase one of the enquiry was the reluctance of carers to ask for, or even accept, offers of help from family, friends and community networks despite their evident need for support while providing end of life care at home. Others' willingness to provide support was thus hindered by uncertainty about what to offer, and concern about infringing on people's privacy. To develop community capacity for providing end of life care, these social norms need to change. Phase two brought public health strategies to bear on the themes identified in phase one to develop the Healthy End of Life Project (HELP), a strengths-based sustainable community development project. This provides evidence-based and research-informed resources that equip communities to work cooperatively with carers, family, friends and neighbors in support of residents wishing to receive end-of-life care in their home or a community setting. Services may initiate use of the framework, and will share their expertise on health and death matters, but communities are the experts to lead implementation in their local area. The third part of the article outlines current initiatives to implement and evaluate HELP in several Australian contexts. The substantive outcome of this enquiry is the 'Healthy End of Life Project (HELP); offering and providing, asking and accepting help'.

  7. Children as ethnobotanists: methods and local impact of a participatory research project with children on wild plant gathering in the Grosses Walsertal Biosphere Reserve, Austria.

    PubMed

    Grasser, Susanne; Schunko, Christoph; Vogl, Christian R

    2016-10-10

    Ethically sound research in applied ethnobiology should benefit local communities by giving them full access to research processes and results. Participatory research may ensure such access, but there has been little discussion on methodological details of participatory approaches in ethnobiological research. This paper presents and discusses the research processes and methods developed in the course of a three-year research project on wild plant gathering, the involvement of children as co-researchers and the project's indications for local impact. Research was conducted in the Grosses Walsertal Biosphere Reserve, Austria, between 2008 and 2010 in four research phases. In phase 1, 36 freelist interviews with local people and participant observation was conducted. In phase 2 school workshops were held in 14 primary school classes and their 189 children interviewed 506 family members with structured questionnaires. In phase 3, 27 children and two researchers co-produced participatory videos. In phase 4 indications for the impact of the project were investigated with questionnaires from ten children and with participant observation. Children participated in various ways in the research process and the scientific output and local impact of the project was linked to the phases, degrees and methods of children's involvement. Children were increasingly involved in the project, from non-participation to decision-making. Scientific output was generated from participatory and non-participatory activities whereas local impact - on personal, familial, communal and institutional levels - was mainly generated through the participatory involvement of children as interviewers and as co-producers of videos. Creating scientific outputs from participatory video is little developed in ethnobiology, whereas bearing potential. As ethnobotanists and ethnobiologists, if we are truly concerned about the impact and benefits of our research processes and results to local communities, the details of the research processes need to be deliberately planned and evaluated and then reported and discussed in academic publications.

  8. SU-D-17A-02: Four-Dimensional CBCT Using Conventional CBCT Dataset and Iterative Subtraction Algorithm of a Lung Patient

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hu, E; Lasio, G; Yi, B

    2014-06-01

    Purpose: The Iterative Subtraction Algorithm (ISA) method generates retrospectively a pre-selected motion phase cone-beam CT image from the full motion cone-beam CT acquired at standard rotation speed. This work evaluates ISA method with real lung patient data. Methods: The goal of the ISA algorithm is to extract motion and no- motion components form the full reconstruction CBCT. The workflow consists of subtracting from the full CBCT all of the undesired motion phases and obtain a motion de-blurred single-phase CBCT image, followed by iteration of this subtraction process. ISA is realized as follows: 1) The projections are sorted to various phases,more » and from all phases, a full reconstruction is performed to generate an image CTM. 2) Generate forward projections of CTM at the desired phase projection angles, the subtraction of projection and the forward projection will reconstruct a CTSub1, which diminishes the desired phase component. 3) By adding back the CTSub1 to CTm, no motion CBCT, CTS1, can be computed. 4) CTS1 still contains residual motion component. 5) This residual motion component can be further reduced by iteration.The ISA 4DCBCT technique was implemented using Varian Trilogy accelerator OBI system. To evaluate the method, a lung patient CBCT dataset was used. The reconstruction algorithm is FDK. Results: The single phase CBCT reconstruction generated via ISA successfully isolates the desired motion phase from the full motion CBCT, effectively reducing motion blur. It also shows improved image quality, with reduced streak artifacts with respect to the reconstructions from unprocessed phase-sorted projections only. Conclusion: A CBCT motion de-blurring algorithm, ISA, has been developed and evaluated with lung patient data. The algorithm allows improved visualization of a single phase motion extracted from a standard CBCT dataset. This study has been supported by National Institute of Health through R01CA133539.« less

  9. Kindergarten through 12th Grade Project in Career Development and Bridging the Gap Between School and Work: Final Report.

    ERIC Educational Resources Information Center

    Watertown Independent School District 1, SD.

    Divided into four phases, this project in career education includes the following aspects: planning of project policies and activities and securing resource materials; orientation of the school district staff to the project; integration of occupational information, exploration, and career education concepts into the curriculum, identification of…

  10. A Pedagogical Approach toward Teaching an Information Systems Student How to Conduct a Web Usability Study for an Honors Project: A Case Study

    ERIC Educational Resources Information Center

    Jesse, Gayle

    2013-01-01

    The purpose of this paper is to provide educators with a course model and pedagogy to teach a computer information systems usability course. This paper offers a case study based on an honors student project titled "Web Usability: Phases of Developing an Interactive Event Database." Each individual phase--creating a prototype along with…

  11. A Study of the Organization and Search of Bibliographic Holdings Records in On-Line Computer Systems: Phase I. Final Report.

    ERIC Educational Resources Information Center

    Cunningham, Jay L.; And Others

    This report presents the results of the initial phase of the File Organization Project, a study which focuses upon the on-line maintenance and search of the library's catalog holdings record. The focus of the project is to develop a facility for research and experimentation with the many issues of on-line file organizations and search. The first…

  12. Design Tools for Cost-Effective Implementation of Planetary Protection Requirements

    NASA Technical Reports Server (NTRS)

    Hamlin, Louise; Belz, Andrea; Evans, Michael; Kastner, Jason; Satter, Celeste; Spry, Andy

    2006-01-01

    Since the Viking missions to Mars in the 1970s, accounting for the costs associated with planetary protection implementation has not been done systematically during early project formulation phases, leading to unanticipated costs during subsequent implementation phases of flight projects. The simultaneous development of more stringent planetary protection requirements, resulting from new knowledge about the limits of life on Earth, together with current plans to conduct life-detection experiments on a number of different solar system target bodies motivates a systematic approach to integrating planetary protection requirements and mission design. A current development effort at NASA's Jet Propulsion Laboratory is aimed at integrating planetary protection requirements more fully into the early phases of mission architecture formulation and at developing tools to more rigorously predict associated cost and schedule impacts of architecture options chosen to meet planetary protection requirements.

  13. Analysis and experimental demonstration of conformal adaptive phase-locked fiber array for laser communications and beam projection applications

    NASA Astrophysics Data System (ADS)

    Liu, Ling

    The primary goal of this research is the analysis, development, and experimental demonstration of an adaptive phase-locked fiber array system for free-space optical communications and laser beam projection applications. To our knowledge, the developed adaptive phase-locked system composed of three fiber collimators (subapertures) with tip-tilt wavefront phase control at each subaperture represents the first reported fiber array system that implements both phase-locking control and adaptive wavefront tip-tilt control capabilities. This research has also resulted in the following innovations: (a) The first experimental demonstration of a phase-locked fiber array with tip-tilt wave-front aberration compensation at each fiber collimator; (b) Development and demonstration of the fastest currently reported stochastic parallel gradient descent (SPGD) system capable of operation at 180,000 iterations per second; (c) The first experimental demonstration of a laser communication link based on a phase-locked fiber array; (d) The first successful experimental demonstration of turbulence and jitter-induced phase distortion compensation in a phase-locked fiber array optical system; (e) The first demonstration of laser beam projection onto an extended target with a randomly rough surface using a conformal adaptive fiber array system. Fiber array optical systems, the subject of this study, can overcome some of the draw-backs of conventional monolithic large-aperture transmitter/receiver optical systems that are usually heavy, bulky, and expensive. The primary experimental challenges in the development of the adaptive phased-locked fiber-array included precise (<5 microrad) alignment of the fiber collimators and development of fast (100kHz-class) phase-locking and wavefront tip-tilt control systems. The precise alignment of the fiber collimator array is achieved through a specially developed initial coarse alignment tool based on high precision piezoelectric picomotors and a dynamic fine alignment mechanism implemented with specially designed and manufactured piezoelectric fiber positioners. Phase-locking of the fiber collimators is performed by controlling the phases of the output beams (beamlets) using integrated polarization-maintaining (PM) fiber-coupled LiNbO3 phase shifters. The developed phase-locking controllers are based on either the SPGD algorithm or the multi-dithering technique. Subaperture wavefront phase tip-tilt control is realized using piezoelectric fiber positioners that are controlled using a computer-based SPGD controller. Both coherent (phase-locked) and incoherent beam combining in the fiber array system are analyzed theoretically and experimentally. Two special fiber-based beam-combining testbeds have been built to demonstrate the technical feasibility of phase-locking compensation prior to free-space operation. In addition, the reciprocity of counter-propagating beams in a phase-locked fiber array system has been investigated. Coherent beam combining in a phase-locking system with wavefront phase tip-tilt compensation at each subaperture is successfully demonstrated when laboratory-simulated turbulence and wavefront jitters are present in the propagation path of the beamlets. In addition, coherent beam combining with a non-cooperative extended target in the control loop is successfully demonstrated.

  14. Developing Curriculum for Interpreter Training Programs in Vocational Education. Final Report, July 1, 1979-June 30, 1980.

    ERIC Educational Resources Information Center

    Roy, Cynthia B.; And Others

    A project was conducted to develop a curriculum for training interpreters to use American Sign Language (ASL) to serve the deaf. The three-phase project involved (1) a task analysis to catalog the skills needed by interpreters and location of existing materials to determine areas where material needed to be developed; (2) development of a model…

  15. Programmatic Research to Develop and Disseminate Improved Instructional Technology for Handicapped Children. Project MORE Quarterly Progress Report, September 1 to December 1, 1972.

    ERIC Educational Resources Information Center

    Schiefelbusch, Richard L.; Lent, James R.

    During the past reporting period the curriculum development staff of Project MORE (Mediated Operational Research for Education) has made substantial progress in attaining its program objectives. Design and development phases have proceeded on schedule. Four programs are currently in the field-testing stage, and four others are under development.…

  16. Free-Piston Stirling Power Conversion Unit for Fission Power System, Phase II Final Report

    NASA Technical Reports Server (NTRS)

    Wood, J. Gary; Stanley, John

    2016-01-01

    In Phase II, the manufacture and testing of two 6-kW(sub e)Stirling engines was completed. The engines were delivered in an opposed 12-kW(sub e) arrangement with a common expansion space heater head. As described in the Phase I report, the engines were designed to be sealed both hermetically and with a bolted O-ring seal. The completed Phase II convertor is in the bolted configuration to allow future disassembly. By the end of Phase II, the convertor had passed all of the final testing requirements in preparation for delivery to the NASA Glenn Research Center. The electronic controller also was fabricated and tested during Phase II. The controller sets both piston amplitudes and maintains the phasing between them. It also sets the operating frequency of the machine. Details of the controller are described in the Phase I final report. Fabrication of the direct-current to direct-current (DC-DC) output stage, which would have stepped down the main controller output voltage from 700 to 120 V(sub DC), was omitted from this phase of the project for budgetary reasons. However, the main controller was successfully built, tested with the engines, and delivered. We experienced very few development issues with this high-power controller. The project extended significantly longer than originally planned because of yearly funding delays. The team also experienced several hardware difficulties along the development path. Most of these were related to the different thermal expansions of adjacent parts constructed of different materials. This issue was made worse by the large size of the machine. Thermal expansion problems also caused difficulties in the brazing of the opposed stainless steel sodium-potassium (NaK) heater head. Despite repeated attempts Sunpower was not able to successfully braze the opposed head under this project. Near the end of the project, Glenn fabricated an opposed Inconel NaK head, which was installed prior to delivery for testing at Glenn. Engine development prior to this was performed using both single- and dual-opposed (common expansion space) Inconel heads with clamp-on electric heaters.

  17. A portable intra-oral scanner based on sinusoidal pattern of fast phase-shifting

    NASA Astrophysics Data System (ADS)

    Jan, Chia-Ming; Lin, Ying-Chieh

    2016-03-01

    This paper presented our current research about the intra-oral scanner made by MIRDC. Utilizing the sinusoidal pattern for fast phase-shifting technique to deal with 3D digitalization of human dental surface profile, the development of pseudo-phase shifting digital projection can easily achieve one type of full-field scanning instead of the common technique of the laser line scanning. Based on traditional Moiré method, we adopt projecting fringes and retrieve phase reconstruction to forward phase unwrapping. The phase difference between the plane and object can be exactly calculated from the desired fringe images, and the surface profile of object was probably reconstructed by using the phase differences information directly. According to our algorithm of space mapping between projections and capturing orientation exchange of our intra-oral scanning configuration, the system we made certainly can be proved to achieve the required accuracy of +/-10μm to deal with intra-oral scanning on the basis of utilizing active triangulation method. The final purpose aimed to the scanning of object surface profile with its size about 10x10x10mm3.

  18. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    NASA Astrophysics Data System (ADS)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  19. Low NOx Fuel Flexible Combustor Integration Project Overview

    NASA Technical Reports Server (NTRS)

    Walton, Joanne C.; Chang, Clarence T.; Lee, Chi-Ming; Kramer, Stephen

    2015-01-01

    The Integrated Technology Demonstration (ITD) 40A Low NOx Fuel Flexible Combustor Integration development is being conducted as part of the NASA Environmentally Responsible Aviation (ERA) Project. Phase 2 of this effort began in 2012 and will end in 2015. This document describes the ERA goals, how the fuel flexible combustor integration development fulfills the ERA combustor goals, and outlines the work to be conducted during project execution.

  20. Effectiveness of high school safety belt instruction

    DOT National Transportation Integrated Search

    1982-12-01

    The Effectiveness of High School Safety Belt Instruction was developed during a two-phased project. In Phase I, Focus Group Activities were conducted to determine whether audiovisual safety belt instructional materials assembled by the National Highw...

  1. AMD NOX REDUCTION IMPACTS

    EPA Science Inventory

    This is the first phase of a potentially multi-phase project aimed at identifying scientific methodologies that will lead to the development of innnovative analytical tools supporting the analysis of control strategy effectiveness, namely. accountabilty. Significant reductions i...

  2. The solar power satellite - A programme for development aid

    NASA Astrophysics Data System (ADS)

    Meiner, R. C.

    It is pointed out that there are essentially four types of foreign aid. These types include the transfer of knowledge, the transfer of materials, the transfer of funds, and the provision of preferential agreements. A great number of studies have been conducted to assess the pros and cons of a Solar Power Satellite System (SPSS). According to many, the most difficult problems which have to be solved in connection with such a project are related to environmental, societal, political, and institutional aspects. The present investigation is concerned with the initiation of a gradual, phased approach toward a Solar Power Satellite (SPS). Phase I of such an approach would involve the set-up of an organization and the allocation of studies. The building of photovoltaic farms and of an SPS pilot project would occur during the second phase, while development and deployment of a full SPSS would take place during the third phase. The developments are to be financed under foreign aid.

  3. DE-FOA-EE0005502 Advanced Percussive Drilling Technology for Geothermal Exploration and Development Phase II Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Su, Jiann-Cherng; Raymond, David W.; Prasad, Somuri V.

    Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two- phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phasemore » I and evaluating performance of the materials and designs at high- operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for user in the driller's toolbox.« less

  4. Overview and Accomplishments of Advanced Mirror Technology Development Phase 2 (AMTD-2) Project

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip

    2015-01-01

    The Advance Mirror Technology Development (AMTD) project is in Phase 2 of a multiyear effort, initiated in FY12, to mature by at least a half TRL step critical technologies required to enable 4 meter or larger UVOIR space telescope primary mirror assemblies for both general astrophysics and ultra-high contrast observations of exoplanets. AMTD Phase 1 completed all of its goals and accomplished all of its milestones. AMTD Phase 2 started in 2014. Key accomplishments include deriving primary mirror engineering specifications from science requirements; developing integrated modeling tools and using those tools to perform parametric design trades; and demonstrating new mirror technologies via sub-scale fabrication and test. AMTD-1 demonstrated the stacked core technique by making a 43-cm diameter 400 mm thick 'biscuit-cut' of a 4-m class mirror. AMTD-2 is demonstrating lateral scalability of the stacked core method by making a 1.5 meter 1/3rd scale model of a 4-m class mirror.

  5. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doug Cathro

    The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas andmore » Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.« less

  7. The Extreme Ultraviolet Explorer science instruments development - Lessons learned

    NASA Technical Reports Server (NTRS)

    Malina, Roger F.; Battel, S.

    1991-01-01

    The science instruments development project for the Extreme Ultraviolet Explorer (EUVE) satellite is reviewed. Issues discussed include the philosophical basis of the program, the establishment of a tight development team, the approach to planning and phasing activities, the handling of the most difficult technical problems, and the assessment of the work done during the preimplemntation period of the project.

  8. Surface based factory for the production of life support and technology support products

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The presence of a manned space colony on Mars may be expected to involve three phases in the utilization of planetary resources: (1) survival phase in which air, water, and food are produced, (2) self sufficiency phase in which chemicals, fuels, pharmaceuticals, polymers, and metals are produced, and (3) export to earth of materials and technology 1 phase in which the unique advantage of the extraterrestrial environment is fully exploited. The Advanced Design Project is administered as an interdisciplinary effort involving students and faculty throughout the College of Engineering. Senior students from Chemical, Civil, Electrical, and Mechanical Engineering are participating as a team. Multi discipline interfacing and coordination are stressed throughout the project. An interdisciplinary senior design course was developed and offered in the Spring of 1987. The first task of the survival phase is that of providing a supply of water and air adequate to support a ten person colony. The project has been divided into three subgroups: (1) design of a manufacturing and storage facility for air, (2) search and drill for water or water-bearing materials, and (3) retrieve, purify, and store potable water. The conceptual design phase has been completed and the project is being documented. The second task of the survival phase is that of providing a replenish able food supply. This task has two requirements: producing a supply of protein and providing an environment for growing plants for food. For the first requirement, we considered the design of a bioreactor system capable of growing beef cells for protein production. For the second, a design must be developed for a manufacturing system to produce materials needed to build a greenhouse farm.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fred D. Brent; Lalit Shah; Earl Berry

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture of ethylene and propylene chemicals from F-T naphtha, for the generation of hydrogen from F-T naphtha to power fuel cells, for direct blending of F-T diesels into transportation fuels, for the conversion of F-T heavy product wax to transportation fuels, and the conversion of F-T Heavy product wax to a valuable high melting point food-grade specialty wax product. Product evaluations conducted under Task 2.5 of Phase II successfully mitigated the above technical and economic risks to the EECP with the development of product yields and product qualities for the production of chemicals, transportation fuels, and specialty food-grade waxes from the F-T synthesis products.« less

  10. Using Design-Based Research to Improve the Lesson Study Approach to Professional Development in Camden (London)

    ERIC Educational Resources Information Center

    Brown, Chris; Taylor, Carol; Ponambalum, Lorna

    2016-01-01

    The Haverstock Primary to Secondary Transition Project was designed to improve the experience of transition to secondary school for vulnerable pupils in Camden (London). The project used lesson study to help primary and secondary practitioners work collaboratively, to develop effective cross-phase pedagogical approaches to teaching…

  11. Challenges of Critical Colleagueship: Examining and Reflecting on Mathematics Teacher Study Group Interactions

    ERIC Educational Resources Information Center

    Males, Lorraine M.; Otten, Samuel; Herbel-Eisenmann, Beth A.

    2010-01-01

    This article examines mathematics teacher collegiality by focusing on both the ways in which teachers interacted as critical colleagues in a long-term professional development project and the evolving role of the teacher-educator-researcher as the facilitator of this project. The professional development collaboration comprised two phases: one…

  12. Development of wave and surge atlas for the design and protection of coastal bridges in south Louisiana - phase 2, tech summary.

    DOT National Transportation Integrated Search

    2016-08-01

    The first phase of this project, documented in LTRC Final Report 528, developed meteorological/ : oceanographic (met/ocean) data for the 100-year storm return period in south Louisiana and presented the : data in a GIS platform known as the Wave and ...

  13. Early Childhood Technology Integrated Instructional System (EC-TIIS) Phase 1: A Final Report

    ERIC Educational Resources Information Center

    Hutinger, Patricia; Robinson, Linda; Schneider, Carol

    2004-01-01

    The Early Childhood Technology Integrated Instructional System (EC-TIIS), a Steppingstones of Technology Innovation Phase 1--Development project, was developed by the Center for Best Practices in Early Childhood (the Center) at Western Illinois University as an online instructional system. EC-TIIS' ultimate goal was to improve technology services…

  14. Juno Mission Simulation

    NASA Technical Reports Server (NTRS)

    Lee, Meemong; Weidner, Richard J.

    2008-01-01

    The Juno spacecraft is planned to launch in August of 2012 and would arrive at Jupiter four years later. The spacecraft would spend more than one year orbiting the planet and investigating the existence of an ice-rock core; determining the amount of global water and ammonia present in the atmosphere, studying convection and deep- wind profiles in the atmosphere; investigating the origin of the Jovian magnetic field, and exploring the polar magnetosphere. Juno mission management is responsible for mission and navigation design, mission operation planning, and ground-data-system development. In order to ensure successful mission management from initial checkout to final de-orbit, it is critical to share a common vision of the entire mission operation phases with the rest of the project teams. Two major challenges are 1) how to develop a shared vision that can be appreciated by all of the project teams of diverse disciplines and expertise, and 2) how to continuously evolve a shared vision as the project lifecycle progresses from formulation phase to operation phase. The Juno mission simulation team addresses these challenges by developing agile and progressive mission models, operation simulations, and real-time visualization products. This paper presents mission simulation visualization network (MSVN) technology that has enabled a comprehensive mission simulation suite (MSVN-Juno) for the Juno project.

  15. Laser Atmospheric Wind Sounder (LAWS) phase 1. Volume 3: Project cost estimates

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The laser atmospheric wind sounder (LAWS) cost modeling activities were initiated in phase 1 to establish the ground rules and cost model that would apply to both phase 1 and phase 2 cost analyses. The primary emphasis in phase 1 was development of a cost model for a LAWS instrument for the Japanese Polar Orbiting Platform (JPOP). However, the Space Station application was also addressed in this model, and elements were included, where necessary, to account for Space Station unique items. The cost model presented in the following sections defines the framework for all LAWS cost modeling. The model is consistent with currently available detail, and can be extended to account for greater detail as the project definition progresses.

  16. NASA's UAS Integration into the NAS: A Report on the Human Systems Integration Phase 1 Simulation Activities

    NASA Technical Reports Server (NTRS)

    Fern, Lisa; Rorie, R. Conrad; Shively, R. Jay

    2014-01-01

    In 2011 the National Aeronautics and Space Administration (NASA) began a five-year Project to address the technical barriers related to routine access of Unmanned Aerial Systems (UAS) in the National Airspace System (NAS). Planned in two phases, the goal of the first phase was to lay the foundations for the Project by identifying those barriers and key issues to be addressed to achieve integration. Phase 1 activities were completed two years into the five-year Project. The purpose of this paper is to review activities within the Human Systems Integration (HSI) subproject in Phase 1 toward its two objectives: 1) develop GCS guidelines for routine UAS access to the NAS, and 2) develop a prototype display suite within an existing Ground Control Station (GCS). The first objective directly addresses a critical barrier for UAS integration into the NAS - a lack of GCS design standards or requirements. First, the paper describes the initial development of a prototype GCS display suite and supporting simulation software capabilities. Then, three simulation experiments utilizing this simulation architecture are summarized. The first experiment sought to determine a baseline performance of UAS pilots operating in civil airspace under current instrument flight rules for manned aircraft. The second experiment examined the effect of currently employed UAS contingency procedures on Air Traffic Control (ATC) participants. The third experiment compared three GCS command and control interfaces on UAS pilot response times in compliance with ATC clearances. The authors discuss how the results of these and future simulation and flight-testing activities contribute to the development of GCS guidelines to support the safe integration of UAS into the NAS. Finally, the planned activities for Phase 2, including an integrated human-in-the-loop simulation and two flight tests are briefly described.

  17. A strategic plan for the second phase (2013-2015) of the Korea biobank project.

    PubMed

    Park, Ok; Cho, Sang Yun; Shin, So Youn; Park, Jae-Sun; Kim, Jun Woo; Han, Bok-Ghee

    2013-04-01

    The Korea Biobank Project (KBP) was led by the Ministry of Health and Welfare to establish a network between the National Biobank of Korea and biobanks run by university-affiliated general hospitals (regional biobanks). The Ministry of Health and Welfare started the project to enhance medical and health technology by collecting, managing, and providing researchers with high-quality human bioresources. The National Biobank of Korea, under the leadership of the Ministry of Health and Welfare, collects specimens through various cohorts and regional biobanks within university hospitals gather specimens from patients. The project began in 2008, and the first phase ended in 2012, which meant that there needed to be a plan for the second phase that begins in 2013. Consequently, professionals from within and outside the project were gathered to develop a plan for the second phase. Under the leadership of the planning committee, six working groups were formed to formulate a practical plan. By conducting two workshops with experts in the six working groups and the planning committee and three forums in 2011 and 2012, they have developed a strategic plan for the second phase of the KBP. This document presents a brief report of the second phase of the project based on a discussion with them. During the first phase of the project (2008-2012), a network was set up between the National Biobank of Korea and 17 biobanks at university-affiliated hospitals in an effort to unify informatics and governance among the participating biobanks. The biobanks within the network manage data on their biospecimens with a unified Biobank Information Management System. Continuous efforts are being made to develop a common standard operating procedure for resource collection, management, distribution, and personal information security, and currently, management of these data is carried out in a somewhat unified manner. In addition, the KBP has trained and educated professionals to work within the biobanks, and has also carried out various publicity promotions to the public and researchers. During the first phase, biospecimens from more than 300,000 participants through various cohorts and biospecimens from more than 200,000 patients from hospitals were collected, which were distributed to approximately 600 research projects. The planning committee for the second phase evaluated that the first phase of the KBP was successful. However, the first phase of the project was meant to allow autonomy to the individual biobanks. The biobanks were able to choose the kind of specimens they were going to collect and the amount of specimen they would set as a goal, as well as being allowed to choose their own methods to manage their biobanks (autonomy). Therefore, some biobanks collected resources that were easy to collect and the resources needed by researchers were not strategically collected. In addition, there was also a low distribution rate to researchers outside of hospitals, who do not have as much access to specimens and cases as those in hospitals. There were also many cases in which researchers were not aware of the KBP, and the distribution processes were not set up to be convenient to the demands of researchers. Accordingly, the second phase of the KBP will be focused on increasing the integration and cooperation between the biobanks within the network. The KBP plans to set goals for the strategic collection of the needed human bioresources. Although the main principle of the first phase was to establish infrastructure and resource collection, the key objective of the second phase is the efficient utilization of gathered resources. In order to fully utilize the gathered resources in an efficient way, distribution systems and policies must be improved. Vitalization of distribution, securing of high-value resource and related clinical and laboratory information, international standardization of resource management systems, and establishment of a virtuous cycle between research and development (R&D) and biobanks are the four main strategies. Based on these strategies, 12 related objectives have been set and are planned to be executed.

  18. Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

    NASA Technical Reports Server (NTRS)

    Perkey, John K.

    1992-01-01

    The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

  19. IDC Re-Engineering Phase 3 Development Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  20. Trip-generation rates for urban infill land uses in California.

    DOT National Transportation Integrated Search

    2009-06-01

    This report presents the results of the second phase of a two phase research project undertaken by the California Department of Transportation (Caltrans) to study travel characteristics of infill development in Californias metropolitan areas. This...

  1. Trip-generation rates for urban infill land uses in California.

    DOT National Transportation Integrated Search

    2008-04-01

    This report presents the results of the first phase of a two phase research : project undertaken by the California Department of Transportation (Caltrans) : to study travel characteristics of infill development in Californias metropolitan : areas....

  2. Methods of Phase and Power Control in Magnetron Transmitters for Superconducting Accelerators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kazadevich, G.; Johnson, R.; Neubauer, M.

    Various methods of phase and power control in magnetron RF sources of superconducting accelerators intended for ADS-class projects were recently developed and studied with conventional 2.45 GHz, 1 kW, CW magnetrons operating in pulsed and CW regimes. Magnetron transmitters excited by a resonant (injection-locking) phasemodulated signal can provide phase and power control with the rates required for precise stabilization of phase and amplitude of the accelerating field in Superconducting RF (SRF) cavities of the intensity-frontier accelerators. An innovative technique that can significantly increase the magnetron transmitter efficiency at the widerange power control required for superconducting accelerators was developed and verifiedmore » with the 2.45 GHz magnetrons operating in CW and pulsed regimes. High efficiency magnetron transmitters of this type can significantly reduce the capital and operation costs of the ADSclass accelerator projects.« less

  3. Center for Integration of Medicine and Innovative Technology. Addendum

    DTIC Science & Technology

    2009-10-01

    development in biomaterials , endoscopic tools, energy delivery, medical imaging, and other novel technologies. 15. SUBJECT TERMS None provided. 16. SECURITY...below. Issues of Concern We have identified a suitable colla borator to conclude the second an d final phase of this project, namely Dr. Gary...patent application will depend on the results of the second phase of t he project, as well as the ex isting int ellectual property on SEE-fitted

  4. Evaluating Evidence-Based Practice Knowledge and Beliefs Through the e-Learning EBP Academy.

    PubMed

    Green, Angela; Jeffs, Debra A; Boateng, Beatrice A; Lowe, Gary R; Walden, Marlene

    2017-07-01

    This research examined evidence-based practice (EBP) knowledge and beliefs before and after a 3-month e-learning program was implemented to build EBP capacity at a large children's hospital. Ten clinicians completed the development, implementation, and evaluation of the e-learning education, comprising phase one. Revision and participation by 41 clinicians followed in phase two. Participants in both phases completed the EBP Beliefs and Implementation Scales preintervention, postintervention, and 6 months after postintervention. EBP beliefs and implementation increased immediately and 6 months after postintervention, with statistically significant increases in both phases. Participants in both phases applied knowledge by completing mentor-supported EBP projects. Although EBP beliefs and implementation scores increased and e-learning provided flexibility for clinician participation, challenges arose, resulting in lower-than-expected completion. Subsequent revisions resulted in hybrid education, integrating classroom and e-learning with project mentoring. This funded e-learning research contributes knowledge to the growing specialty of professional development. J Contin Educ Nurs. 2017;48(7):304-311. Copyright 2017, SLACK Incorporated.

  5. Two-Phase Flow Technology Developed and Demonstrated for the Vision for Exploration

    NASA Technical Reports Server (NTRS)

    Sankovic, John M.; McQuillen, John B.; Lekan, Jack F.

    2005-01-01

    NASA s vision for exploration will once again expand the bounds of human presence in the universe with planned missions to the Moon and Mars. To attain the numerous goals of this vision, NASA will need to develop technologies in several areas, including advanced power-generation and thermal-control systems for spacecraft and life support. The development of these systems will have to be demonstrated prior to implementation to ensure safe and reliable operation in reduced-gravity environments. The Two-Phase Flow Facility (T(PHI) FFy) Project will provide the path to these enabling technologies for critical multiphase fluid products. The safety and reliability of future systems will be enhanced by addressing focused microgravity fluid physics issues associated with flow boiling, condensation, phase separation, and system stability, all of which are essential to exploration technology. The project--a multiyear effort initiated in 2004--will include concept development, normal-gravity testing (laboratories), reduced gravity aircraft flight campaigns (NASA s KC-135 and C-9 aircraft), space-flight experimentation (International Space Station), and model development. This project will be implemented by a team from the NASA Glenn Research Center, QSS Group, Inc., ZIN Technologies, Inc., and the Extramural Strategic Research Team composed of experts from academia.

  6. Recommended approach to sofware development

    NASA Technical Reports Server (NTRS)

    Mcgarry, F. E.; Page, J.; Eslinger, S.; Church, V.; Merwarth, P.

    1983-01-01

    A set of guideline for an organized, disciplined approach to software development, based on data collected and studied for 46 flight dynamics software development projects. Methods and practices for each phase of a software development life cycle that starts with requirements analysis and ends with acceptance testing are described; maintenance and operation is not addressed. For each defined life cycle phase, guidelines for the development process and its management, and the products produced and their reviews are presented.

  7. A Novel Approach to Practice-Based Learning and Improvement Using a Web-Based Audit and Feedback Module.

    PubMed

    Boggan, Joel C; Cheely, George; Shah, Bimal R; Heffelfinger, Randy; Springall, Deanna; Thomas, Samantha M; Zaas, Aimee; Bae, Jonathan

    2014-09-01

    Systematically engaging residents in large programs in quality improvement (QI) is challenging. To coordinate a shared QI project in a large residency program using an online tool. A web-based QI tool guided residents through a 2-phase evaluation of performance of foot examinations in patients with diabetes. In phase 1, residents completed reviews of health records with online data entry. Residents were then presented with personal performance data relative to peers and were prompted to develop improvement plans. In phase 2, residents again reviewed personal performance. Rates of performance were compared at the program and clinic levels for each phase, with data presented for residents. Acceptability was measured by the number of residents completing each phase. Feasibility was measured by estimated faculty, programmer, and administrator time and costs. Seventy-nine of 86 eligible residents (92%) completed improvement plans and reviewed 1471 patients in phase 1, whereas 68 residents (79%) reviewed 1054 patient charts in phase 2. Rates of performance of examination increased significantly between phases (from 52% to 73% for complete examination, P < .001). Development of the tool required 130 hours of programmer time. Project analysis and management required 6 hours of administrator and faculty time monthly. An online tool developed and implemented for program-wide QI initiatives successfully engaged residents to participate in QI activities. Residents using this tool demonstrated improvement in a selected quality target. This tool could be adapted by other graduate medical education programs or for faculty development.

  8. WEC3: Wave Energy Converter Code Comparison Project: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Combourieu, Adrien; Lawson, Michael; Babarit, Aurelien

    This paper describes the recently launched Wave Energy Converter Code Comparison (WEC3) project and present preliminary results from this effort. The objectives of WEC3 are to verify and validate numerical modelling tools that have been developed specifically to simulate wave energy conversion devices and to inform the upcoming IEA OES Annex VI Ocean Energy Modelling Verification and Validation project. WEC3 is divided into two phases. Phase 1 consists of a code-to-code verification and Phase II entails code-to-experiment validation. WEC3 focuses on mid-fidelity codes that simulate WECs using time-domain multibody dynamics methods to model device motions and hydrodynamic coefficients to modelmore » hydrodynamic forces. Consequently, high-fidelity numerical modelling tools, such as Navier-Stokes computational fluid dynamics simulation, and simple frequency domain modelling tools were not included in the WEC3 project.« less

  9. Phased Array Mirror Extendible Large Aperture (PAMELA) Optics Adjustment

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Scientists at Marshall's Adaptive Optics Lab demonstrate the Wave Front Sensor alignment using the Phased Array Mirror Extendible Large Aperture (PAMELA) optics adjustment. The primary objective of the PAMELA project is to develop methods for aligning and controlling adaptive optics segmented mirror systems. These systems can be used to acquire or project light energy. The Next Generation Space Telescope is an example of an energy acquisition system that will employ segmented mirrors. Light projection systems can also be used for power beaming and orbital debris removal. All segmented optical systems must be adjusted to provide maximum performance. PAMELA is an on going project that NASA is utilizing to investigate various methods for maximizing system performance.

  10. NASA Small Business Innovation Research Program. Composite List of Projects, 1983 to 1989

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The NASA SBIR Composite List of Projects, 1983 to 1989, includes all projects that have been selected for support by the Small Business Innovation Research (SBIR) Program of NASA. The list describes 1232 Phase 1 and 510 Phase 2 contracts that had been awarded or were in negotiation for award in August 1990. The main body is organized alphabetically by name of the small businesses. Four indexes cross-reference the list. The objective of this listing is to provide information about the SBIR program to anyone concerned with NASA research and development activities.

  11. Biomass power for rural development. Technical progress report, May 1, 1996--December 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Developing commercial energy crops for power generation by the year 2000 is the focus of the DOE/USDA sponsored Biomass Power for Rural Development project. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Facette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG). Phase-II of the project willmore » focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. There will be testing of the energy crop as part of the gasification trials expected to occur at BED`s McNeill power station and potentially at one of GPU`s facilities. Phase-III will represent full-scale commercialization of the energy crop and power generation on a sustainable basis. Willow has been selected as the energy crop of choice for many reasons. Willow is well suited to the climate of the Northeastern United States, and initial field trials have demonstrated that the yields required for the success of the project are obtainable. Like other energy crops, willow has rural development benefits and could serve to diversify local crop production, provide new sources of income for participating growers, and create new jobs. Willow could be used to put a large base of idle acreage back into crop production. Additionally, the willow coppicing system integrates well with current farm operations and utilizes agricultural practices that are already familiar to farmers.« less

  12. Liquid sodium testing of in-house phased array EMAT transducer for L-wave applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Bourdais, F.; Le Polles, T.; Baque, F.

    2015-07-01

    This paper describes the development of an in-house phased array EMAT transducer for longitudinal wave inspection in liquid sodium. The work presented herein is part of an undergoing project aimed at improving in-service inspection techniques for the ASTRID reactor project. The design process of the phased array EMAT probe is briefly explained and followed by a review of experimental test results. We first present test results obtained in the laboratory while the last part of the paper describes the liquid sodium testing and the produced ultrasound images. (authors)

  13. Portfolio management in early stage drug discovery - a traveler's guide through uncharted territory.

    PubMed

    Betz, Ulrich A K

    2011-07-01

    Portfolio management in drug development has become a best practice in the pharmaceutical industry. By contrast, early on in the value chain - the discovery phase - portfolio management is still in its infancy. Nevertheless, owing to the attrition of R&D projects from phase to phase and the cost of capital involved, these early phases of drug discovery play a significant part for the overall cost of bringing new, innovative drugs to the market. This paper describes various approaches to manage a portfolio of projects in early-stage drug discovery and provides crucial factors that determine the success of such an approach. Copyright © 2011 Elsevier Ltd. All rights reserved.

  14. A Summary of Project Open Horizons, Phase I: Implementation and Data Analysis.

    ERIC Educational Resources Information Center

    Grantham, Robert J.; Gordon, Myra

    Project "Open Horizons," in Buffalo and Niagara Falls, New York, was born out of a recognition that minority adolescents in disadvantaged communities face serious social and personal problems in the area of career development. The originators of the project were seeking an effective methodology for exposing disadvantaged youth to a…

  15. Implementation project : strengthening a continuous steel girder bridge in Lakeport, Texas with post-installed shear connectors : Phase 1 : bridge strengthening design and load testing.

    DOT National Transportation Integrated Search

    2017-03-01

    In Implementation Project 5-6719, a non-composite continuous steel girder bridge located in Lakeport, Texas will be strengthened using techniques developed in TxDOT Research Project 0-6719. This strengthening technique involves the use of post-instal...

  16. Social Service Aide Project. Summary Reports and Proposals.

    ERIC Educational Resources Information Center

    YMCA of Metropolitan Chicago, IL. Career Options Research and Development (CORD).

    The Social Service Aide Project for the training and education of paraprofessionals is a part of the Career Options Research and Development Project of the Young Men's Christian Association of Chicago. These materials include: (1) "A Report of Pilot A Social Service Aide Program: Phase I and II (September 1969-August 1970)," (2)…

  17. Online Peer Observation: An Exploration of a Cross-Discipline Observation Project

    ERIC Educational Resources Information Center

    Nicolson, Margaret; Harper, Felicity

    2014-01-01

    In this article the authors compare two phases of an ongoing, annual online peer observation project at the Open University. Adopting a non-managerialist approach, the project aims to give teachers a renewed sense of collegiality, allowing them to take responsibility for aspects of their professional development and share practice points. While…

  18. A Project to Design, Develop, Implement, Test, Evaluate and Disseminate an Associate Degree Curriculum to Train Solar Engineering Technicians.

    ERIC Educational Resources Information Center

    Lowenstein, Michael Z.; Orsak, Charles

    Phase 1 of a project in curriculum design and course development identified and is now developing a two-year solar engineering curriculum in response to the immediate need for trained solar manpower as indicated by research. The student-centered curriculum involves courses flowing from device to theory, intermixing of support and technical courses…

  19. Improving image quality in laboratory x-ray phase-contrast imaging

    NASA Astrophysics Data System (ADS)

    De Marco, F.; Marschner, M.; Birnbacher, L.; Viermetz, M.; Noël, P.; Herzen, J.; Pfeiffer, F.

    2017-03-01

    Grating-based X-ray phase-contrast (gbPC) is known to provide significant benefits for biomedical imaging. To investigate these benefits, a high-sensitivity gbPC micro-CT setup for small (≍ 5 cm) biological samples has been constructed. Unfortunately, high differential-phase sensitivity leads to an increased magnitude of data processing artifacts, limiting the quality of tomographic reconstructions. Most importantly, processing of phase-stepping data with incorrect stepping positions can introduce artifacts resembling Moiré fringes to the projections. Additionally, the focal spot size of the X-ray source limits resolution of tomograms. Here we present a set of algorithms to minimize artifacts, increase resolution and improve visual impression of projections and tomograms from the examined setup. We assessed two algorithms for artifact reduction: Firstly, a correction algorithm exploiting correlations of the artifacts and differential-phase data was developed and tested. Artifacts were reliably removed without compromising image data. Secondly, we implemented a new algorithm for flatfield selection, which was shown to exclude flat-fields with strong artifacts. Both procedures successfully improved image quality of projections and tomograms. Deconvolution of all projections of a CT scan can minimize blurring introduced by the finite size of the X-ray source focal spot. Application of the Richardson-Lucy deconvolution algorithm to gbPC-CT projections resulted in an improved resolution of phase-contrast tomograms. Additionally, we found that nearest-neighbor interpolation of projections can improve the visual impression of very small features in phase-contrast tomograms. In conclusion, we achieved an increase in image resolution and quality for the investigated setup, which may lead to an improved detection of very small sample features, thereby maximizing the setup's utility.

  20. 78 FR 9051 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-07

    ... Information Technology Phase 1.'' In accordance with the Paperwork Reduction Act, 44 U.S.C. 3501-3521, AHRQ... Technology Phase 1 This project is the first phase in AHRQ's effort toward the development of a health information technology (HIT) enabled tool designed to aid adolescents and young adults with sickle cell...

  1. Final report on the maintenance asset management project : phase II.

    DOT National Transportation Integrated Search

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  2. Optimal Dredge Fleet Scheduling, Phase 2

    DOT National Transportation Integrated Search

    2017-12-21

    The U.S. Army Corps of Engineers (USACE) annually spends more than 100 million dollars on dredging hundreds of navigation projects on more than 12, 000 miles of inland and intra-coastal waterways. This project expands on a recently developed constrai...

  3. Lessons learned in the transition to Ada from FORTRAN at NASA/Goddard

    NASA Technical Reports Server (NTRS)

    Brophy, Carolyn Elizabeth

    1989-01-01

    Two dynamics satellite simulators are developed from the same requirements, one in Ada and the other in FORTRAN. The purpose of the research was to find out how well the prescriptive Ada development model worked to develop the Ada simulator. The FORTRAN simulator development, as well as past FORTRAN developments, provided a baseline for comparison. Since this was the first simulator developed, the prescriptive Ada development model had many similarities to the usual FORTRAN development model. However, it was modified to include longer design and shorter testing phases, which is generally expected with Ada developments. One result was that the percentage of time the Ada project spent in the various development activities was very similar to the percentage of time spent in these activities when doing a FORTRAN project. Another finding was the difficulty the Ada team had with unit testing as well as with integration. It was realized that adding additional steps to the design phase, such as an abstract data type analysis, and certain guidelines to the implementation phase, such as to use primarily library units and nest sparingly, would have made development easier. These are among the recommendations made to be incorporated in a new Ada development model next time.

  4. Development of decision-making support tools for early right-of-way acquisitions.

    DOT National Transportation Integrated Search

    2010-01-01

    This report documents the work performed during phase two of Project 0-5534, Asset Management Texas : Style. This phase included gathering historical Texas Department of Transportation (TxDOT) right-of-way : acquisition information, analyzi...

  5. Capability of Rolling Efficiency for 100M High-Speed Rails

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huang, Howard

    2014-03-22

    OG Technologies, Inc. (OGT), along with its academic and industrial partners, proposes this CORE project for the Capability of Rolling Efficiency for 100m high-speed rails. The goal is to establish the competitive advantage, and thus the sustainability of the US-based rail manufacturers by greatly enhanced efficiency through innovative in-line metrology technology, in-depth process knowledge, and advanced process control to overcome detrimental factors such as higher labor costs that are saddling the US manufacturing sector. This Phase I project was carried out by an industrial-academia team over 9 months. The R&D team successfully completed all technical tasks and accomplished the objectivesmore » for the Phase I. In addition to the technical efforts, the introductory information of this project as well as anticipated progress was disseminated to steel mills interested in the project. The Phase I project has established the technical and commercial basis for additional development. There are needs to further completing the in-line sensing capability, deepening the capability of metamodeling, and supporting the process monitoring and control. The R&D team plans to submit a Phase II proposal based on the findings.« less

  6. Technical Report on Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Stanley; Sandra Brown; Zoe Kant

    2009-01-07

    The Nature Conservancy participated in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project was 'Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration'. The objectives of the project were to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects, providingmore » new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Final Technical Report discusses the results of the six tasks that The Nature Conservancy undertook to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between July 1st 2001 and July 10th 2008. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. The project occurred in two phases. The first was a focused exploration of specific carbon measurement and monitoring methodologies and pre-selected carbon sequestration opportunities. The second was a more systematic and comprehensive approach to compare various competing measurement and monitoring methodologies, and assessment of a variety of carbon sequestration opportunities in order to find those that are the lowest cost with the greatest combined carbon and other environmental benefits. In the first phase we worked in the U.S., Brazil, Belize, Bolivia, Peru, and Chile to develop and refine specific carbon inventory methods, pioneering a new remote-sensing method for cost-effectively measuring and monitoring terrestrial carbon sequestration and system for developing carbon baselines for both avoided deforestation and afforestation/reforestation projects. We evaluated the costs and carbon benefits of a number of specific terrestrial carbon sequestration activities throughout the U.S., including reforestation of abandoned mined lands in southwest Virginia, grassland restoration in Arizona and Indiana, and reforestation in the Mississippi Alluvial Delta. The most cost-effective U.S. terrestrial sequestration opportunity we found through these studies was reforestation in the Mississippi Alluvial Delta. In Phase II we conducted a more systematic assessment and comparison of several different measurement and monitoring approaches in the Northern Cascades of California, and a broad 11-state Northeast regional assessment, rather than pre-selected and targeted, analysis of terrestrial sequestration costs and benefits. Work was carried out in Brazil, Belize, Chile, Peru and the USA. Partners include the Winrock International Institute for Agricultural Development, The Sampson Group, Programme for Belize, Society for Wildlife Conservation (SPVS), Universidad Austral de Chile, Michael Lefsky, Colorado State University, UC Berkeley, the Carnegie Institution of Washington, ProNaturaleza, Ohio State University, Stephen F. Austin University, Geographical Modeling Services, Inc., WestWater, Los Alamos National Laboratory, Century Ecosystem Services, Mirant Corporation, General Motors, American Electric Power, Salt River Project, Applied Energy Systems, KeySpan, NiSource, and PSEG. This project, 'Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration', has resulted in over 50 presentations and reports, available publicly through the Department of Energy or by visiting the links listed in Appendix 1. More important than the reports, the project has helped to lead to the development of on-the-ground projects in Southwestern Virginia, Louisiana, and Chile while informing policy development in Virginia, the Regional Greenhouse Gas Initiative, the California Climate Action Registry and U.S. and international programs.« less

  7. OC5 Project Phase Ib: Validation of hydrodynamic loading on a fixed, flexible cylinder for offshore wind applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.

    This paper summarizes the findings from Phase Ib of the Offshore Code Comparison, Collaboration, Continued with Correlation (OC5) project. OC5 is a project run under the International Energy Agency (IEA) Wind Research Task 30, and is focused on validating the tools used for modelling offshore wind systems through the comparison of simulated responses of select offshore wind systems (and components) to physical test data. For Phase Ib of the project, simulated hydrodynamic loads on a flexible cylinder fixed to a sloped bed were validated against test measurements made in the shallow water basin at the Danish Hydraulic Institute (DHI) withmore » support from the Technical University of Denmark (DTU). The first phase of OC5 examined two simple cylinder structures (Phase Ia and Ib) to focus on validation of hydrodynamic models used in the various tools before moving on to more complex offshore wind systems and the associated coupled physics. As a result, verification and validation activities such as these lead to improvement of offshore wind modelling tools, which will enable the development of more innovative and cost-effective offshore wind designs.« less

  8. OC5 Project Phase Ib: Validation of hydrodynamic loading on a fixed, flexible cylinder for offshore wind applications

    DOE PAGES

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.; ...

    2016-10-13

    This paper summarizes the findings from Phase Ib of the Offshore Code Comparison, Collaboration, Continued with Correlation (OC5) project. OC5 is a project run under the International Energy Agency (IEA) Wind Research Task 30, and is focused on validating the tools used for modelling offshore wind systems through the comparison of simulated responses of select offshore wind systems (and components) to physical test data. For Phase Ib of the project, simulated hydrodynamic loads on a flexible cylinder fixed to a sloped bed were validated against test measurements made in the shallow water basin at the Danish Hydraulic Institute (DHI) withmore » support from the Technical University of Denmark (DTU). The first phase of OC5 examined two simple cylinder structures (Phase Ia and Ib) to focus on validation of hydrodynamic models used in the various tools before moving on to more complex offshore wind systems and the associated coupled physics. As a result, verification and validation activities such as these lead to improvement of offshore wind modelling tools, which will enable the development of more innovative and cost-effective offshore wind designs.« less

  9. Carbon Capture and Sequestration from a Hydrogen Production Facility in an Oil Refinery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engels, Cheryl; Williams, Bryan, Valluri, Kiranmal; Watwe, Ramchandra

    2010-06-21

    The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. Asmore » part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE?s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities (associated with CO2 capture technologies and geologic sequestration MVA), and Environmental Information Volume. Specific accomplishments of this Phase include: 1. Finalization of the Project Management Plan 2. Development of engineering designs in sufficient detail for defining project performance and costs 3. Preparation of Environmental Information Volume 4. Completion of Hazard Identification Studies 5. Completion of control cost estimates and preparation of business plan During the Phase 1 detailed cost estimate, project costs increased substantially from the previous estimate. Furthermore, the detailed risk assessment identified integration risks associated with potentially impacting the steam methane reformer operation. While the Phase 1 work identified ways to mitigate these integration risks satisfactorily from an operational perspective, the associated costs and potential schedule impacts contributed to the decision not to proceed to Phase 2. We have concluded that the project costs and integration risks at Texas City are not commensurate with the potential benefits of the project at this time.« less

  10. DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM2.5) RESEARCH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson P. Khosah; Charles G. Crawford

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase 1, which is currently in progress and will take twelve months to complete, will include the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. In Phase 2, which will be completed in the second year of the project, a platform for on-line data analysis will be developed. Phase 2 will include the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its eleventh month of Phase 1 development activities.« less

  11. NASA SBIR product catalog, 1990

    NASA Technical Reports Server (NTRS)

    Schwenk, F. Carl; Gilman, J. A.

    1990-01-01

    Since 1983 the NASA Small Business Innovation Research (SBIR) program has benefitted both the agency and the high technology small business community. By making it possible for more small businesses to participate in NASA's research and development, SBIR also provides opportunities for these entrepreneurs to develop products which may also have significant commercial markets. Structured in three phases, the SBIR program uses Phase 1 to assess the technical feasibility of novel ideas proposed by small companies and Phase 2 to conduct research and development on the best concepts. Phase 3, not funded by SBIR, is the utilization and/or commercialization phase. A partial list of products of NASA SBIR projects which have advanced to some degree into Phase 3 are provided with a brief description.

  12. Development and Testing of a Nuclear Quality Assurance/Quality Control Technician Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Espy, John; And Others

    A project was conducted to field test selected first- and second-year courses in a postsecondary nuclear quality assurance/quality control (QA/QC) technician curriculum and to develop the teaching/learning modules for seven technical specialty courses remaining in the QA/QC technician curriculum. The field testing phase of the project involved the…

  13. The Utilization of the Microflora Indigenous to and Present in Oil-Bearing Formations to Selectively Plug the More Porous Zones Thereby Increasing Oil Recovery During Waterflooding

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Lewis R.; Byrnes, Martin J.; Stephens, James O.

    This project was designed to demonstrate that a microbially enhanced oil recovery process (MEOR), developed in part under DOE Contract No. DE-AC22-90BC14665, will increase oil recovery from fluvial dominated deltaic oil reservoirs. The process involves stimulating the in-situ indigenous microbial population in the reservoir to grow in the more permeable zones, thus diverting flow to other areas of the reservoir, thereby increasing the effectiveness of the waterflood. This five and a half year project is divided into three phases, Phase I, Planning and Analysis (9 months), Phase II, Implementation (45 months), and Phase III, Technology Transfer (12 months). Phase Imore » was completed and reported in the first annual report. This fifth annual report covers the completion of Phase II and the first six months of Phase III.« less

  14. AN INNOVATIVE DESIGN FOR ANAEROBIC CO-DIGESTION OF ANIMAL WASTES FOR SUSTAINABLE DEVELOPMENT IN RURAL COMMUNITIES

    EPA Science Inventory

    With the aim of the Phase I project to develop an innovative anaerobic co-digestion design for the treatment of dairy manure and poultry waste, our Phase I team has evaluated the technical and economic feasibility of the anaerobic co-digestion design concept with a thorough in...

  15. "Sounds of Intent", Phase 2: Gauging the Music Development of Children with Complex Needs

    ERIC Educational Resources Information Center

    Ockelford, A.; Welch, G.; Jewell-Gore, L.; Cheng, E.; Vogiatzoglou, A.; Himonides, E.

    2011-01-01

    This article reports the latest phase of research in the "Sounds of intent" project, which is seeking, as a long-term goal, to map musical development in children and young people with severe, or profound and multiple learning difficulties (SLD or PMLD). Previous exploratory work had resulted in a framework of six putative…

  16. Seneca Compressed Air Energy Storage (CAES) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2012-11-30

    Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant constructionmore » with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.« less

  17. Task conflict and team creativity: a question of how much and when.

    PubMed

    Farh, Jiing-Lih; Lee, Cynthia; Farh, Crystal I C

    2010-11-01

    Bridging the task conflict, team creativity, and project team development literatures, we present a contingency model in which the relationship between task conflict and team creativity depends on the level of conflict and when it occurs in the life cycle of a project team. In a study of 71 information technology project teams in the greater China region, we found that task conflict had a curvilinear effect on team creativity, such that creativity was highest at moderate levels of task conflict. Additionally, we found this relationship to be moderated by team phase, such that the curvilinear effect was strongest at an early phase. In contrast, at later phases of the team life cycle, task conflict was found to be unrelated to team creativity. (c) 2010 APA, all rights reserved.

  18. Exactly Embedded Density Functional Theory: A New Paradigm for the First-principles Modeling of Reactions in Complex Systems

    DTIC Science & Technology

    2014-10-14

    applications. By developing both inversion-based and projection -based strategies to enable 1. REPORT DATE (DD-MM-YYYY) 4. TITLE AND SUBTITLE 13...REPORT TYPE 17. LIMITATION OF ABSTRACT 15. NUMBER OF PAGES 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 5c. PROGRAM ELEMENT...constraint that excluded essentially all condensed-phase and reactive chemical applications. By developing both inversion-based and projection -based

  19. Analytical Support to Defence Transformation (Le soutien analytique a la transformation de la Defense)

    DTIC Science & Technology

    2010-04-01

    analytical community. 5.1 Towards a Common Understanding of CD&E and CD&E Project Management Recent developments within NATO have contributed to the... project management purposes it is useful to distinguish four phases [P 21]: a) Preparation, Initiation and Structuring; b) Concept Development Planning...examined in more detail below. While the NATO CD&E policy provides a benchmark for a comprehensive, disciplined management of CD&E projects , it may

  20. Tampa Bay Ecosystem Services Demonstration Project Website: Phase II

    EPA Science Inventory

    The Tampa Bay Ecosystem Services Demonstration Project models the impact of human development and natural stressors on the economic, aesthetic and cultural value of local ecosystems. By linking ecological structures, functions, and condition to the ecosystem services valued by h...

  1. Impact of lane closures on roadway capacity, phase 2.

    DOT National Transportation Integrated Search

    2014-01-01

    This project is a follow-up to Florida Department of Transportation (FDOT) research project BD545-61, Impact of : Lane Closures on Roadway Capacity (specifically, Part A: Development of a Two-Lane Work Zone Lane Closure : Analysis Procedure and...

  2. Controlled ecological life support system breadboard project, 1988

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  3. Smart Grid Cybersecurity: Job Performance Model Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Neil, Lori Ross; Assante, Michael; Tobey, David

    2012-08-01

    This is the project report to DOE OE-30 for the completion of Phase 1 of a 3 phase report. This report outlines the work done to develop a smart grid cybersecurity certification. This work is being done with the subcontractor NBISE.

  4. SIMRAND I- SIMULATION OF RESEARCH AND DEVELOPMENT PROJECTS

    NASA Technical Reports Server (NTRS)

    Miles, R. F.

    1994-01-01

    The Simulation of Research and Development Projects program (SIMRAND) aids in the optimal allocation of R&D resources needed to achieve project goals. SIMRAND models the system subsets or project tasks as various network paths to a final goal. Each path is described in terms of task variables such as cost per hour, cost per unit, availability of resources, etc. Uncertainty is incorporated by treating task variables as probabilistic random variables. SIMRAND calculates the measure of preference for each alternative network. The networks yielding the highest utility function (or certainty equivalence) are then ranked as the optimal network paths. SIMRAND has been used in several economic potential studies at NASA's Jet Propulsion Laboratory involving solar dish power systems and photovoltaic array construction. However, any project having tasks which can be reduced to equations and related by measures of preference can be modeled. SIMRAND analysis consists of three phases: reduction, simulation, and evaluation. In the reduction phase, analytical techniques from probability theory and simulation techniques are used to reduce the complexity of the alternative networks. In the simulation phase, a Monte Carlo simulation is used to derive statistics on the variables of interest for each alternative network path. In the evaluation phase, the simulation statistics are compared and the networks are ranked in preference by a selected decision rule. The user must supply project subsystems in terms of equations based on variables (for example, parallel and series assembly line tasks in terms of number of items, cost factors, time limits, etc). The associated cumulative distribution functions and utility functions for each variable must also be provided (allowable upper and lower limits, group decision factors, etc). SIMRAND is written in Microsoft FORTRAN 77 for batch execution and has been implemented on an IBM PC series computer operating under DOS.

  5. Present status and future directions of the Mayo/IBM PACS project

    NASA Astrophysics Data System (ADS)

    Morin, Richard L.; Forbes, Glenn S.; Gehring, Dale G.; Salutz, James R.; Pavlicek, William

    1991-07-01

    This joint project began in 1988 and was motivated by the need to develop an alternative to the archival process in place at that time (magnetic tape) for magnetic resonance imaging and neurological computed tomography. In addition, this project was felt to be an important step in gaining the necessary clinical experience for the future implementation of various aspects of electronic imaging. The initial phase of the project was conceived and developed to prove the concept, test the fundamental components, and produce performance measurements for future work. The key functions of this phase centered on attachment of imaging equipment (GE Signa) and archival processes using a non-dedicated (institutionally supplied) local area network (LAN). Attachment of imaging equipment to the LAN was performed using commercially available devices (Ethernet, PS/2, Token Ring). Image data were converted to ACR/NEMA format with retention of the vendor specific header information. Performance measurements were encouraging and led to the design of following projects. The second phase has recently been concluded. The major features of this phase have been to greatly expand the network, put the network into clinical use, establish an efficient and useful viewing station, include diagnostic reports in the archive data, provide wide area network (WAN) capability via ISDN, and establish two-way real-time video between remote sites. This phase has heightened both departmental and institutional thought regarding various issues raised by electronic imaging. Much discussion regarding both present as well as future archival processes has occurred. The use of institutional LAN resources has proven to be adequate for the archival function examined thus far. Experiments to date have shown that use of dedicated resources will be necessary for retrieval activities at even a basic level. This report presents an overview of the background present status and future directions of the project.

  6. Non-Invasive Pneumothorax Detector Final Report CRADA No. TC02110.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, J. T.; Purcell, R.

    This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and ElectroSonics Medical Inc. (formerly known as BIOMEC, Inc.), to develop a non-invasive pneumothorax detector based upon the micropower impulse radar technology invented at LLNL. Under a Work for Others Subcontract (L-9248), LLNL and ElectroSonics successfully demonstrated the feasibility of a novel device for non-invasive detection of pneumothorax for emergency and long-term monitoring. The device is based on Micropower Impulse Radar (MIR) Ultra Wideband (UWB) technology. Phase I experimental results were promising, showing that a pneumothorax volume even asmore » small as 30 ml was clearly detectable from the MIR signals. Phase I results contributed to the award of a National Institute of Health (NIH) SBIR Phase II grant to support further research and development. The Phase II award led to the establishment of a LLNL/ElectroSonics CRADA related to Case No. TC02045.0. Under the subsequent CRADA, LLNL and ElectroSonics successfully demonstrated the feasibility of the pneumothorax detection in human subject research trials. Under this current CRADA TC02110.0, also referred to as Phase II Type II, the project scope consisted of seven tasks in Project Year 1; five tasks in Project Year 2; and four tasks in Project Year 3. Year 1 tasks were aimed toward the delivery of the pneumothorax detector design package for the pre-production of the miniaturized CompactFlash dockable version of the system. The tasks in Project Years 2 and 3 critically depended upon the accomplishments of Task 1. Since LLNL’s task was to provide subject matter expertise and performance verification, much of the timeline of engagement by the LLNL staff depended upon the overall project milestones as determined by the lead organization ElectroSonics. The scope of efforts were subsequently adjusted accordingly to commensurate with funding availability.« less

  7. Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steve McRae; Thomas Walsh; Michael Dunn

    2010-02-22

    In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrowmore » Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.« less

  8. Assessing the feasibility, cost, and utility of developing models of human performance in aviation

    NASA Technical Reports Server (NTRS)

    Stillwell, William

    1990-01-01

    The purpose of the effort outlined in this briefing was to determine whether models exist or can be developed that can be used to address aviation automation issues. A multidisciplinary team has been assembled to undertake this effort, including experts in human performance, team/crew, and aviation system modeling, and aviation data used as input to such models. The project consists of two phases, a requirements assessment phase that is designed to determine the feasibility and utility of alternative modeling efforts, and a model development and evaluation phase that will seek to implement the plan (if a feasible cost effective development effort is found) that results from the first phase. Viewgraphs are given.

  9. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  10. Including information technology project management in the nursing informatics curriculum.

    PubMed

    Sockolow, Paulina; Bowles, Kathryn H

    2008-01-01

    Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.

  11. Space Mission Concept Development Using Concept Maturity Levels

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Borden, Chester; Ziemer, John; Kwok, Johnny

    2013-01-01

    Over the past five years, pre-project formulation experts at the Jet Propulsion Laboratory (JPL) has developed and implemented a method for measuring and communicating the maturity of space mission concepts. Mission concept development teams use this method, and associated tools, prior to concepts entering their Formulation Phases (Phase A/B). The organizing structure is Concept Maturity Level (CML), which is a classification system for characterizing the various levels of a concept's maturity. The key strength of CMLs is the ability to evolve mission concepts guided by an incremental set of assessment needs. The CML definitions have been expanded into a matrix form to identify the breadth and depth of analysis needed for a concept to reach a specific level of maturity. This matrix enables improved assessment and communication by addressing the fundamental dimensions (e.g., science objectives, mission design, technical risk, project organization, cost, export compliance, etc.) associated with mission concept evolution. JPL's collaborative engineering, dedicated concept development, and proposal teams all use these and other CML-appropriate design tools to advance their mission concept designs. This paper focuses on mission concept's early Pre-Phase A represented by CMLs 1- 4. The scope was limited due to the fact that CMLs 5 and 6 are already well defined based on the requirements documented in specific Announcement of Opportunities (AO) and Concept Study Report (CSR) guidelines, respectively, for competitive missions; and by NASA's Procedural Requirements NPR 7120.5E document for Projects in their Formulation Phase.

  12. Game Changing Development Program - Next Generation Life Support Project: Oxygen Recovery From Carbon Dioxide Using Ion Exchange Membrane Electrolysis Technology

    NASA Technical Reports Server (NTRS)

    Burke, Kenneth A.; Jiao, Feng

    2016-01-01

    This report summarizes the Phase I research and development work performed during the March 13, 2015 to July 13, 2016 period. The proposal for this work was submitted in response to NASA Research Announcement NNH14ZOA001N, "Space Technology Research, Development, Demonstration, and Infusion 2014 (SpaceTech-REDDI-2014)," Appendix 14GCD-C2 "Game Changing Development Program, Advanced Oxygen Recovery for Spacecraft Life Support Systems Appendix" The Task Agreement for this Phase I work is Document Control Number: GCDP-02-TA-15015. The objective of the Phase I project was to demonstrate in laboratories two Engineering Development Units (EDU) that perform critical functions of the low temperature carbon dioxide electrolysis and the catalytic conversion of carbon monoxide into carbon and carbon dioxide. The low temperature carbon dioxide electrolysis EDU was built by the University of Delaware with Dr. Feng Jiao as the principal investigator in charge of this EDU development (under NASA Contract NNC15CA04C). The carbon monoxide catalytic conversion EDU was built by the NASA Glenn Research Center with Kenneth Burke as the principal investigator and overall project leader for the development of both EDUs. Both EDUs were successfully developed and demonstrated the critical functions for each process. The carbon dioxide electrolysis EDU was delivered to the NASA Johnson Space Center and the carbon monoxide catalytic conversion EDU was delivered to the NASA Marshall Spaceflight Center.

  13. National Skills Standards Development Program: Organization and Operation of Technical Committees To Develop National Skill Standards for Competency in the Electronics Industry. The Third Party Summative Evaluation of the Electronic Industries Foundation Project. Phase I & II. Final Report.

    ERIC Educational Resources Information Center

    Losh, Charles

    The Electronics Industries Foundation was awarded a project to develop national entry-level standards and a certification system. Ten specialties were included: automotive electronics, avionics, biomedical electronics, business machines, consumer products electronics, general electronics, industrial electronics, instrumentation, microcomputer, and…

  14. Assessment of Remote Sensing Technologies for Location of Hydrogen and Helium Leaks

    NASA Technical Reports Server (NTRS)

    Sellar, R. Glenn; Sohn, Yongho; Mathur, Varun; Reardon, Peter

    2001-01-01

    In Phase 1 of this project, a hierarchy of techniques for H2 and He leak location was developed. A total of twelve specific remote sensing techniques were evaluated; the results are summarized. A basic diffusion model was also developed to predict the concentration and distribution of H2 or He resulting from a leak. The objectives of Phase 2 of the project consisted of the following four tasks: Advance Rayleigh Doppler technique from TRL 1 to TRL 2; Plan to advance Rayleigh Doppler technique from TRL 2 to TRL 3; Advance researchers and resources for further advancement; Extend diffusion model.

  15. UAS Integration into the NAS Project

    NASA Technical Reports Server (NTRS)

    Bauer, Jeff

    2010-01-01

    The goal of the UAS Integration in the NAS Project is to contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS This goal will be accomplished through a two-phased approach of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Technical objectives include: PHASE 1: a) Validating the key technical areas identified by this project. System-level analyses, a State of the Art Analysis (SOAA), and a ConOps will identify the challenges and barriers preventing routine UAS access to the NAS. b) Developing a national roadmap and gap analysis identifying specific deliverables in the area of operations, procedures, and technologies that will impact future policy decisions. PHASE 2: a) Provide regulators with a methodology for developing airworthiness requirements for UAS and data to support development of certifications standards and regulatory guidance. b) Provide systems-level integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and Pilot Aircraft Interfaces (PAIs) in operationally relevant environments

  16. Intelligent Medical Systems for Aerospace Emergency Medical Services

    NASA Technical Reports Server (NTRS)

    Epler, John; Zimmer, Gary

    2004-01-01

    The purpose of this project is to develop a portable, hands free device for emergency medical decision support to be used in remote or confined settings by non-physician providers. Phase I of the project will entail the development of a voice-activated device that will utilize an intelligent algorithm to provide guidance in establishing an airway in an emergency situation. The interactive, hands free software will process requests for assistance based on verbal prompts and algorithmic decision-making. The device will allow the CMO to attend to the patient while receiving verbal instruction. The software will also feature graphic representations where it is felt helpful in aiding in procedures. We will also develop a training program to orient users to the algorithmic approach, the use of the hardware and specific procedural considerations. We will validate the efficacy of this mode of technology application by testing in the Johns Hopkins Department of Emergency Medicine. Phase I of the project will focus on the validation of the proposed algorithm, testing and validation of the decision making tool and modifications of medical equipment. In Phase 11, we will produce the first generation software for hands-free, interactive medical decision making for use in acute care environments.

  17. Evolving Jobs and Nonteaching Professional Staff in Universities: An Alternative Perspective on Career Mobility Processes. Final Project Report.

    ERIC Educational Resources Information Center

    Estler, Suzanne E.

    Three technical reports and abstracts of colloquium papers are presented as part of a research project concerning the specification and testing of alternative models of intraorganizational career mobility among nonteaching professionals in universities. This project phase involved: the development of a model of evolving jobs as an alternative to…

  18. Power and Energy Systems Technology Program. Research Series No. 43.

    ERIC Educational Resources Information Center

    Haakenson, Harvey

    The overall objective of this project was to develop a training program and materials for power plant training in North Dakota. The project utilized four separate instructional units and four separate enrollment times with eight students enrolling in each phase to a maximum of thirty-two students. The course that resulted from the project is…

  19. Statistical Process Control. A Summary. FEU/PICKUP Project Report.

    ERIC Educational Resources Information Center

    Owen, M.; Clark, I.

    A project was conducted to develop a curriculum and training materials to be used in training industrial operatives in statistical process control (SPC) techniques. During the first phase of the project, questionnaires were sent to 685 companies (215 of which responded) to determine where SPC was being used, what type of SPC firms needed, and how…

  20. The Elder Abuse Prevention Project, Phase Two, Three and Four. Final Report.

    ERIC Educational Resources Information Center

    Regina Univ. (Saskatchewan). Univ. Extension. Seniors Education Centre.

    This document presents the final report from an educational and community development program designed to raise awareness about the abuse and neglect of the elderly. The Elder Abuse Prevention Project is briefly described in terms of project goals, objectives, the model used, the target groups served, and the evaluation processes employed. It is…

  1. Exploring Transitions in Notions of Identity as Perceived by Beginning Post-Compulsory Teachers

    ERIC Educational Resources Information Center

    Wright, Victoria; Loughlin, Theresa; Hall, Val

    2018-01-01

    This paper reports on Phase Two of a small-scale qualitative research project. Phase One (2015-2016) focused on pre-service student teachers' perceptions of observation and feedback in relation to their developing identity as teachers. In Phase Two, two previous participants reflected on the research findings as qualified and beginning teachers.…

  2. Verification and Validation Strategy for Implementation of Hybrid Potts-Phase Field Hydride Modeling Capability in MBM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jason D. Hales; Veena Tikare

    2014-04-01

    The Used Fuel Disposition (UFD) program has initiated a project to develop a hydride formation modeling tool using a hybrid Potts­phase field approach. The Potts model is incorporated in the SPPARKS code from Sandia National Laboratories. The phase field model is provided through MARMOT from Idaho National Laboratory.

  3. Results from the electro-optic sensors domain of the materials and components for missiles innovation and technology partnership (phase 1)

    NASA Astrophysics Data System (ADS)

    Bray, Mark E.; Shears, Robert A.

    2013-10-01

    The Materials and Components for Missiles Innovation and Technology Partnership (ITP) is a research programme supporting research for guided weapons at Technology Readiness Levels 1 to 4. The Anglo-French initiative is supported by the DGA and the MoD, with matched funding from industry. A major objective is to foster projects which partner UK and French universities, SMEs and larger companies. The first projects started in January 2008 and the first phase completed in spring 2013. Providing funding is secured, the next phase of the programme is due to start later in 2013. Selex ES leads Domain 3 of the MCM-ITP which develops Electro-Optic sensor technology. In collaboration with DGA, MoD and MBDA, the prime contractor, we identified 4 key objectives for the first ITP phase and focussed resources on achieving these. The objectives were to enable better imagery, address operationally stressing scenarios, provide low overall through life cost and improve active and semi-active sensors Nine normal projects and one ITP innovation fund project have been supported within the domain. The technology providers have included 3 SMEs and 8 research centres from both the United Kingdom and France. Highlights of the projects are included. An outline of the priorities for the domain for the new phase ise provided and we encourage organisations with suitable technology to contact us to get involved.

  4. Youth's social network structures and peer influences: study protocol MyMovez project - Phase I.

    PubMed

    Bevelander, Kirsten E; Smit, Crystal R; van Woudenberg, Thabo J; Buijs, Laura; Burk, William J; Buijzen, Moniek

    2018-04-16

    Youth are an important target group for social network interventions, because they are particularly susceptible to the adaptation of healthy and unhealthy habits and behaviors of others. They are surrounded by 'social influence agents' (i.e., role models such as family, friends and peers) that co-determine their dietary intake and physical activity. However, there is a lack of systematic and comprehensive research on the implementation of a social network approach in health campaigns. The MyMovez research project aims to fill this gap by developing a method for effective social network campaign implementation. This protocol paper describes the design and methods of Phase I of the MyMovez project, aiming to unravel youth's social network structures in combination with individual, psychosocial, and environmental factors related to energy intake and expenditure. In addition, the Wearable Lab is developed to enable an attractive and state-of-the-art way of collecting data and online campaign implementation via social networks. Phase I of the MyMovez project consists of a large-scale cross-sequential cohort study (N = 953; 8-12 and 12-15 y/o). In five waves during a 3-year period (2016-2018), data are collected about youth's social network exposure, media consumption, socialization experiences, psychological determinants of behavior, physical environment, dietary intake (snacking and drinking behavior) and physical activity using the Wearable Lab. The Wearable Lab exists of a smartphone-based research application (app) connected to an activity tracking bracelet, that is developed throughout the duration of the project. It generates peer- and self-reported (e.g., sociometric data and surveys) and experience sampling data, social network beacon data, real-time physical activity data (i.e., steps and cycling), location information, photos and chat conversation data from the app's social media platform Social Buzz. The MyMovez project - Phase I is an innovative cross-sequential research project that investigates how social influences co-determine youth's energy intake and expenditure. This project utilizes advanced research technologies (Wearable Lab) that provide unique opportunities to better understand the underlying processes that impact youths' health-related behaviors. The project is theoretically and methodologically pioneering and produces a unique and useful method for successfully implementing and improving health campaigns.

  5. Redefining the lower statistical limit in x-ray phase-contrast imaging

    NASA Astrophysics Data System (ADS)

    Marschner, M.; Birnbacher, L.; Willner, M.; Chabior, M.; Fehringer, A.; Herzen, J.; Noël, P. B.; Pfeiffer, F.

    2015-03-01

    Phase-contrast x-ray computed tomography (PCCT) is currently investigated and developed as a potentially very interesting extension of conventional CT, because it promises to provide high soft-tissue contrast for weakly absorbing samples. For data acquisition several images at different grating positions are combined to obtain a phase-contrast projection. For short exposure times, which are necessary for lower radiation dose, the photon counts in a single stepping position are very low. In this case, the currently used phase-retrieval does not provide reliable results for some pixels. This uncertainty results in statistical phase wrapping, which leads to a higher standard deviation in the phase-contrast projections than theoretically expected. For even lower statistics, the phase retrieval breaks down completely and the phase information is lost. New measurement procedures rely on a linear approximation of the sinusoidal phase stepping curve around the zero crossings. In this case only two images are acquired to obtain the phase-contrast projection. The approximation is only valid for small phase values. However, typically nearly all pixels are within this regime due to the differential nature of the signal. We examine the statistical properties of a linear approximation method and illustrate by simulation and experiment that the lower statistical limit can be redefined using this method. That means that the phase signal can be retrieved even with very low photon counts and statistical phase wrapping can be avoided. This is an important step towards enhanced image quality in PCCT with very low photon counts.

  6. Maintenance Decision Support System, Phase III

    DOT National Transportation Integrated Search

    2017-09-01

    The main goal of the project was to address barriers that limit NDOTs ability to implement MDSS and MMS systems. The four project tasks included: Task 1: Develop system for tracking sand and/or deicing material usage: A system that tracks where and w...

  7. Estimation of traffic impacts at work zones : state of the practice.

    DOT National Transportation Integrated Search

    2006-01-01

    Assessing the safety and mobility impacts of work zones across the project development phases of road construction and maintenance projects is an emphasis area of the Federal Highway Administration's Final Rule on Work Zone Safety and Mobility1 (Fina...

  8. Development of Uniform Sections for PMS Inventory and Application.

    DOT National Transportation Integrated Search

    2007-12-01

    This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. : The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system : (PMS). Results...

  9. Access to destinations : annual accessibility measure for the Twin Cities Metropolitan Region.

    DOT National Transportation Integrated Search

    2012-11-01

    This report summarizes previous phases of the Access to Destinations project and applies the techniques developed : over the course of the project to conduct an evaluation of accessibility in the Twin Cities metropolitan region for : 2010. It describ...

  10. Computer-aided software development process design

    NASA Technical Reports Server (NTRS)

    Lin, Chi Y.; Levary, Reuven R.

    1989-01-01

    The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

  11. Automobile driver on-road performance test. Volume 1, final report

    DOT National Transportation Integrated Search

    1981-09-30

    The Automobile Driver On-Road Performance Test (ADOPT) was developed during a three-phase project. In Phase 1, 51 candidate behaviors were identified and selected with the help of experts in the fields of traffic safety, measurement of driver perform...

  12. Factors Influencing Operating Speeds and Safety on Rural and Suburban Roads

    DOT National Transportation Integrated Search

    2015-05-01

    The objective of this project was to develop a technical report that describes treatments that result in driver self-selection of appropriate operational speeds on curve and tangent sections. The study was conducted in two phases. The first phase inc...

  13. SOLVENT NANOFILTRATION USING LOW-COST INORGANIC MEMBRANE MODULES - PHASE I

    EPA Science Inventory

    This Phase I project addresses: (1) development of fully inorganic nanofiltration (NF) membrane modules that have the attributes of low-cost, excellent chemical resistance in aggressive organic and aqueous media and high thermal stability; and (2) demonstration of the perfo...

  14. Involving People with Autism in Development of Virtual World for Provision of Skills Training

    ERIC Educational Resources Information Center

    Politis, Yurgos; Olivia, Louis; Olivia, Thomas; Sung, Connie

    2017-01-01

    This paper presents the development phase of the of the Virtual World that is going to be used by the Virtual Learning for People with Autistic Spectrum Disorder (VL4ASD) project, which aims to create training materials on conversation skills. This project is geared towards addressing the communication deficits of ASD populations, by exploring the…

  15. Designing an Interactive OER Course Development at Athabasca University Based on ODL Principles

    ERIC Educational Resources Information Center

    Yan, Hongxin; Law, Sandra

    2013-01-01

    Failure rates in first year calculus courses are high in most post-secondary institutions across North America and other parts of the world. This Inukshuk-funded open education project involved the development of five stand-alone pre-calculus learning modules. The design and revision phases of this project occurred between the fall of 2007 and…

  16. Development of Procedures for Generating Alternative Allied Health Manpower Requirements and Supply Estimates.

    ERIC Educational Resources Information Center

    Applied Management Sciences, Inc., Silver Spring, MD.

    This report presents results of a project to assess the adequacy of existing data sources on the supply of 21 allied health occupations in order to develop improved data collection strategies and improved procedures for estimation of manpower needs. Following an introduction, chapter 2 provides a discussion of the general phases of the project and…

  17. A Report of On-Going Research Aimed at Developing Unweighted and Weighted Syllable Lists.

    ERIC Educational Resources Information Center

    Sakiey, Elizabeth

    Knowing which syllables are most commonly used should aid in linguistic research and in the preparation of curriculum materials, particularly in reading. A research project has been undertaken to develop unweighted and weighted (by the frequency of the words in which they appear) syllable lists. At present, two of the project's three phases are…

  18. A Novel Approach to Practice-Based Learning and Improvement Using a Web-Based Audit and Feedback Module

    PubMed Central

    Boggan, Joel C.; Cheely, George; Shah, Bimal R.; Heffelfinger, Randy; Springall, Deanna; Thomas, Samantha M.; Zaas, Aimee; Bae, Jonathan

    2014-01-01

    Background Systematically engaging residents in large programs in quality improvement (QI) is challenging. Objective To coordinate a shared QI project in a large residency program using an online tool. Methods A web-based QI tool guided residents through a 2-phase evaluation of performance of foot examinations in patients with diabetes. In phase 1, residents completed reviews of health records with online data entry. Residents were then presented with personal performance data relative to peers and were prompted to develop improvement plans. In phase 2, residents again reviewed personal performance. Rates of performance were compared at the program and clinic levels for each phase, with data presented for residents. Acceptability was measured by the number of residents completing each phase. Feasibility was measured by estimated faculty, programmer, and administrator time and costs. Results Seventy-nine of 86 eligible residents (92%) completed improvement plans and reviewed 1471 patients in phase 1, whereas 68 residents (79%) reviewed 1054 patient charts in phase 2. Rates of performance of examination increased significantly between phases (from 52% to 73% for complete examination, P < .001). Development of the tool required 130 hours of programmer time. Project analysis and management required 6 hours of administrator and faculty time monthly. Conclusions An online tool developed and implemented for program-wide QI initiatives successfully engaged residents to participate in QI activities. Residents using this tool demonstrated improvement in a selected quality target. This tool could be adapted by other graduate medical education programs or for faculty development. PMID:26279782

  19. 10 MW Supercritical CO2 Turbine Test

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turchi, Craig

    2014-01-29

    The Supercritical CO2 Turbine Test project was to demonstrate the inherent efficiencies of a supercritical carbon dioxide (s-CO2) power turbine and associated turbomachinery under conditions and at a scale relevant to commercial concentrating solar power (CSP) projects, thereby accelerating the commercial deployment of this new power generation technology. The project involved eight partnering organizations: NREL, Sandia National Laboratories, Echogen Power Systems, Abengoa Solar, University of Wisconsin at Madison, Electric Power Research Institute, Barber-Nichols, and the CSP Program of the U.S. Department of Energy. The multi-year project planned to design, fabricate, and validate an s-CO2 power turbine of nominally 10 MWemore » that is capable of operation at up to 700°C and operates in a dry-cooled test loop. The project plan consisted of three phases: (1) system design and modeling, (2) fabrication, and (3) testing. The major accomplishments of Phase 1 included: Design of a multistage, axial-flow, s-CO2 power turbine; Design modifications to an existing turbocompressor to provide s-CO2 flow for the test system; Updated equipment and installation costs for the turbomachinery and associated support infrastructure; Development of simulation tools for the test loop itself and for more efficient cycle designs that are of greater commercial interest; Simulation of s-CO2 power cycle integration into molten-nitrate-salt CSP systems indicating a cost benefit of up to 8% in levelized cost of energy; Identification of recuperator cost as a key economic parameter; Corrosion data for multiple alloys at temperatures up to 650ºC in high-pressure CO2 and recommendations for materials-of-construction; and Revised test plan and preliminary operating conditions based on the ongoing tests of related equipment. Phase 1 established that the cost of the facility needed to test the power turbine at its full power and temperature would exceed the planned funding for Phases 2 and 3. Late in Phase 1 an opportunity arose to collaborate with another turbine-development team to construct a shared s-CO2 test facility. The synergy of the combined effort would result in greater facility capabilities than either separate project could produce and would allow for testing of both turbine designs within the combined budgets of the two projects. The project team requested a no-cost extension to Phase 1 to modify the subsequent work based on this collaborative approach. DOE authorized a brief extension, but ultimately opted not to pursue the collaborative facility and terminated the project.« less

  20. Design of a Model Management Information System (MIS) for California's Regional Occupational Centers and Programs. Final Report.

    ERIC Educational Resources Information Center

    Dick, James C.; And Others

    The management information system (MIS) development project for California's Regional Occupational Centers and Programs (ROC/Ps) was conducted in 3 phases over a 12-month period. Phase I involved a literature review and field study to match MIS design features and development strategy with existing conditions in ROC/Ps. A decision support system…

  1. Development of a Hydrologic Characterization Technology for Fault Zones Phase II 2nd Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karasaki, Kenzi; Doughty, Christine; Gasperikova, Erika

    2011-03-31

    This is the 2nd report on the three-year program of the 2nd phase of the NUMO-LBNL collaborative project: Development of Hydrologic Characterization Technology for Fault Zones under NUMO-DOE/LBNL collaboration agreement. As such, this report is a compendium of the results by Kiho et al. (2011) and those by LBNL.

  2. History of San Marco

    NASA Technical Reports Server (NTRS)

    Caporale, A. J.

    1968-01-01

    A brief history is reported of the first San Marco project, a joint program of the United States and Italy. The Project was a three phase effort to investigate upper air density and associated ionosphere phenomena. The initial phase included the design and development of the spacecraft, the experiments, the launch complex, and a series of suborbital flights, from Wallops Island. The second phase, consisting of designing, fabricating, and testing a spacecraft for the first orbital mission, culminated in an orbital launch also from Wallops Island. The third phase consisted of further refining the experiments and spacecraft instrumentation and of establishing a full-bore scout complex in Kenya. The launch of San Marco B, in April 1967, from this complex into an equatorial orbit, concluded the initial San Marco effort.

  3. Training strategies and materials.

    DOT National Transportation Integrated Search

    2008-08-01

    TxDOT project 0-5840 Development of Left-Turn Operations Guidelines at Signalized Intersections has developed : guidelines for recommending the most appropriate left-turn phasing treatments at signalized intersections by investigating all : asp...

  4. Multiphase Flow Technology Impacts on Thermal Control Systems for Exploration

    NASA Technical Reports Server (NTRS)

    McQuillen, John; Sankovic, John; Lekan, Jack

    2006-01-01

    The Two-Phase Flow Facility (TPHIFFy) Project focused on bridging the critical knowledge gap by developing and demonstrating critical multiphase fluid products for advanced life support, thermal management and power conversion systems that are required to enable the Vision for Space Exploration. Safety and reliability of future systems will be enhanced by addressing critical microgravity fluid physics issues associated with flow boiling, condensation, phase separation, and system stability. The project included concept development, normal gravity testing, and reduced gravity aircraft flight campaigns, in preparation for the development of a space flight experiment implementation. Data will be utilized to develop predictive models that could be used for system design and operation. A single fluid, two-phase closed thermodynamic loop test bed was designed, assembled and tested. The major components in this test bed include: a boiler, a condenser, a phase separator and a circulating pump. The test loop was instrumented with flow meters, thermocouples, pressure transducers and both high speed and normal speed video cameras. A low boiling point surrogate fluid, FC-72, was selected based on scaling analyses using preliminary designs for operational systems. Preliminary results are presented which include flow regime transitions and some observations regarding system stability.

  5. Integrated Knowledge Translation and Grant Development: Addressing the Research Practice Gap through Stakeholder-informed Research.

    PubMed

    Henderson, Joanna; Brownlie, Elizabeth; Rosenkranz, Susan; Chaim, Gloria; Beitchman, Joseph

    2013-11-01

    We describe our stakeholder engagement process for grant application development that occurred as part of our integrated knowledge translation plan and make recommendations for researchers. In phase 1, a stakeholder consultation group was developed. In phase 2, surveys regarding knowledge gathering, research agenda, and research collaboration preferences were sent to 333 cross-sectoral youth-serving organizations in Ontario, including family and consumer organizations. In phase 1, 28 stakeholders from six sectors participated in the consultation group and provided input on multiple aspects of the proposal. Through this process, 19 stakeholders adopted formal roles within the project. In phase 2, 206 surveys were received (response rate = 62%). Survey responses supported the grant focus (concurrent youth mental health and substance use problems). Respondents also prioritized project goals and provided specific feedback on research and knowledge translation. Finally, although some stakeholders chose greater involvement, most survey respondents indicated a preference for a moderate level of participation in research rather than full team membership. Despite short timelines and feasibility challenges, stakeholders can be meaningfully engaged in and contribute to the grant proposal development process. Consideration is needed for the practical challenges that stakeholder organizations face in supporting and participating in research.

  6. Continued Development and Improvement of Pneumatic Heavy Vehicles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert J. Englar

    2005-07-15

    The objective of this applied research effort led by Georgia Tech Research Institute is the application of pneumatic aerodynamic technology previously developed and patented by us to the design of an appropriate Heavy Vehicle (HV) tractor-trailer configuration, and experimental confirmation of this pneumatic configuration's improved aerodynamic characteristics. In Phases I to IV of our previous DOE program (Reference 1), GTRI has developed, patented, wind-tunnel tested and road-tested blown aerodynamic devices for Pneumatic Heavy Vehicles (PHVs) and Pneumatic Sports Utility Vehicles (PSUVs). To further advance these pneumatic technologies towards HV and SUV applications, additional Phase V tasks were included in themore » first year of a continuing DOE program (Reference 2). Based on the results of the Phase IV full-scale test programs, these Phase V tasks extended the application of pneumatic aerodynamics to include: further economy and performance improvements; increased aerodynamic stability and control; and safety of operation of Pneumatic HVs. Continued development of a Pneumatic SUV was also conducted during the Phase V program. Phase V was completed in July, 2003; its positive results towards development and confirmation of this pneumatic technology are reported in References 3 and 4. The current Phase VI of this program was incrementally funded by DOE in order to continue this technology development towards a second fuel economy test on the Pneumatic Heavy Vehicle. The objectives of this current Phase VI research and development effort (Ref. 5) fall into two categories: (1) develop improved pneumatic aerodynamic technology and configurations on smaller-scale models of the advanced Pneumatic Heavy Vehicle (PHV); and based on these findings, (2) redesign, modify, and re-test the modified full-scale PHV test vehicle. This second objective includes conduct of an on-road preliminary road test of this configuration to prepare it for a second series of SAE Type-U fuel economy evaluations, as described in Ref. 5. Both objectives are based on the pneumatic technology already developed and confirmed for DOE OHVT/OAAT in Phases I-V. This new Phase VI effort was initiated by contract amendment to the Phase V effort using carryover FY02 funds. This were conducted under a new and distinct project number, GTRI Project A-6935, separate from the Phase I-IV program. However, the two programs are closely integrated, and thus Phase VI continues with the previous program and goals.« less

  7. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understandingmore » of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.« less

  8. Projection of the Liquidus Surface of the Co - Sn - Bi System

    NASA Astrophysics Data System (ADS)

    Abilov, Ch. I.; Allazov, M. R.; Sadygova, S. G.

    2016-11-01

    The crystallization behavior of phases in alloys of the Co - Sn - Bi system is studied by the methods of differential thermal (DTA), x-ray phase (XRP) and x-ray diffraction (XRD) analyses and hardness measurement. The projection of the liquidus surface is plotted. The boundaries of layering, the development of the monovariant processes, and the coordinates of the nonvariant equilibrium compositions are determined. Compositions of (Co3Sn2)1 - x Bi x solid solutions suitable for the production of antifriction materials are suggested.

  9. Practical experience with test-driven development during commissioning of the multi-star AO system ARGOS

    NASA Astrophysics Data System (ADS)

    Kulas, M.; Borelli, Jose Luis; Gässler, Wolfgang; Peter, Diethard; Rabien, Sebastian; Orban de Xivry, Gilles; Busoni, Lorenzo; Bonaglia, Marco; Mazzoni, Tommaso; Rahmer, Gustavo

    2014-07-01

    Commissioning time for an instrument at an observatory is precious, especially the night time. Whenever astronomers come up with a software feature request or point out a software defect, the software engineers have the task to find a solution and implement it as fast as possible. In this project phase, the software engineers work under time pressure and stress to deliver a functional instrument control software (ICS). The shortness of development time during commissioning is a constraint for software engineering teams and applies to the ARGOS project as well. The goal of the ARGOS (Advanced Rayleigh guided Ground layer adaptive Optics System) project is the upgrade of the Large Binocular Telescope (LBT) with an adaptive optics (AO) system consisting of six Rayleigh laser guide stars and wavefront sensors. For developing the ICS, we used the technique Test- Driven Development (TDD) whose main rule demands that the programmer writes test code before production code. Thereby, TDD can yield a software system, that grows without defects and eases maintenance. Having applied TDD in a calm and relaxed environment like office and laboratory, the ARGOS team has profited from the benefits of TDD. Before the commissioning, we were worried that the time pressure in that tough project phase would force us to drop TDD because we would spend more time writing test code than it would be worth. Despite this concern at the beginning, we could keep TDD most of the time also in this project phase This report describes the practical application and performance of TDD including its benefits, limitations and problems during the ARGOS commissioning. Furthermore, it covers our experience with pair programming and continuous integration at the telescope.

  10. System testing of a production Ada (trademark) project: The GRODY study

    NASA Technical Reports Server (NTRS)

    Seigle, Jeffrey; Esker, Linda; Shi, Ying-Liang

    1990-01-01

    The use of the Ada language and design methodologies that utilize its features has a strong impact on all phases of the software development project lifecycle. At the National Aeronautics and Space Administration/Goddard Space Flight Center (NASA/GSFC), the Software Engineering Laboratory (SEL) conducted an experiment in parallel development of two flight dynamics systems in FORTRAN and Ada. The teams found some qualitative differences between the system test phases of the two projects. Although planning for system testing and conducting of tests were not generally affected by the use of Ada, the solving of problems found in system testing was generally facilitated by Ada constructs and design methodology. Most problems found in system testing were not due to difficulty with the language or methodology but to lack of experience with the application.

  11. Development of a Pattern Recognition Methodology for Determining Operationally Optimal Heat Balance Instrumentation Calibration Schedules

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurt Beran; John Christenson; Dragos Nica

    2002-12-15

    The goal of the project is to enable plant operators to detect with high sensitivity and reliability the onset of decalibration drifts in all of the instrumentation used as input to the reactor heat balance calculations. To achieve this objective, the collaborators developed and implemented at DBNPS an extension of the Multivariate State Estimation Technique (MSET) pattern recognition methodology pioneered by ANAL. The extension was implemented during the second phase of the project and fully achieved the project goal.

  12. ESP: Economics of Shipyard Painting, Bid Estimating Transfer Study

    DTIC Science & Technology

    1993-11-10

    Estimating Transfer Study Final Report i EXECUTIVE SUMMARY During Phase I of the “Economics of Shipyard Painting” project, it became evident that detail...an SP-3 panel directive to establish a 2nd phase of the “Economics of Shipyard Painting” focussed on applying the detailed data collected in Phase I to...bid-stage estimating. During Phase II, a program was developed that worked in tandem with the detailed data collection effort laid out in Phase I

  13. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bonnal, P.; Féral, B.; Kershaw, K.

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies andmore » development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.« less

  14. Reducing Subjectivity in Geothermal Exploration Decision Making (Presentation); NREL(National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Akar, S.; Young, K.

    Geothermal exploration projects have a significant amount of risk associated with uncertainties encountered in the discovery of the geothermal resource. Two of the largest challenges for increased geothermal deployment are 1) understanding when and how to proceed in an exploration program, and 2) when to walk away from a site. Current methodologies for exploration decision-making are formulatedby subjective expert opinion which can be incorrectly biased by expertise (e.g. geochemistry, geophysics), geographic location of focus, and the assumed conceptual model. The aim of this project is to develop a methodology for more objective geothermal exploration decision making at a given location,more » including go/no-go decision points to help developers and investors decide when to give up on alocation. In this scope, two different approaches are investigated: 1) value of information analysis (VOIA) which is used for evaluating and quantifying the value of a data before they are purchased, and 2) enthalpy-based exploration targeting based on reservoir size, temperature gradient estimates, and internal rate of return (IRR). The first approach, VOIA, aims to identify the value of aparticular data when making decisions with an uncertain outcome. This approach targets the pre-drilling phase of exploration. These estimated VOIs are highly affected by the size of the project and still have a high degree of subjectivity in assignment of probabilities. The second approach, exploration targeting, is focused on decision making during the drilling phase. It starts with a basicgeothermal project definition that includes target and minimum required production capacity and initial budgeting for exploration phases. Then, it uses average temperature gradient, reservoir temperature estimates, and production capacity to define targets and go/no-go limits. The decision analysis in this approach is based on achieving a minimum IRR at each phase of the project. This secondapproach was determined to be less subjective, since numerical inputs come from the collected data. And it helps to facilitate communication between project managers and exploration geologists in making objective go/no-go decisions throughout the different project phases.« less

  15. Hazardous and Medical Waste Destruction Using the AC Plasmatron Final Report CRADA No. TC-1560-98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Caplan, M.; Bucher, K.; Tulupov, A.

    The goal of this project was to develop a prototype medical waste destruction facility based on the AC plasma torch capable of processing 150 kg of waste per hour while satisfying US EPA emission standards. The project was to provide the first opportunity for a joint U.S.-Russian project using an AC Plasma Torch in a hazardous waste destruction system to be assembled and operated in the U.S. thus promoting the commercialization in the U.S. of this joint U.S.-Russian developed technology. This project was a collaboration between the Russian Institute Soliton- NTT, the U.S industrial partner Scientific Utilization Inc. (SUI) andmore » Lawrence Livermore National Laboratory ( LLNL). The project was funded by DOE for a total of $1.2 million with $600K for allocated for Phase I and $600K for Phase II. The Russian team received about $800K over the two (2) year period while LLNL received $400K. SUI was to provide in kind matching funds totaling $1.2 million.« less

  16. Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs—Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Neil, Lori Ross; Assante, Michael; Tobey, D. H.

    2013-07-01

    This document is a summarization of the report, Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs, the final report for phase 2 of the SPSP (DOE workforce study) project.

  17. REAL-TIME TRACER MONITORING OF RESERVOIR STIMULATION PROCEDURES VIA ELECTRONIC WIRELINE AND TELEMETRY DATA TRANSMISSION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George L. Scott III

    2005-01-01

    Finalized Phase 2-3 project work has field-proven two separate real-time reservoir processes that were co-developed via funding by the National Energy Technology Laboratory (NETL). Both technologies are presently patented in the United States and select foreign markets; a downhole-commingled reservoir stimulation procedure and a real-time tracer-logged fracturing diagnostic system. Phase 2 and early Phase 3 project work included the research, development and well testing of a U.S. patented gamma tracer fracturing diagnostic system. This stimulation logging process was successfully field-demonstrated; real-time tracer measurement of fracture height while fracturing was accomplished and proven technically possible. However, after the initial well tests,more » there were several licensing issues that developed between service providers that restricted and minimized Realtimezone's (RTZ) ability to field-test the real-time gamma diagnostic system as was originally outlined for this project. Said restrictions were encountered after when one major provider agreed to license their gamma logging tools to another. Both of these companies previously promised contributory support toward Realtimezone's DE-FC26-99FT40129 project work, however, actual support was less than desired when newly-licensed wireline gamma logging tools from one company were converted by the other from electric wireline into slickline, batter-powered ''memory'' tools for post-stimulation logging purposes. Unfortunately, the converted post-fracture measurement memory tools have no applications in experimentally monitoring real-time movement of tracers in the reservoir concurrent with the fracturing treatment. RTZ subsequently worked with other tracer gamma-logging tool companies for basic gamma logging services, but with lessened results due to lack of multiple-isotope detection capability. In addition to real-time logging system development and well testing, final Phase 2 and Phase 3 project work included the development of a real-time reservoir stimulation procedure, which was successfully field-demonstrated and is presently patented in the U.S. and select foreign countries, including Venezuela, Brazil and Canada. Said patents are co-owned by RTZ and the National Energy Technology Lab (NETL). In 2002, Realtimezone and the NETL licensed said patents to Halliburton Energy Services (HES). Additional licensing agreements (LA) are anticipated with other service industry companies in 2005. Final Phase 3 work has led to commercial applications of the real-time reservoir stimulation procedure. Four successfully downhole-mixed well tests were conducted with commercially expected production results. The most recent, fourth field test was a downhole-mixed stimulated well completed in June, 2004, which currently produces 11 BOPD with 90 barrels of water per day. Conducted Phase 2 and Phase 3 field-test work to date has resulted in the fine-tuning of a real-time enhanced stimulation system that will significantly increase future petroleum well recoveries in the United States and foreign petroleum fields, both onshore and offshore, and in vertical and horizontal wells.« less

  18. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  19. An Overview of 2014 SBIR Phase 1 and Phase 2 Air-Breathing Propulsion

    NASA Technical Reports Server (NTRS)

    Nguyen, Hung D.; Steele, Gynelle C.; Morris, Jessica R.

    2015-01-01

    NASA's Small Business Innovation Research (SBIR) program focuses on technological innovation by investing in development of innovative concepts and technologies to help NASA mission directorates address critical research needs for Agency programs. This report highlights nine of the innovative SBIR 2014 Phase I and Phase II projects that emphasize one of NASA Glenn Research Center's six core competencies-Air-Breathing Propulsion. The technologies cover a wide spectrum of applications such as development of X-ray computed tomography (CT) imaging method for the measurement of complex 3D ice shapes, phased array techniques for low signal-to-noise ratio wind tunnels, compact kinetic mechanisms for petroleum-derived and alternative aviation fuels, and hybrid electric propulsion systems for a multirotor aircraft. Each featured technology describes an innovation, technical objective, and highlights NASA commercial and industrial applications. This report provides as an opportunity for NASA engineers, researchers, and program managers to learn how NASA SBIR technologies could help their programs and projects, and lead to collaborations and partnerships between the small SBIR companies and NASA that would benefit both.

  20. A Data-Driven Approach to Interactive Visualization of Power Grids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhu, Jun

    Driven by emerging industry standards, electric utilities and grid coordination organizations are eager to seek advanced tools to assist grid operators to perform mission-critical tasks and enable them to make quick and accurate decisions. The emerging field of visual analytics holds tremendous promise for improving the business practices in today’s electric power industry. The conducted investigation, however, has revealed that the existing commercial power grid visualization tools heavily rely on human designers, hindering user’s ability to discover. Additionally, for a large grid, it is very labor-intensive and costly to build and maintain the pre-designed visual displays. This project proposes amore » data-driven approach to overcome the common challenges. The proposed approach relies on developing powerful data manipulation algorithms to create visualizations based on the characteristics of empirically or mathematically derived data. The resulting visual presentations emphasize what the data is rather than how the data should be presented, thus fostering comprehension and discovery. Furthermore, the data-driven approach formulates visualizations on-the-fly. It does not require a visualization design stage, completely eliminating or significantly reducing the cost for building and maintaining visual displays. The research and development (R&D) conducted in this project is mainly divided into two phases. The first phase (Phase I & II) focuses on developing data driven techniques for visualization of power grid and its operation. Various data-driven visualization techniques were investigated, including pattern recognition for auto-generation of one-line diagrams, fuzzy model based rich data visualization for situational awareness, etc. The R&D conducted during the second phase (Phase IIB) focuses on enhancing the prototyped data driven visualization tool based on the gathered requirements and use cases. The goal is to evolve the prototyped tool developed during the first phase into a commercial grade product. We will use one of the identified application areas as an example to demonstrate how research results achieved in this project are successfully utilized to address an emerging industry need. In summary, the data-driven visualization approach developed in this project has proven to be promising for building the next-generation power grid visualization tools. Application of this approach has resulted in a state-of-the-art commercial tool currently being leveraged by more than 60 utility organizations in North America and Europe .« less

  1. Project Northland high school interventions: community action to reduce adolescent alcohol use.

    PubMed

    Perry, C L; Williams, C L; Komro, K A; Veblen-Mortenson, S; Forster, J L; Bernstein-Lachter, R; Pratt, L K; Dudovitz, B; Munson, K A; Farbakhsh, K; Finnegan, J; McGovern, P

    2000-02-01

    Project Northland is a randomized community trial initially implemented in 24 school districts and communities in northeastern Minnesota, with goals of delaying onset and reducing adolescent alcohol use using community-wide, multiyear, multiple interventions. The study targets the Class of 1998 from the 6th to 12th grades (1991-1998). The early adolescent phase of Project Northland has been completed, and reductions in the prevalence of alcohol use at the end of 8th grade were achieved. Phase II of Project Northland, targeting 11th- and 12th-grade students, uses five major strategies: (1) direct action community organizing methods to encourage citizens to reduce underage access to alcohol, (2) youth development involving high school students in youth action teams, (3) print media to support community organizing and youth action initiatives and communicate healthy norms about underage drinking (e.g., providing alcohol to minors is unacceptable), (4) parent education and involvement, and (5) a classroom-based curriculum for 11th-grade students. This article describes the background, design, implementation, and process measures of the intervention strategies for Phase II of Project Northland.

  2. Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

    NASA Technical Reports Server (NTRS)

    Jung, Yoon; Engelland, Shawn; Capps, Richard; Coppenbarger, Rich; Hooey, Becky; Sharma, Shivanjli; Stevens, Lindsay; Verma, Savita; Lohr, Gary; Chevalley, Eric; hide

    2018-01-01

    This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

  3. Final report on the maintenance asset management project : phase I.

    DOT National Transportation Integrated Search

    2012-07-01

    This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT res...

  4. New Whole-House Solutions Case Study: Northwest Energy Efficient Manufactured Housing Program High-Performance Test Homes - Pacific Northwest

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-05-01

    This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measuresmore » from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.« less

  5. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gasper, John R.; Veselka, Thomas D.; Mahalik, Matthew R.

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in moremore » energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.« less

  6. Investigation of contributing factors regarding wrong-way driving on freeways, phase II.

    DOT National Transportation Integrated Search

    2015-09-01

    In the second phase of this project, two major tasks were completed: (1) organizing a national wrong-way driving : (WWD) summit and (2) developing guidelines for reducing WWD on freeways. The first national WWD summit was : held in Edwardsville, Illi...

  7. Development of non-petroleum-based binders for use in flexible pavements - phase II.

    DOT National Transportation Integrated Search

    2015-10-01

    Bio-binders can be utilized as asphalt modifiers, extenders, and replacements for conventional asphalt in bituminous binders. : From the rheology results of Phase I of this project, it was found that the bio-binders tested had good performance, simil...

  8. Load rating and FRP retrofitting of bridge abutment timber piles.

    DOT National Transportation Integrated Search

    2016-05-01

    This report details Phase II of the study titled Strengthening of Bridge Wood Piling Retrofits for Moment Resistance. Phase I of the research (project : R27-082) was focused on developing a load rating method for timber piles under eccentric load and...

  9. NASA Project Develops Next-Generation Low-Emissions Combustor Technologies

    NASA Technical Reports Server (NTRS)

    Lee, Chi-Ming; Chang, Clarence T.; Herbon, John T.; Kramer, Stephen K.

    2013-01-01

    NASA's Environmentally Responsible Aviation (ERA) Project is working with industry to develop the fuel flexible combustor technologies for a new generation of low-emissions engine targeted for the 2020 timeframe. These new combustors will reduce nitrogen oxide (NOx) emissions to half of current state-of-the-art (SOA) combustors, while simultaneously reducing noise and fuel burn. The purpose of the low NOx fuel-flexible combustor research is to advance the Technology Readiness Level (TRL) and Integration Readiness Level (IRL) of a low NOx, fuel flexible combustor to the point where it can be integrated in the next generation of aircraft. To reduce project risk and optimize research benefit NASA chose to found two Phase 1 contracts. The first Phase 1 contracts went to engine manufactures and were awarded to: General Electric Company, and Pratt & Whitney Company. The second Phase 1 contracts went to fuel injector manufactures Goodrich Corporation, Parker Hannifin Corporation, and Woodward Fuel System Technology. In 2012, two sector combustors were tested at NASA's ASCR. The results indicated 75% NOx emission reduction below the 2004 CAEP/6 regulation level.

  10. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less

  11. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  12. Installation Restoration Program Records Search for Westover Air Force Base, Massachusetts.

    DTIC Science & Technology

    1982-04-01

    Phase III (not part of this contract) consists of a technology base development study to support the development of project plans for controlling...determine the extent and magnitude of the contaminant migration. Phase III (not part of this contract) consists of a technology base development study to...number of vegetation studies have attempted to classify the potential climax vegetation within the region of Westover AFB (Braun, 1972; Kuchler, 1975

  13. Supporting Indigenous Students' Understanding of the Numeration System of Their First Language

    ERIC Educational Resources Information Center

    Cortina, Jose Luis

    2013-01-01

    Results from a project conducted in Mexico are discussed, in which a group of 17 indigenous teachers analyzed the numeration systems of their first language. The main goal of the project is to develop resources that help teachers in supporting students' understanding of the systems. In the first phase of the project, the central organizing ideas…

  14. Evaluating Introductory Physics Classes in Light of the ABET Criteria: An Example from the SCALE-UP Project.

    ERIC Educational Resources Information Center

    Saul, Jeffery M.; Deardorff, Duane L.; Abbott, David S.; Allain, Rhett J.; Beichner, Robert J.

    The Student-Centered Activities for Large Enrollment University Physics (SCALE-UP) project at North Carolina State University (NCSU) is developing a curriculum to promote learning through in-class group activities in introductory physics classes up to 100 students. The authors are currently in Phase II of the project using a specially designed…

  15. The ENCODE Project at UC Santa Cruz.

    PubMed

    Thomas, Daryl J; Rosenbloom, Kate R; Clawson, Hiram; Hinrichs, Angie S; Trumbower, Heather; Raney, Brian J; Karolchik, Donna; Barber, Galt P; Harte, Rachel A; Hillman-Jackson, Jennifer; Kuhn, Robert M; Rhead, Brooke L; Smith, Kayla E; Thakkapallayil, Archana; Zweig, Ann S; Haussler, David; Kent, W James

    2007-01-01

    The goal of the Encyclopedia Of DNA Elements (ENCODE) Project is to identify all functional elements in the human genome. The pilot phase is for comparison of existing methods and for the development of new methods to rigorously analyze a defined 1% of the human genome sequence. Experimental datasets are focused on the origin of replication, DNase I hypersensitivity, chromatin immunoprecipitation, promoter function, gene structure, pseudogenes, non-protein-coding RNAs, transcribed RNAs, multiple sequence alignment and evolutionarily constrained elements. The ENCODE project at UCSC website (http://genome.ucsc.edu/ENCODE) is the primary portal for the sequence-based data produced as part of the ENCODE project. In the pilot phase of the project, over 30 labs provided experimental results for a total of 56 browser tracks supported by 385 database tables. The site provides researchers with a number of tools that allow them to visualize and analyze the data as well as download data for local analyses. This paper describes the portal to the data, highlights the data that has been made available, and presents the tools that have been developed within the ENCODE project. Access to the data and types of interactive analysis that are possible are illustrated through supplemental examples.

  16. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  17. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  18. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  19. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  20. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  1. Lessons learned in the transition to ADA from FORTRAN at NASA/Goddard. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Brophy, Carolyn Elizabeth

    1989-01-01

    A case study was done at Goddard Space Flight Center, in which two dynamics satellite simulators are developed from the same requirements, one in Ada and the other in FORTRAN. The purpose of the research was to find out how well the prescriptive Ada development model worked to develop the Ada simulator. The FORTRAN simulator development, as well as past FORTRAN developments, provided a baseline for comparison. Since this was the first simulator developed here, the prescriptive Ada development model had many similarities to the usual FORTRAN development model. However, it was modified to include longer design and shorter testing phases, which is generally expected with Ada development. One surprising result was that the percentage of time the Ada project spent in the various development activities was very similar to the percentage of time spent in these activities when doing a FORTRAN project. Another surprising finding was the difficulty the Ada team had with unit testing as well as with integration. In retrospect it is realized that adding additional steps to the design phase, such as an abstract data type analysis, and certain guidelines to the implementation phase, such as to use primarily library units and nest sparingly, would have made development much easier.

  2. Astronomy sortie missions definition study. Volume 4: Program development requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Program development requirements for the selected Astronomy Sortie Missions concept were generated and are presented in four parts as follows: (1)the gross planning requirements that must be considered in subsequent phases of the project; (2)the schedules and logic networks for the design, development, and operation of the overall project; (3)the supporting research and technology required to support the project; and (4)the work breakdown data, from which cost data will be generated. Data reported in each part includes the appropriate rationale with explanations of the guidelines and assumptions that were used in the analyses and estimates.

  3. Interrelationships Among Curriculum and Instruction Variables and Learning Outcomes in Project P.E.A.C.E.

    ERIC Educational Resources Information Center

    Bennett, Roger V.

    The paper focuses on development and implementation of the curriculum phase of an urban environmental studies program entitled Project Environmental Action Community Education (P.E.A.C.E.) The curriculum model developed for P.E.A.C.E. was based on the premises that it should be created by relevant consumer groups as well as educators,…

  4. DEVELOPING A THEORY OF EDUCATIONAL PRACTICE FOR THE ELEMENTARY SCHOOL. PROJECT REPORT TO THE FORD FOUNDATION FUND FOR THE ADVANCEMENT OF EDUCATION.

    ERIC Educational Resources Information Center

    KAYA, ESIN; AND OTHERS

    A TWO-YEAR COOPERATIVE RESEARCH PROJECT (1965-1967) WAS CONDUCTED TO SYNTHESIZE THE BODY OF AVAILABLE EMPIRICAL KNOWLEDGE RELATED TO EDUCATIONAL PRACTICE IN A MANNER TYPICAL OF SCIENTIFIC THEORY CONSTRUCTION AND TO DEVELOP A DICTIONARY OF OVER 600 COMMON EDUCATIONAL TERMS OPERATIONALLY DEFINED IN AN APPENDED GLOSSARY. THE THREE MAIN PHASES OF THE…

  5. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: KDP-A for Phase 2 Minimum Operational Performance Standards

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Hackenberg, Davis L.

    2016-01-01

    UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.

  6. Micron Accuracy Deployment Experiment (MADE), phase A. Volume 1

    NASA Technical Reports Server (NTRS)

    Peterson, Lee D.; Lake, Mark S.

    1995-01-01

    This report documents a Phase A In-STEP flight experiment development effort. The objective of the experiment is to deploy a portion of a segmented reflector on the Shuttle and study its micron-level mechanics. Ground test data are presented which projects that the on-orbit precision of the test article should be approximately 5 microns. Extensive hardware configuration development information is also provided.

  7. Advanced Percussive Drilling Technology for Geothermal Exploration and Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Su, Jiann; Raymond, David; Prasad, Somuri

    Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phasemore » I and evaluating performance of the materials and designs at high operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for use in the driller’s toolbox.« less

  8. Guidance, Navigation and Control (GN&C): Best Practices for Human-Rated Spacecraft Systems

    NASA Technical Reports Server (NTRS)

    Lebsock, Ken; West, John

    2008-01-01

    In 2007 the NESC completed an in-depth assessment to identify, define and document engineering considerations for the Design Development Test and Evaluation (DDT&E) of human-rated spacecraft systems. This study had been requested by the Astronaut Office at JSC to help them to better understand what is required to ensure safe, robust, and reliable human-rated spacecraft systems. The 22 GN&C engineering Best Practices described in this paper are a condensed version of what appears in the NESC Technical Report. These Best Practices cover a broad range from fundamental system architectural considerations to more specific aspects (e.g., stability margin recommendations) of GN&C system design and development. 15 of the Best Practices address the early phases of a GN&C System development project and the remaining 7 deal with the later phases. Some of these Best Practices will cross-over between both phases. We recognize that this set of GN&C Best Practices will not be universally applicable to all projects and mission applications.

  9. Creating Entrustable Professional Activities to Assess Internal Medicine Residents in Training: A Mixed-Methods Approach.

    PubMed

    Taylor, David R; Park, Yoon Soo; Smith, Christopher A; Karpinski, Jolanta; Coke, William; Tekian, Ara

    2018-05-15

    Competency-based medical education has not advanced residency training as much as many observers expected. Some medical educators now advocate reorienting competency-based approaches to focus on a resident's ability to do authentic clinical work. To develop descriptions of clinical work for which internal medicine residents must gain proficiency to deliver meaningful patient care (for example, "Admit and manage a medical inpatient with a new acute problem"). A modified Delphi process involving clinical experts followed by a conference of educational experts. The Royal College of Physicians and Surgeons of Canada. In phase 1 of the project, members of the Specialty Committee for Internal Medicine participated in a modified Delphi process to identify activities in internal medicine that represent the scope of the specialty. In phase 2 of the project, 5 experts who were scholars and leaders in competency-based medical education reviewed the results. Phase 1 identified important activities, revised descriptions to improve accuracy and avoid overlap, and assigned activities to stages of training. Phase 2 compared proposed activity descriptions with published guidelines for their development and application in medical education. The project identified 29 activities that qualify as entrustable professional activities. The project also produced a detailed description of each activity and guidelines for using them to assess residents. These activities reflect the practice patterns of the developers and may not fully represent internal medicine practice in Canada. Identification of these activities is expected to facilitate modification of training and assessment programs for medical residents so that programs focus less on isolated skills and more on integrated tasks. Southeastern Ontario Academic Medical Organization Endowed Scholarship and Education Fund and Queen's University Department of Medicine Innovation Fund.

  10. The WAMI Rural Hospital Project. Part 3: Building health care leadership in rural communities.

    PubMed

    Elder, W G; Amundson, B A

    1991-01-01

    The WAMI Rural Hospital Project (RHP) intervention combined aspects of community development, strategic planning and organizational development to address the leadership issues in six Northwest rural hospitals. Hospitals and physicians, other community health care providers and local townspeople were involved in this intervention, which was accomplished in three phases. In the first phase, extensive information about organizational effectiveness was collected at each site. Phase two consisted of 30 hours of education for the physician, board, and hospital administrator community representatives covering management, hospital board governance, and scope of service planning. In the third phase, each community worked with a facilitator to complete a strategic plan and to resolve conflicts addressed in the management analyses. The results of the evaluation demonstrated that the greatest change noted among RHP hospitals was improvement in the effectiveness of their governing boards. All boards adopted some or all of the project's model governance plan and had successfully completed considerable portions of their strategic plans by 1989. Teamwork among the management triad (hospital, board, and medical staff) was also substantially improved. Other improvements included the development of marketing plans for the three hospitals that did not initially have them and more effective use of outside consultants. The project had less impact on improving the functioning of the medical chief of staff, although this was not a primary target of the intervention. There was also relatively less community interest in joining regional health care associations. The authors conclude that an intervention program tailored to address specific community needs and clearly identified leadership deficiencies can have a positive effect on rural health care systems.

  11. Accelerating the introduction of HTS products for a broad range of electric power and industrial applications

    NASA Astrophysics Data System (ADS)

    Eaton, Russell

    2002-01-01

    The Department of Energy (DOE), as part of its Superconductivity Program for Electric Systems, is successfully pursuing the development of electric power and industrial devices, incorporating significant high-temperature superconducting (HTS) components or subsystems, through its innovative Superconducting Partnership Initiative (SPI). The objective of the SPI is to accelerate the commercial introduction of the HTS products for a broad range of electric power and industrial applications. DOE's approach to accomplishing the SPI objective is to support cost shared projects carried out by industry led teams. DOE will fund projects to develop HTS devices that are either in (1) the research and development stage (Phase 1), (2) the pre-commercialization stage (Phase II), or (3) the commercial entry stage (Phase III). DOE's industry partners must contribute at least half a project's costs. These teams will include capabilities needed to develop the device as well as to develop the business plan for the commercial product introduction. DOE's partners consist of vertically integrated teams consisting of equipment manufacturers, HTS wire and coil suppliers, national laboratories, and end users, primarily utilities. These partners carry out the multi-year technology development efforts, consisting generally of design, construction, and testing of the HTS system. Finally, commercialization of HTS products will be discussed primarily in terms of benefits these products will have over competing products based upon conventional conductors and the critical need for affordable, practical HTS materials and conductors for these applications. .

  12. DEVELOPMENT OF APPAREL AND FOOTWEAR FROM RENEWABLE SOURCES (PHASE II)

    EPA Science Inventory

    At the end of this project, we will have the demonstration package including samples of all the bio-based renewable materials used in the design, the apparel and footwear prototypes, and the evaluation results. This project will be integrated into required textiles course for ...

  13. NASA/Air Force Cost Model: NAFCOM

    NASA Technical Reports Server (NTRS)

    Winn, Sharon D.; Hamcher, John W. (Technical Monitor)

    2002-01-01

    The NASA/Air Force Cost Model (NAFCOM) is a parametric estimating tool for space hardware. It is based on historical NASA and Air Force space projects and is primarily used in the very early phases of a development project. NAFCOM can be used at the subsystem or component levels.

  14. Postcode Criminals

    ERIC Educational Resources Information Center

    Hiett, Sandra; Kushner, Joann

    2013-01-01

    Postcode Criminals was the second phase of an international participatory community arts project challenging negative stereotypes of urban youth. Concerned with the impact of zero tolerance community policing strategies in the UK and USA, artists Joann Kushner and Dread Scott developed an art-based project with a social justice agenda. To give…

  15. Occupant Protection Project

    NASA Technical Reports Server (NTRS)

    Bopp, Genie; Somers, Jeff; Granderson, Brad; Gernhardt, Mike; Currie, Nancy; Lawrence, Chuck

    2010-01-01

    Topics include occupant protection overview with a focus on crew protection during dynamic phases of flight; occupant protection collaboration; modeling occupant protection; occupant protection considerations; project approach encompassing analysis tools, injury criteria, and testing program development; injury criteria update methodology, unique effects of pressure suits and other factors; and a summary.

  16. Safety factor increase to fatigue limit states through shear spiking for timber railroad bridge rehabilitation - phase I.

    DOT National Transportation Integrated Search

    2014-11-01

    The overall project is to demonstrate the effectiveness of shear spiking (technique alrea : dy developed : through a previous project). Many timber railroad bridges are deficient but i : t is too costly to replace them; : hence : , : inexpensive repa...

  17. IPRT polarized radiative transfer model intercomparison project - Phase A

    NASA Astrophysics Data System (ADS)

    Emde, Claudia; Barlakas, Vasileios; Cornet, Céline; Evans, Frank; Korkin, Sergey; Ota, Yoshifumi; Labonnote, Laurent C.; Lyapustin, Alexei; Macke, Andreas; Mayer, Bernhard; Wendisch, Manfred

    2015-10-01

    The polarization state of electromagnetic radiation scattered by atmospheric particles such as aerosols, cloud droplets, or ice crystals contains much more information about the optical and microphysical properties than the total intensity alone. For this reason an increasing number of polarimetric observations are performed from space, from the ground and from aircraft. Polarized radiative transfer models are required to interpret and analyse these measurements and to develop retrieval algorithms exploiting polarimetric observations. In the last years a large number of new codes have been developed, mostly for specific applications. Benchmark results are available for specific cases, but not for more sophisticated scenarios including polarized surface reflection and multi-layer atmospheres. The International Polarized Radiative Transfer (IPRT) working group of the International Radiation Commission (IRC) has initiated a model intercomparison project in order to fill this gap. This paper presents the results of the first phase A of the IPRT project which includes ten test cases, from simple setups with only one layer and Rayleigh scattering to rather sophisticated setups with a cloud embedded in a standard atmosphere above an ocean surface. All scenarios in the first phase A of the intercomparison project are for a one-dimensional plane-parallel model geometry. The commonly established benchmark results are available at the IPRT website.

  18. UWR/MSAA demonstration of coordinated human-services transportation models - phase II : phased implementation.

    DOT National Transportation Integrated Search

    2012-12-01

    This report presents the results of a 16-month project for system development and design of a model for a Travel Management Coordination Center (TMCC) using ITS capabilities. The system was designed as a tool to facilitate the exchange of knowledge a...

  19. Reviewing Teamwork Activities.

    ERIC Educational Resources Information Center

    Larcher, Bob

    2001-01-01

    When working on tasks or projects, teams typically go through four phases: initiation, creation, elaboration, and completion. Each phase is explained, and two examples illustrate how the model is used after an orienteering exercise to help corporate management teams understand their way of functioning and identify strengths and development points.…

  20. Evaluation of an action research project in ophthalmic nursing practice.

    PubMed

    Waterman, Heather; Harker, Rona; MacDonald, Heather; McLaughlan, Rita; Waterman, Christine

    2005-11-01

    This paper reports the evaluation phase of an action research project that promoted face-down posturing of patients following vitreo-retinal surgery for macular hole to enhance patient outcomes. The evaluation phase identified areas of practice needing further development from the perspectives of those involved with the care of patients. To achieve best results following surgical repair of macular hole, patients are required to posture face down for several weeks. As a consequence, patients complain of severe back and neck ache and find it difficult to persist with the posturing. Work to advance nursing practice as surgical developments occur has relevance beyond ophthalmology and the particular context of this project. The first three phases of this action research--problem identification, planning and action--have been reported in another paper. Throughout the project an action research group comprising of representatives of key stakeholders were actively involved in researching and changing practice. During the evaluation phase, a qualitative methodology was chosen. Interviews with 17 members of staff from the inpatient area were carried out to elicit their perspectives on the posturing of patients. Qualitative interviews were selected to facilitate comparison with interview data from Phase 1. Data analysis ran concurrently with data collection, so that one could inform the other. Overall, nurses and healthcare support workers felt that patients were more agreeable to posturing and after surgery began to posture more quickly. Communication was still an issue in some instances, and patients having urgent as opposed to planned surgery were found to be more difficult to prepare and the psychological care of patients still posed problems for nursing staff. The evaluation suggests that improvements in the care of this group of patients have occurred. A 10-point plan to promote face-down posturing has been developed which will be of use to practitioners in other settings. Some aspects of practice remain less well-understood, for example, the psychological care of patients.

  1. Review of NASA's Hypersonic Research Engine Project

    NASA Technical Reports Server (NTRS)

    Andrews, Earl H.; Mackley, Ernest A.

    1993-01-01

    The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.

  2. Development of Geography and Geology Terminology in British Sign Language

    NASA Astrophysics Data System (ADS)

    Meara, Rhian; Cameron, Audrey; Quinn, Gary; O'Neill, Rachel

    2016-04-01

    The BSL Glossary Project, run by the Scottish Sensory Centre at the University of Edinburgh focuses on developing scientific terminology in British Sign Language for use in the primary, secondary and tertiary education of deaf and hard of hearing students within the UK. Thus far, the project has developed 850 new signs and definitions covering Chemistry, Physics, Biology, Astronomy and Mathematics. The project has also translated examinations into BSL for students across Scotland. The current phase of the project has focused on developing terminology for Geography and Geology subjects. More than 189 new signs have been developed in these subjects including weather, rivers, maps, natural hazards and Geographical Information Systems. The signs were developed by a focus group with expertise in Geography and Geology, Chemistry, Ecology, BSL Linguistics and Deaf Education all of whom are deaf fluent BSL users.

  3. Time management displays for shuttle countdown

    NASA Technical Reports Server (NTRS)

    Beller, Arthur E.; Hadaller, H. Greg; Ricci, Mark J.

    1992-01-01

    The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.

  4. Phase I Final Scientific Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Xijia; Fetvedt, Jeremy; Dimmig, Walker

    This Final Scientific Report addresses the accomplishments achieved during Phase I of DE- FE0023985, Coal Syngas Combustor Development for Supercritical CO 2 Power Cycles. The primary objective of the project was to develop a coal syngas-fueled combustor design for use with high-pressure, high-temperature, oxy-fuel, supercritical CO 2 power cycles, with particular focus given to the conditions required by the Allam Cycle. The primary goals, from the Statement of Project Objectives, were to develop: (1) a conceptual design of a syngas-fueled combustor-turbine block for a 300MWe high-pressure, oxy-fuel, sCO2 power plant; (2) the preliminary design of a 5MWt test combustor; andmore » (3) the definition of a combustor test program. Accomplishments for each of these goals are discussed in this report.« less

  5. Closure development for high-level nuclear waste containers for the tuff repository; Phase 1, Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robitz, E.S. Jr.; McAninch, M.D. Jr.; Edmonds, D.P.

    1990-09-01

    This report summarizes Phase 1 activities for closure development of the high-level nuclear waste package task for the tuff repository. Work was conducted under U.S. Department of Energy (DOE) Contract 9172105, administered through the Lawrence Livermore National Laboratory (LLNL), as part of the Yucca Mountain Project (YMP), funded through the DOE Office of Civilian Radioactive Waste Management (OCRWM). The goal of this phase was to select five closure processes for further evaluation in later phases of the program. A decision tree methodology was utilized to perform an objective evaluation of 15 potential closure processes. Information was gathered via a literaturemore » survey, industrial contacts, and discussions with project team members, other experts in the field, and the LLNL waste package task staff. The five processes selected were friction welding, electron beam welding, laser beam welding, gas tungsten arc welding, and plasma arc welding. These are felt to represent the best combination of weldment material properties and process performance in a remote, radioactive environment. Conceptual designs have been generated for these processes to illustrate how they would be implemented in practice. Homopolar resistance welding was included in the Phase 1 analysis, and developments in this process will be monitored via literature in Phases 2 and 3. Work was conducted in accordance with the YMP Quality Assurance Program. 223 refs., 20 figs., 9 tabs.« less

  6. Magnetometer instrument team studies for the definition phase of the outer planets grand tour

    NASA Technical Reports Server (NTRS)

    Coleman, P. J., Jr.

    1972-01-01

    The objectives of magnetic field investigations on missions to the outer planets were defined as well as an instrumentation system, a program of studies and instrument development tasks was proposed for the mission definition phase of the Outer Planets Grand Tour project. A report on the status of this program is given. Requirements were also established for the spacecraft and the mission which would insure their compatibility with the magnetic field investigation proposed for the outer planets missions and developed figures of merit for encounter trajectories. The spacecraft-instrumentation interface and the on-board data handling system were defined in various reports by the Project Team and in the reports by the Science Steering Group. The defining program for exploring the outer planets within the more restrictive constraints of the Mariner Jupiter-Saturn project included defining a limited magnetic field investigation.

  7. The development of a program analysis environment for Ada

    NASA Technical Reports Server (NTRS)

    Brown, David B.; Carlisle, Homer W.; Chang, Kai-Hsiung; Cross, James H.; Deason, William H.; Haga, Kevin D.; Huggins, John R.; Keleher, William R. A.; Starke, Benjamin B.; Weyrich, Orville R.

    1989-01-01

    A unit level, Ada software module testing system, called Query Utility Environment for Software Testing of Ada (QUEST/Ada), is described. The project calls for the design and development of a prototype system. QUEST/Ada design began with a definition of the overall system structure and a description of component dependencies. The project team was divided into three groups to resolve the preliminary designs of the parser/scanner: the test data generator, and the test coverage analyzer. The Phase 1 report is a working document from which the system documentation will evolve. It provides history, a guide to report sections, a literature review, the definition of the system structure and high level interfaces, descriptions of the prototype scope, the three major components, and the plan for the remainder of the project. The appendices include specifications, statistics, two papers derived from the current research, a preliminary users' manual, and the proposal and work plan for Phase 2.

  8. Knowledge-based decision support for Space Station assembly sequence planning

    NASA Astrophysics Data System (ADS)

    1991-04-01

    A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

  9. Knowledge-based decision support for Space Station assembly sequence planning

    NASA Technical Reports Server (NTRS)

    1991-01-01

    A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

  10. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2010-01-01

    NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several sub-elements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles' thermal control system. NASA's Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

  11. Demonstration of improved vehicle fuel efficiency through innovative tire design, materials, and weight reduction technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donley, Tim

    2014-12-31

    Cooper completed an investigation into new tire technology using a novel approach to develop and demonstrate a new class of fuel efficient tires using innovative materials technology and tire design concepts. The objective of this work was to develop a new class of fuel efficient tires, focused on the “replacement market” that would improve overall passenger vehicle fuel efficiency by 3% while lowering the overall tire weight by 20%. A further goal of this project was to accomplish the objectives while maintaining the traction and wear performance of the control tire. This program was designed to build on what hasmore » already been accomplished in the tire industry for rolling resistance based on the knowledge and general principles developed over the past decades. Cooper’s CS4 (Figure #1) premium broadline tire was chosen as the control tire for this program. For Cooper to achieve the goals of this project, the development of multiple technologies was necessary. Six technologies were chosen that are not currently being used in the tire industry at any significant level, but that showed excellent prospects in preliminary research. This development was divided into two phases. Phase I investigated six different technologies as individual components. Phase II then took a holistic approach by combining all the technologies that showed positive results during phase one development.« less

  12. Computational Design and Discovery of Ni-Based Alloys and Coatings: Thermodynamic Approaches Validated by Experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Zi-Kui; Gleeson, Brian; Shang, Shunli

    This project developed computational tools that can complement and support experimental efforts in order to enable discovery and more efficient development of Ni-base structural materials and coatings. The project goal was reached through an integrated computation-predictive and experimental-validation approach, including first-principles calculations, thermodynamic CALPHAD (CALculation of PHAse Diagram), and experimental investigations on compositions relevant to Ni-base superalloys and coatings in terms of oxide layer growth and microstructure stabilities. The developed description included composition ranges typical for coating alloys and, hence, allow for prediction of thermodynamic properties for these material systems. The calculation of phase compositions, phase fraction, and phase stabilities,more » which are directly related to properties such as ductility and strength, was a valuable contribution, along with the collection of computational tools that are required to meet the increasing demands for strong, ductile and environmentally-protective coatings. Specifically, a suitable thermodynamic description for the Ni-Al-Cr-Co-Si-Hf-Y system was developed for bulk alloy and coating compositions. Experiments were performed to validate and refine the thermodynamics from the CALPHAD modeling approach. Additionally, alloys produced using predictions from the current computational models were studied in terms of their oxidation performance. Finally, results obtained from experiments aided in the development of a thermodynamic modeling automation tool called ESPEI/pycalphad - for more rapid discovery and development of new materials.« less

  13. GEWEX Cloud System Study (GCSS) Working Group on Cirrus Cloud Systems (WG2)

    NASA Technical Reports Server (NTRS)

    Starr, David

    2002-01-01

    Status, progress and plans will be given for current GCSS (GEWEX Cloud System Study) WG2 (Working Group on Cirrus Cloud Systems) projects, including: (a) the Idealized Cirrus Model Comparison Project, (b) the Cirrus Parcel Model Comparison Project (Phase 2), and (c) the developing Hurricane Nora extended outflow model case study project. Past results will be summarized and plans for the upcoming year described. Issues and strategies will be discussed. Prospects for developing improved cloud parameterizations derived from results of GCSS WG2 projects will be assessed. Plans for NASA's CRYSTAL-FACE (Cirrus Regional Study of Tropical Anvils and Layers - Florida Area Cirrus Experiment) potential opportunities for use of those data for WG2 model simulations (future projects) will be briefly described.

  14. Development and Test of Robotically Assisted Extravehicular Activity Gloves

    NASA Technical Reports Server (NTRS)

    Rogers, Jonathan M.; Peters, Benjamin J.; Laske, Evan A.; McBryan, Emily R.

    2017-01-01

    Over the past two years, the High Performance EVA Glove (HPEG) project under NASA's Space Technology Mission Directorate (STMD) funded an effort to develop an electromechanically-assisted space suit glove. The project was a collaboration between the Johnson Space Center's Software, Robotics, and Simulation Division and the Crew and Thermal Systems division. The project sought to combine finger actuator technology developed for Robonaut 2 with the softgoods from the ILC Phase VI EVA glove. The Space Suit RoboGlove (SSRG) uses a system of three linear actuators to pull synthetic tendons attached to the glove's fingers to augment flexion of the user's fingers. To detect the user's inputs, the system utilizes a combination of string potentiometers along the back of the fingers and force sensitive resistors integrated into the fingertips of the glove cover layer. This paper discusses the development process from initial concepts through two major phases of prototypes, and the results of initial human testing. Initial work on the project focused on creating a functioning proof of concept, designing the softgoods integration, and demonstrating augmented grip strength with the actuators. The second year of the project focused on upgrading the actuators, sensors, and software with the overall goal of creating a system that moves with the user's fingers in order to reduce fatigue associated with the operation of a pressurized glove system. This paper also discusses considerations for a flight system based on this prototype development and address where further work is required to mature the technology.

  15. VESTA Project: Phase 0 report

    NASA Technical Reports Server (NTRS)

    Perret, A.

    1986-01-01

    This report presents the results of technical studies conducted at CNES/PMF/APS between October 1984 and September 1985 on the VESTA project. These preliminary studies were conducted to establish mission feasibility in terms ofthe trajectory and the scientific objectives, and to determine the type of interfaces which will be required with the Soviets and to measure the magnitude of French participation. A joint French-Soviet report recommends that the project enter phase A, and was approved by CNES and INTERCOSMOS in September, 1985. The mission analysis is made for a mid-1991 launch, and a development schedule for an end-1992 launch is suggested. The decision to postpone the mission was made during the course of the study.

  16. Global environment facility: Independent evaluation of the pilot phase; Fonds pour l`environnement mondial: evaluation independante de la phase pilote

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    This study responds to a request by participants in the Global Environment Facility (GEF) for an independent evaluation of the pilot phase. It profiles the GEF, discusses its policy framework, and reviews project development procedures and the strategies and projects in each of the GEF`s four focal areas. The study concludes that fundamental changes must occur and recommends specific reforms, such as articulating more clearly the GEF`s mandate, objectives, and strategies; addressing deficiencies in meeting its global focus; improving capacities and procedures within implementing agencies for managing the portfolio; and increasing non-government organization (NGO), country and community-level participation.

  17. Resource management and operations in central North Dakota: Climate change scenario planning workshop summary November 12-13, 2015, Bismarck, ND

    USGS Publications Warehouse

    Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika

    2016-01-01

    The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.

  18. Resource management and operations in southwest South Dakota: Climate change scenario planning workshop summary January 20-21, 2016, Rapid City, SD

    USGS Publications Warehouse

    Fisichelli, Nicholas A.; Schuurman, Gregor W.; Symstad, Amy J.; Ray, Andrea; Miller, Brian; Cross, Molly; Rowland, Erika

    2016-01-01

    The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the southwest South Dakota grasslands focal area, with an emphasis on Badlands National Park and Buffalo Gap National Grassland. The report explains scenario planning as an adaptation tool in general, then describes how it was applied to the focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held January 20-21, 2016 in Rapid City, South Dakota, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.

  19. Evaluation of expansion algorithm of measurement range suited for 3D shape measurement using two pitches of projected grating with light source-stepping method

    NASA Astrophysics Data System (ADS)

    Sakaguchi, Toshimasa; Fujigaki, Motoharu; Murata, Yorinobu

    2015-03-01

    Accurate and wide-range shape measurement method is required in industrial field. The same technique is possible to be used for a shape measurement of a human body for the garment industry. Compact 3D shape measurement equipment is also required for embedding in the inspection system. A shape measurement by a phase shifting method can measure the shape with high spatial resolution because the coordinates can be obtained pixel by pixel. A key-device to develop compact equipment is a grating projector. Authors developed a linear LED projector and proposed a light source stepping method (LSSM) using the linear LED projector. The shape measurement euipment can be produced with low-cost and compact without any phase-shifting mechanical systems by using this method. Also it enables us to measure 3D shape in very short time by switching the light sources quickly. A phase unwrapping method is necessary to widen the measurement range with constant accuracy for phase shifting method. A general phase unwrapping method with difference grating pitches is often used. It is one of a simple phase unwrapping method. It is, however, difficult to apply the conventional phase unwrapping algorithm to the LSSM. Authors, therefore, developed an expansion unwrapping algorithm for the LSSM. In this paper, an expansion algorithm of measurement range suited for 3D shape measurement using two pitches of projected grating with the LSSM was evaluated.

  20. The Family Learning Project - Phase I. Project Report.

    ERIC Educational Resources Information Center

    Heffner, Elaine; Platt, Elizabeth Balliett

    Written to meet four objectives, this document (1) reviews the use of media in parent education, (2) evaluates the format and content of existing approaches, (3) formulates a philosophy to guide the development of new materials, and (4) makes specific recommendations regarding future parent education materials. Specific recommendations concerning…

  1. Life Sciences Centrifuge Facility review

    NASA Technical Reports Server (NTRS)

    Young, Laurence R.

    1994-01-01

    The Centrifuge Facility Project at ARC was reviewed by a code U team to determine appropriateness adequacy for the ISSA. This report represents the findings of one consultant to this team and concentrates on scientific and technical risks. This report supports continuation of the project to the next phase of development.

  2. Phase II: Final Report. Northern New Mexico Energy Education Project.

    ERIC Educational Resources Information Center

    New Mexico Highlands Univ., Las Vegas.

    Objectives of the Northern New Mexico Energy Education Project were to: (1) improve teachers' knowledge of energy-related subject matter and energy-related educational materials; (2) develop continuing communication and cooperation between elementary and junior high staffs and the university on energy-related matters; and (3) provide follow-up…

  3. Recognizing Risk-of-Failure in Communication Design Projects

    ERIC Educational Resources Information Center

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  4. ECO-WALL SYSTEMS: USING RECYCLED MATERIAL IN THE DESIGN OF COMMERCIAL INTERIOR WALL SYSTEMS FOR BUILDINGS

    EPA Science Inventory

    This proposal describes an interdisciplinary project involving students from several academic departments at Miami University in the design of commercial wall systems to be manufactured from recycled materials. The goal of Phase I of the project is to develop and conduct prelimi...

  5. Factors Affecting Intervention Fidelity of Differentiated Instruction in Kindergarten

    ERIC Educational Resources Information Center

    Dijkstra, Elma M.; Walraven, Amber; Mooij, Ton; Kirschner, Paul A.

    2017-01-01

    This paper reports on the findings in the first phase of a design-based research project as part of a large-scale intervention study in Dutch kindergartens. The project aims at enhancing differentiated instruction and evaluating its effects on children's development, in particular high-ability children. This study investigates relevant…

  6. Vocational Cooking Class. Final Report.

    ERIC Educational Resources Information Center

    Morton, Kathy M.

    A project was conducted to develop a course in cooking skills for high school students interested in preparing for jobs or seeking advanced vocational training in the food service occupations. During the first phase of the project, the course instructor, who is also the head cook at the high school, completed courses in cardiopulmonary…

  7. Development of uniform sections for pavement management system inventory and application : interim report.

    DOT National Transportation Integrated Search

    2007-12-01

    This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system (PMS). Results of ...

  8. The Ocean Food and Energy Farm Project

    ERIC Educational Resources Information Center

    Wilcox, Howard A.

    1976-01-01

    This three-phase, 15-year project is designed to explore and develop the ability to raise the grant California kelp and other marine organisms for food, fuels, fertilizers and plastics in the temperate and tropical oceans. The needed technology is established, but the economic feasibility is yet to be determined. (BT)

  9. Concentrating Solar Power Projects - Supcon Solar Project | Concentrating

    Science.gov Websites

    the grid in July 2013. The second phase is currently under development. Status Date: September 26 Status: Under construction Do you have more information, corrections, or comments? Background Technology : Power tower Status: Under construction Country: China City: Delingha Region: Qinghai Lat/Long Location

  10. Beyond Preservation: New Directions for Technological Innovation through Intangible Cultural Heritage

    ERIC Educational Resources Information Center

    Robbins, Christopher

    2010-01-01

    While many digitization projects are currently underway, to help preserve Indigenous traditions, few explore the full potential of the development of digital media and networked technology through Indigenous cultures. This paper outlines the three phases necessary for a robust digital preservation, promotion and growth project: 1) Straightforward…

  11. Application of Two Phase (Liquid/Gas) Xenon Gamma-Camera for the Detection of Special Nuclear Material and PET Medical Imaging

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McKinsey, Daniel Nicholas

    The McKinsey group at Yale has been awarded a grant from DTRA for the building of a Liquid Xenon Gamma Ray Color Camera (LXe-GRCC), which combines state-of-the-art detection of LXe scintillation light and time projection chamber (TPC) charge readout. The DTRA application requires a movable detector and hence only a single phase (liquid) xenon detector can be considered in this case. We propose to extend the DTRA project to applications that allow a two phase (liquid/gas) xenon TPC. This entails additional (yet minimal) hardware and extension of the research effort funded by DTRA. The two phase detector will have bettermore » energy and angular resolution. Such detectors will be useful for PET medical imaging and detection of special nuclear material in stationary applications (e.g. port of entry). The expertise of the UConn group in gas phase TPCs will enhance the capabilities of the Yale group and the synergy between the two groups will be very beneficial for this research project as well as the education and research projects of the two universities. The LXe technology to be used in this project has matured rapidly over the past few years, developed for use in detectors for nuclear physics and astrophysics. This technology may now be applied in a straightforward way to the imaging of gamma rays. According to detailed Monte Carlo simulations recently performed at Yale University, energy resolution of 1% and angular resolution of 3 degrees may be obtained for 1.0 MeV gamma rays, using existing technology. With further research and development, energy resolution of 0.5% and angular resolution of 1.3 degrees will be possible at 1.0 MeV. Because liquid xenon is a high density, high Z material, it is highly efficient for scattering and capturing gamma rays. In addition, this technology scales elegantly to large detector areas, with several square meter apertures possible. The Yale research group is highly experienced in the development and use of noble liquid detectors for astrophysics, most recently in the XENON10 experiment. The existing facilities at Yale are fully adequate for the completion of this project. The facilities of the UConn group at the LNS at Avery Point include a (clean) lab for detector development and this group recently delivered an Optical Readout TPC (O-TPC) for research in Nuclear Astrophysics at the TUNL in Duke University. The machine shop at UConn will be used (free of charge) for producing the extra hardware needed for this project including grids and frames.« less

  12. Project for a Contrastive Analysis of the Sound Systems, Grammars and Lexicons of Serbo-Croatian and English. Phase 1: Phonology and Grammar. Final Report.

    ERIC Educational Resources Information Center

    Filipovic, Rudolf

    This project provides descriptions of some points of contrast between Serbo-Croatian and English in the fields of phonology, grammar, and lexicon. The project concentrated particularly on the points showing difficulties for the English-speaking learner of Serbo-Croatian, thus forming the basis for development of teaching materials and guides for…

  13. Dynamic flashing yellow arrow (FYA): a study on variable left-turn mode operational and safety impacts phase II - model expansion and testing : [summary].

    DOT National Transportation Integrated Search

    2016-05-01

    In phase two of this project, the UCF team further developed the DSS to automate selection of FYA left-turn modes based on traffic volumes at intersections acquired in real time from existing sensors.

  14. Digitizing Images for Curriculum 21: Phase II.

    ERIC Educational Resources Information Center

    Walker, Alice D.

    Although visual databases exist for the study of art, architecture, geography, health care, and other areas, readily accessible sources of quality images are not available for engineering faculty interested in developing multimedia modules or for student projects. Presented here is a brief review of Phase I of the Engineering Visual Database…

  15. Cold in-place recycling using solventless emulsion - phase IV (emulsion qualification and long-term field performance).

    DOT National Transportation Integrated Search

    2016-05-01

    This report looks into how a successful Cold In-Place solventless emulsion behaves and how the emulsion : break test developed in Phase III of this project demonstrates that behavior. Modifications to the test have been : made to improve the consiste...

  16. DEVELOPMENT OF AN ENVIRONMENTALLY FRIENDLY AND ECONOMICAL PROCESS FOR PLUGGING ABANDONED WELLS (PHASE II)

    EPA Science Inventory

    The phase II of this project was successfully completed with field tests being presently underway. It was found from the laboratory study that the fly ash slurry had sufficient thickening time and could be pumped successfully through coiled and straight tubing. Pumping through...

  17. Overview of ERA Integrated Technology Demonstration (ITD) 51A Ultra-High Bypass (UHB) Integration for Hybrid Wing Body (HWB)

    NASA Technical Reports Server (NTRS)

    Flamm, Jeffrey D.; James, Kevin D.; Bonet, John T.

    2016-01-01

    The NASA Environmentally Responsible Aircraft Project (ERA) was a ve year project broken into two phases. In phase II, high N+2 Technical Readiness Level demonstrations were grouped into Integrated Technology Demonstrations (ITD). This paper describes the work done on ITD-51A: the Vehicle Systems Integration, Engine Airframe Integration Demonstration. Refinement of a Hybrid Wing Body (HWB) aircraft from the possible candidates developed in ERA Phase I was continued. Scaled powered, and unpowered wind- tunnel testing, with and without acoustics, in the NASA LARC 14- by 22-foot Subsonic Tunnel, the NASA ARC Unitary Plan Wind Tunnel, and the 40- by 80-foot test section of the National Full-Scale Aerodynamics Complex (NFAC) in conjunction with very closely coupled Computational Fluid Dynamics was used to demonstrate the fuel burn and acoustic milestone targets of the ERA Project.

  18. A pilot level decision analysis of thermionic reactor development strategy for nuclear electric propulsion

    NASA Technical Reports Server (NTRS)

    Menke, M. M.; Judd, B. R.

    1973-01-01

    The development policy for thermionic reactors to provide electric propulsion and power for space exploration was analyzed to develop a logical procedure for selecting development alternatives that reflect the technical feasibility, JPL/NASA project objectives, and the economic environment of the project. The partial evolution of a decision model from the underlying philosophy of decision analysis to a deterministic pilot phase is presented, and the general manner in which this decision model can be employed to examine propulsion development alternatives is illustrated.

  19. The Impact of Early Design Phase Risk Identification Biases on Space System Project Performance

    NASA Technical Reports Server (NTRS)

    Reeves, John D., Jr.; Eveleigh, Tim; Holzer, Thomas; Sarkani, Shahryar

    2012-01-01

    Risk identification during the early design phases of complex systems is commonly implemented but often fails to result in the identification of events and circumstances that truly challenge project performance. Inefficiencies in cost and schedule estimation are usually held accountable for cost and schedule overruns, but the true root cause is often the realization of programmatic risks. A deeper understanding of frequent risk identification trends and biases pervasive during space system design and development is needed, for it would lead to improved execution of existing identification processes and methods.

  20. Irrigated rice area estimation using remote sensing techniques: Project's proposal and preliminary results. [Rio Grande do Sul, Brazil

    NASA Technical Reports Server (NTRS)

    Parada, N. D. J. (Principal Investigator); Deassuncao, G. V.; Moreira, M. A.; Novaes, R. A.

    1984-01-01

    The development of a methodology for annual estimates of irrigated rice crop in the State of Rio Grande do Sul, Brazil, using remote sensing techniques is proposed. The project involves interpretation, digital analysis, and sampling techniques of LANDSAT imagery. Results are discussed from a preliminary phase for identifying and evaluating irrigated rice crop areas in four counties of the State, for the crop year 1982/1983. This first phase involved just visual interpretation techniques of MSS/LANDSAT images.

  1. 40 CFR 35.1650-6 - Reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Reports. (a) States with Phase 1 projects shall submit semi-annual progress reports (original and one copy... in the next six months. (b) Phase 2. States with Phase 2 projects shall submit progress reports... Phase 2 project progress reports shall be determined by the size and complexity of the project, and...

  2. 40 CFR 35.1650-6 - Reports.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Reports. (a) States with Phase 1 projects shall submit semi-annual progress reports (original and one copy... in the next six months. (b) Phase 2. States with Phase 2 projects shall submit progress reports... Phase 2 project progress reports shall be determined by the size and complexity of the project, and...

  3. 40 CFR 35.1650-2 - Limitations on awards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... which shall be completed before the project is awarded. (b) Before awarding Phase 2 projects, the Regional Administrator shall further determine that: (1) When a Phase 1 project was awarded, the final... restoration plan selected under the Phase 1 project must be implemented under a Phase 2 cooperative agreement...

  4. BUILDING MATERIALS RECLAMATION PROGRAM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. Weggel; Shen-En Chen; Helene Hilger

    2010-08-31

    This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisorymore » panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.« less

  5. High Power RF Testing of A 3-Cell Superconducting Traveling Wave Accelerating Structure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kanareykin, Alex; Kostin, Romna; Avrakhov, Pavel

    Euclid Techlabs has completed the Phase II SBIR project, entitled “High Power RF Testing of a 3-Cell Superconducting Traveling Wave Accelerating Structure” under Grant #DE-SC0006300. In this final technical report, we summarize the major achievements of Phase I of the project and review the details of Phase II of the project. The accelerating gradient in a superconducting structure is limited mainly by quenching, i.e., by the maximum surface RF magnetic field. Various techniques have been developed to increase the gradient. A traveling wave accelerating SC structure with a feedback waveguide was suggested to allow an increased transit time factor andmore » ultimately, a maximum gradient that is 22%-24% higher than in the best of the time standing wave SRF cavity solution. The proposed structure has an additional benefit in that it can be fabricated much longer than the standing wave ones that are limited by the field flatness factor. Taken together, all of these factors will result in a significant overall length and, correspondingly cost reduction of the SRF based linear collider ILC or SRF technology based FELs. In Phase I of this project, a 3-cell L-band SC traveling wave cavity was designed. Cavity shape, surface field ratios, inter-cell coupling coefficients, accelerating field flatness have been reviewed with the analysis of tuning issues. Moreover, the technological aspects of SC traveling wave accelerating structure fabrication have been studied. As the next step in the project, the Phase II experimental program included engineering design, manufacturing, surface processing and high gradient testing. Euclid Techlabs, LLC contracted AES, Inc. to manufacture two niobium cavities. Euclid Techlabs cold tested traveling wave regime in the cavity, and the results showed very good agreement with mathematical model specially developed for superconducting traveling wave cavity performance analysis. Traveling wave regime was adjusted by amplitude and phase variation of input signals due to application of developed power feeding scheme. Traveling wave excitation, adjustment and detection were successfully tested. Auxiliary equipment required for high power test such as the tuner, power and measure couplers, holding plates for VTS at Fermilab were developed and successfully tested. Both TW SRF cavities were fabricated by AES, Inc. without stiffening ribs before this company closed their production facility. Currently Roark EB welding company is finishing now welding process of the cavity for the high power testing at Fermilab VTS. Successful demonstration of high gradients in the 3-cell cavity along with studies of traveling wave excitation and tuning issues is leading to successful development of superconducting traveling wave technology for ILC applications and other future high energy SC accelerators.« less

  6. A Liver-centric Multiscale Modeling Framework for Xenobiotics ...

    EPA Pesticide Factsheets

    We describe a multi-scale framework for modeling acetaminophen-induced liver toxicity. Acetaminophen is a widely used analgesic. Overdose of acetaminophen can result in liver injury via its biotransformation into toxic product, which further induce massive necrosis. Our study focuses on developing a multi-scale computational model to characterize both phase I and phase II metabolism of acetaminophen, by bridging Physiologically Based Pharmacokinetic (PBPK) modeling at the whole body level, cell movement and blood flow at the tissue level and cell signaling and drug metabolism at the sub-cellular level. To validate the model, we estimated our model parameters by fi?tting serum concentrations of acetaminophen and its glucuronide and sulfate metabolites to experiments, and carried out sensitivity analysis on 35 parameters selected from three modules. Our study focuses on developing a multi-scale computational model to characterize both phase I and phase II metabolism of acetaminophen, by bridging Physiologically Based Pharmacokinetic (PBPK) modeling at the whole body level, cell movement and blood flow at the tissue level and cell signaling and drug metabolism at the sub-cellular level. This multiscale model bridges the CompuCell3D tool used by the Virtual Tissue project with the httk tool developed by the Rapid Exposure and Dosimetry project.

  7. Mandated monitoring of post-project impacts in the Czech EIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Branis, Martin; Christopoulos, Stamatios

    2005-04-15

    Altogether, 801 documents of consent (50% of all) issued under the EIA Act No. 244/1992 by the competent authorities in the Czech Republic between 1993 and 2001 were studied. The aim of the analysis was to find and characterize conditions prescribing to the developer to perform ex-ante and ex-post monitoring of potential impacts of projects submitted for approval. It was found that each of the studied documents (standpoints) contained on average three to four conditions prescribing to collect data on various environmental factors during the preparation, implementation and/or operation phase of the development in question. The number of monitoring conditionsmore » contained in the standpoints issued by the Ministry of Environment as well as by the District Offices increased during the period studied from about two to five per project indicating a growing interest in and/or need to obtaining such data. Even though there is a good legal background for collecting monitoring data from implementation and operation phase of new developments, the Czech EIA Act (similarly as EIA acts in other countries) does not provide any practical background for this activity. Without relevant institutional, personal and financial support the possibility to impose post-project monitoring to the developer remains rather a challenge to, not advantage of the Czech EIA Act.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    William C. Maurer; William J. McDonald; Thomas E. Williams

    Underbalanced drilling is experiencing growth at a rate that rivals that of horizontal drilling in the mid-1980s and coiled-tubing drilling in the 1990s. Problems remain, however, for applying underbalanced drilling in a wider range of geological settings and drilling environments. This report addresses developments under this DOE project to develop products aimed at overcoming these problems. During Phase I of the DOE project, market analyses showed that up to 12,000 wells per year (i.e., 30% of all wells) will be drilled underbalanced in the U.S.A. within the next ten years. A user-friendly foam fluid hydraulics model (FOAM) was developed formore » a PC Windows environment during Phase I. FOAM predicts circulating pressures and flow characteristics of foam fluids used in underbalanced drilling operations. FOAM is based on the best available mathematical models, and was validated through comparison to existing models, laboratory test data and field data. This model does not handle two-phase flow or air and mist drilling where the foam quality is above 0.97. This FOAM model was greatly expanded during Phase II including adding an improved foam rheological model and a ''matching'' feature that allows the model to be field calibrated. During Phase I, a lightweight drilling fluid was developed that uses hollow glass spheres (HGS) to reduce the density of the mud to less than that of water. HGS fluids have several advantages over aerated fluids, including they are incompressible, they reduce corrosion and vibration problems, they allow the use of mud-pulse MWD tools, and they eliminate high compressor and nitrogen costs. Phase II tests showed that HGS significantly reduce formation damage with water-based drilling and completion fluids and thereby potentially can increase oil and gas production in wells drilled with water-based fluids. Extensive rheological testing was conducted with HGS drilling and completion fluids during Phase II. These tests showed that the HGS fluids act similarly to conventional fluids and that they have potential application in many areas, including underbalanced drilling, completions, and riserless drilling. Early field tests under this project are encouraging. These led to limited tests by industry (which are also described). Further field tests and cost analyses are needed to demonstrate the viability of HGS fluids in different applications. Once their effectiveness is demonstrated, they should find widespread application and should significantly reduce drilling costs and increase oil and gas production rates. A number of important oilfield applications for HGS outside of Underbalanced Drilling were identified. One of these--Dual Gradient Drilling (DGD) for deepwater exploration and development--is very promising. Investigative work on DGD under the project is reported, along with definition of a large joint-industry project resulting from the work. Other innovative products/applications are highlighted in the report including the use of HGS as a cement additive.« less

  9. Deep Bore Storage of Nuclear Waste Using MMW (Millimeter Wave) Technology, STTR Fast Track Project, Phase I Final Report-Revised

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oglesby, Kenneth D.; Woskov, Paul; Einstein, Herbert

    This report covers the technical work in Phase I of this DOE-Nuclear Program STTR Fast Track project. All key tasks were successfully performed, new tasks were added to utilize DOD-AFRL’s 95 GigaHertz (GHz) gyrotron in Phase II, while other lesser tasks were left for Phase II efforts or were requested to be made optional. This research adds to our understanding of using MMW power to melt and vaporize rocks and steel/ metals and laid plans for future testing in Phase II. This work built upon a prior DOE project DE-EE0005504 that developed the basic waveguide setup, process and instruments. Inmore » this project we were investigating the use of MMW to form rock melt and steel plugs in deep wells to further isolate highly radioactive nuclear waste in ultra-deep basement rocks for long term storage. This technology also has potential for deep well drilling for nuclear storage, geothermal and oil and gas industries. It also has the potential for simultaneously sealing and securing the wellbore with a thick rock melt liner as the wellbore is drilled. This allows for higher levels of safety and protection of the environment during deep drilling operations. The larger purpose of this project was to find answers to key questions in progressing MMW technology for these applications. Phase I of this project continued bench testing using the MIT 10 kilo-Watt (kW), 28 GHz frequency laboratory gyrotron, literature searches, planning and design of equipment for Phase II efforts. Furnace melting and rock testing (Tasks 4 and 5) were deferred to Phase II due to lack of concurrent availability of the furnace and personnel at MIT. That delay and lower temperature furnace (limited to 1650oC) caused rethinking of Task 4 to utilize coordinated rock selection with the DOD testing in Phase II. The high pressure and high power window design work (moved to Phase I Task 3 from Phase II Task 20) and Additive materials and methods (Tasks 7 & 8) performed in Phase I may become patentable and thus little detail can be provided in this public report. A version of that new high pressure, high MMW power window may be built for possible Phase II testing at the DOD site. Most significantly, additional tasks were added for planning the use of the Department of Defense, Air Force Research Laboratory’s (DOD-AFRL’s) System 0 gyrotron in Phase II. Specifically added and accomplished were multiple discussions on DOD and DOE-MIT-Impact goals, timing between ongoing DOD testing, outlining the required equipment and instruments for rock testing, and terms for an agreement. That addition required a visit to Kirtland AFB in Albuquerque, New Mexico to talk to key DOD-AFRL personnel and management. A DOD-Impact-MIT charter (i.e., contract) is now being circulated for signatures. Also added task to Phase I, MIT designed the critical path reflected power isolator screen for Phase II testing. To ensure compatibility, that design was computer simulated for the expected heat load distribution and the resulting temperature increase. Advancing the MMW testing up to the optimum 95 GHz and 100kW (5X higher) power levels was stated in the original proposal to be a key required development step for this technology to achieve prototype drilling, lining, and rock melting/ vaporization for creating sealing plugs.« less

  10. Developing integrated parametric planning models for budgeting and managing complex projects

    NASA Technical Reports Server (NTRS)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  11. Milk cow feed intake and milk production and distribution estimates for Phase 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck, D.M.; Darwin, R.F.; Erickson, A.R.

    1992-04-01

    This report provides initial information on milk production and distribution in the Hanford Environmental Dose Reconstruction (HEDR) Project Phase I study area. The Phase I study area consists of eight countries in central Washington and two countries in northern Oregon. The primary objective of the HEDR Project is to develop estimates of the radiation doses populations could have received from Hanford operations. The objective of Phase I of the project was to determine the feasibility of reconstructing data, models, and development of preliminary dose estimates received by people living in the ten countries surrounding Hanford from 1944 to 1947. Onemore » of the most important contributors to radiation doses from Hanford during the period of interest was radioactive iodine. Consumption of milk from cows that ate vegetation contaminated with iodine is likely the dominant pathway of human exposure. To estimate the doses people could have received from this pathway, it is necessary to estimate the amount of milk that the people living in the Phase I area consumed, the source of the milk, and the type of feed that the milk cows ate. The objective of the milk model subtask is to identify the sources of milk supplied to residents of each community in the study area as well as the sources of feeds that were fed to the milk cows. In this report, we focus on Grade A cow's milk (fresh milk used for human consumption).« less

  12. FINAL REPORT WIND POWER WARM SPRINGS RESERVATION TRIBAL LANDS DOE GRANT NUMBER DE-FG36-07GO17077 SUBMITTED BY WARM SPRINGS POWER & WATER ENTERPRISES A CORPORATE ENTITY OF THE CONFEDERATED TRIBES OF WARM SPRINGS WARM SPRINGS, OREGON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jim Manion; Michael Lofting; Wil Sando

    2009-03-30

    Wind Generation Feasibility Warm Springs Power and Water Enterprises (WSPWE) is a corporate entity owned by the Confederated Tribes of the Warm Springs Reservation, located in central Oregon. The organization is responsible for managing electrical power generation facilities on tribal lands and, as part of its charter, has the responsibility to evaluate and develop renewable energy resources for the Confederated Tribes of Warm Springs. WSPWE recently completed a multi-year-year wind resource assessment of tribal lands, beginning with the installation of wind monitoring towers on the Mutton Mountains site in 2003, and collection of on-site wind data is ongoing. The studymore » identified the Mutton Mountain site on the northeastern edge of the reservation as a site with sufficient wind resources to support a commercial power project estimated to generate over 226,000 MWh per year. Initial estimates indicate that the first phase of the project would be approximately 79.5 MW of installed capacity. This Phase 2 study expands and builds on the previously conducted Phase 1 Wind Resource Assessment, dated June 30, 2007. In order to fully assess the economic benefits that may accrue to the Tribes through wind energy development at Mutton Mountain, a planning-level opinion of probable cost was performed to define the costs associated with key design and construction aspects of the proposed project. This report defines the Mutton Mountain project costs and economics in sufficient detail to allow the Tribes to either build the project themselves or contract with a developer under the most favorable terms possible for the Tribes.« less

  13. Advanced Hybrid Particulate Collector Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, S.J.

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the bestmore » method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting« less

  14. THE APPLICATION AND DEVELOPMENT OF APPROPRIATE TOOLS AND TECHNOLOGIES FOR COST-EFFECTIVE CARBON SEQUESTRATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Stanley; Sandra Brown; Ellen Hawes

    2002-09-01

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research projects is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas impacts. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: advanced videography testing; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less

  15. System-Level Experimental Validations for Supersonic Commercial Transport Aircraft Entering Service in the 2018-2020 Time Period

    NASA Technical Reports Server (NTRS)

    Magee, Todd E.; Fugal, Spencer R.; Fink, Lawrence E.; Adamson, Eric E.; Shaw, Stephen G.

    2015-01-01

    This report describes the work conducted under NASA funding for the Boeing N+2 Supersonic Experimental Validation project to experimentally validate the conceptual design of a supersonic airliner feasible for entry into service in the 2018 -to 2020 timeframe (NASA N+2 generation). The primary goal of the project was to develop a low-boom configuration optimized for minimum sonic boom signature (65 to 70 PLdB). This was a very aggressive goal that could be achieved only through integrated multidisciplinary optimization tools validated in relevant ground and, later, flight environments. The project was split into two phases. Phase I of the project covered the detailed aerodynamic design of a low boom airliner as well as the wind tunnel tests to validate that design (ref. 1). This report covers Phase II of the project, which continued the design methodology development of Phase I with a focus on the propulsion integration aspects as well as the testing involved to validate those designs. One of the major airplane configuration features of the Boeing N+2 low boom design was the overwing nacelle. The location of the nacelle allowed for a minimal effect on the boom signature, however, it added a level of difficulty to designing an inlet with acceptable performance in the overwing flow field. Using the Phase I work as the starting point, the goals of the Phase 2 project were to design and verify inlet performance while maintaining a low-boom signature. The Phase II project was successful in meeting all contract objectives. New modular nacelles were built for the larger Performance Model along with a propulsion rig with an electrically-actuated mass flow plug. Two new mounting struts were built for the smaller Boom Model, along with new nacelles. Propulsion integration testing was performed using an instrumented fan face and a mass flow plug, while boom signatures were measured using a wall-mounted pressure rail. A side study of testing in different wind tunnels was completed as a precursor to the selection of the facilities used for validation testing. As facility schedules allowed, the propulsion testing was done at the NASA Glenn Research Center (GRC) 8 x 6-Foot wind tunnel, while boom and force testing was done at the NASA Ames Research Center (ARC) 9 x 7-Foot wind tunnel. During boom testing, a live balance was used for gathering force data. This report is broken down into nine sections. The first technical section (Section 2) covers the general scope of the Phase II activities, goals, a description of the design and testing efforts, and the project plan and schedule. Section 3 covers the details of the propulsion system concepts and design evolution. A series of short tests to evaluate the suitability of different wind tunnels for boom, propulsion, and force testing was also performed under the Phase 2 effort, with the results covered in Section 4. The propulsion integration testing is covered in Section 5 and the boom and force testing in Section 6. CFD comparisons and analyses are included in Section 7. Section 8 includes the conclusions and lessons learned.

  16. Slope Stabilization Using Recycled Plastic Pins, Phase III.

    DOT National Transportation Integrated Search

    2007-01-01

    A new technique for stabilizing surficial slope failures using recycled plastic reinforcing members has been developed. The : objective of the project described in this report has been to develop, evaluate, and document a technique for stabilization ...

  17. Development of a D SIGHT aircraft inspection system : phase II

    DOT National Transportation Integrated Search

    1996-03-01

    Word document. This report presents Phsase II results on an international Project Arrangement between the Federal Aviation Administration and Transport Canada Aviation for the development and testing of a nondestructive inspection system for aircraft...

  18. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    NASA Astrophysics Data System (ADS)

    Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.

    2008-07-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.

  19. Phased Project Planning Guidelines

    NASA Technical Reports Server (NTRS)

    1968-01-01

    NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

  20. C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 2: Test Bed Performance Evaluation and Final AeroMACS Recommendations

    NASA Technical Reports Server (NTRS)

    Hall, Edward; Magner, James

    2011-01-01

    This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II (this document) describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

  1. C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 1: Concepts of Use, Initial System Requirements, Architecture, and AeroMACS Design Considerations

    NASA Technical Reports Server (NTRS)

    Hall, Edward; Isaacs, James; Henriksen, Steve; Zelkin, Natalie

    2011-01-01

    This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I (this document) is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

  2. State and county delivered bridge replacement project analysis : phase I and phase II.

    DOT National Transportation Integrated Search

    2010-02-01

    The purpose of the study was to compare the cost of state delivered bridge projects and county delivered bridge projects. A total of 190 different bridge replacement projects were analyzed. The first phase of the project focused on whether or not the...

  3. Synthesis of a Novel Energetic Heterocyclic Oxidizer with Higher Energy and Lower Sensitivity (Phase 2) Final Report CRADA No. TC02125.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pagoria, P. F.; Racoveanu, A.

    2017-09-08

    This project was a continuation of work originally performed under a Phase 1 of the Small Business Technology Transfer (STIR). The success of the Phase 1 led to the award of a Phase 2 of the STIR. In Phase 1 of the STIR, the target energetic compound, 3,4-bis(4-nitro-l,2,5- oxadiazol-3yl)-1,2,5-oxadiazole-l-oxide (DNTF), was synthesized at the 5g scale and small-scale safety tests were performed. DNTF showed promising performance· and safety properties. DNTF was shown to be relatively insensitive while performing better than the current industry standard, H1vIX, in solid propellant formulations. Because of the successful research and development project involving PSI, LLNLmore » and Aerojet in Phase I of the STIR, the sponsors wanted to obtain larger quantities of DNTF for further testing.« less

  4. NASA's Hypersonic Research Engine Project: A review

    NASA Technical Reports Server (NTRS)

    Andrews, Earl H.; Mackley, Ernest A.

    1994-01-01

    The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.

  5. Water vapor radiometry research and development phase

    NASA Technical Reports Server (NTRS)

    Resch, G. M.; Chavez, M. C.; Yamane, N. L.; Barbier, K. M.; Chandlee, R. C.

    1985-01-01

    This report describes the research and development phase for eight dual-channel water vapor radiometers constructed for the Crustal Dynamics Project at the Goddard Space Flight Center, Greenbelt, Maryland, and for the NASA Deep Space Network. These instruments were developed to demonstrate that the variable path delay imposed on microwave radio transmissions by atmospheric water vapor can be calibrated, particularly as this phenomenon affects very long baseline interferometry measurement systems. Water vapor radiometry technology can also be used in systems that involve moist air meteorology and propagation studies.

  6. Simplifying the construction of domain-specific automatic programming systems: The NASA automated software development workstation project

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.; Holtzman, Peter L.

    1987-01-01

    An overview is presented of the Automated Software Development Workstation Project, an effort to explore knowledge-based approaches to increasing software productivity. The project focuses on applying the concept of domain specific automatic programming systems (D-SAPSs) to application domains at NASA's Johnson Space Center. A version of a D-SAPS developed in Phase 1 of the project for the domain of space station momentum management is described. How problems encountered during its implementation led researchers to concentrate on simplifying the process of building and extending such systems is discussed. Researchers propose to do this by attacking three observed bottlenecks in the D-SAPS development process through the increased automation of the acquisition of programming knowledge and the use of an object oriented development methodology at all stages of the program design. How these ideas are being implemented in the Bauhaus, a prototype workstation for D-SAPS development is discussed.

  7. Simplifying the construction of domain-specific automatic programming systems: The NASA automated software development workstation project

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.; Holtzman, Peter L.

    1988-01-01

    An overview is presented of the Automated Software Development Workstation Project, an effort to explore knowledge-based approaches to increasing software productivity. The project focuses on applying the concept of domain specific automatic programming systems (D-SAPSs) to application domains at NASA's Johnson Space Flight Center. A version of a D-SAPS developed in Phase 1 of the project for the domain of space station momentum management is described. How problems encountered during its implementation led researchers to concentrate on simplifying the process of building and extending such systems is discussed. Researchers propose to do this by attacking three observed bottlenecks in the D-SAPS development process through the increased automation of the acquisition of programming knowledge and the use of an object oriented development methodology at all stages of the program design. How these ideas are being implemented in the Bauhaus, a prototype workstation for D-SAPS development is discussed.

  8. QUEST/Ada (query utility environment for software testing of Ada: The development of a program analysis environment for Ada, task 1, phase 3

    NASA Technical Reports Server (NTRS)

    Brown, David B.

    1991-01-01

    The results of research and development efforts of the first six months of Task 1, Phase 3 of the project are presented. The goals of Phase 3 are: (1) to further refine the rule base and complete the comparative rule base evaluation; (2) to implement and evaluate a concurrency testing prototype; (3) to convert the complete (unit-level and concurrency) testing prototype to a workstation environment; and (4) to provide a prototype development document to facilitate the transfer of research technology to a working environment. These goals were partially met and the results are summarized.

  9. ADVANCED CUTTINGS TRANSPORT STUDY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefan Miska; Troy Reed; Ergun Kuru

    2004-09-30

    The Advanced Cuttings Transport Study (ACTS) was a 5-year JIP project undertaken at the University of Tulsa (TU). The project was sponsored by the U.S. Department of Energy (DOE) and JIP member companies. The objectives of the project were: (1) to develop and construct a new research facility that would allow three-phase (gas, liquid and cuttings) flow experiments under ambient and EPET (elevated pressure and temperature) conditions, and at different angle of inclinations and drill pipe rotation speeds; (2) to conduct experiments and develop a data base for the industry and academia; and (3) to develop mechanistic models for optimizationmore » of drilling hydraulics and cuttings transport. This project consisted of research studies, flow loop construction and instrumentation development. Following a one-year period for basic flow loop construction, a proposal was submitted by TU to the DOE for a five-year project that was organized in such a manner as to provide a logical progression of research experiments as well as additions to the basic flow loop. The flow loop additions and improvements included: (1) elevated temperature capability; (2) two-phase (gas and liquid, foam etc.) capability; (3) cuttings injection and removal system; (4) drill pipe rotation system; and (5) drilling section elevation system. In parallel with the flow loop construction, hydraulics and cuttings transport studies were preformed using drilling foams and aerated muds. In addition, hydraulics and rheology of synthetic drilling fluids were investigated. The studies were performed under ambient and EPET conditions. The effects of temperature and pressure on the hydraulics and cuttings transport were investigated. Mechanistic models were developed to predict frictional pressure loss and cuttings transport in horizontal and near-horizontal configurations. Model predictions were compared with the measured data. Predominantly, model predictions show satisfactory agreements with the measured data. As a part of this project, instrumentation was developed to monitor cuttings beds and characterize foams in the flow loop. An ultrasonic-based monitoring system was developed to measure cuttings bed thickness in the flow loop. Data acquisition software controls the system and processes the data. Two foam generating devices were designed and developed to produce foams with specified quality and texture. The devices are equipped with a bubble recognition system and an in-line viscometer to measure bubble size distribution and foam rheology, respectively. The 5-year project is completed. Future research activities will be under the umbrella of Tulsa University Drilling Research Projects. Currently the flow loop is being used for testing cuttings transport capacity of aqueous and polymer-based foams under elevated pressure and temperature conditions. Subsequently, the effect of viscous sweeps on cuttings transport under elevated pressure and temperature conditions will be investigated using the flow loop. Other projects will follow now that the ''steady state'' phase of the project has been achieved.« less

  10. Definition of optical systems payloads

    NASA Technical Reports Server (NTRS)

    Downey, J. A., III

    1981-01-01

    The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.

  11. State and county delivered bridge replacement project analysis : phase I and phase II, summary report, February 2010.

    DOT National Transportation Integrated Search

    2010-02-01

    The purpose of the study was to compare the cost of state delivered bridge projects and county delivered bridge projects. A total of 190 different bridge replacement projects were analyzed. The first phase of the project focused on whether or not the...

  12. Revising the lower statistical limit of x-ray grating-based phase-contrast computed tomography.

    PubMed

    Marschner, Mathias; Birnbacher, Lorenz; Willner, Marian; Chabior, Michael; Herzen, Julia; Noël, Peter B; Pfeiffer, Franz

    2017-01-01

    Phase-contrast x-ray computed tomography (PCCT) is currently investigated as an interesting extension of conventional CT, providing high soft-tissue contrast even if examining weakly absorbing specimen. Until now, the potential for dose reduction was thought to be limited compared to attenuation CT, since meaningful phase retrieval fails for scans with very low photon counts when using the conventional phase retrieval method via phase stepping. In this work, we examine the statistical behaviour of the reverse projection method, an alternative phase retrieval approach and compare the results to the conventional phase retrieval technique. We investigate the noise levels in the projections as well as the image quality and quantitative accuracy of the reconstructed tomographic volumes. The results of our study show that this method performs better in a low-dose scenario than the conventional phase retrieval approach, resulting in lower noise levels, enhanced image quality and more accurate quantitative values. Overall, we demonstrate that the lower statistical limit of the phase stepping procedure as proposed by recent literature does not apply to this alternative phase retrieval technique. However, further development is necessary to overcome experimental challenges posed by this method which would enable mainstream or even clinical application of PCCT.

  13. Yakama Nation Renewable Energy Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rigdon, Phillip

    2016-05-10

    It is the intention of the Yakama Nation to make improvements on the Wapato Irrigation Project (WIP) for the benefit of all stakeholders. Water management, water conservation and water allocation on the Wapato Irrigation Project is equally as important as hydropower. Irrigation will always be the primary purpose of this water system, but the irrigation system can also generate energy. The purpose of this project is the purchase and installation of inflow water turbines to generate an additional one megawatt of hydro-electrical power. The project will occur in two phases, Environmental Assessment and Project Implementation. The core objective for thismore » proposal is to meet the Yakama Nation’s goal in hydroelectric power development. This will include the installation of inflow water turbines on the Wapato Irrigation Project. The Yakama Nation will prepare an Environmental Assessment in preparation to purchase and install new water turbines for hydropower generation of 1 Megawatt. This is a valuable economic development strategy for Yakama Nation that will create new jobs, improve and increase rural electrification, and attract private investments. This water system has an untapped low head/low power potential without the need to construct a new dam. The objective of Phase 1 is to complete an environmental assessment and obtain approval to proceed with installation of the hydroelectric power system.« less

  14. Building a pan-Canadian primary care sentinel surveillance network: initial development and moving forward.

    PubMed

    Birtwhistle, Richard; Keshavjee, Karim; Lambert-Lanning, Anita; Godwin, Marshall; Greiver, Michelle; Manca, Donna; Lagacé, Claudia

    2009-01-01

    The development of a pan-Canadian network of primary care research networks for studying issues in primary care has been the vision of Canadian primary care researchers for many years. With the opportunity for funding from the Public Health Agency of Canada and the support of the College of Family Physicians of Canada, we have planned and developed a project to assess the feasibility of a network of networks of family medicine practices that exclusively use electronic medical records. The Canadian Primary Care Sentinel Surveillance Network will collect longitudinal data from practices across Canada to assess the primary care epidemiology and management of 5 chronic diseases: hypertension, diabetes, depression, chronic obstructive lung disease, and osteoarthritis. This article reports on the 7-month first phase of the feasibility project of 7 regional networks in Canada to develop a business plan, including governance, mission, and vision; develop memorandum of agreements with the regional networks and their respective universities; develop and obtain approval of research ethics board applications; develop methods for data extraction, a Canadian Primary Care Sentinel Surveillance Network database, and initial assessment of the types of data that can be extracted; and recruitment of 10 practices at each network that use electronic medical records. The project will continue in phase 2 of the feasibility testing until April 2010.

  15. Beginning Teacher Evaluation Study: Phase II, 1973-74, Final Report: Volume III.2. Reading and Mathematics Observation System: Description and Analysis of Time Expenditures.

    ERIC Educational Resources Information Center

    Calfee, Robert; Calfee, Kathryn Hoover

    The Beginning Teacher Evaluation Study (BTES), Phase II, was a research project on effective teaching behavior--what teachers do that significantly affects what and how pupils learn. The purposes of Phase II were to (1) develop an assessment system for measuring teacher and pupil behaviors and other factors which could influence each of them and…

  16. Assessment Inventories, Surveys, and Templates for Evaluating Educational Technology Regional and Local Assistance Programs. Phase IV of the Comprehensive Study of Educational Technology Programs Authorized from 1984-1992.

    ERIC Educational Resources Information Center

    Far West Lab. for Educational Research and Development, San Francisco, CA.

    This report on Phase IV, of a four-phase study, provided for the development of evaluation templates and instruments to be used by the California Department of Education to facilitate systematic assessment of state funded educational technology programs and projects. These assessment documents comprised the major data collection sources for the…

  17. Long-term archives of land surface albedo products through the EUMETSAT/LSA-SAF and ECMWF/C3S projects: status and project development plan

    NASA Astrophysics Data System (ADS)

    Carrer, D.; Pinault, F.; Ceamanos, X.; Meurey, C.; Moparthy, S.; Swinnen, E.; Trigo, I.

    2017-12-01

    The two space programs of EUMETSAT (project CDOP3, LSA-SAF) and ECMWF (the Copernicus Climate Change Service; C3S_312a Lot9) provide (or will provide) added-value satellite products for the meteorological and environmental science communities, especially in the fields of climate modeling, environmental management, natural hazards management, and climate change detection. The EUMETSAT/LSA-SAF project started in 1999 with research and development activities. The Third Continuous Development and Operations Phase (CDOP-3) starts in March 2017 and will end in 2022. This project uses instruments on board European satellites that were, or will be, launched between 2004 and 2022. Unlike the LSA-SAF, the COPERNICUS/C3S_312a project has no NRT constraint. Its first phase started in november 2016. One of the major objective of the COPERNICUS/C3S_312a project is to harmonize datasets from various sensors in order to provide consistent and continuous ECV products from the 80's until now.Presently, the delivered operational products comprise several surface albedo products using data from various space missions (METEOSAT, NOAA, METOP, …). We present here the portfolio of the surface albedo products that are disseminated with an operational status. Their characteristics and accuracy are detailed here after. Also we will present the development plan to produce long-term re-analysis and to prepare the arrival of the next generation of satellite (MTG, EPS-SG, ...). This work will lead in 2018 to 40 years of products characterizing the albedo properties of the surface. These programs provide a great opportunity to monitor and identify human-induced climate change since consistent production of data sets is guaranteed until at least 2022.

  18. Automated recognition of helium speech. Phase I: Investigation of microprocessor based analysis/synthesis system

    NASA Astrophysics Data System (ADS)

    Jelinek, H. J.

    1986-01-01

    This is the Final Report of Electronic Design Associates on its Phase I SBIR project. The purpose of this project is to develop a method for correcting helium speech, as experienced in diver-surface communication. The goal of the Phase I study was to design, prototype, and evaluate a real time helium speech corrector system based upon digital signal processing techniques. The general approach was to develop hardware (an IBM PC board) to digitize helium speech and software (a LAMBDA computer based simulation) to translate the speech. As planned in the study proposal, this initial prototype may now be used to assess expected performance from a self contained real time system which uses an identical algorithm. The Final Report details the work carried out to produce the prototype system. Four major project tasks were: a signal processing scheme for converting helium speech to normal sounding speech was generated. The signal processing scheme was simulated on a general purpose (LAMDA) computer. Actual helium speech was supplied to the simulation and the converted speech was generated. An IBM-PC based 14 bit data Input/Output board was designed and built. A bibliography of references on speech processing was generated.

  19. Thermal model of attic systems with radiant barriers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilkes, K.E.

    This report summarizes the first phase of a project to model the thermal performance of radiant barriers. The objective of this phase of the project was to develop a refined model for the thermal performance of residential house attics, with and without radiant barriers, and to verify the model by comparing its predictions against selected existing experimental thermal performance data. Models for the thermal performance of attics with and without radiant barriers have been developed and implemented on an IBM PC/AT computer. The validity of the models has been tested by comparing their predictions with ceiling heat fluxes measured inmore » a number of laboratory and field experiments on attics with and without radiant barriers. Cumulative heat flows predicted by the models were usually within about 5 to 10 percent of measured values. In future phases of the project, the models for attic/radiant barrier performance will be coupled with a whole-house model and further comparisons with experimental data will be made. Following this, the models will be utilized to provide an initial assessment of the energy savings potential of radiant barriers in various configurations and under various climatic conditions. 38 refs., 14 figs., 22 tabs.« less

  20. Developing a prediction model for Armillaria solidipes in Arizona

    Treesearch

    N. B. Klopfenstein; J. W Hanna; M. L. Fairweather; J. D. Shaw; R. Mathiasen; C. Hoffman; E. Nelson; M. -S. Kim; A. L. Ross-Davis

    2012-01-01

    In 2010, a collaborative project was started to determine the distribution of Armillaria solidipes (= A. ostoyae) in Arizona. The methods and preliminary accomplishments of the 2010 and 2011 (ongoing) field surveys/collections are summarized. During the next phase of this project, surveys will be completed and remaining Armillaria isolates will be identified using DNA-...

Top