Sample records for development projects completed

  1. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  2. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  3. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  4. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  5. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  6. 24 CFR 891.545 - Completion of project, cost certification, and HUD approvals.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Completion of project, cost... DISABILITIES Loans for Housing for the Elderly and Persons with Disabilities Section 202 Projects for the Elderly Or Handicapped-Section 8 Assistance § 891.545 Completion of project, cost certification, and HUD...

  7. 24 CFR 891.545 - Completion of project, cost certification, and HUD approvals.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Completion of project, cost... DISABILITIES Loans for Housing for the Elderly and Persons with Disabilities Section 202 Projects for the Elderly Or Handicapped-Section 8 Assistance § 891.545 Completion of project, cost certification, and HUD...

  8. 24 CFR 891.545 - Completion of project, cost certification, and HUD approvals.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Completion of project, cost... DISABILITIES Loans for Housing for the Elderly and Persons with Disabilities Section 202 Projects for the Elderly Or Handicapped-Section 8 Assistance § 891.545 Completion of project, cost certification, and HUD...

  9. Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, C.; Lightman, A.

    This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.

  10. 31 CFR 500.413 - Participation in certain development projects in Vietnam.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... However, had the ADB formally proposed the project in its monthly ADB Business Opportunities as a project... continued management and operation of the plants by the U.S. Company after completion, and for the insurance... is completed, Vietnam hires a U.S. marketing firm to develop marketing strategies for the product...

  11. 24 CFR 200.54 - Project completion funding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Project completion funding. 200.54... Project completion funding. (a) Except as provided in paragraph (d) of this section, the mortgagor shall... conditions established by the Commissioner, where the required funding is to be provided by a grant or loan...

  12. 24 CFR 200.54 - Project completion funding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Project completion funding. 200.54... Project completion funding. (a) Except as provided in paragraph (d) of this section, the mortgagor shall... conditions established by the Commissioner, where the required funding is to be provided by a grant or loan...

  13. [Research progresses of the completed pediatrics projects funded by National Natural Science Foundation of China from 2002 to 2006].

    PubMed

    Xu, Ling; Hao, Jie; Deng, Min; Xu, Yan-ying

    2009-05-01

    To understand the projects completion and research progresses in pediatrics which were funded by the National Natural Science Foundation of China (NSFC), and evaluate the accomplishment objectively and justly. The completion status of projects in pediatrics funded by department of clinical medicine II from 2002 to 2006 was analysed retrospectively, and important research achievement and outstanding development in some projects were reported. During the period between 2002 and 2006, 420 articles were published, and the average was 8.1 papers per project, which included 56 papers that were published in journals indexed by SCI (the average was 1.1 papers per project). The completion of general project was better than that of "the Young Researchers Fund" and small grant project. Ten post-doctors, 102 doctors and 109 masters were trained. Two projects were awarded with the first grade prize and another 2 with the second grade prize at the provincial and ministerial level, 4 items applied for patent and 1 was granted. These completed projects, which were mainly related to 7 of 12 subspecialties in the field of pediatrics, such as the respiratory disease, nephrology, neurology, cardiology, endocrinology, hematology, neonatology, are the major portion of the application projects and subsidized projects funded by NSFC, and achieved great research progresses. During the period between 2002 and 2006, the 52 completed projects in pediatrics showed difference in the distribution and quality of accomplishment among subspecialties and among types of supported projects; there are some gaps between pediatrics and some other clinical basic subspecialties II, this situation released the research status and problems in development of pediatrics in China. The general projects completion was good, and many projects obtained research achievements, which reflect the leading function of NSFC in pediatric research.

  14. Creating Jobs through Energy Efficiency Using Wisconsin's Successful Focus on Energy Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Akhtar, Masood; Corrigan, Edward; Reitter, Thomas

    2012-03-30

    The purpose of this project was to provide administrative and technical support for the completion of energy efficiency projects that reduce energy intensity and create or save Wisconsin industrial jobs. All projects have been completed. Details in the attached reports include project management, job development, and energy savings for each project.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Jennifer

    The Washoe Tribe of Nevada and California was awarded funding to complete the Washoe Tribe Alternative Energy Feasibility Study project. The main goal of the project was to complete an alternative energy feasibility study. This study was completed to evaluate “the potential for development of a variety of renewable energy projects and to conduct an alternative energy feasibility study that determines which alternative energy resources have the greatest economic opportunity for the Tribe, while respecting cultural and environmental values” (Baker-Tilly, 2014). The study concluded that distributed generation solar projects are the best option for renewable energy development and asset ownershipmore » for the Washoe Tribe. Concentrating solar projects, utility scale wind projects, geothermal, and biomass resource projects were also evaluated during the study and it was determined that these alternatives would not be feasible at this time.« less

  16. Development of a Quality Improvement Curriculum in Physician Assistant Studies.

    PubMed

    Kindratt, Tiffany B; Orcutt, Venetia L

    2017-06-01

    The purpose of this project was to develop and evaluate a curriculum for physician assistant (PA) students addressing knowledge, skills, and attitudes (KSA) toward quality improvement (QI). Students (N = 77) completed a pretest rating their KSA. A curriculum was developed to improve KSA among didactic and clinical students. Two department-wide QI projects were developed for student participation. Students completed a posttest after completing curriculum components and changes in KSA had been measured. Postcurriculum implementation, QI knowledge, and skills increased significantly in most areas. Large improvements were seen in knowledge of Plan, Do, Study, Act models and life cycles of QI projects (p < .0001). Seven students (20%) participated in department-wide projects. Our curriculum model (1) was effective at improving students' QI knowledge and skills; (2) allowed students to participate in community-based QI projects; and (3) can be used by other PA programs looking to enhance their QI curriculum.

  17. Southeast regional fatal study : a causal chain analysis in North Carolina

    DOT National Transportation Integrated Search

    2002-01-01

    This project completed the North Carolina portion of the pooled fund Southeast Fatal Analysis Project. In addition : to completing this portion of the causal chain analysis for NC Crashes, the project developed a ranked : comprehensive list of candid...

  18. Improving Project Management with Simulation and Completion Distribution Functions

    NASA Technical Reports Server (NTRS)

    Cates, Grant R.

    2004-01-01

    Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

  19. 24 CFR 941.404 - Completion of development.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Completion of development. 941.404 Section 941.404 Housing and Urban Development Regulations Relating to Housing and Urban Development... DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.404 Completion of development. (a) When all...

  20. Research notes : ensuring project performance and adherence to completion dates.

    DOT National Transportation Integrated Search

    2009-04-01

    A recently completed ODOT research project, led by David Sillars at Oregon State University, sought to identify alternative methods to liquidated damages for ODOT to encourage on-time project delivery and to develop a model to aid in selecting among ...

  1. Program of Research in the Field of Human Resources Development with Special Reference to Asia and the Far East; Annotated List of Research Projects Completed and Proposed.

    ERIC Educational Resources Information Center

    Mehta, M.M.

    Summaries of nine research projects completed and 26 research projects proposed or in progress, titles of papers produced in coordinated research and teaching programs, and a list of 13 international, national, or regional, seminars, conferences, or expert working group meetings contributing to human resources development in Asia and the Far East…

  2. 24 CFR 266.600 - Mortgage insurance premium: Insurance upon completion.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Mortgage insurance premium... MULTIFAMILY PROJECT LOANS Contract Rights and Obligations Mortgage Insurance Premiums § 266.600 Mortgage insurance premium: Insurance upon completion. (a) Initial premium. For projects insured upon completion, on...

  3. 24 CFR 266.600 - Mortgage insurance premium: Insurance upon completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Mortgage insurance premium... MULTIFAMILY PROJECT LOANS Contract Rights and Obligations Mortgage Insurance Premiums § 266.600 Mortgage insurance premium: Insurance upon completion. (a) Initial premium. For projects insured upon completion, on...

  4. Title III: Curricular Development for Secondary Learning Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Goodman, Libby

    Presented is the final report of a 2-year project to develop an examplary model classroom program and curriculum for the secondary learning disabled student. Section I consists of completed forms entitled Project Completion Report, Termination Report, and Equipment Inventory. Outlined in Section II is information on the following project…

  5. 30 CFR 250.287 - For what development projects must I submit a DWOP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false For what development projects must I submit a... Operations Plans (dwop) § 250.287 For what development projects must I submit a DWOP? You must submit a DWOP for each development project in which you will use non-conventional production or completion...

  6. Quality improvement training for core medical and general practice trainees: a pilot study of project participation, completion and journal publication.

    PubMed

    McNab, Duncan; McKay, John; Bowie, Paul

    2015-11-01

    Small-scale quality improvement projects are expected to make a significant contribution towards improving the quality of healthcare. Enabling doctors-in-training to design and lead quality improvement projects is important preparation for independent practice. Participation is mandatory in speciality training curricula. However, provision of training and ongoing support in quality improvement methods and practice is variable. We aimed to design and deliver a quality improvement training package to core medical and general practice specialty trainees and evaluate impact in terms of project participation, completion and publication in a healthcare journal. A quality improvement training package was developed and delivered to core medical trainees and general practice specialty trainees in the west of Scotland encompassing a 1-day workshop and mentoring during completion of a quality improvement project over 3 months. A mixed methods evaluation was undertaken and data collected via questionnaire surveys, knowledge assessment, and formative assessment of project proposals, completed quality improvement projects and publication success. Twenty-three participants attended the training day with 20 submitting a project proposal (87%). Ten completed quality improvement projects (43%), eight were judged as satisfactory (35%), and four were submitted and accepted for journal publication (17%). Knowledge and confidence in aspects of quality improvement improved during the pilot, while early feedback on project proposals was valued (85.7%). This small study reports modest success in training core medical trainees and general practice specialty trainees in quality improvement. Many gained knowledge of, confidence in and experience of quality improvement, while journal publication was shown to be possible. The development of educational resources to aid quality improvement project completion and mentoring support is necessary if expectations for quality improvement are to be realised. © The Author(s) 2015.

  7. A Complex Approach to UXO Discrimination: Combining Advanced EMI Forward Models and Statistical Signal Processing

    DTIC Science & Technology

    2012-01-01

    discrimination at live-UXO sites. Namely, under this project first we developed and implemented advanced, physically complete forward EMI models such as, the...detection and discrimination at live-UXO sites. Namely, under this project first we developed and implemented advanced, physically complete forward EMI...Shubitidze of Sky Research and Dartmouth College, conceived, implemented , and tested most of the approaches presented in this report. He developed

  8. FUDS Overview and Perspective on DoD Research and Development Needs for Environmental Restoration

    DTIC Science & Technology

    2011-11-01

    end of FY 2018 . Response complete has been achieved on approximately 59% of all projects. Projects within the FUDS program generally have similar...is to achieve RC at 90% of the projects by the end of FY 2018 . Response complete has been achieved on approximately 59% of all projects. Projects...generated pollution which occurred before transfer of property to private owners, or federal, state or local government owners We do not certify that the

  9. [Provision of integrity and reliability in hygienic examination of investment projects for human capital development].

    PubMed

    Tarkhov, P V; Matsenko, A M; Krugliak, A P; Derkach, Zh V

    2012-01-01

    To reach normal competitiveness in world division of labour, investment projects should stimulate development of human capital towards advance of modern technologies and organizational development of all types of labour. At present time there are only separate calculations of certain types of people's health damage and completely disparate matters of damage compensation exceptionally for chemical contamination effects. The purpose of the paper is development of algorithms to provide hygienic welfare of human capital in investment projects. For this purpose in investments assessment and hygienic examination it is necessary to apply complete and comprehensive (systematic) evaluation of all factors that influence human capital welfare and practical hygienic and research institutions should be focused on systematic elimination of possible dangers and risks of investment projects.

  10. Federal Aviation Administration Small Business Innovation Research 5- Year Project Summaries

    DTIC Science & Technology

    1990-02-01

    Completed Project: The project’s two primary objectives were to further develop the technology base for the Slaved Tandem Freewing (STF) Airplance and...margins than conventional airplances , and can meet all applicable airworthiness requirements. Adaitionally, basic design parameters were developed

  11. Food irradiation: Technology transfer in Asia, practical experiences

    NASA Astrophysics Data System (ADS)

    Kunstadt, Peter; Eng, P.

    1993-10-01

    Nordion International Inc., in cooperation with the Thai Office of Atomic Energy for Peace (OAEP) and the Canadian International Development Agency (CIDA) recently completed a unique food irradiation technology transfer project in Thailand. This complete food irradiation technology transfer project included the design and construction of an automatic multipurpose irradiation facility as well as the services of construction and installation management and experts in facility operation, maintenance and training. This paper provides an insight into the many events that led to the succesful conclusion of the world's first complete food irradiation technology transfer project.

  12. 76 FR 27342 - Central Utah Project Completion Act; Notice of Intent To Accept Proposals, Select a Potential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... DEPARTMENT OF THE INTERIOR Central Utah Project Completion Act; Notice of Intent To Accept... Interior. ACTION: Notice. SUMMARY: Current Federal policy encourages non-Federal development of... Interior (Interior), in consultation with the Department of Energy, Western Area Power Administration...

  13. Open Crowdsourcing: Leveraging Community Software Developers for IT Projects

    ERIC Educational Resources Information Center

    Phair, Derek

    2012-01-01

    This qualitative exploratory single-case study was designed to examine and understand the use of volunteer community participants as software developers and other project related roles, such as testers, in completing a web-based application project by a non-profit organization. This study analyzed the strategic decision to engage crowd…

  14. Commercial Drivers License Workplace Literacy Project. Preparatory Course.

    ERIC Educational Resources Information Center

    Minnesota Teamsters Service Bureau, Minneapolis.

    This course syllabus was developed for a workplace literacy project conducted cooperatively through the Minnesota Teamsters Service Bureau and Northeast Metro Technical College. It is part of the job-specific curriculum for commercial truck drivers developed during the project. This guide lists the courses necessary to complete a 24-credit diploma…

  15. Project Success in Agile Development Software Projects

    ERIC Educational Resources Information Center

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  16. Using an Investment Project To Develop Professional Competencies in Introduction to Financial Accounting.

    ERIC Educational Resources Information Center

    Dudley, Lola Woodard; Davis, Henry H.; McGrady, David G.

    2001-01-01

    A group project involves accounting students in hypothetical creation of a stock portfolio after completing financial analyses. The activity develops decision-making, critical thinking, research, communication, and finance skills. (SK)

  17. Development of Advanced Czochralski Growth Process to produce low cost 150 KG silicon ingots from a single crucible for technology readiness

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The modified CG2000 crystal grower construction, installation, and machine check-out was completed. The process development check-out proceeded with several dry runs and one growth run. Several machine calibrations and functional problems were discovered and corrected. Several exhaust gas analysis system alternatives were evaluated and an integrated system approved and ordered. A contract presentation was made at the Project Integration Meeting at JPL, including cost-projections using contract projected throughput and machine parameters. Several growth runs on a development CG200 RC grower show that complete neck, crown, and body automated growth can be achieved with only one operator input. Work continued for melt level, melt temperature, and diameter sensor development.

  18. Augmented Fish Health Monitoring; Volume I of II, Completion Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michak, Patty

    1991-05-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Historically, all agencies involved with fish health in the Columbia Basin were conducting various levels of fish health monitoring, pathogen screening and collection. The goals of this project were; to identify, develop and implement a standardized level of fish health methodologies, develop a common data collection and reporting format in the area of artificial production, evaluate and monitor water quality, improve communications between agencies and provide annual evaluation of fishmore » health information for production of healthier smolts. This completion report will contain a project evaluation, review of the goals of the project, evaluation of the specific fish health analyses, an overview of highlights of the project and concluding remarks. 8 refs., 1 fig., 4 tabs.« less

  19. Action Research Monographs. Complete Set. Pennsylvania Action Research Network, 1998-99. A Section 353 Project of the Pennsylvania Department of Education, Bureau of Adult Basic and Literacy Education. A Learning from Practice Project.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., McKeesport.

    This publication consists of the complete set of 23 monographs developed by the Pennsylvania Action Research Network to supplement the 67 monographs produced over the past 3 years. The specific audience are literacy, General Educational Development (GED), and English-as-a Second Language (ESL) practitioners. The titles are: "Use of…

  20. Engaging Clinical Nurses in Quality Improvement Projects.

    PubMed

    Moore, Susan; Stichler, Jaynelle F

    2015-10-01

    Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.

  1. Development of a Total Energy, Environment and Asset Management (TE2AM tm) Curriculum

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Leary, Phillip R.

    2012-12-31

    The University of Wisconsin Department of Engineering Professional Development (EPD) has completed the sponsored project entitled, Development of a Total Energy, Environment and Asset Management (TE2AM) Curriculum. The project involved the development of a structured professional development program to improve the knowledge, skills, capabilities, and competencies of engineers and operators of commercial buildings. TE2AM advances a radically different approach to commercial building design, operation, maintenance, and end of life disposition. By employing asset management principles to the lifecycle of a commercial building, owners and occupants will realize improved building performance, reduced energy consumption and positive environmental impacts. Through our commercializationmore » plan, we intend to offer TE2AM courses and certificates to the professional community and continuously improve TE2AM course materials. The TE2AM project supports the DOE Strategic Theme 1 Energy Security; and will further advance the DOE Strategic Goal 1.4 Energy Productivity. Through participation in the TE2AM curriculum, engineers and operators of commercial buildings will be eligible for a professional certificate; denoting the completion of a prescribed series of learning activities. The project involved a comprehensive, rigorous approach to curriculum development, and accomplished the following goals: 1. Identify, analyze and prioritize key learning needs of engineers, architects and technical professionals as operators of commercial buildings. 2. Design and develop TE2AM curricula and instructional strategies to meet learning needs of the target learning community. 3. Establish partnerships with the sponsor and key stakeholders to enhance the development and delivery of learning programs. 4. Successfully commercialize and sustain the training and certificate programs for a substantial time following the term of the award. The project team was successful in achieving the goals and deliverables set forth in the original proposal. Though attempts were made to adhere to the original project timeline, the team requested, and was granted a 6 month project extension, during which time the project was completed.« less

  2. A recent Cleanroom success story: The Redwing project

    NASA Technical Reports Server (NTRS)

    Hausler, Philip A.

    1992-01-01

    Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

  3. Project CAREER/CAN. Final Evaluation Report.

    ERIC Educational Resources Information Center

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  4. Piecing the Puzzle: A Framework for Developing Intercultural Online Communication Projects in Business Education

    ERIC Educational Resources Information Center

    Crossman, Joanna; Bordia, Sarbari

    2012-01-01

    Purpose: The purpose of this paper is to present a framework based on lessons learnt from a recently completed project aimed at developing intercultural online communication competencies in business students. Design/methodology/approach: The project entailed collaboration between students and staff in business communication courses from an…

  5. The Proposal Project

    ERIC Educational Resources Information Center

    Pierce, Elizabeth

    2007-01-01

    The proposal project stretches over a significant portion of the semester-long sophomore course Professional Communication (ENG 250) at Monroe Community College. While developing their proposal project, students need to use time management skills to successfully complete a quality project on time. In addition, excellent oral and written…

  6. Designing for Change: Minimizing the Impact of Changing Requirements in the Later Stages of a Spaceflight Software Project

    NASA Technical Reports Server (NTRS)

    Allen, B. Danette

    1998-01-01

    In the traditional 'waterfall' model of the software project life cycle, the Requirements Phase ends and flows into the Design Phase, which ends and flows into the Development Phase. Unfortunately, the process rarely, if ever, works so smoothly in practice. Instead, software developers often receive new requirements, or modifications to the original requirements, well after the earlier project phases have been completed. In particular, projects with shorter than ideal schedules are highly susceptible to frequent requirements changes, as the software requirements analysis phase is often forced to begin before the overall system requirements and top-level design are complete. This results in later modifications to the software requirements, even though the software design and development phases may be complete. Requirements changes received in the later stages of a software project inevitably lead to modification of existing developed software. Presented here is a series of software design techniques that can greatly reduce the impact of last-minute requirements changes. These techniques were successfully used to add built-in flexibility to two complex software systems in which the requirements were expected to (and did) change frequently. These large, real-time systems were developed at NASA Langley Research Center (LaRC) to test and control the Lidar In-Space Technology Experiment (LITE) instrument which flew aboard the space shuttle Discovery as the primary payload on the STS-64 mission.

  7. Teaching qualitative research to BSW students through exposure to aging.

    PubMed

    Sidell, Nancy L

    2007-01-01

    This article describes one rural program's efforts to expose students to gerontology through teaching qualitative research methodology. A collaborative research pilot project was developed with a local nursing home. BSW students worked in two groups to conduct and present qualitative research projects by the course's completion. This article describes the research project and evaluates the project's success from student and instructor viewpoints. Significant differences were found in self-reported student knowledge of key concepts at the project's completion, compared with pre-test knowledge. Student comments revealed value in this teaching approach. Implications for further engaging students in gerontological research are discussed.

  8. Examining Thai high school students' developing STEM projects

    NASA Astrophysics Data System (ADS)

    Teenoi, Kultida; Siripun, Kulpatsorn; Yuenyong, Chokchai

    2018-01-01

    Like others, Thailand education strongly focused on STEM education. This paper aimed to examine existing Thai high school students' integrated knowledge about science, technology, engineering, and mathematics (STEM) in their developing science project. The participants included 49 high school students were studying the subject of individual study (IS) in Khon Kaen wittayayon school, Khon Kaen, Thailand. The IS was provided to gradually enhance students to know how to do science project starting from getting start to do science projects, They enrolled to study the individual study of science project for three year in roll. Methodology was qualitative research. Views of students' integrated knowledge about STEM were interpreted through participant observation, interview, and students' science projects. The first author as participant observation has taught this group of students for 3 years. It found that 16 science projects were developed. Views of students' integrated knowledge about STEM could be categorized into three categories. These included (1) completely indicated integration of knowledge about science, technology, engineering, and mathematics, (2) partial indicated integration of knowledge about science, technology, engineering, and mathematics, and (3) no integration. The findings revealed that majority of science projects could be categorized as completely indicated integration of knowledge about science, technology, engineering, and mathematics. The paper suggested some ideas of enhancing students to applying STEM for developing science projects.

  9. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  10. Workforce development and effective evaluation of projects.

    PubMed

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  11. A Completed Research and Development Work Project in School: The Teachers' Learning and Possibilities, Premises and Challenges for Further Development

    ERIC Educational Resources Information Center

    Postholm, May Britt

    2011-01-01

    The article is based on a follow-up study of a research and development work project with school leaders and teachers conducted in a Norwegian lower secondary school. The purpose is to present an understanding of "what the practitioners find they have learned" during the project and "how they experience the situation with regard to…

  12. 30 CFR 203.64 - How many applications may I file on a field or a development project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How many applications may I file on a field or a development project? 203.64 Section 203.64 Mineral Resources MINERALS MANAGEMENT SERVICE... § 203.64 How many applications may I file on a field or a development project? You may file one complete...

  13. Yield model development project implementation plan

    NASA Technical Reports Server (NTRS)

    Ambroziak, R. A.

    1982-01-01

    Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.

  14. Hualapai Wind Project Feasibility Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davidson, Kevin; Randall, Mark; Isham, Tom

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less

  15. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Will

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less

  16. Brownfields City of Houston Solar Project: Solar Power Analysis and Design Specifications

    EPA Pesticide Factsheets

    This document details the scope of work elements completed in support of this project, as well as recommendations for next steps towards solar project development and power purchase agreement negotiation and finalization.

  17. Development of the Design Laboratory.

    ERIC Educational Resources Information Center

    Silla, Harry

    1986-01-01

    Describes the design laboratory at the Stevens Institute of Technology (SIT). Considers course objectives, design projects, project structure, mechanical design, project management, and laboratory operation. This laboratory complements SIT's course in process design, giving students a complete design experience. (JN)

  18. SSME structural dynamic model development

    NASA Technical Reports Server (NTRS)

    Foley, M. J.; Tilley, D. M.; Welch, C. T.

    1983-01-01

    A mathematical model of the Space Shuttle Main Engine (SSME) as a complete assembly, with detailed emphasis on LOX and High Fuel Turbopumps is developed. The advantages of both complete engine dynamics, and high fidelity modeling are incorporated. Development of this model, some results, and projected applications are discussed.

  19. MO-F-211-01: Methods for Completing Practice Quality Improvement (PQI).

    PubMed

    Johnson, J; Brown, K; Ibbott, G; Pawlicki, T

    2012-06-01

    Practice Quality Improvement (PQI) is becoming an expected part of routine practice in healthcare as an approach to provide more efficient, effective and high quality care. Additionally, as part of the ABR's Maintenance of Certification (MOC) pathway, medical physicists are now expected to complete a PQI project. This session will describe the history behind and benefits of the ABR's MOC program, provide details of quality improvement methods and how to successfully complete a PQI project. PQI methods include various commonly used engineering and management tools. The Plan-Do-Study-Act (PDSA) cycle will be presented as one project planning and implementation tool. Other PQI analysis instruments such as flowcharts, Pareto charts, process control charts and fishbone diagrams will also be explained with examples. Cause analysis, solution development and implementation, and post-implementation measurement will be presented. Project identification and definition as well as appropriate measurement tool selection will be offered. Methods to choose key quality metrics (key quality indicators) will also be addressed. Several sample PQI projects and templates available through the AAPM and other organizations will be described. At least three examples of completed PQI projects will be shared. 1. Identify and define a PQI project 2. Identify and select measurement methods/techniques for use with the PQI project 3. Describe example(s) of completed projects. © 2012 American Association of Physicists in Medicine.

  20. Principle Findings from Development of a Recirculated Exhaust Gas Intake Sensor (REGIS) Enabling Cost-Effective Fuel Efficiency Improvement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schnabel, Claus

    Kick-off of the Bosch scope of work for the REGIS project started in October 2012. The primary work-packages included in the Bosch scope of work were the following: overall project management, development of the EGR sensor (design of sensor element, design of protection tube, and design of mounting orientation), development of EGR system control strategy, build-up of prototype sensors, evaluation of system performance with the new sensor and the new control strategy, long-term durability testing, and development of a 2nd generation sensor concept for continued technology development after the REGIS project. The University of Clemson was a partner with Boschmore » in the REGIS project. The Clemson scope of work for the REGIS project started in June 2013. The primary work-packages included in the Clemson scope of work were the following: development of EGR system control strategy, and evaluation of system performance with the new sensor and new control strategy. This project was split into phase I, phase II and phase III. Phase I work was completed by the end of June 2014 and included the following primary work packages: development of sensor technical requirements, assembly of engine testbench at Clemson, design concept for sensor housing, connector, and mounting orientation, build-up of EGR flow test benches at Bosch, and build-up of first sensor prototypes. Phase II work was completed by the end of June 2015 and included the following primary work pack ages: development of an optimizing function and demonstration of robustness of sensor, system control strategy implementation and initial validation, completion of engine in the loop testing of developed control algorithm, completion of sensor testing including characteristic line, synthetic gas test stand, and pressure dependency characterization, demonstration of benefits of control w/o sensing via simulation, development of 2nd generation sensor concept. Notable technical achievements from phase II were the following: publication of two new technical papers by Clemson detailing the control strategies used for the EGR system control. The two papers was published in the 2016 SAE World Congress in April 2016. The titles of each paper are, “Physics-Based Exhaust Pressure and Temperature Estimation for Low Pressure EGR Control in Turbocharged Gasoline Engines,” by K. Siokos, and “A Control Algorithm for Low Pressure – EGR Systems using a Smith Predictor with Intake Oxygen Sensor Feedback”, by R. Koli. All phase III work packages have been completed. The primary work packages in phase III were the following: completion of long-term sensor durability testing, final demonstration of benefits of EGR control w/o sensing, final decision of the second generation sensor development path.« less

  1. EXOS research on master controllers for robotic devices

    NASA Technical Reports Server (NTRS)

    Marcus, Beth A.; An, Ben; Eberman, Brian

    1992-01-01

    Two projects are currently being conducted by EXOS under the Small Business Innovation Research (SBIR) program with NASA. One project will develop a force feedback device for controlling robot hands, the other will develop an elbow and shoulder exoskeleton which can be integrated with other EXOS devices to provide whole robot arm and hand control. Aspects covered are the project objectives, important research issues which have arisen during the developments, and interim results of the projects. The Phase 1 projects currently underway will result in hardware prototypes and identification of research issues required for complete system development and/or integration.

  2. Evaluating Managerial Styles for System Development Life Cycle Stages to Ensure Software Project Success

    ERIC Educational Resources Information Center

    Kocherla, Showry

    2012-01-01

    Information technology (IT) projects are considered successful if they are completed on time, within budget, and within scope. Even though, the required tools and methodologies are in place, IT projects continue to fail at a higher rate. Current literature lacks explanation for success within the stages of system development life-cycle (SDLC) such…

  3. Selected nursery projects at the Missoula Technology and Development Center

    Treesearch

    Brian Vachowski

    2007-01-01

    The USDA Forest Service Missoula Technology and Development Center (MTDC) offers technical expertise, technology transfer, and new equipment development to federal, state, and private forest nurseries. Current and recently completed projects at MTDC include a container block steam sterilizer, shielded herbicide sprayer, time-domain reflectometry (TDR) nursery soil...

  4. DEVELOPING A COST EFFECTIVE ENVIRONMENTAL SOLUTION FOR PRODUCED WATER AND CREATING A ''NEW'' WATER RESOURCE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glenn Doran

    1997-04-28

    This report summarizes the status of this project for the quarter January 1, 1997 to March 31, 1997. Phase II has been started and Task 7, Develop Pilot Scale Test Work Plan has been completed. The operational portion of this phase, Task 8 has been initiated with several pieces of pilot equipment already on-site. The start up of the full process train will not occur until the next quarter. The project is slightly behind schedule. A no cost extension was requested and was granted. The anticipated completion date is December 31, 1997. The project is on budget.

  5. The Development and Flight Testing of an Aerially Deployed Unmanned Aerial System

    NASA Astrophysics Data System (ADS)

    Smith, Andrew

    An investigation into the feasibility of aerial deployed unmanned aerial vehicles was completed. The investigation included the development and flight testing of multiple unmanned aerial systems to investigate the different components of potential aerial deployment missions. The project consisted of two main objectives; the first objective dealt with the development of an airframe capable of surviving aerial deployment from a rocket and then self assembling from its stowed configuration into its flight configuration. The second objective focused on the development of an autopilot capable of performing basic guidance, navigation, and control following aerial deployment. To accomplish these two objectives multiple airframes were developed to verify their completion experimentally. The first portion of the project, investigating the feasibility of surviving an aerial deployment, was completed using a fixed wing glider that following a successful deployment had 52 seconds of controlled flight. Before developing the autopilot in the second phase of the project, the glider was significantly upgraded to fix faults discovered in the glider flight testing and to enhance the system capabilities. Unfortunately to conform to outdoor flight restrictions imposed by the university and the Federal Aviation Administration it was required to switch airframes before flight testing of the new fixed wing platform could begin. As a result, an autopilot was developed for a quadrotor and verified experimentally completely indoors to remain within the limits of governing policies.

  6. Advances in instrumentation at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Adkins, Sean M.; Armandroff, Taft; Lewis, Hilton; Martin, Chris; McLean, Ian S.; Rockosi, Constance; Wizinowich, Peter

    2010-07-01

    In this paper we describe both recently completed instrumentation projects and our current development efforts in the context of the Observatory's science driven strategic plan which seeks to address key questions in observational astronomy for extra-galactic, Galactic, and planetary science with both seeing limited capabilities and high angular resolution adaptive optics capabilities. This paper will review recently completed projects as well as new instruments in development including MOSFIRE, a near IR multi-object spectrograph nearing completion, a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager, and the Keck Next Generation Adaptive Optics facility and its first light science instrument DAVINCI.

  7. Improving the Automated Detection and Analysis of Secure Coding Violations

    DTIC Science & Technology

    2014-06-01

    eliminating software vulnerabilities and other flaws. The CERT Division produces books and courses that foster a security mindset in developers, and...website also provides a virtual machine containing a complete build of the Rosecheckers project on Linux . The Rosecheckers project leverages the...Compass/ROSE6 project developed at Law- rence Livermore National Laboratory. This project provides a high-level API for accessing the abstract syntax tree

  8. Evaluation of Free To Grow, Phase II: Detailed Profile of the Free To Grow Project in California. Final Report.

    ERIC Educational Resources Information Center

    Harrington, Mary

    The Free to Grow pilot project, developed by the Charles R. Drew University of Medicine and Science and its Head Start project, operated between 1994 and 1999. Following a 2-year planning and development stage, 5 project sites went on to complete the 3-year implementation phase in California, Colorado, Kentucky, New York, and Puerto Rico; the…

  9. 24 CFR 200.54 - Project completion funding.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT GENERAL INTRODUCTION TO FHA PROGRAMS Requirements for Application, Commitment, and... project and to pay the initial service charge, carrying charges, and legal and organizational expenses...

  10. Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency (Case Study: House Type 36)

    NASA Astrophysics Data System (ADS)

    Kholil, Muhammad; Nurul Alfa, Bonitasari; Hariadi, Madjumsyah

    2018-04-01

    Network planning is one of the management techniques used to plan and control the implementation of a project, which shows the relationship between activities. The objective of this research is to arrange network planning on house construction project on CV. XYZ and to know the role of network planning in increasing the efficiency of time so that can be obtained the optimal project completion period. This research uses descriptive method, where the data collected by direct observation to the company, interview, and literature study. The result of this research is optimal time planning in project work. Based on the results of the research, it can be concluded that the use of the both methods in scheduling of house construction project gives very significant effect on the completion time of the project. The company’s CPM (Critical Path Method) method can complete the project with 131 days, PERT (Program Evaluation Review and Technique) Method takes 136 days. Based on PERT calculation obtained Z = -0.66 or 0,2546 (from normal distribution table), and also obtained the value of probability or probability is 74,54%. This means that the possibility of house construction project activities can be completed on time is high enough. While without using both methods the project completion time takes 173 days. So using the CPM method, the company can save time up to 42 days and has time efficiency by using network planning.

  11. EPA Critical Path Science Plan Projects 19, 20 and 21: Human and Bovine Source Detection

    EPA Science Inventory

    The U.S. EPA Critical Path Science Plan Projects are: Project 19: develop novel bovine and human host-specific PCR assays and complete performance evaluation with other published methods. Project 20: Evaluate human-specific assays with water samples impacted with different lev...

  12. Electronic construction collaboration system -- final phase.

    DOT National Transportation Integrated Search

    2014-09-01

    This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as : Attolist) on the Iowa Falls Arch Bridge project and (2) develop a WPMS for projects under $10 million. : For the first maj...

  13. Columbus Closure Project Released without Radiological Restrictions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henderson, G.

    2007-07-01

    The Columbus Closure Project (CCP), a historic radiological research complex, was cleaned up for future use without radiological restriction in 2006. The CCP research and development site contributed to national defense, nuclear fuel fabrication, and the development of safe nuclear reactors in the United States until 1988 when research activities were concluded for site decommissioning. In November of 2003, the Ohio Field Office of the U.S. Department of Energy contracted ECC/E2 Closure Services, LLC (Closure Services) to complete the removal of radioactive contamination from of a 1955 era nuclear sciences area consisting of a large hot cell facility, research reactormore » building and underground piping. The project known as the Columbus Closure Project (CCP) was completed in 27 months and brought to a close 16 years of D and D in Columbus, Ohio. This paper examines the project innovations and challenges presented during the Columbus Closure Project. The examination of the CCP includes the project regulatory environment, the CS safety program, accelerated clean up innovation, project execution strategies and management of project waste issues and the regulatory approach to site release 'without radiological restrictions'. (authors)« less

  14. Design Skills and Prototyping for Defense Systems

    DTIC Science & Technology

    2015-04-30

    however, the utility of prototyping has had a demonstrably mixed record in defense acquisition. Some programs, such as the Manhattan Project , were...almost completely undefined. The first production reactors for the Manhattan Project suffered a near- catastrophic engineering design flaw stemming...architecture, as was seen in the F-117 and Manhattan Project development efforts. Architectural Prototyping Simply maintaining design teams or developing

  15. What's New With Nurseries and Reforestation Projects at the Missoula Technology and Development Center

    Treesearch

    Brian Vachowski

    2006-01-01

    The USDA Forest Service Missoula Technology and Development Center (MTDC) offers technical expertise, technology transfer, and new equipment development to Federal, State, and private forest nurseries. Current and recently completed projects at MTDC include a nursery soil moisture meter, remote data collection systems, low cost weather stations, electronic soil...

  16. USL/DBMS NASA/PC R and D project system design standards

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.

  17. DEVELOPMENT OF NEW DRILLING FLUIDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David B. Burnett

    2003-08-01

    The goal of the project has been to develop new types of drill-in fluids (DIFs) and completion fluids (CFs) for use in natural gas reservoirs. Phase 1 of the project was a 24-month study to develop the concept of advanced type of fluids usable in well completions. Phase 1 tested this concept and created a kinetic mathematical model to accurately track the fluid's behavior under downhole conditions. Phase 2 includes tests of the new materials and practices. Work includes the preparation of new materials and the deployment of the new fluids and new practices to the field. The project addressesmore » the special problem of formation damage issues related to the use of CFs and DIFs in open hole horizontal well completions. The concept of a ''removable filtercake'' has, as its basis, a mechanism to initiate or trigger the removal process. Our approach to developing such a mechanism is to identify the components of the filtercake and measure the change in the characteristics of these components when certain cleanup (filtercake removal) techniques are employed.« less

  18. Project implementation : classification of organic soils and classification of marls - training of INDOT personnel.

    DOT National Transportation Integrated Search

    2012-09-01

    This is an implementation project for the research completed as part of the following projects: SPR3005 Classification of Organic Soils : and SPR3227 Classification of Marl Soils. The methods developed for the classification of both soi...

  19. A Global Health Research Checklist for clinicians.

    PubMed

    Sawaya, Rasha D; Breslin, Kristen A; Abdulrahman, Eiman; Chapman, Jennifer I; Good, Dafina M; Moran, Lili; Mullan, Paul C; Badaki-Makun, Oluwakemi

    2018-04-19

    Global health research has become a priority in most international medical projects. However, it is a difficult endeavor, especially for a busy clinician. Navigating the ethics, methods, and local partnerships is essential yet daunting.To date, there are no guidelines published to help clinicians initiate and complete successful global health research projects. This Global Health Research Checklist was developed to be used by clinicians or other health professionals for developing, implementing, and completing a successful research project in an international and often low-resource setting. It consists of five sections: Objective, Methodology, Institutional Review Board and Ethics, Culture and partnerships, and Logistics. We used individual experiences and published literature to develop and emphasize the key concepts. The checklist was trialed in two workshops and adjusted based on participants' feedback.

  20. Final Technical Report: Renewable Energy Feasibility Study and Resources Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivero, Mariah

    In March 2011, the U.S. Department of Energy (DOE) awarded White Pine County, Nevada, a grant to assess the feasibility of renewable resource-related economic development activities in the area. The grant project included a public outreach and training component and was to include a demonstration project; however, the demonstration project was not completed due to lack of identification of an entity willing to locate a project in White Pine County. White Pine County completed the assessment of renewable resources and a feasibility study on the potential for a renewable energy-focused economic sector within the County. The feasibility study concluded "allmore » resources studied were present and in sufficient quantity and quality to warrant consideration for development" and there were varying degrees of potential economic impact based on the resource type and project size. The feasibility study and its components were to be used as tools to attract potential developers and other business ventures to the local market. White Pine County also marketed the County’s resources to the renewable energy business community in an effort to develop contracts for demonstration projects. The County also worked to develop partnerships with local educational institutions, including the White Pine County School District, conducted outreach and training for the local community.« less

  1. Designing Appropriate Scaffolding for Student Science Projects

    ERIC Educational Resources Information Center

    Johnson, Marie; Smith, Mark

    2008-01-01

    The authors have developed a successful approach to teaching and inspiring undergraduate science and nonscience majors to complete creditable, semester-long, hands-on science research projects. This approach utilizes a carefully developed scaffolding consisting of in-class exercises and discussions, preparatory homework and lab events, and three…

  2. 24 CFR 990.280 - Project-based budgeting and accounting.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... all data needed to complete project-based financial statements in accordance with Accounting... accounting. 990.280 Section 990.280 Housing and Urban Development Regulations Relating to Housing and Urban... budgeting and accounting. (a) All PHAs covered by this subpart shall develop and maintain a system of...

  3. The Application of Project Management Techniques to College and University Admissions Activities.

    ERIC Educational Resources Information Center

    Bickers, Doyle

    1993-01-01

    The process of project management is illustrated through application to one activity, development of a new brochure, within the admissions program of a fictional college. The project life cycle is described, and a work responsibility schedule, project completion schedule, and critical path chart are used as planning and implementation tools. (MSE)

  4. NASA's TReK Project: A Case Study in Using the Spiral Model of Software Development

    NASA Technical Reports Server (NTRS)

    Hendrix, T. Dean; Schneider, Michelle P.

    1998-01-01

    Software development projects face numerous challenges that threaten their successful completion. Whether it is not enough money, too little time, or a case of "requirements creep" that has turned into a full sprint, projects must meet these challenges or face possible disastrous consequences. A robust, yet flexible process model can provide a mechanism through which software development teams can meet these challenges head on and win. This article describes how the spiral model has been successfully tailored to a specific project and relates some notable results to date.

  5. Development and participant assessment of a practical quality improvement educational initiative for surgical residents.

    PubMed

    Sellers, Morgan M; Hanson, Kristi; Schuller, Mary; Sherman, Karen; Kelz, Rachel R; Fryer, Jonathan; DaRosa, Debra; Bilimoria, Karl Y

    2013-06-01

    As patient-safety and quality efforts spread throughout health care, the need for physician involvement is critical, yet structured training programs during surgical residency are still uncommon. Our objective was to develop an extended quality-improvement curriculum for surgical residents that included formal didactics and structured practical experience. Surgical trainees completed an 8-hour didactic program in quality-improvement methodology at the start of PGY3. Small teams developed practical quality-improvement projects based on needs identified during clinical experience. With the assistance of the hospital's process-improvement team and surgical faculty, residents worked through their selected projects during the following year. Residents were anonymously surveyed after their participation to assess the experience. During the first 3 years of the program, 17 residents participated, with 100% survey completion. Seven quality-improvement projects were developed, with 57% completing all DMAIC (Define, Measure, Analyze, Improve, Control) phases. Initial projects involved issues of clinical efficiency and later projects increasingly focused on clinical care questions. Residents found the experience educationally important (65%) and believed they were well equipped to lead similar initiatives in the future (70%). Based on feedback, the timeline was expanded from 12 to 24 months and changed to start in PGY2. Developing an extended curriculum using both didactic sessions and applied projects to teach residents the theory and implementation of quality improvement is possible and effective. It addresses the ACGME competencies of practice-based improvement and learning and systems-based practice. Our iterative experience during the past 3 years can serve as a guide for other programs. Copyright © 2013 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  6. Read to Eat: A Teaching Strategy.

    ERIC Educational Resources Information Center

    Eshelman, Martha

    1988-01-01

    Teachers may use classroom cooking projects to encourage students to read. While developing basic reading skills, students also learn to follow directions and to cooperate in a group project. Three sample recipes are given. The article outlines steps to successfully complete a classroom cooking project. (JL)

  7. 40 CFR 57.603 - Criteria for approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...

  8. 40 CFR 57.603 - Criteria for approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...

  9. 40 CFR 57.603 - Criteria for approval.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...

  10. 40 CFR 57.603 - Criteria for approval.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...

  11. 24 CFR 213.256 - Premiums; insurance upon completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Premiums; insurance upon completion... HOUSING AND URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES COOPERATIVE HOUSING MORTGAGE INSURANCE Contract Rights and Obligations-Projects § 213.256 Premiums...

  12. New developments in instrumentation at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Adkins, Sean M.; Armandroff, Taft E.; Fitzgerald, Michael P.; Johnson, James; Larkin, James E.; Lewis, Hilton A.; Martin, Christopher; Matthews, Keith Y.; Prochaska, J. X.; Wizinowich, Peter

    2014-07-01

    The W. M. Keck Observatory continues to develop new capabilities in support of our science driven strategic plan which emphasizes leadership in key areas of observational astronomy. This leadership is a key component of the scientific productivity of our observing community and depends on our ability to develop new instrumentation, upgrades to existing instrumentation, and upgrades to supporting infrastructure at the observatory. In this paper we describe the as measured performance of projects completed in 2014 and the expected performance of projects currently in the development or construction phases. Projects reaching completion in 2014 include a near-IR tip/tilt sensor for the Keck I adaptive optics system, a new center launch system for the Keck II laser guide star facility, and NIRES, a near-IR Echelle spectrograph for the Keck II telescope. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager, a deployable tertiary mirror for the Keck I telescope, upgrades to the spectrograph detector and the imager of the OSIRIS instrument, and an upgrade to the telescope control systems on both Keck telescopes.

  13. Choosing and Developing the Right Leadership Styles for Projects

    NASA Technical Reports Server (NTRS)

    Mueller, Ralf

    2008-01-01

    Analyzing extensive questionnaires completed by 400 project management professionals, Professor Rodney Turner of the Lille Graduate School of Management and I have identified competencies that contribute significantly to project management success. Our research helps define the managerial and emotional competencies needed to make projects work. We also found that different kinds of projects call for different combinations of competencies.

  14. Lower Klickitat Riparian and In-channel Habitat Restoration Project; Klickitat Watershed Enhancement, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conley, Will

    2004-01-01

    The overall goal of the Klickitat Watershed Enhancement Project (KWEP) is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of stream reaches and watersheds supporting native anadromous fish production, particularly steelhead (Oncorhyncus mykiss; ESA- listed as 'Threatened' within the Mid-Columbia ESU) and spring Chinook (O. tshawytscha). Habitat restoration activities in the Klickitat subbasin augment goals and objectives of the Yakima Klickitat Fisheries Project (YKFP), NPPC Fish and Wildlife Program, Klickitat Subbasin Summary and the NMFS Biological Opinion (All-H paper). Work is conducted to enhance instream andmore » contributing upland habitat to facilitate increased natural production potential for native salmonid stocks. Efforts in the Klickitat Subbasin fall into two main categories: (1) identification and prioritization of sites for protection and restoration activities, (2) implementation of protection and restoration measures. KWEP personnel also assist monitoring efforts of the YKFP Monitoring & Evaluation Project. During the September 2002-August 2003 reporting period, KWEP personnel continued efforts to address feedback from the August 2000 Provincial Review that indicated a need for better information management and development of geographic priorities by: (1) Assisting development of the Strategic Habitat Plan for the Klickitat Lead Entity (Task A3.1) and Klickitat steelhead EDT model (Task A4.1); (2) Improving the functionality of reference point, habitat unit, and large woody debris modules of the habitat database as well as addition of a temperature module (Tasks A1.1-1.2); (3) Continuing development and acquisition of GIS data (Task A1.3); (4) Ongoing data collection efforts to fill information gaps including streamflow, habitat, and temperature (Objectives C1 and C2); and (5) Completion of planning, field work, and hydrologic modeling associated with roads assessment in the White Creek watershed (Task A4.2). Significant milestones associated with restoration projects during the reporting period included: (1) Completion of the Surveyors Fish Creek Passage Enhancement project (Task B2.3); (2) Completion of interagency agreements for the Klickitat Meadows (Task B2.4) and Klickitat Mill (Task B2.10) projects; (3) Completion of topographic surveys for the Klickitat Meadows (Task B2.4), Klickitat River Meadows (Task B2.5), Trout Creek and Bear Creek culvert replacements (Task B2.7), and Snyder Swale II (Task B2.13) projects; (4) Completion of the Snyder Swale II - Phase 1 project (Task B2.13); (5) Completion of design, planning, and permitting for the Klickitat Mill project (Task B2.10) and initiation of construction; (6) Design for the Trout and Bear Creek culverts (B2.7) were brought to the 60% level; and (7) Completion of design work for the for the Klickitat Meadows (Task B2.4) and Klickitat River Meadows (Task B2.5) projects.« less

  15. Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stenner, Robert D.

    2005-09-28

    Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

  16. Continued Development of Curriculum for Interpreter Training Programs in Vocational Education. Final Report, July 1, 1980 - June 30, 1981.

    ERIC Educational Resources Information Center

    Texas State Technical Inst., Waco.

    A project was undertaken to continue development of a curriculum for training interpreters for deaf persons enrolled in vocational education programs in Texas. Utilizing field consultants for specialized course development, project staff completed 11 interpreting modules and accompanying audiovisual prototypes. In addition, on-site visits were…

  17. What's new with nurseries and reforestation projects at the Missoula Technology and Development Center?

    Treesearch

    Bob Simonson

    2011-01-01

    The USDA Forest Service Missoula Technology and Development Center (MTDC) offers technical expertise, technology transfer, and new equipment development to federal, state, and private forest nurseries. Current and recently completed projects at MTDC include a front and mid-mount tractor evaluation, ATV-pulled mechanical tree planter, greenhouse snow remover, freeze...

  18. Acquisition and production of skilled behavior in dynamic decision-making tasks

    NASA Technical Reports Server (NTRS)

    Kirlik, Alex

    1993-01-01

    Summaries of the four projects completed during the performance of this research are included. The four projects described are: Perceptual Augmentation Aiding for Situation Assessment, Perceptual Augmentation Aiding for Dynamic Decision-Making and Control, Action Advisory Aiding for Dynamic Decision-Making and Control, and Display Design to Support Time-Constrained Route Optimization. Papers based on each of these projects are currently in preparation. The theoretical framework upon which the first three projects are based, Ecological Task Analysis, was also developed during the performance of this research, and is described in a previous report. A project concerned with modeling strategies in human control of a dynamic system was also completed during the performance of this research.

  19. Forecasting the impacts of shale gas developments on public health and transportation systems on both sides of the Mexico-U.S. border.

    DOT National Transportation Integrated Search

    2015-08-01

    The activities completed for this project includes the literature research on the Eagle Ford formation, the review : of public-health and transportation related variables to shale gas developments, and the definition of the project : collaborative si...

  20. Fleet management performance monitoring.

    DOT National Transportation Integrated Search

    2013-05-01

    The principle goal of this project was to enhance and expand the analytical modeling methodology previously developed as part of the Fleet Management Criteria: Disposal Points and Utilization Rates project completed in 2010. The enhanced and ex...

  1. Evaluation of rubblization project in Ohio.

    DOT National Transportation Integrated Search

    2011-03-01

    This study was initiated to systematically analyze the performance characteristics of ODOTs completed rubblization and roll (R/R) projects and to develop guidelines regarding improved specifications. : The study was conducted in three parts namely...

  2. Phase III : GIS for the Appalachian Development Highway System 2007 cost to complete estimate

    DOT National Transportation Integrated Search

    2008-02-01

    The proposed research will create an ADHS GIS for integrating and disseminating GIS and transportation data that will increase the accuracy and efficiency associated with completing the 2007 ADHS Cost to Complete Estimate. This project will create ap...

  3. Infusing Evaluative Thinking as Process Use: The Case of the International Development Research Centre (IDRC)

    ERIC Educational Resources Information Center

    Carden, Fred; Earl, Sarah

    2007-01-01

    Until the recent introduction of a dynamic interview-based process, the International Development Research Centre (IDRC), a Canadian development research funding agency, faced a challenge: project completion reports (PCRs) were not being completed in a timely and quality manner. This is a common problem many organizations face in completing…

  4. Staging a Reflective Capstone Course to Transition PharmD Graduates to Professional Life

    PubMed Central

    Hobson, Eric H.; Spinelli, Alisa J.

    2015-01-01

    Objective. To develop and implement a capstone course that would allow students to reflect on their development as a professional, assess and share their achievement of the college’s outcomes, complete a professional portfolio, establish a continuing professional development plan, and prepare to enter the pharmacy profession. Design. Students were required to complete a hybrid course built around 4 online and inclass projects during the final semester of the curriculum. Assessment. Faculty used direct measures of learning, such as reading student portfolios and program outcome reflections, evaluating professional development plans, and directly observing each student in a video presentation. All projects were evaluated using standardized rubrics. Since 2012, all graduating students met the course’s minimum performance requirements. Conclusion. The course provided an opportunity for student-based summative evaluation, direct observation of student skills, and documentation of outcome completion as a means of evaluating readiness to enter the profession. PMID:25741030

  5. Development of a case tool to support decision based software development

    NASA Technical Reports Server (NTRS)

    Wild, Christian J.

    1993-01-01

    A summary of the accomplishments of the research over the past year are presented. Achievements include: made demonstrations with DHC, a prototype supporting decision based software development (DBSD) methodology, for Paramax personnel at ODU; met with Paramax personnel to discuss DBSD issues, the process of integrating DBSD and Refinery and the porting process model; completed and submitted a paper describing DBSD paradigm to IFIP '92; completed and presented a paper describing the approach for software reuse at the Software Reuse Workshop in April 1993; continued to extend DHC with a project agenda, facility necessary for a better project management; completed a primary draft of the re-engineering process model for porting; created a logging form to trace all the activities involved in the process of solving the reengineering problem, and developed a primary chart with the problems involved by the reengineering process.

  6. Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 2nd interim report.

    DOT National Transportation Integrated Search

    1995-02-01

    This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586 00. This was a complete recon...

  7. Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 1st interim report.

    DOT National Transportation Integrated Search

    1993-05-01

    This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586.00. This was a complete recon...

  8. 78 FR 21126 - Agency Forms Undergoing Paperwork Reduction Act Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... aims of this project NIOSH has developed a survey designed to collect information about work history..., which will significantly enhance the existing JEMs and develop a survey questionnaire for asthma in... completed using data exclusively from this survey. While aim 2 will be completed using asthma outcome data...

  9. Identification of genes in anonymous DNA sequences. Final report: Report period, 15 April 1993--15 April 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fields, C.A.

    1994-09-01

    This Report concludes the DOE Human Genome Program project, ``Identification of Genes in Anonymous DNA Sequence.`` The central goals of this project have been (1) understanding the problem of identifying genes in anonymous sequences, and (2) development of tools, primarily the automated identification system gm, for identifying genes. The activities supported under the previous award are summarized here to provide a single complete report on the activities supported as part of the project from its inception to its completion.

  10. 77 FR 28606 - Agency Information Collection Activities: Proposed Collection: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... of both competitive programs will need to complete non-competing continuation (NCC) progress reports...-year project periods. Development Grant recipients will be required to complete one NCC to secure the...

  11. Constructions for Children: Projects in Design Technology.

    ERIC Educational Resources Information Center

    Eichelberger, Barbara; Larson, Connie

    This book helps children develop the capability and confidence to design, construct, and evaluate working models. Projects in this book are suitable for students in grades K-4, but may be adapted for older students. Step-by-step explanations for each project are meant as guidelines and completion of the project is not limited to a single correct…

  12. Bilingual Education and Academic/Career Outreach for Newcomers: Project BEACON, 1988-89. Evaluation Section Report. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Gritzer, Glenn

    The Bilingual Education Academic/Career Outreach for Newcomers Program (Project BEACON) completed its fourth year. The goals of Project BEACON are to facilitate acquisition of English proficiency, develop native language literacy skills, and provide instruction in bilingual and English content area/vocational classes. The project served 753…

  13. Strategies from bedside nurse perspectives in conducting evidence-based practice projects to improve care.

    PubMed

    Shaffer, Susan T; Zarnowsky, Colleen D; Green, Renee C; Lim, Mei-Lin Chen; Holtzer, Brenda M; Ely, Elizabeth A

    2013-06-01

    This article presents the bedside nurses' perspectives on their experience with conducting an evidence based practice project. This is especially important in the climate of hospitals working to achieve Magnet Recognition. The facilitators and barriers to project design and completion are discussed in detail. Strategies to overcome barriers are presented. Facilitators for bedside nurses include motivation and professional development. Most common barriers were lack of time and limited knowledge about the process. Interventions aimed at research utilization can be successful when mindful of commonly understood barriers to project completion with steps taken to resolve those barriers. Copyright © 2013 Elsevier Inc. All rights reserved.

  14. An Immunized Aircraft Maneuver Selection System

    NASA Technical Reports Server (NTRS)

    Karr, Charles L.

    2003-01-01

    The objective of this project, as stated in the original proposal, was to develop an immunized aircraft maneuver selection (IAMS) system. The IAMS system was to be composed of computational and informational building blocks that resemble structures in natural immune systems. The ultimate goal of the project was to develop a software package that could be flight tested on aircraft models. This report describes the work performed in the first year of what was to have been a two year project. This report also describes efforts that would have been made in the final year to have completed the project, had it been continued for the final year. After introductory material is provided in Section 2, the end-of-year-one status of the effort is discussed in Section 3. The remainder of the report provides an accounting of first year efforts. Section 4 provides background information on natural immune systems while Section 5 describes a generic ar&itecture developed for use in the IAMS. Section 6 describes the application of the architecture to a system identification problem. Finally, Section 7 describes steps necessary for completing the project.

  15. The MERMAID project

    NASA Technical Reports Server (NTRS)

    Cowderoy, A. J. C.; Jenkins, John O.; Poulymenakou, A

    1992-01-01

    The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

  16. Development of moored oceanographic spectroradiometer

    NASA Technical Reports Server (NTRS)

    Booth, Charles R.; Mitchell, B. Greg; Holm-Hansen, O.

    1987-01-01

    Biospherical Instruments has successfully completed a NASA sponsored SBIR (Small Business Innovational Research Program) project to develop spectroradiometers capable of being deployed in the ocean for long periods of time. The completion of this project adds a valuable tool for the calibration of future spaceborne ocean color sensors and enables oceanographers to extend remote sensing optical techniques beyond the intermittent coverage of spaceborne sensors. Highlights of the project include two moorings totalling 8 months generating extensive sets of optical, biological, and physical data sets in the ocean off La Jolla, California, and a 70 day operational deployment of the resulting commercial product by the ONR and NASA sponsored BIOWATT program. Based on experience gained in these moorings, Biospherical Instruments has developed a new line of spectroradiometers designed to support the oceanographic remote sensing missions of NASA, the Navy, and various oceanographers.

  17. TxDOT administration research : tasks completed FY2010.

    DOT National Transportation Integrated Search

    2011-02-01

    This research project evaluates numerous transportation issues and develops findings and/or : recommendations based on results. This project has been structured to address some of the emerging, critical, : and unique considerations related to transpo...

  18. TxDOT administration research : tasks completed FY 2012.

    DOT National Transportation Integrated Search

    2012-10-01

    This research project evaluates numerous transportation issues and develops findings and/or recommendations based on results. This project has been structured to address some of the emerging, critical, and unique considerations related to transportat...

  19. TxDOT administration research : tasks completed FY2011.

    DOT National Transportation Integrated Search

    2012-04-01

    This research project evaluates numerous transportation issues and develops findings and/or recommendations based on results. This project has been structured to address some of the emerging, critical, and unique considerations related to transportat...

  20. Theoretical framework of the causes of construction time and cost overruns

    NASA Astrophysics Data System (ADS)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  1. An assessment of collections at the University of Wisconsin-Madison Health Sciences Libraries: drug resistance.

    PubMed

    Bergen, P L; Nemec, D

    1999-01-01

    In December 1997, the authors completed an in-depth collection assessment project at the University of Wisconsin-Madison Health Sciences Libraries. The purpose was to develop a framework for future collection assessment projects by completing a multifaceted evaluation of the libraries' monograph and serial collections in the subject area of drug resistance. Evaluators adapted and synthesized several traditional collection assessment tools, including shelflist measurement, bibliography and standard list checking, and citation analysis. Throughout the project, evaluators explored strategies to overcome some of the problems inherent in the application of traditional collection assessment methods to the evaluation of biomedical collections. Their efforts resulted in the identification of standard monographs and core journals for the subject area, a measurement of the collections' strength relative to the collections of benchmark libraries, and a foundation for future collection development within the subject area. The project's primary outcome was a collection assessment methodology that has potential application to both internal and cooperative collection development in medical, pharmaceutical, and other health sciences libraries.

  2. The Camp Hill Project: Objectives and Design

    ERIC Educational Resources Information Center

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  3. Frequently Asked Questions | NREL

    Science.gov Websites

    technology partnership agreements include: Agreements for commercializing a technology when a partner seeks research and development agreements when a partner and the lab intend to collaborate on a project Strategic partnership projects agreements when a partner seeks technical services to complete a project but does not

  4. 24 CFR 266.310 - Insurance of advances or insurance upon completion; applicability of requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Processing, Development, and Approval § 266.310 Insurance of... projects involving new construction or substantial rehabilitation. Existing projects without the need for...

  5. Machine Shop Projects. Instructor Guide. General Information.

    ERIC Educational Resources Information Center

    Westbrook, Raymond E.

    Developed in Georgia, this manual contains 101 projects for use in machine shop courses, arranged according to a suggested machine shop curriculum. Each project, included in a student workbook, contains complete drawings and instructions for implementation. Tasks are listed under the broad headings of measuring, layout, bench work, saws, drilling,…

  6. User systems guidelines for software projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abrahamson, L.

    1986-04-01

    This manual presents guidelines for software standards which were developed so that software project-development teams and management involved in approving the software could have a generalized view of all phases in the software production procedure and the steps involved in completing each phase. Guidelines are presented for six phases of software development: project definition, building a user interface, designing software, writing code, testing code, and preparing software documentation. The discussions for each phase include examples illustrating the recommended guidelines. 45 refs. (DWL)

  7. Using guided inquiry and the information search process to develop research confidence among first year anatomy students.

    PubMed

    Bentley, Danielle Christine; Robinson, Andrea Cristina; Ruscitti, Robert Joseph

    2015-01-01

    With the growing volume of obtainable medical information and scientific literature, it is crucial that students in the field of allied health professions develop and refine the research skill set necessary to effectively find, retrieve, analyze, and use this information. This skill set can be effectively developed using student inquiry; an active learning process where students answer questions using research and data analysis. Therefore, with the pedagogical goal of developing information literacy among a cohort of allied health professional trainees, first year students studying human anatomy completed inquiry-based projects that were structured within the framework of the Information Search Process. This article thoroughly describes the conceptualization, creation, improvement, implementation, and assessment of the projects beginning with version one, the Student Inquiry Projects. Following a pilot of the Student Inquiry Projects various evidence-based improvements resulted in the final project version called the Inquiry Guided Learning Projects (IGLPs). A full assessment of the IGLPs revealed that students' self-perceived confidence improved for all tested research skills including: research question development, research question selection, exploration of peer-review literature, acquisition of resources, effective communication of results, and literature citation (all P < 0.05). Furthermore, six months following project completion students retained improved confidence in research question development and effective communication of results, with 90% of students indicating the IGLPs were directly responsible for these improvements. By guiding students through the Information Search Process, the IGLPs successfully developed research confidence among allied health trainees. © 2015 American Association of Anatomists.

  8. 2010-11 Research Portfolio: Research & Development Division

    ERIC Educational Resources Information Center

    Educational Testing Service, 2010

    2010-01-01

    This document describes the breadth of the research that the ETS (Educational Testing Service) Research & Development division is conducting in 2010. This portfolio will be updated in early 2011 to reflect changes to existing projects and new projects that were added after this document was completed. The research described in this portfolio falls…

  9. Designing Undergraduate Research Experiences: A Multiplicity of Options

    NASA Astrophysics Data System (ADS)

    Manduca, C. A.

    2001-12-01

    Research experiences for undergraduate students can serve many goals including: developing student understanding of the process of science; providing opportunities for students to develop professional skills or test career plans; completing publishable research; enabling faculty professional development; or enhancing the visibility of a science program. The large range of choices made in the design of an undergraduate research program or opportunity must reflect the goals of the program, the needs and abilities of the students and faculty, and the available resources including both time and money. Effective program design, execution, and evaluation can all be enhanced if the goals of the program are clearly articulated. Student research experiences can be divided into four components: 1) defining the research problem; 2) developing the research plan or experiment design; 3) collecting and interpreting data, and 4) communicating results. In each of these components, the program can be structured in a wide variety of ways and students can be given more or less guidance or freedom. While a feeling of ownership of the research project appears to be very important, examples of successful projects displaying a wide range of design decisions are available. Work with the Keck Geology Consortium suggests that four strategies can enhance the likelihood of successful student experiences: 1) students are well-prepared for research experience (project design must match student preparation); 2) timelines and events are structured to move students through intermediate goals to project completion; 3) support for the emotional, financial, academic and technical challenges of a research project is in place; 4) strong communications between students and faculty set clear expectations and enable mid-course corrections in the program or project design. Creating a research culture for the participants or embedding a project in an existing research culture can also assist students in completing a successful research experience. Outstanding undergraduate research experiences can take place in a wide variety of settings and serve a wide variety of student and faculty needs if projects are designed with these goals in mind.

  10. Renewable Energy Feasibility Study Leading to Development of the Native Spirit Solar Energy Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carolyn Stewart; Tracey LeBeau

    2008-01-31

    DOE-funded renewable energy feasibility study conducted by Red Mountain Tribal Energy on behalf of the Southwest Tribal Energy Consortium (SWTEC). During the course of the study, SWTEC members considered multiple options for the organization structure, selected a proposed organization structure, and drafted a Memorandum of Understanding for the SWTEC organization. High-level resource assessments for SWTEC members were completed; surveys were developed and completed to determine each member’s interest in multiple participation options, including on-reservation projects. With the survey inputs in mind, multiple energy project options were identified and evaluated on a high-level basis. That process led to a narrowing ofmore » the field of technology options to solar generation, specifically, utility-scale Concentrating Solar-Powered Generation projects, with a specific, tentative project location identified at the Fort Mojave Indian Reservation -- the Native Spirit Solar Energy Facility.« less

  11. Software Effort Estimation Accuracy: A Comparative Study of Estimations Based on Software Sizing and Development Methods

    ERIC Educational Resources Information Center

    Lafferty, Mark T.

    2010-01-01

    The number of project failures and those projects completed over cost and over schedule has been a significant issue for software project managers. Among the many reasons for failure, inaccuracy in software estimation--the basis for project bidding, budgeting, planning, and probability estimates--has been identified as a root cause of a high…

  12. News & Views Evaluation of Projects for Basic Research of Scientific Instruments in 2008 Completed NSFC Former President Tang Ao-qing Passed Away Professor Tang Aoqing and NSFC Carbon Nanotube Film-Based Speaker Developed in Tsinghua University Dinosaur Footprint Fossils Discovered in Xinjiang New Method for Early Cancer Diagnosis New Progress Achieved by NSFC Project in Basic Research of Black Hole Physics New progress in Organic FET 67 NSFC-RFBR Cooperative Projects Approved for 2008 Spin Configuration and Super-exchange Mechanism in Molecular Magnets Observed NSFC Strengthens its Funding in Wenchuan Concerns Go to Disaster's Impact on Economy and Emergency Response Thirty-seven NSFC-KOSEF Cooperative Projects Approved

    NASA Astrophysics Data System (ADS)

    2008-01-01

    Evaluation of Projects for Basic Research of Scientific Instruments in 2008 Completed NSFC Former President Tang Ao-qing Passed Away Professor Tang Aoqing and NSFC Carbon Nanotube Film-Based Speaker Developed in Tsinghua University Dinosaur Footprint Fossils Discovered in Xinjiang New Method for Early Cancer Diagnosis New Progress Achieved by NSFC Project in Basic Research of Black Hole Physics New progress in Organic FET 67 NSFC-RFBR Cooperative Projects Approved for 2008 Spin Configuration and Super-exchange Mechanism in Molecular Magnets Observed NSFC Strengthens its Funding in Wenchuan Concerns Go to Disaster's Impact on Economy and Emergency Response Thirty-seven NSFC-KOSEF Cooperative Projects Approved

  13. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less

  14. The Clinical Quality Fellowship Program: Developing Clinical Quality Leadership in the Greater New York Region.

    PubMed

    Bhalla, Rohit; Jalon, Hillary S; Ryan, Lorraine

    The Institute of Medicine has noted that a key factor underlying patient safety problems in the United States is a paucity of quality and safety training programs for clinicians. The Greater New York Hospital Association and United Hospital Fund created the Clinical Quality Fellowship Program (CQFP) to develop quality improvement leaders in the New York region. The goals of this article are to describe the CQFP's structure and curriculum, program participants' perceived value, improvement projects, and career paths. Eighty-seven participants completed the CQFP from 2010 to 2014. Among program participants completing self-assessment evaluations, significant improvements were observed across all quality improvement skill areas. Capstone project categories included inpatient efficiency, transitional care, and hospital infection. Fifty-six percent of participants obtained promotions following program completion. A training program emphasizing diverse curricular elements, varied learning approaches, and applied improvement projects increased participants' self-perceived skills, generated diverse improvement initiatives, and was associated with career advancement.

  15. TPS In-Flight Health Monitoring Project Progress Report

    NASA Technical Reports Server (NTRS)

    Kostyk, Chris; Richards, Lance; Hudston, Larry; Prosser, William

    2007-01-01

    Progress in the development of new thermal protection systems (TPS) is reported. New approaches use embedded lightweight, sensitive, fiber optic strain and temperature sensors within the TPS. Goals of the program are to develop and demonstrate a prototype TPS health monitoring system, develop a thermal-based damage detection algorithm, characterize limits of sensor/system performance, and develop ea methodology transferable to new designs of TPS health monitoring systems. Tasks completed during the project helped establish confidence in understanding of both test setup and the model and validated system/sensor performance in a simple TPS structure. Other progress included complete initial system testing, commencement of the algorithm development effort, generation of a damaged thermal response characteristics database, initial development of a test plan for integration testing of proven FBG sensors in simple TPS structure, and development of partnerships to apply the technology.

  16. Project AHEAD. A New Program in Cooperative Education.

    ERIC Educational Resources Information Center

    Army Recruiting Command, Fort Sheridan, IL.

    Project AHEAD (Army Help for Education and Development) is a program carried out by hundreds of participating colleges and universities to aid veterans and current military personnel in completing their education. The project can be used by recruiters to encourage volunteers to prepare for their personal futures as well as for their military…

  17. Applying Project Management Strategies in a Large Curriculum Conversion Project in Higher Education

    ERIC Educational Resources Information Center

    Gardner, Joel; Bennett, Patrick A.; Hyatt, Niccole; Stoker, Kevin

    2017-01-01

    Higher education is undergoing great changes that require universities to adapt quickly, and making these changes can be difficult. One discipline that can aid in executing change is project management, which has developed a set of clear processes and strategies for completing initiatives quickly and effectively. Several authors have identified…

  18. Targeted On-Demand Team Performance App Development

    DTIC Science & Technology

    2018-02-01

    ACCOMPLISHMENTS: Major Goals Task Description Status 1 Project Management Administration, oversight and management of all program tasks, expenditures...reporting charts, financial and project management protocols. Create, complete, and submit all documentation for program office and designated... project provided? All subjects participated in simulated emergency medicine events that included concurrent management of three patients with

  19. Youth Research Centre Annual Report, 2002.

    ERIC Educational Resources Information Center

    Melbourne Univ. (Australia). Youth Research Centre.

    This report details the activities of the Youth Research Centre (YRC) at the University of Melbourne in 2002 in research project work involving a balance between the completion of projects, the development of new areas, and the continuation of longer-term projects as well as the supervision and teaching of a range of postgraduate health and…

  20. THE DEVELOPMENT OF A QUALITY ASSURANCE PROJECT PLAN FOR THE U.S. EPA DIOXIN EXPOSURE INITIATIVE PROGRAM

    EPA Science Inventory

    All projects planned and implemented under the EPA Dioxin Exposure Initiative (DEI) are required to have completed Quality Assurance Project Plans (QAPPs) EPA Order 5360.1 A2 states, All work funded by the United States Environmental Protection Agency (EPA) that involves the ...

  1. Complete Statistical Survey Results of 1982 Texas Competency Validation Project.

    ERIC Educational Resources Information Center

    Rogers, Sandra K.; Dahlberg, Maurine F.

    This report documents a project to develop current statewide validated competencies for auto mechanics, diesel mechanics, welding, office occupations, and printing. Section 1 describes the four steps used in the current competency validation project and provides a standardized process for conducting future studies at the local or statewide level.…

  2. High Impact Anti-Crime Program: A Framework for Assessing Project-Level Evaluation Plans.

    ERIC Educational Resources Information Center

    Kupersmith, Gerrie

    The pamphlet describes an evaluation model for crime reduction projects developed by National Institute of Law Enforcement and Criminal Justice sponsored research. It is meant to assist justice agency and project managers in determining completeness of evaluation planning by providing a framework against which to measure their evaluation…

  3. Tracking and data systems support for the Helios project. Volume 1: Project development through end of mission, phase 2

    NASA Technical Reports Server (NTRS)

    Goodwin, P. S.; Traxler, M. R.; Meeks, W. G.; Flanagan, F. M.

    1976-01-01

    The overall evolution of the Helios Project is summarized from its conception through to the completion of the Helios-1 mission phase 2. Beginning with the project objectives and concluding with the Helios-1 spacecraft entering its first superior conjunction (end of mission phase 2), descriptions of the project, the mission and its phases, international management and interfaces, and Deep Space Network-spacecraft engineering development in telemetry, tracking, and command systems to ensure compatibility between the U.S. Deep Space Network and the German-built spacecraft are included.

  4. Cal Poly Space Project G-279

    NASA Technical Reports Server (NTRS)

    Farley, David R.

    1987-01-01

    The Cal Poly Space Project is an effort on the part of several highly motivated students to deploy a space canister which will examine the effects of microgravity on electroplating and immiscible metals. The experiments will be controlled and monitored by a specialized triple redundancy system developed to defer the possible electronic errors due to uncontrollable factors such as photons from the Sun. With the finalization of the payload design and the near completion of the data control system, the integration phase of the project is anticipated to be completed and the project ready for launching by early 1987. It is hoped that the experiments will lead to new insights in space research and also prove profitable to industry.

  5. Green Infrastructure Models and Tools

    EPA Science Inventory

    The objective of this project is to modify and refine existing models and develop new tools to support decision making for the complete green infrastructure (GI) project lifecycle, including the planning and implementation of stormwater control in urban and agricultural settings,...

  6. Advances in instrumentation at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Adkins, Sean M.; Armandroff, Taft E.; Johnson, James; Lewis, Hilton A.; Martin, Christopher; McLean, Ian S.; Wizinowich, Peter

    2012-09-01

    In this paper we describe both recently completed instrumentation projects and our current development efforts in terms of their role in the strategic plan, the key science areas they address, and their performance as measured or predicted. Projects reaching completion in 2012 include MOSFIRE, a near IR multi-object spectrograph, a laser guide star adaptive optics facility on the Keck I telescope, and an upgrade to the guide camera for the HIRES instrument on Keck I. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager (KCWI), an upgrade to the telescope control systems on both Keck telescopes, a near-IR tip/tilt sensor for the Keck I adaptive optics system, and a new grating for the OSIRIS integral field spectrograph.

  7. Intelligent Virtual Assistant's Impact on Technical Proficiency within Virtual Teams

    ERIC Educational Resources Information Center

    Graham, Christian; Jones, Nory B.

    2016-01-01

    Information-systems development continues to be a difficult process, particularly for virtual teams that do not have the luxury of meeting face-to-face. The research literature on this topic reinforces this point: the greater part of database systems development projects ends in failure. The use of virtual teams to complete projects further…

  8. Project development laboratories energy fuels and oils based on NRU “MPEI”

    NASA Astrophysics Data System (ADS)

    Burakov, I. A.; Burakov, A. Y.; Nikitina, I. S.; Khomenkov, A. M.; Paramonova, A. O.; Khtoo Naing, Aung

    2017-11-01

    In the process of improving the efficiency of power plants a hot topic is the use of high-quality fuels and lubricants. In the process of transportation, preparation for use, storage and maintenance of the properties of fuels and lubricants may deteriorate, which entails a reduction in the efficiency of power plants. One of the ways to prevent the deterioration of the properties is a timely analysis of the relevant laboratories. In this day, the existence of laboratories of energy fuels and energy laboratory oil at thermal power stations is satisfactory character. However, the training of qualified personnel to work in these laboratories is a serious problem, as the lack of opportunities in these laboratories a complete list of required tests. The solution to this problem is to explore the possibility of application of methods of analysis of the properties of fuels and lubricants in the stage of training and re-training of qualified personnel. In this regard, on the basis of MPEI developed laboratory projects of solid, liquid and gaseous fuels, power and energy oils and lubricants. Projects allow for a complete list of tests required for the timely control of properties and prevent the deterioration of these properties. Assess the financial component of the implementation of the developed projects based on the use of modern equipment used for tests. Projects allow for a complete list of tests required for the timely control of properties and prevent the deterioration of these properties.

  9. John Day River Subbasin Fish Habitat Enhancement Project, 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Powell, Russ M.; Jerome, James P.; Delano, Kenneth H.

    2003-03-01

    Work undertaken in 2002 included: (1) Seven new fence projects were completed thereby protecting 6.0 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) New fence construction (300ft) plus one watergap on Indian Creek/ Kuhl property. (4) Maintenance of all active project fences (58.76 miles), watergaps (56), spring developments (32) and plantings were checked and repairs performed. (5) Restoration and Enhancement projects protected 3 miles of stream within the basin. (6) Since the initiation of the Fish Habitat Project in 1984 we have 67.21 miles of stream protected using 124.2 miles of fence.more » With the addition of the Restoration and Enhancement Projects we have 199.06 miles of fence protecting 124.57 miles of stream.« less

  10. Teaching introductory game development with unreal engine: Challenges, strategies, and experiences

    NASA Astrophysics Data System (ADS)

    Head, Nicholas A.

    From the days of Pong to 100 million dollar projects such as the Grand Theft Auto franchise, video games have evolved significantly over the years. This evolution has also changed the way game development is viewed as a career. Today, video games are one of the most profitable forms of entertainment, and game development courses are appearing at universities around the world. Even with this growth, a degree from a university has yet to be an important factor in finding a job in game development (Owen, 2013). This thesis examines a method of creating and implementing an introductory gaming course and recommends ways to improve the curriculum. The main focus of the course was to introduce game development to the students. Each week, they were given an exercise that covered a different topic. Students also took part in a team project in which they were tasked with creating a complete game. The goal of the team projects was to expand the student's basic knowledge given to them from the exercises. Data was gathered on the students' subjective experiences with the class. This data and the class's overall performance were compared with past iterations of the course. New to the course was the Unreal Engine. Students used the latest version of the engine, Unreal Engine 4, to complete exercises. Not all students chose to use this engine for the team project. Instructor and students experiences with the engine were also recorded. While there were some problems implementing the engine within our lab environment, we were still able to execute the overall lesson plan. Even with the engine issues, the course had overall good performance. CGT 241, Introduction to 3D Animation, was shown to help the students to complete the course while CGT 215, Computer Graphics Programming I, did not provide enough information on game programming. Exercises were found to be helpful but students wanted a better understanding of how these skills can be applied to game development. Team projects also went well with most teams creating a functional project. Students wanted more time to complete projects along with a structured approach to the project. Confidence in game development and the Unreal Engine were not high but students were enthusiastic in continuing in the field of game development. Recommendations were made to the curriculum in order to fix some of the issues with the introductory course and help students find a career. In order to fix the gap between the programming course and the introductory game course, a video game programming course was recommended that focused on teaching students how code works with video game engines. An option to specialize was also recommended in order to see a higher level of understanding on game concepts and a higher level of quality of game projects. Changes to the higher courses were also made for a yearlong course where students would focus on a single project to publish. This would expand on the introductory course while also replicating the game development process.

  11. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  12. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, R.C.

    The National Conference of State Legislatures' Geothermal Policy Project concentrated its efforts in two areas: (1) state activities and (2) development of project materials. Six states were to participate in the project during its first year: Delaware, Hawaii, New Mexico, Oregon, Utah and Virginia. The project pamphlet, a final draft of the Issue Paper and the review of state statutes and regulations were completed. Project activities are also discussed in the following areas: publicity, liaison activities, professional papers, and conferences.

  14. Controlled ecological life support system breadboard project, 1988

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  15. Informal worker phenomenon in housing construction project

    NASA Astrophysics Data System (ADS)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  16. A New Analytic-Adaptive Model for EGS Assessment, Development and Management Support

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Danko, George L

    To increase understanding of the energy extraction capacity of Enhanced Geothermal System(s) (EGS), a numerical model development and application project is completed. The general objective of the project is to develop and apply a new, data-coupled Thermal-Hydrological-Mechanical-Chemical (T-H-M-C) model in which the four internal components can be freely selected from existing simulation software without merging and cross-combining a diverse set of computational codes. Eight tasks are completed during the project period. The results are reported in five publications, an MS thesis, twelve quarterly, and two annual reports to DOE. Two US patents have also been issued during the project period,more » with one patent application originated prior to the start of the project. The “Multiphase Physical Transport Modeling Method and Modeling System” (U.S. Patent 8,396,693 B2, 2013), a key element in the GHE sub-model solution, is successfully used for EGS studies. The “Geothermal Energy Extraction System and Method" invention (U.S. Patent 8,430,166 B2, 2013) originates from the time of project performance, describing a new fluid flow control solution. The new, coupled T-H-M-C numerical model will help analyzing and designing new, efficient EGS systems.« less

  17. Launching online education for 911 telecommunicators and EMS personnel: experiences from the North Carolina Rapid Response to Stroke Project.

    PubMed

    Lellis, Julie C; Brice, Jane H; Evenson, Kelly R; Rosamond, Wayne D; Kingdon, David; Morris, Dexter L

    2007-01-01

    We describe the development and implementation of the North Carolina Rapid Response to Stroke (NCRRS) project--a community-based online education project developed for 911 telecommunicators and EMS personnel. Two online courses, one for 911 telecommunicators and one for EMS personnel, were designed to provide timely and accessible continuing education on stroke assessment and care. Eight county-based emergency management systems, representing 15 agencies, were recruited for participation in a 4-month trial of the online courses in 2003. A total of 150 telecommunicators and 208 EMS personnel completed the courses. Results showed high levels of participant satisfaction with the program and improvements in posttest scores; agency leaders also provided positive feedback on the project. Motivators to complete the education identified by participants included peers, agency support, and materials provided by the NCRRS project. Courses were revised on the basis of feedback and successfully sustained online through August 2006, providing free stroke education for almost 1,000 additional 911 telecommunicators and EMS personnel in North Carolina. We describe the process of development and implementation that ensured project success. The results of this study show the need for and value of online stroke education for emergency services personnel and describe the challenges of developing and implementing online continuing education for this population. Similar education programs should be developed. Programs should incorporate comprehensive recruitment programs and community-based networks that sustain interest and promote full participation in educational offerings.

  18. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  19. American River College Beacon Project: Student Catalyst Program - Peer Assisted Learning. First Semester Summary Report.

    ERIC Educational Resources Information Center

    American River Coll., Sacramento, CA.

    The Peer Assisted Learning (PAL) Project at American River College (ARC) in Sacramento, California, was developed to improve retention rates among underrepresented students in math and science classes with high dropout rates. The project involved a group of 24 paid student Learning Assistants (LA's) who successfully completed the targeted courses…

  20. MUJER: Mothers United for Jobs, Education, and Results. 1997-8 Project FORWARD Project-based Learning Project Summary.

    ERIC Educational Resources Information Center

    Green, Anson M.

    Students in the Culebra Road GED/JOBS (General Educational Development/Job Opportunities and Basic Skills) class, an adult education class for Temporary Assistance for Needy Families (TANF) students, created their own website. First, students completed a computer literacy survey to gauge their computer skills. Next, students were encouraged to…

  1. "Hey, I Can Do This!" The Benefits of Conducting Undergraduate Psychology Research for Young Adult Development

    ERIC Educational Resources Information Center

    Searight, H. Russell; Ratwik, Susan; Smith, Todd

    2010-01-01

    Many undergraduate programs require students to complete an independent research project in their major field prior to graduation. These projects are typically described as opportunities for integration of coursework and a direct application of the methods of inquiry specific to a particular discipline. Evaluations of curricular projects have…

  2. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understandingmore » of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.« less

  3. An assessment of collections at the University of Wisconsin-Madison Health Sciences Libraries: drug resistance.

    PubMed Central

    Bergen, P L; Nemec, D

    1999-01-01

    In December 1997, the authors completed an in-depth collection assessment project at the University of Wisconsin-Madison Health Sciences Libraries. The purpose was to develop a framework for future collection assessment projects by completing a multifaceted evaluation of the libraries' monograph and serial collections in the subject area of drug resistance. Evaluators adapted and synthesized several traditional collection assessment tools, including shelflist measurement, bibliography and standard list checking, and citation analysis. Throughout the project, evaluators explored strategies to overcome some of the problems inherent in the application of traditional collection assessment methods to the evaluation of biomedical collections. Their efforts resulted in the identification of standard monographs and core journals for the subject area, a measurement of the collections' strength relative to the collections of benchmark libraries, and a foundation for future collection development within the subject area. The project's primary outcome was a collection assessment methodology that has potential application to both internal and cooperative collection development in medical, pharmaceutical, and other health sciences libraries. PMID:9934527

  4. ToHajiilee Economic Development, Inc.(TEDI) Feasibility Study for Utility-Scale Solar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burpo, Rob

    2012-02-29

    To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viabilitymore » of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.« less

  5. Magnetic sensor for nondestructive evaluation of deteriorated prestressing strand : phase II.

    DOT National Transportation Integrated Search

    2011-08-01

    This report gives an account of the execution and achievements in Phase II of the project completed through August 2011. The main objective of this project is to advance the practical development of a nondestructive testing and evaluation method usin...

  6. Foundation observation of teaching project--a developmental model of peer observation of teaching.

    PubMed

    Pattison, Andrew Timothy; Sherwood, Morgan; Lumsden, Colin James; Gale, Alison; Markides, Maria

    2012-01-01

    Peer observation of teaching is important in the development of educators. The foundation curriculum specifies teaching competencies that must be attained. We created a developmental model of peer observation of teaching to help our foundation doctors achieve these competencies and develop as educators. A process for peer observation was created based on key features of faculty development. The project consisted of a pre-observation meeting, the observation, a post-observation debrief, writing of reflective reports and group feedback sessions. The project was evaluated by completion of questionnaires and focus groups held with both foundation doctors and the students they taught to achieve triangulation. Twenty-one foundation doctors took part. All completed reflective reports on their teaching. Participants described the process as useful in their development as educators, citing specific examples of changes to their teaching practice. Medical students rated the sessions as better or much better quality as their usual teaching. The study highlights the benefits of the project to individual foundation doctors, undergraduate medical students and faculty. It acknowledges potential anxieties involved in having teaching observed. A structured programme of observation of teaching can deliver specific teaching competencies required by foundation doctors and provides additional benefits.

  7. Hybrid plasma modeling.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hopkins, Matthew Morgan; DeChant, Lawrence Justin.; Piekos, Edward Stanley

    2009-02-01

    This report summarizes the work completed during FY2007 and FY2008 for the LDRD project ''Hybrid Plasma Modeling''. The goal of this project was to develop hybrid methods to model plasmas across the non-continuum-to-continuum collisionality spectrum. The primary methodology to span these regimes was to couple a kinetic method (e.g., Particle-In-Cell) in the non-continuum regions to a continuum PDE-based method (e.g., finite differences) in continuum regions. The interface between the two would be adjusted dynamically ased on statistical sampling of the kinetic results. Although originally a three-year project, it became clear during the second year (FY2008) that there were not sufficientmore » resources to complete the project and it was terminated mid-year.« less

  8. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, aremore » at the end of each subprogram section.« less

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eshraghi, Ray

    In September 2008, the U.S. Department of Energy and Martin County Economic Development Corporation entered into an agreement to further the advancement of a microtubular PEM fuel cell developed by Microcell Corporation. The overall focus of this project was on research and development related to high volume manufacturing of fuel cells and cost reduction in the fuel cell manufacturing process. The extrusion process used for the microfiber fuel cells in this project is inherently a low cost, high volume, high speed manufacturing process. In order to take advantage of the capabilities that the extrusion process provides, all subsequent manufacturing processesmore » must be enhanced to meet the extrusion line’s speed and output. Significant research and development was completed on these subsequent processes to ensure that power output and performance were not negatively impacted by the higher speeds, design changes and process improvements developed in this project. All tasks were successfully completed resulting in cost reductions, performance improvements and process enhancements in the areas of speed and quality. These results support the Department of Energy’s goal of fuel cell commercialization.« less

  10. National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W J; Moses, E; Warner, B

    2000-12-07

    The National Ignition Facility (NIF) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beampath infrastructure has been reconsidered and a new approach has been developed. This papermore » will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  11. The National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W.J.; Moses, E.; Warner, B.

    2000-12-07

    The National Ignition Facility (NIT) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beam path infrastructure has been reconsidered and a new approach has been developed. Thismore » paper will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  12. Building Faculty Community: Fellowship in Graduate Medical Education Administration

    PubMed Central

    Edler, Alice A.; Dohn, Ann; Davidson, Heather A.; Grewal, Daisy; Behravesh, Bardia; Piro, Nancy

    2009-01-01

    Introduction The Department of Graduate Medical Education at Stanford Hospital and Clinics has developed a professional training program for program directors. This paper outlines the goals, structure, and expected outcomes for the one-year Fellowship in Graduate Medical Education Administration program. Background The skills necessary for leading a successful Accreditation Council for Graduate Medical Education (ACGME) training program require an increased level of curricular and administrative expertise. To meet the ACGME Outcome Project goals, program directors must demonstrate not only sophisticated understanding of curricular design but also competency-based performance assessment, resource management, and employment law. Few faculty-development efforts adequately address the complexities of educational administration. As part of an institutional-needs assessment, 41% of Stanford program directors indicated that they wanted more training from the Department of Graduate Medical Education. Intervention To address this need, the Fellowship in Graduate Medical Education Administration program will provide a curriculum that includes (1) readings and discussions in 9 topic areas, (2) regular mentoring by the director of Graduate Medical Education (GME), (3) completion of a service project that helps improve GME across the institution, and (4) completion of an individual scholarly project that focuses on education. Results The first fellow was accepted during the 2008–2009 academic year. Outcomes for the project include presentation of a project at a national meeting, internal workshops geared towards disseminating learning to peer program directors, and the completion of a GME service project. The paper also discusses lessons learned for improving the program. PMID:21975722

  13. John Day River Subbasin Fish Habitat Enhancement Project, 2005-2006 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Powell, Russ M.; Alley, Pamela D.; Delano, Kenneth H.

    2006-03-01

    Work undertaken in 2005 included: (1) Four new fence projects were completed thereby protecting 7.55 miles of stream with 9.1 miles of new riparian fence (2) Fence removal 1.7 miles of barbed wire. (3) Completed three spring developments (repair work on two BLM springs on Cottonwood Creek (Dayville), 1 solar on Rock Creek/ Collins property). (4) Dredge tail leveling completed on 0.9 miles of the Middle Fork of the John Day River (5) Cut, hauled and placed 30 junipers on Indian Creek/Kuhl property for bank stability. (6) Collected and planted 1500 willow cuttings on Mountain Creek/Jones property. (7) Conducted steelheadmore » redd counts on Lake Cr./Hoover property and Cottonwood Cr./Mascall properties (8) Seeded 200 lbs of native grass seed on projects where the sites were disturbed by fence construction activities. (9) Maintenance of all active project fences (72.74 miles), watergaps (60), spring developments (30) were checked and repairs performed. (10) Since the initiation of the Fish Habitat Program in 1984 we have installed 156.06 miles of riparian fence on leased property protecting 88.34 miles of anadromous fish bearing stream. With the addition of the Restoration and Enhancement Projects from 1996-2001, where the landowner received the materials, built and maintained the project we have a total of 230.92 miles of fence protecting 144.7 miles of stream and 3285 acres of riparian habitat.« less

  14. ExMC Technology Watch

    NASA Technical Reports Server (NTRS)

    Krihak, M.; Watkins, S.; Shaw, T.

    2014-01-01

    The Technology Watch (Tech Watch) project is directed by the NASA Human Research Program's (HRP) Exploration Medical Capability (ExMC) element, and primarily focuses on ExMC technology gaps. The project coordinates the efforts of multiple NASA centers, including the Johnson Space Center (JSC), Glenn Research Center (GRC), Ames Research Center (ARC), and the Langley Research Center (LaRC). The objective of Tech Watch is to identify emerging, high-impact technologies that augment current NASA HRP technology development efforts. Identifying such technologies accelerates the development of medical care and research capabilities for the mitigation of potential health issues encountered during human space exploration missions. The aim of this process is to leverage technologies developed by academia, industry and other government agencies and to identify the effective utilization of NASA resources to maximize the HRP return on investment. The establishment of collaborations with these entities is beneficial to technology development, assessment and/or insertion, and advance NASA's goal to provide a safe and healthy environment for human exploration. In fiscal year 2013, the Tech Watch project maintained student project activity aimed at specific ExMC gaps, completed the gap report review cycle for all gaps through a maturated gap report review process, and revised the ExMC Tech Watch Sharepoint site for enhanced data content and organization. Through site visits, internships and promotions via aerospace journals, several student projects were initiated and completed this past year. Upon project completion, the students presented their results via telecom or WebEx to the ExMC Element as a whole. The upcoming year will continue to forge strategic alliances and student projects in the interest of technology and knowledge gap closure. Through the population of Sharepoint with technologies assessed by the gap owners, the database expansion will develop a more comprehensive technology set for each gap. By placing such data in Sharepoint, the gap report updates in fiscal year 2014 are anticipated to be streamlined since the evaluated technologies will be readily available to the gap owners in a sortable archive, and may be simply exported into the final gap report presentation

  15. ExMC Technology Watch

    NASA Technical Reports Server (NTRS)

    Krihak, M.; Watkins, S.; Shaw, T.

    2014-01-01

    The Technology Watch (Tech Watch) project is directed by the NASA Human Research Programs (HRP) Exploration Medical Capability (ExMC) element, and primarily focuses on ExMC technology gaps. The project coordinates the efforts of multiple NASA centers, including the Johnson Space Center (JSC), Glenn Research Center (GRC), Ames Research Center (ARC), and the Langley Research Center (LaRC). The objective of Tech Watch is to identify emerging, high-impact technologies that augment current NASA HRP technology development efforts. Identifying such technologies accelerates the development of medical care and research capabilities for the mitigation of potential health issues encountered during human space exploration missions. The aim of this process is to leverage technologies developed by academia, industry and other government agencies and to identify the effective utilization of NASA resources to maximize the HRP return on investment. The establishment of collaborations with these entities is beneficial to technology development, assessment and/or insertion, and advance NASAs goal to provide a safe and healthy environment for human exploration. In fiscal year 2013, the Tech Watch project maintained student project activity aimed at specific ExMC gaps, completed the gap report review cycle for all gaps through a maturated gap report review process, and revised the ExMC Tech Watch Sharepoint site for enhanced data content and organization. Through site visits, internships and promotions via aerospace journals, several student projects were initiated and completed this past year. Upon project completion, the students presented their results via telecom or WebEx to the ExMC Element as a whole. The upcoming year will continue to forge strategic alliances and student projects in the interest of technology and knowledge gap closure. Through the population of Sharepoint with technologies assessed by the gap owners, the database expansion will develop a more comprehensive technology set for each gap. By placing such data in Sharepoint, the gap report updates in fiscal year 2014 are anticipated to be streamlined since the evaluated technologies will be readily available to the gap owners in a sortable archive, and may be simply exported into the final gap report presentation.

  16. Development of Novel Local Analgesics for Management of Acute Tissue Injury Pain

    DTIC Science & Technology

    2017-09-01

    assess biodistribution, tolerance and toxicity of candidate NCEs. 15% complete The goal of our project is to develop a new approach to the management ... Project Manager Boston Biomedical Innovation Center 215 First Street, Suite 500; Cambridge, MA 02142 857-307-2441 | rblackman1@partners.org | b...AWARD NUMBER: W81XWH-15-1-0480 TITLE: Development of Novel Local Analgesics for Management of Acute Tissue Injury Pain PRINCIPAL

  17. Enhancing frontline clinical leadership in an acute hospital trust.

    PubMed

    Phillips, Natasha; Byrne, Geraldine

    2013-09-01

    To report on a leadership programme for ward managers in one National Health Service Trust that aimed to enhance their contribution to the delivery of the organisation's key objectives to support excellent patient experience. Effective ward leadership has been recognised as vital to the quality of care, resource management and interprofessional working. However, there is evidence that, at present, front-line nurse leaders are ill equipped to lead effectively and lack confidence in their ability to do so. The project aimed to provide a tailored programme for ward managers to develop their portfolio of skills to perform this pivotal role. The course contained two key elements: an integrated teaching programme to enhance leadership knowledge and skills and action learning to facilitate application to individual's own leadership practice. Both were underpinned by a change project where each individual identified, undertook and evaluated an innovation in practice. Twenty-two ward managers completed the leadership programme. Participants completed semi-structured questionnaires after each taught module. Action learning was evaluated through a combined structured and semi-structured questionnaire. All participants evaluated the programme as increasing their repertoire of leadership skills. Following completion of the programme, ward managers continue to work together as an evolving community of practice. Ward managers' development is enhanced by a programme integrating theory, action learning and completion of a ward-based project. Ward managers cannot be effectively developed in isolation. Leadership development is best supported where the organisation is also committed to developing. A leadership development programme that incorporates knowledge from within the organisation with external expertise can be an effective method to enhance front-line clinical leadership. © 2013 Blackwell Publishing Ltd.

  18. Biomass District Heat System for Interior Rural Alaska Villages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wall, William A.; Parker, Charles R.

    2014-09-01

    Alaska Village Initiatives (AVI) from the outset of the project had a goal of developing an integrated village approach to biomass in Rural Alaskan villages. A successful biomass project had to be ecologically, socially/culturally and economically viable and sustainable. Although many agencies were supportive of biomass programs in villages none had the capacity to deal effectively with developing all of the tools necessary to build a complete integrated program. AVI had a sharp learning curve as well. By the end of the project with all the completed tasks, AVI developed the tools and understanding to connect all of the dotsmore » of an integrated village based program. These included initially developing a feasibility model that created the capacity to optimize a biomass system in a village. AVI intent was to develop all aspects or components of a fully integrated biomass program for a village. This meant understand the forest resource and developing a sustainable harvest system that included the “right sized” harvest equipment for the scale of the project. Developing a training program for harvesting and managing the forest for regeneration. Making sure the type, quality, and delivery system matched the needs of the type of boiler or boilers to be installed. AVI intended for each biomass program to be of the scale that would create jobs and a sustainable business.« less

  19. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to complete all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the second quarter (1/1/2013 to 3/31/2013), all the technical and legal documents for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. The revised CRADA documents were sent to DOE, Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for completing legal documents for the project. A non-disclosure agreement was revised and sent to all the parties for reviews.« less

  20. Test and Evaluation Management Guide

    DTIC Science & Technology

    1988-03-01

    of the acquisition community at large, whose comments, suggestions, and materials were helpful in completing this project . The ...analysis are particularly useful in the early stages of development to provide early projections before system hardware is available. These methods are also...Statement is prescribed by DoD Instruction 5000.2. In summary, it contains the following: o A description of the mission need 0 The projected

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Danko, George L

    To increase understanding of the energy extraction capacity of Enhanced Geothermal System(s) (EGS), a numerical model development and application project is completed. The general objective of the project is to develop and apply a new, data-coupled Thermal-Hydrological-Mechanical-Chemical (T-H-M-C) model in which the four internal components can be freely selected from existing simulation software without merging and cross-combining a diverse set of computational codes. Eight tasks are completed during the project period. The results are reported in five publications, an MS thesis, twelve quarterly, and two annual reports to DOE. Two US patents have also been issued during the project period,more » with one patent application originated prior to the start of the project. The “Multiphase Physical Transport Modeling Method and Modeling System” (U.S. Patent 8,396,693 B2, 2013), a key element in the GHE sub-model solution, is successfully used for EGS studies. The “Geothermal Energy Extraction System and Method" invention (U.S. Patent 8,430,166 B2, 2013) originates from the time of project performance, describing a new fluid flow control solution. The new, coupled T-H-M-C numerical model will help analyzing and designing new, efficient EGS systems.« less

  2. Nbody Simulations and Weak Gravitational Lensing using new HPC-Grid resources: the PI2S2 project

    NASA Astrophysics Data System (ADS)

    Becciani, U.; Antonuccio-Delogu, V.; Costa, A.; Comparato, M.

    2008-08-01

    We present the main project of the new grid infrastructure and the researches, that have been already started in Sicily and will be completed by next year. The PI2S2 project of the COMETA consortium is funded by the Italian Ministry of University and Research and will be completed in 2009. Funds are from the European Union Structural Funds for Objective 1 regions. The project, together with a similar project called Trinacria GRID Virtual Laboratory (Trigrid VL), aims to create in Sicily a computational grid for e-science and e-commerce applications with the main goal of increasing the technological innovation of local enterprises and their competition on the global market. PI2S2 project aims to build and develop an e-Infrastructure in Sicily, based on the grid paradigm, mainly for research activity using the grid environment and High Performance Computer systems. As an example we present the first results of a new grid version of FLY a tree Nbody code developed by INAF Astrophysical Observatory of Catania, already published in the CPC program Library, that will be used in the Weak Gravitational Lensing field.

  3. Precision bone and muscle loss measurements by advanced, multiple projection DEXA (AMPDXA) techniques for spaceflight applications

    NASA Technical Reports Server (NTRS)

    Charles, H. K. Jr; Beck, T. J.; Feldmesser, H. S.; Magee, T. C.; Spisz, T. S.; Pisacane, V. L.

    2001-01-01

    An advanced, multiple projection, dual energy x-ray absorptiometry (AMPDXA) scanner system is under development. The AMPDXA is designed to make precision bone and muscle loss measurements necessary to determine the deleterious effects of microgravity on astronauts as well as develop countermeasures to stem their bone and muscle loss. To date, a full size test system has been developed to verify principles and the results of computer simulations. Results indicate that accurate predictions of bone mechanical properties can be determined from as few as three projections, while more projections are needed for a complete, three-dimensional reconstruction. c 2001. Elsevier Science Ltd. All rights reserved.

  4. Ceramic technology for advanced heat engines project: Semiannual progress report for April through September 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-03-01

    An assessment of needs was completed, and a five-year project plan was developed with extensive input from private industry. Objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barriermore » and wear applications in these engines.« less

  5. Note: The Numbering of Postgraduate Research.

    ERIC Educational Resources Information Center

    Wafford, Geoffrey

    1984-01-01

    Implications of the trend toward funding only graduate research projects that have a high likelihood of completion are discussed, including allocation of funds according to institutions' completion rates, deemphasis on research quality and students' personal development, and overemphasis on producing graduates. A more balanced approach to research…

  6. Evaluating Evidence-Based Practice Knowledge and Beliefs Through the e-Learning EBP Academy.

    PubMed

    Green, Angela; Jeffs, Debra A; Boateng, Beatrice A; Lowe, Gary R; Walden, Marlene

    2017-07-01

    This research examined evidence-based practice (EBP) knowledge and beliefs before and after a 3-month e-learning program was implemented to build EBP capacity at a large children's hospital. Ten clinicians completed the development, implementation, and evaluation of the e-learning education, comprising phase one. Revision and participation by 41 clinicians followed in phase two. Participants in both phases completed the EBP Beliefs and Implementation Scales preintervention, postintervention, and 6 months after postintervention. EBP beliefs and implementation increased immediately and 6 months after postintervention, with statistically significant increases in both phases. Participants in both phases applied knowledge by completing mentor-supported EBP projects. Although EBP beliefs and implementation scores increased and e-learning provided flexibility for clinician participation, challenges arose, resulting in lower-than-expected completion. Subsequent revisions resulted in hybrid education, integrating classroom and e-learning with project mentoring. This funded e-learning research contributes knowledge to the growing specialty of professional development. J Contin Educ Nurs. 2017;48(7):304-311. Copyright 2017, SLACK Incorporated.

  7. Arctic Energy Technology Development Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sukumar Bandopadhyay; Charles Chamberlin; Robert Chaney

    2008-12-31

    The Arctic Energy Technology Development Laboratory was created by the University of Alaska Fairbanks in response to a congressionally mandated funding opportunity through the U.S. Department of Energy (DOE), specifically to encourage research partnerships between the university, the Alaskan energy industry, and the DOE. The enabling legislation permitted research in a broad variety of topics particularly of interest to Alaska, including providing more efficient and economical electrical power generation in rural villages, as well as research in coal, oil, and gas. The contract was managed as a cooperative research agreement, with active project monitoring and management from the DOE. Inmore » the eight years of this partnership, approximately 30 projects were funded and completed. These projects, which were selected using an industry panel of Alaskan energy industry engineers and managers, cover a wide range of topics, such as diesel engine efficiency, fuel cells, coal combustion, methane gas hydrates, heavy oil recovery, and water issues associated with ice road construction in the oil fields of the North Slope. Each project was managed as a separate DOE contract, and the final technical report for each completed project is included with this final report. The intent of this process was to address the energy research needs of Alaska and to develop research capability at the university. As such, the intent from the beginning of this process was to encourage development of partnerships and skills that would permit a transition to direct competitive funding opportunities managed from funding sources. This project has succeeded at both the individual project level and at the institutional development level, as many of the researchers at the university are currently submitting proposals to funding agencies, with some success.« less

  8. Student Engagement and Completion in Precalculus Precalculus Mega Section: Efficiently Assisting Student Engagement and Completion with Communications and Information Technology

    ERIC Educational Resources Information Center

    Brusi, Rima; Portnoy, Arturo; Toro, Nilsa

    2013-01-01

    The Precalculus Mega Section project was developed with the main purpose of improving the overall performance of the student body in Precalculus, an important gatekeeper course that affects student engagement and completion, with typical drop/failure rates of over 50 percent. Strategies such as integration of technology and additional practice…

  9. 75 FR 8393 - Central Utah Project Completion Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... to reduce loss of water during the late irrigation season period of water shortage, and perforated... be taken in order to more efficiently utilize existing ground-water supplies in conjunction with existing surface water supplies. The Bonneville Unit of the Central Utah Project was authorized to develop...

  10. A Future Fair: Building Tomorrow Today.

    ERIC Educational Resources Information Center

    Weatherly, Myra S.

    1992-01-01

    Gifted intermediate-level students in Greenville, South Carolina, held a Future Fair in which students completed projects and developed critical and creative thinking skills as they investigated real problems. Projects such as models, inventions, photo essays, and creative writing focused on future schools, art, fashions, space travel, and other…

  11. Evaluation of a proposed expert system development methodology: Two case studies

    NASA Technical Reports Server (NTRS)

    Gilstrap, Lewey

    1990-01-01

    Two expert system development projects were studied to evaluate a proposed Expert Systems Development Methodology (ESDM). The ESDM was developed to provide guidance to managers and technical personnel and serve as a standard in the development of expert systems. It was agreed that the proposed ESDM must be evaluated before it could be adopted; therefore a study was planned for its evaluation. This detailed study is now underway. Before the study began, however, two ongoing projects were selected for a retrospective evaluation. They were the Ranging Equipment Diagnostic Expert System (REDEX) and the Backup Control Mode Analysis and Utility System (BCAUS). Both projects were approximately 1 year into development. Interviews of project personnel were conducted, and the resulting data was used to prepare the retrospective evaluation. Decision models of the two projects were constructed and used to evaluate the completeness and accuracy of key provisions of ESDM. A major conclusion reached from these case studies is that suitability and risk analysis should be required for all AI projects, large and small. Further, the objectives of each stage of development during a project should be selected to reduce the next largest area of risk or uncertainty on the project.

  12. Onshore and Offshore Outsourcing with Agility: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Kussmaul, Clifton

    This chapter reflects on case study based an agile distributed project that ran for approximately three years (from spring 2003 to spring 2006). The project involved (a) a customer organization with key personnel distributed across the US, developing an application with rapidly changing requirements; (b) onshore consultants with expertise in project management, development processes, offshoring, and relevant technologies; and (c) an external offsite development team in a CMM-5 organization in southern India. This chapter is based on surveys and discussions with multiple participants. The several years since the project was completed allow greater perspective on both the strengths and weaknesses, since the participants can reflect on the entire life of the project, and compare it to subsequent experiences. Our findings emphasize the potential for agile project management in distributed software development, and the importance of people and interactions, taking many small steps to find and correct errors, and matching the structures of the project and product to support implementation of agility.

  13. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lear, Jon; Bennett, Carlon; Lear, Dan

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator -more » Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.« less

  14. The California Cooperative Remote Sensing Project

    NASA Technical Reports Server (NTRS)

    Hlavka, Christine A.; Sheffner, Edwin J.

    1988-01-01

    The USDA, the California Department of Water Resources (CDWR), the Remote Sensing Research Program of the University of California (UCB) and NASA have completed a 4-yr cooperative project on the use of remote sensing in monitoring California agriculture. This report is a summary of the project and the final report of NASA's contribution to it. The cooperators developed procedures that combined the use of LANDSAT Multispectral Scanner imagery and digital data with good ground survey data for area estimation and mapping of the major crops in California. An inventory of the Central Valley was conducted as an operational test of the procedures. The satellite and survey data were acquired by USDA and UCB and processed by CDWR and NASA. The inventory was completed on schedule, thus demonstrating the plausibility of the approach, although further development of the data processing system is necessary before it can be used efficiently in an operational environment.

  15. A Practical Project To Help Bilingual Students To Develop Their Knowledge of Science and English Language.

    ERIC Educational Resources Information Center

    Fouzder, Nani B.; Markwick, Andrew J. W.

    1999-01-01

    Describes a class project that included a literature search, observation of the Hale-Bopp comet, planning and building a model solar system, and presentation of the model in class. Finds that bilingual students in the class made significant progress in their learning of concepts and the acquisition of English as a result of completing the project.…

  16. Report of the Computer Assisted Instruction Project in the Faculty of Nursing at the University of Calgary.

    ERIC Educational Resources Information Center

    Hannah, Kathryn

    Since August of 1976, the Faculty of Nursing at the University of Calgary has developed and implemented a four-phase computer assisted instruction (CAI) project. In Phase I, the pilot project to demonstrate effectiveness of CAI as an alternative teaching strategy in that setting has been completed and replication is on-going. In Phase II,…

  17. MIRAGE: developments in IRSP systems, RIIC design, emitter fabrication, and performance

    NASA Astrophysics Data System (ADS)

    Bryant, Paul; Oleson, Jim; James, Jay; McHugh, Steve; Lannon, John; Vellenga, David; Goodwin, Scott; Huffman, Alan; Solomon, Steve; Goldsmith, George C., II

    2005-05-01

    SBIR's family of MIRAGE infrared scene projection systems is undergoing significant growth and expansion. The first two lots of production IR emitters have completed fabrication at Microelectronics Center of North Carolina/Research and Development Institute (MCNC-RDI), and the next round(s) of emitter production has begun. These latest emitter arrays support programs such as Large Format Resistive Array (LFRA), Optimized Array for Space-based Infrared Simulation (OASIS), MIRAGE 1.5, and MIRAGE II. We present the latest performance data on emitters fabricated at MCNC-RDI, plus integrated system performance on recently completed IRSP systems. Teamed with FLIR Systems/Indigo Operations, SBIR and the Tri-Services IRSP Working Group have completed development of the CMOS Read-In Integrated Circuit (RIIC) portion of the Wide Format Resistive Array (WFRA) program-to extend LFRA performance to a 768 x 1536 "wide screen" projection configuration. WFRA RIIC architecture and performance is presented. Finally, we summarize development of the LFRA Digital Emitter Engine (DEE) and OASIS cryogenic package assemblies, the next-generation Command & Control Electronics (C&CE).

  18. INNOVATIVE FOSSIL FUEL FIRED VITRIFICATION TECHNOLOGY FOR SOIL REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Hnat; L.M. Bartone; M. Pineda

    2001-07-13

    This Summary Report summarizes the progress of Phases 3, 3A and 4 of a waste technology Demonstration Project sponsored under a DOE Environmental Management Research and Development Program and administered by the U.S. Department of Energy National Energy Technology Laboratory-Morgantown (DOE-NETL) for an ''Innovative Fossil Fuel Fired Vitrification Technology for Soil Remediation''. The Summary Reports for Phases 1 and 2 of the Program were previously submitted to DOE. The total scope of Phase 3 was to have included the design, construction and demonstration of Vortec's integrated waste pretreatment and vitrification process for the treatment of low level waste (LLW), TSCA/LLWmore » and mixed low-level waste (MLLW). Due to funding limitations and delays in the project resulting from a law suit filed by an environmental activist and the extended time for DOE to complete an Environmental Assessment for the project, the scope of the project was reduced to completing the design, construction and testing of the front end of the process which consists of the Material Handling and Waste Conditioning (MH/C) Subsystem of the vitrification plant. Activities completed under Phases 3A and 4 addressed completion of the engineering, design and documentation of the Material Handling and Conditioning System such that final procurement of the remaining process assemblies can be completed and construction of a Limited Demonstration Project be initiated in the event DOE elects to proceed with the construction and demonstration testing of the MH/C Subsystem.« less

  19. McKenzie River Focus Watershed Coordination: Year-End Report 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thrailkil, Jim

    2000-01-01

    This report summarizes accomplishments of the McKenzie River Focus Watershed Council (MWC) in the areas of coordination and administration during Fiscal Year 2000. Coordination and administration consist of prioritization and planning for projects; project management and implementation; procurement of funding for long-term support of the Council; and watershed education/outreach program for residents and local schools. Key accomplishments in the area of project planning include coordinating: monthly Council and executive committee meetings; staffing the Upper Willamette Spring Chinook Working Group; staffing the water quality technical committee; and guiding education and stewardship projects. Key accomplishments in the area of project management includemore » the completion of the McKenzie-Willamette Confluence Assessment; securing funds for project planning in the confluence area; near completion of the BPA funded McKenzie sub-basin assessment; development of a framework for a McKenzie Watershed Conservation Strategy; an evaluation of Council's monitoring programs - ambient water quality, storm-event water quality, Tier III water quality, and macroinvertebrate monitoring. The Council, in cooperation with the McKenzie River Cooperative, completed habitat enhancements in the Gate Creek and Deer Creek sub-watersheds. This partnership recently submitted Bring Back the Natives grant for initiation of projects in other McKenzie tributaries. The Council will also be working with a local business to develop a river-side riparian enhancement and native landscaping project on the lodge grounds. This will serve as a demonstration project for blending fish and wildlife habitat concerns with maintaining grounds for business opportunities. Accomplishments in the area of procurement of funding included developing the FY2000 Scope of Work and budget for approval by the Council and BPA; providing quarterly budget and work program progress reports to the Council; and securing additional funding from Council partner organizations and foundations. Highlights in the area of watershed education/outreach include the MWC's lead role in convening the Watershed Education Network for teachers as part of its educational mission; production of newsletters and brochures; and coordination of media coverage of watershed-related issues.« less

  20. Michigan's agricultural heritage: using historical data to develop authentic heritage attractions

    Treesearch

    Craig Wiles; Terry Shaffer; Gail Vander Stoep

    2003-01-01

    The Michigan Agricultural Heritage Project, a multi-disciplinary research effort at Michigan State University sponsored by the Michigan Department of Transportation, is currently completing a rural agricultural context document. While the main purpose of this project is to provide information, tools and resources for historic preservation consultants...

  1. 24 CFR 200.72 - Zoning, deed and building restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Zoning, deed and building... Zoning, deed and building restrictions. The project when completed shall not violate any material zoning or deed restrictions applicable to the project site, and shall comply with all applicable building...

  2. Education and Outreach for Breast Imaging and Breast Cancer Patients

    DTIC Science & Technology

    2003-07-01

    funding, which ended in spring, 2003,1 have gained experience in developing three types of patient education materials- a handbook, a video and a...about patient education in future projects. I have also completed data collection on a project, Evaluating the Effect of Informed Consent and

  3. EVALUATING DESIGN AND VERIFYING COMPLIANCE OF CREATED WETLANDS IN THE VICINITY OF TAMPA, FLORIDA

    EPA Science Inventory

    Completed mitigation projects are being studied by the Wetlands Research Program nationwide to identify critical design features, develop methods for evaluating projects, determine the functions they perform, and describe how they change with time. his report is the second in a s...

  4. Competency Profile Development for the Marketing Education Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Smith, Clifton L.

    A project was conducted to revalidate, revise, and adapt/modify the minimum core competencies for the Fundamentals of Marketing and Advanced Marketing courses in secondary marketing education in Missouri. To implement the project, these activities were conducted: (1) each marketing instructor completed a survey instrument for the assessment of…

  5. Vocational Cooking Class. Final Report.

    ERIC Educational Resources Information Center

    Morton, Kathy M.

    A project was conducted to develop a course in cooking skills for high school students interested in preparing for jobs or seeking advanced vocational training in the food service occupations. During the first phase of the project, the course instructor, who is also the head cook at the high school, completed courses in cardiopulmonary…

  6. Interagency Planning: A Case Study in Murphy's Law.

    ERIC Educational Resources Information Center

    Witkin, Belle Ruth

    A partnership project to develop and demonstrate a model for interagency cooperation between school districts and city governments operated for slightly over a year in Emeryville (California). Successful results of the project included collection of needs assessment data, completion of a social services resource guide, reopening of school…

  7. Ecology in the Classroom [Complete Kit].

    ERIC Educational Resources Information Center

    Audubon Naturalist Society of the Central Atlantic States, Inc., Washington, DC.

    Designed specifically for use in inner city schools, this ecology project for grades four through six attempts to help children develop an appreciation of the out-of-doors and an awareness of the natural features of their own environment. The eight-week project consists of units about interdependence, plants, pollination, insects and their…

  8. International Education and Sustainable Development: An American Experience in Bangkok, Venice and Guayaquil.

    ERIC Educational Resources Information Center

    Hansen, Peter H.

    1995-01-01

    Describes environmental projects completed by Worcester Polytechnic Institute students in Bangkok, Venice, and Guayaquil as part of a program studying the interaction of science or technology and society. The lessons provide a model for environmental education at other institutions. These interdisciplinary projects promote environmental awareness…

  9. Comparison of Scientific Research Projects of Education Faculties

    ERIC Educational Resources Information Center

    Altunay, Esen; Tonbul, Yilmaz

    2015-01-01

    Many studies indicate that knowledge and knowledge production are the main predictors of social development, welfare and the ability to face the future with confidence. It could be argued that knowledge production is mainly carried out by universities. This study compares 1266 scientific research projects (SRPs) completed by faculties of education…

  10. An Issues-Based Research Project: National Goals on Trial.

    ERIC Educational Resources Information Center

    DeVille, Priscilla; And Others

    This paper summarizes the results of a research project completed by three doctoral students enrolled in an advanced curriculum development course at the University of Southern Mississippi (Hattiesburg). The students used a mock trial format to consider reasons to support establishment of a national curriculum (concerning the American public's…

  11. 75 FR 71726 - Central Utah Project Completion Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... DEPARTMENT OF THE INTERIOR Central Utah Project Completion Act AGENCY: Department of the Interior..., Orem, Utah 84058-7303. Department of the Interior, Central Utah Project Completion Act Office, 302 East....cupcao.gov . FOR FURTHER INFORMATION: Contact Mr. Lee Baxter, Central Utah Project Completion Act Office...

  12. Pediatric Resident Academic Projects While on Global Health Electives: Ten Years of Experience at the University of Minnesota.

    PubMed

    Pitt, Michael B; Slusher, Tina M; Howard, Cynthia R; Cole, Valerie B; Gladding, Sophia P

    2017-07-01

    Many residency programs require residents to complete an academic project as part of a global health (GH) elective. However, there has been little description of the range of projects residents have pursued during GH electives or the extent to which these projects are consistent with proposed best practices. The authors conducted a document review of 67 written summaries or copies of presentations of academic projects (hereafter, summaries) completed by pediatric and medicine-pediatric residents at the University of Minnesota while on GH electives from 2005 to 2015. Two authors independently coded each summary for the type of project completed; when the project idea was generated; explicit mention of a mentor from the home institution, host institution, or both; whether a needs assessment was conducted; and whether there were plans for sustainability. Most of the 67 projects were categorized into one of three project types: quality/process improvement (28 [42%]), education (18 [27%]), or clinical research (14 [21%]). Most summaries explicitly mentioned a mentor (45 [67%]), reported conducting a needs assessment (38 [57%]), and indicated sustainability plans (45 [67%]). Of the 42 summaries that indicated the timing of idea generation, 30 (71%) indicated the idea was developed after arriving at the host site. Residents undertook a wide range of academic projects during GH electives, most commonly quality/process improvement and education projects. The projects were largely aligned with best practices, with most summaries indicating the resident worked with a mentor, conducted a needs assessment, and made plans for sustainability.

  13. A Comparison of Financing Illinois Unit School Districts for the School Year 1974-75 with the Alternative Financing Models Developed by the National Educational Finance Project.

    ERIC Educational Resources Information Center

    Conti, Dennis R.

    This study compares the present method of financing Illinois public schools for the school year 1973-74 with six alternative financing models developed by the National Educational Finance Project (NEFP). The NEFP models were as follows: complete local support, flat grant with local leeway limit of 12 mills of equalized assessed valuation,…

  14. Existing Whole-House Solutions Case Study: Bay Ridge Gardens - Mixed Humid Affordable Multifamily Housing Deep Energy Retrofit, Annapolis, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-10-01

    Under this project, the BA-PIRC research team evaluated the installation, measured performance, and cost-effectiveness of efficiency upgrade measures for a tenant-in-place deep energy retrofit at the Bay Ridge multifamily development in Annapolis, Maryland. The design and construction phase of the Bay Ridge project was completed in August 2012. This case study summarizes system commissioning, short-term test results, utility bill data analysis, and analysis of real-time data collected over a one-year period after the retrofit was complete.

  15. Space Shuttle External Tank Project status

    NASA Technical Reports Server (NTRS)

    Davis, R. M.

    1980-01-01

    The External Tank Project is reviewed with emphasis on the DDT&E and production phases and the lightweight tank development. It is noted that the DDT&E phase is progressing well with the structural and ground vibration test article programs complete, the propulsion test article program progressing well, and the component qualification and verification testing 92% complete. New tools and facilities are being brought on line to support the increased build rate for the production phase. The lightweight tank, which will provide additional payload in orbit, is progressing to schedule with first delivery in early 1982.

  16. Software for an Experimental Air-Ground Data Link : Volume 2. System Operation Manual

    DOT National Transportation Integrated Search

    1975-10-01

    This report documents the complete software system developed for the Experimental Data Link System which was implemented for flight test during the Air-Ground Data Link Development Program (FAA-TSC- Project Number FA-13). The software development is ...

  17. The engineering design of the Tokamak Physics Experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmidt, J.A.

    A mission and supporting physics objectives have been developed, which establishes an important role for the Tokamak Physics Experiment (TPX) in developing the physic basis for a future fusion reactor. The design of TPX include advanced physics features, such as shaping and profile control, along with the capability of operating for very long pulses. The development of the superconducting magnets, actively cooled internal hardware, and remote maintenance will be an important technology contribution to future fusion projects, such as ITER. The Conceptual Design and Management Systems for TPX have been developed and reviewed, and the project is beginning Preliminary Design.more » If adequately funded the construction project should be completed in the year 2000.« less

  18. OSIRIX: open source multimodality image navigation software

    NASA Astrophysics Data System (ADS)

    Rosset, Antoine; Pysher, Lance; Spadola, Luca; Ratib, Osman

    2005-04-01

    The goal of our project is to develop a completely new software platform that will allow users to efficiently and conveniently navigate through large sets of multidimensional data without the need of high-end expensive hardware or software. We also elected to develop our system on new open source software libraries allowing other institutions and developers to contribute to this project. OsiriX is a free and open-source imaging software designed manipulate and visualize large sets of medical images: http://homepage.mac.com/rossetantoine/osirix/

  19. Large project experiences with object-oriented methods and reuse

    NASA Technical Reports Server (NTRS)

    Wessale, William; Reifer, Donald J.; Weller, David

    1992-01-01

    The SSVTF (Space Station Verification and Training Facility) project is completing the Preliminary Design Review of a large software development using object-oriented methods and systematic reuse. An incremental developmental lifecycle was tailored to provide early feedback and guidance on methods and products, with repeated attention to reuse. Object oriented methods were formally taught and supported by realistic examples. Reuse was readily accepted and planned by the developers. Schedule and budget issues were handled by agreements and work sharing arranged by the developers.

  20. Rapidly Deployable Security System Final Report CRADA No. TC-2030-01

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohlhepp, V.; Whiteman, B.; McKibben, M. T.

    The ultimate objective of the LEADER and LLNL strategic partnership was to develop and commercialize_a security-based system product and platform for the use in protecting the substantial physical and economic assets of the government and commerce of the United States. The primary goal of this project was to integrate video surveillance hardware developed by LLNL with a security software backbone developed by LEADER. Upon completion of the project, a prototype hardware/software security system that is highly scalable was to be demonstrated.

  1. Advanced Stirling Radioisotope Generator Engineering Unit 2 (ASRG EU2) Final Assembly

    NASA Technical Reports Server (NTRS)

    Oriti, Salvatore M.

    2015-01-01

    NASA Glenn Research Center (GRC) has recently completed the assembly of a unique Stirling generator test article for laboratory experimentation. Under the Advanced Stirling Radioisotope Generator (ASRG) flight development contract, NASA GRC initiated a task to design and fabricate a flight-like generator for in-house testing. This test article was given the name ASRG Engineering Unit 2 (EU2) as it was effectively the second engineering unit to be built within the ASRG project. The intent of the test article was to duplicate Lockheed Martin's qualification unit ASRG design as much as possible to enable system-level tests not previously possible at GRC. After the cancellation of the ASRG flight development project, the decision was made to continue the EU2 build, and make use of a portion of the hardware from the flight development project. GRC and Lockheed Martin engineers collaborated to develop assembly procedures, leveraging the valuable knowledge gathered by Lockheed Martin during the ASRG development contract. The ASRG EU2 was then assembled per these procedures at GRC with Lockheed Martin engineers on site. The assembly was completed in August 2014. This paper details the components that were used for the assembly, and the assembly process itself.

  2. [Adverse events management. Methods and results of a development project].

    PubMed

    Rabøl, Louise Isager; Jensen, Elisabeth Brøgger; Hellebek, Annemarie H; Pedersen, Beth Lilja

    2006-11-27

    This article describes the methods and results of a project in the Copenhagen Hospital Corporation (H:S) on preventing adverse events. The aim of the project was to raise awareness about patients' safety, test a reporting system for adverse events, develop and test methods of analysis of events and propagate ideas about how to prevent adverse events. H:S developed an action plan and a reporting system for adverse events, founded an organization and developed an educational program on theories and methods of learning from adverse events for both leaders and employees. During the three-year period from 1 January 2002 to 31 December 2004, the H:S staff reported 6011 adverse events. In the same period, the organization completed 92 root cause analyses. More than half of these dealt with events that had been optional to report, the other half events that had been mandatory to report. The number of reports and the front-line staff's attitude towards reporting shows that the H:S succeeded in founding a safety culture. Future work should be centred on developing and testing methods that will prevent adverse events from happening. The objective is to suggest and complete preventive initiatives which will help increase patient safety.

  3. Visualization of Atmospheric Water Vapor Data for SAGE

    NASA Technical Reports Server (NTRS)

    Kung, Mou-Liang; Chu, W. P. (Technical Monitor)

    2000-01-01

    The goal of this project was to develop visualization tools to study the water vapor dynamics using the Stratospheric Aerosol and Gas Experiment 11 (SAGE 11) water vapor data. During the past years, we completed the development of a visualization tool called EZSAGE, and various Gridded Water Vapor plots, tools deployed on the web to provide users with new insight into the water vapor dynamics. Results and experiences from this project, including papers, tutorials and reviews were published on the main Web page. Additional publishing effort has been initiated to package EZSAGE software for CD production and distribution. There have been some major personnel changes since Fall, 1998. Dr. Mou-Liang Kung, a Professor of Computer Science assumed the PI position vacated by Dr. Waldo Rodriguez who was on leave. However, former PI, Dr. Rodriguez continued to serve as a research adviser to this project to assure smooth transition and project completion. Typically in each semester, five student research assistants were hired and trained. Weekly group meetings were held to discuss problems, progress, new research direction, and activity planning. Other small group meetings were also held regularly for different objectives of this project. All student research assistants were required to submit reports for conference submission.

  4. China as an Evolving Metro-Agro-Plex (China-MAP)

    NASA Technical Reports Server (NTRS)

    Chameides, William L.; Bergin, M.; Carmichael, G.; Dickinson, R.; Giorgi, F.; Kiang, C. S.; Levy, H., II; Kasibhatla, P.; Mearns, L.; Ramaswamy, V.

    2002-01-01

    The one-year NASA-funded project was implemented to complete the analyses and model-simulations undertaken under the auspices of the 3-year research effort supported by NASA as an Interdisciplinary Earth System Science Investigation (IDS) entitled: China As An Evolving Metro-Agro-Plex (China-MAP). The primary goal of China-MAP was to assess the effects of economic development and the regional environmental changes it engenders upon agriculture in China. The project was carried out as part of the Sino-U.S. Science and Technology Protocol in the Atmospheric Sciences, an official government-to-government agreement that establishes the parameters for joint research projects between the two nations in the atmospheric sciences. The NASA-funded portion of the project focused on the development and application of a regional coupled climate/chemical transport model for East Asia (i.e., RegChem-CM). The funds provided under the subject 1-year project were used to: (1) complete specific investigations undertaken by the China-MAP Science Team using the Reg-Chem-CM expended; and (2) document the results of these and other China-MAP investigations in the peer-reviewed literature. A summary of these specific investigations in provided.

  5. Development of Production-Intent Plug-In Hybrid Vehicle Using Advanced Lithium-Ion Battery Packs with Deployment to a Demonstration Fleet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    No, author

    2013-09-29

    The primary goal of this project was to speed the development of one of the first commercially available, OEM-produced plug-in hybrid electric vehicles (PHEV). The performance of the PHEV was expected to double the fuel economy of the conventional hybrid version. This vehicle program incorporated a number of advanced technologies, including advanced lithium-ion battery packs and an E85-capable flex-fuel engine. The project developed, fully integrated, and validated plug-in specific systems and controls by using GM’s Global Vehicle Development Process (GVDP) for production vehicles. Engineering Development related activities included the build of mule vehicles and integration vehicles for Phases I &more » II of the project. Performance data for these vehicles was shared with the U.S. Department of Energy (DOE). The deployment of many of these vehicles was restricted to internal use at GM sites or restricted to assigned GM drivers. Phase III of the project captured the first half or Alpha phase of the Engineering tasks for the development of a new thermal management design for a second generation battery module. The project spanned five years. It included six on-site technical reviews with representatives from the DOE. One unique aspect of the GM/DOE collaborative project was the involvement of the DOE throughout the OEM vehicle development process. The DOE gained an understanding of how an OEM develops vehicle efficiency and FE performance, while balancing many other vehicle performance attributes to provide customers well balanced and fuel efficient vehicles that are exciting to drive. Many vehicle content and performance trade-offs were encountered throughout the vehicle development process to achieve product cost and performance targets for both the OEM and end customer. The project team completed two sets of PHEV development vehicles with fully integrated PHEV systems. Over 50 development vehicles were built and operated for over 180,000 development miles. The team also completed four GM engineering development Buy-Off rides/milestones. The project included numerous engineering vehicle and systems development trips including extreme hot, cold and altitude exposure. The final fuel economy performance demonstrated met the objectives of the PHEV collaborative GM/DOE project. Charge depletion fuel economy of twice that of the non-PHEV model was demonstrated. The project team also designed, developed and tested a high voltage battery module concept that appears to be feasible from a manufacturability, cost and performance standpoint. The project provided important product development and knowledge as well as technological learnings and advancements that include multiple U.S. patent applications.« less

  6. Nevada National Security Site Industrial Sites Project Closeout - 12498

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin; Krauss, Mark; Matthews, Pat

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the endmore » of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)« less

  7. Texas Clean Energy Project: Topical Report, Phase 1 - February 2010-December 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattes, Karl

    2012-11-01

    Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a syntheticmore » gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In December 2011, STCE executed fixed-price turnkey EPC contracts and a long-term O&M agreement with industry-leading contractors.. Other work completed during Phase 1 includes execution of all major commercial input and offtake agreements. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. An MOU for natural gas supply was completed with ONEOK, and a long-term water supply agreement was completed with a private landowner. In addition, STCE secured options for easements and rights-of-way, completed a transmission study, executed an interconnection agreement and devoted substantial effort to debt and conventional and tax equity structuring to position the Project for project financing, currently scheduled for closing on December 31, 2012.« less

  8. Introduction to SIMRAND: Simulation of research and development project

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1982-01-01

    SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.

  9. 1967-1968 Project Reports by Faculty Members of San Joaquin Delta College: A Project under Title III, Higher Education Act of 1965.

    ERIC Educational Resources Information Center

    Bullard, Richard F., Ed.

    These 17 curriculum studies by faculty members of San Joaquin Delta Junior College were funded under Title III of The Higher Education Act of 1965. They were intended to help initiate new courses, improve existing ones, or plan for future ones. Each project report gave its objective(s), the general methods for its development and completion, the…

  10. Integrated Modeling and Analysis of Physical Oceanographic and Acoustic Processes

    DTIC Science & Technology

    2015-09-30

    goal is to improve ocean physical state and acoustic state predictive capabilities. The goal fitting the scope of this project is the creation of... Project -scale objectives are to complete targeted studies of oceanographic processes in a few regimes, accompanied by studies of acoustic propagation...by the basic research efforts of this project . An additional objective is to develop improved computational tools for acoustics and for the

  11. 24 CFR 954.507 - Submission of project completion reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... request for the project. If a satisfactory Project Completion Report is not submitted by the due date, HUD... approvals will remain suspended until a satisfactory Project Completion Report is received. (Approved by the...

  12. CFRP composite optical telescope assembly for the 1 m ULTRA project

    NASA Astrophysics Data System (ADS)

    Martin, Robert N.; Romeo, Robert C.

    2006-06-01

    The focus of the ULTRA Project is to develop and test Ultra-Lightweight Technology for Research applications in Astronomy. The ULTRA project is a collaborative effort involving the private firm Composite Mirror Applications, Inc (CMA) and 3 universities: University of Kansas, San Diego State University, and Dartmouth College. Funding for ULTRA is predominately from a NSF three year MRI program grant to CMA and KU with additional support from CMA, KU and SDSU. The goal of the ULTRA program is to demonstrate that a viable alternative exists to traditional glass mirror and steel telescope technology by designing, fabricating and testing a research telescope constructed from carbon fiber reinforced plastic (CFRP) materials. In particular, a 1m diameter, Cassegrain telescope optics set and optical tube assembly (OTA) are being designed and fabricated by CMA. The completed telescope will be deployed at SDSU's Mt Laguna Observatory in a refurbished structure (new dome and mount provided via KU and SDSU). We expect that a successful completion and testing of this project will lead to future use of CFRP technology in larger telescopes and segmented telescopes. This paper describes the OTA (optical tube assembly) that has been developed for the ULTRA project. The mirror technology is described in another paper in this conference. A poster describes the ULTRA project overview in more detail.

  13. Investigation on factors that contribute to the abandonment of building in construction industry in Malaysia

    NASA Astrophysics Data System (ADS)

    Farhayu Ariffin, Nur; Jaafar, Mohd Faizal Md; Idris Ali, Mohamad; Irwan Ramli, Noram; Muthusamy, Khairunisa; Shukor Lim, Nor Hasanah Abdul

    2018-03-01

    In Malaysia, the construction sector is one of the important sectors that contribute to economic growth and employments. However, a major concern facing the construction industry is the growing rate of delays in project delivery. In the worse cases, the projects were abandoned due to some reasons when the contract period ended. Abandoned building defines as construction work that has been continuously stalled for 6 months or more, during the project completion period or beyond the scheduled date of completion. When the projects become abandoned, it gives an adverse effect on many parties such as the developer, contractor, consultant and also client. According to previous researchers, the abandonment of building causes a serious problem and need some mitigation plan to avoid this problem from occurring. This study will investigate the fundamental factors that contribute to the abandonment of building and projects in Malaysia based on the current data of the abandoned building in most states in Malaysia. The data was collected from the respondents who is in the construction industry and had experience working with abandoned housing project. Form the respondents perspective, it shows that the main factor contribute to the building abandonment is due to the financial problem facing by the developer company.

  14. An assessment strategy for proposals of engineering projects in the Bachelor of Biomedical Engineering Curriculum at Universidad Autónoma Metropolitana-Iztapalapa.

    PubMed

    Castañeda-Villa, N; Jiménez-González, A; Ortiz-Posadas, M R

    2015-08-01

    Since 1974, the Bachelor of Biomedical Engineering Program (BBME) is offered at Universidad Autónoma Metropolitana-Iztapalapa, in Mexico City. By design, it must be completed in four years (12 trimesters) and, in the latter three, the senior students work on a BME project, which is done by completing three modules: Project Seminar (PS), Project on BME I and Project on BME II. In the PS module, the student must find a problem of interest in the BME field and suggest a solution through the development of an Engineering Project Proposal (EPP). Currently, the module is being taught by two faculty members of the BBME, who instruct students on how to develop their EPPs and evaluate their progress by reviewing a number of EPPs during the trimester. This generates a huge workload for the module instructors, which makes it necessary to involve more faculty members trimester-to-trimester (i.e. every 12 weeks) and, therefore, to create a set of systematic guidelines that ease the evaluation process for new instructors. Hence, the purpose of this paper is to present an assessment strategy (in the form of an assessment matrix) for the PS module as well as some preliminary results after two trimesters of its implementation.

  15. Evaluating the completeness of the national ALS registry, United States.

    PubMed

    Kaye, Wendy E; Wagner, Laurie; Wu, Ruoming; Mehta, Paul

    2018-02-01

    Our objective was to evaluate the completeness of the United States National ALS Registry (Registry). We compared persons with ALS who were passively identified by the Registry with those actively identified in the State and Metropolitan Area ALS Surveillance project. Cases in the two projects were matched using a combination of identifiers, including, partial social security number, name, date of birth, and sex. The distributions of cases from the two projects that matched/did not match were compared and Chi-square tests conducted to determine statistical significance. There were 5883 ALS cases identified by the surveillance project. Of these, 1116 died before the Registry started, leaving 4767 cases. We matched 2720 cases from the surveillance project to those in the Registry. The cases identified by the surveillance project that did not match cases in the Registry were more likely to be non-white, Hispanic, less than 65 years of age, and from western states. The methods used by the Registry to identify ALS cases, i.e. national administrative data and self-registration, worked well but missed cases. These findings suggest that developing strategies to identify and promote the Registry to those who were more likely to be missing, e.g. non-white and Hispanic, could be beneficial to improving the completeness of the Registry.

  16. Renewable energy projects in the Dominican Republic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Viani, B.

    1997-12-01

    This paper describes a US/Dominican Republic program to develop renewable energy projects in the country. The objective is to demonstrate the commercial viability of renewable energy generation projects, primarily small-scale wind and hydropower. Preliminary studies are completed for three micro-hydro projects with a total capacity of 262 kWe, and two small wind power projects for water pumping. In addition wind resource assessment is ongoing, and professional training and technical assistance to potential investors is ongoing. Projects goals include not less than ten small firms actively involved in installation of such systems by September 1998.

  17. Developing a prediction model for Armillaria solidipes in Arizona

    Treesearch

    N. B. Klopfenstein; J. W Hanna; M. L. Fairweather; J. D. Shaw; R. Mathiasen; C. Hoffman; E. Nelson; M. -S. Kim; A. L. Ross-Davis

    2012-01-01

    In 2010, a collaborative project was started to determine the distribution of Armillaria solidipes (= A. ostoyae) in Arizona. The methods and preliminary accomplishments of the 2010 and 2011 (ongoing) field surveys/collections are summarized. During the next phase of this project, surveys will be completed and remaining Armillaria isolates will be identified using DNA-...

  18. Supervisors' Perceptions of Research Competencies in the Final-Year Project

    ERIC Educational Resources Information Center

    Reguant, Mercedes; Martínez-Olmo, Francesc; Contreras-Higuera, Williams

    2018-01-01

    Background: This paper analyses the development of research competencies in higher education students, particularly with regard to the undergraduate Final-Year Project (FYP). The FYP is understood as an assignment that requires the integration of learning outcomes and demonstration of competencies for the successful completion of the degree.…

  19. 75 FR 18231 - Central Utah Project Completion Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... a proposed conversion of up to 12,100 acre feet of Central Utah Project (CUP) Bonneville Unit water... that has been made available under Block Notice 1A of the CUP. The delivery area could be expanded to include additional land in Wasatch County. The Bonneville Unit of the CUP was authorized to develop a...

  20. 77 FR 74491 - Notice of Proposed Information Collection: Comment Request Community Development Block Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... other available information. FOR FURTHER INFORMATION CONTACT: Steve Johnson, Director, Entitlement... evaluation of the completion status of the project or activity; (D) an estimate of the number of jobs created and the number of jobs retained by the project or activity; and (E) for infrastructure investments...

  1. Teaching Integrity in Empirical Research: A Protocol for Documenting Data Management and Analysis

    ERIC Educational Resources Information Center

    Ball, Richard; Medeiros, Norm

    2012-01-01

    This article describes a protocol the authors developed for teaching undergraduates to document their statistical analyses for empirical research projects so that their results are completely reproducible and verifiable. The protocol is guided by the principle that the documentation prepared to accompany an empirical research project should be…

  2. CENTER FOR THE STUDY OF METALS IN THE ENVIRONMENT

    EPA Science Inventory

    The research program will be expanded in Year 2.  The SAC reviewed a series of proposals for research projects.  Nine projects were approved for funding.  Planning has been carried out with the SAC to allow the development of the UWM to be completed in a 3-year ...

  3. "Making Time for What Matters Most." I3 Development Project: Year 5 Evaluation Report

    ERIC Educational Resources Information Center

    Donahue, Tara; Ho, Hsiang-Yah; Knotts, Ashli

    2015-01-01

    The purpose of this study evaluates the work completed in the "Jefferson County Public Schools" (JCPS) project, "Making Time for What Matters Most", aiming to improve student achievement, narrow achievement gaps, strengthen students' college readiness skills, and increase the percentages of students who graduate and go on to…

  4. If Walls Could Talk

    ERIC Educational Resources Information Center

    Landay, Eileen; Wootton, Kurt

    2013-01-01

    As Len Newman looked for a big idea around which to center the year's work for his students at Central Falls High School in Central Falls, Rhode Island, he recalled a professional development program he had completed at Brown University in the ArtsLiteracy Project's lab school. The project was comprised of groups who designed their courses around…

  5. Computer-Assisted Bilingual/Bicultural Multiskills Project, 1987-1988. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Carey, Cecilia

    The Computer-Assisted Bilingual/Bicultural Multiskills Project completed its first year of an extension grant. The program used computerized and non-computerized instruction to help 109 native speakers of Haitian Creole/French and Spanish, most of whom were recent immigrants, develop English-as-a-Second-Language (ESL) native language, and content…

  6. TRU waste absorbent addition project at the Idaho National Engineering and Environmental Laboratory.

    PubMed

    Colson, R Griff; Auman, Laurence E

    2003-08-01

    ABSTRACT In order to meet a commitment to ship 3,100 m3 of transuranic waste to the Waste Isolation Pilot Plant (WIPP), the Idaho National Engineering and Environmental Laboratory (INEEL) developed a process to add absorbent to TRU waste drums that did not meet WIPP waste acceptance criteria. The development, implementation, and safe completion of this project contributed to the INEEL's success in meeting the commitment three months early.

  7. Learning Activity Packets for Minimal Mathematics Competencies in Vocational Education. Exemplary Project in Vocational Education Conducted under Public Law 90-576, Section 132 of P.L. 94-482. Final Report.

    ERIC Educational Resources Information Center

    Dorchester Vocational Center, SC.

    Project activities were conducted to accomplish three major objectives: (1) to develop a definition of minimum mathematical skills necessary to complete vocational skill training in fifteen areas, (2) to develop learning activity packets relevant to each vocational area, and (3) to make the process and packets available to other vocational…

  8. Global agenda, local health: including concepts of health security in preparedness programs at the jurisdictional level.

    PubMed

    Eby, Chas

    2014-01-01

    The Global Health Security Agenda's objectives contain components that could help health departments address emerging public health challenges that threaten the population. As part of the agenda, partner countries with advanced public health systems will support the development of infrastructure in stakeholder health departments. To facilitate this process and augment local programs, state and local health departments may want to include concepts of health security in their public health preparedness offices in order to simultaneously build capacity. Health security programs developed by public health departments should complete projects that are closely aligned with the objectives outlined in the global agenda and that facilitate the completion of current preparedness grant requirements. This article identifies objectives and proposes tactical local projects that run parallel to the 9 primary objectives of the Global Health Security Agenda. Executing concurrent projects at the international and local levels in preparedness offices will accelerate the completion of these objectives and help prevent disease epidemics, detect health threats, and respond to public health emergencies. Additionally, future funding tied or related to health security may become more accessible to state and local health departments that have achieved these objectives.

  9. Nevada Test Site-Directed Research and Development, FY 2007 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wil Lewis, editor

    2008-02-20

    The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving frommore » SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL), and NNSA sources. This tool continues to be of considerable value in aligning the SDRD program with mission priorities, and was expanded in FY 2007 to include technology development needs from the DHS and other agencies with missions closely aligned to that of the NTS.« less

  10. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

  11. Improved Training Method for Rapid Rehabilitation of Amputees

    DTIC Science & Technology

    2015-05-01

    Falls Overall Project Summary This report describes a four year research effort to develop and test a novel training technique aimed at increasing...month post training assessment. One subject moved after completing the training and did not return for follow-up. Three subjects failed to respond to...training (n=5) Reasons: Moved, revisions, suicide attempt, time conflict Completed Training (n= 20) Completed post - testing (n=20). Lost to

  12. Experiences of Mentorship with Academic Staff Doctoral Candidates at a South African University

    ERIC Educational Resources Information Center

    Strebel, Anna; Shefer, Tamara

    2016-01-01

    Given the growing emphasis on academic research output and the challenges encountered in expediting completion of doctoral studies especially, mentorship is increasingly being utilised as a capacity development strategy for supporting scholars to complete post-graduate studies. This article reports on a mentorship project aimed at academic staff…

  13. Introducing and Developing Map Skills with Persons Having Mild or Moderate Learning Difficulties.

    ERIC Educational Resources Information Center

    Renfrew, Tom

    1997-01-01

    A British project found that appropriate training in map skills enabled children and adults with mild mental retardation to complete a white color-coded orienteering course with minimal assistance but that persons with moderate mental retardation required more assistance and instruction time to complete course objectives. Describes approaches to…

  14. Fill in the blank: culture jamming and the advertising of agency.

    PubMed

    Lambert-Beatty, Carrie

    2010-01-01

    This article is a review on billboard liberation and some other proj-ects that develop the idea of talking back or over advertising in a playful and youthful way. In one of them, Ji Lee's Bubble Project, an artist places blank thought-bubble stickers on street advertisements and waits to see what people write on them, completing the work of art and transgression. In other initiative, blank pages with the word God were placed around the city in place of advertising, inviting people to complete the prayer/complaint and to participate in a Suggestion Box, a project that collected "suggestions" from people out in the street. A review of playful and youthful ways to "rebel" against the impositions of powers like media and advertising.

  15. FOX: A Fault-Oblivious Extreme-Scale Execution Environment Boston University Final Report Project Number: DE-SC0005365

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Appavoo, Jonathan

    Exascale computing systems will provide a thousand-fold increase in parallelism and a proportional increase in failure rate relative to today's machines. Systems software for exascale machines must provide the infrastructure to support existing applications while simultaneously enabling efficient execution of new programming models that naturally express dynamic, adaptive, irregular computation; coupled simulations; and massive data analysis in a highly unreliable hardware environment with billions of threads of execution. The FOX project explored systems software and runtime support for a new approach to the data and work distribution for fault oblivious application execution. Our major OS work at Boston University focusedmore » on developing a new light-weight operating systems model that provides an appropriate context for both multi-core and multi-node application development. This work is discussed in section 1. Early on in the FOX project BU developed infrastructure for prototyping dynamic HPC environments in which the sets of nodes that an application is run on can be dynamically grown or shrunk. This work was an extension of the Kittyhawk project and is discussed in section 2. Section 3 documents the publications and software repositories that we have produced. To put our work in context of the complete FOX project contribution we include in section 4 an extended version of a paper that documents the complete work of the FOX team.« less

  16. Labor productivity, perceived effectiveness, and sustainability of innovative projects.

    PubMed

    Makai, Peter; Cramm, Jane M; van Grotel, Marloes; Nieboer, Anna P

    2014-01-01

    To assess labor productivity, perceived effectiveness, and sustainability of a national quality program that sought to stimulate efficiency gains through increased labor productivity while maintaining quality through implementing small-scale innovation projects. Longitudinal measures of labor productivity and quality were collected at baseline and after completion of the innovation projects. Perceived effectiveness and sustainability (measured by routinization) were assessed cross-sectionally after project completion. This study was conducted in The Netherlands. Ninety-eight improvement projects in long-term care organizations. A national quality program to stimulate innovative approaches in long-term care. Labor productivity, perceived effectiveness, and sustainability were the main outcome measures. Labor productivity data were available for only 37 (38%) of the 98 projects, 33 (89%) of which demonstrated significantly improved efficiency. Perceived effectiveness was significantly associated with sustainability (0.29; p < .05), but not labor productivity. To achieve sustainability in long-term care, developers of innovative projects must collect better quality information on efficiency gains in terms of labor productivity and focus more on efficiency improvement. More research is necessary to explore relationships between labor productivity, perceived effectiveness, and sustainability. © 2012 National Association for Healthcare Quality.

  17. Lessons learned: the switch from VMS to UNIX operations for the STScI's Science and Mission Scheduling Branch

    NASA Astrophysics Data System (ADS)

    Adler, David S.; Workman, William M., III; Chance, Don

    2004-09-01

    The Science and Mission Scheduling Branch (SMSB) of the Space Telescope Science Institute (STScI) historically operated exclusively under VMS. Due to diminished support for VMS-based platforms at STScI, SMSB recently transitioned to Unix operations. No additional resources were available to the group; the project was SMSB's to design, develop, and implement. Early decisions included the choice of Python as the primary scripting language; adoption of Object-Oriented Design in the development of base utilities; and the development of a Python utility to interact directly with the Sybase database. The project was completed in January 2004 with the implementation of a GUI to generate the Command Loads that are uplinked to HST. The current tool suite consists of 31 utilities and 271 tools comprising over 60,000 lines of code. In this paper, we summarize the decision-making process used to determine the primary scripting language, database interface, and code management library. We also describe the finished product and summarize lessons learned along the way to completing the project.

  18. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parrish, Kristen

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  19. The DOE/Gosatomnadzor collaboration, Project 3: Providing equipment and support for Gosatomnadzor inspection activities in Russia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoida, H.W.; Lanier, R.; Schultz, F.

    1997-12-31

    Project 3 consists of two subprojects: Project 3.1 -- providing Materials Control and Accounting (MC and A) equipment to GAN inspectors; and Project 3.2 -- the development of Russian indigenous MC and A equipment capability for GAN. The objective of Project 3.1 is to provide equipment for use by GAN inspectors during independent inspections of facilities that contain direct-use material. To accomplish this, Project 3.1 develops the initial training for GAN instructors on the instruments provided by the US and contracts with Safety Limited, a GAN contractor for developing methodologies and procedures for using the equipment and acceptance checkout andmore » delivery. The equipment deliveries were divided into three phases to fit within the DOE budget and priority constraints. With the equipment delivered to the inspectors, Phase 1 is complete. Phase 2 has been started by purchasing and checking out neutron coincidence counting (NCC) equipment at Los Alamos. The GAN instructors have been trained on NCCs, cherenkov vision devices (CVDs), ultrasonic thickness gages (UTGs), and tamper indicating devices (TIDs) at Los Alamos. Phase 3 has been delayed to fiscal year 1999 (FY99) due to budget constraints. Project 3.2 addresses the important issue of sustainability for safeguards equipment in Russia. GAN`s Project 3.2 will help establish indigenous equipment for Russian safeguards. The initial review of Russian manufacturing capabilities for safeguards equipment has been completed and recommendations have been made. To this end, the authors are encouraging US vendors to collaborate with Russian institutes and have contracted with the All-Russia Research Institute of Automatics (VINIIA) and Aquila Technologies to fabricate a Russian Active-Well Coincidence Counter (AWCC) from US parts.« less

  20. 2010 ESMD Faculty Fellowship Project

    NASA Technical Reports Server (NTRS)

    Carmen, Christina L.; Morris, Tommy; Schmidt, Peter; van Susante, Paul; Zalewski, Janusz; Murphy, Gloria

    2010-01-01

    This slide presentation reviews is composed of 6 individual sections. The first is a introductory section that explains the Exploration Systems Mission Directorate (ESMD) Faculty Fellowship Project, the purpose of which is to prepare selected university faculty to work with senior design students to complete projects that have potential to contribute to NASA objectives. The following university presentations represent the chosen projects: (1) the use of Exploration Toolset for the Optimization of Launch and Space Systems (X-TOOLSS) to optimize the Lunar Wormbot design; (2) development of Hardware Definition Language (HDL) realization of ITU G.729 for FGPA; (3) cryogenic fluid and electrical quick connect system and a lunar regolith design; (4) Lunar Landing Pad development; and (5) Prognostics for complex systems.

  1. Development of Life Support System Technologies for Human Lunar Missions

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Ewert, Michael K.

    2009-01-01

    With the Preliminary Design Review (PDR) for the Orion Crew Exploration Vehicle planned to be completed in 2009, Exploration Life Support (ELS), a technology development project under the National Aeronautics and Space Administration s (NASA) Exploration Technology Development Program, is focusing its efforts on needs for human lunar missions. The ELS Project s goal is to develop and mature a suite of Environmental Control and Life Support System (ECLSS) technologies for potential use on human spacecraft under development in support of U.S. Space Exploration Policy. ELS technology development is directed at three major vehicle projects within NASA s Constellation Program (CxP): the Orion Crew Exploration Vehicle (CEV), the Altair Lunar Lander and Lunar Surface Systems, including habitats and pressurized rovers. The ELS Project includes four technical elements: Atmosphere Revitalization Systems, Water Recovery Systems, Waste Management Systems and Habitation Engineering, and two cross cutting elements, Systems Integration, Modeling and Analysis, and Validation and Testing. This paper will provide an overview of the ELS Project, connectivity with its customers and an update to content within its technology development portfolio with focus on human lunar missions.

  2. Advanced Refrigerator/Freezer Technology Development. Technology Assessment

    NASA Technical Reports Server (NTRS)

    Gaseor, Thomas; Hunter, Rick; Hamill, Doris

    1996-01-01

    The NASA Lewis Research Center, through contract with Oceaneering Space Systems, is engaged in a project to develop advanced refrigerator/freezer (R/F) technologies for future Life and Biomedical Sciences space flight missions. The first phase of this project, a technology assessment, has been completed to identify the advanced R/F technologies needed and best suited to meet the requirements for the five R/F classifications specified by Life and Biomedical Science researchers. Additional objectives of the technology assessment were to rank those technologies based on benefit and risk, and to recommend technology development activities that can be accomplished within this project. This report presents the basis, the methodology, and results of the R/F technology assessment, along with technology development recommendations.

  3. Latest developments on documentary film ``The State of the Unit: The Kilogram''

    NASA Astrophysics Data System (ADS)

    Young, Amy

    2013-03-01

    This presentation shows the recent developments in the documentary film project ``The State of the Unit.'' The film, to be completed Fall 2013, looks at historical and current efforts to define precisely the unit of mass.

  4. FEASIBILITY STUDY ON EXECUTIVE PROGRAM DEVELOPMENT FOR BASIN ECOSYSTEMS MODELING

    EPA Science Inventory

    The project was undertaken in order to provide a feasibility study in developing and implementing a complete executive program to interface automatically various basin-wide water quality models for use by relatively inexperienced modelers. This executive program should ultimately...

  5. Advanced imaging system

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This document describes the Advanced Imaging System CCD based camera. The AIS1 camera system was developed at Photometric Ltd. in Tucson, Arizona as part of a Phase 2 SBIR contract No. NAS5-30171 from the NASA/Goddard Space Flight Center in Greenbelt, Maryland. The camera project was undertaken as a part of the Space Telescope Imaging Spectrograph (STIS) project. This document is intended to serve as a complete manual for the use and maintenance of the camera system. All the different parts of the camera hardware and software are discussed and complete schematics and source code listings are provided.

  6. Composites for Advanced Space Transportation Systems (CASTS)

    NASA Technical Reports Server (NTRS)

    Davis, J. G., Jr. (Compiler)

    1979-01-01

    A summary is given of the in-house and contract work accomplished under the CASTS Project. In July 1975 the CASTS Project was initiated to develop graphite fiber/polyimide matrix (GR/PI) composite structures with 589K (600 F) operational capability for application to aerospace vehicles. Major tasks include: (1) screening composites and adhesives, (2) developing fabrication procedures and specifications, (3) developing design allowables test methods and data, and (4) design and test of structural elements and construction of an aft body flap for the Space Shuttle Orbiter Vehicle which will be ground tested. Portions of the information are from ongoing research and must be considered preliminary. The CASTS Project is scheduled to be completed in September 1983.

  7. KSC History Project

    NASA Technical Reports Server (NTRS)

    Moore, Patrick K.

    2002-01-01

    The 2002 NASA/ASEE KSC History Project focused on a series of seven history initiatives designed to acquire, preserve, and interpret the history of Kennedy Space Center. These seven projects included the co-authoring of Voices From the Cape, historical work with NASA historian Roger Launius, the completion of a series of oral histories with key KSC personnel, a monograph on Public Affairs, the development of a Historical Concept Map (CMap) for history knowledge preservation, advice on KSC history database and web interface capabilities, the development of a KSC oral history program and guidelines of training and collection, and the development of collaborative relationships between Kennedy Space Center, the University of West Florida, and the University of Central Florida.

  8. NASA GRC Technology Development Project for a Stirling Radioisotope Power System

    NASA Technical Reports Server (NTRS)

    Thieme, Lanny G.; Schreiber, Jeffrey G.

    2000-01-01

    NASA Glenn Research Center (GRC), the Department of Energy (DOE), and Stirling Technology Company (STC) are developing a Stirling convertor for an advanced radioisotope power system to provide spacecraft on-board electric power for NASA deep space missions. NASA GRC is conducting an in-house project to provide convertor, component, and materials testing and evaluation in support of the overall power system development. A first characterization of the DOE/STC 55-We Stirling Technology Demonstration Convertor (TDC) under the expected launch random vibration environment was recently completed in the NASA GRC Structural Dynamics Laboratory. Two TDCs also completed an initial electromagnetic interference (EMI) characterization at NASA GRC while being tested in a synchronized, opposed configuration. Materials testing is underway to support a life assessment of the heater head, and magnet characterization and aging tests have been initiated. Test facilities are now being established for an independent convertor performance verification and technology development. A preliminary Failure Mode Effect Analysis (FMEA), initial finite element analysis (FEA) for the linear alternator, ionizing radiation survivability assessment, and radiator parametric study have also been completed. This paper will discuss the status, plans, and results to date for these efforts.

  9. Solar electric thermal hydronic (SETH) product development project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stickney, B.L.; Sindelar, A.

    Positive Energy, Inc. received a second Technology Maturation and Commercialization Project Subcontract during the 1999 round of awards. This Subcontract is for the purpose of further aiding Positive Energy, Inc. in preparing its Solar Electric Thermal Hydronic (SETH) control and distribution package for market introduction. All items of this subcontracted project have been successfully completed. This Project Report contains a summary of the progress made during the SETH Development Project (the Project) over the duration of the 1999 Subcontract. It includes a description of the effort performed and the results obtained in the pursuit of intellectual property protection and developmentmore » of product documentation for the end users. This report also summarizes additional efforts taken by and for the SETH project outside of the Subcontract. It presents a chronology of activities over the duration of the Subcontract, and includes a few selected sample copies of documents offered as evidence of their success.« less

  10. The Importance of Bonding to School for Healthy Development: Findings from the Social Development Research Group

    ERIC Educational Resources Information Center

    Catalano, Richard F.; Haggerty, Kevin P.; Oesterle, Sabrina; Fleming, Charles B.; Hawkins, J. David

    2004-01-01

    This paper summarizes investigations of school connectedness completed by the Social Development Research Group in two longitudinal studies, the Seattle Social Development Project and Raising Healthy Children. The theoretical importance of school connectedness, empirical support for the theoretical propositions of the impact of school…

  11. Bringing Curriculum to Life. Enacting Project-Based Learning in Music Programs

    ERIC Educational Resources Information Center

    Tobias, Evan S.; Campbell, Mark Robin; Greco, Phillip

    2015-01-01

    At its core, project-based learning is based on the idea that real-life problems capture student interest, provoke critical thinking, and develop skills as they engage in and complete complex undertakings that typically result in a realistic product, event, or presentation to an audience. This article offers a starting point for music teachers who…

  12. An Analysis of Excellent Early Educational Practices: Preliminary Report.

    ERIC Educational Resources Information Center

    White, Burton L.

    This document reports the first phase of a longitudinal research project designed to produce information on how to raise children so their basic abilities may develop optimally during the first six years of life. Although this Preschool Project has been in operation five years, the study is not yet completed because statements about the effects of…

  13. The NASA In-Space Propulsion Technology Project's Current Products and Future Directions

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Dankanich, John; Munk, Michelle M.; Pencil, Eric; Liou, Larry

    2010-01-01

    Since its inception in 2001, the objective of the In-Space Propulsion Technology (ISPT) project has been developing and delivering in-space propulsion technologies that enable or enhance NASA robotic science missions. These in-space propulsion technologies are applicable, and potentially enabling for future NASA flagship and sample return missions currently under consideration, as well as having broad applicability to future Discovery and New Frontiers mission solicitations. This paper provides status of the technology development, applicability, and availability of in-space propulsion technologies that recently completed, or will be completing within the next year, their technology development and are ready for infusion into missions. The paper also describes the ISPT project s future focus on propulsion for sample return missions. The ISPT technologies completing their development are: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance for lower cost; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) aerocapture technologies which include thermal protection system (TPS) materials and structures, guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and atmospheric and aerothermal effect models. The future technology development areas for ISPT are: 1) Planetary Ascent Vehicles (PAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) needed for sample return missions from many different destinations; 3) propulsion for Earth Return Vehicles (ERV) and transfer stages, and electric propulsion for sample return and low cost missions; 4) advanced propulsion technologies for sample return; and 5) Systems/Mission Analysis focused on sample return propulsion.

  14. 78 FR 78506 - Research and Development; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    .... PHMSA-2013-0261; Notice No. 13-21] Research and Development; Public Meeting AGENCY: Pipeline and... the Research and Development Forum to be held January 17, 2014, in Washington, DC. During this meeting, PHMSA will host the session to present the results of recently completed and current research projects...

  15. Gaining Ground: The Labor Market Progress of Sectoral Employment Development Programs. SEDLP Research Report.

    ERIC Educational Resources Information Center

    Zandniapour, Lily; Conway, Maureen

    The Sectoral Employment Development Learning Project conducted a longitudinal survey of participants of industry-based workforce development programs about two years after completing training. Outcomes for unemployed and underemployed workers--77 percent of the sample--indicated increased hours worked and increased earnings per hour produced…

  16. KSC-2009-6456

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates, Eric Silagy, Florida Power & Light Company vice president and chief development officer, for his part in the construction of NASA's first large-scale solar power generation facility as Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  17. KSC-2009-6455

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, for his part in the construction of NASA's first large-scale solar power generation facility as Eric Silagy, Florida Power & Light Company vice president and chief development officer, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  18. Oral and Maxillofacial Surgery Foundation Research and Fellowship Awards: A 26-Year Review at Massachusetts General Hospital and Harvard School of Dental Medicine.

    PubMed

    Inverso, Gino; Chuang, Sung-Kiang; Kaban, Leonard B

    2016-02-01

    The purpose of this study was to review outcomes of the Oral and Maxillofacial Surgery (OMS) Foundation's funding awards to members of the OMS department at Massachusetts General Hospital (MGH) in terms of projects completed, abstracts presented, peer-reviewed publications, and career trajectories of recipients. Data were collected from MGH and OMS Foundation records and interviews with award recipients. Primary outcome variables included 1) number of awards and award types, 2) funding amount, 3) project completion, 4) number of presented abstracts, 5) conversion from abstracts to publications, 6) number of peer-reviewed publications, 7) career trajectories of awardees, and 8) additional extramural funding. Eleven Student Research Training Awards provided $135,000 for 39 projects conducted by 37 students. Of these, 34 (87.2%) were completed. There were 30 student abstracts presented, 21 peer-reviewed publications, and a publication conversion rate of 58.8%. Faculty research awards comprised $1,510,970 for 22 research projects by 12 faculty members and two research fellows. Of the 22 funded projects, 21 (95.5%) were completed. There were 110 faculty and research fellow abstracts presented and 113 peer-reviewed publications, for a publication conversion rate of 93.8%. In the student group, 17 of 37 (45.9%) are enrolled in or are applying for OMS residencies. Of the 10 students who have completed OMS training, 3 (30%) are in full-time academic positions. Of the 12 faculty recipients, 9 (75%) remain in OMS academic practice. During this time period, the department received $9.9 million of extramural foundation or National Institutes of Health funding directly or indirectly related to the OMS Foundation grants. The results of this study indicate that 90.2% of projects funded by the OMS Foundation have been completed. Most projects resulted in abstracts and publications in peer-reviewed journals. These grants encouraged students to pursue OMS careers and aided OMS faculty in developing their research programs. Copyright © 2016 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  19. LESSONS LEARNED IN OPERATING THE HOSE-IN-HOSE SYSTEM FOR TRANSFSERRING SLUDGE AT HANFORDS K-BASINS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PERES MW

    In May 2007, the Department of Energy and the Fluor Hanford K Basin Closure Project completed transferring sludge from the K East Basin to new containers in the K West Basin using a Hose-in-Hose system. This project presented a number of complex and unique technical, operational, and management challenges that had to be resolved to complete the required transfers and satisfy project milestones. The project team (including DOE; regulators; and Fluor management, operations, maintenance, engineering and all other support organizations) found innovative solutions to each challenge. This paper records lessons learned during the operational phase of the sludge transfer viamore » the Hose-In-Hose system. The subject is limited to the operational phase and does not cover design, development, testing or turnover. A discussion of the situation or problem encountered is provided, along with the lesson learned as applicable to a future program or project.« less

  20. Output Control Technologies for a Large-scale PV System Considering Impacts on a Power Grid

    NASA Astrophysics Data System (ADS)

    Kuwayama, Akira

    The mega-solar demonstration project named “Verification of Grid Stabilization with Large-scale PV Power Generation systems” had been completed in March 2011 at Wakkanai, the northernmost city of Japan. The major objectives of this project were to evaluate adverse impacts of large-scale PV power generation systems connected to the power grid and develop output control technologies with integrated battery storage system. This paper describes the outline and results of this project. These results show the effectiveness of battery storage system and also proposed output control methods for a large-scale PV system to ensure stable operation of power grids. NEDO, New Energy and Industrial Technology Development Organization of Japan conducted this project and HEPCO, Hokkaido Electric Power Co., Inc managed the overall project.

  1. Development of Advanced Technologies for Complete Genomic and Proteomic Characterization of Quantized Human Tumor Cells

    DTIC Science & Technology

    2013-07-01

    AVAILABILITY STATEMENT Approved for Public Release; Distribution Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT With the establishment of GBM cell lines...and quantized cell populations form these GBM patients tumor samples we are able to complete some of our aims of our project. We will continue to...collect tumor samples with consent from families of GBM patients in preparation to perform the molecular analysis of these. Our efforts in the development

  2. RHOBOT: Radiation hardened robotics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennett, P.C.; Posey, L.D.

    1997-10-01

    A survey of robotic applications in radioactive environments has been conducted, and analysis of robotic system components and their response to the varying types and strengths of radiation has been completed. Two specific robotic systems for accident recovery and nuclear fuel movement have been analyzed in detail for radiation hardness. Finally, a general design approach for radiation-hardened robotics systems has been developed and is presented. This report completes this project which was funded under the Laboratory Directed Research and Development program.

  3. Improving the completion of Quality Improvement projects amongst psychiatry core trainees.

    PubMed

    Ewins, Liz

    2015-01-01

    Quality Improvement (QI) projects are seen increasingly as more valuable and effective in developing services than traditional audit. However, the development of this methodology has been slower in the mental health field and QI projects are new to most psychiatrists. This project describes a way of engaging trainees across Avon and Wiltshire Mental Health Partnership (AWP) Trust and the Severn School of Psychiatry in QI projects, using QI methodology itself. Through the implementation and development of training sessions and simple, low cost and sustainable interventions over a 10 month period, two thirds of core trainees and over a half of the advanced psychiatry trainees in the School are now participating in 28 individual QI projects and QI project methodology is to become embedded in the core psychiatry training course. As an additional positive outcome, specialty doctors, consultants, foundation doctors, GP trainees, medical students, as well as the wider multidisciplinary team, have all become engaged in QI projects alongside trainees, working with service users and their families to identify problems to tackle and ideas to test.

  4. The Use of Gap Analysis to Increase Student Completion Rates at Travelor Adult School

    ERIC Educational Resources Information Center

    Gil, Blanca Estela

    2013-01-01

    This project applied the gap analysis problem-solving framework (Clark & Estes, 2008) in order to help develop strategies to increase completion rates at Travelor Adult School. The purpose of the study was to identify whether the knowledge, motivation and organization barriers were contributing to the identified gap. A mixed method approached…

  5. The Genetics of Biofuel Traits in Panicum Grasses: Developing a Model System with Diploid Panicum Hallii

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Juenger, Thomas; Wolfrum, Ed

    Our DOE funded project focused on characterizing natural variation in C4 perennial grasses including switchgrass (Panicum virgatum) and Hall’s panicgrass (Panicum hallii). The main theme of our project was to better understand traits linked with plant performance and that impact the utility of plant biomass as a biofuel feedstock. In addition, our project developed tools and resources for studying genetic variation in Panicum hallii. Our project successfully screened both Panicum virgatum and Panicum hallii diverse natural collections for a host of phenotypes, developed genetic mapping populations for both species, completed genetic mapping for biofuel related traits, and helped in themore » development of genomic resources of Panicum hallii. Together, these studies have improved our understanding of the role of genetic and environmental factors in impacting plant performance. This information, along with new tools, will help foster the improvement of perennial grasses for feedstock applications.« less

  6. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  7. DEVELOPMENT AND IMPROVEMENT OF TEMPORAL ALLOCATION FACTOR FILES

    EPA Science Inventory

    The report gives results of a project to: (1) evaluate the quality and completeness of data and methods being used for temporal allocation of emissions data, (2) identify and prioritize needed improvements to current methods for developing temporal allocation factors (TAFs), and ...

  8. BIOWINOL TECHNOLOGIES: A HYBRID GREEN PROCESS FOR BIOFUEL PRODUCTION – PHASE 2

    EPA Science Inventory

    The development of hollow fiber membrane (HFM) reactor will result in improved gas utilization that will positively impact overall process efficiencies. Successful completion of this project could result in the development of many decentralized biofuel production systems near ...

  9. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less

  10. Biomass power for rural development: Phase 2. Technical progress report, April 1--June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    1998-11-01

    The project undertaken by the Salix Consortium is a multi-phased, multi-partner endeavor. Phase-1 focused on initial development and testing of the technology and agreements necessary to demonstrate commercial willow production in Phase-2. The Phase-1 objectives have been successfully completed: preparing final design plans for two utility pulverized coal boilers, developing fuel supply plans for the project, obtaining power production commitments from the power companies for Phase-2, obtaining construction and environmental permits, and developing an experimental strategy for crop production and power generation improvements needed to assure commercial success. The R and D effort also addresses environmental issues pertaining to introductionmore » of the willow energy system. Beyond those Phase-1 requirements the Consortium has already successfully demonstrated cofiring at Greenidge Station and developed the required nursery capacity for acreage scale-up. This past summer 105 acres were prepared in advance for the spring planting in 1998. Having completed the above tasks, the Consortium is well positioned to begin Phase-2. In phase-2 every aspect of willow production and power generation from willow will be demonstrated. The ultimate objective of Phase-2 is to transition the work performed under the Rural Energy for the Future project into a thriving, self-supported energy crop enterprise.« less

  11. Flat-plate solar array project: Experimental process system development unit for producing semiconductor-grade silicon using the silane-to-silicon process

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The engineering design, fabrication, assembly, operation, economic analysis, and process support research and development for an Experimental Process System Development Unit for producing semiconductor-grade silicon using the slane-to-silicon process are reported. The design activity was completed. About 95% of purchased equipment was received. The draft of the operations manual was about 50% complete and the design of the free-space system continued. The system using silicon power transfer, melting, and shotting on a psuedocontinuous basis was demonstrated.

  12. Reducing Risk for the Next Generation Nuclear Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John M. Beck II; Harold J. Heydt; Emmanuel O. Opare

    2010-07-01

    The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project.more » Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.« less

  13. Quality improvement "201": context-relevant quality improvement leadership training for the busy clinician-educator.

    PubMed

    Stille, Christopher J; Savageau, Judith A; McBride, Jeanne; Alper, Eric J

    2012-01-01

    Development of quality improvement (QI) skills and leadership for busy clinician-educators in academic medical centers is increasingly necessary, although it is challenging given limited resources. In response, the authors developed the Quality Scholars program for primary care teaching faculty. They conducted a needs assessment, evaluated existing internal and national resources, and developed a 9-month, 20-session project-based curriculum that combines didactic and hands-on techniques with facilitated project discussion. They also conducted pre-post tests of knowledge and attitudes, and evaluations of each session, scholars' projects, and program sustainability and costs. In all, 10 scholars from all 3 generalist disciplines comprised the first class. A wide spectrum of previous experiences enhanced collaboration. QI knowledge increased slightly, and reported self-readiness to lead QI projects increased markedly. Protected time for project work and group discussion of QI topics was seen as essential. All 10 scholars completed projects and presented results. Institutional leadership agreed to sustain the program using institutional funds.

  14. Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology Into Human Exploration and Operations Mission Directorate Projects at Glenn Research Center for 2015

    NASA Technical Reports Server (NTRS)

    Nguyen, Hung D.; Steele, Gynelle C.

    2016-01-01

    This report is intended to help NASA program and project managers incorporate Glenn Research Center Small Business Innovation Research/Small Business Technology Transfer (SBIR)/(STTR) technologies into NASA Human Exploration and Operations Mission Directorate (HEOMD) programs and projects. Other Government and commercial project managers can also find this useful. Introduction Incorporating Small Business Innovation Research (SBIR)-developed technology into NASA projects is important, especially given the Agency's limited resources for technology development. The SBIR program's original intention was for technologies that had completed Phase II to be ready for integration into NASA programs, however, in many cases there is a gap between Technology Readiness Levels (TRLs) 5 and 6 that needs to be closed. After SBIR Phase II projects are completed, the technology is evaluated against various parameters and a TRL rating is assigned. Most programs tend to adopt more mature technologies-at least TRL 6 to reduce the risk to the mission rather than adopt TRLs between 3 and 5 because those technologies are perceived as too risky. The gap between TRLs 5 and 6 is often called the "Valley of Death" (Figure 1), and historically it has been difficult to close because of a lack of funding support from programs. Several papers have already suggested remedies on how to close the gap (Refs. 1 to 4).

  15. The Palm Desert renewable [hydrogen] transportation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chamberlin, C.E.; Lehman, P.

    1998-08-01

    This paper describes the Schatz Energy Research Center (SERC) progress on the Palm Desert Renewable Hydrogen Transportation System Project for the period June 1997 through May 1998. The project began in March 1996. The goal of the Palm Desert Project is to develop a clean and sustainable transportation system for a community. The project demonstrates the practical utility of hydrogen as a transportation fuel and the proton exchange membrane (PEM) fuel cell as a vehicle power system. The project includes designing and building 4 fuel cell powered vehicles, a solar hydrogen generating and refueling station, and a fuel cell vehiclemore » diagnostic center. Over this last year, SERC has built a fuel cell powered neighborhood electric vehicle and delivered it to the City of Palm Desert. The design of the hydrogen refueling station is near completion and it is anticipated that construction will be complete in the fall of 1998. The vehicles are currently being refueled at a temporary refueling station. The diagnostic center is being designed and maintenance procedures as well as computer diagnostic programs for the fuel cell vehicles are being developed. City employees are driving the vehicles daily and monitoring data are being collected. The drivers are pleased with the performance of the vehicles.« less

  16. In situ treatment of VOCs by recirculation technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siegrist, R.L.; Webb, O.F.; Ally, M.R.

    1993-06-01

    The project described herein was conducted by Oak Ridge National Laboratory (ORNL) to identify processes and technologies developed in Germany that appeared to have near-term potential for enhancing the cleanup of volatile organic compound (VOC) contaminated soil and groundwater at DOE sites. Members of the ORNL research team identified and evaluated selected German technologies developed at or in association with the University of Karlsruhe (UoK) for in situ treatment of VOC contaminated soils and groundwater. Project activities included contacts with researchers within three departments of the UoK (i.e., Applied Geology, Hydromechanics, and Soil and Foundation Engineering) during fall 1991 andmore » subsequent visits to UoK and private industry collaborators during February 1992. Subsequent analyses consisted of engineering computations, groundwater flow modeling, and treatment process modeling. As a result of these project efforts, two processes were identified as having near-term potential for DOE: (1) the vacuum vaporizer well/groundwater recirculation well and (2) the porous pipe/horizontal well. This document was prepared to summarize the methods and results of the assessment activities completed during the initial year of the project. The project is still ongoing, so not all facets of the effort are completely described in this document. Recommendations for laboratory and field experiments are provided.« less

  17. Surface photovoltage measurements and finite element modeling of SAW devices.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donnelly, Christine

    2012-03-01

    Over the course of a Summer 2011 internship with the MEMS department of Sandia National Laboratories, work was completed on two major projects. The first and main project of the summer involved taking surface photovoltage measurements for silicon samples, and using these measurements to determine surface recombination velocities and minority carrier diffusion lengths of the materials. The SPV method was used to fill gaps in the knowledge of material parameters that had not been determined successfully by other characterization methods. The second project involved creating a 2D finite element model of a surface acoustic wave device. A basic form ofmore » the model with the expected impedance response curve was completed, and the model is ready to be further developed for analysis of MEMS photonic resonator devices.« less

  18. Olympic Fisher Reintroduction Project: Progress report 2008-2011

    USGS Publications Warehouse

    Jeffrey C. Lewis,; Patti J. Happe,; Jenkins, Kurt J.; Manson, David J.

    2012-01-01

    This progress report summarizes the final year of activities of Phase I of the Olympic fisher restoration project. The intent of the Olympic fisher reintroduction project is to reestablish a self-sustaining population of fishers on the Olympic Peninsula. To achieve this goal, the Olympic fisher reintroduction project released 90 fishers within Olympic National Park from 2008 to 2010. The reintroduction of fishers to the Olympic Peninsula was designed as an adaptive management project, including the monitoring of released fishers as a means to (1) evaluate reintroduction success, (2) investigate key biological and ecological traits of fishers, and (3) inform future reintroduction, monitoring, and research efforts. This report summarizes reintroduction activities and preliminary research and monitoring results completed through December 2011. The report is non-interpretational in nature. Although we report the status of movement, survival, and home range components of the research, we have not completed final analyses and interpretation of research results. Much of the data collected during the monitoring and research project will be analyzed and interpreted in the doctoral dissertation being developed by Jeff Lewis; the completion of this dissertation is anticipated prior to April 2013. We anticipate that this work, and analyses of other data collected during the project, will result in several peer-reviewed scientific publications in ecological and conservation journals, which collectively will comprise the final reporting of work summarized here. These publications will include papers addressing post-release movements, survival, resource selection, food habits, and age determination of fishers.

  19. IDEAS and App Development Internship in Hardware and Software Design

    NASA Technical Reports Server (NTRS)

    Alrayes, Rabab D.

    2016-01-01

    In this report, I will discuss the tasks and projects I have completed while working as an electrical engineering intern during the spring semester of 2016 at NASA Kennedy Space Center. In the field of software development, I completed tasks for the G-O Caching Mobile App and the Asbestos Management Information System (AMIS) Web App. The G-O Caching Mobile App was written in HTML, CSS, and JavaScript on the Cordova framework, while the AMIS Web App is written in HTML, CSS, JavaScript, and C# on the AngularJS framework. My goals and objectives on these two projects were to produce an app with an eye-catching and intuitive User Interface (UI), which will attract more employees to participate; to produce a fully-tested, fully functional app which supports workforce engagement and exploration; to produce a fully-tested, fully functional web app that assists technicians working in asbestos management. I also worked in hardware development on the Integrated Display and Environmental Awareness System (IDEAS) wearable technology project. My tasks on this project were focused in PCB design and camera integration. My goals and objectives for this project were to successfully integrate fully functioning custom hardware extenders on the wearable technology headset to minimize the size of hardware on the smart glasses headset for maximum user comfort; to successfully integrate fully functioning camera onto the headset. By the end of this semester, I was able to successfully develop four extender boards to minimize hardware on the headset, and assisted in integrating a fully-functioning camera into the system.

  20. Ceramic technology for advanced heat engines project. Semiannual progress report, April-September 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-05-01

    An assessment of needs was completed, and a five-year project plan was developed with input from private industry. Objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. Focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. The work described in this report is organized according to the following WBS project elements: management and coordination; materials and processing (monolithics, ceramic composites, thermal and wear coatings, joining); materials design methodology (contact interfaces, newmore » concepts); data base and life prediction (time-dependent behavior, environmental effects, fracture mechanics, NDE development); and technology transfer. This report includes contributions from all currently active project participants.« less

  1. The CP-PACS project

    NASA Astrophysics Data System (ADS)

    Iwasaki, Y.; CP-PACS Collaboration

    1998-01-01

    The CP-PACS project is a five year plan, which formally started in April 1992 and has been completed in March 1997, to develop a massively parallel computer for carrying out research in computational physics with primary emphasis on lattice QCD. The initial version of the CP-PACS computer with a theoretical peak speed of 307 GFLOPS with 1024 processors was completed in March 1996. The final version with a peak speed of 614 GFLOPS with 2048 processors was completed in September 1996, and has been in full operation since October 1996. We describe the architecture, the final specification, the hardware implementation, and the software of the CP-PACS computer. The CP-PACS has been used for hadron spectroscopy production runs since July 1996. The performance for lattice QCD applications and the LINPACK benchmark are given.

  2. SAGA: A project to automate the management of software production systems

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.; Badger, W.; Beckman, C. S.; Beshers, G.; Hammerslag, D.; Kimball, J.; Kirslis, P. A.; Render, H.; Richards, P.; Terwilliger, R.

    1984-01-01

    The project to automate the management of software production systems is described. The SAGA system is a software environment that is designed to support most of the software development activities that occur in a software lifecycle. The system can be configured to support specific software development applications using given programming languages, tools, and methodologies. Meta-tools are provided to ease configuration. Several major components of the SAGA system are completed to prototype form. The construction methods are described.

  3. Advanced Monobore Concept, Development of CFEX Self-Expanding Tubular Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeff Spray

    2007-09-30

    The Advanced Monobore Concept--CFEX{copyright} Self-Expanding Tubular Technology Development was a successfully executed fundamental research through field demonstration project. This final report is presented as a progression, according to basic technology development steps. For this project, the research and development steps used were: concept development, engineering analysis, manufacturing, testing, demonstration, and technology transfer. The CFEX{copyright} Technology Development--Advanced Monobore Concept Project successfully completed all of the steps for technology development, covering fundamental research, conceptual development, engineering design, advanced-level prototype construction, mechanical testing, and downhole demonstration. Within an approximately two year period, a partially defined, broad concept was evolved into a substantial newmore » technological area for drilling and production engineering applicable a variety of extractive industries--which was also successfully demonstrated in a test well. The demonstration achievement included an actual mono-diameter placement of two self-expanding tubulars. The fundamental result is that an economical and technically proficient means of casing any size of drilling or production well or borehole is indicated as feasible based on the results of the project. Highlighted major accomplishments during the project's Concept, Engineering, Manufacturing, Demonstration, and Technology Transfer phases, are given.« less

  4. Advanced Manufacturing for Thermal and Environmental Control Systems: Achieving National Energy Goals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bogucz, Edward A.

    This project was part of a regional initiative in the five counties of Central New York (CNY) that received funding from the U.S. Department of Energy (DOE) and four other federal agencies through the 2012 Advanced Manufacturing Jobs and Innovation Accelerator Challenge (AMJIAC). The CNY initiative was focused on cultivating the emergent regional cluster in “Advanced Manufacturing for Thermal and Environmental Control (AM-TEC).” As one component of the CNY AM-TEC initiative, the DOE-funded project supported five research & development seed projects that strategically targeted: 1) needs and opportunities of CNY AM-TEC companies, and 2) the goal of DOE’s Advanced Manufacturingmore » Office (AMO) to reduce energy consumption by 50% across product life-cycles over 10 years. The project also sought to fulfill the AMO mission of developing and demonstrating new, energy-efficient processing and materials technologies at a scale adequate to prove their value to manufacturers and spur investment. The five seed projects demonstrated technologies and processes that can reduce energy intensity and improve production as well as use less energy throughout their lifecycles. The project was conducted over three years in two 18-month budget periods. During the first budget period, two projects proposed in the original AMJAIC application were successfully completed: Seed Project 1 focused on saving energy in heat transfer processes via development of nano structured surfaces to significantly increase heat flux; Seed Project 2 addressed saving energy in data centers via subzero cooling of the computing processors. Also during the first budget period, a process was developed and executed to select a second round of seed projects via a competitive request for proposals from regional companies and university collaborators. Applicants were encouraged to form industry-academic partnerships to leverage experience and resources of public and private sectors in the CNY region. Proposals were evaluated by a national panel of experts. Three projects were selected for awards and were completed successfully during the second budget period: Seed Project 3 focused on enabling self-powered furnaces to permit residents to shelter in place during power outages; Seed Project 4 addressed development of a novel method of controlling air conditioning systems that could enable flexible load matching in market segments not possible with existing technologies; and Seed Project 5 focused on the creation of smarter occupancy sensors to enable effective highly localized demand based ventilation.« less

  5. Teacher Collaborative Inquiry as a Professional Development Intervention: Benefits and Challenges

    ERIC Educational Resources Information Center

    Deni, Ann Rosnida Md.; Malakolunthu, Suseela

    2013-01-01

    The paper reports on a collaborative learning project coded as the teacher inquiry community that was carried out over a year in a private higher education institution to improve the professional capability of language-based subject teachers. Nine teachers completed the project all of whom were females and shared work experience of 2-29 years. Six…

  6. Including a Service Learning Educational Research Project in a Biology Course-I: Assessing Community Awareness of Childhood Lead Poisoning

    ERIC Educational Resources Information Center

    Abu-Shakra, Amal; Saliim, Eric

    2012-01-01

    A university course project was developed and implemented in a biology course, focusing on environmental problems, to assess community awareness of childhood lead poisoning. A set of 385 questionnaires was generated and distributed in an urban community in North Carolina, USA. The completed questionnaires were sorted first into yes and no sets…

  7. Teenage Parent Center of the Single Parent Assistance, Counseling and Education Project. Annual Report FY 86-87.

    ERIC Educational Resources Information Center

    Middlesex County Vocational and Technical High Schools, New Brunswick, NJ.

    The Teenage Parent Center of the Single Parent Assistance, Counseling and Education Project was developed to support, guide, and direct adolescent mothers, pregnant teenagers, and teens at risk of becoming parents through successful completion of a high school diploma or school year in a vocational setting in Middlesex County, New Jersey. The…

  8. Including a Service Learning Educational Research Project in a Biology Course-II: Assessing Community Awareness of Legionnaires' Disease?

    ERIC Educational Resources Information Center

    Abu-Shakra, Amal

    2012-01-01

    For a university service learning educational research project addressing Legionnaires' disease (LD), a Yes/No questionnaire on community awareness of LD was developed and distributed in an urban community in North Carolina, USA. The 456 questionnaires completed by the participants were sorted into yes and no sets based on responses obtained to…

  9. Social and Personal Factors in Semantic Infusion Projects

    NASA Astrophysics Data System (ADS)

    West, P.; Fox, P. A.; McGuinness, D. L.

    2009-12-01

    As part of our semantic data framework activities across multiple, diverse disciplines we required the involvement of domain scientists, computer scientists, software engineers, data managers, and often, social scientists. This involvement from a cross-section of disciplines turns out to be a social exercise as much as it is a technical and methodical activity. Each member of the team is used to different modes of working, expectations, vocabularies, levels of participation, and incentive and reward systems. We will examine how both roles and personal responsibilities play in the development of semantic infusion projects, and how an iterative development cycle can contribute to the successful completion of such a project.

  10. Waste picker livelihoods and inclusive neoliberal municipal solid waste management policies: The case of the La Chureca garbage dump site in Managua, Nicaragua.

    PubMed

    Hartmann, Chris

    2018-01-01

    The modernization (i.e. mechanization, formalization, and capital intensification) and enclosure of municipal solid waste management (MSWM) systems threaten waste picker livelihoods. From 2009 to 2013, a major development project, embodying traditional neoliberal policies with inclusive social policies, transformed the Managua, Nicaragua, municipal solid waste site from an open-air dump where as many as 2,000 informal waste pickers toiled to a sanitary landfill. To investigate waste pickers' social and economic condition, including labor characteristics, household income, and poverty incidence, after the project's completion, 146 semi-structured survey questionnaires were administered to four communities adjacent to the landfill and 45 semi-structured interviews were completed with key stakeholders. Findings indicate that hundreds of waste pickers were displaced by the project, employment benefits from the project were unevenly distributed by neighborhood, and informal waste picking endures due to persistent impoverishment, thereby contributing to continued social and economic marginalization and environmental degradation. The findings highlight the limitations of inclusive neoliberal development efforts to transform MSWM in a low-income country. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. Fate of protocols submitted to a French national funding scheme: a cohort study.

    PubMed

    Decullier, Evelyne; Huot, Laure; Chapuis, François R

    2014-01-01

    The fate of clinical research projects funded by a grant has been investigated, but there is no information on the projects which did not receive funding. The fate of these projects is not known: do they apply for and/or receive funding from other sources or are they carried out without specific funding? The aim of the study was to describe all clinical research projects submitted to a French national funding scheme (PHRC 2000) and to assess project initiation, completion and publication status taking into account whether or not they received funding. This study is a retrospective cohort. The initial project characteristics were retrieved from the submission files and follow-up information was collected from the primary investigator. The percentages of projects started, completed and published were studied. A total of 481 projects were studied. Follow-up information was obtained for 366. Overall, 185 projects were initiated (51%); 139 of them were funded by the PHRC 2000 or other sources. The most commonly cited reason for not initiating a project was a lack of funding. Subsequently, 121 of the projects initiated were completed (65%). Accrual difficulties were the main reason cited to explain why studies were stopped prematurely or were still ongoing. Finally, 88 of the completed projects were published (73%). Amongst the completed projects, the only factor explaining publication was the statistical significance of the results. Obtainment of funding was a determining factor for project initiation. However, once initiated, the funding did not influence completion or publication.

  12. Process Parameter Evaluation and Optimization for Advanced Material Development Final Report CRADA No. TC-1234-96

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hrubesh, L.; McGann, T. W.

    This project was established as a three-year collaboration to produce and characterize · silica aerogels prepared by a Rapid Supercritical Extraction (RSCE) process to meet . BNA, Inc. application requirements. The objectives of this project were to study the parameters necessary to produce optimized aerogel parts with narrowly specified properties and establish the range and limits of the process for producing such aerogels. The project also included development of new aerogel materials useful for high temperature applications. The results of the project were expected to set the conditions necessary to produce quantities of aerogels having particular specifications such as size,more » shape, density, and mechanical strength. BNA, Inc. terminated the project on April 7, 1999, 10-months prior to the anticipated completion date, due to termination of corporate funding for the project. The technical accomplishments achieved are outlined in Paragraph C below.« less

  13. Manpower Research and Development for Counselors. R and D Bibliography No. 1.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. Office of Research and Development.

    The 10-page bibliography is a selective list of reports completed under contracts and grants from the Manpower Administration, Office of Research and Development. The reports are based on comprehensive and innovative research and development projects and are listed under the following headings: (1) Use and training of paraprofessionals; (2)…

  14. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanford, P.C.; Moe, M.A.; Hombach, W.G.

    2013-07-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reportingmore » tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)« less

  15. A Framework for Lab Work Management in Mass Courses. Application to Low Level Input/Output without Hardware

    ERIC Educational Resources Information Center

    Rodriguez, Santiago; Zamorano, Juan; Rosales, Francisco; Dopico, Antonio Garcia; Pedraza, Jose Luis

    2007-01-01

    This paper describes a complete lab work management framework designed and developed in the authors' department to help teachers to manage the small projects that students are expected to complete as lab assignments during their graduate-level computer engineering studies. The paper focuses on an application example of the framework to a specific…

  16. Teaching Sustainable Water Resources and Low Impact Development: A Project Centered Course for First-Year Undergraduates

    NASA Astrophysics Data System (ADS)

    Cianfrani, C. M.

    2009-12-01

    Teaching Sustainable Water Resources and Low Impact Development: A Project Centered Course for First-Year Undergraduates Christina M. Cianfrani Assistant Professor, School of Natural Science, Hampshire College, 893 West Avenue, Amherst, MA 01002 Sustainable water resources and low impact development principles are taught to first-year undergraduate students using an applied design project sited on campus. All students at Hampshire College are required to take at least one natural science course during their first year as part of their liberal arts education. This requirement is often met with resistance from non-science students. However, ‘sustainability’ has shown to be a popular topic on campus and ‘Sustainable Water Resources’ typically attracts ~25 students (a large class size for Hampshire College). Five second- or third-year students are accepted in the class as advanced students and serve as project leaders. The first-year students often enter the class with only basic high school science background. The class begins with an introduction to global water resources issues to provide a broad perspective. The students then analyze water budgets, both on a watershed basis and a personal daily-use basis. The students form groups of 4 to complete their semester project. Lectures on low impact design principles are combined with group work sessions for the second half of the semester. Students tour the physical site located across the street from campus and begin their project with a site analysis including soils, landcover and topography. They then develop a building plan and identify preventative and mitigative measures for dealing with stormwater. Each group completes TR-55 stormwater calculations for their design (pre- and post-development) to show the state regulations for quantity will be met with their design. Finally, they present their projects to the class and prepare a formal written report. The students have produced a wide variety of creative, mostly practical designs. Student feedback about the course has included high praise for the applied nature of the project as well as the use of advanced students to lead the groups and help provide guidance throughout the project. Example of low impact development using clustered housing, rain gardens (small dots), green roofs (circles on house sites), vegetated swales along roadways, infiltration area, and a reforested buffer (along right edge).

  17. X-ray satellite

    NASA Technical Reports Server (NTRS)

    1985-01-01

    An overview of the second quarter 1985 development of the X-ray satellite project is presented. It is shown that the project is proceeding according to plan and that the projected launch date of September 9, 1987 is on schedule. An overview of the work completed and underway on the systems, subsystems, payload, assembly, ground equipment and interfaces is presented. Problem areas shown include cost increases in the area of focal instrumentation, the star sensor light scattering requirements, and postponements in the data transmission subsystems.

  18. Projects in an expert system class

    NASA Technical Reports Server (NTRS)

    Whitson, George M.

    1991-01-01

    Many universities now teach courses in expert systems. In these courses students study the architecture of an expert system, knowledge acquisition techniques, methods of implementing systems and verification and validation techniques. A major component of any such course is a class project consisting of the design and implementation of an expert system. Discussed here are a number of techniques that we have used at the University of Texas at Tyler to develop meaningful projects that could be completed in a semester course.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Aaron; Reece, Blake D.; Berger, Jason E.

    This report contains a summary of the work completed to develop a modular, rotational exercise device. In the report are images, diagrams, and explanations of the efforts contributed to the project since its inception. The purpose of this document is to provide a walk-through of the progress on this project, from the initial design concepts to the final design and work done, so that the customer (Twist Resist), or individuals/firms who work on this project in the future will have a springboard of ideas/concepts to work from.

  20. Project-based physics labs using low-cost open-source hardware

    NASA Astrophysics Data System (ADS)

    Bouquet, F.; Bobroff, J.; Fuchs-Gallezot, M.; Maurines, L.

    2017-03-01

    We describe a project-based physics lab, which we proposed to third-year university students. These labs are based on new open-source low-cost equipment (Arduino microcontrollers and compatible sensors). Students are given complete autonomy: they develop their own experimental setup and study the physics topic of their choice. The goal of these projects is to let students to discover the reality of experimental physics. Technical specifications of the acquisition material and case studies are presented for practical implementation in other universities.

  1. Developing Career and Employability Skills: A US Case Study.

    ERIC Educational Resources Information Center

    Zinser, Richard

    2003-01-01

    Western Michigan University's technical teacher education program developed a course on teaching career and employability skills using state standards and benchmarks as a framework. Preservice teachers complete five projects: job shadowing, professional portfolio, written lesson plan, videotape and self-critique of lesson plan, and an application…

  2. Idea Project Final Report, Development Of An Intelligent Air Brake Warning System For Commercial Vehicles

    DOT National Transportation Integrated Search

    1996-05-31

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULT FOR THE DEVELOP...

  3. Maternal and Child Health Research Program. Completed Projects 1989, 1990, and 1991.

    ERIC Educational Resources Information Center

    National Center for Education in Maternal and Child Health, Arlington, VA.

    This publication describes 33 research projects supported by the federal Maternal and Child Health Bureau and completed in 1989, 1990, and 1991. It is the third edition in a series of collected abstracts of completed maternal and child health research projects. Each project abstract contains the name of the grantee, name and address of the…

  4. Immunization coverage in India for areas served by the Integrated Child Development Services programme. The Integrated Child Development Services Consultants.

    PubMed

    Tandon, B N; Gandhi, N

    1992-01-01

    The Integrated Child Development Services (ICDS) programme was launched by the Indian government in October 1975 to provide a package of health, nutrition and informal educational services to mothers and children. In 1988 we studied the impact of ICDS on the immunization coverage of children aged 12-24 months and of mothers of infants in 19 rural, 8 tribal, and 9 urban ICDS projects that had been operational for more than 5 years. Complete coverage with BCG, diphtheria-pertussis-tetanus (DPT) and poliomyelitis vaccines was recorded for 65%, 63%, and 64% of children, respectively, in the ICDS population. By comparison, the coverage in the non-ICDS group was only 22% for BCG, 28% for DPT, and 27% for poliomyelitis. Complete immunization with tetanus toxoid was recorded for 68% of the mothers in the ICDS group and for 40% in the non-ICDS group. Coverage was greater in the urban and lower in the tribal projects. Scheduled castes, scheduled tribes, backward communities, and minorities (groups that have a high priority for social services) had immunization coverages in ICDS projects that were similar to those of higher castes.

  5. 30 CFR 250.292 - What must the DWOP contain?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... description and schematic of the typical wellbore, casing, and completion; (b) Structural design, fabrication... systems that constitute all or part of a single project development covered by the DWOP; (j) Flow...

  6. Tracing Impacts of Science and Technology Development

    NASA Astrophysics Data System (ADS)

    Powell, Jeanne

    2003-03-01

    ATP's Mission and Operations. The ATP partners with industry to accelerate the development of innovative technologies for broad national economic benefit. The program's focus is on co-funding collaborative, multi-disciplinary technologies and enabling technology platforms that appear likely to be commercialized, with private sector funding, once the high technical risks are reduced. Industry-led projects are selected for funding in rigorous competitions on the basis of technical and economic merit. Since 1990, ATP has co-funded 642 projects, with 1,329 participants and another 1,300 subcontractors. Measuring to Mission: Overview of ATP's Evaluation Program. ATP's multi-component evaluation strategy provides measures of progress and performance matched to the stage of project evolution; i.e., for the short-term, from the time of project selection and over the course of the R for the mid-term, as commercial applications are pursued, early products reach the market, and dissemination of knowledge created in the R projects occurs; and for the longer-term, as more fully-developed technologies diffuse across multiple products and industries. The approach is applicable to all public S programs and adaptable to private or university projects ranging from basic research to applied industrial R. Examples of Results. ATP's composite performance rating system assesses ATP's completed projects against multi-faceted performance criteria of Knowledge Creation and Dissemination and Commercialization Progress 2-3 years after the end of ATP-funded R. It generates scores ranging from zero to four stars. Results for ATP's first 50 completed projects show that 16are in the bottom group of zero or one stars. 60the middle group. It is understood that not all ATP projects will be successful given the program's emphasis on funding high-risk technology development that the private sector is unwilling and unable to fund alone. Different technologies have different timelines for commercialization and diffusion. ATP has contracted a number of in-depth case studies of individual projects and groups of related projects. Given that the full timeline for economic impact extends many years after ATP funding ends, some studies are prospective, and others are retrospective. Some are a mix of the two. Quantitative economic impacts from just a few or the projects funded to date provide strong evidence that the ATP is addressing its ultimate goal of broad economic benefits to the nation and generating value that vastly exceeds the cost of the program to date.

  7. ART/Ada and CLIPS/Ada

    NASA Technical Reports Server (NTRS)

    Culbert, Chris

    1990-01-01

    Although they have reached a point of commercial viability, expert systems were originally developed in artificial intelligence (AI) research environments. Many of the available tools still work best in such environments. These environments typically utilize special hardware such as LISP machines and relatively unfamiliar languages such as LISP or Prolog. Space Station applications will require deep integration of expert system technology with applications developed in conventional languages, specifically Ada. The ability to apply automation to Space Station functions could be greatly enhanced by widespread availability of state-of-the-art expert system tools based on Ada. Although there have been some efforts to examine the use of Ada for AI applications, there are few, if any, existing products which provide state-of-the-art AI capabilities in an Ada tool. The goal of the ART/Ada Design Project is to conduct research into the implementation in Ada of state-of-the-art hybrid expert systems building tools (ESBT's). This project takes the following approach: using the existing design of the ART-IM ESBT as a starting point, analyze the impact of the Ada language and Ada development methodologies on that design; redesign the system in Ada; and analyze its performance. The research project will attempt to achieve a comprehensive understanding of the potential for embedding expert systems in Ada systems for eventual application in future Space Station Freedom projects. During Phase 1 of the project, initial requirements analysis, design, and implementation of the kernel subset of ART-IM functionality was completed. During Phase 2, the effort has been focused on the implementation and performance analysis of several versions with increasing functionality. Since production quality ART/Ada tools will not be available for a considerable time, and additional subtask of this project will be the completion of an Ada version of the CLIPS expert system shell developed by NASA. This tool will provide full syntactic compatibility with any eventual products of the ART/Ada design while allowing SSFP developers early access to this technology.

  8. An innovative partnership in service.

    PubMed

    Lazarus, Cathy J; Krane, N Kevin; Bowdish, Bruce

    2002-07-01

    Stimulated by the need for better alignment of educational content and goals with evolving societal needs, practice patterns, and scientific developments, many medical schools are implementing new and creative educational experiences for students. Tulane University School of Medicine and Apple Computers have established an innovative partnership in which Apple laptop computers support and enhance students' service learning projects. The partnership also provides a unique opportunity to meet the Medical School Objectives Project (MSOP) objectives in Medical Informatics and Population Health, as outlined in Report II.(1) Apple Computers has a commitment to the New Orleans community as part of its corporate strategic plan to support educational programs at all levels; Tulane has a longstanding commitment to and experience with student-led service learning as part of the Foundations in Medicine Course.(2) Senior administrative personnel from Tulane and Apple discussed these common interests, resulting in a partnership to enhance the potential impact on the community served. Apple agreed to donate 20 G3 Powerbooks and a complete set of the Apple Learning series of software to support new and ongoing service-learning projects. A committee of Tulane faculty and students, information technology staff, and an Apple representative developed the project. To maximize students' access to the laptops while managing the administration's liability, the laptops were identically configured with standardized software packages (database development and maintenance, Web access, word processing, presentation development and execution, automated backup, and individual project access to protected server space). To maximize the use of the laptops, students from the service-learning organizations can check out the laptops on a just-in-time basis, because the projects have different needs over time. Student-service leaders are currently defining and developing the exact uses for the laptops. We anticipate that this project will enhance the administrative management of service-learning programs (e.g., schedules, directions to sites), the presentation of educational programs (e.g., teaching in schools), the creation of new media to support programs (e.g., our restaurant choking program has a partnership with the American Heart Association to create a video and training manual to be used nationwide), and data tracking (e.g., sites and clients served, outcomes achieved). Students' use of the laptops should support the achievement of several of the MSOP Report II Medical Informatics objectives. To assess that, all first-year medical students are completing a pre- and post-project survey based on those objectives. The availability of laptops and software should significantly enhance the service-learning programs. The students participating should gain important skills in the use of computer technology related to their roles as lifelong learners, educators and communicators, researchers, and managers.(1) We plan to report the results of the pre- and post-project surveys once they have been completed. Students' feedback on the project has been very positive, and we hope it can serve as a model for other medical school, corporate, and community partnerships.

  9. Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steve McRae; Thomas Walsh; Michael Dunn

    2010-02-22

    In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrowmore » Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.« less

  10. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    PubMed

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  11. Report for Task 8.4: Development of Control Room Layout Recommendations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, Robert

    Idaho National Laboratory (INL) has contracted Institutt for Energiteknikk (IFE) to support in the development of an end state vision for the US Nuclear industry and in particular for a utility that is currently moving forward with a control room modernization project. This support includes the development of an Overview display and technical support in conducting an operational study. Development of operational scenarios to be conducted using a full scope simulator at the INL HSSL. Additionally IFE will use the CREATE modelling tool to provide 3-D views of the potential and possible end state view after the completion of digitalmore » upgrade project.« less

  12. Project Scheduling Based on Risk of Gas Transmission Pipe

    NASA Astrophysics Data System (ADS)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  13. High Penetration Solar PV Deployment Sunshine State Solar Grid Initiative (SUNGRIN)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meeker, Rick; Steurer, Mischa; Faruque, MD Omar

    The report provides results from the Sunshine State Solar Grid Initiative (SUNGRIN) high penetration solar PV deployment project led by Florida State University’s (FSU) Center for Advanced Power Systems (CAPS). FSU CAPS and industry and university partners have completed a five-year effort aimed at enabling effective integration of high penetration levels of grid-connected solar PV generation. SUNGRIN has made significant contributions in the development of simulation-assisted techniques, tools, insight and understanding associated with solar PV effects on electric power system (EPS) operation and the evaluation of mitigation options for maintaining reliable operation. An important element of the project was themore » partnership and participation of six major Florida utilities and the Florida Reliability Coordinating Council (FRCC). Utilities provided details and data associated with actual distribution circuits having high-penetration PV to use as case studies. The project also conducted foundational work supporting future investigations of effects at the transmission / bulk power system level. In the final phase of the project, four open-use models with built-in case studies were developed and released, along with synthetic solar PV data sets, and tools and techniques for model reduction and in-depth parametric studies of solar PV impact on distribution circuits. Along with models and data, at least 70 supporting MATLAB functions have been developed and made available, with complete documentation.« less

  14. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  15. A Matlab toolkit for three-dimensional electrical impedance tomography: a contribution to the Electrical Impedance and Diffuse Optical Reconstruction Software project

    NASA Astrophysics Data System (ADS)

    Polydorides, Nick; Lionheart, William R. B.

    2002-12-01

    The objective of the Electrical Impedance and Diffuse Optical Reconstruction Software project is to develop freely available software that can be used to reconstruct electrical or optical material properties from boundary measurements. Nonlinear and ill posed problems such as electrical impedance and optical tomography are typically approached using a finite element model for the forward calculations and a regularized nonlinear solver for obtaining a unique and stable inverse solution. Most of the commercially available finite element programs are unsuitable for solving these problems because of their conventional inefficient way of calculating the Jacobian, and their lack of accurate electrode modelling. A complete package for the two-dimensional EIT problem was officially released by Vauhkonen et al at the second half of 2000. However most industrial and medical electrical imaging problems are fundamentally three-dimensional. To assist the development we have developed and released a free toolkit of Matlab routines which can be employed to solve the forward and inverse EIT problems in three dimensions based on the complete electrode model along with some basic visualization utilities, in the hope that it will stimulate further development. We also include a derivation of the formula for the Jacobian (or sensitivity) matrix based on the complete electrode model.

  16. Waste management CDM projects barriers NVivo 10® qualitative dataset.

    PubMed

    Bufoni, André Luiz; de Sousa Ferreira, Aracéli Cristina; Oliveira, Luciano Basto

    2017-12-01

    This article contains one NVivo 10® file with the complete 432 projects design documents (PDD) of seven waste management sector industries registered as Clean Development Mechanism (CDM) under United Nations Framework Convention on Climate Change (UNFCCC) Kyoto Protocol Initiative from 2004 to 2014. All data analyses and sample statistics made during the research remain in the file. We coded PDDs in 890 fragments of text, classified in five categories of barriers (nodes): technological, financial, human resources, regulatory, socio-political. The data supports the findings of author thesis [1] and other two indexed publication in Waste Management Journal: "The financial attractiveness assessment of large waste management projects registered as clean development mechanism" and "The declared barriers of the large developing countries waste management projects: The STAR model" [2], [3]. The data allows any computer assisted qualitative content analysis (CAQCA) on the sector and it is available at Mendeley [4].

  17. The application of remote sensing to resource management and environmental quality programs in Kansas

    NASA Technical Reports Server (NTRS)

    Barr, B. G.; Martinko, E. A.

    1976-01-01

    Activities of the Kansas Applied Remote Sensing Program (KARS) designed to establish interactions on cooperative projects with decision makers in Kansas agencies in the development and application of remote sensing procedures are reported. Cooperative demonstration projects undertaken with several different agencies involved three principal areas of effort: Wildlife Habitat and Environmental Analysis; Urban and Regional Analysis; Agricultural and Rural Analysis. These projects were designed to concentrate remote sensing concepts and methodologies on existing agency problems to insure the continued relevancy of the program and maximize the possibility for immediate operational use. Completed projects are briefly discussed.

  18. Surgery and Research: A Practical Approach to Managing the Research Process

    PubMed Central

    Swiatek, Peter R.; Chung, Kevin C.; Mahmoudi, Elham

    2016-01-01

    Following a practical project management method is essential in completing a research project on time and within budget. Although this concept is well developed in the business world, it has yet to be explored in academic surgical research. Defining and adhering to a suitable workflow would increase portability, reusability, and therefore, efficiency of the research process. In this article, we briefly review project management techniques. We specifically underline four main steps of project management: (1) definition and organization, (2) planning, (3) execution, and (4) evaluation, using practical examples from our own multidisciplinary plastic surgery research team. PMID:26710037

  19. ENHANCED PRACTICAL PHOTOSYNTHETIC CO2 MITIGATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dr. Gregory Kremer; Dr. David J. Bayless; Dr. Morgan Vis

    2001-07-25

    This quarterly report documents significant achievements in the Enhanced Practical Photosynthetic CO{sub 2} Mitigation project during the period from 4/03/2001 through 7/02/2001. Most of the achievements are milestones in our efforts to complete the tasks and subtasks that constitute the project objectives. Note that this version of the quarterly technical report is a revision to add the reports from subcontractors Montana State and Oak Ridge National Laboratories The significant accomplishments for this quarter include: Development of an experimental plan and initiation of experiments to create a calibration curve that correlates algal chlorophyll levels with carbon levels (to simplify future experimentalmore » procedures); Completion of debugging of the slug flow reactor system, and development of a plan for testing the pressure drop of the slug flow reactor; Design and development of a new bioreactor screen design which integrates the nutrient delivery drip system and the harvesting system; Development of an experimental setup for testing the new integrated drip system/harvesting system; Completion of model-scale bioreactor tests examining the effects of CO{sub 2} concentration levels and lighting levels on Nostoc 86-3 growth rates; Completion of the construction of a larger model-scale bioreactor to improve and expand testing capabilities and initiation of tests; Substantial progress on construction of a pilot-scale bioreactor; and Preliminary economic analysis of photobioreactor deployment. Plans for next quarter's work are included in the conclusions. A preliminary economic analysis is included as an appendix.« less

  20. A Novel Approach to Practice-Based Learning and Improvement Using a Web-Based Audit and Feedback Module.

    PubMed

    Boggan, Joel C; Cheely, George; Shah, Bimal R; Heffelfinger, Randy; Springall, Deanna; Thomas, Samantha M; Zaas, Aimee; Bae, Jonathan

    2014-09-01

    Systematically engaging residents in large programs in quality improvement (QI) is challenging. To coordinate a shared QI project in a large residency program using an online tool. A web-based QI tool guided residents through a 2-phase evaluation of performance of foot examinations in patients with diabetes. In phase 1, residents completed reviews of health records with online data entry. Residents were then presented with personal performance data relative to peers and were prompted to develop improvement plans. In phase 2, residents again reviewed personal performance. Rates of performance were compared at the program and clinic levels for each phase, with data presented for residents. Acceptability was measured by the number of residents completing each phase. Feasibility was measured by estimated faculty, programmer, and administrator time and costs. Seventy-nine of 86 eligible residents (92%) completed improvement plans and reviewed 1471 patients in phase 1, whereas 68 residents (79%) reviewed 1054 patient charts in phase 2. Rates of performance of examination increased significantly between phases (from 52% to 73% for complete examination, P < .001). Development of the tool required 130 hours of programmer time. Project analysis and management required 6 hours of administrator and faculty time monthly. An online tool developed and implemented for program-wide QI initiatives successfully engaged residents to participate in QI activities. Residents using this tool demonstrated improvement in a selected quality target. This tool could be adapted by other graduate medical education programs or for faculty development.

  1. THE PRE-TECHNICAL PROJECT, A DEMONSTRATION IN EDUCATION FOR TECHNOLOGY. MEDICAL TECHNOLOGY, 11TH AND 12TH YEAR.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY.

    MEDICAL TECHNOLOGY IS ONE OF THREE OFFERINGS OF THE PRETECHNICAL PROJECT DESIGNED TO REMOTIVATE UNDERACHIEVING HIGH SCHOOL STUDENTS WHO, UPON SUCCESSFUL COMPLETION OF THE PROGRAM, MAY BE ADMITTED TO THE CAREER PROGRAMS OF THE COMMUNITY COLLEGE. DEVELOPED BY A COMMITTEE OF TEACHERS AT THE LOCAL LEVEL, THE MANUAL IS INTENDED TO ASSIST TEACHERS,…

  2. Fill in the Blank: Culture Jamming and the Advertising of Agency

    ERIC Educational Resources Information Center

    Lambert-Beatty, Carrie

    2010-01-01

    This article is a review on billboard liberation and some other projects that develop the idea of talking back or over advertising in a playful and youthful way. In one of them, Ji Lee's Bubble Project, an artist places blank thought-bubble stickers on street advertisements and waits to see what people write on them, completing the work of art and…

  3. Employability and the UseMyAbility Online Tool: Raising Sports Students' Awareness to Inform the Development of Their Skills and Attributes

    ERIC Educational Resources Information Center

    Breeze, Nick; Barber, Lerverne; Chapman, Val; Beaman-Evans, Charlotte; Beeching, Kelvin

    2016-01-01

    The collaborative project UseMyAbility (UMA) sought to reduce discrimination and enhance disabled graduates' employability through equipping them with the skills to match employability skills and attributes. An outcome from the project, completed in 2011, was a web-based tool which gave students advice on how to improve their employability.…

  4. Curriculum Guide, C.E.I.T.--Ninth Grade, Transportation Technology. Point Pleasant Junior High School, Point Pleasant, West Virginia, 1977-1978.

    ERIC Educational Resources Information Center

    Kleine, Richard E.; Hamme, Randall

    The result of a curriculum development project known as Project Open, this curriculum guide offers an elective course on transportation systems for ninth graders who are participating in the Career Exploration in Technology (CEIT) program and who have completed the eighth-grade course on manufacturing systems. The course, which spans two…

  5. Molokai Farm Project. An Agricultural Training Program of the Maui Community College, University of Hawaii. Report for Fiscal Year 1982-83.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Agriculture, Honolulu.

    The Molokai Farm Project at Maui Community College grew out of a grant for a Youth Agricultural Entrepreneurship Demonstration Program. The program, which can lead either to an associate degree or to a certification of completion for any number of smaller units of course work, is designed to develop students' managerial proficiency and the…

  6. Estimating the Cost to do a Cost Estimate

    NASA Technical Reports Server (NTRS)

    Remer, D. S.; Buchanan, H. R.

    1998-01-01

    This article provides a model for estimating the cost required to do a cost estimate. Overruns may lead to concellation of a project. In 1991, we completed a study on the cost of doing cost estimates for the class of projects normally encountered in the development and implementation of equipment at the network of tracking stations operated by the Jet Propulsion Laboratory (JPL) for NASA.

  7. Development and implementation of a monitoring and information system to increase water use efficiency in arid and semi-arid areas in Limarí, Central Chile (WEIN)

    NASA Astrophysics Data System (ADS)

    Berger, Erich; Balmert, David; Richter, Jürgen

    2016-10-01

    The project WEIN was funded by the Federal Ministry of Education and Research (BMBF | Berlin, Germany) in the framework of the high-tech strategy of Germany's program "KMU-Innovativ". The project started in 2012 and was completed in 2014. In the scope of the project, an integrated system for analysis, monitoring and information at river basin level was developed, which provides relevant information for all stakeholders that are concerned with water resource issues. The main objective of the project was to improve water use efficiency and hence ensure the agricultural production in the region. The pilot region, in which this system was implemented, is the semi-arid Limarí basin in Northern Central Chile. One of the main parts of the project was the development and implementation of a web- and app-based irrigation water ordering and accounting system for local farmers.

  8. Solutions for Digital Video Transmission Technology Final Report CRADA No. TC02068.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, A. T.; Rivers, W.

    This Project aimed at development of software for seismic data processing based on the Geotool code developed by the American company Multimax., Inc. The Geotool code was written in early 90-es for the UNIX platform. Under Project# 2821, functions of the old Geotool code were transferred into a commercial version for the Microsoft XP and Vista platform with addition of new capabilities on visualization and data processing. The developed new version of the Geotool+ was implemented using the up-to-date tool Microsoft Visual Studio 2005 and uses capabilities of the .NET platform. C++ was selected as the main programming language formore » the Geotool+. The two-year Project was extended by six months and funding levels increased from 600,000 to $670,000. All tasks were successfully completed and all deliverables were met for the project even though both the industrial partner and LLNL principal investigator left the project before its final report.« less

  9. U.S. Geological Survey science for the Wyoming Landscape Conservation Initiative—2016 annual report

    USGS Publications Warehouse

    Bowen, Zachary H.; Aikens, Ellen; Aldridge, Cameron L.; Anderson, Patrick J.; Assal, Timothy J.; Chalfoun, Anna D.; Chong, Geneva W.; Eddy-Miller, Cheryl; Garman, Steven L.; Germaine, Stephen S.; Homer, Collin G.; Johnston, Aaron; Kauffman, Matthew J.; Manier, Daniel J.; Melcher, Cynthia P.; Miller, Kirk A.; Walters, Annika W.; Wheeler, Jerrod D.; Wieferich, Daniel; Wilson, Anna B.; Wyckoff, Teal B.; Zeigenfuss, Linda C.

    2018-05-10

    This is the ninth annual report highlighting U.S. Geological Survey (USGS) science and decision-support activities conducted for the Wyoming Landscape Conservation Initiative (WLCI). The activities address specific management needs identified by WLCI partner agencies. In fiscal year (FY) 2016, there were 26 active USGS WLCI science-based projects. Of these 26 projects, one project was new for FY2016, and three were completed by the end of the fiscal year (though final products were still in preparation or review). USGS WLCI projects were grouped under five categories: (1) Baseline Synthesis, (2) Long-Term Monitoring, (3) Effectiveness Monitoring, (4) Mechanistic Studies of Wildlife, and (5) Data and Information Management. Each of these topic areas is designed to address WLCI management needs: identifying key drivers of change, identifying the condition and distribution of key wildlife species and habitats and of species’ habitat requirements, development of an integrated inventory and monitoring strategy, use of emerging technologies and development and testing of innovative methods for maximizing the efficiency and efficacy of monitoring efforts, evaluating the effectiveness of habitat treatment projects, evaluating the responses of wildlife to development, and developing a data clearinghouse and information management framework to support and provide access to results of most USGS WLCI projects.In FY2016, we assisted with updating the WLCI Conservation Action Plan and associated databases as part of the Comprehensive Assessment, and we also assisted with the Bureau of Land Management 2015 WLCI annual report. By the end of FY2016, we completed or had nearly completed assessments of WLCI energy and mineral resources and had submitted a manuscript on modeled effects of oil and gas development on wildlife to a peer-reviewed journal. We also initiated a study on the effects of wind energy on wildlife in the WLCI region. A USGS circular on WLCI long-term monitoring was in review at the end of the fiscal year, and seven projects monitoring water and vegetation (including changes in sagebrush cover and patterns of sagebrush mortality) continued through the year. USGS scientists continued many projects in FY2016 that evaluate the effectiveness of habitat conservation actions (including sagebrush, cheatgrass, and aspen habitat treatments) and provide tools in support of mechanistic studies of wildlife. In FY2016, USGS scientists, along with university and State partners, continued work on five focal wildlife species/communities (pygmy rabbits [Brachylagus idahoensis], greater sage grouse , mule deer, sagebrush songbirds, and native fish). In FY2016, the USGS Information Management Team presented information to WLCI scientists on how USGS tools and resources can be used to fulfill the requirements of new USGS policies regarding data release, data management, and data visualization.

  10. Response of loblolly pine to complete woody and herbaceous control: projected yields and economic outcomes - the COMProject

    Treesearch

    James H. Miller; R.L. Busby; B.R. Zutter; S.M. Zedaker; M.B. Edwards; R.A. Newbold

    1995-01-01

    Abstract.Age-8 and -9 data from the 13 study plantations of the Competition Omission Monitoring Project (COMP) were used to project yields and derive economic outcomes for loblolly pine (Pinus taeda L.). COMP treatments were chop-burn, complete woody plant control, complete herbaceous plant control for 4 years, and complete woody...

  11. Development of wave and surge atlas for the design and protection of coastal bridges in South Louisiana : [research project capsule].

    DOT National Transportation Integrated Search

    2015-03-01

    The recently completed Louisiana Department of Transportation and Development : (DOTD) Storm Surge and Wave Atlas contains signi cant hydraulic information that will : be useful in analyzing storm surge and wave forces on existing and new coastal ...

  12. Development of a Competency-Based Vocational Education IEP Model. Final Report.

    ERIC Educational Resources Information Center

    Bloomsburg Univ., PA.

    A project completed and field tested the concept of vocational instructors and special educators jointly planning curriculum objectives for the handicapped/special needs learner. The diagnostic-prescriptive individualized education (IEP) model developed at Bloomsburg University (Pennsylvania) or IEP Planner was used. Eight occupational areas were…

  13. A Rolling Evaluation Gathers No Moss.

    ERIC Educational Resources Information Center

    Burrough, Lee Anne; Beaumont, Lorrie; Schaller, David; Cannon, Ethalinda

    Continuous, formative evaluation, from inception to completion, with rapid revisions, was key to the successful development of Kids Design Network(KDN) by the DuPage Children's Museum (DCM). Although a thorough evaluation plan was developed at the beginning of the project, it soon became apparent that additional strategies were necessary to insure…

  14. 24 CFR 965.302 - Requirements for energy audits.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...

  15. 24 CFR 965.302 - Requirements for energy audits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...

  16. 24 CFR 965.302 - Requirements for energy audits.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...

  17. 24 CFR 965.302 - Requirements for energy audits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...

  18. 24 CFR 965.302 - Requirements for energy audits.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...

  19. Development of a preschool child pedestrian traffic safety program, the Walking in Traffic Safety (WITS) program for preschoolers

    DOT National Transportation Integrated Search

    1985-01-01

    This report presents an overview of the process followed in developing the 22 WITS booklets for preschoolers, parents, and teachers. The steps involved in completing this project are described: (1) conduct of an in-depth review of the literature, (2)...

  20. Model Vocational Curriculum Development. Final Report.

    ERIC Educational Resources Information Center

    Lake Stevens School District No. 4, WA.

    This guidance instrument (student four-year planning form), middle school program, and student learning objectives for all career and vocational education courses to be changed or added represent the products of a Lake Stevens School District, Washington, curriculum development project. The guidance instrument is a form to be completed by…

  1. A case study of autonomy and motivation in a student-led game development project

    NASA Astrophysics Data System (ADS)

    Prigmore, M.; Taylor, R.; De Luca, D.

    2016-07-01

    This paper presents the findings of an exploratory case study into the relationship between student autonomy and motivation in project based learning, using Self-Determination Theory (SDT) to frame the investigation. The case study explores how different forms of motivation affect the students' response to challenges and their intention to complete the project. Earlier studies have made little explicit use of theoretical perspectives on student autonomy and motivation, a weakness this study attempts to address. As an exploratory case study seeking to evaluate the suitability of a particular theoretical framework, we chose a small case: three students on a one-term computer games development project. Given the small scale, the approach is necessarily qualitative, drawing on project documentation and one-to-one interviews with the students. Our conclusion is that the concepts of SDT provide a useful framework for analysing students' motivations to undertake project work, and its predictions can offer useful guidance on how to initiate and supervise such projects.

  2. Review of potential EGS sites and possible EGS demonstration scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1999-09-01

    Review of potential sites for Enhanced Geothermal Systems (EGS) and development of reference scenarios for EGS demonstration projects are two sub-tasks included in the FY 1999 EGS Research and Development (R&D) Management Task (DOE Task Order Number DE-AT07-99ID60365, included in the Appendix of this report). These sub-tasks are consistent with the EGS Strategic Plan, which includes milestones relating to EGS site selection (Milestone 4, to be completed in 2004) and development of a cost-shared, pilot-scale demonstration project (Milestone 5, to be completed in 2008). The purpose of the present work is to provide some reference points for discussing what typemore » of EGS projects might be undertaken, where they might be located, and what the associated benefits are likely to be. The review of potential EGS sites is presented in Chapter 2 of this report. It draws upon site-selection criteria (and potential project sites that were identified using those criteria) developed at a mini-workshop held at the April 1998 DOE Geothermal Program Review to discuss EGS R&D issues. The criteria and the sites were the focus of a paper presented at the 4th International Hot Dry Rock Forum in Strasbourg in September 1998 (Sass and Robertson-Tait, 1998). The selection criteria, project sites and possible EGS developments discussed in the workshop and paper are described in more detail herein. Input from geothermal operators is incorporated, and water availability and transmission-line access are emphasized. The reference scenarios for EGS demonstration projects are presented in Chapter 3. Three alternative scenarios are discussed: (1) a stand-alone demonstration plant in an area with no existing geothermal development; (2) a separate generating facility adjacent to an existing geothermal development; and (3) an EGS project that supplies an existing geothermal power plant with additional generating capacity. Furthermore, information potentially useful to DOE in framing solicitations and selecting projects for funding is discussed objectively. Although defined as separate sub-tasks, the EGS site review and reference scenarios are closely related. The incremental approach to EGS development that has recently been adopted could logically be expected to yield proposals for studies that lead up to and include production-enhancement experiments in producing geothermal fields in the very near future. However, the strategic plan clearly calls for the development of a more comprehensive demonstration project that can generate up to perhaps 10 MW (gross). It is anticipated that a series of small-scale experiments will define what realistically may be achieved in the near future, thus setting the stage for a successful pilot demonstration. This report continues the process of presenting information on EGS sites and experiments, and begins the process of defining what a demonstration project might be.« less

  3. Research-Practice Linkages in Extension Leadership Development Programs: Focus on Community Leadership Development Programs. A Report.

    ERIC Educational Resources Information Center

    Vandenberg, Lela; And Others

    The Research-Practice Linkages Project sought to identify the knowledge base supporting community leadership development (CLD) programs of the Cooperative Extension Service and to determine linkages between Extension programs and CLD research. A mail questionnaire was completed by 492 Extension staff involved in CLD programs in 18 states and 42…

  4. Military housing foam application and analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torres, J. J.

    2012-03-01

    Sandia and Forest City have established a Cooperative Research and Development Agreement (CRADA), the partnership provides a unique opportunity to take technology research and development from demonstration to application in sustainable communities. This project consists of two activities conducted in Hawaii that focus on performance, integration and application of energy saving technologies. Hawaii has many energy challenges, making this location an excellent testbed for these activities. Under this project, spray foam technology was applied at military housing on Oahu and the consumption data collected. A cost benefit and operational analysis of the foam was completed. The second phase of thismore » project included design, integration, and analysis of photovoltaic systems at a military community on Oahu. This phase of the project was conducted as part of Forest City's second Solar America Showcase Award.« less

  5. ISTC projects devoted to improving laser beam quality

    NASA Astrophysics Data System (ADS)

    Malakhov, Yu. I.

    2007-05-01

    Short overview is done about the activity of ISTC in a direction concerned with improving powerful laser beam quality by means of nonlinear and linear adaptive optics methods. Completed projects #0591 and #1929 resulted in the development of a stimulated Brillouin scattering (SBS) phase conjugation mirror of superhigh fidelity employing the kinoform optical elements (rasters of small lenses) of new generation designed for pulsed or pulse-periodic lasers with nanosecond scale pulse duration. Project #2631 is devoted to development of an adaptive optical system for phase registration and correction of laser beams with wave front vortices. The principles of operation of conventional adaptive systems are based on the assumption that the phase is a smooth continuous function in space. Therefore the solution of the Project tasks will assume a new step in adaptive optics.

  6. Microcirculation and the physiome projects.

    PubMed

    Bassingthwaighte, James B

    2008-11-01

    The Physiome projects comprise a loosely knit worldwide effort to define the Physiome through databases and theoretical models, with the goal of better understanding the integrative functions of cells, organs, and organisms. The projects involve developing and archiving models, providing centralized databases, and linking experimental information and models from many laboratories into self-consistent frameworks. Increasingly accurate and complete models that embody quantitative biological hypotheses, adhere to high standards, and are publicly available and reproducible, together with refined and curated data, will enable biological scientists to advance integrative, analytical, and predictive approaches to the study of medicine and physiology. This review discusses the rationale and history of the Physiome projects, the role of theoretical models in the development of the Physiome, and the current status of efforts in this area addressing the microcirculation.

  7. Procurement Specifications Templates for On-Site Solar Photovoltaic: For Use in Developing Federal Solicitations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, G.

    With the increasing adaption of on-site renewable energy systems designed to feed site loads, there is a critical need to develop tools that allow the federal sector to become a mature and sophisticated consumer. This document is intended to reduce project development and operational risks while increasing the speed at which projects are completed; two necessary components to reach the scale required to meet mandates and achieve cost savings for taxpayers. This guide is intended to act as a living document where lessons learned from the increasing number of projects can be incorporated and provide guidance for efforts. While additionalmore » guides will be developed to cover other renewable technologies, this guide covers on-site solar photovoltaic systems with an emphasis on third-party designed, financed, owned, and operated systems.« less

  8. The NEED (National Energy Education Development) Project

    NASA Astrophysics Data System (ADS)

    Hogan, D.; Spruill, M.

    2012-04-01

    The NEED (National Energy Education Development) Project is a non-profit organization which provides a wide range of K-12 curriculum on energy education topics. The curriculum is specific for primary, elementary, intermediate and secondary levels with age appropriate activities and reading levels. The NEED Project covers a wide range of topics from wind energy, nuclear energy, solar energy, hydropower, hydrogen, fossil fuels, energy conservation, energy efficiency and much more. One of the major strengths of this organization is its Teacher Advisory Board. The curriculum is routinely revised and updated by master classroom teachers who use the lessons and serve on the advisory board. This ensures it is of the highest quality and a useful resource. The NEED Project through a variety of sponsors including businesses, utility companies and government agencies conducts hundreds of teacher professional development workshops each year throughout the United States and have even done some workshops internationally. These workshops are run by trained NEED facilitators. At the workshops, teachers gain background understanding of the energy topics and have time to complete the hands on activities which make up the curriculum. The teachers are then sent a kit of equipment after successfully completing the workshop. This allows them to teach the curriculum and have their students perform the hands on labs and activities in the classroom. The NEED Project is the largest provider of energy education related curriculum in the United States. Their efforts are educating teachers about energy topics and in turn educating students in the hope of developing citizens who are energy literate. Many of the hands on activities used to teach about various energy sources will be described and demonstrated.

  9. It's More than an Art Project. Activity.

    ERIC Educational Resources Information Center

    Wright, Phyllis; Wright, Thomas

    1998-01-01

    Shows how a first-grade class explored the activities that are completed by people who design products, develop production systems, use materials and machines to make goods, and market the output from manufacturing plants. (JOW)

  10. Advanced proceedings of the second classification yard technology workshop

    DOT National Transportation Integrated Search

    1981-05-01

    The purpose of this workshop was to present recent developments in yard related research along with discussing problem areas deserving further research. Also, railroad representatives will present reports on recently completed yard projects especiall...

  11. 34 CFR 645.14 - What additional services do Veterans Upward Bound projects provide?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... basic skills development in those academic subjects required for successful completion of a high school... refresher courses for veterans who are high school graduates but who have delayed pursuing postsecondary...

  12. Structural significance of mechanical damage.

    DOT National Transportation Integrated Search

    2012-05-01

    The letter transmits the Final Report for work completed under US DOT PHMSA Other Transaction Agreement (OTA) DTPH56-08-T-000011, Structural Significance of Mechanical Damage. The project was implemented to develop a detailed experimental database on...

  13. The Year of Transition in Review

    DTIC Science & Technology

    2007-01-01

    quarter that 114 border forts have been constructed thus far, and 5 points of entry have been completed.315 SIGIR’s ground project surveys ...security services.366 Lt. Gen. Dempsey recently estimated that 20-25% of the National Police “needed to be weeded out.”367 Finally, recent surveys ...sector development Transportation and Communications system, 33 site surveys have been completed for the communication towers between Mosul and

  14. Workstation-Based Avionics Simulator to Support Mars Science Laboratory Flight Software Development

    NASA Technical Reports Server (NTRS)

    Henriquez, David; Canham, Timothy; Chang, Johnny T.; McMahon, Elihu

    2008-01-01

    The Mars Science Laboratory developed the WorkStation TestSet (WSTS) to support flight software development. The WSTS is the non-real-time flight avionics simulator that is designed to be completely software-based and run on a workstation class Linux PC. This provides flight software developers with their own virtual avionics testbed and allows device-level and functional software testing when hardware testbeds are either not yet available or have limited availability. The WSTS has successfully off-loaded many flight software development activities from the project testbeds. At the writing of this paper, the WSTS has averaged an order of magnitude more usage than the project's hardware testbeds.

  15. Diaspora, faith, and science: building a Mouride hospital in Senegal.

    PubMed

    Foley, Ellen E; Babou, Cheikh Anta

    2011-01-01

    This article examines a development initiative spearheaded by the members of a transnational diaspora – the creation of a medical hospital in the holy city of Touba in central Senegal. Although the construction of the hospital is decidedly a philanthropic project, Hôpital Matlaboul Fawzaini is better understood as part of the larger place-making project of the Muridiyya and the pursuit of symbolic capital by a particular Mouride "dahira". The "dahira's" project illuminates important processes of forging global connections and transnational localities, and underscores the importance of understanding the complex motivations behind diaspora development. The hospital's history reveals the delicate negotiations between state actors and diaspora organizations, and the complexities of public–private partnerships for development. In a reversal of state withdrawal in the neo-liberal era, a diaspora association was able to wrest new financial commitments from the state by completing a large infrastructure project. Despite this success, we argue that these kinds of projects, which are by nature uneven and sporadic, reflect particular historical conjunctures and do not offer a panacea for the failure of state-led development.

  16. Ceramic technology for advanced heat engines project. Semiannual progress report, October 1985-March 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-08-01

    Significant accomplishments in fabricating cermaic components for the Department of Energy (DOE), National Aeronautics and Space Administration (NASA), and Department of Defense (DOD) advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. However, additional research is needed in materials and processing development, design methodology, and data base and life prediction. An assessment of needs was completed, and a five-year project plan was developed with extensive input from private industry. The objective of the project is to develop the industrial technology base required for reliable ceramics for application in advanced automotivemore » heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. although this is a generic materials project, the focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines.« less

  17. The Yeast Deletion Collection: A Decade of Functional Genomics

    PubMed Central

    Giaever, Guri; Nislow, Corey

    2014-01-01

    The yeast deletion collections comprise >21,000 mutant strains that carry precise start-to-stop deletions of ∼6000 open reading frames. This collection includes heterozygous and homozygous diploids, and haploids of both MATa and MATα mating types. The yeast deletion collection, or yeast knockout (YKO) set, represents the first and only complete, systematically constructed deletion collection available for any organism. Conceived during the Saccharomyces cerevisiae sequencing project, work on the project began in 1998 and was completed in 2002. The YKO strains have been used in numerous laboratories in >1000 genome-wide screens. This landmark genome project has inspired development of numerous genome-wide technologies in organisms from yeast to man. Notable spinoff technologies include synthetic genetic array and HIPHOP chemogenomics. In this retrospective, we briefly describe the yeast deletion project and some of its most noteworthy biological contributions and the impact that these collections have had on the yeast research community and on genomics in general. PMID:24939991

  18. KSC-2009-6453

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – A ceremonial "flipping of the switch" officially begins operation of NASA's first large-scale solar power generation facility at NASA's Kennedy Space Center in Florida. Flipping the four-foot-tall light switch in unison are, from left, Bob Cabana, Kennedy center director; Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation; and Eric Silagy, Florida Power & Light Company vice president and chief development officer. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  19. NEXT Ion Propulsion System Development Status and Capabilities

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Benson, Scott W.

    2008-01-01

    NASA s Evolutionary Xenon Thruster (NEXT) project is developing next generation ion propulsion technologies to provide future NASA science missions with enhanced mission performance benefit at a low total development cost. The objective of the NEXT project is to advance next generation ion propulsion technology by producing engineering model system components, validating these through qualification-level and integrated system testing, and ensuring preparedness for transitioning to flight system development. As NASA s Evolutionary Xenon Thruster technology program completes advanced development activities, it is advantageous to review the existing technology capabilities of the system under development. This paper describes the NEXT ion propulsion system development status, characteristics and performance. A review of mission analyses results conducted to date using the NEXT system is also provided.

  20. First-line nurse leaders' health-care change management initiatives.

    PubMed

    Macphee, Maura; Suryaprakash, Nitya

    2012-03-01

    To examine nurse leaders' change management projects within British Columbia, Canada. British Columbia Nursing Leadership Institute 2007-10 attendees worked on year-long change management initiatives/projects of importance to their respective health-care institutions. Most leaders were in first-line positions with <3 years' experience. Consenting leaders' project reports (N = 133) were content analysed for specific themes: types of projects; scope of projects (e.g. unit or local level, departmental, institutional); influence targets or key stakeholder groups targeted by the projects; leadership successes and challenges. Of study participants, 77% successfully completed their projects. Staff tool and resource development and existing services improvement were major project types. Care delivery teams were the major influence targets. Only 25% of projects were at the unit level. Many projects had broader scopes, such as institutional levels. Participants cited multiple leadership successes, including enhanced leadership styles and organizational skills. First-line nurse leaders were able to successfully manage projects beyond their traditional scope of responsibilities. The majority of projects dealt with staff needs and healthcare restructuring initiatives. Constant change is a global reality. Change management, a universal competency, must be included in leadership development programmes. © 2011 Blackwell Publishing Ltd.

  1. Using Student Learning and Development Outcomes to Evaluate a First-Year Undergraduate Group Video Project

    PubMed Central

    Jensen, Murray; Mattheis, Allison; Johnson, Brady

    2012-01-01

    Students in an interdisciplinary undergraduate introductory course were required to complete a group video project focused on nutrition and healthy eating. A mixed-methods approach to data collection involved observing and rating video footage of group work sessions and individual and focus group interviews. These data were analyzed and used to evaluate the effectiveness of the assignment in light of two student learning outcomes and two student development outcomes at the University of Minnesota. Positive results support the continued inclusion of the project within the course, and recommend the assignment to other programs as a viable means of promoting both content learning and affective behavioral objectives. PMID:22383619

  2. Using student learning and development outcomes to evaluate a first-year undergraduate group video project.

    PubMed

    Jensen, Murray; Mattheis, Allison; Johnson, Brady

    2012-01-01

    Students in an interdisciplinary undergraduate introductory course were required to complete a group video project focused on nutrition and healthy eating. A mixed-methods approach to data collection involved observing and rating video footage of group work sessions and individual and focus group interviews. These data were analyzed and used to evaluate the effectiveness of the assignment in light of two student learning outcomes and two student development outcomes at the University of Minnesota. Positive results support the continued inclusion of the project within the course, and recommend the assignment to other programs as a viable means of promoting both content learning and affective behavioral objectives.

  3. NASA Ames DEVELOP Interns: Helping the Western United States Manage Natural Resources One Project at a Time

    NASA Technical Reports Server (NTRS)

    Justice, Erin; Newcomer, Michelle

    2010-01-01

    The western half of the United States is made up of a number of diverse ecosystems ranging from arid desert to coastal wetlands and rugged forests. Every summer for the past 7 years students ranging from high school to graduate level gather at NASA Ames Research Center (ARC) as part of the DEVELOP Internship Program. Under the guidance of Jay Skiles [Ames Research Center (ARC) - Ames DEVELOP Manager] and Cindy Schmidt [ARC/San Jose State University Ames DEVELOP Coordinator] they work as a team on projects exploring topics including: invasive species, carbon flux, wetland restoration, air quality monitoring, storm visualizations, and forest fires. The study areas for these projects have been in Washington, Utah, Oregon, Nevada, Hawaii, Alaska and California. Interns combine data from NASA and partner satellites with models and in situ measurements to complete prototype projects demonstrating how NASA data and resources can help communities tackle their Earth Science related problems.

  4. Development of the advanced life support Systems Integration Research Facility at NASA's Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Tri, Terry O.; Thompson, Clifford D.

    1992-01-01

    Future NASA manned missions to the moon and Mars will require development of robust regenerative life support system technologies which offer high reliability and minimal resupply. To support the development of such systems, early ground-based test facilities will be required to demonstrate integrated, long-duration performance of candidate regenerative air revitalization, water recovery, and thermal management systems. The advanced life support Systems Integration Research Facility (SIRF) is one such test facility currently being developed at NASA's Johnson Space Center. The SIRF, when completed, will accommodate unmanned and subsequently manned integrated testing of advanced regenerative life support technologies at ambient and reduced atmospheric pressures. This paper provides an overview of the SIRF project, a top-level description of test facilities to support the project, conceptual illustrations of integrated test article configurations for each of the three SIRF systems, and a phased project schedule denoting projected activities and milestones through the next several years.

  5. Charged particle and magnetic field research in space

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Research completed and in progress is described, related publications and reports are listed, and abstracts of papers and talks on results of the research are given. The charged particle research centered on OGO-5 and OGO-6 electron spectrometer data, and theoretical radiation belt studies. Work on the ATS-1 magnetometer project included development of production data reduction programs, development of spectral analysis procedures, and scientific studies of ULF waves at synchronous orbit. The magnetic fields research also included work on the Mariner project and theoretical studies on the solar wind.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Strykowsky, T. Brown, J. Chrzanowski, M. Cole, P. Heitzenroeder, G.H. Neilson, Donald Rej, and M. Viola

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed,more » several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.« less

  7. Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wright, Bruce Albert

    The Aleutian Pribilof Islands Association was awarded a U.S. Department of Energy Tribal Energy Program grant (DE-EE0005624) for the Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (Project). The goal of the Project was to perform a feasibility study to determine if a tidal energy project would be a viable means to generate electricity and heat to meet long-term fossil fuel use reduction goals, specifically to produce at least 30% of the electrical and heating needs of the tribally-owned buildings in False Pass. The Project Team included the Aleut Region organizations comprised of the Aleutianmore » Pribilof Island Association (APIA), and Aleutian Pribilof Island Community Development Association (APICDA); the University of Alaska Anchorage, ORPC Alaska a wholly-owned subsidiary of Ocean Renewable Power Company (ORPC), City of False Pass, Benthic GeoScience, and the National Renewable Energy Laboratory (NREL). The following Project objectives were completed: collected existing bathymetric, tidal, and ocean current data to develop a basic model of current circulation at False Pass, measured current velocities at two sites for a full lunar cycle to establish the viability of the current resource, collected data on transmission infrastructure, electrical loads, and electrical generation at False Pass, performed economic analysis based on current costs of energy and amount of energy anticipated from and costs associated with the tidal energy project conceptual design and scoped environmental issues. Utilizing circulation modeling, the Project Team identified two target sites with strong potential for robust tidal energy resources in Isanotski Strait and another nearer the City of False Pass. In addition, the Project Team completed a survey of the electrical infrastructure, which identified likely sites of interconnection and clarified required transmission distances from the tidal energy resources. Based on resource and electrical data, the Project Team developed a conceptual tidal energy project design utilizing ORPC’s TidGen® Power System. While the Project Team has not committed to ORPC technology for future development of a False Pass project, this conceptual design was critical to informing the Project’s economic analysis. The results showed that power from a tidal energy project could be provided to the City of False at a rate at or below the cost of diesel generated electricity and sold to commercial customers at rates competitive with current market rates, providing a stable, flat priced, environmentally sound alternative to the diesel generation currently utilized for energy in the community. The Project Team concluded that with additional grants and private investment a tidal energy project at False Pass is well-positioned to be the first tidal energy project to be developed in Alaska, and the first tidal energy project to be interconnected to an isolated micro grid in the world. A viable project will be a model for similar projects in coastal Alaska.« less

  8. A root cause analysis project in a medication safety course.

    PubMed

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  9. 2015 Fermilab Laboratory Directed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wester, W.

    2016-05-26

    The Fermi National Accelerator Laboratory (FNAL) is conducting a Laboratory Directed Research and Development (LDRD) program. Fiscal year 2015 represents the first full year of LDRD at Fermilab and includes seven projects approved mid-year in FY14 and six projects approved in FY15. One of the seven original projects has been completed just after the beginning of FY15. The implementation of LDRD at Fermilab is captured in the approved Fermilab 2015 LDRD Annual Program Plan. In FY15, the LDRD program represents 0.64% of Laboratory funding. The scope of the LDRD program at Fermilab will be established over the next couple ofmore » years where a portfolio of about 20 on-going projects representing approximately between 1% and 1.5% of the Laboratory funding is anticipated. This Annual Report focuses on the status of the current projects and provides an overview of the current status of LDRD at Fermilab.« less

  10. DE-FOA-EE0005502 Advanced Percussive Drilling Technology for Geothermal Exploration and Development Phase II Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Su, Jiann-Cherng; Raymond, David W.; Prasad, Somuri V.

    Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two- phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phasemore » I and evaluating performance of the materials and designs at high- operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for user in the driller's toolbox.« less

  11. Advanced Percussive Drilling Technology for Geothermal Exploration and Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Su, Jiann; Raymond, David; Prasad, Somuri

    Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phasemore » I and evaluating performance of the materials and designs at high operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for use in the driller’s toolbox.« less

  12. Water Resources Management in Turkey as a Case Study Southeastern Anatolia Project (gap)

    NASA Astrophysics Data System (ADS)

    Ačma, Bülent

    2010-05-01

    The Southeastern Anatolia Project (GAP), one of the most important projects for develop remarkable natural resources of the world, is accepted as a change for getting benefit from rich water and agricultural resources of the Southeastern Anatolia Region. The GAP Project has been considered as a regional development projects through years, but the dimensions of sustainability, protection of environment and participatory have been attached to the master of the project in recent years. When the GAP Project is completed, the Upper Mesopotomia, the centers of many civilisation, will re-again its importance as it had in the ancient times, and will be alive a center of civilisation. Moreover, when the problem of water shortage and water supplies in the world for the future is kept in mind, the importance of Southeastern Anatolia's water supplies will be doubled. For this reason, the GAP Project, developed by depending on water and natural resources of the region, will have an important place in the world. The aim of this study is to introduce the region with rich natural resources and the GAP Project. For this reason, firstly, the natural potential of the region will be introduced. Second, The GAP Project will be presented in detailes. In the third stage, the projects being processed for protecting the natural sources and environment will be analyzed. In the last stage, strategies and policies to develop and to protect the natural resources of the region in short, mid, and long terms will be proposed.

  13. Developing Government Renewable Energy Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewablemore » projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.« less

  14. Guidance and Control Software Project Data - Volume 2: Development Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  15. Cohort profile: the Welsh Geriatric Registrar-Led Research Network (WeGeN): rationale, design and description.

    PubMed

    Jelley, Benjamin; Long, Sara; Butler, John; Hewitt, Jonathan

    2017-02-14

    Medical trainees are required to undertake audit and quality improvement projects. They must also have an understanding of the principles of research and are encouraged to participate in research projects. However, the constraints of time, a lack of formal training and rotation between different training posts create barriers to audit cycle completion and pursuing research. This leads to trainees being reluctant to undertake research, facilitates poor quality research and risks incomplete audit. The Welsh Geriatricians Network (WeGeN) has been created with the aims of facilitating collaborative, trainee-led research within Geriatric Medicine in Wales, promoting research engagement and improving the research evidence base for older patients. By coordinating collaborative research projects across different sites within Wales, trainees continue existing projects at new sites, allowing completion of projects and establishing the long-term infrastructure and experienced personnel needed for high-quality research data to be gathered. WeGeN has facilitated 4 national audits, all of which are intended for peer review publication. The first project considers the service provision for the older person in the emergency department, the second Parkinson's disease, the third reviews delirium management and the fourth project considers epidemiology of surgical disease in older people. The objective of this project is to further establish and develop WeGeN as a group which facilitates high-quality research and provides the opportunity for geriatric trainees to engage in research activity. It is anticipated that the establishment of this research platform will provide a blueprint for the development of other such networks in the UK and beyond. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  16. Scaling Studies for Advanced High Temperature Reactor Concepts, Final Technical Report: October 2014—December 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woods, Brian; Gutowska, Izabela; Chiger, Howard

    Computer simulations of nuclear reactor thermal-hydraulic phenomena are often used in the design and licensing of nuclear reactor systems. In order to assess the accuracy of these computer simulations, computer codes and methods are often validated against experimental data. This experimental data must be of sufficiently high quality in order to conduct a robust validation exercise. In addition, this experimental data is generally collected at experimental facilities that are of a smaller scale than the reactor systems that are being simulated due to cost considerations. Therefore, smaller scale test facilities must be designed and constructed in such a fashion tomore » ensure that the prototypical behavior of a particular nuclear reactor system is preserved. The work completed through this project has resulted in scaling analyses and conceptual design development for a test facility capable of collecting code validation data for the following high temperature gas reactor systems and events— 1. Passive natural circulation core cooling system, 2. pebble bed gas reactor concept, 3. General Atomics Energy Multiplier Module reactor, and 4. prismatic block design steam-water ingress event. In the event that code validation data for these systems or events is needed in the future, significant progress in the design of an appropriate integral-type test facility has already been completed as a result of this project. Where applicable, the next step would be to begin the detailed design development and material procurement. As part of this project applicable scaling analyses were completed and test facility design requirements developed. Conceptual designs were developed for the implementation of these design requirements at the Oregon State University (OSU) High Temperature Test Facility (HTTF). The original HTTF is based on a ¼-scale model of a high temperature gas reactor concept with the capability for both forced and natural circulation flow through a prismatic core with an electrical heat source. The peak core region temperature capability is 1400°C. As part of this project, an inventory of test facilities that could be used for these experimental programs was completed. Several of these facilities showed some promise, however, upon further investigation it became clear that only the OSU HTTF had the power and/or peak temperature limits that would allow for the experimental programs envisioned herein. Thus the conceptual design and feasibility study development focused on examining the feasibility of configuring the current HTTF to collect validation data for these experimental programs. In addition to the scaling analyses and conceptual design development, a test plan was developed for the envisioned modified test facility. This test plan included a discussion on an appropriate shakedown test program as well as the specific matrix tests. Finally, a feasibility study was completed to determine the cost and schedule considerations that would be important to any test program developed to investigate these designs and events.« less

  17. Preparation of a Natural Product Extract Library for Investigation Against Disease States Specific to Defence Health: A Mini Long Range Research Project

    DTIC Science & Technology

    2009-02-01

    Sci in 1994 and with a BSc(Hons) in 1995 from The University of Melbourne. In 1999 he completed a PhD in marine natural products chemistry from the...BSc(Hons) in 1994 from the University of Melbourne. In 1998 she completed a PhD in organic chemistry , developing new free-radical syntheses of some...Melissa began work in the area of medicinal chemistry , developing partial agonists of adenosine A1 receptors; firstly at Deakin University and

  18. U.S. Geological Survey Science for the Wyoming Landscape Conservation Initiative - 2013 Annual Report

    USGS Publications Warehouse

    Bowen, Zachary H.; Aldridge, Cameron L.; Anderson, Patrick J.; Assal, Timothy J.; Bern, Carleton R.; Biewick, Laura R; Boughton, Gregory K.; Chalfoun, Anna D.; Chong, Geneva W.; Dematatis, Marie K.; Fedy, Bradley C.; Garman, Steven L.; Germaine, Stephen S.; Hethcoat, Matthew G.; Homer, Collin G.; Huber, Christopher; Kauffman, Matthew J.; Latysh, Natalie; Manier, Daniel; Melcher, Cynthia P.; Miller, Kirk A.; Potter, Christopher J.; Schell, Spencer; Sweat, Michael J.; Walters, Annika W.; Wilson, Anna B.

    2014-01-01

    This is the sixth report produced by the U.S. Geological Survey (USGS) for the Wyoming Landscape Conservation Initiative (WLCI) to detail annual activities conducted by USGS for addressing specific management needs identified by WLCI partners. In FY2013, there were 25 ongoing and new projects conducted by the USGS. These projects fall into 8 major categories: (1) synthesizing and analyzing existing data to describe (model and map) current conditions on the landscape; (2) developing models for projecting past and future landscape conditions; (3) monitoring indicators of ecosystem conditions and the effectiveness of on-the-ground habitat projects; (4) conducting research to elucidate the mechanisms underlying wildlife and habitat responses to changing land uses; (5) managing and making accessible the large number of databases, maps, and other products being developed; (6) helping to integrate WLCI outcomes with future habitat enhancement and research projects; (7) coordinating efforts among WLCI partners; and (8) providing support to WLCI decision-makers and assisting with overall evaluation of the WLCI program. The two new projects initiated in FY2013 address (1) important agricultural lands in southwestern Wyoming, and (2) the influence of energy development on native fish communities. The remaining activities entailed our ongoing efforts to compile data, model landscape conditions, monitor trends in habitat conditions, conduct studies of wildlife responses to energy development, and upgrade Web-based products in support of both individual and overall WLCI efforts. Milestone FY2013 accomplishments included completing the development of a WLCI inventory and monitoring framework and the associated monitoring strategies, protocols, and analytics; and initial development of an Interagency Inventory and Monitoring Database, which will be accessible through the Monitoring page of the WLCI Web site at http://www.wlci.gov/monitoring. We also completed the initial phase of the mountain shrub-mapping project in the Big Piney-La Barge mule deer winter range. Finally, a 3-year survey of pygmy rabbits in four major gas-field areas was completed and used to validate the pygmy rabbit habitat model/map developed earlier in the project. Important products that became available for use by WLCI partners included publication of USGS Data Series report (http://pubs.usgs.gov/ds/800/pdf/ds800.pdf) that compiles our WLCI land cover and land use data, which depict current and historical patterns of sage-grouse habitat in relation to energy development and will be used to pose “what-if” scenarios to evaluate possible outcomes of alternative land-use strategies and practices on habitat and wildlife. Another important FY2013 product was a journal article (http://aapgbull.geoscienceworld.org/content/97/6/899.full) that describes the Mowry Shale and Frontier formation, which harbors coalbed methane and shale gas resources in Wyoming, Colorado, and Utah, for use in future scenario-building work. We also produced maps and databases that depict the structure and condition of aspen stands in the Little Mountain Ecosystem, and then presented this information to the Bureau of Land Management, Wyoming Game and Fish Department, and other interested entities for supporting aspen-management objectives.

  19. Novel high speed fiber-optic pressure sensor systems.

    DOT National Transportation Integrated Search

    2014-03-01

    The goal of this project is to develop a complete test of this technology for high-speed, high-accuracy applications, specifically cost-effective data acquisition techniques and practical mounting methods tailored for the subject environment. The sec...

  20. Research notes : faster load rating for steel truss bridges.

    DOT National Transportation Integrated Search

    2009-03-01

    The Oregon Department of Transportation (ODOT) Bridge Engineering Section recently completed a project with Oregon State University to develop a viable, more cost-effective alternative to the manually collected field measurement procedure. The new me...

  1. 7 CFR 1924.10 - Making changes in the planned development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... decrease in the cash cost, extension of time, transfer of funds between items, or an addition or deletion... time to complete the project. (2) All changes shall be recorded in chronological order as follows: (i...

  2. 7 CFR 1924.10 - Making changes in the planned development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... decrease in the cash cost, extension of time, transfer of funds between items, or an addition or deletion... time to complete the project. (2) All changes shall be recorded in chronological order as follows: (i...

  3. 7 CFR 1924.10 - Making changes in the planned development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... decrease in the cash cost, extension of time, transfer of funds between items, or an addition or deletion... time to complete the project. (2) All changes shall be recorded in chronological order as follows: (i...

  4. 7 CFR 1924.10 - Making changes in the planned development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... decrease in the cash cost, extension of time, transfer of funds between items, or an addition or deletion... time to complete the project. (2) All changes shall be recorded in chronological order as follows: (i...

  5. KSC-2009-6451

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – Florida Power & Light Company Vice President and Chief Development Officer Eric Silagy, left, and NASA Kennedy Space Center Director Bob Cabana, center, examine one of the solar panels at the unveiling of NASA's first large-scale solar power generation facility at Kennedy in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  6. Recent Developments at the NASA Langley Research Center National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Paryz, Roman W.

    2011-01-01

    Several upgrade projects have been completed or are just getting started at the NASA Langley Research Center National Transonic Facility. These projects include a new high capacity semi-span balance, model dynamics damping system, semi-span model check load stand, data acquisition system upgrade, facility automation system upgrade and a facility reliability assessment. This presentation will give a brief synopsis of each of these efforts.

  7. Energy Transformation in Molecular Electronic Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kasha, Michael

    1999-05-17

    This laboratory has developed many new ideas and methods in the electronic spectroscopy of molecules. This report covers the contract period 1993-1995. A number of the projects were completed in 1996, and those papers are included in the report. The DOE contract was terminated at the end of 1995 owing to a reorganizational change eliminating nationally the projects under the Office of Health and Environmental Research, U. S. Department of Energy.

  8. AAFE man-made noise experiment project. Volume 3: Appendices

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Management and operational considerations involved in the project to measure man-made electromagnetic noise at earth orbital altitudes are discussed. The subjects considered are: (1) launch and orbit of the Scout D vehicles, (2) experiment management, (3) receiver scanning considerations, (4) data handling, and (5) threshold measurements. The storage requirements for a high resolution, complete data storage library are defined. Mathematical models of signal detection probability are developed.

  9. Surgical Tooth Implants, Combat and Field.

    DTIC Science & Technology

    1985-11-15

    project in the development of dental implantology must not be overlooked. The early stages of this project clearly defined that rigid fixation of an...a long-term implant study of a serrated ceramic dental implant designed for fresh extraction sites. The baboon study was successfully completed last...materials. A series of graded dental implants have been produce’ to provide an interference fit in any fresh extraction site. The long-term implant

  10. Crozer-Chester Medical Center Burn Research Projects

    DTIC Science & Technology

    2009-07-01

    Dressing for Autogenous Skin Donor Sites” This study will compare the performance of an agreed upon dressing to the normal standard of care (Xeroform...resuscitation algorithm for the development of a closed loop resuscitation system. a. Complete project start-up activities (hiring and training of...collect data (Year 2, Quarter 1) Study 2, Protocol Title: “Evaluation of Xxx for Autogenous Skin Donor Sites” Task 1: Enroll up to 30 patients in

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reiersen, W.; Heitzenroeder, P.; Neilson, G. H.

    The National Compact Stellarator Experiment (NCSX) is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge National Laboratory (ORNL). The stellarator core is designed to produce a compact 3-D plasma that combines stellarator and tokamak physics advantages. The engineering challenges of NCSX stem from its complex geometry. From the project's start in April, 2003 to September, 2004, the fabrication specifications for the project's two long-lead components, the modular coil winding forms and the vacuum vessel, were developed. An industrial manufacturing R&D program refined the processes for their fabrication as well as production cost andmore » schedule estimates. The project passed a series of reviews and established its performance baseline with the Department of Energy. In September 2004, fabrication was approved and contracts for these components were awarded. The suppliers have completed the engineering and tooling preparations and are in production. Meanwhile, the project completed preparations for winding the coils at PPPL by installing a coil manufacturing facility and developing all necessary processes through R&D. The main activities for the next two years will be component manufacture, coil winding, and sub-assembly of the vacuum vessel and coil subsets. Machine sector sub-assembly, machine assembly, and testing will follow, leading to First Plasma in July 2009.« less

  12. A standardized curriculum to introduce novice health professional students to practice-based learning and improvement: a multi-institutional pilot study.

    PubMed

    Huntington, Jonathan T; Dycus, Paula; Hix, Carolyn; West, Rita; McKeon, Leslie; Coleman, Mary T; Hathaway, Donna; McCurren, Cynthia; Ogrinc, Greg

    2009-01-01

    Practice-based learning and improvement (PBLI) combines the science of continuous quality improvement with the pragmatics of day-to-day clinical care delivery. PBLI is a core-learning domain in nursing and medical education. We developed a workbook-based, project-focused curriculum to teach PBLI to novice health professional students. Evaluate the efficacy of a standardized curriculum to teach PBLI. Nonrandomized, controlled trial with medical and nursing students from 3 institutions. Faculty used the workbook to facilitate completion of an improvement project with 16 participants. Both participants and controls (N = 15) completed instruments to measure PBLI knowledge and self-efficacy. Participants also completed a satisfaction survey and presented project posters at a national conference. There was no significant difference in PBLI knowledge between groups. Self-efficacy of participants was higher than that of controls in identifying best practice, identifying measures, identifying successful local improvement work, implementing a structured change plan, and using Plan-Do-Study-Act methodology. Participant satisfaction with the curriculum was high. Although PBLI knowledge was similar between groups, participants had higher self-efficacy and confidently disseminated their findings via formal poster presentation. This pilot study suggests that using a workbook-based, project-focused approach may be effective in teaching PBLI to novice health professional students.

  13. Spacecraft optical disk recorder memory buffer control

    NASA Technical Reports Server (NTRS)

    Hodson, Robert F.

    1993-01-01

    This paper discusses the research completed under the NASA-ASEE summer faculty fellowship program. The project involves development of an Application Specific Integrated Circuit (ASIC) to be used as a Memory Buffer Controller (MBC) in the Spacecraft Optical Disk System (SODR). The SODR system has demanding capacity and data rate specifications requiring specialized electronics to meet processing demands. The system is being designed to support Gigabit transfer rates with Terabit storage capability. The complete SODR system is designed to exceed the capability of all existing mass storage systems today. The ASIC development for SODR consist of developing a 144 pin CMOS device to perform format conversion and data buffering. The final simulations of the MBC were completed during this summer's NASA-ASEE fellowship along with design preparations for fabrication to be performed by an ASIC manufacturer.

  14. The CP-PACS Project and Lattice QCD Results

    NASA Astrophysics Data System (ADS)

    Iwasaki, Y.

    The aim of the CP-PACS project was to develop a massively parallel computer for performing numerical research in computational physics with primary emphasis on lattice QCD. The CP-PACS computer with a peak speed of 614 GFLOPS with 2048 processors was completed in September 1996, and has been in full operation since October 1996. We present an overview of the CP-PACS project and describe characteristics of the CP-PACS computer. The CP-PACS has been mainly used for hadron spectroscopy studies in lattice QCD. Main results in lattice QCD simulations are given.

  15. Image Matrix Processor for Volumetric Computations Final Report CRADA No. TSB-1148-95

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberson, G. Patrick; Browne, Jolyon

    The development of an Image Matrix Processor (IMP) was proposed that would provide an economical means to perform rapid ray-tracing processes on volume "Giga Voxel" data sets. This was a multi-phased project. The objective of the first phase of the IMP project was to evaluate the practicality of implementing a workstation-based Image Matrix Processor for use in volumetric reconstruction and rendering using hardware simulation techniques. Additionally, ARACOR and LLNL worked together to identify and pursue further funding sources to complete a second phase of this project.

  16. SKA Telescope Manager (TM): status and architecture overview

    NASA Astrophysics Data System (ADS)

    Natarajan, Swaminathan; Barbosa, Domingos; Barraca, Joao P.; Bridger, Alan; Choudhury, Subhrojyoti R.; Di Carlo, Matteo; Dolci, Mauro; Gupta, Yashwant; Guzman, Juan; Van den Heever, Lize; Le Roux, Gerhard; Nicol, Mark; Patil, Mangesh; Smareglia, Riccardo; Swart, Paul; Thompson, Roger; Vrcic, Sonja; Williams, Stewart

    2016-07-01

    The SKA radio telescope project is building two telescopes, SKA-Low in Australia and SKA-Mid in South Africa respectively. The Telescope Manager is responsible for the observations lifecycle and for monitoring and control of each instrument, and is being developed by an international consortium. The project is currently in the design phase, with the Preliminary Design Review having been successfully completed, along with re-baselining to match project scope to available budget. This report presents the status of the Telescope Manager work, key architectural challenges and our approach to addressing them.

  17. The international charter for space and major disasters--project manager training

    USGS Publications Warehouse

    Jones, Brenda

    2011-01-01

    Regional Project Managers for the Charter are developed through training courses, which typically last between 3 and 5 days and are held in a central location for participants. These courses have resulted in increased activations and broader use of Charter data and information by local emergency management authorities. Project Managers are nominated according to either their regional affiliation or their specific areas of expertise. A normal activation takes 2 to 3 weeks to complete, with all related expenses the responsibility of the PM's home agency.

  18. A new comprehension and communication tool: a valuable resource for internationally educated occupational therapists.

    PubMed

    Nguyen, Tram; Baptiste, Sue; Jung, Bonny; Wilkins, Seanne

    2014-06-01

    The need was identified for a way to assess internationally educated occupational therapists’ skills in understanding and communicating professional terminology used in occupational therapy practice. The project aim was to develop and validate such a resource. A scenario-based assessment was developed using a three-phase process for tool development. The development process involved completion of a literature scan of professional terminology used in occupational therapy practice; selection of terms and concepts commonly used in occupational therapy practice; and, creation of practice-based scenarios illustrating key concepts complete with rating rubrics. An advisory group provided oversight, and a sample of internationally educated occupational therapists completed pilot and validity testing. The initial findings showed the assessment to be easy to complete and sensitive to testing understanding of the defined terms. The final outcome is an assessment tool that has broad application for occupational therapists wishing to enter professional practice in a new country. © 2013 Occupational Therapy Australia.

  19. CTUIR Grande Ronde River Basin Watershed Restoration Program McCoy Creek/McIntyre Creek Road Crossing, 1996-1998 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.

    1999-07-01

    This Annual Report provides a detailed overview of watershed restoration accomplishments achieved by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and project partners in the Upper Grande Ronde River Basin under contract with the Bonneville Power Administration (BPA) during the period July 1, 1997 through June 30, 1998. The Contract Agreement entitled McCoy Meadows Watershed Restoration Project (Project No.96-83-01) includes habitat restoration planning, design, and implementation in two project areas--the McCoy Meadows Ranch located in the Meadow, McCoy, and McIntyre Creek subbasins on private land and the Mainstem Grande Ronde River Habitat Enhancement Project located on private andmore » National Forest System lands near Bird Tract Springs along the Grande Ronde River. During the contract period, the CTUIR and partners (Mark and Lorna Tipperman, landowners), Oregon Department of Environmental Quality (ODEQ), U.S. Environmental Protection Agency (EPA), Oregon Department of Fish and Wildlife (ODFW), and Natural Resource Conservation Service (NRCS) initiated phase 1 construction of the McCoy Meadows Restoration Project. Phase 1 involved reintroduction of a segment of McCoy Creek from its existing channelized configuration into a historic meander channel. Project efforts included bioengineering and tree/shrub planting and protection, transporting salvaged cottonwood tree boles and limbs from offsite source to the project area for utilization by resident beaver populations for forage and dam construction materials, relocation of existing BPA/ODFW riparian corridor fencing to outer edges of meadow floodplain, establishment of pre-project photo points, and coordination of other monitoring and evaluation efforts being led by other project partners including groundwater monitoring wells, channel cross sections, water quality monitoring stations, juvenile population sampling index sites, redd surveys, and habitat surveys. Project activities also included coordination with the U.S. Forest Service, Wallowa-Whitman National Forest, LaGrande Ranger District (USFS) on the Forest Road 2137 (McIntyre Road) Relocation and Obliteration Project and the McCoy Creek crossing. The USFS completed engineering designs under the cooperative effort for the McCoy Creek crossing. Project activities accomplished on the Upper Mainstem Large Wood Addition Project included placement of approximately 120 whole trees to enhance instream structural diversity, pool habitat quality, streambank stability, and improved floodplain morphology. Project activities accomplished on the Mainstem Grande Ronde Habitat Enhancement Project included coordination with landowners (Shauna Musgrove of Cuhna Ranches, Dean Stone, and the Wallowa-Whitman National Forest, LaGrande Ranger District) to develop a habitat enhancement/restoration project opportunity along a 3 mile section of the mainstem Grande Ronde River and major tributaries including the lower reaches of Bear Creek and Jordan Creek. Upon securing an agreement with the landowners, project partners including the CTUIR, ODFW, NRCS, and USFS initiated development of project objectives and site-specific designs. By June 1998, project designs were completed and preparations nearly complete to initiate onsite project construction.« less

  20. Boom Time.

    ERIC Educational Resources Information Center

    Agron, Joe

    1998-01-01

    Examines building-cost trend data for educational facilities from the American School & University's 24th annual Official Education Construction Report for 1997. Data tables list education construction by projects completed; by projected spending; institution type; type of spending; projects projected for completion; and how construction costs…

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hobbs, R.E.

    In large facilities, successful energy management cannot be measured by a few projects, no matter how significant the energy savings. Large facilities today are comprised of extensive energy consuming systems. For every energy project developed, two more projects remain to be discovered. The successful energy manager is one who has completed ten projects, or twenty, or thirty, and is still finding more projects to do. Nothing is assumed to be as efficient as possible, and no part of any system is ignored. The successful energy manager is willing to take risks, not of being fired, but to use imagination, studymore » engineering theory, exercise common sense, develop concept designs, calculate savings, sell projects to management, control designers, study equipment performance, pre-select contractors, manage the contractor efforts, solve inherent problems along the way, and then optimize the project after acceptance when the designers and contractors all walk off. Once the successful energy manager establishes his credibility, his problem becomes finding enough time to get the projects rolling as he dreams them up. He sees what others do not. As they say in the North, only the lead dog sees new scenery.« less

  2. Device research task (processing and high-efficiency solar cells)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This task has been expanded since the last 25th Project Integration Meeting (PIM) to include process research in addition to device research. The objective of this task is to assist the Flat-plate Solar Array (FSA) Project in meeting its near- and long-term goals by identifying and implementing research in the areas of device physics, device structures, measurement techniques, material-device interactions, and cell processing. The research efforts of this task are described and reflect the deversity of device research being conducted. All of the contracts being reported are either completed or near completion and culminate the device research efforts of the FSA Project. Optimazation methods and silicon solar cell numerical models, carrier transport and recombination parameters in heavily doped silicon, development and analysis of silicon solar cells of near 20% efficiency, and SiN sub x passivation of silicon surfaces are discussed.

  3. Industry to Education Technology Transfer Program. Composite Materials--Personnel Development. Final Report.

    ERIC Educational Resources Information Center

    Tomezsko, Edward S. J.

    A composite materials education program was established to train Boeing Helicopter Company employees in the special processing of new filament-reinforced polymer composite materials. During the personnel development phase of the joint Boeing-Penn State University project, an engineering instructor from Penn State completed a 5-month, full-time…

  4. Self-Discovery and Professional Development.

    ERIC Educational Resources Information Center

    Margolin, Edythe

    This paper explores the role of self discovery in the early stages of caregiver professional development, with a focus on the array of choices available to university students. The assumption is that many people do not know their repertoire of skills until asked to complete a project requiring those skills; thus, "the heart of becoming a…

  5. Integrating Vocational Competencies and Math Skills. Industrial Education.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Instructional Materials Lab.

    This document is designed to help teachers identify those math skills that students must master to complete the vocational competencies taught in industrial education classes. Included in the document are 10 program area/math skills matrices that were developed as a result of a research development project during which secondary-level Missouri…

  6. Metis Hub: The Development of an Intuitive Project Planning System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, Rachael M.; Lawrence Livermore National Lab.

    2015-08-26

    The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.

  7. Practitioner Research as Part of Professional Development in Initial Teacher Education

    ERIC Educational Resources Information Center

    Maaranen, Katriina

    2009-01-01

    The purpose of this research is to seek the connection between professional development and an MA thesis research project, which is conducted as part of initial teacher education in Finland. This article examines the experiences of teachers with work experience, but without an official qualification, who recently completed their MA thesis. The…

  8. 24 CFR 92.504 - Participating jurisdiction responsibilities; written agreements; on-site inspection.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... housing owner, sponsor or developer (other than single-family owner-occupant)—(i) Use of the HOME funds... with § 92.353. (D) The labor requirements in § 92.354. (E) The conflict of interest provisions... completion of the project and ownership by the low-income family. (x) Community housing development...

  9. What Do Final Year Engineering Students Know about Sustainable Development?

    ERIC Educational Resources Information Center

    Nicolaou, I.; Conlon, E.

    2012-01-01

    This paper presents data from a project that aims to determine the level of knowledge and understanding of engineering students about sustainable development (SD). The data derive from a survey completed by final year engineering students in three Irish Higher Education Institutions. This paper is part of a larger study that examines the…

  10. The Multiple Challenges of Multimedia: Development, Implementation, and Evaluation.

    ERIC Educational Resources Information Center

    Kassen, Margaret Ann

    1998-01-01

    This article presents an overview of an ongoing initiative to develop, integrate, and evaluate multimedia lessons to enhance listening comprehension in Spanish language classes at the Catholic University of America (District of Columbia). Focusing on the process involved, the two phases of the project that have been completed are examined,…

  11. The Development of a Vocational Safety Guide for Missouri's Practitioners. Final Report.

    ERIC Educational Resources Information Center

    Dyrenfurth, Michael; Linhardt, Richard

    A project was conducted to develop a comprehensive vocational education safety guide for local administrators and teachers. To generate the guide, the following steps were completed: (1) a review of key related research, literature, and federal and state legislation, including vocational safety guides from 18 states; reference material from the…

  12. Whole-Grain Continuing Education for School Foodservice Personnel: Keeping Kids from Falling Short

    ERIC Educational Resources Information Center

    Roth-Yousey, Lori; Barno, Trina; Caskey, Mary; Asche, Kimberly; Reicks, Marla

    2009-01-01

    Objective: The purpose of this project was to develop and test whole-grain continuing education for school foodservice personnel. Methods: A continuing education program was developed to address planning, purchasing, preparing, and serving whole-grain food in schools. Participants completed a pre-post questionnaire to assess changes in knowledge,…

  13. Examining the ELL Professional Development Experiences of General Educators with English Language Learners: A Narrative Research Study Using Schon's Theory of the Reflective Practitioner

    ERIC Educational Resources Information Center

    Celozzi, Christopher L.

    2017-01-01

    This narrative research study explored how general education teachers describe their ELL professional development experiences. Specifically, this project revealed general educators' reflective practices in terms of how they translated completed professional development training into the learning environment of their own classrooms. The theoretical…

  14. Integrating Global Hydrology Into Graduate Engineering Education and Research

    NASA Astrophysics Data System (ADS)

    Griffis, V. W.

    2007-12-01

    Worldwide, polluted water affects the health of 1.2 billion people and contributes to the death of 15 million children under five every year. In addition poor environmental quality contributes to 25 per cent of all preventable ill health in the world. To address some of these problems, at the 2002 World Summit on Sustainable Development, the world community set the goal of halving, by the year 2015, the proportion of people without access to safe drinking water and basic sanitation. Solving sanitation and water resource management problems in any part of the world presents an interdisciplinary, complex challenge. However, when we attempt to solve these problems in an international context, our technical approaches must be tempered with cultural sensitivity and extraordinary management strategies. To meet this challenge, Michigan Tech has developed a unique global partnership with the U.S. Peace Corps to address our acknowledgement of the importance of placing engineering solutions in a global context. The program has graduated 30 students. Program enrollment is now over 30 and over 20 countries have hosted our students. The objective of this presentation is to demonstrate how this unique partnership can be integrated with graduate engineering education and research and also show how such a program may attract a more diverse student population into engineering. All graduate students enrolled in our Master's International Program in Civil and Environmental Engineering must complete specific coursework requirements before departing for their international experience. In CE5993 (Field Engineering in the Developing World) students learn to apply concepts of sustainable development and appropriate technology in the developing world. In FW5770 (Rural Community Development Planning and Analysis) students learn how one involves a community in the decision making process. A common theme in both courses is the role of woman in successful development projects. Technical specialization allows a student to take coursework in hydrology, water planning and management, and water quality engineering. The 2-3 semester residence on campus is then followed by three months of cultural, language, and technical training with the Peace Corps. After training students complete two years of service in the Peace Corps, typically working as a water/sanitation engineer while also completing a research project related to their Peace Corps experience. Some unique aspects of the Peace Corps experience is that it provides students with cultural awareness, language proficiency, community organizing skills, skills in consensus building and sustainable development, appreciation for technology that is economically and culturally sensitive, and a long-term field experience to develop an indepth overseas research project. Perhaps one of the greatest aspects of the Peace Corps experience is it provides students a basis to consider the social, economic, and environmental limitations of water projects in the developing world. Some examples of research projects that have been integrated into this program are: (a) culturally appropriate watershed planning and management, (b) technical capacity building of water supply systems, and (c) life cycle thinking approach applied to water and sanitation projects.

  15. Technology Development, Evaluation, and Application (TDEA) FY 1998 Progress Report Environment, Safety, and Health (ESH) Division

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larry G. Hoffman; Kenneth Alvar; Thomas Buhl

    1999-06-01

    This progress report presents the results of 10 projects funded ($504K) in FY98 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division. Nine projects are new for this year; two projects were completed in their third and final TDEA-funded year. As a result of their TDEA-funded projects, investigators have published 19 papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplemental funds and in-kind contributions, such as staff time, instrument use, and work space were also provided to the TDEA-funded projects by organizations external to ESHmore » Division. Products generated from the projects funded in FY98 included a new extremity dosimeter that replaced the previously used finger-ring dosimeters, a light and easy-to-use detector to measure energy deposited by neutron interactions, and a device that will allow workers to determine the severity of a hazard.« less

  16. Improving Diagnosis of Sepsis After Burn Injury Using a Portable Sepsis Alert System

    DTIC Science & Technology

    2016-10-01

    application listed milestones/target dates for important activities or phases of the project, identify these dates and show actual completion dates or the... activities ; 2) specific objectives; 3) significant results or key outcomes, including major findings, developments, or conclusions (both positive and...progresses to completion, the emphasis in reporting in this section should shift from reporting activities to reporting accomplishments. Task 1. Test the

  17. QUEST/Ada: Query utility environment for software testing of Ada

    NASA Technical Reports Server (NTRS)

    Brown, David B.

    1989-01-01

    Results of research and development efforts are presented for Task 1, Phase 2 of a general project entitled, The Development of a Program Analysis Environment for Ada. A prototype of the QUEST/Ada system was developed to collect data to determine the effectiveness of the rule-based testing paradigm. The prototype consists of five parts: the test data generator, the parser/scanner, the test coverage analyzer, a symbolic evaluator, and a data management facility, known as the Librarian. These components are discussed at length. Also presented is an experimental design for the evaluations, an overview of the project, and a schedule for its completion.

  18. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    PubMed

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  19. Refining Landsat classification results using digital terrain data

    USGS Publications Warehouse

    Miller, Wayne A.; Shasby, Mark

    1982-01-01

     Scientists at the U.S. Geological Survey's Earth Resources Observation systems (EROS) Data Center have recently completed two land-cover mapping projects in which digital terrain data were used to refine Landsat classification results. Digital ter rain data were incorporated into the Landsat classification process using two different procedures that required developing decision criteria either subjectively or quantitatively. The subjective procedure was used in a vegetation mapping project in Arizona, and the quantitative procedure was used in a forest-fuels mapping project in Montana. By incorporating digital terrain data into the Landsat classification process, more spatially accurate landcover maps were produced for both projects.

  20. Development of an Advanced Stimulation / Production Predictive Simulator for Enhanced Geothermal Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pritchett, John W.

    2015-04-15

    There are several well-known obstacles to the successful deployment of EGS projects on a commercial scale, of course. EGS projects are expected to be deeper, on the average, than conventional “natural” geothermal reservoirs, and drilling costs are already a formidable barrier to conventional geothermal projects. Unlike conventional resources (which frequently announce their presence with natural manifestations such as geysers, hot springs and fumaroles), EGS prospects are likely to appear fairly undistinguished from the earth surface. And, of course, the probable necessity of fabricating a subterranean fluid circulation network to mine the heat from the rock (instead of simply relying onmore » natural, pre-existing permeable fractures) adds a significant degree of uncertainty to the prospects for success. Accordingly, the basic motivation for the work presented herein was to try to develop a new set of tools that would be more suitable for this purpose. Several years ago, the Department of Energy’s Geothermal Technologies Office recognized this need and funded a cost-shared grant to our company (then SAIC, now Leidos) to partner with Geowatt AG of Zurich, Switzerland and undertake the development of a new reservoir simulator that would be more suitable for EGS forecasting than the existing tools. That project has now been completed and a new numerical geothermal reservoir simulator has been developed. It is named “HeatEx” (for “Heat Extraction”) and is almost completely new, although its methodology owes a great deal to other previous geothermal software development efforts, including Geowatt’s “HEX-S” code, the STAR and SPFRAC simulators developed here at SAIC/Leidos, the MINC approach originally developed at LBNL, and tracer analysis software originally formulated at INEL. Furthermore, the development effort was led by engineers with many years of experience in using reservoir simulation software to make meaningful forecasts for real geothermal projects, not just software designers. It is hoped that, as a result, HeatEx will prove useful during the early stages of the development of EGS technology. The basic objective was to design a tool that could use field data that are likely to become available during the early phases of an EGS project (that is, during initial reconnaissance and fracture stimulation operations) to guide forecasts of the longer-term behavior of the system during production and heat-mining.« less

  1. Thermoelectric Outer Planets Spacecraft (TOPS)

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The research and advanced development work is reported on a ballistic-mode, outer planet spacecraft using radioisotope thermoelectric generator (RTG) power. The Thermoelectric Outer Planet Spacecraft (TOPS) project was established to provide the advanced systems technology that would allow the realistic estimates of performance, cost, reliability, and scheduling that are required for an actual flight mission. A system design of the complete RTG-powered outer planet spacecraft was made; major technical innovations of certain hardware elements were designed, developed, and tested; and reliability and quality assurance concepts were developed for long-life requirements. At the conclusion of its active phase, the TOPS Project reached its principal objectives: a development and experience base was established for project definition, and for estimating cost, performance, and reliability; an understanding of system and subsystem capabilities for successful outer planets missions was achieved. The system design answered long-life requirements with massive redundancy, controlled by on-board analysis of spacecraft performance data.

  2. Automated Methodologies for the Design of Flow Diagrams for Development and Maintenance Activities

    NASA Astrophysics Data System (ADS)

    Shivanand M., Handigund; Shweta, Bhat

    The Software Requirements Specification (SRS) of the organization is a text document prepared by strategic management incorporating the requirements of the organization. These requirements of ongoing business/ project development process involve the software tools, the hardware devices, the manual procedures, the application programs and the communication commands. These components are appropriately ordered for achieving the mission of the concerned process both in the project development and the ongoing business processes, in different flow diagrams viz. activity chart, workflow diagram, activity diagram, component diagram and deployment diagram. This paper proposes two generic, automatic methodologies for the design of various flow diagrams of (i) project development activities, (ii) ongoing business process. The methodologies also resolve the ensuing deadlocks in the flow diagrams and determine the critical paths for the activity chart. Though both methodologies are independent, each complements other in authenticating its correctness and completeness.

  3. Sounds Clear Enough

    NASA Technical Reports Server (NTRS)

    Zak, Alan

    2004-01-01

    I'm a vice president at Line6, where we produce electronics for musical instruments. My company recently developed a guitar that can be programmed to sound like twenty-five different classic guitars - everything from a 1928 National 'Tricone' to a 1970 Martin. It is quite an amazing piece of technology. The guitar started as a research project because we needed to know if the technology was going to be viable and if the guitar design was going to be practical. I've been in this business for about twenty years now, and I still enjoy starting up projects whenever the opportunity presents itself. During the research phase, I headed up the project myself. Once we completed our preliminary research and made the decision to move into development, that's when I handed the project off - and that's where this story really begins.

  4. Is there a place for nutrition-sensitive agriculture?

    PubMed

    Wambugu, Florence; Obukosia, Silas; Gaffney, Jim; Kamanga, Daniel; Che, Ping; Albertsen, Marc C; Zhao, Zuo-Yu; Ragland, Lonnetta; Yeye, Mary; Kimani, Esther; Aba, Daniel; Gidado, Rose; Solomon, B O; Njuguna, Michael

    2015-11-01

    The focus of the review paper is to discuss how biotechnological innovations are opening new frontiers to mitigate nutrition in key agricultural crops with potential for large-scale health impact to people in Africa. The general objective of the Africa Biofortified Sorghum (ABS) project is to develop and deploy sorghum with enhanced pro-vitamin A to farmers and end-users in Africa to alleviate vitamin A-related micronutrient deficiency diseases. To achieve this objective the project technology development team has developed several promising high pro-vitamin A sorghum events. ABS 203 events are so far the most advanced and well-characterised lead events with about 12 μg β-carotene/g tissue which would supply about 40-50 % of the daily recommended vitamin A at harvest. Through gene expression optimisation other events with higher amounts of pro-vitamin A, including ABS 214, ABS 235, ABS 239 with 25, 30-40, 40-50 μg β-carotene/g tissue, respectively, have been developed. ABS 239 would provide twice recommended pro-vitamin A at harvest, 50-90 % after 3 months storage and 13-45 % after 6 months storage for children. Preliminary results of introgression of ABS pro-vitamin A traits into local sorghum varieties in target countries Nigeria and Kenya show stable introgression of ABS vitamin A into local farmer-preferred sorghums varieties. ABS gene Intellectual Property Rights and Freedom to Operate have been donated for use royalty free for Africa. Prior to the focus on the current target countries, the project was implemented by fourteen institutions in Africa and the USA. For the next 5 years, the project will complete ABS product development, complete regulatory science data package and apply for product deregulation in target African countries.

  5. APPLIED MERCURY CAPTURE

    EPA Science Inventory

    The first purpose of this project is to complete bench and pilot scale testing of promising mercury sorbents. This work would apply findings from fundamental, mechanistic efforts over the past three years that have developed sorbents which show improved capture of elemental and ...

  6. Demonstrating a Total Transit Solution for Fuel Cell Electric Buses in Boston

    DOT National Transportation Integrated Search

    2017-05-01

    The Federal Transit Administrations (FTA) National Fuel Cell Bus Program (NFCBP) focuses on developing commercially viable fuel cell bus technologies. Nuvera is leading the Massachusetts Fuel Cell Bus project to demonstrate a complete transit solu...

  7. 7 CFR 3403.6 - Content of proposals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... development of a project based on previously completed research, will not be accepted. Literature surveys... Agriculture Regulations of the Department of Agriculture (Continued) COOPERATIVE STATE RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE SMALL BUSINESS INNOVATION RESEARCH GRANTS PROGRAM...

  8. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... include performing a needs assessment, completing and/or verifying master plans, developing justification... environmental, archeological, cultural resource, historic preservation, and conduct of similar assessments. (d...; programmatic needs; and, for facilities projects, a detailed room-by-room listing of spaces, including net and...

  9. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... include performing a needs assessment, completing and/or verifying master plans, developing justification... environmental, archeological, cultural resource, historic preservation, and conduct of similar assessments. (d...; programmatic needs; and, for facilities projects, a detailed room-by-room listing of spaces, including net and...

  10. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... include performing a needs assessment, completing and/or verifying master plans, developing justification... environmental, archeological, cultural resource, historic preservation, and conduct of similar assessments. (d...; programmatic needs; and, for facilities projects, a detailed room-by-room listing of spaces, including net and...

  11. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... include performing a needs assessment, completing and/or verifying master plans, developing justification... environmental, archeological, cultural resource, historic preservation, and conduct of similar assessments. (d...; programmatic needs; and, for facilities projects, a detailed room-by-room listing of spaces, including net and...

  12. Logistics Reduction and Repurposing Technology for Long Duration Space Missions

    NASA Technical Reports Server (NTRS)

    Broyan, James L.; Chu, Andrew; Ewert, Michael K.

    2014-01-01

    One of NASA's Advanced Exploration Systems (AES) projects is the Logistics Reduction and Repurposing (LRR) project, which has the goal of reducing logistics resupply items through direct and indirect means. Various technologies under development in the project will reduce the launch mass of consumables and their packaging, enable reuse and repurposing of items and make logistics tracking more efficient. Repurposing also reduces the trash burden onboard spacecraft and indirectly reduces launch mass by replacing some items on the manifest. Examples include reuse of trash as radiation shielding or propellant. This paper provides the status of the LRR technologies in their third year of development under AES. Advanced clothing systems (ACS) are being developed to enable clothing to be worn longer, directly reducing launch mass. ACS has completed a ground exercise clothing study in preparation for an International Space Station (ISS) technology demonstration in 2014. Development of launch packaging containers and other items that can be repurposed on-orbit as part of habitation outfitting has resulted in a logistics-to-living (L2L) concept. L2L has fabricated and evaluated several multi-purpose cargo transfer bags (MCTBs) for potential reuse on orbit. Autonomous logistics management (ALM) is using radio frequency identification (RFID) to track items and thus reduce crew requirements for logistics functions. An RFID dense reader prototype is under construction and plans for integrated testing are being made. Development of a heat melt compactor (HMC) second generation unit for processing trash into compact and stable tiles is nearing completion. The HMC prototype compaction chamber has been completed and system development testing is underway. Research has been conducted on the conversion of trash-to-gas (TtG) for high levels of volume reduction and for use in propulsion systems. A steam reformation system was selected for further system definition of the TtG technology. And benefits analysis of all LRR technologies have been updated with the latest test and analysis results.

  13. QUEST/Ada (query utility environment for software testing of Ada: The development of a program analysis environment for Ada, task 1, phase 3

    NASA Technical Reports Server (NTRS)

    Brown, David B.

    1991-01-01

    The results of research and development efforts of the first six months of Task 1, Phase 3 of the project are presented. The goals of Phase 3 are: (1) to further refine the rule base and complete the comparative rule base evaluation; (2) to implement and evaluate a concurrency testing prototype; (3) to convert the complete (unit-level and concurrency) testing prototype to a workstation environment; and (4) to provide a prototype development document to facilitate the transfer of research technology to a working environment. These goals were partially met and the results are summarized.

  14. Barriers and facilitators for integrating digital narratives in secondary school science instruction: A media specialist's action research study

    NASA Astrophysics Data System (ADS)

    Midland, Susan

    Media specialists are increasingly assuming professional development roles as they collaborate with teachers to design instruction that combines content with technology. I am a media specialist in an independent school, and collaborated with two science teachers over a three-year period to integrate technology with their instruction. This action study explored integration of a digital narrative project in three eighth-grade earth science units and one ninth-grade physics unit with each unit serving as a cycle of research. Students produced short digital documentaries that combined still images with an accompanying narration. Students participating in the project wrote scripts based on selected science topics. The completed scripts served as the basis for the narratives. These projects were compared with a more traditional science writing project. Barriers and facilitators for implementation of this type of media project in a science classroom were identified. Lack of adequate access to computers proved to be a significant mechanical barrier. Acquisition of a laptop cart reduced but did not eliminate the technology access issues. The complexity of the project increased implementation time in comparison with traditional alternatives. Evaluation of the completed media projects presented problems. Scores by outside evaluators reflected evaluator unfamiliarity with assessing multimedia projects rather than student performance. Despite several revisions of the assessment rubric, low inter-rater reliability remained a concern even in the last cycle. This suggests that evaluation of media could present issues for teachers who attempt projects of this kind. A writing frame was developed to facilitate production of scripts. This reduced the time required to produce the scripts, but produced writing that was formulaic in the teacher's estimate. A graphic organizer was adopted in the final cycle to address this concern. New insights emerged as the study progressed through the four cycles of the study. At the conclusion of the study, the two teachers and I had a better understanding of barriers that can prevent smooth integration of a technology-based project.

  15. A Novel Approach to Practice-Based Learning and Improvement Using a Web-Based Audit and Feedback Module

    PubMed Central

    Boggan, Joel C.; Cheely, George; Shah, Bimal R.; Heffelfinger, Randy; Springall, Deanna; Thomas, Samantha M.; Zaas, Aimee; Bae, Jonathan

    2014-01-01

    Background Systematically engaging residents in large programs in quality improvement (QI) is challenging. Objective To coordinate a shared QI project in a large residency program using an online tool. Methods A web-based QI tool guided residents through a 2-phase evaluation of performance of foot examinations in patients with diabetes. In phase 1, residents completed reviews of health records with online data entry. Residents were then presented with personal performance data relative to peers and were prompted to develop improvement plans. In phase 2, residents again reviewed personal performance. Rates of performance were compared at the program and clinic levels for each phase, with data presented for residents. Acceptability was measured by the number of residents completing each phase. Feasibility was measured by estimated faculty, programmer, and administrator time and costs. Results Seventy-nine of 86 eligible residents (92%) completed improvement plans and reviewed 1471 patients in phase 1, whereas 68 residents (79%) reviewed 1054 patient charts in phase 2. Rates of performance of examination increased significantly between phases (from 52% to 73% for complete examination, P < .001). Development of the tool required 130 hours of programmer time. Project analysis and management required 6 hours of administrator and faculty time monthly. Conclusions An online tool developed and implemented for program-wide QI initiatives successfully engaged residents to participate in QI activities. Residents using this tool demonstrated improvement in a selected quality target. This tool could be adapted by other graduate medical education programs or for faculty development. PMID:26279782

  16. 15 CFR 2301.24 - Final Federal payment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... reasonable costs incurred in completing the planning or construction project are less than the total project..., however, the actual costs incurred in completing the project are more than the estimated total project costs, in no case will the final Federal funds paid exceed the grant award. ...

  17. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2001-2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vaivoda, Alexis

    2003-11-01

    This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fishmore » Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. OBJECTIVE 3--Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02 the final engineering was completed on this project. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. Project completion is expected in July 2003. OBJECTIVE 4--Assist the Farmers Irrigation District (FID) in construction and installation of a new fish screen and bypass system on the mainstem Hood River (Farmers Canal). Final engineering and design for the horizontal screen was completed during the winter of 2001. In December 2001 and January 2002, the concrete work was completed and the head gates were mounted. During the spring the secondary head level control gates were installed. In September 2002, the jersey barriers and vortex tubes were installed. These are located upstream of the old drum screen, and are the primary means of dealing with bedload and suspended load from the diversion. The screen surface was also installed in September 2002 and the system accommodated water soon after. Monitoring of these structures in regards to efficiency and possible effects to fish migration is scheduled to occur in spring 2003. The transition from the old canal to the new screen is smooth and currently does not present any problems. The old drum screen is going to remain in place until all the biological and hydrological monitoring is complete to ensure compliance and satisfaction of all agencies involved. OBJECTIVE 5--Assist the East Fork Irrigation District (EFID) in final engineering design and construction of the Central Lateral Canal upgrade and invert siphon. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02, a significant portion of the engineering and design work was completed on the EFID Central Lateral Canal upgrade and invert siphon. There were some changes in canal alignment that required further design work and easement acquisition. Time was also spent looking for matching funds and securing a loan by the EFID. Construction initiation is now scheduled for summer 2003. OBJECTIVE 6--Modify and/or eliminate five culverts, three on Baldwin Creek, one on Graham Creek, and one on Evans Creek, which function as barriers to upstream and downstream fish migration. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. There are only two culverts on Baldwin Creek that will be eliminated or modified. Work was initiated on the removal of one of these culverts, and the replacement of the other. The landowner was agreeable and NEPA was initiated. The modification/elimination of these culverts is scheduled for FY 04. The culvert on Graham Creek is a county road, and will be addressed as a fish passage barrier by Hood River County. The Evans Creek culvert was prepared for modification in FY 02, however due to a lengthy permitting process the instream work period was missed. This project is on the schedule for the instream work period of 2003. OBJECTIVE 7--Construct riparian fence to stabilize and improve the riparian zone along the East Fork Hood River and tributaries. Two riparian fencing projects were completed on East Fork Hood River tributaries. The first was on Baldwin Creek, and the second was on Shelly Creek.« less

  18. Challenges to achieving sustainable community health development within a donor aid business model.

    PubMed

    Ashwell, Helen; Barclay, Lesley

    2010-06-01

    This paper explores the paradox of donor aid being delivered through a business model through a case study in Papua New Guinea. A retrospective review of project implementation and an outcome evaluation provided an opportunity to examine the long-term results and sustainability of a large project. Analysis was informed by data collected from 175 interviews (national, provincial, district and village), 93 community discussions and observations across 10 provinces. Problems with the business model of delivering aid were evident from implementation data and in an evaluation conducted two years after project completion (2006). Compounding the business model effect were challenges of over-ambitious project goals with limited flexibility to adapt to changing circumstances, a donor payment system requiring short-term productivity and excessive reporting requirements. An overly ambitious project design, donor dominance within the business model and limited local counterpart capacity created problems in the community initiatives component of the project. Contractual pressures can negatively influence long-term outcomes that require development of local leadership and capacity. Future planning for donor project designs needs to be flexible, smaller in scope and have a longer timeframe of seven to 10 years. Donor-funded projects need to be sufficiently flexible to apply proven principles of community development, build local ownership and allow adequate time to build counterpart knowledge and skills.

  19. Monitoring the Mesoamerican Biological Corridor: A NASA/CCAD Cooperative Research Project

    NASA Technical Reports Server (NTRS)

    Sever, Thomas; Irwin, Daniel; Sader, Steven A.; Saatchi, Sassan

    2004-01-01

    To foster scientific cooperation under a Memorandum of Understanding between NASA and the Central American countries, the research project developed regional databases to monitor forest condition and environmental change throughout the region. Of particular interest is the Mesoamerican Biological Corridor (MBC), a chain of protected areas and proposed conservation areas that will link segments of natural habitats in Central America from the borders of northern Columbia to southern Mexico. The first and second year of the project focused on the development of regional satellite databases (JERS-IC, MODIS, and Landsat-TM), training of Central American cooperators and forest cover and change analysis. The three regional satellite mosaics were developed and distributed on CD-ROM to cooperators and regional outlets. Four regional remote sensing training courses were conducted in 3 countries including participants from all 7 Central American countries and Mexico. In year 3, regional forest change assessment in reference to Mesoamerican Biological Corridor was completed and land cover maps (from Landsat TM) were developed for 7 Landsat scenes and accuracy assessed. These maps are being used to support validation of MODIS forest/non forest maps and to examine forest fragmentation and forest cover change in selected study sites. A no-cost time extension (2003-2004) allowed the completion of an M.S. thesis by a Costa Rican student and preparation of manuscripts for future submission to peer-reviewed outlets. Proposals initiated at the end of the project have generated external funding from the U.S. Forest Service (to U. Maine), NASA-ESSF (Oregon State U.) and from USAID and EPA (to NASA-MSFC-GHCC) to test MODIS capabilities to detect forest change; conduct literature review on biomass estimation and carbon stocks and develop a regional remote sensing monitoring center in Central America. The success of the project has led to continued cooperation between NASA, other federal agencies, and scientists from all seven Central American Countries (see SERVIR web site for this ongoing work - servir.nsstc.nasa.gov).

  20. Research and partnerships with schools.

    PubMed

    Svirydzenka, Nadzeya; Aitken, Jill; Dogra, Nisha

    2016-08-01

    Despite the quantity of research on child and adolescent mental health being done in schools, little output has focused on the practical aspects of recruiting schools and students into a study. Furthermore, there is limited knowledge on how to develop and sustain productive and mutually beneficial partnerships with schools after the project finishes. A large study examining prevalence of mental health problems in young people involving nine schools is used as an example for the procedure of recruitment and carrying out a research project, while developing and sustaining partnerships with schools. While recruiting the schools, a three-stage model was developed that corresponded closely to the school's needs and existing demands. The suggested procedure for the study, thus, closely reflected the varying existing cultures of participating schools. Partnerships, developed as a result of the project, were used in developing further projects and interventions for promoting good mental health in schools. Rather than a blanket research recruitment and procedural approach with an end to school involvement at the end of the project, the paper advocates for a deeper understanding of the schools' internal culture for improved recruitment and study outcomes. Developed partnerships, when sustained past the completion of research, prove to be a useful tool in applying the findings in promoting good mental health in schools and continuing research further.

  1. Agua Caliente Solar Feasibility and Pre-Development Study Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carolyn T. Stewart, Managing Partner; Red Mountain Energy Partners

    2011-04-26

    Evaluation of facility- and commercial-scale solar energy projects on the Agua Caliente Band of Cahuilla Indians Reservation in Palm Springs, CA. The Agua Caliente Band of Cahuilla Indians (ACBCI) conducted a feasibility and pre-development study of potential solar projects on its lands in southern California. As described below, this study as a logical and necessary next step for ACBCI. Support for solar project development in California, provided through the statewide California Solar Initiative (CSI), its Renewable Portfolio Standard and Feed-in Tariff Program, and recently announced Reverse Auction Mechanism, provide unprecedented support and incentives that can be utilized by customers ofmore » California's investor-owned utilities. Department of Energy (DOE) Tribal Energy Program funding allowed ACBCI to complete its next logical step to implement its Strategic Energy Plan, consistent with its energy and sustainability goals.« less

  2. Development of a Thin-Wall Magnesium side door Inner Panel for Automobiles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jekl, J.; Auld, J.; Sweet, C.

    Cast magnesium side door inner panels can provide a good combination of weight, functional, manufacturing and economical requirements. However, several challenges exist including casting technology for thin-wall part design, multi-material incompatibility and relatively low strength vs steel. A project has been initiated, supported by the US Department of Energy, to design and develop a lightweight frame-under-glass door having a thin-wall, full die-cast, magnesium inner panel. This development project is the first of its kind within North America. Phase I of the project is now complete and the 2.0mm magnesium design, through casting process enablers, has met or exceeded all stiffnessmore » requirements, with significant mass reduction and part consolidation. In addition, a corrosion mitigation strategy has been established using industry-accepted galvanic isolation methods and coating technologies.« less

  3. The CELSS breadboard project: Plant production

    NASA Technical Reports Server (NTRS)

    Knott, William M.

    1990-01-01

    NASA's Breadboard Project for the Controlled Ecological Life Support System (CELSS) program is described. The simplified schematic of a CELSS is given. A modular approach is taken to building the CELSS Breadboard. Each module is researched in order to develop a data set for each one prior to its integration into the complete system. The data being obtained from the Biomass Production Module or the Biomass Production Chamber is examined. The other primary modules, food processing and resource recovery or waste management, are discussed briefly. The crew habitat module is not discussed. The primary goal of the Breadboard Project is to scale-up research data to an integrated system capable of supporting one person in order to establish feasibility for the development and operation of a CELSS. Breadboard is NASA's first attempt at developing a large scale CELSS.

  4. Commercialization of Medium Voltage HTS Triax TM Cable Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, David

    2012-12-31

    The original project scope that was established in 2007 aimed to install a 1,700 meter (1.1 mile) medium voltage HTS Triax{TM} cable system into the utility grid in New Orleans, LA. In 2010, however, the utility partner withdrew from the project, so the 1,700 meter cable installation was cancelled and the scope of work was reduced. The work then concentrated on the specific barriers to commercialization of HTS cable technology. The modified scope included long-length HTS cable design and testing, high voltage factory test development, optimized cooling system development, and HTS cable life-cycle analysis. In 2012, Southwire again analyzed themore » market for HTS cables and deemed the near term market acceptance to be low. The scope of work was further reduced to the completion of tasks already started and to testing of the existing HTS cable system in Columbus, OH. The work completed under the project included: • Long-length cable modeling and analysis • HTS wire evaluation and testing • Cable testing for AC losses • Optimized cooling system design • Life cycle testing of the HTS cable in Columbus, OH • Project management. The 200 meter long HTS Triax{TM} cable in Columbus, OH was incorporated into the project under the initial scope changes as a test bed for life cycle testing as well as the site for an optimized HTS cable cooling system. The Columbus cable utilizes the HTS TriaxTM design, so it provided an economical tool for these of the project tasks.« less

  5. BUILDING MATERIALS RECLAMATION PROGRAM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. Weggel; Shen-En Chen; Helene Hilger

    2010-08-31

    This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisorymore » panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.« less

  6. Jumping to New Heights: Horsemanship Activities. Level 5. 4-H Skills for Life Animal Series. National 4-H Curriculum. BU-08057

    ERIC Educational Resources Information Center

    Neiberger-Miller, Ami

    2004-01-01

    This is the fifth in a series of five horse project activity guides for youth. Levels 1-3 focus on "horse-less" activities, while Levels 4 and 5 zero in on riding and horsemanship. Each guide has an achievement program to encourage youth to learn and develop life skills. The assistance of a horse project helper in completing the achievement…

  7. Stable Relationships: Horse Care Activities. Level 3. 4-H Skills for Life Animal Series. National 4-H Curriculum. BU-08055

    ERIC Educational Resources Information Center

    Neiberger-Miller, Ami

    2004-01-01

    This is the third in a series of five horse project activity guides for youth. Levels 1-3 focus on "horse-less" activities, while Levels 4 and 5 zero in on riding and horsemanship. Each guide has an achievement program to encourage youth to learn and develop life skills. The assistance of a horse project helper in completing the achievement…

  8. The Use of Open Source Software in the Global Land Ice Measurements From Space (GLIMS) Project, and the Relevance to Institutional Cooperation

    Treesearch

    Christopher W. Helm

    2006-01-01

    GLIMS is a NASA funded project that utilizes Open-Source Software to achieve its goal of creating a globally complete inventory of glaciers. The participation of many international institutions and the development of on-line mapping applications to provide access to glacial data have both been enhanced by Open-Source GIS capabilities and play a crucial role in the...

  9. Head, Heart, & Hooves: Horse Raising Activities. Level 2. 4-H Skills for Life Animal Series. National 4-H Curriculum. BU-08054

    ERIC Educational Resources Information Center

    Neiberger-Miller, Ami

    2004-01-01

    This is the second in a series of five horse project activity guides for youth. Levels 1-3 focus on "horse-less" activities, while Levels 4 and 5 zero in on riding and horsemanship. Each guide has an achievement program to encourage youth to learn and develop life skills. The assistance of a horse project helper in completing the achievement…

  10. Riding the Range: Horse Riding Activities. Level 4. 4-H Skills for Life Animal Series. National 4-H Curriculum. BU-08056

    ERIC Educational Resources Information Center

    Neiberger-Miller, Ami

    2004-01-01

    This is the fourth in a series of five horse project activity guides for youth. Levels 1-3 focus on "horse-less" activities, while Levels 4 and 5 zero in on riding and horsemanship. Each guide has an achievement program to encourage youth to learn and develop life skills. The assistance of a horse project helper in completing the achievement…

  11. Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Technology Development Overview

    NASA Technical Reports Server (NTRS)

    Hughes, Stephen J.; Cheatwood, F. McNeil; Calomino, Anthony M.; Wright, Henry S.; Wusk, Mary E.; Hughes, Monica F.

    2013-01-01

    The successful flight of the Inflatable Reentry Vehicle Experiment (IRVE)-3 has further demonstrated the potential value of Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This technology development effort is funded by NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). This paper provides an overview of a multi-year HIAD technology development effort, detailing the projects completed to date and the additional testing planned for the future.

  12. Celebration of the International Year of Planet Earth in Canada: A Work in Progress

    NASA Astrophysics Data System (ADS)

    Nowlan, G. S.; Boyd, J. D.; Reimer, J.

    2009-05-01

    The International Year of Planet Earth (IYPE, 2007-2009) has been the inspiration for a variety of projects across Canada. Local events, including speaker series and educational programs in Earth sciences have taken place in several parts of the country in 2008-09. Most Canadian conferences for Earth scientists have developed programs reflecting IYPE in 2008 and 2009. The Walcott Conference, celebrating the 100th anniversary of the discovery of the Burgess Shale fauna, to be held in Banff in August 2009 has sponsorship from IYPE. All these projects have served to raise the local and national profile of IYPE and provide learning opportunities for many Canadians. The Canadian National Committee for IYPE developed the theme WHERE, which is an acronym for Water, Hazards, Energy, Resources and Environment. The tag line is Where on Earth? Where in Canada? Proposals for projects were sought nationally for projects that would leave a legacy following the completion of IYPE. The initial proposals were recast into a program of consolidated projects and funds were sought to support them, mainly from the private sector. Already completed are 32 fact sheets on mineral and energy resources and a poster on the resources required to build and run a snowmobile. There are several projects in various states of completion at the time of writing: these are showcased at www.EarthSciencesCanada.com and are intended to form a legacy that will last for years to come. Other projects were funded directly by local agencies to celebrate IYPE; an example is new signage in Alberta Provincial Parks funded by the Alberta Geological Survey. The WHERE Challenge asks Canadians aged 10-14 to answer two simple questions: What on Earth is in your stuff and where on Earth does it come from? Thousands of students are expected to enter this contest by the end of February by telling a story about the Earth resources required to build everyday objects. The story can be told in any medium and the more creative it is the better. Entries will be judged in each of seven regions and then the regional winners will be considered for three national prizes. The prizes will be awarded on Earth Day in April 2009. Another project nearing completion is the Earth Science Careers Web Site that is a comprehensive, interactive and animated web site providing critical information to Canadian youth about the many and varied careers that are possible within Earth science. We hope that this will spark interest in Earth science careers among a wide spectrum of Canadian youth. A book entitled Four Billion Years and Counting: Canada's Geological Heritage is under preparation and should be published by the end of 2009. It will feature many beautiful photographs, hundreds of new illustrations and text that describes Earth processes, the evolution of Canada in time-slices and the social impact of Earth sciences in the country. It is being developed as a grassroots project with the latest science provided by experts and developed into reader-friendly text by teams of reviewers and the editors. The illustrations will be available on-line for free download after the book has been published. All of these products will be passed on for continuing support to the Canadian Federation of Earth Sciences at the end of 2009.

  13. Development of Virtual Airspace Simulation Technology - Real-Time (VAST-RT) Capability 2 and Experimental Plans

    NASA Technical Reports Server (NTRS)

    Lehmer, R.; Ingram, C.; Jovic, S.; Alderete, J.; Brown, D.; Carpenter, D.; LaForce, S.; Panda, R.; Walker, J.; Chaplin, P.; hide

    2006-01-01

    The Virtual Airspace Simulation Technology - Real-Time (VAST-RT) Project, an element cf NASA's Virtual Airspace Modeling and Simulation (VAMS) Project, has been developing a distributed simulation capability that supports an extensible and expandable real-time, human-in-the-loop airspace simulation environment. The VAST-RT system architecture is based on DoD High Level Architecture (HLA) and the VAST-RT HLA Toolbox, a common interface implementation that incorporates a number of novel design features. The scope of the initial VAST-RT integration activity (Capability 1) included the high-fidelity human-in-the-loop simulation facilities located at NASA/Ames Research Center and medium fidelity pseudo-piloted target generators, such as the Airspace Traffic Generator (ATG) being developed as part of VAST-RT, as well as other real-time tools. This capability has been demonstrated in a gate-to-gate simulation. VAST-RT's (Capability 2A) has been recently completed, and this paper will discuss the improved integration of the real-time assets into VAST-RT, including the development of tools to integrate data collected across the simulation environment into a single data set for the researcher. Current plans for the completion of the VAST-RT distributed simulation environment (Capability 2B) and its use to evaluate future airspace capacity enhancing concepts being developed by VAMS will be discussed. Additionally, the simulation environment's application to other airspace and airport research projects is addressed.

  14. The Impact of the Project K Youth Development Program on Self-Efficacy: A Randomized Controlled Trial.

    PubMed

    Deane, Kelsey L; Harré, Niki; Moore, Julie; Courtney, Matthew G R

    2017-03-01

    A key issue for youth development programs is whether the learning they provide is transferred to participants' daily lives. It is also important that they are effective for the diverse range of participants they attract. This study used a randomized controlled trial design to measure the impact of Project K, a New Zealand-based youth development program, on academic and social self-efficacy. Project K combines a 3-week wilderness adventure, a 10 day community service component, and 1 year of mentoring to promote positive growth in 14-15 year olds with low self-efficacy. At baseline, the evaluation included 600 Project K (46 % female) and 577 Control participants (48 % female) and revealed that Project K was effective in improving both social and academic self-efficacy from pre- to post-program with effects being sustained 1 year later. Parents' perceptions of changes in the participants' interpersonal skills supported these findings. Differential program effects were found across participant subgroups, particularly 1 year after program completion. The implications of these differences are discussed.

  15. Longitudinal impact of the project PATHS on adolescent risk behavior: what happened after five years?

    PubMed

    Shek, Daniel T L; Yu, Lu

    2012-01-01

    The present study investigated the longitudinal impact of the Project PATHS, a large-scale curriculum-based positive youth development program in Hong Kong, on the development of adolescents' risk behavior over a period of five years. Using a longitudinal randomized controlled design, eight waves of data were collected from 19 experimental schools in which students participated in the Project PATHS (N = 2,850 at Wave 8) and 24 control schools without joining the Project PATHS (N = 3,640 at Wave 8). At each wave, students responded to measures assessing their current risk behaviors, including delinquency, use of different types of drug, and their intentions of participating in risk behaviors in the future. Results demonstrated that adolescents receiving the program exhibited significantly slower increases in delinquent behaviors and substance use as compared to the control participants. During two years after the completion of the program, differences in youth risk behaviors in the two groups still existed. These results suggest that the Project PATHS has long-term effect in preventing adolescent problem behavior through promoting positive youth development.

  16. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  17. CoMET: Cost and Mass Evaluation Tool for Spacecraft and Mission Design

    NASA Technical Reports Server (NTRS)

    Bieber, Ben S.

    2005-01-01

    New technology in space exploration is often developed without a complete knowledge of its impact. While the immediate benefits of a new technology are obvious, it is harder to understand its indirect consequences, which ripple through the entire system. COMET is a technology evaluation tool designed to illuminate how specific technology choices affect a mission at each system level. COMET uses simplified models for mass, power, and cost to analyze performance parameters of technologies of interest. The sensitivity analysis that CoMET provides shows whether developing a certain technology will greatly benefit the project or not. CoMET is an ongoing project approaching a web-based implementation phase. This year, development focused on the models for planetary daughter craft, such as atmospheric probes, blimps and balloons, and landers. These models are developed through research into historical data, well established rules of thumb, and engineering judgment of experts at JPL. The model is validated by corroboration with JpL advanced mission studies. Other enhancements to COMET include adding launch vehicle analysis and integrating an updated cost model. When completed, COMET will allow technological development to be focused on areas that will most drastically improve spacecraft performance.

  18. ExMC Technology Watch

    NASA Technical Reports Server (NTRS)

    Krihak, M.; Watkins, S.; Fung, Paul P.

    2013-01-01

    The Technology Watch (Tech Watch) project is a NASA project that is operated under the Human Research Programs (HRP) Exploration Medical Capability (ExMC) element, and focuses on ExMC technology gaps. The project coordinates the efforts of several NASA centers, including the Johnson Space Center (JSC), Glenn Research Center (GRC), Ames Research Center (ARC), and the Langley Research Center (LaRC). The objective of Tech Watch is to identify emerging, high-impact technologies that augment current NASA HRP technology development efforts. Identifying such technologies accelerates the development of medical care and research capabilities for the mitigation of potential health issues encountered during human space exploration missions. The aim of this process is to leverage technologies developed by academia, industry and other government agencies and to identify the effective utilization of NASA resources to maximize the HRP return on investment. The establishment of collaborations with these entities is beneficial to technology development, assessment and/or insertion and further NASAs goal to provide a safe and healthy environment for human exploration. In 2012, the Tech Watch project expanded the scope of activities to cultivate student projects targeted at specific ExMC gaps, generate gap reports for a majority of the ExMC gaps and maturate a gap report review process to optimize the technical and managerial aspects of ExMC gap status. Through numerous site visits and discussions with academia faculty, several student projects were initiated and/or completed this past year. A key element to these student projects was the ability of the project to align with a specific ExMC technology or knowledge gap. These projects were mentored and reviewed by Tech Watch leads at the various NASA centers. Another result of the past years efforts was the population of the ExMC wiki website that now contains more the three quarters of the ExMC gap reports. The remaining gap reports will be completed in FY13. Finally, the gap report review process for all ExMC gaps was initiated. This review process was instrumental in ensuring that each gap report was thoroughly reviewed for accuracy and relevant content prior to its public release. In the upcoming year, the gap report review process will be refined such that in addition to the gap report update, programmatic information related to gap closure will also be emphasized.

  19. DEVELOPMENT OF AN INSPECTION PLATFORM AND A SUITE OF SENSORS FOR ASSESSING CORROSION AND MECHANICAL DAMAGE ON UNPIGGABLE TRANSMISSION MAINS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George C. Vradis

    2003-07-01

    This development program is a joint effort among the Northeast Gas Association (formerly New York Gas Group), Foster-Miller, Inc., and the US Department of Energy (DOE) through the National Energy Technology Laboratory (NETL). The DOE's contribution to this project is $572,525 out of a total of $772,525. The present report summarizes the accomplishments of the project during its third three-month period (from April 2003 through June 2003). The project was initiated with delay in February 2003 due to contractual issues that emerged between NGA and Foster-Miller, Inc. The two organizations are working diligently to maintain the program's pace and expectmore » to complete it in time. The efforts of the project focused during this period in finalizing the assessment of the tether technology, which is intended to be used as the means of communication between robot and operator. Results indicate that the tether is a viable option under certain pipeline operating conditions, but not all. Concerns also exist regarding the abrasion resistance of the tether, this issue being the last studied. Substantial work was also conducted on the design of the robotic platform, which has progressed very well. Finally, work on the MFL sensor, able to negotiate all pipeline obstacles (including plug valves), was initiated by PII following the successful completion of the subcontract negotiations between Foster-Miller and PII. The sensor design is at this point the critical path in the project's timetable.« less

  20. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less

  1. Impact of Requirements Quality on Project Success or Failure

    NASA Astrophysics Data System (ADS)

    Tamai, Tetsuo; Kamata, Mayumi Itakura

    We are interested in the relationship between the quality of the requirements specifications for software projects and the subsequent outcome of the projects. To examine this relationship, we investigated 32 projects started and completed between 2003 and 2005 by the software development division of a large company in Tokyo. The company has collected reliable data on requirements specification quality, as evaluated by software quality assurance teams, and overall project performance data relating to cost and time overruns. The data for requirements specification quality were first converted into a multiple-dimensional space, with each dimension corresponding to an item of the recommended structure for software requirements specifications (SRS) defined in IEEE Std. 830-1998. We applied various statistical analysis methods to the SRS quality data and project outcomes.

  2. Defining alternative rules in water and sanitation.

    PubMed

    Robert, J

    1995-11-01

    While the conventional water and sanitation package remains most prominent, alternatives exist to conventional waterworks and sanitation practices. Some alternate courses of action are considered. Promising an unprecedented availability of piped water, water development projects foster a pump-and-dump mentality even before they are completed. Often simply announcing the impending implementation of such projects encourages the intention among future beneficiaries to waste water resources. Alternatives to the domestic waste of water must be sought and implemented. Disestablishing water development, styles of alternative water technologies, decision-making and decision-makers, water policy scale, regenerating community access to sources, and water pricing are discussed.

  3. Experimental Demonstration of Technologies for Autonomous On-Orbit Robotic Assembly

    NASA Technical Reports Server (NTRS)

    LeMaster, Edward A.; Schaechter, David B.; Carrington, Connie K.

    2006-01-01

    The Modular Reconfigurable High Energy (MRHE) program aimed to develop technologies for the automated assembly and deployment of large-scale space structures and aggregate spacecraft. Part of the project involved creation of a terrestrial robotic testbed for validation and demonstration of these technologies and for the support of future development activities. This testbed was completed in 2005, and was thereafter used to demonstrate automated rendezvous, docking, and self-assembly tasks between a group of three modular robotic spacecraft emulators. This paper discusses the rationale for the MRHE project, describes the testbed capabilities, and presents the MRHE assembly demonstration sequence.

  4. Roadway delineation practices handbook

    DOT National Transportation Integrated Search

    2012-01-01

    Since 2007 the Eco-Logical grant program has funded 15 projects nationwide; twelve grant recipients completed their projects prior to 2012, two grant recipients completed their projects in the 2012 calendar year, and one anticipates finishing its pro...

  5. WETTABILITY AND PREDICTION OF OIL RECOVERY FROM RESERVOIRS DEVELOPED WITH MODERN DRILLING AND COMPLETION FLUIDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jill S. Buckley; Norman r. Morrow

    2002-06-01

    This first semiannual report covers efforts to select the materials that will be used in this project. Discussions of crude oils, rocks, smooth mineral surfaces, and drilling mud additives are included in this report.

  6. Development of a 3D FEM model for concrete tie and fastening systems.

    DOT National Transportation Integrated Search

    2015-01-31

    This project conducted detailed finite element (FE) modeling of the concrete crosstie and fastening system to better understand the mechanisms through which loads transfer within various track components in the lateral direction. This was completed b...

  7. Locomotive emissions test stand with particulate matter measurement integration : final report.

    DOT National Transportation Integrated Search

    2015-10-01

    This project builds upon previous research efforts, in which a complete instruction manual and bill of materials was developed for : a blueprint that allows any organization in the railroad industry to build their own locomotive emissions measurement...

  8. Development of Working Day Weather Charts for Transportation Construction in South Dakota

    DOT National Transportation Integrated Search

    1998-05-01

    Seasonal and daily weather events impact grading, surfacing and structure construction projects in various ways across the different climate regions of the state. When weather conditions prevent timely completion of major sequential components of a c...

  9. Smart Grid Cybersecurity: Job Performance Model Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Neil, Lori Ross; Assante, Michael; Tobey, David

    2012-08-01

    This is the project report to DOE OE-30 for the completion of Phase 1 of a 3 phase report. This report outlines the work done to develop a smart grid cybersecurity certification. This work is being done with the subcontractor NBISE.

  10. Automatic Commercial Permit Sets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grana, Paul

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  11. 7 CFR 4280.102 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Improvements Program § 4280.102 General. (a) Sections 4280.103 through 4280.106 discuss definitions, exception... evaluation process, and post-grant Federal requirements for both the simplified and full application processes. Sections 4280.115 through 4280.117 address project planning, development, and completion as...

  12. Court procedures for identifying problem drinkers : phase II

    DOT National Transportation Integrated Search

    1971-11-30

    This report summarizes the studies conducted in the first phase of the project and describes the tasks completed in the second phase. The court procedures manual developed in Phase I was reviewed by a panel of experts and subsequently revised. Three ...

  13. Andragogical Modeling and the Success of the "EMPACTS" project-based learning model in the STEM disciplines: A decade of growth and learner success in the 2Y College Learning Environment.

    NASA Astrophysics Data System (ADS)

    Phillips, C. D.; Thomason, R.; Galloway, M.; Sorey, N.; Stidham, L.; Torgerson, M.

    2014-12-01

    EMPACTS (Educationally Managed Projects Advancing Curriculum, Technology/Teamwork and Service) is a project-based, adult learning modelthat is designed to enhance learning of course content through real-world application and problem solving self directed and collaborative learning use of technology service to the community EMPACTS students are self-directed in their learning, often working in teams to develop, implement, report and present final project results. EMPACTS faculty use community based projects to increase deeper learning of course content through "real-world" service experiences. Learners develop personal and interpersonal work and communication skills as they plan, execute and complete project goals together. Technology is used as a tool to solve problems and to publish the products of their learning experiences. Courses across a broad STEM curriculum integrate the EMPACTS project experience into the overall learning outcomes as part of the learning college mission of preparing 2Y graduates for future academic and/or workforce success. Since the program began in 2005, there have been over 200 completed projects/year. Student driven successes have led to the establishment of an EMPACTS Technology Corp, which is funded through scholarship and allows EMPACTS learners the opportunity to serve and learn from one another as "peer instructors." Engineering and 3D graphic design teams have written technology proposals and received funding for 3D printing replication projects, which have benefited the college as a whole through grant opportunities tied to these small scale successes. EMPACTS students engage in a variety of outreachprojects with area schools as they share the successes and joys of self directed, inquiry, project based learning. The EMPACTS Program has successfully trained faculty and students in the implementation of the model and conduct semester to semester and once a year workshops for college and K-12 faculty, who are interested in enhancing the learning experience and retention of course content through meaningful, engaging, character building projects. Learner Project successes are celebrated and archived within the framework of the EMPACTS Student Project website. http://faculty.nwacc.edu/EAST_original/Spring2014/Spring2014index.htm

  14. Mixed-Dimensionality VLSI-Type Configurable Tools for Virtual Prototyping of Biomicrofluidic Devices and Integrated Systems

    NASA Astrophysics Data System (ADS)

    Makhijani, Vinod B.; Przekwas, Andrzej J.

    2002-10-01

    This report presents results of a DARPA/MTO Composite CAD Project aimed to develop a comprehensive microsystem CAD environment, CFD-ACE+ Multiphysics, for bio and microfluidic devices and complete microsystems. The project began in July 1998, and was a three-year team effort between CFD Research Corporation, California Institute of Technology (CalTech), University of California, Berkeley (UCB), and Tanner Research, with Mr. Don Verlee from Abbott Labs participating as a consultant on the project. The overall objective of this project was to develop, validate and demonstrate several applications of a user-configurable VLSI-type mixed-dimensionality software tool for design of biomicrofluidics devices and integrated systems. The developed tool would provide high fidelity 3-D multiphysics modeling capability, l-D fluidic circuits modeling, and SPICE interface for system level simulations, and mixed-dimensionality design. It would combine tools for layouts and process fabrication, geometric modeling, and automated grid generation, and interfaces to EDA tools (e.g. Cadence) and MCAD tools (e.g. ProE).

  15. A report on the USL NASA/RECON project. Part 1: The development of a transportable, university level, IS and R educational program

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Gallagher, Suzy; Granier, Martin

    1984-01-01

    A project is described which has as its goal the production of a set of system-independent, discipline-independent, transportable college level courses to educate science and engineering students in the use of large-scale information storage and retrieval systems. This project is being conducted with the cooperation and sponsorship of NASA by R and D teams at the University of Southwest Louisiana and Southern University. Chapter 1 is an introduction, providing an overview and a listing of the management phases. Chapter 2 furnishes general information regarding accomplishments in areas under development. Chapter 3 deals with the development of the course materials by presenting a series of diagrams and keys to depict the progress and interrelationships of various tasks and sub-tasks. Chapter 4 presents plans for activities to be conducted to complete and deliver course materials. The final chapter is a summary of project objectives, methods, plans, and accomplishments.

  16. Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1976-11-01

    The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hotmore » brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.« less

  17. Toward Effective and Compelling Instruction for High School eCommerce Students: Results from a Small Field Study

    ERIC Educational Resources Information Center

    Luterbach, Kenneth J.; Rodriguez, Diane; Love, Lakecia

    2012-01-01

    This paper describes an instructional development effort to create effective and compelling instruction for eCommerce students. Results from a small field study inform the development project. Four high school students in an eCommerce course completed the standalone tutorial developed to teach them how to create a web page in the HyperText Markup…

  18. Department of Defense High Performance Computing Modernization Program. 2006 Annual Report

    DTIC Science & Technology

    2007-03-01

    Department. We successfully completed several software development projects that introduced parallel, scalable production software now in use across the...imagined. They are developing and deploying weather and ocean models that allow our soldiers, sailors, marines and airmen to plan missions more effectively...and to navigate adverse environments safely. They are modeling molecular interactions leading to the development of higher energy fuels, munitions

  19. A Controlled Arc Welding and Separation Processes for Carbon Nanotubes

    NASA Technical Reports Server (NTRS)

    Benavides, Jeannette; Shaw, Harry; Day, John H. (Technical Monitor)

    2001-01-01

    Stage 1 for the Carbon Nanotube Project has been completed. This videograph presents the proposal for Stage 2. The goals of this stage are to: (1) produce CNTs under different conditions such as cooling temperature, voltage, current, cathode and anode sizes; (2) use ferrocene to make longer CNTs; (3) characterize CNTs by spectroscopic methods; (4) develop applications of CNTs, i.e., batteries, composites, wires, etc.; and (5) complete the patent application.

  20. Diagnostics of severe convection and subsynoptic scale ageostrophic circulations

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Diagnostics of severe convection and subsynoptic scale ageostrophic circulations are reported. Mesoscale circulations through forcing of ageostrophic motion by adiabatic, diabatic and frictional processes were studied. The development and application of a hybrid isentropic sigma coordinate numerical model was examined. The numerical model simulates mesoscale ageostrophic circulations associated with propagating jet streaks and severe convection. A complete list of publications and these completed through support of the NASA severe storms research project is included.

Top