Sample records for development pvtd project

  1. Property/composition relationships for Hanford high-level waste glasses melting at 115{degrees}C volume 1: Chapters 1-11

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hrma, P.R.; Piepel, G.F.

    1994-12-01

    A Composition Variation study (CVS) is being performed within the Pacific Northwest Laboratory Vitrification Technology Development (PVTD) project in support of a future high-level nuclear waste vitrification plant at the Hanford site in Washington. From 1989 to 1994, over 120 nonradioactive glasses were melted and properties measured in five statistically-designed experimental phases. Glass composition is represented by the 10 components SiO{sub 2}, B{sub 2}O{sub 3}, Al{sub 2}O{sub 3}, Fe{sub 2}O{sub 3}, ZrO{sub 2}, Na{sub 2}O, Li{sub 2}O, CaO, MgO, and Others (all remaining components). The properties measured include viscosity ({eta}), electrical conductivity ({epsilon}), glass transition temperature (T{sub g} ), thermalmore » expansion of solid glass ({alpha}{sub s}) and molten glass ({alpha}{sub m}), crystallinity (quenched and canister centerline cooled glasses), liquidus temperature (T{sub L}), durability based on normalized elemental releases from the Materials Characterization Center-1 28-day dissolution test (MCC-1, r{sub mi}) and the 7-day Product Consistency Test (PCT, r{sub pi}), and solution pHs from MCC-1 and PCT. Amorphous phase separation was also evaluated. Empirical first- and second-order mixture models were fit using the CVS data to relate the various properties to glass composition. Equations for calculating the uncertainty associated with property values predicted by the models were also developed. The models were validated using both internal and external data. Other modeling approaches (e.g., non-bridging oxygen, free energy of hydration, phase-equilibria T{sub L}) were investigated for specific properties. A preliminary Qualified Composition Region was developed to identify glass compositions with high confidence of being processable in a melter and meeting waste form acceptance criteria.« less

  2. Toolbox for Renewable Energy Project Development

    EPA Pesticide Factsheets

    The Toolbox for Renewable Energy Project Development summarizes key project development issues, addresses how to overcome major hurdles, and provides a curated directory of project development resources.

  3. Monitoring software development through dynamic variables

    NASA Technical Reports Server (NTRS)

    Doerflinger, Carl W.; Basili, Victor R.

    1983-01-01

    Research conducted by the Software Engineering Laboratory (SEL) on the use of dynamic variables as a tool to monitor software development is described. Project independent measures which may be used in a management tool for monitoring software development are identified. Several FORTRAN projects with similar profiles are examined. The staff was experienced in developing these types of projects. The projects developed serve similar functions. Because these projects are similar some underlying relationships exist that are invariant between projects. These relationships, once well defined, may be used to compare the development of different projects to determine whether they are evolving the same way previous projects in this environment evolved.

  4. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  5. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  6. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  7. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project development. 660.112 Section 660.112 Highways... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid...

  8. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project development. 660.112 Section 660.112 Highways... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid...

  9. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project development. 660.112 Section 660.112 Highways... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid...

  10. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project development. 660.112 Section 660.112 Highways... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid...

  11. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport development....107 Project eligibility: Airport development. (a) Except in the case of approved stage development, each project for airport development must provide for— (1) Development of an airport or unit of an...

  12. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Project eligibility: Airport development....107 Project eligibility: Airport development. (a) Except in the case of approved stage development, each project for airport development must provide for— (1) Development of an airport or unit of an...

  13. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    NASA Astrophysics Data System (ADS)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  14. 24 CFR 941.402 - Project design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project design and construction... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.402 Project design and.... A PHA may certify that its proposed design and construction plans for the development are in...

  15. Project-Based Module Development.

    ERIC Educational Resources Information Center

    Meel, R. M. van

    A project management design for modularizing higher education at open universities was developed and tested. Literature in the fields of project management and development of modular curriculum materials was reviewed and used as a basis for developing a project-based approach to the process of developing modules for self-instruction. According to…

  16. Building CHAOS: An Operating System for Livermore Linux Clusters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garlick, J E; Dunlap, C M

    2003-02-21

    The Livermore Computing (LC) Linux Integration and Development Project (the Linux Project) produces and supports the Clustered High Availability Operating System (CHAOS), a cluster operating environment based on Red Hat Linux. Each CHAOS release begins with a set of requirements and ends with a formally tested, packaged, and documented release suitable for use on LC's production Linux clusters. One characteristic of CHAOS is that component software packages come from different sources under varying degrees of project control. Some are developed by the Linux Project, some are developed by other LC projects, some are external open source projects, and some aremore » commercial software packages. A challenge to the Linux Project is to adhere to release schedules and testing disciplines in a diverse, highly decentralized development environment. Communication channels are maintained for externally developed packages in order to obtain support, influence development decisions, and coordinate/understand release schedules. The Linux Project embraces open source by releasing locally developed packages under open source license, by collaborating with open source projects where mutually beneficial, and by preferring open source over proprietary software. Project members generally use open source development tools. The Linux Project requires system administrators and developers to work together to resolve problems that arise in production. This tight coupling of production and development is a key strategy for making a product that directly addresses LC's production requirements. It is another challenge to balance support and development activities in such a way that one does not overwhelm the other.« less

  17. 24 CFR 941.306 - Maximum project cost.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Maximum project cost. 941.306... DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Application and Proposal § 941.306 Maximum project cost. (a) Calculation of maximum project cost. The maximum project cost represents the total amount of public housing...

  18. 24 CFR 941.306 - Maximum project cost.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Maximum project cost. 941.306... DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Application and Proposal § 941.306 Maximum project cost. (a) Calculation of maximum project cost. The maximum project cost represents the total amount of public housing...

  19. Solar Project Development Pathway & Resources

    EPA Pesticide Factsheets

    The Local Government Solar Project Portal's Solar Project Development Pathway and Resources page details the major steps along the project development pathway and each step includes resources and tools to assist you with that step.

  20. Genetic Programming as Alternative for Predicting Development Effort of Individual Software Projects

    PubMed Central

    Chavoya, Arturo; Lopez-Martin, Cuauhtemoc; Andalon-Garcia, Irma R.; Meda-Campaña, M. E.

    2012-01-01

    Statistical and genetic programming techniques have been used to predict the software development effort of large software projects. In this paper, a genetic programming model was used for predicting the effort required in individually developed projects. Accuracy obtained from a genetic programming model was compared against one generated from the application of a statistical regression model. A sample of 219 projects developed by 71 practitioners was used for generating the two models, whereas another sample of 130 projects developed by 38 practitioners was used for validating them. The models used two kinds of lines of code as well as programming language experience as independent variables. Accuracy results from the model obtained with genetic programming suggest that it could be used to predict the software development effort of individual projects when these projects have been developed in a disciplined manner within a development-controlled environment. PMID:23226305

  1. Integrating a Project Management Approach to E-Business Application Course

    ERIC Educational Resources Information Center

    Chen, Kuan C.; Chuang, Keh-Wen

    2008-01-01

    Teaching students project managements requires a hands-on approach. Incorporating project management concepts and processes into a student team Web development project adds a dimension that exposes students to the realities of effective Web development. This paper will describe the project management approach used in a Web development course in…

  2. Activities for Teaching the Gifted Across the Curriculum. 1985 Summer Institute.

    ERIC Educational Resources Information Center

    1985

    The document presents a collection of projects developed by teachers enrolled in a 3-week summer institute on teaching various curriculum areas to gifted students. Outlines of 11 projects begin with brief descriptive information on project title, developer(s), grade level, curriculum area, and project duration. The following projects are…

  3. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  4. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  5. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  6. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  7. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  8. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  9. Results of SEI Independent Research and Development Projects

    DTIC Science & Technology

    2007-07-01

    have established the following success criteria for our project : • developing a formal framework for systematically measuring a system’s attack...characteristics may change, depending on the current stage of the project development . During the initial stages of a project , one might see, for example...was based on the Siemens Global Studio project , which exists to provide a test bed for studying global development practices. The qualitative path

  10. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understandingmore » of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.« less

  11. Conducting Site and Economic Renewable Energy Project Feasibility Assessments

    EPA Pesticide Factsheets

    The Toolbox for Renewable Energy Project Development's Conducting Site and Economic Renewable Energy Project Feasibility Assessments page provides tools and resources to evaluate solar project feasibility and economics that influence project development.

  12. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  13. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  14. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  15. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  16. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  17. Development and Validation of a Project Package for Junior Secondary School Basic Science

    ERIC Educational Resources Information Center

    Udofia, Nsikak-Abasi

    2014-01-01

    This was a Research and Developmental study designed to develop and validate projects for Junior Secondary School Basic Science instruction and evaluation. The projects were developed using the project blueprint and sent for validation by experts in science education and measurement and evaluation; using a project validation scale. They were to…

  18. The USL NASA PC R and D project: Detailed specifications of objects

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Chum, Frank Y.; Hall, Philip P.; Moreau, Dennis R.; Triantafyllopoulos, Spiros

    1984-01-01

    The specifications for a number of projects which are to be implemented within the University of Southwestern Louisiana NASA PC R and D Project are discussed. The goals and objectives of the PC development project and the interrelationships of the various components are discussed. Six projects are described. They are a NASA/RECON simulator, a user interface to multiple remote information systems, evaluation of various personal computer systems, statistical analysis software development, interactive presentation system development, and the development of a distributed processing environment. The relationships of these projects to one another and to the goals and objectives of the overall project are discussed.

  19. Incremental development and prototyping in current laboratory software development projects: Preliminary analysis

    NASA Technical Reports Server (NTRS)

    Griesel, Martha Ann

    1988-01-01

    Several Laboratory software development projects that followed nonstandard development processes, which were hybrids of incremental development and prototyping, are being studied. Factors in the project environment leading to the decision to use a nonstandard development process and affecting its success are analyzed. A simple characterization of project environment based on this analysis is proposed, together with software development approaches which have been found effective for each category. These approaches include both documentation and review requirements.

  20. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    NASA Technical Reports Server (NTRS)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wissemann, Chris; White, Stanley M

    The primary objective of the project was to develop a innovative Gravity Base Foundation (GBF) concepts, including fabrication yards, launching systems and installation equipment, for a 500MW utility scale project in the Great Lakes (Lake Erie). The goal was to lower the LCOE by 25%. The project was the first to investigate an offshore wind project in the Great Lakes and it has furthered the body of knowledge for foundations and installation methods within Lake Erie. The project collected historical geotechnical information for Lake Erie and also used recently obtained data from the LEEDCo Icebreaker Project (FOA DE-EE0005989) geotechnical programmore » to develop the conceptual designs. Using these data-sets, the project developed design wind and wave conditions from actual buoy data in order to develop a concept that would de-risk a project using a GBF. These wind and wave conditions were then utilized to create reference designs for various foundations specific to installation in Lake Erie. A project partner on the project (Weeks Marine) provided input for construction and costing the GBF fabrication and installation. By having a marine contractor with experience with large marine projects as part of the team provides credibility to the LCOE developed by NREL. NREL then utilized the design and construction costing information as part of the LCOE model. The report summarizes the findings of the project; Developed a cost model and “baseline” LCOE; Documented Site Conditions within Lake Erie; Developed Fabrication, Installation and Foundations Innovative Concept Designs; Evaluated LCOE Impact of Innovations; Developed Assembly line “Rail System” for GBF Construction and Staging; Developed Transit-Inspired Foundation Designs which incorporated: Semi-Floating Transit with Supplemental Pontoons Barge mounted Winch System; Developed GBF with “Penetration Skirt”; Developed Integrated GBF with Turbine Tower; Developed Turbine, Plant Layout and O&M Strategies. The report details lowering LCOE by 22.3% and identified additional strategies that could further lower LCOE when building an utility scale wind farm in the Great Lakes.« less

  2. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project development. 660.112 Section 660.112 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by...

  3. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...

  4. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less

  5. 30 CFR 250.287 - For what development projects must I submit a DWOP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false For what development projects must I submit a... Operations Plans (dwop) § 250.287 For what development projects must I submit a DWOP? You must submit a DWOP for each development project in which you will use non-conventional production or completion...

  6. 30 CFR 250.287 - For what development projects must I submit a DWOP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and Information Deepwater Operations Plan (dwop) § 250.287 For what development projects must I submit a DWOP? You must submit a DWOP for each development project in which you will use non-conventional... 30 Mineral Resources 2 2014-07-01 2014-07-01 false For what development projects must I submit a...

  7. 30 CFR 250.287 - For what development projects must I submit a DWOP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and Information Deepwater Operations Plan (dwop) § 250.287 For what development projects must I submit a DWOP? You must submit a DWOP for each development project in which you will use non-conventional... 30 Mineral Resources 2 2013-07-01 2013-07-01 false For what development projects must I submit a...

  8. 30 CFR 250.287 - For what development projects must I submit a DWOP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and Information Deepwater Operations Plan (dwop) § 250.287 For what development projects must I submit a DWOP? You must submit a DWOP for each development project in which you will use non-conventional... 30 Mineral Resources 2 2012-07-01 2012-07-01 false For what development projects must I submit a...

  9. 30 CFR 250.287 - For what development projects must I submit a DWOP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SHELF Plans and Information Deepwater Operations Plans (dwop) § 250.287 For what development projects must I submit a DWOP? You must submit a DWOP for each development project in which you will use non... 30 Mineral Resources 2 2011-07-01 2011-07-01 false For what development projects must I submit a...

  10. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  11. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  12. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  13. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  14. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  15. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  16. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  17. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  18. The Development of an Instrument to Measure the Project Competences of College Students in Online Project-Based Learning

    ERIC Educational Resources Information Center

    Lin, Chien-Liang

    2018-01-01

    This study sought to develop a self-report instrument to be used in the assessment of the project competences of college students engaged in online project-based learning. Three scales of the KIPSSE instrument developed for this study, namely, the knowledge integration, project skills, and self-efficacy scales, were based on related theories and…

  19. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  20. Projecting manpower to attain quality

    NASA Technical Reports Server (NTRS)

    Rone, K. Y.

    1983-01-01

    The resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.

  1. Renewable Energy Development in Indian Country: A Handbook for Tribes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacCourt, D. C.

    2010-06-01

    This handbook is designed to be an accessible reference for those who are new to tribal energy project development or seek a refresher on key development issues as they navigate the project development process. It builds upon the wealth of feedback and experiences shared by tribal and other participants in the National Renewable Energy Laboratory's tribal energy training sessions to provide tribal leaders, tribal economic and energy enterprises, and those supporting them with a general overview of the renewable energy project development process as well as detailed guidance on the following: how to structure a renewable energy project transaction tomore » protect tribal interests, with an emphasis on joint project development efforts undertaken with nontribal parties; key energy development agreements, including power sale agreements, transmission and interconnection agreements, and land leases; and ways tribes can finance renewable energy projects, including the sources of funding or financing that may be available, the types of investors that may be available, and federal tax incentives for renewable energy projects.« less

  2. 24 CFR 203.28 - Economic soundness of projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Economic soundness of projects. 203.28 Section 203.28 Housing and Urban Development Regulations Relating to Housing and Urban Development... § 203.28 Economic soundness of projects. The mortgage must be executed with respect to a project which...

  3. 24 CFR 203.28 - Economic soundness of projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Economic soundness of projects. 203.28 Section 203.28 Housing and Urban Development Regulations Relating to Housing and Urban Development... § 203.28 Economic soundness of projects. The mortgage must be executed with respect to a project which...

  4. 24 CFR 203.28 - Economic soundness of projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Economic soundness of projects. 203.28 Section 203.28 Housing and Urban Development Regulations Relating to Housing and Urban Development... § 203.28 Economic soundness of projects. The mortgage must be executed with respect to a project which...

  5. 24 CFR 203.28 - Economic soundness of projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Economic soundness of projects. 203.28 Section 203.28 Housing and Urban Development Regulations Relating to Housing and Urban Development... § 203.28 Economic soundness of projects. The mortgage must be executed with respect to a project which...

  6. 24 CFR 203.28 - Economic soundness of projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Economic soundness of projects. 203.28 Section 203.28 Housing and Urban Development Regulations Relating to Housing and Urban Development... § 203.28 Economic soundness of projects. The mortgage must be executed with respect to a project which...

  7. Preparing project managers for faster-better-cheaper robotic planetary missions

    NASA Technical Reports Server (NTRS)

    Gowler, P.; Atkins, K.

    2003-01-01

    The authors have developed and implemented a week-long workshop for Jet Propulsion Laboratory Project Managers, designed around the development phases of the JPL Project Life Cycle. The workshop emphasizes the specific activities and deliverables that pertain to JPL managers of NASA robotic space exploration and instrument development projects.

  8. Integrating HCI Specialists into Open Source Software Development Projects

    NASA Astrophysics Data System (ADS)

    Hedberg, Henrik; Iivari, Netta

    Typical open source software (OSS) development projects are organized around technically talented developers, whose communication is based on technical aspects and source code. Decision-making power is gained through proven competence and activity in the project, and non-technical end-user opinions are too many times neglected. In addition, also human-computer interaction (HCI) specialists have encountered difficulties in trying to participate in OSS projects, because there seems to be no clear authority and responsibility for them. In this paper, based on HCI and OSS literature, we introduce an extended OSS development project organization model that adds a new level of communication and roles for attending human aspects of software. The proposed model makes the existence of HCI specialists visible in the projects, and promotes interaction between developers and the HCI specialists in the course of a project.

  9. Impact of agile methodologies on team capacity in automotive radio-navigation projects

    NASA Astrophysics Data System (ADS)

    Prostean, G.; Hutanu, A.; Volker, S.

    2017-01-01

    The development processes used in automotive radio-navigation projects are constantly under adaption pressure. While the software development models are based on automotive production processes, the integration of peripheral components into an automotive system will trigger a high number of requirement modifications. The use of traditional development models in automotive industry will bring team’s development capacity to its boundaries. The root cause lays in the inflexibility of actual processes and their adaption limits. This paper addresses a new project management approach for the development of radio-navigation projects. The understanding of weaknesses of current used models helped us in development and integration of agile methodologies in traditional development model structure. In the first part we focus on the change management methods to reduce request for change inflow. Established change management risk analysis processes enables the project management to judge the impact of a requirement change and also gives time to the project to implement some changes. However, in big automotive radio-navigation projects the saved time is not enough to implement the large amount of changes, which are submitted to the project. In the second phase of this paper we focus on increasing team capacity by integrating at critical project phases agile methodologies into the used traditional model. The overall objective of this paper is to prove the need of process adaption in order to solve project team capacity bottlenecks.

  10. Renewable Energy Project Development Resource Directory

    EPA Pesticide Factsheets

    The Renewable Energy Project Development Resource Directory provides a curated list of solar project development resources for higher education and local government, including case studies, guidance, fact sheets, presentations, templates, and more.

  11. Maintaining project consistency with transportation plans throughout the project life cycle with an emphasis on maintaining air quality conformity.

    DOT National Transportation Integrated Search

    2014-11-01

    This document was developed for transportation professionals responsible for project : development and has three basic goals: : 1. Define project consistency and identify the causes of project inconsistencies and the : critical junctures in the proje...

  12. Systems engineering real estate development projects

    NASA Astrophysics Data System (ADS)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  13. CHP Project Development

    EPA Pesticide Factsheets

    Access information and tools to support the CHP project development process, including identifying if your facility is a good fit for CHP, the steps involved with CHP project development, and policies and incentives supportive of CHP.

  14. A systematic review of studies evaluating Australian indigenous community development projects: the extent of community participation, their methodological quality and their outcomes.

    PubMed

    Snijder, Mieke; Shakeshaft, Anthony; Wagemakers, Annemarie; Stephens, Anne; Calabria, Bianca

    2015-11-21

    Community development is a health promotion approach identified as having great potential to improve Indigenous health, because of its potential for extensive community participation. There has been no systematic examination of the extent of community participation in community development projects and little analysis of their effectiveness. This systematic review aims to identify the extent of community participation in community development projects implemented in Australian Indigenous communities, critically appraise the qualitative and quantitative methods used in their evaluation, and summarise their outcomes. Ten electronic peer-reviewed databases and two electronic grey literature databases were searched for relevant studies published between 1990 and 2015. The level of community participation and the methodological quality of the qualitative and quantitative components of the studies were assessed against standardised criteria. Thirty one evaluation studies of community development projects were identified. Community participation varied between different phases of project development, generally high during project implementation, but low during the evaluation phase. For the majority of studies, methodological quality was low and the methods were poorly described. Although positive qualitative or quantitative outcomes were reported in all studies, only two studies reported statistically significant outcomes. Partnerships between researchers, community members and service providers have great potential to improve methodological quality and community participation when research skills and community knowledge are integrated to design, implement and evaluate community development projects. The methodological quality of studies evaluating Australian Indigenous community development projects is currently too weak to confidently determine the cost-effectiveness of community development projects in improving the health and wellbeing of Indigenous Australians. Higher quality studies evaluating community development projects would strengthen the evidence base.

  15. An Empirical Investigation of Pre-Project Partnering Activities on Project Performance in the Software Industry

    ERIC Educational Resources Information Center

    Proffitt, Curtis K.

    2012-01-01

    Project failure remains a challenge within the software development field especially during the early stages of the IT project development. Despite the herculean efforts by project managers and organizations to identify and offset problems, projects remain plagued with issues. If these challenges are not mitigated, to a successful degree,…

  16. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  17. Evaluation of a proposed expert system development methodology: Two case studies

    NASA Technical Reports Server (NTRS)

    Gilstrap, Lewey

    1990-01-01

    Two expert system development projects were studied to evaluate a proposed Expert Systems Development Methodology (ESDM). The ESDM was developed to provide guidance to managers and technical personnel and serve as a standard in the development of expert systems. It was agreed that the proposed ESDM must be evaluated before it could be adopted; therefore a study was planned for its evaluation. This detailed study is now underway. Before the study began, however, two ongoing projects were selected for a retrospective evaluation. They were the Ranging Equipment Diagnostic Expert System (REDEX) and the Backup Control Mode Analysis and Utility System (BCAUS). Both projects were approximately 1 year into development. Interviews of project personnel were conducted, and the resulting data was used to prepare the retrospective evaluation. Decision models of the two projects were constructed and used to evaluate the completeness and accuracy of key provisions of ESDM. A major conclusion reached from these case studies is that suitability and risk analysis should be required for all AI projects, large and small. Further, the objectives of each stage of development during a project should be selected to reduce the next largest area of risk or uncertainty on the project.

  18. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Project eligibility: Airport development... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.107 Project eligibility: Airport development. (a) Except in the case of approved stage development...

  19. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Project eligibility: Airport development... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.107 Project eligibility: Airport development. (a) Except in the case of approved stage development...

  20. 14 CFR 152.107 - Project eligibility: Airport development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Project eligibility: Airport development... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.107 Project eligibility: Airport development. (a) Except in the case of approved stage development...

  1. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  2. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  3. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project restrictions. 850.151... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  4. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    NASA Astrophysics Data System (ADS)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  5. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    NASA Technical Reports Server (NTRS)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  6. The PMDP Roadmap

    NASA Technical Reports Server (NTRS)

    2004-01-01

    NASA's complex and highly technical missions rely on effective project teams and managers. Since 1993, through its Project Management Development Process (PMDP), the Academy of Program and Project Leadership (APPL) has offered direction to the Agency's project practitioners as they advance in their careers. PMDP helps identify and sequence professional experiences, courses, and other project-based learning experiences that support individual career goals and center activities by outlining competencies at four levels of development. The result is that PMDP provides NASA project practitioners with a road map to the knowledge and competencies appropriate for their job and the jobs to which they aspire. Plus, new this year, APPL has rolled out its electronic Project Management Development Process (ePMDP) tool, a learning management system that includes a dynamic presentation of the PMDP levels, competency areas, competency organizational structures, Individual Development Plans (IDP), and online PMDP enrollment. APPL's website, www.appl.nasa.gov, provides access to ePMDP as well as other online resources for NASA practitioners enrolled in the Project Management Development Process.

  7. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2010-01-01

    NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several sub-elements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles' thermal control system. NASA's Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

  8. Library Instruction within the Curriculum--The Sciences, Business and Nursing. Projects Developed for a Faculty Development Seminar (Eau Claire, Wisconsin, May 21-22, August 19, and December 11, 1984).

    ERIC Educational Resources Information Center

    Stevens, Barbara R., Comp.; Engeldinger, Eugene A., Comp.

    A general list of suggestions for effective library instruction and library instruction projects in a variety of disciplines are presented in this guide. Developed for a faculty and academic staff development seminar, the Library Instruction within the Curriculum Project, these projects illustrate diverse approaches to library instruction with the…

  9. Faculty development projects for international health professions educators: Vehicles for institutional change?

    PubMed

    Burdick, William P; Friedman, Stacey R; Diserens, Deborah

    2012-01-01

    Projects are an important tool in faculty development, and project emphasis may offer insights into perceived education priorities. Impact of projects has been focused on individuals, not institutions or health. Education innovation projects of Fellows in an international faculty development program were examined to better understand perceived needs in health professions education and institutional impact of projects. Four hundred and thirty-five projects were analyzed to identify focus areas. Fellows were asked to identify changes in their schools and communities resulting from their projects. New education methods and curriculum change were common project focus areas. Regional differences were evident with a higher percentage of education methods projects by Fellows residing in India (52%), compared with South Africa (25%) and Brazil (24%). Fifty-six percent of projects were incorporated into the curriculum and/or incorporated as institutional policy. One-third to two-thirds of respondents noted improved teaching quality, collaboration, education research interest, assessment, student performance, and curriculum alignment with community health needs. National differences in project focus may offer insight into local conditions and needs. High rates of diffusion of projects and impact on faculty, students, and curriculum suggest that faculty development projects may be a strategy for institutional change in resource limited environments.

  10. Development of Procedures for Assessing the Impact of Vocational Education Research and Development on Vocational Education (Project IMPACT). Volume 4--A Case Study of Illinois Projects in Horticulture.

    ERIC Educational Resources Information Center

    Hook, Colin; Ethridge, James

    As part of Project IMPACT's efforts to identify and develop procedures for complying with the impact requirements of Public Law 94-482, a case study was made of Illinois Projects in Horticulture. Fourteen horticulture projects in high schools and junior colleges were discovered through a previous study, personal interviews with two University of…

  11. Develop a Skill while Learning about Human Development.

    ERIC Educational Resources Information Center

    Wiggins, R. Gene

    1979-01-01

    Described is a student group project involving the development of a slide presentation based on some aspect of human growth and development or educational psychology. Included in the description is a list of project titles and a sample of the project assignment outline. (JMD)

  12. Project Plan: The MEDARP Documentation Unit to the School Improvement and Local School Development Projects.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    The Metropolitan Educational Development and Research Project (MEDARP) Documentation Unit, located in the Office of Educational Evaluation (OEE) at the New York City Board of Education, is funded by the Ford Foundation to document, evaluate and provide technical assistance to the School Improvement and Local School Development Projects; these are…

  13. Putting the Q into Quality Project Management

    ERIC Educational Resources Information Center

    Lockitt, Bill

    2007-01-01

    Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken;…

  14. DIVISION OF ISOTOPES DEVELOPMENT RESEARCH AND DEVELOPMENT PROJECTS: 1968. Progress Reports on Sponsored Work.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1969-01-01

    This is the second edition of the Division of Isotopes Development project summaries. It presents a short summary of objectives, results, and future plans for each research or development project sponsored by the Division within each of eight program areas.

  15. Communication challenges in system development: involvement of system developers in small-scale IT projects.

    PubMed

    Petersen, Lone Stub; Bjoernes, Charlotte D; Bertelsen, Pernille

    2010-01-01

    A well-known challenge in system development is the aspect of user participation. In this paper we shift perspective from how to involve users in system development to how project managers with a clinical background, but without technical system knowledge, can involve system developers in IT projects. Using data from the development of an online patient book (an ICT application for clinical practice), we analyze challenges using the concept of language-games. We conclude that further research and development of participatory and communicative methods to involve system developers in IT projects, based in a clinical context, is needed.

  16. Simulation Of Research And Development Projects

    NASA Technical Reports Server (NTRS)

    Miles, Ralph F.

    1987-01-01

    Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.

  17. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    NASA Technical Reports Server (NTRS)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  18. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    NASA Astrophysics Data System (ADS)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  19. Examining the Dynamics of Managing Information Systems Development Projects: A Control Loss Perspective

    ERIC Educational Resources Information Center

    Narayanaswamy, Ravi

    2009-01-01

    The failure rate of information systems development (ISD) projects continues to pose a big challenge for organizations. The success rate of ISD projects is less then forty percent. Factors such as disagreements and miscommunications among project manager and team members, poor monitoring and intermediary problems contribute to project failure.…

  20. Measuring Learners' Attitudes toward Team Projects: Scale Development Through Exploratory And Confirmatory Factor Analyses

    ERIC Educational Resources Information Center

    Chyung, Seung Youn; Winiecki, Donald J.; Hunt, Gary; Sevier, Carol M.

    2017-01-01

    Team projects are increasingly used in engineering courses. Students may develop attitudes toward team projects from prior experience, and their attitudinal responses could influence their performance during team project-based learning in the future. Thus, instructors need to measure students' attitudes toward team projects during their learner…

  1. Concentrating Solar Power Projects - Gulang 100MW Thermal Oil Parabolic

    Science.gov Websites

    Trough project | Concentrating Solar Power | NREL Gulang 100MW Thermal Oil Parabolic Trough project Status Date: September 29, 2016 Project Overview Project Name: Gulang 100MW Thermal Oil Parabolic ): Webmaster Solar Participants Developer(s): Changzhou Royal Tech Solar Thermal Equipment Co., Ltd. Owner(s

  2. Exploring the clean development mechanism: Malaysian case study.

    PubMed

    Pedersen, Anne

    2008-02-01

    During 2006 the CDM market in Malaysia became established and by December 2007 a total of 20 Malaysian projects had registered with the CDM Executive Board. The Kyoto Protocol defines the Annex 1 countries, as countries that are obliged to reduce their greenhouse gas (GHG) emissions and the clean development mechanism (CDM) allows Annex 1 countries to develop projects, which contribute to emission reduction, in non-Annex 1 (developing) countries. Currently, two projects have been corrected due to request for review and there is one project for which review is requested. Two projects have been rejected by the Executive Board. The broad knowledge of CDM in Malaysia and the number of successful projects are partly due to the well-functioning CDM institutional framework in Malaysia. As an illustration this article focuses on a Malaysian-Danish project and describes the implementation of CDM in Malaysia and refers to this specific project. The project was registered with the CDM Executive Board in May 2007 and is a methane avoidance project in which methane is captured from a landfill and used to generate electricity.

  3. Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, C.; Lightman, A.

    This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.

  4. EXOS research on master controllers for robotic devices

    NASA Technical Reports Server (NTRS)

    Marcus, Beth A.; An, Ben; Eberman, Brian

    1992-01-01

    Two projects are currently being conducted by EXOS under the Small Business Innovation Research (SBIR) program with NASA. One project will develop a force feedback device for controlling robot hands, the other will develop an elbow and shoulder exoskeleton which can be integrated with other EXOS devices to provide whole robot arm and hand control. Aspects covered are the project objectives, important research issues which have arisen during the developments, and interim results of the projects. The Phase 1 projects currently underway will result in hardware prototypes and identification of research issues required for complete system development and/or integration.

  5. 42 CFR 417.920 - Planning and initial development.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Planning and initial development. 417.920 Section... and initial development. (a) Under section 1304 of the PHS Act, grants and loan guarantees were awarded for projects for planning and initial development of HMOs. (b) Planning projects included projects...

  6. Avoiding re-inventing the wheel in a people-centered approach to REDD+.

    PubMed

    Holmes, Ignacia; Potvin, Catherine

    2014-10-01

    One important debate regarding Reducing Emissions from Deforestation and Forest Degradation (REDD+) in developing countries concerns the manner in which its implementation might affect local and indigenous communities. New ways to implement this mechanism without harming the interests of local communities are emerging. To inform this debate, we conducted a qualitative research synthesis to identify best practices (BPs) from people-centered approaches to conservation and rural development, developed indicators of BPs, and invited development practitioners and researchers in the field to assess how the identified BPs are being adopted by community-level REDD+ projects in Latin America. BPs included: local participation in all phases of the project; project supported by a decentralized forest governance framework; project objectives matching community livelihood priorities; project addressing community development needs and expectations; project enhancing stakeholder collaboration and consensus building; project applying an adaptive management approach; and project developing national and local capacities. Most of the BPs were part of the evaluated projects. However, limitations of some of the projects related to decentralized forest governance, matching project objectives with community livelihood priorities, and addressing community development needs. Adaptive management and free and prior informed consent have been largely overlooked. These limitations could be addressed by integrating conservation outcomes and alternative livelihoods into longer-term community development goals, testing nested forest governance approaches in which national policies support local institutions for forest management, gaining a better understanding of the factors that will make REDD+ more acceptable to local communities, and applying an adaptive management approach that allows for social learning and capacity building of relevant stakeholders. Our study provides a framework of BPs and indicators that could be used by stakeholders to improve REDD+ project design, monitoring, and evaluation, which may help reconcile national initiatives and local interests without reinventing the wheel. © 2014 Society for Conservation Biology.

  7. Review of operations in the Virginia Department of Transportation's project development process.

    DOT National Transportation Integrated Search

    2007-01-01

    The Virginia Department of Transportation's (VDOT's) project development process (PDP) directs how construction projects are developed. The purpose of this study was to evaluate the manner in which operations is currently considered throughout the PD...

  8. Development in understanding of Gauss-Krüger projection and its outcomes

    NASA Astrophysics Data System (ADS)

    Masaharu, Hiroshi

    2018-05-01

    The role of Gauss and Krüger is made clear in developing Gauss-Krüger projection. Gauss developed the projection and Krüger had brought Gauss's posthumous work into the open. From studying such historical issues, useful projection formula was found and this is now implemented for actual usage in surveying in Japan.

  9. The Impact of Project Role on Perceptions of Risk and Performance in Information Technology Software Development: A Comparative Analysis

    ERIC Educational Resources Information Center

    Okongo, James

    2014-01-01

    The failure rate of information technology (IT) development projects is a significant concern for today's organizations. Perceptions of IT project risk and project performance have been identified as important factors by scholars studying the topic, and Wallace, Keil, and Rai (2004a) developed a survey instrument to measure how dimensions of…

  10. The management and design of economic development projects: A case study of World Bank electricity projects in Egypt

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    El Sabaa, S.M.

    1992-01-01

    This study is concerned with the efficiency of World Bank projects in Egypt. The study seeks improvements in the methods of evaluating public sector projects in Egypt. To approaches are employed: (1) project identification to optimally allocate Egypt's and World Bank's resources; (2) project appraisal to assess the economic viability and efficiency of investments. The electricity sector is compared with the agriculture sector as a means of employing project identification for priority ordering of investment for development in Egypt. The key criteria for evaluation are the impacts of developments of each sector upon Egypt's national objectives and needs. These includemore » employment opportunities, growth, alleviation of poverty, cross comparison of per capita consumption in each sector, economic rate of return, national security, balance of payments and foreign debt. The allocation of scarce investments would have been more efficient in agriculture than in electricity in meeting Egypt's national objectives and needs. World Bank lending programs in Egypt reveal a priority ordering of electricity over agriculture and rural development. World Bank development projects in Egypt have not been optimally identified, and its programs have not followed an efficient allocation of World Bank's and Egypt's resources. The key parameters in evaluating economic viability and efficiency of development projects are: (1) the discount rate (the opportunity cost of public funds); (2) the exchange rate; and (3) the cost of major inputs, as approximated by shadow prices of labor, water, electricity, and transportation for development projects. Alternative approaches to estimating the opportunity cost of public funds are made. The parameters in evaluating the efficiency of projects have not been accurately estimated in the appraisal stage of the World Bank projects in Egypt, resulting in false or misleading information concerning the economic viability and efficiency of the projects.« less

  11. THE APPLICATION AND DEVELOPMENT OF APPROPRIATE TOOLS AND TECHNOLOGIES FOR COST-EFFECTIVE CARBON SEQUESTRATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Stanley; Sandra Brown; Ellen Hawes

    2002-09-01

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research projects is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas impacts. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: advanced videography testing; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less

  12. 13 CFR 305.12 - Project sign.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....12 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the Federal government is participating in the Project. The EDA regional office will provide mandatory...

  13. THE CHANGING SCHOOL CURRICULUM.

    ERIC Educational Resources Information Center

    GOODLAD, JOHN I.; AND OTHERS

    DEVELOPMENTS IN ELEMENTARY AND SECONDARY SCHOOL CURRICULUM REVISION FROM 1950 TO 1963 ARE REVIEWED AND EVALUATED. SCHOOL VISITATIONS, PROGRESS REPORTS, PROJECT CRITIQUES, AND INTERVIEWS AND CORRESPONDENCE WITH PROJECT DIRECTORS WERE USED TO OBTAIN INFORMATION ABOUT CURRICULUM DEVELOPMENT PROJECTS. PROJECT DESCRIPTIONS GENERALLY INCLUDE--(1) A…

  14. 7 CFR 1207.311 - Programs and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and projects mean those research, development, advertising or promotion programs or projects developed by the...

  15. Software engineering with application-specific languages

    NASA Technical Reports Server (NTRS)

    Campbell, David J.; Barker, Linda; Mitchell, Deborah; Pollack, Robert H.

    1993-01-01

    Application-Specific Languages (ASL's) are small, special-purpose languages that are targeted to solve a specific class of problems. Using ASL's on software development projects can provide considerable cost savings, reduce risk, and enhance quality and reliability. ASL's provide a platform for reuse within a project or across many projects and enable less-experienced programmers to tap into the expertise of application-area experts. ASL's have been used on several software development projects for the Space Shuttle Program. On these projects, the use of ASL's resulted in considerable cost savings over conventional development techniques. Two of these projects are described.

  16. Photovoltaic Subcontract Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Surek, Thomas; Catalano, Anthony

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT)more » project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  17. Advanced Development Projects for Constellation From The Next Generation Launch Technology Program Elements

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Saiyed, Naseem H.; Swith, Marion Shayne

    2005-01-01

    When United States President George W. Bush announced the Vision for Space Exploration in January 2004, twelve propulsion and launch system projects were being pursued in the Next Generation Launch Technology (NGLT) Program. These projects underwent a review for near-term relevance to the Vision. Subsequently, five projects were chosen as advanced development projects by NASA s Exploration Systems Mission Directorate (ESMD). These five projects were Auxiliary Propulsion, Integrated Powerhead Demonstrator, Propulsion Technology and Integration, Vehicle Subsystems, and Constellation University Institutes. Recently, an NGLT effort in Vehicle Structures was identified as a gap technology that was executed via the Advanced Development Projects Office within ESMD. For all of these advanced development projects, there is an emphasis on producing specific, near-term technical deliverables related to space transportation that constitute a subset of the promised NGLT capabilities. The purpose of this paper is to provide a brief description of the relevancy review process and provide a status of the aforementioned projects. For each project, the background, objectives, significant technical accomplishments, and future plans will be discussed. In contrast to many of the current ESMD activities, these areas are providing hardware and testing to further develop relevant technologies in support of the Vision for Space Exploration.

  18. Development of Procedures for Assessing the Impact of Vocational Education Research and Development on Vocational Education (Project IMPACT). Volume 2--A Case Study of the Illinois Occupational Curriculum Project.

    ERIC Educational Resources Information Center

    Cheney-Stern, Marilyn R.; Phelps, L. Allen

    As part of Project IMPACT's efforts to develop procedures for complying with the impact requirements of Public Law 94-482, a case study was made of the Illinois Occupational Curriculum Project (IOCP). The top-down study traced the IOCP from its developers to its users and documented measurable changes in the 1971 versus the 1979 curriculum…

  19. Medical education research for radiologists: a road map for developing a project.

    PubMed

    Gaetke-Udager, Kara; Yablon, Corrie M

    2015-04-01

    Medical education research is challenging to do well, but researchers can develop a robust project with knowledge of basic principles. Thoughtful creation of a study question, development of a conceptual framework, and attention to study design are crucial to developing a successful project. A thorough understanding of research methods and elements of survey design is necessary. Projects that result in changes to behavior, clinical practice, and patient outcomes have the most potential for success.

  20. Guidebook to Geothermal Finance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salmon, J. P.; Meurice, J.; Wobus, N.

    This guidebook is intended to facilitate further investment in conventional geothermal projects in the United States. It includes a brief primer on geothermal technology and the most relevant policies related to geothermal project development. The trends in geothermal project finance are the focus of this tool, relying heavily on interviews with leaders in the field of geothermal project finance. Using the information provided, developers and investors may innovate in new ways, developing partnerships that match investors' risk tolerance with the capital requirements of geothermal projects in this dynamic and evolving marketplace.

  1. DOE's Tribal Energy Program Offers Resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Douglas C. MacCourt, Chair, Indian Law Practice, Ater Wynne LLP

    2010-06-01

    This handbook is an accessible reference for those who are new to tribal energy project development or who seek a refresher on key development issues as they navigate the project development process. Building upon the wealth of feedback and experiences shared by tribal and other participants in tribal energy workshops conducted by the National Renewable Energy Laboratory, it is designed to provide tribal leaders, tribal economic and energy enterprises, and those supporting them with a general overview of the renewable energy project development process. It includes information on how to structure a renewable energy project transaction to protect tribal interests,more » with an emphasis on joint project development efforts undertaken with nontribal parties; a general overview of key energy development agreements, including power sale agreements, transmission and interconnection agreements, and land leases; and a detailed discussion of ways tribes can finance renewable energy projects, the sources of funding or financing that may be available, the types of investors that may be available, and federal tax incentives for renewable energy projects. The guide also includes a glossary of some of the most commonly used technical terms.« less

  2. Workshop Report: Distributive Education Project Development Workshop. (Wisconsin Univ., Madison, July 30-August 11, 1967).

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. School of Education.

    This report of a 2-week workshop contains four papers presented by their authors, eight business presentations, and 1 group and 24 individual projects developed by the workshop participants. The papers pertain to project evaluation, project information, project training and distributive programs. The business presentations relate to new products,…

  3. California Schools Develop Joint Faculty Journalism Project.

    ERIC Educational Resources Information Center

    Patt, Bruce E.

    1995-01-01

    Describes the Joint Faculty Journalism project, undertaken in 1994-95 by California's community colleges and universities to develop methods for increasing alliances with journalism practitioners. Discusses project objectives and resulting recommendations related to increasing student recruitment and success. Reviews positive project outcomes and…

  4. Managers Handbook for Software Development

    NASA Technical Reports Server (NTRS)

    Agresti, W.; Mcgarry, F.; Card, D.; Page, J.; Church, V.; Werking, R.

    1984-01-01

    Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

  5. Prisons and Primary Schools: Using CHAT to Analyse the Relationship between Developing Identity, Developing Musicianship and Transformative Processes

    ERIC Educational Resources Information Center

    Henley, Jennie

    2015-01-01

    This paper draws on three different research projects to demonstrate the use of an expanded model of Cultural Historical Activity Theory (CHAT), developed as part of a doctoral research study. The first project is an evaluation of the impacts of a Music Partnership Project within Primary and Secondary schools. The second project is an evaluation…

  6. Project Development Model | Integrated Energy Solutions | NREL

    Science.gov Websites

    . The five elements of project fundamentals are: Baseline: Analyze the current situation for the site . The two-phase iterative model includes elements in project fundamentals and project development based State and Local Energy Data (SLED) tool, developed by NREL for the U.S. Department of Energy, to get

  7. 7 CFR 4280.187 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... General Energy Audit and Renewable Energy Development Assistance Grants § 4280.187 Project eligibility. To be eligible for an energy audit or a renewable energy development assistance grant, the grant funds... projects are eligible for energy audits and renewable energy development assistance. Per consultation with...

  8. 7 CFR 4280.187 - Project eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... General Energy Audit and Renewable Energy Development Assistance Grants § 4280.187 Project eligibility. To be eligible for an energy audit or a renewable energy development assistance grant, the grant funds... projects are eligible for energy audits and renewable energy development assistance. Per consultation with...

  9. 7 CFR 4280.187 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... General Energy Audit and Renewable Energy Development Assistance Grants § 4280.187 Project eligibility. To be eligible for an energy audit or a renewable energy development assistance grant, the grant funds... projects are eligible for energy audits and renewable energy development assistance. Per consultation with...

  10. TOPEX Project Radar Altimeter Development Requirements and Specifications, Version 6.0

    NASA Technical Reports Server (NTRS)

    Rossi, Laurence C.

    2003-01-01

    This document provides the guidelines by which the TOPEX Radar Altimeter hardware development effort for the TOPEX flight project shall be implemented and conducted. The conduct of this activity shall take maximum advantage of the efforts expended during the TOPEX Radar Altimeter Advanced Technology Model development program and other related Radar Altimeter development efforts. This document complies with the TOPEX Project Office document 633-420 (D-2218), entitled, "TOPEX Project Requirements and Constraints for the NASA Radar Altimeter" dated December 1987.

  11. Guidelines for CSM project development.

    PubMed

    1983-01-01

    This document summarizes guidelines for contraceptive social marketing project development prepared by the International Contraceptive Social Marketing Project (ICSMP) as an aid to consultants and technical assistance contractors. The ICSMP has developed a checklist to guide planning in 4 major areas: 1) project organization and management structure, 2) target market, 3) product line, and 4) pricing strategy and project costs. A clear statement of project objectives is essential, and these objectives must be internally consistent so that strategies to accomplish them can be unified. The position of each governmental entity and sponsoring agency involved in the social marketing project must be clearly understood. Projects receiving US government funds must have a mechanism for financial and programmatic reporting and accountability. Thorough knowledge of commercial rules and regulations in a country is necessary for planning. To ascertain whether the necessary resources are available, it is necessary to examine the existing marketing infrastructure in terms of distribution, advertising, market research, and packagaing capabilities. The target market should be specified in quantifiable terms; in addition, a consumer profile that defines the overall demographics of the country, the family planning environment, and potential social marketing consumers should be developed. The couple years of protection projection can be translated into the percentage of the target market that the project expects to capture. It is necessary to price products early in project development in order to assess program costs. Revenue projections should be based on previous calculations of couple year of protection goals, product line, product price, and price structure. Each element of the advertsing budget should be justifiable in terms of project objectives. Finally, positions and anticpated salaries for staff should be specified through the 1st 3 years of project implementation.

  12. Software Engineering Research/Developer Collaborations in 2005

    NASA Technical Reports Server (NTRS)

    Pressburger, Tom

    2006-01-01

    In CY 2005, three collaborations between software engineering technology providers and NASA software development personnel deployed three software engineering technologies on NASA development projects (a different technology on each project). The main purposes were to benefit the projects, infuse the technologies if beneficial into NASA, and give feedback to the technology providers to improve the technologies. Each collaboration project produced a final report. Section 2 of this report summarizes each project, drawing from the final reports and communications with the software developers and technology providers. Section 3 indicates paths to further infusion of the technologies into NASA practice. Section 4 summarizes some technology transfer lessons learned. Also included is an acronym list.

  13. Humane Education Projects Handbook.

    ERIC Educational Resources Information Center

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  14. Photovoltaic Subcontract Program. Annual report, FY 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  15. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketingmore » tools to support outreach efforts targeting the public, vendors, investors and government audiences.« less

  16. Landfill Gas Energy Project Development Handbook

    EPA Pesticide Factsheets

    View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.

  17. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  18. Including information technology project management in the nursing informatics curriculum.

    PubMed

    Sockolow, Paulina; Bowles, Kathryn H

    2008-01-01

    Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.

  19. Interim report projects funded by EEC (European Economic Community) for offshore research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parrott, M.

    1978-10-01

    In Nov. 1973, the EEC first adopted the principle of subsidizing work in the offshore field to improve technological development activities; since 1973, the EEC has awarded three programs (for 1974, 1975, and 1977) for 95 projects. The most recent grants, in 1977, for 40 projects at a subsidy cost of $66.8 million are tabulated, showing project category, company, estimated investment, and project description. Project categories include pipelaying, pipeline transport, underwater storage, LNG storage and transport, etc. Under the grant system, the community contributes 40Vertical Bar3< to projects on exploration and production techniques, 35Vertical Bar3< for development of production equipmentmore » and machinery, and 25-30Vertical Bar3< for technological development projects for transport and storage of hydrocarbons. According to the EEC commission, 65 projects have been submitted for a fourth program for which the total amount provided in the budget is $43.8 million.« less

  20. 24 CFR 92.612 - Project requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...

  1. 24 CFR 92.612 - Project requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...

  2. 24 CFR 92.612 - Project requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...

  3. 24 CFR 92.612 - Project requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...

  4. 24 CFR 92.612 - Project requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...

  5. 14 CFR 1216.305 - Criteria for actions requiring environmental assessments.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... assessment are: (1) Specific spacecraft development and flight projects in space science. (2) Specific spacecraft development and flight projects in space and terrestrial applications. (3) Specific experimental... spacecraft development and flight projects. (2) R&D activities in space and terrestrial applications (e.g...

  6. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  7. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  8. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  9. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  10. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  11. Criteria for Developing a Successful Privatization Project

    DTIC Science & Technology

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  12. Project to Incorporate Anthropological Concepts of Human Diversity in Secondary School Social Studies Curricula (Project Anthropology). Final Report, 2/1/80 to 1/31/82.

    ERIC Educational Resources Information Center

    Giannangelo, Duane M.; And Others

    Learning modules emphasizing the anthropological aspects of human and race relations to supplement social studies textbooks used in grades 7-12 were developed. The final report describes pre-project activities, module development, and project evaluation and accomplishments. Pre-project activities included media publicity, reviewing social studies…

  13. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or..., 1983 and (2) apply generally to rental housing projects not assisted under the Housing Development...

  14. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or..., 1983 and (2) apply generally to rental housing projects not assisted under the Housing Development...

  15. Landfill Gas Energy Project Development Handbook Files

    EPA Pesticide Factsheets

    View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.

  16. Partnering Community Decision Makers with Early Career Scientists - The NASA DEVELOP Method for Dual Capacity Building

    NASA Astrophysics Data System (ADS)

    Ross, K. W.; Childs-Gleason, L. M.; Cripps, G. S.; Clayton, A.; Remillard, C.; Watkins, L. E.; Allsbrook, K. N.; Rogers, L.; Ruiz, M. L.

    2017-12-01

    The NASA DEVELOP National Program carries out many projects every year with the goal of bringing the benefits of NASA Earth science to bear on decision-making challenges that are local in scale. Every DEVELOP project partners end users with early/transitioning science professionals. Many of these projects invited communities to consider NASA science data in new ways to help them make informed decisions. All of these projects shared three characteristics: they were rapid, nimble and risk-taking. These projects work well for some communities, but might best be suited as a feasibility studies that build community/institutional capacity towards eventual solutions. This presentation will discuss DEVELOP's lessons learned and best practices in conducting short-term feasibility projects with communities, as well as highlight several past successes.

  17. The DEVELOP Program as a Unique Applied Science Internship

    NASA Astrophysics Data System (ADS)

    Skiles, J. W.; Schmidt, C. L.; Ruiz, M. L.; Cawthorn, J.

    2004-12-01

    The NASA mission includes "Inspiring the next generation of explorers" and "Understanding and protecting our home planet". DEVELOP students conduct research projects in Earth Systems Science, gaining valuable training and work experience, which support accomplishing this mission. This presentation will describe the DEVELOP Program, a NASA human capital development initiative, which is student run and student led with NASA scientists serving as mentors. DEVELOP began in 1998 at NASA's Langley Research Center in Virginia and expanded to NASA's Stennis Space Center in Mississippi and Marshall Space Flight Center in Alabama in 2002. NASA's Ames Research Center in California began DEVELOP activity in 2003. DEVELOP is a year round activity. High school through graduate school students participate in DEVELOP with students' backgrounds encompassing a wide variety of academic majors such as engineering, biology, physics, mathematics, computer science, remote sensing, geographic information systems, business, and geography. DEVELOP projects are initiated when county, state, or tribal governments submit a proposal requesting students work on local projects. When a project is selected, science mentors guide students in the application of NASA applied science and technology to enhance decision support tools for customers. Partnerships are established with customers, professional organizations and state and federal agencies in order to leverage resources needed to complete research projects. Student teams are assigned a project and are responsible for creating an inclusive project plan beginning with the design and approach of the study, the timeline, and the deliverables for the customer. Project results can consist of student papers, both team and individually written, face-to-face meetings and seminars with customers, presentations at national meetings in the form of posters and oral papers, displays at the Western and Southern Governors' Associations, and visualizations produced by the students. Projects have included Homeland Security in Virginia, Energy Management in New Mexico, Water Management in Mississippi, Air Quality Management in Alabama, Invasive Species mapping in Nevada, Public Health risk assessment in California, Disaster Management in Oklahoma, Agricultural Efficiency in South Dakota, Coastal Management in Louisiana and Carbon Management in Oregon. DEVELOP students gain experience in applied science, computer technology, and project management. Several DEVELOP projects will be demonstrated and discussed during this presentation. DEVELOP is sponsored by the Applications Division of NASA's Science Mission Directorate.

  18. Framing the Future: People, Places, Projects.

    ERIC Educational Resources Information Center

    Knapsey, Kath

    This publication describes six Framing the Future (FTF) staff development projects that use work-based learning with different project teams and learning activities varying from general awareness to specific skills development in Australia. "The Center for Human Services--Working for Its People" describes a project that introduced a…

  19. 12 CFR 952.5 - Community Investment Cash Advance Programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... chapter. (2) Each Bank shall offer a CIP to provide financing for housing projects and for eligible... than CIP, involving a combination of housing projects and economic development projects, only the... respective CICA program. (2) For projects funded under CIP, both the housing and economic development...

  20. 12 CFR 952.5 - Community Investment Cash Advance Programs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... chapter. (2) Each Bank shall offer a CIP to provide financing for housing projects and for eligible... than CIP, involving a combination of housing projects and economic development projects, only the... respective CICA program. (2) For projects funded under CIP, both the housing and economic development...

  1. 12 CFR 952.5 - Community Investment Cash Advance Programs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... chapter. (2) Each Bank shall offer a CIP to provide financing for housing projects and for eligible... than CIP, involving a combination of housing projects and economic development projects, only the... respective CICA program. (2) For projects funded under CIP, both the housing and economic development...

  2. 12 CFR 952.5 - Community Investment Cash Advance Programs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... chapter. (2) Each Bank shall offer a CIP to provide financing for housing projects and for eligible... than CIP, involving a combination of housing projects and economic development projects, only the... respective CICA program. (2) For projects funded under CIP, both the housing and economic development...

  3. The ECE Culminating Design Experience: Analysis of ABET 2000 Compliance at Leading Academic Institutions

    DTIC Science & Technology

    2006-05-01

    a significant design project that requires development of a large scale software project . A distinct shortcoming of Purdue ECE...18-540: Rapid Prototyping of Computer Systems This is a project -oriented course which will deal with all four aspects of project development ; the...instructors, will develop specifications for a mobile computer to assist in inspection and maintenance. The application will be partitioned

  4. The Sears-Roebuck Foundation Partnership Development Fund Keep Amrica Working Project To Develop an Articulated Nursing Education Program: Final Project Report.

    ERIC Educational Resources Information Center

    Jackson, Marie; Brown, Norman D.

    In 1989, a project was undertaken by Tyler Junior College (TJC) in cooperation with the University of Texas at Tyler (UTT) to develop a career-oriented, articulated nursing education program. The project had four main objectives: (1) to provide a comprehensive course of study which would facilitate student progression from admission to a career as…

  5. SH-2F LAMPS Instructional Systems Development: Phase II. Final Report.

    ERIC Educational Resources Information Center

    Gibbons, Andrew S.; Hymes, Jonah P.

    This project was one of four aircrew training development projects in a continuing study of the methodology, effectiveness, and resource requirements of the Instructional Systems Development (ISD) process. This report covers the Phase II activities of a two-phase project for the development of aircrew training for SH-2F anti-submarine warfare…

  6. Using Professional Development to Achieve Classroom Reform and Science Proficiency: An Urban Success Story from Southern Nevada, USA

    ERIC Educational Resources Information Center

    Crippen, Kent J.; Biesinger, Kevin D.; Ebert, Ellen K.

    2010-01-01

    This paper provides a detailed description and evaluation of a three-year professional development project in a large urban setting in the southwestern United States. The impetus for the project was curriculum development focused on integrated scientific inquiry. Project goals included the development of a professional learning community, reformed…

  7. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation questionnaire, and a scoring formula.

  8. Development and implementation of a residency project advisory board.

    PubMed

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  9. NASA Work Breakdown Structure (WBS) Handbook

    NASA Technical Reports Server (NTRS)

    Fleming, Jon F.; Poole, Kenneth W.

    2016-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  10. Work Breakdown Structure (WBS) Handbook

    NASA Technical Reports Server (NTRS)

    2010-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  11. Integrating NASA Earth Observations into the Global Indicator Framework for Monitoring the United Nations' Sustainable Development Goals

    NASA Astrophysics Data System (ADS)

    Crepps, G.; Gotschalk, E.; Childs-Gleason, L. M.; Favors, J.; Ruiz, M. L.; Allsbrook, K. N.; Rogers, L.; Ross, K. W.

    2016-12-01

    The NASA DEVELOP National Program conducts rapid 10-week feasibility projects that build decision makers' capacity to utilize NASA Earth observations in their decision making. Teams, in collaboration with partner organizations, conduct projects that create end products such as maps, analyses, and automated tools tailored for their partners' specific decision making needs. These projects illustrate the varied applications about which Earth observations can assist in making better informed decisions, such topics as land use changes, ecological forecasting, public health, and species habitats. As a capacity building program, DEVELOP is interested in understanding how these end products are utilized once the project is over and if Earth observations become a regular tool in the partner's decision making toolkit. While DEVELOP's niche is short-term projects, to assess the impacts of these projects, a longer-term scale is needed. As a result, DEVELOP has created a project strength metrics, and partner assessments, pre- and post-project, as well as a follow up form. This presentation explores the challenges in both quantitative and qualitative assessments of valuing the contributions of these Earth observation tools. This proposal lays out the assessment framework created within the program, and illustrates case studies in which projects have been assessed and long-term partner use of tools examined and quantified.

  12. APPLICATION AND DEVELOPMENT OF APPROPRIATE TOOLS AND TECHNOLOGIES FOR COST-EFFECTIVE CARBON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Stanley; Sandra Brown; Ellen Hawes

    2003-09-01

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas impacts. The research described in this report occurred between July 1, 2002 and June 30, 2003. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: advanced videography testing; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less

  13. Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Stanley; Sandra Brown; Patrick Gonzalez

    2004-07-10

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas impacts. The research described in this report occurred between July 1, 2002 and June 30, 2003. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: remote sensing for carbon analysis; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less

  14. Project development process.

    DOT National Transportation Integrated Search

    2007-08-01

    The following chapter explains the purpose of this document, outlines the essential elements involved in : the Project Development Process, describes the differences in the three main project classifications, and : provides the necessary background i...

  15. Fidelity of test development process within a national science grant

    NASA Astrophysics Data System (ADS)

    Brumfield, Teresa E.

    In 2002, a math-science partnership (MSP) program was initiated by a national science grant. The purpose of the MSP program was to promote the development, implementation, and sustainability of promising partnerships among institutions of higher education, K-12 schools and school systems, as well as other important stakeholders. One of the funded projects included a teacher-scientist collaborative that instituted a professional development system to prepare teachers to use inquiry-based instructional modules. The MSP program mandated evaluations of its funded projects. One of the teacher-scientist collaborative project's outcomes specifically focused on teacher and student science content and process skills. In order to provide annual evidence of progress and to measure the impact of the project's efforts, and because no appropriate science tests were available to measure improvements in content knowledge of participating teachers and their students, the project contracted for the development of science tests. This dissertation focused on the process of test development within an evaluation and examined planned (i.e., expected) and actual (i.e., observed) test development, specifically concentrating on the factors that affected the actual test development process. Planned test development was defined as the process of creating tests according to the well-established test development procedures recommended by the AERA/APA/NCME 1999 Standards for Educational and Psychological Testing. Actual test development was defined as the process of creating tests as it actually took place. Because case study provides an in-depth, longitudinal examination of an event (i.e., case) in a naturalistic setting, it was selected as the appropriate methodology to examine the difference between planned and actual test development. The case (or unit of analysis) was the test development task, a task that was bounded by the context in which it occurred---and over which this researcher had no control---and by time. The purpose for studying the case was to gain a more in-depth, holistic understanding of the real-life test development task that took place within a project evaluation context. In particular, this case study investigated how the actual test development process was affected by: (1) the national and state (i.e., NC) science standards, (2) the NSF's definition of "evidence" in a project evaluation, (3) the MSP project's understanding of the role of the to-be-developed tests in their project evaluation, (4) the MSP project's understanding of the test development process, and (5) the MSP project's participants (e.g., teacher item-writers and scientists). From an investigation of this case, it was concluded that: (a) constructing psychometrically sound tests within an evaluation is not easy, (b) sufficient time and resources to construct such measures properly are seldom provided, and (c) test construction---at least within an evaluation---is not routine and unproblematic. Based upon the results from this case study, it was recommended that stakeholders (i.e., program managers, project directors, and evaluators) be familiar with the steps and standards used to develop psychometrically sound tests. Additionally, it was recommended that, for future research, a meta-analysis that examines only the test development process be conducted of all other MSP projects. A second suggested future research area was to establish a protocol that provides a systematic means by which to examine an existing or proposed MSP project for alignment with state science standards. Such a protocol would be cost-effective in that demonstrated alignment with state science standards would enable projects to use existing state science assessments, which must be in place, according to NCLB, by the 2007-2008 school year, to demonstrate student achievement. In this way, project directors and evaluators, typically with limited familiarity with the steps and standards by which psychometrically sound assessments are created, would not be placed in the role of test developer.

  16. Against all odds: Tales of survival and growth of the Foundational Approaches in Science Teaching (FAST) project

    NASA Astrophysics Data System (ADS)

    Yamamoto, Karen Kina

    This study examines the dynamics of survival and growth of curricular and instructional innovations. It focuses on the Foundational Approaches in Science Teaching (FAST) project, a long-term survivor of reform in science education. Key questions guiding this study include: (1) How did the FAST project survive over the past 30 years? (2) What elements are essential for long-term survival and growth of an innovative science program? (3) Why did the project continue to survive amidst several waves of educational reform? The core of my conceptual framework is that the odds of survival and growth of curricular and instructional innovations are increased by the extent to which resources, theory-based curriculum development processes, and professional development strategies are not only incorporated into but also interdependent within a project. With this framework as a guide, the main methods of data collection were document analysis, interviews, and observations. FAST, developed by the University of Hawaii's Curriculum Research and Development Group (CRDG), consists of a sequential and interdisciplinary middle and high school science program for students in grades 6-10. According to the results of this study, the project was able to survive by receiving constant organizational support from CRDG and a steady source of State funding through the university since 1966; it also retained a relatively small but stable staff of highly qualified project personnel. Formulated on a discipline-based theory that values development of students' intellectual capacities as the platform for curriculum research, design, and development, the FAST project translated this vision of science education into key elements of an innovative program that survived and thrived: (1) an interdisciplinary program consisting of physical, biological, and earth sciences; inquiry as content and process; history and philosophy of science; and links between and among sciences, technology, and society; and (2) teaching and learning strategies that model a community of practicing scientists. This study also identified the main elements of professional development strategies essential for an innovative project's survival and growth: linking curriculum development to required pre-implementation inservice training, engaging project personnel in both of these phases recruiting, training a cadre of experienced FAST teachers as inservice trainers, and providing follow-up professional development seminars. In conclusion, the FAST project survived mainly because the longevity of its leaders gave stability and continuity to the project. Against many odds such as limited financial resources and a small number of staff positions relative to the project's scope, the leaders managed with whatever resources were available to link theory-based curriculum development with professional development and, thereby, increase the project's chances for survival and growth.

  17. DEVELOPING AND IMPLEMENTING AN ESTUARINE WATER QUALITY MONITORING, ASSESSMENT AND OUTREACH PROGRAM/THE MYSOUND PROJECT

    EPA Science Inventory

    EPA has developed a technology transfer handbook for the EMPACT MYSound Project. The handbook highlights information and monitoring technologies developed from the EMPACT Long Island Sound Marine Monitoring (MYSound) Project. As part of the MYSound effort, telemetering data-buoys...

  18. 14 CFR 151.21 - Procedures: Application; general information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects... Federal aid for eligible airport development must submit to the Area Manager of the area in which the... the project development; and (2) The sponsor's written assurance, if the project involves displacement...

  19. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shonder, John A; Hughes, Patrick; Atkin, Erica

    2006-11-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipmentmore » prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.« less

  20. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  1. Year 2000 Computerized Farm Project. Final Report.

    ERIC Educational Resources Information Center

    McGrann, James M.; Lippke, Lawrence A.

    An ongoing project was funded to develop and demonstrate a computerized approach to operation and management of a commercial-sized farm. Other project objectives were to facilitate the demonstration of the computerized farm to the public and to develop individual software packages and make them available to the public. Project accomplishments…

  2. Collaborative Teacher Learning: Findings from Two Professional Development Projects

    ERIC Educational Resources Information Center

    Erickson, G.; Minnes Brandes, G.; Mitchell, I.; Mitchell, J.

    2005-01-01

    This article discusses two projects that were aimed at enhancing the opportunities for professional development of the participants through collaboration between classroom teachers and teacher educators. The two projects, the Australian Project for Enhancing Effective Learning (PEEL) and the Canadian Learning Strategies Group (LSG), focused on the…

  3. The New Social Studies in Perspective: The Carnegie-Mellon Slow-Learner Project.

    ERIC Educational Resources Information Center

    Penna, Anthony N.

    1995-01-01

    Describes the origins, development, and products of the slow- learner social studies curriculum development project at Carnegie-Mellon University (Pennsylvania) in the late 1960s. Maintains that this project represented the last wave of curriculum projects to emerge from the national reform efforts following Sputnik. (CFR)

  4. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  5. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  6. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  7. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  8. Let's Build a Sailboat: A Differentiated Gifted Education Project.

    ERIC Educational Resources Information Center

    Forster, Bruce R.

    1990-01-01

    A rationale is presented for developing gifted education projects that are differentiated from the regular curriculum. A specific activity, called "Let's Build a Sailboat," is described to illustrate guiding principles for success in student project development. The project taught planning and management skills to junior high school gifted…

  9. Low-cost solar array project and Proceedings of the 15th Project Integration Meeting

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is described. Project analysis and integration, technology development in silicon material, large area silicon sheet and encapsulation, production process and equipment development, engineering, and operation are included.

  10. RETNA: Regional Employment and Training Needs Assessment Project.

    ERIC Educational Resources Information Center

    Coffey, Janis Cox

    The Regional Employment and Training Needs Assessment (RETNA) project was organized to determine both current and projected employment and training needs in specific industries and occupations in the Sacramento area. The project involves the development of a prototypical computerized database developed from survey research on employment needs and…

  11. Factors promoting sustainability of education innovations: a comparison of faculty perceptions and existing frameworks.

    PubMed

    Loh, Lawrence C; Friedman, Stacey R; Burdick, William P

    2013-01-01

    Health professions education uses innovative projects to promote faculty development and institution change. Faculty perceptions of the factors that promote project sustainability affect how faculty conceptualize and implement their innovations, which influences whether and how they plan for sustainability. This paper compares educators' perceptions of factors that influence sustainability in innovative projects with factors identified in project sustainability literature, to identify areas of convergence and divergence. Using questionnaires, faculty development fellowship participants from Brazil and India shared their perceptions on factors influencing their project's sustainability. An analysis framework was developed from existing project sustainability literature; faculty responses were then coded through an iterative process. Key sustainability themes identified by faculty included project-level factors related to project design, stakeholder support, monitoring and evaluation, and project outcomes. Identified context level factors were related to institutional and governmental support as well as self-motivation and peer support. Availability of resources and funding were identified as relevant at both the project and context levels. Project-level factors were more often cited than context-level factors as key to ensuring sustainability. Faculty development efforts in health professions education should employ strategies to target these themes in promoting innovation sustainability. These include preengagement with institutional leaders, alignment with public sector goals, strategic diffusion of information, project expansion and transferability, capacity building in monitoring and evaluation, and creation of a community of educators for information exchange and support.

  12. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2011-01-01

    The now-cancelled Constellation Program included the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, were planned to be manned space vehicles while the third element was much more diverse and included several sub-elements. Among other things, these sub-elements were Rovers and a Lunar Habitat. The planned missions involving these systems and vehicles included several risks and design challenges. Due to the unique thermal operating environment, many of these risks and challenges were associated with the vehicles thermal control system. NASA s Exploration Technology Development Program (ETDP) consisted of various technology development projects. The project chartered with mitigating the aforementioned thermal risks and design challenges was the Thermal Control System Development for Exploration Project. These risks and design challenges were being addressed through a rigorous technology development process that was planned to culminate with an integrated thermal control system test. Although the technologies being developed were originally aimed towards mitigating specific Constellation risks, the technology development process is being continued within a new program. This continued effort is justified by the fact that many of the technologies are generically applicable to future spacecraft thermal control systems. The current paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing a material compatibility assessment for a promising thermal control system working fluid. The to-date progress and lessons-learned from these development efforts will be discussed throughout the paper.

  13. Laboratory-directed research and development: FY 1996 progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil, J.; Prono, J.

    1997-05-01

    This report summarizes the FY 1996 goals and accomplishments of Laboratory-Directed Research and Development (LDRD) projects. It gives an overview of the LDRD program, summarizes work done on individual research projects, and provides an index to the projects` principal investigators. Projects are grouped by their LDRD component: Individual Projects, Competency Development, and Program Development. Within each component, they are further divided into nine technical disciplines: (1) materials science, (2) engineering and base technologies, (3) plasmas, fluids, and particle beams, (4) chemistry, (5) mathematics and computational sciences, (6) atomic and molecular physics, (7) geoscience, space science, and astrophysics, (8) nuclear andmore » particle physics, and (9) biosciences.« less

  14. Designing, Developing and Implementing WWW-Based Distance Learning.

    ERIC Educational Resources Information Center

    Riley, Peter C.

    The rapid advancement of communication technologies is resulting in a wide array of design and development choices for distance learning projects. The 58th Special Operations Wing at Kirtland Air Force Base, New Mexico, is developing a prototype distance learning project designed to serve geographically separated learner populations. Project staff…

  15. Manpower Research and Development Projects; 1973 Edition.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC.

    The third edition of Manpower Research and Development Projects presents descriptions of 455 projects which are grouped by subject matter to facilitate description of the research and development program and the use of the material. The 199 doctoral dissertation grants and the 12 manpower research institutional grants are classified by subject…

  16. The Empty Shops Project: Developing Rural Students' Sociological Insight

    ERIC Educational Resources Information Center

    Willis, Evan; Burns, Edgar

    2011-01-01

    An informal research project with high local relevance was developed for a first-year sociology course at an Australian rural university campus. The project developed students' sociological insight by challenging them to investigate "truths" about their own region, rather than immediately pushing them to comprehend new and different…

  17. 7 CFR 985.31 - Research and development proj-ects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Research and development proj-ects. 985.31 Section 985.31 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... Research § 985.31 Research and development proj-ects. The Committee, with the approval of the Secretary...

  18. 7 CFR 985.31 - Research and development proj-ects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Research and development proj-ects. 985.31 Section 985.31 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... Research § 985.31 Research and development proj-ects. The Committee, with the approval of the Secretary...

  19. 7 CFR 985.31 - Research and development proj-ects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Research and development proj-ects. 985.31 Section 985.31 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... Research § 985.31 Research and development proj-ects. The Committee, with the approval of the Secretary...

  20. 7 CFR 985.31 - Research and development proj-ects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Research and development proj-ects. 985.31 Section 985.31 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... Research § 985.31 Research and development proj-ects. The Committee, with the approval of the Secretary...

  1. Professional Competence Development at the Cooper Union School of Engineering. Project Report.

    ERIC Educational Resources Information Center

    Bussard, Ellen

    A 3-year project was developed to increase students' abilities to perform competently as professional engineers. The project sought to infuse into existing courses concern for, practice with, and development of three competencies critical to professional success: problem-solving, communication, and value clarification. Eight elementary and…

  2. Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project

    DTIC Science & Technology

    2005-09-30

    Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project William R. Metzger Marine...Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT

  3. Computer Lessons for Written Harmony. Final Project Report.

    ERIC Educational Resources Information Center

    Arenson, Michael A.

    This project was created to help music students in their development of part-writing and harmonization skills, requirements for college-level music study. It was developed and programmed by members of the Instructional Technology Center and Department of Music at the University of Delaware. The software developed during this project provides…

  4. Teachers' Reflections on an Education for Sustainable Development Project

    ERIC Educational Resources Information Center

    Villanen, Heli

    2014-01-01

    Sustainable development includes controversial values and complex issues such as energy consumption contra natural resources. This paper discusses a school project involving teachers from pre-schools to upper secondary schools in Sweden. The project aimed to support the teaching of energy issues and more generally sustainable development. During…

  5. 23 CFR 450.318 - Transportation planning studies and project development.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Transportation planning studies and project development... § 450.318 Transportation planning studies and project development. (a) Pursuant to section 1308 of the... transportation operator(s) may undertake a multimodal, systems-level corridor or subarea planning study as part...

  6. A CMMI-based approach for medical software project life cycle study.

    PubMed

    Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi

    2013-01-01

    In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.

  7. Natural gas projects in the developing world: An empirical evaluation of merits, obstacles, and risks

    NASA Astrophysics Data System (ADS)

    Mor, Amit

    Significant amounts of natural gas have been discovered in developing countries throughout the years during the course of oil exploration. The vast majority of these resources have not been utilized. Some developing countries may benefit from a carefully planned utilization of their indigenous resources, which can either be exported or used domestically to substitute imported or exportable fuels or feedstock. Governments, potential private sector investors, and financiers have been searching for strategies to promote natural gas schemes, some of which have been in the pipeline for more than two decades. The purpose of this thesis is to identify the crucial factors determining the success or failure of launching natural gas projects in the developing world. The methodology used to evaluate these questions included: (1) establishing a representative sample of natural gas projects in developing countries that were either implemented or failed to materialize during the 1980-1995 period, (2) utilizing a Probit limited dependent variable econometric model in which the explained variable is project success or failure, and (3) choosing representing indicators to reflect the assumed factors affecting project success. The study identified two conditions for project success: (1) the economic viability of the project and (2) securing financing for the investment. The factors that explain the ability or inability of the sponsors to secure financing were: (1) the volume of investment that represented the large capital costs of gas transportation, distribution, and storage, (2) the level of foreign exchange constraint in the host country, and (3) the level of development of the country. The conditions for private sector participation in natural gas projects in developing countries were identified in the study by a Probit model in which the explained variable was private sector participation. The results showed that a critical condition for private sector participation is the financial profitability of a project. Other factors that explained private sector participation and the ability of the private-sector sponsor to secure financing for a project were: (1) the political risk associated with the project, (2) the foreign exchange constraint associated with the project, and (3) whether the project was domestic or export-oriented.

  8. Professional Development Capacity Building in Pennsylvania's Regional Staff Development Program: The "WorkNet" Project. Final Report [and] WorkNet Workplace Literacy Trainer's Guide.

    ERIC Educational Resources Information Center

    Carman, Priscilla S.

    These two documents are products of a project to improve the capability of the Pennsylvania Regional Staff Development Centers to provide current, research-based workplace literacy training and technical assistance to adult basic and literacy education programs. The final report describes these project activities: development of training materials…

  9. Automated support for experience-based software management

    NASA Technical Reports Server (NTRS)

    Valett, Jon D.

    1992-01-01

    To effectively manage a software development project, the software manager must have access to key information concerning a project's status. This information includes not only data relating to the project of interest, but also, the experience of past development efforts within the environment. This paper describes the concepts and functionality of a software management tool designed to provide this information. This tool, called the Software Management Environment (SME), enables the software manager to compare an ongoing development effort with previous efforts and with models of the 'typical' project within the environment, to predict future project status, to analyze a project's strengths and weaknesses, and to assess the project's quality. In order to provide these functions the tool utilizes a vast corporate memory that includes a data base of software metrics, a set of models and relationships that describe the software development environment, and a set of rules that capture other knowledge and experience of software managers within the environment. Integrating these major concepts into one software management tool, the SME is a model of the type of management tool needed for all software development organizations.

  10. An Initial Evaluation of Siting Considerations on Current and Future Wind Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tegen, Suzanne; Lantz, Eric; Mai, Trieu

    This report provides a deeper understanding of the wind project development process, from desktop studies to a successful project in the ground. It examines three siting consideration categories that wind project sponsors must include in the development process: wildlife (species that live in, near, or migrate through the area where wind development is possible), radar (wind turbines can cause interference with radar signals), and public engagement (representing communities and stakeholders who live near wind power projects). The research shows that although this country's abundant wind resource provides numerous options for addressing siting considerations, actually siting individual projects is becoming moremore » difficult because of regulatory and other uncertainties. Model results are based on the premise that developers will be able to site, permit, and build successful projects, which is not always the case in reality.« less

  11. Bridging the Gap Between NASA Earth Observations and Decision Makers Through the NASA Develop National Program

    NASA Astrophysics Data System (ADS)

    Remillard, C. M.; Madden, M.; Favors, J.; Childs-Gleason, L.; Ross, K. W.; Rogers, L.; Ruiz, M. L.

    2016-06-01

    The NASA DEVELOP National Program bridges the gap between NASA Earth Science and society by building capacity in both participants and partner organizations that collaborate to conduct projects. These rapid feasibility projects highlight the capabilities of satellite and aerial Earth observations. Immersion of decision and policy makers in these feasibility projects increases awareness of the capabilities of Earth observations and contributes to the tools and resources available to support enhanced decision making. This paper will present the DEVELOP model, best practices, and two case studies, the Colombia Ecological Forecasting project and the Miami-Dade County Ecological Forecasting project, that showcase the successful adoption of tools and methods for decision making. Through over 90 projects each year, DEVELOP is always striving for the innovative, practical, and beneficial use of NASA Earth science data.

  12. The 'Seamless Web': the development of the electronic patient record in Aarhus region, Denmark.

    PubMed

    Jensen, C B

    2003-01-01

    The article surveys the organization of the current project to develop an electronic patient record in the Aarhus Region, Denmark. The article is based on various policy documents and reports as well as a number of semi-structured interviews with project managers from the EPR organization in Aarhus County and with participants in the development process at local hospitals. This material is used to present and discuss the framing of the project in a 'discourse coalition'. The stabilization of a specific discourse coalition has been an important factor in ensuring the success of the development project up to the present moment. This coalition became relatively stable by integrating a diverse set of actors in a story-line about the relationships between co-operation, management and technology in the medial sector, and has influenced the modular organization of the project. The successful maintenance of the discourse coalition allows the project to appear 'seamless' from the outside. Conversely, the project is likely to be continually reviewed as successful only to the extent that it is able to flexibly keep the fluctuating set of relevant actors in alignment. If the practical work of keeping a coalition in place remains invisible it becomes easy to imagine an ideal way of planning large socio-technical projects, like developing an ECR. But practical success is more likely to be achieved if one takes seriously the thorough intertwining of discursive, organizational and technical aspects of development projects.

  13. How the bioanalytical scientist plays a key role in interdisciplinary project teams in the development of biotherapeutics - a reflection of the European Bioanalysis Forum.

    PubMed

    Dudal, Sherri; Staack, Roland F; Stoellner, Daniela; Fjording, Marianne Scheel; Vieser, Eva; Pascual, Marie-Hélène; Brudny-Kloeppel, Margarete; Golob, Michaela

    2014-05-01

    The bioanalytical scientist plays a key role in the project team for the drug development of biotherapeutics from the discovery to the marketing phase. Information from the project team members is required for assay development and sample analysis during the discovery, preclinical and clinical phases of the project and input is needed from the bioanalytical scientist to help data interpretation. The European Bioanalysis Forum target team 20 discussed many of the gaps in information and communication between the bioanalytical scientist and project team members as a base for providing a perspective on the bioanalytical scientist's role and interactions within the project team.

  14. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order tomore » accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.« less

  15. AKM in Open Source Communities

    NASA Astrophysics Data System (ADS)

    Stamelos, Ioannis; Kakarontzas, George

    Previous chapters in this book have dealt with Architecture Knowledge Management in traditional Closed Source Software (CSS) projects. This chapterwill attempt to examine the ways that knowledge is shared among participants in Free Libre Open Source Software (FLOSS 1) projects and how architectural knowledge is managed w.r.t. CSS. FLOSS projects are organized and developed in a fundamentally different way than CSS projects. FLOSS projects simply do not develop code as CSS projects do. As a consequence, their knowledge management mechanisms are also based on different concepts and tools.

  16. Project management in the development of scientific software

    NASA Astrophysics Data System (ADS)

    Platz, Jochen

    1986-08-01

    This contribution is a rough outline of a comprehensive project management model for the development of software for scientific applications. The model was tested in the unique environment of the Siemens AG Corporate Research and Technology Division. Its focal points are the structuring of project content - the so-called phase organization, the project organization and the planning model used, and its particular applicability to innovative projects. The outline focuses largely on actual project management aspects rather than associated software engineering measures.

  17. Development of Production-Intent Plug-In Hybrid Vehicle Using Advanced Lithium-Ion Battery Packs with Deployment to a Demonstration Fleet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    No, author

    2013-09-29

    The primary goal of this project was to speed the development of one of the first commercially available, OEM-produced plug-in hybrid electric vehicles (PHEV). The performance of the PHEV was expected to double the fuel economy of the conventional hybrid version. This vehicle program incorporated a number of advanced technologies, including advanced lithium-ion battery packs and an E85-capable flex-fuel engine. The project developed, fully integrated, and validated plug-in specific systems and controls by using GM’s Global Vehicle Development Process (GVDP) for production vehicles. Engineering Development related activities included the build of mule vehicles and integration vehicles for Phases I &more » II of the project. Performance data for these vehicles was shared with the U.S. Department of Energy (DOE). The deployment of many of these vehicles was restricted to internal use at GM sites or restricted to assigned GM drivers. Phase III of the project captured the first half or Alpha phase of the Engineering tasks for the development of a new thermal management design for a second generation battery module. The project spanned five years. It included six on-site technical reviews with representatives from the DOE. One unique aspect of the GM/DOE collaborative project was the involvement of the DOE throughout the OEM vehicle development process. The DOE gained an understanding of how an OEM develops vehicle efficiency and FE performance, while balancing many other vehicle performance attributes to provide customers well balanced and fuel efficient vehicles that are exciting to drive. Many vehicle content and performance trade-offs were encountered throughout the vehicle development process to achieve product cost and performance targets for both the OEM and end customer. The project team completed two sets of PHEV development vehicles with fully integrated PHEV systems. Over 50 development vehicles were built and operated for over 180,000 development miles. The team also completed four GM engineering development Buy-Off rides/milestones. The project included numerous engineering vehicle and systems development trips including extreme hot, cold and altitude exposure. The final fuel economy performance demonstrated met the objectives of the PHEV collaborative GM/DOE project. Charge depletion fuel economy of twice that of the non-PHEV model was demonstrated. The project team also designed, developed and tested a high voltage battery module concept that appears to be feasible from a manufacturability, cost and performance standpoint. The project provided important product development and knowledge as well as technological learnings and advancements that include multiple U.S. patent applications.« less

  18. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bonnal, P.; Féral, B.; Kershaw, K.

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies andmore » development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.« less

  19. Combined Heat and Power Protocol for Uniform Methods Project | Advanced

    Science.gov Websites

    Manufacturing Research | NREL Combined Heat and Power Protocol for Uniform Methods Project Combined Heat and Power Protocol for Uniform Methods Project NREL developed a protocol that provides a ; is consistent with the scope and other protocols developed for the Uniform Methods Project (UMP

  20. 2+2+2 Dissemination Project Final Report.

    ERIC Educational Resources Information Center

    Sloane, Diana; And Others

    An overview is provided in this three-part final report of a project designed to disseminate information to assist California high schools, Regional Occupation Programs, and colleges in developing and strengthening 2+2+2 programs. Part I reviews the following project objectives: (1) hire a project coordinator and technical assistant; (2) develop a…

  1. THe Case Method of Instruction (CMI) Project. Final Report.

    ERIC Educational Resources Information Center

    McWilliam, P. J.; And Others

    This final report describes the Case Method of Instruction (CMI) Project, a project to develop, field test, and disseminate training materials to facilitate the use of the Case Method of Instruction by inservice and preservice instructors in developmental disabilities. CMI project activities focused on developing a collection of case stories and…

  2. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dinehart, M.

    1996-09-01

    This document reports status and technical progress for Los Alamos National Laboratories 94-1 Research and Development projects. An introduction to the project structure and an executive summary are included. Projects described include Electrolytic Decontamination, Combustibles, Detox, Sand, Slag, and Crucible, Surveillance, and Core Technology.

  3. 14 CFR 152.205 - United States share of project costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false United States share of project costs. 152... share of project costs. (a) Airport development. Except as provided in paragraphs (b) and (c) of this section, the following is the United States share of the allowable cost of an airport development project...

  4. 14 CFR 152.205 - United States share of project costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false United States share of project costs. 152... share of project costs. (a) Airport development. Except as provided in paragraphs (b) and (c) of this section, the following is the United States share of the allowable cost of an airport development project...

  5. 14 CFR 152.205 - United States share of project costs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false United States share of project costs. 152... share of project costs. (a) Airport development. Except as provided in paragraphs (b) and (c) of this section, the following is the United States share of the allowable cost of an airport development project...

  6. 14 CFR 152.205 - United States share of project costs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false United States share of project costs. 152... share of project costs. (a) Airport development. Except as provided in paragraphs (b) and (c) of this section, the following is the United States share of the allowable cost of an airport development project...

  7. 14 CFR 152.205 - United States share of project costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false United States share of project costs. 152... share of project costs. (a) Airport development. Except as provided in paragraphs (b) and (c) of this section, the following is the United States share of the allowable cost of an airport development project...

  8. Low-cost solar array project and Proceedings of the 14th Project Integration Meeting

    NASA Technical Reports Server (NTRS)

    Mcdonald, R. R.

    1980-01-01

    Activities are reported on the following areas: project analysis and integration; technology development in silicon material, large area sheet silicon, and encapsulation; production process and equipment development; and engineering and operations, and the steps taken to integrate these efforts. Visual materials presented at the project Integration Meeting are included.

  9. 75 FR 51441 - Mid-Atlantic Fishery Management Council (MAFMC); Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... development of the Visioning Project. DATES: The meeting will be held Thursday, September 9, 2010, from 10 a.m...: The purpose of this meeting is to begin the development of the Council's Visioning Project. The... project goals. The initial purpose of the project is to identify stakeholders' views on the management...

  10. Dissemination Package for Transition into Electronics (TIE) Project, October 1979-June 1980.

    ERIC Educational Resources Information Center

    Evergreen Valley Coll., San Jose, CA.

    This dissemination package consists of a variety of advertising materials, forms, questionnaires, tests, and handouts developed as a part of the Transition into Electronics (TIE) Project. (The TIE Project was a project that developed, implemented, and evaluated a model designed to encourage persons to pursue education and training leading to…

  11. Involvement of Students with Disabilities in the New American Schools Development Corporation Projects. Project FORUM.

    ERIC Educational Resources Information Center

    Ahearn, Eileen M.

    This study examined the involvement of students with disabilities in the New American Schools Development Corporation (NASDC) projects. The report begins with a description of the competition to select demonstration projects that would create teams to design, implement, and disseminate "break-the-mold" schools to bring about educational…

  12. MSFC Technology Year in Review 2015

    NASA Technical Reports Server (NTRS)

    Reynolds, David; Tinker, Mike

    2015-01-01

    MSFC has a strong diverse portfolio of technology development projects, ranging from flight projects to very low Technology Readiness Level (TRL) laboratory projects. The 2015 Year in Review highlights the Center's technology projects and celebrates their accomplishments to raise awareness of technology development work that is integral to the success of future Agency flight programs.

  13. Youth Development Project: First Year Evaluation Report [1984-85]. Report No. 321.

    ERIC Educational Resources Information Center

    Hawaii Univ., Manoa. Youth Development & Research Center.

    The Youth Development Project is a school-based delinquency prevention project which incorporates intervention strategies of social skills training, student team learning, and community liaison between home and school. Subjects in the project are fourth, fifth, and sixth graders of one experimental (N=315) and one comparison (N=196) elementary…

  14. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Acquisition and Easements, Hydraulics and Hydrology, Water Rights, Project Features and Design, Power... Federal water resource projects, Reclamation will consider proposals for non-Federal development of... part of the Klamath Project, the United States constructed A, B, and C-Canals, which carry water south...

  15. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate conveyance. Project-related planning costs outlined in § 64.9(a)(3), may be incurred prior to...) Construction costs associated with developing the right-of-way for recreation use. (3) Project-related planning required for the acquisition, development and use of the abandoned rights-of-way including master planning...

  16. Building Geographic Information System Capacity in Local Health Departments: Lessons From a North Carolina Project

    PubMed Central

    Miranda, Marie Lynn; Silva, Jennifer M.; Overstreet Galeano, M. Alicia; Brown, Jeffrey P.; Campbell, Douglas S.; Coley, Evelyn; Cowan, Christopher S.; Harvell, Dianne; Lassiter, Jenny; Parks, Jerry L.; Sandelé, Wanda

    2005-01-01

    State government, university, and local health department (LHD) partners collaborated to build the geographic information system (GIS) capacity of 5 LHDs in North Carolina. Project elements included procuring hardware and software, conducting individualized and group training, developing data layers, guiding the project development process, coordinating participation in technical conferences, providing ongoing project consultation, and evaluating project milestones. The project provided health department personnel with the skills and resources required to use sophisticated information management systems, particularly those that address spatial dimensions of public health practice. This capacity-building project helped LHDs incorporate GIS technology into daily operations, resulting in improved time and cost efficiency. Keys to success included (1) methods training rooted in problems specific to the LHD, (2) required project identification by LHD staff with associated timelines for development, (3) ongoing technical support as staff returned to home offices after training, (4) subgrants to LHDs to ease hardware and software resource constraints, (5) networks of relationships among LHDs and other professional GIS users, and (6) senior LHD leadership who supported the professional development activities being undertaken by staff. PMID:16257950

  17. Using computer software to improve group decision-making.

    PubMed

    Mockler, R J; Dologite, D G

    1991-08-01

    This article provides a review of some of the work done in the area of knowledge-based systems for strategic planning. Since 1985, with the founding of the Center for Knowledge-based Systems for Business Management, the project has focused on developing knowledge-based systems (KBS) based on these models. In addition, the project also involves developing a variety of computer and non-computer methods and techniques for assisting both technical and non-technical managers and individuals to do decision modelling and KBS development. This paper presents a summary of one segment of the project: a description of integrative groupware useful in strategic planning. The work described here is part of an ongoing research project. As part of this project, for example, over 200 non-technical and technical business managers, most of them working full-time during the project, developed over 160 KBS prototype systems in conjunction with MBA course in strategic planning and management decision making. Based on replies to a survey of this test group, 28 per cent of the survey respondents reported their KBS were used at work, 21 per cent reportedly received promotions, pay rises or new jobs based on their KBS development work, and 12 per cent reported their work led to participation in other KBS development projects at work. All but two of the survey respondents reported that their work on the KBS development project led to a substantial increase in their job knowledge or performance.

  18. Contribution of the Japan International Cooperation Agency health-related projects to health system strengthening.

    PubMed

    Yuasa, Motoyuki; Yamaguchi, Yoshie; Imada, Mihoko

    2013-09-22

    The Japan International Cooperation Agency (JICA) has focused its attention on appraising health development assistance projects and redirecting efforts towards health system strengthening. This study aimed to describe the type of project and targets of interest, and assess the contribution of JICA health-related projects to strengthening health systems worldwide. We collected a web-based Project Design Matrix (PDM) of 105 JICA projects implemented between January 2005 and December 2009. We developed an analytical matrix based on the World Health Organization (WHO) health system framework to examine the PDM data and thereby assess the projects' contributions to health system strengthening. The majority of JICA projects had prioritized workforce development, and improvements in governance and service delivery. Conversely, there was little assistance for finance or medical product development. The vast majority (87.6%) of JICA projects addressed public health issues, for example programs to improve maternal and child health, and the prevention and treatment of infectious diseases such as AIDS, tuberculosis and malaria. Nearly 90% of JICA technical healthcare assistance directly focused on improving governance as the most critical means of accomplishing its goals. Our study confirmed that JICA projects met the goals of bilateral cooperation by developing workforce capacity and governance. Nevertheless, our findings suggest that JICA assistance could be used to support financial aspects of healthcare systems, which is an area of increasing concern. We also showed that the analytical matrix methodology is an effective means of examining the component of health system strengthening to which the activity and output of a project contributes. This may help policy makers and practitioners focus future projects on priority areas.

  19. The state and profile of open source software projects in health and medical informatics.

    PubMed

    Janamanchi, Balaji; Katsamakas, Evangelos; Raghupathi, Wullianallur; Gao, Wei

    2009-07-01

    Little has been published about the application profiles and development patterns of open source software (OSS) in health and medical informatics. This study explores these issues with an analysis of health and medical informatics related OSS projects on SourceForge, a large repository of open source projects. A search was conducted on the SourceForge website during the period from May 1 to 15, 2007, to identify health and medical informatics OSS projects. This search resulted in a sample of 174 projects. A Java-based parser was written to extract data for several of the key variables of each project. Several visually descriptive statistics were generated to analyze the profiles of the OSS projects. Many of the projects have sponsors, implying a growing interest in OSS among organizations. Sponsorship, we discovered, has a significant impact on project success metrics. Nearly two-thirds of the projects have a restrictive license type. Restrictive licensing may indicate tighter control over the development process. Our sample includes a wide range of projects that are at various stages of development (status). Projects targeted towards the advanced end user are primarily focused on bio-informatics, data formats, database and medical science applications. We conclude that there exists an active and thriving OSS development community that is focusing on health and medical informatics. A wide range of OSS applications are in development, from bio-informatics to hospital information systems. A profile of OSS in health and medical informatics emerges that is distinct and unique to the health care field. Future research can focus on OSS acceptance and diffusion and impact on cost, efficiency and quality of health care.

  20. Concentrating Solar Power Projects - Termesol 50 | Concentrating Solar

    Science.gov Websites

    . Status Date: March 20, 2017 Project Overview Project Name: Termesol 50 (Valle 2) Country: Spain Location &M Jobs: 45 PPA/Tariff Date: January 1, 2010 Participants Developer(s): Torresol Owner(s

  1. Quality Assurance Project Plan Development Tool

    EPA Pesticide Factsheets

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  2. Technology Base Research Project for electrochemical energy storage

    NASA Astrophysics Data System (ADS)

    Kinoshita, K.

    1985-06-01

    The DOE Electrochemical Energy Storage Program is divided into two projects: (1) the exploratory technology development and testing (ETD) project and (2) the technology base research (TBR) project. The role of the TBR Project is to perform supporting research for the advanced battery systems under development by the ETD Project, and to evaluate new systems with potentially superior performance, durability and/or cost characteristics. The specific goal of the TBR Project is to identify the most promising electrochemical technologies and transfer them to industry and/or the ETD Project for further development and scale-up. This report summarizes the research, financial, and management activities relevant to the TBR Project in CY 1984. General problem areas addressed by the project include identification of new electrochemical couples for advanced batteries, determination of technical feasibility of the new couples, improvements in battery components and materials, establishment of engineering principles applicable to electrochemical energy storage and conversion, and the assessment of fuel-cell technology for transportation applications. Major emphasis is given to applied research which will lead to superior performance and lower life-cycle costs. The TBR Project is divided into three major project elements: exploratory research, applied science research, and air systems research.

  3. Onshore and Offshore Outsourcing with Agility: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Kussmaul, Clifton

    This chapter reflects on case study based an agile distributed project that ran for approximately three years (from spring 2003 to spring 2006). The project involved (a) a customer organization with key personnel distributed across the US, developing an application with rapidly changing requirements; (b) onshore consultants with expertise in project management, development processes, offshoring, and relevant technologies; and (c) an external offsite development team in a CMM-5 organization in southern India. This chapter is based on surveys and discussions with multiple participants. The several years since the project was completed allow greater perspective on both the strengths and weaknesses, since the participants can reflect on the entire life of the project, and compare it to subsequent experiences. Our findings emphasize the potential for agile project management in distributed software development, and the importance of people and interactions, taking many small steps to find and correct errors, and matching the structures of the project and product to support implementation of agility.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Upchurch, J.L.

    In order to better meet the challenges associated with downsizing and because of the ongoing need to control costs and accelerate project development many companies are trying new and different strategies in managing projects. For the Seastar Project, Phillips adopted a total team approach. The goal of this approach was to develop a win/win attitude for all of the personnel (Phillips, Engineering Contractor and Equipment Vendors) involved in the project. By bringing all the personnel together and focusing on project success it was thought that costs could be better controlled and that the development schedule could be accelerated. The Seastarmore » Project is a two well subsea development located in Garden Banks Blocks 70 and 71 approximately 120 miles south of Cameron Louisiana. Phillips took over operatorship in 1992 and drilled Garden Banks Block 71 No. 2, which discovered 349 feet of net gas pay in April 1993. Following a successful drill stem test on GB 71 No. 2, drilling was started on an appraisal well and work began on a feasibility study to define development options.« less

  5. Manager's handbook for software development, revision 1

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

  6. Processes and process development in Taiwan

    NASA Technical Reports Server (NTRS)

    Hwang, H. L.

    1986-01-01

    Silicon material research in the Republic of China (ROC) parallels its development in the electronic industry. A brief outline of the historical development in ROC silicon material research is given. Emphasis is placed on the recent Silane Project managed by the National Science Council, ROC, including project objectives, task forces, and recent accomplishments. An introduction is also given to industrialization of the key technologies developed in this project.

  7. Conceptions of Software Development by Project Managers: A Study of Managing the Outsourced Development of Software Applications for United States Federal Government Agencies

    ERIC Educational Resources Information Center

    Eisen, Daniel

    2013-01-01

    This study explores how project managers, working for private federal IT contractors, experience and understand managing the development of software applications for U.S. federal government agencies. Very little is known about how they manage their projects in this challenging environment. Software development is a complex task and only grows in…

  8. Instructional Systems Development Model for Interactive Videodisc. Final Report.

    ERIC Educational Resources Information Center

    Campbell, J. Olin; And Others

    This third and final report on a 3-year project, which developed authoring and production procedures for interactive videodisc based on the Interservice Procedures for Instructional Systems Development (IPISD), reviews the current state of the art, provides an overview of the project, and describes two videodiscs made for the project and the…

  9. Georgia Vocational Student Assessment Project. Final Report.

    ERIC Educational Resources Information Center

    Vocational Technical Education Consortium of States, Atlanta, GA.

    A project was conducted to develop vocational education tests for use in Georgia secondary schools, specifically for welding, machine shop, and sheet metal courses. The project team developed an outline of an assessment model that included the following components: (1) select a program for use in developing test items; (2) verify duties, tasks,…

  10. Implementing Small Scale ICT Projects in Developing Countries--How Challenging Is It?

    ERIC Educational Resources Information Center

    Karunaratne, Thashmee; Peiris, Colombage; Hansson, Henrik

    2018-01-01

    This paper summarises experiences of efforts made by twenty individuals when implementing small-scale ICT development projects in their organizations located in seven developing countries. The main focus of these projects was the use of ICT in educational settings. Challenges encountered and the contributing factors for implementation success of…

  11. Youth Leadership Development through School-Based Civic Engagement Activities: A Case Study

    ERIC Educational Resources Information Center

    Horstmeier, Robin Peiter; Ricketts, Kristina G.

    2009-01-01

    Leadership development through a civic engagement activity in a local FFA chapter is explored. Through a case study design, researchers illuminate a project that encouraged youth leadership development through the creation and execution of a civic engagement project in their own local community. Holistically, FFA members viewed the project as a…

  12. 31 CFR 537.413 - Sale of interest in economic development projects in Burma.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 3 2011-07-01 2011-07-01 false Sale of interest in economic development projects in Burma. 537.413 Section 537.413 Money and Finance: Treasury Regulations Relating to... SANCTIONS REGULATIONS Interpretations § 537.413 Sale of interest in economic development projects in Burma...

  13. Achievement Motivation Development Project. Final Report. Appendix IV, Part 2.

    ERIC Educational Resources Information Center

    McClelland, David C.; Alschuler, Alfred S.

    The Achievement Motivation Development Project is described. The Project has culminated in the development of course materials designed explicitly to promote aspects of psychological growth. As such, it is viewed as but one thrust in an emerging psychological education movement. Achievement motivation is defined as a way of planning, a set of…

  14. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  15. A School-Community Career Education Project. Final Report.

    ERIC Educational Resources Information Center

    Opelika City Schools, AL.

    The 3-year Opelika City (Alabama) School-Community Career Education Project sought to make career education central and not just an adjunct to the education program in Opelika schools. Development of the project was carried out through four phases: (1) Staff training and development, (2) curriculum development and revisions, (3) guidance, and (4)…

  16. Active Learning through Role Playing: Virtual Babies in a Child Development Course

    ERIC Educational Resources Information Center

    Poling, Devereaux A.; Hupp, Julie M.

    2009-01-01

    The authors designed an active learning project for a child development course in which students apply core concepts to a hypothetical baby they "raise" during the term. Students applied developmental topics to their unique, developing child. The project fostered student learning and enthusiasm for the material. The project's versatility makes it…

  17. Task Analysis and Job Descriptions for Robotics/Automated Systems Technicians. Final Report. Volume 1.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lovett, James E.

    The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…

  18. 31 CFR 537.413 - Sale of interest in economic development projects in Burma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SANCTIONS REGULATIONS Interpretations § 537.413 Sale of interest in economic development projects in Burma... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Sale of interest in economic development projects in Burma. 537.413 Section 537.413 Money and Finance: Treasury Regulations Relating to...

  19. The Non-Institutionalization of the Use of Self-Instructional Materials in Primary Schools in Jamaica: The Case of Project PRIMER.

    ERIC Educational Resources Information Center

    Jennings, Zellynne

    1993-01-01

    Asserts that many educational innovations introduced into developing nations from developed nations fail. Describes a project utilizing community involvement and individualized instruction that was introduced into Jamaica after successful development and implementation in the Philippines. Concludes that the project failed. (CFR)

  20. Large resource development projects as markets for passive solar technologies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roze-Benson, R V

    1980-12-01

    A basic premise of this study is that large resource development projects provide a major market opportunity for passive solar manufactured buildings. The primary objectives of the work are to document selected resource development projects and identify their potential housing needs and development schedules, to contact resource industry representatives and assess some of the processes and motivations behind their involvement in housing decisions, and to provide passive solar manufactured buildings producers with results of these steps as early initial market intelligence. The intent is to identify not only the industries, location of their planned projects, and their likely worker housingmore » needs, but also the individuals involved in making housing-related decisions. The 56 identified projects are located within 18 states and cover 11 types of resources. The report documents individual projects, provides protections of total worker-related housing needs, and presents overviews of resource development company involvement in the new construction market. In addition, the report profiles three organizations that expressed a strong interest in implementing the use of low-cost passive solar manufactured buildings in resource-development-related activities.« less

  1. Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Stanley; Patrick Gonzalez; Sandra Brown

    2005-10-01

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st , 2005 and June 30th, 2005. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less

  2. Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Stanley; Patrick Gonzalez; Sandra Brown

    2006-01-01

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st , 2005 and June 30th, 2005. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less

  3. A Review of Wind Project Financing Structures in the USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolinger, Mark A; Harper, John; Karcher, Matthew

    2008-09-24

    The rapid pace of wind power development in the U.S. over the last decade has outstripped the ability of most project developers to provide adequate equity capital and make efficient use of project-related tax benefits. In response, the sector has created novel project financing structures that feature varying combinations of equity capital from project developers and third-party tax-oriented investors, and in some cases commercial debt. While their origins stem from variations in the financial capacity and business objectives of wind project developers, as well as the risk tolerances and objectives of equity and debt providers, each structure is, at itsmore » core, designed to manage project risk and allocate federal tax incentives to those entities that can use them most efficiently. This article surveys the six principal financing structures through which most new utility-scale wind projects (excluding utility-owned projects) in the U.S. have been financed from 1999 to the present. These structures include simple balance-sheet finance, several varieties of all-equity special allocation partnership 'flip' structures, and two leveraged structures. In addition to describing each structure's mechanics, the article also discusses its rationale for use, the types of investors that find it appealing and why, and its relative frequency of use in the market. The article concludes with a generalized summary of how a developer might choose one structure over another.« less

  4. The GEOFAR Project - Geothermal Finance and Awareness in Europeans Regions - Development of new schemes to overcome non-technical barriers, focusing particularly on financial barriers

    NASA Astrophysics Data System (ADS)

    Poux, Adeline; Wendel, Marco; Jaudin, Florence; Hiegl, Mathias

    2010-05-01

    Numerous advantages of geothermal energy like its widespread distribution, a base-load power and availability higher than 90%, a small footprint and low carbon emissions, and the growing concerns about climate changes strongly promote the development of geothermal projects. Geothermal energy as a local energy source implies needs on surface to be located close to the geothermal resource. Many European regions dispose of a good geothermal potential but it is mostly not sufficiently developed due to non-technical barriers occurring at the very early stages of the project. The GEOFAR Project carried out within the framework of EU's "Intelligent Energy Europe" (IEE) program, gathers a consortium of European partners from Germany, France, Greece, Spain and Portugal. Launched in September 2008, the aim of this research project is to analyze the mentioned non-technical barriers, focusing most particularly on economic and financial aspects. Based on this analysis GEOFAR aims at developing new financial and administrative schemes to overcome the main financial barriers for deep geothermal projects (for electricity and direct use, without heat pumps). The analysis of the current situation and the future development of geothermal energy in GEOFAR target countries (Germany, France, Greece, Spain, Portugal, Slovakia, Bulgaria and Hungary) was necessary to understand and expose the diverging status of the geothermal sector and the more and less complicated situation for geothermal projects in different Europeans Regions. A deeper analysis of 40 cases studies (operating, planned and failed projects) of deep geothermal projects also contributed to this detailed view. An exhaustive analysis and description of financial mechanisms already existing in different European countries and at European level to support investors completed the research on non-technical barriers. Based on this profound analysis, the GEOFAR project has made an overview of the difficulties met by project planners, developers and politicians when developing a new geothermal project. Each of the analyzed countries is facing a distinct bundle of non-technical barriers. Globally, deep geothermal projects are characterized by high up-front costs and are facing the geological risk of the non discovery of the resources in adequacy to the initial expectations. Moreover, investors are facing directly the competitiveness of fossils energy. The very long pay back period makes it also difficult for them to face the geological risk. GEOFAR will propose new targeting financing and funding schemes, in order to remove the financial barriers hindering the initial stages of geothermal energy projects. GEOFAR also considers a lack of awareness as important barrier hindering the future development of geothermal energy projects. Public opinion is globally positive to geothermal energy, but deep geothermal projects are often suffering from a lack of information leading sometimes to non public acceptance. By underlining the range of possibilities offered by the geothermal energy and the potential and emerging technologies, GEOFAR tends to increase the awareness of geothermal energy in order to boost the development and the investment in new geothermal energy projects. Geothermal energy is expected to contribute significantly to the future European energy sources and the GEOFAR project aims to facilitate it.

  5. Quantifying economic benefits for rail infrastructure projects.

    DOT National Transportation Integrated Search

    2014-10-01

    This project identifies metrics for measuring the benefit of rail infrastructure projects for key : stakeholders. It is important that stakeholders with an interest in community economic development play an active : role in the development of the rai...

  6. Prototype development and demonstration for integrated dynamic transit operations.

    DOT National Transportation Integrated Search

    2016-01-01

    This document serves as the Final Report specific to the Integrated Dynamic Transit Operations (IDTO) Prototype Development and Deployment Project, hereafter referred to as IDTO Prototype Deployment or IDTO PD project. This project was performed unde...

  7. Streamlining project delivery through risk analysis.

    DOT National Transportation Integrated Search

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  8. Climate Ready Estuaries Partner Projects Map

    EPA Pesticide Factsheets

    CRE partners with the National Estuary Program to develop climate change projects in coastal U.S. areas, such as bays and harbors; to develop adaptation action plans, identify climate impacts and indicators, and more. This map shows project locations.

  9. Methods to achieve accurate projection of regional and global raster databases

    USGS Publications Warehouse

    Usery, E.L.; Seong, J.C.; Steinwand, D.R.; Finn, M.P.

    2002-01-01

    This research aims at building a decision support system (DSS) for selecting an optimum projection considering various factors, such as pixel size, areal extent, number of categories, spatial pattern of categories, resampling methods, and error correction methods. Specifically, this research will investigate three goals theoretically and empirically and, using the already developed empirical base of knowledge with these results, develop an expert system for map projection of raster data for regional and global database modeling. The three theoretical goals are as follows: (1) The development of a dynamic projection that adjusts projection formulas for latitude on the basis of raster cell size to maintain equal-sized cells. (2) The investigation of the relationships between the raster representation and the distortion of features, number of categories, and spatial pattern. (3) The development of an error correction and resampling procedure that is based on error analysis of raster projection.

  10. GCS plan for software aspects of certification

    NASA Technical Reports Server (NTRS)

    Shagnea, Anita M.; Lowman, Douglas S.; Withers, B. Edward

    1990-01-01

    As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.

  11. Reengineering the Project Design Process

    NASA Technical Reports Server (NTRS)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  12. Computerized adaptive control weld skate with CCTV weld guidance project

    NASA Technical Reports Server (NTRS)

    Wall, W. A.

    1976-01-01

    This report summarizes progress of the automatic computerized weld skate development portion of the Computerized Weld Skate with Closed Circuit Television (CCTV) Arc Guidance Project. The main goal of the project is to develop an automatic welding skate demonstration model equipped with CCTV weld guidance. The three main goals of the overall project are to: (1) develop a demonstration model computerized weld skate system, (2) develop a demonstration model automatic CCTV guidance system, and (3) integrate the two systems into a demonstration model of computerized weld skate with CCTV weld guidance for welding contoured parts.

  13. Implementation of a production Ada project: The GRODY study

    NASA Technical Reports Server (NTRS)

    Godfrey, Sara; Brophy, Carolyn Elizabeth

    1989-01-01

    The use of the Ada language and design methodologies that encourage full use of its capabilities have a strong impact on all phases of the software development project life cycle. At the National Aeronautics and Space Administration/Goddard Space Flight Center (NASA/GSFC), the Software Engineering Laboratory (SEL) conducted an experiment in parallel development of two flight dynamics systems in FORTRAN and Ada. The differences observed during the implementation, unit testing, and integration phases of the two projects are described and the lessons learned during the implementation phase of the Ada development are outlined. Included are recommendations for future Ada development projects.

  14. Selection of priority investment projects for the development of the Russian Arctic

    NASA Astrophysics Data System (ADS)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is innovative. Indigenous people's expert assessments of the priority of projects are processed using the hierarchy analysis method to determine the coefficients of the optimization model that enables the calculation of the choice between the analyzed projects, given the allocated financial resources. This approach can be used to address issues of support for indigenous people in areas where mining and other economic development activities are taking place, especially in the Arctic region. The proposed decision-making mechanism, which includes public hearings, sociological surveys, ethnological expertise, and compensation payments to indigenous minorities of the North, facilitates the justification of optimal strategies for maintaining and developing the region, taking into account economic, ecological, social, and ethnological factors.

  15. Using Scrum Practices in GSD Projects

    NASA Astrophysics Data System (ADS)

    Paasivaara, Maria; Lassenius, Casper

    In this chapter we present advice for applying Scrum practices to globally distributed software development projects. The chapter is based on a multiple-case study of four distributed Scrum projects. We discuss the use of distributed daily Scrums, Scrum-of-Scrums, Sprints, Sprint planning meetings, Sprint Demos, Retrospective meetings, and Backlogs. Moreover, we present lessons that distributed Scrum projects can benefit from non-agile globally distributed software development projects: frequent visits and multiple communication modes.

  16. Financial Management: Development and Management of the Army Game Project

    DTIC Science & Technology

    2005-08-24

    Financial Management Department of Defense Office of Inspector General August 24, 2005 Development and Management of the Army Game Project (D-2005...Management of the Army Game Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704 Acronyms AGP Army Game Project FMR

  17. Intersections: A Professional Development Project in Multicultural and Global Education, Asian and Asian American Studies.

    ERIC Educational Resources Information Center

    Swartz, Leslie, Ed.; Warner, Linda, Ed.; Grossman, David L., Ed.

    This publication presents a sampling of the writings of participants in the Intersections Project, a professional development program to bridge gap between multicultural and global education for urban schools that involved four participating entities, each with a local project that focused on Asia and Asian Americans. The project was specifically…

  18. DEVELOPING AND IMPLEMENTING A LEAD DUST MONITORING, OUTREACH AND EDUCATION PROGRAM IN YOUR COMMUNITY/SYRACUSE LEAD DUST PROJECT

    EPA Science Inventory

    EPA has developed a technology transfer document (case-study) for the EMPACT Syracuse Lead Dust Project. The Lead Dust Project is designed to measure the lead dust content in homes and public buildings within the City of Syracuse, NY. The project also contains an educational comp...

  19. Using a Dual Role Assignment to Improve Group Dynamics and Performance: The Effects of Facilitating Social Capital in Teams

    ERIC Educational Resources Information Center

    Aquino, Karl; Serva, Mark A.

    2005-01-01

    This article describes a project that simulates the interplay between management and development project teams in a business environment. Each student team was assigned a management role supervising one project and a development role implementing another project. Results indicate that teams that communicate regularly and interact socially outside…

  20. A Directory of Research and Curriculum Development Projects in Social Science Education.

    ERIC Educational Resources Information Center

    Lester, Sid; And Others

    This directory is designed as a reference for the educator on the activities of the new social studies research and curriculum development projects. It is not an analysis or an evaluation; it merely reports the information supplied by the 100 various projects --name, director, address, purpose, grade, subject, and products. These projects cover…

  1. Success Rates by Software Development Methodology in Information Technology Project Management: A Quantitative Analysis

    ERIC Educational Resources Information Center

    Wright, Gerald P.

    2013-01-01

    Despite over half a century of Project Management research, project success rates are still too low. Organizations spend a tremendous amount of valuable resources on Information Technology projects and seek to maximize the utility gained from their efforts. The author investigated the impact of software development methodology choice on ten…

  2. Developing Communities of Practice around e-Learning and Project Management

    ERIC Educational Resources Information Center

    Laxton, Ruth; Applebee, Andrelyn Cheryl

    2010-01-01

    In 2007-8 the Australian Catholic University (ACU National), undertook a project to develop new resources to provide training and support in eLearning for staff and students. The project was undertaken by a multidisciplinary team drawn from all six campuses and was led by an externally contracted Project Manager/eLearning specialist. This…

  3. Comparison of Outcomes for Youth Apprenticeship Projects and Youth Career Development Projects. Supplementary Report.

    ERIC Educational Resources Information Center

    Richards, James M., Jr.; And Others

    The New Youth Initiatives in Apprenticeship Program (YAP) was compared with the Youth Career Development Program (YCD). Data for 1979 and 1980 came from an evaluation of YAP projects by CSR, Incorporated, and an evaluation of the YCD projects by the Educational Testing Service. A multiple regression approach was used to compare student…

  4. Applying Project Histories and Project Learning through Knowledge Management in an Australian Construction Company

    ERIC Educational Resources Information Center

    Maqsood, Tayyab; Finegan, Andrew; Walker, Derek

    2006-01-01

    Purpose: With the advent of information and communication technologies (ICT), some organisations have endeavoured to develop and maintain systems commonly known as project histories. This paper aims to provide a framework to the construction organisations in order to improve the learning from projects through the development and use of project…

  5. Implementing Projects in Calculus on a Large Scale at the University of South Florida

    ERIC Educational Resources Information Center

    Fox, Gordon A.; Campbell, Scott; Grinshpan, Arcadii; Xu, Xiaoying; Holcomb, John; Bénéteau, Catherine; Lewis, Jennifer E.; Ramachandran, Kandethody

    2017-01-01

    This paper describes the development of a program of project-based learning in Calculus courses at a large urban research university. In this program, students developed research projects in consultation with a faculty advisor in their major, and supervised by their calculus instructors. Students wrote up their projects in a prescribed format…

  6. Toward the Integration of Cultural Values and Alternative School Models: Challenges in Japan

    ERIC Educational Resources Information Center

    Chesky, Aimi Kono

    2013-01-01

    The project development school idea in Japan started in the late 1970s. Both public and private schools can become project schools. Public schools' districts and private schools' boards develop the project plan and submit the application to the Ministry of Education, Culture, Sports, Science and Technology (MEXT). Once approved, the project school…

  7. Staff Development for Vocational Education Teachers at the Mario Umana Harbor School of Science and Technology. Project STEP.

    ERIC Educational Resources Information Center

    Massachusetts Inst. of Tech., Cambridge.

    A staff development project to create closer integration and mutual support between specialized science and technology curricula and vocational education courses is described. Project activities are listed, and a statement of underlying assumptions is provided. A list of guidelines for coordinating shop and academic projects follows. Guidelines…

  8. Qualitative Phenomenological Examination of IT Project Management in Pharmaceutical Industry

    ERIC Educational Resources Information Center

    Ly, Phil

    2013-01-01

    The purpose of this study was to examine what caused IT projects to fail at a high rate in the pharmaceutical industry. IT projects failures delayed development of new drugs that can help save lives. It was imperative to evaluate what caused project failures because the collateral damage was delay in drug development. This qualitative…

  9. Guidelines for Development of a Home Industry. Appropriate Technologies for Development. Reprint R-14.

    ERIC Educational Resources Information Center

    Olcott, Lynn

    This booklet, prepared for the Peace Corps, describes the operation of the Volunteer Rehabilitation Project, a handicraft project for handicapped persons (mostly leprosy patients) in Ethiopia. Along with the project description are step-by-step instructions for carrying out a similar project and a discussion of the principles underlying the…

  10. Chapter 13 - Perspectives on LANDFIRE Prototype Project Accuracy Assessment

    Treesearch

    James Vogelmann; Zhiliang Zhu; Jay Kost; Brian Tolk; Donald Ohlen

    2006-01-01

    The purpose of this chapter is to provide a general overview of the many aspects of accuracy assessment pertinent to the Landscape Fire and Resource Management Planning Tools Prototype Project (LANDFIRE Prototype Project). The LANDFIRE Prototype formed a large and complex research and development project with many broad-scale data sets and products developed throughout...

  11. The Supervisor in the Project-Organized Group Work Should Participate in Developing the Students' Project Competencies

    ERIC Educational Resources Information Center

    Hansen, Soren

    2004-01-01

    Most work done by engineers today is organized in projects and very often as teamwork. When educating towards employability, it is therefore important that the students develop competencies in areas such as project management, collaboration and teamwork. In companies using human resource management, we find similar expectations to the engineers'…

  12. Patterns in Safety-Related Projects

    NASA Astrophysics Data System (ADS)

    Parsons, Mike; Hunter, Charles

    Within Logica UK, safety-related projects are run in a variety of ways depending on the constraints imposed and how the risks and mitigations are owned and handled. A total of eight different types of project development patterns have been identified and this paper discusses each type. A simple decision tool has been developed based on the patterns which is used as an aid in deciding how to bid a safety project, allowing tradeoffs between risk ownership, development methods and cost to be assessed.

  13. 34 CFR 646.30 - What are allowable costs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... participant development, project administration, or project recordkeeping. (g) Professional development travel... of the participants' academic progress and personal development. (e) Transportation and, with the...

  14. Change management methodologies trained for automotive infotainment projects

    NASA Astrophysics Data System (ADS)

    Prostean, G.; Volker, S.; Hutanu, A.

    2017-01-01

    An Automotive Electronic Control Units (ECU) development project embedded within a car Environment is constantly under attack of a continuous flow of modifications of specifications throughout the life cycle. Root causes for those modifications are for instance simply software or hardware implementation errors or requirement changes to satisfy the forthcoming demands of the market to ensure the later commercial success. It is unavoidable that from the very beginning until the end of the project “requirement changes” will “expose” the agreed objectives defined by contract specifications, which are product features, budget, schedule and quality. The key discussions will focus upon an automotive radio-navigation (infotainment) unit, which challenges aftermarket devises such as smart phones. This competition stresses especially current used automotive development processes, which are fit into a 4 Year car development (introduction) cycle against a one-year update cycle of a smart phone. The research will focus the investigation of possible impacts of changes during all phases of the project: the Concept-Validation, Development and Debugging-Phase. Building a thorough understanding of prospective threats is of paramount importance in order to establish the adequate project management process to handle requirement changes. Personal automotive development experiences and Literature review of change- and configuration management software development methodologies led the authors to new conceptual models, which integrates into the structure of traditional development models used in automotive projects, more concretely of radio-navigation projects.

  15. Project Notes

    ERIC Educational Resources Information Center

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  16. [Consequences of a Failed Project: Introduction and Management of a Hospitalization-Substituting Treatment Model].

    PubMed

    Peters, Uwe

    2018-01-01

    This article is a report on a psychiatric project introducing services that substitute in-patient treatment and a new control and management system. The implementation of the project was a failure. Nevertheless, the project has made a contribution to further development of community-based psychiatry. Design, organization and course of the project are described and analyzed from the point of view of the communal actors involved. Effects going beyond the time course of the project have been taken into consideration. The results show that the contracting authority, project developer and local actors involved had differing ideas on the weight attached to different parts of the project as well as on the project goal and resources for carrying out the project. © Georg Thieme Verlag KG Stuttgart · New York.

  17. The Conceptualization, Development and Implementation of a Comprehensive Guidance Model. [Georgia Comprehensive K-14 Career Guidance Project.] Final Report, July 1, 1975 through June 30, 1977.

    ERIC Educational Resources Information Center

    Vail, Paul

    A project was conducted to develop, test, and implement a comprehensive program for Georgia school systems, grades K-14. The target population included regular students, students with special needs, out-of-school youth, and adults experiencing career problems. Project objectives were to develop a K-14 guidance model, develop a state/local…

  18. NASA's Cryogenic Fluid Management Technology Project

    NASA Technical Reports Server (NTRS)

    Tramel, Terri L.; Motil, Susan M.

    2008-01-01

    The Cryogenic Fluid Management (CFM) Project's primary objective is to develop storage, transfer, and handling technologies for cryogens that will support the enabling of high performance cryogenic propulsion systems, lunar surface systems and economical ground operations. Such technologies can significantly reduce propellant launch mass and required on-orbit margins, reduce or even eliminate propellant tank fluid boil-off losses for long term missions, and simplify vehicle operations. This paper will present the status of the specific technologies that the CFM Project is developing. The two main areas of concentration are analysis models development and CFM hardware development. The project develops analysis tools and models based on thermodynamics, hydrodynamics, and existing flight/test data. These tools assist in the development of pressure/thermal control devices (such as the Thermodynamic Vent System (TVS), and Multi-layer insulation); with the ultimate goal being to develop a mature set of tools and models that can characterize the performance of the pressure/thermal control devices incorporated in the design of an entire CFM system with minimal cryogen loss. The project does hardware development and testing to verify our understanding of the physical principles involved, and to validate the performance of CFM components, subsystems and systems. This database provides information to anchor our analytical models. This paper describes some of the current activities of the NASA's Cryogenic Fluid Management Project.

  19. Alpha Project. Townsight Canada. Project Canada West.

    ERIC Educational Resources Information Center

    Western Curriculum Project on Canada Studies, Edmonton (Alberta).

    In order to acquaint students with other environments and to develop an awareness of their own community, the study of a small community in Canada was undertaken by this project development team. The Alpha students studied Chilliwack the first year (ED 066 352) and this second report covers their study of Powell River. The aim of the developers is…

  20. Education and Local Development in Australian Rural Areas. Research Study No. 74.

    ERIC Educational Resources Information Center

    Stoessiger, Rex

    The study provides an overview of the Education and Local Development (ELD) projects conducted in Western Australia, Victoria, New South Wales, and Tasmania as part of the OECD/CERI (Organisation for Economic Co-operation and Development/Centre for Educational Research and Innovation) project. The CERI ELD project was planned to investigate: the…

  1. Influence of 4-H Horse Project Involvement on Development of Life Skills

    ERIC Educational Resources Information Center

    Anderson, K. P.; Karr-Lilienthal, L.

    2011-01-01

    Four-H horse project members who competed in non-riding horse contests were surveyed to evaluate the influence of their horse project participation on life-skill development. Contests in which youth competed included Horse Bowl, Demonstrations, Public Speaking, and Art. Youth indicated a positive influence on both life-skill development and horse…

  2. A Professional Development Project for Improving the Use of Information and Communication Technologies in Science Teaching

    ERIC Educational Resources Information Center

    Lavonen, Jari; Juuti, Kalle; Aksela, Maija; Meisalo, Veijo

    2006-01-01

    This article describes a professional development project aiming to develop practical approaches for the integration of information and communication technologies (ICT) into science education. Altogether, 13 two-day face-to-face seminars and numerous computer network conferences were held during a three-year period. The goals for the project were…

  3. Adoption of ICT in Science Education: A Case Study of Communication Channels in a Teachers' Professional Development Project

    ERIC Educational Resources Information Center

    Juuti, Kalle; Lavonen, Jari; Aksela, Maija; Meisalo, Veijo

    2009-01-01

    This paper analyses the use of various communication channels in science teachers' professional development project aiming to develop versatile uses for ICT (Information and Communication Technologies) in science teaching. A teacher network was created specifically for this project, and the researchers facilitated three forms of communication…

  4. 24 CFR Appendix A to Part 570 - Guidelines and Objectives for Evaluating Project Costs and Financial Requirements

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... recipient with a framework for financially underwriting and selecting CDBG-assisted economic development... out the economic development project. This is to ensure that time and effort is not wasted on... review the economic development project to ensure that, to the extent practicable, CDBG funds will not be...

  5. 24 CFR Appendix A to Part 570 - Guidelines and Objectives for Evaluating Project Costs and Financial Requirements

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... recipient with a framework for financially underwriting and selecting CDBG-assisted economic development... out the economic development project. This is to ensure that time and effort is not wasted on... review the economic development project to ensure that, to the extent practicable, CDBG funds will not be...

  6. 24 CFR Appendix A to Part 570 - Guidelines and Objectives for Evaluating Project Costs and Financial Requirements

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... recipient with a framework for financially underwriting and selecting CDBG-assisted economic development... out the economic development project. This is to ensure that time and effort is not wasted on... review the economic development project to ensure that, to the extent practicable, CDBG funds will not be...

  7. 24 CFR Appendix A to Part 570 - Guidelines and Objectives for Evaluating Project Costs and Financial Requirements

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... recipient with a framework for financially underwriting and selecting CDBG-assisted economic development... out the economic development project. This is to ensure that time and effort is not wasted on... review the economic development project to ensure that, to the extent practicable, CDBG funds will not be...

  8. Promoting Sustainable Development through Whole School Approaches: An International, Intercultural Teacher Education Research and Development Project

    ERIC Educational Resources Information Center

    Shallcross, Tony; Loubser, Callie; Le Roux, Cheryl; O'Donoghue, Rob; Lupele, Justin

    2006-01-01

    This paper focuses on a British Council funded Higher Education Link project involving three institutions--Manchester Metropolitan University (MMU) in the UK and two South African institutions, the University of South Africa (UNISA) and Rhodes University. The link is a research and development project that has three main research strands:…

  9. Raising the Bar: Challenging Students in a Capstone Project Course with an Android and Mobile Web Parallel Development Team Project

    ERIC Educational Resources Information Center

    Wong, Wilson; Pepe, James; Englander, Irv

    2017-01-01

    Information systems capstone projects aim to prepare students for what they will encounter in the industry after graduation. Corporate application development is often a complex endeavor that requires coordination between related products. For example, software development in the mobile application sector may require a coordinated parallel…

  10. The Project Dimension in Community Education.

    ERIC Educational Resources Information Center

    Thompson, J. D. Ekundaye

    1994-01-01

    Describes three projects sponsored by the International Community Education Association: (1) functional literacy for railway workers in Ghana; (2) youth farmers' community development project in Ghana; and (3) participatory research in a community education and development network in Sierra Leone. (SK)

  11. Concentrating Solar Power Projects - Arcosol 50 | Concentrating Solar Power

    Science.gov Websites

    Date: March 20, 2017 Project Overview Project Name: Arcosol 50 (Valle 1) Country: Spain Location: San Annual O&M Jobs: 45 PPA/Tariff Date: January 1, 2010 Participants Developer(s): Torresol Owner(s

  12. Prototype road weather performance management tool : project report : draft report.

    DOT National Transportation Integrated Search

    2016-09-30

    This report is the Project Report for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Uses Connected Vehicle Data (RW-...

  13. Flat-plate solar array project. Volume 5: Process development

    NASA Technical Reports Server (NTRS)

    Gallagher, B.; Alexander, P.; Burger, D.

    1986-01-01

    The goal of the Process Development Area, as part of the Flat-Plate Solar Array (FSA) Project, was to develop and demonstrate solar cell fabrication and module assembly process technologies required to meet the cost, lifetime, production capacity, and performance goals of the FSA Project. R&D efforts expended by Government, Industry, and Universities in developing processes capable of meeting the projects goals during volume production conditions are summarized. The cost goals allocated for processing were demonstrated by small volume quantities that were extrapolated by cost analysis to large volume production. To provide proper focus and coverage of the process development effort, four separate technology sections are discussed: surface preparation, junction formation, metallization, and module assembly.

  14. NASA Work Breakdown Structure (WBS) Handbook

    NASA Technical Reports Server (NTRS)

    Terrell, Stefanie M.

    2018-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.

  15. Alternate electrode materials for the SP100 reactor

    NASA Astrophysics Data System (ADS)

    Randich, E.

    1992-05-01

    This work was performed in response to a request by the Astro-Space Division of the General Electric Co. to develop alternate electrodes materials for the electrodes of the PD2 modules to be used in the SP100 thermoelectric power conversion system. Initially, the project consisted of four tasks: (1) development of a ZrB2 (C) CVD coating on SiMo substrates; (2) development of a ZrB2 (C) CVD coating on SiGe substrates; (3) development of CVI W for porous graphite electrodes; and (4) technology transfer of pertinent developed processes. The project evolved initially into developing only ZrB2 coatings on SiGe and graphite substrates, and later into developing ZrB2 coatings only on graphite substrates. Several sizes of graphite and pyrolytic carbon-coated graphite substrates were coated with ZrB2 during the project. For budgetary reasons, the project was terminated after half the allotted time had passed. Apart from the production of coated specimens for evaluation, the major accomplishment of the project was the development of the CVD processing to produce the desired coatings.

  16. Contribution of the Japan International Cooperation Agency health-related projects to health system strengthening

    PubMed Central

    2013-01-01

    Background The Japan International Cooperation Agency (JICA) has focused its attention on appraising health development assistance projects and redirecting efforts towards health system strengthening. This study aimed to describe the type of project and targets of interest, and assess the contribution of JICA health-related projects to strengthening health systems worldwide. Methods We collected a web-based Project Design Matrix (PDM) of 105 JICA projects implemented between January 2005 and December 2009. We developed an analytical matrix based on the World Health Organization (WHO) health system framework to examine the PDM data and thereby assess the projects’ contributions to health system strengthening. Results The majority of JICA projects had prioritized workforce development, and improvements in governance and service delivery. Conversely, there was little assistance for finance or medical product development. The vast majority (87.6%) of JICA projects addressed public health issues, for example programs to improve maternal and child health, and the prevention and treatment of infectious diseases such as AIDS, tuberculosis and malaria. Nearly 90% of JICA technical healthcare assistance directly focused on improving governance as the most critical means of accomplishing its goals. Conclusions Our study confirmed that JICA projects met the goals of bilateral cooperation by developing workforce capacity and governance. Nevertheless, our findings suggest that JICA assistance could be used to support financial aspects of healthcare systems, which is an area of increasing concern. We also showed that the analytical matrix methodology is an effective means of examining the component of health system strengthening to which the activity and output of a project contributes. This may help policy makers and practitioners focus future projects on priority areas. PMID:24053583

  17. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    PubMed

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  18. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    PubMed

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  19. The book, the stories, the people: an ongoing dialogic narrative inquiry study combining a practice development project. Part 2: the practice development context.

    PubMed

    Grant, A; Biley, F C; Leigh-Phippard, H; Walker, H

    2012-12-01

    This paper is the second part of a two-article practice development report. It builds on the first part by introducing and discussing a Writing for Recovery practice development project, conducted at two UK sites. The paper begins by briefly describing the project within the context of helping mental health users, carers and survivors develop skills in creative writing in order to engage in the process of narrative re-storying in line with preferred identity. A selective overview of broad and focal background literature relevant to the project is then provided in order to position it within a values-based mental health nursing practice. Following this, the specific plan for running the project is briefly summarized, covering actual and anticipated ethical issues. The paper ends with a discussion of dissemination aims. © 2012 Blackwell Publishing.

  20. Examining Thai high school students' developing STEM projects

    NASA Astrophysics Data System (ADS)

    Teenoi, Kultida; Siripun, Kulpatsorn; Yuenyong, Chokchai

    2018-01-01

    Like others, Thailand education strongly focused on STEM education. This paper aimed to examine existing Thai high school students' integrated knowledge about science, technology, engineering, and mathematics (STEM) in their developing science project. The participants included 49 high school students were studying the subject of individual study (IS) in Khon Kaen wittayayon school, Khon Kaen, Thailand. The IS was provided to gradually enhance students to know how to do science project starting from getting start to do science projects, They enrolled to study the individual study of science project for three year in roll. Methodology was qualitative research. Views of students' integrated knowledge about STEM were interpreted through participant observation, interview, and students' science projects. The first author as participant observation has taught this group of students for 3 years. It found that 16 science projects were developed. Views of students' integrated knowledge about STEM could be categorized into three categories. These included (1) completely indicated integration of knowledge about science, technology, engineering, and mathematics, (2) partial indicated integration of knowledge about science, technology, engineering, and mathematics, and (3) no integration. The findings revealed that majority of science projects could be categorized as completely indicated integration of knowledge about science, technology, engineering, and mathematics. The paper suggested some ideas of enhancing students to applying STEM for developing science projects.

  1. South African CSP projects under the REIPPP programme - Requirements, challenges and opportunities

    NASA Astrophysics Data System (ADS)

    Relancio, Javier; Cuellar, Alberto; Walker, Gregg; Ettmayr, Chris

    2016-05-01

    Thus far seven Concentrated Solar Power (CSP) projects have been awarded under the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), totalling 600MW: one project is in operation, four under construction and two on their way to financial close. This provides an excellent opportunity for analysis of key features of the projects that have contributed to or detracted from the programme's success. The paper draws from Mott MacDonald's involvement as Technical Advisor on the seven CSP projects that have been successful under the REIPPPP to date as well as other global CSP developments. It presents how various programme requirements have affected the implementation of projects, such as the technical requirements, time of day tariff structure, economic development requirements and the renewable energy grid code. The increasingly competitive tariffs offered have encouraged developers to investigate efficiency maximising project configurations and cost saving mechanisms, as well as featuring state of the art technology in their proposals. The paper assesses the role of the project participants (developers, lenders and government) with regards to these innovative technologies and solutions. In our paper we discuss the status of projects and the SA market, analysing the main challenges and opportunities that in turn have influenced various aspects such as technology choice, operational regimes and supply chain arrangements.

  2. Systems Engineering in NASA's R&TD Programs

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    Systems engineering is largely the analysis and planning that support the design, development, and operation of systems. The most common application of systems engineering is in guiding systems development projects that use a phased process of requirements, specifications, design, and development. This paper investigates how systems engineering techniques should be applied in research and technology development programs for advanced space systems. These programs should include anticipatory engineering of future space flight systems and a project portfolio selection process, as well as systems engineering for multiple development projects.

  3. Water Resources Management in Turkey as a Case Study Southeastern Anatolia Project (gap)

    NASA Astrophysics Data System (ADS)

    Ačma, Bülent

    2010-05-01

    The Southeastern Anatolia Project (GAP), one of the most important projects for develop remarkable natural resources of the world, is accepted as a change for getting benefit from rich water and agricultural resources of the Southeastern Anatolia Region. The GAP Project has been considered as a regional development projects through years, but the dimensions of sustainability, protection of environment and participatory have been attached to the master of the project in recent years. When the GAP Project is completed, the Upper Mesopotomia, the centers of many civilisation, will re-again its importance as it had in the ancient times, and will be alive a center of civilisation. Moreover, when the problem of water shortage and water supplies in the world for the future is kept in mind, the importance of Southeastern Anatolia's water supplies will be doubled. For this reason, the GAP Project, developed by depending on water and natural resources of the region, will have an important place in the world. The aim of this study is to introduce the region with rich natural resources and the GAP Project. For this reason, firstly, the natural potential of the region will be introduced. Second, The GAP Project will be presented in detailes. In the third stage, the projects being processed for protecting the natural sources and environment will be analyzed. In the last stage, strategies and policies to develop and to protect the natural resources of the region in short, mid, and long terms will be proposed.

  4. Developing Government Renewable Energy Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewablemore » projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.« less

  5. Parametric Crowd Generation Software for MS&T Simulations and Training

    DTIC Science & Technology

    2007-02-20

    3 Technology Overview 5 Dynemotion System Components 5 Dynemotion System Architecture 6 Dynemotion-Enabled NPC Brain Cycles 9 Dynemotion API...Contents 10 Development Project Background Information 11 Potential Application and Impact for the DoD 13 Project Objectives, Scope...Methodology 13 Benefits of the Project 13 Project Innovation 14 *l_essons Learned and Open Questions 14 Research and Development Challenges 16

  6. Why Development Projects Don't Work as Planned: Pitfalls and "Solutions." Special Studies Series on Global Development No. 5.

    ERIC Educational Resources Information Center

    Lackey, Alvin S.

    Although this paper identifies the various reasons for project failure, it also highlights the principles and practices related to project success. The paper attempts to strike a positive note concerning steps to take to increase the probability of successful project implementation and to suggest more realistic attitudes and expectations toward…

  7. The Language Development Project; A Pilot Study in Language Learning. A New York State Urban Aid Project. End-Year Report, June 30, 1969.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY.

    The format of this report is similar to that of other reports on The Language Development Project. See AL 002 352 and 354 for descriptions of the project and the format of the reports. [Not available in hard copy due to marginal legibility of the original document.] (DO)

  8. Nuclear rocket propulsion technology - A joint NASA/DOE project

    NASA Technical Reports Server (NTRS)

    Clark, John S.

    1991-01-01

    NASA and the DOE have initiated critical technology development for nuclear rocket propulsion systems for SEI human and robotic missions to the moon and to Mars. The activities and project plan of the interagency project planning team in FY 1990 and 1991 are summarized. The project plan includes evolutionary technology development for both nuclear thermal and nuclear electric propulsion systems.

  9. Secretary's Discretionary Program: Planning Grant To Develop Teacher Incentive Projects. Final Report. Support for Innovative Teacher Projects.

    ERIC Educational Resources Information Center

    Gittman, Elizabeth; Gottlieb, Karen

    Support for Innovative Teacher Projects was a 12-month program implemented by the Board of Cooperative Education Services (BOCES) of Nassau County, New York, designed to encourage and assist teachers in developing innovative projects in priority areas and in applying for funding. In collaboration with a university school of education, the project…

  10. Language Development through Holistic Learning (Mathematics, Art, Science, Technology, and Education Resources). Project MASTER, 1988-89. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Barrera, Marbella

    In its fourth year, Project MASTER served 477 Spanish-speaking students in 5 elementary schools in the Bronx. The teaching strategy was holistic, integrating all aspects of the curriculum with English-language learning through science projects. The project developed curriculum materials, stressing attitudes toward and knowledge of science topics,…

  11. Mt. Druitt Early Childhood Project. Third, Fourth, and Fifth Annual Reports to Bernard Van Leer Foundation.

    ERIC Educational Resources Information Center

    Macquarie Univ., North Ryde (Australia). School of Education.

    This series of the third, fourth, and fifth annual reports to the Bernard Van Leer Foundation on the Mt. Druitt Early Childhood Project of Macquarie University, Australia, describes the general activities, program developments, and research activities of the project for the period 1977-1979. The main objective of the project is to develop,…

  12. Cooperative and Context-Based Learning on Eletrochemical Cells in Lower Secondary Chemistry: A Project of Participatory Action Research

    ERIC Educational Resources Information Center

    Markic, Silvija; Eilks, Ingo

    2006-01-01

    This paper discusses a project of Participatory Action Research (PAR) on lower secondary chemistry education. In this ongoing project, practicing teachers and university researchers in chemical education jointly carry out projects for developing and evaluating new lesson plans. The focus of the PAR group is to develop teaching/learning activities…

  13. "2+2" Articulated Health Occupations Project. Nursing Program. Second Year Final Report.

    ERIC Educational Resources Information Center

    Paris Independent School District, TX.

    A project was conducted to develop a 2 + 2 articulated training program in health careers to link the last 2 years of secondary and the first 2 years of postsecondary training. During the second year of the secondary project, the first year of training was implemented and the model program was further developed and refined. Project tasks included…

  14. 36 CFR 328.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Parks, Forests, and Public Property CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY REGULATION OF SEAPLANE OPERATIONS AT CIVIL WORKS WATER RESOURCE DEVELOPMENT PROJECTS ADMINISTERED BY THE CHIEF OF ENGINEERS § 328.1... projects means water resources development projects administered by the Chief of Engineers. ...

  15. Commitment of project participants to developing health care services based on the internet technology.

    PubMed

    Kouri, Pirkko; Karjalainen-Jurvelin, Ritva; Kinnunen, Juha

    2005-12-01

    When developing Information and Communication Technology (ICT), such as services for the decision-making process, skilled health care professionals with their comprehensive knowledge of patients/clients are essential contributors to the project. Careful evaluation is needed to assess the effectiveness of project management as well as to analyze the commitment of the personnel to goal attainment. In the course of the development of integrated maternity care services, the commitment of project participants (n=48) was evaluated. What factors enhanced or impaired their commitment to the project work? Questionnaire (n=80, response rate 60%) with quantitative analysis as well as open-ended questions with qualitative content analysis. Positive commitment was related to a confidential and open atmosphere during the project. The utilization of personal skills and experience was appreciated. Differences in the working principles and cultures between the participating organizations complicated fluent collaboration. To encourage commitment, a lot of attention should be paid to internal communication as well as the effective realization of project tasks. The strength of the project was the highly innovative and confidential atmosphere. The well-established project goals, the highly inspired project team, and the effective co-operation between the project manager and the core group helped to deepen overall commitment in the project.

  16. Guidance and Control Software Project Data - Volume 2: Development Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  17. Technical Progress Report on Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Stanley; Patrick Gonzalez; Sandra Brown

    2006-06-30

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st and July 30th 2006. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. Work is being carried out in Brazil, Belize, Chile, Peru and the USA.« less

  18. Review of NASA's Hypersonic Research Engine Project

    NASA Technical Reports Server (NTRS)

    Andrews, Earl H.; Mackley, Ernest A.

    1993-01-01

    The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.

  19. The DEVELOP National Program's Strategy for Communicating Applied Science Outcomes

    NASA Astrophysics Data System (ADS)

    Childs-Gleason, L. M.; Ross, K. W.; Crepps, G.; Favors, J.; Kelley, C.; Miller, T. N.; Allsbrook, K. N.; Rogers, L.; Ruiz, M. L.

    2016-12-01

    NASA's DEVELOP National Program conducts rapid feasibility projects that enable the future workforce and current decision makers to collaborate and build capacity to use Earth science data to enhance environmental management and policy. The program communicates its results and applications to a broad spectrum of audiences through a variety of methods: "virtual poster sessions" that engage the general public through short project videos and interactive dialogue periods, a "Campus Ambassador Corps" that communicates about the program and its projects to academia, scientific and policy conference presentations, community engagement activities and end-of-project presentations, project "hand-offs" providing results and tools to project partners, traditional publications (both gray literature and peer-reviewed), an interactive website project gallery, targeted brochures, and through multiple social media venues and campaigns. This presentation will describe the various methods employed by DEVELOP to communicate the program's scientific outputs, target audiences, general statistics, community response and best practices.

  20. Development of Risk Uncertainty Factors from Historical NASA Projects

    NASA Technical Reports Server (NTRS)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  1. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    NASA Technical Reports Server (NTRS)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  2. NASA's Hypersonic Research Engine Project: A review

    NASA Technical Reports Server (NTRS)

    Andrews, Earl H.; Mackley, Ernest A.

    1994-01-01

    The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.

  3. Composting projects under the Clean Development Mechanism: Sustainable contribution to mitigate climate change

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rogger, Cyrill; Beaurain, Francois; Schmidt, Tobias S., E-mail: tobiasschmidt@ethz.ch

    2011-01-15

    The Clean Development Mechanism (CDM) of the Kyoto Protocol aims to reduce greenhouse gas emissions in developing countries and at the same time to assist these countries in sustainable development. While composting as a suitable mitigation option in the waste sector can clearly contribute to the former goal there are indications that high rents can also be achieved regarding the latter. In this article composting is compared with other CDM project types inside and outside the waste sector with regards to both project numbers and contribution to sustainable development. It is found that, despite the high number of waste projects,more » composting is underrepresented and a major reason for this fact is identified. Based on a multi-criteria analysis it is shown that composting has a higher potential for contribution to sustainable development than most other best in class projects. As these contributions can only be assured if certain requirements are followed, eight key obligations are presented.« less

  4. Early warning and crop condition assessment research

    NASA Technical Reports Server (NTRS)

    Boatwright, G. O.; Whitehead, V. S.

    1986-01-01

    The Early Warning Crop Condition Assessment Project of AgRISTARS was a multiagency and multidisciplinary effort. Its mission and objectives were centered around development and testing of remote-sensing techniques that enhance operational methodologies for global crop-condition assessments. The project developed crop stress indicators models that provide data filter and alert capabilities for monitoring global agricultural conditions. The project developed a technique for using NOAA-n satellite advanced very-high-resolution radiometer (AVHRR) data for operational crop-condition assessments. This technology was transferred to the Foreign Agricultural Service of the USDA. The project developed a U.S. Great Plains data base that contains various meteorological parameters and vegetative index numbers (VIN) derived from AVHRR satellite data. It developed cloud screening techniques and scan angle correction models for AVHRR data. It also developed technology for using remotely acquired thermal data for crop water stress indicator modeling. The project provided basic technology including spectral characteristics of soils, water, stressed and nonstressed crop and range vegetation, solar zenith angle, and atmospheric and canopy structure effects.

  5. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    NASA Astrophysics Data System (ADS)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and using geographic information systems - (GIS). 4. Using the output of the first three tasks, compilation of the DRC prototype, its validation, and testing the DRC feasibility for analyses of the recent regional environmental changes over Northern Eurasia and North America. Results of the first stage of the Project implementation are presented. This work is supported by the Ministry of Education and Science of the Russian Federation, Agreement № 14.613.21.0037.

  6. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  7. Problems of humanization in cosmonautics

    NASA Astrophysics Data System (ADS)

    Bul'Diaev, G. A.

    1992-03-01

    The paper discusses the ways of improving humanization of space-related science and technology projects, using the development of the space-rocket industry as an example. Consideration is given to ways of optimizing the military space-rocket programs with respect to minimizing environmental pollution and losses to arable and pasture land and maximizing benefits from rockets for scientific and agricultural programs. It is noted that the present economical crisis makes the continuation of the space project Buran not rational and that money saved would be better spent on the further development of the Energiia-series carriers. Attention is also given to work done on redirecting the research and technology for military projects toward civilian-type projects, on commercialization of these projects, and on further development of cooperation with foreign space programs and initiation of new cooperative projects.

  8. Project Plan for Recreation Resources Development. North Hartland Lake, Hartland and Hartford, Vermont.

    DTIC Science & Technology

    1981-01-01

    of reservoir management are included within the scope of thle project plan. The plan represents a culmination of knowledge gathered from past...a detailed inventory and analysis of the projects natural resources in order to minimize environment and aesthetic impact, promote logical development...and minimize development costs. Factors inventoried included soil types, vegetation, topography, wildlife, surface geology, historical

  9. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    NASA Technical Reports Server (NTRS)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  10. Mentoring for Business Engagement as Continuing Professional Development of University Academic Staff

    ERIC Educational Resources Information Center

    Helyer, Ruth; Lee, Dionne

    2012-01-01

    This paper reports an innovative continuing professional development (CPD) project for academic staff in a UK university. The aim of the project is to develop academics' skills in relating to the business environment. The project has a number of strands, but the principal focus of this paper is upon a mentoring initiative. Much CPD in universities…

  11. Adventure-Based Programming and Social Skill Development in the Lives of Diverse Youth: Perspectives from Two Research Projects

    ERIC Educational Resources Information Center

    Shirilla, Paul

    2009-01-01

    Social skill development is emerging as an important issue for educators and practitioners in their work with adolescent youth. This presentation will use the results from two ongoing research projects to examine the relationship between adventure-based programming and social skill development in the lives of diverse youth. The first project is…

  12. Early Identification of SE-Related Program Risks

    DTIC Science & Technology

    2009-09-30

    development of feasibility evidence for a 100-KSLOC project . It is good to note that the “sweet spots” are... models , or experiments with planned technologies and increasingly detailed analysis of development approaches and project productivity rates. The ...incomplete without the FED, it becomes a first-class project deliverable. This implies that it needs a plan for its development , and that each task

  13. Bilingual Resource Instruction for Development of Gainful Employment Skills. Project BRIDGES, 1987-88.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Adelman, Miriam

    The Bilingual Resources for Development of Gainful Employment skills (Project BRIDGES) was a federally-funded program in its second year of a 3-year funding cycle. Project BRIDGES aimed at developing the academic and vocational skills of limited-English-proficient (LEP) students who had failed two or more classes and were at risk of dropping out.…

  14. About ICLUS

    EPA Pesticide Factsheets

    ICLUS is a project for developing scenarios broadly consistent with global-scale, peer-reviewed storylines of population growth and economic development, which are used by climate change modelers to develop projections of future climate.

  15. Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway.

    PubMed

    Volden, Gro Holst

    2018-08-01

    Infrastructure projects in developed countries are rarely evaluated ex-post. Despite their number and scope, our knowledge about their various impacts is surprisingly limited. The paper argues that such projects must be assessed in a broad perspective that includes both operational, tactical and strategic aspects, and unintended as well as intended effects. A generic six-criteria evaluation framework is suggested, inspired by a framework frequently used to evaluate development assistance projects. It is tested on 20 Norwegian projects from various sectors (transport, defence, ICT, buildings). The results indicate that the majority of projects were successful, especially in operational terms, possibly because they underwent external quality assurance up-front. It is argued that applying this type of standardized framework provides a good basis for comparison and learning across sectors. It is suggested that evaluations should be conducted with the aim of promoting accountability, building knowledge about infrastructure projects, and continuously improve the tools, methods and governance arrangements used in the front-end of project development. Copyright © 2018 The Author. Published by Elsevier Ltd.. All rights reserved.

  16. Reengineering the project design process

    NASA Astrophysics Data System (ADS)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  17. Use of Multi-Disciplinary Projects To Develop Competence.

    ERIC Educational Resources Information Center

    Trotman-Dickenson, Danusia

    1992-01-01

    Undergraduate technology and business students at the Polytechnic of Wales (United Kingdom) participated in multi-disciplinary team projects to experience real life business challenges and develop competences that employers expect in professionals. Lists characteristics of successful multi-disciplinary projects, discusses cost and industry…

  18. 7 CFR 3570.93 - Regional Commission grants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to all ARC grants administered by Rural Development. Therefore, a separate Project Management... Commissions are handled in accordance with a separate Project Management Agreement between the respective... and Economic Development Act of 1965) for projects eligible for RHS assistance. RHS has agreed to...

  19. 7 CFR 3570.93 - Regional Commission grants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... to all ARC grants administered by Rural Development. Therefore, a separate Project Management... Commissions are handled in accordance with a separate Project Management Agreement between the respective... and Economic Development Act of 1965) for projects eligible for RHS assistance. RHS has agreed to...

  20. 7 CFR 3570.93 - Regional Commission grants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to all ARC grants administered by Rural Development. Therefore, a separate Project Management... Commissions are handled in accordance with a separate Project Management Agreement between the respective... and Economic Development Act of 1965) for projects eligible for RHS assistance. RHS has agreed to...

  1. 7 CFR 3570.93 - Regional Commission grants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to all ARC grants administered by Rural Development. Therefore, a separate Project Management... Commissions are handled in accordance with a separate Project Management Agreement between the respective... and Economic Development Act of 1965) for projects eligible for RHS assistance. RHS has agreed to...

  2. Project CLIMB.

    ERIC Educational Resources Information Center

    DeLucca, Adolph

    1982-01-01

    As a state and national model for a basic skills curriculum for Kindergarten through grade 12 students, Coordination Learning Integration--Middlesex Basics (Project CLIMB) is described. The unified system was developed by teachers with administrative support to accomodate all students' reading and mathematics needs. Project CLIMB's development and…

  3. Entrepreneurship Competencies.

    ERIC Educational Resources Information Center

    Cataldo, Paul F.

    Enterprise Skills Development Project for Youth (ESDPY), renamed Project EDGE (Encouraging the Development and Growth of Entrepreneurship), is described in this report. Project EDGE is a training program that assists youth in acquiring the entrepreneurial and life skills necessary to become successful employees/employers in the information age.…

  4. ASK Magazine. Volume 10

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward (Editor); Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    The Academy of Program and Project Leadership (APPL) and ASK Magazine is presented. APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of our Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects-they're all here in ASK. APPL is one of our most exciting publications about project management.

  5. Evaluating a collaborative IT based research and development project.

    PubMed

    Khan, Zaheer; Ludlow, David; Caceres, Santiago

    2013-10-01

    In common with all projects, evaluating an Information Technology (IT) based research and development project is necessary in order to discover whether or not the outcomes of the project are successful. However, evaluating large-scale collaborative projects is especially difficult as: (i) stakeholders from different countries are involved who, almost inevitably, have diverse technological and/or application domain backgrounds and objectives; (ii) multiple and sometimes conflicting application specific and user-defined requirements exist; and (iii) multiple and often conflicting technological research and development objectives are apparent. In this paper, we share our experiences based on the large-scale integrated research project - The HUMBOLDT project - with project duration of 54 months, involving contributions from 27 partner organisations, plus 4 sub-contractors from 14 different European countries. In the HUMBOLDT project, a specific evaluation methodology was defined and utilised for the user evaluation of the project outcomes. The user evaluation performed on the HUMBOLDT Framework and its associated nine application scenarios from various application domains, resulted in not only an evaluation of the integrated project, but also revealed the benefits and disadvantages of the evaluation methodology. This paper presents the evaluation methodology, discusses in detail the process of applying it to the HUMBOLDT project and provides an in-depth analysis of the results, which can be usefully applied to other collaborative research projects in a variety of domains. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  7. Governance in Open Source Software Development Projects: Towards a Model for Network-Centric Edge Organizations

    DTIC Science & Technology

    2008-06-01

    project is not an isolated OSSD project. Instead, the NetBeans IDE which is the focus of development activities in the NetBeans.org project community...facilitate or constrain the intended usage of the NetBeans IDE. Figure 1 provides a rendering of some of the more visible OSSD projects that...as BioBeans and RefactorIT communities build tools on top of or extending the NetBeans platform or IDE. How do these organizations interact with

  8. Learning from project experiences using a legacy-based approach

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  9. Program Evaluation - Automotive Lightweighting Materials Program Research and Development Projects Assessment of Benefits - Case Studies No. 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Das, S.

    This report is the second of a series of studies to evaluate research and development (R&D) projects funded by the Automotive Lightweighting Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). The objectives of the program evaluation are to assess short-run outputs and long-run outcomes that may be attributable to the ALM R&D projects. The ALM program focuses on the development and validation of advanced technologies that significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. Funded projects range from fundamentalmore » materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R&D projects were chosen for this evaluation: Design and Product Optimization for Cast Light Metals, Durability of Lightweight Composite Structures, and Rapid Tooling for Functional Prototyping of Metal Mold Processes. These projects were chosen because they have already been completed. The first project resulted in development of a comprehensive cast light metal property database, an automotive application design guide, computerized predictive models, process monitoring sensors, and quality assurance methods. The second project, the durability of lightweight composite structures, produced durability-based design criteria documents, predictive models for creep deformation, and minimum test requirements and suggested test methods for establishing durability properties and characteristics of random glass-fiber composites for automotive structural composites. The durability project supported Focal Project II, a validation activity that demonstrates ALM program goals and reduces the lead time for bringing new technology into the marketplace. Focal projects concentrate on specific classes of materials and nonproprietary components and are done jointly by DOE and the Automotive Composites Consortium of U.S. Council for Automotive Research (USCAR). The third project developed a rapid tooling process that reduces tooling time, originally some 48-52 weeks, to less than 12 weeks by means of rapid generation of die-casting die inserts and development of generic holding blocks, suitable for use with large casting applications. This project was conducted by the United States Automotive Materials Partnership, another USCAR consortium.« less

  10. NASA's TReK Project: A Case Study in Using the Spiral Model of Software Development

    NASA Technical Reports Server (NTRS)

    Hendrix, T. Dean; Schneider, Michelle P.

    1998-01-01

    Software development projects face numerous challenges that threaten their successful completion. Whether it is not enough money, too little time, or a case of "requirements creep" that has turned into a full sprint, projects must meet these challenges or face possible disastrous consequences. A robust, yet flexible process model can provide a mechanism through which software development teams can meet these challenges head on and win. This article describes how the spiral model has been successfully tailored to a specific project and relates some notable results to date.

  11. Lattice QCD Application Development within the US DOE Exascale Computing Project

    NASA Astrophysics Data System (ADS)

    Brower, Richard; Christ, Norman; DeTar, Carleton; Edwards, Robert; Mackenzie, Paul

    2018-03-01

    In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020's. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  12. Achievements and challenges of the World Bank Loan/Department for International Development grant-assisted Tuberculosis Control Project in China.

    PubMed

    Kong, Peng; Jiang, Xu; Zhang, Ben; Jiang, Shi-wen; Liu, Bo

    2011-07-01

    In March 2002, the government of China launched the World Bank Loan/ Department for International Development-supported Tuberculosis (TB) Control Project to reduce the prevalence and mortality of TB. The project generated promising results in policy development, strengthening of TB control systems, patient treatment success, funds management, and the introduction of legislation. In light of the global TB epidemic and control environment, it is useful to review the TB control priorities of the project, summarize the achievements and experiences around its implementation.

  13. Technology Investments in the NASA Entry Systems Modeling Project

    NASA Technical Reports Server (NTRS)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  14. Lattice QCD Application Development within the US DOE Exascale Computing Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brower, Richard; Christ, Norman; DeTar, Carleton

    In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020's. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  15. Complexity analysis of the cost effectiveness of PI-led NASA science missions

    NASA Astrophysics Data System (ADS)

    Yoshida, J.; Cowdin, M.; Mize, T.; Kellogg, R.; Bearden, D.

    For the last 20 years, NASA has allowed Principal Investigators (PIs) to manage the development of many unmanned space projects. Advocates of PI-led projects believe that a PI-led implementation can result in a project being developed at lower cost and shorter schedule than other implementation modes. This paper seeks to test this hypothesis by comparing the actual costs of NASA and other comparable projects developed under different implementation modes. The Aerospace Corporation's Complexity-Based Risk Assessment (CoBRA) analysis tool is used to normalize the projects such that the cost can be compared for equivalent project complexities. The data is examined both by complexity and by launch year. Cost growth will also be examined for any correlation with implementation mode. Defined in many NASA Announcements of Opportunity (AOs), a PI-led project is characterized by a central, single person with full responsibility for assembling a team and for the project's scientific integrity and the implementation and integrity of all other aspects of the mission, while operating under a cost cap. PIs have larger degrees of freedom to achieve the stated goals within NASA guidelines and oversight. This study leverages the definitions and results of previous National Research Council studies of PI-led projects. Aerospace has defined a complexity index, derived from mission performance, mass, power, and technology choices, to arrive at a broad representation of missions for purposes of comparison. Over a decade of research has established a correlation between mission complexity and spacecraft development cost and schedule. This complexity analysis, CoBRA, is applied to compare a PI-led set of New Frontiers, Discovery, Explorers, and Earth System Science Pathfinder missions to the overall NASA mission dataset. This reveals the complexity trends against development costs, cost growth, and development era.

  16. Development of Life Support System Technologies for Human Lunar Missions

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Ewert, Michael K.

    2009-01-01

    With the Preliminary Design Review (PDR) for the Orion Crew Exploration Vehicle planned to be completed in 2009, Exploration Life Support (ELS), a technology development project under the National Aeronautics and Space Administration s (NASA) Exploration Technology Development Program, is focusing its efforts on needs for human lunar missions. The ELS Project s goal is to develop and mature a suite of Environmental Control and Life Support System (ECLSS) technologies for potential use on human spacecraft under development in support of U.S. Space Exploration Policy. ELS technology development is directed at three major vehicle projects within NASA s Constellation Program (CxP): the Orion Crew Exploration Vehicle (CEV), the Altair Lunar Lander and Lunar Surface Systems, including habitats and pressurized rovers. The ELS Project includes four technical elements: Atmosphere Revitalization Systems, Water Recovery Systems, Waste Management Systems and Habitation Engineering, and two cross cutting elements, Systems Integration, Modeling and Analysis, and Validation and Testing. This paper will provide an overview of the ELS Project, connectivity with its customers and an update to content within its technology development portfolio with focus on human lunar missions.

  17. Study on the measures to promote the use of photovoltaic power generating system overseas

    NASA Astrophysics Data System (ADS)

    1989-03-01

    In order to understand the state of the utilizing photovoltaic power generating system, the present situation to promote its development, the actual status of the assistance for developing countries by each country or by each international organization, research was done for USA, principal western countries, UN and EC. First, development conditions of the solar cell utilizing technique were classified by each country at the standpoint of developing and promoting systems. Second, the projects and policies in each country or international organization were arranged to promote research, development and introduction. Next, the present situation of the photovoltaic power generation projects by civilian parties and the problems to assist the projects by each country were arranged. While, the present sutuation of the photovoltaic power generation projects assisted by the governments and international organizations were classified by each country and each international organizations. Finally, in view of importance in the photovoltaic power generation project, it was concluded that not only developed country governments and international organizations but also private enterprises in developed countries were required to expand the understanding about the photovoltaic power generation system.

  18. Development of Team Action Projects in Surgery (TAPS): a multilevel team-based approach to teaching quality improvement.

    PubMed

    Waits, Seth A; Reames, Bradley N; Krell, Robert W; Bryner, Benjamin; Shih, Terry; Obi, Andrea T; Henke, Peter K; Minter, Rebecca M; Englesbe, Michael J; Wong, Sandra L

    2014-01-01

    To meet the Accreditation Council for Graduate Medical Education core competency in Practice-Based Learning and Improvement, educational curricula need to address training in quality improvement (QI). We sought to establish a program to train residents in the principles of QI and to provide practical experiences in developing and implementing improvement projects. We present a novel approach for engaging students, residents, and faculty in QI efforts-Team Action Projects in Surgery (TAPS). Large academic medical center and health system. Multiple teams consisting of undergraduate students, medical students, surgery residents, and surgery faculty were assembled and QI projects developed. Using "managing to learn" Lean principles, these multilevel groups approached each project with robust data collection, development of an A3, and implementation of QI activities. A total of 5 resident led QI projects were developed during the TAPS pilot phase. These included a living kidney donor enhanced recovery protocol, consult improvement process, venous thromboembolism prophylaxis optimization, Clostridium difficile treatment standardization, and understanding variation in operative duration of laparoscopic cholecystectomy. Qualitative and quantitative assessment showed significant value for both the learner and stakeholders of QI related projects. Through the development of TAPS, we demonstrate a novel approach to addressing the increasing focus on QI within graduate medical education. Efforts to expand this multilevel team based approach would have value for teachers and learners alike. Copyright © 2014. Published by Elsevier Inc.

  19. Let your fingers do the walking: The projects most invaluable tool

    NASA Technical Reports Server (NTRS)

    Zirk, Deborah A.

    1993-01-01

    The barrage of information pertaining to the software being developed for a project can be overwhelming. Current status information, as well as the statistics and history of software releases, should be 'at the fingertips' of project management and key technical personnel. This paper discusses the development, configuration, capabilities, and operation of a relational database, the System Engineering Database (SEDB) which was designed to assist management in monitoring of the tasks performed by the Network Control Center (NCC) Project. This database has proven to be an invaluable project tool and is utilized daily to support all project personnel.

  20. Effective Monitoring and Control of Outsourced Software Development Projects

    NASA Astrophysics Data System (ADS)

    Ponisio, Laura; Vruggink, Peter

    In our study of four outsourcing projects we discover mechanisms to support managerial decision making during software development processes. We report on Customer Office, a framework used in practice that facilitates reasoning about projects by highlighting information paths and making co-ordination issues explicit. The results suggest a key role of modularisation and standardisation to assist in value creation, by facilitating information flow and keeping the overview of the project. The practical implications of our findings are guidelines for managing outsourcing projects such as to have a modularised view of the project based on knowledge domains and to standardise co-ordination operations.

  1. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  2. Combining Project Management Methods: A Case Study of Dlstributed Work Practices

    NASA Astrophysics Data System (ADS)

    Backlund, Per; Lundell, Björn

    The increasing complexity of information systems development (ISD) projects call for improved project management practices. This, together with an endeavour to improve the success rate of ISD projects (Lyytinen and Robey 1999; Cooke-Davies 2002; White and Fortune 2002), has served as drivers for various efforts in process improvement such as the introduction of new development methods (Fitzgerald 1997; Iivari and Maansaari 1998).

  3. Moderation and Assessment Project--South West. A Presentation of a Model for Moderating Pupils' Work That Is Teacher Assessed, Developed in England, UK.

    ERIC Educational Resources Information Center

    Radnor, Hilary

    The Moderation and Assessment Project, South West, was an outgrowth of the Technical and Vocational Educational Initiative of the government of the United Kingdom that attempted to develop more courses with vocational relevance for adolescents. Growing from research projects under the Moderation and Assessment project, a new model of moderation is…

  4. Outlook for outdoor recreation in the northern United States. A technical document supporting the Northern Forest Futures Project with projections through 2060

    Treesearch

    J.M. Bowker; Ashley E. Askew

    2013-01-01

    We develop projections of participation and use for 17 nature-based outdoor recreation activities through 2060 for the Northern United States. Similar to the 2010 Resources Planning Act (RPA) assessment, this report develops recreation projections under futures wherein population growth, socioeconomic conditions, land use changes, and climate are allowed to change over...

  5. Grouping Handicapped and Non-Handicapped Children in Mainstream Settings. The Functional Mainstreaming for Success (FMS) Project. Project Review Papers. Final Report--Part 3.

    ERIC Educational Resources Information Center

    Striefel, Sebastian; And Others

    The review papers are a product of the 3-year project, "Functional Mainstreaming for Success," designed to develop a model for instructional mainstreaming of 162 handicapped children (3-6 years old) in community settings. The major feature of the project was development of a full reverse mainstreamed preschool program, which included…

  6. Past Project Expo Sites

    EPA Pesticide Factsheets

    This page provides information for Project Expo sites that were featured at the LMOP Conferences in 2013 and 2014. Project Expo sites were featured as being interested in identifying project partners for the development of an LFG energy project.

  7. Coherent Lidar Activities at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Kavaya, Michael J.; Amzajerdian, Farzin; Koch, Grady J.; Singh, Upendra N.; Yu, Jirong

    2007-01-01

    NASA Langley Research Center has been developing and using coherent lidar systems for many years. The current projects at LaRC are the Global Wind Observing Sounder (GWOS) mission preparation, the Laser Risk Reduction Program (LRRP), the Instrument Incubator Program (IIP) compact, rugged Doppler wind lidar project, the Autonomous precision Landing and Hazard detection and Avoidance Technology (ALHAT) project for lunar landing, and the Skywalker project to find and use thermals to extend UAV flight time. These five projects encompass coherent lidar technology development; characterization, validation, and calibration facilities; compact, rugged packaging; computer simulation; trade studies; data acquisition, processing, and display development; system demonstration; and space mission design. This paper will further discuss these activities at LaRC.

  8. Status of development of LCOS projection displays for F-22A, F/A-18E/F, and JSF cockpits

    NASA Astrophysics Data System (ADS)

    Kalmanash, Michael H.

    2001-09-01

    Projection display technology has been found to be an attractive alternative to direct view flat panel displays in many avionics applications. The projection approach permits compact high performance systems to be tailored to specific platform needs while using a complement of commercial off the shelf (COTS) components, including liquid crystal on silicon (LCOS) microdisplay imagers. A common projection engine used on multiple platforms enables improved performance, lower cost and shorter development cycles. This paper provides a status update for projection displays under development for the F-22A, the F/A-18E/F and the Lockheed Joint Strike Fighter (JSF) aircraft.

  9. Bioinformatics projects supporting life-sciences learning in high schools.

    PubMed

    Marques, Isabel; Almeida, Paulo; Alves, Renato; Dias, Maria João; Godinho, Ana; Pereira-Leal, José B

    2014-01-01

    The interdisciplinary nature of bioinformatics makes it an ideal framework to develop activities enabling enquiry-based learning. We describe here the development and implementation of a pilot project to use bioinformatics-based research activities in high schools, called "Bioinformatics@school." It includes web-based research projects that students can pursue alone or under teacher supervision and a teacher training program. The project is organized so as to enable discussion of key results between students and teachers. After successful trials in two high schools, as measured by questionnaires, interviews, and assessment of knowledge acquisition, the project is expanding by the action of the teachers involved, who are helping us develop more content and are recruiting more teachers and schools.

  10. Ceramic Technology for Advanced Heat Engines Project. Semiannual progress report, October 1984-March 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-09-01

    A five-year project plan was developed with extensive input from private industry. The objective of the project is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applicationsmore » in these engines.« less

  11. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    NASA Technical Reports Server (NTRS)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  12. Call for Applications – Clinical Assay Development Program | Office of Cancer Clinical Proteomics Research

    Cancer.gov

    The NCI Clinical Assay Development Program (CADP) is requesting project applications from investigators seeking clinical assay validation resources.  These resources are designed to assist with the development of assays that may predict therapy response or prognostic behavior of a diagnosed cancer, primarily for use in clinical trials. Approved projects for the NCI CADP will be provided access to the Institute’s assay development and validation resources, including project management support.

  13. Science Fair Projects: The Environment.

    ERIC Educational Resources Information Center

    Bonnet, Bob; Keen, Dan

    This book approaches the development of science fair projects from the point of view that science should be enjoyable, interesting, and thought-provoking. The scientific concepts introduced here will later help young students to understand more advanced scientific principles. These projects develop skills such as classification, making measured…

  14. Texas Urban Triangle : pilot study to implement a spatial decision support system (SDSS) for sustainable mobility.

    DOT National Transportation Integrated Search

    2011-03-01

    This project addressed sustainable transportation in the Texas Urban Triangle (TUT) by conducting a pilot : project at the county scale. The project tested and developed the multi-attribute Spatial Decision Support : System (SDSS) developed in 2009 u...

  15. 78 FR 7427 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... Waters Canoe Area Wilderness (BWCAW) Non-native Plant Management Project, Cook, Lake and St. Louis... Development Project, Approval of Gaming Development and Management, Spokane County, WA, Review Period Ends: 03... EIS, AFS, OR, Rim Paunina Project and Forest Plan Amendments, Crescent Ranger District, Deschutes...

  16. 24 CFR 290.15 - Disposition plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...

  17. 24 CFR 290.15 - Disposition plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...

  18. 24 CFR 290.15 - Disposition plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...

  19. Native Youth Businesses: Native American Youth Entrepreneurship Projects.

    ERIC Educational Resources Information Center

    Children Today, 1994

    1994-01-01

    Describes five demonstration projects intended to stimulate innovative community approaches to developing entrepreneurial activities for Native American youth. Each of the projects is charged with meeting the community's need to train young persons with relevant entrepreneurial orientations and management skills to improve economic development.…

  20. Project: MOBILITY. Introduction and Summary.

    ERIC Educational Resources Information Center

    Fresno City Coll., CA.

    This report summarizes a project designed to develop vocational educational programs and services for educationally disadvantaged and physically handicapped students at Fresno City College, California. The introduction provides an overview of the two phases of the project: phase I, a needs assessment; and phase II, curriculum development and…

  1. Federal Aviation Administration Small Business Innovation Research 5- Year Project Summaries

    DTIC Science & Technology

    1990-02-01

    Completed Project: The project’s two primary objectives were to further develop the technology base for the Slaved Tandem Freewing (STF) Airplance and...margins than conventional airplances , and can meet all applicable airworthiness requirements. Adaitionally, basic design parameters were developed

  2. 13 CFR 305.5 - Project administration by District Organization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project administration by District Organization. 305.5 Section 305.5 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects...

  3. 13 CFR 305.9 - Project phasing and Investment disbursement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project phasing and Investment disbursement. 305.9 Section 305.9 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects...

  4. 7 CFR 955.50 - Research and development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... development and marketing promotion projects, including paid advertising, designed to assist, improve, or... project for the promotion and advertising of Vidalia onions may utilize an identifying mark which shall be... projects; and (3) Its recommendations as to promotion activity and paid advertising. (d) Upon conclusion of...

  5. Introduction to SIMRAND: Simulation of research and development project

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1982-01-01

    SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.

  6. Developing a Long-term Monitoring Program with Undergraduate Students in Marine Sciences

    NASA Astrophysics Data System (ADS)

    Anders, T. M.; Boryta, M. D.

    2015-12-01

    A goal of our growing marine geoscience program at Mt. San Antonio College is to involve our students in all stages of developing and running an undergraduate research project. During the initial planning phase, students develop and test their proposals. Instructor-set parameters were chosen carefully to help guide students toward manageable projects but to not limit their creativity. Projects should focus on long-term monitoring of a coastal area in southern California. During the second phase, incoming students will critique the initial proposals, modify as necessary and continue to develop the project. We intend for data collection opportunities to grow from geological and oceanographic bases to eventually include other STEM topics in biology, chemistry, math and GIS. Questions we will address include: What makes this a good research project for a community college? What are the costs and time commitments involved? How will the project benefit students and society? Additionally we will share our initial results, challenges, and unexpected pitfalls and benefits.

  7. Internal Stakeholder Engagement for Renewable Projects

    EPA Pesticide Factsheets

    The Toolbox for Renewable Energy Project Development's Internal Stakeholder Engagement for Renewable Projects page discusses the importance of garnering stakeholder buy-in for renewable energy project success.

  8. The QWeCI Project: seamlessly linking climate science to society

    NASA Astrophysics Data System (ADS)

    Morse, A. P.; Caminade, C.; Jones, A. E.; MacLeod, D.; Heath, A. E.

    2012-04-01

    The EU FP7 QWeCI project Quantifying Weather and Climate Impacts on health in developing countries (www.liv.ac.uk/qweci) has 13 partners with 7 of these in Africa. The geographical focus of the project is in Senegal, Ghana and Malawi. In all three countries the project has a strong scientific dissemination outlook as well as having field based surveillance programmes in Ghana and Senegal to understand more about the local parameters controlling the transmission of malaria and in Senegal of Rift Valley fever. The project has a strong and active climate science activity in using hindcasts of the new System 4 seasonal forecasting system at ECMWF; to further develop the use of monthly to seasonal forecasts from ensemble prediction systems; within project downscaling development; the assessment of decadal ensemble prediction systems; and the development and testing of vector borne disease models for malaria and Rift Valley fever. In parallel with the science programme the project has a large outreach activity involving regular communication and bi-lateral exchanges, science and decision maker focused workshops. In Malawi a long range WiFi network has been established for the dissemination of data. In Senegal where they is a concentration of partners and stakeholders the project is gaining a role as a catalyst for wider health and climate related activity within government departments and national research bodies along with the support and involvement of local communities. Within these wider community discussions we have interactive inputs from African and European scientists who are partners in the project. This paper will show highlights of the work completed so far and give an outline to future development and to encourage a wider user interaction from outside of the current project team and their direct collaborators.

  9. Economic, Socio-Political and Environmental Risks of Road Development in the Tropics.

    PubMed

    Alamgir, Mohammed; Campbell, Mason J; Sloan, Sean; Goosem, Miriam; Clements, Gopalasamy Reuben; Mahmoud, Mahmoud I; Laurance, William F

    2017-10-23

    It is projected that 25 million km of new paved roads will be developed globally by 2050 - enough to encircle the planet more than 600 times. Roughly 90% of new roads will be built in developing nations, frequently in tropical and subtropical regions with high biodiversity and environmental values. Many developing nations are borrowing from international lenders or negotiating access to their natural resources in order to expand their transportation infrastructure. Given the unprecedented pace and extent of these initiatives, it is vital to thoroughly assess the potential consequences of large-scale road and highway projects. In appropriate contexts and locales, new roads can promote sizeable economic and social benefits. If poorly planned or implemented, however, new roads can provoke serious cost overruns, corruption and environmental impacts, while generating sparse economic benefits and intense social and political conflict. Using examples from developing nations, we identify risks that can hinder road projects in wet and dry tropical environments. Such risks, we assert, are often inadequately considered by project proponents, evaluators and the general public, creating a systematic tendency to overestimate project benefits while understating project risks. A more precautionary approach is needed to reduce risks while maximizing benefits of new road projects in the tropics. Copyright © 2017 Elsevier Ltd. All rights reserved.

  10. Advanced Exploration Systems Atmosphere Resource Recovery and Environmental Monitoring

    NASA Technical Reports Server (NTRS)

    Perry, J.; Abney, M.; Conrad, R.; Garber, A.; Howard, D.; Kayatin, M.; Knox, J.; Newton, R.; Parrish, K.; Roman, M.; hide

    2016-01-01

    In September 2011, the Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project was commissioned by NASA's Advanced Exploration Systems program to advance Atmosphere Revitalization Subsystem (ARS) and Environmental Monitoring Subsystem (EMS) technologies for enabling future crewed space exploration missions beyond low Earth orbit. The ARREM project's period of performance covered U.S. Government fiscal years 2012-2014. The ARREM project critically assessed the International Space Station (ISS) ARS and EMS architectures and process technologies as the foundation for an architecture suitable for deep space exploration vehicles. The project's technical content included technical tasks focused on improving the reliability and life cycle cost of ARS and EMS technologies as well as reducing future flight project developmental risk and design, development, test, and evaluation costs. Targeted technology development and maturation tasks, including key technical trade assessments, were accomplished and integrated ARS architectures were demonstrated. The ARREM project developed, demonstrated, and tested leading process technology candidates and subsystem architectures that met or exceeded key figures of merit, addressed capability gaps, and significantly improved the efficiency, safety, and reliability over the state-of-the-art ISS figures of merit. Promising EMS instruments were developed and functionally demonstrated in a simulated cabin environment. The project's technical approach and results are described and recommendations for continued development are provided.

  11. Educator's Guide to Program Development in Natural Resources: Program Development Summary.

    ERIC Educational Resources Information Center

    Yoder, Jon; Maine, Neal

    2001-01-01

    Distinguishes between natural resource programs and natural resource projects and provides a project planning outline. Addresses critical elements and concerns in the development of natural resource programs. (DDR)

  12. 76 FR 46756 - Strategic Environmental Research and Development Program (SERDP), Scientific Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... research and development projects related to the Munitions Response and Resource Conservation and Climate Change program areas. These projects are requesting Strategic Environmental Research and Development...

  13. Physics Curriculum Development Project. Aims, Organisation, Activities of PLON: A Physics Curriculum Development Project for General Secondary Education in the Netherlands. Outline.

    ERIC Educational Resources Information Center

    Utrecht State Univ., (Netherlands).

    This document highlights the aims and activities of a project designed to modernize and update physics teaching and physics curriculum in the Netherlands by developing materials for use with students aged 12-18 at intermediate general, higher general, and pre-university schools. Following general information (including a brief description of the…

  14. A Completed Research and Development Work Project in School: The Teachers' Learning and Possibilities, Premises and Challenges for Further Development

    ERIC Educational Resources Information Center

    Postholm, May Britt

    2011-01-01

    The article is based on a follow-up study of a research and development work project with school leaders and teachers conducted in a Norwegian lower secondary school. The purpose is to present an understanding of "what the practitioners find they have learned" during the project and "how they experience the situation with regard to…

  15. Hydrogen Vent Ground Umbilical Quick Disconnect - Flight Seal Advanced Development

    NASA Technical Reports Server (NTRS)

    Girard, Doug; Jankowski, Fred; Minich, Mark C.; Yu, Weiping

    2012-01-01

    This project is a team effort between NASA Engineering (NE) and Team QNA Engineering personnel to provide support for the Umbilical Systems Development project which is funded by Advanced Exploration Systems (AES) and 21st Century Launch Complex. Specifically, this project seeks to develop a new interface between the PPBE baselined Legacy SSP LH2 Vent Arm QD probe and SLS vent seal.

  16. 30 CFR 203.64 - How many applications may I file on a field or a development project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How many applications may I file on a field or a development project? 203.64 Section 203.64 Mineral Resources MINERALS MANAGEMENT SERVICE... § 203.64 How many applications may I file on a field or a development project? You may file one complete...

  17. Yield model development project implementation plan

    NASA Technical Reports Server (NTRS)

    Ambroziak, R. A.

    1982-01-01

    Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.

  18. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Volunteer community service projects. 551...

  19. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  20. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  1. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  2. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  3. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  4. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  5. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  6. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  7. Research on the application of BIM technology in the whole life cycle of construction projects

    NASA Astrophysics Data System (ADS)

    Chang-liu, CHEN; Wei-wei, KOU; Shuai-hua, YE

    2018-05-01

    BIM technology can realize information sharing, and good BIM application will reduce the whole life cycle cost of construction projects. The popularization of BIM technology challenges the application of BIM technology at all stages of the whole life cycle of the construction project. It will give full play to the value of BIM, if developing a reasonable BIM project execution plan, defining BIM requirements, specifying Level of Development, determining the BIM quality control plan and clearing BIM application content of each stage, and will provide a unified method for project stakeholders, realize the whole life cycle of construction projects, and achieve the desired information sharing in construction project.

  8. Software risk management through independent verification and validation

    NASA Technical Reports Server (NTRS)

    Callahan, John R.; Zhou, Tong C.; Wood, Ralph

    1995-01-01

    Software project managers need tools to estimate and track project goals in a continuous fashion before, during, and after development of a system. In addition, they need an ability to compare the current project status with past project profiles to validate management intuition, identify problems, and then direct appropriate resources to the sources of problems. This paper describes a measurement-based approach to calculating the risk inherent in meeting project goals that leverages past project metrics and existing estimation and tracking models. We introduce the IV&V Goal/Questions/Metrics model, explain its use in the software development life cycle, and describe our attempts to validate the model through the reverse engineering of existing projects.

  9. 7 CFR 1210.311 - Programs and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.311 Programs and projects. Programs and projects mean those research, development, advertising, or promotion programs or projects...

  10. Development of high-rise buildings: digitalization of life cycle management

    NASA Astrophysics Data System (ADS)

    Gusakova, Elena

    2018-03-01

    The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  11. Potential of wind power projects under the Clean Development Mechanism in India

    PubMed Central

    Purohit, Pallav; Michaelowa, Axel

    2007-01-01

    Background So far, the cumulative installed capacity of wind power projects in India is far below their gross potential (≤ 15%) despite very high level of policy support, tax benefits, long term financing schemes etc., for more than 10 years etc. One of the major barriers is the high costs of investments in these systems. The Clean Development Mechanism (CDM) of the Kyoto Protocol provides industrialized countries with an incentive to invest in emission reduction projects in developing countries to achieve a reduction in CO2 emissions at lowest cost that also promotes sustainable development in the host country. Wind power projects could be of interest under the CDM because they directly displace greenhouse gas emissions while contributing to sustainable rural development, if developed correctly. Results Our estimates indicate that there is a vast theoretical potential of CO2 mitigation by the use of wind energy in India. The annual potential Certified Emissions Reductions (CERs) of wind power projects in India could theoretically reach 86 million. Under more realistic assumptions about diffusion of wind power projects based on past experiences with the government-run programmes, annual CER volumes by 2012 could reach 41 to 67 million and 78 to 83 million by 2020. Conclusion The projections based on the past diffusion trend indicate that in India, even with highly favorable assumptions, the dissemination of wind power projects is not likely to reach its maximum estimated potential in another 15 years. CDM could help to achieve the maximum utilization potential more rapidly as compared to the current diffusion trend if supportive policies are introduced. PMID:17663772

  12. Surface Habitat Systems

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2009-01-01

    The Surface Habitat Systems (SHS) Focused Investment Group (FIG) is part of the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) effort to provide a focused direction and funding to the various projects that are working on human surface habitat designs and technologies for the planetary exploration missions. The overall SHS-FIG effort focuses on directing and guiding those projects that: 1) develop and demonstrate new surface habitat system concepts, innovations, and technologies to support human exploration missions, 2) improve environmental systems that interact with human habitats, 3) handle and emplace human surface habitats, and 4) focus on supporting humans living and working in habitats on planetary surfaces. The activity areas of the SHS FIG described herein are focused on the surface habitat project near-term objectives as described in this document. The SHS-FIG effort focuses on mitigating surface habitat risks (as identified by the Lunar Surface Systems Project Office (LSSPO) Surface Habitat Element Team; and concentrates on developing surface habitat technologies as identified in the FY08 gap analysis. The surface habitat gap assessment will be updated annually as the surface architecture and surface habitat definition continues to mature. These technologies are mapped to the SHS-FIG Strategic Development Roadmap. The Roadmap will bring to light the areas where additional innovative efforts are needed to support the development of habitat concepts and designs and the development of new technologies to support of the LSSPO Habitation Element development plan. Three specific areas of development that address Lunar Architecture Team (LAT)-2 and Constellation Architecture Team (CxAT) Lunar habitat design issues or risks will be focused on by the SHS-FIG. The SHS-FIG will establish four areas of development that will help the projects prepare in their planning for surface habitat systems development. Those development areas are the 1) surface habitat concept definition, 2) inflatable surface habitat development, and 3) autonomous habitat operations, and 4) cross-cutting / systems engineering. In subsequent years, the SHS-FIG will solicit a call for innovations and technologies that will support the development of these four development areas. The other development areas will be assessed yearly and identified on the SHS-FIG s Strategic Development Roadmap. Initial investment projects that are funded by the Constellation Program Office (CxPO), LSSPO, or the Exploration Technology Development Projects (ETDP) will also be included on the Roadmap. For example, in one or two years from now, the autonomous habitat operations and testbed would collaborations with the Integrated Systems Health Management (ISHM) and Automation for Operations ETDP projects, which will give the surface habitat projects an integrated habitat autonomy testbed to test software and systems. The SHS-FIG scope is to provide focused direction for multiple innovations, technologies and subsystems that are needed to support humans at a remote planetary surface habitat during the concept development, design definition, and integration phases of that project. Subsystems include: habitability, lightweight structures, power management, communications, autonomy, deployment, outfitting, life support, wireless connectivity, lighting, thermal and more.

  13. Development Of Regional Climate Mitigation Baseline For A DominantAgro-Ecological Zone Of Karnataka, India

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sudha, P.; Shubhashree, D.; Khan, H.

    2007-06-01

    Setting a baseline for carbon stock changes in forest andland use sector mitigation projects is an essential step for assessingadditionality of the project. There are two approaches for settingbaselines namely, project-specific and regional baseline. This paperpresents the methodology adopted for estimating the land available formitigation, for developing a regional baseline, transaction cost involvedand a comparison of project-specific and regional baseline. The studyshowed that it is possible to estimate the potential land and itssuitability for afforestation and reforestation mitigation projects,using existing maps and data, in the dry zone of Karnataka, southernIndia. The study adopted a three-step approach for developing a regionalbaseline,more » namely: i) identification of likely baseline options for landuse, ii) estimation of baseline rates of land-use change, and iii)quantification of baseline carbon profile over time. The analysis showedthat carbon stock estimates made for wastelands and fallow lands forproject-specific as well as the regional baseline are comparable. Theratio of wasteland Carbon stocks of a project to regional baseline is1.02, and that of fallow lands in the project to regional baseline is0.97. The cost of conducting field studies for determination of regionalbaseline is about a quarter of the cost of developing a project-specificbaseline on a per hectare basis. The study has shown the reliability,feasibility and cost-effectiveness of adopting regional baseline forforestry sectormitigation projects.« less

  14. Guidelines for developing distributed virtual environment applications

    NASA Astrophysics Data System (ADS)

    Stytz, Martin R.; Banks, Sheila B.

    1998-08-01

    We have conducted a variety of projects that served to investigate the limits of virtual environments and distributed virtual environment (DVE) technology for the military and medical professions. The projects include an application that allows the user to interactively explore a high-fidelity, dynamic scale model of the Solar System and a high-fidelity, photorealistic, rapidly reconfigurable aircraft simulator. Additional projects are a project for observing, analyzing, and understanding the activity in a military distributed virtual environment, a project to develop a distributed threat simulator for training Air Force pilots, a virtual spaceplane to determine user interface requirements for a planned military spaceplane system, and an automated wingman for use in supplementing or replacing human-controlled systems in a DVE. The last two projects are a virtual environment user interface framework; and a project for training hospital emergency department personnel. In the process of designing and assembling the DVE applications in support of these projects, we have developed rules of thumb and insights into assembling DVE applications and the environment itself. In this paper, we open with a brief review of the applications that were the source for our insights and then present the lessons learned as a result of these projects. The lessons we have learned fall primarily into five areas. These areas are requirements development, software architecture, human-computer interaction, graphical database modeling, and construction of computer-generated forces.

  15. Methodology of quality improvement projects for the Texas Medicare population.

    PubMed

    Pendergrass, P W; Abel, R L; Bing, M; Vaughn, R; McCauley, C

    1998-07-01

    The Texas Medical Foundation, the quality improvement organization for the state of Texas, develops local quality improvement projects for the Medicare population. These projects are developed as part of the Health Care Quality Improvement Program undertaken by the Health Care Financing Administration. The goal of a local quality improvement project is to collaborate with providers to identify and reduce the incidence of unintentional variations in the delivery of care that negatively impact outcomes. Two factors are critical to the success of a quality improvement project. First, as opposed to peer review that is based on implicit criteria, quality improvement must be based on explicit criteria. These criteria represent key steps in the delivery of care that have been shown to improve outcomes for a specific disease. Second, quality improvement must be performed in partnership with the health care community. As such, the health care community must play an integral role in the design and evaluation of a quality improvement project and in the design and implementation of the resulting quality improvement plan. Specifically, this article provides a historical perspective for the transition from peer review to quality improvement. It discusses key steps used in developing and implementing local quality improvement projects including topic selection, quality indicator development, collaborator recruitment, and measurement of performance/improvement. Two Texas Medical Foundation projects are described to highlight the current methodology and to illustrate the impact of quality improvement projects.

  16. Advanced Monobore Concept, Development of CFEX Self-Expanding Tubular Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeff Spray

    2007-09-30

    The Advanced Monobore Concept--CFEX{copyright} Self-Expanding Tubular Technology Development was a successfully executed fundamental research through field demonstration project. This final report is presented as a progression, according to basic technology development steps. For this project, the research and development steps used were: concept development, engineering analysis, manufacturing, testing, demonstration, and technology transfer. The CFEX{copyright} Technology Development--Advanced Monobore Concept Project successfully completed all of the steps for technology development, covering fundamental research, conceptual development, engineering design, advanced-level prototype construction, mechanical testing, and downhole demonstration. Within an approximately two year period, a partially defined, broad concept was evolved into a substantial newmore » technological area for drilling and production engineering applicable a variety of extractive industries--which was also successfully demonstrated in a test well. The demonstration achievement included an actual mono-diameter placement of two self-expanding tubulars. The fundamental result is that an economical and technically proficient means of casing any size of drilling or production well or borehole is indicated as feasible based on the results of the project. Highlighted major accomplishments during the project's Concept, Engineering, Manufacturing, Demonstration, and Technology Transfer phases, are given.« less

  17. Bridging worlds/charting new courses

    NASA Astrophysics Data System (ADS)

    This report describes the work being done within Sandia's renewable energy program. This work touches on four major disciplines. (1) Photovoltaics. The goal of this project is to develop costeffective, reliable energy system technologies for energy supplies worldwide produced by U.S. industry. It encompasses cell research and development, collector development, technology evaluation, systems engineering, domestic and international applications, and design assistance. (2) Solar Thermal. This project endeavors to develop and increase acceptance of solar thermal electric and industrial technologies as cost-competitive candidates for power generation and to promote their commercialization. Its' major activities are with dish/Stirling systems, the Solar Two power tower, design assistance to industry and users, technology development and research activities. (3) Wind. The wind project impacts domestic and international markets with commercially feasible systems for utility-scale and other applications of wind energy. The project conducts applied research in aerodynamics, structural dynamics, fatigue, materials and controls, and engineering systems, and develops cooperative work with industry. (4) Geothermal. This project is developing technology to increase proven geothermal reserves and is assisting industry in expanding geothermal power on-line. Development work is in stemhole drilling, drilling techniques, instrumentation for geothermal wells, acoustic telemetry, and drilling exploratory wells.

  18. The development and technology transfer of software engineering technology at NASA. Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Pitman, C. L.; Erb, D. M.; Izygon, M. E.; Fridge, E. M., III; Roush, G. B.; Braley, D. M.; Savely, R. T.

    1992-01-01

    The United State's big space projects of the next decades, such as Space Station and the Human Exploration Initiative, will need the development of many millions of lines of mission critical software. NASA-Johnson (JSC) is identifying and developing some of the Computer Aided Software Engineering (CASE) technology that NASA will need to build these future software systems. The goal is to improve the quality and the productivity of large software development projects. New trends are outlined in CASE technology and how the Software Technology Branch (STB) at JSC is endeavoring to provide some of these CASE solutions for NASA is described. Key software technology components include knowledge-based systems, software reusability, user interface technology, reengineering environments, management systems for the software development process, software cost models, repository technology, and open, integrated CASE environment frameworks. The paper presents the status and long-term expectations for CASE products. The STB's Reengineering Application Project (REAP), Advanced Software Development Workstation (ASDW) project, and software development cost model (COSTMODL) project are then discussed. Some of the general difficulties of technology transfer are introduced, and a process developed by STB for CASE technology insertion is described.

  19. 24 CFR 570.209 - Guidelines for evaluating and selecting economic development projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... selecting economic development projects. 570.209 Section 570.209 Housing and Urban Development Regulations... DEVELOPMENT BLOCK GRANTS Eligible Activities § 570.209 Guidelines for evaluating and selecting economic... activities to be carried out for economic development purposes. Specifically, these guidelines are applicable...

  20. 24 CFR 570.209 - Guidelines for evaluating and selecting economic development projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... selecting economic development projects. 570.209 Section 570.209 Housing and Urban Development Regulations... DEVELOPMENT BLOCK GRANTS Eligible Activities § 570.209 Guidelines for evaluating and selecting economic... activities to be carried out for economic development purposes. Specifically, these guidelines are applicable...

  1. Initial Results of the Master's Degree Programme in "Leadership in Medicine" – Impact on hospital-based follow-on training of doctors

    PubMed Central

    Wulfert, Chris-Henrik; Hoitz, Joachim; Senger, Ulrike

    2017-01-01

    Objective: This pilot project, which was jointly conducted by a hospital and a university, describes the development of the Master's Degree Programme in Leadership in Medicine, a course designed to supplement medical specialty training. The aim of the pilot project is to demonstrate how hospital-based projects on personnel and organisational development undertaken under academic supervision can be used to increase leadership responsibility among doctors whose duties include providing initial and follow-on training and to professionalise medical specialty training as a leadership task. This need arose from the nationwide requirements and an internal audit regarding follow-on training. The version of the degree programme described below aims to further the personnel development of the participants in the field of didactics. Method: Each of the nine modules is made up of two classroom-based phases and one distance learning phase. The distance learning phase involves undertaking hospital-based projects on personnel and organisational development under academic supervision. The pilot phase participants were hospital doctors who, as part of their duties, hold leadership responsibility or are involved in the follow-on training of doctors. Results: The 17 participants successfully implemented more than 30 hospital-based projects during the distance learning phases of the nine modules. These projects included the development of medical specialty curricula, relevant didactic methods and evaluation design and were subsequently presented and subjected to reflection in interdisciplinary groups. The project presentation together with the project report were regarded as proof of competency. Conclusion: In addition to enhancing participant competency, the degree model described, which interlinks theory and practice, promotes organisational development through the implementation of projects undertaken under academic supervision. This has a double impact on the quality of medical follow-on training at the hospital where the participant is based, for not only is the individual's didactic competency enhanced, but so is the "learning organisation" as a whole as a result of continuous project orientation. PMID:29226220

  2. Initial Results of the Master's Degree Programme in "Leadership in Medicine" - Impact on hospital-based follow-on training of doctors.

    PubMed

    Wulfert, Chris-Henrik; Hoitz, Joachim; Senger, Ulrike

    2017-01-01

    Objective: This pilot project, which was jointly conducted by a hospital and a university, describes the development of the Master's Degree Programme in Leadership in Medicine, a course designed to supplement medical specialty training. The aim of the pilot project is to demonstrate how hospital-based projects on personnel and organisational development undertaken under academic supervision can be used to increase leadership responsibility among doctors whose duties include providing initial and follow-on training and to professionalise medical specialty training as a leadership task. This need arose from the nationwide requirements and an internal audit regarding follow-on training. The version of the degree programme described below aims to further the personnel development of the participants in the field of didactics. Method: Each of the nine modules is made up of two classroom-based phases and one distance learning phase. The distance learning phase involves undertaking hospital-based projects on personnel and organisational development under academic supervision. The pilot phase participants were hospital doctors who, as part of their duties, hold leadership responsibility or are involved in the follow-on training of doctors. Results: The 17 participants successfully implemented more than 30 hospital-based projects during the distance learning phases of the nine modules. These projects included the development of medical specialty curricula, relevant didactic methods and evaluation design and were subsequently presented and subjected to reflection in interdisciplinary groups. The project presentation together with the project report were regarded as proof of competency. Conclusion: In addition to enhancing participant competency, the degree model described, which interlinks theory and practice, promotes organisational development through the implementation of projects undertaken under academic supervision. This has a double impact on the quality of medical follow-on training at the hospital where the participant is based, for not only is the individual's didactic competency enhanced, but so is the "learning organisation" as a whole as a result of continuous project orientation.

  3. Successes and challenges of north–south partnerships – key lessons from the African/Asian Regional Capacity Development projects

    PubMed Central

    Färnman, Rosanna; Diwan, Vishal; Zwarenstein, Merrick; Atkins, Salla

    2016-01-01

    Introduction Increasing efforts are being made globally on capacity building. North–south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs) over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE) projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Design Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. Results The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north–south and south–south partnerships that evolved during the project were the main achievement. However, others found there to be a ‘north–south divide’ in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. Conclusion The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed appropriately for all partner institutions. Some challenges were underestimated from the beginning, and for such future projects, a more structured approach needs to be adopted. ARCADE partners learned that integrating courses into current university systems and awarding students credits are essential. PMID:27725080

  4. Successes and challenges of north-south partnerships - key lessons from the African/Asian Regional Capacity Development projects.

    PubMed

    Färnman, Rosanna; Diwan, Vishal; Zwarenstein, Merrick; Atkins, Salla

    2016-01-01

    Increasing efforts are being made globally on capacity building. North-south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs) over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE) projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north-south and south-south partnerships that evolved during the project were the main achievement. However, others found there to be a 'north-south divide' in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed appropriately for all partner institutions. Some challenges were underestimated from the beginning, and for such future projects, a more structured approach needs to be adopted. ARCADE partners learned that integrating courses into current university systems and awarding students credits are essential.

  5. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  6. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  7. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  8. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  9. Using Models to Teach Electricity--The CASTLE Project.

    ERIC Educational Resources Information Center

    Steinberg, Melvin S.; Wainwright, Camille L.

    1993-01-01

    Describes the Capacitor-Aided System for Teaching and Learning Electricity (CASTLE) project which is a high school electricity curriculum developed by high school and college physics teachers. The project is motivated by research on students' conceptual difficulties in electricity. The instructional materials developed allow students to challenge…

  10. Commercial Drivers License Workplace Literacy Project. Computer Training.

    ERIC Educational Resources Information Center

    Minnesota Teamsters Service Bureau, Minneapolis.

    These course outlines and instructor's guides were developed for a workplace literacy project conducted cooperatively through the Minnesota Teamsters Service Bureau and Northeast Metro Technical College. They are part of the job-specific curriculum for commercial truck drivers developed during the project. The beginning computer course introduces…

  11. Process Acceptance and Adoption by IT Software Project Practitioners

    ERIC Educational Resources Information Center

    Guardado, Deana R.

    2012-01-01

    This study addresses the question of what factors determine acceptance and adoption of processes in the context of Information Technology (IT) software development projects. This specific context was selected because processes required for managing software development projects are less prescriptive than in other, more straightforward, IT…

  12. 24 CFR 902.22 - Physical inspection of PHA projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Physical inspection of PHA projects... URBAN DEVELOPMENT PUBLIC HOUSING ASSESSMENT SYSTEM Physical Condition Indicator § 902.22 Physical inspection of PHA projects. (a) The inspection, generally. The PHA's score for the physical condition...

  13. 24 CFR 902.22 - Physical inspection of PHA projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Physical inspection of PHA projects... URBAN DEVELOPMENT PUBLIC HOUSING ASSESSMENT SYSTEM Physical Condition Indicator § 902.22 Physical inspection of PHA projects. (a) The inspection, generally. The PHA's score for the physical condition...

  14. 24 CFR 902.22 - Physical inspection of PHA projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Physical inspection of PHA projects... URBAN DEVELOPMENT PUBLIC HOUSING ASSESSMENT SYSTEM Physical Condition Indicator § 902.22 Physical inspection of PHA projects. (a) The inspection, generally. The PHA's score for the physical condition...

  15. 24 CFR 902.22 - Physical inspection of PHA projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Physical inspection of PHA projects... URBAN DEVELOPMENT PUBLIC HOUSING ASSESSMENT SYSTEM Physical Condition Indicator § 902.22 Physical inspection of PHA projects. (a) The inspection, generally. The PHA's score for the physical condition...

  16. Planned Change in Agrarian Countries.

    ERIC Educational Resources Information Center

    Niehoff, Arthur H.

    The report provides operationally relevant concepts and guidelines for persons responsible for planning and implementing development projects in agrarian countries. A framework for describing or evaluating the conduct of development projects is proposed, and applied to the results of an analysis of 203 case studies of past projects. Influences,…

  17. Regional demand and supply projections for outdoor recreation

    Treesearch

    Donald B. K. English; Carter J. Betz; J. Mark Young; John C. Bergstrom; H. Ken Cordell

    1993-01-01

    This paper develops regional recreation supply and demand projections, by combining coefficients from the national 1989 RPA Assessment models with regional regressor values. Regional recreation opportunity estimates also are developed, based on regional travel behavior. Results show important regional variations in projections of recreation opportunities, trip supply,...

  18. Project International Emphasis Interim Report, July 1991.

    ERIC Educational Resources Information Center

    Blois, Beverly, Ed.; Williams, Barbara

    Project International Emphasis (PIE), a curriculum development effort involving all 24 colleges in the Virginia Community College System (VCCS), focuses on the infusion of globally oriented components across the academic curriculum and in related career development programs. Activities undertaken during the project's first year included an annual…

  19. Storytelling Project. Southeast Asian Women's Alliance.

    ERIC Educational Resources Information Center

    de Barros, Judy; And Others

    Geared to refugee women, the storytelling project developed by the Refugee Women's Alliance (formerly the South East Asian Women's Alliance) in Seattle, Washington, combines language, cross-cultural, and family skills. The project included development of the storytelling curriculum for English-as-a-Second-Language students, training instructors,…

  20. 24 CFR 1003.302 - Project specific threshold requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project specific threshold requirements. 1003.302 Section 1003.302 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN... Purpose Grant Application and Selection Process § 1003.302 Project specific threshold requirements. (a...

  1. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  2. Development of Geography and Geology Terminology in British Sign Language

    NASA Astrophysics Data System (ADS)

    Meara, Rhian; Cameron, Audrey; Quinn, Gary; O'Neill, Rachel

    2016-04-01

    The BSL Glossary Project, run by the Scottish Sensory Centre at the University of Edinburgh focuses on developing scientific terminology in British Sign Language for use in the primary, secondary and tertiary education of deaf and hard of hearing students within the UK. Thus far, the project has developed 850 new signs and definitions covering Chemistry, Physics, Biology, Astronomy and Mathematics. The project has also translated examinations into BSL for students across Scotland. The current phase of the project has focused on developing terminology for Geography and Geology subjects. More than 189 new signs have been developed in these subjects including weather, rivers, maps, natural hazards and Geographical Information Systems. The signs were developed by a focus group with expertise in Geography and Geology, Chemistry, Ecology, BSL Linguistics and Deaf Education all of whom are deaf fluent BSL users.

  3. Leveraging object-oriented development at Ames

    NASA Technical Reports Server (NTRS)

    Wenneson, Greg; Connell, John

    1994-01-01

    This paper presents lessons learned by the Software Engineering Process Group (SEPG) from results of supporting two projects at NASA Ames using an Object Oriented Rapid Prototyping (OORP) approach supported by a full featured visual development environment. Supplemental lessons learned from a large project in progress and a requirements definition are also incorporated. The paper demonstrates how productivity gains can be made by leveraging the developer with a rich development environment, correct and early requirements definition using rapid prototyping, and earlier and better effort estimation and software sizing through object-oriented methods and metrics. Although the individual elements of OO methods, RP approach and OO metrics had been used on other separate projects, the reported projects were the first integrated usage supported by a rich development environment. Overall the approach used was twice as productive (measured by hours per OO Unit) as a C++ development.

  4. Improving the Automated Detection and Analysis of Secure Coding Violations

    DTIC Science & Technology

    2014-06-01

    eliminating software vulnerabilities and other flaws. The CERT Division produces books and courses that foster a security mindset in developers, and...website also provides a virtual machine containing a complete build of the Rosecheckers project on Linux . The Rosecheckers project leverages the...Compass/ROSE6 project developed at Law- rence Livermore National Laboratory. This project provides a high-level API for accessing the abstract syntax tree

  5. Evaluation of Free To Grow, Phase II: Detailed Profile of the Free To Grow Project in California. Final Report.

    ERIC Educational Resources Information Center

    Harrington, Mary

    The Free to Grow pilot project, developed by the Charles R. Drew University of Medicine and Science and its Head Start project, operated between 1994 and 1999. Following a 2-year planning and development stage, 5 project sites went on to complete the 3-year implementation phase in California, Colorado, Kentucky, New York, and Puerto Rico; the…

  6. 30 CFR 203.78 - Do I keep relief approved by MMS under §§ 203.60-203.77 for my lease, unit or project if prices...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Relief for Pre-Act Deep Water Leases and for Development and Expansion Projects § 203.78 Do I keep relief... the same development project or expansion project approved for royalty relief may have different price... your base gas price threshold set under paragraph (a) is $3.50 per million British thermal units (Btu...

  7. JPL - Small Power Systems Applications Project. [for solar thermal power plant development and commercialization

    NASA Technical Reports Server (NTRS)

    Ferber, R. R.; Marriott, A. T.; Truscello, V.

    1978-01-01

    The Small Power Systems Applications (SPSA) Project has been established to develop and commercialize small solar thermal power plants. The technologies of interest include all distributed and central receiver technologies which are potentially economically viable in power plant sizes of one to 10 MWe. The paper presents an overview of the SPSA Project and briefly discusses electric utility involvement in the Project.

  8. MIT/Draper Technology Development Partnership Project: Systems Analysis and On-Station Propulsion Subsystem Design.

    DTIC Science & Technology

    1998-08-04

    manufacturing Military and commercial applications Large market developing for multiple- satellite constellations Will have a high demand if...identified, and market assessments for five different possible projects are discussed. Lessons learned during the first semester of project work are...24 1.2.6 Market Assessments of Five Concepts 26 1.2.7 Project Selection 28 Chapter 2 Requirements Analysis and Top-Level System Architecture 30

  9. Relating Women's Experience and Skills to Competencies Required in Selected Occupations and Vocational Education Programs. Project Report, Task C1, Revised Competency Analysis: Credentialing Women's Life Experiences (Project ACCESS).

    ERIC Educational Resources Information Center

    Ekstrom, Ruth B.; And Others

    Competency scales were developed for 10 direct-entry occupations and 10 vocational education programs as part of Project ACCESS, a project to assess women's life experience learning for entrance into employment and for advanced placement in vocational education programs. Development of the occupational scales involved employer interviews, followed…

  10. The 17th Project Integration Meeting

    NASA Technical Reports Server (NTRS)

    Mcdonald, R. R.

    1981-01-01

    Progress made by the Low-Cost Solar Array Project during the period September 1980 to February 1981 is described. Included are reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering, and operations. A report on and copies of visual presentations made at the Project Integration Meeting held at Pasadena, California on February 4 and 5, 1981 are also included.

  11. Special Education Teacher Computer Literacy Training. Project STEEL. A Special Project To Develop and Implement a Computer-Based Special Teacher Education and Evaluation Laboratory. Volume II. Final Report.

    ERIC Educational Resources Information Center

    Frick, Theodore W.; And Others

    The document is part of the final report on Project STEEL (Special Teacher Education and Evaluation Laboratory) intended to extend the utilization of technology in the training of preservice special education teachers. This volume focuses on the second of four project objectives, the development of a special education teacher computer literacy…

  12. Tailoring a software production environment for a large project

    NASA Technical Reports Server (NTRS)

    Levine, D. R.

    1984-01-01

    A software production environment was constructed to meet the specific goals of a particular large programming project. These goals, the specific solutions as implemented, and the experiences on a project of over 100,000 lines of source code are discussed. The base development environment for this project was an ordinary PWB Unix (tm) system. Several important aspects of the development process required support not available in the existing tool set.

  13. Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.

  14. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  15. The automated ground network system

    NASA Technical Reports Server (NTRS)

    Smith, Miles T.; Militch, Peter N.

    1993-01-01

    The primary goal of the Automated Ground Network System (AGNS) project is to reduce Ground Network (GN) station life-cycle costs. To accomplish this goal, the AGNS project will employ an object-oriented approach to develop a new infrastructure that will permit continuous application of new technologies and methodologies to the Ground Network's class of problems. The AGNS project is a Total Quality (TQ) project. Through use of an open collaborative development environment, developers and users will have equal input into the end-to-end design and development process. This will permit direct user input and feedback and will enable rapid prototyping for requirements clarification. This paper describes the AGNS objectives, operations concept, and proposed design.

  16. Developing a stochastic traffic volume prediction model for public-private partnership projects

    NASA Astrophysics Data System (ADS)

    Phong, Nguyen Thanh; Likhitruangsilp, Veerasak; Onishi, Masamitsu

    2017-11-01

    Transportation projects require an enormous amount of capital investment resulting from their tremendous size, complexity, and risk. Due to the limitation of public finances, the private sector is invited to participate in transportation project development. The private sector can entirely or partially invest in transportation projects in the form of Public-Private Partnership (PPP) scheme, which has been an attractive option for several developing countries, including Vietnam. There are many factors affecting the success of PPP projects. The accurate prediction of traffic volume is considered one of the key success factors of PPP transportation projects. However, only few research works investigated how to predict traffic volume over a long period of time. Moreover, conventional traffic volume forecasting methods are usually based on deterministic models which predict a single value of traffic volume but do not consider risk and uncertainty. This knowledge gap makes it difficult for concessionaires to estimate PPP transportation project revenues accurately. The objective of this paper is to develop a probabilistic traffic volume prediction model. First, traffic volumes were estimated following the Geometric Brownian Motion (GBM) process. Monte Carlo technique is then applied to simulate different scenarios. The results show that this stochastic approach can systematically analyze variations in the traffic volume and yield more reliable estimates for PPP projects.

  17. Telescience Resource Kit Software Lifecycle

    NASA Technical Reports Server (NTRS)

    Griner, Carolyn S.; Schneider, Michelle

    1998-01-01

    The challenge of a global operations capability led to the Telescience Resource Kit (TReK) project, an in-house software development project of the Mission Operations Laboratory (MOL) at NASA's Marshall Space Flight Center (MSFC). The TReK system is being developed as an inexpensive comprehensive personal computer- (PC-) based ground support system that can be used by payload users from their home sites to interact with their payloads on board the International Space Station (ISS). The TReK project is currently using a combination of the spiral lifecycle model and the incremental lifecycle model. As with any software development project, there are four activities that can be very time consuming: Software design and development, project documentation, testing, and umbrella activities, such as quality assurance and configuration management. In order to produce a quality product, it is critical that each of these activities receive the appropriate amount of attention. For TReK, the challenge was to lay out a lifecycle and project plan that provides full support for these activities, is flexible, provides a way to deal with changing risks, can accommodate unknowns, and can respond to changes in the environment quickly. This paper will provide an overview of the TReK lifecycle, a description of the project's environment, and a general overview of project activities.

  18. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  19. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  20. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  1. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  2. Low Impact Development Master Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loftin, Samuel R.

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  3. The intelligent user interface for NASA's advanced information management systems

    NASA Technical Reports Server (NTRS)

    Campbell, William J.; Short, Nicholas, Jr.; Rolofs, Larry H.; Wattawa, Scott L.

    1987-01-01

    NASA has initiated the Intelligent Data Management Project to design and develop advanced information management systems. The project's primary goal is to formulate, design and develop advanced information systems that are capable of supporting the agency's future space research and operational information management needs. The first effort of the project was the development of a prototype Intelligent User Interface to an operational scientific database, using expert systems and natural language processing technologies. An overview of Intelligent User Interface formulation and development is given.

  4. The path to an experiment in space (from concept to flight)

    NASA Technical Reports Server (NTRS)

    Salzman, Jack A.

    1994-01-01

    The following are discussed in this viewgraph presentation on developing flight experiments for NASA's Microgravity Science and Applications Program: time from flight PI selection to launch; key flight experiment phases and schedule drivers; microgravity experiment definition/development process; definition and engineering development phase; ground-based reduced gravity research facilities; project organization; responsibilities and duties of principle investigator/co-investigators, project scientist, and project manager; the science requirements document; flight development phase; experiment cost and schedule; and keys to experiment success.

  5. Improving System Engineering Excellence at NASA's Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Takada, Pamela Wallace; Newton, Steve; Gholston, Sampson; Thomas, Dale (Technical Monitor)

    2001-01-01

    NASA's Marshall Space Flight Center (MSFC) management feels that sound system engineering practices are essential for successful project management, NASA studies have concluded that recent project failures could be attributed in part to inadequate systems engineering. A recent survey of MSFC project managers and system engineers' resulted in the recognition of a need for training in Systems Engineering Practices, particularly as they relate to MSFC projects. In response to this survey, an internal pilot short-course was developed to reinforce accepted practices for system engineering at MSFC. The desire of the MSFC management is to begin with in-house training and offer additional educational opportunities to reinforce sound system engineering principles to the more than 800 professionals who are involved with system engineering and project management. A Systems Engineering Development Plan (SEDP) has been developed to address the longer-term systems engineering development needs of MSFC. This paper describes the survey conducted and the training course that was developed in response to that survey.

  6. Implementing Extreme Programming in Distributed Software Project Teams: Strategies and Challenges

    NASA Astrophysics Data System (ADS)

    Maruping, Likoebe M.

    Agile software development methods and distributed forms of organizing teamwork are two team process innovations that are gaining prominence in today's demanding software development environment. Individually, each of these innovations has yielded gains in the practice of software development. Agile methods have enabled software project teams to meet the challenges of an ever turbulent business environment through enhanced flexibility and responsiveness to emergent customer needs. Distributed software project teams have enabled organizations to access highly specialized expertise across geographic locations. Although much progress has been made in understanding how to more effectively manage agile development teams and how to manage distributed software development teams, managers have little guidance on how to leverage these two potent innovations in combination. In this chapter, I outline some of the strategies and challenges associated with implementing agile methods in distributed software project teams. These are discussed in the context of a study of a large-scale software project in the United States that lasted four months.

  7. Morpheus Lander Testing Campaign

    NASA Technical Reports Server (NTRS)

    Hart, Jeremy J.; Mitchell, Jennifer D.

    2011-01-01

    NASA s Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing designed to serve as a testbed for advanced spacecraft technologies. The Morpheus vehicle has successfully performed a set of integrated vehicle test flights including hot-fire and tether tests, ultimately culminating in an un-tethered "free-flight" This development and testing campaign was conducted on-site at the Johnson Space Center (JSC), less than one year after project start. Designed, developed, manufactured and operated in-house by engineers at JSC, the Morpheus Project represents an unprecedented departure from recent NASA programs and projects that traditionally require longer development lifecycles and testing at remote, dedicated testing facilities. This paper documents the integrated testing campaign, including descriptions of test types (hot-fire, tether, and free-flight), test objectives, and the infrastructure of JSC testing facilities. A major focus of the paper will be the fast pace of the project, rapid prototyping, frequent testing, and lessons learned from this departure from the traditional engineering development process at NASA s Johnson Space Center.

  8. Investigating Information System Development, Behavior and Business Knowledge Impact on Project Success: Quantitative Analysis

    ERIC Educational Resources Information Center

    Skinner, Ann

    2018-01-01

    Resource-based theory provided the theoretical foundation to investigate the extent that developer knowledge correlated to success of information technology (IT) development projects. Literature indicated there was a knowledge gap in understanding whether developer information system development, behavior and business knowledge contributed to IT…

  9. 24 CFR 92.301 - Project-specific assistance to community housing development organizations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Project-specific assistance to community housing development organizations. 92.301 Section 92.301 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM...

  10. 24 CFR 570.209 - Guidelines for evaluating and selecting economic development projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Guidelines for evaluating and selecting economic development projects. 570.209 Section 570.209 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING...

  11. Scalable Data Management, Analysis, and Visualization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shen, Han-Wei

    This report is the entire final report for the SciDAC project authored by the whole team. OSU is part of the contributors to the report. This report is organized into sections and subsections, each covering an area of development and deployment of technologies applied to scientific applications of interest to the Department of Energy. Each sub-section includes: 1) a summary description of the research, development, and deployment carried out, the results and the extent to which the stated project objectives were met; 2) significant results, including major findings, developments, or conclusions; 3) products, such as publications and presentations, software developed,more » project website(s), technologies or techniques, inventions, awards, etc., and 4) conclusions of the projects and future directions for research, development, and deployment in this technology area.« less

  12. Project THEORIA: New Media for Values Education.

    ERIC Educational Resources Information Center

    Covey, Preston

    1989-01-01

    Describes Project THEORIA, which was developed at Carnegie Mellon University to design interactive simulation environments for testing hypotheses and theories of the arts and human morals. Three projects in various stages of design and development are described: (1) "A Right to Die?; (2) "Art or Forgery?"; and (3) "Birth or…

  13. 42 CFR 56.503 - Project elements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SERVICES Grants for Planning and Developing Migrant Health Programs § 56.503 Project elements. A project for the planning and development of a migrant health program supported under this subpart must: (a... an assessment of need of the population proposed to be served by the migrant health program for the...

  14. Early Identification Guidelines: Suburban Model (Lucas County School District).

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Educational Services.

    Developed by a suburban school district, this manual provides guidelines for the early identification of gifted preschool children and describes Project Unicorn, a project to conceptualize, plan, and implement a classroom curriculum model for gifted young children. Project activities were based on Jean Piaget's theory of cognitive development and…

  15. Low-cost Solar Array (LSA) project

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Progress made by the Low-Cost Silicon Solar Array Project during the period January through March 1978 is reported. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation materials testing and development, project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts.

  16. Helping Families Adjust to Economic Change. A Project Report.

    ERIC Educational Resources Information Center

    Matejic, Denise M.

    A project was developed to gain more insight into family financial problems, to identify these problems, and to formulate educational strategies to deal with and help solve these problems. This project was conducted in three phases, which included community outreach, development of educational materials, and evaluation. Three communities with…

  17. Contemporary Primary Science Curricula in the United Kingdom

    ERIC Educational Resources Information Center

    Henry, John A.

    1976-01-01

    Following a review of the impact of Piaget's theories of cognitive development on science curriculum design, the evolution and development of the Science 5/13 Project, designed to extend the work of Nuffield Junior Science Project, is described. Evaluation studies assessing the aims and objectives of this project are detailed. (BT)

  18. 23 CFR 450.330 - Project selection from the TIP.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... projects shall be jointly developed by the MPO, the State, and the public transportation operator(s) if requested by the MPO, the State, or the public transportation operator(s). If the State or public... the MPO, the State, and the public transportation operator(s) jointly develop expedited project...

  19. EUDISED Project: Present State and Development Prospects.

    ERIC Educational Resources Information Center

    Council for Cultural Cooperation, Strasbourg (France).

    A summary of the European Documentation and Information System for Education (EUDISED) March 1977 meeting describes the present state of the project and discussion of suggestions for future development. The preparatory phase of the project will be concluded in 1977 and ready for implementation; however, the present financial situation makes it…

  20. Contemporary India. Fulbright Summer Abroad Program 1987. Curriculum Project.

    ERIC Educational Resources Information Center

    Kneedler, Peter E.

    Consisting of an audio-visual series and study exercises for cooperative, interdependent learning opportunities, this curriculum project is designed to provide in-depth learning and to develop positive attitudes about India in junior high school students. The project can also be used to influence curriculum development and to acquaint teachers…

Top