26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil and gas wells, see... 26 Internal Revenue 3 2010-04-01 2010-04-01 false Intangible drilling and development costs in the...
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net productive and dry development wells drilled. (b) Definitions. For purposes of this Item 1205, the following... an oil or gas well. (2) A productive well is an exploratory, development, or extension well that is...
The Role of Well Control Training in Developing Safe Onshore and Offshore Oil Drilling Operations
ERIC Educational Resources Information Center
Abulhassn, Aber
2016-01-01
This research investigates the role of the International Well Control Forum (IWCF) Rotary Drilling Well Control Training Program in developing safe oil drilling operations from the perspective of onshore and offshore drilling crews. The research methodology is a qualitative case study. A total of 40 IWCF candidates were interviewed, with 10 from…
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2014 CFR
2014-04-01
... § 1.263(c)-1 Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil... 26 Internal Revenue 3 2014-04-01 2014-04-01 false Intangible drilling and development costs in the...
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2013 CFR
2013-04-01
... § 1.263(c)-1 Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil... 26 Internal Revenue 3 2013-04-01 2013-04-01 false Intangible drilling and development costs in the...
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2011 CFR
2011-04-01
... § 1.263(c)-1 Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil... 26 Internal Revenue 3 2011-04-01 2011-04-01 false Intangible drilling and development costs in the...
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2012 CFR
2012-04-01
... § 1.263(c)-1 Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil... 26 Internal Revenue 3 2012-04-01 2012-04-01 false Intangible drilling and development costs in the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fisher, E.K.; French, M.R.
East Cameron Block 278 Well B-12 was the first horizontal well drilled in the Gulf of Mexico. This gas well, located in the Texaco Inc. operated Eat Cameron 265 field, was drilled and completed in May 1990. The objective formation was a high-permeability, shallow, unconsolidated gas sand located about 1,450 ft below the mudline (BML). The success of this well proved that horizontal wells are viable alternatives to extended-reach development wells from offshore platforms in the Gulf of Mexico. The cost to drill and complete this horizontal well was less than comparable extended-reach development wells drilled in the same field.more » A minimal increase in drilling costs accompanied by considerable savings in completion costs resulted in favorable economics for the project. Drilling a shallow horizontal well in the Gulf of Mexico presented several challenges. This paper discusses prewell planning, formulation of contingency plans, and implementation of a drilling/completion program designed to meet these challenges.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Staller, G.E.; Westmoreland, J.J.; Whitlow, G.L.
1998-03-01
Lost circulation, which is the loss of well drilling fluids to the formation while drilling, is a common problem encountered while drilling geothermal wells. The rapid detection of the loss of well drilling fluids is critical to the successful and cost-effective treatment of the wellbore to stop or minimize lost circulation. Sandia National Laboratories has developed an instrument to accurately measure the outflow rate of drilling fluids while drilling. This instrument, the Rolling Float Meter, has been under development at Sandia since 1991 and is now available for utilization by interested industry users. This report documents recent Rolling Float Metermore » design upgrades resulting from field testing and industry input, the effects of ongoing testing and evaluation both in the laboratory and in the field, and the final design package that is available to transfer this technology to industry users.« less
Geothermal well drilling manual at Cerro Prieto
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fernandez P., A.; Flores S., M.
The objective of the drilling manual is to solve all problems directly related to drilling during the construction of a well. In this case, the topics dealt which are drilling fluids and hydraulics to be applied in the field to improve drilling progress, eliminate risks and achieve good well-completion. There are other topics that are applicable such as drill bits and the drilling string, which are closely linked to drilling progress. On this occasion drilling fluid and hydraulics programs are presented, in addition to a computing program for a Casio FX-502P calculator to be applied in the field to optimizemore » hydraulics and in the analysis of hydraulics for development and exploration wells at their different intervals.« less
Research and application of borehole structure optimization based on pre-drill risk assessment
NASA Astrophysics Data System (ADS)
Zhang, Guohui; Liu, Xinyun; Chenrong; Hugui; Yu, Wenhua; Sheng, Yanan; Guan, Zhichuan
2017-11-01
Borehole structure design based on pre-drill risk assessment and considering risks related to drilling operation is the pre-condition for safe and smooth drilling operation. Major risks of drilling operation include lost circulation, blowout, sidewall collapsing, sticking and failure of drilling tools etc. In the study, studying data from neighboring wells was used to calculate the profile of formation pressure with credibility in the target well, then the borehole structure design for the target well assessment by using the drilling risk assessment to predict engineering risks before drilling. Finally, the prediction results were used to optimize borehole structure design to prevent such drilling risks. The newly-developed technique provides a scientific basis for lowering probability and frequency of drilling engineering risks, and shortening time required to drill a well, which is of great significance for safe and high-efficient drilling.
High Temperature 300°C Directional Drilling System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chatterjee, Kamalesh; Aaron, Dick; Macpherson, John
2015-07-31
Many countries around the world, including the USA, have untapped geothermal energy potential. Enhanced Geothermal Systems (EGS) technology is needed to economically utilize this resource. Temperatures in some EGS reservoirs can exceed 300°C. To effectively utilize EGS resources, an array of injector and production wells must be accurately placed in the formation fracture network. This requires a high temperature directional drilling system. Most commercial services for directional drilling systems are rated for 175°C while geothermal wells require operation at much higher temperatures. Two U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) projects have been initiated to develop a 300°Cmore » capable directional drilling system, the first developing a drill bit, directional motor, and drilling fluid, and the second adding navigation and telemetry systems. This report is for the first project, “High Temperature 300°C Directional Drilling System, including drill bit, directional motor and drilling fluid, for enhanced geothermal systems,” award number DE-EE0002782. The drilling system consists of a drill bit, a directional motor, and drilling fluid. The DOE deliverables are three prototype drilling systems. We have developed three drilling motors; we have developed four roller-cone and five Kymera® bits; and finally, we have developed a 300°C stable drilling fluid, along with a lubricant additive for the metal-to-metal motor. Metal-to-metal directional motors require coatings to the rotor and stator for wear and corrosion resistance, and this coating research has been a significant part of the project. The drill bits performed well in the drill bit simulator test, and the complete drilling system has been tested drilling granite at Baker Hughes’ Experimental Test Facility in Oklahoma. The metal-to-metal motor was additionally subjected to a flow loop test in Baker Hughes’ Celle Technology Center in Germany, where it ran for more than 100 hours.« less
Summary: High Temperature Downhole Motor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raymond, David W.
2017-10-01
Directional drilling can be used to enable multi-lateral completions from a single well pad to improve well productivity and decrease environmental impact. Downhole rotation is typically developed with a motor in the Bottom Hole Assembly (BHA) that develops drilling power (speed and torque) necessary to drive rock reduction mechanisms (i.e., the bit) apart from the rotation developed by the surface rig. Historically, wellbore deviation has been introduced by a “bent-sub,” located in the BHA, that introduces a small angular deviation, typically less than 3 degrees, to allow the bit to drill off-axis with orientation of the BHA controlled at themore » surface. The development of a high temperature downhole motor would allow reliable use of bent subs for geothermal directional drilling. Sandia National Laboratories is pursuing the development of a high temperature motor that will operate on either drilling fluid (water-based mud) or compressed air to enable drilling high temperature, high strength, fractured rock. The project consists of designing a power section based upon geothermal drilling requirements; modeling and analysis of potential solutions; and design, development and testing of prototype hardware to validate the concept. Drilling costs contribute substantially to geothermal electricity production costs. The present development will result in more reliable access to deep, hot geothermal resources and allow preferential wellbore trajectories to be achieved. This will enable development of geothermal wells with multi-lateral completions resulting in improved geothermal resource recovery, decreased environmental impact and enhanced well construction economics.« less
A new drilling method-Earthworm-like vibration drilling.
Wang, Peng; Ni, Hongjian; Wang, Ruihe
2018-01-01
The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed "earthworm-like drilling" is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a "soft-string" model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This paper reports that Phillips Petroleum Co. has an active drilling program in northern Cook inlet 35 miles west of Anchorage, including delineation of an oil field of undetermined size. Phillips is drilling the well from its Tannic platform, built in 1968 to develop North Cook Inlet gas field. Phillips said it might drill another well in March 1993. A plan Phillips field with the state said the company has the capability of drilling 12 oil wells from the Tyonek platform. Depending on results of the 2 Sunfish well, the 12 wells could be drilled from 1992 through March 1995more » at a rate of one well about every 75 days, the company said.« less
A Novel Well Drill Assisted with High-Frequency Vibration Using the Bending Mode
Qi, Xinda; Chen, Weishan; Tang, Xintian; Shi, Shengjun
2018-01-01
It is important for companies to increase the efficiency of drilling as well as prolong the lifetime of the drilling tool. Since some previous investigations indicated that a superposition of well drilling with an additional vibration increases the drilling efficiency, this paper introduces a novel well drill which is assisted with additional vibrations by means of piezoelectric sandwich bending vibration transducer. The proposed drill uses bending vibrations in two different directions to from an elliptical trajectory movement, which can help the drill to break the surface of hard material more efficiently and clean away the lithic fragments more easily. The proposed well drill with bending vibration transducer is designed to have a resonance frequency of the first bending vibration mode of about 1779 Hz. The motion equation of the particle on the edge of the drill bit is developed and analyzed. The vibration trajectory of the particle on the edge of the drill bit is calculated by using finite element method. A prototype of the proposed drill using bending vibrations is fabricated and tested to verify the aim of drilling efficiency increase. The feed speed of the vibration assisted drilling is tested to be about 0.296 mm/s when the excitation voltage of the transducer is 300 V, while this speed decreases to about 0.195 mm/s when no vibration is added. This comparison shows that the feed speed of the vibration assisted drilling is about 52% higher than that of the normal drilling, which means the proposed drill has a better efficiency and it is important to consider vibration superimposition in well drilling. In addition, the surface of the drill hole gained by the vibration assisted drilling is smoother than that of the normal drilling, which makes the clearance easier. PMID:29641481
Resonance: The science behind the art of sonic drilling
NASA Astrophysics Data System (ADS)
Lucon, Peter Andrew
The research presented in this dissertation quantifies the system dynamics and the influence of control variables of a sonic drill system. The investigation began with an initial body of work funded by the Department of Energy under a Small Business Innovative Research Phase I Grant, grant number: DE-FG02-06ER84618, to investigate the feasibility of using sonic drills to drill micro well holes to depths of 1500 feet. The Department of Energy funding enabled feasibility testing using a 750 hp sonic drill owned by Jeffery Barrow, owner of Water Development Co. During the initial feasibility testing, data was measured and recorded at the sonic drill head while the sonic drill penetrated to a depth of 120 feet. To demonstrate feasibility, the system had to be well understood to show that testing of a larger sonic drill could simulate the results of drilling a micro well hole of 2.5 inch diameter. A first-order model of the system was developed that produced counter-intuitive findings that enabled the feasibility of using this method to drill deeper and produce micro-well holes to 1500 feet using sonic drills. Although funding was not continued, the project work continued. This continued work expanded on the sonic drill models by understanding the governing differential equation and solving the boundary value problem, finite difference methods, and finite element methods to determine the significance of the control variables that can affect the sonic drill. Using a design of experiment approach and commercially available software, the significance of the variables to the effectiveness of the drill system were determined. From the significant variables, as well as the real world testing, a control system schematic for a sonic drill was derived and is patent pending. The control system includes sensors, actuators, personal logic controllers, as well as a human machine interface. It was determined that the control system should control the resonant mode and the weight on the bit as the primary two control variables. The sonic drill can also be controlled using feedback from sensors mounted on the sonic drill head, which is the driver for the sonic drill located above ground
Drill System Development for the Lunar Subsurface Exploration
NASA Astrophysics Data System (ADS)
Zacny, Kris; Davis, Kiel; Paulsen, Gale; Roberts, Dustyn; Wilson, Jack; Hernandez, Wilson
Reaching the cold traps at the lunar poles and directly sensing the subsurface regolith is a primary goal of lunar exploration, especially as a means of prospecting for future In Situ Resource Utilization efforts. As part of the development of a lunar drill capable of reaching a depth of two meters or more, Honeybee Robotics has built a laboratory drill system with a total linear stroke of 1 meter, capability to produce as much as 45 N-m of torque at a rotational speed of 200 rpm, and a capability of delivering maximum downforce of 1000 N. Since this is a test-bed, the motors were purposely chosen to be relative large to provide ample power to the drill system (the Apollo drill was a 500 Watt drill, i.e. not small in current standards). In addition, the drill is capable of using three different drilling modes: rotary, rotary percussive and percussive. The frequency of percussive impact can be varied if needed while rotational speed can be held constant. An integral part of this test bed is a vacuum chamber that is currently being constructed. The drill test-bed is used for analyzing various drilling modes and testing different drill bit and auger systems under low pressure conditions and in lunar regolith simulant. The results of the tests are used to develop final lunar drill design as well as efficient drilling protocols. The drill was also designed to accommodate a downhole neutron spectrometer for measuring the amount of hydrated material in the area surrounding the borehole, as well as downhole temperature sensors, accelerometers, and electrical properties tester. The presentation will include history of lunar drilling, challenges of drilling on the Moon, a description of the drill and chamber as well as preliminary drilling test results conducted in the ice-bound lunar regolith simulant with a variety of drill bits and augers systems.
HIGH-POWER TURBODRILL AND DRILL BIT FOR DRILLING WITH COILED TUBING
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Radtke; David Glowka; Man Mohan Rai
2008-03-31
Commercial introduction of Microhole Technology to the gas and oil drilling industry requires an effective downhole drive mechanism which operates efficiently at relatively high RPM and low bit weight for delivering efficient power to the special high RPM drill bit for ensuring both high penetration rate and long bit life. This project entails developing and testing a more efficient 2-7/8 in. diameter Turbodrill and a novel 4-1/8 in. diameter drill bit for drilling with coiled tubing. The high-power Turbodrill were developed to deliver efficient power, and the more durable drill bit employed high-temperature cutters that can more effectively drill hardmore » and abrasive rock. This project teams Schlumberger Smith Neyrfor and Smith Bits, and NASA AMES Research Center with Technology International, Inc (TII), to deliver a downhole, hydraulically-driven power unit, matched with a custom drill bit designed to drill 4-1/8 in. boreholes with a purpose-built coiled tubing rig. The U.S. Department of Energy National Energy Technology Laboratory has funded Technology International Inc. Houston, Texas to develop a higher power Turbodrill and drill bit for use in drilling with a coiled tubing unit. This project entails developing and testing an effective downhole drive mechanism and a novel drill bit for drilling 'microholes' with coiled tubing. The new higher power Turbodrill is shorter, delivers power more efficiently, operates at relatively high revolutions per minute, and requires low weight on bit. The more durable thermally stable diamond drill bit employs high-temperature TSP (thermally stable) diamond cutters that can more effectively drill hard and abrasive rock. Expectations are that widespread adoption of microhole technology could spawn a wave of 'infill development' drilling of wells spaced between existing wells, which could tap potentially billions of barrels of bypassed oil at shallow depths in mature producing areas. At the same time, microhole coiled tube drilling offers the opportunity to dramatically cut producers' exploration risk to a level comparable to that of drilling development wells. Together, such efforts hold great promise for economically recovering a sizeable portion of the estimated remaining shallow (less than 5,000 feet subsurface) oil resource in the United States. The DOE estimates this U.S. targeted shallow resource at 218 billion barrels. Furthermore, the smaller 'footprint' of the lightweight rigs utilized for microhole drilling and the accompanying reduced drilling waste disposal volumes offer the bonus of added environmental benefits. DOE analysis shows that microhole technology has the potential to cut exploratory drilling costs by at least a third and to slash development drilling costs in half.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McLellan, G.W.
This test plan describes the field demonstration of the sonic drilling system being conducted as a coordinated effort between the VOC-Arid ID (Integrated Demonstration) and the 200 West Area Carbon Tetrachloride ERA (Expedited Response Action) programs at Hanford. The purpose of this test is to evaluate the Water Development Corporation`s drilling system, modify components as necessary and determine compatible drilling applications for the sonic drilling method for use at facilities in the DOE complex. The sonic demonstration is being conducted as the first field test under the Cooperative Research and Development Agreement (CRADA) which involves the US Department of Energy,more » Pacific Northwest Laboratory, Westinghouse Hanford Company and Water Development Corporation. The sonic drilling system will be used to drill a 45 degree vadose zone well, two vertical wells at the VOC-Arid ID site, and several test holes at the Drilling Technology Test Site north of the 200 Area fire station. Testing at other locations will depend on the performance of the drilling method. Performance of this technology will be compared to the baseline drilling method (cable-tool).« less
A new drilling method—Earthworm-like vibration drilling
Wang, Peng; Wang, Ruihe
2018-01-01
The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed “earthworm-like drilling” is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a “soft-string” model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling. PMID:29641615
25 CFR 213.33 - Diligence and prevention of waste.
Code of Federal Regulations, 2011 CFR
2011-04-01
... prevention of waste. The lessee shall exercise diligence in drilling and operating wells for oil and gas on... prevention of waste of oil or gas developed on the land, or the entrance of water through wells drilled by... the same and to shut off effectually all water from the oil or gas-bearing strata; not drill any well...
25 CFR 213.33 - Diligence and prevention of waste.
Code of Federal Regulations, 2014 CFR
2014-04-01
... prevention of waste. The lessee shall exercise diligence in drilling and operating wells for oil and gas on... prevention of waste of oil or gas developed on the land, or the entrance of water through wells drilled by... the same and to shut off effectually all water from the oil or gas-bearing strata; not drill any well...
25 CFR 213.33 - Diligence and prevention of waste.
Code of Federal Regulations, 2012 CFR
2012-04-01
... prevention of waste. The lessee shall exercise diligence in drilling and operating wells for oil and gas on... prevention of waste of oil or gas developed on the land, or the entrance of water through wells drilled by... the same and to shut off effectually all water from the oil or gas-bearing strata; not drill any well...
Field testing advanced geothermal turbodrill (AGT). Phase 1 final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maurer, W.C.; Cohen, J.H.
1999-06-01
Maurer Engineering developed special high-temperature geothermal turbodrills for LANL in the 1970s to overcome motor temperature limitations. These turbodrills were used to drill the directional portions of LANL`s Hot Dry Rock Geothermal Wells at Fenton Hill, New Mexico. The Hot Dry Rock concept is to drill parallel inclined wells (35-degree inclination), hydraulically fracture between these wells, and then circulate cold water down one well and through the fractures and produce hot water out of the second well. At the time LANL drilled the Fenton Hill wells, the LANL turbodrill was the only motor in the world that would drill atmore » the high temperatures encountered in these wells. It was difficult to operate the turbodrills continuously at low speed due to the low torque output of the LANL turbodrills. The turbodrills would stall frequently and could only be restarted by lifting the bit off bottom. This allowed the bit to rotate at very high speeds, and as a result, there was excessive wear in the bearings and on the gauge of insert roller bits due to these high rotary speeds. In 1998, Maurer Engineering developed an Advanced Geothermal Turbodrill (AGT) for the National Advanced Drilling and Excavation Technology (NADET) at MIT by adding a planetary speed reducer to the LANL turbodrill to increase its torque and reduce its rotary speed. Drilling tests were conducted with the AGT using 12 1/2-inch insert roller bits in Texas Pink Granite. The drilling tests were very successful, with the AGT drilling 94 ft/hr in Texas Pink Granite compared to 45 ft/hr with the LANL turbodrill and 42 ft/hr with a rotary drill. Field tests are currently being planned in Mexico and in geothermal wells in California to demonstrate the ability of the AGT to increase drilling rates and reduce drilling costs.« less
43 CFR 3137.71 - What must I do to meet continuing development obligations?
Code of Federal Regulations, 2011 CFR
2011-10-01
... following operations— (1) Drilling, testing, or completing additional wells to the primary target or other...; (3) Recompleting wells or other operations that establish new unit production; or (4) Drilling existing wells to a deeper target. (b) No later than 90 calendar days after meeting initial development...
43 CFR 3137.71 - What must I do to meet continuing development obligations?
Code of Federal Regulations, 2012 CFR
2012-10-01
... following operations— (1) Drilling, testing, or completing additional wells to the primary target or other...; (3) Recompleting wells or other operations that establish new unit production; or (4) Drilling existing wells to a deeper target. (b) No later than 90 calendar days after meeting initial development...
43 CFR 3137.71 - What must I do to meet continuing development obligations?
Code of Federal Regulations, 2014 CFR
2014-10-01
... following operations— (1) Drilling, testing, or completing additional wells to the primary target or other...; (3) Recompleting wells or other operations that establish new unit production; or (4) Drilling existing wells to a deeper target. (b) No later than 90 calendar days after meeting initial development...
43 CFR 3137.71 - What must I do to meet continuing development obligations?
Code of Federal Regulations, 2013 CFR
2013-10-01
... following operations— (1) Drilling, testing, or completing additional wells to the primary target or other...; (3) Recompleting wells or other operations that establish new unit production; or (4) Drilling existing wells to a deeper target. (b) No later than 90 calendar days after meeting initial development...
State-of-the-art in coalbed methane drilling fluids
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baltoiu, L.V.; Warren, B.K.; Natras, T.A.
2008-09-15
The production of methane from wet coalbeds is often associated with the production of significant amounts of water. While producing water is necessary to desorb the methane from the coal, the damage from the drilling fluids used is difficult to assess, because the gas production follows weeks to months after the well is drilled. Commonly asked questions include the following: What are the important parameters for drilling an organic reservoir rock that is both the source and the trap for the methane? Has the drilling fluid affected the gas production? Are the cleats plugged? Does the 'filtercake' have an impactmore » on the flow of water and gas? Are stimulation techniques compatible with the drilling fluids used? This paper describes the development of a unique drilling fluid to drill coalbed methane wells with a special emphasis on horizontal applications. The fluid design incorporates products to match the delicate surface chemistry on the coal, a matting system to provide both borehole stability and minimize fluid losses to the cleats, and a breaker method of removing the matting system once drilling is completed. This paper also discusses how coal geology impacts drilling planning, drilling practices, the choice of drilling fluid, and completion/stimulation techniques for Upper Cretaceous Mannville-type coals drilled within the Western Canadian Sedimentary Basin. A focus on horizontal coalbed methane (CBM) wells is presented. Field results from three horizontal wells are discussed, two of which were drilled with the new drilling fluid system. The wells demonstrated exceptional stability in coal for lengths to 1000 m, controlled drilling rates and ease of running slotted liners. Methods for, and results of, placing the breaker in the horizontal wells are covered in depth.« less
Review-Esso Resources Canada Ltd. , Norman Wells expansion project drilling program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaef, D.G.
Esso Resources Canada Limited has embarked on a project to increase production from its Norman Wells Oil field located 145 km south of the Arctic Circle, from 475 m/sup 3//D to 4000 m/sup 3//D of crude oil. This paper provides details on the development drilling portion of the project which is comprised of 150 wells to be drilled in 3 years utilizing 2 drilling rigs from July 1982 through September 1985. The majority of the wells will be directionally drilled from multiwell land pads and artificial islands to shallow reservoir targets underlying the Mackenzie River, a major river intersecting themore » field boundaries. Experience from the initial 27 wells completed is provided.« less
Application of air hammer drilling technology in igneous rocks of Junggar basin
NASA Astrophysics Data System (ADS)
Zhao, Hongshan; Feng, Guangtong; Yu, Haiye
2018-03-01
There were many technical problems such as serious well deviation, low penetration rate and long drilling cycle in igneous rocks because of its hardness, strong abrasive and poor drillability, which severely influenced the exploration and development process of Junggar basin. Through analyzing the difficulties of gas drilling with roller bits in Well HS 2, conducting the mechanics experiments about igneous rock, and deeply describing the rock-breaking mechanism of air hammer drilling and its adaptability in igneous rocks, air hammer drilling can realize deviation control and fast drilling in igneous rocks of piedmont zone and avoid the wear and fatigue fracture of drilling strings due to its characteristics of low WOB, low RPM and high frequency impact. Through firstly used in igneous rocks of Well HS 201, compared with gas drilling with cone bit, the average penetration rate and one-trip footage of air hammer drilling respectively increased by more than 2.45 times and 6.42 times while the well deviation was always controlled less than 2 degrees. Two records for Block HS were set up such as the fastest penetration rate of 14.29m/h in Φ444.5mm well hole and the highest one-trip footage of 470.62m in Φ311.2mm well hole. So air hammer drilling was an effective way to realize optimal and fast drilling in the igneous rock formation of Junggar basin.
Case history of an opposed-bore, dual horizontal well in the Austin Chalk formation of south Texas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cooney, M.F.; Rogers, C.T.; Stacey, E.S.
1993-03-01
Petro-Hunt Corp. used a unique horizontal-well design to optimize development of an irregularly shaped lease in the Austin chalk formation in Texas. Two medium-radius horizontal bores were drilled in opposite directions from one vertical hole to maximize horizontal displacement in the lease. Underbalanced drilling techniques were used to prevent formation damage. The well design resulted in a significant cost savings per horizontal foot compared with 24 offset wells that the operator drilled. This paper reviews well planning and drilling and emphasizes techniques used to intersect thin horizontal targets and to initiate the second horizontal bore. Production results and drilling economicsmore » are discussed briefly, and ideas on future dual-horizontal-well applications are presented.« less
NASA Astrophysics Data System (ADS)
Chaurasia, Pratik Ranjan; Subhash
2018-06-01
An unknown indigenous driller combined the percussion and circulation drilling principles, resulting in the development of low cost, low weight manual boring set in the year 1990-1991/1991-1992, which revolutionized the shallow well drilling technology and made possible to drill about 4.5 million shallow bore wells in the State. This has changed the landscape of irrigated agriculture, changing the life of millions of small and marginal farmers and contributed a lot in increasing crop production and crop productivity. The developed drilling equipment locally known as "Pressure Boring Set" is manually operated, low cost and can be transported on bicycles. Drilling cost is also less. This low cost and simple technology made it possible to drill large number of shallow bore wells in comparatively short time span and less cost, consequently enhancing the rate of increase in irrigated area and in turn crop production and productivity. Cost of the boring set is also low, as compared to traditional sand pump hand boring set and suitable for alluvial areas.
NASA Astrophysics Data System (ADS)
Chaurasia, Pratik Ranjan; Subhash
2018-02-01
An unknown indigenous driller combined the percussion and circulation drilling principles, resulting in the development of low cost, low weight manual boring set in the year 1990-1991/1991-1992, which revolutionized the shallow well drilling technology and made possible to drill about 4.5 million shallow bore wells in the State. This has changed the landscape of irrigated agriculture, changing the life of millions of small and marginal farmers and contributed a lot in increasing crop production and crop productivity. The developed drilling equipment locally known as "Pressure Boring Set" is manually operated, low cost and can be transported on bicycles. Drilling cost is also less. This low cost and simple technology made it possible to drill large number of shallow bore wells in comparatively short time span and less cost, consequently enhancing the rate of increase in irrigated area and in turn crop production and productivity. Cost of the boring set is also low, as compared to traditional sand pump hand boring set and suitable for alluvial areas.
NASA Astrophysics Data System (ADS)
Banz, B.; Bohling, G.; Doveton, J.
2008-12-01
Traditional programs of geological education continue to be focused primarily on the evaluation of surface or near-surface geology accessed at outcrops and shallow boreholes. However, most students who graduate to careers in geology work almost entirely on subsurface problems, interpreting drilling records and petrophysical logs from exploration and production wells. Thus, college graduates commonly find themselves ill-prepared when they enter the petroleum industry and require specialized training in drilling and petrophysical log interpretation. To aid in this training process, we are developing an environment for interactive instruction in the geological aspects of petroleum reservoir characterization employing a virtual subsurface closely reflecting the geology of the US mid-continent, in the fictional setting of Small County, Kansas. Stochastic simulation techniques are used to generate the subsurface characteristics, including the overall geological structure, distributions of facies, porosity, and fluid saturations, and petrophysical logs. The student then explores this subsurface by siting exploratory wells and examining drilling and petrophysical log records obtained from those wells. We are developing the application using the Eclipse Rich Client Platform, which allows for the rapid development of a platform-agnostic application while providing an immersive graphical interface. The application provides an array of views to enable relevant data display and student interaction. One such view is an interactive map of the county allowing the student to view the locations of existing well bores and select pertinent data overlays such as a contour map of the elevation of an interesting interval. Additionally, from this view a student may choose the site of a new well. Another view emulates a drilling log, complete with drilling rate plot and iconic representation of examined drill cuttings. From here, students are directed to stipulate subsurface lithology and interval tops as they progress through the drilling operation. Once the interpretation process is complete, the student is guided through an exercise emulating a drill stem test and then is prompted to decide on perforation intervals. The application provides a graphical framework by which the student is guided through well site selection, drilling data interpretation, and well completion or dry-hole abandonment, creating a tight feedback loop by which the student gains an over-arching view of drilling logistics and the subsurface data evaluation process.
30 CFR 256.71 - Directional drilling.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Directional drilling. 256.71 Section 256.71..., and Extensions § 256.71 Directional drilling. In accordance with an approved exploration plan or development and production plan, a lease may be maintained in force by directional wells drilled under the...
Vega is first offshore development for Montedison
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-10-01
Montedison's Vega field, 15 miles off the southern tip of Sicily, has recoverable oil reserves of 400 million bbl. This is Montedison's first offshore development venture, although the operator has considerable onshore experience. It will be followed by a second field, the smaller Mila floating production system, also off Sicily. One platform will be placed on a template installed in 1983 with up to 18 pre-drilled wells in water depths of 480 ft. The field may hold up to 1 billion bbl of 16/sup 0/ crude, but geology is complex and heavily fractured. The template has 30 available drilling slots,more » and water injection is being considered. The Vega discovery well was drilled in 1980, with 5000 b/d tested from 1000-ft oil column in Strep-penosa shales. Subsequently five wells were drilled by the Glomar Biscay I semi. These wells were drilled to a depth of just over 8000 ft with a total deviation of 60/sup 0/. The template is the first in the Mediterranean.« less
Coso: Example of a Complex Geothermal Reservoir.
1985-09-01
regarding the structural setting, origin, and internal structure of this energy resource. Because of accelerating exploration and development drilling that is... drilling targets and productivity estimates that can be tested as the resource is developed. Like virtually all resources, Coso will be drilled and tested...73 47. Idealized Cross Section Through Red Mountain Type of Pipe ................... 74 48. Results of Drilling Wells 75-7, 75A-7, 75B-7, 15-8, and
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steve McRae; Thomas Walsh; Michael Dunn
2010-02-22
In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrowmore » Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.« less
NASA Astrophysics Data System (ADS)
Freudenthal, Tim; Bergenthal, Markus; Bohrmann, Gerhard; Pape, Thomas; Kopf, Achim; Huhn-Frehers, Katrin; Gohl, Karsten; Wefer, Gerold
2017-04-01
The MARUM-MeBo (abbreviation for Meeresboden-Bohrgerät, the German expression for seafloor drill rig) is a robotic drilling system that is developed since 2004 at the MARUM Center for Marine Environmental Sciences at the University of Bremen in close cooperation with Bauer Maschinen GmbH and other industry partners. The MARUM-MeBo drill rigs can be deployed from multipurpose research vessel like, RV MARIA S. MERIAN, RV METEOR, RV SONNE and RV POLARSTERN and are used for getting long cores both in soft sediments as well as hard rocks in the deep sea. The first generation drill rig, the MARUM-MeBo70 is dedicated for a drilling depth of more than 70 m (Freudenthal and Wefer, 2013). Between 2005 and 2016 it was deployed on 17 research expeditions and drilled about 3 km into different types of geology including carbonate and crystalline rocks, gas hydrates, glacial tills, sands and gravel, glacial till and hemipelagic mud with an average recovery rate of about 70 %. We used the development and operational experiences of MARUM-MeBo70 for the development of a second generation drill rig MARUM-MeBo200. This drill rig is dedicated for conducting core drilling down to 200 m below sea floor. After successful sea trials in the North Sea in October 2014 the MeBo200 was used on a scientific expedition on the research vessel RV SONNE (SO247) in March/April 2016. During 12 deployments we drilled altogether 514 m in hemipelagic sediments with volcanic ashes as well as in muddy and sandy slide deposits off New Zealand. The average core recovery was about 54%. The maximum drilling depth was 105 m below sea floor. Developments for the MeBo drilling technology include the development of a pressure core barrel that was successfully deployed on two research expeditions so far. Bore hole logging adds to the coring capacity. Several autonomous logging probes have been developed in the last years for a deployment with MeBo in the logging while tripping mode - a sonic probe measuring in situ p-wave velocity being the latest development. Various bore hole monitoring systems where developed and deployed with the MeBo system. They allow for long-term monitoring of pressure variability within the sealed bore holes. References: Freudenthal, T and Wefer, G (2013) Drilling cores on the sea floor with the remote-controlled sea floor drilling rig MeBo. Geoscientific Instrumentation, Methods and Data Systems, 2(2). 329-337. doi:10.5194/gi-2-329-2013
Problems of deep drilling in abnormally pressured zones of the Kara Sea continental shelf
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simonov, V.I.
1996-12-31
There are discussed results of drilling operations in shelf hydrocarbon areas of the Far North of Tyumen Region (Kharassavieskaya, Bovanenkovskaya and Krusenshternskaya ones) and on the Bely Island. The author describes equipment and technologies used, problems arising in the process of operations and possible ways of solving them. Application of the results discussed in the report seems rather attractive in connection with possible realization of joint projects on development of the mentioned areas. Thus, Amoco Eurasia plans to participate in development of Bovanenkovskoye and Novoportovskoye fields. Well planning for Amoco has been done of specialists of ZapSibBurNIPI. Experience of Russianmore » drilling companies in the Yamal area (Far North of Tyumen Region) has proved that well planning for shelf areas requires special attention as drilling-in both overpressured zones (Bovanenkovskoye field) and underpressured ones (Novoportovskoye field) is done actually in balance. Investigated are reasons for such drilling problems as kicks and lost circulation. Taking them into consideration will help to decrease considerably the cost of well drilling in shelf areas.« less
Counter-Rotating Tandem Motor Drilling System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kent Perry
2009-04-30
Gas Technology Institute (GTI), in partnership with Dennis Tool Company (DTC), has worked to develop an advanced drill bit system to be used with microhole drilling assemblies. One of the main objectives of this project was to utilize new and existing coiled tubing and slimhole drilling technologies to develop Microhole Technology (MHT) so as to make significant reductions in the cost of E&P down to 5000 feet in wellbores as small as 3.5 inches in diameter. This new technology was developed to work toward the DOE's goal of enabling domestic shallow oil and gas wells to be drilled inexpensively comparedmore » to wells drilled utilizing conventional drilling practices. Overall drilling costs can be lowered by drilling a well as quickly as possible. For this reason, a high drilling rate of penetration is always desired. In general, high drilling rates of penetration (ROP) can be achieved by increasing the weight on bit and increasing the rotary speed of the bit. As the weight on bit is increased, the cutting inserts penetrate deeper into the rock, resulting in a deeper depth of cut. As the depth of cut increases, the amount of torque required to turn the bit also increases. The Counter-Rotating Tandem Motor Drilling System (CRTMDS) was planned to achieve high rate of penetration (ROP) resulting in the reduction of the drilling cost. The system includes two counter-rotating cutter systems to reduce or eliminate the reactive torque the drillpipe or coiled tubing must resist. This would allow the application of maximum weight-on-bit and rotational velocities that a coiled tubing drilling unit is capable of delivering. Several variations of the CRTDMS were designed, manufactured and tested. The original tests failed leading to design modifications. Two versions of the modified system were tested and showed that the concept is both positive and practical; however, the tests showed that for the system to be robust and durable, borehole diameter should be substantially larger than that of slim holes. As a result, the research team decided to complete the project, document the tested designs and seek further support for the concept outside of the DOE.« less
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 17 Commodity and Securities Exchanges 2 2011-04-01 2011-04-01 false (Item 1205) Drilling and other... Registrants Engaged in Oil and Gas Producing Activities § 229.1205 (Item 1205) Drilling and other exploratory..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net...
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Registrants Engaged in Oil and Gas Producing Activities § 229.1205 (Item 1205) Drilling and other exploratory... 17 Commodity and Securities Exchanges 3 2014-04-01 2014-04-01 false (Item 1205) Drilling and other..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net...
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Registrants Engaged in Oil and Gas Producing Activities § 229.1205 (Item 1205) Drilling and other exploratory... 17 Commodity and Securities Exchanges 2 2013-04-01 2013-04-01 false (Item 1205) Drilling and other..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net...
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Registrants Engaged in Oil and Gas Producing Activities § 229.1205 (Item 1205) Drilling and other exploratory... 17 Commodity and Securities Exchanges 2 2012-04-01 2012-04-01 false (Item 1205) Drilling and other..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, Bruce A.; Bjornstad, Bruce N.; Lanigan, David C.
2006-03-29
This report supplies the information obtained during drilling, characterization, and installation of the new groundwater monitoring well. This document also provides a compilation of hydrogeologic and well construction information obtained during drilling, well development, and sample collection/analysis activities.
Rock melting technology and geothermal drilling
NASA Technical Reports Server (NTRS)
Rowley, J. C.
1974-01-01
National awareness of the potential future shortages in energy resources has heightened interest in exploration and utilization of a variety of geothermal energy (GTE) reservoirs. The status of conventional drilling of GTE wells is reviewed briefly and problem areas which lead to higher drilling costs are identified and R and D directions toward solution are suggested. In the immediate future, an expanded program of drilling in GTE formations can benefit from improvements in drilling equipment and technology normally associated with oil or gas wells. Over a longer time period, the new rock-melting drill bits being developed as a part of the Los Alamos Scientific Laboratory's Subterrene Program offer new solutions to a number of problems which frequently hamper GTE drilling, including the most basic problem - high temperature. Two of the most favorable characteristics of rock-melting penetrators are their ability to operate effectively in hot rock and produce glass linings around the hole as an integral part of the drilling process. The technical advantages to be gained by use of rock-melting penetrators are discussed in relation to the basic needs for GTE wells.
Williams, John H.; Bird, Philip H.; Conger, Randall W.; Anderson, J. Alton
2014-01-01
Collection and integrated analysis of drilling and geophysical logs provided an efficient and effective means for characterizing the geohydrologic framework and conditions penetrated by the tophole at the selected oil-and-gas well site. The logging methods and lessons learned at this well site could be applied at other oil-and-gas drilling sites to better characterize the shallow subsurface with the overall goal of protecting freshwater aquifers during hydrocarbon development.
Drilling Automation Tests At A Lunar/Mars Analog Site
NASA Technical Reports Server (NTRS)
Glass, B.; Cannon, H.; Hanagud, S.; Lee, P.; Paulsen, G.
2006-01-01
Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. The limited mass, energy and manpower in planetary drilling situations makes application of terrestrial drilling techniques problematic. The Drilling Automation for Mars Exploration (DAME) project is developing drilling automation and robotics for projected use in missions to the Moon and Mars in the 2011-15 period. This has been tested recently, drilling in permafrost at a lunar/martian analog site (Haughton Crater, Devon Island, Canada).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2004-10-01
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high (greater than 10,000 rpm) rotational speeds. The work includes a feasibility of concept research effort aimed at development and test results that will ultimately result in the ability to reliably drill ''faster and deeper'' possibly with rigs having a smaller footprint to be more mobile. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration rockmore » cutting with substantially lower inputs of energy and loads. The project draws on TerraTek results submitted to NASA's ''Drilling on Mars'' program. The objective of that program was to demonstrate miniaturization of a robust and mobile drilling system that expends small amounts of energy. TerraTek successfully tested ultrahigh speed ({approx}40,000 rpm) small kerf diamond coring. Adaptation to the oilfield will require innovative bit designs for full hole drilling or continuous coring and the eventual development of downhole ultra-high speed drives. For domestic operations involving hard rock and deep oil and gas plays, improvements in penetration rates is an opportunity to reduce well costs and make viable certain field developments. An estimate of North American hard rock drilling costs is in excess of $1,200 MM. Thus potential savings of $200 MM to $600 MM are possible if drilling rates are doubled [assuming bit life is reasonable]. The net result for operators is improved profit margin as well as an improved position on reserves. The significance of the ''ultra-high rotary speed drilling system'' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm--usually well below 5,000 rpm. This document details the progress to date on the program entitled ''SMALLER FOOTPRINT DRILLING SYSTEM FOR DEEP AND HARD ROCK ENVIRONMENTS; FEASIBILITY OF ULTRA-HIGH SPEED DIAMOND DRILLING'' for the period starting June 23, 2003 through September 30, 2004. TerraTek has reviewed applicable literature and documentation and has convened a project kick-off meeting with Industry Advisors in attendance. TerraTek has designed and planned Phase I bench scale experiments. Some difficulties in obtaining ultra-high speed motors for this feasibility work were encountered though they were sourced mid 2004. TerraTek is progressing through Task 3 ''Small-scale cutting performance tests''. Some improvements over early NASA experiments have been identified.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2004-10-01
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high (greater than 10,000 rpm) rotational speeds. The work includes a feasibility of concept research effort aimed at development and test results that will ultimately result in the ability to reliably drill ''faster and deeper'' possibly with rigs having a smaller footprint to be more mobile. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration rockmore » cutting with substantially lower inputs of energy and loads. The project draws on TerraTek results submitted to NASA's ''Drilling on Mars'' program. The objective of that program was to demonstrate miniaturization of a robust and mobile drilling system that expends small amounts of energy. TerraTek successfully tested ultrahigh speed ({approx}40,000 rpm) small kerf diamond coring. Adaptation to the oilfield will require innovative bit designs for full hole drilling or continuous coring and the eventual development of downhole ultra-high speed drives. For domestic operations involving hard rock and deep oil and gas plays, improvements in penetration rates is an opportunity to reduce well costs and make viable certain field developments. An estimate of North American hard rock drilling costs is in excess of $1,200 MM. Thus potential savings of $200 MM to $600 MM are possible if drilling rates are doubled [assuming bit life is reasonable]. The net result for operators is improved profit margin as well as an improved position on reserves. The significance of the ''ultra-high rotary speed drilling system'' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm--usually well below 5,000 rpm. This document details the progress to date on the program entitled ''SMALLER FOOTPRINT DRILLING SYSTEM FOR DEEP AND HARD ROCK ENVIRONMENTS; FEASIBILITY OF ULTRA-HIGH SPEED DIAMOND DRILLING'' for the period starting June 23, 2003 through September 30, 2004. (1) TerraTek has reviewed applicable literature and documentation and has convened a project kick-off meeting with Industry Advisors in attendance. (2) TerraTek has designed and planned Phase I bench scale experiments. Some difficulties in obtaining ultra-high speed motors for this feasibility work were encountered though they were sourced mid 2004. (3) TerraTek is progressing through Task 3 ''Small-scale cutting performance tests''. Some improvements over early NASA experiments have been identified.« less
Geothermal Exploration and Resource Assessment | Geothermal Technologies |
, drilling, and resource assessments and the widespread adoption of under-utilized low-temperature resources -temperature geothermal resource technologies. Drilling The drilling of wells to find and develop geothermal low-temperature, sedimentary, co-produced, and enhanced geothermal system resources. We also work to
Stamm, Robert G.
2018-06-08
BackgroundIn the fall of 2011, the U.S. Geological Survey (USGS) was afforded an opportunity to participate in an environmental monitoring study of the potential impacts of a deep, unconventional Marcellus Shale hydraulic fracturing site. The drill site of the prospective case study is the “Range Resources MCC Partners L.P. Units 1-5H” location (also referred to as the “RR–MCC” drill site), located in Washington County, southwestern Pennsylvania. Specifically, the USGS was approached to provide a geologic framework that would (1) provide geologic parameters for the proposed area of a localized groundwater circulation model, and (2) provide potential information for the siting of both shallow and deep groundwater monitoring wells located near the drill pad and the deviated drill legs.The lead organization of the prospective case study of the RR–MCC drill site was the Groundwater and Ecosystems Restoration Division (GWERD) of the U.S. Environmental Protection Agency. Aside from the USGS, additional partners/participants were to include the Department of Energy, the Pennsylvania Geological Survey, the Pennsylvania Department of Environmental Protection, and the developer Range Resources LLC. During the initial cooperative phase, GWERD, with input from the participating agencies, drafted a Quality Assurance Project Plan (QAPP) that proposed much of the objectives, tasks, sampling and analytical procedures, and documentation of results.Later in 2012, the proposed cooperative agreement between the aforementioned partners and the associated land owners for a monitoring program at the drill site was not executed. Therefore, the prospective case study of the RR–MCC site was terminated and no installation of groundwater monitoring wells nor the collection of nearby soil, stream sediment, and surface-water samples were made.Prior to the completion of the QAPP and termination of the perspective case study the geologic framework was rapidly conducted and nearly completed. This was done for three principal reasons. First, there was an immediate need to know the distribution of the relatively undisturbed surface to near-surface bedrock geology and unconsolidated materials for the collection of baseline surface data prior to drill site development (drill pad access road, drill pad leveling) and later during monitoring associated with well drilling, well development, and well production. Second, it was necessary to know the bedrock geology to support the siting of: (1) multiple shallow groundwater monitoring wells (possibly as many as four) surrounding and located immediately adjacent to the drill pad, and (2) deep groundwater monitoring wells (possibly two) located at distance from the drill pad with one possibly being sited along one of the deviated production drill legs. Lastly, the framework geology would provide the lateral extent, thickness, lithology, and expected discontinuities of geologic units (to be parsed or grouped as hydrostratigraphic units) and regional structure trends as inputs into the groundwater model.This report provides the methodology of geologic data accumulation and aggregation, and its integration into a geographic information system (GIS) based program. The GIS program will allow multiple data to be exported in various formats (shapefiles [.shp], database files [.dbf], and Keyhole Markup Language files [.KML]) for use in surface and subsurface geologic site characterization, for sampling strategies, and for inputs for groundwater modeling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
William C. Maurer; William J. McDonald; Thomas E. Williams
Underbalanced drilling is experiencing growth at a rate that rivals that of horizontal drilling in the mid-1980s and coiled-tubing drilling in the 1990s. Problems remain, however, for applying underbalanced drilling in a wider range of geological settings and drilling environments. This report addresses developments under this DOE project to develop products aimed at overcoming these problems. During Phase I of the DOE project, market analyses showed that up to 12,000 wells per year (i.e., 30% of all wells) will be drilled underbalanced in the U.S.A. within the next ten years. A user-friendly foam fluid hydraulics model (FOAM) was developed formore » a PC Windows environment during Phase I. FOAM predicts circulating pressures and flow characteristics of foam fluids used in underbalanced drilling operations. FOAM is based on the best available mathematical models, and was validated through comparison to existing models, laboratory test data and field data. This model does not handle two-phase flow or air and mist drilling where the foam quality is above 0.97. This FOAM model was greatly expanded during Phase II including adding an improved foam rheological model and a ''matching'' feature that allows the model to be field calibrated. During Phase I, a lightweight drilling fluid was developed that uses hollow glass spheres (HGS) to reduce the density of the mud to less than that of water. HGS fluids have several advantages over aerated fluids, including they are incompressible, they reduce corrosion and vibration problems, they allow the use of mud-pulse MWD tools, and they eliminate high compressor and nitrogen costs. Phase II tests showed that HGS significantly reduce formation damage with water-based drilling and completion fluids and thereby potentially can increase oil and gas production in wells drilled with water-based fluids. Extensive rheological testing was conducted with HGS drilling and completion fluids during Phase II. These tests showed that the HGS fluids act similarly to conventional fluids and that they have potential application in many areas, including underbalanced drilling, completions, and riserless drilling. Early field tests under this project are encouraging. These led to limited tests by industry (which are also described). Further field tests and cost analyses are needed to demonstrate the viability of HGS fluids in different applications. Once their effectiveness is demonstrated, they should find widespread application and should significantly reduce drilling costs and increase oil and gas production rates. A number of important oilfield applications for HGS outside of Underbalanced Drilling were identified. One of these--Dual Gradient Drilling (DGD) for deepwater exploration and development--is very promising. Investigative work on DGD under the project is reported, along with definition of a large joint-industry project resulting from the work. Other innovative products/applications are highlighted in the report including the use of HGS as a cement additive.« less
Drilling report: State Nursery test well No. 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Donovan, J.; Sonderegger, J.
1982-08-27
A geothermal test well was sited and drilled approximately 0.8 miles (1.3 km) east of Broadwater Hot Springs, near Helena, Montana. The site is on the property of the State Nursery, along the north side of Ten Mile Creek. The purpose of the drilling was to test a thermal infrared imagery anomaly and to evaluate whether a source of warm water for space heating of a series of new greenhouses could be developed to replace ones destroyed in the spring 1981 flooding of Ten Mile Creek. The well was drilled to 280 feet total depth, with no success in obtainingmore » hot or even warm water.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chevallier, J.J.; Quetier, F.P.; Marshall, D.W.
Sedco Forex has developed an integrated computer system to enhance the technical performance of the company at various operational levels and to increase the understanding and knowledge of the drill crews. This paper describes the system and how it is used for recording and processing drilling data at the rig site, for associated technical analyses, and for well design, planning, and drilling performance studies at the operational centers. Some capabilities related to the statistical analysis of the company's operational records are also described, and future development of rig computing systems for drilling applications and management tasks is discussed.
NASA Astrophysics Data System (ADS)
Ortega Mercado, Camilo Ernesto
Horizontal drilling and hydraulic fracturing techniques have become almost mandatory technologies for economic exploitation of unconventional gas reservoirs. Key to commercial success is minimizing the risk while drilling and hydraulic fracturing these wells. Data collection is expensive and as a result this is one of the first casualties during budget cuts. As a result complete data sets in horizontal wells are nearly always scarce. In order to minimize the data scarcity problem, the research addressed throughout this thesis concentrates on using drill cuttings, an inexpensive direct source of information, for developing: 1) A new methodology for multi-stage hydraulic fracturing optimization of horizontal wells without any significant increases in operational costs. 2) A new method for petrophysical evaluation in those wells with limited amount of log information. The methods are explained using drill cuttings from the Nikanassin Group collected in the Deep Basin of the Western Canada Sedimentary Basin (WCSB). Drill cuttings are the main source of information for the proposed methodology in Item 1, which involves the creation of three 'log tracks' containing the following parameters for improving design of hydraulic fracturing jobs: (a) Brittleness Index, (b) Measured Permeability and (c) An Indicator of Natural Fractures. The brittleness index is primarily a function of Poisson's ratio and Young Modulus, parameters that are obtained from drill cuttings and sonic logs formulations. Permeability is measured on drill cuttings in the laboratory. The indication of natural fractures is obtained from direct observations on drill cuttings under the microscope. Drill cuttings are also the main source of information for the new petrophysical evaluation method mentioned above in Item 2 when well logs are not available. This is important particularly in horizontal wells where the amount of log data is almost non-existent in the vast majority of the wells. By combining data from drill cuttings and previously available empirical relationships developed from cores it is possible to estimate water saturations, pore throat apertures, capillary pressures, flow units, porosity (or cementation) exponent m, true formation resistivity Rt, distance to a water table (if present), and to distinguish the contributions of viscous and diffusion-like flow in the tight gas formation. The method further allows the construction of Pickett plots using porosity and permeability obtained from drill cuttings, without previous availability of well logs. The method assumes the existence of intervals at irreducible water saturation, which is the case of the Nikanassin Group throughout the gas column. The new methods mentioned above are not meant to replace the use of detailed and sophisticated evaluation techniques. But the proposed methods provide a valuable and practical aid in those cases where geomechanical and petrophysical information are scarce.
Application of drilling, coring, and sampling techniques to test holes and wells
Shuter, Eugene; Teasdale, Warren E.
1989-01-01
The purpose of this manual is to provide ground-water hydrologists with a working knowledge of the techniques of test drilling, auger drilling, coring and sampling, and the related drilling and sampling equipment. For the most part, the techniques discussed deal with drilling, sampling, and completion of test holes in unconsolidated sediments because a hydrologist is interested primarily in shallow-aquifer data in this type of lithology. Successful drilling and coring of these materials usually is difficult, and published research information on the subject is not readily available. The authors emphasize in-situ sampling of unconsolidated sediments to obtain virtually undisturbed samples. Particular attention is given to auger drilling and hydraulic-rotary methods of drilling because these are the principal means of test drilling performed by the U.S. Geological Survey during hydrologic studies. Techniques for sampling areas contaminated by solid or liquid waste are discussed. Basic concepts of well development and a detailed discussion of drilling muds, as related to hole conditioning, also are included in the report. The information contained in this manual is intended to help ground-water hydrologists obtain useful subsurface data and samples from their drilling programs.
Manda, Alex K; Heath, Jamie L; Klein, Wendy A; Griffin, Michael T; Montz, Burrell E
2014-09-01
A majority of well pads for unconventional gas wells that are drilled into the Marcellus shale (northeastern USA) consist of multiple wells (in some cases as many as 12 wells per pad), yet the influence of the evolution of well pad development on the extent of environmental violations and wastewater production is unknown. Although the development of multi-well pads (MWP) at the expense of single well pads (SWP) has been mostly driven by economic factors, the concentrated nature of drilling activities from hydraulic fracturing and horizontal drilling operations on MWP suggests that MWP may create less surface disturbance, produce more volumes of wastewater, and generate more environmental violations than SWP. To explore these hypotheses, we use geospatial techniques and statistical analyses (i.e., regression and Mann-Whitney tests) to assess development of unconventional shale gas wells, and quantify environmental violations and wastewater volumes on SWP and MWP in Pennsylvania. The analyses include assessments of the influence of different types of well pads on potential, minor and major environmental events. Results reveal that (a) in recent years, a majority of pads on which new wells for unconventional gas were drilled are MWP, (b) on average, MWP have about five wells located on each pad and thus, had the transition to MWP not occurred, between two and four times as much land surface disturbance would have occurred per year if drilling was relegated to SWP, (c) there were more environmental violations on MWP than SWP, but when the number of wells were taken into account, fewer environmental violations per well were observed on MWP than on SWP, (d) there were more wastewater and recycled wastewater volumes per pad and per well produced on MWP than on SWP, and (e) the proportion of wastewater that was recycled was higher on MWP than SWP. This study sheds light on how the evolution from SWP to MWP has influenced environmental violations and wastewater production in a field that has undergone rapid development in recent years. Copyright © 2014 Elsevier Ltd. All rights reserved.
Su, Jiann
2016-05-23
Drilling results from the microhole project at the Sandia High Operating Temperature test facility. The project is seeking to help reduce the cost of exploration and monitoring of geothermal wells and formations by drilling smaller holes. The tests were part of a control algorithm development to optimize the weight-on-bit (WOB) used during drilling with a percussive hammer.
A method of the up or down layer development of class II oil reservoirs
NASA Astrophysics Data System (ADS)
Wang, Fulin; Zhao, Yunfei; Fang, Yanjun; Yang, Tao; Gui, Dongxu; Wang, Gang; Feng, Chengcheng
2018-06-01
During the 13th five-year period, class II reservoirs of DaQing Oilfield first layer series development will be fully completed, secondary up or down layer development is facing new well drilling or the use of old we ll pattern network method chosen, need to determine development mode of oil block. In this paper, the system economy model is established, the up and down oil layer of the block is considered as one system, and through the comparison of the two models that new well drilling or the use of old well pattern, we can determine the development mode of the block. And take b1ddd block as an example, determine the block need to use what method to develop in different oil prices. Result show when the oil price is 40/bbl, using exiting well to production, when oil price is 70/bbl., using new drilling development model. The method to fill the theory and methodology on selection about reservoir development mode, can provide technical support for DaQing Oilfield the 14th five-year planning and long-term planning.
Pre- and post-drill comparison of the Mount Elbert gas hydrate prospect, Alaska North Slope
Lee, M.W.; Agena, W.F.; Collett, T.S.; Inks, T.L.
2011-01-01
In 2006, the United States Geological Survey (USGS) completed a detailed analysis and interpretation of available 2-D and 3-D seismic data, along with seismic modeling and correlation with specially processed downhole well log data for identifying potential gas hydrate accumulations on the North Slope of Alaska. A methodology was developed for identifying sub-permafrost gas hydrate prospects within the gas hydrate stability zone in the Milne Point area. The study revealed a total of 14 gas hydrate prospects in this area.In order to validate the gas hydrate prospecting protocol of the USGS and to acquire critical reservoir data needed to develop a longer-term production testing program, a stratigraphic test well was drilled at the Mount Elbert prospect in the Milne Point area in early 2007. The drilling confirmed the presence of two prominent gas-hydrate-bearing units in the Mount Elbert prospect, and high quality well logs and core data were acquired. The post-drill results indicate pre-drill predictions of the reservoir thickness and the gas-hydrate saturations based on seismic and existing well data were 90% accurate for the upper unit (hydrate unit D) and 70% accurate for the lower unit (hydrate unit C), confirming the validity of the USGS approach to gas hydrate prospecting. The Mount Elbert prospect is the first gas hydrate accumulation on the North Slope of Alaska identified primarily on the basis of seismic attribute analysis and specially processed downhole log data. Post-drill well log data enabled a better constraint of the elastic model and the development of an improved approach to the gas hydrate prospecting using seismic attributes. ?? 2009.
Test-well drilling in the upper Satus Creek basin, Yakima Indian Reservation, Washington
Pearson, H.E.
1977-01-01
Two test wells were drilled in the upper Satus Creek basin of the Yakima Indian Reservation, Washington, using the air-rotary method. At site 1 the well penetrated a young basalt and 175 feet of the Yakima Basalt, and at site 2 the well penetrated the young basalt. The well at site 1 was drilled to a depth of 350 feet. Tests for drawdown and yield indicated a specific capacity of about 11 gallons per minute per foot of drawdown. The potential yield of this well may be about 1,000 gallons per minute. The well at site 2 was drilled to a depth of 500 feet. Only a small quantity of water was encountered and no test for yield was made. Data from these wells, including chemical analysis of the water from the well at site 1, will provide information useful in the development and management of the ground-water resources in this part of the Yakima Indian Reservation. (Woodard-USGS)
USE OF DRILLING FLUIDS IN MONITORING WELL NETWORK INSTALLATION: LANL AND OPEN DISCUSSION
Personnel at the EPA Ground Water and Ecosystems Restoration Division (GWERD) were requested by EPA Region 6 to provide a technical analysis of the impacts of well drilling practices implemented at the Los Alamos National Laboratory (LANL) as part of the development of their grou...
Bit selection using field drilling data and mathematical investigation
NASA Astrophysics Data System (ADS)
Momeni, M. S.; Ridha, S.; Hosseini, S. J.; Meyghani, B.; Emamian, S. S.
2018-03-01
A drilling process will not be complete without the usage of a drill bit. Therefore, bit selection is considered to be an important task in drilling optimization process. To select a bit is considered as an important issue in planning and designing a well. This is simply because the cost of drilling bit in total cost is quite high. Thus, to perform this task, aback propagation ANN Model is developed. This is done by training the model using several wells and it is done by the usage of drilling bit records from offset wells. In this project, two models are developed by the usage of the ANN. One is to find predicted IADC bit code and one is to find Predicted ROP. Stage 1 was to find the IADC bit code by using all the given filed data. The output is the Targeted IADC bit code. Stage 2 was to find the Predicted ROP values using the gained IADC bit code in Stage 1. Next is Stage 3 where the Predicted ROP value is used back again in the data set to gain Predicted IADC bit code value. The output is the Predicted IADC bit code. Thus, at the end, there are two models that give the Predicted ROP values and Predicted IADC bit code values.
Gallegos, Tanya J.; Varela, Brian A.
2015-01-01
Hydraulic fracturing is presently the primary stimulation technique for oil and gas production in low-permeability, unconventional reservoirs. Comprehensive, published, and publicly available information regarding the extent, location, and character of hydraulic fracturing in the United States is scarce. This national spatial and temporal analysis of data on nearly 1 million hydraulically fractured wells and 1.8 million fracturing treatment records from 1947 through 2010 (aggregated in Data Series 868) is used to identify hydraulic fracturing trends in drilling methods and use of proppants, treatment fluids, additives, and water in the United States. These trends are compared to the literature in an effort to establish a common understanding of the differences in drilling methods, treatment fluids, and chemical additives and of how the newer technology has affected the water use volumes and areal distribution of hydraulic fracturing. Historically, Texas has had the highest number of records of hydraulic fracturing treatments and associated wells in the United States documented in the datasets described herein. Water-intensive horizontal/directional drilling has also increased from 6 percent of new hydraulically fractured wells drilled in the United States in 2000 to 42 percent of new wells drilled in 2010. Increases in horizontal drilling also coincided with the emergence of water-based “slick water” fracturing fluids. As such, the most current hydraulic fracturing materials and methods are notably different from those used in previous decades and have contributed to the development of previously inaccessible unconventional oil and gas production target areas, namely in shale and tight-sand reservoirs. Publicly available derivative datasets and locations developed from these analyses are described.
Aerated drilling cutting transport analysis in geothermal well
NASA Astrophysics Data System (ADS)
Wakhyudin, Aris; Setiawan, Deni; Dwi Marjuan, Oscar
2017-12-01
Aeratad drilling widely used for geothermal drilling especially when drilled into predicted production zone. Aerated drilling give better performance on preventing lost circulation problem, improving rate of penetration, and avoiding drilling fluid invasion to productive zone. While well is drilled, cutting is produced and should be carried to surface by drilling fluid. Hole problem, especially pipe sticking will occur while the cutting is not lifted properly to surface. The problem will effect on drilling schedule; non-productive time finally result more cost to be spent. Geothermal formation has different characteristic comparing oil and gas formation. Geothermal mainly has igneous rock while oil and gas mostly sedimentary rock. In same depth, formation pressure in geothermal well commonly lower than oil and gas well while formation temperature geothermal well is higher. While aerated drilling is applied in geothermal well, Igneous rock density has higher density than sedimentary rock and aerated drilling fluid is lighter than water based mud hence minimum velocity requirement to transport cutting is larger than in oil/gas well drilling. Temperature and pressure also has impact on drilling fluid (aerated) density. High temperature in geothermal well decrease drilling fluid density hence the effect of pressure and temperature also considered. In this paper, Aerated drilling cutting transport performance on geothermal well will be analysed due to different rock and drilling fluid density. Additionally, temperature and pressure effect on drilling fluid density also presented to merge.
Horizontal technology helps spark Louisiana`s Austin chalk trend
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koen, A.D.
1996-04-29
A handful of companies paced by some of the most active operators in the US are pressing the limits of horizontal technology to ramp up Cretaceous Austin chalk exploration and development (E and D) across Louisiana. Companies find applications in Louisiana for lessons learned drilling horizontal wells to produce chalk intervals in Texas in Giddings, Pearsall, and Brookeland fields. Continuing advances in horizontal well technology are helping operators deal with deeper, hotter reservoirs in more complex geological settings that typify the chalk in Louisiana. Better horizontal drilling, completion, formation evaluation, and stimulation techniques have enabled operators to produce oil andmore » gas from formations previously thought to be uneconomical. Most of the improved capabilities stem from better horizontal tools. Horizontal drilling breakthroughs include dual powered mud motors and retrievable whipstocks, key links in the ability to drill wells with more than one horizontal lateral. Better geosteering tools have enabled operators to maintain horizontal wellbores in desired intervals by signaling bit positions downhole while drilling. This paper reviews the technology and provides a historical perspective on the various drilling programs which have been completed in this trend. It also makes predictions on future drilling successes.« less
Reducing temperature elevation of robotic bone drilling.
Feldmann, Arne; Wandel, Jasmin; Zysset, Philippe
2016-12-01
This research work aims at reducing temperature elevation of bone drilling. An extensive experimental study was conducted which focused on the investigation of three main measures to reduce the temperature elevation as used in industry: irrigation, interval drilling and drill bit designs. Different external irrigation rates (0 ml/min, 15 ml/min, 30 ml/min), continuously drilled interval lengths (2 mm, 1 mm, 0.5 mm) as well as two drill bit designs were tested. A custom single flute drill bit was designed with a higher rake angle and smaller chisel edge to generate less heat compared to a standard surgical drill bit. A new experimental setup was developed to measure drilling forces and torques as well as the 2D temperature field at any depth using a high resolution thermal camera. The results show that external irrigation is a main factor to reduce temperature elevation due not primarily to its effect on cooling but rather due to the prevention of drill bit clogging. During drilling, the build up of bone material in the drill bit flutes result in excessive temperatures due to an increase in thrust forces and torques. Drilling in intervals allows the removal of bone chips and cleaning of flutes when the drill bit is extracted as well as cooling of the bone in-between intervals which limits the accumulation of heat. However, reducing the length of the drilled interval was found only to be beneficial for temperature reduction using the newly designed drill bit due to the improved cutting geometry. To evaluate possible tissue damage caused by the generated heat increase, cumulative equivalent minutes (CEM43) were calculated and it was found that the combination of small interval length (0.5 mm), high irrigation rate (30 ml/min) and the newly designed drill bit was the only parameter combination which allowed drilling below the time-thermal threshold for tissue damage. In conclusion, an optimized drilling method has been found which might also enable drilling in more delicate procedures such as that performed during minimally invasive robotic cochlear implantation. Copyright © 2016 IPEM. Published by Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wray, Laura L.; Eby, David E.; Chidsey, Jr., Thomas C.
2002-07-24
This report covers research activities for the second half of the second project year (October 6, 2001, through April 5, 2002). This work includes description and analysis of cores, correlation of geophysical well logs, reservoir mapping, petrographic description of thin sections, cross plotting of permeability and porosity data, and development of horizontal drilling strategies for the Little Ute and Sleeping Ute fields in Montezuma County, Colorado. Geological characterization on a local scale focused on reservoir heterogeneity, quality, and lateral continuity, as well as possible compartmentalization, within these fields. This study utilizes representative core, geophysical logs, and thin sections to characterizemore » and grade each field's potential for drilling horizontal laterals from existing development wells.« less
Code of Federal Regulations, 2011 CFR
2011-07-01
... RELIEF OR REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General Royalty Relief for Drilling Deep... take to obtain and use the royalty suspension supplement? (a) Before you start drilling a well on your... Supervisor for Production and Development of your intent to begin drilling operations and the depth of the...
Exploration of Ulumbu Geothermal field, Flores-East Nusa Tenggara Indonesia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sulasdi, D.
1996-12-31
This paper describes the progress made in developing geothermal resources at Ulurnbu Flores, Indonesia for utilization mini geothermal power generation. Two deep exploratory wells drilling drilled by PLN confirmed the existence of the resources. The well measurement carried out during drilling and after completion of the well indicated that the major permeable zone at around 680 m depth and that this zone is a steam cap zone, which is likely to produce high enthalpy steam. The above information indicates that well ULB-01 will produce a mass flow at least 40 tonnes per hour, which will ensure a 3 MW (E)more » Ulumbu mini geothermal power plant.« less
Exploration of Ulumbu geothermal field, Flores-east nusa tenggara, Indonesia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sulasdi, Didi
1996-01-26
This paper describes the progress made in developing geothermal resources at Ulumbu Flores, Indonesia for utilization mini geothermal power generation. Two deep exploratory wells drilling drilled by PLN confirmed the existence of the resources. The well measurement carried out during drilling and after completion of the well indicated that the major permeable zone at around 680 m depth and that this zone is a steam cap zone, which is likely to produce high enthalpy steam. The above information indicates that well ULB-01 will produce a mass flow at least 40 tonnes per hour, which will ensure a 3 MW (E)more » Ulumbu mini geothermal power plant.« less
Results of the second phase of the drought-disaster test-drilling program near Morristown, N.J.
Vecchioli, John; Nichols, William D.; Nemickas, Bronius
1967-01-01
The continued drought in northeastern New Jersey through the summer of 1966 with its attendant water-supply problems resulted in an extension of the drought-disaster test-drilling program originally requested by the Office of Emergency Planning on August 30, 1965. Authorization to continue test drilling was fiven by the Office of Emergency Planning on September 26, 1966, with the stipulation that all field work be complete by January 31, 1977. Contractural costs were paid by the Office of Emergency Planning, whereas personnel costs were shared by the U.S. Geological Survey and the New Jersey Department of Conservation and Economic Development, Division of Water Policy and Supply.The work undertaken in 1965 by the Geological Survey was "...to preform the necessary drilling and testing of wells to identify the extent and nature of a reserve ground-water source in the vicinity of the Passaic River near the northern New Jersey metropolitan area." Results of this first phase were made available in the fall of 1966 in Water Resources Circular 16 of the New Jersey Department of Conservation and Economic Development. Three of the five areas tested (figure 1)--two in Parsippany-Troy Hills Township (areas 2 and 4) and one in East Hanover Township (area 1), Morris County--proved capable of providing an aggregate sustained yield of 7.5 million gallons daily (mgd) from wells constructed in sand and gravel deposits. Because significant supplies of ground water for emergency use were located in the first phase of the exploratory test-drilling program, it was though desirable to extend the originally planned studies so as to obtain maximum practicable information on emergency supplies.During this second phase of the investigation, drilling was conducted in 16 sites in Chatham, Madison, and Florham Park Boroughs and in Hanover and East Hanover Townships, Morris County. (See figure 2.) The drilling in Hanover and East Hanover Townships, and part of the drilling done in Florham Park was to explore the availability of large undeveloped ground-water supplies. Drilling in Chatham, Madison, and Florham Park Boroughs was done primarily to determine the extent and continuity of buried valley-fill aquifers, so that a full evaluation of the effects of pumpage from other areas on these already heavily pumped areas could be made. In addition, it was anticipated that the drilling could help in defining the feasibility of artificial recharge of the heavily pumped areas and in the determination of the prospective method of recharge and points of emplacement.Arrangements for easements with landowners, preparation of specifications for well drilling and seismic work, and supervision of well drilling and seismic contracts were all performed by the New Jersey District, Water Resources Division of the Geological Survey.Prior to the test drilling, seismic exploration under contract with Alpine Geophysical Associates of Norwood, N. J. was conducted at five locations in the Chatham-Madison-Florham Park area and at one place in Parsippany-Troy Hills Township. The seismic work was done to determine the most favorable location for a test well at several potential test-well sites and to help in the interpretation of subsurface geology between test sites.Contracts for the drilling of the test holes were awarded during November and drilling commences on November 30. Kaye Well drilling, Inc. of Jackson, N. J. was the recipient of a contract for eight of the test holes, and a second contract was awarded to Rinbrand Well Drilling Co., Inc. of Glen Rock, N. J.--also for eight test holes.Acknowledgment is due to the many public officials of Chatham, Madison, Florham Park, Morristown, and East Hanover Township as well as officials of the Braidburn Corporation and Esso Research and Engineering Co., who cooperated by making their lands available for exploration.
Tyner, David R; Johnson, Matthew R
2014-12-16
A comprehensive technical analysis of available industry-reported well activity and production data for Alberta in 2011 has been used to derive flaring, venting, and diesel combustion greenhouse gas and criteria air contaminant emission factors specifically linked to drilling, completion, and operation of hydraulically fractured natural gas wells. Analysis revealed that in-line ("green") completions were used at approximately 53% of wells completed in 2011, and in other cases the majority (99.5%) of flowback gases were flared rather than vented. Comparisons with limited analogous data available in the literature revealed that reported total flared and vented natural gas volumes attributable to tight gas well-completions were ∼ 6 times larger than Canadian Association of Petroleum Producers (CAPP) estimates for natural gas well-completion based on wells ca. 2000, but 62% less than an equivalent emission factor that can be derived from U.S. EPA data. Newly derived emission factors for diesel combustion during well drilling and completion are thought to be among the first such data available in the open literature, where drilling-related emissions for tight gas wells drilled in Alberta in 2011 were found to have increased by a factor of 2.8 relative to a typical well drilled in Canada in 2000 due to increased drilling lengths. From well-by-well analysis of production phase flared, vented, and fuel usage natural gas volumes reported at 3846 operating tight gas wells in 2011, operational emission factors were developed. Overall results highlight the importance of operational phase GHG emissions at upstream well sites (including on-site natural gas fuel use), and the critical levels of uncertainty in current estimates of liquid unloading emissions.
Preliminary Research on Possibilities of Drilling Process Robotization
NASA Astrophysics Data System (ADS)
Pawel, Stefaniak; Jacek, Wodecki; Jakubiak, Janusz; Zimroz, Radoslaw
2017-12-01
Nowadays, drilling & blasting is crucial technique for deposit excavation using in hard rock mining. Unfortunately, such approach requires qualified staff to perform, and consequently there is a serious risk related to rock mechanics when using explosives. Negative influence of explosives usage on safety issues of underground mine is a main cause of mining demands related to elimination of people from production area. Other aspects worth taking into consideration are drilling precision according to drilling pattern, blasting effectiveness, improvement of drilling tool reliability etc. In the literature different drilling support solutions are well-known in terms of positioning support systems, anti-jamming systems or cavity detection systems. For many years, teleoperation of drilling process is also developed. Unfortunately, available technologies have so far not fully met the industries expectation in hard rock. Mine of the future is expected to incorporate robotic system instead of current approaches. In this paper we present preliminary research related to robotization of drilling process and possibilities of its application in underground mine condition. A test rig has been proposed. To simulate drilling process several key assumptions have been accepted. As a result, algorithms for automation of drilling process have been proposed and tested on the test rig. Experiences gathered so far underline that there is a need for further developing robotic system for drilling process.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maricic, N.; Mohaghegh, S.D.; Artun, E.
2008-12-15
Recent years have witnessed a renewed interest in development of coalbed methane (CBM) reservoirs. Optimizing CBM production is of interest to many operators. Drilling horizontal and multilateral wells is gaining Popularity in many different coalbed reservoirs, with varying results. This study concentrates on variations of horizontal and multilateral-well configurations and their potential benefits. In this study, horizontal and several multilateral drilling patterns for CBM reservoirs are studied. The reservoir parameters that have been studied include gas content, permeability, and desorption characteristics. Net present value (NPV) has been used as the yard stick for comparing different drilling configurations. Configurations that havemore » been investigated are single-, dual-, tri-, and quad-lateral wells along with fishbone (also known as pinnate) wells. In these configurations, the total length of horizontal wells and the spacing between laterals (SBL) have been studied. It was determined that in the cases that have been studied in this paper (all other circumstances being equal), quadlateral wells are the optimum well configuration.« less
Development and Testing of The Lunar Resource Prospector Drill
NASA Astrophysics Data System (ADS)
Zacny, K.; Paulsen, G.; Kleinhenz, J.; Smith, J. T.; Quinn, J.
2017-12-01
The goal of the Lunar Resource Prospector (RP) mission is to capture and identify volatiles species within the top one meter layer of the lunar surface. The RP drill has been designed to 1. Generate cuttings and place them on the surface for analysis by the Near InfraRed Volatiles Spectrometer Subsystem (NIRVSS), and 2. Capture cuttings and transfer them to the Oxygen and Volatile Extraction Node (OVEN) coupled with the Lunar Advanced Volatiles Analysis (LAVA) subsystem. The RP drill is based on the TRL4 Mars Icebreaker drill and TRL5 LITA drill developed for capturing samples of ice and ice cemented ground on Mars, and represents over a decade of technology development effort. The TRL6 RP drill weighs approximately 15 kg and is rated at just over 500 Watt. The drill consists of: 1. Rotary-Percussive Drill Head, 2. Sampling Auger, 3. Brushing Station, 4. Feed Stage, and 5. Deployment Stage. To reduce sample handling complexity, the drill auger is designed to capture cuttings as opposed to cores. High sampling efficiency is possible through a dual design of the auger. The lower section has deep and low pitch flutes for retaining of cuttings. The upper section has been designed to efficiently move the cuttings out of the hole. The drill uses a "bite" sampling approach where samples are captured in 10 cm depth intervals. The first generation, TRL4 Icebreaker drill was tested in Mars chamber as well as in Antarctica and the Arctic. It demonstrated drilling at 1-1-100-100 level (1 meter in 1 hour with 100 Watt and 100 N Weight on Bit) in ice, ice cemented ground, soil, and rocks. The second generation, TRL5 LITA drill was deployed on a Carnegie Mellon University rover, called Zoe, and tested in Atacama, Antarctica, the Arctic, and Greenland. The tests demonstrated fully autonomous sample acquisition and delivery to a carousel. The modified LITA drill was tested in NASA GRC's lunar vacuum chamber at <10^-5 torr and <200 K. It demonstrated successful capture and transfer of volatile rich frozen samples to a crucible for analysis. The modified LITA drill has also been successfully vibration tested at NASA KSC. The drill was integrated with RP rover at NASA JSC and successfully tested in a lab and in the field, as well as on a large vibration table and steep slope. The latest TRL6 RP drill is currently undergoing testing at NASA GRC lunar chamber facilities.
30 CFR 250.1612 - Well-control drills.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Well-control drills. 250.1612 Section 250.1612 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE... § 250.1612 Well-control drills. Well-control drills shall be conducted for each drilling crew in...
Hydraulics calculation in drilling simulator
NASA Astrophysics Data System (ADS)
Malyugin, Aleksey A.; Kazunin, Dmitry V.
2018-05-01
The modeling of drilling hydraulics in the simulator system is discussed. This model is based on the previously developed quasi-steady model of an incompressible fluid flow. The model simulates the operation of all parts of the hydraulic drilling system. Based on the principles of creating a common hydraulic model, a set of new elements for well hydraulics was developed. It includes elements that correspond to the in-drillstring and annular space. There are elements controlling the inflow from the reservoir into the well and simulating the lift of gas along the annulus. New elements of the hydrosystem take into account the changing geometry of the well, loss in the bit, characteristics of the fluids including viscoplasticity. There is an opportunity specify the complications, the main one of which is gas, oil and water inflow. Correct work of models in cases of complications makes it possible to work out various methods for their elimination. The coefficients of the model are adjusted on the basis of incomplete experimental data provided by operators of drilling platforms. At the end of the article the results of modeling the elimination of gas inflow by a continuous method are presented. The values displayed in the simulator (drill pipe pressure, annulus pressure, input and output flow rates) are in good agreement with the experimental data. This exercise took one hour, which is less than the time on a real rig with the same configuration of equipment and well.
Bima field, Indonesia: a sleeping giant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prior, S.W.
1986-07-01
The recent Pertamina-ARCO Bima field discovery is 50 mi north of Jakarta, Indonesia, on the east flank of the Sunda basin. More than 1 billion bbl of oil are trapped in the Oligocene-Miocene Batu Raja Limestone within a productive area exceeding 25 mi/sup 2/. Additional oil is trapped in Oligocene Talang Akar sandstone reservoirs. The ZZZ-1 wildcat well drilled into the northern featheredge of the field in October 1974. A drill-stem test of the Batu Raja flowed 87 BOPD of heavy oil, and ZZZ-1 was plugged and abandoned as a noncommercial discovery. Postdrilling assessment suggested that the accumulation was stratigraphicallymore » controlled, and no delineation wells were drilled for 9 years. A second test of this trend was finally made in November 1983, to evaluate what was considered a separate Batu Raja closure updip from ZZZ-1. The ZU-1 well found a common oil-water contact with ZZZ-1 that suggested a structurally controlled giant field had been discovered. A series of step-out wells based on a seismic reinterpretation proved this hypothesis to be true. Phase one development drilling began in November 1985, and 57 wells should be completed within the next year. About 60 million bbl of reserves will be developed at an initial rate of about 50,000 BOPD. Phase two plans now in progress could develop an additional 40 million bbl of reserves.« less
Mechanical Properties of Gas Shale During Drilling Operations
NASA Astrophysics Data System (ADS)
Yan, Chuanliang; Deng, Jingen; Cheng, Yuanfang; Li, Menglai; Feng, Yongcun; Li, Xiaorong
2017-07-01
The mechanical properties of gas shale significantly affect the designs of drilling, completion, and hydraulic fracturing treatments. In this paper, the microstructure characteristics of gas shale from southern China containing up to 45.1% clay were analyzed using a scanning electron microscope. The gas shale samples feature strongly anisotropic characteristics and well-developed bedding planes. Their strength is controlled by the strength of both the matrix and the bedding planes. Conventional triaxial tests and direct shear tests are further used to study the chemical effects of drilling fluids on the strength of shale matrix and bedding planes, respectively. The results show that the drilling fluid has a much larger impact on the strength of the bedding plane than that of the shale matrix. The impact of water-based mud (WBM) is much larger compared with oil-based mud. Furthermore, the borehole collapse pressure of shale gas wells considering the effects of drilling fluids are analyzed. The results show that the collapse pressure increases gradually with the increase of drilling time, especially for WBM.
Implementation of improved underbalanced drilling in AbuDhabi onshore field
NASA Astrophysics Data System (ADS)
Alhammadi, Adel Mohammed
Abu Dhabi Company for Onshore Oil Operations (ADCO) is considering Underbalanced Drilling (UBD) as a means to develop lower permeability units in its fields. In addition to productivity and recovery gains, ADCO also expects reservoir characterization benefits from UBD. Reservoir screening studies were carried out on all of ADCO's reservoirs to determine their applicability for UBD. The primary business benefits of UBD were determined to be reservoir characterization, damage Mitigation, and rate of Penetration "ROP" Improvement. Apart from the primary benefits, some of the secondary benefits of UBD that were identified beforehand included rig performance. Since it's a trial wells, the challenge was to drill these wells safely, efficiently and of course meeting well objectives. Many operators worldwide drill these well in underbalanced mode but complete it overbalanced. In our case the plan was to drill and complete these wells in underbalanced condition. But we had to challenge most operators and come up with special and unique casing hanger design to ensure well control barriers exists while fishing the control line of the Downhole Deployment Valve "DDV". After intensive studies and planning, the hanger was designed as per our recommendations and found to be effective equipment that optimized the operational time and the cost as well. This report will provide better understanding of UBD technique in general and shade on the special designed casing hanger compared to conventional or what's most used worldwide. Even thought there were some issues while running the casing hanger prior drilling but managed to capture the learning's from each well and re-modified the hanger and come up with better deign for the future wells. Finally, the new design perform a good performance of saving the operation time and assisting the project to be done in a safe and an easy way without a major impact on the well cost. This design helped to drill and complete these wells safely with requirement to kill the wells and this ensured least reservoir damage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2010-01-15
Broad Funding Opportunity Announcement Project: Foro Energy is developing a unique capability and hardware system to transmit high power lasers over long distances via fiber optic cables. This laser power is integrated with a mechanical drilling bit to enable rapid and sustained penetration of hard rock formations too costly to drill with mechanical drilling bits alone. The laser energy that is directed at the rock basically softens the rock, allowing the mechanical bit to more easily remove it. Foro Energy’s laser-assisted drill bits have the potential to be up to 10 times more economical than conventional hard-rock drilling technologies, makingmore » them an effective way to access the U.S. energy resources currently locked under hard rock formations.« less
25 CFR 213.33 - Diligence and prevention of waste.
Code of Federal Regulations, 2013 CFR
2013-04-01
... the same and to shut off effectually all water from the oil or gas-bearing strata; not drill any well... prevention of waste of oil or gas developed on the land, or the entrance of water through wells drilled by the lessee to the productive sands or oil or gas-bearing strata to the destruction or injury of the...
Microhole Coiled Tubing Bottom Hole Assemblies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Don Macune
2008-06-30
The original objective of the project, to deliver an integrated 3 1/8-inch diameter Measurement While Drilling (MWD) and Logging While Drilling (LWD) system for drilling small boreholes using coiled tubing drilling, has been achieved. Two prototype systems have been assembled and tested in the lab. One of the systems has been successfully tested downhole in a conventional rotary drilling environment. Development of the 3 1/8-inch system has also lead to development and commercialization of a slightly larger 3.5-inch diameter system. We are presently filling customer orders for the 3.5-inch system while continuing with commercialization of the 3 1/8-inch system. Themore » equipment developed by this project will be offered for sale to multiple service providers around the world, enabling the more rapid expansion of both coiled tubing drilling and conventional small diameter drilling. The project was based on the reuse of existing technology whenever possible in order to minimize development costs, time, and risks. The project was begun initially by Ultima Labs, at the time a small company ({approx}12 employees) which had successfully developed a number of products for larger oil well service companies. In September, 2006, approximately 20 months after inception of the project, Ultima Labs was acquired by Sondex plc, a worldwide manufacturer of downhole instrumentation for cased hole and drilling applications. The acquisition provided access to proven technology for mud pulse telemetry, downhole directional and natural gamma ray measurements, and surface data acquisition and processing, as well as a global sales and support network. The acquisition accelerated commercialization through existing Sondex customers. Customer demand resulted in changes to the product specification to support hotter (150 C) and deeper drilling (20,000 psi pressure) than originally proposed. The Sondex acquisition resulted in some project delays as the resistivity collar was interfaced to a different MWD system and also as the mechanical design was revised for the new pressure requirements. However, the Sondex acquisition has resulted in a more robust system, secure funding for completion of the project, and more rapid commercialization.« less
Environment-friendly drilling operation technology
NASA Astrophysics Data System (ADS)
Luo, Huaidong; Jing, Ning; Zhang, Yanna; Huang, Hongjun; Wei, Jun
2017-01-01
Under the circumstance that international safety and environmental standards being more and more stringent, drilling engineering is facing unprecedented challenges, the extensive traditional process flow is no longer accepted, the new safe and environment-friendly process is more suitable to the healthy development of the industry. In 2015, CNPCIC adopted environment-friendly drilling technology for the first time in the Chad region, ensured the safety of well control, at the same time increased the environmental protection measure, reduced the risk of environmental pollution what obtain the ratification from local government. This technology carries out recovery and disposal of crude oil, cuttings and mud without falling on the ground. The final products are used in road and well site construction, which realizes the reutilization of drilling waste, reduces the operating cost, and provides a strong technical support for cost-cutting and performance-increase of drilling engineering under low oil price.
Jeong, Seong-Yup; Kim, Jong-Kil; Lee, Kwang-Bok
2016-12-01
Retrograde drilling is a well accepted procedure for osteochondral lesion of the talus and subchondral cyst with intact overlying cartilage. It has good results in most reports. Compared to anterograde drilling, retrograde drilling can protect the integrity of the articular cartilage. The purpose of this study was to evaluate the suitability of using retrograde drilling for osteochondral lesion with subchondral cyst and discuss the mechanism involved in the development of subchondral cyst. We report a 53-year-old man who had complained left ankle pain that lasted over 6 months which was exacerbated by walking. We diagnosed it as osteochondral lesion of the talus with subchondral cyst. Plain X-ray, computed tomography, and magnetic resonance imaging (MRI) of the ankle. He undertook retrograde drilling without debridement of cartilage. After the surgery, the pain had been subsided for 1 year, although arthritic change had progressed. However, after 5 years of retrograde drilling, he revisited our hospital due to severe ankle pain. Plain X-ray and MRI showed arthritic change of the ankle and multiple cystic formation of talus. Retrograde drilling has some problem because this procedure is not theoretically correct when the development of a subchondral cyst in osteochondral lesion of the talus is considered. In addition, retrograde drilling may impair uninjured bone marrow of the talus, resulting in the development of multiple cystic formations.
Optimizing Geothermal Drilling: Oil and Gas Technology Transfer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tilley, Mitch; Eustes, Alfred; Visser, Charles
There is a significant amount of financial risk associated with geothermal drilling; however, there are opportunities to improve upon current practices and technologies used. The scope of this drilling operational study included 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'perfect well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.), poor data collection, and difficult to ascertain handwriting. An online software database was used to format drilling data to IADC codedmore » daily drilling reports and generate analysis figures. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averages 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million would be lost due to non-productive time in the 21 geothermal wells and only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry. It is the use of Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. However, a work-flow must also be established in order for there to be an efficient drilling program. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.« less
Sediment studies associated with drilling activity on a tropical shallow shelf.
Souza, Claudete R; Vital, Helenice; Melo, Germano; Souza, Cleuneide R; da Silva Nogueira, Mary Lucia; Tabosa, Werner Farkatt
2015-02-01
Environmental monitoring studies were developed in an area located on the outer shelf in the Potiguar Basin, Brazilian equatorial margin. This tropical shelf represents a modern, highly dynamic mixed carbonate-siliciclastic system. Field sampling was carried out during 3 cruises surrounding a shallow-water exploratory well to compare sediment properties of the seafloor, including grain size, texture, mineral composition, carbonate content, and organic matter, prior to drilling with samples obtained 3 and 12 months after drilling. The sample grid used had 16 stations located along 4 radials from 50 m the well up to a distance of 500 m. Sediments were analyzed in the first 0-2 cm and 0-10 cm layers. The results show that sedimentary cover around the well is dominated by bioclastic sediments, poor to very poorly sorted. Only minor sedimentological variations occurred in the area affected by drilling operations. The most noticeable effects were observed during the second cruise, in terms of a change in grain size distribution associated to a slight increase in siliciclastic content. This impact occurred in the most surficial sediment (0-2 cm), in the radials closest to the well (50 m), and could suggest the effects of drilling. However, in the third cruise, 1 year after drilling, the sediments return to show the same characteristics as in the first cruise. These results show no significant sedimentological variations due to drilling activity and indicate that ocean dynamics in this area was high enough to recover the environment original characteristics.
30 CFR 250.1612 - Well-control drills.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Well-control drills. 250.1612 Section 250.1612 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL...-control drills. Well-control drills shall be conducted for each drilling crew in accordance with the...
30 CFR 250.1612 - Well-control drills.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Well-control drills. 250.1612 Section 250.1612 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL...-control drills. Well-control drills shall be conducted for each drilling crew in accordance with the...
30 CFR 250.1612 - Well-control drills.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Well-control drills. 250.1612 Section 250.1612 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL...-control drills. Well-control drills shall be conducted for each drilling crew in accordance with the...
Optimizing Geothermal Drilling: Oil and Gas Technology Transfer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denninger, Kate; Eustes, Alfred; Visser, Charles
There is a significant amount of financial risk associated with geothermal drilling. This study of drilling operations seeks opportunities to improve upon current practices and technologies. The scope of this study included analyzing 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'Perfect Well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.) and poor data collection practices An online software database was used to format drilling data to IADC coded daily drillingmore » reports and generate figures for analysis. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/ equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averaged 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million was spent on non-productive time in the 21 geothermal wells, compared with only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry using Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.« less
Seismic while drilling: Operational experiences in Viet Nam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jackson, M.; Einchcomb, C.
1997-03-01
The BP/Statoil alliance in Viet Nam has used seismic while drilling on four wells during the last two years. Three wells employed the Western Atlas Tomex system, and the last well, Schlumberger`s SWD system. Perceived value of seismic while drilling (SWD) lies in being able to supply real-time data linking drill bit position to a seismic picture of the well. However, once confidence in equipment and methodology is attained, SWD can influence well design and planning associated with drilling wells. More important, SWD can remove uncertainty when actually drilling wells, allowing risk assessment to be carried out more accurately andmore » confidently.« less
Microhole Drilling Tractor Technology Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Western Well Tool
2007-07-09
In an effort to increase the U.S. energy reserves and lower costs for finding and retrieving oil, the USDOE created a solicitation to encourage industry to focus on means to operate in small diameter well-Microhole. Partially in response to this solicitation and because Western Well Tool's (WWT) corporate objective to develop small diameter coiled tubing drilling tractor, WWT responded to and was awarded a contract to design, prototype, shop test, and field demonstrate a Microhole Drilling Tractor (MDT). The benefit to the oil industry and the US consumer from the project is that with the MDT's ability to facilitate Coiledmore » Tubing drilled wells to be 1000-3000 feet longer horizontally, US brown fields can be more efficiently exploited resulting in fewer wells, less environmental impact, greater and faster oil recovery, and lower drilling costs. Shortly after award of the contract, WWT was approached by a major oil company that strongly indicated that the specified size of a tractor of 3.0 inches diameter was inappropriate and that immediate applications for a 3.38-inch diameter tractor would substantially increase the usefulness of the tool to the oil industry. Based on this along with an understanding with the oil company to use the tractor in multiple field applications, WWT applied for and was granted a no-cost change-of-scope contract amendment to design, manufacture, assemble, shop test and field demonstrate a prototype a 3.38 inch diameter MDT. Utilizing existing WWT tractor technology and conforming to an industry developed specification for the tool, the Microhole Drilling Tractor was designed. Specific features of the MDT that increase it usefulness are: (1) Operation on differential pressure of the drilling fluid, (2) On-Off Capability, (3) Patented unique gripping elements (4) High strength and flexibility, (5) Compatibility to existing Coiled Tubing drilling equipment and operations. The ability to power the MDT with drilling fluid results in a highly efficient tool that both delivers high level of force for the pressure available and inherently increases downhole reliability because parts are less subject to contamination. The On-Off feature is essential to drilling to allow the Driller to turn off the tractor and pull back while circulating in cleanout runs that keep the hole clean of drilling debris. The gripping elements have wide contact surfaces to the formation to allow high loads without damage to the formation. As part of the development materials evaluations were conducted to verify compatibility with anticipated drilling and well bore fluids. Experiments demonstrated that the materials of the tractor are essentially undamaged by exposure to typical drilling fluids used for horizontal coiled tubing drilling. The design for the MDT was completed, qualified vendors identified, parts procured, received, inspected, and a prototype was assembled. As part of the assembly process, WWT prepared Manufacturing instructions (MI) that detail the assembly process and identify quality assurance inspection points. Subsequent to assembly, functional tests were performed. Functional tests consisted of placing the MDT on jack stands, connecting a high pressure source to the tractor, and verifying On-Off functions, walking motion, and operation over a range of pressures. Next, the Shop Demonstration Test was performed. An existing WWT test fixture was modified to accommodate operation of the 3.38 inch diameter MDT. The fixture simulated the tension applied to a tractor while walking (pulling) inside 4.0 inch diameter pipe. The MDT demonstrated: (1) On-off function, (2) Pulling forces proportional to available differential pressure up to 4000 lbs, (3) Walking speeds to 1100 ft/hour. A field Demonstration of the MDT was arranged with a major oil company operating in Alaska. A demonstration well with a Measured Depth of approximately 15,000 ft was selected; however because of problems with the well drilling was stopped before the planned MDT usage. Alternatively, functional and operational tests were run with the MDT inside 4.5 inch tubing at depths of 800-950 ft. The MDT successfully demonstrated On-Off capability, pulled with up to 1465 lbs force, and verified its capability to transmit torque though it from the Orienter. Forces generated by the tractor were limited due to insufficient differential pressure because of the unloaded downhole motor, which is not typical during drilling conditions. Additionally, the Coefficient of Friction between the MDT grippers and the tubing was much less than the anticipated COF of the sandstone formation. Despite these minor limitations, to summarize the MDT operated as expected. Minor modifications to the MDT are being incorporated to improve gripping capability of the tractor. Additional demonstration wells are being arranged to expand on the project's goals of delivering a fully operational utilitarian tool for use throughout the US to improve reserves.« less
Nelson, Andrew W; Knight, Andrew W; Eitrheim, Eric S; Schultz, Michael K
2015-04-01
Unconventional drilling (the combination of hydraulic fracturing and horizontal drilling) to extract oil and natural gas is expanding rapidly around the world. The rate of expansion challenges scientists and regulators to assess the risks of the new technologies on drinking water resources. One concern is the potential for subsurface drinking water resource contamination by naturally occurring radioactive materials co-extracted during unconventional drilling activities. Given the rate of expansion, opportunities to test drinking water resources in the pre- and post-fracturing setting are rare. This pilot study investigated the levels of natural uranium, lead-210, and polonium-210 in private drinking wells within 2000 m of a large-volume hydraulic fracturing operation--before and approximately one-year following the fracturing activities. Observed radionuclide concentrations in well waters tested did not exceed maximum contaminant levels recommended by state and federal agencies. No statistically-significant differences in radionuclide concentrations were observed in well-water samples collected before and after the hydraulic fracturing activities. Expanded monitoring of private drinking wells before and after hydraulic fracturing activities is needed to develop understanding of the potential for drinking water resource contamination from unconventional drilling and gas extraction activities. Copyright © 2015 Elsevier Ltd. All rights reserved.
Pulgati, Fernando H; Ayup-Zouain, Ricardo N; Landau, Luiz; Fachel, Jandyra M G
2010-08-01
This paper describes the use of Bayesian spatial models to develop the concept of a spatial-temporal mask for the purpose of identifying regions in which before and after drilling effects are most clearly defined and from which the consequences of exposure of macrofauna and meiofauna to the release of drilling discharges can be evaluated over time. To determine the effects of drilling fluids and drill-cuttings on the marine benthic community, it is essential to know not only where discharged materials ended up within the possible impact area, but also the chemical concentrations to which biota were exposed during and after drilling. Barium and light hydrocarbons were used as chemical tracers for water-based and non-aqueous-based fluids in a shallow water site in the Campos Basin, off the coast of Brazil. Since the site showed evidence of exposure to waste material from earlier drilling, the analysis needed to take into account the background concentrations of these compounds. Using the Bayesian models, concentrations at unsampled sites were predicted and regions altered and previously contaminated were identified.
Auto-Gopher: A Wire-Line Rotary-Hammer Ultrasonic Drill
NASA Technical Reports Server (NTRS)
Badescu, Mircea; Sherrit, Stewart; Bao, Xiaogi; Bar-Cohen, Yoseph; Chen, Beck
2011-01-01
Developing technologies that would enable NASA to sample rock, soil, and ice by coring, drilling or abrading at a significant depth is of great importance for a large number of in-situ exploration missions as well as for earth applications. Proven techniques to sample Mars subsurface will be critical for future NASA astrobiology missions that will search for records of past and present life on the planet, as well as, the search for water and other resources. A deep corer, called Auto-Gopher, is currently being developed as a joint effort of the JPL's NDEAA laboratory and Honeybee Robotics Corp. The Auto-Gopher is a wire-line rotary-hammer drill that combines rock breaking by hammering using an ultrasonic actuator and cuttings removal by rotating a fluted bit. The hammering mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) that has been developed as an adaptable tool for many of drilling and coring applications. The USDC uses an intermediate free-flying mass to transform the high frequency vibrations of the horn tip into a sonic hammering of a drill bit. The USDC concept was used in a previous task to develop an Ultrasonic/Sonic Ice Gopher. The lessons learned from testing the ice gopher were implemented into the design of the Auto-Gopher by inducing a rotary motion onto the fluted coring bit. A wire-line version of such a system would allow penetration of significant depth without a large increase in mass. A laboratory version of the corer was developed in the NDEAA lab to determine the design and drive parameters of the integrated system. The design configuration lab version of the design and fabrication and preliminary testing results are presented in this paper
Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration
NASA Technical Reports Server (NTRS)
Glass, Brian; Cannon, Howard; Stoker, Carol; Davis, Kiel
2005-01-01
Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.
Horizontal wells up odds for profit in Giddings Austin chalk
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maloy, W.T.
1992-02-17
This paper reports on horizontal drilling in the Giddings field Austin chalk which has significantly improved average well recoveries and more than offset increased drilling costs. Although not the panacea originally promoted, horizontal drilling, in Giddings field, offers economic profits to the average investor. Economic analysis indicates that the typical investor is making money by earning returns in excess of market values. Field-wide development will, therefore, remain active unless oil prices or average well recoveries fall below $12/bbl or 112,000 bbl of oil equivalent (BOE), respectively. The application of technological innovation in the Giddings field may culminate in the drillingmore » of over 2,000 horizontal Austin chalk wells, and has conceivably increased recoverable reserves by 400 million BOE.« less
Application of Nuclear Well Logging Techniques to Lunar Resource Assessment
NASA Technical Reports Server (NTRS)
Albats, P.; Groves, J.; Schweitzer, J.; Tombrello, T.
1992-01-01
The use of neutron and gamma ray measurements for the analysis of material composition has become well established in the last 40 years. Schlumberger has pioneered the use of this technology for logging wells drilled to produce oil and gas, and for this purpose has developed neutron generators that allow measurements to be made in deep (5000 m) boreholes under adverse conditions. We also make ruggedized neutron and gamma ray detector packages that can be used to make reliable measurements on the drill collar of a rotating drill string while the well is being drilled, where the conditions are severe. Modern nuclear methods used in logging measure rock formation parameters like bulk density and porosity, fluid composition, and element abundances by weight including hydrogen concentration. The measurements are made with high precision and accuracy. These devices (well logging sondes) share many of the design criteria required for remote sensing in space; they must be small, light, rugged, and able to perform reliably under adverse conditions. We see a role for the adaptation of this technology to lunar or planetary resource assessment missions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Upchurch, J.L.
In order to better meet the challenges associated with downsizing and because of the ongoing need to control costs and accelerate project development many companies are trying new and different strategies in managing projects. For the Seastar Project, Phillips adopted a total team approach. The goal of this approach was to develop a win/win attitude for all of the personnel (Phillips, Engineering Contractor and Equipment Vendors) involved in the project. By bringing all the personnel together and focusing on project success it was thought that costs could be better controlled and that the development schedule could be accelerated. The Seastarmore » Project is a two well subsea development located in Garden Banks Blocks 70 and 71 approximately 120 miles south of Cameron Louisiana. Phillips took over operatorship in 1992 and drilled Garden Banks Block 71 No. 2, which discovered 349 feet of net gas pay in April 1993. Following a successful drill stem test on GB 71 No. 2, drilling was started on an appraisal well and work began on a feasibility study to define development options.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Rawlins Test 2, UCG/SDB Master Well Drilling and Well Completion Plan consists of two separate reports. Part 1 consists of the Process Well Drilling and Completion Plan (Version D). This program was accomplished during the Fall 1980 drilling campaign. Four of the HFEM wells described in Part 2 were also drilled during that campaign due to early completion of the process well drilling. General program objectives are stated in this report. Part 2 consists of the Instrument Well Drilling and Completion Plan (Version B). This program is presently being accomplished in the Spring 1981 drilling campaign. Due to manymore » changes in the types, numbers and locations of the instrument wells it was written in a more general fashion to retain flexibility in the plan. The only significant changes to date from the plan are that the four HFEM wells completed during Fall 1980 were completed with 92' of Fiberglass at the bottom instead of the 210' now specified.« less
Chalk play tops Gulf Coast horizontal scene
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-11-18
This paper reports on horizontal drilling in the Cretaceous Austin chalk of Texas which dominates news of U.S. Gulf Coast horizontal action. In spite of a significant decline in horizontal drilling in Texas-the Texas Railroad Commission reported a 15 unit decline in the number of permits to drill horizontal wells during the third quarter-operators in East and South Texas continue to expand plays and develop new ones. The Cretaceous Bruda may be gaining some respect as a horizontal target in Texas. Elsewhere on the Gulf Coast, Mississippi soon will see more action on the horizontal drilling front.
Jiang, Hua; Luo, Yi; McQuerrey, Joe
2018-02-01
Underground coalmine roof bolting operators exhibit a continued risk for overexposure to airborne levels of respirable coal and crystalline silica dust from the roof drilling operation. Inhaling these dusts can cause coal worker's pneumoconiosis and silicosis. This research explores the effect of drilling control parameters, specifically drilling bite depth, on the reduction of respirable dust generated during the drilling process. Laboratory drilling experiments were conducted and results demonstrated the feasibility of this dust control approach. Both the weight and size distribution of the dust particles collected from drilling tests with different bite depths were analyzed. The results showed that the amount of total inhalable and respirable dust was inversely proportional to the drilling bite depth. Therefore, control of the drilling process to achieve proper high-bite depth for the rock can be an important approach to reducing the generation of harmful dust. Different from conventional passive engineering controls, such as mist drilling and ventilation approaches, this approach is proactive and can cut down the generation of respirable dust from the source. These findings can be used to develop an integrated drilling control algorithm to achieve the best drilling efficiency as well as reducing respirable dust and noise.
Advanced Geothermal Turbodrill
DOE Office of Scientific and Technical Information (OSTI.GOV)
W. C. Maurer
2000-05-01
Approximately 50% of the cost of a new geothermal power plant is in the wells that must be drilled. Compared to the majority of oil and gas wells, geothermal wells are more difficult and costly to drill for several reasons. First, most U.S. geothermal resources consist of hot, hard crystalline rock formations which drill much slower than the relatively soft sedimentary formations associated with most oil and gas production. Second, high downhole temperatures can greatly shorten equipment life or preclude the use of some technologies altogether. Third, producing viable levels of electricity from geothermal fields requires the use of largemore » diameter bores and a high degree of fluid communication, both of which increase drilling and completion costs. Optimizing fluid communication often requires creation of a directional well to intersect the best and largest number of fracture capable of producing hot geothermal fluids. Moineau motor stators made with elastomers cannot operate at geothermal temperatures, so they are limited to the upper portion of the hole. To overcome these limitations, Maurer Engineering Inc. (MEI) has developed a turbodrill that does not use elastomers and therefore can operate at geothermal temperatures. This new turbodrill uses a special gear assembly to reduce the output speed, thus allowing a larger range of bit types, especially tri-cone roller bits, which are the bits of choice for drilling hard crystalline formations. The Advanced Geothermal Turbodrill (AGT) represents a significant improvement for drilling geothermal wells and has the potential to significantly reduce drilling costs while increasing production, thereby making geothermal energy less expensive and better able to compete with fossil fuels. The final field test of the AGT will prepare the tool for successful commercialization.« less
Code of Federal Regulations, 2011 CFR
2011-07-01
... MINERALS REVENUE MANAGEMENT RELIEF OR REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General Royalty Relief for Drilling Ultra-Deep Wells on Leases Not Subject to Deep Water Royalty Relief § 203.35 What... Development in writing of your intent to begin drilling operations on all your ultra-deep wells. (b) Before...
Application of seismic interpretation in the development of Jerneh Field, Malay Basin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yusoff, Z.
1994-07-01
Development of the Jerneh gas field has been significantly aided by the use of 3-D and site survey seismic interpretations. The two aspects that have been of particular importance are identification of sea-floor and near-surface safety hazards for safe platform installation/development drilling and mapping of reservoirs/hydrocarbons within gas-productive sands of the Miocene groups B, D, and E. Choice of platform location as well as casing design require detailed analysis of sea-floor and near-surface safety hazards. At Jerneh, sea-floor pockmarks near-surface high amplitudes, distributary channels, and minor faults were recognized as potential operational safety hazards. The integration of conventional 3-D andmore » site survey seismic data enabled comprehensive understanding of the occurrence and distribution of potential hazards to platform installation and development well drilling. Three-dimensional seismic interpretation has been instrumental not only in the field structural definition but also in recognition of reservoir trends and hydrocarbon distribution. Additional gas reservoirs were identified by their DHI characteristics and subsequently confirmed by development wells. The innovative use of seismic attribute mapping techniques has been very important in defining both fluid and reservoir distribution in groups B and D. Integration of 3-D seismic data and well-log interpretations has helped in optimal field development, including the planning of well locations and drilling sequence.« less
International Oil and Gas Exploration and Development
1993-01-01
Presents country level data on oil reserves, oil production, active drilling rigs, seismic crews, wells drilled, oil reserve additions, and oil reserve to production ratios (R/P ratios) for about 85 countries, where available, from 1970 through 1991. World and regional summaries are given in both tabular and graphical form.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nykjaer, O.
1994-12-31
This paper presents the history of the development of an oil rim in a chalk gas field. In a low relief gas field, oil rim development is problematic because the proximity to fluid contacts leads to gas and water coning and a significantly decreased oil production. This problem has been reduced in Tyra by developing the oil rim with horizontal wells. The best oil wells are in areas where gas production is impaired by tight chalk immediately above the gas-oil contact, and where the oil rim is thickest. The field was initially developed as a gas field due to poormore » production tests of the oil rim during the appraisal of the field. An understanding of the distribution of oil led to the drilling of a successful oil rim well. The advent of horizontal drilling increased the scope for oil rim development and accelerated the drilling of oil rim wells. Extensive reservoir simulation work provided the reservoir management tool for the planning of an oil rim development under the constraint of a gas sales agreement. It has resulted in a plan for further development of the Tyra gas field. According to the plan additional gas injection will in a period of seven years result in low net annual gas off-take from the Tyra gas production wells and the main production will instead come from horizontal wells in the oil-rim. During this time the majority of the oil reserves will be produced.« less
Towards a distributed infrastructure for research drilling in Europe
NASA Astrophysics Data System (ADS)
Mevel, C.; Gatliff, R.; Ludden, J.; Camoin, G.; Horsfield, B.; Kopf, A.
2012-04-01
The EC-funded project "Deep Sea and Sub-Seafloor Frontier" (DS3F) aims at developing seafloor and sub seafloor sampling strategies for enhanced understanding of deep-sea and sub seafloor processes by connecting marine research in life and geosciences, climate and environmental change, with socio-economic issues and policy building. DS3F has identified access to sub seafloor sampling and instrumentation as a key element of this approach. There is a strong expertise in Europe concerning direct access to the sub seafloor. Within the international program IODP (Integrated Ocean Drilling Program), ECORD (European Consortium for Ocean Research Drilling) has successfully developed the concept of mission specific platforms (MSPs), contracted on a project basis to drill in ice covered and shallow water areas. The ECORD Science Operator, lead by the British Geological Survey (BGS) has build a internationally recognized expertise in scientific ocean drilling, from coring in challenging environment, through down hole measurements and laboratory analysis to core curation and data management. MARUM, at the Bremen University in Germany, is one of the three IODP core repositories. Europe is also at the forefront of scientific seabed drills, with the MeBo developed by MARUM as well as the BGS seabed rocks drills. Europe also plays a important role in continental scientific drilling and the European component of ICDP (International Continental Scientific Drilling Program) is strengthening, with the recent addition of France and foreseen addition of UK. Oceanic and continental drilling have very similar scientific objectives. Moreover, they share not only common technologies, but also common data handling systems. To develop an integrated approach to technology development and usage, a move towards a a distributed infrastructure for research drilling in Europe has been initiated by these different groups. Built on existing research & operational groups across Europe, it will facilitate the sharing of technological and scientific expertise for the benefit of the science community. It will link with other relevant infrastructure initiatives such as EMSO (European Marine Seafloor Observatories). It will raise the profile of scientific drilling in Europe and hopefully lead to better funding opportunities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Quam, S.
The Nigerian National Petroleum Corporation/Chevron Nigeria Limited joint venture has been acquiring three-dimensional (3-D) seismic data over its concessions since 1984. To date, 1700 km[sup 2] have been recorded and processed at a cumulative cost of US $39 million. During 1991 - 1992, 20 development wells were drilled based directly on new 3-D seismic interpretations. These wells have added 148 million bbl of oil in new recoverable reserves, and to date have added 37,000 bbl/day to the joint venture's production. In addition, the 3-D interpretations have resulted in a sizable inventory of wells for future development drilling. The new 3-Dmore » interpretations provided more accurate pictures of fault patterns, fluid contacts, channel trends, stratigraphic continuity, and velocity/amplitude anomalies. In addition, the 3-D data were invaluable in designing low risk, directional well trajectories to tap relatively thin oil legs under large gas caps. Wells often were programmed to hit several objectives at their respective gas/oil contacts, resulting in maximized net oil sand pays and reducing the risk of gas production. In order to do this, directional [open quotes]sharpshooting,[close quotes] accurate depth conversion of the seismic time maps, was critical. By using the 3-D seismic, checkshot, and sonic data to develop a variable velocity space, well-top prognoses within 50 ft at depths of 6,000-10,000 ft were possible, and were key to the success of the program. As the joint venture acreage becomes more mature, development wells will be drilled for smaller numbers of stacked objectives, and sometimes for single sands. Highly accurate 3-D interpretations and depth conversions will become even more critical in order to tap thinner pay zones in a cost-effect manner.« less
Auto Indexer Auto-Indexer for Percussive Hammers: Vane Motor Dynamometer Testing
Su, Jiann
2012-01-01
Objectives Options associated with geothermal drilling operations are generally limited by factors such as formation temperature and rock strength. The objective of the research is to expand the "tool box" available to the geothermal driller by furthering the development of a high-temperature drilling motor that can be used in directional drilling applications for drilling high temperature geothermal formations. The motor is specifically designed to operate in conjunction with a pneumatic down-the-hole-hammer. It provides a more compact design compared to traditional drilling motors such as PDMs (positive displacement motors). The packaging can help to enhance directional drilling capabilities. It uses no elastomeric components, which enables it to operate in higher temperatures ( >250 °F). Current work on the motor has shown that is a capable of operating under pneumatic power with a down-the-hole-hammer. Further development work will include continued testing and refining motor components and evaluating motor capabilities. Targets/Milestones Complete testing current motor - 12/31/2010 Make final material and design decisions - 01/31/2011 Build and test final prototype - 04/31/2011 Final demonstration - 07/31/2011 Impacts The development of the motor will help to achieve program technical objectives by improving well construction capabilities. This includes enabling high-temperature drilling as well as enhancing directional drilling. A key component in the auto indexer is the drive motor. It is an air-driven vane motor that converts the energy stored in the compressed air to mechanical energy. The motor is attached to hammer-like components which impart an impulsive load onto the drive shaft. The impulsive force on the drive shaft in turn creates an indexing action. A controlled test was performed to characterize the performance of the the vane motor for a given pressure. The Sandia dynamometer test station was used to determine the performance of the motor for a given input pressure.
A proposal to investigate higher enthalpy geothermal systems in the USA
NASA Astrophysics Data System (ADS)
Elders, W. A.
2013-12-01
After more than 50 years of development only ~3,400 MWe of electric power is currently being produced from geothermal resources in the USA. That is only about 0.33% of the country's total installed electrical capacity. In spite of the large demonstrated potential of geothermal resources, only ~2,500 MWe of new geothermal electrical capacity are under development, and the growth rate of this environmentally benign energy resource is overshadowed by the rapid increase in the installed capacity of wind and solar energy. Most of the new geothermal developments in the USA involve relatively small, moderate-temperature, geothermal systems. In contrast, development of higher enthalpy geothermal systems for power production has obvious advantages; specifically higher temperatures yield higher power outputs per well so that fewer wells are needed, leading to smaller environmental footprints for a given size of power plant. Disadvantages include that the fact that locations of suitable geothermal systems are restricted to young volcanic terrains, production of very high enthalpy fluids usually requires drilling deeper wells and may require enhanced geothermal (EGS) technology, and drilling deep into hot hostile environments is technologically challenging. However the potential for very favorable economic returns suggests that the USA should begin developing such a program. One approach to mitigating the cost issue is to form a consortium of industry, government and academia to share the costs and broaden the scope an investigation. An excellent example of such a collaboration is the Iceland Deep Drilling Project (IDDP) which is investigating the economic feasibility of producing electricity from supercritical geothermal reservoirs. This industry-government consortium planned to drill a deep well in the volcanic caldera of Krafla in NE Iceland. However drilling had to be terminated at 2.1 km depth when 900°C rhyolite magma flowed into the well. The resultant well was highly productive capable of generating >35 MWe from superheated steam at a well-head temperature of ~450°C. Plans for deep drilling to explore for deeper, much higher enthalpy, geothermal resources are already underway in the Taupo Volcanic Zone of New Zealand (Project HADES), and in northeast Japan the 'Beyond Brittle Project' (Project JBBP) is an ambitious program attempting to create an EGS reservoir in ~500oC rocks. However in the USA there is no comparable national program to develop such resources. There is a significant undeveloped potential for developing high-enthalpy geothermal systems in the western USA, Hawaii and Alaska. The purpose of this paper is to encourage the formation of a consortium to systematically explore, assess, and eventually develop such higher-enthalpy geothermal resources. Not only would this help develop large new sources of energy but it would permit scientific studies of pressure-temperature regimes not otherwise available for direct investigation, such as the coupling of magmatic and hydrothermal systems.
30 CFR 250.410 - How do I obtain approval to drill a well?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false How do I obtain approval to drill a well? 250... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.410 How do I obtain approval to drill a well? You...
30 CFR 250.410 - How do I obtain approval to drill a well?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false How do I obtain approval to drill a well? 250... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.410 How do I obtain approval to drill a well? You...
30 CFR 250.410 - How do I obtain approval to drill a well?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.410 How do I obtain approval to drill a well? You must obtain written... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How do I obtain approval to drill a well? 250...
30 CFR 250.410 - How do I obtain approval to drill a well?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false How do I obtain approval to drill a well? 250... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.410 How do I obtain approval to drill a well? You...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khin, J.A.
Since reopening to foreign operators in 1989, companies have secured concessions and begun active exploration programs. This paper reports on: Yukong Oil (Block C) spudded well Indaw YK-1 last December and continued drilling below 8,500 ft. Well encountered frequent gas cut mud as well as lost circulation. BHP (Block H) spudded the Kawliya-1 in March this year and drilled to 6,500 ft. The well was dry and abandoned BHP plans to drill another well this year. Unocal (Block F) spudded its first well, the Kandaw-1, in May and plans to drill to 14,500 ft. Shell (Block G) began its firstmore » well in June. Shell's drilling program will consist of drilling four to six wells. Idemitsu (Block D) also spudded its first well in June. PetroCanada (Block E) plans to spud a well by December. Target depth is 12,000 ft.« less
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Can my operations plan, drilling permit... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can my operations plan, drilling permit, and drilling program apply to more than one well? (a) Your...
National and regional trends in water-well drilling in the United States, 1964-84
Hindall, S.M.; Eberle, Michael
1989-01-01
Information on national and regional water-well drilling activity is important for water-resource planning and management and for water-related equipment marketing. This report describes a study to analyze drilling trends on the basis of data for selected years from 1964 through 1984. The study focused primarily on the years 1964 and 1980-84 but also included data from 1960. Approximately 397,000 water wells were drilled in the United States in 1984. Seven States, Florida, Texas, New York, Michigan, North Carolina, Virginia, and Ohio, accounted for 39 percent of all the wells drilled in the United States in 1984. Florida led the Nation in drilling activity with 45,600 new wells. The 1984 national drilling total was 2.6 percent greater than the total for 1980 (387,000) and 8.5 percent less than the total for 1964 (434,000). However, these moderate differences do not reflect substantial year-to-year fluctuations that may have occurred during that 20-year period. Qualitative comparisons suggest that drilling activity for a given year is closely related to the number of housing starts for that year. If so, there may have been peaks in drilling activity in 1972 and 1977-78 (corresponding to peaks in housing starts) that are not identified in this study because of a lack of available well-drilling data for those years. Well-drilling data for 1964 and the 1980-84 period probably represent a low to moderate level of drilling activity and, if compared to earlier data, suggest that there has been no substantial growth or decline in the water-well industry as a whole since the 1940's.
National and regional trends in water-well drilling in the United States, 1964-84
Hindall, S.M.; Eberle, Michael
1987-01-01
Information on national and regional water well drilling activity is important for water resource planning and management and for water related equipment marketing. A study was conducted to analyze drilling trends on the basis of data for selected years from 1964 through 1984. The study focused primarily on the years 1964 and 1980-84, but also included data from 1960. Approximately 397,000 water wells were drilled in the United States in 1984. Seven states--Florida, Texas, New York, Michigan , North Carolina, Virginia, and Ohio--accounted for 39% of all the wells drilled in the United States in 1984. Florida led the nation in drilling activity with 45,600 new wells. The 1984 national drilling total was 2.6% > the total for 1980 (387,000) and 8.5% < the total for 1964 (434,000). However, these moderate differences do not reflect substantial year-to-year fluctuations that may have occurred during that 20-yr period. Qualitative comparisons suggest that drilling activity for a given year is closely related to the number of housing starts for that year. If so, there may have been peaks in drilling activity in 1972 and 1977-78 (corresponding to peaks in housing starts) that are not identified in this study because of a lack of available well drilling data for those years. Well drilling data for 1964 and the 1980-84 period probably represent a low to moderate level of drilling activity, and, if compared to earlier data, suggest that there has been no substantial growth or decline in the water well industry as a whole since the 1940's. (Author 's abstract)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Gulf Research and Development Company is implementing a DOE-sponsored Underground Coal Gasification project in Steeply Dipping Coal Beds (UCG/SDB) in order to assess the economic and technical viability of UCG in SDB. In the Fall 1980 drilling program, 2 vertical and 2 slant process wells; 3 hydrologic and 1 exploratory well and 4 HFEM wells were completed. The Spring, 1981 program will consist of drilling the remaining instrumentation wells necessary to track the progress of the underground reactor in real time. These will consist of: 6 additional High Frequency Electromagnetic wells (HFEM) and 3 extensometer wells (X). These wells willmore » be installed vertically with an expected deviation of two degrees or less.« less
30 CFR 250.466 - What records must I keep?
Code of Federal Regulations, 2013 CFR
2013-07-01
... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations..., legible, and accurate records for each well. You must keep drilling records onsite while drilling activities continue. After completion of drilling activities, you must keep all drilling and other well...
30 CFR 250.466 - What records must I keep?
Code of Federal Regulations, 2012 CFR
2012-07-01
... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations..., legible, and accurate records for each well. You must keep drilling records onsite while drilling activities continue. After completion of drilling activities, you must keep all drilling and other well...
30 CFR 250.466 - What records must I keep?
Code of Federal Regulations, 2014 CFR
2014-07-01
... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations..., legible, and accurate records for each well. You must keep drilling records onsite while drilling activities continue. After completion of drilling activities, you must keep all drilling and other well...
30 CFR 250.413 - What must my description of well drilling design criteria address?
Code of Federal Regulations, 2011 CFR
2011-07-01
... design criteria address? 250.413 Section 250.413 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT... must my description of well drilling design criteria address? Your description of well drilling design... drilling and the completion phases, including the anticipated surface pressure used for designing the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
McGrew, H.J.
Exploration in central and southern Africa continued to expand during 1980. The greatest concentration of activity was in Nigeria. However, there was considerable increase in the level of exploratory work in Cameroon and Congo. Significant new finds have been made in Ivory Coast. Geological and geophysical activity was carried out in 18 of the countries, with those in the western part having the largest share. Seismic work involved 225 party months of operation. Most of this time was spent on land, but marine operations accounted for 73,389 km of new control. Gravity and magnetic data were recorded during the marinemore » surveys, and several large aeromagnetic projects were undertaken to obtain a total of 164,498 line km of data. Exploratory and development drilling accounted for a total of 304 wells and 2,605,044 ft (794,212 m) of hole. The 92 exploratory wells that were drilled resulted in 47 oil and gas discoveries. In development drilling 89% of the 212 wells were successful. At the end of the year, 27 exploratory wells were underway, and 34 development wells were being drilled for a total of 61. Oil production from the countries that this review covers was 918,747,009 bbl in 1980, a drop of about 9% from the previous year. Countries showing a decline in production were Nigeria, Gabon, Cabinda, and Zaire. Increases were recorded in Cameroon, Congo, and Ghana. A new country was added to the list of producers when production from the Belier field in Ivory Coast came on stream. 33 figures, 15 tables.« less
Wolaver, Brad D; Pierre, Jon Paul; Ikonnikova, Svetlana A; Andrews, John R; McDaid, Guinevere; Ryberg, Wade A; Hibbitts, Toby J; Duran, Charles M; Labay, Benjamin J; LaDuc, Travis J
2018-04-13
Directional well drilling and hydraulic fracturing has enabled energy production from previously inaccessible resources, but caused vegetation conversion and landscape fragmentation, often in relatively undisturbed habitats. We improve forecasts of future ecological impacts from unconventional oil and gas play developments using a new, more spatially-explicit approach. We applied an energy production outlook model, which used geologic and economic data from thousands of wells and three oil price scenarios, to map future drilling patterns and evaluate the spatial distribution of vegetation conversion and habitat impacts. We forecast where future well pad construction may be most intense, illustrating with an example from the Eagle Ford Shale Play of Texas. We also illustrate the ecological utility of this approach using the Spot-tailed Earless Lizard (Holbrookia lacerata) as the focal species, which historically occupied much of the Eagle Ford and awaits a federal decision for possible Endangered Species Act protection. We found that ~17,000-45,500 wells would be drilled 2017‒2045 resulting in vegetation conversion of ~26,485-70,623 ha (0.73-1.96% of pre-development vegetation), depending on price scenario ($40-$80/barrel). Grasslands and row crop habitats were most affected (2.30 and 2.82% areal vegetation reduction). Our approach improves forecasts of where and to what extent future energy development in unconventional plays may change land-use and ecosystem services, enabling natural resource managers to anticipate and direct on-the-ground conservation actions to places where they will most effectively mitigate ecological impacts of well pads and associated infrastructure.
NASA Astrophysics Data System (ADS)
Toropov, V. S.
2018-05-01
The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-08
... taking of marine mammals incidental to offshore exploration activities (e.g., seismic surveys and... drilling operations during the open water season in order for the industry to drill priority exploration..., helps to optimally locate exploration and development wells, maximizing extraction and production from a...
Multi-usages of the Ilan geothermal field, NE Taiwan
NASA Astrophysics Data System (ADS)
Lee, C. S.; Tseng, P.; Wang, S.; Chang, C.
2017-12-01
The tectonics of Taiwan is very dynamic. The area produces more than 30,000 earthquakes/year; the mountains uplift 4-5 cm/year; the rainfall culminates 3,000 mm/year; there are some 4,000 hot spring operators. One of the two hot geothermal areas is located in NE Taiwan - the Ilan geothermal field. In order to develop the geothermal energy for the electricity need, the Ministry of Science and Technology have provided the fund to drill two 2,500 deep wells. The results are not so encourage for the need of an Enhanced Geothermal System. However, one of the wells has a bottom temperature of 160oC and the water up loading with 60 ton/hr. This can be combined with the near-by wells drilled by the private drilling company and the Cardinal Tien Junior College of Healthcare and Management to develop the multi-usages of the geothermal energy, such as 1 MW of electricity for the college and village, the long-term healthcare and hot spring medicare, aquaculture and agriculture need etc. The universities and private drilling company cooperate together to join the development. Hope this will provide a new model for the need of a self-sufficient community. The geothermal is a clean, renewable, and no pollution energy. Taiwan is in an initial stage of using this green energy.
Make-up wells drilling cost in financial model for a geothermal project
NASA Astrophysics Data System (ADS)
Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun
2017-12-01
After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.
Staying in the zone: offshore drillers' situation awareness.
Roberts, Ruby; Flin, Rhona; Cleland, Jennifer
2015-06-01
The aim of this study was to identify the cognitive components required for offshore drillers to develop and maintain situation awareness (SA) while controlling subsea hydrocarbon wells. SA issues are often identified as contributing factors to drilling incidents, most recently in the Deepwater Horizon blowout. Yet, there is a limited body of research investigating SA in the offshore drilling environment. In the first study, critical incident interviews were conducted with 18 experienced drilling personnel. Transcripts were subjected to theory-driven thematic analysis, producing a preliminary cognitive framework of how drillers develop and maintain SA during well control. In the second study, 24 hr of observations (in vivo and video) of drillers managing a high fidelity well-control simulator were analyzed to further develop the framework. The cognitive components that enable drillers to build up an understanding of what is happening in the wellbore and surrounding environment, to predict how this understanding may develop, were identified. These components included cue recognition, interpretation of information in conjunction with the current mental model, and projection through mental simulation. Factors such as distracters, expectations, and information sharing between crew members can both positively and negatively influence the drillers' SA. The findings give a preliminary understanding into the components of drillers' SA, highlighting the importance of SA for safe and effective performance and indicating that Endsley's model of SA can be applied to drilling. The results have consequences for training, task management, and work design recommendations. © 2014, Human Factors and Ergonomics Society.
Arnold, Larry R. Rick
2015-01-01
During May–June, 2013, the U.S. Geological Survey, in cooperation with Park County, Colorado, drilled and installed four groundwater monitoring wells in areas identified as needing new wells to provide adequate spatial coverage for monitoring water quality in the South Park basin. Lithologic logs and well-construction reports were prepared for each well, and wells were developed after drilling to remove mud and foreign material to provide for good hydraulic connection between the well and aquifer. Slug tests were performed to estimate hydraulic-conductivity values for aquifer materials in the screened interval of each well, and groundwater samples were collected from each well for analysis of major inorganic constituents, trace metals, nutrients, dissolved organic carbon, volatile organic compounds, ethane, methane, and radon. Documentation of lithologic logs, well construction, well development, slug testing, and groundwater sampling are presented in this report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas C. Chidsey Jr; David E. Eby; Laura L. Wray
2003-12-01
Over 400 million barrels (64 million m{sup 3}) of oil have been produced from the shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation in the Paradox Basin, Utah and Colorado. With the exception of the giant Greater Aneth field, the other 100 plus oil fields in the basin typically contain 2 to 10 million barrels (0.3-1.6 million m{sup 3}) of original oil in place. Most of these fields are characterized by high initial production rates followed by a very short productive life (primary), and hence premature abandonment. Only 15 to 25 percent of the original oil in place ismore » recoverable during primary production from conventional vertical wells. An extensive and successful horizontal drilling program has been conducted in the giant Greater Aneth field. However, to date, only two horizontal wells have been drilled in small Ismay and Desert Creek fields. The results from these wells were disappointing due to poor understanding of the carbonate facies and diagenetic fabrics that create reservoir heterogeneity. These small fields, and similar fields in the basin, are at high risk of premature abandonment. At least 200 million barrels (31.8 million m{sup 3}) of oil will be left behind in these small fields because current development practices leave compartments of the heterogeneous reservoirs undrained. Through proper geological evaluation of the reservoirs, production may be increased by 20 to 50 percent through the drilling of low-cost single or multilateral horizontal legs from existing vertical development wells. In addition, horizontal drilling from existing wells minimizes surface disturbances and costs for field development, particularly in the environmentally sensitive areas of southeastern Utah and southwestern Colorado.« less
30 CFR 250.462 - What are the requirements for well-control drills?
Code of Federal Regulations, 2010 CFR
2010-07-01
... drills? 250.462 Section 250.462 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Other Drilling Requirements § 250.462 What are the requirements for well-control drills? You must...
Hydraulic studies of drilling microbores with supercritical steam, nitrogen and carbon dioxide
Ken Oglesby
2010-01-01
Hydraulic studies of drilling microbores at various depths and with various hole sizes, tubing, fluids and rates showed theoretical feasibility. WELLFLO SIMULATIONS REPORT STEP 4: DRILLING 10,000 FT WELLS WITH SUPERCRITICAL STEAM, NITROGEN AND CARBON DIOXIDE STEP 5: DRILLING 20,000 FT WELLS WITH SUPERCRITICAL STEAM, NITROGEN AND CARBON DIOXIDE STEP 6: DRILLING 30,000 FT WELLS WITH SUPERCRITICAL STEAM, NITROGEN AND CARBON DIOXIDE Mehmet Karaaslan, MSI
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1976-11-01
The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hotmore » brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.« less
Impedance matched joined drill pipe for improved acoustic transmission
Moss, William C.
2000-01-01
An impedance matched jointed drill pipe for improved acoustic transmission. A passive means and method that maximizes the amplitude and minimize the temporal dispersion of acoustic signals that are sent through a drill string, for use in a measurement while drilling telemetry system. The improvement in signal transmission is accomplished by replacing the standard joints in a drill string with joints constructed of a material that is impedance matched acoustically to the end of the drill pipe to which it is connected. Provides improvement in the measurement while drilling technique which can be utilized for well logging, directional drilling, and drilling dynamics, as well as gamma-ray spectroscopy while drilling post shot boreholes, such as utilized in drilling post shot boreholes.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., without regard to the drilling depth of the well producing the gas or oil. (b) If you have a royalty... qualified wells. Example to paragraph (b): You have two shallow oil wells on your lease. Then you drill a... suspension supplements from drilling one or two certified unsuccessful wells on my lease? 203.46 Section 203...
30 CFR 203.45 - If I drill a certified unsuccessful well, what royalty relief will my lease earn?
Code of Federal Regulations, 2011 CFR
2011-07-01
... REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General Royalty Relief for Drilling Deep Gas Wells on Leases Not Subject to Deep Water Royalty Relief § 203.45 If I drill a certified unsuccessful well, what... 30 Mineral Resources 2 2011-07-01 2011-07-01 false If I drill a certified unsuccessful well, what...
Proper nozzle location, bit profile, and cutter arrangement affect PDC-bit performance significantly
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia-Gavito, D.; Azar, J.J.
1994-09-01
During the past 20 years, the drilling industry has looked to new technology to halt the exponentially increasing costs of drilling oil, gas, and geothermal wells. This technology includes bit design innovations to improve overall drilling performance and reduce drilling costs. These innovations include development of drag bits that use PDC cutters, also called PDC bits, to drill long, continuous intervals of soft to medium-hard formations more economically than conventional three-cone roller-cone bits. The cost advantage is the result of higher rates of penetration (ROP's) and longer bit life obtained with the PDC bits. An experimental study comparing the effectsmore » of polycrystalline-diamond-compact (PDC)-bit design features on the dynamic pressure distribution at the bit/rock interface was conducted on a full-scale drilling rig. Results showed that nozzle location, bit profile, and cutter arrangement are significant factors in PDC-bit performance.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-08-01
This paper reports that Major activity in 1990 was Israel National Oil Co.'s startup in November of a $30 million exploratory drilling program near the Dead Sea. Isramco's deep Yam 2 offshore wildcat was apparently suspended after gas shows and mechanical problems. In 1990, the Negev venture 2, led by Isramco, acquired an additional one million-acre offshore exploration license between Ashdod (offshore from which Yam 2 was sited) and Haifa. The group plans a $40-million three-well program. Drilling last year totaled four wells and 31,114 ft of hole. Included were one oil well extension and three dry holes. This year,more » eight onshore wildcats and two development wells, plus one offshore wildcat are expected to be drilled. Production averaged only 248 bopd and 3.2 MMcfgd in 1990. Reserves are estimated at 1.3 million bbl of oil and 6.8 bcfg.« less
Oyo-first field Deepwater Nigeria?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lilletveit, R.; Nelson, L.; Osahon, G.
The Oyo-1 well was drilled in 3Q95 in OPL 210. The partners in the block are Allied Energy (Operator) and the Statoil and BP Alliance. This well was the first well drilled in Deepwater Nigeria and is a reported hydrocarbon discovery. Although the well was within the Niger Delta depositional system, the deepwater play types drilled were quite different than anything previously tested on the Nigerian shelf or onshore. One year on, some of the questions to be asked are: (1) What did Oyo-1 discover? (2) What has been done to establish the commerciality, or otherwise, of the hydrocarbon poolsmore » encountered? (3) What impact does this discovery have on other prospects identified in the deepwater area? The answer to these questions will help to identify whether a new hydrocarbon province in the deepwater Nigeria area can be developed, or not.« less
Scientific Drilling in the Arctic Ocean: A challenge for the next decades
NASA Astrophysics Data System (ADS)
Stein, R.; Coakley, B.
2009-04-01
Although major progress in Arctic Ocean research has been made during the last decades, the knowledge of its short- and long-term paleoceanographic and paleoclimatic history as well as its plate-tectonic evolution is much behind that from the other world's oceans. That means - despite the importance of the Arctic in the climate system - the data base we have from this area is still very weak, and large parts of the climate history have not been recovered at all in sedimentary sections. This lack of knowledge is mainly caused by the major technological/ logistic problems in reaching this permanently ice-covered region with normal research vessels and in retrieving long and undisturbed sediment cores. With the successful completion of IODP Expedition 302 ("Arctic Coring Expedition" - ACEX), the first Mission Specific Platform (MSP) expedition within the Integrated Ocean Drilling Program - IODP, a new era in Arctic research has begun. For the first time, a scientific drilling in the permanently ice-covered Arctic Ocean was carried out, penetrating about 430 meters of Quaternary, Neogene, Paleogene and Campanian sediment on the crest of Lomonosov Ridge close to the North Pole. The success of ACEX has certainly opened the door for further scientific drilling in the Arctic Ocean, and will frame the next round of questions to be answered from new drill holes to be taken during the next decades. In order to discuss and plan the future of scientific drilling in the Arctic Ocean, an international workshop was held at the Alfred Wegener Institute (AWI) in Bremerhaven/Germany, (Nov 03-05, 2008; convenors: Bernard Coakley/University of Alaska Fairbanks and Ruediger Stein/AWI Bremerhaven). About 95 scientists from Europe, US, Canada, Russia, Japan, and Korea, and observers from oil companies participated in the workshop. Funding of the workshop was provided by the Consortium for Ocean Leadership (US), the European Science Foundation, the Arctic Ocean Sciences Board, and the Nansen Arctic Drilling Program as well as by sponsorships from British Petroleum, ConocoPhillips, ExxonMobil, Norwegian Petroleum Directorate, StatoilHydro, and Shell International. The major targets of the workshop were: (1) to bring together an international group of Arctic scientists, young scientists and ocean drilling scientists to learn and exchange ideas, experience and enthusiasm about the Arctic Ocean; (2) to develop a scientific drilling strategy to investigate the tectonic and paleoceanographic history of the Arctic Ocean and its role in influencing the global climate system; (3) to summarize the technical needs, opportunities, and limitations of drilling in the Arctic; (4) to define scientific and drilling targets for specific IODP-type campaigns in Arctic Ocean key areas to be finalized in the development of drilling proposals. Following overview presentations about the history of the Arctic Ocean, legacy of high-latitude ocean drilling, existing site-survey database, technical needs for high-latitude drilling, possibilities of collaboration with industry, and the process of developing ocean-drilling legs through IODP, the main part of the workshop was spent in thematic and regional break-out groups discussing the particular questions to be addressed by drilling and the particular targets for Arctic scientific drilling. Within the working groups, key scientific questions (related to the overall themes paleoceanography, tectonic evolution, petrology/geochemistry of basement, and gas hydrates) and strategies for reaching the overall goals were discussed and - as one of the main results - core groups for further developing drilling proposals were formed. Based on discussions at this workshop, approximately ten new pre-proposals are planned to be submitted to IODP for the April 01- 2009 deadline. We hope that the development of new scientific objectives through the pre-proposal process will help reshape plans for scientific ocean drilling beyond 2013 and direct the program north towards these critical priorities and advance exploration of the Arctic.
Baseline groundwater chemistry characterization in an area of future Marcellus shale gas development
NASA Astrophysics Data System (ADS)
Eisenhauer, P.; Zegre, N.; Edwards, P. J.; Strager, M.
2012-12-01
The recent increase in development of the Marcellus shale formation for natural gas in the mid-Atlantic can be attributed to advances in unconventional extraction methods, namely hydraulic fracturing, a process that uses water to pressurize and fracture relatively impermeable shale layers to release natural gas. In West Virginia, the Department of Energy estimates 95 to 105 trillion cubic feet (TCF) of expected ultimately recovery (EUR) of natural gas for this formation. With increased development of the Marcellus shale formation comes concerns for the potential of contamination to groundwater resources that serve as primary potable water sources for many rural communities. However, the impacts of this practice on water resources are poorly understood because of the lack of controlled pre versus post-drilling experiments attributed to the rapid development of this resource. To address the knowledge gaps of the potential impacts of Marcellus shale development on groundwater resources, a pre versus post-drilling study has been initiated by the USFS Fernow Experimental Forest in the Monongahela National Forest. Drilling is expected to start at three locations within the next year. Pre-drilling water samples were collected and analyzed from two groundwater wells, a shallow spring, a nearby lake, and river to characterize background water chemistry and identify potential end-members. Geochemical analysis includes major ions, methane, δ13C-CH4, δ2H-CH4, 226Radium, and δ13C-DIC. In addition, a GIS-based conceptual ground water flow model was developed to identify possible interactions between shallow groundwater and natural gas wells given gas well construction failure. This model is used to guide management decisions regarding groundwater resources in an area of increasing shale gas development.
NASA Astrophysics Data System (ADS)
Toropov, S. Yu; Toropov, V. S.
2018-05-01
In order to design more accurately trenchless pipeline passages, a technique has been developed for calculating the passage profile, based on specific parameters of the horizontal directional drilling rig, including the range of possible drilling angles and a list of compatible drill pipe sets. The algorithm for calculating the parameters of the trenchless passage profile is shown in the paper. This algorithm is based on taking into account the features of HDD technology, namely, three different stages of production. The authors take into account that the passage profile is formed at the first stage of passage construction, that is, when drilling a pilot well. The algorithm involves calculating the profile by taking into account parameters of the drill pipes used and angles of their deviation relative to each other during the pilot drilling. This approach allows us to unambiguously calibrate the designed profile for the HDD rig capabilities and the auxiliary and navigation equipment used in the construction process.
Drew, L.J.; Schuenemeyer, J.H.; Amstrong, T.R.; Sutphin, D.M.
2001-01-01
A model is proposed to explain the statistical relations between the mean initial water well yields from eight time increments from 1984 to 1998 for wells drilled into the crystalline bedrock aquifer system in the Pinardville area of southern New Hampshire and the type of bedrock, mean well depth, and mean well elevation. Statistical analyses show that the mean total yield of drilling increments is positively correlated with mean total well depth and mean well elevation. In addition, the mean total well yield varies with rock type from a minimum of 46.9 L/min (12.4 gpm) in the Damon Pond granite to a maximum of 74.5 L/min (19.7 gpm) in the Permian pegmatite and granite unit. Across the eight drilling increments that comprise 211 wells each, the percentages of very low-yield wells (1.9 L/min [0.5 gpm] or less) and high-yield wells (151.4 L/min [40 gpm] or more) increased, and those of intermediate-yield wells decreased. As housing development progressed during the 1984 to 1998 interval, the mean depth of the wells and their elevations increased, and the mix of percentages of the bedrock types drilled changed markedly. The proposed model uses a feed-forward mechanism to explain the interaction between the increasing mean elevation, mean well depth, and percentages of very low-yielding wells and the mean well yield. The increasing percentages of very low-yielding wells through time and the economics of the housing market may control the system that forces the mean well depths, percentages of high-yield wells, and mean well yields to increase. The reason for the increasing percentages of very low-yield wells is uncertain, but the explanation is believed to involve the complex structural geology and tectonic history of the Pinardville quadrangle.
43 CFR 3252.12 - How deep may I drill a temperature gradient well?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How deep may I drill a temperature... RESOURCE LEASING Conducting Exploration Operations § 3252.12 How deep may I drill a temperature gradient well? (a) You may drill a temperature gradient well to any depth that we approve in your exploration...
43 CFR 3252.12 - How deep may I drill a temperature gradient well?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How deep may I drill a temperature... RESOURCE LEASING Conducting Exploration Operations § 3252.12 How deep may I drill a temperature gradient well? (a) You may drill a temperature gradient well to any depth that we approve in your exploration...
43 CFR 3252.12 - How deep may I drill a temperature gradient well?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false How deep may I drill a temperature... RESOURCE LEASING Conducting Exploration Operations § 3252.12 How deep may I drill a temperature gradient well? (a) You may drill a temperature gradient well to any depth that we approve in your exploration...
43 CFR 3252.12 - How deep may I drill a temperature gradient well?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How deep may I drill a temperature... RESOURCE LEASING Conducting Exploration Operations § 3252.12 How deep may I drill a temperature gradient well? (a) You may drill a temperature gradient well to any depth that we approve in your exploration...
Lin, Yanping; Chen, Huajiang; Yu, Dedong; Zhang, Ying; Yuan, Wen
2017-01-01
Bone drilling simulators with virtual and haptic feedback provide a safe, cost-effective and repeatable alternative to traditional surgical training methods. To develop such a simulator, accurate haptic rendering based on a force model is required to feedback bone drilling forces based on user input. Current predictive bone drilling force models based on bovine bones with various drilling conditions and parameters are not representative of the bone drilling process in bone surgery. The objective of this study was to provide a bone drilling force model for haptic rendering based on calibration and validation experiments in fresh cadaveric bones with different bone densities. Using a commonly used drill bit geometry (2 mm diameter), feed rates (20-60 mm/min) and spindle speeds (4000-6000 rpm) in orthognathic surgeries, the bone drilling forces of specimens from two groups were measured and the calibration coefficients of the specific normal and frictional pressures were determined. The comparison of the predicted forces and the measured forces from validation experiments with a large range of feed rates and spindle speeds demonstrates that the proposed bone drilling forces can predict the trends and average forces well. The presented bone drilling force model can be used for haptic rendering in surgical simulators.
Bridging worlds/charting new courses
NASA Astrophysics Data System (ADS)
This report describes the work being done within Sandia's renewable energy program. This work touches on four major disciplines. (1) Photovoltaics. The goal of this project is to develop costeffective, reliable energy system technologies for energy supplies worldwide produced by U.S. industry. It encompasses cell research and development, collector development, technology evaluation, systems engineering, domestic and international applications, and design assistance. (2) Solar Thermal. This project endeavors to develop and increase acceptance of solar thermal electric and industrial technologies as cost-competitive candidates for power generation and to promote their commercialization. Its' major activities are with dish/Stirling systems, the Solar Two power tower, design assistance to industry and users, technology development and research activities. (3) Wind. The wind project impacts domestic and international markets with commercially feasible systems for utility-scale and other applications of wind energy. The project conducts applied research in aerodynamics, structural dynamics, fatigue, materials and controls, and engineering systems, and develops cooperative work with industry. (4) Geothermal. This project is developing technology to increase proven geothermal reserves and is assisting industry in expanding geothermal power on-line. Development work is in stemhole drilling, drilling techniques, instrumentation for geothermal wells, acoustic telemetry, and drilling exploratory wells.
He, Jiang-Fu; Liang, Yun-Pei; Li, Li-Jia; Luo, Yong-Jiang
2018-01-01
Rapid horizontal directional well drilling in hard or fractured formations requires efficient drilling technology. The penetration rate of conventional hard rock drilling technology in horizontal directional well excavations is relatively low, resulting in multiple overgrinding of drill cuttings in bottom boreholes. Conventional drilling techniques with reamer or diamond drill bit face difficulties due to the long construction periods, low penetration rates, and high engineering costs in the directional well drilling of hard rock. To improve the impact energy and penetration rate of directional well drilling in hard formations, a new drilling system with a percussive and rotary drilling technology has been proposed, and a hydro-hammer with a jet actuator has also been theoretically designed on the basis of the impulse hydro-turbine pressure model. In addition, the performance parameters of the hydro-hammer with a jet actuator have been numerically and experimentally analyzed, and the influence of impact stroke and pumped flow rate on the motion velocity and impact energy of the hydro-hammer has been obtained. Moreover, the designed hydro-hammer with a jet actuator has been applied to hard rock drilling in a trenchless drilling program. The motion velocity of the hydro-hammer ranges from 1.2 m/s to 3.19 m/s with diverse flow rates and impact strokes, and the motion frequency ranges from 10 Hz to 22 Hz. Moreover, the maximum impact energy of the hydro-hammer is 407 J, and the pumped flow rate is 2.3 m3/min. Thus, the average penetration rate of the optimized hydro-hammer improves by over 30% compared to conventional directional drilling in hard rock formations.
He, Jiang-fu; Li, Li-jia; Luo, Yong-jiang
2018-01-01
Rapid horizontal directional well drilling in hard or fractured formations requires efficient drilling technology. The penetration rate of conventional hard rock drilling technology in horizontal directional well excavations is relatively low, resulting in multiple overgrinding of drill cuttings in bottom boreholes. Conventional drilling techniques with reamer or diamond drill bit face difficulties due to the long construction periods, low penetration rates, and high engineering costs in the directional well drilling of hard rock. To improve the impact energy and penetration rate of directional well drilling in hard formations, a new drilling system with a percussive and rotary drilling technology has been proposed, and a hydro-hammer with a jet actuator has also been theoretically designed on the basis of the impulse hydro-turbine pressure model. In addition, the performance parameters of the hydro-hammer with a jet actuator have been numerically and experimentally analyzed, and the influence of impact stroke and pumped flow rate on the motion velocity and impact energy of the hydro-hammer has been obtained. Moreover, the designed hydro-hammer with a jet actuator has been applied to hard rock drilling in a trenchless drilling program. The motion velocity of the hydro-hammer ranges from 1.2 m/s to 3.19 m/s with diverse flow rates and impact strokes, and the motion frequency ranges from 10 Hz to 22 Hz. Moreover, the maximum impact energy of the hydro-hammer is 407 J, and the pumped flow rate is 2.3 m3/min. Thus, the average penetration rate of the optimized hydro-hammer improves by over 30% compared to conventional directional drilling in hard rock formations. PMID:29768421
The Iceland Deep Drilling Project (IDDP): (I) A New Era in Geothermal Development?
NASA Astrophysics Data System (ADS)
Elders, W. A.; Fridleifsson, G. O.; Bird, D. K.; Reed, M. H.; Schiffman, P.; Zierenberg, R.
2007-12-01
The Iceland Deep Drilling Project (IDDP) announced in September 2007 that an international industrial consortium has signed a new contract to collaborate in exploratory deep drilling in Iceland. The main objective of the IDDP is to investigate whether it is economically feasible to produce energy from geothermal systems at supercritical conditions. This will require drilling to depths of 4 to 5 km in order to reach temperatures of 400 to 600°C. Today, geothermal wells in Iceland typically range up to 2.5 km in depth and produce steam at about 300°C, or less, at a rate sufficient to generate about 4 to 7 megawatts of electricity. It is estimated that producing steam from a well penetrating a reservoir with temperatures >450°C, and at a rate of 0.67 cubic meters a second, could generate 40 to 50 MWe. If IDDP's test of this concept proves successful, it could lead to major improvements in the development of high-temperature geothermal resources worldwide. The consortium collaborating to fund this investigation of supercritical geothermal energy consists of three leading Icelandic power companies, Hitaveita Sudurnesja Ltd., Landsvirkjun, Orkuveita Reykjavikur, together with Orkustofnun (the National Energy Authority) and Alcoa Inc. (an international aluminum company). The three power companies financed a feasibility study for the project that was completed in 2003. Each of the three power companies is committed to drill, at their own cost, a 3.5 to 4.0 km deep well in a geothermal field that they operate. The design of these wells will permit them to be deepened to 4.5 or 5.0 km by the IDDP, and funded by the consortium with additional funds from international scientific agencies. The first deep IDDP well will be drilled in the latter part of 2008 in the Krafla geothermal field near the northern end of the central rift zone of Iceland, within a volcanic caldera that has had recent volcanic activity. Two new wells, ~4 km deep, will then be drilled at the Hengill and the Reykjanes geothermal fields during 2009-2010, and subsequently deepened. In contrast to the fresh water systems at Krafla and Hengill, the Reykjanes geothermal system produces hydrothermally modified seawater on the Reykjanes peninsula, in southern Iceland, where the Mid-Atlantic Ridge comes on land in southern Iceland. Processes at depth at Reykjanes should be similar to those responsible for black smokers on ocean spreading centers. The IDDP has engendered considerable international scientific interest. The US National Science Foundation and the International Continental Scientific Drilling Program will jointly fund the coring and sampling for scientific studies. In preparation for studying the data and samples that will be recovered by deep drilling research is underway on samples from existing wells in the target geothermal fields, and on exposed "fossil" geothermal systems and active mid-ocean ridge systems that have conditions believed to be similar to those that will be encountered in deep drilling by the IDDP. Some of these initial scientific studies by US investigators are reported in the accompanying papers.
Myers, R.G.; Pinckley, K.M.
1984-01-01
Three test wells, T23, T29, and T30, were drilled in south-central New Mexico as part of a joint military training program sponsored by the U.S. Army in November 1982. Test well T23 was drilled as an exploratory and monitoring well in the proposed Soledad well field at the Fort Bliss Military Reservation. Test wells T29 and T30 were drilled at White Sands Missile Range. Test well T29 was drilled as an observation well in the vicinity of the outfall channel from the sewage treatment plant. Test well T30 was drilled as an observation well for a landfill south of the well site. Information obtained from these wells includes lithologic logs for all wells and borehole-geophysical logs from the cased wells for test wells T29 and T30. (USGS)
Marcellus Shale Drilling's Impact on the Dairy Industry in Pennsylvania: A Descriptive Report.
Finkel, Madelon L; Selegean, Jane; Hays, Jake; Kondamudi, Nitin
2013-01-01
Unconventional natural gas drilling in Pennsylvania has accelerated over the past five years, and is unlikely to abate soon. Dairy farming is a large component of Pennsylvania's agricultural economy. This study compares milk production, number of cows, and production per cow in counties with significant unconventional drilling activity to that in neighboring counties with less unconventional drilling activity, from 1996 through 2011. Milk production and milk cows decreased in most counties since 1996, with larger decreases occurring from 2007 through 2011 (when unconventional drilling increased substantially) in five counties with the most wells drilled compared to six adjacent counties with fewer than 100 wells drilled. While this descriptive study cannot draw a causal association between well drilling and decline in cows or milk production, given the importance of Pennsylvania's dairy industry and the projected increase in unconventional natural gas drilling, further research to prevent unintended economic and public health consequences is imperative.
NASA Astrophysics Data System (ADS)
Raef, Abdelmoneam; Totten, Matthew; Vohs, Andrew; Linares, Aria
2017-12-01
Thin hydrocarbon reservoir facies pose resolution challenges and waveform-signature opportunities in seismic reservoir characterization and prospect identification. In this study, we present a case study, where instantaneous frequency variation in response to a thin hydrocarbon pay zone is analyzed and integrated with other independent information to explain drilling results and optimize future drilling decisions. In Morrison NE Field, some wells with poor economics have resulted from well-placement incognizant of reservoir heterogeneities. The study area in Clark County, Kanas, USA, has been covered by a surface 3D seismic reflection survey in 2010. The target horizon is the Viola limestone, which continues to produce from 7 of the 12 wells drilled within the survey area. Seismic attributes extraction and analyses were conducted with emphasis on instantaneous attributes and amplitude anomalies to better understand and predict reservoir heterogeneities and their control on hydrocarbon entrapment settings. We have identified a higher instantaneous frequency, lower amplitude seismic facies that is in good agreement with distinct lithofacies that exhibit better (higher porosity) reservoir properties, as inferred from well-log analysis and petrographic inspection of well cuttings. This study presents a pre-drilling, data-driven approach of identifying sub-resolution reservoir seismic facies in a carbonate formation. This workflow will assist in placing new development wells in other locations within the area. Our low amplitude high instantaneous frequency seismic reservoir facies have been corroborated by findings based on well logs, petrographic analysis data, and drilling results.
Davis, James P; Struchtemeyer, Christopher G; Elshahed, Mostafa S
2012-11-01
We monitored the bacterial communities in the gas-water separator and water storage tank of two newly drilled natural gas wells in the Barnett Shale in north central Texas, using a 16S rRNA gene pyrosequencing approach over a period of 6 months. Overall, the communities were composed mainly of moderately halophilic and halotolerant members of the phyla Firmicutes and Proteobacteria (classes Βeta-, Gamma-, and Epsilonproteobacteria) in both wells at all sampling times and locations. Many of the observed lineages were encountered in prior investigations of microbial communities from various fossil fluid formations and production facilities. In all of the samples, multiple H(2)S-producing lineages were encountered; belonging to the sulfate- and sulfur-reducing class Deltaproteobacteria, order Clostridiales, and phylum Synergistetes, as well as the thiosulfate-reducing order Halanaerobiales. The bacterial communities from the separator and tank samples bore little resemblance to the bacterial communities in the drilling mud and hydraulic-fracture waters that were used to drill these wells, suggesting the in situ development of the unique bacterial communities in such well components was in response to the prevalent geochemical conditions present. Conversely, comparison of the bacterial communities on temporal and spatial scales suggested the establishment of a core microbial community in each sampled location. The results provide the first overview of bacterial dynamics and colonization patterns in newly drilled, thermogenic natural gas wells and highlights patterns of spatial and temporal variability observed in bacterial communities in natural gas production facilities.
Mathematical modeling of PDC bit drilling process based on a single-cutter mechanics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wojtanowicz, A.K.; Kuru, E.
1993-12-01
An analytical development of a new mechanistic drilling model for polycrystalline diamond compact (PDC) bits is presented. The derivation accounts for static balance of forces acting on a single PDC cutter and is based on assumed similarity between bit and cutter. The model is fully explicit with physical meanings given to all constants and functions. Three equations constitute the mathematical model: torque, drilling rate, and bit life. The equations comprise cutter`s geometry, rock properties drilling parameters, and four empirical constants. The constants are used to match the model to a PDC drilling process. Also presented are qualitative and predictive verificationsmore » of the model. Qualitative verification shows that the model`s response to drilling process variables is similar to the behavior of full-size PDC bits. However, accuracy of the model`s predictions of PDC bit performance is limited primarily by imprecision of bit-dull evaluation. The verification study is based upon the reported laboratory drilling and field drilling tests as well as field data collected by the authors.« less
Groundwater Exploration for Rural Communities in Ghana, West Africa
NASA Astrophysics Data System (ADS)
McKay, W. A.
2001-05-01
Exploration for potable water in developing countries continues to be a major activity, as there are more than one billion people without access to safe drinking water. Exploration for groundwater becomes more critical in regions where groundwater movement and occurrence is controlled by secondary features such as fractures and faults. Drilling success rates in such geological settings are generally very low, but can be improved by integrating geological, hydrogeological, aerial photo interpretation with land-based geophysical technology in the selection of drilling sites. To help alleviate water supply problems in West Africa, the Conrad N. Hilton Foundation and other donors, since 1990, have funded the World Vision Ghana Rural Water Project (GRWP) to drill wells for potable water supplies in the Greater Afram Plains (GAP) of Ghana. During the first two years of the program, drilling success rates using traditional methods ranged from 35 to 80 percent, depending on the area. The average drilling success rate for the program was approximately 50 percent. In an effort to increase the efficiency of drilling operations, the Desert Research Institute evaluated and developed techniques for application to well-siting strategies in the GAP area of Ghana. A critical project element was developing technical capabilities of in-country staff to independently implement the new strategies. Simple cost-benefit relationships were then used to evaluate the economic advantages of developing water resources using advanced siting methods. The application of advanced methods in the GAP area reveal an increase of 10 to 15 percent in the success rate over traditional methods. Aerial photography has been found to be the most useful of the imagery products covering the GAP area. An effective approach to geophysical exploration for groundwater has been the combined use of EM and resistivity methods. Economic analyses showed that the use of advanced methods is cost-effective when success rates with traditional methods are less than 70 to 90 percent. Finally, with the focus of GRWP activities shifting to Ghana's northern regions, new challenges in drilling success rates are being encountered. In certain districts, success rates as low as 35 percent are observed, raising questions about the efficacy of existing well-siting strategies in the current physical setting, and the validity of traditional cost-benefit analyses for assessing the economic aspects of water exploration in drought-stricken areas.
25 CFR 226.32 - Well records and reports.
Code of Federal Regulations, 2011 CFR
2011-04-01
... keep accurate and complete records of the drilling, redrilling, deepening, repairing, treating... cement record of casing used in drilling each well; the record of drill-stem and other bottom hole... producing reservoir and to obtain information concerning formations drilled, and shall furnish reports...
NASA Astrophysics Data System (ADS)
Elders, W. A.; Nielson, D.; Schiffman, P.; Schriener, A., Jr.
2014-12-01
Scientists, engineers, and policy makers gathered at a workshop in the San Bernardino Mountains of southern California in October 2013 to discuss the science and technology involved in developing high-enthalpy geothermal fields. A typical high-enthalpy geothermal well between 2000 and 3000 m deep produces a mixture of hot water and steam at 200-300 °C that can be used to generate about 5-10 MWe of electric power. The theme of the workshop was to explore the feasibility and economic potential of increasing the power output of geothermal wells by an order of magnitude by drilling deeper to reach much higher pressures and temperatures. Development of higher enthalpy geothermal systems for power production has obvious advantages; specifically higher temperatures yield higher power outputs per well so that fewer wells are needed, leading to smaller environmental footprints for a given size of power plant. Plans for resource assessment and drilling in such higher enthalpy areas are already underway in Iceland, New Zealand, and Japan. There is considerable potential for similar developments in other countries that already have a large production of electricity from geothermal steam, such as Mexico, the Philippines, Indonesia, Italy, and the USA. However drilling deeper involves technical and economic challenges. One approach to mitigating the cost issue is to form a consortium of industry, government and academia to share the costs and broaden the scope of investigation. An excellent example of such collaboration is the Iceland Deep Drilling Project (IDDP), which is investigating the economic feasibility of producing electricity from supercritical geothermal reservoirs, and this approach could serve as model for future developments elsewhere. A planning committee was formed to explore creating a similar initiative in the USA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nix, Andrew; Johnson, Derek; Heltzel, Robert
Researchers at the Center for Alternative Fuels, Engines, and Emissions (CAFEE) completed a multi-year program under DE-FE0013689 entitled, “Assessing Fugitive Methane Emissions Impact Using Natural Gas Engines in Unconventional Resource Development.” When drilling activity was high and industry sought to lower operating costs and reduce emissions they began investing in dual fuel and dedicated natural gas engines to power unconventional well equipment. From a review of literature we determined that the prime-movers (or major fuel consumers) of unconventional well development were the service trucks (trucking), horizontal drilling rig (drilling) engines, and hydraulic stimulation pump (fracturing) engines. Based on early findingsmore » from on-road studies we assessed that conversion of prime movers to operate on natural gas could contribute to methane emissions associated with unconventional wells. As such, we collected significant in-use activity data from service trucks and in-use activity, fuel consumption, and gaseous emissions data from drilling and fracturing engines. Our findings confirmed that conversion of the prime movers to operate as dual fuel or dedicated natural gas – created an additional source of methane emissions. While some gaseous emissions were decreased from implementation of these technologies – methane and CO 2 equivalent emissions tended to increase, especially for non-road engines. The increases were highest for dual fuel engines due to methane slip from the exhaust and engine crankcase. Dedicated natural gas engines tended to have lower exhaust methane emissions but higher CO 2 emissions due to lower efficiency. Therefore, investing in currently available natural gas technologies for prime movers will increase the greenhouse gas footprint of the unconventional well development industry.« less
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
A decade of drilling developments pays off in offshore Italian oil field
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dussert, P.; Santoro, G.; Soudet, H.
1988-02-29
As the only oil field in the world producing systematically through horizontal wells, Rospo Mare, the Italian oil field in the Adriatic, is s ''first.'' Rospo Mare is an uncommon oil field because the nature of its reservoir and the characteristics of its oil prevent it from being produced through conventional vertical wells. But thanks to horizontal drilling techniques developed since 1977 by Elf Aquitaine and the Institut Francaise du Petrole (IFP), the field was producing 22,00 b/d of crude oil on Jan. 1, 1988. Of this, 19,000 b/d came from six horizontal wells and 3,000 b/d from three verticalmore » or deviated wells. For comparison, on Jan. 1, 1987, the field produced only 4,300 b/d through a single horizontal well, two vertical wells, and one deviated well. Rospo Mare is a joint venture of Elf Italiana (61.7%), the operator, and AGIP (38.3%). A description in this article of the challenge of Rospo Mare and the results to date set the stage for a series of articles in coming weeks. They will cover the state of the art in not only drilling, but horizontal completions, production, log interpretation, and other aspects of this major oil industry technology.« less
Estimating the Probability of Elevated Nitrate Concentrations in Ground Water in Washington State
Frans, Lonna M.
2008-01-01
Logistic regression was used to relate anthropogenic (manmade) and natural variables to the occurrence of elevated nitrate concentrations in ground water in Washington State. Variables that were analyzed included well depth, ground-water recharge rate, precipitation, population density, fertilizer application amounts, soil characteristics, hydrogeomorphic regions, and land-use types. Two models were developed: one with and one without the hydrogeomorphic regions variable. The variables in both models that best explained the occurrence of elevated nitrate concentrations (defined as concentrations of nitrite plus nitrate as nitrogen greater than 2 milligrams per liter) were the percentage of agricultural land use in a 4-kilometer radius of a well, population density, precipitation, soil drainage class, and well depth. Based on the relations between these variables and measured nitrate concentrations, logistic regression models were developed to estimate the probability of nitrate concentrations in ground water exceeding 2 milligrams per liter. Maps of Washington State were produced that illustrate these estimated probabilities for wells drilled to 145 feet below land surface (median well depth) and the estimated depth to which wells would need to be drilled to have a 90-percent probability of drawing water with a nitrate concentration less than 2 milligrams per liter. Maps showing the estimated probability of elevated nitrate concentrations indicated that the agricultural regions are most at risk followed by urban areas. The estimated depths to which wells would need to be drilled to have a 90-percent probability of obtaining water with nitrate concentrations less than 2 milligrams per liter exceeded 1,000 feet in the agricultural regions; whereas, wells in urban areas generally would need to be drilled to depths in excess of 400 feet.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas C. Chidsey Jr; David E. Eby; Laura L. Wray
2003-12-01
Over 400 million barrels (64 million m{sup 3}) of oil have been produced from the shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation in the Paradox Basin, Utah and Colorado. With the exception of the giant Greater Aneth field, the other 100 plus oil fields in the basin typically contain 2 to 10 million barrels (0.3-1.6 million m{sup 3}) of original oil in place. Most of these fields are characterized by high initial production rates followed by a very short productive life (primary), and hence premature abandonment. Only 15 to 25 percent of the original oil in place ismore » recoverable during primary production from conventional vertical wells. An extensive and successful horizontal drilling program has been conducted in the giant Greater Aneth field. However, to date, only two horizontal wells have been drilled in small Ismay and Desert Creek fields. The results from these wells were disappointing due to poor understanding of the carbonate facies and diagenetic fabrics that create reservoir heterogeneity. These small fields, and similar fields in the basin, are at high risk of premature abandonment. At least 200 million barrels (31.8 million m{sup 3}) of oil will be left behind in these small fields because current development practices leave compartments of the heterogeneous reservoirs undrained. Through proper geological evaluation of the reservoirs, production may be increased by 20 to 50 percent through the drilling of low-cost single or multilateral horizontal legs from existing vertical development wells. In addition, horizontal drilling from existing wells minimizes surface disturbances and costs for field development, particularly in the environmentally sensitive areas of southeastern Utah and southwestern Colorado.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas C. Chidsey Jr; Craig D. Morgan; Kevin McClure
2003-12-01
Over 400 million barrels (64 million m{sup 3}) of oil have been produced from the shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation in the Paradox Basin, Utah and Colorado. With the exception of the giant Greater Aneth field, the other 100 plus oil fields in the basin typically contain 2 to 10 million barrels (0.3-1.6 million m{sup 3}) of original oil in place. Most of these fields are characterized by high initial production rates followed by a very short productive life (primary), and hence premature abandonment. Only 15 to 25 percent of the original oil in place ismore » recoverable during primary production from conventional vertical wells. An extensive and successful horizontal drilling program has been conducted in the giant Greater Aneth field. However, to date, only two horizontal wells have been drilled in small Ismay and Desert Creek fields. The results from these wells were disappointing due to poor understanding of the carbonate facies and diagenetic fabrics that create reservoir heterogeneity. These small fields, and similar fields in the basin, are at high risk of premature abandonment. At least 200 million barrels (31.8 million m{sup 3}) of oil will be left behind in these small fields because current development practices leave compartments of the heterogeneous reservoirs undrained. Through proper geological evaluation of the reservoirs, production may be increased by 20 to 50 percent through the drilling of low-cost single or multilateral horizontal legs from existing vertical development wells. In addition, horizontal drilling from existing wells minimizes surface disturbances and costs for field development, particularly in the environmentally sensitive areas of southeastern Utah and southwestern Colorado.« less
THIN SECTION DESCRIPTIONS: LITTLE UTE AND SLEEPING UTE FIELDS, MONTEZUMA COUNTY, COLORADO
DOE Office of Scientific and Technical Information (OSTI.GOV)
David E. Eby; Laura L. Wray
2003-12-01
Over 400 million barrels (64 million m{sup 3}) of oil have been produced from the shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation in the Paradox Basin, Utah and Colorado. With the exception of the giant Greater Aneth field, the other 100 plus oil fields in the basin typically contain 2 to 10 million barrels (0.3-1.6 million m{sup 3}) of original oil in place. Most of these fields are characterized by high initial production rates followed by a very short productive life (primary), and hence premature abandonment. Only 15 to 25 percent of the original oil in place ismore » recoverable during primary production from conventional vertical wells. An extensive and successful horizontal drilling program has been conducted in the giant Greater Aneth field in Utah (figure 1). However, to date, only two horizontal wells have been drilled in small Ismay and Desert Creek fields. The results from these wells were disappointing due to poor understanding of the carbonate facies and diagenetic fabrics that create reservoir heterogeneity. These small fields, and similar fields in the basin, are at high risk of premature abandonment. At least 200 million barrels (31.8 million m{sup 3}) of oil will be left behind in these small fields because current development practices leave compartments of the heterogeneous reservoirs undrained. Through proper geological evaluation of the reservoirs, production may be increased by 20 to 50 percent through the drilling of low-cost single or multilateral horizontal legs from existing vertical development wells. In addition, horizontal drilling from existing wells minimizes surface disturbances and costs for field development, particularly in the environmentally sensitive areas of southeastern Utah and southwestern Colorado.« less
Head-target tracking control of well drilling
NASA Astrophysics Data System (ADS)
Agzamov, Z. V.
2018-05-01
The method of directional drilling trajectory control for oil and gas wells using predictive models is considered in the paper. The developed method does not apply optimization and therefore there is no need for the high-performance computing. Nevertheless, it allows following the well-plan with high precision taking into account process input saturation. Controller output is calculated both from the present target reference point of the well-plan and from well trajectory prediction with using the analytical model. This method allows following a well-plan not only on angular, but also on the Cartesian coordinates. Simulation of the control system has confirmed the high precision and operation performance with a wide range of random disturbance action.
Water Resources Management for Shale Energy Development
NASA Astrophysics Data System (ADS)
Yoxtheimer, D.
2015-12-01
The increase in the exploration and extraction of hydrocarbons, especially natural gas, from shale formations has been facilitated by advents in horizontal drilling and hydraulic fracturing technologies. Shale energy resources are very promising as an abundant energy source, though environmental challenges exist with their development, including potential adverse impacts to water quality. The well drilling and construction process itself has the potential to impact groundwater quality, however if proper protocols are followed and well integrity is established then impacts such as methane migration or drilling fluids releases can be minimized. Once a shale well has been drilled and hydraulically fractured, approximately 10-50% of the volume of injected fluids (flowback fluids) may flow out of the well initially with continued generation of fluids (produced fluids) throughout the well's productive life. Produced fluid TDS concentrations often exceed 200,000 mg/L, with elevated levels of strontium (Sr), bromide (Br), sodium (Na), calcium (Ca), barium (Ba), chloride (Cl), radionuclides originating from the shale formation as well as fracturing additives. Storing, managing and properly disposisng of these fluids is critical to ensure water resources are not impacted by unintended releases. The most recent data in Pennsylvania suggests an estimated 85% of the produced fluids were being recycled for hydraulic fracturing operations, while many other states reuse less than 50% of these fluids and rely moreso on underground injection wells for disposal. Over the last few years there has been a shift to reuse more produced fluids during well fracturing operations in shale plays around the U.S., which has a combination of economic, regulatory, environmental, and technological drivers. The reuse of water is cost-competitive with sourcing of fresh water and disposal of flowback, especially when considering the costs of advanced treatment to or disposal well injection and lessens the use of fresh water and disposal needs thus is a major innovation for the industry. Proper water resource managment techniques from the begining of drilling through production are critical to ensure the energy necessary for society is produced while also protecting the environment.
No vintage year ahead, but it will be better than '89
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garb, F.A.
1989-12-01
Activities in the upstream petroleum industry react to prices received for hydrocarbons and related products. Prices, in turn, are the result of supply, demand, politics and emotions. The author presents a forecast of 1990 oil industry activities and reviews the status of the pressures establishing oil and gas. According to this analysis, 1990 should be the first of a series of transition years. Oil and gas prices should be more stable than in the past. It will not be good drilling year, but will not be as bad as 1989. Gas exploration will again dominate exploration drilling. Development drilling willmore » account for more wells, if not for more budget dollars than exploration, with horizontal drilling developments being monitored closely industry-wide. Consolidation of mature producing properties into independent oil companies will continue. Decline in domestic production and an increase in hydrocarbon use and in imports should continue.« less
30 CFR 250.410 - How do I obtain approval to drill a well?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false How do I obtain approval to drill a well? 250..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.410 How do I obtain approval to drill a...
25 CFR 226.25 - Gas well drilled by oil lessees and vice versa.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Gas well drilled by oil lessees and vice versa. 226.25... OSAGE RESERVATION LANDS FOR OIL AND GAS MINING Operations § 226.25 Gas well drilled by oil lessees and vice versa. Prior to drilling, the oil or gas lessee shall notify the other lessees of his/her intent...
25 CFR 226.25 - Gas well drilled by oil lessees and vice versa.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Gas well drilled by oil lessees and vice versa. 226.25... OSAGE RESERVATION LANDS FOR OIL AND GAS MINING Operations § 226.25 Gas well drilled by oil lessees and vice versa. Prior to drilling, the oil or gas lessee shall notify the other lessees of his/her intent...
25 CFR 226.25 - Gas well drilled by oil lessees and vice versa.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Gas well drilled by oil lessees and vice versa. 226.25... OSAGE RESERVATION LANDS FOR OIL AND GAS MINING Operations § 226.25 Gas well drilled by oil lessees and vice versa. Prior to drilling, the oil or gas lessee shall notify the other lessees of his/her intent...
25 CFR 226.25 - Gas well drilled by oil lessees and vice versa.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Gas well drilled by oil lessees and vice versa. 226.25... OSAGE RESERVATION LANDS FOR OIL AND GAS MINING Operations § 226.25 Gas well drilled by oil lessees and vice versa. Prior to drilling, the oil or gas lessee shall notify the other lessees of his/her intent...
25 CFR 226.25 - Gas well drilled by oil lessees and vice versa.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Gas well drilled by oil lessees and vice versa. 226.25... OSAGE RESERVATION LANDS FOR OIL AND GAS MINING Operations § 226.25 Gas well drilled by oil lessees and vice versa. Prior to drilling, the oil or gas lessee shall notify the other lessees of his/her intent...
PREFACE: Scientific and Technical Challenges in the Well Drilling Progress
NASA Astrophysics Data System (ADS)
2015-02-01
The Conference "Advanced Engineering Problems in Drilling" was devoted to the 60th anniversary of the Drilling Department, Institute of Natural Resources. Today this Department is the "descendant" of two existing departments - Mining Exploration Technology and Oil and Gas Drilling. It should be mentioned that this remarkable date is associated with the first graduation class of mining engineers in "Mining Exploration Technologies", as well as the 30th anniversary of the Oil and Gas Well Drilling Department. Anniversary is an excellent occasion to remember one's historical past. At the beginning of the last century within the Tomsk Technological Institute n.a. Emperor Nikolai II the Mining Department was established which soon embraced the Obruchev-Usov Mining-Geological School. This School became the parent of mining-geological education in the Asian region of Russia, as well as the successor of mining-geological science. It was and is today one of the leading schools in the spheres of mineral resources exploration, surveying and mining. 1927 is the year of the establishment of the Department of Technology in Mineral Exploration. SibGeokom (Western-Siberia branch of the Geological Committee) under the supervision of M.A. Usov obtained the first Krelis rotary boring drill. Prior to that only the Keystone cable drilling rig was used in exploration. It was I.A. Molchanov who was responsible for the development and implementation of new technology in the field of exploration. In the yard of SibGeokom (now it is Building № 6, Usov St.) the first drilling rig was mounted. This was the beginning of the first training courses for Krelis drilling foremen under the supervision of I.A. Molchanov. In 1931 I.A. Molchanov headed the Department of Exploration which was located in Building № 6. In the outside territory of this building a drilling site was launched, including Keystone cable drilling rig, CAM-500 drilling rig and others. In the Building itself, i.e. in one study room (now № 107), the floor was lowered to 2 m and a drilling rig was mounted where students could obtain practical skills in drilling. The Department of Exploration became the foundation of the future department of Mining Exploration Technologies. However, the Department of Exploration, headed by A.A. Belitshky from 1944, furthered its work in the research sphere of drilling (including such leading specialists as P.F. Palyanov, V.I. Molchanov, I.S. Mitushkin, V.M. Matrosov, V.P. Krendelev) and in 1949 a new speciality was introduced "Technologies in Mineral Exploration." In 1952 the graduate of Moscow Geological Institute (now Geological Institute, Russian Academy of Science) PhD. S.S. Sulakshin began working in this Department, and in 1954 headed the newly established Department of Technologies in Mineral Exploration and was its continuous Head for more than 32 years and during the last 60 years has been a close associate of this department. Due to his brilliant supervision, this Department flourished and during the last 20 years has been one of the top departments in Russian affliated departments. In 1962 within the framework of this Department a new speciality was introduced - Oil and Gas Well Drilling. 125 full-time and 50 part-time students were enrolled in the two above-mentioned specialities. As a result, there was a necessity to open a new independent department which was in 1984 (October 1). The Department of Oil and Gas Well Drilling was located in Building № 8 and then in Building № 15. The Department staff included graduates of the Department of Technologies in Mineral Exploration and was headed by Yu. L. Boyarko, one of the first graduates of this Department. Time passed by and life made its own adjustments which influenced the further existence of these two departments. Due to the decrease of exploration and development drilling scope the student enrollment in the two above-mentioned specialties also decreased many-fold. As a result the two departments - Technologies in Mineral Exploration and Technologies in Mineral Exploration were merged into one department. In 2003 the newly merged Department of Drilling was established within the Institute of Petroleum Engineering, now the Institute of Natural Resources and is located in Building № 6 where it began its life. During these 60 years more than 3000 specialists have graduated the Department of Drilling, many whom are highly-qualified and dedicated professionals. There is no doubt that this Conference involved comprehensive advanced engineering problems in drilling and issues on relevant personnel training. It is extremely important to understand how the 60-year progress and contribution in the field of drilling has left its trace in the history of this Department; and, that, now, it is necessary to move further and seek new and new horizons in drilling.
NASA Technical Reports Server (NTRS)
1994-01-01
C Language Integrated Production System (CLIPS), a NASA-developed software shell for developing expert systems, has been embedded in a PC-based expert system for training oil rig personnel in monitoring oil drilling. Oil drilling rigs if not properly maintained for possible blowouts pose hazards to human life, property and the environment may be destroyed. CLIPS is designed to permit the delivery of artificial intelligence on computer. A collection of rules is set up and, as facts become known, these rules are applied. In the Well Site Advisor, CLIPS provides the capability to accurately process, predict and interpret well data in a real time mode. CLIPS was provided to INTEQ by COSMIC.
GOS hook type wells, directional planning, techniques applied and problems encountered
DOE Office of Scientific and Technical Information (OSTI.GOV)
A /Azim, M.; Fahmy, H.; Salem, A.
1995-10-01
This paper addresses the various aspects of hook type wells introduced and drilled within GUPCO operations during he last two years. The first well of this category was October-G10, drilled in October 1992 from October ``G`` platform to a target point in the Nubia formation. Several wells of the same type have been drilled through 1993 and 1994. This group includes October-H1, Ramadan 3-57, July 62-69 and SB 374-3. Drilling hook type well profiles has resulted in increased production and more reserve recovery. The driving force behind using this profile was the reservoir requirements where it was required to hitmore » a target within few meters at a certain angle and direction. Torque and drag models have been used to optimize well path planning, resulting in lower torque and drag values. Daily pot appraisal of the drilling operations to monitor hole cleaning effectiveness. Combination of advanced steerable systems and PDC bits enabled GUPCO to drill these wells cost effectively.« less
30 CFR 250.462 - What are the requirements for well-control drills?
Code of Federal Regulations, 2014 CFR
2014-07-01
... drills? 250.462 Section 250.462 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Other Drilling Requirements § 250.462 What are the requirements for well...
30 CFR 250.462 - What are the requirements for well-control drills?
Code of Federal Regulations, 2012 CFR
2012-07-01
... drills? 250.462 Section 250.462 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Other Drilling Requirements § 250.462 What are the requirements for well...
30 CFR 250.462 - What are the requirements for well-control drills?
Code of Federal Regulations, 2013 CFR
2013-07-01
... drills? 250.462 Section 250.462 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Other Drilling Requirements § 250.462 What are the requirements for well...
30 CFR 250.1612 - Well-control drills.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Well-control drills. 250.1612 Section 250.1612 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1612 Well-control drills. Well-control...
Results of exploratory drilling at Point MacKenzie, Alaska, 1981
Patrick, Leslie
1981-01-01
The Matanuska-Susitna Borough anticipates industrial development near Point MacKenzie, Alaska. Because little hydrologic information is available for the area, the Borough contracted for the drilling of two test wells. It was found that: Both wells penetrated unconsolidated stratified clay, silt, sand, and gravel; each well penetrated a shallow unconfined and deeper confined aquifers; the water levels in the wells rise and fall with the tide; the chemical analyses indicate that the water quality meets the Alaska Drinking Water Standards, except for slightly high levels of manganese and pH; and the potential for saltwater intrusion should be evaluated as part of future studies. (USGS)
Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lum, Clinton C. L.
This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less
Regional resource depletion and industry activity: The case of oil and gas in the Gulf of Mexico
Attanasi, E.D.
1986-01-01
Stable and declining oil and gas prices have changed the industry's price expectations and, along with depletion of promising exploration prospects, has resulted in reduced exploration. Even with intensive additional exploration, production in most U.S. areas is expected to decline. What does this imply for the drilling and petroleum industry suppliers in particular regions? How should planners in government and the private sector project and incorporate the consequences of these changes in their strategies? This paper answers these questions for the industry operating in the offshore Gulf of Mexico. Future oil and gas production, as well as demand for offshore drilling and production facilities, are shown to depend on the size distribution of undiscovered fields, their associated production costs, and oil and gas prices. Declining well productivity is a consequence of development of progressively smaller fields so that long-run drilling demand should not decline in proportion to the expected production decline. Calculations show a substantial payoff to the drilling industry, in terms of potential demand increases, if it can develop and implement cost reducing technologies. Implications of these results for other offshore producing areas such as the North Sea are also discussed. ?? 1986.
Cold laser technique for cell surgery
NASA Astrophysics Data System (ADS)
Palanker, Daniel V.; Ohad, Shoshanit; Lewis, Aaron; Laufer, Neri
1992-08-01
A new cell surgery technique has been developed to produce well-defined alterations in cells and tissues without detectable heating and/or other structural damage in the surroundings. The technique involves the use of a 193 nm argon fluoride excimer laser which is guided through a glass pipette filled with a positive air pressure. To demonstrate the method holes were drilled in the zona pellucida of mouse oocytes. The diameter of the drilled hole was determined by the pipette tip size, and its depth by an energy emitted per pulse and number of pulses. Scanning electron microscopy of the drilled mouse oocytes showed uniform, round, well circumscribed holes with sharp edges. Oocytes that had their zona pellucida drilled with this new method fertilized in vitro and developed to the blastocyst stage in a rate similar to that of control group. These results demonstrate the non-perturbing nature of this cold laser microsurgical procedure. In addition to the extension of our results for clinical in vitro fertilization purposes, such as enhancement of fertilization and embryo biopsy, there are wide ranging possible uses of our method in fundamental and applied investigations that require sub-micron accuracy in cellular alteration.
Dillon, William P.
1981-01-01
This report summarizes our general knowledge of the geology and petroleum potential, as well as potential problems and hazards associated with development of petroleum resources, of the area proposed for nominations for lease sale number 78. This area includes the U.S. eastern continental margin from the mouth of Chesapeake Bay to approximately Cape Canaveral, Florida, including the upper Continental Slope and inner Blake Plateau. The area for possible sales and the previous areas leased are shown in figure 1; physiographic features of the region are shown in figure 2. Six exploration wells have been drilled within the proposed lease area (figs. 3 and 4) but no commercial discoveries have been made. All six wells were drilled on the Continental Shelf in the Southeast Georgia Embayment. No commercial production has been obtained onshore in the region. The areas already drilled have thin sedimentary sections, and the deeper rocks are dominantly continental facies. Petroleum formation may have been hindered by a lack of organic material and sufficient burial for thermal maturation. Analysis of drill and seismic profiling data presented here, however, indicates that a much thicker sedimentary rock section containing a much higher proportion of marine deposits exists seaward of the exploratory wells on the Continental Shelf. These geologic conditions imply that the offshore basins may be more favorable environments for generating petroleum.
A field conference on Impacts of coalbed methane development in the Powder River basin, Wyoming
Flores, Romeo M.; Stricker, Gary D.; Meyer, Joseph F.; Doll, Thomas E.; Norton, Pierce H.; Livingston, Robert J.; Jennings, M. Craig; Kinney, Scott; Mitchell, Heather; Dunn, Steve
2001-01-01
Coalbed methane (CBM) development from the Paleocene Fort Union Formation coal beds in the Powder River Basin in Wyoming has been rapidly expanding since 1993. During the past ten years the number of CBM producing wells rose to about 4,000 wells as of October, 2000. About 3,500 of these wells were completed since 1998. About 13-14 percent of these CBM wells are on Federal lands while the majority are on State and private lands. More than 50 percent of the lands in the Powder River Basin contains mineral rights owned by the Federal government. CBM development on Federal lands creates impacts in the basin resulting from associated drilling, facilities, gas gathering systems (e.g., pipeline networks), access roads, and withdrawal and disposal of co-produced water from CBM wells. The Bureau of Land Management (BLM) assesses the land-use management and impacts of drilling CBM wells on lands where mineral rights are controlled by the Federal government.
Seismic While Drilling Case Study in Shengli Oilfield, Eastern China
NASA Astrophysics Data System (ADS)
Wang, L.; Liu, H.; Tong, S.; Zou, Z.
2015-12-01
Seismic while drilling (SWD) is a promising borehole seismic technique with reduction of drilling risk, cost savings and increased efficiency. To evaluate the technical and economic benefits of this new technique, we carried out SWD survey at well G130 in Shengli Oilfield of Eastern China. Well G130 is an evaluation well, located in Dongying depression at depth more than 3500m. We used an array of portable seismometers to record the surface SWD-data, during the whole drilling progress. The pilot signal was being recorded continuously, by an accelerometer mounted on the top of the drill string. There were also two seismometers buried in the drill yard, one near diesel engine and another near derrick. All the data was being recorded continuously. According to mud logging data, we have processed and analyzed all the data. It demonstrates the drill yard noise is the primary noise among the whole surface wavefield and its dominant frequency is about 20Hz. Crosscorrelation of surface signal with the pilot signal shows its SNR is severely low and there is no any obvious event of drill-bit signals. Fortunately, the autocorrelation of the pilot signal shows clear BHA multiple and drill string multiple. The period of drill string multiple can be used for establishing the reference time (so-called zero time). We identified and removed different noises from the surface SWD-data, taking advantages of wavefield analysis. The drill-bit signal was retrieved from surface SWD-data, using seismic interferometry. And a reverse vertical seismic profile (RVSP) data set for the continuous drilling depth was established. The subsurface images derived from these data compare well with the corresponding images of 3D surface seismic survey cross the well.
NASA Astrophysics Data System (ADS)
Sun, Youhong; Gao, Ke; Yu, Ping; Liu, Baochang; Guo, Wei; Ma, Yinlong; Yang, Yang
2014-05-01
SK-2 Well is located in DaQing city,where is site of the largest oil field in China,Heilongjiang province, north-east of China.The objective of SK-2 well is to obtain full cores of cretaceous formation in Song Liao basin,and to build the time tunnel of Cretaceous greenhouse climate change,and to clarify the causes,processes and results of the formations of DaQing oil field. This will ensure to achieve our ultimate goals,to test the CRUST-1 drilling rig and improve China's deep scientific drilling technology,to form the scientific drilling technology,method and system with independent intellectual property rights,and to provide technical knowledge and information for China's ten kilometers super-deep scientific drilling technical resources.SK-2 Well is at 6400 meter depth, where the drilling inclination is 90 degree and the continuous coring length is 3535 meter that from 2865 to 6400 meter,the recovery rate of the core is greater or equal to 95 percent with 100 millimeters core diameter and 3.9 degree per 100 meter geothermal gradient.The CRUST-1 rig is designated with special drilling equipment for continental scientific drilling combined to the oil drilling equipment ability with advanced geological drilling technology which is highly automatic and intelligent. CRUST-1 drilling ability is 10000 meter with the maximum hook load 700 tons, the total power is 4610 Kilowatt.CRUST-1 will be integrated with a complete set of automation equipment,including big torque hydraulic top drive,high accuracy automatic drilling rod feeding system, suspended automatic drill string discharge device,hydraulic intelligent iron roughneck,and hydraulic automatic catwalk to fully meet the drilling process requirements of SK-2.Designed with advanced drilling technique for 260 degree in the bottom of SK-2 well and hard rock,including the drilling tools of high temperature hydraulic hammer,high temperature resistance and high strength aluminum drill pipe,high temperature preparation of mud treatment and high temperature resistant cementing materials, and bionic bits,that is coupling bionic PDC tooth bit and diamond-impregnated bit for hard rock.All parts of CRUST-1 were successfully assembled along with the derrick and base lift and transported about 3456 kilometers from manufacture,GuangHan city in southwest China's Sichuan province,to the well site of SK-2 in end of 2013.SK-2 will be finished during next 4 years.
Wireline Deep Drill for the Exploration of Icy Bodies
NASA Technical Reports Server (NTRS)
Paulsen, G.; Zacny, K.; Mellerowicz, B.; Craft, J.; Bar-Cohen, Y.; Beegle, L.; Sherrit, S.; Badescu, M.; Corsetti, F.; Ibarra, Y.
2013-01-01
One of the most pressing current questions in space science is whether life has ever arisen anywhere else in the universe. Water is a critical prerequisite for all life-as-we-know-it, thus the possible exploration targets for extraterrestrial life are bodies that have or had copious liquid: Mars, Europa, and Enceladus. Due to the oxidizing nature of Mars' surface, as well as subsurface liquid water reservoirs present on Europa and Enceladus, the search for evidence of existing life must likely focus on subsurface locations, at depths sufficient to support liquid water or retain biologic signatures. To address these questions, an Auto-Gopher sampler has been developed that is a wireline type drill. This drill is suspended on a tether and its motors and mechanisms are built into a tube that ends with a coring bit. The tether provides the mechanical connection to a rover/lander on a surface as well as power and data communication. Upon penetrating to a target depth, the drill is retracted from the borehole, the core is deposited into a sample transfer system, and the drill is lowered back into the hole. Wireline operation sidesteps one of the major drawbacks of traditional continuous drill string systems by obviating the need for multiple drill sections, which add significantly to the mass and the complexity of the system (i.e. penetration rate was 40 cm per hour). Drilling to 2 meter depth and recovering of cores every 10 cm took a total time of 15 hours (a single step of drilling 10 cm and retrieving the core was 45 minutes). Total energy to reach the 2 m depth was 500 Whr. The Weight on Bit was limited to less than 70 Newton. The core recovery was 100%.
Garden Banks 388 subsea drilling/production template: Project management of a fast-track project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ledbetter, W.R.
1995-10-01
Enserch Exploration`s Garden Banks 388 development is a production scheme based around a floating drilling and production facility and subsea drilling/production template. The Floating Production Facility (FPF) is a converted semisubmersible drilling rig which will drill and product through a 24-well slot template. This development is located in Block 388 of the Garden Banks area in the Gulf of Mexico approximately 200 miles southwest of New Orleans. Louisiana. This production system is being installed in an area of known oil and gas reserves and will produce to a shallow water platform 54 miles away at Ewing Bank 315. The FPFmore » will be permanently moored on the surface above the template. The subsea template has been installed in 2,190 feet of water and will produce through a 2,000 foot free-standing production riser system to the FPF. The produced fluids are partially separated on the FPF before oil and gas are pumped through the template to export gathering lines which are connected to the shallow water facility.« less
Currie, D R; Isaacs, Leanne R
2005-04-01
Changes to benthic infauna caused by exploratory gas drilling operations in the Minerva field were examined experimentally using a BACI (before, after, control, impact) design. Analysis of 72 x 0.1 m2 Smith-McIntyre grab samples obtained from one pre-drilling and three post-drilling periods yielded a diverse fauna consisting of 196 invertebrate species and 5035 individuals. Changes to benthic community structure were assessed using ANOVA and nonmetric multidimensional scaling (MDS). The abundances of two common species (Apseudes sp. 1 and Prionospio coorilla) decreased significantly at the well-head site immediately after drilling. The size of these reductions in abundance ranged between 71% and 88%, and persisted for less than 4 months after drilling. A third common species (Katlysia sp. 1) increased in abundance 200 m east of the well-head following drilling. Most species occurred at densities too low to be analysed individually and so were pooled at higher taxonomic levels. Changes in the abundance of species aggregated by phylum varied, but significant declines in the most abundant phyla (Crustaceans and Polychaetes) of 45-73% were observed at all sites within a 100 m radius of the well-head following drilling. In most cases these changes became undetectable four months after drilling following species recruitments. MDS ordinations confirm that drilling related changes to benthic community structure are most pronounced at stations located closest to the well-head. Additionally, the ordinations indicate that modified communities persist at the well-head for more than 11 months following exploratory drilling.
NASA Astrophysics Data System (ADS)
Amirov, Elnur
2017-04-01
Sperry Drilling Services' PWD sensor improve and support drilling efficiency by providing very important, real-time downhole pressure information that allows to make faster and better drilling decisions. The PWD service, provides accurate annular pressure, internal pressure and temperature measurements using any of well-known telemetry systems: positive mud pulse, negative mud pulse and electromagnetic. Pressure data can be transmitted in real time and recorded in downhole memory. In the pumpsoff mode, the minimum, maximum and average pressures observed during the non-circulating period are transmitted via mud pulse telemetry when circulation recommences. These measurements provide the knowledge to avoid lost circulation and detect flow/kicks before they happen. The PWD sensor also reduces the risk of problems related by unexpected fracture or collapse. Sperry's PWD sensor also helps to avoid lost circulation and flow/kick, which can lead to costly delays in drilling. Annular pressure increases often reflect ineffective cuttings removal and poor hole cleaning, both of which can lead to lost circulation. The PWD sensor detects the increase and drilling fluid parameters and operating procedures can be modified to improve hole-cleaning efficiency. On extended reach wells, real-time information helps to maintain wellbore pressures between safe operating limits and to monitor hole cleaning. The PWD sensor also provides early detection of well flows and kicks. A drop in pressure, can indicate gas, oil and water kicks. Because the sensor is making its measurement downhole, the PWD sensor makes it possible to detect such pressure drops earlier than more traditional surface measurements. The PWD sensor has high-accuracy quartz gauges and is able to record data because of its battery-powered operation. It is also extremely useful in specialized drilling environments, such as high-pressure/high-temperature, extended-reach and deepwater wells. When combined with the rig management system, surface and downhole measurements, can be compared for more accurate and extensive analysis. PWD sensor was utilized with encouraging results in many wells up to 3000-6000m subsurface reservoirs (these wells were drilled in the Khazar-Caspian region of the Azerbaijan Republic) and acquired PWD RT/RM data implemented for best drilling practices in other brand new drilled offset wells in order to help us achieve our mission to drill safe, faster, on target, optimize drilling efficiency, maximize well value and reservoir insight.
Remote sensing and GIS approach for water-well site selection, southwest Iran
Rangzan, K.; Charchi, A.; Abshirini, E.; Dinger, J.
2008-01-01
The Pabdeh-Lali Anticline of northern Khuzestan province is located in southwestern Iran and occupies 790 km2. This structure is situated in the Zagros folded belt. As a result of well-developed karst systems in the anticlinal axis, the water supply potential is high and is drained by many peripheral springs. However, there is a scarcity of water for agriculture and population centers on the anticlinal flanks, which imposes a severe problem in terms of area development. This study combines remotely sensed (RS) data and a geographical information system (GIS) into a RSGIS technique to delineate new areas for groundwater development and specific sites for drilling productive water wells. Toward these goals, RS data were used to develop GIS layers for lithology, structural geology, topographic slope, elevation, and drainage density. Field measurements were made to create spring-location and groundwater-quality GIS layers. Subsequently, expert choice and relational methods were used in a GIS environment to conjunctively analyze all layers to delineate preferable regions and 43 individual sites in which to drill water wells. Results indicate that the most preferred areas are, in preferential order, within recent alluvial deposits, the Bakhtiyari Conglomerates, and the Aghajari Sandstone. The Asmari Limestone and other units have much lower potential for groundwater supplies. Potential usefulness of the RSGIS method was indicated when six out of nine producing wells recently drilled by the Khozestan Water and Power Authority (which had no knowledge of this study) were located in areas preferentially selected by this technique.
43 CFR 3162.2-1 - Drilling and producing obligations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Drilling and producing obligations. 3162.2... Requirements for Operating Rights Owners and Operators § 3162.2-1 Drilling and producing obligations. (a) The operator, at its election, may drill and produce other wells in conformity with any system of well spacing...
43 CFR 3162.2-1 - Drilling and producing obligations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Drilling and producing obligations. 3162.2... Requirements for Operating Rights Owners and Operators § 3162.2-1 Drilling and producing obligations. (a) The operator, at its election, may drill and produce other wells in conformity with any system of well spacing...
43 CFR 3162.2-1 - Drilling and producing obligations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Drilling and producing obligations. 3162.2... Requirements for Operating Rights Owners and Operators § 3162.2-1 Drilling and producing obligations. (a) The operator, at its election, may drill and produce other wells in conformity with any system of well spacing...
43 CFR 3162.2-1 - Drilling and producing obligations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Drilling and producing obligations. 3162.2... Requirements for Operating Rights Owners and Operators § 3162.2-1 Drilling and producing obligations. (a) The operator, at its election, may drill and produce other wells in conformity with any system of well spacing...
Axially symmetrical stresses measurement in the cylindrical tube using DIC with hole-drilling
NASA Astrophysics Data System (ADS)
Ma, Yinji; Yao, Xuefeng; Zhang, Danwen
2015-03-01
In this paper, a new method combining the digital image correlation (DIC) with the hole-drilling technology to characterize the axially symmetrical stresses of the cylindrical tube is developed. First, the theoretical expressions of the axially symmetrical stresses in the cylindrical tube are derived based on the displacement or strain fields before and after hole-drilling. Second, the release of the axially symmetrical stresses for the cylindrical tube caused by hole-drilling is simulated by the finite element method (FEM), which indicates that the axially symmetrical stresses of the cylindrical tube calculated by the cylindrical solution is more accuracy than that for traditionally planar solution. Finally, both the speckle image information and the displacement field of the cylindrical tube before and after hole-drilling are extracted by combining the DIC with the hole-drilling technology, then the axially symmetrical loading induced stresses of the cylindrical tube are obtained, which agree well with the results from the strain gauge method.
El Paso County Geothermal Project at Fort Bliss. Final Project Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lear, Jon; Bennett, Carlon; Lear, Dan
The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator -more » Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, D.M.; Huffmyer, W.A.; Greener, J.M.
This paper describes the geoscience and engineering aspects of the Opon Gas Field located in the Middle Magdalena Basin, Colombia. The remoteness and extreme downhole conditions make the drilling, completion, testing and geoscience interpretation of the two most recent Opon wells technically very challenging. Multiple faults, steep dips, rugged topography, a sensitive jungle environment and variable surface velocities complicate field definition. A full assessment of the commercial potential of the reservoir requires additional development drilling. Now in the early development stages, the Opon Gas Field has first production scheduled for late 1996.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barker, Ben; Moore, Joe; Segall, Marylin
The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration datamore » sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before the well was cased.« less
Gates, Andrew R.; Jones, Daniel O. B.
2012-01-01
Recovery from disturbance in deep water is poorly understood, but as anthropogenic impacts increase in deeper water it is important to quantify the process. Exploratory hydrocarbon drilling causes physical disturbance, smothering the seabed near the well. Video transects obtained by remotely operated vehicles were used to assess the change in invertebrate megafaunal density and diversity caused by drilling a well at 380 m depth in the Norwegian Sea in 2006. Transects were carried out one day before drilling commenced and 27 days, 76 days, and three years later. A background survey, further from the well, was also carried out in 2009. Porifera (45% of observations) and Cnidaria (40%) dominated the megafauna. Porifera accounted for 94% of hard-substratum organisms and cnidarians (Pennatulacea) dominated on the soft sediment (78%). Twenty seven and 76 days after drilling commenced, drill cuttings were visible, extending over 100 m from the well. In this area there were low invertebrate megafaunal densities (0.08 and 0.10 individuals m−2) in comparison to pre-drill conditions (0.21 individuals m−2). Three years later the visible extent of the cuttings had reduced, reaching 60 m from the well. Within this area the megafaunal density (0.05 individuals m−2) was lower than pre-drill and reference transects (0.23 individuals m−2). There was a significant increase in total megafaunal invertebrate densities with both distance from drilling and time since drilling although no significant interaction. Beyond the visible disturbance there were similar megafaunal densities (0.14 individuals m−2) to pre-drilling and background surveys. Species richness, Shannon-Weiner diversity and multivariate techniques showed similar patterns to density. At this site the effects of exploratory drilling on megafaunal invertebrate density and diversity seem confined to the extent of the visible cuttings pile. However, elevated Barium concentration and reduced sediment grain size suggest persistence of disturbance for three years, with unclear consequences for other components of the benthic fauna. PMID:23056177
Paillet, Frederick; Duncanson, Russell
1994-01-01
The most extensive data base for fractured bedrock aquifers consists of drilling reports maintained by various state agencies. We investigated the accuracy and reliability of such reports by comparing a representative set of reports for nine wells drilled by conventional air percussion methods in granite with a suite of geophysical logs for the same wells designed to identify the depths of fractures intersecting the well bore which may have produced water during aquifer tests. Production estimates reported by the driller ranged from less than 1 to almost 10 gallons per minute. The moderate drawdowns maintained during subsequent production tests were associated with approximately the same flows as those measured when boreholes were dewatered during air percussion drilling. We believe the estimates of production during drilling and drawdown tests were similar because partial fracture zone dewatering during drilling prevented larger inflows otherwise expected from the steeper drawdowns during drilling. The fractures and fracture zones indicated on the drilling report and the amounts of water produced by these fractures during drilling generally agree with those identified from the geophysical log analysis. Most water production occurred from two fractured and weathered zones which are separated by an interval of unweathered granite. The fractures identified in the drilling reports show various depth discrepancies in comparison to the geophysical logs, which are subject to much better depth control. However, the depths of the fractures associated with water production on the drilling report are comparable to the depths of the fractures shown to be the source of water inflow in the geophysical log analysis. Other differences in the relative contribution of flow from fracture zones may by attributed to the differences between the hydraulic conditions during drilling, which represent large, prolonged drawdowns, and pumping tests, which consisted of smaller drawdowns maintained over shorter periods. We conclude that drilling reports filed by experienced well drillers contain useful information about the depth, thickness, degree of weathering, and production capacity of fracture zones supplying typical domestic water wells. The accuracy of this information could be improved if relatively simple and inexpensive geophysical well logs such as gamma, caliper, and normal resistivity logs were routinely run in conjunction with bedrock drilling projects.
Interior Department Suggests Improvements for Offshore Arctic Oil and Gas Drilling
NASA Astrophysics Data System (ADS)
Showstack, Randy
2013-03-01
Shell's "difficulties" during its 2012 program to drill offshore oil and natural gas exploration wells in the Alaskan Arctic Ocean "have raised serious questions regarding its ability to operate safely and responsibly in the challenging and unpredictable conditions offshore Alaska," according to the report "Review of Shell's 2012 Alaska Offshore Oil and Gas Exploration Program," issued by the U.S. Department of the Interior (DOI) on 8 March. Noting the company's lack of adequate preparation for drilling in the Arctic, its failure to deploy a specialized Arctic Containment System, and the grounding of the Kulluk drilling rig near Kodiak Island last December, the report recommends that Shell develop a comprehensive and integrated plan describing its future drilling program and related operations and that it commission a third-party audit of its management systems, including its safety and environmental management systems program.
Oilfield reclamation in mixed grass prairie restores nematode but not plant communities
USDA-ARS?s Scientific Manuscript database
Background/Questions/Methods: Energy development in North American grasslands involves developing oil well pads and access roads. Reclamation/revegetation is constant: interim reclaims are conducted when drilling is complete and pumping commences, and final reclamation occurs upon cessation of well ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fathi Boukadi
2011-02-05
In this report, technologies for petroleum production and exploration enhancement in deepwater and mature fields are developed through basic and applied research by: (1) Designing new fluids to efficiently drill deepwater wells that can not be cost-effectively drilled with current technologies. The new fluids will be heavy liquid foams that have low-density at shallow dept to avoid formation breakdown and high density at drilling depth to control formation pressure. The goal of this project is to provide industry with formulations of new fluids for reducing casing programs and thus well construction cost in deepwater development. (2) Studying the effects ofmore » flue gas/CO{sub 2} huff n puff on incremental oil recovery in Louisiana oilfields bearing light oil. An artificial neural network (ANN) model will be developed and used to map recovery efficiencies for candidate reservoirs in Louisiana. (3) Arriving at a quantitative understanding for the three-dimensional controlled-source electromagnetic (CSEM) geophysical response of typical Gulf of Mexico hydrocarbon reservoirs. We will seek to make available tools for the qualitative, rapid interpretation of marine CSEM signatures, and tools for efficient, three-dimensional subsurface conductivity modeling.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis; Alan Black; Homer Robertson
2006-03-01
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high rotational speeds (greater than 10,000 rpm). The work includes a feasibility of concept research effort aimed at development that will ultimately result in the ability to reliably drill ''faster and deeper'' possibly with smaller, more mobile rigs. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration (ROP) rock cutting with substantially lower inputs of energymore » and loads. The significance of the ultra-high rotary speed drilling system is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm--usually well below 5,000 rpm. This document details the progress to date on the program entitled ''Smaller Footprint Drilling System for Deep and Hard Rock Environments: Feasibility of Ultra-High-Speed Diamond Drilling'' for the period starting 1 October 2004 through 30 September 2005. Additionally, research activity from 1 October 2005 through 28 February 2006 is included in this report: (1) TerraTek reviewed applicable literature and documentation and convened a project kick-off meeting with Industry Advisors in attendance. (2) TerraTek designed and planned Phase I bench scale experiments. Some difficulties continue in obtaining ultra-high speed motors. Improvements have been made to the loading mechanism and the rotational speed monitoring instrumentation. New drill bit designs have been provided to vendors for production. A more consistent product is required to minimize the differences in bit performance. A test matrix for the final core bit testing program has been completed. (3) TerraTek is progressing through Task 3 ''Small-scale cutting performance tests''. (4) Significant testing has been performed on nine different rocks. (5) Bit balling has been observed on some rock and seems to be more pronounces at higher rotational speeds. (6) Preliminary analysis of data has been completed and indicates that decreased specific energy is required as the rotational speed increases (Task 4). This data analysis has been used to direct the efforts of the final testing for Phase I (Task 5). (7) Technology transfer (Task 6) has begun with technical presentations to the industry (see Judzis).« less
Struchtemeyer, Christopher G.; Davis, James P.; Elshahed, Mostafa S.
2011-01-01
The Barnett Shale in north central Texas contains natural gas generated by high temperatures (120 to 150°C) during the Mississippian Period (300 to 350 million years ago). In spite of the thermogenic origin of this gas, biogenic sulfide production and microbiologically induced corrosion have been observed at several natural gas wells in this formation. It was hypothesized that microorganisms in drilling muds were responsible for these deleterious effects. Here we collected drilling water and drilling mud samples from seven wells in the Barnett Shale during the drilling process. Using quantitative real-time PCR and microbial enumerations, we show that the addition of mud components to drilling water increased total bacterial numbers, as well as the numbers of culturable aerobic heterotrophs, acid producers, and sulfate reducers. The addition of sterile drilling muds to microcosms that contained drilling water stimulated sulfide production. Pyrosequencing-based phylogenetic surveys of the microbial communities in drilling waters and drilling muds showed a marked transition from typical freshwater communities to less diverse communities dominated by Firmicutes and Gammaproteobacteria. The community shifts observed reflected changes in temperature, pH, oxygen availability, and concentrations of sulfate, sulfonate, and carbon additives associated with the mud formulation process. Finally, several of the phylotypes observed in drilling muds belonged to lineages that were thought to be indigenous to marine and terrestrial fossil fuel formations. Our results suggest a possible alternative exogenous origin of such phylotypes via enrichment and introduction to oil and natural gas reservoirs during the drilling process. PMID:21602366
Struchtemeyer, Christopher G; Davis, James P; Elshahed, Mostafa S
2011-07-01
The Barnett Shale in north central Texas contains natural gas generated by high temperatures (120 to 150°C) during the Mississippian Period (300 to 350 million years ago). In spite of the thermogenic origin of this gas, biogenic sulfide production and microbiologically induced corrosion have been observed at several natural gas wells in this formation. It was hypothesized that microorganisms in drilling muds were responsible for these deleterious effects. Here we collected drilling water and drilling mud samples from seven wells in the Barnett Shale during the drilling process. Using quantitative real-time PCR and microbial enumerations, we show that the addition of mud components to drilling water increased total bacterial numbers, as well as the numbers of culturable aerobic heterotrophs, acid producers, and sulfate reducers. The addition of sterile drilling muds to microcosms that contained drilling water stimulated sulfide production. Pyrosequencing-based phylogenetic surveys of the microbial communities in drilling waters and drilling muds showed a marked transition from typical freshwater communities to less diverse communities dominated by Firmicutes and Gammaproteobacteria. The community shifts observed reflected changes in temperature, pH, oxygen availability, and concentrations of sulfate, sulfonate, and carbon additives associated with the mud formulation process. Finally, several of the phylotypes observed in drilling muds belonged to lineages that were thought to be indigenous to marine and terrestrial fossil fuel formations. Our results suggest a possible alternative exogenous origin of such phylotypes via enrichment and introduction to oil and natural gas reservoirs during the drilling process.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-23
...-AA00 Safety Zone; KULLUK, Outer Continental Shelf Mobile Offshore Drilling Unit (MODU), Beaufort Sea... on location in order to drill exploratory wells at various prospects located in the Beaufort Sea... in order to drill exploratory wells in several prospects located in the Beaufort Sea during the 2012...
Code of Federal Regulations, 2013 CFR
2013-10-01
...: (1) Geologic investigation and analysis; (2) Drilling temperature gradient wells; (3) Core drilling; (4) Geochemical or geophysical surveys; (5) Drilling production or injection wells; (6) Reservoir... lease at the end of that year unless you qualify for a drilling extension under § 3207.13. (i) Every...
Code of Federal Regulations, 2012 CFR
2012-10-01
...: (1) Geologic investigation and analysis; (2) Drilling temperature gradient wells; (3) Core drilling; (4) Geochemical or geophysical surveys; (5) Drilling production or injection wells; (6) Reservoir... lease at the end of that year unless you qualify for a drilling extension under § 3207.13. (i) Every...
Code of Federal Regulations, 2014 CFR
2014-10-01
...: (1) Geologic investigation and analysis; (2) Drilling temperature gradient wells; (3) Core drilling; (4) Geochemical or geophysical surveys; (5) Drilling production or injection wells; (6) Reservoir... lease at the end of that year unless you qualify for a drilling extension under § 3207.13. (i) Every...
Code of Federal Regulations, 2011 CFR
2011-10-01
...: (1) Geologic investigation and analysis; (2) Drilling temperature gradient wells; (3) Core drilling; (4) Geochemical or geophysical surveys; (5) Drilling production or injection wells; (6) Reservoir... lease at the end of that year unless you qualify for a drilling extension under § 3207.13. (i) Every...
30 CFR 250.402 - When and how must I secure a well?
Code of Federal Regulations, 2012 CFR
2012-07-01
... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.402 When and how must I secure a well? Whenever you interrupt drilling...) Among the events that may cause you to interrupt drilling operations are: (1) Evacuation of the drilling...
30 CFR 250.402 - When and how must I secure a well?
Code of Federal Regulations, 2013 CFR
2013-07-01
... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.402 When and how must I secure a well? Whenever you interrupt drilling...) Among the events that may cause you to interrupt drilling operations are: (1) Evacuation of the drilling...
30 CFR 250.402 - When and how must I secure a well?
Code of Federal Regulations, 2014 CFR
2014-07-01
... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.402 When and how must I secure a well? Whenever you interrupt drilling...) Among the events that may cause you to interrupt drilling operations are: (1) Evacuation of the drilling...
Analysis of pressure buildups taken from fluid level data - Tyler sands, central Montana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bishop, D.F.
Pressure buildups taken by fluid level recording prove to be quite usable for formation evaluation in the Tyler sands of central Montana. This method provides low cost information with surprising accuracy. The procedures followed in obtaining the data, and the precautions taken in assuring the validity of the data are discussed. The data proved sufficiently accurate to perform engineering calculations in 2 separate Tyler fields. The calculations aided in determination of reservoir parameters, and in one field provided justification for additional development drilling. In another field, the data substantiated the limited reservoir, and development drilling plans were cancelled. The buildupmore » curves illustrated well-bore damage in some of the wells and subsequent stimulation of 2 wells resulted in sustained 6-fold and 9-fold increases in producing rates of these wells.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gustavson, T.C.
1979-01-01
Results are presented of a study to determine the acoustical noise distribution and impacts of the geothermal/geopressure well drilling operation near Chocolate Bayou in South Texas. Detailed noise survey data were included in a part of the study for computer simulations to develop representative and worst-case drilling operation noise predictions. Also conducted were baseline noise measurements throughout the Peterson Landing residential area. (MHT)
NASA Astrophysics Data System (ADS)
Tobin, H. J.; Hirose, T.; Saffer, D. M.; Toczko, S.; Maeda, L.
2014-12-01
International Ocean Discovery Program (IODP) Expedition 348, the latest advance of the NanTroSEIZE project, started on 13 September 2013 and was completed on 29 January 2014. During Expedition 348, the drilling vessel Chikyu advanced the ultra-deep riser hole at Site C0002, located 80 km offshore of the Kii Peninsula, from a depth of 860 meters below sea floor (mbsf) to 3058.5 mbsf, the world record for the deepest scientific ocean drilling, and cased it for future deepening. The drilling operation successfully obtained data on formation physical properties from logging while drilling (LWD) tools, as well as from lithological analyses of cuttings and core from the interior of the active accretionary prism at the Nankai Trough. IODP Site C0002 is the currently only borehole to access the deep interior of an active convergent margin. Preliminary scientific results of Expedition 348 are as follows: (1) Fine-grained turbiditic mudstones with coarser silty and sandy interbeds, exhibiting steep dips (between ~60 and 90 degrees) are predominant in the prism down to ~3000 mbsf. The biostratigraphic age of the sediments in the lowermost part of the hole is thought to be 9-11 Ma, with an assumed age of accretion of 3-5 Ma. (2) Slickenlined surfaces, deformation bands and mineral veins are present throughout the drilled interval, while well-developed scaly clay fabrics are increasingly observed below ~2200 mbsf. A substantial fault zone with well-developed foliation was successfully cored from the deep interior of the prism at ~2205 mbsf. (3) Porosity generally decreases from ~60% to ~20% from the seafloor to 3000 mbsf. However, physical properties including grain density, electrical conductivity and P-wave velocity suggest fairly homogeneous properties in the interior of the prism between ~2000 and 3000 mbsf. (4) Mud gas analysis during the riser drilling indicates that a source of methane gas shifts from microbial origin to thermogenic at around 2325 mbsf. (5) The maximum horizontal principal stress at ~2200 mbsf is in the NE-SW direction. The inner wedge at ~ 2000 mbsf is currently in a strike-slip stress regime.
NASA Astrophysics Data System (ADS)
Wenning, Quinn; Almquist, Bjarne; Ask, Maria; Schmitt, Douglas R.; Zappone, Alba
2015-04-01
The Caledonian orogeny, preserved in Scandinavia and Greenland, began with the closure of the Iapetus Ocean and culminated in the collision of Baltica and Laurentia cratons during the middle Paleozoic. The COSC scientific drilling project aims at understanding the crustal structure and composition of the Scandinavian Caledonides. The first well of the dual phase drilling program, completed in Summer of 2014, drilled through ~2.5 km of the Seve Nappe Complex near the town of Åre, Sweden. Newly acquired drill core and borehole logs provide fresh core material for physical rock property measurements and in-situ stress determination. This contribution presents preliminary data on compressional and shear wave ultrasonic velocities (Vp, Vs) determined from laboratory measurements on drill cores, together with in-situ stress orientation analysis using image logs from the first borehole of the Collisional Orogeny in the Scandinavian Caledonides project (COSC-1). An hydrostatically oil pressurized apparatus is used to test the ultrasonic Vp and Vs on three orthogonally cut samples of amphibolite, calcium bearing and felsic gneiss, meta-gabbro, and mylonitic schist from drill core. We measure directional anisotropy variability for each lithology using one sample cut perpendicular to the foliation and two additional plugs cut parallel to the foliation with one parallel to the lineation and the other perpendicular. Measurements are performed using the pulse transmission technique on samples subjected to hydrostatic pressure from 1-350 MPa at dry conditions. We present preliminary results relating Vp and Vs anisotropy to geologic units and degree of deformation. Additionally, we use acoustic borehole televiewer logs to estimate the horizontal stress orientation making use of well developed techniques for observed borehole breakouts (compressive failure) and drilling induced fractures (tensile failure). Preliminary observations show that very few drilling-induced tensile fractures are produced, and that borehole breakouts are episodic and suggests a NE-SW minimum horizontal stress direction
Geothermal drilling in Cerro Prieto
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dominguez A., Bernardo
The number of characteristics of the different wells that have been drilled in the Cerro Prieto geothermal field to date enable one to summarize the basic factors in the applied technology, draw some conclusions, improve systems and procedures, and define some problems that have not yet been satisfactorily solved, although the existing solution is the best now available. For all practical purposes, the 100 wells drilled in the three areas or blocks into which the Cerro Prieto field has been divided have been completed. Both exploratory and production wells have been drilled; problems of partial or total lack of controlmore » have made it necessary to abandon some of these wells, since they were unsafe to keep in production or even to be used for observation and/or study. The wells and their type, the type of constructed wells and the accumulative meters that have been drilled for such wells are summarized.« less
Judy Creek: Successful use of offset VSP to find porosity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Campbell, A.; Pearcy, R.; Lee, H.
1994-12-31
In March of 1993, Imperial Oil Resources Ltd. drilled the Judy Creek 14-7-64-10w5 well. The target was porosity on the front of the Judy Creek ``A`` reef. The well encountered poor porosity development. Available surface seismic was of low resolution, so an alternative method was sought to locate better porosity. An offset VSP was acquired, and an anomaly was observed on the P-wave data at a distance of 125 meters form the well. A short radius horizontal radial was drilled from the existing wellbore and encountered porosity development at 125 meters from the well bore. Subsequently, S-wave processing was carriedmore » out. Once again, an anomaly was observed at 125 meters form the well bore. The S-waves had the additional advantage of providing better resolution of the porous zone than the P-wave image.« less
30 CFR 250.413 - What must my description of well drilling design criteria address?
Code of Federal Regulations, 2013 CFR
2013-07-01
... design criteria address? 250.413 Section 250.413 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL... of well drilling design criteria address? Your description of well drilling design criteria must... the completion phases, including the anticipated surface pressure used for designing the production...
30 CFR 250.413 - What must my description of well drilling design criteria address?
Code of Federal Regulations, 2012 CFR
2012-07-01
... design criteria address? 250.413 Section 250.413 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL... of well drilling design criteria address? Your description of well drilling design criteria must... the completion phases, including the anticipated surface pressure used for designing the production...
30 CFR 250.413 - What must my description of well drilling design criteria address?
Code of Federal Regulations, 2014 CFR
2014-07-01
... design criteria address? 250.413 Section 250.413 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL... of well drilling design criteria address? Your description of well drilling design criteria must... the completion phases, including the anticipated surface pressure used for designing the production...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pekney, Natalie J.; Reeder, Matthew; Veloski, Garret A.
The West Virginia Department of Environmental Protection’s Office of Oil and Gas was directed according to the Natural Gas Horizontal Well Control Act of December 14, 2011 (West Virginia Code §22-6A) to conduct studies of horizontal well drilling activities related to air quality. The planned study, “Noise, Light, Dust, Volatile Organic Compounds Related to Well Location Restrictions,” required determination of the effectiveness of a 625 ft minimum set-back from the center of the pad of a horizontal well drilling site to the nearest occupied dwelling. An investigation was conducted at seven drilling sites by West Virginia University (WVU) and themore » National Energy Technology Laboratory (NETL) to collect data on dust, hydrocarbon compounds and on noise, radiation, and light levels. NETL’s role in this study was to collect measurements of ambient pollutant concentrations at six of the seven selected sites using NETL’s Mobile Air Monitoring Laboratory. The trailer-based laboratory was situated a distance of 492–1,312 ft from each well pad, on which activities included well pad construction, vertical drilling, horizontal drilling, hydraulic fracturing, and flaring, with the objective of evaluating the air quality impact of each activity for 1–4 weeks per site. Measured pollutants included volatile organic compounds (VOCs), coarse and fine particulate matter (PM 10 and PM 2.5, respectively), ozone, methane (CH 4), carbon dioxide (CO 2), carbon isotopes of CH 4 and CO 2, organic carbon (OC), elemental carbon (EC), oxides of nitrogen (NOx), and sulfur dioxide (SO 2).« less
Lee, M.W.; Collett, T.S.; Lewis, K.A.
2012-01-01
Through the use of 3-D seismic amplitude mapping, several gashydrate prospects were identified in the Alaminos Canyon (AC) area of the Gulf of Mexico. Two locations were drilled as part of the Gulf of MexicoGasHydrate Joint Industry Project Leg II (JIP Leg II) in May of 2009 and a comprehensive set of logging-while-drilling (LWD) logs were acquired at each well site. LWD logs indicated that resistivity in the range of ~2 ohm-m and P-wave velocity in the range of ~1.9 km/s were measured in the target sand interval between 515 and 645 feet below sea floor. These values were slightly elevated relative to those measured in the sediment above and below the target sand. However, the initial well log analysis was inconclusive regarding the presence of gashydrate in the logged sand interval, mainly because largewashouts caused by drilling in the target interval degraded confidence in the well log measurements. To assess gashydratesaturations in the sedimentary section drilled in the Alaminos Canyon 21B (AC21-B) well, a method of compensating for the effect of washouts on the resistivity and acoustic velocities was developed. The proposed method models the washed-out portion of the borehole as a vertical layer filled with sea water (drilling fluid) and the apparent anisotropic resistivity and velocities caused by a vertical layer are used to correct the measured log values. By incorporating the conventional marine seismic data into the well log analysis, the average gashydratesaturation in the target sand section in the AC21-Bwell can be constrained to the range of 8–28%, with 20% being our best estimate.
Mountain Home Air Force Base, Idaho Geothermal Resource Assessment and Future Recommendations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Joseph C. Armstrong; Robert P. Breckenridge; Dennis L. Nielson
2013-03-01
The U.S. Air Force is facing a number of challenges as it moves into the future, one of the biggest being how to provide safe and secure energy to support base operations. A team of scientists and engineers met at Mountain Home Air Force Base in early 2011 near Boise, Idaho, to discuss the possibility of exploring for geothermal resources under the base. The team identified that there was a reasonable potential for geothermal resources based on data from an existing well. In addition, a regional gravity map helped identify several possible locations for drilling a new well. The teammore » identified several possible sources of funding for this well—the most logical being to use U.S. Department of Energy funds to drill the upper half of the well and U.S. Air Force funds to drill the bottom half of the well. The well was designed as a slimhole well in accordance with State of Idaho Department of Water Resources rules and regulations. Drilling operations commenced at the Mountain Home site in July of 2011 and were completed in January of 2012. Temperatures increased gradually, especially below a depth of 2000 ft. Temperatures increased more rapidly below a depth of 5500 ft. The bottom of the well is at 5976 ft, where a temperature of about 140°C was recorded. The well flowed artesian from a depth below 5600 ft, until it was plugged off with drilling mud. Core samples were collected from the well and are being analyzed to help understand permeability at depth. Additional tests using a televiewer system will be run to evaluate orientation and directions at fractures, especially in the production zone. A final report on the well exploitation will be forthcoming later this year. The Air Force will use it to evaluate the geothermal resource potential for future private development options at Mountain Home Air Force Base. In conclusion, Recommendation for follow-up efforts include the following:« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Joseph C. Armstrong; Robert P. Breckenridge; Dennis L. Nielson
The U.S. Air Force is facing a number of challenges as it moves into the future, one of the biggest being how to provide safe and secure energy to support base operations. A team of scientists and engineers met at Mountain Home Air Force Base near Boise, Idaho, to discuss the possibility of exploring for geothermal resources under the base. The team identified that there was a reasonable potential for geothermal resources based on data from an existing well. In addition, a regional gravity map helped identify several possible locations for drilling a new well. The team identified several possiblemore » sources of funding for this well—the most logical being to use U.S. Department of Energy funds to drill the upper half of the well and U.S. Air Force funds to drill the bottom half of the well. The well was designed as a slimhole well in accordance with State of Idaho Department of Water Resources rules and regulations. Drilling operations commenced at the Mountain Home site in July of 2011 and were completed in January of 2012. Temperatures increased gradually, especially below a depth of 2000 ft. Temperatures increased more rapidly below a depth of 5500 ft. The bottom of the well is at 5976 ft, where a temperature of about 140°C was recorded. The well flowed artesian from a depth below 5600 ft, until it was plugged off with drilling mud. Core samples were collected from the well and are being analyzed to help understand permeability at depth. Additional tests using a televiewer system will be run to evaluate orientation and directions at fractures, especially in the production zone. A final report on the well exploitation will be forthcoming later this year. The Air Force will use it to evaluate the geothermal resource potential for future private development options at Mountain Home AFB.« less
Advantages and limitations of remotely operated sea floor drill rigs
NASA Astrophysics Data System (ADS)
Freudenthal, T.; Smith, D. J.; Wefer, G.
2009-04-01
A variety of research targets in marine sciences including the investigation of gas hydrates, slope stability, alteration of oceanic crust, ore formation and palaeoclimate can be addressed by shallow drilling. However, drill ships are mostly used for deep drillings, both because the effort of building up a drill string from a drill ship to the deep sea floor is tremendous and control on drill bit pressure from a movable platform and a vibrating drill string is poor especially in the upper hundred meters. During the last decade a variety of remotely operated drill rigs have been developed, that are deployed on the sea bed and operated from standard research vessels. These developments include the BMS (Bentic Multicoring System, developed by Williamson and Associates, operated by the Japanese Mining Agency), the PROD (Portable Remotely Operated Drill, developed and operated by Benthic Geotech), the Rockdrill 2 (developed and operated by the British geological Survey) and the MeBo (German abbreviation for sea floor drill rig, developed and operated by Marum, University of Bremen). These drill rigs reach drilling depths between 15 and 100 m. For shallow drillings remotely operated drill rigs are a cost effective alternative to the services of drill ships and have the major advantage that the drilling operations are performed from a stable platform independent of any ship movements due to waves, wind or currents. Sea floor drill rigs can be deployed both in shallow waters and the deep sea. A careful site survey is required before deploying the sea floor drill rig. Slope gradient, small scale topography and soil strength are important factors when planning the deployment. The choice of drill bits and core catcher depend on the expected geology. The required drill tools are stored on one or two magazines on the drill rig. The MeBo is the only remotely operated drill rig world wide that can use wire line coring technique. This method is much faster than conventional drilling. It has the advantage that the drill string stays in the drilled hole during the entire drilling process and prevents the drilled hole from collapsing while the inner core barrels comprising the drilled core sections are hooked up inside the drill string using a wire.
An assessment of the mechanical stability of wells offshore Nigeria
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lowrey, J.P.; Ottesen, S.
In 1991 lost time due to stuck pipe related drilling problems accounted for approximately 18% of total drilling time in Mobil Producing Nigeria Ultd.`s (MPN) offshore operations. The primary cause of stuck pipe was identified as mechanical wellbore instability. This paper presents an assessment of the mechanical stability of MPN`s wells offshore Nigeria. The objectives of the study were to: (1) determine the magnitude of the in-situ principal stresses and material properties of the troublesome Intra-Biafra and Qua Iboe shale sequences; (2) quantify the drilling fluid densities required to drill mechanically stable wells through these formations; (3) review and recommendmore » well planning and operational parameters which aid in minimizing wellbore stability-related drilling problems. The well-bore stability assessment was carried out with the aid of a 3-dimensional wellbore stability model using field derived data from the study area to corroborate the results. The collection and analysis of drilling data (borehole geometry and density logs, pore pressure, leak-off tests, local geology and other relevant well records) to determine the magnitude of the in-situ principal stresses, together with compressive strength tests on formation cores are discussed. Minimum safe drilling fluid densities to promote wellbore stability as a function of well geometry and depth are presented for the most troublesome shales drilled in the study area. Implementation of the results reduced wellbore stability related problems and associated trouble time to less than 5% in 1992.« less
Cost analysis of ground-water supplies in the North Atlantic region, 1970
Cederstrom, Dagfin John
1973-01-01
The cost of municipal and industrial ground water (or, more specifically, large supplies of ground water) at the wellhead in the North Atlantic Region in 1970 generally ranged from 1.5 to 5 cents per thousand gallons. Water from crystalline rocks and shale is relatively expensive. Water from sandstone is less so. Costs of water from sands and gravels in glaciated areas and from Coastal Plain sediments range from moderate to very low. In carbonate rocks costs range from low to fairly high. The cost of ground water at the wellhead is low in areas of productive aquifers, but owing to the cost of connecting pipe, costs increase significantly in multiple-well fields. In the North Atlantic Region, development of small to moderate supplies of ground water may offer favorable cost alternatives to planners, but large supplies of ground water for delivery to one point cannot generally be developed inexpensively. Well fields in the less productive aquifers may be limited by costs to 1 or 2 million gallons a day, but in the more favorable aquifers development of several tens of millions of gallons a day may be practicable and inexpensive. Cost evaluations presented cannot be applied to any one specific well or specific site because yields of wells in any one place will depend on the local geologic and hydrologic conditions; however, with such cost adjustments as may be necessary, the methodology presented should have wide applicability. Data given show the cost of water at the wellhead based on the average yield of several wells. The cost of water delivered by a well field includes costs of connecting pipe and of wells that have the yields and spacings specified. Cost of transport of water from the well field to point of consumption and possible cost of treatment are not evaluated. In the methodology employed, costs of drilling and testing, pumping equipment, engineering for the well field, amortization at 5% percent interest, maintenance, and cost of power are considered. The report includes an analysis of test drilling costs leading to a production well field. The discussion shows that test drilling is a relatively low cost item and that more than a minimum of test holes in a previously unexplored area is, above all, simple insurance in keeping down costs and may easily result in final lower costs for the system. Use of the jet drill for testing is considered short sighted and may result in higher total costs and possibly failure to discover good aquifers. Economic development of ground water supplies will depend on obtaining qualified hydrologic and engineering advice, on carrying out adequate test drilling, and on utilizing high-quality (at times, more costly) material.
Monroe, Utah, Hydrothermal System: Results from Drilling of Test Wells MC1 and MC2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, D.S.; Harrison, Roger
1978-10-01
Following detailed geological (Parry et al., 1976; Miller, 1976) and geophysical (Mase, Chapman, and Ward, 1978; Kilty, Mase, and Chapman, 1978) studies of the Monroe, Utah hydrothermal system, a program of drilling two intermediate depth test wells was undertaken. The objectives of the test well drilling were three-fold: (1) to obtain structural information bearing on the poorly known dip of the Sevier Fault, (2) to obtain temperature information below the shallow depths (approximately 300 ft.) sampled in the first phase of exploration, and (3) to provide cased wells which could act as monitor wells during the production phase of themore » project. The test well drilling was seen to be vital to the selection of a site for a production well. This report describes the results from the drilling of the two test wells, designated MC1 and MC2, and offers interpretation of the hydrothermal system which may be used as a basis for selecting production wells.« less
Resonant acoustic transducer and driver system for a well drilling string communication system
Chanson, Gary J.; Nicolson, Alexander M.
1981-01-01
The acoustic data communication system includes an acoustic transmitter and receiver wherein low frequency acoustic waves, propagating in relatively loss free manner in well drilling string piping, are efficiently coupled to the drill string and propagate at levels competitive with the levels of noise generated by drilling machinery also present in the drill string. The transmitting transducer incorporates a mass-spring piezoelectric transmitter and amplifier combination that permits self-oscillating resonant operation in the desired low frequency range.
2017-01-01
Energy Information Administration’s (EIA) new Drilling Productivity Report (DPR) takes a fresh look at oil and natural gas production, starting with an assessment of how and where drilling for hydrocarbons is taking place. The DPR uses recent data on the total number of drilling rigs in operation along with estimates of drilling productivity and estimated changes in production from existing oil and natural gas wells to provide estimated changes in oil and natural gas production for six key fields. EIA's approach does not distinguish between oil-directed rigs and gas-directed rigs because once a well is completed it may produce both oil and gas; more than half of the wells produce both.
Ingraffea, Anthony R; Wells, Martin T; Santoro, Renee L; Shonkoff, Seth B C
2014-07-29
Casing and cement impairment in oil and gas wells can lead to methane migration into the atmosphere and/or into underground sources of drinking water. An analysis of 75,505 compliance reports for 41,381 conventional and unconventional oil and gas wells in Pennsylvania drilled from January 1, 2000-December 31, 2012, was performed with the objective of determining complete and accurate statistics of casing and cement impairment. Statewide data show a sixfold higher incidence of cement and/or casing issues for shale gas wells relative to conventional wells. The Cox proportional hazards model was used to estimate risk of impairment based on existing data. The model identified both temporal and geographic differences in risk. For post-2009 drilled wells, risk of a cement/casing impairment is 1.57-fold [95% confidence interval (CI) (1.45, 1.67); P < 0.0001] higher in an unconventional gas well relative to a conventional well drilled within the same time period. Temporal differences between well types were also observed and may reflect more thorough inspections and greater emphasis on finding well leaks, more detailed note taking in the available inspection reports, or real changes in rates of structural integrity loss due to rushed development or other unknown factors. Unconventional gas wells in northeastern (NE) Pennsylvania are at a 2.7-fold higher risk relative to the conventional wells in the same area. The predicted cumulative risk for all wells (unconventional and conventional) in the NE region is 8.5-fold [95% CI (7.16, 10.18); P < 0.0001] greater than that of wells drilled in the rest of the state.
Vectorization of a penalty function algorithm for well scheduling
NASA Technical Reports Server (NTRS)
Absar, I.
1984-01-01
In petroleum engineering, the oil production profiles of a reservoir can be simulated by using a finite gridded model. This profile is affected by the number and choice of wells which in turn is a result of various production limits and constraints including, for example, the economic minimum well spacing, the number of drilling rigs available and the time required to drill and complete a well. After a well is available it may be shut in because of excessive water or gas productions. In order to optimize the field performance a penalty function algorithm was developed for scheduling wells. For an example with some 343 wells and 15 different constraints, the scheduling routine vectorized for the CYBER 205 averaged 560 times faster performance than the scalar version.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ambrose, W.A.; Jackson, M.L.W.; Finley, R.J.
1988-01-01
Geologically based infill-drilling strategies hold great potential for extension of domestic gas resources. Traditional gas-well drilling and development have often assumed homogeneous and continuous reservoirs; uniform gas-well spacing has resulted in numerous untapped reservoirs isolated from other productive sand bodies. Strategically located infill wells drilled into these undrained reservoirs may ultimately contact an additional 20% of original gas in place in Texas gas fields. Tertiary formations in the Texas Gulf Coast commonly exhibit multiple fluvial and fluvial-deltaic reservoirs that contain vertical and horizontal permeability barriers. For example, the Frio La Gloria field (Jim Wells and Brooks Counties, Texas) contains isolatedmore » and compartmentalized reservoirs that can be related to the irregular distribution of heterogeneous facies. Net-sand and log-facies maps in areas of dense well spacing delineate relatively continuous pay defined by lenticular point-bar and channel-fill deposits 1,500-2,500 ft wide. These point-bar deposits are flanked laterally by sand-poor levee and splay facies that isolate the reservoirs into narrow, dip-elongate bands.« less
Gaven, Jr., Joseph V.; Bak, Chan S.
1983-01-01
Minute durable plate-like thermal indicators are employed for precision measuring static and dynamic temperatures of well drilling fluids. The indicators are small enough and sufficiently durable to be circulated in the well with drilling fluids during the drilling operation. The indicators include a heat resistant indicating layer, a coacting meltable solid component and a retainer body which serves to unitize each indicator and which may carry permanent indicator identifying indicia. The indicators are recovered from the drilling fluid at ground level by known techniques.
Resonant acoustic transducer system for a well drilling string
Nardi, Anthony P.
1981-01-01
For use in transmitting acoustic waves propated along a well drilling string, a piezoelectric transducer is provided operating in the relatively low loss acoustic propagation range of the well drilling string. The efficiently coupled transmitting transducer incorporates a mass-spring-piezoelectric transmitter combination permitting a resonant operation in the desired low frequency range.
Resonant acoustic transducer system for a well drilling string
Kent, William H.; Mitchell, Peter G.
1981-01-01
For use in transmitting acoustic waves propagated along a well drilling string, a piezoelectric transducer is provided operating in the relatively low loss acoustic propagation range of the well drilling string. The efficiently coupled transmitting transducer incorporates a mass-spring-piezoelectric transmitter combination permitting resonant operation in the desired low frequency range.
Shale gas development and cancer incidence in southwest Pennsylvania.
Finkel, M L
2016-12-01
To what extent does unconventional gas development lead to an increase in cancer incidence in heavily drilled Southwest Pennsylvania? Ecological study. Data for urinary bladder, thyroid and leukaemia were abstracted from the Pennsylvania Cancer Registry (PCR). Cancer incidence among counties with high, moderate and minimal number of producing wells is compared before drilling activity and thereafter. Observed vs expected cases, standardized incidence ratio and 95% confidence intervals are presented. Data are presented by county, diagnosis and sex for the years 2000-2004, 2004-2008 and 2008-2012. The percent difference between the observed cases from 2000 to 2004 and 2008-2012 was calculated. The observed number of urinary bladder cases was higher than expected in both sexes in counties with shale gas activity. In counties with the fewest number of producing wells, the increase was essentially non-existent. The number of observed cases of thyroid cancer increased substantially among both sexes over the time period in all counties regardless of the number of wells drilled. The pattern for leukaemia was mixed among males and females and among the counties regardless of the extent of shale gas development activities. Potential risk factors other than shale gas development must be taken into account to explain the higher than expected cancer cases in counties with and without shale gas wells before and during unconventional shale gas activity. Copyright © 2016 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis; Homer Robertson; Alan Black
2006-06-22
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high rotational speeds (greater than 10,000 rpm). The work includes a feasibility of concept research effort aimed at development that will ultimately result in the ability to reliably drill ''faster and deeper'' possibly with smaller, more mobile rigs. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration (ROP) rock cutting with substantially lower inputs of energymore » and loads. The significance of the ''ultra-high rotary speed drilling system'' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm-usually well below 5,000 rpm. This document details the progress at the end of Phase 1 on the program entitled ''Smaller Footprint Drilling System for Deep and Hard Rock Environments: Feasibility of Ultra-High-Speed Diamond Drilling'' for the period starting 1 March 2006 and concluding 30 June 2006. (Note: Results from 1 September 2005 through 28 February 2006 were included in the previous report (see Judzis, Black, and Robertson)). Summarizing the accomplished during Phase 1: {lg_bullet} TerraTek reviewed applicable literature and documentation and convened a project kickoff meeting with Industry Advisors in attendance (see Black and Judzis). {lg_bullet} TerraTek designed and planned Phase I bench scale experiments (See Black and Judzis). Some difficulties continued in obtaining ultra-high speed motors. Improvements were made to the loading mechanism and the rotational speed monitoring instrumentation. New drill bit designs were developed to provided a more consistent product with consistent performance. A test matrix for the final core bit testing program was completed. {lg_bullet} TerraTek concluded Task 3 ''Small-scale cutting performance tests.'' {sm_bullet} Significant testing was performed on nine different rocks. {sm_bullet} Five rocks were used for the final testing. The final tests were based on statistical design of experiments. {sm_bullet} Two full-faced bits, a small diameter and a large diameter, were run in Berea sandstone. {lg_bullet} Analysis of data was completed and indicates that there is decreased specific energy as the rotational speed increases (Task 4). Data analysis from early trials was used to direct the efforts of the final testing for Phase I (Task 5). {lg_bullet} Technology transfer (Task 6) was accomplished with technical presentations to the industry (see Judzis, Boucher, McCammon, and Black).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
TerraTek, A Schlumberger Company
2008-12-31
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high rotational speeds (greater than 10,000 rpm). The work includes a feasibility of concept research effort aimed at development that will ultimately result in the ability to reliably drill 'faster and deeper' possibly with smaller, more mobile rigs. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration (ROP) rock cutting with substantially lower inputs of energymore » and loads. The significance of the 'ultra-high rotary speed drilling system' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm - usually well below 5,000 rpm. This document provides the progress through two phases of the program entitled 'Smaller Footprint Drilling System for Deep and Hard Rock Environments: Feasibility of Ultra-High-Speed Diamond Drilling' for the period starting 30 June 2003 and concluding 31 March 2009. The accomplishments of Phases 1 and 2 are summarized as follows: (1) TerraTek reviewed applicable literature and documentation and convened a project kick-off meeting with Industry Advisors in attendance (see Black and Judzis); (2) TerraTek designed and planned Phase I bench scale experiments (See Black and Judzis). Improvements were made to the loading mechanism and the rotational speed monitoring instrumentation. New drill bit designs were developed to provided a more consistent product with consistent performance. A test matrix for the final core bit testing program was completed; (3) TerraTek concluded small-scale cutting performance tests; (4) Analysis of Phase 1 data indicated that there is decreased specific energy as the rotational speed increases; (5) Technology transfer, as part of Phase 1, was accomplished with technical presentations to the industry (see Judzis, Boucher, McCammon, and Black); (6) TerraTek prepared a design concept for the high speed drilling test stand, which was planned around the proposed high speed mud motor concept. Alternative drives for the test stand were explored; a high speed hydraulic motor concept was finally used; (7) The high speed system was modified to accommodate larger drill bits than originally planned; (8) Prototype mud turbine motors and the high speed test stand were used to drive the drill bits at high speed; (9) Three different rock types were used during the testing: Sierra White granite, Crab Orchard sandstone, and Colton sandstone. The drill bits used included diamond impregnated bits, a polycrystalline diamond compact (PDC) bit, a thermally stable PDC (TSP) bit, and a hybrid TSP and natural diamond bit; and (10) The drill bits were run at rotary speeds up to 5500 rpm and weight on bit (WOB) to 8000 lbf. During Phase 2, the ROP as measured in depth of cut per bit revolution generally increased with increased WOB. The performance was mixed with increased rotary speed, with the depth cut with the impregnated drill bit generally increasing and the TSP and hybrid TSP drill bits generally decreasing. The ROP in ft/hr generally increased with all bits with increased WOB and rotary speed. The mechanical specific energy generally improved (decreased) with increased WOB and was mixed with increased rotary speed.« less
Fire in the OR--developing a fire safety plan.
McCarthy, Patricia M; Gaucher, Kenneth A
2004-03-01
Approximately 100 operating room fire occur each year in the United States. Although rare, fire in a perioperative setting can be disastrous for both patients and staff members. It is crucial that all perioperative departments have a well thought out and previously rehearsed fire plan in place. Multidisciplinary planning and implementation of regularly scheduled and scripted fire drills are essential to prevent adverse outcomes. Fire drills ensure that all staff members are familiar with the use and location of fire pull stations, fire extinguishers, and fire blankets. Fire drills also prepare staff members to evacuate the OR area if necessary. This article provides the information and framework necessary to develop and implement comprehensive OR fire safety plans that could make the difference between life and death in a fire emergency.
Investigations of Very High Enthalpy Geothermal Resources in Iceland.
NASA Astrophysics Data System (ADS)
Elders, W. A.; Fridleifsson, G. O.
2012-12-01
The Iceland Deep Drilling Project (IDDP) is investigating the economic feasibility of producing electricity from supercritical geothermal reservoirs. Earlier modeling indicates that the power output of a geothermal well producing from a supercritical reservoir could potentially be an order of magnitude greater than that from a conventional hot geothermal reservoir, at the same volumetric flow rate. However, even in areas with an unusually high geothermal gradient, for normal hydrostatic pressure gradients reaching supercritical temperatures and pressures will require drilling to depths >4 km. In 2009 the IDDP attempted to drill the first deep supercritical well, IDDP-01, in the caldera of the Krafla volcano, in NE Iceland. However drilling had to be terminated at only 2.1 km depth when ~900°C rhyolite magma flowed into the well. Our studies indicate that this magma formed by partial melting of hydrothermally altered basalts within the Krafla caldera. Although this well was too shallow to reach supercritical pressures, it is highly productive, and is estimated to be capable of generating up to 36 MWe from the high-pressure, superheated steam produced from the upper contact zone of the intrusion. With a well-head temperature of ~440°C, it is at present apparently the hottest producing geothermal well in the world. A pilot plant is investigating the optimal utilization of this magmatically heated resource. A special issue of the journal Geothermics with 16 papers reporting on the IDDP-01 is in preparation. However, in order to continue the search for supercritical geothermal resources, planning is underway to drill a 4.5 km deep well at Reykjanes in SW Iceland in 2013-14. Although drilling deeper towards the heat source of this already developed high-temperature geothermal field will be more expensive, if a supercritical resource is found, this cost increase should be offset by the considerable increase in the power output and lifetime of the Reykjanes geothermal reservoir, without increasing its environmental foot print. If these efforts are successful, in future such very high enthalpy geothermal systems worldwide could become significant energy resources, where ever suitable young volcanic rocks occur, such as in the western USA, Hawaii, and Alaska.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sippel, M.; Luff, K.D.; Hendricks, M.L.
1998-07-01
This topical report is a compilation of characterizations by different disciplines of the Mississippian Ratcliffe in portions of Richland County, MT. Goals of the report are to increase understanding of the reservoir rocks, oil-in-place, heterogeneity and methods for improved recovery. The report covers investigations of geology, petrography, reservoir engineering and seismic. The Ratcliffe is a low permeability oil reservoir which appears to be developed across much of the study area and occurs across much of the Williston Basin. The reservoir has not been a primary drilling target in the study area because average reserves have been insufficient to payout themore » cost of drilling and completion despite the application of hydraulic fracture stimulation. Oil trapping does not appear to be structurally controlled. For the Ratcliffe to be a viable drilling objective, methods need to be developed for (1) targeting better reservoir development and (2) better completions. A geological model is presented for targeting areas with greater potential for commercial reserves in the Ratcliffe. This model can be best utilized with the aid of 3D seismic. A 3D seismic survey was acquired and is used to demonstrate a methodology for targeting the Ratcliffe. Other data obtained during the project include oriented core, special formation-imaging log, pressure transient measurements and oil PVT. Although re-entry horizontal drilling was unsuccessfully tested, this completion technology should improve the economic viability of the Ratcliffe. Reservoir simulation of horizontal completions with productivity of three times that of a vertical well suggested two or three horizontal wells in a 258-ha (640-acre) area could recover sufficient reserves for profitable drilling.« less
NASA Astrophysics Data System (ADS)
Elders, W. A.; Fridleifsson, G. O.; Bird, D. K.; Reed, M. H.; Schiffman, P.; Zierenberg, R.
2008-12-01
The IDDP is being carried out by an international industry-government consortium in Iceland (consisting of three leading Icelandic power companies, together with the National Energy Authority), Alcoa Inc. and StatoilHydro) with the objective of investigating the economic feasibility of producing electricity from supercritical geothermal fluids. This will require drilling to temperatures of 400-600°C and depths of 4 to 5 km. Modeling suggests that supercritical water could yield an order of magnitude greater power output than that produced by conventional geothermal wells. The consortium plans to test this concept in three different geothermal fields in Iceland. If successful, major improvements in the development of high-temperature geothermal resources could result worldwide. In June 2008 preparation of the first deep IDDP well commenced in the Krafla volcanic caldera in the active rift zone of NE Iceland. Selection of the first drill site for this well was based on geological, geophysical and geochemical data, and on the results of extensive geothermal drilling since 1971. During 1975-1984, a rifting episode occurred in the caldera, involving 9 volcanic eruptions. In parts of the geothermal field acid volcanic gases made steam from some of the existing wells unsuitable for power generation for the following decade. A large magma chamber at 3-7 km depth was detected by S-wave attenuation beneath the center of the caldera, believed to be the heat source of the geothermal system. A recent MT-survey has confirmed the existence of low resistivity bodies at shallow depths within the volcano. The IDDP well will be drilled and cased to 800m depth in September, before the winter snows, and in spring 2009 it will be drilled and cased to 3.5km depth and then deepened to 4.5 km in July. Several spot cores for scientific studies will be collected between 2400m and the total depth. After the well heats, it will be flow tested and, if successful, a pilot plant for power production should follow in 2010. During 2009-19 two new wells, ~4 km deep, will be drilled at the Hengill and the Reykjanes geothermal fields in southern Iceland, and subsequently deepened into the supercritical zone. In contrast to the fresh water systems at Krafla and Hengill, the Reykjanes geothermal system produces hydrothermally modified seawater on the Reykjanes peninsula, where the Mid-Atlantic Ridge comes on land. Processes at depth at Reykjanes should be more similar to those responsible for black smokers on oceanic rift systems. Because of the considerable international scientific opportunities afforded by the IDDP, the US National Science Foundation and the International Continental Scientific Drilling Program will jointly fund the coring and sampling for scientific studies. Research is underway on samples from existing wells in the targeted geothermal fields, and on active mid-ocean ridge systems that have conditions believed to be similar to those that will be encountered in deep drilling by the IDDP. Some of these initial scientific studies by US investigators are reported in the accompanying papers.
Data on cost analysis of drilling mud displacement during drilling operation.
Okoro, Emeka Emmanuel; Dosunmu, Adewale; Iyuke, Sunny E
2018-08-01
The focus of this research was to present a data article for analyzing the cost of displacing a drilling fluid during the drilling operation. The cost of conventional Spud, KCl and Pseudo Oil base (POBM) muds used in drilling oil and gas wells are compared with that of a Reversible Invert Emulsion Mud. The cost analysis is limited to three sections for optimum and effective Comparison. To optimize drilling operations, it is important that we specify the yardstick by which drilling performance is measured. The most relevant yardstick is the cost per foot drilled. The data have shown that the prices for drilling mud systems are a function of the mud system formulation cost for that particular mud weight and maintenance per day. These costs for different mud systems and depend on the base fluid. The Reversible invert emulsion drilling fluid, eliminates the cost acquired in displacing Pseudo Oil Based mud (POBM) from the well, possible formation damage (permeability impairment) resulting from the use of viscous pill in displacing the POBM from the wellbore, and also eliminates the risk of taking a kick during mud change-over. With this reversible mud system, the costs of special fluids that are rarely applied for the well-completion purpose (cleaning of thick mud filter cake) may be reduced to the barest minimum.
Method and apparatus for optimizing determination of the originating depth of borehole cuttings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mc Auley, J.A.; Eppler, S.G.
1987-11-24
This patent describes a method for determining the arrival at the surface of an identifiable material from a predetermined drilling depth independent of pump stroke rate and intermittent operations during the utilization of at least a drill bit, a positive displacement mud pump and drilling mud during the drilling of a well. The method comprises the steps of: adding identifiable material to the drilling mud as the drilling mud is being pumped downwardly into the well; initiate count of the pump strokes of the positive displacement mud pump as the previous step occurs; observe arrival of the identifiable material atmore » the surface of the earth as the drilling mud exits from the well; observe the accumulated count of the pump strokes of the positive displacement mud pump which occur between step one and step three; subtract, from the accumulated count of the previous step, the number of pump strokes of the positive displacement mud pump required to pump the identifiable material down to the drill bit to establish a number of lag strokes; and utilize the number obtained in the previous step to identify the arrival of drill cuttings from a predetermined depth.« less
Hüfner, T; Geerling, J; Oldag, G; Richter, M; Kfuri, M; Pohlemann, T; Krettek, C
2005-01-01
This study was designed to determine the clinical relevant accuracy of CT-based navigation for drilling. Experimental model. Laboratory. Twelve drills of varying lengths and diameters were tested with 2 different set-ups. Group 1 used free-hand navigated drilling technique with foam blocks equipped with titanium target points. Group 2 (control) used a newly developed 3-dimensional measurement device equipped with titanium target points with a fixed entry for the navigated drill to minimize bending forces. One examiner performed 690 navigated drillings using solely the monitor screen for control in both groups. The difference between the planned and the actual starting and target point (up to 150 mm distance) was measured (mm). Levene test and a nonpaired t test. Significance level was set as P < 0.05. The core accuracy of the navigation system measured with the 3-dimensional device was 0.5 mm. The mean distance from planned to actual entry points in group 1 was 1.3 (range, 0.6-3.4 mm). The mean distance between planned and actual target point was 3.4 (range, 1.7-5.8 mm). Free-hand navigated drilling showed an increased difference with increased length of the drill bits as well as with increased drilling channel for drill bits 2.5 and 3.2 mm and not for 3.5 and 4.5 mm (P < 0.05). The core accuracy of the navigation system is high. Compared with the navigated free-hand technique, the results suggest that drill bit deflection interferes directly with the precision. The precision is decreased when using small diameter and longer drill bits.
Reaching 1 m deep on Mars: the Icebreaker drill.
Zacny, K; Paulsen, G; McKay, C P; Glass, B; Davé, A; Davila, A F; Marinova, M; Mellerowicz, B; Heldmann, J; Stoker, C; Cabrol, N; Hedlund, M; Craft, J
2013-12-01
The future exploration of Mars will require access to the subsurface, along with acquisition of samples for scientific analysis and ground-truthing of water ice and mineral reserves for in situ resource utilization. The Icebreaker drill is an integral part of the Icebreaker mission concept to search for life in ice-rich regions on Mars. Since the mission targets Mars Special Regions as defined by the Committee on Space Research (COSPAR), the drill has to meet the appropriate cleanliness standards as requested by NASA's Planetary Protection Office. In addition, the Icebreaker mission carries life-detection instruments; and in turn, the drill and sample delivery system have to meet stringent contamination requirements to prevent false positives. This paper reports on the development and testing of the Icebreaker drill, a 1 m class rotary-percussive drill and triple redundant sample delivery system. The drill acquires subsurface samples in short, approximately 10 cm bites, which makes the sampling system robust and prevents thawing and phase changes in the target materials. Autonomous drilling, sample acquisition, and sample transfer have been successfully demonstrated in Mars analog environments in the Arctic and the Antarctic Dry Valleys, as well as in a Mars environmental chamber. In all environments, the drill has been shown to perform at the "1-1-100-100" level; that is, it drilled to 1 m depth in approximately 1 hour with less than 100 N weight on bit and approximately 100 W of power. The drilled substrate varied and included pure ice, ice-rich regolith with and without rocks and with and without 2% perchlorate, and whole rocks. The drill is currently at a Technology Readiness Level (TRL) of 5. The next-generation Icebreaker drill weighs 10 kg, which is representative of the flightlike model at TRL 5/6.
Geodatabase of Wyoming statewide oil and gas drilling activity to 2010
Biewick, Laura
2011-01-01
The U.S. Geological Survey (USGS) compiled a geographic information system (GIS) of Wyoming statewide historical oil and gas drilling activity for the Wyoming Landscape Conservation Initiative (WLCI). The WLCI is representative of the partnerships being formed by the USGS with other Department of the Interior bureaus, State and local agencies, industry, academia, and private landowners that are committed to maintaining healthy landscapes, sustaining wildlife, and preserving recreational and grazing uses as energy resources development progresses in southwestern Wyoming. This product complements the 2009 USGS publication on oil and gas development in southwestern Wyoming http://pubs.usgs.gov/ds/437/) by approximating, based on database attributes, the time frame of drilling activity for each well (start and stop dates). This GIS product also adds current oil and gas drilling activity not only in the area encompassing the WLCI, but also statewide. Oil and gas data, documentation, and spatial data processing capabilities are available and can be downloaded from the USGS website. These data originated from the Wyoming Oil and Gas Conservation Commission (WOGCC), represent decades of oil and gas drilling (1900 to 2010), and will facilitate a landscape-level approach to integrated science-based assessments, resource management and land-use decision making.
Slim hole drilling and testing strategies
NASA Astrophysics Data System (ADS)
Nielson, Dennis L.; Garg, Sabodh K.; Goranson, Colin
2017-12-01
The financial and geologic advantages of drilling slim holes instead of large production wells in the early stages of geothermal reservoir assessment has been understood for many years. However, the practice has not been fully embraced by geothermal developers. We believe that the reason for this is that there is a poor understanding of testing and reservoir analysis that can be conducted in slim holes. In addition to reservoir engineering information, coring through the cap rock and into the reservoir provides important data for designing subsequent production well drilling and completion. Core drilling requires significantly less mud volume than conventional rotary drilling, and it is typically not necessary to cure lost circulation zones (LCZ). LCZs should be tested by either production or injection methods as they are encountered. The testing methodologies are similar to those conducted on large-diameter wells; although produced and/or injected fluid volumes are much less. Pressure, temperature and spinner (PTS) surveys in slim holes under static conditions can used to characterize temperature and pressure distribution in the geothermal reservoir. In many cases it is possible to discharge slim holes and obtain fluid samples to delineate the geochemical properties of the reservoir fluid. Also in the latter case, drawdown and buildup data obtained using a downhole pressure tool can be employed to determine formation transmissivity and well properties. Even if it proves difficult to discharge a slim hole, an injection test can be performed to obtain formation transmissivity. Given the discharge (or injection) data from a slimhole, discharge properties of a large-diameter well can be inferred using wellbore modeling. Finally, slim hole data (pressure, temperature, transmissivity, fluid properties) together with reservoir simulation can help predict the ability of the geothermal reservoir to sustain power production.
Improving the groundwater-well siting approach in consolidated rock in Nampula Province, Mozambique
NASA Astrophysics Data System (ADS)
Chirindja, F. J.; Dahlin, T.; Juizo, D.
2017-08-01
Vertical electrical sounding was used for assessing the suitability of the drill sites in crystalline areas within a water supply project in Nampula Province in Mozambique. Many boreholes have insufficient yield (<600 L/h). Electrical resistivity tomography (ERT) was carried out over seven boreholes with sufficient yield, and five boreholes with insufficient yield, in Rapale District, in an attempt to understand the reason for the failed boreholes. Two significant hydrogeological units were identified: the altered zone (19-220 ohm-m) with disintegrated rock fragments characterized by intermediate porosity and permeability, and the fractured zone (>420 ohm-m) with low porosity and high permeability. In addition to this, there is unfractured nonpermeable intact rock with resistivity of thousands of ohm-m. The unsuccessful boreholes were drilled over a highly resistive zone corresponding to fresh crystalline rock and a narrow altered layer with lower resistivity. Successful boreholes were drilled in places where the upper layers with lower resistivity correspond to a well-developed altered layer or a well-fractured basement. There are a few exceptions with boreholes drilled in seemingly favourable locations but they were nevertheless unsuccessful boreholes for unknown reasons. Furthermore, there were boreholes drilled into very resistive zones that produced successful water wells, which may be due to narrow permeable fracture zones that are not resolved by ERT. Community involvement is proposed, in choosing between alternative borehole locations based on information acquired with a scientifically based approach, including conceptual geological models and ERT. This approach could probably lower the borehole failure rate.
30 CFR 556.70 - Extension of lease by drilling or well reworking operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Extension of lease by drilling or well... OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Assignments, Transfers, and Extensions § 556.70 Extension of lease by drilling or well reworking operations. The term of...
30 CFR 556.70 - Extension of lease by drilling or well reworking operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Extension of lease by drilling or well... OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Assignments, Transfers, and Extensions § 556.70 Extension of lease by drilling or well reworking operations. The term of...
30 CFR 256.70 - Extension of lease by drilling or well reworking operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Extension of lease by drilling or well..., DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Assignments, Transfers, and Extensions § 256.70 Extension of lease by drilling or well reworking operations...
30 CFR 556.70 - Extension of lease by drilling or well reworking operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Extension of lease by drilling or well... OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Assignments, Transfers, and Extensions § 556.70 Extension of lease by drilling or well reworking operations. The term of...
30 CFR 256.70 - Extension of lease by drilling or well reworking operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Extension of lease by drilling or well..., DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Assignments, Transfers, and Extensions § 256.70 Extension of lease by drilling or well reworking operations...
30 CFR 256.70 - Extension of lease by drilling or well reworking operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Extension of lease by drilling or well..., DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Assignments, Transfers, and Extensions § 256.70 Extension of lease by drilling or well reworking operations...
Presley, T.K.; Oki, D.S.
1996-01-01
The Thompson Corner exploratory wells I and II (State well numbers 3-3307-20 and -21) were drilled near Thompson Corner, about 2.2 miles south-southwest of the town of Haleiwa. The wells are located on agricultural land in the Waialua ground-water area. The wells are about 50 feet apart and penetrate about 90 feet into the ground water. Aquifer tests were conducted using well 3-3307-20 as a pumping well and well 3-3307-21 as an observation well. Well-construction data, logs of drilling notes, geologic descriptions for the samples, and aquifer-test data are presented for the wells. The wells are two of twelve exploratory wells drilled in the north-central Oahu area between July 1993 and May 1994 in cooperation with the Honolulu Board of Water Supply.
Concentration and Distribution of Well Drilling in the Amargosa Desert Area of Southern Nevada
NASA Astrophysics Data System (ADS)
Lee, M. P.; Gross, A. J.; Coleman, N. M.
2002-05-01
The earliest sources of fresh water supply in the Amargosa Desert area of Southern Nevada were the abundant, naturally occurring (cold) springs. They initially sustained the indigenous Native American populations and later, Euro-American miners, farmers, and ranchers. Prior to 1900, the many local springs and a few (mostly shallow) hand-dug wells were the principal sources of water supply. The first hand-dug well in the area was the Franklin well; it was dug in 1852 for workers performing a survey of the California-Nevada State line. The first mechanically bored wells were drilled for local railroads, along their respective alignments, sometime between 1905-07. About 1917, the first irrigation well in the Amargosa Desert area was drilled for an experimental farm operated by the Tonopah and Tidewater Railroad. In the late 1940s-early 1950s, permanent interest in the area was established, in large measure because of a Federally sponsored desert reclamation program. For the period 1900-1999, a preliminary evaluation of publicly available information (collected principally by the State Engineer) indicates that more than 950 boreholes were drilled in the Amargosa Desert area. Almost half of these boreholes were drilled in the last 20 years. Forty-two percent of the boreholes were drilled to supply fresh drinking water; 26 percent were in support of irrigated agriculture; 21 percent of the wells were drilled for some non-water supply related purpose - ground-water monitoring and testing; and 11 percent were drilled to supply water for commercial or unspecified applications. Most of the well drilling has been concentrated in a parcel of land about 30-40 kilometers south of the proposed geologic repository at Yucca Mountain, Nevada. Most wells have been generally drilled to depths less than 30 meters (100 feet), although deeper wells are uncommon. The main reason is that drilling is expensive and the profitability of finding and extracting potable water, in sufficient quantity, generally declines with depth. However, during the last two decades, there has been a general decline in drilling for irrigation. Designation of local aquifers in the area as "protected" in 1979 has favored new well-permitting for residential or commercial uses. Moreover, in the 1990s, local farmers were required to forfeit unused water rights and these rights have been reallocated to new, non-farming residents by the State Engineer in Nevada's Department of Conservation and Natural Resources. Nevertheless, the general decline in irrigation permitting for farming over the last several decades most likely has more to do with the physical and/or economic factors that have historically controlled local farming rather than with recent water availability issues.
Geopressure modeling from petrophysical data: An example from East Kalimantan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Herkommer, M.A.
1994-07-01
Localized models of abnormal formation pressure (geopressure) are important economic and safety tools frequently used for well planning and drilling operations. Simplified computer-based procedures have been developed that permit these models to be developed more rapidly and with greater accuracy. These techniques are broadly applicable to basins throughout the world where abnormal formation pressures occur. An example from the Attaka field of East Kalimantan, southeast Asia, shows how geopressure models are developed. Using petrophysical and engineering data, empirical correlations between observed pressure and petrophysical logs can be created by computer-assisted data-fitting techniques. These correlations serve as the basis for modelsmore » of the geopressure. By performing repeated analyses on wells at various locations, contour maps on the top of abnormal geopressure can be created. Methods that are simple in their development and application make the task of geopressure estimation less formidable to the geologist and petroleum engineer. Further, more accurate estimates can significantly improve drilling speeds while reducing the incidence of stuck pipe, kicks, and blowouts. In general, geopressure estimates are used in all phases of drilling operations: To develop mud plans and specify equipment ratings, to assist in the recognition of geopressured formations and determination of mud weights, and to improve predictions at offset locations and geologically comparable areas.« less
43 CFR 3137.40 - What initial development obligations must I define in a unit agreement?
Code of Federal Regulations, 2011 CFR
2011-10-01
... assess the reservoir adequately; (b) A primary target for each well; (c) A schedule for starting and completing drilling operations for each well; and (d) The time between starting operations on a well to the start of operations on the next well. ...
Miller, W. Roger; Strausz, S.A.
1980-01-01
A potentiometric-surface map showing freshwater heads for the Mission Canyon and Lodgepole Limestones of Mississippian age has been prepared as part of a study to determine the water-resources potential of the Mississippian Madison Limestone and associated rocks in the Northern Great Plains of Montana, North and South Dakota, and Wyoming. Most of the data used to prepare the map are from drill-stem tests of exploration and development wells drilled by the petroleum industry from 1946 to 1978. Some data are also from cased oil wells, water-production wells, and springs. A short explanation describes the seven categories of reliability used to evaluate the drill-stem-test data and identifies several factors that might explain the apparent anomalous highs and lows on the potentiometric surface. The map is at a scale of 1:1,000,000 and the potentiometric contour intervals are 100, 200, and 500 feet. (USGS)
Economic and statistical analysis of time limitations for spotting fluids and fishing operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, P.S.; Brinkmann, P.E.; Taneja, P.K.
1984-05-01
This paper reviews the statistics of ''Spotting Fluids'' to free stuck drill pipe as well as the economics and statistics of drill string fishing operations. Data were taken from Mobil Oil Exploration and Producing Southeast Inc.'s (MOEPSI) records from 1970-1981. Only those events which occur after a drill string becomes stuck are discussed. The data collected were categorized as Directional Wells and Straight Wells. Bar diagrams are presented to show the Success Ratio vs. Soaking Time for each of the two categories. An analysis was made to identify the elapsed time limit to place the spotting fluid for maximum probabilitymore » of success. Also determined was the statistical minimum soaking time and the maximum soaking time. For determining the time limit for fishing operations, the following criteria were used: 1. The Risked ''Economic Breakeven Analysis'' concept was developed based on the work of Harrison. 2. Statistical Probability of Success based on MOEPSI's records from 1970-1981.« less
Impacts on seafloor geology of drilling disturbance in shallow waters.
Corrêa, Iran C S; Toldo, Elírio E; Toledo, Felipe A L
2010-08-01
This paper describes the effects of drilling disturbance on the seafloor of the upper continental slope of the Campos Basin, Brazil, as a result of the project Environmental Monitoring of Offshore Drilling for Petroleum Exploration--MAPEM. Field sampling was carried out surrounding wells, operated by the company PETROBRAS, to compare sediment properties of the seafloor, including grain-size distribution, total organic carbon, and clay mineral composition, prior to drilling with samples obtained 3 and 22 months after drilling. The sampling grid used had 74 stations, 68 of which were located along 7 radials from the well up to a distance of 500 m. The other 6 stations were used as reference, and were located 2,500 m from the well. The results show no significant sedimentological variation in the area affected by drilling activity. The observed sedimentological changes include a fining of grain size, increase in total organic carbon, an increase in gibbsite, illite, and smectite, and a decrease in kaolinite after drilling took place.
43 CFR 3261.13 - What is a drilling program and how do I apply for drilling program approval?
Code of Federal Regulations, 2012 CFR
2012-10-01
... the well; (3) If you plan to directionally drill your well, also send us: (i) The proposed bottom hole... reservoir temperature and pressure; (11) Anticipated temperature gradient in the area; (12) A plat certified...
43 CFR 3261.13 - What is a drilling program and how do I apply for drilling program approval?
Code of Federal Regulations, 2011 CFR
2011-10-01
... the well; (3) If you plan to directionally drill your well, also send us: (i) The proposed bottom hole... reservoir temperature and pressure; (11) Anticipated temperature gradient in the area; (12) A plat certified...
43 CFR 3261.13 - What is a drilling program and how do I apply for drilling program approval?
Code of Federal Regulations, 2013 CFR
2013-10-01
... the well; (3) If you plan to directionally drill your well, also send us: (i) The proposed bottom hole... reservoir temperature and pressure; (11) Anticipated temperature gradient in the area; (12) A plat certified...
43 CFR 3261.13 - What is a drilling program and how do I apply for drilling program approval?
Code of Federal Regulations, 2014 CFR
2014-10-01
... the well; (3) If you plan to directionally drill your well, also send us: (i) The proposed bottom hole... reservoir temperature and pressure; (11) Anticipated temperature gradient in the area; (12) A plat certified...
Multi-gradient drilling method and system
Maurer, William C.; Medley, Jr., George H.; McDonald, William J.
2003-01-01
A multi-gradient system for drilling a well bore from a surface location into a seabed includes an injector for injecting buoyant substantially incompressible articles into a column of drilling fluid associated with the well bore. Preferably, the substantially incompressible articles comprises hollow substantially spherical bodies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... a result of drilling a deep well or a phase 1 ultra-deep well? 203.40 Section 203.40 Mineral... MINERALS REVENUE MANAGEMENT RELIEF OR REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General Royalty Relief for Drilling Deep Gas Wells on Leases Not Subject to Deep Water Royalty Relief § 203.40 Which...
do Carmo R Peralba, Maria; Pozebon, Dirce; dos Santos, João H Z; Maia, Sandra M; Pizzolato, Tânia M; Cioccari, Giovani; Barrionuevo, Simone
2010-08-01
The impact of drilling oil activities in the Brazilian Bonito Field/Campos Basin (Rio de Janeiro) shell drilling (300 m) using nonaqueous fluids (NAFs) was investigated with respect to Al, Fe, Mn, Ba, Co, Pb, Cu, As, Hg, Cr, Ni, Zn, Cd, V, and aliphatic and polynuclear aromatic hydrocarbons concentrations in the sediment. Sampling took place in three different times during approximately 33 months. For the metals Al, As, Co, Cr, Cu, Cd, Fe, Ni, Mn, V, and Zn, no significant variation was observed after drilling activities in most of the stations. However, an increase was found in Ba concentration--due to the drilling activity--without return to the levels found 22 months after drilling. High Ba contents was already detected prior to well drilling, probably due to drilling activities in other wells nearby. Hydrocarbon contents also suggest previous anthropogenic activities. Aliphatic hydrocarbon contents were in the range usually reported in other drilling sites. The same behavior was observed in the case of polyaromatic hydrocarbons. Nevertheless, the n-alkane concentration increased sharply after drilling, returning almost to predrilling levels 22 months after drilling activities.
Kobler, Jan-Philipp; Schoppe, Michael; Lexow, G Jakob; Rau, Thomas S; Majdani, Omid; Kahrs, Lüder A; Ortmaier, Tobias
2014-11-01
Minimally invasive cochlear implantation is a surgical technique which requires drilling a canal from the mastoid surface toward the basal turn of the cochlea. The choice of an appropriate drilling strategy is hypothesized to have significant influence on the achievable targeting accuracy. Therefore, a method is presented to analyze the contribution of the drilling process and drilling tool to the targeting error isolated from other error sources. The experimental setup to evaluate the borehole accuracy comprises a drill handpiece attached to a linear slide as well as a highly accurate coordinate measuring machine (CMM). Based on the specific requirements of the minimally invasive cochlear access, three drilling strategies, mainly characterized by different drill tools, are derived. The strategies are evaluated by drilling into synthetic temporal bone substitutes containing air-filled cavities to simulate mastoid cells. Deviations from the desired drill trajectories are determined based on measurements using the CMM. Using the experimental setup, a total of 144 holes were drilled for accuracy evaluation. Errors resulting from the drilling process depend on the specific geometry of the tool as well as the angle at which the drill contacts the bone surface. Furthermore, there is a risk of the drill bit deflecting due to synthetic mastoid cells. A single-flute gun drill combined with a pilot drill of the same diameter provided the best results for simulated minimally invasive cochlear implantation, based on an experimental method that may be used for testing further drilling process improvements.
Geologic and operational summary, COST No. G-2 well, Georges Bank area, North Atlantic OCS
Amato, Roger V.; Simonis, Edvardas K.
1980-01-01
The Continental Offshore Stratigraphic Test (COST) No. G-2 well is the second deep well to be drilled in the Georges Bank Basin and the third in a series of COST wells on the Atlantic Outer Continental Shelf (OCS). The G-2 was drilled by Ocean Production Company, acting as the operator for 19 participating companies between January 6 and August 30, 1977. The semisubmersible rig Ocean Victory was used to drill the well to a depth of 21,874 feet at a location 132 statute miles east-southeast of Nantucket Island in 272 feet of water. An earlier deep Stratigraphic test, the COST No. G-l well, was drilled 42 statute miles west of the G-2 well, to a depth of 16,071 feet in 1976 (fig. 1). Geological and engineering data obtained from the well were used by companies and the U.S. Geological Survey (USGS) for evaluating the petroleum potential and possible drilling problems in the U.S. North Atlantic OCS area in preparation for lease sale 42 held on December 18, 1979. The Stratigraphic test was intentionally drilled away from any potential petroleum-bearing feature, but in a block bordering several tracts that were included in the sale area.
An interactive drilling simulator for teaching and research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cooper, G.A.; Cooper, A.G.; Bihn, G.
1995-12-31
An interactive program has been constructed that allows a student or engineer to simulate the drilling of an oil well, and to optimize the drilling process by comparing different drilling plans. The program operates in a very user-friendly way, with emphasis on menu and button-driven commands. The simulator may be run either as a training program, with exercises that illustrate various features of the drilling process, as a game, in which a student is set a challenge to drill a well with minimum cost or time under constraints set by an instructor, or as a simulator of a real situationmore » to investigate the merit of different drilling strategies. It has three main parts, a Lithology Editor, a Settings Editor and the simulation program itself. The Lithology Editor allows the student, instructor or engineer to build a real or imaginary sequence of rock layers, each characterized by its mineralogy, drilling and log responses. The Settings Editor allows the definition of all the operational parameters, ranging from the drilling and wear rates of particular bits in specified rocks to the costs of different procedures. The simulator itself contains an algorithm that determines rate of penetration and rate of wear of the bit as drilling continues. It also determines whether the well kicks or fractures, and assigns various other {open_quotes}accident{close_quotes} conditions. During operation, a depth vs. time curve is displayed, together with a {open_quotes}mud log{close_quotes} showing the rock layers penetrated. If desired, the well may be {open_quotes}logged{close_quotes} casings may be set and pore and fracture pressure gradients may be displayed. During drilling, the total time and cost are shown, together with cost per foot in total and for the current bit run.« less
Geothermal materials development
NASA Astrophysics Data System (ADS)
Kukacka, L. E.
1991-12-01
Advances in the development of new materials, the commercial availabilities of which are essential for the attainment of Hydrothermal Category Level 1 and 2 Objectives, continue to be made in the Geothermal Materials Development Project. Many successes have already been accrued and the results used commercially. In FY-91, utility company sponsored 'full cost' recovery programs based upon materials technology developed in this project were initiated on topics such as condensing heat exchangers, high temperature composites for utility vaults used in district heating systems, and corrosion resistant coatings for use in oil-fired electric generating processes. In FY-91, the DOE/GD-sponsored R&D project was focused on reducing well drilling, fluid transport and energy conversion costs. Specific activities being performed included lightweight CO2-resistant well cements, chemical systems for lost circulation control, thermally conductive and scale resistant protective linear systems, corrosion mitigation in process components at The Geysers, and elastomer-metal bonding systems needed for use in high temperature well drilling and safety related applications.
Results from Testing of Two Rotary Percussive Drilling Systems
NASA Technical Reports Server (NTRS)
Kriechbaum, Kristopher; Brown, Kyle; Cady, Ian; von der Heydt, Max; Klein, Kerry; Kulczycki, Eric; Okon, Avi
2010-01-01
The developmental test program for the MSL (Mars Science Laboratory) rotary percussive drill examined the e ect of various drill input parameters on the drill pene- tration rate. Some of the input parameters tested were drill angle with respect to gravity and percussive impact energy. The suite of rocks tested ranged from a high strength basalt to soft Kaolinite clay. We developed a hole start routine to reduce high sideloads from bit walk. The ongoing development test program for the IMSAH (Integrated Mars Sample Acquisition and Handling) rotary percussive corer uses many of the same rocks as the MSL suite. An additional performance parameter is core integrity. The MSL development test drill and the IMSAH test drill use similar hardware to provide rotation and percussion. However, the MSL test drill uses external stabilizers, while the IMSAH test drill does not have external stabilization. In addition the IMSAH drill is a core drill, while the MSL drill uses a solid powdering bit. Results from the testing of these two related drilling systems is examined.
Vertically operating flight vehicle for drilling and agricultural use
NASA Technical Reports Server (NTRS)
Pabst, W.
1986-01-01
The invention deals with an aircraft which ascends and descends vertically and which is used for recreational aircraft, as well as for drilling and in agriculture. The invention combines the floating effect of a parachute with the helicopter to develop a flight vehicle with multiple uses which go beyond those of contemporary flight vehicles. Both hub mechanisms and thrust power are implemented to achieve this goal. Four designs are described in detail.
Outokumpu Deep Drill Hole: Window to the Precambrian bedrock
NASA Astrophysics Data System (ADS)
Heinonen, Suvi; Kietäväinen, Riikka; Ahonen, Lasse; Kukkonen, Ilmo
2017-04-01
Outokumpu Deep Drill Hole is located in eastern Finland, at latitude 62°43'4'' N and longitude 29°3'43'' E. This 2516 m long and fully cored deep hole has been utilized as a geolaboratory open for researchers worldwide since it was drilled in 2004-2005. The 220 mm diameter drill hole is open without a casing (excluding the uppermost 40 m) and thus provides a direct access to in situ conditions to 2.5 km depth. There is a wide range of wire-line logs carried out by the drilling contractor and later by ICDP (International Continental Scientific Drilling Program) in several logging sessions for geothermal, hydrogeological and deep biosphere studies. Lithology, metamorphism, fluid inclusions, density, magnetic properties, seismic velocities and thermal properties of the drill core have been studied by several international groups. The hole has kept open since the end of drilling enabling future studies to be conducted in it. The drill hole is situated in the southwestern part of the Outokumpu historical mining district famous for its Cu-Co-Zn sulfide deposits. These sulfide deposits are hosted by 1.96 Ga old ophiolitic rock types, known as the Outokumpu assemblage, also penetrated by the deep drill hole at 1314-1515 m depth. Laboratory and in situ petrophysical measurements have provided valuable information about physical properties of the typical rocks of the area that can be utilized in the mineral exploration efforts. The drill site of Outokumpu was chosen based on strong reflectivity observed in the high resolution seismic profiles acquired earlier in the area. Outokumpu Deep Drill Hole revealed that these reflections originate from the acoustic impedance variations caused by the ore hosting Outokumpu assemblage. In 2006, surface seismic reflection and vertical seismic profiling (VSP) data were measured in the drill site, and these data show that not only is Outokumpu assemblage rocks reflective but also water bearing fracture at 965 m depth is observed as a strong reflector. This fracture, as well as other fractures penetrated by the drill hole, contains saline water and gases, mainly methane, nitrogen, hydrogen and helium. Salinity of water in the deeper part (>1000 m) of the drill hole has continuously increased since the drilling. Gas-rich water slowly seeps upward and bubble out at the water table. In total, five different water types have been discerned along the drill hole by geochemical and isotopic methods and residence times up to 58 Ma indicated by the accumulation of noble gases. Microbiological studies in the Outokumpu Deep Drill Hole show that not only do different fracture zones act as places for shift in groundwater chemistry but also in the microbial communities. After a decade of research, Outokumpu drill hole site is geologically well known and thus provides a good environment to test new tools developed for exploration, microbiological or hydrogeological purposes, for example. Geological Survey of Finland is open for new research collaboration projects related to the drill site.
30 CFR 203.36 - Do I keep royalty relief if prices rise significantly?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Oil, Gas, and Sulfur General Royalty Relief for Drilling Ultra-Deep Wells on Leases Not Subject to... drills and begins producing from a qualified phase 2 ultra-deep well in 2008 on a lease issued in 2004 in... which was exceeded. Example 2: Assume that a lessee: (1) Drills and produces from well no.1, a qualified...
CFD modelling of liquid-solid transport in the horizontal eccentric annuli
NASA Astrophysics Data System (ADS)
Sayindla, Sneha; Challabotla, Niranjan Reddy
2017-11-01
In oil and gas drilling operations, different types of drilling fluids are used to transport the solid cuttings in an annulus between drill pipe and well casing. The inner pipe is often eccentric and flow inside the annulus can be laminar or turbulent regime. In the present work, Eulerian-Eulerian granular multiphase CFD model is developed to systematically investigate the effect of the rheology of the drilling fluid type (Newtonian and non-Newtonian), drill pipe eccentricity and inner pipe rotation on the efficiency of cuttings transport. Both laminar and turbulent flow regimes were considered. Frictional pressure drop is computed and compared with the flow loop experimental results reported in the literature. The results confirm that the annular frictional pressure loss in a fully eccentric annulus are significantly lesser than the concentric annulus. Inner pipe rotation improve the efficiency of the cuttings transport in laminar flow regime. Cuttings transport velocity and concentration distribution were analysed to predict the different flow patterns such as stationary bed, moving bed, heterogeneous and homogeneous bed formation.
Disposal of saltwater during well construction--Problems and solutions
Pitt, William A.; Meyer, Frederick W.; Hull, John E.
1977-01-01
The recent interest in the disposal of treated sewage effluent by deep-well injection into salt-water-filled aquifers has increased the need for proper disposal of salt water as more wells are drilled and tested each year.The effects on an unconfined aquifer of the improper disposal of salt water associated with the construction of three wells in southeastern Florida emphasize this need. In two of the wells provisions to prevent and detect salt-water contamination of the unconfined aquifer were practically nonexistent, and in one well extensive provisions were made. Of the three drilling sites the one with proper provision for detection presented no serious problem, as the ground water contaminated by the salt water was easily located and removed. The provisions consisted of drilling a brine-injection well to dispose of salt water discharged in drilling and testing operations, using a closed drilling circulation system to reduce spillage, installing shallow observation wells to map the extent and depth of any salt-water contamination of the shallow aquifer, and installing a dewatering system to remove contaminated ground water.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mehra, S.; Bryce, T.
Sedco Forex has recently completed a new land drilling rig, currently deployed in Gabon, that integrates well construction activities with multiskilling to create cost savings across the board in drilling operations. Historically, operators have produced a comprehensive tender package specifying strictly the type and size of individual rig components and the number of personnel required to drill. In this case, the drilling contractor provides a fit-for-purpose rig, consistent with field location, well profile, operator`s priorities, and local constraints.
30 CFR 250.241 - What must the DPP or DOCD include?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and production activities include: (1) Development drilling; (2) Well test flaring; (3) Installation... production operations. (b) Location. The location and water depth of each of your proposed wells and... proposed well, the surface location of each production facility, and the locations of all associated...
Problem analysis of geotechnical well drilling in complex environment
NASA Astrophysics Data System (ADS)
Kasenov, A. K.; Biletskiy, M. T.; Ratov, B. T.; Korotchenko, T. V.
2015-02-01
The article examines primary causes of problems occurring during the drilling of geotechnical wells (injection, production and monitoring wells) for in-situ leaching to extract uranium in South Kazakhstan. Such a drilling problem as hole caving which is basically caused by various chemical and physical factors (hydraulic, mechanical, etc.) has been thoroughly investigated. The analysis of packing causes has revealed that this problem usually occurs because of insufficient amount of drilling mud being associated with small cross section downward flow and relatively large cross section upward flow. This is explained by the fact that when spear bores are used to drill clay rocks, cutting size is usually rather big and there is a risk for clay particles to coagulate.
Sedimentation, zoning of reservoir rocks in W. Siberian basin oil fields
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kliger, J.A.
1994-02-07
A line pattern of well cluster spacing was chosen in western Siberia because of taiga, marshes, etc., on the surface. The zoning of the oil pools within productive Upper Jurassic J[sub 3] intervals is complicated. This is why until the early 1990s almost each third well drilled in the Shaimsky region on the western edge of the West Siberian basin came up dry. The results of development drilling would be much better if one used some sedimentological relationships of zoning of the reservoir rocks within the oil fields. These natural phenomena are: Paleobasin bathymetry; Distances from the sources of themore » clastic material; and Proximity of the area of deposition. Using the diagram in this article, one can avoid drilling toward areas where the sandstone pinch out, area of argillization of sand-stones, or where the probability of their absence is high.« less
NASA Astrophysics Data System (ADS)
Reyer, D.; Philipp, S. L.
2014-09-01
Information about geomechanical and physical rock properties, particularly uniaxial compressive strength (UCS), are needed for geomechanical model development and updating with logging-while-drilling methods to minimise costs and risks of the drilling process. The following parameters with importance at different stages of geothermal exploitation and drilling are presented for typical sedimentary and volcanic rocks of the Northwest German Basin (NWGB): physical (P wave velocities, porosity, and bulk and grain density) and geomechanical parameters (UCS, static Young's modulus, destruction work and indirect tensile strength both perpendicular and parallel to bedding) for 35 rock samples from quarries and 14 core samples of sandstones and carbonate rocks. With regression analyses (linear- and non-linear) empirical relations are developed to predict UCS values from all other parameters. Analyses focus on sedimentary rocks and were repeated separately for clastic rock samples or carbonate rock samples as well as for outcrop samples or core samples. Empirical relations have high statistical significance for Young's modulus, tensile strength and destruction work; for physical properties, there is a wider scatter of data and prediction of UCS is less precise. For most relations, properties of core samples plot within the scatter of outcrop samples and lie within the 90% prediction bands of developed regression functions. The results indicate the applicability of empirical relations that are based on outcrop data on questions related to drilling operations when the database contains a sufficient number of samples with varying rock properties. The presented equations may help to predict UCS values for sedimentary rocks at depth, and thus develop suitable geomechanical models for the adaptation of the drilling strategy on rock mechanical conditions in the NWGB.
30 CFR 250.413 - What must my description of well drilling design criteria address?
Code of Federal Regulations, 2010 CFR
2010-07-01
... design criteria address? 250.413 Section 250.413 Mineral Resources MINERALS MANAGEMENT SERVICE... drilling design criteria address? Your description of well drilling design criteria must address: (a) Pore... phases, including the anticipated surface pressure used for designing the production string; (g) A single...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michael S. Bruno
This report summarizes the research efforts on the DOE supported research project Percussion Drilling (DE-FC26-03NT41999), which is to significantly advance the fundamental understandings of the physical mechanisms involved in combined percussion and rotary drilling, and thereby facilitate more efficient and lower cost drilling and exploration of hard-rock reservoirs. The project has been divided into multiple tasks: literature reviews, analytical and numerical modeling, full scale laboratory testing and model validation, and final report delivery. Literature reviews document the history, pros and cons, and rock failure physics of percussion drilling in oil and gas industries. Based on the current understandings, a conceptualmore » drilling model is proposed for modeling efforts. Both analytical and numerical approaches are deployed to investigate drilling processes such as drillbit penetration with compression, rotation and percussion, rock response with stress propagation, damage accumulation and failure, and debris transportation inside the annulus after disintegrated from rock. For rock mechanics modeling, a dynamic numerical tool has been developed to describe rock damage and failure, including rock crushing by compressive bit load, rock fracturing by both shearing and tensile forces, and rock weakening by repetitive compression-tension loading. Besides multiple failure criteria, the tool also includes a damping algorithm to dissipate oscillation energy and a fatigue/damage algorithm to update rock properties during each impact. From the model, Rate of Penetration (ROP) and rock failure history can be estimated. For cuttings transport in annulus, a 3D numerical particle flowing model has been developed with aid of analytical approaches. The tool can simulate cuttings movement at particle scale under laminar or turbulent fluid flow conditions and evaluate the efficiency of cutting removal. To calibrate the modeling efforts, a series of full-scale fluid hammer drilling tests, as well as single impact tests, have been designed and executed. Both Berea sandstone and Mancos shale samples are used. In single impact tests, three impacts are sequentially loaded at the same rock location to investigate rock response to repetitive loadings. The crater depth and width are measured as well as the displacement and force in the rod and the force in the rock. Various pressure differences across the rock-indentor interface (i.e. bore pressure minus pore pressure) are used to investigate the pressure effect on rock penetration. For hammer drilling tests, an industrial fluid hammer is used to drill under both underbalanced and overbalanced conditions. Besides calibrating the modeling tool, the data and cuttings collected from the tests indicate several other important applications. For example, different rock penetrations during single impact tests may reveal why a fluid hammer behaves differently with diverse rock types and under various pressure conditions at the hole bottom. On the other hand, the shape of the cuttings from fluid hammer tests, comparing to those from traditional rotary drilling methods, may help to identify the dominant failure mechanism that percussion drilling relies on. If so, encouraging such a failure mechanism may improve hammer performance. The project is summarized in this report. Instead of compiling the information contained in the previous quarterly or other technical reports, this report focuses on the descriptions of tasks, findings, and conclusions, as well as the efforts on promoting percussion drilling technologies to industries including site visits, presentations, and publications. As a part of the final deliveries, the 3D numerical model for rock mechanics is also attached.« less
Predicting emissions from oil and gas operations in the Uinta Basin, Utah.
Wilkey, Jonathan; Kelly, Kerry; Jaramillo, Isabel Cristina; Spinti, Jennifer; Ring, Terry; Hogue, Michael; Pasqualini, Donatella
2016-05-01
In this study, emissions of ozone precursors from oil and gas operations in Utah's Uinta Basin are predicted (with uncertainty estimates) from 2015-2019 using a Monte-Carlo model of (a) drilling and production activity, and (b) emission factors. Cross-validation tests against actual drilling and production data from 2010-2014 show that the model can accurately predict both types of activities, returning median results that are within 5% of actual values for drilling, 0.1% for oil production, and 4% for gas production. A variety of one-time (drilling) and ongoing (oil and gas production) emission factors for greenhouse gases, methane, and volatile organic compounds (VOCs) are applied to the predicted oil and gas operations. Based on the range of emission factor values reported in the literature, emissions from well completions are the most significant source of emissions, followed by gas transmission and production. We estimate that the annual average VOC emissions rate for the oil and gas industry over the 2010-2015 time period was 44.2E+06 (mean) ± 12.8E+06 (standard deviation) kg VOCs per year (with all applicable emissions reductions). On the same basis, over the 2015-2019 period annual average VOC emissions from oil and gas operations are expected to drop 45% to 24.2E+06 ± 3.43E+06 kg VOCs per year, due to decreases in drilling activity and tighter emission standards. This study improves upon previous methods for estimating emissions of ozone precursors from oil and gas operations in Utah's Uinta Basin by tracking one-time and ongoing emission events on a well-by-well basis. The proposed method has proven highly accurate at predicting drilling and production activity and includes uncertainty estimates to describe the range of potential emissions inventory outcomes. If similar input data are available in other oil and gas producing regions, then the method developed here could be applied to those regions as well.
Subsurface Formation Evaluation on Mars: Application of Methods from the Oil Patch
NASA Astrophysics Data System (ADS)
Passey, Q. R.
2006-12-01
The ability to drill 10- to 100-meter deep wellbores on Mars would allow for evaluation of shallow subsurface formations enabling the extension of current interpretations of the geologic history of this planet; moreover, subsurface access is likely to provide direct evidence to determine if water or permafrost is present. Methodologies for evaluating sedimentary rocks using drill holes and in situ sample and data acquisition are well developed here on Earth. Existing well log instruments can measure K, Th, and U from natural spectral gamma-ray emission, compressional and shear acoustic velocities, electrical resistivity and dielectric properties, bulk density (Cs-137 or Co-60 source), photoelectric absorption of gamma-rays (sensitive to the atomic number), hydrogen index from epithermal and thermal neutron scattering and capture, free hydrogen in water molecules from nuclear magnetic resonance, formation capture cross section, temperature, pressure, and elemental abundances (C, O, Si, Ca, H, Cl, Fe, S, and Gd) using 14 MeV pulsed neutron activation more elements possible with supercooled Ge detectors. Additionally, high-resolution wellbore images are possible using a variety of optical, electrical, and acoustic imaging tools. In the oil industry, these downhole measurements are integrated to describe potential hydrocarbon reservoir properties: lithology, mineralogy, porosity, depositional environment, sedimentary and structural dip, sedimentary features, fluid type (oil, gas, or water), and fluid amount (i.e., saturation). In many cases it is possible to determine the organic-carbon content of hydrocarbon source rocks from logs (if the total organic carbon content is 1 wt% or greater), and more accurate instruments likely could be developed. Since Martian boreholes will likely be drilled without using opaque drilling fluids (as generally used in terrestrial drilling), additional instruments can be used such as high resolution direct downhole imaging and other surface contact measurements (such as IR spectroscopy and x-ray fluorescence). However, such wellbores would require modification of some instruments since conventional drilling fluids often provide the coupling of the instrument sensors to the formation (e.g., sonic velocity and galvanic resistivity measurements). The ability to drill wellbores on Mars opens up new opportunities for exploration but also introduces additional technical challenges. Currently it is not known if all existing terrestrial logging instruments can be miniaturized sufficiently for a shallow Mars wellbore, but the existing well logging techniques and instruments provide a solid framework on which to build a Martian subsurface evaluation program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raymond, David W.; Gaither, Katherine N.; Polsky, Yarom
Sandia National Laboratories (Sandia) has a long history in developing compact, mobile, very high-speed drilling systems and this technology could be applied to increasing the rate at which boreholes are drilled during a mine accident response. The present study reviews current technical approaches, primarily based on technology developed under other programs, analyzes mine rescue specific requirements to develop a conceptual mine rescue drilling approach, and finally, proposes development of a phased mine rescue drilling system (MRDS) that accomplishes (1) development of rapid drilling MRDS equipment; (2) structuring improved web communication through the Mine Safety & Health Administration (MSHA) web site;more » (3) development of an improved protocol for employment of existing drilling technology in emergencies; (4) deployment of advanced technologies to complement mine rescue drilling operations during emergency events; and (5) preliminary discussion of potential future technology development of specialized MRDS equipment. This phased approach allows for rapid fielding of a basic system for improved rescue drilling, with the ability to improve the system over time at a reasonable cost.« less
Geomagnetic referencing--the real-time compass for directional drillers
Buchanan, Andrew; Finn, Carol; Love, Jeffrey J.; Worthington, E. William; Lawson, Fraser; Maus, Stefan; Okewunmi, Shola; Poedjono, Benny
2013-01-01
To pinpoint the location and direction of a wellborne, directional driller rely on measurements from accelerometers, magnetometer and gyroscopes. In the past, high-accuracy guidance methods required a halt in drilling to obtain directional measurements. Advances in geomagnetic referencing now allow companies to use real-time data acquired during drilling to accurately potion horizontal wells, decrease well spacing and drill multiple wells from limited surface locations.
Drilling and testing of well 340, Fort Wingate Army Depot, McKinley County, New Mexico
Shomaker, John W.
1969-01-01
The U.S. Geological Survey was requested by Fort Wingate Army Depot to designate a well location, suggest construction and testing procedures, and provide continuing technical advice with respect to the drilling of a new production well. The location was determined during a brief preliminary study of the Depot's water supply which is summarized in a report transmitted to the Depot in April of 1968, and the Geological Survey's suggestions for construction and testing are contained in the specifications written by the Post Engineer at the Depot as part of the well-drilling contract. A representative of the the Geological Survey was present during most of the drilling and testing of the well.
Drilling and abandonment preparation of CO₂ storage wells – Experience from the Ketzin pilot site
Prevedel, Bernhard; Martens, Sonja; Norden, Ben; ...
2014-12-31
At Ketzin, located west of Berlin, the GFZ German Centre for Geosciences is operating Europe's largest CO₂ research storage site. This pilot site has been developed since 2004 and is comprised of one combined injection/observation well and four monitoring wells. From June 2008 to August 2013, a total of 67 kilotons of CO₂ were safely injected into the sandstone units of the Upper Triassic Stuttgart Formation in a depth between 630 to 650 m. The paper discusses the well designs and lessons learned in drilling engineering and operations. The abandonment phase started in Ketzin with the first plug cementation ofmore » the observation well Ktzi 202 shortly after shut-in of CO₂ injection. The experience with the first CO₂ well killing operation will be reviewed.« less
Future scientific drilling in the Arctic Ocean: Key objectives, areas, and strategies
NASA Astrophysics Data System (ADS)
Stein, R.; Coakley, B.; Mikkelsen, N.; O'Regan, M.; Ruppel, C.
2012-04-01
In spite of the critical role of the Arctic Ocean in climate evolution, our understanding of the short- and long-term paleoceanographic and paleoclimatic history through late Mesozoic-Cenozoic times, as well as its plate-tectonic evolution, remains behind that from the other world's oceans. This lack of knowledge is mainly caused by the major technological/logistic problems in reaching this permanently ice-covered region with normal research vessels and in retrieving long and undisturbed sediment cores. With the Arctic Coring Expedition - ACEX (or IODP Expedition 302), the first Mission Specific Platform (MSP) expedition within IODP, a new era in Arctic research began (Backman, Moran, Mayer, McInroy et al., 2006). ACEX proved that, with an intensive ice-management strategy, successful scientific drilling in the permanently ice-covered central Arctic Ocean is possible. ACEX is certainly a milestone in Arctic Ocean research, but - of course - further drilling activities are needed in this poorly studied ocean. Furthermore, despite the success of ACEX fundamental questions related to the long- and short-term climate history of the Arctic Ocean during Mesozoic-Cenozoic times remain unanswered. This is partly due to poor core recovery during ACEX and, especially, because of a major mid-Cenozoic hiatus in this single record. Since ACEX, a series of workshops were held to develop a scientific drilling strategy for investigating the tectonic and paleoceanographic history of the Arctic Ocean and its role in influencing the global climate system: - "Arctic Ocean History: From Speculation to Reality" (Bremerhaven/Germany, November 2008); - "Overcoming barriers to Arctic Ocean scientific drilling: the site survey challenge" (Copenhagen/Denmark, November 2011); - Circum-Arctic shelf/upper continental slope scientific drilling workshop on "Catching Climate Change in Progress" (San Francisco/USA, December 2011); - "Coordinated Scientific Drilling in the Beaufort Sea: Addressing Past, Present and Future Changes in Arctic Terrestrial and Marine Systems" (Kananaskis, Alberta/Canada, February 2012). During these workshops, key areas and key scientific themes as well as drilling and site-survey strategies were discussed. Major scientific themes for future Arctic drilling will include: - The Arctic Ocean during the transition from greenhouse to icehouse conditions and millennial scale climate changes; - Physical and chemical changes of the evolving Polar Ocean and Arctic gateways; - Impact of Pleistocene/Holocene warming and sea-level rise on upper continental slope and shelf gas hydrates and on shelf permafrost; - Land-ocean interactions; - Tectonic evolution and birth of the Arctic Ocean basin: Arctic ridges, sea floor spreading and global lithosphere processes. When thinking about future Arctic drilling, it should be clearly emphasized that for the precise planning of future Arctic Ocean drilling campaigns, including site selection, evaluation of proposed drill sites for safety and environmental protection, etc., comprehensive site survey data are needed first. This means that the development of a detailed site survey strategy is a major challenge for the coming years. Here, an overview of perspectives and plans for future Arctic Ocean drilling will be presented.
Ground-water exploration in the Bosque del Apache Grant, Socorro County, New Mexico
Cooper, James B.
1968-01-01
Test drilling along the Rio Grande in the Bosque del Apache Grant in Socorro County, New Mexico has shown that the area is hydrologically complex and that the quality of the ground water varies from saline to fresh within short distances both laterally and vertically. Nearly all of the riverside land in the Grant is occupied by the migratory waterfowl refuge of the Bosque del Apache National Wildlife Refuge. Potable and near-potable water is obtained from 12 wells in this area that tap sand and gravel, and the wells are capable of yielding 1,000 gallons per minute or more. Stallion Range Center, a military installation on the White Sands Missile Range, about 15 miles east of =he waterfowl refuge, needs about 100,000 gallons per day of potable water. Potable water in large quantities is not known to be available at a location closer to the Center than the refuge area. The Fish and Wildlife Service, which operates the waterfowl refuge, gave permission to White Sands Missile Range to test drill and to develop a supply well in certain areas along the Rio Grande outside the managed lands of the refuge. The U.S. Geological Survey was then asked by White Sands Missile Range to choose locations for test drilling and to monitor drilling and testing of the wells. Between 1963 and 1967 test wells were drilled and a suitable location for a supply well as found. The well would be about 250 feet deep and would tap a body of potable water that is about 100 feet in thickness and is thought to underlie an area of at least 5 square miles. This report contains diagrammatic sections that show the lateral and vertical relation of waters of different quality along the Rio Grande in a part of the Bosque del Apache Grant. Basic data are given in tables; they include records of 7 test wells and 12 high-yield supply wells, and 52 chemical analyses of ground water from the wells.
Rapid gas development in the Fayetteville shale basin, Arkansas
Advances in drilling and extraction of natural gas have resulted in rapid expansion of wells in shale basins. The rate of gas well installation in the Fayetteville shale is 774 wells a year since 2005 with thousands more planned. The Fayetteville shale covers 23,000 km2 although ...
Ecological risks of shale oil and gas development to wildlife, aquatic resources and their habitats
Brittingham, Margaret C.; Maloney, Kelly O.; Farag, Aïda M.; Harper, David D.; Bowen, Zachary H.
2014-01-01
Technological advances in hydraulic fracturing and horizontal drilling have led to the exploration and exploitation of shale oil and gas both nationally and internationally. Extensive development of shale resources has occurred within the United States over the past decade, yet full build out is not expected to occur for years. Moreover, countries across the globe have large shale resources and are beginning to explore extraction of these resources. Extraction of shale resources is a multistep process that includes site identification, well pad and infrastructure development, well drilling, high-volume hydraulic fracturing and production; each with its own propensity to affect associated ecosystems. Some potential effects, for example from well pad, road and pipeline development, will likely be similar to other anthropogenic activities like conventional gas drilling, land clearing, exurban and agricultural development and surface mining (e.g., habitat fragmentation and sedimentation). Therefore, we can use the large body of literature available on the ecological effects of these activities to estimate potential effects from shale development on nearby ecosystems. However, other effects, such as accidental release of wastewaters, are novel to the shale gas extraction process making it harder to predict potential outcomes. Here, we review current knowledge of the effects of high-volume hydraulic fracturing coupled with horizontal drilling on terrestrial and aquatic ecosystems in the contiguous United States, an area that includes 20 shale plays many of which have experienced extensive development over the past decade. We conclude that species and habitats most at risk are ones where there is an extensive overlap between a species range or habitat type and one of the shale plays (leading to high vulnerability) coupled with intrinsic characteristics such as limited range, small population size, specialized habitat requirements, and high sensitivity to disturbance. Examples include core forest habitat and forest specialists, sagebrush habitat and specialists, vernal pond inhabitants and stream biota. We suggest five general areas of research and monitoring that could aid in development of effective guidelines and policies to minimize negative impacts and protect vulnerable species and ecosystems: (1) spatial analyses, (2) species-based modeling, (3) vulnerability assessments, (4) ecoregional assessments, and (5) threshold and toxicity evaluations.
Ecological risks of shale oil and gas development to wildlife, aquatic resources and their habitats.
Brittingham, Margaret C; Maloney, Kelly O; Farag, Aïda M; Harper, David D; Bowen, Zachary H
2014-10-07
Technological advances in hydraulic fracturing and horizontal drilling have led to the exploration and exploitation of shale oil and gas both nationally and internationally. Extensive development of shale resources has occurred within the United States over the past decade, yet full build out is not expected to occur for years. Moreover, countries across the globe have large shale resources and are beginning to explore extraction of these resources. Extraction of shale resources is a multistep process that includes site identification, well pad and infrastructure development, well drilling, high-volume hydraulic fracturing and production; each with its own propensity to affect associated ecosystems. Some potential effects, for example from well pad, road and pipeline development, will likely be similar to other anthropogenic activities like conventional gas drilling, land clearing, exurban and agricultural development and surface mining (e.g., habitat fragmentation and sedimentation). Therefore, we can use the large body of literature available on the ecological effects of these activities to estimate potential effects from shale development on nearby ecosystems. However, other effects, such as accidental release of wastewaters, are novel to the shale gas extraction process making it harder to predict potential outcomes. Here, we review current knowledge of the effects of high-volume hydraulic fracturing coupled with horizontal drilling on terrestrial and aquatic ecosystems in the contiguous United States, an area that includes 20 shale plays many of which have experienced extensive development over the past decade. We conclude that species and habitats most at risk are ones where there is an extensive overlap between a species range or habitat type and one of the shale plays (leading to high vulnerability) coupled with intrinsic characteristics such as limited range, small population size, specialized habitat requirements, and high sensitivity to disturbance. Examples include core forest habitat and forest specialists, sagebrush habitat and specialists, vernal pond inhabitants and stream biota. We suggest five general areas of research and monitoring that could aid in development of effective guidelines and policies to minimize negative impacts and protect vulnerable species and ecosystems: (1) spatial analyses, (2) species-based modeling, (3) vulnerability assessments, (4) ecoregional assessments, and (5) threshold and toxicity evaluations.
The installation of a sub sea floor observatory using the sea floor drill rig MeBo
NASA Astrophysics Data System (ADS)
Wefer, G.; Freudenthal, T.; Kopf, A.
2012-04-01
Sea floor drill rigs that can be deployed from standard research vessels are bridging the gap between dedicated drill ships that are used for deep drillings in the range of several hundred meters below sea floor and conventional sampling tools like gravity corers, piston corer or dredges that only scratch the surface of the sea floor. A major advantage of such robotic drill rigs is that the drilling action is conducted from a stable platform at the sea bed independent of any ship movements due to waves, wind or currents. At the MARUM Center for Marine Environmental Sciences at the University of Bremen we developed the sea bed drill rig MeBo that can be deployed from standard research vessels. The drill rig is deployed on the sea floor and controlled from the vessel. Drilling tools for coring the sea floor down to 70 m can be stored on two magazines on the rig. A steel-armoured umbilical is used for lowering the rig to the sea bed in water depths up to 2000 m in the present system configuration. It was successfully operated on ten expeditions since 2005 and drilled more than 1000 m in different types of geology including hemipelagic mud, glacial till as well as sedimentary and crystalline rocks. MeBo boreholes be equipped with sensors and used for long term monitoring are planned. Depending on the scientific demands, a MeBoCORK monitoring system will allow in situ measurements of eg. temperature and pressure. The "MeBoCORK" will be equipped with data loggers and data transmission interface for reading out the collected data from the vessel. By additional payload installation on the MeBoCORK with an ROV it will be possible to increase the energy capacity as well as to conduct fluid sampling in the bore hole for geochemical analyses. It is planned to install a prototype of this additional payload with the MARUM ROV QUEST4000M during the following R/V SONNE cruise in July 2012.
43 CFR 3261.18 - Do I need to file a bond with BLM before I build a well pad or drill a well?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Do I need to file a bond with BLM before I...) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.18 Do I need to file a bond with BLM before I build a well pad or drill a well? Before starting any operation, you must: (a) File with BLM...
Habitat loss and modification due to gas development in the Fayetteville shale.
Moran, Matthew D; Cox, A Brandon; Wells, Rachel L; Benichou, Chloe C; McClung, Maureen R
2015-06-01
Hydraulic fracturing and horizontal drilling have become major methods to extract new oil and gas deposits, many of which exist in shale formations in the temperate deciduous biome of the eastern United States. While these technologies have increased natural gas production to new highs, they can have substantial environmental effects. We measured the changes in land use within the maturing Fayetteville Shale gas development region in Arkansas between 2001/2002 and 2012. Our goal was to estimate the land use impact of these new technologies in natural gas drilling and predict future consequences for habitat loss and fragmentation. Loss of natural forest in the gas field was significantly higher compared to areas outside the gas field. The creation of edge habitat, roads, and developed areas was also greater in the gas field. The Fayetteville Shale gas field fully developed about 2% of the natural habitat within the region and increased edge habitat by 1,067 linear km. Our data indicate that without shale gas activities, forest cover would have increased slightly and edge habitat would have decreased slightly, similar to patterns seen recently in many areas of the southern U.S. On average, individual gas wells fully developed about 2.5 ha of land and modified an additional 0.5 ha of natural forest. Considering the large number of wells drilled in other parts of the eastern U.S. and projections for new wells in the future, shale gas development will likely have substantial negative effects on forested habitats and the organisms that depend upon them.
Synthesis of engineering designs of drilling facilities
NASA Astrophysics Data System (ADS)
Porozhsky, K.
2018-03-01
The article sets forth key principles of engineering of drilling equipment based on successive analysis of the goals of the production method, technologies of its implementation and conditions of mineral mining using a new approach to systematization of drilling methods. Potential advancement in the technologies and equipment of drilling is illustrated in terms of oil-well drilling.
NASA Astrophysics Data System (ADS)
Darmawan, Tofiq Dwiki; Priadythama, Ilham; Herdiman, Lobes
2018-02-01
Welding and drilling are main processes of making chair frame from metal material. Commonly, chair frame construction includes many arcs which bring difficulties for its welding and drilling process. In UNS industrial engineering integrated practicum there are welding fixtures which use to fixing frame component position for welding purpose. In order to achieve exact holes position for assembling purpose, manual drilling processes were conducted after the frame was joined. Unfortunately, after it was welded the frame material become hard and increase drilling tools wear rate as well as reduce holes position accuracy. The previous welding fixture was not equipped with clamping system and cannot accommodate drilling process. To solve this problem, our idea is to reorder the drilling process so that it can be execute before welding. Thus, this research aims to propose conceptual design of modular fixture which can integrate welding and drilling process. We used Generic Product Development Process to address the design concept. We collected design requirements from 3 source, jig and fixture theoretical concepts, user requirements, and clamping part standards. From 2 alternatives fixture tables, we propose the first which equipped with mounting slots instead of holes. We test the concept by building a full sized prototype and test its works by conducting welding and drilling of a student chair frame. Result from the welding and drilling trials showed that the holes are on precise position after welding. Based on this result, we conclude that the concept can be a consideration for application in UNS Industrial Engineering Integrated Practicum.
30 CFR 250.1604 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... moving equipment such as a well-drilling, well-completion, or well-workover rig or associated equipment..., platform age, and previous stresses. (f) Traveling-block safety device. All drilling units being used for...
30 CFR 250.1604 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... moving equipment such as a well-drilling, well-completion, or well-workover rig or associated equipment..., platform age, and previous stresses. (f) Traveling-block safety device. All drilling units being used for...
30 CFR 250.1604 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... moving equipment such as a well-drilling, well-completion, or well-workover rig or associated equipment..., platform age, and previous stresses. (f) Traveling-block safety device. All drilling units being used for...
30 CFR 250.401 - What must I do to keep wells under control?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations... precautions to keep wells under control at all times. You must: (a) Use the best available and safest drilling...; (b) Have a person onsite during drilling operations who represents your interests and can fulfill...
Wellbore stability analysis and its application in the Fergana basin, central Asia
NASA Astrophysics Data System (ADS)
Chuanliang, Yan; Jingen, Deng; Baohua, Yu; Hailong, Liu; Fucheng, Deng; Zijian, Chen; Lianbo, Hu; Haiyan, Zhu; Qin, Han
2014-02-01
Wellbore instability is one of the major problems hampering the drilling speed in the Fergana basin. Comprehensive analysis of the geological and engineering data in this area indicates that the Fergana basin is characterized by high in situ stress and plenty of natural fractures, especially in the formations which are rich in bedding structure and have several high-pressure systems. Complex accidents such as wellbore collapse, sticking, well kick and lost circulation happen frequently. Tests and theoretical analysis reveals that the wellbore instability in the Fergana basin was influenced by multiple interactive mechanisms dominated by the instability of the bedding shale. Selecting a proper drilling fluid density and improving the sealing characteristic of the applied drilling fluid is the key to preventing wellbore instability in the Fergana basin. The mechanical mechanism of wellbore instability in the Fergana basin was analysed and a method to determine the proper drilling fluid density was proposed. The research results were successfully used to guide the drilling work of the Jida-4 well; compared with the Jida-3 well, the drilling cycle of the Jida-4 well was reduced by 32%.
DAME: planetary-prototype drilling automation.
Glass, B; Cannon, H; Branson, M; Hanagud, S; Paulsen, G
2008-06-01
We describe results from the Drilling Automation for Mars Exploration (DAME) project, including those of the summer 2006 tests from an Arctic analog site. The drill hardware is a hardened, evolved version of the Advanced Deep Drill by Honeybee Robotics. DAME has developed diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The DAME drill automation tested from 2004 through 2006 included adaptively controlled drilling operations and the downhole diagnosis of drilling faults. It also included dynamic recovery capabilities when unexpected failures or drilling conditions were discovered. DAME has developed and tested drill automation software and hardware under stressful operating conditions during its Arctic field testing campaigns at a Mars analog site.
DAME: Planetary-Prototype Drilling Automation
NASA Astrophysics Data System (ADS)
Glass, B.; Cannon, H.; Branson, M.; Hanagud, S.; Paulsen, G.
2008-06-01
We describe results from the Drilling Automation for Mars Exploration (DAME) project, including those of the summer 2006 tests from an Arctic analog site. The drill hardware is a hardened, evolved version of the Advanced Deep Drill by Honeybee Robotics. DAME has developed diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The DAME drill automation tested from 2004 through 2006 included adaptively controlled drilling operations and the downhole diagnosis of drilling faults. It also included dynamic recovery capabilities when unexpected failures or drilling conditions were discovered. DAME has developed and tested drill automation software and hardware under stressful operating conditions during its Arctic field testing campaigns at a Mars analog site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fairbank, Brian D.; Smith, Nicole
The Crump Geyser Exploration and Drilling Project – High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling ran from January 29, 2010 to September 30, 2013. During Phase 1 of the project, collection of all geophysical surveys was completed as outlined in the Statement of Project Objectives. In addition, a 5000-foot full sized exploration well was drilled by Ormat, and preexisting drilling data was discovered for multiple temperature gradient wells within the project area. Three dimensional modeling and interpretation of results from the geophysical surveys and drilling data gave confidence to move to the project into Phase 2more » drilling. Geological and geophysical survey interpretations combined with existing downhole temperature data provided an ideal target for the first slim-hole drilled as the first task in Phase 2. Slim-hole 35-34 was drilled in September 2011 and tested temperature, lithology, and permeability along the primary range-bounding fault zone near its intersection with buried northwest-trending faults that have been identified using geophysical methods. Following analysis of the results of the first slim-hole 35-34, the second slim hole was not drilled and subsequent project tasks, including flowing differential self-potential (FDSP) surveys that were designed to detail the affect of production and injection on water flow in the shallow aquifer, were not completed. NGP sold the Crump project to Ormat in August 2014, afterwards, there was insufficient time and interest from Ormat available to complete the project objectives. NGP was unable to continue managing the award for a project they did not own due to liability issues and Novation of the award was not a viable option due to federal award timelines. NGP submitted a request to mutually terminate the award on February 18, 2015. The results of all of the technical surveys and drilling are included in this report. Fault interpretations from surface geology, aeromag, seismic, and gravity data sets are in good agreement, illustrating two or more major range-bounding faults and buried northwest trending faults. The intersections of these fault systems provide the primary targets for drilling.« less
Nathenson, Manuel; Urban, Thomas C.; Covington, Harry R.
2014-01-01
For purposes of defining the thermal anomaly for the geothermal system, temperature gradients are calculated over long depth intervals on the basis of the appearance of reasonable linear segments on a temperature versus plot depth. Temperature versus depth data for some drill holes can be represented by a single gradient, whereas others require multiple gradients to match the data. Data for some drill holes clearly reflect vertical flows of water in the formation surrounding the drill holes, and water velocities are calculated for these drill holes. Within The Narrows area, temperature versus depth data show reversals at different depth in different drill holes. In the main thermal area, temperatures in intermediate-depth drill holes vary approximately linearly but with very high values of temperature gradient. Temperature gradients on a map of the area can be reasonable divided into a large area of regional gradients and smaller areas defining the thermal anomalies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aswad, Z.A.R.; Al-Hadad, S.M.S.
1983-03-01
The powerful Rosenbrock search technique, which optimizes both the search directions using the Gram-Schmidt procedure and the step size using the Fibonacci line search method, has been used to optimize the drilling program of an oil well drilled in Bai-Hassan oil field in Kirkuk, Iran, using the twodimensional drilling model of Galle and Woods. This model shows the effect of the two major controllable variables, weight on bit and rotary speed, on the drilling rate, while considering other controllable variables such as the mud properties, hydrostatic pressure, hydraulic design, and bit selection. The effect of tooth dullness on the drillingmore » rate is also considered. Increasing the weight on the drill bit with a small increase or decrease in ratary speed resulted in a significant decrease in the drilling cost for most bit runs. It was found that a 48% reduction in this cost and a 97-hour savings in the total drilling time was possible under certain conditions.« less
Notes on the uwainat oil rim development, Maydan Mahzam and Bul Hanine Fields, offshore Qatar
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hamam, K.A.
As a result of reservoir simulation studies of the Uwainat reservoirs (Maydan Mahzam and Bul Hanine Fields), drilling to the Uwainat oil rim target became very ''tight'' with a very limited vertical tolerance. To achieve drilling to the tight target requires a precise position of the well at the top of the Lower Arab IV reservoir (a reliable marker) and an accurate isochore of the Lower Arab IV - Uwainat. The discussion shows that the level of accuracy needed in determining both the actual subsea well position and in constructing the depth contours of the reservoirs is extremely high.
78 FR 8575 - Ocean Energy Safety Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... energy safety, including but not limited to, drilling and workplace safety, well intervention and containment, and oil spill response. The Committee will also facilitate collaborative research and development...
Compact drilling and sample system
NASA Technical Reports Server (NTRS)
Gillis-Smith, Greg R.; Petercsak, Doug
1998-01-01
The Compact Drilling and Sample System (CDSS) was developed to drill into terrestrial, cometary, and asteroid material in a cryogenic, vacuum environment in order to acquire subsurface samples. Although drills were used by the Apollo astronauts some 20 years ago, this drill is a fraction of the mass and power and operates completely autonomously, able to drill, acquire, transport, dock, and release sample containers in science instruments. The CDSS has incorporated into its control system the ability to gather science data about the material being drilled by measuring drilling rate per force applied and torque. This drill will be able to optimize rotation and thrust in order to achieve the highest drilling rate possible in any given sample. The drill can be commanded to drill at a specified force, so that force imparted on the rover or lander is limited. This paper will discuss the cryo dc brush motors, carbide gears, cryogenic lubrication, quick-release interchangeable sampling drill bits, percussion drilling and the control system developed to achieve autonomous, cryogenic, vacuum, lightweight drilling.
Vafi, Kourosh; Brandt, Adam
2016-07-19
This paper introduces GHGfrack, an open-source engineering-based model that estimates energy consumption and associated GHG emissions from drilling and hydraulic fracturing operations. We describe verification and calibration of GHGfrack against field data for energy and fuel consumption. We run GHGfrack using data from 6927 wells in Eagle Ford and 4431 wells in Bakken oil fields. The average estimated energy consumption in Eagle Ford wells using lateral hole diameters of 8 (3)/4 and 6 (1)/8 in. are 2.25 and 2.73 TJ/well, respectively. The average estimated energy consumption in Bakken wells using hole diameters of 6 in. for horizontal section is 2.16 TJ/well. We estimate average greenhouse gas (GHG) emissions of 419 and 510 tonne of equivalent CO2 per well (tonne of CO2 eq/well) for the two aforementioned assumed geometries in Eagle Ford, respectively, and 417 tonne of CO2 eq/well for the case of Bakken. These estimates are limited only to GHG emissions from combustion of diesel fuel to supply energy only for rotation of drill string, drilling mud circulation, and fracturing pumps. Sensitivity analysis of the model shows that the top three key variables in driving energy intensity in drilling are the lateral hole diameter, drill pipe internal diameter, and mud flow rate. In hydraulic fracturing, the top three are lateral casing diameter, fracturing fluid volume, and length of the lateral.
NASA Astrophysics Data System (ADS)
Boswell, R. M.; Collett, T. S.; Frye, M.; McConnell, D.; Shedd, W.; Shelander, D.; Dai, J.; Mrozewski, S.; Guerin, G.; Cook, A.; Dufrene, R.; Godfriaux, P. D.; Roy, R.; Jones, E.
2009-12-01
The Gulf of Mexico gas hydrates Joint Industry Project (the JIP), a cooperative research program between the US Department of Energy and an international industrial consortium under the leadership of Chevron, conducted its “Leg II” logging-while-drilling operations in April and May of 2009. JIP Leg II was intended to expand the existing JIP work from previous emphasis on fine-grained sedimentary systems to the direct evaluation of gas hydrate in sand-dominated reservoirs. The selection of the locations for the JIP Leg II drilling were the result of a geological and geophysical prospecting approach that integrated direct geophysical evidence of gas hydrate-bearing strata with evidence of gas sourcing and migration and occurrence of sand reservoirs within the gas hydrate stability zone. Logging-while-drilling operations included the drilling of seven wells at three sites. The expedition experienced minimal operational problems with the advanced LWD tool string, and successfully managed a number of shallow drilling challenges, including borehole breakouts, and shallow gas and water flows. Two wells drilled in Walker Ridge block 313 (WR-313) confirmed the pre-drill predictions by discovering gas hydrates at high saturations in multiple sand horizons with reservoir thicknesses up to 50 ft. In addition, drilling in WR-313 discovered a thick, strata-bound interval of grain-displacing gas hydrate in shallow fine-grained sediments. Two of three wells drilled in Green Canyon block 955 (GC-955) confirmed the pre-drill prediction of extensive sand occurrence with gas hydrate fill along the crest of a structure with positive indications of gas source and migration. In particular, well GC955-H discovered ~100 ft of gas hydrate in sand at high saturations. Two wells drilled in Alaminos Canyon block 21 (AC-21) confirmed the pre-drill prediction of potential extensive occurrence of gas hydrates in shallow sand reservoirs at low to moderate saturations; however, further data collection and analyses at AC-21 will be needed to better understand the nature of the pore filling material. JIP Leg II fully met its scientific objectives with the collection of abundant high-quality data from gas hydrate bearing sands in the Gulf of Mexico. Ongoing work within the JIP will enable further validation of the geophysical and geological methods used to predict the occurrence of gas hydrate. Expedition results will also support the selection of locations for future JIP drilling, logging and coring operations.
Impact of exploratory wells, offshore Florida: A biological assessment
Dustan, Phillip A.; Lidz, Barbara H.; Shinn, Eugene A.
1991-01-01
Seven offshore exploratory oil well sites were examined in an effort to determine the ecological impact of exploratory drilling on the subtropical marine ecosystems of southern Florida, including seagrass beds and coral reefs. The time since drilling ranged from 2 to 29 years; water depths varied between 5 and 70 m. The major long-term ecological impact observed at these sites ranged from the creation of "artificial-reef" conditions to the physical destruction of hardbottom habitat that had not recovered in 29 years. Long-term ecological perturbation appeared to be limited to physical destruction and the deposition of drilling debris, which provided substratum for settling organisms. Significant deposits of drill muds or cuttings were not encountered at any of the sites, and there was no evidence of ecological damage from cuttings or drill muds. The results of this study pertain only to exploratory drilling that, unlike production wells that remain in place for tens of years, is a one-time perturbation to the habitat.
30 CFR 250.415 - What must my casing and cementing programs include?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.415 What must my casing and... in Deep Water Wells (incorporated by reference as specified in § 250.198), if you drill a well in...
30 CFR 250.468 - What well records am I required to submit?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations... drilling operations in the GOM OCS Region, you must submit form MMS-133, Well Activity Report, to the District Manager on a weekly basis. (c) For drilling operations in the Pacific or Alaska OCS Regions, you...
50 CFR 18.126 - What does a Letter of Authorization allow?
Code of Federal Regulations, 2013 CFR
2013-10-01
... Oil and Gas Exploration, Development, and Production Activities in the Beaufort Sea and Adjacent...) Developing oil fields and associated activities; (4) Drilling production wells and performing production support operations; (5) Conducting environmental monitoring activities associated with exploration...
50 CFR 18.126 - What does a Letter of Authorization allow?
Code of Federal Regulations, 2011 CFR
2011-10-01
... Oil and Gas Exploration, Development, and Production Activities in the Beaufort Sea and Adjacent...) Developing oil fields and associated activities; (4) Drilling production wells and performing production support operations; (5) Conducting environmental monitoring activities associated with exploration...
50 CFR 18.126 - What does a Letter of Authorization allow?
Code of Federal Regulations, 2012 CFR
2012-10-01
... Oil and Gas Exploration, Development, and Production Activities in the Beaufort Sea and Adjacent...) Developing oil fields and associated activities; (4) Drilling production wells and performing production support operations; (5) Conducting environmental monitoring activities associated with exploration...
DOE Office of Scientific and Technical Information (OSTI.GOV)
De La Fosse, P.H.; Black, A.D.; DiBona, B.G.
1983-01-01
A major limitation of downhole mud motors for geothermal drilling, as well as straight-hole oil and gas drilling, is the bearing section. Reduced bearing life results from the inability to seal a lubricant in the bearing pack. A reliable rotary seal will extend the bearing life and will allow high pressure drops across the bit for improved bottomhole cleaning and increased drilling rate. This paper summarizes the results of a six-year program funded by the U.S. Department of Energy/Division of Geothermal Energy to develop a sealed bearing pack for use with downhole motors in geothermal applications. Descriptions of the Sealmore » Test Machine, Lubricant Test Machine and Bearing Pack Test Facility are presented. Summaries of all seal tests, lubricant tests and bearing pack tests are provided; and a comprehensive program bibliography is presented.« less
Test wells T21, T22, and T25, White Sands Missile Range, Dona Ana County, New Mexico
Myers, R.G.
1983-01-01
Three test wells, T21, T22, and T25, were drilled at White Sands Missile Range in south-central New Mexico as part of a joint military program sponsored by the U.S. Army in September 1982. T21 and T22 were drilled as observation wells for two old landfills. T25 was drilled as an exploratory hole to obtain lithologic and borehole-geophysical data in the vicinity of the proposed replacement well for Supply Well 15. Information obtained from these wells includes borehole-geophysical and driller's logs.
40 CFR 147.2902 - Definitions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... aquifer. USDW—underground source of drinking water. Well—a bored, drilled, or driven shaft, or a dug hole... fluids through a bored, drilled, or driven well; or through a dug well, where the depth of the dug well...
40 CFR 147.2902 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... aquifer. USDW—underground source of drinking water. Well—a bored, drilled, or driven shaft, or a dug hole... fluids through a bored, drilled, or driven well; or through a dug well, where the depth of the dug well...
40 CFR 147.2902 - Definitions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... aquifer. USDW—underground source of drinking water. Well—a bored, drilled, or driven shaft, or a dug hole... fluids through a bored, drilled, or driven well; or through a dug well, where the depth of the dug well...
40 CFR 147.2902 - Definitions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... aquifer. USDW—underground source of drinking water. Well—a bored, drilled, or driven shaft, or a dug hole... fluids through a bored, drilled, or driven well; or through a dug well, where the depth of the dug well...
Drilling and blasting parameters in sublevel caving in Sheregesh mine
NASA Astrophysics Data System (ADS)
Eremenko, AA; Filippov, VN; Konurin, AI; Khmelinin, AP; Baryshnikov, DV; Khristolyubov, EA
2018-03-01
The factors that influence geomechanical state of rock mass in Sheregesh Mine are determined. The authors discuss a variant of geotechnology with fan drilling. The drill-hole patterns and drilling-and-blasting parameters are presented. The revealed causes of low-quality fragmentation of rocks include the presence of closed and open fractures at different distances from drill-hole mouths, both in case of rings and fans, as well as the blocking of drill-holes with rocks.
NASA Astrophysics Data System (ADS)
Bég, O. Anwar; Espinoza, D. E. Sanchez; Kadir, Ali; Shamshuddin, MD.; Sohail, Ayesha
2018-04-01
An experimental study of the rheology and lubricity properties of a drilling fluid is reported, motivated by applications in highly deviated and extended reach wells. Recent developments in nanofluids have identified that the judicious injection of nano-particles into working drilling fluids may resolve a number of issues including borehole instability, lost circulation, torque and drag, pipe sticking problems, bit balling and reduction in drilling speed. The aim of this article is, therefore, to evaluate the rheological characteristics and lubricity of different nano-particles in water-based mud, with the potential to reduce costs via a decrease in drag and torque during the construction of highly deviated and ERD wells. Extensive results are presented for percentage in torque variation and coefficient of friction before and after aging. Rheology is evaluated via apparent viscosity, plastic viscosity and gel strength variation before and after aging for water-based muds (WBM). Results are included for silica and titanium nano-particles at different concentrations. These properties were measured before and after aging the mud samples at 80 °C during 16 h at static conditions. The best performance was shown with titanium nano-particles at a concentration of 0.60% (w/w) before aging.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Su, Jiann-Cherng; Raymond, David W.; Prasad, Somuri V.
Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two- phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phasemore » I and evaluating performance of the materials and designs at high- operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for user in the driller's toolbox.« less
Advanced Percussive Drilling Technology for Geothermal Exploration and Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Su, Jiann; Raymond, David; Prasad, Somuri
Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phasemore » I and evaluating performance of the materials and designs at high operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for use in the driller’s toolbox.« less
Method and system for determining formation porosity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pittman, R.W.; Hermes, C.E.
1977-12-27
The invention discloses a method and/or system for measuring formation porosity from drilling response. It involves measuring a number of drilling parameters and includes determination of tooth dullness as well as determining a reference torque empirically. One of the drilling parameters is the torque applied to the drill string.
30 CFR 250.617 - Blowout preventer system testing, records, and drills.
Code of Federal Regulations, 2014 CFR
2014-07-01
... drills. 250.617 Section 250.617 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Gas Well-Workover Operations § 250.617 Blowout preventer system testing, records, and drills. (a) BOP... disconnecting a pressure seal in the assembly, the affected seal will be pressure tested. (c) Drills. All...
30 CFR 250.616 - Blowout preventer system testing, records, and drills.
Code of Federal Regulations, 2012 CFR
2012-07-01
... drills. 250.616 Section 250.616 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Gas Well-Workover Operations § 250.616 Blowout preventer system testing, records, and drills. (a) BOP... disconnecting a pressure seal in the assembly, the affected seal will be pressure tested. (c) Drills. All...
30 CFR 250.617 - Blowout preventer system testing, records, and drills.
Code of Federal Regulations, 2013 CFR
2013-07-01
... drills. 250.617 Section 250.617 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Gas Well-Workover Operations § 250.617 Blowout preventer system testing, records, and drills. (a) BOP... disconnecting a pressure seal in the assembly, the affected seal will be pressure tested. (c) Drills. All...
30 CFR 250.462 - What are the requirements for well-control drills?
Code of Federal Regulations, 2011 CFR
2011-07-01
... drills? 250.462 Section 250.462 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Other Drilling Requirements § 250.462 What are the requirements...
Dillon, William P.
1983-01-01
This report summarizes our general knowledge of the geology and petroleum potential, as well as potential problems and hazards associated with development of petroleum resources, within the area proposed for nominations for lease sale number 90. This area includes the U.S. eastern continental margin from Raleigh Bay, just south of Cape Hatteras, to southern Florida, including the upper Continental Slope and inner Blake Plateau. The area for possible sales for lease sale number 90, as well as the area for lease sale number 78 and the previous areas leased are shown in figure 1; physiographic features of the region are shown in figure 2. Six exploration wells have been drilled within the proposed lease area (figs. 3 and 4), but no commercial discoveries have been made. All six wells were drilled on the Continental Shelf. No commercial production has been obtained onshore in the region. The areas already drilled have thin sedimentary rock sections, and the deeper strata are dominantly of continental facies. Petroleum formation may have been hindered by a lack of organic material and lack of sufficient burial for thermal maturation. However, analyses of drilling and seismic profiling data presented here indicate that a much thicker section of sedimentary rocks containing a much higher proportion of marine deposits, exists seaward of the Continental Shelf. These geologic conditions imply that the basins farther offshore may be more favorable environments for generating petroleum.
NASA Astrophysics Data System (ADS)
Bezminabadi, Sina Norouzi; Ramezanzadeh, Ahmad; Esmaeil Jalali, Seyed-Mohammad; Tokhmechi, Behzad; Roustaei, Abbas
2017-03-01
Rate of penetration (ROP) is one of the key indicators of drilling operation performance. The estimation of ROP in drilling engineering is very important in terms of more accurate assessment of drilling time which affects operation costs. Hence, estimation of a ROP model using operational and environmental parameters is crucial. For this purpose, firstly physical and mechanical properties of rock were derived from well logs. Correlation between the pair data were determined to find influential parameters on ROP. A new ROP model has been developed in one of the Azadegan oil field wells in southwest of Iran. The model has been simulated using Multiple Nonlinear Regression (MNR) and Artificial Neural Network (ANN). By adding the rock properties, the estimation of the models were precisely improved. The results of simulation using MNR and ANN methods showed correlation coefficients of 0.62 and 0.87, respectively. It was concluded that the performance of ANN model in ROP prediction is fairly better than MNR method.
[Navigated drilling for femoral head necrosis. Experimental and clinical results].
Beckmann, J; Tingart, M; Perlick, L; Lüring, C; Grifka, J; Anders, S
2007-05-01
In the early stages of osteonecrosis of the femoral head, core decompression by exact drilling into the ischemic areas can reduce pain and achieve reperfusion. Using computer aided surgery, the precision of the drilling can be improved while simultaneously lowering radiation exposure time for both staff and patients. We describe the experimental and clinical results of drilling under the guidance of the fluoroscopically-based VectorVision navigation system (BrainLAB, Munich, Germany). A total of 70 sawbones were prepared mimicking an osteonecrosis of the femoral head. In two experimental models, bone only and obesity, as well as in a clinical setting involving ten patients with osteonecrosis of the femoral head, the precision and the duration of radiation exposure were compared between the VectorVision system and conventional drilling. No target was missed. For both models, there was a statistically significant difference in terms of the precision, the number of drilling corrections as well as the radiation exposure time. The average distance to the desired midpoint of the lesion of both models was 0.48 mm for navigated drilling and 1.06 mm for conventional drilling, the average drilling corrections were 0.175 and 2.1, and the radiation exposure time less than 1 s and 3.6 s, respectively. In the clinical setting, the reduction of radiation exposure (below 1 s for navigation compared to 56 s for the conventional technique) as well as of drilling corrections (0.2 compared to 3.4) was also significant. Computer guided drilling using the fluoroscopically based VectorVision navigation system shows a clearly improved precision with a enormous simultaneous reduction in radiation exposure. It is therefore recommended for clinical routine.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2005-09-30
This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2004 through September 2005. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for amore » next level of deep drilling performance; Phase 2--Develop advanced smart bit-fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. As of report date, TerraTek has concluded all Phase 1 testing and is planning Phase 2 development.« less
Drilling Rig Operation Mode Recognition by an Artificial Neuronet
NASA Astrophysics Data System (ADS)
Abu-Abed, Fares; Borisov, Nikolay
2017-11-01
The article proposes a way to develop a drilling rig operation mode classifier specialized to recognize pre-emergency situations appearable in commercial oil-and-gas well drilling. The classifier is based on the theory of image recognition and artificial neuronet taught on real geological and technological information obtained while drilling. To teach the neuronet, a modified backpropagation algorithm that can teach to reach the global extremum of a target function has been proposed. The target function was a relative recognition error to minimize in the teaching. Two approaches to form the drilling rig pre-emergency situation classifier based on a taught neuronet have been considered. The first one involves forming an output classifier of N different signals, each of which corresponds to a single recognizable situation and, and can be formed on the basis of the analysis of M indications, that is using a uniform indication vocabulary for all recognized situations. The second way implements a universal classifier comprising N specialized ones, each of which can recognize a single pre-emergency situation and having a single output.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mungania, J.
Olkaria Geothermal area is located in the central sector of the Kenya, Rift Valley. A 45MW Geothermal power station has been operational at Olkaria since 1985 supplied by 22 of the 26 wells drilled in the Eastern production field (EPF). Between 1988 and 1993, eight more wells referred to as {open_quote}replacement wells{close_quote} were drilled in the same field to boost steam supply to the station. Petrographic analyses of the drill cuttings is usually done to determine detail stratigraphy of the field, extends of hydrothermal activity, subsurface structures and other parameters which may influence production potential of a well. Analyses ofmore » the drill cuttings from the EPF wells show that: Variations in the whole rock alteration intensities correlate with differences in rocktypes. Permeable horizons, especially the productive feeder zones are well marked by enhanced hydrothermal minerals depositions, mainly quartz, calcite, pyrite and epidote. Other aspects of state of reservoir like boiling are signified by presence of bladed calcite.« less
Elf cites 5 advantages of horizontal drilling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1984-06-01
ELF Aquitaine used horizontal drilling during a pilot test program to bring commercial production from its Rospo Mare oil discovery in the Adriatic, which would have been a costly disappointment if drilled by a conventional vertical well bore. Rospo Mare is a large reservoir containing a top column of highly viscous crude underlain by a water column. The company felt that a well bore that penetrated the reservoir vertically would bring early flooding of the oil column and yield only water. By penetrating the reservoir with a horizontal well drilled high in the oil column, the well successfully produced onmore » numerous tests from Oct. 1982 until the end of the test program in 1983. Production was termed excellent, with productivity during tests reportedly reaching ca 15 times the rate produced from nearby vertical wells. However, ELF said the results usually average ca 5 times the usual rate of vertical wells.« less
Key Technologies and Applications of Gas Drainage in Underground Coal Mine
NASA Astrophysics Data System (ADS)
Zhou, Bo; Xue, Sheng; Cheng, Jiansheng; Li, Wenquan; Xiao, Jiaping
2018-02-01
It is the basis for the long-drilling directional drilling, precise control of the drilling trajectory and ensuring the effective extension of the drilling trajectory in the target layer. The technology can be used to complete the multi-branch hole construction and increase the effective extraction distance of the coal seam. The gas drainage and the bottom grouting reinforcement in the advanced area are realized, and the geological structure of the coal seam can be proved accurately. It is the main technical scheme for the efficient drainage of gas at home and abroad, and it is applied to the field of geological structure exploration and water exploration and other areas. At present, the data transmission method is relatively mature in the technology and application, including the mud pulse and the electromagnetic wave. Compared with the mud pulse transmission mode, the electromagnetic wave transmission mode has obvious potential in the data transmission rate and drilling fluid, and it is suitable for the coal mine. In this paper, the key technologies of the electromagnetic wave transmission mode are analyzed, including the attenuation characteristics of the electromagnetic transmission channel, the digital modulation scheme, the channel coding method and the weak signal processing technology. A coal mine under the electromagnetic wave drilling prototype is developed, and the ground transmission experiments and down hole transmission test are carried out. The main work includes the following aspects. First, the equivalent transmission line method is used to establish the electromagnetic transmission channel model of coal mine drilling while drilling, and the attenuation of the electromagnetic signal is measured when the electromagnetic channel measured. Second, the coal mine EM-MWD digital modulation method is developed. Third, the optimal linear block code which suitable for EM-MWD communication channel in coal mine is proposed. Fourth, the noise characteristics of well near horizontal directional drilling are analyzed, and the multi-stage filter method is proposed to suppress the natural potential and strong frequency interference signal. And the weak electromagnetic communication signal is extracted from the received signal. Finally, the detailed design of the electromagnetic wave while drilling is given.
NASA Astrophysics Data System (ADS)
Bai, Y.; Jia, Z. Y.; Wang, F. J.; Fu, R.; Guo, H. B.; Cheng, D.; Zhang, B. Y.
2017-06-01
Drilling is inevitable for CFRP components’ assembling process in the aviation industry. The exit damage frequently occurs and affects the load carrying capacity of components. Consequently, it is of great urgency to enhance drilling exit quality on CFRP components. The article aims to guide the reasonable choice of drill helical direction and effectively reduce exit damage. Exit observation experiments are carried out with left-hand helical, right-hand helical and straight one-shot drill drilling T800S CFRP laminates separately. The development rules of exit damage and delamination factor curves are obtained. Combined with loading conditions and fracture modes of push-out burrs, and thrust force curves, the influence of drill helical direction on exit damage development is derived. It is found that the main fracture modes for left-hand helical, right-hand helical, and straight one-shot drill are mode I, extrusive fracture, mode III respectively. Among them, mode III has the least effect on exit damage development. Meanwhile, the changing rate of thrust force is relative slow for right-hand helical and straight one-shot drill in the thrust force increasing phase of stage II, which is disadvantaged for exit damage development. Therefore, straight one-shot drill’s exit quality is the best.
Practical measures for reducing the risk of environmental contamination in shale energy production.
Ziemkiewicz, Paul; Quaranta, John D; McCawley, Michael
2014-07-01
Gas recovery from shale formations has been made possible by advances in horizontal drilling and hydraulic fracturing technology. Rapid adoption of these methods has created a surge in natural gas production in the United States and increased public concern about its environmental and human health effects. We surveyed the environmental literature relevant to shale gas development and studied over fifteen well sites and impoundments in West Virginia to evaluate pollution caused by air emissions, light and noise during drilling. Our study also characterized liquid and solid waste streams generated by drilling and hydraulic fracturing and evaluated the integrity of impoundments used to store fluids produced by hydraulic fracturing. While most shale gas wells are completed with little or no environmental contamination, we found that many of the problems associated with shale gas development resulted from inattention to accepted engineering practices such as impoundment construction, improper liner installation and a lack of institutional controls. Recommendations are provided based on the literature and our field studies. They will address not all but a great many of the deficiencies that result in environmental release of contaminants from shale gas development. We also identified areas where new technologies are needed to fully address contaminant releases to air and water.
The Newberry Deep Drilling Project (NDDP)
NASA Astrophysics Data System (ADS)
Bonneville, A.; Cladouhos, T. T.; Petty, S.; Schultz, A.; Sorle, C.; Asanuma, H.; Friðleifsson, G. Ó.; Jaupart, C. P.; Moran, S. C.; de Natale, G.
2017-12-01
We present the arguments to drill a deep well to the ductile/brittle transition zone (T>400°C) at Newberry Volcano, central Oregon state, U.S.A. The main research goals are related to heat and mass transfer in the crust from the point of view of natural hazards and geothermal energy: enhanced geothermal system (EGS supercritical and beyond-brittle), volcanic hazards, mechanisms of magmatic intrusions, geomechanics close to a magmatic system, calibration of geophysical imaging techniques and drilling in a high temperature environment. Drilling at Newberry will bring additional information to a very promising field of research initiated by ICDP in the Deep Drilling project in Iceland with IDDP-1 on Krafla in 2009, followed by IDDP-2 on the Reykjanes ridge in 2016, and the future Japan Beyond-Brittle project and Krafla Magma Testbed. Newberry Volcano contains one of the largest geothermal heat reservoirs in the western United States, extensively studied for the last 40 years. All the knowledge and experience collected make this an excellent choice for drilling a well that will reach high temperatures at relatively shallow depths (< 5000 m). The large conductive thermal anomaly (320°C at 3000 m depth), has already been well-characterized by extensive drilling and geophysical surveys. This will extend current knowledge from the existing 3000 m deep boreholes at the sites into and through the brittle-ductile transition approaching regions of partial melt like lateral dykes. The important scientific questions that will form the basis of a full drilling proposal, have been addressed during an International Continental Drilling Program (ICDP) workshop held in Bend, Oregon in September 2017. They will be presented and discussed as well as the strategic plan to address them.
The Marysville, Montana Geothermal Project
NASA Technical Reports Server (NTRS)
Mcspadden, W. R.; Stewart, D. H.; Kuwada, J. T.
1974-01-01
Drilling the first geothermal well in Montana presented many challenges, not only in securing materials and planning strategies for drilling the wildcat well but also in addressing the environmental, legal, and institutional issues raised by the request for permission to explore a resource which lacked legal definition. The Marysville Geothermal Project was to investigate a dry hot rock heat anomaly. The well was drilled to a total depth of 6790 feet and many fractured water bearing zones were encountered below 1800 feet.
Methods of measurement of exploratory well impacts, offshore Florida
Dustan, Phillip A.; Kindinger, Jack L.; Lidz, B.H.; Hudson, J.H.
1990-01-01
Six offshore oil well tests were drilled off Key West in the late 1950s and early 1960s. Two wells were drilled on coral bottom, two on carbonate sand, and two on mixed turtle grass and gorgonian/sponge hardbottom. After locating the sites with a proton magnetometer; several underwater assessment methods were used to measure the ecological impacts of drilling. Because of differing environments and bottom types, no single method was applicable at every site.
Wear Detection of Drill Bit by Image-based Technique
NASA Astrophysics Data System (ADS)
Sukeri, Maziyah; Zulhilmi Paiz Ismadi, Mohd; Rahim Othman, Abdul; Kamaruddin, Shahrul
2018-03-01
Image processing for computer vision function plays an essential aspect in the manufacturing industries for the tool condition monitoring. This study proposes a dependable direct measurement method to measure the tool wear using image-based analysis. Segmentation and thresholding technique were used as the means to filter and convert the colour image to binary datasets. Then, the edge detection method was applied to characterize the edge of the drill bit. By using cross-correlation method, the edges of original and worn drill bits were correlated to each other. Cross-correlation graphs were able to detect the difference of the worn edge despite small difference between the graphs. Future development will focus on quantifying the worn profile as well as enhancing the sensitivity of the technique.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Regenhardt, C.; Dean, J.; Hancock, J.
The purpose of this study was to determine the feasibility of the multi-drain well method in tight, lenticular formations. Although directional drilling is more costly than conventional vertical drilling, this practice could triple well production. The proposed drilling plan may be more cost efficient than drilling three separate wells with less than 320-acre spacing because it would save the costs of site surveys, rig setup, purchase of the surface lease area, and gas pipeline hookups for two additional well sites. This feasibility study was conducted on the Piceance Basin area, mainly because of the availability of geological information. The resultsmore » of this study will generally apply to other regions with tight, lenticular sand, depending upon the similarity in the total percentage of sand lenses in the area and the lens dimensions and orientations. Appendix A discusses the geology of the eastern Uinta Basin in eastern Utah, and the applicability of this study to the area. Appendix B provides calculation of expected production increase due to angle of drilling. 18 refs., 30 figs., 14 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pietrobono, J.T.
1988-01-01
This paper reports on losing equipment in the hole that is one of the most expensive and potentially dangerous things that can go wrong in drilling a well. Drilling must come to a halt until the equipment is recovered, or the hole must be sidetracked. The well also can become hard to control with essential tools out of reach, increasing the risk of a blowout. Fishing, or recovering lost or stuck equipment in the hole, is therefore a critical procedure at any drilling operation. Fishing can be divided into two broad categories: open hole and cased hole. a major differencemore » between the two is timing: open-hole fishing is done as the well is being drilled, whereas cased-hole fishing is performed during production or well workover. Fishing techniques and types of equipment used also vary between the tow. This lesson describes some of the basic techniques and tools used in open-hole fishing-that is, retrieving fish from a hole that is being drilled but is not yet cased.« less
Exploratory Hydrocarbon Drilling Impacts to Arctic Lake Ecosystems
Thienpont, Joshua R.; Kokelj, Steven V.; Korosi, Jennifer B.; Cheng, Elisa S.; Desjardins, Cyndy; Kimpe, Linda E.; Blais, Jules M.; Pisaric, Michael FJ.; Smol, John P.
2013-01-01
Recent attention regarding the impacts of oil and gas development and exploitation has focused on the unintentional release of hydrocarbons into the environment, whilst the potential negative effects of other possible avenues of environmental contamination are less well documented. In the hydrocarbon-rich and ecologically sensitive Mackenzie Delta region (NT, Canada), saline wastes associated with hydrocarbon exploration have typically been disposed of in drilling sumps (i.e., large pits excavated into the permafrost) that were believed to be a permanent containment solution. However, failure of permafrost as a waste containment medium may cause impacts to lakes in this sensitive environment. Here, we examine the effects of degrading drilling sumps on water quality by combining paleolimnological approaches with the analysis of an extensive present-day water chemistry dataset. This dataset includes lakes believed to have been impacted by saline drilling fluids leaching from drilling sumps, lakes with no visible disturbances, and lakes impacted by significant, naturally occurring permafrost thaw in the form of retrogressive thaw slumps. We show that lakes impacted by compromised drilling sumps have significantly elevated lakewater conductivity levels compared to control sites. Chloride levels are particularly elevated in sump-impacted lakes relative to all other lakes included in the survey. Paleolimnological analyses showed that invertebrate assemblages appear to have responded to the leaching of drilling wastes by a discernible increase in a taxon known to be tolerant of elevated conductivity coincident with the timing of sump construction. This suggests construction and abandonment techniques at, or soon after, sump establishment may result in impacts to downstream aquatic ecosystems. With hydrocarbon development in the north predicted to expand in the coming decades, the use of sumps must be examined in light of the threat of accelerated permafrost thaw, and the potential for these industrial wastes to impact sensitive Arctic ecosystems. PMID:24223170
Exploratory hydrocarbon drilling impacts to Arctic lake ecosystems.
Thienpont, Joshua R; Kokelj, Steven V; Korosi, Jennifer B; Cheng, Elisa S; Desjardins, Cyndy; Kimpe, Linda E; Blais, Jules M; Pisaric, Michael F J; Smol, John P
2013-01-01
Recent attention regarding the impacts of oil and gas development and exploitation has focused on the unintentional release of hydrocarbons into the environment, whilst the potential negative effects of other possible avenues of environmental contamination are less well documented. In the hydrocarbon-rich and ecologically sensitive Mackenzie Delta region (NT, Canada), saline wastes associated with hydrocarbon exploration have typically been disposed of in drilling sumps (i.e., large pits excavated into the permafrost) that were believed to be a permanent containment solution. However, failure of permafrost as a waste containment medium may cause impacts to lakes in this sensitive environment. Here, we examine the effects of degrading drilling sumps on water quality by combining paleolimnological approaches with the analysis of an extensive present-day water chemistry dataset. This dataset includes lakes believed to have been impacted by saline drilling fluids leaching from drilling sumps, lakes with no visible disturbances, and lakes impacted by significant, naturally occurring permafrost thaw in the form of retrogressive thaw slumps. We show that lakes impacted by compromised drilling sumps have significantly elevated lakewater conductivity levels compared to control sites. Chloride levels are particularly elevated in sump-impacted lakes relative to all other lakes included in the survey. Paleolimnological analyses showed that invertebrate assemblages appear to have responded to the leaching of drilling wastes by a discernible increase in a taxon known to be tolerant of elevated conductivity coincident with the timing of sump construction. This suggests construction and abandonment techniques at, or soon after, sump establishment may result in impacts to downstream aquatic ecosystems. With hydrocarbon development in the north predicted to expand in the coming decades, the use of sumps must be examined in light of the threat of accelerated permafrost thaw, and the potential for these industrial wastes to impact sensitive Arctic ecosystems.
Trends in U.S. Oil and Natural Gas Upstream Costs
2016-01-01
Average 2015 well drilling and completion costs in five onshore areas decline 25% and 30% below their level in 2012 The U.S. Energy Information Administration (EIA) commissioned IHS Global Inc. (IHS) to perform a study of upstream drilling and production costs. The IHS report assesses capital and operating costs associated with drilling, completing, and operating wells and facilities.
30 CFR 250.415 - What must my casing and cementing programs include?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.415 What must my casing and cementing... in Deep Water Wells (as incorporated by reference in § 250.198), if you drill a well in water depths...
30 CFR 250.415 - What must my casing and cementing programs include?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.415 What must my casing and cementing... in Deep Water Wells (as incorporated by reference in § 250.198), if you drill a well in water depths...
30 CFR 250.411 - What information must I submit with my application?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.411 What information must I submit with my application? In addition to... proposed well § 250.412 (b) Design criteria used for the proposed well § 250.413 (c) Drilling prognosis...
30 CFR 250.415 - What must my casing and cementing programs include?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.415 What must my casing and cementing... in Deep Water Wells (as incorporated by reference in § 250.198), if you drill a well in water depths...
Technology Development and Field Trials of EGS Drilling Systems at Chocolate Mountain
Steven Knudsen
2012-01-01
Polycrystalline diamond compact (PDC) bits are routinely used in the oil and gas industry for drilling medium to hard rock but have not been adopted for geothermal drilling, largely due to past reliability issues and higher purchase costs. The Sandia Geothermal Research Department has recently completed a field demonstration of the applicability of advanced synthetic diamond drill bits for production geothermal drilling. Two commercially-available PDC bits were tested in a geothermal drilling program in the Chocolate Mountains in Southern California. These bits drilled the granitic formations with significantly better Rate of Penetration (ROP) and bit life than the roller cone bit they are compared with. Drilling records and bit performance data along with associated drilling cost savings are presented herein. The drilling trials have demonstrated PDC bit drilling technology has matured for applicability and improvements to geothermal drilling. This will be especially beneficial for development of Enhanced Geothermal Systems whereby resources can be accessed anywhere within the continental US by drilling to deep, hot resources in hard, basement rock formations.
The Case for Scientific Drilling of Precambrian Sedimentary Sequences: A Mission to Early Earth
NASA Astrophysics Data System (ADS)
Buick, R.; Anbar, A. D.; Mojzsis, S. J.; Kaufman, A. J.; Kieft, T. L.; Lyons, T. W.; Humayun, M.
2001-12-01
Research into the emergence and early evolution of life, particularly in relation to environmental conditions, has intensified in the past decade. The field is energized by controversy (e.g., over the history of atmospheric composition, ocean redox, climate and biochemical pathways) and by the application of new biogeochemical tools (e.g., ion probe in situ stable isotope studies; improved geochronological techniques; non-mass-dependent stable isotope effects; stable metal isotope systematics; advances in organic geochemistry/biomarkers). The past decade has also seen improved understanding of old tools (notably, S isotopes), and new perspectives on evolution and on microbial interaction with the environment borne of the genomics revolution. Recent papers demonstrate the potential for innovative research when such developments are integrated, as well as the limitations of present knowledge. The chief limiting factor is not lack of scientists or advanced techniques, but availability of fresh samples from suitable successions. Where classic Precambrian stratigraphy exists, suitable rocks are rarely exposed due to interaction with the oxidizing atmosphere, occurrence of flat-lying strata or sedimentary cover. Available drill-cores are concentrated around ore bodies, and hence are inherently altered or not environmentally representative. Stratigraphic drilling using clean diamond drilling techniques, targeted in accord with scientific priorities, could provide samples of unmatched quality across the most interesting stratigraphic intervals. Diamond drilling is a proven, inexpensive technology for accessing subsurface material. The time is ripe to use this technology to secure the materials needed for further advances. The Mission to Early Earth (MtEE) Focus Group of the NASA Astrobiology Institute is developing a case for the acquisition, curation and distribution of suitable samples, with a special focus on diamond drilling. A communal activity is envisioned, modeled after the Ocean Drilling Program but focussing on the Precambrian record. This poster will present information on MtEE, and plans for a pilot project developed as part of the Summer '01 MtEE excursion to W. Australia.
NASA Astrophysics Data System (ADS)
Santoro, R.; Ingraffea, A. R.
2015-12-01
Previous modeling (ingraffea et al. PNAS, 2014) indicated roughly two-times higher cumulative risk for wellbore impairment in unconventional wells, relative to conventional wells, and large spatial variation in risk for oil and gas wells drilled in the state of Pennsylvania. Impairment risk for wells in the northeast portion of the state were found to be 8.5-times greater than that of wells drilled in the rest of the state. Here, we set out to explain this apparent regional variability through Boosted Regression Tree (BRT) analysis of geographic, developmental, and general well attributes. We find that regional variability is largely driven by the nature of the development, i.e. whether conventional or unconventional development is dominant. Oil and natural gas market prices and total well depths present as major influences in wellbore impairment, with moderate influences from well densities and geologic factors. The figure depicts influence paths for predictors of impairments for the state (top left), SW region (top right), unconventional/NE region (bottom left) and conventional/NW region (bottom right) models. Influences are scaled to reflect percent contributions in explaining variability in the model.
An innovative fast-track development for Cote d`Ivoire
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kreider, G.J.; Barnes, J.E.; Smitherman, J.E.
1996-12-31
In May, 1994, approval was received for the development of the Panthere Gas Field and Lion Oil Field by UMC Petroleum Corporation as operator. At that time, UMC had drilled one well from a jackup at Panthere in 270 feet of water and had set a guyed caisson. Following the Panthere gas discovery, the Lion oil discovery well was drilled in 235 feet of water and another guyed caisson was set. Paragon Engineering Services had been hired in late 1993 to develop project scenarios and cost estimates and as the project evolved, detailed engineering, procurement and construction management services. Productionmore » equipment for 30,000 BOPD, 16,000 BWPD and 75 MMSCFD was to be installed on a jackup drilling rig converted to a Mobile Offshore Production Unit (MOPU) located at the Lion A caisson. Production from Panthere would flow through an 8-inch line to the MOPU. The production equipment on the MOPU would (1) separate oil, water and gas, (2) treat the oil for sale and the water for discharge, (3) pump the oil into an 8-inch pipeline to the refinery in Abidjan, (4) compress the oil well and gas well gas as needed, and (5) dehydrate it for sale. A CALM buoy with shuttle tanker was included in the original plan for early production and as a backup to the oil pipeline. It was also unknown at project initiation whether a gas sales contract would be successfully negotiated, and thus the project was to proceed on the basis of flaring produced gas with capability to add equipment at a later date for gas sales. This paper describes how the project was organized and how this organization allowed the project to accommodate changes and construction problems as they developed while completing the project on time.« less
Conducting a 3D Converted Shear Wave Project to Reduce Exploration Risk at Wister, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matlick, Skip; Walsh, Patrick; Rhodes, Greg
2015-06-30
Ormat sited 2 full-size exploration wells based on 3D seismic interpretation of fractures, prior drilling results, and temperature anomaly. The wells indicated commercial temperatures (>300 F), but almost no permeability, despite one of the wells being drilled within 820 ft of an older exploration well with reported indications of permeability. Following completion of the second well in 2012, Ormat undertook a lengthy program to 1) evaluate the lack of observed permeability, 2) estimate the likelihood of finding permeability with additional drilling, and 3) estimate resource size based on an anticipated extent of permeability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-05-31
Research was expanded to the drilling of crystalline rock. Advance rates of 40 inches per minute have been achieved at 16,000 psi, 10 gpm flow rate in a 30,000 psi compressive strength rock using the water alone as the drilling mechanism. The quality of the hole achieved as the jet drilled a variety of rock was found to vary and a hydromechanical drilling bit, combining high pressure water jets with roller cones, has been developed. A field drilling unit has been tested and modified to allow the drilling of holes to 3/sup 1///sub 2/ inch diameter using the hydromechanical drill.more » Preliminary work on the development of a cavitation test for rock is also included.« less
43 CFR 3217.14 - When will BLM approve my drilling or development contract?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false When will BLM approve my drilling or... RESOURCE LEASING Cooperative Agreements § 3217.14 When will BLM approve my drilling or development contract? BLM may approve a drilling or development contract when: (a) One or more geothermal lessees enter into...
43 CFR 3217.14 - When will BLM approve my drilling or development contract?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false When will BLM approve my drilling or... RESOURCE LEASING Cooperative Agreements § 3217.14 When will BLM approve my drilling or development contract? BLM may approve a drilling or development contract when: (a) One or more geothermal lessees enter into...
Lapland longspur mortality at an oil well drilling rig site, Laramie County, Wyoming
Ramirez, Pedro; Dickerson, Kimberly K.; Lindstrom, Jim; Meteyer, Carol U.; Darrah, Scott
2015-01-01
Two hundred fifty-one Lapland longspur (Calcarius lapponicus) carcasses were recovered around an oil well drilling rig in Laramie County, Wyoming, USA, on December 13–14, 2010, apparent victims of a winter storm and “light entrapment” from the lights on the drilling rig during foggy conditions. We found Lapland longspur carcasses distributed around the drilling rig from 33 m to 171 m. Investigators did not find evidence of bird carcasses on the drilling rig deck or equipment immediately adjacent to the drilling rig. We ruled out chemical toxins and disease as a cause of mortality. Weather conditions, the circular depositional pattern of carcasses around the drilling rig, and bird necropsy results led investigators to conclude that the Lapland longspur mortality was the result of the migrating birds entering the area illuminated by the drilling rig lights in freezing fog and the birds repeatedly circling the drilling rig until they fell to the ground in exhaustion and dying from subsequent trauma. Further research is needed to understand how to most effectively adjust lighting of onshore drilling rigs to reduce the potential for avian light entrapment. Published 2014. This article is a U.S. Government work and is in the public domain in the USA.
Soil properties affecting wheat yields following drilling-fluid application.
Bauder, T A; Barbarick, K A; Ippolito, J A; Shanahan, J F; Ayers, P D
2005-01-01
Oil and gas drilling operations use drilling fluids (mud) to lubricate the drill bit and stem, transport formation cuttings to the surface, and seal off porous geologic formations. Following completion of the well, waste drilling fluid is often applied to cropland. We studied potential changes in soil compaction as indicated by cone penetration resistance, pH, electrical conductivity (EC(e)), sodium adsorption ratio (SAR), extractable soil and total straw and grain trace metal and nutrient concentrations, and winter wheat (Triticum aestivum L. 'TAM 107') grain yield following water-based, bentonitic drilling-fluid application (0-94 Mg ha(-1)) to field test plots. Three methods of application (normal, splash-plate, and spreader-bar) were used to study compaction effects. We measured increasing SAR, EC(e), and pH with drilling-fluid rates, but not to levels detrimental to crop production. Field measurements revealed significantly higher compaction within areas affected by truck travel, but also not enough to affect crop yield. In three of four site years, neither drilling-fluid rate nor application method affected grain yield. Extractions representing plant availability and plant analyses results indicated that drilling fluid did not significantly increase most trace elements or nutrient concentrations. These results support land application of water-based bentonitic drilling fluids as an acceptable practice on well-drained soils using controlled rates.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2003-10-01
This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2002 through September 2002. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for amore » next level of deep drilling performance; Phase 2--Develop advanced smart bit--fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. Accomplishments to date include the following: 4Q 2002--Project started; Industry Team was assembled; Kick-off meeting was held at DOE Morgantown; 1Q 2003--Engineering meeting was held at Hughes Christensen, The Woodlands Texas to prepare preliminary plans for development and testing and review equipment needs; Operators started sending information regarding their needs for deep drilling challenges and priorities for large-scale testing experimental matrix; Aramco joined the Industry Team as DEA 148 objectives paralleled the DOE project; 2Q 2003--Engineering and planning for high pressure drilling at TerraTek commenced; 3Q 2003--Continuation of engineering and design work for high pressure drilling at TerraTek; Baker Hughes INTEQ drilling Fluids and Hughes Christensen commence planning for Phase 1 testing--recommendations for bits and fluids.« less
30 CFR 816.13 - Casing and sealing of drilled holes: General requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Casing and sealing of drilled holes: General...-SURFACE MINING ACTIVITIES § 816.13 Casing and sealing of drilled holes: General requirements. Each exploration hole, other drill or borehole, well, or other exposed underground opening shall be cased, sealed...
77 FR 37600 - Safety Zone; Arctic Drilling and Support Vessels, Puget Sound, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... made local inquiries and chartered a vessel to observe the mobile offshore drilling unit (MODU) KULLUK... 1625-AA00 Safety Zone; Arctic Drilling and Support Vessels, Puget Sound, WA AGENCY: Coast Guard, DHS... nineteen vessels associated with Arctic drilling as well as their lead towing vessels while those vessels...
30 CFR 816.13 - Casing and sealing of drilled holes: General requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Casing and sealing of drilled holes: General...-SURFACE MINING ACTIVITIES § 816.13 Casing and sealing of drilled holes: General requirements. Each exploration hole, other drill or borehole, well, or other exposed underground opening shall be cased, sealed...
30 CFR 816.13 - Casing and sealing of drilled holes: General requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Casing and sealing of drilled holes: General...-SURFACE MINING ACTIVITIES § 816.13 Casing and sealing of drilled holes: General requirements. Each exploration hole, other drill or borehole, well, or other exposed underground opening shall be cased, sealed...
30 CFR 816.13 - Casing and sealing of drilled holes: General requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Casing and sealing of drilled holes: General...-SURFACE MINING ACTIVITIES § 816.13 Casing and sealing of drilled holes: General requirements. Each exploration hole, other drill or borehole, well, or other exposed underground opening shall be cased, sealed...
30 CFR 816.13 - Casing and sealing of drilled holes: General requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Casing and sealing of drilled holes: General...-SURFACE MINING ACTIVITIES § 816.13 Casing and sealing of drilled holes: General requirements. Each exploration hole, other drill or borehole, well, or other exposed underground opening shall be cased, sealed...
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Casing and sealing of drilled holes: Temporary...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the...
30 CFR 816.15 - Casing and sealing of drilled holes: Permanent.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Casing and sealing of drilled holes: Permanent...-SURFACE MINING ACTIVITIES § 816.15 Casing and sealing of drilled holes: Permanent. When no longer needed... exploration hole, other drilled hole or borehole, well, and other exposed underground opening shall be capped...
30 CFR 816.15 - Casing and sealing of drilled holes: Permanent.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Casing and sealing of drilled holes: Permanent...-SURFACE MINING ACTIVITIES § 816.15 Casing and sealing of drilled holes: Permanent. When no longer needed... exploration hole, other drilled hole or borehole, well, and other exposed underground opening shall be capped...
30 CFR 816.15 - Casing and sealing of drilled holes: Permanent.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Casing and sealing of drilled holes: Permanent...-SURFACE MINING ACTIVITIES § 816.15 Casing and sealing of drilled holes: Permanent. When no longer needed... exploration hole, other drilled hole or borehole, well, and other exposed underground opening shall be capped...
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Casing and sealing of drilled holes: Temporary...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the...
30 CFR 816.15 - Casing and sealing of drilled holes: Permanent.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Casing and sealing of drilled holes: Permanent...-SURFACE MINING ACTIVITIES § 816.15 Casing and sealing of drilled holes: Permanent. When no longer needed... exploration hole, other drilled hole or borehole, well, and other exposed underground opening shall be capped...
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Casing and sealing of drilled holes: Temporary...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the...
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Casing and sealing of drilled holes: Temporary...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the...
30 CFR 250.616 - Blowout preventer system testing, records, and drills.
Code of Federal Regulations, 2011 CFR
2011-07-01
... drills. 250.616 Section 250.616 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND... drills. (a) BOP pressure tests. When you pressure test the BOP system you must conduct a low-pressure... engaged in well-workover operations shall participate in a weekly BOP drill to familiarize crew members...
Surface control bent sub for directional drilling of petroleum wells
Russell, Larry R.
1986-01-01
Directional drilling apparatus for incorporation in a drill string, wherein a lower apparatus section is angularly deviated from vertical by cam action and wherein rotational displacement of the angularly deviated apparatus section is overcome by additional cam action, the apparatus being operated by successive increases and decreases of internal drill string pressure.
Chemical and biological assessment of two offshore drilling sites in the Alaskan Arctic.
Trefry, John H; Dunton, Kenneth H; Trocine, Robert P; Schonberg, Susan V; McTigue, Nathan D; Hersh, Eric S; McDonald, Thomas J
2013-05-01
A retrospective chemical and biological study was carried out in Camden Bay, Alaskan Beaufort Sea, where single exploratory oil wells were drilled at two sites more than two decades ago. Barium from discharged drilling mud was present in sediments at concentrations as high as 14%, ~200 times above background, with significantly higher concentrations of Ba, but not other metals, within 250 m of the drilling site versus reference stations. Elevated concentrations of Cr, Cu, Hg and Pb were found only at two stations within 25 m of one drilling site. Concentrations of total polycyclic aromatic hydrocarbons (TPAH) were not significantly different at reference versus drilling-site stations; however, TPAH were elevated in Ba-rich layers from naturally occurring perylene in ancient formation cuttings. Infaunal biomass and species abundance were not significantly different at reference versus drilling-site stations; infauna were less diverse at drilling-site stations. Our assessment showed that discharges from single wells within large areas caused minimal long-term, adverse impacts to the benthic ecosystem. Copyright © 2013 Elsevier Ltd. All rights reserved.
Characterization of drilling waste from shale gas exploration in Central and Eastern Poland.
Mikos-Szymańska, Marzena; Rusek, Piotr; Borowik, Krzysztof; Rolewicz, Maciej; Bogusz, Paulina; Gluzińska, Joanna
2018-05-28
The purpose of this research was to determine and evaluate the chemical properties of drilling waste from five well sites in Central and Eastern Poland. It was found that spent drilling fluids can contain high values of nickel and mercury (270 and 8.77 mg kg -1 , respectively) and can exceed the maximum permissible limits recommended by the EC regulations for safety of soils (75 mg kg -1 for nickel and 1.5 mg kg -1 for mercury). The heavy metal concentrations in the studied drill cuttings did not exceed the maximum permissible limits recommended by the EC regulation. Drilling wastes contain macroelements (e.g., calcium, magnesium, and potassium) as well as trace elements (e.g., copper, iron, zinc, and manganese) that are essential for the plant growth. It was stated that water extracts of drilling fluids and drill cuttings, according to anions presence, had not any specific constituents of concern based on FAO irrigation guidelines, the USEPA WQC, and toxicity values. X-ray diffraction analysis was used to understand the structure and texture of waste drilling fluid solids and drill cuttings. Analysis of the mineralogical character of drilling fluid solids revealed that they contained calcite, quartz, muscovite, sylvite, barite, dolomite, and orthoclase. Drill cuttings contained calcite quartz, muscovite, barite, dolomite, and barium chloride.
Mineral and Lithology Mapping of Drill Core Pulps Using Visible and Infrared Spectrometry
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, G. R., E-mail: G.Taylor@unsw.edu.au
2000-12-15
A novel approach for using field spectrometry for determining both the mineralogy and the lithology of drill core pulps (powders) is developed and evaluated. The methodology is developed using material from a single drillhole through a mineralized sequence of rocks from central New South Wales. Mineral library spectra are used in linear unmixing routines to determine the mineral abundances in drill core pulps that represent between 1 m and 3 m of core. Comparison with X-Ray Diffraction (XRD) analyses shows that for most major constituents, spectrometry provides an estimate of quantitative mineralogy that is as reliable as that provided bymore » XRD. Confusion between the absorption features of calcite and those of chlorite causes the calcite contents determined by spectrometry to be unreliable. Convex geometry is used to recognize the spectra of those samples that are extreme and are representative of unique lithologies. Linear unmixing is used to determine the abundance of these lithologies in each drillhole sample and these abundances are used to interpret the geology of the drillhole. The interpreted geology agrees well with conventional drillhole logs of the visible geology and photographs of the split core. The methods developed provide a quick and cost-effective way of determining the lithology and alteration mineralogy of drill core pulps.« less
NASA Astrophysics Data System (ADS)
Kukowski, Nina; Totsche, Kai Uwe; Abratis, Michael; Habisreuther, Annett; Ward, Timothy; Influins Drilling-Team
2014-05-01
To shed light on the coupled dynamics of near surface and deep fluids in a sedimentary basin on various scales, ranging from the pore scale to the extent of an entire basin, is of paramount importance to understand the functioning of sedimentary basins fluid systems and therefore e.g. drinking water supply. It is also the fundamental goal of INFLUINS (INtegrated FLuid dynamics IN Sedimentary basins), a research initiative of several groups from Friedrich-Schiller University of Jena and their partners. This research association is focusing on the nearby Thuringian basin, a well confined, small intra-continental sedimentary basin in Germany, as a natural geo laboratory. In a multidisciplinary approach, embracing different fields of geophysics like seismic reflection profiling or airborne geomagnetics, structural geology, sedimentology, hydrogeology, hydrochemistry and hydrology, remote sensing, microbiology and mineralogy, among others, and including both, field-based, laboratory-based and computer-based research, an integral INFLUINS topic is the potential interaction of aquifers within the basin and at its rims. The Thuringian basin, which is composed of sedimentary rocks from the latest Paleozoic and mainly Triassic, is particularly suited to undertake such research as it is of relative small size, about 50 to 100 km, easily accessible, and quite well known from previous studies, and therefore also a perfect candidate for deep drilling. After the acquisition of 76 km seismic reflection data in spring 2011, to get as much relevant data as possible from a deep drilling at the cross point between two seismic profiles with a limited financial budget, an optimated core sampling and measuring strategy including partial coring, borehole geophysics and pump tests as well as a drill hole design, which enables for later continuation of drilling down to the basement, had been developed. Drilling Triassic rocks from Keuper to lower Buntsandstein was successfully realised down to a final depth of 1179 m from late June to mid-September 2013. Here, we give an introduction into the layout of INFLUINS deep drilling together with a summary of preliminary results, e.g. on the nature of the boundaries between Muschelkalk and Buntsandstein, and between upper and middle Buntsandstein, a complete core recovery of upper Buntsandstein saliniferous formations as well as unexpectedly low porosity and permeability of potential aquifers.
Coiled tubing drilling with supercritical carbon dioxide
Kolle , Jack J.
2002-01-01
A method for increasing the efficiency of drilling operations by using a drilling fluid material that exists as supercritical fluid or a dense gas at temperature and pressure conditions existing at a drill site. The material can be used to reduce mechanical drilling forces, to remove cuttings, or to jet erode a substrate. In one embodiment, carbon dioxide (CO.sub.2) is used as the material for drilling within wells in the earth, where the normal temperature and pressure conditions cause CO.sub.2 to exist as a supercritical fluid. Supercritical carbon dioxide (SC--CO.sub.2) is preferably used with coiled tube (CT) drilling equipment. The very low viscosity SC--CO.sub.2 provides efficient cooling of the drill head, and efficient cuttings removal. Further, the diffusivity of SC--CO.sub.2 within the pores of petroleum formations is significantly higher than that of water, making jet erosion using SC--CO.sub.2 much more effective than water jet erosion. SC--CO.sub.2 jets can be used to assist mechanical drilling, for erosion drilling, or for scale removal. A choke manifold at the well head or mud cap drilling equipment can be used to control the pressure within the borehole, to ensure that the temperature and pressure conditions necessary for CO.sub.2 to exist as either a supercritical fluid or a dense gas occur at the drill site. Spent CO.sub.2 can be vented to the atmosphere, collected for reuse, or directed into the formation to aid in the recovery of petroleum.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oldham, D.W.
Commercial quantities of gas have been produced from shallow sandstone reservoirs of the Fort Union Formation (Paleocene) in the Powder River Basin of Wyoming. The two largest accumulations discovered to date, Oedekoven and Chan pools, were drilled on prospects which invoked differential compaction as a mechanism for gas entrapment and prospect delineation. Gas is believed to have accumulated in localized structural highs early in the burial history of lenticular sands. Structural relief is due to the compaction contrast between sand and stratigraphically-equivalent fine-grained sediments. A shallow Fort Union gas play was based on reports of shallow gas shows, the occurrencemore » of thick coals which could have served as sources for bacterial gas, and the presence of lenticular sandstones which may have promoted the development of compaction structures early in the burial process, to which bacterial gas migrated. Five geologic elements related to compactional trap development were used to rank prospects. Drilling of the Oedekoven prospect, which possessed all prospect elements, led to the discovery of the Oedekoven Fort Union gas pool at a depth of 340 ft (104 m). The uncemented, very fine grained, well-sorted {open_quotes}Canyon sand{close_quotes} pay has extremely high intergranular porosity. Low drilling and completion costs associated with shallow, high-permeability reservoirs, an abundance of subsurface control with which to delineate prospects, and existing gas-gathering systems make Fort Union sandstones attractive primary targets in shallow exploration efforts as well as secondary objectives in deeper drilling programs.« less
Sample Acqusition Drilling System for the the Resource Prospector Mission
NASA Astrophysics Data System (ADS)
Zacny, K.; Paulsen, G.; Quinn, J.; Smith, J.; Kleinhenz, J.
2015-12-01
The goal of the Lunar Resource Prospector Mission (RPM) is to capture and identify volatiles species within the top meter of the lunar regolith. The RPM drill has been designed to 1. Generate cuttings and place them on the surface for analysis by the the Near InfraRed Volatiles Spectrometer Subsystem (NIRVSS), and 2. Capture cuttings and transfer them to the Oxygen and Volatile Extraction Node (OVEN) coupled with the Lunar Advanced Volatiles Analysis (LAVA) subsystem. The RPM drill is based on the Mars Icebreaker drill developed for capturing samples of ice and ice cemented ground on Mars. The drill weighs approximately 10 kg and is rated at ~300 Watt. It is a rotary-percussive, fully autonomous system designed to capture cuttings for analysis. The drill consists of: 1. Rotary-Percussive Drill Head, 2. Sampling Auger, 3. Brushing station, 4. Z-stage, 5. Deployment stage. To reduce sample handling complexity, the drill auger is designed to capture cuttings as opposed to cores. High sampling efficiency is possible through a dual design of the auger. The lower section has deep and low pitch flutes for retaining of cuttings. The upper section has been designed to efficiently move the cuttings out of the hole. The drill uses a "bite" sampling approach where samples are captured in ~10 cm intervals. The first generation drill was tested in Mars chamber as well as in Antarctica and the Arctic. It demonstrated drilling at 1-1-100-100 level (1 meter in 1 hour with 100 Watt and 100 N Weight on Bit) in ice, ice cemented ground, soil, and rocks. The second generation drill was deployed on a Carnegie Mellon University rover, called Zoe, and tested in Atacama in 2012. The tests demonstrated fully autonomous sample acquisition and delivery to a carousel. The third generation drill was tested in NASA GRC's vacuum chamber, VF13, at 10-5 torr and approximately 200 K. It demonstrated successful capture and transfer of icy samples to a crucible. The drill has been modified and integrated onto the NASA JSC RPM rover. It has been undergoing testing in a lab and in the field during the Summer of 2015.
NASA Astrophysics Data System (ADS)
Mannon, Timothy Patrick, Jr.
Improving well design has and always will be the primary goal in drilling operations in the oil and gas industry. Oil and gas plays are continuing to move into increasingly hostile drilling environments, including near and/or sub-salt proximities. The ability to reduce the risk and uncertainly involved in drilling operations in unconventional geologic settings starts with improving the techniques for mudweight window modeling. To address this issue, an analysis of wellbore stability and well design improvement has been conducted. This study will show a systematic approach to well design by focusing on best practices for mudweight window projection for a field in Mississippi Canyon, Gulf of Mexico. The field includes depleted reservoirs and is in close proximity of salt intrusions. Analysis of offset wells has been conducted in the interest of developing an accurate picture of the subsurface environment by making connections between depth, non-productive time (NPT) events, and mudweights used. Commonly practiced petrophysical methods of pore pressure, fracture pressure, and shear failure gradient prediction have been applied to key offset wells in order to enhance the well design for two proposed wells. For the first time in the literature, the accuracy of the commonly accepted, seismic interval velocity based and the relatively new, seismic frequency based methodologies for pore pressure prediction are qualitatively and quantitatively compared for accuracy. Accuracy standards will be based on the agreement of the seismic outputs to pressure data obtained while drilling and petrophysically based pore pressure outputs for each well. The results will show significantly higher accuracy for the seismic frequency based approach in wells that were in near/sub-salt environments and higher overall accuracy for all of the wells in the study as a whole.
Risk assessment of oil and gas well drilling activities in Iran - a case study: human factors.
Amir-Heidari, Payam; Farahani, Hadi; Ebrahemzadih, Mehrzad
2015-01-01
Oil and gas well drilling activities are associated with numerous hazards which have the potential to cause injury or harm for people, property and the environment. These hazards are also a threat for the reputation of drilling companies. To prevent accidents and undesired events in drilling operations it is essential to identify, evaluate, assess and control the attendant risks. In this work, a structured methodology is proposed for risk assessment of drilling activities. A case study is performed to identify, analyze and assess the risks arising from human factors in one of the on shore drilling sites in southern Iran. A total of 17 major hazards were identified and analyzed using the proposed methodology. The results showed that the residual risks of 100% of these hazards were in the acceptable or transitional zone, and their levels were expected to be lowered further by proper controls. This structured methodology may also be used in other drilling sites and companies for assessing the risks.
Environmental corrections of a dual-induction logging while drilling tool in vertical wells
NASA Astrophysics Data System (ADS)
Kang, Zhengming; Ke, Shizhen; Jiang, Ming; Yin, Chengfang; Li, Anzong; Li, Junjian
2018-04-01
With the development of Logging While Drilling (LWD) technology, dual-induction LWD logging is not only widely applied in deviated wells and horizontal wells, but it is used commonly in vertical wells. Accordingly, it is necessary to simulate the response of LWD tools in vertical wells for logging interpretation. In this paper, the investigation characteristics, the effects of the tool structure, skin effect and drilling environment of a dual-induction LWD tool are simulated by the three-dimensional (3D) finite element method (FEM). In order to closely simulate the actual situation, real structure of the tool is taking into account. The results demonstrate that the influence of the background value of the tool structure can be eliminated. The values of deducting the background of a tool structure and analytical solution have a quantitative agreement in homogeneous formations. The effect of measurement frequency could be effectively eliminated by chart of skin effect correction. In addition, the measurement environment, borehole size, mud resistivity, shoulder bed, layer thickness and invasion, have an effect on the true resistivity. To eliminate these effects, borehole correction charts, shoulder bed correction charts and tornado charts are computed based on real tool structure. Based on correction charts, well logging data can be corrected automatically by a suitable interpolation method, which is convenient and fast. Verified with actual logging data in vertical wells, this method could obtain the true resistivity of formation.
Integrated Approach to Drilling Project in Unconventional Reservoir Using Reservoir Simulation
NASA Astrophysics Data System (ADS)
Stopa, Jerzy; Wiśniowski, Rafał; Wojnarowski, Paweł; Janiga, Damian; Skrzypaszek, Krzysztof
2018-03-01
Accumulation and flow mechanisms in unconventional reservoir are different compared to conventional. This requires a special approach of field management with drilling and stimulation treatments as major factor for further production. Integrated approach of unconventional reservoir production optimization assumes coupling drilling project with full scale reservoir simulation for determine best well placement, well length, fracturing treatment design and mid-length distance between wells. Full scale reservoir simulation model emulate a part of polish shale - gas field. The aim of this paper is to establish influence of technical factor for gas production from shale gas field. Due to low reservoir permeability, stimulation treatment should be direct towards maximizing the hydraulic contact. On the basis of production scenarios, 15 stages hydraulic fracturing allows boost gas production over 1.5 times compared to 8 stages. Due to the possible interference of the wells, it is necessary to determine the distance between the horizontal parts of the wells trajectories. In order to determine the distance between the wells allowing to maximize recovery factor of resources in the stimulated zone, a numerical algorithm based on a dynamic model was developed and implemented. Numerical testing and comparative study show that the most favourable arrangement assumes a minimum allowable distance between the wells. This is related to the volume ratio of the drainage zone to the total volume of the stimulated zone.
Force of resistance to pipeline pulling in plane and volumetrically curved wells
NASA Astrophysics Data System (ADS)
Toropov, V. S.; Toropov, S. Yu; Toropov, E. S.
2018-05-01
A method has been developed for calculating the component of the pulling force of a pipeline, arising from the well curvature in one or several planes, with the assumption that the pipeline is ballasted by filling with water or otherwise until zero buoyancy in the drilling mud is reached. This paper shows that when calculating this force, one can neglect the effect of sections with zero curvature. In the other case, if buoyancy of the pipeline is other than zero, the resistance force in the curvilinear sections should be calculated taking into account the difference between the normal components of the buoyancy force and weight. In the paper, it is proved that without taking into account resistance forces from the viscosity of the drilling mud, if buoyancy of the pipeline is zero, the total resistance force is independent of the length of the pipe and is determined by the angle equal to the sum of the entry angle and the exit angle of the pipeline to the day surface. For the case of the well curvature in several planes, it is proposed to perform the calculation of such volumetrically curved well by the central angle of the well profile. Analytical dependences are obtained that allow calculating the pulling force for well profiles with a variable curvature radius, i.e. at different angles of deviation between the drill pipes along the well profile.
Commercial geophysical well logs from the USW G-1 drill hole, Nevada Test Site, Nevada
Muller, D.C.; Kibler, J.E.
1983-01-01
Drill hole USW G-1 was drilled at Yucca Mountain, Nevada Test Site, Nevada, as part of the ongoing exploration program for the Nevada Nuclear Waste Storage Investigations. Contract geophysical well logs run at USW G-1 show only limited stratigraphic correlations, but correlate reasonably well with the welding of the ash-flow and ash-fall tuffs. Rocks in the upper part of the section have highly variable physical properties, but are more uniform and predictably lower in the section.
Forecasting petroleum discoveries in sparsely drilled areas: Nigeria and the North Sea
DOE Office of Scientific and Technical Information (OSTI.GOV)
Attanasi, E.D.; Root, D.H.
1988-10-01
Decline function methods for projecting future discoveries generally capture the crowding effects of wildcat wells on the discovery rate. However, these methods do not accommodate easily situations where exploration areas and horizons are expanding. In this paper, a method is presented that uses a mapping algorithm for separating these often countervailing influences. The method is applied to Nigeria and the North Sea. For an amount of future drilling equivalent to past drilling (825 wildcat wells), future discoveries (in resources found) for Nigeria are expected to decline by 68% per well but still amount to 8.5 billion barrels of oil equivalentmore » (BOE). Similarly, for the total North Sea for an equivalent amount and mix among areas of past drilling (1322 wildcat wells), future discoveries are expected to amount to 17.9 billion BOE, whereas the average discovery rate per well is expected to decline by 71%.« less
Forecasting petroleum discoveries in sparsely drilled areas: Nigeria and the North Sea
Attanasi, E.D.; Root, D.H.
1988-01-01
Decline function methods for projecting future discoveries generally capture the crowding effects of wildcat wells on the discovery rate. However, these methods do not accommodate easily situations where exploration areas and horizons are expanding. In this paper, a method is presented that uses a mapping algorithm for separating these often countervailing influences. The method is applied to Nigeria and the North Sea. For an amount of future drilling equivalent to past drilling (825 wildcat wells), future discoveries (in resources found) for Nigeria are expected to decline by 68% per well but still amount to 8.5 billion barrels of oil equivalent (BOE). Similarly, for the total North Sea for an equivalent amount and mix among areas of past drilling (1322 wildcat wells), future discoveries are expected to amount to 17.9 billion BOE, whereas the average discovery rate per well is expected to decline by 71%. ?? 1988 International Association for Mathematical Geology.
Powder River outlook stays healthy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stremel, K.
1984-08-01
Well drilling activity in Wyoming's Powder River Basin is discussed. Operators are taking advantage of favorable economic advantages to tap the area's multiple pay potential and challenge its high success rate reputation. A significant amount of exploration and development can be expected in the future due to the recent discovery of high-flowing wells.
Möhlhenrich, S C; Abouridouane, M; Heussen, N; Hölzle, F; Klocke, F; Modabber, A
2016-11-01
The aim of this study was to investigate the influence of bone density and drilling protocol on heat generation during implant bed preparation. Ten single and 10 gradual implant sites with diameters of 2.8, 3.5, and 4.2mm were prepared in four artificial bone blocks (density types I-IV; D1-D4). Drilling was done at constant speed (1500rpm) and with external irrigation (50ml/min); vertical speed was set at 2mm/s. An infrared camera was used for temperature measurements. Significantly higher temperatures for single drilling were found between 2.8-mm drills in D1 (P=0.0014) and D4 (P<0.0001) and between 3.5-mm drills in D3 (P=0.0087) and D4 (P<0.0001), as well as between 4.2-mm drills in D1 (P<0.0001) and D4 (P=0.0014). Low bone density led to a thermal decrease after single drilling and a thermal increase after gradual drilling. Burs with a large diameter always showed a higher temperature generation. In comparisons between 2.8- and 4.2-mm diameters for both single and gradual drills, significant differences (P<0.001) were noted for bone types II, III, and IV. Single drilling could generate more heat than traditional sequential drilling, and bone density, as well as drill diameter, influenced thermal increases. Particularly in lower-density bone, conventional sequential drilling seems to raise the temperature less. Copyright © 2016 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.
Western USA groundwater drilling
NASA Astrophysics Data System (ADS)
Jasechko, S.; Perrone, D.
2016-12-01
Groundwater in the western US supplies 40% of the water used for irrigated agriculture, and provides drinking water to individuals living in rural regions distal to perennial rivers. Unfortunately, current groundwater use is not sustainable in a number of key food producing regions. While substantial attention has been devoted to mapping groundwater depletion rates across the western US, the response of groundwater users via well drilling to changing land uses, water demands, pump and drilling technologies, pollution vulnerabilities, and economic conditions remains unknown. Here we analyze millions of recorded groundwater drilling events in the western US that span years 1850 to 2015. We show that groundwater wells are being drilled deeper in some, but not all, regions where groundwater levels are declining. Groundwater wells are generally deeper in arid and mountainous regions characterized by deep water tables (e.g., unconfined alluvial and fractured bedrock aquifers), and in regions that have productive aquifers with high water quality deep under the ground (e.g., confined sedimentary aquifers). Further, we relate water quality and groundwater drilling depths in 40 major aquifer systems across the western US. We show that there is substantial room for improvement to the existing 2-D continental-scale assessments of domestic well water vulnerability to pollution if one considers the depth that the domestic well is screened in addition to pollutant loading, surficial geology, and vertical groundwater flow rates. These new continental-scale maps can be used to (i) better assess economic, water quality, and water balance limitations to groundwater usage, (ii) steer domestic well drilling into productive strata bearing clean and protected groundwater resources, and (iii) assess groundwater management schemes across the western US.
Alekhina, Irina A; Marie, Dominique; Petit, Jean Robert; Lukin, Valery V; Zubkov, Vladimir M; Bulat, Sergey A
2007-02-01
Decontamination of ice cores is a critical issue in phylogenetic studies of glacial ice and subglacial lakes. At the Vostok drill site, a total of 3650 m of ice core have now been obtained from the East Antarctic ice sheet. The ice core surface is coated with a hard-to-remove film of impure drilling fluid comprising a mixture of aliphatic and aromatic hydrocarbons and foranes. In the present study we used 16S rRNA gene sequencing to analyze the bacterial content of the Vostok drilling fluid sampled from four depths in the borehole. Six phylotypes were identified in three of four samples studied. The two dominant phylotypes recovered from the deepest (3400 and 3600 m) and comparatively warm (-10 degrees C and -6 degrees C, respectively) borehole horizons were from within the genus Sphingomonas, a well-known degrader of polyaromatic hydrocarbons. The remaining phylotypes encountered in all samples proved to be human- or soil-associated bacteria and were presumed to be drilling fluid contaminants of rare occurrence. The results obtained indicate the persistence of bacteria in extremely cold, hydrocarbon-rich environments. They show the potential for contamination of ice and subglacial water samples during lake exploration, and the need to develop a microbiological database of drilling fluid findings.
DOE Office of Scientific and Technical Information (OSTI.GOV)
TerraTek
2007-06-30
A deep drilling research program titled 'An Industry/DOE Program to Develop and Benchmark Advanced Diamond Product Drill Bits and HP/HT Drilling Fluids to Significantly Improve Rates of Penetration' was conducted at TerraTek's Drilling and Completions Laboratory. Drilling tests were run to simulate deep drilling by using high bore pressures and high confining and overburden stresses. The purpose of this testing was to gain insight into practices that would improve rates of penetration and mechanical specific energy while drilling under high pressure conditions. Thirty-seven test series were run utilizing a variety of drilling parameters which allowed analysis of the performance ofmore » drill bits and drilling fluids. Five different drill bit types or styles were tested: four-bladed polycrystalline diamond compact (PDC), 7-bladed PDC in regular and long profile, roller-cone, and impregnated. There were three different rock types used to simulate deep formations: Mancos shale, Carthage marble, and Crab Orchard sandstone. The testing also analyzed various drilling fluids and the extent to which they improved drilling. The PDC drill bits provided the best performance overall. The impregnated and tungsten carbide insert roller-cone drill bits performed poorly under the conditions chosen. The cesium formate drilling fluid outperformed all other drilling muds when drilling in the Carthage marble and Mancos shale with PDC drill bits. The oil base drilling fluid with manganese tetroxide weighting material provided the best performance when drilling the Crab Orchard sandstone.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General Royalty Relief for Drilling Ultra-Deep Wells on... qualified ultra-deep well is a directional well (either an original well or a sidetrack) drilled across a...
30 CFR 250.1615 - Securing of wells.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Securing of wells. 250.1615 Section 250.1615... of wells. A downhole-safety device such as a cement plug, bridge plug, or packer shall be timely... drilling crew, prevent station keeping, or require repairs to major drilling units or well-control...
30 CFR 250.1615 - Securing of wells.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Securing of wells. 250.1615 Section 250.1615... of wells. A downhole-safety device such as a cement plug, bridge plug, or packer shall be timely... drilling crew, prevent station keeping, or require repairs to major drilling units or well-control...
Design, fabrication, and integration testing of the Garden Banks 388 subsea production template
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ledbetter, W.R.; Smith, D.W.; Pierce, D.M.
1995-12-31
Enserch Exploration`s Garden Banks 388 development has a production scheme based around a floating drilling and production facility and subsea drilling/production template. The Floating Production Facility (FPF) is a converted semisubmersible drilling rig that will drill and produce through a 24-well slot subsea template. This development is located in Block 388 of the Garden Banks area in the Gulf of Mexico approximately 200 miles southwest of New Orleans, Louisiana. The production system is being installed in an area of known oil and gas reserves and will produce to a shallow water platform 54 miles away at Eugene Island 315. Themore » FPF will be permanently moored above the template. The subsea template has been installed in 2190 feet of water and will produce through a 2,000 foot free-standing production riser system to the FPF. The produced fluids are partially separated on the FPF before oil and gas are pumped through the template to export gathering lines that are connected to the shallow water facility. The system designed through-put is 40,000 BOPD of oil and 120 MMSCFD of gas.« less
NASA Astrophysics Data System (ADS)
Lu, Chunhua; Jiang, Guosheng; Wang, Ziqi; Wang, Jiahao; Wang, Chenli
2016-10-01
An electromagnetic measurement while drilling system (EM-MWD) can transfer well track state parameters to the ground in real time, which makes it an indispensable technology for deep-hole drilling. This paper introduces the development of and experiments on an EM-MWD system used for deep exploration in the People’s Republic of China. The designed EM-MWD system is composed of a downhole instrument and a ground instrument, and we elaborate on the structural design of the downhole instrument, the design of the transmission and control circuits and the signal modulation. This work also covers the software and hardware design of the ground instrument and signal demodulation technologies. Finally, some indoor signal decoding experiments and some in-hole signal transmission experiments are performed. This study indicates that the designed EM-MWD system can measure information for downhole drilling parameters and send it to the ground effectively, while the ground receiver can decode the signal accurately and reliably, and the desired signal can be obtained. Furthermore, the strength of the received signal is not affected by the polar distance within a certain polar distance.
Real Time Seismic Prediction while Drilling
NASA Astrophysics Data System (ADS)
Schilling, F. R.; Bohlen, T.; Edelmann, T.; Kassel, A.; Heim, A.; Gehring, M.; Lüth, S.; Giese, R.; Jaksch, K.; Rechlin, A.; Kopf, M.; Stahlmann, J.; Gattermann, J.; Bruns, B.
2009-12-01
Efficient and safe drilling is a prerequisite to enhance the mobility of people and goods, to improve the traffic as well as utility infrastructure of growing megacities, and to ensure the growing energy demand while building geothermal and in hydroelectric power plants. Construction within the underground is often building within the unknown. An enhanced risk potential for people and the underground building may arise if drilling enters fracture zones, karsts, brittle rocks, mixed solid and soft rocks, caves, or anthropogenic obstacles. Knowing about the material behavior ahead of the drilling allows reducing the risk during drilling and construction operation. In drilling operations direct observations from boreholes can be complemented with geophysical investigations. In this presentation we focus on “real time” seismic prediction while drilling which is seen as a prerequisite while using geophysical methods in modern drilling operations. In solid rocks P- and S-wave velocity, refraction and reflection as well as seismic wave attenuation can be used for the interpretation of structures ahead of the drilling. An Integrated Seismic Imaging System (ISIS) for exploration ahead of a construction is used, where a pneumatic hammer or a magnetostrictive vibration source generate repetitive signals behind the tunneling machine. Tube waves are generated which travel along the tunnel to the working face. There the tube waves are converted to mainly S- but also P-Waves which interact with the formation ahead of the heading face. The reflected or refracted waves travel back to the working front are converted back to tube waves and recorded using three-component geophones which are fit into the tips of anchor rods. In near real time, the ISIS software allows for an integrated 3D imaging and interpretation of the observed data, geological and geotechnical parameters. Fracture zones, heterogeneities, and variations in the rock properties can be revealed during the drilling operation. First experiments indicate that parts of the ISIS system can be used for smaller diameters e.g. in vertical drilling. In unconsolidated rocks S-waves are strongly attenuated. For the Sonic Softground Probing (SSP) system P-waves are used. A vibration-seismic correlation positioning system was developed. One transmitter and several receiver are placed within the cutting wheel. During drilling, a specially coded transmitter signal is sent directly from the cutterhead via the face support medium in the direction of tunneling. With this geometry, boulders can be detected 50 m ahead of the working face. Fracture zones and other discontinuities can be localized, and the physical properties of the upcoming rocks can be partly determined nearly in real time, while using sound velocity and attenuation as indicators. All evaluation is based on real time 3D velocity models which are determined during the drilling operation. Different technologies allow a seismic prediction while drilling in various rock types and geologies. Seismic prediction during vertical drilling will significantly profit from the lesson learned from state of the art tunneling systems.
Increasing Geothermal Energy Demand: The Need for Urbanization of the Drilling Industry
ERIC Educational Resources Information Center
Teodoriu, Catalin; Falcone, Gioia
2008-01-01
Drilling wells in urban spaces requires special types of rigs that do not conflict with the surrounding environment. For this, a mutation of the current drilling equipment is necessary into what can be defined as an "urbanized drilling rig." Noise reduction, small footprint, and "good looking" rigs all help persuade the general public to accept…
NASA Astrophysics Data System (ADS)
Friðleifsson, Guðmundur Ó.; Elders, Wilfred A.; Zierenberg, Robert A.; Stefánsson, Ari; Fowler, Andrew P. G.; Weisenberger, Tobias B.; Harðarson, Björn S.; Mesfin, Kiflom G.
2017-11-01
The Iceland Deep Drilling Project research well RN-15/IDDP-2 at Reykjanes, Iceland, reached its target of supercritical conditions at a depth of 4.5 km in January 2017. After only 6 days of heating, the measured bottom hole temperature was 426 °C, and the fluid pressure was 34 MPa. The southern tip of the Reykjanes peninsula is the landward extension of the Mid-Atlantic Ridge in Iceland. Reykjanes is unique among Icelandic geothermal systems in that it is recharged by seawater, which has a critical point of 406 °C at 29.8 MPa. The geologic setting and fluid characteristics at Reykjanes provide a geochemical analog that allows us to investigate the roots of a mid-ocean ridge submarine black smoker hydrothermal system. Drilling began with deepening an existing 2.5 km deep vertical production well (RN-15) to 3 km depth, followed by inclined drilling directed towards the main upflow zone of the system, for a total slant depth of 4659 m ( ˜ 4.5 km vertical depth). Total circulation losses of drilling fluid were encountered below 2.5 km, which could not be cured using lost circulation blocking materials or multiple cement jobs. Accordingly, drilling continued to the total depth without return of drill cuttings. Thirteen spot coring attempts were made below 3 km depth. Rocks in the cores are basalts and dolerites with alteration ranging from upper greenschist facies to amphibolite facies, suggesting that formation temperatures at depth exceed 450 °C. High-permeability circulation-fluid loss zones (feed points or feed zones) were detected at multiple depth levels below 3 km depth to bottom. The largest circulation losses (most permeable zones) occurred between the bottom of the casing and 3.4 km depth. Permeable zones encountered below 3.4 km accepted less than 5 % of the injected water. Currently, the project is attempting soft stimulation to increase deep permeability. While it is too early to speculate on the energy potential of this well and its economics, the IDDP-2 is a milestone in the development of geothermal resources and the study of hydrothermal systems. It is the first well that successfully encountered supercritical hydrothermal conditions, with potential high-power output, and in which on-going hydrothermal metamorphism at amphibolite facies conditions can be observed. The next step will be to carry out flow testing and fluid sampling to determine the chemical and thermodynamic properties of the formation fluids.
Walker Whitworth, Kristina; Kaye Marshall, Amanda; Symanski, Elaine
2018-03-20
Studies of unconventional gas development (UGD) and preterm birth (PTB) have not presented risk estimates by well development phase or trimester. We examined phase and trimester-specific associations between UGD activity and PTB. We conducted a case-control study of women with singleton births in the Barnett Shale area, Texas, from 30 November 2010 to 29 November 2012. We individually age- and race/ethnicity-matched five controls to each PTB case ( n =13,328) and truncated controls' time at risk according to the matched case's gestational age. We created phase-specific UGD-activity metrics: a ) inverse squared distance-weighted (IDW) count of wells in the drilling phase ≤0.5 mi (804.7 meters) of the residence and b ) IDW sum of natural gas produced ≤0.5 mi of the residence. We also constructed trimester- and gestation-specific metrics. Metrics were categorized as follows: zero wells (reference), first, second, third tertiles of UGD activity. Analyses were repeated by PTB severity: extreme, very, and moderate (<28, 28 to<32, and 32 to<37 completed weeks). Data were analyzed using conditional logistic regression. We found increased odds of PTB in the third tertile of the UGD drilling {odds ratio (OR)=1.20 [95% confidence interval (CI): 1.06, 1.37]} and UGD-production [OR=1.15 (1.05, 1.26)] metrics. Among women in the third tertile of UGD-production, associations were strongest in trimesters one [OR=1.18 (1.02, 1.37)] and two [OR=1.14 (0.99, 1.31). The greatest risk was observed for extremely PTB [third tertile ORs: UGD drilling, 2.00 (1.23, 3.24); UGD production, 1.53 (1.03-2.27)]. We found evidence of differences in phase- and trimester-specific associations of UGD and PTB and indication of particular risk associated with extremely preterm birth. Future studies should focus on quantifying specific chemical and nonchemical stressors associated with UGD. https://doi.org/10.1289/EHP2622.
Development of a high-temperature diagnostics-while-drilling tool.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chavira, David J.; Huey, David; Hetmaniak, Chris
2009-01-01
The envisioned benefits of Diagnostics-While-Drilling (DWD) are based on the principle that high-speed, real-time information from the downhole environment will promote better control of the drilling process. Although in practice a DWD system could provide information related to any aspect of exploration and production of subsurface resources, the current DWD system provides data on drilling dynamics. This particular set of new tools provided by DWD will allow quicker detection of problems, reduce drilling flat-time and facilitate more efficient drilling (drilling optimization) with the overarching result of decreased drilling costs. In addition to providing the driller with an improved, real-time picturemore » of the drilling conditions downhole, data generated from DWD systems provides researchers with valuable, high fidelity data sets necessary for developing and validating enhanced understanding of the drilling process. Toward this end, the availability of DWD creates a synergy with other Sandia Geothermal programs, such as the hard-rock bit program, where the introduction of alternative rock-reduction technologies are contingent on the reduction or elimination of damaging dynamic effects. More detailed descriptions of the rationale for the program and early development efforts are described in more detail by others [SAND2003-2069 and SAND2000-0239]. A first-generation low-temperature (LT) DWD system was fielded in a series of proof-of-concept tests (POC) to validate functionality. Using the LT system, DWD was subsequently used to support a single-laboratory/multiple-partner CRADA (Cooperative Research and Development Agreement) entitled Advanced Drag Bits for Hard-Rock Drilling. The drag-bit CRADA was established between Sandia and four bit companies, and involved testing of a PDC bit from each company [Wise, et al., 2003, 2004] in the same lithologic interval at the Gas Technology Institute (GTI) test facility near Catoosa, OK. In addition, the LT DWD system has been fielded in cost-sharing efforts with an industrial partner to support the development of new generation hard-rock drag bits. Following the demonstrated success of the POC DWD system, efforts were initiated in FY05 to design, fabricate and test a high-temperature (HT) capable version of the DWD system. The design temperature for the HT DWD system was 225 C. Programmatic requirements dictated that a HT DWD tool be developed during FY05 and that a working system be demonstrated before the end of FY05. During initial design discussions regarding a high-temperature system it was decided that, to the extent possible, the HT DWD system would maintain functionality similar to the low temperature system, that is, the HT DWD system would also be designed to provide the driller with real-time information on bit and bottom-hole-assembly (BHA) dynamics while drilling. Additionally, because of time and fiscal constraints associated with the HT system development, the design of the HT DWD tool would follow that of the LT tool. The downhole electronics package would be contained in a concentrically located pressure barrel and the use of externally applied strain gages with thru-tool connectors would also be used in the new design. Also, in order to maximize the potential wells available for the HT DWD system and to allow better comparison with the low-temperature design, the diameter of the tool was maintained at 7-inches. This report discusses the efforts associated with the development of a DWD system capable of sustained operation at 225 C. This report documents work performed in the second phase of the Diagnostics-While-Drilling (DWD) project in which a high-temperature (HT) version of the phase 1 low-temperature (LT) proof-of-concept (POC) DWD tool was built and tested. Descriptions of the design, fabrication and field testing of the HT tool are provided. Background on prior phases of the project can be found in SAND2003-2069 and SAND2000-0239.« less
Analysis of the electromagnetic wave resistivity tool in deviated well drilling
NASA Astrophysics Data System (ADS)
Zhang, Yumei; Xu, Lijun; Cao, Zhang
2014-04-01
Electromagnetic wave resistivity (EWR) tools are used to provide real-time measurements of resistivity in the formation around the tool in Logging While Drilling (LWD). In this paper, the acquired resistivity information in the formation is analyzed to extract more information, including dipping angle and azimuth direction of the drill. A finite element (FM) model of EWR tool working in layered earth formations is established. Numerical analysis and FM simulations are employed to analyze the amplitude ratio and phase difference between the voltages measured at the two receivers of the EWR tool in deviated well drilling.
A Proposed Borehole Scientific Laboratory in Quay County, New Mexico, USA
NASA Astrophysics Data System (ADS)
Nielson, Dennis; Eckels, Marc; Mast, Peter; Zellman, Mark; Creed, Robert
2017-04-01
Our team has received funding from the US Department of Energy to initiate a Deep Borehole Field Test that will develop a subsurface test site to evaluate the drilling and scientific aspects of deep borehole disposal of nuclear waste in crystalline rock. Phase 1 of the project will focus on Public Outreach and land acquisition whereas Phase 2 will generate a drilling and testing plan and secure regulatory approvals. Phase 3 will complete the Drilling and Testing Plan and Phase 4 will include the drilling and testing. Phase 5 will be devoted to borehole science and experiments with emplacement technology. Although we are specifically considering issues associated with the disposal of waste, this project is a proof of concept, and no waste will be emplaced at our site. In brief, the concept envisions an 8-1/2 inch open-hole completion at a depth of 5000 m in crystalline rock. There will be an extensive program of sample collection (including core) and analysis as well as geophysical logging and borehole testing. Critical issues will be low permeability in the crystalline rock as well as the ability to manage borehole quality. Our team has proposed a site in Quay County, New Mexico that has an 850 meter thick Paleozoic section overlying homogeneous Precambrian granite. A subsequent phase of the project may drill a second hole with a 17-1/2 inch completion located about 200 m from the first. Our long-term plan is that this site will be managed as a deep scientific observatory that also provides a facility for scientific experiments and testing of borehole infrastructure and drilling equipment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pacific Operators Offshore, Inc.
The intent of this project was to increase production and extend the economic life of this mature field through the application of advanced reservoir characterization and drilling technology, demonstrating the efficacy of these technologies to other small operators of aging fields. Two study periods were proposed; the first to include data assimilation and reservoir characterization and the second to drill the demonstration well. The initial study period showed that a single tri-lateral well would not be economically efficient in redevelopment of Carpinteria's multiple deep water turbidite sand reservoirs, and the study was amended to include the drilling of a seriesmore » of horizontal redrills from existing surplus well bores on Pacific Operators' Platform Hogan.« less
Drilling a deep geologic test well at Hilton Head Island, South Carolina
Schultz, Arthur P.; Seefelt, Ellen L.
2011-01-01
The U.S. Geological Survey, in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC), is drilling a deep geologic test well at Hilton Head Island, S.C. The test well is scheduled to run between mid-March and early May 2011. When completed, the well will be about 1,000 feet deep. The purpose of this test well is to gain knowledge about the regional-scale Floridan aquifer, an important source of groundwater in the Hilton Head area. Also, cores obtained during drilling will enable geologists to study the last 60 million years of Earth history in this area.
Geohydrologic and drill-hole data for test well USW H-3, Yucca Mountain, Nye County, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thordarson, W.; Rush, F.E.; Spengler, R.W.
This report presents data collected to determine the hydraulic characteristics of rocks penetrated in test well USW H-3. The well is one of a series of test wells drilled in and near the southwestern part of the Nevada Test Site, Nye County, Nevada, in a program conducted in cooperation with the US Department of Energy. These investigations are part of the Nevada Nuclear Waste Storage Investigations to identify suitable sites for storage of high-level radioactive wastes. Data on drilling operations, lithology, borehole geophysics, hydrologic monitoring, pumping, swabbing, and injection tests for the well are contained in this report.
Code of Federal Regulations, 2011 CFR
2011-07-01
... a result of drilling a phase 2 or phase 3 ultra-deep well? 203.30 Section 203.30 Mineral Resources... REVENUE MANAGEMENT RELIEF OR REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General Royalty Relief for Drilling Ultra-Deep Wells on Leases Not Subject to Deep Water Royalty Relief § 203.30 Which leases...
An Ultrasonic Sampler and Sensor Platform for In-Situ Astrobiological Exploration
NASA Technical Reports Server (NTRS)
Bar-Cohen, Yoaz E.; Bao, X.; Chang, Z.; Sherrit, S.
2003-01-01
The search for existing or past life in the Universe is one of the most important objectives of NASA's mission. In support of this objective, ultrasonic based mechanisms are currently being developed at JPL to allow probing and sampling rocks as well as perform as a sensor platform for in-situ astrobiological analysis. The technology is based on the novel Ultrasonic/Sonic Driller/Corer (USDC), which requires low axial force, thereby overcoming one of the major limitations of planetary sampling in low gravity using conventional drills. The USDC was demonstrated to: 1) drill ice and various rocks including granite, diorite, basalt and limestone, 2) not require bit sharpening, and 3) operate at high and low temperatures. The capabilities that are being investigated including probing the ground to select sampling sites, collecting various forms of samples, and hosting sensors for measuring chemical/physical properties. A series of modifications of the USDC basic configuration were implemented leading an ultrasonic abrasion tool (URAT), Ultrasonic Gopher for deep Drilling, and the lab-on-a-drill.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raymond, David W.; Blankenship, Douglas A.; Buerger, Stephen
The dynamic stability of deep drillstrings is challenged by an inability to impart controllability with ever-changing conditions introduced by geology, depth, structural dynamic properties and operating conditions. A multi-organizational LDRD project team at Sandia National Laboratories successfully demonstrated advanced technologies for mitigating drillstring vibrations to improve the reliability of drilling systems used for construction of deep, high-value wells. Using computational modeling and dynamic substructuring techniques, the benefit of controllable actuators at discrete locations in the drillstring is determined. Prototype downhole tools were developed and evaluated in laboratory test fixtures simulating the structural dynamic response of a deep drillstring. A laboratory-basedmore » drilling applicability demonstration was conducted to demonstrate the benefit available from deployment of an autonomous, downhole tool with self-actuation capabilities in response to the dynamic response of the host drillstring. A concept is presented for a prototype drilling tool based upon the technical advances. The technology described herein is the subject of U.S. Patent Application No. 62219481, entitled "DRILLING SYSTEM VIBRATION SUPPRESSION SYSTEMS AND METHODS", filed September 16, 2015.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Capuano, L.E. Jr.
This presentation by Louis E. Capuano, Jr., President, ThermaSource, Inc., discusses cost-cutting in the drilling phase of geothermal energy exploration and production. All aspects of a geothermal project including the drilling must be streamlined to make it viable and commercial. If production could be maximized from each well, there would be a reduction in drilling costs. This could be achieved in several ways, including big hole and multi-hole completion, directional drilling, better knowledge of the resource and where to penetrate, etc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2010-06-01
The U.S. Department of Energy (DOE) Office of Legacy Management developed this report as a guide for discussions with the Colorado State regulators and other interested stakeholders in response to increased drilling for natural gas reserves near the underground nuclear explosion site at Rulison, Colorado. The Rulison site is located in the Piceance Basin of western Colorado, 40 miles northeast of Grand Junction. The Rulison test was the second natural gas reservoir stimulation experiment in the Plowshare Program, which was designed to develop peaceful uses for nuclear energy. On September 10, 1969, the U.S. Atomic Energy Commission, a predecessor agencymore » of DOE, detonated a 40-kiloton nuclear device 8426 feet below the ground surface in an attempt to release commercially marketable quantities of natural gas. The blast vaporized surrounding rock and formed a cavity about 150 feet in diameter. Although the contaminated materials from drilling operations were subsequently removed from the surface of the blast site, no feasible technology exists to remove subsurface radioactive contamination in or around the test cavity. An increase in drilling for natural gas near the site has raised concern about the possibility of encountering residual radioactivity from the area of the detonation. DOE prohibits drilling in the 40-acre lot surrounding the blast site at a depth below 6000 feet. DOE has no evidence that indicates contamination from the Rulison site detonation has migrated or will ever migrate beyond the 40-acre institutional control boundary. The Colorado Oil and Gas Conservation Commission (COGCC) established two wider boundaries around the site. When a company applies for a permit to drill within a 3-mile radius of surface ground zero, COGCC notifies DOE and provides an opportunity to comment on the application. COGCC also established a half-mile radius around surface ground zero. An application to drill within one-half mile requires a full hearing before the commission. This report outlines DOE's recommendation that gas developers adopt a conservative, staged drilling approach allowing gas reserves near the Rulison site to be recovered in a manner that minimizes the likelihood of encountering contamination. This staged approach calls for collecting data from wells outside the half-mile zone before drilling closer, and then drilling within the half-mile zone in a sequential manner, first at low contamination probability locations and then moving inward. DOE's recommended approach for drilling in this area will protect public safety while allowing collection of additional data to confirm that contamination is contained within the 40-acre institutional control boundary.« less
25 CFR 226.22 - Prohibition of pollution.
Code of Federal Regulations, 2014 CFR
2014-04-01
... all times conduct their operations and drill, equip, operate, produce, plug and abandon all wells drilled for oil or gas, service wells or exploratory wells (including seismic, core and stratigraphic... LANDS FOR OIL AND GAS MINING Operations § 226.22 Prohibition of pollution. (a) All operators...
25 CFR 226.22 - Prohibition of pollution.
Code of Federal Regulations, 2013 CFR
2013-04-01
... all times conduct their operations and drill, equip, operate, produce, plug and abandon all wells drilled for oil or gas, service wells or exploratory wells (including seismic, core and stratigraphic... LANDS FOR OIL AND GAS MINING Operations § 226.22 Prohibition of pollution. (a) All operators...
25 CFR 226.22 - Prohibition of pollution.
Code of Federal Regulations, 2012 CFR
2012-04-01
... all times conduct their operations and drill, equip, operate, produce, plug and abandon all wells drilled for oil or gas, service wells or exploratory wells (including seismic, core and stratigraphic... LANDS FOR OIL AND GAS MINING Operations § 226.22 Prohibition of pollution. (a) All operators...
30 CFR 203.44 - What administrative steps must I take to use the royalty suspension volume?
Code of Federal Regulations, 2011 CFR
2011-07-01
... REDUCTION IN ROYALTY RATES OCS Oil, Gas, and Sulfur General Royalty Relief for Drilling Deep Gas Wells on... in writing of your intent to begin drilling operations on all deep wells and phase 1 ultra-deep wells...
Volume requirements for aerated mud drilling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guo, B.; Rajtar, J.M.
1995-09-01
Aerated mud drilling has been recognized as having many advantages over conventional mud drilling, such ass higher penetration rate, less formation damage, minimized lost circulation, and lower drilling cost. In some areas, the use of aerated mud as a circulating medium for drilling oil and gas wells is becoming an attractive practice. Maintaining an optimum combination of liquid and air flow rates is important in aerated drilling operations. However, most drilling operators are unclear on what constitutes the ``optimum combination of the liquid and air flow rates.`` Guo et al. presented a mathematical approach to determining the flowing bottomhole pressuremore » (BHP) for aerated mud drilling. This paper addresses the use of Guo et al.`s mathematical model to determine liquid and air volume requirements considering wellbore stability, pipe sticking, and formation damage as well as the cuttings-carry capacity of the aerated mud. For a formation-damage-prevention point of view, the liquid fraction in the fluid stream should e as low as possible. However, a sufficient mud flow rate is always required to make the hole stable and to maintain the cuttings-carrying capacity of the aerated mud without injecting much air volume. This paper provides a simple approach to determining the liquid and air volume requirements for aerated mud drilling.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oglesby, Kenneth; Finsterle, Stefan; Zhang, Yingqi
2014-03-12
This project had two major areas of research for Engineered/ Enhanced Geothermal System (EGS) development - 1) study the potential benefits from using microholes (i.e., bores with diameters less than 10.16 centimeters/ 4 inches) and 2) study FLASH ASJ to drill/ install those microbores between a well and a fracture system. This included the methods and benefits of drilling vertical microholes for exploring the EGS reservoir and for installing multiple (forming an array of) laterals/ directional microholes for creating the in-reservoir heat exchange flow paths. Significant benefit was found in utilizing small microbore sized connecting bores for EGS efficiency andmore » project life. FLASH ASJ was deemed too complicated to optimally work in such deep reservoirs at this time.« less
A 3-D wellbore simulator (WELLTHER-SIM) to determine the thermal diffusivity of rock-formations
NASA Astrophysics Data System (ADS)
Wong-Loya, J. A.; Santoyo, E.; Andaverde, J.
2017-06-01
Acquiring thermophysical properties of rock-formations in geothermal systems is an essential task required for the well drilling and completion. Wellbore thermal simulators require such properties for predicting the thermal behavior of a wellbore and the formation under drilling and shut-in conditions. The estimation of static formation temperatures also needs the use of these properties for the wellbore and formation materials (drilling fluids and pipes, cements, casings, and rocks). A numerical simulator (WELLTHER-SIM) has been developed for modeling the drilling fluid circulation and shut-in processes of geothermal wellbores, and for the in-situ determination of thermal diffusivities of rocks. Bottomhole temperatures logged under shut-in conditions (BHTm), and thermophysical and transport properties of drilling fluids were used as main input data. To model the thermal disturbance and recovery processes in the wellbore and rock-formation, initial drilling fluid and static formation temperatures were used as initial and boundary conditions. WELLTHER-SIM uses these temperatures together with an initial thermal diffusivity for the rock-formation to solve the governing equations of the heat transfer model. WELLTHER-SIM was programmed using the finite volume technique to solve the heat conduction equations under 3-D and transient conditions. Thermal diffusivities of rock-formations were inversely computed by using an iterative and efficient numerical simulation, where simulated thermal recovery data sets (BHTs) were statistically compared with those temperature measurements (BHTm) logged in some geothermal wellbores. The simulator was validated using a well-documented case reported in the literature, where the thermophysical properties of the rock-formation are known with accuracy. The new numerical simulator has been successfully applied to two wellbores drilled in geothermal fields of Japan and Mexico. Details of the physical conceptual model, the numerical algorithm, and the validation and application results are outlined in this work.
In-situ test site at the International Geothermal Centre Bochum
NASA Astrophysics Data System (ADS)
Bracke, Rolf; Wittig, Volker; Güldenhaupt, Jonas; Duda, Mandy; Stöckhert, Ferdinand; Bussmann, Gregor; Tünte, Henry; Saenger, Erik H.; Eicker, Timm; Löer, Katrin; Schäfers, Klaus; Macit, Osman; Jagert, Felix
2017-04-01
The in-situ test site at the International Geothermal Centre (GZB) is located on the campus of the Bochum University of Applied Sciences. The area represents a 10.000 m2 drill site with existing research, observation and production wells and allows further drill tests and drilling down to depths of 5.000 m - also in conjunction with the approved authorized 50 km2 mining area "Future Energies" and the GZB's own mobile dual drive drilling rig Bo.Rex capable of drilling down to depths of 1000 m. The site allows for a comprehensive characterization of the subsurface underneath the university's campus in terms of a case study in Bochum pursuing the objective to provide an in-situ test field to researchers from geosciences and other disciplines. The local geology comprises folded and fractured carboniferous sediments including sandstones, siltstones, claystones and coal seams with low matrix permeabilies. Currently, one research well, 29 production wells, and seven monitoring wells are available. The research well reaching to a depth of about 500 m with an open-hole section between 450 m and 500 m has been fully cored down to 200 m, selected sections were additionally cored down to 450 m. Production wells with depths of up to 200 m are equipped with borehole heat exchangers providing heating and cooling for the GZB and a new lecture building. Monitoring wells vary in depth and reach down to 200 m. The majority of wells were comprehensively characterized using the GZB's borehole geophysical logging system with deviation, caliper, gamma ray and acoustic imaging, but also full waveform sonic, flowmeter and electrical conductivity. Cuttings were collected, documented and partly stored. The in-situ test site will be complemented by a seismic and hydrogeological observatory comprising borehole seismometers at depths of up to 200 m. The seismic network will ensure permanent observation of natural and potential anthropogenic seismicity. Additionally, drilling activities interpreted as seismic source can be used to develop a better understanding of the geological and geophysical structure of the subsurface. Hydrogeological monitoring wells will be used for field experiments such as flowmeter tests, pumping tests or chemical analysis of groundwater. Synergies arise from linking the field-scale infrastructure with laboratory equipment at the GZB covering basic and advanced physicochemical characterization as well as high resolution 3D imaging technologies under high pressure and high temperature reservoir conditions at various scales from mm to m. The GZB invites students, researchers and interested parties to participate in and shape the GZB's in-situ research infrastructure activities by addressing fundamental and applied questions related to geothermal energy provision and georesources in general.
NASA Astrophysics Data System (ADS)
Amirov, Elnur
2016-04-01
Sperry-Sun (Sperry Drilling Services) is the leader in MWD/LWD reliability, has developed the industry's first LWD NMR/MRIL-WD (nuclear magnetic resonance) tool. The MRIL-WD (magnetic resonance imaging logging-while-drilling) service directly measures the T1 component of hydrogen in subsurface rock units while drilling to obtain total reservoir porosity and to dissect the observed total porosity into its respective components of free fluid and bound fluid porosity. These T1 data are used to secure accurate total, free-fluid, capillary-bound water, and clay-bound water porosity of the reservoir sections which can be drilled in the several Runs. Over the last decade, results from Magnetic Resonance Imaging logs (NMR) have added significant value to petrophysical analysis and understanding by providing total, free-fluid and bound-fluid porosities, combined with fluid typing capabilities. With MRIL-WD very valuable Real-Time or Recorded Memory data/information is now available during or shortly after the drilling operation (formation properties measurement can be taken right after a drill bit penetration), while trip in and trip out as well. A key point in utilizing MRIL in an LWD environment is motion-tolerant measurements. Recent MRIL-WD logging runs from the Shah Deniz wells located in the Khazarian-Caspian Sea of the Azerbaijan Republic helped to delineate and assess hydrocarbon bearing zones. Acquired results demonstrate how MRIL data can be acquired while-drilling and provide reliable/high quality measurements. Magnetic Resonance Imaging logs at some developments wells have become a cornerstone in formation evaluation and petrophysical understanding. By providing total, free-fluid, and bound-fluid porosities together with fluid typing, MRIL results have significantly added to the assessment of reservoirs. In order to reduce NPT (Non-Productive Time) and save the rig operations time, there is always the desire to obtain logging results as soon as possible, preferably while the drilling of the brand new wells (logging-while-drilling, LWD). The MRIL-WD Tool can accomplish any tasks reliably and in a timely manner thus saving drilling time and reducing the overall risk for the well. Control of water production and identification of pay zones with high irreducible water saturation are also very important for formation evaluation and petrophysical analysis in oil fields located in the Azerbaijan Republic and also other fields around the world. Sometimes above-mentioned problems can cause delay in completion decisions which will create additional expenses for field management. In many wells, breakthroughs in reservoir characterization have been achieved in directly determining hydrocarbon volumes, net permeability thickness, and hydrocarbon type, thus circumventing the problems associated with obtaining wireline data and the considerable amount of rig time required (so MRIL-WD can considerably reduce the NPT). Some reservoir zones with relatively low water saturation, which calculated from the other conventional logs, can produce with relatively high percentage of water cut, primarily because much of the water is movable. However, other zones with high calculated water saturation produce water free hydrocarbons. The difficulty in predicting water production can be related with the producing from the complex lithology, which can contain low-permeability, medium- to fine-grained shaly sands. Where grains are small, the formations have high surface to volume ratios that result in high irreducible water saturation and due to this we can see low resistivity values. As a result the use of resistivity logs as pay indicator, sometimes can cause low resistivity pay zones might be overlooked and consequently net field pay could be underestimated. In the last few years, nuclear magnetic resonance logs have shown great promise in solving problems of formation evaluation that could not be directly resolved with conventional logs. The capability of MRIL-WD can help many engineers to differentiate between the immovable and movable water in oil reservoirs in many fields. Sometimes MRIL-WD have also been capable of providing better formation permeability than conventional logs, a feature which can save time and expense in well-completion decisions. The RT & RM bound fluid and total porosity measurements can provide a tremendous new insight into the formation evaluation of shaly sands and low resistivity pays. Unlike traditional porosity devices, which are affected by rock matrix changes, the MRIL-WD tool can be used in complex or mixed lithology sequences and provide measurements of porosity that are lithology independent.
Publications - GMC 67 | Alaska Division of Geological & Geophysical Surveys
from Alaska; drill cuttings being from the following three wells: Mobil Oil Corporation Salmonberry ; drill cuttings being from the following three wells: Mobil Oil Corporation Salmonberry Lake Unit #1
NASA Astrophysics Data System (ADS)
Fucugauchi, J. U.; Perez-Cruz, L. L.; Velasco-Villarreal, M.
2013-12-01
Drilling projects of impact structures provide data on the structure and stratigraphy of target, impact and post-impact lithologies, providing insight on the impact dynamics and cratering. Studies have successfully included magnetic well logging and analyses in core and cuttings, directed to characterize the subsurface stratigraphy and structure at depth. There are 170-180 impact craters documented in the terrestrial record, which is a small proportion compared to expectations derived from what is observed on the Moon, Mars and other bodies of the solar system. Knowledge of the internal 3-D deep structure of craters, critical for understanding impacts and crater formation, can best be studied by geophysics and drilling. On Earth, few craters have yet been investigated by drilling. Craters have been drilled as part of industry surveys and/or academic projects, including notably Chicxulub, Sudbury, Ries, Vredefort, Manson and many other craters. As part of the Continental ICDP program, drilling projects have been conducted on the Chicxulub, Bosumtwi, Chesapeake, Ries and El gygytgyn craters. Inclusion of continuous core recovery expanded the range of paleomagnetic and rock magnetic applications, with direct core laboratory measurements, which are part of the tools available in the ocean and continental drilling programs. Drilling studies are here briefly reviewed, with emphasis on the Chicxulub crater formed by an asteroid impact 66 Ma ago at the Cretaceous/Paleogene boundary. Chicxulub crater has no surface expression, covered by a kilometer of Cenozoic sediments, thus making drilling an essential tool. As part of our studies we have drilled eleven wells with continuous core recovery. Magnetic susceptibility logging, magnetostratigraphic, rock magnetic and fabric studies have been carried out and results used for lateral correlation, dating, formation evaluation, azimuthal core orientation and physical property contrasts. Contributions of magnetic studies on impact age, cratering, target-impactite stratigraphy, ejecta, impact dynamics, hydrothermal alterations and post-impact processes are presented. The challenges and perspectives of drilling studies of impact craters are discussed.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.406 What additional safety measures must I take when I conduct drilling... when I conduct drilling operations on a platform that has producing wells or has other hydrocarbon flow...
30 CFR 250.1615 - Securing of wells.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Securing of wells. 250.1615 Section 250.1615... § 250.1615 Securing of wells. A downhole-safety device such as a cement plug, bridge plug, or packer... evacuation of the drilling crew, prevent station keeping, or require repairs to major drilling units or well...
76 FR 11812 - Drill Pipe and Drill Collars From China
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-03
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-474 and 731-TA-1176 (Final)] Drill Pipe and Drill Collars From China Determinations On the basis of the record \\1\\ developed in the subject... imports of drill pipe and drill collars from China, provided for in subheadings 7304.22, 7304.23, and 8431...
Petroleum-resource appraisal and discovery rate forecasting in partially explored regions
Drew, Lawrence J.; Schuenemeyer, J.H.; Root, David H.; Attanasi, E.D.
1980-01-01
PART A: A model of the discovery process can be used to predict the size distribution of future petroleum discoveries in partially explored basins. The parameters of the model are estimated directly from the historical drilling record, rather than being determined by assumptions or analogies. The model is based on the concept of the area of influence of a drill hole, which states that the area of a basin exhausted by a drill hole varies with the size and shape of targets in the basin and with the density of previously drilled wells. It also uses the concept of discovery efficiency, which measures the rate of discovery within several classes of deposit size. The model was tested using 25 years of historical exploration data (1949-74) from the Denver basin. From the trend in the discovery rate (the number of discoveries per unit area exhausted), the discovery efficiencies in each class of deposit size were estimated. Using pre-1956 discovery and drilling data, the model accurately predicted the size distribution of discoveries for the 1956-74 period. PART B: A stochastic model of the discovery process has been developed to predict, using past drilling and discovery data, the distribution of future petroleum deposits in partially explored basins, and the basic mathematical properties of the model have been established. The model has two exogenous parameters, the efficiency of exploration and the effective basin size. The first parameter is the ratio of the probability that an actual exploratory well will make a discovery to the probability that a randomly sited well will make a discovery. The second parameter, the effective basin size, is the area of that part of the basin in which drillers are willing to site wells. Methods for estimating these parameters from locations of past wells and from the sizes and locations of past discoveries were derived, and the properties of estimators of the parameters were studied by simulation. PART C: This study examines the temporal properties and determinants of petroleum exploration for firms operating in the Denver basin. Expectations associated with the favorability of a specific area are modeled by using distributed lag proxy variables (of previous discoveries) and predictions from a discovery process model. In the second part of the study, a discovery process model is linked with a behavioral well-drilling model in order to predict the supply of new reserves. Results of the study indicate that the positive effects of new discoveries on drilling increase for several periods and then diminish to zero within 2? years after the deposit discovery date. Tests of alternative specifications of the argument of the distributed lag function using alternative minimum size classes of deposits produced little change in the model's explanatory power. This result suggests that, once an exploration play is underway, favorable operator expectations are sustained by the quantity of oil found per time period rather than by the discovery of specific size deposits. When predictions of the value of undiscovered deposits (generated from a discovery process model) were substituted for the expectations variable in models used to explain exploration effort, operator behavior was found to be consistent with these predictions. This result suggests that operators, on the average, were efficiently using information contained in the discovery history of the basin in carrying out their exploration plans. Comparison of the two approaches to modeling unobservable operator expectations indicates that the two models produced very similar results. The integration of the behavioral well-drilling model and discovery process model to predict the additions to reserves per unit time was successful only when the quarterly predictions were aggregated to annual values. The accuracy of the aggregated predictions was also found to be reasonably robust to errors in predictions from the behavioral well-drilling equation.
Testing and Development of a Percussive Augmenter for Rotary Drills
NASA Technical Reports Server (NTRS)
Donnelly, Christopher; Bar-Cohen, Yoseph; Chang, Zensheu; Badescu, Mircea; Sherrit, Stewart
2011-01-01
Hammering drills are effective in fracturing the drilled medium while rotary drills remove cuttings. The combination provides a highly effective penetration mechanism. Piezoelectric actuators were integrated into an adapter to produce ultrasonic percussion; augmenting rotary drilling. The drill is capable of operating at low power, low applied force and, with proper tuning, low noise. These characteristics are of great interest for future NASA missions and the construction/remodeling industry. The developed augmenter connects a commercially available drill and bit and was tested to demonstrate its capability. Input power to the drill was read using a multimeter and the augmenter received a separate input voltage. The drive frequency of the piezoelectric actuator was controlled by a hill climb algorithm that optimizes and records average power usage to operate the drill at resonating frequency. Testing the rotary drill and augmenter across a range of combinations with total power constant at 160 Watts has shown results in concrete and limestone samples that are as good as or better than the commercial drill. The drill rate was increased 1.5 to over 10 times when compared to rotation alone.
Purpose-built PDC bit successfully drills 7-in liner equipment and formation: An integrated solution
DOE Office of Scientific and Technical Information (OSTI.GOV)
Puennel, J.G.A.; Huppertz, A.; Huizing, J.
1996-12-31
Historically, drilling out the 7-in, liner equipment has been a time consuming operation with a limited success ratio. The success of the operation is highly dependent on the type of drill bit employed. Tungsten carbide mills and mill tooth rock bits required from 7.5 to 11.5 hours respectively to drill the pack-off bushings, landing collar, shoe track and shoe. Rates of penetration dropped dramatically when drilling the float equipment. While conventional PDC bits have drilled the liner equipment successfully (averaging 9.7 hours), severe bit damage invariably prevented them from continuing to drill the formation at cost-effective penetration rates. This papermore » describes the integrated development and application of an IADC M433 Class PDC bit, which was designed specifically to drill out the 7-in. liner equipment and continue drilling the formation at satisfactory penetration rates. The development was the result of a joint investigation There the operator and bit/liner manufacturers shared their expertise in solving a drilling problem, The heavy-set bit was developed following drill-off tests conducted to investigate the drillability of the 7-in. liner equipment. Key features of the new bit and its application onshore The Netherlands will be presented and analyzed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kunze, J.F.; Marlor, J.K.
1982-08-01
A competitive aware for a cost sharing program was made to Madison County, Idaho to share in a program to develop moderate-to-low temperature geothermal energy for the heating of a large junior college, business building, public shcools and other large buildings in Rexburg, Idaho. A 3943 ft deep well was drilled at the edge of Rexburg in a region that had been probed by some shallower test holes. Temperatures measured near the 4000 ft depth were far below what was expected or needed, and drilling was abandoned at that depth. In 1981 attempts were made to restrict downward circulation intomore » the well, but the results of this effort yielded no higher temperatures. The well is a prolific producer of 70/sup 0/F water, and could be used as a domestic water well.« less
Collett, Timothy S.; Lee, Myung W.; Zyrianova, Margarita V.; Mrozewski, Stefan A.; Guerin, Gilles; Cook, Ann E.; Goldberg, Dave S.
2012-01-01
One of the objectives of the Gulf of MexicoGasHydrateJointIndustryProjectLegII (GOM JIP LegII) was the collection of a comprehensive suite of logging-while-drilling (LWD) data within gas-hydrate-bearing sand reservoirs in order to make accurate estimates of the concentration of gashydrates under various geologic conditions and to understand the geologic controls on the occurrence of gashydrate at each of the sites drilled during this expedition. The LWD sensors just above the drill bit provided important information on the nature of the sediments and the occurrence of gashydrate. There has been significant advancements in the use of downhole well-logging tools to acquire detailed information on the occurrence of gashydrate in nature: From using electrical resistivity and acoustic logs to identify gashydrate occurrences in wells to where wireline and advanced logging-while-drilling tools are routinely used to examine the petrophysical nature of gashydrate reservoirs and the distribution and concentration of gashydrates within various complex reservoir systems. Recent integrated sediment coring and well-log studies have confirmed that electrical resistivity and acoustic velocity data can yield accurate gashydrate saturations in sediment grain supported (isotropic) systems such as sand reservoirs, but more advanced log analysis models are required to characterize gashydrate in fractured (anisotropic) reservoir systems. In support of the GOM JIP LegII effort, well-log data montages have been compiled and presented in this report which includes downhole logs obtained from all seven wells drilled during this expedition with a focus on identifying and characterizing the potential gas-hydrate-bearing sedimentary section in each of the wells. Also presented and reviewed in this report are the gas-hydrate saturation and sediment porosity logs for each of the wells as calculated from available downhole well logs.
Improved recovery demonstration for Williston Basin carbonates. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sippel, M.A.
The purpose of this project was to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in-place, and methods for improved completion efficiency. The investigations and demonstrations were focussed on Red River and Ratcliffe reservoirs in the Williston Basin within portions of Montana, North Dakota and South Dakota. Both of these formations have been successfully explored with conventional 2-dimensional (2D) seismic. Improved reservoir characterization utilizing 3-dimensional (3D) seismic was investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterizations were integrated with geological and engineering studies. The project tested lateral completion techniques, including high-pressure jetting lance technologymore » and short-radius lateral drilling to enhance completion efficiency. Lateral completions should improve economics for both primary and secondary oil where low permeability is a problem and higher-density drilling of vertical infill wells is limited by drilling cost. New vertical wells were drilled to test bypassed oil in ares that were identified by 3D seismic. These new wells are expected to recover as much or greater oil than was produced by nearby old wells. The project tested water injection through vertical and horizontal wells in reservoirs where application of waterflooding has been limited. A horizontal well was drilled for testing water injection. Injection rates were tested at three times that of a vertical well. This demonstration well shows that water injection with horizontal completions can improve injection rates for economic waterflooding. This report is divided into two sections, part 1 covers the Red River and part 2 covers the Ratcliffe. Each part summarizes integrated reservoir characterizations and outlines methods for targeting by-passed oil reserves in the respective formation and locality.« less
NASA Astrophysics Data System (ADS)
Rangaswamy, T.; Nagaraja, R.
2018-04-01
The Study focused on design and development of solid carbide step drill K34 to drill holes on composite materials such as Carbon Fiber Reinforced Plastic (CFRP) and Glass Fiber Reinforced Plastic (GFRP). The step drill K34 replaces step wise drilling of diameter 6.5mm and 9 mm holes that reduces the setup time, cutting speed, feed rate cost, delamination and increase the production rate. Several researchers have analyzed the effect of drilling process on various fiber reinforced plastic composites by carrying out using conventional tools and machinery. However, this process operation can lead to different kind of damages such as delamination, fiber pullout, and local cracks. To avoid the problems encountered at the time of drilling, suitable tool material and geometry is essential. This paper deals with the design and development of K34 Carbide step drill used to drill holes on CFRP and GFRP laminates. An Experimental study carried out to investigate the tool geometry, feed rate and cutting speed that avoids delamination and fiber breakage.
Oil exploration and development in Marib/Al Jawf basin, Yemen Arab Republic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maycock, I.D.
1988-02-01
In 1981, Yemen Hunt Oil Company (YHOC) negotiated a production-sharing agreement covering 12,600 km/sup 2/ in the northeast part of the Yemen Arab Republic. A reconnaissance seismic program of 1864 km acquired in 1982 revealed the presence of a major half graben, designated the Marib/Al Jawf basin by YHOC. A sedimentary section up to 18,000 ft thick has been recognized. Geologic field mapping identified Jurassic carbonates covered by Cretaceous sands overlying Permian glaciolacustrine sediments, Paleozoic sandstones, or Precambrian basement. The first well, Alif-1, drilled in 1984, aimed at a possible Jurassic carbonate objective, encountered hydrocarbon-bearing sands in the Jurassic-Cretaceous transitionmore » between 5000 and 6000 ft. Appraisal and development drilling followed. The Alif field is believed to contain in excess of 400 million bbl of recoverable oil. Subsequent wildcat drilling has located additional accumulations while further amplifying basin stratigraphy. Rapid basin development took place in the Late Jurassic culminating with the deposition of Tithonian salt. The evaporites provide an excellent seal for hydrocarbons apparently sourced from restricted basin shales and trapped in rapidly deposited clastics.« less
Antiwhirl PDC bits increased penetration rates in Alberta drilling. [Polycrystalline Diamond Compact
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bobrosky, D.; Osmak, G.
1993-07-05
The antiwhirl PDC bits and an inhibitive mud system contributed to the quicker drilling of the time-sensitive shales. The hole washouts in the intermediate section were dramatically reduced, resulting in better intermediate casing cement jobs. Also, the use of antirotation PDC-drillable cementing plugs eliminated the need to drill out plugs and float equipment with a steel tooth bit and then trip for the PDC bit. By using an antiwhirl PDC bit, at least one trip was eliminated in the intermediate section. Offset data indicated that two to six conventional bits would have been required to drill the intermediate hole interval.more » The PDC bit was rebuildable and therefore rerunnable even after being used on five wells. In each instance, the cost of replacing chipped cutters was less than the cost of a new insert roller cone bit. The paper describes the antiwhirl bits; the development of the bits; and their application in a clastic sequence, a carbonate sequence, and the Shekilie oil field; the improvement in the rate of penetration; the selection of bottom hole assemblies; washout problems; and drill-out characteristics.« less
Normann, R.A.; Kadlec, E.R.
1994-11-08
A downhole telemetry system is described for optically communicating to the surface operating parameters of a drill bit during ongoing drilling operations. The downhole telemetry system includes sensors mounted with a drill bit for monitoring at least one operating parameter of the drill bit and generating a signal representative thereof. The downhole telemetry system includes means for transforming and optically communicating the signal to the surface as well as means at the surface for producing a visual display of the optically communicated operating parameters of the drill bit. 7 figs.
Normann, Randy A.; Kadlec, Emil R.
1994-01-01
A downhole telemetry system is described for optically communicating to the surface operating parameters of a drill bit during ongoing drilling operations. The downhole telemetry system includes sensors mounted with a drill bit for monitoring at least one operating parameter of the drill bit and generating a signal representative thereof. The downhole telemetry system includes means for transforming and optically communicating the signal to the surface as well as means at the surface for producing a visual display of the optically communicated operating parameters of the drill bit.
Jagwani, Devaanshi; Kulkarni, Atul; Shukla, Parth; Ramteke, Dilip S; Juneja, Harjeet D
2011-11-01
As a consequence of offshore drilling, used Water Based Drilling Muds (WBMs) are typically disposed off, by discharging into the sea; such a disposal does not fully eliminate the environmental hazards. Hence, in this study, 2, 3, 4 and 5 ringed polycyclic aromatic hydrocarbons (PAHs i.e. naphthalene, fluorene, phenanthrene, fluoranthene, chrysene and benzo (a) pyrene) were determined from the WBMs and associated drill cuttings obtained from varying depths(viz. 150, 300 and 600 m) from three offshore wells present in East coast of India. In both WBMs and drill cuttings, concentration of naphthalene was maximum i.e. 81.59 ± 2.73 and 39.87 ± 2.40 mg/kg respectively, while benzo (a) pyrene was minimum i.e. 0.19 ± 0.07 and 0.12 ± 0.03 mg/kg respectively. The WBMs contained significantly (p < 0.05) higher PAH concentration than drill cuttings. The individual PAH concentration significantly (p < 0.01) increased with increasing depth in each well.
Tait, R D; Maxon, C L; Parr, T D; Newton, F C
2016-09-15
The effects of linear alpha olefin (LAO) nonaqueous drilling fluid on benthic macrofauna were assessed over a six year period at a southern Caspian Sea petroleum exploration site. A wide-ranging, pre-drilling survey identified a relatively diverse shelf-depth macrofauna numerically dominated by amphipods, cumaceans, and gastropods that transitioned to a less diverse assemblage dominated by hypoxia-tolerant annelid worms and motile ostracods with increasing depth. After drilling, a similar transition in macrofauna assemblage was observed with increasing concentration of LAO proximate to the shelf-depth well site. Post-drilling results were consistent with a hypothesis of hypoxia from microbial degradation of LAO, supported by the presence of bacterial mats and lack of oxygen penetration in surface sediment. Chemical and biological recoveries at ≥200m distance from the well site were evident 33months after drilling ceased. Our findings show the importance of monitoring recovery over time and understanding macrofauna community structure prior to drilling. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, W.N.
1979-12-04
A process for cementing a string of pipe in the permafrost region of a borehole of a well wherein aqueous drilling fluid actually used in drilling the wellbore in the permafrost region of a wellbore is employed. The drilling fluid contains or is adjusted to contain from about 2 to about 16 volume percent solids. Mixing with the drilling fluid (1) an additive selected from the group consisting of lignosulfonate, lignite, tannin, and mixtures thereof, (2) sufficient base to raise the pH of the drilling fluid into the range of from about 9 to about 12, and (3) cementitious materialmore » which will harden in from about 30 to about 40 hours at 40/sup 0/F. The resulting mixture is pumped into the permafrost region of a wellbore to be cemented and allowed to harden in the wellbore. There is also provided a process for treating an aqueous drilling fluid after it has been used in drilling the wellbore in permafrost, and a cementitious composition fro cementing in a permafrost region of a wellbore.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, W.N.
1980-01-01
A process for cementing a string of pipe in the permafrost region of a borehole of a well wherein aqueous drilling fluid actually used in drilling the wellbore in the permafrost region of a wellbore is employed. The drilling fluid contains or is adjusted to contain from about 2 to about 16 volume percent solids. Mixing with the drilling fluid (1) an additive selected from the group consisting of ligno-sulfonate, lignite, tannin, and mixtures thereof, (2) sufficient base to raise the pH of the drilling fluid into the range of from about 9 to about 12, and (3) cementitious materialmore » which will harden in from about 30 to about 40 hours at 40/sup 0/F. The resulting mixture is pumped into the permafrost region of a wellbore to be cemented and allowed to harden in the wellbore. There is also provided a process for treating an aqueous drilling fluid after it has been used in drilling the wellbore in permafrost, and a cementitious composition for cementing in a permafrost region of a wellbore.« less
Description and results of test-drilling program at Picatinny Arsenal, New Jersey, 1982-84
Harte, P.T.; Sargent, B.P.; Vowinkel, E.F.
1986-01-01
Picatinny Arsenal, located in north-central New Jersey, has a long history of explosives manufacturing. Past industrial activities and past waste-disposal practices have caused some groundwater contamination problems. In 1982, the U.S. Geological Survey, in cooperation with the U.S. Army, began a water resources investigation of the Arsenal. The test drilling program is designed to define the hydrogeology and install observation wells. Twenty-two boreholes were drilled and 21 observation wells installed in these holes. All drilling was done in a glaciated valley. The report includes lithologic and gamma-ray logs, results of grain-size analyses, well-construction data, and some groundwater levels. The generalized stratigraphic sequence of geologic units penetrated from the test-drilling program are from lower to upper: (1) pre-dominantly dolomitic Leithsville Formation, (2) in the upper part of bedrock, a weathered dolomite zone, (3) a thin discontinuous mantle of till, and (4) stratified drift deposit up to 208 ft thick. (USGS)
Residential noise from nearby oil and gas well construction and drilling.
Blair, Benjamin D; Brindley, Stephen; Dinkeloo, Eero; McKenzie, Lisa M; Adgate, John L
2018-05-11
Public concern about oil and gas (O&G) operations in residential areas is substantial. Noise from construction and drilling related to O&G operations may be greater than other phases of O&G operations; yet the impacts of audible and low-frequency noise during these operations are not extensively explored nor the effects on health well understood. This study documents the noise levels at a multi-well O&G well pad during construction and drilling in a residential area in Colorado. A-weighted (dBA) and C-weighted (dBC) noise measurements were collected at four locations during development over a 3-month period. The maximum 1-min equivalent continuous sound levels over a 1-month period were 60.2 dBA and 80.0 dBC. Overall, 41.1% of daytime and 23.6% of nighttime dBA 1-min equivalent continuous noise measurements were found to exceed 50 dBA, and 97.5% of daytime and 98.3% of nighttime measurements were found to exceed 60 dBC. Noise levels exceeding 50 dBA or 60 dBC may cause annoyance and be detrimental to health; thus, these noise levels have the potential to impact health and noise levels and associated health effects warrant further investigation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... a result of drilling a phase 2 or phase 3 ultra-deep well? 203.30 Section 203.30 Mineral Resources... for royalty relief as a result of drilling a phase 2 or phase 3 ultra-deep well? Your lease may... longitude in water depths entirely less than 400 meters deep. (b) The lease has not produced gas or oil from...
Code of Federal Regulations, 2014 CFR
2014-07-01
... a result of drilling a phase 2 or phase 3 ultra-deep well? 203.30 Section 203.30 Mineral Resources... for royalty relief as a result of drilling a phase 2 or phase 3 ultra-deep well? Your lease may... longitude in water depths entirely less than 400 meters deep. (b) The lease has not produced gas or oil from...
Code of Federal Regulations, 2012 CFR
2012-07-01
... a result of drilling a phase 2 or phase 3 ultra-deep well? 203.30 Section 203.30 Mineral Resources... for royalty relief as a result of drilling a phase 2 or phase 3 ultra-deep well? Your lease may... longitude in water depths entirely less than 400 meters deep. (b) The lease has not produced gas or oil from...
43 CFR 3105.3 - Operating, drilling or development contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Operating, drilling or development...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL AND GAS LEASING Cooperative Conservation Provisions § 3105.3 Operating, drilling or development contracts. ...
43 CFR 3105.3 - Operating, drilling or development contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Operating, drilling or development...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL AND GAS LEASING Cooperative Conservation Provisions § 3105.3 Operating, drilling or development contracts. ...
43 CFR 3105.3 - Operating, drilling or development contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Operating, drilling or development...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL AND GAS LEASING Cooperative Conservation Provisions § 3105.3 Operating, drilling or development contracts. ...
43 CFR 3105.3 - Operating, drilling or development contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Operating, drilling or development...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL AND GAS LEASING Cooperative Conservation Provisions § 3105.3 Operating, drilling or development contracts. ...
NASA Astrophysics Data System (ADS)
Amirov, Elnur
2016-04-01
A new technology to acquire wireline quality pressure tests using a Logging While Drilling approach has been successfully implemented few years ago in Azeri, Chirag and Guneshli wells which were drilled in the Khazarian-Caspian Sea of the Azerbaijan Republic. The Formation Tester While Drilling tool (GeoTap) uses a testing sequence similar to wireline tools. A single probe is extended to the borehole wall and a small pretest volume withdrawn from the formation. The resulting pressure transient is then analyzed for formation pressure, formation permeability and mobility information. Up-link and down-link capabilities have been added to achieve test control and quality feedback. An efficient downlink algorithm is used downhole to analyze the data. The parameters and pressure data are transmitted to the surface in real-time for continuous monitoring of the test. More detailed pressure data is recorded and retrieved after returning to surface. Use of a quartz gauge allows excellent accuracy. Azeri, Chirag and Guneshli fields consist of layered sand reservoirs alternation with shale sequences and detailed pressure data is acquired on a high percentage of wells in order to understand lateral and vertical continuity of different flow units. The formation tester can be utilized with the 'triple combo' Logging While Drilling string which eliminates the need to rig up wireline on many wells. Wireline formation tester runs are time consuming - particularly if high deviation or high overbalance conditions are encountered requiring pipe conveyed techniques. Non-Productive Time is high when the wireline tools are stuck and fishing operations are required. The Sperry Drilling GeoTap formation pressure tester service provides real-time formation pressure measurements. It bridges the critical gap between drilling safety and optimization, by providing early and reliable measurements of key reservoir properties, while improving reservoir understanding and completion design in real time. The GeoTap tester obtains direct pore-pressure measurements as the well is being drilled, with accuracy and precision comparable to that of wireline testers. The GeoTap service can eliminate the time, risk, and cost associated with running pipe-conveyed wireline test tools. It also measures annular and bore pressure while drilling, providing accurate, continuous, real-time hydrostatic pressure, and equivalent circulating density (ECD) information. This aids in determining and maintaining optimal mud weight, reduces formation damage, increases the rate of penetration, and increases operational safety. GeoTap benefits can be improvement of formation evaluation, real-time fluid gradients and fluid mobility (permeability/viscosity indicator), identification of fluid contact points, determination of reservoir connectivity/compartmentalization and depletion, increase safety of operation, determination of optimal mud weight and manage of ECD. We can also continuously monitor wellbore stability for assessments in order to reduce formation damage which in turns will help to increase drilling effectiveness (determine precise overbalance for maximizing ROP and continuously monitor hole-cleaning effectiveness with pressure-while-drilling, while reducing formation damage due to swab/surge). Save time and money by reducing rig down time associated with wireline testing. GeoTap Tool capable of performing more than 150 pressure tests per run and optional orientation of pressure measurement is available (top, right, bottom or left). GeoTap testing has been completed with encouraging results in many wells up to circa 3000m deep. Data has been acquired successfully both in a "Drill-Test-Drill' mode and a "Post-Drill-Test" mode. GeoTap tests have spanned wide ranges of borehole temperature, pressure, mobility as well as formation permeability and overbalance conditions. GeoTap tests in Azeri, Chirag and Guneshli wells which were drilled in the Khazarian-Caspian Sea of the Azerbaijan Republic have proved that a logging while drilling approach can be successfully employed to acquire formation pressure data in open hole (which is also very useful for fluid gradient analysis, oil water and gas oil contacts delineation/identification).
NASA Technical Reports Server (NTRS)
Badescu, Mircea
2014-01-01
Subsurface penetration by coring, drilling or abrading is of great importance for a large number of space and earth applications. An Ultrasonic/Sonic Drill/Corer (USDC) has been in development at JPL's Nondestructive Evaluation and Advanced Actuators (NDEAA) lab as an adaptable tool for many of these applications. The USDC uses a novel drive mechanism to transform the high frequency ultrasonic or sonic vibrations of the tip of a horn into a lower frequency sonic hammering of a drill bit through an intermediate free-flying mass. The USDC device idea has been implemented at various scales from handheld drills to large diameter coring devices. A series of computer programs that model the function and performance of the USDC device were developed and were later integrated into an automated modeling package. The USDC has also evolved from a purely hammering drill to a rotary hammer drill as the design requirements increased form small diameter shallow drilling to large diameter deep coring. A synthesis of the Auto-Gopher development is presented in this paper.
Analysis of pressure buildups taken from fluid level data -Tyler Sands, Central Montana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bishop, D.F.
Pressure buildups taken by fluid level recording prove to be quite usable for formation evaluation in the ''Tyler'' sands of Central Montana. This method provides low cost information with surprising accuracy. The procedures followed in obtaining the data, and the precautions taken in assuring the validity of the data are discussed in the paper. The data proved sufficiently accurate to perform engineering calculations in two separate ''Tyler'' fields. The calculations aided in determination of reservoir parameters, and in one field provided justification for additional development drilling. In another field, the data substantiated the limited reservoir, and development drilling plans weremore » cancelled. The buildup curves illustrated well bore damage in some of the wells and subsequent stimulation of two wells resulted in sustained six-fold and nine-fold increases in producing rates of these wells. This paper illustrates the value of the engineering calculations when applied to carefully gathered field data. The method should have application in other areas with similar producing properties to the ''Tyler'' sands in Central Montana.« less
Non-technical skills: enhancing safety in operating theatres (and drilling rigs).
Flin, Rhona
2014-03-01
On April 20th 2010, a large Transocean drilling rig called the Deepwater Horizon was operating in the Gulf of Mexico to drill the Macondo well, for the oil company BP. The job was six weeks behind schedule and $58 million over budget and had not been without difficulty: it was a high pressure well, 2.5 miles below the seabed. At 5.45 am, the Halliburton cementing engineer sent an email to say: 'We have completed the job and it went well'. At 9.43 pm, 16 hours later, there was a release of hydrocarbons into the well bore and the drilling rig experienced a catastrophic blowout as the high pressure oil and gas escaped onto the rig and into the ocean. The resulting explosions and fire killed 11 of the crew of 126, injured many more and created an enormous oil spill across the Gulf.
Comments on some of the drilling and completion problems in Cerro Prieto geothermal wells
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dominguez A, B.; Sanchez G, G.
From 1960 to the present, 85 wells with a total drilling length exceeding 160,000 m have been constructed at Cerro Prieto, a modest figure compared to an oil field. This activity took place in five stages, each characterized by changes and modifications required by various drilling and well-completion problems. Initially, the technical procedures followed were similar to those used in the oil industry. However, several problems emerged as a result of the relatively high temperatures found in the geothermal reservoir. The various problems that have been encountered can be considered to be related to drilling fluids, cements and cementing operations,more » lithology, geothermal fluid characteristics, and casings and their accessories. As the importance of high temperatures and the characteristics of the geothermal reservoir fluids were better understood, the criteria were modified to optimize well-completion operations, and satisfactory results have been achieved to date.« less
Auto-Gopher-II: an autonomous wireline rotary-hammer ultrasonic drill
NASA Astrophysics Data System (ADS)
Badescu, Mircea; Lee, Hyeong Jae; Sherrit, Stewart; Bao, Xiaoqi; Bar-Cohen, Yoseph; Jackson, Shannon; Chesin, Jacob; Zacny, Kris; Paulsen, Gale L.; Mellerowicz, Bolek; Kim, Daniel
2017-04-01
Developing technologies that would enable future NASA exploration missions to penetrate deeper into the subsurface of planetary bodies for sample collection is of great importance. Performing these tasks while using minimal mass/volume systems and with low energy consumption is another set of requirements imposed on such technologies. A deep drill, called Auto-Gopher II, is currently being developed as a joint effort between JPL's NDEAA laboratory and Honeybee Robotics Corp. The Auto-Gopher II is a wireline rotary-hammer drill that combines formation breaking by hammering using an ultrasonic actuator and cuttings removal by rotating a fluted auger bit. The hammering mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) mechanism that has been developed as an adaptable tool for many drilling and coring applications. The USDC uses an intermediate free-flying mass to transform high frequency vibrations of a piezoelectric transducer horn tip into sonic hammering of the drill bit. The USDC concept was used in a previous task to develop an Ultrasonic/Sonic Ice Gopher and then integrated into a rotary hammer device to develop the Auto-Gopher-I. The lessons learned from these developments are being integrated into the development of the Auto- Gopher-II, an autonomous deep wireline drill with integrated cuttings and sample management and drive electronics. Subsystems of the wireline drill are being developed in parallel at JPL and Honeybee Robotics Ltd. This paper presents the development efforts of the piezoelectric actuator, cuttings removal and retention flutes and drive electronics.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2004-10-01
The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for a next level of deep drilling performance; Phase 2--Develop advanced smart bit-fluid prototypes and test at large scale; and Phase 3--Field trial smart bit-fluid concepts, modify as necessary and commercialize products. As of report date, TerraTek has concluded all major preparations for themore » high pressure drilling campaign. Baker Hughes encountered difficulties in providing additional pumping capacity before TerraTek's scheduled relocation to another facility, thus the program was delayed further to accommodate the full testing program.« less
Records of wells drilled for oil and gas in Montana, June 1, 1951 through December 31, 1953
Smith, Howard R.
1955-01-01
Data concerning about 1, 800 dry holes and selected producing wells drilled in Montana from June 1, 1951, through December 31, 1953, are contained in this circular, which supplements Circular 172 published in 1952. Also included is a table listing the oil and gas fields of Montana. WELLS DRILLED FOR OIL AND GAS IN MONTANA FROM JUNE 1, 1951, THOROUGH DECEMBER 31, 1953 This circular contains data on dry holes and selected producing wells drilled in Montana from June 1, 1951, through December 31, 1953, and supplements Circular 172 published in 1952 showing records of wells drilled prior to June 1, 1951. Table 1 lists the oil and gas fields of Montana (see map OM 130). The list of wells in table 2 has been compiled from information in Geological Survey files and includes most if not all the unsuccessful wildcat test wells and unsuccessful field extension wells drilled from June 1, 1951 to December 31, 1953. It also includes some older but successful field extension wells that had not been listed in Circular 172. Data are tabulated under location, county, field or geologic structure, operator, lease, and well number, elevation, geologic formation (at the surface and lowest formation reached), production or shows of oil or gas, total depth, and status and date. The wells are tabulated by township, range, quarter, and section in the order of townships north-ranges west, townships north-ranges east, townships south-ranges east, and townships south-ranges west. The names entered under 'Field or geologic structure' are those of the productive area or the geologic structure on or near which the wells have been drilled. Ground elevations have been given for wells for which the records indicated the reference point of the elevation. The surface formation and lowest formation reached in the wells are indicated by symbols which are identified on the accompanying explanation of formation symbols (fig. 1). Not all of the nomenclature is in accord with current Geological Survey usage. In the column 'Production or shows of oil and gas' the symbol GS is used for gas shows, OS for oil shows, GOS for shows of both gas and oil, GP for gas production, and OP for oil production. A number following the symbol for a show or production indicates the depth to the top of the zone in which the gas or oil was found. The letter symbol following the number or the hyphen indicates the geologic formation in which the gas or oil occurs. The status and depth of each well is indicated. The letters A, C, and D preceding the date indicate abandoned, completed, or drilling, respectively, in the specified year. Most if not all producing wells that have been abandoned are shown as completed wells. The date of abandonment is the year in which drilling ceased, except for a few wells in which the abandonment was preceded by one or more years of suspended operations. The diagrammatic representation of the succession of geologic formations in Montana (fig. 1) provides identification of the letter symbols used in the tabulation to indicate geologic formations.
Amirov, Z R
2005-01-01
To protect health and to warn future workers against the choice of a petroleum job that was not in accord with their psychological and physiological features of their organism, studies (such as sanitary and psychophysiological ones) were conducted to create criteria for the professional selection of drilling technicians who provided the sinking of oil wells. The studies have been systematized and mathematically analyzed. This made it possible to reveal the significant psychophysiological properties (8 parameters) in a drilling technician. By taking into account these properties, the author derived a linear equation that estimates the fitness of a candidate for a job as a drilling technician.