  1. 76 FR 9608 - Certain Welded Large Diameter Line Pipe From Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... Large Diameter Line Pipe From Mexico AGENCY: United States International Trade Commission. ACTION... duty order on certain welded large diameter line pipe from Mexico. For further information concerning... welded large diameter line pipe from Mexico would not be likely to lead to continuation or recurrence of...

  2. 77 FR 30260 - Welded Large Diameter Line Pipe From Japan: Notice of Rescission of Antidumping Duty...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... Administration [A-588-857] Welded Large Diameter Line Pipe From Japan: Notice of Rescission of Antidumping Duty... Japan. The review covers five producers/exporters of welded large diameter line pipe from Japan, which... diameter line pipe from Japan for the period December 1, 2010, through November 30, 2011. See Antidumping...

  3. 78 FR 12784 - Welded Large Diameter Line Pipe From Japan; Scheduling of a Full Five-Year Review Concerning the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... Diameter Line Pipe From Japan; Scheduling of a Full Five-Year Review Concerning the Antidumping Duty Order on Welded Large Diameter Line Pipe From Japan AGENCY: United States International Trade Commission... revocation of the antidumping duty order on welded large diameter line pipe from Japan would be likely to...

  4. 78 FR 60897 - Certain Welded Large Diameter Line Pipe From Japan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... Diameter Line Pipe From Japan Determination On the basis of the record \\1\\ developed in the subject five... order on certain welded large diameter line pipe from Japan would likely to lead to continuation or... Line Pipe from Japan: Investigation No. 731-TA-919 (Second Review). By order of the Commission. Issued...

  5. 75 FR 38989 - Welded Large Diameter Line Pipe From Japan: Notice of Rescission of Antidumping Duty...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... Pipe From Japan: Notice of Rescission of Antidumping Duty Administrative Review AGENCY: Import... antidumping duty order on welded large diameter line pipe from Japan. The review covers 4 producers/exporters of welded large diameter line pipe from Japan, which are, JFE Steel Corporation, Nippon Steel...

  6. 78 FR 41369 - Certain Small Diameter Carbon and Alloy Seamless Standard, Line and Pressure Pipe From Romania...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... Carbon and Alloy Seamless Standard, Line and Pressure Pipe From Romania: Preliminary Results of..., line and pressure pipe (small diameter seamless pipe) from Romania. The period of review (POR) is... and Alloy Seamless Standard, Line and Pressure Pipe from Romania,'' dated concurrently with this...

  7. 78 FR 10134 - Welded Large Diameter Line Pipe From Japan: Final Results of the Expedited Second Sunset Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... Pipe From Japan: Final Results of the Expedited Second Sunset Review of the Antidumping Duty Order... antidumping duty order on welded large diameter line pipe (line pipe) from Japan pursuant to section 751(c) of... Department initiated the sunset review of the antidumping duty order on line pipe from Japan pursuant to...

  8. 77 FR 59374 - Certain Small Diameter Carbon and Alloy Seamless Standard, Line and Pressure Pipe (Under 41/2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... DEPARTMENT OF COMMERCE International Trade Administration [A-588-851] Certain Small Diameter Carbon and Alloy Seamless Standard, Line and Pressure Pipe (Under 4\\1/2\\ Inches) From Japan: Rescission... antidumping order on certain small diameter carbon and alloy seamless standard, line and pressure pipe (under...

  9. 78 FR 41366 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 4 1/2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 4 \\1/2\\ Inches) From Japan: Preliminary... seamless standard, line, and pressure pipe (over 4 \\1/2\\ inches) (large diameter seamless pipe) from Japan.../exporters of subject merchandise, Canadian Natural Resources Limited (CNRL), JFE Steel Corporation (JFE...

  10. 75 FR 18153 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Japan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Japan: Extension of Time Limit for... review of the antidumping duty order on certain large diameter carbon and alloy seamless standard, line... Carbon and Alloy Seamless Standard, Line and Pressure Pipe from Japan: Extension of Time Limit for...

  11. SMALL DIAMETER CEMENT LINING FROM STAIRWAY. United States Pipe ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SMALL DIAMETER CEMENT LINING FROM STAIRWAY. - United States Pipe & Foundry Company Plant, Coating, Painting, Lining & Packaging Building, 2023 St. Louis Avenue at I-20/59, Bessemer, Jefferson County, AL

  12. 77 FR 67336 - Certain Small Diameter Carbon and Alloy Seamless Standard, Line and Pressure Pipe From Romania...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... products subject to the order are small diameter seamless carbon and alloy (other than stainless) steel... Carbon and Alloy Seamless Standard, Line and Pressure Pipe From Romania: Final Results of Antidumping... alloy seamless standard, line and pressure pipe from Romania. The period of review is August 1, 2010...

  13. 77 FR 27428 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 41/2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ... diameter seamless pipe is used primarily for line applications such as oil, gas, or water pipeline, or utility distribution systems. Seamless pressure pipes are intended for the conveyance of water, steam... (``ASME'') code stress levels. Alloy pipes made to ASTM A-335 standard must be used if temperatures and...

  14. 76 FR 66688 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 41/2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ... diameter seamless pipe is used primarily for line applications such as oil, gas, or water pipeline, or utility distribution systems. Seamless pressure pipes are intended for the conveyance of water, steam... (``ASME'') code stress levels. Alloy pipes made to ASTM A-335 standard must be used if temperatures and...

  15. 76 FR 47555 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line and Pressure Pipe From Japan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... diameter seamless pipe is used primarily for line applications such as oil, gas, or water pipeline, or utility distribution systems. Seamless pressure pipes are intended for the conveyance of water, steam... Engineers (``ASME'') code stress levels. Alloy pipes made to ASTM A-335 standard must be used if...

  16. 77 FR 21734 - Certain Small Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Romania...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Romania: Extension of Time Limit for... diameter carbon and alloy seamless standard, line and pressure pipe from Romania for the period August 1... investigation based upon the allegation of the petitioner, U.S. Steel. See the memorandum to Susan Kuhbach dated...

  17. 75 FR 11119 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Japan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Japan: Extension of Time Limit for... review of the antidumping duty order on certain large diameter carbon and alloy seamless standard, line... manufacturers/exporters: JFE Steel Corporation; Nippon Steel Corporation; NKK Tubes; and Sumitomo Metal...

  18. 76 FR 7815 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 41/2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... DEPARTMENT OF COMMERCE International Trade Administration [A-588-850] Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 4\\1/2\\ Inches) From Japan: Extension of... administrative review of the antidumping duty order on certain large diameter carbon and alloy seamless standard...

  19. Electrical Transmission Line Diametrical Retention Mechanism

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2006-01-03

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

  20. 4 Metre diameter penstock construction for the Raymond Reservoir Hydro Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, H.D.; Alexander, M.

    1995-12-31

    A four metre diameter 770 m long buried steel penstock was constructed for the 20 MW Raymond Reservoir Hydro Project in southern Alberta. The penstock delivers up to 56.7 m{sup 3}/sec of irrigation water at an effective head of 44 m to a 2.6 m diameter Kaplan turbine. The hydro facility was commissioned in the spring of 1994. The steel pipe was delivered to the site in 18 m long sections from a fabrication plant located 250 km away. Specialized equipment was engineered and constructed to externally coat and internally line the pipe sections on site. The pipe sections, weighingmore » from 27,000 to 30,000 kg, were rolled and moved on a specially built lathe during the external sandblasting and tape wrapping operation. The external tape wrapping is one element of the cathodic protection system for the steel pipe. Specialized equipment was modified to sandblast the interior to white metal and then mechanically apply three coats of internal epoxy lining. The internal lining improves the hydraulic characteristics of the pipe in addition to protecting the pipe from corrosion. This innovative approach to coating and lining the pipe resulted in an exceptionally high quality product at an affordable cost.« less

  1. SMALL DIAMETER PRECEMENT LINING FROM CATWALK ABOVE. United States ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SMALL DIAMETER PRE-CEMENT LINING FROM CATWALK ABOVE. - United States Pipe & Foundry Company Plant, Coating, Painting, Lining & Packaging Building, 2023 St. Louis Avenue at I-20/59, Bessemer, Jefferson County, AL

  2. 76 FR 62762 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line and Pressure Pipe From Japan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... line applications such as oil, gas, or water pipeline, or utility distribution systems. Seamless pressure pipes are intended for the conveyance of water, steam, petrochemicals, chemicals, oil products... Fahrenheit, at various American Society of Mechanical Engineers (``ASME'') code stress levels. Alloy pipes...

  3. Northern view of inside diameter welding station of the saw ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Northern view of inside diameter welding station of the saw line in bay9 of the main pipe mill building. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  4. Welding needs specified for X-80 offshore line pipe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Price, J.C.

    1993-12-20

    High-quality, defect-free welds can be deposited in API Grade 5L X-80 line pipe with pulsed gas-metal-arc welding (GMAW) and shielded metal-arc welding (SMAW) processes. The newly developed Grade X-80 combines higher yield-strength pipe with thinner walls to reduce fabrication costs and improve some projects' economics. Use of X-80 pipe can yield as much as 7.5% cost savings over construction with X-65 steel. Increased demand of natural gas has prompted development of large gas fields which will require large-diameter pipelines at higher operating pressures. API 5L X-80 line pipe could, therefore, become commonplace by the end of the decade if weldingmore » technology can be developed to match mechanical properties without affecting productivity. The paper discusses large-diameter projects, welding processes, GMAW shielding gas, SMAW filler wires, hardness and weldability, toughness and corrosion resistance, economics, and what's been learned.« less

  5. 77 FR 50465 - Certain Small Diameter Carbon and Alloy Seamless Standard, Line and Pressure Pipe From Romania...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ...- 795, and the American Petroleum Institute (API) 5L specifications and meeting the physical parameters... standard, line, or pressure pipe applications and meeting the physical parameters described below.... The scope of this review includes all seamless pipe meeting the physical parameters described above...

  6. General view of outside diameter welding stations of the saw ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General view of outside diameter welding stations of the saw line in bay 8 of the main pipe mill building looking northwest. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  7. 78 FR 64475 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 41/2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... line applications such as oil, gas, or water pipeline, or utility distribution systems. Seamless pressure pipes are intended for the conveyance of water, steam, petrochemicals, chemicals, oil products... stress levels. Alloy pipes made to ASTM A-335 standard must be used if temperatures and stress levels...

  8. Friction Stir Welding of Line-Pipe Steels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanderson, Samuel; Mahoney, Murray; Feng, Zhili

    Friction stir welding (FSW) offers both economic and technical advantages over conventional fusion welding practices for welding line-pipe. For offshore line-pipe construction, the economic savings has been shown to be considerable, approaching a calculated 25%. Offshore pipe is relatively small diameter but heavy wall compared to onshore pipe. One concern is the ability to achieve consistent full weld penetration in an on-site offshore FSW operation, e.g., on a lay-barge. In addition, depending on the size and morphology of the unwelded zone, lack of penetration at the weld root can be difficult if not impossible to detect by conventional NDE methods.more » Thus, an approach to assure consistent full penetration via process control is required for offshore line-pipe construction using FSW. For offshore construction, an internal structural mandrel can be used offering the opportunity to use a sacrificial anvil FSW approach. With this approach, a small volume of sacrificial material can be inserted into the structural anvil. The FSW tool penetrates into the sacrificial anvil, beyond the inner diameter of the pipe wall, thus assuring full penetration. The sacrificial material is subsequently removed from the pipe inner wall. In the work presented herein, FSW studies were completed on both 6 mm and 12 mm wall thickness line-pipe. Lastly, post-FSW evaluations including radiography, root-bend tests, and metallography demonstrated the merits of the sacrificial anvil approach to achieve consistent full penetration.« less

  9. Non-intrusive ultrasonic liquid-in-line detector for small diameter tubes

    DOEpatents

    Piper, Thomas C.

    1982-01-01

    An arrangement for deleting liquid in a line, using non-intrusive ultrasonic techniques is disclosed. In this arrangement, four piezoelectric crystals are arranged in pairs about a 0.072 inch o.d. pipe. An ultrasonic tone burst is transmitted along the pipe, between crystal pairs, and the amplitude of the received tone burst indicates the absence/presence of liquid in the pipe.

  10. Non-intrusive ultrasonic liquid-in-line detector for small diameter tubes. [Patent application

    DOEpatents

    Piper, T.C.

    1980-09-24

    An arrangement for detecting liquids in a line, using non-intrusive ultrasonic techniques is disclosed. In this arrangement, four piezoelectric crystals are arranged in pairs about a 0.078 inch o.d. pipe. An ultrasonic tone burst is transmitted along the pipe, between crystal pairs, and the amplitude of the received tone burst indicates the absence/presence of liquid in the pipe.

  11. 77 FR 46385 - Certain Small Diameter Seamless Carbon and Alloy Standard, Line, and Pressure Pipe From Germany...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ...: Seamless pressure pipes are intended for the conveyance of water, steam, petrochemicals, chemicals, oil... Mechanical Engineers (ASME) code stress levels. Alloy pipes made to ASTM standard A-335 must be used if temperatures and stress levels exceed those allowed for A-106 and the ASME codes. Seamless pressure pipes sold...

  12. Synchronous scan-projection lithography on overall circumference of fine pipes with a diameter of 2 mm

    NASA Astrophysics Data System (ADS)

    Horiuchi, Toshiyuki; Furuhata, Takahiro; Muro, Hideyuki

    2016-06-01

    The scan-projection exposure of small-diameter pipe surfaces was investigated using a newly developed prototype exposure system. It is necessary to secure a very large depth of focus for printing thick resist patterns on round pipe surfaces with a roughness larger than that of semiconductor wafers. For this reason, a camera lens with a low numerical aperture of 0.089 was used as a projection lens, and the momentary exposure area was limited by a narrow slit with a width of 800 µm. Thus, patterns on a flat reticle were replicated on a pipe surface by linearly moving the reticle and rotating the pipe synchronously. By using a reticle with inclined line-and-space patterns, helical patterns with a width of 30 µm were successfully replicated on stainless-steel pipes with an outer diameter of 2 mm and coated with a 10-µm-thick negative resist. The patterns replicated at the start and stop edges were smoothly stitched seamlessly.

  13. Lower San Fernando corrugated metal pipe failure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bardet, J.P.; Davis, C.A.

    1995-12-31

    During the January 17, 1994, Northridge earthquake, a 2.4 m diameter corrugated metal pipe was subjected to 90 m of extensive lateral crushing failure at the Lower San Fernando Dam. The dam and outlet works were reconstructed after the 1971 San Fernando Earthquake. In 1994, the dam underwent liquefaction upstream of the reconstructed berm. The pipe collapsed on the west side of the liquefied zone and a large sinkhole formed over the drain line. The failure of this drain line provides a unique opportunity to study the seismic response of buried drains and culverts.

  14. Cesium Absorption Spectrum Perturbed by Argon: Observation of Non-Lorentzian Wing Properties

    DTIC Science & Technology

    2012-03-01

    vapor phase Cs contained in a heat pipe in order to observe the absorption lines. Two lenses were used to collimate the light through the heat pipe...After passing through the heat pipe, a mirror was used to direct light around a 90 degree turn and then through an f/# matched lens into a monochromator...pipe used here was built by Charles Fox as part of [19]. Brewster’s angle windows were attached to either end of a pipe approximately 1 inch in diameter

  15. Numerical and experimental investigation of strip deformation in cage roll forming process for pipes with low ratio of thickness/diameter

    NASA Astrophysics Data System (ADS)

    Kasaei, M. M.; Naeini, H. Moslemi; Tehrani, M. Salmani; Tafti, R. Azizi

    2011-01-01

    Cage roll forming is one of the advanced methods of cold roll forming process which is used widely for producing ERW pipes. In addition to decreasing the production cost and time, using cage roll forming provides smooth deformation on the strip. Few studies can be found about cage roll forming because of its complexity, and the available knowledge is experience-based more than science-based. In this paper, deformation of pipes with low ratio of thickness/diameter is investigated by 3D finite element simulation in Marc-Mentat software. Edge buckling defect in cage roll forming of low ratio of thickness/diameter pipes is very important. Due to direct influence of longitudinal strain on the edge buckling phenomenon, longitudinal strains at the edge and center line of the strip are investigated and high risk stands are introduced. The deformed strip is predicted using the simulation results and effects of each cage forming stage on the deformed strip profile are specified. In order to verify the simulation results, strip width and opening distance of the two edges in different forming stages are obtained from the simulations and compared with the experimental data which were measured from the production line. A good agreement between the experimental and simulated results is observed.

  16. Procedure for detecting underground utilities with specific shape

    NASA Astrophysics Data System (ADS)

    Ristic, Aleksandar; Vrtunski, Milan; Govedarica, Miro; Bugarinovic, Zeljko

    2016-04-01

    Nowadays GPR technology is acknowledged as a reliable, fast, non-destructive remote sensing technology whose area of applications is wider every day. One of its most common applications is underground utility detection. Not only it is possible to detect the utility in the field, but using certain algorithms utilities which haven't been detected in the field can be detected in radargrams. There is a number of procedures for automated detection of utility in the radargrams. Further, there are procedures that can estimate certain parameters such as propagation velocity, diameter or even characteristics of the material. However, the majority of these procedures is designed to detect cylindrical shape utilities, which, in a radargram, are represented with hyperbolic reflection. According to geometry of hyperbola, utility parameters can be estimated. In this paper we present a procedure that is designed to estimate characteristics of non-cylindrical utilities. It is worth mentioning that these utilities are not so rare. Some underground tanks and sewage collectors are among them. Heat line is consisted of two insulated pipes of the same diameter, often placed in a concrete channel and covered with plates made from reinforced concrete. Therefore, it can be considered as non-cylindrical utility and such structure has characteristic signature in a radargram. The main idea of the proposed procedure is to detect this signature, and then, based on standardized parameters for the heat lines, to estimate the diameter of the pipes. The proposed procedure is based on artificial neural network. As a training set we made a number of radargrams collected on different locations which contain heat lines of various dimensions. Pipe diameters were in a range from 65 to 250 mm. 400MHz antenna was used since the depth hasn't exceeded 2m. After the network is trained it is validated using radargrams that haven't been used in the training set. Further tests were done with radargrams that contained none, one or several heat lines. Experiments showed that it is possible to automatically detect heating lines in a radargram and later, based on detection results, to estimate the diameter of the pipes using standard heat line dimensions. This paper is a contribution to the 2016 EGU GA Session GI3.1 "Civil Engineering Applications of Ground Penetrating Radar," organized by the COST Action TU1208

  17. 77 FR 13079 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 41/2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... such as oil, gas, or water pipeline, or utility distribution systems. Seamless pressure pipes are intended for the conveyance of water, steam, petrochemicals, chemicals, oil products, natural gas and other... high temperature service. They are intended for the low temperature and pressure conveyance of water...

  18. 78 FR 64477 - Welded Large Diameter Line Pipe From Japan: Continuation of Antidumping Duty Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Pipe From Japan: Continuation of Antidumping Duty Order AGENCY: Enforcement and Compliance, Formerly...) from Japan would likely lead to continuation or recurrence of dumping and material injury to an... Department published the antidumping duty order on LDLP from Japan.\\1\\ On October 1, 2012, the Department...

  19. 75 FR 14243 - Pipeline Safety: Girth Weld Quality Issues Due to Improper Transitioning, Misalignment, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No..., and Welding Practices of Large Diameter Line Pipe AGENCY: Pipeline and Hazardous Materials Safety... bulletin to notify owners and operators of recently constructed large diameter natural gas pipeline and...

  20. 77 FR 56809 - Certain Small Diameter Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... conveyance of water, steam, petrochemicals, chemicals, oil products, natural gas and other liquids and gasses... stress levels. Alloy pipes made to ASTM standard A-335 must be used if temperatures and stress levels... for the low temperature and pressure conveyance of water, steam, natural gas, air and other liquids...

  1. Norman Wells oil line to be wintertime projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, D.

    Mobilization is underway for the first construction season on $1.3 billion (Canadian) Norman Wells oil pipeline between Norman Wells, N.W. Terr., and Zama, Alta. The 537-mile, 12-in. crude oil line is being built by Interprovincial Pipe Line Co., Ltd. Because of ground conditions in the Mackenzie River delta, where the pipeline will be installed, work must be done while the ground is frozen--essentially a 90-day period from Jan. through early April. Pipe for the line, all 12-in. nominal diameter, has wall thickness varying from 9.39 to 9.53 mm and is grade 5LX-52 with special notch toughness for Arctic use, achievedmore » with additives to the steel plus special refined rolling techniques. The pipe is coated with extruded polyethylene and then shipped by truck and railcar.« less

  2. Non-Newtonian Liquid Flow through Small Diameter Piping Components: CFD Analysis

    NASA Astrophysics Data System (ADS)

    Bandyopadhyay, Tarun Kanti; Das, Sudip Kumar

    2016-10-01

    Computational Fluid Dynamics (CFD) analysis have been carried out to evaluate the frictional pressure drop across the horizontal pipeline and different piping components, like elbows, orifices, gate and globe valves for non-Newtonian liquid through 0.0127 m pipe line. The mesh generation is done using GAMBIT 6.3 and FLUENT 6.3 is used for CFD analysis. The CFD results are verified with our earlier published experimental data. The CFD results show the very good agreement with the experimental values.

  3. High temperature lined conduits, elbows and tees

    DOEpatents

    De Feo, Angelo; Drewniany, Edward

    1982-01-01

    A high temperature lined conduit comprising, a liner, a flexible insulating refractory blanket around and in contact with the liner, a pipe member around the blanket and spaced therefrom, and castable rigid refractory material between the pipe member and the blanket. Anchors are connected to the inside diameter of the pipe and extend into the castable material. The liner includes male and female slip joint ends for permitting thermal expansion of the liner with respect to the castable material and the pipe member. Elbows and tees of the lined conduit comprise an elbow liner wrapped with insulating refractory blanket material around which is disposed a spaced elbow pipe member with castable refractory material between the blanket material and the elbow pipe member. A reinforcing band is connected to the elbow liner at an intermediate location thereon from which extend a plurality of hollow tubes or pins which extend into the castable material to anchor the lined elbow and permit thermal expansion. A method of fabricating the high temperature lined conduit, elbows and tees is also disclosed which utilizes a polyethylene layer over the refractory blanket after it has been compressed to maintain the refractory blanket in a compressed condition until the castable material is in place. Hot gases are then directed through the interior of the liner for evaporating the polyethylene and setting the castable material which permits the compressed blanket to come into close contact with the castable material.

  4. 78 FR 63164 - Certain Small Diameter Carbon and Alloy Seamless Standard, Line and Pressure Pipe From Romania...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... American Society for Testing and Materials (ASTM) A- 53, ASTM A-106, ASTM A-333, ASTM A-334, ASTM A-335, ASTM A-589, ASTM A- 795, and the American Petroleum Institute (API) 5L specifications and meeting the... to the application of external heat. Seamless carbon steel pressure pipe meeting the ASTM A- 106...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, Y.J.; Sohn, G.H.; Kim, Y.J.

    Typical LBB (Leak-Before-Break) analysis is performed for the highest stress location for each different type of material in the high energy pipe line. In most cases, the highest stress occurs at the nozzle and pipe interface location at the terminal end. The standard finite element analysis approach to calculate J-Integral values at the crack tip utilizes symmetry conditions when modeling near the nozzle as well as away from the nozzle region to minimize the model size and simplify the calculation of J-integral values at the crack tip. A factor of two is typically applied to the J-integral value to accountmore » for symmetric conditions. This simplified analysis can lead to conservative results especially for small diameter pipes where the asymmetry of the nozzle-pipe interface is ignored. The stiffness of the residual piping system and non-symmetries of geometry along with different material for the nozzle, safe end and pipe are usually omitted in current LBB methodology. In this paper, the effects of non-symmetries due to geometry and material at the pipe-nozzle interface are presented. Various LBB analyses are performed for a small diameter piping system to evaluate the effect a nozzle has on the J-integral calculation, crack opening area and crack stability. In addition, material differences between the nozzle and pipe are evaluated. Comparison is made between a pipe model and a nozzle-pipe interface model, and a LBB PED (Piping Evaluation Diagram) curve is developed to summarize the results for use by piping designers.« less

  6. Detection of underground water distribution piping system and leakages using ground penetrating radar (GPR)

    NASA Astrophysics Data System (ADS)

    Amran, Tengku Sarah Tengku; Ismail, Mohamad Pauzi; Ahmad, Mohamad Ridzuan; Amin, Mohamad Syafiq Mohd; Sani, Suhairy; Masenwat, Noor Azreen; Ismail, Mohd Azmi; Hamid, Shu-Hazri Abdul

    2017-01-01

    A water pipe is any pipe or tubes designed to transport and deliver water or treated drinking with appropriate quality, quantity and pressure to consumers. The varieties include large diameter main pipes, which supply entire towns, smaller branch lines that supply a street or group of buildings or small diameter pipes located within individual buildings. This distribution system (underground) is used to describe collectively the facilities used to supply water from its source to the point of usage. Therefore, a leaking in the underground water distribution piping system increases the likelihood of safe water leaving the source or treatment facility becoming contaminated before reaching the consumer. Most importantly, leaking can result in wastage of water which is precious natural resources. Furthermore, they create substantial damage to the transportation system and structure within urban and suburban environments. This paper presents a study on the possibility of using ground penetrating radar (GPR) with frequency of 1GHz to detect pipes and leakages in underground water distribution piping system. Series of laboratory experiment was designed to investigate the capability and efficiency of GPR in detecting underground pipes (metal and PVC) and water leakages. The data was divided into two parts: 1. detecting/locating underground water pipe, 2. detecting leakage of underground water pipe. Despite its simplicity, the attained data is proved to generate a satisfactory result indicating GPR is capable and efficient, in which it is able to detect the underground pipe and presence of leak of the underground pipe.

  7. Pipeline design and thermal stress analysis of a 10kW@20K helium refrigerator

    NASA Astrophysics Data System (ADS)

    Xu, D.; Gong, L. H.; Xu, P.; Liu, H. M.; Li, L. F.; Xu, X. D.

    2014-01-01

    This paper is based on the devices and pipeline in the horizontal cryogenic cold-box of a 10kW@20K helium refrigerator developed by Technical Institute of Physics and Chemistry, Chinese Academy of Sciences. Four devices, six valves, supporting components and pipe lines are positioned in the cold-box. At operating state, the temperature of these devices and pipeline is far below the room temperature, and the lowest temperature is 14K. Due to different material and temperature, the shrinkage of devices and pipes is different. Finite element analysis software SOLIDWORKS SIMULATION was used to numerically simulate the thermal stress and deformation. The results show that the thermal stress of pipe A is a little large. So we should change the pipe route or use a bellows expansion joint. Bellows expansion joints should also be used in the pipes connected to three of the six valves to protect them by decreasing the deformation. At last, the effect of diameter, thickness and bend radius on the thermal stress was analyzed. The results show that the thermal stress of the pipes increases with the increase of the diameter and the decrease of the bend radius.

  8. Impact of vent pipe diameter on characteristics of waste degradation in semi-aerobic bioreactor landfill.

    PubMed

    Jiang, Guobin; Liu, Dan; Chen, Weiming; Ye, Zhicheng; Liu, Hong; Li, Qibin

    2017-10-01

    The evolution mechanism of a vent pipe diameter on a waste-stabilization process in semi-aerobic bioreactor landfills was analyzed from the organic-matter concentration, biodegradability, spectral characteristics of dissolved organic matter, correlations and principal-component analysis. Waste samples were collected at different distances from the vent pipe and from different landfill layers in semi-aerobic bioreactor landfills with different vent pipe diameters. An increase in vent pipe diameter favored waste degradation. Waste degradation in landfills can be promoted slightly when the vent pipe diameter increases from 25 to 50 mm. It could be promoted significantly when the vent pipe diameter was increased to 75 mm. The vent pipe diameter is important in waste degradation in the middle layer of landfills. The dissolved organic matter in the waste is composed mainly of long-wave humus (humin), short-wave humus (fulvic acid) and tryptophan. The humification levels of the waste that was located at the center of vent pipes with 25-, 50- and 75-mm diameters were 2.2682, 4.0520 and 7.6419 Raman units, respectively. The appropriate vent pipe diameter for semi-aerobic bioreactor landfills with an 800-mm diameter was 75 mm. The effect of different vent pipe diameters on the degree of waste stabilization is reflected by two main components. Component 1 is related mainly to the content of fulvic acid, biologically degradable material and organic matter. Component 2 is related mainly to the content of tryptophan and humin from the higher vascular plants.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hooker, J.N.

    This report describes an investigation of energy consumption and efficiency of oil pipelines in the US in 1978. It is based on a simulation of the actual movement of oil on a very detailed representation of the pipeline network, and it uses engineering equations to calculate the energy that pipeline pumps must have exerted on the oil to move it in this manner. The efficiencies of pumps and drivers are estimated so as to arrive at the amount of energy consumed at pumping stations. The throughput in each pipeline segment is estimated by distributing each pipeline company's reported oil movementsmore » over its segments in proportions predicted by regression equations that show typical throughput and throughput capacity as functions of pipe diameter. The form of the equations is justified by a generalized cost-engineering study of pipelining, and their parameters are estimated using new techniques developed for the purpose. A simplified model of flow scheduling is chosen on the basis of actual energy use data obtained from a few companies. The study yields energy consumption and intensiveness estimates for crude oil trunk lines, crude oil gathering lines and oil products lines, for the nation as well as by state and by pipe diameter. It characterizes the efficiency of typical pipelines of various diameters operating at capacity. Ancillary results include estimates of oil movements by state and by diameter and approximate pipeline capacity utilization nationwide.« less

  10. Repairing pipes on the fly

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    When piping develops leaks, the natural instinct is to shut the process down, purge the lines and call in maintenance crews to make the repairs. There is, however, an alternative: on-the-fly repairs. Through the use of specialized tools, equipment and technicians, shut-off valves can be installed and leaks repaired without interrupting production. The split sleeve offers one of the simpler approaches to on-the-fly repairs. Two half cylinders with inside diameter slightly larger than the outside diameter slightly larger than the outside diameter of the pipe to be repaired are slipped over the latter some distance form the leak and looselymore » bolted together. The cylinder is then slid over the leaking area and the bolts tightened. Gaskets inside the half cylinders provide the needed seal between the pipe and the cylinder. Installing a shut-off valve in an operating pipeline requires much more specialized equipment and skills than does repairing a leak with a split sleeve. A device available from International Piping Services Co. allows a trained crew to isolate a section of pipe, drill out the isolated portion, install a blocking valve and then remove the isolation system--all while continuing to operate the pipeline at temperatures to 700 F and pressures to 700 psi. But Herb Porter, CEO of Ipsco, cautions that unlike the repairing leaks with a split sleeve, installing a blocking valve on-the-fly always demands the services of a highly trained crew.« less

  11. Pipe support for use in a nuclear system

    DOEpatents

    Pollono, Louis P.; Mello, Raymond M.

    1977-01-01

    A pipe support for high temperature, thin-walled vertical piping runs used in a nuclear system. A cylindrical pipe transition member, having the same inside diameter as the thin-walled piping, replaces a portion of the piping where support is desired. The outside diameter of the pipe transition member varies axially along its vertical dimension. For a section of the axial length adjacent the upper and lower terminations of the pipe transition member, the outside diameter is the same as the outside diameter of the thin-walled piping to which it is affixed. Intermediate of the termination sections, the outside diameter increases from the top of the member to the bottom. Adjacent the lower termination section, the diameter abruptly becomes the same as the piping. Thus, the cylindrical transition member is formed to have a generally triangular shaped cross-section along the axial dimension. Load-bearing insulation is installed next to the periphery of the member and is kept in place by an outer ring clamp. The outer ring clamp is connected to pipe hangers, which provide the desired support for the vertical thin-walled piping runs.

  12. On the impact bending test technique for high-strength pipe steels

    NASA Astrophysics Data System (ADS)

    Arsenkin, A. M.; Odesskii, P. D.; Shabalov, I. P.; Likhachev, M. V.

    2015-10-01

    It is shown that the impact toughness (KCV-40 = 250 J/cm2) accepted for pipe steels of strength class K65 (σy ≥ 550 MPa) intended for large-diameter gas line pipes is ineffective to classify steels in fracture strength. The results obtained upon testing of specimens with a fatigue crack and additional sharp lateral grooves seem to be more effective. In energy consumption, a macrorelief with splits is found to be intermediate between ductile fracture and crystalline brittle fracture. A split formation mechanism is considered and a scheme is proposed for split formation.

  13. Technology Demonstration: Acoustic Condition Assessment of Wastewater Collection Systems

    EPA Science Inventory

    The overall objective of this EPA-funded study was to demonstrate innovative sewer line assessment technologies that are designed for rapid deployment using portable equipment. This study focused on demonstration of technologies that are suitable for smaller diameter pipes (less ...

  14. Demonstration of Innovative Sewer System Inspection Technology: SL-RAT

    EPA Science Inventory

    The overall objective of this EPA-funded study was to demonstrate innovative sewer line assessment technologies that are designed for rapid deployment using portable equipment. This study focused on demonstration of technologies that are suitable for smaller diameter pipes (less ...

  15. 77 FR 26539 - El Paso Natural Gas Company; Supplemental Notice of Intent To Prepare an Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ...-diameter lateral pipeline to connect the Douglas Meter Station to EPNG's existing Line No. 2164; Replacement of compressor modules and station yard piping at the existing Willcox Compressor Station; [[Page 26540

  16. Fabrication of cylindrical micro-parts using synchronous rotary scan-projection lithography and chemical etching

    NASA Astrophysics Data System (ADS)

    Ito, Kaiki; Suzuki, Yuta; Horiuchi, Toshiyuki

    2017-07-01

    Lithographical patterning on the surface of a fine pipe with a thin wall is required for fabricating three-dimensional micro-parts. For this reason, a new exposure system for printing patterns on a cylindrical pipe by synchronous rotary scan-projection exposure was developed. Using the exposure system, stent-like resist patterns with a width of 251 μm were printed on a surface of stainless-steel pipe with an outer diameter of 2 mm. The exposure time was 30 s. Next, the patterned pipe was chemically etched. As a result, a stent-like mesh pipe with a line width of 230 μm was fabricated. It was demonstrated that the new method had a potential to be applied to fabrications of stent and other cylindrical micro-parts.

  17. Demonstration of Innovative Sewer System Inspection Technology SewerBatt

    EPA Science Inventory

    The overall objective of this EPA-funded study was to demonstrate innovative a sewer line assessment technology that is designed for rapid deployment using portable equipment. This study focused on demonstration of a technology that is suitable for smaller diameter pipes (less th...

  18. U.S. EPA Technology Demonstration: Acoustic Condition Assessment of Wastewater Collection Systems

    EPA Science Inventory

    The overall objective of this EPA-funded study was to demonstrate innovative sewer line assessment technologies that are designed for rapid deployment using portable equipment. This study focused on demonstration of technologies that are suitable for smaller diameter pipes (less ...

  19. CHARACTERIZATION OF FLOW-RESISTANT TUBES USED FOR SEMI-OCCLUDED VOCAL TRACT VOICE TRAINING AND THERAPY

    PubMed Central

    Smith, Simeon L.; Titze, Ingo R.

    2016-01-01

    Objectives To characterize the pressure-flow relationship of tubes used for semi-occluded vocal tract voice training/therapy, as well as to answer these major questions: (1) What is the relative importance of tube length to tube diameter? (2) What is the range of oral pressures achieved with tubes at phonation flow rates? (3) Does mouth configuration behind the tubes matter? Methods Plastic tubes of various diameters and lengths were mounted in line with an upstream pipe, and the pressure drop across each tube was measured at stepwise increments in flow rate. Basic flow theory and modified flow theory equations were used to describe the pressure-flow relationship of the tubes based on diameter and length. Additionally, the upstream pipe diameter was varied to explore how mouth shape affects tube resistance. Results The modified equation provided an excellent prediction of the pressure-flow relationship across all tube sizes (6% error compared to the experimental data). Variation in upstream pipe diameter yielded up to 10% deviation in pressure for tube sizes typically used in voice training/therapy. Conclusions Using the presented equations, resistance can be characterized for any tube based on diameter, length, and flow rate. With regard to the original questions, we found that: (1) For commonly used tubes, diameter is the critical variable for governing flow resistance; (2) For phonation flow rates, a range of tube dimensions produced pressures between 0 and 7.0 kPa; (3) The mouth pressure behind the lips will vary slightly with different mouth shapes, but this effect can be considered relatively insignificant. PMID:27133001

  20. Leak detectability of the Norman Wells pipeline by mass balance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liou, J.C.P.

    Pipeline leak detection using software-based systems is becoming common practice. The detectability of such systems is measured by how small and how quickly a leak can be detected. Algorithms used and measurement uncertainties determine leak detectability. This paper addresses leak detectability using mass balance, establishes leak detectability for Norman Wells pipelines, and compares it with field leak test results. The pipeline is operated by the Interprovincial Pipe Line (IPL) Inc., of Edmonton, Canada. It is a 12.75-inch outside diameter steel pipe with variable wall thickness. The length of the pipe is approximately 550 miles (868.9 km). The pipeline transports lightmore » crude oil at a constant flow rate of about 250 m{sup 3}/hr. The crude oil can enter the pipeline at two locations. Besides the Norman Wells inlet, there is a side line near Zama terminal that can inject crude oil into the pipeline.« less

  1. Investigation of transient chill down phenomena in tubes using liquid nitrogen

    NASA Astrophysics Data System (ADS)

    Shukla, A. K.; Sridharan, Arunkumar; Atrey, M. D.

    2017-12-01

    Chill down of cryogenic transfer lines is a crucial part of cryogenic propulsion as chill down ensures transfer of single phase fluid to the storage tanks of cryogenic engines. It also ensures single phase liquid flow at the start of the engine. Chill down time depends on several parameters such as length of the pipe, pipe diameter, orientation, mass flux etc. To understand the effect of these parameters, experiments are carried out in a set up designed and fabricated at Indian Institute of Technology Bombay using tubes of two different diameters. Experiments are conducted at different inlet pressures and mass flow rate values to understand their effect. Two different pipe sizes are taken to study the effect of variation in diameter on chill down time and quantity of cryogen required. Different orientations are taken to understand their effect on the chill down time, heat transfer coefficient and critical heat flux for the same inlet pressure and mass flux. Pipe inner wall temperature, heat transfer coefficient for different boiling regimes and critical heat flux are calculated based on measured outer surface temperature history for each case. A one dimensional energy conservation equation is solved for transient chill down process considering constant mass flux and inlet pressure to predict the chill down time. Temperature variation during chill down obtained from the numerical simulations are compared with the measured temperature history.

  2. Shock wave absorber having a deformable liner

    DOEpatents

    Youngdahl, C.K.; Wiedermann, A.H.; Shin, Y.W.; Kot, C.A.; Ockert, C.E.

    1983-08-26

    This invention discloses a shock wave absorber for a piping system carrying liquid. The absorber has a plastically deformable liner defining the normal flow boundary for an axial segment of the piping system, and a nondeformable housing is spaced outwardly from the liner so as to define a gas-tight space therebetween. The flow capacity of the liner generally corresponds to the flow capacity of the piping system line, but the liner has a noncircular cross section and extends axially of the piping system line a distance between one and twenty times the diameter thereof. Gas pressurizes the gas-tight space equal to the normal liquid pressure in the piping system. The liner has sufficient structural capacity to withstand between one and one-half and two times this normal liquid pressures; but at greater pressures it begins to plastically deform initially with respect to shape to a more circular cross section, and then with respect to material extension by circumferentially stretching the wall of the liner. A high energy shock wave passing through the liner thus plastically deforms the liner radially into the gas space and progressively also as needed in the axial direction of the shock wave to minimize transmission of the shock wave beyond the absorber.

  3. Prediction of corrosion rates of water distribution pipelines according to aggressive corrosive water in Korea.

    PubMed

    Chung, W S; Yu, M J; Lee, H D

    2004-01-01

    The drinking water network serving Korea has been used for almost 100 years. Therefore, pipelines have suffered various degrees of deterioration due to aggressive environments. The pipe breaks were caused by in-external corrosion, water hammer, surface loading, etc. In this paper, we focused on describing corrosion status in water distribution pipes in Korea and reviewing some methods to predict corrosion rates. Results indicate that corrosive water of lakes was more aggressive than river water and the winter was more aggressive compared to other seasons. The roughness growth rates of Dongbok lake showed 0.23 mm/year. The high variation of corrosion rates is controlled by the aging pipes and smaller diameter. Also the phenolphthalein test on a cementitious core of cement mortar lined ductile cast iron pipe indicated the pipes over 15 years old had lost 50-100% of their lime active cross sectional area.

  4. Liquefied Natural Gas Transfer

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Chicago Bridge & Iron Company's tanks and associated piping are parts of system for transferring liquefied natural gas from ship to shore and storing it. LNG is a "cryogenic" fluid meaning that it must be contained and transferred at very low temperatures, about 260 degrees below Fahrenheit. Before the LNG can be pumped from the ship to the storage tanks, the two foot diameter transfer pipes must be cooled in order to avoid difficulties associated with sharp differences of temperature between the supercold fluid and relatively warm pipes. Cooldown is accomplished by sending small steady flow of the cryogenic substance through the pipeline; the rate of flow must be precisely controlled or the transfer line will be subjected to undesirable thermal stress.

  5. DSTO Landmine Detection Test Targets

    DTIC Science & Technology

    2005-06-01

    cm diameter, 10 cm high. x x GS 32D50 Galvanised steel, pipe, hollow, 32 cm diameter, 50 cm long, ends capped x x GS 45D50 Galvanised Steel, pipe...hollow, 45 cm diameter, 50 cm long, ends capped x x GS 75D50 Galvanised Steel, pipe, hollow, 75 cm diameter, 50 cm long, ends capped x x

  6. Construction integrity assessment report (ETN-98-0005) S-Farm overground transfer (OGT) system valve pit 241-S-B to valve pit 241-S-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HICKS, D.F.

    1999-08-12

    The S-Farm overground transfer (OGT) line will bypass the existing line(s), between valve pits 241-S-B and 241-S-D that no longer meet system requirements. The new OGT line will provide a waste transfer pipeline between these valve pits in support of saltwell pumping activities. The length of the OGT line is approximately 180 ft from pit to pit. The primary pipe is nominal 1-in. diameter stainless steel (SST) braided Ethylene-propylene Diene Monomer (EPDM) hose. The encasement pipe is a nominal 3-in., flanged, SST pipe made up of several different length pipe spool pieces (drawing H-2-829564, sh. 1 and sh. 2). Themore » OGT line slopes from valve pit 241-S-B toward valve pit 241-S-D. At each end, the primary and encasement pipe connect to a pit entry spool piece. The pit entry spool pieces are constructed of prefabricated SST materials. These spool pieces allow for the separation of the primary and encasement pipelines after the pipes have entered the valve pits (drawing H-2-818280, sh. 2). The pit entry spool pieces also allow for leak detection of the encasement pipe at each end (drawing H-2-829564, sh. 2). The OGT encasement pipeline is supported above ground by adjustable height unistrut brackets and precast concrete bases (drawing H-2-829654, sh. 1). The pipeline is heat-traced and insulated. The heat tracing and insulation supply and retain latent heat that prevents waste solidification during transfers and provides freeze protection. The total length of the pipeline is above ground, thereby negating the need for cathodic corrosion protection. This Construction Integrity Assessment Report (CIAR) is prepared by Fluor Daniel Northwest for Numatec Hanford Corporation/Lockheed Martin Hanford Corporation, the operations contractor, and the U. S. Department of Energy, the system owner. The CIAR is intended to verify that construction was performed in accordance with the provisions of Washington Administrative Code, WAC-173-303-640 (3) (c), (e), (f) and (h).« less

  7. 75 FR 38781 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Japan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    .../exporters: JFE Steel Corporation (``JFE Steel''); Nippon Steel Corporation; NKK Tubes; and Sumitomo Metal..., United States Steel Corporation (``U.S. Steel''), a domestic producer of the subject merchandise, made a timely request that the Department conduct an administrative review of JFE Steel, Nippon Steel...

  8. Sensitivity study of the monogroove with screen heat pipe design

    NASA Technical Reports Server (NTRS)

    Evans, Austin L.; Joyce, Martin

    1988-01-01

    The present sensitivity study of design variable effects on the performance of a monogroove-with-screen heat pipe obtains performance curves for maximum heat-transfer rates vs. operating temperatures by means of a computer code; performance projections for both 1-g and zero-g conditions are obtainable. The variables in question were liquid and vapor channel design, wall groove design, and the number of feed lines in the evaporator and condenser. The effect on performance of three different working fluids, namely ammonia, methanol, and water, were also determined. Greatest sensitivity was to changes in liquid and vapor channel diameters.

  9. 78 FR 36179 - Carlsbad Municipal Water District; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... conditions, and prescriptions. k. Deadline for filing responsive documents: Due to the small size of the... proposed 80-foot-long, 16-inch-diameter intake pipe; (3) a proposed 18- foot by 18-foot powerhouse..., 50-foot discharge pipe, connecting to existing 42-inch diameter and 10- inch diameter pipes conveying...

  10. 76 FR 76707 - El Paso Natural Gas Company: Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... long, 16-inch diameter lateral pipeline to connect the Douglas Meter Station to EPNG's existing Line No. 2164; The replacement of compressor modules and station yard piping at the existing Willcox Compressor Station; Expansion of the existing Douglas Meter Station by installing updated flow control and pressure...

  11. 77 FR 59973 - Certain Welded Large Diameter Line Pipe From Japan; Institution of a Five-Year Review Concerning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... and demand conditions or business cycle for the Domestic Like Product that have occurred in the United... Official, at 202-205-3088. Limited disclosure of business proprietary information (BPI) under an... business association, or another interested party (including an explanation). If you are a union/worker...

  12. A thin gold coated hydrogen heat pipe-cryogenic target for external experiments at COSY

    NASA Astrophysics Data System (ADS)

    Abdel-Bary, M.; Abdel-Samad, S.; Elawadi, G. A.; Kilian, K.; Ritman, J.

    2009-05-01

    A gravity assisted Gold coated heat pipe (GCHP) with 5-mm diameter has been developed and tested to cool a liquid hydrogen target for external beam experiments at COSY. The need for a narrow target diameter leads us to study the effect of reducing the heat pipe diameter to 5 mm instead of 7 mm, to study the effect of coating the external surface of the heat pipe by a shiny gold layer (to decrease the radiation heat load), and to study the effect of using the heat pipe without using 20 layers of' super-insulation around it (aluminized Mylar foil) to keep the target diameter as small as possible. The developed gold coated heat pipe was tested with 20 layers of super-insulation (WI) and without super-insulation (WOI). The operating characteristics for both conditions were compared to show the advantages and disadvantages.

  13. Failure Analysis of PRDS Pipe in a Thermal Power Plant Boiler

    NASA Astrophysics Data System (ADS)

    Ghosh, Debashis; Ray, Subrata; Mandal, Jiten; Mandal, Nilrudra; Shukla, Awdhesh Kumar

    2018-04-01

    The pressure reducer desuperheater (PRDS) pipeline is used for reducing the pressure and desuperheating of the steam in different auxiliary pipeline. When the PRDS pipeline is failed, the reliability of the boiler is affected. This paper investigates the probable cause/causes of failure of the PRDS tapping line. In that context, visual inspection, outside diameter and wall thickness measurement, chemical analysis, metallographic examination and hardness measurement are conducted as part of the investigative studies. Apart from these tests, mechanical testing and fractographic analysis are also conducted as supplements. Finally, it has been concluded that the PRDS pipeline has mainly failed due to graphitization due to prolonged exposure of the pipe at higher temperature. The improper material used is mainly responsible for premature failure of the pipe.

  14. Manufacture of mold of polymeric composite water pipe reinforced charcoal

    NASA Astrophysics Data System (ADS)

    Zulfikar; Misdawati; Idris, M.; Nasution, F. K.; Harahap, U. N.; Simanjuntak, R. K.; Jufrizal; Pranoto, S.

    2018-03-01

    In general, household wastewater pipelines currently use thermoplastic pipes of Polyvinyl Chloride (PVC). This material is known to be not high heat resistant, contains hazardous chemicals (toxins), relatively inhospitable, and relatively more expensive. Therefore, researchers make innovations utilizing natural materials in the form of wood charcoal as the basic material of making the water pipe. Making this pipe requires a simple mold design that can be worked in the scale of household and intermediate industries. This research aims to produce water pipe mold with simple design, easy to do, and making time relatively short. Some considerations for molding materials are weight of mold, ease of raw material, strong, sturdy, and able to cast. Pipe molds are grouped into 4 (four) main parts, including: outer diameter pipe molding, pipe inside diameter, pipe holder, and pipe alignment control. Some materials have been tested as raw materials for outer diameter of pipes, such as wood, iron / steel, cement, and thermoset. The best results are obtained on thermoset material, where the process of disassembling is easier and the resulting mold weight is relatively lighter. For the inside diameter of the pipe is used stainless steel, because in addition to be resistant to chemical processes that occur, in this part of the mold must hold the press load due to shrinkage of raw materials of the pipe during the process of hardening (polymerization). Therefore, it needs high pressure resistant material and does not blend with the raw material of the pipe. The base of the mold is made of stainless steel material because it must be resistant to corrosion due to chemical processes. As for the adjustment of the pipe is made of ST 37 carbon steel, because its function is only as a regulator of the alignment of the pipe structure.

  15. Pipe crawler development for duct elbow removal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zollinger, W.T.; Treanor, R.C.

    1992-01-01

    This paper describes the development of equipment for removing an elbow in a 36 inch diameter ventilation line by cutting from the inside. Radiation levels, high air flow and physical constraints preclude any manual rework of the ventilation system. A remotely operated pipe crawler was developed. Testing has been performed in a full-scale mockup which models the ventilation duct configuration with the exception of radiation levels. The results gathered from the testing are discussed, and illustrate the strengths and weaknesses of the crawler and plasma arc torch system. To date, the equipment has successfully completed the tasks of maneuvering throughmore » the duct geometry, performing the two required cuts, and backing out of the duct mockup. The elbow successfully fell away from the main duct, showing that the line would be clear of obstructions.« less

  16. Pipe crawler development for duct elbow removal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zollinger, W.T.; Treanor, R.C.

    1992-11-01

    This paper describes the development of equipment for removing an elbow in a 36 inch diameter ventilation line by cutting from the inside. Radiation levels, high air flow and physical constraints preclude any manual rework of the ventilation system. A remotely operated pipe crawler was developed. Testing has been performed in a full-scale mockup which models the ventilation duct configuration with the exception of radiation levels. The results gathered from the testing are discussed, and illustrate the strengths and weaknesses of the crawler and plasma arc torch system. To date, the equipment has successfully completed the tasks of maneuvering throughmore » the duct geometry, performing the two required cuts, and backing out of the duct mockup. The elbow successfully fell away from the main duct, showing that the line would be clear of obstructions.« less

  17. 76 FR 39852 - Certain Large Diameter Carbon and Alloy Seamless Standard, Line, and Pressure Pipe (Over 41/2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... by refineries, petrochemical plants, and chemical plants, as well as in power generation plants and... it sell any subject merchandise to any trading company with the knowledge that the trading company... during the POR. In its response, JFE explained in detail how its claim of no knowledge is supported by...

  18. 75 FR 44224 - Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... orders on Certain Polyester Staple Fiber from the People's Republic of China (``PRC'') with respect to... Diameter Carbon and Alloy Seamless, 6/1/09-5/31/10 Standard, Line, and Pressure Pipe, A-588-850.... JFE... Republic of China: Certain Polyester Staple Fiber, \\3\\ A-570-905.... 6/1/09-5/31/10 Far Eastern Industries...

  19. 78 FR 3916 - Certain Welded Large Diameter Line Pipe From Japan; Notice of Commission Determination To Conduct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... application, consult the Commission's Rules of Practice and Procedure, part 201, subparts A through E (19 CFR part 201), and part 207, subparts A, D, E, and F (19 CFR part 207). DATES: Effective Date: January 4.... International Trade Commission, 500 E Street SW., Washington, DC 20436. Hearing-impaired persons can obtain...

  20. 78 FR 4843 - Hydro Development; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ...-foot-wide, 98-foot-deep concrete lined vertical shaft containing 10-foot-diameter siphon piping and a... via the Internet. See 18 CFR Sec. 385.2001(a)(1)(iii) and the instructions on the Commission's Web... Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket number (P-14360) in...

  1. Friction loss in straight pipes of unplasticized polyvinyl chloride.

    PubMed

    Iwasaki, T; Ojima, J

    1996-01-01

    In order to design proper ductwork for a local exhaust system, airflow characteristics were investigated in straight pipes of unplasticized polyvinyl chloride (PVC). A linear decrease in static pressure was observed downstream at points from the opening of the VU pipes (JIS K 6741) located at distances greater than 10 times the pipe diameter, for velocities ranging between 10.18-36.91 m/s. Roughness inside pipes with small diameters was found to be 0.0042-0.0056 mm and the friction factor was calculated on the basis of Colebrook's equation for an airflow transition zone. An extended friction chart was then constructed on the basis of the roughness value and the friction factor. This chart can be applied when designing a local exhaust system with the ducts of diameters ranging from 40 to 900 mm. The friction loss of the PVC pipe was found to be approximately 2/3 of that of a galvanized steel pipe.

  2. Applications of UT results to confirm defects findings by utilization of relevant metallurgical investigations techniques on gas/condensate pipeline working in wet sour gas environment

    NASA Astrophysics Data System (ADS)

    El-Azhari, O. A.; Gajam, S. Y.

    2015-03-01

    The gas/condensate pipe line under investigation is a 12 inch diameter, 48 km ASTM, A106 steel pipeline, carrying hydrocarbons containing wet CO2 and H2S.The pipe line had exploded in a region 100m distance from its terminal; after 24 years of service. Hydrogen induced cracking (HIC) and sour gas corrosion were expected due to the presence of wet H2S in the gas analysis. In other areas of pipe line ultrasonic testing was performed to determine whether the pipeline can be re-operated. The results have shown presence of internal planner defects, this was attributed to the existence of either laminations, type II inclusions or some service defects such as HIC and step wise cracking (SWC).Metallurgical investigations were conducted on fractured samples as per NACE standard (TM-0284-84). The obtained results had shown macroscopic cracks in the form of SWC, microstructure of steel had MnS inclusions. Crack sensitivity analyses were calculated and the microhardness testing was conducted. These results had confirmed that the line material was suffering from sour gas deteriorations. This paper correlates the field UT inspection findings with those methods investigated in the laboratory. Based on the results obtained a new HIC resistance material pipeline needs to be selected.

  3. Numerical study of the influence of geometrical characteristics of a vertical helical coil on a bubbly flow

    NASA Astrophysics Data System (ADS)

    Saffari, H.; Moosavi, R.

    2014-11-01

    In this article, turbulent single-phase and two-phase (air-water) bubbly fluid flows in a vertical helical coil are analyzed by using computational fluid dynamics (CFD). The effects of the pipe diameter, coil diameter, coil pitch, Reynolds number, and void fraction on the pressure loss, friction coefficient, and flow characteristics are investigated. The Eulerian-Eulerian model is used in this work to simulate the two-phase fluid flow. Three-dimensional governing equations of continuity, momentum, and energy are solved by using the finite volume method. The k- ɛ turbulence model is used to calculate turbulence fluctuations. The SIMPLE algorithm is employed to solve the velocity and pressure fields. Due to the effect of a secondary force in helical pipes, the friction coefficient is found to be higher in helical pipes than in straight pipes. The friction coefficient increases with an increase in the curvature, pipe diameter, and coil pitch and decreases with an increase in the coil diameter and void fraction. The close correlation between the numerical results obtained in this study and the numerical and empirical results of other researchers confirm the accuracy of the applied method. For void fractions up to 0.1, the numerical results indicate that the friction coefficient increases with increasing the pipe diameter and keeping the coil pitch and diameter constant and decreases with increasing the coil diameter. Finally, with an increase in the Reynolds number, the friction coefficient decreases, while the void fraction increases.

  4. Installation Restoration Program. Phase II. Confirmation/Quantification Stage 2 for Griffiss Air Force Base, New York.

    DTIC Science & Technology

    1985-02-20

    Surface Cemennt/entonte Grout Rat 20/1 6" Diameter Bore "Ole 8 Foit B.G.S. Bentorito 4" Diameter POes" Schedle 409 Fee S.O.S.PVC Riser Pipe with...Casing with Locking Cap GRiser Pipe StickupGround Surface 2.2Fe Cement/BSentonite Grout Ratio 20/1 8" Diameter Bore Hole cv Ile- 3 Feet B.G.S...Ground Surface 4’. Ground Surface .0~ Cemtert/Bentonlte Grout Rat 20/1 8" Diamneter Bore Hole__ 4" Diameter Pl O Schedule 404 PVC Riser Pipe FetBGS

  5. Persistence of asymmetry in nonaxisymmetric entry flow in a circular cylindrical tube and its relevance to arterial pulse wave diagnosis.

    PubMed

    Xue, H; Fung, Y C

    1989-02-01

    In an experiment motivated by the study of arterial blood flow along the lines suggested by the traditional Chinese medicine, the flow in a pipe whose lumen was blocked by a semi-circular plug two tube-diameters long was visualized by suspended particles, recorded by cinematography, and analyzed digitally. The Reynolds number was in the range of 100 to 450 based on the pipe diameter, similar to that of blood flow in the radial artery in the arms of man. The blockage was found to have a profound effect on the velocity profile of the flow in the wake, but it had little influence on the symmetry of the velocity profile upstream of the block, except in its immediate neighborhood. When the end conditions far away from the block were steady, the flow in the wake was steady. The asymmetry of the flow in the wake can be judged by the deviation of the location of the maximum axial velocity from the center line of the pipe as seen in the plane of symmetry of the blockage. Our results show that the deviation can be described as the sum of two components. The first is a strong one which decays exponentially in an entry length which is about twice as long as the classical Boussinesq entry length of axisymmetric flow. The second is a weaker component which is wavy spatially and persists far downstream (many times the entry length). The separated flow and vortex system behind the blockage are sensitive to the flow rate.(ABSTRACT TRUNCATED AT 250 WORDS)

  6. 77 FR 30522 - Sunoco Pipeline L.P., West Texas Gulf Pipe Line Company, Mobil Pipe Line Company; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-16-000] Sunoco Pipeline L.P., West Texas Gulf Pipe Line Company, Mobil Pipe Line Company; Notice of Petition for Declartaory... Company, and Mobil Pipe Line Company (collectively, Petitioners) filed a petition for a declaratory order...

  7. 49 CFR 393.124 - What are the rules for securing concrete pipe?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... place by blocks and/or wedges; and (iii) Every pipe in the bottom tier must also be held firmly in... not secured individually with a tiedown, then: (A) Either one 1/2-inch diameter chain or wire rope, or two 3/8-inch diameter chain or wire rope, must be placed longitudinally over the group of pipes; (B...

  8. 49 CFR 393.124 - What are the rules for securing concrete pipe?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... place by blocks and/or wedges; and (iii) Every pipe in the bottom tier must also be held firmly in... not secured individually with a tiedown, then: (A) Either one 1/2-inch diameter chain or wire rope, or two 3/8-inch diameter chain or wire rope, must be placed longitudinally over the group of pipes; (B...

  9. 49 CFR 393.124 - What are the rules for securing concrete pipe?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... place by blocks and/or wedges; and (iii) Every pipe in the bottom tier must also be held firmly in... not secured individually with a tiedown, then: (A) Either one 1/2-inch diameter chain or wire rope, or two 3/8-inch diameter chain or wire rope, must be placed longitudinally over the group of pipes; (B...

  10. 49 CFR 393.124 - What are the rules for securing concrete pipe?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... place by blocks and/or wedges; and (iii) Every pipe in the bottom tier must also be held firmly in... not secured individually with a tiedown, then: (A) Either one 1/2-inch diameter chain or wire rope, or two 3/8-inch diameter chain or wire rope, must be placed longitudinally over the group of pipes; (B...

  11. 49 CFR 393.124 - What are the rules for securing concrete pipe?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... place by blocks and/or wedges; and (iii) Every pipe in the bottom tier must also be held firmly in... not secured individually with a tiedown, then: (A) Either one 1/2-inch diameter chain or wire rope, or two 3/8-inch diameter chain or wire rope, must be placed longitudinally over the group of pipes; (B...

  12. Nuclear reactor heat transport system component low friction support system

    DOEpatents

    Wade, Elman E.

    1980-01-01

    A support column for a heavy component of a liquid metal fast breeder reactor heat transport system which will deflect when the pipes leading coolant to and from the heavy component expand or contract due to temperature changes includes a vertically disposed pipe, the pipe being connected to the heavy component by two longitudinally spaced cycloidal dovetail joints wherein the distal end of each of the dovetails constitutes a part of the surface of a large diameter cylinder and the centerlines of these large diameter cylinders intersect at right angles and the pipe being supported through two longitudinally spaced cycloidal dovetail joints wherein the distal end of each of the dovetails constitutes a part of the surface of a large diameter cylinder and the centerlines of these large diameter cylinders intersect at right angles, each of the cylindrical surfaces bearing on a flat and horizontal surface.

  13. Inclusion of tank configurations as a variable in the cost optimization of branched piped-water networks

    NASA Astrophysics Data System (ADS)

    Hooda, Nikhil; Damani, Om

    2017-06-01

    The classic problem of the capital cost optimization of branched piped networks consists of choosing pipe diameters for each pipe in the network from a discrete set of commercially available pipe diameters. Each pipe in the network can consist of multiple segments of differing diameters. Water networks also consist of intermediate tanks that act as buffers between incoming flow from the primary source and the outgoing flow to the demand nodes. The network from the primary source to the tanks is called the primary network, and the network from the tanks to the demand nodes is called the secondary network. During the design stage, the primary and secondary networks are optimized separately, with the tanks acting as demand nodes for the primary network. Typically the choice of tank locations, their elevations, and the set of demand nodes to be served by different tanks is manually made in an ad hoc fashion before any optimization is done. It is desirable therefore to include this tank configuration choice in the cost optimization process itself. In this work, we explain why the choice of tank configuration is important to the design of a network and describe an integer linear program model that integrates the tank configuration to the standard pipe diameter selection problem. In order to aid the designers of piped-water networks, the improved cost optimization formulation is incorporated into our existing network design system called JalTantra.

  14. Low-Carbon Metallurgical Concepts for Seamless Octg Pipe

    NASA Astrophysics Data System (ADS)

    Mohrbacher, Hardy

    Seamless pipes are available with wall gages of up to 100 mm and outer diameters up to around 700 mm. Such pipes are typically used for oil country tubular goods as well as for structural applications. Due to market requirements the demand for high strength grade seamless pipes is increasing. Many applications need high toughness in addition to high strength. The different rolling processes applied in production depend on wall gage and pipe diameter. The continuous mandrel mill process is used to produce smaller gages and diameters; plug mill processing covers medium gages and diameters; Pilger mill processing allows producing larger diameters and heavy wall gage. In all these processes only a limited degree of thermo-mechanical rolling can be achieved. Therefore strengthening and toughening by severe grain refinement employing a conventional niobium-based microalloying concept is not easily achievable. Accordingly, high strength and toughness seamless pipe is typically produced via a quench and tempering process route. This route however is costly and above that often constitutes a capacity bottleneck in the mill. Innovative low-carbon alloy concepts however do allow producing strength up to grade X70 at very high toughness directly off the rolling plant, i.e., without quench and tempering treatment. Due to the low carbon content also welding is much facilitated. The paper reveals the metallurgical principles, which are based on appropriate niobium and molybdenum alloying. Additionally the paper demonstrates how heavy gaged seamless pipes up to 70 mm wall thickness can be produced based on a low-carbon Nb-Mo approach using quench and temper treatment.

  15. Dynamics of large-diameter water pipes in hydroelectric power plants

    NASA Astrophysics Data System (ADS)

    Pavić, G.; Chevillotte, F.; Heraud, J.

    2017-04-01

    An outline is made of physical behaviour of water - filled large pipes. The fluid-wall coupling, the key factor governing the pipe dynamics, is discussed in some detail. Different circumferential pipe modes and the associated cut-on frequencies are addressed from a theoretical as well as practical point of view. Major attention is paid to the breathing mode in view of its importance regarding main dynamic phenomena, such as water hammer. Selected measurement results done at EDF are presented to demonstrate how an external, non-intrusive sensor can detect pressure pulsations of the breathing mode in a pressure pipe. Differences in the pressure measurement using intrusive and non-intrusive sensors reveal the full complexity of large-diameter pipe dynamics.

  16. Increase of reliability of contact networks of electric transport, due to increase of strength of the joint unit of pipes of different diameters

    NASA Astrophysics Data System (ADS)

    Sabitov, L. S.; Kashapov, N. F.; Gilmanshin, I. R.; Gatiyatov, I. Z.; Kuznetsov, I. L.

    2017-09-01

    The feature of the stress state of the supports of the contact networks is the presence of a joint of pipes of different diameters, the ultimate state of which is determined, as a rule, the strength of the weld. The proposed unit allows to increase the reliability and strength of the connection and also exclude the presence of a weld bead on the outer surface of the pipe of smaller diameter in the place of its attachment to the upper end of the support ring.

  17. Fatigue strength of socket welded pipe joint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Higuchi, Makoto; Hayashi, Makoto; Yamauchi, Takayoshi

    1995-12-01

    Fully reversed four point bending fatigue tests were carried out on small diameter socket welded joints made of carbon steels. Experimental parameters were pipe diameter, thicknesses of pipe and socket wall, throat depth and shape of fillet welds, slip-on and diametral gaps in the socket welding, lack of penetration at the root of fillet welds, and peening of fillet welds. In most cases a fatigue crack started from the root of the fillet, but in the case of higher stress amplitude, it tended to start from the toe of fillet. The standard socket welded joint for a pipe with amore » 50 mm nominal diameter showed a relatively low fatigue strength of 46 MPa in stress amplitude at the 10{sup 7} cycles failure life. This value corresponds to about 1/5 of that for the smoothed base metal specimens in axial fatigue. The fatigue strength decreased with increasing pipe diameter, and increased with increasing thickness of the pipe and socket wall. The effects of throat depth and shape of fillet welds on fatigue strength were not significant. Contrary to expectation, the fatigue strength of a socket welded joint without slip-on gap is Higher than that of the joint with a normal gap. A lack of penetration at the root deleteriously reduced fatigue strength, showing 14 MPa in stress amplitude at the 10{sup 7} cycles failure life for the 50 mm diameter socket joint.« less

  18. Responses of buried corrugated metal pipes to earthquakes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, C.A.; Bardet, J.P.

    2000-01-01

    This study describes the results of field investigations and analyses carried out on 61 corrugated metal pipes (CMP) that were shaken by the 1994 Northridge earthquake. These CMPs, which include 29 small-diameter (below 107 cm) CMPs and 32 large-diameter (above 107 cm) CMPs, are located within a 10 km{sup 2} area encompassing the Van Normal Complex in the Northern San Fernando Valley, in Los Angeles, California. During the Northridge earthquake, ground movements were extensively recorded within the study area. Twenty-eight of the small-diameter CMPs performed well while the 32 large-diameter CMPs underwent performances ranging from no damage to complete collapse.more » The main cause of damage to the large-diameter CMPs was found to be the large ground strains. Based on this unprecedented data set, the factors controlling the seismic performance of the 32 large-diameter CMPs were identified and framed into a pseudostatic analysis method for evaluating the response of large diameter flexible underground pipes subjected to ground strain. The proposed analysis, which is applicable to transient and permanent strains, is capable of describing the observed performance of large-diameter CMPs during the 1994 Northridge earthquake. It indicates that peak ground velocity is a more reliable parameter for analyzing pipe damage than is peak ground acceleration. Results of this field investigation and analysis are useful for the seismic design and strengthening of flexible buried conduits.« less

  19. Inspection Method for Contact Condition of Soil on the Surface of Underground Pipe Utilizing Resonance of Transverse Lamb Wave

    NASA Astrophysics Data System (ADS)

    Tanigawa, Hiroshi; Seno, Hiroaki; Watanabe, Yoshiaki; Nakajima, Koshiro

    1998-05-01

    A nondestructive inspection method to estimate the contact condition of soil on the surface of an underground pipe, utilizing the resonance of a transverse Lamb wave circulating along the pipe wall is proposed.The Q factor of the resonance is considered and measured under some contact conditions by sweeping the vibrating frequency in a 150-mm-inner diameter Fiberglass Reinforced Plastic Mortar (FRPM) pipe. It is confirmed that the Q factor shows a clear response to the change in the contact conditions. For example, the Q factor is 8.4 when the pipe is in ideal contact with the soil plane and goes up to 19.2 when a 100-mm-diameter void is located at the contact surface of the soil.The spatial resolution of the proposed inspection method is also measured by moving the sensing point along the direction of laying the length of the pipe into a 85-mm-diameter void. The resolution of the proposed method is estimated at about 50 mm.

  20. On-line measurement of diameter of hot-rolled steel tube

    NASA Astrophysics Data System (ADS)

    Zhu, Xueliang; Zhao, Huiying; Tian, Ailing; Li, Bin

    2015-02-01

    In order to design a online diameter measurement system for Hot-rolled seamless steel tube production line. On one hand, it can play a stimulate part in the domestic pipe measuring technique. On the other hand, it can also make our domestic hot rolled seamless steel tube enterprises gain a strong product competitiveness with low input. Through the analysis of various detection methods and techniques contrast, this paper choose a CCD camera-based online caliper system design. The system mainly includes the hardware measurement portion and the image processing section, combining with software control technology and image processing technology, which can complete online measurement of heat tube diameter. Taking into account the complexity of the actual job site situation, it can choose a relatively simple and reasonable layout. The image processing section mainly to solve the camera calibration and the application of a function in Matlab, to achieve the diameter size display directly through the algorithm to calculate the image. I build a simulation platform in the design last phase, successfully, collect images for processing, to prove the feasibility and rationality of the design and make error in less than 2%. The design successfully using photoelectric detection technology to solve real work problems

  1. The fabrication of integrated carbon pipes with sub-micron diameters

    NASA Astrophysics Data System (ADS)

    Kim, B. M.; Murray, T.; Bau, H. H.

    2005-08-01

    A method for fabricating integrated carbon pipes (nanopipettes) of sub-micron diameters and tens of microns in length is demonstrated. The carbon pipes are formed from a template consisting of the tip of a pulled alumino-silicate glass capillary coated with carbon deposited from a vapour phase. This method renders carbon nanopipettes without the need for ex situ assembly and facilitates parallel production of multiple carbon-pipe devices. An electric-field-driven transfer of ions in a KCl solution through the integrated carbon pipes exhibits nonlinear current-voltage (I-V) curves, markedly different from the Ohmic I-V curves observed in glass pipettes under similar conditions. The filling of the nanopipette with fluorescent suspension is also demonstrated.

  2. 75 FR 69052 - Certain Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From the People's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... seamless carbon and alloy steel standard, line, and pressure pipe (``seamless pipe'') from the People's... seamless pipe from the PRC. See Certain Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe..., and its negative determination of critical circumstances. See Certain Seamless Carbon and Alloy Steel...

  3. Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation

    NASA Astrophysics Data System (ADS)

    Razak, K. Abdul; Othman, M. I. H.; Mat Yusuf, S.; Fuad, M. F. I. Ahmad; yahaya, Effah

    2018-05-01

    Oil and gas today being developed at different water depth characterized as shallow, deep and ultra-deep waters. Among the major components involved during the offshore installation is pipelines. Pipelines are a transportation method of material through a pipe. In oil and gas industry, pipeline come from a bunch of line pipe that welded together to become a long pipeline and can be divided into two which is gas pipeline and oil pipeline. In order to perform pipeline installation, we need pipe laying barge or pipe laying vessel. However, pipe laying vessel can be divided into two types: S-lay vessel and J-lay vessel. The function of pipe lay vessel is not only to perform pipeline installation. It also performed installation of umbilical or electrical cables. In the simple words, pipe lay vessel is performing the installation of subsea in all the connecting infrastructures. Besides that, the installation processes of pipelines require special focus to make the installation succeed. For instance, the heavy pipelines may exceed the lay vessel’s tension capacities in certain kind of water depth. Pipeline have their own characteristic and we can group it or differentiate it by certain parameters such as grade of material, type of material, size of diameter, size of wall thickness and the strength. For instances, wall thickness parameter studies indicate that if use the higher steel grade of the pipelines will have a significant contribution in pipeline wall thickness reduction. When running the process of pipe lay, water depth is the most critical thing that we need to monitor and concern about because of course we cannot control the water depth but we can control the characteristic of the pipe like apply line pipe that have wall thickness suitable with current water depth in order to avoid failure during the installation. This research will analyse whether the pipeline parameter meet the requirements limit and minimum yield stress. It will overlook to simulate pipe grade API 5L X60 which size from 8 to 20mm thickness with a water depth of 50 to 300m. Result shown that pipeline installation will fail from the wall thickness of 18mm onwards since it has been passed the critical yield percentage.

  4. Time-resolved flowmetering of gas-liquid two-phase pipe flow by ultrasound pulse Doppler method

    NASA Astrophysics Data System (ADS)

    Murai, Yuichi; Tasaka, Yuji; Takeda, Yasushi

    2012-03-01

    Ultrasound pulse Doppler method is applied for componential volumetric flow rate measurement in multiphase pipe flow consisted of gas and liquid phases. The flowmetering is realized with integration of measured velocity profile over the cross section of the pipe within liquid phase. Spatio-temporal position of interface is detected also with the same ultrasound pulse, which further gives cross sectional void fraction. A series of experimental demonstration was shown by applying this principle of measurement to air-water two-phase flow in a horizontal tube of 40 mm in diameter, of which void fraction ranges from 0 to 90% at superficial velocity from 0 to 15 m/s. The measurement accuracy is verified with a volumetric type flowmeter. We also analyze the accuracy of area integration of liquid velocity distribution for many different patterns of ultrasound measurement lines assigned on the cross section of the tube. The present method is also identified to be pulsation sensor of flow rate that fluctuates with complex gas-liquid interface behavior.

  5. Evaluation of tantalum 316 stainless steel transition joints

    NASA Technical Reports Server (NTRS)

    Stoner, D. R.

    1972-01-01

    Tubular transition joints providing a metallurgically bonded connection between tantalum and 316 stainless steel pipe sections were comparatively evaluated for durability under thermal cycling conditions approximating the operation of a SNAP-8 mercury boiler. Both coextruded and vacuum brazed transition joints of 50mm (2 inch) diameter were tested by thermal cycling 100 times between 730 C and 120 C(1350 F and 250 F) in a high vacuum environment. The twelve evaluated transition joints survived the full test sequence without developing leaks, although liquid penetrant bond line indications eventually developed in all specimens. The brazed transition joints exhibited the best dimensional stability and bond line durability.

  6. Dynamic simulation of relief line during loss of insulation vacuum of the ITER cryoline

    NASA Astrophysics Data System (ADS)

    Badgujar, S.; Kosek, J.; Grillot, D.; Forgeas, A.; Sarkar, B.; Shah, N.; Choukekar, K.; Chang, H.-S.

    2017-12-01

    The ITER cryoline (CL) system consists of 37 types of vacuum jacketed transfer lines which forms a complex structured network with a total length of about 5 km, spread inside the Tokamak building, on a dedicated plant bridge and in the Cryoplant building/area. One of them, the low pressure relief line (RL) recovers helium discharged from process safety relief valves of the different cryogenic users and is sent it back to the Cryoplant via heater and recovery system. The process pipe diameters of the RL vary from DN 50 to DN 200 and the length is more than 1500 m. Loss of insulation vacuum (LIV) of a CL is one of the worst scenarios apart from LIV in Auxiliary Cold Boxes (ACBs). The Torus and Cryostat CL is chosen to simulate the virtual LIV and to study the anticipated behavior of the RL. Both helium LIV (LIV due to leak in helium pipe) and air LIV (LIV due to air ingress in outer vacuum jacket of the cryoline) with and without fire) have been simulated during this study. After the brief description of the CL system, the paper will describe the EcosimPro® model prepared for the dynamic study. The paper will also describe the results like minimum temperature of RL, mass flow and maximum pressure in the RL which are essentially used to choose the type and location of safety relief devices to protect the CL process pipes.

  7. Development of a probe for inner profile measurement and flaw detection

    NASA Astrophysics Data System (ADS)

    Yoshizawa, Toru; Wakayama, Toshitaka; Kamakura, Yoshihisa

    2011-08-01

    It is one of the important necessities to precisely measure the inner diameter and/or the inner profile of pipes, tubes and other objects similar in shape. Especially in mechanical engineering field, there are many requests from automobile industry because the inner surface of engine blocks and other die casts are strongly required to be inspected and measured by non-contact methods (not by the naked eyes inspection using a borescope). If the inner diameter is large enough like water pipes or drain pipes, complicated and large equipment may be applicable. However, small pipes with a diameter ranging from 10mm to 100mm are difficult to be inspected by such a large instrument as is used for sewers inspection. And we have proposed an instrument which has no moving elements such as a rotating mirror or a prism for scanning a beam. Our measurement method is based on optical sectioning using triangulation. This optically sectioned profile of an inner wall of pipe-like objects is analyzed to produce numerical data of inner diameter or profile. Here, we report recent development of the principle and applications of the optical instrument with a simple and compact configuration. In addition to profile measurement, we found flaws and defects on the inner wall were also detected by using the similar principle. Up to now, we have developed probes with the diameter of 8mm to 25mm for small size objects and another probe (80 mm in diameter) for such a larger container with the dimensional size of 600mm.

  8. Analysis of Ballast Water Sampling Port Designs Using Computational Fluid Dynamics

    DTIC Science & Technology

    2008-02-01

    straight, vertical, upward-flowing pipe having a sample port diameter between 1.5 and 2.0 times the basic isokinetic diameter as defined in this report...water, flow modeling, sample port, sample pipe, particle trajectory, isokinetic sampling 18. Distribution Statement This document is available to...2.0 times the basic isokinetic diameter as defined in this report. Sample ports should use ball valves for isolation purposes and diaphragm or

  9. Optimal pipe size design for looped irrigation water supply system using harmony search: Saemangeum project area.

    PubMed

    Yoo, Do Guen; Lee, Ho Min; Sadollah, Ali; Kim, Joong Hoon

    2015-01-01

    Water supply systems are mainly classified into branched and looped network systems. The main difference between these two systems is that, in a branched network system, the flow within each pipe is a known value, whereas in a looped network system, the flow in each pipe is considered an unknown value. Therefore, an analysis of a looped network system is a more complex task. This study aims to develop a technique for estimating the optimal pipe diameter for a looped agricultural irrigation water supply system using a harmony search algorithm, which is an optimization technique. This study mainly serves two purposes. The first is to develop an algorithm and a program for estimating a cost-effective pipe diameter for agricultural irrigation water supply systems using optimization techniques. The second is to validate the developed program by applying the proposed optimized cost-effective pipe diameter to an actual study region (Saemangeum project area, zone 6). The results suggest that the optimal design program, which applies an optimization theory and enhances user convenience, can be effectively applied for the real systems of a looped agricultural irrigation water supply.

  10. Optimal Pipe Size Design for Looped Irrigation Water Supply System Using Harmony Search: Saemangeum Project Area

    PubMed Central

    Lee, Ho Min; Sadollah, Ali

    2015-01-01

    Water supply systems are mainly classified into branched and looped network systems. The main difference between these two systems is that, in a branched network system, the flow within each pipe is a known value, whereas in a looped network system, the flow in each pipe is considered an unknown value. Therefore, an analysis of a looped network system is a more complex task. This study aims to develop a technique for estimating the optimal pipe diameter for a looped agricultural irrigation water supply system using a harmony search algorithm, which is an optimization technique. This study mainly serves two purposes. The first is to develop an algorithm and a program for estimating a cost-effective pipe diameter for agricultural irrigation water supply systems using optimization techniques. The second is to validate the developed program by applying the proposed optimized cost-effective pipe diameter to an actual study region (Saemangeum project area, zone 6). The results suggest that the optimal design program, which applies an optimization theory and enhances user convenience, can be effectively applied for the real systems of a looped agricultural irrigation water supply. PMID:25874252

  11. Analysis of daylight performance of solar light pipes influenced by size and shape of sunlight captures

    NASA Astrophysics Data System (ADS)

    Wu, Yanpeng; Jin, Rendong; Zhang, Wenming; Liu, Li; Zou, Dachao

    2009-11-01

    Experimental investigations on three different sunlight captures with diameter 150mm, 212mm, 300mm were carried out under different conditions such as sunny conditions, cloudy conditions and overcast conditions and the two different size solar light pipes with diameter 360mm and 160mm under sunny conditions. The illuminance in the middle of the sunlight capture have relationship with its size, but not linear. To improve the efficiency of the solar light pipes, the structure and the performance of the sunlight capture must be enhanced. For example, University of Science and Technology Beijing Gymnasium, Beijing 2008 Olympic events of Judo and Taekwondo, 148 solar light pipes were installed with the diameter 530mm for each light pipe. Two sunlight captures with different shape were installed and tested. From the measuring results of the illuminance on the work plane of the gymnasium, the improvement sunlight captures have better effects with the size of augmenting and the machining of the internal surface at the same time, so that the refraction increased and the efficiency of solar light pipes improved. The better effects of supplementary lighting for the gymnasium have been achieved.

  12. A Workshop on Environmental Technology Assessment Held at the University of Cambridge, England Held on 24-26 April, 1985,

    DTIC Science & Technology

    1985-01-01

    almost immediately upon corona onset, the current starts to flow uncontrollably with an immediate decrease in voltage which stops the ESP from...operating. With large diameter electrodes, the current starts to flow at the corona onset point and there is a range where it varies with increasing voltage...Modal. WEST GERMANY - Use of a Pibersape for Control Purpoaes in toe sarixo uitr3ioutioa bysta. -Special Cent Mortar Lining of Ductile Cat Iron Pipes

  13. 75 FR 62525 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    .... Docket Numbers: RP10-1400-000. Applicants: Chandeleur Pipe Line Company. Description: Chandeleur Pipe Line Company submits tariff filing per 154.203: Chandeleur Pipe Line Company Baseline FERC Gas Tariff...

  14. 24 CFR 3280.611 - Vents and venting.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... drain piping for each toilet shall be vented by a 11/2 inch minimum diameter vent or rectangular vent of..., connected to the toilet drain by one of the following methods: (i) A 11/2 inch diameter (min.) individual vent pipe or equivalent directly connected to the toilet drain within the distance allowed in § 3280...

  15. Flow accelerated corrosion of carbon steel feeder pipes from pressurized heavy water reactors

    NASA Astrophysics Data System (ADS)

    Singh, J. L.; Kumar, Umesh; Kumawat, N.; Kumar, Sunil; Kain, Vivekanand; Anantharaman, S.; Sinha, A. K.

    2012-10-01

    Detailed investigation of a number of feeder pipes received from Rajasthan Atomic Power Station Unit 2 (RAPS#2) after en-masse feeder pipe replacement after 15.67 Effective Full Power Years (EFPYs) was carried out. Investigations included ultrasonic thickness measurement by ultrasonic testing, optical microscopy, scanning electron microscopy, chemical analysis and X-ray Diffraction (XRD). Results showed that maximum thickness reduction of the feeder had occurred downstream and close to the weld in 32 NB (1.25″/32.75 mm ID) elbows. Rate of Flow Accelerated Corrosion (FAC) was measured to be higher in the lower diameter feeder pipes due to high flow velocity and turbulence. Weld regions had thinned to a lower extent than the parent material due to higher chromium content in the weld. A weld protrusion has been shown to add to the thinning due to FAC and lead to faster thinning rate at localized regions. Surface morphology of inner surface of feeder had shown different size scallop pattern over the weld and parent material. Inter-granular cracks were also observed along the weld fusion line and in the parent material in 32 NB outlet feeder elbow.

  16. A bubble detection system for propellant filling pipeline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wen, Wen; Zong, Guanghua; Bi, Shusheng

    2014-06-15

    This paper proposes a bubble detection system based on the ultrasound transmission method, mainly for probing high-speed bubbles in the satellite propellant filling pipeline. First, three common ultrasonic detection methods are compared and the ultrasound transmission method is used in this paper. Then, the ultrasound beam in a vertical pipe is investigated, suggesting that the width of the beam used for detection is usually smaller than the internal diameter of the pipe, which means that when bubbles move close to the pipe wall, they may escape from being detected. A special device is designed to solve this problem. It canmore » generate the spiral flow to force all the bubbles to ascend along the central line of the pipe. In the end, experiments are implemented to evaluate the performance of this system. Bubbles of five different sizes are generated and detected. Experiment results show that the sizes and quantity of bubbles can be estimated by this system. Also, the bubbles of different radii can be distinguished from each other. The numerical relationship between the ultrasound attenuation and the bubble radius is acquired and it can be utilized for estimating the unknown bubble size and measuring the total bubble volume.« less

  17. Corrosion of Spiral Rib Aluminized Pipe

    DOT National Transportation Integrated Search

    2012-08-01

    Large diameter, corrugated steel pipes are a common sight in the culverts that run alongside many Florida roads. Spiral-ribbed aluminized pipe (SRAP) has been widely specified by the Florida Department of Transportation (FDOT) for runoff drainage. Th...

  18. Corrosion of Spiral Rib Aluminized Pipe : [Summary

    DOT National Transportation Integrated Search

    2012-01-01

    Large diameter, corrugated steel pipes are a common sight in the culverts that run alongside many Florida roads. Spiral-ribbed aluminized pipe (SRAP) has been widely specified by the Florida Department of Transportation (FDOT) for runoff drainage. Th...

  19. Influence of dimension parameters of the gravity heat pipe on the thermal performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kosa, Ľuboš, E-mail: lubos.kosa@fstroj.uniza.sk; Nemec, Patrik, E-mail: patrik.nemec@fstroj.uniza.sk; Jobb, Marián, E-mail: marian.jobb@fstroj.uniza.sk

    Currently the problem with the increasing number of electronic devices is a problem with the outlet Joule heating. Joule heating, also known as ohmic heating and resistive heating, is the process by which the passage of an electric current through a conductor releases heat. Perfect dustproof cooling of electronic components ensures longer life of the equipment. One of more alternatives of heat transfer without the using of mechanical equipment is the use of the heat pipe. Heat pipes are easy to manufacture and maintenance of low input investment cost. The advantage of using the heat pipe is its use inmore » hermetic closed electronic device which is separated exchange of air between the device and the environment. This experiment deals with the influence of changes in the working tube diameter and changing the working fluid on performance parameters. Changing the working fluid and the tube diameter changes the thermal performance of the heat pipe. The result of this paper is finding the optimal diameter with ideal working substance for the greatest heat transfer for 1cm{sup 2} sectional area tube.« less

  20. Removal of unwanted fluid

    NASA Astrophysics Data System (ADS)

    Subudhi, Sudhakar; Sreenivas, K. R.; Arakeri, Jaywant H.

    2013-01-01

    This work is concerned with the removal of unwanted fluid through the source-sink pair. The source consists of fluid issuing out of a nozzle in the form of a jet and the sink is a pipe that is kept some distance from the source pipe. Of concern is the percentage of source fluid sucked through the sink. The experiments have been carried in a large glass water tank. The source nozzle diameter is 6 mm and the sink pipe diameter is either 10 or 20 mm. The horizontal and vertical separations and angles between these source and sink pipes are adjustable. The flow was visualized using KMnO4 dye, planer laser induced fluorescence and particle streak photographs. To obtain the effectiveness (that is percentage of source fluid entering the sink pipe), titration method is used. The velocity profiles with and without the sink were obtained using particle image velocimetry. The sink flow rate to obtain a certain effectiveness increase dramatically with lateral separation. The sink diameter and the angle between source and the sink axes don't influence effectiveness as much as the lateral separation.

  1. 6. VIEW OF SHOWING DOWNSTREAM OUTLET PIPE AND COLLAR (12' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF SHOWING DOWNSTREAM OUTLET PIPE AND COLLAR (12' DIAMETER CORRUGATED STEEL PIPE ENCASED IN 6' CONCRETE), LOOKING NORTH - High Mountain Dams in Bonneville Unit, Island Lake Dam, Wasatch National Forest, Kamas, Summit County, UT

  2. 77 FR 43806 - Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From the People's Republic of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... duty order on seamless carbon and alloy steel standard, line, and pressure pipe from the People's... the antidumping duty order on seamless carbon and alloy steel standard, line, and pressure pipe from... Making Co., Ltd.; Wuxi Seamless Special Pipe Co., Ltd.; Wuxi Sifang Steel Tube Co., Ltd.; Wuxi Zhenda...

  3. 75 FR 13255 - Certain Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe from the People's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... seamless carbon and alloy steel standard, line, and pressure pipe (``seamless pipe'') from the People's... countervailing duty investigations of seamless pipe from the PRC. See Certain Seamless Carbon and Alloy Steel... Investigation, 74 FR 52744 (October 14, 2009) and Certain Seamless Carbon and Alloy Steel Standard, Line, and...

  4. 76 FR 60083 - Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Japan and Romania

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... Alloy Seamless Standard, Line, and Pressure Pipe From Japan and Romania Determinations On the basis of... pressure pipe from Japan and Romania would be likely to lead to continuation or recurrence of material... Seamless Standard, Line, and Pressure Pipe from Japan and Romania: Investigation Nos. 731-TA-847 and 849...

  5. Protection of Buried Pipe under Repeated Loading by Geocell Reinforcement

    NASA Astrophysics Data System (ADS)

    Khalaj, Omid; Joz Darabi, N.; Moghaddas Tafreshi, S. N.; Mašek, Bohuslav

    2017-12-01

    With increase in cities’ population and development of urbane life, passing buried pipelines near ground’s surface is inevitable in urban areas, roads, subways and highways. This paper presents the results of three-dimensional full scale model tests on high-density polyethylene (HDPE) pipe with diameter of 250 mm in geocell reinforced soil, subjected to repeated loading to simulate the vehicle loads. The effect of geocell’s pocket size (55*55 mm and 110*110 mm) and embedment depth of buried pipe (1.5 and 2 times pipe diameter) in improving the behaviour of buried pipes was investigated. The geocell’s height of 100 mm was used in all tests. The repeated load of 800 kPa was applied on circular loading plate with diameter of 250 mm. The results show that the pipe displacement, soil surface settlement and transferred pressure on the pipe’s crown has been influenced significantly upon the use of geocells. For example, the vertical diametric strain (VDS) and soil surface settlement (SSS), in a way that using a geocell with pocket size of 110*110 mm reduces by 27% and 43%, respectively, compared with the unreinforced one. Meanwhile, by increasing buried depth of pipe from 1.5D to 2D, the use of geocell of 110*110 mm delivers about 50% reduction in SSS and VDS, compared with the unreinforced soil.

  6. Moving Bed Granular Bed Filter Development Program. Topical report, September 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haas, J.C.; Prudhomme, J.W.; Wilson, K.W.

    1994-09-01

    Five test arrangements have been designed to support the Granular Bed Filter Development Program as defined in the Test Plan. The first arrangement is a 3.6 ft. diameter half filter, with a glass covering along the cross section to allow visual examination of the granular alumina material passing through the filter. The second test arrangement is a 3.6 ft diameter full size filter having refractory lining to simulate actual surface roughness conditions. The third test arrangement will examine filter geometry scale up by testing a 6.0 ft. diameter full size filter. The fourth Test Arrangement consists of a small 12more » inch diameter fluidizer to measure the minimum fluidization velocity of the 7 m (approx. size) alumina material to be used in the filter assemblies. The last Test Unit is used to evaluation relative abrasion characteristics of potential refractory and ceramic materials to be installed in high abrasion areas in the pneumatic transport piping.« less

  7. Accounting For Compressibility In Viscous Flow In Pipes

    NASA Technical Reports Server (NTRS)

    Steinle, Frank W.; Gee, Ken; Murthy, Sreedhara V.

    1991-01-01

    Method developed to account for effects of compressibility in viscous flows through long, circular pipes of uniform diameter. Based on approximation of variations in density and velocity across pipe cross section by profile equations developed for boundary-layer flow between flat plates.

  8. Testing large volume water treatment and crude oil ...

    EPA Pesticide Factsheets

    Report EPA’s Homeland Security Research Program (HSRP) partnered with the Idaho National Laboratory (INL) to build the Water Security Test Bed (WSTB) at the INL test site outside of Idaho Falls, Idaho. The WSTB was built using an 8-inch (20 cm) diameter cement-mortar lined drinking water pipe that was previously taken out of service. The pipe was exhumed from the INL grounds and oriented in the shape of a small drinking water distribution system. Effluent from the pipe is captured in a lagoon. The WSTB can support drinking water distribution system research on a variety of drinking water treatment topics including biofilms, water quality, sensors, and homeland security related contaminants. Because the WSTB is constructed of real drinking water distribution system pipes, research can be conducted under conditions similar to those in a real drinking water system. In 2014, WSTB pipe was experimentally contaminated with Bacillus globigii spores, a non-pathogenic surrogate for the pathogenic B. anthracis, and then decontaminated using chlorine dioxide. In 2015, the WSTB was used to perform the following experiments: • Four mobile disinfection technologies were tested for their ability to disinfect large volumes of biologically contaminated “dirty” water from the WSTB. B. globigii spores acted as the biological contaminant. The four technologies evaluated included: (1) Hayward Saline C™ 6.0 Chlorination System, (2) Advanced Oxidation Process (A

  9. An automated inner dimensional measurement system based on a laser displacement sensor for long-stepped pipes.

    PubMed

    Zhang, Fumin; Qu, Xinghua; Ouyang, Jianfei

    2012-01-01

    A novel measurement prototype based on a mobile vehicle that carries a laser scanning sensor is proposed. The prototype is intended for the automated measurement of the interior 3D geometry of large-diameter long-stepped pipes. The laser displacement sensor, which has a small measurement range, is mounted on an extended arm of known length. It is scanned to improve the measurement accuracy for large-sized pipes. A fixing mechanism based on two sections is designed to ensure that the stepped pipe is concentric with the axis of rotation of the system. Data are acquired in a cylindrical coordinate system and fitted in a circle to determine diameter. Systematic errors covering arm length, tilt, and offset errors are analyzed and calibrated. The proposed system is applied to sample parts and the results are discussed to verify its effectiveness. This technique measures a diameter of 600 mm with an uncertainty of 0.02 mm at a 95% confidence probability. A repeatability test is performed to examine precision, which is 1.1 μm. A laser tracker is used to verify the measurement accuracy of the system, which is evaluated as 9 μm within a diameter of 600 mm.

  10. 75 FR 26273 - Certain Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From China

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... certain seamless carbon and alloy steel standard, line, and pressure pipe (``seamless SLP pipe... China of seamless SLP pipe, and that such products are being sold in the United States at less than fair...

  11. 75 FR 69125 - Certain Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From China

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... standard, line, and pressure pipe (``seamless SLP pipe''), provided for in subheadings 7304.19.10, 7304.19... Charlotte R. Lane determines that the domestic seamless SLP pipe industry is materially injured by reason of... notification of preliminary determinations by Commerce that imports of seamless SLP pipe from China were...

  12. 76 FR 44608 - Carbon and Alloy Seamless Standard, Line, and Pressure Pipe From Japan and Romania; Scheduling of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... Alloy Seamless Standard, Line, and Pressure Pipe From Japan and Romania; Scheduling of Expedited Five-Year Reviews Concerning the Antidumping Duty Orders on Carbon and Alloy Seamless Standard, Line, and... the antidumping duty orders on carbon and alloy seamless standard, line, and pressure pipe from Japan...

  13. Experimental Verification of Steel Pipe Collapse under Vacuum Pressure Conditions

    NASA Astrophysics Data System (ADS)

    Autrique, R.; Rodal, E.

    2016-11-01

    Steel pipes are used widely in hydroelectric systems and in pumping systems. Both systems are subject to hydraulic transient effects caused by changes in boundary conditions, such as sudden valve closures, pump failures, or accidents. Water column separation, and its associated vaporization pressure inside the pipe, can cause the collapse of thin walled steel pipes subject to atmospheric pressure, as happened during the well known Oigawa Power Plant accident in Japan, in 1950. The conditions under which thin walled pipes subject to external pressure can collapse have been studied mathematically since the second half of the XIX century, with classical authors Southwell and Von Mises obtaining definitive equations for long and short pipes in the second decade of the XX century, in which the fundamental variables are the diameter to thickness ratio D/t and the length to diameter ratio L/D. In this paper, the predicted critical D/t ratio for steel pipe collapse is verified experimentally, in a physical model able to reproduce hydraulic transients, generating vacuum pressures through rapid upstream valve closures.

  14. The small community solar thermal power experiment. Parabolic dish technology for industrial process heat application

    NASA Technical Reports Server (NTRS)

    Polzien, R. E.; Rodriguez, D.

    1981-01-01

    Aspects of incorporating a thermal energy transport system (ETS) into a field of parabolic dish collectors for industrial process heat (IPH) applications were investigated. Specific objectives are to: (1) verify the mathematical optimization of pipe diameters and insulation thicknesses calculated by a computer code; (2) verify the cost model for pipe network costs using conventional pipe network construction; (3) develop a design and the associated production costs for incorporating risers and downcomers on a low cost concentrator (LCC); (4) investigate the cost reduction of using unconventional pipe construction technology. The pipe network design and costs for a particular IPH application, specifically solar thermally enhanced oil recovery (STEOR) are analyzed. The application involves the hybrid operation of a solar powered steam generator in conjunction with a steam generator using fossil fuels to generate STEOR steam for wells. It is concluded that the STEOR application provides a baseline pipe network geometry used for optimization studies of pipe diameter and insulation thickness, and for development of comparative cost data, and operating parameters for the design of riser/downcomer modifications to the low cost concentrator.

  15. OTEC Cold Water Pipe-Platform Subsystem Dynamic Interaction Validation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Varley, Robert; Halkyard, John; Johnson, Peter

    A commercial floating 100-megawatt (MW) ocean thermal energy conversion (OTEC) power plant will require a cold water pipe (CWP) with a diameter of 10-meter (m) and length of up to 1,000 m. The mass of the cold water pipe, including entrained water, can exceed the mass of the platform supporting it. The offshore industry uses software-modeling tools to develop platform and riser (pipe) designs to survive the offshore environment. These tools are typically validated by scale model tests in facilities able to replicate real at-sea meteorological and ocean (metocean) conditions to provide the understanding and confidence to proceed to finalmore » design and full-scale fabrication. However, today’s offshore platforms (similar to and usually larger than those needed for OTEC applications) incorporate risers (or pipes) with diameters well under one meter. Secondly, the preferred construction method for large diameter OTEC CWPs is the use of composite materials, primarily a form of fiber-reinforced plastic (FRP). The use of these material results in relatively low pipe stiffness and large strains compared to steel construction. These factors suggest the need for further validation of offshore industry software tools. The purpose of this project was to validate the ability to model numerically the dynamic interaction between a large cold water-filled fiberglass pipe and a floating OTEC platform excited by metocean weather conditions using measurements from a scale model tested in an ocean basin test facility.« less

  16. A diameter-sensitive flow entropy method for reliability consideration in water distribution system design

    NASA Astrophysics Data System (ADS)

    Liu, Haixing; Savić, Dragan; Kapelan, Zoran; Zhao, Ming; Yuan, Yixing; Zhao, Hongbin

    2014-07-01

    Flow entropy is a measure of uniformity of pipe flows in water distribution systems. By maximizing flow entropy one can identify reliable layouts or connectivity in networks. In order to overcome the disadvantage of the common definition of flow entropy that does not consider the impact of pipe diameter on reliability, an extended definition of flow entropy, termed as diameter-sensitive flow entropy, is proposed. This new methodology is then assessed by using other reliability methods, including Monte Carlo Simulation, a pipe failure probability model, and a surrogate measure (resilience index) integrated with water demand and pipe failure uncertainty. The reliability assessment is based on a sample of WDS designs derived from an optimization process for each of the two benchmark networks. Correlation analysis is used to evaluate quantitatively the relationship between entropy and reliability. To ensure reliability, a comparative analysis between the flow entropy and the new method is conducted. The results demonstrate that the diameter-sensitive flow entropy shows consistently much stronger correlation with the three reliability measures than simple flow entropy. Therefore, the new flow entropy method can be taken as a better surrogate measure for reliability and could be potentially integrated into the optimal design problem of WDSs. Sensitivity analysis results show that the velocity parameters used in the new flow entropy has no significant impact on the relationship between diameter-sensitive flow entropy and reliability.

  17. WATER QUALITY AND TREATMENT CONSIDERATIONS FOR CEMENT-LINED AND A-C PIPE

    EPA Science Inventory

    Both cement mortar lined (CML) and asbestos-cement pipes (A-C) are widely used in many water systems. Cement linings are also commonly applied in-situ after pipe cleaning, usually to prevent the recurrence of red water or tuberculation problems. Unfortunately, little consideratio...

  18. Generation of Turbulent Inflow Conditions for Pipe Flow via an Annular Ribbed Turbulator

    NASA Astrophysics Data System (ADS)

    Moallemi, Nima; Brinkerhoff, Joshua

    2016-11-01

    The generation of turbulent inflow conditions adds significant computational expense to direct numerical simulations (DNS) of turbulent pipe flows. Typical approaches involve introducing boxes of isotropic turbulence to the velocity field at the inlet of the pipe. In the present study, an alternative method is proposed that incurs a lower computational cost and allows the anisotropy observed in pipe turbulence to be physically captured. The method is based on a periodic DNS of a ribbed turbulator upstream of the inlet boundary of the pipe. The Reynolds number based on the bulk velocity and pipe diameter is 5300 and the blockage ratio (BR) is 0.06 based on the rib height and pipe diameter. The pitch ratio is defined as the ratio of rib streamwise spacing to rib height and is varied between 1.7 and 5.0. The generation of turbulent flow structures downstream of the ribbed turbulator are identified and discussed. Suitability of this method for accurate representation of turbulent inflow conditions is assessed through comparison of the turbulent mean properties, fluctuations, Reynolds stress profiles, and spectra with published pipe flow DNS studies. The DNS results achieve excellent agreement with the numerical and experimental data available in the literature.

  19. 77 FR 47058 - Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... Corps of Engineers, and U.S. Department of Transportation Pipeline and Hazardous Materials Safety...] Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the...) proposed by Transcontinental Gas Pipe Line Company (Transco) in the above-referenced docket. Transco...

  20. Effects of Stormwater Pipe Size and Rainfall on Sediment and Nutrients Delivered to a Coastal Bayou

    EPA Science Inventory

    Pollutants discharged from stormwater pipes can cause water quality and ecosystem problems in coastal bayous. A study was conducted to characterize sediment and nutrients discharged by small and large (, 20 cm and .20 cm in internal diameters, respectively) pipes under different ...

  1. The effect of advanced treatment on chlorine decay in metallic pipes

    EPA Science Inventory

    Experiments were run to measure what effect advanced treatment might have on the kinetics of chlorine decay in water distribution systems. A recirculating loop of 6-inch diameter unlined ductile iron pipe was used to simulate turbulent flow conditions in a pipe with significant c...

  2. APPLICATION OF STEEL PIPE PILE LOADING TESTS TO DESIGN VERIFICATION OF FOUNDATION OF THE TOKYO GATE BRIDGE

    NASA Astrophysics Data System (ADS)

    Saitou, Yutaka; Kikuchi, Yoshiaki; Kusakabe, Osamu; Kiyomiya, Osamu; Yoneyama, Haruo; Kawakami, Taiji

    Steel sheet pipe pile foundations with large diameter steel pipe sheet pile were used for the foundation of the main pier of the Tokyo Gateway bridge. However, as for the large diameter steel pipe pile, the bearing mechanism including a pile tip plugging effect is still unclear due to lack of the practical examinations even though loading tests are performed on Trans-Tokyo Bay Highway. In the light of the foregoing problems, static pile loading tests both vertical and horizontal directions, a dynamic loading test, and cone penetration tests we re conducted for determining proper design parameters of the ground for the foundations. Design parameters were determined rationally based on the tests results. Rational design verification was obtained from this research.

  3. Small, Untethered, Mobile Robots for Inspecting Gas Pipes

    NASA Technical Reports Server (NTRS)

    Wilcox, Brian

    2003-01-01

    Small, untethered mobile robots denoted gas-pipe explorers (GPEXs) have been proposed for inspecting the interiors of pipes used in the local distribution natural gas. The United States has network of gas-distribution pipes with a total length of approximately 109 m. These pipes are often made of iron and steel and some are more than 100 years old. As this network ages, there is a need to locate weaknesses that necessitate repair and/or preventive maintenance. The most common weaknesses are leaks and reductions in thickness, which are caused mostly by chemical reactions between the iron in the pipes and various substances in soil and groundwater. At present, mobile robots called pigs are used to inspect and clean the interiors of gas-transmission pipelines. Some carry magnetic-flux-leakage (MFL) sensors for measuring average wall thicknesses, some capture images, and some measure sizes and physical conditions. The operating ranges of pigs are limited to fairly straight sections of wide transmission- type (as distinguished from distribution- type) pipes: pigs are too large to negotiate such obstacles as bends with radii comparable to or smaller than pipe diameters, intrusions of other pipes at branch connections, and reductions in diameter at valves and meters. The GPEXs would be smaller and would be able to negotiate sharp bends and other obstacles that typically occur in gas-distribution pipes.

  4. Modeling benzene permeation through drinking water high density polyethylene (HDPE) pipes.

    PubMed

    Mao, Feng; Ong, Say Kee; Gaunt, James A

    2015-09-01

    Organic compounds such as benzene, toluene, ethyl benzene and o-, m-, and p-xylene from contaminated soil and groundwater may permeate through thermoplastic pipes which are used for the conveyance of drinking water in water distribution systems. In this study, permeation parameters of benzene in 25 mm (1 inch) standard inside dimension ratio (SIDR) 9 high density polyethylene (HDPE) pipes were estimated by fitting the measured data to a permeation model based on a combination of equilibrium partitioning and Fick's diffusion. For bulk concentrations between 6.0 and 67.5 mg/L in soil pore water, the concentration-dependent diffusion coefficients of benzene were found to range from 2.0×10(-9) to 2.8×10(-9) cm2/s while the solubility coefficient was determined to be 23.7. The simulated permeation curves of benzene for SIDR 9 and SIDR 7 series of HDPE pipes indicated that small diameter pipes were more vulnerable to permeation of benzene than large diameter pipes, and the breakthrough of benzene into the HDPE pipe was retarded and the corresponding permeation flux decreased with an increase of the pipe thickness. HDPE pipes exposed to an instantaneous plume exhibited distinguishable permeation characteristics from those exposed to a continuous source with a constant input. The properties of aquifer such as dispersion coefficients (DL) also influenced the permeation behavior of benzene through HDPE pipes.

  5. 76 FR 61682 - Panhandle Eastern Pipe Line Company, LP; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-546-000] Panhandle Eastern Pipe Line Company, LP; Notice of Application On September 16, 2011, Panhandle Eastern Pipe Line... free). For TTY, call (202) 502-8659. Comment Date: 5 p.m. Eastern Time on October 19, 2011. Dated...

  6. 76 FR 58263 - Kenai Pipe Line Company; Tesoro Alaska Company; Tesoro Logistics Operations, LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR11-21-000] Kenai Pipe Line Company; Tesoro Alaska Company; Tesoro Logistics Operations, LLC; Notice of Request for Jurisdictional..., 2011, Kenai Pipe Line Company (KPL), Tesoro Alaska Company (Tesoro Alaska), and Tesoro Logistics, LLC...

  7. 30 CFR 75.1905-1 - Diesel fuel piping systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... entry as electric cables or power lines. Where it is necessary for piping systems to cross electric cables or power lines, guarding must be provided to prevent severed electrical cables or power lines near... storage facility. (h) The diesel fuel piping system must not be located in a borehole with electric power...

  8. 30 CFR 75.1905-1 - Diesel fuel piping systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... entry as electric cables or power lines. Where it is necessary for piping systems to cross electric cables or power lines, guarding must be provided to prevent severed electrical cables or power lines near... storage facility. (h) The diesel fuel piping system must not be located in a borehole with electric power...

  9. 75 FR 9163 - Certain Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From the People's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Alloy Steel Standard, Line, and Pressure Pipe From the People's Republic of China: Preliminary... the People's Republic of China. For information on the estimated subsidy rates, see the ``Suspension... Carbon and Alloy Steel Standard, Line, and Pressure Pipe from the People's Republic of China: Initiation...

  10. 78 FR 2380 - Transcontinental Gas Pipe Line Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... new compressor station with two 10,915 horsepower (ISO) gas turbine-driven compressor; and the...] Transcontinental Gas Pipe Line Company, LLC; Notice of Application Take notice that on December 19, 2012, Transcontinental Gas Pipe Line Company, LLC (Transco), Post Office Box 1396, Houston, Texas 77251, filed in the...

  11. An Automated Inner Dimensional Measurement System Based on a Laser Displacement Sensor for Long-Stepped Pipes

    PubMed Central

    Zhang, Fumin; Qu, Xinghua; Ouyang, Jianfei

    2012-01-01

    A novel measurement prototype based on a mobile vehicle that carries a laser scanning sensor is proposed. The prototype is intended for the automated measurement of the interior 3D geometry of large-diameter long-stepped pipes. The laser displacement sensor, which has a small measurement range, is mounted on an extended arm of known length. It is scanned to improve the measurement accuracy for large-sized pipes. A fixing mechanism based on two sections is designed to ensure that the stepped pipe is concentric with the axis of rotation of the system. Data are acquired in a cylindrical coordinate system and fitted in a circle to determine diameter. Systematic errors covering arm length, tilt, and offset errors are analyzed and calibrated. The proposed system is applied to sample parts and the results are discussed to verify its effectiveness. This technique measures a diameter of 600 mm with an uncertainty of 0.02 mm at a 95% confidence probability. A repeatability test is performed to examine precision, which is 1.1 μm. A laser tracker is used to verify the measurement accuracy of the system, which is evaluated as 9 μm within a diameter of 600 mm. PMID:22778615

  12. The Effects of an Unexpected Ceramic Coating Phase at the Head of a Pipe on Joining and Postprocessing of a Ceramic-Lined Composite Pipe

    NASA Astrophysics Data System (ADS)

    Mahmoodian, R.; Rahbari, R. G.; Hamdi, M.; Hassan, M. A.; Sparham, Mahdi

    2013-01-01

    Produced ceramic-lined steel pipe using the self-propagating high-temperature synthesis (SHS) method has found uses in many applications. A SHS-centrifugal machine was designed to produce a ceramic-lined steel pipe from ferric oxide and aluminum powder (thermite mixture) under high centrifugal acceleration. The obtained products are expected to be Al2O3 ceramic in the innermost layer and a Fe layer in a region between the outer steel pipes. In the present work, specific regions of a pipe was particularly observed to investigate the stuck (dead) spaces at the pipe head because of its importance in further processes (joining, welding, etc.) which may affect the quality of the next operations. In this article, the product's composition, phase separation, microhardness, and surface finish were studied on three zones of the pipe.

  13. Void fraction development in gas-liquid flow after a U-bend in a vertically upwards serpentine-configuration large-diameter pipe

    NASA Astrophysics Data System (ADS)

    Almabrok, Almabrok A.; Aliyu, Aliyu M.; Baba, Yahaya D.; Lao, Liyun; Yeung, Hoi

    2018-01-01

    We investigate the effect of a return U-bend on flow behaviour in the vertical upward section of a large-diameter pipe. A wire mesh sensor was employed to study the void fraction distributions at axial distances of 5, 28 and 47 pipe diameters after the upstream bottom bend. The study found that, the bottom bend has considerable impacts on up-flow behaviour. In all conditions, centrifugal action causes appreciable misdistribution in the adjacent straight section. Plots from WMS measurements show that flow asymmetry significantly reduces along the axis at L/D = 47. Regime maps generated from three axial locations showed that, in addition to bubbly, intermittent and annular flows, oscillatory flow occurred particularly when gas and liquid flow rates were relatively low. At this position, mean void fractions were in agreement with those from other large-pipe studies, and comparisons were made with existing void fraction correlations. Among the correlations surveyed, drift flux-type correlations were found to give the best predictive results.

  14. Acoustic Guided Wave Testing of Pipes of Small Diameters

    NASA Astrophysics Data System (ADS)

    Muravev, V. V.; Muraveva, O. V.; Strizhak, V. A.; Myshkin, Y. V.

    2017-10-01

    Acoustic path is analyzed and main parameters of guided wave testing are substanti- ated applied to pipes of small diameters. The method is implemented using longitudinal L(0,1) and torsional T(0,1) waves based on electromagnetic-acoustic (EMA) transducers. The method of multiple reflections (MMR) combines echo-through, amplitude-shadow and time-shadow methods. Due to the effect of coherent amplification of echo-pulses from defects the sensitivity to the defects of small sizes at the signal analysis on the far reflections is increased. An oppor- tunity of detection of both local defects (dents, corrosion damages, rolling features, pitting, cracks) and defects extended along the pipe is shown.

  15. Pipe crawler apparatus

    DOEpatents

    Hovis, Gregory L.; Erickson, Scott A.; Blackmon, Bruce L.

    2002-01-01

    A pipe crawler apparatus particularly useful for 3-inch and 4-inch diameter pipes is provided. The pipe crawler apparatus uses a gripping apparatus in which a free end of a piston rod is modified with a bearing retaining groove. Bearings, placed within the groove, are directed against a camming surface of three respective pivoting support members. The non-pivoting ends of the support members carry a foot-like gripping member that, upon pivoting of the support member, engages the interior wall of the pipe.

  16. A Capsule-Type Electromagnetic Acoustic Transducer for Fast Screening of External Corrosion in Nonmagnetic Pipes.

    PubMed

    Li, Yong; Cai, Rui; Yan, Bei; Zainal Abidin, Ilham Mukriz; Jing, Haoqing; Wang, Yi

    2018-05-28

    For fuel transmission and structural strengthening, small-diameter pipes of nonmagnetic materials are extensively adopted in engineering fields including aerospace, energy, transportation, etc. However, the hostile and corrosive environment leaves them vulnerable to external corrosion which poses a severe threat to structural integrity of pipes. Therefore, it is imperative to nondestructively detect and evaluate the external corrosion in nonmagnetic pipes. In light of this, a capsule-type Electromagnetic Acoustic Transducer (EMAT) for in-situ nondestructive evaluation of nonmagnetic pipes and fast screening of external corrosion is proposed in this paper. A 3D hybrid model for efficient prediction of responses from the proposed transducer to external corrosion is established. Closed-form expressions of field quantities of electromagnetics and EMAT signals are formulated. Simulations based on the hybrid model indicate feasibility of the proposed transducer in detection and evaluation of external corrosion in nonmagnetic pipes. In parallel, experiments with the fabricated transducer have been carried out. Experimental results are supportive of the conclusion drawn from simulations. The investigation via simulations and experiments implies that the proposed capsule-type EMAT is capable of fast screening of external corrosion, which is beneficial to the in-situ nondestructive evaluation of small-diameter nonmagnetic pipes.

  17. 78 FR 33809 - Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From the People's Republic of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... review of the antidumping duty order on seamless carbon and alloy steel standard, line, and pressure pipe... seamless carbon and alloy steel standard, line, and pressure pipe from the People's Republic of China... DEPARTMENT OF COMMERCE International Trade Administration [A-570-956] Seamless Carbon and Alloy...

  18. 75 FR 1051 - Transcontinental Gas Pipe Line Company, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-17-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Filing December 31, 2009. Take notice that on November 12, 2009, Transcontinental Gas Pipe Line Company, LLC (Transco), tendered for filing an application for an order permitting and approving the partial...

  19. 75 FR 42436 - Houston Pipe Line Company LP-Bammel Storage, Docket No. PR10-51-000, et. al.; Notice of Baseline...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Houston Pipe Line Company LP--Bammel Storage, Docket No. PR10-51- 000, et. al.; Notice of Baseline Filings July 14, 2010. Houston Pipe Line..., 2010, respectively the applicants listed above submitted their baseline filing of its Statement of...

  20. 75 FR 22372 - Certain Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From the People's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... Alloy Steel Standard, Line, and Pressure Pipe From the People's Republic of China: Preliminary..., line, and pressure pipe from the People's Republic of China (``PRC'') is being, or is likely to be...'s Republic of China, dated September 16, 2009 (``Petition''). On September 28, 2009, TMK IPSCO and...

  1. Experimental study of geysers through a vent pipe connected to flowing sewers.

    PubMed

    Huang, Biao; Wu, Shiqiang; Zhu, David Z; Schulz, Harry E

    2017-04-01

    Geysers of air-water mixtures in urban drainage systems is receiving considerable attention due to public safety concerns. However, the geyser formation process and its relation with air release from pressurized pipes are still relatively little known. A large-scale physical model, that consisted of a main tunnel with a diameter of 270 mm and a length of 25 m connecting two reservoirs and a vertical vent pipe, was established to investigate geyser evolution and pressure transients. Experimental results including dynamic pressure data and high speed videos were analysed in order to characterize geysering flow through the vent pipe. Pressure transients were observed during geysering events. Their amplitudes were found to be about three times the driving pressure head and their periods were close to the classic surge tank predictions. The influence of flow rate and vent pipe size were examined: geyser heights and pressure peaks decreased for small flow rate and large diameter vent pipe. It is suggested that geyser heights are related with the pressure head and the density of the air-water mixture.

  2. System-level Analysis of Chilled Water Systems Aboard Naval Ships

    DTIC Science & Technology

    2015-06-24

    developed one-dimensional partial differen- tial equation models that simulate time-dependent hy- drodynamics and heat transport in a piping network...Thermal zone extents. 2) Piping path and diameter. 3) Specifications and locations of chillers, heat ex- changers, pumps and valves. The framework of the... pipes and provides boundary conditions for the end of the connecting pipes . Pumps, valves, bends and heat exchangers are such components. These

  3. Pipe inspection using the pipe crawler. Innovative technology summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-05-01

    The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in rollmore » off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned.« less

  4. Space Shuttle RCS Oxidizer Leak Repair for STS-26

    NASA Technical Reports Server (NTRS)

    Delventhal, R. A.; Faget, N. M.

    1989-01-01

    Following propellant loading of the Space Shuttle's reaction control system (RCS) for mission STS 26, an oxidizer leak was detected in the left orbital maneuvering system (OMS) pod, where the RCS is located. Subsequent investigation determined that the leak was isolated at a mechanical Dynatube fitting near the RCS nitrogen tetroxide tank. An intense effort was initiated to design, fabricate, and qualify a sealing device to stop the oxidizer leak externally so that the Space Shuttle launch could proceed. It was discovered that sealing devices called clamshells were widely used throughout the petrochemical and power generation industries to stop leaks developed in large diameter pipes which carry steam or other hazardous fluids. These clamshells are available in different diameters and strengths and are placed around the pipe at the location of the leak. A sealing compound is then injected under high pressure into the clamshell to stop the leak. This technology was scaled down and applied to the problem of stopping the leak on the Orbiter, which was on a half-inch diameter line in a nearly inaccessible location. Many obstacles had to be overcome such as determining that the sealing material would be compatible with the nitrogen tetroxide and ensuring that the clamshell would actually fit around the Dynatube fitting without interfering with other lines which were in close proximity. The effort at the NASA Johnson Space Center included materials compatibility testing of several sealants, design of a clamshell to fit in the confined compartment, and manufacture and qualification of the flight hardware. A clamshell was successfully placed around the Dynatube fitting on the Orbiter and the oxidizer leak was terminated. Then it was decided to apply this technology further and design clamshells for other mechanical fittings onboard the Orbiter and develop sealing compounds which will be compatible with fuels such as monomethyl hydrazine (MMH). The potential exists for using this type of sealing device in numerous other applications throughout the aerospace industry.

  5. Effects of weld defects at root on rotating bending fatigue strength of small diameter socket welded pipe joints

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Higuchi, Makoto; Nakagawa, Akira; Chujo, Noriyuki

    1996-12-01

    Rotating bending fatigue tests were conducted on socket welded joints of a nominal diameter 20 mm, and effects of root defect and other various factors, including post-weld heat treatment (PWHT), pipe wall thickness, and socket wall thickness, were investigated. The socket joints exhibited, in the rotating bending fatigue mode, fatigue strengths that were markedly lower than the same 20 mm diameter joints in four-point bending fatigue. Also, where the latter specimens failed always at the toe, root-failures occurred in rotating bending fatigue. When PWHT`d, however, the fatigue strength showed a remarkable improvement, while the failure site reverted to toe. Thickermore » pipe walls and socket walls gave rise to higher fatigue strength. A formula relating the size of root defects to the fatigue strength reduction has been proposed.« less

  6. Comparative Investigation and Operational Performance Characteristics of a Wick Assisted and Axially Square Grooved Heat Pipe

    NASA Astrophysics Data System (ADS)

    Naik, Rudra, Dr.; Rama Narasihma, K., Dr.; Anikivi, Atmanand

    2018-04-01

    The present work reported here involves the experimental investigation and performance evaluation of wick assisted and axially square grooved heat pipes of outer diameter 8mm, inner diameter 4mm with a length of 150mm.The objective of this work is to design, fabricate and test the heat pipes with and without an axial square groove for horizontal and gravity assisted conditions. The performance of the heat pipes was measured in terms of thermal resistance and heat transfer coefficients. In the present investigation four different working fluids were chosen namely acetone, ethanol, methanol and distilled water. Experiments were conducted by varying the heat load from 2 W to 10 W for different fill charge ratios in the range of 25% to 75% of evaporator volume for wick assisted heat pipe and 8 W to 18 W for axially square grooved heat pipe. From the experiments, it was found that there is a steady increase in temperature with the increase in heat input. The overall heat transfer coefficient was found to increase with the increase heat load for wick assisted heat pipe. In case of axially square grooved heat pipe, an attempt was made to experiment the heat pipe in different orientations. The maximum heat transfer coefficient of 7000 W/m2 °C is found for Acetone at 180° orientation.

  7. 33 CFR Appendix A to Part 155 - Specifications for Shore Connection

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of this part] Item Description Dimension 1 Outside diameter 215 mm. (8 in.). 2 Inside diameter According to pipe outside diameter. 3 Bolt circle diameter 183 mm. (7 3/16 in.). 4 Slots in flange 6 holes 22 mm. (7/8 in.) in diameter shall be equidistantly placed on a bolt circle of the above diameter...

  8. 33 CFR Appendix A to Part 155 - Specifications for Shore Connection

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of this part] Item Description Dimension 1 Outside diameter 215 mm. (8 in.). 2 Inside diameter According to pipe outside diameter. 3 Bolt circle diameter 183 mm. (7 3/16 in.). 4 Slots in flange 6 holes 22 mm. (7/8 in.) in diameter shall be equidistantly placed on a bolt circle of the above diameter...

  9. 33 CFR Appendix A to Part 155 - Specifications for Shore Connection

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of this part] Item Description Dimension 1 Outside diameter 215 mm. (8 in.). 2 Inside diameter According to pipe outside diameter. 3 Bolt circle diameter 183 mm. (7 3/16 in.). 4 Slots in flange 6 holes 22 mm. (7/8 in.) in diameter shall be equidistantly placed on a bolt circle of the above diameter...

  10. 33 CFR Appendix A to Part 155 - Specifications for Shore Connection

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of this part] Item Description Dimension 1 Outside diameter 215 mm. (8 in.). 2 Inside diameter According to pipe outside diameter. 3 Bolt circle diameter 183 mm. (7 3/16 in.). 4 Slots in flange 6 holes 22 mm. (7/8 in.) in diameter shall be equidistantly placed on a bolt circle of the above diameter...

  11. Flow and evaporation in single micrometer and nanometer scale pipes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Velasco, A. E.; Yang, C.; Siwy, Z. S.

    2014-07-21

    We report measurements of pressure driven flow of fluids entering vacuum through a single pipe of micrometer or nanometer scale diameter. Nanopores were fabricated by etching a single ion track in polymer or mica foils. A calibrated mass spectrometer was used to measure the flow rates of nitrogen and helium through pipes with diameter ranging from 10 μm to 31 nm. The flow of gaseous and liquid nitrogen was studied near 77 K, while the flow of helium was studied from the lambda point (2.18 K) to above the critical point (5.2 K). Flow rates were controlled by changing the pressure drop across the pipemore » in the range 0–31 atm. When the pressure in the pipe reached the saturated vapor pressure, an abrupt flow transition was observed. A simple viscous flow model is used to determine the position of the liquid/vapor interface in the pipe. The observed mass flow rates are consistent with no slip boundary conditions.« less

  12. 77 FR 21968 - Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe From the People's Republic of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... countervailing duty order on seamless carbon and alloy steel standard, line, and pressure pipe from the People's... administrative review of the countervailing duty order on seamless carbon and alloy steel standard, line, and... Making Co., Ltd., Wuxi Seamless Special Pipe Co., Ltd., Wuxi Sifang Steel Tube Co., Ltd., Wuxi Zhenda...

  13. Response of reinforced concrete and corrugated steel pipes to surface load

    NASA Astrophysics Data System (ADS)

    Lay, Geoff R.

    Full-scale simulated live load tests were conducted in a controlled laboratory setting using a single-axle frame on 600-mm-inner-diameter reinforced concrete pipe (RCP) and corrugated steel pipe (CSP) when buried in dense, well-graded sand and gravel. Measurements of the RCP at nominal and working forces and beyond are reported for 0.3, 0.6 and 0.9 m of soil cover above the pipe crown. The RCP experienced no cracking when buried at 0.3 m under nominal and working CL-625 and CL-800 single-axle design loads. At these loads, the vertical contraction of the pipe diameter was less than 0.08 and 0.10 mm and the largest tensile strains in the pipe were 75 and 100 muepsilon (50-60% of the cracking strain), respectively. A 0.15 (+/-0.05)-mm-wide axial crack developed at the inner crown in the presence of a 6 kNm/m circumferential bending moment (70% of the theoretical ultimate moment capacity) at the fully factored CL-625 load. This crack did not propagate or widen from 3 series of cyclic load-unload tests. At 1300 kN of applied load the change in pipe diameter was less than 3.5 mm. Increasing soil cover from 0.3 to 0.6 to 0.9 m reduced the circumferential crown bending moment from 6.0 to 3.9 to 2.1 kNm/m, respectively, at 400 kN of axle load. A 1.6- and a 2.8-mm-thick CSP were also subjected to axle loading. No yielding or limit states occurred in the 1.6-mm-thick CSP when buried 0.9-m-deep. However, at 0.6 m of cover a 300 kN axle load caused local yielding at the pipe crown. Increasing soil cover from 0.6 to 0.9 m decreased the vertical diameter change from -3.0 to -1.2 mm and the crown bending moment from 0.7 to 0.2 kNm/m (75% and 20% of the yield moment), respectively, at a 250 kN axle load. Deflections of the thicker CSP were less than the thinner pipe below the CL-625 single-axle load, however further increases in applied load produced a greater response in the thicker pipe, likely due to a haunch support issue. Shallow axle loading produced a greater 3-dimensional response and a larger bending effect in both CSPs.

  14. 78 FR 72877 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ....m. ET 12/4/13. Docket Numbers: RP14-203-000. Applicants: Chandeleur Pipe Line Company. Description: Chandeleur Pipe Line Company's Fuel and Line Loss Allowance Calculation for 2013. Filed Date: 11/22/13...

  15. Construction and 1st Experiment of the 500-meter and 1000-meter DC Superconducting Power Cable in Ishikari

    NASA Astrophysics Data System (ADS)

    Yamaguchi, S.; Ivanov, Y.; Watanabe, H.; Chikumoto, N.; Koshiduka, H.; Hayashi, K.; Sawamura, T.

    Ishikari project constructs two lines. The length of the Line 1 is 500 m, and connects the photovoltaic cell to the internet-data center. The other line is 1 km length, and it is a test facility and called Line 2. The structures of the cable systems are not same to test their performance. The construction was started from 2014 in the field, the Line 1 was completed in May 2015, and it was cooled down and do the current experiment, and warmed up. The Line 2 is almost complete in October 2015. It will be tested in November and December, 2015. In order to reduce the stress of the cable induced by the thermal expansion and contraction, we adopted the way of the helical deformation of the cable. The force of the cable is reduced to 1/3 of an usual cable test. Because the cryogenic pipes are welded in the field and we cannot use the baking of the vacuum chamber of the cryogenic pipe, a new vacuum pumping method was proposed and tested for the cryogenic pipe. Since the straight pipes are used to compose the cryogenic pipe, the pressure drop of the circulation would be 1/100 of the corrugated pipe in the present condition, and it is suitable for longer cable system. The heat leak of the cryogenic pipe is ∼1.4W/m including the cable pipe's and the return pipe's. The heat leak of the current lead is ∼30W/kA in the test bench. Finally the current of 6kA/3 sec and the current of 5kA/15 min were achieved in Line 1. The reduction of heat leak will be a major subject of the longer cable system. The cost of the construction will be almost twice higher than that of the copper and aluminum over-head line with the iron tower in the present Japan. The cost construction of the over-head line is an average value, and depends on the newspaper.

  16. How partial nitrification could improve reclaimed wastewater transport in long pipes.

    PubMed

    Delgado, S; Alvarez, M; Rodríguez-Gómez, L E; Elmaleh, S; Aguiar, E

    2001-01-01

    Reclaimed wastewater transport is studied in a concrete-lined cast iron pipe, where a nitrification-denitrification process occurs. The pipe is part of the Reuse System of Reclaimed Wastewater of South Tenerife (Spain), 0.6 m in diameter and 61 km long. In order to improve wastewater quality, at 10 km from the inlet there is injection of fresh water saturated in dissolved oxygen (DO), after which a fast nitrification process usually appears (less than two hours of space time). The amount of oxidized nitrogen compounds produced varies between 0.8 and 4.4 mg/l NOx(-)-N. When DO has disappeared, a denitrification process begins. The removal of nitrite is complete at the end of the pipe, whereas the nitrate does not disappear completely, leaving a concentration of about 0.4-0.5 mg/l. For a COD/NOx(-)-N ratio higher than 5, a first order nitrification rate in NOx(-)-N has resulted, with the constant k20 = 0.079 h-1, for a NOx(-)-N concentration range of 0.8-4.4 mg/l. Finally the following temperature dependency for the first order denitrification rate constant has been found: k = k20 x 1 x 15T-20. Although nitrogen could be used as nutrient in the agricultural reuse, its removal from reclaimed wastewater could be useful in order to diminish the chlorine needs for reclaimed wastewater disinfection.

  17. Flexible ocean upwelling pipe

    DOEpatents

    Person, Abraham

    1980-01-01

    In an ocean thermal energy conversion facility, a cold water riser pipe is releasably supported at its upper end by the hull of the floating facility. The pipe is substantially vertical and has its lower end far below the hull above the ocean floor. The pipe is defined essentially entirely of a material which has a modulus of elasticity substantially less than that of steel, e.g., high density polyethylene, so that the pipe is flexible and compliant to rather than resistant to applied bending moments. The position of the lower end of the pipe relative to the hull is stabilized by a weight suspended below the lower end of the pipe on a flexible line. The pipe, apart from the weight, is positively buoyant. If support of the upper end of the pipe is released, the pipe sinks to the ocean floor, but is not damaged as the length of the line between the pipe and the weight is sufficient to allow the buoyant pipe to come to a stop within the line length after the weight contacts the ocean floor, and thereafter to float submerged above the ocean floor while moored to the ocean floor by the weight. The upper end of the pipe, while supported by the hull, communicates to a sump in the hull in which the water level is maintained below the ambient water level. The sump volume is sufficient to keep the pipe full during heaving of the hull, thereby preventing collapse of the pipe.

  18. A new debris sensor based on dual excitation sources for online debris monitoring

    NASA Astrophysics Data System (ADS)

    Hong, Wei; Wang, Shaoping; Tomovic, Mileta M.; Liu, Haokuo; Wang, Xingjian

    2015-09-01

    Mechanical systems could be severely damaged by loose debris generated through wear processes between contact surfaces. Hence, debris detection is necessary for effective fault diagnosis, life prediction, and prevention of catastrophic failures. This paper presents a new in-line debris sensor for hydraulic systems based on dual excitation sources. The proposed sensor makes magnetic lines more concentrated while at the same time improving magnetic field uniformity. As a result the sensor has higher sensitivity and improved precision. This paper develops the sensor model, discusses sensor structural features, and introduces a measurement method for debris size identification. Finally, experimental verification is presented indicating that that the sensor can effectively detect 81 μm (cube) or larger particles in 12 mm outside diameter (OD) organic glass pipe.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pallesen, T.R.; Braestrup, M.W.; Jorgensen, O.

    Development of Danish North Sea hydrocarbon resources includes the 17-km Rolf pipeline installed in 1985. This one consists of an insulated 8-in. two-phase flow product line with a 3-in. piggyback gas lift line. A practical solution to design of this insulated pipeline, including the small diameter, piggyback injection line was corrosion coating of fusion bonded epoxy (FBE) and polyethylene (PE) sleeve pipe. The insulation design prevents hydrate formation under the most conservative flow regime during gas lift production. Also, the required minimum flow rate during the initial natural lift period is well below the value anticipiated at the initiation ofmore » gas lift. The weight coating design ensures stability on the seabed during the summer months only; thus trenching was required during the same installation season. Installation of insulated flowlines serving marginal fields is a significant feature of North Sea hydrocarbon development projects. The Skjold field is connected to Gorm by a 6-in., two-phase-flow line. The 11-km line was installed in 1982 as the first insulated pipeline in the North Sea. The Rolf field, located 17 km west of Gorm, went on stream Jan. 2. The development includes an unmanned wellhead platform and an insulated, two-phase-flow pipeline to the Gorm E riser platform. After separation on the Gorm C process platform, the oil and condensate are transported to shore through the 20-in. oil pipeline, and the natural gas is piped to Tyra for transmission through the 30-in. gas pipeline. Oil production at Rolf is assisted by the injection of lift gas, transported from Gorm through a 3-in. pipeline, installed piggyback on the insulated 8-in. product line. The seabed is smooth and sandy, the water depth varying between 33.7 m (110.5 ft) at Rolf and 39.1 m (128 ft) at Gorm.« less

  20. A study on fatigue strength reduction factor for small diameter socket welded pipe joints

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Higuchi, Makoto; Nakagawa, Akira; Hayashi, Makoto

    1996-12-01

    Factors that may exert influence on the fatigue strength of small diameter socket welded joints of nominal diameter in the 20--50 mm range have been investigated by the fully reversed four-point bending fatigue test with the material, diameter, pipe schedule, throat depth, bead shape, slip-on gap, and root defect as the testing parameters. The fatigue strength of socket joints depended acutely on the diameter. When the diameter is large, the fatigue strength tended to be low and the fracture is of the root-failure mode; when it is small, on the other hand, the fatigue strength is high and the fracturemore » is of the toe-failure mode. Stainless steel proved to be superior to carbon steel; it gave rise to 1.37 times the fatigue strength of the latter for socket joints of nominal diameter 50 mm; the fatigue strength reduction factor determined at 10{sup 7} cycles with respect to the fatigue strength of smooth base metal in the fully reversed fatigue was about 4 for stainless steel and about 5 for carbon steel. The fatigue strength was higher, the larger the Sche number (i.e., the thicker the pipe wall); it was improved markedly by placing one final refinement pass on the toe or by eliminating the slip-on gap. An empirical formula relating the size of the root defect to the fatigue strength reduction has been proposed.« less

  1. Pressure loss in elbow pipes of unplasticized polyvinyl chloride.

    PubMed

    Iwasaki, T; Ojima, J

    1996-01-01

    In the ductwork of local exhaust systems, 90 degrees elbow pipes (JIS K 6739) are commonly used to alter the direction of airflow; thus, are important components of polyvinyl chloride (PVC) ducts. Pressure loss in 90 degrees PVC elbow pipes was investigated by measuring static pressure, and the characteristics of airflow was determined. First, a linear decrease in static pressure was observed at points of the downstream side beyond a distance of 10 times the diameter (10d) from the flanged round opening of the smooth VU ducts (JIS K6741). The linear decrease was also observed at points of the downstream side located at distances of greater than 30d from the elbow pipe. Coefficients of loss in the PVC elbow pipes were found to be constant for the Reynolds numbers ranging from 3.38 x 10(4) to 5.96 x 10(5) for all diameters examined, and a chart of pressure loss was constructed with these coefficients. The coefficients of loss in PVC elbow pipes were not equivalent to those of metal stamped elbows for any R/d. However, the differences in the coefficients between the metal stamped elbow and the PVC elbow were smaller with larger R/d values.

  2. Study of Strain-Stress Behavior of Non-Pressure Reinforced Concrete Pipes Used in Road Building

    NASA Astrophysics Data System (ADS)

    Rakitin, B. A.; Pogorelov, S. N.; Kolmogorova, A. O.

    2017-11-01

    The article contains the results of the full-scale tests performed for special road products - large-diameter non-pressure concrete pipes reinforced with a single space cylindrical frame manufactured with the technology of high-frequency vertical vibration molding with an immediate demolding. The authors studied the change in the strain-stress behavior of reinforced concrete pipes for underground pipeline laying depending on their laying depth in the trench and the transport load considering the properties of the surrounding ground mass. The strain-stress behavior of the reinforced concrete pipes was evaluated using the strain-gauge method based on the application of active resistance strain gauges. Based on the completed research, the authors made a conclusion on the applicability of a single space frame for reinforcement of large-diameter non-pressure concrete pipes instead of a double frame which allows one to significantly reduce the metal consumption for the production of one item. As a result of the full-scale tests of reinforced concrete pipes manufactured by vertical vibration molding, the authors obtained new data on the deformation of a pipeline cross-section depending on the placement of the transport load with regard to the axis.

  3. Laboratory exercises on oscillation modes of pipes

    NASA Astrophysics Data System (ADS)

    Haeberli, Willy

    2009-03-01

    This paper describes an improved lab setup to study the vibrations of air columns in pipes. Features of the setup include transparent pipes which reveal the position of a movable microphone inside the pipe; excitation of pipe modes with a miniature microphone placed to allow access to the microphone stem for open, closed, or conical pipes; and sound insulation to avoid interference between different setups in a student lab. The suggested experiments on the modes of open, closed, and conical pipes, the transient response of a pipe, and the effect of pipe diameter are suitable for introductory physics laboratories, including laboratories for nonscience majors and music students, and for more advanced undergraduate laboratories. For honors students or for advanced laboratory exercises, the quantitative relation between the resonance width and damping time constant is of interest.

  4. 10. VIEW OF PIPING. THE BUILDING HAD OVER 700 MILES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. VIEW OF PIPING. THE BUILDING HAD OVER 700 MILES OF PIPING, OF WHICH 70 MILES WERE PLUTONIUM PROCESSING LINES. THESE PROCESS LINES RAN THROUGH WALLS AND TRAVERSED SEVERAL FLOORS. (6/29/78) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  5. Primer on Condition Curves for Water Mains

    EPA Science Inventory

    ABSTRACT The development of economical tools to prioritize pipe renewal based upon structural condition and remaining asset life is essential to effectively manage water infrastructure assets for both large and small diameter pipes. One tool that may facilitate asset management...

  6. Feed gas contaminant control in ion transport membrane systems

    DOEpatents

    Carolan, Michael Francis [Allentown, PA; Minford, Eric [Laurys Station, PA; Waldron, William Emil [Whitehall, PA

    2009-07-07

    Ion transport membrane oxidation system comprising an enclosure having an interior and an interior surface, inlet piping having an internal surface and adapted to introduce a heated feed gas into the interior of the enclosure, and outlet piping adapted to withdraw a product gas from the interior of the enclosure; one or more planar ion transport membrane modules disposed in the interior of the enclosure, each membrane module comprising mixed metal oxide material; and a preheater adapted to heat a feed gas to provide the heated feed gas to the inlet piping, wherein the preheater comprises an interior surface. Any of the interior surfaces of the enclosure, the inlet piping, and the preheater may be lined with a copper-containing metal lining. Alternatively, any of the interior surfaces of the inlet piping and the preheater may be lined with a copper-containing metal lining and the enclosure may comprise copper.

  7. Shrinking plastic tubing and nonstandard diameters

    NASA Technical Reports Server (NTRS)

    Ruiz, W. V.; Thatcher, C. S.

    1980-01-01

    Process allows larger-than-normal postshrink diameters without splitting. Tetrafluoroethylene tubing on mandrel is supported within hot steel pipe by several small diameter coil sections. Rising temperature of mandrel is measured via thermocouple so assembly can be removed without overshrinking (and splitting) of tubing.

  8. Eight-Year Summary of Fort Irwin, CA, Family Housing Comparison Test: Operation and Maintenance Costs of Manufactured vs. Conventionally Built Units

    DTIC Science & Technology

    1993-07-01

    Ruptured polybutylene pipe from Building 3858, Unit C 77 F20 Longitudinal hair line crack in PB pipe from Building 3802, Unit B 78 F21 Microscopic...of the 200 housing units used national standards in the unit construction which included the use of polybutylene ( PB ) piping. The piping was...in PB Pipe from Building 3802, Unit B Figure F 21: Microscopic View of Longitudinal Hair Line Crack 78 Figure F22: White Coating on Acetld Fitting

  9. Field Measurements of Heat Losses from Three Types of Heat Distribution Systems

    DTIC Science & Technology

    1991-11-01

    with the supply pipe on top of the 2.5-in.-thick mineral wool in each case. return pipe. The conduit has an outer diameter of ap- proximately 20 in...is 5-in. NPS schedule 40 steel. Each pipe is insulated with Instrumentation layout 2.5 in. of mineral wool pipe insulation. The location of the...common Only two manufacturers of mineral wool insulation conduit, trench and individual conduit sites, respec- have a product approved for use on

  10. Forensic characterization of HDPE pipes by DSC.

    PubMed

    Sajwan, Madhuri; Aggarwal, Saroj; Singh, R B

    2008-03-05

    The melting behavior of 28 high density polyethylene (HDPE) pipe samples manufactured and supplied by 13 different manufacturers in India was examined by 'differential scanning calorimetry (DSC)' to find out if this parameter could be used in differentiating between these HDPE pipe samples which are chemically the same and being manufactured by different manufacturer. The results indicate that the melting temperature may serve as the useful criteria for differentiating HDPE (i) pipe samples from different sources and (ii) samples of different diameter from the same source.

  11. Erosion of water-based fracturing fluid containing particles in a sudden contraction of horizontal pipe

    NASA Astrophysics Data System (ADS)

    Cheng, Jiarui; Cao, Yinping; Dou, Yihua; Li, Zhen

    2017-10-01

    A lab experiment was carried out to study the effects of pipe flow rate, particle concentration and pipe inner diameter ratio on proppant erosion of the reducing wall in hydraulic fracturing. The results show that the erosion rate and erosion distribution are different not only in radial direction but also in circumferential direction of the sample. The upper part of sample always has a minimum erosion rate and erosion area. Besides, the erosion rate of reducing wall is most affected by fluid flow velocity, and the erosion area is most sensitive to the change in the diameter ratio. Meanwhile, the erosion rate of reducing wall in crosslinked fracturing fluid is mainly determined by the fluid flowing state due to the high viscosity of the liquid. In general, the increase in flow velocity and diameter ratio not only cause the expansion of erosion-affected flow region in sudden contraction section, but also lead to more particles impact the wall.

  12. 49 CFR 195.207 - Transportation of pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... stress of 20 percent or more of SMYS, an operator may not use pipe having an outer diameter to wall... barge. In a pipeline operated at a hoop stress of 20 percent or more of SMYS, an operator may not use...

  13. 49 CFR 195.207 - Transportation of pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... stress of 20 percent or more of SMYS, an operator may not use pipe having an outer diameter to wall... barge. In a pipeline operated at a hoop stress of 20 percent or more of SMYS, an operator may not use...

  14. 49 CFR 195.207 - Transportation of pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... stress of 20 percent or more of SMYS, an operator may not use pipe having an outer diameter to wall... barge. In a pipeline operated at a hoop stress of 20 percent or more of SMYS, an operator may not use...

  15. 46 CFR 151.50-84 - Sulfur dioxide.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... piping or manifold that carriers cargo liquid, except vapor lines connected to a common header, and (11... must be removed and cargo transfer piping must be disconnected at the cargo tanks. After the cargo piping is disconnected, both ends of the line must be plugged or fitted with blind flanges. [CGD 80-001...

  16. Seam-weld quality of modern ERW/HFI line pipe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Groeneveld, T.P.; Barnes, C.R.

    1991-09-01

    This study was undertaken to determine whether the seam-weld quality of modern ERW (electric resistance-welded)/HFI (high-frequency induction) welded pipe has been improved and justifies more widespread use of this type of pipe in critical applications. Wider use of ERW/HFI line pipe in gas-transmission lines would be expected to reduce construction costs. Five recently produced, heavy wall pipes fabricated using high-frequency electric-resistance welding (ERW) processes to make the seam weld and one pipe fabricated using the high-frequency induction (HFI) welding process to make the seam weld were studied. Four of the pipes were Grade X-60, one was Grade X-65, and onemore » was Grade X-70. All of the pipes were produced from microalloyed, controlled-rolled steels, and the weld zones were post-weld normalized. Ultrasonic inspection of the seam welds in the six pipe sections evaluated revealed no indications of defects. The tensile properties of all of the weld zones exceeded the minimum specified yield strengths for the respective grades of pipe and all of the pipes exhibited ductile failures either in the weld zone or in the base metal. Five of the six pipes exhibited ductile failures either in the weld zone or in the base metal. Five of the six pipes exhibited relatively low 85% shear area transition temperatures and relatively high upper-shelf energy absorptions as determined with Charpy V-notch specimens. In addition, for two of the three joints of pipe for which the properties were determined at both ends of the pipe, the tensile and impact properties showed little variation from end-to-end. However, for the other joint of pipe, the impact properties varied substantially from one end to the other.« less

  17. Decoupling pipeline influences in soil resistivity measurements with finite element techniques

    NASA Astrophysics Data System (ADS)

    Deo, R. N.; Azoor, R. M.; Zhang, C.; Kodikara, J. K.

    2018-03-01

    Periodic inspection of pipeline conditions is an important asset management strategy conducted by water and sewer utilities for efficient and economical operations of their assets in field. The Level 1 pipeline condition assessment involving resistivity profiling along the pipeline right-of-way is a common technique for delineating pipe sections that might be installed in highly corrosive soil environment. However, the technique can suffer from significant perturbations arising from the buried pipe itself, resulting in errors in native soil characterisation. To address this problem, a finite element model was developed to investigate the degree to which pipes of different a) diameters, b) burial depths, and c) surface conditions (bare or coated) can influence in-situ soil resistivity measurements using Wenner methods. It was found that the greatest errors can arise when conducting measurements over a bare pipe with the array aligned parallel to the pipe. Depending upon the pipe surface conditions, in-situ resistivity measurements can either be underestimated or overestimated from true soil resistivities. Following results based on simulations and decoupling equations, a guiding framework for removing pipe influences in soil resistivity measurements were developed that can be easily used to perform corrections on measurements. The equations require simple a-prior information on the pipe diameter, burial depth, surface condition, and the array length and orientation used. Findings from this study have immediate application and is envisaged to be useful for critical civil infrastructure monitoring and assessment.

  18. Comparison of carbon footprints of steel versus concrete pipelines for water transmission.

    PubMed

    Chilana, Lalit; Bhatt, Arpita H; Najafi, Mohammad; Sattler, Melanie

    2016-05-01

    The global demand for water transmission and service pipelines is expected to more than double between 2012 and 2022. This study compared the carbon footprint of the two most common materials used for large-diameter water transmission pipelines, steel pipe (SP) and prestressed concrete cylinder pipe (PCCP). A planned water transmission pipeline in Texas was used as a case study. Four life-cycle phases for each material were considered: material production and pipeline fabrication, pipe transportation to the job site, pipe installation in the trench, and operation of the pipeline. In each phase, the energy consumed and the CO2-equivalent emissions were quantified. It was found that pipe manufacturing consumed a large amount of energy, and thus contributed more than 90% of life cycle carbon emissions for both kinds of pipe. Steel pipe had 64% larger CO2-eq emissions from manufacturing compared to PCCP. For the transportation phase, PCCP consumed more fuel due to its heavy weight, and therefore had larger CO2-eq emissions. Fuel consumption by construction equipment for installation of pipe was found to be similar for steel pipe and PCCP. Overall, steel had a 32% larger footprint due to greater energy used during manufacturing. This study compared the carbon footprint of two large-diameter water transmission pipeline materials, steel and prestressed concrete cylinder, considering four life-cycle phases for each. The study provides information that project managers can incorporate into their decision-making process concerning pipeline materials. It also provides information concerning the most important phases of the pipeline life cycle to target for emission reductions.

  19. Fluid Transient Analysis during Priming of Evacuated Line

    NASA Technical Reports Server (NTRS)

    Bandyopadhyay, Alak; Majumdar, Alok K.; Holt, Kimberley

    2017-01-01

    Water hammer analysis in pipe lines, in particularly during priming into evacuated lines is important for the design of spacecraft and other in-space application. In the current study, a finite volume network flow analysis code is used for modeling three different geometrical configurations: the first two being straight pipe, one with atmospheric air and other with evacuated line, and the third case is a representation of a complex flow network system. The numerical results show very good agreement qualitatively and quantitatively with measured data available in the literature. The peak pressure and impact time in case of straight pipe priming in evacuated line shows excellent agreement.

  20. 49 CFR 192.719 - Transmission lines: Testing of repairs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... pipe before it is installed. (b) Testing of repairs made by welding. Each repair made by welding in... 49 Transportation 3 2010-10-01 2010-10-01 false Transmission lines: Testing of repairs. 192.719... Transmission lines: Testing of repairs. (a) Testing of replacement pipe. If a segment of transmission line is...

  1. 49 CFR 192.487 - Remedial measures: Distribution lines other than cast iron or ductile iron lines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... STANDARDS Requirements for Corrosion Control § 192.487 Remedial measures: Distribution lines other than cast iron or ductile iron lines. (a) General corrosion. Except for cast iron or ductile iron pipe, each... engineering tests and analyses show can permanently restore the serviceability of the pipe. Corrosion pitting...

  2. 49 CFR 192.487 - Remedial measures: Distribution lines other than cast iron or ductile iron lines.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... STANDARDS Requirements for Corrosion Control § 192.487 Remedial measures: Distribution lines other than cast iron or ductile iron lines. (a) General corrosion. Except for cast iron or ductile iron pipe, each... engineering tests and analyses show can permanently restore the serviceability of the pipe. Corrosion pitting...

  3. 49 CFR 192.487 - Remedial measures: Distribution lines other than cast iron or ductile iron lines.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... STANDARDS Requirements for Corrosion Control § 192.487 Remedial measures: Distribution lines other than cast iron or ductile iron lines. (a) General corrosion. Except for cast iron or ductile iron pipe, each... engineering tests and analyses show can permanently restore the serviceability of the pipe. Corrosion pitting...

  4. 49 CFR 192.487 - Remedial measures: Distribution lines other than cast iron or ductile iron lines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... STANDARDS Requirements for Corrosion Control § 192.487 Remedial measures: Distribution lines other than cast iron or ductile iron lines. (a) General corrosion. Except for cast iron or ductile iron pipe, each... engineering tests and analyses show can permanently restore the serviceability of the pipe. Corrosion pitting...

  5. Design characteristics of a heat pipe test chamber

    NASA Technical Reports Server (NTRS)

    Baker, Karl W.; Jang, J. Hoon; Yu, Juin S.

    1992-01-01

    LeRC has designed a heat pipe test facility which will be used to provide data for validating heat pipe computer codes. A heat pipe test chamber that uses helium gas for enhancing heat transfer was investigated. The conceptual design employs the technique of guarded heating and guarded cooling to facilitate accurate measurements of heat transfer rates to the evaporator and from the condenser. The design parameters are selected for a baseline heat pipe made of stainless steel with an inner diameter of 38.10 mm and a wall thickness of 1.016 mm. The heat pipe operates at a design temperature of 1000 K with an evaporator radial heat flux of 53 W/sq. cm.

  6. Sensory aspects of drinking water in contact with epoxy lined copper pipe.

    PubMed

    Heim, T H; Dietrich, A M

    2007-01-01

    Pipe relining via in situ epoxy lining is used to remediate corroded plumbing or distribution systems. This investigation examined the effects on odour, TOC, THM formation and disinfectant demand in water exposed to epoxy-lined copper pipes used for home plumbing. The study was conducted in accordance with the Utility Quick Test, a migration/leaching method for utilities to conduct sensory analysis of materials in contact with drinking water. The test was performed using water with no disinfectant and levels of chlorine and monochloramines representative of those found in the distribution system. Panelists repeatedly and consistently described a "plastic/adhesive/putty" odour in the water from the pipes. The odour intensity remained relatively constant for each of two subsequent flushes. Water samples stored in the epoxy-lined pipes showed a significant increase in the leaching of organic compounds (as TOC), and this TOC was demonstrated to react with free chlorine to form trichloromethane. Water stored in the pipes also showed a marked increase in disinfectant demand relative to the water stored in glass control flasks. A study conducted at a full scale installation at an apartment demonstrated that after installation and regular use, the epoxy lining did not yield detectable differences in water quality.

  7. Thermal Performance of High Temperature Titanium-Water Heat Pipes by Multiple Heat Pipe Manufacturers

    NASA Technical Reports Server (NTRS)

    Sanzi, James L.

    2007-01-01

    Titanium-water heat pipes are being investigated for use in heat rejection systems for lunar and Mars fission surface power systems. Heat pipes provide an efficient and reliable means to transfer heat to a radiator heat rejection system. NASA Glenn Research Center requisitioned nine titanium water heat pipes from three vendors. Each vendor supplied three heat pipes 1.25 cm diameter by 1.1 meter long with each vendor selecting a different wick design. Each of the three heat pipes is slightly different in construction. Additional specifications for the heat pipes included 500 K nominal operating temperature, light weight, and freeze tolerance. The heat pipes were performance tested gravity-aided, in the horizontal position and at elevations against gravity at 450 and 500 K. Performance of the three heat pipes is compared. The heat pipe data will be used to verify models of heat pipe radiators that will be used in future space exploration missions.

  8. Thermal Performance of High Temperature Titanium -- Water Heat Pipes by Multiple Heat Pipe Manufacturers

    NASA Technical Reports Server (NTRS)

    Sanzi, James L.

    2007-01-01

    Titanium - water heat pipes are being investigated for use in heat rejection systems for lunar and Mars fission surface power systems. Heat pipes provide an efficient and reliable means to transfer heat to a radiator heat rejection system. NASA Glenn Research Center requisitioned nine titanium water heat pipes from three vendors. Each vendor supplied three heat pipes 1.25 cm diameter by 1.1 meter long with each vendor selecting a different wick design. Each of the three heat pipes is slightly different in construction. Additional specifications for the heat pipes included 500 K nominal operating temperature, light weight, and freeze tolerance. The heat pipes were performance tested gravity-aided, in the horizontal position and at elevations against gravity at 450 K and 500 K. Performance of the three heat pipes is compared. The heat pipe data will be used to verify models of heat pipe radiators that will be used in future space exploration missions.

  9. 49 CFR 192.373 - Service lines: Cast iron and ductile iron.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Service lines: Cast iron and ductile iron. 192.373... Regulators, and Service Lines § 192.373 Service lines: Cast iron and ductile iron. (a) Cast or ductile iron... cast iron pipe or ductile iron pipe is installed for use as a service line, the part of the service...

  10. Taylor dispersion of colloidal particles in narrow channels

    NASA Astrophysics Data System (ADS)

    Sané, Jimaan; Padding, Johan T.; Louis, Ard A.

    2015-09-01

    We use a mesoscopic particle-based simulation technique to study the classic convection-diffusion problem of Taylor dispersion for colloidal discs in confined flow. When the disc diameter becomes non-negligible compared to the diameter of the pipe, there are important corrections to the original Taylor picture. For example, the colloids can flow more rapidly than the underlying fluid, and their Taylor dispersion coefficient is decreased. For narrow pipes, there are also further hydrodynamic wall effects. The long-time tails in the velocity autocorrelation functions are altered by the Poiseuille flow.

  11. Evaluation of an earth heated bridge deck.

    DOT National Transportation Integrated Search

    1984-04-01

    The design, construction, performance and analysis of the first ground heat pipe : system to heat an entire bridge deck are detailed. Each of the sixty heat pipes in : this system is comprised of a 6 em (2.4") diameter, 31 m (lOO')_long vertical grou...

  12. Durability and Reliability of Large Diameter HDPE Pipe for Water Main Applications (Web Report 4485)

    EPA Science Inventory

    Research validates HDPE as a suitable material for use in municipal piping systems, and more research may help users maximize their understanding of its durability and reliability. Overall, corrosion resistance, hydraulic efficiency, flexibility, abrasion resistance, toughness, f...

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Congram, G.E.

    When Plantation Pipe Line Co., Greensboro, NC purchased an adjacent tank farm containing six above ground steel storage tanks, the facilities had been idle for 18 months. As a result, major repairs and modifications were needed before the tanks and associated equipment could be returned to service. The main challenge, however, was to bring the 50-year old storage tanks up to operating standards as quickly and cost-effectively as possible. Varying degrees of restoration and a variety of procedures were implemented as solutions to the restoration project. Of particular concern was assuring the overall integrity of the steel tank bottoms andmore » that they were fully protected from internal and external corrosion. Work on the six newly-acquired tanks began in July 1994 and was completed in five months. Configurations ranged from 84 feet in diameter cone roof tanks with interior steel floaters to 110 in diameter tanks with open top floating roofs, to 140 feet in diameter cone roof tanks. All tanks were in different states of condition and many of the same maintenance procedures were used during restoration. This paper reviews the various renovation techniques used to restore these tanks to service.« less

  14. Visualization of various working fluids flow regimes in gravity heat pipe

    NASA Astrophysics Data System (ADS)

    Nemec, Patrik

    Heat pipe is device working with phase changes of working fluid inside hermetically closed pipe at specific pressure. The phase changes of working fluid from fluid to vapour and vice versa help heat pipe to transport high heat flux. Amount of heat flux transferred by heat pipe, of course depends on kind of working fluid. The article deal about visualization of various working fluids flow regimes in glass gravity heat pipe by high speed camera and processes casing inside during heat pipe operation. Experiment working fluid flow visualization is performed with two glass heat pipes with different inner diameter (13 mm and 22 mm) filled with water, ethanol and fluorinert FC 72. The working fluid flow visualization explains the phenomena as a working fluid boiling, nucleation of bubbles, and vapour condensation on the wall, vapour and condensate flow interaction, flow down condensate film thickness on the wall occurred during the heat pipe operation.

  15. Drag reduction of alumina nanofluid in spiral pipe with turbulent flow conditions

    NASA Astrophysics Data System (ADS)

    Yanuar, Mau, Sealtial; Waskito, Kurniawan T.; Putra, Okky A.; Hanif, Rifqi

    2017-03-01

    This study was conducted to investigate the effects of nanofluid flows through the spiral pipe on drag reduction in turbulent flow conditions. Al2O3 nanoparticles dispersed into pure water at ratio of 100 ppm, 200 ppm and 300 ppm as well as the duration of the mixing time 30 minutes, 60 minutes and 120 minutes. A circular pipe used as a comparison to spiral pipe and both are mounted horizontally. Spiral pipe ratio is P/Di 10.8 and the inner diameter of circular pipe is 3 mm. Mixing time and composition ratio of nanoparticle in basic fluid influence drag reduction results. Nanofluid flows through the test pipe with Reynolds number between 4.0 × 103 to 2.0 × 104 showed high drag reduction occurred in the spiral pipe is 38%.

  16. Conical diffuser for fuel cells

    NASA Technical Reports Server (NTRS)

    Craft, D. W.

    1976-01-01

    Diffuser is inserted into inlet manifold, producing smooth transition of flow from pipe diameter to manifold diameter. Expected pressure gradient and resulting cell-to-cell temperature gradient are reduced. Outlet manifold has nozzle insert that reduces exit losses.

  17. Structural Analysis of Pressurized Small Diameter Lines in a Random Vibration Environment

    NASA Technical Reports Server (NTRS)

    Davis, Mark; Ridnour, Andrew; Brethen, Mark

    2011-01-01

    The pressurization and propellant feed lines for the Ares 1 Upper Stage Reaction and Roll Control Systems (ReCS and RoCS) were required to be in a high g-load random vibration flight environment. The lines connected the system components and were filled with both liquid hydrazine and gaseous helium. They are considered small and varied between one fourth to one inch in diameter. The random vibration of the lines was considered to be base excitation through the mating components and mounting hardware. It was found that reducing the amount of support structure for the lines added flexibility to the system and improved the line stresses from random vibration, but caused higher stresses from the static g-loads. The locations and number of brackets were optimized by analyzing the mode shapes of the lines causing high stresses. The use of brackets that only constrain motion in the direction of concern further reduced the stresses in the lines. Finite element analysis was used to perform the analysis. The lines were pre-stressed by temperature and internal pressure with fluid and insulation included as non-structural mass. Base excitation was added to the model using Power Spectral Density (PSD) data for the expected flight loads. The random vibration and static g-load cases were combined to obtain the total stress in the lines. This approach advances the state of the art in line analysis by using FEA to predict the stresses in the lines and to optimize the entire system based on the expected flight environment. Adding flexibility to lines has been used in piping system for temperature loads, but in flight environments flexibility has been limited for the static stresses. Adding flexibility to the system in a flight environment by reducing brackets has the benefit of reducing stresses and weight

  18. Bubble Generation in a Flowing Liquid Medium and Resulting Two-Phase Flow in Microgravity

    NASA Technical Reports Server (NTRS)

    Pais, S. C.; Kamotani, Y.; Bhunia, A.; Ostrach, S.

    1999-01-01

    The present investigation reports a study of bubble generation under reduced gravity conditions, using both a co-flow and a cross-flow configuration. This study may be used in the conceptual design of a space-based thermal management system. Ensuing two-phase flow void fraction can be accurately monitored using a single nozzle gas injection system within a continuous liquid flow conduit, as utilized in the present investigation. Accurate monitoring of void fraction leads to precise control of heat and mass transfer coefficients related to a thermal management system; hence providing an efficient and highly effective means of removing heat aboard spacecraft or space stations. Our experiments are performed in parabolic flight aboard the modified DC-9 Reduced Gravity Research Aircraft at NASA Lewis Research Center, using an air-water system. For the purpose of bubble dispersion in a flowing liquid, we use both a co-flow and a cross-flow configuration. In the co-flow geometry, air is introduced through a nozzle in the same direction with the liquid flow. On the other hand, in the cross-flow configuration, air is injected perpendicular to the direction of water flow, via a nozzle protruding inside the two-phase flow conduit. Three different flow conduit (pipe) diameters are used, namely, 1.27 cm, 1.9 cm and 2.54 cm. Two different ratios of nozzle to pipe diameter (D(sub N))sup * are considered, namely (D(sub N))sup * = 0.1 and 0.2, while superficial liquid velocities are varied from 8 to 70 cm/s depending on flow conduit diameter. It is experimentally observed that by holding all other flow conditions and geometry constant, generated bubbles decrease in size with increase in superficial liquid velocity. Detached bubble diameter is shown to increase with air injection nozzle diameter. Likewise, generated bubbles grow in size with increasing pipe diameter. Along the same lines, it is shown that bubble frequency of formation increases and hence the time to detachment of a forming bubble decreases, as the superficial liquid velocity is in-creased. Furthermore, it is shown that the void fraction of the resulting two-phase flow increases with volumetric gas flow rate Q(sub d), pipe diameter and gas injection nozzle diameter, while they decrease with surrounding liquid flow. The important role played by flowing liquid in detaching bubbles in a reduced gravity environment is thus emphasized. We observe that the void fraction can be accurately controlled by using single nozzle gas injection, rather than by employing multiple port injection, since the later system gives rise to unpredictable coalescence of adjacent bubbles. It is of interest to note that empirical bubble size and corresponding void fraction are somewhat smaller for the co-flow geometry than the cross-flow configuration at similar flow conditions with similar pipe and nozzle diameters. In order to supplement the empirical data, a theoretical model is employed to study single bubble generation in the dynamic (Q(sub d) = 1 - 1000 cu cm/s) and bubbly flow regime within the framework of the co-flow configuration. This theoretical model is based on an overall force balance acting on the bubble during the two stages of generation, namely the expansion and the detachment stage. Two sets of forces, one aiding and the other inhibiting bubble detachment are identified. Under conditions of reduced gravity, gas momentum flux enhances, while the surface tension force at the air injection nozzle tip inhibits bubble detachment. In parallel, liquid drag and inertia can act as both attaching and detaching forces, depending on the relative velocity of the bubble with respect to the surrounding liquid. Predictions of the theoretical model compare well with our experimental results. However, at higher superficial liquid velocities, as the bubble loses its spherical form, empirical bubble size no longer matches the theoretical predictions. In summary, we have developed a combined experimental and theoretical work, which describes the complex process of bubble generation and resulting two-phase flow in a microgravity environment. Results of the present study can be used in a wide range of space-based applications, such as thermal energy and power generation, propulsion, cryogenic storage and long duration life support systems, necessary for programs such as NASA's Human Exploration for the Development of Space (HEDS).

  19. Utilizing Snap-Tite slip line pipe as a direct burial cross pipe, construction and first interim report, October, 2007.

    DOT National Transportation Integrated Search

    2007-10-01

    The Maine Department of Transportation uses reinforced concrete, polymer coated corrugated metal, : corrugated aluminum or corrugated polyethylene for highway cross pipes. Design life for cross pipe is 50 : plus years. Repair of failed cross pipes in...

  20. Flexible ultrasonic transducers for structural health monitoring of metals and composites

    NASA Astrophysics Data System (ADS)

    Kobayashi, M.; Wu, K.-T.; Shih, J.-L.; Jen, C.-K.; Kruger, S. E.

    2010-03-01

    Flexible ultrasonic transducers (FUTs) which have the on-site installation capability are presented for the non-destructive evaluation (NDE) and structural health monitoring (SHM) purposes. These FUTs consist of 75 μm thick titanium membrane, thick (> 70 μm) thick piezoelectric lead-zirconate-titanate (PZT) composite (PZT-c) films and thin (< 5 μm) thick top electrodes. The PZT-c films are made by a sol-gel spray technique. Such FUT has been glued onto a steel pipe of 101 mm in diameter and 4.5 mm in wall thickness and operated up to 200°C. The glue served as high temperature ultrasonic couplant between the FUT and the external surface of the pipe. The estimated pipe thickness measurement accuracy at 200°C is 34 μm. FUTs also were glued onto the end edge of 2 mm thick aluminum (Al) plates to generate and receive predominantly symmetrical and shear-horizontal (SH) plate acoustic waves (PAWs) to detect simulated line defects at temperature up to 100°C. FUTs glued onto a graphite/epoxy (Gr/Ep) composite are also used for the detection of artificial disbonds. An induction type non-contact method for the evaluation of Al plates and Gr/Ep composites using FUTs is also demonstrated.

  1. MEASURING AND MODELING DISINFECTION WALL DEMAND IN METALLIC PIPES

    EPA Science Inventory

    A field test procedure was developed and implemented in Detroit to estimate chlorine loss due to wall demand in older 6" (152 mm) and 8" (203 mm) diameter, unlined cast iron pipes. The test results produced extremely high wall reaction rate coefficients that increased significan...

  2. Design, fabrication and test of a hydrogen heat pipe. [extruding and grooving 6063-T6 aluminum tubes for cryogenic heat pipes

    NASA Technical Reports Server (NTRS)

    Alario, J.

    1979-01-01

    Re-entrant groove technology was extended to hydrogen heat pipes. Parametric analyses are presented which optimize the theoretical design while considering the limitations of state-of-the-art extrusion technology. The 6063-T6 aluminum extrusion is 14.6 mm OD with a wall thickness of 1.66 mm and contains 20 axial grooves which surround a central 9.3 mm diameter vapor core. Each axial groove is 0.775 mm diameter with a 0.33 mm opening. An excess vapor reservoir is provided at the evaporator to minimize the pressure containment hazard during ambient storage. Modifications to the basic re-entrant groove profile resulted in improved overall performance. While the maximum heat transport capacity decreased slightly to 103 w-m the static wicking height increased markedly to 4.5 cm. The heat pipe became operational between 20 and 30 K after a cooldown from 77 K without any difficulty. Steady state performance data taken over a 19 to 23 K temperature range indicated: (1) maximum heat transport capacity of 5.4 w-m; (2) static wicking height of 1.42 cm; and (3) overall heat pipe conductance of 1.7 watts/deg C.

  3. REDUCED COST SEWER PIPE RELINING USING ULTRASONIC TAPE LAMINATION - PHASE I

    EPA Science Inventory

    Water and sewerage pipe rehabilitation represents a critical and expensive infrastructure issue. Although systems currently are available for relining existing pipes and constructing new lined pipes, the proposed advanced technology will improve the quality while substantia...

  4. A review of pipe and bamboo artificial refugia as sampling tools in anuran studies

    USGS Publications Warehouse

    Glorioso, Brad M.; Waddle, J. Hardin

    2014-01-01

    Artificial pipe-like refugia have been used for more than 40 years in anuran studies, and have captured 28 species, primarily (82%) hylid treefrogs. Early pipe-like refugia were made using cut pieces of bamboo in the tropical forests of Puerto Rico, but most recent studies have used synthetic pipes and have occurred primarily in the southeastern United States. Characteristics of artificial refugia (e.g., color, length, and diameter), and their placement in the environment have varied greatly among studies, making comparisons difficult. Here, we summarize and evaluate different pipe designs and placement, address potential concerns when using artificial pipe-like refugia, and suggest studies necessary to better interpret the data gained from this technique in anuran studies.

  5. Extendable pipe crawler

    DOEpatents

    Hapstack, Mark

    1991-01-01

    A pipe crawler having a front leg assembly and a back leg assembly connected together by two air cylinders, each leg assembly having four extendable legs and a pair of actuators for sliding the extendable legs radially outward to increase the range of the legs when the pipe crawler enters a section of a pipe having a larger diameter. The crawler crawls by "inchworm"-like motion, the front leg assembly and back leg assembly alternately engaging and disengaging the wall of the pipe to hold the pipe crawler as the air cylinders alternately advance the front leg assembly and bring up the rear leg assembly. The pair of actuators of each leg assembly are parallel, adjacent and opposing acting so that each slides two adjacent extendable legs radially outward.

  6. 75 FR 76713 - Combined Notice of Filings No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-09

    ... Numbers: RP11-1540-000. Applicants: Chandeleur Pipe Line Company. Description: Chandeleur Pipe Line Company submits tariff filing per 154.403(d)(2): Chandeleur FLLA to be effective 1/1/2011. Filed Date: 11...

  7. CAP/WAP-based correlations for estimating the static axial capacity of open-ended steel pipe piles in Alaska.

    DOT National Transportation Integrated Search

    2012-12-01

    CAPWAP analyses of open-ended steel pipe piles at 32 bridge sites in Alaska have been compiled with geotechnical and construction : information for 12- to 48-inch diameter piles embedded in predominantly cohesionless soils to maximum depths of 161-fe...

  8. Electrical transmission line diametrical retainer

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  9. PHOS Experiment: Thermal Response of a Large Diameter Pulsating Heat Pipe on Board REXUS-18 Rocket

    NASA Astrophysics Data System (ADS)

    Creatini, F.; Guidi, G. M.; Belfi, F.; Cicero, G.; Fioriti, D.; Di Prizio, D.; Piacquadio, S.; Becatti, G.; Orlandini, G.; Frigerio, A.; Fontanesi, S.; Nannipieri, P.; Rognini, M.; Morganti, N.; Filippeschi, S.; Di Marco, P.; Fanucci, L.; Baronti, F.; Mameli, M.; Marengo, M.; Manzoni, M.

    2015-09-01

    In the present work, the results of two Closed Loop Pulsating Heat Pipes (CLPHPs) tested on board REXUS-1 8 sounding rocket in order to get experimental data over a relatively broad reduced gravity period (about 90 s) are thoroughly discussed. The CLPHPs are partially filled with refrigerant FC-72 and have, respectively, an inner tube diameter larger (3 .0 mm) and slightly smaller (1 .6 mm) than a critical diameter defined on Earth gravity conditions. On ground, the small diameter CLPHP works as a real Pulsating Heat Pipe (PHP): the typical capillary slug flow pattern forms inside the device and the heat exchange is triggered by self-sustained thermally driven oscillations of the working fluid. Conversely, the large diameter CLPHP behaves like a two-phase thermosyphon in vertical position while does not operate in horizontal position as the working fluid stratifies within the tube and surface tension is not able to balance buoyancy. Then, the idea to test the CLPHPs under reduced gravity conditions: as soon as gravity reduces, buoyancy becomes less intense and the typical capillary slug flow pattern can also forms within a tube with a larger diameter. Moreover, this allows to increase the heat transfer rate and, consequently, to decrease the overall thermal resistance. Even though it was not possible to experience the expected reduced gravity conditions due to a failure of the yo-yo de-spin system, the thermal response to the peculiar acceleration field (hyper-gravity) experienced on board are thoroughly described.

  10. 49 CFR 192.125 - Design of copper pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Design of copper pipe. 192.125 Section 192.125... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Pipe Design § 192.125 Design of copper pipe. (a) Copper... hard drawn. (b) Copper pipe used in service lines must have wall thickness not less than that indicated...

  11. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  12. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  13. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  14. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  15. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  16. Heat Transfer Modeling of an Annular On-Line Spray Water Cooling Process for Electric-Resistance-Welded Steel Pipe

    PubMed Central

    Chen, Zejun; Han, Huiquan; Ren, Wei; Huang, Guangjie

    2015-01-01

    On-line spray water cooling (OSWC) of electric-resistance-welded (ERW) steel pipes can replace the conventional off-line heat treatment process and become an important and critical procedure. The OSWC process improves production efficiency, decreases costs, and enhances the mechanical properties of ERW steel pipe, especially the impact properties of the weld joint. In this paper, an annular OSWC process is investigated based on an experimental simulation platform that can obtain precise real-time measurements of the temperature of the pipe, the water pressure and flux, etc. The effects of the modes of annular spray water cooling and related cooling parameters on the mechanical properties of the pipe are investigated. The temperature evolutions of the inner and outer walls of the pipe are measured during the spray water cooling process, and the uniformity of mechanical properties along the circumferential and longitudinal directions is investigated. A heat transfer coefficient model of spray water cooling is developed based on measured temperature data in conjunction with simulation using the finite element method. Industrial tests prove the validity of the heat transfer model of a steel pipe undergoing spray water cooling. The research results can provide a basis for the industrial application of the OSWC process in the production of ERW steel pipes. PMID:26201073

  17. Heat Transfer Modeling of an Annular On-Line Spray Water Cooling Process for Electric-Resistance-Welded Steel Pipe.

    PubMed

    Chen, Zejun; Han, Huiquan; Ren, Wei; Huang, Guangjie

    2015-01-01

    On-line spray water cooling (OSWC) of electric-resistance-welded (ERW) steel pipes can replace the conventional off-line heat treatment process and become an important and critical procedure. The OSWC process improves production efficiency, decreases costs, and enhances the mechanical properties of ERW steel pipe, especially the impact properties of the weld joint. In this paper, an annular OSWC process is investigated based on an experimental simulation platform that can obtain precise real-time measurements of the temperature of the pipe, the water pressure and flux, etc. The effects of the modes of annular spray water cooling and related cooling parameters on the mechanical properties of the pipe are investigated. The temperature evolutions of the inner and outer walls of the pipe are measured during the spray water cooling process, and the uniformity of mechanical properties along the circumferential and longitudinal directions is investigated. A heat transfer coefficient model of spray water cooling is developed based on measured temperature data in conjunction with simulation using the finite element method. Industrial tests prove the validity of the heat transfer model of a steel pipe undergoing spray water cooling. The research results can provide a basis for the industrial application of the OSWC process in the production of ERW steel pipes.

  18. A Jurassic Shock-Aftershock Earthquake Sequence Recorded by Small Clastic Pipes and Dikes within Dune Cross-Strata, Zion National Park, Utah

    NASA Astrophysics Data System (ADS)

    Loope, D. B.; Zlotnik, V. A.; Kettler, R. M.; Pederson, D. T.

    2012-12-01

    Eolian sandstones of south-central and southeast Utah contain large volumes of contorted cross-strata that have long been recognized as products of liquefaction caused by seismic shaking. Unlike most sites where Navajo Sandstone is exposed, in Zion National Park (southwestern Utah), the Navajo contains very, very few contorted strata. We have, however, mapped the distribution of more than 1,000 small-scale, vertical pipes and dikes in uncontorted cross-strata of the Navajo at two small study sites in Zion. Pipes are 2-5 cm in diameter and up to 3 m long; dikes are ~6 cm wide. Clusters of the water-escape structures lie directly above and below numerous, near-horizontal bounding surfaces. Dikes are restricted to the wind-ripple strata that lie above the bounding surfaces. Pipes are common both above and below the bounding surfaces. In map view, most pipes are arranged in lines. Near the bounding surfaces, pipes merge upward with shallow dikes trending parallel to the lines of pipes. Pipes formed in grainflows—homogeneous, well-sorted sand lacking cohesion. Dikes formed above the bounding surface, in more-cohesive, poorly sorted, wind-ripple strata. As liquefaction began, expansion of subsurface sand caused spreading within the unliquified (capping) beds near the land surface. Dikes intruded cracks in the wind-ripple strata, and pipes rose from the better-sorted sand to interdune surfaces, following trends of cracks. Because the wind-ripple strata had low cohesive strength, a depression formed around each rupture, and ejected sand built upward to a flat-topped surface rather than forming the cone of a classic sand volcano. In one 3 m2 portion of the map area, a cluster of about 20 pipes and dikes, many with truncated tops, record eight stratigraphically distinct seismic events. The large dunes that deposited the Navajo cross-strata likely moved ~1m/yr. When, in response to seismic shaking, a few liters of fluidized sand erupted onto the lowermost portion of the dune lee slope through a pipe, the erupted sand dried and was buried by climbing wind-ripple strata as the large dune continued to advance downwind. The mapped cluster recording eight distinct seismic events lies within thin-laminated sediment that was deposited by wind ripples during 1 m (~ 1 year) of southeastward dune migration. We conclude that the small pipes and dikes of our study sites are products of numerous >MM 5 earthquakes, some of which recurred at intervals of less than 2 months. We interpret one small cluster of pipes and dikes with well-defined upward terminations as a distinct shock-aftershock sequence. Because the largest modern earthquakes can produce surface liquefaction only up to about 175 km from their epicenters, the Jurassic epicenters must have been well within that distance. The tendency of modern plate boundaries to produce high-frequency aftershocks suggests that the epicenter for this Jurassic sequence lay to the southwest, within the plate boundary zone (not within continental rocks to the east). As eolian dunes steadily migrate over interdune surfaces underlain by water-saturated dune cross-strata, the thin, distinct laminae produced by the wind ripples that occupy dune toes can faithfully record high-frequency seismic events.

  19. Experimental research and numerical simulation on cryogenic line chill-down process

    NASA Astrophysics Data System (ADS)

    Jin, Lingxue; Cho, Hyokjin; Lee, Cheonkyu; Jeong, Sangkwon

    2018-01-01

    The empirical heat transfer correlations are suggested for the fast cool down process of the cryogenic transfer line from room temperature to cryogenic temperature. The correlations include the heat transfer coefficient (HTC) correlations for single-phase gas convection and film boiling regimes, minimum heat flux (MHF) temperature, critical heat flux (CHF) temperature and CHF. The correlations are obtained from the experimental measurements. The experiments are conducted on a 12.7 mm outer diameter (OD), 1.25 mm wall thickness and 7 m long stainless steel horizontal pipe with liquid nitrogen (LN2). The effect of the lengthwise position is verified by measuring the temperature profiles in near the inlet and the outlet of the transfer line. The newly suggested heat transfer correlations are applied to the one-dimensional homogeneous transient model to simulate the cryogenic line chill-down process, and the chill-down time and the cryogen consumption are well predicted in the mass flux range from 26.0 kg/m2 s to 73.6 kg/m2 s through the correlations.

  20. 76 FR 76396 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ... Due: 5 p.m. ET 12/12/11. Docket Numbers: RP12-198-000. Applicants: Chandeleur Pipe Line Company. Description: Chandeleur Pipe Line Company's FLLA Tariff Filing to be effective 1/1/2012. Filed Date: 11/30/11...

  1. Starting characteristics and combustion performance of magnesium slurry in 6.5-inch-diameter ram-jet engine mounted in connected-pipe facility

    NASA Technical Reports Server (NTRS)

    Gibbs, James B

    1954-01-01

    The starting characteristics and combustion performance of slurry type fuels, consisting of 50 percent magnesium powder in a hydrocarbon carrier, have been investigated in a flight-type, 6.5-inch-diameter ram-jet engine in a connected-pipe facility. Quick, dependable starting of the engine was obtained by the use of a disk which blocked part of the combustor area downstream of the flame holder. Acceptable performance was achieved with a short fuel-air mixing length by the development of a fuel-distribution control sleeve.

  2. 75 FR 6183 - Certain Seamless Carbon and Alloy Steel Standard, Line, and Pressure Pipe from the People's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... antidumping duty investigation on certain seamless carbon and alloy steel standard, line, and pressure pipe from the People's Republic of China. See Certain Seamless Carbon and Alloy Steel Standard, Line, and... DEPARTMENT OF COMMERCE INTERNATIONAL TRADE ADMINISTRATION (A-570-956) Certain Seamless Carbon and...

  3. Mineralogical Evidence of Galvanic Corrosion in Domestic, Drinking Water Pipes

    EPA Science Inventory

    Drinking water distribution system (DWDS) piping contains numerous examples of galvanically-coupled metals (e.g., soldered copper pipe joints, copper-lead pipes joined during partial replacements of lead service lines). The possible role of galvanic corrosion in the release of l...

  4. Distribution of radioactive isotopes in rock and ore of Arkhangelskaya pipe from the Arkhangelsk diamond province

    NASA Astrophysics Data System (ADS)

    Kiselev, G. P.; Yakovlev, E. Yu.; Druzhinin, S. V.; Galkin, A. S.

    2017-09-01

    The contents of radioactive elements and the uranium isotopic composition of kimberlite in the Arkhangelskaya pipe at the M.V. Lomonosov deposit and of nearby country rocks have been studied. A surplus of 234U isotope has been established in rocks from the near-pipe space. The high γ = 234U/238U ratio is controlled by the geological structure of the near-pipe space. A nonequilibrium uranium halo reaches two pipe diameters in size and can be regarded as a local ore guide for kimberlite discovery. The rocks in the nearpipe space are also characterized by elevated or anomalous U, Th, and K contents with respect to the background.

  5. Long-Term Behavior of Simulated Partial Lead Service Line Replacements

    PubMed Central

    St. Clair, Justin; Cartier, Clement; Triantafyllidou, Simoni; Clark, Brandi; Edwards, Marc

    2016-01-01

    Abstract In this 48-month pilot study, long-term impacts of copper:lead galvanic connections on lead release to water were assessed without confounding differences in pipe exposure prehistory or disturbances arising from cutting lead pipe. Lead release was tracked from three lead service line configurations, including (1) 100% lead, (2) traditional partial replacement with 50% copper upstream of 50% lead, and (3) 50% lead upstream of 50% copper as a function of flow rate, connection types, and sampling methodologies. Elevated lead from galvanic corrosion worsened with time, with 140% more lead release from configurations representing traditional partial replacement configurations at 14 months compared to earlier data in the first 8 months. Even when sampled consistently at moderate flow rate (8 LPM) and collecting all water passing through service lines, conditions representing traditional partial service line configurations were significantly worse (≈40%) when compared to 100% lead pipe. If sampled at a high flow rate (32 LPM) and collecting 2 L samples from service lines, 100% of samples collected from traditional partial replacement configurations exceeded thresholds posing an acute health risk versus a 0% risk for samples from 100% lead pipe. Temporary removal of lead accumulations near Pb:Cu junctions and lead deposits from other downstream plastic pipes reduced risk of partial replacements relative to that observed for 100% lead. When typical brass compression couplings were used to connect prepassivated lead pipes, lead release spiked up to 10 times higher, confirming prior concerns raised at bench and field scale regarding adverse impacts of crevices and service line disturbances on lead release. To quantify semirandom particulate lead release from service lines in future research, whole-house filters have many advantages compared to other approaches. PMID:26989344

  6. Pulsating Heat pipe Only for Space (PHOS): results of the REXUS 18 sounding rocket campaign

    NASA Astrophysics Data System (ADS)

    Creatini, F.; Guidi, G. M.; Belfi, F.; Cicero, G.; Fioriti, D.; Di Prizio, D.; Piacquadio, S.; Becatti, G.; Orlandini, G.; Frigerio, A.; Fontanesi, S.; Nannipieri, P.; Rognini, M.; Morganti, N.; Filippeschi, S.; Di Marco, P.; Fanucci, L.; Baronti, F.; Mameli, M.; Manzoni, M.; Marengo, M.

    2015-11-01

    Two Closed Loop Pulsating Heat Pipes (CLPHPs) are tested on board REXUS 18 sounding rocket in order to obtain data over a relatively long microgravity period (approximately 90 s). The CLPHPs are partially filled with FC-72 and have, respectively, an inner tube diameter larger (3 mm) and slightly smaller (1.6 mm) than the critical diameter evaluated in static Earth gravity conditions. On ground, the small diameter CLPHP effectively works as a Pulsating Heat Pipe (PHP): the characteristic slug and plug flow pattern forms inside the tube and the heat exchange is triggered by thermally driven self-sustained oscillations of the working fluid. On the other hand, the large diameter CLPHP works as a two- phase thermosyphon in vertical position and doesn't work in horizontal position: in this particular condition, the working fluid stratifies within the device as the surface tension force is no longer able to balance buoyancy. Then, the idea to test the CLPHPs in reduced gravity conditions: as the gravity reduces the buoyancy forces becomes less intense and it is possible to recreate the typical PHP flow pattern also for larger inner tube diameters. This allows to increase the heat transfer rate and, consequently, to decrease the overall thermal resistance. Even though it was not possible to experience low gravity conditions due to a failure in the yoyo de-spin system, the thermal response to the peculiar acceleration field (hyper-gravity) experienced on board are thoroughly described.

  7. Numerical calculation of the parameters of the efflux from a helium dewar used for cooling of heat shields in a satellite

    NASA Technical Reports Server (NTRS)

    Brendley, K.; Chato, J. C.

    1982-01-01

    The parameters of the efflux from a helium dewar in space were numerically calculated. The flow was modeled as a one dimensional compressible ideal gas with variable properties. The primary boundary conditions are flow with friction and flow with heat transfer and friction. Two PASCAL programs were developed to calculate the efflux parameters: EFFLUZD and EFFLUXM. EFFLUXD calculates the minimum mass flow for the given shield temperatures and shield heat inputs. It then calculates the pipe lengths, diameter, and fluid parameters which satisfy all boundary conditions. Since the diameter returned by EFFLUXD is only rarely of nominal size, EFFLUXM calculates the mass flow and shield heat exchange for given pipe lengths, diameter, and shield temperatures.

  8. Thermo-Mechanical Analysis of a Single-Pass Weld Overlay and Girth Welding in Lined Pipe

    NASA Astrophysics Data System (ADS)

    Obeid, Obeid; Alfano, Giulio; Bahai, Hamid

    2017-08-01

    The paper presents a nonlinear heat-transfer and mechanical finite-element (FE) analyses of a two-pass welding process of two segments of lined pipe made of a SUS304 stainless steel liner and a C-Mn steel pipe. The two passes consist of the single-pass overlay welding (inner lap weld) of the liner with the C-Mn steel pipe for each segment and the single-pass girth welding (outer butt weld) of the two segments. A distributed power density of the moving welding torch and a nonlinear heat-transfer coefficient accounting for both radiation and convection have been used in the analysis and implemented in user subroutines for the FE code ABAQUS. The modeling procedure has been validated against previously published experimental results for stainless steel and carbon steel welding separately. The model has been then used to determine the isotherms induced by the weld overlay and the girth welding and to clarify their influence on the transient temperature field and residual stress in the lined pipe. Furthermore, the influence of the cooling time between weld overlay and girth welding and of the welding speed have been examined thermally and mechanically as they are key factors that can affect the quality of lined pipe welding.

  9. Extendable pipe crawler

    DOEpatents

    Hapstack, M.

    1991-05-28

    A pipe crawler is described having a front leg assembly and a back leg assembly connected together by two air cylinders, each leg assembly having four extendable legs and a pair of actuators for sliding the extendable legs radially outward to increase the range of the legs when the pipe crawler enters a section of a pipe having a larger diameter. The crawler crawls by inchworm'-like motion, the front leg assembly and back leg assembly alternately engaging and disengaging the wall of the pipe to hold the pipe crawler as the air cylinders alternately advance the front leg assembly and bring up the rear leg assembly. The pair of actuators of each leg assembly are parallel, adjacent and opposing acting so that each slides two adjacent extendable legs radially outward. 5 figures.

  10. Extendable pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hapstack, M.

    1991-05-28

    A pipe crawler is described having a front leg assembly and a back leg assembly connected together by two air cylinders, each leg assembly having four extendable legs and a pair of actuators for sliding the extendable legs radially outward to increase the range of the legs when the pipe crawler enters a section of a pipe having a larger diameter. The crawler crawls by inchworm'-like motion, the front leg assembly and back leg assembly alternately engaging and disengaging the wall of the pipe to hold the pipe crawler as the air cylinders alternately advance the front leg assembly andmore » bring up the rear leg assembly. The pair of actuators of each leg assembly are parallel, adjacent and opposing acting so that each slides two adjacent extendable legs radially outward. 5 figures.« less

  11. Extendable pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hapstack, M.

    1990-05-01

    A pipe crawler having a front leg assembly and a back leg assembly connected together by two air cylinders, each leg assembly having four extendable legs and a pair of actuators for sliding the extendable legs radically outward to increase the range of the legs when the pipe crawler enters a section of pipe having a larger diameter. The crawler crawls by inchworm''-like motion, the front leg assembly and back leg assembly alternately engaging and disengaging the wall of the pipe to hold the pipe crawler as the air cylinders alternately advance the front leg assembly and bring up themore » rear leg assembly. The pair of actuators of each leg assembly are parallel, adjacent and opposing acting so that each slides two adjacent extendable legs radially outward. 5 figs.« less

  12. 75 FR 81968 - Circular Welded Carbon Quality Steel Pipe From the People's Republic of China: Rescission of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... and its individual members, Allied Tube & Conduit, IPSCO Tubulars, Inc., Sharon Tube Company, Western Tube & Conduit Corporation, and Wheatland Tube Company (collectively, ``Petitioner''), that the... pipes and tubes, of circular cross-section, and with an outside diameter of 0.372 inches (9.45 mm) or...

  13. Calibration and testing of selected portable flowmeters for use on large irrigation systems

    USGS Publications Warehouse

    Luckey, Richard R.; Heimes, Frederick J.; Gaggiani, Neville G.

    1980-01-01

    Existing methods for measuring discharge of irrigation systems in the High Plains region are not suitable to provide the pumpage data required by the High Plains Regional Aquifer System Analysis. Three portable flowmeters that might be suitable for obtaining fast and accurate discharge measure-ments on large irrigation systems were tested during 1979 under both laboratory and field conditions: propeller type gated-pipe meter, a Doppler meter, and a transient-time meter.The gated-pipe meter was found to be difficult to use and sensitive to particulate matter in the fluid. The Doppler meter, while easy to use, would not function suitably on steel pipe 6 inches or larger in diameter, or on aluminum pipe larger than 8 inches in diameter. The transient-time meter was more difficult to use than the other two meters; however, this instrument provided a high degree of accuracy and reliability under a variety of conditions. Of the three meters tested, only the transient-time meter was found to be suitable for providing reliable discharge measurements on the variety of irrigation systems used in the High Plains region.

  14. Study of a heat rejection system for the Nuclear Electric Propulsion (NEP) spacecraft

    NASA Technical Reports Server (NTRS)

    Ernest, D. M.

    1982-01-01

    Two different heat pipe radiator elements, one intended for use with the power conversion subsystem of the NASA funded nuclear electric propulsion (NEP) spacecraft, and one intended for use with the DOE funded space power advanced reactor (SPAR) system were tested and evaluated. The NEP stainless steel/sodium heat pipe was 4.42 meters long and had a 1 cm diameter. Thermal performance testing at 920 K showed a non-limited power level of 3560 watts, well in excess of the design power of 2600 watts. This test verified the applicability of screen arteries for use in long radiator heat pipes. The SPAR titanium/potassium heat pipe was 5.5 meters long and had a semicircular crossection with a 4 cm diameter. Thermal performance testing at 775 K showed a maximum power level of 1.86 kW, somewhat short of the desired 2.6 kW beginning of life design requirement. The reduced performance was shown to be the result of the inability of the evaporator wall wick (shot blasted evaporator wall) to handle the required liquid flow.

  15. Rotary roller of no. 2 seamless line in bays 19 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Rotary roller of no. 2 seamless line in bays 19 and 20 of the main pipe mill building looking north. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  16. Rotary roller mandrel of no. 2 seamless line in bays ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Rotary roller mandrel of no. 2 seamless line in bays 19 and 20 of the main pipe mill building looking south. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  17. Taylorwilson four roll straightener of the no. 1 seamless line ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Taylor-wilson four roll straightener of the no. 1 seamless line in bay 12 of the main pipe mill building. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  18. Laws of Flow in Rough Pipes

    NASA Technical Reports Server (NTRS)

    Nikuradse, J

    1950-01-01

    An experimental investigation is made of the turbulent flow of water in pipes with various degrees of relative roughness. The pipes range in size from 25 to 100 millimeters in diameter and from 1800 to 7050 millimeters in length. Flow velocities permitted Reynolds numbers from about 10 (sup. 4) to 10 (sup. 6). The laws of resistance and velocity distributions were obtained as a function of relative roughness and Reynolds number. Mixing length, as described by Prandtl's mixing-length formula, is discussed in relation to the experimental results.

  19. Algorithms for optimization of branching gravity-driven water networks

    NASA Astrophysics Data System (ADS)

    Dardani, Ian; Jones, Gerard F.

    2018-05-01

    The design of a water network involves the selection of pipe diameters that satisfy pressure and flow requirements while considering cost. A variety of design approaches can be used to optimize for hydraulic performance or reduce costs. To help designers select an appropriate approach in the context of gravity-driven water networks (GDWNs), this work assesses three cost-minimization algorithms on six moderate-scale GDWN test cases. Two algorithms, a backtracking algorithm and a genetic algorithm, use a set of discrete pipe diameters, while a new calculus-based algorithm produces a continuous-diameter solution which is mapped onto a discrete-diameter set. The backtracking algorithm finds the global optimum for all but the largest of cases tested, for which its long runtime makes it an infeasible option. The calculus-based algorithm's discrete-diameter solution produced slightly higher-cost results but was more scalable to larger network cases. Furthermore, the new calculus-based algorithm's continuous-diameter and mapped solutions provided lower and upper bounds, respectively, on the discrete-diameter global optimum cost, where the mapped solutions were typically within one diameter size of the global optimum. The genetic algorithm produced solutions even closer to the global optimum with consistently short run times, although slightly higher solution costs were seen for the larger network cases tested. The results of this study highlight the advantages and weaknesses of each GDWN design method including closeness to the global optimum, the ability to prune the solution space of infeasible and suboptimal candidates without missing the global optimum, and algorithm run time. We also extend an existing closed-form model of Jones (2011) to include minor losses and a more comprehensive two-part cost model, which realistically applies to pipe sizes that span a broad range typical of GDWNs of interest in this work, and for smooth and commercial steel roughness values.

  20. Pulsatile turbulent flow through pipe bends at high Dean and Womersley numbers

    NASA Astrophysics Data System (ADS)

    Kalpakli, Athanasia; Örlü, Ramis; Tillmark, Nils; Alfredsson, P. Henrik

    2011-12-01

    Turbulent pulsatile flows through pipe bends are prevalent in internal combustion engine components which consist of bent pipe sections and branching conduits. Nonetheless, most of the studies related to pulsatile flows in pipe bends focus on incompressible, low Womersley and low Dean number flows, primarily because they aim in modeling blood flow, while internal combustion engine related flows have mainly been addressed in terms of integral quantities and consist of single point measurements. The present study aims at bridging the gap between these two fields by means of time-resolved stereoscopic particle image velocimetry measurements in a pipe bend with conditions that are close to those encountered in exhaust manifolds. The time/phase-resolved three-dimensional cross-sectional flow-field 3 pipe diameters downstream the pipe bend is captured and the interplay between different secondary motions throughout a pulse cycle is discussed.

  1. Technology Demonstration: Acoustic Condition Assessment of Wastewater Collection Systems

    EPA Science Inventory

    The overall objective of this demonstration project was to evaluate technologies that are designed for rapid deployment using portable equipment that can result in significant cost-savings to wastewater utilities. Smaller diameter pipes (i.e., less than 12-inch diameter) are gen...

  2. 49 CFR 192.319 - Installation of pipe in a ditch.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... transmission line that is to be operated at a pressure producing a hoop stress of 20 percent or more of SMYS must be installed so that the pipe fits the ditch so as to minimize stresses and protect the pipe... pipe coating from equipment or from the backfill material. (c) All offshore pipe in water at least 12...

  3. 49 CFR 192.319 - Installation of pipe in a ditch.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transmission line that is to be operated at a pressure producing a hoop stress of 20 percent or more of SMYS must be installed so that the pipe fits the ditch so as to minimize stresses and protect the pipe... pipe coating from equipment or from the backfill material. (c) All offshore pipe in water at least 12...

  4. Automatic welding systems gain world-wide acceptance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ives, G. Jr.

    1979-04-01

    Five automatic welding systems are currently available for commercial use, marketed by three US companies - CRC Automatic Welding Co., H.C. Price Co., and Diametrics Inc. - as well as by Belgium's S.A. Arcos Co. (the Orbimatic welding device) and France's Societe Serimer. The pioneer and leader of the field, CRC has served on 52 projects since 1969, including the 56-in. Orenburg line in the USSR. In comparison, the other systems have seen only limited activity. The Orbimatic welder has been used in the Netherlands and other Western European countries on projects with up to 42-in.-diameter pipe. The H.C. Pricemore » welder proved successful in North Sea construction and last year in Mexico's Troncal Sistema Nacional de Gas. The Diametrics welder relies on the electric flash-butt system used on large-diameter projects in the USSR. The most recent entry into the commerical market, France's Serimer completed field testing last year. Four other welders have recently been announced but are not yet commercially available.« less

  5. Elastomer liners for geothermal tubulars Y267 EPDM Liner Program:

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hirasuna, A.R.; Davis, D.L.; Flickinger, J.E.

    1987-12-01

    The elastomer, Y267 EPDM, has been identified as a hydrothermally stable material which can operate at temperatures in excess of 320/sup 0/C. The goal of the Y267 Liner Program was to demonstrate the feasibility of using this material as a liner for mild steel tubulars to prevent or mitigate corrosion. If successful, the usage of EPDM lined pipe by the geothermal community may have a significant impact on operating costs and serve as a viable alternative to the use of alloyed tubulars. Tooling procedures were developed under this program to mold a 0.64 cm (0.25'') thick Y267 EPDM liner intomore » a tubular test section 61 cm (2') in length and 19.1 cm (7.5'') in diameter (ID). A successful effort was made to identify a potential coupling agent to be used to bond the elastomer to the steel tubular wall. This agent was found to withstand the processing conditions associated with curing the elastomer at 288/sup 0/C and to retain a significant level of adhesive strength following hydrothermal testing in a synthetic brine at 260/sup 0/C for a period of 166 hours. Bonding tests were conducted on specimens of mild carbon steel and several alloys including Hastelloy C-276. An objective of the program was to field test the lined section of pipe mentioned above at a geothermal facility in the Imperial Valley. Though a test was conducted, problems encountered during the lining operation precluded an encouraging outcome. The results of the field demonstration were inconclusive. 6 refs., 13 figs., 13 tabs« less

  6. Determination of optimal tool parameters for hot mandrel bending of pipe elbows

    NASA Astrophysics Data System (ADS)

    Tabakajew, Dmitri; Homberg, Werner

    2018-05-01

    Seamless pipe elbows are important components in mechanical, plant and apparatus engineering. Typically, they are produced by the so-called `Hamburg process'. In this hot forming process, the initial pipes are subsequently pushed over an ox-horn-shaped bending mandrel. The geometric shape of the mandrel influences the diameter, bending radius and wall thickness distribution of the pipe elbow. This paper presents the numerical simulation model of the hot mandrel bending process created to ensure that the optimum mandrel geometry can be determined at an early stage. A fundamental analysis was conducted to determine the influence of significant parameters on the pipe elbow quality. The chosen methods and approach as well as the corresponding results are described in this paper.

  7. BOA: Asbestos pipe-insulation removal robot system, Phase 2. Topical report, January--June 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schempf, H.; Bares, J.E.

    This report explored the regulatory impact and cost-benefit of a robotic thermal asbestos pipe-insulation removal system over the current manual abatement work practice. The authors are currently in the second phase of a two-phase program to develop a robotic asbestos abatement system, comprised of a ground-based support system (including vacuum, fluid delivery, computing/electronics/power, and other subsystems) and several on-pipe removal units, each sized to handle pipes within a given diameter range. The intent of this study was to (i) aid in developing design and operational criteria for the overall system to maximize cost-efficiency, and (ii) to determine the commercial potentialmore » of a robotic pipe-insulation abatement system.« less

  8. Double wall vacuum tubing and method of manufacture

    DOEpatents

    Stahl, Charles R.; Gibson, Michael A.; Knudsen, Christian W.

    1989-01-01

    An evacuated double wall tubing is shown together with a method for the manufacture of such tubing which includes providing a first pipe of predetermined larger diameter and a second pipe having an O.D. substantially smaller than the I.D. of the first pipe. An evacuation opening is then in the first pipe. The second pipe is inserted inside the first pipe with an annular space therebetween. The pipes are welded together at one end. A stretching tool is secured to the other end of the second pipe after welding. The second pipe is then prestressed mechanically with the stretching tool an amount sufficient to prevent substantial buckling of the second pipe under normal operating conditions of the double wall pipe. The other ends of the first pipe and the prestressed second pipe are welded together, preferably by explosion welding, without the introduction of mechanical spacers between the pipes. The annulus between the pipes is evacuated through the evacuation opening, and the evacuation opening is finally sealed. The first pipe is preferably of steel and the second pipe is preferably of titanium. The pipes may be of a size and wall thickness sufficient for the double wall pipe to be structurally load bearing or may be of a size and wall thickness insufficient for the double wall pipe to be structurally load bearing, and the double wall pipe positioned with a sliding fit inside a third pipe of a load-bearing size.

  9. Interprovincial has completed the 540-mile Norman Wells line

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowland, L.O.

    Interprovinial Pipe Line Ltd., has completed and is now operating the 540-mi., 12-in. crude trunkline from Norman Wells, Northwest Territories, to Zama, Alberta. This is the largest and the only significant pipe line to be built north of the provincial boundaries. Construction was completed a month ahead of schedule and was comfortably under budget, through two winter seasons.

  10. Sintered Lining for Heat-Pipe Evaporator

    NASA Technical Reports Server (NTRS)

    Ernst, D. M.; Eastman, G. Y.

    1985-01-01

    Hotspots eliminated by lining inner wall. Distribution of heat transfer liquid in heat-pipe evaporator improved by lining inner wall with layer of sintered metal. Sintered layer takes place of layer of screen wick formerly sintered or bonded to wall. Since sintered layer always full of liquid, no hotspot of type that previously arose where former screen wick did not fit properly against wall.

  11. An asymptotic analysis of the laminar-turbulent transition of yield stress fluids in pipes

    NASA Astrophysics Data System (ADS)

    Myers, Tim G.; Mitchell, Sarah L.; Slatter, Paul

    2017-02-01

    The work in this paper concerns the axisymmetric pipe flow of a Herschel-Bulkley fluid, with the aim of determining a relation between the critical velocity (defining the transition between laminar and turbulent flow) and the pipe diameter in terms of the Reynolds number Re 3. The asymptotic behaviour for large and small pipes is examined and simple expressions for the leading order terms are presented. Results are then compared with experimental data. A nonlinear regression analysis shows that for the tested fluids the transition occurs at similar values to the Newtonian case, namely in the range 2100 < Re 3 < 2500.

  12. 77 FR 17479 - Star Pipe Products, Ltd.; Analysis of Proposed Consent Order To Aid Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... largest sellers of DIPF in the United States are Star, McWane, Inc. (``McWane''), and Sigma Corporation (``Sigma''). DIPF are used in municipal water distribution systems to change pipe diameter or pipeline... projects. The end users of DIPF are typically municipal and regional water authorities. DIPF prices are...

  13. Drinking water contaminants from epoxy resin-coated pipes: A field study.

    PubMed

    Rajasärkkä, Johanna; Pernica, Marek; Kuta, Jan; Lašňák, Jonáš; Šimek, Zdenĕk; Bláha, Luděk

    2016-10-15

    Rehabilitation of aged drinking water pipes is an extensive renovation and increasingly topical in many European cities. Spray-on-lining of drinking water pipes is an alternative cost-effective rehabilitation technology in which the insides of pipes are relined with organic polymer. A commonly used polymer is epoxy resin consisting of monomer bisphenol A (BPA). Leaching of BPA from epoxy lining to drinking water has been a concern among public and authorities. Currently epoxy lining is not recommended in some countries. BPA leaching has been demonstrated in laboratory studies but the behavior and ageing process of epoxy lining in situ is not well known. In this study 6 locations with different age epoxy linings of drinking water pipes done using two distinct technologies were studied. While bisphenol F, 4-n-nonylphenol, and 4-t-octylphenol were rarely found and in trace concentrations, BPA was detected in majority of samples. Pipes lined with the older technology (LSE) leached more BPA than those with more recent technology (DonPro): maxima in cold water were 0.25 μg/L and 10 ng/L, respectively. Incubation of water in pipes 8-10 h prior to sampling increased BPA concentration in cold water 1.1-43-fold. Hot water temperature caused even more BPA leaching - at maximum 23.5 μg/L. The influence of ageing of epoxy lining on BPA leaching on could be shown in case of LSE technology: locations with 8-9 years old lining leached 4-20-fold more BPA compared to a location with 2-year-old lining. Analysis of metals showed that epoxy lining can reduce especially iron concentration in water. No significant burden to water could be shown by the analyzed 72 volatile organic compounds, including epichlorhydrin, precursor used in epoxy resin. Estrogenicity was detected in water samples with the highest BPA loads. Comparable responses of two yeast bioreporters (estrogen receptor α and BPA-targeted) indicated that bisphenol-like compounds were the main cause of estrogenicity. Compared to the estimated average daily BPA exposure, additional BPA load via cold drinking water in the studied locations was low, maximum 8.7%. However, hot water should also be considered as exposure source due to higher BPA concentrations. Epoxy lined locations should be monitored in future in order to evaluate ageing process and control increasing leaching of potentially harmful chemicals. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  14. 46 CFR 56.50-20 - Pressure relief piping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... authorized by the Marine Safety Center. (b) Discharge lines (reproduces 122.6.2(d)). Discharge lines from pressure-relieving safety devices shall be designed to facilitate drainage. (c) Stop valves. Stop valves...

  15. 46 CFR 56.50-20 - Pressure relief piping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... authorized by the Marine Safety Center. (b) Discharge lines (reproduces 122.6.2(d)). Discharge lines from pressure-relieving safety devices shall be designed to facilitate drainage. (c) Stop valves. Stop valves...

  16. "Bridge #6 Rock Creek: Castiron 48" pipe lines to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    "Bridge #6 - Rock Creek: Cast-iron 48" pipe lines to Gravity - 1859." Construction photo of Pennsylvania Avenue Bridge, 1859. Photograph courtesy Washington Aqueduct Division, U.S. Army Corps of Engineers - Pennsylvania Avenue Bridge, Spanning Rock Creek & Potomac Parkway, Washington, District of Columbia, DC

  17. Procedure improves line pipe Charpy test interpretation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosenfeld, M.J.

    1997-04-14

    The Charpy V-notch (CVN) impact test is a method of characterizing a line-pipe material`s notch toughness and resistance to fracture growth. Although CVN testing of line pipe material is routine, test results are sometimes misinterpreted because of specimen size and load rate on actual toughness transition behavior. These effects are readily accounted for by a simple mathematical procedure, offered here, which enables extrapolation of the full-scale transition curve from as little as a single subsize specimen test. This procedure is useful when the toughness transition curve is incomplete or nonexistent. Toughness data may be incomplete because the API 5L toughnessmore » test establishes minimum performance at a single temperature, which does not reveal the full transition curve. Toughness data may be nonexistent because the first requirements for toughness testing of line pipe appeared in the 16th Edition of API 5LX in 1969, and those requirements remain at the option of the purchaser today.« less

  18. INTERIOR VIEW, LOOKING WEST, WITH PIPE BEING SPRAYED WITH ZINC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW, LOOKING WEST, WITH PIPE BEING SPRAYED WITH ZINC COATING. - United States Pipe & Foundry Company Plant, Coating, Painting, Lining & Packaging Building, 2023 St. Louis Avenue at I-20/59, Bessemer, Jefferson County, AL

  19. Swivel Joint For Liquid Nitrogen

    NASA Technical Reports Server (NTRS)

    Milner, James F.

    1988-01-01

    Swivel joint allows liquid-nitrogen pipe to rotate through angle of 100 degree with respect to mating pipe. Functions without cracking hard foam insulation on lines. Pipe joint rotates on disks so mechanical stress not transmitted to thick insulation on pipes. Inner disks ride on fixed outer disks. Disks help to seal pressurized liquid nitrogen flowing through joint.

  20. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  1. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  2. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  3. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  4. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  5. Ceramic backup ring prevents undesirable weld-metal buildup

    NASA Technical Reports Server (NTRS)

    Leonard, G. E.

    1971-01-01

    Removable ceramic backup material butted against weld zone back prevents weld metal buildup at that site. Method is successful with manual tungsten-inert gas /TIG/ welding of 316 corrosion resistant steel /CRES/ pieces with 0.76 cm throat diameter and 1.57 cm pipe internal diameter.

  6. Crack stability in a representative piping system under combined inertial and seismic/dynamic displacement-controlled stresses. Subtask 1.3 final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott, P.; Olson, R.; Wilkowski, O.G.

    1997-06-01

    This report presents the results from Subtask 1.3 of the International Piping Integrity Research Group (IPIRG) program. The objective of Subtask 1.3 is to develop data to assess analysis methodologies for characterizing the fracture behavior of circumferentially cracked pipe in a representative piping system under combined inertial and displacement-controlled stresses. A unique experimental facility was designed and constructed. The piping system evaluated is an expansion loop with over 30 meters of 16-inch diameter Schedule 100 pipe. The experimental facility is equipped with special hardware to ensure system boundary conditions could be appropriately modeled. The test matrix involved one uncracked andmore » five cracked dynamic pipe-system experiments. The uncracked experiment was conducted to evaluate piping system damping and natural frequency characteristics. The cracked-pipe experiments evaluated the fracture behavior, pipe system response, and stability characteristics of five different materials. All cracked-pipe experiments were conducted at PWR conditions. Material characterization efforts provided tensile and fracture toughness properties of the different pipe materials at various strain rates and temperatures. Results from all pipe-system experiments and material characterization efforts are presented. Results of fracture mechanics analyses, dynamic finite element stress analyses, and stability analyses are presented and compared with experimental results.« less

  7. Cost of Water Distribution System Infrastructure Rehabilitation, Repair, and Replacement.

    DTIC Science & Technology

    1985-03-01

    terms of the Hazen-Williams C-factor. New pipes have C-factors on the order of 140. Severely tuberculated pipes can have C-factors as low as 40. The C... tuberculation , and significantly higher pressures being required to push a pig through a small opening. Unit costs level off above the 10-in. diam and...additional costs of lining. Lining the pipe will: (a) prevent reoccurrence of tuberculation , (b) seal small leaks, and (c) eliminate "red - water" problems

  8. Piping Connector

    NASA Technical Reports Server (NTRS)

    1994-01-01

    In Stennis Space Center's Component Test Facility, piping lines carry rocket propellants and high pressure cryogenic fuels. When the lines are chilled to a pretest temperature of 400 degrees below zero, ordinary piping connectors can leak. Under contract to Stennis, Reflange, Inc. developed the T-Con connector, which included a secondary seal that tolerates severe temperature change. Because of the limited need for the large and expensive T-Con product, Reflange also developed the less costly E-Con, a smaller more compact design with the same technical advantages as the T-Con.

  9. Boring in the Big City - part 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giuliani, A.J.

    This paper describes technologies being utilized or tested by Brooklyn Union for gas main installation. Trenchless technologies described include pipe splitting, key holes to minimize excavations, and boring. Areas in lining system technology which require further development by vendors and manufacturers of trenchless equipment are also addressed. Specific needs identified include: (1) improving instrumentation for locating and controlling underground boring; (2) repairing soft and hard lining systems; and (3) developing a window cutter to safely remove the old carrier pipes without damaging the newly fitted internal plastic pipes.

  10. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  11. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  12. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  13. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  14. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  15. 77 FR 59391 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... Proposed Brandywine Creek Replacement Project; Request for Comments on Environmental Issues; and Notice of... Transcontinental Gas Pipe Line Company, LLC's (Transco) proposed Brandywine Creek Replacement Project (Project... participation section of this notice. FERC Public Scoping Meeting, Brandywine Creek Replacement Project, October...

  16. Pipe gripper

    DOEpatents

    Moyers, S.M.

    1975-12-16

    A device for gripping the exterior surface of a pipe or rod is described which has a plurality of wedges, each having a concave face which engages the outer surface of the pipe and each having a smooth face opposing the concave face. The wedges are seated on and their grooved concave faces are maintained in circular alignment by tapered axial segments of an opening extending through a wedge-seating member. The wedges are allowed to slide across the tapered axial segments so that such a sliding movement acts to vary the diameter of the circular alignment.

  17. Response Action Plan for the Basin F Interim Response Action Waste Pile.

    DTIC Science & Technology

    1992-10-01

    the Waste Pile via an 8-Inch diameter HDPE stand pipe. A stainless - steel submersible pump provides the lift to deliver the collected liquid 5 to the...2.1.4 Settlement Measuring System 3 Nine settlement plates were installed at the base of the Waste Pile during its construction. A 1-Inch steel pipe...PLATE STEEL CONDUIT. PIPE GS: 5219.61 GS: 5219.98 GS: 5219.56 GS: 5219.50 SPSP: 5217.87 SPSP: 5217.94 SPSP: 5218.59 THP: 5221.25 THP: 5221.41 THP

  18. 49 CFR 192.309 - Repair of steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Repair of steel pipe. 192.309 Section 192.309... Lines and Mains § 192.309 Repair of steel pipe. (a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or removed. If a repair is made by grinding, the...

  19. 49 CFR 192.309 - Repair of steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Repair of steel pipe. 192.309 Section 192.309... Lines and Mains § 192.309 Repair of steel pipe. (a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or removed. If a repair is made by grinding, the...

  20. 49 CFR 192.309 - Repair of steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Repair of steel pipe. 192.309 Section 192.309... Lines and Mains § 192.309 Repair of steel pipe. (a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or removed. If a repair is made by grinding, the...

  1. 49 CFR 192.309 - Repair of steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Repair of steel pipe. 192.309 Section 192.309... Lines and Mains § 192.309 Repair of steel pipe. (a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or removed. If a repair is made by grinding, the...

  2. Localised surface plasmon-like resonance generated by microwave electromagnetic waves in pipe defects

    NASA Astrophysics Data System (ADS)

    Alobaidi, Wissam M.; Nima, Zeid A.; Sandgren, Eric

    2018-01-01

    Localised surface plasmon (LSP)-like resonance phenomena were simulated in COMSOL Multiphysics™, and the electric field enhancement was evaluated in eight pipe defects using the microwave band from 1.80 to 3.00 GHz and analysed by finite element analysis (FEA). The simulation was carried out, in each defect case, on a pipe that has 762 mm length and 152.4 mm inner diameter, and 12.7 mm pipe wall thickness. Defects were positioned in the middle of the pipe and were named as follows; SD: Square Defect, FCD: fillet corner defect, FD: fillet defect, HCD: half circle defect, TCD: triangle corner defect, TD: triangle defect, ZD: zigzag defect, GD: gear defect. The LSP electric field, and scattering parametric (S21, and S11) waves were evaluated in all cases and found to be strongly dependent on the size and the shape of the defect rather than the pipe and or the medium materials.

  3. Ultrasonic guided waves in eccentric annular pipes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pattanayak, Roson Kumar; Balasubramaniam, Krishnan; Rajagopal, Prabhu

    2014-02-18

    This paper studies the feasibility of using ultrasonic guided waves to rapidly inspect tubes and pipes for possible eccentricity. While guided waves are well established in the long range inspection of structures such as pipes and plates, studies for more complex cross sections are limited and analytical solutions are often difficult to obtain. Recent developments have made the Semi Analytical Finite Element (SAFE) method widely accessible for researchers to study guided wave properties in complex structures. Here the SAFE method is used to study the effect of eccentricity on the modal structures and velocities of lower order guided wave modesmore » in thin pipes of diameters typically of interest to the industry. Results are validated using experiments. The paper demonstrates that even a small eccentricity in the pipe can strongly affect guided wave mode structures and velocities and hence shows potential for pipe eccentricity inspection.« less

  4. Conformable apparatus in a drill string

    DOEpatents

    Hall, David R [Provo, UT; Hall, Jr., H. Tracy; Pixton, David S [Lehi, UT; Fox, Joe [Spanish Fork, UT

    2007-08-28

    An apparatus in a drill string comprises an internally upset drill pipe. The drill pipe comprises a first end, a second end, and an elongate tube intermediate the first and second ends. The elongate tube and the ends comprising a continuous an inside surface with a plurality of diameters. A conformable metal tube is disposed within the drill pipe intermediate the ends thereof and terminating adjacent to the ends of the drill pipe. The conformable metal tube substantially conforms to the continuous inside surface of the metal tube. The metal tube may comprise a non-uniform section which is expanded to conform to the inside surface of the drill pipe. The non-uniform section may comprise protrusions selected from the group consisting of convolutions, corrugations, flutes, and dimples. The non-uniform section extends generally longitudinally along the length of the tube. The metal tube may be adapted to stretch as the drill pipes stretch.

  5. Sonic limitations and startup problems of heat pipes

    NASA Technical Reports Server (NTRS)

    Deverall, J. E.; Kemme, J. E.; Florschuetz, L. W.

    1972-01-01

    Introduction of small amounts of inert, noncombustible gas aids startup in certain types of heat pipes. When the heat pipe is closely coupled to the heat sink, the startup system must be designed to bring the heat sink on-line slowly.

  6. Understanding the environmental implications of cured-in-place pipe rehabilitation technology.

    DOT National Transportation Integrated Search

    2008-01-01

    Cured-in-place (CIPP) rehabilitation is a commonly used technology for pipe repair, and transportation agencies are using CIPP technology to repair damaged pipe culverts. In typical CIPP applications, a lining tube saturated with a thermosetting resi...

  7. 40 CFR 61.346 - Standards: Individual drain systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Each junction box shall be equipped with a cover and may have a vent pipe. The vent pipe shall be at least 90 cm (3 ft) in length and shall not exceed 10.2 cm (4 in) in diameter. (i) Junction box covers... inspection and maintenance. (ii) One of the following methods shall be used to control emissions from the...

  8. 40 CFR 61.346 - Standards: Individual drain systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Each junction box shall be equipped with a cover and may have a vent pipe. The vent pipe shall be at least 90 cm (3 ft) in length and shall not exceed 10.2 cm (4 in) in diameter. (i) Junction box covers... inspection and maintenance. (ii) One of the following methods shall be used to control emissions from the...

  9. 40 CFR 61.346 - Standards: Individual drain systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Each junction box shall be equipped with a cover and may have a vent pipe. The vent pipe shall be at least 90 cm (3 ft) in length and shall not exceed 10.2 cm (4 in) in diameter. (i) Junction box covers... inspection and maintenance. (ii) One of the following methods shall be used to control emissions from the...

  10. Reestablishment of Native Riparian Species at an Altered High Elevation Site

    Treesearch

    Franklin J. Chan; Raymond W. Wong

    1989-01-01

    The failure of a 22-foot-diameter pipe caused an estimated water flow of 40,000 cfs for approximately one hour, which scoured and removed 1.75 million cubic yards of soil and vegetation from Lost Canyon. Mitigation for the damage caused by the pipe failure included reestablishing the lost vegetation. This paper describes the process of reestablishment including the...

  11. Fatigue evaluation of socket welded piping in nuclear power plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vecchio, R.S.

    1996-12-01

    Fatigue failures in piping systems occur, almost without exception, at the welded connections. In nuclear power plant systems, such failures occur predominantly at the socket welds of small diameter piping ad fillet attachment welds under high-cycle vibratory conditions. Nearly all socket weld fatigue failures are identified by leaks which, though not high in volume, generally are costly due to attendant radiological contamination. Such fatigue cracking was recently identified in the 3/4 in. diameter recirculation and relief piping socket welds from the reactor coolant system (RCS) charging pumps at a nuclear power plant. Consequently, a fatigue evaluation was performed to determinemore » the cause of cracking and provide an acceptable repair. Socket weld fatigue life was evaluated using S-N type fatigue life curves for welded structures developed by AASHTO and the assessment of an effective cyclic stress range adjacent to each socket weld. Based on the calculated effective tress ranges and assignment of the socket weld details to the appropriate AASHTO S-N curves, the socket weld fatigue lives were calculated and found to be in excellent agreement with the accumulated cyclic life to-date.« less

  12. Determination of Hydrodynamic Parameters on Two--Phase Flow Gas - Liquid in Pipes with Different Inclination Angles Using Image Processing Algorithm

    NASA Astrophysics Data System (ADS)

    Montoya, Gustavo; Valecillos, María; Romero, Carlos; Gonzáles, Dosinda

    2009-11-01

    In the present research a digital image processing-based automated algorithm was developed in order to determine the phase's height, hold up, and statistical distribution of the drop size in a two-phase system water-air using pipes with 0 , 10 , and 90 of inclination. Digital images were acquired with a high speed camera (up to 4500fps), using an equipment that consist of a system with three acrylic pipes with diameters of 1.905, 3.175, and 4.445 cm. Each pipe is arranged in two sections of 8 m of length. Various flow patterns were visualized for different superficial velocities of water and air. Finally, using the image processing program designed in Matlab/Simulink^, the captured images were processed to establish the parameters previously mentioned. The image processing algorithm is based in the frequency domain analysis of the source pictures, which allows to find the phase as the edge between the water and air, through a Sobel filter that extracts the high frequency components of the image. The drop size was found using the calculation of the Feret diameter. Three flow patterns were observed: Annular, ST, and ST&MI.

  13. 49 CFR 238.429 - Safety appliances.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-inch diameter steel pipe, 5/8-inch thickness steel, or a material of equal or greater mechanical strength. (2) All safety appliances shall be securely fastened to the car body structure with mechanical fasteners that have mechanical strength greater than or equal to that of a 1/2-inch diameter SAE grade steel...

  14. 49 CFR 238.429 - Safety appliances.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-inch diameter steel pipe, 5/8-inch thickness steel, or a material of equal or greater mechanical strength. (2) All safety appliances shall be securely fastened to the car body structure with mechanical fasteners that have mechanical strength greater than or equal to that of a 1/2-inch diameter SAE grade steel...

  15. The impact analysis of the connecting pipe length and diameter on the operation of a piston hybrid power machine of positive displacement with gas suction capacity

    NASA Astrophysics Data System (ADS)

    Shcherba, V. E.; Grigoriev, A. V.; Averyanov, G. S.; Surikov, V. I.; Vedruchenko, V. P.; Galdin, N. S.; Trukhanova, D. A.

    2017-08-01

    The article analyzes the impact of the connecting liquid pipe length and diameter on consumables and power characteristics of the piston hybrid power machine with gas suction capacity. The following operating characteristics of the machine were constructed and analyzed: the average height of the liquid column in the jacket space; instantaneous velocity and height of the liquid column in the jacket space; the relative height of the liquid column in the jacket space; volumetric efficiency; indicator isothermal efficiency; flowrate in the pump section; relative pressure losses during suction; relative flowrate. The dependence of the instantaneous pressure in the work space and the suction space of the compressor section on the rotation angle of the crankshaft is determined for different values of the length and diameter of the connecting pipeline.

  16. Deconvolution imaging of weak reflective pipe defects using guided-wave signals captured by a scanning receiver.

    PubMed

    Sun, Zeqing; Sun, Anyu; Ju, Bing-Feng

    2017-02-01

    Guided-wave echoes from weak reflective pipe defects are usually interfered by coherent noise and difficult to interpret. In this paper, a deconvolution imaging method is proposed to reconstruct defect images from synthetically focused guided-wave signals, with enhanced axial resolution. A compact transducer, circumferentially scanning around the pipe, is used to receive guided-wave echoes from discontinuities at a distance. This method achieves a higher circumferential sampling density than arrayed transducers-up to 72 sampling spots per lap for a pipe with a diameter of 180 mm. A noise suppression technique is used to enhance the signal-to-noise ratio. The enhancement in both signal-to-noise ratio and axial resolution of the method is experimentally validated by the detection of two kinds of artificial defects: a pitting defect of 5 mm in diameter and 0.9 mm in maximum depth, and iron pieces attached to the pipe surface. A reconstructed image of the pitting defect is obtained with a 5.87 dB signal-to-noise ratio. It is revealed that a high circumferential sampling density is important for the enhancement of the inspection sensitivity, by comparing the images reconstructed with different down-sampling ratios. A modified full width at half maximum is used as the criterion to evaluate the circumferential extent of the region where iron pieces are attached, which is applicable for defects with inhomogeneous reflection intensity.

  17. Robot Hand Grips Cylinders Securely

    NASA Technical Reports Server (NTRS)

    Parma, George F.

    1989-01-01

    Jaws and linkage accommodate various sizes. Robot hand includes two pairs of parallel jaws that grasp rods, pipes, tubes, struts, and other long, heavy cylindrical objects. Hand features compact rotary drive and butterfly configuration simplifying approach and gripping maneuvers of robot. Parallelogram linkages maintain alignment of each jaw with other jaws. One bar of each linkage connected to one of two concentric, counterrotating shafts; rotation of shafts moves jaws in each pair toward or away from each other to grasp or release workpiece. Each jaw includes rigid gripping pad lined with rubber to give firm grip and to prevent damage to workpiece. Inner cylindrical surface (corner) of each jaw tapers off to flat sides. Enables jaw to grasp workpieces with diameters larger than or equal to twice the corner radius.

  18. International Piping Integrity Research Group (IPIRG) Program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilkowski, G.; Schmidt, R.; Scott, P.

    1997-06-01

    This is the final report of the International Piping Integrity Research Group (IPIRG) Program. The IPIRG Program was an international group program managed by the U.S. Nuclear Regulatory Commission and funded by a consortium of organizations from nine nations: Canada, France, Italy, Japan, Sweden, Switzerland, Taiwan, the United Kingdom, and the United States. The program objective was to develop data needed to verify engineering methods for assessing the integrity of circumferentially-cracked nuclear power plant piping. The primary focus was an experimental task that investigated the behavior of circumferentially flawed piping systems subjected to high-rate loadings typical of seismic events. Tomore » accomplish these objectives a pipe system fabricated as an expansion loop with over 30 meters of 16-inch diameter pipe and five long radius elbows was constructed. Five dynamic, cyclic, flawed piping experiments were conducted using this facility. This report: (1) provides background information on leak-before-break and flaw evaluation procedures for piping, (2) summarizes technical results of the program, (3) gives a relatively detailed assessment of the results from the pipe fracture experiments and complementary analyses, and (4) summarizes advances in the state-of-the-art of pipe fracture technology resulting from the IPIRG program.« less

  19. View looking east in the main pipe mill building at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking east in the main pipe mill building at the operators pulpit of the east-west reelers, no. 2 seamless line. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  20. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  1. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  2. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  3. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  4. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  5. Degradation of homogeneous polymer solutions in high shear turbulent pipe flow

    NASA Astrophysics Data System (ADS)

    Elbing, B. R.; Winkel, E. S.; Solomon, M. J.; Ceccio, S. L.

    2009-12-01

    This study quantifies degradation of polyethylene oxide (PEO) and polyacrylamide (PAM) polymer solutions in large diameter (2.72 cm) turbulent pipe flow at Reynolds numbers to 3 × 105 and shear rates greater than 105 1/s. The present results support a universal scaling law for polymer chain scission reported by Vanapalli et al. (2006) that predicts the maximum chain drag force to be proportional to Re 3/2, validating this scaling law at higher Reynolds numbers than prior studies. Use of this scaling gives estimated backbone bond strengths from PEO and PAM of 3.2 and 3.8 nN, respectively. Additionally, with the use of synthetic seawater as a solvent the onset of drag reduction occurred at higher shear rates relative to the pure water solvent solutions, but had little influence on the extent of degradation at higher shear rates. These results are significant for large diameter pipe flow applications that use polymers to reduce drag.

  6. A New Differential Pressure Flow Meter for Measurement of Human Breath Flow: Simulation and Experimental Investigation

    PubMed Central

    Bridgeman, Devon; Tsow, Francis; Xian, Xiaojun; Forzani, Erica

    2016-01-01

    The development and performance characterization of a new differential pressure-based flow meter for human breath measurements is presented in this article. The device, called a “Confined Pitot Tube,” is comprised of a pipe with an elliptically shaped expansion cavity located in the pipe center, and an elliptical disk inside the expansion cavity. The elliptical disk, named Pitot Tube, is exchangeable, and has different diameters, which are smaller than the diameter of the elliptical cavity. The gap between the disk and the cavity allows the flow of human breath to pass through. The disk causes an obstruction in the flow inside the pipe, but the elliptical cavity provides an expansion for the flow to circulate around the disk, decreasing the overall flow resistance. We characterize the new sensor flow experimentally and theoretically, using Comsol Multiphysics® software with laminar and turbulent models. We also validate the sensor, using inhalation and exhalation tests and a reference method. PMID:27818521

  7. 77 FR 54926 - Certain Seamless Carbon and Alloy Steel; Standard, Line, and Pressure Pipe From Germany

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-709 (Third Review)] Certain Seamless Carbon and Alloy Steel; Standard, Line, and Pressure Pipe From Germany Determination On the basis of the record \\1\\ developed in the subject five-year review, the United States International Trade Commission...

  8. FLUSH - PREDICTION OF FLOW PARAMETERS OF SLUSH HYDROGEN

    NASA Technical Reports Server (NTRS)

    Hardy, T.

    1994-01-01

    Slush hydrogen, a mixture of the solid and liquid phases of hydrogen, is a possible source of fuel for the National Aerospace Plane (NASP) Project. Advantages of slush hydrogen over liquid hydrogen include greater heat capacity and greater density. However, practical use of slush hydrogen as a fuel requires systems of lines, valves, etc. which are designed to deliver the fuel in slush form with minimal solid loss as a result of pipe heating or flow friction. Engineers involved with the NASP Project developed FLUSH to calculate the pressure drop and slush hydrogen solid fraction loss for steady-state, one-dimensional flow. FLUSH solves the steady-state, one-dimensional energy equation and the Bernoulli equation for pipe flow. The program performs these calculations for each two-node element--straight pipe length, elbow, valve, fitting, or other part of the piping system--specified by the user. The user provides flow rate, upstream pressure, initial solid hydrogen fraction, element heat leak, and element parameters such as length and diameter. For each element, FLUSH first calculates the pressure drop, then figures the slush solid fraction exiting the element. The code employs GASPLUS routines to calculate thermodynamic properties for the slush hydrogen. FLUSH is written in FORTRAN IV for DEC VAX series computers running VMS. An executable is provided on the tape. The GASPLUS physical properties routines which are required for building the executable are included as one object library on the program media (full source code for GASPLUS is available separately as COSMIC Program Number LEW-15091). FLUSH is available in DEC VAX BACKUP format on a 9-track 1600 BPI magnetic tape (standard media) or on a TK50 tape cartridge. FLUSH was developed in 1989.

  9. Tribological characterization of the drill pipe tool joints reconditioned by using welding technologies

    NASA Astrophysics Data System (ADS)

    Caltaru, M.; Badicioiu, M.; Ripeanu, R. G.; Dinita, A.; Minescu, M.; Laudacescu, E.

    2018-01-01

    Drill pipe is a seamless steel pipe with upset ends fitted with special threaded ends that are known as tool joints. During drilling operations, the wall thickness of the drill pipe and the outside diameter of the tool joints will be gradually reduced due to wear. The present research work investigate the possibility of reconditioning the drill pipe tool joints by hardbanding with a new metal-cored coppered flux cored wire, Cr-Mo alloyed, using the gas metal active welding process, taking into considerations two different hardbanding technologies, consisting in: hardbanding drill pipe tool joints after removing the old hardbanding material and surface reconstruction with a compensation material (case A), and hardbanding tool joint drill pipe, without removing the old hardbanding material (case B). The present paper brings forward the experimental researches regarding the tribological characterization of the reconditioned drill pipe tool joint by performing macroscopic analyses, metallographic analyses, Vickers hardness measurement, chemical composition measurement and wear tests conducted on ball on disk friction couples, in order to certify the quality of the hardbanding obtained by different technological approaches, to validate the optimum technology.

  10. High temperature thermal energy storage in steel and sand

    NASA Technical Reports Server (NTRS)

    Turner, R. H.

    1979-01-01

    The technical and economic potential for high temperature (343 C, 650 F) thermal energy storage in hollow steel ingots, pipes embedded in concrete, and for pipes buried in sand was evaluated. Because it was determined that concrete would separate from pipes due to thermal stresses, concrete was replaced by sand, which is free from thermal stresses. Variations of the steel ingot concept were not cost effective compared to the sand-pipe approach, therefore, the sand-pipe thermal storage unit (TSU) was evaluated in depth to assess the approximate tube spacing requirements consistent with different system performance characteristics and also attendant system costs. For large TSUs which do not require fast response times, the sand-pipe approach offers attractive possibilities. A pipe diameter about 9 cm (3.5 in) and pipe spacing of approximately 25 cm (10 in), with sand filling the interspaces, appears appropriate. Such a TSU system designed for 8 hours charge/discharge cycle has an energy unit storage cost (CE) of $2.63/kWhr-t and a power unit storage cost (Cp) of $42/kW-t (in 1977 dollars).

  11. Evaluation of abrasion resistance of pipe and pipe lining materials.

    DOT National Transportation Integrated Search

    2007-09-01

    This project summarizes an evaluation of pipe material resistance to abrasion over a 5-year period (2001-2006) at a site known to be abrasive. : The key focus of the project was to gather more information to compare against existing guidance to desig...

  12. Sparse reconstruction localization of multiple acoustic emissions in large diameter pipelines

    NASA Astrophysics Data System (ADS)

    Dubuc, Brennan; Ebrahimkhanlou, Arvin; Salamone, Salvatore

    2017-04-01

    A sparse reconstruction localization method is proposed, which is capable of localizing multiple acoustic emission events occurring closely in time. The events may be due to a number of sources, such as the growth of corrosion patches or cracks. Such acoustic emissions may yield localization failure if a triangulation method is used. The proposed method is implemented both theoretically and experimentally on large diameter thin-walled pipes. Experimental examples are presented, which demonstrate the failure of a triangulation method when multiple sources are present in this structure, while highlighting the capabilities of the proposed method. The examples are generated from experimental data of simulated acoustic emission events. The data corresponds to helical guided ultrasonic waves generated in a 3 m long large diameter pipe by pencil lead breaks on its outer surface. Acoustic emission waveforms are recorded by six sparsely distributed low-profile piezoelectric transducers instrumented on the outer surface of the pipe. The same array of transducers is used for both the proposed and the triangulation method. It is demonstrated that the proposed method is able to localize multiple events occurring closely in time. Furthermore, the matching pursuit algorithm and the basis pursuit densoising approach are each evaluated as potential numerical tools in the proposed sparse reconstruction method.

  13. Influence of Spatial Resolution in Three-dimensional Cine Phase Contrast Magnetic Resonance Imaging on the Accuracy of Hemodynamic Analysis

    PubMed Central

    Fukuyama, Atsushi; Isoda, Haruo; Morita, Kento; Mori, Marika; Watanabe, Tomoya; Ishiguro, Kenta; Komori, Yoshiaki; Kosugi, Takafumi

    2017-01-01

    Introduction: We aim to elucidate the effect of spatial resolution of three-dimensional cine phase contrast magnetic resonance (3D cine PC MR) imaging on the accuracy of the blood flow analysis, and examine the optimal setting for spatial resolution using flow phantoms. Materials and Methods: The flow phantom has five types of acrylic pipes that represent human blood vessels (inner diameters: 15, 12, 9, 6, and 3 mm). The pipes were fixed with 1% agarose containing 0.025 mol/L gadolinium contrast agent. A blood-mimicking fluid with human blood property values was circulated through the pipes at a steady flow. Magnetic resonance (MR) images (three-directional phase images with speed information and magnitude images for information of shape) were acquired using the 3-Tesla MR system and receiving coil. Temporal changes in spatially-averaged velocity and maximum velocity were calculated using hemodynamic analysis software. We calculated the error rates of the flow velocities based on the volume flow rates measured with a flowmeter and examined measurement accuracy. Results: When the acrylic pipe was the size of the thoracicoabdominal or cervical artery and the ratio of pixel size for the pipe was set at 30% or lower, spatially-averaged velocity measurements were highly accurate. When the pixel size ratio was set at 10% or lower, maximum velocity could be measured with high accuracy. It was difficult to accurately measure maximum velocity of the 3-mm pipe, which was the size of an intracranial major artery, but the error for spatially-averaged velocity was 20% or less. Conclusions: Flow velocity measurement accuracy of 3D cine PC MR imaging for pipes with inner sizes equivalent to vessels in the cervical and thoracicoabdominal arteries is good. The flow velocity accuracy for the pipe with a 3-mm-diameter that is equivalent to major intracranial arteries is poor for maximum velocity, but it is relatively good for spatially-averaged velocity. PMID:28132996

  14. The effect of geometry and operation conditions on the performance of a gas-liquid cylindrical cyclone separator with new structure

    NASA Astrophysics Data System (ADS)

    Han, Qing; Zhang, Chi; Xu, Bo; Chen, Jiangping

    2013-07-01

    The hydrodynamic flow behavior, effects of geometry and working conditions of a gas-liquid cylindrical cyclone separator with a new structure are investigated by computational fluid dynamic and experiment. Gas liquid cylindrical cyclone separator is widely used in oil industry, refrigeration system because of its simple structure, high separating efficiency, little maintenance and no moving parts nor internal devices. In this work, a gas liquid cylindrical cyclone separator with new structure used before evaporator in refrigeration system can remove the vapor from the mixture and make evaporator compact by improving its heat exchange efficiency with the lower inlet quality. It also decreases evaporator pressure drop and reduces compressor work. The two pipes are placed symmetrically which makes each of them can be treated as inlet. It means when the fluids flow reverse, the separator performance will not be influence. Four samples with different geometry parameters are tested by experiment with different inlet quality (0.18-0.33), inlet mass flow rate (65-100kg/h). Compared with the experimental data, CFD simulation results show a good agreement. Eulerian multiphase model and Reynolds Stress Turbulence model are applied in the CFD simulation and obtained the inner flow field such as phase path lines, tangential velocity profiles and pressure and volume of fraction distribution contours. The separator body diameter (24, 36, 48mm) and inlet diameter (3.84, 4.8, 5.76mm) decide the maximum tangential velocity which results in the centrifugal force. The tangential velocity profiles are simulated and compared among different models. The higher tangential velocity makes higher quality of gas outlet but high pressure drop at the same time. Decreasing the inlet diameter increases quality of gas outlet pipe and pressure drop. High gas outlet quality is cost at high pressure drop. Increasing of separator diameter makes gas outlet quality increase first and then decrease but the pressure drop decreases all the way. The offset (0, 2.4, 3.6mm) of gas outlet is an insensitive factor which influences the quality and pressure drop little.

  15. Alternative acceptance criteria of girth weld defects in cross country pipelines. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Denys, R.M.; Lefevre, T.

    1997-06-01

    The failure behaviour of defective girth welds in large diameter pipe lines was assessed using radiographic and mechanised ultrasonic inspection, small scale (tensile, hardness, Charpy and CTOD) and wide plate tests. The specimens were taken from girth welds in API 5LX70 pipe of 1219 mm (48 inches) in diameter by 8,0 mm (0,323 inch) and 13,3 mm (0,524 inch) wall. The test welds were made with the SMAW (8 welds) and GMAW (9 welds) welding processes. Upon completion of the non-destructive tests, 96 curved wide plate specimens were tested to destruction under tensile load. Testing was performed at low temperaturemore » (-50{degrees}C/-58{degrees}F). Defect type, defect position and size were determined from photographs of the fracture face and macro sections (defect characterisation and sizing). In total, 290 typical surface breaking and embedded defects in SMAW or GMAW girth welds have been evaluated. The vast majority of these defects were grossly out of tolerance with respect to current weld quality (workmanship) acceptance levels. To allow the defect tolerance to be determined, the failure strains and stresses were correlated with a defect length determined for an equivalent 3 mm (0, 118 inch) deep defect. This target depth was chosen to represent the average height of one weld pass. The results of this approach have been compared to wall thickness, current workmanship and the EPRG Tier 2 defect limit for planar defects. The defect lengths were derived for rectangular, parabolic and elliptical defect representations.« less

  16. Fired heater for coal liquefaction process

    DOEpatents

    Ying, David H. S.; McDermott, Wayne T.; Givens, Edwin N.

    1985-01-01

    A fired heater for a coal liquefaction process is operated under conditions to maximize the slurry slug frequency and thereby improve the heat transfer efficiency. The operating conditions controlled are (1) the pipe diameter and pipe arrangement, (2) the minimum coal/solvent slurry velocity, (3) the maximum gas superficial velocity, and (4) the range of the volumetric flow velocity ratio of gas to coal/solvent slurry.

  17. The rotating heat pipe - Implementation as a uniform-temperature heat source

    NASA Astrophysics Data System (ADS)

    Limoges, R. F.

    1981-11-01

    A wickless rotating heat pipe, if properly controlled, is a uniform heat source. The data presented are based on work done with 12.7 cm diameter x 76 cm long rotating heat pipes operating between 120 and 140 C. The major areas reviewed are: materials of fabrication, working fluids, sealing, temperature control, heaters, and safety. The optimum rotating heat pipe defined by these studies is fabricated of type 304 stainless steel, uses water as the working fluid, is sealed with welded joints, and utilizes a pressure switch and a fast-response quartz lamp for temperature control. Surface-temperature control of + or - 0.15 C and temperature uniformity within 0.8 C are obtained. Results of experiments designed to study the effects of hydrogen in the enclosed volume of the heat pipe are presented.

  18. PERFORMANCE EVALUATION OF AN INNOVATIVE FIBER REINFORCED GEOPOLYMER SPRAY-APPLIED MORTAR FOR LARGE DIAMETER WASTEWATER MAIN REHABILITATION IN HOUSTON, TX

    EPA Science Inventory

    This report describes the performance evaluation of a fiber reinforced geopolymer spray-applied mortar, which has potential as a structural alternative to traditional open cut techniques used in large-diameter sewer pipes. Geopolymer is a sustainable green material that incorpor...

  19. Heat transfer in pipes

    NASA Technical Reports Server (NTRS)

    Burbach, T.

    1985-01-01

    The heat transfer from hot water to a cold copper pipe in laminar and turbulent flow condition is determined. The mean flow through velocity in the pipe, relative test length and initial temperature in the vessel were varied extensively during tests. Measurements confirm Nusselt's theory for large test lengths in laminar range. A new equation is derived for heat transfer for large starting lengths which agrees satisfactorily with measurements for large starting lengths. Test results are compared with the new Prandtl equation for heat transfer and correlated well. Test material for 200- and to 400-diameter test length is represented at four different vessel temperatures.

  20. Improved Ultrasonic Fuel Mass Flowmeter for Army Aircraft Engine Diagnostics

    DTIC Science & Technology

    1975-06-01

    B-6), at least for large pipes , with diameters from ~0, 2 m to over 1 m. See Refs. 3-7. For area-averaging over a limited range of flow...u l a r c r o s s section. Sheet -meta l duct can be instal led to operate at hydrosta t ic p r e s s u r e within pipes of normal or heavy...practical limit is on the order of 1/4 of the pipe radius. To avoid this limit , and at the same time obtain propagation over a path independent of

  1. 75 FR 42738 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-16-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Mid-Atlantic Connector Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting July 15, 2010. The...

  2. 78 FR 33403 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-5-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Leidy Southeast Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal...

  3. Vibrational fatigue failures in short cantilevered piping with socket-welding fittings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, J.K.

    1996-12-01

    Approximately 80% of the vibrational fatigue failures in nuclear power plants have been caused by high cycle vibrational fatigue. Many of these failures have occurred in short, small bore (2 in. nominal diameter and smaller), unbraced, cantilevered piping with socket-welding fittings. The fatigue failures initiated in the socket welds. These failures have been unexpected, and have caused costly, unscheduled outages in some cases. In order to reduce the number of vibrational fatigue failures in these short cantilevered pipes, an acceleration based vibrational fatigue screening criteria was developed under Electric Power Research Institute (EPRI) sponsorship. In this paper, the acceleration basedmore » criteria will be compared to the results obtained from detailed dynamic modeling of a short, cantilevered pipe.« less

  4. 33 CFR 127.1101 - Piping systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...

  5. 33 CFR 127.1101 - Piping systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...

  6. 33 CFR 127.1101 - Piping systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...

  7. 33 CFR 127.1101 - Piping systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...

  8. 33 CFR 127.1101 - Piping systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1101 Piping systems... following criteria: (a) Each system must be designed and constructed in accordance with ASME B31.3. (b) Each... the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer...

  9. 46 CFR 151.50-79 - Methyl acetylene-propadiene mixture.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... suction line. (c) The piping system, including the cargo refrigeration system, for tanks to be loaded with methyl acetylene-propadiene mixture must be completely separate from piping and refrigeration systems for other tanks. If the piping system for the tanks to be loaded with methyl acetylene-propadiene mixture is...

  10. 46 CFR 151.50-79 - Methyl acetylene-propadiene mixture.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... suction line. (c) The piping system, including the cargo refrigeration system, for tanks to be loaded with methyl acetylene-propadiene mixture must be completely separate from piping and refrigeration systems for other tanks. If the piping system for the tanks to be loaded with methyl acetylene-propadiene mixture is...

  11. 49 CFR 192.328 - Additional construction requirements for steel pipe using alternative maximum allowable operating...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Additional construction requirements for steel pipe using alternative maximum allowable operating pressure. 192.328 Section 192.328 Transportation... Lines and Mains § 192.328 Additional construction requirements for steel pipe using alternative maximum...

  12. 49 CFR 192.328 - Additional construction requirements for steel pipe using alternative maximum allowable operating...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Additional construction requirements for steel pipe using alternative maximum allowable operating pressure. 192.328 Section 192.328 Transportation... Lines and Mains § 192.328 Additional construction requirements for steel pipe using alternative maximum...

  13. Mediterranean report/heated pipeline offloads tankers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-08-01

    The first heated submarine pipeline in Europe, according to Anonima Petroli Italiana, is now in operation from their Falconara Refinery near Ancona, Italy, to an existing offshore loading facility. The 3850 m long, 24 inch wide line, laid on the seabottom at 3-14 m depths, was built to offload high pour/high viscosity crudes requiring a minimum constant discharge temperature of 45-65 C. Four 3.5 mm heating pipes (three operating and one spare) were stretch-welded to the outside of the line at 45 degree angles to each other; they are heated at about 100 m/m by a parasitic current formed onmore » the pipe while 1500 volt current is passed through a cable inside the pipe. The heating system is equipped with an electric feeding installation, automatic power regulation, and remote sensors applied along the sea line. The heating pipes were protected with a coat of epoxy tar paint, a 50 mm thick and 70 kg/cm dense sprayed-on urethane foam coat, a sheath of butyric elastomer covered with an adhering 3 mm coat of polyethylene, and a concrete coat for protection and weighting. Specially designed water stops were placed at both ends of every line section under the waterproofing. Industria Construzioni Opere Publiche prefabricated the line on shore and laid it from shore.« less

  14. Visualization of Flow in Pressurizer Spray Line Piping and Estimation of Thermal Stress Fluctuation Caused by Swaying of Water Surface

    NASA Astrophysics Data System (ADS)

    Oumaya, Toru; Nakamura, Akira; Onojima, Daisuke; Takenaka, Nobuyuki

    The pressurizer spray line of PWR plants cools reactor coolant by injecting water into pressurizer. Since the continuous spray flow rate during commercial operation of the plant is considered insufficient to fill the pipe completely, there is a concern that a water surface exists in the pipe and may periodically sway. In order to identify the flow regimes in spray line piping and assess their impact on pipe structure, a flow visualization experiment was conducted. In the experiment, air was used substituted for steam to simulate the gas phase of the pressurizer, and the flow instability causing swaying without condensation was investigated. With a full-scale mock-up made of acrylic, flow under room temperature and atmospheric pressure conditions was visualized, and possible flow regimes were identified based on the results of the experiment. Three representative patterns of swaying of water surface were assumed, and the range of thermal stress fluctuation, when the surface swayed instantaneously, was calculated. With the three patterns of swaying assumed based on the visualization experiment, it was confirmed that the thermal stress amplitude would not exceed the fatigue endurance limit prescribed in the Japanese Design and Construction Code.

  15. On the calculation of turbulent heat transport downstream from an abrupt pipe expansion

    NASA Technical Reports Server (NTRS)

    Chieng, C. C.; Launder, B. E.

    1980-01-01

    A numerical study of flow and heat transfer in the separated flow region produced by an abrupt pipe explosion is reported, with emphasis on the region in the immediate vicinity of the wall where turbulent transport gives way to molecular conduction and diffusion. The analysis is based on a modified TEACH-2E program with the standard k-epsilon model of turbulence. Predictions of the experimental data of Zemanick and Dougall (1970) for a diameter ratio of 0.54 show generally encouraging agreement with experiment. At a diameter ratio of 0.43 different trends are discernable between measurement and calculation, though this appears to be due to effects unconnected with the wall region studied here.

  16. Insights Gained from Ultrasonic Testing of Piping Welds Subjected to the Mechanical Stress Improvement Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, Michael T.; Cinson, Anthony D.; Crawford, Susan L.

    2010-12-01

    Pacific Northwest National Laboratory (PNNL) is assisting the United States Nuclear Regulatory Commission (NRC) in developing a position on the management of primary water stress corrosion cracking (PWSCC) in leak-before-break piping systems. Part of this involves determining whether inspections alone, or inspections plus mitigation, are needed. This work addresses the reliability of ultrasonic testing (UT) of cracks that have been mitigated by the mechanical stress improvement process (MSIP). The MSIP has been approved by the NRC (NUREG-0313) since 1986 and modifies residual stresses remaining after welding with compressive, or neutral, stresses near the inner diameter surface of the pipe. Thismore » compressive stress is thought to arrest existing cracks and inhibit new crack formation. To evaluate the effectiveness of the MSIP and the reliability of ultrasonic inspections, flaws were evaluated both before and after MSIP application. An initial investigation was based on data acquired from cracked areas in 325-mm-diameter piping at the Ignalina Nuclear Power Plant (INPP) in Lithuania. In a follow-on exercise, PNNL acquired and evaluated similar UT data from a dissimilar metal weld (DMW) specimen containing implanted thermal fatigue cracks. The DMW specimen is a carbon steel nozzle-to-safe end-to-stainless steel pipe section that simulates a pressurizer surge nozzle. The flaws were implanted in the nozzle-to-safe end Alloy 82/182 butter region. Results are presented on the effects of MSIP on specimen surfaces, and on UT flaw responses.« less

  17. Reconstruction of gas distribution pipelines in MOZG in Poland using PE and PA pipes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borowicz, W.; Podziemski, T.; Kramek, E.

    1996-12-31

    MOZG--Warsaw Regional Gas Distribution Company was established in 1856. Now it is one of six gas distribution companies in Poland. Due to steadily increasing safety demands, some of the pipelines will need reconstruction. The majority of the substandard piping is located in urban areas. The company wanted to gain experiences in applying reconstruction technologies using two different plastic materials polyethylene and polyamide. They also wanted to assess the technical and economic practicalities of performing relining processes. A PE project--large diameter polyethylene relining (450 mm) conducted in Warsaw in 1994/95 and PA projects--relining using polyamide pipes, projects conducted in Radom andmore » in Warsaw during 1993 and 1994 are the most interesting and representative for this kind of works. Thanks to the experience obtained whilst carrying out these projects, reconstruction of old gas pipelines has become routine. Now they often use polyethylene relining of smaller diameters and they continue both construction and reconstruction of gas network using PA pipes. This paper presents the accumulated knowledge showing the advantages and disadvantages of applied methods. It describes project design and implementation with details and reports on the necessary preparation work, on site job organization and the most common problems arising during the construction works.« less

  18. Numerical study of heat and mass transfer in inertial suspensions in pipes.

    NASA Astrophysics Data System (ADS)

    Niazi Ardekani, Mehdi; Brandt, Luca

    2017-11-01

    Controlling heat and mass transfer in particulate suspensions has many important applications such as packed and fluidized bed reactors and industrial dryers. In this work, we study the heat and mass transfer within a suspension of spherical particles in a laminar pipe flow, using the immersed boundary method (IBM) to account for the solid fluid interactions and a volume of fluid (VoF) method to resolve temperature equation both inside and outside of the particles. Tracers that follow the fluid streamlines are considered to investigate mass transfer within the suspension. Different particle volume fractions 5, 15, 30 and 40% are simulated for different pipe to particle diameter ratios: 5, 10 and 15. The preliminary results quantify the heat and mass transfer enhancement with respect to a single-phase laminar pipe flow. We show in particular that the heat transfer from the wall saturates for volume fractions more than 30%, however at high particle Reynolds numbers (small diameter ratios) the heat transfer continues to increase. Regarding the dispersion of tracer particles we show that the diffusivity of tracers increases with volume fraction in radial and stream-wise directions however it goes through a peak at 15% in the azimuthal direction. European Research Council, Grant No. ERC-2013-CoG- 616186, TRITOS; SNIC (the Swedish National Infrastructure for Computing).

  19. Modal content of noise generated by a coaxial jet in a pipe

    NASA Technical Reports Server (NTRS)

    Kerschen, E. J.; Johnston, J. P.

    1978-01-01

    Noise generated by air flow through a coaxial obstruction in a long, straight pipe was investigated with concentration on the modal characteristics of the noise field inside the pipe and downstream of the restriction. Two measurement techniques were developed for separation of the noise into the acoustic duct modes. The instantaneous mode separation technique uses four microphones, equally spaced in the circumferential direction, at the same axial location. The time-averaged mode separation technique uses three microphones mounted at the same axial location. A matrix operation on time-averaged data produces the modal pressure levels. This technique requires the restrictive assumption that the acoustic modes are uncorrelated with each other. The measured modal pressure spectra were converted to modal power spectra and integrated over the frequency range 200-6000 Hz. The acoustic efficiency levels (acoustic power normalized by jet kinetic energy flow), when plotted vs. jet Mach number, showed a strong dependence on the ratio of restriction diameter to pipe diameter. The acoustic energy flow analyses based on the thermodynamic energy equation and on the results of Mohring both resulted in orthogonality properties for the eigenfunctions of the radial mode shape equation. These orthogonality relationships involve the eigenvalues and derivatives of the radial mode shape functions.

  20. Flow behaviour and structure of heterogeneous particles-water mixture in horizontal and inclined pipes

    NASA Astrophysics Data System (ADS)

    Vlasák, Pavel; Chára, Zdeněk; Konfršt, Jiří

    2018-06-01

    The effect of slurry velocity and mean concentration of heterogeneous particle-water mixture on flow behaviour and structure in the turbulent regime was studied in horizontal and inclined pipe sections of inner diameter D = 100 mm. The stratified flow pattern of heterogeneous particle-water mixture in the inclined pipe sections was revealed. The particles moved mostly near to the pipe invert. Concentration distribution in ascending and descending vertical pipe sections confirmed the effect of fall velocity on particle-carrier liquid slip velocity and increase of in situ concentration in the ascending pipe section. Slip velocity in two-phase flow, which is defined as the velocity difference between the solid and liquid phase, is one of mechanism of particle movement in two-phase flow. Due to the slip velocity, there is difference between transport and in situ concentrations, and the slip velocity can be determined from comparison of the in situ and transport concentration. For heterogeneous particle-water mixture flow the slip velocity depends on the flow structure.

  1. Pipe crawler with extendable legs

    DOEpatents

    Zollinger, William T.

    1992-01-01

    A pipe crawler for moving through a pipe in inchworm fashion having front and rear leg assemblies separated by air cylinders to increase and decrease the spacing between assemblies. Each leg of the four legs of an assembly is moved between a wall-engaging, extended position and a retracted position by a separate air cylinder. The air cylinders of the leg assemblies are preferably arranged in pairs of oppositely directed cylinders with no pair lying in the same axial plane as another pair. Therefore, the cylinders can be as long a leg assembly is wide and the crawler can crawl through sections of pipes where the diameter is twice that of other sections. The crawler carries a valving system, a manifold to distribute air supplied by a single umbilical air hose to the various air cylinders in a sequence controlled electrically by a controller. The crawler also utilizes a rolling mechanism, casters in this case, to reduce friction between the crawler and pipe wall thereby further extending the range of the pipe crawler.

  2. Pipe crawler with extendable legs

    DOEpatents

    Zollinger, W.T.

    1992-06-16

    A pipe crawler for moving through a pipe in inchworm fashion having front and rear leg assemblies separated by air cylinders to increase and decrease the spacing between assemblies. Each leg of the four legs of an assembly is moved between a wall-engaging, extended position and a retracted position by a separate air cylinder. The air cylinders of the leg assemblies are preferably arranged in pairs of oppositely directed cylinders with no pair lying in the same axial plane as another pair. Therefore, the cylinders can be as long as a leg assembly is wide and the crawler can crawl through sections of pipes where the diameter is twice that of other sections. The crawler carries a valving system, a manifold to distribute air supplied by a single umbilical air hose to the various air cylinders in a sequence controlled electrically by a controller. The crawler also utilizes a rolling mechanism, casters in this case, to reduce friction between the crawler and pipe wall thereby further extending the range of the pipe crawler. 8 figs.

  3. Assessment of NDE Methods to Detect Lack of Fusion in HDPE Butt Fusion Joints

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, Susan L.; Doctor, Steven R.; Cinson, Anthony D.

    2011-07-31

    Studies at the Pacific Northwest National Laboratory (PNNL) in Richland, Washington, were conducted to evaluate nondestructive examinations (NDE) coupled with mechanical testing of butt fusion joints in high-density polyethylene (HDPE) pipe for assessing lack of fusion. The work provided information to the United States Nuclear Regulatory Commission (NRC) on the effectiveness of volumetric inspection techniques of HDPE butt fusion joints in Section III, Division 1, Class 3, buried piping systems in nuclear power plants. This paper describes results from assessments using ultrasonic and microwave nondestructive techniques and mechanical testing with the high-speed tensile impact test and the side-bend test formore » determining joint integrity. A series of butt joints were fabricated in 3408, 12-inch (30.5-cm) IPS DR-11 HDPE material by varying the fusion parameters to create good joints and joints containing a range of lack-of-fusion conditions. Six of these butt joints were volumetrically examined with time-of-flight diffraction (TOFD), phased-array (PA) ultrasound, and the Evisive microwave system. The outer diameter (OD) weld beads were removed for microwave evaluation and the pipes ultrasonically re-evaluated. In two of the six pipes, both the outer and inner diameter (ID) weld beads were removed and the pipe joints re-evaluated. Some of the pipes were sectioned and the joints destructively evaluated with the high-speed tensile test and the side-bend test. The fusion parameters, nondestructive and destructive evaluation results have been correlated to validate the effectiveness of what each NDE technology detects and what each does not detect. There was no single NDE method that detected all of the lack-of-fusion flaws but a combination of NDE methods did detect most of the flaws.« less

  4. Strain corrosion cracking in rpm sewer piping

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hopkins, S.W.; Wachob, H.F.; Duffner, D.H.

    1993-12-31

    Long term, aggressive environmental exposure can result in localized failure of large diameter, glass reinforced plastic mortar (RPM) piping. In order to evaluate the performance of the liner and glass reinforced matrix polyester resin, accelerated strain corrosion tests were performed on samples of RPM piping that had already experienced almost 15 years of service. To assess the sensitivity of RPM pipe to acidic environments and to correlate the fractography of the laboratory produced failures with the excavated crack, short segments of 8-inch and 48-inch diameter piping were statically loaded to produce various known surface strains. After preloading the specimens tomore » fixed strain levels, these samples were then exposed to sulfuric acid solutions having pH values of 2.7 and 4.7 and monitored as a function of time until failure. The resulting lifetimes were related to initial surface strains and showed a decreasing logarithmic relationship. Fractographic examination of the excavated crack revealed the typical strain corrosion fractography of glass fibers after almost a 1000 hour exposure at 1.3 % strain; similar fractographic observations were obtained from failed laboratory samples. At shorter times, failure appeared to be overload in nature and exhibited little, if any, timedependent fracture features. Fractographic examination of the excavated crack strongly indicated that the crack had been present for a significant time. The extremely aggressive environment had totally dissolved the exposed glass reinforcement. Based on the laboratory strain corrosion performance, the nature of the contained cracking, and fractography of the failed surface, cracking of the excavated RPM pipe was believed to be the result of an early overload failure that subsequently propagated slowly via strain corrosion in an extremely aggressive environment.« less

  5. 76 FR 40717 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-4-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Northeast Supply Link Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy...

  6. 77 FR 39695 - HollyFrontier Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-21-000] HollyFrontier Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint Take notice that on June 25...; 18 CFR 343.1(a) and 343.2(c), HollyFrontier Refining and Marketing LLC (Complainant) filed a formal...

  7. Microbiological corrosion of ASTM SA105 carbon steel pipe for industrial fire water usage

    NASA Astrophysics Data System (ADS)

    Chidambaram, S.; Ashok, K.; Karthik, V.; Venkatakrishnan, P. G.

    2018-02-01

    The large number of metallic systems developed for last few decades against both general uniform corrosion and localized corrosion. Among all microbiological induced corrosion (MIC) is attractive, multidisciplinary and complex in nature. Many chemical processing industries utilizes fresh water for fire service to nullify major/minor fire. One such fire water service line pipe attacked by micro-organisms leads to leakage which is industrially important from safety point of view. Also large numbers of leakage reported in similar fire water service of nearby food processing plant, paper & pulp plant, steel plant, electricity board etc…In present investigation one such industrial fire water service line failure analysis of carbon steel line pipe was analyzed to determine the cause of failure. The water sample subjected to various chemical and bacterial analyses. Turbidity, pH, calcium hardness, free chlorine, oxidation reduction potential, fungi, yeasts, sulphide reducing bacteria (SRB) and total bacteria (TB) were measured on water sample analysis. The corrosion rate was measured on steel samples and corrosion coupon measurements were installed in fire water for validating non flow assisted localized corrosion. The sulphide reducing bacteria (SRB) presents in fire water causes a localized micro biological corrosion attack of line pipe.

  8. Identification And Distribution Of Vanadinite (Pb5(V5+O4)3Cl) In Lead Pipe Corrosion By-Products

    EPA Science Inventory

    This study presents the first detailed look at vanadium (V) speciation in drinking water pipe corrosion scales. A pool of 34 scale layers from 15 lead or lead-lined pipes representing eight different municipal drinking water distribution systems in the Northeastern and Midwester...

  9. 68. VIEW OF WOOD STAVE PIPE TAKEN FROM THE TOP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    68. VIEW OF WOOD STAVE PIPE TAKEN FROM THE TOP OF THE PENSTOCK LINE, LOOKING SOUTH. PORTION OF PIPE BETWEEN THE FOREBAY AND RAILROAD TRACK WILL BE COVERED WITH CONCRETE CORE WALL AND EARTH EMBANKMENT OF RESERVOIR, Print No. 185, November 1903 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  10. Pulse mitigation and heat transfer enhancement techniques. Volume 3: Liquid sodium heat transfer facility and transient response of sodium heat pipe to pulse forward and reverse heat load

    NASA Astrophysics Data System (ADS)

    Chow, L. C.; Hahn, O. J.; Nguyen, H. X.

    1992-08-01

    This report presents the description of a liquid sodium heat transfer facility (sodium loop) constructed to support the study of transient response of heat pipes. The facility, consisting of the loop itself, a safety system, and a data acquisition system, can be safely operated over a wide range of temperature and sodium flow rate. The transient response of a heat pipe to pulse heat load at the condenser section was experimentally investigated. A 0.457 m screen wick, sodium heat pipe with an outer diameter of 0.127 m was tested under different heat loading conditions. A major finding was that the heat pipe reversed under a pulse heat load applied at the condenser. The time of reversal was approximately 15 to 25 seconds. The startup of the heat pipe from frozen state was also studied. It was found that during the startup process, at least part of the heat pipe was active. The active region extended gradually down to the end of the condenser until all of the working fluid in the heat pipe was molten.

  11. Transition to Turbulence in curved pipe

    NASA Astrophysics Data System (ADS)

    Hashemi, Amirreza; Loth, Francis

    2014-11-01

    Studies have shown that transitional turbulence in a curved pipe is delayed significantly compared with straight pipes. These analytical, numerical and experimental studies employed a helical geometry that is infinitely long such that the effect of the inlet and outlet can be neglected. The present study examined transition to turbulence in a finite curved pipe with a straight inlet/outlet and a 180 degrees curved pipe with a constant radius of curvature and diameter (D). We have employed the large scale direct numerical simulation (DNS) by using the spectral element method, nek5000, to simulate the flow field within curved pipe geometry with different curvature radii and Reynolds numbers to determine the point of the transition to turbulence. Long extensions for the inlet (5D) and outlet (20D) were used to diminish the effect of the boundary conditions. Our numerical results for radius of curvatures of 1.5D and 5D show transition turbulence is near Re = 3000. This is delayed compared with a straight pipe (Re = 2200) but still less that observed for helical geometries (Reynolds number less than 5000). Our research aims to describe the critical Reynolds number for transition to turbulence for a finite curved pipe at various curvature radii.

  12. Time Reversal Method for Pipe Inspection with Guided Wave

    NASA Astrophysics Data System (ADS)

    Deng, Fei; He, Cunfu; Wu, Bin

    2008-02-01

    The temporal-spatial focusing effect of the time reversal method on the guided wave inspection in pipes is investigated. A steel pipe model with outer diameter of 70 mm and wall thickness of 3.5 mm is numerically built to analyse the reflection coefficient of L(0,2) mode when the time reversal method is applied in the model. According to the calculated results, it is shown that a synthetic time reversal array method is effective to improve the signal-to-noise ratio of a guided wave inspection system. As an intercepting window is widened, more energy can be included in a re-emitted signal, which leads to a large reflection coefficient of L(0,2) mode. It is also shown that when a time reversed signal is reapplied in the pipe model, by analysing the motion of the time reversed wave propagating along the pipe model, a defect can be identified. Therefore, it is demonstrated that the time reversal method can be used to locate the circumferential position of a defect in a pipe. Finally, through an experiment corresponding with the pipe model, the experimental result shows that the above-mentioned method can be valid in the inspection of a pipe.

  13. Dual Tank Fuel System

    DOEpatents

    Wagner, Richard William; Burkhard, James Frank; Dauer, Kenneth John

    1999-11-16

    A dual tank fuel system has primary and secondary fuel tanks, with the primary tank including a filler pipe to receive fuel and a discharge line to deliver fuel to an engine, and with a balance pipe interconnecting the primary tank and the secondary tank. The balance pipe opens close to the bottom of each tank to direct fuel from the primary tank to the secondary tank as the primary tank is filled, and to direct fuel from the secondary tank to the primary tank as fuel is discharged from the primary tank through the discharge line. A vent line has branches connected to each tank to direct fuel vapor from the tanks as the tanks are filled, and to admit air to the tanks as fuel is delivered to the engine.

  14. Primary and Aggregate Size Distributions of PM in Tail Pipe Emissions form Diesel Engines

    NASA Astrophysics Data System (ADS)

    Arai, Masataka; Amagai, Kenji; Nakaji, Takayuki; Hayashi, Shinji

    Particulate matter (PM) emission exhausted from diesel engine should be reduced to keep the clean air environment. PM emission was considered that it consisted of coarse and aggregate particles, and nuclei-mode particles of which diameter was less than 50nm. However the detail characteristics about these particles of the PM were still unknown and they were needed for more physically accurate measurement and more effective reduction of exhaust PM emission. In this study, the size distributions of solid particles in PM emission were reported. PMs in the tail-pipe emission were sampled from three type diesel engines. Sampled PM was chemically treated to separate the solid carbon fraction from other fractions such as soluble organic fraction (SOF). The electron microscopic and optical-manual size measurement procedures were used to determine the size distribution of primary particles those were formed through coagulation process from nuclei-mode particles and consisted in aggregate particles. The centrifugal sedimentation method was applied to measure the Stokes diameter of dry-soot. Aerodynamic diameters of nano and aggregate particles were measured with scanning mobility particle sizer (SMPS). The peak aggregate diameters detected by SMPS were fallen in the same size regime as the Stokes diameter of dry-soot. Both of primary and Stokes diameters of dry-soot decreased with increases of engine speed and excess air ratio. Also, the effects of fuel properties and engine types on primary and aggregate particle diameters were discussed.

  15. U-PHOS Project: Development of a Large Diameter Pulsating Heat Pipe Experiment on board REXUS 22

    NASA Astrophysics Data System (ADS)

    Nannipieri, P.; Anichini, M.; Barsocchi, L.; Becatti, G.; Buoni, L.; Celi, F.; Catarsi, A.; Di Giorgio, P.; Fattibene, P.; Ferrato, E.; Guardati, P.; Mancini, E.; Meoni, G.; Nesti, F.; Piacquadio, S.; Pratelli, E.; Quadrelli, L.; Viglione, A. S.; Zanaboni, F.; Mameli, M.; Baronti, F.; Fanucci, L.; Marcuccio, S.; Bartoli, C.; Di Marco, P.; Bianco, N.; Marengo, M.; Filippeschi, S.

    2017-01-01

    U-PHOS Project aims at analysing and characterising the behaviour of a large diameter Pulsating Heat Pipe (PHP) on board REXUS 22 sounding rocket. A PHP is a passive thermal control device where the heat is efficiently transported by means of the self-sustained oscillatory fluid motion driven by the phase change phenomena. Since, in milli-gravity conditions, buoyancy forces become less intense, the PHP diameter may be increased still maintaining the slug/plug typical flow pattern. Consequently, the PHP heat power capability may be increased too. U-PHOS aims at proving that a large diameter PHP effectively works in milli-g conditions by characterizing its thermal response during a sounding rocket flight. The actual PHP tube is made of aluminum (3 mm inner diameter, filled with FC-72), heated at the evaporator by a compact electrical resistance, cooled at the condenser by a Phase Change Material (PCM) embedded in a metallic foam. The tube wall temperatures are recorded by means of Fibre Bragg Grating (FBG) sensors; the local fluid pressure is acquired by means of a pressure transducer. The present work intends to report the actual status of the project, focusing in particular on the experiment improvements with respect to the previous campaign.

  16. Apparatus and method for pulsed laser deposition of materials on wires and pipes

    DOEpatents

    Fernandez, Felix E.

    2003-01-01

    Methods and apparatuses are disclosed which allow uniform coatings to be applied by pulsed laser deposition (PLD) on inner and outer surfaces of cylindrical objects, such as rods, pipes, tubes, and wires. The use of PLD makes this technique particularly suitable for complex multicomponent materials, such as superconducting ceramics. Rigid objects of any length, i.e., pipes up to a few meters, and with diameters from less than 1 centimeter to over 10 centimeters can be coated using this technique. Further, deposition is effected simultaneously onto an annular region of the pipe wall. This particular arrangement simplifies the apparatus, reduces film uniformity control difficulties, and can result in faster operation cycles. In addition, flexible wires of any length can be continuously coated using the disclosed invention.

  17. Alternate high capacity heat pipe

    NASA Technical Reports Server (NTRS)

    Voss, F. E.

    1986-01-01

    The performance predictions for a fifty foot heat pipe (4 foot evaporator - 46 foot condensor) are discussed. These performance predictions are supported by experimental data for a four foot heat pipe. Both heat pipes have evaporators with axial groove wick structures and condensers with powder metal external artery wick structures. The predicted performance of a rectangular axial groove/external artery heat pipe operating in space is given. Heat transport versus groove width is plotted for 100, 200 and 300 grooves in the evaporator. The curves show that maximum power is achieved for groove widths from 0.040 to 0.053 as the number of grooves varies from 300 to 100. The corresponding range of maximum power is 3150 to 2400 watts. The relationships between groove width and heat pipe evaporate diameter for 100, 200 and 300 grooves in the evaporator are given. A four foot heat pipe having a three foot condenser and one foot evaporator was built and tested. The evaporator wick structure used axial grooves with rectangular cross sections, and the condenser wick structure used powder metal with an external artery configuration. Fabrication drawings are enclosed. The predicted and measured performance for this heat pipe is shown. The agreement between predicted and measured performance is good and therefore substantiates the predicted performance for a fifty foot heat pipe.

  18. Tests of cryogenic pigs for use in liquefied gas pipelines

    NASA Astrophysics Data System (ADS)

    Hipple, D. L.; Oneal, W. C.

    1982-09-01

    Pipeline pigs are a key element in the design of a proposed spill test facility whose purpose is to evaluate the hazards of large spills of liquefied gaseous fuels (LGFs). A long pipe runs from the LGF storage tanks to the spill point; to produce a rapid spill, the pipe is filled with LGF and a pig will be pneumatically driven through the pipe to force out the LGF quickly and cleanly. Several pig designs were tested in a 6 inch diameter, 420 foot long pipe to evaluate their performance at liquid-nitrogen temperature and compare it with their performance at ambient temperature. For each test, the pig was placed in one end of the pipe and either water or liquid nitrogen was put into the pipe in front of the pig. Then pressurized drive gas, either nitrogen or helium, was admitted to the pipe behind the pig to push the pig and the fluid ahead of it out the exit nozzle. For some tests, the drive gas supply was shut off when the pig was part way through the pipe as a method of velocity control; in these cases, the pressurized gas trapped behind the pig continued to expand until it pushed the pig the remaining distance out of the pipe.

  19. Numerical Investigation of Ice Slurry Flow in a Horizontal Pipe

    NASA Astrophysics Data System (ADS)

    Rawat, K. S.; Pratihar, A. K.

    2018-02-01

    In the last decade, phase changing material slurry (PCMS) gained much attention as a cooling medium due to its high energy storage capacity and transportability. However the flow of PCM slurry is a complex phenomenon as it affected by various parameters, i.e. fluid properties, velocity, particle size and concentration etc.. In the present work ice is used as a PCM and numerical investigation of heterogeneous slurry flow has been carried out using Eulerian KTGF model in a horizontal pipe. Firstly the present model is validated with existing experiment results available in the literature, and then model is applied to the present problem. Results show that, flow is almost homogeneous for ethanol based ice slurry with particle diameter of 0.1 mm at the velocity of 1 m/s. It is also found that ice particle distribution is more uniform at higher velocity, concentration of ice and ethanol in slurry. Results also show that ice concentration increases on the top of the pipe, and the effect of particle wall collision is more significant at higher particle diameter.

  20. Effect of using acetone and distilled water on the performance of open loop pulsating heat pipe (OLPHP) with different filling ratios

    NASA Astrophysics Data System (ADS)

    Rahman, Md. Lutfor; Afrose, Tonima; Tahmina, Halima Khatun; Rinky, Rumana Parvin; Ali, Mohammad

    2016-07-01

    Pulsating heat pipe (PHP) is a new innovation in the modern era of miniaturizes thermal management system for its higher heating and cooling capacity. The objective of this experiment is to observe the performance of open loop pulsating heat pipe using two fluids at different filling ratios. This OLPHP is a copper capillary tube of 2.5mm outer diameter and 2mm inner diameter. It consists of 8 loops where the evaporative section is 50mm, adiabatic section is 120mm and condensation section is 80mm. The experiment is conducted with distilled water and acetone at 40%, 50%, 60%, and 70% filling ratios where 0° (vertical) is considered as definite angle of inclination. Distilled water and acetone are selected as working fluids considering their different latent heat of vaporization and surface tension. It is found that acetone shows lower thermal resistance than water at all heat inputs. Best performance of acetone is attained at 70% filling ratio. Water displays better heat transfer capability at 50% filling ratio.

  1. Rotating optical geometry sensor for inner pipe-surface reconstruction

    NASA Astrophysics Data System (ADS)

    Ritter, Moritz; Frey, Christan W.

    2010-01-01

    The inspection of sewer or fresh water pipes is usually carried out by a remotely controlled inspection vehicle equipped with a high resolution camera and a lightning system. This operator-oriented approach based on offline analysis of the recorded images is highly subjective and prone to errors. Beside the subjective classification of pipe defects through the operator standard closed circuit television (CCTV) technology is not suitable for detecting geometrical deformations resulting from e.g. structural mechanical weakness of the pipe, corrosion of e.g. cast-iron material or sedimentations. At Fraunhofer Institute of Optronics, System Technologies and Image Exploitation (IOSB) in Karlsruhe, Germany, a new Rotating Optical Geometry Sensor (ROGS) for pipe inspection has been developed which is capable of measuring the inner pipe geometry very precisely over the whole pipe length. This paper describes the developed ROGS system and the online adaption strategy for choosing the optimal system parameters. These parameters are the rotation and traveling speed dependent from the pipe diameter. Furthermore, a practicable calibration methodology is presented which guarantees an identification of the several internal sensor parameters. ROGS has been integrated in two different systems: A rod based system for small fresh water pipes and a standard inspection vehicle based system for large sewer Pipes. These systems have been successfully applied to different pipe systems. With this measurement method the geometric information can be used efficiently for an objective repeatable quality evaluation. Results and experiences in the area of fresh water pipe inspection will be presented.

  2. 49 CFR 195.12 - What requirements apply to low-stress pipelines in rural areas?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... corresponding to: (A) A stress level equal to or less than 20-percent of the specified minimum yield strength of the line pipe; or (B) If the stress level is unknown or the pipeline is not constructed with steel... of the specified minimum yield strength of the line pipe; or (B) If the stress level is unknown or...

  3. 49 CFR 195.12 - What requirements apply to low-stress pipelines in rural areas?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... corresponding to: (A) A stress level equal to or less than 20-percent of the specified minimum yield strength of the line pipe; or (B) If the stress level is unknown or the pipeline is not constructed with steel... of the specified minimum yield strength of the line pipe; or (B) If the stress level is unknown or...

  4. 49 CFR 195.12 - What requirements apply to low-stress pipelines in rural areas?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... corresponding to: (A) A stress level equal to or less than 20-percent of the specified minimum yield strength of the line pipe; or (B) If the stress level is unknown or the pipeline is not constructed with steel... of the specified minimum yield strength of the line pipe; or (B) If the stress level is unknown or...

  5. Fast closing valve

    DOEpatents

    Hanson, Clark L.

    1984-01-10

    A valve is provided for protecting the high vacuum of a particle accelera in the event of air leakage, wherein the valve provides an axially symmetrical passage to avoid disturbance of the partical beam during normal operation, and yet enables very rapid and tight closure of the beam-carrying pipe in the event of air leakage. The valve includes a ball member (30) which can rotate between a first position wherein a bore (32) in the member is aligned with the beam pipe, and a second position out of line with the pipe. A seal member (38) is flexibly sealed to the pipe, and has a seal end which can move tightly against the ball member after the bore has rotated out of line with the pipe, to thereby assure that the seal member does not retard rapid rotation of the ball valve member. The ball valve member can be rapidly rotated by a conductive arm (40) fixed to it and which is rotated by the discharge of a capacitor bank through coils (44, 45) located adjacent to the arm.

  6. 46 CFR 182.510 - Bilge piping system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... feet) in length must be not less than 40 millimeters (1.5 inches) nominal pipe size. A bilge suction... meters (26 feet) in length must be provided with individual bilge lines and bilge suctions for each... provided. (b) A bilge pipe in a vessel of not more than 19.8 meters (65 feet) in length must be not less...

  7. 46 CFR 182.510 - Bilge piping system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... feet) in length must be not less than 40 millimeters (1.5 inches) nominal pipe size. A bilge suction... meters (26 feet) in length must be provided with individual bilge lines and bilge suctions for each... provided. (b) A bilge pipe in a vessel of not more than 19.8 meters (65 feet) in length must be not less...

  8. 49 CFR 179.400-17 - Inner tank piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... vapor space of the inner tank to facilitate unloading the liquid lading must be approved. [Amdt. 179-32... Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.400-17 Inner tank piping. (a) Product lines. The piping system for vapor and liquid phase transfer and venting must be made for...

  9. 49 CFR 179.400-17 - Inner tank piping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... vapor space of the inner tank to facilitate unloading the liquid lading must be approved. [Amdt. 179-32... Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.400-17 Inner tank piping. (a) Product lines. The piping system for vapor and liquid phase transfer and venting must be made for...

  10. 49 CFR 179.400-17 - Inner tank piping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... vapor space of the inner tank to facilitate unloading the liquid lading must be approved. [Amdt. 179-32... Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.400-17 Inner tank piping. (a) Product lines. The piping system for vapor and liquid phase transfer and venting must be made for...

  11. RDX/HMX Plant Design

    DTIC Science & Technology

    1981-05-01

    coating process in Explosives Manufacturing Line 2. The end products of the initial design effort are process flow diagrams, piping and...instrumentation diagrams, motor control schedules, interlock logic diagrams, piping installation drawings, typical instrument Installation details, equipment...structures, equipment, utilities, and process piping extending 1.5 m (5 ft) beyond the building or area were not included in the scope of work. Nitrolysis

  12. Theoretical study on bubble formation and flow condensation in downflow channel with horizontal gas injection

    NASA Astrophysics Data System (ADS)

    Zhu, Kang; Li, Yanzhong; Wang, Jiaojiao; Ma, Yuan; Wang, Lei; Xie, Fushou

    2018-05-01

    Bubble formation and condensation in liquid pipes occur widely in industrial systems such as cryogenic propellant feeding system. In this paper, an integrated theoretical model is established to give a comprehensive description of the bubble formation, motion and condensation process. The model is validated by numerical simulations and bubble condensation experiments from references, and good agreements are achieved. The bubble departure diameter at the orifice and the flow condensation length in the liquid channel are predicted by the model, and effects of various influencing parameters on bubble behaviors are analyzed. Prediction results indicate that the orifice diameter, the gas feeding rate, and the liquid velocity are the primary influence factors on the bubble departure diameter. The interfacial heat transfer as well as the bubble departure diameter has a direct impact on the bubble flow condensation length, which increases by 2.5 times over a system pressure range of 0.1 0.4 MPa, and decreases by 85% over a liquid subcooling range of 5 30 K. This work could be beneficial to the prediction of bubble formation and flow condensation processes and the design of cryogenic transfer pipes.

  13. Manual for Calculating the Seepage Strength of Earthfill Dams,

    DTIC Science & Technology

    1976-07-01

    gravity of material of soil particles; d--diameter of soil particles; dio...d 17 ...dsr-diameters of soil particles, the smallest of which in its...compcsition may be present as 10... 17 ...60% by weight; dci--diameter of (piping) particles of soil which may be carried away by the seepage flow; -dso Y1 d...should, however, be reduced, assuming: k" onnfrmsi S(Jk)dnonuniform soil = [(Jk)d]uniform soil ( 17 ) where 7is the coefficient of reduction (less than

  14. 46 CFR 56.50-70 - Gasoline fuel systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (1) Fuel supply piping to the engines shall be of seamless drawn annealed copper pipe or tubing... sharp edges. Where passing through steel decks or bulkheads, fuel lines shall be protected by close...

  15. 46 CFR 56.50-70 - Gasoline fuel systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (1) Fuel supply piping to the engines shall be of seamless drawn annealed copper pipe or tubing... sharp edges. Where passing through steel decks or bulkheads, fuel lines shall be protected by close...

  16. 46 CFR 56.50-70 - Gasoline fuel systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (1) Fuel supply piping to the engines shall be of seamless drawn annealed copper pipe or tubing... sharp edges. Where passing through steel decks or bulkheads, fuel lines shall be protected by close...

  17. 46 CFR 56.50-70 - Gasoline fuel systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (1) Fuel supply piping to the engines shall be of seamless drawn annealed copper pipe or tubing... sharp edges. Where passing through steel decks or bulkheads, fuel lines shall be protected by close...

  18. 46 CFR 56.50-70 - Gasoline fuel systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (1) Fuel supply piping to the engines shall be of seamless drawn annealed copper pipe or tubing... sharp edges. Where passing through steel decks or bulkheads, fuel lines shall be protected by close...

  19. Steel Fibers Reinforced Concrete Pipes - Experimental Tests and Numerical Simulation

    NASA Astrophysics Data System (ADS)

    Doru, Zdrenghea

    2017-10-01

    The paper presents in the first part a state of the art review of reinforced concrete pipes used in micro tunnelling realised through pipes jacking method and design methods for steel fibres reinforced concrete. In part two experimental tests are presented on inner pipes with diameters of 1410mm and 2200mm, and specimens (100x100x500mm) of reinforced concrete with metal fibres (35 kg / m3). In part two experimental tests are presented on pipes with inner diameters of 1410mm and 2200mm, and specimens (100x100x500mm) of reinforced concrete with steel fibres (35 kg / m3). The results obtained are analysed and are calculated residual flexural tensile strengths which characterise the post-cracking behaviour of steel fibres reinforced concrete. In the third part are presented numerical simulations of the tests of pipes and specimens. The model adopted for the pipes test was a three-dimensional model and loads considered were those obtained in experimental tests at reaching breaking forces. Tensile stresses determined were compared with mean flexural tensile strength. To validate tensile parameters of steel fibres reinforced concrete, experimental tests of the specimens were modelled with MIDAS program to reproduce the flexural breaking behaviour. To simulate post - cracking behaviour was used the method σ — ε based on the relationship stress - strain, according to RILEM TC 162-TDF. For the specimens tested were plotted F — δ diagrams, which have been superimposed for comparison with the similar diagrams of experimental tests. The comparison of experimental results with those obtained from numerical simulation leads to the following conclusions: - the maximum forces obtained by numerical calculation have higher values than the experimental values for the same tensile stresses; - forces corresponding of residual strengths have very similar values between the experimental and numerical calculations; - generally the numerical model estimates a breaking force greater than that obtained in the experimental tests. Experimental and numerical studies are used to establish the residual characteristic flexural tensile strength minimum guaranteed and limits of applicability of concrete pipes reinforced with steel fibres used in various field and loading situations.

  20. Impact of treatment on Pb release from full and partially replaced harvested Lead Service Lines (LSLs).

    PubMed

    Cartier, Clément; Doré, Evelyne; Laroche, Laurent; Nour, Shokoufeh; Edwards, Marc; Prévost, Michèle

    2013-02-01

    Release of lead from 80% partially replaced service lines was compared to full lead service lines using harvested-stabilized lead pipes and field brass connectors. After more than a year of stabilization, lead release was consistent with field samples. Over the relatively short duration partial replacement of lead pipe by copper pipe (3 months), generated high lead release, attributed to galvanic corrosion, resulting in a final outcome for lead release that was even worse than for a full lead pipe. Increased lead release was especially evident at higher flow rates. Orthophosphate reduced lead release from full lead pipes by 64%. For partially replaced samples with copper, lead concentrations were unchanged by phosphate dosing at moderate flow (103 ± 265 vs 169 ± 349 μg/L) and were increased to very high levels when sampled at high flow rates (1001 ± 1808 vs 257 ± 224 μg/L). The increase lead release was in the form of particulate lead (>90%). In comparison to the condition without treatment, increased sulfate treatment had little impact on lead release from 100%-Pb rigs but reduced lead release from partially replaced lead pipes with copper. Our results also raise questions concerning protocols based on short 30 min stagnation (as those used in Canada) due to their incapacity to consider particulate lead release generated mostly after longer stagnation. Copyright © 2012 Elsevier Ltd. All rights reserved.

  1. Heat extraction from salinity-gradient solar ponds using heat pipe heat exchangers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tundee, Sura; Terdtoon, Pradit; Sakulchangsatjatai, Phrut

    This paper presents the results of experimental and theoretical analysis on the heat extraction process from solar pond by using the heat pipe heat exchanger. In order to conduct research work, a small scale experimental solar pond with an area of 7.0 m{sup 2} and a depth of 1.5 m was built at Khon Kaen in North-Eastern Thailand (16 27'N102 E). Heat was successfully extracted from the lower convective zone (LCZ) of the solar pond by using a heat pipe heat exchanger made from 60 copper tubes with 21 mm inside diameter and 22 mm outside diameter. The length ofmore » the evaporator and condenser section was 800 mm and 200 mm respectively. R134a was used as the heat transfer fluid in the experiment. The theoretical model was formulated for the solar pond heat extraction on the basis of the energy conservation equations and by using the solar radiation data for the above location. Numerical methods were used to solve the modeling equations. In the analysis, the performance of heat exchanger is investigated by varying the velocity of inlet air used to extract heat from the condenser end of the heat pipe heat exchanger (HPHE). Air velocity was found to have a significant influence on the effectiveness of heat pipe heat exchanger. In the present investigation, there was an increase in effectiveness by 43% as the air velocity was decreased from 5 m/s to 1 m/s. The results obtained from the theoretical model showed good agreement with the experimental data. (author)« less

  2. In-line inspection of unpiggable buried live gas pipes using circumferential EMAT guided waves

    NASA Astrophysics Data System (ADS)

    Ren, Baiyang; Xin, Junjun

    2018-04-01

    Unpiggable buried gas pipes need to be inspected to ensure their structural integrity and safe operation. The CIRRIS XITM robot, developed and operated by ULC Robotics, conducts in-line nondestructive inspection of live gas pipes. With the no-blow launching system, the inspection operation has reduced disruption to the public and by eliminating the need to dig trenches, has minimized the site footprint. This provides a highly time and cost effective solution for gas pipe maintenance. However, the current sensor on the robot performs a point-by-point measurement of the pipe wall thickness which cannot cover the whole volume of the pipe in a reasonable timeframe. The study of ultrasonic guided wave technique is discussed to improve the volume coverage as well as the scanning speed. Circumferential guided wave is employed to perform axial scanning. Mode selection is discussed in terms of sensitivity to different defects and defect characterization capability. To assist with the mode selection, finite element analysis is performed to evaluate the wave-defect interaction and to identify potential defect features. Pulse-echo and through-transmission mode are evaluated and compared for their pros and cons in axial scanning. Experiments are also conducted to verify the mode selection and detect and characterize artificial defects introduced into pipe samples.

  3. Study of the structure and properties of metal of the major steam lines of a CCGT-420 unit made from high-chromium X10CrMoVNb9-1 (P91) steel

    NASA Astrophysics Data System (ADS)

    Grin', E. A.; Anokhov, A. E.; Pchelintsev, A. V.; Krüger, E.-T.

    2016-07-01

    The technology of manufacture of live steam lines and hot reheat lines at FINOW Rohrsysteme GmbH are discussed. These pipelines are designed for high-performance CCGT units and are made from high-chromium martensitic steel X10CrMoVNb9-1 (P91). The principles of certification and evaluation of conformance of thermal and mechanical equipment made from new construction materials with the TRCU 032-2013 technical regulation of the Customs Union are detailed. The requirements outlined in Russian and international regulatory documents regarding the manufacture of pipes and semifinished products for pipeline systems are compared. The characteristic features of high-chromium martensitic steel, which define the requirements for its heat treatment and welding, are outlined. The methodology and the results of a comprehensive analysis of metal of pipes, fittings, and weld joints of steam lines are presented. It is demonstrated that the short-term mechanical properties of metal (P91 steel) of pipes, bends, and weld joints meet the requirements of European standards and Russian technical specifications. The experimental data on long-term strength of metal of pipes from a live steam line virtually match the corresponding reference curve from the European standard, while certain experimental points for metal of bends of this steam line and metal of pipes and bends from a hot reheat line lie below the reference curve, but they definitely stay within the qualifying (20%) interval of the scatter band. The presence of a weakened layer in the heat-affected zone of weld joints of steel P91 is established. It is shown that the properties of this zone govern the short-term and long-term strength of weld joints in general. The results of synthesis and analysis of research data support the notion that the certification testing of steam lines and other equipment made from chromium steels should necessarily involve the determination of long-term strength parameters.

  4. Investigation of a Modified 9Cr-1Mo (P91) Pipe Failure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klueh, Ronald L; Shingledecker, John P

    2006-04-01

    A modified 9Cr-1Mo feedwater (condensate) line at an Eastman Chemical Company plant failed in January 2005. The line was in continuous service since start-up December 2001 until failure. The Plant Superintendent estimated there were three thermal cycles since start-up, although there may have been as many as 25 thermal cycles during commissioning. Normal operating temperature was 325 F (163 C) and pressure was 1762 psig. The line was steam traced with the tracing activated only when ambient outdoor temperature dropped to 40 F (5 C). A modified 9Cr-1Mo steel (P91) pipe failure in a feedwater line in a chemical plantmore » was investigated. The failure occurred in the vicinity of an elbow produced with socket welds of the pipe to the elbow. Based on metallography and hardness measurements, it was concluded that failure occurred because of an improper post-weld heat treatment of the socket weldment.« less

  5. 76 FR 67413 - Antidumping or Countervailing Duty Order, Finding, or Suspended Investigation; Opportunity To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... Carbon And Alloy Steel A-570-956 11/10/10-10/31/11 Standard, Line, And Pressure Pipe Seamless Refined......... Lightweight Thermal Paper C-570-921 1/1/10-12/31/10 Seamless Carbon and Alloy Steel Standard, Line, 11/10/10.../31/11 Circular Welded Non-Alloy Steel Pipe A-351-809... 11/1/10-10/31/11 Germany: Lightweight Thermal...

  6. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  7. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  8. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  9. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  10. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  11. Noncontact measurement of high temperature using optical fiber sensors

    NASA Technical Reports Server (NTRS)

    Claus, R. O.

    1990-01-01

    The primary goal of this research program was the investigation and application of noncontact temperature measurement techniques using optical techniques and optical fiber methods. In particular, a pyrometer utilizing an infrared optical light pipe and a multiwavelength filtering approach was designed, revised, and tested. This work was motivated by the need to measure the temperatures of small metallic pellets (approximately 3 mm diameter) in free fall at the Microgravity Materials Processing Drop Tube at NASA Marshall Space Flight Center. In addition, research under this program investigated the adaptation of holography technology to optical fiber sensors, and also examined the use of rare-earth dopants in optical fibers for use in measuring temperature. The pyrometer development effort involved both theoretical analysis and experimental tests. For the analysis, a mathematical model based on radiative transfer principles was derived. Key parameter values representative of the drop tube system, such as particle size, tube diameter and length, and particle temperature, were used to determine an estimate of the radiant flux that will be incident on the face of an optical fiber or light pipe used to collect radiation from the incandescent falling particle. An extension of this work examined the advantage of inclining or tilting the collecting fiber to increase the time that the falling particle remains in the fiber field-of-view. Those results indicate that increases in total power collected of about 15 percent may be realized by tilting the fiber. In order to determine the suitability of alternative light pipes and optical fibers, and experimental set-up for measuring the transmittance and insertion loss of infrared fibers considered for use in the pyrometer was assembled. A zirconium fluoride optical fiber and several bundles of hollow core fiber of varying diameters were tested. A prototype two-color pyrometer was assembled and tested at Virginia Tech, and then tested on the Drop Tube at Marshall Space Flight Center. Radiation from 5 mm diameter niobium drops falling in the Drop Tube was successfully detected, and recorded for later analysis. Subsequent analysis indicated that the imaging of light output from the light pipe onto the detector active areas was not identical for both detectors.

  12. Preston Probe Calibrations at High Reynolds Number

    NASA Technical Reports Server (NTRS)

    Smits, Alexander J.

    1998-01-01

    The overall goal of the research effort is to study the performance of two Preston probes designed by NASA Langley Research Center across an unprecedented range of Reynolds number (based on friction velocity and probe diameter), and perform an accurate calibration over the same Reynolds number range. Using the Superpipe facility in Princeton, two rounds of experiments were performed. In each round of experiments for each Reynolds number, the pressure gradient, static pressure from the Preston probes and the total pressure from the Preston probes were measured. In the first round, 3 Preston probes having outer diameters of 0.058 inches, 0.083 inches and 0.203 inches were tested over a large range of pipe Reynolds numbers. Two data reduction methods were employed: first, the static pressure measured on the Preston probe was used to calculate P (modified Preston probe configuration), and secondly, the static pressure measured at the reference pressure tap was used to calculate P (un-modified Preston probe configuration). For both methods, the static pressure was adjusted to correspond with the static pressure at the Preston probe tip using the pressure gradient. The measurements for Preston probes with diameters of 0.058 inches, and 0.083 inches respectively were performed in the test pipe before it was polished a second time. Therefore, the measurements at high pipe Reynolds numbers may have been affected by roughness. In the second round of experiments the 0.058 inches and 0.083 inches diameter, un-modified probes were tested after the pipe was polished and prepared to ensure that the surface was smooth. The average velocity was estimated by assuming that the connection between the centerline velocity and the average velocity was known, and by using a Pitot tube to measure the centerline velocity. A preliminary error estimate suggests that it is possible to introduce a 1% to 2% error in estimating the average velocity using this approach. The evidence on the errors attending the second data set is somewhat circumstantial, and the measurements have not been repeated using a better approach, it seems probable that the correlation given applies to un-modified Preston probes over the range 6.4 less than x* less than 11.3.

  13. Pipe crawler with extendable legs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zollinger, W.T.

    1991-04-02

    This invention is comprised of a pipe crawler for moving through a pipe in inchworm fashion having front and rear leg assemblies separated by air cylinders to increase and decrease the spacing. between assemblies. Each leg of the four legs of an assembly is moved between a wall-engaging, extended position and a retracted position by a separate air cylinder. The air cylinders of the leg assemblies are preferably arranged in pairs of oppositely directed cylinders with no pair laying in the same axial plane as another pair. Therefore, the cylinders can be as long as a leg assembly is widemore » and the crawler can crawl through sections of pipes where the diameter is twice that of other sections. The crawler carries a valving system, a manifold to distribute air supplied by a single umbilical air hose to the various air cylinders in a sequence controlled electrically by a controller. The crawler also utilizes a rolling mechanism, casters in this case, to reduce friction between the crawler and pipe wall thereby further extending the range of the pipe crawler.« less

  14. Pipe crawler with extendable legs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zollinger, W.T.

    1992-06-16

    A pipe crawler for moving through a pipe in inchworm fashion having front and rear leg assemblies separated by air cylinders to increase and decrease the spacing between assemblies. Each leg of the four legs of an assembly is moved between a wall-engaging, extended position and a retracted position by a separate air cylinder. The air cylinders of the leg assemblies are preferably arranged in pairs of oppositely directed cylinders with no pair lying in the same axial plane as another pair. Therefore, the cylinders can be as long as a leg assembly is wide and the crawler can crawlmore » through sections of pipes where the diameter is twice that of other sections. The crawler carries a valving system, a manifold to distribute air supplied by a single umbilical air hose to the various air cylinders in a sequence controlled electrically by a controller. The crawler also utilizes a rolling mechanism, casters in this case, to reduce friction between the crawler and pipe wall thereby further extending the range of the pipe crawler. 8 figs.« less

  15. The effect of trench width on the behavior of buried rigid pipes

    NASA Astrophysics Data System (ADS)

    Balkaya, Müge; Saǧlamer, Ahmet

    2014-12-01

    In this study, in order to determine the effect of trench width (Bd) on the behavior of buried rigid pipes, a concrete pipe having an outside diameter of 150 cm and wall thickness (t) of 15 cm was analyzed using 2D PLAXIS finite element program. In the analyses, three different trench widths (Bd = 2.20 m, 3.40 m, and 4.40 m) were modeled. The results of the analyses indicated that, as the width of the trench increases, the axial force, shear force, bending moment, effective normal stress, and the earth load acting on the pipe increased. The variations of the loads acting on the pipe due to the increasing trench widths were also evaluated using the Marston load theory. When the loads calculated by the Marston Load Theory and the finite element analysis were compared with each other, it was seen that the Marston Load Theory resulted in slightly higher load values than the finite element analysis. On the other hand, for the two methods, the loads acting on the pipe increased with increasing trench width.

  16. Cleaning residual NaK in the fast flux test facility fuel storage cooling system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burke, T.M.; Church, W.R.; Hodgson, K.M.

    2008-01-15

    The Fast Flux Test Facility (FFTF), located on the U.S. Department of Energy's Hanford Reservation, is a liquid metal-cooled test reactor. The FFTF was constructed to support the U.S. Liquid Metal Fast Breeder Reactor Program. The bulk of the alkali metal (sodium and NaK) has been drained and will be stored onsite prior to final disposition. Residual NaK needed to be removed from the pipes, pumps, heat exchangers, tanks, and vessels in the Fuel Storage Facility (FSF) cooling system. The cooling system was drained in 2004 leaving residual NaK in the pipes and equipment. The estimated residual NaK volume wasmore » 76 liters in the storage tank, 1.9 liters in the expansion tank, and 19-39 liters in the heat transfer loop. The residual NaK volume in the remainder of the system was expected to be very small, consisting of films, droplets, and very small pools. The NaK in the FSF Cooling System was not radiologically contaminated. The portions of the cooling system to be cleaned were divided into four groups: 1. The storage tank, filter, pump, and associated piping; 2. The heat exchanger, expansion tank, and associated piping; 3. Argon supply piping; 4. In-vessel heat transfer loop. The cleaning was contracted to Creative Engineers, Inc. (CEI) and they used their superheated steam process to clean the cooling system. It has been concluded that during the modification activities (prior to CEI coming onsite) to prepare the NaK Cooling System for cleaning, tank T-914 was pressurized relative to the In-Vessel NaK Cooler and NaK was pushed from the tank back into the Cooler and that on November 6, 2005, when the gas purge through the In-Vessel NaK Cooler was increased from 141.6 slm to 283.2 slm, NaK was forced from the In-Vessel NaK Cooler and it contacted water in the vent line and/or scrubber. The gases from the reaction then traveled back through the vent line coating the internal surface of the vent line with NaK and NaK reaction products. The hot gases also exited the scrubber through the stack and due to the temperature of the gas, the hydrogen auto ignited when it mixed with the oxygen in the air. There was no damage to equipment, no injuries, and no significant release of hazardous material. Even though the FSF Cooling System is the only system at FFTF that contains residual NaK, there are lessons to be learned from this event that can be applied to future residual sodium removal activities. The lessons learned are: - Before cleaning equipment containing residual alkali metal the volume of alkali metal in the equipment should be minimized to the extent practical. As much as possible, reconfirm the amount and location of the alkali metal immediately prior to cleaning, especially if additional evolutions have been performed or significant time has passed. This is especially true for small diameter pipe (<20.3 centimeters diameter) that is being cleaned in place since gas flow is more likely to move the alkali metal. Potential confirmation methods could include visual inspection (difficult in all-metal systems), nondestructive examination (e.g., ultrasonic measurements) and repeating previous evolutions used to drain the system. Also, expect to find alkali metal in places it would not reasonably be expected to be. - Staff with an intimate knowledge of the plant equipment and the bulk alkali metal draining activities is critical to being able to confirm the amount and locations of the alkali metal residuals and to safely clean the residuals. - Minimize the potential for movement of alkali metal during cleaning or limit the distance and locations into which alkali metal can move. - Recognize that when working with alkali metal reactions, occasional pops and bangs are to be anticipated. - Pre-plan emergency responses to unplanned events to assure responses planned for an operating reactor are appropriate for the deactivation phase.« less

  17. Modeling of surface roughness effects on Stokes flow in circular pipes

    NASA Astrophysics Data System (ADS)

    Song, Siyuan; Yang, Xiaohu; Xin, Fengxian; Lu, Tian Jian

    2018-02-01

    Fluid flow and pressure drop across a channel are significantly influenced by surface roughness on a channel wall. The present study investigates the effects of periodically structured surface roughness upon flow field and pressure drop in a circular pipe at low Reynolds numbers. The periodic roughness considered exhibits sinusoidal, triangular, and rectangular morphologies, with the relative roughness (i.e., ratio of the amplitude of surface roughness to hydraulic diameter of the pipe) no more than 0.2. Based upon a revised perturbation theory, a theoretical model is developed to quantify the effect of roughness on fully developed Stokes flow in the pipe. The ratio of static flow resistivity and the ratio of the Darcy friction factor between rough and smooth pipes are expressed in four-order approximate formulations, which are validated against numerical simulation results. The relative roughness and the wave number are identified as the two key parameters affecting the static flow resistivity and the Darcy friction factor.

  18. Turbulent flow in a partially filled pipe

    NASA Astrophysics Data System (ADS)

    Ng, Henry; Cregan, Hope; Dodds, Jonathan; Poole, Robert; Dennis, David

    2017-11-01

    Turbulent flow in a pressure driven pipe running partially full has been investigated using high-speed 2D-3C Stereoscopic Particle Imaging Velocimetry. With the field-of-view spanning the entire pipe cross section we are able to reconstruct the full three dimensional quasi-instantaneous flow field by invoking Taylor's hypothesis. The measurements were carried out over a range of flow depths at a constant Reynolds number based on hydraulic diameter and bulk velocity of Re = 32 , 000 . In agreement with previous studies, the ``velocity dip'' phenomenon, whereby the location of the maximum streamwise velocity occurs below the free surface was observed. A mean flow secondary current is observed near the free surface with each of the counter-rotating rollers filling the half-width of the pipe. Unlike fully turbulent flow in a rectangular open channel or pressurized square duct flow where the secondary flow cells appear in pairs about a corner bisector, the mean secondary motion observed here manifests only as a single pair of vortices mirrored about the pipe vertical centreline.

  19. INTERNAL REPAIR OF PIPELINES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Bruce; Nancy Porter; George Ritter

    2005-07-20

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, undermore » congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.« less

  20. INTERNAL REPAIR OF PIPELINES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robin Gordon; Bill Bruce; Ian Harris

    2004-12-31

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, undermore » congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.« less

  1. INTERNAL REPAIR OF PIPELINES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robin Gordon; Bill Bruce; Ian Harris

    2004-08-17

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, undermore » congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.« less

  2. 27. EXTENSION OF SURGE CHAMBER AND AIR PIPES TO PRESSURE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. EXTENSION OF SURGE CHAMBER AND AIR PIPES TO PRESSURE LINE, HIGHLINE PUMPING PLANT. December 11, 1920 - Highline Canal & Pumping Station, South side of Salt River between Tempe, Phoenix & Mesa, Tempe, Maricopa County, AZ

  3. Drag reducing properties of microalgal exopolymers.

    PubMed

    Ramus, J; Kenney, B E; Shaughnessy, E J

    1989-01-25

    Dilute aqueous solutions of polymers released by marine phytoplankton (microalgae) were shown to effectively reduce drag in capillary pipe flow. Tests were performed in a capillary turbulent flow viscometer which extruded small samples under high pressures. In all, 22 species were screened, and the products of one chlorophyte and four rhodophyte species proved especially effective. The viscoelastic polymers produced by these species delayed the transition from laminar to turbulent flow to significantly higher Re. In general, polymeric regime segments come off the maximum drag reduction asymptote at characteristic retro-onset points, and come to lie approximately parallel to, but displaced upwards from the Prandtl-von Karman line. The delay to transition was shown to be dependent on additive polymer concentration, capillary diameter, and temperature. Ionic concentration, ionic composition, or pH had little effect on drag reducing properties.

  4. Analysis of spatial and temporal spectra of liquid film surface in annular gas-liquid flow

    NASA Astrophysics Data System (ADS)

    Alekseenko, Sergey; Cherdantsev, Andrey; Heinz, Oksana; Kharlamov, Sergey; Markovich, Dmitriy

    2013-09-01

    Wavy structure of liquid film in annular gas-liquid flow without liquid entrainment consists of fast long-living primary waves and slow short-living secondary waves. In present paper, results of spectral analysis of this wavy structure are presented. Application of high-speed LIF technique allowed us to perform such analysis in both spatial and temporal domains. Power spectra in both domains are characterized by one-humped shape with long exponential tail. Influence of gas velocity, liquid Reynolds number, liquid viscosity and pipe diameter on frequency of the waves is investigated. When gravity effect is much lesser than the shear stress, similarity of power spectra at different gas velocities is observed. Using combination of spectral analysis and identification of characteristic lines of primary waves, frequency of generation of secondary waves by primary waves is measured.

  5. 46 CFR 56.20-9 - Valve construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... closed. (b) Valves of Class I piping systems (for restrictions in other classes refer to sections on low temperature service), having diameters exceeding 2 inches must have bolted, pressure seal, or breech lock...

  6. The Droplets Condensate Centering in the Vapour Channel of Short Low Temperature Heat Pipes at High Heat Loads

    NASA Astrophysics Data System (ADS)

    Seryakov, A. V.; Shakshin, S. L.; Alekseev, A. P.

    2017-11-01

    The results of experimental studies of the process of condensate microdroplets centering contained in the moving moist vapour in the vapour channel of short heat pipes (HPs) for large thermal loads are presented. A vapour channel formed by capillary-porous insert in the form of the inner Laval-liked nozzle along the entire length of the HP. In the upper cover forming a condensation surface in the HP, on the diametrical line are installed capacitive sensors, forming three capacitors located at different distances from the longitudinal axis of the vapour channel. With increasing heat load and the boil beginning in the evaporator a large amount of moist vapour in the vapour channel of HP occur the pressure pulsation with frequency of 400-500 Hz and amplitude up to 1·104Pa. These pulsations affect the moving of the inertial droplets subsystem of the vapour and due to the heterogeneity of the velocity profile around the particle flow in the vapour channel at the diameter of microdroplets occurs transverse force, called the Saffman force and shear microdroplets to the center of vapour channel. Using installed in the top cover capacitors we can record the radial displacement of the condensable microdroplets.

  7. An approach to derive some simple empirical equations to calibrate nuclear and acoustic well logging tools.

    PubMed

    Mohammad Al Alfy, Ibrahim

    2018-01-01

    A set of three pads was constructed from primary materials (sand, gravel and cement) to calibrate the gamma-gamma density tool. A simple equation was devised to convert the qualitative cps values to quantitative g/cc values. The neutron-neutron porosity tool measures the qualitative cps porosity values. A direct equation was derived to calculate the porosity percentage from the cps porosity values. Cement-bond log illustrates the cement quantities, which surround well pipes. This log needs a difficult process due to the existence of various parameters, such as: drilling well diameter as well as internal diameter, thickness and type of well pipes. An equation was invented to calculate the cement percentage at standard conditions. This equation can be modified according to varying conditions. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Mechanical performance and parameter sensitivity analysis of 3D braided composites joints.

    PubMed

    Wu, Yue; Nan, Bo; Chen, Liang

    2014-01-01

    3D braided composite joints are the important components in CFRP truss, which have significant influence on the reliability and lightweight of structures. To investigate the mechanical performance of 3D braided composite joints, a numerical method based on the microscopic mechanics is put forward, the modeling technologies, including the material constants selection, element type, grid size, and the boundary conditions, are discussed in detail. Secondly, a method for determination of ultimate bearing capacity is established, which can consider the strength failure. Finally, the effect of load parameters, geometric parameters, and process parameters on the ultimate bearing capacity of joints is analyzed by the global sensitivity analysis method. The results show that the main pipe diameter thickness ratio γ, the main pipe diameter D, and the braided angle α are sensitive to the ultimate bearing capacity N.

  9. Composite drill pipe and method for forming same

    DOEpatents

    Leslie, James C; Leslie, II, James C; Heard, James; Truong, Liem; Josephson, Marvin

    2014-04-15

    Metal inner and outer fittings configured, the inner fitting configured proximally with an external flange and projecting distally to form a cylindrical barrel and stepped down-in-diameter to form an abutment shoulder and then projecting further distally to form a radially inwardly angled and distally extending tapered inner sleeve. An outer sleeve defining a torque tube is configured with a cylindrical collar to fit over the barrel and is formed to be stepped up in diameter in alignment with the first abutment shoulder to then project distally forming a radially outwardly tapered and distally extending bonding surface to cooperate with the inner sleeve to cooperate with the inner sleeve in forming a annular diverging bonding cavity to receive the extremity of a composite pipe to abut against the abutment shoulders and to be bonded to the respective bonding surfaces by a bond.

  10. Effect of Dynamic Pressure on the Performance of Thermoacoustic Refrigerator with Aluminium (Al) Resonator

    NASA Astrophysics Data System (ADS)

    Arya, Bheemsha; Nayak, B. Ramesh; Shivakumara, N. V.

    2018-04-01

    In practice the refrigerants are being used in the conventional refrigeration system to get the required cooling effect. These refrigerants produce Chlorofluorocarbons (CFCs) and Hydro chlorofluorocarbons (HCFCs) which are highly harmful to the environment, particularly depleting of ozone layers resulting in green house emissions. In order to overcome these effects, the research needs to be focused on the development of an ecofriendly refrigeration system. The thermoacoustic refrigeration system is one among such system where the sound waves are used to compress and expand the gas particles. This study focuses on the effect of dynamic pressure on the thermoacoustic refrigerator made of aluminium with overall length of 748.82 mm, and the entire inner surface of the resonator tube was coated with 2mm thickness of polyurethane to minimize the heat losses to the atmosphere. Experiments were conducted with different stack geometries i.e. parallel plates having 0.119 mm thick with spacing between the plates maintained at 0.358 mm, 1mm diameter pipes, 2mm diameter pipes and 4 mm diameter pipes. Experiments were also conducted with different drive ratios of 0.6%, 1% and 1.6% for a constant dynamic pressure of 2 bar and 10 bar for helium and air as working medium. The results were plotted with the help of graphs, the variation of coefficient of performance (COP) and the relative coefficient of performance (COPR) for the above said conditions were calculated.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kozluk, M.J.; Vijay, D.K.

    Postulated catastrophic rupture of high-energy piping systems is the fundamental criterion used for the safety design basis of both light and heavy water nuclear generating stations. Historically, the criterion has been applied by assuming a nonmechanistic instantaneous double-ended guillotine rupture of the largest diameter pipes inside of containment. Nonmechanistic, meaning that the assumption of an instantaneous guillotine rupture has not been based on stresses in the pipe, failure mechanisms, toughness of the piping material, nor the dynamics of the ruptured pipe ends as they separate. This postulated instantaneous double-ended guillotine rupture of a pipe was a convenient simplifying assumption thatmore » resulted in a conservative accident scenario. This conservative accident scenario has now become entrenched as the design basis accident for: containment design, shutdown system design, emergency fuel cooling systems design, and to establish environmental qualification temperature and pressure conditions. The requirement to address dynamic effects associated with the postulated pipe rupture subsequently evolved. The dynamic effects include: potential missiles, pipe whipping, blowdown jets, and thermal-hydraulic transients. Recent advances in fracture mechanics research have demonstrated that certain pipes under specific conditions cannot crack in ways that result in an instantaneous guillotine rupture. Canadian utilities are now using mechanistic fracture mechanics and leak-before-break assessments on a case-by-case basis, in limited applications, to support licensing cases which seek exemption from the need to consider the various dynamic effects associated with postulated instantaneous catastrophic rupture of high-energy piping systems inside and outside of containment.« less

  12. Study and Control of Scour below Pipelines under unidirectional flow

    NASA Astrophysics Data System (ADS)

    Kabiri, Shima; Hoseinzadeh Dalir, Ali

    2016-04-01

    Water and other fluids pipelines laid on sandy rivers and sea bed change flow pattern around pipelines. These changes increase the bed shear stress and the degree of confusion around the pipes and cause to create scour hole below the pipes. In this situation, the occurrence of scour below the pipelines may lead to instability, fracture and bending and even breakage where cause very severe economic and environmental harms eventually. In this research as well as studying of scour under the pipelines, the bed sill had been used as a new mechanism in order to reduce and control of scour. For this purpose, 3 pipes (smooth) with different diameters (D) were modelled in flow condition of PIC U/Uc=0.8-0.9 in the channel with 11m length, 25cm width and depth of 50 cm. Experiment has been performed in below 2 modes: 1) Scour below a smooth pipe without bed sill 2) Scour below a smooth pipe with bed sill. In the 2nd modes bed sill was located at 4 different distances (L=0,D/4,D/2,D) of downstream Of the pipe central axis. In the experiments bed sill was a barrier for spreading wake vortices and it controlled erosions of downstream. Results of this research indicated that whatever the distance of bed sill from central axis of pipe is less, there is the most influence in reducing the scour depth below pipe. In the case that bed sill had been located exactly under central axis of pipe, scour depth under pipe decreased about 100% Also in this situation with passing a long time from the beginning of examination, the pipe self-burial process occurred due to vortex creation in pipe downstream and relocation of particles toward pipe.

  13. Massachusetts Institute of Technology Lincoln Laboratory Facilities Replacement on Hanscom Air Force Base Phase 1 Final Environmental Assessment

    DTIC Science & Technology

    2014-07-24

    Service UST Underground Storage Tank VC Vitrified Clay VOCs Volatile Organic Compounds W Watts 1 1.0 PURPOSE AND NEED FOR ACTION 1.1 INTRODUCTION The...discharged to sanitary drain and the solids slurry is hauled off site for disposal Fluoride drain: welded stainless steel drain piping from wet...diameter vitrified clay (VC) gravity sewer collection pipe, flowing north/northeast to the upper pumping station at Building 1306, is located within the

  14. Multifunctional Carbon Nanotube Fiber Composites

    DTIC Science & Technology

    2004-12-26

    Opt. Eng. 4234 (Smart Materials), 223-23 1, (2001). 9. " Microfabricated Electroactive Carbon Nanotube Actuators", A. Ahluwalia, R.H. Baughman, D. De...peristaltic pumped circulating flow of PVA operating in an open loop consisting of a 1.5 m long, 0.40 cm diameter glass pipe , flex-tubing, and a polymer reserve...forming a gel-like ribbon that flows down the length of the pipe before being released into a rotating water bath where it is collected on a mandrel. Our

  15. Control of Microstructures and the Practical Properties of API X80 Grade Heavy-Wall High-Frequency Electric Resistance-Welded Pipe with Excellent Low-Temperature Toughness

    NASA Astrophysics Data System (ADS)

    Goto, Sota; Nakata, Hiroshi; Toyoda, Shunsuke; Okabe, Takatoshi; Inoue, Tomohiro

    2017-10-01

    This paper describes development of heavy-walled API X80 grade high-frequency electric resistance-welded (HFW) line pipes and conductor-casing pipes with wall thicknesses up to 20.6 mm. A fine bainitic-ferrite microstructure, which is preferable for low-temperature toughness, was obtained by optimizing the carbon content and applying the thermomechanical controlled hot-rolling process. As a result, the Charpy ductile-brittle transition temperature (DBTT) was well below 227 K (-46 °C) in the base metal of the HFW line pipe. When the controlled hot-rolling ratio (CR) was increased from 23 to 48 pct, the area average grain size decreased from 15 to 8 μm. The dependence of CTOD properties on CR was caused by the largest grain which is represented by the area average grain size. No texture development due to the increase of CR from 23 to 48 pct was observed. In addition, because controlled in-line heat treatment of the longitudinal weld seam also produced the fine bainitic-ferrite microstructure at the weld seam, DBTT was lower than 227 K (-46 °C) at the weld portion. The developed pipes showed good girth weldability without preheat treatment, and fracture in the tensile test initiated from the base metal in all cases.

  16. 46 CFR 76.13-90 - Installations contracted for prior to January 1, 1962.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the cargo compartments and similar spaces shall be not less than 11/2-inch pipe size and shall emanate... small spaces may be taken from the nearest stream supply line and shall be not less than 3/4-inch pipe... distribution piping and the number of branches to the various spaces shall be as given in table 76.13-90(b)(4...

  17. 46 CFR 76.13-90 - Installations contracted for prior to January 1, 1962.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the cargo compartments and similar spaces shall be not less than 11/2-inch pipe size and shall emanate... small spaces may be taken from the nearest stream supply line and shall be not less than 3/4-inch pipe... distribution piping and the number of branches to the various spaces shall be as given in table 76.13-90(b)(4...

  18. 46 CFR 76.13-90 - Installations contracted for prior to January 1, 1962.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the cargo compartments and similar spaces shall be not less than 11/2-inch pipe size and shall emanate... small spaces may be taken from the nearest stream supply line and shall be not less than 3/4-inch pipe... distribution piping and the number of branches to the various spaces shall be as given in table 76.13-90(b)(4...

  19. 46 CFR 76.13-90 - Installations contracted for prior to January 1, 1962.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the cargo compartments and similar spaces shall be not less than 11/2-inch pipe size and shall emanate... small spaces may be taken from the nearest stream supply line and shall be not less than 3/4-inch pipe... distribution piping and the number of branches to the various spaces shall be as given in table 76.13-90(b)(4...

  20. 46 CFR 76.13-90 - Installations contracted for prior to January 1, 1962.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the cargo compartments and similar spaces shall be not less than 11/2-inch pipe size and shall emanate... small spaces may be taken from the nearest stream supply line and shall be not less than 3/4-inch pipe... distribution piping and the number of branches to the various spaces shall be as given in table 76.13-90(b)(4...

  1. Theoretical analysis for scaling law of thermal blooming based on optical phase deference

    NASA Astrophysics Data System (ADS)

    Sun, Yunqiang; Huang, Zhilong; Ren, Zebin; Chen, Zhiqiang; Guo, Longde; Xi, Fengjie

    2016-10-01

    In order to explore the laser propagation influence of thermal blooming effect of pipe flow and to analysis the influencing factors, scaling law theoretical analysis of the thermal blooming effects in pipe flow are carry out in detail based on the optical path difference caused by thermal blooming effects in pipe flow. Firstly, by solving the energy coupling equation of laser beam propagation, the temperature of the flow is obtained, and then the optical path difference caused by the thermal blooming is deduced. Through the analysis of the influence of pipe size, flow field and laser parameters on the optical path difference, energy scaling parameters Ne=nTαLPR2/(ρɛCpπR02) and geometric scaling parameters Nc=νR2/(ɛL) of thermal blooming for the pipe flow are derived. Secondly, for the direct solution method, the energy coupled equations have analytic solutions only for the straight tube with Gauss beam. Considering the limitation of directly solving the coupled equations, the dimensionless analysis method is adopted, the analysis is also based on the change of optical path difference, same scaling parameters for the pipe flow thermal blooming are derived, which makes energy scaling parameters Ne and geometric scaling parameters Nc have good universality. The research results indicate that when the laser power and the laser beam diameter are changed, thermal blooming effects of the pipeline axial flow caused by optical path difference will not change, as long as you keep energy scaling parameters constant. When diameter or length of the pipe changes, just keep the geometric scaling parameters constant, the pipeline axial flow gas thermal blooming effects caused by optical path difference distribution will not change. That is to say, when the pipe size and laser parameters change, if keeping two scaling parameters with constant, the pipeline axial flow thermal blooming effects caused by the optical path difference will not change. Therefore, the energy scaling parameters and the geometric scaling parameters can really describe the gas thermal blooming effect in the axial pipe flow. These conclusions can give a good reference for the construction of the thermal blooming test system of laser system. Contrasted with the thermal blooming scaling parameters of the Bradley-Hermann distortion number ND and Fresnel number NF, which were derived based on the change of far field beam intensity distortion, the scaling parameters of pipe flow thermal blooming deduced from the optical path deference variation are very suitable for the optical system with short laser propagation distance, large Fresnel number and obviously changed optical path deference.

  2. Calculation of critical heat transfer in horizontal evaporator pipes in cooling systems of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Aksenov, Andrey; Malysheva, Anna

    2018-03-01

    An exact calculation of the heat exchange of evaporative surfaces is possible only if the physical processes of hydrodynamics of two-phase flows are considered in detail. Especially this task is relevant for the design of refrigeration supply systems for high-rise buildings, where powerful refrigeration equipment and branched networks of refrigerants are used. On the basis of experimental studies and developed mathematical model of asymmetric dispersed-annular flow of steam-water flow in horizontal steam-generating pipes, a calculation formula has been obtained for determining the boundaries of the zone of improved heat transfer and the critical value of the heat flux density. A new theoretical approach to the solution of the problem of the flow structure of a two-phase flow is proposed. The applied method of dissipative characteristics of a two-phase flow in pipes and the principle of a minimum rate of entropy increase in stabilized flows made it possible to obtain formulas that directly reflect the influence of the viscous characteristics of the gas and liquid media on their distribution in the flow. The study showed a significant effect of gravitational forces on the nature of the phase distribution in the cross section of the evaporative tubes. At a mass velocity of a two-phase flow less than 700 kg / m2s, the volume content of the liquid phase near the upper outer generating lines of the tube is almost an order of magnitude lower than the lower one. The calculation of the heat transfer crisis in horizontal evaporative tubes is obtained. The calculated dependence is in good agreement with the experimental data of the author and a number of foreign researchers. The formula generalizes the experimental data for pipes with the diameter of 6-40 mm in the pressure of 2-7 MPa.

  3. Features of a SINDA/FLUINT model of a liquid oxygen supply line

    NASA Astrophysics Data System (ADS)

    Simmonds, Boris G.

    1993-11-01

    The modeling features used in a steady-state heat transfer problem using SINDA/FLUINT are described. The problem modeled is a 125 feet long, 3 inch diameter pipe, filled with liquid oxygen flow driven by a given pressure gradient. The pipe is fully insulated in five sections. Three sections of 1 inch thick spray-on foam and two sections of vacuum jacket. The model evaluates friction, turns losses and convection heat transfer between the fluid and the pipe wall. There is conduction through the foam insulation with temperature dependent thermal conductivity. The vacuum space is modeled with radiation and gas molecular conduction, if present, in the annular gap. Heat is transferred between the outer surface and surrounding ambient by natural convection and radiation; and, by axial conduction along the pipe and through the vacuum jacket spacers and welded seal flanges. The model makes extensive use of SINDA/FLUINT basic capabilities such as the GEN option for nodes and conductors (to generate groups of nodes or conductors), the SIV option (to generate single, temperature varying conductors), the SIM option (for multiple, temperature varying conductors) and the M HX macros for fluids (to generate strings of lumps, paths, and ties representing a diabatic duct). It calls subroutine CONTRN (returns the relative location in the G-array of a network conductor, given an actual conductor number) enabling an extensive manipulation of conductor (calculates an assignment of their values) with DO loops. Models like this illustrate to the new and even to the old SINDA/FLUINT user, features of the program that are not so obvious or known, and that are extremely handy when trying to take advantage of both, the automation of the DATA headers and make surgical modifications to specific parameters of the thermal or fluid elements in the OPERATIONS portion of the model.

  4. Features of a SINDA/FLUINT model of a liquid oxygen supply line

    NASA Technical Reports Server (NTRS)

    Simmonds, Boris G.

    1993-01-01

    The modeling features used in a steady-state heat transfer problem using SINDA/FLUINT are described. The problem modeled is a 125 feet long, 3 inch diameter pipe, filled with liquid oxygen flow driven by a given pressure gradient. The pipe is fully insulated in five sections. Three sections of 1 inch thick spray-on foam and two sections of vacuum jacket. The model evaluates friction, turns losses and convection heat transfer between the fluid and the pipe wall. There is conduction through the foam insulation with temperature dependent thermal conductivity. The vacuum space is modeled with radiation and gas molecular conduction, if present, in the annular gap. Heat is transferred between the outer surface and surrounding ambient by natural convection and radiation; and, by axial conduction along the pipe and through the vacuum jacket spacers and welded seal flanges. The model makes extensive use of SINDA/FLUINT basic capabilities such as the GEN option for nodes and conductors (to generate groups of nodes or conductors), the SIV option (to generate single, temperature varying conductors), the SIM option (for multiple, temperature varying conductors) and the M HX macros for fluids (to generate strings of lumps, paths, and ties representing a diabatic duct). It calls subroutine CONTRN (returns the relative location in the G-array of a network conductor, given an actual conductor number) enabling an extensive manipulation of conductor (calculates an assignment of their values) with DO loops. Models like this illustrate to the new and even to the old SINDA/FLUINT user, features of the program that are not so obvious or known, and that are extremely handy when trying to take advantage of both, the automation of the DATA headers and make surgical modifications to specific parameters of the thermal or fluid elements in the OPERATIONS portion of the model.

  5. Users manual for program ADMIT: Admittance and pressure transfer function developed for use on a PC computer

    NASA Technical Reports Server (NTRS)

    Armstrong, Wilbur C.

    1992-01-01

    The piping in a liquid rocket can assume complex configurations due to multiple tanks, multiple engines, and structures that must be piped around. The capability to handle some of these complex configurations have been incorporated into the ADMIT code. The capability to modify the input on line has been implemented. The configurations allowed include multiple tanks, multiple engines, the splitting of a pipe into unequal segments going to different (or the same) engines. This program will handle the following type elements: straight pipes, bends, inline accumulators, tuned stub accumulators, Helmholtz resonators, parallel resonators, pumps, split pipes, multiple tanks, and multiple engines.

  6. Users manual for program SSFREQ intermediate mode stability curves: Developed for use on a PC computer

    NASA Technical Reports Server (NTRS)

    Armstrong, Wilbur C.

    1992-01-01

    The piping in a liquid rocket can assume complex configurations due to multiple tanks, multiple engines, and structures that must be piped around. The capability to handle some of these complex configurations have been incorporated into the SSFREQ code. The capability to modify the input on line has been implemented. The configurations allowed include multiple tanks, multiple engines, the splitting of a pipe into equal segments going to different (or the same) engines. This program will handle the following type elements: straight pipes, bends, inline accumulators, tuned stub accumulators, Helmholtz resonators, parallel resonators, pumps, split pipes, multiple tanks, and multiple engines.

  7. Electrolytic etching of fine stainless-steel pipes patterned by laser-scan lithography

    NASA Astrophysics Data System (ADS)

    Takahashi, Hiroshi; Sagara, Tomoya; Horiuchi, Toshiyuki

    2017-07-01

    Recently, it is required to develop a method for fabricating cylindrical micro-components in the field of measurement and medical engineering. Here, electrolytic etching of fine stainless-steel pipes patterned by laser-scan lithography was researched. The pipe diameter was 100 μm. At first, a pipe coated with 3-7 μm thick positive resist (tok, PMER P LA-900) was exposed to a violet laser beam with a wavelength of 408 nm (Neoark,TC20-4030-45). The laser beam was reshaped in a circle by placing a pinhole, and irradiated on the pipe by reducing the size in 1/20 using a reduction projection optics. Linearly arrayed 22 slit patterns with a width of 25 μm and a length of 175 μm were delineated in every 90-degree circumferential direction. That is, 88 slits in total were delineated at an exposure speed of 110 μm/s. In the axial direction, patterns were delineated at intervals of 90 μm. Following the pattern delineation, the pipe masked by the resist patterns was electrolytically etched. The pipe was used as an anode and an aluminum cylinder was set as a cathode around the pipe. As the electrolyte, aqueous solution of NaCl and NH4Cl was used. After etching the pipe, the resist was removed by ultrasonic cleaning in acetone. Although feasibility for fabricating multi-slit pipes was demonstrated, sizes of the etched slits were enlarged being caused by the undercut, and the shapes were partially deformed, and all the pipes were snapped at the chuck side.

  8. On prediction of crack in different orientations in pipe using frequency based approach

    NASA Astrophysics Data System (ADS)

    Naniwadekar, M. R.; Naik, S. S.; Maiti, S. K.

    2008-04-01

    A technique based on measurement of change in natural frequencies and modeling of crack by rotational spring is employed to detect a crack with straight front in different orientations in a section of straight horizontal steel hollow pipe (outer diameter 0.0378 m and inner diameter 0.0278 m). Crack orientations in the range 0-60° with the vertical have been examined and sizes/depths in the range 1-4 mm through the wall of thickness 5 mm have been studied. Variation of rotational spring stiffness with crack size and orientation has been obtained experimentally by deflection and vibration methods. The spring stiffness reduces as expected, with an increase in crack size; it increases with an increase in the crack orientation angle. The crack location has been predicted with a maximum error of 7.29%. The sensitivity of the method for prediction of crack location on variations in experimental data has been examined by changing the difference between the frequencies of pipes with and without crack by ±10%. The method is found to be very robust; the maximum variation in location is 2.68%, which is much less than the change in frequency difference introduced.

  9. Pipeline welding goes mechanized

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beeson, R.

    1999-11-01

    Spread four has bugs in the cornfield--but not to worry. The bug referred to here is a mechanized welding bug, specifically a single welding head, computer-aided gas metal arc (GMAW) system from CRC-Evans Automatic Welding powered by a Miller Electric XMT{reg{underscore}sign} 304 inverter-based welding machine. The bug operator and owner of 32 inverters is Welded Construction, L.P., of Perrysburgh, Ohio. Spread four is a 147-mile stretch of the Alliance Pipeline system (Alliance) cutting through the cornfields of northeast Iowa. While used successfully in Canada and Europe for onshore and offshore pipeline construction for 30 years, this is the first large-scalemore » use of mechanized welding in the US on a cross-country pipeline. On longer, larger-diameter and thicker-wall pipe projects--the Alliance mainline has 1,844 miles of pipe, most of it 36-in. diameter with a 0.622-in. wall thickness--mechanized GMAW offers better productivity than manual shielded metal arc welding (SMAW). In addition, high-strength steels, such as the API 5L Grade X70 pipe used on the Alliance, benefit from the low-hydrogen content of certain solid and tubular wire electrodes.« less

  10. A combined NLP-differential evolution algorithm approach for the optimization of looped water distribution systems

    NASA Astrophysics Data System (ADS)

    Zheng, Feifei; Simpson, Angus R.; Zecchin, Aaron C.

    2011-08-01

    This paper proposes a novel optimization approach for the least cost design of looped water distribution systems (WDSs). Three distinct steps are involved in the proposed optimization approach. In the first step, the shortest-distance tree within the looped network is identified using the Dijkstra graph theory algorithm, for which an extension is proposed to find the shortest-distance tree for multisource WDSs. In the second step, a nonlinear programming (NLP) solver is employed to optimize the pipe diameters for the shortest-distance tree (chords of the shortest-distance tree are allocated the minimum allowable pipe sizes). Finally, in the third step, the original looped water network is optimized using a differential evolution (DE) algorithm seeded with diameters in the proximity of the continuous pipe sizes obtained in step two. As such, the proposed optimization approach combines the traditional deterministic optimization technique of NLP with the emerging evolutionary algorithm DE via the proposed network decomposition. The proposed methodology has been tested on four looped WDSs with the number of decision variables ranging from 21 to 454. Results obtained show the proposed approach is able to find optimal solutions with significantly less computational effort than other optimization techniques.

  11. Flexible metallic ultrasonic transducers for structural health monitoring of pipes at high temperatures.

    PubMed

    Shih, Jeanne-Louise; Kobayashi, Makiko; Jen, Cheng-Kuei

    2010-09-01

    Piezoelectric films have been deposited by a sol-gel spray technique onto 75-μm-thick titanium and stainless steel (SS) membranes and have been fabricated into flexible ultrasonic transducers (FUTs). FUTs using titanium membranes were glued and those using SS membranes brazed onto steel pipes, procedures that serve as on-site installation techniques for the purpose of offering continuous thickness monitoring capabilities at up to 490 °C. At 150 °C, the thickness measurement accuracy of a pipe with an outer diameter of 26.6 mm and a wall thickness of 2.5 mm was estimated to be 26 μm and the center frequency of the FUT was 10.8 MHz. It is demonstrated that the frequency bandwidth of the FUTs and SNR of signals using glue or brazing materials as high-temperature couplant for FUTs are sufficient to inspect the steel pipes even with a 2.5 mm wall thickness.

  12. Looking north at the threading machine of the no. 1 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking north at the threading machine of the no. 1 seamless line in bay 11 of the main pipe mill building - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  13. Detail exterior view looking north showing piping system adjacent to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail exterior view looking north showing piping system adjacent to engine house. Gas cooling system is on far right. - Burnsville Natural Gas Pumping Station, Saratoga Avenue between Little Kanawha River & C&O Railroad line, Burnsville, Braxton County, WV

  14. Evaluation of ultraliner PVC alloy pipeliner.

    DOT National Transportation Integrated Search

    2013-12-01

    In an effort to evaluate promising pipe lining techniques, the Agency installed two Ultraliner : PVC Alloy Pipeliners in the town of Barton, Vermont in May of 2003; one in an 18 : - : inch (450 : mm nominal) reinforced concrete pipe (RCP) and one in ...

  15. Looking north at uing press of the submerged arc weld ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking north at u-ing press of the submerged arc weld (saw) line of the main pipe mill building, bay 7. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  16. Testing and design life analysis of polyurea liner materials

    NASA Astrophysics Data System (ADS)

    Ghasemi Motlagh, Siavash

    Certainly, water pipes, as part of an underground infrastructure system, play a key role in maintaining quality of life, health, and wellbeing of human kind. As these potable water pipes reach the end of their useful life, they create high maintenance costs, loss of flow capacity, decreased water quality, and increased dissatisfaction. There are several different pipeline renewal techniques available for different applications, among which linings are most commonly used for the renewal of water pipes. Polyurea is a lining material applied to the interior surface of the deteriorated host pipe using spray-on technique. It is applied to structurally enhance the host pipe and provide a barrier coating against further corrosion or deterioration. The purpose of this study was to establish a relationship between stress, strain and time. The results obtained from these tests were used in predicting the strength of the polyurea material during its planned 50-year design life. In addition to this, based on the 10,000 hours experimental data, curve fitting and Findley power law models were employed to predict long-term behavior of the material. Experimental results indicated that the tested polyurea material offers a good balance of strength and stiffness and can be utilized in structural enhancement applications of potable water pipes.

  17. Centrifugal compressor modifications and their effect on high-frequency pipe wall vibration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Motriuk, R.W.; Harvey, D.P.

    1998-08-01

    High-frequency pulsation generated by centrifugal compressors, with pressure wave-lengths much smaller than the attached pipe diameter, can cause fatigue failures of the compressor internals, impair compressor performance, and damage the attached compressor piping. There are numerous sources producing pulsation in centrifugal compressors. Some of them are discussed in literature at large (Japikse, 1995; Niese, 1976). NGTL has experienced extreme high-frequency discharge pulsation and pipe wall vibration on many of its radial inlet high-flow centrifugal gas compressor facilities. These pulsations led to several piping attachment failures and compressor internal component failures while the compressor operated within the design envelope. This papermore » considers several pulsation conditions at an NGTL compression facility which resulted in unacceptable piping vibration. Significant vibration attenuation was achieved by modifying the compressor (pulsation source) through removal of the diffuser vanes and partial removal of the inlet guide vanes (IGV). Direct comparison of the changes in vibration, pulsation, and performance are made for each of the modifications. The vibration problem, probable causes, options available to address the problem, and the results of implementation are reviewed. The effects of diffuser vane removal on discharge pipe wall vibration as well as changes in compressor performance are described.« less

  18. Life Test Approach for Refractory Metal/Sodium Heat Pipes

    NASA Technical Reports Server (NTRS)

    Martin, James J.; Reid, Robert S.

    2006-01-01

    Heat pipe life tests described in the literature have seldom been conducted on a systematic basis. Typically one or more heat pipes are built and tested for an extended period at a single temperature with simple condenser loading. This paper describes an approach to generate carefully controlled data that can conclusively establish heat pipe operating life with material-fluid combinations capable of extended operation. Approximately 10 years of operational life might be compressed into 3 years of laboratory testing through a combination of increased temperature and mass fluence. Two specific test series have been identified and include: investigation of long term corrosion rates based on the guidelines contained in ASTM G-68-80 (using 7 heat pipes); and investigation of corrosion trends in a cross correlation sequence at various temperatures and mass fluences based on a central composite test design (using 9 heat pipes). The heat pipes selected for demonstration purposes are fabricated from a Mo-44.5%Re alloy with a length of 0.3 meters and a diameter of 1.59 cm(to conserve material) with a condenser to evaporator length ratio of approximately 3. The wick is a crescent annular design formed from 400-mesh Mo-Re alloy material hot isostatically pressed to produce a final wick core of 20 microns or less.

  19. Gaskets of teflon-bonded EPDM halt leakage from acid lines - low sealing force design eliminates flange distress

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, I.S.; Gaines, A.

    1987-11-01

    The W.R. Grace Chemical Division plant in Lake Charles, LA had to stop producing catalysts for the oil refining industry whenever a piping system for 98% sulfuric acid developed a leak. Gaskets of a nonasbestos material were being used between the flanges of the steel pipe lined with TFE or polypropylene. The flange bolts were kept tight, but the gaskets usually failed to maintain a leaktight seal with the acid at 60 psi for more than a few weeks or months. The acid lines had to be drained before the faulty gasket could be replaced, and production downtime would rangemore » from one to three hours. In July 1986, the plant decided to try a chemical resistant gasket of Teflon molded and bonded to a core of Shore A 65-66 durometer EPDM rubber in the acid lines. The resilient gasket also has patented double convex rings on both faces for optimum sealing with only one-eighth the bolt tightening torque commonly required with flat-faced gaskets. The low sealing force requirement prolongs the life of the gasket, eliminates plastic cold flow at the flange of lined steel pipe, and avoids stresses that can damage thermoplastic and fiberglass piping systems. The gasket has a temperature range of {minus}4 to 210{degree}F and is available in 1/2 through 12 inch sizes that conform to ANSI B16.1 flange dimensions. Alternative gasket materials are Kynar PVDF-bonded EPDM and EPDM without a fluoropolymer laminate. The Teflon-bonded EPDM gaskets eliminated unscheduled catalyst production downtime due to leakage from the sulfuric acid piping system. The plant maintains an inventory of the low torque gasket, but has never had to replace any that have been in service since July 1986.« less

  20. Water driven turbine/brush pipe cleaner

    NASA Technical Reports Server (NTRS)

    Werlink, Rudy J. (Inventor)

    1995-01-01

    Assemblies are disclosed for cleaning the inside walls of pipes and tubes. A first embodiment includes a small turbine with angled blades axially mounted on one end of a standoff support. An O-ring for stabilizing the assembly within the pipe is mounted in a groove within the outer ring. A replaceable circular brush is fixedly mounted on the opposite end of the standoff support and can be used for cleaning tubes and pipes of various diameters, lengths and configurations. The turbine, standoff support, and brush spin in unison relative to a hub bearing that is fixedly attached to a wire upstream of the assembly. The nonrotating wire is for retaining the assembly in tension and enabling return of the assembly to the pipe entrance. The assembly is initially placed in the pipe or tube to be cleaned. A pressurized water or solution source is provided at a required flow-rate to propel the assembly through the pipe or tube. The upstream water pressure propels and spins the turbine, standoff support and brush. The rotating brush combined with the solution cleans the inside of the pipe. The solution flows out of the other end of the pipe with the brush rotation controlled by the flow-rate. A second embodiment is similar to the first embodiment but instead includes a circular shaped brush with ring backing mounted in the groove of the exterior ring of the turbine, and also reduces the size of the standoff support or eliminates the standoff support.

  1. TSTA Piping and Flame Arrestor Operating Experience Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cadwallader, Lee C.; Willms, R. Scott

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences andmore » the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.« less

  2. Ball feeder for replenishing evaporator feed

    DOEpatents

    Felde, David K.; McKoon, Robert H.

    1993-01-01

    Vapor source material such as uranium, which is to be dropped into a melt in an evaporator, is made into many balls of identical diameters and placed inside a container. An elongated sloping pipe is connected to the container and leads to the evaporator such that these balls can travel sequentially therealong by gravity. A metering valve in this pipe for passing these balls one at a time is opened in response to a signal when it is ascertained by a detector that there is a ball ready to be passed. A gate in the pipe near the evaporator momentarily stops the motion of the traveling ball and is then opened to allow the ball drop into the melt at a reduced speed.

  3. Ball feeder for replenishing evaporator feed

    DOEpatents

    Felde, D.K.; McKoon, R.H.

    1993-03-23

    Vapor source material such as uranium, which is to be dropped into a melt in an evaporator, is made into many balls of identical diameters and placed inside a container. An elongated sloping pipe is connected to the container and leads to the evaporator such that these balls can travel sequentially therealong by gravity. A metering valve in this pipe for passing these balls one at a time is opened in response to a signal when it is ascertained by a detector that there is a ball ready to be passed. A gate in the pipe near the evaporator momentarily stops the motion of the traveling ball and is then opened to allow the ball drop into the melt at a reduced speed.

  4. Heat Rejection Concepts for Brayton Power Conversion Systems

    NASA Technical Reports Server (NTRS)

    Siamidis, John; Mason, Lee; Beach, Duane; Yuko, James

    2005-01-01

    This paper describes potential heat rejection design concepts for closed Brayton cycle (CBC) power conversion systems. Brayton conversion systems are currently under study by NASA for Nuclear Electric Propulsion (NEP) applications. The Heat Rejection Subsystem (HRS) must dissipate waste heat generated by the power conversion system due to inefficiencies in the thermal-to-electric conversion process. Space Brayton conversion system designs tend to optimize at efficiencies of about 20 to 25 percent with radiator temperatures in the 400 to 600 K range. A notional HRS was developed for a 100 kWe-class Brayton power system that uses a pumped sodium-potassium (NaK) heat transport loop coupled to a water heat pipe radiator. The radiator panels employ a sandwich construction consisting of regularly-spaced circular heat pipes contained within two composite facesheets. Heat transfer from the NaK fluid to the heat pipes is accomplished by inserting the evaporator sections into the NaK duct channel. The paper evaluates various design parameters including heat pipe diameter, heat pipe spacing, and facesheet thickness. Parameters were varied to compare design options on the basis of NaK pump pressure rise and required power, heat pipe unit power and radial flux, radiator panel areal mass, and overall HRS mass.

  5. Southwest view of rotary hearth furnace of the no. 2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Southwest view of rotary hearth furnace of the no. 2 seamless line in bays 17 and 18 of the main pipe mill building. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  6. Northwest view of rotary hearth furnace of the no. 2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Northwest view of rotary hearth furnace of the no. 2 seamless line in bays 17 and 18 of the main pipe mill building. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  7. Study of a pipe-scanning robot for use in post-construction evaluation during horizontal directional drilling.

    DOT National Transportation Integrated Search

    2015-06-01

    Trenchless Technology has become an increasingly popular underground utility construction method, beginning in : the early 1900s with pipe jacking beneath railroad lines. One method, horizontal directional drilling (HDD), became : more common in the ...

  8. 78 FR 57455 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... ``. . . system-specific information, including pipe diameter, operating pressure, product transported, and...) must provide contact information and geospatial data on their pipeline system. This information should... Mapping System (NPMS) to support various regulatory programs, pipeline inspections, and authorized...

  9. On the calculation of turbulent heat transport downstream from an abrupt pipe expansion

    NASA Technical Reports Server (NTRS)

    Chieng, C. C.; Launder, B. E.

    1980-01-01

    A numerical study is reported of flow and heat transfer in the separated flow region created by an abrupt pipe expansion. Computations employed an adaptation of the TEACH-2E computer program with the standard model of turbulence. Emphasis is given to the simulation, from both a physical and numerical viewpoint, of the region in the immediate vicinity of the wall where turbulent transport gives way to molecular conduction and diffusion. Wall resistance laws or wall functions used to bridge this near-wall region are based on the idea that, beyond the viscous sublayer, the turbulent length scale is universal, increasing linearly with distance from the wall. Predictions of expermental data for a diameter ratio of 0.54 show generally encouraging agreement with experiment. At a diameter of 0.43 different trends are discernible between measurement and calculation though this appears to be due to effects unconnected with the wall region studied.

  10. CFD Analysis of nanofluid forced convection heat transport in laminar flow through a compact pipe

    NASA Astrophysics Data System (ADS)

    Yu, Kitae; Park, Cheol; Kim, Sedon; Song, Heegun; Jeong, Hyomin

    2017-08-01

    In the present paper, developing laminar forced convection flows were numerically investigated by using water-Al2O3 nano-fluid through a circular compact pipe which has 4.5mm diameter. Each model has a steady state and uniform heat flux (UHF) at the wall. The whole numerical experiments were processed under the Re = 1050 and the nano-fluid models were made by the Alumina volume fraction. A single-phase fluid models were defined through nano-fluid physical and thermal properties calculations, Two-phase model(mixture granular model) were processed in 100nm diameter. The results show that Nusselt number and heat transfer rate are improved as the Al2O3 volume fraction increased. All of the numerical flow simulations are processed by the FLUENT. The results show the increment of thermal transfer from the volume fraction concentration.

  11. Technological study on reducing blast-hole rate during laser cutting oil pipe

    NASA Astrophysics Data System (ADS)

    Deng, Qiansong; Yang, Weihong; Tang, Xiahui; Peng, Hao; Qin, Yingxiong

    2012-03-01

    In this paper, a laser cutting technology for the oil pipes with the thickness of 10mm, the diameter of 142mm and the material of N80 has been developed, in order to reduce the high hole-blast rate in processing. Experiments are taken on the Rofin DC025 slab CO2 laser cutting system and a set of flexible fixtures. The reasons of forming blast-hole have been analyzed, and the influences of technique parameters on blast-hole rate have been studied, such as laser power, pulse frequency, laser delay, focus position and oxygen pressure. The results show that the blast-hole rate can be controlled lower than 5% at the conditions of laser power 1500W, laser delay 5s, pulse frequency 180Hz, the oxygen pressure 0.6 kg/cm2, focus length 190mm, nozzle diameter 1.5mm.

  12. Understanding Bright 13 keV Kr K-shell X-ray Sources at the NIF

    NASA Astrophysics Data System (ADS)

    May, M. J.; Colvin, J. D.; Kemp, G. E.; Fournier, K. B.; Scott, H.; Patel, M.; Barrios, Widmann; Widmann, K.

    2015-11-01

    High x-ray conversion efficiency (CE) K-shell Kr sources are being investigated for High Energy Density experiments. These sources are 4.1 mm in diameter 4.4 mm tall hollow epoxy tubes having a 40 μm thick wall holding either 1.2 or 1.5 atm of Kr gas. The CE of K-shell Kr is dependent upon the peak electron temperature in the radiating plasma. In the NIF experiments, the available energy heats the source to Te = 6-7 keV, well below the temperature of Te ~25 keV needed to optimize the Kr CE. The CE is a steep function of the peak electron temperature. A spatially averaged electron temperature can be estimated from measured He(α) and Ly(α) line ratios. Some disagreement has been observed in the simulated and measured line ratios for some of these K-shell sources. Disagreements have been observed between the simulated and measured line ratios for some of these K-shell sources. To help understand this issue, Kr gas pipes have been shot with 3 ω light at ?750 kJ at ~210, ~140 TW and ~120 TW power levels with 3.7, 5.2 and 6.7 ns pulses, respectively. The power and pulse length scaling of the measured CE and K-shell line ratios and their comparison to simulations will be discussed. This work was performed under the auspic

  13. Liquid metal micro heat pipes for space radiator applications

    NASA Technical Reports Server (NTRS)

    Gerner, F. M.; Henderson, H. T.

    1995-01-01

    Micromachining is a chemical means of etching three-dimensional structures, typically in single-crystalline silicon. These techniques are leading toward what is coming to be referred to as MEMS (micro electro mechanical systems), where in addition to the ordinary two dimensional (planar) microelectronics, it is possible to build three-dimensional micromotors, electrically-actuated microvalves, hydraulic systems, and much more on the same microchip. These techniques become possible because of differential etching rates of various crystallographic planes and materials used for semiconductor microfabrication. The University of Cincinnati group in collaboration with NASA Lewis formed micro heat pipes in silicon by the above techniques. Work is ongoing at a modest level, but several essential bonding and packaging techniques have been recently developed. Currently, we have constructed and filled water/silicon micro heat pipes. Preliminary thermal tests of arrays of 125 micro heat pipes etched in a 1 inch x 1 inch x 250 micron silicon wafer have been completed. These pipes are instrumented with extremely small P-N junctions to measure their effective conductivity and their maximum operating power. A relatively simple one-dimensional model has been developed in order to predict micro heat pipes' operating characteristics. This information can be used to optimize micro heat pipe design with respect to length, hydraulic diameter, and number of pipes. Work is progressing on the fabrication of liquid-metal micro heat pipes. In order to be compatible with liquid metal (sodium or potassium), the inside of the micro heat pipes will be coated with a refractory metal (such as tungsten, molybdenum, or titanium).

  14. METHOD AND APPARATUS FOR THE DETECTION OF LEAKS IN PIPE LINES

    DOEpatents

    Jefferson, S.; Cameron, J.F.

    1961-11-28

    A method is described for detecting leaks in pipe lines carrying fluid. The steps include the following: injecting a radioactive solution into a fluid flowing in the line; flushing the line clear of the radioactive solution; introducing a detector-recorder unit, comprising a radioactivity radiation detector and a recorder which records the detector signal over a time period at a substantially constant speed, into the line in association with a go-devil capable of propelling the detector-recorder unit through the line in the direction of the fluid flow at a substantia1ly constant velocity; placing a series of sources of radioactivity at predetermined distances along the downstream part of the line to make a characteristic signal on the recorder record at intervals corresponding to the location of said sources; recovering the detector-recorder unit at a downstream point along the line; transcribing the recorder record of any radioactivity detected during the travel of the detector- recorder unit in terms of distance along the line. (AEC)

  15. Ultrasonic liquid-in-line detector for tubes

    DOEpatents

    Piper, Thomas C.

    1991-01-01

    An apparatus and method for detecting the presence of liquid in pipes or tubes using ultrasonic techniques A first piezoelectric crystal is coupled to the outside of the pipe or tube at the location where liquid in the tube is to be detected. A second piezoelectric crystal is coupled to the outside of the pipe or tube at the same location along the tube but circumferentially displaced from the first crystal by an angle around the pipe or tube of less than 180.degree.. Liquid in the pipe or tube is detected by measuring the attenuation of an ultrasonic signal sent by the first piezoelectric crystal and received by the second piezoelectric crystal.

  16. Computational fluid dynamics analysis of space shuttle main propulsion feed line 17-inch disconnect valves

    NASA Technical Reports Server (NTRS)

    Kandula, Max; Pearce, Daniel

    1989-01-01

    A steady incompressible three-dimensional (3-D) viscous flow analysis was conducted for the Space Shuttle Main Propulsion External Tank (ET)/Orbiter (ORB) propellant feed line quick separable 17-inch disconnect flapper valves for liquid oxygen (LO2) and liquid hydrogen (LH2). The main objectives of the analysis were to predict and correlate the hydrodynamic stability of the flappers and pressure drop with available water test data. Computational Fluid Dynamics (CFD) computer codes were procured at no cost from the public domain, and were modified and extended to carry out the disconnect flow analysis. The grid generator codes SVTGD3D and INGRID were obtained. NASA Ames Research Center supplied the flow solution code INS3D, and the color graphics code PLOT3D. A driver routine was developed to automate the grid generation process. Components such as pipes, elbows, and flappers can be generated with simple commands, and flapper angles can be varied easily. The flow solver INS3D code was modified to treat interior flappers, and other interfacing routines were developed, which include a turbulence model, a force/moment routine, a time-step routine, and initial and boundary conditions. In particular, an under-relaxation scheme was implemented to enhance the solution stability. Major physical assumptions and simplifications made in the analysis include the neglect of linkages, slightly reduced flapper diameter, and smooth solid surfaces. A grid size of 54 x 21 x 25 was employed for both the LO2 and LH2 units. Mixing length theory applied to turbulent shear flow in pipes formed the basis for the simple turbulence model. Results of the analysis are presented for LO2 and LH2 disconnects.

  17. Rapid precipitation of silica (opal-A) disguises evidence of biogenicity in high-temperature geothermal deposits: Case study from Dagunguo hot spring, China

    NASA Astrophysics Data System (ADS)

    Peng, Xiaotong; Jones, Brian

    2012-06-01

    Dagunguo Spring, located in the Tengchong geothermal area in the western part of Yunnan Province, China, is a very active spring with water temperatures of 78 to 97 °C and pH of 7.7 to 8.8. The vent pool, 5.6 m in diameter and up to 1.5 m deep, is lined with opal-A that was precipitated from the near-boiling spring waters. A glass suspended in the pool was coated with opal-A in two months and two PVC pipes that drained water from the pool in late 2010 became lined with opal-A precipitates in less than three months. The opal-A accumulated at rates of 0.5 to 0.75 mm/month in the spring pool and 2.5 to 3.5 mm/month in the PVC pipes. The opal-A precipitates, irrespective of where they developed, are formed primarily of silicified microbes and opal-A spheres along with minor amounts of native sulfur, detrital quartz, and clay (mainly kaolinite). The fabrics in these opal-A deposits were dictated largely by the growth patterns of the filamentous and rod-shaped microbes that dominate this low-diversity biota and the amount of opal-A that was precipitated around them. Many of the microbes were preserved as rapid opal-A was precipitated on and around them before the cells decayed. With continued precipitation, however, the microbes became quickly engulfed in the opal-A precipitates and morphological evidence of their presence was lost. In essence, the process that controls their preservation ultimately disguised them to the point where cannot be seen. Critically, this loss of morphological identity takes places even before opal-A starts its diagenetic transformation towards quartz.

  18. Characterization of bond line discontinuities in a high-Mn TWIP steel pipe welded by HF-ERW

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Gitae; Kim, Bongyoon; Kang, Yongjoon

    In this work, the microstructure and defects in a high-frequency electrical resistance welded (HF-ERW) pipe of high-Mn twinning-induced plasticity (TWIP) steel were characterized. The microstructure of the base metal and the bond line were examined using both optical microscopy and scanning electron microscopy. The features of the bond line were similar to those of conventional steel. Simultaneously, the circumferential ductility was evaluated via a flaring test. It was concluded that the deterioration of the circumferential ductility in a high-Mn TWIP steel pipe was caused by irregular shaped oxide defects and a penetrator that had been formed during welding. Specifically, themore » penetrator, which is composed of MnO and Mn{sub 2}SiO{sub 4}, was found to be the most influential on the circumferential ductility of the welded pipe. The penetrator was analyzed using both an electron probe micro analyzer and transmission electron microscopy, and the formation sequence of the penetrator was evaluated. - Highlights: •This study focused on applying the HF-ERW process to the seam welding of expandable pipe using TWIP steels. •For improvement of the circumferential ductility, deterioration factors were characterized. •Penetrator which would mainly deteriorate the circumferential ductility consisted of round MnO and Mn{sub 2}SiO{sub 4}. •Metallurgical evidence of existing theory regarding the mechanism of defect formation during the HF-ERW was characterized.« less

  19. Corrosion potential analysis system

    NASA Astrophysics Data System (ADS)

    Kiefer, Karl F.

    1998-03-01

    Many cities in the northeastern U.S. transport electrical power from place to place via underground cables, which utilize voltages from 68 kv to 348 kv. These cables are placed in seamless steel pipe to protect the conductors. These buried pipe-type-cables (PTCs) are carefully designed and constantly pressurized with transformer oil to prevent any possible contamination. A protective coating placed on the outside diameter of the pipe during manufacture protects the steel pipe from the soil environment. Notwithstanding the protection mechanisms available, the pipes remain vulnerable to electrochemical corrosion processes. If undetected, corrosion can cause the pipes to leak transformer oil into the environment. These leaks can assume serious proportions due to the constant pressure on the inside of the pipe. A need exists for a detection system that can dynamically monitor the corrosive potential on the length of the pipe and dynamically adjust cathodic protection to counter local and global changes in the cathodic environment surrounding the pipes. The northeastern United States contains approximately 1000 miles of this pipe. This milage is critical to the transportation and distribution of power. So critical, that each of the pipe runs has a redundant double running parallel to it. Invocon, Inc. proposed and tested a technically unique and cost effective solution to detect critical corrosion potential and to communicate that information to a central data collection and analysis location. Invocon's solution utilizes the steel of the casing pipe as a communication medium. Each data gathering station on the pipe can act as a relay for information gathered elsewhere on the pipe. These stations must have 'smart' network configuration algorithms that constantly test various communication paths and determine the best and most power efficient route through which information should flow. Each network station also performs data acquisition and analysis tasks that ultimately determine the corrosion risk in a local area. The system has virtually no installation costs and can operate on battery power for at least two years.

  20. Looking south at the aetna standard piercer and mannesman rolls ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking south at the aetna standard piercer and mannesman rolls of the no. 2 seamless line in bay 19 of the main pipe mill building. - U.S. Steel National Tube Works, Main Pipe Mill Building, Along Monongahela River, McKeesport, Allegheny County, PA

  1. 76 FR 11237 - Combined Notice of Filings No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 2 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP10-1400-002. Applicants: Chandeleur Pipe Line Company. Description: Chandeleur Pipe...

  2. 77 FR 16430 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... opposite the line replaceable unit racking. This AD requires replacing a certain aluminum high pressure... proposed to require replacing a certain aluminum high pressure pipe with a new corrosion resistant... comply with paragraph (1) of this [EASA] AD, unless, inadvertently, the high pressure pipe P/N...

  3. Performance demonstration of hydrogen advanced loop heat pipe for 20-30K cryocooling of far infrared sensors

    NASA Astrophysics Data System (ADS)

    Hoang, Triem T.; O'Connell, Tamara A.; Ku, Jentung; Butler, C. D.; Swanson, Theodore D.

    2005-08-01

    The James Webb Space Telescope (JWST) program have identified the need for cryogenic cooling transport devices that (i) provide robust/reliable thermal management for Infrared (IR) sensors/detectors in the temperature range of 20-30K, (ii) minimize vibration effects of mechanical cryocoolers on the instruments, (iii) reduce spatial temperature gradients in cryogenic components, and (iv) afford long continuous service life of the telescope. Passive two-phase capillary cooling technologies such as heat pipes, Loop Heat Pipes (LHPs), and Capillary pumped Loops (CPLs) have proven themselves capable of performing necessary thermal control functions for room temperature applications. They have no mechanical moving part to wear out or to introduce unwanted vibration to the instruments and, hence, are reliable and maintenancefree. However, utilizing these capillary devices for cryogenic cooling still remains a challenge because of difficulties involving the system start-up and operation in a warm environment. An advanced concept of LHP using Hydrogen as the working fluid was recently developed to demonstrate the cryocooling transport capabilities in the temperature range of 20-30K. A full-size demonstration test loop - appropriately called H2-ALHP_2 - was constructed and performance tested extensively in a thermal vacuum chamber. It was designed specifically to manage "heat parasitics" from a warm surrounding, enabling it to start up from an initially supercritical state and operate without requiring a rigid heat shield. Like room temperature LHPs, the H2-ALHP transport lines were made of small-diameter stainless steel tubing that are flexible enough to isolate the cryocooler-induced vibration from the IR instruments. In addition, focus of the H2-ALHP research and development effort was also placed on the system weight saving for space-based applications.

  4. Invariant Type-B characteristics of drag-reducing microalgal biopolymer solutions

    NASA Astrophysics Data System (ADS)

    Gasljevic, K.; Hall, K.; Chapman, D.; Matthys, E. F.

    2017-05-01

    The drag-reducing properties of polysaccharides from marine microalgae were investigated. They were compared to two drag-reducing additives studied extensively in the past, synthetic poly(ethylene) oxide, one of the most effective drag-reducing additives; and Xanthan Gum, another biopolymer often considered a model polymer for chemical and rheological research. Compared to Xanthan Gum, the most effective polymers from our microalgae show a higher drag-reducing efficiency in terms of necessary concentration to achieve a given level of drag reduction. In addition, they show a striking Type-B drag reduction behavior, which may be a very useful quality in most drag reduction applications, thanks to the independence of the drag reduction level on flow conditions such as velocity, shear stress, and tube diameter. With these polymers from microalgae we did not see evidence of Type-A behavior over the wide range of conditions studied (including pipe diameters up to 52 mm). Importantly, this suggests that the Drag Reduction coefficient in pipe flow for ideal drag-reducing solutions such as the polysaccharides investigated here is invariant at a given additive concentration of flow or solution parameters like ionic strength and can be used as a solution property to predict its drag reduction effectiveness over a wide range of conditions. On the contrary, Xanthan Gum showed evidence of both Type-A behavior in large diameter pipes and Type-B behavior in smaller ones. The polymers from microalgae also showed high resistance to degradation. Considering that these microalgae are very effective producers of polysaccharides (both extracellular and intracellular), they appear to be very promising additives for drag reduction applications.

  5. Fluid-flow pressure measurements and thermo-fluid characterization of a single loop two-phase passive heat transfer device

    NASA Astrophysics Data System (ADS)

    Ilinca, A.; Mangini, D.; Mameli, M.; Fioriti, D.; Filippeschi, S.; Araneo, L.; Roth, N.; Marengo, M.

    2017-11-01

    A Novel Single Loop Pulsating Heat Pipe (SLPHP), with an inner diameter of 2 mm, filled up with two working fluids (Ethanol and FC-72, Filling Ratio of 60%), is tested in Bottom Heated mode varying the heating power and the orientation. The static confinement diameter for Ethanol and FC-72, respectively 3.4 mm and 1.7mm, is above and slightly under the inner diameter of the tube. This is important for a better understanding of the working principle of the device very close to the limit between the Loop Thermosyphon and Pulsating Heat Pipe working modes. With respect to previous SLPHP experiments found in the literature, such device is designed with two transparent inserts mounted between the evaporator and the condenser allowing direct fluid flow visualization. Two highly accurate pressure transducers permit local pressure measurements just at the edges of one of the transparent inserts. Additionally, three heating elements are controlled independently, so as to vary the heating distribution at the evaporator. It is found that peculiar heating distributions promote the slug/plug flow motion in a preferential direction, increasing the device overall performance. Pressure measurements point out that the pressure drop between the evaporator and the condenser are related to the flow pattern. Furthermore, at high heat inputs, the flow regimes recorded for the two fluids are very similar, stressing that, when the dynamic effects start to play a major role in the system, the device classification between Loop Thermosyphon and Pulsating Heat Pipe is not that sharp anymore.

  6. The effects of welded joint characteristics on its properties in HDPE thermal fusion welding

    NASA Astrophysics Data System (ADS)

    Dai, Hongbin; Peng, Jun

    2017-05-01

    In this paper, PE100 pipes with the diameter of 200 mm and the thickness of 11.9 mm were used as material. The welded joints were obtained in different welding pressures with the optimal welding temperature of 220∘C. Reheating process on the welded joints with the temperature of 130∘C was carried out. The joints exhibited X-type, and the cause of X-type joints was discussed. The temperature field in the forming process of welded joints was measured, and tensile and bending tests on welded joints were carried out. The fracture surface of welded joints was observed by scanning electron microscopy (SEM), and crystallinity calculation was taken by X-ray diffraction (XRD). The mechanism of X-type weld profile effects on welded joints properties was analyzed. It was concluded that the mechanical properties of welded joints decrease with the reduced X distance between lines.

  7. Sound transmission in narrow pipes with superimposed uniform mean flow and acoustic modelling of automobile catalytic converters

    NASA Astrophysics Data System (ADS)

    Dokumaci, E.

    1995-05-01

    The theory of Zwikker and Kosten for axisymmetric wave propagation in circular pipes has been extended to include the effect of uniform mean flow. This formulation can be used in acoustical modelling of both the honeycomb pipes in monolithic catalytic converters and the standard pipes in internal combustion engine exhaust lines. The effects of mean flow on the propagation constants are shown. Two-port elements for acoustic modelling of the honeycomb structure of monolithic catalytic converters are developed and applied to the prediction of the transmission loss characteristics.

  8. Investigation of Expanding Cements. Report 1. Summary of Information Available as of 1 July 1963

    DTIC Science & Technology

    1965-09-01

    12 . Expansive concrete for pressure pipes has been investigated intensively in the U.S.S.R. since 1953.17 The expansive cements used in the U.S.S.R...tests of 2- by 2- by 1-in. concrete prisms and concrete pipes 12 in. long of 12 -in. diameter and 2-in. wall thickness. They were made with expansive...economical procedure; (2) increased expansion of the concrete--in the present instance the least 4, 12 , q! !I econumical; and (3) both decrease in the

  9. Prediction of pile set-up for Ohio soils.

    DOT National Transportation Integrated Search

    2011-02-01

    ODOT typically uses small diameter driven pipe piles for bridge foundations. When a pile is driven into the subsurface, it disturbs and displaces the soil. As the soil surrounding the pile recovers from the installation disturbance, a time dependant ...

  10. Preliminary Results of an Experimental Investigation of the Qu Superconducting Heat Pipe

    NASA Technical Reports Server (NTRS)

    Blackmon, James B.; Entrekin, Sean F.

    2006-01-01

    This note on preliminary results of our evaluation of the so-called Qu Tube is prompted in part by recent concerns expressed to the authors by some researchers regarding the performance characteristics of the superconducting, solid-state heat pipe as described in the patents, or on the company's websites. Briefly, the company's claims include: a new type of heat transfer mechanism that is a form of solid state thermal superconductivity, which results in an effective thermal conductivity of the order of tens of thousands of times that of an equivalent solid silver bar, or, tens to hundreds of times that of liquid - vapor heat pipes. The company's website also refers to tests conducted by Stanford Research Institute that substantiate these claims, but the report is apparently not publicly available. We are conducting an investigation of the Qu Tube under a NASA Grant, and in general find that these claims have merit, but our study is not yet complete. We present some of our preliminary results in part to show that it would not be imprudent to conduct such studies, especially for possible future applications requiring exceptional thermal management performance capabilities. Working with HiTek Services, we originally acquired several Qu Tubes, including 17" long, 5/16" diameter copper tubes, one that is 7 7/8" long, 3/16" diameter, and one that is 4" long, 1" diameter. We subjected the smaller tubes to various exploratory tests, including a transient test with electrical band heaters, boiling water tests, and a series of steady state tests with electrical band heaters heating one end with free convective cooling along the remainder of the length. All results indicate a very high thermal conductivity, but the length of these tubes limited our ability to obtain accurate data on temperature gradients, necessary to determine the effective thermal conductivity. We then acquired nine Qu Tubes that are 10' long, 5/16" diameter, and we have recently conducted initial tests, which further support the claims of exceptional thermal conductivity.

  11. Optical profilometer using laser based conical triangulation for inspection of inner geometry of corroded pipes in cylindrical coordinates

    NASA Astrophysics Data System (ADS)

    Buschinelli, Pedro D. V.; Melo, João. Ricardo C.; Albertazzi, Armando; Santos, João. M. C.; Camerini, Claudio S.

    2013-04-01

    An axis-symmetrical optical laser triangulation system was developed by the authors to measure the inner geometry of long pipes used in the oil industry. It has a special optical configuration able to acquire shape information of the inner geometry of a section of a pipe from a single image frame. A collimated laser beam is pointed to the tip of a 45° conical mirror. The laser light is reflected in such a way that a radial light sheet is formed and intercepts the inner geometry and forms a bright laser line on a section of the inspected pipe. A camera acquires the image of the laser line through a wide angle lens. An odometer-based triggering system is used to shot the camera to acquire a set of equally spaced images at high speed while the device is moved along the pipe's axis. Image processing is done in real-time (between images acquisitions) thanks to the use of parallel computing technology. The measured geometry is analyzed to identify corrosion damages. The measured geometry and results are graphically presented using virtual reality techniques and devices as 3D glasses and head-mounted displays. The paper describes the measurement principles, calibration strategies, laboratory evaluation of the developed device, as well as, a practical example of a corroded pipe used in an industrial gas production plant.

  12. Shielded fluid stream injector for particle bed reactor

    DOEpatents

    Notestein, John E.

    1993-01-01

    A shielded fluid-stream injector assembly is provided for particle bed reactors. The assembly includes a perforated pipe injector disposed across the particle bed region of the reactor and an inverted V-shaped shield placed over the pipe, overlapping it to prevent descending particles from coming into direct contact with the pipe. The pipe and shield are fixedly secured at one end to the reactor wall and slidably secured at the other end to compensate for thermal expansion. An axially extending housing aligned with the pipe and outside the reactor and an in-line reamer are provided for removing deposits from the inside of the pipe. The assembly enables fluid streams to be injected and distributed uniformly into the particle bed with minimized clogging of injector ports. The same design may also be used for extraction of fluid streams from particle bed reactors.

  13. Fast reactor power plant design having heat pipe heat exchanger

    DOEpatents

    Huebotter, P.R.; McLennan, G.A.

    1984-08-30

    The invention relates to a pool-type fission reactor power plant design having a reactor vessel containing a primary coolant (such as liquid sodium), and a steam expansion device powered by a pressurized water/steam coolant system. Heat pipe means are disposed between the primary and water coolants to complete the heat transfer therebetween. The heat pipes are vertically oriented, penetrating the reactor deck and being directly submerged in the primary coolant. A U-tube or line passes through each heat pipe, extended over most of the length of the heat pipe and having its walls spaced from but closely proximate to and generally facing the surrounding walls of the heat pipe. The water/steam coolant loop includes each U-tube and the steam expansion device. A heat transfer medium (such as mercury) fills each of the heat pipes. The thermal energy from the primary coolant is transferred to the water coolant by isothermal evaporation-condensation of the heat transfer medium between the heat pipe and U-tube walls, the heat transfer medium moving within the heat pipe primarily transversely between these walls.

  14. Fast reactor power plant design having heat pipe heat exchanger

    DOEpatents

    Huebotter, Paul R.; McLennan, George A.

    1985-01-01

    The invention relates to a pool-type fission reactor power plant design having a reactor vessel containing a primary coolant (such as liquid sodium), and a steam expansion device powered by a pressurized water/steam coolant system. Heat pipe means are disposed between the primary and water coolants to complete the heat transfer therebetween. The heat pipes are vertically oriented, penetrating the reactor deck and being directly submerged in the primary coolant. A U-tube or line passes through each heat pipe, extended over most of the length of the heat pipe and having its walls spaced from but closely proximate to and generally facing the surrounding walls of the heat pipe. The water/steam coolant loop includes each U-tube and the steam expansion device. A heat transfer medium (such as mercury) fills each of the heat pipes. The thermal energy from the primary coolant is transferred to the water coolant by isothermal evaporation-condensation of the heat transfer medium between the heat pipe and U-tube walls, the heat transfer medium moving within the heat pipe primarily transversely between these walls.

  15. Bacterial community radial-spatial distribution in biofilms along pipe wall in chlorinated drinking water distribution system of East China.

    PubMed

    Liu, Jingqing; Ren, Hongxing; Ye, Xianbei; Wang, Wei; Liu, Yan; Lou, Liping; Cheng, Dongqing; He, Xiaofang; Zhou, Xiaoyan; Qiu, Shangde; Fu, Liusong; Hu, Baolan

    2017-01-01

    Biofilms in the pipe wall may lead to water quality deterioration and biological instability in drinking water distribution systems (DWDSs). In this study, bacterial community radial-spatial distribution in biofilms along the pipe wall in a chlorinated DWDS of East China was investigated. Three pipes of large diameter (300, 600, and 600 mm) were sampled in this DWDS, including a ductile cast iron pipe (DCIP) with pipe age of 11 years and two gray cast iron pipes (GCIP) with pipe ages of 17 and 19 years, and biofilms in the upper, middle, and lower parts of each pipe wall were collected. Real-time quantitative polymerase chain reaction (qPCR) and culture-based method were used to quantify bacteria. 454 pyrosequencing was used for bacterial community analysis. The results showed that the biofilm density and total solid (TS) and volatile solid (VS) contents increased gradually from the top to the bottom along the pipe wall. Microorganisms were concentrated in the upper and lower parts of the pipe wall, together accounting for more than 80 % of the total biomass in the biofilms. The bacterial communities in biofilms were significantly different in different areas of the pipe wall and had no strong interaction. Compared with the upper and lower parts of the pipe wall, the bacterial community in the middle of the pipe wall was distributed evenly and had the highest diversity. The 16S rRNA genes of various possible pathogens, including Escherichia coli, Staphylococcus epidermidis, Pseudomonas aeruginosa, and Salmonella enterica, were detected in the biofilms, and the abundances of these possible pathogens were highest in the middle of the pipe wall among three areas. The detachment of the biofilms is the main reason for the deterioration of the water quality in DWDSs. The results of this study suggest that the biofilms in the middle of the pipe wall have highly potential risk for drinking water safety, which provides new ideas for the study of the microbial ecology in DWDS.

  16. Turbulence scalings in pipe flows exhibiting polymer-induced drag reduction

    NASA Astrophysics Data System (ADS)

    Zadrazil, Ivan; Markides, Christos

    2014-11-01

    Non-intrusive laser based diagnostics technique, namely Particle Image Velocimetry, was used to in detail characterise polymer induced drag reduction in a turbulent pipe flow. The effect of polymer additives was investigated in a pneumatically-driven flow facility featuring a horizontal pipe test section of inner diameter 25.3 mm and length 8 m. Three high molecular weight polymers (2, 4 and 8 MDa) at concentrations of 5 - 250 wppm were used at Reynolds numbers from 35000 to 210000. The PIV derived results show that the level of drag reduction scales with different normalised turbulence parameters, e.g. streamwise and spanwise velocity fluctuations, vorticity or Reynolds stresses. These scalings are dependent of the distance from the wall, however, are independent of the Reynolds numbers range investigated.

  17. Effect of Water Cut on Pressure Drop of Oil (D130) -Water Flow in 4″Horizontal Pipe

    NASA Astrophysics Data System (ADS)

    Basha, Mehaboob; Shaahid, S. M.; Al-Hems, Luai M.

    2018-03-01

    The oil-water flow in pipes is a challenging subject that is rich in physics and practical applications. It is often encountered in many oil and chemical industries. The pressure gradient of two phase flow is still subject of immense research. The present study reports pressure measurements of oil (D130)-water flow in a horizontal 4″ diameter stainless steel pipe at different flow conditions. Experiments were carried out for different water cuts (WC); 0-100%. Inlet oil-water flow rates were varied from 4000 to 8000 barrels-per-day in steps of 2000. It has been found that the frictional pressure drop decreases for WC = 0 - 40 %. With further increase in WC, friction pressure drop increases, this could be due to phase inversion.

  18. Thin Wall Pipe Ultrasonic Inspection through Paint Coating

    NASA Astrophysics Data System (ADS)

    Predoi, Mihai Valentin; Petre, Cristian Cătălin

    Classical ultrasonic inspection of welds is currently done for plates thicker than 8 mm. The inspection of but welds in thin walled pipes has considerable implementation difficulties, due to guided waves dominating ultrasonic pulses propagation. Generation of purely symmetric modes, either torsional or longitudinal, requires a circumferential uniform distribution of transducers and dedicated inspection equipment, which are increasing the inspection costs. Moreover, if the surface is paint coated, the received signals are close to the detection level. The present work implies a single transducer, coupled to the painted surface. The proper choice of the guided mode and frequency range, allows the detection of a standard, small diameter through thickness hole. In this way, the inspection of pipe welds can use the same equipment as for thick materials, with only wedge adaptation.

  19. Multicriteria optimization approach to design and operation of district heating supply system over its life cycle

    NASA Astrophysics Data System (ADS)

    Hirsch, Piotr; Duzinkiewicz, Kazimierz; Grochowski, Michał

    2017-11-01

    District Heating (DH) systems are commonly supplied using local heat sources. Nowadays, modern insulation materials allow for effective and economically viable heat transportation over long distances (over 20 km). In the paper a method for optimized selection of design and operating parameters of long distance Heat Transportation System (HTS) is proposed. The method allows for evaluation of feasibility and effectivity of heat transportation from the considered heat sources. The optimized selection is formulated as multicriteria decision-making problem. The constraints for this problem include a static HTS model, allowing considerations of system life cycle, time variability and spatial topology. Thereby, variation of heat demand and ground temperature within the DH area, insulation and pipe aging and/or terrain elevation profile are taken into account in the decision-making process. The HTS construction costs, pumping power, and heat losses are considered as objective functions. Inner pipe diameter, insulation thickness, temperatures and pumping stations locations are optimized during the decision-making process. Moreover, the variants of pipe-laying e.g. one pipeline with the larger diameter or two with the smaller might be considered during the optimization. The analyzed optimization problem is multicriteria, hybrid and nonlinear. Because of such problem properties, the genetic solver was applied.

  20. Assessment of flood hazard in a combined sewer system in Reykjavik city centre.

    PubMed

    Hlodversdottir, Asta Osk; Bjornsson, Brynjolfur; Andradottir, Hrund Olof; Eliasson, Jonas; Crochet, Philippe

    2015-01-01

    Short-duration precipitation bursts can cause substantial property damage and pose operational risks for wastewater managers. The objective of this study was to assess the present and possible future flood hazard in the combined sewer system in Reykjavik city centre. The catchment is characterised by two hills separated by a plain. A large portion of the pipes in the aging network are smaller than the current minimum diameter of 250 mm. Runoff and sewer flows were modelled using the MIKE URBAN software package incorporating both historical precipitation and synthetic storms derived from annual maximum rainfall data. Results suggest that 3% of public network manholes were vulnerable to flooding during an 11-year long rainfall sequence. A Chicago Design Storm (CDS) incorporating a 10-minute rainfall burst with a 5-year return period predicted twice as many flooded manholes at similar locations. A 20% increase in CDS intensity increased the number of flooded manholes and surface flood volume by 70% and 80%, respectively. The flood volume tripled if rainfall increase were combined with urban re-development, leading to a 20% increase in the runoff coefficient. Results highlight the need for reducing network vulnerabilities, which include decreased pipe diameters and low or drastically varying pipe grades.