Sample records for distributed fair scheduling

  1. Geometric Distribution-Based Readers Scheduling Optimization Algorithm Using Artificial Immune System.

    PubMed

    Duan, Litian; Wang, Zizhong John; Duan, Fu

    2016-11-16

    In the multiple-reader environment (MRE) of radio frequency identification (RFID) system, multiple readers are often scheduled to interrogate the randomized tags via operating at different time slots or frequency channels to decrease the signal interferences. Based on this, a Geometric Distribution-based Multiple-reader Scheduling Optimization Algorithm using Artificial Immune System (GD-MRSOA-AIS) is proposed to fairly and optimally schedule the readers operating from the viewpoint of resource allocations. GD-MRSOA-AIS is composed of two parts, where a geometric distribution function combined with the fairness consideration is first introduced to generate the feasible scheduling schemes for reader operation. After that, artificial immune system (including immune clone, immune mutation and immune suppression) quickly optimize these feasible ones as the optimal scheduling scheme to ensure that readers are fairly operating with larger effective interrogation range and lower interferences. Compared with the state-of-the-art algorithm, the simulation results indicate that GD-MRSOA-AIS could efficiently schedules the multiple readers operating with a fairer resource allocation scheme, performing in larger effective interrogation range.

  2. Geometric Distribution-Based Readers Scheduling Optimization Algorithm Using Artificial Immune System

    PubMed Central

    Duan, Litian; Wang, Zizhong John; Duan, Fu

    2016-01-01

    In the multiple-reader environment (MRE) of radio frequency identification (RFID) system, multiple readers are often scheduled to interrogate the randomized tags via operating at different time slots or frequency channels to decrease the signal interferences. Based on this, a Geometric Distribution-based Multiple-reader Scheduling Optimization Algorithm using Artificial Immune System (GD-MRSOA-AIS) is proposed to fairly and optimally schedule the readers operating from the viewpoint of resource allocations. GD-MRSOA-AIS is composed of two parts, where a geometric distribution function combined with the fairness consideration is first introduced to generate the feasible scheduling schemes for reader operation. After that, artificial immune system (including immune clone, immune mutation and immune suppression) quickly optimize these feasible ones as the optimal scheduling scheme to ensure that readers are fairly operating with larger effective interrogation range and lower interferences. Compared with the state-of-the-art algorithm, the simulation results indicate that GD-MRSOA-AIS could efficiently schedules the multiple readers operating with a fairer resource allocation scheme, performing in larger effective interrogation range. PMID:27854342

  3. Fair Energy Scheduling for Vehicle-to-Grid Networks Using Adaptive Dynamic Programming.

    PubMed

    Xie, Shengli; Zhong, Weifeng; Xie, Kan; Yu, Rong; Zhang, Yan

    2016-08-01

    Research on the smart grid is being given enormous supports worldwide due to its great significance in solving environmental and energy crises. Electric vehicles (EVs), which are powered by clean energy, are adopted increasingly year by year. It is predictable that the huge charge load caused by high EV penetration will have a considerable impact on the reliability of the smart grid. Therefore, fair energy scheduling for EV charge and discharge is proposed in this paper. By using the vehicle-to-grid technology, the scheduler controls the electricity loads of EVs considering fairness in the residential distribution network. We propose contribution-based fairness, in which EVs with high contributions have high priorities to obtain charge energy. The contribution value is defined by both the charge/discharge energy and the timing of the action. EVs can achieve higher contribution values when discharging during the load peak hours. However, charging during this time will decrease the contribution values seriously. We formulate the fair energy scheduling problem as an infinite-horizon Markov decision process. The methodology of adaptive dynamic programming is employed to maximize the long-term fairness by processing online network training. The numerical results illustrate that the proposed EV energy scheduling is able to mitigate and flatten the peak load in the distribution network. Furthermore, contribution-based fairness achieves a fast recovery of EV batteries that have deeply discharged and guarantee fairness in the full charge time of all EVs.

  4. Real-time distributed scheduling algorithm for supporting QoS over WDM networks

    NASA Astrophysics Data System (ADS)

    Kam, Anthony C.; Siu, Kai-Yeung

    1998-10-01

    Most existing or proposed WDM networks employ circuit switching, typically with one session having exclusive use of one entire wavelength. Consequently they are not suitable for data applications involving bursty traffic patterns. The MIT AON Consortium has developed an all-optical LAN/MAN testbed which provides time-slotted WDM service and employs fast-tunable transceivers in each optical terminal. In this paper, we explore extensions of this service to achieve fine-grained statistical multiplexing with different virtual circuits time-sharing the wavelengths in a fair manner. In particular, we develop a real-time distributed protocol for best-effort traffic over this time-slotted WDM service with near-optical fairness and throughput characteristics. As an additional design feature, our protocol supports the allocation of guaranteed bandwidths to selected connections. This feature acts as a first step towards supporting integrated services and quality-of-service guarantees over WDM networks. To achieve high throughput, our approach is based on scheduling transmissions, as opposed to collision- based schemes. Our distributed protocol involves one MAN scheduler and several LAN schedulers (one per LAN) in a master-slave arrangement. Because of propagation delays and limits on control channel capacities, all schedulers are designed to work with partial, delayed traffic information. Our distributed protocol is of the `greedy' type to ensure fast execution in real-time in response to dynamic traffic changes. It employs a hybrid form of rate and credit control for resource allocation. We have performed extensive simulations, which show that our protocol allocates resources (transmitters, receivers, wavelengths) fairly with high throughput, and supports bandwidth guarantees.

  5. QoS support over ultrafast TDM optical networks

    NASA Astrophysics Data System (ADS)

    Narvaez, Paolo; Siu, Kai-Yeung; Finn, Steven G.

    1999-08-01

    HLAN is a promising architecture to realize Tb/s access networks based on ultra-fast optical TDM technologies. This paper presents new research results on efficient algorithms for the support of quality of service over the HLAN network architecture. In particular, we propose a new scheduling algorithm that emulates fair queuing in a distributed manner for bandwidth allocation purpose. The proposed scheduler collects information on the queue of each host on the network and then instructs each host how much data to send. Our new scheduling algorithm ensures full bandwidth utilization, while guaranteeing fairness among all hosts.

  6. Scheduling nurses’ shifts at PGI Cikini Hospital

    NASA Astrophysics Data System (ADS)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  7. Back pressure based multicast scheduling for fair bandwidth allocation.

    PubMed

    Sarkar, Saswati; Tassiulas, Leandros

    2005-09-01

    We study the fair allocation of bandwidth in multicast networks with multirate capabilities. In multirate transmission, each source encodes its signal in layers. The lowest layer contains the most important information and all receivers of a session should receive it. If a receiver's data path has additional bandwidth, it receives higher layers which leads to a better quality of reception. The bandwidth allocation objective is to distribute the layers fairly. We present a computationally simple, decentralized scheduling policy that attains the maxmin fair rates without using any knowledge of traffic statistics and layer bandwidths. This policy learns the congestion level from the queue lengths at the nodes, and adapts the packet transmissions accordingly. When the network is congested, packets are dropped from the higher layers; therefore, the more important lower layers suffer negligible packet loss. We present analytical and simulation results that guarantee the maxmin fairness of the resulting rate allocation, and upper bound the packet loss rates for different layers.

  8. Adaptive Subframe Partitioning and Efficient Packet Scheduling in OFDMA Cellular System with Fixed Decode-and-Forward Relays

    NASA Astrophysics Data System (ADS)

    Wang, Liping; Ji, Yusheng; Liu, Fuqiang

    The integration of multihop relays with orthogonal frequency-division multiple access (OFDMA) cellular infrastructures can meet the growing demands for better coverage and higher throughput. Resource allocation in the OFDMA two-hop relay system is more complex than that in the conventional single-hop OFDMA system. With time division between transmissions from the base station (BS) and those from relay stations (RSs), fixed partitioning of the BS subframe and RS subframes can not adapt to various traffic demands. Moreover, single-hop scheduling algorithms can not be used directly in the two-hop system. Therefore, we propose a semi-distributed algorithm called ASP to adjust the length of every subframe adaptively, and suggest two ways to extend single-hop scheduling algorithms into multihop scenarios: link-based and end-to-end approaches. Simulation results indicate that the ASP algorithm increases system utilization and fairness. The max carrier-to-interference ratio (Max C/I) and proportional fairness (PF) scheduling algorithms extended using the end-to-end approach obtain higher throughput than those using the link-based approach, but at the expense of more overhead for information exchange between the BS and RSs. The resource allocation scheme using ASP and end-to-end PF scheduling achieves a tradeoff between system throughput maximization and fairness.

  9. Proportional fair scheduling algorithm based on traffic in satellite communication system

    NASA Astrophysics Data System (ADS)

    Pan, Cheng-Sheng; Sui, Shi-Long; Liu, Chun-ling; Shi, Yu-Xin

    2018-02-01

    In the satellite communication network system, in order to solve the problem of low system capacity and user fairness in multi-user access to satellite communication network in the downlink, combined with the characteristics of user data service, an algorithm study on throughput capacity and user fairness scheduling is proposed - Proportional Fairness Algorithm Based on Traffic(B-PF). The algorithm is improved on the basis of the proportional fairness algorithm in the wireless communication system, taking into account the user channel condition and caching traffic information. The user outgoing traffic is considered as the adjustment factor of the scheduling priority and presents the concept of traffic satisfaction. Firstly,the algorithm calculates the priority of the user according to the scheduling algorithm and dispatches the users with the highest priority. Secondly, when a scheduled user is the business satisfied user, the system dispatches the next priority user. The simulation results show that compared with the PF algorithm, B-PF can improve the system throughput, the business satisfaction and fairness.

  10. PWFQ: a priority-based weighted fair queueing algorithm for the downstream transmission of EPON

    NASA Astrophysics Data System (ADS)

    Xu, Sunjuan; Ye, Jiajun; Zou, Junni

    2005-11-01

    In the downstream direction of EPON, all ethernet frames share one downlink channel from the OLT to destination ONUs. To guarantee differentiated services, a scheduling algorithm is needed to solve the link-sharing issue. In this paper, we first review the classical WFQ algorithm and point out the shortcomings existing in the fair queueing principle of WFQ algorithm for EPON. Then we propose a novel scheduling algorithm called Priority-based WFQ (PWFQ) algorithm which distributes bandwidth based on priority. PWFQ algorithm can guarantee the quality of real-time services whether under light load or under heavy load. Simulation results also show that PWFQ algorithm not only can improve delay performance of real-time services, but can also meet the worst-case delay bound requirements.

  11. Peer-to-peer Cooperative Scheduling Architecture for National Grid Infrastructure

    NASA Astrophysics Data System (ADS)

    Matyska, Ludek; Ruda, Miroslav; Toth, Simon

    For some ten years, the Czech National Grid Infrastructure MetaCentrum uses a single central PBSPro installation to schedule jobs across the country. This centralized approach keeps a full track about all the clusters, providing support for jobs spanning several sites, implementation for the fair-share policy and better overall control of the grid environment. Despite a steady progress in the increased stability and resilience to intermittent very short network failures, growing number of sites and processors makes this architecture, with a single point of failure and scalability limits, obsolete. As a result, a new scheduling architecture is proposed, which relies on higher autonomy of clusters. It is based on a peer to peer network of semi-independent schedulers for each site or even cluster. Each scheduler accepts jobs for the whole infrastructure, cooperating with other schedulers on implementation of global policies like central job accounting, fair-share, or submission of jobs across several sites. The scheduling system is integrated with the Magrathea system to support scheduling of virtual clusters, including the setup of their internal network, again eventually spanning several sites. On the other hand, each scheduler is local to one of several clusters and is able to directly control and submit jobs to them even if the connection of other scheduling peers is lost. In parallel to the change of the overall architecture, the scheduling system itself is being replaced. Instead of PBSPro, chosen originally for its declared support of large scale distributed environment, the new scheduling architecture is based on the open-source Torque system. The implementation and support for the most desired properties in PBSPro and Torque are discussed and the necessary modifications to Torque to support the MetaCentrum scheduling architecture are presented, too.

  12. Modified Parameters of Harmony Search Algorithm for Better Searching

    NASA Astrophysics Data System (ADS)

    Farraliza Mansor, Nur; Abal Abas, Zuraida; Samad Shibghatullah, Abdul; Rahman, Ahmad Fadzli Nizam Abdul

    2017-08-01

    The scheduling and rostering problems are deliberated as integrated due to they depend on each other whereby the input of rostering problems is a scheduling problems. In this research, the integrated scheduling and rostering bus driver problems are defined as maximising the balance of the assignment of tasks in term of distribution of shifts and routes. It is essential to achieve is fairer among driver because this can bring to increase in driver levels of satisfaction. The latest approaches still unable to address the fairness problem that has emerged, thus this research proposes a strategy to adopt an amendment of a harmony search algorithm in order to address the fairness issue and thus the level of fairness will be escalate. The harmony search algorithm is classified as a meta-heuristics algorithm that is capable of solving hard and combinatorial or discrete optimisation problems. In this respect, the three main operators in HS, namely the Harmony Memory Consideration Rate (HMCR), Pitch Adjustment Rate (PAR) and Bandwidth (BW) play a vital role in balancing local exploitation and global exploration. These parameters influence the overall performance of the HS algorithm, and therefore it is crucial to fine-tune them. The contributions to this research are the HMCR parameter using step function while the fret spacing concept on guitars that is associated with mathematical formulae is also applied in the BW parameter. The model of constant step function is introduced in the alteration of HMCR parameter. The experimental results revealed that our proposed approach is superior than parameter adaptive harmony search algorithm. In conclusion, this proposed approach managed to generate a fairer roster and was thus capable of maximising the balancing distribution of shifts and routes among drivers, which contributed to the lowering of illness, incidents, absenteeism and accidents.

  13. Scheduling Algorithms for Maximizing Throughput with Zero-Forcing Beamforming in a MIMO Wireless System

    NASA Astrophysics Data System (ADS)

    Foronda, Augusto; Ohta, Chikara; Tamaki, Hisashi

    Dirty paper coding (DPC) is a strategy to achieve the region capacity of multiple input multiple output (MIMO) downlink channels and a DPC scheduler is throughput optimal if users are selected according to their queue states and current rates. However, DPC is difficult to implement in practical systems. One solution, zero-forcing beamforming (ZFBF) strategy has been proposed to achieve the same asymptotic sum rate capacity as that of DPC with an exhaustive search over the entire user set. Some suboptimal user group selection schedulers with reduced complexity based on ZFBF strategy (ZFBF-SUS) and proportional fair (PF) scheduling algorithm (PF-ZFBF) have also been proposed to enhance the throughput and fairness among the users, respectively. However, they are not throughput optimal, fairness and throughput decrease if each user queue length is different due to different users channel quality. Therefore, we propose two different scheduling algorithms: a throughput optimal scheduling algorithm (ZFBF-TO) and a reduced complexity scheduling algorithm (ZFBF-RC). Both are based on ZFBF strategy and, at every time slot, the scheduling algorithms have to select some users based on user channel quality, user queue length and orthogonality among users. Moreover, the proposed algorithms have to produce the rate allocation and power allocation for the selected users based on a modified water filling method. We analyze the schedulers complexity and numerical results show that ZFBF-RC provides throughput and fairness improvements compared to the ZFBF-SUS and PF-ZFBF scheduling algorithms.

  14. KSC-99pp0718

    NASA Image and Video Library

    1999-06-19

    At Launch Pad 17A, Cape Canaveral Air Station, workers oversee the lifting of the fairing (right) into the tower. At left is NASA's Far Ultraviolet Spectroscopic Explorer (FUSE) satellite around which the fairing will be fitted. The satellite is scheduled for launch June 24 aboard a Boeing Delta II rocket. FUSE is designed to scour the cosmos for the fossil record of the origins of the universe hydrogen and deuterium. Scientists will use FUSE to study hydrogen and deuterium to unlock the secrets of how the primordial chemical elements of which all stars, planets and life evolved, were created and distributed since the birth of the universe

  15. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  16. Goal programming for cyclical auxiliary police scheduling at UiTM Cawangan Perlis

    NASA Astrophysics Data System (ADS)

    Mustapar, Wasilatul Effah; Nasir, Diana Sirmayunie Mohd; Nor, Nor Azriani Mohamad; Abas, Sharifah Fhahriyah Syed

    2017-11-01

    Constructing a good and fair schedule for shift workers poses a great challenge as it requires a lot of time and effort. In this study, goal programming has been applied on scheduling to achieve the hard and soft constraints for a cyclical schedule that would ease the head of auxiliary police at building new schedules. To accomplish this goal, shift types were assigned in order to provide a fair schedule that takes into account the auxiliary police's policies and preferences. The model was run using Lingo software. Three out of four goals set for the study were achieved. In addition, the results considered an equal allocation for every auxiliary police, namely 70% for total duty and 30% for the day. Furthermore, the schedule was able to cyclically generate another 10 sets schedule. More importantly, the model has provided unbiased scheduling of auxiliary policies which led to high satisfaction in auxiliary police management.

  17. KSC-2009-1590

    NASA Image and Video Library

    2009-02-09

    VANDENBERG AIR FORCE BASE, Calif. -- The second half of the fairing is prepared for installation around NASA's Orbiting Carbon Observatory, or OCO, at Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. The spacecraft is scheduled for launch aboard Orbital Sciences' Taurus XL rocket on Feb. 23 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. This improved understanding will enable more reliable forecasts of future changes in the abundance and distribution of CO2 in the atmosphere and the effect that these changes may have on the Earth's climate. Photo credit: NASA/Robert Hargreaves Jr., VAFB

  18. KSC-2009-1589

    NASA Image and Video Library

    2009-02-09

    VANDENBERG AIR FORCE BASE, Calif. -- The first half of the fairing is placed around NASA's Orbiting Carbon Observatory, or OCO, at Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. The spacecraft is scheduled for launch aboard Orbital Sciences' Taurus XL rocket on Feb. 23 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. This improved understanding will enable more reliable forecasts of future changes in the abundance and distribution of CO2 in the atmosphere and the effect that these changes may have on the Earth's climate. Photo credit: NASA/Robert Hargreaves Jr., VAFB

  19. KSC-2009-1719

    NASA Image and Video Library

    2009-02-18

    VANDENBERG AIR FORCE BASE, Calif. -- On Launch Complex 576-E at Vandenberg Air Force Base in California, Orbital Science's Jose Castillo and Mark Neuse (right) move in to remove the fairing payload access door on NASA's Orbiting Carbon Observatory, or OCO, spacecraft. Orbital Science's Glenn Weigle and Brett Gladish are nearby (shadows on the fairing) to take the GN2 flow reading. The encapsulated OCO tops Orbital Sciences' Taurus XL rocket, which is scheduled to launch Feb. 24. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. Photo courtesy of Glenn Weigle, Orbital Sciences

  20. KSC-2009-1720

    NASA Image and Video Library

    2009-02-18

    VANDENBERG AIR FORCE BASE, Calif. -- With the fairing door off, Orbital Science's Jose Castillo and Mark Neuse remove the fairing payload access door on NASA's Orbiting Carbon Observatory, or OCO, spacecraft on Launch Complex 576-E at Vandenberg Air Force Base in California. Orbital Science's Glenn Weigle and Brett Gladish stand by to take the GN2 flow reading The encapsulated OCO tops Orbital Sciences' Taurus XL rocket, which is scheduled to launch Feb. 24. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. Photo courtesy of Glenn Weigle, Orbital Sciences

  1. New preemptive scheduling for OBS networks considering cascaded wavelength conversion

    NASA Astrophysics Data System (ADS)

    Gao, Xingbo; Bassiouni, Mostafa A.; Li, Guifang

    2009-05-01

    In this paper we introduce a new preemptive scheduling technique for next generation optical burst-switched networks considering the impact of cascaded wavelength conversions. It has been shown that when optical bursts are transmitted all optically from source to destination, each wavelength conversion performed along the lightpath may cause certain signal-to-noise deterioration. If the distortion of the signal quality becomes significant enough, the receiver would not be able to recover the original data. Accordingly, subject to this practical impediment, we improve a recently proposed fair channel scheduling algorithm to deal with the fairness problem and aim at burst loss reduction simultaneously in optical burst switching. In our scheme, the dynamic priority associated with each burst is based on a constraint threshold and the number of already conducted wavelength conversions among other factors for this burst. When contention occurs, a new arriving superior burst may preempt another scheduled one according to their priorities. Extensive simulation results have shown that the proposed scheme further improves fairness and achieves burst loss reduction as well.

  2. A novel LTE scheduling algorithm for green technology in smart grid.

    PubMed

    Hindia, Mohammad Nour; Reza, Ahmed Wasif; Noordin, Kamarul Ariffin; Chayon, Muhammad Hasibur Rashid

    2015-01-01

    Smart grid (SG) application is being used nowadays to meet the demand of increasing power consumption. SG application is considered as a perfect solution for combining renewable energy resources and electrical grid by means of creating a bidirectional communication channel between the two systems. In this paper, three SG applications applicable to renewable energy system, namely, distribution automation (DA), distributed energy system-storage (DER) and electrical vehicle (EV), are investigated in order to study their suitability in Long Term Evolution (LTE) network. To compensate the weakness in the existing scheduling algorithms, a novel bandwidth estimation and allocation technique and a new scheduling algorithm are proposed. The technique allocates available network resources based on application's priority, whereas the algorithm makes scheduling decision based on dynamic weighting factors of multi-criteria to satisfy the demands (delay, past average throughput and instantaneous transmission rate) of quality of service. Finally, the simulation results demonstrate that the proposed mechanism achieves higher throughput, lower delay and lower packet loss rate for DA and DER as well as provide a degree of service for EV. In terms of fairness, the proposed algorithm shows 3%, 7 % and 9% better performance compared to exponential rule (EXP-Rule), modified-largest weighted delay first (M-LWDF) and exponential/PF (EXP/PF), respectively.

  3. A Novel LTE Scheduling Algorithm for Green Technology in Smart Grid

    PubMed Central

    Hindia, Mohammad Nour; Reza, Ahmed Wasif; Noordin, Kamarul Ariffin; Chayon, Muhammad Hasibur Rashid

    2015-01-01

    Smart grid (SG) application is being used nowadays to meet the demand of increasing power consumption. SG application is considered as a perfect solution for combining renewable energy resources and electrical grid by means of creating a bidirectional communication channel between the two systems. In this paper, three SG applications applicable to renewable energy system, namely, distribution automation (DA), distributed energy system-storage (DER) and electrical vehicle (EV), are investigated in order to study their suitability in Long Term Evolution (LTE) network. To compensate the weakness in the existing scheduling algorithms, a novel bandwidth estimation and allocation technique and a new scheduling algorithm are proposed. The technique allocates available network resources based on application’s priority, whereas the algorithm makes scheduling decision based on dynamic weighting factors of multi-criteria to satisfy the demands (delay, past average throughput and instantaneous transmission rate) of quality of service. Finally, the simulation results demonstrate that the proposed mechanism achieves higher throughput, lower delay and lower packet loss rate for DA and DER as well as provide a degree of service for EV. In terms of fairness, the proposed algorithm shows 3%, 7 % and 9% better performance compared to exponential rule (EXP-Rule), modified-largest weighted delay first (M-LWDF) and exponential/PF (EXP/PF), respectively. PMID:25830703

  4. Chip-set for quality of service support in passive optical networks

    NASA Astrophysics Data System (ADS)

    Ringoot, Edwin; Hoebeke, Rudy; Slabbinck, B. Hans; Verhaert, Michel

    1998-10-01

    In this paper the design of a chip-set for QoS provisioning in ATM-based Passive Optical Networks is discussed. The implementation of a general-purpose switch chip on the Optical Network Unit is presented, with focus on the design of the cell scheduling and buffer management logic. The cell scheduling logic supports `colored' grants, priority jumping and weighted round-robin scheduling. The switch chip offers powerful buffer management capabilities enabling the efficient support of GFR and UBR services. Multicast forwarding is also supported. In addition, the architecture of a MAC controller chip developed for a SuperPON access network is introduced. In particular, the permit scheduling logic and its implementation on the Optical Line Termination will be discussed. The chip-set enables the efficient support of services with different service requirements on the SuperPON. The permit scheduling logic built into the MAC controller chip in combination with the cell scheduling and buffer management capabilities of the switch chip can be used by network operators to offer guaranteed service performance to delay sensitive services, and to efficiently and fairly distribute any spare capacity to delay insensitive services.

  5. KSC-2009-1594

    NASA Image and Video Library

    2009-02-09

    VANDENBERG AIR FORCE BASE, Calif. -- Workers check the movement of the fairing at right toward NASA's Orbiting Carbon Observatory, or OCO, at left, to complete installation. The work is being done in Building 1032 of Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. The spacecraft is scheduled for launch aboard Orbital Sciences' Taurus XL rocket on Feb. 23 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. This improved understanding will enable more reliable forecasts of future changes in the abundance and distribution of CO2 in the atmosphere and the effect that these changes may have on the Earth's climate. Photo credit: NASA/Robert Hargreaves Jr., VAFB

  6. KSC-2009-1595

    NASA Image and Video Library

    2009-02-09

    VANDENBERG AIR FORCE BASE, Calif. -- Workers secure the installation of the fairing around NASA's Orbiting Carbon Observatory, or OCO. The work is being done in Building 1032 of Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. The spacecraft is scheduled for launch aboard Orbital Sciences' Taurus XL rocket on Feb. 23 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. This improved understanding will enable more reliable forecasts of future changes in the abundance and distribution of CO2 in the atmosphere and the effect that these changes may have on the Earth's climate. Photo credit: NASA/Robert Hargreaves Jr., VAFB

  7. KSC-2009-1591

    NASA Image and Video Library

    2009-02-09

    VANDENBERG AIR FORCE BASE, Calif. -- At left, the second half of the fairing is moved toward NASA's Orbiting Carbon Observatory, or OCO, at right, for installation. The work is being done in Building 1032 of Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. The spacecraft is scheduled for launch aboard Orbital Sciences' Taurus XL rocket on Feb. 23 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. This improved understanding will enable more reliable forecasts of future changes in the abundance and distribution of CO2 in the atmosphere and the effect that these changes may have on the Earth's climate. Photo credit: NASA/Robert Hargreaves Jr., VAFB

  8. KSC-2009-1593

    NASA Image and Video Library

    2009-02-09

    VANDENBERG AIR FORCE BASE, Calif. -- – Workers check the movement of the fairing at right toward NASA's Orbiting Carbon Observatory, or OCO, at left, to complete installation. The work is being done in Building 1032 of Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. The spacecraft is scheduled for launch aboard Orbital Sciences' Taurus XL rocket on Feb. 23 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. This improved understanding will enable more reliable forecasts of future changes in the abundance and distribution of CO2 in the atmosphere and the effect that these changes may have on the Earth's climate. Photo credit: NASA/Robert Hargreaves Jr., VAFB

  9. KSC-2009-1592

    NASA Image and Video Library

    2009-02-09

    VANDENBERG AIR FORCE BASE, Calif. -- The second half of the fairing, at right, is moved closer to NASA's Orbiting Carbon Observatory, or OCO, at left, to complete installation. The work is being done in Building 1032 of Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. The spacecraft is scheduled for launch aboard Orbital Sciences' Taurus XL rocket on Feb. 23 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. This improved understanding will enable more reliable forecasts of future changes in the abundance and distribution of CO2 in the atmosphere and the effect that these changes may have on the Earth's climate. Photo credit: NASA/Robert Hargreaves Jr., VAFB

  10. Effective preemptive scheduling scheme for optical burst-switched networks with cascaded wavelength conversion consideration

    NASA Astrophysics Data System (ADS)

    Gao, Xingbo

    2010-03-01

    We introduce a new preemptive scheduling technique for next-generation optical burst switching (OBS) networks considering the impact of cascaded wavelength conversions. It has been shown that when optical bursts are transmitted all optically from source to destination, each wavelength conversion performed along the lightpath may cause certain signal-to-noise deterioration. If the distortion of the signal quality becomes significant enough, the receiver would not be able to recover the original data. Accordingly, subject to this practical impediment, we improve a recently proposed fair channel scheduling algorithm to deal with the fairness problem and aim at burst loss reduction simultaneously in OBS environments. In our scheme, the dynamic priority associated with each burst is based on a constraint threshold and the number of already conducted wavelength conversions among other factors for this burst. When contention occurs, a new arriving superior burst may preempt another scheduled one according to their priorities. Extensive simulation results have shown that the proposed scheme further improves fairness and achieves burst loss reduction as well.

  11. Modified weighted fair queuing for packet scheduling in mobile WiMAX networks

    NASA Astrophysics Data System (ADS)

    Satrya, Gandeva B.; Brotoharsono, Tri

    2013-03-01

    The increase of user mobility and the need for data access anytime also increases the interest in broadband wireless access (BWA). The best available quality of experience for mobile data service users are assured for IEEE 802.16e based users. The main problem of assuring a high QOS value is how to allocate available resources among users in order to meet the QOS requirement for criteria such as delay, throughput, packet loss and fairness. There is no specific standard scheduling mechanism stated by IEEE standards, which leaves it for implementer differentiation. There are five QOS service classes defined by IEEE 802.16: Unsolicited Grant Scheme (UGS), Extended Real Time Polling Service (ertPS), Real Time Polling Service (rtPS), Non Real Time Polling Service (nrtPS) and Best Effort Service (BE). Each class has different QOS parameter requirements for throughput and delay/jitter constraints. This paper proposes Modified Weighted Fair Queuing (MWFQ) scheduling scenario which was based on Weighted Round Robin (WRR) and Weighted Fair Queuing (WFQ). The performance of MWFQ was assessed by using above five QoS criteria. The simulation shows that using the concept of total packet size calculation improves the network's performance.

  12. Optimal Scheduling and Fair Service Policy for STDMA in Underwater Networks with Acoustic Communications

    PubMed Central

    2018-01-01

    In this work, a multi-hop string network with a single sink node is analyzed. A periodic optimal scheduling for TDMA operation that considers the characteristic long propagation delay of the underwater acoustic channel is presented. This planning of transmissions is obtained with the help of a new geometrical method based on a 2D lattice in the space-time domain. In order to evaluate the performance of this optimal scheduling, two service policies have been compared: FIFO and Round-Robin. Simulation results, including achievable throughput, packet delay, and queue length, are shown. The network fairness has also been quantified with the Gini index. PMID:29462966

  13. Scheduling, revenue management, and fairness in an academic-hospital radiology division.

    PubMed

    Baum, Richard; Bertsimas, Dimitris; Kallus, Nathan

    2014-10-01

    Physician staff of academic hospitals today practice in several geographic locations including their main hospital. This is referred to as the extended campus. With extended campuses expanding, the growing complexity of a single division's schedule means that a naive approach to scheduling compromises revenue. Moreover, it may provide an unfair allocation of individual revenue, desirable or burdensome assignments, and the extent to which the preferences of each individual are met. This has adverse consequences on incentivization and employee satisfaction and is simply against business policy. We identify the daily scheduling of physicians in this context as an operational problem that incorporates scheduling, revenue management, and fairness. Noting previous success of operations research and optimization in each of these disciplines, we propose a simple unified optimization formulation of this scheduling problem using mixed-integer optimization. Through a study of implementing the approach at the Division of Angiography and Interventional Radiology at the Brigham and Women's Hospital, which is directed by one of the authors, we exemplify the flexibility of the model to adapt to specific applications, the tractability of solving the model in practical settings, and the significant impact of the approach, most notably in increasing revenue by 8.2% over previous operating revenue while adhering strictly to a codified fairness and objectivity. We found that the investment in implementing such a system is far outweighed by the large potential revenue increase and the other benefits outlined. Copyright © 2014 AUR. Published by Elsevier Inc. All rights reserved.

  14. KSC-99pp0717

    NASA Image and Video Library

    1999-06-19

    NASA's Far Ultraviolet Spectroscopic Explorer (FUSE) satellite sits ready for the fairing installation at Launch Pad 17A, Cape Canaveral Air Station. The satellite is scheduled for launch June 24 aboard a Boeing Delta II rocket. FUSE is designed to scour the cosmos for the fossil record of the origins of the universe hydrogen and deuterium. Scientists will use FUSE to study hydrogen and deuterium to unlock the secrets of how the primordial chemical elements of which all stars, planets and life evolved, were created and distributed since the birth of the universe

  15. 39 CFR 266.8 - Schedule of fees.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Schedule of fees. 266.8 Section 266.8 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION PRIVACY OF INFORMATION § 266.8 Schedule of fees. (a) Policy. The purpose of this section is to establish fair and equitable fees to permit...

  16. 39 CFR 266.8 - Schedule of fees.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Schedule of fees. 266.8 Section 266.8 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION PRIVACY OF INFORMATION § 266.8 Schedule of fees. (a) Policy. The purpose of this section is to establish fair and equitable fees to permit...

  17. 39 CFR 266.8 - Schedule of fees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Schedule of fees. 266.8 Section 266.8 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION PRIVACY OF INFORMATION § 266.8 Schedule of fees. (a) Policy. The purpose of this section is to establish fair and equitable fees to permit...

  18. 39 CFR 266.8 - Schedule of fees.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Schedule of fees. 266.8 Section 266.8 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION PRIVACY OF INFORMATION § 266.8 Schedule of fees. (a) Policy. The purpose of this section is to establish fair and equitable fees to permit...

  19. 39 CFR 266.8 - Schedule of fees.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Schedule of fees. 266.8 Section 266.8 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION PRIVACY OF INFORMATION § 266.8 Schedule of fees. (a) Policy. The purpose of this section is to establish fair and equitable fees to permit...

  20. 29 CFR 2400.10 - Schedule of fees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Schedule of fees. 2400.10 Section 2400.10 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION REGULATIONS IMPLEMENTING THE PRIVACY ACT § 2400.10 Schedule of fees. (a) Policy. The purpose of this section is to establish fair and...

  1. TDRS-L Spacecraft Fairing Encapsulation

    NASA Image and Video Library

    2014-01-08

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, United Launch Alliance engineers and technicians encapsulate the Tracking and Data Relay Satellite, or TDRS-L, spacecraft in its payload fairing. TDRS-L will then be transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  2. TDRS-L Spacecraft Fairing Encapsulation

    NASA Image and Video Library

    2014-01-08

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing prior to being transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  3. TDRS-L Spacecraft Fairing Encapsulation

    NASA Image and Video Library

    2014-01-08

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, the Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing in preparation for begin transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  4. TDRS-L Spacecraft Fairing Encapsulation

    NASA Image and Video Library

    2014-01-08

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft has been encapsulated in its payload fairing. TDRS-L will then be transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  5. TDRS-L Spacecraft Fairing Encapsulation

    NASA Image and Video Library

    2014-01-08

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, United Launch Alliance engineers and technicians ensure precision as the Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing in preparation for begin transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  6. TDRS-L Spacecraft Fairing Encapsulation

    NASA Image and Video Library

    2014-01-08

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, the Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing in preparation for being transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  7. TDRS-L Spacecraft Fairing Encapsulation

    NASA Image and Video Library

    2014-01-08

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being encapsulated in its payload fairing in preparation for begin transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  8. 75 FR 11557 - Woven Electric Blankets From China

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... From China AGENCY: United States International Trade Commission. ACTION: Scheduling of the final phase... States is materially retarded, by reason of less-than-fair-value imports from China of woven electric... blankets from the People's Republic of China are being sold in the United States at less than fair value...

  9. Uplink Packet-Data Scheduling in DS-CDMA Systems

    NASA Astrophysics Data System (ADS)

    Choi, Young Woo; Kim, Seong-Lyun

    In this letter, we consider the uplink packet scheduling for non-real-time data users in a DS-CDMA system. As an effort to jointly optimize throughput and fairness, we formulate a time-span minimization problem incorporating the time-multiplexing of different simultaneous transmission schemes. Based on simple rules, we propose efficient scheduling algorithms and compare them with the optimal solution obtained by linear programming.

  10. 19 CFR 207.21 - Final phase notice of scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Final phase notice of scheduling. 207.21 Section 207.21 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  11. KSC-2014-3015

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the payload fairing for NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The fairing will soon be used to encapsulate the satellite atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  12. KSC-2014-3017

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the payload fairing for NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The fairing will soon be used to encapsulate the satellite atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  13. KSC-2014-2999

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – Half of the Delta II payload fairing for NASA's Orbiting Carbon Observatory-2, or OCO-2, is secured around the spacecraft in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  14. KSC-2014-3016

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the payload fairing for NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The fairing will soon be used to encapsulate the satellite atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  15. KSC-2014-2996

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – NASA's Orbiting Carbon Observatory-2, or OCO-2, is in position in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California, ready for encapsulation into the Delta II payload fairing. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  16. KSC-2014-3003

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – The half-sections of the Delta II payload fairing roll into position to surround NASA's Orbiting Carbon Observatory-2, or OCO-2, in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  17. KSC-2014-3001

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – Preparations are underway to complete the encapsulation of NASA's Orbiting Carbon Observatory-2, or OCO-2, into the Delta II payload fairing in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  18. KSC-2014-2997

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – Technicians monitor a half-section of the Delta II payload fairing as it is moved toward NASA's Orbiting Carbon Observatory-2, or OCO-2, in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  19. KSC-2014-3000

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – NASA's Orbiting Carbon Observatory-2, or OCO-2, is viewed for the last time in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California before the Delta II payload fairing encloses it completely for launch. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  20. KSC-2014-3002

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – The remaining half-section of the Delta II payload fairing moves into place around NASA's Orbiting Carbon Observatory-2, or OCO-2, in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  1. KSC-2014-3004

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – Encapsulation of NASA's Orbiting Carbon Observatory-2, or OCO-2, into the Delta II payload fairing nears completion in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  2. KSC-2014-2998

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – Half of the Delta II payload fairing for NASA's Orbiting Carbon Observatory-2, or OCO-2, is positioned around the spacecraft in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  3. KSC-2014-3024

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the payload fairing for NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The fairing will soon be used to encapsulate the satellite atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  4. KSC-2014-2995

    NASA Image and Video Library

    2014-06-21

    VANDENBERG AIR FORCE BASE, Calif. – Preparations are underway to encapsulate NASA's Orbiting Carbon Observatory-2, or OCO-2, into the Delta II payload fairing in the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect OCO-2 during launch aboard a United Launch Alliance Delta II rocket, scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  5. KSC-99pp0716

    NASA Image and Video Library

    1999-06-19

    A camera is shown mounted on the second stage of the Boeing Delta II rocket scheduled to launch NASA's Far Ultraviolet Spectroscopic Explorer (FUSE) satellite June 24 from Launch Pad 17A, Cape Canaveral Air Station. The camera will record the separation of the fairing encircling the satellite, which should occur several minutes after launch. FUSE is designed to scour the cosmos for the fossil record of the origins of the universe hydrogen and deuterium. Scientists will use FUSE to study hydrogen and deuterium to unlock the secrets of how the primordial chemical elements of which all stars, planets and life evolved, were created and distributed since the birth of the universe

  6. KSC-2009-1794

    NASA Image and Video Library

    2009-02-21

    VANDENBERG AIR FORCE BASE, Calif. -- On Launch Complex 576-E at Vandenberg Air Force Base in California, workers in the bucket trucks are securing the fairing ducting, GN2 purge line, and cable harnesses to the umbilical mast attached to Orbital Sciences' Taurus XL rocket. Atop the rocket is NASA's Orbiting Carbon Observatory, or OCO, which is scheduled to launch Feb. 24 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. Photo credit: NASA/Richard Nielsen, VAFB

  7. KSC-2009-1712

    NASA Image and Video Library

    2009-02-18

    VANDENBERG AIR FORCE BASE, Calif. -- On Launch Complex 576-E at Vandenberg Air Force Base in California, Orbital Sciences Engineer Jose Castillo (right) maneuvers the bucket truck into position over the fairing access door on NASA's Orbiting Carbon Observatory, or OCO. Technician Mark Neuse feels for the payload access door through the environmental cover. OCO is scheduled for launch the Taurus rocket Feb. 24 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. Photo credit: NASA/Richard Nielsen, VAFB

  8. 49 CFR 31.19 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., the ALJ shall schedule at least one prehearing conference at a reasonable time in advance of the...) Scheduling dates for the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition...

  9. 34 CFR 33.19 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., the ALJ shall schedule at least one perhearing conference at a reasonable time in advance of the...) Scheduling dates for the exchange of witness lists and of proposed exhibits. (8) Discovery. (9) The time and place for the hearing. (10) Such other matters as may tend to expedite the fair and just disposition of...

  10. 12 CFR 308.518 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... will schedule at least one prehearing conference at a reasonable time in advance of the hearing. (c...) Scheduling dates for the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time, date, and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just...

  11. 10 CFR 1013.19 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., the ALJ shall schedule at least one prehearing conference at a reasonable time in advance of the...) Scheduling dates for the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time, date, and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just...

  12. 12 CFR 308.518 - Prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... will schedule at least one prehearing conference at a reasonable time in advance of the hearing. (c...) Scheduling dates for the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time, date, and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just...

  13. 41 CFR 105-70.019 - Prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., the ALJ shall schedule at least one prehearing conference at a reasonable time in advance of the...) Scheduling dates for the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition...

  14. 34 CFR 33.19 - Prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., the ALJ shall schedule at least one perhearing conference at a reasonable time in advance of the...) Scheduling dates for the exchange of witness lists and of proposed exhibits. (8) Discovery. (9) The time and place for the hearing. (10) Such other matters as may tend to expedite the fair and just disposition of...

  15. 10 CFR 1013.19 - Prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., the ALJ shall schedule at least one prehearing conference at a reasonable time in advance of the...) Scheduling dates for the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time, date, and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just...

  16. 77 FR 3281 - High Pressure Steel Cylinders From China; Scheduling of the Final Phase of Countervailing Duty...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ...)] High Pressure Steel Cylinders From China; Scheduling of the Final Phase of Countervailing Duty and... retarded, by reason of subsidized and less-than-fair-value imports from China of high pressure steel... (``high pressure steel cylinders''). High pressure steel cylinders are fabricated of chrome alloy steel...

  17. 77 FR 50713 - Steel Wire Garment Hangers From Taiwan and Vietnam; (Corrected Notice) Scheduling of the Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ...)] Steel Wire Garment Hangers From Taiwan and Vietnam; (Corrected Notice) Scheduling of the Final Phase of... the United States is materially retarded, by reason of subsidized imports from Vietnam of steel wire garment hangers and less- than-fair-value imports from Taiwan and Vietnam of steel wire garment hangers...

  18. 77 FR 50160 - Steel Wire Garment Hangers From Taiwan and Vietnam; Scheduling of the Final Phase of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ...)] Steel Wire Garment Hangers From Taiwan and Vietnam; Scheduling of the Final Phase of Countervailing Duty... States is materially retarded, by reason of subsidized imports from Taiwan of steel wire garment hangers and less- than-fair-value imports from Taiwan and Vietnam of steel wire garment hangers, provided for...

  19. 75 FR 81110 - Schedule of Fees for Access to NOAA Environmental Data, Information, and Related Products and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... Related Products and Services AGENCY: National Environmental Satellite, Data and Information Service..., information, and related products and services to users. NESDIS is revising the fee schedule to ensure that... related products and services. NESDIS is authorized under 15 U.S.C. 1534 to assess fees, up to fair market...

  20. 76 FR 33782 - Multilayered Wood Flooring From China; Scheduling of the Final Phase of Countervailing Duty and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... Wood Flooring From China; Scheduling of the Final Phase of Countervailing Duty and Antidumping... retarded, by reason of subsidized and less-than-fair-value imports from China of multilayered wood flooring... as `` * * * multilayered wood flooring, composed of an assembly of two or more layers or plies of...

  1. Social information affects adults' evaluation of fairness in distributions: An ERP approach.

    PubMed

    Ishikawa, Mitsuhiko; Park, Yun-Hee; Kitazaki, Michiteru; Itakura, Shoji

    2017-01-01

    The sense of fairness has been observed in early infancy. Because many studies of fairness in adults have used economic games such as the Ultimatum Game, it has been difficult to compare fairness between adults and infants. Further, recent studies have suggested that social information about actors who behave fairly or unfairly may influence the judgement of fairness in infants. Therefore, to compare the sense of fairness between infants and adults, the study using paradigm in infant research is required. We examined how social information about two characters, either prosocial or antisocial, affects the event-related potential response (ERP) to fair or unfair resource distributions in adults. In the habituation phase, participants were informed about characters' social information through their actions. One character then distributed resources fairly or unfairly, and ERP was measured at the end of the distribution. Data from eighteen adult participants were analysed. A significant interaction of social information and fairness was found for late positive potential (LPP), but a post-hoc t test revealed a significant difference between fair and unfair conditions only for actions of the antisocial character. We found that LPP can reflect the sense of fairness affected by social information. Comparison with infant studies suggests that the sense of fairness may change during development.

  2. Solving cyclical nurse scheduling problem using preemptive goal programming

    NASA Astrophysics Data System (ADS)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  3. An Efficient Randomized Algorithm for Real-Time Process Scheduling in PicOS Operating System

    NASA Astrophysics Data System (ADS)

    Helmy*, Tarek; Fatai, Anifowose; Sallam, El-Sayed

    PicOS is an event-driven operating environment designed for use with embedded networked sensors. More specifically, it is designed to support the concurrency in intensive operations required by networked sensors with minimal hardware requirements. Existing process scheduling algorithms of PicOS; a commercial tiny, low-footprint, real-time operating system; have their associated drawbacks. An efficient, alternative algorithm, based on a randomized selection policy, has been proposed, demonstrated, confirmed for efficiency and fairness, on the average, and has been recommended for implementation in PicOS. Simulations were carried out and performance measures such as Average Waiting Time (AWT) and Average Turn-around Time (ATT) were used to assess the efficiency of the proposed randomized version over the existing ones. The results prove that Randomized algorithm is the best and most attractive for implementation in PicOS, since it is most fair and has the least AWT and ATT on average over the other non-preemptive scheduling algorithms implemented in this paper.

  4. A microeconomic scheduler for parallel computers

    NASA Technical Reports Server (NTRS)

    Stoica, Ion; Abdel-Wahab, Hussein; Pothen, Alex

    1995-01-01

    We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

  5. 7 CFR 1421.403 - DMA approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... accompanying notes, schedules, or exhibits, certified by a certified public accountant as fairly representing the entity's financial condition. (3) The entity's tax identification number. (4) A copy of any...

  6. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, a crane is in place to lift the fairing for the Mars Exploration Rover 2 (MER-2/MER-A). The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, a crane is in place to lift the fairing for the Mars Exploration Rover 2 (MER-2/MER-A). The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  7. KSC-87PC-0266

    NASA Image and Video Library

    1987-03-16

    CAPE CANAVERAL, Fla. -- At Cape Canaveral Air Force Station in Florida, the paylaod fairing of the Delta 182 launch vehicle is carefully moved into place as encapsulation procedures continue on the Palapa B2-P communications satellite at Launch Complex 17, Pad B. Palapa is scheduled for launch from Cape Canaveral for the government of Indonesia. Liftoff of Delta 182 and Palapa is scheduled for March 20. Photo Credit: NASA

  8. Fairness in optimizing bus-crew scheduling process.

    PubMed

    Ma, Jihui; Song, Cuiying; Ceder, Avishai Avi; Liu, Tao; Guan, Wei

    2017-01-01

    This work proposes a model considering fairness in the problem of crew scheduling for bus drivers (CSP-BD) using a hybrid ant-colony optimization (HACO) algorithm to solve it. The main contributions of this work are the following: (a) a valid approach for cases with a special cost structure and constraints considering the fairness of working time and idle time; (b) an improved algorithm incorporating Gamma heuristic function and selecting rules. The relationships of each cost are examined with ten bus lines collected from the Beijing Public Transport Holdings (Group) Co., Ltd., one of the largest bus transit companies in the world. It shows that unfair cost is indirectly related to common cost, fixed cost and extra cost and also the unfair cost approaches to common and fixed cost when its coefficient is twice of common cost coefficient. Furthermore, the longest time for the tested bus line with 1108 pieces, 74 blocks is less than 30 minutes. The results indicate that the HACO-based algorithm can be a feasible and efficient optimization technique for CSP-BD, especially with large scale problems.

  9. Job shop scheduling problem with late work criterion

    NASA Astrophysics Data System (ADS)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  10. “I pick you”: the impact of fairness and race on infants’ selection of social partners

    PubMed Central

    Burns, Monica P.; Sommerville, Jessica A.

    2014-01-01

    By 15 months of age infants are sensitive to violations of fairness norms as assessed via their enhanced visual attention to unfair versus fair outcomes in violation-of-expectation paradigms. The current study investigated whether 15-month-old infants select social partners on the basis of prior fair versus unfair behavior, and whether infants integrate social selections on the basis of fairness with the race of the distributors and recipients involved in the exchange. Experiment 1 demonstrated that after witnessing one adult distribute toys to two recipients fairly (2:2 distribution), and another adult distribute toys to two recipients unfairly (1:3 distribution), Caucasian infants selected fair over unfair distributors when both distributors were Caucasian; however, this preference was not present when the fair actor was Asian and the unfair actor was Caucasian. In Experiment 2, when fairness, the race of the distributor, and the race of the recipients were fully crossed, Caucasian infants’ social selections varied as a function of the race of the recipient advantaged by the unfair distributor. Specifically, infants were more likely to select the fair distributor when the unfair recipient advantaged the Asian (versus the Caucasian) recipient. These findings provide evidence that infants select social partners on the basis of prior fair behavior and that infants also take into account the race of distributors and recipients when making their social selections. PMID:24575069

  11. Reputation, Princing and the E-Science Grid

    NASA Astrophysics Data System (ADS)

    Anandasivam, Arun; Neumann, Dirk

    One of the fundamental aspects for an efficient Grid usage is the optimization of resource allocation among the participants. However, this has not yet materialized. Each user is a self-interested participant trying to maximize his utility whereas the utility is not only determined by the fastest completion time, but on the prices as well. Future revenues are influenced by users' reputation. Reputation mechanisms help to build trust between loosely coupled and geographically distributed participants. Providers need an incentive to reduce selfish cancellation of jobs and privilege own jobs. In this chapter we present first an offline scheduling mechanism with a fixed price. Jobs are collected by a broker and scheduled to machines. The goal of the broker is to balance the load and to maximize the revenue in the network. Consumers can submit their jobs according to their preferences, but taking the incentives of the broker into account. This mechanism does not consider reputation. In a second step a reputation-based pricing mechanism for a simple, but fair pricing of resources is analyzed. In e-Science researchers do not appreciate idiosyncratic pricing strategies and policies. Their interest lies in doing research in an efficient manner. Consequently, in our mechanism the price is tightly coupled to the reputation of a site to guarantee fairness of pricing and facilitate price determination. Furthermore, the price is not the only parameter as completion time plays an important role, when deadlines have to be met. We provide a flexible utility and decision model for every participant and analyze the outcome of our reputation-based pricing system via simulation.

  12. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  13. A FairShare Scheduling Service for OpenNebula

    NASA Astrophysics Data System (ADS)

    Bagnasco, S.; Vallero, S.; Zaccolo, V.

    2017-10-01

    In the ideal limit of infinite resources, multi-tenant applications are able to scale in/out on a Cloud driven only by their functional requirements. While a large Public Cloud may be a reasonable approximation of this condition, small scientific computing centres usually work in a saturated regime. In this case, an advanced resource allocation policy is needed in order to optimize the use of the data centre. The general topic of advanced resource scheduling is addressed by several components of the EU-funded INDIGO-DataCloud project. In this contribution, we describe the FairShare Scheduler Service (FaSS) for OpenNebula (ONE). The service must satisfy resource requests according to an algorithm which prioritizes tasks according to an initial weight and to the historical resource usage of the project. The software was designed to be less intrusive as possible in the ONE code. We keep the original ONE scheduler implementation to match requests to available resources, but the queue of pending jobs to be processed is the one ordered according to priorities as delivered by the FaSS. The FaSS implementation is still being finalized and in this contribution we describe the functional and design requirements the module should satisfy, as well as its high-level architecture.

  14. Integrated Traffic Flow Management Decision Making

    NASA Technical Reports Server (NTRS)

    Grabbe, Shon R.; Sridhar, Banavar; Mukherjee, Avijit

    2009-01-01

    A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

  15. KSC-2011-1161

    NASA Image and Video Library

    2011-01-15

    VANDENBERG AIR FORCE BASE, Calif. -- Technicians prepare the payload fairing to be used in the Glory mission before the fairing is moved to East High Bay at the Astrotech payload processing facility at Vandenberg Air Force Base in California. The payload fairing will protect the Glory spacecraft from aerodynamic pressures and heating during the first part of its climb into orbit. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  16. Research on a Queue Scheduling Algorithm in Wireless Communications Network

    NASA Astrophysics Data System (ADS)

    Yang, Wenchuan; Hu, Yuanmei; Zhou, Qiancai

    This paper proposes a protocol QS-CT, Queue Scheduling Mechanism based on Multiple Access in Ad hoc net work, which adds queue scheduling mechanism to RTS-CTS-DATA using multiple access protocol. By endowing different queues different scheduling mechanisms, it makes networks access to the channel much more fairly and effectively, and greatly enhances the performance. In order to observe the final performance of the network with QS-CT protocol, we simulate it and compare it with MACA/C-T without QS-CT protocol. Contrast to MACA/C-T, the simulation result shows that QS-CT has greatly improved the throughput, delay, rate of packets' loss and other key indicators.

  17. A note on resource allocation scheduling with group technology and learning effects on a single machine

    NASA Astrophysics Data System (ADS)

    Lu, Yuan-Yuan; Wang, Ji-Bo; Ji, Ping; He, Hongyu

    2017-09-01

    In this article, single-machine group scheduling with learning effects and convex resource allocation is studied. The goal is to find the optimal job schedule, the optimal group schedule, and resource allocations of jobs and groups. For the problem of minimizing the makespan subject to limited resource availability, it is proved that the problem can be solved in polynomial time under the condition that the setup times of groups are independent. For the general setup times of groups, a heuristic algorithm and a branch-and-bound algorithm are proposed, respectively. Computational experiments show that the performance of the heuristic algorithm is fairly accurate in obtaining near-optimal solutions.

  18. How to do research fairly in an unjust world.

    PubMed

    Ballantyne, Angela J

    2010-06-01

    International research, sponsored by for-profit companies, is regularly criticised as unethical on the grounds that it exploits research subjects in developing countries. Many commentators agree that exploitation occurs when the benefits of cooperative activity are unfairly distributed between the parties. To determine whether international research is exploitative we therefore need an account of fair distribution. Procedural accounts of fair bargaining have been popular solutions to this problem, but I argue that they are insufficient to protect against exploitation. I argue instead that a maximin principle of fair distribution provides a more compelling normative account of fairness in relationships characterised by extreme vulnerability and inequality of bargaining potential between the parties. A global tax on international research would provide a mechanism for implementing the maximin account of fair benefits. This model has the capacity to ensure fair benefits and thereby prevent exploitation in international research.

  19. InSight Atlas V Fairing Arrival, Offload, and Unbagging

    NASA Image and Video Library

    2018-01-31

    The United Launch Alliance (ULA) payload fairing for NASA's upcoming Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, or InSight, mission to land on Mars arrives at Vandenberg Air Force Base in California. InSight is the first mission to explore the Red Planet's deep interior. It will investigate processes that shaped the rocky planets of the inner solar system including Earth. Liftoff atop a ULA Atlas V rocket is scheduled for May 5, 2018.

  20. KENNEDY SPACE CENTER, FLA. - After arriving at Launch Complex 17-A, Cape Canaveral Air Force Station, the second half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is lifted off its transporter. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - After arriving at Launch Complex 17-A, Cape Canaveral Air Force Station, the second half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is lifted off its transporter. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  1. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is lifted up the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is lifted up the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  2. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) reaches the top of the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) reaches the top of the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  3. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is lifted off the transporter. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is lifted off the transporter. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  4. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is moved inside the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5..

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is moved inside the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5..

  5. Infants Associate Praise and Admonishment with Fair and Unfair Individuals

    PubMed Central

    DesChamps, Trent D.; Eason, Arianne E.; Sommerville, Jessica A.

    2016-01-01

    Recent evidence suggests that infants possess a rudimentary sensitivity to fairness: infants expect resources to be distributed fairly and equally, and prefer individuals that distribute resources fairly over those that do so unfairly. The goal of the present work was to determine whether infants' evaluations of fair and unfair individuals also includes an understanding that fair individuals are worthy of praise and unfair individuals are worthy of admonishment. After watching individuals distribute goods fairly or unfairly to recipients, 15-month-old (Experiments 1 and 2) and 13-month-old (Experiment 3) infants took part in a test phase in which they saw only the distributors' faces accompanied by praise or admonishment. Across all experiments, infants differentially shifted their visual attention to images of the fair and unfair distributors as a function of the accompanying praise or admonishment, although the direction in which they did so varied by age. Thus, by the start of the second year of life, infants appear to perceive fair individuals as morally praiseworthy and unfair individuals as morally blameworthy. PMID:27570495

  6. Medium of exchange matters: what's fair for goods is unfair for money.

    PubMed

    DeVoe, Sanford E; Iyengar, Sheena S

    2010-02-01

    Organized groups face a fundamental problem of how to distribute resources fairly. We found people view it as less fair to distribute resources equally when the allocated resource invokes the market by being a medium of exchange than when the allocated resource is a good that holds value in use. These differences in fairness can be attributed to being a medium of exchange, and not to other essential properties of money (i.e., being a unit of account or a store of value). These findings suggest that egalitarian outcomes have a greater likelihood of being accepted as fair when the resources being distributed take the form of in-kind goods rather than of cash transfers.

  7. Data-oriented scheduling for PROOF

    NASA Astrophysics Data System (ADS)

    Xu, Neng; Guan, Wen; Wu, Sau Lan; Ganis, Gerardo

    2011-12-01

    The Parallel ROOT Facility - PROOF - is a distributed analysis system optimized for I/O intensive analysis tasks of HEP data. With LHC entering the analysis phase, PROOF has become a natural ingredient for computing farms at Tier3 level. These analysis facilities will typically be used by a few tenths of users, and can also be federated into a sort of analysis cloud corresponding to the Virtual Organization of the experiment. Proper scheduling is required to guarantee fair resource usage, to enforce priority policies and to optimize the throughput. In this paper we discuss an advanced priority system that we are developing for PROOF. The system has been designed to automatically adapt to unknown length of the tasks, to take into account the data location and availability (including distribution across geographically separated sites), and the {group, user} default priorities. In this system, every element - user, group, dataset, job slot and storage - gets its priority and those priorities are dynamically linked with each other. In order to tune the interplay between the various components, we have designed and started implementing a simulation application that can model various type and size of PROOF clusters. In this application a monitoring package records all the changes of them so that we can easily understand and tune the performance. We will discuss the status of our simulation and show examples of the results we are expecting from it.

  8. Insight Fairing Offload and Unbagging

    NASA Image and Video Library

    2018-01-30

    In the Astrotech facility at Vandenberg Air Force Base in California, technicians remove protective wrapping from the United Launch Alliance (ULA) payload fairing for NASA's upcoming Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, or InSight, spacecraft designed to land on Mars. InSight is the first mission to explore the Red Planet's deep interior. It will investigate processes that shaped the rocky planets of the inner solar system including Earth. Liftoff atop a ULA Atlas V rocket is scheduled for May 5, 2018.

  9. InSight Atlas V Fairing Arrival, Offload, and Unbagging

    NASA Image and Video Library

    2018-01-31

    The United Launch Alliance (ULA) payload fairing for NASA's upcoming Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, or InSight, mission to land on Mars has just arrived at the Astrotech facility at Vandenberg Air Force Base in California. InSight is the first mission to explore the Red Planet's deep interior. It will investigate processes that shaped the rocky planets of the inner solar system including Earth. Liftoff atop a ULA Atlas V rocket is scheduled for May 5, 2018.

  10. InSight Atlas V Fairing Arrival, Offload, and Unbagging

    NASA Image and Video Library

    2018-01-31

    In the Astrotech facility at Vandenberg Air Force Base in California, technicians remove protective wrapping from the United Launch Alliance (ULA) payload fairing for NASA's upcoming Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, or InSight, spacecraft designed to land on Mars. InSight is the first mission to explore the Red Planet's deep interior. It will investigate processes that shaped the rocky planets of the inner solar system including Earth. Liftoff atop a ULA Atlas V rocket is scheduled for May 5, 2018.

  11. KSC-2011-1160

    NASA Image and Video Library

    2011-01-15

    VANDENBERG AIR FORCE BASE, Calif. -- A technician works with half of the payload fairing to be used in the Glory mission before the fairing is moved to the East High Bay at the Astrotech payload processing facility at Vandenberg Air Force Base in California. The payload fairing will protect the Glory spacecraft from aerodynamic pressures and heating during the first part of its climb into orbit. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  12. Enhanced round robin CPU scheduling with burst time based time quantum

    NASA Astrophysics Data System (ADS)

    Indusree, J. R.; Prabadevi, B.

    2017-11-01

    Process scheduling is a very important functionality of Operating system. The main-known process-scheduling algorithms are First Come First Serve (FCFS) algorithm, Round Robin (RR) algorithm, Priority scheduling algorithm and Shortest Job First (SJF) algorithm. Compared to its peers, Round Robin (RR) algorithm has the advantage that it gives fair share of CPU to the processes which are already in the ready-queue. The effectiveness of the RR algorithm greatly depends on chosen time quantum value. Through this research paper, we are proposing an enhanced algorithm called Enhanced Round Robin with Burst-time based Time Quantum (ERRBTQ) process scheduling algorithm which calculates time quantum as per the burst-time of processes already in ready queue. The experimental results and analysis of ERRBTQ algorithm clearly indicates the improved performance when compared with conventional RR and its variants.

  13. Interrelationship between Autism Diagnostic Observation Schedule-Generic (ADOS-G), Autism Diagnostic Interview-Revised (ADI-R), and the Diagnostic and Statistical Manual of Mental Disorders (DSM-IV-TR) Classification in Children and Adolescents with Mental Retardation

    ERIC Educational Resources Information Center

    de Bildt, Annelies; Sytema, Sjoerd; Ketelaars, Cees; Kraijer, Dirk; Mulder, Erik; Volkmar, Fred; Minderaa, Ruud

    2004-01-01

    The interrelationship between the Autism Diagnostic Interview-Revised (ADI-R), Autism Diagnostic Observation Schedule-Generic (ADOS-G) and clinical classification was studied in 184 children and adolescents with Mental Retardation (MR). The agreement between the ADI-R and ADOS-G was fair, with a substantial difference between younger and older…

  14. Analysis of sequencing and scheduling methods for arrival traffic

    NASA Technical Reports Server (NTRS)

    Neuman, Frank; Erzberger, Heinz

    1990-01-01

    The air traffic control subsystem that performs scheduling is discussed. The function of the scheduling algorithms is to plan automatically the most efficient landing order and to assign optimally spaced landing times to all arrivals. Several important scheduling algorithms are described and the statistical performance of the scheduling algorithms is examined. Scheduling brings order to an arrival sequence for aircraft. First-come-first-served scheduling (FCFS) establishes a fair order, based on estimated times of arrival, and determines proper separations. Because of the randomness of the traffic, gaps will remain in the scheduled sequence of aircraft. These gaps are filled, or partially filled, by time-advancing the leading aircraft after a gap while still preserving the FCFS order. Tightly scheduled groups of aircraft remain with a mix of heavy and large aircraft. Separation requirements differ for different types of aircraft trailing each other. Advantage is taken of this fact through mild reordering of the traffic, thus shortening the groups and reducing average delays. Actual delays for different samples with the same statistical parameters vary widely, especially for heavy traffic.

  15. AI techniques for a space application scheduling problem

    NASA Technical Reports Server (NTRS)

    Thalman, N.; Sparn, T.; Jaffres, L.; Gablehouse, D.; Judd, D.; Russell, C.

    1991-01-01

    Scheduling is a very complex optimization problem which can be categorized as an NP-complete problem. NP-complete problems are quite diverse, as are the algorithms used in searching for an optimal solution. In most cases, the best solutions that can be derived for these combinatorial explosive problems are near-optimal solutions. Due to the complexity of the scheduling problem, artificial intelligence (AI) can aid in solving these types of problems. Some of the factors are examined which make space application scheduling problems difficult and presents a fairly new AI-based technique called tabu search as applied to a real scheduling application. the specific problem is concerned with scheduling application. The specific problem is concerned with scheduling solar and stellar observations for the SOLar-STellar Irradiance Comparison Experiment (SOLSTICE) instrument in a constrained environment which produces minimum impact on the other instruments and maximizes target observation times. The SOLSTICE instrument will gly on-board the Upper Atmosphere Research Satellite (UARS) in 1991, and a similar instrument will fly on the earth observing system (Eos).

  16. Comparison of OPC job prioritization schemes to generate data for mask manufacturing

    NASA Astrophysics Data System (ADS)

    Lewis, Travis; Veeraraghavan, Vijay; Jantzen, Kenneth; Kim, Stephen; Park, Minyoung; Russell, Gordon; Simmons, Mark

    2015-03-01

    Delivering mask ready OPC corrected data to the mask shop on-time is critical for a foundry to meet the cycle time commitment for a new product. With current OPC compute resource sharing technology, different job scheduling algorithms are possible, such as, priority based resource allocation and fair share resource allocation. In order to maximize computer cluster efficiency, minimize the cost of the data processing and deliver data on schedule, the trade-offs of each scheduling algorithm need to be understood. Using actual production jobs, each of the scheduling algorithms will be tested in a production tape-out environment. Each scheduling algorithm will be judged on its ability to deliver data on schedule and the trade-offs associated with each method will be analyzed. It is now possible to introduce advance scheduling algorithms to the OPC data processing environment to meet the goals of on-time delivery of mask ready OPC data while maximizing efficiency and reducing cost.

  17. Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis

    NASA Astrophysics Data System (ADS)

    Chou, Hui-Yu; Yang, Jyh-Bin

    2017-10-01

    The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.

  18. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is raised to a vertical position for its lift up the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the first half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is raised to a vertical position for its lift up the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  19. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the second half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is raised to a vertical position for its lift up the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the second half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is raised to a vertical position for its lift up the launch tower. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  20. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the second half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) nears the top of the launch tower. The fairing will be installed around the payload for protection during launch on a Delta II rocket. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the second half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) nears the top of the launch tower. The fairing will be installed around the payload for protection during launch on a Delta II rocket. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  1. The Influence of Procedural and Distributive Justice on Organizational Behavior.

    ERIC Educational Resources Information Center

    Alexander, Sheldon; Ruderman, Marion

    Research on justice in organizational behavior has emphasized distributive rather than procedural justice. Distributive justice focuses on the fairness of rewards, while procedural justice focuses on the fairness of the procedures used in allocating rewards. To examine the procedural-distributive justice distinction as it relates to organizatonal…

  2. Scheduling "Go with the Flow."

    ERIC Educational Resources Information Center

    Yucht, Alice

    1999-01-01

    Presents guidelines for creating a Master Planner for the school year. Highlights several factors to consider, including annual classroom projects; standardized testing dates; report card dates; special assembly programs and local/national/world events; book fairs; and end of the year activities. (AEF)

  3. A primary shift rotation nurse scheduling using zero-one linear goal programming.

    PubMed

    Huarng, F

    1999-01-01

    In this study, the author discusses the effect of nurse shift schedules on circadian rhythm and some important ergonomics criteria. The author also reviews and compares different nurse shift scheduling methods via the criteria of flexibility, fairness, continuity in shift assignments, nurses' preferences, and ergonomics principles. In this article, a primary shift rotation system is proposed to provide better continuity in shift assignments to satisfy nurses' preferences. The primary shift rotation system is modeled as a zero-one linear goal programming (LGP) problem. To generate the shift assignment for a unit with 13 nurses, the zero-one LGP model takes less than 3 minutes on average, whereas the head nurses spend approximately 2 to 3 hours on shift scheduling. This study reports the process of implementing the primary shift rotation system.

  4. InSight Atlas V Fairing Rotate to Vertical

    NASA Image and Video Library

    2018-02-07

    In the Astrotech facility at Vandenberg Air Force Base in California, the payload fairing for the United Launch Alliance (ULA) Atlas V for NASA's upcoming Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, or InSight, mission to land on Mars is lifted to the vertical position. InSight is the first mission to explore the Red Planet's deep interior. It will investigate processes that shaped the rocky planets of the inner solar system including Earth. Liftoff atop a ULA Atlas V rocket is scheduled for May 5, 2018.

  5. Mission and science activity scheduling language

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1993-01-01

    To support the distributed and complex operational scheduling required for future National Aeronautics and Space Administration (NASA) missions, a formal, textual language, the Scheduling Applications Interface Language (SAIL), has been developed. Increased geographic dispersion of investigators is leading to distributed mission and science activity planning, scheduling, and operations. SAIL is an innovation which supports the effective and efficient communication of scheduling information among physically dispersed applications in distributed scheduling environments. SAIL offers a clear, concise, unambiguous expression of scheduling information in a readable, hardware independent format. The language concept, syntax, and semantics incorporate language features found useful during five years of research and prototyping with scheduling languages in physically distributed environments. SAIL allows concise specification of mission and science activity plans in a format which promotes repetition and reuse.

  6. Fairness and a Sustainable Society: Why Do We Care for the Education of Future Generations?

    ERIC Educational Resources Information Center

    Miyadera, Akio

    2010-01-01

    Regarding education as "the social" rather than an intentional action between individuals, this paper discusses the fair way of its distribution. Fairness is presumed to be relevant to the distribution of resources for education not only among people belonging to the same generation in the same society, but also among people belonging to…

  7. 75 FR 80527 - Aluminum Extrusions From China

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ...)] Aluminum Extrusions From China AGENCY: United States International Trade Commission. ACTION: Scheduling of... of subsidized and less-than-fair-value imports from China of aluminum extrusions, primarily provided... contained in Aluminum Extrusions From the People's Republic of China: Notice of Preliminary Determination of...

  8. Wave scheduling - Decentralized scheduling of task forces in multicomputers

    NASA Technical Reports Server (NTRS)

    Van Tilborg, A. M.; Wittie, L. D.

    1984-01-01

    Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

  9. KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the second half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is lifted up the outside of the launch tower. Visible on another side is the Delta II rocket that will carry the payload into space. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At Launch Complex 17-A, Cape Canaveral Air Force Station, the second half of the fairing for the Mars Exploration Rover 2 (MER-2/MER-A) is lifted up the outside of the launch tower. Visible on another side is the Delta II rocket that will carry the payload into space. The fairing will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  10. KSC-2014-2953

    NASA Image and Video Library

    2014-06-14

    VANDENBERG AIR FORCE BASE, Calif. – NASA's Orbiting Carbon Observatory-2, or OCO-2, is transferred into the clean room at the top of the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California. There it will be encapsulated into the Delta II payload fairing and mated with the United Launch Alliance Delta II rocket inside the tower. Launch is scheduled for July 1. OCO-2 will collect precise global measurements of carbon dioxide in the Earth's atmosphere and provide scientists with a better idea of the chemical compound's impacts on climate change. Scientists will analyze this data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important atmospheric gas. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  11. Job Management Requirements for NAS Parallel Systems and Clusters

    NASA Technical Reports Server (NTRS)

    Saphir, William; Tanner, Leigh Ann; Traversat, Bernard

    1995-01-01

    A job management system is a critical component of a production supercomputing environment, permitting oversubscribed resources to be shared fairly and efficiently. Job management systems that were originally designed for traditional vector supercomputers are not appropriate for the distributed-memory parallel supercomputers that are becoming increasingly important in the high performance computing industry. Newer job management systems offer new functionality but do not solve fundamental problems. We address some of the main issues in resource allocation and job scheduling we have encountered on two parallel computers - a 160-node IBM SP2 and a cluster of 20 high performance workstations located at the Numerical Aerodynamic Simulation facility. We describe the requirements for resource allocation and job management that are necessary to provide a production supercomputing environment on these machines, prioritizing according to difficulty and importance, and advocating a return to fundamental issues.

  12. Distributed intelligent scheduling of FMS

    NASA Astrophysics Data System (ADS)

    Wu, Zuobao; Cheng, Yaodong; Pan, Xiaohong

    1995-08-01

    In this paper, a distributed scheduling approach of a flexible manufacturing system (FMS) is presented. A new class of Petri nets called networked time Petri nets (NTPN) for system modeling of networking environment is proposed. The distributed intelligent scheduling is implemented by three schedulers which combine NTPN models with expert system techniques. The simulation results are shown.

  13. KSC-2012-1601

    NASA Image and Video Library

    2012-02-29

    VANDENBERG AIR FORCE BASE, Calif. -- NASA's Nuclear Spectroscopic Telescope Array NuSTAR spacecraft is wrapped in its protective cover and half of its payload fairing is behind it in processing facility 1555 at Vandenberg Air Force Base in California. Technicians are performing fairing closeout work in preparation for fairing installation around the spacecraft, which is scheduled to begin March 2. The cover protecting NuSTAR's delicate instruments will be removed prior to the fairing installation. The fairing will protect the spacecraft from the heat and aerodynamic pressure generated during ascent to orbit aboard an Orbital Sciences Pegasus XL rocket. After processing of the rocket and spacecraft are complete, they will be flown on Orbital's L-1011 carrier aircraft from Vandenberg to the Ronald Reagan Ballistic Missile Defense Test Site on the Pacific Ocean’s Kwajalein Atoll for launch. The high-energy X-ray telescope will conduct a census of black holes, map radioactive material in young supernovae remnants, and study the origins of cosmic rays and the extreme physics around collapsed stars. For more information, visit http://www.nasa.gov/nustar. Photo credit: NASA/Randy Beaudoin, VAFB

  14. Ethical evaluation of decision-making for distribution of health resources in China.

    PubMed

    Guo-Ping, Wang

    2007-06-01

    Since distribution of health resources involves various aspects of ethics, the evaluation of ethical problems should be emphasised in health decisions using criteria of fairness and fundamental principles of ethics correctly understood and chosen in order to solve the real conflicts evident in the distribution of health resources and to enable fair and reasonable distribution of health resources.

  15. Distributed Fair Auto Rate Medium Access Control for IEEE 802.11 Based WLANs

    NASA Astrophysics Data System (ADS)

    Zhu, Yanfeng; Niu, Zhisheng

    Much research has shown that a carefully designed auto rate medium access control can utilize the underlying physical multi-rate capability to exploit the time-variation of the channel. In this paper, we develop a simple analytical model to elucidate the rule that maximizes the throughput of RTS/CTS based multi-rate wireless local area networks. Based on the discovered rule, we propose two distributed fair auto rate medium access control schemes called FARM and FARM+ from the view-point of throughput fairness and time-share fairness, respectively. With the proposed schemes, after receiving a RTS frame, the receiver selectively returns the CTS frame to inform the transmitter the maximum feasible rate probed by the signal-to-noise ratio of the received RTS frame. The key feature of the proposed schemes is that they are capable of maintaining throughput/time-share fairness in asymmetric situation where the distribution of SNR varies with stations. Extensive simulation results show that the proposed schemes outperform the existing throughput/time-share fair auto rate schemes in time-varying channel conditions.

  16. Optimizing the resource usage in Cloud based environments: the Synergy approach

    NASA Astrophysics Data System (ADS)

    Zangrando, L.; Llorens, V.; Sgaravatto, M.; Verlato, M.

    2017-10-01

    Managing resource allocation in a cloud based data centre serving multiple virtual organizations is a challenging issue. In fact, while batch systems are able to allocate resources to different user groups according to specific shares imposed by the data centre administrator, without a static partitioning of such resources, this is not so straightforward in the most common cloud frameworks, e.g. OpenStack. In the current OpenStack implementation, it is only possible to grant fixed quotas to the different user groups and these resources cannot be exceeded by one group even if there are unused resources allocated to other groups. Moreover in the existing OpenStack implementation, when there aren’t resources available, new requests are simply rejected: it is then up to the client to later re-issue the request. The recently started EU-funded INDIGO-DataCloud project is addressing this issue through “Synergy”, a new advanced scheduling service targeted for OpenStack. Synergy adopts a fair-share model for resource provisioning which guarantees that resources are distributed among users following the fair-share policies defined by the administrator, taken also into account the past usage of such resources. We present the architecture of Synergy, the status of its implementation, some preliminary results and the foreseen evolution of the service.

  17. 29 CFR 99.500 - Scope of audit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Secretary of Labor AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditors § 99.500 Scope...) Financial statements. The auditor shall determine whether the financial statements of the auditee are... auditor shall also determine whether the schedule of expenditures of Federal awards is presented fairly in...

  18. 38 CFR 4.114 - Schedule of ratings-digestive system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... weight loss with malnutrition and anemia 60 Moderate; less frequent episodes of epigastric disorders with...: Pronounced; resulting in marked malnutrition, anemia, and general debility, or with serious complication as liver abscess 100 Severe; with numerous attacks a year and malnutrition, the health only fair during...

  19. 29 CFR 99.500 - Scope of audit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Secretary of Labor AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditors § 99.500 Scope...) Financial statements. The auditor shall determine whether the financial statements of the auditee are... auditor shall also determine whether the schedule of expenditures of Federal awards is presented fairly in...

  20. What's fair is fair--or is it? Value differences underlying public views about social justice.

    PubMed

    Rasinski, K A

    1987-07-01

    Individual differences in judgments of the fairness of various sociopolitical phenomena were examined in three surveys. Scales measuring two value dimensions thought to underlie the meaning of fairness were constructed, and survey respondents endorsing these different values were compared on their evaluation of the procedural and distributive fairness of political objects. Those endorsing the value of proportionality, hypothesized by equity theorists to underlie fairness judgments, judged equity-based public policies to be fairer than equality-based policies and judged that Ronald Reagan would be a fairer president than Walter Mondale. These people also emphasized the procedural aspects of government when judging government fairness. Respondents endorsing the value of egalitarianism, hypothesized by developmental theorists and some political philosophers to underlie fairness judgments, judged equality-based public policies to be fairer than equity-based policies and judged that Mondale would be a fairer president than Reagan. These people emphasized the distributive aspects of government when judging government fairness. Results support the naive moral philosopher image of the individual as judge of political objects (Tyler, 1984a). Political fairness judgments are ideological responses and are subject to the influence of the value structure of the judge (Tetlock, 1986).

  1. KSC-2010-4654

    NASA Image and Video Library

    2010-09-15

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett

  2. KSC-2010-4652

    NASA Image and Video Library

    2010-09-15

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett

  3. KSC-2010-4653

    NASA Image and Video Library

    2010-09-15

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett

  4. KSC-2010-4656

    NASA Image and Video Library

    2010-09-15

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett

  5. KSC-2010-4655

    NASA Image and Video Library

    2010-09-15

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett

  6. InSight Atlas V Fairing Rotate to Vertical

    NASA Image and Video Library

    2018-02-07

    In the Astrotech facility at Vandenberg Air Force Base in California, technicians and engineers inspect the payload fairing for the United Launch Alliance (ULA) Atlas V for NASA's upcoming Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, or InSight, mission to land on Mars after it was lifted to the vertical position. InSight is the first mission to explore the Red Planet's deep interior. It will investigate processes that shaped the rocky planets of the inner solar system including Earth. Liftoff atop a ULA Atlas V rocket is scheduled for May 5, 2018.

  7. KSC-04PD-1575

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. On Launch Pad 17-B at Cape Canaveral Air Force Station, Boeing workers complete the installation of the fairing around the MESSENGER (Mercury Surface, Space Environment, Geochemistry and Ranging) spacecraft. The fairing is a molded structure that fits flush with the outside surface of the upper stage booster and forms an aerodynamically smooth joint, protecting the spacecraft during launch. MESSENGER is scheduled to launch Aug. 2 aboard a Boeing Delta II rocket and is expected to enter Mercury orbit in March 2011. MESSENGER was built for NASA by the Johns Hopkins University Applied Physics Laboratory in Laurel, Md.

  8. KSC-05pd2273

    NASA Image and Video Library

    2005-09-29

    KENNEDY SPACE CENTER, FLA. - On the Shuttle Landing Facility at NASA Kennedy Space Center, the Atlas V fairing halves for the New Horizons spacecraft have been offloaded from the Russian cargo plane (background). The fairing halves will be transported to Astrotech Space Operations in Titusville. The fairing later will be placed around the New Horizons spacecraft in the Payload Hazardous Service Facility. A fairing protects a spacecraft during launch and flight through the atmosphere. Once in space, it is jettisoned. The Lockheed Martin Atlas V is the launch vehicle for the New Horizons spacecraft, which is designed to make the first reconnaissance of Pluto and Charon - a "double planet" and the last planet in our solar system to be visited by spacecraft. The mission will then visit one or more objects in the Kuiper Belt region beyond Neptune. New Horizons is scheduled to launch in January 2006, swing past Jupiter for a gravity boost and scientific studies in February or March 2007, and reach Pluto and its moon, Charon, in July 2015.

  9. KSC-05pd2274

    NASA Image and Video Library

    2005-09-29

    KENNEDY SPACE CENTER, FLA. - On the Shuttle Landing Facility at NASA Kennedy Space Center, one of the Atlas V fairing halves for the New Horizons spacecraft is offloaded from the Russian cargo plane. The fairing halves will be transported to Astrotech Space Operations in Titusville. The fairing later will be placed around the New Horizons spacecraft in the Payload Hazardous Service Facility. A fairing protects a spacecraft during launch and flight through the atmosphere. Once in space, it is jettisoned. The Lockheed Martin Atlas V is the launch vehicle for the New Horizons spacecraft, which is designed to make the first reconnaissance of Pluto and Charon - a "double planet" and the last planet in our solar system to be visited by spacecraft. The mission will then visit one or more objects in the Kuiper Belt region beyond Neptune. New Horizons is scheduled to launch in January 2006, swing past Jupiter for a gravity boost and scientific studies in February or March 2007, and reach Pluto and its moon, Charon, in July 2015.

  10. Structural Optimisation Of Payload Fairings

    NASA Astrophysics Data System (ADS)

    Santschi, Y.; Eaton, N.; Verheyden, S.; Michaud, V.

    2012-07-01

    RUAG Space are developing materials and processing technologies for manufacture of the Next Generation Launcher (NGL) payload fairing, together with the Laboratory of Polymer and Composite Technology at the EPFL, in a project running under the ESA Future Launchers Preparatory Program (FLPP). In this paper the general aims and scope of the project are described, details of the results obtained shall be presented at a later stage. RUAG Space design, develop and manufacture fairings for the European launch vehicles Ariane 5 and VEGA using well proven composite materials and production methods which provide adequate cost/performance ratio for these applications. However, the NGL shall make full use of innovations in materials and process technologies to achieve a gain in performance at a much reduced overall manufacturing cost. NGL is scheduled to become operational in 2025, with actual development beginning in 2014. In this current project the basic technology is being developed and validated, in readiness for application in the NGL. For this new application, an entirely new approach to the fairing manufacture is evaluated.

  11. KSC-05pd2271

    NASA Image and Video Library

    2005-09-29

    KENNEDY SPACE CENTER, FLA. - A Russian cargo plane sits on the Shuttle Landing Facility at NASA Kennedy Space Center with the Atlas V fairing for the New Horizons spacecraft inside. The two fairing halves will be removed, loaded onto trucks and transported to Astrotech Space Operations in Titusville. The fairing later will be placed around the New Horizons spacecraft in the Payload Hazardous Service Facility. A fairing protects a spacecraft during launch and flight through the atmosphere. Once in space, it is jettisoned. The Lockheed Martin Atlas V is the launch vehicle for the New Horizons spacecraft, which is designed to make the first reconnaissance of Pluto and Charon - a "double planet" and the last planet in our solar system to be visited by spacecraft. The mission will then visit one or more objects in the Kuiper Belt region beyond Neptune. New Horizons is scheduled to launch in January 2006, swing past Jupiter for a gravity boost and scientific studies in February or March 2007, and reach Pluto and its moon, Charon, in July 2015.

  12. System control of an autonomous planetary mobile spacecraft

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Zimmerman, Barbara A.

    1990-01-01

    The goal is to suggest the scheduling and control functions necessary for accomplishing mission objectives of a fairly autonomous interplanetary mobile spacecraft, while maximizing reliability. Goals are to provide an extensible, reliable system conservative in its use of on-board resources, while getting full value from subsystem autonomy, and avoiding the lure of ground micromanagement. A functional layout consisting of four basic elements is proposed: GROUND and SYSTEM EXECUTIVE system functions and RESOURCE CONTROL and ACTIVITY MANAGER subsystem functions. The system executive includes six subfunctions: SYSTEM MANAGER, SYSTEM FAULT PROTECTION, PLANNER, SCHEDULE ADAPTER, EVENT MONITOR and RESOURCE MONITOR. The full configuration is needed for autonomous operation on Moon or Mars, whereas a reduced version without the planning, schedule adaption and event monitoring functions could be appropriate for lower-autonomy use on the Moon. An implementation concept is suggested which is conservative in use of system resources and consists of modules combined with a network communications fabric. A language concept termed a scheduling calculus for rapidly performing essential on-board schedule adaption functions is introduced.

  13. Design and implementation of priority and time-window based traffic scheduling and routing-spectrum allocation mechanism in elastic optical networks

    NASA Astrophysics Data System (ADS)

    Wang, Honghuan; Xing, Fangyuan; Yin, Hongxi; Zhao, Nan; Lian, Bizhan

    2016-02-01

    With the explosive growth of network services, the reasonable traffic scheduling and efficient configuration of network resources have an important significance to increase the efficiency of the network. In this paper, an adaptive traffic scheduling policy based on the priority and time window is proposed and the performance of this algorithm is evaluated in terms of scheduling ratio. The routing and spectrum allocation are achieved by using the Floyd shortest path algorithm and establishing a node spectrum resource allocation model based on greedy algorithm, which is proposed by us. The fairness index is introduced to improve the capability of spectrum configuration. The results show that the designed traffic scheduling strategy can be applied to networks with multicast and broadcast functionalities, and makes them get real-time and efficient response. The scheme of node spectrum configuration improves the frequency resource utilization and gives play to the efficiency of the network.

  14. Fair fund distribution for a municipal incinerator using GIS-based fuzzy analytic hierarchy process.

    PubMed

    Chang, Ni-Bin; Chang, Ying-Hsi; Chen, Ho-Wen

    2009-01-01

    Burning municipal solid waste (MSW) can generate energy and reduce the waste volume, which delivers benefits to society through resources conservation. But current practices by society are not sustainable because the associated environmental impacts of waste incineration on urbanized regions have been a long-standing concern in local communities. Public reluctance with regard to accepting the incinerators as typical utilities often results in an intensive debate concerning how much welfare is lost for those residents living in the vicinity of those incinerators. As the measure of welfare change with respect to environmental quality constraints nearby these incinerators remains critical, new arguments related to how to allocate the fair fund among affected communities became a focal point in environmental management. Given the fact that most County fair fund rules allow a great deal of flexibility for redistribution, little is known about what type of methodology may be a good fit to determine the distribution of such a fair fund under uncertainty. This paper purports to demonstrate a system-based approach that helps any fair fund distribution, which is made with respect to residents' possible claim for fair damages due to the installation of a new incinerator. Holding a case study using integrated geographic information system (GIS) and fuzzy analytic hierarchy process (FAHP) for finding out the most appropriate distribution strategy between two neighboring towns in Taipei County, Taiwan demonstrates the application potential. Participants in determining the use of a fair fund also follow a highly democratic procedure where all stakeholders involved eventually express a high level of satisfaction with the results facilitating the final decision making process. It ensures that plans for the distribution of such a fair fund were carefully thought out and justified with a multi-faceted nature that covers political, socio-economic, technical, environmental, public health, and industrial aspects.

  15. Scheduling rules to achieve lead-time targets in outpatient appointment systems.

    PubMed

    Nguyen, Thu-Ba T; Sivakumar, Appa Iyer; Graves, Stephen C

    2017-12-01

    This paper considers how to schedule appointments for outpatients, for a clinic that is subject to appointment lead-time targets for both new and returning patients. We develop heuristic rules, which are the exact and relaxed appointment scheduling rules, to schedule each new patient appointment (only) in light of uncertainty about future arrivals. The scheduling rules entail two decisions. First, the rules need to determine whether or not a patient's request can be accepted; then, if the request is not rejected, the rules prescribe how to assign the patient to an available slot. The intent of the scheduling rules is to maximize the utilization of the planned resource (i.e., the physician staff), or equivalently to maximize the number of patients that are admitted, while maintaining the service targets on the median, the 95th percentile, and the maximum appointment lead-times. We test the proposed scheduling rules with numerical experiments using real data from the chosen clinic of Tan Tock Seng hospital in Singapore. The results show the efficiency and the efficacy of the scheduling rules, in terms of the service-target satisfaction and the resource utilization. From the sensitivity analysis, we find that the performance of the proposed scheduling rules is fairly robust to the specification of the established lead-time targets.

  16. Dispatch Scheduling of Automated Telescopes

    NASA Astrophysics Data System (ADS)

    Denny, R. B.

    2004-05-01

    Automated telescope scheduling systems have traditionally focused on optimiz- ing the use of the observatory, minimizing overhead and maximizing shutter- open time. However, educational and amateur observatories do not enjoy con- sistently good skies. Conditions can change significantly during an observing session, leading to schedule breakage. This gives rise to the need for a scheduling system that is capable of recovering from periods of bad skies, wind, etc. without operator intervention. The concept of dispatch scheduling, where the scheduler makes a "best" choice for the next observation, will be discussed. The choice of next target must consider constraints such as mini- mum altitude or maximum air mass, moon illumination, and sky condition, as well as timing constraints that may arise from linked observations and/or target phasing requirements. It also must be as fair and efficient as prac- tical. A dispatch scheduler (ACPS) was constructed and used to perform a num- ber of simulations with both isolated and multiple/linked observations, and noisy timing. By varying "best next target" choice algorithm, these simula- tions provided insight into the behavior of a dispatch scheduler. This talk will describe the scheduler and present the results of these preliminary sim- ulations, some conclusions that arose from them, and outline areas for fur- ther research.

  17. 78 FR 52209 - Proposed Fee Schedule for Commercial Filming and Still Photography Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-22

    ... fees would be based on sound business management principles and would provide a fair return to the... DEPARTMENT OF THE INTERIOR Bureau of Land Management, Fish and Wildlife Service National Park... Management, U.S. Fish and Wildlife Service, National Park Service, Interior; Forest Service, Agriculture...

  18. 14 CFR 1264.118 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... shall schedule at least one prehearing conference at a reasonable time in advance of the hearing. (c...; (9) The time and place for the hearing; and (10) Such other matters, including settlement, as may tend to expedite the fair and just disposition of the proceedings. (d) The presiding officer may issue...

  19. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... simple property interest (e.g., conservation easement), fee simple property acquisition, or a combination... simple options) to establish adequate long-term state control; an estimate of the fair market value of any property interest—which is proposed for acquisition; a schedule estimating the time required to...

  20. Restructuring Teacher Pay to Reward Excellence

    ERIC Educational Resources Information Center

    National Council on Teacher Quality, 2010

    2010-01-01

    When negotiating new teacher contracts, most districts, no doubt, are focusing discussions on averting wage freezes and massive layoffs. But prudent districts--those looking for long-term solutions to budget problems as well as those seeking to more fairly compensate the most effective teachers--are reconsidering the traditional salary schedule,…

  1. 24 CFR 108.25 - Compliance meeting.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Compliance meeting. 108.25 Section... COMPLIANCE PROCEDURES FOR AFFIRMATIVE FAIR HOUSING MARKETING § 108.25 Compliance meeting. (a) Scheduling meeting. If an applicant fails to comply with requirements under § 108.15 or § 108.20 or it appears that...

  2. Automated Planning and Scheduling for Planetary Rover Distributed Operations

    NASA Technical Reports Server (NTRS)

    Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve

    1999-01-01

    Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

  3. Depression Screening at a Community Health Fair: Descriptives and Treatment Linkage.

    PubMed

    Opperman, Kiel J; Hanson, Devin M; Toro, Paul A

    2017-08-01

    Health fairs are a cost-efficient platform for dissemination of preventive services to vulnerable populations. Effectiveness of depression screenings and associated treatment linkage via community health fairs warrants investigation. This study offers the first examination of a depression screening at a community health fair in 261 adult men (18-87years). The PHQ-9 was administered via interview by graduate students and on-site psychiatric nurses were available for a brief consultation for those interested. Over a quarter of participants screened positive for at least moderate depressive symptomatology. Of those who screened positive, 35.8% met with an on-site psychiatric nurse for a consultation. At six-month follow-up, none of the participants given a referral made an appointment at the community mental health agency. This suggests the importance of providing on-site clinician consultations at health fairs and the need for a more coordinated system to schedule future appointments while at the event. Community health fairs reach vulnerable populations, such as those who are uninsured and who have not spoken with a professional about mental health concerns. By conducting depression screening and providing onsite access to a mental health consultation at community health fairs, participants are better able to identify their depressive symptoms and are introduced to ways to treat depression. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Gender, justice and work: a distributive approach to perceptions of housework fairness.

    PubMed

    Perales, Francisco; Baxter, Janeen; Tai, Tsui-o

    2015-05-01

    Most women and men report that the division of domestic labor in their household is fair, despite women undertaking approximately seventy percent of housework. This raises questions about how fairness is evaluated within partnerships. We explore how parenthood and relationship transitions affect perceptions of housework fairness using panel data from the Household, Income and Labour Dynamics in Australia Survey and panel regression models. Our results indicate that net of actual housework divisions, socio-demographic factors, time availability and relative resources, the transition to parenthood increases women's perceptions of housework fairness immediately following the birth of a child, but decreases them in the long run. Relationship transitions have no independent effects. Our findings suggest that parenthood transitions are associated with changes in women's identity, cognitive evaluations of fairness and feelings of entitlement, as indicated by distributive justice theory. Copyright © 2015 Elsevier Inc. All rights reserved.

  5. How much inequality in income is fair? A microeconomic game theoretic perspective

    NASA Astrophysics Data System (ADS)

    Venkatasubramanian, Venkat; Luo, Yu; Sethuraman, Jay

    2015-10-01

    The increasing inequality in income and wealth in recent years, and the associated excessive pay packages of CEOs in the US and elsewhere, is of growing concern among policy makers as well as the common person. However, there seems to be no satisfactory answer, in conventional economic theories and models, to the fundamental questions of what kind of income distribution we ought to see, at least under ideal conditions, in a free market environment, and whether this distribution is fair. We propose a novel microeconomic game theoretic framework that addresses these questions and proves that the lognormal distribution is the fairest inequality of pay in an organization comprising of homogeneous agents, under ideal free market conditions at equilibrium. We also show that for a population of two different classes of agents, the equilibrium distribution is a combination of two different lognormal distributions where one of them, corresponding to the top ˜3-5% of the population, can be misidentified as a Pareto distribution. We compare our predictions with empirical data on global income inequality trends provided by Piketty and others. Our analysis suggests that the Scandinavian countries, and to a lesser extent Switzerland, Netherlands and Australia, have managed to get close to the ideal distribution for the bottom ˜99% of the population, while the US and UK remain less fair at the other extreme. Other European countries such as France and Germany, and Japan and Canada, are in the middle. Our theory also shows the deep and direct connection between potential game theory and statistical mechanics through entropy, which we identify as a measure of fairness in a distribution. This leads us to propose the fair market hypothesis, that the self-organizing dynamics of the ideal free market, i.e., Adam Smith's "invisible hand", not only promotes efficiency but also maximizes fairness under the given constraints.

  6. TDRS-L Spacecraft is Lifted Onto Transporter

    NASA Image and Video Library

    2014-01-10

    TITUSVILLE, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is being mounted on a transporter for its trip from the Astrotech payload processing facility in Titusville to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Kim Shiflett

  7. TDRS-L Spacecraft Transported from Astrotech to SLC

    NASA Image and Video Library

    2014-01-13

    TITUSVILLE, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft begins it trip from the Astrotech payload processing facility in Titusville to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis

  8. TDRS-L Spacecraft Transported from Astrotech to SLC

    NASA Image and Video Library

    2014-01-13

    CAPE CANAVERAL, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft arrives at Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis

  9. TDRS-L Spacecraft is Lifted Onto Transporter

    NASA Image and Video Library

    2014-01-10

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft has been encapsulated in its payload fairing in preparation for begin transported to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Kim Shiflett

  10. TDRS-L Spacecraft Transported from Astrotech to SLC

    NASA Image and Video Library

    2014-01-13

    CAPE CANAVERAL, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft is transported along the Saturn Causeway at the Kennedy Space Center on its way to Launch Complex 41 at Cape Canaveral Air Force Station. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on January 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis

  11. TDRS-L spacecraft lift to mate on Atlas V

    NASA Image and Video Library

    2014-01-13

    CAPE CANAVERAL, Fla. – Encapsulated in its payload fairing, NASA's Tracking and Data Relay Satellite, or TDRS-L, spacecraft arrives at Cape Canaveral Air Force Station's Vertical Integration Facility at Launch Complex 41. The TDRS-L satellite will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop a United Launch Alliance Atlas V rocket on Jan. 23, 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html Photo credit: NASA/Dimitri Gerondidakis

  12. TDRS-L Media Day

    NASA Image and Video Library

    2014-01-03

    TITUSVILLE, Fla. – Inside the Astrotech payload processing facility in Titusville, members of the news media are given an opportunity for an up-close look at the payload fairing that will encapsulate the Tracking and Data Relay Satellite, or TDRS-L, spacecraft. Journalists visited Astrotech as part of TDRS-L Media Day to conduct interviews and photograph the satellite that will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  13. KSC-2014-3013

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite sits atop a United Launch Alliance Delta II rocket prior to encapsulation in its payload fairing at Space Launch Complex 2 at Vandenberg Air Force Base in California. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  14. KSC-2014-3012

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, the payload fairing for NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite is being prepared for encapsulation atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  15. KSC-2014-3011

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite sits atop a United Launch Alliance Delta II rocket prior to encapsulation in its payload fairing at Space Launch Complex 2 at Vandenberg Air Force Base in California. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  16. KSC-2014-2993

    NASA Image and Video Library

    2014-06-16

    VANDENBERG AIR FORCE BASE, Calif. – Technicians in the Astrotech Payload Processing Facility on Vandenberg Air Force Base in California make final preparations to transport NASA's Orbiting Carbon Observatory-2, or OCO-2, to Space Launch Complex 2 for enclosure in the Delta II payload fairing. Launch aboard a United Launch Alliance Delta II rocket is scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  17. KSC-2014-2990

    NASA Image and Video Library

    2014-06-16

    VANDENBERG AIR FORCE BASE, Calif. – Final preparations are underway in the Astrotech Payload Processing Facility on Vandenberg Air Force Base in California to transport NASA's Orbiting Carbon Observatory-2, or OCO-2, to Space Launch Complex 2 for encapsulation in the Delta II payload fairing. Launch aboard a United Launch Alliance Delta II rocket is scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  18. KSC-2014-3010

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite sits atop a United Launch Alliance Delta II rocket prior to encapsulation in its payload fairing at Space Launch Complex 2 at Vandenberg Air Force Base in California. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  19. KSC-2014-3014

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite sits atop a United Launch Alliance Delta II rocket prior to encapsulation in its payload fairing at Space Launch Complex 2 at Vandenberg Air Force Base in California. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  20. KSC-2009-1724

    NASA Image and Video Library

    2009-02-19

    VANDENBERG AIR FORCE BASE, Calif. -- With the fairing door off, Orbital Sciences' Glenn Weigle and Brett Gladish take the GN2 flow reading on NASA's Orbiting Carbon Observatory, or OCO, spacecraft on Launch Complex 576-E at Vandenberg Air Force Base in California. The encapsulated OCO tops Orbital Sciences' Taurus XL rocket, which is scheduled to launch Feb. 24. The spacecraft sits atop Orbital Sciences' Taurus XL rocket. At right is a portion of the umbilical tower attached to the upper stack. The spacecraft sits atop Orbital Sciences' Taurus XL rocket. At right is a portion of the umbilical tower attached to the upper stack. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. Photo courtesy of Jim Stowers, Orbital Sciences

  1. Two-Step Fair Scheduling of Continuous Media Streams over Error-Prone Wireless Channels

    NASA Astrophysics Data System (ADS)

    Oh, Soohyun; Lee, Jin Wook; Park, Taejoon; Jo, Tae-Chang

    In wireless cellular networks, streaming of continuous media (with strict QoS requirements) over wireless links is challenging due to their inherent unreliability characterized by location-dependent, bursty errors. To address this challenge, we present a two-step scheduling algorithm for a base station to provide streaming of continuous media to wireless clients over the error-prone wireless links. The proposed algorithm is capable of minimizing the packet loss rate of individual clients in the presence of error bursts, by transmitting packets in the round-robin manner and also adopting a mechanism for channel prediction and swapping.

  2. KSC-07pd1721

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, workers complete encapsulation of the fairing around NASA's Dawn spacecraft. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  3. KSC-2011-1163

    NASA Image and Video Library

    2011-01-15

    VANDENBERG AIR FORCE BASE, Calif. -- A technician uncovers half of the payload fairing for the Glory mission after the section was moved to the East High Bay of the Astrotech payload processing facility at Vandenberg Air Force Base in California. The payload fairing will protect the Glory spacecraft from aerodynamic pressures and heating during the first part of its climb into orbit. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  4. 77 FR 51569 - Large Residential Washers From Korea and Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ...)] Large Residential Washers From Korea and Mexico Scheduling of the final phase of countervailing duty and... and Mexico of large residential washers, provided for in subheading 8450.20.00 of the Harmonized... and Mexico are being sold in the United States at less than fair value within the meaning of section...

  5. NASA Report to Educators, Vol. 4, No. 3, October 1976.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Washington, DC.

    This periodical presents a summary of the Viking Mission to Mars, a listing of Skylab science films with the address for additional information; a schedule of exhibits at National Aeronautics and Space Administration visitor centers; space shuttle news; announcements of International Science Fair Awards; and an annotated bibliography of meteorites…

  6. Agreement Between Michigan State University and Michigan State University Employees Association, July 1, 1974-June 30, 1976.

    ERIC Educational Resources Information Center

    Michigan State Univ., East Lansing.

    Articles of the agreement cover a definition of terms; fair employment practices; probationary employees; uniforms; working hours; compensation rate schedules; overtime; absences; leaves of absence with and without pay; break in service; insurance benefit programs; educational assistance program; longevity pay; retirement benefit programs; filling…

  7. 29 CFR 22.19 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... shall schedule at least one prehearing conference at a reasonable time in advance of the hearing. (c... dates for the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition of...

  8. 20 CFR 355.19 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... schedule at least one prehearing conference at a reasonable time in advance of the hearing. (c) The ALJ may... the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition of the...

  9. 22 CFR 35.19 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of any party, the ALJ shall schedule at least one prehearing conference at a reasonable time in...; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition of the proceedings. (d) The ALJ may issue an order containing all matters agreed...

  10. 7 CFR 1.320 - Prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) The ALJ may schedule a prehearing conference at a reasonable time in advance of the hearing and may... exhibits; (8) Discovery; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition of the proceedings. (d) The ALJ shall issue an order containing all...

  11. 29 CFR 22.19 - Prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... shall schedule at least one prehearing conference at a reasonable time in advance of the hearing. (c... dates for the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition of...

  12. 22 CFR 35.19 - Prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of any party, the ALJ shall schedule at least one prehearing conference at a reasonable time in...; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition of the proceedings. (d) The ALJ may issue an order containing all matters agreed...

  13. 20 CFR 355.19 - Prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... schedule at least one prehearing conference at a reasonable time in advance of the hearing. (c) The ALJ may... the exchange of witness lists and of proposed exhibits; (8) Discovery; (9) The time and place for the hearing; and (10) Such other matters as may tend to expedite the fair and just disposition of the...

  14. 75 FR 29364 - Certain Coated Paper Suitable for High-Quality Print Graphics Using Sheet-Fed Presses From China...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... Indonesia AGENCY: United States International Trade Commission. ACTION: Scheduling of the final phase of...-fair-value imports from China and Indonesia of certain coated paper, provided for in subheadings 4810...) are being provided to manufacturers, producers, or exporters in China and Indonesia of certain coated...

  15. Enabling Remote Health-Caring Utilizing IoT Concept over LTE-Femtocell Networks.

    PubMed

    Hindia, M N; Rahman, T A; Ojukwu, H; Hanafi, E B; Fattouh, A

    2016-01-01

    As the enterprise of the "Internet of Things" is rapidly gaining widespread acceptance, sensors are being deployed in an unrestrained manner around the world to make efficient use of this new technological evolution. A recent survey has shown that sensor deployments over the past decade have increased significantly and has predicted an upsurge in the future growth rate. In health-care services, for instance, sensors are used as a key technology to enable Internet of Things oriented health-care monitoring systems. In this paper, we have proposed a two-stage fundamental approach to facilitate the implementation of such a system. In the first stage, sensors promptly gather together the particle measurements of an android application. Then, in the second stage, the collected data are sent over a Femto-LTE network following a new scheduling technique. The proposed scheduling strategy is used to send the data according to the application's priority. The efficiency of the proposed technique is demonstrated by comparing it with that of well-known algorithms, namely, proportional fairness and exponential proportional fairness.

  16. Enabling Remote Health-Caring Utilizing IoT Concept over LTE-Femtocell Networks

    PubMed Central

    Hindia, M. N.; Rahman, T. A.; Ojukwu, H.; Hanafi, E. B.; Fattouh, A.

    2016-01-01

    As the enterprise of the “Internet of Things” is rapidly gaining widespread acceptance, sensors are being deployed in an unrestrained manner around the world to make efficient use of this new technological evolution. A recent survey has shown that sensor deployments over the past decade have increased significantly and has predicted an upsurge in the future growth rate. In health-care services, for instance, sensors are used as a key technology to enable Internet of Things oriented health-care monitoring systems. In this paper, we have proposed a two-stage fundamental approach to facilitate the implementation of such a system. In the first stage, sensors promptly gather together the particle measurements of an android application. Then, in the second stage, the collected data are sent over a Femto-LTE network following a new scheduling technique. The proposed scheduling strategy is used to send the data according to the application’s priority. The efficiency of the proposed technique is demonstrated by comparing it with that of well-known algorithms, namely, proportional fairness and exponential proportional fairness. PMID:27152423

  17. How Power Mechanism Influence Channel Bilateral Opportunism

    NASA Astrophysics Data System (ADS)

    Tian, Yu; Chen, Shaodan

    In the background of marketing channel power asymmetry structure, this article discuss the relation between power dominant member’s use of power mechanism and the opportunism behavior of both Power disadvantage member and the power dominant member itself, and test whether distributive fairness perception and procedural fairness perception have moderate effects on this relation. The result shows that, the power dominant member’s use of coercive power will increase the opportunistic tendency of both sides; in contrast, the power dominant member’s use of noncorecive power will inhibit such tendency. Distributive fairness perception and procedural fairness perception negatively moderate the relation between power dominant member’s use of noncorecive power and power disadvantage member’s opportunism. Procedural fairness perception also negatively moderates the relation between power dominant member’s use of coercive power and the other side’s opportunism.

  18. Optimal Resource Allocation for NOMA-TDMA Scheme with α-Fairness in Industrial Internet of Things.

    PubMed

    Sun, Yanjing; Guo, Yiyu; Li, Song; Wu, Dapeng; Wang, Bin

    2018-05-15

    In this paper, a joint non-orthogonal multiple access and time division multiple access (NOMA-TDMA) scheme is proposed in Industrial Internet of Things (IIoT), which allowed multiple sensors to transmit in the same time-frequency resource block using NOMA. The user scheduling, time slot allocation, and power control are jointly optimized in order to maximize the system α -fair utility under transmit power constraint and minimum rate constraint. The optimization problem is nonconvex because of the fractional objective function and the nonconvex constraints. To deal with the original problem, we firstly convert the objective function in the optimization problem into a difference of two convex functions (D.C.) form, and then propose a NOMA-TDMA-DC algorithm to exploit the global optimum. Numerical results show that the NOMA-TDMA scheme significantly outperforms the traditional orthogonal multiple access scheme in terms of both spectral efficiency and user fairness.

  19. Model to Test Electric Field Comparisons in a Composite Fairing Cavity

    NASA Technical Reports Server (NTRS)

    Trout, Dawn; Burford, Janessa

    2012-01-01

    Evaluating the impact of radio frequency transmission in vehicle fairings is important to sensitive spacecraft. This study shows cumulative distribution function (CDF) comparisons of composite . a fairing electromagnetic field data obtained by computational electromagnetic 3D full wave modeling and laboratory testing. This work is an extension of the bare aluminum fairing perfect electric conductor (PEC) model. Test and model data correlation is shown.

  20. Model to Test Electric Field Comparisons in a Composite Fairing Cavity

    NASA Technical Reports Server (NTRS)

    Trout, Dawn H.; Burford, Janessa

    2013-01-01

    Evaluating the impact of radio frequency transmission in vehicle fairings is important to sensitive spacecraft. This study shows cumulative distribution function (CDF) comparisons of composite a fairing electromagnetic field data obtained by computational electromagnetic 3D full wave modeling and laboratory testing. This work is an extension of the bare aluminum fairing perfect electric conductor (PEC) model. Test and model data correlation is shown.

  1. 47 CFR 73.7002 - Fair distribution of service on reserved band FM channels.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... enunciated in section 307(b) of the Communications Act, 47 U.S.C. 307(b). (b) In an analysis performed... 47 Telecommunication 4 2010-10-01 2010-10-01 false Fair distribution of service on reserved band FM channels. 73.7002 Section 73.7002 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED...

  2. 47 CFR 73.7002 - Fair distribution of service on reserved band FM channels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... enunciated in section 307(b) of the Communications Act, 47 U.S.C. 307(b). (b) In an analysis performed... 47 Telecommunication 4 2011-10-01 2011-10-01 false Fair distribution of service on reserved band FM channels. 73.7002 Section 73.7002 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED...

  3. 47 CFR 73.7002 - Fair distribution of service on reserved band FM channels.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... enunciated in section 307(b) of the Communications Act, 47 U.S.C. 307(b). (b) In an analysis performed... 47 Telecommunication 4 2014-10-01 2014-10-01 false Fair distribution of service on reserved band FM channels. 73.7002 Section 73.7002 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED...

  4. 47 CFR 73.7002 - Fair distribution of service on reserved band FM channels.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... enunciated in section 307(b) of the Communications Act, 47 U.S.C. 307(b). (b) In an analysis performed... 47 Telecommunication 4 2012-10-01 2012-10-01 false Fair distribution of service on reserved band FM channels. 73.7002 Section 73.7002 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED...

  5. 47 CFR 73.7002 - Fair distribution of service on reserved band FM channels.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... enunciated in section 307(b) of the Communications Act, 47 U.S.C. 307(b). (b) In an analysis performed... 47 Telecommunication 4 2013-10-01 2013-10-01 false Fair distribution of service on reserved band FM channels. 73.7002 Section 73.7002 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED...

  6. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  7. Collaborative Scheduling Using JMS in a Mixed Java and .NET Environment

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Wax, Allan; Lam, Ray; Baldwin, John; Borden, Chet

    2006-01-01

    A viewgraph presentation to demonstrate collaborative scheduling using Java Message Service (JMS) in a mixed Java and .Net environment is given. The topics include: 1) NASA Deep Space Network scheduling; 2) Collaborative scheduling concept; 3) Distributed computing environment; 4) Platform concerns in a distributed environment; 5) Messaging and data synchronization; and 6) The prototype.

  8. EQUITY EVALUATION OF PADDY IRRIGATION WATER DISTRIBUTION BY SOCIETY-JUSTICE-WATER DISTRIBUTION RULE HYPOTHESIS

    NASA Astrophysics Data System (ADS)

    Tanji, Hajime; Kiri, Hirohide; Kobayashi, Shintaro

    When total supply is smaller than total demand, it is difficult to apply the paddy irrigation water distribution rule. The gap must be narrowed by decreasing demand. Historically, the upstream served rule, rotation schedule, or central schedule weight to irrigated area was adopted. This paper proposes the hypothesis that these rules are dependent on social justice, a hypothesis called the "Society-Justice-Water Distribution Rule Hypothesis". Justice, which means a balance of efficiency and equity of distribution, is discussed under the political philosophy of utilitarianism, liberalism (Rawls), libertarianism, and communitarianism. The upstream served rule can be derived from libertarianism. The rotation schedule and central schedule can be derived from communitarianism. Liberalism can provide arranged schedule to adjust supply and demand based on "the Difference Principle". The authors conclude that to achieve efficiency and equity, liberalism may provide the best solution after modernization.

  9. Community College Students Need Fair Job Scheduling Practices. Fact Sheet #C420

    ERIC Educational Resources Information Center

    Reichlin, Lindsey; Gault, Barbara

    2014-01-01

    This paper discusses the challenges that community college students face as a result of holding a job while pursuing a postsecondary education. Working is often critical to community college students' ability to pursue a postsecondary education, but holding a job while in school can threaten a student's success in college. For students to succeed…

  10. Obama Plays Cheerleader for STEM

    ERIC Educational Resources Information Center

    Robelen, Erik W.

    2010-01-01

    Amid a struggling economy, a raft of foreign-policy headaches, and the tail end of a heated campaign season, President Barack Obama carved out time in his schedule last month to watch students in the State Dining Room demonstrate a solar-powered model car, a water-purification system, and a soccer-playing robot. The science fair was the fifth…

  11. Efficient Trajectory Options Allocation for the Collaborative Trajectory Options Program

    NASA Technical Reports Server (NTRS)

    Rodionova, Olga; Arneson, Heather; Sridhar, Banavar; Evans, Antony

    2017-01-01

    The Collaborative Trajectory Options Program (CTOP) is a Traffic Management Initiative (TMI) intended to control the air traffic flow rates at multiple specified Flow Constrained Areas (FCAs), where demand exceeds capacity. CTOP allows flight operators to submit the desired Trajectory Options Set (TOS) for each affected flight with associated Relative Trajectory Cost (RTC) for each option. CTOP then creates a feasible schedule that complies with capacity constraints by assigning affected flights with routes and departure delays in such a way as to minimize the total cost while maintaining equity across flight operators. The current version of CTOP implements a Ration-by-Schedule (RBS) scheme, which assigns the best available options to flights based on a First-Scheduled-First-Served heuristic. In the present study, an alternative flight scheduling approach is developed based on linear optimization. Results suggest that such an approach can significantly reduce flight delays, in the deterministic case, while maintaining equity as defined using a Max-Min fairness scheme.

  12. QoS-Oriented High Dynamic Resource Allocation in Vehicular Communication Networks

    PubMed Central

    2014-01-01

    Vehicular ad hoc networks (VANETs) are emerging as new research area and attracting an increasing attention from both industry and research communities. In this context, a dynamic resource allocation policy that maximizes the use of available resources and meets the quality of service (QoS) requirement of constraining applications is proposed. It is a combination of a fair packet scheduling policy and a new adaptive QoS oriented call admission control (CAC) scheme based on the vehicle density variation. This scheme decides whether the connection request is to be admitted into the system, while providing fair access and guaranteeing the desired throughput. The proposed algorithm showed good performance in testing in real world environment. PMID:24616639

  13. KSC-07pd1714

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, the first half of the fairing is lifted into the mobile service tower for encapsulation around NASA's Dawn spacecraft. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  14. KSC-07pd1715

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, workers prepare the first half of the fairing for encapsulation around NASA's Dawn spacecraft. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  15. KSC-07pd1716

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, a worker oversees the movement of the first half of the fairing toward NASA's Dawn spacecraft for encapsulation. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  16. KSC-07pd1720

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, the second half of the fairing moves toward NASA's Dawn spacecraft to complete encapsulation. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  17. KSC-07pd1718

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, workers supervise the movement of the first half of the fairing toward NASA's Dawn spacecraft for encapsulation. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  18. KSC-07pd1713

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- NASA's Dawn spacecraft waits for fairing encapsulation in the mobile service tower of Launch Pad 17-B at Cape Canaveral Air Force Station in Florida. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  19. KSC-07pd1717

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, the first half of the fairing moves toward NASA's Dawn spacecraft for encapsulation. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  20. KSC-07pd1719

    NASA Image and Video Library

    2007-07-01

    KENNEDY SPACE CENTER, FLA. -- On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, workers supervise the movement of the first half of the fairing toward NASA's Dawn spacecraft for encapsulation. The fairing is a molded structure that fits flush with the outside surface of the Delta II upper stage booster and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. Dawn's goal is to characterize the conditions and processes of the solar system's earliest epoch 4.5 billion years ago by investigating in detail two of the largest asteroids, Ceres and Vesta. They reside between Mars and Jupiter in the asteroid belt. Launch is scheduled for July 8. Photo credit: NASA/Amanda Diller

  1. SIRTF Encapsulation

    NASA Image and Video Library

    2003-04-10

    In the launch tower on Launch Complex 17-B, Cape Canaveral Air Force Station, the first part of the fairing is place around the Space Infrared Telescope Facility (SIRTF). The fairing protects the spacecraft during launch. SIRTF will obtain images and spectra by detecting the infrared energy, or heat, radiated by objects in space. Most of this infrared radiation is blocked by the Earth's atmosphere and cannot be observed from the ground. Consisting of an 0.85-meter telescope and three cryogenically cooled science instruments, SIRTF is one of NASA's largest infrared telescopes to be launched. SIRTF is currently scheduled for launch April 18 aboard a Delta II rocket from Launch Complex 17-B, Cape Canaveral Air Force Station.

  2. KSC-04PD-2318

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Boeing workers help guide a section of the fairing into place around the Swift spacecraft inside the mobile service tower on Launch Pad 17-A, Cape Canaveral Air Force Station. The fairing is being installed around the payload for protection during launch and ascent. A Boeing Delta II rocket is the launch vehicle for the Swift spacecraft and its Gamma-Ray Burst Mission. Swift is a first-of-its-kind multi-wavelength observatory dedicated to the study of gamma-ray burst science. Its three instruments will work together to observe GRBs and afterglows in the gamma ray, X-ray, ultraviolet and optical wavebands. Swift is scheduled to launch Nov. 17 at 12:09 p.m. EST.

  3. KSC-05PD-1782

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Workers in the Payload Hazardous Servicing Facility maneuver the second half of the fairing toward the Mars Reconnaissance Orbiter (right) for installation. The fairing protects the spacecraft during launch and flight through the atmosphere. Once in space, it is jettisoned. Launch of the MRO aboard an Atlas V rocket will be from Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The MRO is the next major step in Mars exploration and scheduled for launch from Cape Canaveral Air Force Station in a window opening Aug. 10. The MRO is an important next step in fulfilling NASAs vision of space exploration and ultimately sending human explorers to Mars and beyond.

  4. KSC-05PD-1783

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Workers in the Payload Hazardous Servicing Facility stand by as the first half of the fairing (left) is moved closer to the Mars Reconnaissance Orbiter (right) for installation. The fairing protects the spacecraft during launch and flight through the atmosphere. Once in space, it is jettisoned. Launch of the MRO aboard an Atlas V rocket will be from Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The MRO is the next major step in Mars exploration and scheduled for launch from Cape Canaveral Air Force Station in a window opening Aug. 10. The MRO is an important next step in fulfilling NASAs vision of space exploration and ultimately sending human explorers to Mars and beyond.

  5. KSC-2011-1162

    NASA Image and Video Library

    2011-01-15

    VANDENBERG AIR FORCE BASE, Calif. -- A technician works in the Astrotech payload processing facility at Vandenberg Air Force Base in California before the pieces that will make up the payload fairing for the Glory mission are moved to the East High Bay. The payload fairing will protect the Glory spacecraft from aerodynamic pressures and heating during the first part of its climb into orbit. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  6. Adolescents' Conceptions of National Wealth Distribution: Connections with Perceived Societal Fairness and Academic Plans

    ERIC Educational Resources Information Center

    Arsenio, William F.; Willems, Chris

    2017-01-01

    This study examined mostly lower-middle-income Latino (37%) and African American (33%) adolescents' (N = 90, M[subscript age] = 15.90) conceptions of how U.S. wealth is and ought to be distributed, and whether these judgments are related to adolescents' views about societal and legal fairness and their immediate academic plans. Individually…

  7. The Power of Flexibility: Autonomous Agents That Conserve Energy in Commercial Buildings

    NASA Astrophysics Data System (ADS)

    Kwak, Jun-young

    Agent-based systems for energy conservation are now a growing area of research in multiagent systems, with applications ranging from energy management and control on the smart grid, to energy conservation in residential buildings, to energy generation and dynamic negotiations in distributed rural communities. Contributing to this area, my thesis presents new agent-based models and algorithms aiming to conserve energy in commercial buildings. More specifically, my thesis provides three sets of algorithmic contributions. First, I provide online predictive scheduling algorithms to handle massive numbers of meeting/event scheduling requests considering flexibility , which is a novel concept for capturing generic user constraints while optimizing the desired objective. Second, I present a novel BM-MDP ( Bounded-parameter Multi-objective Markov Decision Problem) model and robust algorithms for multi-objective optimization under uncertainty both at the planning and execution time. The BM-MDP model and its robust algorithms are useful in (re)scheduling events to achieve energy efficiency in the presence of uncertainty over user's preferences. Third, when multiple users contribute to energy savings, fair division of credit for such savings to incentivize users for their energy saving activities arises as an important question. I appeal to cooperative game theory and specifically to the concept of Shapley value for this fair division. Unfortunately, scaling up this Shapley value computation is a major hindrance in practice. Therefore, I present novel approximation algorithms to efficiently compute the Shapley value based on sampling and partitions and to speed up the characteristic function computation. These new models have not only advanced the state of the art in multiagent algorithms, but have actually been successfully integrated within agents dedicated to energy efficiency: SAVES, TESLA and THINC. SAVES focuses on the day-to-day energy consumption of individuals and groups in commercial buildings by reactively suggesting energy conserving alternatives. TESLA takes a long-range planning perspective and optimizes overall energy consumption of a large number of group events or meetings together. THINC provides an end-to-end integration within a single agent of energy efficient scheduling, rescheduling and credit allocation. While SAVES, TESLA and THINC thus differ in their scope and applicability, they demonstrate the utility of agent-based systems in actually reducing energy consumption in commercial buildings. I evaluate my algorithms and agents using extensive analysis on data from over 110,000 real meetings/events at multiple educational buildings including the main libraries at the University of Southern California. I also provide results on simulations and real-world experiments, clearly demonstrating the power of agent technology to assist human users in saving energy in commercial buildings.

  8. The R-Shell approach - Using scheduling agents in complex distributed real-time systems

    NASA Technical Reports Server (NTRS)

    Natarajan, Swaminathan; Zhao, Wei; Goforth, Andre

    1993-01-01

    Large, complex real-time systems such as space and avionics systems are extremely demanding in their scheduling requirements. The current OS design approaches are quite limited in the capabilities they provide for task scheduling. Typically, they simply implement a particular uniprocessor scheduling strategy and do not provide any special support for network scheduling, overload handling, fault tolerance, distributed processing, etc. Our design of the R-Shell real-time environment fcilitates the implementation of a variety of sophisticated but efficient scheduling strategies, including incorporation of all these capabilities. This is accomplished by the use of scheduling agents which reside in the application run-time environment and are responsible for coordinating the scheduling of the application.

  9. Mutual Coupling of Internal Transmit/Receive Pair in Launch Vehicle Fairing Model Using WIPL-D

    NASA Technical Reports Server (NTRS)

    Trout, Dawn H.; Stanley, James E.; Wahid, Parveen F.

    2011-01-01

    Evaluating the fairing Radio Frequency (RF) Environment within the launch vehicle payload fairing cavity due to internal transmitters is an issue for the spacecraft and launch vehicle industry. This paper provides an effective approach for launch vehicle fairing evaluation of power reception and field distribution due to internal transmitters. A commercial electromagnetic computational tool, WIPL-D is applied in this study for test data comparison.

  10. The temporal organization of behavior on periodic food schedules.

    PubMed Central

    Reid, A K; Bacha, G; Morán, C

    1993-01-01

    Various theories of temporal control and schedule induction imply that periodic schedules temporally modulate an organism's motivational states within interreinforcement intervals. This speculation has been fueled by frequently observed multimodal activity distributions created by averaging across interreinforcement intervals. We tested this hypothesis by manipulating the cost associated with schedule-induced activities and the availability of other activities to determine the degree to which (a) the temporal distributions of activities within the interreinforcement interval are fixed or can be temporally displaced, (b) rats can reallocate activities across different interreinforcement intervals, and (c) noninduced activities can substitute for schedule-induced activities. Obtained multimodal activity distributions created by averaging across interreinforcement intervals were not representative of the transitions occurring within individual intervals, so the averaged multimodal distributions should not be assumed to represent changes in the subject's motivational states within the interval. Rather, the multimodal distributions often result from averaging across interreinforcement intervals in which only a single activity occurs. A direct influence of the periodic schedule on the motivational states implies that drinking and running should occur at different periods within the interval, but in three experiments the starting times of drinking and running within interreinforcement intervals were equal. Thus, the sequential pattern of drinking and running on periodic schedules does not result from temporal modulation of motivational states within interreinforcement intervals. PMID:8433061

  11. Income inequality, distributive fairness and political trust in Latin America.

    PubMed

    Zmerli, Sonja; Castillo, Juan Carlos

    2015-07-01

    In the wake of rising levels of income inequality during the past two decades, widespread concerns emerged about the social and political consequences of the widening gap between the poor and the rich that can be observed in many established democracies. Several empirical studies substantiate the link between macro-level income inequality and political attitudes and behavior, pointing at its broad and negative implications for political equality. Accordingly, these implications are expected to be accentuated in contexts of high inequality, as is the case in Latin America. Despite these general concerns about the consequences of income inequality, few studies have accounted for the importance of individual perceptions of distributive fairness in regard to trust in political institutions. Even less is known about the extent to which distributive fairness perceptions co-vary with objective indicators of inequality. Moreover, the research in this area has traditionally focused on OECD countries, which have lower indexes of inequality than the rest of the world. This study aims at filling this gap by focusing on the relevance of distributive fairness perceptions and macro-level inequality for political trust and on how these two levels interact in Latin American countries. The analyses are based on the Latinobarometer survey 2011, which consists of 18 countries. Multilevel estimations suggest that both dimensions of inequality are negatively associated with political trust but that higher levels of macro-level inequality attenuate rather than increase the strength of the negative association between distributive fairness perceptions and political trust. Copyright © 2015 Elsevier Inc. All rights reserved.

  12. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  13. Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1992-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

  14. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  15. 75 FR 13130 - General Services Administration Acquisition Regulation; Submission for OMB Review; Submission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... Authorized FSS Schedule Price Lists, Contract Price Lists, and Dissemination of Information by Contractor... Distribution of Authorized FSS Schedule Price Lists, Contract Price Lists, and Dissemination of Information by..., Submission and Distribution of Authorized FSS Schedule Price Lists, Contract Price Lists, and Dissemination...

  16. How fair is an equitable distribution?

    NASA Astrophysics Data System (ADS)

    Ramírez Barrios, Elena; Díaz Ochoa, Juan G.; Schneider, Johannes J.

    2007-01-01

    Envy is a rather complex and irrational emotion. In general, it is very difficult to obtain a measure of this feeling, but in an economical context envy becomes an observable which can be measured. When various individuals compare their possessions, envy arises due to the inequality of their different allocations of commodities and different preferences. In this paper, we show that an equitable distribution of goods does not guarantee a state of fairness between agents and in general that envy cannot be controlled by tuning the distribution of goods.

  17. 26 CFR 1.468B-9 - Disputed ownership funds.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... market value of the property on the date of transfer to the fund, and the fund's holding period begins on... is the fair market value of that property on the date of distribution. (ii) Denial of deduction. A... ownership fund will take a fair market value basis in the receivable and will not include the fair market...

  18. 26 CFR 1.468B-9 - Disputed ownership funds.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... market value of the property on the date of transfer to the fund, and the fund's holding period begins on... is the fair market value of that property on the date of distribution. (ii) Denial of deduction. A... ownership fund will take a fair market value basis in the receivable and will not include the fair market...

  19. 26 CFR 1.468B-9 - Disputed ownership funds.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... market value of the property on the date of transfer to the fund, and the fund's holding period begins on... is the fair market value of that property on the date of distribution. (ii) Denial of deduction. A... ownership fund will take a fair market value basis in the receivable and will not include the fair market...

  20. Adolescents' perceptions of institutional fairness: relations with moral reasoning, emotions, and behavior.

    PubMed

    Arsenio, William F; Preziosi, Susanna; Silberstein, Erica; Hamburger, Benjamin

    2012-01-01

    This article addresses how low-income urban adolescents view the fairness of different aspects of American society, including how wealth is distributed, the nature of legal constraints, and overall social opportunities and legitimacy. This research emerged from efforts to understand the moral and emotional nature of some adolescents' aggressive tendencies. Recently it has become clearer that aggression can serve many purposes and that, for some adolescents, aggression is a coherent though problematic response to larger familial, neighborhood, and institutional forces. Consequently, the authors focus on the connections between low-income adolescents' perceptions of institutional and interpersonal fairness, certain aggressive tendencies, and related emotion judgments. At the same time, relatively little is known about how low-income adolescents as a group perceive the fairness of wealth distribution and other broad aspects of American society. Consequently, a second important goal is to examine these adolescents' normative beliefs about institutional fairness at a time of growing financial and educational inequalities in the United States. Copyright © 2013 Wiley Periodicals, Inc., A Wiley Company.

  1. Steel Alloy Hot Roll Simulations and Through-Thickness Variation Using Dislocation Density-Based Modeling

    NASA Astrophysics Data System (ADS)

    Jansen Van Rensburg, G. J.; Kok, S.; Wilke, D. N.

    2017-10-01

    Different roll pass reduction schedules have different effects on the through-thickness properties of hot-rolled metal slabs. In order to assess or improve a reduction schedule using the finite element method, a material model is required that captures the relevant deformation mechanisms and physics. The model should also report relevant field quantities to assess variations in material state through the thickness of a simulated rolled metal slab. In this paper, a dislocation density-based material model with recrystallization is presented and calibrated on the material response of a high-strength low-alloy steel. The model has the ability to replicate and predict material response to a fair degree thanks to the physically motivated mechanisms it is built on. An example study is also presented to illustrate the possible effect different reduction schedules could have on the through-thickness material state and the ability to assess these effects based on finite element simulations.

  2. Personnel scheduling using an integer programming model- an application at Avanti Blue-Nile Hotels.

    PubMed

    Kassa, Biniyam Asmare; Tizazu, Anteneh Eshetu

    2013-01-01

    In this paper, we report perhaps a first of its kind application of management science in the Ethiopian hotel industry. Avanti Blue Nile Hotels, a newly established five star hotel in Bahir Dar, is the company for which we developed an integer programming model that determines an optimal weekly shift schedule for the Hotel's engineering department personnel while satisfying several constraints including weekly rest requirements per employee, rest requirements between working shifts per employee, required number of personnel per shift, and other constraints. The model is implemented on an excel solver routine. The model enables the company's personnel department management to develop a fair personnel schedule as needed and to effectively utilize personnel resources while satisfying several technical, legal and economic requirements. These encouraging achievements make us optimistic about the gains other Ethiopian organizations can amass by introducing management science approaches in their management planning and decision making systems.

  3. Interactivity vs. fairness in networked linux systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Wenji; Crawford, Matt; /Fermilab

    In general, the Linux 2.6 scheduler can ensure fairness and provide excellent interactive performance at the same time. However, our experiments and mathematical analysis have shown that the current Linux interactivity mechanism tends to incorrectly categorize non-interactive network applications as interactive, which can lead to serious fairness or starvation issues. In the extreme, a single process can unjustifiably obtain up to 95% of the CPU! The root cause is due to the facts that: (1) network packets arrive at the receiver independently and discretely, and the 'relatively fast' non-interactive network process might frequently sleep to wait for packet arrival. Thoughmore » each sleep lasts for a very short period of time, the wait-for-packet sleeps occur so frequently that they lead to interactive status for the process. (2) The current Linux interactivity mechanism provides the possibility that a non-interactive network process could receive a high CPU share, and at the same time be incorrectly categorized as 'interactive.' In this paper, we propose and test a possible solution to address the interactivity vs. fairness problems. Experiment results have proved the effectiveness of the proposed solution.« less

  4. The human factors of implementing shift work in logging operations.

    PubMed

    Mitchell, D L; Gallagher, T V; Thomas, R E

    2008-10-01

    A fairly recent development in the forest industry is the use of shift work in logging in the southeastern U.S. Logging company owners are implementing shift work as an opportunity to increase production and potentially reduce the cost of producing each unit of wood, without consideration of the potential impacts on the logging crew. There are many documented physiological and psychological impacts on workers from shift work in a variety of industries, although few address forestry workers in the U.S. Semi-structured interviews were performed to gather information about how logging company owners were implementing shift work in seven southeastern states. Data collected during the interviews included employee turnover, shift hours, shift scheduling, safety considerations, and production impacts. Various work schedules were employed. The majority of the schedules encompassed less than 24 hours per day. Permanent and rotating shift schedules were found. None of the logging company owners used more than two crews in a 24-hour period. Additional safety precautions were implemented as a result of working after dark. No in-woods worker accidents or injuries were reported by any of those interviewed. Results indicate that a variety of work schedules can be successfully implemented in the southeastern logging industry.

  5. A new distributed systems scheduling algorithm: a swarm intelligence approach

    NASA Astrophysics Data System (ADS)

    Haghi Kashani, Mostafa; Sarvizadeh, Raheleh; Jameii, Mahdi

    2011-12-01

    The scheduling problem in distributed systems is known as an NP-complete problem, and methods based on heuristic or metaheuristic search have been proposed to obtain optimal and suboptimal solutions. The task scheduling is a key factor for distributed systems to gain better performance. In this paper, an efficient method based on memetic algorithm is developed to solve the problem of distributed systems scheduling. With regard to load balancing efficiently, Artificial Bee Colony (ABC) has been applied as local search in the proposed memetic algorithm. The proposed method has been compared to existing memetic-Based approach in which Learning Automata method has been used as local search. The results demonstrated that the proposed method outperform the above mentioned method in terms of communication cost.

  6. Electric Vehicles Charging Scheduling Strategy Considering the Uncertainty of Photovoltaic Output

    NASA Astrophysics Data System (ADS)

    Wei, Xiangxiang; Su, Su; Yue, Yunli; Wang, Wei; He, Luobin; Li, Hao; Ota, Yutaka

    2017-05-01

    The rapid development of electric vehicles and distributed generation bring new challenges to security and economic operation of the power system, so the collaborative research of the EVs and the distributed generation have important significance in distribution network. Under this background, an EVs charging scheduling strategy considering the uncertainty of photovoltaic(PV) output is proposed. The characteristics of EVs charging are analysed first. A PV output prediction method is proposed with a PV database then. On this basis, an EVs charging scheduling strategy is proposed with the goal to satisfy EVs users’ charging willingness and decrease the power loss in distribution network. The case study proves that the proposed PV output prediction method can predict the PV output accurately and the EVs charging scheduling strategy can reduce the power loss and stabilize the fluctuation of the load in distributed network.

  7. Technicians prepare the AIM spacecraft for fairing installation

    NASA Image and Video Library

    2007-04-12

    At Vandenberg Air Force Base in California, technicians prepare the AIM spacecraft for fairing installation. The fairing is a molded structure that fits around the spacecraft and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch. Launch will be from a Pegasus XL rocket, carried and released by Orbital Sciences L-1011 jet aircraft. AIM, which stands for Aeronomy of Ice in the Mesosphere, is being prepared for integrated testing and a flight simulation. The AIM spacecraft will fly three instruments designed to study polar mesospheric clouds located at the edge of space, 50 miles above the Earth's surface in the coldest part of the planet's atmosphere. The mission's primary goal is to explain why these clouds form and what has caused them to become brighter and more numerous and appear at lower latitudes in recent years. AIM's results will provide the basis for the study of long-term variability in the mesospheric climate and its relationship to global climate change. Launch is scheduled for April 25.

  8. SpaceX TESS Fairing Move

    NASA Image and Video Library

    2018-04-03

    The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is moved inside the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.

  9. SpaceX TESS Fairing Move

    NASA Image and Video Library

    2018-04-03

    The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is being moved to the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.

  10. KSC-02pd0406

    NASA Image and Video Library

    2002-03-01

    VANDENBERG AFB, CALIF. - On the SLC-2 launch pad, the first half of the Delta II fairing for the Aqua-EOS satellite arrives at the gantry. The Delta II will launch the Aqua-EOS satellite. Aqua is one of a series of spacebased platforms that are central to NASA's Earth Science Enterprise (ESE), a long-term study of the scope, dynamics and implications of global change. The Aqua program is composed of Aqua and other spacecraft (including Terra and Aura) and a data distribution system (ESDIS, and Mission Operations Center Implementation Team). Flying in an orbit that covers the globe every 16 days, Aqua will provide a six-year chronology of the planet and its processes. Comprehensive measurements taken by its onboard instruments will allow multidisciplinary teams of scientists and researchers from North and South America, Asia, Australia and Europe to assess long-term change, identify its human and natural causes and advance the development of models for long-term forecasting. Launch is scheduled for April 26 from Vandenberg

  11. KSC-02pd0408

    NASA Image and Video Library

    2002-03-01

    VANDENBERG AFB, CALIF. - On the SLC-2 launch pad, the first half of the Delta II fairing for the Aqua-EOS satellite nears the top of the gantry. The Delta II will launch the Aqua-EOS satellite, one of a series of spacebased platforms that are central to NASA's Earth Science Enterprise (ESE), a long-term study of the scope, dynamics and implications of global change. The Aqua program is composed of Aqua and other spacecraft (including Terra and Aura) and a data distribution system (ESDIS, and Mission Operations Center Implementation Team). Flying in an orbit that covers the globe every 16 days, Aqua will provide a six-year chronology of the planet and its processes. Comprehensive measurements taken by its onboard instruments will allow multidisciplinary teams of scientists and researchers from North and South America, Asia, Australia and Europe to assess long-term change, identify its human and natural causes and advance the development of models for long-term forecasting. Launch is scheduled for April 26 from Vandenberg

  12. TDRS-L Media Day

    NASA Image and Video Library

    2014-01-03

    TITUSVILLE, Fla. – Members of the news media are given an up-close look at the Tracking and Data Relay Satellite, or TDRS-L, spacecraft undergoing preflight processing inside the Astrotech payload processing facility in Titusville. TDRS-L is being prepared for encapsulation inside its payload fairing prior to being transported to Launch Complex 41 at Cape Canaveral Air Force Station. Journalists visited Astrotech as part of TDRS-L Media Day to conduct interviews and photograph the satellite that will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  13. KSC-2014-3020

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The task is taking place prior to encapsulation in its payload fairing atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  14. KSC-2014-3005

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The task is taking place prior to encapsulation in its payload fairing atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  15. KSC-2014-2991

    NASA Image and Video Library

    2014-06-16

    VANDENBERG AIR FORCE BASE, Calif. – Technicians clean some of the hardware for NASA's Orbiting Carbon Observatory-2 mission, or OCO-2, in the Astrotech Payload Processing Facility on Vandenberg Air Force Base in California. The spacecraft soon will be transported to Space Launch Complex 2 for encapsulation in the Delta II payload fairing. Launch aboard a United Launch Alliance Delta II rocket is scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  16. KSC-2014-3018

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The task is taking place prior to encapsulation in its payload fairing atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  17. KSC-2014-2992

    NASA Image and Video Library

    2014-06-16

    VANDENBERG AIR FORCE BASE, Calif. – Technicians clean some of the hardware for NASA's Orbiting Carbon Observatory-2 mission, or OCO-2, in the Astrotech Payload Processing Facility on Vandenberg Air Force Base in California to ensure that the spacecraft is not contaminated prior to its transport to Space Launch Complex 2 for enclosure in the Delta II payload fairing. Launch aboard a United Launch Alliance Delta II rocket is scheduled for 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/30th Space Wing, U.S. Air Force

  18. KSC-2014-3008

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The task is taking place prior to encapsulation in its payload fairing atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  19. KSC-2014-3009

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The task is taking place prior to encapsulation in its payload fairing atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  20. KSC-2014-3019

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The task is taking place prior to encapsulation in its payload fairing atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  1. KSC-2014-3006

    NASA Image and Video Library

    2014-06-20

    VANDENBERG AIR FORCE BASE, Calif. – In the mobile service tower at Space Launch Complex 2 at Vandenberg Air Force Base in California, technicians are inspecting the NASA's Orbiting Carbon Observatory-2, or OCO-2, satellite. The task is taking place prior to encapsulation in its payload fairing atop a United Launch Alliance Delta II rocket. Launch is scheduled for 2:56 a.m. PDT 5:56 a.m. EDT on July 1. OCO-2 is NASA’s first mission dedicated to studying atmospheric carbon dioxide, the leading human-produced greenhouse gas driving changes in Earth’s climate. OCO-2 will provide a new tool for understanding the human and natural sources of carbon dioxide emissions and the natural "sinks" that absorb carbon dioxide and help control its buildup. The observatory will measure the global geographic distribution of these sources and sinks and study their changes over time. To learn more about OCO-2, visit http://oco.jpl.nasa.gov Photo credit: NASA/Mark Mackley

  2. KSC-2009-1410

    NASA Image and Video Library

    2009-01-27

    VANDENBERG AIR FORCE BASE, Calif. -- The first half of the fairing is moved into place around the NOAA-N Prime spacecraft in the launch service tower on Space Launch Complex 2 at Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. NOAA-N Prime is the latest polar-orbiting operational environmental weather satellite developed by NASA for the National Oceanic and Atmospheric Administration. It is built by Lockheed Martin and similar to NOAA-N that was launched on May 20, 2005. Launch of NOAA-N Prime aboard a Delta II rocket is scheduled for Feb. 4. Photo credit: NASA

  3. KSC-2009-1411

    NASA Image and Video Library

    2009-01-27

    VANDENBERG AIR FORCE BASE, Calif. -- The first half of the fairing is moved into place around the NOAA-N Prime spacecraft in the launch service tower on Space Launch Complex 2 at Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. NOAA-N Prime is the latest polar-orbiting operational environmental weather satellite developed by NASA for the National Oceanic and Atmospheric Administration. It is built by Lockheed Martin and similar to NOAA-N that was launched on May 20, 2005. Launch of NOAA-N Prime aboard a Delta II rocket is scheduled for Feb. 4. Photo credit: NASA

  4. KSC-2009-1409

    NASA Image and Video Library

    2009-01-27

    VANDENBERG AIR FORCE BASE, Calif. -- The first half of the fairing is moved into place around the NOAA-N Prime spacecraft in the launch service tower on Space Launch Complex 2 at Vandenberg Air Force Base in California. The fairing is a molded structure that fits flush with the outside surface of the rocket and forms an aerodynamically smooth nose cone, protecting the spacecraft during launch and ascent. NOAA-N Prime is the latest polar-orbiting operational environmental weather satellite developed by NASA for the National Oceanic and Atmospheric Administration. It is built by Lockheed Martin and similar to NOAA-N that was launched on May 20, 2005. Launch of NOAA-N Prime aboard a Delta II rocket is scheduled for Feb. 4. Photo credit: NASA

  5. KSC-99pp0720

    NASA Image and Video Library

    1999-06-19

    A worker in the launch tower at Launch Pad 17A, Cape Canaveral Air Station, watches as the first segment of the fairing is maneuvered around NASA's Far Ultraviolet Spectroscopic Explorer (FUSE) satellite. The satellite is scheduled for launch June 24 aboard a Boeing Delta II rocket. At the lower left in the photo can be seen a camera installed on the second stage of the rocket to record the separation of the fairing several minutes after launch. FUSE is designed to scour the cosmos for the fossil record of the origins of the universe hydrogen and deuterium. Scientists will use FUSE to study those elements to unlock the secrets of how galaxies evolve and to discover what the Universe was like when it was only a few minutes old

  6. KSC-99pp0721

    NASA Image and Video Library

    1999-06-19

    Workers in the launch tower at Launch Pad 17A, Cape Canaveral Air Station, help guide the first segment of the fairing around NASA's Far Ultraviolet Spectroscopic Explorer (FUSE) satellite. The satellite is scheduled for launch June 24 aboard a Boeing Delta II rocket. At the lower left can be seen a camera installed on the second stage of the rocket to record the separation of the fairing several minutes after launch. FUSE is designed to scour the cosmos for the fossil record of the origins of the universe hydrogen and deuterium. Scientists will use FUSE to study those elements to unlock the secrets of how galaxies evolve and to discover what the Universe was like when it was only a few minutes old

  7. KSC-2010-4407

    NASA Image and Video Library

    2010-08-17

    VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, one half of the fairing that will envelop NASA's Glory satellite is moved into a protected environment of VAFB's payload processing facility. Both halves of the fairing will be installed around the spacecraft to protect it from the weather on the ground as well as from the atmosphere during flight. A four-stage Taurus XL rocket will carry Glory into low Earth orbit. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 2:09 a.m. PST Nov. 22. For information, visit www.nasa.gov/glory. Photo credit: NASA/Randy Beaudoin, VAFB

  8. KSC-2010-4408

    NASA Image and Video Library

    2010-08-17

    VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, one half of the fairing that will envelop NASA's Glory satellite is surrounded by protective sheathing in VAFB's payload processing facility. Both halves of the fairing will be installed around the spacecraft to protect it from the weather on the ground as well as from the atmosphere during flight. A four-stage Taurus XL rocket will carry Glory into low Earth orbit. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 2:09 a.m. PST Nov. 22. For information, visit www.nasa.gov/glory. Photo credit: NASA/Randy Beaudoin, VAFB

  9. KSC-05PD-1784

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Workers in the Payload Hazardous Servicing Facility make adjustments as they get ready to move the second half of the fairing (right) and install it with the first half around the Mars Reconnaissance Orbiter. The fairing protects the spacecraft during launch and flight through the atmosphere. Once in space, it is jettisoned. Launch of the MRO aboard an Atlas V rocket will be from Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The MRO is the next major step in Mars exploration and scheduled for launch from Cape Canaveral Air Force Station in a window opening Aug. 10. The MRO is an important next step in fulfilling NASAs vision of space exploration and ultimately sending human explorers to Mars and beyond.

  10. An Examination of Distributive and Relational Justice in the Issue of Education Fairness for Urban Migrant Workers' Children

    ERIC Educational Resources Information Center

    Yun, Luo; Jingxun, Zhong; Rongguang, Zeng

    2017-01-01

    Current arguments on educational fairness for the children of migrant workers in cities primarily promote the opportunity to enroll in local public schools. Drawing on current research, as well as discussions of fairness and justice from Aristotle in the classical period to Rawls, Dworkin, Walzer, and the contemporary scholar Young, we investigate…

  11. Fair sharing of resources in a supply network with constraints.

    PubMed

    Carvalho, Rui; Buzna, Lubos; Just, Wolfram; Helbing, Dirk; Arrowsmith, David K

    2012-04-01

    This paper investigates the effect of network topology on the fair allocation of network resources among a set of agents, an all-important issue for the efficiency of transportation networks all around us. We analyze a generic mechanism that distributes network capacity fairly among existing flow demands. The problem can be solved by semianalytical methods on a nearest-neighbor graph with one source and sink pair, when transport occurs over shortest paths. For this setup, we uncover a broad range of patterns of intersecting shortest paths as a function of the distance between the source and the sink. When the number of intersections is the maximum and the distance between the source and the sink is large, we find that a fair allocation implies a decrease of at least 50% from the maximum throughput. We also find that the histogram of the flow allocations assigned to the agents decays as a power law with exponent -1. Our semianalytical framework suggests possible explanations for the well-known reduction of the throughput in fair allocations. It also suggests that the combination of network topology and routing rules can lead to highly uneven (but fair) distributions of resources, a remark of caution to network designers.

  12. Fair sharing of resources in a supply network with constraints

    NASA Astrophysics Data System (ADS)

    Carvalho, Rui; Buzna, Lubos; Just, Wolfram; Helbing, Dirk; Arrowsmith, David K.

    2012-04-01

    This paper investigates the effect of network topology on the fair allocation of network resources among a set of agents, an all-important issue for the efficiency of transportation networks all around us. We analyze a generic mechanism that distributes network capacity fairly among existing flow demands. The problem can be solved by semianalytical methods on a nearest-neighbor graph with one source and sink pair, when transport occurs over shortest paths. For this setup, we uncover a broad range of patterns of intersecting shortest paths as a function of the distance between the source and the sink. When the number of intersections is the maximum and the distance between the source and the sink is large, we find that a fair allocation implies a decrease of at least 50% from the maximum throughput. We also find that the histogram of the flow allocations assigned to the agents decays as a power law with exponent -1. Our semianalytical framework suggests possible explanations for the well-known reduction of the throughput in fair allocations. It also suggests that the combination of network topology and routing rules can lead to highly uneven (but fair) distributions of resources, a remark of caution to network designers.

  13. A distributed scheduling algorithm for heterogeneous real-time systems

    NASA Technical Reports Server (NTRS)

    Zeineldine, Osman; El-Toweissy, Mohamed; Mukkamala, Ravi

    1991-01-01

    Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

  14. Measuring the effects of heterogeneity on distributed systems

    NASA Technical Reports Server (NTRS)

    El-Toweissy, Mohamed; Zeineldine, Osman; Mukkamala, Ravi

    1991-01-01

    Distributed computer systems in daily use are becoming more and more heterogeneous. Currently, much of the design and analysis studies of such systems assume homogeneity. This assumption of homogeneity has been mainly driven by the resulting simplicity in modeling and analysis. A simulation study is presented which investigated the effects of heterogeneity on scheduling algorithms for hard real time distributed systems. In contrast to previous results which indicate that random scheduling may be as good as a more complex scheduler, this algorithm is shown to be consistently better than a random scheduler. This conclusion is more prevalent at high workloads as well as at high levels of heterogeneity.

  15. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2004-01-01

    Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

  16. A Scheduling Algorithm for the Distributed Student Registration System in Transaction-Intensive Environment

    ERIC Educational Resources Information Center

    Li, Wenhao

    2011-01-01

    Distributed workflow technology has been widely used in modern education and e-business systems. Distributed web applications have shown cross-domain and cooperative characteristics to meet the need of current distributed workflow applications. In this paper, the author proposes a dynamic and adaptive scheduling algorithm PCSA (Pre-Calculated…

  17. Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft

    NASA Technical Reports Server (NTRS)

    Kleiner, Steven C.

    1998-01-01

    This 2-year report describes the progress made to date on the project to package and distribute the planning and scheduling toolkit for the SWAS astronomical spacecraft. SWAS was scheduled to be launched on a Pegasus XL vehicle in fall 1995. Three separate failures in the launch vehicle have delayed the SWAS launch. The researchers have used this time to continue developing scheduling algorithms and GUI design. SWAS is expected to be launched this year.

  18. Distributed practice. The more the merrier? A randomised bronchoscopy simulation study.

    PubMed

    Bjerrum, Anne Sofie; Eika, Berit; Charles, Peder; Hilberg, Ole

    2016-01-01

    The distribution of practice affects the acquisition of skills. Distributed practice has shown to be more effective for skills acquisition than massed training. However, it remains unknown as to which is the most effective distributed practice schedule for learning bronchoscopy skills through simulation training. This study compares two distributed practice schedules: One-day distributed practice and weekly distributed practice. Twenty physicians in training were randomly assigned to one-day distributed or weekly distributed bronchoscopy simulation practice. Performance was assessed with a pre-test, a post-test after each practice session, and a 4-week retention test using previously validated simulator measures. Data were analysed with repeated measures ANOVA. No interaction was found between group and test (F(4,72) <1.68, p>0.16), except for the measure 'percent-segments-entered', and no main effect of group was found for any of the measures (F(1,72)< 0.87, p>0.36), which indicates that there was no difference between the learning curves of the one-day distributed practice schedule and the weekly distributed practice schedule. We found no difference in effectiveness of bronchoscopy skills acquisition between the one-day distributed practice and the weekly distributed practice. This finding suggests that the choice of bronchoscopy training practice may be guided by what best suits the clinical practice.

  19. 26 CFR 1.367(e)-2 - Distributions described in section 367(e)(2).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... paragraphs (c)(1) and (2) of this section. Paragraph (d) of this section contains an anti-abuse rule. Finally... capital assets: Asset A, which has a fair market value of $100 and an adjusted basis of $40; Asset B, which has a fair market value of $60 and an adjusted basis of $80; and, Asset C, which has a fair market...

  20. 26 CFR 1.367(e)-2 - Distributions described in section 367(e)(2).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... paragraphs (c)(1) and (2) of this section. Paragraph (d) of this section contains an anti-abuse rule. Finally... capital assets: Asset A, which has a fair market value of $100 and an adjusted basis of $40; Asset B, which has a fair market value of $60 and an adjusted basis of $80; and, Asset C, which has a fair market...

  1. 26 CFR 1.367(e)-2 - Distributions described in section 367(e)(2).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... paragraphs (c)(1) and (2) of this section. Paragraph (d) of this section contains an anti-abuse rule. Finally... capital assets: Asset A, which has a fair market value of $100 and an adjusted basis of $40; Asset B, which has a fair market value of $60 and an adjusted basis of $80; and, Asset C, which has a fair market...

  2. 26 CFR 1.367(e)-2 - Distributions described in section 367(e)(2).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... paragraphs (c)(1) and (2) of this section. Paragraph (d) of this section contains an anti-abuse rule. Finally... capital assets: Asset A, which has a fair market value of $100 and an adjusted basis of $40; Asset B, which has a fair market value of $60 and an adjusted basis of $80; and, Asset C, which has a fair market...

  3. A Critical Analysis of Attribute Development Programs for Army Leaders

    DTIC Science & Technology

    2016-06-10

    40 Col. Brian Michelon, “Character Development of U.S. Army Leaders: The Laissez - Faire Approach,” Military Review (2013...Accessed January 1, 2016. https://hbr.org/2001/12/what-leaders-really-do. Michelon, Brian. “Character Development of U.S. Army Leaders: The Laissez - Faire ...Leavenworth, Kansas 2016 Approved for public release; distribution is unlimited. Fair use determination or copyright permission has been obtained

  4. A phase I and pharmacologic study of sequences of the proteasome inhibitor, bortezomib (PS-341, Velcade), in combination with paclitaxel and carboplatin in patients with advanced malignancies.

    PubMed

    Ma, Cynthia; Mandrekar, Sumithra J; Alberts, Steven R; Croghan, Gary A; Jatoi, Aminah; Reid, Joel M; Hanson, Lorelei J; Bruzek, Laura; Tan, Angelina D; Pitot, Henry C; Erlichman, Charles; Wright, John J; Adjei, Alex A

    2007-02-01

    Bortezomib, a selective inhibitor of the 20S proteasome with activity in a variety of cancers, exhibits sequence-dependent synergistic cytotoxicity with taxanes and platinum agents. Two different treatment schedules of bortezomib in combination with paclitaxel and carboplatin were tested in this phase I study to evaluate the effects of scheduling on toxicities, pharmacodynamics and clinical activity. Patients with advanced malignancies were alternately assigned to receive (schedule A) paclitaxel and carboplatin (IV d1) followed by bortezomib (IV d2, d5, d8) or (schedule B) bortezomib (IV d1, d4, d8) followed by paclitaxel and carboplatin (IV d2) on a 21-day cycle. Fifty-three patients (A 25, B 28) were treated with a median of 3 cycles (range 1-8) for schedule A and 3.5 cycles (range 1-10) for schedule B. Grade 3 or higher treatment related hematologic adverse events in all cycles of treatment included neutropenia (A 52%, B 50%), anemia (A 12%, B 7.1%) and thrombocytopenia (A 16%, B 17.9%). Non-hematologic treatment related adverse events were fairly mild (primarily grades 1 and 2). The maximum tolerated dose and the recommended doses for future phase II trials are bortezomib 1.2 mg/m2, paclitaxel 135 mg/m2 and carboplatin AUC = 6 for schedule A and bortezomib 1.2 mg/m2, paclitaxel 175 mg/m2 and carboplatin AUC = 6 for schedule B. Six (21.4%) partial responses (PR) were seen with schedule B. In contrast, only 1 (4%) PR was achieved with schedule A. Similar proteasome inhibition was achieved at MTD for both schedules. Administration of sequential bortezomib followed by chemotherapy (schedule B) was well tolerated and associated with an encouraging number of objective responses in this small group of patients. Further studies with this administration schedule are warranted.

  5. FALCON: A distributed scheduler for MIMD architectures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grimshaw, A.S.; Vivas, V.E. Jr.

    1991-01-01

    This paper describes FALCON (Fully Automatic Load COordinator for Networks), the scheduler for the Mentat parallel processing system. FALCON has a modular structure and is designed for systems that use a task scheduling mechanism. FALCON is distributed, stable, supports system heterogeneities, and employs a sender-initiated adaptive load sharing policy with static task assignment. FALCON is parameterizable and is implemented in Mentat, a working distributed system. We present the design and implementation of FALCON as well as a brief introduction to those features of the Mentat run-time system that influence FALCON. Performance measures under different scheduler configurations are also presented andmore » analyzed with respect to the system parameters. 36 refs., 8 figs.« less

  6. Stabilization process of human population: a descriptive approach.

    PubMed

    Kayani, A K; Krotki, K J

    1981-01-01

    An attempt is made to inquire into the process of stabilization of a human population. The same age distribution distorted by past variations in fertility is subjected to several fixed schedules of fertility. The schedules are different from each other monotonically over a narrow range. The primary concern is with the process, almost year by year, through which the populations become stable. There is particular interest in the differential impact in the same original age distribution of the narrowly different fixed fertility schedules. The exercise is prepared in 3 stages: general background of the process of stabilization; methodology and data used; and analysis and discussion of the stabilization process. Among the several approaches through which the analysis of stable population is possible, 2 are popular: the integral equation and the projection matrix. In this presentation the interest is in evaluating the effects of fertility on the stabilization process of a population. Therefore, only 1 initial age distribution and only 1 life table but a variety of narrowly different schedules of fertility have been used. Specifically, the U.S. 1963 female population is treated as the initial population. The process of stabilization is viewed in the light of the changes in the slopes between 2 successive age groups of an age distribution. A high fertility schedule with the given initial age distribution and mortality level overcomes the oscillations more quickly than the low fertility schedule. Simulation confirms the intuitively expected positive relationship between the mean of the slope and the level of fertility. The variance of the slope distribution is an indicator of the aging of the distribution.

  7. Distributed Processor/Memory Architectures Design Program

    DTIC Science & Technology

    1975-02-01

    Event Scheduling Plo 31 Globat LAl Message Input Event Sicheduling Fhou ..... ............... 106 32 It tc Iata Representation...298 138 GEX LEX Scheduling Phlmophy ....... ...................... 300 139 Executive Comirol Herarchy... Scheduler Subroutine lnterrelatiomhips . ..... ................. 312 145 Task Scheduler Message Scatuer. . ...... ....................... 315 146

  8. 25 CFR 142.7 - How are transportation and scheduling determined?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... advantage of economies of scale and consider geographic disparity and distribution of sites. (b) Itineraries... shipping season the final departure and arrival schedules must be distributed prior to the commencement of...

  9. Psychometric properties of the Aberrant Behavior Checklist, the Anxiety, Depression and Mood Scale, the Assessment of Dual Diagnosis and the Social Performance Survey Schedule in adults with intellectual disabilities.

    PubMed

    Rojahn, Johannes; Rowe, Ellen W; Kasdan, Shana; Moore, Linda; van Ingen, Daniel J

    2011-01-01

    Progress in clinical research and in empirically supported interventions in the area of psychopathology in intellectual disabilities (ID) depends on high-quality assessment instruments. To this end, psychometric properties of four instruments were examined: the Aberrant Behavior Checklist (ABC), the Assessment of Dual Diagnosis (ADD), the Anxiety, Depression and Mood Scale (ADAMS), and the Social Performance Survey Schedule (SPSS). Data were collected in two community-based groups of adults with mild to profound ID (n = 263). Subscale reliability (internal consistency) ranged from fair to excellent for the ABC, the ADAMS, and the SPSS (mean coefficient α across ABC subscales was .87 (ranging from fair to excellent), the ADAMS subscales .83 (ranging from fair to good), and the SPSS subscales .91 (range from good to excellent). The ADD subscales had generally lower reliability scores with a mean of .59 (ranging from unacceptable to good). Convergent and discriminant validity was determined by bivariate Spearman ρ correlations between subscales of one instrument and the subscales of the other three instruments. For the most part, all four instruments showed solid convergent and discriminant validity. To examine the factorial validity, Confirmatory Factor Analyses (CFA) were attempted with the inter-item covariance matrix of each instrument. Generally, the data did not show good fits with the measurement models for the SPSS, ABC, or the ADAMS (CFA analyses with the ADD would not converge). However, most of the items on these three instruments had significant loadings on their respective factors. Copyright © 2011 Elsevier Ltd. All rights reserved.

  10. The hospital: battleground or meeting place? Ethical considerations regarding a fair distribution of new medical technologies.

    PubMed

    van der Kloot Meijburg, H H

    1995-12-01

    Here, the notion of distributive justice is explored in relation to the introduction and the application of new medical technologies within the clinical setting. The point of departure is that, in the decision making process on what is necessary and fair in patient care, participants will mobilize different ethical models to justify their outlooks and interests. The history of the introduction of Taxol (paclitaxel) is used as an illustration. In the hospital, it is important to make a clear distinction between the moral obligations of the physician and those of the chief executive officer (medical director). Finally, a model is proposed that could help to develop a better moral understanding on the meso-level about what is necessary and fair in distributing the results of medical innovations, without turning the clinic into a battleground of moral interests.

  11. Effectiveness of motor sequential learning according to practice schedules in healthy adults; distributed practice versus massed practice

    PubMed Central

    Kwon, Yong Hyun; Kwon, Jung Won; Lee, Myoung Hee

    2015-01-01

    [Purpose] The purpose of the current study was to compare the effectiveness of motor sequential learning according to two different types of practice schedules, distributed practice schedule (two 12-hour inter-trial intervals) and massed practice schedule (two 10-minute inter-trial intervals) using a serial reaction time (SRT) task. [Subjects and Methods] Thirty healthy subjects were recruited and then randomly and evenly assigned to either the distributed practice group or the massed practice group. All subjects performed three consecutive sessions of the SRT task following one of the two different types of practice schedules. Distributed practice was scheduled for two 12-hour inter-session intervals including sleeping time, whereas massed practice was administered for two 10-minute inter-session intervals. Response time (RT) and response accuracy (RA) were measured in at pre-test, mid-test, and post-test. [Results] For RT, univariate analysis demonstrated significant main effects in the within-group comparison of the three tests as well as the interaction effect of two groups × three tests, whereas the between-group comparison showed no significant effect. The results for RA showed no significant differences in neither the between-group comparison nor the interaction effect of two groups × three tests, whereas the within-group comparison of the three tests showed a significant main effect. [Conclusion] Distributed practice led to enhancement of motor skill acquisition at the first inter-session interval as well as at the second inter-interval the following day, compared to massed practice. Consequentially, the results of this study suggest that a distributed practice schedule can enhance the effectiveness of motor sequential learning in 1-day learning as well as for two days learning formats compared to massed practice. PMID:25931727

  12. Thermal scanner data for studying freeze conditions and for aiding irrigation scheduling

    NASA Technical Reports Server (NTRS)

    Bartholic, J. F.; Wiegand, C. L.; Leamer, R. W.; Namken, L. N.

    1970-01-01

    The use of thermal imagery in connection with plant water stress appears to hold considerable potential, particularly with scanners such as the RS-14 where internal calibration sources can be adjusted to bracket the temperatures of interest. The data from the thermal film are fairly easy to reduce; however, data reduction in 3 days or less would be required before it could be used in irrigation timing.

  13. Expedition 49 Preflight

    NASA Image and Video Library

    2016-10-11

    The Soyuz MS-02 spacecraft is seen as the work platforms around it are retracted in preparation for being encapsulated in its fairing on Thursday, Tuesday, Oct. 11, 2016 at the Baikonur Cosmodrome in Kazakhstan. Expedition 49 flight engineer Shane Kimbrough of NASA, flight engineer Andrey Borisenko of Roscosmos, and Soyuz commander Sergey Ryzhikov of Roscosmos are scheduled to launch from the Baikonur Cosmodrome in Kazakhstan on Oct. 19. Photo Credit: (NASA/Victor Zelentsov)

  14. KSC-11415f07

    NASA Image and Video Library

    1997-09-21

    The Cassini spacecraft awaits placement of its payload fairing at Launch Pad 40 at Cape Canaveral Air Station (CCAS) to protect Cassini during launch. Scheduled for launch in mid-October, the Cassini mission is a joint US-European four-year orbital surveillance of Saturn's atmosphere and magnetosphere, its rings, and its moons, seeks insight into the origins and evolution of the early solar system. NASA’s Jet Propulsion Laboratory is managing the Cassini project

  15. KSC-11415f06

    NASA Image and Video Library

    1997-09-21

    The Cassini spacecraft awaits placement of its payload fairing at Launch Pad 40 at Cape Canaveral Air Station (CCAS) to protect Cassini during launch. Scheduled for launch in mid-October, the Cassini mission is a joint US-European four-year orbital surveillance of Saturn's atmosphere and magnetosphere, its rings, and its moons, seeks insight into the origins and evolution of the early solar system. NASA’s Jet Propulsion Laboratory is managing the Cassini project

  16. Distributed practice. The more the merrier? A randomised bronchoscopy simulation study

    PubMed Central

    Bjerrum, Anne Sofie; Eika, Berit; Charles, Peder; Hilberg, Ole

    2016-01-01

    Introduction The distribution of practice affects the acquisition of skills. Distributed practice has shown to be more effective for skills acquisition than massed training. However, it remains unknown as to which is the most effective distributed practice schedule for learning bronchoscopy skills through simulation training. This study compares two distributed practice schedules: One-day distributed practice and weekly distributed practice. Method Twenty physicians in training were randomly assigned to one-day distributed or weekly distributed bronchoscopy simulation practice. Performance was assessed with a pre-test, a post-test after each practice session, and a 4-week retention test using previously validated simulator measures. Data were analysed with repeated measures ANOVA. Results No interaction was found between group and test (F(4,72) <1.68, p>0.16), except for the measure ‘percent-segments-entered’, and no main effect of group was found for any of the measures (F(1,72)< 0.87, p>0.36), which indicates that there was no difference between the learning curves of the one-day distributed practice schedule and the weekly distributed practice schedule. Discussion We found no difference in effectiveness of bronchoscopy skills acquisition between the one-day distributed practice and the weekly distributed practice. This finding suggests that the choice of bronchoscopy training practice may be guided by what best suits the clinical practice. PMID:27172423

  17. Distributed practice. The more the merrier? A randomised bronchoscopy simulation study.

    PubMed

    Bjerrum, Anne Sofie; Eika, Berit; Charles, Peder; Hilberg, Ole

    2016-01-01

    Introduction The distribution of practice affects the acquisition of skills. Distributed practice has shown to be more effective for skills acquisition than massed training. However, it remains unknown as to which is the most effective distributed practice schedule for learning bronchoscopy skills through simulation training. This study compares two distributed practice schedules: One-day distributed practice and weekly distributed practice. Method Twenty physicians in training were randomly assigned to one-day distributed or weekly distributed bronchoscopy simulation practice. Performance was assessed with a pre-test, a post-test after each practice session, and a 4-week retention test using previously validated simulator measures. Data were analysed with repeated measures ANOVA. Results No interaction was found between group and test (F(4,72) <1.68, p>0.16), except for the measure 'percent-segments-entered', and no main effect of group was found for any of the measures (F(1,72)< 0.87, p>0.36), which indicates that there was no difference between the learning curves of the one-day distributed practice schedule and the weekly distributed practice schedule. Discussion We found no difference in effectiveness of bronchoscopy skills acquisition between the one-day distributed practice and the weekly distributed practice. This finding suggests that the choice of bronchoscopy training practice may be guided by what best suits the clinical practice.

  18. KENNEDY SPACE CENTER, FLA. - The fairing for the Mars Exploration Rover 2 (MER-2/MER-A) arrives at Launch Complex 17-A, Cape Canaveral Air Force Station. It will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - The fairing for the Mars Exploration Rover 2 (MER-2/MER-A) arrives at Launch Complex 17-A, Cape Canaveral Air Force Station. It will be installed around the payload for protection during launch. The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for MER-A is scheduled for June 5.

  19. KSC-2011-1117

    NASA Image and Video Library

    2011-01-12

    VANDENBERG AIR FORCE BASE, Calif. -- Inside the Astrotech processing facility at Vandenberg Air Force Base in California, technicians prepare to transfer NASA's Glory spacecraft to a processing dolly. Next, technicians will take off Glory's protective covering before it is encapsulated in a protective payload fairing for flight. In early February, Glory is scheduled to be transported Space Launch Complex 576-E where it will be joined with the Taurus XL rocket, which is manufactured by Orbital Sciences Corp. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  20. KSC-2011-1114

    NASA Image and Video Library

    2011-01-12

    VANDENBERG AIR FORCE BASE, Calif. -- Inside the Astrotech processing facility at Vandenberg Air Force Base in California, technicians prepare to remove the shipping container surrounding NASA's Glory spacecraft. Next, technicians will take off Glory's protective covering before it is encapsulated in a protective payload fairing for flight. In early February, Glory is scheduled to be transported Space Launch Complex 576-E where it will be joined with the Taurus XL rocket, which is manufactured by Orbital Sciences Corp. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  1. KSC-2011-1118

    NASA Image and Video Library

    2011-01-12

    VANDENBERG AIR FORCE BASE, Calif. -- Inside the Astrotech processing facility at Vandenberg Air Force Base in California, NASA's Glory spacecraft is transferring to a processing dolly. Next, technicians will take off Glory's protective covering before it is encapsulated in a protective payload fairing for flight. In early February, Glory is scheduled to be transported Space Launch Complex 576-E where it will be joined with the Taurus XL rocket, which is manufactured by Orbital Sciences Corp. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  2. KSC-2011-1113

    NASA Image and Video Library

    2011-01-12

    VANDENBERG AIR FORCE BASE, Calif. -- Inside the Astrotech processing facility at Vandenberg Air Force Base in California, the shipping container surrounding NASA's Glory spacecraft is ready for removal. Next, technicians will take off Glory's protective covering before it is encapsulated in a protective payload fairing for flight. In early February, Glory is scheduled to be transported Space Launch Complex 576-E where it will be joined with the Taurus XL rocket, which is manufactured by Orbital Sciences Corp. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  3. KSC-2011-1115

    NASA Image and Video Library

    2011-01-12

    VANDENBERG AIR FORCE BASE, Calif. -- Inside the Astrotech processing facility at Vandenberg Air Force Base in California, technicians remove the shipping container surrounding NASA's Glory spacecraft. Next, technicians will take off Glory's protective covering before it is encapsulated in a protective payload fairing for flight. In early February, Glory is scheduled to be transported Space Launch Complex 576-E where it will be joined with the Taurus XL rocket, which is manufactured by Orbital Sciences Corp. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  4. KSC-2011-1119

    NASA Image and Video Library

    2011-01-12

    VANDENBERG AIR FORCE BASE, Calif. -- Inside the Astrotech processing facility at Vandenberg Air Force Base in California, NASA's Glory spacecraft is situated on a dolly and ready for processing. Next, technicians will take off Glory's protective covering before it is encapsulated in a protective payload fairing for flight. In early February, Glory is scheduled to be transported Space Launch Complex 576-E where it will be joined with the Taurus XL rocket, which is manufactured by Orbital Sciences Corp. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  5. KSC-2011-1116

    NASA Image and Video Library

    2011-01-12

    VANDENBERG AIR FORCE BASE, Calif. -- Inside the Astrotech processing facility at Vandenberg Air Force Base in California, technicians remove the shipping container surrounding NASA's Glory spacecraft. Next, technicians will take off Glory's protective covering before it is encapsulated in a protective payload fairing for flight. In early February, Glory is scheduled to be transported Space Launch Complex 576-E where it will be joined with the Taurus XL rocket, which is manufactured by Orbital Sciences Corp. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 5:09 a.m. EST Feb. 23. For information, visit www.nasa.gov/glory. Photo credit: NASA/Ed Henry, VAFB

  6. The Effect of the Use of Outside Facilities and Resources on Success in Secondary School Science Fairs.

    ERIC Educational Resources Information Center

    Wiygul, Sherrill M.; Gifford, Vernon

    To investigate the effect of outside help in executing a successful science fair project, surveys were distributed to 356 participants in the 1987 Mississippi Region V Science Fair. Of this number, 147 students were in grades 7 and 8, 136 in grades 9 and 10, and 73 in grades 11 and 12. Students listed the number of hours they spent using outside…

  7. Hazardous Waste Cleanup: Fisher Scientific Chemical Division in Fair Lawn, New Jersey

    EPA Pesticide Factsheets

    Fisher Scientific Chemical Division occupies a 10-acre site at 1 Reagent Lane in the Fair Lawn Industrial Park, New Jersey. Since 1955, Fisher has formulated, distilled, repackaged and distributed high-purity, laboratory-grade reagents and solvents.

  8. Taming Wild Horses: The Need for Virtual Time-based Scheduling of VMs in Network Simulations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoginath, Srikanth B; Perumalla, Kalyan S; Henz, Brian J

    2012-01-01

    The next generation of scalable network simulators employ virtual machines (VMs) to act as high-fidelity models of traffic producer/consumer nodes in simulated networks. However, network simulations could be inaccurate if VMs are not scheduled according to virtual time, especially when many VMs are hosted per simulator core in a multi-core simulator environment. Since VMs are by default free-running, on the outset, it is not clear if, and to what extent, their untamed execution affects the results in simulated scenarios. Here, we provide the first quantitative basis for establishing the need for generalized virtual time scheduling of VMs in network simulators,more » based on an actual prototyped implementations. To exercise breadth, our system is tested with multiple disparate applications: (a) a set of message passing parallel programs, (b) a computer worm propagation phenomenon, and (c) a mobile ad-hoc wireless network simulation. We define and use error metrics and benchmarks in scaled tests to empirically report the poor match of traditional, fairness-based VM scheduling to VM-based network simulation, and also clearly show the better performance of our simulation-specific scheduler, with up to 64 VMs hosted on a 12-core simulator node.« less

  9. Investigation of Inter-Node B Macro Diversity for Single-Carrier Based Radio Access in Evolved UTRA Uplink

    NASA Astrophysics Data System (ADS)

    Kawai, Hiroyuki; Morimoto, Akihito; Higuchi, Kenichi; Sawahashi, Mamoru

    This paper investigates the gain of inter-Node B macro diversity for a scheduled-based shared channel using single-carrier FDMA radio access in the Evolved UTRA (UMTS Terrestrial Radio Access) uplink based on system-level simulations. More specifically, we clarify the gain of inter-Node B soft handover (SHO) with selection combining at the radio frame length level (=10msec) compared to that for hard handover (HHO) for a scheduled-based shared data channel, considering the gains of key packet-specific techniques including channel-dependent scheduling, adaptive modulation and coding (AMC), hybrid automatic repeat request (ARQ) with packet combining, and slow transmission power control (TPC). Simulation results show that the inter-Node B SHO increases the user throughput at the cell edge by approximately 10% for a short cell radius such as 100-300m due to the diversity gain from a sudden change in other-cell interference, which is a feature specific to full scheduled-based packet access. However, it is also shown that the gain of inter-Node B SHO compared to that for HHO is small in a macrocell environment when the cell radius is longer than approximately 500m due to the gains from hybrid ARQ with packet combining, slow TPC, and proportional fairness based channel-dependent scheduling.

  10. Enhancing the Selection of Backoff Interval Using Fuzzy Logic over Wireless Ad Hoc Networks

    PubMed Central

    Ranganathan, Radha; Kannan, Kathiravan

    2015-01-01

    IEEE 802.11 is the de facto standard for medium access over wireless ad hoc network. The collision avoidance mechanism (i.e., random binary exponential backoff—BEB) of IEEE 802.11 DCF (distributed coordination function) is inefficient and unfair especially under heavy load. In the literature, many algorithms have been proposed to tune the contention window (CW) size. However, these algorithms make every node select its backoff interval between [0, CW] in a random and uniform manner. This randomness is incorporated to avoid collisions among the nodes. But this random backoff interval can change the optimal order and frequency of channel access among competing nodes which results in unfairness and increased delay. In this paper, we propose an algorithm that schedules the medium access in a fair and effective manner. This algorithm enhances IEEE 802.11 DCF with additional level of contention resolution that prioritizes the contending nodes according to its queue length and waiting time. Each node computes its unique backoff interval using fuzzy logic based on the input parameters collected from contending nodes through overhearing. We evaluate our algorithm against IEEE 802.11, GDCF (gentle distributed coordination function) protocols using ns-2.35 simulator and show that our algorithm achieves good performance. PMID:25879066

  11. A new scheduling algorithm for parallel sparse LU factorization with static pivoting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grigori, Laura; Li, Xiaoye S.

    2002-08-20

    In this paper we present a static scheduling algorithm for parallel sparse LU factorization with static pivoting. The algorithm is divided into mapping and scheduling phases, using the symmetric pruned graphs of L' and U to represent dependencies. The scheduling algorithm is designed for driving the parallel execution of the factorization on a distributed-memory architecture. Experimental results and comparisons with SuperLU{_}DIST are reported after applying this algorithm on real world application matrices on an IBM SP RS/6000 distributed memory machine.

  12. Well-being and fairness in the distribution of scarce health resources.

    PubMed

    Segev, Re'em

    2005-06-01

    Based on a general thesis regarding the proper resolution of interpersonal conflicts, this paper suggests a normative framework for the distribution of scarce health resources. The proposed thesis includes two basic ideas. First, individual well-being is the fundamental value. Second, interpersonal conflicts affecting well-being should be resolved in light of several conceptions of fairness, reflecting the independent value of persons and the moral significance of responsibility of individuals for the existence of interpersonal conflicts. These ideas are elaborated in several principles that are applied with respect to the distribution of scarce health resources.

  13. 48 CFR 552.238-71 - Submission and Distribution of Authorized FSS Schedule Pricelists.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Multiple Award Schedule electronic data base. (d) The Contractor shall make all of the distributions... electronic submission with the award notification. Some structured data entry in a prescribed format may be...

  14. 48 CFR 552.238-71 - Submission and Distribution of Authorized FSS Schedule Pricelists.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Multiple Award Schedule electronic data base. (d) The Contractor shall make all of the distributions... electronic submission with the award notification. Some structured data entry in a prescribed format may be...

  15. 48 CFR 552.238-71 - Submission and Distribution of Authorized FSS Schedule Pricelists.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Multiple Award Schedule electronic data base. (d) The Contractor shall make all of the distributions... electronic submission with the award notification. Some structured data entry in a prescribed format may be...

  16. 48 CFR 552.238-71 - Submission and Distribution of Authorized FSS Schedule Pricelists.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Multiple Award Schedule electronic data base. (d) The Contractor shall make all of the distributions... electronic submission with the award notification. Some structured data entry in a prescribed format may be...

  17. 48 CFR 552.238-71 - Submission and Distribution of Authorized FSS Schedule Pricelists.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Multiple Award Schedule electronic data base. (d) The Contractor shall make all of the distributions... electronic submission with the award notification. Some structured data entry in a prescribed format may be...

  18. Optimum electric utility spot price determinations for small power producing facilities operating under PURPA provisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghoudjehbaklou, H.; Puttgen, H.B.

    This paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility strives to use spot prices which maximize itsmore » revenues from any given Small Power Producing Facility, SPPF, a schedule while respecting the general regulatory and contractual framework. the proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less

  19. Optimum electric utility spot price determinations for small power producing facilities operating under PURPA provisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghoudjehbaklou, H.; Puttgen, H.B.

    The present paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility will strive to use spot prices whichmore » maximize its revenues from any given Small Power Producing Facility, SPPF, schedule while respecting the general regulatory and contractual framework. The proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less

  20. A self-organizing neural network for job scheduling in distributed systems

    NASA Astrophysics Data System (ADS)

    Newman, Harvey B.; Legrand, Iosif C.

    2001-08-01

    The aim of this work is to describe a possible approach for the optimization of the job scheduling in large distributed systems, based on a self-organizing Neural Network. This dynamic scheduling system should be seen as adaptive middle layer software, aware of current available resources and making the scheduling decisions using the "past experience." It aims to optimize job specific parameters as well as the resource utilization. The scheduling system is able to dynamically learn and cluster information in a large dimensional parameter space and at the same time to explore new regions in the parameters space. This self-organizing scheduling system may offer a possible solution to provide an effective use of resources for the off-line data processing jobs for future HEP experiments.

  1. Randomness in Competitions

    NASA Astrophysics Data System (ADS)

    Ben-Naim, E.; Hengartner, N. W.; Redner, S.; Vazquez, F.

    2013-05-01

    We study the effects of randomness on competitions based on an elementary random process in which there is a finite probability that a weaker team upsets a stronger team. We apply this model to sports leagues and sports tournaments, and compare the theoretical results with empirical data. Our model shows that single-elimination tournaments are efficient but unfair: the number of games is proportional to the number of teams N, but the probability that the weakest team wins decays only algebraically with N. In contrast, leagues, where every team plays every other team, are fair but inefficient: the top √{N} of teams remain in contention for the championship, while the probability that the weakest team becomes champion is exponentially small. We also propose a gradual elimination schedule that consists of a preliminary round and a championship round. Initially, teams play a small number of preliminary games, and subsequently, a few teams qualify for the championship round. This algorithm is fair and efficient: the best team wins with a high probability and the number of games scales as N 9/5, whereas traditional leagues require N 3 games to fairly determine a champion.

  2. SpaceX TESS Fairing Move

    NASA Image and Video Library

    2018-04-03

    The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is moved to the entrance of the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.

  3. SpaceX TESS Fairing Move

    NASA Image and Video Library

    2018-04-03

    The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is being prepared for the move to the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.

  4. TESS SpaceX Payload Fairing Move to PHSF

    NASA Image and Video Library

    2018-04-03

    The payload fairing for NASA's Transiting Exoplanet Survey Satellite (TESS) is moved to the entrance of the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. Inside the facility, TESS will be encapsulated in the payload fairing. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.

  5. An ant colony optimization heuristic for an integrated production and distribution scheduling problem

    NASA Astrophysics Data System (ADS)

    Chang, Yung-Chia; Li, Vincent C.; Chiang, Chia-Ju

    2014-04-01

    Make-to-order or direct-order business models that require close interaction between production and distribution activities have been adopted by many enterprises in order to be competitive in demanding markets. This article considers an integrated production and distribution scheduling problem in which jobs are first processed by one of the unrelated parallel machines and then distributed to corresponding customers by capacitated vehicles without intermediate inventory. The objective is to find a joint production and distribution schedule so that the weighted sum of total weighted job delivery time and the total distribution cost is minimized. This article presents a mathematical model for describing the problem and designs an algorithm using ant colony optimization. Computational experiments illustrate that the algorithm developed is capable of generating near-optimal solutions. The computational results also demonstrate the value of integrating production and distribution in the model for the studied problem.

  6. Distribution of hospital beds in Tehran Province based on Gini coefficient and Lorenz curve from 2010 to 2012.

    PubMed

    Asl, Iravan Masoudi; Abolhallaje, Masoud; Raadabadi, Mehdi; Nazari, Hamed; Nazari, Aslan; Salimi, Mohammad; Javani, Ali

    2015-12-01

    Fair distribution of hospital beds across various regions is a controversial subject. Resource allocation in health systems rarely has focused on those who need it most and, in addition, is often influenced by political interests. The study assesses the distribution of hospital beds in different regions in Tehran, Iran, during 2010-2012. This cross-sectional study was conducted in all regions of Tehran (22 regions) during 2010 to 2012. All hospital beds in these regions are included in the study. Data regarding populations of each region were obtained from the Statistics Center of Iran. According to the data, the total number of beds (N.B) and population (P) in 2010 (N.B=19075, P= 7585000), 2011 (N.B=21632, P= 9860500), and 2012 (N.B=21808, P=12818650). The instrument was a form, including the name of the hospital, the district in which the hospital was located, the number of staffed beds, the name of each region, and its population. Data analysis was performed using DASP software version 2.3. The results demonstrate that the Gini coefficient of distributed beds in 22 regions of Tehran was 0.46 in all three years and specifically calculated 0.4666 in 2010, 0.4658 in 2011 and 0.4652 in 2012. The Gini coefficient of beds in 22 regions of Tehran is not fair in comparison with the population of each region during the years 2010 to 2012. The results demonstrate that the distribution of beds in regions in Tehran is not fair in relation to the population of each region-and some regions had no hospitals. Therefore, it is essential for policymakers to frequently monitor this issue and investigate the fair distribution of hospital beds.

  7. Distributed Sleep Scheduling in Wireless Sensor Networks via Fractional Domatic Partitioning

    NASA Astrophysics Data System (ADS)

    Schumacher, André; Haanpää, Harri

    We consider setting up sleep scheduling in sensor networks. We formulate the problem as an instance of the fractional domatic partition problem and obtain a distributed approximation algorithm by applying linear programming approximation techniques. Our algorithm is an application of the Garg-Könemann (GK) scheme that requires solving an instance of the minimum weight dominating set (MWDS) problem as a subroutine. Our two main contributions are a distributed implementation of the GK scheme for the sleep-scheduling problem and a novel asynchronous distributed algorithm for approximating MWDS based on a primal-dual analysis of Chvátal's set-cover algorithm. We evaluate our algorithm with ns2 simulations.

  8. 24 CFR 982.101 - Allocation of funding.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... law; (ii) funding incapable of geographic formula allocation (e.g., for renewal of expiring funding increments); or (iii) funding allocated by an objective fair share formula. Funding allocated by fair share formula is distributed by a competitive process. (c) Competitive process. For budget authority that is...

  9. 24 CFR 982.101 - Allocation of funding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... law; (ii) funding incapable of geographic formula allocation (e.g., for renewal of expiring funding increments); or (iii) funding allocated by an objective fair share formula. Funding allocated by fair share formula is distributed by a competitive process. (c) Competitive process. For budget authority that is...

  10. 24 CFR 982.101 - Allocation of funding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... law; (ii) funding incapable of geographic formula allocation (e.g., for renewal of expiring funding increments); or (iii) funding allocated by an objective fair share formula. Funding allocated by fair share formula is distributed by a competitive process. (c) Competitive process. For budget authority that is...

  11. An innovative approach for distributed and integrated resources planning for the Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Shinkle, Gerald L.; Weiler, Jerry D.; Willoughby, John K.

    1990-01-01

    This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.

  12. User interface issues in supporting human-computer integrated scheduling

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Biefeld, Eric W.

    1991-01-01

    The topics are presented in view graph form and include the following: characteristics of Operations Mission Planner (OMP) schedule domain; OMP architecture; definition of a schedule; user interface dimensions; functional distribution; types of users; interpreting user interaction; dynamic overlays; reactive scheduling; and transitioning the interface.

  13. Proceedings of the Expert Systems Workshop Held in Pacific Grove, California on 16-18 April 1986

    DTIC Science & Technology

    1986-04-18

    13- NUMBER OF PAGES 197 N IS. SECURITY CLASS, (ol Mm raport) UNCLASSIFIED I5a. DECLASSIFI CATION/DOWNGRADING SCHEDULE 16. DISTRIBUTION...are distributed and parallel. * - Features unimplemented at present; scheduled for phase 2. Table 1-1: Key design characteristics of ABE 2. a...data structuring techniques and a semi- deterministic scheduler . A program for the DF framework consists of a number of independent processing modules

  14. A novel downlink scheduling strategy for traffic communication system based on TD-LTE technology.

    PubMed

    Chen, Ting; Zhao, Xiangmo; Gao, Tao; Zhang, Licheng

    2016-01-01

    There are many existing classical scheduling algorithms which can obtain better system throughput and user equality, however, they are not designed for traffic transportation environment, which cannot consider whether the transmission performance of various information flows could meet comprehensive requirements of traffic safety and delay tolerance. This paper proposes a novel downlink scheduling strategy for traffic communication system based on TD-LTE technology, which can perform two classification mappings for various information flows in the eNodeB: firstly, associate every information flow packet with traffic safety importance weight according to its relevance to the traffic safety; secondly, associate every traffic information flow with service type importance weight according to its quality of service (QoS) requirements. Once the connection is established, at every scheduling moment, scheduler would decide the scheduling order of all buffers' head of line packets periodically according to the instant value of scheduling importance weight function, which calculated by the proposed algorithm. From different scenario simulations, it can be verified that the proposed algorithm can provide superior differentiated transmission service and reliable QoS guarantee to information flows with different traffic safety levels and service types, which is more suitable for traffic transportation environment compared with the existing popularity PF algorithm. With the limited wireless resource, information flow closed related to traffic safety will always obtain priority scheduling right timely, which can help the passengers' journey more safe. Moreover, the proposed algorithm cannot only obtain good flow throughput and user fairness which are almost equal to those of the PF algorithm without significant differences, but also provide better realtime transmission guarantee to realtime information flow.

  15. Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

    NASA Technical Reports Server (NTRS)

    Short, Nick, Jr.; Bedet, Jean-Jacques; Bodden, Lee; Boddy, Mark; White, Jim; Beane, John

    1994-01-01

    The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications scheduling.

  16. KSC-2011-6055

    NASA Image and Video Library

    2011-07-27

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 41, the Atlas rocket stacked inside the Vertical Integration Facility stands ready to receive the Juno spacecraft, enclosed in an Atlas payload fairing. The spacecraft was prepared for launch in the Astrotech Space Operations' payload processing facility in Titusville, Fla. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Juno is scheduled to launch Aug. 5 aboard a United Launch Alliance Atlas V rocket from Cape Canaveral Air Force Station in Florida. The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. For more information, visit www.nasa.gov/juno. Photo credit: NASA/Cory Huston

  17. KSC-2011-6551

    NASA Image and Video Library

    2011-08-24

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 17B on Cape Canaveral Air Force Station in Florida, the sections of the clamshell-shaped Delta payload fairing close in around NASA's twin Gravity Recovery and Interior Laboratory spacecraft. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Launch aboard a United Launch Alliance Delta II rocket from Pad 17B is scheduled for Sept. 8. The spacecraft will fly in tandem orbits around the moon for several months to measure its gravity field. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Jim Grossmann

  18. KSC-2011-6544

    NASA Image and Video Library

    2011-08-23

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 17B on Cape Canaveral Air Force Station in Florida, NASA's twin Gravity Recovery and Interior Laboratory spacecraft are uncovered and ready for enclosure in the Delta payload fairing. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Launch aboard a United Launch Alliance Delta II rocket from Pad 17B is scheduled for Sept. 8. The spacecraft will fly in tandem orbits around the moon for several months to measure its gravity field. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Jim Grossmann

  19. KSC-2011-6545

    NASA Image and Video Library

    2011-08-23

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 17B on Cape Canaveral Air Force Station in Florida, NASA's twin Gravity Recovery and Interior Laboratory spacecraft are secured atop a Delta II rocket awaiting enclosure in the Delta payload fairing. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Launch aboard a United Launch Alliance Delta II rocket from Pad 17B is scheduled for Sept. 8. The spacecraft will fly in tandem orbits around the moon for several months to measure its gravity field. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Jim Grossmann

  20. KSC-2011-6552

    NASA Image and Video Library

    2011-08-24

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 17B on Cape Canaveral Air Force Station in Florida, the sections of the Delta payload fairing form a protective cocoon around NASA's twin Gravity Recovery and Interior Laboratory spacecraft. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Launch aboard a United Launch Alliance Delta II rocket from Pad 17B is scheduled for Sept. 8. The spacecraft will fly in tandem orbits around the moon for several months to measure its gravity field. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Jim Grossmann

  1. Post-Stall Aerodynamic Modeling and Gain-Scheduled Control Design

    NASA Technical Reports Server (NTRS)

    Wu, Fen; Gopalarathnam, Ashok; Kim, Sungwan

    2005-01-01

    A multidisciplinary research e.ort that combines aerodynamic modeling and gain-scheduled control design for aircraft flight at post-stall conditions is described. The aerodynamic modeling uses a decambering approach for rapid prediction of post-stall aerodynamic characteristics of multiple-wing con.gurations using known section data. The approach is successful in bringing to light multiple solutions at post-stall angles of attack right during the iteration process. The predictions agree fairly well with experimental results from wind tunnel tests. The control research was focused on actuator saturation and .ight transition between low and high angles of attack regions for near- and post-stall aircraft using advanced LPV control techniques. The new control approaches maintain adequate control capability to handle high angle of attack aircraft control with stability and performance guarantee.

  2. TDRS-L Media Day

    NASA Image and Video Library

    2014-01-03

    TITUSVILLE, Fla. – Members of the news media are given an opportunity for an up-close look at the Tracking and Data Relay Satellite, or TDRS-L, spacecraft undergoing preflight processing inside the Astrotech payload processing facility in Titusville. TDRS-L is being prepared for encapsulation inside its payload fairing prior to being transported to Launch Complex 41 at Cape Canaveral Air Force Station. Journalists visited Astrotech as part of TDRS-L Media Day to conduct interviews and photograph the satellite that will be a part of the second of three next-generation spacecraft designed to ensure vital operational continuity for the NASA Space Network. It is scheduled to launch from Cape Canaveral's Space Launch Complex 41 atop an Atlas V rocket in January 2014. The current Tracking and Data Relay Satellite system consists of eight in-orbit satellites distributed to provide near continuous information relay contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. For more information, visit: http://www.nasa.gov/mission_pages/tdrs/home/index.html

  3. Fair Use: Articulating the Liberal Approach

    ERIC Educational Resources Information Center

    Davis, Anthony, Jr.

    2012-01-01

    Within the context of "Cambridge University Press et al. v. Patton et al.", this article provides the rationale for the academic distribution of scholarly articles without requesting copyright permission or paying the corresponding fees. The fair use of scholarly articles is examined legally, historically, and in an economic context. This article…

  4. The Missed Promotion: An Exercise Demonstrating the Importance of Organizational Justice

    ERIC Educational Resources Information Center

    Caza, Arran; Caza, Brianna Barker; Lind, E. Allan

    2011-01-01

    Treating employees fairly produces many positive outcomes, but evidence suggests that managers' efforts to be fair are often unsuccessful because they emphasize the wrong aspects of justice. Managers tend to emphasize distributive justice, though employees may be most concerned with procedural and interactional justice. Organizational justice…

  5. Understanding Copyright and Fair Use in the Music Classroom

    ERIC Educational Resources Information Center

    Drummond, Tim

    2015-01-01

    Many music educators do not sufficiently understand the complicated system of U.S. copyright law or what constitutes "fair use," resulting in both illegal and overly conservative practices. Increasingly accessible recording and distribution technology has also led to common practices such as posting performances on YouTube, creating…

  6. Perceived Social Policy Fairness and Subjective Wellbeing: Evidence from China

    ERIC Educational Resources Information Center

    Sun, Feng; Xiao, Jing Jian

    2012-01-01

    This study examined the relationship between perceived fairness of social policies and subjective well-being. Two types of policies examined were related to income distribution and social security. Subjective well-being was measured by work and life satisfaction. In addition, subjective well-beings between different income, age, and education…

  7. Fair Access to Higher Education: A Comparative Perspective

    ERIC Educational Resources Information Center

    Mountford-Zimdars, Anna; Sabbagh, Daniel

    2013-01-01

    This special issue introduces a set of article addressing the question of what "fairness" means with respect to the distribution of access to higher education. Articles herein address the criteria that "should" be used to allocate funding, offers of admission at selective institutions, and conceiving and assessing …

  8. Collaborative Distributed Scheduling Approaches for Wireless Sensor Network

    PubMed Central

    Niu, Jianjun; Deng, Zhidong

    2009-01-01

    Energy constraints restrict the lifetime of wireless sensor networks (WSNs) with battery-powered nodes, which poses great challenges for their large scale application. In this paper, we propose a family of collaborative distributed scheduling approaches (CDSAs) based on the Markov process to reduce the energy consumption of a WSN. The family of CDSAs comprises of two approaches: a one-step collaborative distributed approach and a two-step collaborative distributed approach. The approaches enable nodes to learn the behavior information of its environment collaboratively and integrate sleep scheduling with transmission scheduling to reduce the energy consumption. We analyze the adaptability and practicality features of the CDSAs. The simulation results show that the two proposed approaches can effectively reduce nodes' energy consumption. Some other characteristics of the CDSAs like buffer occupation and packet delay are also analyzed in this paper. We evaluate CDSAs extensively on a 15-node WSN testbed. The test results show that the CDSAs conserve the energy effectively and are feasible for real WSNs. PMID:22408491

  9. Fair Package Assignment

    NASA Astrophysics Data System (ADS)

    Lahaie, Sébastien; Parkes, David C.

    We consider the problem of fair allocation in the package assignment model, where a set of indivisible items, held by single seller, must be efficiently allocated to agents with quasi-linear utilities. A fair assignment is one that is efficient and envy-free. We consider a model where bidders have superadditive valuations, meaning that items are pure complements. Our central result is that core outcomes are fair and even coalition-fair over this domain, while fair distributions may not even exist for general valuations. Of relevance to auction design, we also establish that the core is equivalent to the set of anonymous-price competitive equilibria, and that superadditive valuations are a maximal domain that guarantees the existence of anonymous-price competitive equilibrium. Our results are analogs of core equivalence results for linear prices in the standard assignment model, and for nonlinear, non-anonymous prices in the package assignment model with general valuations.

  10. A Network Pump

    DTIC Science & Technology

    1996-05-01

    introduced as shown in Fig. 3. Pump ~ y { ~ ~ ~ = ~ messages ACK buffer Fig. 3. The Basic Pump The basic Pump [6] places a buffer (size n ) between...exponential distribution with mean x. Define Q = fY(MAll - T,) + k . ( N - Fair size) where N is the number of messages in buffer, at the time the...message is placed in buffer,,, and k . ( N - Fair size) is a feedback term. Both k and Fair size can be chosen by a sys- tem designer. Note that the moving

  11. OA-7 Post-Encapsulation

    NASA Image and Video Library

    2017-03-10

    The Orbital ATK Cygnus spacecraft was encapsulted in its payload fairings inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station on March 24, 2017. CYGNUS will deliver 7,600 of pounds of supplies, equipment and scientific research materials to the space station.

  12. KSC-92PC-1538

    NASA Image and Video Library

    1992-07-18

    CAPE CANAVERAL, Fla. -- At Cape Canaveral Air Force Station's Launch Complex 17, Pad A, technicians encapsulate the Geotail spacecraft upper and attached Payload Assist Module-D upper stage lower in the protective payload fairing. Geotail and secondary payload Diffuse Ultraviolet Experiment DUVE are scheduled for launch about the Delta II rocket on July 24. The GEOTAIL mission is a collaborative project undertaken by the Institute of Space and Astronautical Science ISAS, Japan Aerospace Exploration Agency JAXA and NASA. Photo Credit: NASA

  13. Software is a Product...Not

    DTIC Science & Technology

    1992-09-01

    understand the process if we consider software as a service , not a prod- uct. Let me expand on this statement. I do not believe we must do any of the... software -building activities differently. Instead, from the perspective of schedul- ing, budgeting, and delivering software , we should use the service ...While we’re not perfect, we do a fairly its upgrades. The pricing scheme be- good job of managing hardware engi- Software as a service . What is a

  14. 14 CFR 323.16 - Listings in schedule publications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Listings in schedule publications. 323.16... schedule publications. Each air carrier filing a notice under § 323.3 (a)(2), (a)(4), (a)(5), or (c) shall continue to list the affected flights in all generally-distributed schedule publications in which the...

  15. 14 CFR 323.16 - Listings in schedule publications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Listings in schedule publications. 323.16... schedule publications. Each air carrier filing a notice under § 323.3 (a)(2), (a)(4), (a)(5), or (c) shall continue to list the affected flights in all generally-distributed schedule publications in which the...

  16. 14 CFR 323.16 - Listings in schedule publications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Listings in schedule publications. 323.16... schedule publications. Each air carrier filing a notice under § 323.3 (a)(2), (a)(4), (a)(5), or (c) shall continue to list the affected flights in all generally-distributed schedule publications in which the...

  17. SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

    NASA Technical Reports Server (NTRS)

    Thalman, Nancy E.; Sparn, Thomas P.

    1990-01-01

    SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

  18. Design and Scheduling of Microgrids using Benders Decomposition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nagarajan, Adarsh; Ayyanar, Raja

    2016-11-21

    The distribution feeder laterals in a distribution feeder with relatively high PV generation as compared to the load can be operated as microgrids to achieve reliability, power quality and economic benefits. However, renewable resources are intermittent and stochastic in nature. A novel approach for sizing and scheduling an energy storage system and microturbine for reliable operation of microgrids is proposed. The size and schedule of an energy storage system and microturbine are determined using Benders' decomposition, considering PV generation as a stochastic resource.

  19. The Relationship between the Perceptions of the Fairness of the Learning Environment and the Level of Alienation

    ERIC Educational Resources Information Center

    Çaglar, Çaglar

    2013-01-01

    Problem Statement: The phenomenon of justice, which is defined as conformity to what is right and legal, is conceptualized into three aspects: "distributive justice," "procedural justice" and "interactional justice" in educational organizations. The more students perceive their learning environment to be fair, the…

  20. Adolescents' Perceptions of Institutional Fairness: Relations with Moral Reasoning, Emotions, and Behavior

    ERIC Educational Resources Information Center

    Arsenio, William F.; Preziosi, Susanna; Silberstein, Erica; Hamburger, Benjamin

    2012-01-01

    This article addresses how low-income urban adolescents view the fairness of different aspects of American society, including how wealth is distributed, the nature of legal constraints, and overall social opportunities and legitimacy. This research emerged from efforts to understand the moral and emotional nature of some adolescents' aggressive…

  1. Optimized Hypervisor Scheduler for Parallel Discrete Event Simulations on Virtual Machine Platforms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoginath, Srikanth B; Perumalla, Kalyan S

    2013-01-01

    With the advent of virtual machine (VM)-based platforms for parallel computing, it is now possible to execute parallel discrete event simulations (PDES) over multiple virtual machines, in contrast to executing in native mode directly over hardware as is traditionally done over the past decades. While mature VM-based parallel systems now offer new, compelling benefits such as serviceability, dynamic reconfigurability and overall cost effectiveness, the runtime performance of parallel applications can be significantly affected. In particular, most VM-based platforms are optimized for general workloads, but PDES execution exhibits unique dynamics significantly different from other workloads. Here we first present results frommore » experiments that highlight the gross deterioration of the runtime performance of VM-based PDES simulations when executed using traditional VM schedulers, quantitatively showing the bad scaling properties of the scheduler as the number of VMs is increased. The mismatch is fundamental in nature in the sense that any fairness-based VM scheduler implementation would exhibit this mismatch with PDES runs. We also present a new scheduler optimized specifically for PDES applications, and describe its design and implementation. Experimental results obtained from running PDES benchmarks (PHOLD and vehicular traffic simulations) over VMs show over an order of magnitude improvement in the run time of the PDES-optimized scheduler relative to the regular VM scheduler, with over 20 reduction in run time of simulations using up to 64 VMs. The observations and results are timely in the context of emerging systems such as cloud platforms and VM-based high performance computing installations, highlighting to the community the need for PDES-specific support, and the feasibility of significantly reducing the runtime overhead for scalable PDES on VM platforms.« less

  2. KSC-2014-2842

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Preparations are underway to move a section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, onto a transportation cradle in the Building 836 high bay on south Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  3. KSC-2014-2833

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers hoist the lid off the transportation trailer containing the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  4. KSC-2014-2838

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers lift a section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, from a transportation trailer in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  5. KSC-2014-2844

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers move a section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, from a hardware dolly toward a transportation cradle in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  6. Pegasus XL CYGNSS Fairing Mate Complete

    NASA Image and Video Library

    2016-11-15

    In Building 1555 at Vandenberg Air Force Base in California, an Orbital ATK Pegasus XL rocket is seen after payload fairing installation. On board Pegasus are eight NASA Cyclone Global Navigation Satellite System, or CYGNSS, spacecraft. When preparations are competed at Vandenberg, the L-1011/Pegasus XL combination will be flown to NASA’s Kennedy Space Center in Florida. On Dec. 12, 2016, the carrier aircraft is scheduled to take off from the Skid Strip at Cape Canaveral Air Force Station and CYGNSS will launch on the Pegasus XL rocket with the L-1011 flying off shore. CYGNSS satellites will make frequent and accurate measurements of ocean surface winds throughout the life cycle of tropical storms and hurricanes. The data that CYGNSS provides will help scientists to probe key air-sea interaction processes that take place near the core of storms, which are rapidly changing and play a crucial role in the beginning and intensification of hurricanes.

  7. Pegasus XL CYGNSS Fairing Installation

    NASA Image and Video Library

    2016-11-11

    At Vandenberg Air Force Base in California, an Orbital ATK Pegasus XL rocket is seen during payload fairing installation in Building 1555. On board Pegasus are eight NASA Cyclone Global Navigation Satellite System, or CYGNSS, spacecraft. When preparations are competed at Vandenberg, the L-1011/Pegasus XL combination will be flown to NASA’s Kennedy Space Center in Florida. On Dec. 12, 2016, the carrier aircraft is scheduled to take off from the Skid Strip at Cape Canaveral Air Force Station and CYGNSS will launch on the Pegasus XL rocket with the L-1011 flying off shore. CYGNSS satellites will make frequent and accurate measurements of ocean surface winds throughout the life cycle of tropical storms and hurricanes. The data that CYGNSS provides will help scientists to probe key air-sea interaction processes that take place near the core of storms, which are rapidly changing and play a crucial role in the beginning and intensification of hurricanes.

  8. Pegasus XL CYGNSS Fairing Installation

    NASA Image and Video Library

    2016-11-11

    In Building 1555 at Vandenberg Air Force Base in California, the payload fairing is being installed on an Orbital ATK Pegasus XL rocket. On board Pegasus are eight NASA Cyclone Global Navigation Satellite System, or CYGNSS, spacecraft. When preparations are competed at Vandenberg, the L-1011/Pegasus XL combination will be flown to NASA’s Kennedy Space Center in Florida. On Dec. 12, 2016, the carrier aircraft is scheduled to take off from the Skid Strip at Cape Canaveral Air Force Station and CYGNSS will launch on the Pegasus XL rocket with the L-1011 flying off shore. CYGNSS satellites will make frequent and accurate measurements of ocean surface winds throughout the life cycle of tropical storms and hurricanes. The data that CYGNSS provides will help scientists to probe key air-sea interaction processes that take place near the core of storms, which are rapidly changing and play a crucial role in the beginning and intensification of hurricanes.

  9. KSC-2014-2840

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers prepare to rotate a section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in a lifting device in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  10. KSC-2014-2837

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers prepare to lift the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, from a transportation trailer in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  11. KSC-2014-2832

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – The transportation trailer containing the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, arrives in the Building 836 high bay on south Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  12. KSC-2014-2834

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – The lid is lifted from the transportation trailer containing the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  13. KSC-2014-2836

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – The lid is removed from the transportation trailer containing the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  14. KSC-2014-2843

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – A section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, secured to a lifting device, glides across the floor of the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  15. KSC-2014-2841

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers rotate a section of the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in a lifting device in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  16. KSC-2011-6054

    NASA Image and Video Library

    2011-07-27

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 41, the Juno spacecraft, enclosed in an Atlas payload fairing, nears the top of the Vertical Integration Facility where it will be positioned on top of the Atlas rocket already stacked inside. The spacecraft was prepared for launch in the Astrotech Space Operations' payload processing facility in Titusville, Fla. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Juno is scheduled to launch Aug. 5 aboard a United Launch Alliance Atlas V rocket from Cape Canaveral Air Force Station in Florida. The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. For more information, visit www.nasa.gov/juno. Photo credit: NASA/Cory Huston

  17. KSC-2013-2628

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences engineers connect the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  18. KSC-2013-2601

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB, Calif. – Engineers conduct inspections on NASA's IRIS spacecraft with blacklights before the payload fairing before it is connected. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Randy Beaudoin

  19. KSC-2013-2642

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences team engineers monitor the connection of the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  20. KSC-2013-2640

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – The payload fairing locked in place over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  1. KSC-2013-2618

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences team members watch as engineers connect the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  2. KSC-2013-2613

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Engineers attach the starboard side of the payload fairing into place for NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Randy Beaudoin

  3. KSC-2013-2581

    NASA Image and Video Library

    2013-06-05

    VANDENBERG AFB – Engineers move the port side of the payload fairing before it is connected into place for NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Randy Beaudoin

  4. KSC-2013-2617

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB - Orbital Sciences engineers connect the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  5. KSC-2013-2636

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences engineers connect the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  6. KSC-2013-2641

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences engineers monitor the connection of the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  7. KSC-2013-2619

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – NASA's IRIS spacecraft before the second half of the payload fairing is installed over it. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  8. KSC-2013-2635

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences engineers connect the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  9. KSC-2013-2633

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences team members move the second half of the payload fairing before it is placed over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  10. KSC-2013-2639

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences engineers connect the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  11. KSC-2013-2637

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences engineers connect the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  12. KSC-2013-2630

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences team members move the second half of the payload fairing before it is placed over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  13. KSC-2013-2602

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB, Calif. – Engineers conduct inspections on NASA's IRIS spacecraft with blacklights before the payload fairing before it is connected. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Randy Beaudoin

  14. KSC-2013-2580

    NASA Image and Video Library

    2013-06-05

    - VANDENBERG AFB – An engineer makes preparations on the starboard side of the payload fairing before it is connected into place for NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Randy Beaudoin

  15. KSC-2013-2626

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences team members move the second half of the payload fairing before it is placed over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  16. KSC-2013-2616

    NASA Image and Video Library

    2013-06-11

    Orbital Sciences engineers connect the payload fairing over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  17. KSC-2013-2629

    NASA Image and Video Library

    2013-06-10

    VANDENBERG AFB – Orbital Sciences team members move the second half of the payload fairing before it is placed over NASA's IRIS spacecraft. The fairing connects to the nose of the Orbital Sciences Pegasus XL rocket that will lift the solar observatory into orbit in June. The work is taking place in a hangar at Vandenberg Air Force Base where IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch on a Pegasus XL rocket. Scheduled for launch from Vandenberg June 26, IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: NASA/Tony Vauclin

  18. KSC-2014-3461

    NASA Image and Video Library

    2014-08-07

    VANDENBERG AIR FORCE BASE, Calif. – The half sections of the 10-foot-diameter fairing for NASA's Soil Moisture Active Passive mission, or SMAP, are delivered to the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for no earlier than November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  19. KSC-2014-3462

    NASA Image and Video Library

    2014-08-07

    VANDENBERG AIR FORCE BASE, Calif. – The half sections of the 10-foot-diameter fairing for NASA's Soil Moisture Active Passive mission, or SMAP, arrive at the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for no earlier than November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  20. KSC-2011-1081

    NASA Image and Video Library

    2011-01-13

    VANDENBERG AIR FORCE BASE, Calif. -- Workers move one half of the fairing, wrapped in plastic protective covering, into a cargo container for transport from the Orbital Sciences Corp. Building 1555 at Vandenberg Air Force Base in California to the Astrotech Payload Processing Facility. Once both halves of the fairing are delivered to Astrotech they will be installed around NASA's Glory satellite to protect it from the weather at the launch pad as well as from the atmosphere during flight. A four-stage Taurus XL rocket will carry Glory into low Earth orbit. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 2:09 a.m. PST Feb. 23 from Vandenberg's Space Launch Complex 576-E. For information, visit www.nasa.gov/glory. Photo credit: NASA/Randy Beaudoin, VAFB

  1. KSC-2011-1082

    NASA Image and Video Library

    2011-01-13

    VANDENBERG AIR FORCE BASE, Calif. -- Workers move one half of the fairing, wrapped in plastic protective covering, into a cargo container for transport from the Orbital Sciences Corp. Building 1555 at Vandenberg Air Force Base in California to the Astrotech Payload Processing Facility. Once both halves of the fairing are delivered to Astrotech they will be installed around NASA's Glory satellite to protect it from the weather at the launch pad as well as from the atmosphere during flight. A four-stage Taurus XL rocket will carry Glory into low Earth orbit. Once Glory reaches orbit, it will collect data on the properties of aerosols and black carbon. It also will help scientists understand how the sun's irradiance affects Earth's climate. Launch is scheduled for 2:09 a.m. PST Feb. 23 from Vandenberg's Space Launch Complex 576-E. For information, visit www.nasa.gov/glory. Photo credit: NASA/Randy Beaudoin, VAFB

  2. KSC-2011-6555

    NASA Image and Video Library

    2011-08-24

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 17B on Cape Canaveral Air Force Station in Florida, NASA's twin Gravity Recovery and Interior Laboratory spacecraft are hidden from view as spacecraft technicians secure the sections of the clamshell-shaped Delta payload fairing around them. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Launch aboard a United Launch Alliance Delta II rocket from Pad 17B is scheduled for Sept. 8. The spacecraft will fly in tandem orbits around the moon for several months to measure its gravity field. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Jim Grossmann

  3. KSC-2011-6549

    NASA Image and Video Library

    2011-08-23

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 17B on Cape Canaveral Air Force Station in Florida, spacecraft technicians dressed in clean room attire, known as "bunny" suits, secure half of the clamshell-shaped Delta payload fairing around NASA's twin Gravity Recovery and Interior Laboratory spacecraft. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Launch aboard a United Launch Alliance Delta II rocket from Pad 17B is scheduled for Sept. 8. The spacecraft will fly in tandem orbits around the moon for several months to measure its gravity field. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Jim Grossmann

  4. KSC-2011-6543

    NASA Image and Video Library

    2011-08-23

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 17B on Cape Canaveral Air Force Station in Florida, spacecraft technicians dressed in clean room attire, known as "bunny" suits, uncover NASA's twin Gravity Recovery and Interior Laboratory spacecraft during preparations to enclose it in the Delta payload fairing. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Launch aboard a United Launch Alliance Delta II rocket from Pad 17B is scheduled for Sept. 8. The spacecraft will fly in tandem orbits around the moon for several months to measure its gravity field. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Jim Grossmann

  5. KSC-2011-6548

    NASA Image and Video Library

    2011-08-23

    CAPE CANAVERAL, Fla. -- At Space Launch Complex 17B on Cape Canaveral Air Force Station in Florida, spacecraft technicians monitor the movement of a section of the clamshell-shaped Delta payload fairing as it encloses NASA's twin Gravity Recovery and Interior Laboratory spacecraft. The fairing will protect the spacecraft from the impact of aerodynamic pressure and heating during ascent and will be jettisoned once the spacecraft is outside the Earth's atmosphere. Launch aboard a United Launch Alliance Delta II rocket from Pad 17B is scheduled for Sept. 8. The spacecraft will fly in tandem orbits around the moon for several months to measure its gravity field. GRAIL's primary science objectives are to determine the structure of the lunar interior, from crust to core, and to advance understanding of the thermal evolution of the moon. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Jim Grossmann

  6. KSC-2014-2835

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – A worker steadies the lid of the transportation trailer containing the fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in the Building 836 high bay on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  7. The self-report Dissociative Disorders Interview Schedule: A preliminary report.

    PubMed

    Ross, Colin A; Browning, Elena

    2017-01-01

    A self-report version of the Dissociative Disorders Interview Schedule (SR-DDIS) was administered to 100 inpatients in a hospital-based trauma program. All participants had previously completed the interviewer-administered version of the DDIS. When we compared the overall results on the DDIS and SR-DDIS for the 100 inpatients, the findings were very consistent for both symptom clusters and Diagnostic and Statistical Manual of Mental Disorders, Fifth Edition (DSM-5), diagnoses. The agreement rate between the 2 versions for DSM-5 diagnoses was fair to substantial using Cohen's kappa, with agreement being substantial for 4 out of the 7 diagnoses made by the DDIS. It appears likely that the SR-DDIS can be used instead of the DDIS, at least in clinical populations, with no clinically or conceptually significant differences between the results obtained with the 2 versions.

  8. Controller Strategies for Automation Tool Use under Varying Levels of Trajectory Prediction Uncertainty

    NASA Technical Reports Server (NTRS)

    Morey, Susan; Prevot, Thomas; Mercer, Joey; Martin, Lynne; Bienert, Nancy; Cabrall, Christopher; Hunt, Sarah; Homola, Jeffrey; Kraut, Joshua

    2013-01-01

    A human-in-the-loop simulation was conducted to examine the effects of varying levels of trajectory prediction uncertainty on air traffic controller workload and performance, as well as how strategies and the use of decision support tools change in response. This paper focuses on the strategies employed by two controllers from separate teams who worked in parallel but independently under identical conditions (airspace, arrival traffic, tools) with the goal of ensuring schedule conformance and safe separation for a dense arrival flow in en route airspace. Despite differences in strategy and methods, both controllers achieved high levels of schedule conformance and safe separation. Overall, results show that trajectory uncertainties introduced by wind and aircraft performance prediction errors do not affect the controllers' ability to manage traffic. Controller strategies were fairly robust to changes in error, though strategies were affected by the amount of delay to absorb (scheduled time of arrival minus estimated time of arrival). Using the results and observations, this paper proposes an ability to dynamically customize the display of information including delay time based on observed error to better accommodate different strategies and objectives.

  9. OA-7 Lift and Mate to Booster

    NASA Image and Video Library

    2017-03-17

    The payload fairing containing the Orbital ATK Cygnus pressurized cargo module is lowered onto the Centaur upper stage, or second stage, of the United Launch Alliance (ULA) rocket in the Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop the Atlas V from pad 41. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  10. OA-7 Lift and Mate to Booster

    NASA Image and Video Library

    2017-03-17

    The payload fairing containing the Orbital ATK Cygnus pressurized cargo module is mated to the Centaur upper stage, or second stage, of the United Launch Alliance (ULA) rocket in the Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop the Atlas V from pad 41. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  11. Bioreactor design for successive culture of anchorage-dependent cells operated in an automated manner.

    PubMed

    Kino-Oka, Masahiro; Ogawa, Natsuki; Umegaki, Ryota; Taya, Masahito

    2005-01-01

    A novel bioreactor system was designed to perform a series of batchwise cultures of anchorage-dependent cells by means of automated operations of medium change and passage for cell transfer. The experimental data on contamination frequency ensured the biological cleanliness in the bioreactor system, which facilitated the operations in a closed environment, as compared with that in flask culture system with manual handlings. In addition, the tools for growth prediction (based on growth kinetics) and real-time growth monitoring by measurement of medium components (based on small-volume analyzing machinery) were installed into the bioreactor system to schedule the operations of medium change and passage and to confirm that culture proceeds as scheduled, respectively. The successive culture of anchorage-dependent cells was conducted with the bioreactor running in an automated way. The automated bioreactor gave a successful culture performance with fair accordance to preset scheduling based on the information in the latest subculture, realizing 79- fold cell expansion for 169 h. In addition, the correlation factor between experimental data and scheduled values through the bioreactor performance was 0.998. It was concluded that the proposed bioreactor with the integration of the prediction and monitoring tools could offer a feasible system for the manufacturing process of cultured tissue products.

  12. A free market in telescope time?

    NASA Astrophysics Data System (ADS)

    Etherton, Jason; Steele, Iain A.; Mottram, Christopher J.

    2004-09-01

    As distributed systems are becoming more and more diverse in application there is a growing need for more intelligent resource scheduling. eSTAR Is a geographically distributed network of Grid-enabled telescopes, using grid middleware to provide telescope users with an authentication and authorisation method, allowing secure, remote access to such resources. The eSTAR paradigm is based upon this secure, single sign-on, giving astronomers or their agent proxies direct access to these telescopes. This concept, however, involves the complex issue of how to schedule observations stored within physically distributed media, on geographically distributed resources. This matter is complicated further by the varying degrees of constraints placed upon observations such as timeliness, atmospheric and meteorological conditions, and sky brightness to name a few. This paper discusses a free market approach to this scheduling problem, where astronomers are given credit, instead of time, from their respective TAGs to spend on telescopes as they see fit. This approach will ultimately provide a community-driven schedule, genuine indicators of the worth of specific telescope time and promote a more efficient use of that time, as well as demonstrating a 'survival of the fittest' type selection.

  13. The construction of feelings of justice in environmental management: An empirical study of multiple biodiversity conflicts in Calakmul, Mexico.

    PubMed

    Lecuyer, Lou; White, Rehema M; Schmook, Birgit; Lemay, Violaine; Calmé, Sophie

    2018-05-01

    A failure to address social concerns in biodiversity conservation can lead to feelings of injustice among some actors, and hence jeopardize conservation goals. The complex socio-cultural and political context of the Calakmul Biosphere Reserve, Mexico, has historically led to multiple biodiversity conflicts. Our goal, in this case study, was to explore perceptions of justice held by local actors in relation to biodiversity conflicts. We then aimed to determine the following: 1) people's definitions of their feelings of justice; 2) the criteria used in this assessment; 3) variability in the criteria influencing them; and 4) implications for environmental management in the region and beyond. We worked with five focus groups, exploring three examples of biodiversity conflict around forest, water and jaguar management with a total of 41 ranchers, farmers and representatives of local producers. Our results demonstrated that people constructed their feelings of justice around four dimensions of justice: recognition (acknowledging individuals' rights, values, cultures and knowledge systems); ecological (fair and respectful treatment of the natural environment), procedural (fairness in processes of environmental management), distributive (fairness in the distribution of costs and benefits). We identified a list of criteria the participants used in their appraisal of justice and sources of variation such as the social scale of focus and participant role, and whom they perceived to be responsible for resource management. We propose a new framework that conceptualizes justice-as-recognition and ecological justice as forms of conditional justices, and procedural and distributive justices as forms of practical justice. Conditional justice allows us to define who is a legitimate source of justice norms and if nature should be integrated in the scope of justice; hence, conditional justice underpins other dimensions of justice. On the other hand, procedural and distributive address the daily practices of fair processes and distribution. We propose that the perception of justice is a neglected but important aspect to include in integrative approaches to managing biodiversity conflicts. Addressing demands of justice in environmental management will require us to consider more than the distribution of costs and benefits among actors. We also need to respect the plurality of fairness perspectives and to recognize the benefits of dialogical approaches to achieve more successful environmental management. Copyright © 2018 Elsevier Ltd. All rights reserved.

  14. A distributed computing environment with support for constraint-based task scheduling and scientific experimentation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ahrens, J.P.; Shapiro, L.G.; Tanimoto, S.L.

    1997-04-01

    This paper describes a computing environment which supports computer-based scientific research work. Key features include support for automatic distributed scheduling and execution and computer-based scientific experimentation. A new flexible and extensible scheduling technique that is responsive to a user`s scheduling constraints, such as the ordering of program results and the specification of task assignments and processor utilization levels, is presented. An easy-to-use constraint language for specifying scheduling constraints, based on the relational database query language SQL, is described along with a search-based algorithm for fulfilling these constraints. A set of performance studies show that the environment can schedule and executemore » program graphs on a network of workstations as the user requests. A method for automatically generating computer-based scientific experiments is described. Experiments provide a concise method of specifying a large collection of parameterized program executions. The environment achieved significant speedups when executing experiments; for a large collection of scientific experiments an average speedup of 3.4 on an average of 5.5 scheduled processors was obtained.« less

  15. Electric power scheduling - A distributed problem-solving approach

    NASA Technical Reports Server (NTRS)

    Mellor, Pamela A.; Dolce, James L.; Krupp, Joseph C.

    1990-01-01

    Space Station Freedom's power system, along with the spacecraft's other subsystems, needs to carefully conserve its resources and yet strive to maximize overall Station productivity. Due to Freedom's distributed design, each subsystem must work cooperatively within the Station community. There is a need for a scheduling tool which will preserve this distributed structure, allow each subsystem the latitude to satisfy its own constraints, and preserve individual value systems while maintaining Station-wide integrity.

  16. 26 CFR 1.307-2 - Exception.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... from gross income under section 305(a), shall be zero if the fair market value of such rights on the date of distribution is less than 15 percent of the fair market value of the old stock on that date... the election was made. Any shareholder making such an election shall retain a copy of the election and...

  17. 26 CFR 1.307-2 - Exception.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... excluded from gross income under section 305(a), shall be zero if the fair market value of such rights on the date of distribution is less than 15 percent of the fair market value of the old stock on that... for which the election was made. Any shareholder making such an election shall retain a copy of the...

  18. 26 CFR 1.307-2 - Exception.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... excluded from gross income under section 305(a), shall be zero if the fair market value of such rights on the date of distribution is less than 15 percent of the fair market value of the old stock on that... for which the election was made. Any shareholder making such an election shall retain a copy of the...

  19. 26 CFR 1.307-2 - Exception.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... excluded from gross income under section 305(a), shall be zero if the fair market value of such rights on the date of distribution is less than 15 percent of the fair market value of the old stock on that... for which the election was made. Any shareholder making such an election shall retain a copy of the...

  20. 26 CFR 1.307-2 - Exception.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... from gross income under section 305(a), shall be zero if the fair market value of such rights on the date of distribution is less than 15 percent of the fair market value of the old stock on that date... the election was made. Any shareholder making such an election shall retain a copy of the election and...

  1. 26 CFR 1.643(a)-8 - Certain distributions by charitable remainder trusts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...: Example 1. Deemed sale by trust. Donor contributes stock having a fair market value of $2 million to a charitable remainder unitrust with a unitrust amount of 50 percent of the net fair market value of the trust... the present value of the remainder interest passing to charity, the trust will not be treated as...

  2. From the ideal market to the ideal clinic: constructing a normative standard of fairness for human subjects research.

    PubMed

    Phillips, Trisha

    2011-02-01

    Preventing exploitation in human subjects research requires a benchmark of fairness against which to judge the distribution of the benefits and burdens of a trial. This paper proposes the ideal market and its fair market price as a criterion of fairness. The ideal market approach is not new to discussions about exploitation, so this paper reviews Wertheimer's inchoate presentation of the ideal market as a principle of fairness, attempt of Emanuel and colleagues to apply the ideal market to human subjects research, and Ballantyne's criticisms of both the ideal market and the resulting benchmark of fairness. It argues that the criticism of this particular benchmark is on point, but the rejection of the ideal market is mistaken. After presenting a complete account of the ideal market, this paper proposes a new method for applying the ideal market to human subjects research and illustrates the proposal by considering a sample case.

  3. On the Fair Division of Multiple Stochastic Pies to Multiple Agents within the Nash Bargaining Solution

    PubMed Central

    Karmperis, Athanasios C.; Aravossis, Konstantinos; Tatsiopoulos, Ilias P.; Sotirchos, Anastasios

    2012-01-01

    The fair division of a surplus is one of the most widely examined problems. This paper focuses on bargaining problems with fixed disagreement payoffs where risk-neutral agents have reached an agreement that is the Nash-bargaining solution (NBS). We consider a stochastic environment, in which the overall return consists of multiple pies with uncertain sizes and we examine how these pies can be allocated with fairness among agents. Specifically, fairness is based on the Aristotle’s maxim: “equals should be treated equally and unequals unequally, in proportion to the relevant inequality”. In this context, fairness is achieved when all the individual stochastic surplus shares which are allocated to agents are distributed in proportion to the NBS. We introduce a novel algorithm, which can be used to compute the ratio of each pie that should be allocated to each agent, in order to ensure fairness within a symmetric or asymmetric NBS. PMID:23024752

  4. On fairness, full cooperation, and quantum game with incomplete information

    NASA Astrophysics Data System (ADS)

    Lei, Zhen-Zhou; Liu, Bo-Yang; Yi, Ying; Dai, Hong-Yi; Zhang, Ming

    2018-03-01

    Quantum entanglement has emerged as a new resource to enhance cooperation and remove dilemmas. This paper aims to explore conditions under which full cooperation is achievable even when the information of payoff is incomplete. Based on the quantum version of the extended classical cash in a hat game, we demonstrate that quantum entanglement may be used for achieving full cooperation or avoiding moral hazards with the reasonable profit distribution policies even when the profit is uncertain to a certain degree. This research further suggests that the fairness of profit distribution should play an important role in promoting full cooperation. It is hopeful that quantum entanglement and fairness will promote full cooperation among distant people from various interest groups when quantum networks and quantum entanglement are accessible to the public. Project supported by the National Natural Science Foundation of China (Grant Nos. 61673389, 61273202, and 61134008.

  5. Toward an Autonomous Telescope Network: the TBT Scheduler

    NASA Astrophysics Data System (ADS)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  6. Non-Evolutionary Algorithms for Scheduling Dependent Tasks in Distributed Heterogeneous Computing Environments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wayne F. Boyer; Gurdeep S. Hura

    2005-09-01

    The Problem of obtaining an optimal matching and scheduling of interdependent tasks in distributed heterogeneous computing (DHC) environments is well known to be an NP-hard problem. In a DHC system, task execution time is dependent on the machine to which it is assigned and task precedence constraints are represented by a directed acyclic graph. Recent research in evolutionary techniques has shown that genetic algorithms usually obtain more efficient schedules that other known algorithms. We propose a non-evolutionary random scheduling (RS) algorithm for efficient matching and scheduling of inter-dependent tasks in a DHC system. RS is a succession of randomized taskmore » orderings and a heuristic mapping from task order to schedule. Randomized task ordering is effectively a topological sort where the outcome may be any possible task order for which the task precedent constraints are maintained. A detailed comparison to existing evolutionary techniques (GA and PSGA) shows the proposed algorithm is less complex than evolutionary techniques, computes schedules in less time, requires less memory and fewer tuning parameters. Simulation results show that the average schedules produced by RS are approximately as efficient as PSGA schedules for all cases studied and clearly more efficient than PSGA for certain cases. The standard formulation for the scheduling problem addressed in this paper is Rm|prec|Cmax.,« less

  7. Native Amazonian children forego egalitarianism in merit-based tasks when they learn to count.

    PubMed

    Jara-Ettinger, Julian; Gibson, Edward; Kidd, Celeste; Piantadosi, Steve

    2016-11-01

    Cooperation often results in a final material resource that must be shared, but deciding how to distribute that resource is not straightforward. A distribution could count as fair if all members receive an equal reward (egalitarian distributions), or if each member's reward is proportional to their merit (merit-based distributions). Here, we propose that the acquisition of numerical concepts influences how we reason about fairness. We explore this possibility in the Tsimane', a farming-foraging group who live in the Bolivian rainforest. The Tsimane' learn to count in the same way children from industrialized countries do, but at a delayed and more variable timeline, allowing us to de-confound number knowledge from age and years in school. We find that Tsimane' children who can count produce merit-based distributions, while children who cannot count produce both merit-based and egalitarian distributions. Our findings establish that the ability to count - a non-universal, language-dependent, cultural invention - can influence social cognition. © 2015 John Wiley & Sons Ltd.

  8. Effects of Reinforcer Magnitude and Distribution on Preference for Work Schedules

    ERIC Educational Resources Information Center

    Ward-Horner, John C.; Pittenger, Alexis; Pace, Gary; Fienup, Daniel M.

    2014-01-01

    When the overall magnitude of reinforcement is matched between 2 alternative work schedules, some students prefer to complete all of their work for continuous access to a reinforcer (continuous work) rather than distributed access to a reinforcer while they work (discontinuous work). We evaluated a student's preference for continuous work by…

  9. Places to Intervene to Make Complex Food Systems More Healthy, Green, Fair, and Affordable

    PubMed Central

    Malhi, Luvdeep; Karanfil, Özge; Merth, Tommy; Acheson, Molly; Palmer, Amanda; Finegood, Diane T.

    2009-01-01

    A Food Systems and Public Health conference was convened in April 2009 to consider research supporting food systems that are healthy, green, fair, and affordable. We used a complex systems framework to examine the contents of background material provided to conference participants. Application of our intervention-level framework (paradigm, goals, system structure, feedback and delays, structural elements) enabled comparison of the conference themes of healthy, green, fair, and affordable. At the level of system structure suggested actions to achieve these goals are fairly compatible, including broad public discussion and implementation of policies and programs that support sustainable food production and distribution. At the level of paradigm and goals, the challenge of making healthy and green food affordable becomes apparent as some actions may be in conflict. Systems thinking can provide insight into the challenges and opportunities to act to make the food supply more healthy, green, fair, and affordable. PMID:23173029

  10. Job Scheduling in a Heterogeneous Grid Environment

    NASA Technical Reports Server (NTRS)

    Shan, Hong-Zhang; Smith, Warren; Oliker, Leonid; Biswas, Rupak

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  11. Fair-share scheduling algorithm for a tertiary storage system

    NASA Astrophysics Data System (ADS)

    Jakl, Pavel; Lauret, Jérôme; Šumbera, Michal

    2010-04-01

    Any experiment facing Peta bytes scale problems is in need for a highly scalable mass storage system (MSS) to keep a permanent copy of their valuable data. But beyond the permanent storage aspects, the sheer amount of data makes complete data-set availability onto live storage (centralized or aggregated space such as the one provided by Scalla/Xrootd) cost prohibitive implying that a dynamic population from MSS to faster storage is needed. One of the most challenging aspects of dealing with MSS is the robotic tape component. If a robotic system is used as the primary storage solution, the intrinsically long access times (latencies) can dramatically affect the overall performance. To speed the retrieval of such data, one could organize the requests according to criterion with an aim to deliver maximal data throughput. However, such approaches are often orthogonal to fair resource allocation and a trade-off between quality of service, responsiveness and throughput is necessary for achieving an optimal and practical implementation of a truly faire-share oriented file restore policy. Starting from an explanation of the key criterion of such a policy, we will present evaluations and comparisons of three different MSS file restoration algorithms which meet fair-share requirements, and discuss their respective merits. We will quantify their impact on a typical file restoration cycle for the RHIC/STAR experimental setup and this, within a development, analysis and production environment relying on a shared MSS service [1].

  12. Computing the Expected Cost of an Appointment Schedule for Statistically Identical Customers with Probabilistic Service Times

    PubMed Central

    Dietz, Dennis C.

    2014-01-01

    A cogent method is presented for computing the expected cost of an appointment schedule where customers are statistically identical, the service time distribution has known mean and variance, and customer no-shows occur with time-dependent probability. The approach is computationally efficient and can be easily implemented to evaluate candidate schedules within a schedule optimization algorithm. PMID:24605070

  13. Factors enhancing career satisfaction among female emergency physicians.

    PubMed

    Clem, Kathleen J; Promes, Susan B; Glickman, Seth W; Shah, Anand; Finkel, Michelle A; Pietrobon, Ricardo; Cairns, Charles B

    2008-06-01

    Attrition rates in emergency medicine have been reported as high as 25% in 10 years. The number of women entering emergency medicine has been increasing, as has the number of female medical school graduates. No studies have identified factors that increase female emergency physician career satisfaction. We assess career satisfaction in women emergency physicians in the American College of Emergency Physicians (ACEP) and identify factors associated with career satisfaction. The survey questionnaire was developed by querying 3 groups: (1) ACEP women in the American Association of Women Emergency Physicians, the (2) Society for Academic Emergency Medicine Mentoring Women Interest Group, and (3) nonaffiliated female emergency physicians. Their responses were categorized into 6 main areas: schedule, relationships with colleagues, administrative support and mentoring, patient/work-related issues, career advancement opportunities, and financial. The study cohort for the survey included all female members of ACEP with a known e-mail address. All contact with survey recipients was exclusively through the e-mail that contained a uniform resource locator link to the survey itself. Two thousand five hundred two ACEP female members were sent the uniform resource locator link. The Web survey was accessed a total of 1,851 times, with a total of 1,380 surveys completed, an overall response rate of 56%. Most women were satisfied with their career as an emergency physician, 492 (35.5%) very satisfied, 610 (44.0%) satisfied, 154 (11.1%) neutral, 99 (7.1%) not satisfied, and 31 (2.3%) very unsatisfied. Significant factors for career satisfaction included amount of recognition at work, career advancement, schedule flexibility, and the fairness of financial compensation. Workplace factors associated with high satisfaction included academic practice setting and sex-equal opportunity for advancement and sex-equal financial compensation. Most of the ACEP female physicians surveyed were satisfied with their career choice of emergency medicine. Opportunities for career advancement, fairness in financial compensation, and schedule flexibility were key factors in career satisfaction among female emergency physicians.

  14. Augmentation of the space station module power management and distribution breadboard

    NASA Technical Reports Server (NTRS)

    Walls, Bryan; Hall, David K.; Lollar, Louis F.

    1991-01-01

    The space station module power management and distribution (SSM/PMAD) breadboard models power distribution and management, including scheduling, load prioritization, and a fault detection, identification, and recovery (FDIR) system within a Space Station Freedom habitation or laboratory module. This 120 VDC system is capable of distributing up to 30 kW of power among more than 25 loads. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level consists of fast, simple (from a computing standpoint) switchgear that is capable of quickly safing the system. At the next level are local load center processors, (LLP's) which execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. Above the LLP's are three cooperating artificial intelligence (AI) systems which manage load prioritizations, load scheduling, load shedding, and fault recovery and management. Recent upgrades to hardware and modifications to software at both the LLP and AI system levels promise a drastic increase in speed, a significant increase in functionality and reliability, and potential for further examination of advanced automation techniques. The background, SSM/PMAD, interface to the Lewis Research Center test bed, the large autonomous spacecraft electrical power system, and future plans are discussed.

  15. 42 CFR 7.4 - Schedule of charges.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Schedule of charges. 7.4 Section 7.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS DISTRIBUTION OF..., depending upon the cost of ingredients and the complexity of production. An up-to-date schedule of charges...

  16. Naval Postgraduate School Scheduling Support System (NPS4)

    DTIC Science & Technology

    1992-03-01

    NPSS ...... .................. 156 2. Final Exam Scheduler .. .......... 159 F. PRESENTATION SYSTEM ... ............. . 160 G. USER INTERFACE... NPSS ...... .................. 185 2. Final Exam Model ... ............ 186 3. The Class Schedulers .. .......... 186 4. Assessment of Problem Model...Information Distribution ....... 150 4.13 NPSS Optimization Process .... ............ . 157 4.14 NPSS Performance ..... ................ . 159 4.15 Department

  17. Interresponse Time Structures in Variable-Ratio and Variable-Interval Schedules

    ERIC Educational Resources Information Center

    Bowers, Matthew T.; Hill, Jade; Palya, William L.

    2008-01-01

    The interresponse-time structures of pigeon key pecking were examined under variable-ratio, variable-interval, and variable-interval plus linear feedback schedules. Whereas the variable-ratio and variable-interval plus linear feedback schedules generally resulted in a distinct group of short interresponse times and a broad distribution of longer…

  18. A hierarchically distributed architecture for fault isolation expert systems on the space station

    NASA Technical Reports Server (NTRS)

    Miksell, Steve; Coffer, Sue

    1987-01-01

    The Space Station Axiomatic Fault Isolating Expert Systems (SAFTIES) system deals with the hierarchical distribution of control and knowledge among independent expert systems doing fault isolation and scheduling of Space Station subsystems. On its lower level, fault isolation is performed on individual subsystems. These fault isolation expert systems contain knowledge about the performance requirements of their particular subsystem and corrective procedures which may be involved in repsonse to certain performance errors. They can control the functions of equipment in their system and coordinate system task schedules. On a higher level, the Executive contains knowledge of all resources, task schedules for all systems, and the relative priority of all resources and tasks. The executive can override any subsystem task schedule in order to resolve use conflicts or resolve errors that require resources from multiple subsystems. Interprocessor communication is implemented using the SAFTIES Communications Interface (SCI). The SCI is an application layer protocol which supports the SAFTIES distributed multi-level architecture.

  19. 26 CFR 1.409(p)-1 - Prohibited allocation of securities in an S corporation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) of this chapter) that, for the nonallocation year, would have been added to the account of the...)(2), is treated as distributed on the date of the prohibited allocation. Thus, the fair market value... the 1,000 outstanding shares of stock of Corporation M, with a fair market value of $30 per share, are...

  20. 26 CFR 1.409(p)-1 - Prohibited allocation of securities in an S corporation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) of this chapter) that, for the nonallocation year, would have been added to the account of the...)(2), is treated as distributed on the date of the prohibited allocation. Thus, the fair market value... the 1,000 outstanding shares of stock of Corporation M, with a fair market value of $30 per share, are...

  1. Tackling the Anglophones' Free Ride: Fair Linguistic Cooperation with a Global Lingua Franca

    ERIC Educational Resources Information Center

    Van Parijs, Philippe

    2007-01-01

    In science and in all other domains that require communication across borders, we need one lingua franca, and this lingua franca will be English. The adoption of the native language of some as everyone's lingua franca unavoidably raises a problem of justice in various senses. One of these is cooperative justice, the fair distribution of the cost…

  2. 78 FR 28467 - Regulations Enabling Elections for Certain Transactions Under Section 336(e)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... purchase new target stock from unrelated new target shareholders with cash equal to the fair market value... deemed distribution of new target stock and purchaser will have a fair market value basis in new target... percent of the voting power and value of the stock of a corporation (target) as a sale of all its...

  3. Value of information of repair times for offshore wind farm maintenance planning

    NASA Astrophysics Data System (ADS)

    Seyr, Helene; Muskulus, Michael

    2016-09-01

    A large contribution to the total cost of energy in offshore wind farms is due to maintenance costs. In recent years research has focused therefore on lowering the maintenance costs using different approaches. Decision support models for scheduling the maintenance exist already, dealing with different factors influencing the scheduling. Our contribution deals with the uncertainty in the repair times. Given the mean repair times for different turbine components we make some assumptions regarding the underlying repair time distribution. We compare the results of a decision support model for the mean times to repair and those repair time distributions. Additionally, distributions with the same mean but different variances are compared under the same conditions. The value of lowering the uncertainty in the repair time is calculated and we find that using distributions significantly decreases the availability, when scheduling maintenance for multiple turbines in a wind park. Having detailed information about the repair time distribution may influence the results of maintenance modeling and might help identify cost factors.

  4. Autonomy Architectures for a Constellation of Spacecraft

    NASA Technical Reports Server (NTRS)

    Barrett, Anthony

    2000-01-01

    Until the past few years, missions typically involved fairly large expensive spacecraft. Such missions have primarily favored using older proven technologies over more recently developed ones, and humans controlled spacecraft by manually generating detailed command sequences with low-level tools and then transmitting the sequences for subsequent execution on a spacecraft controller. This approach toward controlling a spacecraft has worked spectacularly on previous missions, but it has limitations deriving from communications restrictions - scheduling time to communicate with a particular spacecraft involves competing with other projects due to the limited number of deep space network antennae. This implies that a spacecraft can spend a long time just waiting whenever a command sequence fails. This is one reason why the New Millennium program has an objective to migrate parts of mission control tasks onboard a spacecraft to reduce wait time by making spacecraft more robust. The migrated software is called a "remote agent" and has 4 components: a mission manager to generate the high level goals, a planner/scheduler to turn goals into activities while reasoning about future expected situations, an executive/diagnostics engine to initiate and maintain activities while interpreting sensed events by reasoning about past and present situations, and a conventional real-time subsystem to interface with the spacecraft to implement an activity's primitive actions. In addition to needing remote planning and execution for isolated spacecraft, a trend toward multiple-spacecraft missions points to the need for remote distributed planning and execution. The past few years have seen missions with growing numbers of probes. Pathfinder has its rover (Sojourner), Cassini has its lander (Huygens), and the New Millenium Deep Space 3 (DS3) proposal involves a constellation of 3 spacecraft for interferometric mapping. This trend is expected to continue to progressively larger fleets. For example, one mission proposed to succeed DS3 would have 18 spacecraft flying in formation in order to detect earth-sized planets orbiting other stars. A proposed magnetospheric constellation would involve 5 to 500 spacecraft in Earth orbit to measure global phenomena within the magnetosphere. This work describes and compares three autonomy architectures for a system that continuously plans to control a fleet of spacecraft using collective mission goals instead of goals or command sequences for each spacecraft. A fleet of self-commanding spacecraft would autonomously coordinate itself to satisfy high level science and engineering goals in a changing partially-understood environment making feasible the operation of tens or even a hundred spacecraft (such as for interferometry or plasma physics missions). The easiest way to adapt autonomous spacecraft research to controlling constellations involves treating the constellation as a single spacecraft. Here one spacecraft directly controls the others as if they were connected. The controlling "master" spacecraft performs all autonomy reasoning, and the slaves only have real-time subsystems to execute the master's commands and transmit local telemetry/observations. The executive/diagnostics module starts actions and the master's real-time subsystem controls the action either locally or remotely through a slave. While the master/slave approach benefits from conceptual simplicity, it relies on an assumption that the master spacecraft's executive can continuously monitor the slaves' real-time subsystems, and this relies on high-bandwidth highly-reliable communications. Since unintended results occur fairly rarely, one way to relax the bandwidth requirements involves only monitoring unexpected events in spacecraft. Unfortunately, this disables the ability to monitor for unexpected events between spacecraft and leads to a host of coordination problems among the slaves. Also, failures in the communications system can result in losing slaves. The other two architectures improve robustness while reducing communications by progressively distributing more of the other three remote agent components across the constellation. In a teamwork architecture, all spacecraft have executives and real-time subsystems - only the leader has the planner/scheduler and mission manager. Finally, distributing all remote agent components leads to a peer-to-peer approach toward constellation control.

  5. Utilizing Traveler Demand Modeling to Predict Future Commercial Flight Schedules in the NAS

    NASA Technical Reports Server (NTRS)

    Viken, Jeff; Dollyhigh, Samuel; Smith, Jeremy; Trani, Antonio; Baik, Hojong; Hinze, Nicholas; Ashiabor, Senanu

    2006-01-01

    The current work incorporates the Transportation Systems Analysis Model (TSAM) to predict the future demand for airline travel. TSAM is a multi-mode, national model that predicts the demand for all long distance travel at a county level based upon population and demographics. The model conducts a mode choice analysis to compute the demand for commercial airline travel based upon the traveler s purpose of the trip, value of time, cost and time of the trip,. The county demand for airline travel is then aggregated (or distributed) to the airport level, and the enplanement demand at commercial airports is modeled. With the growth in flight demand, and utilizing current airline flight schedules, the Fratar algorithm is used to develop future flight schedules in the NAS. The projected flights can then be flown through air transportation simulators to quantify the ability of the NAS to meet future demand. A major strength of the TSAM analysis is that scenario planning can be conducted to quantify capacity requirements at individual airports, based upon different future scenarios. Different demographic scenarios can be analyzed to model the demand sensitivity to them. Also, it is fairly well know, but not well modeled at the airport level, that the demand for travel is highly dependent on the cost of travel, or the fare yield of the airline industry. The FAA projects the fare yield (in constant year dollars) to keep decreasing into the future. The magnitude and/or direction of these projections can be suspect in light of the general lack of airline profits and the large rises in airline fuel cost. Also, changes in travel time and convenience have an influence on the demand for air travel, especially for business travel. Future planners cannot easily conduct sensitivity studies of future demand with the FAA TAF data, nor with the Boeing or Airbus projections. In TSAM many factors can be parameterized and various demand sensitivities can be predicted for future travel. These resulting demand scenarios can be incorporated into future flight schedules, therefore providing a quantifiable demand for flights in the NAS for a range of futures. In addition, new future airline business scenarios are investigated that illustrate when direct flights can replace connecting flights and larger aircraft can be substituted, only when justified by demand.

  6. Research in Distributed Real-Time Systems

    NASA Technical Reports Server (NTRS)

    Mukkamala, R.

    1997-01-01

    This document summarizes the progress we have made on our study of issues concerning the schedulability of real-time systems. Our study has produced several results in the scalability issues of distributed real-time systems. In particular, we have used our techniques to resolve schedulability issues in distributed systems with end-to-end requirements. During the next year (1997-98), we propose to extend the current work to address the modeling and workload characterization issues in distributed real-time systems. In particular, we propose to investigate the effect of different workload models and component models on the design and the subsequent performance of distributed real-time systems.

  7. Power Aware Distributed Systems

    DTIC Science & Technology

    2004-01-01

    detection or threshold functions to trigger the main CPU. The main processor can sleep and either wakeup on a schedule or by a positive threshold event...the RTOS must determine if wake-up latency can be tolerated (or, if it could be hidden by pre- wakeup ). The prediction accuracy for scheduling ...and processor shutdown/ wakeup . This analysis can be used to accurately analyze the schedulability of non-concrete periodic task sets, scheduled using

  8. Wireless Sensor Network Metrics for Real-Time Systems

    DTIC Science & Technology

    2009-05-20

    to compute the probability of end-to-end packet delivery as a function of latency, the expected radio energy consumption on the nodes from relaying... schedules for WSNs. Particularly, we focus on the impact scheduling has on path diversity, using short repeating schedules and Greedy Maximal Matching...a greedy algorithm for constructing a mesh routing topology. Finally, we study the implications of using distributed scheduling schemes to generate

  9. Electric power scheduling: A distributed problem-solving approach

    NASA Technical Reports Server (NTRS)

    Mellor, Pamela A.; Dolce, James L.; Krupp, Joseph C.

    1990-01-01

    Space Station Freedom's power system, along with the spacecraft's other subsystems, needs to carefully conserve its resources and yet strive to maximize overall Station productivity. Due to Freedom's distributed design, each subsystem must work cooperatively within the Station community. There is a need for a scheduling tool which will preserve this distributed structure, allow each subsystem the latitude to satisfy its own constraints, and preserve individual value systems while maintaining Station-wide integrity. The value-driven free-market economic model is such a tool.

  10. Distributive Justice in Higher Education: Perceptions of Administrators

    ERIC Educational Resources Information Center

    Fitzgerald, Shawn M.; Mahony, Daniel; Crawford, Fashaad; Hnat, Hope Bradley

    2014-01-01

    For the study we report here we used the theoretical framework of organizational justice to examine academic administrator's perceptions of resource distribution decisions. We asked deans, school directors, and department chairs in one midwestern state about their perceptions of the fairness and likelihood of use of various distribution principles…

  11. Current Issues and Distributive Justice.

    ERIC Educational Resources Information Center

    Rosal, Lorenca Consuelo

    1992-01-01

    Provides a lesson plan on the issue of distributive justice, or fairness in the ways things are distributed among individuals and groups. Includes a student reading concerning a proposed guaranteed standard of living. Proposes an activity that calls for student discussion of a constitutional amendment that would offer such a guarantee. (SG)

  12. Process evaluation of health fairs promoting cancer screenings.

    PubMed

    Escoffery, Cam; Liang, Shuting; Rodgers, Kirsten; Haardoerfer, Regine; Hennessy, Grace; Gilbertson, Kendra; Heredia, Natalia I; Gatus, Leticia A; Fernandez, Maria E

    2017-12-18

    Low income and uninsured individuals often have lower adherence to cancer screening for breast, cervical and colorectal cancer. Health fairs are a common community outreach strategy used to provide cancer-related health education and services. This study was a process evaluation of seven health fairs focused on cancer screening across the U.S. We conducted key-informant interviews with the fair coordinator and conducted baseline and follow-up surveys with fair participants to describe characteristics of participants as well as their experiences. We collected baseline data with participants at the health fairs and telephone follow-up surveys 6 months following the fair. Attendance across the seven health fairs ranged from 41 to 212 participants. Most fairs provided group or individual education, print materials and cancer screening during the event. Overall, participants rated health fairs as very good and participants reported that the staff was knowledgeable and that they liked the materials distributed. After the fairs, about 60% of participants, who were reached at follow-up, had read the materials provided and had conversations with others about cancer screening, and 41% talked to their doctors about screening. Based on findings from evaluation including participant data and coordinator interviews, we describe 6 areas in planning for health fairs that may increase their effectiveness. These include: 1) use of a theoretical framework for health promotion to guide educational content and activities provided, 2) considering the community characteristics, 3) choosing a relevant setting, 4) promotion of the event, 5) considerations of the types of services to deliver, and 6) evaluation of the health fair. The events reported varied in reach and the participants represented diverse races and lower income populations overall. Most health fairs offered education, print materials and onsite cancer screening. Participants reported general satisfaction with these events and were motivated through their participation to read educational materials or discuss screening with providers. Public health professionals can benefit from this process evaluation and recommendations for designing and evaluating health fairs.

  13. Pricing the Computing Resources: Reading Between the Lines and Beyond

    NASA Technical Reports Server (NTRS)

    Nakai, Junko; Veronico, Nick (Editor); Thigpen, William W. (Technical Monitor)

    2001-01-01

    Distributed computing systems have the potential to increase the usefulness of existing facilities for computation without adding anything physical, but that is realized only when necessary administrative features are in place. In a distributed environment, the best match is sought between a computing job to be run and a computer to run the job (global scheduling), which is a function that has not been required by conventional systems. Viewing the computers as 'suppliers' and the users as 'consumers' of computing services, markets for computing services/resources have been examined as one of the most promising mechanisms for global scheduling. We first establish why economics can contribute to scheduling. We further define the criterion for a scheme to qualify as an application of economics. Many studies to date have claimed to have applied economics to scheduling. If their scheduling mechanisms do not utilize economics, contrary to their claims, their favorable results do not contribute to the assertion that markets provide the best framework for global scheduling. We examine the well-known scheduling schemes, which concern pricing and markets, using our criterion of what application of economics is. Our conclusion is that none of the schemes examined makes full use of economics.

  14. Teaching medical students about fair distribution of healthcare resources

    PubMed Central

    Leget, C; Hoedemaekers, R

    2007-01-01

    Healthcare package decisions are complex. Different judgements about effectiveness, cost‐effectiveness and disease burden influence the decision‐making process. Moreover, different concepts of justice generate different ideas about fair distribution of healthcare resources. This paper presents a decision model that is used in medical school in order to familiarise medical students with the different concepts of justice and the ethical dimension of making concrete choices. The model is based on the four‐stage decision model developed in the Netherlands by the Dunning Committee and the discussion that followed its presentation in 1991. Having to deal with 10 medical services, students working with the model learn to discern and integrate four different ideas of distributive justice that are integrated in a flow chart: libertarian, communitarian, egalitarian and utilitarian. PMID:18055907

  15. Teaching medical students about fair distribution of healthcare resources.

    PubMed

    Leget, C; Hoedemaekers, R

    2007-12-01

    Healthcare package decisions are complex. Different judgements about effectiveness, cost-effectiveness and disease burden influence the decision-making process. Moreover, different concepts of justice generate different ideas about fair distribution of healthcare resources. This paper presents a decision model that is used in medical school in order to familiarise medical students with the different concepts of justice and the ethical dimension of making concrete choices. The model is based on the four-stage decision model developed in the Netherlands by the Dunning Committee and the discussion that followed its presentation in 1991. Having to deal with 10 medical services, students working with the model learn to discern and integrate four different ideas of distributive justice that are integrated in a flow chart: libertarian, communitarian, egalitarian and utilitarian.

  16. Pigeons' Choices between Fixed-Interval and Random-Interval Schedules: Utility of Variability?

    ERIC Educational Resources Information Center

    Andrzejewski, Matthew E.; Cardinal, Claudia D.; Field, Douglas P.; Flannery, Barbara A.; Johnson, Michael; Bailey, Kathleen; Hineline, Philip N.

    2005-01-01

    Pigeons' choosing between fixed-interval and random-interval schedules of reinforcement was investigated in three experiments using a discrete-trial procedure. In all three experiments, the random-interval schedule was generated by sampling a probability distribution at an interval (and in multiples of the interval) equal to that of the…

  17. Faculty Salary Survey. California Community Colleges. 1973-74.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    Data collected in a 1973-74 survey of faculty salaries and fringe benefits for California Community Colleges are provided in three schedules: (1) full-time faculty salary schedule, (2) distribution of salaries for full-time faculty, and (3) fringe benefits for full-time faculty and administrative personnel. The salary schedule for full-time…

  18. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 11: PEP, cost, schedules, and work breakdown structure dictionary

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Cost scheduling and funding data are presented for the reference design of the power extension package. Major schedule milestones are correlated with current Spacelab flight dates. Funding distributions provide for minimum expenditure during the first year of the project.

  19. A new task scheduling algorithm based on value and time for cloud platform

    NASA Astrophysics Data System (ADS)

    Kuang, Ling; Zhang, Lichen

    2017-08-01

    Tasks scheduling, a key part of increasing resource utilization and enhancing system performance, is a never outdated problem especially in cloud platforms. Based on the value density algorithm of the real-time task scheduling system and the character of the distributed system, the paper present a new task scheduling algorithm by further studying the cloud technology and the real-time system: Least Level Value Density First (LLVDF). The algorithm not only introduces some attributes of time and value for tasks, it also can describe weighting relationships between these properties mathematically. As this feature of the algorithm, it can gain some advantages to distinguish between different tasks more dynamically and more reasonably. When the scheme was used in the priority calculation of the dynamic task scheduling on cloud platform, relying on its advantage, it can schedule and distinguish tasks with large amounts and many kinds more efficiently. The paper designs some experiments, some distributed server simulation models based on M/M/C model of queuing theory and negative arrivals, to compare the algorithm against traditional algorithm to observe and show its characters and advantages.

  20. The research on the fairness of carbon emissions for China's energy based on GIS

    NASA Astrophysics Data System (ADS)

    Wang, Qiuxian; Gao, Zhiqiang; Ning, Jicai; Lu, Qingshui; Shi, Runhe; Gao, Wei

    2013-09-01

    This article firstly calculated China's energy carbon emissions of 30 provinces in 2010 with the method of carbon emission inventories of 2006 IPCC based on the data of China energy statistical yearbook, and then calculated its carbon emission intensity with GDP data in China's statistical yearbook. Next according to the formed formula the author calculated the EEI (Economic Efficiency Index) and ECI (Ecological Carrying Index) and made some corresponding figures with the help of GIS to analyze the fairness of the China's energy CO2 emissions in 2010.The results showed that the distribution of China's CO2 emissions for energy in 2010 become lower from the Bohai bay to the surroundings and the west circle provinces are with the lowest energy carbon emissions. The intensity distribution of China's CO2 emissions for energy in 2010 becomes higher from southeast China to north China. The distributions of EEI, ECI and for China's energy CO2 emissions are quite different from each other, and also with their comprehensive result. As to the fairness of China's energy CO2 emissions in 2010, we can say that the south provinces are better than those of Bohai bay areas (except Beijing and Tianjing).

  1. Reliability analysis of component of affination centrifugal 1 machine by using reliability engineering

    NASA Astrophysics Data System (ADS)

    Sembiring, N.; Ginting, E.; Darnello, T.

    2017-12-01

    Problems that appear in a company that produces refined sugar, the production floor has not reached the level of critical machine availability because it often suffered damage (breakdown). This results in a sudden loss of production time and production opportunities. This problem can be solved by Reliability Engineering method where the statistical approach to historical damage data is performed to see the pattern of the distribution. The method can provide a value of reliability, rate of damage, and availability level, of an machine during the maintenance time interval schedule. The result of distribution test to time inter-damage data (MTTF) flexible hose component is lognormal distribution while component of teflon cone lifthing is weibull distribution. While from distribution test to mean time of improvement (MTTR) flexible hose component is exponential distribution while component of teflon cone lifthing is weibull distribution. The actual results of the flexible hose component on the replacement schedule per 720 hours obtained reliability of 0.2451 and availability 0.9960. While on the critical components of teflon cone lifthing actual on the replacement schedule per 1944 hours obtained reliability of 0.4083 and availability 0.9927.

  2. Congestion Avoidance Testbed Experiments. Volume 2

    NASA Technical Reports Server (NTRS)

    Denny, Barbara A.; Lee, Diane S.; McKenney, Paul E., Sr.; Lee, Danny

    1994-01-01

    DARTnet provides an excellent environment for executing networking experiments. Since the network is private and spans the continental United States, it gives researchers a great opportunity to test network behavior under controlled conditions. However, this opportunity is not available very often, and therefore a support environment for such testing is lacking. To help remedy this situation, part of SRI's effort in this project was devoted to advancing the state of the art in the techniques used for benchmarking network performance. The second objective of SRI's effort in this project was to advance networking technology in the area of traffic control, and to test our ideas on DARTnet, using the tools we developed to improve benchmarking networks. Networks are becoming more common and are being used by more and more people. The applications, such as multimedia conferencing and distributed simulations, are also placing greater demand on the resources the networks provide. Hence, new mechanisms for traffic control must be created to enable their networks to serve the needs of their users. SRI's objective, therefore, was to investigate a new queueing and scheduling approach that will help to meet the needs of a large, diverse user population in a "fair" way.

  3. Improved Cloud resource allocation: how INDIGO-DataCloud is overcoming the current limitations in Cloud schedulers

    NASA Astrophysics Data System (ADS)

    Lopez Garcia, Alvaro; Zangrando, Lisa; Sgaravatto, Massimo; Llorens, Vincent; Vallero, Sara; Zaccolo, Valentina; Bagnasco, Stefano; Taneja, Sonia; Dal Pra, Stefano; Salomoni, Davide; Donvito, Giacinto

    2017-10-01

    Performing efficient resource provisioning is a fundamental aspect for any resource provider. Local Resource Management Systems (LRMS) have been used in data centers for decades in order to obtain the best usage of the resources, providing their fair usage and partitioning for the users. In contrast, current cloud schedulers are normally based on the immediate allocation of resources on a first-come, first-served basis, meaning that a request will fail if there are no resources (e.g. OpenStack) or it will be trivially queued ordered by entry time (e.g. OpenNebula). Moreover, these scheduling strategies are based on a static partitioning of the resources, meaning that existing quotas cannot be exceeded, even if there are idle resources allocated to other projects. This is a consequence of the fact that cloud instances are not associated with a maximum execution time and leads to a situation where the resources are under-utilized. These facts have been identified by the INDIGO-DataCloud project as being too simplistic for accommodating scientific workloads in an efficient way, leading to an underutilization of the resources, a non desirable situation in scientific data centers. In this work, we will present the work done in the scheduling area during the first year of the INDIGO project and the foreseen evolutions.

  4. KSC01pp0637

    NASA Image and Video Library

    2001-03-27

    Workers on Launch Pad 17-A, Cape Canaveral Air Force Station, get ready to move the Mars Odyssey spacecraft into the clean room at the top of the gantry. There it will be mated encased by the fairing of the Delta II rocket already in place. The spacecraft will map the Martian surface in search of geological features that could indicate the presence of water, now or in the past, and may contribute significantly toward understanding what will be necessary for a more sophisticated exploration of Mars. Launch is scheduled for 11:02 a.m. EDT April 7

  5. KSC-99pp0719

    NASA Image and Video Library

    1999-06-19

    Workers in the launch tower at Launch Pad 17A, Cape Canaveral Air Station, help guide the first segment of the fairing around NASA's Far Ultraviolet Spectroscopic Explorer (FUSE) satellite. The satellite is scheduled for launch June 24 aboard a Boeing Delta II rocket. FUSE is designed to scour the cosmos for the fossil record of the origins of the universe hydrogen and deuterium. Scientists will use FUSE to study those elements to unlock the secrets of how galaxies evolve and to discover what the Universe was like when it was only a few minutes old

  6. KSC-99pp0722

    NASA Image and Video Library

    1999-06-19

    At Launch Pad 17A, Cape Canaveral Air Station, NASA's Far Ultraviolet Spectroscopic Explorer (FUSE) satellite (foreground) is partially covered by half of the fairing (behind it) that will protect it during launch. The satellite is scheduled for launch June 24 aboard a Boeing Delta II rocket. FUSE is designed to scour the cosmos for the fossil record of the origins of the universe hydrogen and deuterium. Scientists will use FUSE to study those elements to unlock the secrets of how galaxies evolve and to discover what the Universe was like when it was only a few minutes old

  7. KSC-97DC1283

    NASA Image and Video Library

    1997-08-19

    Workers make final checks as the second part of the bi-sector payload fairing for the Advanced Composition Explorer (ACE) is closed around the spacecraft at Launch Complex 17A, Cape Canaveral Air Station. ACE will be launched on a Boeing Delta II expendable launch vehicle. The spacecraft will investigate the origin and evolution of solar phenomenon, the formation of solar corona, solar flares and acceleration of the solar wind. This will be the second Delta launch under the Boeing name and the first from Cape Canaveral. Liftoff is scheduled Aug. 24

  8. OA-7 Lift and Mate to Booster

    NASA Image and Video Library

    2017-03-17

    United Launch Alliance (ULA) technicians monitor the progress as the payload fairing containing the Orbital ATK Cygnus pressurized cargo module is lowered onto the Centaur upper stage, or second stage, of the ULA Atlas V rocket in the Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop the Atlas V from pad 41. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  9. TDRS-M Spacecraft Encapsulation

    NASA Image and Video Library

    2017-08-02

    Inside the Astrotech facility in Titusville, Florida, NASA's Tracking and Data Relay Satellite, TDRS-M, is encapsulated into ULA's Atlas V payload fairing. TDRS-M is the latest spacecraft destined for the agency's constellation of communications satellites that allows nearly continuous contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. Liftoff atop a United Launch Alliance Atlas V rocket is scheduled to take place from Space Launch Complex 41 at Cape Canaveral Air Force Station at 8:03 a.m. EDT Aug. 18, 2017.

  10. OA-7 Cargo Module Installation onto KAMAG

    NASA Image and Video Library

    2017-03-15

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians use a crane to lift the Orbital ATK Cygnus pressurized cargo module, enclosed in its payload fairing, for transfer to a KAMAG transporter. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  11. OA-7 Lift and Mate to Booster

    NASA Image and Video Library

    2017-03-17

    The payload fairing containing the Orbital ATK Cygnus pressurized cargo module is lifted by crane at the United Launch Alliance (ULA) Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The payload will be hoisted up and mated to the ULA Atlas V rocket. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop the Atlas V from pad 41. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  12. Atlas_V_OA-7_Payload_Mate_to_Booster

    NASA Image and Video Library

    2017-03-17

    The payload fairing containing the Orbital ATK Cygnus pressurized cargo module is lifted and mated onto the Centaur upper stage, or second stage, of the United Launch Alliance (ULA) rocket in the Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop the Atlas V from pad 41. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  13. OA-7 Lift and Mate to Booster

    NASA Image and Video Library

    2017-03-17

    The payload fairing containing the Orbital ATK Cygnus pressurized cargo module is hoisted up by crane at the United Launch Alliance (ULA) Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The payload will be mated to the ULA Atlas V rocket. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop the Atlas V from pad 41. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  14. KSC-02pd0890

    NASA Image and Video Library

    2002-06-05

    KENNEDY SPACE CENTER, FLA. -- At Launch Complex 17-A, Cape Canaveral Air Force Station, one half of the fairing of the Delta II rocket for encapsulation of the Comet Nucleus Tour (CONTOUR) spacecraft is lifted up the tower. CONTOUR will provide the first detailed look into the heart of a comet -- the nucleus. Flying as close as 60 miles (100 kilometers) to at least two comets, the spacecraft will take the sharpest pictures yet of a nucleus while analyzing the gas and dust that surround them. Launch of CONTOUR is scheduled for July 1, 2002

  15. Grid Computing at GSI for ALICE and FAIR - present and future

    NASA Astrophysics Data System (ADS)

    Schwarz, Kilian; Uhlig, Florian; Karabowicz, Radoslaw; Montiel-Gonzalez, Almudena; Zynovyev, Mykhaylo; Preuss, Carsten

    2012-12-01

    The future FAIR experiments CBM and PANDA have computing requirements that fall in a category that could currently not be satisfied by one single computing centre. One needs a larger, distributed computing infrastructure to cope with the amount of data to be simulated and analysed. Since 2002, GSI operates a tier2 center for ALICE@CERN. The central component of the GSI computing facility and hence the core of the ALICE tier2 centre is a LSF/SGE batch farm, currently split into three subclusters with a total of 15000 CPU cores shared by the participating experiments, and accessible both locally and soon also completely via Grid. In terms of data storage, a 5.5 PB Lustre file system, directly accessible from all worker nodes is maintained, as well as a 300 TB xrootd-based Grid storage element. Based on this existing expertise, and utilising ALICE's middleware ‘AliEn’, the Grid infrastructure for PANDA and CBM is being built. Besides a tier0 centre at GSI, the computing Grids of the two FAIR collaborations encompass now more than 17 sites in 11 countries and are constantly expanding. The operation of the distributed FAIR computing infrastructure benefits significantly from the experience gained with the ALICE tier2 centre. A close collaboration between ALICE Offline and FAIR provides mutual advantages. The employment of a common Grid middleware as well as compatible simulation and analysis software frameworks ensure significant synergy effects.

  16. Implementation and use of a highly available and innovative IaaS solution: the Cloud Area Padovana

    NASA Astrophysics Data System (ADS)

    Aiftimiei, C.; Andreetto, P.; Bertocco, S.; Biasotto, M.; Dal Pra, S.; Costa, F.; Crescente, A.; Dorigo, A.; Fantinel, S.; Fanzago, F.; Frizziero, E.; Gulmini, M.; Michelotto, M.; Sgaravatto, M.; Traldi, S.; Venaruzzo, M.; Verlato, M.; Zangrando, L.

    2015-12-01

    While in the business world the cloud paradigm is typically implemented purchasing resources and services from third party providers (e.g. Amazon), in the scientific environment there's usually the need of on-premises IaaS infrastructures which allow efficient usage of the hardware distributed among (and owned by) different scientific administrative domains. In addition, the requirement of open source adoption has led to the choice of products like OpenStack by many organizations. We describe a use case of the Italian National Institute for Nuclear Physics (INFN) which resulted in the implementation of a unique cloud service, called ’Cloud Area Padovana’, which encompasses resources spread over two different sites: the INFN Legnaro National Laboratories and the INFN Padova division. We describe how this IaaS has been implemented, which technologies have been adopted and how services have been configured in high-availability (HA) mode. We also discuss how identity and authorization management were implemented, adopting a widely accepted standard architecture based on SAML2 and OpenID: by leveraging the versatility of those standards the integration with authentication federations like IDEM was implemented. We also discuss some other innovative developments, such as a pluggable scheduler, implemented as an extension of the native OpenStack scheduler, which allows the allocation of resources according to a fair-share based model and which provides a persistent queuing mechanism for handling user requests that can not be immediately served. Tools, technologies, procedures used to install, configure, monitor, operate this cloud service are also discussed. Finally we present some examples that show how this IaaS infrastructure is being used.

  17. Ethical Dilemmas in Protecting Susceptible Subpopulations From Environmental Health Risks: Liberty, Utility, Fairness, and Accountability for Reasonableness

    PubMed Central

    Resnik, David B.; MacDougall, D. Robert; Smith, Elise M.

    2018-01-01

    Various U.S. laws, such as the Clean Air Act and the Food Quality Protection Act, require additional protections for susceptible subpopulations who face greater environmental health risks. The main ethical rationale for providing these protections is to ensure that environmental health risks are distributed fairly. In this article, we (1) consider how several influential theories of justice deal with issues related to the distribution of environmental health risks; (2) show that these theories often fail to provide specific guidance concerning policy choices; and (3) argue that an approach to public decision making known as accountability for reasonableness can complement theories of justice in establishing acceptable environmental health risks for the general population and susceptible subpopulations. Since accountability for reasonableness focuses on the fairness of the decision-making process, not the outcome, it does not guarantee that susceptible subpopulations will receive a maximum level of protection, regardless of costs or other morally relevant considerations. PMID:29466133

  18. An unsettled bargain? Mothers’ perceptions of justice and fairness in paid work

    PubMed Central

    Yerkes, Mara A.; Martin, Bill; Baxter, Janeen; Rose, Judy

    2017-01-01

    Mothers’ return to work following childbirth is widely recognized as a key stage in establishing employment arrangements that disadvantage them in the long run. This article investigates why mothers accept these unequal arrangements using data from a qualitative study of 109 Australian mothers. It focuses on mothers’ perceptions of the fairness and justice of the flexibility of arrangements they commonly enter into upon return to work. The article draws attention to the importance of different justice frameworks, distributive, procedural and interactional, in understanding women’s acceptance of gender inequality in paid work. The results indicate that most mothers view their workplace arrangements as fair, consistent with a distributive justice framework. Many women also place great importance on interactional justice, particularly in their experiences in negotiating flexibility. The article also identifies differences across employment type with women in jobs with career prospects more likely to invoke interactional justice frameworks than women in jobs with few career prospects. PMID:28690425

  19. Native Amazonian Children Forego Egalitarianism in Merit-Based Tasks When They Learn to Count

    ERIC Educational Resources Information Center

    Jara-Ettinger, Julian; Gibson, Edward; Kidd, Celeste; Piantadosi, Steve

    2016-01-01

    Cooperation often results in a final material resource that must be shared, but deciding how to distribute that resource is not straightforward. A distribution could count as fair if all members receive an equal reward ("egalitarian distributions"), or if each member's reward is proportional to their merit ("merit-based…

  20. Optimizing Power–Frequency Droop Characteristics of Distributed Energy Resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guggilam, Swaroop S.; Zhao, Changhong; Dall Anese, Emiliano

    This paper outlines a procedure to design power-frequency droop slopes for distributed energy resources (DERs) installed in distribution networks to optimally participate in primary frequency response. In particular, the droop slopes are engineered such that DERs respond in proportion to their power ratings and they are not unfairly penalized in power provisioning based on their location in the distribution network. The main contribution of our approach is that a guaranteed level of frequency regulation can be guaranteed at the feeder head, while ensuring that the outputs of individual DERs conform to some well-defined notion of fairness. The approach we adoptmore » leverages an optimization-based perspective and suitable linearizations of the power-flow equations to embed notions of fairness and information regarding the physics of the power flows within the distribution network into the droop slopes. Time-domain simulations from a differential algebraic equation model of the 39-bus New England test-case system augmented with three instances of the IEEE 37-node distribution-network with frequency-sensitive DERs are provided to validate our approach.« less

  1. Artificial Immune Algorithm for Subtask Industrial Robot Scheduling in Cloud Manufacturing

    NASA Astrophysics Data System (ADS)

    Suma, T.; Murugesan, R.

    2018-04-01

    The current generation of manufacturing industry requires an intelligent scheduling model to achieve an effective utilization of distributed manufacturing resources, which motivated us to work on an Artificial Immune Algorithm for subtask robot scheduling in cloud manufacturing. This scheduling model enables a collaborative work between the industrial robots in different manufacturing centers. This paper discussed two optimizing objectives which includes minimizing the cost and load balance of industrial robots through scheduling. To solve these scheduling problems, we used the algorithm based on Artificial Immune system. The parameters are simulated with MATLAB and the results compared with the existing algorithms. The result shows better performance than existing.

  2. KSC-2014-2872

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – The lid is removed from the transportation trailer containing a half section of the 10-foot-diameter fairing for NASA's Soil Moisture Active Passive mission, or SMAP, in the Building 836 high bay on south Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/U.S. Air Force 30th Space Wing

  3. KSC-2014-3460

    NASA Image and Video Library

    2014-08-07

    VANDENBERG AIR FORCE BASE, Calif. – Preparations are underway to transport a half section of the 10-foot-diameter fairing for NASA's Soil Moisture Active Passive mission, or SMAP, from the Horizontal Integration Facility to the nearby mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for no earlier than November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  4. KSC-2014-2873

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers prepare to lift a half section of the 10-foot-diameter fairing for NASA's Soil Moisture Active Passive mission, or SMAP, from a transportation trailer in the Building 836 high bay on south Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/U.S. Air Force 30th Space Wing

  5. KSC-2014-2874

    NASA Image and Video Library

    2014-06-03

    VANDENBERG AIR FORCE BASE, Calif. – Workers attach a half section of the 10-foot-diameter fairing for NASA's Soil Moisture Active Passive mission, or SMAP, to an overhead crane to lift it from a transportation trailer in the Building 836 high bay on south Vandenberg Air Force Base in California. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket from Space Launch Complex 2. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/U.S. Air Force 30th Space Wing

  6. KSC-2014-3471

    NASA Image and Video Library

    2014-08-07

    VANDENBERG AIR FORCE BASE, Calif. – A half section of the 10-foot-diameter fairing for NASA's Soil Moisture Active Passive mission, or SMAP, is transferred into the environmental enclosure at the top of the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California where it will be stowed until arrival of the spacecraft. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for no earlier than November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  7. KSC-2014-3470

    NASA Image and Video Library

    2014-08-07

    VANDENBERG AIR FORCE BASE, Calif. – A half section of the 10-foot-diameter fairing for NASA's Soil Moisture Active Passive mission, or SMAP, is hoisted to the top of the mobile service tower at Space Launch Complex 2 on Vandenberg Air Force Base in California where it will be transferred into the environmental enclosure and stowed until arrival of the spacecraft. The fairing will protect the SMAP spacecraft from the heat and aerodynamic pressure generated during its ascent to orbit aboard a United Launch Alliance Delta II rocket. SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data will also be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for no earlier than November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov. Photo credit: NASA/Randy Beaudoin

  8. KSC-00pp0750

    NASA Image and Video Library

    2000-06-13

    In the Spacecraft Assembly and Encapsulation Facility, the Tracking and Data Relay Satellite (TDRS-H) at left is ready for encapsulation. Workers in an extendable platform wait for the fairing (right) to move into place. After encapsulation in the fairing, TDRS will be transported to Launch Pad 36A, Cape Canaveral Air Force Station for launch scheduled June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit

  9. KSC-00pp0714

    NASA Image and Video Library

    2000-06-01

    The logo for the Tracking and Data Relay Satellite (TDRS-H) is predominantly displayed on the fairing that will encapsulate the satellite for launch. The fairing is in KSC’s Spacecraft Assembly and Encapsulation Facility (SAEF-2) where TDRS is undergoing testing. The TDRS is scheduled to be launched from CCAFS June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit

  10. KSC00pp0714

    NASA Image and Video Library

    2000-06-01

    The logo for the Tracking and Data Relay Satellite (TDRS-H) is predominantly displayed on the fairing that will encapsulate the satellite for launch. The fairing is in KSC’s Spacecraft Assembly and Encapsulation Facility (SAEF-2) where TDRS is undergoing testing. The TDRS is scheduled to be launched from CCAFS June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit

  11. KSC-00pp0749

    NASA Image and Video Library

    2000-06-13

    In the Spacecraft Assembly and Encapsulation Facility, the Tracking and Data Relay Satellite (TDRS-H) at right sits while one-half of the fairing (left) is moved closer to it. After encapsulation in the fairing, TDRS will be transported to Launch Pad 36A, Cape Canaveral Air Force Station for launch scheduled June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit

  12. KSC00pp0749

    NASA Image and Video Library

    2000-06-13

    In the Spacecraft Assembly and Encapsulation Facility, the Tracking and Data Relay Satellite (TDRS-H) at right sits while one-half of the fairing (left) is moved closer to it. After encapsulation in the fairing, TDRS will be transported to Launch Pad 36A, Cape Canaveral Air Force Station for launch scheduled June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit

  13. KSC00pp0750

    NASA Image and Video Library

    2000-06-13

    In the Spacecraft Assembly and Encapsulation Facility, the Tracking and Data Relay Satellite (TDRS-H) at left is ready for encapsulation. Workers in an extendable platform wait for the fairing (right) to move into place. After encapsulation in the fairing, TDRS will be transported to Launch Pad 36A, Cape Canaveral Air Force Station for launch scheduled June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit

  14. Dynamic Bandwidth Allocation with Effective Utilization of Polling Interval over WDM/TDM PON

    NASA Astrophysics Data System (ADS)

    Ni, Cuiping; Gan, Chaoqin; Gao, Ziyue

    2014-12-01

    WDM/TDM (wavelength-division multiplexing/time-division multiplexing) PON (passive optical network) appears to be an attractive solution for the next generation optical access networks. Dynamic bandwidth allocation (DBA) plays a crucial role in efficiently and fairly allocating the bandwidth among all users in WDM/TDM PON. In this paper, two dynamic bandwidth allocation schemes (DBA1 and DBA2) are proposed to eliminate the idle time of polling cycles (i.e. polling interval), improve bandwidth utilization and make full use of bandwidth resources. The two DBA schemes adjust the time slot of sending request information and make fair scheduling among users to achieve the effective utilization of polling interval in WDM/TDM PON. The simulation and theoretical analyses verify that the proposed schemes outperform the conventional DBA scheme. We also make comparisons between the two schemes in terms of bandwidth utilization and average packet delay to further demonstrate the effectiveness of the scheme of DBA2.

  15. TESS SpaceX Fairing Halves Lift to Vertical; Payload Encapsulation

    NASA Image and Video Library

    2018-04-08

    Technicians prepare NASA's Transiting Exoplanet Survey Satellite (TESS) for encapsulation in the SpaceX payload fairing inside the Payload Hazardous Servicing Facility at the agency's Kennedy Space Center in Florida. The satellite is scheduled to launch atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station on April 16. The satellite is the next step in NASA's search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and Space Research serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s Ames Research Center, the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management.

  16. Delta II ICESat-2 Fairing Cleaning and Sampling

    NASA Image and Video Library

    2018-04-06

    On Friday, April 6, 2018, in NASA’s Building 8337 at Vandenberg Air Force Base in California, a technician cleans and takes samples from the payload fairing the will protect NASA's Ice, Cloud and land Elevation Satellite-2, or ICESat-2, satellite during launch. Liftoff atop a United Launch Alliance Delta II rocket is scheduled for Sept. 12, 2018, from Space Launch Complex-2 at Vandenberg. It will be the last for the venerable Delta II rocket. ICESat-2, which is being built and tested by Orbital ATK in Gilbert, Arizona, will carry a single instrument called the Advanced Topographic Laser Altimeter System, or ATLAS. The ATLAS instrument is being built and tested at NASA’s Goddard Space Flight Center in Greenbelt Maryland. Once in orbit, the satellite is designed to measure the height of a changing Earth, one laser pulse at a time, 10,000 laser pulses a second. ICESat-2 will help scientists investigate why, and how much, Earth’s frozen and icy areas, called the cryosphere, are changing.

  17. Delta II ICESat-2 Fairing Cleaning and Sampling

    NASA Image and Video Library

    2018-04-06

    On Friday, April 6, 2018, in NASA’s Building 8337 at Vandenberg Air Force Base in California, technicians and engineers clean and take samples from the payload fairing the will protect NASA's Ice, Cloud and land Elevation Satellite-2, or ICESat-2, satellite during launch. Liftoff atop a United Launch Alliance Delta II rocket is scheduled for Sept. 12, 2018, from Space Launch Complex-2 at Vandenberg. It will be the last for the venerable Delta II rocket. ICESat-2, which is being built and tested by Orbital ATK in Gilbert, Arizona, will carry a single instrument called the Advanced Topographic Laser Altimeter System, or ATLAS. The ATLAS instrument is being built and tested at NASA’s Goddard Space Flight Center in Greenbelt Maryland. Once in orbit, the satellite is designed to measure the height of a changing Earth, one laser pulse at a time, 10,000 laser pulses a second. ICESat-2 will help scientists investigate why, and how much, Earth’s frozen and icy areas, called the cryosphere, are changing.

  18. Delta II ICESat-2 Fairing Cleaning and Sampling

    NASA Image and Video Library

    2018-04-06

    On Friday, April 6, 2018, in NASA’s Building 8337 at Vandenberg Air Force Base in California, technicians and engineers check samples during cleaning of the payload fairing that will protect NASA's Ice, Cloud and land Elevation Satellite-2, or ICESat-2, satellite during launch. Liftoff atop a United Launch Alliance Delta II rocket is scheduled for Sept. 12, 2018, from Space Launch Complex-2 at Vandenberg. It will be the last for the venerable Delta II rocket. ICESat-2, which is being built and tested by Orbital ATK in Gilbert, Arizona, will carry a single instrument called the Advanced Topographic Laser Altimeter System, or ATLAS. The ATLAS instrument is being built and tested at NASA’s Goddard Space Flight Center in Greenbelt Maryland. Once in orbit, the satellite is designed to measure the height of a changing Earth, one laser pulse at a time, 10,000 laser pulses a second. ICESat-2 will help scientists investigate why, and how much, Earth’s frozen and icy areas, called the cryosphere, are changing.

  19. Scheduling from the perspective of the application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berman, F.; Wolski, R.

    1996-12-31

    Metacomputing is the aggregation of distributed and high-performance resources on coordinated networks. With careful scheduling, resource-intensive applications can be implemented efficiently on metacomputing systems at the sizes of interest to developers and users. In this paper we focus on the problem of scheduling applications on metacomputing systems. We introduce the concept of application-centric scheduling in which everything about the system is evaluated in terms of its impact on the application. Application-centric scheduling is used by virtually all metacomputer programmers to achieve performance on metacomputing systems. We describe two successful metacomputing applications to illustrate this approach, and describe AppLeS scheduling agentsmore » which generalize the application-centric scheduling approach. Finally, we show preliminary results which compare AppLeS-derived schedules with conventional strip and blocked schedules for a two-dimensional Jacobi code.« less

  20. A Mechanism for Fair Distribution of Resources without Payments.

    PubMed

    Christoforou, Evgenia; Anta, Antonio Fernández; Santos, Agustín

    2016-01-01

    We design a mechanism for Fair and Efficient Distribution of Resources (FEDoR) in the presence of strategic agents. We consider a multiple-instances, Bayesian setting, where in each round the preference of an agent over the set of resources is a private information. We assume that in each of r rounds n agents are competing for k non-identical indivisible goods, (n > k). In each round the strategic agents declare how much they value receiving any of the goods in the specific round. The agent declaring the highest valuation receives the good with the highest value, the agent with the second highest valuation receives the second highest valued good, etc. Hence we assume a decision function that assigns goods to agents based on their valuations. The novelty of the mechanism is that no payment scheme is required to achieve truthfulness in a setting with rational/strategic agents. The FEDoR mechanism takes advantage of the repeated nature of the framework, and through a statistical test is able to punish the misreporting agents and be fair, truthful, and socially efficient. FEDoR is fair in the sense that, in expectation over the course of the rounds, all agents will receive the same good the same amount of times. FEDoR is an eligible candidate for applications that require fair distribution of resources over time. For example, equal share of bandwidth for nodes through the same point of access. But further on, FEDoR can be applied in less trivial settings like sponsored search, where payment is necessary and can be given in the form of a flat participation fee. FEDoR can be a good candidate in a setting like that to solve the problem of starvation of publicity slots for some advertisers that have a difficult time determining their true valuations. To this extent we perform a comparison with traditional mechanisms applied to sponsored search, presenting the advantage of FEDoR.

Top