DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
2008-10-01
This document constitutes an addendum to the July 2003, Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Closure Report for Corrective Action Unit 357: Mud Pits and Waste Dump, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, thismore » addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 04-26-03, Lead Bricks. This UR was established as part of FFACO corrective actions and was based on the presence of lead contamination at concentrations greater than the action level established at the time of the initial investigation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction (UR) Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the URmore » Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-23-17, Contaminated Wash (Parcel H). This UR was established as part of FFACO corrective actions and was based on the presence of total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level at the time of the initial investigation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with themore » UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.« less
The principles and operating procedures for the National Environmental Laboratory Accreditation Conference (NELAC) are contained in the NELAC Constitution and Bylaws. The major portion of this document (standards) contains detailed requirements for accrediting environmental labo...
Vulnerability Analyst’s Guide to Geometric Target Description
1992-09-01
not constitute indorsement of any commercial product. Form Approved REPORT DOCUMENTATION PAGE OMB No. 0704-O,8 public reporting burden for this...46 5.3 Surrogacy ..............................................46 5.4 Specialized Targets......................................46 5.5... commercially available documents for other large-scale software. The documentation is not a BRL technical report, but can be obtained by contacting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pagesmore » of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title,more » and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2001, Corrective Action Decision Document / Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 22-99-05, Fuel Storage Area. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Calibration, Verification and Application of a Two-Dimensional Flow Model.
1983-09-01
report are not to be construed as an official Department of the Army position unless so designated by other athorized documents. The contents of this... report are not to be used for advertising, publication. or promotional purposes. Citation of trade names does not constitute an official 6hdorsement...or approval of the use of such commercial products. Unclassified SECURITY CLASSIFICATION o THIS PAGE ("O~en Dato Ene_ _ _ REPORT DOCUMENTATION PAGE AD
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1999, Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-05-002-SW02, Septic Waste System • CAS 03-05-002-SW06, Septic Waste System These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2000, Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 23-56-01, Former Mercury Fire Training Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
[Recommendations for the control of documents and the establishment of a documentary system].
Vinner, E
2013-06-01
The quality management system that must be implemented in a MBL to meet the requirements of the standard NF EN ISO 15189 is based, among other things, on the creation and use by staff of a documentary system approved and updated. This documentary system is constituted by external documents (standards, suppliers' documents...) and internal documents (quality manual, procedures, instructions, technical and quality recordings...). A procedure of the documentary system control must be formalized. The documentary system should be modeled in order to identify the various procedures to be drafted and the incurred risks in the case a document would be missing in this system. Each document must be indexed in a unique way and document management must be carried out rigorously. The use of document management software is a great help to manage the life cycle of documents.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the January 2004, Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 20-23-02, Postshot Cellar • CAS 20-23-03, Cellar • CAS 20-23-04, Postshot Cellar • CAS 20-23-05, Postshot Cellar • CAS 20-23-06, Cellar • CAS 20-37-01, Cellar & Mud Pit • CAS 20-37-05, Cellar These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
A Modular Framework for 3 Way Electrochromic Switches
2017-09-01
Department of the Army position unless so designated by other authorized documents. Citation of manufacturer’s or trade names does not constitute an...spectroscopy, molecular design 44 B Christopher Rinderspacher 410-306-2811Unclassified Unclassified Unclassified UU ii Approved for public release...Deprotonated spectral data compared for lowest energy conformer. Superscripts N and D denote the neutral and deprotonated values, respectively
Solution Deposition Methods for Carbon Nanotube Field-Effect Transistors
2009-06-01
authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of the use thereof. Destroy...processed into FETs using standard microelectronics processing techniques. The resulting devices were characterized using a semiconductor parameter...method will help to determine which conditions are useful for producing CNT devices for chemical sensing and electronic applications. 15. SUBJECT TERMS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the March 2000, Corrective Action Decision Document / Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points (TTR) as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. Themore » approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-51-001-0355 – Photo Shop UDP, Drains in CAU 429. It should be noted that there are no changes to CAU 406. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2004, Closure Report for Corrective Action Unit 271, Areas 25, 26, and 27 Septic Systems as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS 27-05-02, Leachfield. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on an “Occasional Use Area” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 400 total work hours). Any proposed activity within this use restricted area that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining postings at this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Electrospun Fibers for Composites Applications
2014-02-01
so designated by other authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of...and tensile testing . While the nanofibers did not dramatically stiffen the resulting composites, they provided insight as to the impact of the...of suitable fiber mats for this study limited the scope and accessibility of test specimens, the results from the examination of fiber-matrix
2018-03-30
ARL-TR-8336 ● MAR 2018 US Army Research Laboratory Manipulating the Geometric Computer-aided Design of the Operational...so designated by other authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of...Army Research Laboratory Manipulating the Geometric Computer-aided Design of the Operational Requirements-based Casualty Assessment Model within
Development and Verification of Body Armor Target Geometry Created Using Computed Tomography Scans
2017-07-13
designated by other authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of...modeling consisted of manual measurement of armor systems and translating those measurements to computer-aided design geometry, which can be tedious and...computer-aided design (CAD) human geometry model (referred to throughout as ORCA man) that is used in the Operational Requirement-based Casualty Assessment
Laboratory Evaluation of Nitrile Fuel Tank Materials (Phase 2)
2013-09-01
NOTICES Disclaimers The findings in this report are not to be construed as an official Department of the Army position unless so designated...by other authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of the use...thereof. Destroy this report when it is no longer needed. Do not return it to the originator. Army Research Laboratory Aberdeen Proving Ground, MD
Verification and Validation of Rural Propagation in the Sage 2.0 Simulation
2016-08-01
position unless so designated by other authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or...Approved for public release; distribution unlimited. 1 1. Introduction The System of Systems Survivability Simulation (S4) is designed to be...materiel developers. The Sage model, part of the S4 simulation suite, has been developed primarily to support SLAD analysts in pretest planning and
Effects on Fuel Consumption and Diesel Engine Deposits from Nano-Particle Oil Additive
2010-07-01
Disclaimers The findings in this report are not to be construed as an official Department of the Army position unless so designated by other...authorized documents. Trade names cited in this report do not constitute an official endorsement or approval of the use of such commercial hardware or...software. DTIC Availability Notice Qualified requestors may obtain copies of this report from the Defense Technical Information Center
Lightweight, Durable Army Antennas Using Carbon Nanotube Technology
2013-01-01
may be adjusted by collecting the sheet on a revolving substrate conveyor belt (e.g., Teflon belt ), as shown in figure 15 (12). SEM images of the... designated by other authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of the use...CNT) materials to produce lightweight, flexible, and durable alternatives to existing and future Army antenna designs is explored through fabrication
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS TA-03-001-TARC Roller Coaster Lagoons. This UR was established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and was based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This reevaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR for CAS TA-03-001-TARC to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS TA-03-001-TARC Roller Coaster Lagoons • CAS TA-21-001-TARC Roller Coaster N. Disposal Trench These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify these URs to administrative URs. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). These Administrative URs were based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2003, Closure Report for Corrective Action Unit 355: Area 2 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 02-37-01, Cellar & Mud Pit • CAS 02-37-03, Cellar & Mud Pit • CAS 02-37-04, Cellar & Mud Pit • CAS 02-37-05, Cellar & Mud Pit • CAS 02-37-06, Cellar & Mud Pit • CAS 02-37-07, Cellar & Mud Pit • CAS 02-37-10, Cellar & Mud Pit • CAS 02-37-11, Cellar & Mud Pit • CAS 02-37-12, Cellar & Mud Pit • CAS 02-37-13, Cellar & Mud Pit • CAS 02-37-14, Cellar & Mud Pit • CAS 02-37-15, Cellar & Mud Pit • CAS 02-37-16, Cellar & Mud Pit • CAS 02-37-17, Cellar • CAS 02-37-18, Cellar & Tanks These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
2017-07-31
promotional purposes. Citation of trade names does not constitute an official endorsement or approval of the use of such commercial products. All product...15 Figure 7. Breeding home range polygons of Double-Crested Cormorant movements from Baker’s Lake (blue outline) and the TNC Emiquon Preserve (red...48 ERDC/EL TR-17-12 v Figure B1. 95% kernel home range polygons for 14 breeding cormorants from Baker’s Lake, May 26 - July 12
Software Interface Assessment of the Centralized Aviation Flight Records System (CAFRS) 4.0
2015-05-01
administrator based on the role of the user needing the permission. Within CAFRS, some permissions are grouped into common roles based on job...simplify. Ex: “Compl RL3 ref tng – Designated RL2 D/N, RL3 Night Vision Goggles (NVG)”. • Once entry is made on 7122 initial and signed and remark... designated by other authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of the use
2009-09-01
by other authorized documents. Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of the use thereof...burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense...22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply
2007-10-01
report are not to be used for advertising, publication, or promotional purposes. Citation of trade names does not constitute an official endorsement...or approval of the use of such commercial products. All product names and trademarks cited are the property of their respective owners. The findings...of this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents. DESTROY
Code of Federal Regulations, 2014 CFR
2014-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
Code of Federal Regulations, 2013 CFR
2013-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
Code of Federal Regulations, 2012 CFR
2012-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
Sumathipala, Athula; Siribaddana, Sisira; Hewege, Suwin; Lekamwattage, Manura; Athukorale, Manjula; Siriwardhana, Chesmal; Murray, Joanna; Prince, Martin
2008-01-01
Background International guidelines on research have focused on protecting research participants. Ethical Research Committee (ERC) approval and informed consent are the cornerstones. Externally sponsored research requires approval through ethical review in both the host and the sponsoring country. This study aimed to determine to what extent ERC approval and informed consent procedures are documented in locally and internationally published human subject research carried out in Sri Lanka. Methods We obtained ERC approval in Sri Lanka and the United Kingdom. Theses from 1985 to 2005 available at the Postgraduate Institute of Medicine (PGIM) library affiliated to the University of Colombo were scrutinised using checklists agreed in consultation with senior research collaborators. A Medline search was carried out with MeSH major and minor heading 'Sri Lanka' as the search term for international publications originating in Sri Lanka during 1999 to 2004. All research publications from CMJ during 1999 to 2005 were also scrutinized. Results Of 291 theses, 34% documented ERC approvals and 61% documented obtaining consent. From the international journal survey, 250 publications originated from Sri Lanka of which only 79 full text original research publications could be accessed electronically. Of these 38% documented ERC approval and 39% documented obtaining consent. In the Ceylon Medical Journal 36% documented ERC approval and 37% documented obtaining consent. Conclusion Only one third of the publications scrutinized recorded ERC approval and procurement of informed consent. However, there is a positive trend in documenting these ethical requirements in local postgraduate research and in the local medical journal. PMID:18267015
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Application for approval of exchange of Certificate of Documentation requiring mortgagee consent. 67.509 Section 67.509 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DOCUMENTATION AND MEASUREMENT OF VESSELS DOCUMENTATION OF VESSELS Fees § 67.509 Application for approval of exchange of...
Code of Federal Regulations, 2011 CFR
2011-04-01
... of proceeding and scoping document, or of approval to use traditional licensing process or... PROCESS § 5.8 Notice of commencement of proceeding and scoping document, or of approval to use traditional... required under § 5.5, filing of the pre-application document pursuant to § 5.6, and filing of any request...
Code of Federal Regulations, 2011 CFR
2011-07-01
... construct and install facilities under my approved COP? 285.632 Section 285.632 Mineral Resources BUREAU OF... Requirements Activities Under An Approved Cop § 285.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to MMS the documents listed in the following...
Code of Federal Regulations, 2010 CFR
2010-10-01
... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...
This page contains the Final Approval Document, Response to Public Comments and Draft Approval Issued for Public Comment for the Approval to Dispose of Less than 50 Parts Per Million Polychlorinated Biphenyl Remediation Waste Issued to USWAG
Constitutional Provisions on the Press: A World View.
ERIC Educational Resources Information Center
Paraschos, Manny
A study examined the legal treatment of the press in constitutions or other basic legal institutional documents from around the world. Sixty-three constitutions or basic documents from the Western World, the Communist Bloc, the Middle East, Africa, Southeast Asia, and Latin America were analyzed. Analysis revealed that most constitutions open with…
25 CFR 81.5 - Request to call election.
Code of Federal Regulations, 2013 CFR
2013-04-01
... election to adopt a constitution and bylaws or to revoke a constitution and bylaws, upon a request from the tribal government. (b) The Secretary shall authorize the calling of an election to adopt a constitution... ratification, however, shall be valid unless the tribe has a constitution adopted and approved pursuant to the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biebesheimer, E.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.
1989-01-01
This Peruvian Resolution approves the Manual on the Constitution and Functions of the Reforestation Committee, to be used by all reforestation committees administering reforestation funds. The Manual contains provisions relating to the laws governing reforestation, the structure and functions of reforestation committees, the funding sources for reforestation, methods of achieving reforestation, and contracts and agreements, among other things.
14 CFR 77.2 - Definition of terms.
Code of Federal Regulations, 2011 CFR
2011-01-01
... approach system is planned and is so indicated by an FAA approved airport layout plan; a military service approved military airport layout plan; any other FAA planning document, or military service military... layout plan, a military service approved military airport layout plan, or by any planning document...
50 CFR 300.186 - Completed and approved documents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Completed and approved documents. 300.186 Section 300.186 Wildlife and Fisheries INTERNATIONAL FISHING AND RELATED ACTIVITIES INTERNATIONAL FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species...
50 CFR 300.186 - Completed and approved documents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 9 2011-10-01 2011-10-01 false Completed and approved documents. 300.186 Section 300.186 Wildlife and Fisheries INTERNATIONAL FISHING AND RELATED ACTIVITIES INTERNATIONAL FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species...
7 CFR 1423.6 - Financial information documentation requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... CORPORATION APPROVED WAREHOUSES § 1423.6 Financial information documentation requirements. To be approved under this part, a warehouse operator shall submit a current financial statement at the time of... 7 Agriculture 10 2010-01-01 2010-01-01 false Financial information documentation requirements...
40 CFR 35.2050 - Effect of approval or certification of documents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2011 CFR
2011-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2013 CFR
2013-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2014 CFR
2014-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2012 CFR
2012-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
40 CFR 125.99 - What are approved design and construction technologies?
Code of Federal Regulations, 2010 CFR
2010-07-01
... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...
22 CFR 64.10 - Grant not to constitute a gift.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Grant not to constitute a gift. 64.10 Section... EMPLOYEES IN CULTURAL EXCHANGE PROGRAMS OF FOREIGN COUNTRIES § 64.10 Grant not to constitute a gift. A grant made under an approved program shall not constitute a gift for purposes of 22 CFR 10.735-203 and...
7 CFR 1737.92 - Loan documents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Loan documents. 1737.92 Section 1737.92 Agriculture... PRE-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED TELECOMMUNICATIONS LOANS Final Loan Approval Procedures § 1737.92 Loan documents. Following approval of the loan, RUS shall forward the...
15 CFR 280.101 - Petitions for approval of documents.
Code of Federal Regulations, 2012 CFR
2012-01-01
... accredited third party may petition the Director, NIST, to approve such document for use as described in...: FQA Document Certification, NIST, 100 Bureau Drive, Gaithersburg, MD 20899. (3) The Director, NIST... information to allow the Director, NIST, to make this determination. (b) Accreditation. (1) A person...
15 CFR 280.101 - Petitions for approval of documents.
Code of Federal Regulations, 2011 CFR
2011-01-01
... accredited third party may petition the Director, NIST, to approve such document for use as described in...: FQA Document Certification, NIST, 100 Bureau Drive, Gaithersburg, MD 20899. (3) The Director, NIST... information to allow the Director, NIST, to make this determination. (b) Accreditation. (1) A person...
15 CFR 280.101 - Petitions for approval of documents.
Code of Federal Regulations, 2013 CFR
2013-01-01
... accredited third party may petition the Director, NIST, to approve such document for use as described in...: FQA Document Certification, NIST, 100 Bureau Drive, Gaithersburg, MD 20899. (3) The Director, NIST... information to allow the Director, NIST, to make this determination. (b) Accreditation. (1) A person...
15 CFR 280.101 - Petitions for approval of documents.
Code of Federal Regulations, 2014 CFR
2014-01-01
... accredited third party may petition the Director, NIST, to approve such document for use as described in...: FQA Document Certification, NIST, 100 Bureau Drive, Gaithersburg, MD 20899. (3) The Director, NIST... information to allow the Director, NIST, to make this determination. (b) Accreditation. (1) A person...
15 CFR 280.101 - Petitions for approval of documents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... accredited third party may petition the Director, NIST, to approve such document for use as described in...: FQA Document Certification, NIST, 100 Bureau Drive, Gaithersburg, MD 20899. (3) The Director, NIST... information to allow the Director, NIST, to make this determination. (b) Accreditation. (1) A person...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What supporting documents must be provided prior to BIA's....213 What supporting documents must be provided prior to BIA's grant or approval of an agricultural... organizational and financial documents, as needed to show that the lease will be enforceable against the tenant...
40 CFR 725.60 - Withdrawal of submission by the submitter.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., OPPT Document Control Office (DCO), EPA East Bldg., 1201 Constitution Ave., NW., Rm. 6428, Washington... Control Office (DCO), EPA East Bldg., 1201 Constitution Ave., NW., Rm. 6428, Washington, DC 20004. (ii... Document Control Office (DCO), EPA East Bldg., 1201 Constitution Ave., NW., Rm. 6428, Washington, DC 20004...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Testimony and production of documents prohibited... Relating to Public Welfare (Continued) CORPORATION FOR NATIONAL AND COMMUNITY SERVICE PRODUCTION OR... and production of documents prohibited unless approved by appropriate Corporation officials. (a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Testimony and production of documents... DEPARTMENT OF STATE ACCESS TO INFORMATION SERVICE OF PROCESS; PRODUCTION OR DISCLOSURE OF OFFICIAL... § 172.4 Testimony and production of documents prohibited unless approved by appropriate Department...
28 CFR 20.23 - Documentation: Approval by OJARS.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Local Criminal History Record Information Systems § 20.23 Documentation: Approval by OJARS. Within 90... description of State policy on dissemination of criminal history record information. (c) Six months after the...
28 CFR 20.23 - Documentation: Approval by OJARS.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Local Criminal History Record Information Systems § 20.23 Documentation: Approval by OJARS. Within 90... description of State policy on dissemination of criminal history record information. (c) Six months after the...
28 CFR 20.23 - Documentation: Approval by OJARS.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Local Criminal History Record Information Systems § 20.23 Documentation: Approval by OJARS. Within 90... description of State policy on dissemination of criminal history record information. (c) Six months after the...
28 CFR 20.23 - Documentation: Approval by OJARS.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Local Criminal History Record Information Systems § 20.23 Documentation: Approval by OJARS. Within 90... description of State policy on dissemination of criminal history record information. (c) Six months after the...
28 CFR 20.23 - Documentation: Approval by OJARS.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Local Criminal History Record Information Systems § 20.23 Documentation: Approval by OJARS. Within 90... description of State policy on dissemination of criminal history record information. (c) Six months after the...
From Confederation to Constitution: 1781-1789.
ERIC Educational Resources Information Center
Urofsky, Melvin I.; Cox, Nancy
Students should achieve a higher level of understanding and appreciation of the evolving nature of the U.S. Constitution and its relevance to contemporary societal issues by studying historical documents from the period of time between the Articles of Confederation and the Constitution. This document begins with a history of that period and of the…
Code of Federal Regulations, 2010 CFR
2010-01-01
... 6 Domestic Security 1 2010-01-01 2010-01-01 false Testimony and production of documents prohibited... in Litigation § 5.44 Testimony and production of documents prohibited unless approved by appropriate... or request, including in connection with any litigation, provide oral or written testimony by...
75 FR 10182 - Approval and Promulgation of Implementation Plans; State of Iowa
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... INFORMATION: Throughout this document ``we,'' ''us,'' or ``our'' refer to the EPA. Table of Contents I. What is being addressed in this document? II. What revisions is EPA approving? III. What action is EPA taking? IV. Statutory and Executive Order Reviews I. What is being addressed in this document? The State...
[Local approval procedures act as a brake on RCTs].
van der Stok, E P; Huiskens, J; Hemmes, B; Grünhagen, D J; van Gulik, T M; Verhoef, C; Punt, C J A
2016-01-01
Large multicentre randomised controlled trials (RCTs) in the Netherlands are increasingly being impeded by major differences between local approval procedures. However, no national agenda exists as yet to improve this situation. The existence of major local differences in processing time and documentation required has been reported previously but little is known about the costs incurred and whether or not specific certifications and research contracts are mandatory. The current study evaluated these aspects of local procedures for obtaining approval of two oncological multicentre RCTs. Retrospective, descriptive. All local procedures for obtaining approval of two randomised clinical trials were evaluated: the CAIRO5 and CHARISMA trials initiated by the Dutch Colorectal Cancer Group (DCCG). We objectified time between approval by the Medical Ethics Review Committee (METC) and final approval by the Board of Directors (RvB), the type and number of documents needed, and costs charged. The median time interval between the approval by the Medical Ethics Review Committee and the approval by the Board of Directors was 90 days (range 4-312). The number of documents required per centre ranged from 6-20. The costs charged ranged from € 0-€ 1750, and amounted to € 8575 for all procedures combined. No costs were charged by the majority of the centres. The approval procedures for multicentre clinical trials in the Netherlands demonstrate major differences. Processing times, documentation required and costs are unpredictable; greater uniformity is highly desirable in this context.
Defense Industrial Base Assessment: U.S. Space Industry
2007-08-31
Approved for public release; distribution is unlimited. Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release, distribution unlimited 13. SUPPLEMENTARY NOTES The original document contains color...profitability and a refusal of some foreign customers to procure equipment that requires U.S. ITAR licensing.” The BIS survey addressed
Pache, G; Saueressig, U; Baumann, T; Dürselen, L; Langer, M; Kotter, E
2008-06-01
Evaluation of the impact of a new, dynamic computer-aided quality manual application (QMA) regarding the acceptance and efficiency of a quality management system (QMS) according to DIN EN ISO 9001:2000. The QMA combines static pages of HTML with active content generated from an underlying database. Through user access rights, a hierarchy is defined to create and administer quality documents. Document workflow, feedback management and employee survey were analyzed to compare the performance of the new QMH with the formerly used static version. Integration of a document editor and automated document re-approval accelerated the document process by an average of 10 min. In spite of an increase of the yearly document changes of 60%, the administration effort was reduced by approximately 160 h. Integration of the feedback management system into the QMA decreased handling time from an average of 16.5 to 3.4 days. Simultaneously the number of feedback messages increased from 160 in 2005 to 306 in 2006. Employee satisfaction was raised (old: 3.19+/-1.02, new: 1.91+/-0.8). The number of users who partook in the QMA more than once a week also increased from 29.5% to 60%. The computer-aided quality manual application constitutes the basis for the success of our QMS. The possibility to actively participate in the quality management process has led to broad acceptance and usage by the employees. The administration effort was able to be tremendously decreased as compared to conventional QMS.
25 CFR 162.528 - What documents are required for BIA approval of a WEEL?
Code of Federal Regulations, 2013 CFR
2013-04-01
... LEASES AND PERMITS Wind and Solar Resource Leases Weel Approval § 162.528 What documents are required for... required by § 162.527; (d) Statement from the appropriate tribal authority that the proposed use is in... environmental and land use requirements, including any documentation prepared under § 162.027(b); (f) An...
25 CFR 162.563 - What documents are required for BIA approval of a WSR lease?
Code of Federal Regulations, 2013 CFR
2013-04-01
... WATER LEASES AND PERMITS Wind and Solar Resource Leases Wsr Lease Approval § 162.563 What documents are... authority that the proposed use is in conformance with applicable tribal law, if required by the tribe; (g... applicable Federal and tribal environmental and land use requirements, including any documentation prepared...
25 CFR 162.528 - What documents are required for BIA approval of a WEEL?
Code of Federal Regulations, 2014 CFR
2014-04-01
... LEASES AND PERMITS Wind and Solar Resource Leases Weel Approval § 162.528 What documents are required for... required by § 162.527; (d) Statement from the appropriate tribal authority that the proposed use is in... environmental and land use requirements, including any documentation prepared under § 162.027(b); (f) An...
25 CFR 162.563 - What documents are required for BIA approval of a WSR lease?
Code of Federal Regulations, 2014 CFR
2014-04-01
... WATER LEASES AND PERMITS Wind and Solar Resource Leases Wsr Lease Approval § 162.563 What documents are... authority that the proposed use is in conformance with applicable tribal law, if required by the tribe; (g... applicable Federal and tribal environmental and land use requirements, including any documentation prepared...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT... performance appraisal systems and requires the Office of Personnel Management (OPM) to prescribe regulations... Management Plan approved by OPM as of September 22, 1995 shall constitute an approved performance appraisal...
Code of Federal Regulations, 2010 CFR
2010-07-01
... construct and install facilities under my approved COP? 285.632 Section 285.632 Mineral Resources MINERALS... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop... COP? (a) You must submit to MMS the documents listed in the following table: ER29AP09.124 (b) You must...
The Future of U.S.-India Naval Relations
2017-02-01
Cleared for Public Release DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited. The Future of U.S.-India...STATEMENT A. Approved for public release: distribution unlimited. PUBLIC RELEASE. 2/1/2017 Other requests for this document shall be referred to...DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per
Reflective Light Modulation by Cephalopods and Fishes in Shallow Nearshore Habitats
2009-01-01
cephalopods and fish to document (a) speed of body patterning changes and (b) the range of microhabitats that they encounter 1 DISTRIBUTION STATEMENT A...Approved for public release; distribution is unlimited. Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the...11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION /AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13
Spectral Characterization of RDX, ETN, PETN, TATP, HMTD, HMX, and C-4 in the Mid-Infrared Region
2014-04-01
Samuels Joseph A. Domanico Joseph May Ronald W. Miles, Jr. Augustus W. Fountain III RESEARCH AND TECHNOLOGY DIRECTORATE April 2014 Approved for public ...position unless so designated by other authorizing documents. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting...AVAILABILITY STATEMENT Approved for public release; distribution is unlimited. 13. SUPPLEMENTARY NOTES *Science Applications International Corporation
Monitored Geologic Repository Project Description Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
P. M. Curry
2001-01-30
The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing formore » the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).« less
Epstein, Richard A
2011-01-01
The Biologics Price Competition and Innovation Act of 2009 ("Biosimilars Act") is for the field of pharmaceutical products the single most important legislative development since passage of the Drug Price Competition and Patent Term Restoration Act of 1984 ("Hatch-Waxman Act"), on which portions of the Biosimilars Act are clearly patterned. Congress revised section 351 of the Public Health Service Act (PHSA) to create a pathway for FDA approval of "biosimilar" biological products. Each biosimilar applicant is required to cite in its application a "reference product" that was approved on the basis of a full application containing testing data and manufacturing information, which is owned and was submitted by another company and much of which constitutes trade secret information subject to constitutional protection. Because the Biosimilars Act authorizes biosimilar applicants to cite these previously approved applications, the implementation of the new legislative scheme raises critical issues under the Fifth Amendment of the Constitution, pursuant to which private property--trade secrets included--may not be taken for public use, without "just compensation." FDA must confront those issues as it implements the scheme set out in the Biosimilars Act. This article will discuss these issues, after providing a brief overview of the Biosimilars Act and a more detailed examination of the law of trade secrets.
Embryo adoption: Some further considerations
Patterson, Colin
2015-01-01
Recent discussions of embryo adoption have sought to make sense of the teaching of the Congregation for the Doctrine of the Faith (CDF) document Dignitas personae which appeared to provide a negative judgment on such a practice. This article aims to provide a personalist account of the process of fertilization and implantation that might serve as the basis for the negative judgment of the CDF document. In doing so, it relies upon the idea that a person, including an embryo, is not to be considered in isolation, but always in relation to God and to others. This approach extends the substantialist conceptualizations commonly employed in discussions of this issue. More generally, the article seeks to highlight the value of a personalist re-framing for an understanding of the moral questions surrounding the beginning of life. Lay summary: This article seeks to make sense of what appears to be a clear-cut rejection, set out in the Congregation for the Doctrine of the Faith (CDF) document Dignitas personae, of the proposal for women to “adopt” surplus frozen embryos. It draws upon more recently developed modes of philosophical/theological reasoning to argue that, in human procreation, both fertilization and implantation represent constitutive dimensions of divine creative activity and so must be protected from manipulative technological intervention. Since embryo adoption requires this kind of technology, it makes sense for the Church document not to approve it. PMID:25698841
Embryo adoption: Some further considerations.
Patterson, Colin
2015-02-01
Recent discussions of embryo adoption have sought to make sense of the teaching of the Congregation for the Doctrine of the Faith (CDF) document Dignitas personae which appeared to provide a negative judgment on such a practice. This article aims to provide a personalist account of the process of fertilization and implantation that might serve as the basis for the negative judgment of the CDF document. In doing so, it relies upon the idea that a person, including an embryo, is not to be considered in isolation, but always in relation to God and to others. This approach extends the substantialist conceptualizations commonly employed in discussions of this issue. More generally, the article seeks to highlight the value of a personalist re-framing for an understanding of the moral questions surrounding the beginning of life. Lay summary: This article seeks to make sense of what appears to be a clear-cut rejection, set out in the Congregation for the Doctrine of the Faith (CDF) document Dignitas personae, of the proposal for women to "adopt" surplus frozen embryos. It draws upon more recently developed modes of philosophical/theological reasoning to argue that, in human procreation, both fertilization and implantation represent constitutive dimensions of divine creative activity and so must be protected from manipulative technological intervention. Since embryo adoption requires this kind of technology, it makes sense for the Church document not to approve it.
NASA Astrophysics Data System (ADS)
Dabkowska, Hanna A.
2017-06-01
The International Organization for Crystal Growth (IOCG) Executive Committee, Council and General Assembly met in the week 7-12 August 2016. Participation quorum was achieved at all the meetings. The following changes in the Constitution, already approved at ICCGE-17 for the second time, were moved to be presented to the IOCG General Assembly for the third and final approval. 7.a The International Conference on Crystal Growth, ICCG is renamed to the International Conference on Crystal Growth and Epitaxy (ICCGE) and all references to ICCG in the constitution and By-laws are changed to ICCGE. 7.b The IOCG Constitution is amended such that Article III Section 1 will read as "The Executive Committee shall consist of the five Officers, the Past President, the Chairman or Chairmen of the past ICCGE the Chairman or Chairmen of the next ICCGE and up to ten additional members elected by the Council." 7.c The IOCG Constitution is amended such that Article IV Section 1 includes the sentence: "The Council may also include ex-officio members as described in the Bylaws" There was no change to the Bylaws. All provisional amendments are included in the IOCG Constitution and Bylaws with different text colors. The amendments that were approved for the third time and are definitive are inserted with no special color as part of standard text.
14 CFR 121.915 - Continuing qualification curriculum.
Code of Federal Regulations, 2010 CFR
2010-01-01
... in all tasks, procedures and subjects required in accordance with the approved program documentation, as follows: (i) For pilots in command, seconds in command, and flight engineers, First Look in accordance with the certificate holder's FAA-approved program documentation. (ii) For pilots in command...
Clean Water Act Approved Total Maximum Daily Load (TMDL) Documents
Information from Approved and Established TMDL Documents as well as TMDLs that have been Withdrawn. This includes the pollutants identified in the TMDL Document, the 303(d) Listed Water(s) that the TMDL Document addresses and the associated Cause(s) of Impairment. The National Total Maximum Daily Load (TMDL) Tracking System (NTTS) contains information on waters that are Not Supporting their designated uses. These waters are listed by the state as impaired under Section 303(d) of the Clean Water Act.
TSO C-129 approvals and anticipated approvals
DOT National Transportation Integrated Search
2001-01-01
This document contains a table of the approvals and anticipated approvals of TSO-C129a equipment (the technical standard order (TSO) for Airborne Supplemental Navigation Equipment Using the Global Positioning System (GPS)). This TSO prescribes the mi...
2016-10-01
DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited The views, opinions and/or findings contained in this report are those of the...documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1...5012 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for Public Release; Distribution Unlimited 13
8 CFR 1244.18 - Issuance of charging documents; detention.
Code of Federal Regulations, 2010 CFR
2010-01-01
... seek such a waiver in deportation or exclusion proceedings. The charging document shall constitute... JUSTICE IMMIGRATION REGULATIONS TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 1244.18... of deportation or exclusion against an alien granted Temporary Protected Status shall constitute a...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
...-Regulatory Organizations; Municipal Securities Rulemaking Board; Order Granting Approval of Proposed Rule Change Consisting of Establishment of a Subscription to Historical Information and Documents Submitted to... historical information and documents submitted to the MSRB's Short-Term Obligation Rate Transparency System...
Documents About the Approval to Dispose of Less than 50 Parts Per Million (ppm) Polychlorinated Biphenyl (PCB) Remediation Waste Issued to National Rural Electric Cooperative Association (NRECA) Members
46 CFR 175.800 - Approved equipment and material.
Code of Federal Regulations, 2011 CFR
2011-10-01
... required by this subchapter to be approved or of an approved type, must have been manufactured and approved... Accepted under Marine Inspection and Navigation Laws” lists approved equipment by type and manufacturer. COMDTINST M16714.3 (Series) may be obtained from New Orders, Superintendent of Documents, P.O. Box 371954...
46 CFR 175.800 - Approved equipment and material.
Code of Federal Regulations, 2010 CFR
2010-10-01
... required by this subchapter to be approved or of an approved type, must have been manufactured and approved... Accepted under Marine Inspection and Navigation Laws” lists approved equipment by type and manufacturer. COMDTINST M16714.3 (Series) may be obtained from New Orders, Superintendent of Documents, P.O. Box 371954...
49 CFR 236.1037 - Records retention.
Code of Federal Regulations, 2010 CFR
2010-10-01
... railroad shall: (1) Report the inconsistency in writing by mail, facsimile, e-mail, or hand delivery to the... approved Type Approval, if any, PTCDP, and PTCSP that it holds; (2) Adequate documentation to demonstrate..., DC 20590, within 15 days of discovery. Documents that are hand delivered must not be enclosed in an...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-31
... techniques or other forms of information technology, e.g., permitting electronic submission of responses... information collected will be used for performance, risk, trend and other analyses. Agency form numbers, if... Information Collection: Comment Request; Condominium Project Approval Document Collection AGENCY: Office of...
48 CFR 13.501 - Special documentation requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Special documentation... officer's knowledge and belief will serve as approval, unless a higher approval level is established in..., Sept. 30, 2005; 71 FR 57360, 57366, Sept. 28, 2006; 75 FR 34276, June 16, 2010; 75 FR 53132, Aug. 30...
Connected vehicle pilot deployment program phase 1 : human use approval summary – Tampa.
DOT National Transportation Integrated Search
2016-07-18
This document presents the Human Use Approval (HUA) Summary for the THEA Connected Vehicle (CV) Pilot Deployment. The purpose of this report is to document the process used by THEA in the Tampa CV Pilot Deployment as required in Phase 1, Task 8 in pr...
45 CFR 307.15 - Approval of advance planning documents for computerized support enforcement systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... computerized support enforcement systems. 307.15 Section 307.15 Public Welfare Regulations Relating to Public... CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES COMPUTERIZED SUPPORT ENFORCEMENT SYSTEMS § 307.15 Approval of advance planning documents for computerized support enforcement systems. (a...
42 CFR 495.326 - Disallowance of FFP.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., requirements, and other undertakings described in the approved HIT planning advance planning document and HIT implementation advance planning document to the detriment of the proper and efficient operation of the Medicaid program, payment of FFP may be disallowed. In the case of a suspension of approval of a HIT planning...
5 CFR 1655.13 - Loan approval and issuance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... by the participant to the TSP record keeper, together with any documentation required to be submitted, the loan will be initially approved or denied by the TSP record keeper based upon the requirements of... required supporting documentation, was received by the TSP record keeper before the expiration date...
Naci, Huseyin; Wouters, Olivier J; Gupta, Radhika; Ioannidis, John P A
2017-06-01
Policy Points: Randomized trials-the gold standard of evaluating effectiveness-constitute a small minority of existing evidence on agents given accelerated approval. One-third of randomized trials are in therapeutic areas outside of FDA approval and less than half evaluate the therapeutic benefits of these agents but use them instead as common backbone treatments. Agents receiving accelerated approval are often tested concurrently in several therapeutic areas. For most agents, no substantial time lag is apparent between the average start dates of randomized trials evaluating their effectiveness and those using them as part of background therapies. There appears to be a tendency for therapeutic agents receiving accelerated approval to quickly become an integral component of standard treatment, despite potential shortcomings in their evidence base. Therapeutic agents treating serious conditions are eligible for Food and Drug Administration (FDA) accelerated approval. The clinical evidence accrued on agents receiving accelerated approval has not been systematically evaluated. Our objective was to assess the timing and characteristics of available studies. We first identified clinical studies of novel therapeutic agents receiving accelerated approval. We then (1) categorized those studies as randomized or nonrandomized, (2) explored whether they evaluated the FDA-approved indications, and (3) documented the available treatment comparisons. We also meta-analyzed the difference in start times between randomized studies that (1) did or did not evaluate approved indications and (2) were or were not designed to evaluate the agent's effectiveness. In total, 37 novel therapeutic agents received accelerated approval between 2000 and 2013. Our search of ClinicalTrials.gov identified 7,757 studies, which included 1,258,315 participants. Only one-third of identified studies were randomized controlled trials. Of 1,631 randomized trials with advanced recruitment status, 906 were conducted in therapeutic areas for which agents received initial accelerated approval, 202 were in supplemental indications, and 523 were outside approved indications. Only 411 out of 906 (45.4%) trials were designed to test the effectiveness of agents that received accelerated approval ("evaluation" trials); others used these agents as common background treatment in both arms ("background" trials). There was no detectable lag between average start times of trials conducted within and outside initially approved indications. Evaluation trials started on average 1.52 years (95% CI: 0.87 to 2.17) earlier than background trials. Cumulative evidence on agents with accelerated approvals has major limitations. Most clinical studies including these agents are small and nonrandomized, and about a third are conducted in unapproved areas, typically concurrently with those conducted in approved areas. Most randomized trials including these therapeutic agents are not designed to directly evaluate their clinical benefits but to incorporate them as standard treatment. © 2017 Milbank Memorial Fund.
40 CFR 310.23 - How will EPA rank approved requests?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., 88-NE-SC, 88-W-SC, 88-WNC-SC, March 1990. The Director of the Federal Register has approved this... Bureau of the Census, Office of Public Affairs, Department of Commerce, Constitution Avenue, NE...: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. (c) Larger...
40 CFR 310.23 - How will EPA rank approved requests?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., 88-NE-SC, 88-W-SC, 88-WNC-SC, March 1990. The Director of the Federal Register has approved this... Bureau of the Census, Office of Public Affairs, Department of Commerce, Constitution Avenue, NE...: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. (c) Larger...
40 CFR 310.23 - How will EPA rank approved requests?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., 88-NE-SC, 88-W-SC, 88-WNC-SC, March 1990. The Director of the Federal Register has approved this... Bureau of the Census, Office of Public Affairs, Department of Commerce, Constitution Avenue, NE...: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. (c) Larger...
Vouchers--A Legal Draw. A Response to Benjamin Dowling-Sendor.
ERIC Educational Resources Information Center
Underwood, Julie
1999-01-01
A court-approved Milwaukee voucher program permits up to 15% of the city's public schoolchildren to attend private/religious schools at state expense. This represents no victory for vouchers. Although the Wisconsin Supreme Court found vouchers constitutional, it may not believe they are valid under the federal constitution. (MLH)
NASA Astrophysics Data System (ADS)
Bargo, Paulo R.; Jacques, Steven L.
2001-07-01
The FDA has approved PDT using Photofrin for certain esophageal and lung cancers, specifying an approved prescription of administered drug (mg/kg body weight) and administered light (J/linear cm of cylindrical fiber). This paper describes our development of a multi-optical fiber catheter for endoscopic use which documents the drug accumulated in the target tissues and the light penetration into the target tissues. The catheter uses reflectance to specify the light penetration depth and uses reflectance- corrected fluorescence to document drug accumulation. The goal is to document the variation in drug and light received by patients who are administered the FDA-approved prescription.
Educators' Handbook on Federal Anti-Sex Discrimination Laws.
ERIC Educational Resources Information Center
Mercer, James
The document presents a summary of major federal legislation affecting the policy and operation of educational programs and activities. The handbook is intended to help educators locate information on the constitutional aspects of anti-discrimination laws. The document is presented in four chapters. Chapter I discusses the constitutional aspects…
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the...-Governance Tribe? (a) The Secretary shall review and approve planning documents to ensure compliance with... design documents for general compliance with requirements of the construction project agreement. (b) The...
NASA Technical Reports Server (NTRS)
Muhsin, Mansour; Walters, Ian
2004-01-01
The Document Concurrence System is a combination of software modules for routing users expressions of concurrence with documents. This system enables determination of the current status of concurrences and eliminates the need for the prior practice of manually delivering paper documents to all persons whose approvals were required. This system runs on a server, and participants gain access via personal computers equipped with Web-browser and electronic-mail software. A user can begin a concurrence routing process by logging onto an administration module, naming the approvers and stating the sequence for routing among them, and attaching documents. The server then sends a message to the first person on the list. Upon concurrence by the first person, the system sends a message to the second person, and so forth. A person on the list indicates approval, places the documents on hold, or indicates disapproval, via a Web-based module. When the last person on the list has concurred, a message is sent to the initiator, who can then finalize the process through the administration module. A background process running on the server identifies concurrence processes that are overdue and sends reminders to the appropriate persons.
Leonard, Elizabeth Weeks
2009-01-01
On May 2, 2006, a divided panel of the U.S. Court of Appeals for the District of Columbia, in a startling opinion, Abigail Alliance for Better Access to Developmental Drugs v. Eschenbach, held that terminally ill patients who have exhausted all other available options have a constitutional right to experimental treatment that FDA has not yet approved. Although ultimately overturned by the full court, Abigail Alliance generated considerable interest from various constituencies. Meanwhile, FDA proposed similar regulatory amendments, as have lawmakers on both sides of the aisle in Congress. But proponents of expanded access fail to consider public health and consumer safety concerns. In particular, allowing patients to try unproven treatments, outside of controlled clinical trials risks both the study's outcome and the health of patients who might benefit from the deliberate, careful process of new drug approval as it currently operates under FDA's auspices.
Power: Constitutional Update. Bar/School Partnership Programs Series.
ERIC Educational Resources Information Center
American Bar Association, Chicago, IL. Special Committee on Youth Education for Citizenship.
The fourth in a special series of handbooks dealing with constitutional themes, this document looks at power in the context of the U.S. Constitution. "The Constitution's Prescription for Freedom" (L. Peach) examines the separation of powers provided for in the Constitution. "The Concept of Power" (C. Roach) is a series of…
29 CFR 1956.2 - General policies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... appropriate order, or the bill or a draft of legislation that will be or has been proposed for enactment shall... requirements of the Act and this part in a manner consistent with the State's constitution and laws. (2) On the..., or becomes approved after approval of a plan under this part, the developmental period applicable to...
29 CFR 1956.2 - General policies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... appropriate order, or the bill or a draft of legislation that will be or has been proposed for enactment shall... requirements of the Act and this part in a manner consistent with the State's constitution and laws. (2) On the..., or becomes approved after approval of a plan under this part, the developmental period applicable to...
29 CFR 1956.2 - General policies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... appropriate order, or the bill or a draft of legislation that will be or has been proposed for enactment shall... requirements of the Act and this part in a manner consistent with the State's constitution and laws. (2) On the..., or becomes approved after approval of a plan under this part, the developmental period applicable to...
29 CFR 1956.2 - General policies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... appropriate order, or the bill or a draft of legislation that will be or has been proposed for enactment shall... requirements of the Act and this part in a manner consistent with the State's constitution and laws. (2) On the..., or becomes approved after approval of a plan under this part, the developmental period applicable to...
29 CFR 1956.2 - General policies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... appropriate order, or the bill or a draft of legislation that will be or has been proposed for enactment shall... requirements of the Act and this part in a manner consistent with the State's constitution and laws. (2) On the..., or becomes approved after approval of a plan under this part, the developmental period applicable to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-12
... approve South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... Rule 317, an equivalent alternative program, is not less stringent than the program required by section... equivalent alternative programs, and, if so, whether Rule 317 would constitute an approvable equivalent...
7 CFR 802.1 - Qualified laboratories.
Code of Federal Regulations, 2010 CFR
2010-01-01
... certification program having auditing capability is automatically approved by the Service. (2) Any county or... calibration is approved by the Service. The State approval may be documented by a certificate or letter. The.... (Approved by the Office of Management and Budget under control number 0580-0011) [51 FR 7052, Feb. 28, 1986...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING PRODUCTS REQUIREMENTS FOR THE APPROVAL OF FLAME-RESISTANT CONVEYOR BELTS General Provisions § 14.2... manufactures or controls the production of a conveyor belt and applies to MSHA for approval of conveyor belt... conveyor belt as approved. Extension of approval. A document issued by MSHA, which states that a change to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-02
...] User Fees and Refunds for Premarket Approval Applications and Device Biologics License Applications... availability of the guidance entitled ``User Fees and Refunds for Premarket Approval Applications (PMAs) and... for single copies of the guidance document entitled ``User Fees and Refunds for Premarket Approval...
29 CFR 1903.2 - Posting of notice; availability of the Act, regulations and applicable standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... has an approved poster informing employees of their protections and obligations as defined in § 1952.10 of this chapter, such poster, when posted by employers covered by the State plan, shall constitute...) Reproductions or facsimiles of such Federal or State posters shall constitute compliance with the posting...
29 CFR 1903.2 - Posting of notice; availability of the Act, regulations and applicable standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... has an approved poster informing employees of their protections and obligations as defined in § 1952.10 of this chapter, such poster, when posted by employers covered by the State plan, shall constitute...) Reproductions or facsimiles of such Federal or State posters shall constitute compliance with the posting...
29 CFR 1903.2 - Posting of notice; availability of the Act, regulations and applicable standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... has an approved poster informing employees of their protections and obligations as defined in § 1952.10 of this chapter, such poster, when posted by employers covered by the State plan, shall constitute...) Reproductions or facsimiles of such Federal or State posters shall constitute compliance with the posting...
29 CFR 1903.2 - Posting of notice; availability of the Act, regulations and applicable standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... has an approved poster informing employees of their protections and obligations as defined in § 1952.10 of this chapter, such poster, when posted by employers covered by the State plan, shall constitute...) Reproductions or facsimiles of such Federal or State posters shall constitute compliance with the posting...
29 CFR 1903.2 - Posting of notice; availability of the Act, regulations and applicable standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... has an approved poster informing employees of their protections and obligations as defined in § 1952.10 of this chapter, such poster, when posted by employers covered by the State plan, shall constitute...) Reproductions or facsimiles of such Federal or State posters shall constitute compliance with the posting...
U.S. Coast Guard Patrol Boat (WPB) Planning Hull Feasibility Study.
1984-12-01
and they do not constitute a standard, specification, or regulation. This report, or portions thereof may not be used for advertisinq or sales ... promotion purposes. Citation of trade names and manufacturers does not constitute endorsement or approval of such products. IL :.I It’ Ili I I ., ’a a
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conover, David R.
The purpose of this document is to identify laws, rules, model codes, codes, standards, regulations, specifications (CSR) related to safety that could apply to stationary energy storage systems (ESS) and experiences to date securing approval of ESS in relation to CSR. This information is intended to assist in securing approval of ESS under current CSR and to identification of new CRS or revisions to existing CRS and necessary supporting research and documentation that can foster the deployment of safe ESS.
Mahomoodally, M. Fawzi; Sreekeesoon, D. Priyamka
2014-01-01
The pediatric population constitutes the most vulnerable patients due to a dearth of approved drugs. Consequently, there is a pressing need to probe novel natural pharmacological agents in an endeavour to develop new drugs to address pediatric illnesses. To date, no studies have explored the use of natural therapies for pediatric health care in Mauritius. Parents (n = 325) from different regions of the island were interviewed. Quantitative indexes such as fidelity level (FL), informant consensus factor (F IC), and use-value (UV) were calculated. Thirty-two plants were reported to be used by pediatric patients. Gastrointestinal disorders (F IC = 0.97) encompassing regurgitation, infantile colic, and stomach aches were the most common ailments managed with herbs. Matricaria chamomilla used for infantile colic and its pharmacological properties has previously been documented for pediatric patients. Product from A. mellifera (UV = 0.75) was the most utilized zootherapy for managing cough. Most plants and animal products reported in this study have bioactive constituents supported by existing scientific literature but their use for the pediatric population is scant. The present ethnopharmacological study has opened new perspectives for further research into their pharmacology, which can subsequently support and facilitate timely pediatric medicinal product development. PMID:24949418
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-19
... regulatory authority under the Clean Air Act. DATES: EPA's decision approving the Tribes' TAS application was... Decision Document, Attachment 1 (Legal Analysis of the Wind River Indian Reservation Boundary), Attachment... decision to approve the application does not approve, Tribal authority to implement any Clean Air Act...
Minimizing Reflectivity by Etching Microstructures in Mercury Cadmium Telluride (HgCdTe)
2013-02-01
ARL-TN-0527 February 2013 Approved for public release; distribution unlimited...Approved for public release; distribution unlimited. ii REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden...MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited. 13. SUPPLEMENTARY
Reflections on the Establishment of Constitutional Government in Eastern Europe.
ERIC Educational Resources Information Center
Varat, Jonathan D.
Establishing constitutional government involves not simply the creation of a written document that purports to create the political structure of a nation and guarantee rights to its people, but "constitutionalism" in the sense of meaningful and effective adherence to constitutional norms of democratic organization and the protection of…
James Madison's "Public" As Interpreter of the Constitution.
ERIC Educational Resources Information Center
Dewey, Donald O.
James Madison's thoughts on various interpretations of the Constitution maintain that public opinion is the ultimate method of legitimizing the document. The Constitution must prevail against mere public opinion, but public opinion may be used to establish the meaning of the Constitution when conflicting interpretations exist. The public good and…
Becoming Informed Citizens: Lessons on the Constitution for Junior High School Students.
ERIC Educational Resources Information Center
Wagner, Kenneth A.; And Others
This document consists of lesson plans for teaching junior high school students about the U.S. Constitution. Lessons are derived from teaching methods that instructors have found useful and appropriate for the actual condition of the ordinary classroom, and account for the characteristics and needs of the early adolescent. The document includes a…
ERIC Educational Resources Information Center
Oliveira, Cecilia Helena Lorenzini de Salles
1998-01-01
Brings a different reading of 1824's Brazilian Imperial Political Constitution. Discusses some historical and political circumstances of the document's construction. Investigates practices, conceptions, and supports that could have clarified some principles stressed by the document, especially those related to citizenship matters. (PA)
ERIC Educational Resources Information Center
Patrick, John J., Ed.; Long, Gerald P., Ed.
Debates over the separation or accommodation of religion and government have divided the United States since its founding. This collection of over 70 primary documents represents the ideas and issues on the interpretation of the United States Constitution's First Amendment clauses pertaining to establishment and free exercise of religion. The…
Care Planning for Prostate Cancer Patients on Active Surveillance
2017-10-01
U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release...Department of the Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704...Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION / AVAILABILITY
Identification of Immunogenic Targets for Lung Cancer Vaccines
2017-09-01
quantitative proteomic analysis to identify proteins overexpressed in non-small cell lung cancer cell lines compared with normal lung epithelial...Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution...Department of the Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188
DoD Alcohol and Substance Abuse Consortium Award
2017-10-01
ORGANIZATION: RESEARCH TRIANGLE INSTITUTE RESTRIANGLE PARK, NC 27709 REPORT DATE: October 2017 TYPE OF REPORT: Annual PREPARED FOR: U.S. Army Medical... Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited The...position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public
33 CFR 20.604 - Requests for production of documents or things, for inspection or other purposes.
Code of Federal Regulations, 2012 CFR
2012-07-01
... things for inspection or other purposes shall so move to the ALJ. The motion must state with... shall review the motion and enter an order approving or denying it in whole or in part. (c) A party... permit inspection and copying of documents. (d) A party may, after approval of an appropriate motion by...
33 CFR 20.604 - Requests for production of documents or things, for inspection or other purposes.
Code of Federal Regulations, 2014 CFR
2014-07-01
... things for inspection or other purposes shall so move to the ALJ. The motion must state with... shall review the motion and enter an order approving or denying it in whole or in part. (c) A party... permit inspection and copying of documents. (d) A party may, after approval of an appropriate motion by...
33 CFR 20.604 - Requests for production of documents or things, for inspection or other purposes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... things for inspection or other purposes shall so move to the ALJ. The motion must state with... shall review the motion and enter an order approving or denying it in whole or in part. (c) A party... permit inspection and copying of documents. (d) A party may, after approval of an appropriate motion by...
33 CFR 20.604 - Requests for production of documents or things, for inspection or other purposes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... things for inspection or other purposes shall so move to the ALJ. The motion must state with... shall review the motion and enter an order approving or denying it in whole or in part. (c) A party... permit inspection and copying of documents. (d) A party may, after approval of an appropriate motion by...
33 CFR 20.604 - Requests for production of documents or things, for inspection or other purposes.
Code of Federal Regulations, 2013 CFR
2013-07-01
... things for inspection or other purposes shall so move to the ALJ. The motion must state with... shall review the motion and enter an order approving or denying it in whole or in part. (c) A party... permit inspection and copying of documents. (d) A party may, after approval of an appropriate motion by...
Underkill. Scalable Capabilities for Military Operations Amid Populations
2009-01-01
Purchase this document Browse Books & Publications Make a charitable contribution Support RAND Report Documentation Page Form ApprovedOMB No. 0704-0188...Secretary of Defense Approved for public release; distribution unlimited DAVID C. GOMPERT | STUART E . JOHNSON MARTIN C. LIBICKI | DAVID R. FRELINGER... E . Hunter, War by Other Means—Building Complete and Balanced Capabilities for Counterinsurgency: iv Underkill Prompted by this finding, and with
The Oviduct and Serous Cancer Risk Assessment
2015-10-01
from Singapore National Medical Research Council. Author contribution statement Contributions of the co-authors to design (1), data col- lection (2...U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution...Department of the Army position, policy or decision unless so designated by other documentation. 2 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-19
... analysis capabilities of the current software; Investigate the feasibility of a new state-of-the-art NOMS... types or classes of aeronautical uses, violate the terms of airport grant agreements, or intrude into... uses under Federal, state, or local law. Approval does not by itself constitute an FAA implementing...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Flexible Polyurethane Foam... Constitution Avenue NW., Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4... Flexible Polyurethane Foam Fabrication (Renewal). ICR Numbers: EPA ICR Number 2027.05, OMB Control Number...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-05
... Seeking Exemption Under Section 312 of the Small Business Investment Act, Conflicts of Interest Notice is... of the Act and Section 107.730, Financings which Constitute Conflicts of Interest of the Small... considered a financing constituting a conflict of interest requiring prior SBA approval. Notice is hereby...
ERIC Educational Resources Information Center
Buele, Irene; Pablo, Vidueira
2016-01-01
The Constitution of Ecuador was approved in 2008, and promotes the application of participatory processes for resource distribution at different levels of government. The ultimate aim of the Constitution of Ecuador is to promote sustainable development and equitable distribution of resources and wealth, and to access the "Buen Vivir."…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-29
... Exemption Under Section 312 of the Small Business Investment Act, Conflicts of Interest Notice is hereby... 107.730, Financings which Constitute Conflicts of Interest of the Small Business Administration (``SBA... financing constituting a conflict of interest requiring prior SBA approval. Notice is hereby given that any...
14 CFR 77.75 - Establishment of antenna farm areas.
Code of Federal Regulations, 2011 CFR
2011-01-01
... indicated on an FAA planning document or military service military airport planning document. Planned or...; any other FAA planning document, or military service military airport planning document. Public use... layout plan, a military service approved military airport layout plan, or by any planning document...
The Evolution of Approval Services.
ERIC Educational Resources Information Center
Warzala, Martin
1994-01-01
Describes major developments in book approval plans used by academic libraries for acquisition and for information dissemination and document distribution services based on approval-like concepts. Topics addressed include publishers; marketing; the impact of library automation; value-added services; the economic climate; the influence of…
Electronic Approval: Another Step toward a Paperless Office.
ERIC Educational Resources Information Center
Blythe, Kenneth C.; Morrison, Dennis L.
1992-01-01
Pennsylvania State University's award-winning electronic approval system allows administrative documents to be electronically generated, approved, and updated in the university's central database. Campus business can thus be conducted faster, less expensively, more accurately, and with greater security than with traditional paper approval…
Habibi, Roojin; Lexchin, Joel; Mintzes, Barbara; Holbrook, Anne
2017-11-01
This study compares physicians' recall of the claims of benefits on cardiovascular disease and diabetes made by pharmaceutical sales representatives for drugs approved on the basis of a surrogate outcome, i.e., an off-label claim, compared with those approved on the basis of a serious morbidity or mortality (clinical) outcome. Physicians in primary care practices in Montreal, Vancouver, Sacramento and Toulouse, who saw sales representatives as part of their usual practice and served a non-referral population, were contacted in blocks of 25 from a randomized list of all physicians practising in the relevant metropolitan area. We compared how frequently physicians reported that sales reps made claims of serious morbidity or mortality (clinically meaningful) benefits for drugs approved on the basis of surrogate outcomes vs. drugs approved on the basis of clinical outcomes. There were 448 promotions for 58 unique brand name cardiovascular and diabetes drugs. Claims of clinically meaningful benefit were reported in 156 (45%) of the 347 promotions for surrogate outcome drugs, constituting unwarranted efficacy claims, i.e., off-label promotion. Claims of clinical benefit were reported in 72 of the 101 promotions (71%) for drugs approved on the basis of clinical outcomes, adjusted OR = 0.3 (95% CI 0.2, 0.6), P < 0.001. Claims of efficacy made in sales visit promotions for drugs approved only on the basis of surrogate outcomes extended beyond the regulator-approved efficacy information for the product in almost half of promotions. Unapproved claims of drug efficacy constitute a form of off-label promotion and merit greater attention from regulators. © 2017 The British Pharmacological Society.
Myeloid-Derived Suppressor Cells in Checkpoint Protein Inhibition for Melanoma
2017-09-01
Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release...official Department of the Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved...6402 9. SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Research and Materiel Command Fort
Defense Forensic Enterprise: Assessment and Status Report Personnel Accounting Extract
2013-12-01
represent the opinion of the Department of the Navy. APPROVED FOR PUBLIC RELEASE. DISTRIBUTION UNLIMITED. Copies of this document can be obtained through...Roberts Director, Aviation Systems and Technology Advanced Technology and Systems Analysis REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188... Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Does the Secretary approve project planning and design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Does the Secretary approve project planning and design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Does the Secretary have any other opportunities to approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Does the Secretary have any other opportunities to approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... completion of a PDP is not filed by the latter of the two dates, and no IDE is in effect, the device is... availability of a preamendments class III devices strategy document. The strategy document set forth FDA's... approved PMA or a declared completed PDP is required to be in effect for any such devices on or before 180...
Code of Federal Regulations, 2011 CFR
2011-01-01
... States-India Nuclear Cooperation Approval and Nonproliferation Enhancement Act Regarding the Safeguards Agreement Between India and the International Atomic Energy Agency Presidential Documents Other Presidential... of the United States-India Nuclear Cooperation Approval and Nonproliferation Enhancement Act...
Synthesis and Characterization of Partial Biobased Furan Polyamides
2014-02-01
Approved for public release; distribution is unlimited. NOTICES Disclaimers The...Weapons and Materials Research Directorate, ARL Approved for public release; distribution is unlimited...ii REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average
The pharmaceutical care and the rejected constitutional reform: what might have been and what is.
Siracusa, Margherita; Grappasonni, Iolanda; Petrelli, Fabio
2017-10-23
This study analyzes the current state of legislation pertaining to pharmaceutical/health care in a period of normative ferment characterized by continuous changes, after countless discussions that have been held on a proposed constitutional reform (rejected by the will of the people at the end of 2016). After a general reflection on the division of legislative powers between the State and its Regions, in the light of attempts to bring about a reform, we will analyse specific problems: from the recent, but in some ways already defined as historic, approval of the new Essential Levels of Care (LEC), the approval of the 2017 Budget Law (concerning important items such as the purchase of drugs), until we reach the Draft Law on competition which is in the process of being approved. All this is taking place in the context of loyal, unavoidable cooperation between State, Regions and local institutions, in the spirit of the ascendancy of the right to health over economic/financial interests in the country.
Three-Dimensional Effects of Crack Closure in Laminated Composite Plates Subjected to Bending Loads
1994-06-01
Approved by: •UW. Kwon, Thesis Advisor wathe D.K~elleher, Chairman Department of Mechanical Engineering ii ABSTRACT Fracture is one of the dominant...5 A. OVERVIEW .......................................... 5 B. CONSTITUTIVE EQUATION .............................. 9 1. Isotropic...the elemental nodes. B. CONSTITUTIVE EQUATION The material property matrix [D] is a symmetric matrix which includes elasticity moduli and Poisson’s
Advanced Vehicle Power Technology Alliance Technical Workshop and Operations Report
2011-10-05
Vehicle Exhaust TEG 2016 1 TEG: Thermo-Electric Generator UNCLASSIFIED: Distribution Statement A. Approved for public release. E16...Equipment 2016 Validation Data: − Power Electronics ― 2020 ― ― UNCLASSIFIED: Distribution Statement A. Approved for public release...Materiel Command (AMC) UNCLASSIFIED: Distribution Statement A. Approved for Public Release Report Documentation Page Form ApprovedOMB No. 0704-0188
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...
Your Official U.S. Constitution Sign-On Information and Documents.
ERIC Educational Resources Information Center
National Conference of Christians and Jews, New York, NY.
These learning materials are centered around the idea that each individual should "sign" the U.S. Constitution. A facsimile of the U.S. Constitution is included in each learning packet for students to sign. Section 1 contains five teaching modules on the constitutional process that can be used with any subject. The first two modules,…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-26
... obtain the documents at either http://www.fda.gov/Drugs/DevelopmentApprovalProcess/FormsSubmission...BloodVaccines/GuidanceComplianceRegulatoryInformation/Guidances/default.htm . Dated: August 20, 2013...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... obtain the documents at either http://www.fda.gov/Drugs/DevelopmentApprovalProcess/FormsSubmission...BloodVaccines/GuidanceComplianceRegulatoryInformation/Guidances/default.htm . Dated: February 8, 2013...
ERIC Educational Resources Information Center
Cramer, Elizabeth, Ed.; Hill, Margaret, Ed.
Twenty-eight lesson plans developed by California teachers who attended a summer institute on Congress and the Constitution are presented in this document. Sample lesson plan titles are: (1) "Geopolitics and the Constitution," (2) "Judicial Review," (3) "Electoral College and the Constitution," (4) "First…
Improving Diagnosis of Sepsis After Burn Injury Using a Portable Sepsis Alert System
2015-10-01
77555 REPORT DATE: October 2015 TYPE OF REPORT : Annual PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702...5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited The views, opinions and/or findings contained in this report are...documentation. Page 1 of 19 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is
Enhancing Quality of Life for Breast Cancer Patients with Bone Metastases
2008-04-01
Army position, policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188...Approved for Public Release; Distribution Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT See Next Page . 15. SUBJECT TERMS Breast...CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT 18. NUMBER OF PAGES 19a. NAME OF RESPONSIBLE PERSON USAMRMC a. REPORT U b. ABSTRACT U c. THIS PAGE U
Inert Ingredients Overview and Guidance
This Web page provides information on inert ingredients approved for use in pesticide products and the guidance documents that are available to assist in obtaining approval for a new inert ingredient.
1 CFR 19.2 - Routing and approval of drafts.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 1 General Provisions 1 2014-01-01 2012-01-01 true Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...
1 CFR 19.2 - Routing and approval of drafts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1 General Provisions 1 2010-01-01 2010-01-01 false Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...
1 CFR 19.2 - Routing and approval of drafts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 1 General Provisions 1 2011-01-01 2011-01-01 false Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...
1 CFR 19.2 - Routing and approval of drafts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 1 General Provisions 1 2012-01-01 2012-01-01 false Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...
1 CFR 19.2 - Routing and approval of drafts.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 1 General Provisions 1 2013-01-01 2012-01-01 true Routing and approval of drafts. 19.2 Section 19.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER PREPARATION, TRANSMITTAL, AND PROCESSING OF DOCUMENTS EXECUTIVE ORDERS AND PRESIDENTIAL PROCLAMATIONS § 19.2 Routing and approval of drafts...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2012 CFR
2012-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2010 CFR
2010-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
25 CFR 542.15 - What are the minimum internal control standards for credit?
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Documentation of authorization by a person designated by management to approve credit limits; and (v) Credit... approved by personnel designated by management. (4) Proper approval of credit extensions over ten percent... that require access and are so authorized by management; (ii) Outstanding credit instruments shall be...
22 CFR 120.20 - License or other approval.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false License or other approval. 120.20 Section 120.20 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.20 License or other approval. License means a document bearing the word “license” issued by...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
...-0413; Amdt. No. 29-55] RIN 2120-AJ51 Fatigue Tolerance Evaluation of Metallic Structures; OMB Approval of Information Collection AGENCY: Federal Aviation Administration, DOT. ACTION: Final rule; OMB approval of information collection. SUMMARY: This document notifies the public of the Office of Management...
First Among Equals: Interagency Cooperation in Stability Operations
2016-05-26
Approved for public release; distribution is unlimited REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for...11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for Public Release; Distribution is Unlimited 13... publication or sale of copyrighted images is not permissible ii
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
... documents at either http://www.fda.gov/Drugs/DevelopmentApprovalProcess/FormsSubmissionRequirements...Vaccines/GuidanceComplianceRegulatoryInformation/Guidances/default.htm . Dated: April 10, 2013. Leslie Kux...
Anfang, Stuart A; Faulkner, Larry R; Fromson, John A; Gendel, Michael H
2005-01-01
The psychiatric evaluation of a physician's fitness for duty is an undertaking that is both important to patients' well-being and to the physician-subject of the evaluation. It is necessary that psychiatrists who agree to perform such evaluations proceed in a careful and thorough manner. This document was developed to provide general guidance to the psychiatric evaluators in these situations. It was prepared by the American Psychiatric Association (APA) Council on Psychiatry and Law and Corresponding Committee on Physician Health, Illness, and Impairment, of which the authors are members. The Resource Document was approved by the APA Joint Reference Committee in June 2004. APA Resource Documents do not represent official policy of the American Psychiatric Association. This Resource Document was edited to conform to Journal style and has therefore been modified slightly from the original document approved by the APA.
Constitutional Issues--Watergate and the Constitution. Teaching with Documents.
ERIC Educational Resources Information Center
National Archives and Records Administration, Washington, DC.
When U.S. President Richard Nixon resigned in 1974 in the wake of the Watergate scandal, it was only the second time that impeachment of a president had been considered. Although the U.S. Constitution has provisions for a person removed from office to be indicted, there are no guidelines in the Constitution about a President who has resigned. The…
77 FR 13997 - Revising Standards Referenced in the Acetylene Standard
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
....S. Department of Labor, 200 Constitution Avenue NW., Washington, DC 20210; telephone: (202) 693-1999.... Department of Labor, 200 Constitution Avenue NW., Washington, DC 20210; telephone: (202) 693-2260; fax: (202..., 200 Constitution Avenue NW., Washington, DC 20210, authorized the preparation of this document. OSHA...
1983-06-01
and they do not constitute a standard, specification, or regulation. This report, or portions thereof may not be used for advertising or sales ... promotion purposes. Citation of trade names and manufacturers does not constitute endorsement or approval of such products. Y5. Ji I I .- "r
7 CFR 764.458 - Vendor approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... (3) Any changes in curriculum, instructor, or cost require prior approval by the Agency. (4) The... agreement; (ii) Any changes in curricula, instructor, or cost; and (iii) Documentation that the vendor is...
7 CFR 764.458 - Vendor approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (3) Any changes in curriculum, instructor, or cost require prior approval by the Agency. (4) The... agreement; (ii) Any changes in curricula, instructor, or cost; and (iii) Documentation that the vendor is...
Follow-up Evaluation of Air Force Blood Donors Screening Positive for Chagas Disease
2017-08-27
abstract, paper. poster and other supporting documentation. 5. Save and forward. via email. the processing form and all supporting documentation to...letter of approval or disapproval. 9. Once your manuscript, poster or presentation has been approved for a one-time public release. you may proceed with...legal reviews. please contact the legal office at (210) 671-5795/3365. DSN 473. NOTE: All abstracts, papers, posters . etc .. should contain the
2012-06-29
resistances, respectively, and gd is the output conductance. The reduced parasitic capacitances and resistances provided by the self-aligned T-gate design ...Department of the Army position, policy or decision, unless so designated by other documentation. 12. DISTRIBUTION AVAILIBILITY STATEMENT Approved for...position, policy or decision, unless so designated by other documentation. Approved for public release; distribution is unlimited. ... 59654.5-MS-DRP Self
10 CFR 95.37 - Classification and preparation of documents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... classification decisions. (c) Markings required on face of documents. (1) For derivative classification of... to a document must be placed in a conspicuous fashion in letters at the top and bottom of the outside... on the face of the document: Reproduction or Further Dissemination Requires Approval of If any...
10 CFR 95.37 - Classification and preparation of documents.
Code of Federal Regulations, 2011 CFR
2011-01-01
... classification decisions. (c) Markings required on face of documents. (1) For derivative classification of... to a document must be placed in a conspicuous fashion in letters at the top and bottom of the outside... on the face of the document: Reproduction or Further Dissemination Requires Approval of If any...
List of public hearing & comment period document(s) for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).
10 CFR 830.204 - Documented safety analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Documented safety analysis. 830.204 Section 830.204 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.204 Documented safety analysis... approval from DOE for the methodology used to prepare the documented safety analysis for the facility...
This Constitution: A Bicentennial Chronicle, Nos. 14-18.
ERIC Educational Resources Information Center
Mann, Shelia, Ed.
1987-01-01
Each issue in this bicentennial series features articles on selected U.S. Constitution topics, along with a section on primary documents and lesson plans or class activities. Issue 14 features: (1) "The Political Economy of the Constitution" (K. Dolbeare; L. Medcalf); (2) "A 'New Historical Whooper': Creating the Art of the…
77 FR 57981 - Constitution Day and Citizenship Day, Constitution Week, 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-18
... than two centuries, our country has drawn enterprising men and women from around the world--individuals... on the basic rights and responsibilities of citizenship, the founding documents from which they were... Constitution, and reaffirm our commitment to the rights and obligations of citizenship in this great Nation...
The Constitution and Citizenship Education.
ERIC Educational Resources Information Center
Shoemaker, Rebecca S.
The paper takes the position that the study and understanding of the United States Constitution should be a critical part of citizenship education, especially as its Bicentennial approaches. Several factors suggest that the Constitution has become the most durable document of its kind in history, and that its teaching should be centered in both…
From "Conflict" to "Constitutional Question": Transformations in Early American Public Discourse.
ERIC Educational Resources Information Center
Zarefsky, David; Gallagher, Victoria J.
1990-01-01
Suggests that the United States Constitution contains nearly universal concepts but also ambiguities which trigger conflicts. Describes the evolution of the document through its framing and through controversy surrounding the Alien and Sedition Acts, state nullification of federal action, and secession. Concludes that the Constitution provides a…
29 CFR 452.19 - Executive functions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... identified as an officer under the constitution and bylaws of the organization. Authorization to perform such functions need not be contained in any provision of the constitution or bylaws or other document but may be... governing body) or if the constitution or bylaws of the union designate such positions as officers. ...
29 CFR 452.19 - Executive functions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... identified as an officer under the constitution and bylaws of the organization. Authorization to perform such functions need not be contained in any provision of the constitution or bylaws or other document but may be... governing body) or if the constitution or bylaws of the union designate such positions as officers. ...
29 CFR 452.19 - Executive functions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... identified as an officer under the constitution and bylaws of the organization. Authorization to perform such functions need not be contained in any provision of the constitution or bylaws or other document but may be... governing body) or if the constitution or bylaws of the union designate such positions as officers. ...
34 CFR 300.311 - Specific documentation for the eligibility determination.
Code of Federal Regulations, 2012 CFR
2012-07-01
... does not achieve adequately for the child's age or to meet State-approved grade-level standards...-approved grade-level standards consistent with § 300.309(a)(2)(i); or (B) The child exhibits a pattern of strengths and weaknesses in performance, achievement, or both, relative to age, State-approved grade level...
34 CFR 300.311 - Specific documentation for the eligibility determination.
Code of Federal Regulations, 2014 CFR
2014-07-01
... adequately for the child's age or to meet State-approved grade-level standards consistent with § 300.309(a)(1); and (ii)(A) The child does not make sufficient progress to meet age or State-approved grade-level... weaknesses in performance, achievement, or both, relative to age, State-approved grade level standards or...
34 CFR 300.311 - Specific documentation for the eligibility determination.
Code of Federal Regulations, 2013 CFR
2013-07-01
... does not achieve adequately for the child's age or to meet State-approved grade-level standards...-approved grade-level standards consistent with § 300.309(a)(2)(i); or (B) The child exhibits a pattern of strengths and weaknesses in performance, achievement, or both, relative to age, State-approved grade level...
43 CFR 3183.6 - Plan of development.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan of development. 3183.6 Section 3183.6... Filing and Approval of Documents § 3183.6 Plan of development. Three counterparts of all plans of development and operation shall be submitted for approval under an approved agreement. [48 FR 26766, June 10...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-21
.... December 13 Chairman's Introductory Remarks Working Group Reports Review of Meeting Agenda Review/Approval... Services (SBS) Program--Status. EUROCAE WG-51 Report Review/Approval--New Document--Safety, Performance and.../SC186-326. Review/Approval--Revised DO-317A--Minimum Operational Performance Standards (MOPS) for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Activities; Submission to OMB for Review and Approval; Comment Request; Residential Lead-Based Paint Hazard... review and approval: Residential Lead-Based Paint Hazard Disclosure Requirements; EPA ICR No. [email protected] or by mail to: Document Control Office (DCO), Office of Pollution Prevention and Toxics...
Evolution & Status of Approval Plans. SPEC Kit 221.
ERIC Educational Resources Information Center
Flood, Susan, Comp.
This report documents the results of a survey on the current use and management of approval plans, and compares them with similar studies published in SPEC kits in 1982 and 1988. Overall, Association of Research Libraries (ARL) institutions still consider approval plans to be efficient and cost effective. Survey results include: (1) the percentage…
Development of Hydrophobic Coatings for Water-Repellent Surfaces Using Hybrid Methodology
2014-04-01
Bujanda, and Daphne Pappas ARL-TR-6898 April 2014 Approved for public release...Approved for public release; distribution is unlimited. ii REPORT DOCUMENTATION PAGE Form Approved OMB No...0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing
Perchlorate Remediation Using New Nanoscale Polymer Technology
2009-11-01
Michigan University/Dendritic Nanotechnologies, Inc./CMU-RC Distribution Statement A: Approved for Public Release, Distribution is...Unlimited Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT Principal Ideas
40 CFR 52.1634 - Significant deterioration of air quality.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Significant Deterioration (PSD) and its Supplemental document, is approved as meeting the requirements of part... satisfying the conditions of EPA's conditional approval of the State's PSD program on February 27, 1987 (52...
40 CFR 52.1634 - Significant deterioration of air quality.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Significant Deterioration (PSD) and its Supplemental document, is approved as meeting the requirements of part... satisfying the conditions of EPA's conditional approval of the State's PSD program on February 27, 1987 (52...
40 CFR 52.1634 - Significant deterioration of air quality.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Significant Deterioration (PSD) and its Supplemental document, is approved as meeting the requirements of part... satisfying the conditions of EPA's conditional approval of the State's PSD program on February 27, 1987 (52...
ERIC Educational Resources Information Center
Farkas, Steve; Johnson, Jean; Duffett, Ann
A study conducted by Public Agenda Foundation, in partnership with the National Constitution Center, examined what typical adults know and believe about the U.S. Constitution, probed what they understand their rights and civic responsibilities to be, and reported their views on the document's importance and relevance in their lives today. The…
An Investigation Into Ventilation And Dust Issues For The Joint Light Tactical Vehicle (JLTV)
2012-05-01
testing at Yuma and other places, the JLTV is filling up with dust and people are having a difficult time seeing and breathing. Obviously, a bad ...2012 Approved for public release; distribution is unlimited. NOTICES Disclaimers The...Citation of manufacturer’s or trade names does not constitute an official endorsement or approval of the use thereof. Destroy this report when it is
Department of Defense Dictionary of Military and Associated Terms
2001-04-12
Standardization Agreement (STANAG) 3680, definitions, constitute approved DOD which ratifies the NATO Glossary of Terms terminology for general use by all...Webster. 6. Publication Format b. Terminology should be of general military or associated significance. Technical This edition of JP 1-02 has been... general a. Main Body. This part of the dictionary military or associated significance. contains all terms and definitions approved for use within the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Washington TRU Solutions, LLC
The purpose of this program guidance document is to provide technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the SARP and/or C of C shall govern. The C of C states: ''...each package must be prepared for shipment and operated in accordance with themore » procedures described in Chapter 7.0, ''Operating Procedures,'' of the application.'' It further states: ''...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, ''Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with 10 CFR {section} 71.11, ''Deliberate Misconduct.'' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions. Following these instructions assures that operations are safe and meet the requirements of the SARP. This document is available on the Internet at: ttp://www.ws/library/t2omi/t2omi.htm. Users are responsible for ensuring they are using the current revision and change notices. Sites may prepare their own document using the word-for-word steps in th is document, in sequence, including Notes and cautions. Site specific information may be included as necessary. The document, and revisions, must then be submitted to CBFO at sitedocuments@wipp.ws for approval. A copy of the approval letter from CBFO shall be available for audit purposes. Users may develop site-specific procedures addressing preoperational activities, quality assurance (QA), hoisting and rigging, and radiation health physics to be used with the instructions contained in this document. Users may recommend changes to this document by submitting their recommendations (in writing) to the WIPP M&O Contractor RH Packaging Maintenance Engineer for evaluation. If approved, the change(s) will be incorporated into this document for use by ALL users. Before first use and every 12 months after, user sites will be audited to this document to ensure compliance. They will also be audited within one year from the effective date of revisions to this document.« less
2017-10-01
20007 REPORT DATE: October 2017 TYPE OF REPORT : Annual PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland...21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited The views, opinions and/or findings contained in this report ...other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is
25 CFR 81.18 - Manner of voting.
Code of Federal Regulations, 2013 CFR
2013-04-01
... the adoption of a constitution, the ratification of a charter, or the amendment of such documents... further, that no charter shall be considered ratified if the proposed constitution is not adopted and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-26
... Documents Access and Management System (ADAMS) under Accession Number ML090510686. The proposed changes... Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC... expedited approval of plant-specific adoption of TSTF- 501, Revision 1. Documents: You can access publicly...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-11
... an errata sheet are available in the Agencywide Documents Access and Management System (ADAMS) under... Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received... facilitate expedited approval of plant-specific adoption of TSTF-493, Revision 4. Documents: You can access...
17 CFR 200.507 - Declassification dates on derivative documents.
Code of Federal Regulations, 2011 CFR
2011-04-01
... derivative documents. 200.507 Section 200.507 Commodity and Securities Exchanges SECURITIES AND EXCHANGE... of National Security Information and Material § 200.507 Declassification dates on derivative... derivative document that derives its classification from the approved use of the classification guide of...
Equality: Constitutional Update. Bar/School Partnership Programs Series.
ERIC Educational Resources Information Center
American Bar Association, Chicago, IL. Special Committee on Youth Education for Citizenship.
The second in a special four-part series of law-school partnership handbooks on constitutional themes, this document focuses on equality. "Equality--the Forgotten Word" (J. A. Hughes) discusses what has been considered the U.S. Constitution's one flaw, its failure to abolish slavery, and the remedy to that flaw, the Fourteenth Amendment.…
Code of Federal Regulations, 2014 CFR
2014-10-01
... measuring, surveying, photographing, testing, or sampling the property or any designated object or operation... approval of the Board. The party seeking such approval must file an appropriate motion containing an... ensure the agreement is kept confidential. The motion seeking approval may be filed at any time after the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... measuring, surveying, photographing, testing, or sampling the property or any designated object or operation... approval of the Board. The party seeking such approval must file an appropriate motion containing an... ensure the agreement is kept confidential. The motion seeking approval may be filed at any time after the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... measuring, surveying, photographing, testing, or sampling the property or any designated object or operation... approval of the Board. The party seeking such approval must file an appropriate motion containing an... ensure the agreement is kept confidential. The motion seeking approval may be filed at any time after the...
Code of Federal Regulations, 2012 CFR
2012-10-01
... measuring, surveying, photographing, testing, or sampling the property or any designated object or operation... approval of the Board. The party seeking such approval must file an appropriate motion containing an... ensure the agreement is kept confidential. The motion seeking approval may be filed at any time after the...
Metamaterial Resonant Absorbers for Terahertz Sensing
2015-12-01
Equation Chapter 1 Section 1 NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release; distribution...Co-Advisor Fabio Alves THIS PAGE INTENTIONALLY LEFT BLANK i REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704–0188 Public reporting...Department of Defense or the U.S. government. IRB Protocol number ____N/A____. 12a. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public
High Power Quantum Cascade Laser for Terahertz Imaging
2012-03-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release, distribution is unlimited HIGH POWER QUANTUM...Second Reader: Fabio Alves THIS PAGE INTENTIONALLY LEFT BLANK i REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting...Department of Defense or the U.S. Government. IRB Protocol Number: N/A 12a. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public release
Gago-Veiga, A B; Santos-Lasaosa, S; Cuadrado, M L; Guerrero, Á L; Irimia, P; Láinez, J M; Leira, R; Pascual, J; Sanchez Del Río, M; Viguera, J; Pozo-Rosich, P
2017-11-20
OnabotulinumtoxinA has been demonstrated to be effective as a preventive treatment in patients with chronic migraine (CM). Five years after the approval of onabotulinumtoxinA in Spain, the Headache Study Group of the Spanish Society of Neurology considered it worthwhile to gather a group of experts in treating patients with CM in order to draw up, based on current evidence and our own experience, a series of guidelines aimed at facilitating the use of the drug in daily clinical practice. For this purpose, we posed 12 questions that we ask ourselves as doctors, and which we are also asked by our patients. Each author responded to one question, and the document was then reviewed by everyone. We hope that this review will constitute a practical tool to help neurologists treating patients with CM. Copyright © 2017 Sociedad Española de Neurología. Publicado por Elsevier España, S.L.U. All rights reserved.
Why it's time to recognise Indigenous peoples in the Constitution.
Williams, George
2015-06-01
This article provides an overview of why it is proposed that the Australian Constitution be changed to recognise Aboriginal and Torres Strait Islander peoples. It then establishes what changes are needed to the Constitution. The Australian Constitution fails to recognise Indigenous peoples, and still enables discrimination against them. This provides a sound case for changing the document. © The Royal Australian and New Zealand College of Psychiatrists 2015.
List of Laboratories Approved by EPA for the Fourth Unregulated Contaminant Monitoring Rule (UCMR 4)
This document provides a list of laboratories that met the Unregulated Contaminant Monitoring Rule 4 (UCMR 4) Laboratory Approval Program application and Proficiency Testing (PT) criteria for the methods indicated.
19 CFR 210.4 - Written submissions; representations; sanctions.
Code of Federal Regulations, 2013 CFR
2013-04-01
... document shall be filed in electronic form on one CD-ROM, DVD, or other portable electronic media approved... shall be filed in electronic form on one CD-ROM, DVD, or other portable electronic media approved by the...
19 CFR 210.4 - Written submissions; representations; sanctions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... document shall be filed in electronic form on one CD-ROM, DVD, or other portable electronic media approved... shall be filed in electronic form on one CD-ROM, DVD, or other portable electronic media approved by the...
List of Laboratories Approved by EPA for the Third Unregulated Contaminant Monitoring Rule (UCMR 3)
This document provides a list of laboratories that met the Unregulated Contaminant Monitoring Rule 3 (UCMR 3) Laboratory Approval Program application and Proficiency Testing (PT) criteria for the methods indicated.
7 CFR 1717.308 - RUS approval of nonconforming rates.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717.308 RUS approval of... of the RUS wholesale power contract and other RUS documents if RUS determines, in its sole discretion...
7 CFR 1717.308 - RUS approval of nonconforming rates.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717.308 RUS approval of... of the RUS wholesale power contract and other RUS documents if RUS determines, in its sole discretion...
USDOT guidance summary for connected vehicle deployments : human use approval.
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to human use approval required for the CV Pilots DeploymentConcept Development Phase. Background is provided on relevant Federal guidance and Institutional Review Boards,including specific reference...
An Examination of the Current Revolution in Soviet Military Affairs.
1988-03-01
A-A194 463 AN EXAMINATION OF THE CJRUENT REVOLUTION IN SOVIET i/I MILITARY AFFAIRS(U) NAVAL POSTGRADUATE SCHOOL MONTEREY~CA R L CSUTI MAR 88...Lee Csuti March 1988 Thesis Advisor: M. Tsypkin Approved for public release; distribution is unlimited. REPORT DOCUMENT..ATION PAGE 7a ’. r : Scur C:as...ede Approved tor public release: distributi~n is unlihited. P- v r - r -n. Organization R .ort \\um-erns) 5 \\lonioring Or anizati|n Report Numbers) 7a Name
2010-09-08
described as an action “approving the United States’ international legal obligations specified by the Agreement,” and the amendment of statutes to... unconstitutionally delegate either legislative or treaty-making authority to the President.3 In the Reciprocal Trade Agreements Act of 1934, as amended and extended...legislative vetoes of executive implementing actions might not comport with constitutional requirements regarding the passage of legislation. In the Trade
2017-12-30
from the Defense Technical Information Center (DTIC) (http://www.dtic.mil). AFRL-RV-PS-TR-2018-0008 HAS BEEN REVIEWED AND IS APPROVED FOR...report is published in the interest of scientific and technical information exchange, and its publication does not constitute the Government’s approval... information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and
Solar Cycle Effects on the Near-Earth Space Systems
1990-08-06
foreign nationals. This technical report has been reviewed and is approved for publication. Publication of this report does not constitute Air Force...approval of the report’s findings or conclusions. It is published only for the exchange and stimulation of ideas. RAFAEL A. RIVIERE, Capt, USAF ONATHAN...M. EMHES , MAJ, USAF MOIE Project Officer MOIE Project Manager SSD/CNL AFSTC/WCO OL-AB UNCLASSIFIED SECURITY CLASSIFICATION OF THIS PAGE REPORT
15 CFR 930.125 - Notice of appeal and application fee to the Secretary.
Code of Federal Regulations, 2014 CFR
2014-01-01
... OCEAN AND COASTAL RESOURCE MANAGEMENT FEDERAL CONSISTENCY WITH APPROVED COASTAL MANAGEMENT PROGRAMS... appeal to the Secretary, Herbert C. Hoover Building, 14th Street and Constitution Avenue, NW., Washington...
2012-04-01
TRADE NAME, TRADEMARK, MANUFACTURER , OR OTHERWISE, DOES NOT CONSTITUTE OR IMPLY ITS ENDORSEMENT, RECOMMENDATION, OR FAVORING BY THE U.S. GOVERNMENT...TRADE NAMES USE OF TRADE NAMES OR MANUFACTURERS IN THIS REPORT DOES NOT CONSTITUTE AN OFFICIAL ENDORSEMENT OR APPROVAL OF THE USE OF...on Gel-Pak Ready for Noodle Wire Attachment ..................... 10 13. Waveshaper (on Right) Beside a 0.5-Inch Steel Ball
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-17
... Original Documents; OMB Control No. 1615-0100. The Department of Homeland Security, U.S. Citizenship and...: Request for the Return of Original Documents. (3) Agency form number, if any, and the applicable component... person is eligible to obtain original document(s) contained in an alien file. (5) An estimate of the...
New York and the Union: Contributions to the American Constitutional Experience.
ERIC Educational Resources Information Center
Schechter, Stephen L., Ed.; Bernstein, Richard B., Ed.
This book provides a detailed account of the role of the state of New York in the history and development of the United States Constitution. The document consists of some 68 essays, in addition to a foreword, editors' introduction, and chronology of bicentennial dates. Part 1, "Origins of Constitutionalism in New York," addresses such…
We the People: Law-Related Lessons on Teaching the Constitution.
ERIC Educational Resources Information Center
Constitutional Rights Foundation, Chicago, IL.
The Unites States Constitution and the Bill of Rights set forth the basic principles of the U.S. democratic constitutional order. It is from these documents that the fundamental political concepts of the United States are derived. The program presented here was developed for junior high school students and is intended to combat the apathy toward…
76 FR 17032 - Forbearance Petition Filing Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
... Petition Filing Requirements AGENCY: Federal Communications Commission. ACTION: Final rule; confirmation of... Budget (OMB) had approved the associated information collection requirements. OMB approved those information collection requirements on April 5, 2010, under OMB Control Number 3060-1138. This document...
Low-Cost Ground Sensor Network for Intrusion Detection
2017-09-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release. Distribution is unlimited. LOW- COST GROUND...Gurminder Singh THIS PAGE INTENTIONALLY LEFT BLANK i REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this...
Approval Letter for an Alternative Renewable Biomass Tracking Program
This January 27, 2015 letter and decision document from EPA approves the Argentine Chamber of Biofuel's (CARBIO) Alternate Biomass Traking Program meeting all the requirements outlined in 40 CFR § 80.1454, including elements determined necessary to achieve
Waste-to-Energy Projects at Army Installations
2011-01-13
JAN 2011 US Army Corps of Engineers BUILDING STRONG® Distribution Statement A -- Approved for public release; distribution is unlimited. Report...Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response...NUMBER(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES presented at the DOE
In Situ Bioremediation of Perchlorate in Groundwater
2009-07-01
Inc. Jay Diebold Shaw Environmental, Inc. Approved for public release; distribution unlimited. Standard Form 298...Rev. 8/98) REPORT DOCUMENTATION PAGE Prescribed by ANSI Std. Z39.18 Form Approved OMB No. 0704-0188 The public reporting burden for this...Approved for Public Release, Distribution is Unlimited None A field demonstration was conducted to evaluate the in situ treatment of perchlorate using a
Design and Development of a Counter Swarm Prototype Air Vehicle
2017-12-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release. Distribution is unlimited. DESIGN AND DEVELOPMENT OF A...INTENTIONALLY LEFT BLANK i REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704–0188 Public reporting burden for this collection of information is...number ____N/A____. 12a. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public release. Distribution is unlimited. 12b. DISTRIBUTION CODE 13
2010-06-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release; distribution is unlimited HIGH TERAHERTZ...Gamani Karunasiri Dragoslav Grbovic THIS PAGE INTENTIONALLY LEFT BLANK i REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public ...Approved for public release; distribution is unlimited. 12b. DISTRIBUTION CODE 13. ABSTRACT (maximum 200 words) The terahertz (THz) region of the
Lysozyme Catalyzes the Formation of Antimicrobial Silver Nanoparticles (POSTPRINT)
2009-04-01
2009 Approved for public release; distribution unlimited. See additional restrictions described on inside pages STINFO COPY © 2009...AIR FORCE MATERIEL COMMAND UNITED STATES AIR FORCE i REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited. 13. SUPPLEMENTARY NOTES Journal article published in ACS
Diffusion and Mechanical Properties of Polyether-Polyurethanes Reinforced with Silica
2016-05-01
with Silica by James M Sloan and Henry Feuer Approved for public release; distribution is unlimited. NOTICES...Directorate, ARL Henry Feuer TKC Global Inc., Aberdeen Proving Ground, MD Approved for public release; distribution is...unlimited. FOR OFFICIAL USE ONLY (delete if not FOUO) ii REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this
Development of Electro-Optical Standard Processes for Application
2011-11-01
AERONAUTICS AND SPACE ADMINISTRATION DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE DISTRIBUTION IS UNLIMITED Report Documentation Page Form ApprovedOMB No...0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT Defines the process of
Highly Absorbing Metal Nanolaminates for Bi-Material THz Sensors
2011-09-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release; distribution is unlimited HIGHLY ABSORBING...Prescribed by ANSI Std. 239-18 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is...Government. IRB Protocol number: N/A. 12a. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public release; distribution is unlimited 12b
75 FR 18872 - Ginnie Mae Multiclass Securities Program Documents
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-13
... Securities Program Documents AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY... with the Multiclass Securities Program. The intent of the Multiclass Securities program is to increase... Securities Program Documents. OMB Approval Number: 2503-0030. Form Numbers: None. Description of the Need for...
USSR Report, USA: Economics, Politics, Ideology, No. 9. September 1984.
1984-12-10
refe- rences to the constitutional principle of the separation of powers and insisted on the effective exercise of powers by the Congress and the...authors of the constitution did not have our discomfort in mind when they composed this document. They wanted accounta- bility and the separation of powers . They...integral part of the constitutional separation of powers . The legislative veto, in accordance with the constitution, could be regarded as a legislative
The principles and operating procedures for the National Environmental Laboratory Accreditation Conference (NELAC) are contained in the NELAC Constitution and Bylaws. The major portion of this document (standards) contains detailed requirements for accrediting environmental labo...
Roadmap for the international, accelerator-based neutrino programme
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cao, J.; de Gouvêa, A.; Duchesneau, D.
In line with its terms of reference the ICFA Neutrino Panel has developed a roadmap for the international, accelerator-based neutrino programme. A "roadmap discussion document" was presented in May 2016 taking into account the peer-group-consultation described in the Panel's initial report. The "roadmap discussion document" was used to solicit feedback from the neutrino community---and more broadly, the particle- and astroparticle-physics communities---and the various stakeholders in the programme. The roadmap, the conclusions and recommendations presented in this document take into account the comments received following the publication of the roadmap discussion document. With its roadmap the Panel documents the approved objectivesmore » and milestones of the experiments that are presently in operation or under construction. Approval, construction and exploitation milestones are presented for experiments that are being considered for approval. The timetable proposed by the proponents is presented for experiments that are not yet being considered formally for approval. Based on this information, the evolution of the precision with which the critical parameters governinger the neutrino are known has been evaluated. Branch or decision points have been identified based on the anticipated evolution in precision. The branch or decision points have in turn been used to identify desirable timelines for the neutrino-nucleus cross section and hadro-production measurements that are required to maximise the integrated scientific output of the programme. The branch points have also been used to identify the timeline for the R&D required to take the programme beyond the horizon of the next generation of experiments. The theory and phenomenology programme, including nuclear theory, required to ensure that maximum benefit is derived from the experimental programme is also discussed.« less
14 CFR 1261.312 - Action on approved claims.
Code of Federal Regulations, 2010 CFR
2010-01-01
... constitute a complete release of any claim against the United States and against any employee of the Government whose act or omission gave rise to the claim, by reason of the same subject matter. ...
78 FR 40745 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
.... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR part 95, subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 Estimated...
Information Model for Reusability in Clinical Trial Documentation
ERIC Educational Resources Information Center
Bahl, Bhanu
2013-01-01
In clinical research, New Drug Application (NDA) to health agencies requires generation of a large number of documents throughout the clinical development life cycle, many of which are also submitted to public databases and external partners. Current processes to assemble the information, author, review and approve the clinical research documents,…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
... updating and revising a set of production, underwriting, asset management, closing, and other documents... clarify the requirements for a management agent and the management agreement. Production--Firm Commitments... closing documents to the Office of Management and Budget (OMB) for review and approval, and assignment of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-14
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5623-N-03] HUD Healthcare Facility... notice announces that the healthcare facility documents have completed the notice and comment processes... of Healthcare Programs, Office of Housing, Department of Housing and Urban Development, 451 7th...
7 CFR 1710.407 - Loan documents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Loan documents. 1710.407 Section 1710.407 Agriculture... GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO ELECTRIC LOANS AND GUARANTEES Application Requirements and Procedures for Loans § 1710.407 Loan documents. Following approval of a loan, RUS will forward...
36 CFR 219.14 - Decision document and planning records.
Code of Federal Regulations, 2012 CFR
2012-07-01
... planning records. 219.14 Section 219.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... records. (a) Decision document. The responsible official shall record approval of a new plan, plan... (§ 219.15); (4) The documentation of how the best available scientific information was used to inform...
36 CFR 219.14 - Decision document and planning records.
Code of Federal Regulations, 2014 CFR
2014-07-01
... planning records. 219.14 Section 219.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... records. (a) Decision document. The responsible official shall record approval of a new plan, plan... (§ 219.15); (4) The documentation of how the best available scientific information was used to inform...
32 CFR 813.5 - Shipping or transmitting visual information documentation images.
Code of Federal Regulations, 2010 CFR
2010-07-01
... documentation images. 813.5 Section 813.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE... visual information documentation images. (a) COMCAM images. Send COMCAM images to the DoD Joint Combat... the approval procedures that on-scene and theater commanders set. (b) Other non-COMCAM images. After...
32 CFR 813.5 - Shipping or transmitting visual information documentation images.
Code of Federal Regulations, 2013 CFR
2013-07-01
... documentation images. 813.5 Section 813.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE... visual information documentation images. (a) COMCAM images. Send COMCAM images to the DoD Joint Combat... the approval procedures that on-scene and theater commanders set. (b) Other non-COMCAM images. After...
32 CFR 813.5 - Shipping or transmitting visual information documentation images.
Code of Federal Regulations, 2011 CFR
2011-07-01
... documentation images. 813.5 Section 813.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE... visual information documentation images. (a) COMCAM images. Send COMCAM images to the DoD Joint Combat... the approval procedures that on-scene and theater commanders set. (b) Other non-COMCAM images. After...
32 CFR 813.5 - Shipping or transmitting visual information documentation images.
Code of Federal Regulations, 2012 CFR
2012-07-01
... documentation images. 813.5 Section 813.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE... visual information documentation images. (a) COMCAM images. Send COMCAM images to the DoD Joint Combat... the approval procedures that on-scene and theater commanders set. (b) Other non-COMCAM images. After...
32 CFR 813.5 - Shipping or transmitting visual information documentation images.
Code of Federal Regulations, 2014 CFR
2014-07-01
... documentation images. 813.5 Section 813.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE... visual information documentation images. (a) COMCAM images. Send COMCAM images to the DoD Joint Combat... the approval procedures that on-scene and theater commanders set. (b) Other non-COMCAM images. After...
Memo: Request for Approval of a Time-Critical Removal Action and $2 Million
The purpose of this Action Memorandum is to request and document approval of a time-critical removal action described herein for the Mississippi Phosphates Corporation Site (Site) located at 601 Industrial Road, Pascagoula, Jackson County, Mississippi.
5 CFR 575.108 - Approval criteria and written determination.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATIONS RECRUITMENT, RELOCATION, AND RETENTION INCENTIVES; SUPERVISORY DIFFERENTIALS; AND EXTENDED ASSIGNMENT INCENTIVES Recruitment Incentives § 575.108 Approval criteria and written determination. (a) For each determination to pay a recruitment incentive under this subpart, an agency must document in...
Arkansas statewide long-range intermodal transportation plan 2007 update
DOT National Transportation Integrated Search
2007-01-01
This Arkansas Statewide Long-Range Intermodal Transportation Plan (2007 Long- Range Plan) is the third long-range plan approved by the Arkansas Highway Commission. The first plan was approved in February 1995 followed by the second document in May 20...
2009-05-01
2009 Approved for public release; distribution unlimited. NOTICES...Approved for public release; distribution unlimited. ii REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden...D’Arcy, Scott Elliott, Thomas Truong, and Michael Davalos 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army
2015-03-01
public release; distribution is unlimited THIS PAGE INTENTIONALLY LEFT BLANK REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public ...AVAILABILITY STATEMENT 12b. DISTRIBUTION CODE Approved for public release; distribution is tmlimited 13. ABSTRACT (maximum 200 words) Nuclear powered...INTENTIONALLY LEFT BLANK Approved for public release; distribution is unlimited UNDERSEA COMMUNICATIONS BETWEEN SUBMARINES AND UNMANNED UNDERSEA VEHICLES IN A
The Sustainment Force Structure Evolution from the Army of Excellence to the Modular Force
2013-12-13
Leavenworth, Kansas 2013-02 Approved for public release ; distribution is unlimited. REPORT DOCUMENTATION PAGE Form Approved OMB No...MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for Public Release ; Distribution is Unlimited 13. SUPPLEMENTARY...into Southwest Asia. Moving two corps of personnel and equipment to the theater of operation would mean a significant stress on the sustainment
Atmospheric Renewable Energy Research, Volume 5 (Solar Radiation Flux Model)
2017-09-01
Approved for public release; distribution is unlimited. ii REPORT DOCUMENTATION PAGE Form Approved OMB No... FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) September 2017 2. REPORT TYPE Technical Report 3. DATES COVERED (From - To) 2017 June 01...3237 Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39.18 Approved for public release; distribution is unlimited. iii Contents List
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-09
...)(xi).... A-I.B.10 D-II.A.5 Baseline Area definition. Yes 51.166(b)(15)....... EPA is approving this... Certain Nonattainment Area Requirements). N/A D-V.A.7.d Documents available for No 51.165(a)(7... Exemptions from Certain Yes 51.165, Appx. EPA is approving this Nonattainment Area S.IV.B... section...
Hybrid Antimicrobial Enzyme and Silver Nanoparticle Coatings for Medical Instruments (Postprint)
2009-01-01
December 2008 DISTRIBUTION A: Approved for release to the public ; distribution unlimited. This work is copyrighted. The United...Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 1 hour per response, including...RXQL AFRL-RX-TY-TP-2008-4630 Distribution Statement A: Approved for public release; distribution unlimited. Document contains color images. Ref
Morimoto, Kazushige; Kawasaki, Satoko; Yoshida, Yasunori
2015-01-01
For 20 years, the Ministry of Health, Labour and Welfare (MHLW, formerly Ministry of Health and Welfare (MHW)) has been trying to increase transparency of the review process for approving reports in order to promote the rational use of newly approved drugs and medical devices. The first Summary Basis of Approval (SBA) was published by MHW in 1994. In 1999, evaluation reports were prepared by MHW and the Pharmaceuticals and Medical Devices Evaluation Center to make them available to the public. In 2005, a notice from the Chief Executive of the Pharmaceuticals and Medical Devices Agency (PMDA) made procedures for public release of information on reviewing applications for new drugs. In 2006, 90 review reports of newly approved drugs and eight medical devices were revealed on PMDA websites. The dissemination of information by the United States Food and Drug Administration (FDA) and that of the European Medicines Agency (EMA) were studied and compared with that of the MHLW and PMDA. While common technical documents (CTD) for new drugs and summary technical documents (STED) for new medical devices have been released by PMDA, such documents are not released by the FDA and EMA. The European Public Assessment Report (EAPR) summary for the public is an interesting questionnaire approach that uses the "What," "How" and "Why" format. Finally, future proposals for the next decade are also outlined.
77 FR 40790 - Flightcrew Member Duty and Rest Requirements; OMB Approval of Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... concerning this document, contact Dale E. Roberts, Air Transportation Division (AFS-200), Flight Standards... (202) 267- 5749; email: dale[email protected] . For legal questions concerning this document, contact...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
.../DevelopmentApprovalProcess/FormsSubmissionRequirements/ElectronicSubmissions/ucm253101.htm , http://www.fda.gov/BiologicsBloodVaccines/GuidanceComplianceRegulatoryInformation/Guidances/default.htm , or http...
Code of Federal Regulations, 2010 CFR
2010-07-01
... have proposed the action for which financial approval is sought. Environmental checklist means a Postal... consideration means the Postal Service form that identifies the Postal Service's review of proposed activities... financial authority to approve such action. The responsible official signs the NEPA documents (FONSI, ROD...
75 FR 17758 - Approved Recovery Plan for the Scaleshell Mussel
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2010-N058; 30120-1113-0000 D2] Approved Recovery Plan for the Scaleshell Mussel AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document availability. [[Page 17759
Code of Federal Regulations, 2010 CFR
2010-10-01
... REGISTERED LENGTH TO OBTAIN A FISHERY ENDORSEMENT TO THE VESSEL'S DOCUMENTATION Charters, Management... bareboat charterer of Fishing Industry Vessel must submit an Affidavit of U.S. Citizenship to the Citizenship Approval Officer for review and approval prior to entering into such charter. (2) Time charters...
Code of Federal Regulations, 2011 CFR
2011-10-01
... REGISTERED LENGTH TO OBTAIN A FISHERY ENDORSEMENT TO THE VESSEL'S DOCUMENTATION Charters, Management... bareboat charterer of Fishing Industry Vessel must submit an Affidavit of U.S. Citizenship to the Citizenship Approval Officer for review and approval prior to entering into such charter. (2) Time charters...
Alternative Renewable Biomass Tracking Program Document under the Renewable Fuel Standard Program
The approval letters that EPA approves a company's biomass tracking program meeting all the requirements outlined in 40 CFR part 80.1454, including elements determined necessary to achieve the level of quality assurance required under the regulation list.
Research ethics board approval for an international thromboprophylaxis trial.
Lutz, Kristina; Wilton, Kelly; Zytaruk, Nicole; Julien, Lisa; Hall, Richard; Harvey, Johanne; Skrobik, Yoanna; Vlahakis, Nicholas; Meade, Laurie; Matte, Andrea; Meade, Maureen; Burns, Karen; Albert, Martin; Cash, Bronwyn Barlow; Vallance, Shirley; Klinger, James; Heels-Ansdell, Diane; Cook, Deborah
2012-06-01
Research ethics board (REB) review of scientific protocols is essential, ensuring participants' dignity, safety, and rights. The objectives of this study were to examine the time from submission to approval, to analyze predictors of approval time, and to describe the scope of conditions from REBs evaluating an international thromboprophylaxis trial. We generated survey items through literature review and investigators' discussions, creating 4 domains: respondent and institutional demographics, the REB application process, and alternate consent models. We conducted a document analysis that involved duplicate assessment of themes from REB critique of the protocol and informed consent forms (ICF). Approval was granted from 65 REB institutions, requiring 58 unique applications. We analyzed 44 (75.9%) of 58 documents and surveys. Survey respondents completing the applications had 8 (5-12) years of experience; 77% completed 4 or more REB applications in previous 5 years. Critical care personnel were represented on 54% of REBs. The time to approval was a median (interquartile range) of 75 (42, 150) days, taking longer for sites with national research consortium membership (89.1 vs 31.0 days, P = .03). Document analysis of the application process and ICF yielded 5 themes: methodology, data management, consent procedures, cataloguing, and miscellaneous. Protocol-specific themes focused on trial implementation, external critiques, and budget. The only theme specific to the ICF was risks and benefits. The most frequent comments on the protocol and ICF were about methodology and miscellaneous issues; ICF comments also addressed study risks and benefits. More studies on methods to enhance efficiency and consistency of the REB approval processes for clinical trials are needed while still maintaining high ethical standards. Copyright © 2012 Elsevier Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... transactions, although these are familiar roles in commercial lending transactions. Accordingly, HUD has... advantage of this language is that it identifies the specific, longstanding, and familiar types of... the documents, HUD is limiting its role and giving lenders more ability to address any problems that...
78 FR 37819 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
.... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR Part 95, Subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 [[Page 37820...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... Tribe of Idaho as an Acceptable Document To Denote Identity and Citizenship AGENCY: U.S. Customs and... to denote identity and citizenship of Kootenai Tribe members entering the United States from... other document or combination of documents as the Secretary deems sufficient to denote identity and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... Management Regulations concerning Open Burning, Permits and Regulation of Volatile Organic Compounds. TDEC... interested in commenting on this document should do so at this time. DATES: Written comments must be received... document. Any parties interested in commenting on this document should do so at this time. Dated: February...
Code of Federal Regulations, 2010 CFR
2010-10-01
... design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and... documents prepared by the Self-Governance Tribe? The Secretary shall have at least one opportunity to...
2010-08-18
the author(s) and should not contrued as an official Department of the Army position, policy or decision, unless so designated by other documentation...Daniel S. Nunez 0.50 Yong-Ting Ma 0.50 Tristan Moody 0.50 1.50FTE Equivalent: 3Total Number: Names of Post Doctorates PERCENT_SUPPORTEDNAME FTE...demonstrated that the constitutive theory for ordered thermofluids of all orders is indeed rate constitutive theory. The reseach work presented in this chapter
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-10
... Boilers and Process Heaters at Petroleum Refineries Correction In rule document 2010-13377 beginning on... limitations for Control [Insert page number any industrial boiler or Requirements. where the document process...
78 FR 78285 - List of Approved Spent Fuel Storage Casks: HI-STORM 100 Cask System; Amendment No. 9
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
...-2012-0052] RIN 3150-AJ12 List of Approved Spent Fuel Storage Casks: HI-STORM 100 Cask System; Amendment... document proposed to amend the NRC's spent fuel storage regulations by revising the Holtec International HI...
77 FR 8865 - Recent Postings of Broadly Applicable Alternative Test Methods
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-15
... Applicable Alternative Test Methods AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the broadly applicable alternative test method approval decisions... INFORMATION CONTACT: An electronic copy of each alternative test method approval document is available on the...
75 FR 7593 - Recent Postings of Broadly Applicable Alternative Test Methods
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... Applicable Alternative Test Methods AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the broadly applicable alternative test method approval decisions... electronic copy of each alternative test method approval document is available on EPA's Web site at http...
78 FR 11174 - Recent Postings of Broadly Applicable Alternative Test Methods
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... Applicable Alternative Test Methods AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the broadly applicable alternative test method approval decisions... INFORMATION CONTACT: An electronic copy of each alternative test method approval document is available on the...
9 CFR 318.309 - Finished product inspection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... microbiological contamination; (2) An FSIS-approved total quality control system; (3) Alternative documented... associated with microbial contamination, where there is no approved total quality control system, or where... Office of Management and Budget under control number 0583-0015) [51 FR 45619, Dec. 19, 1986, as amended...
7 CFR 274.1 - Issuance system approval standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... computer database and electronically accessed by households at the point of sale via reusable plastic cards... submission of advance planning documents (APDs). (1) Pilot project approval requirements. To the extent the State is moving EBT to new technology or incorporating enhancements or upgrades that significantly...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-09
... DEPARTMENT OF TRANSPORTATION National Highway Traffic Safety Administration [U.S. DOT Docket No. NHTSA-2012-0012] Agency Requests Approval To Extend Information Collection(s): Section 410 Alcohol... extend information collection. The collection involves preparation of certifications, and documents...
7 CFR 274.1 - Issuance system approval standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... computer database and electronically accessed by households at the point of sale via reusable plastic cards... submission of advance planning documents (APDs). (1) Pilot project approval requirements. To the extent the State is moving EBT to new technology or incorporating enhancements or upgrades that significantly...
7 CFR 274.1 - Issuance system approval standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... computer database and electronically accessed by households at the point of sale via reusable plastic cards... submission of advance planning documents (APDs). (1) Pilot project approval requirements. To the extent the State is moving EBT to new technology or incorporating enhancements or upgrades that significantly...
7 CFR 274.1 - Issuance system approval standards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... computer database and electronically accessed by households at the point of sale via reusable plastic cards... submission of advance planning documents (APDs). (1) Pilot project approval requirements. To the extent the State is moving EBT to new technology or incorporating enhancements or upgrades that significantly...
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
van Doorn, Eva; Hak, Eelko; Wilffert, Bob
2015-01-01
Obtaining approval for a multinational vaccine trial from an ethics committee and the national competent authority of different Member States of the European Union (EU) is challenging under clinical trial Directive 2001/20/EC because of the differences in the implementation of the directive in national laws of Member States. In this review the national differences in requirements for ethical and competent authority approval are illustrated. The national ethical and competent authority review procedures in Finland, Hungary, The Netherlands, Norway and Slovenia are described under the EU trial directive after discussing the provisions of the trial directive related to both review procedures. The review illustrates the differences between the countries in the documents that have to be submitted for the review procedures, the submission procedures and the language requirements of the documents, the organization of the ethics committees and the role of the competent authority in the approval procedure. PMID:26343188
van Doorn, Eva; Hak, Eelko; Wilffert, Bob
2015-04-14
Obtaining approval for a multinational vaccine trial from an ethics committee and the national competent authority of different Member States of the European Union (EU) is challenging under clinical trial Directive 2001/20/EC because of the differences in the implementation of the directive in national laws of Member States. In this review the national differences in requirements for ethical and competent authority approval are illustrated. The national ethical and competent authority review procedures in Finland, Hungary, The Netherlands, Norway and Slovenia are described under the EU trial directive after discussing the provisions of the trial directive related to both review procedures. The review illustrates the differences between the countries in the documents that have to be submitted for the review procedures, the submission procedures and the language requirements of the documents, the organization of the ethics committees and the role of the competent authority in the approval procedure.
Köhler, Michael; Haag, Susanne; Biester, Katharina; Brockhaus, Anne Catharina; McGauran, Natalie; Grouven, Ulrich; Kölsch, Heike; Seay, Ulrike; Hörn, Helmut; Moritz, Gregor; Staeck, Kerstin
2015-01-01
Background When a new drug becomes available, patients and doctors require information on its benefits and harms. In 2011, Germany introduced the early benefit assessment of new drugs through the act on the reform of the market for medicinal products (AMNOG). At market entry, the pharmaceutical company responsible must submit a standardised dossier containing all available evidence of the drug’s added benefit over an appropriate comparator treatment. The added benefit is mainly determined using patient relevant outcomes. The “dossier assessment” is generally performed by the Institute for Quality and Efficiency in Health Care (IQWiG) and then published online. It contains all relevant study information, including data from unpublished clinical study reports contained in the dossiers. The dossier assessment refers to the patient population for which the new drug is approved according to the summary of product characteristics. This patient population may comprise either the total populations investigated in the studies submitted to regulatory authorities in the drug approval process, or the specific subpopulations defined in the summary of product characteristics (“approved subpopulations”). Objective To determine the information gain from AMNOG documents compared with non-AMNOG documents for methods and results of studies available at market entry of new drugs. AMNOG documents comprise dossier assessments done by IQWiG and publicly available modules of company dossiers; non-AMNOG documents comprise conventional, publicly available sources—that is, European public assessment reports, journal publications, and registry reports. The analysis focused on the approved patient populations. Design Retrospective analysis. Data sources All dossier assessments conducted by IQWiG between 1 January 2011 and 28 February 2013 in which the dossiers contained suitable studies allowing for a full early benefit assessment. We also considered all European public assessment reports, journal publications, and registry reports referring to these studies and included in the dossiers. Data analysis We assessed reporting quality for each study and each available document for eight methods and 11 results items (three baseline characteristics and eight patient relevant outcomes), and dichotomised them as “completely reported” or “incompletely reported (including items not reported at all).” For each document type we calculated the proportion of items with complete reporting for methods and results, for each item and overall, and compared the findings. Results 15 out of 27 dossiers were eligible for inclusion and contained 22 studies. The 15 dossier assessments contained 28 individual assessments of 15 total study populations and 13 approved subpopulations. European public assessment reports were available for all drugs. Journal publications were available for 14 out of 15 drugs and 21 out of 22 studies. A registry report in ClinicalTrials.gov was available for all drugs and studies; however, only 11 contained results. In the analysis of total study populations, the AMNOG documents reached the highest grade of completeness, with about 90% of methods and results items completely reported. In non-AMNOG documents, the rate was 75% for methods and 52% for results items; journal publications achieved the best rates, followed by European public assessment reports and registry reports. The analysis of approved subpopulations showed poorer complete reporting of results items, particularly in non-AMNOG documents (non-AMNOG versus AMNOG: 11% v 71% for overall results items and 5% v 70% for patient relevant outcomes). The main limitation of our analysis is the small sample size. Conclusion Conventional, publicly available sources provide insufficient information on new drugs, especially on patient relevant outcomes in approved subpopulations. This type of information is largely available in AMNOG documents, albeit only partly in English. The AMNOG approach could be used internationally to develop a comprehensive publication model for clinical studies and thus represents a key open access measure. PMID:25722024
Köhler, Michael; Haag, Susanne; Biester, Katharina; Brockhaus, Anne Catharina; McGauran, Natalie; Grouven, Ulrich; Kölsch, Heike; Seay, Ulrike; Hörn, Helmut; Moritz, Gregor; Staeck, Kerstin; Wieseler, Beate
2015-02-26
When a new drug becomes available, patients and doctors require information on its benefits and harms. In 2011, Germany introduced the early benefit assessment of new drugs through the act on the reform of the market for medicinal products (AMNOG). At market entry, the pharmaceutical company responsible must submit a standardised dossier containing all available evidence of the drug's added benefit over an appropriate comparator treatment. The added benefit is mainly determined using patient relevant outcomes. The "dossier assessment" is generally performed by the Institute for Quality and Efficiency in Health Care (IQWiG) and then published online. It contains all relevant study information, including data from unpublished clinical study reports contained in the dossiers. The dossier assessment refers to the patient population for which the new drug is approved according to the summary of product characteristics. This patient population may comprise either the total populations investigated in the studies submitted to regulatory authorities in the drug approval process, or the specific subpopulations defined in the summary of product characteristics ("approved subpopulations"). To determine the information gain from AMNOG documents compared with non-AMNOG documents for methods and results of studies available at market entry of new drugs. AMNOG documents comprise dossier assessments done by IQWiG and publicly available modules of company dossiers; non-AMNOG documents comprise conventional, publicly available sources-that is, European public assessment reports, journal publications, and registry reports. The analysis focused on the approved patient populations. Retrospective analysis. All dossier assessments conducted by IQWiG between 1 January 2011 and 28 February 2013 in which the dossiers contained suitable studies allowing for a full early benefit assessment. We also considered all European public assessment reports, journal publications, and registry reports referring to these studies and included in the dossiers. We assessed reporting quality for each study and each available document for eight methods and 11 results items (three baseline characteristics and eight patient relevant outcomes), and dichotomised them as "completely reported" or "incompletely reported (including items not reported at all)." For each document type we calculated the proportion of items with complete reporting for methods and results, for each item and overall, and compared the findings.Results 15 out of 27 dossiers were eligible for inclusion and contained 22 studies. The 15 dossier assessments contained 28 individual assessments of 15 total study populations and 13 approved subpopulations. European public assessment reports were available for all drugs. Journal publications were available for 14 out of 15 drugs and 21 out of 22 studies. A registry report in ClinicalTrials.gov was available for all drugs and studies; however, only 11 contained results. In the analysis of total study populations, the AMNOG documents reached the highest grade of completeness, with about 90% of methods and results items completely reported. In non-AMNOG documents, the rate was 75% for methods and 52% for results items; journal publications achieved the best rates, followed by European public assessment reports and registry reports. The analysis of approved subpopulations showed poorer complete reporting of results items, particularly in non-AMNOG documents (non-AMNOG versus AMNOG: 11% v 71% for overall results items and 5% v 70% for patient relevant outcomes). The main limitation of our analysis is the small sample size. Conventional, publicly available sources provide insufficient information on new drugs, especially on patient relevant outcomes in approved subpopulations. This type of information is largely available in AMNOG documents, albeit only partly in English. The AMNOG approach could be used internationally to develop a comprehensive publication model for clinical studies and thus represents a key open access measure. © Köhler et al 2015.
10 CFR 820.36 - Filing, form, and service of documents.
Code of Federal Regulations, 2014 CFR
2014-01-01
... representative. The signature constitutes a representation by the signer that he has read the pleading, letter or other document, that to the best of his knowledge, information and belief, the statements made therein...
10 CFR 820.36 - Filing, form, and service of documents.
Code of Federal Regulations, 2012 CFR
2012-01-01
... representative. The signature constitutes a representation by the signer that he has read the pleading, letter or other document, that to the best of his knowledge, information and belief, the statements made therein...
10 CFR 820.36 - Filing, form, and service of documents.
Code of Federal Regulations, 2013 CFR
2013-01-01
... representative. The signature constitutes a representation by the signer that he has read the pleading, letter or other document, that to the best of his knowledge, information and belief, the statements made therein...
10 CFR 820.36 - Filing, form, and service of documents.
Code of Federal Regulations, 2011 CFR
2011-01-01
... representative. The signature constitutes a representation by the signer that he has read the pleading, letter or other document, that to the best of his knowledge, information and belief, the statements made therein...
2017-12-19
Firing System for Electromagnetic Pulsed Power Experiments by Robert Borys Jr and Colby Adams Approved for public release...Belcamp, MD Approved for public release; distribution is unlimited. ii REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188... Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions
Performance, Resources, and Complexity: A Systematic Approach to Microarchitectural Design
1989-05-01
Approved: ********************************** Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of...Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT VLSI design in general -- microprocessor design in particular...has been treated more like an art than a science in the past. The goal of this thesis is to explain the science of VLSI design to someone who wants
Modern Warfare From the Colombian Perspective
2008-01-01
Approved: ~-e::::- - Date: 1?’ r;>-- Zd’.tf? r . Oral Defense Committee Member:~f).~ r~::Y· Approved: ...----- .) Date: 8’ ,«4’"\\ 260& Report Documentation...Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including...reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports , 1215 Jefferson Davis Highway, Suite 1204
The Use of Model-Driven Methodologies and Processes in Aegis Development
2011-05-17
Jamie.Durbin@lmco.com Christopher.M.Thompson@lmco.com May 17, 2011 Distribution Statement A: Approved for Public Release. Distribution is unlimited...Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per...AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES Presented at the 23rd Systems and Software
Lysozyme Catalyzes the Formation of Antimicrobial Silver Nanoparticles
2009-04-03
FL 32403-5323 DECEMBER 2008 Distribution Statement A: Approved for public release; distribution unlimited. This work has been published by the...Rev. 8/98) REPORT DOCUMENTATION PAGE Prescribed by ANSI Std. Z39.18 Form Approved OMB No. 0704-0188 The public reporting burden for this...AFRL/RXQL AFRL-RX-TY-TP-2008-4590 Distribution Statement A: Approved for public release; distribution unlimited. Ref AFRL/RXQ Public Affairs Case
A planning support system to optimize approval of private housing development projects
NASA Astrophysics Data System (ADS)
Hussnain, M. Q.; Wakil, K.; Waheed, A.; Tahir, A.
2016-06-01
Out of 182 million population of Pakistan, 38% reside in urban areas having an average growth rate of 1.6%, raising the urban housing demand significantly. Poor state response to fulfil the housing needs has resulted in a mushroom growth of private housing schemes (PHS) over the years. Consequently, only in five major cities of Punjab, there are 383 legal and 150 illegal private housing development projects against 120 public sector housing schemes. A major factor behind the cancerous growth of unapproved PHS is the prolonged and delayed approval process in concerned approval authorities requiring 13 months on average. Currently, manual and paper-based approaches are used for vetting and for granting the permission which is highly subjective and non-transparent. This study aims to design a flexible planning support system (PSS) to optimize the vetting process of PHS projects under any development authority in Pakistan by reducing time and cost required for site and documents investigations. Relying on the review of regulatory documents and interviews with professional planners and land developers, this study describes the structure of a PSS developed using open- source geo-spatial tools such as OpenGeo Suite, PHP, and PostgreSQL. It highlights the development of a Knowledge Module (based on regulatory documents) containing equations related to scheme type, size (area), location, access road, components of layout plan, planning standards and other related approval checks. Furthermore, it presents the architecture of the database module and system data requirements categorized as base datasets (built-in part of PSS) and input datasets (related to the housing project under approval). It is practically demonstrated that developing a customized PSS to optimize PHS approval process in Pakistan is achievable with geospatial technology. With the provision of such a system, the approval process for private housing schemes not only becomes quicker and user-friendly but also transparent.
The use of Food and Drug Administration 510(k) notifications in patent litigation.
Tolomeo, Deborah E
2004-01-01
The U.S. Food and Drug Administration (FDA) 510(k) approval process provides medical device companies with the ability to market a device after the company establishes that the device to the marketed is "substantially equivalent" to one or more predicate devices. Companies that submit 510(k) notifications should be aware, however, that a 510(k) notification is a public document that may later reappear as evidence in patent litigation. Courts have considered 510(k) notifications to be relevant evidence in determining direct and contributory infringement, patent invalidity, and patent unenforceability due to inequitable conduct before the U.S. Patent and Trademark Office (USPTO). In one case, the court held that a substantial equivalence determination by FDA constituted evidence that can be "construed as an admission of infringement." The court also has relied on a 510(k) notification to support a finding of personal liability for a corporate officer who signed the 510(k) notification to be evidence of willful and deliberate conduct, and have awarded treble damages and reasonable attorney's fees to the prevailing party. The potential for increased risk in patent litigation is important for practitioners in the medical device industry, because more than seventy-five percent of medical devices are approved for marketing through the 510(k) process. This article reviews a number of patent cases in which a court has admitted a 510(k) notification as relevant evidence, and proposes general strategies for avoiding these situations.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
... Organizations; The Options Clearing Corporation; Order Granting Approval of Accelerated Delivery of Supplement to the Options Disclosure Document Reflecting Certain Changes to Disclosure Regarding Relative Performance Options January 19, 2012. On August 15, 2011, The Options Clearing Corporation (``OCC'') submitted...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... RECOVERY ACCOUNTABILITY AND TRANSPARENCY BOARD Agency Information Collection Activities: Renewal of Currently Approved Collection; Comment Request Correction In notice document 2012-30952, appearing on page 76097, in the issue of Wednesday, December 26, 2012, make the following correction: In the...
9 CFR 381.309 - Finished product inspection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... FSIS-approved total quality control system; or (3) Alternative documented procedures that will ensure... contamination, where there is no approved total quality control system, or where the establishment has no... Office of Management and Budget under control number 0583-0015) [51 FR 45634, Dec. 19, 1986, as amended...
77 FR 43082 - Federal Acquisition Regulation; Information Collection; Commerce Patent Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... Proposals: Requesters may obtain a copy of the information collection documents from the General Services...; Information Collection; Commerce Patent Regulations AGENCIES: Department of Defense (DOD), General Services... Budget (OMB) a request to review and approve an extension of a previously approved information collection...
40 CFR 52.220 - Identification of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Pollution Control District. (i) Previously approved on September 22, 1972 and now deleted without... and other Legal Documents Pertinent to Air Pollution Control in California”) to chapter 7. (13) El Dorado County Air Pollution Control District. (i) Previously approved on May 31, 1972 in paragraph (b) of...
40 CFR 52.220 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., 43, and 44. (5) Ventura County Air Pollution Control District. (i) Previously approved on September... (“State Statutes and other Legal Documents Pertinent to Air Pollution Control in California”) to chapter 7. (13) El Dorado County Air Pollution Control District. (i) Previously approved on May 31, 1972 in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... Activities: Requests for Comments; Clearance of Renewed Approval of Information Collection: Aircraft Noise.... 76, page 23628. This collection ensures that U.S. operators have proper noise certification...: 2120-0737. Title: Aircraft Noise Certification Documents for International Operations. Form Numbers...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
... Activities; Requests for Comments; Clearance of Renewed Approval of Information Collection: Aircraft Noise... to renew an information collection. This collection ensures that U.S. operators have proper noise...: OMB Control Number: 2120-073. Title: Aircraft Noise Certification Documents for International...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-30
... Promulgation of Implementation Plans; Illinois; Volatile Organic Compound Emission Control Measures for Chicago... Act's (the Act) requirement that States revise their SIPs to include reasonably available control... rules are approvable because they are consistent with the Control Technique Guideline (CTG) documents...
46 CFR 221.11 - Required approvals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... operated, if the vessel has been designed and built and will be operated for one or more of the following... ACTIVITIES REGULATED TRANSACTIONS INVOLVING DOCUMENTED VESSELS AND OTHER MARITIME INTERESTS Transfers to... approval of the Maritime Administrator: (1) Sell, lease, charter, deliver, or in any manner Transfer to a...
76 FR 60774 - Review and Approval of Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY: Susquehanna River Basin Commission. ACTION: Notice of proposed rulemaking; reopening of comment period. SUMMARY: The purpose of this document is to inform the public of an extension of the comment period for...
48 CFR 2945.105 - Records of Government property.
Code of Federal Regulations, 2014 CFR
2014-10-01
... the GFP; (b) Contracting officer's letters assigning the GFP administrator to the contract; (c) Written evidence that the contractor's property control system was reviewed and approved as required by FAR 45.104; (d) If applicable, documentation of the request and approval or denial of the contractor's...
48 CFR 2945.105 - Records of Government property.
Code of Federal Regulations, 2013 CFR
2013-10-01
... the GFP; (b) Contracting officer's letters assigning the GFP administrator to the contract; (c) Written evidence that the contractor's property control system was reviewed and approved as required by FAR 45.104; (d) If applicable, documentation of the request and approval or denial of the contractor's...
29 CFR 1956.52 - Completed developmental steps and certification.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Substances Act; and the State's independent Workplace Violence Prevention law, were approved by the Assistant...) Survey of Injuries and Illnesses to the public sector. A supplement documenting this action was approved... initially promulgated regulations for injury/illness recordkeeping, equivalent to 29 CFR part 1904, which...
29 CFR 1956.52 - Completed developmental steps and certification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Substances Act; and the State's independent Workplace Violence Prevention law, were approved by the Assistant...) Survey of Injuries and Illnesses to the public sector. A supplement documenting this action was approved... initially promulgated regulations for injury/illness recordkeeping, equivalent to 29 CFR part 1904, which...
29 CFR 1956.52 - Completed developmental steps and certification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Substances Act; and the State's independent Workplace Violence Prevention law, were approved by the Assistant...) Survey of Injuries and Illnesses to the public sector. A supplement documenting this action was approved... initially promulgated regulations for injury/illness recordkeeping, equivalent to 29 CFR part 1904, which...
29 CFR 1956.52 - Completed developmental steps and certification.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Substances Act; and the State's independent Workplace Violence Prevention law, were approved by the Assistant...) Survey of Injuries and Illnesses to the public sector. A supplement documenting this action was approved... initially promulgated regulations for injury/illness recordkeeping, equivalent to 29 CFR part 1904, which...
DARHT: INTEGRATION OF AUTHORIZATION BASIS REQUIREMENTS AND WORKER SAFETY
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. A. MC CLURE; C. A. NELSON; R. L. BOUDRIE
2001-04-01
This document describes the results of consensus agreements reached by the DARHT Safety Planning Team during the development of the update of the DARHT Safety Analysis Document (SAD). The SAD is one of the Authorization Basis (AB) Documents required by the Department prior to granting approval to operate the DARHT Facility. The DARHT Safety Planning Team is lead by Mr. Joel A. Baca of the Department of Energy Albuquerque Operations Office (DOE/AL). Team membership is drawn from the Department of Energy Albuquerque Operations Office, the Department of Energy Los Alamos Area Office (DOE/LAAO), and several divisions of the Los Alamosmore » National Laboratory. Revision 1 of the DARHT SAD had been written as part of the process for gaining approval to operate the Phase 1 (First Axis) Accelerator. Early in the planning stage for the required update of the SAD for the approval to operate both Phase 1 and Phase 2 (First Axis and Second Axis) DARHT Accelerator, it was discovered that a conflict existed between the Laboratory approach to describing the management of facility and worker safety.« less
This document is the United States Environmental Protection Agency, Region 2's (EPA Region 2) response to and approval of the request for a risk-based disposal of polychlorinated biphenyl (PCB) remediation waste (as defined at 40 C.F.R. §761.3).
ERIC Educational Resources Information Center
Baxter, Maurice
Changing political, social, economic, and intellectual conditions over the past two hundred years have demanded innovation and adjustment of legal doctrine, thus giving the United States Constitution a character which the framers of the document could not have predicted. Historically, one must not only understand developments since 1787 but also…
25 CFR 162.533 - Must a WEEL lease document be recorded?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Must a WEEL lease document be recorded? 162.533 Section 162.533 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER LEASES AND PERMITS Wind and Solar Resource Leases Weel Approval § 162.533 Must a WEEL lease document be recorded? (a) Any...
25 CFR 162.568 - Must a WSR lease document be recorded?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Must a WSR lease document be recorded? 162.568 Section 162.568 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER LEASES AND PERMITS Wind and Solar Resource Leases Wsr Lease Approval § 162.568 Must a WSR lease document be recorded? (a...
25 CFR 162.533 - Must a WEEL lease document be recorded?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Must a WEEL lease document be recorded? 162.533 Section 162.533 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER LEASES AND PERMITS Wind and Solar Resource Leases Weel Approval § 162.533 Must a WEEL lease document be recorded? (a) Any...
25 CFR 162.568 - Must a WSR lease document be recorded?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Must a WSR lease document be recorded? 162.568 Section 162.568 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER LEASES AND PERMITS Wind and Solar Resource Leases Wsr Lease Approval § 162.568 Must a WSR lease document be recorded? (a...
36 CFR § 1234.3 - What publications are incorporated by reference in this part?
Code of Federal Regulations, 2013 CFR
2013-07-01
... reseller the Document Center Inc., 111 Industrial Road, Suite 9, Belmont, CA, 94002, phone number (650) 591...—Storage, September 6, 1996, IBR approved for § 1234.14. (e) Document Engineering Co., Inc. (DECO). The following standards are available from the standards reseller DECO—Document Engineering Co., Inc., 15210...
USDA-ARS?s Scientific Manuscript database
The supplemental information presented in this document is intended for use with the antimicrobial susceptibility testing procedures published in the following Clinical and Laboratory Standards Institute (CLSI) approved documents VET03-A Methods for Antimicrobial Disk Susceptibility Testing of Bacte...
Assessment of Beddown Alternatives for the F-35
2013-01-01
For More Information Visit RAND at www.rand.org Explore the RAND Corporation View document details Support RAND Purchase this document Browse Reports...copyright law. Permission is required from RAND to reproduce, or reuse in another form, any of our research documents for commercial use. For information ...HOMELAND SECURITY Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to
12 CFR 163.74 - Mutual capital certificates.
Code of Federal Regulations, 2014 CFR
2014-01-01
... amend the terms of such certificates unless it has obtained written approval of the appropriate Federal... section. (b) Eligibility Requirements. The appropriate Federal banking agency will consider and process an... applicant's charter, constitution or bylaws. (c) Application form; supporting information. An application...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
...In compliance with the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR, which is abstracted below, describes the nature of the information collection and its estimated burden and cost.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
...In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-08
...In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-17
...In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-02
...In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-11
...In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-15
...In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
Atmospheric Renewable Energy Research, Volume 3: Solar-Power Microgrids and Atmospheric Influences
2016-09-01
Approved for public release; distribution unlimited. ii REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting...with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1...code) 575-678-3237 Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39.18 Approved for public release; distribution is unlimited. iii
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
...In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost.
2009-06-01
M. Harkins Approved for public release; distribution is unlimited THIS PAGE INTENTIONALLY LEFT BLANK i REPORT DOCUMENTATION PAGE Form Approved...12a. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public release; distribution is unlimited 12b. DISTRIBUTION CODE 13. ABSTRACT (maximum 200...The integration of a MWIR signature into VMIFF will add a daytime capability. A new generation of compact MWIR sources is emerging to meet demands
Integrative Lifecourse and Genetic Analysis of Military Working Dogs
2013-10-01
Working Dogs 5a. CONTRACT NUMBER 5b. GRANT NUMBER W81XWH-11-2-0225 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) C. Guillermo Couto, DVM, Diplomate...protocol for the collection of biological samples and Lackland veterinary approval was granted ; and final Lackland AFB oversight approval was granted and...those documents were submitted to DoD CDMRP grant administration. Currently, there is one final approval from ACURO pending (and expected
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-06
... CONSUMER PRODUCT SAFETY COMMISSION Proposed Extension of Approval of Information Collection; Comment Request--Baby Bouncers and Walker-Jumpers AGENCY: Consumer Product Safety Commission. ACTION...-bouncers and walker-jumpers. This document was published in the Federal Register of June 20, 2012, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... CONSUMER PRODUCT SAFETY COMMISSION [Docket No. CPSC-2012-0038] Proposed Extension of Approval of Information Collection; Comment Request--Baby Bouncers and Walker-Jumpers AGENCY: Consumer Product Safety... walker-jumpers. This document was published in the Federal Register of September 5, 2012, and contains an...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-01
... May 14, 2010. The ODD currently contains general disclosures on the characteristics and risks of...-linked securities. Accordingly, the ODD disclosure only covers the characteristics and risks of options...; Order Granting Approval of Accelerated Delivery of Supplement to the Options Disclosure Document...
21 CFR 514.8 - Supplements and other changes to an approved application.
Code of Federal Regulations, 2013 CFR
2013-04-01
... method(s) or an addition, deletion, or substitution of steps in an aseptic processing operation; (D... solely affecting a natural product, a recombinant DNA-derived protein/polypeptide, or a complex or...) or references to previously approved documentation; (H) For a natural product, a recombinant DNA...
21 CFR 514.8 - Supplements and other changes to an approved application.
Code of Federal Regulations, 2014 CFR
2014-04-01
... method(s) or an addition, deletion, or substitution of steps in an aseptic processing operation; (D... solely affecting a natural product, a recombinant DNA-derived protein/polypeptide, or a complex or...) or references to previously approved documentation; (H) For a natural product, a recombinant DNA...
21 CFR 514.8 - Supplements and other changes to an approved application.
Code of Federal Regulations, 2012 CFR
2012-04-01
... method(s) or an addition, deletion, or substitution of steps in an aseptic processing operation; (D... solely affecting a natural product, a recombinant DNA-derived protein/polypeptide, or a complex or...) or references to previously approved documentation; (H) For a natural product, a recombinant DNA...
36 CFR 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2011 CFR
2011-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
36 CFR 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2012 CFR
2012-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
36 CFR 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2014 CFR
2014-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
36 CFR 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2010 CFR
2010-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-06
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2012-0381; FRL-9747-9] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Requirements for Prevention of Significant...: Environmental Protection Agency (EPA). ACTION: Final rule; correcting amendment. SUMMARY: This document corrects...
40 CFR 52.220 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., Rules 40, 42, 43, and 44. (5) Ventura County Air Pollution Control District. (i) Previously approved on... contained in appendix II (“State Statutes and other Legal Documents Pertinent to Air Pollution Control in California”) to chapter 7. (13) El Dorado County Air Pollution Control District. (i) Previously approved on...
40 CFR 52.220 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., Rules 40, 42, 43, and 44. (5) Ventura County Air Pollution Control District. (i) Previously approved on... (“State Statutes and other Legal Documents Pertinent to Air Pollution Control in California”) to chapter 7. (13) El Dorado County Air Pollution Control District. (i) Previously approved on May 31, 1972 in...
78 FR 22877 - Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-17
... Bank has developed an electronic disbursement approval processing system for guaranteed lenders with... authorized by Ex-Im Bank and legal documentation has been completed, the lender will obtain and review the... application system (ExIm Online). Ex-Im Bank's action (approved or declined) will be posted on the lender's...
78 FR 10169 - Agency Information Collection Activities: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... Bank has developed an electronic disbursement approval processing system for guaranteed lenders with... authorized by Ex-Im Bank and legal documentation has been completed, the lender will obtain and review the... application system (ExIm Online). Ex-Im Bank's action (approved or declined) will be posted on the lender's...
78 FR 38912 - Notice of Request for Revision of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-28
... immediate production and marketing decisions and as a guide to the amount of product in the supply channel... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Document No. AMS-FV-13-0022] Notice of Request for Revision of a Currently Approved Information Collection AGENCY: Agricultural Marketing Service...
75 FR 32355 - Notice of Request for Revision of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Document No. AMS-FV-10-0040] Notice of Request for Revision of a Currently Approved Information Collection AGENCY: Agricultural Marketing Service... of 1995 (44 U.S.C. Chapter 35), this notice announces the Agricultural Marketing Service's (AMS...
33 CFR 157.12g - Plan approval requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OIL IN BULK Design, Equipment, and Installation § 157.12g Plan approval requirements. Adequate documentation must be prepared well in advance of the intended installation of a monitoring system and must be... ballast handling manuals. Special considerations will be given to installations in oil tankers, which have...
78 FR 30385 - Approval of Noise Compatibility Program for Tweed-New Haven Regional Airport
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... use of flight procedures can be implemented within the period covered by the program without... maps, descriptions, and other documentation produced during the noise compatibility planning study... 180 days (other than the use of new flight procedures for noise control). Failure to approve or...
22 CFR 42.41 - Effect of approved petition.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Effect of approved petition. 42.41 Section 42.41 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF IMMIGRANTS UNDER THE... officer that the alien is eligible in all respects to receive a visa. [56 FR 49682, Oct. 1, 1991] ...
22 CFR 42.41 - Effect of approved petition.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Effect of approved petition. 42.41 Section 42.41 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF IMMIGRANTS UNDER THE... officer that the alien is eligible in all respects to receive a visa. [56 FR 49682, Oct. 1, 1991] ...
22 CFR 41.56 - Athletes, artists and entertainers.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Section 41.56 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Business and Media Visas § 41.56 Athletes, artists and... join the principal alien. (b) Approval of visa. The approval of a petition by DHS does not establish...
22 CFR 42.41 - Effect of approved petition.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Effect of approved petition. 42.41 Section 42.41 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF IMMIGRANTS UNDER THE... officer that the alien is eligible in all respects to receive a visa. [56 FR 49682, Oct. 1, 1991] ...
22 CFR 41.56 - Athletes, artists and entertainers.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Section 41.56 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Business and Media Visas § 41.56 Athletes, artists and... join the principal alien. (b) Approval of visa. The approval of a petition by DHS does not establish...
22 CFR 41.56 - Athletes, artists and entertainers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Section 41.56 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Business and Media Visas § 41.56 Athletes, artists and... join the principal alien. (b) Approval of visa. The approval of a petition by DHS does not establish...
22 CFR 41.56 - Athletes, artists and entertainers.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Section 41.56 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Business and Media Visas § 41.56 Athletes, artists and... join the principal alien. (b) Approval of visa. The approval of a petition by DHS does not establish...
22 CFR 42.41 - Effect of approved petition.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Effect of approved petition. 42.41 Section 42.41 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF IMMIGRANTS UNDER THE... officer that the alien is eligible in all respects to receive a visa. [56 FR 49682, Oct. 1, 1991] ...
22 CFR 41.56 - Athletes, artists and entertainers.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Section 41.56 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Business and Media Visas § 41.56 Athletes, artists and... join the principal alien. (b) Approval of visa. The approval of a petition by DHS does not establish...
22 CFR 42.41 - Effect of approved petition.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Effect of approved petition. 42.41 Section 42.41 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF IMMIGRANTS UNDER THE... officer that the alien is eligible in all respects to receive a visa. [56 FR 49682, Oct. 1, 1991] ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-30
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration 21 CFR Part 870 [Docket No. FDA-2011-N-0505] Effective Date of Requirement for Premarket Approval for Cardiovascular Permanent... preamendments device: Cardiovascular permanent pacemaker electrode. The document was published with an incorrect...
50 CFR Appendix B to Part 404 - Approved VMS
Code of Federal Regulations, 2014 CFR
2014-10-01
... Inmarsat-C system use contract with an approved Inmarsat-C communications service provider. The owner will be required to complete the Inmarsat-C “Registration for Service Activation for Maritime Mobile Earth... documentation or registration number; and (9) mobile earth station license (FCC license). The OLE will provide...
76 FR 55288 - Capital Plans; Proposed Agency Information Collection Activities: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-07
... and revenues. This is organized similar to, but not identical to, the mandatory Consolidated Financial... statements and approved collection of information instruments are placed into OMB's public docket files. The... statement, and other documentation will be placed into OMB's public docket files, once approved. These...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-30
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-61716; File No. SR-CBOE-2010-008] Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Order Approving a Proposed Rule Change Relating to Co- location Service Fees March 16, 2010. Correction In notice document 2010-6184...
NPDES Petition for Program Withdrawal in Minnesota: Documents related to the Minnesota Center for Environmental Advocacy (MCEA) Petition for Corrective Action or Withdrawal of NPDES Program Approval from the State of Minnesota.
List of application documents for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).
Code of Federal Regulations, 2011 CFR
2011-07-01
... adequate documentation of IRB activities, including the following: (1) Copies of all research proposals reviewed, scientific evaluations, if any, that accompany the proposals, approved sample consent documents... basis for requiring changes in or disapproving research; and a written summary of the discussion of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... adequate documentation of IRB activities, including the following: (1) Copies of all research proposals reviewed, scientific evaluations, if any, that accompany the proposals, approved sample consent documents... basis for requiring changes in or disapproving research; and a written summary of the discussion of...
Code of Federal Regulations, 2011 CFR
2011-10-01
... adequate documentation of IRB activities, including the following: (1) Copies of all research proposals reviewed, scientific evaluations, if any, that accompany the proposals, approved sample consent documents... basis for requiring changes in or disapproving research; and a written summary of the discussion of...
46 CFR 11.301 - Requirements for STCW officer endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... specialist. (vii) Workshop skills training: Documentation of successful completion of assessments or... engineering—as appropriate. (ii) Training ship experience: Documentation of successful completion of an approved training program involving formal training and assessment onboard a training ship. (iii) Simulator...
Approval of Local Implementation Plans
This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Extension of Interim Approvals of Operating Permits Programs
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Operating Permit Program Approval Issues
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Interim Title V Program Approvals
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
An informatics approach to chronicling the history of IMIA.
Kulikowski, Casimir A; McGrew, Charles
2013-01-01
With the 50th Anniversary of IMIA approaching in 2017, the IMIA Board approved the creation of a Taskforce for compiling materials and writing a history of the organization. As part of the work of the Taskforce, the authors have developed informatics tools, and begun collecting IMIA-related historical materials from its members, while soliciting participation and contributions from those involved in the early days of the organization and its predecessor IFIP-TC4. This poster describes the structure and preliminary contents of the media mining and presentation tools designed at Rutgers University for use by the IMIA History Editorial Board, being constituted to produce the 50th Anniversary publication, as well as an online archive of materials chronicling the evolution of IMIA. A major feature of the data repository is its ability to present different modalities of textual, visual and graphical (timelines, trends) summarizations for the IMIA document collection. It will be augmented with audio material, and will serve as an archival repository for historical research, including software tools for text analysis and extraction of the information entering into the 50th Anniversary volume.
List of finla permit documents for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).
Anual Report of Groundwater Monitoring at Centralia, Kansas, in 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
2016-10-01
The KDHE (2012) agreed to annual sampling at all locations, beginning with the 2013 monitoring documented previously (Argonne 2014a). This present report documents the results of the annual sampling of the approved monitoring well network on September 27-30, 2015.
Patternmaker. Apprenticeship Training Standards.
ERIC Educational Resources Information Center
Ontario Ministry of Skills Development, Toronto.
This training document outlines the apprenticeship training standards for the trade of patternmaker that have been approved by the Ontario Ministry of Skills Development. The document consists of the following: (1) skills (competencies) identified by a trade analysis development group of practicing patternmakers; (2) general performance objectives…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E&E-APD); Use: Under... Eligibility/Enrollment Systems APD approval assignment. The information requested on the Checklist will be... an Expedited Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E& -APD...
3D Laser Scanner Data Collection
2007-09-01
advertising , publication, or promotional purposes. Citation of trade names does not constitute an official endorsement or approval of the use of such...of Temperate Site D depicting vegetation height in meters. The image portrays a chromatic sequence with lower vegetation heights appearing blue and
What English Language Learners Have to Say about NCLB Testing
ERIC Educational Resources Information Center
Yee, Mary
2015-01-01
This study constitutes the secondary analysis of data collected as part of classroom instruction in a prior practitioner inquiry study. Consequently, IRB approval, parental consent, and participant assent for the present study were obtained after the conclusion of the original study.
Code of Federal Regulations, 2011 CFR
2011-04-01
... following reasons: (a) HUD determines that the guarantee constitutes an unacceptable risk. Factors that will be considered in assessing financial risk shall include, but not be limited to, the following: (1...
Code of Federal Regulations, 2010 CFR
2010-04-01
... following reasons: (a) HUD determines that the guarantee constitutes an unacceptable risk. Factors that will be considered in assessing financial risk shall include, but not be limited to, the following: (1...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-29
... online viewing at http://www.regulations.gov , or in person viewing at the Air and Radiation Docket, in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Ave. NW., Washington, DC. Joe...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
...The Food and Drug Administration (FDA) is issuing this document to address labeling and effectiveness testing for certain over-the counter (OTC) sunscreen products containing specified active ingredients and marketed without approved applications. This document addresses labeling and effectiveness testing issues raised by the nearly 2,900 submissions that we received in response to the sunscreen proposed rule of August 27, 2007 (2007 proposed rule). The document also identifies specific claims that render a product that is subject to this rule misbranded or would not be allowed on any OTC sunscreen product marketed without an approved application. The document does not address issues related to sunscreen active ingredients or certain other issues regarding the GRASE determination for sunscreen products. The document requires OTC sunscreen products to comply with the content and format requirements for OTC drug labeling contained in the 1999 Drug Facts final rule (published in the Federal Register of March 17, 1999, by lifting the delay of implementation date for that rule that we published on September 3, 2004).
The purpose of this memorandum is to ensure that EPA Regions scrutinize all proposed plans, draft and final RODs, and post-ROD documents that address institutional controls (ICs) in order to verify that they adequately document the objectives of the ICs and clearly identify who has responsibility for implementation, monitoring, reporting, and enforcement of the IC.
Astaneh, Behrooz; Khani, Parisa
2017-11-10
Researchers should strictly consider the participants' rights. They are required to document such protections as an ethical approval of the study proposal, the obtaining "informed consent", the authors' "conflict of interests", and the source of "financial support" in the published articles. The purpose of this study was to assess the frequency of reporting ethical issues in human subject articles published in Iranian medical journals during 2009-2013. In this cross-sectional study, we randomly reviewed 1460 human subject articles published in Iranian medical journals during 2009-2013 in two Persian and English language groups. Data collection was carried out by assessing articles, focusing on the documentation "ethics committee approval", patients' "informed consent", "financial support", "confidentiality", and "conflict of interest". Of 1460 evaluated articles, 443 (30.3%) reported "ethics committee approval", 686 (47.0%) reported "informed consent", 594 (40.7%) reported "financial support", and 341 (23.4%) reported "conflict of interest". 13% of the articles referred to patients' confidentiality in their text. There was a significant association between these ethical documentations and the year of publication. Articles published in English language journals reported "ethics committee approval", "financial support", and "conflict of interest" significantly more than Persian language journals, but the frequency of "informed consent" was similar. Ethical documentation rate in Iranian medical journals is not up to the expected standards of reputable journals which might be related to a lack of awareness and the education of the authors and the journal's editors. Precise reporting of ethical considerations in medical articles by authors are recommended. It is suggested journals and policymakers pay more attention to reporting this issue while providing standard guidelines in this regard.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-10
...In compliance with the Paperwork Reduction Act (PRA), this document announces that EPA is planning to submit a request to renew an existing approved Information Collection Request (ICR) to the Office of Management and Budget (OMB). This ICR is scheduled to expire on November 30, 2012. Before submitting the ICR to OMB for review and approval, EPA is soliciting comments on specific aspects of the proposed information collection as described below.
The Obligations of American Citizenship: A Historical Perspective.
ERIC Educational Resources Information Center
Murphy, Paul L.
1983-01-01
Historical antecedents of modern constitutionalism are examined, and the concepts of citizen participation, civic responsibility, and limitation of government are explained in that context. Students must be exposed to the constitutional basics--why the document is retained, what values it incorporates, and where it has succeeded and failed. (PP)
We the People: Elementary Pre-Service Teachers and Constitutional Readability
ERIC Educational Resources Information Center
Meier, Lori T.; Keith, Karin J.; Dwyer, Edward J.
2014-01-01
In light of increasing mandates to incorporate close reading of primary source historical documents at the elementary level, this study explored the reading difficulty level of the US Constitution with preservice elementary teachers using a traditional cloze assessment procedure. While best practice pedagogy of social studies has long included…
ERIC Educational Resources Information Center
Baker, Thomas E.; Viator, James E.
1990-01-01
A law school course about the Constitution's history and theory in the era of its framers is described. The course explores their learning, ideas, and vision and examines the document's intellectual background, writing and ratification processes, major issues and alternatives confronted, and ideas about its function as a form of government. (MSE)
Guidance on Whether Replacing the Refractory Brick Constitutes a Major Modification
This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
36 CFR § 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2013 CFR
2013-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
19 CFR 146.8 - Seals, authority of operator to break and affix.
Code of Federal Regulations, 2012 CFR
2012-04-01
...; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES General Provisions § 146.8 Seals, authority of... intermodal container containing merchandise approved for admission to the zone upon its arrival at the zone... entry, withdrawal, or other approval document has been obtained for movement in-bond from the zone. The...
19 CFR 146.8 - Seals, authority of operator to break and affix.
Code of Federal Regulations, 2011 CFR
2011-04-01
...; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES General Provisions § 146.8 Seals, authority of... intermodal container containing merchandise approved for admission to the zone upon its arrival at the zone... entry, withdrawal, or other approval document has been obtained for movement in-bond from the zone. The...
19 CFR 146.8 - Seals, authority of operator to break and affix.
Code of Federal Regulations, 2014 CFR
2014-04-01
...; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES General Provisions § 146.8 Seals, authority of... intermodal container containing merchandise approved for admission to the zone upon its arrival at the zone... entry, withdrawal, or other approval document has been obtained for movement in-bond from the zone. The...
19 CFR 146.8 - Seals, authority of operator to break and affix.
Code of Federal Regulations, 2013 CFR
2013-04-01
...; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES General Provisions § 146.8 Seals, authority of... intermodal container containing merchandise approved for admission to the zone upon its arrival at the zone... entry, withdrawal, or other approval document has been obtained for movement in-bond from the zone. The...
19 CFR 146.8 - Seals, authority of operator to break and affix.
Code of Federal Regulations, 2010 CFR
2010-04-01
...; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES General Provisions § 146.8 Seals, authority of... intermodal container containing merchandise approved for admission to the zone upon its arrival at the zone... entry, withdrawal, or other approval document has been obtained for movement in-bond from the zone. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0131, FRL-9317-9] Approval and Promulgation of Air Quality Implementation Plans; State of California; Regional Haze State Implementation Plan and Interstate Transport Plan; Interference With Visibility Requirement Correction In rule document...
25 CFR 217.7 - Implementation of decision.
Code of Federal Regulations, 2010 CFR
2010-04-01
... expendient to implement the decisions of the joint managers, insofar as such issuance is authorized by law, and he shall execute and/or approve such documents for and on behalf of the joint managers, or either... to execute an instrument on behalf of one or both of the joint managers and to approve the same...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
....01. Finally, the document inadvertently neglected to remove 40 CFR 52.1073(h) containing the... approval of Maryland's SIP revision, EPA has determined that section 52.1073(h) is redundant and should.../11.'' All other amendments to this paragraph remain unchanged. Sec. 52.1073 [Corrected] 0 3. On page...
24 CFR 990.315 - Submission and approval of operating budgets.
Code of Federal Regulations, 2010 CFR
2010-04-01
... operating budgets. 990.315 Section 990.315 Housing and Urban Development Regulations Relating to Housing and..., Monitoring, and Reporting § 990.315 Submission and approval of operating budgets. (a) Required documentation: (1) Prior to the beginning of its fiscal year, a PHA shall prepare an operating budget in a manner...
7 CFR 1717.304 - State regulatory authority rate jurisdiction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... GUARANTEED ELECTRIC LOANS Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717... terms of the RUS wholesale power contract or other RUS documents may be subject to the approval of a state regulatory authority, the power supply borrower shall seek such required approval in a timely...
7 CFR 1717.304 - State regulatory authority rate jurisdiction.
Code of Federal Regulations, 2011 CFR
2011-01-01
... GUARANTEED ELECTRIC LOANS Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717... terms of the RUS wholesale power contract or other RUS documents may be subject to the approval of a state regulatory authority, the power supply borrower shall seek such required approval in a timely...
32 CFR 571.3 - Waiver enlistment criteria.
Code of Federal Regulations, 2010 CFR
2010-07-01
... document their waiver requests, as prescribed by AR 601-210 or AR 40-501. (3) The approval authorities for various types of waiver requests are set forth in AR 601-210. Commanders at levels below the approval... substantiate a meritorious case. (4) Unless otherwise stated in AR 601-210, waivers are valid for 6 months. (b...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-21
... DEPARTMENT OF JUSTICE Agency Information Collection Activities; Revision of a Previously Approved Collection, With Change; Comments Requested: COPS Progress Report Correction In notice document 2013-25701, appearing on page 64979 in the issue of Wednesday, October 30, 2013, make the following correction: On page 64979, in the second column,...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... Request: Extension of a currently approved collection. Originating Office: Bureau of Human Resources... information collection and supporting documents from Marvin E. Moore, Bureau of Human Resources, Recruitment... Management and Budget (OMB) for approval in accordance with the Paperwork Reduction Act of 1995. Title of...
Evaluation of Barrier Cable Impact Pad Materials
1988-03-01
INFORMATION CENTER CAMERON STATION ALEXANDRIA, VIRGINIA 22314 Unclassified SECURITY CLASSIFICATION OF THIS PAGE Form Approved REPORT DOCUMENTATION PAGE OMB...No. 0704-0188 _____________________________________________Exp. Date: Jun 30, 1986 la. REPORT SECURITY CLASSIFICATION lb. RESTRICTIVE MARKINGS...Unclassified 2a. SECURITY CLASSIFICATION AUTHORITY 3. DISTRIBUTION/AVAILABILITY OF REPORT 2b. DECLASSIFICATION/DOWNGRADING SCHEDULE Approved for public
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Communication Requirements for the Safe Transportation of Air Bag Inflators, Air Bag Modules, and Seat-Belt... Materials Regulations applicable to air bag inflators, air bag modules, and seat-belt pretensioners. The... amending the current approval and documentation requirements for a material classified as a UN3268 air bag...
Scientific Basis for Paint Stripping Mechanism for Methylene Chloride Based Paint Removers
2011-09-01
2011 Young Han, Ph.D NAVAIR Materials Engineering Division Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden...11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release, distribution unlimited 13...8-1 8.1 List of Scientific/Technical Publications
77 FR 74824 - Notice of Revision of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-18
... the Commodity Credit Corporation (CCC) to request a revision for a currently approved information collection in support of the CCC's Dairy Export Incentive Program (DEIP) based on re-estimates. Although the... applying for a CCC bonus (section 1494.501), and (4) documentation evidencing export to support payment of...
14 CFR 1230.115 - IRB records.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true IRB records. 1230.115 Section 1230.115... documentation of IRB activities, including the following: (1) Copies of all research proposals reviewed, scientific evaluations, if any, that accompany the proposals, approved sample consent documents, progress...
14 CFR 1230.115 - IRB records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false IRB records. 1230.115 Section 1230.115... documentation of IRB activities, including the following: (1) Copies of all research proposals reviewed, scientific evaluations, if any, that accompany the proposals, approved sample consent documents, progress...
22 CFR 96.40 - Fee policies and procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Accreditation and Approval Information Disclosure, Fee Practices, and Quality Control Policies and Practices... parent(s), the agency or person itemizes and discloses in writing the following information for each... documents and for any translation of documents related to the adoption, along with information on whether...
22 CFR 96.40 - Fee policies and procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Accreditation and Approval Information Disclosure, Fee Practices, and Quality Control Policies and Practices... parent(s), the agency or person itemizes and discloses in writing the following information for each... documents and for any translation of documents related to the adoption, along with information on whether...
22 CFR 96.40 - Fee policies and procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Accreditation and Approval Information Disclosure, Fee Practices, and Quality Control Policies and Practices... parent(s), the agency or person itemizes and discloses in writing the following information for each... documents and for any translation of documents related to the adoption, along with information on whether...
List of draft permit & supporting documentation for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).
10 CFR 2.1303 - Availability of documents.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1303 Availability of documents. Unless exempt... for a license transfer requiring Commission approval will be placed at the NRC Web site, http://www...
10 CFR 2.1303 - Availability of documents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1303 Availability of documents. Unless exempt... for a license transfer requiring Commission approval will be placed at the NRC Web site, http://www...
21 CFR 814.104 - Original applications.
Code of Federal Regulations, 2014 CFR
2014-04-01
... the Center for Biologics Evaluation and Research, send this information to the Document Control Center... and Research, send this information to the Central Document Control Room, Center for Drug Evaluation... device under an approved IDE) is available to treat or diagnose the disease or condition. The application...
1997-07-07
On April 8, 1997, the Department of Labor published interim final rules governing disclosure requirements for private sector group health plans (62 FR 16979). The rules implemented changes to made to certain provisions of the Employee Retirement Income Security Act of 1974 (ERISA), enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). In the April 8 publication, the Department submitted its revision of the currently approved collection regarding Summary Plan Description requirements under ERISA to the Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1965 (PRA 95). This document amends the April 8 Federal Register document to properly display the OMB control number, 1210-0039.
24 CFR 585.403 - Reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Performance Evaluation Report noted in paragraph (b) of this section will constitute the final Quarterly Report. (b) Performance Evaluation Report. Each recipient of a Youthbuild grant must submit a Performance... substance of the Performance Evaluation Report shall be provided to recipients. (Approved by the Office of...
Code of Federal Regulations, 2011 CFR
2011-04-01
... defined in § 20.81. (2) Any protocol for a test or study unless the protocol is shown to constitute trade... available for public disclosure. (3) Quantitative or semiquantitative formulas. [51 FR 26364, July 22, 1986...
40 CFR 1042.910 - Reference materials.
Code of Federal Regulations, 2012 CFR
2012-07-01
... incorporated by reference into this part. The Director of the Federal Register approved the incorporation by... and Radiation Docket and Information Center, 1301 Constitution Ave., NW., Room B102, EPA West Building.../federal_register/code_of_federal_regulations/ibr_locations.html. (a) IMO material. This paragraph (a...
40 CFR 1043.100 - Reference materials.
Code of Federal Regulations, 2012 CFR
2012-07-01
... this part. The Director of the Federal Register approved the incorporation by reference as prescribed... Docket and Information Center, 1301 Constitution Ave., NW., Room B102, EPA West Building, Washington, DC.../federal_register/code_of_federal_regulations/ibr_locations.html. (a) IMO material. This paragraph (a...
40 CFR 1043.100 - Reference materials.
Code of Federal Regulations, 2011 CFR
2011-07-01
... this part. The Director of the Federal Register approved the incorporation by reference as prescribed... Docket and Information Center, 1301 Constitution Ave., NW., Room B102, EPA West Building, Washington, DC.../federal_register/code_of_federal_regulations/ibr_locations.html. (a) IMO material. This paragraph (a...
40 CFR 1042.910 - Reference materials.
Code of Federal Regulations, 2011 CFR
2011-07-01
... incorporated by reference into this part. The Director of the Federal Register approved the incorporation by... and Radiation Docket and Information Center, 1301 Constitution Ave., NW., Room B102, EPA West Building.../federal_register/code_of_federal_regulations/ibr_locations.html. (a) IMO material. This paragraph (a...
36 CFR 59.3 - Conversion requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... not been dedicated or managed for recreation/conservation use may be used as replacement land even if... proposed conversion and substitution constitute significant changes to the original Land and Water... approval is not necessarily required, however, for each and every facility use change. Rather, a project...
ERIC Educational Resources Information Center
Hutchens, Dorothy
This lesson plan for elementary-age children studies some of the primary source documents and symbols of freedom which were and are important for the nation. The lesson plan uses the following documents: "The Mayflower Compact"; "The Declaration of Independence"; "The Constitution"; and the "Bill of Rights."…
From Oral Ceremony to Written Document: The Transitional Language of Anglo-Saxon Wills.
ERIC Educational Resources Information Center
Danet, Brenda; Bogoch, Bryna
1992-01-01
Presents theoretical discussion of the emergence of linguistic features of documents that indicate society is moving toward a view of writing as a form of constitutive social action and of written documents as autonomous material objects having a life of their own. Linguistic features of Anglo-Saxon wills are shown to differ from those of modern…
1998-04-01
INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 8 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland fr r=.~r i^:r^f>^’ m% Approved for public...Document 4. TITLE AND SUBTITLE No Further Action Decision Document for Site 8 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 7. PERFORMING
2006-11-01
Hampton, VA 23666 November 2006 Approved for public release: distribution is unlimited. 20070907323 ABERDEEN PROVING GROUND, MD 21010-5424 DISCLAIMER...REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour...SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION I AVAILABILITY STATEMENT Approved for public release; distribution is unlimited. 13. SUPPLEMENTARY
Code of Federal Regulations, 2010 CFR
2010-10-01
... endorsement revoked pursuant to Appendix D of Public Law 106-554, 114 Stat 2763. Subject to this exclusion... Documented Vessels or vessels the last documentation of which was under the laws of the United States and... vessels the last documentation of which was under the laws of the United States and which are of 1,000...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-29
... Aviation Regulation. The pilot training requires a logbook endorsement and documentation of a training...) that established a standardized pilot training program. The collection of information is necessary to document participation, completion, and compliance with the pilot training program. Respondents...
40 CFR 141.25 - Analytical methods for radioactivity.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Monitoring and Analytical Requirements... obtaining these documents can be obtained from the Safe Drinking Water Hotline at 800-426-4791. Documents may be inspected at EPA's Drinking Water Docket, EPA West, 1301 Constitution Avenue, NW., Room 3334...
40 CFR 141.25 - Analytical methods for radioactivity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Monitoring and Analytical Requirements... obtaining these documents can be obtained from the Safe Drinking Water Hotline at 800-426-4791. Documents may be inspected at EPA's Drinking Water Docket, EPA West, 1301 Constitution Avenue, NW., Room 3334...
40 CFR 141.25 - Analytical methods for radioactivity.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Monitoring and Analytical Requirements... obtaining these documents can be obtained from the Safe Drinking Water Hotline at 800-426-4791. Documents may be inspected at EPA's Drinking Water Docket, EPA West, 1301 Constitution Avenue, NW., Room 3334...
40 CFR 141.25 - Analytical methods for radioactivity.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Monitoring and Analytical Requirements... obtaining these documents can be obtained from the Safe Drinking Water Hotline at 800-426-4791. Documents may be inspected at EPA's Drinking Water Docket, EPA West, 1301 Constitution Avenue, NW., Room 3334...
3 CFR - Presidential Signing Statements
Code of Federal Regulations, 2010 CFR
2010-01-01
... 3 The President 1 2010-01-01 2010-01-01 false Presidential Signing Statements Presidential Documents Other Presidential Documents Memorandum of March 9, 2009 Presidential Signing Statements Memorandum for the Heads of Executive Departments and Agencies For nearly two centuries, Presidents have issued statements addressing constitutional or other...
Biblical Antecedents to Fiscal Equity: Policy Implications for Education.
ERIC Educational Resources Information Center
Furst, Lyndon G.
Most arguments for fiscal equity in financing America's schools have been based on constitutional provisions and on the socio-political dogma that underlies a democratic society. This paper approaches the subject using as its theoretical basis a document even more basic to the founding of the republic than the Constitution--the Bible. Using the…
The Purpose, Structure and Limitations of the Electoral College
ERIC Educational Resources Information Center
Webster, Gerald R.
2016-01-01
The U.S. Constitution was drafted in Philadelphia from late May to mid-September 1787. The fifty-five delegates to the Constitutional Convention gathered to revise the Articles of Confederation but soon decided to write an entirely new document. These "Framers" were committed to forming a representative democracy, but their largely…