Sample records for document control plan

  1. Airport Surface Traffic Control Visual Ground Aids Engineering and Development Plan

    DOT National Transportation Integrated Search

    1977-01-01

    The plan described in this document supports the overall program at the Transportation Systems Center to define, design, develop, and evaluate systems that meet the requirements of airport surface traffic control. This plan is part of documentation s...

  2. Guidance and Control Software Project Data - Volume 1: Planning Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  3. U.S. Coast Guard Telecommunications Plan (TCP) - Development Document

    DOT National Transportation Integrated Search

    1997-04-28

    The Coast Guard Telecommunications Plan (TCP) describes the near to mid-term telecommunications goals and objectives for Command, Control, and Communications (C3) support. It is intended to document internal telecommunications planning and to provide...

  4. 75 FR 14361 - Notification, Documentation, and Recordkeeping Requirements for Inspected Establishments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... establishment's process control plans, that is, its Hazard Analysis and Critical Control Point plans. DATES... control plans, i.e., its Hazard Analysis and Critical Control Point (HACCP) plans; and (3) make the recall... systematic prevention of biological, chemical, and physical hazards. HACCP plans are establishment-developed...

  5. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  6. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  7. Odor Control Test Report of the Urine Containment Bag (UCB) for Orion Utilization

    NASA Technical Reports Server (NTRS)

    Casper, Stephanie; Williams, Nichole M. M.

    2010-01-01

    The purpose of this report is to summarize the conclusions for the odor control test of the Urine Containment Bag (UCB), P/N SDD46107234-306 in an environment simulating a space craft capsule. JSC 65891, Odor Control Test Plan of the Urine Containment Bag (UCB) for Orion Utilization, documents the test plan. The details of the test set-up and data reduction are detailed in the WSTF test report for this test WSTF #10-44500, Odor Control Test Plan of the Urine Containment Bag (UCB) for Orion Utilization,. This document outlines the project conclusions and forward plans with regard to trash containment for Constellation.

  8. Quality-assurance plan for the analysis of suspended sediment by the U.S. Geological Survey in Montana

    USGS Publications Warehouse

    Dodge, Kent A.; Lambing, John H.

    2006-01-01

    A quality-assurance plan has been developed for use by the sediment laboratory of the U.S. Geological Survey Montana Water Science Center in conducting activities related to the analysis of suspended sediment. The plan documents quality-assurance policies for sediment-laboratory certification, personnel responsibilities and training, documentation requirements, and laboratory safety. The plan also documents quality-assurance procedures related to laboratory equipment and supplies, sample management, sample analysis, analytical quality control, and data management.

  9. Altria means tobacco: Philip Morris's identity crisis.

    PubMed

    Smith, Elizabeth A; Malone, Ruth E

    2003-04-01

    Philip Morris Companies, the world's largest and most profitable tobacco seller, has changed its corporate name to The Altria Group. The company has also embarked on a plan to improve its corporate image. Examination of internal company documents reveals that these changes have been planned for over a decade and that the company expects to reap specific and substantial rewards from them. Tobacco control advocates should be alert to the threat Philip Morris's plans pose to industry focused tobacco control campaigns. Company documents also suggest what the vulnerabilities of those plans are and how advocates might best exploit them.

  10. Altria Means Tobacco: Philip Morris’s Identity Crisis

    PubMed Central

    Smith, Elizabeth A.; Malone, Ruth E.

    2003-01-01

    Philip Morris Companies, the world’s largest and most profitable tobacco seller, has changed its corporate name to The Altria Group. The company has also embarked on a plan to improve its corporate image. Examination of internal company documents reveals that these changes have been planned for over a decade and that the company expects to reap specific and substantial rewards from them. Tobacco control advocates should be alert to the threat Philip Morris’s plans pose to industryfocused tobacco control campaigns. Company documents also suggest what the vulnerabilities of those plans are and how advocates might best exploit them. PMID:12660196

  11. EPA Concurrence/Approval of Federal Facility Proposed Plans and Records of Decision and other Documents

    EPA Pesticide Factsheets

    The purpose of this memorandum is to ensure that EPA Regions scrutinize all proposed plans, draft and final RODs, and post-ROD documents that address institutional controls (ICs) in order to verify that they adequately document the objectives of the ICs and clearly identify who has responsibility for implementation, monitoring, reporting, and enforcement of the IC.

  12. Bangladesh policy on prevention and control of non-communicable diseases: a policy analysis.

    PubMed

    Biswas, Tuhin; Pervin, Sonia; Tanim, Md Imtiaz Alam; Niessen, Louis; Islam, Anwar

    2017-06-19

    This paper is aimed at critically assessing the extent to which Non-Communicable Disease NCD-related policies introduced in Bangladesh align with the World Health Organization's (WHO) 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. The authors reviewed all relevant policy documents introduced by the Government of Bangladesh since its independence in 1971. The literature review targeted scientific and grey literature documents involving internet-based search, and expert consultation and snowballing to identify relevant policy documents. Information was extracted from the documents using a specific matrix, mapping each document against the six objectives of the WHO 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. A total of 51 documents were identified. Seven (14%) were research and/or surveys, nine were on established policies (17%), while seventeen (33%) were on action programmes. Five (10%) were related to guidelines and thirteen (25%) were strategic planning documents from government and non-government agencies/institutes. The study covered documents produced by the Government of Bangladesh as well as those by quasi-government and non-government organizations irrespective of the extent to which the intended policies were implemented. The policy analysis findings suggest that although the government has initiated many NCD-related policies or programs, they lacked proper planning, implementation and monitoring. Consequently, Bangladesh over the years had little success in effectively addressing the growing burden of non-communicable diseases. It is imperative that future research critically assess the effectiveness of national NCD policies by monitoring their implementation and level of population coverage.

  13. Institutional Controls: A Guide to Preparing Institutional Control Implementation and Assurance Plans at Contaminated Sites

    EPA Pesticide Factsheets

    The purpose of this document is to provide guidance to the EPA Regions for developing Institutional Control Implementation and Assurance Plans (ICIAPs) at contaminated sites where the response action includes an institutional controls (ICs) component.

  14. Noncommunicable Disease Prevention and Control in Mongolia: A Policy Analysis.

    PubMed

    Chimeddamba, Oyun; Peeters, Anna; Walls, Helen L; Joyce, Catherine

    2015-07-14

    Noncommunicable diseases (NCDs) are the major global cause of morbidity and mortality. In Mongolia, a number of health policies have been developed targeting the prevention and control of noncommunicable diseases. This paper aimed to evaluate the extent to which NCD-related policies introduced in Mongolia align with the World Health Organization (WHO) 2008-2013 Action Plan for the Global Strategy for the Prevention and Control of NCDs. We conducted a review of policy documents introduced by the Government of Mongolia from 2000 to 2013. A literature review, internet-based search, and expert consultation identified the policy documents. Information was extracted from the documents using a matrix, mapping each document against the six objectives of the WHO 2008-2013 Action Plan for the Global Strategy for the Prevention and Control of NCDs and five dimensions: data source, aim and objectives of document, coverage of conditions, coverage of risk factors and implementation plan. 45 NCD-related policies were identified. Prevention and control of the common NCDs and their major risk factors as described by WHO were widely addressed, and policies aligned well with the objectives of the WHO 2008-2013 Action Plan for the Global Strategy for the Prevention and Control of NCDs. Many documents included explicit implementation or monitoring frameworks. It appears that each objective of the WHO 2008-2013 NCD Action Plan was well addressed. Specific areas less well and/or not addressed were chronic respiratory disease, physical activity guidelines and dietary standards. The Mongolian Government response to the emerging burden of NCDs is a population-based public health approach that includes a national multisectoral framework and integration of NCD prevention and control policies into national health policies. Our findings suggest gaps in addressing chronic respiratory disease, physical activity guidelines, specific food policy actions restricting sales advertising of food products, and a lack of funding specifically supporting NCD research. The neglect of these areas may hamper addressing the NCD burden, and needs immediate action. Future research should explore the effectiveness of national NCD policies and the extent to which the policies are implemented in practice.

  15. 75 FR 32858 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... Boilers and Process Heaters at Petroleum Refineries Correction In rule document 2010-13377 beginning on... limitations for Control [Insert page number any industrial boiler or Requirements. where the document process...

  16. 40 CFR 230.94 - Planning and documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and...

  17. 40 CFR 230.94 - Planning and documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and...

  18. 40 CFR 230.94 - Planning and documentation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and...

  19. 40 CFR 230.94 - Planning and documentation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and...

  20. 42 CFR 456.242 - UR plan requirements for medical care evaluation studies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Mental Hospitals Ur Plan: Medical Care Evaluation Studies § 456.242 UR plan requirements for medical care... evaluation studies in the mental hospital; (2) Documents for each study— (i) Its results; and (ii) How the...

  1. Earth Observing System/Meteorological Satellite (EOS/METSAT). Advanced Microwave Sounding Unit-A (AMSU-A) Contamination Control Plan

    NASA Technical Reports Server (NTRS)

    Fay, M.

    1998-01-01

    This Contamination Control Plan is submitted in response the Contract Document requirements List (CDRL) 007 under contract NAS5-32314 for the Earth Observing System (EOS) Advanced Microwave Sounding Unit A (AMSU-A). In response to the CDRL instructions, this document defines the level of cleanliness and methods/procedures to be followed to achieve adequate cleanliness/contamination control, and defines the required approach to maintain cleanliness/contamination control through shipping, observatory integration, test, and flight. This plan is also applicable to the Meteorological Satellite (METSAT) except where requirements are identified as EOS-specific. This plan is based on two key factors: a. The EOS/METSAT AMSU-A Instruments are not highly contamination sensitive. b. Potential contamination of other EOS Instruments is a key concern as addressed in Section 9/0 of the Performance Assurance Requirements for EOS/METSAT Integrated Programs AMSU-A Instrument (MR) (NASA Specification S-480-79).

  2. 29 CFR 2520.102-3 - Contents of summary plan description.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... document that accompanies the plan's SPD, provided that the document satisfies the style and format... descriptive provisions in addition to those prescribed in paragraph (t)(2) of this section. However, the style... Office of Management and Budget under control number 1210-0039) [42 FR 37180, July 19, 1977, as amended...

  3. Electron/proton spectrometer certification documentation analyses

    NASA Technical Reports Server (NTRS)

    Gleeson, P.

    1972-01-01

    A compilation of analyses generated during the development of the electron-proton spectrometer for the Skylab program is presented. The data documents the analyses required by the electron-proton spectrometer verification plan. The verification plan was generated to satisfy the ancillary hardware requirements of the Apollo Applications program. The certification of the spectrometer requires that various tests, inspections, and analyses be documented, approved, and accepted by reliability and quality control personnel of the spectrometer development program.

  4. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  5. 222-S Laboratory Quality Assurance Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meznarich, H.K.

    1995-07-31

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A qualitymore » assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.« less

  6. 76 FR 74014 - Approval and Promulgation of Implementation Plans; Illinois; Volatile Organic Compound Emission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-30

    ... Promulgation of Implementation Plans; Illinois; Volatile Organic Compound Emission Control Measures for Chicago... Act's (the Act) requirement that States revise their SIPs to include reasonably available control... rules are approvable because they are consistent with the Control Technique Guideline (CTG) documents...

  7. 77 FR 66429 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... 1994. 11. ``Integrated Pollution Prevention and Control (IPPC) Reference Document on Best Available...

  8. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  9. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  10. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  11. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  12. Differences in reporting of analyses in internal company documents versus published trial reports: comparisons in industry-sponsored trials in off-label uses of gabapentin.

    PubMed

    Vedula, S Swaroop; Li, Tianjing; Dickersin, Kay

    2013-01-01

    Details about the type of analysis (e.g., intent to treat [ITT]) and definitions (i.e., criteria for including participants in the analysis) are necessary for interpreting a clinical trial's findings. Our objective was to compare the description of types of analyses and criteria for including participants in the publication (i.e., what was reported) with descriptions in the corresponding internal company documents (i.e., what was planned and what was done). Trials were for off-label uses of gabapentin sponsored by Pfizer and Parke-Davis, and documents were obtained through litigation. For each trial, we compared internal company documents (protocols, statistical analysis plans, and research reports, all unpublished), with publications. One author extracted data and another verified, with a third person verifying discordant items and a sample of the rest. Extracted data included the number of participants randomized and analyzed for efficacy, and types of analyses for efficacy and safety and their definitions (i.e., criteria for including participants in each type of analysis). We identified 21 trials, 11 of which were published randomized controlled trials, and that provided the documents needed for planned comparisons. For three trials, there was disagreement on the number of randomized participants between the research report and publication. Seven types of efficacy analyses were described in the protocols, statistical analysis plans, and publications, including ITT and six others. The protocol or publication described ITT using six different definitions, resulting in frequent disagreements between the two documents (i.e., different numbers of participants were included in the analyses). Descriptions of analyses conducted did not agree between internal company documents and what was publicly reported. Internal company documents provide extensive documentation of methods planned and used, and trial findings, and should be publicly accessible. Reporting standards for randomized controlled trials should recommend transparent descriptions and definitions of analyses performed and which study participants are excluded.

  13. Consolidated Cab Display (CCD) System, Project Planning Document (PPD),

    DTIC Science & Technology

    1981-02-01

    1980 1981 I 2 3 4 5 6 7 8 9 10 1112 1 2 3 4 5 6 7 8 9 1011112 1 2 31 12. Software Documentation a. Overall Computer Program Description ( OCPD ) b...Approve OCPD c. Computer Program Functional Specifications (CPFS) d. Data Base Table Design Specification (DBTDS) e. Software Interface Control Document...Parts List Master Pattern and Plan View Reproducible Drawings Instruction Book Training Aids/Materials b. Software: OCPD CPFS SI CD PDS DBTDS SDD

  14. Knowledge enabled plan of care and documentation prototype.

    PubMed

    DaDamio, Rebecca; Gugerty, Brian; Kennedy, Rosemary

    2006-01-01

    There exist significant challenges in integrating the plan of care into documentation and point of care operational processes. A plan of care is often a static artifact that meets regulatory standards with limited influence on supporting goal-directed care delivery processes. Although this prototype is applicable to many clinical disciplines, we will highlight nursing processes in demonstrating a knowledge-driven computerized solution that fully integrates the plan of care within documentation. The knowledge-driven solution reflects evidenced-based practice; is an effective tool for managing problems, orders/interventions, and the patient's progress towards expected outcomes; meets regulatory standards; and drives quality and process improvement. The knowledge infrastructure consists of fully represented terminology, structured clinical expressions utilizing the controlled terminology and clinical knowledge representing evidence-based practice.

  15. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  16. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  17. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  18. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laney, T.

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less

  19. PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  20. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROOT, R.W.

    1999-05-18

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.

  1. 78 FR 72903 - Collection of Information Under Review by Office of Management and Budget

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... will address them accordingly. Viewing Comments and Documents To view comments, as well as documents.... This information is required to control vessel traffic, develop contingency plans and enforce...

  2. PRE-QAPP AGREEMENT (PQA) AND ANALYTICAL METHOD CHECKLISTS (AMCS): TOOLS FOR PLANNING RESEARCH PROJECTS

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  3. Differences in Reporting of Analyses in Internal Company Documents Versus Published Trial Reports: Comparisons in Industry-Sponsored Trials in Off-Label Uses of Gabapentin

    PubMed Central

    Vedula, S. Swaroop; Li, Tianjing; Dickersin, Kay

    2013-01-01

    Background Details about the type of analysis (e.g., intent to treat [ITT]) and definitions (i.e., criteria for including participants in the analysis) are necessary for interpreting a clinical trial's findings. Our objective was to compare the description of types of analyses and criteria for including participants in the publication (i.e., what was reported) with descriptions in the corresponding internal company documents (i.e., what was planned and what was done). Trials were for off-label uses of gabapentin sponsored by Pfizer and Parke-Davis, and documents were obtained through litigation. Methods and Findings For each trial, we compared internal company documents (protocols, statistical analysis plans, and research reports, all unpublished), with publications. One author extracted data and another verified, with a third person verifying discordant items and a sample of the rest. Extracted data included the number of participants randomized and analyzed for efficacy, and types of analyses for efficacy and safety and their definitions (i.e., criteria for including participants in each type of analysis). We identified 21 trials, 11 of which were published randomized controlled trials, and that provided the documents needed for planned comparisons. For three trials, there was disagreement on the number of randomized participants between the research report and publication. Seven types of efficacy analyses were described in the protocols, statistical analysis plans, and publications, including ITT and six others. The protocol or publication described ITT using six different definitions, resulting in frequent disagreements between the two documents (i.e., different numbers of participants were included in the analyses). Conclusions Descriptions of analyses conducted did not agree between internal company documents and what was publicly reported. Internal company documents provide extensive documentation of methods planned and used, and trial findings, and should be publicly accessible. Reporting standards for randomized controlled trials should recommend transparent descriptions and definitions of analyses performed and which study participants are excluded. Please see later in the article for the Editors' Summary PMID:23382656

  4. 76 FR 26615 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2007-1073; FRL-9292-4] Revisions to the California State Implementation Plan, Imperial County Air Pollution Control District (ICAPCD... has established docket number EPA-R09-OAR-2007-1073 for this action. Generally, documents in the...

  5. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  6. 14 CFR 77.75 - Establishment of antenna farm areas.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... indicated on an FAA planning document or military service military airport planning document. Planned or...; any other FAA planning document, or military service military airport planning document. Public use... layout plan, a military service approved military airport layout plan, or by any planning document...

  7. Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

    NASA Technical Reports Server (NTRS)

    Niewoehner, Kevin R.; Carter, John (Technical Monitor)

    2001-01-01

    The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

  8. Facilitating NASA's Use of GEIA-STD-0005-1, Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-Free Solder

    NASA Technical Reports Server (NTRS)

    Plante, Jeannete

    2010-01-01

    GEIA-STD-0005-1 defines the objectives of, and requirements for, documenting processes that assure customers and regulatory agencies that AHP electronic systems containing lead-free solder, piece parts, and boards will satisfy the applicable requirements for performance, reliability, airworthiness, safety, and certify-ability throughout the specified life of performance. It communicates requirements for a Lead-Free Control Plan (LFCP) to assist suppliers in the development of their own Plans. The Plan documents the Plan Owner's (supplier's) processes, that assure their customer, and all other stakeholders that the Plan owner's products will continue to meet their requirements. The presentation reviews quality assurance requirements traceability and LFCP template instructions.

  9. USER'S GUIDE: EMISSION CONTROL TECHNOLOGIES AND EMISSION FACTORS FOR UNPAVED ROAD FUGITIVE EMISSIONS

    EPA Science Inventory

    This document assists control agency personnel in evaluating unpaved road fugitive emissions control plans and helps industry personnel develop effective control strategies for unpaved roads. he brochure describes control techniques for reducing unpaved road emissions and methods...

  10. Human Systems Integration: Unmanned Aircraft Control Station Certification Plan Guidance

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This document provides guidance to the FAA on important human factors considerations that can be used to support the certification of a UAS Aircraft Control Station (ACS). This document provides a synopsis of the human factors analysis, design and test activities to be performed to provide a basis for FAA certification. The data from these analyses, design activities, and tests, along with data from certification/qualification tests of other key components should be used to establish the ACS certification basis. It is expected that this information will be useful to manufacturers in developing the ACS Certification Plan,, and in supporting the design of their ACS.

  11. Policy environment for prevention, control and management of cardiovascular diseases in primary health care in Kenya.

    PubMed

    Asiki, Gershim; Shao, Shuai; Wainana, Carol; Khayeka-Wandabwa, Christopher; Haregu, Tilahun N; Juma, Pamela A; Mohammed, Shukri; Wambui, David; Gong, Enying; Yan, Lijing L; Kyobutungi, Catherine

    2018-05-09

    In Kenya, cardiovascular diseases (CVDs) accounted for more than 10% of total deaths and 4% of total Disability-Adjusted Life Years (DALYs) in 2015 with a steady increase over the past decade. The main objective of this paper was to review the existing policies and their content in relation to prevention, control and management of CVDs at primary health care (PHC) level in Kenya. A targeted document search in Google engine using keywords "Kenya national policy on cardiovascular diseases" and "Kenya national policy on non-communicable diseases (NCDs)" was conducted in addition to key informant interviews with Kenyan policy makers. Relevant regional and international policy documents were also included. The contents of documents identified were reviewed to assess how well they aligned with global health policies on CVD prevention, control and management. Thematic content analysis of the key informant interviews was also conducted to supplement the document reviews. A total of 17 documents were reviewed and three key informants interviewed. Besides the Tobacco Control Act (2007), all policy documents for CVD prevention, control and management were developed after 2013. The national policies were preceded by global initiatives and guidelines and were similar in content with the global policies. The Kenya health policy (2014-2030), The Kenya Health Sector Strategic and Investment Plan (2014-2018) and the Kenya National Strategy for the Prevention and Control of Non-communicable diseases (2015-2020) had strategies on NCDs including CVDs. Other policy documents for behavioral risk factors (The Tobacco Control Act 2007, Alcoholic Drinks Control (Licensing) Regulations (2010)) were available. The National Nutrition Action Plan (2012-2017) was available as a draft. Although Kenya has a tiered health care system comprising primary healthcare, integration of CVD prevention and control at PHC level was not explicitly mentioned in the policy documents. This review revealed important gaps in the policy environment for prevention, control and management of CVDs in PHC settings in Kenya. There is need to continuously engage the ministry of health and other sectors to prioritize inclusion of CVD services in PHC.

  12. The Air Traffic Control Environment in 2010

    DOT National Transportation Integrated Search

    1989-10-01

    This document has been prepared to assist the Airspace Control Planning Panel by describing the broad outline and general features of the environment for air traffic control functions anticipated in the 2010 timeframe. The description is based on est...

  13. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    NASA Technical Reports Server (NTRS)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  14. Bioresearch module design definition and space shuttle vehicle integration. Volume 3: Management and funding plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A description is given of the proposed project organization, documentation and reports, project planning, direction and control, related experience and facilities, and cost estimate data and options for the implementation of the bioresearch module development program.

  15. ANALYTICAL METHOD CHECKLIST FOR VOLATILE ORGANIC COMPOUNDS BY GC/MS (HANDOUT)

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  16. Too much talk and not enough action over obesity plan.

    PubMed

    2016-09-12

    After all the build-up and delays, it was probably no surprise that the government's eagerly-awaited childhood obesity plan has been derided for being too timid. The 13-page document - relatively light considering the severity of the posed threat - fails to mention tighter controls on advertising unhealthy food and drinks to children and families. Without these controls it is hard to see how the plan's stated aim of reducing childhood obesity in England over the next ten years can be met.

  17. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  18. Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A): Instrumentation interface control document

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This Interface Control Document (ICD) defines the specific details of the complete accomodation information between the Earth Observing System (EOS) PM Spacecraft and the Advanced Microwave Sounding Unit (AMSU-A)Instrument. This is the first submittal of the ICN: it will be updated periodically throughout the life of the program. The next update is planned prior to Critical Design Review (CDR).

  19. 7 CFR 1781.4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... improvement. (d) RC&D measure plan. A plan document for a land area, directly controlled or under the... area. (f) Watershed works of improvement. Structural, nonstructural, and land treatment measures... costs of installing WS works of improvement or RCD measures by the Federal Government and by sponsoring...

  20. 7 CFR 1781.4 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... improvement. (d) RC&D measure plan. A plan document for a land area, directly controlled or under the... area. (f) Watershed works of improvement. Structural, nonstructural, and land treatment measures... costs of installing WS works of improvement or RCD measures by the Federal Government and by sponsoring...

  1. Planning And Reasoning For A Telerobot

    NASA Technical Reports Server (NTRS)

    Peters, Stephen F.; Mittman, David S.; Collins, Carol E.; O'Meara Callahan, Jacquelyn S.; Rokey, Mark J.

    1992-01-01

    Document discusses research and development of Telerobot Interactive Planning System (TIPS). Goal in development of TIPS is to enable it to accept instructions from operator, then command run-time controller to execute operations to execute instructions. Challenges in transferring technology from testbed to operational system discussed.

  2. 10 CFR 1044.09 - What do you do if you plan to disclose classified or unclassified controlled nuclear information...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false What do you do if you plan to disclose classified or unclassified controlled nuclear information orally rather than by providing copies of documents? 1044.09 Section 1044.09 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) SECURITY REQUIREMENTS FOR PROTECTED DISCLOSURES UNDER SECTION 3164 OF THE NATIONAL...

  3. 10 CFR 1044.09 - What do you do if you plan to disclose classified or unclassified controlled nuclear information...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false What do you do if you plan to disclose classified or unclassified controlled nuclear information orally rather than by providing copies of documents? 1044.09 Section 1044.09 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) SECURITY REQUIREMENTS FOR PROTECTED DISCLOSURES UNDER SECTION 3164 OF THE NATIONAL...

  4. 10 CFR 1044.09 - What do you do if you plan to disclose classified or unclassified controlled nuclear information...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What do you do if you plan to disclose classified or unclassified controlled nuclear information orally rather than by providing copies of documents? 1044.09 Section 1044.09 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) SECURITY REQUIREMENTS FOR PROTECTED DISCLOSURES UNDER SECTION 3164 OF THE NATIONAL...

  5. 10 CFR 1044.09 - What do you do if you plan to disclose classified or unclassified controlled nuclear information...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false What do you do if you plan to disclose classified or unclassified controlled nuclear information orally rather than by providing copies of documents? 1044.09 Section 1044.09 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) SECURITY REQUIREMENTS FOR PROTECTED DISCLOSURES UNDER SECTION 3164 OF THE NATIONAL...

  6. 10 CFR 1044.09 - What do you do if you plan to disclose classified or unclassified controlled nuclear information...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false What do you do if you plan to disclose classified or unclassified controlled nuclear information orally rather than by providing copies of documents? 1044.09 Section 1044.09 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) SECURITY REQUIREMENTS FOR PROTECTED DISCLOSURES UNDER SECTION 3164 OF THE NATIONAL...

  7. Data Supporting Creation of Office of Communications Management.

    ERIC Educational Resources Information Center

    Turner, Alan

    Designed to support the formation of a New York State Office of Communications Management, this document contains official recommendations, cost justifications, public hearing testimonies, and government documents which address the need for a statewide control of telecommunications. A year-long, 12-step plan for implementation of a State Office of…

  8. Controller evaluation of initial data link en route air traffic control services : mini study 3

    DOT National Transportation Integrated Search

    1991-06-01

    This report documents a Federal Aviation Administration controller evaluation of air traffic control (ATC) Data Link services planned for implementation in the en route ATC system. The main body of the report includes a detailed description of the ob...

  9. SUPERFUND TREATABILITY CLEARINGHOUSE: SOIL STABILIZATION PILOT STUDY, UNITED CHROME NPL SITE PILOT STUDY AND HEALTH AND SAFETY PROGRAM, UNITED CHROME NPL SITE PILOT STUDY

    EPA Science Inventory

    This document is a project plan for a pilot study at the United Chrome NPL site, Corvallis, Oregon and includes the health and safety and quality assurance/quality control plans. The plan reports results of a bench-scale study of the treatment process as iieasured by the ...

  10. Quality Assurance Project Plan - Modeling the Impact of Hydraulic Fracturing on Water Resources Based on Water Acquisition Scenarios

    EPA Pesticide Factsheets

    This planning document describes the quality assurance/quality control activities and technical requirements that will be used during the research study. The goal of this project is to evaluate the potential impacts of large volume water withdrawals.

  11. A Guidance Document on Airport Noise Control.

    DTIC Science & Technology

    1980-08-01

    airport . This Document is one of the tools designed to help airport operators and planners reach that goal. It should aid the reader in applying the...into the five major areas where airport noise control can be applied : airport plans, airport / airspace use, aircraft operation, land use, and noise...flights to another airport is just another form of rescheduling, though it need not apply only to night operations. The FAA is concerned about the

  12. Planning and Time Management: Keys to Effective Educational Leadership.

    ERIC Educational Resources Information Center

    Sergiovanni, Thomas J.

    1980-01-01

    Educational administrators' concern with planning and time management results from the fragmentation of their daily activities, which research has documented, and their consequent search for order and control. Time is important because its scarcity affects productivity and its use has social-psychological effects on staffs' perceptions of…

  13. 14 CFR 77.2 - Definition of terms.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... planning document or military service military airport planning document. Precision instrument runway means... military airport layout plan; any other FAA planning document, or military service military airport planning document. Utility runway means a runway that is constructed for and intended to be used by...

  14. Sample Federal Facility Land Use Control ROD Checklist and Suggested Language (LUC Checklist)

    EPA Pesticide Factsheets

    The LUC Checklist provides direction on describing and documenting land use controls (LUCs) in federal facility actrions under CERCLA in Records of Decision (RODs), remedial designs (RDs), and remedial action work plans (RAWPs).

  15. VERIFICATION TESTING OF AIR POLLUTION CONTROL TECHNOLOGY QUALITY MANAGEMENT PLAN

    EPA Science Inventory

    This document is the basis for quality assurance for the Air Pollution Control Technology Verification Center (APCT Center) operated under the U.S. Environmental Protection Agency (EPA). It describes the policies, organizational structure, responsibilities, procedures, and qualit...

  16. Orbiter data reduction complex data processing requirements for the OFT mission evaluation team (level C)

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This document addresses requirements for post-test data reduction in support of the Orbital Flight Tests (OFT) mission evaluation team, specifically those which are planned to be implemented in the ODRC (Orbiter Data Reduction Complex). Only those requirements which have been previously baselined by the Data Systems and Analysis Directorate configuration control board are included. This document serves as the control document between Institutional Data Systems Division and the Integration Division for OFT mission evaluation data processing requirements, and shall be the basis for detailed design of ODRC data processing systems.

  17. Red Plague Control Plan (RPCP)

    NASA Technical Reports Server (NTRS)

    Cooke, Robert W.

    2010-01-01

    SCOPE: Prescribes the minimum requirements for the control of cuprous / cupric oxide corrosion (a.k.a. Red Plague) of silver-coated copper wire, cable, and harness assemblies. PURPOSE: Targeted for applications where exposure to assembly processes, environmental conditions, and contamination may promote the development of cuprous / cupric oxide corrosion (a.k.a. Red Plague) in silver-coated copper wire, cable, and harness assemblies. Does not exclude any alternate or contractor-proprietary documents or processes that meet or exceed the baseline of requirements established by this document. Use of alternate or contractor-proprietary documents or processes shall require review and prior approval of the procuring NASA activity.

  18. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowsell, David Leon

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  19. 40 CFR 52.720 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Illinois Pollution Control Board Regulations, Chapter 2, Parts I, II and III were submitted May 4, 1972, by the Governor. (3) A document describing the role of the Chicago Department of Environmental Control...) Compliance schedules submitted on March 13, 1973, by the Pollution Control Board. (6) Compliance schedules...

  20. 40 CFR 52.220 - Identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Pollution Control District. (i) Previously approved on September 22, 1972 and now deleted without... and other Legal Documents Pertinent to Air Pollution Control in California”) to chapter 7. (13) El Dorado County Air Pollution Control District. (i) Previously approved on May 31, 1972 in paragraph (b) of...

  1. 40 CFR 52.220 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 43, and 44. (5) Ventura County Air Pollution Control District. (i) Previously approved on September... (“State Statutes and other Legal Documents Pertinent to Air Pollution Control in California”) to chapter 7. (13) El Dorado County Air Pollution Control District. (i) Previously approved on May 31, 1972 in...

  2. 40 CFR 52.720 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Illinois Pollution Control Board Regulations, Chapter 2, Parts I, II and III were submitted May 4, 1972, by the Governor. (3) A document describing the role of the Chicago Department of Environmental Control...) Compliance schedules submitted on March 13, 1973, by the Pollution Control Board. (6) Compliance schedules...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbee, D; McCarthy, A; Galavis, P

    Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# tomore » check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria database queries, and eventual automated plan checks.« less

  4. Proposed methods for testing and selecting the ERCC external RNA controls

    PubMed Central

    2005-01-01

    The External RNA Control Consortium (ERCC) is an ad-hoc group with approximately 70 members from private, public, and academic organizations. The group is developing a set of external RNA control transcripts that can be used to assess technical performance in gene expression assays. The ERCC is now initiating the Testing Phase of the project, during which candidate external RNA controls will be evaluated in both microarray and QRT-PCR gene expression platforms. This document describes the proposed experiments and informatics process that will be followed to test and qualify individual controls. The ERCC is distributing this description of the proposed testing process in an effort to gain consensus and to encourage feedback from the scientific community. On October 4–5, 2005, the ERCC met to further review the document, clarify ambiguities, and plan next steps. A summary of this meeting and changes to the test plan are provided as an appendix to this manuscript. PMID:16266432

  5. Designing the Horizons of Your Small Business.

    ERIC Educational Resources Information Center

    Helgemo, Robert R.

    This manual outlines the planning process for developing a feasibility study for a small business. The material is composed of three parts: the planning documents filled out for an imaginary campground; a business plan summarized from the planning documents; and blank planning documents with introductions and instructions. The documents can be…

  6. 40 CFR 52.220 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Rules 40, 42, 43, and 44. (5) Ventura County Air Pollution Control District. (i) Previously approved on... contained in appendix II (“State Statutes and other Legal Documents Pertinent to Air Pollution Control in California”) to chapter 7. (13) El Dorado County Air Pollution Control District. (i) Previously approved on...

  7. 40 CFR 52.220 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Rules 40, 42, 43, and 44. (5) Ventura County Air Pollution Control District. (i) Previously approved on... (“State Statutes and other Legal Documents Pertinent to Air Pollution Control in California”) to chapter 7. (13) El Dorado County Air Pollution Control District. (i) Previously approved on May 31, 1972 in...

  8. Quality Control Study of the GSL Reinsurance System. Final Report.

    ERIC Educational Resources Information Center

    Advanced Technology, Inc., Reston, VA.

    A quality control plan for the U.S. Department of Education's Guaranteed Student Loan (GSL) reinsurance process was developed. To identify existing errors, systems documentation and past analyses of the reinsurance system were analyzed, and interviews were conducted. Corrective actions were proposed, and a quality control checklist was developed…

  9. Manpower Planning Criteria Manual, Construction Grants Section.

    ERIC Educational Resources Information Center

    Texas State Dept. of Water Resources, Austin.

    This document presents the material developed in conjunction with a project directed to test a methodology that a state water pollution control agency can use in determining its manpower and training needs. Included is a compilation of the manpower planning criteria used to relate numbers and types of personnel with deferred workloads. It also…

  10. Robot Service and Repair. Teacher's Guide.

    ERIC Educational Resources Information Center

    Pittsburg State Univ., KS. Kansas Vocational Curriculum Dissemination Center.

    This document is a teacher's guide for teaching a course on robot service and repair. The guide is organized in four units covering the following topics: introduction to robots, power supply, robot control systems, and service and repair. Each unit contains several lesson plans on the unit topic. Lesson plans consist of objectives, tools and…

  11. Robot Service and Repair. Student Guide.

    ERIC Educational Resources Information Center

    Pittsburg State Univ., KS. Kansas Vocational Curriculum Dissemination Center.

    This document is a student guide for a course on robot service and repair. It is organized in four units covering the following topics: introduction to robots, power supply, robot control systems, and service and repair. Each unit contains several lesson plans on the unit topic. Lesson plans consist of lesson objectives, lists of teaching aids and…

  12. Model Bloodborne Pathogens: Exposure Control Plan for Wisconsin Public Schools. Bulletin No. 93311.

    ERIC Educational Resources Information Center

    Wisconsin State Dept. of Public Instruction, Madison.

    This document is intended to assist local school districts in complying with the Wisconsin Department of Industry, Labor and Human Relations (DILHR) Health and Safety Standard. Following an overview of the plan, the guide is organized into six chapters: (1) "Exposure Determination" discusses job classifications, tasks, and procedures;…

  13. Randomized Trial of Reducing Ambulatory Malpractice and Safety Risk: Results of the Massachusetts PROMISES Project.

    PubMed

    Schiff, Gordon D; Reyes Nieva, Harry; Griswold, Paula; Leydon, Nicholas; Ling, Judy; Federico, Frank; Keohane, Carol; Ellis, Bonnie R; Foskett, Cathy; Orav, E John; Yoon, Catherine; Goldmann, Don; Weissman, Joel S; Bates, David W; Biondolillo, Madeleine; Singer, Sara J

    2017-08-01

    Evaluate application of quality improvement approaches to key ambulatory malpractice risk and safety areas. In total, 25 small-to-medium-sized primary care practices (16 intervention; 9 control) in Massachusetts. Controlled trial of a 15-month intervention including exposure to a learning network, webinars, face-to-face meetings, and coaching by improvement advisors targeting "3+1" high-risk domains: test result, referral, and medication management plus culture/communication issues evaluated by survey and chart review tools. Chart reviews conducted at baseline and postintervention for intervention sites. Staff and patient survey data collected at baseline and postintervention for intervention and control sites. Chart reviews demonstrated significant improvements in documentation of abnormal results, patient notification, documentation of an action or treatment plan, and evidence of a completed plan (all P<0.001). Mean days between laboratory test date and evidence of completed action/treatment plan decreased by 19.4 days (P<0.001). Staff surveys showed modest but nonsignificant improvement for intervention practices relative to controls overall and for the 3 high-risk domains that were the focus of PROMISES. A consortium of stakeholders, quality improvement tools, coaches, and learning network decreased selected ambulatory safety risks often seen in malpractice claims.

  14. Review of Ground Systems Development and Operations (GSDO) Tools for Verifying Command and Control Software

    NASA Technical Reports Server (NTRS)

    Aguilar, Michael L.; Bonanne, Kevin H.; Favretto, Jeffrey A.; Jackson, Maddalena M.; Jones, Stephanie L.; Mackey, Ryan M.; Sarrel, Marc A.; Simpson, Kimberly A.

    2014-01-01

    The Exploration Systems Development (ESD) Standing Review Board (SRB) requested the NASA Engineering and Safety Center (NESC) conduct an independent review of the plan developed by Ground Systems Development and Operations (GSDO) for identifying models and emulators to create a tool(s) to verify their command and control software. The NESC was requested to identify any issues or weaknesses in the GSDO plan. This document contains the outcome of the NESC review.

  15. Fabrication Control Plan for ORNL RH-LOCA ATF Test Specimens to be Irradiated in the ATR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Field, Kevin G.; Howard, Richard; Teague, Michael

    2014-06-01

    The purpose of this fabrication plan is (1) to summarize the design of a set of rodlets that will be fabricated and then irradiated in the Advanced Test Reactor (ATR) and (2) provide requirements for fabrication and acceptance criteria for inspections of the Light Water Reactor (LWR) – Accident Tolerant Fuels (ATF) rodlet components. The functional and operational (F&OR) requirements for the ATF program are identified in the ATF Test Plan. The scope of this document only covers fabrication and inspections of rodlet components detailed in drawings 604496 and 604497. It does not cover the assembly of these items tomore » form a completed test irradiation assembly or the inspection of the final assembly, which will be included in a separate INL final test assembly specification/inspection document. The controls support the requirements that the test irradiations must be performed safely and that subsequent examinations must provide valid results.« less

  16. IMP-J attitude control prelaunch analysis and operations plan

    NASA Technical Reports Server (NTRS)

    Hooper, H. L.; Mckendrew, J. B.; Repass, G. D.

    1973-01-01

    A description of the attitude control support being supplied for the Explorer 50 mission is given. Included in the document are descriptions of the computer programs being used to support attitude determination, prediction, and control for the mission and descriptions of the operating procedures that will be used to accomplish mission objectives.

  17. 78 FR 3837 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... requires the auditor additionally to obtain an understanding of the internal controls environment for the company, which requires the development of certain documentation, such as internal controls procedures... detailed understanding of the internal controls environment, a CPA review generally is less costly than a...

  18. Volume 3 - Area Sources and Area Source Method Abstracts

    EPA Pesticide Factsheets

    Nonpoint (area) source emission reference materials from the EIIP. Provides nonpoint source guidance on planning, emissions estimation, data collection, inventory documentation and reporting, and quality assurance/quality control.

  19. 77 FR 745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0547; FRL-9480-1] Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) Correction In rule document 2011-33660 appearing on pages 214-217 in the issue of Wednesday...

  20. 21 CFR 822.8 - When, where, and how must I submit my postmarket surveillance plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... submission to the Document Control Center (HFM-99), Center for Biologics Evaluation and Research, Food and... Document Room, Center for Drug Evaluation and Research, Food and Drug Administration, 5901-B Ammendale Rd... 21 Food and Drugs 8 2010-04-01 2010-04-01 false When, where, and how must I submit my postmarket...

  1. Seismology software: state of the practice

    NASA Astrophysics Data System (ADS)

    Smith, W. Spencer; Zeng, Zheng; Carette, Jacques

    2018-05-01

    We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.

  2. Seismology software: state of the practice

    NASA Astrophysics Data System (ADS)

    Smith, W. Spencer; Zeng, Zheng; Carette, Jacques

    2018-02-01

    We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.

  3. Effect of the PREPARE Website vs an Easy-to-Read Advance Directive on Advance Care Planning Documentation and Engagement Among Veterans: A Randomized Clinical Trial.

    PubMed

    Sudore, Rebecca L; Boscardin, John; Feuz, Mariko A; McMahan, Ryan D; Katen, Mary T; Barnes, Deborah E

    2017-08-01

    Documentation rates of patients' medical wishes are often low. It is unknown whether easy-to-use, patient-facing advance care planning (ACP) interventions can overcome barriers to planning in busy primary care settings. To compare the efficacy of an interactive, patient-centered ACP website (PREPARE) with an easy-to-read advance directive (AD) to increase planning documentation. This was a comparative effectiveness randomized clinical trial from April 2013 to July 2016 conducted at multiple primary care clinics at the San Francisco VA Medical Center. Inclusion criteria were age of a least 60 years; at least 2 chronic and/or serious conditions; and 2 or more primary care visits; and 2 or more additional clinic, hospital, or emergency room visits in the last year. Participants were randomized to review PREPARE plus an easy-to-read AD or the AD alone. There were no clinician and/or system-level interventions or education. Research staff were blinded for all follow-up measurements. The primary outcome was new ACP documentation (ie, legal forms and/or discussions) at 9 months. Secondary outcomes included patient-reported ACP engagement at 1 week, 3 months, and 6 months using validated surveys of behavior change process measures (ie, 5-point knowledge, self-efficacy, readiness scales) and action measures (eg, surrogate designation, using a 0-25 scale). We used intention-to-treat, mixed-effects logistic and linear regression, controlling for time, health literacy, race/ethnicity, baseline ACP, and clustering by physician. The mean (SD) age of 414 participants was 71 (8) years, 38 (9%) were women, 83 (20%) had limited literacy, and 179 (43%) were nonwhite. No participant characteristic differed significantly among study arms at baseline. Retention at 6 months was 90%. Advance care planning documentation 6 months after enrollment was higher in the PREPARE arm vs the AD-alone arm (adjusted 35% vs 25%; odds ratio, 1.61 [95% CI, 1.03-2.51]; P = .04). PREPARE also resulted in higher self-reported ACP engagement at each follow-up, including higher process and action scores; P <.001 at each follow-up). Easy-to-use, patient-facing ACP tools, without clinician- and/or system-level interventions, can increase planning documentation 25% to 35%. Combining the PREPARE website with an easy-to-read AD resulted in higher planning documentation than the AD alone, suggesting that PREPARE may increase planning documentation with minimal health care system resources. clinicaltrials.gov Identifier: NCT01550731.

  4. Artificial Intelligence for Controlling Robotic Aircraft

    NASA Technical Reports Server (NTRS)

    Krishnakumar, Kalmanje

    2005-01-01

    A document consisting mostly of lecture slides presents overviews of artificial-intelligence-based control methods now under development for application to robotic aircraft [called Unmanned Aerial Vehicles (UAVs) in the paper] and spacecraft and to the next generation of flight controllers for piloted aircraft. Following brief introductory remarks, the paper presents background information on intelligent control, including basic characteristics defining intelligent systems and intelligent control and the concept of levels of intelligent control. Next, the paper addresses several concepts in intelligent flight control. The document ends with some concluding remarks, including statements to the effect that (1) intelligent control architectures can guarantee stability of inner control loops and (2) for UAVs, intelligent control provides a robust way to accommodate an outer-loop control architecture for planning and/or related purposes.

  5. GCS plan for software aspects of certification

    NASA Technical Reports Server (NTRS)

    Shagnea, Anita M.; Lowman, Douglas S.; Withers, B. Edward

    1990-01-01

    As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.

  6. NIF Operations Management Plan, August 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Wonterghem, Bruno M.

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sailer, S.J.

    This Quality Assurance Project Plan (QAPJP) specifies the quality of data necessary and the characterization techniques employed at the Idaho National Engineering Laboratory (INEL) to meet the objectives of the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Transuranic Waste Characterization Quality Assurance Program Plan (QAPP) requirements. This QAPJP is written to conform with the requirements and guidelines specified in the QAPP and the associated documents referenced in the QAPP. This QAPJP is one of a set of five interrelated QAPjPs that describe the INEL Transuranic Waste Characterization Program (TWCP). Each of the five facilities participating in the TWCPmore » has a QAPJP that describes the activities applicable to that particular facility. This QAPJP describes the roles and responsibilities of the Idaho Chemical Processing Plant (ICPP) Analytical Chemistry Laboratory (ACL) in the TWCP. Data quality objectives and quality assurance objectives are explained. Sample analysis procedures and associated quality assurance measures are also addressed; these include: sample chain of custody; data validation; usability and reporting; documentation and records; audits and 0385 assessments; laboratory QC samples; and instrument testing, inspection, maintenance and calibration. Finally, administrative quality control measures, such as document control, control of nonconformances, variances and QA status reporting are described.« less

  8. Winter Simulation Conference, Miami Beach, Fla., December 4-6, 1978, Proceedings. Volumes 1 & 2

    NASA Technical Reports Server (NTRS)

    Highland, H. J. (Editor); Nielsen, N. R.; Hull, L. G.

    1978-01-01

    The papers report on the various aspects of simulation such as random variate generation, simulation optimization, ranking and selection of alternatives, model management, documentation, data bases, and instructional methods. Simulation studies in a wide variety of fields are described, including system design and scheduling, government and social systems, agriculture, computer systems, the military, transportation, corporate planning, ecosystems, health care, manufacturing and industrial systems, computer networks, education, energy, production planning and control, financial models, behavioral models, information systems, and inventory control.

  9. 40 CFR 62.11620 - Identification of plan-negative declaration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Virginia Fluoride Emissions from Existing Primary Aluminum Plants § 62.11620 Identification of... emission guidelines set forth in the Final Guideline Document for the Control of Fluoride Emissions from...

  10. 40 CFR 62.11620 - Identification of plan-negative declaration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... POLLUTANTS Virginia Fluoride Emissions from Existing Primary Aluminum Plants § 62.11620 Identification of... emission guidelines set forth in the Final Guideline Document for the Control of Fluoride Emissions from...

  11. SU-G-TeP4-06: An Integrated Application for Radiation Therapy Treatment Plan Directives, Management, and Reporting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matuszak, M; Anderson, C; Lee, C

    Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less

  12. A Descriptive Analysis of End-of-Life Conversations With Long-Term Glioblastoma Survivors.

    PubMed

    Miranda, Stephen P; Bernacki, Rachelle E; Paladino, Joanna M; Norden, Andrew D; Kavanagh, Jane E; Palmor, Marissa C; Block, Susan D

    2018-05-01

    Early, high-quality serious illness (SI) conversations are critical for patients with glioblastoma (GBM) but are often mistimed or mishandled. To describe the prevalence, timing, and quality of documented SI conversations and evaluate their focus on patient goals/priorities. Thirty-three patients with GBM enrolled in the control group of a randomized controlled trial of a communication intervention and were followed for 2 years or until death. At baseline, all patients answered a validated question about preferences for life-extending versus comfort-focused care and completed a Life Priorities Survey about their goals/priorities. In this secondary analysis, retrospective chart review was performed for 18 patients with GBM who died. Documented SI conversations were systematically identified and evaluated using a codebook reflecting 4 domains: prognosis, goals/priorities, end-of-life planning, and life-sustaining treatments. Patient goals/priorities were compared to documentation. At baseline, 16 of 24 patients preferred life-extending care. In the Life Priorities Survey, goals/priorities most frequently ranked among the top 3 were "Live as long as possible," "Be mentally aware," "Provide support for family," "Be independent," and "Be at peace." Fifteen of 18 patients had at least 1 documented SI conversation (range: 1-4). Median timing of the first documented SI conversation was 84 days before death (range: 29-231; interquartile range: 46-119). Fifteen patients had documentation about end-of-life planning, with "hospice" and "palliative care" most frequently documented. Five of 18 patients had documentation about their goals. Patients with GBM had multiple goals/priorities with potential treatment implications, but documentation showed SI conversations occurred relatively late and infrequently reflected patient goals/priorities.

  13. Integrated propulsion technology demonstrator. Program plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

  14. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... must cover the arrangements and operation of the system as a whole and must specifically describe parts.... This documentation must include the vibration report for the control section of the monitoring section...

  15. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... must cover the arrangements and operation of the system as a whole and must specifically describe parts.... This documentation must include the vibration report for the control section of the monitoring section...

  16. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must cover the arrangements and operation of the system as a whole and must specifically describe parts.... This documentation must include the vibration report for the control section of the monitoring section...

  17. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... must cover the arrangements and operation of the system as a whole and must specifically describe parts.... This documentation must include the vibration report for the control section of the monitoring section...

  18. Bipolar lead-acid batteries for electrical actuation applications

    NASA Technical Reports Server (NTRS)

    Pierce, Douglas C.; Gentry, William O.; Hall, David

    1994-01-01

    This document presents in viewgraph format information on bipolar battery development at Johnson Controls, Incorporated. The organization structure, goals, progress to date, future plans, and battery parameters and electrical properties are given.

  19. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  20. 75 FR 13125 - Pet Spot-On Analysis and Mitigation Plan Available for Public Comment; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2010-0229; FRL-8816-8] Pet Spot-On Analysis and... registered pet spot-on products to control fleas and ticks and a mitigation plan. The analysis consists of a Technical Review Document and Data Evaluation Records for pet spot-on products. The Agency is requesting...

  1. 77 FR 57863 - Approval and Promulgation of Implementation Plans; State of Montana; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    ... of the multiple Class I areas that are affected by Corette, the Lime Spray Dryer (LSD) SO 2 control... preventing any future and remedying any existing man-made impairment of visibility in mandatory Class I areas... documents in the docket are listed on the www.regulations.gov Web site. Although listed in the index, some...

  2. 20 CFR 668.710 - What planning documents must an INA grantee submit?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an INA grantee... Planning/Funding Process § 668.710 What planning documents must an INA grantee submit? Each grantee... participant services and expenditures covering the two-year planning cycle. We will, in consultation with the...

  3. Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface Water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-10-01

    The Y-12 Plant conducts a surface water monitoring program in response to DOE Orders and state of Tennessee requirements under the National Pollutant Discharge Elimination System (NPDES). The anticipated codification of DOE Order 5400.5 for radiation protection of the public and the environment (10 CFR Part 834) will require an environmental radiation protection plan (ERPP). The NPDES permit issued by the state of Tennessee requires a radiological monitoring plan (RMP) for Y-12 Plant surface waters. In a May 4, 1995 memo, the state of Tennessee, Division of Water Pollution Control, stated their desired needs and goals regarding the content ofmore » RMPs, associated documentation, and data resulting from the RMPs required under the NPDES permitting system (L. Bunting, General Discussion, Radiological Monitoring Plans, Tennessee Division of Water Pollution Control, May 4,1995). Appendix A provides an overview of how the Y-12 Plant will begin to address these needs and goals. It provides a more complete, documented basis for the current Y-12 Plant surface water monitoring program and is intended to supplement documentation provided in the Annual Site Environmental Reports (ASERs), NPDES reports, Groundwater Quality Assessment Reports, and studies conducted under the Y-12 Plant Environmental Restoration (ER) Program. The purpose of this update to the Y-12 Plant RMP is to satisfy the requirements of the current NPDES permit, DOE Order 5400.5, and 10 CFR Part 834, as current proposed, by defining the radiological monitoring plan for surface water for the Y-12 Plant. This plan includes initial storm water monitoring and data analysis. Related activities such as sanitary sewer and sediment monitoring are also summarized. The plan discusses monitoring goals necessary to determine background concentrations of radionuclides, to quantify releases, determine trends, satisfy regulatory requirements, support consequence assessments, and meet requirements that releases be ``as low as reasonably achievable`` (ALARA).« less

  4. Guidance and Control Software Project Data - Volume 2: Development Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  5. Ozone: Stage Two Vapor Recovery Rule and Guidance

    EPA Pesticide Factsheets

    This page includes the guidance document, fact sheet, memorandum, and final rule on removing Stage II Gasoline Vapor Control Programs from State Implementation Plans (SIP) for the Ozone National Ambient Air Quality Standards (NAAQS)

  6. Master Pump Shutdown MPS Software Quality Assurance Plan (SQAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BEVINS, R.R.

    2000-09-20

    The MPSS Software Quality Assurance (SQAP) describes the tools and strategy used in the development of the MPSS software. The document also describes the methodology for controlling and managing changes to the software.

  7. Indianapolis Area ITS Early Deployment Plan Final Report

    DOT National Transportation Integrated Search

    1996-07-01

    PUBLIC-PRIVATE PARTNERSHIP, TRAFFIC SIGNAL CONTROL, REGIONAL MULTIMODAL TRAVEL INFORMATION, ADVANCED RURAL TRANSPORTATION SYSTEMS OR ARTS : THIS DOCUMENT LAYS OUT A 20-YEAR SCHEDULE FOR THE IMPLEMENTATION OF ITS IN THE INDIANAPOLIS AREA. THE REPOR...

  8. Semantic Metadata for Heterogeneous Spatial Planning Documents

    NASA Astrophysics Data System (ADS)

    Iwaniak, A.; Kaczmarek, I.; Łukowicz, J.; Strzelecki, M.; Coetzee, S.; Paluszyński, W.

    2016-09-01

    Spatial planning documents contain information about the principles and rights of land use in different zones of a local authority. They are the basis for administrative decision making in support of sustainable development. In Poland these documents are published on the Web according to a prescribed non-extendable XML schema, designed for optimum presentation to humans in HTML web pages. There is no document standard, and limited functionality exists for adding references to external resources. The text in these documents is discoverable and searchable by general-purpose web search engines, but the semantics of the content cannot be discovered or queried. The spatial information in these documents is geographically referenced but not machine-readable. Major manual efforts are required to integrate such heterogeneous spatial planning documents from various local authorities for analysis, scenario planning and decision support. This article presents results of an implementation using machine-readable semantic metadata to identify relationships among regulations in the text, spatial objects in the drawings and links to external resources. A spatial planning ontology was used to annotate different sections of spatial planning documents with semantic metadata in the Resource Description Framework in Attributes (RDFa). The semantic interpretation of the content, links between document elements and links to external resources were embedded in XHTML pages. An example and use case from the spatial planning domain in Poland is presented to evaluate its efficiency and applicability. The solution enables the automated integration of spatial planning documents from multiple local authorities to assist decision makers with understanding and interpreting spatial planning information. The approach is equally applicable to legal documents from other countries and domains, such as cultural heritage and environmental management.

  9. The Age of Confusion. Why So Many Teens Are Getting Pregnant, Turning to Welfare and Ending up Homeless.

    ERIC Educational Resources Information Center

    Homes for the Homeless, Inc., New York, NY.

    This report documents a history of unintended pregnancy, premature motherhood, and failure to plan for the future. Research indicates that most homeless young women are aware of birth control, but few of those who became pregnant were able to translate this knowledge into practice. The failure of homeless mothers to engage in family planning is…

  10. 20 CFR 669.510 - What planning documents must an NFJP grantee submit?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Performance Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP...

  11. 32 CFR 813.6 - Planning and requesting combat documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Joint Operation Planning and Execution System, that in turn, requests support from HQ AMC. HQ USAF can... 32 National Defense 6 2010-07-01 2010-07-01 false Planning and requesting combat documentation... SALES AND SERVICES VISUAL INFORMATION DOCUMENTATION PROGRAM § 813.6 Planning and requesting combat...

  12. 36 CFR 219.14 - Decision document and planning records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... planning records. 219.14 Section 219.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... records. (a) Decision document. The responsible official shall record approval of a new plan, plan... (§ 219.15); (4) The documentation of how the best available scientific information was used to inform...

  13. 36 CFR 219.14 - Decision document and planning records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... planning records. 219.14 Section 219.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... records. (a) Decision document. The responsible official shall record approval of a new plan, plan... (§ 219.15); (4) The documentation of how the best available scientific information was used to inform...

  14. Guidance and Control Software Project Data - Volume 3: Verification Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the verification documents from the GCS project. Volume 3 contains four appendices: A. Software Verification Cases and Procedures for the Guidance and Control Software Project; B. Software Verification Results for the Pluto Implementation of the Guidance and Control Software; C. Review Records for the Pluto Implementation of the Guidance and Control Software; and D. Test Results Logs for the Pluto Implementation of the Guidance and Control Software.

  15. Development of a Software Tool to Automate ADCO Flight Controller Console Planning Tasks

    NASA Technical Reports Server (NTRS)

    Anderson, Mark G.

    2011-01-01

    This independent study project covers the development of the International Space Station (ISS) Attitude Determination and Control Officer (ADCO) Planning Exchange APEX Tool. The primary goal of the tool is to streamline existing manual and time-intensive planning tools into a more automated, user-friendly application that interfaces with existing products and allows the ADCO to produce accurate products and timelines more effectively. This paper will survey the current ISS attitude planning process and its associated requirements, goals, documentation and software tools and how a software tool could simplify and automate many of the planning actions which occur at the ADCO console. The project will be covered from inception through the initial prototype delivery in November 2011 and will include development of design requirements and software as well as design verification and testing.

  16. QUALITY CONTROL - VARIABILITY IN PROTOCOLS

    EPA Science Inventory

    The EPA Risk Reduction Engineering Laboratory’s Quality Assurance Office, which published the popular pocket guide Preparing Perfect Project Plans, is now introducing another quality assurance reference aid. The document Variability in Protocols (VIP) was initially designed as a ...

  17. Advance Care Planning in an Accountable Care Organization Is Associated with Increased Advanced Directive Documentation and Decreased Costs.

    PubMed

    Bond, William F; Kim, Minchul; Franciskovich, Chris M; Weinberg, Jason E; Svendsen, Jessica D; Fehr, Linda S; Funk, Amy; Sawicki, Robert; Asche, Carl V

    2018-04-01

    Advance care planning (ACP) documents patient wishes and increases awareness of palliative care options. To study the association of outpatient ACP with advanced directive documentation, utilization, and costs of care. This was a case-control study of cases with ACP who died matched 1:1 with controls. We used 12 months of data pre-ACP/prematch and predeath. We compared rates of documentation with logit model regression and conducted a difference-in-difference analysis using generalized linear models for utilization and costs. Medicare beneficiaries attributed to a large rural-suburban-small metro multisite accountable care organization from January 2013 to April 2016, with cross reference to ACP facilitator logs to find cases. The presence of advance directive forms was verified by chart review. Cost analysis included all utilization and costs billed to Medicare. We matched 325 cases and 325 controls (51.1% female and 48.9% male, mean age 81). 320/325 (98.5%) ACP versus 243/325 (74.8%) of controls had a Healthcare Power of Attorney (odds ratio [OR] 21.6, 95% CI 8.6-54.1) and 172/325(52.9%) ACP versus 145/325 (44.6%) controls had Practitioner Orders for Life Sustaining Treatment (OR 1.40, 95% CI 1.02-1.90) post-ACP/postmatch. Adjusted results showed ACP cases had fewer inpatient admissions (-0.37 admissions, 95% CI -0.66 to -0.08), and inpatient days (-3.66 days, 95% CI -6.23 to -1.09), with no differences in hospice, hospice days, skilled nursing facility use, home health use, 30-day readmissions, or emergency department visits. Adjusted costs were $9,500 lower in the ACP group (95% CI -$16,207 to -$2,793). ACP increases documentation and was associated with a reduction in overall costs driven primarily by a reduction in inpatient utilization. Our data set was limited by small numbers of minorities and cancer patients.

  18. Hierarchical Control and Trajectory Planning

    NASA Technical Reports Server (NTRS)

    Martin, Clyde F.; Horn, P. W.

    1994-01-01

    Most of the time on this project was spent on the trajectory planning problem. The construction is equivalent to the classical spline construction in the case that the system matrix is nilpotent. If the dimension of the system is n then the spline of degree 2n-1 is constructed. This gives a new approach to the construction of splines that is more efficient than the usual construction and at the same time allows the construction of a much larger class of splines. All known classes of splines are reconstructed using the approach of linear control theory. As a numerical analysis tool control theory gives a very good tool for constructing splines. However, for the purposes of trajectory planning it is quite another story. Enclosed in this document are four reports done under this grant.

  19. 20 CFR 669.510 - What planning documents must an NFJP grantee submit?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP grantee submit? Each...

  20. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  1. Disease control operations

    USGS Publications Warehouse

    Friend, M.; Franson, J.C.

    1999-01-01

    Individual disease outbreaks have killed many thousands of animals on numerous occasions. Tens of thousands of migratory birds have died in single die-offs with as many as 1,000 birds succumbing in 1 day. The ability to successfully combat such explosive situations is highly dependent on the readiness of field personnel to deal with them. Because many disease agents can spread through wildlife populations very quickly, advance preparation is essential for preventing infected animals from spreading disease to additional species and locations. Carefully thought-out disease contingency plans should be developed as practical working documents for field personnel and updated as necessary. Well-designed plans can prove invaluable in minimizing wildlife losses and the costs associated with disease control activities.Although requirements for disease control operations vary and must be tailored to each situation, all disease contingency planning involves general concepts and basic biological information. This chapter, which is intended to be a practical guide, identifies the major activities and needs of disease control operations, and relates them to disease contingency planning.

  2. The quality of paper-based versus electronic nursing care plan in Australian aged care homes: A documentation audit study.

    PubMed

    Wang, Ning; Yu, Ping; Hailey, David

    2015-08-01

    The nursing care plan plays an essential role in supporting care provision in Australian aged care. The implementation of electronic systems in aged care homes was anticipated to improve documentation quality. Standardized nursing terminologies, developed to improve communication and advance the nursing profession, are not required in aged care practice. The language used by nurses in the nursing care plan and the effect of the electronic system on documentation quality in residential aged care need to be investigated. To describe documentation practice for the nursing care plan in Australian residential aged care homes and to compare the quantity and quality of documentation in paper-based and electronic nursing care plans. A nursing documentation audit was conducted in seven residential aged care homes in Australia. One hundred and eleven paper-based and 194 electronic nursing care plans, conveniently selected, were reviewed. The quantity of documentation in a care plan was determined by the number of phrases describing a resident problem and the number of goals and interventions. The quality of documentation was measured using 16 relevant questions in an instrument developed for the study. There was a tendency to omit 'nursing problem' or 'nursing diagnosis' in the nursing process by changing these terms (used in the paper-based care plan) to 'observation' in the electronic version. The electronic nursing care plan documented more signs and symptoms of resident problems and evaluation of care than the paper-based format (48.30 vs. 47.34 out of 60, P<0.01), but had a lower total mean quality score. The electronic care plan contained fewer problem or diagnosis statements, contributing factors and resident outcomes than the paper-based system (P<0.01). Both types of nursing care plan were weak in documenting measurable and concrete resident outcomes. The overall quality of documentation content for the nursing process was no better in the electronic system than in the paper-based system. Omission of the nursing problem or diagnosis from the nursing process may reflect a range of factors behind the practice that need to be understood. Further work is also needed on qualitative aspects of the nurse care plan, nurses' attitudes towards standardized terminologies and the effect of different documentation practice on care quality and resident outcomes. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  3. Map showing areas serviced by public water-supply agencies in 1973 Greater Pittsburgh region, southwestern Pennsylvania

    USGS Publications Warehouse

    Beall, Robert M.

    1974-01-01

    Urban water planning, development, and management are many sectored, costly efforts, subject to a multitude of controls and demands including those imposed by nature. One primary concern in development is for providing a dependable and safe water supply. In spite of a bountiful natural availability, the process of satisfying consumer needs involves the resolution of a variety of problems, not the least of which are cooperation and coordination among suppliers. One of the fundamental requisites in seeking sound solutions to developmental and environmental problems is inventory documentation. This map is one facet of documentation; the data listing, given on sheet 2, is the companion inventory. These supplement State, regional, and local efforts directed toward both long-range planning and current evaluation programs. Such documentation also assists the assessment of the effect of one water-management subsystem on hydrologic characteristics.

  4. [Multimodal document management in radiotherapy].

    PubMed

    Fahrner, H; Kirrmann, S; Röhner, F; Schmucker, M; Hall, M; Heinemann, F

    2013-12-01

    After incorporating treatment planning and the organisational model of treatment planning in the operating schedule system (BAS, "Betriebsablaufsystem"), complete document qualities were embedded in the digital environment. The aim of this project was to integrate all documents independent of their source (paper-bound or digital) and to make content from the BAS available in a structured manner. As many workflow steps as possible should be automated, e.g. assigning a document to a patient in the BAS. Additionally it must be guaranteed that at all times it could be traced who, when, how and from which source documents were imported into the departmental system. Furthermore work procedures should be changed that the documentation conducted either directly in the departmental system or from external systems can be incorporated digitally and paper document can be completely avoided (e.g. documents such as treatment certificate, treatment plans or documentation). It was a further aim, if possible, to automate the removal of paper documents from the departmental work flow, or even to make such paper documents superfluous. In this way patient letters for follow-up appointments should automatically generated from the BAS. Similarly patient record extracts in the form of PDF files should be enabled, e.g. for controlling purposes. The available document qualities were analysed in detail by a multidisciplinary working group (BAS-AG) and after this examination and assessment of the possibility of modelling in our departmental workflow (BAS) they were transcribed into a flow diagram. The gathered specifications were implemented in a test environment by the clinical and administrative IT group of the department of radiation oncology and subsequent to a detailed analysis introduced into clinical routine. The department has succeeded under the conditions of the aforementioned criteria to embed all relevant documents in the departmental workflow via continuous processes. Since the completion of the concepts and the implementation in our test environment 15,000 documents were introduced into the departmental workflow following routine approval. Furthermore approximately 5000 appointment letters for patient aftercare per year were automatically generated by the BAS. In addition patient record extracts in the form of PDF files for the medical services of the healthcare insurer can be generated.

  5. Environmental Justice analysis in Hydraulic Fracturing Analysis, June 13, 2011

    EPA Pesticide Factsheets

    This planning document describes the quality assurance/quality control activities and technical requirements that will be used during the research study, using an index-based approach to compare a nationally representative set of well sites fractured.

  6. Human Factors Integration Challenges in the Terminal Radar Approach Control (TRACON) Environment

    DOT National Transportation Integrated Search

    2003-01-01

    This document describes human factors challenges that need to be considered in the implementation of planned enhancements to : the Standard Terminal Automation Replacement System (STARS), Common Automated Radar Terminal System (ARTS), and the : ARTS ...

  7. Human factors integration challenges in the terminal radar approach control (TRACON) environment

    DOT National Transportation Integrated Search

    2003-01-31

    This document describes human factors challenges that need to be considered in the implementation of planned enhancements to the Standard Terminal Automation Replacement System (STARS), Common Automated Radar terminal System (ARTS), and the ARTS Colo...

  8. 77 FR 76510 - Prime Hook National Wildlife Refuge, Sussex County, DE; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... included climate change, sea level rise, refuge marshes, habitat and wildlife species management, mosquito... adulticides for mosquito control when there is a documented human disease threat, instead of only when a...

  9. Care planning for aggression management in a specialist secure mental health service: An audit of user involvement.

    PubMed

    Hallett, Nutmeg; Huber, Jörg W; Sixsmith, Judith; Dickens, Geoffrey L

    2016-12-01

    This paper describes an audit of prevention and management of violence and aggression care plans and incident reporting forms which aimed to: (i) report the compliance rate of completion of care plans; (ii) identify the extent to which patients contribute to and agree with their care plan; (iii) describe de-escalation methods documented in care plans; and (iv) ascertain the extent to which the de-escalation methods described in the care plan are recorded as having been attempted in the event of an incident. Care plans and incident report forms were examined for all patients in men's and women's mental health care pathways who were involved in aggressive incidents between May and October 2012. In total, 539 incidents were examined, involving 147 patients and 121 care plans. There was no care plan in place at the time of 151 incidents giving a compliance rate of 72%. It was documented that 40% of patients had contributed to their care plans. Thematic analysis of de-escalation methods documented in the care plans revealed five de-escalation themes: staff interventions, interactions, space/quiet, activities and patient strategies/skills. A sixth category, coercive strategies, was also documented. Evidence of adherence to de-escalation elements of the care plan was documented in 58% of incidents. The reasons for the low compliance rate and very low documentation of patient involvement need further investigation. The inclusion of coercive strategies within de-escalation documentation suggests that some staff fundamentally misunderstand de-escalation. © 2016 Australian College of Mental Health Nurses Inc.

  10. 14 CFR 77.2 - Definition of terms.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... approach system is planned and is so indicated by an FAA approved airport layout plan; a military service approved military airport layout plan; any other FAA planning document, or military service military... layout plan, a military service approved military airport layout plan, or by any planning document...

  11. Documenting Living Monuments in Indonesia: Methodology for Sustainable Utility

    NASA Astrophysics Data System (ADS)

    Suryaningsih, F.; Purwestri, N.

    2013-07-01

    The systematic documentation of cultural heritage in Indonesia has been developed after the establishment of Bataviaasch Genootschap van Kunsten en Wetenschappen (1778) and De Oudheidkundige Dienst (1913) by the Netherlands Indies government. After Indonesian independent, the tasks of cultural heritage documentation take over by The Ministry of Culture (now become The Ministry of Education of Culture) with focus on the ancient and classical heritage, so called dead monument. The needed of comprehensive documentation data regarding cultural heritage become significant issues since the government and private sector pay attention to the preservation of heritage building in the urban site, so called living monument. The archives of original drawing plan many times do not fit with the existing condition, while the conservation plan demands a document such as built drawing plan to work on. The technology, methodology and system to provide such comprehensive document of heritage building and site become important, to produce good conservation plan and heritage building regular maintenance. It means the products will have a sustainable and various utility values. Since 1994, Documentation Centre for Architecture - Indonesia (PDA), has established to meet the needs of a comprehensive data of heritage building (living monuments), to utilized as basic document for conservation planning. Not only provide document of the digital drawing such site plan, plan, elevation, section and details of architecture elements, but also document of historic research, material analysis and completed with diagnosis and mapping of building damages. This manuscript is about PDA field experience, working in this subject issue

  12. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    NASA Technical Reports Server (NTRS)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  13. Research and Technology Operating Plan. Summary: Fiscal year 1976 research and technology program

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA was presented. The document is arranged in five sections. The first one contains citations and abstracts of the RTOP. This is followed by four indexes: subject, technical monitor, responsible NASA organization, and RTOP number.

  14. Implementation of the EU Noise Directive in Process of Urban Planning in Poland

    NASA Astrophysics Data System (ADS)

    Kwiecień, J.; Szopińska, K.

    2013-05-01

    In Poland spatial planning policies are described by a system of planning documents controlled by act of Spatial Planning and Land Development of 27 March 2003. Sustainable development principle and spatial order form is the basis of spatial planning efforts. In the territory of Poland the manner of urban space management is defined by a planning document called Local Land Use Plan (LLUP). In a LLUP some issues are arranged, such as the purpose of a given area, location of public purpose investments, land development conditions. When analysing the development process of Polish cities, an obvious conclusion emerges about the lack of complex studies and researches of the environment concerning the issue of acoustic climate. The procedures of development of an LLUP involve merely a general diagnosis of an environment excluding measured values of pollution, including noise levels. The main aim of this article is to introduce the influence of acoustic climate on the urban space planning in Poland through the implementation of the provisions of Directive 2002/49/WE of the European Parliament and the Council of Europe from 25 June 2002. Moreover, in the stages of an LLUP implementations have been suggested the use of a Strategic Noise Map, being a tool for assisting the process of environmental noise level assessment in Poland.

  15. Waste receiving and processing plant control system; system design description

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LANE, M.P.

    1999-02-24

    The Plant Control System (PCS) is a heterogeneous computer system composed of numerous sub-systems. The PCS represents every major computer system that is used to support operation of the Waste Receiving and Processing (WRAP) facility. This document, the System Design Description (PCS SDD), includes several chapters and appendices. Each chapter is devoted to a separate PCS sub-system. Typically, each chapter includes an overview description of the system, a list of associated documents related to operation of that system, and a detailed description of relevant system features. Each appendice provides configuration information for selected PCS sub-systems. The appendices are designed asmore » separate sections to assist in maintaining this document due to frequent changes in system configurations. This document is intended to serve as the primary reference for configuration of PCS computer systems. The use of this document is further described in the WRAP System Configuration Management Plan, WMH-350, Section 4.1.« less

  16. Motivational aftercare planning to better care: Applying the principles of advanced directives and motivational interviewing to discharge planning for people with mental illness.

    PubMed

    Kisely, Steve; Wyder, Marianne; Dietrich, Josie; Robinson, Gail; Siskind, Dan; Crompton, David

    2017-02-01

    Improving the input of people with mental illness into their recovery plans can potentially lead to better outcomes. In the present study, we evaluated the introduction of motivational aftercare planning (MAP) into the discharge planning of psychiatric inpatients. MAP is a manualized intervention combining motivational interviewing with advance directives. We measured changes in the level of patient input into discharge planning following training staff in the use of MAP. This included the following: (i) documentation of early relapse signs along with successful past responses; (ii) evidence of aftercare planning; and (iii) the use of the patients' own words in the plan. We used a ward-level controlled before-and-after design comparing one intervention ward with two control wards. We used anonymized recovery plans, with a goal of 50 plans per ward before and after the intervention, to look for evidence of patient input into care planning with a standardized checklist. There were also qualitative interviews with individuals discharged from the unit. We reviewed 100 intervention ward plans and 197 control ones (total n = 297). There were no significant differences in recovery plans from intervention and control wards at baseline. Following MAP training, the intervention ward improved significantly (e.g. identification of triggers increased from 52 to 94%, χ 2  = 23.3, d.f. =1, P < 0.001). This did not occur in the control wards. The qualitative data (n = 20 interviews) showed improvements in participants' experiences of discharge planning. MAP increased inpatient input into discharge planning and was valued by participants. The effect on subsequent health service use needs evaluation. © 2016 Australian College of Mental Health Nurses Inc.

  17. Interim rules for amending ERISA disclosure requirements for group health plans; approval of information collection requirements--DoL. Interim rules; approval of information collection requirements.

    PubMed

    1997-07-07

    On April 8, 1997, the Department of Labor published interim final rules governing disclosure requirements for private sector group health plans (62 FR 16979). The rules implemented changes to made to certain provisions of the Employee Retirement Income Security Act of 1974 (ERISA), enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). In the April 8 publication, the Department submitted its revision of the currently approved collection regarding Summary Plan Description requirements under ERISA to the Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1965 (PRA 95). This document amends the April 8 Federal Register document to properly display the OMB control number, 1210-0039.

  18. Does implementation matter if comprehension is lacking? A qualitative investigation into perceptions of advance care planning in people with cancer.

    PubMed

    Ugalde, Anna; O'Callaghan, Clare; Byard, Clem; Brean, Samantha; MacKay, Jenelle; Boltong, Anna; Davoren, Sondra; Lawson, Deborah; Parente, Phillip; Michael, Natasha; Livingston, Patricia

    2018-05-11

    While advance care planning holds promise, uptake is variable and it is unclear how well people engage with or comprehend advance care planning. The objective of this study was to explore how people with cancer comprehended advance care plans and examine how accurately advance care planning documentation represented patient wishes. This study used a qualitative descriptive design. Data collection comprised interviews and an examination of participants' existing advance care planning documentation. Participants included those who had any diagnosis of cancer with an advance care plan recorded: Refusal of Treatment Certificate, Statement of Choices, and/or Enduring Power of Attorney (Medical Treatment) at one cancer treatment centre. Fourteen participants were involved in the study. Twelve participants were female (86%). The mean age was 77 (range: 61-91), and participants had completed their advance care planning documentation between 8 and 72 weeks prior to the interview (mean 33 weeks). Three themes were evident from the data: incomplete advance care planning understanding and confidence, limited congruence for attitude and documentation, advance care planning can enable peace of mind. Complete advance care planning understanding was unusual; most participants demonstrated partial comprehension of their own advance care plan, and some indicated very limited understanding. Participants' attitudes and their written document congruence were limited, but advance care planning was seen as helpful. This study highlighted advance care planning was not a completely accurate representation of patient wishes. There is opportunity to improve how patients comprehend their own advance care planning documentation.

  19. 20 CFR 669.660 - What planning documents and information are required in the application for MSFW youth grants and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents and information are... PROGRAM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT The MSFW Youth Program § 669.660 What planning...? The required planning documents and other required information and the submission dates for filing are...

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  1. Intelligent Software for System Design and Documentation

    NASA Technical Reports Server (NTRS)

    2002-01-01

    In an effort to develop a real-time, on-line database system that tracks documentation changes in NASA's propulsion test facilities, engineers at Stennis Space Center teamed with ECT International of Brookfield, WI, through the NASA Dual-Use Development Program to create the External Data Program and Hyperlink Add-on Modules for the promis*e software. Promis*e is ECT's top-of-the-line intelligent software for control system design and documentation. With promis*e the user can make use of the automated design process to quickly generate control system schematics, panel layouts, bills of material, wire lists, terminal plans and more. NASA and its testing contractors currently use promis*e to create the drawings and schematics at the E2 Cell 2 test stand located at Stennis Space Center.

  2. 20 CFR 668.720 - What information must these planning documents contain?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What information must these planning... 166 Planning/Funding Process § 668.720 What information must these planning documents contain? (a) The... planning instructions issued by the Department, the comprehensive services plan must describe in narrative...

  3. Planning: supporting and optimizing clinical guidelines execution.

    PubMed

    Anselma, Luca; Montani, Stefania

    2008-01-01

    A crucial feature of computerized clinical guidelines (CGs) lies in the fact that they may be used not only as conventional documents (as if they were just free text) describing general procedures that users have to follow. In fact, thanks to a description of their actions and control flow in some semiformal representation language, CGs can also take advantage of Computer Science methods and Information Technology infrastructures and techniques, to become executable documents, in the sense that they may support clinical decision making and clinical procedures execution. In order to reach this goal, some advanced planning techniques, originally developed within the Artificial Intelligence (AI) community, may be (at least partially) resorted too, after a proper adaptation to the specific CG needs has been carried out.

  4. Software engineering for ESO's VLT project

    NASA Astrophysics Data System (ADS)

    Filippi, G.

    1994-12-01

    This paper reports on the experience at the European Southern Observatory on the application of software engineering techniques to a 200 man-year control software project for the Very Large Telescope (VLT). This shall provide astronomers, before the end of the century, with one of the most powerful telescopes in the world. From the definition of the general model, described in the software management plan, specific activities have been and will be defined: standards for documents and for code development, design approach using a CASE tool, the process of reviewing both documentation and code, quality assurance, test strategy, etc. The initial choices, the current implementation and the future planned activities are presented and, where feedback is already available, pros and cons are discussed.

  5. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less

  6. MODIS information, data and control system (MIDACS) operations concepts

    NASA Technical Reports Server (NTRS)

    Han, D.; Salomonson, V.; Ormsby, J.; Ardanuy, P.; Mckay, A.; Hoyt, D.; Jaffin, S.; Vallette, B.; Sharts, B.; Folta, D.

    1988-01-01

    The MODIS Information, Data, and Control System (MIDACS) Operations Concepts Document provides a basis for the mutual understanding between the users and the designers of the MIDACS, including the requirements, operating environment, external interfaces, and development plan. In defining the concepts and scope of the system, how the MIDACS will operate as an element of the Earth Observing System (EOS) within the EosDIS environment is described. This version follows an earlier release of a preliminary draft version. The individual operations concepts for planning and scheduling, control and monitoring, data acquisition and processing, calibration and validation, data archive and distribution, and user access do not yet fully represent the requirements of the data system needed to achieve the scientific objectives of the MODIS instruments and science teams. The teams are not yet formed; however, it is possible to develop the operations concepts based on the present concept of EosDIS, the level 1 and level 2 Functional Requirements Documents, and through interviews and meetings with key members of the scientific community. The operations concepts were exercised through the application of representative scenarios.

  7. 26 CFR 301.6104(a)-3 - Public inspection of Internal Revenue Service letters and documents relating to pension and other...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... letters and documents relating to pension and other plans. 301.6104(a)-3 Section 301.6104(a)-3 Internal... of Internal Revenue Service letters and documents relating to pension and other plans. (a) In general... qualification of a pension, profit-sharing or stock bonus plan under section 401(a), an annuity plan under...

  8. Implementation of green infrastructure concept in Citarum Watershed

    NASA Astrophysics Data System (ADS)

    Maryati, Sri; Humaira, An Nisaa'Siti

    2017-03-01

    Green infrastructure has several benefits compared to grey infrastructure in term of environmental services and sustainability, such as reducing energy consumption, improving air quality, providing carbon sequestration, and increasing property values. Nevertheless in practice, the implementation of the concept in Indonesia is still limited. Implementation of the certain concept has to be guided in planning document. In this paper, green infrastructure concept in the current spatial plan and other planning documents is assessed. The purpose of this research is to figure out how far the green infrastructure concept is integrated into planning system, based on the analysis of planning documents in Citarum Watershed and expert interviews with local stakeholders. Content analysis method is used to analyze the documents and result of interview. The result shows that green infrastructure concept has not been accommodated in spatial plan or other planning documents widely. There are some challenges in implementing the concept including reward and punishment system (incentive and disincentive), coordination, and lack of human resources.

  9. 78 FR 40745 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    .... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR part 95, subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 Estimated...

  10. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    ERIC Educational Resources Information Center

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  11. 40 CFR 60.2095 - What site-specific documentation is required?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (5) Procedures for operating the incinerator and associated air pollution control systems within the... incinerator operating limits. (7) Reporting and recordkeeping procedures. (8) The waste management plan... required? 60.2095 Section 60.2095 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  12. 10 CFR 95.39 - External transmission of documents and material.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Procedures Plan for the protection of classified information. (e) Security of classified information in... Section 95.39 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FACILITY SECURITY CLEARANCE AND SAFEGUARDING OF NATIONAL SECURITY INFORMATION AND RESTRICTED DATA Control of Information § 95.39 External...

  13. 10 CFR 95.39 - External transmission of documents and material.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Procedures Plan for the protection of classified information. (e) Security of classified information in... Section 95.39 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FACILITY SECURITY CLEARANCE AND SAFEGUARDING OF NATIONAL SECURITY INFORMATION AND RESTRICTED DATA Control of Information § 95.39 External...

  14. 10 CFR 95.39 - External transmission of documents and material.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Procedures Plan for the protection of classified information. (e) Security of classified information in... Section 95.39 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FACILITY SECURITY CLEARANCE AND SAFEGUARDING OF NATIONAL SECURITY INFORMATION AND RESTRICTED DATA Control of Information § 95.39 External...

  15. 10 CFR 95.39 - External transmission of documents and material.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Procedures Plan for the protection of classified information. (e) Security of classified information in... Section 95.39 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FACILITY SECURITY CLEARANCE AND SAFEGUARDING OF NATIONAL SECURITY INFORMATION AND RESTRICTED DATA Control of Information § 95.39 External...

  16. 10 CFR 95.39 - External transmission of documents and material.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures Plan for the protection of classified information. (e) Security of classified information in... Section 95.39 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FACILITY SECURITY CLEARANCE AND SAFEGUARDING OF NATIONAL SECURITY INFORMATION AND RESTRICTED DATA Control of Information § 95.39 External...

  17. Development and Exchange of Instructional Resources in Water Quality Control Programs, IV: Selecting Instructional Media and Instructional Systems.

    ERIC Educational Resources Information Center

    Durham, W. Harry; And Others

    This document is one of a series of reports which reviews instructional materials and equipment for water and wastewater treatment plant personnel. A system is presented to assist in standardizing the production of lesson plans and instructional materials in the water quality control field. A procedure for selecting appropriate instructional media…

  18. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  19. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  20. Corridor Planning And Feasibility Analysis Corridor, Master Plan

    DOT National Transportation Integrated Search

    1996-04-01

    THE I-70 RURAL IVHS CORRIDOR MASTER PLAN IS THE GUIDANCE DOCUMENT FOR DEPLOYMENT OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS) FOR THE INTERSTATE-70 CORRIDOR FROM DENVER TO GLENWOOD SPRINGS, COLORADO. AS A WORKING DOCUMENT, THE PLAN RECOMMENDS STRAT...

  1. A practical guide on DTA model applications for regional planning

    DOT National Transportation Integrated Search

    2016-06-07

    This document is intended as a guide for use by Metropolitan Planning Organizations (MPO) and other planning agencies that are interested in applying Dynamic Traffic Assignment (DTA) models for planning applications. The objective of this document is...

  2. 78 FR 37819 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    .... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR Part 95, Subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 [[Page 37820...

  3. 30 CFR 254.4 - May I reference other documents in my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I reference other documents in my response plan? 254.4 Section 254.4 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR... May I reference other documents in my response plan? You may reference information contained in other...

  4. NOAA Office of Exploration and Research > About OER > Strategic Plan

    Science.gov Websites

    Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Media News Room OER Symposium Overview Organization Guiding Documents Organizational Structure Map of Strategic Plan Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff

  5. 45 CFR 1355.54 - Submittal of advance planning documents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... § 1355.54 Submittal of advance planning documents. The State title IV-E agency must submit an APD for a...

  6. Onboard Short Term Plan Viewer

    NASA Technical Reports Server (NTRS)

    Hall, Tim; LeBlanc, Troy; Ulman, Brian; McDonald, Aaron; Gramm, Paul; Chang, Li-Min; Keerthi, Suman; Kivlovitz, Dov; Hadlock, Jason

    2011-01-01

    Onboard Short Term Plan Viewer (OSTPV) is a computer program for electronic display of mission plans and timelines, both aboard the International Space Station (ISS) and in ISS ground control stations located in several countries. OSTPV was specifically designed both (1) for use within the limited ISS computing environment and (2) to be compatible with computers used in ground control stations. OSTPV supplants a prior system in which, aboard the ISS, timelines were printed on paper and incorporated into files that also contained other paper documents. Hence, the introduction of OSTPV has both reduced the consumption of resources and saved time in updating plans and timelines. OSTPV accepts, as input, the mission timeline output of a legacy, print-oriented, UNIX-based program called "Consolidated Planning System" and converts the timeline information for display in an interactive, dynamic, Windows Web-based graphical user interface that is used by both the ISS crew and ground control teams in real time. OSTPV enables the ISS crew to electronically indicate execution of timeline steps, launch electronic procedures, and efficiently report to ground control teams on the statuses of ISS activities, all by use of laptop computers aboard the ISS.

  7. Clean, Safe Water. For How Long?

    ERIC Educational Resources Information Center

    Zenke, Pam

    The document presents research and project-oriented activities at the secondary school level for studying Illinois' streams, water pollution, and methods for controlling pollution. Social, economic, and political issues are examined as part of the planning for pollution prevention. Following six teaching objectives, background information traces…

  8. Alcohol control in Virginia : planning documents for use by agencies of the Commonwealth.

    DOT National Transportation Integrated Search

    1982-01-01

    The Governor's Task Force to Combat Drunk Driving was created to confront the problem of drunken driving in Virginia, and to ascertain Virginia's current efforts to address this problem so that these efforts could be assessed and appropriate changes ...

  9. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  10. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  11. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  12. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  13. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  14. Plan-provider integration, premiums, and quality in the Medicare Advantage market.

    PubMed

    Frakt, Austin B; Pizer, Steven D; Feldman, Roger

    2013-12-01

    To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.

  15. Interservice Procedures for Instructional Systems Development. Phase 4 and 5. Implement and Control

    DTIC Science & Technology

    1975-08-01

    FIGUREIZ.2: Flowchart ot Block]Z.1: IMPLEMENT INSTRUCTIONAL MANAGEMENT PLAN BLOCK IV.2: CONDUCT INSTRUCTION LEA Oa.lNUt kaP INSTRUCTIONAL INIIANAI EL...DOCUMENTATION 2.1 [ BTAIN REQUIRED _ _ I 2.J2 CONDUCT INSTRUCTION 1 1 AND DOCUMENT OBSERVATIONS 2.3 ACTIVITIES 2.4 I BLOCK FIGURE ]V.3: Flowchart of...not have the entry skills. The entry skills determi- nation is important to know whether to place the students at the beginn - ing or provide

  16. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  17. Quality Control Review of the Defense Contract Management Agency Internal Review Audit Function

    DTIC Science & Technology

    2013-04-18

    DMI-2011-001, “Audit of DCMA Telework Program,” November 29, 2011, we identified issues with independence. For the Audit of DCMA Telework Program...and Audit of DCMA Telework Program, we identified issues with audit planning. Specifically, we found that both audits did not include documentation...of fraud risks had been performed during audit planning. For the audit of the DCMA Telework Program, steps were added to the audit program to

  18. Advance Care Planning in an Accountable Care Organization Is Associated with Increased Advanced Directive Documentation and Decreased Costs

    PubMed Central

    Kim, Minchul; Franciskovich, Chris M.; Weinberg, Jason E.; Svendsen, Jessica D.; Fehr, Linda S.; Funk, Amy; Sawicki, Robert; Asche, Carl V.

    2018-01-01

    Abstract Background: Advance care planning (ACP) documents patient wishes and increases awareness of palliative care options. Objective: To study the association of outpatient ACP with advanced directive documentation, utilization, and costs of care. Design: This was a case–control study of cases with ACP who died matched 1:1 with controls. We used 12 months of data pre-ACP/prematch and predeath. We compared rates of documentation with logit model regression and conducted a difference-in-difference analysis using generalized linear models for utilization and costs. Setting/subjects: Medicare beneficiaries attributed to a large rural-suburban-small metro multisite accountable care organization from January 2013 to April 2016, with cross reference to ACP facilitator logs to find cases. Measurements: The presence of advance directive forms was verified by chart review. Cost analysis included all utilization and costs billed to Medicare. Results: We matched 325 cases and 325 controls (51.1% female and 48.9% male, mean age 81). 320/325 (98.5%) ACP versus 243/325 (74.8%) of controls had a Healthcare Power of Attorney (odds ratio [OR] 21.6, 95% CI 8.6–54.1) and 172/325(52.9%) ACP versus 145/325 (44.6%) controls had Practitioner Orders for Life Sustaining Treatment (OR 1.40, 95% CI 1.02–1.90) post-ACP/postmatch. Adjusted results showed ACP cases had fewer inpatient admissions (−0.37 admissions, 95% CI −0.66 to −0.08), and inpatient days (−3.66 days, 95% CI −6.23 to −1.09), with no differences in hospice, hospice days, skilled nursing facility use, home health use, 30-day readmissions, or emergency department visits. Adjusted costs were $9,500 lower in the ACP group (95% CI −$16,207 to −$2,793). Conclusions: ACP increases documentation and was associated with a reduction in overall costs driven primarily by a reduction in inpatient utilization. Our data set was limited by small numbers of minorities and cancer patients. PMID:29206564

  19. High-Explosives Applications Facility (HEAF)

    NASA Astrophysics Data System (ADS)

    Morse, J. L.; Weingart, R. C.

    1989-03-01

    This Safety Analysis Report (SAR) reviews the safety and environmental aspects of the High Explosives Applications Facility (HEAF). Topics covered include the site selected for the HEAF, safety design criteria, operations planned within the facility, and the safety and environmental analyses performed on this project to date. Provided in the Summary section is a review of hazards and the analyses, conclusions, and operating limits developed in this SAR. Appendices provide supporting documents relating to this SAR. This SAR is required by the LLNL Health and Safety Manual and DOE Order 5481.1B(2) to document the safety analysis efforts. The SAR was assembled by the Hazards Control Department, B-Division, and HEAF project personnel. This document was reviewed by B Division, the Chemistry Department, the Hazards Control Department, the Laboratory Associate Director for Administration and Operations, and the Associate Directors ultimately responsible for HEAF operations.

  20. 42 CFR 137.361 - Does the Secretary have any other opportunities to approve planning or design documents prepared...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...

  1. Nuisance Wildlife Education and Prevention Plan for the Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giffen, Neil R

    This document outlines a plan for management of nuisance wildlife at the Oak Ridge National Laboratory (ORNL). Nuisance wildlife management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; and law enforcement. This plan covers the following subjects: (1) roles and responsibilities of individuals, groups, and agencies; (2) the general protocol for reducing nuisance wildlife problems; and (3) species-specific methodologies for resolving nuisance wildlife management issues for mammals, birds, snakes, and insects. Achievement of the objectives of this plan will be a joint effort between the Tennessee Wildlife Resources Agency (TWRA); U. S. Department ofmore » Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS)-Wildlife Services (WS); and ORNL through agreements between TWRA and the U.S. Department of Energy (DOE); DOE and UT-Battelle, LLC; and UT-Battelle, LLC; and USDA, APHIS-WS.« less

  2. SWiFT Software Quality Assurance Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, Jonathan Charles

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  3. Legislative Framework for Landscape Planning in Latvia

    NASA Astrophysics Data System (ADS)

    Nitavska, Natalija; Zigmunde, Daiga

    2017-10-01

    With the adoption and the ratification of the European Landscape Convention a legally justified need for a clear landscape policy was grounded in the European countries. It includes the elaboration of the new and the improvement of the existing legislative documents on landscape planning, protection and management. The aim of the particular study is to analyse the existing legislative documents in Latvia influencing landscape planning on different scales / and the implementation of the European Landscape Convention. The study emphasizes the complex structure of the Latvian legislative framework affected by the distribution of the normative documents under the various ministries. Therefore, the main problem is unclear responsibility levels and organizational system for solving the issues regarding landscape planning, protection and management. Thus the various discussions between the involved disciplines and responsible institutions are arising. Two groups of the legislative documents influencing the implementation of the landscape policy in Latvia are detected within the study. The first group is strategic documents determining main landscape planning principles and directions at European, national, regional and professional or sectoral level. The second group is operational documents providing a set of actions for the landscape planning, protection and management at the local or the municipality level. The study concludes that operational documents developed by the municipalities are in high importance because of their direct influence on the landscape planning in Latvia. This often leads to the different landscape planning requirements included in the normative documents of the neighbouring municipalities, although the spatial and ecological borders of the visual landscape do not fit with the formal borders of the municipalities. Thus, it is essential to develop the common principles and actions that would be incumbent on all municipalities to provide the landscape integrity and to protect its values according to the main principles defined in the European Landscape Convention.

  4. TQM (Total Quality Management) SPARC (Special Process Action Review Committees) Handbook

    DTIC Science & Technology

    1989-08-01

    This document describes the techniques used to support and guide the Special Process Action Review Committees for accomplishing their goals for Total Quality Management (TQM). It includes concepts and definitions, checklists, sample formats, and assessment criteria. Keywords: Continuous process improvement; Logistics information; Process analysis; Quality control; Quality assurance; Total Quality Management ; Statistical processes; Management Planning and control; Management training; Management information systems.

  5. Northwest Forest Plan research synthesis.

    Treesearch

    Richard W. Haynes; Gloria E. Perez; [tech. eds.].

    2000-01-01

    This document synthesizes research accomplishments initiated and funded under the Northwest Forest Plan or the President’s Forest Plan (hereafter referred to as the Forest Plan) since its inception in 1994. Three major parts in this document cover, the context for this effort, eight Forest Plan research accomplishments, and a synthesis. The eight accomplishments...

  6. Mild traumatic brain injury: a midwest survey about the assessment and documentation practices of emergency department nurses.

    PubMed

    Bay, Esther

    2011-01-01

    Research reported that mild traumatic brain injury (MTBI), the most common neurological condition in the world, is often undetected in the emergency department. Failure to properly detect and offer treatment therapies has been linked to chronic complications such as, mood disorders and postconcussion syndrome. This descriptive study used a tailored survey (25.0% response rate) to determine emergency department nurses' practices for the assessment and documentation of persons with MTBI. The primary purpose was to determine the extent to which these practices were aligned with the Centers for Disease Control and Prevention guidelines contained within the Acute Concussion Evaluation care plan. Results indicated that physical and cognitive symptoms were assessed and documented more than emotional or sleep symptoms. Still, some cognitive and physical symptoms were rarely assessed or documented. Focus seemed to be on ruling out more severe brain injury versus detection of a mild brain injury. Aligning the systematic assessment and documentation of persons with suspected concussion MTBI with recommendations from the Centers for Disease Control and Prevention is suggested.

  7. Solid waste information and tracking system client-server conversion project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    May, D.L.

    1998-04-15

    This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion.more » It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.« less

  8. Quality control system preparation for photogrammetric and laser scanning missions of Spanish national plan of aerial orthophotogpaphy (PNOA). (Polish Title: Opracowanie systemu kontroli jakości realizacji nalotów fotogrametrycznych i skaningowych dla hiszpańskiego narodowego planu ortofotomapy lotniczej (PNOA))

    NASA Astrophysics Data System (ADS)

    Rzonca, A.

    2013-12-01

    The paper presents the state of the art of quality control of photogrammetric and laser scanning data captured by airborne sensors. The described subject is very important for photogrammetric and LiDAR project execution, because the data quality a prior decides about the final product quality. On the other hand, precise and effective quality control process allows to execute the missions without wide margin of safety, especially in case of the mountain areas projects. For introduction, the author presents theoretical background of the quality control, basing on his own experience, instructions and technical documentation. He describes several variants of organization solutions. Basically, there are two main approaches: quality control of the captured data and the control of discrepancies of the flight plan and its results of its execution. Both of them are able to use test of control and analysis of the data. The test is an automatic algorithm controlling the data and generating the control report. Analysis is a less complicated process, that is based on documentation, data and metadata manual check. The example of quality control system for large area project was presented. The project is being realized periodically for the territory of all Spain and named National Plan of Aerial Orthophotography (Plan Nacional de Ortofotografía Aérea, PNOA). The system of the internal control guarantees its results soon after the flight and informs the flight team of the company. It allows to correct all the errors shortly after the flight and it might stop transferring the data to another team or company, for further data processing. The described system of data quality control contains geometrical and radiometrical control of photogrammetric data and geometrical control of LiDAR data. According to all specified parameters, it checks all of them and generates the reports. They are very helpful in case of some errors or low quality data. The paper includes the author experience in the field of data quality control, presents the conclusions and suggestions of the organization and technical aspects, with a short definition of the necessary control software.

  9. Strategic planning in hospitals in two Australian states: an exploratory study of its practice using planning documentation.

    PubMed

    Jayasuriya, R; Sim, A B

    1998-01-01

    Hospitals are under pressure to respond to new challenges and competition. Many hospitals have used strategic planning to respond to these environmental changes. This exploratory study examines the extent of strategic planning in hospitals in two Australian States, New South Wales and Victoria, using a sample survey. Based on planning documentation, the study indicated that 47% of the hospitals surveyed did not have a strategic or business plan. A significant difference was found in the comprehensiveness of the plans between the two States. Plans from Victorian hospitals had more documented evidence of external/internal analysis, competitor orientation and customer orientation compared with plans from New South Wales hospitals. The paper discusses the limitations of the study and directions for future research.

  10. Genesis Contingency Planning and Mishap Recovery: The Sample Curation View

    NASA Technical Reports Server (NTRS)

    Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.

    2007-01-01

    Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range to control the environment for processing the sample return capsule and cleanly installing a nitrogen purge to the canister, was used to control the environment for extracting collector fragments from the damaged canister and to document and package over 10,000 collector fragments.

  11. Development and evaluation of an aged care specific Advance Care Plan.

    PubMed

    Silvester, William; Parslow, Ruth A; Lewis, Virginia J; Fullam, Rachael S; Sjanta, Rebekah; Jackson, Lynne; White, Vanessa; Hudson, Rosalie

    2013-06-01

    To report on the quality of advance care planning (ACP) documents in use in residential aged care facilities (RACF) in areas of Victoria Australia prior to a systematic intervention; to report on the development and performance of an aged care specific Advance Care Plan template used during the intervention. An audit of the quality of pre-existing documentation used to record resident treatment preferences and end-of-life wishes at participating RACFs; development and pilot of an aged care specific Advance Care Plan template; an audit of the completeness and quality of Advance Care Plans completed on the new template during a systematic ACP intervention. 19 selected RACFs (managed by 12 aged care organisations) in metropolitan and regional areas of Victoria. Documentation in use at facilities prior to the ACP intervention most commonly recorded preferences regarding hospital transfer, life prolonging treatment and personal/cultural/religious wishes. However, 7 of 12 document sets failed to adequately and clearly specify the resident's preferences as regards life prolonging medical treatment. The newly developed aged care specific Advance Care Plan template was met with approval by participating RACFs. Of 203 Advance Care Plans completed on the template throughout the project period, 49% included the appointment of a Medical Enduring Power of Attorney. Requests concerning medical treatment were specified in almost all completed documents (97%), with 73% nominating the option of refusal of life-prolonging treatment. Over 90% of plans included information concerning residents' values and beliefs, and future health situations that the resident would find to be unacceptable were specified in 78% of completed plans. Standardised procedures and documentation are needed to improve the quality of processes, documents and outcomes of ACP in the residential aged care sector.

  12. End-of-life care of oncology inpatients: Are we getting it right?

    PubMed

    Batten, Monique; Nguyen, Bella; Burke, Brandon; Harryanto, Hilman; Mitchell, Imogen; Davis, Alison

    2018-06-13

    To examine the current patterns of end-of-life care of medical oncology patients dying in an Australian tertiary acute hospital setting in order to determine potential areas for improvement. A retrospective observational study was undertaken of 295 consecutive adult medical oncology inpatients dying between 2010 and 2015. Charts were reviewed for evidence of (1) resuscitation plans, (2) acute interventions in the 48-h period prior to death, (3) palliative care involvement and (4) recognition of the dying patient and comfort care plans. At the time of death, 98% of patients had a resuscitation plan, 71% of which were completed by the medical oncology team. Fifty-nine percent of medical emergency team reviews occurred in patients without a documented resuscitation plan. Within 48 h of death, active interventions were still being given to 64% of patients in the total patient population. Comfort care plans were documented in 86% of patients; however, 62% of these were only documented within 48 h of death and 20% of patients with a documented comfort care plan still received noncomfort measures. There was a high level of documented resuscitation plans, comfort care plans and recognition of dying. However, active interventions were common within 48 h of death, and comfort care plans and recognition of dying often occurred late. These data indicate a gap between documenting a resuscitation plan and providing timely and appropriate end-of-life care. Understanding the gaps in delivering appropriate care provides an opportunity for improving end-of-life care. © 2018 John Wiley & Sons Australia, Ltd.

  13. 23 CFR 420.111 - What are the documentation requirements for use of FHWA planning and research funds?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Research Funds § 420.111 What are the documentation requirements for use of FHWA planning and... 23 Highways 1 2010-04-01 2010-04-01 false What are the documentation requirements for use of FHWA planning and research funds? 420.111 Section 420.111 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF...

  14. 25 CFR 1000.69 - How can a Tribe/Consortium obtain comments or selection documents received or utilized after OSG...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA... documents received or utilized after OSG has made a decision on a planning grant application? 1000.69... selection documents received or utilized after OSG has made a decision on a planning grant application? A...

  15. First-of-A-Kind Control Room Modernization Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Kenneth David

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less

  16. 3 CFR - Unified Command Plan 2011

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 3 The President 1 2012-01-01 2012-01-01 false Unified Command Plan 2011 Presidential Documents Other Presidential Documents Memorandum of April 6, 2011 Unified Command Plan 2011 Memorandum for the... implementation of the revised Unified Command Plan. Consistent with title 10, United States Code, section 161(b...

  17. 75 FR 9334 - Multiemployer Pension Plan Information Made Available on Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ..., strategies) that, if disclosed by the plan, may cause, or increase a reasonable risk of, financial harm to... certain actuarial and financial documents about the plan to participants, beneficiaries, employee... request, shall furnish copies of certain actuarial and financial documents to any plan participant...

  18. NASA Thermal Control Technologies for Robotic Spacecraft

    NASA Technical Reports Server (NTRS)

    Swanson, Theodore D.; Birur, Gajanana C.

    2003-01-01

    Technology development is inevitably a dynamic process in search of an elusive goal. It is never truly clear whether the need for a particular technology drives its development, or the existence of a new capability initiates new applications. Technology development for the thermal control of spacecraft presents an excellent example of this situation. Nevertheless, it is imperative to have a basic plan to help guide and focus such an effort. Although this plan will be a living document that changes with time to reflect technological developments, perceived needs, perceived opportunities, and the ever-changing funding environment, it is still a very useful tool. This presentation summarizes the current efforts at NASA/Goddard and NASA/JPL to develop new thermal control technology for future robotic NASA missions.

  19. Future applications of artificial intelligence to Mission Control Centers

    NASA Technical Reports Server (NTRS)

    Friedland, Peter

    1991-01-01

    Future applications of artificial intelligence to Mission Control Centers are presented in the form of the viewgraphs. The following subject areas are covered: basic objectives of the NASA-wide AI program; inhouse research program; constraint-based scheduling; learning and performance improvement for scheduling; GEMPLAN multi-agent planner; planning, scheduling, and control; Bayesian learning; efficient learning algorithms; ICARUS (an integrated architecture for learning); design knowledge acquisition and retention; computer-integrated documentation; and some speculation on future applications.

  20. Phased Project Planning Guidelines

    NASA Technical Reports Server (NTRS)

    1968-01-01

    NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

  1. The National Drug Control Strategy, 1997.

    ERIC Educational Resources Information Center

    Office of National Drug Control Policy, Washington, DC.

    This federal document offers a comprehensive approach to reduce demand for illegal drugs and decrease their availability. Supported by statistical tables and graphs, the summary is divided into six sections. "The Purpose and Nature of the Strategy" outlines a 10-year plan for drug interdiction and reduction and identifies the elements of…

  2. 78 FR 30385 - Approval of Noise Compatibility Program for Tweed-New Haven Regional Airport

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... use of flight procedures can be implemented within the period covered by the program without... maps, descriptions, and other documentation produced during the noise compatibility planning study... 180 days (other than the use of new flight procedures for noise control). Failure to approve or...

  3. An Analysis of the Navy’s Fiscal Year 2013 Shipbuilding Plan

    DTIC Science & Technology

    2012-07-01

    Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response...penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1 . REPORT DATE JUL 2012 2...4456 ContentsSummary iii Changes in Inventory Goals Under the 2013 Plan 1 Box 1 . The Roles of Major Types of Ships in the Navy’s Battle Force Fleet 2

  4. Guidance documents: Continued support to improve operations of fish hatcheries and field sites to reduce the impact or prevent establishment of New Zealand Mudsnails and other invasive mollusks

    USGS Publications Warehouse

    Moffitt, Christine M.

    2017-01-01

    This project tested and revised a risk assessment/management tool authored by Moffitt and Stockton designed to provide hatchery biologists and others a structure to measure risk and provide tools to control, prevent or eliminate invasive New Zealand mudsnails (NZMS) and other invasive mollusks in fish hatcheries and hatchery operations. The document has two parts: the risk assessment tool, and an appendix that summarizes options for control or management.The framework of the guidance document for risk assessment/hatchery tool combines approaches used by the Hazard Analysis and Critical Control Points (HACCP) process with those developed by the Commission for Environmental Cooperation (CEC), of Canada, Mexico, and the United States, in the Tri-National Risk Assessment Guidelines for Aquatic Alien Invasive Species. The framework approach for this attached first document assesses risk potential with two activities: probability of infestation and consequences of infestation. Each activity is treated equally to determine the risk potential. These two activities are divided into seven basic elements that utilize scientific, technical, and other relevant information in the process of the risk assessment. To determine the probability of infestation four steps are used that have scores reported or determined and averaged. This assessment follows a familiar HACCP process to assess pathways of entry, entry potential, colonization potential, spread potential. The economic, environmental and social consequences are considered as economic impact, environmental impact, and social and cultural influences.To test this document, the Principal Investigator worked to identify interested hatchery managers through contacts at regional aquaculture meetings, fish health meetings, and through the network of invasive species managers and scientists participating in the Western Regional Panel on Aquatic Nuisance Species and the 100th Meridian Initiative's Columbia River Basin Team, and the Western New Zealand Mudsnail Conference in Seattle. Targeted hatchery workshops were conducted with staff at Dworshak National Fish Hatchery Complex (ID), Similkameen Pond, Oroville WA, and Ringold Springs State Hatchery (WA).As a result of communications with hatchery staff, invasive species managers, and on site assessments of hatchery facilities, the document was modified and enhanced. Additional resources were added to keep it up to date. The result is a more simplified tool that can lead hatchery or management personnel through the process of risk assessment and provide an introduction to the risk management and communication process.In addition to the typical HACCP processes, this tool adds steps to rate and consider uncertainty and the weight of evidence regarding options and monitoring results . Uncertainty of outcome exists in most tools that can be used to control or prevent NZMS or other invasive mollusks from infesting an area. In additional this document emphasizes that specific control tools and plans must be tailored to each specific setting to consider the economic, environmental and social influences. From the testing and evaluation process, there was a strong recognition that a number of control and prevention tools previously suggested and reported in the literature from laboratory and small scale trials may not be compatible with regional and national regulations, economic constraints, social or cultural constraints, engineering or water chemistry characteristics of each facility.The options for control are summarized in the second document, Review of Control Measures for Hatcheries Infested with NZMS (Appendix A) that provides sources for additional resources and specific tools, and guidance regarding the feasibility and success of each approach. This tool also emphasizes that management plans need to be adaptive and incorporate oversight from professionals familiar with measuring risks of fish diseases, and treatments (e.g. the fish health practitioners and water quality and effluent management teams). Finally, with such a team, the adaptive management approach must be ongoing, and become a regular component of hatchery operations.Although it was the intent that this two part document would be included as part of the revised National Management and Control Plan for the NZMS proposed by the U.S. Fish and Wildlife Service (USFWS) and others, it is provided as a stand-alone document.

  5. 42 CFR 495.326 - Disallowance of FFP.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., requirements, and other undertakings described in the approved HIT planning advance planning document and HIT implementation advance planning document to the detriment of the proper and efficient operation of the Medicaid program, payment of FFP may be disallowed. In the case of a suspension of approval of a HIT planning...

  6. Connected Vehicle Impacts on Transportation Planning—Outreach to Planning Community.

    DOT National Transportation Integrated Search

    2016-06-01

    This document presents outreach memos on 11 case studies analyzing the impacts of connected and automated vehicles (C/AV) on transportation planning products. These 11 case studies are documented indepth in the associated project document entitled Co...

  7. Promising More Information

    NASA Technical Reports Server (NTRS)

    2003-01-01

    When NASA needed a real-time, online database system capable of tracking documentation changes in its propulsion test facilities, engineers at Stennis Space Center joined with ECT International, of Brookfield, Wisconsin, to create a solution. Through NASA's Dual-Use Program, ECT developed Exdata, a software program that works within the company's existing Promise software. Exdata not only satisfied NASA s requirements, but also expanded ECT s commercial product line. Promise, ECT s primary product, is an intelligent software program with specialized functions for designing and documenting electrical control systems. An addon to AutoCAD software, Promis e generates control system schematics, panel layouts, bills of material, wire lists, and terminal plans. The drawing functions include symbol libraries, macros, and automatic line breaking. Primary Promise customers include manufacturing companies, utilities, and other organizations with complex processes to control.

  8. Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success

    DTIC Science & Technology

    2009-09-01

    comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to

  9. Decoupling the use and meaning of strategic plans in public healthcare

    PubMed Central

    2013-01-01

    Background The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? Methods An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. Results The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. Conclusions The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities. PMID:23289527

  10. Decoupling the use and meaning of strategic plans in public healthcare.

    PubMed

    Lega, Federico; Longo, Francesco; Rotolo, Andrea

    2013-01-04

    The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities.

  11. Utility interconnection issues for wind power generation

    NASA Technical Reports Server (NTRS)

    Herrera, J. I.; Lawler, J. S.; Reddoch, T. W.; Sullivan, R. L.

    1986-01-01

    This document organizes the total range of utility related issues, reviews wind turbine control and dynamic characteristics, identifies the interaction of wind turbines to electric utility systems, and identifies areas for future research. The material is organized at three levels: the wind turbine, its controls and characteristics; connection strategies as dispersed or WPSs; and the composite issue of planning and operating the electric power system with wind generated electricity.

  12. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less

  13. An Inventory of Documents on Educational Planning and Management in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Mellor, Warren L., Ed.

    This document comprises a UNESCO-sponsored inventory of documents on educational planning and management in Asia and the Pacific. The database consists of 714 documents from participating countries, divided into 10 subsections by country and indexed according to author and subject. The main entries are grouped alphabetically by country, as…

  14. The passage and initial implementation of Oregon's Measure 44

    PubMed Central

    Goldman, L.; Glantz, S.

    1999-01-01

    OBJECTIVE—To prepare a history of the passage and early implementation of Ballot Measure 44, "An Act to Support the Oregon Health Plan", and tobacco control policymaking in Oregon. Measure 44 raised cigarette taxes in Oregon by US$0.30 per pack, and dedicated 10% of the revenues to tobacco control.
METHODS—Data were gathered from interviews with members of the Committee to Support the Oregon Health Plan, Measure 44's campaign committee, as well as with state and local officials, and tobacco control advocates. Additional information was obtained from public documents, internal memoranda, and news reports.
RESULTS—Although the tobacco industry outspent Measure 44's supporters 7 to 1, the initiative passed with 56% of the vote. Even before the election, tobacco control advocates were working to develop an implementation plan for the tobacco control programme. They mounted a successful lobbying campaign to see that the legislature did not divert tobacco control funds to other uses. They also stopped industry efforts to limit the scope of the programme. The one shortcoming of the tobacco control forces was not getting involved in planning the initiative early enough to influence the amount of money that was devoted to tobacco control. Although public health groups provided 37% of the money it cost to pass Measure 44, only 10% of revenues were devoted to tobacco control.
CONCLUSIONS—Proactive planning and aggressive implementation can secure passage of tobacco control initiatives and see that the associated implementing legislation follows good public health practice.


Keywords: advocacy; legislation; implementation; tobacco tax PMID:10599577

  15. Santa Barbara City College: 1999-02 College Plan.

    ERIC Educational Resources Information Center

    Santa Barbara City Coll., CA.

    This document presents Santa Barbara City College's 1999-2002 College Plan. It is intended to be used as the central organizing document for decision making, planning, and budgeting throughout the College during the 1999-2002 period. This plan is the result of thoughtful and substantive dialogue involving individuals and groups throughout the…

  16. El Camino College Master Plan.

    ERIC Educational Resources Information Center

    El Camino Coll., Torrance, CA.

    This document is the educational Master Plan for El Camino Community College District. The purpose of the plan is to develop a research-based document that will be used as a foundation for decisions regarding instructional programs, support services, staffing and facilities. It is intended to serve as the basic foundation for all other plans of…

  17. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  18. Thurston Region public transportation system architecture and strategic deployment plan. Technical memorandum #3

    DOT National Transportation Integrated Search

    2001-10-01

    This document is the third in a series of five that present the sequential results of the Thurston Regional Planning Council (TRPC) Regional Intelligent Transportation Systems (ITS) : Planning Project. This document presents an ITS Strategic Depl...

  19. Design requirements for SRB production control system. Volume 3: Package evaluation, modification and hardware

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The software package evaluation was designed to analyze commercially available, field-proven, production control or manufacturing resource planning management technology and software package. The analysis was conducted by comparing SRB production control software requirements and conceptual system design to software package capabilities. The methodology of evaluation and the findings at each stage of evaluation are described. Topics covered include: vendor listing; request for information (RFI) document; RFI response rate and quality; RFI evaluation process; and capabilities versus requirements.

  20. Automation and Intensity Modulated Radiation Therapy for Individualized High-Quality Tangent Breast Treatment Plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Purdie, Thomas G., E-mail: Tom.Purdie@rmp.uhn.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; Techna Institute, University Health Network, Toronto, Ontario

    Purpose: To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Methods and Materials: Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to definemore » and simplify the technical aspects of the treatment planning process. Results: Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Conclusions: Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented improvements in care for breast cancer patients, using technologies that are widely available and already in clinical use.« less

  1. Automation and intensity modulated radiation therapy for individualized high-quality tangent breast treatment plans.

    PubMed

    Purdie, Thomas G; Dinniwell, Robert E; Fyles, Anthony; Sharpe, Michael B

    2014-11-01

    To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to define and simplify the technical aspects of the treatment planning process. Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented improvements in care for breast cancer patients, using technologies that are widely available and already in clinical use. Copyright © 2014 Elsevier Inc. All rights reserved.

  2. Fly-by-light flight control system technology development plan

    NASA Technical Reports Server (NTRS)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  3. Work Package 5: Contingency Management. Mission Planning Requirements Document: Preliminary Version. Revision A

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.

  4. Space station MSFC-DPD-235/DR no. MA-05 phase C/D program development plan. Volume 2: Phase C/D, programmatic requirements

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.

  5. Disease control operations

    USGS Publications Warehouse

    Friend, Milton; Franson, J. Christian

    1987-01-01

    Individual disease outbreaks have killed many thousands of animals on numerous occasions. Tens of thousands of migratory birds have died in single die-offs with as many as 1,000 birds succumbing in 1 day. In mammals, individual disease outbreaks have killed hundreds to thousands of animals with, for example, hemorrhagic disease in white-tailed deer, distemper in raccoon, Errington's disease in muskrat, and sylvatic plague in wild rodents. The ability to successfully combat such explosive situations is highly dependent n the readiness of field personnel to deal with them. Because many disease agents can spread though wildlife populations very fast, advance preparation is essential in preventing infected animals from spreading disease to additional species and locations. Carefully though-out disease contingency plans should be developed as practical working documents for field personnel and updated as necessary. Such well-designed plans can prove invaluable in minimizing wildlife losses and costs associated with disease control activities. Although requirements for disease control operations vary and must be tailored to each situation, all disease contingency planning involved general concepts and basic biological information. This chapter, intended as a practical guide, identifies the major activities and needs of disease control operations, and relates them to disease contingency planning.

  6. National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacGowan, B

    Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less

  7. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  8. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  9. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  10. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  11. Campus HIV Prevention Strategies: Planning for Success.

    ERIC Educational Resources Information Center

    Hoban, Mary T.; Ottenritter, Nan W.; Gascoigne, Jan L.; Kerr, Dianne L.

    This document presents the results of the National College Health Risk Behavior Survey (NCHRBS) conducted by the U.S. Centers for Disease Control (CDC) that pertain to HIV transmission. These results include sexual assault, alcohol and other drug use, and sexual behaviors. The survey was administered to a nationally representative random sample of…

  12. Spent Nuclear Fuel Project Configuration Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reilly, M.A.

    This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.

  13. 78 FR 38872 - Approval and Promulgation of Air Quality Implementation Plans; Idaho Amalgamated Sugar Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... form of encryption, and be free of any defects or viruses. Docket: All documents in the electronic... hard copy form. Publicly available docket materials are available either electronically in www... determination for TASCO's fossil fuel-fired Riley Boiler. This alternative control measure is also referred to...

  14. Interface Control Document for the Traffic Lights and Emergency Communications System at Gretna and Governor Nicholls Traffic Light Facilities

    DOT National Transportation Integrated Search

    1997-11-06

    Gretna and Governor Nicholls Light facilities are two manned shore side : facilities mounted in critical areas on the banks of the Mississippi River in : the port of New Orleans, Louisiana. Coast Guard plans call for the lights to : be remotely contr...

  15. 78 FR 31573 - Proposed Information Collection; Comment Request: Social Values of Ecosystem Services at Cape...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... visitors that can be used to prepare resource management planning documents. II. Data OMB Control Number...: We (National Park Service) will ask the Office of Management and Budget (OMB) to approve the... visitor groups and local community members about the values they place on cultural and natural resources...

  16. 78 FR 39736 - Draft Guidance for Industry: Considerations for the Design of Early-Phase Clinical Trials of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ..., choosing a study population, using a control group and blinding, dose selection, treatment plans...] Draft Guidance for Industry: Considerations for the Design of Early-Phase Clinical Trials of Cellular... document entitled ``Guidance for Industry: Considerations for the Design of Early-Phase Clinical Trials of...

  17. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  18. Subgroup analyses in randomised controlled trials: cohort study on trial protocols and journal publications.

    PubMed

    Kasenda, Benjamin; Schandelmaier, Stefan; Sun, Xin; von Elm, Erik; You, John; Blümle, Anette; Tomonaga, Yuki; Saccilotto, Ramon; Amstutz, Alain; Bengough, Theresa; Meerpohl, Joerg J; Stegert, Mihaela; Olu, Kelechi K; Tikkinen, Kari A O; Neumann, Ignacio; Carrasco-Labra, Alonso; Faulhaber, Markus; Mulla, Sohail M; Mertz, Dominik; Akl, Elie A; Bassler, Dirk; Busse, Jason W; Ferreira-González, Ignacio; Lamontagne, Francois; Nordmann, Alain; Gloy, Viktoria; Raatz, Heike; Moja, Lorenzo; Rosenthal, Rachel; Ebrahim, Shanil; Vandvik, Per O; Johnston, Bradley C; Walter, Martin A; Burnand, Bernard; Schwenkglenks, Matthias; Hemkens, Lars G; Bucher, Heiner C; Guyatt, Gordon H; Briel, Matthias

    2014-07-16

    To investigate the planning of subgroup analyses in protocols of randomised controlled trials and the agreement with corresponding full journal publications. Cohort of protocols of randomised controlled trial and subsequent full journal publications. Six research ethics committees in Switzerland, Germany, and Canada. 894 protocols of randomised controlled trial involving patients approved by participating research ethics committees between 2000 and 2003 and 515 subsequent full journal publications. Of 894 protocols of randomised controlled trials, 252 (28.2%) included one or more planned subgroup analyses. Of those, 17 (6.7%) provided a clear hypothesis for at least one subgroup analysis, 10 (4.0%) anticipated the direction of a subgroup effect, and 87 (34.5%) planned a statistical test for interaction. Industry sponsored trials more often planned subgroup analyses compared with investigator sponsored trials (195/551 (35.4%) v 57/343 (16.6%), P<0.001). Of 515 identified journal publications, 246 (47.8%) reported at least one subgroup analysis. In 81 (32.9%) of the 246 publications reporting subgroup analyses, authors stated that subgroup analyses were prespecified, but this was not supported by 28 (34.6%) corresponding protocols. In 86 publications, authors claimed a subgroup effect, but only 36 (41.9%) corresponding protocols reported a planned subgroup analysis. Subgroup analyses are insufficiently described in the protocols of randomised controlled trials submitted to research ethics committees, and investigators rarely specify the anticipated direction of subgroup effects. More than one third of statements in publications of randomised controlled trials about subgroup prespecification had no documentation in the corresponding protocols. Definitive judgments regarding credibility of claimed subgroup effects are not possible without access to protocols and analysis plans of randomised controlled trials. © The DISCO study group 2014.

  19. Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jannik, G.T.; Mamatey, A.; Arnett, M.

    1993-10-05

    In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue tomore » analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.« less

  20. An annual employee education calendar as the capstone of educational assessment, planning, and delivery.

    PubMed

    Morton, Paula G

    2005-01-01

    Staff development educators can better control their workload and provide a more comprehensive employee education program when the organization adopts a formal five-step process that culminates in the publication of an annual employee education calendar. This article describes the five steps of organization-wide learning needs assessment, resource allocation, priority setting, documentation of the educational plan, and calendar development, including elements and timelines. The annual calendar reflects involvement of staff throughout the facility in the identification, planning, and delivery of education programs. Its publication enhances staff and supervisors' awareness of learning opportunities. Its longer-range perspective assists managers and employees to better plan to meet learning needs and improves participation in staff development activities.

  1. Creating a University for the 21st Century: Strategic Plan

    ERIC Educational Resources Information Center

    North Dakota University System, 2005

    2005-01-01

    This document presents the strategic plan of the North Dakota University System, revised in November 2005, to develop a common vision and clear set of expectations for higher education in North Dakota. The strategic plan for the University System is directly linked to the Roundtable on Higher Education plan. This document presents the ten sections…

  2. Defense.gov Special Report: Government Shutdown - What You Need to Know

    Science.gov Websites

    Department is taking to plan for a possible government shutdown. Document Plan for Agency Operations During agencies should plan for a potential shutdown. Document Guidance for Continuation of Operations in The Contingency Plan Guidance for Continuation of Essential Operations in the Absence of Available Appropriations

  3. Solid waste information and tracking system server conversion project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  4. Pharmacist care plans and documentation of follow-up before the Iowa Pharmaceutical Case Management program.

    PubMed

    Becker, CoraLynn; Bjornson, Darrel C; Kuhle, Julie W

    2004-01-01

    To document drug therapy problems and their causes and assess pharmacist follow-up of patients with identified drug therapy problems. Cross-sectional analysis. Iowa. 160 pharmacists who submitted 754 pharmaceutical care plans in an effort to qualify for participation in the Iowa Pharmaceutical Case Management program. Care plans were assessed for drug therapy problems and causes and for documentation of pharmacist follow-up (actual, none, or intent to follow up). Pharmacists documented a wide variety of drug therapy problems and causes, including adverse drug reactions (20.1% of care plans), need for additional drug therapy (18.9%), lack of patient adherence to therapy (16.3%), incorrect medication being prescribed (14.1%), and drug dose too high (10.0%). Pharmacist follow-up with patients was not optimal, with 31% of care plans providing documentation of actual follow-up. Another 42.2% of plans indicated that the pharmacist intended to contact the patient for follow-up but either did not do so or did not record the intervention. No actual follow-up or intent to follow up was recorded in 26.8% of care plans. Pharmacists practicing in independent pharmacies followed up with patients more frequently than those in other settings (36.4% of care plans, compared with 22.7%, 23.2%, and 28.4% for chain, clinic, and franchise pharmacies). Pharmacists were more likely to follow up when the identified problem involved drug safety rather than effectiveness (36.2% versus 28.3% of care plans). Documentation of pharmacist follow-up with patients was less than optimal. In addition to identifying drug therapy problems and causes, pharmacists must complete the care continuum through documentation of patient monitoring and follow-up to transform the philosophy and vision of the pharmaceutical care concept into a practice of pharmacy recognized and rewarded by patients and payers.

  5. Restoration Planning: Guidance Document for Natural Resource Damage Assessment Under the Oil Pollution Act of 1990

    DOT National Transportation Integrated Search

    1996-08-01

    The purpose of this document is to provide trustees with general guidance to develop restoration plans under OPA that comply with NEPA's procedural requirements. The focus of this document is to more fully describe the processes and products required...

  6. Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental, LLC

    2009-09-01

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  7. Data management and processing plan, Department of Applied Geodesy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.

  8. Ethics and professional responsibility: Essential dimensions of planned home birth.

    PubMed

    McCullough, Laurence B; Grünebaum, Amos; Arabin, Birgit; Brent, Robert L; Levene, Malcolm I; Chervenak, Frank A

    2016-06-01

    Planned home birth is a paradigmatic case study of the importance of ethics and professionalism in contemporary perinatology. In this article we provide a summary of recent analyses of the Centers for Disease Control database on attendants and birth outcomes in the United States. This summary documents the increased risks of neonatal mortality and morbidity of planned home birth as well as bias in Apgar scoring. We then describe the professional responsibility model of obstetric ethics, which is based on the professional medical ethics of two major figures in the history of medical ethics, Drs. John Gregory of Scotland and Thomas Percival of England. This model emphasizes the identification and careful balancing of the perinatologist's ethical obligations to pregnant, fetal, and neonatal patients. This model stands in sharp contrast to one-dimensional maternal-rights-based reductionist model of obstetric ethics, which is based solely on the pregnant woman's rights. We then identify the implications of the professional responsibility model for the perinatologist's role in directive counseling of women who express an interest in or ask about planned home birth. Perinatologists should explain the evidence of the increased, preventable perinatal risks of planned home birth, recommend against it, and recommend planned hospital birth. Perinatologists have the professional responsibility to create and sustain a strong culture of safety committed to a home-birth-like experience in the hospital. By routinely fulfilling these professional responsibilities perinatologists can help to prevent the documented, increased risks planned home birth. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. Some guidance on preparing validation plans for the DART Full System Models.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy

    2009-03-01

    Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less

  10. Preschool Teachers' Perspectives on Planning and Documentation in Preschool

    ERIC Educational Resources Information Center

    Alvestad, Torgeir; Sheridan, Sonja

    2015-01-01

    This article is based on a research project focusing on Norwegian teachers' planning and documentation of children's learning in preschool. Norwegian preschools follow a national curriculum and teachers are obliged to document both professional practice and learning outcomes. The aim of the article is to investigate teachers' experiences of…

  11. Comment and response document for the long-term surveillance plan for the Bodo Canyon Disposal Site, Durango. Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This document contains comments made by the US Nuclear Regulatory Commission upon their review of the Long-Term Surveillance Plan for the Bodo Canyon Disposal Site, Durango, Colorado. Responses to the comments are also included in the document.

  12. Project management plan for asbestos control at Randolph Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Broers, G.J.

    1988-02-01

    The United States Air Force Air Training Command (ATC) Headquarters requested assistance from the Idaho National Engineering Laboratory (INEL) in February, 1987 to develop processes and procedures and provide program management to minimize and control asbestos hazard at its thirteen bases. This effort was requested by the ATC to comply with Executive Order 12088 under which the USAF is directed to meet all applicable federal, state, and local environmental regulations. In response to that request the efforts identified within this document provide the ATC with a thorough base-wide Asbestos Survey Report, an Asbestos Management Plan and an Operations and Maintenancemore » Plan for Randolph AFB which, when implemented, will comply with current and anticipated federal laws and provide the base with accurate information needed for long range asbestos management. The other twelve bases will be surveyed and sampled in the four years to follow with appropriate asbestos management plans developed for each. 6 figs.« less

  13. Draft Updates to the Planning for Natural Disaster Debris Guidance and to Related Documents

    EPA Pesticide Factsheets

    EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.

  14. 48 CFR 252.211-7001 - Availability of Specifications, Standards, and Data Item Descriptions Not Listed in the...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents. Availability of... Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents. Availability of... Streamlining and Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent...

  15. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    NASA Technical Reports Server (NTRS)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  16. Superfund record of decision (EPA Region 3): Ohio River Park Site, Operable Unit 3, Neville Island, PA, September 17, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    This Record of Decision (ROD) presents the selected remedial action plan for the Ohio River Park Superfund Site (the Site) in Allegheny County, Pennsylvania. The remedial action plan in this document is presented as the permanent remedy for controlling the groundwater at the Site. This remedy is comprised of: monitoring of natural attenuation processes to measure changes in contaminant concentrations in groundwater plume at the Site until the cleanup levels are achieved; deed restriction preventing residential use of groundwater at the Site.

  17. Repository-based software engineering program: Concept document

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.

  18. Cancer Nanotechnology Plan

    Cancer.gov

    The Cancer Nanotechnology Plan serves as a strategic document to the NCI Alliance for Nanotechnology in Cancer as well as a guiding document to the cancer nanotechnology and oncology fields, as a whole.

  19. Developing Your Evaluation Plans: A Critical Component of Public Health Program Infrastructure.

    PubMed

    Lavinghouze, S Rene; Snyder, Kimberly

    A program's infrastructure is often cited as critical to public health success. The Component Model of Infrastructure (CMI) identifies evaluation as essential under the core component of engaged data. An evaluation plan is a written document that describes how to monitor and evaluate a program, as well as how to use evaluation results for program improvement and decision making. The evaluation plan clarifies how to describe what the program did, how it worked, and why outcomes matter. We use the Centers for Disease Control and Prevention's (CDC) "Framework for Program Evaluation in Public Health" as a guide for developing an evaluation plan. Just as using a roadmap facilitates progress on a long journey, a well-written evaluation plan can clarify the direction your evaluation takes and facilitate achievement of the evaluation's objectives.

  20. 78 FR 14556 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... for ACF. OMB No.: 0992-0005. Description: The Advance Planning Document (APD) process, established in... Biennial Reports 54 1 1.50 81 Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning... for the proper performance of the functions of the agency, including whether the information shall...

  1. Missouri Comprehensive Outdoor Recreation Plan: Executive Summary.

    ERIC Educational Resources Information Center

    Missouri State Inter-Agency for Outdoor Recreation, Jefferson.

    The document is a summary of the Missouri State Comprehensive Outdoor Recreation Plan, which was designed to provide guidelines for allocation of resources for needed recreation facilities. The plan identifies the present and future needs for outdoor recreation and recommends ways of meeting these needs. This 1967 document provides a brief history…

  2. 42 CFR 495.324 - Prior approval conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: (1) The HIT advance planning document and the implementation advance planning document. (2) A request... $100,000 or contract time extensions of more than 60 days. (4) The State Medicaid HIT plan. (c) Failure...-competitively from a nongovernmental source HIT equipment or services, with proposed FFP under this subpart if...

  3. Public Comment Period Open for the Draft Update to the Planning for Natural Disaster Debris Guidance and to Related Documents

    EPA Pesticide Factsheets

    EPA is requesting comment on the draft Planning for Natural Disaster Debris Guidance, and two other documents. The Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.

  4. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less

  5. Mod-5A wind turbine generator program design report. Volume 3: Final design and system description, book 2

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The design, development and analysis of the 7.3MW MOD-5A wind turbine generator is documented. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 3, book 2 describes the performance and characteristics of the MOD-5A wind turbine generator in its final configuration. The subsystem for power generation, control, and instrumentation subsystems is described in detail. The manufacturing and construction plans, and the preparation of a potential site on Oahu, Hawaii, are documented. The quality assurance and safety plan, and analyses of failure modes and effects, and reliability, availability and maintainability are presented.

  6. Project Quality Assurance Plan for research and development services provided by Oak Ridge National Laboratory in support of the Westinghouse Materials Company of Ohio Operable Unit 1 Stabilization Development and Treatability Studies Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilliam, T.M.

    1991-05-01

    This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein.more » The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.« less

  7. Space Station Systems Technology Study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The four study areas addressed are: (1) attitude control, (2) data management, (3) long-life thermal management, and (4) automated housekeeping integration. The design concepts in each area were refined. The cost benefits, schedules, and life cycle costs for the options were evaluated. Technology advancement plans were prepared for each of the selected items, and documentation was prepared.

  8. 40 CFR 131.38 - Establishment of numeric criteria for priority toxic pollutants for the State of California.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Great Lakes Water Quality Initiative Criteria Documents for the Protection of Aquatic Life in Ambient... water quality criteria to protect against acute effects in aquatic life and is the highest instream... any aquatic life or human health use classifications in the Water Quality Control Plans for the...

  9. 76 FR 63860 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... the following address: Roberto Morales, OAQPS Document Control Officer (C404-02), U.S. EPA, Research... well as to conduct a clearly defined, time-limited process by which any similarly justified revisions... docket for this rulemaking for a quantitative demonstration of this proposed revision, as well as for the...

  10. 76 FR 54993 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... nitrogen (NO X ) emissions from biomass fuel-fired boilers. We are proposing action on a local rule that... Submitted PCAPCD 233 Biomass Boilers......... 12/10/09 05/07/10 On June 8, 2010, the submittal for PCAPCD... from biomass boilers and steam generators. EPA's technical support document (TSD) has more information...

  11. Space Station Induced Monitoring

    NASA Technical Reports Server (NTRS)

    Spann, James F. (Editor); Torr, Marsha R. (Editor)

    1988-01-01

    This report contains the results of a conference convened May 10-11, 1988, to review plans for monitoring the Space Station induced environment, to recommend primary components of an induced environment monitoring package, and to make recommendations pertaining to suggested modifications of the Space Station External Contamination Control Requirements Document JSC 30426. The contents of this report are divided as Follows: Monitoring Induced Environment - Space Station Work Packages Requirements, Neutral Environment, Photon Emission Environment, Particulate Environment, Surface Deposition/Contamination; and Contamination Control Requirements.

  12. Psychometric Testing of the Self-Efficacy for Interdisciplinary Plans of Care Scale.

    PubMed

    Molle, Elizabeth; Froman, Robin

    2017-01-01

    Computerized interdisciplinary plans of care have revitalized nurse-centric care plans into dynamic and meaningful electronic documents. To maximize the benefits of these documents, it is important to understand healthcare professionals' attitudes, specifically their confidence, for making computerized interdisciplinary care plans useful and meaningful documents. The purpose of the study was to test the psychometric properties of the Self-Efficacy for Interdisciplinary Plans of Care instrument intended to measure healthcare professionals' self-efficacy for using such documents. Content validity was assessed by an expert review panel. Content validity indices ranged from 0.75 to 1.00, with a scale CVI of 0.94. A sample of 389 healthcare providers completed the 14-item instrument. Principal axis factoring was used to assess factor structure. The exploratory factor analysis yielded a single-factor structure accounting for 71.76% of covariance. Cronbach internal consistency coefficient for the single factor solution was .97. The corrected item-total correlations ranged from 0.71 to 0.90. The coefficient of stability, during a 2-week period, with a subset of the sample (n = 38), was estimated at 0.82. The results of this study suggest that the Self-Efficacy for Interdisciplinary Plans of Care has sturdy reliability and validity for measuring the self-efficacy of healthcare providers to make computerized interdisciplinary plans of care meaningful and useful documents.

  13. Practical strategies for developing the business case for hospital glycemic control teams.

    PubMed

    Magee, Michelle F; Beck, Adam

    2008-09-01

    Many business models may be used to make the business case for support of a multidisciplinary team to implement targeted glucose control in the hospital. Models may be hospital-supported or self-supporting. In the former, the hospital provides financial support based on improved documentation opportunities, reduction in length of stay, and improved resource utilization. In the latter, clinical revenues for diabetes management offsets costs of salary, fringe benefits, and overheads. A combination of these strategies may also be used. The business plan presented to administration must justify return on investment. It is imperative to involve hospital administration, particularly representatives from coding, billing, and finance, in the development of the business plan. The business case for hospital support will be based on opportunities related to improving accuracy of documentation and coding for diabetes-related diagnoses, including level of control and complications present, on reduction in length of stay and on optimization of resource utilization through reduction in morbidity and mortality (cost aversion). The case for revenue generation through billing for clinical services will be based on opportunities to increase the provision of glycemic management services in the hospital. Examples from the literature and of analyses to support each of these models are presented. (c) 2008 Society of Hospital Medicine.

  14. [Ethical principles of management and planning during influenza pandemic].

    PubMed

    Kubar', O I; Asatrian, A Zh

    2012-01-01

    The article is dedicated to an actual problem of ethical component inclusion into the system of management and planning of epidemic control measures during threat emergence and in the course of influenza pandemic (epidemic) progress. Data regarding development of international ethical guidelines during influenza including WHO recommendations are presented and analysis of normative documents in Russian Federation is given. A necessity of comprehension and accounting of ethical values in pandemic preparedness is shown, main directions of action and responsibility are revealed. Key ethical positions of planning and implementation of measures during influenza pandemic are outlined, compliance with those determines the level of public support and thus provides the effectiveness of the implemented measures.

  15. Trends in liability affecting technical writers

    NASA Technical Reports Server (NTRS)

    Driskill, L. P.

    1981-01-01

    Liability of technical writers for defective products is explored. Documents generated during a product's life cycle (including design memos, design tests, clinical trials, trial use reports, letters, and proposals) become relevant because they are likely to become the only available means of showing that the product was not defectively designed. These documents become the evidence that the product underwent balanced and well considered planning, development, testing, quality control, and field testing. The predicted increased involvement of technical writers in the prevention and defense of product liability claims is cited in view of a greater number of cases turning on "failure to warn".

  16. Planning documents: a business planning strategy.

    PubMed

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  17. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    EPA Pesticide Factsheets

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  18. Policy Document on Earth Observation for Urban Planning and Management: State of the Art and Recommendations for Application of Earth Observation in Urban Planning

    NASA Technical Reports Server (NTRS)

    Nichol, Janet; King, Bruce; Xiaoli, Ding; Dowman, Ian; Quattrochi, Dale; Ehlers, Manfred

    2007-01-01

    A policy document on earth observation for urban planning and management resulting from a workshop held in Hong Kong in November 2006 is presented. The aim of the workshop was to provide a forum for researchers and scientists specializing in earth observation to interact with practitioners working in different aspects of city planning, in a complex and dynamic city, Hong Kong. A summary of the current state of the art, limitations, and recommendations for the use of earth observation in urban areas is presented here as a policy document.

  19. Development of Evidence-Based Health Policy Documents in Developing Countries: A Case of Iran

    PubMed Central

    Imani-Nasab, Mohammad Hasan; Seyedin, Hesam; Majdzadeh, Reza; Yazdizadeh, Bahareh; Salehi, Masoud

    2014-01-01

    Background: Evidence-based policy documents that are well developed by senior civil servants and are timely available can reduce the barriers to evidence utilization by health policy makers. This study examined the barriers and facilitators in developing evidence-based health policy documents from the perspective of their producers in a developing country. Methods: In a qualitative study with a framework analysis approach, we conducted semi-structured interviews using purposive and snowball sampling. A qualitative analysis software (MAXQDA-10) was used to apply the codes and manage the data. This study was theory-based and the results were compared to exploratory studies about the factors influencing evidence-based health policymaking. Results: 18 codes and three main themes of behavioral, normative, and control beliefs were identified. Factors that influence the development of evidence-based policy documents were identified by the participants: behavioral beliefs included quality of policy documents, use of resources, knowledge and innovation, being time-consuming and contextualization; normative beliefs included policy authorities, policymakers, policy administrators, and co-workers; and control beliefs included recruitment policy, performance management, empowerment, management stability, physical environment, access to evidence, policy making process, and effect of other factors. Conclusion: Most of the cited barriers to the development of evidence-based policy were related to control beliefs, i.e. barriers at the organizational and health system levels. This study identified the factors that influence the development of evidence-based policy documents based on the components of the theory of planned behavior. But in exploratory studies on evidence utilization by health policymakers, the identified factors were only related to control behaviors. This suggests that the theoretical approach may be preferable to the exploratory approach in identifying the barriers and facilitators of a behavior. PMID:24762343

  20. Development of evidence-based health policy documents in developing countries: a case of Iran.

    PubMed

    Imani-Nasab, Mohammad Hasan; Seyedin, Hesam; Majdzadeh, Reza; Yazdizadeh, Bahareh; Salehi, Masoud

    2014-02-07

    Evidence-based policy documents that are well developed by senior civil servants and are timely available can reduce the barriers to evidence utilization by health policy makers. This study examined the barriers and facilitators in developing evidence-based health policy documents from the perspective of their producers in a developing country. In a qualitative study with a framework analysis approach, we conducted semi-structured interviews using purposive and snowball sampling. A qualitative analysis software (MAXQDA-10) was used to apply the codes and manage the data. This study was theory-based and the results were compared to exploratory studies about the factors influencing evidence-based health policy-making. 18 codes and three main themes of behavioral, normative, and control beliefs were identified. Factors that influence the development of evidence-based policy documents were identified by the participants: behavioral beliefs included quality of policy documents, use of resources, knowledge and innovation, being time-consuming and contextualization; normative beliefs included policy authorities, policymakers, policy administrators, and co-workers; and control beliefs included recruitment policy, performance management, empowerment, management stability, physical environment, access to evidence, policy making process, and effect of other factors. Most of the cited barriers to the development of evidence-based policy were related to control beliefs, i.e. barriers at the organizational and health system levels. This study identified the factors that influence the development of evidence-based policy documents based on the components of the theory of planned behavior. But in exploratory studies on evidence utilization by health policymakers, the identified factors were only related to control behaviors. This suggests that the theoretical approach may be preferable to the exploratory approach in identifying the barriers and facilitators of a behavior.

  1. 17 CFR 230.428 - Documents constituting a section 10(a) prospectus for Form S-8 registration statement...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... employee benefit plan information required by Item 1 of the Form; (ii) The statement of availability of registrant information, employee benefit plan annual reports and other information required by Item 2; and (iii) The documents containing registrant information and employee benefit plan annual reports that are...

  2. A Plan for: A Consumer Conference for Older Adults.

    ERIC Educational Resources Information Center

    Zarakov, Selma

    This document provides a step-by-step description of the planning and implementation of a two day consumer concerns conference for older adults held at Palomar Community College (California). The bulk of the document is made up of practical discussions of such planning phases as facility selection and decoration, conference publicity, snack and…

  3. 30 CFR 746.13 - Decision document and recommendation on mining plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Decision document and recommendation on mining plan. 746.13 Section 746.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM REVIEW AND APPROVAL OF MINING PLANS § 746.13 Decision...

  4. Information security management system planning for CBRN facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  5. 43 CFR 46.315 - How to format an environmental assessment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... planning, decision-making, and appropriate public participation. (b) An environmental assessment may be accompanied by any other planning or decision-making document. The portion of the document that analyzes the...

  6. NASA Flight Planning Branch Space Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Clevenger, Jennifer D.; Bristol, Douglas J.; Whitney, Gregory R.; Blanton, Mark R.; Reynolds, F. Fisher, III

    2011-01-01

    Planning products and procedures that allowed the mission Flight Control Teams and the Astronaut crews to plan, train and fly every Space Shuttle mission were developed by the Flight Planning Branch at the NASA Johnson Space Center in Houston, Texas. As the Space Shuttle Program came to a close, lessons learned were collected from each phase of the successful execution of these Space Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines have been analyzed and will be discussed. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the Space Shuttle and ground team has also defined specific lessons used in improving the control team s effectiveness. Methodologies to communicate and transmit messages, images, and files from the Mission Control Center to the Orbiter evolved over several years. These lessons were vital in shaping the effectiveness of safe and successful mission planning and have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of Space Shuttle flight missions are not only documented in this paper, but are also discussed regarding how they pertain to changes in process and consideration for future space flight planning.

  7. Flight Planning Branch Space Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Price, Jennifer B.; Scott, Tracy A.; Hyde, Crystal M.

    2011-01-01

    Planning products and procedures that allow the mission flight control teams and the astronaut crews to plan, train and fly every Space Shuttle mission have been developed by the Flight Planning Branch at the NASA Johnson Space Center. As the Space Shuttle Program ends, lessons learned have been collected from each phase of the successful execution of these Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines will be discussed, as well as techniques and methods used to solve complex spacecraft and instrument orientation problems. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the shuttle and ground team has also defined specific lessons used in the improving the control teams effectiveness. Methodologies to communicate and transmit messages, images, and files from Mission Control to the Orbiter evolved over several years. These lessons have been vital in shaping the effectiveness of safe and successful mission planning that have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of shuttle flight missions are not only documented in this paper, but are also discussed as how they pertain to changes in process and consideration for future space flight planning.

  8. Advance Care Planning Documentation in Electronic Health Records: Current Challenges and Recommendations for Change.

    PubMed

    Lamas, Daniela; Panariello, Natalie; Henrich, Natalie; Hammes, Bernard; Hanson, Laura C; Meier, Diane E; Guinn, Nancy; Corrigan, Janet; Hubber, Sean; Luetke-Stahlman, Hannah; Block, Susan

    2018-04-01

    To develop a set of clinically relevant recommendations to improve the state of advance care planning (ACP) documentation in the electronic health record (EHR). Advance care planning (ACP) is a key process that supports goal-concordant care. For preferences to be honored, clinicians must be able to reliably record, find, and use ACP documentation. However, there are no standards to guide ACP documentation in the electronic health record (EHR). We interviewed 21 key informants to understand the strengths and weaknesses of EHR documentation systems for ACP and identify best practices. We analyzed these interviews using a qualitative content analysis approach and subsequently developed a preliminary set of recommendations. These recommendations were vetted and refined in a second round of input from a national panel of content experts. Informants identified six themes regarding current inadequacies in documentation and accessibility of ACP information and opportunities for improvement. We offer a set of concise, clinically relevant recommendations, informed by expert opinion, to improve the state of ACP documentation in the EHR.

  9. NASA software documentation standard software engineering program

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.

  10. Human factors aspects of control room design

    NASA Technical Reports Server (NTRS)

    Jenkins, J. P.

    1983-01-01

    A plan for the design and analysis of a multistation control room is reviewed. It is found that acceptance of the computer based information system by the uses in the control room is mandatory for mission and system success. Criteria to improve computer/user interface include: match of system input/output with user; reliability, compatibility and maintainability; easy to learn and little training needed; self descriptive system; system under user control; transparent language, format and organization; corresponds to user expectations; adaptable to user experience level; fault tolerant; dialog capability user communications needs reflected in flexibility, complexity, power and information load; integrated system; and documentation.

  11. Composite Overwrapped Pressure Vessels: Database Extension Task 3.0 and Impact Damage Effects Control Task 8.0

    NASA Technical Reports Server (NTRS)

    Beeson, Harold D.; Davis, Dennis D.; Ross, William L., Sr.; Tapphorn, Ralph M.

    2002-01-01

    This document represents efforts accomplished at the NASA Johnson Space Center White Sands Test Facility (WSTF) in support of the Enhanced Technology for Composite Overwrapped Pressure Vessels (COPV) Program, a joint research and technology effort among the U.S. Air Force, NASA, and the Aerospace Corporation. WSTF performed testing for several facets of the program. Testing that contributed to the Task 3.0 COPV database extension objective included baseline structural strength, failure mode and safe-life, impact damage tolerance, sustained load/impact effect, and materials compatibility. WSTF was also responsible for establishing impact protection and control requirements under Task 8.0 of the program. This included developing a methodology for establishing an impact control plan. Seven test reports detail the work done at WSTF. As such, this document contributes to the database of information regarding COPV behavior that will ensure performance benefits and safety are maintained throughout vessel service life.

  12. Management plan documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 2

    NASA Technical Reports Server (NTRS)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.

  13. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    USGS Publications Warehouse

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  14. A quality improvement project using a problem based post take ward round proforma based on the SOAP acronym to improve documentation in acute surgical receiving.

    PubMed

    Dolan, R; Broadbent, P

    2016-02-01

    Ward round documentation provides one of the most important means of communication between healthcare professionals. We aimed to establish if the use of a problem based standardised proforma can improve documentation in acute surgical receiving. Gold standards were established using the RCSE record keeping guidelines. We audited documentation for seven days using the following headings: patient name/identification number, subjective findings, objective findings, clinical impression/diagnosis, plan, diet status, discharge decision, discharge planning, signature, and grade. After the initial audit cycle, a ward round proforma was introduced using the above headings and re-audited over a seven day period. The pre-intervention arm contained 50 patients and the post intervention arm contained 47. The following headings showed an improvement in documentation compliance to 100%: patient name/identification number vs 96%, subjective findings vs 84%, objective findings vs 48%, plan vs 98%, signature vs 96%, and grade vs 62%. Documentation of the clinical impression/diagnosis improved to 98% vs 30%, diet status rose to 83% vs 16%, discharge decision to 66% vs 16%, and discharge planning to 40% vs 20%. Standardised proformas improve the documentation of post-take ward round notes. This helps to clarify the onward management plan for all aspects of a patient's care and will help avoid adverse events and litigation. This should improve the quality and safety of Patient Care.

  15. Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.

    PubMed

    Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C

    2015-08-01

    This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.

  16. EPA Guidance for Geospatially Related Quality Assurance Project Plans

    EPA Pesticide Factsheets

    This March 2003 document discusses EPA's Quality Assurance (QA) Project Plan as a tool for project managers and planners to document the type and quality of data and information needed for making environmental decisions

  17. Validation of a Novel Electronic Health Record Patient Portal Advance Care Planning Delivery System.

    PubMed

    Bose-Brill, Seuli; Feeney, Michelle; Prater, Laura; Miles, Laura; Corbett, Angela; Koesters, Stephen

    2018-06-26

    Advance care planning allows patients to articulate their future care preferences should they no longer be able to make decisions on their own. Early advance care planning in outpatient settings provides benefits such as less aggressive care and fewer hospitalizations, yet it is underutilized due to barriers such as provider time constraints and communication complexity. Novel methods, such as patient portals, provide a unique opportunity to conduct advance care planning previsit planning for outpatient care. This follow-up to our pilot study aimed to conduct pragmatic testing of a novel electronic health record-tethered framework and its effects on advance care planning delivery in a real-world primary care setting. Our intervention tested a previsit advance care planning workflow centered around a framework sent via secure electronic health record-linked patient portal in a real-world clinical setting. The primary objective of this study was to determine its impact on frequency and quality of advance care planning documentation. We conducted a pragmatic trial including 2 sister clinical sites, one site implementing the intervention and the other continuing standard care. A total of 419 patients aged between 50 and 93 years with active portal accounts received intervention (n=200) or standard care (n=219). Chart review analyzed the presence of advance care planning and its quality and was graded with previously established scoring criteria based on advance care planning best practice guidelines from multiple nations. A total of 19.5% (39/200) of patients who received previsit planning responded to the framework. We found that the intervention site had statistically significant improvement in new advance care planning documentation rates (P<.01) and quality (P<.01) among all eligible patients. Advance care planning documentation rates increased by 105% (19/39 to 39/39) and quality improved among all patients who engaged in the previsit planning framework (n=39). Among eligible patients aged between 50 and 60 years at the intervention site, advance care planning documentation rates increased by 37% (27/96 to 37/96). Advance care planning documentation rates increased 34% among high users (27/67 to 36/67). Advance care planning previsit planning using a secure electronic health record-supported patient portal framework yielded improvement in the presence of advance care planning documentation, with highest improvement in active patient portal users and patients aged between 50 and 60 years. Targeted previsit patient portal advance care planning delivery in these populations can potentially improve the quality of care in these populations. ©Seuli Bose-Brill, Michelle Feeney, Laura Prater, Laura Miles, Angela Corbett, Stephen Koesters. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 26.06.2018.

  18. [Design of an HACCP program for a cocoa processing facility].

    PubMed

    López D'Sola, Patrizia; Sandia, María Gabriela; Bou Rached, Lizet; Hernández Serrano, Pilar

    2012-12-01

    The HACCP plan is a food safety management tool used to control physical, chemical and biological hazards associated to food processing through all the processing chain. The aim of this work is to design a HACCP Plan for a Venezuelan cocoa processing facility.The production of safe food products requires that the HACCP system be built upon a solid foundation of prerequisite programs such as Good Manufacturing Practices (GMP) and Sanitation Standard Operating Procedures (SSOP). The existence and effectiveness of these prerequisite programs were previously assessed.Good Agriculture Practices (GAP) audit to cocoa nibs suppliers were performed. To develop the HACCP plan, the five preliminary tasks and the seven HACCP principles were accomplished according to Codex Alimentarius procedures. Three Critical Control Points (CCP) were identified using a decision tree: winnowing (control of ochratoxin A), roasting (Salmonella control) and metallic particles detection. For each CCP, Critical limits were established, the Monitoring procedures, Corrective actions, Procedures for Verification and Documentation concerning all procedures and records appropriate to these principles and their application was established. To implement and maintain a HACCP plan for this processing plant is suggested. Recently OchratoxinA (OTA) has been related to cocoa beans. Although the shell separation from the nib has been reported as an effective measure to control this chemical hazard, ochratoxin prevalence study in cocoa beans produced in the country is recommended, and validate the winnowing step as well

  19. Government documents and the online catalog.

    PubMed

    Lynch, F H; Lasater, M C

    1990-01-01

    Prior to planning for implementing the NOTIS system, the Vanderbilt Medical Center Library had not fully cataloged its government publications, and records for these materials were not in machine-readable format. A decision was made that patrons should need to look in only one place for all library materials, including the Health and Human Services Department publications received each year from the central library's Government Documents Unit. Beginning in 1985, these publications were added to the library's database, and the entire 7,200-piece collection is now in the online catalog. Working with these publications has taught the library much about the advantages and disadvantages of cataloging government documents in an online environment. It was found that OCLC cataloging copy is eventually available for most titles, although only about 10% of the records have MeSH headings. Staff time is the major expenditure; problems are caused by documents' irregular nature, frequent format changes, and difficult authority work. Since their addition to the online catalog, documents are used more and the library has better control.

  20. Government documents and the online catalog.

    PubMed Central

    Lynch, F H; Lasater, M C

    1990-01-01

    Prior to planning for implementing the NOTIS system, the Vanderbilt Medical Center Library had not fully cataloged its government publications, and records for these materials were not in machine-readable format. A decision was made that patrons should need to look in only one place for all library materials, including the Health and Human Services Department publications received each year from the central library's Government Documents Unit. Beginning in 1985, these publications were added to the library's database, and the entire 7,200-piece collection is now in the online catalog. Working with these publications has taught the library much about the advantages and disadvantages of cataloging government documents in an online environment. It was found that OCLC cataloging copy is eventually available for most titles, although only about 10% of the records have MeSH headings. Staff time is the major expenditure; problems are caused by documents' irregular nature, frequent format changes, and difficult authority work. Since their addition to the online catalog, documents are used more and the library has better control. PMID:2295010

  1. Curriculum Planning and Some Current Health Problems. Educational Studies and Documents, No. 13.

    ERIC Educational Resources Information Center

    Southworth, Warren H.

    This document is a supplement to the UNESCO Source Book "Planning for Health Education in Schools" by C. E. Turner. It is intended for those directly concerned with curriculum planning in relation to health--school administrators, health education supervisors, curriculum specialists, individual teachers--but it is also thought to be of interest to…

  2. 75 FR 11105 - Kootenai (KNF) and Idaho Panhandle National Forests (IPNF); Montana, Idaho and Washington...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... plan revision. The Comprehensive Evaluation Report (CER) provided for public review and comment in 2006, built upon the AMS and documents the evaluation of the 1987 Forest Plans and proposed changes. The CER.... The CER, under the 2005 and 2008 Planning Rules, served as the principle document that supported the...

  3. 23 CFR 420.111 - What are the documentation requirements for use of FHWA planning and research funds?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and subrecipients in a work program, or other document that describes the work to be accomplished... various combinations, or brought together as a single work program. The expenditure of PL funds for transportation planning outside of metropolitan planning areas under § 420.109(d) may be included in the work...

  4. Child Care and Education: The Critical Connection. Action Plan [and] Policy Statement.

    ERIC Educational Resources Information Center

    Child Care Action Campaign, New York, NY.

    This document presents the action plan of the Child Care Action Campaign (CCAC) for improving the quantity and quality of child care services. The document also provides a policy statement on linking education and child care efforts. The action plan describes CCAC's vision of a streamlined system providing child care to infants and toddlers,…

  5. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists tomore » assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.« less

  6. Lean Six Sigma Project - Defense Logistics Agency/Honeywell Long-Term Contract Model Using One-Pass Pricing for Sole-Source Spare Parts

    DTIC Science & Technology

    2011-02-18

    Control Limit Lower Control Limit Reaction Plan 1 Complaints from other suppliers (synopsis, award) SCG During award process Identify Sole- Source...Parts 0.0 1.0 0.0 Evaluate complaint, if valid remove item from contract. 2 Tracking timeline for procurement/reviews SCG During pre- award process...Review Solicitation 100.0 Determine where the document stands in the approval process. Adjust milestones and followup . 3 FAR/DPAP guidance SCG

  7. The effects of the application of SIMPRO on the completeness and time efficiency of nursing documentation in the outpatient instalation at Dompet Dhuafa Hospital Parung

    NASA Astrophysics Data System (ADS)

    Dwisatyadini, M.; Hariyati, R. T. S.; Afifah, E.

    2018-03-01

    Nursing documentation is clinical information that has a vital role in nursing services. The nursing process includes assessment, diagnosis, intervention, implementation, and evaluation. The purpose of this study was to determine the effects of the application of SIMPRO on the completeness and the efficiency of nursing documentation in the outpatient installation at Dompet Dhuafa Hospital Parung. This study used quantitative method with pre experimental (pre and posttest without control group) design. The mean of the documentation completeness marks before the application of SIMPRO was 1.87 (SD 0.922), and after SIMPRO was applied increased to 3.61 (0.588). This increase indicated an improvement of the nursing documentation completeness after the implementation of SIMPRO. The mean of time needed by nurses in documenting the nursing care before the application of SIMPRO was 476.13 seconds (SD 78.896). The mean of documenting time decreased more than a half after the application of SIMPRO which was 202.52 seconds (SD 196.723). SIMPRO made a nurse easier to take a decision analysis and decision support system to nursing care plan and documentation.

  8. Documents and Symbols of American Freedom. Elementary Grade Activity. Schools of California Online Resources for Education (SCORE): Connecting California's Classrooms to the World.

    ERIC Educational Resources Information Center

    Hutchens, Dorothy

    This lesson plan for elementary-age children studies some of the primary source documents and symbols of freedom which were and are important for the nation. The lesson plan uses the following documents: "The Mayflower Compact"; "The Declaration of Independence"; "The Constitution"; and the "Bill of Rights."…

  9. Planning Alternative Organizational Frameworks For a Large Scale Educational Telecommunications System Served by Fixed/Broadcast Satellites. Memorandum Number 73/3.

    ERIC Educational Resources Information Center

    Walkmeyer, John

    Considerations relating to the design of organizational structures for development and control of large scale educational telecommunications systems using satellites are explored. The first part of the document deals with four issues of system-wide concern. The first is user accessibility to the system, including proximity to entry points, ability…

  10. Comparisons of ANS, ASME, AWS, and NFPA standards cited in the NRC standard review plan, NUREG-0800, and related documents

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.

    This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented.more » Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.« less

  11. 300 Area waste acid treatment system closure plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less

  12. 76 FR 69172 - Determination of Governmental Plan Status

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ...The Treasury Department and IRS anticipate issuing regulations under section 414(d) of the Internal Revenue Code (Code) to define the term ``governmental plan.'' This document describes the rules that the Treasury Department and IRS are considering proposing relating to the determination of whether a plan is a governmental plan within the meaning of section 414(d) and contains an appendix that includes a draft notice of proposed rulemaking on which the Treasury Department and IRS invite comments from the public. This document applies to sponsors of, and participants and beneficiaries in, employee benefit plans that are determined to be governmental plans.

  13. Salvage plan & information sheet

    DOT National Transportation Integrated Search

    1997-11-05

    This document allows the On Scene Coordinator (OSC) or Captain of the Port (COTP) to formulate and evaluate the impact of a Salvage Plan. Specifically, this document allows the OSC or COTP to: 1. Quickly gather all information needed during the respo...

  14. FY 1998 Proposed Rail Improvement Program

    DOT National Transportation Integrated Search

    1997-01-01

    The Illinois Department of Transportation has, in the past, published its Rail program yearly, and its Rail plan as needs dictate. The department has combined : both documents into one. This new document, as with those Programs and Plans : that have ...

  15. Hanford Site Groundwater Protection Management Program: Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime,more » (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.« less

  16. The Village Green Project: Lesson Plans for K-8 Educators ...

    EPA Pesticide Factsheets

    This document contains lesson plans spanning kindergarten through 8th grade, that are written to connect next-generation science standards (USA) to the Village Green Project and related air quality topics. This document contains a series of classroom lesson plans to support connections between the Village Green Project and the USA National Science Standards at various education levels.

  17. 17 CFR 240.17a-6 - Right of national securities exchange, national securities association, registered clearing...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... plan may provide that any such document may be transferred to microfilm or other recording medium after... years or at such earlier date as is specified in a plan for the destruction or disposition of any such documents if such plan has been filed with the Commission by such exchange, association, clearing agency or...

  18. FDA plan for statutory compliance. Notice of availability.

    PubMed

    1998-11-24

    The Food and Drug Administration (FDA) is announcing the availability of a document entitled "FDA Plan for Statutory Compliance" (the plan). This document is the agency's response to section 406(b) of the Food and Drug Administration Modernization Act of 1997 (FDAMA), which requires the Secretary of the Department of Health and Human Services (the Secretary) to develop a plan bringing the agency into compliance with the requirements of the Federal Food, Drug, and Cosmetic Act (the act).

  19. Hypersonic Vehicle Propulsion System Simplified Model Development

    NASA Technical Reports Server (NTRS)

    Stueber, Thomas J.; Raitano, Paul; Le, Dzu K.; Ouzts, Peter

    2007-01-01

    This document addresses the modeling task plan for the hypersonic GN&C GRC team members. The overall propulsion system modeling task plan is a multi-step process and the task plan identified in this document addresses the first steps (short term modeling goals). The procedures and tools produced from this effort will be useful for creating simplified dynamic models applicable to a hypersonic vehicle propulsion system. The document continues with the GRC short term modeling goal. Next, a general description of the desired simplified model is presented along with simulations that are available to varying degrees. The simulations may be available in electronic form (FORTRAN, CFD, MatLab,...) or in paper form in published documents. Finally, roadmaps outlining possible avenues towards realizing simplified model are presented.

  20. Standardised care plans for in hospital stroke care improve documentation of health care assessments.

    PubMed

    Pöder, Ulrika; Dahm, Marie Fogelberg; Karlsson, Nina; Wadensten, Barbro

    2015-10-01

    To compare stroke unit staff members' documentation of care in line with evidence-based guidelines pre- and postimplementation of a multi-professional, evidence-based standardised care plan for stroke care in the electronic health record. Rapid and effective measures for patients with stroke or suspected stroke can limit the extent of damage; it is imperative that patients be observed, assessed and treated in accordance with evidence-based practice in hospital. Quantitative, comparative. Structured retrospective health record reviews were made prior to (n 60) and one and a half years after implementation (n 60) of a multi-professional evidence-based standardised care plan with a quality standard for stroke care in the electronic health record. Significant improvements were found in documentation of assessed vital signs, except for body temperature, Day 1 post compared with preimplementation. Documentation frequency regarding body temperature Day 1 and blood pressure and pulse Day 2 decreased post compared with preimplementation. Improvements were also detected in documented observations of patients' micturition capacity, swallowing capacity and mouth status and the proportion of physiotherapist-documented aid assessments. Observations of blood glucose, mobilisation ability and speech and communication ability were unchanged. An evidence-based standardised care plan in an electronic health record assists staff in improving documentation of health status assessments during the first days after a stroke diagnosis. Use of a standardised care plan seems to have the potential to help staff adhere to evidence-based patient care and, thereby, to increase patient safety. © 2015 John Wiley & Sons Ltd.

  1. The Intelligent Flight Control Program (IFCS)

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Institute for Scientific Research, Inc. (ISR) is pleased to submit this closeout report for the Research Cooperative Agreement NCC4-00128 of accomplishments for the Intelligent Flight Control System (IFCS) Project. It has been a pleasure working with NASA and NASA partners as we strive to meet the goals of this research initiative. ISR was engaged in this Research Cooperative Agreement beginning March 3, 2001 and ending March 31, 2003. During this time, a great deal has been accomplished and plans have been solidified for the continued success of this program. Our primary areas of involvement include the following: 1) ARTS II Master Test Plan; 2) ARTS II Hardware Design and Development; 3) ARTS II Software Design and Development; 4) IFCS PID/BLNN/OLNN Development; 5) Performed Preliminary and Formal Testing; 6) Documentation and Reporting.

  2. Theory of Planned Behavior explains gender difference in fruit and vegetable consumption.

    PubMed

    Emanuel, Amber S; McCully, Scout N; Gallagher, Kristel M; Updegraff, John A

    2012-12-01

    A gender difference in fruit and vegetable intake (FVI) is widely documented, but not well understood. Using data from the National Cancer Institute's Food Attitudes and Behavior Survey, we assessed the extent to which gender differences in FVI are attributable to gender differences in constructs from the Theory of Planned Behavior (TPB). Females reported more favorable attitudes and greater perceived behavior control regarding FVI than males, and these beliefs mediated the observed gender difference. Males reported greater perceived norms for FVI, but norms did not predict FVI. Gender did not moderate the influence of TPB constructs on FVI. Thus, TPB constructs substantially explained the gender difference. Interventions targeted toward adult males may benefit by promoting favorable attitudes and perceived behavioral control over FVI. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. "I'm still here": Exploring what matters to people with intellectual disability during advance care planning.

    PubMed

    McKenzie, Nicola; Mirfin-Veitch, Brigit; Conder, Jennifer; Brandford, Sharon

    2017-11-01

    This study sought to identify, from the perspective of people with intellectual disabilities and life limiting conditions, the factors that strengthened and inhibited their Advance Care Planning. This in depth qualitative study explored the experiences of four people with intellectual disability and life limiting conditions, through interviews and documentation reviews. There was strong agreement across all participants about what positively influenced Advance Care Planning, namely; going at my pace; supporting me to make my own choices; adapting the process to suit me, and, most importantly; continuing to support and plan the life I'm still living. With the exception of being comfortable/skilled in end-of-life support, the skills required of facilitators were similar to those required for all forms of person-centred planning. The findings are encouraging and demonstrate that Advance Care Planning is a useful tool in ensuring that people with intellectual disability have control and choice over their lives, right to the end. © 2017 John Wiley & Sons Ltd.

  4. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  5. Network Operations Support Plan for the Spot 2 mission (revision 1)

    NASA Technical Reports Server (NTRS)

    Werbitzky, Victor

    1989-01-01

    The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.

  6. 40 CFR 60.4355 - How do I establish and document a proper parameter monitoring plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards of Performance for Stationary Combustion Turbines Monitoring § 60.4355 How do I establish and document a proper parameter monitoring plan? (a) The steam or water to fuel ratio or other parameters that...

  7. A controlled study of a simulated workplace laboratory for adults with attention deficit hyperactivity disorder.

    PubMed

    Fried, Ronna; Surman, Craig; Hammerness, Paul; Petty, Carter; Faraone, Stephen; Hyder, Laran; Westerberg, Diana; Small, Jacqueline; Corkum, Lyndsey; Claudat, Kim; Biederman, Joseph

    2012-12-30

    Despite an extant literature documenting that adults with attention-deficit/hyperactivity disorder (ADHD) are at increased risk for significant difficulties in the workplace, there is little documentation of the underlying factors associated with these impairments. The main aim of this study was to examine specific deficiencies associated with ADHD on workplace performance in a simulated workplace laboratory relative to controls. Participants were 56 non-medicated young adults with DSM-IV ADHD and 63 age- and sex-matched controls without ADHD. Participants spent 10h in a workplace simulation laboratory. Areas assessed included: (1) simulated tasks documented in a government report (SCANS) often required in workplace settings (taxing vigilance; planning; cooperation; attention to detail), (2) observer ratings, and (3) self-reports. Robust findings were found in the statistically significant differences on self-report of ADHD symptoms found between participants with ADHD and controls during all workplace tasks and periods of the workday. Task performance was found to be deficient in a small number of areas, and there were a few statistically significant differences identified by observer ratings. Symptoms reported by participants with ADHD in the simulation including internal restlessness, intolerance of boredom and difficulty maintaining vigilance were significant and could adversely impact workplace performance over the long-term. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  8. Notional Airspace Operations Demonstration Plan

    NASA Technical Reports Server (NTRS)

    Trongale, Nicholas A.

    2006-01-01

    The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in the NAS Preliminary planning for a notional mission to achieve the objectives and goals has been prepared. The planning is intended to serve as a guide for detailed planning of the AOD.

  9. Performance validation of the ANSER control laws for the F-18 HARV

    NASA Technical Reports Server (NTRS)

    Messina, Michael D.

    1995-01-01

    The ANSER control laws were implemented in Ada by NASA Dryden for flight test on the High Alpha Research Vehicle (HARV). The Ada implementation was tested in the hardware-in-the-loop (HIL) simulation, and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model.' This report documents the performance validation test results between these implementations. This report contains the ANSER performance validation test plan, HIL versus batch time-history comparisons, simulation scripts used to generate checkcases, and detailed analysis of discrepancies discovered during testing.

  10. Performance validation of the ANSER Control Laws for the F-18 HARV

    NASA Technical Reports Server (NTRS)

    Messina, Michael D.

    1995-01-01

    The ANSER control laws were implemented in Ada by NASA Dryden for flight test on the High Alpha Research Vehicle (HARV). The Ada implementation was tested in the hardware-in-the-loop (HIL) simulation, and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model'. This report documents the performance validation test results between these implementations. This report contains the ANSER performance validation test plan, HIL versus batch time-history comparisons, simulation scripts used to generate checkcases, and detailed analysis of discrepancies discovered during testing.

  11. [Infrastructure and contents of clinical data management plan].

    PubMed

    Shen, Tong; Xu, Lie-dong; Fu, Hai-jun; Liu, Yan; He, Jia; Chen, Ping-yan; Song, Yu-fei

    2015-11-01

    Establishment of quality management system (QMS) plays a critical role in the clinical data management (CDM). The objectives of CDM are to ensure the quality and integrity of the trial data. Thus, every stage or element that may impact the quality outcomes of clinical studies should be in the controlled manner, which is referred to the full life cycle of CDM associated with the data collection, handling and statistical analysis of trial data. Based on the QMS, this paper provides consensus on how to develop a compliant clinical data management plan (CDMP). According to the essential requirements of the CDM, the CDMP should encompass each process of data collection, data capture and cleaning, medical coding, data verification and reconciliation, database monitoring and management, external data transmission and integration, data documentation and data quality assurance and so on. Creating and following up data management plan in each designed data management steps, dynamically record systems used, actions taken, parties involved will build and confirm regulated data management processes, standard operational procedures and effective quality metrics in all data management activities. CDMP is one of most important data management documents that is the solid foundation for clinical data quality.

  12. Advanced Life Support Systems

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.

    2004-01-01

    This presentation is planned to be a 10-15 minute "catalytic" focused presentation to be scheduled during one of the working sessions at the TIM. This presentation will focus on Advanced Life Support technologies key to future human Space Exploration as outlined in the Vision, and will include basic requirements, assessment of the state-of-the-art and gaps, and include specific technology metrics. The presentation will be technical in character, lean heavily on data in published ALS documents (such as the Baseline Values and Assumptions Document) but not provide specific technical details or build to information on any technology mentioned (thus the presentation will be benign from an export control and a new technology perspective). The topics presented will be focused on the following elements of Advanced Life Support: air revitalization, water recovery, waste management, thermal control, habitation systems, food systems and bioregenerative life support.

  13. Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)

    NASA Astrophysics Data System (ADS)

    Greenberg, H. S.

    1994-07-01

    This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.

  14. Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)

    NASA Technical Reports Server (NTRS)

    Greenberg, H. S.

    1994-01-01

    This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.

  15. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    DOT National Transportation Integrated Search

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  16. 76 FR 41799 - Agency Information Collection Activities: Proposed Collection; Comment Request; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E&E-APD); Use: Under... Eligibility/Enrollment Systems APD approval assignment. The information requested on the Checklist will be... an Expedited Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E& -APD...

  17. NASA Software Documentation Standard

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.

  18. Saltcedar and Russian Olive Control Demonstration Act Science Assessment

    USGS Publications Warehouse

    Shafroth, Patrick B.; Brown, Curtis A.; Merritt, David M.

    2010-01-01

    The primary intent of this document is to provide the science assessment called for under The Saltcedar and Russian Olive Control Demonstration Act of 2006 (Public Law 109-320; the Act). A secondary purpose is to provide a common background for applicants for prospective demonstration projects, should funds be appropriated for this second phase of the Act. This document synthesizes the state-of-the-science on the following topics: the distribution and abundance (extent) of saltcedar (Tamarix spp.) and Russian olive (Elaeagnus angustifolia) in the Western United States, potential for water savings associated with controlling saltcedar and Russian olive and the associated restoration of occupied sites, considerations related to wildlife use of saltcedar and Russian olive habitat or restored habitats, methods to control saltcedar and Russian olive, possible utilization of dead biomass following removal of saltcedar and Russian olive, and approaches and challenges associated with revegetation or restoration following control efforts. A concluding chapter discusses possible long-term management strategies, needs for additional study, potentially useful field demonstration projects, and a planning process for on-the-ground projects involving removal of saltcedar and Russian olive.

  19. Rapid Equipping Force (REF) Analytical Support

    DTIC Science & Technology

    2007-06-01

    document contains color images. 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT UU 18. NUMBER OF PAGES 44...interface and performs actions via Excel formulae, ActiveX controls, and VBA code. – Plan to provide both simple and complex weighting and scoring methods...Requirements Quad Chart. –Solution Set Information Worksheet: A spreadsheet containing detailed information concerning every potential solution considered

  20. A Study of Placing Army Requirements on Contract

    DTIC Science & Technology

    2016-04-01

    perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011

  1. No Further Remedial Action Planned Decision Document for Site 3.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery

  2. Alvarado Flood Risk Management Modifications to Existing Project Section 408 Review. Review Plan

    DTIC Science & Technology

    2012-12-26

    Digital Flood Insurance Rate Maps) through the Nationa l Flood Insurance Program ( NFIP ). In order to obtain FEMA accreditation, the levee owner...compliance documentation for meeting NFIP requirements. Barr conducted a thorough review of relevant documents to gain a better understanding of...compliance documentation for meeting NFIP requirements. Barr Engineering has prepared a Phase I Engineer’s Report and is developing plans and

  3. SBKF Modeling and Analysis Plan: Buckling Analysis of Compression-Loaded Orthogrid and Isogrid Cylinders

    NASA Technical Reports Server (NTRS)

    Lovejoy, Andrew E.; Hilburger, Mark W.

    2013-01-01

    This document outlines a Modeling and Analysis Plan (MAP) to be followed by the SBKF analysts. It includes instructions on modeling and analysis formulation and execution, model verification and validation, identifying sources of error and uncertainty, and documentation. The goal of this MAP is to provide a standardized procedure that ensures uniformity and quality of the results produced by the project and corresponding documentation.

  4. A pilot study on the evaluation of medical student documentation: assessment of SOAP notes.

    PubMed

    Seo, Ji-Hyun; Kong, Hyun-Hee; Im, Sun-Ju; Roh, HyeRin; Kim, Do-Kyong; Bae, Hwa-Ok; Oh, Young-Rim

    2016-06-01

    The purpose of this study was evaluation of the current status of medical students' documentation of patient medical records. We checked the completeness, appropriateness, and accuracy of 95 Subjective-Objective-Assessment-Plan (SOAP) notes documented by third-year medical students who participated in clinical skill tests on December 1, 2014. Students were required to complete the SOAP note within 15 minutes of an standard patient (SP)-encounter with a SP complaining rhinorrhea and warring about meningitis. Of the 95 SOAP notes reviewed, 36.8% were not signed. Only 27.4% documented the patient's symptoms under the Objective component, although all students completed the Subjective notes appropriately. A possible diagnosis was assessed by 94.7% students. Plans were described in 94.7% of the SOAP notes. Over half the students planned workups (56.7%) for diagnosis and treatment (52.6%). Accurate documentation of the symptoms, physical findings, diagnoses, and plans were provided in 78.9%, 9.5%, 62.1%, and 38.0% notes, respectively. Our results showed that third-year medical students' SOAP notes were not complete, appropriate, or accurate. The most significant problems with completeness were the omission of students' signatures, and inappropriate documentation of the physical examinations conducted. An education and assessment program for complete and accurate medical recording has to be developed.

  5. Aging management program of the reactor building concrete at Point Lepreau Generating Station

    NASA Astrophysics Data System (ADS)

    Aldea, C.-M.; Shenton, B.; Demerchant, M. M.; Gendron, T.

    2011-04-01

    In order for New Brunswick Power Nuclear (NBPN) to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS) the development of an aging management plan (AMP) was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.

  6. Safety analysis and review system (SARS) assessment report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Browne, E.T.

    1981-03-01

    Under DOE Order 5481.1, Safety Analysis and Review System for DOE Operations, safety analyses are required for DOE projects in order to ensure that: (1) potential hazards are systematically identified; (2) potential impacts are analyzed; (3) reasonable measures have been taken to eliminate, control, or mitigate the hazards; and (4) there is documented management authorization of the DOE operation based on an objective assessment of the adequacy of the safety analysis. This report is intended to provide the DOE Office of Plans and Technology Assessment (OPTA) with an independent evaluation of the adequacy of the ongoing safety analysis effort. Asmore » part of this effort, a number of site visits and interviews were conducted, and FE SARS documents were reviewed. The latter included SARS Implementation Plans for a number of FE field offices, as well as safety analysis reports completed for certain FE operations. This report summarizes SARS related efforts at the DOE field offices visited and evaluates the extent to which they fulfill the requirements of DOE 5481.1.« less

  7. A Hyperbolic Ontology Visualization Tool for Model Application Programming Interface Documentation

    NASA Technical Reports Server (NTRS)

    Hyman, Cody

    2011-01-01

    Spacecraft modeling, a critically important portion in validating planned spacecraft activities, is currently carried out using a time consuming method of mission to mission model implementations and integration. A current project in early development, Integrated Spacecraft Analysis (ISCA), aims to remedy this hindrance by providing reusable architectures and reducing time spent integrating models with planning and sequencing tools. The principle objective of this internship was to develop a user interface for an experimental ontology-based structure visualization of navigation and attitude control system modeling software. To satisfy this, a number of tree and graph visualization tools were researched and a Java based hyperbolic graph viewer was selected for experimental adaptation. Early results show promise in the ability to organize and display large amounts of spacecraft model documentation efficiently and effectively through a web browser. This viewer serves as a conceptual implementation for future development but trials with both ISCA developers and end users should be performed to truly evaluate the effectiveness of continued development of such visualizations.

  8. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Healthmore » Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.« less

  9. Connected Vehicle Pilot Deployment Program phase 1 : performance measurement and evaluation support plan : New York City : final report.

    DOT National Transportation Integrated Search

    2016-07-12

    This document describes the Performance Measurement and Evaluation Support Plan for the New York City Department of Transportation New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. The report documents the performance metrics tha...

  10. Computer Disaster Recovery Planning.

    ERIC Educational Resources Information Center

    Clark, Orvin R.

    Arguing that complete, reliable, up-to-date system documentation is critical for every data processing environment, this paper on computer disaster recovery planning begins by discussing the importance of such documentation both for recovering from a systems crash, and for system maintenance and enhancement. The various components of system…

  11. Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CAMPBELL, L.R.

    1999-09-29

    This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.

  12. Cloud computing strategic framework (FY13 - FY15).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arellano, Lawrence R.; Arroyo, Steven C.; Giese, Gerald J.

    This document presents an architectural framework (plan) and roadmap for the implementation of a robust Cloud Computing capability at Sandia National Laboratories. It is intended to be a living document and serve as the basis for detailed implementation plans, project proposals and strategic investment requests.

  13. Supporting Active Living Through Community Plans: The Association of Planning Documents With Design Standards and Features.

    PubMed

    Peterson, Erin L; Carlson, Susan A; Schmid, Thomas L; Brown, David R; Galuska, Deborah A

    2018-01-01

    The purpose of this study was to examine the association between the presence of supportive community planning documents in US municipalities with design standards and requirements supportive of active living. Cross-sectional study using data from the 2014 National Survey of Community-Based Policy and Environmental Supports for Healthy Eating and Active Living. Nationally representative sample of US municipalities. Respondents are 2005 local officials. Assessed: (1) The presence of design standards and feature requirements and (2) the association between planning documents and design standards and feature requirements supportive of active living in policies for development. Using logistic regression, significant trends were identified in the presence of design standards and feature requirements by plan and number of supportive objectives present. Prevalence of design standards ranged from 19% (developer dedicated right-of-way for bicycle infrastructure development) to 50% (traffic-calming features in areas with high pedestrian and bicycle volume). Features required in policies for development ranged from 14% (short/medium pedestrian-scale block sizes) to 44% (minimum sidewalk widths of 5 feet) of municipalities. As the number of objectives in municipal plans increased, there was a significant and positive trend ( P < .05) in the prevalence of each design standard and requirement. Municipal planning documents containing objectives supportive of physical activity are associated with design standards and feature requirements supportive of activity-friendly communities.

  14. [Diffusion of clinical governance among the Italian Local Health Units (LHUs). Analysis of the Health Surveys, the Firm Acts and the Health Plans].

    PubMed

    de Belvis, A G; Biasco, A; Pelone, F; Romaniello, A; De Micco, F; Volpe, M; Ricciardi, W

    2009-01-01

    The objective of our research is to report on the diffusion of Clinical Governance, as introduced with the National Health Plan 2006-2008, by analysing the planning instruments set up by each Region (Regional Health Plans and Emergency Plans in regions with budget deficit), the organizational frameworks (Atti Aziendali, firm acts), and the surveys on performance and quality of healthcare among the Italian Local Health Units (Health Surveys). Our research was realized on September-December 2007 and consisted of the collection of all retrieved documents available on the web and on the online public access catalog (OPAC SBN) of the National Library Service. Futhermore, each document has been classified and analysed according to Chambers' Clinical Governance definition. A descriptive statistical and inferential analysis by applying the Chi-2 Test was performed to test the correlation between the diffusion of such a classified documents and the geographical partition of each LHU. Our results show a scarce diffusion of Firm acts (43%) and Health Surveys (24.9% of the total). Any remind to Clinical Governance instruments and methods inside each document resulted even poorer among both the organizational and performance surveys and the regional health planning frameworks, respectively.

  15. US-VISIT Identity Matching Algorithm Evaluation Program: ADIS Algorithm Evaluation Project Plan Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant, C W; Lenderman, J S; Gansemer, J D

    This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed bymore » Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).« less

  16. Timeliness of Care Planning upon Initiation of Chronic Opioid Therapy for Chronic Pain.

    PubMed

    Von Korff, Michael; Turner, Judith A; Shortreed, Susan M; Saunders, Kathleen; Rosenberg, Dori; Thielke, Stephen; LeResche, Linda

    2016-03-01

    Chronic opioid therapy (COT) guidelines recommend developing a COT care plan at the initiation of COT. Assess the timeliness of care planning upon initiation of COT. Observational cohort study in a setting incentivizing and tracking documentation of COT care plans in electronic health records (EHRs). Study participants (N = 896) were aged 45 years or older, had initiated an episode of opioid use within the prior 6 months, and reported regular use of prescription analgesics when screened for a baseline interview about 3 months after an index opioid prescription MEASURES: A timely care plan was defined by an EHR documented care plan prior to or within 4 months after the index opioid prescription. Among COT initiators, 30% had a timely COT care plan documented in the EHR within 4 months following index prescription, while 51% had a documented COT care plan within 12 months following index prescription. Among those interviewed at 1 year follow-up (N = 735), 252 (34.2%) reported opioid use on 7 or more days in the prior 2 weeks. Less than half (45.6%) of the 252 individuals who sustained regular opioid use at 1 year had predicted at baseline that it was somewhat, very, or extremely likely they would be using opioids regularly in 1 year. Patients initiating COT were unlikely to have timely COT care plans. Many who sustained regular opioid use at 1 year had not anticipated using opioids long term. © 2015 American Academy of Pain Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  18. College Graduate Retention: An Initiative Planning Document for Medina, Portage, Summit, Stark and Wayne Counties. Ohio Department of Job and Family Services and Ohio Department of Development Graduate Retention Initiative

    ERIC Educational Resources Information Center

    Stark Education Partnership, 2011

    2011-01-01

    This document represents the findings of the Greater Akron and Canton Regional Chambers of Commerce under an Ohio Department of Job and Family Services and Ohio Department of Development Graduate Retention Initiative (GRI) Planning Grant. The document also includes a proposal for the implementation phase of the initiative with a geographic scope…

  19. Analytical control test plan and microbiological methods for the water recovery test

    NASA Technical Reports Server (NTRS)

    Traweek, M. S. (Editor); Tatara, J. D. (Editor)

    1994-01-01

    Qualitative and quantitative laboratory results are important to the decision-making process. In some cases, they may represent the only basis for deciding between two or more given options or processes. Therefore, it is essential that handling of laboratory samples and analytical operations employed are performed at a deliberate level of conscientious effort. Reporting erroneous results can lead to faulty interpretations and result in misinformed decisions. This document provides analytical control specifications which will govern future test procedures related to all Water Recovery Test (WRT) Phase 3 activities to be conducted at the National Aeronautics and Space Administration/Marshall Space Flight Center (NASA/MSFC). This document addresses the process which will be used to verify analytical data generated throughout the test period, and to identify responsibilities of key personnel and participating laboratories, the chains of communication to be followed, and ensure that approved methodology and procedures are used during WRT activities. This document does not outline specifics, but provides a minimum guideline by which sampling protocols, analysis methodologies, test site operations, and laboratory operations should be developed.

  20. 29 CFR 4050.6 - Payment and required documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MISSING PARTICIPANTS § 4050.6 Payment and required documentation. (a) Time of payment and filing. The plan... administrator and the plan's enrolled actuary) specified in the missing participant forms and instructions, by the time the post-distribution certification is due. Except as otherwise provided in the missing...

  1. 29 CFR 4050.6 - Payment and required documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MISSING PARTICIPANTS § 4050.6 Payment and required documentation. (a) Time of payment and filing. The plan... administrator and the plan's enrolled actuary) specified in the missing participant forms and instructions, by the time the post-distribution certification is due. Except as otherwise provided in the missing...

  2. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  3. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  4. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  5. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  6. 45 CFR 1355.54 - Submittal of advance planning documents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL...

  7. 45 CFR 1355.54 - Submittal of advance planning documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL...

  8. 45 CFR 1355.54 - Submittal of advance planning documents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL...

  9. Government Materials on Enrollment Management and Planning in Higher Education: A Resource Guide.

    ERIC Educational Resources Information Center

    Lewis, David G.

    The guide is intended to provide admissions directors, academic deans, institutional planning officers, and faculty with access to government sources of information concerning college enrollment management. Sections provide information on: using the guide; additional government document information sources; using government documents; acquiring…

  10. 78 FR 41882 - Airworthiness Directives; Dassault Aviation Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ..., Airworthiness Limitations, Revision 18, dated July 2012, of Chapter 5, Maintenance Planning Document, of the... Limitations, Revision 18, dated July 2012, of Chapter 5, Maintenance Planning Document, of the Dassualt Falcon... requirements.'' Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in...

  11. Arizona TeleMedicine Network: Engineering Master Plan.

    ERIC Educational Resources Information Center

    Atlantic Research Corp., Alexandria, VA.

    As the planning document for establishing a statewide health communications system initially servicing the Papago, San Carlos and White Mountain Apache, Navajo, and Hopi reservations, this document prescribes the communications services to be provided by the Arizona TeleMedicine Network. Specifications include: (1) communications services for each…

  12. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  13. Advanced flight deck/crew station simulator functional requirements

    NASA Technical Reports Server (NTRS)

    Wall, R. L.; Tate, J. L.; Moss, M. J.

    1980-01-01

    This report documents a study of flight deck/crew system research facility requirements for investigating issues involved with developing systems, and procedures for interfacing transport aircraft with air traffic control systems planned for 1985 to 2000. Crew system needs of NASA, the U.S. Air Force, and industry were investigated and reported. A matrix of these is included, as are recommended functional requirements and design criteria for simulation facilities in which to conduct this research. Methods of exploiting the commonality and similarity in facilities are identified, and plans for exploiting this in order to reduce implementation costs and allow efficient transfer of experiments from one facility to another are presented.

  14. Reliability program requirements for aeronautical and space system contractors

    NASA Technical Reports Server (NTRS)

    1987-01-01

    General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.

  15. Balancing Plan-Driven and Agile Methods in Software Engineering Project Courses

    NASA Astrophysics Data System (ADS)

    Boehm, Barry; Port, Dan; Winsor Brown, A.

    2002-09-01

    For the past 6 years, we have been teaching a two-semester software engineering project course. The students organize into 5-person teams and develop largely web-based electronic services projects for real USC campus clients. We have been using and evolving a method called Model- Based (System) Architecting and Software Engineering (MBASE) for use in both the course and in industrial applications. The MBASE Guidelines include a lot of documents. We teach risk-driven documentation: if it is risky to document something, and not risky to leave it out (e.g., GUI screen placements), leave it out. Even so, students tend to associate more documentation with higher grades, although our grading eventually discourages this. We are always on the lookout for ways to have students learn best practices without having to produce excessive documentation. Thus, we were very interested in analyzing the various emerging agile methods. We found that agile methods and milestone plan-driven methods are part of a “how much planning is enough?” spectrum. Both agile and plan-driven methods have home grounds of project characteristics where they clearly work best, and where the other will have difficulties. Hybrid agile/plan-driven approaches are feasible, and necessary for projects having a mix of agile and plan-driven home ground characteristics. Information technology trends are going more toward the agile methods' home ground characteristics of emergent requirements and rapid change, although there is a concurrent increase in concern with dependability. As a result, we are currently experimenting with risk-driven combinations of MBASE and agile methods, such as integrating requirements, test plans, peer reviews, and pair programming into “agile quality management.”

  16. Public health human resources: a comparative analysis of policy documents in two Canadian provinces

    PubMed Central

    2014-01-01

    Background Amidst concerns regarding the capacity of the public health system to respond rapidly and appropriately to threats such as pandemics and terrorism, along with changing population health needs, governments have focused on strengthening public health systems. A key factor in a robust public health system is its workforce. As part of a nationally funded study of public health renewal in Canada, a policy analysis was conducted to compare public health human resources-relevant documents in two Canadian provinces, British Columbia (BC) and Ontario (ON), as they each implement public health renewal activities. Methods A content analysis of policy and planning documents from government and public health-related organizations was conducted by a research team comprised of academics and government decision-makers. Documents published between 2003 and 2011 were accessed (BC = 27; ON = 20); documents were either publicly available or internal to government and excerpted with permission. Documentary texts were deductively coded using a coding template developed by the researchers based on key health human resources concepts derived from two national policy documents. Results Documents in both provinces highlighted the importance of public health human resources planning and policies; this was particularly evident in early post-SARS documents. Key thematic areas of public health human resources identified were: education, training, and competencies; capacity; supply; intersectoral collaboration; leadership; public health planning context; and priority populations. Policy documents in both provinces discussed the importance of an educated, competent public health workforce with the appropriate skills and competencies for the effective and efficient delivery of public health services. Conclusion This policy analysis identified progressive work on public health human resources policy and planning with early documents providing an inventory of issues to be addressed and later documents providing evidence of beginning policy development and implementation. While many similarities exist between the provinces, the context distinctive to each province has influenced and shaped how they have focused their public health human resources policies. PMID:24564931

  17. Public health human resources: a comparative analysis of policy documents in two Canadian provinces.

    PubMed

    Regan, Sandra; MacDonald, Marjorie; Allan, Diane E; Martin, Cheryl; Peroff-Johnston, Nancy

    2014-02-24

    Amidst concerns regarding the capacity of the public health system to respond rapidly and appropriately to threats such as pandemics and terrorism, along with changing population health needs, governments have focused on strengthening public health systems. A key factor in a robust public health system is its workforce. As part of a nationally funded study of public health renewal in Canada, a policy analysis was conducted to compare public health human resources-relevant documents in two Canadian provinces, British Columbia (BC) and Ontario (ON), as they each implement public health renewal activities. A content analysis of policy and planning documents from government and public health-related organizations was conducted by a research team comprised of academics and government decision-makers. Documents published between 2003 and 2011 were accessed (BC = 27; ON = 20); documents were either publicly available or internal to government and excerpted with permission. Documentary texts were deductively coded using a coding template developed by the researchers based on key health human resources concepts derived from two national policy documents. Documents in both provinces highlighted the importance of public health human resources planning and policies; this was particularly evident in early post-SARS documents. Key thematic areas of public health human resources identified were: education, training, and competencies; capacity; supply; intersectoral collaboration; leadership; public health planning context; and priority populations. Policy documents in both provinces discussed the importance of an educated, competent public health workforce with the appropriate skills and competencies for the effective and efficient delivery of public health services. This policy analysis identified progressive work on public health human resources policy and planning with early documents providing an inventory of issues to be addressed and later documents providing evidence of beginning policy development and implementation. While many similarities exist between the provinces, the context distinctive to each province has influenced and shaped how they have focused their public health human resources policies.

  18. Curation, Spacecraft Recovery and Preliminary Examination for the Stardust Mission: A Perspective from the Curatorial Facility

    NASA Technical Reports Server (NTRS)

    Zolensky, Michael; Nakamura-Messenger, Keiko; Fletcher, Lisa; See, Thomas

    2008-01-01

    We briefly describe some of the challenges to the Stardust mission, curation and sample preliminary analysis, from the perspective of the Curation Office at the Johnson Space Center. Our goal is to inform persons planning future sample returns, so that they may learn from both our successes and challenges (and avoid some of our mistakes). The Curation office played a role in the mission from its inception, most critically assisting in the design and implementation of the spacecraft contamination control plan, and in planning and documenting the recovery of the spacecraft reentry capsule in Utah. A unique class 100 cleanroom was built to maintain the returned comet and interstellar samples in clean comfort, and to permit dissection and allocation of samples for analysis.

  19. Administrator's Guide to Technology: Planning, Funding & Implementation.

    ERIC Educational Resources Information Center

    Aspen Education Development Group, Gaithersburg, MD.

    This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…

  20. Training Manual for Elements of Interface Definition and Control

    NASA Technical Reports Server (NTRS)

    Lalli, Vincent R. (Editor); Kastner, Robert E. (Editor); Hartt, Henry N. (Editor)

    1997-01-01

    The primary thrust of this manual is to ensure that the format and information needed to control interfaces between equipment are clear and understandable. The emphasis is on controlling the engineering design of the interface and not on the functional performance requirements of the system or the internal workings of the interfacing equipment. Interface control should take place, with rare exception, at the interfacing elements and no further. There are two essential sections of the manual. Chapter 2, Principles of Interface Control, discusses how interfaces are defined. It describes different types of interfaces to be considered and recommends a format for the documentation necessary for adequate interface control. Chapter 3, The Process: Through the Design Phases, provides tailored guidance for interface definition and control. This manual can be used to improve planned or existing interface control processes during system design and development. It can also be used to refresh and update the corporate knowledge base. The information presented herein will reduce the amount of paper and data required in interface definition and control processes by as much as 50 percent and will shorten the time required to prepare an interface control document. It also highlights the essential technical parameters that ensure that flight subsystems will indeed fit together and function as intended after assembly and checkout.

  1. Environmental Hazards Assessment Program annual report, [June 1992--June 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    This report, the Environment Hazards Assessment Program (EHAP) Annual Report, is the second of three reports that document activities under the EHAP grant and details progress made during the first year of the grant. The first year was devoted to the development of a working program implementation plan. During the developmental process some key objectives were achieved such as developing a Doctor of Philosophy degree program in Environmental Studies at MUSC (Medical University of South Carolina) and conducting the first Crossroads of Humanity series Round Table Forum. The PIP (Program Implementation Program) details the objectives, management and budgetary basis formore » the overall management and control of the grant over the next four years, the yearly program plans provide the monthly and day-to-day programmatic and budgetary control by which the PIP was developed.« less

  2. 40 CFR 35.2050 - Effect of approval or certification of documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...

  3. Preliminary analysis of an integrated logistics system for OSSA payloads. Volume 3: OSSA integrated logistics support planning document

    NASA Technical Reports Server (NTRS)

    Palguta, T.; Bradley, W.; Stockton, T.

    1988-01-01

    Guidance in preparing and updating an integrated logistics support plan (ILSP) is given. Clear, concise, and detailed instructions are provided on the preparation and content of an ILSP in order to ensure a quality document that reflects total program requirements.

  4. IPPF Co-operative Information Service (ICIS). February 1978.

    ERIC Educational Resources Information Center

    International Planned Parenthood Federation, London (England).

    This publication is a catalogue of document descriptions that may be of use to national family planning/population organizations. The International Planned Parenthood Federation (IPPF) Cooperative Information Service (ICIS) has developed this quarterly series as a service to population documentation centers so that these centers can acquire the…

  5. Prostate Dose Escalation by Innovative Inverse Planning-Driven IMRT

    DTIC Science & Technology

    2005-11-01

    Galvin, J. M.; Low, D.; Palta , J. R.; Rosen, I.; Sharpe, M. B.; Xia, P.; Xiao, Y.; Xing, L.; Yu, C. X., Guidance document on delivery, treatment planning... Palta , J., Implementing IMRT in clinical practice: ajoint document of the American Society for Therapeutic Radiology and Oncology and the American

  6. 45 CFR 307.15 - Approval of advance planning documents for computerized support enforcement systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... computerized support enforcement systems. 307.15 Section 307.15 Public Welfare Regulations Relating to Public... CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES COMPUTERIZED SUPPORT ENFORCEMENT SYSTEMS § 307.15 Approval of advance planning documents for computerized support enforcement systems. (a...

  7. Environmental Scan: A Strategic Planning Document.

    ERIC Educational Resources Information Center

    Osborn, Frances

    Information, perceptions, and predictions from a variety of sources are brought together in this document to help guide planning and decision making at Monroe Community College (MCC). The first section examines national events and trends with implications for the future of MCC, including employment projections; educational norms; data on community…

  8. Comprehensive Planning Resource Document, 1990-91, for the Kern Community College District.

    ERIC Educational Resources Information Center

    Cook, Lauraine

    This compilation of resources for district planning in 1990-91 provides an overview of demographic, personnel, financial, facilities, and curriculum issues for the Kern Community College District (California) and its member institutions, Bakersfield, Cerro Coso, and Porterville colleges. The 10 sections of the document cover: (1) General…

  9. A Business Plan Outline.

    ERIC Educational Resources Information Center

    Kirchner, Charles, Ed.

    This document identifies the information that should be included in a business plan, and in what order, to make it an effective management tool and an effective tool to communicate a proposed or existing company's strengths and potential to potential financiers. Following an introduction, the document explains the following sections of a business…

  10. The Effects of Structured Health Policy Education on Connecticut Registered Nurses' Clinical Documentation

    ERIC Educational Resources Information Center

    Lobo, Rosale Constance

    2017-01-01

    Registered Nurses use clinical documentation to describe care planning processes, measure quality outcomes, support reimbursement, and defend litigation. The Connecticut Department of Health, guided by federal Conditions of Participation, defines state-level healthcare policy to include required care planning processes. Nurses are educated in care…

  11. NOAA Office of Exploration and Research > Education > NOAA Initiatives

    Science.gov Websites

    Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Evaluation Education NOAA Initiatives Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan 2014 Funding Opportunities Contact Us Program

  12. NOAA Office of Exploration and Research > Education > Alliance Partners

    Science.gov Websites

    Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Evaluation Education Alliance Partners Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan 2014 Funding Opportunities Contact Us Program

  13. 78 FR 64970 - New Deadlines for Public Comment on Draft Environmental Documents

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ... interested parties to contact Service personnel and Web sites for information about these draft documents. As..., fdsys/pkg/FR-2013- CO; Comprehensive Conservation 08-07/pdf/2013- Plan and Environmental Impact 19052.pdf. Statement; Two Ponds National Wildlife Refuge, Arvada, CO; Comprehensive Conservation Plan and...

  14. Data Quality Objectives for Tank Farms Waste Compatibility Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BANNING, D.L.

    1999-07-02

    There are 177 waste storage tanks containing over 210,000 m{sup 3} (55 million gal) of mixed waste at the Hanford Site. The River Protection Project (RPP) has adopted the data quality objective (DQO) process used by the U.S. Environmental Protection Agency (EPA) (EPA 1994a) and implemented by RPP internal procedure (Banning 1999a) to identify the information and data needed to address safety issues. This DQO document is based on several documents that provide the technical basis for inputs and decision/action levels used to develop the decision rules that evaluate the transfer of wastes. A number of these documents are presentlymore » in the process of being revised. This document will need to be revised if there are changes to the technical criteria in these supporting documents. This DQO process supports various documents, such as sampling and analysis plans and double-shell tank (DST) waste analysis plans. This document identifies the type, quality, and quantity of data needed to determine whether transfer of supernatant can be performed safely. The requirements in this document are designed to prevent the mixing of incompatible waste as defined in Washington Administrative Code (WAC) 173-303-040. Waste transfers which meet the requirements contained in this document and the Double-Shell Tank Waste Analysis Plan (Mulkey 1998) are considered to be compatible, and prevent the mixing of incompatible waste.« less

  15. Journey to 2030 : transportation plan of the Boston region metropolitan planning organization.

    DOT National Transportation Integrated Search

    2007-06-28

    JOURNEY to 2030, the Transportation Plan of the Boston Region Metropolitan Planning Organization (referred to as the Plan), is the long-range, comprehensive transportation planning document for the Boston region. The region encompasses 101 cities and...

  16. Orbital service module systems analysis study documentation. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Potentially feasible system concepts for providing additional power, thermal control, and attitude to the baseline orbiter were investigated in order to support a greater variety of space missions and to extend the orbiter's ability to remain in orbit. Results of these analyses include an incremental growth plan that offers the flexibility of adding capability as, and when, it is needed in order to satisfy emerging user requirements.

  17. Proceedings for the Advance Planning Briefing for Industry

    DTIC Science & Technology

    1990-01-24

    Liaison Office TOD - Technical Objective Documents TSR - Tactical Source Region UAV - Unmanned Aerial Vehicle UGT - UnderGround nuclear Test A G.EN D635I...tests in AURORA and underground nuclear tests ( UGT ) and will help develop tactical source region hardening requirements and lead to approaches for TSR...X-Ray theory , lasers, electronic controllers, computers, robotics, etc. Contracting for scientific studies and one-of-a-kind machines will emphasize

  18. ICESat (GLAS) Science Processing Software Document Series. Volume 2; Science Data Management Plan; 4.0

    NASA Technical Reports Server (NTRS)

    Jester, Peggy L.; Hancock, David W., III

    1999-01-01

    This document provides the Data Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Facility (ISF) Software. This Plan addresses the identification, authority, and description of the interface nodes associated with the GLAS Standard Data Products and the GLAS Ancillary Data.

  19. Work Plan of APEID for the Fifth Programming Cycle, 1992-1996. A Report of the APEID Programme Development Meeting (Chiang Mai, Thailand, August 28-31, 1990).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This document is a work plan for the UNESCO Asia and the Pacific Programme of Educational Innovation for Development (APEID) for the period 1992 through 1996. The plan provides a general framework for APEID, including a formulation of annual schedules of activities with due regard to available resources and funding. The document discusses three…

  20. Iowa in motion : transit system plan : implementing Iowa's state transportation plan

    DOT National Transportation Integrated Search

    1999-09-14

    The Iowa Transit System Plan was developed as a result of the on-going long-range transportation planning process known as Iowa In Motion This planning document, the 1999 Iowa Transit System Plan, is the result of this continuing planning process and...

  1. 36 CFR 219.54 - Filing an objection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... or regulation. (2) Forest Service Directive System documents and land management plans or other... the objection process. (b) Including documents by reference is not allowed, except for the following... relevant section of the cited document. All other documents or Web links to those documents, or both must...

  2. 36 CFR 219.54 - Filing an objection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or regulation. (2) Forest Service Directive System documents and land management plans or other... the objection process. (b) Including documents by reference is not allowed, except for the following... relevant section of the cited document. All other documents or Web links to those documents, or both must...

  3. Amendments to Summary Plan Description regulations. Pension and Welfare Benefits Administration, Labor. Final rule.

    PubMed

    2000-11-21

    This document contains a final rule amending the regulations governing the content of the Summary Plan Description (SPD) required to be furnished to employee benefit plan participants and beneficiaries under the Employee Retirement Income Security Act of 1974, as amended (ERISA). These amendments implement information disclosure recommendations of the President's Advisory Commission on Consumer Protection and Quality in the Health Care Industry, as set forth in their November 20, 1997, report, "Consumer Bill of Rights and Responsibilities." Specifically, the amendments clarify benefit, medical provider, and other information required to be disclosed in, or as part of, the SPD of a group health plan and repeal the limited exemption with respect to SPDs of welfare plans providing benefits through qualified health maintenance organizations (HMOs). In addition, this document contains several amendments updating and clarifying provisions relating to the content of SPDs that affect both pension and welfare benefit plans. This document also adopts in final form certain regulations that were effective on an interim basis implementing amendments to ERISA enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). This final rule will affect employee pension and welfare benefit plans, including group health plans, as well as administrators, fiduciaries, participants and beneficiaries of such plans.

  4. HALE UAS Command and Control Communications: Step 1 - Functional Requirements Document. Version 4.0

    NASA Technical Reports Server (NTRS)

    2006-01-01

    The High Altitude Long Endurance (HALE) unmanned aircraft system (UAS) communicates with an off-board pilot-in-command in all flight phases via the C2 data link, making it a critical component for the UA to fly in the NAS safely and routinely. This is a new requirement in current FAA communications planning and monitoring processes. This document provides a set of comprehensive C2 communications functional requirements and performance guidelines to help facilitate the future FAA certification process for civil UAS to operate in the NAS. The objective of the guidelines is to provide the ability to validate the functional requirements and in future be used to develop performance-level requirements.

  5. Design of a modular digital computer system, CDRL no. D001, final design plan

    NASA Technical Reports Server (NTRS)

    Easton, R. A.

    1975-01-01

    The engineering breadboard implementation for the CDRL no. D001 modular digital computer system developed during design of the logic system was documented. This effort followed the architecture study completed and documented previously, and was intended to verify the concepts of a fault tolerant, automatically reconfigurable, modular version of the computer system conceived during the architecture study. The system has a microprogrammed 32 bit word length, general register architecture and an instruction set consisting of a subset of the IBM System 360 instruction set plus additional fault tolerance firmware. The following areas were covered: breadboard packaging, central control element, central processing element, memory, input/output processor, and maintenance/status panel and electronics.

  6. U.S. Geological Survey quality-assurance plan for continuous water-quality monitoring in Kansas, 2014

    USGS Publications Warehouse

    Bennett, Trudy J.; Graham, Jennifer L.; Foster, Guy M.; Stone, Mandy L.; Juracek, Kyle E.; Rasmussen, Teresa J.; Putnam, James E.

    2014-01-01

    A quality-assurance plan for use in conducting continuous water-quality monitoring activities has been developed for the Kansas Water Science Center in accordance with guidelines set forth by the U.S. Geological Survey. This quality-assurance plan documents the standards, policies, and procedures used by the U.S. Geological Survey in Kansas for activities related to the collection, processing, storage, analysis, and release of continuous water-quality monitoring data. The policies and procedures that are documented in this quality-assurance plan for continuous water-quality monitoring activities complement quality-assurance plans for surface-water and groundwater activities in Kansas.

  7. Quality-assurance and data-management plan for water-quality activities in the Kansas Water Science Center, 2014

    USGS Publications Warehouse

    Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.

    2014-01-01

    As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.

  8. Quality-assurance plan for water-quality activities in the U.S. Geological Survey Washington Water Science Center

    USGS Publications Warehouse

    Conn, Kathleen E.; Huffman, Raegan L.; Barton, Cynthia

    2017-05-08

    In accordance with guidelines set forth by the Office of Water Quality in the Water Mission Area of the U.S. Geological Survey, a quality-assurance plan has been created for use by the Washington Water Science Center (WAWSC) in conducting water-quality activities. This qualityassurance plan documents the standards, policies, and procedures used by the WAWSC for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures documented in this quality-assurance plan for water-quality activities complement the quality-assurance plans for surface-water and groundwater activities at the WAWSC.

  9. Human Factors Engineering Program Review Model (NUREG-0711)Revision 3: Update Methodology and Key Revisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OHara J. M.; Higgins, J.; Fleger, S.

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodicmore » update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. NUREG-0711 is the first document to be addressed. We present the methodology used to update NUREG-0711 and summarize the main changes made. Finally, we discuss the current status of the update program and the future plans.« less

  10. Kennedy Space Center Florida Scrub-Jay Compensation Plan

    NASA Technical Reports Server (NTRS)

    Pitcock, Taylor Morgan (Compiler)

    2014-01-01

    Many organizations have interest in using NASA property on KSC. The purpose of this document is to consolidate the goals of ecosystem management associated with Florida Scrub-Jays and compliance with the Endangered Species Act (ESA) in order to streamline and reduce the costs of facility planning, impact assessment, and impact minimization. This will simplify the process and reduce regulatory uncertainty.However, the resulting process must be consistent with the Merritt Island National Wildlife Refuge (MINWR) Comprehensive Conservation Plan (CCP). In addition, this document considers anticipated construction impacts on KSC during the next 10 years and summarizes priorities in a spatially explicit manner. The document describes anticipated compensation requirements to facilitate restoration of degraded habitat in areas most important to the KSC Scrub-Jay population through resources provided to MINWR. The plan assumes that all construction on KSC is compensated on KSC.

  11. Your cancer survivorship care plan

    MedlinePlus

    ... ency/patientinstructions/000822.htm Your cancer survivorship care plan To use the sharing features on this page, ... get one. What Is a Cancer Survivorship Care Plan? A cancer survivorship care plan is a document ...

  12. Space station thermal control surfaces. [space radiators

    NASA Technical Reports Server (NTRS)

    Maag, C. R.; Millard, J. M.; Jeffery, J. A.; Scott, R. R.

    1979-01-01

    Mission planning documents were used to analyze the radiator design and thermal control surface requirements for both space station and 25-kW power module, to analyze the missions, and to determine the thermal control technology needed to satisfy both sets of requirements. Parameters such as thermal control coating degradation, vehicle attitude, self eclipsing, variation in solar constant, albedo, and Earth emission are considered. Four computer programs were developed which provide a preliminary design and evaluation tool for active radiator systems in LEO and GEO. Two programs were developed as general programs for space station analysis. Both types of programs find the radiator-flow solution and evaluate external heat loads in the same way. Fortran listings are included.

  13. First Steps in Government Documents: A Basic Guide.

    ERIC Educational Resources Information Center

    Sears, Jean L.; Moody, Marilyn K.

    Designed to aid users in locating materials in the government documents department at Miami University in Oxford Ohio, this guide contains general information on the documents collection, a floor plan of the documents department, an introduction to U.S. government document finding aids, an introduction to U.S. Congressional and legislative…

  14. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  15. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Johnson, Jill W. (Compiler)

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

  16. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  17. Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)

    NASA Astrophysics Data System (ADS)

    Selvy, Brian M.; Claver, Charles; Angeli, George

    2014-08-01

    This paper provides an overview of the tool, language, and methodology used for Verification and Validation Planning on the Large Synoptic Survey Telescope (LSST) Project. LSST has implemented a Model Based Systems Engineering (MBSE) approach as a means of defining all systems engineering planning and definition activities that have historically been captured in paper documents. Specifically, LSST has adopted the Systems Modeling Language (SysML) standard and is utilizing a software tool called Enterprise Architect, developed by Sparx Systems. Much of the historical use of SysML has focused on the early phases of the project life cycle. Our approach is to extend the advantages of MBSE into later stages of the construction project. This paper details the methodology employed to use the tool to document the verification planning phases, including the extension of the language to accommodate the project's needs. The process includes defining the Verification Plan for each requirement, which in turn consists of a Verification Requirement, Success Criteria, Verification Method(s), Verification Level, and Verification Owner. Each Verification Method for each Requirement is defined as a Verification Activity and mapped into Verification Events, which are collections of activities that can be executed concurrently in an efficient and complementary way. Verification Event dependency and sequences are modeled using Activity Diagrams. The methodology employed also ties in to the Project Management Control System (PMCS), which utilizes Primavera P6 software, mapping each Verification Activity as a step in a planned activity. This approach leads to full traceability from initial Requirement to scheduled, costed, and resource loaded PMCS task-based activities, ensuring all requirements will be verified.

  18. Integrating MRP (materiel requirements planning) II and JIT to achieve world-class status.

    PubMed

    Titone, R C

    1994-05-01

    The concepts and principles of using manufacturing resource planning (MRP II) for planning are not new. Their success has been proven in numerous manufacturing companies in America. The concepts and principles of using just-in-time (JIT) inventory for execution, while more recent, have also been available for some time, and their success in Japan well documented. However, it is the effective integration of these two powerful tools that open the way to achieving world-class manufacturing status. This article will utilize a newly developed world-class manufacturing model, which will review the aspects of planning, beginning with a business plan through the production planning process and culminating with a master schedule that drives a materiel/capacity plan. The importance and interrelationship of these functions are reviewed. The model then illustrates the important aspects of executing these plans beginning with people issues, through total quality control (TQC) and pull systems. We will then utilize this new functional model to demonstrate the relationship between these various functions and the importance of integrating them with a total comprehensive manufacturing strategy that will lead to world-class manufacturing and profits.

  19. Management, Planning, and Monitoring Population Education Programmes. Abstract-Bibliography Series 8.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…

  20. Common Ground: Agriculture for a Sustainable Future. Lesson Plans.

    ERIC Educational Resources Information Center

    Selfridge, Deborah J.

    This document contains lesson plans for a four-unit course in agriculture for sustainable development and is accompanied by a video tape and a booklet that discusses existing and future agricultural practices. Each unit of the document contains some or all of the following components: an introduction; objectives and competencies addressed; a list…

  1. 77 FR 8892 - Detailed Planning To Consider Additional Land Protection on the Missouri River From Fort Randall...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... governments, and the public of our intentions and to obtain suggestions and information on the scope of issues to include in the environmental documents. Special mailings, newspaper articles, and other media... information necessary to complete detailed planning and prepare associated documents under the National...

  2. 78 FR 46532 - Airworthiness Directives; the Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... capability on one engine, and in-flight shutdown of the engine. This action revises that NPRM by proposing to... maintenance planning data (MPD) document, and to remove airplanes from the applicability. We are proposing... Planning Data (MPD) Document. Among other things, Section 9 describes AWL No. 28-AWL-101, Engine Fuel...

  3. 42 CFR 137.365 - What is the procedure for the Secretary's review and approval of project planning and design...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the...-Governance Tribe? (a) The Secretary shall review and approve planning documents to ensure compliance with... design documents for general compliance with requirements of the construction project agreement. (b) The...

  4. Cabrillo College Master Plan, 2001-2004.

    ERIC Educational Resources Information Center

    Cabrillo Coll., Aptos, CA. Office of Institutional Research.

    This document presents Cabrillo College's (California) master plan for 2001 to 2004. Major steps in compiling the master plan included: conducting environmental scanning, making planning assumptions, establishing goals, identifying objectives, developing strategies, and evaluating the plan. The plan is based on six broad goals: (1) to enable…

  5. Uniform Federal Policy for Quality Assurance Project Plans: Evaluating, Assessing, and Documenting Environmental Data Collection and Use Programs. Part 1. UFP-QAPP Manual

    DTIC Science & Technology

    2004-07-01

    sampler, project manager, data reviewer, statistician , risk assessor, assessment personnel, and laboratory QC manager. In addition, a complete copy of...sample • Corrective actions to be taken if the QC sample fails these criteria • A description of how the QC data and results are to be documented and...Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans Evaluating, Assessing, and Documenting

  6. Public health foundations and the tobacco industry: lessons from Minnesota

    PubMed Central

    Ibrahim, J; Tsoukalas, T; Glantz, S

    2004-01-01

    Objective: To investigate whether private foundations can be created in a way that will insulate them from attacks by the tobacco industry, using the Minnesota Partnership for Action Against Tobacco (MPAAT) as a case study. Design: Information was collected from internal tobacco industry documents, court documents, newspapers, and interviews with health advocates and elected officials. Results: The creation of MPAAT as an independent foundation did not insulate it from attacks by tobacco industry allies. During 2001–2002, MPAAT was repeatedly attacked by Attorney General Mike Hatch and major media, using standard tobacco industry rhetoric. This strategy of attack and demands for information were reminiscent of previous attacks on Minnesota's Plan for Nonsmoking and Health and the American Stop Smoking Intervention Study (ASSIST). MPAAT was ultimately forced to restructure its programme to abandon effective community norm change interventions around smoke-free policies and replace them with less effective individual cessation interventions. Neither MPAAT nor other health advocates mounted an effective public response to these attacks, instead relying on the insider strategy of responding in court. Conclusion: It is not possible to avoid attacks by the tobacco industry or its political allies. Like programmes administered by government agencies, tobacco control foundations must be prepared for these attacks, including a proactive plan to educate the public about the principles of community based tobacco control. Public health advocates also need to be willing to take prompt action to defend these programmes and hold public officials who attack tobacco control programmes accountable for their actions. PMID:15333877

  7. Miami Valley ITS : early deployment plan : final user service plan

    DOT National Transportation Integrated Search

    1997-07-01

    This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...

  8. Arkansas statewide long-range intermodal transportation plan 2007 update

    DOT National Transportation Integrated Search

    2007-01-01

    This Arkansas Statewide Long-Range Intermodal Transportation Plan (2007 Long- Range Plan) is the third long-range plan approved by the Arkansas Highway Commission. The first plan was approved in February 1995 followed by the second document in May 20...

  9. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less

  10. Bay Delta Conservation Plan / California WaterFix Documents

    EPA Pesticide Factsheets

    EPA is working with state and federal agencies on development of the Bay Delta Conservation Plan (BDCP), a habitat conservation plan. This page contains correspondence commenting on BDCP planning by state and federal agencies.

  11. Use of Video Decision Aids to Promote Advance Care Planning in Hilo, Hawai'i.

    PubMed

    Volandes, Angelo E; Paasche-Orlow, Michael K; Davis, Aretha Delight; Eubanks, Robert; El-Jawahri, Areej; Seitz, Rae

    2016-09-01

    Advance care planning (ACP) seeks to promote care delivery that is concordant with patients' informed wishes. Scalability and cost may be barriers to widespread ACP, and video decision aids may help address such barriers. Our primary hypothesis was that ACP documentation would increase in Hilo after ACP video implementation. Secondary hypotheses included increased use of hospice, fewer deaths in the hospital, and decreased costs in the last month of life. The city of Hilo in Hawai'i (population 43,263), which is served by one 276-bed hospital (Hilo Medical Center), one hospice (the Hospice of Hilo), and 30 primary care physicians. The intervention consisted of a single, 1- to 4-h training and access to a suite of ACP video decision aids. Prior to implementation, the rate of ACP documentation for hospitalized patients with late-stage disease was 3.2 % (11/346). After the intervention, ACP documentation was 39.9 % (1,107/2,773) (P < 0.001). Primary care providers in the intervention had an ACP completion rate for patients over 75 years of 37.0 % (1,437/3,888) compared to control providers, who had an average of 25.6 % (10,760/42,099) (P < 0.001). The rate of discharge from hospital to hospice for patients with late-stage disease was 5.7 % prior to the intervention and 13.8 % after the intervention (P < 0.001). The average total insurance cost for the last month of life among Hilo patients was $3,458 (95 % CI $3,051 to 3,865) lower per patient after the intervention when compared to the control region. Implementing ACP video decision aids was associated with improved ACP documentation, greater use of hospice, and decreased costs. Decision aids that promote ACP offer a scalable and cost-efficient medium to place patients at the center of their care.

  12. 40 CFR 310.16 - What kind of cost documentation is necessary?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS REIMBURSEMENT TO LOCAL GOVERNMENTS FOR... cost documentation is necessary? Cost documentation must be adequate for an audit. At a minimum, you...

  13. Trade study plan for Graphite Composite Primary Structure (GCPS)

    NASA Technical Reports Server (NTRS)

    Greenberg, H. S.

    1994-01-01

    This TA 2 document (with support from TA 1) describes the trade study plan that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination For this most suitable configuration the structural attachment of the wing, and the most suitable GCPS composite materials for intertank, wing, tail and thrust structure are identified. This trade study analysis uses extensive information derived in the TA 1 trade study plan and is identified within the study plan. In view of this, for convenience, the TA 1 study plan is included as an appendix to this document.

  14. Environmental health discipline science plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in environmental health. It covers the significant research areas critical to NASA's programmatic requirements for the Extended Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; animal and human subjects; and research and development. This document summarizes the history and current status of the program elements, outlines available knowledge, establishes goals and objectives, identifies scientific priorities, and defines critical questions in the three disciplines: (1) Barophysiology, (2) Toxicology, and (3) Microbiology. This document contains a general plan that will be used by both NASA Headquarters Program Officers and the field centers to review and plan basic, applied, and operational research and development activities, both intramural and extramural, in this area. The document is divided into sections addressing these three disciplines.

  15. NASA strategic plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.

  16. [3-dimensional imaging systems: first experience in planning and documentation of plastic surgery procedures].

    PubMed

    Spanholtz, T A; Leitsch, S; Holzbach, T; Volkmer, E; Engelhardt, T; Giunta, R E

    2012-08-01

    A reproducible 3-dimensional photographic system enables plastic surgeons to perform preoperative planning and helps them to understand the patient's expectations. There are a few systems available that allow a reproducible 3-dimensional scans of the patient with direct simulation of the planned procedure. The Vectra Volumetric 3D Surface Imaging® by Canfield® provides such an option and helps the surgeons to document and compare postoperative changes at different time points. Since January 2011 we are digitally documenting all patients receiving form-modulating procedures in our plastic surgery unit. We present the spectrum of clinical implications and discuss advantages and disadvantages of the system. Furthermore, we have studied the accuracy of the system in comparison to direct measurement in 15 volunteers. The system is especially suited for planning and evaluation of breast augmentation, facial aesthetic and reconstructive surgery as well as volumetric measurements before and after liposuction and lipofilling. Computer-assisted measurements correlate with a median deviation of 2.3% with manually measured distances in the face. We found the user-friendly Vectra® system to be a reliable and reproducible device for planning plastic surgery therapies and for documenting postoperative results. © Georg Thieme Verlag KG Stuttgart · New York.

  17. Cost Effective, Ultra Sensitive Groundwater Monitoring for Site Remediation and Management: Standard Operating Procedures with QA/QC

    DTIC Science & Technology

    2015-05-01

    in consultation with the site management . 4.0 DATA TYPES AND QUALITY CONTROL A sampling plan must account for the collection, handling, and...GUIDANCE DOCUMENT Cost-Effective, Ultra-Sensitive Groundwater Monitoring for Site Remediation and Management : Standard Operating Procedures...Groundwater Monitoring for Site Remediation and Management 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Halden, R.U., Roll, I.B. 5d

  18. Kernel ADA Programming Support Environment (KAPSE) Interface Team Public Report. Volume 4.

    DTIC Science & Technology

    1984-04-30

    the document until further discussion has taken place among the group metbers. RACWG announced their editor, Reed Kotler . The RACWG plans to narrow...KRUTAR, Rudy NRL *LAPLANT, Bill HQ USAF LOPER, Warren NOSC *MAGLIERI, Lucas Canadian National Defense HQ MILLER, Jo NWC MYERS, Gil NOSC *MYERS, Philip ...HUMPHREY, Dianna Control Data Corp. JOHNSON, Ron Boeing Aerospace Co. KERNER, Judy Norden Systems KOTLER , Reed Lockheed Missiles & Space LAMB, J. Eli

  19. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  20. 48 CFR 11.101 - Order of precedence for requirements documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (2) Performance-oriented documents (e.g., a PWS or SOO). (See 2.101.) (3) Detailed design-oriented... requirements documents. 11.101 Section 11.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 11...

  1. IAC level "O" program development

    NASA Technical Reports Server (NTRS)

    Vos, R. G.

    1982-01-01

    The current status of the IAC development activity is summarized. The listed prototype software and documentation was delivered, and details were planned for development of the level 1 operational system. The planned end product IAC is required to support LSST design analysis and performance evaluation, with emphasis on the coupling of required technical disciplines. The long term IAC effectively provides two distinct features: a specific set of analysis modules (thermal, structural, controls, antenna radiation performance and instrument optical performance) that will function together with the IAC supporting software in an integrated and user friendly manner; and a general framework whereby new analysis modules can readily be incorporated into IAC or be allowed to communicate with it.

  2. Explanation of Change (EoC) Study: Approach and Findings

    NASA Technical Reports Server (NTRS)

    Bitten, Robert E.; Emmons, Debra L.; Bordi, Francesco; Scolese, Christopher

    2013-01-01

    This study investigated thirty historical NASA science missions to explain the cost change experienced. The study included investigation of historical milestone and monthly status report documentation followed by interviews with key project personnel. Based on the information collected, the reasons for cost change were binned, at the highest level, into four separate categories: NASA External, Project External, Internal Planning, and Internal Execution. The results identified that roughly a third of the change is outside of the project's control, a third is due to assumptions made in project planning, and a third is due to the inherent difficulty of building highly complex, one-of-a-kind, cutting edge, Earth and space science missions.

  3. Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

  4. Best practices of rural and statewide ITS strategic planning

    DOT National Transportation Integrated Search

    2002-07-01

    The "Best Practices of Rural and Statewide ITS Strategic Planning" document investigates the transferability of rural and statewide ITS planning efforts to other locations and provides "lessons learned" during the ITS planning process in many locatio...

  5. Remotely Operated Aircraft (ROA) Impact on the National Airspace System (NAS) Work Package: Automation Impacts of ROA's in the NAS

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The purpose of this document is to analyze the impact of Remotely Operated Aircraft (ROA) operations on current and planned Air Traffic Control (ATC) automation systems in the En Route, Terminal, and Traffic Flow Management domains. The operational aspects of ROA flight, while similar, are not entirely identical to their manned counterparts and may not have been considered within the time-horizons of the automation tools. This analysis was performed to determine if flight characteristics of ROAs would be compatible with current and future NAS automation tools. Improvements to existing systems / processes are recommended that would give Air Traffic Controllers an indication that a particular aircraft is an ROA and modifications to IFR flight plan processing algorithms and / or designation of airspace where an ROA will be operating for long periods of time.

  6. Louisiana Annual Special Education Program Plan. P.L. 94-142, Part B. Fiscal Years 1984-86. Bulletin 1715.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Div. of Special Education.

    The document specifies Louisiana's plan for special education in fiscal years 1984-86 as required by P.L. 94-142, The Education for All Handicapped Children Act. The document lists policies, procedures, and descriptions of the state's special education efforts, including the full educational opportunities goal, child identification, individualized…

  7. 45 CFR 261.61 - How must a State document a work-eligible individual's hours of participation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... individual who is self-employed, the documentation must comport with standards set forth in the State's approved Work Verification Plan. Self-reporting by a participant without additional verification is not... case file. In accordance with § 261.62, a State must describe in its Work Verification Plan the...

  8. Asset Management Plans, Appraisal Guidance for 2003-04.

    ERIC Educational Resources Information Center

    Department for Education and Skills, London (England).

    This document is one in a series which aims to assist Local Authorities in Britain with asset management planning (AMPs) for schools. AMPs set out the information needed, and the criteria used, to make decisions about spending on school premises. The document provides guidance on the appraisal of school AMPs in 2002 to inform 3-year formulaic…

  9. Documentation of a Collaborative Transition Planning System: A Curriculum Planning Guide for Students with Mild Disabilities.

    ERIC Educational Resources Information Center

    Jackson, Jeanne

    This report describes and analyzes the transition process used at Savanna High School, Anaheim, California, and documents the unique contribution of the school's Independent Living Skills Transition Center. The report's seven sections focus on: (1) transition definitions and the need for a shared definition among agency personnel; (2) team…

  10. Documentation for Students in Residential Care: Network of Relations of Human and Non-Human Actants

    ERIC Educational Resources Information Center

    Severinsson, Susanne

    2016-01-01

    Swedish and international research points to serious problems for the education of students with social, emotional and behavioural difficulties (SEBD) in the care of social welfare, for example, in residential care. The aim of this article is to elucidate how documentation, care plans (CPs) and individual educational plans (IEPs) outline the…

  11. 78 FR 51754 - Request To Modify License by Replacing Security Plan With New Radiation Safety Plan; U.S...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... by the presiding officer that the filing demonstrates good cause by satisfying the three factors in... documents over the Internet, or in some cases to mail copies on electronic storage media. Participants may... holidays. Participants who believe that they have a good cause for not submitting documents electronically...

  12. Patient Activities Planning and Progress Noting a Humanistic Integrated-Team Approach.

    ERIC Educational Resources Information Center

    Muilenburg, Ted

    This document outlines a system for planning recreation therapy, documenting progress, and relating the entire process to a team approach which includes patient assessment and involvement. The recreation program is seen as therapeutic, closely related to the total medical treatment program. The model is designed so that it can be adapted to almost…

  13. 'Take Ten' improving the surgical post-take ward round: a quality improvement project.

    PubMed

    Banfield, Danielle Alice; Adamson, Carly; Tomsett, Amy; Povey, James; Fordham, Tony; Richards, Sarah Kathryn

    2018-01-01

    The surgical post-take ward round is a complex multidisciplinary interaction in which new surgical patients are reviewed and management plans formulated. Its fast-paced nature can lead to poor communication and inaccurate or incomplete documentation with potential detriment to patient safety. Junior team members often do not fully understand the diagnosis and management plan. The aims of this project were to improve both communication and documentation on the surgical post-take ward round, influencing patient safety. The ward round was deconstructed to identify individual roles and determine where intervention would have the most impact. Ten important points were identified that should be documented in the management of an acute surgical patient; observations, examination, impression, investigations, antibiotics, intravenous fluids, VTE assessment, nutrition status, estimated length of stay and ceiling of treatment. A 'Take Ten' checklist was devised with these items to be used as a 'time out' after each patient with the whole team for discussion, clarification and clear documentation. Four plan do study act cycles were completed over a period of a year. A retrospective review of post-take documentation preintervention and postintervention was performed, and the percentage of points that were accurately documented was calculated. For further clarification, 2 weekends were compared-one where the checklist was used and one where it was not. Results showed documentation postintervention varied between categories but there was improvement in documentation of VTE assessment, fluids, observations and investigations. On direct comparison of weekends the checklist showed improved documentation in all categories except length of stay. Junior team members found the checklist improved understanding of diagnosis and management plan, and encouraged a more effective ward round. The 'Take Ten' checklist has been well received. Three years on from its inception, the checklist has become an integral part of the post-take ward round, thanks to the multidisciplinary engagement in the project.

  14. An Audit of Nursing Documentation at Three Public Hospitals in Jamaica.

    PubMed

    Lindo, Jascinth; Stennett, Rosain; Stephenson-Wilson, Kayon; Barrett, Kerry Ann; Bunnaman, Donna; Anderson-Johnson, Pauline; Waugh-Brown, Veronica; Wint, Yvonne

    2016-09-01

    Nursing documentation provides an important indicator of the quality of care provided for hospitalized patients. This study assessed the quality of nursing documentation on medical wards at three hospitals in Jamaica. This cross-sectional study audited a multilevel stratified sample of 245 patient records from three type B hospitals. An audit instrument which assessed nursing documentation of client history, biological data, client assessment, nursing standards, discharge planning, and teaching facilitated data collection. Descriptive statistics were conducted using IBM SPSS, Version 19 (IBM Inc., Armonk, NY, USA). Records from three hospitals (Hospital 1, n = 119, 48.6%; Hospital 2, n = 56, 22.9%; Hospital 3, n = 70, 28.6%) were audited. Documented evidence of the patient's chief complaint (81.6%), history of present illness (78.8%), past health (79.2%), and family health (11.0%) were noted; however, less than a third of the dockets audited recorded adequate assessment data (e.g., occupation or living accommodations of patients). The audit noted 90% of records had a physical assessment completed within 24 hr of admission and entries timed, dated, and signed by a nurse. Less than 5% of dockets had evidence of patient teaching, and 13.5% had documented evidence of discharge planning conducted within 72 hr of admission. This study highlights the weakness in nursing documentation and the need for increased training and continued monitoring of nursing documentation at the hospitals studied. Additional research regarding the factors that affect nursing documentation practice could prove useful. The study provides valuable information for the development of strategic risk management programs geared at improving the quality of care delivered to clients and presents an opportunity for nurse leaders to implement structured interventions geared at improving nursing documentation in Jamaica. In light of Jamaica's epidemiologic transition of chronic diseases, gaps in nurses' documentation of client assessment, patient teaching, and discharge planning should be addressed with urgency. Patient teaching and discharge planning enable the clients to participate more effectively in their health maintenance process. © 2016 Sigma Theta Tau International.

  15. ATLAS LTCS Vertically Challenged System Lessons Learned

    NASA Technical Reports Server (NTRS)

    Patel, Deepak; Garrison, Matt; Ku, Jentung

    2014-01-01

    Re-planning of LTCS TVAC testing and supporting RTA (Receiver Telescope Assembly) Test Plan and Procedure document preparation. The Laser Thermal Control System (LTCS) is designed to maintain the lasers onboard Advanced Topographic Laser Altimeter System (ATLAS) at their operational temperatures. In order to verify the functionality of the LTCS, a thermal balance test of the thermal hardware was performed. During the first cold start of the LTCS, the Loop Heat Pipe (LHP) was unable to control the laser mass simulators temperature. The control heaters were fully on and the loop temperature remained well below the desired setpoint. Thermal analysis of the loop did not show these results. This unpredicted behavior of the LTCS was brought up to a panel of LHP experts. Based on the testing and a review of all the data, there were multiple diagnostic performed in order to narrow down the cause. The prevailing theory is that gravity is causing oscillating flow within the loop, which artificially increased the control power needs. This resulted in a replan of the LTCS test flow and the addition of a GSE heater to allow vertical operation.

  16. Human movement data for malaria control and elimination strategic planning.

    PubMed

    Pindolia, Deepa K; Garcia, Andres J; Wesolowski, Amy; Smith, David L; Buckee, Caroline O; Noor, Abdisalan M; Snow, Robert W; Tatem, Andrew J

    2012-06-18

    Recent increases in funding for malaria control have led to the reduction in transmission in many malaria endemic countries, prompting the national control programmes of 36 malaria endemic countries to set elimination targets. Accounting for human population movement (HPM) in planning for control, elimination and post-elimination surveillance is important, as evidenced by previous elimination attempts that were undermined by the reintroduction of malaria through HPM. Strategic control and elimination planning, therefore, requires quantitative information on HPM patterns and the translation of these into parasite dispersion. HPM patterns and the risk of malaria vary substantially across spatial and temporal scales, demographic and socioeconomic sub-groups, and motivation for travel, so multiple data sets are likely required for quantification of movement. While existing studies based on mobile phone call record data combined with malaria transmission maps have begun to address within-country HPM patterns, other aspects remain poorly quantified despite their importance in accurately gauging malaria movement patterns and building control and detection strategies, such as cross-border HPM, demographic and socioeconomic stratification of HPM patterns, forms of transport, personal malaria protection and other factors that modify malaria risk. A wealth of data exist to aid filling these gaps, which, when combined with spatial data on transport infrastructure, traffic and malaria transmission, can answer relevant questions to guide strategic planning. This review aims to (i) discuss relevant types of HPM across spatial and temporal scales, (ii) document where datasets exist to quantify HPM, (iii) highlight where data gaps remain and (iv) briefly put forward methods for integrating these datasets in a Geographic Information System (GIS) framework for analysing and modelling human population and Plasmodium falciparum malaria infection movements.

  17. Human movement data for malaria control and elimination strategic planning

    PubMed Central

    2012-01-01

    Recent increases in funding for malaria control have led to the reduction in transmission in many malaria endemic countries, prompting the national control programmes of 36 malaria endemic countries to set elimination targets. Accounting for human population movement (HPM) in planning for control, elimination and post-elimination surveillance is important, as evidenced by previous elimination attempts that were undermined by the reintroduction of malaria through HPM. Strategic control and elimination planning, therefore, requires quantitative information on HPM patterns and the translation of these into parasite dispersion. HPM patterns and the risk of malaria vary substantially across spatial and temporal scales, demographic and socioeconomic sub-groups, and motivation for travel, so multiple data sets are likely required for quantification of movement. While existing studies based on mobile phone call record data combined with malaria transmission maps have begun to address within-country HPM patterns, other aspects remain poorly quantified despite their importance in accurately gauging malaria movement patterns and building control and detection strategies, such as cross-border HPM, demographic and socioeconomic stratification of HPM patterns, forms of transport, personal malaria protection and other factors that modify malaria risk. A wealth of data exist to aid filling these gaps, which, when combined with spatial data on transport infrastructure, traffic and malaria transmission, can answer relevant questions to guide strategic planning. This review aims to (i) discuss relevant types of HPM across spatial and temporal scales, (ii) document where datasets exist to quantify HPM, (iii) highlight where data gaps remain and (iv) briefly put forward methods for integrating these datasets in a Geographic Information System (GIS) framework for analysing and modelling human population and Plasmodium falciparum malaria infection movements. PMID:22703541

  18. 30 CFR 254.4 - May I reference other documents in my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST... documents, and Oil Spill Removal Organization (OSRO) documents that are readily accessible to the Regional...

  19. 30 CFR 254.4 - May I reference other documents in my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST... documents, and Oil Spill Removal Organization (OSRO) documents that are readily accessible to the Regional...

  20. 30 CFR 254.4 - May I reference other documents in my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST... documents, and Oil Spill Removal Organization (OSRO) documents that are readily accessible to the Regional...

  1. Where is the evidence for emergency planning: a scoping review.

    PubMed

    Challen, Kirsty; Lee, Andrew C K; Booth, Andrew; Gardois, Paolo; Woods, Helen Buckley; Goodacre, Steve W

    2012-07-23

    Recent terrorist attacks and natural disasters have led to an increased awareness of the importance of emergency planning. However, the extent to which emergency planners can access or use evidence remains unclear. The aim of this study was to identify, analyse and assess the location, source and quality of emergency planning publications in the academic and UK grey literature. We conducted a scoping review, using as data sources for academic literature Embase, Medline, Medline in Process, Psychinfo, Biosis, Science Citation Index, Cinahl, Cochrane library and Clinicaltrials.gov. For grey literature identification we used databases at the Health Protection Agency, NHS Evidence, British Association of Immediate Care Schemes, Emergency Planning College and the Health and Safety Executive, and the websites of UK Department of Health Emergency Planning Division and UK Resilience.Aggregative synthesis was used to analyse papers and documents against a framework based on a modified FEMA Emergency Planning cycle. Of 2736 titles identified from the academic literature, 1603 were relevant. 45% were from North America, 27% were commentaries or editorials and 22% were event reports.Of 192 documents from the grey literature, 97 were relevant. 76% of these were event reports.The majority of documents addressed emergency planning and response. Very few documents related to hazard analysis, mitigation or capability assessment. Although a large body of literature exists, its validity and generalisability is unclear There is little evidence that this potential evidence base has been exploited through synthesis to inform policy and practice. The type and structure of evidence that would be of most value of emergency planners and policymakers has yet to be identified.

  2. Site scientific mission plan for the Southern Great Plains CART site, January-June 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.

    1994-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less

  3. 25 CFR 170.401 - What is BIA's role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... maintenance facilities; and (p) Researching rights-of-way documents for project planning. ...

  4. FY 2016 - Stockpile Stewardship and Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  5. 75 FR 60759 - Enforcement Action Plan for Promotion and Advertising Restrictions; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...] Enforcement Action Plan for Promotion and Advertising Restrictions; Availability AGENCY: Food and Drug... availability of a document entitled ``Enforcement Action Plan for Promotion and Advertising Restrictions'' (Enforcement Action Plan), which describes FDA's plan to enforce the restrictions on promotion and advertising...

  6. 77 FR 48591 - State Rail Plan Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... Plan Guidance AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Request for Public Comment on Proposed State Rail Plan Guidance. SUMMARY: FRA is publishing this notice to... plans. State rail plans are documents that are required under Section 303 of the Passenger Rail...

  7. TU-AB-201-02: An Automated Treatment Plan Quality Assurance Program for Tandem and Ovoid High Dose-Rate Brachytherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tan, J; Shi, F; Hrycushko, B

    2015-06-15

    Purpose: For tandem and ovoid (T&O) HDR brachytherapy in our clinic, it is required that the planning physicist manually capture ∼10 images during planning, perform a secondary dose calculation and generate a report, combine them into a single PDF document, and upload it to a record- and-verify system to prove to an independent plan checker that the case was planned correctly. Not only does this slow down the already time-consuming clinical workflow, the PDF document also limits the number of parameters that can be checked. To solve these problems, we have developed a web-based automatic quality assurance (QA) program. Methods:more » We set up a QA server accessible through a web- interface. A T&O plan and CT images are exported as DICOMRT files and uploaded to the server. The software checks 13 geometric features, e.g. if the dwell positions are reasonable, and 10 dosimetric features, e.g. secondary dose calculations via TG43 formalism and D2cc to critical structures. A PDF report is automatically generated with errors and potential issues highlighted. It also contains images showing important geometric and dosimetric aspects to prove the plan was created following standard guidelines. Results: The program has been clinically implemented in our clinic. In each of the 58 T&O plans we tested, a 14- page QA report was automatically generated. It took ∼45 sec to export the plan and CT images and ∼30 sec to perform the QA tests and generate the report. In contrast, our manual QA document preparation tooks on average ∼7 minutes under optimal conditions and up to 20 minutes when mistakes were made during the document assembly. Conclusion: We have tested the efficiency and effectiveness of an automated process for treatment plan QA of HDR T&O cases. This software was shown to improve the workflow compared to our conventional manual approach.« less

  8. Clinical Workflow Observations to Identify Opportunities for Nurse, Physicians and Patients to Share a Patient-centered Plan of Care

    PubMed Central

    Collins, Sarah A.; Gazarian, Priscilla; Stade, Diana; McNally, Kelly; Morrison, Conny; Ohashi, Kumiko; Lehmann, Lisa; Dalal, Anuj; Bates, David W.; Dykes, Patricia C.

    2014-01-01

    Patient- and Family-Centered Care (PFCC) is essential for high quality care in the critical and acute-specialty care hospital setting. Effective PFCC requires clinicians to form an integrated interprofessional team to collaboratively engage with the patient/family and contribute to a shared patient-centered plan of care. We conducted observations on a critical care and specialty unit to understand the plan of care activities and workflow documentation requirements for nurses and physicians to inform the development of a shared patient-centered plan of care to support patient engagement. We identified siloed plan of care documentation, with workflow opportunities to converge the nurses plan of care with the physician planned To-do lists and quality and safety checklists. Integration of nurses and physicians plan of care activities into a shared plan of care is a feasible and valuable step toward interprofessional teams that effectively engage patients in plan of care activities. PMID:25954345

  9. The United States national volcanic ash operations plan for aviation

    USGS Publications Warehouse

    Albersheim, Steven; Guffanti, Marianne

    2009-01-01

    Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.

  10. UPWP Unified Planning Work Program

    DOT National Transportation Integrated Search

    1995-05-01

    The Unified Plannrng Work Program (UPWP) iS the planning document that guides the MPO staff in fulfilling its planning responstbilities for the upcoming year. Comprised of tasks that can be changed as the planning needs change. It is intended to serv...

  11. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  12. Test Plan for the Wake Steering Experiment at the Scaled Wind Farm Technology (SWiFT) Facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naughton, Brian Thomas

    This document is a test plan describing the objectives, configuration, procedures, reporting, roles, and responsibilities for conducting the joint Sandia National Laboratories and National Renewable Energy Laboratory Wake Steering Experiment at the Sandia Scaled Wind Farm Technology (SWiFT) facility near Lubbock, Texas in 2016 and 2017 . The purpose of this document is to ensure the test objectives and procedures are sufficiently detailed such that al l involved personnel are able to contribute to the technical success of the test. This document is not intended to address safety explicitly which is addressed in a separate document listed in the referencesmore » titled Sandia SWiFT Facility Site Operations Manual . Both documents should be reviewed by all test personnel.« less

  13. NSF-Sponsored Biological and Chemical Oceanography Data Management Office

    NASA Astrophysics Data System (ADS)

    Allison, M. D.; Chandler, C. L.; Copley, N.; Galvarino, C.; Gegg, S. R.; Glover, D. M.; Groman, R. C.; Wiebe, P. H.; Work, T. T.; Biological; Chemical Oceanography Data Management Office

    2010-12-01

    Ocean biogeochemistry and marine ecosystem research projects are inherently interdisciplinary and benefit from improved access to well-documented data. Improved data sharing practices are important to the continued exploration of research themes that are a central focus of the ocean science community and are essential to interdisciplinary and international collaborations that address complex, global research themes. In 2006, the National Science Foundation Division of Ocean Sciences (NSF OCE) funded the Biological and Chemical Oceanography Data Management Office (BCO-DMO) to serve the data management requirements of scientific investigators funded by the National Science Foundation’s Biological and Chemical Oceanography Sections. BCO-DMO staff members work with investigators to manage marine biogeochemical, ecological, and oceanographic data and information developed in the course of scientific research. These valuable data sets are documented, stored, disseminated, and protected over short and intermediate time frames. One of the goals of the BCO-DMO is to facilitate regional, national, and international data and information exchange through improved data discovery, access, display, downloading, and interoperability. In May 2010, NSF released a statement to the effect that in October 2010, it is planning to require that all proposals include a data management plan in the form of a two-page supplementary document. The data management plan would be an element of the merit review process. NSF has long been committed to making data from NSF-funded research publicly available and the new policy will strengthen this commitment. BCO-DMO is poised to assist in creating the data management plans and in ultimately serving the data and information resulting from NSF OCE funded research. We will present an overview of the data management system capabilities including: geospatial and text-based data discovery and access systems; recent enhancements to data search tools; data export and download utilities; and strategic use of controlled vocabularies to facilitate data integration and improve interoperability.

  14. Public Hearing & Comment Period Document(s) for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    EPA Pesticide Factsheets

    List of public hearing & comment period document(s) for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  15. Pedagogical Documentation and Its Relation to Everyday Activities in Early Years

    ERIC Educational Resources Information Center

    Rintakorpi, Kati; Reunamo, Jyrki

    2017-01-01

    Documentation in early childhood education and care (ECEC) institutions has been developed for decades in various contexts. Today, documentation is preferred as an inclusive method of evaluating, planning, and developing ECEC in the curricula of many countries. Qualitative research on documentation has increased in past years, but quantitative…

  16. Nursing documentation with NANDA and NIC in a comprehensive HIS/EPR system.

    PubMed

    Flø, Kåre

    2006-01-01

    DIPS nursing documentation system facilitates that nurses can write several types of notes into the EPR. Within these notes the nurses can register NANDA diagnoses and NIC interventions with nursing activities. To choose NANDA and NIC the nurse can use a search engine, or she can choose a relevant Care plan guideline and pick the suggested diagnoses and interventions from there. Diagnoses and interventions with nursing activities registered are presented in a Care plan. When a nurse writes a note for a patient she will always be presented the Care plan and she can easy evaluate and update the Care plan.

  17. Amatchmethod Based on Latent Semantic Analysis for Earthquakehazard Emergency Plan

    NASA Astrophysics Data System (ADS)

    Sun, D.; Zhao, S.; Zhang, Z.; Shi, X.

    2017-09-01

    The structure of the emergency plan on earthquake is complex, and it's difficult for decision maker to make a decision in a short time. To solve the problem, this paper presents a match method based on Latent Semantic Analysis (LSA). After the word segmentation preprocessing of emergency plan, we carry out keywords extraction according to the part-of-speech and the frequency of words. Then through LSA, we map the documents and query information to the semantic space, and calculate the correlation of documents and queries by the relation between vectors. The experiments results indicate that the LSA can improve the accuracy of emergency plan retrieval efficiently.

  18. Ten-year space launch technology plan

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This document is the response to the National Space Policy Directive-4 (NSPD-4), signed by the President on 10 Jul. 1991. Directive NSPD-4 calls upon the Department of Defense (DoD), the Department of Energy (DOE), and the National Aeronautics and Space Administration (NASA) to coordinate national space launch technology efforts and to jointly prepare a 10-year space launch technology plan. The nation's future in space rests on the strength of its national launch technology program. This plan documents our current launch technology efforts, plans for future initiatives in this arena, and the overarching philosophy that links these activities into an integrated national technology program.

  19. An Evaluation and Redesign of the Conflict Prediction and Trial Planning Planview Graphical User Interface

    NASA Technical Reports Server (NTRS)

    Laudeman, Irene V.; Brasil, Connie L.; Stassart, Philippe

    1998-01-01

    The Planview Graphical User Interface (PGUI) is the primary display of air traffic for the Conflict Prediction and Trial Planning, function of the Center TRACON Automation System. The PGUI displays air traffic information that assists the user in making decisions related to conflict detection, conflict resolution, and traffic flow management. The intent of this document is to outline the human factors issues related to the design of the conflict prediction and trial planning portions of the PGUI, document all human factors related design changes made to the PGUI from December 1996 to September 1997, and outline future plans for the ongoing PGUI design.

  20. 77 FR 48061 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...

Top