Sample records for dod space test

  1. Planetary/DOD entry technology flight experiments. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Christensen, H. E.; Krieger, R. J.; Mcneilly, W. R.; Vetter, H. C.

    1976-01-01

    The feasibility of using the space shuttle to launch planetary and DoD entry flight experiments was examined. The results of the program are presented in two parts: (1) simulating outer planet environments during an earth entry test, the prediction of Jovian and earth radiative heating dominated environments, mission strategy, booster performance and entry vehicle design, and (2) the DoD entry test needs for the 1980's, the use of the space shuttle to meet these DoD test needs, modifications of test procedures as pertaining to the space shuttle, modifications to the space shuttle to accommodate DoD test missions and the unique capabilities of the space shuttle. The major findings of this program are summarized.

  2. DOD Space Test Program (STP)

    NASA Technical Reports Server (NTRS)

    Smith, Llwyn

    1995-01-01

    This paper describes the Space Test Program (STP) which provides access to space for the DOD-wide space research and development (R&D) community. STP matches a ranked list of sanctioned experiments with available budgets and searches for the most cost effective mechanisms to get the experiments into space. The program has successfully flown over 350 experiments, using dedicated freeflyer spacecraft, secondary space on the Space Shuttle, and various host satellites.

  3. Environmental Assessment for Flight Test to the Edge of Space

    DTIC Science & Technology

    2008-12-22

    1508); 32 CFR Part 989, Environmental Impact Analysis Process; and National Aeronautics and Space Administration ( NASA ) policy and procedures (14 CFR...Part 1216, Subpart 1216.3). The U.S. Air Force Flight Test Center is representing the Department of Defense (DOD) as the lead agency. NASA Dryden...Kansas, Nebraska, South Dakota, and North Dakota; and-land at Edwards AFB. These vehicles could be launched from any DOD or NASA installation or from

  4. Cycle life status of SAFT VOS nickel-cadmium cells

    NASA Technical Reports Server (NTRS)

    Goualard, Jacques

    1993-01-01

    The SAFT prismatic VOS Ni-Cd cells have been flown in geosynchronous orbit since 1977 and in low earth orbit since 1983. Parallel cycling tests are performed by several space agencies in order to determine the cycle life for a wide range of temperature and depth of discharge (DOD). In low Earth orbit (LEO), the ELAN program is conducted on 24 Ah cells by CNES and ESA at the European Battery Test Center at temperatures ranging from 0 to 27 C and DOD from 10 to 40 percent. Data are presented up to 37,000 cycles. One pack (X-80) has achieved 49,000 cycles at 10 C and 23 percent DOD. The geosynchronous orbit simulation of a high DOD test is conducted by ESA on 3 batteries at 10 C and 70, 90, and 100 percent DOD. Thirty-one eclipse seasons are completed, and no signs of degradation have been found. The Air Force test at CRANE on 24 Ah and 40 Ah cells at 20 C and 80 percent DOD has achieved 19 shadow periods. Life expectancy is discussed. The VOS cell technology could be used for the following: (1) in geosynchronous conditions--15 yrs at 10-15 C and 80 percent DOD; and (2) in low earth orbit--10 yrs at 5-15 C and 25-30 percent DOD.

  5. Final Supplemental Environmental Assessment: Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System (JLENS), U.S. Army Dugway Proving Ground, Dugway, Utah

    DTIC Science & Technology

    2009-09-01

    evaluate specific system equipment func- tions, performance, operations, and safety in the field environment. The planned test procedures require free space...emission of radiofrequency (RF) electromagnetic energy within a limited spectral region and controlled power spec- tral density. There would be...for personnel. The applicable DoD standard that provides required guidelines for permissible exposure limits of DoD personnel is DoD Instruction

  6. Microelectronics (Electronic Devices) Research, Development, Test, and Evaluation Laboratories with DoD

    DTIC Science & Technology

    1994-04-08

    Range, New Mexico , the National Aeronautics and Space Administration Langley Research Center in Hampton, Virginia, and the Lewis Research Center in...SUBMITTED TO CONGRESS MARCH 1993 40 Appendix £. Excerpt from the Army’s Justification for DoD Base Realignment and Closure SEXt BYSASD iNLi i/Ba

  7. DoD Space S and T Community of Interest Presentation to National Defense University (Briefing charts)

    DTIC Science & Technology

    2015-09-30

    DoD Space S &T Community of Interest Presentation to National Defense University 30 September 2015 Dr. John Stubstad Space S &T COI Chair...STRATEGY 2015 Photo: Coronal mass ejection as recorded by NASA, August 31, 2014 DoD Space S &T Strategy • Biennial report to Congress – updated...advantages enabled by space systems at the strategic, operational, and tactical levels • Looks across the entire DoD Space S &T Enterprise

  8. Development and Testing of Carbon-Carbon Nozzle Extensions for Upper Stage Liquid Rocket Engines

    NASA Technical Reports Server (NTRS)

    Valentine, Peter G.; Gradl, Paul R.; Greene, Sandra E.

    2017-01-01

    Carbon-carbon (C-C) composite nozzle extensions are of interest for use on a variety of launch vehicle upper stage engines and in-space propulsion systems. The C-C nozzle extension technology and test capabilities being developed are intended to support National Aeronautics and Space Administration (NASA) and Department of Defense (DOD) requirements, as well as those of the broader Commercial Space industry. For NASA, C-C nozzle extension technology development primarily supports the NASA Space Launch System (SLS) and NASA's Commercial Space partners. Marshall Space Flight Center (MSFC) efforts are aimed at both (a) further developing the technology and databases needed to enable the use of composite nozzle extensions on cryogenic upper stage engines, and (b) developing and demonstrating low-cost capabilities for testing and qualifying composite nozzle extensions. Recent, on-going, and potential future work supporting NASA, DOD, and Commercial Space needs will be discussed. Information to be presented will include (a) recent and on-going mechanical, thermal, and hot-fire testing, as well as (b) potential future efforts to further develop and qualify domestic C-C nozzle extension solutions for the various upper stage engines under development.

  9. Joint Space Operations Center (JSpOC) Mission System Increment 2 (JMS Inc 2)

    DTIC Science & Technology

    2016-03-01

    Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment Decision FY...date has slipped from September 2016 to December 2016 and FDD has slipped from October 2016 to March 2017 since the last MAIS Annual Report...testing. This added test time, in combination with funding reductions and the US Government furlough and shutdown in FY13, caused a total FDD slip

  10. Measurements of Ionospheric Density, Temperature, and Spacecraft Charging in a Space Weather Constellation

    NASA Astrophysics Data System (ADS)

    Balthazor, R. L.; McHarg, M. G.; Wilson, G.

    2016-12-01

    The Integrated Miniaturized Electrostatic Analyzer (IMESA) is a space weather sensor developed by the United States Air Force Academy and integrated and flown by the DoD's Space Test Program. IMESA records plasma spectrograms from which can be derived plasma density, temperature, and spacecraft frame charging. Results from IMESA currently orbiting on STPSat-3 are presented, showing frame charging effects dependent on a complex function of the number of solar panel cell strings switched in, solar panel current, and plasma density. IMESA will fly on four more satellites launching in the next two calendar years, enabling an undergraduate DoD space weather constellation in Low Earth Orbit that has the ability to significantly improve space weather forecasting capabilities using assimilative forecast models.

  11. Space Acquisitions: Challenges Facing DOD as it Changes Approaches to Space Acquisitions

    DTIC Science & Technology

    2016-03-09

    core efforts—DOD, the National Aeronautics and Space Administration ( NASA ), and the National Oceanic and Atmospheric Administration ( NOAA ...thorough analysis of some of the 12 capabilities identified for the assessment, but ineffective coordination with NOAA , among other issues, imposed...employ a formal collaboration mechanism that identified roles and responsibilities for DOD and NOAA in conducting the AOA, which contributed to DOD

  12. EELV Secondary Payload Adapter (ESPA)

    NASA Astrophysics Data System (ADS)

    Haskett, Scott A.; Weis, Steven C.; Doggrell, Leslie J.; Sciulli, Dino; Meink, Troy E.; Ganley, Jeff T.; Maly, Joseph R.; Jurisson, Karl

    2000-11-01

    Despite growing international interest in small satellites, high dedicated expendable launch vehicle costs and the lack of secondary launch opportunities continue to hinder the full exploitation of small satellite technology. In the United States, the Department of Defense (DoD), NASA, other government agencies, commercial companies, and many universities use small satellites to perform space experiments, demonstrate new technology, and test operational prototype hardware. In addition, the DoD continues to study the role of small satellites in fulfilling operational mission requirements. However, the US lacks sufficient small satellite launch capacity. Furthermore, US government agencies are restricted to the use of US launch vehicles, which eliminates many affordable launch opportunities. In an effort to increase the number of space experiments that can be flown with a small, fixed budget, the DoD Space Test Program (STP) has teamed with the Air Force Research Laboratory Space Vehicles Directorate (AFRL/VS) to develop a low-cost solution for the small satellite launch program. Our solution, which can be implemented on both Boeing and Lockheed-Martin Evolved Expendable Launch Vehicle-Medium (EELV-M) boosters, is called the EELV Secondary Payload Adaptor (ESPA). ESPA will increase the number of launch opportunities for 180kg-class (or smaller) satellites at prices highly competitive with other secondary launch services worldwide.

  13. Execution Of Systems Integration Principles During Systems Engineering Design

    DTIC Science & Technology

    2016-09-01

    This thesis discusses integration failures observed by DOD and non - DOD systems as, inadequate stakeholder analysis, incomplete problem space and design ... design , development, test and deployment of a system. A lifecycle structure consists of phases within a methodology or process model. There are many...investigate design decisions without the need to commit to physical forms; “ experimental investigation using a model yields design or operational

  14. A Summary of DOD-Sponsored Research Performed at NASA Langley's Impact Dynamics Research Facility

    NASA Technical Reports Server (NTRS)

    Jackson, Karen E.; Boitnott, Richard L.; Fasanella, Edwin L.; Jones, Lisa E.; Lyle, Karen H.

    2004-01-01

    The Impact Dynamics Research Facility (IDRF) is a 240-ft.-high gantry structure located at NASA Langley Research Center in Hampton, Virginia. The IDRF was originally built in the early 1960's for use as a Lunar Landing Research Facility. As such, the facility was configured to simulate the reduced gravitational environment of the Moon, allowing the Apollo astronauts to practice lunar landings under realistic conditions. In 1985, the IDRF was designated a National Historic Landmark based on its significant contributions to the Apollo Moon Landing Program. In the early 1970's the facility was converted into its current configuration as a full-scale crash test facility for light aircraft and rotorcraft. Since that time, the IDRF has been used to perform a wide variety of impact tests on full-scale aircraft, airframe components, and space vehicles in support of the General Aviation (GA) aircraft industry, the U.S. Department of Defense (DOD), the rotorcraft industry, and the NASA Space program. The objectives of this paper are twofold: to describe the IDRF facility and its unique capabilities for conducting structural impact testing, and to summarize the impact tests performed at the IDRF in support of the DOD. These tests cover a time period of roughly 2 1/2 decades, beginning in 1975 with the full-scale crash test of a CH-47 Chinook helicopter, and ending in 1999 with the external fuel system qualification test of a UH-60 Black Hawk helicopter. NASA officially closed the IDRF in September 2003; consequently, it is important to document the past contributions made in improved human survivability and impact tolerance through DOD-sponsored research performed at the IDRF.

  15. Cycle life testing of lithium-ion batteries for small satellite LEO space missions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mayer, S.T.; Feikert, J.H.; Kaschmitter, J.L.

    1993-08-16

    In 1990, Sony corporation announced their intention to manufacture a rechargeable lithium ion battery, based on the intercalation of lithium ions into a carbonaceous anode. The cells were first introduced for portable telephone use in June, 1991. (1) A 3.6V average cell voltage (4.1-2.75V range); (2) Excellent cycle life (1200 @ 100% DOD); (3) Good capacity retention (70% after 6 months); (4) Wide temperature range performance ({minus}20 to +60{degrees}C); (5) Excellent Discharge rate (82% capacity at 30 min. discharge rate); (6) Excellent Charge rate (100% Charge in <3 hrs); and (7) High energy density (264 W*hr/1 and 120 Whr/kg formore » ``D`` size cell. These specifications show significant promise for application of these batteries in low earth orbit (LEO) small satellites, particularly when compared to existing NiH{sub 2} and NiCd technology. The very high energy density and specific energy will reduce power system volume and weight. The wide temperature range enables simpler thermal design, particularly for new, small, high power satellites. The materials used in the lithium ion batteries are relatively inexpensive and benign, so that we expect costs to come down substantially in the future. The specified cycle life at 100% DOD is also 50% longer than most NiCds, so low DOD (depth of discharge) performance could be substantial. This study was undertaken to: (a) assess the feasibility for using lithium ion cells on small satellite LEO missions and (b) verify the claims of the manufacturer. This was accomplished by performing a detailed autopsy and various depth of discharge and rate tests on the cells. Of special interest was the cycle life performance of these cell at various depths of discharge DOD`s, to get an initial measure of the reduction in capacity fade with cycle conditions. Low DOD`s are used to extend the life of all batteries used in a space application.« less

  16. A Modest Proposal: For Preventing Space Operations from Being a Burden to the Navy, and for Making the Space Cadre Beneficial to the Community

    DTIC Science & Technology

    2007-09-01

    the panorama of overall DoD outlays must take precedence over service-specific programs and turf battles. In the National Security Space “big...reaction control systems, thermal control systems, satellite integration and test, launch vehicle integration, and satellite-to- boost-stage

  17. Joint Lead-Free Solder Test Program for High Reliability Military and Space Applications

    NASA Technical Reports Server (NTRS)

    Brown, Christina

    2004-01-01

    Current and future space and defense systems face potential risks from the continued use of tin-lead solder, including: compliance with current environmental regulations, concerns about potential environmental legislation banning lead-containing products, reduced mission readiness, and component obsolescence with lead surface finishes. For example, the United States Environmental Protection Agency (USEPA) has lowered the Toxic Chemical Release reporting threshold for lead to 100 pounds. Overseas, the Waste Electrical and Electronic Equipment (WEEE) and the Restriction on Hazardous Substances (RoHS) Dicctives in Europe and similar mandates in Japan have instilled concern that a legislative body will prohibit the use of lead in aerospace/military electronics soldering. Any potential banning of lead compounds could reduce the supplier base and adversely affect the readiness of missions led by the National Aeronautics and Space Administration (NASA) and the U.S. Department of Defense (DoD). Before considering lead-free electronics for system upgrades or future designs, however, it is important for the DoD and NASA to know whether lead-free solders can meet their systems' requirements. No single lead-free solder is likely to qualify for all defense and space applications. Therefore, it is important to validate alternative solders for discrete applications. As a result of the need for comprehensive test data on the reliability of lead-free solders, a partnership was formed between the DoD, NASA, and several original equipment manufactures (OEMs) to conduct solder-joint reliability (laboratory) testing of three lead-free solder alloys on newly manufactured and reworked circuit cards to generate performance data for high-reliability (IPC Class 3) applications.

  18. Microchip problems plague DOD

    NASA Astrophysics Data System (ADS)

    Smith, R. J.

    1984-10-01

    The major issues in the controversy over the discovery of millions of defective microchips sold to the DOD by the Texas Instruments (TI) corporation are outlined. Defects in the microcircuits are blamed on inadequate testing procedures performed by TI during manufacture, and on inadequate testing procedures used by a subcontractor especially contracted to test the chips. Because the problem persisted over a period of years, defects might be possible in as many as 100 million chips used in a broad range of military applications including the Trident submarine, the B-52, B-1B, F-15, F-111, F-4, A-6, and A-7 aircraft, the Harpoon and HARM missile systems, and the Space Shuttles Discovery and Challenger. It is pointed out that although TI has accepted responsibility for the defective chips, little will be done by the DOD to compel the company to replace them, or to upgrade testing procedures. It is concluded that the serious nature of the problem could renew interest in recommendations for the standardization of military microcircuits.

  19. Ground Vibration Testing Options for Space Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Patterson, Alan; Smith, Robert K.; Goggin, David; Newsom, Jerry

    2011-01-01

    New NASA launch vehicles will require development of robust systems in a fiscally-constrained environment. NASA, Department of Defense (DoD), and commercial space companies routinely conduct ground vibration tests as an essential part of math model validation and launch vehicle certification. Although ground vibration testing must be a part of the integrated test planning process, more affordable approaches must also be considered. A study evaluated several ground vibration test options for the NASA Constellation Program flight test vehicles, Orion-1 and Orion-2, which concluded that more affordable ground vibration test options are available. The motivation for ground vibration testing is supported by historical examples from NASA and DoD. The approach used in the present study employed surveys of ground vibration test subject-matter experts that provided data to qualitatively rank six test options. Twenty-five experts from NASA, DoD, and industry provided scoring and comments for this study. The current study determined that both element-level modal tests and integrated vehicle modal tests have technical merits. Both have been successful in validating structural dynamic math models of launch vehicles. However, element-level testing has less overall cost and schedule risk as compared to integrated vehicle testing. Future NASA launch vehicle development programs should anticipate that some structural dynamics testing will be necessary. Analysis alone will be inadequate to certify a crew-capable launch vehicle. At a minimum, component and element structural dynamic tests are recommended for new vehicle elements. Three viable structural dynamic test options were identified. Modal testing of the new vehicle elements and an integrated vehicle test on the mobile launcher provided the optimal trade between technical, cost, and schedule.

  20. Increasing the Weaponization of Space: A Prescription for Further Progress

    DTIC Science & Technology

    1998-04-01

    130 APPENDIX C : SPACE WEAPON PHENOMENOLOGIES...level of research and development (R& D ) to occur. Based on information from a prudent R& D effort, including realistic test results, DOD will be able...2B First European Space Research Organization (ESRO) satellite 8 Nov 1969 Azur First West German satellite (on U.S. launcher) 24 Apr 1970 SKW-1 (DFH1

  1. Developing and Applying Synthesis Models of Emerging Space Systems

    DTIC Science & Technology

    2016-03-01

    enables the exploration of small satellite physical trade -offs early in the conceptual design phase of the DOD space acquisition process. Early...provide trade space insights that can assist DOD space acquisition professionals in making better decisions in the conceptual design phase. More informed

  2. Nickel-hydrogen LEO cycling at 20-50 percent DOD. [depth of discharge

    NASA Technical Reports Server (NTRS)

    Lowery, John E.; Mai, Jenny

    1991-01-01

    Two NiH2 two-cell packs made up of engineering cells built according to the Hubble Space Telescope design (EPI RNH 90-3) are currently being low-earth-orbit (LEO) cycled at 20-50 percent depth of discharge (DOD). The cells were manufactured by Eagle-Picher Industries, Inc., and activated with electrolyte (KOH) concentrations of 26 percent (pack No.1) and 31 percent (pack No.2), for use during evaluation of the HST cell design. The cells have been grouped according to electrolyte concentration but follow the same test schedule for comparison. This test was set up to study the behavior of NiH2 cells having differing electrolyte concentrations, when operated at relatively high DOD (20-50 percent) in a LEO cycling program. The test was designed specifically to allow the cells to pick their own recharge ratio for varying DOD and varying EOC (end of charge) voltages. The cells are being cycled in a simulated 96-min orbit with 60-min charge and 36-min discharge where an EOC cutoff voltage controls high-rate charging. EOC cutoff voltages vary between 1.48 V and 1.56 V.

  3. Update on Progress of Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS) - Cyclops

    NASA Technical Reports Server (NTRS)

    Newswander, Daniel; Smith, James P.; Lamb, Craig R.; Ballard, Perry G.

    2014-01-01

    The Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS), known as "Cyclops" to the International Space Station (ISS) community, was introduced last August (2013) during Technical Session V: From Earth to Orbit of the 27th Annual AIAA/USU Conference on Small Satellites. Cyclops is a collaboration between the NASA ISS Program, NASA Johnson Space Center Engineering, and Department of Defense (DoD) Space Test Program (STP) communities to develop a dedicated 50-100 kg class ISS small satellite deployment system. This paper will address the progress of Cyclops through its fabrication, assembly, flight certification, and on-orbit demonstration phases. It will also go into more detail regarding its anatomy, its satellite deployment concept of operations, and its satellite interfaces and requirements. Cyclops is manifested to fly on Space-X 4 which is currently scheduled in July 2014 with its initial satellite deployment demonstration of DoD STP's SpinSat and UT/TAMU's Lonestar satellites being late summer or fall of 2014.

  4. Department of Defense high power laser program guidance

    NASA Astrophysics Data System (ADS)

    Muller, Clifford H.

    1994-06-01

    The DoD investment of nominally $200 million per year is focused on four high power laser (HPL) concepts: Space-Based Laser (SBL), a Ballistic Missile Defense Organization effort that addresses boost-phase intercept for Theater Missile Defense and National Missile Defense; Airborne Laser (ABL), an Air Force effort that addresses boost-phase intercept for Theater Missile Defense; Ground-Based Laser (GBL), an Air Force effort addressing space control; and Anti-Ship Missile Defense (ASMD), a Navy effort addressing ship-based defense. Each organization is also supporting technology development with the goal of achieving less expensive, brighter, and lighter high power laser systems. These activities represent the building blocks of the DoD program to exploit the compelling characteristics of the high power laser. Even though DoD's HPL program are focused and moderately strong, additional emphasis in a few technical areas could help reduce risk in these programs. In addition, a number of options are available for continuing to use the High-Energy Laser System Test Facility (HELSTF) at White Sands Missile Range. This report provides a brief overview and guidance for the five efforts which comprise the DoD HPL program (SBL, ABL, GBL, ASMD, HELSTF).

  5. 75 FR 6359 - Federal Advisory Committee; DoD Board of Actuaries; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... DEPARTMENT OF DEFENSE Office of the Secretary Federal Advisory Committee; DoD Board of Actuaries... the DoD Board of Actuaries will meet on July 22 and 23, 2010. Subject to the availability of space...D Office of the Actuary, 4040 N. Fairfax Drive, Suite 308, Arlington, VA 22203; phone 703-696-7413...

  6. Space Fence Ground-Based Radar System Increment 1 (Space Fence Inc 1)

    DTIC Science & Technology

    2015-12-01

    Net - Centric Data Strategy and Net-Centric Services Strategy, and the principles and rules identified in the DoD IEA, excepting tactical and...Centric Data Strategy and Net- Centric Services Strategy, and the principles and rules identified in the DoD IEA, excepting tactical and non-IP...Strategy, and the principles and rules identified in the DoD IEA, excepting tactical and non-IP communi- cations. Compliant with TBD Space Fence must

  7. Evaluating Options for Civil Space Situational Awareness (SSA)

    NASA Astrophysics Data System (ADS)

    Lal, B.; Carioscia, S. A.

    In recent years, the number of active satellites and human-made orbital space debris has increased dramatically. An expansion of activities in space, as is currently being proposed by many commercial and international entities, is expected to further exacerbate this challenge. The 18th Space Control Squadron under the Department of Defense (DOD) United States Strategic Command provides space situational awareness (SSA) services to users outside the national security community at no cost. International and commercial users demand better SSA service than is currently feasible, and the demand comes at a time when DOD is under pressure to better prepare for and respond to growing space-based threats to national security. Concerned about the possibility of overextending across conflicting missions in a fiscally constrained environment, some DOD officials have publicly noted a desire to move SSA services not related to national security out of DOD purview. Responding to a request from the Federal Aviation Administration (FAA) Office of Commercial Space Transportation (AST), researchers at the Science and Technology Policy Institute (STPI) identified and evaluated potential approaches for providing SSA services for civil and commercial operations in space. In this paper, we summarize the report [1] and present the pros and cons of four approaches to the provision of civil SSA services in the United States: (1) maintaining status quo through continued provision by DOD; (2) provision by a civil government entity; (3) industry self-provision; and (4) provision by an international organization. Within the second approach, assuming the provision of SSA by a civil agency, STPI further identified and discussed four options: (1) civil agency service capability embedded within DOD; (2) independent civil service capability, using DOD software and systems; (3) independent civil service capability, using commercial software and systems; and (4) the government certifies non-governmental entities (NGEs) to provide service capability. All of these approaches keep military and national security SSA services within DOD. Selecting which approach or option to proceed with depends on the determination of the role of government in the domain as well as consideration of other policy challenges.

  8. The 100 kW space station. [regenerative fuel cells and nickel hydrogen and nickel cadmium batteries for solar arrays

    NASA Technical Reports Server (NTRS)

    Mckhann, G.

    1977-01-01

    Solar array power systems for the space construction base are discussed. Nickel cadmium and nickel hydrogen batteries are equally attractive relative to regenerative fuel cell systems at 5 years life. Further evaluation of energy storage system life (low orbit conditions) is required. Shuttle and solid polymer electrolyte fuel cell technology appears adequate; large units (approximately four times shuttle) are most appropriate and should be studied for a 100 KWe SCB system. A conservative NiH2 battery DOD (18.6%) was elected due to lack of test data and offers considerable improvement potential. Multiorbit load averaging and reserve capacity requirements limit nominal DOD to 30% to 50% maximum, independent of life considerations.

  9. SpaceX Recovery Trainer Egress and Handling Testing

    NASA Image and Video Library

    2018-04-17

    Pararescue specialists from the 304th Rescue Squadron, located in Portland, Oregon and supporting the 45th Operations Group’s Detachment 3, based out of Patrick Air Force Base, secure a covered life raft as the sun sets during an astronaut rescue training exercise with NASA’s Commercial Crew Program and SpaceX off of Florida’s eastern coast in April. The specially designed 20-person life raft is equipped with enough food, water and medical supplies to sustain both rescuers and crew for up to three days, if necessary. In this situation, the Department of Defense (DOD) would complete the rescue by enlisting help from the US Coast Guard, a DOD ship, or a nearby commercial ship of opportunity to transport the crew to safety.

  10. Proceedings of the Fifth NASA/NSF/DOD Workshop on Aerospace Computational Control

    NASA Technical Reports Server (NTRS)

    Wette, M. (Editor); Man, G. K. (Editor)

    1993-01-01

    The Fifth Annual Workshop on Aerospace Computational Control was one in a series of workshops sponsored by NASA, NSF, and the DOD. The purpose of these workshops is to address computational issues in the analysis, design, and testing of flexible multibody control systems for aerospace applications. The intention in holding these workshops is to bring together users, researchers, and developers of computational tools in aerospace systems (spacecraft, space robotics, aerospace transportation vehicles, etc.) for the purpose of exchanging ideas on the state of the art in computational tools and techniques.

  11. Shuttle Contamination And Experimentation: DoD Implications

    NASA Astrophysics Data System (ADS)

    Barnhart, B. J.; Baker, J. C.

    1981-07-01

    As the DOD makes the transition into the Shuttle era, experimenters are becoming more concerned about the environmental contamination of the Shuttle Orbiter. Their concern is that Shuttle contamination could prevent major planned experiments from obtaining required data, particularly sensitive infrared systems (e.g., Talon Gold, SIRE, STMP). The performance of optical experiments could be limited by the natural background, by light scattering and emissions from particulates and molecules, and by molecular absorption. Deposition and optical surface degradation may prove to be extensive problems, particularly for cryogenic optics. Other experiments such as communications and space environment tests may also be affected by deposition as well as electromagnetic interference. It has been known that the Shuttle's environment could cause contamination problems during water dumps, thruster firings, paint outgassing and other sources. Predictions have been made, but the contamination species and extent of these problems will not be known definitely until space measurements are made. This paper identifies the contamination types, sources, and their possible effect on particular types of space experiments. The paper also discusses NASA's plans for contamination measurements and the Space Test experiments which could contribute to early resolution of the contamination questions.

  12. Shuttle Contamination And Experimentation: DoD Implications

    NASA Astrophysics Data System (ADS)

    Barnhart, B. J.; Baker, J. C.

    1982-02-01

    As the DOD makes the transition into the Shuttle era, experimenters are becoming more concerned about the environmental contamination of the Shuttle Orbiter. Their concern is that Shuttle contamination could prevent major planned experiments from obtaining required data, particularly sensitive infrared systems (e.g., Talon Gold, SIRE, STMP). The performance of optical experiments could be limited by the natural background, by light scattering and emissions from particulates and molecules, and by molecular absorption. Deposition and optical surface degradation may prove to be extensive problems, particularly for cryogenic optics. Other experiments such as communications and space environment tests may also be affected by deposition as well as electromagnetic interference. It has been known that the Shuttle's environment could cause contamination problems during water dumps, thruster firings, paint outgassing and other sources. Predictions have been made, but the contamination species and extent of these problems will not be known definitely until space measurements are made. This paper identifies the contamination types, sources, and their possible effect on particular types of space experiments. The paper also discusses NASA's plans for contamination measurements and the Space Test experiments which could contribute to early resolution of the contamination questions.

  13. Joint NASA and DoD deployable optics space experiment

    NASA Astrophysics Data System (ADS)

    Schulthess, Marcus R.; Levine, Marie B.; Bell, Kevin D.; Leonard, Steve; Vanik, Michael W.

    2000-07-01

    The Air Force Research Lab is proposing a DoD partnership with NASA on NEXUS; a deployable optics flight demonstrator scheduled to launch in 2004. NEXUS is designed to demonstrate technologies for the Next Generation Space Telescope, primarily the deployment and wave front control of a 2.8 meter optical telescope in space.

  14. DOD Space Systems: Additional Knowledge Would Better Support Decisions about Disaggregating Large Satellites

    DTIC Science & Technology

    2014-10-01

    considering new approaches. According to Air Force Space Command, U.S. space systems face intentional and unintentional threats , which have increased...life cycle costs • Demand for more satellites may stimulate new entrants and competition to lower acquisition costs. • Smaller, less complex...Fiscal constraints and growing threats to space systems have led DOD to consider alternatives for acquiring space-based capabilities, including

  15. Marshall Space Flight Center's Impact Testing Facility Capabilities

    NASA Technical Reports Server (NTRS)

    Finchum, Andy; Hubbs, Whitney; Evans, Steve

    2008-01-01

    Marshall Space Flight Center s (MSFC) Impact Testing Facility (ITF) serves as an important installation for space and missile related materials science research. The ITF was established and began its research in spacecraft debris shielding in the early 1960s, then played a major role in the International Space Station debris shield development. As NASA became more interested in launch debris and in-flight impact concerns, the ITF grew to include research in a variety of impact genres. Collaborative partnerships with the DoD led to a wider range of impact capabilities being relocated to MSFC as a result of the closure of Particle Impact Facilities in Santa Barbara, California. The Particle Impact Facility had a 30 year history in providing evaluations of aerospace materials and components during flights through rain, ice, and solid particle environments at subsonic through hypersonic velocities. The facility s unique capabilities were deemed a "National Asset" by the DoD. The ITF now has capabilities including environmental, ballistic, and hypervelocity impact testing utilizing an array of air, powder, and two-stage light gas guns to accommodate a variety of projectile and target types and sizes. Numerous upgrades including new instrumentation, triggering circuitry, high speed photography, and optimized sabot designs have been implemented. Other recent research has included rain drop demise characterization tests to obtain data for inclusion in on-going model development. The current and proposed ITF capabilities range from rain to micrometeoroids allowing the widest test parameter range possible for materials investigations in support of space, atmospheric, and ground environments. These test capabilities including hydrometeor, single/multi-particle, ballistic gas guns, exploding wire gun, and light gas guns combined with Smooth Particle Hydrodynamics Code (SPHC) simulations represent the widest range of impact test capabilities in the country.

  16. Space Acquisitions: Some Programs Have Overcome Past Problems, but Challenges and Uncertainty Remain for the Future

    DTIC Science & Technology

    2015-04-29

    are being conducted for the SpaceX Falcon 9 v1.1 launch system. In addition, in its fiscal year 2016 President’s Budget request, DOD requested funding...DOD expects SpaceX to be certified by June 2015. Additionally, the department has faced unexpected complications, such as challenges to its

  17. Common Risk Criteria Standards for National Test Ranges

    DTIC Science & Technology

    2016-08-01

    mitigation is a national policy goal. The most recent National Space Policy of the United States (dated June 28, 2010) states that “the United States will...pursue the following goals in its national space programs …strengthening measures to mitigate orbital debris.”5 While DoD Directive (DoDD) 3100.106... United States of America. National Space Policy of the United States of America. 28 June, 2010. May be superseded by update. Retrieved 7 April 2016

  18. UH1-Y - Benefits and Deficiencies

    DTIC Science & Technology

    2009-02-20

    Report, NA 01 HCG -1 (hereinafter Test and Evaluation Report). 2 author’s experience. 3 Test and Evaluation Report. 4 Test and Evaluation Report...Critical Intelligence. Aug 14, 24(33). - - - 2008. DOD Approves Full Production for UH-1Y Despite Major Deficiency. Oct 2, 24(40). NA 01-11- HCG -2-1...2008. Operational Test and Evaluation Report, NA 01 HCG -1. Parmalee, Patricia, ed. 2005. Test Time. Aviation Week & Space Technology. Jun 20, 162

  19. Risk of spacecraft on-orbit obsolescence: Novel framework, stochastic modeling, and implications

    NASA Astrophysics Data System (ADS)

    Dubos, Gregory F.; Saleh, Joseph H.

    2010-07-01

    The Government Accountability Office (GAO) has repeatedly noted the difficulties encountered by the Department of Defense (DOD) in keeping its acquisition of space systems on schedule and within budget. Among the recommendations provided by GAO, a minimum Technology Readiness Level (TRL) for technologies to be included in the development of a space system is advised. The DOD considers this recommendation impractical arguing that if space systems were designed with only mature technologies (high TRL), they would likely become obsolete on-orbit fairly quickly. The risk of on-orbit obsolescence is a key argument in the DOD's position for dipping into low technology maturity for space acquisition programs, but this policy unfortunately often results in the cost growth and schedule slippage criticized by the GAO. The concept of risk of on-orbit obsolescence has remained qualitative to date. In this paper, we formulate a theory of risk of on-orbit obsolescence by building on the traditional notion of obsolescence and adapting it to the specificities of space systems. We develop a stochastic model for quantifying and analyzing the risk of on-orbit obsolescence, and we assess, in its light, the appropriateness of DOD's rationale for maintaining low TRL technologies in its acquisition of space assets as a strategy for mitigating on-orbit obsolescence. Our model and results contribute one step towards the resolution of the conceptual stalemate on this matter between the DOD and the GAO, and we hope will inspire academics to further investigate the risk of on-orbit obsolescence.

  20. 14 CFR 77.21 - Department of Defense (DOD) airport imaginary surfaces.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Department of Defense (DOD) airport imaginary surfaces. 77.21 Section 77.21 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Determining Obstructions to Air Navigation or Navigational Aids or Facilities § 77.21 Department of Defense...

  1. 14 CFR 77.21 - Department of Defense (DOD) airport imaginary surfaces.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Department of Defense (DOD) airport imaginary surfaces. 77.21 Section 77.21 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Determining Obstructions to Air Navigation or Navigational Aids or Facilities § 77.21 Department of Defense...

  2. 14 CFR 77.21 - Department of Defense (DOD) airport imaginary surfaces.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Department of Defense (DOD) airport imaginary surfaces. 77.21 Section 77.21 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... Determining Obstructions to Air Navigation or Navigational Aids or Facilities § 77.21 Department of Defense...

  3. Development of thermal control methods for specialized components and scientific instruments at very low temperatures (follow-on)

    NASA Technical Reports Server (NTRS)

    Wright, J. P.; Wilson, D. E.

    1976-01-01

    Many payloads currently proposed to be flown by the space shuttle system require long-duration cooling in the 3 to 200 K temperature range. Common requirements also exist for certain DOD payloads. Parametric design and optimization studies are reported for multistage and diode heat pipe radiator systems designed to operate in this temperature range. Also optimized are ground test systems for two long-life passive thermal control concepts operating under specified space environmental conditions. The ground test systems evaluated are ultimately intended to evolve into flight test qualification prototypes for early shuttle flights.

  4. An Overview of the NASA Aeronautics Test Program Strategic Plan

    NASA Technical Reports Server (NTRS)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.

  5. Department of Defense (DOD) Automated Biometric Identification System (ABIS) Version 1.2: Initial Operational Test and Evaluation Report

    DTIC Science & Technology

    2015-05-01

    Director, Operational Test and Evaluation Department of Defense (DOD) Automated Biometric Identification System (ABIS) Version 1.2 Initial...Operational Test and Evaluation Report May 2015 This report on the Department of Defense (DOD) Automated Biometric Identification System...COVERED - 4. TITLE AND SUBTITLE Department of Defense (DOD) Automated Biometric Identification System (ABIS) Version 1.2 Initial Operational Test

  6. Space Acquisitions: DOD Faces Challenges in Fully Realizing Benefits of Satellite Acquisition Improvements

    DTIC Science & Technology

    2012-03-21

    Test Program ( STP ) was targeted for termination in the fiscal year 2013 budget. STP was created in 1965 to serve as an integrator to provide launch...been lagging behind schedule and it had taken positive actions to instill better practices and more focused leadership for space. Progress has...instance, the second Global Positioning System (GPS) IIF satellite experienced technical problems that could shorten its operational lifetime. The

  7. A General Overview of the Data Acquisition and Controls Systems (DACS) of the E-Complex at NASA's Stennis Space Center

    NASA Technical Reports Server (NTRS)

    Hughes, Mark S.; Hebert, Phillip W.; Davis, Dawn M.; Jensen, Scott L.; Abell, Frederick K., Jr.

    2004-01-01

    The John C. Stennis Space Center (SSC) provides test operations services to a variety of customers, including NASA, DoD, and commercial enterprises for the development of current and next-generation rocket propulsion systems. Many of these testing services are provided in the E-Complex test facilities composed of three active test stands (E1, E2, & E3) and 7 total test positions. Each test position is outfitted with unique sets of data acquisition and controls hardware and software that record both facility and test article data and enable safe operation of the test facility. This paper addresses each system in more detail including efforts to upgrade hardware and software.

  8. SpaceX Recovery Trainer Egress and Handling Testing

    NASA Image and Video Library

    2018-04-17

    A C-17 Globemaster aircraft from the Alaska Air National Guard’s 249th Airlift Squadron flies overhead as pararescue specialists from the 304th Rescue Squadron, located in Portland, Oregon complete an astronaut rescue training exercise inside a covered life raft on the Atlantic Ocean. The pararescue specialists, supporting the 45th Operations Group’s Detachment 3, based out of Patrick Air Force Base, conducted the exercise in April with NASA’s Commercial Crew Program and SpaceX off of Florida’s eastern coast. The specially designed 20-person life raft is equipped with enough food, water and medical supplies to sustain both rescuers and crew for up to three days, if necessary. In this situation, the Department of Defense (DOD) would complete the rescue by enlisting help from the US Coast Guard, a DOD ship, or a nearby commercial ship of opportunity to transport the crew to safety.

  9. A Summary fo Solar Sail Technology Developments and Proposed Demonstration Missions

    NASA Technical Reports Server (NTRS)

    Garner, Charles; Diedrich, Benjamin; Leipold, Manfred

    1999-01-01

    NASA's drive to reduce mission costs and accept the risk of incorporating innovative, high payoff technologies into it's missions while simultaneously undertaking ever more difficult missions has sparked a greatly renewed interest in solar sails. From virtually no technology or flight mission studies activity three years ago solar sails are now included in NOAA, NASA, DOD, DLR, ESA and ESTEC technology development programs and technology roadmaps. NASA programs include activities at Langley Research Center, Jet Propulsion Laboratory, Marshall Space Flight Center, Goddard Space Flight Center, and the NASA Institute for Advanced Concepts; NOAA has received funding for a proposed solar sail mission; DLR is designing and fabricating a 20-m laboratory model sail, there are four demonstration missions under study at industry, NASA, DOD and Europe, two new text books on solar sailing were recently published and one new test book is planned. This paper summarizes these on-going developments in solar sails.

  10. NASA Collaborative Approach Mitigates Environmentally-Driven Obsolescence

    NASA Technical Reports Server (NTRS)

    Greene, Brian; Leeney, Bob; Richards, Joni

    2016-01-01

    National Aeronautics and Space Administration (NASA) missions, like Department of Defense (DoD) organizations, require the rigorous testing and qualification of critical materials. Obsolescence supply risks created by environmental requirements can affect the cost, schedule and performance of NASA missions and the resilience of critical infrastructure. The NASA Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center helps to identify obsolescence supply risks driven by environmental requirements and works proactively with NASA Centers and Programs, the DoD, the European Space Agency (ESA) and other agencies and partners to identify and evaluate environmentally friendly alternatives. TEERM tracks environmental regulations, identifies the potential loss of material availability and works with NASA programs and Centers to evaluate potential impacts through a risk assessment approach. TEERM collaborative projects identify, demonstrate and evaluate commercially viable alternative technologies and materials. A major focus during the Space Shuttle Program was the need to replace ozone depleting substances that were used in spray foam and cleaning applications. The potential obsolescence of coatings containing hexavalent chromium and the risks associated with lead free solder were also of concern for the Space Shuttle and present ongoing risks to new programs such as the Space Launch System. One current project teams NASA and ESA in the evaluation and testing of individual coatings and coating systems as replacements for hexavalent chromium coatings in aerospace applications. The proactive, collaborative approach used by TEERM helps reduce the cost burden on any one team partner, reduces duplication of effort, and enhances the technical quality and overall applicability of the testing and analysis.

  11. Low-cost Active Structural Control Space Experiment (LASC)

    NASA Technical Reports Server (NTRS)

    Robinett, Rush; Bukley, Angelia P.

    1992-01-01

    The DOE Lab Director's Conference identified the need for the DOE National Laboratories to actively and aggressively pursue ways to apply DOE technology to problems of national need. Space structures are key elements of DOD and NASA space systems and a space technology area in which DOE can have a significant impact. LASC is a joint agency space technology experiment (DOD Phillips, NASA Marshall, and DOE Sandia). The topics are presented in viewgraph form and include the following: phase 4 investigator testbed; control of large flexible structures in orbit; INFLEX; Controls, Astrophysics; and structures experiments in space; SARSAT; and LASC mission objectives.

  12. DoD Space Radiation Concerns.

    DTIC Science & Technology

    1992-07-15

    cosmic - ray transport. NASA TM X-2440, 1972:117-122. DoD Space Radiation Concerns 8 2. Atkins SG, Small JT, McFarland TH. Military Man-in Space (MMIS...136. 29. Silberberg R, Tsao CH, Adams JH Jr., Letaw JR. Radiation doses and LET distributions of cosmic rays . Rad. Res., 1984, 98:209-226. 30. Stauber...levels on mission success and completion. Natural Radiation Trapped Radiation Belts Galactic Cosmic Rays (GCR) Solar Particle Events (SPEs) Man-Made

  13. Space station needs, attributes and architectural options. Part 1: Summary

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Candidate missions for the space station were subjected to an evaluation/filtering process which included the application of budgetary constraints and performance of benefits analysis. Results show that the initial space station should be manned, placed in a 28.5 deg orbit, and provide capabilities which include a space test facility, satellite service, a transport harbor, and an observatory. A space industrial park may be added once further development effort validates the cost and expanding commercial market for space-processed material. Using the space station as a national space test facility can enhance national security, as well as commercial and scientific interests alike. The potential accrued gross mission model benefit derived from these capabilities is $5.9B without the industrial park, and $9.3B with it. Other benefits include the lowering of acquisition costs for NASA and DoD space assets and a basis for broadening international participation.

  14. Effect of LEO cycling at shallow depths of discharge on MANTECH IPV nickel-hydrogen cells

    NASA Technical Reports Server (NTRS)

    Smithrick, John J.

    1988-01-01

    An individual pressure vessel nickel-hydrogen battery is being considered as an alternate for a nickel-cadmium battery on the Hubble Space Telescope. The space telescope battery will primarily be operating at a shallow depth of discharge (10 percent DOD) with an occasional 40 percent DOD. This shallow DOD raises several issues: (1) What is the cycle life. It is projected to be acceptable; however, there is no reported real time data base for validation. (2) The state of charge of the nickel electrode at the beginning of charge is 90 percent. Will this cause an acceleration of divergence in the battery individual cell voltages. (3) After prolonged cycling at 10 percent DOD, will there be enough capacity remaining to support the 40 percent DOD. (4) Is the state of charge really 90 percent during cycling. There is no reported real time data base at shallow depths of discharge. A data base to address the above issues was initiated.

  15. A Sediment Testing Reference Area Database for the San Francisco Deep Ocean Disposal Site (SF-DODS)

    EPA Pesticide Factsheets

    EPA established and maintains a SF-DODS reference area database of previously-collected sediment test data. Several sets of sediment test data have been successfully collected from the SF-DODS reference area.

  16. Microbial Monitoring from the Frontlines to Space: A Successful Validation of a Department of Defense (DoD) Funded Small Business Innovation Research (SBIR) Technology on Board the International Space Station (ISS)

    NASA Technical Reports Server (NTRS)

    Oubre, Cherie; Khodadad, Christina; Castro, Victoria; Ott, Mark; Pollack, Lawrence; Roman, Monsi

    2017-01-01

    The RAZOR EX (Registered Trademark) PCR unit was initially developed by the DoD as part of an SBIR project to detect and identify biothreats during field deployment. The system was evaluated by NASA as a commercial technology for future microbial monitoring requirements and has been successfully demonstrated in microgravity on-board the International Space Station.

  17. Laboratory development and testing of spacecraft diagnostics

    NASA Astrophysics Data System (ADS)

    Amatucci, William; Tejero, Erik; Blackwell, Dave; Walker, Dave; Gatling, George; Enloe, Lon; Gillman, Eric

    2017-10-01

    The Naval Research Laboratory's Space Chamber experiment is a large-scale laboratory device dedicated to the creation of large-volume plasmas with parameters scaled to realistic space plasmas. Such devices make valuable contributions to the investigation of space plasma phenomena under controlled, reproducible conditions, allowing for the validation of theoretical models being applied to space data. However, in addition to investigations such as plasma wave and instability studies, such devices can also make valuable contributions to the development and testing of space plasma diagnostics. One example is the plasma impedance probe developed at NRL. Originally developed as a laboratory diagnostic, the sensor has now been flown on a sounding rocket, is included on a CubeSat experiment, and will be included on the DoD Space Test Program's STP-H6 experiment on the International Space Station. In this talk, we will describe how the laboratory simulation of space plasmas made this development path possible. Work sponsored by the US Naval Research Laboratory Base Program.

  18. National space transportation studies

    NASA Technical Reports Server (NTRS)

    Durocher, Cort L.; Irby, Thomas M.; Jenkins, James C.; Gorski, Raymond J.

    1986-01-01

    This paper describes the government and industry activities and findings in response to a Presidential directive to study second-generation space transportation systems. Topics discussed include study purpose, mission needs, architecture development, system concepts, and technology recommendations. Interim study findings will also be presented. The study is being jointly managed by DOD and NASA and equally funded by DOD, NASA, and the Strategic Defense Initiative Organization.

  19. P91-1 ARGOS spacecraft thermal control

    NASA Astrophysics Data System (ADS)

    Sadunas, Jonas; Baginski, Ben; McCarthy, Daniel

    1993-07-01

    The P91-1, or ARGOS, is a Department of Defense funded (DOD) Space Test Program (STP) satellite managed by the Space and Missile Systems Center Space and Small Launch Vehicle Programs Office (SMC/CUL). Rockwell International Space Systems Division is the space vehicle prime contractor. The P91-1 mission is to fly a suite of eight experiments in a 450 nautical mile sun-synchronous orbit dedicated to three dimensional UV imaging of the ionosphere, X-ray source mapping, navigation, space debris characterization, performance characterization of high temperature super conductivity RF devices, and on orbit demonstration of an electrical propulsion system. The primary purpose of this paper is to acquaint the thermal control community, and potential future follow on mission users, with the thermal control characteristics of the spacecraft, experiment/SV thermal integration aspects, and test verification plans.

  20. Emergency medical services

    NASA Technical Reports Server (NTRS)

    Billica, Roger; Chandler, Michael

    1994-01-01

    When NASA was established in 1958, it was known that space flight would require efforts beyond those of NASA to ensure the health and safety of our astronauts. On 10 Aug. 1958, a Secretary of Defense memorandum was signed that assigned the first Department of Defense (DOD) Manager to provide support to NASA for Project Mercury. This established a chain of command through the Joint Chiefs of Staff to the Secretary of Defense. The current charter is dated 19 Mar. 1986 and assigns the DOD Manager responsibilities to the Commander and Chief, US Space Command. The DOD Managers charter has many support areas and among them are recovery of astronauts and medical support. Today these efforts support the Space Shuttle and Space Station Programs. Briefly, the program works with each organization tasking the other through a requirements document. Level of care, communications, and recovery requirements are established; NASA and the DOD provide the capability to meet them. NASA is also responsible for the specialized training and equipment needed to meet these requirements. A Shuttle launch a KSC requires an Emergency Medical Services (EMS) coordinator on console to facilitate communications, ensure proper coverage, and coordinate with area hospitals. A contingent of NASA medical personnel are assembled to provide triage and medical support capabilities. The DOD provides medical evacuation (MEDEVAC) helicopters with surgeons and pararescue specialists (PJ's) or emergency medical technicians (EMT's). Each helicopter is equipped with at least one doctor and one PJ/EMT per astronaut crew member. Transoceanic abort landing (TAL) sites and end of mission (EOM) sites have similar structures, with TAL sites utilizing fixed wingg aircraft for MEDEVAC. The DOD also supports contingency planning for the support and return of crew members from the Space Station Freedom. Much of this support has been directed at the recovery of crew members following the landing of an Assured Crew Return Vehicle.

  1. War-gaming application for future space systems acquisition

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2016-05-01

    Recently the U.S. Department of Defense (DOD) released the Defense Innovation Initiative (DII) [1] to focus DOD on five key aspects; Aspect #1: Recruit talented and innovative people, Aspect #2: Reinvigorate war-gaming, Aspect #3: Initiate long-range research and development programs, Aspect #4: Make DOD practices more innovative, and Aspect #5: Advance technology and new operational concepts. Per DII instruction, this paper concentrates on Aspect #2 and Aspect #4 by reinvigorating the war-gaming effort with a focus on an innovative approach for developing the optimum Program and Technical Baselines (PTBs) and their corresponding optimum acquisition strategies for acquiring future space systems. The paper describes a unified approach for applying the war-gaming concept for future DOD acquisition of space systems. The proposed approach includes a Unified Game-based Acquisition Framework (UGAF) and an Advanced Game-Based Mathematical Framework (AGMF) using Bayesian war-gaming engines to optimize PTB solutions and select the corresponding optimum acquisition strategies for acquiring a space system. The framework defines the action space for all players with a complete description of the elements associated with the games, including Department of Defense Acquisition Authority (DAA), stakeholders, warfighters, and potential contractors, War-Gaming Engines (WGEs) played by DAA, WGEs played by Contractor (KTR), and the players' Payoff and Cost functions (PCFs). The AGMF presented here addresses both complete and incomplete information cases. The proposed framework provides a recipe for the DAA and USAF-Space and Missile Systems Center (SMC) to acquire future space systems optimally.

  2. Personnel Recovery in Space: A New Venture for Human Space Flight Support

    DTIC Science & Technology

    2016-05-01

    research paper are those of the author and do not reflect the official policy or position of the US government or the Department of Defense . In...iii Abstract This paper will define Personnel Recovery (PR) and the construct in which the Department of Defense (DoD) currently operates...Service Core Function." Air and Space Power Journal, 2011.p8. 3 3-50, Department of Defense (DOD) Joint Publication. "Personnel Recovery." Oct 2, 2015

  3. Advanced nickel-hydrogen spacecraft battery development

    NASA Technical Reports Server (NTRS)

    Coates, Dwaine K.; Fox, Chris L.; Standlee, D. J.; Grindstaff, B. K.

    1994-01-01

    Eagle-Picher currently has several advanced nickel-hydrogen (NiH2) cell component and battery designs under development including common pressure vessel (CPV), single pressure vessel (SPV), and dependent pressure vessel (DPV) designs. A CPV NiH2 battery, utilizing low-cost 64 mm (2.5 in.) cell diameter technology, has been designed and built for multiple smallsat programs, including the TUBSAT B spacecraft which is currently scheduled (24 Nov. 93) for launch aboard a Russian Proton rocket. An advanced 90 mm (3.5 in.) NiH2 cell design is currently being manufactured for the Space Station Freedom program. Prototype 254 mm (10 in.) diameter SPV batteries are currently under construction and initial boilerplate testing has shown excellent results. NiH2 cycle life testing is being continued at Eagle-Picher and IPV cells have currently completed more than 89,000 accelerated LEO cycles at 15% DOD, 49,000 real-time LEO cycles at 30 percent DOD, 37,800 cycles under a real-time LEO profile, 30 eclipse seasons in accelerated GEO, and 6 eclipse seasons in real-time GEO testing at 75 percent DOD maximum. Nickel-metal hydride battery development is continuing for both aerospace and electric vehicle applications. Eagle-Picher has also developed an extensive range of battery evaluation, test, and analysis (BETA) measurement and control equipment and software, based on Hewlett-Packard computerized data acquisition/control hardware.

  4. Space Congress, 27th, Cocoa Beach, FL, Apr. 24-27, 1990, Proceedings

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The present symposium on aeronautics and space encompasses DOD research and development, science payloads, small microgravity carriers, the Space Station, technology payloads and robotics, commercial initiatives, STS derivatives, space exploration, and DOD space operations. Specific issues addressed include the use of AI to meet space requirements, the Astronauts Laboratory Smart Structures/Skins Program, the Advanced Liquid Feed Experiment, an overview of the Spacelab program, the Autonomous Microgravity Industrial Carrier Initiative, and the Space Station requirements and transportation options for a lunar outpost. Also addressed are a sensor-data display for telerobotic systems, the Pegasus and Taurus launch vehicles, evolutionary transportation concepts, the upgrade of the Space Shuttle avionics, space education, orbiting security sentinels, and technologies for improving launch-vehicle responsiveness.

  5. The October 1973 space shuttle traffic model, revision 2

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Traffic model data for the space shuttle for calendar years 1980 through 1991 are presented along with some supporting and summary data. This model was developed from the 1973 NASA Payload Model, dated October 1973, and the NASA estimate of the 1973 Non-NASA/Non-DoD Payload Model. The estimates for the DoD flights included are based on the 1971 DoD Mission Model.

  6. Department of Defense International Space Cooperation Strategy

    DTIC Science & Technology

    2017-01-01

    Secretary of Defense on .January 18. 2017. the unclassified version provides DoD’s approach for invigorating cooperation and collaboration with trusted ...Cooperation Strategy (ISCS) establishes DoD’ s approach for invigorating cooperation and collaboration with trusted allies and partners across the...collaborating with trusted allies and partners to address shared security challenges by leveraging allies’ and partners ’ capabilities to enhance space mission

  7. Alternative to Nitric Acid for Passivation of Stainless Steel Alloys

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie L.; Kolody, Mark; Curran, Jerry

    2013-01-01

    Corrosion is an extensive problem that affects the Department of Defense (DoD) and National Aeronautics and Space Administration (NASA). The deleterious effects of corrosion result in steep costs, asset downtime affecting mission readiness, and safety risks to personnel. Consequently, it is vital to reduce corrosion costs and risks in a sustainable manner. The DoD and NASA have numerous structures and equipment that are fabricated from stainless steel. The standard practice for protection of stainless steel is a process called passivation. Typical passivation procedures call for the use of nitric acid; however, there are a number of environmental, worker safety, and operational issues associated with its use. Citric acid offers a variety of benefits including increased safety for personnel, reduced environmental impact, and reduced operational cost. DoD and NASA agreed to collaborate to validate citric acid as an acceptable passivating agent for stainless steel. This paper details our investigation of prior work developing the citric acid passivation process, development of the test plan, optimization of the process for specific stainless steel alloys, ongoing and planned testing to elucidate the process' resistance to corrosion in comparison to nitric acid, and preliminary results.

  8. Nuclear Electric Propulsion Technology Panel findings and recommendations

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.

    1992-01-01

    Summarized are the findings and recommendations of a triagency (NASA/DOE/DOD) panel on Nuclear Electric Propulsion (NEP) Technology. NEP has been identified as a candidate nuclear propulsion technology for exploration of the Moon and Mars as part of the Space Exploration Initiative (SEI). The findings are stated in areas of system and subsystem considerations, technology readiness, and ground test facilities. Recommendations made by the panel are summarized concerning: (1) existing space nuclear power and propulsion programs, and (2) the proposed multiagency NEP technology development program.

  9. 32 CFR 223.6 - Procedures-identifying and controlling DoD UCNI.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... information could reasonably be expected to have an adverse effect on the health and safety of the public or... nuclear weapons in DoD custody. This is called the “adverse effects test.” (2) DoD UCNI shall be... adverse effects test. (2) Information shall be protected as DoD UCNI if it qualifies for one or more of...

  10. 32 CFR 223.6 - Procedures-identifying and controlling DoD UCNI.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... information could reasonably be expected to have an adverse effect on the health and safety of the public or... nuclear weapons in DoD custody. This is called the “adverse effects test.” (2) DoD UCNI shall be... adverse effects test. (2) Information shall be protected as DoD UCNI if it qualifies for one or more of...

  11. DoD Civilian Drug Abuse Testing Program

    DTIC Science & Technology

    1988-08-23

    employee assistance programs ( EAPs ). DoD Components must obtain approval of the ASD(HA) for specimen collection and laboratory testing... Employee . A DoD employee paid from appropriated funds. 2. Employee Assistance Programs ( EAPs ). DoD Component-based counseling programs that offer...Renumber Ś." to ř." Subparagraph E.5.a.(2), line 1. After "(2)" insert " Employee Assistance Programs " and enclose "

  12. Marshall Space Flight Center's Impact Testing Facility Capabilities

    NASA Technical Reports Server (NTRS)

    Evans, Steve; Finchum, Andy; Hubbs, Whitney; Gray, Perry

    2008-01-01

    Marshall Space Flight Center's (MSFC) Impact Testing Facility (ITF) serves as an important installation for space and missile related materials science research. The ITF was established and began its research in spacecraft debris shielding in the early 1960s, then played a major role in the International Space Station debris shield development. As NASA became more interested in launch debris and in-flight impact concerns, the ITF grew to include research in a variety of impact genres. Collaborative partnerships with the DoD led to a wider range of impact capabilities being relocated to MSFC as a result of the closure of Particle Impact Facilities in Santa Barbara, California, The Particle Impact Facility had a 30 year history in providing evaluations of aerospace materials and components during flights through rain, ice, and solid particle environments at subsonic through hypersonic velocities. The facility's unique capabilities were deemed a 'National Asset' by the DoD, The ITF now has capabilities including environmental, ballistic, and hypervelocity impact testing utilizing an array of air, powder, and two-stage light gas guns to accommodate a variety of projectile and target types and sizes. Relocated test equipment was dated and in need of upgrade. Numerous upgrades including new instrumentation, triggering circuitry, high speed photography, and optimized sabot designs have been implemented. Other recent research has included rain drop demise characterization tests to obtain data for inclusion in on-going model development. Future ITF improvements will be focused on continued instrumentation and performance enhancements. These enhancements will allow further, more in-depth, characterization of rain drop demise characterization and evaluation of ice crystal impact. Performance enhancements also include increasing the upper velocity limit of the current environmental guns to allow direct environmental simulation for missile components. The current and proposed ITF capabilities range from rain to micrometeoroids allowing the widest test parameter range possible for materials investigations in support of space, atmospheric, and ground environments. These test capabilities including hydrometeor, single/multi-particle, ballistic gas guns, exploding wire gun, and light gas guns combined with Smooth Particle Hydrodynamics Code (SPHC) simulations represent the widest range of impact test capabilities in the country.

  13. Marshall Space Flight Center's Impact Testing Facility Capabilities

    NASA Technical Reports Server (NTRS)

    Evans, Steve; Finchum, Andy; Hubbs, Whitney

    2008-01-01

    Marshall Space Flight Center's (MSFC) Impact Testing Facility (ITF) serves as an important installation for space and missile related materials science research. The ITF was established and began its research in spacecraft debris shielding in the early 1960% then played a major role in the International Space Station debris shield development. As NASA became more interested in launch debris and in-flight impact concerns, the ITF grew to include research in a variety of impact genres. Collaborative partnerships with the DoD led to a wider range of impact capabilities being relocated to MSFC as a result of the closure of Particle Impact Facilities in Santa Barbara, California. The Particle Impact Facility had a 30 year history in providing evaluations of aerospace materials and components during flights through rain, ice, and solid particle environments at subsonic through hypersonic velocities. The facility's unique capabilities were deemed a "National Asset" by the DoD. The ITF now has capabilities including environmental, ballistic, and hypervelocity impact testing utilizing an array of air, powder, and two-stage light gas guns to accommodate a variety of projectile and target types and sizes. Relocated test equipment was dated and in need of upgrade. Numerous upgrades including new instrumentation, triggering circuitry, high speed photography, and optimized sabot designs have been implemented. Other recent research has included rain drop demise characterization tests to obtain data for inclusion in on-going model development. Future ITF improvements will be focused on continued instrumentation and performance enhancements. These enhancements will allow further, more in-depth, characterization of rain drop demise characterization and evaluation of ice crystal impact. Performance enhancements also include increasing the upper velocity limit of the current environmental guns to allow direct environmental simulation for missile components. The current and proposed ITF capabilities range from rain to micrometeoroids allowing the widest test parameter range possible for materials investigations in support of space, atmospheric, and ground environments. These test capabilities including hydrometeor, single/multi-particle, ballistic gas grins, exploding wire gun, and light gas guns combined with Smooth Particle Hydrodynamics Code (SPHC) simulations represent the widest range of impact test capabilities in the country.

  14. Nickel hydrogen low Earth orbit life testing

    NASA Technical Reports Server (NTRS)

    Badcock, C. C.; Haag, R. L.

    1986-01-01

    A program to demonstrate the long term reliability of NiH2 cells in low Earth orbits (LEO) and support use in mid-altitude orbits (MAO) was initiated. Both 3.5 and 4.5 inch diameter nickel hydrogen cells are included in the test plan. Cells from all U.S. vendors are to be tested. The tests will be performed at -5 and 10 C at 40 and 60% DOD for LEO orbit and 10 C and 80% DOD for MAO orbit simulations. The goals of the testing are 20,000 cycles at 60% DOD and 30,000 cycles at 40% DOD. Cells are presently undergoing acceptance and characterization testing at Naval Weapons Systems Center, Crane.

  15. Analyzing Systems Integration Best Practices and Assessment in DoD Space Systems Acquisition

    DTIC Science & Technology

    2009-12-01

    satellite  Insufficient stress relief and insulation caused abrasion of wiring harness. C Product–Product: stress relief and insulation – wiring...delaminated during firing . This problem escaped qualification since slow heating rates (0.1–deg F/sec) used in the lab test provided time for the gas...to escape. Faster rates would have revealed the issue. E Product–Process: material – replace, firing ; rate – test B Process–Process: replace

  16. Defense AT and L Magazine. Volume 47, Number 2, March-April 2018

    DTIC Science & Technology

    2018-03-01

    laboratories, they are easily trans- ferable to government organizations and industry efforts to solve problems and improve the management of projects ...Instead, the change can occur at the funda- mental management level by suggesting a new, innovative way to lead DoD space projects . One DoD space program...payloads and managed services that can fill military needs. ALSO 20 MDAP/MAIS Program Manager Changes 42 2017 Defense Acquisition Workforce Awards

  17. Analysis of Light Emitting Diode Technology for Aerospace Suitability in Human Space Flight Applications

    NASA Astrophysics Data System (ADS)

    Treichel, Todd H.

    Commercial space designers are required to manage space flight designs in accordance with parts selections made from qualified parts listings approved by Department of Defense and NASA agencies for reliability and safety. The research problem was a government and private aerospace industry problem involving how LEDs cannot replace existing fluorescent lighting in manned space flight vehicles until such technology meets DOD and NASA requirements for reliability and safety, and effects on astronaut cognition and health. The purpose of this quantitative experimental study was to determine to what extent commercial LEDs can suitably meet NASA requirements for manufacturer reliability, color reliability, robustness to environmental test requirements, and degradation effects from operational power, while providing comfortable ambient light free of eyestrain to astronauts in lieu of current fluorescent lighting. A fractional factorial experiment tested white and blue LEDs for NASA required space flight environmental stress testing and applied operating current. The second phase of the study used a randomized block design, to test human factor effects of LEDs and a qualified ISS fluorescent for retinal fatigue and eye strain. Eighteen human subjects were recruited from university student members of the American Institute of Aeronautics and Astronautics. Findings for Phase 1 testing showed that commercial LEDs met all DOD and NASA requirements for manufacturer reliability, color reliability, robustness to environmental requirements, and degradation effects from operational power. Findings showed statistical significance for LED color and operational power variables but degraded light output levels did not fall below the industry recognized <70%. Findings from Phase 2 human factors testing showed no statistically significant evidence that the NASA approved ISS fluorescent lights or blue or white LEDs caused fatigue, eye strain and/or headache, when study participants perform detailed tasks of reading and assembling mechanical parts for an extended period of two uninterrupted hours. However, human subjects self-reported that blue LEDs provided the most white light and the favored light source over the white LED and the ISS fluorescent as a sole artificial light source for space travel. According to NASA standards, findings from this study indicate that LEDs meet criteria for the NASA TRL 7 rating, as study findings showed that commercial LED manufacturers passed the rigorous testing standards of suitability for space flight environments and human factor effects. Recommendations for future research include further testing for space flight using the basis of this study for replication, but reduce study limitations by 1) testing human subjects exposure to LEDs in a simulated space capsule environment over several days, and 2) installing and testing LEDs in space modules being tested for human spaceflight.

  18. Advanced space program studies. Overall executive summary

    NASA Technical Reports Server (NTRS)

    Wolfe, M. G.

    1977-01-01

    NASA and DoD requirements and planning data were used in multidiscipline advanced planning investigations of space operations and associated elements (including man), identification of potential low cost approaches, vehicle design, cost synthesis techniques, technology forecasting and opportunities for DoD technology transfer, and the development near-, mid-, and far-term space initiatives and development plans with emphasis on domestic and military commonality. An overview of objectives and results are presented for the following studies: advanced space planning and conceptual analysis, shuttle users, technology assessment and new opportunities, standardization and program practice, integrated STS operations planning, solid spinning upper stage, and integrated planning support functions.

  19. Space exploration initiative (SEI) logistics support lessons from the DoD

    NASA Astrophysics Data System (ADS)

    Cox, John R.; McCoy, Walbert G.; Jenkins, Terence

    Proven and innovative logistics management approaches and techniques used for developing and supporting DoD and Strategic Defense Initiative Office (SDIO) systems are described on the basis of input from DoD to the SEI Synthesis Group; SDIO-developed logistics initiatives, innovative tools, and methodologies; and logistics planning support provided to the NASA/Johnson Planet Surface System Office. The approach is tailored for lunar/Martian surface operations, and provides guidelines for the development and management of a crucial element of the SEI logistics support program. A case study is presented which shows how incorporation of DoD's proven and innovative logistics management approach, tools, and techniques can substantially benefit early logistics planning for SEI, while also implementing many of DoD's recommendations for SEI.

  20. Overview of free-piston Stirling technology at the NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Slaby, J. G.

    1985-01-01

    An overview of the National Aeronautics and Space Administration (NASA) Lewis Research Center (Lewis) free-piston Stirling engine activities is presented. These activities include: (1) a generic free-piston Stirling technology project being conducted to develop technologies synergistic to both space power and terrestrial heat pump applications in a cooperative, cost-shared effort with the Department of Energy (DOE/Oak Ridge National Laboratory (ONRL)), and (2) a free-piston Stirling space-power technology demonstration project as part of the SP-100 program being conducted in support of the Department of Defense (DOD), DOE, and NASA/Lewis. The generic technology effort includes extensive parametric testing of a 1 kw free-piston Stirling engine (RE-1000), development and validation of a free-piston Stirling performance computer code, and fabrication and initial testing of an hydraulic output modification for the RE-1000 engine. The space power technology effort, under SP-100, addresses the status of the 25 kWe Space Power Demonstrator Engine (SPDE) including early test results.

  1. Next Generation JPL Ultra-Stable Trapped Ion Atomic Clocks

    NASA Technical Reports Server (NTRS)

    Burt, Eric; Tucker, Blake; Larsen, Kameron; Hamell, Robert; Tjoelker, Robert

    2013-01-01

    Over the past decade, trapped ion atomic clock development at the Jet Propulsion Laboratory (JPL) has focused on two directions: 1) new atomic clock technology for space flight applications that require strict adherence to size, weight, and power requirements, and 2) ultra-stable atomic clocks, usually for terrestrial applications emphasizing ultimate performance. In this paper we present a new ultra-stable trapped ion clock designed, built, and tested in the second category. The first new standard, L10, will be delivered to the Naval Research Laboratory for use in characterizing DoD space clocks.

  2. 78 FR 37684 - Federal Acquisition Regulation; Interagency Acquisitions: Compliance by Nondefense Agencies With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... With Defense Procurement Requirements AGENCY: Department of Defense (DoD), General Services... agencies on behalf of DoD. This rule implements a section of the National Defense Authorization Act (NDAA...

  3. 76 FR 41179 - Federal Acquisition Regulation; Biobased Procurements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... Services Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Proposed rule. SUMMARY: DoD, GSA, and NASA are proposing to amend the Federal Acquisition Regulation (FAR) to.... SUPPLEMENTARY INFORMATION: I. Background DoD, GSA, and NASA are proposing to amend the Federal Acquisition...

  4. Leveraging Social Networking in the United States Army

    DTIC Science & Technology

    2011-03-16

    ABSTRACT In 2007, the U. S. Department of Defense (DoD) began blocking social networking sites such as including YouTube and MySpace from its computer...issued a memorandum that set a new policy allowing access to social - networking services ( SNS ) from its network . The policy allows all users of...CLASSIFICATION: Unclassified In 2007, the U. S. Department of Defense (DoD) began blocking social networking sites such as including YouTube and MySpace

  5. Into the Unknown Together. The DOD, NASA, and Early Spaceflight

    DTIC Science & Technology

    2005-09-01

    achieve greater independence by lessening its reliance on the DOD over these 12 years? Equally important to the NASA- DOD relationship was the...first annual report. That 1948 report stated, “The Earth Satellite Vehicle Program, which was being carried out independently by each military service...Wernher von Braun did muse, “Suppose a National Space Agency were set up, either under the Secretary of Defense or as an independent agency, and this agency

  6. Paving the Way for Small Satellite Access to Orbit: Cyclops' Deployment of SpinSat, the Largest Satellite Ever Deployed from the International Space Station

    NASA Technical Reports Server (NTRS)

    Hershey, Matthew P.; Newswander, Daniel R.; Smith, James P.; Lamb, Craig R.; Ballard, Perry G.

    2015-01-01

    The Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS), known as "Cyclops" to the International Space Station (ISS) community, successfully deployed the largest satellite ever (SpinSat) from the ISS on November 28, 2014. Cyclops, a collaboration between the NASA ISS Program, NASA Johnson Space Center Engineering, and Department of Defense Space Test Program (DoD STP) communities, is a dedicated 10-100 kg class ISS small satellite deployment system. This paper will showcase the successful deployment of SpinSat from the ISS. It will also outline the concept of operations, interfaces, requirements, and processes for satellites to utilize the Cyclops satellite deployment system.

  7. NASA/MSFC ground experiment for large space structure control verification

    NASA Technical Reports Server (NTRS)

    Waites, H. B.; Seltzer, S. M.; Tollison, D. K.

    1984-01-01

    Marshall Space Flight Center has developed a facility in which closed loop control of Large Space Structures (LSS) can be demonstrated and verified. The main objective of the facility is to verify LSS control system techniques so that on orbit performance can be ensured. The facility consists of an LSS test article which is connected to a payload mounting system that provides control torque commands. It is attached to a base excitation system which will simulate disturbances most likely to occur for Orbiter and DOD payloads. A control computer will contain the calibration software, the reference system, the alignment procedures, the telemetry software, and the control algorithms. The total system will be suspended in such a fashion that LSS test article has the characteristics common to all LSS.

  8. INFLIGHT (MISSION CONTROL CENTER [MCC]) - STS-1 - ELLINGTON AFB (EAFB), TX

    NASA Image and Video Library

    1981-04-13

    S81-32876 (13 April 1981) --- Brig. Gen. William T. Twinting studies the monitor at the Department of Defense (DOD) console in the mission operations control room (MOCR) at the Johnson Space Center?s Mission Control Center (MCC). He is deputy DOD manager for Space Shuttle Support Operations. Gen. Twinting and the other flight controllers seen in the background listen as astronaut John W. Young, STS-1 commander, describes the scenery of a downlink TV transmission. Photo credit: NASA

  9. DOD/NASA system impact analysis (study 2.1). Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Results of the tug turnaround cost study and the space transportation system (STS) abort modes and effects study are presented for DOD/NASA system impact analysis. Cost estimates are given for tug turnabout; and vehicle description, abort assessment, and abort performance capability are given for the STS.

  10. Operations Nougat and Whetstone events: Hard Hat, Danny Boy, Marshmallow, Mudpack, Wishbone, Gumdrop, Diluted Waters, and Tiny Tot, 15 February 1962-17 June 1965. Final report 15 Feb 62-19 Jun 68

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brady, W.J.; Horton, K.K.; Eubank, B.F.

    1984-01-31

    This report is a personnel oriented history of DOD participation in underground nuclear weapons testing during Operations NOUGAT and WHETSTONE, test events HARD HAT, DANNY BOY, MARSHMALLOW, MUDPACK, WISHBONE, GUMDROP, DILUTED WATERS, and TINY TOT. It is the first in a series of historical reports which will include all DOD underground nuclear weapons tests and DOE underground nuclear weapons tests with significant DOD participation from 1962 forward. In addition to these volumes presenting a history of the underground nuclear test program, a later restricted volume will identify all DOD participants, (military, civilian, and their contractors) and will list their dosimetrymore » data.« less

  11. Capabilities of the Impact Testing Facility at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Finchum, Andy; Nehls, Mary; Young, Whitney; Gray, Perry; Suggs, Bart; Lowrey, Nikki M.

    2011-01-01

    The test and analysis capabilities of the Impact Testing Facility at NASA's Marshall Space Flight Center are described. Nine different gun systems accommodate a wide range of projectile and target sizes and shapes at velocities from subsonic through hypersonic, to accomplish a broad range of ballistic and hypervelocity impact tests. These gun systems include ballistic and microballistic gas and powder guns, a two-stage light gas gun, and specialty guns for weather encounter studies. The ITF "rain gun" is the only hydrometeor impact gun known to be in existence in the United States that can provide single impact performance data with known raindrop sizes. Simulation of high velocity impact is available using the Smooth Particle Hydrodynamic Code. The Impact Testing Facility provides testing, custom test configuration design and fabrication, and analytical services for NASA, the Department of Defense, academic institutions, international space agencies, and private industry in a secure facility located at Marshall Space Flight Center, on the US Army's Redstone Arsenal in Huntsville, Alabama. This facility performs tests that are subject to International Traffic in Arms Regulations (ITAR) and DoD secret classified restrictions as well as proprietary and unrestricted tests for civil space agencies, academic institutions, and commercial aerospace and defense companies and their suppliers.

  12. Random-Walk Model of Diffusion in Three Dimensions in Brain Extracellular Space: Comparison with Microfiberoptic Photobleaching Measurements

    PubMed Central

    Jin, Songwan; Zador, Zsolt; Verkman, A. S.

    2008-01-01

    Diffusion through the extracellular space (ECS) in brain is important in drug delivery, intercellular communication, and extracellular ionic buffering. The ECS comprises ∼20% of brain parenchymal volume and contains cell-cell gaps ∼50 nm. We developed a random-walk model to simulate macromolecule diffusion in brain ECS in three dimensions using realistic ECS dimensions. Model inputs included ECS volume fraction (α), cell size, cell-cell gap geometry, intercellular lake (expanded regions of brain ECS) dimensions, and molecular size of the diffusing solute. Model output was relative solute diffusion in water versus brain ECS (Do/D). Experimental Do/D for comparison with model predictions was measured using a microfiberoptic fluorescence photobleaching method involving stereotaxic insertion of a micron-size optical fiber into mouse brain. Do/D for the small solute calcein in different regions of brain was in the range 3.0–4.1, and increased with brain cell swelling after water intoxication. Do/D also increased with increasing size of the diffusing solute, particularly in deep brain nuclei. Simulations of measured Do/D using realistic α, cell size and cell-cell gap required the presence of intercellular lakes at multicell contact points, and the contact length of cell-cell gaps to be least 50-fold smaller than cell size. The model accurately predicted Do/D for different solute sizes. Also, the modeling showed unanticipated effects on Do/D of changing ECS and cell dimensions that implicated solute trapping by lakes. Our model establishes the geometric constraints to account quantitatively for the relatively modest slowing of solute and macromolecule diffusion in brain ECS. PMID:18469079

  13. Random-walk model of diffusion in three dimensions in brain extracellular space: comparison with microfiberoptic photobleaching measurements.

    PubMed

    Jin, Songwan; Zador, Zsolt; Verkman, A S

    2008-08-01

    Diffusion through the extracellular space (ECS) in brain is important in drug delivery, intercellular communication, and extracellular ionic buffering. The ECS comprises approximately 20% of brain parenchymal volume and contains cell-cell gaps approximately 50 nm. We developed a random-walk model to simulate macromolecule diffusion in brain ECS in three dimensions using realistic ECS dimensions. Model inputs included ECS volume fraction (alpha), cell size, cell-cell gap geometry, intercellular lake (expanded regions of brain ECS) dimensions, and molecular size of the diffusing solute. Model output was relative solute diffusion in water versus brain ECS (D(o)/D). Experimental D(o)/D for comparison with model predictions was measured using a microfiberoptic fluorescence photobleaching method involving stereotaxic insertion of a micron-size optical fiber into mouse brain. D(o)/D for the small solute calcein in different regions of brain was in the range 3.0-4.1, and increased with brain cell swelling after water intoxication. D(o)/D also increased with increasing size of the diffusing solute, particularly in deep brain nuclei. Simulations of measured D(o)/D using realistic alpha, cell size and cell-cell gap required the presence of intercellular lakes at multicell contact points, and the contact length of cell-cell gaps to be least 50-fold smaller than cell size. The model accurately predicted D(o)/D for different solute sizes. Also, the modeling showed unanticipated effects on D(o)/D of changing ECS and cell dimensions that implicated solute trapping by lakes. Our model establishes the geometric constraints to account quantitatively for the relatively modest slowing of solute and macromolecule diffusion in brain ECS.

  14. Effect of storage and LEO cycling on manufacturing technology IPV nickel-hydrogen cells

    NASA Technical Reports Server (NTRS)

    Smithrick, John J.

    1987-01-01

    Yardney Manufacturing Technology (MANTECH) 50 A-hr space weight individual pressure vessel nickel-hydrogen cells were evaluated. This consisted of investigating: the effect of storage and charge/discharge cycling on cell performance. For the storage test the cells were precharged with hydrogen, by the manufacturer, to a pressure of 14.5 psia. After undergoing activation and acceptance tests, the cells were discharged at C/10 rate (5A) to 0.1 V or less. The terminals were then shorted. The cells were shipped to NASA Lewis Research Center where they were stored at room temperature in the shorted condition for 1 year. After storage, the acceptance tests were repeated at NASA Lewis. A comparison of test results indicate no significant degradation in electrical performance due to 1 year storage. For the cycle life test the regime was a 90 minute low earth orbit at deep depths of discharge (80 and 60 percent). At the 80 percent DOD the three cells failed on the average at cycle 741. Failure for this test was defined to occur when the cell voltage degraded to 1 V prior to completion of the 35 min discharge. The DOD was reduced to 60 percent. The cycle life test was continued.

  15. Defense Acquisition Workforce: The Air Force Needs to Evaluate Changes in Funding for Civilians Engaged in Space Acquisition

    DTIC Science & Technology

    2013-07-01

    1) revitalize the acquisition workforce; (2) improve the requirements generation process; (3) instill budget and financial DOD Acquisition...with our four recommended actions (see app . I). In concurring with our recommendations, DOD stated that the Air Force will evaluate the pilot program

  16. SAFT nickel-cadmium cell performances for GEO and LEO applications

    NASA Technical Reports Server (NTRS)

    Puig, Olivier

    1991-01-01

    The following topics are covered in viewgraph format: test matrix and cycling status; test results at 30 percent depth of discharge (DOD); test results at 40 percent DOD; capacity evolution; and dissipated power evolution.

  17. Advanced space power requirements and techniques. Task 1: Mission projections and requirements. Volume 1: Technical report

    NASA Technical Reports Server (NTRS)

    Wolfe, M. G.

    1978-01-01

    The objectives of this study were to: (1) develop projections of the NASA, DoD, and civil space power requirements for the 1980-1995 time period; (2) identify specific areas of application and space power subsystem type needs for each prospective user; (3) document the supporting and historical base, including relevant cost related measures of performance; and (4) quantify the benefits of specific technology projection advancements. The initial scope of the study included: (1) construction of likely models for NASA, DoD, and civil space systems; (2) generation of a number of future scenarios; (3) extraction of time phased technology requirements based on the scenarios; and (4) cost/benefit analyses of some of the technologies identified.

  18. Operations FLINTLOCK and LATCHKEY events RED HOT, PIN STRIPE, DISCUS THROWER, PILE DRIVER, DOUBLE PLAY, NEWPOINT, MIDI MIST, 5 March 1966-26 Jun 1967. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Horton, K.K.; Eubank, B.F.; Brady, W.J.

    1984-10-01

    This report is a personnel-oriented history of DOD participation in underground nuclear weapons testing during Operations FLINTLOCK and LATCHKEY, test events RED HOT, PIN STRIPE, DISCUS THROWER, PILE DRIVER, DOUBLE PLAY, NEW POINT, and MIDI MIST, from 5 March 1966 to 26 June 1967. It is the second in a series of historical reports which will include all DOD underground nuclear weapons tests and all DOE underground nuclear weapons tests with significant DOD participation from 1962 forward. In addition to these historical volumes, a later restricted distribution volume will identify all DOD participants (military, civilian, and civilian contractors) and willmore » list their radiation dosimetry data.« less

  19. Capacity fading of LiAlyNi1-x-yCoxO2 cathode for lithium-ion batteries during accelerated calendar and cycle life tests (effect of depth of discharge in charge-discharge cycling on the suppression of the micro-crack generation of LiAlyNi1-x-yCoxO2 particle)

    NASA Astrophysics Data System (ADS)

    Watanabe, Shoichiro; Kinoshita, Masahiro; Hosokawa, Takashi; Morigaki, Kenichi; Nakura, Kensuke

    2014-08-01

    Cycle performance of a LiAl0.10Ni0.76Co0.14O2 (NCA) cathode/graphite cell closely depended on the range of depth of discharge in charge-discharge processes (ΔDOD). When ΔDOD was 10-70%, cycle performance at 25 °C was maintained even at 60 °C. Deterioration phenomena were analyzed by electrochemical method, X-ray photoelectron spectroscopy (XPS), X-ray diffractometry (XRD), and micro-cracks in NCA particles were analyzed with cross-sectional views by scanning electron microscopy (SEM). Many micro-cracks were observed only after a 0-100% DOD region cycle test. Cycle tests in several restricted ΔDOD conditions showed that the deterioration was closely related to not the upper and lower limits of DOD or operation voltage but the width of ΔDOD.

  20. Approaches to dealing with meteoroid and orbital debris protection on the Space Station

    NASA Technical Reports Server (NTRS)

    Kessler, Donald J.

    1990-01-01

    Viewgraphs and discussion on approaches to dealing with meteoroid and orbital debris protection on the space station are presented. The National Space Policy of February, 1988, included the following: 'All sectors will seek to minimize the creation of space debris. Design and operations of space tests, experiments, and systems will strive to minimize or reduce accumulation of space debris consistent with mission requirements and cost effectiveness.' The policy also tasked the National Security Council, which established an Interagency Group, which in turn produced an Interagency Report. NASA and DoD tasks to establish a joint plan to determine techniques to measure the environment, and techniques to reduce the environment are addressed. Topics covered include: orbital debris environment, meteoroids, orbital debris population, cataloged earth satellite population, USSPACECOM cataloged objects, and orbital debris radar program.

  1. What Makes Fusion Cells Effective?

    DTIC Science & Technology

    2009-12-01

    83 Figure 18. Breusch - Pagan Test for Overall Model ...........................................................83 Figure 19. Ramsey Test for Overall...Probability Norm for DoD Model IV5 ............................................................89 Figure 31. Breusch - Pagan Test for DoD Model... Breusch - Pagan Test for State and Local Model ..............................................95 Figure 45. Ramsey Test for State and Local Model

  2. DoD Major Automated Information Systems: Improvements Can Be Made in Applying Leading Practices for Managing Risk and Testing

    DTIC Science & Technology

    2017-03-01

    Government Accountability Office Highlights of GAO-17-322, a report to congressional committees March 2017 DOD MAJOR AUTOMATED INFORMATION ...DOD MAJOR AUTOMATED INFORMATION SYSTEMS Improvements Can Be Made in Applying Leading Practices for Managing Risk and...Testing Report to Congressional Committees March 2017 GAO-17-322 United States Government Accountability Office United States

  3. SpaceFibre Discussion

    NASA Technical Reports Server (NTRS)

    Rakow, Glenn

    2007-01-01

    This viewgraph presentation discusses the future use of SpaceFibre, a high speed optical extension to the SpaceWire, for NASA and DOD missions. NASA, and US industries would like to work with the European developers currently working on this standard.

  4. 75 FR 19168 - Federal Acquisition Regulation; FAR Case 2009-005, Use of Project Labor Agreements for Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... located on Indian reservations. Response: GSA, DoD, and NASA have clarified in the final rule that project... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Final rule. SUMMARY: GSA, DOD, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to implement...

  5. 76 FR 14559 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...

  6. Capabilities of the Environmental Effects Branch at Marshall Space Flight Cente

    NASA Technical Reports Server (NTRS)

    Rogers, Jan; Finckenor, Miria; Nehls, Mary

    2016-01-01

    The Environmental Effects Branch at the Marshall Space Flight Center supports a myriad array of programs for NASA, DoD, and commercial space including human exploration, advanced space propulsion, improving life on Earth, and the study of the Sun, the Earth, and the solar system. The branch provides testing, evaluation, and qualification of materials for use on external spacecraft surfaces and in contamination-sensitive systems. Space environment capabilities include charged particle radiation, ultraviolet radiation, atomic oxygen, impact, plasma, and thermal vacuum, anchored by flight experiments and analysis of returned space hardware. These environmental components can be combined for solar wind or planetary surface environment studies or to evaluate synergistic effects. The Impact Testing Facility allows simulation of impacts ranging from sand and rain to micrometeoroids and orbital debris in order to evaluate materials and components for flight and ground-based systems. The Contamination Control Team is involved in the evaluation of environmentally-friendly replacements for HCFC-225 for use in propulsion oxygen systems, developing cleaning methods for additively manufactured hardware, and reducing risk for the Space Launch System.

  7. NASA/DOD Control/Structures Interaction Technology, 1986

    NASA Technical Reports Server (NTRS)

    Wright, Robert L. (Compiler)

    1987-01-01

    Papers presented at the CSI Technology Conference are given. The conference was jointly sponsored by the NASA Office of Aeronautics and Space Technology and the Department of Defense. The conference is the beginning of a series of annual conferences whose purpose is to report to industry, academia, and government agencies the current status of Control/Structures Interaction technology. The conference program was divided into five sessions: (1) Future spacecraft requirements; Technology issues and impact; (2) DOD special topics; (3) Large space systems technology; (4) Control of flexible structures, and (5) Selected NASA research in control structures interaction.

  8. Advanced Space Transportation Program (ASTP)

    NASA Image and Video Library

    1995-01-23

    Pictured here is a DC-XA Reusable Launch Vehicle (RLV) prototype concept with an RLV logo. The Delta Clipper-Experimental (DC-X) was originally developed by McDornell Douglas for the Department of Defense (DOD). The DC-XA is a single-stage-to-orbit, vertical takeoff/vertical landing, launch vehicle concept, whose development is geared to significantly reduce launch costs and will provide a test bed for NASA Reusable Launch Vehicle (RLV) technology as the Delta Clipper-Experimental Advanced (DC-XA).

  9. KSC-2014-3449

    NASA Image and Video Library

    2014-08-10

    LOS ANGELES, Calif. – Andy Quiett, Detachment 3 deputy operations lead for the Orion program and DoD liaison for NASA, answers questions about the Orion boilerplate test vehicle from visitors touring the well deck of the USS Anchorage during the Science, Technology, Engineering and Mathematics, or STEM, Expo for L.A. Navy Days at the Port of Los Angeles in California. A combined team from NASA’s Ground Systems Development and Operations Program and the U.S. Navy were in San Diego to practice recovering Orion from the ocean, as they will do in December following the spacecraft's first trip to space during Exploration Flight Test-1. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep-space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett

  10. KSC-2014-3448

    NASA Image and Video Library

    2014-08-10

    LOS ANGELES, Calif. – Andy Quiett, Detachment 3 deputy operations lead for the Orion program and DoD liaison for NASA, answers questions about the Orion boilerplate test vehicle from visitors touring the well deck of the USS Anchorage during the Science, Technology, Engineering and Mathematics, or STEM, Expo for L.A. Navy Days at the Port of Los Angeles in California. A combined team from NASA’s Ground Systems Development and Operations Program and the U.S. Navy were in San Diego to practice recovering Orion from the ocean, as they will do in December following the spacecraft's first trip to space during Exploration Flight Test-1. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep-space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett

  11. KSC-2014-3447

    NASA Image and Video Library

    2014-08-10

    LOS ANGELES, Calif. – Andy Quiett, Detachment 3 deputy operations lead for the Orion program and DoD liaison for NASA, answers questions about the Orion boilerplate test vehicle from visitors touring the well deck of the USS Anchorage during the Science, Technology, Engineering and Mathematics, or STEM, Expo for L.A. Navy Days at the Port of Los Angeles in California. A combined team from NASA’s Ground Systems Development and Operations Program and the U.S. Navy were in San Diego to practice recovering Orion from the ocean, as they will do in December following the spacecraft's first trip to space during Exploration Flight Test-1. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep-space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett

  12. Second interim briefing (D3). Evolutionary Science and Applications Space Platform. Characterization of concepts, tasks A and B

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The objectives were to define, evaluate, and select concepts for evolving a space station in conjunction with the Space Platform for NASA science, Applications, Technology and DOD; and a permanently manned presence in space early, with a maximum of existing technology.

  13. 75 FR 37410 - Federal Advisory Committee; Defense Advisory Committee on Military Personnel Testing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... DEPARTMENT OF DEFENSE Office of the Secretary Federal Advisory Committee; Defense Advisory Committee on Military Personnel Testing AGENCY: Under Secretary of Defense for Personnel and Readiness, DoD...), and 41 CFR 102-3.150, DoD announces that the Defense Advisory Committee on Military Personnel Testing...

  14. 78 FR 42524 - Leasing versus Renting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration... your attached document. Fax: 202-501-4067. Mail: General Services Administration, Regulatory...

  15. KSC01kodi053

    NASA Image and Video Library

    2001-07-19

    KODIAK ISLAND, Alaska -- A technician performs final testing on Starshine 3 at the Naval Research Laboratory in Washington, D.C., to prepare for the launch of the Kodiak Star at Kodiak Island, Alaska. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  16. KSC01kodi054

    NASA Image and Video Library

    2001-07-19

    KODIAK ISLAND, Alaska -- A technician performs final testing on Starshine 3 at the Naval Research Laboratory in Washington, D.C., to prepare for the launch of the Kodiak Star at Kodiak Island, Alaska. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  17. Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS) - Cyclops

    NASA Technical Reports Server (NTRS)

    Smith, James P.; Lamb, Craig R.; Ballard, Perry G.

    2013-01-01

    Access to space for satellites in the 50-100 kg class is a challenge for the small satellite community. Rideshare opportunities are limited and costly, and the small sat must adhere to the primary payloads schedule and launch needs. Launching as an auxiliary payload on an Expendable Launch Vehicle presents many technical, environmental, and logistical challenges to the small satellite community. To assist the community in mitigating these challenges and in order to provide the community with greater access to space for 50-100 kg satellites, the NASA International Space Station (ISS) and Engineering communities in collaboration with the Department of Defense (DOD) Space Test Program (STP) is developing a dedicated 50-100 kg class ISS small satellite deployment system. The system, known as Cyclops, will utilize NASA's ISS resupply vehicles to launch small sats to the ISS in a controlled pressurized environment in soft stow bags. The satellites will then be processed through the ISS pressurized environment by the astronaut crew allowing satellite system diagnostics prior to orbit insertion. Orbit insertion is achieved through use of the Japan Aerospace Exploration Agency's Experiment Module Robotic Airlock (JEM Airlock) and one of the ISS Robotic Arms. Cyclops' initial satellite deployment demonstration of DOD STP's SpinSat and UT/TAMU's Lonestar satellites will be toward the end of 2013 or beginning of 2014. Cyclops will be housed on-board the ISS and used throughout its lifetime. The anatomy of Cyclops, its concept of operations for satellite deployment, and its satellite interfaces and requirements will be addressed further in this paper.

  18. The Behavior of TCP and Its Extensions in Space

    NASA Technical Reports Server (NTRS)

    Wang, Ruhai; Horan, Stephen

    2001-01-01

    The performance of Transmission Control Protocol (TCP) in space has been examined from the observations of simulation and experimental tests for several years at National Aeronautics and Space Administration (NASA), Department of Defense (DoD) and universities. At New Mexico State University (NMSU), we have been concentrating on studying the performance of two protocol suites: the file transfer protocol (ftp) running over Transmission Control Protocol/Internet Protocol (TCP/IP) stack and the file protocol (fp) running over the Space Communications Protocol Standards (SCPS)-Transport Protocol (TP) developed under the Consultative Committee for Space Data Systems (CCSDS) standards process. SCPS-TP is considered to be TCP's extensions for space communications. This dissertation experimentally studies the behavior of TCP and SCPS-TP by running the protocol suites over both the Space-to-Ground Link Simulator (SGLS) test-bed and realistic satellite link. The study concentrates on comparing protocol behavior by plotting the averaged file transfer times for different experimental configurations and analyzing them using Statistical Analysis System (SAS) based procedures. The effects of different link delays and various Bit-Error-Rates (BERS) on each protocol performance are also studied and linear regression models are built for experiments over SGLS test-bed to reflect the relationships between the file transfer time and various transmission conditions.

  19. Cyber-Defense Return on Investment for NAVFAC Energy Technologies

    DTIC Science & Technology

    2017-12-01

    Stakeholder input is important to properly develop a tool that reflects the legitimate concerns of those who routinely design , operate, and use control ...cybersecurity results with no control system network connectivity at all. Both are extreme scenarios, unless electrical engineers can design a...support of a Department of Defense (DOD) effort to improve cyber- security in relation to DOD installation control systems. Space and Naval Warfare

  20. The October 1973 expendable launch vehicle traffic model, revision 2

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Traffic model data for current expendable launch vehicles (assuming no space shuttle) for calendar years 1980 through 1991 are presented along with some supporting and summary data. This model was based on a payload program equivalent in scientific return to the October 1973 NASA Payload Model, the NASA estimated non NASA/non DoD Payload Model, and the 1971 DoD Mission Model.

  1. Small Business: Action Needed to Determine Whether DOD’s Comprehensive Subcontracting Plan Test Program Should Be Made Permanent

    DTIC Science & Technology

    2015-11-01

    collected. We determined that the methodologies were valid and the data were reliable for our purposes. In addition, we interviewed DOD officials and...of contracts and cost of labor involved in preparing program documentation, to arrive at the estimates for savings. To validate the data used in the...studies to be reasonable, and the data were sufficiently reliable for our purposes. We interviewed officials from DOD and 5 of the 12 Test Program

  2. CBR Operations in Cold Weather: A Bibliography. Volume 1

    DTIC Science & Technology

    1989-11-01

    JOHNSTON R C SWAMP OAK TEST DATA DOD/DROLS ; HANNEMANN M M D ANALYSIS. 514727L ;HALLANGER N L ;KROTH J R ;WESTLAKE WILFRED J ; HAMILTON WILLIAM M 1953...E 1963 HANNA ALFRED E; SIMULATED COLD WEATHER DOD/DROLS RADIOLOGICAL DECONTAMINATION 296248 OF RECOVERY EQUIPMENT. HANNEMANN M M D 1967 JOHNSTON R C...SWAMP OAK TEST DATA DOD/DROLS ; HANNEMANN M M D ANALYSIS. 514727L ;HALLANGER N L ;KROTH J R ;WESTLAKE WILFRED J : 37 HELLBERG E N 1961 TAYLOR D

  3. Commercialization of space transportation : exploring the impact of the National Space Transportation Policy

    DOT National Transportation Integrated Search

    1998-09-01

    The 1994 National Space Transportation Policy designates the roles of the DoD, NASA and the Departments of Transportaiton and Commerce to "identify and promote innovative types of arrangements between the US government and the private sector in order...

  4. DOD SPHERES-RINGS Test Session

    NASA Image and Video Library

    2013-11-04

    ISS037-E-025915 (4 Nov. 2013) --- In the International Space Station?s Kibo laboratory, NASA astronaut Michael Hopkins, Expedition 37 flight engineer, conducts a session with a pair of bowling-ball-sized free-flying satellites known as Synchronized Position Hold, Engage, Reorient, Experimental Satellites, or SPHERES. Surrounding the two SPHERES mini-satellites is ring-shaped hardware known as the Resonant Inductive Near-field Generation System, or RINGS. SPHERES-RINGS seeks to demonstrate wireless power transfer between satellites at a distance for enhanced operations.

  5. Environmental Assessment: For the Testing and Evaluation of Directed Energy System Using Laser Technology, Edwards Air Force Base

    DTIC Science & Technology

    2006-08-01

    restricted for use 14 by DoD, National Aeronautics and Space Administration ( NASA ), and other government agencies. This 15 airspace is over an area...counties in California and 21 extends into Nevada’s Esmeralda County ( NASA 1997a). 22 There are no warning, prohibited, or alert special use airspace...mountains or ridge 13 formations, spot the ground surface ( NASA 1997b). 14 The highest general elevation of the Mojave Desert approaches 4,000

  6. Lightning Imaging Sensor (LIS) on the International Space Station (ISS): Launch, Installation, Activation and First Results

    NASA Technical Reports Server (NTRS)

    Blakeslee, R. J.; Christian, H. J.; Mach, D. M.; Buechler, D. E.; Wharton, N. A.; Stewart, M. F.; Ellett, W. T.; Koshak, W. J.; Walker, T. D.; Virts, K.; hide

    2017-01-01

    Mission: Fly a flight-spare LIS (Lightning Imaging Sensor) on ISS to take advantage of unique capabilities provided by the ISS (e.g., high inclination, real time data); Integrate LIS as a hosted payload on the DoD Space Test Program-Houston 5 (STP-H5) mission and launch on a Space X rocket for a minimum 2 year mission. Measurement: NASA and its partners developed and demonstrated effectiveness and value of using space-based lightning observations as a remote sensing tool; LIS measures lightning (amount, rate, radiant energy) with storm scale resolution, millisecond timing, and high detection efficiency, with no land-ocean bias. Benefit: LIS on ISS will extend TRMM (Tropical Rainfall Measuring Mission) time series observations, expand latitudinal coverage, provide real time data to operational users, and enable cross-sensor calibration.

  7. NASA/DOD Flight Experiments Technical Interchange Meeting Proceedings

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This document contains the proceedings of the Flight Experiments Technical Interchange Meeting held in Monterey California, October 5-9, 1992. Technical sessions 4 through 8 addressing space structures, propulsion, space power systems, space environments and effects, and space operations are covered. Many of the papers are presented in outline and viewgraph form.

  8. Development of a verification program for deployable truss advanced technology

    NASA Technical Reports Server (NTRS)

    Dyer, Jack E.

    1988-01-01

    Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.

  9. Microbial Monitoring from the Frontlines to Space: Department of Defense Small Business Innovation Research Technology Aboard the International Space Station

    NASA Technical Reports Server (NTRS)

    Oubre, Cherie M.; Khodadad, Christina L.; Castro, Victoria A.; Ott, C. Mark; Flint, Stephanie; Pollack, Lawrence P.; Roman, Monserrate C.

    2017-01-01

    The RAZOR (trademark) EX, a quantitative Polymerase Chain Reaction (qPCR) instrument, is a portable, ruggedized unit that was designed for the Department of Defense (DoD) with its reagent chemistries traceable to a Small Business Innovation Research (SBIR) contract beginning in 2002. The PCR instrument's primary function post 9/11 was to enable frontline soldiers and first responders to detect biological threat agents and bioterrorism activities in remote locations to include field environments. With its success for DoD, the instrument has also been employed by other governmental agencies including Department of Homeland Security (DHS). The RAZOR (Trademark) EX underwent stringent testing by the vendor, as well as through the DoD, and was certified in 2005. In addition, the RAZOR (trademark) EX passed DHS security sponsored Stakeholder Panel on Agent Detection Assays (SPADA) rigorous evaluation in 2011. The identification and quantitation of microbial pathogens is necessary both on the ground as well as during spaceflight to maintain the health of astronauts and to prevent biofouling of equipment. Currently, culture-based monitoring technology has been adequate for short-term spaceflight missions but may not be robust enough to meet the requirements for long-duration missions. During a NASA-sponsored workshop in 2011, it was determined that the more traditional culture-based method should be replaced or supplemented with more robust technologies. NASA scientists began investigating innovative molecular technologies for future space exploration and as a result, PCR was recommended. Shortly after, NASA sponsored market research in 2012 to identify and review current, commercial, cutting edge PCR technologies for potential applicability to spaceflight operations. Scientists identified and extensively evaluated three candidate technologies with the potential to function in microgravity. After a thorough voice-of-the-customer trade study and extensive functional and safety evaluations, the RAZOR (trademark) EX PCR instrument(Bio-Fire Defense, Salt Lake City, UT) was selected as the most promising current technology for spaceflight monitoring applications.

  10. FASTSAT-HSV01 synergistic observations of the magnetospheric response during active periods: MINI-ME, PISA and TTI

    NASA Astrophysics Data System (ADS)

    Casas, Joseph; Collier, Michael; Rowland, Douglas; Sigwarth, John; Boudreaux, Mark

    Understanding the complex processes within the inner magnetosphere of Earth particularly during storm periods requires coordinated observations of the particle and field environment using both in-situ and remote sensing techniques. In fact in order to gain a better understand-ing of our Heliophysics and potentially improve our space weather forecasting capabilities, new observation mission approaches and new instrument technologies which can provide both cost effective and robust regular observations of magnetospheric activity and other space weather related phenomenon are necessary. As part of the effort to demonstrate new instrument tech-niques and achieve necessary coordinated observation missions, NASA's Fast Affordable Sci-ence and Technology Satellite Huntsville 01 mission (FASTSAT-HSV01) scheduled for launch in 2010 will afford a highly synergistic solution which satisfies payload mission opportunities and launch requirements as well as contributing in the near term to our improved understanding of Heliophysics. NASA's FASTSAT-HSV01 spacecraft on the DoD Space Test Program-S26 (STP-S26) Mission is a multi-payload mission executed by the DoD Space Test Program (STP) at the Space Development and Test Wing (SDTW), Kirtland AFB, NM. and is an example of a responsive and economical breakthrough in providing new possibilities for small space technology-driven and research missions. FASTSAT-HSV is a unique spacecraft platform that can carry multiple small instruments or experiments to low-Earth orbit on a wide range of expendable launch vehicles for a fraction of the cost traditionally required for such missions. The FASTSAT-HSV01 mission allows NASA to mature and transition a technical capability to industry while increasing low-cost access to space for small science and technology (ST) payloads. The FASTSAT-HSV01 payload includes three NASA Goddard Space Flight Center (GSFC) new technology built instruments that will study the terrestrial space environment and potentially contribute to space weather research in a synergistic manner. MINI-ME, a neutral atom imager, will observe the neutral atom inputs to ionospheric heating which can be important during high levels of magnetospheric activity. PISA, a plasma impedance spec-trometer, will measure simultaneously the local electron densities and temperatures as well as measure small scale density structure (500 m spatial scale) during these active periods. TTI, a thermospheric imager, will remotely determine the thermospheric temperature response to this magnetospheric activity. Together, these observations will contribute significantly to a comprehensive understanding of the flow of energy through and the response of the storm-time terrestrial magnetosphere.

  11. FASTSAT-HSV01 Synergistic Observations of the Magnetospheric Response During Active Periods: MINI-ME, PISA and TTI

    NASA Technical Reports Server (NTRS)

    Casas, Joseph C.; Collier, Michael R.; Rowland, Douglas E.; Sigwarth, John B.; Boudreaux, Mark E.

    2010-01-01

    Understanding the complex processes within the inner magnetosphere of Earth particularly during storm periods requires coordinated observations of the particle and field environment using both in-situ and remote sensing techniques. In fact in order to gain a better understanding of our Heliophysics and potentially improve our space weather forecasting capabilities, new observation mission approaches and new instrument technologies which can provide both cost effective and robust regular observations of magnetospheric activity and other space weather related phenomenon are necessary. As part of the effort to demonstrate new instrument techniques and achieve necessary coordinated observation missions, NASA's Fast Affordable Science and Technology Satellite Huntsville 01 mission (FASTSAT-HSVOI) scheduled for launch in 2010 will afford a highly synergistic solution which satisfies payload mission opportunities and launch requirements as well as contributing iri the near term to our improved understanding of Heliophysics. NASA's FASTSAT-HSV01 spacecraft on the DoD Space Test Program-S26 (STP-S26) Mission is a multi-payload mission executed by the DoD Space Test Program (STP) at the Space Development and Test Wing (SDTW), Kirtland AFB, NM. and is an example of a responsive and economical breakthrough in providing new possibilities for small space technology-driven and research missions. FASTSAT-HSV is a unique spacecraft platform that can carry multiple small instruments or experiments to low-Earth orbit on a wide range of expendable launch vehicles for a fraction of the cost traditionally required for such missions. The FASTSAT-HSV01 mission allows NASA to mature and transition a technical capability to industry while increasing low-cost access to space for small science and technology (ST) payloads. The FASTSAT-HSV01 payload includes three NASA Goddard Space Flight Center (GSFC) new technology built instruments that will study the terrestrial space environment and potentially contribute to space weather research in a synergistic manner. MINI-ME, a neutral atom imager, will observe the neutral atom inputs to ionospheric heating which can be important during high levels of magnetospheric activity. PISA, a plasma impedance spectrometer, will measure simultaneously the local electron densities and temperatures as well as measure small scale density structure (500 m spatial scale) during these active periods. TTI, a thermospheric imager, will remotely determine the thermospheric temperature response to this magnetospheric activity. Together, these observations will contribute significantly to a comprehensive understanding of the flow of energy through and the response of the storm-time terrestrial magnetosphere.

  12. Technology Projections for Solar Dynamic Power

    NASA Technical Reports Server (NTRS)

    Mason, Lee S.

    1999-01-01

    Solar Dynamic power systems can offer many potential benefits to Earth orbiting satellites including high solar-to-electric efficiency, long life without performance degradation, and high power capability. A recent integrated system test of a 2 kilowatt SD power system in a simulated space environment has successfully demonstrated technology readiness for space flight. Conceptual design studies of SD power systems have addressed several potential mission applications: a 10 kilowatt LEO satellite, a low power Space Based Radar, and a 30 kilowatt GEO communications satellite. The studies show that with moderate component development, SD systems can exhibit excellent mass and deployed area characteristics. Using the conceptual design studies as a basis, a SD technology roadmap was generated which identifies the component advances necessary to assure SD systems a competitive advantage for future NASA, DOD, and commercial missions.

  13. Status of the National Space Transportation System

    NASA Technical Reports Server (NTRS)

    Abrahamson, J. A.

    1984-01-01

    The National Space Transportation System is a national resources serving the government, Department of Defense and commercial needs of the USA and others. Four orbital flight tests were completed July 4, 1982, and the first Operational Flight (STS-5) which placed two commercial communications into orbit was conducted November 11, 1982. February 1983 marked the first flight of the newest orbiter, Challenger. Planned firsts in 1983 include: use of higher performance main engines and solid rocket boosters, around-the-clock crew operations, a night landing, extra-vehicular activity, a dedicated DOD mission, and the first flight of a woman crew member. By the end of 1983, five commercial payloads and two tracking and data relay satellites should be deployed and thirty-seven crew members should have made flights aboard the space shuttle.

  14. National Space Transportation Policy: Issues for Congress

    NASA Astrophysics Data System (ADS)

    1995-05-01

    This report, prepared for the House Committee on Science, is the first in a broad assessment of the health and future prospects of the U.S. space transportation technology and industrial base. The report focuses on the Clinton Administration's National Space Transportation Policy, which was released last fall. It examines administration policy in light of the implementation plans prepared by NASA, DOD, and the Transportation and Commerce Departments. The policy also emphasizes the important contribution private industry can make to the direction and development of U.S. space transportation capabilities. However, an analysis of the policy and implementation plans also raises some issues that might be of interest to Congress as it debates space transportation legislation, oversight, and funding. These issues involve decisions on NASA and DOD development programs, the use of foreign launch vehicles, and the new role of the private sector in space transportation research and development decisionmaking. This report also identifies two issues omitted from the Administration's policy: the preservation of long-range ballistic missile capabilities after final production in 2005, and the perspective of lower industrial tier firms toward national space transportation policy.

  15. Assessment and control of electrostatic charges. [hazards to space missions

    NASA Technical Reports Server (NTRS)

    Barrett, M.

    1974-01-01

    The experience is described of NASA and DOD with electrostatic problems, generation mechanisms, and type of electrostatic hazards. Guidelines for judging possible effects of electrostatic charges on space missions are presented along with mathematical formulas and definitions.

  16. 77 FR 67366 - Federal Acquisition Regulation; Information Collection; Travel Costs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE...; Information Collection; Travel Costs AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for comments...

  17. The MATHEMATICA economic analysis of the Space Shuttle System

    NASA Technical Reports Server (NTRS)

    Heiss, K. P.

    1973-01-01

    Detailed economic analysis shows the Thrust Assisted Orbiter Space Shuttle System (TAOS) to be the most economic Space Shuttle configuration among the systems studied. The development of a TAOS Shuttle system is economically justified within a level of space activities between 300 and 360 Shuttle flights in the 1979-1990 period, or about 25 to 30 flights per year, well within the U.S. Space Program including NASA and DoD missions. If the NASA and DoD models are taken at face value (624 flights), the benefits of the Shuttle system are estimated to be $13.9 billion with a standard deviation of plus or minus $1.45 billion in 1970 dollars (at a 10% social rate of discount). If the expected program is modified to 514 flights (in the 1979-1990 period), the estimated benefits of the Shuttle system are $10.2 billion, with a standard deviation of $940 million (at a 10% social rate of discount).

  18. Evolved Expendable Launch Vehicle: DOD Is Assessing Data on Worldwide Launch Market to Inform New Acquisition Strategy

    DTIC Science & Technology

    2016-07-22

    Launch Services (ILS) of a Proton M launch vehicle and one provided by Space Exploration Technologies ( SpaceX ) of a Falcon 9 launch vehicle — and...U.S. based providers are United Launch Alliance (ULA), Space Exploration Technologies Corporation ( SpaceX ), and Orbital ATK. Countries we reviewed

  19. Emerging Technologies: Small Satellite and Associated TPED

    NASA Astrophysics Data System (ADS)

    Zitz, R.

    2014-09-01

    The 2010 National Space Policy directs the U.S. space community, comprised of the Department of Defense, Intelligence Community, Military Services and NASA to examine our nation's ability to conduct space-based ISR and communications even during a period of peer state and near peer state attacks intended to deny us our advantages we accrue from our use of space systems. DOD and the ICs past experience is largely one of building small numbers of extraordinarily capable and expensive (exquisite) satellites for communications and ISR. As potential adversaries continue to develop cyber-attack capabilities and have demonstrated an ability to kinetically attack spacecraft, the vulnerability of our architecture is now a serious concern. In addition, the sluggish U.S. economy, the draw down and pull back from a decade of combat operations, and other factors have combined to force a significant reduction in DOD and IC spending over the coming decade(s). Simultaneously, DOD and the IC have a growing awareness that the long lead times and long mission duration of the exquisite space assets can lead to fielding technologies that become obsolete and mission limiting. Some DOD and IC leaders are now examining alternative architectures to provide lower cost, flexible, more diverse and rapidly launchable space systems. Government leaders are considering commercially hosted payloads in geosynchronous orbits and smaller, lower cost, free flying government and commercial satellites in low earth orbits. Additional changes to the ground tasking, processing, exploitation and dissemination (TPED) systems would ensure small satellites have end-to-end mission capability and meet emerging needs such as ease of tasking, multi-INT processing, and more advanced distribution mechanisms (e.g., to users on the move). Today, a majority of agency leaders and their subordinate program managers remain convinced that only large, expensive systems can truly answer requirements and provide reliable services. Champions for change to smaller, lower cost systems must demonstrate that technology and commercial business practices have evolved to the point that smaller, low cost, adequate performance is now achievable. This presentation concisely explains both sides of the debate and offers ideas for how to introduce smaller satellites and associated TPED solutions without incurring significant risk to existing missions.

  20. Report to Congress on the Activities of the DoD Office of Technology Transition

    DTIC Science & Technology

    2004-03-01

    carbon aerogel paper as both the positive and negative electrodes. A microporous separator is placed between the two electrodes, creating a sandwich ...sized to occupy minimal pallet space on a cargo aircraft , and offers reduced water requirements and equipment weight. D-13 Advanced Composites Carry... Aircraft , National Center for Manufacturing Sciences (NCMS/CTMA) and the U.S. DoD partnership Conference National Aeronautical Systems and Technology

  1. Radiation Effects and Hardening Techniques for Spacecraft Microelectronics

    NASA Astrophysics Data System (ADS)

    Gambles, J. W.; Maki, G. K.

    2002-01-01

    The natural radiation from the Van Allen belts, solar flares, and cosmic rays found outside of the protection of the earth's atmosphere can produce deleterious effects on microelectronics used in space systems. Historically civil space agencies and the commercial satellite industry have been able to utilize components produced in special radiation hardened fabrication process foundries that were developed during the 1970s and 1980s under sponsorship of the Departments of Defense (DoD) and Energy (DoE). In the post--cold war world the DoD and DoE push to advance the rad--hard processes has waned. Today the available rad--hard components lag two-plus technology node generations behind state- of-the-art commercial technologies. As a result space craft designers face a large performance gap when trying to utilize available rad--hard components. Compounding the performance gap problems, rad--hard components are becoming increasingly harder to get. Faced with the economic pitfalls associated with low demand versus the ever increasing investment required for integrated circuit manufacturing equipment most sources of rad--hard parts have simply exited this market in recent years, leaving only two domestic US suppliers of digital rad--hard components. This paper summarizes the radiation induced mechanisms that can cause digital microelectronics to fail in space, techniques that can be applied to mitigate these failure mechanisms, and ground based testing used to validate radiation hardness/tolerance. The radiation hardening techniques can be broken down into two classes, Hardness By Process (HBP) and Hardness By Design (HBD). Fortunately many HBD techniques can be applied to commercial fabrication processes providing space craft designer with radiation tolerant Application Specific Integrated Circuits (ASICs) that can bridge the performance gap between the special HBP foundries and the commercial state-of-the-art performance.

  2. An application of high authority/low authority control and positivity

    NASA Technical Reports Server (NTRS)

    Seltzer, S. M.; Irwin, D.; Tollison, D.; Waites, H. B.

    1988-01-01

    Control Dynamics Company (CDy), in conjunction with NASA Marshall Space Flight Center (MSFC), has supported the U.S. Air Force Wright Aeronautical Laboratory (AFWAL) in conducting an investigation of the implementation of several DOD controls techniques. These techniques are to provide vibration suppression and precise attitude control for flexible space structures. AFWAL issued a contract to Control Dynamics to perform this work under the Active Control Technique Evaluation for Spacecraft (ACES) Program. The High Authority Control/Low Authority Control (HAC/LAC) and Positivity controls techniques, which were cultivated under the DARPA Active Control of Space Structures (ACOSS) Program, were applied to a structural model of the NASA/MSFC Ground Test Facility ACES configuration. The control systems design were accomplished and linear post-analyses of the closed-loop systems are provided. The control system designs take into account effects of sampling and delay in the control computer. Nonlinear simulation runs were used to verify the control system designs and implementations in the facility control computers. Finally, test results are given to verify operations of the control systems in the test facility.

  3. Centaur Test Bed (CTB) for Cryogenic Fluid Management

    NASA Technical Reports Server (NTRS)

    Sakla, Steven; Kutter, Bernard; Wall, John

    2006-01-01

    Future missions such as NASA s space exploration vision and DOD satellite servicing will require significant increases in the understanding and knowledge of space based cryogenic fluid management (CFM), including the transfer and storage of cryogenic fluids. Existing CFM capabilities are based on flight of upper stage cryogenic vehicles, scientific dewars, a few dedicated flight demonstrations and ground testing. This current capability is inadequate to support development of the CEV cryogenic propulsion system, other aspects of robust space exploration or the refueling of satellite cryo propulsion systems with reasonable risk. In addition, these technologies can provide significant performance increases for missions beyond low-earth orbit to enable manned missions to the Moon and beyond. The Centaur upper-stage vehicle can provide a low cost test platform for performing numerous flight demonstrations of the full breadth of required CFM technologies to support CEV development. These flight demonstrations can be performed as secondary mission objectives using excess LH2 and/or LO2 from the main vehicle propellant tanks following primary spacecraft separation at minimal cost and risk.

  4. Overview of free-piston Stirling SP-100 activities at the NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Slaby, J. G.

    1986-01-01

    An overview of the National Aeronautics and Space Administration (NASA) Lewis Research Center (LeRC) SP-100 free-piston Stirling engine activities is presented. These activities are being conducted in support of the Department of Defense (DOD), Department of Energy (DOE), and NASA. The space-power technology effort, under SP-100, addresses the status of the 25 kWe Space Power Demonstrator Engine (SPDE). Another facet of the SP-100 project covers the status of an endurance test. Dynamic balancing of the SPDE engine is discussed along with a summary covering the parametric results of a study showing the relationship between power-converter specific weight and efficiency both as a function of Stirling engine heater to cooler temperature ratio. Design parameters and conceptual design features are presented for a 25 kWe, single-cylinder free-piston Stirling space-power converter. And finally, a description of a hydrodynamic gas bearing concept is presented.

  5. 78 FR 31550 - Federal Acquisition Regulation; Submission for OMB Review; Travel Costs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE...; Submission for OMB Review; Travel Costs AGENCIES: Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for...

  6. NASA/DOD Control/Structures Interaction Technology, 1986

    NASA Technical Reports Server (NTRS)

    Wright, Robert L. (Compiler)

    1986-01-01

    Control/structures interactions, deployment dynamics and system performance of large flexible spacecraft are discussed. Spacecraft active controls, deployable truss structures, deployable antennas, solar power systems for space stations, pointing control systems for space station gimballed payloads, computer-aided design for large space structures, and passive damping for flexible structures are among the topics covered.

  7. Space Shuttle Projects

    NASA Image and Video Library

    1989-11-22

    On November 22, 1989, at 7:23:30pm (EST), five astronauts were launched into space aboard the Space Shuttle Orbiter Discovery for the 5th Department of Defense (DOD) mission, STS-33. Crew members included Frederick D. Gregory, commander; John E. Blaha, pilot; and mission specialists Kathryn C. Thornton, Manley L. (Sonny) Carter, and F. Story Musgrave.

  8. Architecting Communication Network of Networks for Space System of Systems

    NASA Technical Reports Server (NTRS)

    Bhasin, Kul B.; Hayden, Jeffrey L.

    2008-01-01

    The National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD) are planning Space System of Systems (SoS) to address the new challenges of space exploration, defense, communications, navigation, Earth observation, and science. In addition, these complex systems must provide interoperability, enhanced reliability, common interfaces, dynamic operations, and autonomy in system management. Both NASA and the DoD have chosen to meet the new demands with high data rate communication systems and space Internet technologies that bring Internet Protocols (IP), routers, servers, software, and interfaces to space networks to enable as much autonomous operation of those networks as possible. These technologies reduce the cost of operations and, with higher bandwidths, support the expected voice, video, and data needed to coordinate activities at each stage of an exploration mission. In this paper, we discuss, in a generic fashion, how the architectural approaches and processes are being developed and used for defining a hypothetical communication and navigation networks infrastructure to support lunar exploration. Examples are given of the products generated by the architecture development process.

  9. International Space Station Lithium-Ion Battery Start-Up

    NASA Technical Reports Server (NTRS)

    Dalton, Penni J.; North, Tim; Bowens, Ebony; Balcer, Sonia

    2017-01-01

    International Space Station Lithium-Ion Battery Start-Up.The International Space Station (ISS) primary Electric Power System (EPS) was originally designed to use Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the space station is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries are designed to operate at a 35 depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. As the oldest of the 48 Ni-H2 battery Orbital Replacement Units (ORUs) has been cycling since September 2006, these batteries are now approaching their end of useful life. In 2010, the ISS Program began the development of Lithium-Ion (Li-ion) batteries to replace the Ni-H2 batteries and concurrently funded a Li-Ion ORU and cell life testing project. The first set of 6 Li-ion battery replacements were launched in December 2016 and deployed in January 2017. This paper will discuss the Li-ion battery on-orbit start-up and the status of the Li-Ion cell and ORU life cycle testing.

  10. An Evaluation of Blood Cholinesterase Testing Methods for Military Health

    DTIC Science & Technology

    2008-05-01

    activity found that only one device has been validated for ChE testing in the field: the Model 400 Test-mate™ ChE kit by EQM Research, Inc. (Cincinnati...OH). Suggested future modifications to the Model 400 Test-mate™ ChE kit include displaying/recording of acetyl-ChE activity uncorrected for...cholinesterase activity , that are routinely monitored by the Department of Defense (DoD). Within DoD, definitive cholinesterase testing is conducted by

  11. 75 FR 34643 - Atlantic Ocean Off John F. Kennedy Space Center, FL; Restricted Area

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Off John F. Kennedy Space Center, FL; Restricted Area AGENCY: U.S. Army Corps of Engineers, DoD... establishing a new restricted area in the Atlantic Ocean off the coast of the John F. Kennedy Space Center (KSC), Florida. The KSC is the main launch facility for the National Aeronautics and Space Administration (NASA...

  12. DOD Financial Management: Improvement Needed in DOD Components’ Implementation of Audit Readiness Effort

    DTIC Science & Technology

    2011-09-01

    DOD Financial Management Abbreviations AFB Air Force Base COSO Committee of Sponsoring Organizations of the Treadway... Management and mismanagement.11 All of DOD’s programs on GAO’s High- Risk List relate to its business operations, including systems and processes... Management maintains audit readiness through risk -based periodic testing of internal controls utilizing the OMB Circular No. A-123, Appendix A

  13. Key Management Infrastructure Increment 2 (KMI Inc 2)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Key Management Infrastructure Increment 2 (KMI Inc 2) Defense Acquisition Management...PB - President’s Budget RDT&E - Research, Development, Test, and Evaluation SAE - Service Acquisition Executive TBD - To Be Determined TY - Then...Assigned: April 6, 2015 Program Information Program Name Key Management Infrastructure Increment 2 (KMI Inc 2) DoD Component DoD The acquiring DoD

  14. Air and Space Operations Center-Weapon System Increment 10.2 (AOC-WS Inc 10.2)

    DTIC Science & Technology

    2016-03-01

    DAE - Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment...the AOC 10.2 MAIS was approximately 11 months beyond the original schedule estimates for MS-C, July 31, 2015, and FDD , July 31, 2016. Accordingly...ADM effectively acknowledged selection of AOC-WS Inc 10.2 as the Preferred Alternative, thereby starting the 5-year development window to attain FDD

  15. Leveraging Technology and Social Media for Information Sharing

    DTIC Science & Technology

    2009-04-01

    praised as a "gift to humanity the benefits of social networking sites such as Facebook and MySpace in forging friendships and understanding.2” The...is relatively easy to sign-up to and access. It should be noted that many DoD installations and agencies restrict access to social networking sites for...to sign-up to and access. As with facebook, many DoD installations and agencies restrict access to social networking sites . Users of Twitter are

  16. A Clementine collection: Moonglow

    NASA Astrophysics Data System (ADS)

    1994-06-01

    The Clementine story began in 1990 when NASA administrator Richard Truly asked the Department of Defense to consider a joint NASA/DOD mission that would achieve goals mutually beneficial to both organizations. That request was given to the then Strategic Defense Initiative Organization (SDIO) to investigate. A mission was conceived to test the latest in space-based imaging components, using the moon and a near-earth asteroid as celestial targets. The Clementine mission is the result of those early investigations. This collection is an early sampling of the 1.8 million images acquired by the Clementine spacecraft.

  17. 885-nm laser diode array pumped ceramic Nd:YAG master oscillator power amplifier system

    NASA Astrophysics Data System (ADS)

    Yu, Anthony W.; Li, Steven X.; Stephen, Mark A.; Seas, Antonios; Troupaki, Elisavet; Vasilyev, Aleksey; Conley, Heather; Filemyr, Tim; Kirchner, Cynthia; Rosanova, Alberto

    2010-04-01

    The objective of this effort is to develop more reliable, higher efficiency diode pumped Nd:YAG laser systems for space applications by leveraging technology investments from the DoD and other commercial industries. Our goal is to design, build, test and demonstrate the effectiveness of combining 885 nm laser pump diodes and the use of ceramic Nd:YAG for future flight missions. The significant reduction in thermal loading on the gain medium by the use of 885 nm pump lasers will improve system efficiency.

  18. KSC01kodi071

    NASA Image and Video Library

    2001-08-08

    KODIAK ISLAND, Alaska -- Technicians transport the Sapphire payload at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  19. KSC01KODI057

    NASA Image and Video Library

    2001-05-31

    KODIAK ISLAND, Alaska -- Technicians prepare the Athena I launch vehicle for flight at Kodiak Island, Alaska, as processing for the launch of Kodiak Star proceeds. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  20. Physical security equipment for combating terrorism

    NASA Astrophysics Data System (ADS)

    Toscano, Michael

    2002-08-01

    The objective of the Department of Defense Physical Security Equipment (DoD PSE) RDT&E program is to provide end users within the four Services with the most efficient and productive physical security (PS) at the most reasonable cost to ensure the effective protection of DoD resources. These resources include personnel, nuclear weapons, classified information, materiel, and readiness assets. As a result of the1996 Khobar Towers terrorist bombing incident, the DoD PSE program began to receive additional funding in 1997 for Force Protection Commercial-Off-The-Shelf (FP COTS) equipment evaluation and testing. The FP COTS testing applies to all available technologies, which are considered effective for DoD use. Successive terrorist incidents occurring since Khobar Towers have resulted in increasing focus on the demonstration and validation of equipment necessary to combat the ubiquitously asymmetric terrorist threat.

  1. Microfiberoptic fluorescence photobleaching reveals size-dependent macromolecule diffusion in extracellular space deep in brain.

    PubMed

    Zador, Zsolt; Magzoub, Mazin; Jin, Songwan; Manley, Geoffrey T; Papadopoulos, Marios C; Verkman, A S

    2008-03-01

    Diffusion in brain extracellular space (ECS) is important for nonsynaptic intercellular communication, extracellular ionic buffering, and delivery of drugs and metabolites. We measured macromolecular diffusion in normally light-inaccessible regions of mouse brain by microfiberoptic epifluorescence photobleaching, in which a fiberoptic with a micron-size tip is introduced deep in brain tissue. In brain cortex, the diffusion of a noninteracting molecule [fluorescein isothiocyanate (FITC)-dextran, 70 kDa] was slowed 4.5 +/- 0.5-fold compared with its diffusion in water (D(o)/D), and was depth-independent down to 800 microm from the brain surface. Diffusion was significantly accelerated (D(o)/D of 2.9+/-0.3) in mice lacking the glial water channel aquaporin-4. FITC-dextran diffusion varied greatly in different regions of brain, with D(o)/D of 3.5 +/- 0.3 in hippocampus and 7.4 +/- 0.3 in thalamus. Remarkably, D(o)/D in deep brain was strongly dependent on solute size, whereas diffusion in cortex changed little with solute size. Mathematical modeling of ECS diffusion required nonuniform ECS dimensions in deep brain, which we call "heterometricity," to account for the size-dependent diffusion. Our results provide the first data on molecular diffusion in ECS deep in brain in vivo and demonstrate previously unrecognized hindrance and heterometricity for diffusion of large macromolecules in deep brain.

  2. EOS-AM1 Nickel Hydrogen Cell Interim Life Test Report

    NASA Technical Reports Server (NTRS)

    Bennett, C. W.; Keys, D. J.; Rao, G. M.; Wannemacher, H. E.; Vaidyanathan, H.

    1997-01-01

    This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-l cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 13000 LEO cycles completed as of September 2, 1996. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 ampercs (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battely, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operating at +3 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements through the first 13,000 cycles, including: end of charge and discharge cell voltages and voltage gradients; end of chalge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all chalge parameters. The accelerated stress test battely has completed over 5900 cycles as of 9/11/96. This paper reports both battery performances as a function of cycle life, with individual cell performance comparisons repolted for selected cycles in both tests.

  3. Spline-locking screw fastening strategy

    NASA Technical Reports Server (NTRS)

    Vranish, John M.

    1992-01-01

    A fastener was developed by NASA Goddard for efficiently performing assembly, maintenance, and equipment replacement functions in space using either robotics or astronaut means. This fastener, the 'Spline Locking Screw' (SLS) would also have significant commercial value in advanced space manufacturing. Commercial (or DoD) products could be manufactured in such a way that their prime subassemblies would be assembled using SLS fasteners. This would permit machines and robots to disconnect and replace these modules/parts with ease, greatly reducing life cycle costs of the products and greatly enhancing the quality, timeliness, and consistency of repairs, upgrades, and remanufacturing. The operation of the basic SLS fastener is detailed, including hardware and test results. Its extension into a comprehensive fastening strategy for NASA use in space is also outlined. Following this, the discussion turns toward potential commercial and government applications and the potential market significance of same.

  4. Recent developments in photonic networking components for space applications

    NASA Astrophysics Data System (ADS)

    Parkerson, James P.; Gorman, Lanitia; Thamer, Robert; Chalfant, Charles H.; Hull, Anthony; Orlando, Fred J., Jr.

    2003-07-01

    Industrial, NASA, and DoD spacecraft designers have recognized the advantages of using fiber optic components and networks for their internal satellite data handling needs. Among the benefits are the total elimination of cable-to-cable and box-to-box EMI; significant size, weight and power reduction; greater on-orbit and integration and test flexibility and significantly lower integration and test costs. Additionally, intra-satellite data rates of 1 to 10 Gbps appear to be an absolute requirement for a number of advanced systems planned for development in the next few years. The only practical way to support these data rates is with fiber optics. Space Photonics and the University of Arkansas have developed fiber optic components (FireFiberTM) and networks that are designed specifically to meet these on-board, high data rate needs using NASA approved materials, packaging processes, and approved radiation tolerant devices. This paper will discuss recent developments in photonic components for spaceborne networks.

  5. A Comparison of Science and Technology Funding for DoD’s Space and Nonspace Programs

    DTIC Science & Technology

    2008-01-15

    Artificial intelligence for HAARP Multispectral signature libraries Environmental conditions that Ionospheric prediction HAARP Weather software for...Hardware and software for solar HAARP Electromagnetic interference for Plasma theory in the space Subproject details were not available Subproject

  6. 75 FR 17918 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Recovery and Reinvestment Act--One-Time Reporting Requirements for First-Tier Subcontractors AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space...

  7. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Recovery and Reinvestment Act--One-Time Reporting Requirements for First-Tier Subcontractors AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space...

  8. 77 FR 23369 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... AGENCY: Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and... Department of Defense, the General Services Administration, and the National Aeronautics and Space...

  9. Results of deep DoD life cycle tests at high rates on 12Ah NiCd cells

    NASA Technical Reports Server (NTRS)

    Panneton, Paul E.; Meyer, John R.

    1992-01-01

    A 12 Ah Nickel-Cadmium (NiCd) Low Earth Orbit (LEO) life cycle test that induced 47 percent more deep Depth Of Discharge cycles by mixing them with shallow DOD cycles is discussed. The test showed how aggressive recharging to a C/D ratio of 1.15 nearly doubled performance over cycling below a C/D of 1.11.

  10. Defense Infrastructure: DOD Efforts to Prevent and Mitigate Encroachment at Its Installations

    DTIC Science & Technology

    2016-11-01

    protected habitat, climate change, urban development, and airborne noise. DOD, the military services, and individual installations have a number of...carrying out realistic training because of the cumulative effect of outside influences —such as encroachment from urban growth—that GAO refers to in...airborne noise, urban growth, physical obstructions, and renewable energy projects. DOD Directive 3200.15, Sustaining Access to the Live Training and Test

  11. Overview of NATO Background on Scramjet Technology. Chapter 1

    NASA Technical Reports Server (NTRS)

    Drummond, J. Philip; Bouchez, Marc; McClinton, Charles R.

    2006-01-01

    The purpose of the present overview is to summarize the current knowledge of the NATO contributors. All the topics will be addressed in this chapter, with references and some examples. This background enhances the level of knowledge of the NATO scramjet community, which will be used for writing the specific chapters of the Report. Some previous overviews have been published on scramjet technology worldwide. NASA, DOD, the U.S. industry and global community have studied scramjet-powered hypersonic vehicles for over 40 years. Within the U.S. alone, NASA, DOD (DARPA, U.S. Navy and USAF), and industry have participated in hypersonic technology development. Over this time NASA Langley Research Center continuously studied hypersonic system design, aerothermodynamics, scramjet propulsion, propulsion-airframe integration, high temperature materials and structural architectures, and associated facilities, instrumentation and test methods. These modestly funded programs were substantially augmented during the National Aero-Space Plane (X-30) Program, which spent more than $3B between 1984 and 1995, and brought the DOD and other NASA Centers, universities and industry back into hypersonics. In addition, significant progress was achieved in all technologies required for hypersonic flight, and much of that technology was transferred into other programs, such as X-33, DC-X, X-37, X-43, etc. In addition, technology transfer impacted numerous other industries, including automotive, medical, sports and aerospace.

  12. The Virginia Space Flight Center model for an integrated federal/commercial launch range

    NASA Astrophysics Data System (ADS)

    Reed, Billie M.

    2000-01-01

    Until 1998, the federal government has been the predominant purchaser of space launches in the U.S. through the purchase of hardware and services. Historically, the government provided the necessary infrastructure for launches from the federal DoD and NASA launch ranges. In this historical model, the federal government had complete ownership, responsibility, liability, and expense for launch activities. In 1998, commercial space launches accounted for 60% of U.S. launches. This growth in commercial launches has increased the demand for launch range services. However, the expense, complexity of activities, and issues over certification of flight safety have deterred the establishment of purely commercial launch sites, with purely commercial being defined as without benefit of capabilities provided by the federal government. Provisions of the Commercial Space Launch Act have enabled DoD and NASA to support commercial launches from government launch ranges on a cost-reimbursable, non-interference basis. The government provides services including use of facilities, tracking and data services, and range and flight safety. In the 1990's, commercial space market projections indicated strong potential for large numbers of commercial satellites to be launched well into the first decade of the 21st century. In response to this significant opportunity for economic growth, several states established spaceports to provide the services necessary to meet these forecast commercial needs. In 1997, NASA agreed to the establishment of the Virginia Space Flight Center (VSFC), a commercial spaceport, at its Wallops Flight Facility. Under this arrangement, NASA agreed to allow the Virginia Commercial Space Flight Authority (VCSFA) to construct facilities on NASA property and agreed to provide launch range and other services in accordance with the Space Act and Commercial Space Launch Act in support of VSFC launch customers. A partnership relationship between NASA and VCSFA has emerged which pairs the strengths of the established NASA Test Range and the state-sponsored, commercial launch facility provider in an attempt to satisfy the needs for flexible, low-cost access to space. The continued viability of the VSFC and other commercial spaceports depend upon access to a space launch and re-entry range safety system that assures the public safety and is accepted by the public and government as authoritative and reliable. DoD and NASA budget problems have resulted in deteriorating services and reliability at federal ranges and has caused fear with respect to their ability to service the growing commercial market. Numerous high level studies have been conducted or are in progress that illuminate the deficiencies. No federal agency has been provided the necessary funding or authority to address the nations diminishing space launch capability. It is questionable as to whether the U.S. can continue to compete in the global space launch market unless these domestic space access problems are rapidly corrected. This paper discusses a potential solution to the lack of a coordinated response in the U.S. to the challenge presented by the global market for space launch facilities and services. .

  13. NASA/DOE/DOD nuclear propulsion technology planning: Summary of FY 1991 interagency panel results

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Wickenheiser, Timothy J.; Doherty, Michael P.; Marshall, Albert; Bhattacharryya, Samit K.; Warren, John

    1992-01-01

    Interagency (NASA/DOE/DOD) technical panels worked in 1991 to evaluate critical nuclear propulsion issues, compare nuclear propulsion concepts for a manned Mars mission on a consistent basis, and to continue planning a technology development project for the Space Exploration Initiative (SEI). Panels were formed to address mission analysis, nuclear facilities, safety policy, nuclear fuels and materials, nuclear electric propulsion technology, and nuclear thermal propulsion technology. A summary of the results and recommendations of the panels is presented.

  14. 77 FR 56737 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-61; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... Administration National Aeronautics and Space Administration 48 CFR Chapter 1 Federal Acquisition Regulations... AND SPACE ADMINISTRATION 48 CFR Chapter 1 [Docket FAR 2012-0080, Sequence 6] Federal Acquisition Regulation; Federal Acquisition Circular 2005-61; Introduction AGENCY: Department of Defense (DoD), General...

  15. What Exactly is Space Logistics?

    DTIC Science & Technology

    2011-01-01

    series, movies, and video games. Such phrases as “the final frontier” (from the opening lines of Star Trek ) or “the ulti- mate high ground” (from...years as NASA , DoD, and commercial space launch customers brought individual requirements to the table; there was no single, focused development

  16. Southern Impact Testing Alliance (SITA)

    NASA Technical Reports Server (NTRS)

    Hubbs, Whitney; Roebuck, Brian; Zwiener, Mark; Wells, Brian

    2009-01-01

    Efforts to form this Alliance began in 2008 to showcase the impact testing capabilities within the southern United States. Impact testing customers can utilize SITA partner capabilities to provide supporting data during all program phases-materials/component/ flight hardware design, development, and qualification. This approach would allow programs to reduce risk by providing low cost testing during early development to flush out possible problems before moving on to larger scale1 higher cost testing. Various SITA partners would participate in impact testing depending on program phase-materials characterization, component/subsystem characterization, full-scale system testing for qualification. SITA partners would collaborate with the customer to develop an integrated test approach during early program phases. Modeling and analysis validation can start with small-scale testing to ensure a level of confidence for the next step large or full-scale conclusive test shots. Impact Testing Facility (ITF) was established and began its research in spacecraft debris shielding in the early 1960's and played a malor role in the International Space Station debris shield development. As a result of return to flight testing after the loss of STS-107 (Columbia) MSFC ITF realized the need to expand their capabilities beyond meteoroid and space debris impact testing. MSFC partnered with the Department of Defense and academic institutions as collaborative efforts to gain and share knowledge that would benefit the Space Agency as well as the DoD. MSFC ITF current capabilities include: Hypervelocity impact testing, ballistic impact testing, and environmental impact testing.

  17. The Test and Evaluation of Unmanned and Autonomous Systems

    DTIC Science & Technology

    2008-12-01

    robotic/ intelli - gent machines for the U.S. Department of Defense (DoD). Although the technology is still nascent and advancing, we are faced with the...evolutionary nature of UAS acquisition must be met with evolutionary test capabilities yet to be discovered and developed. Test capabilities must be deployed...at a faster pace than UAS deployment to satisfy the demand for warfighter improvements. The DoD is stimulating this new area of innovation with

  18. DOD/NASA system impact analysis (study 2.1). Volume 1: Executive summary. [of space transportation costs

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Results are reported from a study made to determine engineering and cost analyses regarding the elements of space transportation systems. Specifically, a tug turnaround cost and abort modes and effects analyses were made. Study approach and objectives for both elements are given.

  19. Western Aeronautical Test Range

    NASA Technical Reports Server (NTRS)

    Sakahara, Robert D.

    2008-01-01

    NASA's Western Aeronautical Test Range (WATR) is a network of facilities used to support aeronautical research, science missions, exploration system concepts, and space operations. The WATR resides at NASA's Dryden Flight Research Center located at Edwards Air Force Base, California. The WATR is a part of NASA's Corporate Management of Aeronautical Facilities and funded by the Strategic Capability Asset Program (SCAP). It is managed by the Aeronautics Test Program (ATP) of the Aeronautics Research Mission Directorate (ARMD) to provide the right facility at the right time. NASA is a tenant on Edwards Air Force Base and has an agreement with the Air Force Flight Test Center to use the land and airspace controlled by the Department of Defense (DoD). The topics include: 1) The WATR supports a variety of vehicles; 2) Dryden shares airspace with the AFFTC; 3) Restricted airspace, corridors, and special use areas are available for experimental aircraft; 4) WATR Products and Services; 5) WATR Support Configuration; 6) Telemetry Tracking; 7) Time Space Positioning; 8) Video; 9) Voice Communication; 10) Mobile Operations Facilities; 11) Data Processing; 12) Mission Control Center; 13) Real-Time Data Analysis; and 14) Range Safety.

  20. DoD Financial Management: Important Steps Underway But Reform Will Require a Long-term Commitment

    DTIC Science & Technology

    2002-06-04

    consolidated financial statements . To date, none of the military services or major DOD components has passed the test of an independent financial audit because of weaknesses in financial management systems, operations, and controls.

  1. Field Demonstration and Validation of TREECS (trademark) and CTS for the Risk Assessment of Contaminants on Department of Defense (DoD) Ranges

    DTIC Science & Technology

    2017-04-01

    unlimited. N/A The objective of this project was to demonstrate and validate the integrated Training Range Environmental Evaluation and Characterization...Defense (DoD) training and testing ranges. Training Range Environmental Evaluation and Characterization System (TREECS™), Environmental Fate Simulator...Defense (DoD) Ranges” ERDC/EL TR-17-5 ii Abstract The Training Range Environmental Evaluation and Characterization Sys- tem (TREECS™) was developed to

  2. Space station needs, attributes and architectural options study. Briefing material, mid-term review

    NASA Technical Reports Server (NTRS)

    1982-01-01

    User mission requirements and their relationship to the current space transportation system are examined as a means of assuring the infusion of corporate ideas and knowledge in the space station program. Specific tasks include developing strategies to develop user consistency; determine DOD implication and requirements; and foster industry involvement in the space station. Mission alternatives; accrued benefits; program options; system attributes and characteristics; and a recommended plan for space station evolution are covered.

  3. EOS--AM1 Nickel Hydrogen Cell Interim Life Test Report

    NASA Technical Reports Server (NTRS)

    Bennett, C. W.; Keys, D. J.; Rao, G. M.; Wannemacher, H. E.; Vaidyanathan H.

    1999-01-01

    This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell. 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three. 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operatina at +30 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements throuch the first 18,202 cycles, including: end of chargee and discharge cell voltages and voltace -radients; end of charge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11,998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery performances as a function of cycle life for both the real time LEO and the accelerated life test regimes.

  4. EOS-AM1 Nickel Hydrogen Cell Interim Life Test Report

    NASA Technical Reports Server (NTRS)

    Bennett, Charles W.; Keys, D. J.; Rao, G. M.; Wannemacher, H. E.; Vaidyanathan, Hari

    1998-01-01

    This paper reports the interim results Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64-minute charge (VT at 1,507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5 percent DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60 percent DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.90 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (minus 5 deg) cold plate. The entire assembly is located in a thermal chamber operating at plus 3 deg. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at plus 10 deg. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge and discharge cell voltages and voltage gradients; end of charge and discharge cells pressures; within cell and between cell temperature gradients dischare capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery performances as a function of cycle life for both the real-time LEO and the accelerated life test regimes.

  5. International Space Station Lithium-Ion Battery

    NASA Technical Reports Server (NTRS)

    Dalton, Penni J.; Schwanbeck, Eugene; North, Tim; Balcer, Sonia

    2016-01-01

    The International Space Station (ISS) primary Electric Power System (EPS) currently uses Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the space station is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries are designed to operate at a 35 depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. Since the oldest of the 48 Ni-H2 battery Orbital Replacement Units (ORUs) has been cycling since September 2006, these batteries are now approaching their end of useful life. In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the Ni-H2 batteries and concurrently funded a Li-Ion ORU and cell life testing project. When deployed, they will be the largest Li-Ion batteries ever utilized for a human-rated spacecraft. This paper will include an overview of the ISS Li-Ion battery system architecture, the Li-Ion battery design and development, controls to limit potential hazards from the batteries, and the status of the Li-Ion cell and ORU life cycle testing.

  6. The Fifth NASA/DOD Controls-Structures Interaction Technology Conference, part 2

    NASA Technical Reports Server (NTRS)

    Newsom, Jerry R. (Compiler)

    1993-01-01

    This publication is a compilation of the papers presented at the Fifth NASA/DoD Controls-Structures Interaction (CSI) Technology Conference held in Lake Tahoe, Nevada, March 3-5, 1992. The conference, which was jointly sponsored by the NASA Office of Aeronautics and Space Technology and the Department of Defense, was organized by the NASA Langley Research Center. The purpose of this conference was to report to industry, academia, and government agencies on the current status of controls-structures interaction technology. The agenda covered ground testing, integrated design, analysis, flight experiments and concepts.

  7. Technicians complete foaming around Atlantis', OV-104, 17" ET feed line

    NASA Image and Video Library

    1990-07-10

    Technicians complete foaming around the area of Atlantis, Orbiter Vehicle (OV) 104, 17 inch diameter external tank (ET) feed line in preparation for the second liquid hydrogen tanking test at the Kennedy Space Center (KSC). An elaborate network of sensors, leak detectors, and baggies were set up on OV-104 by technicians. Engineers hope this extra instrumentation will help pinpoint the exact location of the leak. OV-104 is scheduled to be launched for the STS-38 mission, a classified Department of Defense (DOD) flight. View provided by KSC with alternate number KSC-90PC-988.

  8. KSC01kodi066

    NASA Image and Video Library

    2001-08-09

    KODIAK ISLAND, Alaska -- The PICSat and Starshine 3 (back) payloads wait for their launch aboard the Athena 1 launch vehicle at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  9. KSC01KODI040

    NASA Image and Video Library

    2001-05-31

    KODIAK ISLAND, Alaska -- Castor 120, the first stage of the Athena 1 launch vehicle, is raised off a truck at the launch pad at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  10. KSC01kodi063

    NASA Image and Video Library

    2001-08-09

    KODIAK ISLAND, Alaska -- The PCSat payload waits for its launch aboard the Athena 1 launch vehicle at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  11. KSC01kodi072

    NASA Image and Video Library

    2001-08-08

    KODIAK ISLAND, Alaska -- The Sapphire payload is moved into position next to the Starshine 3 payload at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  12. KSC01kodi059

    NASA Image and Video Library

    2001-07-31

    KODIAK ISLAND, Alaska -- Technicians prepare the Starshine 3 payload for its launch aboard the Athena 1 launch vehicle at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  13. KSC01kodi064

    NASA Image and Video Library

    2001-08-09

    KODIAK ISLAND, Alaska -- Technicians prepare the PICSat payload for its launch aboard the Athena 1 launch vehicle at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  14. KSC01KODI046

    NASA Image and Video Library

    2001-05-31

    KODIAK ISLAND, Alaska -- Technicians install Orbis 21D Equipment Section Boost Motor, the second stage of the Athena 1 launch vehicle, at Kodiak Island, Alaska, as processing for the launch of Kodiak Star proceeds. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  15. KSC01kodi062

    NASA Image and Video Library

    2001-07-31

    KODIAK ISLAND, Alaska -- Technicians prepare the Starshine 3 payload, while the payload fairing of the Athena 1 launch vehicle awaits servicing at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program

  16. KSC01KODI043

    NASA Image and Video Library

    2001-05-31

    KODIAK ISLAND, Alaska -- Castor 120, the first stage of the Athena 1 launch vehicle, is lowered into place at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  17. KSC01KODI039

    NASA Image and Video Library

    2001-05-31

    KODIAK ISLAND, Alaska -- Trucks transporting Orbis 21D Equipment Section Boost Motor, the second stage of the Athena 1 launch vehicle, arrive at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  18. KSC01KODI055

    NASA Image and Video Library

    2001-05-29

    KODIAK ISLAND, Alaska -- A convoy of trucks transports the stages of an Athena launch vehicle and supporting launch equipment to the pad at Kodiak Island, Alaska, as preparations to launch the Kodiak Star continue. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  19. KSC01KODI042

    NASA Image and Video Library

    2001-05-31

    KODIAK ISLAND, Alaska -- Castor 120, the first stage of the Athena 1 launch vehicle, is lifted into a vertical position at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  20. KSC01KODI041

    NASA Image and Video Library

    2001-05-31

    KODIAK ISLAND, Alaska -- Technicians inspect Castor 120, the first stage of the Athena 1 launch vehicle, at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  1. Technicians complete foaming around Atlantis', OV-104, 17' ET feed line

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Technicians complete foaming around the area of Atlantis, Orbiter Vehicle (OV) 104, 17 inch diameter external tank (ET) feed line in preparation for the second liquid hydrogen tanking test at the Kennedy Space Center (KSC). An elaborate network of sensors, leak detectors, and baggies were set up on OV-104 by technicians. Engineers hope this extra instrumentation will help pinpoint the exact location of the leak. OV-104 is scheduled to be launched for the STS-38 mission, a classified Department of Defense (DOD) flight. View provided by KSC with alternate number KSC-90PC-988.

  2. The Fifth NASA/DOD Controls-Structures Interaction Technology Conference, part 1

    NASA Technical Reports Server (NTRS)

    Newsom, Jerry R. (Compiler)

    1993-01-01

    This publication is a compilation of the papers presented at the Fifth NASA/DoD Controls-Structures Interaction (CSI) Technology Conference held in Lake Tahoe, Nevada, March 3-5, 1992. The conference, which was jointly sponsored by the NASA Office of Aeronautics and Space Technology and the Department of Defense, was organized by the NASA Langley Research Center. The purpose of this conference was to report to industry, academia, and government agencies on the current status of controls-structures interaction technology. The agenda covered ground testing, integrated design, analysis, flight experiments and concepts.

  3. The Space Environmental Impact System

    NASA Astrophysics Data System (ADS)

    Kihn, E. A.

    2009-12-01

    The Space Environmental Impact System (SEIS) is an operational tool for incorporating environmental data sets into DoD Modeling and Simulation (M&S) which allows for enhanced decision making regarding acquisitions, testing, operations and planning. The SEIS system creates, from the environmental archives and developed rule-base, a tool for describing the effects of the space environment on particular military systems, both historically and in real-time. The system uses data available over the web, and in particular data provided by NASA’s virtual observatory network, as well as modeled data generated specifically for this purpose. The rule base system developed to support SEIS is an open XML based model which can be extended to events from any environmental domain. This presentation will show how the SEIS tool allows users to easily and accurately evaluate the effect of space weather in terms that are meaningful to them as well as discuss the relevant standards used in its construction and go over lessons learned from fielding an operational environmental decision tool.

  4. Ovonic nickel metal hydride batteries for space applications

    NASA Technical Reports Server (NTRS)

    Venkatesan, S.; Corrigan, D. A.; Fetcenko, M. A.; Gifford, P. R.; Dhar, S. K.; Ovshinsky, S. R.

    1993-01-01

    Ovonic nickel-metal hydride (NiMH) rechargeable batteries are easily adaptable to a variety of applications. Small consumer NiMH cells were developed and are now being manufactured by licensees throughout the world. This technology was successfully scaled up in larger prismatic cells aimed at electric vehicle applications. Sealed cells aimed at satellite power applications were also built and cycle tested by OBC and other outside agencies. Prototype batteries with high specific energy (over 80 Wh/kg), high energy density (245 Wh/L), and excellent power capability (400 W/kg) were produced. Ovonic NiMH batteries demonstrated an excellent cycle life of over 10,000 cycles at 30 percent DOD. Presently, Ovonic Battery Company is working on an advanced version of this battery for space applications as part of an SBIR contract from NASA.

  5. EOS-AM1 Nickel Hydrogen Cell

    NASA Technical Reports Server (NTRS)

    Bennett, Charles W.; Keys, Denney J.; Rao, Gopalakrishna M.; Wannemacher, Hari E.; Vaidyanathan, Harry

    1997-01-01

    This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missile and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of die tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18,202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operating at +30 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge mid discharge cell voltages and voltage gradients; end of charge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11,998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery perfortnances as a funcfion of cycle life for both the real-time LEO and the accelerated life test regimes.

  6. Defense Space Acquisitions: Too Early to Determine if Recent Changes Will Resolve Persistent Fragmentation in Management and Oversight

    DTIC Science & Technology

    2016-07-27

    effectively respond to these threats has increased the importance of focused leadership in national security space. In Senate Report 114-49 accompanying...review the effectiveness of the current DOD space acquisition and oversight model and to evaluate what changes, if any, could be considered to... effectively consolidate space leadership. Some of these responsibilities include reviewing all service budgets for conformity with national security

  7. Natural Gas Engine-Driven Heat Pump Demonstration at DoD Installations: Performance and Reliability Summary

    DTIC Science & Technology

    2009-06-09

    ER D C/ CE R L TR -0 9 -1 0 Natural Gas Engine-Driven Heat Pump Demonstration at DoD Installations Performance and Reliability Summary...L ab or at or y Approved for public release; distribution is unlimited. ERDC/CERL TR-09-10 June 2009 Natural Gas Engine-Driven Heat Pump ...CERL TR-09-10 ii Abstract: Results of field testing natural gas engine-driven heat pumps (GHP) at six southwestern U.S. Department of Defense (DoD

  8. F 35 JOINT STRIKE FIGHTER DOD Needs to Complete Developmental Testing Before Making Significant New Investments

    DTIC Science & Technology

    2017-04-01

    from contractors . Until Block 3F testing is complete, DOD will not have the knowledge it needs to present a sound business case for Block 4. Second...January 2017 the details of this plan were unclear because DOD’s 2018 budget was not final and negotiations with the contractors were ongoing...management reports and historical test data; discussed key aspects of F-35 development with program management and contractor officials; and compared

  9. Laboratory simulation of space plasma phenomena*

    NASA Astrophysics Data System (ADS)

    Amatucci, B.; Tejero, E. M.; Ganguli, G.; Blackwell, D.; Enloe, C. L.; Gillman, E.; Walker, D.; Gatling, G.

    2017-12-01

    Laboratory devices, such as the Naval Research Laboratory's Space Physics Simulation Chamber, are large-scale experiments dedicated to the creation of large-volume plasmas with parameters realistically scaled to those found in various regions of the near-Earth space plasma environment. Such devices make valuable contributions to the understanding of space plasmas by investigating phenomena under carefully controlled, reproducible conditions, allowing for the validation of theoretical models being applied to space data. By working in collaboration with in situ experimentalists to create realistic conditions scaled to those found during the observations of interest, the microphysics responsible for the observed events can be investigated in detail not possible in space. To date, numerous investigations of phenomena such as plasma waves, wave-particle interactions, and particle energization have been successfully performed in the laboratory. In addition to investigations such as plasma wave and instability studies, the laboratory devices can also make valuable contributions to the development and testing of space plasma diagnostics. One example is the plasma impedance probe developed at NRL. Originally developed as a laboratory diagnostic, the sensor has now been flown on a sounding rocket, is included on a CubeSat experiment, and will be included on the DoD Space Test Program's STP-H6 experiment on the International Space Station. In this presentation, we will describe several examples of the laboratory investigation of space plasma waves and instabilities and diagnostic development. *This work supported by the NRL Base Program.

  10. Space Shuttle Projects

    NASA Image and Video Library

    1990-02-28

    The STS-36 mission launch aboard the Space Shuttle Orbiter Atlantis on February 28, 1990 at 2:50:22am (EST). The crew featured five astronauts who served in the 6th Department of Defense (DOD) mission: John H. Creighton, commander; John H. Caster, pilot; and mission specialists Pierre J. Thuot, Richard M. (Mike) Mullane, and David. C. Hilmers.

  11. Contingency Operations Support to NASA Johnson Space Center Medical Operations Division

    NASA Technical Reports Server (NTRS)

    Stepaniak, Philip; Patlach, Bob; Swann, Mark; Adams, Adrien

    2005-01-01

    The Wyle Laboratories Contingency Operations Group provides support to the NASA Johnson Space Center (JSC) Medical Operations Division in the event of a space flight vehicle accident or JSC mishap. Support includes development of Emergency Medical System (EMS) requirements, procedures, training briefings and real-time support of mishap investigations. The Contingency Operations Group is compliant with NASA documentation that provides guidance in these areas and maintains contact with the United States Department of Defense (DOD) to remain current on military plans to support NASA. The contingency group also participates in Space Operations Medical Support Training Courses (SOMSTC) and represents the NASA JSC Medical Operations Division at contingency exercises conducted worldwide by the DOD or NASA. The events of September 11, 2001 have changed how this country prepares and protects itself from possible terrorist attacks on high-profile targets. As a result, JSC is now considered a high-profile target and thus, must prepare for and develop a response to a Weapons of Mass Destruction (WMD) incident. The Wyle Laboratories Contingency Operations Group supports this plan, specifically the medical response, by providing expertise and manpower.

  12. Supporting the Use of CERT (registered trademark) Secure Coding Standards in DoD Acquisitions

    DTIC Science & Technology

    2012-07-01

    Capability Maturity Model IntegrationSM (CMMI®) [Davis 2009]. SM Team Software Process, TSP, and Capability Maturity Model Integration are service...STP Software Test Plan TEP Test and Evaluation Plan TSP Team Software Process V & V verification and validation CMU/SEI-2012-TN-016 | 47...Supporting the Use of CERT® Secure Coding Standards in DoD Acquisitions Tim Morrow ( Software Engineering Institute) Robert Seacord ( Software

  13. The applicability of DOE solar cell and array technology to space power

    NASA Technical Reports Server (NTRS)

    Scott-Monck, J. A.; Stella, P. M.; Berman, P. A.

    1980-01-01

    An evaluation of the main terrestrial photovoltaic development projects was performed. Technologies that may have applicability to space power are identified. Where appropriate, recommendations are made for programs to capitalize on developed technology. It is concluded that while the funding expended by DOE is considerably greater than the space (NASA and DOD) budget for photovoltaics, the terrestrial goals and the means for satisfying them are sufficiently different from space needs that little direct benefit currently exists for space applications.

  14. Space exploration initiative candidate nuclear propulsion test facilities

    NASA Technical Reports Server (NTRS)

    Baldwin, Darrell; Clark, John S.

    1993-01-01

    One-page descriptions for approximately 200 existing government, university, and industry facilities which may be available in the future to support SEI nuclear propulsion technology development and test program requirements are provided. To facilitate use of the information, the candidate facilities are listed both by location (Index L) and by Facility Type (Index FT). The included one-page descriptions provide a brief narrative description of facility capability, suggest potential uses for each facility, and designate a point of contact for additional information that may be needed in the future. The Nuclear Propulsion Office at NASA Lewis presently plans to maintain, expand, and update this information periodically for use by NASA, DOE, and DOD personnel involved in planning various phases of the SEI Nuclear Propulsion Project.

  15. 32 CFR 230.4 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... on DoD installations shall be provided logistic support as set forth in 32 CFR part 231. (6) Military... services (to include in-store banking) requiring the outgrant of additional space or logistical support...

  16. 32 CFR 230.4 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... on DoD installations shall be provided logistic support as set forth in 32 CFR part 231. (6) Military... services (to include in-store banking) requiring the outgrant of additional space or logistical support...

  17. 32 CFR 230.4 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... on DoD installations shall be provided logistic support as set forth in 32 CFR part 231. (6) Military... services (to include in-store banking) requiring the outgrant of additional space or logistical support...

  18. Temporal and modal characterization of DoD source air toxic emission factors: final report

    EPA Science Inventory

    This project tested three, real-/near real-time monitoring techniques to develop air toxic emission factors for Department of Defense (DoD) platform sources. These techniques included: resonance enhanced multi photon ionization time of flight mass spectrometry (REMPI-TOFMS) for o...

  19. NPOESS System Architecture

    NASA Astrophysics Data System (ADS)

    Hinnant, F.

    2009-12-01

    The National Oceanic and Atmospheric Administration (NOAA), Department of Defense (DoD), and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation weather and environmental satellite system; the National Polar-orbiting Operational Environmental Satellite System (NPOESS). NPOESS replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the Defense Meteorological Satellite Program (DMSP) managed by the DoD and will provide continuity for the NASA Earth Observation System with the launch of the NPOESS Preparatory Project. This poster will provide a top level status update of the program, as well as an overview of the NPOESS system architecture, which includes four segments. The space segment includes satellites in two orbits that carry a suite of sensors that collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The NPOESS system design allows centralized mission management and delivers high quality environmental products to military, civil and scientific users through a Command, Control, and Communication Segment (C3S). The data processing for NPOESS is accomplished through an Interface Data Processing Segment (IDPS)/Field Terminal Segment (FTS) that processes NPOESS satellite data to provide environmental data products to NOAA and DoD processing centers operated by the United States government as well as remote terminal users. The Launch Support Segment completes the four segments that make up the NPOESS system that will enhance the connectivity between research and operations and provide critical operational and scientific environmental measurements to military, civil, and scientific users until 2026.

  20. National Polar-orbiting Operational Environmental Satellite System (NPOESS) Design and Architecture

    NASA Astrophysics Data System (ADS)

    Hinnant, F.

    2008-12-01

    The National Oceanic and Atmospheric Administration (NOAA), Department of Defense (DoD), and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation weather and environmental satellite system - the National Polar-orbiting Operational Environmental Satellite System (NPOESS). NPOESS will replace the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the Defense Meteorological Satellite Program (DMSP) managed by the DoD and will provide continuity for the NASA Earth Observing System (EOS) with the launch of the NPOESS Preparatory Project (NPP). This poster will provide an overview of the NPOESS architecture, which includes four segments. The space segment includes satellites in two orbits that carry a suite of sensors to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the Earth, atmosphere, and near-Earth space environment. The NPOESS design allows centralized mission management and delivers high quality environmental products to military, civil and scientific users through a Command, Control, and Communication Segment (C3S). The data processing for NPOESS is accomplished through an Interface Data Processing Segment (IDPS)/Field Terminal Segment (FTS) that processes NPOESS satellite data to provide environmental data products to NOAA and DoD processing centers operated by the United States government as well as to remote terminal users. The Launch Support Segment completes the four segments that make up NPOESS that will enhance the connectivity between research and operations and provide critical operational and scientific environmental measurements to military, civil, and scientific users until 2026.

  1. Integrated Strategic Planning and Analysis Network Increment 4 (ISPAN Inc 4)

    DTIC Science & Technology

    2016-03-01

    Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment Decision FY...Inc 4 will achieve FDD completion criteria when: 1) the system meets all the KPP thresholds as verified through an Initial Operational Test and

  2. Space Shuttle Projects

    NASA Image and Video Library

    1990-11-05

    The seventh mission dedicated to the Department of Defense (DOD), the STS-38 mission, launched aboard the Space Shuttle Atlantis on November 15, 1990 at 6:48:15 pm (EST). The STS-38 crew included the following five astronauts: Richard O. Covey, commander; Frank L. Culbertson, pilot; and mission specialists Charles D. (Sam) Gemar, Robert C. Springer, and Carl J. Meade.

  3. Space Shuttle Projects

    NASA Image and Video Library

    1989-08-08

    On August 8, 1989, the 4th mission dedicated to the Department of Defense (DOD), STS-28, lifted off from Kennedy Space Center’s (KSC) launch pad 39B. The five day mission included a crew of five: Richard N. (Dick) Richards, pilot; Brewster H. Shaw, commander; and mission specialists David C. Leestma, Mark N. Brown, and James C. (Jim) Adamson.

  4. 32 CFR Appendix E to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Navy

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... DoD installation facility, including office space, classrooms, laboratories, or other features, that... readiness center, armory, unit, etc.), or recruiting center (leased space inside a shopping mall or office... afforded the opportunity to complete their high school education through a state-funded or Service...

  5. DOD Dictionary of Military and Associated Terms

    DTIC Science & Technology

    2017-03-01

    to regionally grouped military and federal customers from commercial distributors using electronic commerce. Also called PV . See also distribution...and magnetosphere, interplanetary space, and the solar atmosphere. (JP 3-59) Terms and Definitions 218 space force application — Combat...precise time and time interval PUK packup kit PV prime vendor PVNTMED preventive medicine PVT positioning, velocity, and timing Abbreviations

  6. NDT standards from the perspective of the Department of Defense

    NASA Astrophysics Data System (ADS)

    Strauss, Bernard

    1992-09-01

    The interaction of the DoD non-Government Society (NGS) bodies in the area of nondestructive testing (NDT) are illustrated. The adoption process for NGS is outlined including the criteria for adoption, what adoption means, and the advantages of DoD/NGS interaction. The tasks of the DoD's Standardization Program Plan for NDT are described along with DoD's efforts on a Joint Army, Navy, Air Force (JANNAF) NDE Subcommittee and on an international standardization group (America, Britain, Canada, and Australia) called the Quadripartite Working Group on Proofing, Inspection, and Quality Assurance.

  7. Arctic Planning: DOD Expects to Play a Supporting Role to Other Federal Agencies and Has Efforts Under Way to Address Capability Needs and Update Plans

    DTIC Science & Technology

    2015-06-01

    example, in 2014 DOD tested a new communication system— the Mobile User Objective System—that is intended to provide a secure, ultra -high-frequency...national security needs, stating that DOD does not anticipate a need to begin construction of additional bases or a deepwater port in Alaska before 2020.b...in Nome, Alaska, to support a deepwater port. Page 21 GAO-15-566 Arctic Planning Capability need Actions taken by the Department of

  8. Deep Bore Storage of Nuclear Waste Using MMW (Millimeter Wave) Technology, STTR Fast Track Project, Phase I Final Report-Revised

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oglesby, Kenneth D.; Woskov, Paul; Einstein, Herbert

    This report covers the technical work in Phase I of this DOE-Nuclear Program STTR Fast Track project. All key tasks were successfully performed, new tasks were added to utilize DOD-AFRL’s 95 GigaHertz (GHz) gyrotron in Phase II, while other lesser tasks were left for Phase II efforts or were requested to be made optional. This research adds to our understanding of using MMW power to melt and vaporize rocks and steel/ metals and laid plans for future testing in Phase II. This work built upon a prior DOE project DE-EE0005504 that developed the basic waveguide setup, process and instruments. Inmore » this project we were investigating the use of MMW to form rock melt and steel plugs in deep wells to further isolate highly radioactive nuclear waste in ultra-deep basement rocks for long term storage. This technology also has potential for deep well drilling for nuclear storage, geothermal and oil and gas industries. It also has the potential for simultaneously sealing and securing the wellbore with a thick rock melt liner as the wellbore is drilled. This allows for higher levels of safety and protection of the environment during deep drilling operations. The larger purpose of this project was to find answers to key questions in progressing MMW technology for these applications. Phase I of this project continued bench testing using the MIT 10 kilo-Watt (kW), 28 GHz frequency laboratory gyrotron, literature searches, planning and design of equipment for Phase II efforts. Furnace melting and rock testing (Tasks 4 and 5) were deferred to Phase II due to lack of concurrent availability of the furnace and personnel at MIT. That delay and lower temperature furnace (limited to 1650oC) caused rethinking of Task 4 to utilize coordinated rock selection with the DOD testing in Phase II. The high pressure and high power window design work (moved to Phase I Task 3 from Phase II Task 20) and Additive materials and methods (Tasks 7 & 8) performed in Phase I may become patentable and thus little detail can be provided in this public report. A version of that new high pressure, high MMW power window may be built for possible Phase II testing at the DOD site. Most significantly, additional tasks were added for planning the use of the Department of Defense, Air Force Research Laboratory’s (DOD-AFRL’s) System 0 gyrotron in Phase II. Specifically added and accomplished were multiple discussions on DOD and DOE-MIT-Impact goals, timing between ongoing DOD testing, outlining the required equipment and instruments for rock testing, and terms for an agreement. That addition required a visit to Kirtland AFB in Albuquerque, New Mexico to talk to key DOD-AFRL personnel and management. A DOD-Impact-MIT charter (i.e., contract) is now being circulated for signatures. Also added task to Phase I, MIT designed the critical path reflected power isolator screen for Phase II testing. To ensure compatibility, that design was computer simulated for the expected heat load distribution and the resulting temperature increase. Advancing the MMW testing up to the optimum 95 GHz and 100kW (5X higher) power levels was stated in the original proposal to be a key required development step for this technology to achieve prototype drilling, lining, and rock melting/ vaporization for creating sealing plugs.« less

  9. Learning-Based Cell Injection Control for Precise Drop-on-Demand Cell Printing.

    PubMed

    Shi, Jia; Wu, Bin; Song, Bin; Song, Jinchun; Li, Shihao; Trau, Dieter; Lu, Wen F

    2018-06-05

    Drop-on-demand (DOD) printing is widely used in bioprinting for tissue engineering because of little damage to cell viability and cost-effectiveness. However, satellite droplets may be generated during printing, deviating cells from the desired position and affecting printing position accuracy. Current control on cell injection in DOD printing is primarily based on trial-and-error process, which is time-consuming and inflexible. In this paper, a novel machine learning technology based on Learning-based Cell Injection Control (LCIC) approach is demonstrated for effective DOD printing control while eliminating satellite droplets automatically. The LCIC approach includes a specific computational fluid dynamics (CFD) simulation model of piezoelectric DOD print-head considering inverse piezoelectric effect, which is used instead of repetitive experiments to collect data, and a multilayer perceptron (MLP) network trained by simulation data based on artificial neural network algorithm, using the well-known classification performance of MLP to optimize DOD printing parameters automatically. The test accuracy of the LCIC method was 90%. With the validation of LCIC method by experiments, satellite droplets from piezoelectric DOD printing are reduced significantly, improving the printing efficiency drastically to satisfy requirements of manufacturing precision for printing complex artificial tissues. The LCIC method can be further used to optimize the structure of DOD print-head and cell behaviors.

  10. High Frontier: The Journal for Space and Missile Professionals. Volume 7, Number 4, August 2011

    DTIC Science & Technology

    2011-08-01

    assess the role of space assets in military operations and the relationship between “white” and “ black ” space—those programs acknowledged and...economize, ratio- nalize, and eventually re-energize the “ black ” space programs in relationship to the “white” programs managed by DoD. Fi- nally, it...Negroponte. Significant issues related to national security space, primarily those affecting the “ black ” programs, were resolved by this EXCOM. By all

  11. Development of standardized specifications for screening space level integrated circuits and semiconductors

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Standardized methods are established for screening of JAN B microcircuits and JANTXV semiconductor components for space mission or other critical applications when JAN S devices are not available. General specifications are provided which outline the DPA (destructive physical analysis), environmental, electrical, and data requirements for screening of various component technologies. This standard was developed for Air Force Space Division, and is available for use by other DOD agencies, NASA, and space systems contractors for establishing common screening methods for electronic components.

  12. Spline-Locking Screw Fastening Strategy (SLSFS)

    NASA Technical Reports Server (NTRS)

    Vranish, John M.

    1991-01-01

    A fastener was developed by NASA Goddard for efficiently performing assembly, maintenance, and equipment replacement functions in space using either robotic or astronaut means. This fastener, the 'Spline Locking Screw' (SLS) would also have significant commercial value in advanced manufacturing. Commercial (or DoD) products could be manufactured in such a way that their prime subassemblies would be assembled using SLS fasteners. This would permit machines and robots to disconnect and replace these modules/parts with ease, greatly reducing life cycle costs of the products and greatly enhancing the quality, timeliness, and consistency of repairs, upgrades, and remanufacturing. The operation of the basic SLS fastener is detailed, including hardware and test results. Its extension into a comprehensive fastening strategy for NASA use in space is also outlined. Following this, the discussion turns toward potential commercial and government applications and the potential market significance of same.

  13. International Space Station Lithium-Ion Battery

    NASA Technical Reports Server (NTRS)

    Dalton, Penni J.; Balcer, Sonia

    2016-01-01

    The International Space Station (ISS) Electric Power System (EPS) currently uses Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The batteries are charged during insolation and discharged during eclipse. The Ni-H2 batteries are designed to operate at a 35 depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. Since the oldest of the 48 Ni-H2 battery Orbital Replacement Units (ORUs) has been cycling since September 2006, these batteries are now approaching their end of useful life. In 2010, the ISS Program began the development of Lithium-Ion (Li-ion) batteries to replace the Ni-H2 batteries and concurrently funded a Li-ion cell life testing project. This paper will include an overview of the ISS Li-Ion battery system architecture and the progress of the Li-ion battery design and development.

  14. F-35 Joint Strike Fighter: Current Outlook Is Improved, but Long-Term Affordability Is a Major Concern

    DTIC Science & Technology

    2013-03-01

    and improvement efforts with DOD, F-35 program, and contractor officials. We toured the aircraft manufacturing plant , obtained production and supply...members of the contractor’s work force and DOD plant representatives. We evaluated DOD’s restructuring actions and impacts on the program, tracked...Testing of the final increment is expected to begin in 2014 and continue through 2016. Initial operational test and evaluation ( IOT &E) is

  15. Rekindled vision of hypersonic travel

    NASA Technical Reports Server (NTRS)

    Colladay, Raymond S.

    1987-01-01

    NASA has joined with the DOD to conduct the National Aerospace Plane (NASP) program, whose experimental test vehicle will be designated the X-30. NASP will study the X-30's takeoff from a runway under its own power, acceleration to high Mach number on the basis of airbreathing propulsion, emergence into LEO, reentry into the earth atmosphere, and descent to a powered horizontal landing. NASP will thereby generate technology base data for three distinct types of aircraft: upper-atmosphere hypersonic-cruise aircraft, LEO space transports, and military transatmospheric vehicles. The current concept-validation phase of NASP focuses on airbreathing propulsion, lightweight/high-strength heat-resistant materials, and computational fluid dynamics.

  16. Nuclear Thermal Propulsion Technology - Summary of FY 1991 Interagency Panel Planning

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Mcdaniel, Patrick; Howe, Steven; Stanley, Marland

    1991-01-01

    An Interagency (NASA/DOE/DOD) technical panel has been working in 1991 to evaluate nuclear thermal propulsion (NTP) concepts on a consistent basis, and to continue technology development project planning for a joint project in nuclear propulsion for Space Exploration Initiative (SEI). This paper summarizes the efforts of the panel to date and summarizes the technology plans defined for NTP. Concepts were categorized based on probable technology readiness data, and innovative 'proof-of-concept' tests and analyses were defined. While further studies will be required to provide a consistent comparison of all of the NTP concepts, the current status of the studies is presented.

  17. KSC01KODI035

    NASA Image and Video Library

    2001-05-29

    KODIAK ISLAND, Alaska -- A special platform connects the barge with a ramp to allow Castor 120, the first stage of the Athena 1 launch vehicle, to safely move onto the dock at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  18. KSC01kodi058

    NASA Image and Video Library

    2001-07-31

    KODIAK ISLAND, Alaska -- Technicians prepare the Starshine 3 payload for its launch aboard the Athena 1 launch vehicle, while the payload fairing awaits processing, at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  19. KSC-01pp1549

    NASA Image and Video Library

    2001-09-04

    KODIAK ISLAND, Alaska -- At the Launch Service Structure, Kodiak Launch Complex (KLC), the fairing is lowered over the Kodiak Star spacecraft in preparation for launch. The first orbital launch to take place from KLC, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  20. KSC01kodi080

    NASA Image and Video Library

    2001-09-05

    KODIAK ISLAND, ALASKA - The Launch Service Structure, Kodiak Launch Complex (KLC), on Kodiak Island is viewed from a distance. Kodiak Star, the first launch to take place from KLC, is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  1. KSC01KODI045

    NASA Image and Video Library

    2001-05-31

    KODIAK ISLAND, Alaska -- Technicians inspect and secure Castor 120, the first stage of the Athena 1 launch vehicle, on the launch mount at Kodiak Island, Alaska, as processing for the launch of Kodiak Star proceeds. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  2. KSC01KODI036

    NASA Image and Video Library

    2001-05-29

    KODIAK ISLAND, Alaska -- A boat moves a ramp into place that will allow Castor 120, the first stage of the Athena 1 launch vehicle, to safely move onto the dock at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  3. Adapting the Reconfigurable SpaceCube Processing System for Multiple Mission Applications

    NASA Technical Reports Server (NTRS)

    Petrick, Dave

    2014-01-01

    This paper will detail the use of SpaceCube in multiple space flight applications including the Hubble Space Telescope Servicing Mission 4 (HST-SM4), an International Space Station (ISS) radiation test bed experiment, and the main avionics subsystem for two separate ISS attached payloads. Each mission has had varying degrees of data processing complexities, performance requirements, and external interfaces. We will show the methodology used to minimize the changes required to the physical hardware, FPGA designs, embedded software interfaces, and testing.This paper will summarize significant results as they apply to each mission application. In the HST-SM4 application we utilized the FPGA resources to accelerate portions of the image processing algorithms more than 25 times faster than a standard space processor in order to meet computational speed requirements. For the ISS radiation on-orbit demonstration, the main goal is to show that we can rely on the commercial FPGAs and processors in a space environment. We describe our FPGA and processor radiation mitigation strategies that have resulted in our eight PowerPCs being available and error free for more than 99.99 of the time over the period of four years. This positive data and proven reliability of the SpaceCube on ISS resulted in the Department of Defense (DoD) selecting SpaceCube, which is replacing an older and slower computer currently used on ISS, as the main avionics for two upcoming ISS experiment campaigns. This paper will show how we quickly reconfigured the SpaceCube system to meet the more stringent reliability requirements

  4. Space Technology Research Vehicle (STRV)-2 program

    NASA Astrophysics Data System (ADS)

    Shoemaker, James; Brooks, Paul; Korevaar, Eric J.; Arnold, Graham S.; Das, Alok; Stubstad, John; Hay, R. G.

    2000-11-01

    The STRV-2 program is the second in a series of three collaborative flight test programs between the U.S. Ballistic Missile Defense Organization (BMDO) and the United Kingdom (UK) Minstry of Defence (MoD). The STRV-2 Experiment Module contains five major experiments to provide proof-of-concept data on system design, data on the mid-earth orbit (MEO) space environment, and data on durability of materials and components operating in the MEO environment. The UK Defence Evaluation and Research Agency (DERA) has provided a mid- wavelength infrared (MWIF) imager to evaluate passive detection of aircraft from space. BMDO, in conjunction with the US Air Force Research Laboratory (AFRL) and the National Aeronautics and Space Administration (NASA), have provided experiments to evaluate use of adaptive structures for vibration suppression, to investigate the use of high bandwidth laser communications to transmit data from space to ground or airborne receivers, to study the durability of materials and components in the MEO space environment, and to measure radiation and micrometeoroid/debris fluence. These experiments are mounted on all- composite structure. This structure provides a significant reduction in weight and cost over comparable aluminum designs while maintaining the high stiffness required by optical payloads. In 1994, STRV-2 was manifested for launch by the DOD Space Test Program. STRV-2, the primary payload on the Tri-Service eXperiment (TSX)-5 spacecraft, was successfully launched on 7 June 2000 on a Pegasus XL from Vandenbery AFB, CA. The STRV-2 program, like the companion STRV-1 program, validates the viability of multi-national, multi-agency collaborations to provide cost effective acquisition of space test data. The experimental data to be obtained will reduce future satellite risk and provide guidelines for further system development.

  5. Creating the Deep Space Environment for Testing the James Webb Space Telescope (JWST) at NASA Johnson Space Center's Chamber A

    NASA Technical Reports Server (NTRS)

    Homan, Jonathan L.; Cerimele, Mary P.; Montz, Michael E.; Bachtel, Russell; Speed, John; O'Rear, Patrick

    2013-01-01

    Chamber A is the largest thermal vacuum chamber at the Johnson Space Center and is one of the largest space environment chambers in the world. The chamber is 19.8 m (65 ft) in diameter and 36.6 m (120 ft) tall and is equipped with cryogenic liquid nitrogen panels (shrouds) and gaseous helium shrouds to create a simulated space environment. It was originally designed and built in the mid 1960 s to test the Apollo Command and Service Module and several manned tests were conducted on that spacecraft, contributing to the success of the program. The chamber has been used since that time to test spacecraft active thermal control systems, Shuttle DTO, DOD, and ESA hardware in simulated Low Earth Orbit (LEO) conditions. NASA is now moving from LEO towards exploration of locations with environments approaching those of deep space. Therefore, Chamber A has undergone major modifications to enable it to simulate these deeper space environments. Environmental requirements were driven, and modifications were funded by the James Webb Space Telescope program, and this telescope which will orbit Solar/Earth L2, will be the first test article to benefit from the chamber s new capabilities. To accommodate JWST, the Chamber A high vacuum system has been modernized, additional LN2 shrouds have been installed, the liquid nitrogen system has been modified to remove dependency on electrical power and increase its reliability, a new helium shroud/refrigeration system has been installed to create a colder more stable and uniform heat sink, and the controls have been updated to increase the level of automation and improve operator interfaces. Testing of these major modifications was conducted in August of 2012 and this initial test was very successful, with all major systems exceeding their performance requirements. This paper will outline the changes in overall environmental requirements, discuss the technical design data that was used in the decisions leading to the extensive modifications, and describe the new capabilities of the chamber.

  6. Creating the Deep Space Environment for Testing the James Webb Space Telescope at NASA Johnson Space Center's Chamber A

    NASA Technical Reports Server (NTRS)

    Homan, Jonathan L.; Cerimele, Mary P.; Montz, Michael E.; Bachtel, Russell; Speed, John; O'Rear, Patrick

    2013-01-01

    Chamber A is the largest thermal vacuum chamber at the Johnson Space Center and is one of the largest space environment chambers in the world. The chamber is 19.8 m (65 ft.) in diameter and 36.6 m (120 ft.) tall and is equipped with cryogenic liquid nitrogen panels (shrouds) and gaseous helium shrouds to create a simulated space environment. It was originally designed and built in the mid 1960 s to test the Apollo Command and Service Module and several manned tests were conducted on that spacecraft, contributing to the success of the program. The chamber has been used since that time to test spacecraft active thermal control systems, Shuttle DTO, DOD, and ESA hardware in simulated Low Earth Orbit (LEO) conditions. NASA is now moving from LEO towards exploration of locations with environments approaching those of deep space. Therefore, Chamber A has undergone major modifications to enable it to simulate these deeper space environments. Environmental requirements were driven, and modifications were funded by the James Webb Space Telescope program, and this telescope, which will orbit Solar/Earth L2, will be the first test article to benefit from the chamber s new capabilities. To accommodate JWST, the Chamber A high vacuum system has been modernized, additional LN2 shrouds have been installed, the liquid nitrogen system has been modified to minimize dependency on electrical power and increase its reliability, a new helium shroud/refrigeration system has been installed to create a colder more stable and uniform heat sink, and the controls have been updated to increase the level of automation and improve operator interfaces. Testing of these major modifications was conducted in August of 2012 and this initial test was very successful, with all major systems exceeding their performance requirements. This paper will outline the changes in overall environmental requirements, discuss the technical design data that was used in the decisions leading to the extensive modifications, and describe the new capabilities of the chamber.

  7. Creating the Deep Space Environment for Testing the James Webb Space Telescope at the Johnson Space Center's Chamber A

    NASA Technical Reports Server (NTRS)

    Homan, Jonathan L.; Cerimele, Mary P.; Montz, Michael E.

    2012-01-01

    Chamber A is the largest thermal vacuum chamber at the Johnson Space Center and is one of the largest space environment chambers in the world. The chamber is 19.8 m (65 ft) in diameter and 36.6 m (120 ft) tall and is equipped with cryogenic liquid nitrogen panels (shrouds) and gaseous helium shrouds to create a simulated space environment. It was originally designed and built in the mid 1960's to test the Apollo Command and Service Module and several manned tests were conducted on that spacecraft, contributing to the success of the program. The chamber has been used since that time to test spacecraft active thermal control systems, Shuttle DTO, DOD, and ESA hardware in simulated Low Earth Orbit (LEO) conditions. NASA is now moving from LEO towards exploration of locations with environments approaching those of deep space. Therefore, Chamber A has undergone major modifications to enable it to simulate these deeper space environments. Environmental requirements were driven, and the modifications were funded, by the James Webb Space Telescope program, and this telescope which will orbit Solar/Earth L2, will be the first test article to benefit from the chamber s new capabilities. To accommodate JWST, the Chamber A high vacuum system has been modernized, additional LN2 shrouds have been installed, the liquid nitrogen system has been modified to remove dependency on electrical power and increase its reliability, a new helium shroud/refrigeration system has been installed to create a colder more stable and uniform heat sink and, the controls have been updated to increase the level of automation and improve operator interfaces. Testing of these major modifications was conducted in August 2012 and this initial test was very successful, with all major systems exceeding their performance requirements. This paper will outline the changes in the overall environmental requirements, discuss the technical design data that was used in the decisions leading to the extensive modifications, and describe the new capabilities of the chamber.

  8. Capacity fade of LiAlyNi1-x-yCoxO2 cathode for lithium-ion batteries during accelerated calendar and cycle life tests (surface analysis of LiAlyNi1-x-yCoxO2 cathode after cycle tests in restricted depth of discharge ranges)

    NASA Astrophysics Data System (ADS)

    Watanabe, Shoichiro; Kinoshita, Masahiro; Hosokawa, Takashi; Morigaki, Kenichi; Nakura, Kensuke

    2014-07-01

    Cycle performance at 60 °C for a Li Al0.10Ni0.76Co0.14O2 (NCA) cathode/graphite cell was greatly improved when a DOD range in charge-discharge cycling (ΔDOD) was restricted. The deterioration mechanism was analyzed by X-ray photoelectron spectroscopy (XPS), high-angle annular dark-field scanning transmission electron microscopy (HAADF-STEM) and scanning transmission electron microscopy-electron energy-loss spectroscopy (STEM-EELS). Only after the cycle test in the ΔDOD of 0-100%, many micro-cracks were generated in the inter-surface between the primary particles which aggregated to form the secondary particles, and a NiO-like resistance layer with Fm3m rock salt structure was formed on each primary particle which was contact with other primary particles and electrolyte. It can be concluded that the lack of contact between the primary particles with the micro-crack generation and the formation of the new resistance layer are responsible for the capacity fading and the rise in impedance during charge-discharge cycle in the wide ΔDOD.

  9. 2000 Digital Avionics Highlights

    NASA Technical Reports Server (NTRS)

    Polites, Michael E.

    2000-01-01

    This article summarizes the highlights of recent events and developments in digital avionics in commercial aviation, military systems, and space. This article is about 1,200 words long. Information for the article was collected from other NASA centers, DoD, and industry. All information was previously cleared by the originating organizations. Information for the article was also gathered from Aviation Week and Space Technology and similar sources.

  10. A Systems Approach to High Performance Buildings: A Computational Systems Engineering R&D Program to Increase DoD Energy Efficiency

    DTIC Science & Technology

    2012-02-01

    for Low Energy Building Ventilation and Space Conditioning Systems...Building Energy Models ................... 162 APPENDIX D: Reduced-Order Modeling and Control Design for Low Energy Building Systems .... 172 D.1...Design for Low Energy Building Ventilation and Space Conditioning Systems This section focuses on the modeling and control of airflow in buildings

  11. Development of Low Temperature Li-Ion Electrolytes for NASA and DoD Applications

    NASA Technical Reports Server (NTRS)

    Smart, M.; Ratnakumar, B.; Surampudi, S.; Plichta, E.; Hendrickson, M.; Thompson, R.; Au, G.; Behl, W.

    1999-01-01

    Both NASA and the U.S. Army have interest in developing secondary energy storage devices with improved low temperature performance to meet the demanding requirements of space missions and man-portable applications.

  12. Overview of the 1986 free-piston Stirling SP-100 activities at the NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Slaby, J. G.

    1986-01-01

    An overview of the NASA Lewis Research Center SP-100 free-piston Stirling engine activities is presented. These activities include a free-piston Stirling space-power technology feasibility demonstration project as part of the SP-100 program being conducted in support of the Department of Defennse (DOD), Department of Energy (DOE), and NASA. The space-power Stirling advanced technology effort, under SP-100, addresses the status of the 25 kWe Space Power Demonstrator Engine (SPDE) including test results. Future space-power projections are presented along with a description of a study that will investigate the feasibility of scaling a single-cylinder free-piston Stirling space-power module to the 150 kW power range. Design parameters and conceptual design features will be presented for a 25 kWe, single-cylinder free-piston Stirling space-power converter. A description of a hydrodynamic gas bearing concept is presented whereby the displacer of a 1 kWe free-piston Stirling engine is modified to demonstrate the bearing concept. And finally the goals of a conceptual design for a 25 kWe Solar Advanced Stirling Conversion System capable of delivering electric power to an electric utility grid are discussed.

  13. Overview of the 1986 free-piston Stirling SP-100 activities at the NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Slaby, J. G.

    1986-01-01

    An overview of the NASA Lewis Research Center SP-100 free-piston Stirling engine activities is presented. These activities include a free-piston Stirling space-power technology feasibility demonstration project as part of the SP-100 program being conducted in support of the Department of Defense (DOD), Department of Energy (DOE), and NASA. The space-power Stirling advanced technology effort, under SP-100, addresses the status of the 25 kWe Space Power Demonstrator Engine (SPDE) including test results. Future space-power projections are presented along with a description of a study that will investigate the feasibility of scaling a single-cylinder free-piston Stirling space-power module to the 150 kW power range. Design parameters and conceptual design features will be presented for a 25 kWe, single-cylinder free-piston Stirling space-power converter. A description of a hydrodynamic gas bearing concept is presented whereby the displacer of a 1 kWe free-piston Stirling engine is modified to demonstrate the bearing concept. And finally the goals of a conceptual design for a 25 kWe Solar Advanced Stirling Conversion System capable of delivering electric power to an electric utility grid are discussed.

  14. Characteristics and Trade-Offs of Doppler Lidar Global Wind Profiling

    NASA Technical Reports Server (NTRS)

    Kavaya, Michael J.; Emmitt, G David

    2004-01-01

    Accurate, global profiling of wind velocity is highly desired by NASA, NOAA, the DOD/DOC/NASA Integrated Program Office (IPO)/NPOESS, DOD, and others for many applications such as validation and improvement of climate models, and improved weather prediction. The most promising technology to deliver this measurement from space is Doppler Wind Lidar (DWL). The NASA/NOAA Global Tropospheric Wind Sounder (GTWS) program is currently in the process of generating the science requirements for a space-based sensor. In order to optimize the process of defining science requirements, it is important for the scientific and user community to understand the nature of the wind measurements that DWL can make. These measurements are very different from those made by passive imaging sensors or by active radar sensors. The purpose of this paper is to convey the sampling characteristics and data product trade-offs of an orbiting DWL.

  15. Business Case Analysis for the Versatile Depot Automated Test Station Used in the USAF Warner Robins Air Logistics Center Maintenance Depot

    DTIC Science & Technology

    2008-06-01

    executes the avionics test) can run on the new ATS thus creating the common ATS framework . The system will also enable numerous new functional...Enterprise-level architecture that reflects corporate DoD priorities and requirements for business systems, and provides a common framework to ensure that...entire Business Mission Area (BMA) of the DoD. The BEA also contains a set of integrated Department of Defense Architecture Framework (DoDAF

  16. Key Features of the Deployed NPP/NPOESS Ground System

    NASA Astrophysics Data System (ADS)

    Heckmann, G.; Grant, K. D.; Mulligan, J. E.

    2010-12-01

    The National Oceanic & Atmospheric Administration (NOAA), Department of Defense (DoD), and National Aeronautics & Space Administration (NASA) are jointly acquiring the next-generation weather/environmental satellite system; the National Polar-orbiting Operational Environmental Satellite System (NPOESS). NPOESS replaces the current NOAA Polar-orbiting Operational Environmental Satellites (POES) and DoD Defense Meteorological Satellite Program (DMSP). NPOESS satellites carry sensors to collect meteorological, oceanographic, climatological, and solar-geophysical data of the earth, atmosphere, and space. The ground data processing segment is the Interface Data Processing Segment (IDPS), developed by Raytheon Intelligence & Information Systems (IIS). The IDPS processes NPOESS Preparatory Project (NPP)/NPOESS satellite data to provide environmental data products/records (EDRs) to NOAA and DoD processing centers operated by the US government. The IDPS will process EDRs beginning with NPP and continuing through the lifetime of the NPOESS system. The command & telemetry segment is the Command, Control & Communications Segment (C3S), also developed by Raytheon IIS. C3S is responsible for managing the overall NPP/NPOESS missions from control & status of the space and ground assets to ensuring delivery of timely, high quality data from the Space Segment to IDPS for processing. In addition, the C3S provides the globally-distributed ground assets needed to collect and transport mission, telemetry, and command data between the satellites and processing locations. The C3S provides all functions required for day-to-day satellite commanding & state-of-health monitoring, and delivery of Stored Mission Data to each Central IDP for data products development and transfer to system subscribers. The C3S also monitors and reports system-wide health & status and data communications with external systems and between the segments. The C3S & IDPS segments were delivered & transitioned to operations for NPP. C3S transitioned to operations at the NOAA Satellite Operations Facility (NSOF) in Suitland Maryland in August 2007 and IDPS transitioned in July 2009. Both segments were involved with several compatibility tests with the NPP Satellite at the Ball Aerospace Technology Corporation (BATC) factory. The compatibility tests involved the spacecraft bus, the four sensors (VIIRS, ATMS, CrIS and OMPS), and both ground segments flowing data between the NSOF and BATC factory and flowing data from the polar ground station (Svalbard) over high-speed links back to the NSOF and the two IDP locations (NESDIS & AFWA). This presentation will describe the NPP/NPOESS ground architecture features & enhancements for the NPOESS era. These will include C3S-provided space-to-ground connectivity, reliable and secure data delivery and insight & oversight of the total operation. For NPOESS the ground architecture is extended to provide additional ground receptor sites to reduce data product delivery times to users and delivery of additional sensor data products from sensors similar to NPP and more NPOESS sensors. This architecture is also extended from two Centrals (NESDIS & AFWA) to two additional Centrals (FNMOC & NAVO). IDPS acts as a buffer minimizing changes in how users request and receive data products.

  17. Improving The Near-Earth Meteoroid And Orbital Debris Environment Definition With LAD-C

    NASA Technical Reports Server (NTRS)

    Liou, J.-C.; Giovane, F. J.; Corsaro, R. C.; Burchell, M. J.; Drolshagen, G.; Kawai, H.; Tabata, M.; Stansbery, E. G.; Westphal, A. J.; Yano, H.

    2006-01-01

    To improve the near-Earth meteoroid and orbital debris environment definition, a large area particle sensor/collector is being developed to be placed on the International Space Station (ISS). This instrument, the Large Area Debris Collector (LAD-C), will attempt to record meteoroid and orbital debris impact flux, and capture the same particles with aerogel. After at least one year of deployment, the whole system will be brought back for additional laboratory analysis of the captured meteoroids and orbital debris. This project is led by the U.S. Naval Research Laboratory (NRL) while the U.S. Department of Defense (DoD) Space Test Program (STP) is responsible for the integration, deployment, and retrieval of the system. Additional contributing team members of the consortium include the NASA Orbital Debris Program Office, JAXA Institute of Space and Astronautical Science (ISAS), Chiba University (Japan), ESA Space Debris Office, University of Kent (UK), and University of California at Berkeley. The deployment of LAD-C on the ISS is planned for 2008, with the system retrieval in late 2009.

  18. The Case For Space: A Legislative Framework For An Independent United States Space Force

    DTIC Science & Technology

    2018-04-01

    However, this proposal has merit, and is the subject of extensive studies . AU/ACSC/Neil, M/Grant, D/AY18 10 One primary purpose of such...issues with DOD space acquisition, yet even within this one confined area of study noted problems that appear to be systemic. The GAO report...recommendations drawn from these studies seem to have fallen on deaf ears, and whatever changes these various studies prompted failed to adequately address

  19. 32 CFR Appendix A to Part 68 - DOD Voluntary Education Partnership Memorandum of Understanding (MOU) Between DoD Office of the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... multimedia) and correspondence courses. d. This MOU includes high school programs, academic skills programs... competency testing; make course placement based on student readiness. (8) Designate a person or office at the... eliminate aggressive marketing aimed at Service members. h. Refrain from high-pressure recruitment tactics...

  20. 76 FR 81940 - Submission for OMB Review; Biobased Procurements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Procurements AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Products Under Service and Construction Contracts, is being revised to require prime contractors to report...

  1. EO/IR scene generation open source initiative for real-time hardware-in-the-loop and all-digital simulation

    NASA Astrophysics Data System (ADS)

    Morris, Joseph W.; Lowry, Mac; Boren, Brett; Towers, James B.; Trimble, Darian E.; Bunfield, Dennis H.

    2011-06-01

    The US Army Aviation and Missile Research, Development and Engineering Center (AMRDEC) and the Redstone Test Center (RTC) has formed the Scene Generation Development Center (SGDC) to support the Department of Defense (DoD) open source EO/IR Scene Generation initiative for real-time hardware-in-the-loop and all-digital simulation. Various branches of the DoD have invested significant resources in the development of advanced scene and target signature generation codes. The SGDC goal is to maintain unlimited government rights and controlled access to government open source scene generation and signature codes. In addition, the SGDC provides development support to a multi-service community of test and evaluation (T&E) users, developers, and integrators in a collaborative environment. The SGDC has leveraged the DoD Defense Information Systems Agency (DISA) ProjectForge (https://Project.Forge.mil) which provides a collaborative development and distribution environment for the DoD community. The SGDC will develop and maintain several codes for tactical and strategic simulation, such as the Joint Signature Image Generator (JSIG), the Multi-spectral Advanced Volumetric Real-time Imaging Compositor (MAVRIC), and Office of the Secretary of Defense (OSD) Test and Evaluation Science and Technology (T&E/S&T) thermal modeling and atmospherics packages, such as EOView, CHARM, and STAR. Other utility packages included are the ContinuumCore for real-time messaging and data management and IGStudio for run-time visualization and scenario generation.

  2. Space station: Cost and benefits

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Costs for developing, producing, operating, and supporting the initial space station, a 4 to 8 man space station, and a 4 to 24 man space station are estimated and compared. These costs include contractor hardware; space station assembly and logistics flight costs; and payload support elements. Transportation system options examined include orbiter modules; standard and extended duration STS fights; reusable spacebased perigee kick motor OTV; and upper stages. Space station service charges assessed include crew hours; energy requirements; payload support module storage; pressurized port usage; and OTV service facility. Graphs show costs for science missions, space processing research, small communication satellites; large GEO transportation; OVT launch costs; DOD payload costs, and user costs.

  3. Autonomous Mission Manager for Rendezvous, Inspection and Mating

    NASA Technical Reports Server (NTRS)

    Zimpfer, Douglas J.

    2003-01-01

    To meet cost and safety objectives, space missions that involve proximity operations between two vehicles require a high level of autonomy to successfully complete their missions. The need for autonomy is primarily driven by the need to conduct complex operations outside of communication windows, and the communication time delays inherent in space missions. Autonomy also supports the goals of both NASA and the DOD to make space operations more routine, and lower operational costs by reducing the requirement for ground personnel. NASA and the DoD have several programs underway that require a much higher level of autonomy for space vehicles. NASA's Space Launch Initiative (SLI) program has ambitious goals of reducing costs by a factor or 10 and improving safety by a factor of 100. DARPA has recently begun its Orbital Express to demonstrate key technologies to make satellite servicing routine. The Air Force's XSS-ll program is developing a protoflight demonstration of an autonomous satellite inspector. A common element in space operations for many NASA and DOD missions is the ability to rendezvous, inspect anclJor dock with another spacecraft. For DARPA, this is required to service or refuel military satellites. For the Air Force, this is required to inspect un-cooperative resident space objects. For NASA, this is needed to meet the primary SLI design reference mission of International Space Station re-supply. A common aspect for each of these programs is an Autonomous Mission Manager that provides highly autonomous planning, execution and monitoring of the rendezvous, inspection and docking operations. This paper provides an overview of the Autonomous Mission Manager (AMM) design being incorporated into many of these technology programs. This AMM provides a highly scalable level of autonomous operations, ranging from automatic execution of ground-derived plans to highly autonomous onboard planning to meet ground developed mission goals. The AMM provides the capability to automatically execute the plans and monitor the system performance. In the event of system dispersions or failures the AMM can modify plans or abort to assure overall system safety. This paper describes the design and functionality of Draper's AMM framework, presents concept of operations associated with the use of the AMM, and outlines the relevant features of the flight demonstrations.

  4. Photonic packaging for space applications

    NASA Astrophysics Data System (ADS)

    Parkerson, James P.; Chalfant, Charles H., III; Orlando, Fred J., Jr.; Hull, Tony

    2002-07-01

    Industrial, NASA, and DOD spacecraft designers have recognized the advantages of using fiber optic components and networks for their internal satellite data handling needs. Among the benefits are the total elimination of cable-to-cable and box-to-box EMI; significant size, weight and power reduction; greater on-orbit flexibility, simplified integration and test (I&T), and significantly lower I&T costs. Additionally, intra-satellite data rates of 1 to 10 Gbps appear to be an absolute requirement for a number of advanced systems planned for development in the next few years. The only practical way to support these data rates is with fiber optics. Space Photonics and the University of Arkansas have developed fiber optic components (FireFiberTM) and networks that are designed specifically to meet these on-board, high data rate needs using NASA approved materials, packaging processes, and approved radiation tolerant devices. This paper discusses issues relevant to these components and networks.

  5. 78 FR 72620 - Federal Acquisition Regulation; Higher-Level Contract Quality Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE.... IV. Regulatory Flexibility Act The Department of Defense (DoD), the General Services Administration...-AM65 Federal Acquisition Regulation; Higher-Level Contract Quality Requirements AGENCY: Department of...

  6. 78 FR 17176 - Federal Acquisition Regulation; Defense Base Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Regulation; Defense Base Act AGENCIES: Department of Defense (DoD), General Services Administration (GSA... subcontractor responsibilities to obtain workers' compensation insurance or to qualify as a self-insurer, and...

  7. 76 FR 81942 - Federal Acquisition Regulation; Information Collection; Progress Payments (SF-1443)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ...; Information Collection; Progress Payments (SF-1443) AGENCIES: Department of Defense (DOD), General Services... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... requirement concerning progress payments. Public comments are particularly invited on: Whether this collection...

  8. Retrospective study of urinalysis for dl-amphetamine and dl-methamphetamine analysis under current Department of Defense guidelines.

    PubMed

    Shippee, R L; Kippenberger, D J

    2000-09-01

    Under current Department of Defense (DOD) directive, the laboratories certified to conduct urinalyis testing in support of the DOD Drug Deterrence Program are required to conduct dl-isomer analysis on all specimens that confirm at a concentration greater than 500 ng/mL methamphetamine (METH). Although the same cutoff concentration is required for amphetamine (AMP) reporting, there is no requirement for dl-isomer analysis of AMP-positive specimens. Of the 894,823 specimens screened by the Army Drug Testing Laboratory at Ft. Meade, MD during a 19-month period, 339 confirmed positive for METH. From this positive population, seven specimens failed to confirm at or above the DOD cutoff of > 20% d-isomer. One of the seven specimens contained 534 ng/mL l-AMP and was reported positive for AMP. Although 100% of the AMP was the l-isomer, under current DOD directive, this information was not passed along to the Medical Review Officers (MRO) to assist them during the interview process. Although this situation appears to be a rare event, consideration should be given to requiring dl-isomer analysis of AMP-positive specimens and forwarding this information to the MRO.

  9. The Space Shuttle: An Attempt at Low-Cost, Routine Access to Space

    DTIC Science & Technology

    1990-09-01

    thinking on new heavy-lift launch systems. The thesis objective is to show the Space Shuttle was an attempt at developing a routine, low-cost access to... development costs were those used to create a launch facility at Vandenburg Air Force Base. DOD agreed in 1971 not to develop any new launch vehicles...booster. • To reduce the design weight of the Shuttle so as not to decrease the 65,000 pound payload capability. * To develop a new thermal protection

  10. Validation and verification of the laser range safety tool (LRST)

    NASA Astrophysics Data System (ADS)

    Kennedy, Paul K.; Keppler, Kenneth S.; Thomas, Robert J.; Polhamus, Garrett D.; Smith, Peter A.; Trevino, Javier O.; Seaman, Daniel V.; Gallaway, Robert A.; Crockett, Gregg A.

    2003-06-01

    The U.S. Dept. of Defense (DOD) is currently developing and testing a number of High Energy Laser (HEL) weapons systems. DOD range safety officers now face the challenge of designing safe methods of testing HEL's on DOD ranges. In particular, safety officers need to ensure that diffuse and specular reflections from HEL system targets, as well as direct beam paths, are contained within DOD boundaries. If both the laser source and the target are moving, as they are for the Airborne Laser (ABL), a complex series of calculations is required and manual calculations are impractical. Over the past 5 years, the Optical Radiation Branch of the Air Force Research Laboratory (AFRL/HEDO), the ABL System Program Office, Logicon-RDA, and Northrup-Grumman, have worked together to develop a computer model called teh Laser Range Safety Tool (LRST), specifically designed for HEL reflection hazard analyses. The code, which is still under development, is currently tailored to support the ABL program. AFRL/HEDO has led an LRST Validation and Verification (V&V) effort since 1998, in order to determine if code predictions are accurate. This paper summarizes LRST V&V efforts to date including: i) comparison of code results with laboratory measurements of reflected laser energy and with reflection measurements made during actual HEL field tests, and ii) validation of LRST's hazard zone computations.

  11. Exploration of the utility of military man in space in the year 2025

    NASA Astrophysics Data System (ADS)

    Hansen, Daniel L.

    1992-03-01

    It is absolutely essential for the well being of today's space forces as well as the future space forces of 2025, that DOD develop manned advanced technology space systems in lieu of or in addition to unmannned systems to effectively utilize mulitary man's compelling and aggressive warfighting abilities to accomplish the critical wartime mission elements of space control and force application. National space policy, military space doctrine and common all dictate they should do so if space superiority during future, inevitable conflict with enemy space forces is the paramount objective. Deploying military man in space will provide that space superiority and he will finally become the 'center of gravity' of the U.S. space program.

  12. Breaking in the Space Shuttle

    NASA Astrophysics Data System (ADS)

    Crippen, Robert L.

    2002-01-01

    I like to look forward, but I am also a great student of history. I believe there are many lessons, both positive and negative, that we can learn by looking back. Quite often, we tend to forget some of those. I'd like to speak a little bit about the era in which I entered the astronaut corps. I joined NASA in kind of a weird way-in the time period when everybody going into space was a test pilot. I was attending the Air Force Test Pilot School, even though I'm a Navy guy. In that time period, they were going through and selecting astronauts from the test pilot class, and I put my hand up and said, "I'd like to join." It turned out that both NASA and the Department of Defense were selecting astronauts, and, somewhere in the selection process, I ended up having to make a choice. There were lots of folks on the NASA list, and there weren't many folks on the Department of Defense list, so I figured that was my best chance to fly. So I said, "Send me to DoD for something called the Manned Orbital Laboratory," or MOL for short.

  13. Ten-year space launch technology plan

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This document is the response to the National Space Policy Directive-4 (NSPD-4), signed by the President on 10 Jul. 1991. Directive NSPD-4 calls upon the Department of Defense (DoD), the Department of Energy (DOE), and the National Aeronautics and Space Administration (NASA) to coordinate national space launch technology efforts and to jointly prepare a 10-year space launch technology plan. The nation's future in space rests on the strength of its national launch technology program. This plan documents our current launch technology efforts, plans for future initiatives in this arena, and the overarching philosophy that links these activities into an integrated national technology program.

  14. KSC01kodi079

    NASA Image and Video Library

    2001-09-05

    KODIAK ISLAND, ALASKA - A transporter moves the encapsulated Kodiak Star spacecraft into position in the Launch Service Structure, Kodiak Launch Complex (KLC), for final stacking for launch. The first launch to take place from KLC, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  15. KSC01KODI051

    NASA Image and Video Library

    2001-06-19

    KODIAK ISLAND, Alaska -- Technicians lower the fueled Orbit Adjust Model (OAM), which navigates payloads into the correct orbit, onto Orbis 21D Equipment Section Boost Motor, the second stage of the Athena 1 launch vehicle, at the launch pad at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  16. KSC01kodi075

    NASA Image and Video Library

    2001-09-04

    KODIAK ISLAND, ALASKA - In the Launch Service Structure, Kodiak Launch Complex (KLC), the Kodiak Star spacecraft is ready for encapsulation in the fairing seen at right, above. The first launch to take place from KLC, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  17. KSC01KODI050

    NASA Image and Video Library

    2001-06-19

    KODIAK ISLAND, Alaska -- The fueled Orbit Adjust Model (OAM), which navigates payloads into the correct orbit, is installed onto Orbis 21D Equipment Section Boost Motor, the second stage of the Athena 1 launch vehicle, at the launch pad at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  18. KSC-01pp1547

    NASA Image and Video Library

    2001-09-04

    KODIAK ISLAND, Alaska -- In the Launch Service Structure, Kodiak Launch Complex (KLC), workers check the fairing that is to be placed around the Kodiak Star spacecraft in preparation for launch. The first orbital launch to take place from KLC, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  19. KSC01KODI037

    NASA Image and Video Library

    2001-05-29

    KODIAK ISLAND, Alaska -- The Orbis 21D Equipment Section Boost Motor, the second stage of the Athena 1 launch vehicle, waits for the first stage, Castor 120, to be towed up the steepest part of the road, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  20. KSC-01pp1548

    NASA Image and Video Library

    2001-09-04

    KODIAK ISLAND, Alaska -- Inside the Launch Service Structure, Kodiak Launch Complex (KLC), workers watch as the fairing (background) is lifted before encapsulating the Kodiak Star spacecraft in preparation for launch. The first orbital launch to take place from KLC, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  1. KSC01kodi076

    NASA Image and Video Library

    2001-09-04

    KODIAK ISLAND, ALASKA - In the Launch Service Structure, Kodiak Launch Complex (KLC), the fairing is lowered over the Kodiak Star spacecraft in preparation for launch. The first launch to take place from KLC, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  2. KSC01kodi074

    NASA Image and Video Library

    2001-09-04

    KODIAK ISLAND, ALASKA - In the Launch Service Structure, Kodiak Launch Complex (KLC), the Kodiak Star spacecraft is ready for encapsulation in the fairing, as preparation for launch. The first launch to take place from KLC, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  3. An evaluation of the documented requirements of the SSP UIL and a review of commercial software packages for the development and testing of UIL prototypes

    NASA Technical Reports Server (NTRS)

    Gill, Esther Naomi

    1986-01-01

    A review was conducted of software packages currently on the market which might be integrated with the interface language and aid in reaching the objectives of customization, standardization, transparency, reliability, maintainability, language substitutions, expandability, portability, and flexibility. Recommendations are given for best choices in hardware and software acquisition for inhouse testing of these possible integrations. Software acquisition in the line of tools to aid expert-system development and/or novice program development, artificial intelligent voice technology and touch screen or joystick or mouse utilization as well as networking were recommended. Other recommendations concerned using the language Ada for the user interface language shell because of its high level of standardization, structure, and ability to accept and execute programs written in other programming languages, its DOD ownership and control, and keeping the user interface language simple so that multiples of users will find the commercialization of space within their realm of possibility which is, after all, the purpose of the Space Station.

  4. 76 FR 26220 - Federal Acquisition Regulation; Socioeconomic Program Parity

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Federal Acquisition Regulation; Socioeconomic Program Parity AGENCY: Department of Defense (DoD), General... expectation exists (see 19.502-3 as to partial set-asides). Although past acquisition history of an item or...

  5. 48 CFR 246.472 - Inspection stamping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 246.472 Inspection stamping. (a) DoD quality inspection approval marking designs (stamps) may be used for both prime...) Policies and procedures regarding the use of National Aeronautics and Space Administration (NASA) quality...

  6. 77 FR 19287 - Federal Acquisition Regulation; Submission for OMB Review; Progress Payments (SF-1443)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ...; Submission for OMB Review; Progress Payments (SF-1443) AGENCY: Department of Defense (DOD), General Services... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... requirement concerning progress payments. A notice was published in [[Page 19288

  7. Humanitarian assistance and disaster relief: changing the face of defense.

    PubMed

    Laraby, Patrick R; Bourdeaux, Margaret; Casscells, S Ward; Smith, David J; Lawry, Lynn

    2009-01-01

    The US Department of Defense (DOD) is evolving to meet new security challenges in the twenty-first century. Today's challenges result from growing political, environmental, and economic instability in important areas of the globe that threaten national and global security. Immediate outreach to foreign nations in times of violent instability or natural disaster fosters security and stability both for the affected country and for the United States. Foreign humanitarian assistance (FHA) is a rapidly evolving military mission that addresses conflict prevention, conflict, postconflict, and natural disasters. With DOD's extensive global medical resources, it is often uniquely qualified to execute a critical role in relief and/or public health efforts. When and how the American military will act in FHA and disaster relief is a still evolving doctrine with three issues deserving particular attention: aligning operations with host government leadership, preserving humanitarian space, and tailoring the US military's unique resources to the specific political and medical situation at hand. The DOD's response to a large-scale earthquake in Peru suggests useful approaches to these three issues, provides a template for future FHA mission, and points to strategic decisions and operational capabilities that need further development to establish the FHA mission firmly within DOD's repertoire of security engagement activities.

  8. Sustaining Space Systems for Strategic and Theater Operations: A Study Perspective

    NASA Technical Reports Server (NTRS)

    McCoy, Walbert

    1995-01-01

    Our Desert Storm experience in the tactical utility of DoD space vehicles demonstrated that DoD's investment in space technology can provide a significant military advantage during times of crisis and war. The satellites what gave us such marvelous intelligence in locating, tracking, and enabling the successful attack of key targets resulted in a spectacular military success. However, without an on-orbit servicing capability, the fuel consumed to maneuver these satellites into position over the battlefield shortened their useful life by as much as two years. During the 1970's and 1980's, the Air Force aggressively pursued an or-orbit support capability to support and maintain it's space-based assets. However, in the early 1990's, budgetary and political priorities canceled the programs that would have made this a reality. Realizing that a future decision may be made to re-investigate on-orbit support, the United States Space Command (USSPACECOM) sponsored a study to document efforts undertaken by the Air Force during the 1970's and 1980's in developing strategies and actions to achieve certain tenets of on-orbit support. The study represents an attempt to gather, review, summarize, and archive the most important research performed during this period. It will serve as a historical perspective upon which to base future research and development activities. This paper presents an overview of that study.

  9. Space Shuttle Projects

    NASA Image and Video Library

    1988-10-26

    The STS-27 crew portrait features 5 astronauts. Seated, left to right, are Jerry L. Ross, mission specialist; Guy S. Gardner, pilot; and Robert L. Gibson, commander. On the back row, left to right, are mission specialists Richard M. Mullane, and William M. Shepherd. Launched aboard the Space Shuttle Atlantis on December 2, 1988 at 9:30:34 am (EST), the STS-27 mission was the third mission dedicated to the Department of Defense (DOD).

  10. Space Shuttle Projects

    NASA Image and Video Library

    1992-09-01

    The STS-53 crew portrait included astronauts (front left to right): Guion S. Bluford, and James S. Voss, mission specialists. On the back row, left to right, are David M. Walker, commander; Robert D. Cabana, Pilot; and Michael R. (Rick) Clifford, mission specialist. The crew launched aboard the Space Shuttle Discovery on December 2, 1992 at 8:24:00 am (EST). This mission marked the final classified shuttle flight for the Department of Defense (DOD).

  11. Space Shuttle Projects

    NASA Image and Video Library

    1990-02-14

    The STS-36 crew portrait features 5 astronauts who served in the 6th Department of Defense (DOD) mission. Posed near the Space Shuttle Orbiter Discovery are (left to right) Pierre J. Thuot, mission specialist 3; John H. Caster, pilot; John H. Creighton, commander; Richard M. (Mike) Mullane, mission specialist 1; and David. C. Hilmers, mission specialist 2. The crew launched aboard Atlantis on February 28, 1990 at 2:50:22am (EST).

  12. Using Model Based Systems Engineering and the Systems Modeling Language to Develop Space Mission Area Architectures

    DTIC Science & Technology

    2013-09-01

    processes used in space system acquisitions, simply implementing a data exchange specification would not fundamentally improve how information is...instruction, searching existing data sources , gathering and maintaining the data needed, and completing and reviewing the collection of information ...and manage the configuration of all critical program models, processes , and tools used throughout the DoD. Second, mandate a data exchange

  13. Thermo-electrochemical analysis of lithium ion batteries for space applications using Thermal Desktop

    NASA Astrophysics Data System (ADS)

    Walker, W.; Ardebili, H.

    2014-12-01

    Lithium-ion batteries (LIBs) are replacing the Nickel-Hydrogen batteries used on the International Space Station (ISS). Knowing that LIB efficiency and survivability are greatly influenced by temperature, this study focuses on the thermo-electrochemical analysis of LIBs in space orbit. Current finite element modeling software allows for advanced simulation of the thermo-electrochemical processes; however the heat transfer simulation capabilities of said software suites do not allow for the extreme complexities of orbital-space environments like those experienced by the ISS. In this study, we have coupled the existing thermo-electrochemical models representing heat generation in LIBs during discharge cycles with specialized orbital-thermal software, Thermal Desktop (TD). Our model's parameters were obtained from a previous thermo-electrochemical model of a 185 Amp-Hour (Ah) LIB with 1-3 C (C) discharge cycles for both forced and natural convection environments at 300 K. Our TD model successfully simulates the temperature vs. depth-of-discharge (DOD) profiles and temperature ranges for all discharge and convection variations with minimal deviation through the programming of FORTRAN logic representing each variable as a function of relationship to DOD. Multiple parametrics were considered in a second and third set of cases whose results display vital data in advancing our understanding of accurate thermal modeling of LIBs.

  14. United States Department of Defense: Agency Financial Report Fiscal Year 2014

    DTIC Science & Technology

    2014-01-01

    Defense Review (QDR) 2014 to Congress in March 2014. The QDR is a legislatively -mandated report, issued every four years, that evaluates the...Operational Test & Evaluation General Counsel, DoD ASD ( Legislative Affairs) ATSD (Public Affairs) DoD Chief Information Officer Director, Net...in Billions Breakout Accounts Payable $19.8 1% Military Retirement and Employment Benefits $2,334.0 95% Environmental and Disposal Liabilities

  15. Perry Johnson Laboratory Accreditation, Inc. (PJLA)

    DTIC Science & Technology

    2011-03-28

    Accreditation Body, established in 1999, located in Troy, Michigan • Current Accreditation Programs– ISO / IEC 17025 :2005 and DoD ELAP, EPA NLLAP...Upcoming Accreditation Programs–Field Site Sampling & Measurement Organizations (FSMO)–TNI Volume 1 and 2, Reference Material Producers– ISO Guide...Testing/Calibration – 17025 -Testing–120 – 17025 -Calibration–191 – 17025 & DoD ELAP–14 (5 Pending) – 17025 and EPA NLLAP–1 – Pending

  16. Major weapon system environmental life-cycle cost estimating for Conservation, Cleanup, Compliance and Pollution Prevention (C3P2)

    NASA Technical Reports Server (NTRS)

    Hammond, Wesley; Thurston, Marland; Hood, Christopher

    1995-01-01

    The Titan 4 Space Launch Vehicle Program is one of many major weapon system programs that have modified acquisition plans and operational procedures to meet new, stringent environmental rules and regulations. The Environmental Protection Agency (EPA) and the Department of Defense (DOD) mandate to reduce the use of ozone depleting chemicals (ODC's) is just one of the regulatory changes that has affected the program. In the last few years, public environmental awareness, coupled with stricter environmental regulations, has created the need for DOD to produce environmental life-cycle cost estimates (ELCCE) for every major weapon system acquisition program. The environmental impact of the weapon system must be assessed and budgeted, considering all costs, from cradle to grave. The Office of the Secretary of Defense (OSD) has proposed that organizations consider Conservation, Cleanup, Compliance and Pollution Prevention (C(sup 3)P(sup 2)) issues associated with each acquisition program to assess life-cycle impacts and costs. The Air Force selected the Titan 4 system as the pilot program for estimating life-cycle environmental costs. The estimating task required participants to develop an ELCCE methodology, collect data to test the methodology and produce a credible cost estimate within the DOD C(sup 3)P(sup 2) definition. The estimating methodology included using the Program Office weapon system description and work breakdown structure together with operational site and manufacturing plant visits to identify environmental cost drivers. The results of the Titan IV ELCCE process are discussed and expanded to demonstrate how they can be applied to satisfy any life-cycle environmental cost estimating requirement.

  17. 32 CFR 842.83 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Definitions. 842.83 Section 842.83 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE CLAIMS AND LITIGATION ADMINISTRATIVE... space for commerical ocean transportation of DOD cargo, mail, and personnel is an admiralty contract. (b...

  18. Department of Defense / General Services Administration / National Aeronautics and Space...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ....regulations.gov . FOR FURTHER INFORMATION CONTACT: Hada Flowers, Supervisor, Regulatory Secretariat Branch... Flexibility Analysis Required: Yes Agency Contact: Hada Flowers, Supervisor, Regulatory Secretariat, DOD/ GSA... Email: hada.flowers@gsa.gov RIN: 9000-AK92 301. FAR CASE 2006-005, HUBZONE PROGRAM REVISIONS Legal...

  19. 75 FR 6669 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ...' Purchasing Systems Reviews AGENCIES: Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for public comments... collection requirement concerning contractors' purchasing systems reviews. A request for public comments was...

  20. 14 CFR 1274.213 - Distribution of cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Distribution of cooperative agreements... COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Pre-Award Requirements § 1274.213 Distribution of cooperative... functions are delegated to DOD or another agency), NASA Center for Aerospace Information (CASI), Attn...

  1. Topics in Mitigating Radar Bias

    DTIC Science & Technology

    2012-01-01

    LABORATORY SPACE VEHICLES DIRECTORATE AFRL/VSSV 3550 ABERDEEN AVE SE KIRTLAND AFB NM 87117 NON-DOD ACTIVITIES (CONUS) ALI T ALOUANI 1/1 PROFESSOR...ELECTRICAL AND COMPUTER ENGINEERING DEPARTMENT TENNESSEE TECHNOLOGICAL UNIVERSITY BOX 5004 COOKEVILLE TN 38505 Copies Paper/CD YAAKOV BAR- SHALOM 1/1 BOARD OF

  2. System model development for nuclear thermal propulsion

    NASA Technical Reports Server (NTRS)

    Walton, James T.; Hannan, Nelson A.; Perkins, Ken R.; Buksa, John H.; Worley, Brian A.; Dobranich, Dean

    1992-01-01

    A critical enabling technology in the evolutionary development of nuclear thermal propulsion (NTP) is the ability to predict the system performance under a variety of operating conditions. This is crucial for mission analysis and for control subsystem testing as well as for the modeling of various failure modes. Performance must be accurately predicted during steady-state and transient operation, including startup, shutdown, and post operation cooling. The development and application of verified and validated system models has the potential to reduce the design, testing, and cost and time required for the technology to reach flight-ready status. Since Oct. 1991, the U.S. Department of Energy (DOE), Department of Defense (DOD), and NASA have initiated critical technology development efforts for NTP systems to be used on Space Exploration Initiative (SEI) missions to the Moon and Mars. This paper presents the strategy and progress of an interagency NASA/DOE/DOD team for NTP system modeling. It is the intent of the interagency team to develop several levels of computer programs to simulate various NTP systems. The first level will provide rapid, parameterized calculations of overall system performance. Succeeding computer programs will provide analysis of each component in sufficient detail to guide the design teams and experimental efforts. The computer programs will allow simulation of the entire system to allow prediction of the integrated performance. An interagency team was formed for this task to use the best capabilities available and to assure appropriate peer review.

  3. Results of the Advanced Space Structures Technology Research Experiments (ASTREX) hardware and control development

    NASA Technical Reports Server (NTRS)

    Cossey, Derek F.

    1993-01-01

    Future DOD, NASA, and SDI space systems will be larger than any spacecraft flown before. The economics of placing these Precision Space Systems (PSS) into orbit dictates that they be as low in mass as possible. This stringent weight reduction creates structural flexibility causing severe technical problems when combined with the precise shape and pointing requirements associated with many future PSS missions. Development of new Control Structure Interaction (CSI) technologies which can solve these problems and enable future space missions is being conducted at the Phillips Laboratory, On-Location Site, CA.

  4. Patterns of Food Utilization in the DOD. Volume 2

    DTIC Science & Technology

    1975-05-01

    DOD .on .213 81.540 ROLLS faROWN/SERVE DOD .014 .213 81.752 COOKIES VANILLA WAFER DOD .014 .210 81.963 SWEET DOUGH MIX DOD .014 .209 82.172 PEACHES...ROASTED COOKIE MIX OATiEAL SERVICE USACVRATION DOD .0C2 DOD .003 DOD .00307 DOD .00002 DOD .008 DOD .001 DO" .005 POD .0004 DOD .002 DOD .001...M.,lin.mtm^.,m,mtff»m. -~——-^.-P-~—~ iwmmm^* m u ITEM COOKIES V’MILL» WAFER CCRN BREAD MIX CORN CHIPS CORN CREAM STYLE CND CORK

  5. Common View Time Transfer Using Worldwide GPS and DMA Monitor Stations

    NASA Technical Reports Server (NTRS)

    Reid, Wilson G.; McCaskill, Thomas B.; Oaks, Orville J.; Buisson, James A.; Warren, Hugh E.

    1996-01-01

    Analysis of the on-orbit Navstar clocks and the Global Positioning System (GPS) monitor station reference clocks is performed by the Naval Research Laboratory using both broadcast and postprocessed precise ephemerides. The precise ephemerides are produced by the Defense Mapping Agency (DMA) for each of the GPS space vehicles from pseudo-range measurements collected at five GPS and at five DMA monitor stations spaced around the world. Recently, DMA established an additional site co-located with the US Naval Observatory precise time site. The time reference for the new DMA site is the DoD Master Clock. Now, for the first time, it is possible to transfer time every 15 minutes via common view from the DoD Master Clock to the 11 GPS and DMA monitor stations. The estimated precision of a single common-view time transfer measurement taken over a 15-minute interval was between 1.4 and 2.7 nanoseconds. Using the measurements from all Navstar space vehicles in common view during the 15-minute interval, typically 3-7 space vehicles, improved the estimate of the precision to between 0.65 and 1.13 nanoseconds. The mean phase error obtained from closure of the time transfer around the world using the 11 monitor stations and the 25 space vehicle clocks over a period of 4 months had a magnitude of 31 picoseconds. Analysis of the low noise time transfer from the DoD Master Clock to each of the monitor stations yields not only the bias in the time of the reference clock, but also focuses attention on structure in the behaviour of the reference clock not previously seen. Furthermore, the time transfer provides a a uniformly sampled database of 15-minute measurements that make possible, for the first time, the direct and exhaustive computation of the frequency stability of the monitor station reference clocks. To lend perspective to the analysis, a summary is given of the discontinuities in phase and frequency that occurred in the reference clock at the Master Control Station during the period covered by the analysis.

  6. Virtual Mission Operations Center -Explicit Access to Small Satellites by a Net Enabled User Base

    NASA Astrophysics Data System (ADS)

    Miller, E.; Medina, O.; Paulsen, P.; Hopkins, J.; Long, C.; Holloman, K.

    2008-08-01

    The Office of Naval Research (ON R), The Office of the Secr etary of Defense (OSD) , Th e Operationally Responsive Space Off ice (ORS) , and th e National Aeronautics and Space Administration (NASA) are funding the development and integration of key technologies and new processes that w ill allow users across th e bread th of operations the ab ility to access, task , retr ieve, and collaborate w ith data from various sensors including small satellites v ia the Intern et and the SIPRnet. The V irtual Mission Oper ations Center (VMO C) facilitates the dynamic apportionmen t of space assets, allows scalable mission man agement of mu ltiple types of sensors, and provid es access for non-space savvy users through an intu itive collaborative w eb site. These key technologies are b eing used as experimentation pathfinders fo r th e Do D's Operationally Responsiv e Sp ace (O RS) initiative and NASA's Sensor W eb. The O RS initiative seeks to provide space assets that can b e rapid ly tailored to meet a commander's in telligen ce or commun ication needs. For the DoD and NASA the V MO C provid es ready and scalab le access to space b ased assets. To the commercial space sector the V MO C may provide an analog to the innovativ e fractional ownersh ip approach represen ted by FlexJet. This pap er delves in to the technology, in tegration, and applicability of th e V MO C to th e DoD , NASA , and co mmer cial sectors.

  7. Ensuring US National Aeronautics Test Capabilities

    NASA Technical Reports Server (NTRS)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD). However, changes in the Aerospace landscape, primarily the decrease in demand for testing over the last 20 years required an overarching strategy for management of these national assets. Therefore, NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD. Test facility utilization is a critical factor for ATP because it relies on user occupancy fees to recover a substantial part of the operations costs for its facilities. Decreasing utilization is an indicator of excess capacity and in some cases low-risk redundancy (i.e., several facilities with basically the same capability and overall low utilization). However, low utilization does not necessarily translate to lack of strategic importance. Some facilities with relatively low utilization are nonetheless vitally important because of the unique nature of the capability and the foreseeable aeronautics testing needs. Unfortunately, since its inception, the customer base for ATP has continued to shrink. Utilization of ATP wind tunnels has declined by more than 50% from the FY 2006 levels. This significant decrease in customer usage is attributable to several factors, including the overall decline in new programs and projects in the aerospace sector; the impact of computational fluid dynamics (CFD) on the design, development, and research process; and the reductions in wind tunnel testing requirements within the largest consumer of ATP wind tunnel test time, the Aeronautics Research Mission Directorate (ARMD). Retirement of the Space Shuttle Program and recent perturbations of NASA's Constellation Program will exacerbate this downward trend. Therefore it is crucial that ATP periodically revisit and determine which of its test capabilities are strategically important, which qualify as low-risk redundancies that could be put in an inactive status or closed, and address the challenges associated with both sustainment and improvements to the test capabilities that must remain active. This presentation will provide an overview of the ATP vision, mission, and goals as well as the challenges and opportunities the program is facing both today and in the future. We will discuss the strategy ATP is taking over the next five years to address the National aeronautics test capability challenges and what the program will do to capitalize on its opportunities to ensure a ready, robust and relevant portfolio of National aeronautics test capabilities.

  8. Space Shuttle Projects

    NASA Image and Video Library

    1985-09-08

    The crew assigned to the STS-51J mission included (seated left to right) Robert L. Stewart, mission specialist; Karol J. Bobko, commander; and Ronald J. Grabe, pilot. On the back row, left to right, are mission specialists David C. Hilmers, and Major Willliam A, Pailles (USAF). Launched aboard the Space Shuttle Atlantis on October 3, 1985 at 11:15:30 am (EDT), the STS-51J mission was the second mission dedicated to the Department of Defense (DOD).

  9. STS-53 Discovery, Orbiter Vehicle (OV) 103, rises into sky after KSC liftoff

    NASA Image and Video Library

    1992-12-02

    STS053-S-058 (2 Dec. 1992) --- The space shuttle Discovery, with a crew of five astronauts onboard, launches from Kennedy Space Center's (KSC) Pad 39A at 8:24:00 a.m. (EST), Dec. 2, 1992. The all military crew supporting the Department of Defense (DOD) flight included astronauts David M. Walker, Robert D. Cabana, Guion S. Bluford, Jr., James S. Voss and Michael R. U. (Rich) Clifford.

  10. Space Shuttle Projects

    NASA Image and Video Library

    1990-07-08

    The official STS-38 crew portrait includes the following 5 astronauts (front left to right): Frank L. Culbertson, pilot; and Richard O. Covey, commander. Standing (left to right) are mission specialists (MS) Charles D. (Sam) Gemar, (MS-3), Robert C. Springer, (MS-1), and Carl J. Meade, (MS-2). The seventh mission dedicated to the Department of Defense (DOD), the STS-38 crew launched aboard the Space Shuttle Atlantis on November 15, 1990 at 6:48:15 pm (EST).

  11. Space Shuttle Projects

    NASA Image and Video Library

    1985-01-08

    The crew assigned to the STS-51C mission included (kneeling in front left to right) Loren J. Schriver, pilot; and Thomas K. Mattingly, II, commander. Standing, left to right, are Gary E. Payton, payload specialist; and mission specialists James F. Buchli, and Ellison L. Onzuka. Launched aboard the Space Shuttle Discovery on January 24, 1985 at 2:50:00 pm (EST), the STS-51C was the first mission dedicated to the Department of Defense (DOD).

  12. Battery model for electrical power system energy balance

    NASA Technical Reports Server (NTRS)

    Hafen, D. P.

    1983-01-01

    A model to simulate nickel-cadmium battery performance and response in a spacecraft electrical power system energy balance calculation was developed. The voltage of the battery is given as a function of temperature, operating depth-of-charge (DOD), and battery state-of-charge. Also accounted for is charge inefficiency. A battery is modeled by analysis of the results of a multiparameter battery cycling test at various temperatures and DOD's.

  13. DFAS Needs More Effective Controls Over Managing DoD Contractor Debt

    DTIC Science & Technology

    2011-07-15

    Acrobat fil e onl y) to audc lev@dod ig.m il. Copies of management comments must have the actual signature of the authori zing official for yo ur...Attribute Testing Results 18 E. Sampling Methodology 20 Glossary of Technical Terms 21 Management...Bill of Collection number to each contractor debt as a debt management tool. CDS allows users to prepare a demand letter from the database, post

  14. DoD Comprehensive Military Unmanned Aerial Vehicle Smart Device Ground Control Station Threat Model

    DTIC Science & Technology

    2015-04-01

    design , imple- mentation, and test evaluation were interviewed to evaluate the existing gaps in the DoD processes for cybersecurity. This group exposed...such as antenna design and signal reception have made satellite communication networks a viable solution for smart devices on the battlefield...DoD Comprehensive Military Unmanned AERIAL VEHICLE SMART DEVICE GROUND CONTROL STATION THREAT MODEL  Image designed by Diane Fleischer Report

  15. Waste-to-Energy: Hawaii and Guam Energy Improvement Technology Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, J.; Gelman, R.; Tomberlin, G.

    2014-03-01

    The National Renewable Energy Laboratory (NREL) and the U.S. Navy have worked together to demonstrate new or leading-edge commercial energy technologies whose deployment will support the U.S. Department of Defense (DOD) in meeting its energy efficiency and renewable energy goals while enhancing installation energy security. This is consistent with the 2010 Quadrennial Defense Review report1 that encourages the use of 'military installations as a test bed to demonstrate and create a market for innovative energy efficiency and renewable energy technologies coming out of the private sector and DOD and Department of Energy laboratories,' as well as the July 2010 memorandummore » of understanding between DOD and the U.S. Department of Energy (DOE) that documents the intent to 'maximize DOD access to DOE technical expertise and assistance through cooperation in the deployment and pilot testing of emerging energy technologies.' As part of this joint initiative, a promising waste-to-energy (WTE) technology was selected for demonstration at the Hickam Commissary aboard the Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. The WTE technology chosen is called high-energy densification waste-to-energy conversion (HEDWEC). HEDWEC technology is the result of significant U.S. Army investment in the development of WTE technology for forward operating bases.« less

  16. 76 FR 39231 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-53; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... National Aeronautics and Space Administration 48 CFR Chapter 1 Federal Acquisition Regulation; Final Rules... ADMINISTRATION 48 CFR Chapter 1 [Docket FAR 2011-0076, Sequence 5] Federal Acquisition Regulation; Federal Acquisition Circular 2005-53; Introduction AGENCIES: Department of Defense (DoD), General Services...

  17. Autonomous System for MISSE Temperature Measurements

    NASA Technical Reports Server (NTRS)

    Harvey, G. A.; Lash, T. J.; Kinard, W. H.; Bull, K.; deGeest, F.

    2001-01-01

    The Materials International Space Station Experiment (MISSE) is scheduled to be deployed during the summer of 2001. This experiment is a cooperative endeavor by NASA-LaRC, NASA-GRC, NASA MSFC, NASA-JSC, the Materials Laboratory at the Air Force Research Laboratory, and the Boeing Phantom Works. The objective of the experiment is to evaluate performance, stability, and long term survivability of materials and components planned for use by NASA and DOD on future LEO, synchronous orbit, and interplanetary space missions. Temperature is an important parameter in the evaluation of space environmental effects on materials.

  18. Space station, 1959 to . .

    NASA Astrophysics Data System (ADS)

    Butler, G. V.

    1981-04-01

    Early space station designs are considered, taking into account Herman Oberth's first space station, the London Daily Mail Study, the first major space station design developed during the moon mission, and the Manned Orbiting Laboratory Program of DOD. Attention is given to Skylab, new space station studies, the Shuttle and Spacelab, communication satellites, solar power satellites, a 30 meter diameter radiometer for geological measurements and agricultural assessments, the mining of the moons, and questions of international cooperation. It is thought to be very probable that there will be very large space stations at some time in the future. However, for the more immediate future a step-by-step development that will start with Spacelab stations of 3-4 men is envisaged.

  19. NASA safety program activities in support of the Space Exploration Initiatives Nuclear Propulsion program

    NASA Technical Reports Server (NTRS)

    Sawyer, J. C., Jr.

    1993-01-01

    The activities of the joint NASA/DOE/DOD Nuclear Propulsion Program Technical Panels have been used as the basis for the current development of safety policies and requirements for the Space Exploration Initiatives (SEI) Nuclear Propulsion Technology development program. The Safety Division of the NASA Office of Safety and Mission Quality has initiated efforts to develop policies for the safe use of nuclear propulsion in space through involvement in the joint agency Nuclear Safety Policy Working Group (NSPWG), encouraged expansion of the initial policy development into proposed programmatic requirements, and suggested further expansion into the overall risk assessment and risk management process for the NASA Exploration Program. Similar efforts are underway within the Department of Energy to ensure the safe development and testing of nuclear propulsion systems on Earth. This paper describes the NASA safety policy related to requirements for the design of systems that may operate where Earth re-entry is a possibility. The expected plan of action is to support and oversee activities related to the technology development of nuclear propulsion in space, and support the overall safety and risk management program being developed for the NASA Exploration Program.

  20. A Common Communications, Navigation and Surveillance Infrastructure for Accommodating Space Vehicles in the Next Generation Air Transportation System

    NASA Technical Reports Server (NTRS)

    VanSuetendael, RIchard; Hayes, Alan; Birr, Richard

    2008-01-01

    Suborbital space flight and space tourism are new potential markets that could significantly impact the National Airspace System (NAS). Numerous private companies are developing space flight capabilities to capture a piece of an emerging commercial space transportation market. These entrepreneurs share a common vision that sees commercial space flight as a profitable venture. Additionally, U.S. space exploration policy and national defense will impose significant additional demands on the NAS. Air traffic service providers must allow all users fair access to limited airspace, while ensuring that the highest levels of safety, security, and efficiency are maintained. The FAA's Next Generation Air Transportation System (NextGen) will need to accommodate spacecraft transitioning to and from space through the NAS. To accomplish this, space and air traffic operations will need to be seamlessly integrated under some common communications, navigation and surveillance (CNS) infrastructure. As part of NextGen, the FAA has been developing the Automatic Dependent Surveillance Broadcast (ADS-B) which utilizes the Global Positioning System (GPS) to track and separate aircraft. Another key component of NextGen, System-Wide Information Management/ Network Enabled Operations (SWIM/NEO), is an open architecture network that will provide NAS data to various customers, system tools and applications. NASA and DoD are currently developing a space-based range (SBR) concept that also utilizes GPS, communications satellites and other CNS assets. The future SBR will have very similar utility for space operations as ADS-B and SWIM has for air traffic. Perhaps the FAA, NASA, and DoD should consider developing a common space-based CNS infrastructure to support both aviation and space transportation operations. This paper suggests specific areas of research for developing a CNS infrastructure that can accommodate spacecraft and other new types of vehicles as an integrated part of NextGen.

  1. A Preliminary Analysis of Noise Exposure and Medical Outcomes for Department of Defense Military Musicians.

    PubMed

    Smith, Cindy; Beamer, Sharon; Hall, Shane; Helfer, Thomas; Kluchinsky, Timothy A

    2015-01-01

    Noise exposure is a known occupational health hazard to those serving in the military. Previous military epidemiology studies have identified military occupations at risk of noise induced hearing loss (NIHL); however, musicians have not been specifically mentioned. The focus of military NIHL studies is usually on those service members of the combat arms occupations. This project was a preliminary examination of Department of Defense (DoD) active duty military musicians in regard to their noise exposure, annual hearing test rates, and hearing injury rates using available data sources. The analysis concluded that DoD military musicians are an underserved population in terms of hearing conservation efforts. Noise surveillance data extracted from the Defense Occupational and Environmental Health Readiness System-Industrial Hygiene showed that every musician similar exposure group (SEG) with noise survey data from 2009 to 2013 exceeded the occupation exposure level adopted by DoD Instruction 6055.12. However, only a small percentage of all DoD active duty military musicians (5.5% in the peak year of 2012) were assigned to a SEG that was actually surveyed. Hearing test data based on Current Procedural Terminology coding extracted from the Military Health System revealed that the percentage of musicians with annual hearing tests increased over the 5 years studied in all services except the Air Force. During 2013, the data showed that the Navy had the highest percentage of musicians with annual hearing tests at 70.9%, and the Air Force had the lowest at 11.4%. The Air Force had the highest percentage of hearing injuries of those musicians with annual hearing tests for all 5 years analyzed. Although noise surveillance and annual hearing tests are being conducted, they occur at a much lower rate than required for a population that is known to be overexposed to noise.

  2. Tridodecylamine, an efficient charge control agent in non-polar media for electrophoretic inks application

    NASA Astrophysics Data System (ADS)

    Noel, Amélie; Mirbel, Déborah; Cloutet, Eric; Fleury, Guillaume; Schatz, Christophe; Navarro, Christophe; Hadziioannou, Georges; CyrilBrochon

    2018-01-01

    In order to obtain efficient electrophoretic inks, Tridodecylamine (Dod3N), has been studied as charge control agent (CCA) in a non-polar paraffin solvent (Isopar G) for various inorganic pigments (TiO2 and Fe2O3). All hydrophobic mineral oxides, i.e. treated with octyltrimethoxysilane (C8) or dodecyltrimethoxysilane (C12), were found to be negatively charged in presence of Dod3N. The electrophoretic mobilities of inorganic pigments seemed to be strongly dependent of their isoelectric point (IEP) and also of the concentration of dod3N with an optimum range between 10 and 20 mM depending on the pigments. Finally, an electrophoretic ink constituted of hydrophobic mineral oxides in presence of Dod3N was tested in a device. Its efficiency as charge control agent to negatively charge hydrophobic particles was confirmed through good optical properties and fast response time (220 ms at 200 kV m-1).

  3. Space Acquisitions: GAO Assessment of DOD Responsive Launch Report

    DTIC Science & Technology

    2015-10-29

    foreign governments or industry ; 2. conditions or requirements for responsive launch that would provide the necessary military value; 3. various...Facebook, Flickr, Twitter, and YouTube. Subscribe to our RSS Feeds or E-mail Updates. Listen to our Podcasts . Visit GAO on the web at www.gao.gov

  4. 32 CFR 231.6 - Procedures-overseas banks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 231.1(a). (D) Education, on a space-available, tuition-paying basis, provided by the Department of Defense Education Activity to minor dependents of assigned staff in accordance with DoD Directive 1342.13... custodial and janitorial services to include garbage disposal and outdoor maintenance (such as grass cutting...

  5. 32 CFR 231.6 - Procedures-overseas banks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 231.1(a). (D) Education, on a space-available, tuition-paying basis, provided by the Department of Defense Education Activity to minor dependents of assigned staff in accordance with DoD Directive 1342.13... custodial and janitorial services to include garbage disposal and outdoor maintenance (such as grass cutting...

  6. 32 CFR 231.6 - Procedures-overseas banks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 231.1(a). (D) Education, on a space-available, tuition-paying basis, provided by the Department of Defense Education Activity to minor dependents of assigned staff in accordance with DoD Directive 1342.13... custodial and janitorial services to include garbage disposal and outdoor maintenance (such as grass cutting...

  7. 75 FR 9399 - Defense Health Board (DHB) Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... DEPARTMENT OF DEFENSE Office of the Secretary Defense Health Board (DHB) Meeting AGENCY... of the Defense Health Board (DHB), will meet on March 11, 2010. Subject to the availability of space... INFORMATION: Due to internal DoD difficulties, beyond the control of the Defense Health Board or its...

  8. 32 CFR 231.10 - Financial institutions on DoD installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations shall be provided logistic support as set forth in subpart A of this part. (vi) Military... financial services (to include in-store banking) requiring the outgrant of additional space or logistical... Logistics) (USD(AT&L)) shall monitor policies and procedures governing logistical support furnished to...

  9. 32 CFR 231.10 - Financial institutions on DoD installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations shall be provided logistic support as set forth in subpart A of this part. (vi) Military... financial services (to include in-store banking) requiring the outgrant of additional space or logistical... Logistics) (USD(AT&L)) shall monitor policies and procedures governing logistical support furnished to...

  10. 32 CFR 231.10 - Financial institutions on DoD installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations shall be provided logistic support as set forth in subpart A of this part. (vi) Military... financial services (to include in-store banking) requiring the outgrant of additional space or logistical... Logistics) (USD(AT&L)) shall monitor policies and procedures governing logistical support furnished to...

  11. 32 CFR Appendix B to Part 324 - System of Records Notice

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., punctuation, and spaces. 2. Security classification. Self explanatory. (DoD does not publish this caption... birth, etc.); and any description of proof of identity for verification purposes required for personal... verification. If appropriate, the individual may be referred to the system manager or another DFAS official who...

  12. Software Intensive Systems Cost and Schedule Estimation

    DTIC Science & Technology

    2013-06-13

    Radio communication systems RTE Electronic navigation systems RTE Space vehicle electronic tracking systems RTE Sonar systems RTE...MONITORING AGENCY NAME(S) AND ADDRESS(ES) DASD (SE), DoD, AIRFORCE 10. SPONSOR/MONITOR’S ACRONYM(S) 11 . SPONSOR/MONITOR’S REPORT NUMBER(S) 12... 11   3.2.2  SEER‐SEM

  13. 78 FR 60174 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-70; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Acquisition Circular 2005-70; Small Entity Compliance Guide AGENCY: Department of Defense (DoD), General... employees at subpart 3.9. In accordance with FAR 1.108(d)(3), contracting officers are encouraged to include...

  14. 78 FR 17671 - Federal Acquisition Regulation; Submission for OMB Review; Summary Subcontract Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for... for DOD and NASA) of subcontracts awarded by prime and subcontractors for a specific Federal... data from Alaskan Native Corporations and Indian Tribe concerns under a subcontracting plan with the...

  15. 76 FR 44496 - Hazardous Materials Transportation: Revisions of Special Permits Procedures; Response to Appeals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ...), the National Aeronautics and Space Administration (NASA), and the Department of Defense (DOD), and... in Executive Order 13132 (``Federalism''). This final rule would preempt state, local and Indian..., contains an express preemption provision (49 U.S.C. 5125(b)) preempting state, local and Indian tribe...

  16. 78 FR 73085 - Mission Compatibility Evaluation Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-05

    ... daily operating hours or the number of days that equipment in the proposed structure would be in use... structure, operating characteristics, or the equipment in the proposed project. (2) Changing the location of... the DoD involve proposals for the construction of structures that may affect navigable air space...

  17. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-Quarterly Reporting for Prime...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Recovery and Reinvestment Act--Quarterly Reporting for Prime Contractors AGENCY: Department of Defense (DOD... cumulative amount from all the reports submitted for this action will be maintained by the government's on...

  18. 78 FR 43205 - Federal Acquisition Regulation; Submission for OMB Review; Bankruptcy (FAR Subpart 42.9; 52.242-13)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Docket 2012-0076; Sequence 51; OMB Control No. 9000-0108] Federal Acquisition Regulation; Submission for OMB Review; Bankruptcy (FAR Subpart 42.9; 52.242-13) AGENCY: Department of Defense (DOD...

  19. 77 FR 73660 - Federal Acquisition Regulation; Information Collection; Bankruptcy (FAR subpart 42.9; 52.242-13)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Docket 2012-0076; Sequence 51; OMB Control No. 9000-0108] Federal Acquisition Regulation; Information Collection; Bankruptcy (FAR subpart 42.9; 52.242-13) AGENCY: Department of Defense (DOD), General...

  20. Development of nickel-metal hydride cell: An update

    NASA Technical Reports Server (NTRS)

    Kuwajima, S.; Kusawake, Hiroaki; Nakatani, Kensuke; Yano, Y.

    1994-01-01

    This paper presents in viewgraph format an overview of NASDA's evaluation of commercial nickel metal-hydride (Ni-MH) cells and the development and testing of Ni-MH cells for use in space. The commercial cells are concluded to be feasible and suitable for use in LEO; for GEO, the durability for overcharge is needed because long-term charge retention is required. For the aerospace Ni-MH cell design, two activation procedures are applied to evaluate the effect of the difference in the amount of overcharge protection and precharge. Specific energy of the Ni-MH cell is nearly accomplished at 50 Wh/kg. Initial characteristics indicate the effect derived from precharge. Thirty-five amp-hour class Ni-MH cells have good performance for LEO cycle of 25 and 40 percent DOD up to 3000 cycles as similar to commercial cells. The effect of the difference in the amount of overcharge protection will appear in life test.

  1. Mitigating Cyber Security Risk in Satellite Ground Systems

    DTIC Science & Technology

    2015-04-01

    because cyber security in government remains shrouded in secrecy. However, using the Defense Operational Test and Evaluation Office’s (DOT& E ) FY14...report on cybersecurity one grasps the seriousness of the problem. DOT& E reported only 85% of networks in DoD were compliant with the cyber...security regulations discussed later in this paper. Not until compliance is near 100% could DOT& E conceive with confidence that DoD networks were safe

  2. DoD Role in Counterdrug Operations - Can We Achieve Better Results?

    DTIC Science & Technology

    1999-04-01

    drug detection 34 requirement. Tests showed fully loaded containers can be effectively screened for narcotics with high energy X - ray technologies...The DOD and the U.S. Customs Service are procuring X - ray systems with higher energy level, mobile X - ray systems, and even more advanced handheld...reduction in domestic marijuana cultivation and methamphetamine production by the year 2002. Long term objectives include a 30 percent reduction in the flow

  3. Metric Use in the Tool Industry. A Status Report and a Test of Assessment Methodology.

    DTIC Science & Technology

    1982-04-20

    Weights and Measures) CIM - Computer-Integrated Manufacturing CNC - Computer Numerical Control DOD - Department of Defense DODISS - DOD Index of...numerically-controlled ( CNC ) machines that have an inch-millimeter selection switch and a corresponding dual readout scale. S -4- The use of both metric...satisfactorily met the demands of both domestic and foreign customers for metric machine tools by providing either metric- capable machines or NC and CNC

  4. Standardization of Software Application Development and Governance

    DTIC Science & Technology

    2015-03-01

    of their systems or applications. DOD systems do not have the luxury of replacing systems at the same pace as commercial companies. DOD has to...is not that the commercial market purposefully sells products that are not complete, but having a 100% complete product requires extensive testing...develop applications for Google ’s Android and Apple ’s iOS devices. Both these companies have SDKs online as well as a number of resources available

  5. KSC01kodi049

    NASA Image and Video Library

    2001-06-19

    KODIAK ISLAND, Alaska -- Orbis 21D Equipment Section Boost Motor, the second stage of the Athena 1 launch vehicle, awaits the installation of the Orbit Adjust Model (OAM), which navigates the payloads into the correct orbit, at the launch pad at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5:00 to 7:00 p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program.

  6. KSC01kodi078

    NASA Image and Video Library

    2001-09-05

    KODIAK ISLAND, ALASKA - Inside the Launch Service Structure, Kodiak Launch Complex (KLC), the final stage of the Athena I launch vehicle, with the Kodiak Star spacecraft, is maneuvered into place. The first launch to take place from KLC, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KLC is the newest commercial launch complex in the United States, ideal for launch payloads requiring low-Earth polar or sun-synchronous orbits

  7. Technology collaboration by means of an open source government

    NASA Astrophysics Data System (ADS)

    Berardi, Steven M.

    2009-05-01

    The idea of open source software originally began in the early 1980s, but it never gained widespread support until recently, largely due to the explosive growth of the Internet. Only the Internet has made this kind of concept possible, bringing together millions of software developers from around the world to pool their knowledge. The tremendous success of open source software has prompted many corporations to adopt the culture of open source and thus share information they previously held secret. The government, and specifically the Department of Defense (DoD), could also benefit from adopting an open source culture. In acquiring satellite systems, the DoD often builds walls between program offices, but installing doors between programs can promote collaboration and information sharing. This paper addresses the challenges and consequences of adopting an open source culture to facilitate technology collaboration for DoD space acquisitions. DISCLAIMER: The views presented here are the views of the author, and do not represent the views of the United States Government, United States Air Force, or the Missile Defense Agency.

  8. 32 CFR 337.2 - Ordering DoD Publications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Ordering DoD Publications. 337.2 Section 337.2... DOD INFORMATION AVAILABILITY OF DOD DIRECTIVES, DOD INSTRUCTIONS, DOD PUBLICATIONS, AND CHANGES § 337.2 Ordering DoD Publications. DoD publications and changes published in Chapter 3—Publications...

  9. 32 CFR 337.2 - Ordering DoD Publications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Ordering DoD Publications. 337.2 Section 337.2... DOD INFORMATION AVAILABILITY OF DOD DIRECTIVES, DOD INSTRUCTIONS, DOD PUBLICATIONS, AND CHANGES § 337.2 Ordering DoD Publications. DoD publications and changes published in Chapter 3—Publications...

  10. STS-27 Atlantis, OV-104, lifts off from KSC Launch Complex (LC) Pad 39B

    NASA Image and Video Library

    1988-12-02

    STS027-S-005 (Dec 2, 1988) --- Space Shuttle Atlantis is launched from Kennedy Space Center's (KSC) Pad 39-B at 9:30 a.m. EST, on a Department of Defense (DOD) dedicated mission. This is the third mission for the orbiter Atlantis. Crew members are: Commander Robert L. "Hoot" Gibson; Pilot Guy S. Gardner; and Mission Specialists Jerry L. Ross, William M. Shepherd and Richard M. (Mike) Mullane.

  11. STS-53 Discovery, Orbiter Vehicle (OV) 103, lifts off from KSC LC Pad 39A

    NASA Image and Video Library

    1992-12-02

    STS053-S-056 (2 Dec 1992) --- The Space Shuttle Discovery, with a crew of five astronauts onboard, launches from Kennedy Space Center's (KSC) Pad 39A at 8:24:00 a.m. (EST), December 2, 1992. The all military crew supporting the Department of Defense (DOD) flight included astronauts David M. Walker, Robert D. Cabana, Guion S. Bluford Jr., James S. Voss and Michael R. U. (Rick) Clifford.

  12. Cause and motivation in cases of non-fatal drug overdoses in opiate addicts.

    PubMed

    Pfab, R; Eyer, F; Jetzinger, E; Zilker, Thomas

    2006-01-01

    Drug overdose (OD) is a frequent incident among opiate addicts. Survivors of ODs are at risk for additional and eventually fatal ODs. ODs may be classified as accidental (aOD) or deliberate (dOD). Investigations into the connection between OD and suicide attempts have led to insconsistent results. (1) to determine how many non-fatal ODs were dODs and how many were aODs; (2) to determine how many cases of dODs were motivated by explicit or by ambivalent suicidal intentions; (3) to determine how many cases of aODs had causes that might respond to preventative measures; (4) to compare the addiction histories of dODs and aODs; (5) to compare the drugs causing the ODs; and (6) to compare the severity of the ODs in both groups. Prospective study utilizing a standardized questionnaire to evaluate opiate-addicted patients admitted to our treatment unit for OD. All cases underwent standardized drug testing to identify drug use patterns. Seventy-four cases of OD underwent standardized interviews after awakening. Forty-three percent of the cases were dOD. Cases of dOD had significantly more OA in substitution programs, more previous ODs, and more often consumed methadone and cocaine. Among dODs, 22.5% had suicidal intention and 9.6% were ambivalent about committing suicide; background motivations were most often conflicts with spouses. Fifty-seven percent of the cases were aOD. Cases of aODs had significantly more potential lethal intoxications and had heroin detected more frequently. aODs happened with unexpected pure heroin (46%), in combination with alcohol (36%), as relapse after abstinence (40%) or after institutionalized treatment (19%). This group should be accessible for targeted education.

  13. Fault Management Practice: A Roadmap for Improvement

    NASA Technical Reports Server (NTRS)

    Fesq, Lorraine M.; Oberhettinger, David

    2010-01-01

    Autonomous fault management (FM) is critical for deep space and planetary missions where the limited communication opportunities may prevent timely intervention by ground control. Evidence of pervasive architecture, design, and verification/validation problems with NASA FM engineering has been revealed both during technical reviews of spaceflight missions and in flight. These problems include FM design changes required late in the life-cycle, insufficient project insight into the extent of FM testing required, unexpected test results that require resolution, spacecraft operational limitations because certain functions were not tested, and in-flight anomalies and mission failures attributable to fault management. A recent NASA initiative has characterized the FM state-of-practice throughout the spacecraft development community and identified common NASA, DoD, and commercial concerns that can be addressed in the near term through the development of a FM Practitioner's Handbook and the formation of a FM Working Group. Initial efforts will focus on standardizing FM terminology, establishing engineering processes and tools, and training.

  14. Military Ecological Risk Assessment Framework (MERAF) for Assessment of Risks of Military Training and Testing to Natural Resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suter II, G.W.

    2003-06-18

    The objective of this research is to provide the DoD with a framework based on a systematic, risk-based approach to assess impacts for management of natural resources in an ecosystem context. This risk assessment framework is consistent with, but extends beyond, the EPA's ecological risk assessment framework, and specifically addresses DoD activities and management needs. MERAF is intended to be consistent with existing procedures for environmental assessment and planning with DoD testing and training. The intention is to supplement these procedures rather than creating new procedural requirements. MERAF is suitable for use for training and testing area assessment and management.more » It does not include human health risks nor does it address specific permitting or compliance requirements, although it may be useful in some of these cases. Use of MERAF fits into the National Environmental Policy Act (NEPA) process by providing a consistent and rigorous way of organizing and conducting the technical analysis for Environmental Impact Statements (EISs) (Sigal 1993; Carpenter 1995; Canter and Sadler 1997). It neither conflicts with, nor replaces, procedural requirements within the NEPA process or document management processes already in place within DoD.« less

  15. Improving proton therapy accessibility through seamless electronic integration of remote treatment planning sites.

    PubMed

    Belard, Arnaud; Dolney, Derek; Zelig, Tochner; McDonough, James; O'Connell, John

    2011-06-01

    Proton radiotherapy is a relatively scarce treatment modality in radiation oncology, with only nine centers currently operating in the United States. Funded by Public Law 107-248, the University of Pennsylvania and the Walter Reed Army Medical Center have developed a remote proton radiation therapy solution with the goals of improving access to proton radiation therapy for Department of Defense (DoD) beneficiaries while minimizing treatment delays and time spent away from home/work (time savings of up to 3 weeks per patient). To meet both Health Insurance Portability and Accountability Act guidelines and the more stringent security restrictions imposed by the DoD, our program developed a hybrid remote proton radiation therapy solution merging a CITRIX server with a JITIC-certified (Joint Interoperability Test Command) desktop videoconferencing unit. This conduit, thoroughly tested over a period of 6 months, integrates both institutions' radiation oncology treatment planning infrastructures into a single entity for DoD patients' treatment planning and delivery. This telemedicine solution enables DoD radiation oncologists and medical physicists the ability to (1) remotely access a proton therapy treatment planning platform, (2) transfer patient plans securely to the University of Pennsylvania patient database, and (3) initiate ad-hoc point-to-point and multipoint videoconferences to dynamically optimize and validate treatment plans. Our robust and secure remote treatment planning solution grants DoD patients not only access to a state-of-the-art treatment modality, but also participation in the treatment planning process by Walter Reed Army Medical Center radiation oncologists and medical physicists. This telemedicine system has the potential to lead to a greater integration of military treatment facilities and/or satellite clinics into regional proton therapy centers.

  16. Operation DOMINIC II, Shots LITTLE FELLER II, JOHNIE BOY, SMALL BOY, LITTLE FELLER I, 7 July-17 July 1962. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ponton, J.; Maag, C.; Rohrer, S.

    1983-01-31

    This report describes the activities of an estimated 3,000 DOD personnel, both military and civilian, in Operation DOMINIC II, the eighth peacetime series of nuclear weapons tests, conducted in Nevada from 7 July through 17 July 1962. Activities engaging DOD personnel included the Exercise IVY FLATS troop maneuver, joint DASA and AEC scientific experiments to evaluate the effects of the nuclear devices, and air support.

  17. DoD Fuel Facilities Criteria

    DTIC Science & Technology

    2015-04-27

    Pantograph Feb-2010 UFGS 33 58 00 Leak Detection for Fueling Systems Apr-2008 UFGS 33 52 43.13 Aviation Fuel Piping Feb-2010 UFGS 33 59 00 Tightness of... Pipeline Pressure Testing Guidelines  Specifications  Questions 2 7/12/2017 3 7/12/2017 DoD Fuels Facilities Documents  Unified...UFGS)  Most in the 33 nn nn series  Associated with Standard Designs  Available on WBDG site  Coating Systems 4 7/12/2017 Pipeline

  18. Thermal management of high heat flux electronic components in space and aircraft systems, phase 1

    NASA Astrophysics Data System (ADS)

    Iversen, Arthur H.

    1991-03-01

    The objectives of this Phase 1 program were to analyze, design, construct and demonstrate the application of curved surface cooling to power devices with the goal of demonstrating greater than 200 W/sq cm chip dissipation while maintaining junction temperatures within specification. Major components of the experiment comprised the test fixture for mounting the device under test and the cooling loop equipment and instrumentation. The work conducted in this Phase 1 study was to establish the basic parameters for the design of an entire class of efficient, compact, lightweight and cost competitive power conversion/conditioning systems for space, aircraft and general DOD requirements. This has been accomplished. Chip power dissipation of greater than 400 W/sq cm was demonstrated, and a general packaging and the thermal management design has been devised to meet the above requirements. The power limit reached was dictated by the junction temperature and not power dissipation, i.e., critical heat flux. The key to the packaging design is a basic construction concept that provides low junction to fluid thermal resistance. High heat flux dissipation without low thermal resistance is useless because excessive junction temperatures will results.

  19. The NASA welding assessment program

    NASA Technical Reports Server (NTRS)

    Scott-Monck, J.; Bozek, J.

    1984-01-01

    The potential cost and performance advantages of welding was understood but ignored by solar panel manufacturers in the U.S. Although NASA, DOD and COMSAT have supported welding development efforts, soldering remains the only U.S. space qualified method for interconnecting solar cells. The reason is that no U.S. satellite prime contractor found it necessary, due to mission requirements, to abandon the space proven soldering process. It appears that the proposed NASA space station program will provide an array requirement, a 10 year operation in a low Earth orbital environment, that mandates welding. The status of welding technology in the U.S. is assessed.

  20. Optical Communications in Support of Science from the Moon, Mars, and Beyond

    NASA Technical Reports Server (NTRS)

    Edwards, Bernard L.

    2005-01-01

    Optical communications can provide high speed communications throughout the solar system. Enable new science missions and human exploration. The technology suitable for near-earth optical communications, including communications to and from the Moon, is different than for deep space optical. NASA could leverage DoD investments for near-earth applications, including the moon. NASA will have to develop its own technology for deep space. The Mars laser communication demonstration is a pathfinder. NASA,s science mission directorate, under the leadership of Dr. Barry Geldzahler, is developing a roadmap for the development of deep space optical communications.

  1. Evolution of a standard microprocessor-based space computer

    NASA Technical Reports Server (NTRS)

    Fernandez, M.

    1980-01-01

    An existing in inventory computer hardware/software package (B-1 RFS/ECM) was repackaged and applied to multiple missile/space programs. Concurrent with the application efforts, low risk modifications were made to the computer from program to program to take advantage of newer, advanced technology and to meet increasingly more demanding requirements (computational and memory capabilities, longer life, and fault tolerant autonomy). It is concluded that microprocessors hold promise in a number of critical areas for future space computer applications. However, the benefits of the DoD VHSIC Program are required and the old proliferation problem must be revised.

  2. Ocean observer study: A proposed national asset to augment the future U.S. operational satellite system

    USGS Publications Warehouse

    Cunningham, J.D.; Chambers, D.; Davis, C.O.; Gerber, A.; Helz, R.; McGuire, J.P.; Pichel, W.

    2003-01-01

    The next generation of U.S. polar orbiting environmental satellites, are now under development. These satellites, jointly developed by the Department of Defense (DoD), the Department of Commerce (DOC), and the National Aeronautics and Space Administration (NASA), will be known as the National Polar-orbiting Operational Environmental Satellite System (NPOESS). It is expected that the first of these satellites will be launched in 2010. NPOESS has been designed to meet the operational needs of the U.S. civilian meteorological, environmental, climatic, and space environmental remote sensing programs, and the Global Military Space and Geophysical Environmental remote sewing programs. This system, however, did not meet all the needs of the user community interested in operational oceanography (particularly in coastal regions). Beginning in the fall of 2000, the Integrated Program Office (IPO), a joint DoD, DOC, and NASA office responsible for the NPOESS development, initiated the Ocean Observer Study (OOS). The purpose of this study was to assess and recommend how best to measure the missing or inadequately sampled ocean parameters. This paper summarizes the ocean measurement requirements documented in the OOS, describes the national need to measure these parameters, and describes the satellite instrumentation required to make those measurements.

  3. NASA/DOD (National Aeronautics and Space Administration/Department of Defense) Control/Structures Interaction Technology Conference (2nd) Held in Colorado Springs, Colorado on 17-19 November 1987.

    DTIC Science & Technology

    1988-06-01

    James McKelvy and Harold Tinsley *," . CONCEPTUAL DESIGN OF A SPACE STATION DYNAMIC SCALE MODEL ............. 87 Robert Letchworth, Paul E... CONCEPTUAL SYSTEM DESIGN FOR ANTENNA THERMAL AND DYNAMIC DISTORTION COMPENSATION USING A PHASED ARRAY FEED ................... 145 G. R. Sharp, R. J...to achieve somne desired state or trajectory. For conceptual purposes, however, an alternate view is useful in which the measurement reference against

  4. Crewmembers in the aft flight deck.

    NASA Image and Video Library

    1992-12-09

    STS053-01-034 (2-9 Dec 1992) --- From the Space Shuttle Discovery's aft flight deck, astronaut Guion S. Bluford, mission specialist, uses a handheld 70mm Hasselblad to photograph a point on Earth. Bluford was joined by four other NASA astronauts for the eight-day mission in Earth-orbit, dedicated to the Department of Defense (DOD).

  5. 75 FR 34279 - Federal Acquisition Regulation; FAR Case 2009-011, American Recovery and Reinvestment Act of 2009...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ..., Sequence 1] RIN 9000-AL20 Federal Acquisition Regulation; FAR Case 2009-011, American Recovery and Reinvestment Act of 2009 (Recovery Act)--GAO/IG Access AGENCIES: Department of Defense (DoD), General Services... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE...

  6. Demonstration of ISCO Treatment of a DNAPL Source Zone at Launch Complex 34 in Cape Canaveral Air Station, FL

    EPA Science Inventory

    The Interagency DNAPL Consortium (IDC) was formally established in 1999 by the U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (U.S. EPA), Department of Defense (DoD), and National Aeronautics and Space Administration as a vehicle for marshalling the resourc...

  7. 77 FR 204 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION... Governmentwide Policy. Therefore, DoD, GSA, and NASA amend 48 CFR parts 4, 8, 15, 19, 22, 23, 28, 42, and 52 as... removing from paragraph (a)(2) ``http:// www.epa.gov/epaoswer/non-hw/procure/backgrnd.htm'' and adding...

  8. 76 FR 68043 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ...), and National Aeronautics and Space Administration (NASA). ACTION: Final rule. SUMMARY: This document... Acquisition Policy, Office of Governmentwide Policy. Therefore, DoD, GSA, and NASA amend 48 CFR parts 1 and 8...] 0 4. Amend section 8.501 by removing ``http://www.nm.blm.gov/www/amfo/ amfo_home.html'' and adding...

  9. 78 FR 55244 - Notice of Availability of Record of Decision for Medical Facilities Development and University...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... AGENCY: Department of the Navy, DoD. ACTION: Notice. SUMMARY: The United States Department of the Navy... alternative for the University Expansion will provide adequate education and research space to meet Military Health System commitments to deliver training and post-graduate level education to the military medical...

  10. 32 CFR 337.2 - Ordering DoD Publications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sources are listed at the beginning of chapter 3. A fee will be charged for DoD Publications ordered from... 32 National Defense 2 2010-07-01 2010-07-01 false Ordering DoD Publications. 337.2 Section 337.2... DOD INFORMATION AVAILABILITY OF DOD DIRECTIVES, DOD INSTRUCTIONS, DOD PUBLICATIONS, AND CHANGES § 337...

  11. The Ensemble Space Weather Modeling System (eSWMS): Status, Capabilities and Challenges

    NASA Astrophysics Data System (ADS)

    Fry, C. D.; Eccles, J. V.; Reich, J. P.

    2010-12-01

    Marking a milestone in space weather forecasting, the Space Weather Modeling System (SWMS) successfully completed validation testing in advance of operational testing at Air Force Weather Agency’s primary space weather production center. This is the first coupling of stand-alone, physics-based space weather models that are currently in operations at AFWA supporting the warfighter. Significant development effort went into ensuring the component models were portable and scalable while maintaining consistent results across diverse high performance computing platforms. Coupling was accomplished under the Earth System Modeling Framework (ESMF). The coupled space weather models are the Hakamada-Akasofu-Fry version 2 (HAFv2) solar wind model and GAIM1, the ionospheric forecast component of the Global Assimilation of Ionospheric Measurements (GAIM) model. The SWMS was developed by team members from AFWA, Explorations Physics International, Inc. (EXPI) and Space Environment Corporation (SEC). The successful development of the SWMS provides new capabilities beyond enabling extended lead-time, data-driven ionospheric forecasts. These include ingesting diverse data sets at higher resolution, incorporating denser computational grids at finer time steps, and performing probability-based ensemble forecasts. Work of the SWMS development team now focuses on implementing the ensemble-based probability forecast capability by feeding multiple scenarios of 5 days of solar wind forecasts to the GAIM1 model based on the variation of the input fields to the HAFv2 model. The ensemble SWMS (eSWMS) will provide the most-likely space weather scenario with uncertainty estimates for important forecast fields. The eSWMS will allow DoD mission planners to consider the effects of space weather on their systems with more advance warning than is currently possible. The payoff is enhanced, tailored support to the warfighter with improved capabilities, such as point-to-point HF propagation forecasts, single-frequency GPS error corrections, and high cadence, high-resolution Space Situational Awareness (SSA) products. We present the current status of eSWMS, its capabilities, limitations and path of transition to operational use.

  12. Battleplan for an Unqualified Opinion: How Does the DoD FM Certification Program Help Fix the DoD’s Audit Problem

    DTIC Science & Technology

    2016-02-29

    test based certifications to determine if the program enhances the knowledge of the FM workforce and improves financial reporting . This paper found... financial reporting for the federal government.9 This step was extremely important in that it put an emphasis on improving the current state of financial ...likely new to the career field and would not require as in depth knowledge of financial management. Level two is more the intermediate and journeyman

  13. Nickel-hydrogen cell low-Earth life test update

    NASA Technical Reports Server (NTRS)

    Frate, David T.

    1991-01-01

    When individual pressure vessel (IPV) nickel-hydrogen (Ni/H2) cells were selected as the energy storage system for the Space Station Freedom in March of 1986, a limited database existed on life and performance characteristics of these cells in a low earth orbit (LEO) regime. Therefore, NASA LeRC initiated a Ni/H2 cell test program with the primary objectives of building a test facility, procuring cells from existing NASA contracts, and screening several cell designs by life testing in a LEO 35 percent depth of discharge (DOD) scenario. A total of 40 cells incorporating 13 designs were purchased from Yardney, Hughes, and Eagle-Picher. Thirty-two of the cells purchased were 65 A-hr nameplate capacity and eight cells were 50 A-hr. Yardney and Eagle-Picher cells were built with both the Air Force recirculating and the advanced back-to-back electrode stack configurations and incorporated 31 and 26 percent KOH. Acceptance testing of the first delivered cells began in March of 1988, with life testing following in September of that year.Performance comparisons of these cells are made here while specifically addressing life test data relative to the design differences.

  14. Nickel-hydrogen cell low-earth-orbit life test update

    NASA Technical Reports Server (NTRS)

    Frate, David T.

    1991-01-01

    When individual pressure vessel (IPV) nickel-hydrogen (Ni/H2) cells were selected as the energy storage system for Space Station Freedom in March of 1986, a limited database existed on life and performance characteristics of these cells in a low earth orbit (LEO) regime. Therefore, NASA LeRC initiated a Ni/H2 cell test program with the primary objectives of building a test facility, procuring cells from existing NASA contracts, and screening several cell designs by life testing in a LEO 35 percent depth of discharge (DOD) scenario. A total of 40 cells incorporating 13 designs were purchased from Yardney, Hughes, and Eagle-Picher. Thirty-two of the cells purchased were 65 A-hr nameplate capacity and eight cells were 50 A-Hr. Yardney and Eagle-Picher cells were built with both the Air Force recirculating and the advanced back-to-back electrode stack configurations and incorporated 31 and 26 percent KOH. Acceptance testing of the first delivered cells began in March of 1988, with life testing following in September of that year. Performance comparisons of these cells are made here while specifically addressing life test data relative to the design differences.

  15. Mobile robot knowledge base

    NASA Astrophysics Data System (ADS)

    Heath Pastore, Tracy; Barnes, Mitchell; Hallman, Rory

    2005-05-01

    Robot technology is developing at a rapid rate for both commercial and Department of Defense (DOD) applications. As a result, the task of managing both technology and experience information is growing. In the not-to-distant past, tracking development efforts of robot platforms, subsystems and components was not too difficult, expensive, or time consuming. To do the same today is a significant undertaking. The Mobile Robot Knowledge Base (MRKB) provides the robotics community with a web-accessible, centralized resource for sharing information, experience, and technology to more efficiently and effectively meet the needs of the robot system user. The resource includes searchable information on robot components, subsystems, mission payloads, platforms, and DOD robotics programs. In addition, the MRKB website provides a forum for technology and information transfer within the DOD robotics community and an interface for the Robotic Systems Pool (RSP). The RSP manages a collection of small teleoperated and semi-autonomous robotic platforms, available for loan to DOD and other qualified entities. The objective is to put robots in the hands of users and use the test data and fielding experience to improve robot systems.

  16. NASA TEERM Hexavalent Chrome Alternatives Projects

    NASA Technical Reports Server (NTRS)

    Rothgeb, Matt

    2009-01-01

    This slide presentation reviews the NASA/DOD projects to select an alternative to hexavalent chrome in the aerospace industry. The Phase I process of the project performed: (1) Evaluation and testing of non-chromated coating systems as replacements for hexavalent chrome coatings in aircraft and aerospace applications. (2) Testing of coating systems to DoD and NASA specifications for corrosion resistance and adhesion. (3) Bare corrosion resistance and atmospheric exposure will be focus areas of Phase II Testing. The description includes a chart that summarizes the 3000 hour salt fog test results. The second phase of the project includes (1) Evaluation and testing of coating systems that do not contain hexavalent chrome as replacements for aerospace applications. (2) Evaluation of coatings at Beach Test Site and Launch Complex 39B (3) Evaluation of non-chrome coatings for electronic housings (bare corrosion resistance and electrical impedance) is a part of this round of testing. This project was performed for the Technology Evaluation for Environmental Risk Mitigation (TEERM)

  17. Telemental health for our soldiers: a brief review and a new pilot program.

    PubMed

    Nieves, J Edwin; Candelario, Joseph; Short, Delmar; Briscoe, Gregory

    2009-12-01

    This small but significant telemental health clinical pilot could easily serve as a "best practice" model for resource utilization between the nation's VHA/DOD institutions that wish to form partnerships and capitalize on resources. It demonstrates several potential areas of collaboration for TMH projects. For example, this study also points out requisite preparation needs, e.g., an information technology (IT) needs assessment, and gap analysis between neighboring VHA/DOD installations should be considered beforehand. This would address equipment compatibility and address protected health information privacy concerns. This preparation would also lead to savings by avoiding equipment redundancy and minimize infrastructure (space) investment. While in this instance the equipment proved compatible, that may not always be the case. Second, regional strategic mapping of staff and services between institutions could help in specialty service utilization. This would improve recourse allocation, trim numerous costs, and avoid service duplication. A third area of collaboration would be the creation of a DOD/VHA electronic credentialing packet. This would simplify the preparation phase for TMH delivery and expand the availability of scarce medical specialty consultants for both the VHA and DOD. This would serve to streamline medical care and expedite the deployment of "virtual" practitioners in the event of a national disaster or emergency. To date there have not been any technical difficulties at either site and PC-PTSD-positive soldiers continue to be evaluated at the SVMAC. Anecdotal reports from both clinicians and patients are that they are highly satisfied with TMH delivery services.

  18. National facilities study. Volume 3: Mission and requirements model report

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The National Facility Study (NFS) was initiated in 1992 by Daniel S. Goldin, Administrator of NASA as an initiative to develop a comprehensive and integrated long-term plan for future facilities. The resulting, multi-agency NFS consisted of three Task Groups: Aeronautics, Space Operations, and Space Research and Development (R&D) Task Groups. A fourth group, the Engineering and Cost Analysis Task Group, was subsequently added to provide cross-cutting functions, such as assuring consistency in developing an inventory of space facilities. Space facilities decisions require an assessment of current and future needs. Therefore, the two task groups dealing with space developed a consistent model of future space mission programs, operations and R&D. The model is a middle ground baseline constructed for NFS analytical purposes with excursions to cover potential space program strategies. The model includes three major sectors: DOD, civilian government, and commercial space. The model spans the next 30 years because of the long lead times associated with facilities development and usage. This document, Volume 3 of the final NFS report, is organized along the following lines: Executive Summary -- provides a summary view of the 30-year mission forecast and requirements baseline, an overview of excursions from that baseline that were studied, and organization of the report; Introduction -- provides discussions of the methodology used in this analysis; Baseline Model -- provides the mission and requirements model baseline developed for Space Operations and Space R&D analyses; Excursions from the baseline -- reviews the details of variations or 'excursions' that were developed to test the future program projections captured in the baseline; and a Glossary of Acronyms.

  19. The National Aerospace Initiative (NAI): Technologies For Responsive Space Access

    NASA Technical Reports Server (NTRS)

    Culbertson, Andrew; Bhat, Biliyar N.

    2003-01-01

    The Secretary of Defense has set new goals for the Department of Defense (DOD) to transform our nation's military forces. The Director for Defense Research and Engineering (DDR&E) has responded to this challenge by defining and sponsoring a transformational initiative in Science and Technology (S&T) - the National Aerospace Initiative (NAI) - which will have a fundamental impact on our nation's military capabilities and on the aerospace industry in general. The NAI is planned as a joint effort among the tri-services, DOD agencies and National Aeronautics and Space Administration (NASA). It is comprised of three major focus areas or pillars: 1) High Speed Hypersonics (HSH), 2) Space Access (SA), and 3) Space Technology (ST). This paper addresses the Space Access pillar. The NAI-SA team has employed a unique approach to identifying critical technologies and demonstrations for satisfying both military and civilian space access capabilities needed in the future. For planning and implementation purposes the NAI-SA is divided into five technology subsystem areas: Airframe, Propulsion, Flight Subsystems, Operations and Payloads. Detailed technology roadmaps were developed under each subsystem area using a time-phased, goal oriented approach that provides critical space access capabilities in a timely manner and involves subsystem ground and flight demonstrations. This S&T plan addresses near-term (2009), mid-term (2016), and long-term (2025) goals and objectives for space access. In addition, system engineering and integration approach was used to make sure that the plan addresses the requirements of the end users. This paper describes in some detail the technologies in NAI-Space Access pillar. Some areas of emphasis are: high temperature materials, thermal protection systems, long life, lightweight, highly efficient airframes, metallic and composite cryotanks, advanced liquid rocket engines, integrated vehicle health monitoring and management, highly operable systems and payloads. Implementation strategies for NAI are also described.

  20. Temporal and modal characterization of DoD source air toxic ...

    EPA Pesticide Factsheets

    This project tested three, real-/near real-time monitoring techniques to develop air toxic emission factors for Department of Defense (DoD) platform sources. These techniques included: resonance enhanced multi photon ionization time of flight mass spectrometry (REMPI-TOFMS) for organic air toxics, laser induced breakdown spectroscopy (LIBS) for metallic air toxics, and optical remote sensing (ORS) methods for measurement of criteria pollutants and other hazardous air pollutants (HAPs). Conventional emission measurements were used for verification of the real-time monitoring results. The REMPI-TOFMS system was demonstrated on the following: --a United States U.S. Marine Corps (USMC) diesel generator, --a U.S. Air Force auxiliary power unit (APU), --the waste combustor at the Portsmouth Naval Shipyard, during a multi-monitor environmental technology verification (ETV) test for dioxin monitoring systems, --two dynamometer-driven high mobility multi-purpose wheeled vehicles (HMMWVs), --an idling Abrams battle tank, --a Bradley infantry fighting vehicle (IFV), and --an F-15 and multiple F-22 U.S. Air Force aircraft engines. LIBS was tested and applied solely to the U.S. Marine Corps diesel generator. The high detection limits of LIBS for toxic metals limited its usefulness as a real time analyzer for most DoD sources. ORS was tested only on the APU with satisfactory results for non-condensable combustion products (carbon monoxide [CO], carbon dioxide

  1. Should reporting of peri-neural invasion and extra prostatic extension be mandatory in prostate cancer biopsies? correlation with outcome in biopsy cases treated conservatively

    PubMed Central

    Ahmad, Amar S.; Parameshwaran, Vishnu; Beltran, Luis; Fisher, Gabrielle; North, Bernard V.; Greenberg, David; Soosay, Geraldine; Møller, Henrik; Scardino, Peter; Cuzick, Jack; Berney, Daniel M.

    2018-01-01

    The identification of perineural invasion (PNI) and extraprostatic extension (ECE) in prostate cancer (PC) biopsies is time consuming and can be difficult. Although this is required information in many datasets, there is little evidence on their effect on outcome in patients treated conservatively. Cases of PC were identified from three cancer registries in the UK from men with clinically localized prostate cancer diagnosed by needle biopsy from 1990–2003. The endpoint was prostate cancer death (DOD). Patients treated radically within 6 months, those with objective evidence of metastases or who had prior hormone therapy were excluded. Follow-up was through cancer registries up until 2012. Deaths were divided into those from PC and those from other causes, according to WHO criteria. 988 biopsy cases (6522 biopsy cores) were centrally reviewed by three uropathologists and assigned a Gleason score and Grade Group (GG). The presence of both PNI and ECE was recorded. Of 988 patients, PNI was present in 288 (DOD = 75) and ECE in 23 (DOD = 5). On univariable analysis PNI was highly significantly associated with DOD (hazard ratio [HR] 2.28, 95% CI: 1.68, 3.1, log-rank test p-value = 4.8 × 10–8), but ECE was not (log-rank test p-value = 0.334). On multivariable analysis with GG, serum PSA (per 10%), clinical stage and extent of disease (per 10%), PNI lost significance (HR 1.16, 95% CI: 0.83, 1.63, likelihood ratio test p-value = 0.371). The utility of routinely examining prostate biopsies for ECE and PNI is doubtful as it is not independently associated with higher grade, stage or prognosis. PMID:29755671

  2. Should reporting of peri-neural invasion and extra prostatic extension be mandatory in prostate cancer biopsies? correlation with outcome in biopsy cases treated conservatively.

    PubMed

    Ahmad, Amar S; Parameshwaran, Vishnu; Beltran, Luis; Fisher, Gabrielle; North, Bernard V; Greenberg, David; Soosay, Geraldine; Møller, Henrik; Scardino, Peter; Cuzick, Jack; Berney, Daniel M

    2018-04-17

    The identification of perineural invasion (PNI) and extraprostatic extension (ECE) in prostate cancer (PC) biopsies is time consuming and can be difficult. Although this is required information in many datasets, there is little evidence on their effect on outcome in patients treated conservatively. Cases of PC were identified from three cancer registries in the UK from men with clinically localized prostate cancer diagnosed by needle biopsy from 1990-2003. The endpoint was prostate cancer death (DOD). Patients treated radically within 6 months, those with objective evidence of metastases or who had prior hormone therapy were excluded. Follow-up was through cancer registries up until 2012. Deaths were divided into those from PC and those from other causes, according to WHO criteria. 988 biopsy cases (6522 biopsy cores) were centrally reviewed by three uropathologists and assigned a Gleason score and Grade Group (GG). The presence of both PNI and ECE was recorded. Of 988 patients, PNI was present in 288 (DOD = 75) and ECE in 23 (DOD = 5). On univariable analysis PNI was highly significantly associated with DOD (hazard ratio [HR] 2.28, 95% CI: 1.68, 3.1, log-rank test p -value = 4.8 × 10 -8 ), but ECE was not (log-rank test p -value = 0.334). On multivariable analysis with GG, serum PSA (per 10%), clinical stage and extent of disease (per 10%), PNI lost significance (HR 1.16, 95% CI: 0.83, 1.63, likelihood ratio test p -value = 0.371). The utility of routinely examining prostate biopsies for ECE and PNI is doubtful as it is not independently associated with higher grade, stage or prognosis.

  3. Visions of tomorrow: A focus on national space transportation issues; Proceedings of the Twenty-fifth Goddard Memorial Symposium, Greenbelt, MD, Mar. 18-20, 1987

    NASA Technical Reports Server (NTRS)

    Soffen, Gerald A. (Editor)

    1987-01-01

    The present conference on U.S. space transportation systems development discusses opportunities for aerospace students in prospective military, civil, industrial, and scientific programs, current strategic conceptualization and program planning for future U.S. space transportation, the DOD space transportation plan, NASA space transportation plans, medium launch vehicle and commercial space launch services, the capabilities and availability of foreign launch vehicles, and the role of commercial space launch systems. Also discussed are available upper stage systems, future space transportation needs for space science and applications, the trajectory analysis of a low lift/drag-aeroassisted orbit transfer vehicle, possible replacements for the Space Shuttle, LEO to GEO with combined electric/beamed-microwave power from earth, the National Aerospace Plane, laser propulsion to earth orbit, and a performance analysis for a laser-powered SSTO vehicle.

  4. 75 FR 9548 - Reduction of Use of Social Security Numbers (SSN) in the Department of Defense (DoD)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... authorization to receive specific categories of information. Computer network. The constituent element of an... elements reside on a computer. Form. A fixed arrangement of captioned spaces designed for entering and... activities of the Government or because of the information value of the data in them. Survey. An instrument...

  5. Naval Research Laboratory 1986 Review

    DTIC Science & Technology

    1986-01-01

    Behavior and Properties of Materials 84 Constrained- Layer Damping of Structure-Borne Sound 85 Computer-Controlled Emissivity Measurement System 87...Epitaxial Layers 128 Phase-Controlltd Gyrotron Oscillators 130 -SiC Transistor Development 133 Kinetic Inductance Microstrip Lines 136 Energetic...experiments in --- the areas of upper atmospheric, solar , and astro- ., ._ .nomical research aboard NASA, DoD, and foreign space projects. Division

  6. DITEC: Technology Matching Tool (TMT)

    DTIC Science & Technology

    2016-08-01

    of cyberattacks, cybersecurity has become one of the Department of Defense’s (DoD) top priorities. The marketplace of cybersecurity technologies is... cybersecurity products and services. The Space and Naval Warfare Systems Center Pacific’s (SSC Pacific) IA Division has developed the DoD-Centric and...Independent Technology Evaluation Capability (DITEC) to streamline cybersecurity technology evaluation. Specifically, DITEC defines a process for

  7. The unexploded ordnance (UXO) contamination problem and the state of the art of UXO remediation technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomsen, K.O.; Richardson, C.B.; Valder, K.M.

    1996-12-31

    Millions of acres of US government property are contaminated with unexploded ordnance (UXO) as a result of weapons system testing and troop training activities conducted over the past century at Department of Defense (DoD) sites. Recent DoD downsizing has resulted in the closing of many military bases, many of which are contaminated with UXO. One unexpected result of DoD`s downsizing is the attention focused on the unique problems associated with UXO remediation at these closed military bases. The U.S. Army Environmental Center (U SAEC) is the lead DoD agency for UXO clearance technology demonstrations, evaluation, and technology transfer. USAEC directedmore » the Naval Explosive Ordnance Disposal Technology Division (NAVEODTECHDIV) to serve as the technical lead for the advanced technology demonstration (ATD) program. In 1994, USAEC and NAVEODTECHDIV created controlled test facilities at the U.S. Army Jefferson Proving Ground in Madison, Indiana, to demonstrate and evaluate commercial UXO clearance systems and technologies. Phase I controlled site demonstrations were conducted during the summer of 1994. These demonstrations were followed by the Phase II controlled site demonstrations at JPG. This paper presents the results of the Phase II controlled site demonstrations. The overall performance of the demonstrators is presented along with the operational characteristics and limitations of the various systems and technologies evaluated. Individual demonstrator performance statistics are evaluated by sensor type and sensor transport method.« less

  8. An Evaluation of a High Pressure Regulator for NASA's Robotic Lunar Lander Spacecraft

    NASA Technical Reports Server (NTRS)

    Burnside, Christopher G.; Trinh, Huu P.; Pedersen, Kevin W.

    2013-01-01

    The Robotic Lunar Lander (RLL) development project office at NASA Marshall Space Flight Center is currently studying several lunar surface science mission concepts. The focus is on spacecraft carrying multiple science instruments and power systems that will allow extended operations on the lunar surface or other air-less bodies in the solar system. Initial trade studies of launch vehicle options indicate the spacecraft will be significantly mass and volume constrained. Because of the investment by the DOD in low mass, highly volume efficient components, NASA has investigated the potential integration of some of these technologies in space science applications. A 10,000 psig helium pressure regulator test activity has been conducted as part of the overall risk reduction testing for the RLL spacecraft. The regulator was subjected to typical NASA acceptance testing to assess the regulator response to the expected RLL mission requirements. The test results show the regulator can supply helium at a stable outlet pressure of 740 psig within a +/- 5% tolerance band and maintain a lock-up pressure less than the +5% above nominal outlet pressure for all tests conducted. Numerous leak tests demonstrated leakage less than 10-3 standard cubic centimeters per second (SCCS) for the internal seat leakage at lock-up and less than 10-5 SCCS for external leakage through the regulator body. The successful test has shown the potential for 10,000 psig helium systems in NASA spacecraft and has reduced risk associated with hardware availability and hardware ability to meet RLL mission requirements.

  9. Assessment of erosion and deposition in steep mountain basins by differencing sequential digital terrain models

    NASA Astrophysics Data System (ADS)

    Cavalli, Marco; Goldin, Beatrice; Comiti, Francesco; Brardinoni, Francesco; Marchi, Lorenzo

    2017-08-01

    Digital elevation models (DEMs) built from repeated topographic surveys permit producing DEM of Difference (DoD) that enables assessment of elevation variations and estimation of volumetric changes through time. In the framework of sediment transport studies, DEM differencing enables quantitative and spatially-distributed representation of erosion and deposition within the analyzed time window, at both the channel reach and the catchment scale. In this study, two high-resolution Digital Terrain Models (DTMs) derived from airborne LiDAR data (2 m resolution) acquired in 2005 and 2011 were used to characterize the topographic variations caused by sediment erosion, transport and deposition in two adjacent mountain basins (Gadria and Strimm, Vinschgau - Venosta valley, Eastern Alps, Italy). These catchments were chosen for their contrasting morphology and because they feature different types and intensity of sediment transfer processes. A method based on fuzzy logic, which takes into account spatially variable DTMs uncertainty, was used to derive the DoD of the study area. Volumes of erosion and deposition calculated from the DoD were then compared with post-event field surveys to test the consistency of two independent estimates. Results show an overall agreement between the estimates, with differences due to the intrinsic approximations of the two approaches. The consistency of DoD with post-event estimates encourages the integration of these two methods, whose combined application may permit to overcome the intrinsic limitations of the two estimations. The comparison between 2005 and 2011 DTMs allowed to investigate the relationships between topographic changes and geomorphometric parameters expressing the role of topography on sediment erosion and deposition (i.e., slope and contributing area) and describing the morphology influenced by debris flows and fluvial processes (i.e., curvature). Erosion and deposition relations in the slope-area space display substantial differences between the Gadria and the Strimm basins. While in the former erosion and deposition clusters are reasonably well discriminated, in the latter, characterized by a complex stepped structure, we observe substantial overlapping. Erosion mostly occurred in areas that show persistency of concavity or transformation from convex and flat to concave surfaces, whereas deposition prevailingly took place on convex morphologies. Less expected correspondences between curvature and topographic changes can be explained by the variable sediment transport processes, which are often characterized by alternation of erosion and deposition between different events and even during the same event.

  10. LAD-C: A large area debris collector on the ISS

    NASA Technical Reports Server (NTRS)

    Liou, J.-C.; Giovane, F. J.; Corsaro, R. D.; Burchell, M. J.; Drolshagen, G.; Kawai, H.; Stansbery, E. G.; Tabata, M.; Westphal, A. J.; Yano, H.

    2006-01-01

    The Large Area Debris Collector (LAD-C) is a 10 sq m aerogel and acoustic sensor system under development by the U.S. Naval Research Laboratory (NRL) with main collaboration from the NASA Orbital Debris Program Office at Johnson Space Center, JAXA Institute of Space and Astronautical Science (ISAS), Chiba University (Japan), ESA Space Debris Office, University of California at Berkeley, and University of Kent at Canterbury (UK). The U.S. Department of Defense (DoD) Space Test Program (STP) has assumed the responsibility for having the system manifested and deployed on the International Space Station (ISS), and then having it retrieved and returned to Earth after one to two years. LAD-C will attempt to utilize the ISS as a scientific platform to characterize the near-Earth meteoroid and orbital debris environment in the size regime where little data exist. In addition to meteoroid and orbital debris sample return, the acoustic sensors will record impact time, location, signal strength, and acoustic waveform data of the largest collected samples. A good time-dependent meteoroid and orbital debris flux estimate can be derived. Analysis of the data will also enable potential source identification of some of the collected samples. This dynamical link can be combined with laboratory composition analysis of impact residuals extracted from aerogel to further our understanding of orbital debris population, and the sources of meteoroids, asteroids and comets.

  11. STS-44 Space Shuttle mission report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W.

    1992-01-01

    The STS-44 Space Shuttle Program Mission Report is a summary of the vehicle subsystem operations during the forty-fourth flight of the Space Shuttle Program and the tenth flight of the Orbiter vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-53 (LWT-46); three Space Shuttle main engines (SSME's) (serial numbers 2015, 2030, and 2029 in positions 1, 2, and 3, respectively); and two Solid Rocket Boosters (SRB's) designated as BI-047. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each one of the SRB's were designated as 360L019A for the left SRB and 360W019B for the right SRB. The primary objective of the STS-44 mission was to successfully deploy the Department of Defense (DOD) Defense Support Program (DSP) satellite/inertial upper stage (IUS) into a 195 nmi. earth orbit at an inclination of 28.45 deg. Secondary objectives of this flight were to perform all operations necessary to support the requirements of the following: Terra Scout, Military Man in Space (M88-1), Air Force Maui Optical System Calibration Test (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment-3 (RME-3), Visual Function Tester-1 (VFT-1), and the Interim Operational Contamination Monitor (IOCM) secondary payloads/experiments.

  12. Using simulation and virtual machines to identify information assurance requirements

    NASA Astrophysics Data System (ADS)

    Banks, Sheila B.; Stytz, Martin R.

    2010-04-01

    The US military is changing its philosophy, approach, and technologies used for warfare. In the process of achieving this vision for high-speed, highly mobile warfare, there are a number of issues that must be addressed and solved; issues that are not addressed by commercial systems because Department of Defense (DoD) Information Technology (IT) systems operate in an environment different from the commercial world. The differences arise from the differences in the scope and skill used in attacks upon DoD systems, the interdependencies between DoD software systems used for network centric warfare (NCW), and the need to rely upon commercial software components in virtually every DoD system. As a result, while NCW promises more effective and efficient means for employing DoD resources, it also increases the vulnerability and allure of DoD systems to cyber attack. A further challenge arises due to the rapid changes in software and information assurance (IA) requirements and technologies over the course of a project. Therefore, the four challenges that must be addressed are determining how to specify the information assurance requirements for a DoD system, minimizing changes to commercial software, incorporation of new system and IA requirements in a timely manner with minimal impact, and insuring that the interdependencies between systems do not result in cyber attack vulnerabilities. In this paper, we address all four issues. In addition to addressing the four challenges outlined above, the interdependencies and interconnections between systems indicate that the IA requirements for a system must consider two important facets of a system's IA defensive capabilities. The facets are the types of IA attacks that the system must repel and the ability of a system to insure that any IA attack that penetrates the system is contained within the system and does not spread. The IA requirements should be derived from threat assessments for the system as well as for the need to address the four requirements challenges outlined above. To address these issues, we developed a system architecture and acquisition approach designed to separate the system's IA capabilities requirements and development from the other system capability requirements; thereby, allowing the IA capabilities to be developed rapidly and assessed separately from the other system capabilities. Simulation environments and technologies allow us to test and evaluate solutions to the issues while also insuring that the system being tested and the solution are not exposed to real-world threats.

  13. Gas chromatography-mass spectrometry analysis of di-n-octyl disulfide in a straight oil metalworking fluid: application of differential permeation and Box-Cox transformation.

    PubMed

    Xu, Wenhai; Que Hee, Shane S

    2006-01-06

    The aim of this study was to identify and quantify an unknown peak in the chromatogram of a very complex mixture, a straight oil metalworking fluid (MWF). The fraction that permeated through a thin nitrile polymer membrane had less mineral oil background than the original MWF did at the retention time of the unknown peak, thus facilitating identification by total ion current (TIC) gas chromatography-mass spectrometry (GC-MS). The peak proved to be di-n-octyl disulfide (DOD) through retention time and mass spectral comparisons. Quantitation of DOD was by extracted ion chromatogram analysis of the DOD molecular ion (mass-to-charge ratio (m/z) 290), and of the m/z 71 ion for the internal standard, n-triacontane. Linear models of the area ratio (y) of these two ions versus DOD concentration showed a systematic negative bias at low concentrations, a common occurrence in analysis. The linear model of y(0.8) (from Box-Cox power transformation) versus DOD concentration showed negligible bias from the lowest measured standard of 1.51 mg/L to the highest concentration tested at 75.5 mg/L. The intercept did not differ statistically from zero. The concentration of DOD in the MWF was then calculated to be 0.398+/-0.034% (w/w) by the internal standard method, and 0.387+/-0.036% (w/w) by the method of standard additions. These two results were not significantly different at p < or = 0.05. The Box-Cox transformation is therefore recommended when the data for standards are non-linear.

  14. Overseas Assignment of Sponsors who have Children with Disabilities Who Are Space-Required Students in the Department of Defense Dependents Schools (DoDDS)

    DTIC Science & Technology

    1992-03-01

    reference (d)), general medical care is provided to family members on a space-available basis. 7. ’ndivuglzed Education Program. ( IEP ) A written document...participate in and benefit from his or her education. The IEP is further described in, and prepared under, reference (b). 8. pin oint Location. A specific...member the special education or related services required by an IEP or an evaluation required by DoD Instruction 1342.12 (reference (b)). 5. This

  15. STS-33 Discovery, OV-103, early morning liftoff from KSC LC Pad 39B

    NASA Image and Video Library

    1989-11-22

    STS033-S-003 (22 Nov 1989) --- The Space Shuttle Discovery heads for Earth-orbit on the first post-Challenger nocturnal launch. Liftoff occurred at 7:23:29:989 p.m. (EST), November 22, 1989. This picture shows almost a full front view of the Space Shuttle Discovery, its two Solid Rocket Boosters (SRB) and the External Tank (ET). Onboard for the Department of the Defense (DOD) devoted mission were astronauts Frederick D. Gregory, John E. Blaha, F. Story Musgrave, Kathryn C. Thornton and Manley L. Carter.

  16. 77 FR 14319 - Unmanned Aircraft System Test Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... DoD and NASA. A project at a test range (a defined geographic area where research and development are..., the FAA believes that the new test sites need to include focal points to ensure that research is... and experience in conducting UAS operations and research. Methods that test site operators can use for...

  17. Ada Dual-Use Summary: Ada Dual-Use Workshop Held in Vienna, Virginia on October 19-20, 1993. Ada Dual-Use Committee Briefing, November 8, 1993

    DTIC Science & Technology

    1993-11-29

    Certification: Initial Continuing Fund Experimentatlonal Research: Same Design , Implement In Ada, C, C++ Same Problem, Develop With Multiple Methodologies ...allowing analysts ( non programmers) to ’parit’ specifications for screens, reports, databases and etc 2) generating from design specifications 75% of...before the non -defense sector did and designed a tool to tackle the problem. DOD tested the tool and it worked. But DOD hasn’t put Ada to work in a

  18. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for Research, Development, Test, and Evaluation, Fiscal Year 1987.

    DTIC Science & Technology

    1987-01-01

    Headquarters Services Directorate for Information Operations and Reports D) ,( /NT IS lientitra on nn Iber for hIs bh act& r, s (i0 ’F H 7 FOREWORD 500...This report provides information on the 500 contractors that received the largest dollar volume in Department of Defense (DOD) prime contract awards... report presents summary data on the 500 prime contractors receiving the largest dollar volume in Department of Defense (DOD) awards over $25,000 for

  19. Telehealth forging ahead: overcoming barriers in licensure to improve access to care for service members.

    PubMed

    Stout, Katie Ambrose; Martinez, Kristina

    2011-01-01

    The telehealth initiatives of the Department of Defense (DoD) and Veterans' Health Administration (VHA) continue to test the limits of technology to provide the best care to our service members, veterans and their families. The DoD and VHA have credentialing systems in place to allow clinical practice between facilities. New legislation in the form of the Servicemembers' Telemedicine and E-Health Portability (STEP) Act will potentially expand telehealth clinical services across state lines into the homes of our service members and veterans.

  20. Fast charging nickel-metal hydride traction batteries

    NASA Astrophysics Data System (ADS)

    Yang, Xiao Guang; Liaw, Bor Yann

    This paper describes the fast charge ability, or "fast rechargeability", of nominal 85 Ah Ni-MH modules under various fast charge conditions, including constant current (CC); typically 1-3C, and constant power (CP) regimes. Our tests revealed that there is no apparent difference between CC and CP fast charge regimes with respect to charge efficiency and time. Following the USABC Electric Vehicle Battery Test Procedures Manual (Revision 2, 1996), we demonstrated that we were able to return 40% state of charge (SOC) from 60% depth of discharge (DOD) to 20% DOD within 15 min. Most importantly, we found that the internal pressure of the cell is the most critical parameter in the control of the fast charge process and the safe operation of the modules.

  1. Thermal Radiation Source Test Facility, Kirtland Air Force Base, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, W.F.

    This report describes the Thermal Radiation Source (TRS) Test Facility at Kirtland AF Base, New Mexico. It lists the instrumentation and equipment available for use by DOD and other government agencies studying the effects produced by nuclear weapons.

  2. 77 FR 11367 - Defense Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation of Comprehensive... Program for Negotiation of Comprehensive Small Business Subcontracting Plans. DATES: Effective Date... Fiscal Year 2012, (Pub. L. 112-81). Section 866 amends the DoD Test Program for Negotiation of...

  3. Applications of ISES for meteorology

    NASA Technical Reports Server (NTRS)

    Try, Paul D.

    1990-01-01

    The results are summarized from an initial assessment of the potential real-time meteorological requirements for the data from Eos systems. Eos research scientists associated with facility instruments, investigator instruments, and interdisciplinary groups with data related to meteorological support were contacted, along with those from the normal operational user and technique development groups. Two types of activities indicated the greatest need for real-time Eos data: technology transfer groups (e.g., NOAA's Forecasting System Laboratory and the DOD development laboratories), and field testing groups with airborne operations. A special concern was expressed by several non-U.S. participants who desire a direct downlink to be sure of rapid receipt of the data for their area of interest. Several potential experiments or demonstrations are recommended for ISES which include support for hurricane/typhoon forecasting, space shuttle reentry, severe weather forecasting (using microphysical cloud classification techniques), field testing, and quick reaction of instrumented aircraft to measure such events as polar stratospheric clouds and volcanic eruptions.

  4. Range Commanders Council Meteorology Group 88th Meeting: NASA Marshall Space Flight Center Task Report, 2004

    NASA Technical Reports Server (NTRS)

    Roberts, Barry C.

    2004-01-01

    Supported Return-to-Flight activities by providing surface climate data from Kennedy Space Center used primarily for ice and dew formation studies, and upper air wind analysis primarily used for ascent loads analyses. The MSFC Environments Group's Terrestrial and Planetary Environments Team documented Space Shuttle day-of-launch support activities by publishing a document in support of SSP Return-to-Flight activities entitled "Space Shuttle Program Flight Operations Support". The team also formalized the Shuttle Natural Environments Technical Panel and chaired the first special session of the SSP Natural Environments Panel meeting at KSC, November 4-7,2003.58 participants from NASA, DOD and other government agencies from across the country attended the meeting.

  5. Preserving the nuclear option: The AIAA position paper on space nuclear power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, D.M.; Bennett, G.L.; El-Genk, M.S.

    1996-03-01

    In response to published reports about the decline in funding for space nuclear power, the Board of Directors of the American Institute of Aeronautics and Astronautics (AIAA) approved a position paper in March 1995 that recommends (1) development and support of an integrated space nuclear power program by DOE, NASA and DoD; (2) Congressional support for the program; (3) advocacy of the program by government and industry leaders; and (4) continuation of cooperation between the U.S. and other countries to advance nuclear power source technology and to promote safety. This position paper has been distributed to various people having oversightmore » of the U.S. space nuclear power program. {copyright} {ital 1996 American Institute of Physics.}« less

  6. Open Innovation and Technology Maturity Analysis

    DTIC Science & Technology

    2007-09-11

    Management Process Develop a framework which incorporates DoD Acquisition Management framework (e.g: TRLs), DoD Business Transformation strategies...Public Organizations (DoD): DoD Force Transformation : • Support the Joint Warfighting Capability of the DoD • Enable Rapid Access to Information for...Survey - 2007  Defense Transformation : Clear Leadership, Accountability, and Management Tools Are Needed to Enhance DOD’s Efforts to Transform Military

  7. Retaining the 3D framework of zinc sponge anodes upon deep discharge in Zn-air cells.

    PubMed

    Parker, Joseph F; Nelson, Eric S; Wattendorf, Matthew D; Chervin, Christopher N; Long, Jeffrey W; Rolison, Debra R

    2014-11-26

    We fabricate three-dimensional zinc electrodes from emulsion-cast sponges of Zn powder that are thermally treated to produce rugged monoliths. This highly conductive, 3D-wired aperiodic scaffold achieves 740 mA h gZn(-1) when discharged in primary Zn-air cells (>90% of theoretical Zn capacity). We use scanning electron microscopy and X-ray diffraction to monitor the microstructural evolution of a series of Zn sponges when oxidized in Zn-air cells to specific depths-of-discharge (20, 40, 60, 80% DOD) at a technologically relevant rate (C/40; 4-6 mA cm(-2)). The Zn sponges maintain their 3D-monolithic form factor at all DOD. The cell resistance remains low under all test conditions, indicating that an inner core of metallic Zn persists that 3D-electrically wires the electrode, even to deep DOD.

  8. Operationally Responsive Space Launch for Space Situational Awareness Missions

    NASA Astrophysics Data System (ADS)

    Freeman, T.

    The United States Space Situational Awareness capability continues to be a key element in obtaining and maintaining the high ground in space. Space Situational Awareness satellites are critical enablers for integrated air, ground and sea operations, and play an essential role in fighting and winning conflicts. The United States leads the world space community in spacecraft payload systems from the component level into spacecraft and in the development of constellations of spacecraft. This position is founded upon continued government investment in research and development in space technology, which is clearly reflected in the Space Situational Awareness capabilities and the longevity of these missions. In the area of launch systems that support Space Situational Awareness, despite the recent development of small launch vehicles, the United States launch capability is dominated by unresponsive and relatively expensive launchers in the Expandable, Expendable Launch Vehicles (EELV). The EELV systems require an average of six to eight months from positioning on the launch table until liftoff. Access to space requires maintaining a robust space transportation capability, founded on a rigorous industrial and technology base. To assure access to space, the United States directed Air Force Space Command to develop the capability for operationally responsive access to space and use of space to support national security, including the ability to provide critical space capabilities in the event of a failure of launch or on-orbit capabilities. Under the Air Force Policy Directive, the Air Force will establish, organize, employ, and sustain space forces necessary to execute the mission and functions assigned including rapid response to the National Command Authorities and the conduct of military operations across the spectrum of conflict. Air Force Space Command executes the majority of spacelift operations for DoD satellites and other government and commercial agencies. The Command researched and identified a course of action that has maximized operationally responsive space for Low-Earth-Orbit Space Situational Awareness assets. On 1 Aug 06, Air Force Space Command activated the Space Development and Test Wing (SDTW) to perform development, test and evaluation of Air Force space systems and to execute advanced space deployment and demonstration projects to exploit new concepts and technologies, and rapidly migrate capabilities to the warfighter. The SDTW charged the Launch Test Squadron (LTS) to develop the operationally responsive spacelift capability for Low-Earth-Orbit Space Situational Awareness assets. The LTS created and executed a space enterprise strategy to place small payloads (1500 pounds), at low cost (less than 28M to 30M per launch), repeatable and rapidly into 100 - 255 nautical miles orbits. In doing so, the squadron provides scalable launch support services including program management support, engineering support, payload integration, and post-test evaluation for space systems. The Air Force, through the SDTW/LTS, will continue to evolve as the spacelift execution arm for Space Situational Awareness by creating small, less-expensive, repeatable and operationally responsive space launch capability.

  9. STS-38 Atlantis, OV-104, during safing operations after KSC SLF landing

    NASA Image and Video Library

    1990-11-20

    Spotlights illuminate Atlantis, Orbiter Vehicle (OV) 104, during safing operations at the Kennedy Space Center's (KSC's) Shuttle Landing Facility (SLF). OV-104 parked on runway 33 is serviced by KSC ground crews. STS-38, a Department of Defense (DOD)-devoted mission, came to an end (with complete wheel stop) at 4:43:37 pm (Eastern Standard Time (EST)).

  10. Insights from Existing Data on the DoD Industrial Base: Guided Missile and Space Vehicle Manufacturing Example

    DTIC Science & Technology

    2015-05-01

    ELECTRIC BOAT CORP 798 SDB Air Force RAYTHEON CO 790 DDG 51 Navy HUNTINGTON INGALLS INC 694 DDG 51 Navy HUNTINGTON INGALLS INC 598 V22 Navy...Business Subcontractors SB subcontractors SB contracts SB dollars # % # % Amount % SDB , self identified 6 5 10 5 6,658,000 2 Woman Owned 17 15 37 17

  11. Summary of the AIAA/NASA/DOD Orbital Debris Conference - Technical issues and future directions

    NASA Technical Reports Server (NTRS)

    Potter, A.; Kessler, D.; Nieder, R.; Reynolds, R.

    1990-01-01

    An international conference on orbital debris was held on April 16-19, 1990, in Baltimore, Maryland. Topics of the conference included the implications of orbital debris for space flight, orbital debris measurements, modeling of the orbital debris environment, and methods to reduce the growth of the orbital debris population. Significant results from this meeting are summarized.

  12. Strategic Studies Quarterly. Volume 10, Number 2, Summer 2016

    DTIC Science & Technology

    2016-01-01

    munitions, and networked command, control, communications , com- puters, intelligence, surveillance, and reconnaissance (C4ISR) has been a vital... communications , space capabilities, and networked intelligence, surveillance, and recon- naissance (ISR). The rapid pace of this proliferation is...intensity akin to that of the Manhattan Project or the Apollo Program. Building upon recent actions by Congress and DOD leadership, the next secretary of

  13. 47 CFR 25.260 - Time sharing between DoD meteorological satellite systems and non-voice, non-geostationary...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... satellite systems and non-voice, non-geostationary satellite systems in the 400.15-401 MHz band. 25.260... systems and non-voice, non-geostationary satellite systems in the 400.15-401 MHz band. (a) The space stations of a non-voice, non-geostationary Mobile-Satellite Service (NVNG MSS) system time-sharing downlink...

  14. 47 CFR 25.260 - Time sharing between DoD meteorological satellite systems and non-voice, non-geostationary...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... satellite systems and non-voice, non-geostationary satellite systems in the 400.15-401 MHz band. 25.260... systems and non-voice, non-geostationary satellite systems in the 400.15-401 MHz band. (a) The space stations of a non-voice, non-geostationary Mobile-Satellite Service (NVNG MSS) system time-sharing downlink...

  15. Report to Congress on Sustainable Ranges, 2009

    DTIC Science & Technology

    2009-05-01

    and undersea spaces under the administration of other nations with their permission and international areas. In each case, DoD must deal with a... undersea presentations designed for live or simulated weapons engagement. 6. Threats—Various physical and simulated threat presentations such as...Statements (EIS) are complete. The remaining Tactical Training Theater Assessment and Planning (TAP) program including the East Coast Undersea Warfare

  16. Military Medical Care: Questions and Answers

    DTIC Science & Technology

    2013-07-24

    services through either Department of Defense (DOD) medical facilities, known as “military treatment facilities” or “MTFs” as space is available, or...Chiefs of Staff, CAE /PEO =Component Acquisition Executive/Program Executive Officer, DHA OGC = Defense Health Agency Office of General Counsel, NCR...funding for all fixed medical treatment facilities/activities, including such costs as real property maintenance, environmental compliance, minor

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xu, X.; Matsumura, Y.; Stenberg, J.

    Spruce wood charcoal, macadamia shell charcoal, coal activated carbon, and coconut shell activated carbon catalyze the gasification of organic compounds in supercritical water. Feedstocks studied in this paper include glycerol, glucose, cellobiose, whole biomass feedstocks (depithed bagasse liquid extract and sewage sludge), and representative Department of Defense (DoD) wastes (methanol, methyl ethyl ketone, ethylene glycol, acetic acid, and phenol). The effects of temperature, pressure, reactant concentration, weight hourly space velocity, and the type of catalyst on the gasification of glucose are reported. Complete conversion of glucose (22% by weight in water) to a hydrogen-rich synthesis gas was realized at amore » weight hourly space velocity (WHSV) of 22.2 h{sup {minus}1} in supercritical water at 600 C, 34.5 MPa. Complete conversions of the whole biomass feeds were also achieved at the same temperature and pressure. The destruction efficiencies for the representative DoD wastes were also high. Deactivation of the carbon catalyst was observed after 4 h of operation without swirl in the entrance region of the reactor, but the carbon gasification efficiency remained near 100% for more than 6 h when a swirl generator was employed in the entrance of the reactor.« less

  18. Characterization of Orbital Debris via Hyper-Velocity Laboratory-Based Tests

    NASA Technical Reports Server (NTRS)

    Cowardin, Heather; Liou, J.-C.; Anz-Meador, Phillip; Sorge, Marlon; Opiela, John; Fitz-Coy, Norman; Huynh, Tom; Krisko, Paula

    2017-01-01

    Existing DOD and NASA satellite breakup models are based on a key laboratory test, Satellite Orbital debris Characterization Impact Test (SOCIT), which has supported many applications and matched on-orbit events involving older satellite designs reasonably well over the years. In order to update and improve these models, the NASA Orbital Debris Program Office, in collaboration with the Air Force Space and Missile Systems Center, The Aerospace Corporation, and the University of Florida, replicated a hypervelocity impact using a mock-up satellite, DebriSat, in controlled laboratory conditions. DebriSat is representative of present-day LEO satellites, built with modern spacecraft materials and construction techniques. Fragments down to 2 mm in size will be characterized by their physical and derived properties. A subset of fragments will be further analyzed in laboratory radar and optical facilities to update the existing radar-based NASA Size Estimation Model (SEM) and develop a comparable optical-based SEM. A historical overview of the project, status of the characterization process, and plans for integrating the data into various models will be discussed herein.

  19. Characterization of Orbital Debris via Hyper-Velocity Laboratory-Based Tests

    NASA Technical Reports Server (NTRS)

    Cowardin, Heather; Liou, J.-C.; Krisko, Paula; Opiela, John; Fitz-Coy, Norman; Sorge, Marlon; Huynh, Tom

    2017-01-01

    Existing DoD and NASA satellite breakup models are based on a key laboratory test, Satellite Orbital debris Characterization Impact Test (SOCIT), which has supported many applications and matched on-orbit events involving older satellite designs reasonably well over the years. In order to update and improve these models, the NASA Orbital Debris Program Office, in collaboration with the Air Force Space and Missile Systems Center, The Aerospace Corporation, and the University of Florida, replicated a hypervelocity impact using a mock-up satellite, DebriSat, in controlled laboratory conditions. DebriSat is representative of present-day LEO satellites, built with modern spacecraft materials and construction techniques. Fragments down to 2 mm in size will be characterized by their physical and derived properties. A subset of fragments will be further analyzed in laboratory radar and optical facilities to update the existing radar-based NASA Size Estimation Model (SEM) and develop a comparable optical-based SEM. A historical overview of the project, status of the characterization process, and plans for integrating the data into various models will be discussed herein.

  20. Advanced Devices for Cryogenic Thermal Management

    NASA Astrophysics Data System (ADS)

    Bugby, D.; Stouffer, C.; Garzon, J.; Beres, M.; Gilchrist, A.

    2006-04-01

    This paper describes six advanced cryogenic thermal management devices/subsystems developed by Swales Aerospace for ground/space-based applications of interest to NASA, DoD, and the commercial sector. The devices/subsystems described herein include the following: (a) a differential thermal expansion cryogenic thermal switch (DTE-CTSW) constructed with high purity aluminum end-pieces and an Ultem support rod for the 6 K Mid-Infrared Instrument (MIRI) on the James Webb Space Telescope (JWST) (b) a quad-redundant DTE-CTSW assembly for the 35 K science instruments (NIRCam, NIRSpec, and FGS) mounted on the JWST Integrated Science Instrument Module (ISIM) (c) a cryogenic diode heat pipe (CDHP) thermal switching system using methane as the working fluid for the 100 K CRISM hyperspectral mapping instrument on the Mars Reconnaissance Orbiter (MRO) and (d) three additional devices/subsystems developed during the AFRL-sponsored CRYOTOOL program, which include a dual DTE-CTSW/dual cryocooler test bed, a miniaturized neon cryogenic loop heat pipe (mini-CLHP), and an across gimbal cryogenic thermal transport system (GCTTS). For the first three devices/subsystems mentioned above, this paper describes key aspects of the development efforts including concept definition, design, fabrication, and testing. For the latter three, this paper provides brief overview descriptions as key details are provided in a related paper.

  1. Solar Radio Burst Effects and Meteor Effects: Operational Products Under Development at the Joint SMC-AFRL Rapid Prototyping Center

    NASA Astrophysics Data System (ADS)

    Quigley, S.

    2002-05-01

    The Air Force Research Laboratory (AFRL/VSB) and Detachment 11, Space & Missile Systems Center (SMC, Det 11/CIT) have combined efforts to design, develop, test, and implement graphical products for the Air Force's space weather operations center. These products are generated to analyze, specify, and forecast the effects of the near-earth space environment on Department of Defense systems and communications. Jointly-developed products that will be added to real-time operations in the near future include a solar radio background and burst effects (SoRBE) product suite, and a meteor effects (ME) product suite. The SoRBE product addresses the effect of background and event-level solar radio output on operational DoD systems. Strong bursts of radio wave emissions given off by the sun during solar ``events'' can detrimentally affect radar and satellite communication systems that have operational receiving geometries within the field of view of the sun. For some systems, even the background radiation from the sun can produce effects. The radio frequency interference (RFI) of interest occurs on VHF, UHF, and SHF frequency bands, usually lasting several minutes during a solar flare. While such effects are limited in time and area (typically a few degrees in viewing angle), they can be quite severe in magnitude. The result can be a significant lack in a radar system's ability to detect and/or track an object, and loss of a communication system's ability to receive satellite signals. The ME product will address the detrimental effects of meteors on operational DoD systems. These include impacts on satellites, visible trail observations, and radar clutter. While certain types of individual meteors can produce system effects, the initial ME product will address the more generalized range of meteor shower activity and associated affects. These effects can result in damage to satellites, incorrect assessment of satellite sensor observations, and false target returns on radar systems. For both of these products, we describe the background science and operational history; along with product inputs, outputs, dissemination, and customer uses.

  2. The past as prologue - A look at historical flight qualifications for space nuclear systems

    NASA Technical Reports Server (NTRS)

    Bennett, Gary L.

    1992-01-01

    Currently the U.S. is sponsoring production of radioisotope thermoelectric generators (RTGs) for the Cassini mission to Saturn; the SP-100 space nuclear reactor power system for NASA applications; a thermionic space reactor program for DoD applications as well as early work on nuclear propulsion. In an era of heightened public concern about having successful space ventures it is important that a full understanding be developed of what it means to 'flight qualify' a space nuclear system. As a contribution to the ongoing work this paper reviews several qualification programs, including the general-purpose heat source radioisotope thermoelectric generators (GPHS-RTGs) as developed for the Galileo and Ulysses missions, the SNAP-10A space reactor, the Nuclear Engine for Rocket Vehicle Applications (NERVA), the F-1 chemical engine used on the Saturn-V, and the Space Shuttle Main Engines (SSMEs). Similarities and contrasts are noted.

  3. The past as prologue - A look at historical flight qualifications for space nuclear systems

    NASA Astrophysics Data System (ADS)

    Bennett, Gary L.

    Currently the U.S. is sponsoring production of radioisotope thermoelectric generators (RTGs) for the Cassini mission to Saturn; the SP-100 space nuclear reactor power system for NASA applications; a thermionic space reactor program for DoD applications as well as early work on nuclear propulsion. In an era of heightened public concern about having successful space ventures it is important that a full understanding be developed of what it means to 'flight qualify' a space nuclear system. As a contribution to the ongoing work this paper reviews several qualification programs, including the general-purpose heat source radioisotope thermoelectric generators (GPHS-RTGs) as developed for the Galileo and Ulysses missions, the SNAP-10A space reactor, the Nuclear Engine for Rocket Vehicle Applications (NERVA), the F-1 chemical engine used on the Saturn-V, and the Space Shuttle Main Engines (SSMEs). Similarities and contrasts are noted.

  4. DOD Open Government

    Science.gov Websites

    Skip to main content (Press Enter). DOD Open Government Logo DOD Open Government U.S. Department of Defense Search DOD Open Government: Home Open Government @ DoD Transparency Congressional Inquiries Cooperation Regulatory Program Initiatives FRD Declassification DARPA Open Catalog Contact Us 2016

  5. Impulse response of a two-dimensional rough surface overlying an inhomogeneous, nondispersive medium: A hybrid model

    NASA Astrophysics Data System (ADS)

    Keiffer, Richard; Novarini, Jorge; Norton, Guy

    2002-11-01

    A numerical model to calculate the impulse response of a two-dimensional, impenetrable, rough surface directly in the time domain has been recently introduced [R. S. Keiffer and J. C. Novarini, J. Acoust. Soc. Am. 107, 27-39 (2000)]. This model is based on wedge diffraction theory and assumes the half-space containing the source and receiver is homogeneous. In this work, the model is extended to handle media where the index of refraction varies with depth by merging the scattering model with a ray-based propagation model. The resulting hybrid model is tested against a finite-difference time-domain (FDTD) method for backscattering from a corrugated surface in the presence of a refractive layer. This new model can be applied, for example, to calculate acoustic reverberation from the sea surface in cases where the water mass is inhomogeneous and dispersion is negligible. [Work supported by ONR/NRL (PE 61153N-32) and by grants of computer time DoD HPC Shared Resource Center at Stennis Space Center, MS.

  6. 32 CFR 165.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... distributed across the specific number of units. The nonrecurring research, development, test, and evaluation... significant military equipment on the United States Munitions List having a nonrecurring research, development... for research, development, test, and evaluation shall be based on DoD obligations recorded to the date...

  7. Characterization of Orbital Debris Via Hyper-Velocity Ground-Based Tests

    NASA Technical Reports Server (NTRS)

    Cowardin, Heather

    2015-01-01

    To replicate a hyper-velocity fragmentation event using modern-day spacecraft materials and construction techniques to better improve the existing DoD and NASA breakup models. DebriSat is intended to be representative of modern LEO satellites.Major design decisions were reviewed and approved by Aerospace subject matter experts from different disciplines. DebriSat includes 7 major subsystems. Attitude determination and control system (ADCS), command and data handling (C&DH), electrical power system (EPS), payload, propulsion, telemetry tracking and command (TT&C), and thermal management. To reduce cost, most components are emulated based on existing design of flight hardware and fabricated with the same materials. A key laboratory-based test, Satellite Orbital debris Characterization Impact Test (SOCIT), supporting the development of the DoD and NASA satellite breakup models was conducted at AEDC in 1992 .Breakup models based on SOCIT have supported many applications and matched on-orbit events reasonably well over the years.

  8. Child Development Programs (CDPs)

    DTIC Science & Technology

    1993-01-19

    Child Abuse Training Modules for Caregivers, DoD Child Abuse Training Modules for Family Child Care Providers, DoD Family Child Care Training Modules, DoD CDP Standards and Inspection Checklist, DoD Child Development Need Survey, The DoD School-Age Care Training Modules, and DD Form 2636, DoD Certificate to Operate Child Development Programs, consistent with reference (9). 4. Implements Pub. L. No. 101-189, Title XV (reference (h)). 5. Replaces references (i) through

  9. Bridging the Technology Readiness "Valley of Death" Utilizing Nanosats

    NASA Technical Reports Server (NTRS)

    Bauer, Robert A.; Millar, Pamela S.; Norton, Charles D.

    2015-01-01

    Incorporating new technology is a hallmark of space missions. Missions demand ever-improving tools and techniques to allow them to meet the mission science requirements. In Earth Science, these technologies are normally expressed in new instrument capabilities that can enable new measurement concepts, extended capabilities of existing measurement techniques, or totally new detection capabilities, and also, information systems technologies that can enhance data analysis or enable new data analyses to advance modeling and prediction capabilities. Incorporating new technologies has never been easy. There is a large development step beyond demonstration in a laboratory or on an airborne platform to the eventual space environment that is sometimes referred to as the "technology valley of death." Studies have shown that non-validated technology is a primary cause of NASA and DoD mission delays and cost overruns. With the demise of the New Millennium Program within NASA, opportunities for demonstrating technologies in space have been rare. Many technologies are suitable for a flight project after only ground testing. However, some require validation in a relevant or a space flight environment, which cannot be fully tested on the ground or in airborne systems. NASA's Earth Science Technology Program has initiated a nimble program to provide a fairly rapid turn-around of space validated technologies, and thereby reducing future mission risk in incorporating new technologies. The program, called In-Space Validation of Earth Science Technology (InVEST), now has five tasks in development. Each are 3U CubeSats and they are targeted for launch opportunities in the 2016 time period. Prior to formalizing an InVEST program, the technology program office was asked to demonstrate how the program would work and what sort of technologies could benefit from space validation. Three projects were developed and launched, and have demonstrated the technologies that they set out to validate. This paper will provide a brief status of the pre-InVEST CubeSats, and discuss the development and status of the InVEST program. Figure

  10. 28 CFR 79.33 - Proof of participation onsite during a period of atmospheric nuclear testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... period of atmospheric nuclear testing. 79.33 Section 79.33 Judicial Administration DEPARTMENT OF JUSTICE... Participants § 79.33 Proof of participation onsite during a period of atmospheric nuclear testing. (a... atmospheric nuclear testing as a member of the armed forces or an employee or contractor employee of the DoD...

  11. 28 CFR 79.33 - Proof of participation onsite during a period of atmospheric nuclear testing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... period of atmospheric nuclear testing. 79.33 Section 79.33 Judicial Administration DEPARTMENT OF JUSTICE... Participants § 79.33 Proof of participation onsite during a period of atmospheric nuclear testing. (a... atmospheric nuclear testing as a member of the armed forces or an employee or contractor employee of the DoD...

  12. 28 CFR 79.33 - Proof of participation onsite during a period of atmospheric nuclear testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... period of atmospheric nuclear testing. 79.33 Section 79.33 Judicial Administration DEPARTMENT OF JUSTICE... Participants § 79.33 Proof of participation onsite during a period of atmospheric nuclear testing. (a... atmospheric nuclear testing as a member of the armed forces or an employee or contractor employee of the DoD...

  13. Hexavalent Chrome Free Coatings for Electronics Applications: Joint Test Report

    NASA Technical Reports Server (NTRS)

    Rothgeb, Matt; Kessel, Kurt

    2013-01-01

    The overall objective of the Hexavalent Chrome Free Coatings for Electronics Applications project is to evaluate and test pretreatments not containing hexavalent chrome in avionics and electronics housing applications. This objective will be accomplished by testing strong performing coating systems from prior NASA and DoD testing or new coating systems as determined by the stakeholders.

  14. Reporting and Disclosing Intragovernmental Transactions for the FY 1997 DOD Consolidated Financial Statements.

    DTIC Science & Technology

    1998-09-21

    This report discusses the reporting and disclosing of intragovernmental transactions on FY 1997 DoD Component and FY 1997 DoD Consolidated Financial Statements . The...comply with the law, DoD prepared financial statements for the 16 reporting entities to be included in the FY 1997 DoD Consolidated Financial Statements . The...Consolidated Financial Statement. The overall audit objective was to determine whether the FY 1997 DoD Consolidated Financial Statements were presented

  15. Taking the Politics Out of Satellite and Space-Based Communications Protocols

    NASA Technical Reports Server (NTRS)

    Ivancic, William D.

    2006-01-01

    After many years of studies, experimentation, and deployment, large amounts of misinformation and misconceptions remain regarding applicability of various communications protocols for use in satellite and space-based networks. This paper attempts to remove much of the politics, misconceptions, and misinformation that have plagued spacebased communications protocol development and deployment. This paper provides a common vocabulary for communications; a general discussion of the requirements for various communication environments; an evaluation of tradeoffs between circuit and packet-switching technologies, and the pros and cons of various link, network, transport, application, and security protocols. Included is the applicability of protocol enhancing proxies to NASA, Department of Defense (DOD), and commercial space communication systems.

  16. 32 CFR 21.650 - DoD Components.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false DoD Components. 21.650 Section 21.650 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.650 DoD Components. The Office of the Secretary of...

  17. 32 CFR 21.650 - DoD Components.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false DoD Components. 21.650 Section 21.650 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.650 DoD Components. The Office of the Secretary of...

  18. 32 CFR 21.650 - DoD Components.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false DoD Components. 21.650 Section 21.650 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.650 DoD Components. The Office of the Secretary of...

  19. 32 CFR 21.650 - DoD Components.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false DoD Components. 21.650 Section 21.650 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.650 DoD Components. The Office of the Secretary of...

  20. 32 CFR 21.650 - DoD Components.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false DoD Components. 21.650 Section 21.650 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.650 DoD Components. The Office of the Secretary of...

  1. Engineering a responsive, low cost, tactical satellite, TACSAT-1

    NASA Astrophysics Data System (ADS)

    Hurley, M.; Duffey, T.; Huffine, Christopher; Weldy, Ken; Clevland, Jeff; Hauser, Joe

    2004-11-01

    The Secretary of Defense's Office of Force Transformation (OFT) is currently undertaking an initiative to develop a low-cost, responsive, operationally relevant space capability using small satellites. The Naval Research Laboratory (NRL) is tasked to be program manger for this initiative, which seeks to make space assets and capabilities available to operational users. TacSat-1 is the first in a series of small satellites that will result in rapid, tailored, and operationally relevant experimental space capabilities for tactical forces. Components of the resulting tactical architecture include a highly automated small satellite bus, modular payloads, common launch and payload interfaces, tasking and data dissemination using the SIPRNET (Secret Internet Protocol Routing Network), and low cost, rapid response launches. The overall goal of TacSat-1 is to demonstrate the utility of a broader complementary business model and provide a catalyst for energizing DoD and industry in the operational space area. This paper first provides a brief overview of the TacSat- 1 experiment and then discusses the engineering designs and practices used to achieve the aggressive cost and schedule goals. Non-standard approaches and engineering philosophies that allowed the TacSat-1 spacecraft to be finished in twelve months are detailed and compared with "normal" satellite programs where applicable. Specific subsystem design, integration and test techniques, which contributed to the successful completion of the TacSat-1 spacecraft, are reviewed. Finally, lessons learned are discussed.

  2. GPS Space Service Volume: Ensuring Consistent Utility Across GPS Design Builds for Space Users

    NASA Technical Reports Server (NTRS)

    Bauer, Frank H.; Parker, Joel Jefferson Konkl; Valdez, Jennifer Ellen

    2015-01-01

    GPS availability and signal strength originally specified for users on or near surface of Earth with transmitted power levels specified at edge-of-Earth, 14.3 degrees. Prior to the SSV specification, on-orbit performance of GPS varied from block build to block build (IIA, IIRM, IIF) due to antenna gain and beam width variances. Unstable on-orbit performance results in significant risk to space users. Side-lobe signals, although not specified, were expected to significantly boost GPS signal availability for users above the constellation. During GPS III Phase A, NASA noted significant discrepancies in power levels specified in GPS III specification documents, and measured on-orbit performance. To stabilize the signal for high altitude space users, NASA DoD team in 2003-2005 led the creation of new Space Service Volume (SSV) definition and specifications.

  3. STS-28 Columbia, OV-102, Commander Shaw aboard T-38A at Ellington Field

    NASA Image and Video Library

    1989-08-05

    STS-28 Columbia, Orbiter Vehicle (OV) 102, Commander Brewster H. Shaw, wearing navy blue flight coveralls and helmet, sits in T-38A forward cockpit. Shaw, along with his fellow crewmembers, is preparing for departure from Ellington Field to Kennedy Space Center (KSC). STS-28, a Department of Defense (DOD) dedicated mission, is scheduled for launch on 08-08-89.

  4. 76 FR 52643 - Notice Is Given of the Names of Members of a Performance Review Board for the Department of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    .... Air Force are: 1. Board President--Gen. Shelton, Commander, Air Force Space Command; 2. Lt. Gen. Lord... DEPARTMENT OF DEFENSE Department of the Air Force Notice Is Given of the Names of Members of a Performance Review Board for the Department of the Air Force AGENCY: Department of the Air Force, DOD. ACTION...

  5. Business Case Analysis of the Marine Corps Base Pendleton Virtual Smart Grid

    DTIC Science & Technology

    2017-06-01

    Metering Infrastructure on DOD installations. An examination of five case studies highlights the costs and benefits of the Virtual Smart Grid (VSG...studies highlights the costs and benefits of the Virtual Smart Grid (VSG) developed by Space and Naval Warfare Systems Command for use at Marine Corps...41 A. SMART GRID BENEFITS .....................................................................41 B. SUMMARY OF VSG ESTIMATED COSTS AND BENEFITS

  6. Micro-Stirling Active Cooling Module (MS/ACM) for DoD Electronics Systems

    DTIC Science & Technology

    2012-03-01

    MS/ACM uses miniaturized versions of components we have already developed for space-based cryocoolers for the MDA, AFRL, and NASA. Stirling...overcoming the technical challenges. Finally we describe the wide range of applications for Stirling-cycle coolers, cryocoolers , and generators...Applications: Figure 5 indicates the wide range of applications can benefit from our Stirling-cycle cooler, cryocooler , and generator technologies

  7. Metals and Ceramics Information Center.

    DTIC Science & Technology

    1981-07-01

    Systems RESOURCE MANAGEMENT AND ECONOMIC ANALYSIS a Ordnance Technology a Space Systems and Applications a Biomass Resources 6 Business Planning • Economics ...r 19 KEY WORDS (Cwintince on reverse side 4 neressery and identify by block numnber) Technical Information Center Composites DoD Information Analysis ...The Metals and Ceramics Information Center (MCIC) is one of the technical Information Analysis Centers (IAC’s) chartered and sponsored by the

  8. STS-28 Columbia, OV-102, Commander Shaw aboard T-38A at Ellington Field

    NASA Technical Reports Server (NTRS)

    1989-01-01

    STS-28 Columbia, Orbiter Vehicle (OV) 102, Commander Brewster H. Shaw, wearing navy blue flight coveralls and helmet, sits in T-38A forward cockpit. Shaw, along with his fellow crewmembers, is preparing for departure from Ellington Field to Kennedy Space Center (KSC). STS-28, a Department of Defense (DOD) dedicated mission, is scheduled for launch on 08-08-89.

  9. Acquisition Management: Agencies Can Improve Training on New Initiatives. Report to the Chairman, Subcommittee on Technology and Procurement Policy, Committee on Government Reform, House of Representatives.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    A study assessed strategies agencies use to ensure that their workforces are receiving the training necessary to implement acquisition initiatives. Focus was on the General Services Administration (GSA), National Aeronautics and Space Administration (NASA), and Department of Defense (DOD). Findings indicated that the critical elements important to…

  10. Report to Congress on Sustainable Ranges, 2008

    DTIC Science & Technology

    2008-01-01

    undersea areas located throughout the U.S. and abroad, to include the frequency spectrum and associated infrastructure needed to satisfy DoD’s...subject to formal use agreements between the Department and land owners. The DoD also utilizes various air, sea, and undersea space in the US, foreign...air, sea, and undersea presentations designed for live or simulated weapons engagement. [6] Threats—Various physical and simulated threat

  11. Defense Weather Satellites: DOD Faces Acquisition Challenges for Addressing Capability Needs

    DTIC Science & Technology

    2016-07-07

    stakeholders in conducting the AOA, it did not effectively collaborate with the National Oceanic and Atmospheric Administration (NOAA), which, on a...and compare the operational effectiveness and life cycle costs of potential solutions. This testimony is based on a report GAO issued in March...and its Space- Based Environmental Monitoring (SBEM) Analysis of Alternatives (AOA) to identify and compare the operational effectiveness and life

  12. Solar power R and D for Air Force space requirements

    NASA Technical Reports Server (NTRS)

    Wise, J. F.

    1980-01-01

    The requirements for improved solar power system technology for DOD satellites are reported. It is shown that the technology is required in several areas including solar cells, array blanket technology, energy storage and power system operation, and regulation and control. It is further shown that as the missions become more critical to defence, military aspects such as survivability, hardening, and eventually defence must be addressed.

  13. Immersion Cooling of Electronics in DoD Installations

    DTIC Science & Technology

    2016-05-01

    2012). Bitcoin Mining Electronics Cooling Development In January 2013, inventor/consultant Mark Miyoshi began development of a two-phase cooling...system using Novec 649 to be used for cooling bitcoin mining hardware. After a short trial period, hardware power supply and logic-board failures...are reports of bitcoin mining companies vertically stacking two-phase immersion baths to improve the floor space density, but this approach is likely

  14. Bottleneck Analysis on the DoD Pre-Milestone B Acquisition Processes

    DTIC Science & Technology

    2013-04-01

    Acquisition Processes Danielle Worger and Teresa Wu, Arizona State University Eugene Rex Jalao, Arizona State University and University of the...Danielle Worger and Teresa Wu, Arizona State University Eugene Rex Jalao, Arizona State University and University of the Philippines Christopher...Air Force Institute of Technology The RITE Approach to Agile Acquisition Timothy Boyce, Iva Sherman, and Nicholas Roussel Space and Naval Warfare

  15. Workshop on advanced technologies for planetary instruments

    NASA Technical Reports Server (NTRS)

    Appleby, J. (Editor)

    1993-01-01

    NASA's robotic solar system exploration program requires a new generation of science instruments. Design concepts are now judged against stringent mass, power, and size constraints--yet future instruments must be highly capable, reliable, and, in some applications, they must operate for many years. The most important single constraint, however, is cost: new instruments must be developed in a tightly controlled design-to-cost environment. Technical innovation is the key to success and will enable the sophisticated measurements needed for future scientific exploration. As a fundamental benefit, the incorporation of breakthrough technologies in planetary flight hardware will contribute to U.S. industrial competitiveness and will strengthen the U.S. technology base. The Workshop on Advanced Technologies for Planetary Instruments was conceived to address these challenges, to provide an open forum in which the NASA and DoD space communities could become better acquainted at the working level, and to assess future collaborative efforts. Over 300 space scientists and engineers participated in the two-and-a-half-day meeting held April 28-30, 1993, in Fairfax, Virginia. It was jointly sponsored by NASA's Solar System Exploration Division (SSED), within the Office of Space Science (OSS); NASA's Office of Advanced Concepts and Technology (OACT); DoD's Strategic Defense Initiative Organization (SDIO), now called the Ballistic Missile Defense Organization (BMDO); and the Lunar and Planetary Institute (LPI). The meeting included invited oral and contributed poster presentations, working group sessions in four sub-disciplines, and a wrap-up panel discussion. On the first day, the planetary science community described instrumentation needed for missions that may go into development during the next 5 to 10 years. Most of the second day was set aside for the DoD community to inform their counterparts in planetary science about their interests and capabilities, and to describe the BMDO technology base, flight programs, and future directions. The working group sessions and the panel discussion synthesized technical and programmatic issues from all the presentations, with a specific goal of assessing the applicability of BMDO technologies to science instrumentation for planetary exploration.

  16. Data Supporting the Environmental Liability Line Item on the FY 1999 DoD Financial Statements

    DTIC Science & Technology

    2000-07-27

    requires DoD and other Government agencies to prepare consolidated financial statements . This audit supports our audit of the FY 1999 DoD Agency-Wide...financial statements and future audits of financial statements. The FY 1999 DoD Agency-Wide Balance Sheet is part of the DoD consolidated financial statements and

  17. VA and DoD Operating as One

    DTIC Science & Technology

    2011-01-25

    Dextromethorphan Hydrobromide U UD ŕ RFO DoD Menthol + Cetylpyridinium Chloride, lozenge, I USE AS DIRECTED FOR COUGH I DoD ACETAMINOPHEN. 325 MG. TABLET...ORAL TAKE 1·2 TABS EVERY 4-6HOUR DoD BISMUTH SU8SAUCYLATE. 262 MG. TAB C~ CHEW 2 TABS EVERY 1/2 HOUR DoD Menthol + Cetylpyridinium Chloride

  18. Internet Technology on Spacecraft

    NASA Technical Reports Server (NTRS)

    Rash, James; Parise, Ron; Hogie, Keith; Criscuolo, Ed; Langston, Jim; Powers, Edward I. (Technical Monitor)

    2000-01-01

    The Operating Missions as Nodes on the Internet (OMNI) project has shown that Internet technology works in space missions through a demonstration using the UoSAT-12 spacecraft. An Internet Protocol (IP) stack was installed on the orbiting UoSAT-12 spacecraft and tests were run to demonstrate Internet connectivity and measure performance. This also forms the basis for demonstrating subsequent scenarios. This approach provides capabilities heretofore either too expensive or simply not feasible such as reconfiguration on orbit. The OMNI project recognized the need to reduce the risk perceived by mission managers and did this with a multi-phase strategy. In the initial phase, the concepts were implemented in a prototype system that includes space similar components communicating over the TDRS (space network) and the terrestrial Internet. The demonstration system includes a simulated spacecraft with sample instruments. Over 25 demonstrations have been given to mission and project managers, National Aeronautics and Space Administration (NASA), Department of Defense (DoD), contractor technologists and other decisions makers, This initial phase reached a high point with an OMNI demonstration given from a booth at the Johnson Space Center (JSC) Inspection Day 99 exhibition. The proof to mission managers is provided during this second phase with year 2000 accomplishments: testing the use of Internet technologies onboard an actual spacecraft. This was done with a series of tests performed using the UoSAT-12 spacecraft. This spacecraft was reconfigured on orbit at very low cost. The total period between concept and the first tests was only 6 months! On board software was modified to add an IP stack to support basic IP communications. Also added was support for ping, traceroute and network timing protocol (NTP) tests. These tests show that basic Internet functionality can be used onboard spacecraft. The performance of data was measured to show no degradation from current approaches. The cost to implement is much less than current approaches due to the availability of highly reliable and standard Internet tools. Use of standard Internet applications onboard reduces the risk of obsolescence inherent in custom protocols due to extremely wide use across all domains. These basic building blocks provide the framework for building onboard software to support direct user communication with payloads including payload control. Other benefits are payload to payload communication from dissimilar spacecraft, constellations of spacecraft, and reconfigurability on orbit. This work is funded through contract with the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC).

  19. Space program: Space debris a potential threat to Space Station and shuttle

    NASA Technical Reports Server (NTRS)

    Schwartz, Stephen A.; Beers, Ronald W.; Phillips, Colleen M.; Ramos, Yvette

    1990-01-01

    Experts estimate that more than 3.5 million man-made objects are orbiting the earth. These objects - space debris - include whole and fragmentary parts of rocket bodies and other discarded equipment from space missions. About 24,500 of these objects are 1 centimeter across or larger. A 1-centimeter man-made object travels in orbit at roughly 22,000 miles per hour. If it hit a spacecraft, it would do about the same damage as would a 400-pound safe traveling at 60 miles per hour. The Government Accounting Office (GAO) reviews NASA's plans for protecting the space station from debris, the extent and precision of current NASA and Defense Department (DOD) debris-tracking capabilities, and the extent to which debris has already affected shuttle operations. GAO recommends that the space debris model be updated, and that the findings be incorporated into the plans for protecting the space station from such debris. GAO further recommends that the increased risk from debris to the space shuttle operations be analyzed.

  20. The Effect of Variable End of Charge Battery Management on Small-Cell Batteries

    NASA Technical Reports Server (NTRS)

    Neubauer, Jeremy; Simmons, Nick; Bennetti, Andrea; Pearson, Chris; Reid, Concha

    2007-01-01

    ABSL Space Products is the world leading supplier of Lithium-ion batteries for space applications and has pioneered the use of small capacity COTS cells within large arrays. This small-cell approach has provided many benefits to space application designers through increased flexibility and reliability over more traditional battery designs. The ABSL 18650HC cell has been used in most ABSL space battery applications to date and has a recommended End Of Charge Voltage (EOCV) of 4.2V per cell. For all space applications using the ABSL 18650HC so far, this EOCV has been used at all stages of battery life from ground checkout to in orbit operations. ABSL and NASA have identified that, by using a lower EOCV for the same equivalent Depth Of Discharge (DOD), battery capacity fade could be reduced. The intention of this paper is to compare battery performance for systems with fixed and variable EOCV. In particular, the effect of employing the blanket value of 4.2V per cell versus utilizing a lower EOCV at Beginning Of Life (BOL) before gradually increasing it (as the effects of capacity fade drive the End Of Discharge Voltage closer to the acceptable system level minimum) is analyzed. Data is compared from ABSL in-house and NASA GRC tests that have been run under fixed and variable EOCV conditions. Differences in capacity fade are discussed and projections are made as to potential life extension capability by utilizing a variable EOCV strategy.

  1. Proceedings of the Conference on Chemical Risk Assessment in the DoD: science, Policy, and Practice Held in Dayton, Ohio on April 8-11, 1991

    DTIC Science & Technology

    1993-01-01

    eroforom their craft and trades." Ranmzini describes the prin- ample, doe odds are one in a billion that a person ciplecaus as: will die from cancer by...birth of mden quanitative risk assessment can be Our coimuiy’s entry into the " space race" stimulated Ix x Chemick Risk Asessment interest in the...health effects of continuous exposures to space - to the chemical or material in the specific situation of concern; cabin environments. In response to this

  2. Mission safety evaluation report for STS-39, postflight edition

    NASA Technical Reports Server (NTRS)

    Hardie, Kenneth O.; Hill, William C.; Finkel, Seymour I.

    1991-01-01

    After a delay of approximately 2 months due to a rollback from the pad to replace the External Tank door lug housing, Space Shuttle Discovery was launched from NASA-Kennedy at 7:33 a.m. Eastern Daylight Time on 28 April 1991. STS-39 was the first unclassified DoD Shuttle mission. On 28 April, countdown proceeded normally through the T-20 minute hold. No significant problems were encountered except for the Operations Sequence-2 recorder starting unexpectedly; it was stopped by an uplink command. Discovery landed on KSC runway 15 at 2:55 p.m. EDT on 6 May 1991. This was the second time in 6 months that the Space Shuttle was diverted to KSC for landing because of high winds at Edwards AFB, Calif. This was also the 7th of 40 Shuttle missions to land at KSC in the history of the Space Shuttle Program. The Main Landing Gear outer right tire shredded 3 of the 16 cords due to either an uneven landing or a maximum force breaking test during rollout. Contributing factors to the tire cord shredding were the development of last minute crosswinds and reluctance of the ground controllers to distract the Shuttle pilots with warnings of the low flight path. As a corrective action, communication procedures will be modified for future flights.

  3. Overview of the 1986 free-piston Stirling activities at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Alger, Donald L.

    1986-01-01

    An overview of the NASA Lewis Research Center's free-piston Stirling engine research is presented, including efforts to improve and advance its design for use in specific space power applications. These efforts are a part of the SP-100 program being conducted to support the Department of Defense (DOD), Department of Energy (DOE) and NASA. Such efforts include: (1) the testing and improvement of 25 kWe Stirling Space Power Demonstrator Engine (SPDE); (2) the preliminary design of 25 kWe single-cylinder Experimental stirling Space Engine (ESSE); and, (3) a study to determine the feasibility of scaling a single-cylinder free-piston Stirling engine/linear alternator to 150 kWe. Other NASA Lewis free-piston Stirling engine activities will be described, directed toward the advancement of general free-piston Stirling engine technology and its application in specific terrestrial applications. One such effort, supported by DOE/Oak Ridge National Laboratory (DRNL), is the development of a free-piston Stirling engine which produces hydraulic power. Finally, a terrestrial solar application involving a conceptual design of a 25 kWe Solar Advanced Stirling Conversion System (ASCS) capable of delivering power to an electric utility grid will be discussed. The latter work is supported by DOE/Sandia National Laboratory (SNLA).

  4. 77 FR 6704 - Exemptions From Entry Requirements and Report of Arrival Requirements for Certain Department of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... Missions Many vessels and aircraft that are under DoD's control and used to support DoD's missions do not... passengers supporting its missions under DoD's control through its own transportation system, the Defense... vessels and aircraft owned by, or under the complete control and management of DoD, or chartered by DoD...

  5. DoD Nuclear Weapons Personnel Reliability Assurance

    DTIC Science & Technology

    2016-04-27

    destructive power, and the potential consequences of an accident or unauthorized act. Assured nuclear weapons safety, security, and control remain of...DOD INSTRUCTION 5210.42 DOD NUCLEAR WEAPONS PERSONNEL RELIABILITY ASSURANCE Originating Component: Office of the Under Secretary of...from the DoD Issuances Website at http://www.dtic.mil/whs/directives. Reissues and renames: DoD Instruction 5210.42, “ Nuclear Weapons Personnel

  6. DoD Needs to Reinitiate Migration to Internet Protocol Version 6 (REDACTED)

    DTIC Science & Technology

    2014-12-01

    whether DoD was effectively migrating to Internet Protocol Version 6 ( IPv6 ). Finding Although DoD satisfied the requirement to demonstrate IPv6 on the...enterprise network to IPv6 . This occurred because: • DoD Chief Information Officer (CIO) and U.S. Cyber Command (USCYBERCOM) did not make IPv6 a...resources to further DoD-wide transition toward IPv6 ; and • DoD CIO did not have a current plan of action and milestones to advance DoD IPv6 migration

  7. Automated Rendezvous and Capture System Development and Simulation for NASA

    NASA Technical Reports Server (NTRS)

    Roe, Fred D.; Howard, Richard T.; Murphy, Leslie

    2004-01-01

    The United States does not have an Automated Rendezvous and Capture/Docking (AR and C) capability and is reliant on manned control for rendezvous and docking of orbiting spacecraft. This reliance on the labor intensive manned interface for control of rendezvous and docking vehicles has a significant impact on the cost of the operation of the International Space Station (ISS) and precludes the use of any U.S. expendable launch capabilities for Space Station resupply. The Soviets have the capability to autonomously dock in space, but their system produces a hard docking with excessive force and contact velocity. Automated Rendezvous and Capture/Docking has been identified as a key enabling technology for the Space Launch Initiative (SLI) Program, DARPA Orbital Express and other DOD Programs. The development and implementation of an AR&C capability can significantly enhance system flexibility, improve safety, and lower the cost of maintaining, supplying, and operating the International Space Station. The Marshall Space Flight Center (MSFC) has conducted pioneering research in the development of an automated rendezvous and capture (or docking) (AR and C) system for U.S. space vehicles. This AR&C system was tested extensively using hardware-in-the-loop simulations in the Flight Robotics Laboratory, and a rendezvous sensor, the Video Guidance Sensor was developed and successfully flown on the Space Shuttle on flights STS-87 and STS-95, proving the concept of a video- based sensor. Further developments in sensor technology and vehicle and target configuration have lead to continued improvements and changes in AR&C system development and simulation. A new Advanced Video Guidance Sensor (AVGS) with target will be utilized on the Demonstration of Autonomous Rendezvous Technologies (DART) flight experiment in 2004.

  8. Characterisation of betalain biosynthesis in Parakeelya flowers identifies the key biosynthetic gene DOD as belonging to an expanded LigB gene family that is conserved in betalain-producing species

    PubMed Central

    Chung, Hsiao-Hang; Schwinn, Kathy E.; Ngo, Hanh M.; Lewis, David H.; Massey, Baxter; Calcott, Kate E.; Crowhurst, Ross; Joyce, Daryl C.; Gould, Kevin S.; Davies, Kevin M.; Harrison, Dion K.

    2015-01-01

    Plant betalain pigments are intriguing because they are restricted to the Caryophyllales and are mutually exclusive with the more common anthocyanins. However, betalain biosynthesis is poorly understood compared to that of anthocyanins. In this study, betalain production and betalain-related genes were characterized in Parakeelya mirabilis (Montiaceae). RT-PCR and transcriptomics identified three sequences related to the key biosynthetic enzyme Dopa 4,5-dioxgenase (DOD). In addition to a LigB gene similar to that of non-Caryophyllales species (Class I genes), two other P. mirabilis LigB genes were found (DOD and DOD-like, termed Class II). PmDOD and PmDOD-like had 70% amino acid identity. Only PmDOD was implicated in betalain synthesis based on transient assays of enzyme activity and correlation of transcript abundance to spatio-temporal betalain accumulation. The role of PmDOD-like remains unknown. The striking pigment patterning of the flowers was due to distinct zones of red betacyanin and yellow betaxanthin production. The major betacyanin was the unglycosylated betanidin rather than the commonly found glycosides, an occurrence for which there are a few previous reports. The white petal zones lacked pigment but had DOD activity suggesting alternate regulation of the pathway in this tissue. DOD and DOD-like sequences were also identified in other betalain-producing species but not in examples of anthocyanin-producing Caryophyllales or non-Caryophyllales species. A Class I LigB sequence from the anthocyanin-producing Caryophyllaceae species Dianthus superbus and two DOD-like sequences from the Amaranthaceae species Beta vulgaris and Ptilotus spp. did not show DOD activity in the transient assay. The additional sequences suggests that DOD is part of a larger LigB gene family in betalain-producing Caryophyllales taxa, and the tandem genomic arrangement of two of the three B. vulgaris LigB genes suggests the involvement of duplication in the gene family evolution. PMID:26217353

  9. 76 FR 21712 - Notice of Intent To Grant a Partially Exclusive Patent License; PopTest Cortisol LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... Patent License; PopTest Cortisol LLC AGENCY: Department of the Navy, DoD. ACTION: Notice. SUMMARY: The Department of the Navy hereby gives notice of its intent to grant to PopTest Cortisol LLC, a revocable... detection of stress biomarkers including cortisol by fluorescence polarization''; and U.S. Patent...

  10. Hex Chrome Free Coatings for Electronics Overview

    NASA Technical Reports Server (NTRS)

    Kessel, Kurt

    2013-01-01

    The overall objective of the Hex Chrome Free Coatings for Electronics project is to evaluate and test pretreatment coating systems not containing hexavalent chrome in avionics and electronics housing applications. This objective will be accomplished by testing strong performing coating systems from prior NASA and DoD testing or new coating systems as determined by the stakeholders.

  11. 77 FR 23667 - Defense Advisory Committee on Military Personnel Testing; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... DEPARTMENT OF DEFENSE Office of the Secretary Defense Advisory Committee on Military Personnel Testing; Notice of Meeting AGENCY: Under Secretary of Defense for Personnel and Readiness, DoD. ACTION... 102-3.150, the Department of Defense announces that the following Federal advisory committee meeting...

  12. The 2004 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Topics covered include: Super NiCd(TradeMark) Energy Storage for Gravity Probe-B Relativity Mission; Hubble Space Telescope 2004 Battery Update; The Development of Hermetically Sealed Aerospace Nickel-Metal Hydride Cell; Serial Charging Test on High Capacity Li-Ion Cells for the Orbiter Advanced Hydraulic Power System; Cell Equalization of Lithium-Ion Cells; The Long-Term Performance of Small-Cell Batteries Without Cell-Balancing Electronics; Identification and Treatment of Lithium Battery Cell Imbalance under Flight Conditions; Battery Control Boards for Li-Ion Batteries on Mars Exploration Rovers; Cell Over Voltage Protection and Balancing Circuit of the Lithium-Ion Battery; Lithium-Ion Battery Electronics for Aerospace Applications; Lithium-Ion Cell Charge Control Unit; Lithium Ion Battery Cell Bypass Circuit Test Results at the U.S. Naval Research Laboratory; High Capacity Battery Cell By-Pass Switches: High Current Pulse Testing of Lithium-Ion; Battery By-Pass Switches to Verify Their Ability to Withstand Short-Circuits; Incorporation of Physics-Based, Spatially-Resolved Battery Models into System Simulations; A Monte Carlo Model for Li-Ion Battery Life Projections; Thermal Behavior of Large Lithium-Ion Cells; Thermal Imaging of Aerospace Battery Cells; High Rate Designed 50 Ah Li-Ion Cell for LEO Applications; Evaluation of Corrosion Behavior in Aerospace Lithium-Ion Cells; Performance of AEA 80 Ah Battery Under GEO Profile; LEO Li-Ion Battery Testing; A Review of the Feasibility Investigation of Commercial Laminated Lithium-Ion Polymer Cells for Space Applications; Lithium-Ion Verification Test Program; Panasonic Small Cell Testing for AHPS; Lithium-Ion Small Cell Battery Shorting Study; Low-Earth-Orbit and Geosynchronous-Earth-Orbit Testing of 80 Ah Batteries under Real-Time Profiles; Update on Development of Lithium-Ion Cells for Space Applications at JAXA; Foreign Comparative Technology: Launch Vehicle Battery Cell Testing; 20V, 40 Ah Lithium Ion Polymer Battery for the Spacesuit; Low Temperature Life-Cycle Testing of a Lithium-Ion Battery for Low-Earth-Orbiting Spacecraft; and Evaluation of the Effects of DoD and Charge Rate on a LEO Optimized 50 Ah Li-Ion Aerospace Cell.

  13. Evolution of US military space doctrine: precedents, prospects, and challenges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, D.J.

    This dissertation examines the evolution of US military space doctrine by: (1) defining military doctrine, its importance, and how it should be evaluated; (2) identifying principles of geopolitics, strategy, and war applicable to military space operations; (3) establishing how well does Air Force aerospace doctrine treat space issues and requirements for itself and the other Services: (4) identifying future directions for military space doctrine; and (5) postulating what might constitute a US military space doctrine in the future. The approach utilized incorporates analyses of the space environment, geopolitics, strategy, the principles of war, and the development of air power andmore » sea power to provide a framework of constants or invariants within which military space operations must be conducted. It also utilizes a framework of inconstants or variants, consisting of technology impacts and organizational requirements, to which military space doctrine must respond. Other doctrinal requirements are derived from the 1987 DOD space policy, the Strategic Defense Initiative, and international space law. Finally, an assessment is made of future concepts and directions of US military space doctrine.« less

  14. Ecological Risk Assessment Framework for Low-Altitude Overflights by Fixed-Wing and Rotary-Wing Military Aircraft

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Efroymson, R.A.

    2001-01-12

    This is a companion report to the risk assessment framework proposed by Suter et al. (1998): ''A Framework for Assessment of Risks of Military Training and Testing to Natural Resources,'' hereafter referred to as the ''generic framework.'' The generic framework is an ecological risk assessment methodology for use in environmental assessments on Department of Defense (DoD) installations. In the generic framework, the ecological risk assessment framework of the US Environmental Protection Agency (EPA 1998) is modified for use in the context of (1) multiple and diverse stressors and activities at a military installation and (2) risks resulting from causal chains,more » e.g., effects on habitat that indirectly impact wildlife. Both modifications are important if the EPA framework is to be used on military installations. In order for the generic risk assessment framework to be useful to DoD environmental staff and contractors, the framework must be applied to specific training and testing activities. Three activity-specific ecological risk assessment frameworks have been written (1) to aid environmental staff in conducting risk assessments that involve these activities and (2) to guide staff in the development of analogous frameworks for other DoD activities. The three activities are: (1) low-altitude overflights by fixed-wing and rotary-wing aircraft (this volume), (2) firing at targets on land, and (3) ocean explosions. The activities were selected as priority training and testing activities by the advisory committee for this project.« less

  15. An overview of DARPA's advanced space technology program

    NASA Astrophysics Data System (ADS)

    Nicastri, E.; Dodd, J.

    1993-02-01

    The Defense Advanced Research Projects Agency (DARPA) is the central research and development organization of the DoD and, as such, has the primary responsibility for the maintenance of U.S. technological superiority over potential adversaries. DARPA's programs focus on technology development and proof-of-concept demonstrations of both evolutionary and revolutionary approaches for improved strategic, conventional, rapid deployment and sea power forces, and on the scientific investigation into advanced basic technologies of the future. DARPA can move quickly to exploit new ideas and concepts by working directly with industry and universities. For four years, DARPA's Advanced Space Technology Program (ASTP) has addressed various ways to improve the performance of small satellites and launch vehicles. The advanced technologies that are being and will be developed by DARPA for small satellites can be used just as easily on large satellites. The primary objective of the ASTP is to enhance support to operational commanders by developing and applying advanced technologies that will provide cost-effective, timely, flexible, and responsive space systems. Fundamental to the ASTP effort is finding new ways to do business with the goal of quickly inserting new technologies into DoD space systems while reducing cost. In our view, these methods are prime examples of what may be termed 'technology leveraging.' The ASTP has initiated over 50 technology projects, many of which were completed and transitioned to users. The objectives are to quickly qualify these higher risk technologies for use on future programs and reduce the risk of inserting these technologies into major systems, and to provide the miniaturized systems that would enable smaller satellites to have significant - rather than limited - capability. Only a few of the advanced technologies are described, the majority of which are applicable to both large and small satellites.

  16. STS-33 DISCOVERY - ORBITER VEHICLE (OV)-103 - OFFICIAL CREW PORTRAIT

    NASA Image and Video Library

    1989-09-26

    S89-45737 (19 September 1989) --- Official STS-33 crew portrait. These five astronauts will be aboard the space shuttle Discovery for a scheduled November 1989 mission for the Department of Defense (DOD). Frederick D. Gregory (center, front) is mission commander. He is flanked by Kathryn C. Thornton and F. Story Musgrave, mission specialists. At rear are Manley L. Carter, Jr., mission specialist, and John E. Blaha, pilot.

  17. Diode-pumped Tunable 3 Micron Laser Sources

    DTIC Science & Technology

    2000-02-21

    DoD Ballistic Missile Defense Organization U.S. Army Space and Missile Defense Command SBIR Phase I Final Report AC Materials, Inc. 2721 Forsyth...pumped tunable 3 micron laser sources 6. AUTHORISI Arlete Cassanho, Hans Jenssen 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) AC Materials, Inc...impurities in the final crystal, starting materials for the crystal growth were prepared at AC Materials from optical grade barium fluoride and

  18. STS-28 Columbia, OV-102, landing at Edwards Air Force Base (EAFB) California

    NASA Image and Video Library

    1989-08-13

    STS028-S-013 (13 Aug 1989) --- The Space Shuttle Columbia is captured on film just prior to main gear touchdown at Edwards Air Force Base in Southern California. The landing marked a successful end to a five-day DOD-devoted mission. Onboard the spacecraft were Astronauts Brewster H. Shaw Jr., Richard N. Richards, David C. Leestma, James C. Adamson and Mark N. Brown.

  19. Military Training: DOD’s Annual Sustainable Ranges Report Addressed Statutory Reporting Requirements

    DTIC Science & Technology

    2015-06-01

    electromagnetic spectrum, (5) continued growth in domestic use of Unmanned Aerial Systems, (6) early coordination with renewable energy industry, and (7...unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 United States Government...challenges; (4) manage increasing military demand for range space; (5) address effects from new energy infrastructure and renewable energy effects; (6

  20. Coordination Without Borders Assigning US Military Officers to NGO World Headquarters: Rhetoric and Reality

    DTIC Science & Technology

    2009-05-21

    Freedom). The DoD has executed a ―go it alone‖ policy, i.e. US military forces have had to make the peace, resolve the issues and operationally manage ...rank or grade structures, assignment locations, career impacts, tour lengths, rating chains and position funding are issues the US military must...contrasts NGO operations when confronted with military commanders who manage ―battle space.‖ 14

  1. Aligning Infrastructure Decisions with Strategic Vision

    DTIC Science & Technology

    2012-03-22

    last ten years and produced several documents such as: Global Defense Posture Review ( GDPR ), Overseas Basing Commission Report, Base Realignment and...significant force structure changes in the form of GDPR , Army Modular Force, and the ARFORGEN process. These concurrent demands forced a holistic...returning to domestic bases as part of the GDPR and the reduction of leased space in the DoD portfolio.26 BRAC 2005 demonstrated failures in cost

  2. The Total Army

    DTIC Science & Technology

    2016-01-01

    basis for countries to cooperate on a range of issues from space exploration to addressing global climate change. Ironically, the success of this...countries to solve a current issue such as current “Friends of Yemen” and “Friends of Darfur”. While these groups are looser than a coalition, many of the...additional burden. Requirements Directed by the Department of Defense The Department of Defense uses DoD Directives (DoDDs) to issue institutional

  3. Blazing the trailway: Nuclear electric propulsion and its technology program plans

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.

    1992-01-01

    An overview is given of the plans for a program in nuclear electric propulsion (NEP) technology for space applications being considered by NASA, DOE, and DOD. Possible missions using NEP are examined, and NEP technology plans are addressed regarding concept development, systems engineering, nuclear fuels, power conversion, thermal management, power management and distribution, electric thrusters, facilities, and issues related to safety and environment. The programmatic characteristics are considered.

  4. DoD Source Selection: Competencies, Deficiencies, and Remedies

    DTIC Science & Technology

    2014-04-30

    University, Ministry of National Defense, Republic of China Strategic Planning and Management in Defense Systems Acquisition Stanley Rosen, Defense... systems procurement officer. He was employed in purchasing management for prime contractors on NASA’s Hubble Space Telescope, DoE’s Positron Electron...was living the good life, “he … was squandering precious tax dollars for, among other things, systems the military didn’t ask for, didn’t need and

  5. Designing a Forcenet Information Topology

    DTIC Science & Technology

    2004-12-01

    and limitations, but one consistent problem is that by tagging data the amount of bits needed to represent the data grows proportionately. As a...40 Frank Morning, Jr., “Smallsats Grow Up,” Aviation Week & Space Technology, December 8, 2003 41 Ibid. 32 (such as emails home or...Below are a few important points concerning a huge field of work. a. Dissimilar Redundancy and Reconstitution A growing concern within the DoD is

  6. DoD Standard Design for Vertical ASTs

    DTIC Science & Technology

    2015-04-27

    Roofs May-2012 33 56 13.15 Undertank Interstitial Space May-2012 33 56 63 Fuel Impermeable Liner System Apr-2006 32 13 15.20 Concrete Pavement ... Flexible Membrane Liner (FML) or  60 Mil HDPE Liner • NOT Concrete Surface • NOT Clay / Bentonite  Non-Woven Geotextile (Protective Layer...Required Flexible Membrane Liner 30  Non-Reinforced 60 mil High Density Polyethylene  Susceptible to Thermal Expansion and Degradation from

  7. LAUNCH - STS-28/51J - KSC

    NASA Image and Video Library

    1985-11-20

    S85-44776 (3 Oct 1985) --- Space Shuttle Atlantis soars toward Florida blue skies to mark the maiden mission of NASA's fourth and newest orbiter vehicle. Launch occurred at 11:15 a.m. (EDT), October 3, 1985. A five member crew mans the orbiter for the DOD flight. They are Karol J. Bobko, Ronald J. Grabe, Robert L. Stewart, David C. Hilmers-- all of NASA-- and William A. Pailes of the USAF.

  8. NASA R and T aerospace plane vehicles: Progress and plans

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.

    1985-01-01

    Progress made in key technologies such as materials, structures, aerothermodynamics, hypersonic aerodynamics, and hypersonic airbreathing propulsion are reported. Advances were made in more generic, areas such as active controls, flight computer hardware and software, and interdisciplinary analytical design methodology. These technology advances coupled with the development of and experiences with the Space Shuttle make feasible aerospace plane-type vehicles that meet the more demanding requirements of various DOD missions and/or an all-weather Shuttle II with reduced launch costs. Technology needs and high payoff technologies, and the technology advancements in propulsion, control-configured-vehicles, aerodynamics, aerothermodynamics, aerothermal loads, and materials and structures were studied. The highest payoff technologies of materials and structures including thermal-structural analysis and high temperature test techniques are emphasized. The high priority technology of propulsion, and plans, of what remains to be done rather than firm program commitments, are briefly discussed.

  9. Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 4: Detailed data. Part 2: Program plans and common support needs (a study of the commonality of space vehicle applications to future national needs

    NASA Technical Reports Server (NTRS)

    Bekey, I.; Mayer, H. L.; Wolfe, M. G.

    1976-01-01

    The methodology of alternate world future scenarios is utilized for selecting a plausible, though not advocated, set of future scenarios each of which results in a program plan appropriate for the respective environment. Each such program plan gives rise to different building block and technology requirements, which are analyzed for common need between the NASA and the DoD for each of the alternate world scenarios. An essentially invariant set of system, building block, and technology development plans is presented at the conclusion, intended to allow protection of most of the options for system concepts regardless of what the actual future world environment turns out to be. Thus, building block and technology needs are derived which support: (1) each specific world scenario; (2) all the world scenarios identified in this study; or (3) generalized scenarios applicable to almost any future environment. The output included in this volume consists of the building blocks, i.e.: transportation vehicles, orbital support vehicles, and orbital support facilities; the technology required to support the program plans; identification of their features which could support the DoD and NASA in common; and a complete discussion of the planning methodology.

  10. 32 CFR 185.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Authorities (DSCA). Support provided by U.S. Federal military forces, DoD civilians, DoD contract personnel... support to those authorities. Emergency Authority. A Federal military commander's authority, in.... Immediate Response Authority. A Federal military commander's, DoD Component Head's, and/or responsible DoD...

  11. 32 CFR 185.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Authorities (DSCA). Support provided by U.S. Federal military forces, DoD civilians, DoD contract personnel... support to those authorities. Emergency Authority. A Federal military commander's authority, in.... Immediate Response Authority. A Federal military commander's, DoD Component Head's, and/or responsible DoD...

  12. 32 CFR 185.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Authorities (DSCA). Support provided by U.S. Federal military forces, DoD civilians, DoD contract personnel... support to those authorities. Emergency Authority. A Federal military commander's authority, in.... Immediate Response Authority. A Federal military commander's, DoD Component Head's, and/or responsible DoD...

  13. 32 CFR 185.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Authorities (DSCA). Support provided by U.S. Federal military forces, DoD civilians, DoD contract personnel... support to those authorities. Emergency Authority. A Federal military commander's authority, in.... Immediate Response Authority. A Federal military commander's, DoD Component Head's, and/or responsible DoD...

  14. Shot BADGER, a test of the UPSHOT-KNOTHOLE Series, 18 April 1953. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Massie, J.; Maag, C.; Rohrer, S.

    1982-01-12

    This report describes the activities of DOD personnel in Shot BADGER, the sixth nuclear test in the UPSHOT-KNOTHOLE atmospheric nuclear weapons testing series. The test, conducted on 18 April 1953, involved military personnel in Exercise Desert Rock V, AFSWP, AFSWC, and AEC test activities. The largest activity was the 2d Marine Corps Provisional Atomic Exercise Brigade maneuver involving 2,167 Marines.

  15. A Perspective on the Use of Storable Propellants for Future Space Vehicle Propulsion

    NASA Technical Reports Server (NTRS)

    Boyd, William C.; Brasher, Warren L.

    1989-01-01

    Propulsion system configurations for future NASA and DOD space initiatives are driven by the continually emerging new mission requirements. These initiatives cover an extremely wide range of mission scenarios, from unmanned planetary programs, to manned lunar and planetary programs, to earth-oriented (Mission to Planet Earth) programs, and they are in addition to existing and future requirements for near-earth missions such as to geosynchronous earth orbit (GEO). Increasing space transportation costs, and anticipated high costs associated with space-basing of future vehicles, necessitate consideration of cost-effective and easily maintainable configurations which maximize the use of existing technologies and assets, and use budgetary resources effectively. System design considerations associated with the use of storable propellants to fill these needs are presented. Comparisons in areas such as complexity, performance, flexibility, maintainability, and technology status are made for earth and space storable propellants, including nitrogen tetroxide/monomethylhydrazine and LOX/monomethylhydrazine.

  16. Thermal control surfaces experiment flight system performance

    NASA Technical Reports Server (NTRS)

    Wilkes, Donald R.; Hummer, Leigh L.; Zwiener, James M.

    1991-01-01

    The Thermal Control Surfaces Experiment (TCSE) is the most complex system, other than the LDEF, retrieved after long term space exposure. The TCSE is a microcosm of complex electro-optical payloads being developed and flow by NASA and the DoD including SDI. The objective of TCSE was to determine the effects of the near-Earth orbital environment and the LDEF induced environment on spacecraft thermal control surfaces. The TCSE was a comprehensive experiment that combined in-space measurements with extensive post flight analyses of thermal control surfaces to determine the effects of exposure to the low earth orbit space environment. The TCSE was the first space experiment to measure the optical properties of thermal control surfaces the way they are routinely measured in a lab. The performance of the TCSE confirms that low cost, complex experiment packages can be developed that perform well in space.

  17. DoD Needs to Improve Screening and Access Controls for General Public Tenants Leasing Housing on Military Installations (REDACTED)

    DTIC Science & Technology

    2016-04-01

    DEPARTMENT OF THE ARMY SUBJECT: DoD Needs to Improve Screening and Access Controls for General Public Tenants Leasing Housing on Military...public tenants who leased DoD privatized housing before granting those tenants unescorted access to military installations. In addition, DoD officials...Military Housing Privatization Initiative (MHPI). Specifically, our objective was to determine whether DoD was effectively screening civilian tenants

  18. Earth Observing System (EOS)/Advanced Microwave Sounding Unit A (AMSU-A) configuration management plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1994-01-01

    This plan describes methods and procedures Aerojet will follow in the implementation of configuration control for each established baseline. The plan is written in response to the GSFC EOS CM Plan 420-02-02, dated January 1990, and also meets he requirements specified in DOD-STD-480, DOD-D 1000B, MIL-STD-483A, and MIL-STD-490B. The plan establishes the configuration management process to be used for the deliverable hardware, software, and firmware of the EOS/AMSU-A during development, design, fabrication, test, and delivery. This revision includes minor updates to reflect Aerojet's CM policies.

  19. AM2 Brickwork Pattern Evaluation

    DTIC Science & Technology

    2016-12-01

    pavement applications. Designation : D 6951. West Consho- hocken, PA: ASTM International. ASTM International. 2010a. Standard test method for in-place... design . This report provides test results for each evaluation and discussions comparing their perfor- mance to previous tests conducted under similar... designated by other authorized documents. DESTRUCTION NOTICE - For classified documents, follow the procedures in DOD5200.22-M, Industrial Security Manual

  20. DebriSat: The New Hypervelocity Impact Test for Satellite Breakup Fragment Characterization

    NASA Technical Reports Server (NTRS)

    Cowardin, Heather

    2015-01-01

    To replicate a hyper-velocity fragmentation event using modern-day spacecraft materials and construction techniques to better improve the existing DoD and NASA breakup models: DebriSat is intended to be representative of modern LEO satellites. Major design decisions were reviewed and approved by Aerospace subject matter experts from different disciplines. DebriSat includes 7 major subsystems. Attitude determination and control system (ADCS), command and data handling (C&DH), electrical power system (EPS), payload, propulsion, telemetry tracking and command (TT&C), and thermal management. To reduce cost, most components are emulated based on existing design of flight hardware and fabricated with the same materials. center dotA key laboratory-based test, Satellite Orbital debris Characterization Impact Test (SOCIT), supporting the development of the DoD and NASA satellite breakup models was conducted at AEDC in 1992. Breakup models based on SOCIT have supported many applications and matched on-orbit events reasonably well over the years.

Top