DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2009-09-01
September 4, 2009 presentation highlighting the Wind and Hydropower Program, addressing program goals and objectives, budgets, technology pathways, breakthroughs, and DOE solutions to market barriers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCluer, Megan
2009-09-04
September 4, 2009 presentation highlighting the Wind and Hydropower Program, addressing program goals and objectives, budgets, technology pathways, breakthroughs, and DOE solutions to market barriers.
2014 Water Power Program Peer Review: Hydropower Technologies, Compiled Presentations (Presentation)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This document represents a collection of all presentations given during the EERE Wind and Water Power Program's 2014 Hydropower Peer Review. The purpose of the meeting was to evaluate DOE-funded hydropower and marine and hydrokinetic R&D projects for their contribution to the mission and goals of the Water Power Program and to assess progress made against stated objectives.
DOE Hydropower Program biennial report 1996-1997 (with an updated annotated bibliography)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rinehart, B.N.; Francfort, J.E.; Sommers, G.L.
1997-06-01
This report, the latest in a series of biennial Hydropower Program reports sponsored by the US Department of Energy, summarizes the research and development and technology transfer activities of fiscal years 1996 and 1997. The report discusses the activities in the six areas of the hydropower program: advanced hydropower turbine systems; environmental research; hydropower research and development; renewable Indian energy resources; resource assessment; and technology transfer. The report also includes an annotated bibliography of reports pertinent to hydropower, written by the staff of the Idaho National Engineering and Environmental Laboratory, Oak Ridge National Laboratory, Federal and state agencies, cities, metropolitanmore » water districts, irrigation companies, and public and independent utilities. Most reports are available from the National Technical Information Service.« less
US hydropower resource assessment for Hawaii
DOE Office of Scientific and Technical Information (OSTI.GOV)
Francfort, J.E.
1996-09-01
US DOE is developing an estimate of the undeveloped hydropower potential in US. The Hydropower Evaluation Software (HES) is a computer model developed by INEL for this purpose. HES measures the undeveloped hydropower resources available in US, using uniform criteria for measurement. The software was tested using hydropower information and data provided by Southwestern Power Administration. It is a menu-driven program that allows the PC user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes, and generate reports. This report describes the resource assessment results for the State ofmore » Hawaii.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kao, Shih-Chieh
2014-04-25
The U.S. Department of Energy (DOE) Water Power Program tasked Oak Ridge National Laboratory with evaluating the new stream-reach development (NSD) resource potential of more than 3 million U.S. streams in order to help individuals and organizations evaluate the feasibility of developing new hydropower sources in the United States.
Sustainable hydropower in Lower Mekong Countries: Technical assessment and training travel report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Witt, Adam M.
The U.S. Agency for International Development (USAID), through their partnership with the U.S. Department of the Interior (DOI), requested the support of Oak Ridge National Laboratory (ORNL) to provide specialized technical assistance as part of the Smart Infrastructure for the Mekong (SIM) Program in Thailand. Introduced in July 2013 by U.S. Secretary of State John Kerry, SIM is a U.S. Government Inter-Agency program that provides Lower Mekong partner countries with targeted, demand-driven technical and scientific assistance to support environmentally sound, climate conscious and socially equitable infrastructure, clean energy development, and water resources optimization. The U.S. Government is committed to supportingmore » sustainable economic development within the region by providing tools, best practices, technical assistance, and lessons learned for the benefit of partner countries. In response to a request from the Electricity Generating Authority of Thailand (EGAT), a SIM project was developed with two main activities: 1) to promote hydropower sustainability and efficiency through technical assessment training at two existing hydropower assets in Thailand, and 2) the design and implementation of one national and two or three regional science and policy workshops, to be co-hosted with EGAT, to build common understanding of and commitment to environmental and social safeguards for Mekong Basin hydropower projects. The U.S. Department of Energy (DOE) is leading the technical assessment (Activity 1), and has contracted ORNL to provide expert technical assistance focused on increasing efficiency at existing projects, with the goal of increasing renewable energy generation at little to no capital cost. ORNL is the leading national laboratory in hydropower analysis, with a nationally recognized and highly qualified team of scientists addressing small to large-scale systems (basin-, regional-, and national-scale) energy generation optimization analysis for DOE. The mission of the ORNL Water Power Program is to develop technologies, decision-support tools, and methods of analysis that enable holistic management of water-dependent energy infrastructure and natural resources in support of the DOE Energy Efficiency and Renewable Energy Office (DOE-EERE), Federal hydropower agencies, Federal Energy Regulatory Commission (FERC), Nuclear Regulatory Commission (NRC), energy producers, and other entities. In support of SIM, ORNL completed technical assessments of two hydropower plants owned and operated by the Electricity Generating Authority of Thailand (EGAT): Vajiralongkorn (VRK), with an installed capacity of 300 MW, and Rajjaprabha (RPB), with an installed capacity of 240MW. Technical assessment is defined as the assessment of hydropower operation and performance, and the identification of potential opportunities for performance improvement through plant optimization. At each plant, the assessment included an initial analysis of hydropower operating and performance metrics, provided by dam owners. After this analysis, ORNL engaged with the plant management team in a skills exchange, where best practices, operational methods, and technical challenges were discussed. The technical assessment process was outlined to plant management followed by a presentation of preliminary results and analysis based on 50 days of operational data. EGAT has agreed to provide a full year of operational data so a complete and detailed assessment that captures seasonal variability can be completed. The results of these assessments and discussions will be used to develop a set of best practices, training, and procedure recommendations to improve the efficiency of the two assessed plants« less
Wind for Schools Affiliate Programs: Wind and Hydropower Technologies Program (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2009-12-01
The U.S. Department of Energy's (DOE's) Wind for Schools program is designed to raise awareness about the benefits of wind energy while simultaneously developing a wind energy knowledge base in future leaders of our communities, states, and nation. To accommodate the many stakeholders who are interested in the program, a Wind for Schools affiliate program has been implemented. This document describes the affiliate program and how interested schools may participate.
EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines: Technical Papers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hogan, T.
2011-12-01
The EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines was a component of a larger project. The goal of the overall project was to conduct the final developmental engineering required to advance the commercialization of the Alden turbine. As part of this effort, the conference provided a venue to disseminate information on the status of the Alden turbine technology as well as the status of other advanced turbines and research on environmentally-friendly hydropower turbines. The conference was also a product of a federal Memorandum of Understanding among DOE, USBR, and USACE to share technical information on hydropower. The conference was held inmore » Washington, DC on May 19 and 20, 2011 and welcomed over 100 attendees. The Conference Organizing Committee included the federal agencies with a vested interest in hydropower in the U.S. The Committee collaboratively assembled this conference, including topics from each facet of the environmentally-friendly conventional hydropower research community. The conference was successful in illustrating the readiness of environmentally-enhanced hydropower technologies. Furthermore, the topics presented illustrated the need for additional deployment and field testing of these technologies in an effort to promote the growth of environmentally sustainable hydropower in the U.S. and around the world.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2008-09-01
As part of its Native American outreach, DOE?s Wind Powering America program produces a newsletter to present Native American wind information, including projects, interviews with pioneers, issues, WPA activities, and related events. This issue features an interview with Dave Danz, a tribal planner for the Grand Portage Band of Chippewa in northeastern Minnesota, and a feature on the new turbine that powers the KILI radio station on the Pine Ridge Reservation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-02-01
This document represents a collection of all presentations given during the EERE Wind and Water Power Program's 2014 Marine and Hydrokinetic Peer Review. The purpose of the meeting was to evaluate DOE-funded hydropower and marine and hydrokinetic R&D projects for their contribution to the mission and goals of the Water Power Program and to assess progress made against stated objectives.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sale, Michael J.; Bishop, Norman A.; Reiser, Sonya L.
2014-09-01
In Section 7 of the Hydropower Regulatory Efficiency Act (HREA) of 2013 (P.L. 113-23), Congress directed the U.S. Department of Energy (DOE) to prepare an analysis of conduit hydropower opportunities available in the United States and to present case studies that describe the potential energy generation from these types of hydropower projects. Those analyses have been included in a new DOE report to Congress, and this ORNL/TM provides additional technical details supporting that report. Conduit hydropower offers important new ways to enhance renewable energy portfolios in the United States, as well as to increase the energy efficiency of water deliverymore » systems. Conduit hydropower projects are constructed on existing water-conveyance structures, such as irrigation canals or pressurized pipelines that deliver water to municipalities, industry, or agricultural water users. Although water conveyance infrastructures are usually designed for non-power purposes, new renewable energy can often be harvested from them without affecting their original purpose and without the need to construct new dams or diversions. Conduit hydropower differs from more conventional hydropower development in that it is generally not located on natural rivers or waterways and therefore does not involve the types of environmental impacts that are associated with hydropower. The addition of hydropower to existing water conduits can provide valuable new revenue sources from clean, renewable energy. The new energy can be used within the existing water distribution systems to offset other energy demands, or it can be sold into regional transmission systems.« less
Estimating the Effects of Climate Change on Federal Hydropower and Power Marketing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sale, Michael J; Kao, Shih-Chieh; Uria Martinez, Rocio
The U.S. Department of Energy is currently preparing an assessment of the effects of climate change on federal hydropower, as directed by Congress in Section 9505 of the Secure Water Act of 2009 (P.L. 111-11). This paper describes the assessment approach being used in a Report to Congress currently being prepared by Oak Ridge National Laboratory. The 9505 assessment will examine climate change effects on water available for hydropower operations and the future power supplies marketed from federal hydropower projects. It will also include recommendations from the Power Marketing Administrations (PMAs) on potential changes in operation or contracting practices thatmore » could address these effects and risks of climate change. Potential adaption and mitigation strategies will also be identified. Federal hydropower comprises approximately half of the U.S. hydropower portfolio. The results from the 9505 assessment will promote better understanding among federal dam owners/operators of the sensitivity of their facilities to water availability, and it will provide a basis for planning future actions that will enable adaptation to climate variability and change. The end-users of information are Congressional members, their staff, the PMAs and their customers, federal dam owners/operators, and the DOE Water Power Program.« less
Small Hydropower in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Johnson, Kurt
Small hydropower, defined in this report as hydropower with a generating capacity of up to 10 MW typically built using existing dams, pipelines, and canals has substantial opportunity for growth. Existing small hydropower comprises about 75% of the current US hydropower fleet in terms of number of plants. The economic feasibility of developing new small hydropower projects has substantially improved recently, making small hydropower the type of new hydropower development most likely to occur. In 2013, Congress unanimously approved changes to simplify federal permitting requirements for small hydropower, lowering costs and reducing the amount of time required to receive federalmore » approvals. In 2014, Congress funded a new federal incentive payment program for hydropower, currently worth approximately 1.5 cents/kWh. Federal and state grant and loan programs for small hydropower are becoming available. Pending changes in federal climate policy could benefit all renewable energy sources, including small hydropower. Notwithstanding remaining barriers, development of new small hydropower is expected to accelerate in response to recent policy changes.« less
Assessing Hydropower in the West
Johnson, Megan M.; Uria Martinez, Rocio
2015-06-01
On April 27, the U.S. Department of Energy (DOE) released the 2014 Hydropower Market Report, which provides a quantitative baseline on the distribution, capabilities, and status of hydropower in the United States. Although the report shows many interesting trends and figures, this article focuses on those related to the western region.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Levine, Aaron L.; Curtis, Taylor L.; Johnson, Kurt
Energy recovery hydropower is one of the most cost-effective types of new hydropower development because it is constructed utilizing existing infrastructure, and it is typically able to complete Federal Energy Regulatory Commission (FERC) review in 60 days. Recent changes in federal and state policy have supported energy recovery hydropower. In addition, some states have developed programs and policies to support energy recovery hydropower, including resource assessments, regulatory streamlining initiatives, and grant and loan programs to reduce project development costs. This report examines current federal and state policy drivers for energy recovery hydropower, reviews market trends, and looks ahead at futuremore » federal resource assessments and hydropower reform legislation.« less
New Small Hydropower Technology to be Deployed in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Opsahl, Egil; Gordon, Jim
2012-01-01
Earth By Design Inc, (EBD), in collaboration with Oak Ridge National Laboratory (ORNL), Knight Pi sold and Co., and CleanPower AS, has responded to a Funding Opportunity Announcement (FOA) published by the Department of Energy (DOE) in April 2011. EBD submitted a proposal to install an innovative, small hydropower technology, the Turbinator, a Norwegian technology from CleanPower. The Turbinator combines an axial flow, fixed-blade Kaplan turbine and generator in a compact and sealed machine. This makes it a very simple and easy technology to be deployed and installed. DOE has awarded funding for this two-year project that will be implementedmore » in Culver, Oregon. ORNL with the collaboration of CleanPower, will assess and evaluate the technology before and during the manufacturing phase and produce a full report to DOE. The goal of this phase-one report is to provide DOE Head Quarters (HQ), water power program management, a report with findings about the performance, readiness, capability, strengths and weakness, limitation of the technology, and potential full-scale deployment and application in the United States. Because of the importance of this information to the conventional hydropower industry and regulators, preliminary results will rapidly be distributed in the form of conference presentations, ORNL/DOE technical reports (publically available online, and publications in the peer-reviewed, scientific literature. These reports will emphasize the relevance of the activities carried out over the two-year study (i.e., performance, robustness, capabilities, reliability, and cost of the Turbinator). A final report will be submitted to a peer-reviewed publication that conveys the experimental findings and discusses their implications for the Turbinator application and implementation. Phase-two of the project consists of deployment, construction, and project operations. A detailed report on assessment and the performance of the project will be presented and communicated to DOE and published by ORNL.« less
DOE/PSU Graduate Student Fellowship Program for Hydropower
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cimbala, John M.
The primary objective of this project is to stimulate academic interest in the conventional hydropower field by supplying research support for at least eight individual Master of Science (MS) or Doctoral (PhD) level research projects, each consisting of a graduate student supervised by a faculty member. We have completed many of the individual student research projects: 2 PhD students have finished, and 4 are still working towards their PhD degree. 4 MS students have finished, and 2 are still working towards their MS degree, one of which is due to finish this April. In addition, 4 undergraduate student projects havemore » been completed, and one is to be completed this April. These projects were supervised by 7 faculty members and an Advisory/Review Panel. Our students and faculty have presented their work at national or international conferences and have submitted several journal publications. Three of our graduate students (Keith Martin, Dan Leonard and Hosein Foroutan) have received HRF Fellowships during the course of this project. All of the remaining students are anticipated to be graduated by the end of Fall Semester 2014. All of the tasks for this project will have been completed once all the students have been graduated, although it will be another year or two until all the journal publications have been finalized based on the work performed as part of this DOE Hydropower project.« less
Standard Modular Hydropower Technology Acceleration Workshop: Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Brennan T.; DeNeale, Scott T.; Witt, Adam M.
In support of the Department of Energy (DOE) funded Standard Modular Hydropower (SMH) Technology Acceleration project, Oak Ridge National Laboratory (ORNL) staff convened with five small hydropower technology entrepreneurs on June 14 and 15, 2017 to discuss gaps, challenges, and opportunities for small modular hydropower development. The workshop was designed to walk through SMH concepts, discuss the SMH research vision, assess how each participant’s technology aligns with SMH concepts and research, and identify future pathways for mutually beneficial collaboration that leverages ORNL expertise and entrepreneurial industry experience. The goal coming out of the workshop is to advance standardized, scalable, modularmore » hydropower technologies and development approaches with sustained and open dialogue among diverse stakeholder groups.« less
A Holistic Framework for Environmental Flows Determination in Hydropower Contexts
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamay, Ryan A; Bevelhimer, Mark S
2013-05-01
Among the ecological science community, the consensus view is that the natural flow regime sustains the ecological integrity of river systems. This prevailing viewpoint by many environmental stakeholders has progressively led to increased pressure on hydropower dam owners to change plant operations to affect downstream river flows with the intention of providing better conditions for aquatic biological communities. Identifying the neccessary magnitude, frequency, duration, timing, or rate of change of stream flows to meet ecological needs in a hydropower context is challenging because the ecological responses to changes in flows may not be fully known, there are usually a multitudemore » of competing users of flow, and implementing environmental flows usually comes at a price to energy production. Realistically, hydropower managers must develop a reduced set of goals that provide the most benefit to the identified ecological needs. As a part of the Department of Energy (DOE) Water Power Program, the Instream Flow Project (IFP) was carried out by Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Argon National Laboratory (ANL) as an attempt to develop tools aimed at defining environmental flow needs for hydropower operations. The application of these tools ranges from national to site-specific scales; thus, the utility of each tool will depend on various phases of the environmental flow process. Given the complexity and sheer volume of applications used to determine environmentally acceptable flows for hydropower, a framework is needed to organize efforts into a staged process dependent upon spatial, temporal, and functional attributes. By far, the predominant domain for determining environmental flows related to hydropower is within the Federal Energy Regulatory Commission (FERC) relicensing process. This process can take multiple years and can be very expensive depending on the scale of each hydropower project. The utility of such a framework is that it can expedite the environmental flow process by 1) organizing data and applications to identify predictable relationships between flows and ecology, and 2) suggesting when and where tools should be used in the environmental flow process. In addition to regulatory procedures, a framework should also provide the coordination for a comprehensive research agenda to guide the science of environmental flows. This research program has further reaching benefits than just environmental flow determination by providing modeling applications, data, and geospatial layers to inform potential hydropower development. We address several objectives within this document that highlight the limitations of existing environmental flow paradigms and their applications to hydropower while presenting a new framework catered towards hydropower needs. Herein, we address the following objectives: 1) Provide a brief overview of the Natural Flow Regime paradigm and existing environmental flow frameworks that have been used to determine ecologically sensitive stream flows for hydropower operations. 2) Describe a new conceptual framework to aid in determining flows needed to meet ecological objectives with regard to hydropower operations. The framework is centralized around determining predictable relationships between flow and ecological responses. 3) Provide evidence of how efforts from ORNL, PNNL, and ANL have filled some of the gaps in this broader framework, and suggest how the framework can be used to set the stage for a research agenda for environmental flow.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2015-04-02
The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government inmore » planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Wind Power Today and Tomorrow is an annual publication that provides an overview of the wind research conducted under the U.S. Department of Energy's Wind and Hydropower Technologies Program. The purpose of Wind Power Today and Tomorrow is to show how DOE supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describemore » the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry. This 2003 edition of the program overview also includes discussions about wind industry growth in 2003, how DOE is taking advantage of low wind speed region s through advancing technology, and distributed applications for small wind turbines.« less
National Hydropower Plant Dataset, Version 2 (FY18Q3)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Samu, Nicole; Kao, Shih-Chieh; O'Connor, Patrick
The National Hydropower Plant Dataset, Version 2 (FY18Q3) is a geospatially comprehensive point-level dataset containing locations and key characteristics of U.S. hydropower plants that are currently either in the hydropower development pipeline (pre-operational), operational, withdrawn, or retired. These data are provided in GIS and tabular formats with corresponding metadata for each. In addition, we include access to download 2 versions of the National Hydropower Map, which was produced with these data (i.e. Map 1 displays the geospatial distribution and characteristics of all operational hydropower plants; Map 2 displays the geospatial distribution and characteristics of operational hydropower plants with pumped storagemore » and mixed capabilities only). This dataset is a subset of ORNL's Existing Hydropower Assets data series, updated quarterly as part of ORNL's National Hydropower Asset Assessment Program.« less
Building a Bright Future. The Hydro Research Foundation's Fellowship Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaughn, Brenna; Linke, Deborah M.
The Hydro Fellowship Program (program) began as an experiment to discover whether the hydropower industry could find mechanisms to attract new entrants through conducting relevant research to benefit the industry. This nationwide, new-to-the-world program was started through funding from the Wind and Water Power Technologies Office of the Energy Efficiency and Renewable Energy (EERE) Office of the Department of Energy (DOE). Between 2010-2015, the Hydro Research Foundation (HRF) designed and implemented a program to conduct valuable research and attract new entrants to the hydro workforce. This historic grant has empowered and engaged industry members from 25 organizations by working withmore » 91 students and advisors at 24 universities in 19 states. The work funded answered pressing research needs in the fields of civil, mechanical, environmental, and electrical engineering, as well as law, energy engineering and materials innovation. In terms of number of individuals touched through funding, 148 individuals were supported by this work through direct research, mentorship, oversight of the work, partnerships and the day-to-day program administration. Based on the program results, it is clear that the funding achieved the hoped-for outcomes and has the capacity to draw universities into the orbit of hydropower and continue the conversation about industry research and development needs. The Foundation has fostered unique partnerships at the host universities and has continued to thrive with the support of the universities, advisors, industry and the DOE. The Foundation has demonstrated industry support through mentorships, partnerships, underwriting the costs and articulating the universities’ support through in-kind cost sharing. The Foundation recommends that future work be continued to nurture these graduate level programs using the initial work and improvements in the successor program, the Research Awards Program, while stimulating engagement of academia at the community college level for operations and maintenance workforce development.« less
Modelling a hydropower plant with reservoir with the micropower optimisation model (HOMER)
NASA Astrophysics Data System (ADS)
Canales, Fausto A.; Beluco, Alexandre; Mendes, Carlos André B.
2017-08-01
Hydropower with water accumulation is an interesting option to consider in hybrid systems, because it helps dealing with the intermittence characteristics of renewable energy resources. The software HOMER (version Legacy) is extensively used in research works related to these systems, but it does not include a specific option for modelling hydro with reservoir. This paper describes a method for modelling a hydropower plant with reservoir with HOMER by adapting an existing procedure used for modelling pumped storage. An example with two scenarios in southern Brazil is presented for illustrating and validating the method explained in this paper. The results validate the method by showing a direct correspondence between an equivalent battery and the reservoir. The refill of the reservoir, its power output as a function of the flow rate and installed hydropower capacity are effectively simulated, indicating an adequate representation of a hydropower plant with reservoir is possible with HOMER.
Hydropower, an energy source whose time has come again
NASA Astrophysics Data System (ADS)
1980-01-01
Recent price increases in imported oil demonstrate the urgency for the U.S. to rapidly develop its renewable resources. One such renewable resource for which technology is available now is hydropower. Studies indicate that hydropower potential, particularly at existing dam sites, can save the county hundreds of thousands of barrels of oil per day. But problems and constraints-economic, environmental, institutional, and operational-limit is full potential. Federal programs have had little impact on helping to bring hydro projects on line. Specifically, the Department of Energy's Small Hydro Program could do more to overcome hydro constraints and problems through an effective outreach program and more emphasis on demonstration projects.
Energy Efficiency and Renewable Energy Program. Bibliography, 1993 edition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaughan, K.H.
1993-06-01
The Bibliography contains listings of publicly available reports, journal articles, and published conference papers sponsored by the DOE Office of Energy Efficiency and Renewable Energy and published between 1987 and mid-1993. The topics of Bibliography include: analysis and evaluation; building equipment research; building thermal envelope systems and materials; district heating; residential and commercial conservation program; weatherization assistance program; existing buildings research program; ceramic technology project; alternative fuels and propulsion technology; microemulsion fuels; industrial chemical heat pumps; materials for advanced industrial heat exchangers; advanced industrial materials; tribology; energy-related inventions program; electric energy systems; superconducting technology program for electric energy systems; thermalmore » energy storage; biofuels feedstock development; biotechnology; continuous chromatography in multicomponent separations; sensors for electrolytic cells; hydropower environmental mitigation; environmental control technology; continuous fiber ceramic composite technology.« less
U.S. hydropower resource assessment for Idaho
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conner, A.M.; Francfort, J.E.
1998-08-01
The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based onmore » the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Idaho.« less
Data-Based Performance Assessments for the DOE Hydropower Advancement Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
March, Patrick; Wolff, Dr. Paul; Smith, Brennan T
2012-01-01
The U. S. Department of Energy s Hydropower Advancement Project (HAP) was initiated to characterize and trend hydropower asset conditions across the U.S.A. s existing hydropower fleet and to identify and evaluate the upgrading opportunities. Although HAP includes both detailed performance assessments and condition assessments of existing hydropower plants, this paper focuses on the performance assessments. Plant performance assessments provide a set of statistics and indices that characterize the historical extent to which each plant has converted the potential energy at a site into electrical energy for the power system. The performance metrics enable benchmarking and trending of performance acrossmore » many projects in a variety contexts (e.g., river systems, power systems, and water availability). During FY2011 and FY2012, assessments will be performed on ten plants, with an additional fifty plants scheduled for FY2013. This paper focuses on the performance assessments completed to date, details the performance assessment process, and describes results from the performance assessments.« less
43 CFR 45.1 - What is the purpose of this part, and to what license proceedings does it apply?
Code of Federal Regulations, 2010 CFR
2010-10-01
... prescriptions that the Department of the Interior (DOI) may develop for inclusion in a hydropower license issued... apply to recommendations that DOI may submit to FERC under FPA section 10(a) or (j), 16 U.S.C. 803(a... a hydropower license. Where DOI and either or both of these other Departments develop conditions or...
43 CFR 45.1 - What is the purpose of this part, and to what license proceedings does it apply?
Code of Federal Regulations, 2011 CFR
2011-10-01
... prescriptions that the Department of the Interior (DOI) may develop for inclusion in a hydropower license issued... apply to recommendations that DOI may submit to FERC under FPA section 10(a) or (j), 16 U.S.C. 803(a... a hydropower license. Where DOI and either or both of these other Departments develop conditions or...
National Hydroelectric Power Resources Study: Environmental Assessment. Volume 8
1981-09-01
hydropower developers were initiated as a result of the Public Utility Regulatory Policies Act ( PURPA ) and the Energy Security Act. Those acts and...1980a). With the passage of The Public Utilities Regulatory Policy Act ( PURPA ), DOE was authorized to promote small-scale hydropower. Under its Small...requested. In addition, OMB has decided not to request the $300 million construction loan appropriation authorized under the PURPA because OMB
Development activities, challenges and prospects for the hydropower sector in Austria
NASA Astrophysics Data System (ADS)
Wagner, Beatrice; Hauer, Christoph; Habersack, Helmut
2017-04-01
This contribution intends to give an overview of hydropower development activities in Austria and deepen the knowledge on actual strategies and planning documents. Thereby, the focus is on a climate and energy policy based perspective, also analyzing economic trends at the hydropower sector due to energy market changes in the last years. This includes a comparison with other political strategies and programs dealing with hydropower exploitation based on selected countries. With respect to technology developments, a concise review on technological innovations, such as hydrokinetic energy conversion systems, and new constructive designs of conventional hydropower plants in Austria will be given. Moreover, potential impacts on environment and aquatic ecosystems are described. Finally, key challenges and prospects will be identified and discussed.
Quadrennial Technology Review 2015: Technology Assessments--Hydropower
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sam Baldwin, Gilbert Bindewald, Austin Brown, Charles Chen, Kerry Cheung, Corrie Clark, Joe Cresko,
Hydropower has provided reliable and flexible base and peaking power generation in the United States for more than a century, contributing on average 10.5% of cumulative U.S. power sector net generation over the past six and one-half decades (1949–2013). It is the nation’s largest source of renewable electricity, with 79 GW of generating assets and 22 GW of pumped-storage assets in service, with hydropower providing half of all U.S. renewable power-sector generation (50% in 2014). In addition to this capacity, the U.S. Department of Energy (DOE) has identified greater than 80 GW of new hydropower resource potential: at least 5more » GW from rehabilitation and expansion of existing generating assets, up to 12 GW of potential at existing dams without power facilities, and over 60 GW of potential low-impact new development (LIND) in undeveloped stream reaches. However, despite this growth potential, hydropower capacity and production growth have stalled in recent years, with existing assets even experiencing decreases in capacity and production from lack of sustaining investments in infrastructure and increasing constraints on water use.« less
Methane emissions from a temperate agricultural reservoir
Dr. Jake Beaulieu was invited to present at the 2014 Green House Gas Emission Modeling workshop hosted by the International Energy Agency (IEA) Hydropower Implementing Agreement for Hydropower Technologies and Programs (IAHTP). The purpose of this workshop is to assemble an int...
1984-08-01
Mississippi River. 91 o In the event that the existing licensee, Ford Motor Company , or another non-Federal entity does not apply to FERC for rights to...interests. The existing hydropower plant and equipment are owned and operated by the Ford Motor Company . The existing four turbines generate a combined...Turbines (Ford Motor Company ) 51 Right (West) Abutment 51 Preliminary Screening of Alternatives 51 Conclusions of the Preliminary Comparative Review 53
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kroposki, Benjamin; Johnson, Brian; Zhang, Yingchen
What does it mean to achieve a 100% renewable grid? Several countries already meet or come close to achieving this goal. Iceland, for example, supplies 100% of its electricity needs with either geothermal or hydropower. Other countries that have electric grids with high fractions of renewables based on hydropower include Norway (97%), Costa Rica (93%), Brazil (76%), and Canada (62%). Hydropower plants have been used for decades to create a relatively inexpensive, renewable form of energy, but these systems are limited by natural rainfall and geographic topology. Around the world, most good sites for large hydropower resources have already beenmore » developed. So how do other areas achieve 100% renewable grids? Variable renewable energy (VRE), such as wind and solar photovoltaic (PV) systems, will be a major contributor, and with the reduction in costs for these technologies during the last five years, large-scale deployments are happening around the world.« less
Watering Down Barriers to Using Hydropower through Fisheries Research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ham, Ken
Much of our work on clean energy is targeted at improving performance of hydropower, the largest source of renewable energy in the Pacific Northwest and the nation. PNNL experts in hydropower—from computer scientists to biologists and engineers—are helping to optimize the efficiency and environmental performance of hydroelectric plants. The Columbia River is the nation’s most important hydropower resource, producing 40 percent of the nation’s hydroelectric generation and up to 70 percent of the region’s power. At PNNL, Fisheries Biologist Ken Ham and others are working with stakeholders in the Pacific Northwest, the Army Corps of Engineers and DOE to ensuremore » that this resource continues to provide its many benefits while setting a new standard for environmental sustainability. As aging turbines are replaced in existing hydropower dams, computational modeling and state-of-the-art fisheries research combine to aid the design of a next-generation hydro turbine that meets or exceeds current biological performance standards and produces more power.« less
A new framework for sustainable hydropower development project
NASA Astrophysics Data System (ADS)
Johan, Kartina; Turan, Faiz Mohd; Gani, Nur Syazwani Abdul
2018-03-01
This project studies on the establishment of a new framework for sustainable hydropower development. A hydropower development is listed as one of the prescribed activities under the Environmental Quality Order 1987. Thus, Environmental Impact Assessment (EIA) guidelines must be referred to comply with the Department of Environment (DoE) requirements. In order to execute EIA, an assessment tool that will be utilized in the final evaluation phase must be determined. The selected assessment tool that will be used is Systematic Sustainability Assessment(SSA) which is a new integrated tool to evaluate the sustainability performance. A pilot run is conducted in five different departments within the Energy Company to validate the efficiency of the SSA tool. The parameters to be evaluated are constructed aligned with the Sustainable Development Goals (SDG) to maintain the sustainability features. Consequently, the performance level of the sustainability with respect to People, Planet and Profit (3P’s) is able to be discovered during evaluation phase in the hydropower development for continuous improvement.
NASA Astrophysics Data System (ADS)
Olivares, M. A.; Gonzalez Cabrera, J. M., Sr.; Moreno, R.
2016-12-01
Operation of hydropower reservoirs in Chile is prescribed by an Independent Power System Operator. This study proposes a methodology that integrates power grid operations planning with basin-scale multi-use reservoir operations planning. The aim is to efficiently manage a multi-purpose reservoir, in which hydroelectric generation is competing with other water uses, most notably irrigation. Hydropower and irrigation are competing water uses due to a seasonality mismatch. Currently, the operation of multi-purpose reservoirs with substantial power capacity is prescribed as the result of a grid-wide cost-minimization model which takes irrigation requirements as constraints. We propose advancing in the economic co-optimization of reservoir water use for irrigation and hydropower at the basin level, by explicitly introducing the economic value of water for irrigation represented by a demand function for irrigation water. The proposed methodology uses the solution of a long-term grid-wide operations planning model, a stochastic dual dynamic program (SDDP), to obtain the marginal benefit function for water use in hydropower. This marginal benefit corresponds to the energy price in the power grid as a function of the water availability in the reservoir and the hydrologic scenarios. This function allows capture technical and economic aspects to the operation of hydropower reservoir in the power grid and is generated with the dual variable of the power-balance constraint, the optimal reservoir operation and the hydrologic scenarios used in SDDP. The economic value of water for irrigation and hydropower are then integrated into a basin scale stochastic dynamic program, from which stored water value functions are derived. These value functions are then used to re-optimize reservoir operations under several inflow scenarios.
NASA Astrophysics Data System (ADS)
Forrest, K.; Tarroja, B.; AghaKouchak, A.; Chiang, F.; Samuelsen, S.
2017-12-01
Spatial and temporal shifts in hydrological regimes predicted under climate change conditions have implications for the management of reservoirs and hydropower contributions to generation and ancillary services. California relies on large hydropower plants to provide flexible electricity generation, which will be increasingly important for supporting renewable resources. This study examines the impact of climate change on large hydropower generation in California. Four climate models for Representative Concentration Pathways (RCP) 4.5 and RCP 8.5 are utilized to evaluate the impact of the climate change conditions on (1) the magnitude and profile of hydropower generation and (2) the ability of hydropower to provide spinning reserve. Under both RCP scenarios, impacts are regionally dependent, with precipitation projected to increase in northern California and decrease in southern California for the ten-year period investigated (2046-2055). The overall result is a net increase in inflow into large hydropower units as a majority of the hydropower plants studied are located in the northern part of the state. Increased inflow is primarily driven by increased runoff during the winter and does not necessarily result in increased generation, as extreme events yield greater overall spillage, up to 45% of total inflow. Increased winter hydropower generation paired with increased reservoir constraints in summer result in an 11 to 18% decrease in spinning reserve potential across the year. Under high inflow conditions there is a decreased flexibility for choosing generation versus spinning reserve as water needs to be released, regardless. During summer, hydropower units providing spinning reserve experienced decreased inflow and lower reservoir levels compared to the historical baseline, resulting in decreased spinning reserve bidding potential. Decreased bidding, especially during summer periods at peak electricity demand, can result in greater demand for other dispatchable resources, such as natural gas turbines or emerging energy storage technologies, which has implications for electricity costs and overall grid emissions.
Influence of El Niño Southern Oscillation on global hydropower production
NASA Astrophysics Data System (ADS)
Ng, Jia Yi; Turner, Sean; Galelli, Stefano
2016-04-01
Hydropower contributes significantly to meeting the world's energy demand, accounting for at least 16% of total electrical output. Its role as a mature and cost competitive renewable energy source is expected to become increasingly important as the world transits to a low-carbon economy. A key component of hydropower production is runoff, which is highly dependent on precipitation and other climate variables. As such, it becomes critical to understand how the drivers of climate variability impact hydropower production. One globally-important driver is the El Niño Southern Oscillation (ENSO). While it is known that ENSO influences hydrological processes, the potential value of its associated teleconnection in design related tasks has yet to be explored at the global scale. Our work seeks to characterize the impact of ENSO on global hydropower production so as to quantify the potential for increased production brought about by incorporating climate information within reservoir operating models. We study over 1,500 hydropower reservoirs - representing more than half the world's hydropower capacity. A historical monthly reservoir inflow time series is assigned to each reservoir from a 0.5 degree gridded global runoff dataset. Reservoir operating rules are designed using stochastic dynamic programming, and storage dynamics are simulated to assess performance under the climate conditions of the 20th century. Results show that hydropower reservoirs in the United States, Brazil, Argentina, Australia, and Eastern China are strongly influenced by ENSO episodes. Statistically significant lag correlations between ENSO indicators and hydropower production demonstrate predictive skill with lead times up to several months. Our work highlights the potential for using these indicators to increase the contribution of existing hydropower plants to global energy supplies.
Fuzzy multiobjective models for optimal operation of a hydropower system
NASA Astrophysics Data System (ADS)
Teegavarapu, Ramesh S. V.; Ferreira, André R.; Simonovic, Slobodan P.
2013-06-01
Optimal operation models for a hydropower system using new fuzzy multiobjective mathematical programming models are developed and evaluated in this study. The models use (i) mixed integer nonlinear programming (MINLP) with binary variables and (ii) integrate a new turbine unit commitment formulation along with water quality constraints used for evaluation of reservoir downstream impairment. Reardon method used in solution of genetic algorithm optimization problems forms the basis for development of a new fuzzy multiobjective hydropower system optimization model with creation of Reardon type fuzzy membership functions. The models are applied to a real-life hydropower reservoir system in Brazil. Genetic Algorithms (GAs) are used to (i) solve the optimization formulations to avoid computational intractability and combinatorial problems associated with binary variables in unit commitment, (ii) efficiently address Reardon method formulations, and (iii) deal with local optimal solutions obtained from the use of traditional gradient-based solvers. Decision maker's preferences are incorporated within fuzzy mathematical programming formulations to obtain compromise operating rules for a multiobjective reservoir operation problem dominated by conflicting goals of energy production, water quality and conservation releases. Results provide insight into compromise operation rules obtained using the new Reardon fuzzy multiobjective optimization framework and confirm its applicability to a variety of multiobjective water resources problems.
NASA Astrophysics Data System (ADS)
Kentel, E.; Cetinkaya, M. A.
2013-12-01
Global issues such as population increase, power supply crises, oil prices, social and environmental concerns have been forcing countries to search for alternative energy sources such as renewable energy to satisfy the sustainable development goals. Hydropower is the most common form of renewable energy in the world. Hydropower does not require any fuel, produces relatively less pollution and waste and it is a reliable energy source with relatively low operating cost. In order to estimate the average annual energy production of a hydropower plant, sufficient and dependable streamflow data is required. The goal of this study is to investigate impact of streamflow data on annual energy generation of Balkusan HEPP which is a small run-of-river hydropower plant at Karaman, Turkey. Two different stream gaging stations are located in the vicinity of Balkusan HEPP and these two stations have different observation periods: one from 1986 to 2004 and the other from 2000 to 2009. These two observation periods show different climatic characteristics. Thus, annual energy estimations based on data from these two different stations differ considerably. Additionally, neither of these stations is located at the power plant axis, thus streamflow observations from these two stream gaging stations need to be transferred to the plant axis. This requirement introduces further errors into energy estimations. Impact of different streamflow data and transfer of streamflow observations to plant axis on annual energy generation of a small hydropower plant is investigated in this study.
Effects of Climate Change on Federal Hydropower. Report to Congress
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This is a formal Department of Energy report to Congress. It outlines the findings of an assessment directed by Congress in Section 9505 of the SECURE Water Act of 2009 (Public Law 111-11), the US Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities.
Li, Ji-Qing; Zhang, Yu-Shan; Ji, Chang-Ming; Wang, Ai-Jing; Lund, Jay R
2013-01-01
This paper examines long-term optimal operation using dynamic programming for a large hydropower system of 10 reservoirs in Northeast China. Besides considering flow and hydraulic head, the optimization explicitly includes time-varying electricity market prices to maximize benefit. Two techniques are used to reduce the 'curse of dimensionality' of dynamic programming with many reservoirs. Discrete differential dynamic programming (DDDP) reduces the search space and computer memory needed. Object-oriented programming (OOP) and the ability to dynamically allocate and release memory with the C++ language greatly reduces the cumulative effect of computer memory for solving multi-dimensional dynamic programming models. The case study shows that the model can reduce the 'curse of dimensionality' and achieve satisfactory results.
The influence of climate change on Tanzania's hydropower sustainability
NASA Astrophysics Data System (ADS)
Sperna Weiland, Frederiek; Boehlert, Brent; Meijer, Karen; Schellekens, Jaap; Magnell, Jan-Petter; Helbrink, Jakob; Kassana, Leonard; Liden, Rikard
2015-04-01
Economic costs induced by current climate variability are large for Tanzania and may further increase due to future climate change. The Tanzanian National Climate Change Strategy addressed the need for stabilization of hydropower generation and strengthening of water resources management. Increased hydropower generation can contribute to sustainable use of energy resources and stabilization of the national electricity grid. To support Tanzania the World Bank financed this study in which the impact of climate change on the water resources and related hydropower generation capacity of Tanzania is assessed. To this end an ensemble of 78 GCM projections from both the CMIP3 and CMIP5 datasets was bias-corrected and down-scaled to 0.5 degrees resolution following the BCSD technique using the Princeton Global Meteorological Forcing Dataset as a reference. To quantify the hydrological impacts of climate change by 2035 the global hydrological model PCR-GLOBWB was set-up for Tanzania at a resolution of 3 minutes and run with all 78 GCM datasets. From the full set of projections a probable (median) and worst case scenario (95th percentile) were selected based upon (1) the country average Climate Moisture Index and (2) discharge statistics of relevance to hydropower generation. Although precipitation from the Princeton dataset shows deviations from local station measurements and the global hydrological model does not perfectly reproduce local scale hydrographs, the main discharge characteristics and precipitation patterns are represented well. The modeled natural river flows were adjusted for water demand and irrigation within the water resources model RIBASIM (both historical values and future scenarios). Potential hydropower capacity was assessed with the power market simulation model PoMo-C that considers both reservoir inflows obtained from RIBASIM and overall electricity generation costs. Results of the study show that climate change is unlikely to negatively affect the average potential of future hydropower production; it will likely make hydropower more profitable. Yet, the uncertainty in climate change projections remains large and risks are significant, adaptation strategies should ideally consider a worst case scenario to ensure robust power generation. Overall a diversified power generation portfolio, anchored in hydropower and supported by other renewables and fossil fuel-based energy sources, is the best solution for Tanzania
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connor, Patrick; Rugani, Kelsey; West, Anna
On behalf of the U.S. Department of Energy (DOE) Wind and Water Power Technology Office (WWPTO), Oak Ridge National Laboratory (ORNL), hosted a day and half long workshop on November 5 and 6, 2015 in the Washington, D.C. metro area to discuss cost reduction opportunities in the development of hydropower projects. The workshop had a further targeted focus on the costs of small, low-head1 facilities at both non-powered dams (NPDs) and along undeveloped stream reaches (also known as New Stream-Reach Development or “NSD”). Workshop participants included a cross-section of seasoned experts, including project owners and developers, engineering and construction experts,more » conventional and next-generation equipment manufacturers, and others to identify the most promising ways to reduce costs and achieve improvements for hydropower projects.« less
State Models to Incentivize and Streamline Small Hydropower Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curtis, Taylor; Levine, Aaron; Johnson, Kurt
In 2016, the hydropower fleet in the United States produced more than 6 percent (approximately 265,829 gigawatt-hours [GWh]) of the total net electricity generation. The median-size hydroelectric facility in the United States is 1.6 MW and 75 percent of total facilities have a nameplate capacity of 10 MW or less. Moreover, the U.S. Department of Energy's Hydropower Vision study identified approximately 79 GW hydroelectric potential beyond what is already developed. Much of the potential identified is at low-impact new stream-reaches, existing conduits, and non-powered dams with a median project size of 10 MW or less. To optimize the potential andmore » value of small hydropower development, state governments are crafting policies that provide financial assistance and expedite state and federal review processes for small hydroelectric projects. This report analyzes state-led initiatives and programs that incentivize and streamline small hydroelectric development.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-25
... hydropower near the town of Ravenscroft, on Doe Creek, in White and Putnam Counties, Tennessee. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any...
Optimizing Wind And Hydropower Generation Within Realistic Reservoir Operating Policy
NASA Astrophysics Data System (ADS)
Magee, T. M.; Clement, M. A.; Zagona, E. A.
2012-12-01
Previous studies have evaluated the benefits of utilizing the flexibility of hydropower systems to balance the variability and uncertainty of wind generation. However, previous hydropower and wind coordination studies have simplified non-power constraints on reservoir systems. For example, some studies have only included hydropower constraints on minimum and maximum storage volumes and minimum and maximum plant discharges. The methodology presented here utilizes the pre-emptive linear goal programming optimization solver in RiverWare to model hydropower operations with a set of prioritized policy constraints and objectives based on realistic policies that govern the operation of actual hydropower systems, including licensing constraints, environmental constraints, water management and power objectives. This approach accounts for the fact that not all policy constraints are of equal importance. For example target environmental flow levels may not be satisfied if it would require violating license minimum or maximum storages (pool elevations), but environmental flow constraints will be satisfied before optimizing power generation. Additionally, this work not only models the economic value of energy from the combined hydropower and wind system, it also captures the economic value of ancillary services provided by the hydropower resources. It is recognized that the increased variability and uncertainty inherent with increased wind penetration levels requires an increase in ancillary services. In regions with liberalized markets for ancillary services, a significant portion of hydropower revenue can result from providing ancillary services. Thus, ancillary services should be accounted for when determining the total value of a hydropower system integrated with wind generation. This research shows that the end value of integrated hydropower and wind generation is dependent on a number of factors that can vary by location. Wind factors include wind penetration level, variability due to geographic distribution of wind resources, and forecast error. Electric power system factors include the mix of thermal generation resources, available transmission, demand patterns, and market structures. Hydropower factors include relative storage capacity, reservoir operating policies and hydrologic conditions. In addition, the wind, power system, and hydropower factors are often interrelated because stochastic weather patterns can simultaneously influence wind generation, power demand, and hydrologic inflows. One of the central findings is that the sensitivity of the model to changes cannot be performed one factor at a time because the impact of the factors is highly interdependent. For example, the net value of wind generation may be very sensitive to changes in transmission capacity under some hydrologic conditions, but not at all under others.
RAPID Toolkit Creates Smooth Flow Toward New Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Levine, Aaron; Young, Katherine
2016-07-01
Uncertainty about the duration and outcome of the permitting process has historically been seen as a deterrent to investment in renewable energy projects, including new hydropower projects. What if the process were clearer, smoother, faster? That's the purpose of the Regulatory and Permitting Information Desktop (RAPID) Toolkit, developed by the National Renewable Energy Laboratory (NREL) with funding from the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy and the Western Governors' Association. Now, the RAPID Toolkit is being expanded to include information about developing and permitting hydropower projects, with initial outreach and information gathering occurring duringmore » 2015.« less
Assessment of the Effects of Climate Change on Federal Hydropower
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sale, Michael J.; Shih-Chieh, Kao; Ashfaq, Moetasim
As directed by Congress in Section 9505 of the SECURE Water Act of 2009 (Public Law 111-11), the US Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities. This Oak Ridge National Laboratory report, referred to as the “9505 Assessment,” describes the technical basis for the report to Congress that was called for in the SECURE Water Act.
Evaluation of Application Space Expansion for the Sensor Fish
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeRolph, Christopher R.; Bevelhimer, Mark S.
The Pacific Northwest National Laboratory has developed an instrument known as the sensor fish that can be released into downstream passage routes at hydropower facilities to collect data on the physical conditions that a fish might be exposed to during passage through a turbine. The US Department of Energy Wind and Water Power Program sees value in expanding the sensor fish application space beyond large Kaplan turbines in the northwest United States to evaluate conditions to which a greater variety of fish species are exposed. Development of fish-friendly turbines requires an understanding of both physical passage conditions and biological responsesmore » to those conditions. Expanding the use of sensor fish into other application spaces will add to the knowledge base of physical passage conditions and could also enhance the use of sensor fish as a site-specific tool in mitigating potential impacts to fish populations from hydropower. The Oak Ridge National Laboratory (ORNL) National Hydropower Assessment Program (NHAAP) database contains hydropower facility characteristics that, along with national fish distribution data, were used to evaluate potential interactions between fish species and project characteristics related to downstream passage issues. ORNL developed rankings for the turbine types in the NHAAP database in terms of their potential to impact fish through injury or mortality during downstream turbine passage. National-scale fish distributions for 31 key migratory species were spatially intersected with hydropower plant locations to identify facilities where turbines with a high threat to fish injury or mortality overlap with the potential range of a sensitive fish species. A dataset was produced that identifies hydropower facilities where deployment of the sensor fish technology might be beneficial in addressing issues related to downstream fish passage. The dataset can be queried to target specific geographic regions, fish species, license expiration dates, generation capacity levels, ownership characteristics, turbine characteristics, or any combination of these metrics.« less
Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gasper, John R.; Veselka, Thomas D.; Mahalik, Matthew R.
2014-05-19
This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in moremore » energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.« less
Decision Support System for Reservoir Management and Operation in Africa
NASA Astrophysics Data System (ADS)
Navar, D. A.
2016-12-01
Africa is currently experiencing a surge in dam construction for flood control, water supply and hydropower production, but ineffective reservoir management has caused problems in the region, such as water shortages, flooding and loss of potential hydropower generation. Our research aims to remedy ineffective reservoir management by developing a novel Decision Support System(DSS) to equip water managers with a technical planning tool based on the state of the art in hydrological sciences. The DSS incorporates a climate forecast model, a hydraulic model of the watershed, and an optimization model to effectively plan for the operation of a system of cascade large-scale reservoirs for hydropower production, while treating water supply and flood control as constraints. Our team will use the newly constructed hydropower plants in the Omo Gibe basin of Ethiopia as the test case. Using the basic HIDROTERM software developed in Brazil, the General Algebraic Modeling System (GAMS) utilizes a combination of linear programing (LP) and non-linear programming (NLP) in conjunction with real time hydrologic and energy demand data to optimize the monthly and daily operations of the reservoir system. We compare the DSS model results with the current reservoir operating policy used by the water managers of that region. We also hope the DSS will eliminate the current dangers associated with the mismanagement of large scale water resources projects in Africa.
Development of the water-lubricated thrust bearing of the hydraulic turbine generator
NASA Astrophysics Data System (ADS)
Inoue, K.; Deguchi, K.; Okude, K.; Fujimoto, R.
2012-11-01
In hydropower plant, a large quantities of turbine oil is used as machine control pressure oil and lubricating oil. If the oil leak out from hydropower plant, it flows into a river. And such oil spill has an adverse effect on natural environment because the oil does not degrade easily. Therefore the KANSAI and Hitachi Mitsubishi Hydro developed the water-lubricated thrust bearing for vertical type hydraulic turbine generator. The water-lubricated bearing has advantages in risk avoidance of river pollution because it does not need oil. For proceeding the development of the water-lubricated thrust bearing, we studied following items. The first is the examination of the trial products of water lubricating liquid. The second is the study of bearing structure which can satisfy bearing performance such as temperature characteristic and so on. The third is the mock-up testing for actual application in the future. As a result, it was found that the water-lubricated thrust bearing was technically applicable to actual equipments.
The Second Assessment of the Effects of Climate Change on Federal Hydropower
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kao, Shih-Chieh; Ashfaq, Moetasim; Naz, Bibi S.
Hydropower is a key contributor to the US renewable energy portfolio due to its established development history and the diverse benefits it provides to the electric power system. Ensuring the sustainable operation of existing hydropower facilities is of great importance to the US renewable energy portfolio and the reliability of electricity grid. As directed by Congress in Section 9505 of the SECURE Water Act (SWA) of 2009 (Public Law 111-11), the US Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, has prepared a second quinquennial report on examining the potential effectsmore » of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities. This Oak Ridge National Laboratory (ORNL) Technical Memorandum, referred to as the 9505 assessment, describes the technical basis for the report to Congress that was called for in the SWA. To evaluate the potential climate change effects on 132 federal hydropower plants across the entire US, a spatially consistent assessment approach is designed to enable an interregional comparison. This assessment uses a series of models and methods with different spatial resolutions to gradually downscale the global climate change signals into watershed-scale hydrologic projections to support hydropower impact assessment. A variety of historic meteorological and hydrologic observations, hydropower facility characteristics, and geospatial datasets is collected to support model development, calibration, and verification. Among most of the federal hydropower plants throughout the US, the most important climate change effect on hydrology is likely to be the trend toward earlier snowmelt and change of runoff seasonality. Under the projections of increasing winter/spring runoff and decreasing summer/fall runoff, water resource managers may need to consider different water use allocations. With the relatively large storage capacity in the most of the US federal hydropower reservoirs, the system is likely to be able to absorb part of the runoff variability and hence may continue to provide stable annual hydropower generation in the projected near-term and midterm future periods. Nevertheless, the findings are based on the assumption that there is no significant change in the future installed capacity and operation. The issues of aging infrastructures, competing water demand, and environmental requirements may reduce the system s ability to mitigate runoff variability and increase the difficulty of future operation. These issues are not quantitatively analyzed in this study. This study presents a regional assessment at each of the eighteen PMA study areas. This generalized approach allows for spatial consistency throughout all study areas, enabling policymakers to evaluate potential climate change impacts across the entire federal hydropower fleet. This effort is expected to promote better understanding of the sensitivity of federal power plants to water availability and provides a basis for planning future actions that will enable adaptation to climate variability and change.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kao, Shih-Chieh; McManamay, Ryan A; Stewart, Kevin M
2014-04-01
The rapid development of multiple national geospatial datasets related to topography, hydrology, and environmental characteristics in the past decade have provided new opportunities for the refinement of hydropower resource potential from undeveloped stream-reaches. Through 2011 to 2013, the Oak Ridge National Laboratory (ORNL) was tasked by the Department of Energy (DOE) Water Power Program to evaluate the new stream-reach development (NSD) resource potential for more than 3 million US streams. A methodology was designed that contains three main components: (1) identification of stream-reaches with high energy density, (2) topographical analysis of stream-reaches to estimate inundated surface area and reservoir storage,more » and (3) environmental attribution to spatially join information related to the natural ecological systems, social and cultural settings, policies, management, and legal constraints to stream-reaches of energy potential. An initial report on methodology (Hadjerioua et al., 2013) was later reviewed and revised based on the comments gathered from two peer review workshops. After implementing the assessment across the entire United States, major findings were summarized in this final report. The estimated NSD capacity and generation, including both higher-energy-density (>1 MW per reach) and lower-energy-density (<1 MW per reach) stream-reaches is 84.7 GW, around the same size as the existing US conventional hydropower nameplate capacity (79.5 GW; NHAAP, 2013). In terms of energy, the total undeveloped NSD generation is estimated to be 460 TWh/year, around 169% of average 2002 2011 net annual generation from existing conventional hydropower plants (272 TWh/year; EIA, 2013). Given the run-of-river assumption, NSD stream-reaches have higher capacity factors (53 71%), especially compared with conventional larger-storage peaking-operation projects that usually have capacity factors of around 30%. The highest potential is identified in the Pacific Northwest Region (32%), followed by Missouri Region (15%) and California Region (9%). In terms of states, the highest potential is found in Oregon, Washington, and Idaho, the three states in the Pacific Northwest, followed by California, Alaska, Montana, and Colorado. In addition to the resource potential, abundant environmental attributes were also organized and attributed to the identified stream-reaches to support further hydropower market analysis. The prevalence of environmental variables and proportion of capacity from stream-reaches intersecting environmental variables varied according to hydrologic region. Detailed NSD findings are organized by hydrologic regions and presented in each chapter of this report.« less
A Prospective Analysis of the Costs, Benefits, and Impacts of U.S. Renewable Portfolio Standards
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mai, Trieu; Wiser, Ryan; Barbose, Galen
As states have gained experience with renewable portfolio standards (RPS) policies, many have made significant revisions to existing programs. In 2015 and 2016, seven states raised and extended their final RPS targets, while another state enacted a new RPS policy (Barbose 2016b). Interest in expanding and strengthening state RPS programs may continue, while efforts like recent proposals in many states to repeal or freeze existing RPS policies may also persist. In either context, questions about the potential costs, benefits, and other impacts of RPS programs are usually central to the decision-making process. This report follows on previous analyses that havemore » focused on the historical costs, benefits, and other impacts of existing state RPS programs (Heeter et al. 2014; Wiser et al. 2016a). This report examines RPS outcomes prospectively, considering both current RPS policies as well as a potential expansion of those policies. The goal of this work is to provide a consistent and independent analytical methodology for that examination. This analysis relies on National Renewable Energy Laboratory’s (NREL’s) Regional Energy Deployment System (ReEDS) model to estimate changes to the U.S. electric power sector across a number of scenarios and sensitivity cases, focusing on the 2015–2050 timeframe. Based on those modeled results, we evaluate the costs, benefits, and other impacts of renewable energy contributing to RPS compliance using the suite of methods employed in a number of recent studies sponsored by the U.S. Department of Energy (DOE): a report examining retrospective benefits and impacts of RPS programs (Wiser et al. 2016a), the Wind Vision report (DOE 2015), the On the Path to SunShot report focusing on environmental benefits (Wiser et al. 2016b), and the Hydropower Vision report (DOE 2016).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Nathan; Grue, Nicholas W; Rosenlieb, Evan
The purpose of this report is to support the Lao Ministry of Energy and Mines in assessing the technical potential of domestic energy resources for utility scale electricity generation in the Lao PDR. Specifically, this work provides assessments of technical potential, and associated maps of developable areas, for energy technologies of interest. This report details the methodology, assumptions, and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This work concentrates on domestic energy resourcesmore » for utility-scale electricity generation and considers solar photovoltaic, wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources. This report is the second output of the Energy Alternatives Study for the Lao PDR, a collaboration led by the Lao Ministry of Energy and Mines and the United States Agency for International Development under the auspices of the Smart Infrastructure for the Mekong program. The Energy Alternatives Study is composed of five successive tasks that collectively support the project's goals. This work is focused on Task 2 - Assess technical potential of domestic energy resources for electricity generation. The work was carried out by a team from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) in collaboration with the Lao Ministry of Energy and Mines and other Lao power sector stakeholders. and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This work concentrates on domestic energy resources for utility-scale electricity generation and considers solar photovoltaic, wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources.« less
Brief reconnaissance study for the addition of hydropower for Lake Manatee Dam, Bradenton, Florida
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gebhard, T.G. Jr.
1983-02-24
The following are presented: summary sheet; site description; business data; environmental, institutional, and safety data; plant characteristics and power potential; project economics; and photographs. It was concluded that the development of hydroelectric power at this site does not appear to be economically feasible. (MHR)
Trade-offs and Opportunities in the Nexus of Energy and Water-for-Food
NASA Astrophysics Data System (ADS)
Rosegrant, M. W.
2015-12-01
The world economy is under pressure for greater, more efficient and more sustainable use of natural resources to meet complementary and competing objectives in the energy, water, and food sectors. Increasing national, regional, and seasonal water scarcities in much of the world pose severe challenges for national governments, the international development community, and ultimately, for individual water users. This presentation assesses the nexus between energy and water, with an emphasis on the interactions and trade-offs between energy and water for food production. It examines the impact of biofuel production on water quantity and quality, and the potential for hydropower potential to meet energy challenges while expanding irrigation water supplies and food production potential, thereby enhancing global food security. Biofuel production affects both water quantity and quality. Expanding production of biofuels—through either crop-based production systems or direct biomass production—can significantly increase demand for water as more acreage is planted or the crop mix begins to favor thirstier crops; water demand for bio-refineries creates additional competition with agricultural water use. Water quality can also be adversely affected by increased acreage for fertilizer-intensive crops, such as maize or sugarcane, which can result in increased nitrate run-off and soil erosion. Hydropower has become a relatively forgotten part of the energy-water security picture that deserves renewed attention. Unlike biofuels, hydropower does not normally compete with agricultural water. Instead, development of hydropower could complement food production by developing dam structures and power that also provide irrigation water and support its distribution for growing food crops. But balanced hydropower policies require consideration of potential trade-offs with environmental and social impacts.
PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Pasha, MD Fayzul K; Stewart, Kevin M
2012-07-01
Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained bymore » state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
News stories about conventional hydropower and marine and hydrokinetic technologies from the U.S. Department of Energy, the Office of Energy Efficiency and Renewable Energy, the Wind and Water Power Program, and other federal agencies.
Si, Yuan; Li, Xiang; Yin, Dongqin; Liu, Ronghua; Wei, Jiahua; Huang, Yuefei; Li, Tiejian; Liu, Jiahong; Gu, Shenglong; Wang, Guangqian
2018-01-01
The hydropower system in the Upper Yellow River (UYR), one of the largest hydropower bases in China, plays a vital role in the energy structure of the Qinghai Power Grid. Due to management difficulties, there is still considerable room for improvement in the joint operation of this system. This paper presents a general LINGO-based integrated framework to study the operation of the UYR hydropower system. The framework is easy to use for operators with little experience in mathematical modeling, takes full advantage of LINGO's capabilities (such as its solving capacity and multi-threading ability), and packs its three layers (the user layer, the coordination layer, and the base layer) together into an integrated solution that is robust and efficient and represents an effective tool for data/scenario management and analysis. The framework is general and can be easily transferred to other hydropower systems with minimal effort, and it can be extended as the base layer is enriched. The multi-objective model that represents the trade-off between power quantity (i.e., maximum energy production) and power reliability (i.e., firm output) of hydropower operation has been formulated. With equivalent transformations, the optimization problem can be solved by the nonlinear programming (NLP) solvers embedded in the LINGO software, such as the General Solver, the Multi-start Solver, and the Global Solver. Both simulation and optimization are performed to verify the model's accuracy and to evaluate the operation of the UYR hydropower system. A total of 13 hydropower plants currently in operation are involved, including two pivotal storage reservoirs on the Yellow River, which are the Longyangxia Reservoir and the Liujiaxia Reservoir. Historical hydrological data from multiple years (2000-2010) are provided as input to the model for analysis. The results are as follows. 1) Assuming that the reservoirs are all in operation (in fact, some reservoirs were not operational or did not collect all of the relevant data during the study period), the energy production is estimated as 267.7, 357.5, and 358.3×108 KWh for the Qinghai Power Grid during dry, normal, and wet years, respectively. 2) Assuming that the hydropower system is operated jointly, the firm output can reach 3110 MW (reliability of 100%) and 3510 MW (reliability of 90%). Moreover, a decrease in energy production from the Longyangxia Reservoir can bring about a very large increase in firm output from the hydropower system. 3) The maximum energy production can reach 297.7, 363.9, and 411.4×108 KWh during dry, normal, and wet years, respectively. The trade-off curve between maximum energy production and firm output is also provided for reference.
Si, Yuan; Liu, Ronghua; Wei, Jiahua; Huang, Yuefei; Li, Tiejian; Liu, Jiahong; Gu, Shenglong; Wang, Guangqian
2018-01-01
The hydropower system in the Upper Yellow River (UYR), one of the largest hydropower bases in China, plays a vital role in the energy structure of the Qinghai Power Grid. Due to management difficulties, there is still considerable room for improvement in the joint operation of this system. This paper presents a general LINGO-based integrated framework to study the operation of the UYR hydropower system. The framework is easy to use for operators with little experience in mathematical modeling, takes full advantage of LINGO’s capabilities (such as its solving capacity and multi-threading ability), and packs its three layers (the user layer, the coordination layer, and the base layer) together into an integrated solution that is robust and efficient and represents an effective tool for data/scenario management and analysis. The framework is general and can be easily transferred to other hydropower systems with minimal effort, and it can be extended as the base layer is enriched. The multi-objective model that represents the trade-off between power quantity (i.e., maximum energy production) and power reliability (i.e., firm output) of hydropower operation has been formulated. With equivalent transformations, the optimization problem can be solved by the nonlinear programming (NLP) solvers embedded in the LINGO software, such as the General Solver, the Multi-start Solver, and the Global Solver. Both simulation and optimization are performed to verify the model’s accuracy and to evaluate the operation of the UYR hydropower system. A total of 13 hydropower plants currently in operation are involved, including two pivotal storage reservoirs on the Yellow River, which are the Longyangxia Reservoir and the Liujiaxia Reservoir. Historical hydrological data from multiple years (2000–2010) are provided as input to the model for analysis. The results are as follows. 1) Assuming that the reservoirs are all in operation (in fact, some reservoirs were not operational or did not collect all of the relevant data during the study period), the energy production is estimated as 267.7, 357.5, and 358.3×108 KWh for the Qinghai Power Grid during dry, normal, and wet years, respectively. 2) Assuming that the hydropower system is operated jointly, the firm output can reach 3110 MW (reliability of 100%) and 3510 MW (reliability of 90%). Moreover, a decrease in energy production from the Longyangxia Reservoir can bring about a very large increase in firm output from the hydropower system. 3) The maximum energy production can reach 297.7, 363.9, and 411.4×108 KWh during dry, normal, and wet years, respectively. The trade-off curve between maximum energy production and firm output is also provided for reference. PMID:29370206
NASA Astrophysics Data System (ADS)
Rheinheimer, David Emmanuel
Hydropower systems and other river regulation often harm instream ecosystems, partly by altering the natural flow and temperature regimes that ecosystems have historically depended on. These effects are compounded at regional scales. As hydropower and ecosystems are increasingly valued globally due to growing values for clean energy and native species as well as and new threats from climate warming, it is important to understand how climate warming might affect these systems, to identify tradeoffs between different water uses for different climate conditions, and to identify promising water management solutions. This research uses traditional simulation and optimization to explore these issues in California's upper west slope Sierra Nevada mountains. The Sierra Nevada provides most of the water for California's vast water supply system, supporting high-elevation hydropower generation, ecosystems, recreation, and some local municipal and agricultural water supply along the way. However, regional climate warming is expected to reduce snowmelt and shift runoff to earlier in the year, affecting all water uses. This dissertation begins by reviewing important literature related to the broader motivations of this study, including river regulation, freshwater conservation, and climate change. It then describes three substantial studies. First, a weekly time step water resources management model spanning the Feather River watershed in the north to the Kern River watershed in the south is developed. The model, which uses the Water Evaluation And Planning System (WEAP), includes reservoirs, run-of-river hydropower, variable head hydropower, water supply demand, and instream flow requirements. The model is applied with a runoff dataset that considers regional air temperature increases of 0, 2, 4 and 6 °C to represent historical, near-term, mid-term and far-term (end-of-century) warming. Most major hydropower turbine flows are simulated well. Reservoir storage is also generally well simulated, mostly limited by the accuracy of inflow hydrology. System-wide hydropower generation is reduced by 9% with 6 °C warming. Most reductions in hydropower generation occur in the highly productive watersheds in the northern Sierra Nevada. The central Sierra Nevada sees less reduction in annual runoff and can adapt better to changes in runoff timing. Generation in southern watersheds is expected to decrease. System-wide, reservoirs adapt to capture earlier runoff, but mostly decrease in mean reservoir storage with warming due to decreasing annual runoff. Second, a multi-reservoir optimization model is developed using linear programming that considers the minimum instream flows (MIFs) and weekly down ramp rates (DRRs) in the Upper Yuba River in the northern Sierra Nevada. Weekly DRR constraints are used to mimic spring snowmelt flows, which are particularly important for downstream ecosystems in the Sierra Nevada but are currently missing due to the influence of dams. Trade-offs between MIFs, DRRs and hydropower are explored with air temperature warming (+0, 2, 4 and 6 °C). Under base case operations, mean annual hydropower generation increases slightly with 2 °C warming and decreases slightly with 6 °C warming. With 6 °C warming, the most ecologically beneficial MIF and DRR reduce hydropower generation 5.5% compared to base case operations and a historical climate, which has important implications for re-licensing the hydropower project. Finally, reservoir management for downstream temperatures is explored using a linear programming model to optimally release water from a reservoir using selective withdrawal. The objective function is to minimize deviations from desired downstream temperatures, which are specified to mimic the natural temperature regime in the river. One objective of this study was to develop a method that can be readily integrated into a basin-scale multi-reservoir optimization model using a network representation of system features. The second objective was to explore the potential use of reservoirs to maintain an ideal stream temperature regime to ameliorate the temperature effects of climate warming of air temperature. For proof-of-concept, the model is applied to Lake Spaulding in the Upper Yuba River. With selective withdrawal, the model hedges the release of cold water to decrease summer stream temperatures, but at a cost of warmer stream temperatures in the winter. Results also show that selective withdrawal can reduce, but not eliminate, the temperature effects of climate warming. The model can be extended to include other nearby reservoirs to optimally manage releases from multiple reservoirs for multiple downstream temperature targets in a highly interconnected system. While the outcomes of these studies contribute to our understanding of reservoir management and hydropower at the intersection of energy, water management, ecosystems, and climate warming, there are many opportunities to improve this work. Promising options for improving and building on the collective utility of these studies are presented.
Regulation of hydropower: Who is in charge?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Molm, J.
1995-12-31
The regulatory, legislative and judicial branches of government all have played a role in twisting and changing FERC`s authority over hydropower. At times authority over hydropower is kept at FERC; at other times it is granted to state or federal agencies. At present, decisions are driven by competing uses of water that require differing flows or quantities of water. It is the highest and best use of the f lows and the quantities that will dictate whether water quantities are used for hydropower or fish habitat. However, that is not where it all started. In First Iowa, the Federal Powermore » Commission ({open_quotes}FPC{close_quotes}) (predecessor to FERC) dismissed a license application solely on the ground of the failure of the license applicant to comply with Iowa statutes. Iowa law provided that no dam could be constructed or operated unless a permit had been issued by a state agency. The U.S. Supreme Court reversed the Commission deciding that the Iowa statute would vest in an Iowa agency a veto power over a federal project and thereby subordinate the FPC`s comprehensive planning obligation to state control. The Court ruled that there is a separation of those subjects that are under the jurisdiction of the states from those subjects that the Constitution delegates to the United States and over which Congress vests the FPC with authority to act. The Court stated that this {open_quotes}duality does not require two agencies to share in the final decision of the same issue.{close_quotes} Although the Supreme Court ruled that federal jurisdiction is preeminent, it should be underscored that it was the FPC`s decision to defer to state authority in the first place. The Supreme Court decision is a determinations that flows for hydropower purposes should be made by the FPC under authority of the Federal Power Act.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-26
... Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The project would be... ready for environmental analysis at this time. l. The proposed 2.0-megawatt Inglis Hydropower Project...
Hydropower Baseline Cost Modeling
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connor, Patrick W.; Zhang, Qin Fen; DeNeale, Scott T.
Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gapsmore » in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.« less
Hydropower Baseline Cost Modeling, Version 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connor, Patrick W.
Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gapsmore » in publically available hydropower cost estimating tools that can support the national-scale evaluation of hydropower resources.« less
Ergonomics program management in Tucuruí Hydropower Plant using TPM methodology.
Santos, R M; Sassi, A C; Sá, B M; Miguez, S A; Pardauil, A A
2012-01-01
This paper aims to present the benefits achieved in the ergonomics process management with the use of the TPM methodology (Total Productive Maintenance) in Tucuruí Hydropower Plant. The methodology is aligned with the corporate guidelines, moreover with the Strategic Planning of the company, it is represented in the TPM Pillars including the Health Pillar in which is inserted the ergonomics process. The results of the ergonomic actions demonstrated a 12% reduction over the absenteeism rate due to musculoskeletal disorders, solving 77,0% of ergonomic non-conformities, what favored the rise of the Organizational Climate in 44,8%, impacting on the overall performance of the company. Awards confirmed the success of the work by the achievement of the Award for TPM Excellence in 2001, Award for Excellence in Consistent TPM Commitment in 2009 and more recently the Special Award for TPM Achievement, 2010. The determination of the high rank administration and workers, allied with the involvement/dynamism of Pillars, has assured the success of this management practice in Tucuruí Hydropower Plant.
Application procedures for hydropower licenses, exemptions, and preliminary permits
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-04-01
This document provides essential information regarding the FERC's regulations and procedures for filing an application with the Commission for hydropower licenses, exemptions and preliminary permits. Each section is page numbered with a roman numeral followed by consecutive arabic numbering. The appendices are page numbered with an alphabetical prefix and consecutve page numbering within each section. The first section of this book contains background descriptions of the Commission's authority and regulations and serves as an introduction to the Commission's hydropower licensing program. Two general tables follow this introductory text and provide a quick reference to the types of applications and themore » relationship between the Commission's orders and regulations. Following the introduction are sections which include the Commission's regulations by application type: preliminary permits; licenses; and exemptions. Each section contains an introduction describing application procedures by type of action requested. There are two appendices provided contain information on the consultation process and lists of agencies to be consulted and a section by section analyses of the Commission's orders.« less
Water Power Technologies FY 2017 Budget At-A-Glance
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2016-03-01
The Water Power Program is committed to developing and deploying a portfolio of innovative technologies and market solutions for clean, domestic power generation from water resources across the U.S. (hydropower, marine and hydrokinetics).
Water resources planning and management : A stochastic dual dynamic programming approach
NASA Astrophysics Data System (ADS)
Goor, Q.; Pinte, D.; Tilmant, A.
2008-12-01
Allocating water between different users and uses, including the environment, is one of the most challenging task facing water resources managers and has always been at the heart of Integrated Water Resources Management (IWRM). As water scarcity is expected to increase over time, allocation decisions among the different uses will have to be found taking into account the complex interactions between water and the economy. Hydro-economic optimization models can capture those interactions while prescribing efficient allocation policies. Many hydro-economic models found in the literature are formulated as large-scale non linear optimization problems (NLP), seeking to maximize net benefits from the system operation while meeting operational and/or institutional constraints, and describing the main hydrological processes. However, those models rarely incorporate the uncertainty inherent to the availability of water, essentially because of the computational difficulties associated stochastic formulations. The purpose of this presentation is to present a stochastic programming model that can identify economically efficient allocation policies in large-scale multipurpose multireservoir systems. The model is based on stochastic dual dynamic programming (SDDP), an extension of traditional SDP that is not affected by the curse of dimensionality. SDDP identify efficient allocation policies while considering the hydrologic uncertainty. The objective function includes the net benefits from the hydropower and irrigation sectors, as well as penalties for not meeting operational and/or institutional constraints. To be able to implement the efficient decomposition scheme that remove the computational burden, the one-stage SDDP problem has to be a linear program. Recent developments improve the representation of the non-linear and mildly non- convex hydropower function through a convex hull approximation of the true hydropower function. This model is illustrated on a cascade of 14 reservoirs on the Nile river basin.
Hydropower and sustainability: resilience and vulnerability in China's powersheds.
McNally, Amy; Magee, Darrin; Wolf, Aaron T
2009-07-01
Large dams represent a whole complex of social, economic and ecological processes, perhaps more than any other large infrastructure project. Today, countries with rapidly developing economies are constructing new dams to provide energy and flood control to growing populations in riparian and distant urban communities. If the system is lacking institutional capacity to absorb these physical and institutional changes there is potential for conflict, thereby threatening human security. In this paper, we propose analyzing sustainability (political, socioeconomic, and ecological) in terms of resilience versus vulnerability, framed within the spatial abstraction of a powershed. The powershed framework facilitates multi-scalar and transboundary analysis while remaining focused on the questions of resilience and vulnerability relating to hydropower dams. Focusing on examples from China, this paper describes the complex nature of dams using the sustainability and powershed frameworks. We then analyze the roles of institutions in China to understand the relationships between power, human security and the socio-ecological system. To inform the study of conflicts over dams China is a particularly useful case study because we can examine what happens at the international, national and local scales. The powershed perspective allows us to examine resilience and vulnerability across political boundaries from a dynamic, process-defined analytical scale while remaining focused on a host of questions relating to hydro-development that invoke drivers and impacts on national and sub-national scales. The ability to disaggregate the affects of hydropower dam construction from political boundaries allows for a deeper analysis of resilience and vulnerability. From our analysis we find that reforms in China's hydropower sector since 1996 have been motivated by the need to create stability at the national scale rather than resilient solutions to China's growing demand for energy and water resource control at the local and international scales. Some measures that improved economic development through the market economy and a combination of dam construction and institutional reform may indeed improve hydro-political resilience at a single scale. However, if China does address large-scale hydropower construction's potential to create multi-scale geopolitical tensions, they may be vulnerable to conflict - though not necessarily violent - in domestic and international political arenas. We conclude with a look toward a resilient basin institution for the Nu/Salween River, the site of a proposed large-scale hydropower development effort in China and Myanmar.
Influence of the thrust bearing on the natural frequencies of a 72-MW hydropower rotor
NASA Astrophysics Data System (ADS)
Cupillard, S.; Aidanpää, J.-O.
2016-11-01
The thrust bearing is an essential element of a hydropower machine. Not only does it carry the total axial load but it also introduces stiffness and damping properties in the system. The focus of this study is on the influence of the thrust bearing on the lateral vibrations of the shaft of a 72-MW propeller turbine. The thrust bearing has a non-conventional design with a large radius and two rows of thrust pads. A numerical model is developed to estimate natural frequencies. Numerical results are analyzed and related to experimental measurements of a runaway test. The results show the need to include the thrust bearing in the model. In fact, the vibration modes are substantially increased towards higher frequencies with the added properties from the thrust bearing. The second mode of vibration has been identified in the experimental measurements. Its frequency and mode shape compare well with numerical results.
Open-Source as a strategy for operational software - the case of Enki
NASA Astrophysics Data System (ADS)
Kolberg, Sjur; Bruland, Oddbjørn
2014-05-01
Since 2002, SINTEF Energy has been developing what is now known as the Enki modelling system. This development has been financed by Norway's largest hydropower producer Statkraft, motivated by a desire for distributed hydrological models in operational use. As the owner of the source code, Statkraft has recently decided on Open Source as a strategy for further development, and for migration from an R&D context to operational use. A current cooperation project is currently carried out between SINTEF Energy, 7 large Norwegian hydropower producers including Statkraft, three universities and one software company. Of course, the most immediate task is that of software maturing. A more important challenge, however, is one of gaining experience within the operational hydropower industry. A transition from lumped to distributed models is likely to also require revision of measurement program, calibration strategy, use of GIS and modern data sources like weather radar and satellite imagery. On the other hand, map based visualisations enable a richer information exchange between hydrologic forecasters and power market traders. The operating context of a distributed hydrology model within hydropower planning is far from settled. Being both a modelling framework and a library of plugin-routines to build models from, Enki supports the flexibility needed in this situation. Recent development has separated the core from the user interface, paving the way for a scripting API, cross-platform compilation, and front-end programs serving different degrees of flexibility, robustness and security. The open source strategy invites anyone to use Enki and to develop and contribute new modules. Once tested, the same modules are available for the operational versions of the program. A core challenge is to offer rigid testing procedures and mechanisms to reject routines in an operational setting, without limiting the experimentation with new modules. The Open Source strategy also has implications for building and maintaining competence around the source code and the advanced hydrological and statistical routines in Enki. Originally developed by hydrologists, the Enki code is now approaching a state where maintenance requires a background in professional software development. Without the advantage of proprietary source code, both hydrologic improvements and software maintenance depend on donations or development support on a case-to-case basis, a situation well known within the open source community. It remains to see whether these mechanisms suffice to keep Enki at the maintenance level required by the hydropower sector. ENKI is available from www.opensource-enki.org.
Optimizing Hydropower Day-Ahead Scheduling for the Oroville-Thermalito Project
NASA Astrophysics Data System (ADS)
Veselka, T. D.; Mahalik, M.
2012-12-01
Under an award from the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Water Power Program, a team of national laboratories is developing and demonstrating a suite of advanced, integrated analytical tools to assist managers and planners increase hydropower resources while enhancing the environment. As part of the project, Argonne National Laboratory is developing the Conventional Hydropower Energy and Environmental Systems (CHEERS) model to optimize day-ahead scheduling and real-time operations. We will present the application of CHEERS to the Oroville-Thermalito Project located in Northern California. CHEERS will aid California Department of Water Resources (CDWR) schedulers in making decisions about unit commitments and turbine-level operating points using a system-wide approach to increase hydropower efficiency and the value of power generation and ancillary services. The model determines schedules and operations that are constrained by physical limitations, characteristics of plant components, operational preferences, reliability, and environmental considerations. The optimization considers forebay and afterbay implications, interactions between cascaded power plants, turbine efficiency curves and rough zones, and operator preferences. CHEERS simultaneously considers over time the interactions among all CDWR power and water resources, hydropower economics, reservoir storage limitations, and a set of complex environmental constraints for the Thermalito Afterbay and Feather River habitats. Power marketers, day-ahead schedulers, and plant operators provide system configuration and detailed operational data, along with feedback on model design and performance. CHEERS is integrated with CDWR data systems to obtain historic and initial conditions of the system as the basis from which future operations are then optimized. Model results suggest alternative operational regimes that improve the value of CDWR resources to the grid while enhancing the environment and complying with water delivery obligations for non-power uses.
Environmental Issues Related to Conventional Hydropower
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deng, Zhiqun; Colotelo, Alison HA; Brown, Richard S.
Hydropower is the largest renewable electrical energy source in the world and has a total global capacity of approximately 1,010 GW from 150 countries. Although hydropower has many environmental advantages, hydropower dams have potential adverse ecological impacts such as fish passage, water quality, and habitat alterations.
Bridging the Information Gap: Remote Sensing and Micro Hydropower Feasibility in Data-Scarce Regions
NASA Astrophysics Data System (ADS)
Muller, Marc Francois
Access to electricity remains an impediment to development in many parts of the world, particularly in rural areas with low population densities and prohibitive grid extension costs. In that context, community-scale run-of-river hydropower---micro-hydropower---is an attractive local power generation option, particularly in mountainous regions, where appropriate slope and runoff conditions occur. Despite their promise, micro hydropower programs have generally failed to have a significant impact on rural electrification in developing nations. In Nepal, despite very favorable conditions and approximately 50 years of experience, the technology supplies only 4% of the 10 million households that do not have access to the central electricity grid. These poor results point towards a major information gap between technical experts, who may lack the incentives or local knowledge needed to design appropriate systems for rural villages, and local users, who have excellent knowledge of the community but lack technical expertise to design and manage infrastructure. Both groups suffer from a limited basis for evidence-based decision making due to sparse environmental data available to support the technical components of infrastructure design. This dissertation draws on recent advances in remote sensing data, stochastic modeling techniques and open source platforms to bridge that information gap. Streamflow is a key environmental driver of hydropower production that is particularly challenging to model due to its stochastic nature and the complexity of the underlying natural processes. The first part of the dissertation addresses the general challenge of Predicting streamflow in Ungauged Basins (PUB). It first develops an algorithm to optimize the use of rain gauge observations to improve the accuracy of remote sensing precipitation measures. It then derives and validates a process-based model to estimate streamflow distribution in seasonally dry climates using the stochastic nature of rainfall, and proposes a novel geostatistical method to regionalize its parameters across the stream network. Although motivated by the needs of micro hydropower design in Nepal, these techniques represent contributions to the broader international challenge of PUB and can be applied worldwide. The economic drivers of rural electrification are then considered by presenting an econometric technique to estimate the cost function and demand curve of micro hydropower in Nepal. The empirical strategy uses topography-based instrumental variables to identify price elasticities. All developed methods are assembled in a computer tool, along with a search algorithm that uses a digital elevation model to optimize the placement of micro hydropower infrastructure. The tool---Micro Hydro [em]Power---is an open source application that can be accessed and operated on a web-browser (http://mfmul.shinyapps.io/mhpower). Its purpose is to assist local communities in the design and evaluation of micro hydropower alternatives in their locality, while using cost and demand information provided by local users to generate accurate feasibility maps at the national level, thus bridging the information gap.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hou, Hongfei; Deng, Zhiqun; Martinez, Jayson
Currently, approximately 16% of the world’s electricity and over 80% of the world’s renewable electricity is generated from hydropower resources, and there is potential for development of a significant amount of new hydropower capacity. However, in practice, realizing all the potential hydropower resource is limited by various factors, including environmental effects and related mitigation requirements. That is why hydropower regulatory requirements frequently call for targets to be met regarding fish injury and mortality rates. Hydropower Biological Evaluation Toolset (HBET), an integrated suite of software tools, is designed to characterize hydraulic conditions of hydropower structures and provide quantitative estimates of fishmore » injury and mortality rates due to various physical stressors including strike, pressure, and shear. HBET enables users to design new studies, analyze data, perform statistical analyses, and evaluate biological responses. In this paper, we discuss the features of the HBET software and describe a case study that illustrates its functionalities. HBET can be used by turbine manufacturers, hydropower operators, and regulators to design and operate hydropower systems that minimize ecological impacts in a cost-effective manner.« less
Sensitivity of Regional Hydropower Generation to the Projected Changes in Future Watershed Hydrology
NASA Astrophysics Data System (ADS)
Kao, S. C.; Naz, B. S.; Gangrade, S.
2015-12-01
Hydropower is a key contributor to the renewable energy portfolio due to its established development history and the diverse benefits it provides to the electric power systems. With the projected change in the future watershed hydrology, including shift of snowmelt timing, increasing occurrence of extreme precipitation, and change in drought frequencies, there is a need to investigate how the regional hydropower generation may change correspondingly. To evaluate the sensitivity of watershed storage and hydropower generation to future climate change, a lumped Watershed Runoff-Energy Storage (WRES) model is developed to simulate the annual and seasonal hydropower generation at various hydropower areas in the United States. For each hydropower study area, the WRES model use the monthly precipitation and naturalized (unregulated) runoff as inputs to perform a runoff mass balance calculation for the total monthly runoff storage in all reservoirs and retention facilities in the watershed, and simulate the monthly regulated runoff release and hydropower generation through the system. The WRES model is developed and calibrated using the historic (1980-2009) monthly precipitation, runoff, and generation data, and then driven by a large set of dynamically- and statistically-downscaled Coupled Model Intercomparison Project Phase 5 climate projections to simulate the change of watershed storage and hydropower generation under different future climate scenarios. The results among different hydropower regions, storage capacities, emission scenarios, and timescales are compared and discussed in this study.
Dynamic analysis of a pumped-storage hydropower plant with random power load
NASA Astrophysics Data System (ADS)
Zhang, Hao; Chen, Diyi; Xu, Beibei; Patelli, Edoardo; Tolo, Silvia
2018-02-01
This paper analyzes the dynamic response of a pumped-storage hydropower plant in generating mode. Considering the elastic water column effects in the penstock, a linearized reduced order dynamic model of the pumped-storage hydropower plant is used in this paper. As the power load is always random, a set of random generator electric power output is introduced to research the dynamic behaviors of the pumped-storage hydropower plant. Then, the influences of the PI gains on the dynamic characteristics of the pumped-storage hydropower plant with the random power load are analyzed. In addition, the effects of initial power load and PI parameters on the stability of the pumped-storage hydropower plant are studied in depth. All of the above results will provide theoretical guidance for the study and analysis of the pumped-storage hydropower plant.
18 CFR 141.14 - Form No. 80, Licensed Hydropower Development Recreation Report.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Form No. 80, Licensed Hydropower Development Recreation Report. 141.14 Section 141.14 Conservation of Power and Water Resources... Hydropower Development Recreation Report. The form of the report, Licensed Hydropower Development Recreation...
Norway's historical and projected water balance in TWh
NASA Astrophysics Data System (ADS)
Haddeland, Ingjerd; Holmqvist, Erik
2015-04-01
Hydroelectric power production is closely linked to the water cycle, and variations in power production numbers reflect variations in weather. The expected climate changes will influence electricity supply through changes in annual and seasonal inflow of water to hydropower reservoirs. In Norway, more than 95 percent of the electricity production is from hydroelectric plants, and industry linked to hydropower has been an important part of the society for more than a century. Reliable information on historical and future available water resources is hence of crucial importance both for short and long-term planning and adaptation purposes in the hydropower sector. Traditionally, the Multi-area Power-market Simulator (EMPS) is used for modelling hydropower production in Norway. However, due to the models' high level of details and computational demand, this model is only used for historical analyses and a limited number of climate projections. A method has been developed that transfers water fluxes (mm day-1) and states (mm) into energy units (GWh mm-1), based on hydrological modelling of a limited number of catchments representing reservoir inflow to more than 700 hydropower plants in Norway. The advantages of using the conversion factor method, compared to EMPS, are its simplicity and low computational requirements. The main disadvantages are that it does not take into account flood losses and the time lag between inflow and power production. The method is used operationally for weekly and seasonal energy forecasts, and has proven successful at the range of results obtained for reproducing historical hydropower production numbers. In hydropower energy units, mean annual precipitation for the period 1981-2010 is estimated at 154 TWh year-1. On average, 24 TWh year-1 is lost through evapotranspiration, meaning runoff equals 130 TWh year-1. There are large interannual variations, and runoff available for power production ranges from 91 to 165 TWh year-1. The snow pack on average peaks in the middle of April at 54 TWh, ranging from 33 to 84 TWh. Given its simplicity, the method of using conversion factors is a time and computational efficient way of producing projections of hydropower production potential from an ensemble of climate model simulations. Regional climate model (RCM) projections are obtained from Euro-Cordex, and precipitation and temperature are bias corrected to observation based datasets at 1 km2. Preliminary results, based on an ensemble consisting of 16 members (8 RCMs, RCP4.5 and RCP8.5) and transient hydrological simulations for the period 1981-2100, indicate an increase in hydroelectric power production of up to 10 percent by the end of the century, given the effect of climate change alone. The expected increase in temperature causes a negative trend for the energy potential stored in the annual maximum snow pack. At the end of the century (2071-2100), the maximum snow pack holds 43 TWh and 30 TWh for RCP4.5 and RCP8.5, respectively, compared to 54 TWh in 1981-2010. The substantial decrease in the peak snow pack is reflected in the seasonally more even inflow to reservoirs expected in the next decades.
National Hydropower Plant Dataset, Version 1 (Update FY18Q2)
Samu, Nicole; Kao, Shih-Chieh; O'Connor, Patrick; Johnson, Megan; Uria-Martinez, Rocio; McManamay, Ryan
2016-09-30
The National Hydropower Plant Dataset, Version 1, Update FY18Q2, includes geospatial point-level locations and key characteristics of existing hydropower plants in the United States that are currently online. These data are a subset extracted from NHAAP’s Existing Hydropower Assets (EHA) dataset, which is a cornerstone of NHAAP’s EHA effort that has supported multiple U.S. hydropower R&D research initiatives related to market acceleration, environmental impact reduction, technology-to-market activities, and climate change impact assessment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, Benjamin L.; Arntzen, Evan V.; Goldman, Amy E.
The United States is home to more than 87,000 dams, 2,198 of which are actively used for hydropower production. With the December 2015 consensus adoption of the United Nations Framework Convention on Climate Change’s Paris Agreement, it is imperative for the U.S. to accurately quantify greenhouse gas fluxes from its hydropower reservoirs. Methane ebullition, or methane bubbles originating from river or lake sediments, can account for nearly all of a reservoir’s methane emissions to the atmosphere. However, methane ebullition in hydropower reservoirs has been studied in only three temperate locations, none of which are in the United States. This studymore » measures high ebullitive methane fluxes from two hydropower reservoirs in eastern Washington, synthesizes the known information about methane ebullition from tropical, boreal, and temperate hydropower reservoirs, and investigates the implications for U.S. hydropower management and growth.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... List for Hydropower Licensing Study Dispute Resolution; Notice Extending Filing Date for Applications for Panel Member List for Hydropower Licensing Study Dispute Resolution February 4, 2010. On October... on a list of resource experts willing to serve as a third panel member in the Commission's hydropower...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-19
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower... Hydropower, Inc. and Eldred L Field Hydroelectric Facility Trust. e. Name of Project: Lowell Hydroelectric... Affairs Coordinator, Boott Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... Hydropower, LLC, Eagle Creek Land Resources, LLC, Eagle Creek Water Resources, LLC; Notice of Application...: Eagle Creek Hydropower, LLC; Eagle Creek Land Resources, LLC; and Eagle Creek Water Resources, LLC. e... Contact: Robert Gates, Senior Vice President-- Operations, Eagle Creek Hydropower, LLC, Eagle Creek Water...
NASA Astrophysics Data System (ADS)
Wen, X.; Lei, X.; Fang, G.; Huang, X.
2017-12-01
Extensive cascading hydropower exploitation in southwestern China has been the subject of debate and conflict in recent years. Introducing limited ecological curves, a novel approach for derivation of hydropower-ecological joint operation chart of cascaded hydropower system was proposed, aiming to optimize the general hydropower and ecological benefits, and to alleviate the ecological deterioration in specific flood/dry conditions. The physical habitat simulation model is proposed initially to simulate the relationship between streamflow and physical habitat of target fish species and to determine the optimal ecological flow range of representative reach. The ecological—hydropower joint optimization model is established to produce the multi-objective operation chart of cascaded hydropower system. Finally, the limited ecological guiding curves were generated and added into the operation chart. The JS-MDS cascaded hydropower system on the Yuan River in southwestern China is employed as the research area. As the result, the proposed guiding curves could increase the hydropower production amount by 1.72% and 5.99% and optimize ecological conservation degree by 0.27% and 1.13% for JS and MDS Reservoir, respectively. Meanwhile, the ecological deterioration rate also sees a decrease from 6.11% to 1.11% for JS Reservoir and 26.67% to 3.89% for MDS Reservoir.
Bakken, Tor Haakon; Aase, Anne Guri; Hagen, Dagmar; Sundt, Håkon; Barton, David N; Lujala, Päivi
2014-07-01
Climate change and the needed reductions in the use of fossil fuels call for the development of renewable energy sources. However, renewable energy production, such as hydropower (both small- and large-scale) and wind power have adverse impacts on the local environment by causing reductions in biodiversity and loss of habitats and species. This paper compares the environmental impacts of many small-scale hydropower plants with a few large-scale hydropower projects and one wind power farm, based on the same set of environmental parameters; land occupation, reduction in wilderness areas (INON), visibility and impacts on red-listed species. Our basis for comparison was similar energy volumes produced, without considering the quality of the energy services provided. The results show that small-scale hydropower performs less favourably in all parameters except land occupation. The land occupation of large hydropower and wind power is in the range of 45-50 m(2)/MWh, which is more than two times larger than the small-scale hydropower, where the large land occupation for large hydropower is explained by the extent of the reservoirs. On all the three other parameters small-scale hydropower performs more than two times worse than both large hydropower and wind power. Wind power compares similarly to large-scale hydropower regarding land occupation, much better on the reduction in INON areas, and in the same range regarding red-listed species. Our results demonstrate that the selected four parameters provide a basis for further development of a fair and consistent comparison of impacts between the analysed renewable technologies. Copyright © 2014 The Authors. Published by Elsevier Ltd.. All rights reserved.
Castro, Marcia C; Krieger, Gary R; Balge, Marci Z; Tanner, Marcel; Utzinger, Jürg; Whittaker, Maxine; Singer, Burton H
2016-12-20
Large-scale corporate projects, particularly those in extractive industries or hydropower development, have a history from early in the twentieth century of creating negative environmental, social, and health impacts on communities proximal to their operations. In many instances, especially for hydropower projects, the forced resettlement of entire communities was a feature in which local cultures and core human rights were severely impacted. These projects triggered an activist opposition that progressively expanded and became influential at both the host community level and with multilateral financial institutions. In parallel to, and spurred by, this activism, a shift occurred in 1969 with the passage of the National Environmental Policy Act in the United States, which required Environmental Impact Assessment (EIA) for certain types of industrial and infrastructure projects. Over the last four decades, there has been a global movement to develop a formal legal/regulatory EIA process for large industrial and infrastructure projects. In addition, social, health, and human rights impact assessments, with associated mitigation plans, were sequentially initiated and have increasingly influenced project design and relations among companies, host governments, and locally impacted communities. Often, beneficial community-level social, economic, and health programs have voluntarily been put in place by companies. These flagship programs can serve as benchmarks for community-corporate-government partnerships in the future. Here, we present examples of such positive phenomena and also focus attention on a myriad of challenges that still lie ahead.
Castro, Marcia C.; Krieger, Gary R.; Balge, Marci Z.; Tanner, Marcel; Utzinger, Jürg; Whittaker, Maxine; Singer, Burton H.
2016-01-01
Large-scale corporate projects, particularly those in extractive industries or hydropower development, have a history from early in the twentieth century of creating negative environmental, social, and health impacts on communities proximal to their operations. In many instances, especially for hydropower projects, the forced resettlement of entire communities was a feature in which local cultures and core human rights were severely impacted. These projects triggered an activist opposition that progressively expanded and became influential at both the host community level and with multilateral financial institutions. In parallel to, and spurred by, this activism, a shift occurred in 1969 with the passage of the National Environmental Policy Act in the United States, which required Environmental Impact Assessment (EIA) for certain types of industrial and infrastructure projects. Over the last four decades, there has been a global movement to develop a formal legal/regulatory EIA process for large industrial and infrastructure projects. In addition, social, health, and human rights impact assessments, with associated mitigation plans, were sequentially initiated and have increasingly influenced project design and relations among companies, host governments, and locally impacted communities. Often, beneficial community-level social, economic, and health programs have voluntarily been put in place by companies. These flagship programs can serve as benchmarks for community–corporate–government partnerships in the future. Here, we present examples of such positive phenomena and also focus attention on a myriad of challenges that still lie ahead. PMID:27791077
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
... Illinois Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and... No.: 12626-002. c. Date filed: March 31, 2009. d. Applicant: Northern Illinois Hydropower, LLC. e... Power Act, 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Damon Zdunich, Northern Illinois Hydropower...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
... Illinois Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and... No.: 12717-002. c. Date filed: May 27, 2009. d. Applicant: Northern Illinois Hydropower, LLC. e. Name... Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610. i. FERC Contact: Dr. Nicholas Palso...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... Hydropower, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and....: 13563-001. c. Dated Filed: July 28, 2010. d. Submitted By: Juneau Hydropower, Inc. e. Name of Project... Commission's regulations. h. Potential Applicant Contact: Duff W. Mitchell, Juneau Hydropower, Inc., P.O. Box...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests... No.: P-12783-003. c. Date filed: July 22, 2009. d. Applicant: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The proposed project would be located at the existing...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
... Hydropower, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional... License. b. Project No.: P-13637-001. c. Date filed: July 12, 2010. d. Applicant: Great River Hydropower.... 21, and would consist of the following facilities: (1) A new hydropower structure, located about 100...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
... Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... c. Date filed: July 12, 2010. d. Applicant: Great River Hydropower, LLC. e. Name of Project: Upper... 796-foot-long by 46-foot-wide by 25-foot-high concrete hydropower structure consisting of 30 turbine...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... Development in the United States; Notice of Small/Low-Impact Hydropower Webinar The Federal Energy Regulatory... participants to learn what types of hydropower projects qualify as a 5-megawatt (MW) exemption, how to file a... exemption. Additionally, participants have the opportunity to ask questions and learn how to get more...
Effect of inner guide on performances of cross flow turbine
NASA Astrophysics Data System (ADS)
Kokubu, K.; Yamasaki, K.; Honda, H.; Kanemoto, T.
2012-11-01
To get the sustainable society, the hydropower with not only the large but also the mini/micro capacity has been paid attention to the power generation. The cross-flow turbines can work efficiently at the comparatively low head and/or low discharge in the onshore and the offshore, and the runner and the casing profiles have been optimizing. In this paper, the turbine composed of the optimal profiles has prepared to provide for the mini/micro hydropower, and the performances have been investigated at the low head. The hydraulic efficiency is maximal at the normal guide vane opening and deteriorates at the lower and the higher discharge than the normal discharge. Such deteriorations are brought from the unacceptable flow conditions crossing in the runner, that is, the flow direction does not meet the setting angle of the blade at the inner radius. To improve dramatically the performances, the inner guide, which guards the shaft from the water jet and adjusts the flow direction, was installed in the runner.
Conflicting hydropower development and aquatic ecosystem conservation in Bhutan
NASA Astrophysics Data System (ADS)
Wi, S.; Yang, Y. C. E.
2017-12-01
Hydropower is one of the clean energy sources that many Himalayan countries are eager to develop to solve their domestic energy deficit issue such as India, Nepal and Pakistan. Like other Himalayan countries, Bhutan also has a great potential for hydropower development. However, Bhutan is one of few countries that has a domestic energy surplus and export its hydropower generation to neighboring countries (mainly to India). Exporting hydropower is one of the major economic sources in Bhutan. However, constructions of dams and reservoirs for hydropower development inevitably involve habitat fragmentation, causing a conflict of interest with the pursuit of value in aquatic ecosystem conservation. The objectives of this study is to 1) develop a distributed hydrologic model with snow and glacier module to simulate the hydrologic regimes of seven major watersheds in Bhutan; 2) apply the hydrologic model to compute hydropower generation for all existing and potential dams; 3) evaluate cascade impacts of each individual dam on downstream regions by employing three hydro-ecological indicators: the River Connectivity Index (RCI), Dendritic Connectivity Index (DCI), total affected river stretch (ARS), and 4) analyze the tradeoffs between hydropower generation and river connectivity at the national scale by means of a multiple objective genetic algorithm. Modeling results of three Pareto Fronts between ecological indicators and hydropower generation accompany with future energy export targets from the government can inform dam selections that maximizing hydropower generation while minimizing the impact on the aquatic ecosystem (Figure 1a). The impacts of climate change on these Pareto front are also explored to identify robust dam selection under changing temperature and precipitation (Figure 1b).
Valuing trade-offs of river ecosystem services in large hydropower development in Tibet, China
NASA Astrophysics Data System (ADS)
Yu, B.; Xu, L.
2015-12-01
Hydropower development can be considered as a kind of trade-offs of ecosystem services generated by human activity for their economic and energy demand, because it can increase some river ecosystem services but decrease others. In this context, an ecosystem service trade-off framework in hydropower development was proposed in this paper. It aims to identify the ecological cost of river ecosystem and serve for the ecological compensation during hydropower development, for the hydropower services cannot completely replace the regulating services of river ecosystem. The valuing trade-offs framework was integrated by the influenced ecosystem services identification and ecosystem services valuation, through ecological monitoring and ecological economic methods, respectively. With a case study of Pondo hydropower project in Tibet, China, the valuing trade-offs of river ecosystem services in large hydropower development was illustrated. The typical ecological factors including water, sediment and soil were analyzed in this study to identify the altered river ecosystem services by Pondo hydropower project. Through the field monitoring and valuation, the results showed that the Lhasa River ecosystem services value could be changed annually by Pondo hydropower project with the increment of 5.7E+8CNY, and decrement of 5.1E+7CNY. The ecological compensation for river ecosystem should be focus on water and soil conservation, reservoir dredging and tributaries habitat protection.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pasha, M. Fayzul K.; Yang, Majntxov; Yeasmin, Dilruba
Benefited from the rapid development of multiple geospatial data sets on topography, hydrology, and existing energy-water infrastructures, the reconnaissance level hydropower resource assessment can now be conducted using geospatial models in all regions of the US. Furthermore, the updated techniques can be used to estimate the total undeveloped hydropower potential across all regions, and may eventually help identify further hydropower opportunities that were previously overlooked. To enhance the characterization of higher energy density stream-reaches, this paper explored the sensitivity of geospatial resolution on the identification of hydropower stream-reaches using the geospatial merit matrix based hydropower resource assessment (GMM-HRA) model. GMM-HRAmore » model simulation was conducted with eight different spatial resolutions on six U.S. Geological Survey (USGS) 8-digit hydrologic units (HUC8) located at three different terrains; Flat, Mild, and Steep. The results showed that more hydropower potential from higher energy density stream-reaches can be identified with increasing spatial resolution. Both Flat and Mild terrains exhibited lower impacts compared to the Steep terrain. Consequently, greater attention should be applied when selecting the discretization resolution for hydropower resource assessments in the future study.« less
Pasha, M. Fayzul K.; Yang, Majntxov; Yeasmin, Dilruba; ...
2016-01-07
Benefited from the rapid development of multiple geospatial data sets on topography, hydrology, and existing energy-water infrastructures, the reconnaissance level hydropower resource assessment can now be conducted using geospatial models in all regions of the US. Furthermore, the updated techniques can be used to estimate the total undeveloped hydropower potential across all regions, and may eventually help identify further hydropower opportunities that were previously overlooked. To enhance the characterization of higher energy density stream-reaches, this paper explored the sensitivity of geospatial resolution on the identification of hydropower stream-reaches using the geospatial merit matrix based hydropower resource assessment (GMM-HRA) model. GMM-HRAmore » model simulation was conducted with eight different spatial resolutions on six U.S. Geological Survey (USGS) 8-digit hydrologic units (HUC8) located at three different terrains; Flat, Mild, and Steep. The results showed that more hydropower potential from higher energy density stream-reaches can be identified with increasing spatial resolution. Both Flat and Mild terrains exhibited lower impacts compared to the Steep terrain. Consequently, greater attention should be applied when selecting the discretization resolution for hydropower resource assessments in the future study.« less
NASA Astrophysics Data System (ADS)
Conway, Declan; Dalin, Carole; Landman, Willem A.; Osborn, Timothy J.
2017-12-01
Hydropower comprises a significant and rapidly expanding proportion of electricity production in eastern and southern Africa. In both regions, hydropower is exposed to high levels of climate variability and regional climate linkages are strong, yet an understanding of spatial interdependences is lacking. Here we consider river basin configuration and define regions of coherent rainfall variability using cluster analysis to illustrate exposure to the risk of hydropower supply disruption of current (2015) and planned (2030) hydropower sites. Assuming completion of the dams planned, hydropower will become increasingly concentrated in the Nile (from 62% to 82% of total regional capacity) and Zambezi (from 73% to 85%) basins. By 2030, 70% and 59% of total hydropower capacity will be located in one cluster of rainfall variability in eastern and southern Africa, respectively, increasing the risk of concurrent climate-related electricity supply disruption in each region. Linking of nascent regional electricity sharing mechanisms could mitigate intraregional risk, although these mechanisms face considerable political and infrastructural challenges.
Cui, Guannan; Wang, Xuan; Xu, Linyu; Zhang, Jin; Yu, Bing
2014-01-01
Ecological suitability evaluation for hydropower development is effective in locating the most suitable area for construction and emphasizes a clear direction for water resources governance. In this paper, water footprints and transportation connectivity were introduced to improve the existing ecological suitability evaluation application for hydropower development by revising the defects of the traditional indicator system. The following conclusions were reached. (1) Tibet was in a state of water use surplus; the prospect of further hydropower development is positive. (2) Chamdo, Lhasa and Nyingchi excelled in water use efficiency, and Ali was placed last. Nakchu was slightly superior to Ali, but it lagged behind the southern regions. Lhasa, Chamdo, Nyingchi, Xigaze and Shannan were suitable for hydropower development, which could further meet local needs and benefit other regions of China. (3) The evaluation results were in accordance with the actual eco-environmental conditions of the built hydropower projects, indicating that current hydropower development planning was basically reasonable.
Game theory competition analysis of reservoir water supply and hydropower generation
NASA Astrophysics Data System (ADS)
Lee, T.
2013-12-01
The total installed capacity of the power generation systems in Taiwan is about 41,000 MW. Hydropower is one of the most important renewable energy sources, with hydropower generation capacity of about 4,540 MW. The aim of this research is to analyze competition between water supply and hydropower generation in water-energy systems. The major relationships between water and energy systems include hydropower generation by water, energy consumption for water system operation, and water consumption for energy system. In this research, a game-theoretic Cournot model is formulated to simulate oligopolistic competition between water supply, hydropower generation, and co-fired power generation in water-energy systems. A Nash equilibrium of the competitive market is derived and solved by GAMS with PATH solver. In addition, a case study analyzing the competition among water supply and hydropower generation of De-ji and Ku-Kuan reservoirs, Taipower, Star Energy, and Star-Yuan power companies in central Taiwan is conducted.
Hydropower Resource Assessment of Brazilian Streams
DOE Office of Scientific and Technical Information (OSTI.GOV)
Douglas G. Hall
The Idaho National Laboratory (INL) in collaboration with the U.S. Geological Survey (USGS) with the assistance of the Empresa de Pesquisa Energetica (EPE) and the Agencia Nacional de Energia Electrica (ANEEL) has performed a comprehensive assessment of the hydropower potential of all Brazilian natural streams. The methodology by which the assessment was performed is described. The results of the assessment are presented including an estimate of the hydropower potential for all of Brazil, and the spatial distribution of hydropower potential thus providing results on a state by state basis. The assessment results have been incorporated into a geographic information systemmore » (GIS) application for the Internet called the Virtual Hydropower Prospector do Brasil. VHP do Brasil displays potential hydropower sites on a map of Brazil in the context of topography and hydrography, existing power and transportation infrastructure, populated places and political boundaries, and land use. The features of the application, which includes tools for finding and selecting potential hydropower sites and other features and displaying their attributes, is fully described.« less
JEDI Conventional Hydropower Model | Jobs and Economic Development Impact
Economic Development Impacts (JEDI) Conventional Hydropower Model allows users to estimate economic development impacts from conventional hydropower projects and includes default information that can be
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... Hydropower, L.P.; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Project No.: 7320-040. c. Dated Filed: June 29, 2010. d. Submitted By: Erie Boulevard Hydropower, L.P. e...: John Mudre at (202) 502-8902; or e-mail at [email protected] . j. Erie Boulevard Hydropower, L.P...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Uria-Martinez, Rocio; O'Connor, Patrick W.; Johnson, Megan M.
2015-04-30
The U.S. hydropower fleet has been providing clean, reliable power for more than a hundred years. However, no systematic documentation exists of the U.S. fleet and the trends influencing it in recent years. This first-ever Hydropower Market Report seeks to fill this gap and provide industry and policy makers with a quantitative baseline on the distribution, capabilities, and status of hydropower in the United States.
Optimization algorithms for large-scale multireservoir hydropower systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiew, K.L.
Five optimization algorithms were vigorously evaluated based on applications on a hypothetical five-reservoir hydropower system. These algorithms are incremental dynamic programming (IDP), successive linear programing (SLP), feasible direction method (FDM), optimal control theory (OCT) and objective-space dynamic programming (OSDP). The performance of these algorithms were comparatively evaluated using unbiased, objective criteria which include accuracy of results, rate of convergence, smoothness of resulting storage and release trajectories, computer time and memory requirements, robustness and other pertinent secondary considerations. Results have shown that all the algorithms, with the exception of OSDP converge to optimum objective values within 1.0% difference from one another.more » The highest objective value is obtained by IDP, followed closely by OCT. Computer time required by these algorithms, however, differ by more than two orders of magnitude, ranging from 10 seconds in the case of OCT to a maximum of about 2000 seconds for IDP. With a well-designed penalty scheme to deal with state-space constraints, OCT proves to be the most-efficient algorithm based on its overall performance. SLP, FDM, and OCT were applied to the case study of Mahaweli project, a ten-powerplant system in Sri Lanka.« less
Hydropower | Climate Neutral Research Campuses | NREL
how hydropower may fit into your climate action plans. Campus Options Considerations Sample Project action plan. A history of the Cornell hydropower plant is available on the university's website. Examples
Complementing hydropower with PV and wind: optimal energy mix in a fully renewable Switzerland
NASA Astrophysics Data System (ADS)
Dujardin, Jérôme; Kahl, Annelen; Kruyt, Bert; Lehning, Michael
2017-04-01
Like several other countries, Switzerland plans to phase out its nuclear power production and will replace most or all of it by renewables. Switzerland has the chance to benefit from a large hydropower potential and has already exploited almost all of it. Currently about 60% of the Swiss electricity consumption is covered by hydropower, which will eventually leave a gap of about 40% to the other renewables mainly composed of photovoltaics (PV) and wind. With its high flexibility, storage hydropower will play a major role in the future energy mix, providing valuable power and energy balance. Our work focuses on the interplay between PV, wind and storage hydropower, to analyze the dynamics of this complex system and to identify the best PV-wind mixing ratio. Given the current electricity consumption and the currently installed pumping capacity of the storage hydropower plants, it appears that the Swiss hydropower system can completely alleviate the intermittency of PV and wind. However, some seasonal mismatch between production and demand will remain, but we show that oversizing the production from PV and wind or enlarging the reservoir capacity can be a solution to keep it to an acceptable level or even eliminate it. We found that PV, wind and hydropower performs the best together when the share of PV in the solar - wind mix is between 20 and 60%. These findings are quantitatively specific for Switzerland but qualitatively transferable to similar mountainous environments with abundant hydropower resources.
China’s rising hydropower demand challenges water sector
Liu, Junguo; Zhao, Dandan; Gerbens-Leenes, P. W.; Guan, Dabo
2015-01-01
Demand for hydropower is increasing, yet the water footprints (WFs) of reservoirs and hydropower, and their contributions to water scarcity, are poorly understood. Here, we calculate reservoir WFs (freshwater that evaporates from reservoirs) and hydropower WFs (the WF of hydroelectricity) in China based on data from 875 representative reservoirs (209 with power plants). In 2010, the reservoir WF totaled 27.9 × 109 m3 (Gm3), or 22% of China’s total water consumption. Ignoring the reservoir WF seriously underestimates human water appropriation. The reservoir WF associated with industrial, domestic and agricultural WFs caused water scarcity in 6 of the 10 major Chinese river basins from 2 to 12 months annually. The hydropower WF was 6.6 Gm3 yr−1 or 3.6 m3 of water to produce a GJ (109 J) of electricity. Hydropower is a water intensive energy carrier. As a response to global climate change, the Chinese government has promoted a further increase in hydropower energy by 70% by 2020 compared to 2012. This energy policy imposes pressure on available freshwater resources and increases water scarcity. The water-energy nexus requires strategic and coordinated implementations of hydropower development among geographical regions, as well as trade-off analysis between rising energy demand and water use sustainability. PMID:26158871
China's rising hydropower demand challenges water sector.
Liu, Junguo; Zhao, Dandan; Gerbens-Leenes, P W; Guan, Dabo
2015-07-09
Demand for hydropower is increasing, yet the water footprints (WFs) of reservoirs and hydropower, and their contributions to water scarcity, are poorly understood. Here, we calculate reservoir WFs (freshwater that evaporates from reservoirs) and hydropower WFs (the WF of hydroelectricity) in China based on data from 875 representative reservoirs (209 with power plants). In 2010, the reservoir WF totaled 27.9 × 10(9) m(3) (Gm(3)), or 22% of China's total water consumption. Ignoring the reservoir WF seriously underestimates human water appropriation. The reservoir WF associated with industrial, domestic and agricultural WFs caused water scarcity in 6 of the 10 major Chinese river basins from 2 to 12 months annually. The hydropower WF was 6.6 Gm(3) yr(-1) or 3.6 m(3) of water to produce a GJ (10(9) J) of electricity. Hydropower is a water intensive energy carrier. As a response to global climate change, the Chinese government has promoted a further increase in hydropower energy by 70% by 2020 compared to 2012. This energy policy imposes pressure on available freshwater resources and increases water scarcity. The water-energy nexus requires strategic and coordinated implementations of hydropower development among geographical regions, as well as trade-off analysis between rising energy demand and water use sustainability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kao, Shih -Chieh; Sale, Michael J.; Ashfaq, Moetasim
Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease inmore » annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.« less
Kao, Shih -Chieh; Sale, Michael J.; Ashfaq, Moetasim; ...
2014-12-18
Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease inmore » annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.« less
Present and future hydropower scheduling in Statkraft
NASA Astrophysics Data System (ADS)
Bruland, O.
2012-12-01
Statkraft produces close to 40 TWH in an average year and is one of the largest hydropower producers in Europe. For hydropower producers the scheduling of electricity generation is the key to success and this depend on optimal use of the water resources. The hydrologist and his forecasts both on short and on long terms are crucial to this success. The hydrological forecasts in Statkraft and most hydropower companies in Scandinavia are based on lumped models and the HBV concept. But before the hydrological model there is a complex system for collecting, controlling and correcting data applied in the models and the production scheduling and, equally important, routines for surveillance of the processes and manual intervention. Prior to the forecasting the states in the hydrological models are updated based on observations. When snow is present in the catchments snow surveys are an important source for model updating. The meteorological forecast is another premise provider to the hydrological forecast and to get as precise meteorological forecast as possible Statkraft hires resources from the governmental forecasting center. Their task is to interpret the meteorological situation, describe the uncertainties and if necessary use their knowledge and experience to manually correct the forecast in the hydropower production regions. This is one of several forecast applied further in the scheduling process. Both to be able to compare and evaluate different forecast providers and to ensure that we get the best available forecast, forecasts from different sources are applied. Some of these forecasts have undergone statistical corrections to reduce biases. The uncertainties related to the meteorological forecast have for a long time been approached and described by ensemble forecasts. But also the observations used for updating the model have a related uncertainty. Both to the observations itself and to how well they represent the catchment. Though well known, these uncertainties have thus far been handled superficially. Statkraft has initiated a program called ENKI to approach these issues. A part of this program is to apply distributed models for hydrological forecasting. Developing methodologies to handle uncertainties in the observations, the meteorological forecasts, the model itself and how to update the model with this information are other parts of the program. Together with energy price expectations and information about the state of the energy production system the hydrological forecast is input to the next step in the production scheduling both on short and long term. The long term schedule for reservoir filling is premise provider to the short term optimizing of water. The long term schedule is based on the actual reservoir levels, snow storages and a long history of meteorological observations and gives an overall schedule at a regional level. Within the regions a more detailed tool is used for short term optimizing of the hydropower production Each reservoir is scheduled taking into account restrictions in the water courses and cost of start and stop of aggregates. The value of the water is calculated for each reservoir and reflects the risk of water spillage. This compared to the energy price determines whether an aggregate will run or not. In a gradually more complex energy system with relatively lower regulated capacity this is an increasingly more challenging task.
Modeling Net Land Occupation of Hydropower Reservoirs in Norway for Use in Life Cycle Assessment.
Dorber, Martin; May, Roel; Verones, Francesca
2018-02-20
Increasing hydropower electricity production constitutes a unique opportunity to mitigate climate change impacts. However, hydropower electricity production also impacts aquatic and terrestrial biodiversity through freshwater habitat alteration, water quality degradation, and land use and land use change (LULUC). Today, no operational model exists that covers any of these cause-effect pathways within life cycle assessment (LCA). This paper contributes to the assessment of LULUC impacts of hydropower electricity production in Norway in LCA. We quantified the inundated land area associated with 107 hydropower reservoirs with remote sensing data and related it to yearly electricity production. Therewith, we calculated an average net land occupation of 0.027 m 2 ·yr/kWh of Norwegian storage hydropower plants for the life cycle inventory. Further, we calculated an adjusted average land occupation of 0.007 m 2 ·yr/kWh, accounting for an underestimation of water area in the performed maximum likelihood classification. The calculated land occupation values are the basis to support the development of methods for assessing the land occupation impacts of hydropower on biodiversity in LCA at a damage level.
Impacts of climate change, policy and Water-Energy-Food nexus on hydropower development
Zhang, Xiao; Li, Hong-Yi; Deng, Zhiqun Daniel; ...
2017-10-10
We report that hydropower plays an important role as the global energy system moves towards a less carbon-intensive and sustainable future as promoted under the Sustainable Development Goals (SDGs). This article provides a systematic review of the impacts from policy, climate change and Water-Energy-Food (W-E-F) nexus on hydropower development at global scale. Asia, Africa and Latin America are hotspots promoting hydropower development with capacity expansion, while Europe and North America focus on performance improvement and environment impacts mitigation. Climate change is projected to improve gross hydropower potential (GHP) at high latitude of North Hemisphere and tropical Africa and decrease thatmore » in the US, South Africa and south and central Europe. Analysis from W-E-F nexus highlights the importance of integrated approaches as well as cross-sectoral coordination so as to improve resources use efficiency and achieve sustainable hydropower development. In conclusion, these three factors together shape the future of hydropower and need to be considered for planning and operation purpose.« less
Impacts of climate change, policy and Water-Energy-Food nexus on hydropower development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, Xiao; Li, Hong-Yi; Deng, Zhiqun Daniel
We report that hydropower plays an important role as the global energy system moves towards a less carbon-intensive and sustainable future as promoted under the Sustainable Development Goals (SDGs). This article provides a systematic review of the impacts from policy, climate change and Water-Energy-Food (W-E-F) nexus on hydropower development at global scale. Asia, Africa and Latin America are hotspots promoting hydropower development with capacity expansion, while Europe and North America focus on performance improvement and environment impacts mitigation. Climate change is projected to improve gross hydropower potential (GHP) at high latitude of North Hemisphere and tropical Africa and decrease thatmore » in the US, South Africa and south and central Europe. Analysis from W-E-F nexus highlights the importance of integrated approaches as well as cross-sectoral coordination so as to improve resources use efficiency and achieve sustainable hydropower development. In conclusion, these three factors together shape the future of hydropower and need to be considered for planning and operation purpose.« less
Systematic high-resolution assessment of global hydropower potential.
Hoes, Olivier A C; Meijer, Lourens J J; van der Ent, Ruud J; van de Giesen, Nick C
2017-01-01
Population growth, increasing energy demand and the depletion of fossil fuel reserves necessitate a search for sustainable alternatives for electricity generation. Hydropower could replace a large part of the contribution of gas and oil to the present energy mix. However, previous high-resolution estimates of hydropower potential have been local, and have yet to be applied on a global scale. This study is the first to formally present a detailed evaluation of the hydropower potential of each location, based on slope and discharge of each river in the world. The gross theoretical hydropower potential is approximately 52 PWh/year divided over 11.8 million locations. This 52 PWh/year is equal to 33% of the annually required energy, while the present energy production by hydropower plants is just 3% of the annually required energy. The results of this study: all potentially interesting locations for hydroelectric power plants, are available online.
Hydropower Modeling Challenges
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stoll, Brady; Andrade, Juan; Cohen, Stuart
Hydropower facilities are important assets for the electric power sector and represent a key source of flexibility for electric grids with large amounts of variable generation. As variable renewable generation sources expand, understanding the capabilities and limitations of the flexibility from hydropower resources is important for grid planning. Appropriately modeling these resources, however, is difficult because of the wide variety of constraints these plants face that other generators do not. These constraints can be broadly categorized as environmental, operational, and regulatory. This report highlights several key issues involving incorporating these constraints when modeling hydropower operations in terms of production costmore » and capacity expansion. Many of these challenges involve a lack of data to adequately represent the constraints or issues of model complexity and run time. We present several potential methods for improving the accuracy of hydropower representation in these models to allow for a better understanding of hydropower's capabilities.« less
Systematic high-resolution assessment of global hydropower potential
van de Giesen, Nick C.
2017-01-01
Population growth, increasing energy demand and the depletion of fossil fuel reserves necessitate a search for sustainable alternatives for electricity generation. Hydropower could replace a large part of the contribution of gas and oil to the present energy mix. However, previous high-resolution estimates of hydropower potential have been local, and have yet to be applied on a global scale. This study is the first to formally present a detailed evaluation of the hydropower potential of each location, based on slope and discharge of each river in the world. The gross theoretical hydropower potential is approximately 52 PWh/year divided over 11.8 million locations. This 52 PWh/year is equal to 33% of the annually required energy, while the present energy production by hydropower plants is just 3% of the annually required energy. The results of this study: all potentially interesting locations for hydroelectric power plants, are available online. PMID:28178329
NASA Astrophysics Data System (ADS)
Stanzel, Philipp; Kling, Harald; Nicholson, Kit
2014-05-01
Hydropower is the most important energy source in Mozambique, as in many other southern African countries. In the Zambezi basin, it is one of the major economic resources, and substantial hydropower development is envisaged for the next decades. In Mozambique, the extension of the large Cahora Bassa hydropower plant and the construction of several new facilities downstream are planned. Irrigated agriculture currently plays a minor role, but has a large potential due to available land and water resources. Irrigation development, especially for the production of biofuels, is an important government policy goal in Mozambique. This contribution assesses interrelations and trade-offs between these two development options with high dependence on water availability. Potential water demand for large-scale irrigated agriculture is estimated for a mix of possible biofuel crops in three scenarios with different irrigated area sizes. Impacts on river discharge and hydropower production in the Lower Zambezi and its tributaries under two projected future climates are simulated with a hydrological model and a reservoir operation and hydropower model. Trade-offs of increasing biofuel production with decreasing hydropower generation due to diminished discharge in the Zambezi River are investigated based on potential energy production, from hydropower and biofuels, and resulting gross revenues and net benefits. Results show that the impact of irrigation withdrawal on hydropower production is rather low due to the generally high water availability in the Zambezi River. In simulations with substantial irrigated areas, hydropower generation decreases by -2% as compared to a scenario with only small irrigated areas. The economic analyses suggest that the use of water for cultivation of biofuel crops in the Zambezi basin can generate higher economic benefits than the use of water for hydroelectric power production. If world oil prices stay at more than about 80 USD/barrel, then the production of biofuels for oil import substitution will yield strong benefits except for the least efficient producers. Producing biofuels for export is more challenging and requires highly efficient production. Generally, investment in irrigated agriculture is expected to have more impact on local economy and therefore poverty reduction than investment in hydropower development.
Land Systems Impacts of Hydropower Development
NASA Astrophysics Data System (ADS)
Wu, G. C.; Torn, M. S.
2016-12-01
Hydropower is often seen as the low-cost, low-carbon, and high-return technology for meeting rising electricity demand and fueling economic growth. Despite the magnitude and pace of hydropower expansion in many developing countries, the potential land use and land cover change (LULCC), particularly indirect LULCC, resulting from hydropower development is poorly understood. Hydropower-driven LULCC can have multiple impacts ranging from global and local climate modification (e.g., increased extreme precipitation events or increased greenhouse gas emissions), ecosystem degradation and fragmentation, to feedbacks on hydropower generation (e.g., increased sedimentation of the reservoir). As a result, a better understanding of both direct and indirect LULCC impacts can inform a more integrated and low-impact model for energy planning in countries with transitioning or growing energy portfolios. This study uses multi-scale remote sensing imagery (Landsat, MODIS, fine-resolution commercial imagery) to estimate LULCC from past hydropower projects intended primarily for electricity generation in 12 countries in Africa, South and Central America, South Asia, and Southeast Asia. It is important to examine multiple locations to determine how socio-political and environmental context determines the magnitude of LULCC. Previous studies have called for the need to scale-up local case studies to examine "cumulative impacts" of multiple development activities within a watershed. We use a pre-test/post-test quasi-experimental design using a time series of classified images and vegetation indices before and after hydropower plant construction as the response variable in an interrupted time series regression analysis. This statistical technique measures the "treatment" effect of hydropower development on indirect LULCC. Preliminary results show land use change and landscape fragmentation following hydropower development, primarily agricultural and urban in nature. These results suggest that indirect land use change should be considered in the energy planning process and design of environmental impact assessments. The large-scale land system impact assessment method used in this study can be extended to examine other intensive development projects such as road construction and mining.
Disappearing rivers — The limits of environmental assessment for hydropower in India
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erlewein, Alexander, E-mail: erlewein@sai.uni-heidelberg.de
2013-11-15
The mountain rivers of the Indian Himalaya possess a vast potential for hydropower generation. After decades of comparatively modest development recent years have seen a major intensification in the construction of new hydropower dams. Although increasingly portrayed as a form of renewable energy generation, hydropower development may lead to extensive alterations of fluvial systems and conflicts with resource use patterns of local communities. To appraise and reduce adverse effects is the purpose of statutory Environmental Impact Assessments (EIA) and corresponding mitigation plans. However, in the light of ambitious policies for hydropower expansion conventional approaches of environmental assessment are increasingly challengedmore » to keep up with the intensity and pace of development. This paper aims to explore the systemic limitations of environmental assessment for hydropower development in the Indian state of Himachal Pradesh. Based on a qualitative methodology involving interviews with environmental experts, document reviews and field observations the study suggests that the current practice of constraining EIAs to the project level fails to address the larger effects of extensive hydropower development. Furthermore, it is critically discussed as to what extent the concept of Strategic Environmental Assessment (SEA) might have the potential to overcome existing shortcomings.« less
Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Levine, Aaron L
Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit presentation from the WPTO FY14-FY16 Peer Review. The toolkit is aimed at regulatory agencies, consultants, project developers, the public, and any other party interested in learning more about the hydropower regulatory process.
Hydropower Vision: Full Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
Hydropower has provided clean, affordable, reliable, and renewable electricity in the United States for more than a century. Building on hydropower’s historical significance, and to inform the continued technical evolution, energy market value, and environmental performance of the industry, the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office has led a first-of-its-kind comprehensive analysis focused on a set of potential pathways for the environmentally sustainable expansion of hydropower (hydropower generation and pumped storage) in the United States.
NASA Astrophysics Data System (ADS)
Liu, D.; Wei, X.; Li, H. Y.; Lin, M.; Tian, F.; Huang, Q.
2017-12-01
In the socio-hydrological system, the ecological functions and environmental services, which are chosen to maintain, are determined by the preference of the society, which is making the trade-off among the values of riparian vegetation, fish, river landscape, water supply, hydropower, navigation and so on. As the society develops, the preference of the value will change and the ecological functions and environmental services which are chosen to maintain will change. The aim of the study is to focus on revealing the feedback relationship of water supply, hydropower and environment and the dynamical feedback mechanism at macro-scale, and to establish socio-hydrological evolution model of the watershed based on the modeling of multiple socio-natural processes. The study will aim at the Han River in China, analyze the impact of the water supply and hydropower on the ecology, hydrology and other environment elements, and study the effect on the water supply and hydropower to ensure the ecological and environmental water of the different level. Water supply and ecology are usually competitive. In some reservoirs, hydropower and ecology are synergic relationship while they are competitive in some reservoirs. The study will analyze the multiple mechanisms to implement the dynamical feedbacks of environment to hydropower, set up the quantitative relationship description of the feedback mechanisms, recognize the dominant processes in the feedback relationships of hydropower and environment and then analyze the positive and negative feedbacks in the feedback networks. The socio-hydrological evolution model at the watershed scale will be built and applied to simulate the long-term evolution processes of the watershed of the current situation. Dynamical nexus of water supply, hydropower and environment will be investigated.
Schramm, Michael P.; Bevelhimer, Mark S.; DeRolph, Chris R.
2016-04-11
Environmental mitigation plays an important role in the environmentally sustainable development of hydropower resources. However, comprehensive data on mitigation required by the Federal Energy Regulatory Commission (FERC) at United States (US) hydropower projects is lacking. Therefore, our objective was to create a comprehensive database of mitigation required at non-federal hydropower projects and provide a synthesis of available mitigation data. Mitigation data was collated for over 300 plants licensed or relicensed from 1998 through 2013. We observed that the majority of FERC mitigation requirements deal with either hydrologic flows or recreation and that hydropower plants in the Pacific Northwest had themore » highest number of requirements. Our data indicate opportunities exist to further explore hydropower mitigation in the areas of environmental flows, fish passage, and water quality. Lastly, connecting these data with ecological outcomes, actual flow data, and larger landscape level information will be necessary to evaluate the effectiveness of mitigation and ultimately inform regulators, managers, and planners.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schramm, Michael P.; Bevelhimer, Mark S.; DeRolph, Chris R.
Environmental mitigation plays an important role in the environmentally sustainable development of hydropower resources. However, comprehensive data on mitigation required by the Federal Energy Regulatory Commission (FERC) at United States (US) hydropower projects is lacking. Therefore, our objective was to create a comprehensive database of mitigation required at non-federal hydropower projects and provide a synthesis of available mitigation data. Mitigation data was collated for over 300 plants licensed or relicensed from 1998 through 2013. We observed that the majority of FERC mitigation requirements deal with either hydrologic flows or recreation and that hydropower plants in the Pacific Northwest had themore » highest number of requirements. Our data indicate opportunities exist to further explore hydropower mitigation in the areas of environmental flows, fish passage, and water quality. Lastly, connecting these data with ecological outcomes, actual flow data, and larger landscape level information will be necessary to evaluate the effectiveness of mitigation and ultimately inform regulators, managers, and planners.« less
Miller, Benjamin L; Arntzen, Evan V; Goldman, Amy E; Richmond, Marshall C
2017-10-01
The United States is home to 2198 dams actively used for hydropower production. With the December 2015 consensus adoption of the United Nations Framework Convention on Climate Change Paris Agreement, it is important to accurately quantify anthropogenic greenhouse gas emissions. Methane ebullition, or methane bubbles originating from river or lake sediments, has been shown to account for nearly all methane emissions from tropical hydropower reservoirs to the atmosphere. However, distinct ebullitive methane fluxes have been studied in comparatively few temperate hydropower reservoirs globally. This study measures ebullitive and diffusive methane fluxes from two eastern Washington reservoirs, and synthesizes existing studies of methane ebullition in temperate, boreal, and tropical hydropower reservoirs. Ebullition comprises nearly all methane emissions (>97%) from this study's two eastern Washington hydropower reservoirs to the atmosphere. Summer methane ebullition from these reservoirs was higher than ebullition in six southeastern U.S. hydropower reservoirs, however it was similar to temperate reservoirs in other parts of the world. Our literature synthesis suggests that methane ebullition from temperate hydropower reservoirs can be seasonally elevated compared to tropical climates, however annual emissions are likely to be higher within tropical climates, emphasizing the possible range of methane ebullition fluxes and the need for the further study of temperate reservoirs. Possible future changes to the Intergovernmental Panel on Climate Change and UNFCCC guidelines for national greenhouse gas inventories highlights the need for accurate assessment of reservoir emissions.
NASA Astrophysics Data System (ADS)
Miller, Benjamin L.; Arntzen, Evan V.; Goldman, Amy E.; Richmond, Marshall C.
2017-10-01
The United States is home to 2198 dams actively used for hydropower production. With the December 2015 consensus adoption of the United Nations Framework Convention on Climate Change Paris Agreement, it is important to accurately quantify anthropogenic greenhouse gas emissions. Methane ebullition, or methane bubbles originating from river or lake sediments, has been shown to account for nearly all methane emissions from tropical hydropower reservoirs to the atmosphere. However, distinct ebullitive methane fluxes have been studied in comparatively few temperate hydropower reservoirs globally. This study measures ebullitive and diffusive methane fluxes from two eastern Washington reservoirs, and synthesizes existing studies of methane ebullition in temperate, boreal, and tropical hydropower reservoirs. Ebullition comprises nearly all methane emissions (>97%) from this study's two eastern Washington hydropower reservoirs to the atmosphere. Summer methane ebullition from these reservoirs was higher than ebullition in six southeastern U.S. hydropower reservoirs, however it was similar to temperate reservoirs in other parts of the world. Our literature synthesis suggests that methane ebullition from temperate hydropower reservoirs can be seasonally elevated compared to tropical climates, however annual emissions are likely to be higher within tropical climates, emphasizing the possible range of methane ebullition fluxes and the need for the further study of temperate reservoirs. Possible future changes to the Intergovernmental Panel on Climate Change and UNFCCC guidelines for national greenhouse gas inventories highlights the need for accurate assessment of reservoir emissions.
Producing more power from existing hydro resources
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connor, J.
1993-02-01
Rehabilitation is big business in the North American hydropower industry. Hydropower producers are replacing or rehabilitating turbines, uprating old hydro generators, and installing advanced control systems. Estimates indicate that as much as 15,000 MW of new electricall generating capacity can be obtained by rehabilitating existing hydro facilities. The cost of developing this capacity is far less than for building new power projects. In most rehabilitation projects, the existing dam, powerhouse, and access roads are retained; only new mechanical and electrica equipment is required. As a result, these projects often can be accomplished for about half the cost of developing amore » new thermal plant to provide an equivalent amount of capacity. This new power does not contribute to atmospheric pollution, cause increases in operations and maintenance costs, or create uncertainties about fuel sources. The Bureau of Reclamation, the Salt River Project, the New York Power Authority, and the Tennessee Valley Authority all are either in the midst of major hydro rehabilitation projects or gearing up for future work. This activity indicates a healthy market of hydro products and services for years to come.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13618-000] Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications February 18, 2010. On November 5, 2009, Coastal Hydropower...
Development of Sustainability Assessment Tool for Malaysian hydropower industry: A case study
NASA Astrophysics Data System (ADS)
Turan, Faiz Mohd; Johan, Kartina; Abu Sofian, Muhammad Irfan
2018-04-01
This research deals with the development of sustainability assessment tools as a medium to assess the performance of a hydropower project compliances towards sustainability practice. Since the increasing needs of implementing sustainability practice, developed countries are utilizing sustainability tools to achieve sustainable development goals. Its inception within ASEAN countries including Malaysia is still low. The problem with most tools developed from other countries is that it is not very comprehensive as well as its implementation factors are not suitable for the local environment that is not quantified. Hence, there is a need to develop a suitable sustainable assessment tool for the Malaysian hydropower industry to comply with the sustainable development goals as a bridging gap between the governor and the practitioner. The steps of achieving this goal is separated into several parts. The first part is to identify sustainable parameters from established tools as a model for comparison to enhance new parameters. The second stage is to convert equivalent quantification value from the model to the new developed tools. The last stage is to develop software program as a mean of gaining energy company feedback with systematic sustainable reporting from the surveyor so as to be able to integrate sustainability assessment, monitoring and reporting for self-improved reporting.
Rock Mass Behavior Under Hydropower Embankment Dams: A Two-Dimensional Numerical Study
NASA Astrophysics Data System (ADS)
Bondarchuk, A.; Ask, M. V. S.; Dahlström, L.-O.; Nordlund, E.
2012-09-01
Sweden has more than 190 large hydropower dams, of which about 50 are pure embankment dams and over 100 are concrete/embankment dams. This paper presents results from conceptual analyses of the response of typical Swedish rock mass to the construction of a hydropower embankment dam and its first stages of operation. The aim is to identify locations and magnitudes of displacements that are occurring in the rock foundation and grout curtain after construction of the dam, the first filling of its water reservoir, and after one seasonal variation of the water table. Coupled hydro-mechanical analysis was conducted using the two-dimensional distinct element program UDEC. Series of the simulations have been performed and the results show that the first filling of the reservoir and variation of water table induce largest magnitudes of displacement, with the greatest values obtained from the two models with high differential horizontal stresses and smallest spacing of sub-vertical fractures. These results may help identifying the condition of the dam foundation and contribute to the development of proper maintenance measures, which guarantee the safety and functionality of the dam. Additionally, newly developed dams may use these results for the estimation of the possible response of the rock foundation to the construction.
NASA Astrophysics Data System (ADS)
Peviani, Maximo; Alterach, Julio; Danelli, Andrea
2010-05-01
The three years SEE HYDROPOWER project started on June 2009, financed by the South-East Transnational Cooperation Programme (EU), aims to a sustainable exploitation of water concerning hydropower production in SEE countries, looking up to renewable energy sources development, preserving environmental quality and preventing flood risk. Hydropower is the most important renewable resource for energy production in the SEE countries but creates ecological impacts on a local scale. If on one hand, hydroelectric production has to be maintained and likely increased following the demand trend and RES-e Directive, on the other hand, hydropower utilisation often involves severe hydrological changes, damages the connectivity of water bodies and injures river ecosystems. The project gives a strong contribution to the integration between the Water Frame and the RES-e Directives in the involved countries. The SEE HYDROPOWER project promotes the optimal use of water, as multiple natural resources, in order to face the increasing regional electrical-energy demand. Furthermore, SEE HYDROPOWER defines specific needs and test methodologies & tools, in order to help public bodies to take decisions about planning and management of water and hydropower concessions, considering all multi-purposes uses, taking into account the environmental sustainability of natural resources and flooding risks. Investigations is carried on to define common strategies & methods for preserving river with particular concerns to aquatic ecosystems, considering the required Minimum Environmental Flow, macro-habitat quality, migratory fishes and related environmental issues. Other problem addressed by the Project is the contrast between Public Administration and Environmental associations on one side and the Hydropower producers on the other side, for the exploitation of water bodies. Competition between water users (for drinking, irrigation, industrial processes, power generation, etc.) is becoming a serious problem, and there is a strong need of a more accurate planning and management optimization of the resources. The partnership includes a well balance mixing of public administrations, agencies ruling hydropower development, water bodies conservation and scientific institutions having the most advanced technology applied to water management and hydropower generation. Furthermore, a permanent "consultant panel" integrated by target groups representatives from different European countries are involved in key decisions and meetings, that guaranty a concrete regional scale participation. The present work reports the overall strategy of the project and the description of the main informatic tools that are under development and implementation in five pilot regions, located in Italy, Austria, Romania, Slovenia and Greece. Keywords: WFD Directive, RES-e Directive, water multi-purpose uses, renewable energy, small hydropower production, environmental balance, minimum environmental flow, flood protection
Voluntary Green Power Procurement | Energy Analysis | NREL
state renewable portfolio standards (RPSs). Pie chart depicting the voluntary market share of non -hydropower renewable generation. And, chart depicting the voluntary market share of non-hydropower renewable generation over time, from 2006 to 2015. Voluntary market share of U.S. non-hydropower renewable generation
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-04
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13954-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-2447-001] Brookfield Smoky Mountain Hydropower LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes... proceeding, of Brookfield Smoky Mountain Hydropower LLC's application for market- based rate authority, with...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13953-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...
Global analysis of a renewable micro hydro power generation plant
NASA Astrophysics Data System (ADS)
Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul
2017-12-01
Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.
Hydropower resources at risk: The status of hydropower regulation and development - 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunt, R.T.; Hunt, J.A.
This report documents today`s hydropower licensing and development status based on published data as follows: (a) Federal Energy Regulatory Commission (FERC) databases, maintained by FERC`s Office of Hydropower Licensing, of: (1) operating FERC-regulated projects, federal projects, and known unlicensed projects; (2) surrendered licenses; and, (3) recent licensing and relicensing actions; (b) Energy Information Administration (EIA) data on installed capacity and generation from 1949 through 1995 for the various resources used to produce electricity in the U.S.; and, (c) FERC licensing orders, and environmental assessments or environmental impact statements for each individual project relicensed since 1980. The analysis conducted to preparemore » this paper includes the effects of all FERC hydropower licensing actions since 1980, and applies those findings to estimate the costs of hydropower licensing and development activity for the next 15 years. It also quantifies the national cost of hydropower regulation. The future estimates are quite conservative. The are presented in 1996 dollars without speculating on the effects of future inflation, license surrenders, conditions imposed through open-ended license articles, license terms greater than 30 years, or low water years. Instead, they show the most directly predictable influences on licensing outcomes using actual experiences since ECPA (after 1986).« less
Grid-wide subdaily hydrologic alteration under massive wind power penetration in Chile.
Haas, J; Olivares, M A; Palma-Behnke, R
2015-05-01
Hydropeaking operations can severely degrade ecosystems. As variable renewable sources (e.g. wind power) are integrated into a power grid, fluctuations in the generation-demand balance are expected to increase. In this context, compensating technologies, notably hydropower reservoir plants, could operate in a stronger peaking scheme. This issue calls for an integrated modeling of the entire power system, including not only hydropower reservoirs, but also all other plants. A novel methodology to study the link between the short-term variability of renewable energies and the subdaily hydrologic alteration, due to hydropower reservoir operations is presented. Grid operations under selected wind power portfolios are simulated using a short-term hydro-thermal coordination tool. The resulting turbined flows by relevant reservoir plants are then compared in terms of the Richard-Baker flashiness index to both the baseline and the natural flow regime. Those are then analyzed in order to: i) detect if there is a significant change in the degree of subdaily hydrologic alteration (SDHA) due to a larger wind penetration, and ii) identify which rivers are most affected. The proposed scheme is applied to Chile's Central Interconnect System (SIC) for scenarios up to 15% of wind energy penetration. Results show a major degree of SDHA under the baseline as compared to the natural regime. As wind power increases, so does the SDHA in two important rivers. This suggests a need for further ecological studies in those rivers, along with an analysis of operational constraints to limit the SDHA. Copyright © 2015 Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-11
... its APD to properly perform its function of marketing a limited amount of Federal hydropower. Western... the Federal reclamation program.\\4\\ The basic principle of the Reclamation Act of 1902 was the United... the power marketing functions from the Department of the Interior to Western.\\10\\ Pursuant to this...
NASA Astrophysics Data System (ADS)
Veselka, T. D.; Poch, L.
2011-12-01
Integrating high penetration levels of wind and solar energy resources into the power grid is a formidable challenge in virtually all interconnected systems due to the fact that supply and demand must remain in balance at all times. Since large scale electricity storage is currently not economically viable, generation must exactly match electricity demand plus energy losses in the system as time unfolds. Therefore, as generation from variable resources such as wind and solar fluctuate, production from generating resources that are easier to control and dispatch need to compensate for these fluctuations while at the same time respond to both instantaneous change in load and follow daily load profiles. The grid in the Western U.S. is not exempt to grid integration challenges associated with variable resources. However, one advantage that the power system in the Western U.S. has over many other regional power systems is that its footprint contains an abundance of hydropower resources. Hydropower plants, especially those that have reservoir water storage, can physically change electricity production levels very quickly both via a dispatcher and through automatic generation control. Since hydropower response time is typically much faster than other dispatchable resources such as steam or gas turbines, it is well suited to alleviate variable resource grid integration issues. However, despite an abundance of hydropower resources and the current low penetration of variable resources in the Western U.S., problems have already surfaced. This spring in the Pacific Northwest, wetter than normal hydropower conditions in combination with transmission constraints resulted in controversial wind resource shedding. This action was taken since water spilling would have increased dissolved oxygen levels downstream of dams thereby significantly degrading fish habitats. The extent to which hydropower resources will be able to contribute toward a stable and reliable Western grid is currently being studied. Typically these studies consider the inherent flexibility of hydropower technologies, but tend to fall short on details regarding grid operations, institutional arrangements, and hydropower environmental regulations. This presentation will focus on an analysis that Argonne National Laboratory is conducting in collaboration with the Western Area Power Administration (Western). The analysis evaluates the extent to which Western's hydropower resources may help with grid integration challenges via a proposed Energy Imbalance Market. This market encompasses most of the Western Electricity Coordinating Council footprint. It changes grid operations such that the real-time dispatch would be, in part, based on a 5-minute electricity market. The analysis includes many factors such as site-specific environmental considerations at each of its hydropower facilities, long-term firm purchase agreements, and hydropower operating objectives and goals. Results of the analysis indicate that site-specific details significantly affect the ability of hydropower plant to respond to grid needs in a future which will have a high penetration of variable resources.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-22
...: Antrim Micro-Hydropower Project. f. Location: The proposed Antrim Micro-Hydropower Project will be..., protests, and/or motions filed. k. Description of Project: The proposed Antrim Micro-Hydropower Project... and the project will not be connected to an interstate grid. When a Declaration of Intention is filed...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower, Inc.; Notice of Consulting Parties and Agenda for Section 106 Consultation Meeting On May 4, 2012, the... Hydropower, Inc. and the Eldred L. Field Hydroelectric Facility Trust (co-licensees for the Lowell...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-27
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5984-063] Erie Boulevard Hydropower, L.P.; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and....: 5984-063. c. Date Filed: May 10, 2011. d. Applicant: Erie Boulevard Hydropower, L.P. (dba Brookfield...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications February 18, 2010. On November 5, 2009, Coastal Hydropower LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
... Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 14, 2013, Houtama Hydropower LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...
78 FR 58535 - Hydropower Regulatory Efficiency Act of 2013; Supplemental Notice of Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-24
... license for hydropower development at non-powered dams and closed-loop pumped storage projects in... for licensing hydropower development at non-powered dams and closed-loop pumped storage projects... closed- loop pumped storage) affect the steps included in a two-year process? 3.9 Should there be a...
Hydropower reservoirs: cytotoxic and genotoxic assessment using the Allium cepa root model.
Rambo, Cassiano Lazarotto; Zanotelli, Patrícia; Dalegrave, Daniela; De Nez, Dinara; Szczepanik, Jozimar; Carazek, Fábio; Franscescon, Francini; Rosemberg, Denis Broock; Siebel, Anna Maria; Magro, Jacir Dal
2017-03-01
Hydropower offers a reliable source of electricity in several countries, and Brazil supplies its energy needs almost entirely through hydropower plants. Nevertheless, hydropower plants comprise large buildings and water reservoirs and dams, resulting in huge ecological disruptions. Here, we analyzed the impact of four hydropower reservoirs construction in metals and pesticides incidence and the cytotoxic and genotoxic potential of sediment elutriate of rivers from southern Brazil. Our analyses have evidenced the elevated incidence of different metals (lead, iron, cadmium, and chrome) and pesticides (methyl parathion, atrazine, and 2,4-dichlorophenoxyacetic acid). We showed that Allium cepa exposed to sediment elutriates did not change the seed germination rate and mitotic index. However, roots from Allium cepa exposed to reservoirs sediment elutriates showed increased occurrence of chromosomal aberrations and nuclear abnormalities. Therefore, the results obtained in our study indicate that sediment from reservoirs present elevated concentration of metals and pesticides and a significant genotoxic potential. Taken together, our data support that hydropower reservoirs represent an environmental scenario that could impact surrounding wildlife and population.
Minimizing water consumption when producing hydropower
NASA Astrophysics Data System (ADS)
Leon, A. S.
2015-12-01
In 2007, hydropower accounted for only 16% of the world electricity production, with other renewable sources totaling 3%. Thus, it is not surprising that when alternatives are evaluated for new energy developments, there is strong impulse for fossil fuel or nuclear energy as opposed to renewable sources. However, as hydropower schemes are often part of a multipurpose water resources development project, they can often help to finance other components of the project. In addition, hydropower systems and their associated dams and reservoirs provide human well-being benefits, such as flood control and irrigation, and societal benefits such as increased recreational activities and improved navigation. Furthermore, hydropower due to its associated reservoir storage, can provide flexibility and reliability for energy production in integrated energy systems. The storage capability of hydropower systems act as a regulating mechanism by which other intermittent and variable renewable energy sources (wind, wave, solar) can play a larger role in providing electricity of commercial quality. Minimizing water consumption for producing hydropower is critical given that overuse of water for energy production may result in a shortage of water for other purposes such as irrigation, navigation or fish passage. This paper presents a dimensional analysis for finding optimal flow discharge and optimal penstock diameter when designing impulse and reaction water turbines for hydropower systems. The objective of this analysis is to provide general insights for minimizing water consumption when producing hydropower. This analysis is based on the geometric and hydraulic characteristics of the penstock, the total hydraulic head and the desired power production. As part of this analysis, various dimensionless relationships between power production, flow discharge and head losses were derived. These relationships were used to withdraw general insights on determining optimal flow discharge and optimal penstock diameter. For instance, it was found that for minimizing water consumption, the ratio of head loss to gross head should not exceed about 15%. Two examples of application are presented to illustrate the procedure for determining optimal flow discharge and optimal penstock diameter for impulse and reaction turbines.
NASA Astrophysics Data System (ADS)
Wang, Guihua; Fang, Qinhua; Zhang, Luoping; Chen, Weiqi; Chen, Zhenming; Hong, Huasheng
2010-02-01
Hydropower development brings many negative impacts on watershed ecosystems which are not fully integrated into current decision-making largely because in practice few accept the cost and benefit beyond market. In this paper, a framework was proposed to valuate the effects on watershed ecosystem services caused by hydropower development. Watershed ecosystem services were classified into four categories of provisioning, regulating, cultural and supporting services; then effects on watershed ecosystem services caused by hydropower development were identified to 21 indicators. Thereafter various evaluation techniques including the market value method, opportunity cost approach, project restoration method, travel cost method, and contingent valuation method were determined and the models were developed to valuate these indicators reflecting specific watershed ecosystem services. This approach was applied to three representative hydropower projects (Daguan, Xizaikou and Tiangong) of Jiulong River Watershed in southeast China. It was concluded that for hydropower development: (1) the value ratio of negative impacts to positive benefits ranges from 64.09% to 91.18%, indicating that the negative impacts of hydropower development should be critically studied during its environmental administration process; (2) the biodiversity loss and water quality degradation (together accounting for 80-94%) are the major negative impacts on watershed ecosystem services; (3) the average environmental cost per unit of electricity is up to 0.206 Yuan/kW h, which is about three quarters of its on-grid power tariff; and (4) the current water resource fee accounts for only about 4% of its negative impacts value, therefore a new compensatory method by paying for ecosystem services is necessary for sustainable hydropower development. These findings provide a clear picture of both positive and negative effects of hydropower development for decision-makers in the monetary term, and also provide a basis for further design of environmental instrument such as payment for watershed ecosystem services.
Witt, Adam; Magee, Timothy; Stewart, Kevin; ...
2017-08-10
Managing energy, water, and environmental priorities and constraints within a cascade hydropower system is a challenging multiobjective optimization effort that requires advanced modeling and forecasting tools. Within the mid-Columbia River system, there is currently a lack of specific solutions for predicting how coordinated operational decisions can mitigate the impacts of total dissolved gas (TDG) supersaturation while satisfying multiple additional policy and hydropower generation objectives. In this study, a reduced-order TDG uptake equation is developed that predicts tailrace TDG at seven hydropower facilities on the mid-Columbia River. The equation is incorporated into a general multiobjective river, reservoir, and hydropower optimization toolmore » as a prioritized operating goal within a broader set of system-level objectives and constraints. A test case is presented to assess the response of TDG and hydropower generation when TDG supersaturation is optimized to remain under state water-quality standards. Satisfaction of TDG as an operating goal is highly dependent on whether constraints that limit TDG uptake are implemented at a higher priority than generation requests. According to the model, an opportunity exists to reduce TDG supersaturation and meet hydropower generation requirements by shifting spillway flows to different time periods. In conclusion, a coordinated effort between all project owners is required to implement systemwide optimized solutions that satisfy the operating policies of all stakeholders.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam; Magee, Timothy; Stewart, Kevin
Managing energy, water, and environmental priorities and constraints within a cascade hydropower system is a challenging multiobjective optimization effort that requires advanced modeling and forecasting tools. Within the mid-Columbia River system, there is currently a lack of specific solutions for predicting how coordinated operational decisions can mitigate the impacts of total dissolved gas (TDG) supersaturation while satisfying multiple additional policy and hydropower generation objectives. In this study, a reduced-order TDG uptake equation is developed that predicts tailrace TDG at seven hydropower facilities on the mid-Columbia River. The equation is incorporated into a general multiobjective river, reservoir, and hydropower optimization toolmore » as a prioritized operating goal within a broader set of system-level objectives and constraints. A test case is presented to assess the response of TDG and hydropower generation when TDG supersaturation is optimized to remain under state water-quality standards. Satisfaction of TDG as an operating goal is highly dependent on whether constraints that limit TDG uptake are implemented at a higher priority than generation requests. According to the model, an opportunity exists to reduce TDG supersaturation and meet hydropower generation requirements by shifting spillway flows to different time periods. In conclusion, a coordinated effort between all project owners is required to implement systemwide optimized solutions that satisfy the operating policies of all stakeholders.« less
Global Potential for Hydro-generated Electricity and Climate Change Impact
NASA Astrophysics Data System (ADS)
Zhou, Y.; Hejazi, M. I.; Leon, C.; Calvin, K. V.; Thomson, A. M.; Li, H. Y.
2014-12-01
Hydropower is a dominant renewable energy source at the global level, accounting for more than 15% of the world's total power supply. It is also very vulnerable to climate change. Improved understanding of climate change impact on hydropower can help develop adaptation measures to increase the resilience of energy system. In this study, we developed a comprehensive estimate of global hydropower potential using runoff and stream flow data derived from a global hydrologic model with a river routing sub-model, along with turbine technology performance, cost assumptions, and environmental consideration (Figure 1). We find that hydropower has the potential to supply a significant portion of the world energy needs, although this potential varies substantially by regions. Resources in a number of countries exceed by multiple folds the total current demand for electricity, e.g., Russia and Indonesia. A sensitivity analysis indicates that hydropower potential can be highly sensitive to a number of parameters including designed flow for capacity, cost and financing, turbine efficiency, and stream flow. The climate change impact on hydropower potential was evaluated by using runoff outputs from 4 climate models (HadCM3, PCM, CGCM2, and CSIRO2). It was found that the climate change on hydropower shows large variation not only by regions, but also climate models, and this demonstrates the importance of incorporating climate change into infrastructure-planning at the regional level though the existing uncertainties.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... Micro-Hydropower Project. f. Location: The proposed Antrim Micro-Hydropower Project will be located on... motions filed. k. Description of Project: The proposed Antrim Micro-Hydropower Project will consist of: (1...-feet to the treatment plant, where it will be connected to the interstate grid; and (6) appurtenant...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
... and walk participants through all phases of the licensing and exemption processes using the Web site. Specifically, the webinar will provide the opportunity for participants to learn about the small hydropower licensing process, find out how to get more information and assistance from FERC, and ask questions. To...
The role of hydropower in electric power integration of Asian countries
NASA Astrophysics Data System (ADS)
Belyaev, Lev; Savelyev, Vladimir; Chudinova, Lyudmila
2018-01-01
The possible role of hydropower plants in formation and operation of interstate power pools is described based on the generalization of the world experience. Peculiarities of the influence of hydropower on development of interstate electric ties in this part of the world and potential effects are showed on the example of Central and Northeast Asia.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-27
... Development in the United States; Notice of Small/Low-Impact Hydropower Webinar The Federal Energy Regulatory... projects. Specifically, the webinar will provide the opportunity for participants to learn the differences..., learn how to get more information and assistance from FERC staff, and ask questions. To register for...
NASA Astrophysics Data System (ADS)
Kibler, K. M.; Alipour, M.
2016-12-01
Achieving the universal energy access Sustainable Development Goal will require great investment in renewable energy infrastructure in the developing world. Much growth in the renewable sector will come from new hydropower projects, including small and diversion hydropower in remote and mountainous regions. Yet, human impacts to hydrological systems from diversion hydropower are poorly described. Diversion hydropower is often implemented in ungauged rivers, thus detection of impact requires flow analysis tools suited to prediction in poorly-gauged and human-altered catchments. We conduct a comprehensive analysis of hydrologic alteration in 32 rivers developed with diversion hydropower in southwestern China. As flow data are sparse, we devise an approach for estimating streamflow during pre- and post-development periods, drawing upon a decade of research into prediction in ungauged basins. We apply a rainfall-runoff model, parameterized and forced exclusively with global-scale data, in hydrologically-similar gauged and ungauged catchments. Uncertain "soft" data are incorporated through fuzzy numbers and confidence-based weighting, and a multi-criteria objective function is applied to evaluate model performance. Testing indicates that the proposed framework returns superior performance (NSE = 0.77) as compared to models parameterized by rote calibration (NSE = 0.62). Confident that the models are providing `the right answer for the right reasons', our analysis of hydrologic alteration based on simulated flows indicates statistically significant hydrologic effects of diversion hydropower across many rivers. Mean annual flows, 7-day minimum and 7-day maximum flows decreased. Frequency and duration of flow exceeding Q25 decreased while duration of flows sustained below the Q75 increased substantially. Hydrograph rise and fall rates and flow constancy increased. The proposed methodology may be applied to improve diversion hydropower design in data-limited regions.
Regional assessment of the hydropower potential of rivers in West Africa
NASA Astrophysics Data System (ADS)
Kling, Harald; Stanzel, Philipp; Fuchs, Martin
2016-04-01
The 15 countries of the Economic Community of West African States (ECOWAS) face a constant shortage of energy supply, which limits sustained economic growth. Currently there are about 50 operational hydropower plants and about 40 more are under construction or refurbishment. The potential for future hydropower development - especially for small-scale plants in rural areas - is assumed to be large, but exact data are missing. This study supports the energy initiatives of the "ECOWAS Centre for Renewable Energy and Energy Efficiency" (ECREEE) by assessing the hydropower potential of all rivers in West Africa. For more than 500,000 river reaches the hydropower potential was computed from channel slope and mean annual discharge. In large areas there is a lack of discharge observations. Therefore, an annual water balance model was used to simulate discharge. The model domain covers 5 Mio km², including e.g. the Niger, Volta, and Senegal River basins. The model was calibrated with observed data of 410 gauges, using precipitation and potential evapotranspiration data as inputs. Historic variations of observed annual discharge between 1950 and 2010 are simulated well by the model. As hydropower plants are investments with a lifetime of several decades we also assessed possible changes in future discharge due to climate change. To this end the water balance model was driven with bias-corrected climate projections of 15 Regional Climate Models for two emission scenarios of the CORDEX-Africa ensemble. The simulation results for the river network were up-scaled to sub-areas and national summaries. This information gives a regional quantification of the hydropower potential, expected climate change impacts, as well as a regional classification for general suitability (or non-suitability) of hydropower plant size - from small-scale to large projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Brennan T.; Welch, Tim; Witt, Adam M.
The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders.more » To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.« less
Efficiently approximating the Pareto frontier: Hydropower dam placement in the Amazon basin
Wu, Xiaojian; Gomes-Selman, Jonathan; Shi, Qinru; Xue, Yexiang; Garcia-Villacorta, Roosevelt; Anderson, Elizabeth; Sethi, Suresh; Steinschneider, Scott; Flecker, Alexander; Gomes, Carla P.
2018-01-01
Real–world problems are often not fully characterized by a single optimal solution, as they frequently involve multiple competing objectives; it is therefore important to identify the so-called Pareto frontier, which captures solution trade-offs. We propose a fully polynomial-time approximation scheme based on Dynamic Programming (DP) for computing a polynomially succinct curve that approximates the Pareto frontier to within an arbitrarily small > 0 on treestructured networks. Given a set of objectives, our approximation scheme runs in time polynomial in the size of the instance and 1/. We also propose a Mixed Integer Programming (MIP) scheme to approximate the Pareto frontier. The DP and MIP Pareto frontier approaches have complementary strengths and are surprisingly effective. We provide empirical results showing that our methods outperform other approaches in efficiency and accuracy. Our work is motivated by a problem in computational sustainability concerning the proliferation of hydropower dams throughout the Amazon basin. Our goal is to support decision-makers in evaluating impacted ecosystem services on the full scale of the Amazon basin. Our work is general and can be applied to approximate the Pareto frontier of a variety of multiobjective problems on tree-structured networks.
Environmental sustainability assessment of hydropower plant in Europe using life cycle assessment
NASA Astrophysics Data System (ADS)
Mahmud, M. A. P.; Huda, N.; Farjana, S. H.; Lang, C.
2018-05-01
Hydropower is the oldest and most common type of renewable source of electricity available on this planet. The end of life process of hydropower plant have significant environmental impacts, which needs to be identified and minimized to ensure an environment friendly power generation. However, identifying the environmental impacts and health hazards are very little explored in the hydropower processing routes despite a significant quantity of production worldwide. This paper highlight the life-cycle environmental impact assessment of the reservoir based hydropower generation system located in alpine and non-alpine region of Europe, addressing their ecological effects by the ReCiPe and CML methods under several impact-assessment categories such as human health, ecosystems, global warming potential, acidification potential, etc. The Australasian life-cycle inventory database and SimaPro software are utilized to accumulate life-cycle inventory dataset and to evaluate the impacts. The results reveal that plants of alpine region offer superior environmental performance for couple of considered categories: global warming and photochemical oxidation, whilst in the other cases the outcomes are almost similar. Results obtained from this study will take part an important role in promoting sustainable generation of hydropower, and thus towards environment friendly energy production.
Joint optimization of regional water-power systems
NASA Astrophysics Data System (ADS)
Pereira-Cardenal, Silvio J.; Mo, Birger; Gjelsvik, Anders; Riegels, Niels D.; Arnbjerg-Nielsen, Karsten; Bauer-Gottwein, Peter
2016-06-01
Energy and water resources systems are tightly coupled; energy is needed to deliver water and water is needed to extract or produce energy. Growing pressure on these resources has raised concerns about their long-term management and highlights the need to develop integrated solutions. A method for joint optimization of water and electric power systems was developed in order to identify methodologies to assess the broader interactions between water and energy systems. The proposed method is to include water users and power producers into an economic optimization problem that minimizes the cost of power production and maximizes the benefits of water allocation, subject to constraints from the power and hydrological systems. The method was tested on the Iberian Peninsula using simplified models of the seven major river basins and the power market. The optimization problem was successfully solved using stochastic dual dynamic programming. The results showed that current water allocation to hydropower producers in basins with high irrigation productivity, and to irrigation users in basins with high hydropower productivity was sub-optimal. Optimal allocation was achieved by managing reservoirs in very distinct ways, according to the local inflow, storage capacity, hydropower productivity, and irrigation demand and productivity. This highlights the importance of appropriately representing the water users' spatial distribution and marginal benefits and costs when allocating water resources optimally. The method can handle further spatial disaggregation and can be extended to include other aspects of the water-energy nexus.
A multi-scale spatial approach to address environmental effects of small hydropower development.
McManamay, Ryan A; Samu, Nicole; Kao, Shih-Chieh; Bevelhimer, Mark S; Hetrick, Shelaine C
2015-01-01
Hydropower development continues to grow worldwide in developed and developing countries. While the ecological and physical responses to dam construction have been well documented, translating this information into planning for hydropower development is extremely difficult. Very few studies have conducted environmental assessments to guide site-specific or widespread hydropower development. Herein, we propose a spatial approach for estimating environmental effects of hydropower development at multiple scales, as opposed to individual site-by-site assessments (e.g., environmental impact assessment). Because the complex, process-driven effects of future hydropower development may be uncertain or, at best, limited by available information, we invested considerable effort in describing novel approaches to represent environmental concerns using spatial data and in developing the spatial footprint of hydropower infrastructure. We then use two case studies in the US, one at the scale of the conterminous US and another within two adjoining rivers basins, to examine how environmental concerns can be identified and related to areas of varying energy capacity. We use combinations of reserve-design planning and multi-metric ranking to visualize tradeoffs among environmental concerns and potential energy capacity. Spatial frameworks, like the one presented, are not meant to replace more in-depth environmental assessments, but to identify information gaps and measure the sustainability of multi-development scenarios as to inform policy decisions at the basin or national level. Most importantly, the approach should foster discussions among environmental scientists and stakeholders regarding solutions to optimize energy development and environmental sustainability.
Addressing biogenic greenhouse gas emissions from hydropower in LCA.
Hertwich, Edgar G
2013-09-03
The ability of hydropower to contribute to climate change mitigation is sometimes questioned, citing emissions of methane and carbon dioxide resulting from the degradation of biogenic carbon in hydropower reservoirs. These emissions are, however, not always addressed in life cycle assessment, leading to a bias in technology comparisons, and often misunderstood. The objective of this paper is to review and analyze the generation of greenhouse gas emissions from reservoirs for the purpose of technology assessment, relating established emission measurements to power generation. A literature review, data collection, and statistical analysis of methane and CO2 emissions are conducted. In a sample of 82 measurements, methane emissions per kWh hydropower generated are log-normally distributed, ranging from micrograms to 10s of kg. A multivariate regression analysis shows that the reservoir area per kWh electricity is the most important explanatory variable. Methane emissions flux per reservoir area are correlated with the natural net primary production of the area, the age of the power plant, and the inclusion of bubbling emissions in the measurement. Even together, these factors fail to explain most of the variation in the methane flux. The global average emissions from hydropower are estimated to be 85 gCO2/kWh and 3 gCH4/kWh, with a multiplicative uncertainty factor of 2. GHG emissions from hydropower can be largely avoided by ceasing to build hydropower plants with high land use per unit of electricity generated.
Wynoochee Hydropower/Fish Hatchery: Feasibility Report and Environmental Impact Statement.
1982-09-30
Unresolved Issues. There are no unresolved issues associated with the Wynoochee hydropower/fish hatchery plan. 4. Relationship to Environmental...Requirements.l/ The relationship of the Wynoochee hydropower/fish hatchery plan to environmental requirements is summarized in the following table...Implementation of the plan would I/The relationship of the satellite fish station to the environmental requirements is not included in this discussion. Compliance
NASA Astrophysics Data System (ADS)
Castelletti, A.; Schmitt, R. J. P.; Bizzi, S.; Kondolf, G. M.
2017-12-01
Dams are essential to meet growing water and energy demands. While dams cumulatively impact downstream rivers on network-scales, dam development is mostly based on ad-hoc economic and environmental assessments of single dams. Here, we provide evidence that replacing this ad-hoc approach with early strategic planning of entire dam portfolios can greatly reduce conflicts between economic and environmental objectives of dams. In the Mekong Basin (800,000km2), 123 major dam sites (status-quo: 56 built and under construction) could generate 280,000 GWh/yr of hydropower. Cumulatively, dams risk interrupting the basin's sediment dynamics with severe impacts on livelihoods and eco-systems. To evaluate cumulative impacts and benefits of the ad-hoc planned status-quo portfolio, we combine the CASCADE sediment connectivity model with data on hydropower production and sediment trapping at each dam site. We couple CASCADE to a multi-objective genetic algorithm (BORG) identifying a) portfolios resulting in an optimal trade-off between cumulative sediment trapping and hydropower production and b) an optimal development sequence for each portfolio. We perform this analysis first for the pristine basin (i.e., without pre-existing dams) and then starting from the status-quo portfolio, deriving policy recommendations for which dams should be prioritized in the near future. The status-quo portfolio creates a sub-optimal trade-off between hydropower and sediment trapping, exploiting 50 % of the basin's hydro-electric potential and trapping 60 % of the sediment load. Alternative optimal portfolios could have produced equivalent hydropower for 30 % sediment trapping. Imminent development of mega-dams in the lower basin will increase hydropower production by 20 % but increase sediment trapping to >90 %. In contrast, following an optimal development sequence can still increase hydropower by 30 % with limited additional sediment trapping by prioritizing dams in upper parts of the basin. Our findings argue for reconsidering some imminent dam developments in the Mekong. With nearly 3000 dams awaiting development world-wide, results from the Mekong are of global importance, demonstrating that strategic planning and sequencing of dams is instrumental for sustainable development of dams and hydropower.
Implications of the Bangor Hydro decision on FERC relicensings
Pizzi, L.
1997-01-01
In the next 15 years, over 400 existing nonfederal dams will require new licenses by the Federal Energy Regulatory Commission (FERC) in order to continue operations. In many cases, state or federal agencies have a unique opportunity to condition the hydropower licenses to protect environmental values. In 1996, the Court of Appeals for the District of Columbia Circuit issued an opinion striking down a mandatory license condition imposed by the U.S. Department of the Interior in a FERC relicensing. The case, Bangor Hydro-Electric Company v.Federal Energy Regulatory Commission, is instructive for agencies regarding the procedures to be followed in imposing mandatory FERC licensing conditions in the future. After Bangor Hydro, agencies should: (1) support their decisions by substantial evidence in the FERC record, (2) request applicant studies to support agency decisions and allow public comment on the decisions as a means to test the facts and analysis, and (3) consider intervening in a case to defend the condition on appeal. Bangor Hydro also raises, but does not decide, the issue of whether the agency imposing the mandatory condition should engage in balancing the economics of the hydropower project with the public resources affected by the project.
High-resolution assessment of global technical and economic hydropower potential
NASA Astrophysics Data System (ADS)
Gernaat, David E. H. J.; Bogaart, Patrick W.; Vuuren, Detlef P. van; Biemans, Hester; Niessink, Robin
2017-10-01
Hydropower is the most important renewable energy source to date, providing over 72% of all renewable electricity globally. Yet, only limited information is available on the global potential supply of hydropower and the associated costs. Here we provide a high-resolution assessment of the technical and economic potential of hydropower at a near-global scale. Using 15"×15" discharge and 3"×3" digital elevation maps, we built virtual hydropower installations at >3.8 million sites across the globe and calculated their potential using cost optimization methods. This way we identified over 60,000 suitable sites, which together represent a remaining global potential of 9.49 PWh yr-1 below US0.50 kWh-1. The largest remaining potential is found in Asia Pacific (39%), South America (25%) and Africa (24%), of which a large part can be produced at low cost (
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam M; Smith, Brennan T
Small hydropower plants supply reliable renewable energy to the grid, though few new plants have been developed in the Unites States over the past few decades due to complex environmental challenges and poor project economics. This paper describes the current landscape of small hydropower development, and introduces a new approach to facility design that co-optimizes the extraction of hydroelectric power from a stream with other important environmental functions such as fish, sediment, and recreational passage. The approach considers hydropower facilities as an integrated system of standardized interlocking modules, designed to sustain stream functions, generate power, and interface with the streambed.more » It is hypothesized that this modular eco-design approach, when guided by input from the broader small hydropower stakeholder community, can lead to cost savings across the facility, reduced licensing and approval timelines, and ultimately, to enhanced resiliency through improved environmental performance over the lifetime of the project.« less
Hydropower in the Southeast: Balancing Lakeview and Production Optimization
NASA Astrophysics Data System (ADS)
Engstrom, J.
2017-12-01
Hydropower is the most important source of renewable electricity in Southeastern U.S. However, the region is repeatedly struck by droughts, and there are many conflicting interests in the limited water resource. This study takes a historical perspective and investigates how hydropower production patterns have changed over time, considering both natural drivers and human dimensions. Hydropower production is strongly tied to the natural variability of large-scale atmospheric drivers (teleconnections) as they affect the water availability in the whole river system and partly also the market demand. To balance the water resource between different interests is a complex task, and the conflicting interests vary by basin, sometimes over a relatively small geographic area. Here road networks adjacent to the hydropower reservoirs are used as an indicator of human development and recreational activities. Through a network analysis of the historical development of road networks surrounding the reservoir, the local and regional conflicting interests are identified and the influence on renewable electricity production quantified.
Bevelhimer, Mark S.; DeRolph, Christopher R.; Schramm, Michael P.
2016-06-06
Uncertainty about environmental mitigation needs at existing and proposed hydropower projects makes it difficult for stakeholders to minimize environmental impacts. Hydropower developers and operators desire tools to better anticipate mitigation requirements, while natural resource managers and regulators need tools to evaluate different mitigation scenarios and order effective mitigation. Here we sought to examine the feasibility of using a suite of multidisciplinary explanatory variables within a spatially explicit modeling framework to fit predictive models for future environmental mitigation requirements at hydropower projects across the conterminous U.S. Using a database comprised of mitigation requirements from more than 300 hydropower project licenses, wemore » were able to successfully fit models for nearly 50 types of environmental mitigation and to apply the predictive models to a set of more than 500 non-powered dams identified as having hydropower potential. The results demonstrate that mitigation requirements have been a result of a range of factors, from biological and hydrological to political and cultural. Furthermore, project developers can use these models to inform cost projections and design considerations, while regulators can use the models to more quickly identify likely environmental issues and potential solutions, hopefully resulting in more timely and more effective decisions on environmental mitigation.« less
DeRolph, Christopher R; Schramm, Michael P; Bevelhimer, Mark S
2016-10-01
Uncertainty about environmental mitigation needs at existing and proposed hydropower projects makes it difficult for stakeholders to minimize environmental impacts. Hydropower developers and operators desire tools to better anticipate mitigation requirements, while natural resource managers and regulators need tools to evaluate different mitigation scenarios and order effective mitigation. Here we sought to examine the feasibility of using a suite of multi-faceted explanatory variables within a spatially explicit modeling framework to fit predictive models for future environmental mitigation requirements at hydropower projects across the conterminous U.S. Using a database comprised of mitigation requirements from more than 300 hydropower project licenses, we were able to successfully fit models for nearly 50 types of environmental mitigation and to apply the predictive models to a set of more than 500 non-powered dams identified as having hydropower potential. The results demonstrate that mitigation requirements are functions of a range of factors, from biophysical to socio-political. Project developers can use these models to inform cost projections and design considerations, while regulators can use the models to more quickly identify likely environmental issues and potential solutions, hopefully resulting in more timely and more effective decisions on environmental mitigation. Copyright © 2016 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bevelhimer, Mark S.; DeRolph, Christopher R.; Schramm, Michael P.
Uncertainty about environmental mitigation needs at existing and proposed hydropower projects makes it difficult for stakeholders to minimize environmental impacts. Hydropower developers and operators desire tools to better anticipate mitigation requirements, while natural resource managers and regulators need tools to evaluate different mitigation scenarios and order effective mitigation. Here we sought to examine the feasibility of using a suite of multidisciplinary explanatory variables within a spatially explicit modeling framework to fit predictive models for future environmental mitigation requirements at hydropower projects across the conterminous U.S. Using a database comprised of mitigation requirements from more than 300 hydropower project licenses, wemore » were able to successfully fit models for nearly 50 types of environmental mitigation and to apply the predictive models to a set of more than 500 non-powered dams identified as having hydropower potential. The results demonstrate that mitigation requirements have been a result of a range of factors, from biological and hydrological to political and cultural. Furthermore, project developers can use these models to inform cost projections and design considerations, while regulators can use the models to more quickly identify likely environmental issues and potential solutions, hopefully resulting in more timely and more effective decisions on environmental mitigation.« less
Framing hydropower as green energy: assessing drivers, risks and tensions in the Eastern Himalayas
NASA Astrophysics Data System (ADS)
Ahlers, R.; Budds, J.; Joshi, D.; Merme, V.; Zwarteveen, M.
2015-04-01
The culturally and ecologically diverse region of the Eastern Himalayas is the target of ambitious hydropower development plans. Policy discourses at national and international levels position this development as synergistically positive: it combines the production of clean energy to fuel economic growth at regional and national levels with initiatives to lift poor mountain communities out of poverty. Different from hydropower development in the 20th century in which development agencies and banks were important players, contemporary initiatives importantly rely on the involvement of private actors, with a prominent role of the private finance sector. This implies that hydropower development is not only financially viable but also understood as highly profitable. This paper examines the new development of hydropower in the Eastern Himalayas of Nepal and India. It questions its framing as green energy, interrogates its links with climate change, and examines its potential for investment and capital accumulation. To do this, we also review the evidence on the extent to which its construction and operation may modify existing hydrogeological processes and ecosystems, as well as its impacts on the livelihoods of diverse groups of people that depend on these. The paper concludes that hydropower development in the region is characterized by inherent contentions and uncertainties, refuting the idea that dams constitute development projects whose impacts can be simply predicted, controlled and mitigated. Indeed, in a highly complex geological, ecological, cultural and political context that is widely regarded to be especially vulnerable to the effects of climate change, hydropower as a development strategy makes for a toxic cocktail.
Framing hydropower as green energy: assessing drivers, risks and tensions in the Eastern Himalayas
NASA Astrophysics Data System (ADS)
Ahlers, R.; Budds, J.; Joshi, D.; Merme, V.; Zwarteveen, M.
2014-11-01
The culturally and ecologically diverse region of the Eastern Himalayas is the target of ambitious hydropower development plans. Policy discourses at national and international levels position this development as synergistically positive: it combines the production of clean energy to fuel economic growth at regional and national levels with initiatives to lift poor mountain communities out of poverty. Different from hydropower development in the 20th century in which development agencies and banks were important players, contemporary initiatives importantly rely on the involvement of private actors, with a prominent role of the private finance sector. This implies that hydropower development is not only financially viable but also understood as highly profitable. This paper examines the new development of hydropower in the Eastern Himalaya of Nepal and India. It questions its framing as green energy, interrogates its links with climate change, and examines its potential for investment and capital accumulation. To do this, we also review the evidence on the extent to which its construction and operation may modify existing hydrogeological processes and ecosystems, as well as its impacts on the livelihoods of diverse groups of people that depend on these. The paper concludes that hydropower development in the region is characterised by inherent contentions and uncertainties, refuting the idea that dams constitute development projects whose impacts can be simply predicted, controlled and mitigated. Indeed, in a highly complex geological, ecological, cultural and political context that is widely regarded to be especially vulnerable to the effects of climate change, hydropower as a development strategy makes for a toxic cocktail.
Greenhouse gas emissions of hydropower in the Mekong River Basin
NASA Astrophysics Data System (ADS)
Räsänen, Timo A.; Varis, Olli; Scherer, Laura; Kummu, Matti
2018-03-01
The Mekong River Basin in Southeast Asia is undergoing extensive hydropower development, but the magnitudes of related greenhouse gas emissions (GHG) are not well known. We provide the first screening of GHG emissions of 141 existing and planned reservoirs in the basin, with a focus on atmospheric gross emissions through the reservoir water surface. The emissions were estimated using statistical models that are based on global emission measurements. The hydropower reservoirs (119) were found to have an emission range of 0.2-1994 kg CO2e MWh-1 over a 100 year lifetime with a median of 26 kg CO2e MWh-1. Hydropower reservoirs facilitating irrigation (22) had generally higher emissions reaching over 22 000 kg CO2e MWh-1. The emission fluxes for all reservoirs (141) had a range of 26-1813 000 t CO2e yr-1 over a 100 year lifetime with a median of 28 000 t CO2e yr-1. Altogether, 82% of hydropower reservoirs (119) and 45% of reservoirs also facilitating irrigation (22) have emissions comparable to other renewable energy sources (<190 kg CO2e MWh-1), while the rest have higher emissions equalling even the emission from fossil fuel power plants (>380 kg CO2e MWh-1). These results are tentative and they suggest that hydropower in the Mekong Region cannot be considered categorically as low-emission energy. Instead, the GHG emissions of hydropower should be carefully considered case-by-case together with the other impacts on the natural and social environment.
A New Tool for Environmental and Economic Optimization of Hydropower Operations
NASA Astrophysics Data System (ADS)
Saha, S.; Hayse, J. W.
2012-12-01
As part of a project funded by the U.S. Department of Energy, researchers from Argonne, Oak Ridge, Pacific Northwest, and Sandia National Laboratories collaborated on the development of an integrated toolset to enhance hydropower operational decisions related to economic value and environmental performance. As part of this effort, we developed an analytical approach (Index of River Functionality, IRF) and an associated software tool to evaluate how well discharge regimes achieve ecosystem management goals for hydropower facilities. This approach defines site-specific environmental objectives using relationships between environmental metrics and hydropower-influenced flow characteristics (e.g., discharge or temperature), with consideration given to seasonal timing, duration, and return frequency requirements for the environmental objectives. The IRF approach evaluates the degree to which an operational regime meets each objective and produces a score representing how well that regime meets the overall set of defined objectives. When integrated with other components in the toolset that are used to plan hydropower operations based upon hydrologic forecasts and various constraints on operations, the IRF approach allows an optimal release pattern to be developed based upon tradeoffs between environmental performance and economic value. We tested the toolset prototype to generate a virtual planning operation for a hydropower facility located in the Upper Colorado River basin as a demonstration exercise. We conducted planning as if looking five months into the future using data for the recently concluded 2012 water year. The environmental objectives for this demonstration were related to spawning and nursery habitat for endangered fishes using metrics associated with maintenance of instream habitat and reconnection of the main channel with floodplain wetlands in a representative reach of the river. We also applied existing mandatory operational constraints for the facility during the demonstration. We compared the optimized virtual operation identified by the toolset to actual operations at the facility for the same time period to evaluate implications of the optimized operational regime on power/revenue generation and environmental performance. Argonne National Laboratory's work was part of a larger "Water-Use-Optimization" project supported by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy, Water Power Program, under Announcement DE-FOA-0000070. The submitted manuscript has been created by UChicago Argonne, LLC, Operator of Argonne National Laboratory ("Argonne"). Argonne, a U.S. Department of Energy Office of Science laboratory, is operated under Contract No. DE-AC02-06CH11357. The U.S. Government retains for itself, and others acting on its behalf, a paid-up nonexclusive, irrevocable worldwide license in said article to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, by or on behalf of the Government.
NASA Astrophysics Data System (ADS)
Fujii, M.; Tanabe, S.; Yamada, M.
2014-12-01
Water, food and energy is three sacred treasures that are necessary for human beings. However, recent factors such as population growth and rapid increase in energy consumption have generated conflicting cases between water and energy. For example, there exist conflicts caused by enhanced energy use, such as between hydropower generation and riverine ecosystems and service water, between shale gas and ground water, between geothermal and hot spring water. This study aims to provide quantitative guidelines necessary for capacity building among various stakeholders to minimize water-energy conflicts in enhancing energy use. Among various kinds of renewable energy sources, we target baseload sources, especially focusing on renewable energy of which installation is required socially not only to reduce CO2 and other greenhouse gas emissions but to stimulate local economy. Such renewable energy sources include micro/mini hydropower and geothermal. Three municipalities in Japan, Beppu City, Obama City and Otsuchi Town are selected as primary sites of this study. Based on the calculated potential supply and demand of micro/mini hydropower generation in Beppu City, for example, we estimate the electricity of tens through hundreds of households is covered by installing new micro/mini hydropower generation plants along each river. However, the result is based on the existing infrastructures such as roads and electric lines. This means that more potentials are expected if the local society chooses options that enhance the infrastructures to increase micro/mini hydropower generation plants. In addition, further capacity building in the local society is necessary. In Japan, for example, regulations by the river law and irrigation right restrict new entry by actors to the river. Possible influences to riverine ecosystems in installing new micro/mini hydropower generation plants should also be well taken into account. Deregulation of the existing laws relevant to rivers and further incentives for business owners of micro/mini hydropower generation along with current feed-in tariff are required if our society choose an option to enhance the renewable energy.
NASA Astrophysics Data System (ADS)
Denaro, Simona; Dinh, Quang; Bizzi, Simone; Bernardi, Dario; Pavan, Sara; Castelletti, Andrea; Schippa, Leonardo; Soncini-Sessa, Rodolfo
2013-04-01
Water management through dams and reservoirs is worldwide necessary to support key human-related activities ranging from hydropower production to water allocation, and flood risk mitigation. Reservoir operations are commonly planned in order to maximize these objectives. However reservoirs strongly influence river geomorphic processes causing sediment deficit downstream, altering the flow regime, leading, often, to process of river bed incision: for instance the variations of river cross sections over few years can notably affect hydropower production, flood mitigation, water supply strategies and eco-hydrological processes of the freshwater ecosystem. The river Po (a major Italian river) has experienced severe bed incision in the last decades. For this reason infrastructure stability has been negatively affected, and capacity to derive water decreased, navigation, fishing and tourism are suffering economic damages, not to mention the impact on the environment. Our case study analyzes the management of Isola Serafini hydropower plant located on the main Po river course. The plant has a major impact to the geomorphic river processes downstream, affecting sediment supply, connectivity (stopping sediment upstream the dam) and transport capacity (altering the flow regime). Current operation policy aims at maximizing hydropower production neglecting the effects in term of geomorphic processes. A new improved policy should also consider controlling downstream river bed incision. The aim of this research is to find suitable modeling framework to identify an operating policy for Isola Serafini reservoir able to provide an optimal trade-off between these two conflicting objectives: hydropower production and river bed incision downstream. A multi-objective simulation-based optimization framework is adopted. The operating policy is parameterized as a piecewise linear function and the parameters optimized using an interactive response surface approach. Global and local response surface are comparatively assessed. Preliminary results show that a range of potentially interesting trade-off policies exist able to better control river bed incision downstream without significantly decreasing hydropower production.
NASA Astrophysics Data System (ADS)
Santos, Ana Clara; Schaefli, Bettina; Manso, Pedro; Schleiss, Anton; Portela, Maria Manuela; Rinaldo, Andrea
2015-04-01
In its Energy Strategy 2050, Switzerland is revising its energy perspectives with a strong focus on renewable sources of energy and in particular hydropower. In this context, the Swiss Government funded a number of competence centers for energy research (SCCERs), including one on the Supply of Energy (SCCER-SoE), which develops fundamental research and innovative solutions in geoenergies and hydropower . Hydropower is already the major energy source in Switzerland, corresponding to approximately 55% of the total national electricity production (which was 69 TWh in 2014). The Energy Strategy 2050 foresees at least a net increase by 1.53 TWh/year in average hydrological conditions, in a context were almost all major river systems are already exploited and a straightforward application of recent environmental laws will impact (reduce) current hydropower production. In this contribution, we present the roadmap of the SCCER-SoE and an overview of our strategy to unravel currently non-exploited hydropower potential, in particular in river systems that are already used for hydropower production. The aim is hereby to quantify non-exploited natural flows, unnecessary water spills or storage volume deficits, whilst considering non-conventional approaches to water resources valuation and management. Such a better understanding of the current potential is paramount to justify future scenarios of adaptation of the existing hydropower infrastructure combining the increase of storage capacity with new connections between existing reservoirs, heightening or strengthening existing dams, increasing the operational volume of natural lakes (including new glacier lakes), or by building new dams. Tapping hidden potential shall also require operational changes to benefit from new flow patterns emerging under an evolving climate and in particular in the context of the ongoing glacier retreat. The paper shall present a broad view over the mentioned issues and first conclusions of ongoing research at the country scale.
Hydropower assessment of Bolivia—A multisource satellite data and hydrologic modeling approach
Velpuri, Naga Manohar; Pervez, Shahriar; Cushing, W. Matthew
2016-11-28
This study produced a geospatial database for use in a decision support system by the Bolivian authorities to investigate further development and investment potentials in sustainable hydropower in Bolivia. The study assessed theoretical hydropower of all 1-kilometer (km) stream segments in the country using multisource satellite data and a hydrologic modeling approach. With the assessment covering the 2 million square kilometer (km2) region influencing Bolivia’s drainage network, the potential hydropower figures are based on theoretical yield assuming that the systems generating the power are 100 percent efficient. There are several factors to consider when determining the real-world or technical power potential of a hydropower system, and these factors can vary depending on local conditions. Since this assessment covers a large area, it was necessary to reduce these variables to the two that can be modeled consistently throughout the region, streamflow or discharge, and elevation drop or head. First, the Shuttle Radar Topography Mission high-resolution 30-meter (m) digital elevation model was used to identify stream segments with greater than 10 km2 of upstream drainage. We applied several preconditioning processes to the 30-m digital elevation model to reduce errors and improve the accuracy of stream delineation and head height estimation. A total of 316,500 1-km stream segments were identified and used in this study to assess the total theoretical hydropower potential of Bolivia. Precipitation observations from a total of 463 stations obtained from the Bolivian Servicio Nacional de Meteorología e Hidrología (Bolivian National Meteorology and Hydrology Service) and the Brazilian Agência Nacional de Águas (Brazilian National Water Agency) were used to validate six different gridded precipitation estimates for Bolivia obtained from various sources. Validation results indicated that gridded precipitation estimates from the Tropical Rainfall Measuring Mission (TRMM) reanalysis product (3B43) had the highest accuracies. The coarse-resolution (25-km) TRMM data were disaggregated to 5-km pixels using climatology information obtained from the Climate Hazards Group Infrared Precipitation with Stations dataset. About a 17-percent bias was observed in the disaggregated TRMM estimates, which was corrected using the station observations. The bias-corrected, disaggregated TRMM precipitation estimate was used to compute stream discharge using a regionalization approach. In regionalization approach, required homogeneous regions for Bolivia were derived from precipitation patterns and topographic characteristics using a k-means clustering approach. Using the discharge and head height estimates for each 1-km stream segment, we computed hydropower potential for 316,490 stream segments within Bolivia and that share borders with Bolivia. The total theoretical hydropower potential (TTHP) of these stream segments was found to be 212 gigawatts (GW). Out of this total, 77.4 GW was within protected areas where hydropower projects cannot be developed; hence, the remaining total theoretical hydropower in Bolivia (outside the protected areas) was estimated as 135 GW. Nearly 1,000 1-km stream segments, however, were within the boundaries of existing hydropower projects. The TTHP of these stream segments was nearly 1.4 GW, so the residual TTHP of the streams in Bolivia was estimated as 133 GW. Care should be exercised to understand and interpret the TTHP identified in this study because all the stream segments identified and assessed in this study cannot be harnessed to their full capacity; furthermore, factors such as required environmental flows, efficiency, economics, and feasibility need to be considered to better identify a more real-world hydropower potential. If environmental flow requirements of 20–40 percent are considered, the total theoretical power available reduces by 60–80 percent. In addition, a 0.72 efficiency factor further reduces the estimation by another 28 percent. This study provides the base theoretical hydropower potential for Bolivia, the next step is to identify optimal hydropower plant locations and factor in the principles to appraise a real-world power potential in Bolivia.
2001-05-01
GAO United States General Accounting Office Report to Congressional Requesters May 2001 LICENSING HYDROPOWER PROJECTS Better Time and Cost Data...Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle LICENSING HYDROPOWER PROJECTS: Better Time and Cost Data Needed to Reach Informed...Organization Name(s) and Address(es) General Accounting Office, PO Box 37050, Washington, DC 20013 Performing Organization Number(s) GAO-01-499
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gulliver, John S.
2015-03-01
Conventional hydropower turbine aeration test-bed for computational routines and software tools for improving environmental mitigation technologies for conventional hydropower systems. In achieving this goal, we have partnered with Alstom, a global leader in energy technology development and United States power generation, with additional funding from the Initiative for Renewable Energy and the Environment (IREE) and the College of Science and Engineering (CSE) at the UMN
Study on the adverse effects of hydropower development on international shipping
NASA Astrophysics Data System (ADS)
Wang, Changhong
2017-04-01
The Lancang - Mekong river is an important international waterway to Southeast Asia and South Asia, which has important strategic significance for promoting regional economic cooperation and safeguarding national economic and security interests. On the Mekong River, the main aim is to develop hydropower resources utilization and shipping. River Hydropower Stations are in Laos and designed by foreign enterprises according to the construction of BOT. In this study, on the basis of a lot of research work and extensive collection of relevant information, and, through in-depth analysis of research, it reveals that the upper Mekong River hydropower development have many adverse effects on international shipping, put forward related suggestions for the healthy and sustainable development of international shipping.
Water-Food Nexus on Lancang-Mekong River Basin
NASA Astrophysics Data System (ADS)
Do, P.; Tian, F.; Hu, H.
2017-12-01
Water-Food-Energy nexus on Lancang-Mekong river basin In the Lancang-Mekong river basin, the connexions between climate and the water-food-energy nexus are strong. One of them can be reflected by the hydropower energy and irrigation sectors, impacted since these last years by intense droughts and increasing salinity. The purpose of this study is to understand quantitatively how the current hydropower impact on the streamflow and the irrigated crops will be influenced by the climate change for the next 30 years. A hydropower-crop model is computed to reproduce hydropower generation and revenue, revenue from crop and crop area in 2050. The outcomes will be used for water management in the region and strengthen the cooperation mechanisms between Mekong riparian countries.
NASA Astrophysics Data System (ADS)
Anghileri, Daniela; Castelletti, Andrea; Burlando, Paolo
2015-04-01
Alpine hydropower systems are an important source of renewable energy for many countries in Europe. In Switzerland, for instance, they represent the most important domestic source of renewable energy (around 55%). However, future hydropower production may be threatened by unprecedented challenges, such as a decreasing water availability, due to climate change (CC) and associated glacier retreat, and uncertain operating conditions, such as future power needs and highly fluctuating demand on the energy market. This second aspect has gained increasingly relevance since the massive introduction of solar and wind generating systems in the portfolios of many European countries. Because hydropower systems have the potential to provide backup storage of energy to compensate for fluctuations that are typical, for instance, of solar and wind generation systems, it is important to investigate how the increased demand for flexible operation, together with climate change challenge and fluctuating markets, can impact their operating policies. The Swiss Competence Center on Supply of Electricity (www.sccer-soe.ch) has been recently established to explore new potential paths for the development of future power generation systems. In this context, we develop modelling and optimization tools to design and assess new operation strategies for hydropower systems to increase their reliability, flexibility, and robustness to future operation conditions. In particular, we develop an advanced modelling framework for the integrated simulation of the operation of hydropower plants, which accounts for CC-altered streamflow regimes, new demand and market conditions, as well as new boundary conditions for operation (e.g., aquatic ecosystem conservation). The model construction consists of two primary components: a physically based and spatially distributed hydrological model, which describes the relevant hydrological processes at the basin scale, and an agent based decision model, which describes the behavior of hydropower operators. This integrated model allows to quantitatively explore possible trajectories of future evolution of the hydropower systems under the combined effect of climate and socio-economic drivers. In a multi-objective perspective, the model can test how different hydropower operation strategies perform in terms of power production, reliability and flexibility of supply, profitability of operation, and ecosystem conservation. This contribution presents the methodological framework designed to formulate the integrated model, its expected outcomes, and some preliminary results on a pilot study.
The Economic Benefits Of Multipurpose Reservoirs In The United States- Federal Hydropower Fleet
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Witt, Adam M.; Stewart, Kevin M.
The United States is home to over 80,000 dams, of which approximately 3% are equipped with hydroelectric generating capabilities. When a dam serves as a hydropower facility, it provides a variety of energy services that range from clean, reliable power generation to load balancing that supports grid stability. In most cases, the benefits of dams and their associated reservoirs go far beyond supporting the nation s energy demand. As evidenced by the substantial presence of non-powered dams with the ability to store water in large capacities, the primary purpose of a dam may not be hydropower, but rather one ofmore » many other purposes. A dam and reservoir may support navigation, recreation, flood control, irrigation, and water supply, with each multipurpose benefit providing significant social and economic impacts on a local, regional, and national level. When hydropower is one of the services provided by a multipurpose reservoir, it is then part of an integrated system of competing uses. Operating rules, management practices, consumer demands, and environmental constraints must all be balanced to meet the multipurpose project s objectives. When federal dams are built, they are authorized by Congress to serve one or more functions. Legislation such as the Water Resources Development Act regulates the operation of the facility in order to coordinate the authorized uses and ensure the dam s intended objectives are being met. While multipurpose reservoirs account for billions of dollars in contributions to National Economic Development (NED) every year, no attempt has been made to evaluate their benefits on a national scale. This study is an on-going work conducted by Oak Ridge National Laboratory in an effort to estimate the economic benefits of multipurpose hydropower reservoirs in the United States. Given the important role that federal hydropower plays in the U.S., the first focus of this research will target the three main federal hydropower owners Tennessee Valley Authority, U.S. Army Corps of Engineers, and U.S. Bureau of Reclamation. Together these three agencies own and operate 157 powered dams which account for almost half of the total installed hydropower capacity in the U.S. Future work will include engaging publicly-owned utilities and the private sector in order to quantify the benefits of all multipurpose hydropower reservoirs in the U.S.« less
Economic implications of climate-driven trends in global hydropower generation
NASA Astrophysics Data System (ADS)
Turner, S. W. D.; Galelli, S.; Hejazi, M. I.; Clarke, L.; Edmonds, J.; Kim, S. H.
2017-12-01
Recent progress in global scale hydrological and dam modeling has allowed for the study of climate change impacts on global hydropower production. Here we explore how these impacts could affect the composition of global electricity supply, and what those changes could mean for power sector emissions and investment needs in the 21st century. Regional hydropower projections are developed for two emissions scenarios by forcing a coupled global hydrological and dam model (1593 major hydropower dams; 54% global installed capacity) with downscaled, bias-corrected climate realizations derived from sixteen General Circulation Models (GCMs). To incorporate possible non-linearity in hydropower response to climate change, dam simulations incorporate plant specifications (e.g., maximum turbine flow), reservoir storage dynamics, reservoir bathymetry, evaporation losses and bespoke, site specific operations. Consequent impacts on regional and global-level electricity generation and associated emissions and investment costs are examined using the Global Change Assessment Model (GCAM). We show that changes in hydropower generation resulting from climate change can shift power demands onto and away from carbon intensive technologies, resulting in significant impacts on CO2 emissions for several regions. Many of these countries are also highly vulnerable to investment impacts (costs of new electricity generating facilities to make up for shortfalls in hydro), which in some cases amount to tens of billions of dollars by 2100. The Balkans region—typified by weak economies in a drying region that relies heavily on hydropower—emerges as the most vulnerable. Reduced impacts of climate change on hydropower production under a low emissions scenario coincide with increased costs of marginal power generating capacity (low emissions requires greater uptake of clean generating technologies, which are more expensive). This means impacts on power sector investment costs are similar for high and low emissions scenarios.
NASA Astrophysics Data System (ADS)
Levy, M. C.; Thompson, S. E.; Cohn, A.
2014-12-01
Land use/cover change (LUCC) has occurred extensively in the Brazilian Amazon rainforest-savanna transition. Agricultural development-driven LUCC at regional scales can alter surface energy budgets, evapotranspiration (ET) and rainfall; these hydroclimatic changes impact streamflows, and thus hydropower. To date, there is only limited empirical understanding of these complex land-water-energy nexus dynamics, yet understanding is important to developing countries where both agriculture and hydropower are expanding and intensifying. To observe these changes and their interconnections, we synthesize a novel combination of ground network, remotely sensed, and empirically modeled data for LUCC, rainfall, flows, and hydropower potential. We connect the extensive temporal and spatial trends in LUCC occurring from 2000-2012 (and thus observable in the satellite record) to long-term historical flow records and run-of-river hydropower generation potential estimates. Changes in hydrologic condition are observed in terms of dry and wet season moments, extremes, and flow duration curves. Run-of-river hydropower generation potential is modeled at basin gauge points using equation models parameterized with literature-based low-head turbine efficiencies, and simple algorithms establishing optimal head and capacity from elevation and flows, respectively. Regression analyses are used to demonstrate a preliminary causal analysis of LUCC impacts to flow and energy, and discuss extension of the analysis to ungauged basins. The results are transferable to tropical and transitional forest regions worldwide where simultaneous agricultural and hydropower development potentially compete for coupled components of regional water cycles, and where policy makers and planners require an understanding of LUCC impacts to hydroclimate-dependent industries and ecosystems.
Alpine hydropower in a low carbon economy: Assessing the local implication of global policies
NASA Astrophysics Data System (ADS)
Anghileri, Daniela; Castelletti, Andrea; Burlando, Paolo
2016-04-01
In the global transition towards a more efficient and low-carbon economy, renewable energy plays a major role in displacing fossil fuels, meeting global energy demand while reducing carbon dioxide emissions. In Europe, Variable Renewable Sources (VRS), such as wind and solar power sources, are becoming a relevant share of the generation portfolios in many countries. Beside the indisputable social and environmental advantages of VRS, on the short medium term the VRS-induced lowering energy prices and increasing price's volatility might challenge traditional power sources and, among them, hydropower production, because of smaller incomes and higher maintenance costs associated to a more flexible operation of power systems. In this study, we focus on the Swiss hydropower sector analysing how different low-carbon targets and strategies established at the Swiss and European level might affect energy price formation and thus impact - through hydropower operation - water availability and ecosystems services at the catchment scale. We combine a hydrological model to simulate future water availability and an electricity market model to simulate future evolution of energy prices based on official Swiss and European energy roadmaps and CO2 price trends in the European Union. We use Multi-Objective optimization techniques to design alternative hydropower reservoir operation strategies, aiming to maximise the hydropower companies' income or to provide reliable energy supply with respect to the energy demand. This integrated model allows analysing to which extent global low-carbon policies impact reservoir operation at the local scale, and to gain insight on how to prioritise compensation measures and/or adaptation strategies to mitigate the impact of VRS on hydropower companies in increasingly water constrained settings. Numerical results are shown for a real-world case study in the Swiss Alps.
Water, energy and agricultural landuse trends at Shiroro hydropower station and environs
NASA Astrophysics Data System (ADS)
Adegun, Olubunmi; Ajayi, Olalekan; Badru, Gbolahan; Odunuga, Shakirudeen
2018-02-01
The study examines the interplay among water resources, hydropower generation and agricultural landuse at the Shiroro hydropower station and its environs, in north-central Nigeria. Non-parametric trend analysis, hydropower footprint estimation, reservoir performance analysis, change detection analysis, and inferential statistics were combined to study the water-energy and food security nexus. Results of Mann-Kendall test and Sen's slope estimator for the period 1960 to 2013 showed a declining rainfall trend at Jos, around River Kaduna headwaters at -2.6 mm yr-1, while rainfall at Kaduna and Minna upstream and downstream of the reservoir respectively showed no trend. Estimates of hydropower footprint varied between 130.4 and 704.1 m3 GJ-1 between 1995 and 2013. Power generation reliability and resilience of the reservoir was 31.6 and 38.5 % respectively with year 2011 being the most vulnerable and least satisfactory. In addition to poor reliability and resilience indices, other challenges militating against good performance of hydropower generation includes population growth and climate change issues as exemplified in the downward trend observed at the headwaters. Water inflow and power generation shows a weak positive relationship with correlation coefficient (r) of 0.48, indicating less than optimal power generation. Total area of land cultivated increased from 884.59 km2 in 1986 prior to the commissioning of the hydropower station to 1730.83 km2 in 2016 which signifies an increased contribution of the dam to ensuring food security. The reality of reducing upstream rainfall amount coupled with high water footprint of electricity from the reservoir, therefore requires that a long term roadmap to improve operational coordination and management have to be put in place.
NASA Astrophysics Data System (ADS)
Si, Y.; Li, X.; Li, T.; Huang, Y.; Yin, D.
2016-12-01
The cascade reservoirs in Upper Yellow River (UYR), one of the largest hydropower bases in China, play a vital role in peak load and frequency regulation for Northwest China Power Grid. The joint operation of this system has been put forward for years whereas has not come into effect due to management difficulties and inflow uncertainties, and thus there is still considerable improvement room for hydropower production. This study presents a decision support framework incorporating long- and short-term operation of the reservoir system. For long-term operation, we maximize hydropower production of the reservoir system using historical hydrological data of multiple years, and derive operating rule curves for storage reservoirs. For short-term operation, we develop a program consisting of three modules, namely hydrologic forecast module, reservoir operation module and coordination module. The coordination module is responsible for calling the hydrologic forecast module to acquire predicted inflow within a short-term horizon, and transferring the information to the reservoir operation module to generate optimal release decision. With the hydrologic forecast information updated, the rolling short-term optimization is iterated until the end of operation period, where the long-term operating curves serve as the ending storage target. As an application, the Digital Yellow River Integrated Model (referred to as "DYRIM", which is specially designed for runoff-sediment simulation in the Yellow River basin by Tsinghua University) is used in the hydrologic forecast module, and the successive linear programming (SLP) in the reservoir operation module. The application in the reservoir system of UYR demonstrates that the framework can effectively support real-time decision making, and ensure both computational accuracy and speed. Furthermore, it is worth noting that the general framework can be extended to any other reservoir system with any or combination of hydrological model(s) to forecast and any solver to optimize the operation of reservoir system.
NASA Astrophysics Data System (ADS)
Morales, Y.; Olivares, M. A.; Vargas, X.
2015-12-01
This research aims to improve the representation of stochastic water inflows to hydropower plants used in a grid-wide, power production scheduling model in central Chile. The model prescribes the operation of every plant in the system, including hydropower plants located in several basins, and uses stochastic dual dynamic programming (SDDP) with possible inflow scenarios defined from historical records. Each year of record is treated as a sample of weekly inflows to power plants, assuming this intrinsically incorporates spatial and temporal correlations, without any further autocorrelation analysis of the hydrological time series. However, standard good practice suggests the use of synthetic flows instead of raw historical records.The proposed approach generates synthetic inflow scenarios based on hydrological modeling of a few basins in the system and transposition of flows with other basins within so-called homogeneous zones. Hydrologic models use precipitation and temperature as inputs, and therefore this approach requires producing samples of those variables. Development and calibration of these models imply a greater demand of time compared to the purely statistical approach to synthetic flows. This approach requires consideration of the main uses in the basins: agriculture and hydroelectricity. Moreover a geostatistical analysis of the area is analyzed to generate a map that identifies the relationship between the points where the hydrological information is generated and other points of interest within the power system. Consideration of homogeneous zones involves a decrease in the effort required for generation of information compared with hydrological modeling of every point of interest. It is important to emphasize that future scenarios are derived through a probabilistic approach that incorporates the features of the hydrological year type (dry, normal or wet), covering the different possibilities in terms of availability of water resources. We present the results for Maule basin in Chile's Central Interconnected System (SIC).
Climate change impacts on high-elevation hydroelectricity in California
NASA Astrophysics Data System (ADS)
Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.
2014-03-01
While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.
Value of ecosystem hydropower service and its impact on the payment for ecosystem services.
Fu, B; Wang, Y K; Xu, P; Yan, K; Li, M
2014-02-15
Hydropower is an important service provided by ecosystems. We surveyed all the hydropower plants in the Zagunao River Basin, Southwest China. Then, we assessed the hydropower service by using the InVEST (The Integrated Value and Tradeoff of Ecosystem Service Tools) model. Finally, we discussed the impact on ecological compensation. The results showed that: 1) hydropower service value of ecosystems in the Zagunao River Basin is 216.29 Euro/hm(2) on the average, of which the high-value area with more than 475.65 Euro/hm(2) is about 750.37 km(2), accounting for 16.12% of the whole watershed, but it provides 53.47% of the whole watershed service value; 2) ecosystem is an ecological reservoir with a great regulation capacity. Dams cannot completely replace the reservoir water conservation function of ecosystems, and has high economic and environmental costs that must be paid as well. Compensation for water conservation services should become an important basis for ecological compensation of hydropower development. 3) In the current PES cases, the standard of compensation is generally low. Cascade development makes the value of upstream ecosystem services become more prominent, reflecting the differential rent value, and the value of ecosystem services should be based on the distribution of differentiated ecological compensation. Copyright © 2013 Elsevier B.V. All rights reserved.
Water resources management. World Bank policy study; Ordenacion de los recursos hidricos
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-12-31
This study examines new World Bank policies that deal with scarce water resources in developing countries. The study describes key policy goals that each country program should adopt. Practical ways to modernize irrigation techniques and hydropower systems, to protect ecosystems, minimize resettlement, and maintain biodiversity are outlined. Low-cost methods of providing drinking water for the rural poor and water for industry and agriculture are recommended.
NASA Astrophysics Data System (ADS)
Martin, A.; Pascal, C.; Leconte, R.
2014-12-01
Stochastic Dynamic Programming (SDP) is known to be an effective technique to find the optimal operating policy of hydropower systems. In order to improve the performance of SDP, this project evaluates the impact of re-updating the policy at every time step by using Ensemble Streamflow Prediction (ESP). We present a case study of the Kemano's hydropower system on the Nechako River in British Columbia, Canada. Managed by Rio Tinto Alcan (RTA), this system is subject to large streamflow volumes in spring due to important amount of snow depth during the winter season. Therefore, the operating policy should not only maximize production but also minimize the risk of flooding. The hydrological behavior of the system is simulated with CEQUEAU, a distributed and deterministic hydrological model developed by the Institut national de la recherche scientifique - Eau, Terre et Environnement (INRS-ETE) in Quebec, Canada. On each decision time step, CEQUEAU is used to generate ESP scenarios based on historical meteorological sequences and the current state of the hydrological model. These scenarios are used into the SDP to optimize the new release policy for the next time steps. This routine is then repeated over the entire simulation period. Results are compared with those obtained by using SDP on historical inflow scenarios.
Carbon emission from global hydroelectric reservoirs revisited.
Li, Siyue; Zhang, Quanfa
2014-12-01
Substantial greenhouse gas (GHG) emissions from hydropower reservoirs have been of great concerns recently, yet the significant carbon emitters of drawdown area and reservoir downstream (including spillways and turbines as well as river reaches below dams) have not been included in global carbon budget. Here, we revisit GHG emission from hydropower reservoirs by considering reservoir surface area, drawdown zone and reservoir downstream. Our estimates demonstrate around 301.3 Tg carbon dioxide (CO2)/year and 18.7 Tg methane (CH4)/year from global hydroelectric reservoirs, which are much higher than recent observations. The sum of drawdown and downstream emission, which is generally overlooked, represents 42 % CO2 and 67 % CH4 of the total emissions from hydropower reservoirs. Accordingly, the global average emissions from hydropower are estimated to be 92 g CO2/kWh and 5.7 g CH4/kWh. Nonetheless, global hydroelectricity could currently reduce approximate 2,351 Tg CO2eq/year with respect to fuel fossil plant alternative. The new findings show a substantial revision of carbon emission from the global hydropower reservoirs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-07-01
The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteriamore » which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.« less
21st century Himalayan hydropower: Growing exposure to glacial lake outburst floods?
NASA Astrophysics Data System (ADS)
Schwanghart, Wolfgang; Worni, Raphael; Huggel, Christian; Stoffel, Markus; Korup, Oliver
2014-05-01
Primary energy demand in China and India has increased fivefold since 1980. To avoid power shortages and blackouts, the hydropower infrastructure in the Hindu Kush-Himalaya region is seeing massive development, a strategy supported by the policy of the World Bank and in harmony with the framework of the Kyoto Protocol. The targeted investments in clean energy from water resources, however, may trigger far-reaching impacts to downstream communities given that hydropower projects are planned and constructed in close vicinity to glaciated areas. We hypothesize that the location of these new schemes may be subject to higher exposure to a broad portfolio of natural hazards that proliferate in the steep, dissected, and tectonically active topography of the Himalayas. Here we focus on the hazard from glacial lake outburst floods (GLOF), and offer an unprecedented regional analysis for the Hindu Kush-Himalaya orogen. We compiled a database of nearly 4,000 proglacial lakes that we mapped from satellite imagery; and focus on those as potential GLOF sources that are situated above several dozen planned and existing hydropower plants. We implemented a scenario-based flood-wave propagation model of hypothetic GLOFs, and compared thus simulated peak discharges with those of the local design floods at the power plants. Multiple model runs confirm earlier notions that GLOF discharge may exceed meteorological, i.e. monsoon-fed, flood peaks by at least an order of magnitude throughout the Hindu Kush-Himalaya. We further show that the current trend in hydropower development near glaciated areas may lead to a >15% increase of projects that may be impacted by future GLOFs. At the same time, the majority of the projects are to be sited where outburst flood modelling produces its maximum uncertainty, highlighting the problem of locating minimum risk sites for hydropower. Exposure to GLOFs is not uniformly distributed in the Himalayas, and is particularly high in rivers draining the Mt. Everest and Lulana regions of Nepal and Bhutan, respectively. Together with the dense, cascading sequence of hydropower stations along several river networks in these areas, the combination of GLOFs and artificial reservoirs in steep terrain may result in increasing threats to downstream communities. Hydropower stations are infrastructural investments with minimum design lives of several decades, and our results suggest that their planning should be orchestrated with projected changes in glacier response to future climate change. Our data underline the preponderance of glacial lakes in areas with high glacial retreat rates and a commensurate exposure of hydropower stations to GLOFs. To ensure sustainable water resources use at minimum risk implications for on-site downstream communities, potential changes in GLOF hazard should be taken seriously when planning hydropower stations in the Hindu Kush-Himalaya.
NASA Astrophysics Data System (ADS)
Razurel, Pierre; Niayifar, Amin; Perona, Paolo
2017-04-01
Hydropower plays an important role in supplying worldwide energy demand where it contributes to approximately 16% of global electricity production. Although hydropower, as an emission-free renewable energy, is a reliable source of energy to mitigate climate change, its development will increase river exploitation. The environmental impacts associated with both small hydropower plants (SHP) and traditional dammed systems have been found to the consequence of changing natural flow regime with other release policies, e.g. the minimal flow. Nowadays, in some countries, proportional allocation rules are also applied aiming to mimic the natural flow variability. For example, these dynamic rules are part of the environmental guidance in the United Kingdom and constitute an improvement in comparison to static rules. In a context in which the full hydropower potential might be reached in a close future, a solution to optimize the water allocation seems essential. In this work, we present a model that enables to simulate a wide range of water allocation rules (static and dynamic) for a specific hydropower plant and to evaluate their associated economic and ecological benefits. It is developed in the form of a graphical user interface (GUI) where, depending on the specific type of hydropower plant (i.e., SHP or traditional dammed system), the user is able to specify the different characteristics (e.g., hydrological data and turbine characteristics) of the studied system. As an alternative to commonly used policies, a new class of dynamic allocation functions (non-proportional repartition rules) is introduced (e.g., Razurel et al., 2016). The efficiency plot resulting from the simulations shows the environmental indicator and the energy produced for each allocation policies. The optimal water distribution rules can be identified on the Pareto's frontier, which is obtained by stochastic optimization in the case of storage systems (e.g., Niayifar and Perona, submitted) and by direct simulation for small hydropower ones (Razurel et al., 2016). Compared to proportional and constant minimal flows, economic and ecological efficiencies are found to be substantially improved in the case of using non-proportional water allocation rules for both SHP and traditional systems.
Hydropower Generation Performance Testing at Plants in Thailand and Laos
Kern, Jamie; Hadjerioua, Boualem; Christian, Mark H.; ...
2017-04-01
An operational assessment of four hydropower plants in Southeast Asia revealed that gains in both energy production and water conservation could be achieved with little monetary investment through operational optimization efforts.
HOMER® Energy Modeling Software 2003
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Tom
2003-12-31
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
HOMER® Energy Modeling Software
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Tom
2000-12-31
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
Hydropower Generation Performance Testing at Plants in Thailand and Laos
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kern, Jamie; Hadjerioua, Boualem; Christian, Mark H.
An operational assessment of four hydropower plants in Southeast Asia revealed that gains in both energy production and water conservation could be achieved with little monetary investment through operational optimization efforts.
Small Hydropower Development in Rwanda: Trends, Opportunities and Challenges
NASA Astrophysics Data System (ADS)
Geoffrey, Gasore; Zimmerle, Daniel; Ntagwirumugara, Etienne
2018-04-01
The Rift Valley region of Sub-Saharan Africa represents a promising area for the development of small (<5MW) hydropower resources. This study compiles data from government and UN agency reports to analyze different development outlooks. The study found that there has been a rapid deployment of small hydropower in the last 10 years. From the current total deployed small hydro of 47.5 MW, 16.5MW (35%) were deployed from 1957 to 1984 while the remaining 31 MW (65%) were deployed from 2007 to 2017. While all systems constructed prior to 1985 are grid-connected, one third of the 24 facilities constructed after 2007 are connected to off-grid systems. The study provides an overview of the economic incentives for developing small hydropower systems in Rwanda and the potential contribution of that development to Rwanda’s electrification goals.
Organizing Environmental Flow Frameworks to Meet Hydropower Mitigation Needs
NASA Astrophysics Data System (ADS)
McManamay, Ryan A.; Brewer, Shannon K.; Jager, Henriette I.; Troia, Matthew J.
2016-09-01
The global recognition of the importance of natural flow regimes to sustain the ecological integrity of river systems has led to increased societal pressure on the hydropower industry to change plant operations to improve downstream aquatic ecosystems. However, a complete reinstatement of natural flow regimes is often unrealistic when balancing water needs for ecosystems, energy production, and other human uses. Thus, stakeholders must identify a prioritized subset of flow prescriptions that meet ecological objectives in light of realistic constraints. Yet, isolating aspects of flow regimes to restore downstream of hydropower facilities is among the greatest challenges of environmental flow science due, in part, to the sheer volume of available environmental flow tools in conjunction with complex negotiation-based regulatory procedures. Herein, we propose an organizational framework that structures information and existing flow paradigms into a staged process that assists stakeholders in implementing environmental flows for hydropower facilities. The framework identifies areas where regulations fall short of the needed scientific process, and provide suggestions for stakeholders to ameliorate those situations through advanced preparation. We highlight the strengths of existing flow paradigms in their application to hydropower settings and suggest when and where tools are most applicable. Our suggested framework increases the effectiveness and efficiency of the e-flow implementation process by rapidly establishing a knowledge base and decreasing uncertainty so more time can be devoted to filling knowledge gaps. Lastly, the framework provides the structure for a coordinated research agenda to further the science of environmental flows related to hydropower environments.
Organizing environmental flow frameworks to meet hydropower mitigation needs
McManamay, Ryan A.; Brewer, Shannon K.; Jager, Henriette; Troia, Matthew J.
2016-01-01
The global recognition of the importance of natural flow regimes to sustain the ecological integrity of river systems has led to increased societal pressure on the hydropower industry to change plant operations to improve downstream aquatic ecosystems. However, a complete reinstatement of natural flow regimes is often unrealistic when balancing water needs for ecosystems, energy production, and other human uses. Thus, stakeholders must identify a prioritized subset of flow prescriptions that meet ecological objectives in light of realistic constraints. Yet, isolating aspects of flow regimes to restore downstream of hydropower facilities is among the greatest challenges of environmental flow science due, in part, to the sheer volume of available environmental flow tools in conjunction with complex negotiation-based regulatory procedures. Herein, we propose an organizational framework that structures information and existing flow paradigms into a staged process that assists stakeholders in implementing environmental flows for hydropower facilities. The framework identifies areas where regulations fall short of the needed scientific process, and provide suggestions for stakeholders to ameliorate those situations through advanced preparation. We highlight the strengths of existing flow paradigms in their application to hydropower settings and suggest when and where tools are most applicable. Our suggested framework increases the effectiveness and efficiency of the e-flow implementation process by rapidly establishing a knowledge base and decreasing uncertainty so more time can be devoted to filling knowledge gaps. Lastly, the framework provides the structure for a coordinated research agenda to further the science of environmental flows related to hydropower environments.
Improved evaluation of the blue water footprint from hydropower in the United States
NASA Astrophysics Data System (ADS)
Zhao, G.; Gao, H.
2017-12-01
As the world's largest source of renewable energy, hydropower contributes 16.6% of the electricity production in the world. Even though it produces no waste, hydropower exhausts a considerable amount of water mostly through evaporation from the extended surface areas of the manmade lakes. The water footprint of hydropower becomes even larger with rising temperatures. To assist with the precise management of both water resources and energy production in the Contiguous United States (CONUS), 82 major dams—all with a primary purpose of producing hydroelectric power—were evaluated in terms of their blue water footprints. These dams account for 21% of the entire hydropower generation in the CONUS. Reservoir evaporation is calculated using state-of-the-art reservoir surface area and evaporation rate information. Instead of using fixed surface areas for the reservoirs—a practice which is adopted by virtually all other studies (and generally leads to over-or-under estimations)—time-variant surface areas were generated from Landsat imageries archived on Google Earth Engine (GEE) platform. Additionally, evaporation rates were calculated using an equilibrium method that incorporates the heat storage effects of the reservoirs. Results show that water consumption from hydropower is large and non-negligible. Furthermore, the differences of the blue water footprints among the dams studied are also significant. The results of this study can benefit the evaluation of existing dams (e.g. recommendation for dam removal) and the planning of future hydroelectric dams.
Organizing Environmental Flow Frameworks to Meet Hydropower Mitigation Needs.
McManamay, Ryan A; Brewer, Shannon K; Jager, Henriette I; Troia, Matthew J
2016-09-01
The global recognition of the importance of natural flow regimes to sustain the ecological integrity of river systems has led to increased societal pressure on the hydropower industry to change plant operations to improve downstream aquatic ecosystems. However, a complete reinstatement of natural flow regimes is often unrealistic when balancing water needs for ecosystems, energy production, and other human uses. Thus, stakeholders must identify a prioritized subset of flow prescriptions that meet ecological objectives in light of realistic constraints. Yet, isolating aspects of flow regimes to restore downstream of hydropower facilities is among the greatest challenges of environmental flow science due, in part, to the sheer volume of available environmental flow tools in conjunction with complex negotiation-based regulatory procedures. Herein, we propose an organizational framework that structures information and existing flow paradigms into a staged process that assists stakeholders in implementing environmental flows for hydropower facilities. The framework identifies areas where regulations fall short of the needed scientific process, and provide suggestions for stakeholders to ameliorate those situations through advanced preparation. We highlight the strengths of existing flow paradigms in their application to hydropower settings and suggest when and where tools are most applicable. Our suggested framework increases the effectiveness and efficiency of the e-flow implementation process by rapidly establishing a knowledge base and decreasing uncertainty so more time can be devoted to filling knowledge gaps. Lastly, the framework provides the structure for a coordinated research agenda to further the science of environmental flows related to hydropower environments.
NASA Astrophysics Data System (ADS)
Anghileri, Daniela; Botter, Martina; Castelletti, Andrea; Burlando, Paolo
2016-04-01
Alpine hydropower systems are experiencing dramatic changes both from the point of view of hydrological conditions, e.g., water availability and frequency of extremes events, and of energy market conditions, e.g., partial or total liberalization of the market and increasing share of renewable power sources. Scientific literature has, so far, mostly focused on the analysis of climate change impacts and associated uncertainty on hydropower operation, underlooking the consequences that socio-economic changes, e.g., energy demand and/or price changes, can have on hydropower productivity and profitability. In this work, we analyse how hydropower reservoir operation is affected by changes in both water availability and energy price. We consider stochastically downscaled climate change scenarios of precipitation and temperature to simulate reservoir inflows using a physically explicit hydrological model. We consider different scenarios of energy demand and generation mix to simulate energy prices using an electricity market model, which includes different generation sources, demand sinks, and features of the transmission lines. We then use Multi-Objective optimization techniques to design the operation of hydropower reservoirs for different purposes, e.g. maximization of revenue and/or energy production. The objective of the work is to assess how the tradeoffs between the multiple operating objectives evolve under different co-varying climate change and socio-economic scenarios and to assess the adaptive capacity of the system. The modeling framework is tested on the real-world case study of the Mattmark reservoir in Switzerland.
NASA Astrophysics Data System (ADS)
Kalumba, Mulenga; Nyirenda, Edwin
2017-12-01
The Government of the Republic Zambia (GRZ) will install a new hydropower station Kafue Gorge Lower downstream of the existing Kafue Gorge Station (KGS) and plans to start operating the Itezhi-Tezhi (ITT) hydropower facility in the Kafue Basin. The Basin has significant biodiversity hot spots such as the Luangwa National park and Kafue Flats. It is described as a Man-Biosphere reserve and the National Park is a designated World Heritage Site hosting a variety of wildlife species. All these natural reserves demand special protection, and environmental flow requirements (e-flows) have been identified as a necessary need to preserve these ecosystems. Implementation of e-flows is therefore a priority as Zambia considers to install more hydropower facilities. However before allocation of e-flows, it is necessary to first assess the river flow available for allocation at existing hydropower stations in the Kafue Basin. The river flow availability in the basin was checked by assessing the variability in low and high flows since the timing, frequency and duration of extreme droughts and floods (caused by low and high flows) are all important hydrological characteristics of a flow regime that affects e-flows. The river flows for a 41 year monthly time series data (1973-2014) were used to extract independent low and high flows using the Water Engineering Time Series Processing Tool (WETSPRO). The low and high flows were used to construct cumulative frequency distribution curves that were compared and analysed to show their variation over a long period. A water balance of each hydropower station was used to check the river flow allocation aspect by comparing the calculated water balance outflow (river flow) with the observed river flow, the hydropower and consumptive water rights downstream of each hydropower station. In drought periods about 50-100 m3/s of riverflow is available or discharged at both ITT and KGS stations while as in extreme flood events about 1300-1500 m3/s of riverflow is available. There is river flow available in the wet and dry seasons for e-flow allocation at ITT. On average per month 25 m3/s is allocated for e-flows at ITT for downstream purposes. On the other hand, it may be impossible to implement e-flows at KGS with the limited available outflow (river flow). The available river flow from ITT plays a very vital role in satisfying the current hydropower generating capacity at KGS. Therefore, the operations of KGS heavily depends on the available outflow (river flow) from ITT.
Making a Difference Through Engineer Capacity Building in Africa
2014-05-22
expense is 10 percent in Africa whereas in China energy it is only 3 percent.37 A lack of transportation infrastructure in Africa means that businesses...Africa. In 2012, China committed to provide $20 billion in loans for agriculture and infrastructure development. While this level of aid is roughly the...using wind, solar, hydropower, natural gas, and geothermal sources. This program is being executed in six sub-Saharan African nations. They are
Thayer Lake Hydropower Development -- Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matousek, Mark
The Thayer Lake Hydropower Development (THLD) has been under study since the late 1970’s as Angoon explored opportunities to provide lower cost renewable power to the Community and avoid the high cost of diesel generation. Kootznoowoo Inc. (Kootznoowoo), the tribal corporation for Angoon’s current and past residents, was provided the rights by Congress to develop a hydropower project within the Admiralty Island National Monument. This grant (DE-EE0002504) by the Department of Energy’s (DOE’s) Office of Indian Energy and a matching grant from the Alaska Energy Authority (AEA) were provided to Kootznoowoo to enable the design, engineering and permitting of thismore » hydropower project on Thayer Creek. Prior to the grant, the USFS had performed a final environmental impact statement (FEIS) and issued a Record of Decision (ROD) in 2009 for a 1.2 MW hydropower project on Thayer Creek that would Angoon’s needs with substantial excess capacity for growth. Kootznoowoo hired Alaska Power & Telephone (AP&T) in 2013 to manage this project and oversee its development. AP&T and its subcontractors under Kootznoowoo’s guidance performed several activities, aligned with the task plan defined in the grant.« less
Climate impacts on hydropower and consequences for global electricity supply investment needs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, Sean W. D.; Hejazi, Mohamad; Kim, Son H.
Recent progress in global scale hydrological and dam modeling has allowed for the study of climate change impacts on global hydropower production. Here we explore the possible consequences of these impacts for the electricity supply sector. Regional hydropower projections are developed for two emissions scenarios by forcing a coupled global hydrological and dam model with downscaled, bias-corrected climate realizations derived from sixteen general circulation models. Consequent impacts on power sector composition and associated emissions and investment costs are explored using the Global Change Assessment Model (GCAM). Changes in hydropower generation resulting from climate change can shift power demands onto andmore » away from carbon intensive technologies, resulting in significant impacts on power sector CO2 emissions for certain world regions—primarily those located in Latin America, as well as Canada and parts of Europe. Reduced impacts of climate change on hydropower production under a low emissions scenario coincide with increased costs of marginal power generating capacity—meaning impacts on power sector investment costs are similar for high and low emissions scenarios. Individual countries where impacts on investment costs imply significant risks or opportunities are identified.« less
Determining the effect of key climate drivers on global hydropower production
NASA Astrophysics Data System (ADS)
Galelli, S.; Ng, J. Y.; Lee, D.; Block, P. J.
2017-12-01
Accounting for about 17% of total global electrical power production, hydropower is arguably the world's main renewable energy source and a key asset to meet Paris climate agreements. A key component of hydropower production is water availability, which depends on both precipitation and multiple drivers of climate variability acting at different spatial and temporal scales. To understand how these drivers impact global hydropower production, we study the relation between four patterns of ocean-atmosphere climate variability (i.e., El Niño Southern Oscillation, Pacific Decadal Oscillation, North Atlantic Oscillation, and Atlantic Multidecadal Oscillation) and monthly time series of electrical power production for over 1,500 hydropower reservoirs—obtained via simulation with a high-fidelity dam model forced with 20th century climate conditions. Notably significant relationships between electrical power productions and climate variability are found in many climate sensitive regions globally, including North and South America, East Asia, West Africa, and Europe. Coupled interactions from multiple, simultaneous climate drivers are also evaluated. Finally, we highlight the importance of using these climate drivers as an additional source of information within reservoir operating rules where the skillful predictability of inflow exists.
HOMER® Energy Modeling Software V2.63
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Tom
2003-12-31
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
HOMER® Energy Modeling Software V2.64
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Tom
2003-12-31
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
HOMER® Energy Modeling Software V2.65
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Tom
2008-12-31
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
HOMER® Energy Modeling Software V2.0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Tom
2003-12-31
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
HOMER® Energy Modeling Software V2.19
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Tom
2008-12-31
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
HOMER® Energy Modeling Software V2.67
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, Tom
2008-12-31
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
Low-head hydropower assessment of the Brazilian State of São Paulo
Artan, Guleid A.; Cushing, W. Matthew; Mathis, Melissa L.; Tieszen, Larry L.
2014-01-01
This study produced a comprehensive estimate of the magnitude of hydropower potential available in the streams that drain watersheds entirely within the State of São Paulo, Brazil. Because a large part of the contributing area is outside of São Paulo, the main stem of the Paraná River was excluded from the assessment. Potential head drops were calculated from the Digital Terrain Elevation Data,which has a 1-arc-second resolution (approximately 30-meter resolution at the equator). For the conditioning and validation of synthetic stream channels derived from the Digital Elevation Model datasets, hydrography data (in digital format) supplied by the São Paulo State Department of Energy and the Agência Nacional de Águas were used. Within the study area there were 1,424 rain gages and 123 streamgages with long-term data records. To estimate average yearly streamflow, a hydrologic regionalization system that divides the State into 21 homogeneous basins was used. Stream segments, upstream areas, and mean annual rainfall were estimated using geographic information systems techniques. The accuracy of the flows estimated with the regionalization models was validated. Overall, simulated streamflows were significantly correlated with the observed flows but with a consistent underestimation bias. When the annual mean flows from the regionalization models were adjusted upward by 10 percent, average streamflow estimation bias was reduced from -13 percent to -4 percent. The sum of all the validated stream reach mean annual hydropower potentials in the 21 basins is 7,000 megawatts (MW). Hydropower potential is mainly concentrated near the Serra do Mar mountain range and along the Tietê River. The power potential along the Tietê River is mainly at sites with medium and high potentials, sites where hydropower has already been harnessed. In addition to the annual mean hydropower estimates, potential hydropower estimates with flow rates with exceedance probabilities of 40 percent, 60 percent, and 90 percent were made.
NASA Astrophysics Data System (ADS)
Anghileri, D.; Castelletti, A.; Burlando, P.
2016-12-01
European energy markets have experienced dramatic changes in the last years because of the massive introduction of Variable Renewable Sources (VRSs), such as wind and solar power sources, in the generation portfolios in many countries. VRSs i) are intermittent, i.e., their production is highly variable and only partially predictable, ii) are characterized by no correlation between production and demand, iii) have negligible costs of production, and iv) have been largely subsidized. These features result in lower energy prices, but, at the same time, in increased price volatility, and in network stability issues, which pose a threat to traditional power sources because of smaller incomes and higher maintenance costs associated to a more flexible operation of power systems. Storage hydropower systems play an important role in compensating production peaks, both in term of excess and shortage of energy. Traditionally, most of the research effort in hydropower reservoir operation has focused on modeling and forecasting reservoir inflow as well as designing reservoir operation accordingly. Nowadays, price variability may be the largest source of uncertainty in the context of hydropower systems, especially when considering medium-to-large reservoirs, whose storage can easily buffer small inflow fluctuations. In this work, we compare the effects of uncertain inflow and energy price forecasts on hydropower production and profitability. By adding noise to historic inflow and price trajectories, we build a set of synthetic forecasts corresponding to different levels of predictability and assess their impact on reservoir operating policies and performances. The study is conducted on different hydropower systems, including storage systems and pumped-storage systems, with different characteristics, e.g., different inflow-capacity ratios. The analysis focuses on Alpine hydropower systems where the hydrological regime ranges from purely ice and snow-melt dominated to mixed snow-melt and rain-dominated regimes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2016-07-01
Publication summarizing how the United States Army Corps of Engineers (USACE) and Federal Regulatory Energy Commission (FERC) have developed a two-phased, coordinated approach to regulating non-federal hydropower projects.
IMPLEMENTING PRACTICAL PICO-HYDROPOWER
Deliverables for this proposal will be energy output data modeled from experimental testing of the hydropower unit and monitoring of the stormwater handling infrastructure in the GIS building; along with a design and engineering plan for implementation and building integrat...
Hydropower Manufacturing and Supply Chain Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cotrell, Jason R
Hydropower Manufacturing and Supply Chain Analysis presentation from the WPTO FY14-FY16 Peer Review. The project objective is to provide data and insights to inform investment strategies, policy, and other decisions to promote economic growth and manufacturing.
Freshwater ecosystems could become the biggest losers of the Paris Agreement.
Hermoso, Virgilio
2017-09-01
Securing access to energy for a growing population under the international commitment of reduction of greenhouse emissions requires increasing the contribution of renewable sources to the global share. Hydropower energy, which accounts for >80% of green energy, is experiencing a boom fostered by international investment mainly in developing countries. This boom could be further accelerated by the recent climate agreement reached in Paris. Despite its flexibility, hydropower production entails social, economic and ecological risks that need to be carefully considered before investing in the development of potentially thousands of planned hydropower projects worldwide. This is especially relevant given the weak or nonexistent legislation that regulates hydropower project approval and construction in many countries. I highlight the need for adequate policy to provide the Paris Agreement with new financial and planning mechanisms to avoid further and irreversible damage to freshwater ecosystem services and biodiversity. © 2017 John Wiley & Sons Ltd.
Regulatory Approaches for Adding Capacity to Existing Hydropower Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Levine, Aaron L.; Curtis, Taylor L.; Kazerooni, Borna
In 2015, hydroelectric generation accounted for more than 6 percent of total net electricity generation in the United States and 46 percent of electricity generation from all renewables. The United States has considerable hydroelectric potential beyond what is already being developed. Nearly 7 GW of this potential is found by adding capacity to existing hydropower facilities. To optimize the value of hydroelectric generation, the U.S. Department of Energy's Hydropower Vision Study highlights the importance of adding capacity to existing facilities. This report provides strategic approaches and considerations for Federal Energy Regulatory Commission licensed and exempt hydropower facilities seeking to increasemore » generation capacity, which may include increases from efficiency upgrades. The regulatory approaches reviewed for this report include capacity and non-capacity amendments, adding capacity during relicensing, and adding capacity when converting a license to a 10-MW exemption.« less
[Impacts of large hydropower station on benthic algal communities].
Jia, Xing-Huan; Jiang, Wan-Xiang; Li, Feng-Qing; Tang, Tao; Duan, Shu-Gui; Cai, Qing-Hua
2009-07-01
To investigate the impacts of large hydropower station in Gufu River on benthic algae, monthly samplings were conducted from September 2004 to June 2007 at the site GF04 which was impacted by the hydropower station, with the site GL03 in Gaolan River as reference. During sampling period, no significant differences were observed in the main physicochemical variables between GF04 and GL03, but the hydrodynamics differed significantly. GL03 was basically at a status of slow flow; while GF04, owing to the discharging from the reservoir, was at a riffle status during more than 60% of the sampling period. Such a difference in hydrodynamics induced significant differences in the community similarity of benthic algae and the relative abundance of unattached diatoms, erect diatoms, and stalked diatoms between GF04 and GL03, which could better reflect the impacts of irregular draw-off by large hydropower station on river eco-system.
NASA Astrophysics Data System (ADS)
Xiao, Jian; Zhang, Mingqiang; Tian, Haiping; Huang, Bo; Fu, Wenlong
2018-02-01
In this paper, a novel prognostics and health management system architecture for hydropower plant equipment was proposed based on fog computing and Docker container. We employed the fog node to improve the real-time processing ability of improving the cloud architecture-based prognostics and health management system and overcome the problems of long delay time, network congestion and so on. Then Storm-based stream processing of fog node was present and could calculate the health index in the edge of network. Moreover, the distributed micros-service and Docker container architecture of hydropower plants equipment prognostics and health management was also proposed. Using the micro service architecture proposed in this paper, the hydropower unit can achieve the goal of the business intercommunication and seamless integration of different equipment and different manufacturers. Finally a real application case is given in this paper.
Organizing environmental flow frameworks to meet hydropower mitigation needs
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamay, Ryan A.; Brewer, Shannon K.; Jager, Henriette I.
The global recognition of the importance of natural flow regimes to sustain the ecological integrity of river systems has led to increased societal pressure on the hydropower industry to change plant operations to improve downstream aquatic ecosystems. However, a complete reinstatement of natural flow regimes is often unrealistic when balancing water needs for ecosystems, energy production, and other human uses. Thus, stakeholders must identify a prioritized subset of flow prescriptions that meet ecological objectives in light of realistic constraints. Yet, isolating aspects of flow regimes to restore downstream of hydropower facilities is among the greatest challenges of environmental flow sciencemore » due, in part, to the sheer volume of available environmental flow tools in conjunction with complex negotiation-based regulatory procedures. Here, we propose an organizational framework that structures information and existing flow paradigms into a staged process that assists stakeholders in implementing environmental flows for hydropower facilities. The framework identifies areas where regulations fall short of the needed scientific process, and provide suggestions for stakeholders to ameliorate those situations through advanced preparation. We highlight the strengths of existing flow paradigms in their application to hydropower settings and suggest when and where tools are most applicable. In conclusion, our suggested framework increases the effectiveness and efficiency of the e-flow implementation process by rapidly establishing a knowledge base and decreasing uncertainty so more time can be devoted to filling knowledge gaps. As a result, the framework provides the structure for a coordinated research agenda to further the science of environmental flows related to hydropower environments.« less
Turner, Sean W D; Ng, Jia Yi; Galelli, Stefano
2017-07-15
An important and plausible impact of a changing global climate is altered power generation from hydroelectric dams. Here we project 21st century global hydropower production by forcing a coupled, global hydrological and dam model with three General Circulation Model (GCM) projections run under two emissions scenarios. Dams are simulated using a detailed model that accounts for plant specifications, storage dynamics, reservoir bathymetry and realistic, optimized operations. We show that the inclusion of these features can have a non-trivial effect on the simulated response of hydropower production to changes in climate. Simulation results highlight substantial uncertainty in the direction of change in globally aggregated hydropower production (~-5 to +5% change in mean global production by the 2080s under a high emissions scenario, depending on GCM). Several clearly impacted hotspots are identified, the most prominent of which encompasses the Mediterranean countries in southern Europe, northern Africa and the Middle East. In this region, hydropower production is projected to be reduced by approximately 40% on average by the end of the century under a high emissions scenario. After accounting for each country's dependence on hydropower for meeting its current electricity demands, the Balkans countries emerge as the most vulnerable (~5-20% loss in total national electricity generation depending on country). On the flipside, a handful of countries in Scandinavia and central Asia are projected to reap a significant increase in total electrical production (~5-15%) without investing in new power generation facilities. Copyright © 2017 Elsevier B.V. All rights reserved.
Turner, Sean W. D.; Ng, Jia Yi; Galelli, Stefano
2017-03-07
Here, an important and plausible impact of a changing global climate is altered power generation from hydroelectric dams. Here we project 21st century global hydropower production by forcing a coupled, global hydrological and dam model with three General Circulation Model (GCM) projections run under two emissions scenarios. Dams are simulated using a detailed model that accounts for plant specifications, storage dynamics, reservoir bathymetry and realistic, optimized operations. We show that the inclusion of these features can have a non-trivial effect on the simulated response of hydropower production to changes in climate. Simulation results highlight substantial uncertainty in the direction ofmore » change in globally aggregated hydropower production (~–5 to + 5% change in mean global production by the 2080s under a high emissions scenario, depending on GCM). Several clearly impacted hotspots are identified, the most prominent of which encompasses the Mediterranean countries in southern Europe, northern Africa and the Middle East. In this region, hydropower production is projected to be reduced by approximately 40% on average by the end of the century under a high emissions scenario. After accounting for each country's dependence on hydropower for meeting its current electricity demands, the Balkans countries emerge as the most vulnerable (~ 5–20% loss in total national electricity generation depending on country). On the flipside, a handful of countries in Scandinavia and central Asia are projected to reap a significant increase in total electrical production (~ 5–15%) without investing in new power generation facilities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, Sean W. D.; Ng, Jia Yi; Galelli, Stefano
Here, an important and plausible impact of a changing global climate is altered power generation from hydroelectric dams. Here we project 21st century global hydropower production by forcing a coupled, global hydrological and dam model with three General Circulation Model (GCM) projections run under two emissions scenarios. Dams are simulated using a detailed model that accounts for plant specifications, storage dynamics, reservoir bathymetry and realistic, optimized operations. We show that the inclusion of these features can have a non-trivial effect on the simulated response of hydropower production to changes in climate. Simulation results highlight substantial uncertainty in the direction ofmore » change in globally aggregated hydropower production (~–5 to + 5% change in mean global production by the 2080s under a high emissions scenario, depending on GCM). Several clearly impacted hotspots are identified, the most prominent of which encompasses the Mediterranean countries in southern Europe, northern Africa and the Middle East. In this region, hydropower production is projected to be reduced by approximately 40% on average by the end of the century under a high emissions scenario. After accounting for each country's dependence on hydropower for meeting its current electricity demands, the Balkans countries emerge as the most vulnerable (~ 5–20% loss in total national electricity generation depending on country). On the flipside, a handful of countries in Scandinavia and central Asia are projected to reap a significant increase in total electrical production (~ 5–15%) without investing in new power generation facilities.« less
Organizing environmental flow frameworks to meet hydropower mitigation needs
McManamay, Ryan A.; Brewer, Shannon K.; Jager, Henriette I.; ...
2016-06-25
The global recognition of the importance of natural flow regimes to sustain the ecological integrity of river systems has led to increased societal pressure on the hydropower industry to change plant operations to improve downstream aquatic ecosystems. However, a complete reinstatement of natural flow regimes is often unrealistic when balancing water needs for ecosystems, energy production, and other human uses. Thus, stakeholders must identify a prioritized subset of flow prescriptions that meet ecological objectives in light of realistic constraints. Yet, isolating aspects of flow regimes to restore downstream of hydropower facilities is among the greatest challenges of environmental flow sciencemore » due, in part, to the sheer volume of available environmental flow tools in conjunction with complex negotiation-based regulatory procedures. Here, we propose an organizational framework that structures information and existing flow paradigms into a staged process that assists stakeholders in implementing environmental flows for hydropower facilities. The framework identifies areas where regulations fall short of the needed scientific process, and provide suggestions for stakeholders to ameliorate those situations through advanced preparation. We highlight the strengths of existing flow paradigms in their application to hydropower settings and suggest when and where tools are most applicable. In conclusion, our suggested framework increases the effectiveness and efficiency of the e-flow implementation process by rapidly establishing a knowledge base and decreasing uncertainty so more time can be devoted to filling knowledge gaps. As a result, the framework provides the structure for a coordinated research agenda to further the science of environmental flows related to hydropower environments.« less
How run-of-river operation affects hydropower generation and value.
Jager, Henriette I; Bevelhimer, Mark S
2007-12-01
Regulated rivers in the United States are required to support human water uses while preserving aquatic ecosystems. However, the effectiveness of hydropower license requirements nationwide has not been demonstrated. One requirement that has become more common is "run-of-river" (ROR) operation, which restores a natural flow regime. It is widely believed that ROR requirements (1) are mandated to protect aquatic biota, (2) decrease hydropower generation per unit flow, and (3) decrease energy revenue. We tested these three assumptions by reviewing hydropower projects with license-mandated changes from peaking to ROR operation. We found that ROR operation was often prescribed in states with strong water-quality certification requirements and migratory fish species. Although benefits to aquatic resources were frequently cited, changes were often motivated by other considerations. After controlling for climate, the overall change in annual generation efficiency across projects because of the change in operation was not significant. However, significant decreases were detected at one quarter of individual hydropower projects. As expected, we observed a decrease in flow during peak demand at 7 of 10 projects. At the remaining projects, diurnal fluctuations actually increased because of operation of upstream storage projects. The economic implications of these results, including both producer costs and ecologic benefits, are discussed. We conclude that regional-scale studies of hydropower regulation, such as this one, are long overdue. Public dissemination of flow data, license provisions, and monitoring data by way of on-line access would facilitate regional policy analysis while increasing regulatory transparency and providing feedback to decision makers.
NASA Astrophysics Data System (ADS)
Marques, G.
2015-12-01
Biofuels such as ethanol from sugar cane remain an important element to help mitigate the impacts of fossil fuels on the atmosphere. However, meeting fuel demands with biofuels requires technological advancement for water productivity and scale of production. This may translate into increased water demands for biofuel crops and potential for conflicts with incumbent crops and other water uses including domestic, hydropower generation and environmental. It is therefore important to evaluate the effects of increased biofuel production on the verge of water scarcity costs and hydropower production. The present research applies a hydro-economic optimization model to compare different scenarios of irrigated biofuel and hydropower production, and estimates the potential tradeoffs. A case study from the Araguari watershed in Brazil is provided. These results should be useful to (i) identify improved water allocation among competing economic demands, (ii) support water management and operations decisions in watersheds where biofuels are expected to increase, and (iii) identify the impact of bio fuel production in the water availability and economic value. Under optimized conditions, adoption of sugar cane for biofuel production heavily relies on the opportunity costs of other crops and hydropower generation. Areas with a lower value crop groups seem more suitable to adopt sugar cane for biofuel when the price of ethanol is sufficiently high and the opportunity costs of hydropower productions are not conflicting. The approach also highlights the potential for insights in water management from studying regional versus larger scales bundled systems involving water use, food production and power generation.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610. i. FERC Contact: Janet Hutzel, (202) 502-8675 or janet[email protected] . j. Deadline for filing comments, recommendations, terms and...
NASA Astrophysics Data System (ADS)
Finger, David
2015-04-01
About 80% of the domestic energy production in Iceland comes from renewable energies. Hydropower accounts for about 20% this production, representing about 75% of the total electricity production in Iceland. In 2008 total electricity production from hydropower was about 12.5 TWh a-1, making Iceland a worldwide leader in hydropower production per capita. Furthermore, the total potential of hydroelectricity in Iceland is estimated to amount up to 220 TWh a-1. In this regard, hydrological modelling is an essential tool to adapt a sustainable management of water resources and estimate the potential of possible new sites for hydropower production. We used the conceptual lumped Hydrologiska Byråns Vattenbalansavdelning model (HBV) to estimate the potential of hydropower production in two remote areas in north-eastern Iceland (Leirdalshraun, a 274 km2 area above 595 m asl and Hafralónsá, a 946 km2 area above 235 m asl). The model parameters were determined by calibrating the model with discharge data from gauged sub catchments. Satellite snow cover images were used to constrain melt parameters of the model and assure adequate modelling of snow melt in the ungauged areas. This was particularly valuable to adequately estimate the contribution of snow melt, rainfall runoff and groundwater intrusion from glaciers outside the topographic boundaries of the selected watersheds. Runoff from the entire area potentially used for hydropower exploitation was estimated using the parameter sets of the gauged sub-catchments. Additionally, snow melt from the ungauged areas was validated with satellite based snow cover images, revealing a robust simulation of snow melt in the entire area. Based on the hydrological modelling the total amount of snow melt and rainfall runoff available in Leirdalshraun and Hafralónsá amounts up to 700 M m3 a-1 and 1000 M m3 a-1, respectively. These results reveal that the total hydropower potential of the two sites amounts up to 1.2 TWh a-1 hydroelectricity, accounting for about 10% of the current production in Iceland. These result are of eminent importance to embed sustainable and resilient based water management in discussions concerning future plans of national energy production.
NASA Astrophysics Data System (ADS)
Arias, M. E.; Farinosi, F.; Lee, E.; Livino, A.; Moorcroft, P. R.
2016-12-01
Brazil is the 2nd largest hydropower producer in the world, and this energy source will continue to be a priority in the country for the foreseeable decades. Yet, climate change is expected to alter the country's hydrological regime, in particular in the Amazon where most new hydropower development is occurring. In order to better assess the potential of hydropower projects in decades to come, it is important to evaluate how future hydrological regimes will affect their performance and suitability. This study quantifies the impacts of climate change and land use conversion on hydropower generation, and identifies mechanisms that could help energy planners to account for future changes. Using the largest network of dams in Brazil's national portfolio within a single watershed, the Tapaj's River, this study connects global and regional future environmental projections to daily river flows and operations of 37 dams with an overall potential capacity of 29.4 GW. We found that climate change could decrease hydropower potential by 477-665 MW (-6 to -8% from historical conditions) during the dry season, a critical loss since dams are expected to operate at only one third of capacity during this perioddue to the limited reservoir volume of most projects in the Amazon lowlands. Furthermore, deforestation is expected to increase the inter-annual variability in hydropower potential from 2,798 for baseline conditions to 3,764-3,899 (+967-1102) MW under future scenarios for the 2040s. Consideration of future hydrological conditions on individual dams showed that the magnitude and uncertainty of losses could be greater than 30 MW -equivalent to the total potential of some dams in the inventory- in 11 of the projects studied. Future hydrological conditions could also delay the period when maximum daily generation occurs by 22-29 days, which could have important implications to energy planning in Brazil because these run-of-river dams would no longer be able to meet the country's seasonal peak demand. This information on future changes to individual dams' performance could feed directly into the project selection process in order to adapt designs and operations to ensure the greatest benefits and least impacts from hydropower in the long term.
NASA Astrophysics Data System (ADS)
Olivares, M. A.
2011-12-01
Hydropower accounts for about 50% of the installed capacity in Chile's Central Interconnected System (CIS) and new developments are envisioned in the near future. Large projects involving reservoirs are perceived negatively by the general public. In terms of operations, hydropower scheduling takes place at monthly, weekly, daily and hourly intervals, and operations at each level affect different environmental processes. Due to its ability to quickly and inexpensively respond to short-term changes in demand, hydropower reservoirs often are operated to provide power during periods of peak demand. This operational scheme, known as hydropeaking, changes the hydrologic regime by altering the rate and frequency of changes in flow magnitude on short time scales. To mitigate impacts on downstream ecosystems, operational constraints -typically minimum instream flows and maximum ramping rates- are imposed on hydropower plants. These operational restrictions limit reduce operational flexibility and can reduce the economic value of energy generation by imposing additional costs on the operation of interconnected power systems. Methods to predict the degree of hydrologic alteration rely on statistical analyses of instream flow time series. Typically, studies on hydrologic alteration use historical operational records for comparison between pre- and post-dam conditions. Efforts to assess hydrologic alteration based on future operational schemes of reservoirs are scarce. This study couples two existing models: a mid-term operations planning and a short-term economic dispatch to simulate short-term hydropower reservoir operations under different future scenarios. Scenarios of possible future configurations of the Chilean CIS are defined with emphasis on the introduction of non-conventional renewables (particularly wind energy) and large hydropower projects in Patagonia. Both models try to reproduce the actual decision making process in the Chilean Central Interconnected System (CIS). Chile's CIS is structured as a mandatory pool with audited costs and therefore the economic dispatch can be formulated as a cost minimization problem. Consequently, hydropower reservoir operations are controlled by the ISO. Reservoirs with the most potential to cause short-term hydrologic alteration were identified from existing operational records. These records have also been used to validate our simulated operations. Results in terms of daily and subdaily hydrologic alteration as well as the economic performance of the CIS are presented for alternative energy matrix scenarios. Tradeoff curves representing the compromise between indicators of hydrologic alteration and economic indicators of the CIS operation are developed.
Public Participation Guide: Proposed Popa Falls Hydropower Project, Okavango River, Namibia
The proposed hydropower project at Popa Falls case study illustrates the importance of carefully considering the scope of a public participation process when an environmental assessment is preliminary and when trans-boundary project impacts are a factor.
Climate impacts on hydropower and consequences for global electricity supply investment needs
Turner, Sean W. D.; Hejazi, Mohamad; Kim, Son H.; ...
2017-11-15
Climate change is projected to increase hydropower generation in some parts of the world and decrease it in others. Here we explore the possible consequences of these impacts for the electricity supply sector at the global scale. Regional hydropower projections are developed by forcing a coupled global hydrological and dam model with downscaled, bias-corrected climate realizations. Consequent impacts on power sector composition and associated emissions and investment costs are explored using the Global Change Assessment Model (GCAM). We find that climate-driven changes in hydropower generation may shift power demands onto and away from carbon intensive technologies. This then causes significantlymore » altered power sector CO 2 emissions in several hydro-dependent regions, although the net global impact is modest. For drying regions, we estimate a global, cumulative investment need of approximately one trillion dollars (±$500 billion) this century to make up for deteriorated hydropower generation caused by climate change. Total investments avoided are of a similar magnitude across regions projected to experience increased precipitation. Investment risks and opportunities are concentrated in hydro-dependent countries for which significant climate change is expected. Various countries throughout the Balkans, Latin America and Southern Africa are most vulnerable, whilst Norway, Canada, and Bhutan emerge as clear beneficiaries.« less
Regulation of snow-fed rivers affects flow regimes more than climate change.
Arheimer, B; Donnelly, C; Lindström, G
2017-07-05
River flow is mainly controlled by climate, physiography and regulations, but their relative importance over large landmasses is poorly understood. Here we show from computational modelling that hydropower regulation is a key driver of flow regime change in snow-dominated regions and is more important than future climate changes. This implies that climate adaptation needs to include regulation schemes. The natural river regime in snowy regions has low flow when snow is stored and a pronounced peak flow when snow is melting. Global warming and hydropower regulation change this temporal pattern similarly, causing less difference in river flow between seasons. We conclude that in snow-fed rivers globally, the future climate change impact on flow regime is minor compared to regulation downstream of large reservoirs, and of similar magnitude over large landmasses. Our study not only highlights the impact of hydropower production but also that river regulation could be turned into a measure for climate adaptation to maintain biodiversity on floodplains under climate change.Global warming and hydropower regulations are major threats to future fresh-water availability and biodiversity. Here, the authors show that their impact on flow regime over a large landmass result in similar changes, but hydropower is more critical locally and may have potential for climate adaptation in floodplains.
NASA Astrophysics Data System (ADS)
Lipiński, Seweryn; Olkowski, Tomasz
2017-10-01
The estimate of the cost of electro-mechanical equipment for new small hydropower plants most often amounts to about 30-40% of the total budget. In case of modernization of existing installations, this estimation represents the main cost. This matter constitutes a research problem for at least few decades. Many models have been developed for that purpose. The aim of our work was to collect and analyse formulas that allow estimation of the cost of investment in electro-mechanical equipment for small hydropower plants. Over a dozen functions were analysed. To achieve the aim of our work, these functions were converted into the form allowing their comparison. Then the costs were simulated with respect to plants' powers and net heads; such approach is novel and allows deeper discussion of the problem, as well as drawing broader conclusions. The following conclusions can be drawn: significant differences in results obtained by using various formulas were observed; there is a need for a wide study based on national investments in small hydropower plants that would allow to develop equations based on local data; the obtained formulas would let to determinate the costs of modernization or a new construction of small hydropower plant more precisely; special attention should be payed to formulas considering turbine type.
Climate impacts on hydropower and consequences for global electricity supply investment needs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, Sean W. D.; Hejazi, Mohamad; Kim, Son H.
Climate change is projected to increase hydropower generation in some parts of the world and decrease it in others. Here we explore the possible consequences of these impacts for the electricity supply sector at the global scale. Regional hydropower projections are developed by forcing a coupled global hydrological and dam model with downscaled, bias-corrected climate realizations. Consequent impacts on power sector composition and associated emissions and investment costs are explored using the Global Change Assessment Model (GCAM). We find that climate-driven changes in hydropower generation may shift power demands onto and away from carbon intensive technologies. This then causes significantlymore » altered power sector CO 2 emissions in several hydro-dependent regions, although the net global impact is modest. For drying regions, we estimate a global, cumulative investment need of approximately one trillion dollars (±$500 billion) this century to make up for deteriorated hydropower generation caused by climate change. Total investments avoided are of a similar magnitude across regions projected to experience increased precipitation. Investment risks and opportunities are concentrated in hydro-dependent countries for which significant climate change is expected. Various countries throughout the Balkans, Latin America and Southern Africa are most vulnerable, whilst Norway, Canada, and Bhutan emerge as clear beneficiaries.« less
NASA Astrophysics Data System (ADS)
Izat Rashed, Ghamgeen
2018-03-01
This paper presented a way of obtaining certain operating rules on time steps for the management of a large reservoir operation with a peak hydropower plant associated to it. The rules were allowed to have the form of non-linear regression equations which link a decision variable (here the water volume in the reservoir at the end of the time step) by several parameters influencing it. This paper considered the Dokan hydroelectric development KR-Iraq, which operation data are available for. It was showing that both the monthly average inflows and the monthly power demands are random variables. A model of deterministic dynamic programming intending the minimization of the total amount of the squares differences between the demanded energy and the generated energy is run with a multitude of annual scenarios of inflows and monthly required energies. The operating rules achieved allow the efficient and safe management of the operation and it is quietly and accurately known the forecast of the inflow and of the energy demand on the next time step.
NASA Astrophysics Data System (ADS)
Mehta, V. K.; Purkey, D. R.; Young, C.; Joyce, B.; Yates, D.
2008-12-01
Rivers draining western slopes of the Sierra Nevada provide critical water supply, hydropower, fisheries and recreation services to California. Coordinated efforts are under way to better characterize and model the possible impacts of climate change on Sierra Nevada hydrology. Research suggests substantial end-of- century reductions in Sierra Nevada snowpack and a shift in the center of mass of the snowmelt hydrograph. Management decisions, land use change and population growth add further complexity, necessitating the use of scenario-based modeling tools. The Water Evaluation and Planning (WEAP) system is one of the suite of tools being employed in this effort. Unlike several models that rely on perturbation of historical runoff data to simulate future climate conditions, WEAP includes a dynamically integrated watershed hydrology module that is forced by input climate time series. This allows direct simulation of water management response to climate and land use change. This paper presents ABY2008, a WEAP application for the Yuba, Bear and American River (ABY) watersheds of the Sierra Nevada. These rivers are managed by water agencies and hydropower utilities through a complex network of reservoirs, dams, hydropower plants and water conveyances. Historical watershed hydrology in ABY2008 is driven by a 10 year weekly climate time series from 1991-2000. Land use and soils data were combined into 12 landclasses representing each of 324 hydrological response units. Hydrologic parameters were incorporated from a calibration against observed streamflow developed for the entire western Sierra. Physical reservoir data, operating rules, and water deliveries to water agencies were obtained from public documents of water agencies and power utilities that manage facilities in the watersheds. ABY2008 includes 25 major reservoirs, 39 conveyances, 33 hydropower plants and 14 transmission links to 13 major water demand points. In WEAP, decisions for transferring water at diversion points from rivers to facilities are based on assigned priorities. Priorities in ABY2008 follow Federal Energy Regulatory Commission license requirements and power purchase agreements between licensees and water/power contractors. These generally allocate water according to the following priorities - (i) maintaining minimum instream flows below diversions;(ii) irrigation and domestic consumptive water demands; and (iii) power generation. ABY2008 simulations compared well with historical annual and monthly hydropower generation. Annual hydropower for 31 hydropower plants was simulated with r2=0.85 and ste=58 GWh. Monthly hydropower for 21 power plants owned by three water agencies were simulated with r2= 0.74 and ste= 7.4 GWh. We also present early results on how climate change, manifest by increasing weekly average temperatures, translates into changes in the projected timing of runoff and patterns of snow accumulation. Consequent changes in met water supply demands and hydropower generated are discussed. Further, stakeholders in the northern Sierra seek to use ABY2008 to investigate management scenarios geared towards increased conservation flows for fish populations, and the possible tradeoffs thereof with hydropower and water supply. These applications with ABY2008 illustrate the substantial utility of scenario-based modeling with the WEAP system.
Regulatory approaches for addressing dissolved oxygen concerns at hydropower facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Mark J.; Cada, Glenn F.; Sale, Michael J.
Low dissolved oxygen (DO) concentrations are a common water quality problem downstream of hydropower facilities. At some facilities, structural improvements (e.g. installation of weir dams or aerating turbines) or operational changes (e.g., spilling water over the dam) can be made to improve DO levels. In other cases, structural and operational approaches are too costly for the project to implement or are likely to be of limited effectiveness. Despite improvements in overall water quality below dams in recent years, many hydropower projects are unable to meet state water quality standards for DO. Regulatory agencies in the U.S. are considering or implementingmore » dramatic changes in their approach to protecting the quality of the Nation’s waters. New policies and initiatives have emphasized flexibility, increased collaboration and shared responsibility among all parties, and market-based, economic incentives. The use of new regulatory approaches may now be a viable option for addressing the DO problem at some hydropower facilities. This report summarizes some of the regulatory-related options available to hydropower projects, including negotiation of site-specific water quality criteria, use of biological monitoring, watershed-based strategies for the management of water quality, and watershed-based trading. Key decision points center on the health of the local biological communities and whether there are contributing impacts (i.e., other sources of low DO effluents) in the watershed. If the biological communities downstream of the hydropower project are healthy, negotiation for site-specific water quality standards or biocriteria (discharge performance criteria based on characteristics of the aquatic biota) might be pursued. If there are other effluent dischargers in the watershed that contribute to low DO problems, watershed-scale strategies and effluent trading may be effective. This report examines the value of regulatory approaches by reviewing their use in other« less
Along-the-net reconstruction of hydropower potential with consideration of anthropic alterations
NASA Astrophysics Data System (ADS)
Masoero, A.; Claps, P.; Gallo, E.; Ganora, D.; Laio, F.
2014-09-01
Even in regions with mature hydropower development, requirements for stable renewable power sources suggest revision of plans of exploitation of water resources, while taking care of the environmental regulations. Mean Annual Flow (MAF) is a key parameter when trying to represent water availability for hydropower purposes. MAF is usually determined in ungauged basins by means of regional statistical analysis. For this study a regional estimation method consistent along-the-river network has been developed for MAF estimation; the method uses a multi-regressive approach based on geomorphoclimatic descriptors, and it is applied on 100 gauged basins located in NW Italy. The method has been designed to keep the estimates of mean annual flow congruent at the confluences, by considering only raster-summable explanatory variables. Also, the influence of human alterations in the regional analysis of MAF has been studied: impact due to the presence of existing hydropower plants has been taken into account, restoring the "natural" value of runoff through analytical corrections. To exemplify the representation of the assessment of residual hydropower potential, the model has been applied extensively to two specific mountain watersheds by mapping the estimated mean flow for the basins draining into each pixel of a the DEM-derived river network. Spatial algorithms were developed using the OpenSource Software GRASS GIS and PostgreSQL/PostGIS. Spatial representation of the hydropower potential was obtained using different mean flow vs hydraulic-head relations for each pixel. Final potential indices have been represented and mapped through the Google Earth platform, providing a complete and interactive picture of the available potential, useful for planning and regulation purposes.
Wind-Driven Ecological Flow Regimes Downstream from Hydropower Dams
NASA Astrophysics Data System (ADS)
Kern, J.; Characklis, G. W.
2012-12-01
Conventional hydropower can be turned on and off quicker and less expensively than thermal generation (coal, nuclear, or natural gas). These advantages enable hydropower utilities to respond to rapid fluctuations in energy supply and demand. More recently, a growing renewable energy sector has underlined the need for flexible generation capacity that can complement intermittent renewable resources such as wind power. While wind power entails lower variable costs than other types of generation, incorporating it into electric power systems can be problematic. Due to variable and unpredictable wind speeds, wind power is difficult to schedule and must be used when available. As a result, integrating large amounts of wind power into the grid may result in atypical, swiftly changing demand patterns for other forms of generation, placing a premium on sources that can be rapidly ramped up and down. Moreover, uncertainty in wind power forecasts will stipulate increased levels of 'reserve' generation capacity that can respond quickly if real-time wind supply is less than expected. These changes could create new hourly price dynamics for energy and reserves, altering the short-term financial signals that hydroelectric dam operators use to schedule water releases. Traditionally, hourly stream flow patterns below hydropower dams have corresponded in a very predictable manner to electricity demand, whose primary factors are weather (hourly temperature) and economic activity (workday hours). Wind power integration has the potential to yield more variable, less predictable flows at hydro dams, flows that at times could resemble reciprocal wind patterns. An existing body of research explores the impacts of standard, demand-following hydroelectric dams on downstream ecological flows; but weighing the benefits of increased reliance on wind power against further impacts to ecological flows may be a novel challenge for the environmental community. As a preliminary step in meeting this challenge, the following study was designed to investigate the potential for wind power integration to alter riparian flow regimes below hydroelectric dams. A hydrological model of a three-dam cascade in the Roanoke River basin (Virginia, USA) is interfaced with a simulated electricity market (i.e. a unit commitment problem) representing the Dominion Zone of PJM Interconnection. Incorporating forecasts of electricity demand, hydro capacity and wind availability, a mixed-integer optimization program minimizes the system cost of meeting hourly demand and reserve requirements by means of a diverse generation portfolio (e.g. nuclear, fossil, hydro, and biomass). A secondary 'balancing' energy market is executed if real-time wind generation is less than the day-ahead forecast, calling upon reserved generation resources to meet the supply shortfall. Hydropower release schedules are determined across a range of wind development scenarios (varying wind's fraction of total installed generating capacity, as well as its geographical source region). Flow regimes for each wind development scenario are compared against both historical and simulated flows under current operations (negligible wind power), as well as simulated natural flows (dam removal), in terms of ecologically relevant flow metrics. Results quantify the ability of wind power development to alter within-week stream flows downstream from hydropower dams.
Climate Change Impacts and Greenhouse Gas Mitigation Effects on U.S. Hydropower Generation
Climate change will have potentially significant effects on hydropower generation due to changes in the magnitude and seasonality of river runoff and increases in reservoir evaporation. These physical impacts will in turn have economic consequences through both producer revenues ...
77 FR 64106 - Renewable Energy and Energy Efficiency Trade Policy Mission to Chile
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-18
... competitiveness of U.S. wind, solar, geothermal, biomass, hydropower, waste-to-energy, smart grid, and energy... development. Opportunities are expected in the wind, solar, geothermal, biomass, hydropower, and energy... DEPARTMENT OF COMMERCE International Trade Administration Renewable Energy and Energy Efficiency...
Sarasúa, José Ignacio; Elías, Paz; Martínez-Lucas, Guillermo; Pérez-Díaz, Juan Ignacio; Wilhelmi, José Román; Sánchez, José Ángel
2014-01-01
Run-of-river hydropower plants usually lack significant storage capacity; therefore, the more adequate control strategy would consist of keeping a constant water level at the intake pond in order to harness the maximum amount of energy from the river flow or to reduce the surface flooded in the head pond. In this paper, a standard PI control system of a run-of-river diversion hydropower plant with surge tank and a spillway in the head pond that evacuates part of the river flow plant is studied. A stability analysis based on the Routh-Hurwitz criterion is carried out and a practical criterion for tuning the gains of the PI controller is proposed. Conclusions about the head pond and surge tank areas are drawn from the stability analysis. Finally, this criterion is applied to a real hydropower plant in design state; the importance of considering the spillway dimensions and turbine characteristic curves for adequate tuning of the controller gains is highlighted.
Sarasúa, José Ignacio; Elías, Paz; Wilhelmi, José Román; Sánchez, José Ángel
2014-01-01
Run-of-river hydropower plants usually lack significant storage capacity; therefore, the more adequate control strategy would consist of keeping a constant water level at the intake pond in order to harness the maximum amount of energy from the river flow or to reduce the surface flooded in the head pond. In this paper, a standard PI control system of a run-of-river diversion hydropower plant with surge tank and a spillway in the head pond that evacuates part of the river flow plant is studied. A stability analysis based on the Routh-Hurwitz criterion is carried out and a practical criterion for tuning the gains of the PI controller is proposed. Conclusions about the head pond and surge tank areas are drawn from the stability analysis. Finally, this criterion is applied to a real hydropower plant in design state; the importance of considering the spillway dimensions and turbine characteristic curves for adequate tuning of the controller gains is highlighted. PMID:25405237
Exemplary Design Envelope Specification for Standard Modular Hydropower Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam M.; Smith, Brennan T.; Tsakiris, Achilleas
Hydropower is an established, affordable renewable energy generation technology supplying nearly 18% of the electricity consumed globally. A hydropower facility interacts continuously with the surrounding water resource environment, causing alterations of varying magnitude in the natural flow of water, energy, fish, sediment, and recreation upstream and downstream. A universal challenge in facility design is balancing the extraction of useful energy and power system services from a stream with the need to maintain ecosystem processes and natural environmental function. On one hand, hydroelectric power is a carbon-free, renewable, and flexible asset to the power system. On the other, the disruption ofmore » longitudinal connectivity and the artificial barrier to aquatic movement created by hydraulic structures can produce negative impacts that stress fresh water environments. The growing need for carbon-free, reliable, efficient distributed energy sources suggests there is significant potential for hydropower projects that can deploy with low installed costs, enhanced ecosystem service offerings, and minimal disruptions of the stream environment.« less
Development of the cycloidal propeller StECon as a new small hydropower plant for kinetic energy
NASA Astrophysics Data System (ADS)
Schmidt, J.; Jensen, J.; Wieland, J.; Lohr, W.; Metzger, J.; Stiller, H.-L.
2016-11-01
The StECon (Stiller Energy Converter) is a promising new small hydropower plant for kinetic energy. It is an invention of Mr. Hans-Ludwig Stiller and has several advantages compared to the technologies for the use of hydropower known for millennia. It runs completely submerged forwards and backwards, with horizontal or vertical axis and has a compact design by using a single or a double-sided planetary gear with optimum alignment to the flow direction. The possible applications include mobile and stationary tide and current generators as well as hybrid solutions, either as a generator or as a propulsion system. The high expectations have to be confirmed in a research project StEwaKorad at the University of Siegen. Aim of this research project is to investigate the performance and characteristics of the StECon as an energy converter for producing renewable energy from hydropower with low fall heights including sea currents.
A geospatial assessment of mini/small hydropower potential in Sub-Saharan Africa
NASA Astrophysics Data System (ADS)
Korkovelos, Alexandros; Mentis, Dimitrios; Hussain Siyal, Shahid; Arderne, Christopher; Beck, Hylke; de Roo, Ad; Howells, Mark
2017-04-01
Sub-Saharan Africa has been the epicenter of ongoing global dialogues around energy poverty and justifiably so. More than half of the world's unserved population lives there. At the same time, a big part of the continent is privileged with plentiful renewable energy resources. Hydropower is one of them and to a large extent it remains untapped. This study focuses on the technical assessment of small-scale hydropower (0.01-10 MW) in Sub-Saharan Africa. The underlying methodology was based on open source geospatial datasets, whose combination allowed a consistent evaluation of 712,615 km of river network spanning over 44 countries. Environmental, topological and social constraints were included in the form of geospatial restrictions to help preserve the natural wealth and promote sustainable development. The results revealed that small-scale hydropower could cover 8.5-12.5% of the estimated electricity demand in 2030, thus making it a viable option to support electrification efforts in the region.
Treatise on water hammer in hydropower standards and guidelines
NASA Astrophysics Data System (ADS)
Bergant, A.; Karney, B.; Pejović, S.; Mazij, J.
2014-03-01
This paper reviews critical water hammer parameters as they are presented in official hydropower standards and guidelines. A particular emphasize is given to a number of IEC standards and guidelines that are used worldwide. The paper critically assesses water hammer control strategies including operational scenarios (closing and opening laws), surge control devices (surge tank, pressure regulating valve, flywheel, etc.), redesign of the water conveyance system components (tunnel, penstock), or limitation of operating conditions (limited operating range) that are variably covered in standards and guidelines. Little information is given on industrial water hammer models and solutions elsewhere. These are briefly introduced and discussed in the light of capability (simple versus complex systems), availability of expertise (in house and/or commercial) and uncertainty. The paper concludes with an interesting water hammer case study referencing the rules and recommendations from existing hydropower standards and guidelines in a view of effective water hammer control. Recommendations are given for further work on development of a special guideline on water hammer (hydraulic transients) in hydropower plants.
Hydropower generation, flood control and dam cascades: A national assessment for Vietnam
NASA Astrophysics Data System (ADS)
Nguyen-Tien, Viet; Elliott, Robert J. R.; Strobl, Eric A.
2018-05-01
Vietnam is a country with diverse terrain and climatic conditions and a dependency on hydropower for a significant proportion of its power needs and as such, is particularly vulnerable to changes in climate. In this paper we apply SWAT (Soil and Water Assessment Tool) derived discharge simulation results coupled with regression analysis to estimate the performance of hydropower plants for Vietnam between 1995 and mid-2014 when both power supply and demand increased rapidly. Our approach is to examine the watershed formed from three large inter-boundary basins: The Red River, the Vietnam Coast and the Lower Mekong River, which have a total area of 977,964 km2. We then divide this area into 7,887 sub-basins with an average area of 131.6 km2 (based on level 12 of HydroSHEDS/HydroBASINS datasets) and 53,024 Hydrological Response Units (HRUs). Next we simulate river flow for the 40 largest hydropower plants across Vietnam. Our validation process demonstrates that the simulated flows are significantly correlated with the gauged inflows into these dams and are able to serve as a good proxy for the inflows into hydropower dams in our baseline energy regression, which captures 87.7% of the variation in monthly power generation. In other results we estimate that large dams sacrifice on average around 18.2% of their contemporaneous production for the purpose of flood control. When we assess Vietnam's current alignment of dams we find that the current cascades of large hydropower dams appear to be reasonably efficient: each MWh/day increase in upstream generation adds 0.146 MWh/day to downstream generation. The study provides evidence for the multiple benefits of a national system of large hydropower dams using a cascade design. Such a system may help overcome future adverse impacts from changes in climate conditions. However, our results show that there is still room for improvement in the harmonization of cascades in some basins. Finally, possible adverse hydro-ecological impacts due to the proliferation of large upstream dams, including those located beyond Vietnam's border, need to be carefully considered.
NASA Astrophysics Data System (ADS)
Arias, M. E.; Piman, T.; Lauri, H.; Cochrane, T. A.; Kummu, M.
2014-12-01
River tributaries have a key role in the biophysical functioning of the Mekong Basin. Of particular interest are the Sesan, Srepok, and Sekong (3S) rivers, which contribute nearly a quarter of the total Mekong discharge. Forty two dams are proposed in the 3S, and once completed they will exceed the active storage of China's large dam cascade in the Upper Mekong. Given their proximity to the Lower Mekong floodplains, the 3S dams could alter the flood-pulse hydrology driving the productivity of downstream ecosystems. Therefore, the main objective of this study was to quantify how hydropower development in the 3S, together with definite future (DF) plans for infrastructure development through the basin, would alter the hydrology of the Tonle Sap's Floodplain, the largest wetland in the Mekong and home to one of the most productive inland fisheries in the world. We coupled results from four numerical models representing the basin's surface hydrology, water resources development, and floodplain hydrodynamics. The scale of alterations caused by hydropower in the 3S was compared with the basin's DF scenario driven by the Upper Mekong dam cascade. The DF or the 3S development scenarios could independently increase Tonle Sap's 30-day minimum water levels by 30 ± 5 cm and decrease annual water level fall rates by 0.30 ± 0.05 cm day-1. When analyzed together (DF + 3S), these scenarios are likely to eliminate all baseline conditions (1986-2000) of extreme low water levels, a particularly important component of Tonle Sap's environmental flows. Given the ongoing trends and large economic incentives in the hydropower business in the region, there is a high possibility that most of the 3S hydropower potential will be exploited and that dams will be built even in locations where there is a high risk of ecological disruption. Hence, retrofitting current designs and operations to promote sustainable hydropower practices that optimize multiple river services - rather than just maximize hydropower generation - appear to be the most feasible alternative to mitigate hydropower-related disruptions in the Mekong.
NASA Astrophysics Data System (ADS)
Arias, M. E.; Piman, T.; Lauri, H.; Cochrane, T. A.; Kummu, M.
2014-02-01
River tributaries have a key role in the biophysical functioning of the Mekong Basin. Of particular attention are the Sesan, Srepok, and Sekong (3S) rivers, which contribute nearly a quarter of the total Mekong discharge. Forty two dams are proposed in the 3S, and once completed they will exceed the active storage of China's large dam cascade in the upper Mekong. Given their proximity to the lower Mekong floodplains, the 3S dams could alter the flood-pulse hydrology driving the productivity of downstream ecosystems. Therefore, the main objective of this study was to quantify how hydropower development in the 3S would alter the hydrology of the Tonle Sap floodplain, the largest wetland in the Mekong and home to one of the most productive inland fisheries in the world. We coupled results from four numerical models representing the basin's surface hydrology, water resources development, and floodplain hydrodynamics. The scale of alterations caused by hydropower in the 3S was compared with the basin's definite future development scenario (DF) driven by the upper Mekong dam cascade. The DF or the 3S development scenarios could independently increase Tonle Sap's 30 day minimum water levels by 30 ± 5 cm and decrease annual water level fall rates by 0.30 ± 0.05 cm d-2. When analyzed together (DF + 3S), these scenarios are likely to eliminate all baseline conditions (1986-2000) of extreme low water levels, a particularly important component of Tonle Sap's environmental flows. Given the ongoing trends and large economic incentives in the hydropower business in the region, there is a high possibility that most of the 3S hydropower potential will actually be exploited and that dams would be built even in locations where there is a high risk of ecological disruptions. Hence, retrofitting current designs and operations to promote sustainable hydropower practices that optimize multiple river services - rather than just maximize hydropower generation - appear to be the most feasible alternative to mitigate hydropower-related disruptions in the Mekong.
Projected impacts of climate change on hydropower potential in China
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, Xingcai; Tang, Qiuhong; Voisin, Nathalie
Hydropower is an important renewable energy source in China, but it is sensitive to climate change, because the changing climate may alter hydrological conditions (e.g., river flow and reservoir storage). Future changes and associated uncertainties in China's gross hydropower potential (GHP) and developed hydropower potential (DHP) are projected using simulations from eight global hydrological models (GHMs), including a large-scale reservoir regulation model, forced by five general circulation models (GCMs) with climate data under two representative concentration pathways (RCP2.6 and RCP8.5). Results show that the estimation of the present GHP of China is comparable to other studies; overall, the annual GHP is projectedmore » to change by −1.7 to 2 % in the near future (2020–2050) and increase by 3 to 6 % in the late 21st century (2070–2099). The annual DHP is projected to change by −2.2 to −5.4 % (0.7–1.7 % of the total installed hydropower capacity (IHC)) and −1.3 to −4 % (0.4–1.3 % of total IHC) for 2020–2050 and 2070–2099, respectively. Regional variations emerge: GHP will increase in northern China but decrease in southern China – mostly in south central China and eastern China – where numerous reservoirs and large IHCs currently are located. The area with the highest GHP in southwest China will have more GHP, while DHP will reduce in the regions with high IHC (e.g., Sichuan and Hubei) in the future. The largest decrease in DHP (in %) will occur in autumn or winter, when streamflow is relatively low and water use is competitive. Large ranges in hydropower estimates across GHMs and GCMs highlight the necessity of using multimodel assessments under climate change conditions. This study prompts the consideration of climate change in planning for hydropower development and operations in China, to be further combined with a socioeconomic analysis for strategic expansion.« less
NASA Astrophysics Data System (ADS)
Mainardi Fan, Fernando; Schwanenberg, Dirk; Alvarado, Rodolfo; Assis dos Reis, Alberto; Naumann, Steffi; Collischonn, Walter
2016-04-01
Hydropower is the most important electricity source in Brazil. During recent years, it accounted for 60% to 70% of the total electric power supply. Marginal costs of hydropower are lower than for thermal power plants, therefore, there is a strong economic motivation to maximize its share. On the other hand, hydropower depends on the availability of water, which has a natural variability. Its extremes lead to the risks of power production deficits during droughts and safety issues in the reservoir and downstream river reaches during flood events. One building block of the proper management of hydropower assets is the short-term forecast of reservoir inflows as input for an online, event-based optimization of its release strategy. While deterministic forecasts and optimization schemes are the established techniques for the short-term reservoir management, the use of probabilistic ensemble forecasts and stochastic optimization techniques receives growing attention and a number of researches have shown its benefit. The present work shows one of the first hindcasting and closed-loop control experiments for a multi-purpose hydropower reservoir in a tropical region in Brazil. The case study is the hydropower project (HPP) Três Marias, located in southeast Brazil. The HPP reservoir is operated with two main objectives: (i) hydroelectricity generation and (ii) flood control at Pirapora City located 120 km downstream of the dam. In the experiments, precipitation forecasts based on observed data, deterministic and probabilistic forecasts with 50 ensemble members of the ECMWF are used as forcing of the MGB-IPH hydrological model to generate streamflow forecasts over a period of 2 years. The online optimization depends on a deterministic and multi-stage stochastic version of a model predictive control scheme. Results for the perfect forecasts show the potential benefit of the online optimization and indicate a desired forecast lead time of 30 days. In comparison, the use of actual forecasts with shorter lead times of up to 15 days shows the practical benefit of actual operational data. It appears that the use of stochastic optimization combined with ensemble forecasts leads to a significant higher level of flood protection without compromising the HPP's energy production.
NASA Technical Reports Server (NTRS)
van Vliet, M. T. H.; van Beek, L. P. H.; Eisener, S.; Wada, Y.; Bierkens, M. F. P.
2016-01-01
Worldwide, 98% of total electricity is currently produced by thermoelectric power and hydropower. Climate change is expected to directly impact electricity supply, in terms of both water availability for hydropower generation and cooling water usage for thermoelectric power. Improved understanding of how climate change may impact the availability and temperature of water resources is therefore of major importance. Here we use a multi-model ensemble to show the potential impacts of climate change on global hydropower and cooling water discharge potential. For the first time, combined projections of streamflow and water temperature were produced with three global hydrological models (GHMs) to account for uncertainties in the structure and parametrization of these GHMs in both water availability and water temperature. The GHMs were forced with bias-corrected output of five general circulation models (GCMs) for both the lowest and highest representative concentration pathways (RCP2.6 and RCP8.5). The ensemble projections of streamflow and water temperature were then used to quantify impacts on gross hydropower potential and cooling water discharge capacity of rivers worldwide. We show that global gross hydropower potential is expected to increase between +2.4% (GCM-GHM ensemble mean for RCP 2.6) and +6.3% (RCP 8.5) for the 2080s compared to 1971-2000. The strongest increases in hydropower potential are expected for Central Africa, India, central Asia and the northern high-latitudes, with 18-33% of the world population living in these areas by the 2080s. Global mean cooling water discharge capacity is projected to decrease by 4.5-15% (2080s). The largest reductions are found for the United States, Europe, eastern Asia, and southern parts of South America, Africa and Australia, where strong water temperature increases are projected combined with reductions in mean annual streamflow. These regions are expected to affect 11-14% (for RCP2.6 and the shared socioeconomic pathway (SSP)1, SSP2, SSP4) and 41-51% (RCP8.5-SSP3, SSP5) of the world population by the 2080s.
A modeling tool to support decision making in future hydropower development in Chile
NASA Astrophysics Data System (ADS)
Vicuna, S.; Hermansen, C.; Cerda, J. P.; Olivares, M. A.; Gomez, T. I.; Toha, E.; Poblete, D.; Mao, L.; Falvey, M. J.; Pliscoff, P.; Melo, O.; Lacy, S.; Peredo, M.; Marquet, P. A.; Maturana, J.; Gironas, J. A.
2017-12-01
Modeling tools support planning by providing transparent means to assess the outcome of natural resources management alternatives within technical frameworks in the presence of conflicting objectives. Such tools, when employed to model different scenarios, complement discussion in a policy-making context. Examples of practical use of this type of tool exist, such as the Canadian public forest management, but are not common, especially in the context of developing countries. We present a tool to support the selection from a portfolio of potential future hydropower projects in Chile. This tool, developed by a large team of researchers under the guidance of the Chilean Energy Ministry, is especially relevant in the context of evident regionalism, skepticism and change in societal values in a country that has achieved a sustained growth alongside increased demands from society. The tool operates at a scale of a river reach, between 1-5 km long, on a domain that can be defined according to the scale needs of the related discussion, and its application can vary from river basins to regions or other spatial configurations that may be of interest. The tool addresses both available hydropower potential and the existence (inferred or observed) of other ecological, social, cultural and productive characteristics of the territory which are valuable to society, and provides a means to evaluate their interaction. The occurrence of each of these other valuable characteristics in the territory is measured by generating a presence-density score for each. Considering the level of constraint each characteristic imposes on hydropower development, they are weighted against each other and an aggregate score is computed. With this information, optimal trade-offs are computed between additional hydropower capacity and valuable local characteristics over the entire domain, using the classical knapsack 0-1 optimization algorithm. Various scenarios of different weightings and hydropower development targets are tested and compared. The results illustrate the capabilities of the tool to identify promising hydropower development strategies and to aid public policy discussions aimed at establishing incentives and regulations, and therefore provide decision makers with supporting material allowing a more informed discussion.
Climate Vulnerability of Hydro-power infrastructure in the Eastern African Power Pool
NASA Astrophysics Data System (ADS)
Sridharan, Vignesh
2017-04-01
At present there is around 6000 MW of installed hydropower capacity in the Eastern African power pool (EAPP)[1]. With countries aggressively planning to achieve the Sustainable development goal (SDG) of ensuring access to affordable electricity for all, a three-fold increase in hydropower capacity is expected by 2040 [1]. Most of the existing and planned infrastructure lie inside the Nile River Basin. The latest assessment report (AR 5) from the Intergovernmental Panel on Climate Change (IPCC) indicates a high level of climatic uncertainty in the Nile Basin. The Climate Moisture index (CMI) for the Eastern Nile region and the Nile Equatorial lakes varies significantly across the different General Circulation Models (GCM)[2]. Such high uncertainty casts a shadow on the plans to expand hydropower capacity, doubting whether hydropower expansion can contribute to the goal of improving access to electricity or end up as sunk investments. In this assessment, we analyze adaptation strategies for national energy systems in the Eastern African Power Pool (EAPP), which minimize the regret that could potentially arise from impacts of a changed climate. An energy systems model of the EAPP is developed representing national electricity supply infrastructure. Cross border transmission and hydropower infrastructure is defined at individual project level. The energy systems model is coupled with a water systems management model of the Nile River Basin that calculates the water availability at different hydropower infrastructures under a range of climate scenarios. The results suggest that a robust adaptation strategy consisting of investments in cross border electricity transmission infrastructure and diversifying sources of electricity supply will require additional investments of USD 4.2 billion by 2050. However, this leads to fuel and operational cost savings of up to USD 22.6 billion, depending on the climate scenario. [1] "Platts, 2016. World Electric Power Plants Database," World Electric Power Plants Database. [Online]. Available: http://www.platts.com/Products/worldelectricpowerplantsdatabase. [Accessed: 01-Mar-2016]. [2] Brent Boehlert, Kenneth M. Strzepek, David Groves, and Bruce Hewitson, Chris Jack, "Climate Change Projections in Africa-Chapter 3," in Enhancing the Climate Resilience of Africa's Infrastructure : The Power and Water Sectors, Washington DC: The World Bank, 2016, p. 219.
1983-05-01
tigations, Clemson, S. C . 29631 and U. S. Army ED- It. REPORT DATE gineer Waterways Experiment Station, Environmental May 1983 Laboratory, P. 0. Box 631...ON eport) Washington, D. C . 20314 Unclassified I&. NMITORING AGENCY NAME & ADORVESS( Idfieuf orn o C ..,bDIMi OW~~ IS. DECkASFCTO(ONRDN W DISTRIBUTION...Reservoir Research Program, U. S. Fish and Wildlife Ser- vice, Clemson, S. C .; and Drs. John Nestler and Gary Saul, EL, WES. Preparation of this report
Lock and Dam Number 8 Hydropower Study; Mississippi River Near LaCrosse, Wisconsin. Supplement.
1985-01-01
unit used in scheme 3 is a standardized module consisting of an axial flow turbine , a speed increasing gear set, and a generator combined in a short...the flow and generating head ranges associated with specific turbine generator sizes, the program produces annual and monthly flow -duration curves and...open flume turbine passing a rated flow of 14O0 eta at a rated head of 9.75 feat. Cost estimates were made for two and four unit plants having
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCoy, Gilbert A.
1992-12-01
The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCoy, Gilbert A.
1992-12-01
The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.
Simulation and Modeling Capability for Standard Modular Hydropower Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, Kevin M.; Smith, Brennan T.; Witt, Adam M.
Grounded in the stakeholder-validated framework established in Oak Ridge National Laboratory’s SMH Exemplary Design Envelope Specification, this report on Simulation and Modeling Capability for Standard Modular Hydropower (SMH) Technology provides insight into the concepts, use cases, needs, gaps, and challenges associated with modeling and simulating SMH technologies. The SMH concept envisions a network of generation, passage, and foundation modules that achieve environmentally compatible, cost-optimized hydropower using standardization and modularity. The development of standardized modeling approaches and simulation techniques for SMH (as described in this report) will pave the way for reliable, cost-effective methods for technology evaluation, optimization, and verification.
Dynamic evolution characteristics of a fractional order hydropower station system
NASA Astrophysics Data System (ADS)
Gao, Xiang; Chen, Diyi; Yan, Donglin; Xu, Beibei; Wang, Xiangyu
2018-01-01
This paper investigates the dynamic evolution characteristics of the hydropower station by introducing the fractional order damping forces. A careful analysis of the dynamic characteristics of the generator shaft system is carried out under different values of fractional order. It turns out the vibration state of the axis coordinates has a certain evolution law with the increase of the fractional order. Significantly, the obtained law exists in the horizontal evolution and vertical evolution of the dynamical behaviors. Meanwhile, some interesting dynamical phenomena were found in this process. The outcomes of this study enrich the nonlinear dynamic theory from the engineering practice of hydropower stations.
78 FR 79433 - Mahoning Hydropower, LLC, Ohio, Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
... Hydropower, LLC, Ohio, Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC) regulations.... Staff prepared an environmental assessment (EA), which analyzes the potential environmental effects of...
JPRS Report, Science & Technology China: Energy
1992-06-24
HYDROPOWER Speeding Up Hydropower Construction Through Improved Investment Conditions [Yang Zhirong, Qu Shiyuan , et ai; ZHONGGUO NENGYUAN, 25 Apr 92] 2...Beijing ZHONGGUO NENGYUAN [ENERGY OF CHINA] in Chinese No 4, 25 Apr 92 pp 4-7 [Article by Yang Zhirong [2799 1807 2837], Qu Shiyuan [3255 2514
Analysis on regulation strategies for extending service life of hydropower turbines
NASA Astrophysics Data System (ADS)
Yang, W.; Norrlund, P.; Yang, J.
2016-11-01
Since a few years, there has been a tendency that hydropower turbines experience fatigue to a greater extent, due to increasingly more regulation movements of governor actuators. The aim of this paper is to extend the service life of hydropower turbines, by reasonably decreasing the guide vane (GV) movements with appropriate regulation strategies, e.g. settings of PI (proportional-integral) governor parameters and controller filters. The accumulated distance and number of GV movements are the two main indicators of this study. The core method is to simulate the long-term GV opening of Francis turbines with MATLAB/Simulink, based on a sequence of one-month measurements of the Nordic grid frequency. Basic theoretical formulas are also discussed and compared to the simulation results, showing reasonable correspondence. Firstly, a model of a turbine governor is discussed and verified, based on on-site measurements of a Swedish hydropower plant. Then, the influence of governor parameters is discussed. Effects of different settings of controller filters (e.g. dead zone, floating dead zone and linear filter) are also examined. Moreover, a change in GV movement might affect the quality of the frequency control. This is also monitored via frequency deviation characteristics, determined by elementary simulations of the Nordic power system. The results show how the regulation settings affect the GV movements and frequency quality, supplying suggestions for optimizing the hydropower turbine operation for decreasing the wear and tear.
Exploring the hydropower potential of future ice-free glacier basins
NASA Astrophysics Data System (ADS)
Round, Vanessa; Farinotti, Daniel; Huss, Matthias
2017-04-01
The retreat of glaciers over the next century will present new challenges related to water availability and cause significant changes to the landscape. The construction of dams in areas becoming ice-free has previously been suggested as a mitigation measure against changes to water resources in the European Alps. In Switzerland, a number of hydropower dams already exist directly below glaciers, and the hydropower potential of natural lakes left by retreating glaciers has been recognised. We expand these concepts to the regional, and ultimately global, scale to assess the potential of creating hydropower dams in glacier basins, encouraged by advantages such as relatively low ecological and social impacts, and the possibility to replicate the water storage capabilities of glaciers. In a first order assessment, dam volumes are computed using a subglacial topography model and dam walls simulated at the terminus of each glacier. Potential power production is then estimated from projected glacier catchment runoff until 2100 based on the Global Glacier Evolution Model (GloGEM), and penstock head approximated from a global digital elevation model. Based on this, a feasibility ranking system is presented which takes into account various proxies for cost, demand and impact, such as proximity to populations and existing infrastructure, geological risks and threatened species. The ultimate objective is to identify locations of glacier retreat which could most feasibly and beneficially be used for hydropower production.
NASA Astrophysics Data System (ADS)
Piman, T.; Cochrane, T. A.; Arias, M. E.
2013-12-01
Water flow patterns in the Mekong River and its tributaries are changing due to water resources development, particularly as a result of on-going rapid hydropower development of tributaries for economic growth. Local communities and international observers are concerned that alterations of natural flow patterns will have great impacts on biodiversity, ecosystem services, food securing and livelihood in the basin. There is also concern that un-coordinated dam development will have an adverse impact on energy production potential of individual hydropower plants. Of immediate concern is the proposed hydropower development in the transboundary Srepok, Sesan and Srekong (3S) Basin, which contributes up to 20% of the Mekong's annual flows, has a large potential for energy production, and provides critical ecosystem services to local people and the downstream Tonle Sap Lake and the Mekong delta. To assess the magnitude of potential changes in flows and hydropower production, daily flows were simulated over 20 years (1986-2005) using the SWAT and HEC ResSim models for a range of dam development and operations scenarios. Simulations of all current and proposed hydropower development in the 3S basin (41 dams) using an operation scheme to maximize electricity production will increase average dry seasonal flows by 88.1% while average wet seasonal flows decrease by 24.7% when compared to the baseline (no dams) scenario, About 55% of dry season flows changes are caused by the seven largest proposed dams (Lower Srepok 3, Lower Srepok4, Lower Sesan 3, Lower Sesan and Srepok 2, Xekong 5, Xekong 4, and Xe Xou). The total active storage of the existing and ongoing hydropower projects is only 6,616 million m3 while the cumulative active storage of the seven large proposed dams is 17,679 million m3. The Lower Srepok 3 project causes the highest impact on seasonal flow changes. Average energy production of the existing and ongoing hydropower projects is 73.2 GWh/day. Additional benefits from energy production of the seven large proposed dams (33.0 GWh/day) are less than half compared to the cumulative benefits of the exiting and ongoing projects. In total, potential energy production of all dams is 129.1 GWh/day. Cascade dam simulations, under an independent operation regime, result in high electricity production of downstream dams, particularly of small storage dams. Hourly flow alterations, however, can be significant due to intra daily reservoir operations and warrant further study as well as impact of climate change on flows and hydropower operation. Strategic site selection and coordinated reservoir operations between countries and dam operators are necessary to achieve an acceptable level of energy production in the basin and mitigate negative impacts to seasonal flow patterns which sustain downstream ecosystem productivity and livelihoods.
78 FR 61999 - Hydropower Regulatory Efficiency Act of 2013; Supplemental Notice of Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-10
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD13-9-000] Hydropower Regulatory Efficiency Act of 2013; Supplemental Notice of Workshop As announced in the Notices issued on September 3, 2013 and September 18, 2013, the Federal Energy Regulatory Commission (FERC or Commission...
Hydropower Research | Water Power | NREL
facilities are available to support hydropower technology validation and design optimization. Photo of water optimized prior to expensive and time-consuming open-water validation. Photo of electric power lines at -machinery. Using these methodologies, tools, and direct industry data, they analyze the near- and long-term
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-22
... the Alternatives Process in Hydropower Licensing, OMB Control Number 1094-0001. FOR FURTHER... Interior, and Commerce collect the information covered by 1094-0001. Under FPA section 33, the Secretary of... Control Number: 1094-0001. Current Expiration Date: September 30, 2012. Type of Review: Information...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13795-000] Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Mahoning Hydropower, LLC June 10, 2010. On May 25, 2010, Mahoning Hydropower, LLC filed an...
76 FR 46287 - Erie Boulevard Hydropower, L.P.; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-02
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2047-049] Erie Boulevard Hydropower, L.P.; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC) regulations...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-11
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13877-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 4, 2011. On November 4, 2010, Mahoning Hydro, LLC...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guensch, Gregory R.; Mueller, Robert P.; McKinstry, Craig A.
As part of the research supported by U.S. Department of Energy (DOE) Advanced Hydropower Turbine System (AHTS) Program, the Pacific Northwest National Laboratory (PNNL) conducted a study where age-0 and age-1 Chinook salmon, as well as several other types of fish, were released into a submerged water jet to quantify injuries caused by shear stresses and turbulence (Neitzel et al. 2000). The fish releases were videotaped. These videotape records were digitized and analyzed using new methods to identify the injury mechanisms and the stresses involved. Visible external injuries sustained by fish in this study generally occurred during the initial contactmore » with the jet and not during the tumbling that occurred after the fish fully entered the turbulent flow. The inertial stresses of tumbling, however, may cause temporary or even permanent vestibular and neurological injuries. Such injuries can result in disorientation and loss of equilibrium, which are life threatening in the “natural” environment. Operculum injuries predominated at moderate water jet speeds (12 and 15 m/s). At the highest speed, eye, operculum, isthmus, and gill injuries were equally common, and disorientation was most common. Bruising and descaling were relatively rare, especially for age-0 fish. Age-0 fish were less susceptible than the larger age-1 fish to all visible injury types, especially at lower speeds.« less
Analysis and Research on the effect of the Operation of Small Hydropower in the Regional Power Grid
NASA Astrophysics Data System (ADS)
Ang, Fu; Guangde, Dong; Xiaojun, Zhu; Ruimiao, Wang; Shengyi, Zhu
2018-03-01
The analysis of reactive power balance and voltage of power network not only affects the system voltage quality, but also affects the economic operation of power grid. In the calculation of reactive power balance and voltage analysis in the past, the problem of low power and low system voltage has been the concern of people. When small hydropower stations in the wet period of low load, the analysis of reactive power surplus and high voltage for the system, if small hydropower unit the capability of running in phase is considered, it can effectively solve the system low operation voltage of the key point on the high side.
NASA Astrophysics Data System (ADS)
Li, Jiqing; Yang, Xiong
2018-06-01
In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of cascade hydro-power stations in large river basins. The typical annual runoff data are selected to calculate the difference between the calculated results under different representative years. The results show that the cascade operation of cascaded hydro-power stations can significantly increase the overall power generation of cascade and ease the flood risk caused by concentration of flood season.
78 FR 55251 - Hydropower Regulatory Efficiency Act of 2013; Notice of Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
... Regulatory Efficiency Act of 2013; Notice of Workshop The Federal Energy Regulatory Commission (FERC or... 6 of the Hydropower Regulatory Efficiency Act of 2013. Participants should be prepared to discuss... at https://www.ferc.gov/whats-new/registration/efficiency-act-10-02-13-form.asp by September 25, 2013...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
.... 791(a)-825(r). h. Applicant Contact: Duff Mitchell, Business Manager, Juneau Hydropower, Inc., P.O... information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnline... access the document. For assistance, contact FERC Online Support. You may also register online at http...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-21
...-diameter stream diversion tunnel that would be converted to reservoir outlet works after project... afterbay to an outlet structure on a tributary to Sweetheart Creek; and an existing tributary stream... Mitchell, Business Manager, Juneau Hydropower, Inc. P.O. Box 22775, Juneau, AK 99802; email: duff.mitchell...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-15
...-diameter stream diversion tunnel that would be converted to reservoir outlet works after project... afterbay to an outlet structure on a tributary to Sweetheart Creek; and an existing tributary stream... Mitchell, Business Manager, Juneau Hydropower, Inc. P.O. Box 22775, Juneau, AK 99802; email: duff.mitchell...
A Student Activity for the James Bay Hydro Project. The Geography Teacher.
ERIC Educational Resources Information Center
Green-Milberg, Patricia
1999-01-01
Provides activities for grades 6 to 8 that will promote student awareness and understanding of the use of hydropower in Canada, the benefits and drawbacks to hydropower, and also the drawbacks of electricity transmission lines. Explains that the activities focus on the James Bay Hydro Project in Canada. (CMK)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-09
...), as amended by HREA.... The facility is constructed, operated, or maintained Y for the generation of... Conduit Hydropower Facility Satisfies (Y/ Statutory provision Description N) FPA 30(a)(3)(A), as amended by HREA....... The conduit the facility uses is a tunnel, canal, Y pipeline, aqueduct, flume, ditch...
Over 50 hydropower dams in California will undergo relicensing by the Federal Energy Regulatory Commission (FERC) in the next 15 years. An interpretive framework for biological data collected by relicensing studies is lacking. This study developed a multi-metric index of biotic...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-22
... a Federal Government facility. Depending on the economic viability of the proposed hydropower.... Identify proposed methods of financing the hydropower development. An economic analysis should be presented... and provide for long-term operation and maintenance; and (3) best share the economic benefits of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Competing Applications; McKay Dam Hydropower, LLC On May 31, 2011, McKay Dam Hydropower, LLC filed an... study the feasibility of the McKay Dam Hydroelectric Project (project) to be located at the McKay dam near Pendleton in Umatilla County, [[Page 57732
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13953-002] Mahoning... available for public inspection. a. Type of Application: New Minor License. b. Project No.: 13953-002. c. Date filed: November 22, 2011. d. Applicant: Mahoning Hydropower, LLC. e. Name of Project: Lake Milton...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518-012--New York] Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review November 15, 2010. Commission staff will be conducting two public scoping meetings and an environmental site review in support...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications February 18, 2010. On November 5, 2009, Coastal Hydropower LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing...
18 CFR 2.23 - Use of reserved authority in hydropower licenses to ameliorate cumulative impacts.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Use of reserved authority in hydropower licenses to ameliorate cumulative impacts. 2.23 Section 2.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL...
18 CFR 2.23 - Use of reserved authority in hydropower licenses to ameliorate cumulative impacts.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Use of reserved authority in hydropower licenses to ameliorate cumulative impacts. 2.23 Section 2.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL...
18 CFR 2.23 - Use of reserved authority in hydropower licenses to ameliorate cumulative impacts.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Use of reserved authority in hydropower licenses to ameliorate cumulative impacts. 2.23 Section 2.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL...
18 CFR 2.23 - Use of reserved authority in hydropower licenses to ameliorate cumulative impacts.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Use of reserved authority in hydropower licenses to ameliorate cumulative impacts. 2.23 Section 2.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL...
Hydropower's Biogenic Carbon Footprint.
Scherer, Laura; Pfister, Stephan
2016-01-01
Global warming is accelerating and the world urgently needs a shift to clean and renewable energy. Hydropower is currently the largest renewable source of electricity, but its contribution to climate change mitigation is not yet fully understood. Hydroelectric reservoirs are a source of biogenic greenhouse gases and in individual cases can reach the same emission rates as thermal power plants. Little is known about the severity of their emissions at the global scale. Here we show that the carbon footprint of hydropower is far higher than previously assumed, with a global average of 173 kg CO2 and 2.95 kg CH4 emitted per MWh of electricity produced. This results in a combined average carbon footprint of 273 kg CO2e/MWh when using the global warming potential over a time horizon of 100 years (GWP100). Nonetheless, this is still below that of fossil energy sources without the use of carbon capture and sequestration technologies. We identified the dams most promising for capturing methane for use as alternative energy source. The spread among the ~1500 hydropower plants analysed in this study is large and highlights the importance of case-by-case examinations.
Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curtis, Taylor L.; Levine, Aaron L.; McLaughlin, Kathleen
This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potentialmore » at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.« less
Hydropower in Southeast United States, -a Hydroclimatological Perspective
NASA Astrophysics Data System (ADS)
Engstrom, J.
2016-12-01
Hydropower is unique among renewable energy sources for the ability to store its fuel (water) in reservoirs. The relationship between discharge, macro-scale drivers, and production is complex since production depends not only on water availability, but also upon decisions made by the institution owning the facility that has to consider many competing interests including economics, drinking water supply, recreational uses, etc. This analysis shows that the hydropower plants in Southeast U.S. (AL, GA, NC, SC, and TN) exhibit considerable year to year variability in production. Although the hydroclimatology of the Southeast U.S. has been analyzed partially, no previous study has linked the region's hydroelectricity production to any reported causes of interannual hydroclimatological variability, as has been completed in other regions. Due to the current short-term hydroelectricity production forecasts, the water resource is not optimized from a hydropower perspective as electricity generating potential is not maximized. The results of this study highlight the amount of untapped hydroelectricity that could be produced if long term hydroclimate and large-scale climate drivers were considered in production forecasts.
Improving hydropower choices via an online and open access tool
Vilela, Thais; Reid, John
2017-01-01
This paper describes and validates the HydroCalculator Tool developed by Conservation Strategy Fund. The HydroCalculator Tool allows researchers, policy-makers and citizens to easily assess hydropower feasibility, by calculating traditional financial indicators, such as the levelized cost of energy, as well as greenhouse gas emissions and the economic net present value including emissions costs. Currently, people other than project developers have limited or no access to such information, which stifles informed public debate on electric energy options. Within this context, the use of the HydroCalculator Tool may contribute to the debate, by facilitating access to information. To validate the tool’s greenhouse gas calculations, we replicate two peer-reviewed articles that estimate greenhouse gas emissions from different hydropower plants in the Amazon basin. The estimates calculated by the HydroCalculator Tool are similar to the ones found in both peer-reviewed articles. The results show that hydropower plants can lead to greenhouse gas emissions and that, in some cases, these emissions can be larger than those of alternative energy sources producing the same amount of electricity. PMID:28650968
Improving hydropower choices via an online and open access tool.
Vilela, Thais; Reid, John
2017-01-01
This paper describes and validates the HydroCalculator Tool developed by Conservation Strategy Fund. The HydroCalculator Tool allows researchers, policy-makers and citizens to easily assess hydropower feasibility, by calculating traditional financial indicators, such as the levelized cost of energy, as well as greenhouse gas emissions and the economic net present value including emissions costs. Currently, people other than project developers have limited or no access to such information, which stifles informed public debate on electric energy options. Within this context, the use of the HydroCalculator Tool may contribute to the debate, by facilitating access to information. To validate the tool's greenhouse gas calculations, we replicate two peer-reviewed articles that estimate greenhouse gas emissions from different hydropower plants in the Amazon basin. The estimates calculated by the HydroCalculator Tool are similar to the ones found in both peer-reviewed articles. The results show that hydropower plants can lead to greenhouse gas emissions and that, in some cases, these emissions can be larger than those of alternative energy sources producing the same amount of electricity.
Root Cause Failure Analysis of Stator Winding Insulation failure on 6.2 MW hydropower generator
NASA Astrophysics Data System (ADS)
Adhi Nugroho, Agus; Widihastuti, Ida; Ary, As
2017-04-01
Insulation failure on generator winding insulation occurred in the Wonogiri Hydropower plant has caused stator damage since ase was short circuited to ground. The fault has made the generator stop to operate. Wonogiri Hydropower plant is one of the hydroelectric plants run by PT. Indonesia Power UBP Mrica with capacity 2 × 6.2 MW. To prevent damage to occur again on hydropower generators, an analysis is carried out using Root Cause Failure Analysis RCFA is a systematic approach to identify the root cause of the main orbasic root cause of a problem or a condition that is not wanted. There are several aspects to concerned such as: loading pattern and operations, protection systems, generator insulation resistance, vibration, the cleanliness of the air and the ambient air. Insulation damage caused by gradual inhomogeneous cooling at the surface of winding may lead in to partial discharge. In homogeneous cooling may present due to lattice hampered by dust and oil deposits. To avoid repetitive defects and unwanted condition above, it is necessary to perform major maintenance overhaul every 5000-6000 hours of operation.
Power Authority calls for wise investment in hydropower
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yould, E.P.
Wise investment in hydropower is one of the most valuable long-term economic actions the state of Alaska can take. A review of the hydro projects shows that investigations needed for construction of the Susitna hydroelectric project will be initiated, while Green Lake and Solomon Gulch projects at Sitka and Valdez will enter their second construction season. Swan Lake and Terror Lake hydropower construction for Ketchikan and Kodiak will also be initiated in 1980 followed by Tyee Lake hydropower for Petersburg and Wrangell. Projects still under investigation which may prove feasible for construction in the future are at Cordova, Homer, Seward,more » Bristol Bay, the Tlingit-Haida area, the lower Kuskokwim and Yukon area, and at some smaller rural communities. Other communities may be able to develop wood or peat fueled generation, wile still others might be able to develop small tidal or wind power generation. The Alaska Power Authority is attempting to expedite these projects, and the end result should be a significant degree of electrical energy independence by the end of the next decade.« less
NASA Astrophysics Data System (ADS)
Ceola, Serena; Pugliese, Alessio; Galeati, Giorgio; Castellarin, Attilio
2017-04-01
The anthropogenic alteration of the natural flow regime of a river for hydropower production can significantly modify the processes and functions associated with fluvial ecosystems. In order to preserve the fluvial habitat downstream of dams and diversion structures, environmental flows are commonly defined. Such environmental flows are generally computed from empirical methodologies, which are seldom based on site-specific studies, and may not be representative of local ecological and hydraulic conditions. Here we present the results of a quantitative analysis on the effectiveness of two alternative environmental flow scenarios prescribed in Central Italy (time-invariant experimental and empirically-based flow release versus time-variant hydrogeomorphologically-based flow release) and their impact on hydropower production and fish habitat suitability. The latter is examined by means of several models of habitat suitability curve, which is a well-known approach capable of analysing fluvial species preferences as a function of key eco-hydraulic features, such as water depth, flow velocity and river substrate. The results show an evident loss of hydropower production moving from the time-invariant experimental flow release to the hydrogeomorphological one (nearly 20% at the annual scale). Concerning the effects in terms of fish habitat suitability, our outcomes are less obvious, since they are species- and life stage-specific. The proposed analysis, which can be easily adapted to different riparian habitats and hydrological contexts, is a useful tool to guide the derivation of optimal water resource management strategies in order to ensure both hydropower production and fluvial ecosystem protection.
NASA Astrophysics Data System (ADS)
Castellarin, A.; Galeati, G.; Ceola, S.; Pugliese, A.; Ventura, M.; Montanari, A.
2017-12-01
The anthropogenic alteration of the natural flow regime of a river for hydropower production can significantly modify the processes and functions associated with fluvial ecosystems. In order to preserve the fluvial habitat downstream of dams and diversion structures, environmental flows are commonly defined. Such environmental flows are generally computed from empirical methodologies, which are seldom based on site-specific studies, and may not be representative of local ecological and hydraulic conditions. Here we present the results of a quantitative analysis on the effectiveness of two alternative environmental flow scenarios prescribed in Central Italy (time-invariant experimental and empirically-based flow release versus time-variant hydrogeomorphologically-based flow release) and their impact on hydropower production and fish habitat suitability. The latter is examined by means of several models of habitat suitability curve, which is a well-known approach capable of analysing fluvial species preferences as a function of key eco-hydraulic features, such as water depth, flow velocity and river substrate. The results show an evident loss of hydropower production moving from the time-invariant experimental flow release to the hydrogeomorphological one (nearly 20% at the annual scale). Concerning the effects in terms of fish habitat suitability, our outcomes are less obvious, since they are species- and life stage-specific. The proposed analysis, which can be easily adapted to different riparian habitats and hydrological contexts, is a useful tool to guide the derivation of optimal water resource management strategies in order to ensure both hydropower production and fluvial ecosystem protection.
Stickler, Claudia M; Coe, Michael T; Costa, Marcos H; Nepstad, Daniel C; McGrath, David G; Dias, Livia C P; Rodrigues, Hermann O; Soares-Filho, Britaldo S
2013-06-04
Tropical rainforest regions have large hydropower generation potential that figures prominently in many nations' energy growth strategies. Feasibility studies of hydropower plants typically ignore the effect of future deforestation or assume that deforestation will have a positive effect on river discharge and energy generation resulting from declines in evapotranspiration (ET) associated with forest conversion. Forest loss can also reduce river discharge, however, by inhibiting rainfall. We used land use, hydrological, and climate models to examine the local "direct" effects (through changes in ET within the watershed) and the potential regional "indirect" effects (through changes in rainfall) of deforestation on river discharge and energy generation potential for the Belo Monte energy complex, one of the world's largest hydropower plants that is currently under construction on the Xingu River in the eastern Amazon. In the absence of indirect effects of deforestation, simulated deforestation of 20% and 40% within the Xingu River basin increased discharge by 4-8% and 10-12%, with similar increases in energy generation. When indirect effects were considered, deforestation of the Amazon region inhibited rainfall within the Xingu Basin, counterbalancing declines in ET and decreasing discharge by 6-36%. Under business-as-usual projections of forest loss for 2050 (40%), simulated power generation declined to only 25% of maximum plant output and 60% of the industry's own projections. Like other energy sources, hydropower plants present large social and environmental costs. Their reliability as energy sources, however, must take into account their dependence on forests.
NASA Astrophysics Data System (ADS)
Kern, Jordan D.; Characklis, Gregory W.; Foster, Benjamin T.
2015-04-01
Prolonged periods of low reservoir inflows (droughts) significantly reduce a hydropower producer's ability to generate both electricity and revenues. Given the capital intensive nature of the electric power industry, this can impact hydropower producers' ability to pay down outstanding debt, leading to credit rating downgrades, higher interests rates on new debt, and ultimately, greater infrastructure costs. One potential tool for reducing the financial exposure of hydropower producers to drought is hydrologic index insurance, in particular, contracts structured to payout when streamflows drop below a specified level. An ongoing challenge in developing this type of insurance, however, is minimizing contracts' "basis risk," that is, the degree to which contract payouts deviate in timing and/or amount from actual damages experienced by policyholders. In this paper, we show that consideration of year-to-year changes in the value of hydropower (i.e., the cost of replacing it with an alternative energy source during droughts) is critical to reducing contract basis risk. In particular, we find that volatility in the price of natural gas, a key driver of peak electricity prices, can significantly degrade the performance of index insurance unless contracts are designed to explicitly consider natural gas prices when determining payouts. Results show that a combined index whose value is derived from both seasonal streamflows and the spot price of natural gas yields contracts that exhibit both lower basis risk and greater effectiveness in terms of reducing financial exposure.
NASA Astrophysics Data System (ADS)
Meyer, Eliot S.; Characklis, Gregory W.; Brown, Casey
2017-03-01
Hydropower on the Great Lakes makes up a substantial fraction of regional electricity generation capacity. Hydropower producers on the Niagara River (flowing between lakes Erie and Ontario) operate as run-of-river, and changing lake levels alter interlake flows reducing both generation and revenues. Index-based insurance contracts, wherein contract payouts are linked to lake levels, offer a tool for mitigating this risk. As a potentially useful tool, pricing of financial insurance is typically based on historical behavior of the index. However, uncertainty with respect to the impacts of climate change on lake level behavior and how this might translate to increased (or decreased) risk for those selling or buying the insurance remains unexplored. Portfolios of binary index-insurance contracts are developed for hydropower producers on the Niagara River, and their performance is evaluated under a range of climate scenarios. Climate Informed Decision Analysis is used to inform the sensitivity of these portfolios to potential shifts in long-term, climatological variations in water level behavior. Under historical conditions, hydropower producers can use portfolios costing 0.5% of mean revenues to increase their minimum revenue threshold by approximately 18%. However, a one standard deviation decrease in the 50 year mean water level potentially doubles the frequency with which these portfolios would underperform from the perspective of a potential insurer. Trade-offs between portfolio cost and the frequency of underperformance are investigated over a range of climate futures.
Development of Sustainability Assessment Framework in Hydropower sector
NASA Astrophysics Data System (ADS)
Soliha Sahimi, Nur; Turan, Faiz Mohd; Johan, Kartina
2017-08-01
Nowadays, Malaysian demand in energy sector was drastically increase due to technological developments. Since, hydropower is one of potential renewable energy source in Malaysia. The largest electricity utility company, Tenaga Nasional Berhad was provide an electricity to more than seven million people via independent suppliers in peninsular Malaysia and Sabah by intended a potential sustainable hydropower system. In order to increasingly the power capacity from current use, 1882 MW to more than 3000 MW by years 2020. In this study, the environmental issues and also the penalty to the responsible company especially on Tenaga Nasional Berhad (TNB) towards their project or business are one of the problems. Other than that, every project or business has to prepare a sustainability statement or sustainability report as vital to Bursa Malaysia Securities Berhad under their listing requirements. Next, the sustainability performance on their project cannot be determined to achieve the key performance indicators (KPI) satisfaction from Government, stakeholder or any responsible agencies. This study presents an exhaustive review of these studies and suggests a direction for future developments. Sustainability Assessment framework or self-assessment is decidedly as a significant framework to assist towards sustainability reporting and to produce a Sustainability index for Hydropower sector using a mathematical model study. The results reveal that, the quantitative measurement from Sustainability Assessment framework to Systematic Sustainability Asssesment tool can be produce. In doing so, it is possible to improve the performance of the project especially in hydropower planner.
Hydropower impacts on reservoir fish populations are modified by environmental variation.
Eloranta, Antti P; Finstad, Anders G; Helland, Ingeborg P; Ugedal, Ola; Power, Michael
2018-03-15
Global transition towards renewable energy production has increased the demand for new and more flexible hydropower operations. Before management and stakeholders can make informed choices on potential mitigations, it is essential to understand how the hydropower reservoir ecosystems respond to water level regulation (WLR) impacts that are likely modified by the reservoirs' abiotic and biotic characteristics. Yet, most reservoir studies have been case-specific, which hampers large-scale planning, evaluation and mitigation actions across various reservoir ecosystems. Here, we investigated how the effect of the magnitude, frequency and duration of WLR on fish populations varies along environmental gradients. We used biomass, density, size, condition and maturation of brown trout (Salmo trutta L.) in Norwegian hydropower reservoirs as a measure of ecosystem response, and tested for interacting effects of WLR and lake morphometry, climatic conditions and fish community structure. Our results showed that environmental drivers modified the responses of brown trout populations to different WLR patterns. Specifically, brown trout biomass and density increased with WLR magnitude particularly in large and complex-shaped reservoirs, but the positive relationships were only evident in reservoirs with no other fish species. Moreover, increasing WLR frequency was associated with increased brown trout density but decreased condition of individuals within the populations. WLR duration had no significant impacts on brown trout, and the mean weight and maturation length of brown trout showed no significant response to any WLR metrics. Our study demonstrates that local environmental characteristics and the biotic community strongly modify the hydropower-induced WLR impacts on reservoir fishes and ecosystems, and that there are no one-size-fits-all solutions to mitigate environmental impacts. This knowledge is vital for sustainable planning, management and mitigation of hydropower operations that need to meet the increasing worldwide demand for both renewable energy and ecosystem services delivered by freshwaters. Copyright © 2017 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Allam, M.; Eltahir, E. A. B.
2017-12-01
Rapid population growth, hunger problems, increasing energy demands, persistent conflicts between the Nile basin riparian countries and the potential impacts of climate change highlight the urgent need for the conscious stewardship of the upper Blue Nile (UBN) basin resources. This study develops a framework for the optimal allocation of land and water resources to agriculture and hydropower production in the UBN basin. The framework consists of three optimization models that aim to: (a) provide accurate estimates of the basin water budget, (b) allocate land and water resources optimally to agriculture, and (c) allocate water to agriculture and hydropower production, and investigate trade-offs between them. First, a data assimilation procedure for data-scarce basins is proposed to deal with data limitations and produce estimates of the hydrologic components that are consistent with the principles of mass and energy conservation. Second, the most representative topography and soil properties datasets are objectively identified and used to delineate the agricultural potential in the basin. The agricultural potential is incorporated into a land-water allocation model that maximizes the net economic benefits from rain-fed agriculture while allowing for enhancing the soils from one suitability class to another to increase agricultural productivity in return for an investment in soil inputs. The optimal agricultural expansion is expected to reduce the basin flow by 7.6 cubic kilometres, impacting downstream countries. The optimization framework is expanded to include hydropower production. This study finds that allocating water to grow rain-fed teff in the basin is more profitable than allocating water for hydropower production. Optimal operation rules for the Grand Ethiopian Renaissance dam (GERD) are identified to maximize annual hydropower generation while achieving a relatively uniform monthly production rate. Trade-offs between agricultural expansion and hydropower generation are analysed in an attempt to define cooperation scenarios that would achieve win-win outcomes for all riparian countries.
NASA Astrophysics Data System (ADS)
Anghileri, D.; Castelletti, A.; Burlando, P.
2015-12-01
The recent spreading of renewable energy across Europe and the associated production variability and uncertainty are emerging challenges for hydropower system operation. Widely distributed and highly intermittent solar and wind power generation systems, along with feed-in-tariffs, at which they are remunerated, are threating the operation of traditional hydropower systems. For instance, in countries where the transition to a larger production by means of renewable power systems is a novel process, e.g. Switzerland, many hydropower companies are operating their reservoirs with low or no profits, claiming for a revision of the entire energy market system. This situation goes along with the problem of ensuring energy supply both nowadays and in the future, with changing energy demand and available water resources. In this work, we focus on a hydropower system in the Swiss Alps to explore how different operating policies can cope with both adequate energy supply and profitable operation under current and future climate and socio-economic conditions. We investigate the operation of the Mattmark reservoir in South-West Switzerland. Mattmark is a pumped reservoir of 98 106 m3 fed by a natural catchment of 37 km2 and contributing catchments, summing up to 51 km2, connected by several diversion channels. The hydrological regime, snow- and ice-melt dominated, has already experienced changes in the last decades due to glacier retreat and is expected to be strongly impacted by climate change in the future. We use Multi-Objective optimization techniques to explore current tradeoffs between profitability and secure supply. We then investigate how tradeoffs may evolve in time under different climate change projections and energy market scenarios. Results inform on the co-evolution of climate- and socio-economic induced variations, thus unveiling potential co-benefit situations to hydropower generation and providing insights to future energy market design.
Al-Aqeeli, Yousif H; Lee, T S; Abd Aziz, S
2016-01-01
Achievement of the optimal hydropower generation from operation of water reservoirs, is a complex problems. The purpose of this study was to formulate and improve an approach of a genetic algorithm optimization model (GAOM) in order to increase the maximization of annual hydropower generation for a single reservoir. For this purpose, two simulation algorithms were drafted and applied independently in that GAOM during 20 scenarios (years) for operation of Mosul reservoir, northern Iraq. The first algorithm was based on the traditional simulation of reservoir operation, whilst the second algorithm (Salg) enhanced the GAOM by changing the population values of GA through a new simulation process of reservoir operation. The performances of these two algorithms were evaluated through the comparison of their optimal values of annual hydropower generation during the 20 scenarios of operating. The GAOM achieved an increase in hydropower generation in 17 scenarios using these two algorithms, with the Salg being superior in all scenarios. All of these were done prior adding the evaporation (Ev) and precipitation (Pr) to the water balance equation. Next, the GAOM using the Salg was applied by taking into consideration the volumes of these two parameters. In this case, the optimal values obtained from the GAOM were compared, firstly with their counterpart that found using the same algorithm without taking into consideration of Ev and Pr, secondly with the observed values. The first comparison showed that the optimal values obtained in this case decreased in all scenarios, whilst maintaining the good results compared with the observed in the second comparison. The results proved the effectiveness of the Salg in increasing the hydropower generation through the enhanced approach of the GAOM. In addition, the results indicated to the importance of taking into account the Ev and Pr in the modelling of reservoirs operation.
Majone, Bruno; Villa, Francesca; Deidda, Roberto; Bellin, Alberto
2016-02-01
Climate change is expected to cause alterations of streamflow regimes in the Alpine region, with possible relevant consequences for several socio-economic sectors including hydropower production. The impact of climate change on water resources and hydropower production is evaluated with reference to the Noce catchment, which is located in the Southeastern Alps, Italy. Projected changes of precipitation and temperature, derived from an ensemble of 4 climate model (CM) runs for the period 2040-2070 under the SRES A1B emission scenario, have been downscaled and bias corrected before using them as climatic forcing in a hydrological model. Projections indicate an increase of the mean temperature of the catchment in the range 2-4K, depending on the climate model used. Projections of precipitation indicate an increase of annual precipitation in the range between 2% and 6% with larger changes in winter and autumn. Hydrological simulations show an increase of water yield during the period 2040-2070 with respect to 1970-2000. Furthermore, a transition from glacio-nival to nival regime is projected for the catchment. Hydrological regime is expected to change as a consequence of less winter precipitation falling as snow and anticipated melting in spring, with the runoff peak decreasing in intensity and anticipating from July to June. Changes in water availability reflect in the Technical Hydropower Potential (THP) of the catchment, with larger changes projected for the hydropower plants located at the highest altitudes. Finally, the impacts on THP of water use policies such as the introduction of prescriptions for minimum ecological flow (MEF) have been analyzed. Simulations indicate that in the lower part of the catchment reduction of the hydropower production due to MEF releases from the storage reservoirs counterbalances the benefits associated to the projected increases of inflows as foreseen by simulations driven only by climate change. Copyright © 2015 Elsevier B.V. All rights reserved.
Modelling white-water rafting suitability in a hydropower regulated Alpine River.
Carolli, Mauro; Zolezzi, Guido; Geneletti, Davide; Siviglia, Annunziato; Carolli, Fabiano; Cainelli, Oscar
2017-02-01
Cultural and recreational river ecosystem services and their relations with the flow regime are still poorly investigated. We develop a modelling-based approach to assess recreational flow requirements and the spatially distributed river suitability for white-water rafting, a typical service offered by mountain streams, with potential conflicts of interest with hydropower regulation. The approach is based on the principles of habitat suitability modelling using water depth as the main attribute, with preference curves defined through interviews with local rafting guides. The methodology allows to compute streamflow thresholds for conditions of suitability and optimality of a river reach in relation to rafting. Rafting suitability response to past, present and future flow management scenarios can be predicted on the basis of a hydrological model, which is incorporated in the methodology and is able to account for anthropic effects. Rafting suitability is expressed through a novel metric, the "Rafting hydro-suitability index" (RHSI) which quantifies the cumulative duration of suitable and optimal conditions for rafting. The approach is applied on the Noce River (NE Italy), an Alpine River regulated by hydropower production and affected by hydropeaking, which influences suitability at a sub-daily scale. A dedicated algorithm is developed within the hydrological model to resemble hydropeaking conditions with daily flow data. In the Noce River, peak flows associated with hydropeaking support rafting activities in late summer, highlighting the dual nature of hydropeaking in regulated rivers. Rafting suitability is slightly reduced under present, hydropower-regulated flow conditions compared to an idealized flow regime characterised by no water abstractions. Localized water abstractions for small, run-of-the-river hydropower plants are predicted to negatively affect rafting suitability. The proposed methodology can be extended to support decision making for flow management in hydropower regulated streams, as it has the potential to quantify the response of different ecosystem services to flow regulation. Copyright © 2016 Elsevier B.V. All rights reserved.
Vulnerability of Hidropower Generation in Amazon's Tributaries Under Global Change Scenarios
NASA Astrophysics Data System (ADS)
Von Randow, R.; Siqueira, J. L., Jr.; Rodriguez, D. A.; Tomasella, J.; Floriano, L. E.
2014-12-01
The Brazilian energy sector is under continued expansion. The majority of energy power generation in the country is done through hydropower, which represents around 88% of the energy originated from renewable sources in the country. Still, only 10% of the high potential for production of the Amazon basin is currently availed, and this raises attention for the implantation of new hydropower plants in the region. When a hydropower plant is considered to be built, the natural characteristics of the region are taken into account, considering that the rainfall regime follows certain stationarity. However, under the possibility of global change, the expected capacity of the plants may be compromised. The objective of this study is to evaluate if the current hydropower plants of some Amazon River tributaries can maintain their functionality under global environmental change conditions. For that, based on the discharge data and hydropower information available by Brazilian National Agency of Water and Energy we will infer the energy potential of these hydropower dams for the historic period that will be compared with the energy potential for future discharge under global environmental change conditions. The future discharge will be generated by the Distributed Hydrological Model developed at the Brazilian National Institute for Space Research (MHD-INPE), driven by different climate change scenarios projected by regional and global atmospheric models, associated with land use scenarios projected by a dynamic land use model (LUCC-ME/INPE). MHD-INPE will be calibrated through observed discharges for 1970-1990 using current land use conditions, and will generate discharges for the period of 2000 to 2050. In addition, special attention will be given to the presence of secondary forest growth in the land use scenarios in order to identify the importance of considering this use in the modelling exercise, since that use is not usually considered in hydrological modelling studies.
Nässelqvist, Mattias; Gustavsson, Rolf; Aidanpää, Jan-Olov
2013-07-01
It is important to monitor the radial loads in hydropower units in order to protect the machine from harmful radial loads. Existing recommendations in the standards regarding the radial movements of the shaft and bearing housing in hydropower units, ISO-7919-5 (International Organization for Standardization, 2005, "ISO 7919-5: Mechanical Vibration-Evaluation of Machine Vibration by Measurements on Rotating Shafts-Part 5: Machine Sets in Hydraulic Power Generating and Pumping Plants," Geneva, Switzerland) and ISO-10816-5 (International Organization for Standardization, 2000, "ISO 10816-5: Mechanical Vibration-Evaluation of Machine Vibration by Measurements on Non-Rotating Parts-Part 5: Machine Sets in Hydraulic Power Generating and Pumping Plants," Geneva, Switzerland), have alarm levels based on statistical data and do not consider the mechanical properties of the machine. The synchronous speed of the unit determines the maximum recommended shaft displacement and housing acceleration, according to these standards. This paper presents a methodology for the alarm and trip levels based on the design criteria of the hydropower unit and the measured radial loads in the machine during operation. When a hydropower unit is designed, one of its design criteria is to withstand certain loads spectra without the occurrence of fatigue in the mechanical components. These calculated limits for fatigue are used to set limits for the maximum radial loads allowed in the machine before it shuts down in order to protect itself from damage due to high radial loads. Radial loads in hydropower units are caused by unbalance, shape deviations, dynamic flow properties in the turbine, etc. Standards exist for balancing and manufacturers (and power plant owners) have recommendations for maximum allowed shape deviations in generators. These standards and recommendations determine which loads, at a maximum, should be allowed before an alarm is sent that the machine needs maintenance. The radial bearing load can be determined using load cells, bearing properties multiplied by shaft displacement, or bearing bracket stiffness multiplied by housing compression or movement. Different load measurement methods should be used depending on the design of the machine and accuracy demands in the load measurement. The methodology presented in the paper is applied to a 40 MW hydropower unit; suggestions are presented for the alarm and trip levels for the machine based on the mechanical properties and radial loads.
NASA Astrophysics Data System (ADS)
Tilg, Anna-Maria; Schöber, Johannes; Huttenlau, Matthias; Messner, Jakob; Achleitner, Stefan
2017-04-01
Hydropower is a renewable energy source which can help to stabilize fluctuations in the volatile energy market. Especially pumped-storage infrastructures in the European Alps play an important role within the European energy grid system. Today, the runoff of rivers in the Alps is often influenced by cascades of hydropower infrastructures where the operational procedures are triggered by energy market demands, water deliveries and flood control aspects rather than by hydro-meteorological variables. An example for such a highly hydropower regulated river is the catchment of the river Inn in the Eastern European Alps, originating in the Engadin (Switzerland). A new hydropower plant is going to be built as transboundary project at the boarder of Switzerland and Austria using the water of the Inn River. For the operation, a runoff forecast to the plant is required. The challenge in this case is that a high proportion of runoff is turbine water from an upstream situated hydropower cascade. The newly developed physically based hydrological forecasting system is mainly capable to cover natural hydrological runoff processes caused by storms and snow melt but can model only a small degree of human impact. These discontinuous parts of the runoff downstream of the pumped storage are described by means of an additional statistical model which has been developed. The main goal of the statistical model is to forecast the turbine water up to five days in advance. The lead time of the data driven model exceeds the lead time of the used energy production forecast. Additionally, the amount of turbine water is linked to the need of electricity production and the electricity price. It has been shown that especially the parameters day-ahead prognosis of the energy production and turbine inflow of the previous week are good predictors and are therefore used as input parameters for the model. As the data is restricted due to technical conditions, so-called Tobit models have been used to develop a linear regression for the runoff forecast. Although the day-ahead prognosis cannot always be kept, the regression model delivers, especially during office hours, very reasonable results. In the remaining hours the error between measurement and the forecast increases. Overall, the inflow forecast can be substantially improved by the implementation of the developed regression in the hydrological modelling system.
Dynamic versus static allocation policies in multipurpose multireservoir systems
NASA Astrophysics Data System (ADS)
Tilmant, A.; Goor, Q.; Pinte, D.; van der Zaag, P.
2007-12-01
As the competition for water is likely to increase in the near future due to socioeconomic development and population growth, water resources managers will face hard choices when allocating water between competing users. Because water is a vital resource used in multiple sectors, including the environment, the allocation is inherently a political and social process, which is likely to become increasingly scrutinized as the competition grows between the different sectors. Since markets are usually absent or ineffective, the allocation of water between competing demands is achieved administratively taking into account key objectives such as economic efficiency, equity and maintaining the ecological integrity. When crop irrigation is involved, water is usually allocated by a system of annual rights to use a fixed, static, volume of water. In a fully-allocated basin, moving from a static to a dynamic allocation process, whereby the policies are regularly updated according to the hydrologic status of the river basin, is the first step towards the development of river basin management strategies that increase the productivity of water. More specifically, in a multipurpose multireservoir system, continuously adjusting release and withdrawal decisions based on the latest hydrologic information will increase the benefits derived from the system. However, the extent to which such an adjustment can be achieved results from complex spatial and temporal interactions between the physical characteristics of the water resources system (storage, natural flows), the economic and social consequences of rationing and the impacts on natural ecosystems. The complexity of the decision-making process, which requires the continuous evaluation of numerous trade-offs, calls for the use of integrated hydrologic-economic models. This paper compares static and dynamic management approaches for a cascade of hydropower-irrigation reservoirs using stochastic dual dynamic programming (SDDP) formulations. As its name indicates, SDDP is an extension of SDP that removes the curse of dimensionality found in discrete SDP and can therefore be used to analyze large-scale water resources systems. For the static approach, the multiobjective (irrigation-hydropower) optimization problem is solved using the constraint method, i.e. net benefits from hydropower generation are maximized and irrigation water withdrawals are additional constraints. In the dynamic approach, the SDDP model seeks to maximize the net benefits of both hydropower and irrigation crop production. A cascade of 8 reservoirs in the Turkish and Syrian parts of the Euphrates river basin is used as a case study.
Estimated cumulative sediment trapping in future hydropower reservoirs in Africa
NASA Astrophysics Data System (ADS)
Lucía, Ana; Berlekamp, Jürgen; Zarfl, Christiane
2017-04-01
Despite a rapid economic development in Sub-Saharan Africa, almost 70% of the human population in this area remain disconnected from electricity access (International Energy Agency 2011). Mitigating climate change and a search for renewable, "climate neutral" electricity resources are additional reasons why Africa will be one key centre for future hydropower dam building, with only 8% of the technically feasible hydropower potential actually exploited. About 300 major hydropower dams with a total capacity of 140 GW are currently under construction (11.4%) or planned (88.6%) (Zarfl et al. 2015). Despite the benefits of hydropower dams, fragmentation of the rivers changes the natural flow, temperature and sediment regime. This has consequences for a high number of people that directly depend on the primary sector linked to rivers and floodplains. But sediment trapping in the reservoir also affects dam operation and decreases its life span. Thus, the objective of this work is to quantify the dimension of sediment trapping by future hydropower dams in African river basins. Soil erosion is described with the universal soil loss equation (Wischmeier & Smith 1978) and combined with the connectivity index (Cavalli et al. 2013) to estimate the amount of eroded soil that reaches the fluvial network and finally ends up in the existing (Lehner et al. 2011) and future reservoirs (Zarfl et al. 2015) per year. Different scenarios assuming parameter values from the literature are developed to include model uncertainty. Estimations for existing dams will be compared with literature data to evaluate the applied estimation method and scenario assumptions. Based on estimations for the reservoir volume of the future dams we calculated the potential time-laps of the future reservoirs due to soil erosion and depending on their planned location. This approach could support sustainable decision making for the location of future hydropower dams. References Cavalli, M., Trevisani, S., Comiti, F., & Marchi, L. (2013). Geomorphometric assessment of spatial sediment connectivity in small Alpine catchments. Geomorphology, 188, 31-41. Lehner, B., Liermann, C. R., Revenga, C., Vörösmarty, C., Fekete, B., Crouzet, P., Döll, P., Endejan, M., Frenken, K., Magome, J., Nilsson, C., Robertson, J.C., Rödel, R., Sindorf , N., & Wisser, D. (2011). High-resolution mapping of the world's reservoirs and dams for sustainable river-flow management. Frontiers in Ecology and the Environment, 9(9), 494-502. Wischmeier, W. H. and D. D. Smith. (1978). Predicting rainfall erosion losses: guide to conservation planning. USDA, Agriculture Handbook 537. U.S. Government Printing Office, Washington, DC. Zarfl, C., Lumsdon, A. E., Berlekamp, J., Tydecks, L., & Tockner, K. (2015). A global boom in hydropower dam construction. Aquatic Sciences, 77(1), 161-170.
Relations between information, time, and value of water
NASA Astrophysics Data System (ADS)
Weijs, S. V.; Galindo, L. C.
2015-12-01
This research uses with stochastic dynamic programming (SDP) as a tool to reveal economic information about managed water resources. An application to the operation of an example hydropower reservoir is presented. SDP explicitly balances the marginal value of water for immediate use and its expected opportunity cost of not having more water available for future use. The result of an SDP analysis is a steady state policy, which gives the optimal decision as a function of the state. A commonly applied form gives the optimal release as a function of the month, current reservoir level and current inflow to the reservoir. The steady state policy can be complemented with a real-time management strategy, that can depend on more real-time information. An information-theoretical perspective is given on how this information influences the value of water, and how to deal with that influence in hydropower reservoir optimization. This results in some conjectures about how the information gain from real-time operation could affect the optimal long term policy. Another issue is the sharing of increased benefits that result from this information gain in a multi-objective setting. It is argued that this should be accounted for in negotiations about an operation policy.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13637-001] Great River... No.: P-13637-001. c. Date filed: July 12, 2010. d. Applicant: Great River Hydropower, LLC. e. Name of..., recommendations, terms and conditions, or prescriptions. All filings must (1) bear in all capital letters the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-24
... Interior (1094-0001), by telefax at (202) 395-5806 or via email to [email protected] . Also, please... information covered by 1094-0001. Under FPA section 33, the Secretary of the Department involved must accept... 45; 50 CFR Part 221; the Alternatives Process in Hydropower Licensing. OMB Control Number: 1094-0001...
Water Power Research | Water Power | NREL
Water Power Research Water Power Research NREL conducts water power research; develops design tools Columbia River, Washington. Hydropower Research Hydropower technologies convert the energy of water moving ; and evaluates, validates, and supports the demonstration of innovative water power technologies. Photo
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
..., Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff... information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnline... number field to access the document. For assistance, contact FERC Online Support. You may also register...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-21
...--Criteria for Qualifying Conduit Hydropower Facility Satisfies (Y/ Statutory provision Description N) FPA 30(a)(3)(A), as amended by The conduit the Y HREA. facility uses is a tunnel, canal, pipeline, aqueduct... agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. FPA 30...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-18
... The facility is Y HREA. constructed, operated, or maintained for the generation of electric power and... Conduit Hydropower Facility Satisfies Statutory provision Description (Y/N) FPA 30(a)(3)(A), as amended by The conduit the facility Y HREA. uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-09
...), as amended by HREA.... The facility is constructed, operated, or maintained Y for the generation of... Conduit Hydropower Facility Satisfies Statutory provision Description (Y/N) FPA 30(a)(3)(A), as amended by HREA....... The conduit the facility uses is a tunnel, canal, Y pipeline, aqueduct, flume, ditch, or...
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2013 CFR
2013-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2014 CFR
2014-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2012 CFR
2012-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an... study the feasibility of the Kachess Dam Hydroelectric Project (project) to be located at Kachess Reservoir dam, owned and operated by the U.S. Bureau of Reclamation near Cle Elum and Roslyn in Kittitas...
Batista, I C; Gomes, G J C; Teles, C S; Oliveira, P F; Santos, R M; Sassi, A C; Sá, B; V, B; Pardauil, A A
2012-01-01
This paper aims to present an ergonomic device to assist in the maintenance of the units of Tucuruí Hydropower Plant. The development of this ergonomic device made possible to reduce maintenance time, reduce losses caused by billing, improve performance and reduce the physical strain for labors during the execution of services.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-27
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518-012] Erie Boulevard Hydropower L.P.; Notice of Dispute Resolution Panel Meeting and Technical Conference On September 16, 2011, Commission staff, in response to the filing of notice of study dispute by the New York State Department of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-16
... at non-powered dams and closed-loop pumped storage projects in compliance with section 6 of the... process for licensing hydropower development at non-powered dams and closed-loop pumped storage projects...-powered dam versus closed- loop pumped storage) affect the steps included in a two-year process? 3.9...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-21
..., Ltd., Dan River, Inc., and City of Danville, VA; Notice of Application for Partial Transfer of License... Bankruptcy Trustee for Dan River, Inc. and STS Hydropower, Ltd (co-licensees) transferors and the City of... Schoolfield Hydroelectric Project, FERC No. 2411, located on the Dan River in Pittsylvania County, Virginia...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
...: Northern Illinois Hydropower, LLC. e. Name of Project: Dresden Island Project. f. Location: U.S. Army Corps of Engineers' Dresden Island Lock and Dam on the Illinois River, in the Town of Morris, Grundy County... Description: The Dresden Island Project would utilize the Corps of Engineers' existing Dresden Island Lock and...
New seismic array solution for earthquake observations and hydropower plant health monitoring
NASA Astrophysics Data System (ADS)
Antonovskaya, Galina N.; Kapustian, Natalya K.; Moshkunov, Alexander I.; Danilov, Alexey V.; Moshkunov, Konstantin A.
2017-09-01
We present the novel fusion of seismic safety monitoring data of the hydropower plant in Chirkey (Caucasus Mountains, Russia). This includes new hardware solutions and observation methods, along with technical limitations for three types of applications: (a) seismic monitoring of the Chirkey reservoir area, (b) structure monitoring of the dam, and (c) monitoring of turbine vibrations. Previous observations and data processing for health monitoring do not include complex data analysis, while the new system is more rational and less expensive. The key new feature of the new system is remote monitoring of turbine vibration. A comparison of the data obtained at the test facilities and by hydropower plant inspection with remote sensors enables early detection of hazardous hydrodynamic phenomena.
NASA Astrophysics Data System (ADS)
Kaplan, D. A.; Livino, A.; Arias, M. E.; Crouch, T. D.; Anderson, E.; Marques, E.; Dutka-Gianelli, J.
2017-12-01
The Amazon River watershed is the world's largest river basin and provides US$30 billion/yr in ecosystem services to local populations, national societies, and humanity at large. The Amazon is also a relatively untapped source of hydroelectricity for Latin America, and construction of >30 large hydroelectric dams and >170 small dams is currently underway. Hydropower development will have a cascade of physical, ecological, and social effects at local to global scales. While Brazil has well-defined environmental impact assessment and mitigation programs, these efforts often fail to integrate data and knowledge across disciplines, sectors, and societies throughout the dam planning process. Resulting failures of science, policy, and management have had widespread environmental, economic, and social consequences, highlighting the need for an improved theoretical and practical framework for understanding the impacts of Amazon dams and guiding improved management that respects the needs and knowledge of diverse set of stakeholders. We present a conceptual framework that links four central goals: 1) connecting research in different disciplines (interdisciplinarity); 2) incorporating new knowledge into decision making (adaptive management); 3) including perspectives and participation of non-academic participants in knowledge generation (transdisciplinarity); and 4) extending the idea of environmental flows ("how much water does a river need?") to better consider human uses and users through the concept of fluvial anthropology ("how much water does a society need?"). We use this framework to identify opportunities for improved integration strategies within the (Brazilian) hydroelectric power plant planning and implementation "lifecycle." We applied this approach to the contentious Belo Monte dam, where compliance with regulatory requirements, including monitoring for environmental flows, exemplifies the opportunity for applying adaptive management, but also highlights an urgent need for much improved communication with and participation of affected communities.
NASA Astrophysics Data System (ADS)
Pasten Zapata, Ernesto; Moggridge, Helen; Jones, Julie; Widmann, Martin
2017-04-01
Run-of-the-River (ROR) hydropower schemes are expected to be importantly affected by climate change as they rely in the availability of river flow to generate energy. As temperature and precipitation are expected to vary in the future, the hydrological cycle will also undergo changes. Therefore, climate models based on complex physical atmospheric interactions have been developed to simulate future climate scenarios considering the atmosphere's greenhouse gas concentrations. These scenarios are classified according to the Representative Concentration Pathways (RCP) that are generated according to the concentration of greenhouse gases. This study evaluates possible scenarios for selected ROR hydropower schemes within the UK, considering three different RCPs: 2.6, 4.5 and 8.5 W/m2 for 2100 relative to pre-industrial values. The study sites cover different climate, land cover, topographic and hydropower scheme characteristics representative of the UK's heterogeneity. Precipitation and temperature outputs from state-of-the-art Regional Climate Models (RCMs) from the Euro-CORDEX project are used as input for a HEC-HMS hydrological model to simulate the future river flow available. Both uncorrected and bias-corrected RCM simulations are analyzed. The results of this project provide an insight of the possible effects of climate change towards the generation of power from the ROR hydropower schemes according to the different RCP scenarios and contrasts the results obtained from uncorrected and bias-corrected RCMs. This analysis can aid on the adaptation to climate change as well as the planning of future ROR schemes in the region.
Watkin, Laura Jane; Kemp, Paul S; Williams, Ian D; Harwood, Ian A
2012-06-01
The growing importance of the environment and its management has simultaneously emphasized the benefits of hydroelectric power and its environmental costs. In a changing policy climate, giving importance to renewable energy development and environmental protection, conflict potential between stakeholders is considerable. Navigation of conflict determines the scheme constructed, making sustainable hydropower a function of human choice. To meet the needs of practitioners, greater understanding of stakeholder conflict is needed. This paper presents an approach to illustrate the challenges that face small-scale hydropower development as perceived by the stakeholders involved, and how they influence decision-making. Using Gordleton Mill, Hampshire (UK), as an illustrative case, soft systems methodology, a systems modeling approach, was adopted. Through individual interviews, a range of problems were identified and conceptually modeled. Stakeholder bias towards favoring economic appraisal over intangible social and environmental aspects was identified; costs appeared more influential than profit. Conceptual evaluation of the requirements to meet a stakeholder-approved solution suggested a complex linear systems approach, considerably different from the real-life situation. The stakeholders introduced bias to problem definition by transferring self-perceived issues onto the project owner. Application of soft systems methodology caused a shift in project goals away from further investigation towards consideration of project suitability. The challenge of sustainable hydropower is global, with a need to balance environmental, economic, and social concerns. It is clear that in this type of conflict, an individual can significantly influence outcomes; highlighting the need for more structured approaches to deal with stakeholder conflicts in sustainable hydropower development.
NASA Astrophysics Data System (ADS)
Shaw, Amelia R.; Smith Sawyer, Heather; LeBoeuf, Eugene J.; McDonald, Mark P.; Hadjerioua, Boualem
2017-11-01
Hydropower operations optimization subject to environmental constraints is limited by challenges associated with dimensionality and spatial and temporal resolution. The need for high-fidelity hydrodynamic and water quality models within optimization schemes is driven by improved computational capabilities, increased requirements to meet specific points of compliance with greater resolution, and the need to optimize operations of not just single reservoirs but systems of reservoirs. This study describes an important advancement for computing hourly power generation schemes for a hydropower reservoir using high-fidelity models, surrogate modeling techniques, and optimization methods. The predictive power of the high-fidelity hydrodynamic and water quality model CE-QUAL-W2 is successfully emulated by an artificial neural network, then integrated into a genetic algorithm optimization approach to maximize hydropower generation subject to constraints on dam operations and water quality. This methodology is applied to a multipurpose reservoir near Nashville, Tennessee, USA. The model successfully reproduced high-fidelity reservoir information while enabling 6.8% and 6.6% increases in hydropower production value relative to actual operations for dissolved oxygen (DO) limits of 5 and 6 mg/L, respectively, while witnessing an expected decrease in power generation at more restrictive DO constraints. Exploration of simultaneous temperature and DO constraints revealed capability to address multiple water quality constraints at specified locations. The reduced computational requirements of the new modeling approach demonstrated an ability to provide decision support for reservoir operations scheduling while maintaining high-fidelity hydrodynamic and water quality information as part of the optimization decision support routines.
Shaw, Amelia R.; Sawyer, Heather Smith; LeBoeuf, Eugene J.; ...
2017-10-24
Hydropower operations optimization subject to environmental constraints is limited by challenges associated with dimensionality and spatial and temporal resolution. The need for high-fidelity hydrodynamic and water quality models within optimization schemes is driven by improved computational capabilities, increased requirements to meet specific points of compliance with greater resolution, and the need to optimize operations of not just single reservoirs but systems of reservoirs. This study describes an important advancement for computing hourly power generation schemes for a hydropower reservoir using high-fidelity models, surrogate modeling techniques, and optimization methods. The predictive power of the high-fidelity hydrodynamic and water quality model CE-QUAL-W2more » is successfully emulated by an artificial neural network, then integrated into a genetic algorithm optimization approach to maximize hydropower generation subject to constraints on dam operations and water quality. This methodology is applied to a multipurpose reservoir near Nashville, Tennessee, USA. The model successfully reproduced high-fidelity reservoir information while enabling 6.8% and 6.6% increases in hydropower production value relative to actual operations for dissolved oxygen (DO) limits of 5 and 6 mg/L, respectively, while witnessing an expected decrease in power generation at more restrictive DO constraints. Exploration of simultaneous temperature and DO constraints revealed capability to address multiple water quality constraints at specified locations. Here, the reduced computational requirements of the new modeling approach demonstrated an ability to provide decision support for reservoir operations scheduling while maintaining high-fidelity hydrodynamic and water quality information as part of the optimization decision support routines.« less
Stickler, Claudia M.; Coe, Michael T.; Costa, Marcos H.; Nepstad, Daniel C.; McGrath, David G.; Dias, Livia C. P.; Rodrigues, Hermann O.; Soares-Filho, Britaldo S.
2013-01-01
Tropical rainforest regions have large hydropower generation potential that figures prominently in many nations’ energy growth strategies. Feasibility studies of hydropower plants typically ignore the effect of future deforestation or assume that deforestation will have a positive effect on river discharge and energy generation resulting from declines in evapotranspiration (ET) associated with forest conversion. Forest loss can also reduce river discharge, however, by inhibiting rainfall. We used land use, hydrological, and climate models to examine the local “direct” effects (through changes in ET within the watershed) and the potential regional “indirect” effects (through changes in rainfall) of deforestation on river discharge and energy generation potential for the Belo Monte energy complex, one of the world’s largest hydropower plants that is currently under construction on the Xingu River in the eastern Amazon. In the absence of indirect effects of deforestation, simulated deforestation of 20% and 40% within the Xingu River basin increased discharge by 4–8% and 10–12%, with similar increases in energy generation. When indirect effects were considered, deforestation of the Amazon region inhibited rainfall within the Xingu Basin, counterbalancing declines in ET and decreasing discharge by 6–36%. Under business-as-usual projections of forest loss for 2050 (40%), simulated power generation declined to only 25% of maximum plant output and 60% of the industry’s own projections. Like other energy sources, hydropower plants present large social and environmental costs. Their reliability as energy sources, however, must take into account their dependence on forests. PMID:23671098
NASA Astrophysics Data System (ADS)
Watkin, Laura Jane; Kemp, Paul S.; Williams, Ian D.; Harwood, Ian A.
2012-06-01
The growing importance of the environment and its management has simultaneously emphasized the benefits of hydroelectric power and its environmental costs. In a changing policy climate, giving importance to renewable energy development and environmental protection, conflict potential between stakeholders is considerable. Navigation of conflict determines the scheme constructed, making sustainable hydropower a function of human choice. To meet the needs of practitioners, greater understanding of stakeholder conflict is needed. This paper presents an approach to illustrate the challenges that face small-scale hydropower development as perceived by the stakeholders involved, and how they influence decision-making. Using Gordleton Mill, Hampshire (UK), as an illustrative case, soft systems methodology, a systems modeling approach, was adopted. Through individual interviews, a range of problems were identified and conceptually modeled. Stakeholder bias towards favoring economic appraisal over intangible social and environmental aspects was identified; costs appeared more influential than profit. Conceptual evaluation of the requirements to meet a stakeholder-approved solution suggested a complex linear systems approach, considerably different from the real-life situation. The stakeholders introduced bias to problem definition by transferring self-perceived issues onto the project owner. Application of soft systems methodology caused a shift in project goals away from further investigation towards consideration of project suitability. The challenge of sustainable hydropower is global, with a need to balance environmental, economic, and social concerns. It is clear that in this type of conflict, an individual can significantly influence outcomes; highlighting the need for more structured approaches to deal with stakeholder conflicts in sustainable hydropower development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shaw, Amelia R.; Sawyer, Heather Smith; LeBoeuf, Eugene J.
Hydropower operations optimization subject to environmental constraints is limited by challenges associated with dimensionality and spatial and temporal resolution. The need for high-fidelity hydrodynamic and water quality models within optimization schemes is driven by improved computational capabilities, increased requirements to meet specific points of compliance with greater resolution, and the need to optimize operations of not just single reservoirs but systems of reservoirs. This study describes an important advancement for computing hourly power generation schemes for a hydropower reservoir using high-fidelity models, surrogate modeling techniques, and optimization methods. The predictive power of the high-fidelity hydrodynamic and water quality model CE-QUAL-W2more » is successfully emulated by an artificial neural network, then integrated into a genetic algorithm optimization approach to maximize hydropower generation subject to constraints on dam operations and water quality. This methodology is applied to a multipurpose reservoir near Nashville, Tennessee, USA. The model successfully reproduced high-fidelity reservoir information while enabling 6.8% and 6.6% increases in hydropower production value relative to actual operations for dissolved oxygen (DO) limits of 5 and 6 mg/L, respectively, while witnessing an expected decrease in power generation at more restrictive DO constraints. Exploration of simultaneous temperature and DO constraints revealed capability to address multiple water quality constraints at specified locations. Here, the reduced computational requirements of the new modeling approach demonstrated an ability to provide decision support for reservoir operations scheduling while maintaining high-fidelity hydrodynamic and water quality information as part of the optimization decision support routines.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-17
... Creek; (7) a new approximately 0.6-mile long road from the powerhouse to the dock/ landing site; (8) a new dock/landing site for boat, seaplane, and/or helicopter access, located on the east shore of... Hydropower, Inc.; Notice of Scoping Meeting and Site Visit and Soliciting Scoping Comments for an Applicant...
Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crew, James F.; Johnson, Herbie N.
2015-03-31
From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
... this project can be viewed or printed on the eLibrary link of Commission's Web site at http://www.ferc...) and the instructions on the Commission's Web site under http://www.ferc.gov/docs-filing/efiling.asp... system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact...
Hydropower's Biogenic Carbon Footprint
Pfister, Stephan
2016-01-01
Global warming is accelerating and the world urgently needs a shift to clean and renewable energy. Hydropower is currently the largest renewable source of electricity, but its contribution to climate change mitigation is not yet fully understood. Hydroelectric reservoirs are a source of biogenic greenhouse gases and in individual cases can reach the same emission rates as thermal power plants. Little is known about the severity of their emissions at the global scale. Here we show that the carbon footprint of hydropower is far higher than previously assumed, with a global average of 173 kg CO2 and 2.95 kg CH4 emitted per MWh of electricity produced. This results in a combined average carbon footprint of 273 kg CO2e/MWh when using the global warming potential over a time horizon of 100 years (GWP100). Nonetheless, this is still below that of fossil energy sources without the use of carbon capture and sequestration technologies. We identified the dams most promising for capturing methane for use as alternative energy source. The spread among the ~1500 hydropower plants analysed in this study is large and highlights the importance of case-by-case examinations. PMID:27626943
Enhancing water quality in hydropower system operations
NASA Astrophysics Data System (ADS)
Hayes, Donald F.; Labadie, John W.; Sanders, Thomas G.; Brown, Jackson K.
1998-03-01
The quality of impounded waters often degrades over time because of thermal stratification, sediment oxygen demands, and accumulation of pollutants. Consequently, reservoir releases impact water quality in tailwaters, channels, and other downstream water bodies. Low dissolved oxygen (DO) concentrations in the Cumberland River below Old Hickory dam result from stratification of upstream reservoirs and seasonally low release rates. Operational changes in upstream hydropower reservoirs may be one method to increase DO levels without substantially impacting existing project purposes. A water quality model of the upper Cumberland basin is integrated into an optimal control algorithm to evaluate water quality improvement opportunities through operational modifications. The integrated water quantity/quality model maximizes hydropower revenues, subject to various flow and headwater operational restrictions for satisfying multiple project purposes, as well as maintenance of water quality targets. Optimal daily reservoir release policies are determined for the summer drawdown period which increase DO concentrations under stratification conditions with minimal impact on hydropower production and other project purposes. Appendixes A-D available with entire article on microfiche. Order by mail from AGU, 2000 Florida Ave., N.W., Washington, DC 20009 or by phone at 800-966-2481; $2.50. Document W97-003. Payment must accompany order.
The role of energy systems on hydropower in Turkey
NASA Astrophysics Data System (ADS)
Yuksel, Ibrahim; Arman, Hasan; Halil Demirel, Ibrahim
2017-11-01
Over the last two decades, global electricity production has more than doubled and electricity demand is rising rapidly around the world as economic development spreads to emerging economies. Not only has electricity demand increased significantly, it is the fastest growing end-use of energy. Therefore, technical, economic and environmental benefits of hydroelectric power make it an important contributor to the future world energy mix, particularly in the developing countries. On the other hand, the hydropower industry is closely linked to both water management and renewable energy production, and so has a unique role to play in contributing to sustainable development in a world where billions of people lack access to safe drinking water and adequate energy supplies. In addition to, approximately 1.6 billion people have no access to electricity and about 1.1 billion are without adequate water supply. However, resources for hydropower development are widely spread around the world. Potential exists in about 150 countries, and about 70% of the economically feasible potential remains to be developed-mostly in developing countries where the needs are most urgent. This paper deals with renewable energy systems and the role of hydropower in Turkey.
NASA Astrophysics Data System (ADS)
Wörman, A.; Bottacin-Busolin, A.; Zmijewski, N.; Riml, J.
2017-08-01
Climate-driven fluctuations in the runoff and potential energy of surface water are generally large in comparison to the capacity of hydropower regulation, particularly when hydropower is used to balance the electricity production from covarying renewable energy sources such as wind power. To define the bounds of reservoir storage capacity, we introduce a dedicated reservoir volume that aggregates the storage capacity of several reservoirs to handle runoff from specific watersheds. We show how the storage bounds can be related to a spectrum of the climate-driven modes of variability in water availability and to the covariation between water and wind availability. A regional case study of the entire hydropower system in Sweden indicates that the longest regulation period possible to consider spans from a few days of individual subwatersheds up to several years, with an average limit of a couple of months. Watershed damping of the runoff substantially increases the longest considered regulation period and capacity. The high covariance found between the potential energy of the surface water and wind energy significantly reduces the longest considered regulation period when hydropower is used to balance the fluctuating wind power.
NASA Astrophysics Data System (ADS)
Bergant, A.; Gregorc, B.; Gale, J.
2012-11-01
This paper deals with critical flow regimes that may induce unacceptable water hammer in Kaplan turbine hydropower plants. Water hammer analysis should be performed for normal, emergency and catastrophic operating conditions. Hydropower plants with Kaplan turbines are usually comprised of relatively short inlet and outlet conduits. The rigid water hammer theory can be used for this case. For hydropower plants with long penstocks the elastic water hammer should be used. Some Kaplan turbine units are installed in systems with long open channels. In this case, water level oscillations in the channels should be carefully investigated. Computational results are compared with results of measurements in recently rehabilitated seven Drava river hydroelectric power plants in Slovenia. Water hammer in the six power plants is controlled by appropriate adjustment of the wicket gates and runner blades closing/opening manoeuvres. Due to very long inflow and outflow open channels in Zlatoličje HPP a special vaned pressure regulating device attenuates extreme pressures in Kaplan turbine flow-passage system and controls unsteady flow in both open channels. Comparisons of results include normal operating regimes. The agreement between computed and measured results is reasonable.
Spokane Tribal Hatchery, 2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peone, Tim L.
2003-03-01
The Spokane Tribal Hatchery (Galbraith Springs) project originated from the Northwest Power Planning Council (NPPC) 1987 Columbia Basin Fish and Wildlife Program. The goal of this project is to aid in the restoration and enhancement of the Lake Roosevelt and Banks Lake fisheries adversely affected by the construction and operation of Grand Coulee Dam. The objective is to produce kokanee salmon and rainbow trout for release into Lake Roosevelt for maintaining a viable fishery. The goal and objective of this project adheres to the NPPC Resident Fish Substitution Policy and specifically to the biological objectives addressed in the NPPC Columbiamore » River Basin Fish and Wildlife Program to mitigate for hydropower related fish losses in the blocked area above Chief Joseph/Grand Coulee Dams.« less
Providing security for automated process control systems at hydropower engineering facilities
NASA Astrophysics Data System (ADS)
Vasiliev, Y. S.; Zegzhda, P. D.; Zegzhda, D. P.
2016-12-01
This article suggests the concept of a cyberphysical system to manage computer security of automated process control systems at hydropower engineering facilities. According to the authors, this system consists of a set of information processing tools and computer-controlled physical devices. Examples of cyber attacks on power engineering facilities are provided, and a strategy of improving cybersecurity of hydropower engineering systems is suggested. The architecture of the multilevel protection of the automated process control system (APCS) of power engineering facilities is given, including security systems, control systems, access control, encryption, secure virtual private network of subsystems for monitoring and analysis of security events. The distinctive aspect of the approach is consideration of interrelations and cyber threats, arising when SCADA is integrated with the unified enterprise information system.
NASA Astrophysics Data System (ADS)
Zhao, Weihua; Li, Qingyun; Guo, Weijie; Wang, Zhenhua
2017-05-01
This study take Nahan River as a case to research the impacts of small hydropower stations on macroinvertebrates community. Results showed that a total of 13 macroinvertebrate samples was collected and contained 56 taxa belonging to 18 families and 35 genera. The influence of runoff regulation was more seriously than hydrological period. There were obvious zoning phenomenon of macroinvertebrates between reservoir, downdam reaches and natural reaches. From reservoir, downdam reaches to natural reaches, species abundance increased in turn. There are the least species in reservoir, the most in natural rivers. The reservoirs had the highest biomass and were quite different from those in downdam and natural reaches. However, there was no significant difference between different periods of hydropower station.
Can re-regulation reservoirs and batteries cost-effectively mitigate sub-daily hydropeaking?
NASA Astrophysics Data System (ADS)
Haas, J.; Nowak, W.; Anindito, Y.; Olivares, M. A.
2017-12-01
To compensate for mismatches between generation and load, hydropower plants frequently operate in strong hydropeaking schemes, which is harmful to the downstream ecosystem. Furthermore, new power market structures and variable renewable systems may exacerbate this behavior. Ecological constraints (minimum flows, maximum ramps) are frequently used to mitigate hydropeaking, but these stand in direct tradeoff with the operational flexibility required for integrating renewable technologies. Fortunately, there are also physical methods (i.e. re-regulation reservoirs and batteries) but to date, there are no studies about their cost-effectiveness for hydropeaking mitigation. This study aims to fill that gap. For this, we formulate an hourly mixed-integer linear optimization model to plan the weekly operation of a hydro-thermal-renewable power system from southern Chile. The opportunity cost of water (needed for this weekly scheduling) is obtained from a mid-term programming solved with dynamic programming. We compare the current (unconstrained) hydropower operation with an ecologically constrained operation. The resulting cost increase is then contrasted with the annual payments necessary for the physical hydropeaking mitigation options. For highly constrained operations, both re-regulation reservoirs and batteries show to be economically attractive for hydropeaking mitigation. For intermediate constrained scenarios, re-regulation reservoirs are still economic, whereas batteries can be a viable solution only if they become cheaper in future. Given current cost projections, their break-even point (for hydropeaking mitigation) is expected within the next ten years. Finally, less stringent hydropeaking constraints do not justify physical mitigation measures, as the necessary flexibility can be provided by other power plants of the system.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-14
..., LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineers' (Corps) W. Kerr Scott dam on the Yadkin River, near...(r). h. Applicant Contacts: Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 27027; Mr. Dean Edwards, P.O...
Advanced Pumped Storage Hydropower and Ancillary Services Provision
DOE Office of Scientific and Technical Information (OSTI.GOV)
Muljadi, Eduard; Gevorgian, Vahan; Mohanpurkar, Manish
This paper presents a high-level overview of the capability of advanced pumped storage hydropower to provide ancillary services including frequency regulation and oscillation damping. Type 3 and Type 4 generators are discussed. The examples given are for a small power system that uses a diesel generator as the main generator and a very large system that uses a gas turbine as the main generator.
Analysis of synchronous and induction generators used at hydroelectric power plant
NASA Astrophysics Data System (ADS)
Diniş, C. M.; Popa, G. N.; lagăr, A.
2017-01-01
In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.
Analysis of Hydropower Potential Utilization of Watercourses in Slovakia
NASA Astrophysics Data System (ADS)
Gejguš, Mirko; Aschbacher, Christine; Sablik, Jozef
2017-09-01
This article analyzes the hydropower potential of watercourses in Slovakia, defining water as the most promising and most used renewable energy source. The hydro-energetic potential as a source of energy is determined by the calculation of the technically feasible potential of the watercourses, which is divided into exploited and unused. It also identifies the potential of utilizing the unused technical hydro-energetic potential.
NASA Astrophysics Data System (ADS)
Cassagnole, Manon; Ramos, Maria-Helena; Thirel, Guillaume; Gailhard, Joël; Garçon, Rémy
2017-04-01
The improvement of a forecasting system and the evaluation of the quality of its forecasts are recurrent steps in operational practice. However, the evaluation of forecast value or forecast usefulness for better decision-making is, to our knowledge, less frequent, even if it might be essential in many sectors such as hydropower and flood warning. In the hydropower sector, forecast value can be quantified by the economic gain obtained with the optimization of operations or reservoir management rules. Several hydropower operational systems use medium-range forecasts (up to 7-10 days ahead) and energy price predictions to optimize hydropower production. Hence, the operation of hydropower systems, including the management of water in reservoirs, is impacted by weather, climate and hydrologic variability as well as extreme events. In order to assess how the quality of hydrometeorological forecasts impact operations, it is essential to first understand if and how operations and management rules are sensitive to input predictions of different quality. This study investigates how 7-day ahead deterministic and ensemble streamflow forecasts of different quality might impact the economic gains of energy production. It is based on a research model developed by Irstea and EDF to investigate issues relevant to the links between quality and value of forecasts in the optimisation of energy production at the short range. Based on streamflow forecasts and pre-defined management constraints, the model defines the best hours (i.e., the hours with high energy prices) to produce electricity. To highlight the link between forecasts quality and their economic value, we built several synthetic ensemble forecasts based on observed streamflow time series. These inputs are generated in a controlled environment in order to obtain forecasts of different quality in terms of accuracy and reliability. These forecasts are used to assess the sensitivity of the decision model to forecast quality. Relationships between forecast quality and economic value are discussed. This work is part of the IMPREX project, a research project supported by the European Commission under the Horizon 2020 Framework programme, with grant No. 641811 (http://www.imprex.eu)
NASA Astrophysics Data System (ADS)
Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.
2016-12-01
We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.
The future of hydropower planning modeling
NASA Astrophysics Data System (ADS)
Haas, J.; Zuñiga, D.; Nowak, W.; Olivares, M. A.; Castelletti, A.; Thilmant, A.
2017-12-01
Planning the investment and operation of hydropower plants with optimization tools dates back to the 1970s. The focus used to be solely on the provision of energy. However, advances in computational capacity and solving algorithms, dynamic markets, expansion of renewable sources, and a better understanding of hydropower environmental impacts have recently led to the development of novel planning approaches. In this work, we provide a review, systematization, and trend analysis of these approaches. Further, through interviews with experts, we outline the future of hydropower planning modeling and identify the gaps towards it. We classified the found models along environmental, economic, multipurpose and technical criteria. Environmental interactions include hydropeaking mitigation, water quality protection and limiting greenhouse gas emissions from reservoirs. Economic and regulatory criteria consider uncertainties of fossil fuel prices and relicensing of water rights and power purchase agreements. Multipurpose considerations account for irrigation, tourism, flood protection and drinking water. Recently included technical details account for sedimentation in reservoirs and variable efficiencies of turbines. Additional operational considerations relate to hydrological aspects such as dynamic reservoir inflows, water losses, and climate change. Although many of the above criteria have been addressed in detail on a project-to-project basis, models remain overly simplistic for planning large power fleets. Future hydropower planning tools are expected to improve the representation of the water-energy nexus, including environmental and multipurpose criteria. Further, they will concentrate on identifying new sources of operational flexibility (e.g. through installing additional turbines and pumps) for integrating renewable energy. The operational detail will increase, potentially emphasizing variable efficiencies, storage capacity losses due to sedimentation, and the timing of inflows (which are becoming more variable under climate change). Finally, the relicensing of existing operations and planning new installations are subject to deep uncertainties that need to be captured.
Interactions Between Land Use, Climate and Hydropower in Scotland
NASA Astrophysics Data System (ADS)
Sample, J.
2014-12-01
To promote the transition towards a low carbon economy, the Scottish Government has adopted ambitious energy targets, including generating all electricity from renewable sources by 2020. To achieve this, continued investment will be required across a range of sustainable technologies. Hydropower has a long history in Scotland and the present-day operational capacity of ~1.5 GW makes a substantial contribution to the national energy budget. In addition, there remains potential for ~500 MW of further development, mostly in the form of small to medium size run-of-river schemes. Climate change is expected to lead to an intensification of the global hydrological cycle, leading to changes in both the magnitude and seasonality of river flows. There may also be indirect effects, such as changing land use, enhanced evapotranspiration rates and an increased demand for irrigation, all of which could affect the water available for energy generation. Preliminary assessments of hydropower commonly use flow duration curves (FDCs) to estimate the power generation potential at proposed new sites. In this study, we use spatially distributed modelling to generate daily and monthly FDCs for a range of Scottish catchments using a variety of future land use and climate change scenarios. These are then used to assess Scotland's future hydropower potential under different flow regimes. The results are spatially variable and include large uncertainties, but some consistent patterns emerge. Many locations are predicted to experience enhanced seasonality, with lower power generation potential in the summer months and greater potential during the autumn and winter. Some sites may require infrastructural changes in order to continue operating at optimum efficiency. We discuss the implications and limitations of our results, and highlight design and adaptation options for maximising the resilience of hydropower installations under changing future flow patterns.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamay, Ryan A.; Troia, Matthew J.; DeRolph, Christopher R.
Stream classifications are an inventory of different types of streams. Classifications help us explore similarities and differences among different types of streams, make inferences regarding stream ecosystem behavior, and communicate the complexities of ecosystems. We developed a nested, layered, and spatially contiguous stream classification to characterize the biophysical settings of stream reaches within the Eastern United States (~ 900,000 reaches). The classification is composed of five natural characteristics (hydrology, temperature, size, confinement, and substrate) along with several disturbance regime layers, and each was selected because of their relevance to hydropower mitigation. We developed the classification at the stream reach levelmore » using the National Hydrography Dataset Plus Version 1 (1:100k scale). The stream classification is useful to environmental mitigation for hydropower dams in multiple ways. First, it creates efficiency in the regulatory process by creating an objective and data-rich means to address meaningful mitigation actions. Secondly, the SCT addresses data gaps as it quickly provides an inventory of hydrology, temperature, morphology, and ecological communities for the immediate project area, but also surrounding streams. This includes identifying potential reference streams as those that are proximate to the hydropower facility and fall within the same class. These streams can potentially be used to identify ideal environmental conditions or identify desired ecological communities. In doing so, the stream provides some context for how streams may function, respond to dam regulation, and an overview of specific mitigation needs. Herein, we describe the methodology in developing each stream classification layer and provide a tutorial to guide applications of the classification (and associated data) in regulatory settings, such as hydropower (re)licensing.« less
Li, Jin Peng; Dong, Shi Kui; Peng, Ming Chun; Wu, Xuan; Zhou, Fang; Yu, Yin
2017-12-01
Benthic macroinvertebrate assemblages are one of the biological groups in aquatic ecosystem most sensitive to the habitat change and degradation, and can be a biological indicator for the aquatic ecosystem change and succession in cascading hydropower dam reservoir. The middle and lower reaches of the Lancang River are key spot for international biodiversity conservation and ecological studies on the effects of cascading hydropower dam exploitation. In this study, the reservoir of Manwan hydropower dam, the first dam in Lancang-Mekong river main stream, was selected as the study site. The benthic macroinvertebrate assemblages were sampled in 2011 and 2016 respectively. Meanwhile, the survey data before impounding (natural river, 1996) and early stage of single dam (1997) were collected to conduct the overall analysis for structure, distribution pattern and evolution of benthic macroinvertebrate assemblages. The results showed that the dominant biological group was gradually changed from the Oligochaeta and Insecta to the Mollusca. Along the longitudinal gradient, the density and biomass of the benthic macroinvertebrate assemblages were remarkably increased in reservoir, especially in the lacustrine zone. As for the functional feeding group, the predator and gatherer-collector changed into filter-collector predominantly in lacustrine zone. With the cascading dams operation, the biotic index indicated that the water quality of reservoir in 2016 was better than in 2011. The evolution of benthic macroinvertebrate assemblages in the Manwan Reservoir was related to the operation of Xiaowan dam in the upper reach, the hydrological regime and siltation in the reservoir, and would continue with dynamic changes with the operation of the cascading hydropower dam.
[Effects of small hydropower substitute fuel project on forest ecosystem services].
Yu, Hai Yan; Zha, Tong Gang; Nie, Li Shui; Lyu, Zhi Yuan
2016-10-01
Based on the Forest Ecosystem Services Assessment Standards (LY/T 1721-2008) issued by the State Forestry Administration, this paper evaluated four key functions of forest ecosystems, i.e., water conservation, soil conservation, carbon fixation and oxygen release, and nutrient accumulation. Focusing on the project area of Majiang County in Guizhou Province, this study provided some quantitative evidence that the implementation of the small hydropower substituting fuel project had positive effects on the values and material quantities of ecosystem service functions. The results showed that the small hydropower substituting fuel project had a significant effect on the increase of forest ecosystem services. Water conservation quantity of Pinus massoniana and Cupressus funebris plantations inside project area was 20662.04 m 3 ·hm -2 ·a -1 , 20.5% higher than outside project area, with soil conservation quantity of 119.1 t·hm -2 ·a -1 , 29.7% higher than outside project area, carbon fixation and oxygen release of 220.49 t·hm -2 ·a -1 , 40.2% higher than outside project area, and forest tree nutrition accumulation of 3.49 t·hm -2 ·a -1 , 48.5% higher than outside project area. Small hydropower substituting fuel project for increasing the quota of forest ecosystem service function value was in the order of carbon fixation and oxygen release function (71400 yuan·hm -2 ·a -1 ) > water conservation function (60100 yuan·hm -2 ·a -1 ) > tree nutrition accumulation function (13800 yuan·hm -2 ·a -1 ) > soil conservation function (8100 yuan·hm -2 ·a -1 ). Small hydropower substituting fuel project played an important role for improving the forest ecological service function value and realizing the sustainable development of forest.
Wu, Yiping; Chen, Ji
2013-01-01
The ever-increasing demand for water due to growth of population and socioeconomic development in the past several decades has posed a worldwide threat to water supply security and to the environmental health of rivers. This study aims to derive reservoir operating rules through establishing a multi-objective optimization model for the Xinfengjiang (XFJ) reservoir in the East River Basin in southern China to minimize water supply deficit and maximize hydropower generation. Additionally, to enhance the estimation of irrigation water demand from the downstream agricultural area of the XFJ reservoir, a conventional method for calculating crop water demand is improved using hydrological model simulation results. Although the optimal reservoir operating rules are derived for the XFJ reservoir with three priority scenarios (water supply only, hydropower generation only, and equal priority), the river environmental health is set as the basic demand no matter which scenario is adopted. The results show that the new rules derived under the three scenarios can improve the reservoir operation for both water supply and hydropower generation when comparing to the historical performance. Moreover, these alternative reservoir operating policies provide the flexibility for the reservoir authority to choose the most appropriate one. Although changing the current operating rules may influence its hydropower-oriented functions, the new rules can be significant to cope with the increasingly prominent water shortage and degradation in the aquatic environment. Overall, our results and methods (improved estimation of irrigation water demand and formulation of the reservoir optimization model) can be useful for local watershed managers and valuable for other researchers worldwide.
Evaluating existing access opportunities for disabled persons at remote shoreline recreation sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bley, M.R.; Kearns, M.T.
1995-12-31
Draft guidelines for providing outdoor recreation access opportunities for disabled persons have been recommended by the Recreation Access Advisory Committee and in the Universal Access to Outdoor Recreation: A Design Guide. The Federal Energy Regulatory Commission requires applicants for new hydropower licenses to consider access opportunities for disabled persons at existing hydropower projects. A process for evaluating existing access opportunities for disabled persons at remote shoreline recreation sites at hydropower projects is described. The process includes five steps: (1) preparing a preliminary map of existing recreation sites; (2) data collection in the field; (3) evaluating compliance of existing facilities; (4)more » feasibility of enhancing existing facilities; and (5) designing enhancements. The process will be refined when final standards and processes are approved by the appropriate agencies and organizations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam; Chalise, Dol Raj; Hadjerioua, Boualem
The slow pace of Pumped Storage Hydropower development in the US over the past twenty years has led to widespread interest in the feasibility and viability of alternative PSH designs, development schemes, and technologies. Since 2011, Oak Ridge National Lab has been exploring the economic viability of modular Pumped Storage Hydropower (m-PSH) development through targeted case studies, revenue simulations, and analysis of innovative configurations and designs. This paper outlines the development and supporting analysis of a scalable, comprehensive cost modeling tool designed to simulate the initial capital costs for a variety of potential m-PSH projects and deployment scenarios. The toolmore » is used to explore and determine innovative research strategies that can improve the economic viability of m-PSH in US markets.« less
NASA Astrophysics Data System (ADS)
Rougé, Charles; Tilmant, Amaury
2015-04-01
Stochastic dual dynamic programming (SDDP) is an optimization algorithm well-suited for the study of large-scale water resources systems comprising reservoirs - and hydropower plants - as well as irrigation nodes. It generates intertemporal allocation policies that balance the present and future marginal value of water while taking into account hydrological uncertainty. It is scalable, in the sense that the time and memory required for computation do not grow exponentially with the number of state variables. Still, this scalability relies on the sampling of a few relevant trajectories for the system, and the approximation of the future value of water through cuts -i.e., hyperplanes - at points along these trajectories. Therefore, the accuracy of this approximation arguably decreases as the number of state variables increases, and it is important not to have more than necessary. In previous formulations, SDDP had three types of state variables, namely storage in each reservoir, inflow at each node and water accumulated during the irrigation season for each crop at each node. We present a simplified formulation for irrigation that does not require using the latter type of state variable. It also requires only two decision variables for each irrigation site, where the previous formulation had four per crop - and there may be several crops at the same site. This reduction in decision variables effectively reduces computation time, since SDDP decomposes the stochastic, multiperiodic, non-linear maximization problem into a series of linear ones. The proposed formulation, while computationally simpler, is mathematically equivalent to the previous one, and therefore the model gives the same results. A corollary of this formulation is that marginal utility of water at an irrigation site is effectively related to consumption at that site, through a piecewise linear function representing the net benefits from irrigation. Last but not least, the proposed formulation can be extended to any type of consumptive use of water beyond irrigation, e.g., municipal, industrial, etc This slightly different version of SDDP is applied to a large portion of the Tigris-Euphrates river basin. It comprises 24 state variables representing storage in reservoirs, 28 hydrologic state variables, and 51 demand nodes. It is the largest yet to simultaneously consider hydropower and irrigation within the same river system, and the proposed formulation almost halves the number of state variables to be considered.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McLellan, Holly; Lee, Chuck; Scofield, Ben
1999-08-01
The Grand Coulee Dam was constructed in 1939 without a fish ladder, which eliminated steelhead (Onchorhynchus mykiss), chinook salmon (O. twshwastica), coho salmon (O. kisutch) and sockeye salmon (O. nerka) from returning to approximately 1,835 km (1,140 miles) of natal streams and tributaries found in the upper Columbia River Drainage in the United States and Canada. The Pacific Northwest Electric Power Planning and Conservation Act of 1980 gave the Bonneville Power Administration (BPA), the authority and responsibility to use its legal and financial resources, 'to protect, mitigate, and enhance fish and wildlife to the extent affected by the development andmore » operation of any hydroelectric project of the Columbia River and its tributaries. This is to be done in a manner consistent with the program adopted by the Northwest Power Planning Council (NWPPC), and the purposes of the Act' (NWPPC, 1987). With the phrase 'protect, mitigate and enhance', Congress signaled its intent that the NWPPC's fish and wildlife program should do more than avoid future hydroelectric damage to the basin's fish and wildlife. The program must also counter past damage, work toward rebuilding those fish and wildlife populations that have been harmed by the hydropower system, protect the Columbia Basin's fish and wildlife resources, and mitigate for harm caused by decades of hydroelectric development and operations. By law, this program is limited to measures that deal with impacts created by the development, operation and management of hydroelectric facilities on the Columbia River and its tributaries. However, off-site enhancement projects are used to address the effects of the hydropower system on fish and wildlife (NWPPC 1987). Resident game fish populations have been established in Franklin D. Roosevelt Lake, the reservoir behind Grand Coulee Dam, since the extirpation of anadromous fish species. The resident game fish populations are now responsible for attracting a large percentage of the recreational visits to the region. An increase in popularity has placed Lake Roosevelt fifth amongst the most visited State and Federal parks in Washington. Increased use of the reservoir prompted amplified efforts to enhance the Native American subsistence fishery and the resident sport fishery in 1984 with hatchery supplementation of rainbow trout (O. mykiss) and kokanee salmon (O. nerka). This was followed by the formation of the Spokane Tribal Lake Roosevelt Monitoring Project (LRMP) in 1988 and later by formation of the Lake Roosevelt Data Collection Project in 1991. The Lake Roosevelt Data Collection Project began in July 1991 as part of the BPA, Bureau of Reclamation, and U.S. Army Corps of Engineers System Operation Review process. This process sought to develop an operational scenario for the federal Columbia River hydropower system to maximize the in-reservoir fisheries with minimal impacts to all other stakeholders in the management of the Columbia River. The Lake Roosevelt Monitoring/Data Collection Program (LRMP) is the result of a merger between the Lake Roosevelt Monitoring Program (BPA No. 8806300) and the Lake Roosevelt Data Collection Project (BPA No. 9404300). These projects were merged in 1996 forming the Lake Roosevelt Monitoring Program (LRMP), which continues the work historically completed under the separate projects. The LRMP has two main goals. The first is to develop a biological model for Lake Roosevelt that will predict in-reservoir biological responses to a range of water management operational scenarios, and to develop fisheries and reservoir management strategies accordingly. The model will allow identification of lake operations that minimize impacts on lake biota while addressing the needs of other interests (e.g. flood control, hydropower generation, irrigation, and downstream resident and anadromous fisheries). Major components of the model will include: (1) quantification of entrainment and other impacts to phytoplankton, zooplankton and fish caused by reservoir drawdowns and low water retention times; (2) quantification of seasonal distributions, standing crop, and habitat use of fish food organisms; (3) examination of variations in fish growth and abundance in relation to reservoir operations, prey abundance and predator/prey relationships; and (4) quantification of habitat alterations due to hydrooperations. The second goal of the LRMP is to evaluate the impacts of hatchery kokanee salmon and rainbow trout on the ecosystem and to determine stocking strategies that maximize angler harvest and return of adult kokanee salmon to egg collection facilities. Major tasks of the hatchery evaluation portion of the project include conducting a year round reservoir wide creel survey, sampling the fishery during spring, summer and fall via electro-fishing and gillnet surveys, and collecting information on diet, growth, and age composition of various fish species in Lake Roosevelt.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gorlov, A.M.
This report contains conclusive results of the research project entitled ``Further Development of the Pneumatic Method to Harness Hydropower and its Experimental Implementation in the State of Maine`` sponsored by the US Department of Energy (Contract DE-FG02-91ER12113). The results obtained by this research are considerably beyond the original goals anticipated by the contract which were a theoretical study of the method only and its possible applications. In fact, the success of the analytical research program has allowed us to move on to development, construction and testing of a physical model of the hydro-air power converter and, subsequently, to development ofmore » a well equipped hydro-pneumatic power laboratory at Northeastern University. Photographs la and 2a show both the laboratory and the model. Good performance of the model proves that the hydro-pneumatic concept holds much promise for development of an ecologically safe and commercially attractive novel approach to harnessing ultra low-head hydropower. As a result, private companies have started to support this new technology, and to invest money in its further development and construction of demonstration power plants (Appendix 1). Visitors at the Northeastern University laboratory often praise this new technique, as is attested by the articles in the Wall Street Journal (Appendix 2) and the Technology Review (Appendix 3).« less
Renewable energy projects in the Dominican Republic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Viani, B.
1997-12-01
This paper describes a US/Dominican Republic program to develop renewable energy projects in the country. The objective is to demonstrate the commercial viability of renewable energy generation projects, primarily small-scale wind and hydropower. Preliminary studies are completed for three micro-hydro projects with a total capacity of 262 kWe, and two small wind power projects for water pumping. In addition wind resource assessment is ongoing, and professional training and technical assistance to potential investors is ongoing. Projects goals include not less than ten small firms actively involved in installation of such systems by September 1998.
NASA Astrophysics Data System (ADS)
Tøfte, Lena S.; Martino, Sara; Mo, Birger
2016-04-01
This study analyses whether and to which extent today's hydropower system and reservoirs in Mid-Norway are able to balance new intermittent energy sources in the region, in both today's and tomorrow's climate. We also investigate if the electricity marked model EMPS gives us reasonable results also when run in a multi simulation mode without recalibration. Climate related energy (CRE) is influenced by the weather, the system for energy production and transport, and by market mechanisms. In the region of Mid-Norway, nearly all power demand is generated by hydro-electric facilities. Due to energy deficiency and limitations in the power grid the region experiences a deficit of electricity. The region is likely to experience considerable investments in wind power and small-scale hydropower and the transmission grid within and out of the region will probably be extended, so this situation might change. In addition climate change scenarios for the region agree on higher temperatures, more precipitation in total and a larger portion of the precipitation coming as rain instead of snow, as well as we expect slightly higher wind speed and more storms during the winter. Changing temperatures will also change the electricity demand. EMPS is a tool for forecasting and planning in electricity markets, developed for optimization and simulation of hydrothermal power systems with a considerable share of hydro power. It takes into account transport constraints and hydrological differences between major areas or regional subsystems. During optimization the objective is to minimize the expected cost in the whole system subject to all constraints. Incremental water values (marginal costs for hydropower) are computed for each area using stochastic dynamic programming. A heuristic approach is used to treat the interaction between areas. In the simulation part of the model total system costs are minimized week by week for each climate scenario in a linear problem formulation. A detailed representation of hydropower is included and total hydro power production for each area is calculated, and the production is distributed among all available plants within each area. During simulation, the demand is affected by prices and temperatures. 6 different infrastructure scenarios of wind and power line development are analyzed. The analyses are done by running EMPS calibrated for today's situation for 11*11*8 different combinations of altered weather variables (temperature, precipitation and wind) describing different climate change scenarios, finding the climate response function for every EMPS-variable according the electricity production, such as prices and income, energy balances (supply, consumption and trade), overflow losses, probability of curtailment etc .
Revised congressional budget request, FY 1982. Conservation and renewable energy program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-03-01
Programs dealing with conservation and renewable energy are reprinted from the Revised Congressional Budget Request FY 1982. From Volume 7, Energy Conservation, information is presented on: buildings and community systems; industrial programs; transportation programs; state and local programs; inventor's program energy conversion technology; energy impact assistance; and residential/commercial retrofit. From Volume 2, Energy Supply Research and Development, information and data are presented on: solar building applications; solar industrial applications; solar power applications; solar information systems; SERI facility; solar international activities; alcohol fuels; geothermal; and hydropower. From Volume 6, Energy Production, Demonstration, and Distribution, information and data on solar energy production,more » demonstration, and distribution are presented. From Volume 3, Energy Supply and R and D Appropriation, information and data on electric energy systems and energy storage systems are included. From Volume 4, information and data are included on geothermal resources development fund. In Volume 5, Power Marketing Administrations, information and data are presented on estimates by appropriations, positions and staff years by appropriation, staffing distribution, and power marketing administrations. Recissions and deferrals for FY 1981 are given. (MCW)« less
Developing New Modelling Tools for Environmental Flow Assessment in Regulated Salmon Rivers
NASA Astrophysics Data System (ADS)
Geris, Josie; Soulsby, Chris; Tetzlaff, Doerthe
2013-04-01
There is a strong political drive in Scotland to meet all electricity demands from renewable sources by 2020. In Scotland, hydropower generation has a long history and is a key component of this strategy. However, many rivers sustain freshwater communities that have both high conservation status and support economically important Atlantic salmon fisheries. Both new and existing hydropower schemes must be managed in accordance with the European Union's Water Framework Directive (WFD), which requires that all surface water bodies achieve good ecological status or maintain good ecological potential. Unfortunately, long-term river flow monitoring is sparse in the Scottish Highlands and there are limited data for defining environmental flows. The River Tay is the most heavily regulated catchment in the UK. To support hydropower generation, it has an extensive network of inter- and intra- catchment transfers, in addition to a large number of regulating reservoirs for which abstraction legislation often only requires minimum compensation flows. The Tay is also considered as one of Scotland's most important rivers for Atlantic salmon (Salmo salar), and there is considerable uncertainty as to how best change reservoir operations to improve the ecological potential of the river system. It is now usually considered that environmental flows require more than a minimum compensation flow, and instead should cover a range of hydrological flow aspects that represent ecologically relevant streamflow attributes, including magnitude, timing, duration, frequency and rate of change. For salmon, these hydrological indices are of particular interest, with requirements varying at different stages of their life cycle. To meet the WFD requirements, rationally alter current abstraction licences and provide an evidence base for regulating new hydropower schemes, advanced definitions for abstraction limits and ecologically appropriate flow releases are desirable. However, a good understanding of the natural flow variability and the hydrological impacts of the regulation is unavailable, partly because pre-regulation data of existing hydropower schemes are lacking. Here we develop a novel modelling approach for characterising natural flow regimes and defining hydrological flow indices. This allows us to quantitatively assess the impacts of hydropower to better inform environmental flow requirements for the Atlantic salmon river ecosystem. Results are presented for the River Lyon (390 km2), a regulated headwater catchment of the River Tay. The HBV hydrological rainfall-runoff model is used to simulate flows, based on calibrated parameters from regulated flow data, with the current hydropower scheme active. For this, the HBV model is adapted to be able to incorporate water transfers and regulated flows. The natural hydrological indices are derived from the simulated pre-regulation data, and compared with those of the regulated data to investigate the impact of the regulation on these at different critical times for Atlantic salmon. The sensitivity of the system to change is also investigated to explore the extent to which flow variables can be modified without major degradation to the river's ecosystem, while still maintaining viable hydropower generation. The modelling approach presented will provide the basis for assessing impacts on hydrological flow indices and informing environmental flows in regions with similar heavily regulated mountain river ecosystems.
NASA Astrophysics Data System (ADS)
Ferguson, I. M.; McGuire, M.; Broman, D.; Gangopadhyay, S.
2017-12-01
The Bureau of Reclamation is a Federal agency tasked with developing and managing water supply and hydropower projects in the Western U.S. Climate and hydrologic variability and change significantly impact management actions and outcomes across Reclamation's programs and initiatives, including water resource planning and operations, infrastructure design and maintenance, hydropower generation, and ecosystem restoration, among others. Planning, design, and implementation of these programs therefore requires consideration of future climate and hydrologic conditions will impact program objectives. Over the past decade, Reclamation and other Federal agencies have adopted new guidelines, directives, and mandates that require consideration of climate change in water resources planning and decision making. Meanwhile, the scientific community has developed a large number of climate projections, along with an array of models, methods, and tools to facilitate consideration of climate projections in planning and decision making. However, water resources engineers, planners, and decision makers continue to face challenges regarding how best to use the available data and tools to support major decisions, including decisions regarding infrastructure investments and long-term operating criteria. This presentation will discuss recent and ongoing research towards understanding, improving, and expanding consideration of climate projections and related uncertainties in Federal water resources planning and decision making. These research efforts address a variety of challenges, including: How to choose between available climate projection datasets and related methods, models, and tools—many of which are considered experimental or research tools? How to select an appropriate decision framework when design or operating alternatives may differ between climate scenarios? How to effectively communicate results of a climate impacts analysis to decision makers? And, how to improve robustness and resilience of water resources systems in the face of significant uncertainty? Discussion will focus on the intersection between technical challenges and decision making paradigms and the need for improved scientist-decision maker engagement through the lens of this Federal water management agency.
1981-11-01
c . Distribute any energy and capacity which is produced from the hydropower facility. d . Furnish power free of cost to the United States for...and the State of Washington would be the local sponsor of the fish C -35 L NPSEN-PL-HP Honorable John D . Spellman hatchery. The combined project would...sharing poli cy, provi~de a cash contribution equal to 10 percent of the allocated 3 C -
Steady and transient regimes in hydropower plants
NASA Astrophysics Data System (ADS)
Gajic, A.
2013-12-01
Hydropower plant that has been in operation for about 30 years has to be reconstructed. They have already installed 12 Kaplan turbines, the largest in the world at that time. The existing CAM relationship was determined based on hydraulic model tests and checked by efficiency on-site tests. It was also tested based on turbine bearing vibrations. In order to discover vibrations and long cracks on stay vanes detailed on-site measurements were performed. Influence of the modification of the trailing edges on the dynamic stresses of the stay vanes is also shown. In order to improve power output transient regimes were analyzed, both experimentally and numerically. Reversible hydropower plant, a pioneer in Europe since it was the first Pump storage power plant constructed with the highest head pump-turbines in the world. Analyses of transient regimes discover some problems with S-shaped characteristics coupled with non-symmetrical penstock.
Yu, Xiaodong; Zhang, Jian; Zhou, Ling
2014-01-01
Based on the theory of hydraulic transients and the method of characteristics (MOC), a mathematic model of the differential surge tank with pressure-reduction orifices (PROs) and overflow weirs for transient calculation is proposed. The numerical model of hydraulic transients is established using the data of a practical hydropower station; and the probable transients are simulated. The results show that successive load rejection is critical for calculating the maximum pressure in spiral case and the maximum rotating speed of runner when the bifurcated pipe is converging under the surge tank in a diversion-type hydropower station; the pressure difference between two sides of breast wall is large during transient conditions, and it would be more serious when simultaneous load rejections happen after load acceptance; the reasonable arrangement of PROs on breast wall can effectively decrease the pressure difference.
Asynchrony of wind and hydropower resources in Australia.
Gunturu, Udaya Bhaskar; Hallgren, Willow
2017-08-18
Wind and hydropower together constitute nearly 80% of the renewable capacity in Australia and their resources are collocated. We show that wind and hydro generation capacity factors covary negatively at the interannual time scales. Thus, the technology diversity mitigates the variability of renewable power generation at the interannual scales. The asynchrony of wind and hydropower resources is explained by the differential impact of the two modes of the El Ni˜no Southern Oscillation - canonical and Modoki - on the wind and hydro resources. Also, the Modoki El Ni˜no and the Modoki La Ni˜na phases have greater impact. The seasonal impact patterns corroborate these results. As the proportion of wind power increases in Australia's energy mix, this negative covariation has implications for storage capacity of excess wind generation at short time scales and for generation system adequacy at the longer time scales.
Short-Term Planning of Hybrid Power System
NASA Astrophysics Data System (ADS)
Knežević, Goran; Baus, Zoran; Nikolovski, Srete
2016-07-01
In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.
Yu, Xiaodong; Zhang, Jian
2014-01-01
Based on the theory of hydraulic transients and the method of characteristics (MOC), a mathematic model of the differential surge tank with pressure-reduction orifices (PROs) and overflow weirs for transient calculation is proposed. The numerical model of hydraulic transients is established using the data of a practical hydropower station; and the probable transients are simulated. The results show that successive load rejection is critical for calculating the maximum pressure in spiral case and the maximum rotating speed of runner when the bifurcated pipe is converging under the surge tank in a diversion-type hydropower station; the pressure difference between two sides of breast wall is large during transient conditions, and it would be more serious when simultaneous load rejections happen after load acceptance; the reasonable arrangement of PROs on breast wall can effectively decrease the pressure difference. PMID:25133213
NASA Astrophysics Data System (ADS)
Khadka Mishra, S.; Hayse, J.; Veselka, T.; Yan, E.; Kayastha, R. B.; McDonald, K.; Steiner, N.; Lagory, K.
2017-12-01
Climate-mediated changes in melting of snow and glaciers and in precipitation patterns are expected to significantly alter the water flow of rivers at various spatial and temporal scales. Hydropower generation and fisheries are likely to be impacted annually and over the century by the seasonal as well as long-term changes in hydrological conditions. In order to quantify the interactions between the drivers of climate change, the hydropower sector and the ecosystem we developed an integrated assessment framework that links climate models with process-based bio-physical and economic models. This framework was applied to estimate the impacts of changes in snow and glacier melt on the stream flow of the Trishuli River of the High Mountain Asia Region. Remotely-sensed data and derived products, as well as in-situ data, were used to quantify the changes in snow and glacier melt. The hydrological model was calibrated and validated for stream flows at various points in the Trishuli river in order to forecast conditions at the location of a stream gauge station upstream of the Trishuli hydropower plant. The flow of Trishuli River was projected to increase in spring and decrease in summer over the period of 2020-2100 under RCP 8.5 and RCP 4.5 scenarios as compared to respective mean seasonal discharge observed over 1981-2014. The simulated future annual mean stream flow would increase by 0.6 m3/s under RCP 8.5 scenario but slightly decrease under RCP 4.5. The Argonne Hydropower Energy and Economic toolkit was used to estimate and forecast electricity generation at the Trishuli power plant under various flow conditions and upgraded infrastructure. The increased spring flow is expected to increase dry-season electricity generation by 18% under RCP 8.5 in comparison to RCP 4.5. A fishery suitability model developed for the basin indicated that fishery suitability in the Trishuli River would be greater than 70% of optimal, even during dry months under both RCP 4.5 and RCP 8.5. The estimated economic value (preliminary result) of electricity generated from the Trishuli hydropower plant under RCP 4.5 and RCP 8.5 were projected to be 3.7% to 7.5% higher for the month of March while for the months of April and May the values were1.5% to 9.4% lower.
Hydropower potential mapping in mountain basins by high-resolution hydrological and GIS analysis
NASA Astrophysics Data System (ADS)
Claps, P.; Gallo, E.; Ganora, D.; Laio, F.; Masoero, A.
2013-12-01
Even in regions with mature hydropower development, needs for stable renewable power sources suggest to revise plans of exploitation of water resources, in compliance to the framework of international and national environmental regulations. This goal requires high-resolution hydrological analysis, that allows to : i) comply with the effects of existing hydropower plants or of other types of water withdrawals; ii) to assist the planner to figure out potential of new plants with still high marginal efficiency; iii) to assist the regulator in the process of comparing projects based on different solutions and different underlying hydrologic estimation methods. Flow duration curves (FDC) are the tool usually adopted to represent water availability and variability for hydropower purposes. They are usually determined in ungauged basins by means of regional statistical analysis. For this study, a 'spatially smooth' regional estimation method (SSEM) has been developed for FDC estimation, with some evolutions from a previous version: i) the method keeps the estimates of mean annual runoff congruent in the confluences by considering only raster-summable explanatory variables; ii) the presence of existing reservoirs and hydropower plants is taken into account by restoring the ';natural' statistics of the curve. The SSEM reconstructs the the FDC in ungauged basins using its L-moments from regressions on geomorphoclimatic descriptors. Relations are obtained on more than 100 gauged basins located in Northwestern Italy. To support the assessment of residual hydropower potential on two specific mountain watersheds the model has been applied extensively (Hi-Res) by mapping the estimated mean flow for each pixel of a DEM-derived river network raster model. 25000 sections were then identified over the network extracted from a 50m-resolution DTM. Spatial algorithms and data management were developed using Free&OpenSource Software (FOSS) (GRASS GIS and PostgreSQL/PostGIS), with the spatial database required to store perimeters and other descriptors needed for the hydrological estimation. Specific efforts have been devoted to spatial representation of the available potential using different flow-(elevation drop) relations for each pixel (along-river path, straight within floating window, in-valley constrained, etc.). This representation expands the information content and the domain of application of the classical hydrodynamic curve ( elevation-drop/ contributing area). Specific and abrupt changes due to existing plants are then clearly represented to provide a complete picture of the available potential for planning and regulation purposes.
Hydropower into the mainstream: A view from the Potomac
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clarke, D.H.
1992-04-01
This article discusses the regulatory and political environment in Washington, D.C. as it affects the hydro power industry, and the actions of the National Hydropower Association in ensuring that regulators, politicians, and federal agencies understand the issues necessary to maintaining hydro power as a mainstream energy source for the U.S. Some of the issues discussed are the Clean Water Act reauthorization, the Endangered Species Act reauthorization, National Energy Strategy legislation, and trends in FERC regulation.
Effective management of combined renewable energy resources in Tajikistan.
Karimov, Khasan S; Akhmedov, Khakim M; Abid, Muhammad; Petrov, Georgiy N
2013-09-01
Water is needed mostly in summer time for irrigation and in winter time for generation of electric power. This results in conflicts between downstream countries that utilize water mostly for irrigation and those upstream countries, which use water for generation of electric power. At present Uzbekistan is blocking railway connection that is going to Tajikistan to interfere to transportation of the equipment and materials for construction of Rogun hydropower plant. In order to avoid conflicts between Tajikistan and Uzbekistan a number of measures for the utilization of water resources of the trans-boundary Rivers Amu-Darya and Sir-Darya are discussed. In addition, utilization of water with the supplement of wind and solar energy projects for proper and efficient management of water resources in Central Asia; export-import exchanges of electric energy in summer and winter time between neighboring countries; development of small hydropower project, modern irrigation system in main water consuming countries and large water reservoir hydropower projects for control of water resources for hydropower and irrigation are also discussed. It is also concluded that an effective management of water resources can be achieved by signing Water treaty between upstream and downstream countries, first of all between Tajikistan and Uzbekistan. In this paper management of water as renewable energy resource in Tajikistan and Central Asian Republics are presented. Copyright © 2013. Published by Elsevier B.V.
Regional water consumption for hydro and thermal electricity generation in the United States
Lee, Uisung; Han, Jeongwoo; Elgowainy, Amgad; ...
2017-05-18
Water is an essential resource for most electric power generation technologies. Thermal power plants typically require a large amount of cooling water whose evaporation is regarded to be consumed. Hydropower plants result in evaporative water loss from the large surface areas of the storing reservoirs. This paper estimated the regional water consumption factors (WCFs) for thermal and hydro electricity generation in the United States, because the WCFs of these power plants vary by region and water supply and demand balance are of concern in many regions. For hydropower, total WCFs were calculated using a reservoir’s surface area, state-level water evaporation,more » and background evapotranspiration. Then, for a multipurpose reservoir, a fraction of its WCF was allocated to hydropower generation based on the share of the economic valuation of hydroelectricity among benefits from all purposes of the reservoir. For thermal power plants, the variations in WCFs by type of cooling technology, prime mover technology, and by region were addressed. The results show that WCFs for electricity generation vary significantly by region. Finally, the generation-weighted average WCFs of thermoelectricity and hydropower are 1.25 (range of 0.18–2.0) and 16.8 (range of 0.67–1194) L/kWh, respectively, and the generation-weighted average WCF by the U.S. generation mix in 2015 is estimated at 2.18 L/kWh.« less
NASA Astrophysics Data System (ADS)
Salami, Adebayo Wahab; Sule, Bolaji Fatai; Adunkpe, Tope Lacroix; Ayanshola, Ayanniyi Mufutau; Bilewu, Solomon Olakunle
2017-03-01
Optimization models have been developed to maximize annual energy generation from the Doma dam, subject to the constraint of releases for irrigation, ecological purposes, the water supply, the maximum yield from the reservoir and reservoir storage. The model was solved with LINGO software for various mean annual inflow exceedence probabilities. Two scenarios of hydropower retrofitting were considered. Scenario 1, with the reservoir inflows at 50%, 75%, and 90% probabilities of exceedence, gives the total annual hydropower as 0.531 MW, 0.450 MW and 0.291 MW, respectively. The corresponding values for scenario 2 were 0.615 MW, 0.507 MW, and 0.346 MW respectively. The study also considered increasing the reservoir's live storage to 32.63Mm3 by taking part of the flood storage so that the maximum draft increases to 7 Mm3. With this upper limit of storage and draft with reservoir inflows of 50%, 75% and 90% probabilities of exceedence, the hydropower generated increased to 0.609 MW, 0.540 MW, and 0.347 MW respectively for the scenario 1 arrangement, while those of scenario 2 increased to 0.699 MW, 0.579MW and 0.406 MW respectively. The results indicate that the Doma Dam is suitable for the production of hydroelectric power and that its generation potential is between 0.61 MW and 0.70 MW.
Greenhouse Gas Emissions from U.S. Hydropower Reservoirs: FY2011 Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, Arthur J; Mosher, Jennifer J; Mulholland, Patrick J
2012-05-01
The primary objective of this study is to quantify the net emissions of key greenhouse gases (GHG) - notably, CO{sub 2} and CH{sub 4} - from hydropower reservoirs in moist temperate areas within the U.S. The rationale for this objective is straightforward: if net emissions of GHG can be determined, it would be possible to directly compare hydropower to other power-producing methods on a carbon-emissions basis. Studies of GHG emissions from hydropower reservoirs elsewhere suggest that net emissions can be moderately high in tropical areas. In such areas, warm temperatures and relatively high supply rates of labile organic matter canmore » encourage high rates of decomposition, which (depending upon local conditions) can result in elevated releases of CO{sub 2} and CH{sub 4}. CO{sub 2} and CH{sub 4} emissions also tend to be higher for younger reservoirs than for older reservoirs, because vegetation and labile soil organic matter that is inundated when a reservoir is created can continue to decompose for several years (Galy-Lacaux et al. 1997, Barros et al. 2011). Water bodies located in climatically cooler areas, such as in boreal forests, could be expected to have lower net emissions of CO{sub 2} and CH{sub 4} because their organic carbon supplies tend to be relatively recalcitrant to microbial action and because cooler water temperatures are less conducive to decomposition.« less
NASA Astrophysics Data System (ADS)
Gaudard, Ludovic; Madani, Kaveh; Romerio, Franco
2016-04-01
The future of hydropower depends on various drivers, and in particular on climate change, electricity market evolution and innovation in new storage technologies. Their impacts on the power plants' profitability can widely differ in regards of scale, timing, and probability of occurrence. In this respect, the risk should not be expressed only in terms of expected revenue, but also of uncertainty. These two aspects must be considered to assess the future of hydropower. This presentation discusses the impacts of climate change, electricity market volatility and competing energy storage's technologies and quantifies them in terms of annual revenue. Our simulations integrate a glacio-hydrological model (GERM) with various electricity market data and models (mean reversion and jump diffusion). The medium (2020-50) and long-term (2070-2100) are considered thanks to various greenhouse gas scenarios (A1B, A2 and RCP3PD) and the stochastic approach for the electricity prices. An algorithm named "threshold acceptance" is used to optimize the reservoir operations. The impacts' scale, and the related uncertainties are presented for Mauvoisin, which is a storage-hydropower plant situated in the Swiss Alps, and two generic pure pumped-storage installations, which are assessed with the prices of 17 European electricity markets. The discussion will highlight the key differences between the impacts brought about by the drivers.
Regional water consumption for hydro and thermal electricity generation in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Uisung; Han, Jeongwoo; Elgowainy, Amgad
Water is an essential resource for most electric power generation technologies. Thermal power plants typically require a large amount of cooling water whose evaporation is regarded to be consumed. Hydropower plants result in evaporative water loss from the large surface areas of the storing reservoirs. This paper estimated the regional water consumption factors (WCFs) for thermal and hydro electricity generation in the United States, because the WCFs of these power plants vary by region and water supply and demand balance are of concern in many regions. For hydropower, total WCFs were calculated using a reservoir’s surface area, state-level water evaporation,more » and background evapotranspiration. Then, for a multipurpose reservoir, a fraction of its WCF was allocated to hydropower generation based on the share of the economic valuation of hydroelectricity among benefits from all purposes of the reservoir. For thermal power plants, the variations in WCFs by type of cooling technology, prime mover technology, and by region were addressed. The results show that WCFs for electricity generation vary significantly by region. Finally, the generation-weighted average WCFs of thermoelectricity and hydropower are 1.25 (range of 0.18–2.0) and 16.8 (range of 0.67–1194) L/kWh, respectively, and the generation-weighted average WCF by the U.S. generation mix in 2015 is estimated at 2.18 L/kWh.« less
Cumulative effects of cascade hydropower stations on total dissolved gas supersaturation.
Ma, Qian; Li, Ran; Feng, Jingjie; Lu, Jingying; Zhou, Qin
2018-05-01
Elevated levels of total dissolved gas (TDG) may occur downstream of dams during the spill process. These high levels would increase the incidence of gas bubble disease in fish and cause severe environmental impacts. With increasing numbers of cascade hydropower stations being built or planned, the cumulative effects of TDG supersaturation are becoming increasingly prominent. The TDG saturation distribution in the downstream reaches of the Jinsha River was studied to investigate the cumulative effects of TDG supersaturation resulting from the cascade hydropower stations. A comparison of the effects of the joint operation and the single operation of two hydropower stations (XLD and XJB) was performed to analyze the risk degree to fish posed by TDG supersaturation. The results showed that water with supersaturated TDG generated at the upstream cascade can be transported to the downstream power station, leading to cumulative TDG supersaturation effects. Compared with the single operation of XJB, the joint operation of both stations produced a much higher TDG saturation downstream of XJB, especially during the non-flood discharge period. Moreover, the duration of high TDG saturation and the lengths of the lethal and sub-lethal areas were much higher in the joint operation scenario, posing a greater threat to fish and severely damaging the environment. This work provides a scientific basis for strategies to reduce TDG supersaturation to the permissible level and minimize the potential risk of supersaturated TDG.
NASA Astrophysics Data System (ADS)
Kardhana, Hadi; Arya, Doni Khaira; Hadihardaja, Iwan K.; Widyaningtyas, Riawan, Edi; Lubis, Atika
2017-11-01
Small-Scale Hydropower (SHP) had been important electric energy power source in Indonesia. Indonesia is vast countries, consists of more than 17.000 islands. It has large fresh water resource about 3 m of rainfall and 2 m of runoff. Much of its topography is mountainous, remote but abundant with potential energy. Millions of people do not have sufficient access to electricity, some live in the remote places. Recently, SHP development was encouraged for energy supply of the places. Development of global hydrology data provides opportunity to predict distribution of hydropower potential. In this paper, we demonstrate run-of-river type SHP spot prediction tool using SWAT and a river diversion algorithm. The use of Soil and Water Assessment Tool (SWAT) with input of CFSR (Climate Forecast System Re-analysis) of 10 years period had been implemented to predict spatially distributed flow cumulative distribution function (CDF). A simple algorithm to maximize potential head of a location by a river diversion expressing head race and penstock had been applied. Firm flow and power of the SHP were estimated from the CDF and the algorithm. The tool applied to Upper Citarum River Basin and three out of four existing hydropower locations had been well predicted. The result implies that this tool is able to support acceleration of SHP development at earlier phase.
NASA Astrophysics Data System (ADS)
Finger, David
2015-04-01
Since the ninth century when the first settlers arrived in Iceland the island has undergone deforestation and subsequent vegetation degradation and soil erosion. Almost the entire birch forest and woodland, which originally covered ~ 25% of the nation, have been deforested through wood cutting and overgrazing. Consequently, soil erosion seriously affects over 40% of the country. During the last 50 years extensive drainage of wetlands has taken place. Furthermore, about 75% of Iceland electricity production comes from hydropower plants, constructed along the main rivers. Along with seismic and volcanic activities the above mentioned anthropogenic impacts continuously altered the hydro-geomorphic connectivity in many parts of the island. In the framework of ongoing efforts to restore ecosystems and their services in Iceland a thorough understanding of the hydro-geomorphic processes is essential. Field observations and numerical models are crucial tools to adopt appropriate management strategies and help decision makers establish sustainable governance strategies. Sediment transport models have been used in the past to investigate the impacts of hydropower dams on sediment transport in downstream rivers (Finger et al., 2006). Hydropower operations alter the turbidity dynamics in downstream freshwater systems, affecting visibility and light penetration into the water, leading to significant changes in primary production (Finger et al., 2007a). Overall, the interruption of connectivity by physical obstructions can affect the entire food chain, hampering the fishing yields in downstream waters (Finger et al., 2007b). In other locations hydraulic connectivity through retreating glaciers assures water transfer from upstream to downstream areas. The drastically retreat of glaciers can raise concerns of future water availability in remote mountain areas (Finger et al., 2013). Furthermore, the drastic reduction of glacier mass also jeopardizes the water availability for hydropower production (Finger et al., 2012). All these factors reveal the importance of a thorough understanding of hydro-geomorphic connectivity to adopt adequate water management strategies. The presentation will conclude by outlining how the above presented methods can be applied to Icelandic study sites to help water managers and policy makers to adopt resilient based policies regarding the challenges of future climate change impacts. References: Finger, D., M. Schmid, and A. Wuest (2006), Effects of upstream hydropower operation on riverine particle transport and turbidity in downstream lakes, Water Resour. Res., 42(8), doi: 10.1029/2005wr004751. Finger, D., P. Bossard, M. Schmid, L. Jaun, B. Müller, D. Steiner, E. Schaffer, M. Zeh, and A. Wüest (2007a), Effects of alpine hydropower operations on primary production in a downstream lake, Aquatic Sciences, 69(2), 240-256, doi: 10.1007/s00027-007-0873-6. Finger, D., M. Schmid, and A. Wüest (2007b), Comparing effects of oligotrophication and upstream hydropower dams on plankton and productivity in perialpine lakes, Water Resour. Res., 43(12), W12404, doi: 10.1029/2007WR005868. Finger, D., G. Heinrich, A. Gobiet, and A. Bauder (2012), Projections of future water resources and their uncertainty in a glacierized catchment in the Swiss Alps and the subsequent effects on hydropower production during the 21st century, Water Resour. Res., 48, doi: 10.1029/2011wr010733, W02521. Finger, D., A. Hugentobler, M. Huss, A. Voinesco, H. R. Wernli, D. Fischer, E. Weber, P.-Y. Jeannin, M. Kauzlaric, A. Wirz, T. Vennemann, F. Hüsler, B. Schädler, and R. Weingartner (2013), Identification of glacial melt water runoff in a karstic environment and its implication for present and future water availability, Hydrol. Earth Syst. Sci., 17, 3261-3277, doi: 10.5194/hess-17-3261-2013.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, Abe
2014-04-09
The main goal of this proposal was to develop and test a novel powertrain solution for the SLH hydroEngine, a low-cost, efficient low-head hydropower technology. Nearly two-thirds of U.S. renewable electricity is produced by hydropower (EIA 2010). According to the U.S. Department of Energy; this amount could be increased by 50% with small hydropower plants, often using already-existing dams (Hall 2004). There are more than 80,000 existing dams, and of these, less than 4% generate power (Blankinship 2009). In addition, there are over 800 irrigation districts in the U.S., many with multiple, non-power, low-head drops. These existing, non-power dams andmore » irrigation drops could be retrofitted to produce distributed, baseload, renewable energy with appropriate technology. The problem is that most existing dams are low-head, or less than 30 feet in height (Ragon 2009). Only about 2% of the available low-head hydropower resource in the U.S. has been developed, leaving more than 70 GW of annual mean potential low-head capacity untapped (Hall 2004). Natel Energy, Inc. is developing a low-head hydropower turbine that operates efficiently at heads less than 6 meters and is cost-effective for deployment across multiple low-head structures. Because of the unique racetrack-like path taken by the prime-movers in the SLH, a flexible powertrain is required. Historically, the only viable technological solution was roller chain. Despite the having the ability to easily attach blades, roller chain is characterized by significant drawbacks, including high cost, wear, and vibration from chordal action. Advanced carbon- fiber-reinforced timing belts have been recently developed which, coupled with a novel belt attachment system developed by Natel Energy, result in a large reduction in moving parts, reduced mass and cost, and elimination of chordal action for increased fatigue life. The work done in this project affirmatively addressed each of the following 3 major uncertainties concerning a timing-belt based hydroEngine powertrain: 1. Can a belt handle the high torques and power loads demanded by the SLH? (Yes.) 2. Can the SLH blades be mounted to belt with a connection that can withstand the loads encountered in operation? (Yes.) 3. Can the belt, with blade attachments, live through the required cyclic loading? (Yes.) The research adds to the general understanding of sustainable small hydropower systems by using innovative system testing to develop and demonstrate performance of a novel powertrain solution, enabling a new type of hydroelectric turbine to be commercially developed. The technical effectiveness of the methods investigated has been shown to be positive through an extensive design and testing process accommodating many constraints and goals, with a major emphasis on high cycle fatigue life. Economic feasibility of the innovations has been demonstrated through many iterations of design for manufacturability and cost reduction. The project is of benefit to the public because it has helped to develop a solution to a major problem -- despite the large available potential for new low-head hydropower, high capital costs and high levelized cost of electricity (LCOE) continue to be major barriers to project development. The hydroEngine represents a significant innovation, leveraging novel fluid mechanics and mechanical configuration to allow lower-cost turbine manufacture and development of low head hydropower resources.« less
NASA Astrophysics Data System (ADS)
Scherer, L.; Pfister, S.
2015-12-01
Hydropower ranks first among renewable sources of power production and provides globally about 16% of electricity. While it is praised for its low greenhouse gas emissions, it is accused of its large water consumption which surpasses that of all conventional and most renewable energy sources (except for bioenergy) by far. Previous studies mostly applied a gross evaporation approach where all the current evaporation from the plant's reservoir is allocated to hydropower. In contrast, we only considered net evaporation as the difference between current evaporation and actual evapotranspiration before the construction of the reservoir. In addition, we take into account local water stress, its monthly fluctuations and storage effects of the reservoir in order to assess the impacts on water availability for other users. We apply the method to a large dataset of almost 1500 globally distributed hydropower plants (HPPs), covering ~43% of global annual electricity generation, by combining reservoir information from the Global Reservoir and Dam (GRanD) database with information on electricity generation from the CARMA database. While we can confirm that the gross water consumption of hydropower is generally large (production-weighted average of 97 m3/GJ), other users are not necessarily deprived of water. In contrast, they also benefit in many cases from the reservoir because water is rather stored in the wet season and released in the dry season, thereby alleviating water stress. The production-weighted water scarcity footprint of the analyzed HPPs amounts to -41 m3 H2Oe/GJ. It has to be noted that the impacts among individual plants vary a lot. Larger HPPs generally consume less water per unit of electricity generated, but also the benefits related to alleviating water scarcity are lower. Overall, reservoirs promote both, energy and water security. Other environmental impacts such as flow alterations and social impacts should, however, also be considered, as they can be enormous.
The role of glaciers for Swiss hydropower production
NASA Astrophysics Data System (ADS)
Schaefli, Bettina; Manso, Pedro; Fischer, Mauro; Huss, Matthias
2016-04-01
In Switzerland, hydropower represents over 50% of the total annual electricity production. Given the Alpine setting of the country, this hydropower production (HPP) strongly relies on the natural storage of discharge in form of ice and snow over months to decades. The sensitivity of glacier-fed HPP systems with respect to climate change depends on how the today's production and the infrastructure design relies on the seasonal streamflow delay expected from the natural storage effect of snow and ice. For low-head run-of-river HPP plants built on large lowland rivers, the ongoing glacier retreat (resulting in strong summer melt) currently sustains higher flows during summer months, an effect that will certainly be reduced once the glaciers will have reached a critical size. This effect will also modify the inflow to the large storage HPP plants that have been designed to shift large amounts of meltwater inflows from summer to winter. The management of these reservoirs will certainly have to be adapted to future inflow patterns. An interesting case are high-head run-of-river plants (with heads from 100 to 1100 m) that short-circuit a given river reach. Future regime shifts with less sustained summer flow and more concentrated spring melt flows might critically reduce the annual production due to intake overflow during spring and reduced flow during summer. In this work, we discuss the role of glaciers for these different HPP types in detail, including an overview of how glacier retreat might influence their production. This comprehensive study synthesizes up-to-date estimations of glacier mass change since the 1980s and its influence on high Alpine discharge regimes and state-of-the art simulations of potential future glacier discharge regimes. We also attempt an extrapolation to the country level based on a hydropower GIS database that has been developed for economic purposes. Ongoing Swiss research on sediment production and management might complete this picture with the role of glacier sediment delivery for hydropower operation.
NASA Astrophysics Data System (ADS)
Gonzalez Cabrera, J. M., Sr.; Olivares, M. A.
2015-12-01
This study proposes a method to develop efficient operational policies for a reservoir the southern Chile. The main water uses in this system are hydropower and irrigation, with conflicting seasonal demands. The conflict between these two uses is currently managed through a so-called "irrigation agreement" which defines a series of operational conditions on the reservoir by restricting volumes used for power production depending on reservoir storage level. Other than that, the reservoir operation is driven by cost-minimization over the power grid. Recent evidence shows an increasing degree of conflict in this basin, which suggests that the static approach of irrigation agreements, might no longer be appropriate. Moreover, this agreement could be revised in light of decreased water availability. This problem poses a challenge related to the spatial scope of analysis. Thus, irrigation benefits are driven by decisions made within the basin, whereas hydropower benefits depend on the operation of the entire power grid. Exploring the tradeoffs between these two water uses involves modeling both scales. The proposed methodology integrates information from both a grid-wide power operations model and a basin-wide agro-economic model into a decision model for optimal reservoir operation. The first model, a hydrothermal coordination tool, schedules power production by each plant in the grid, and allows capturing technical and economic aspects to the operation of hydropower reservoirs. The agro-economic model incorporates economic features of irrigation in the basin, and allows obtaining irrigation water demand functions. Finally, the results of both models are integrated into a single model for optimal reservoir operation considering the tradeoffs between the two uses. The result of the joint operation of water resources, show a flexible coordination of uses, revealing the opportunity cost of irrigation, which it gives the possibility of negotiating transfers of water to hydropower in dry years, with the aim of obtaining greater benefits from water use in the basin
Characterizing effects of hydropower plants on sub-daily flow regimes
NASA Astrophysics Data System (ADS)
Bejarano, María Dolores; Sordo-Ward, Álvaro; Alonso, Carlos; Nilsson, Christer
2017-07-01
A characterization of short-term changes in river flow is essential for understanding the ecological effects of hydropower plants, which operate by turning the turbines on or off to generate electricity following variations in the market demand (i.e., hydropeaking). The goal of our study was to develop an approach for characterizing the effects of hydropower plant operations on within-day flow regimes across multiple dams and rivers. For this aim we first defined ecologically meaningful metrics that provide a full representation of the flow regime at short time scales from free-flowing rivers and rivers exposed to hydropeaking. We then defined metrics that enable quantification of the deviation of the altered short-term flow regime variables from those of the unaltered state. The approach was successfully tested in two rivers in northern Sweden, one free-flowing and another regulated by cascades of hydropower plants, which were additionally classified based on their impact on short-term flows in sites of similar management. The largest differences between study sites corresponded to metrics describing sub-daily flow magnitudes such as amplitude (i.e., difference between the highest and the lowest hourly flows) and rates (i.e., rise and fall rates of hourly flows). They were closely followed by frequency-related metrics accounting for the numbers of within-day hourly flow patterns (i.e., rises, falls and periods of stability of hourly flows). In comparison, between-site differences for the duration-related metrics were smallest. In general, hydropeaking resulted in higher within-day flow amplitudes and rates and more but shorter periods of a similar hourly flow patterns per day. The impacted flow feature and the characteristics of the impact (i.e., intensity and whether the impact increases or decreases whatever is being described by the metric) varied with season. Our approach is useful for catchment management planning, defining environmental flow targets, prioritizing river restoration or dam reoperation efforts and contributing information for relicensing hydropower dams.
Hydropower versus irrigation—an analysis of global patterns
NASA Astrophysics Data System (ADS)
Zeng, Ruijie; Cai, Ximing; Ringler, Claudia; Zhu, Tingju
2017-03-01
Numerous reservoirs around the world provide multiple flow regulation functions; key among these are hydroelectricity production and water releases for irrigation. These functions contribute to energy and food security at national, regional and global levels. While reservoir operations for hydroelectricity production might support irrigation, there are also well-known cases where hydroelectricity production reduces water availability for irrigated food production. This study assesses these relationships at the global level using machine-learning techniques and multi-source datasets. We find that 54% of global installed hydropower capacity (around 507 thousand Megawatt) competes with irrigation. Regions where such competition exists include the Central United States, northern Europe, India, Central Asia and Oceania. On the other hand, 8% of global installed hydropower capacity (around 79 thousand Megawatt) complements irrigation, particularly in the Yellow and Yangtze River Basins of China, the East and West Coasts of the United States and most river basins of Southeast Asia, Canada and Russia. No significant relationship is found for the rest of the world. We further analyze the impact of climate variables on the relationships between hydropower and irrigation. Reservoir flood control functions that operate under increased precipitation levels appear to constrain hydroelectricity production in various river basins of the United States, South China and most basins in Europe and Oceania. On the other hand, increased reservoir evaporative losses and higher irrigation requirements due to higher potential evaporation levels may lead to increased tradeoffs between irrigation and hydropower due to reduced water availability in regions with warmer climates, such as India, South China, and the Southern United States. With most reservoirs today being built for multiple purposes, it is important for policymakers to understand and plan for growing tradeoffs between key functions. This will be particularly important as climate mitigation calls for an increase in renewable energy while agro-hydrological impacts of climate change, population and economic growth and associated dietary change increase the need for irrigated food production in many regions round the world.
The Development of Brazilian Municipalities Flooded by Hydropower Plants
NASA Astrophysics Data System (ADS)
Araujo, N.; Moretto, E. M.; Roquetti, D. R.; Beduschi, L. C.; Praia, A.; Pulice, S.; Albiach, E.; Athayde, S.
2016-12-01
Hydropower plants cause negative environmental impacts during the phases of construction and operation. On the other hand, there is a general assumption that these projects also induce local development of the affected places, since there is a great influx of social and financial capital brought locally, especially during the construction phase the relationship between hydropower plant implementation s and local development has been controversial in the Environmental Impact Assessment field, and there is no empirical evidence showing how hydroelectric dam construction affects local development. Considering municipal development as a kind of local development and operationalizing the concept of human development by adopting income, longevity and education dimensions defined by Amartya Sen, this study aimed to verify empirical evidences regarding the role of hydropower plants in human development of their flooded municipalities in Brazil. For this, we considered 134 hydroelectric plants and correspondent 641 flooded municipalities, for which 155 human development indicators were obtained for the period of 2000 to 2010. Results obtained from statistical correlation analysis and their assumption tests showed that increases in the municipal flooded area and increases in the period of flooding - to which a given municipality is submitted - were associated with lower performances of human development indicators. Specifically, increases in social inequality, poverty and lower performances of longevity and education were detected for the flooded municipalities. We also found that the financial compensation was associated with better performance of municipal income and lower performances of education and longevity. Finally, approaching the growth poles theory of François Perroux and the productive linkages theory of Albert Hirschman, we suggest that the size of the flooded areas, the flooding period and the financial compensation may lead to an enclave situation in municipalities flooded by hydropower plants, considering issues of education and longevity. Furthermore, it is likely that the labor force, investments and financial compensation inputs brought by these projects to the local municipalities are not strong enough to reverse this enclave scenario.
NASA Astrophysics Data System (ADS)
Ceola, Serena; Pugliese, Alessio; Castellarin, Attilio; Galeati, Giorgio
2015-04-01
Anthropogenic activities along streams and rivers are increasingly recognised to be a major concern for fluvial ecosystems. The management of water resources, by means of e.g. flow diversions and dams, for industrial, agricultural, water-supply, hydropower production and flood protection purposes induces significant changes to the natural streamflow regime of a river. Indeed, the river flow regime is known to be a major abiotic factor influencing fluvial ecosystems. An established approach aimed at preserving the behaviour and distribution of fluvial species relies on the definition of minimum streamflow requirements (i.e., environmental flows) downstream of dams and diversion structures. Such environmental flows are normally identified through methodologies that have an empirical nature and may not be representative of local ecological and hydraulic conditions. While the effect of imposing a minimum discharge release is easily predictable in terms of e.g. loss of hydropower production, the advantages in terms of species preferences are often poorly understood and seldom assessed. To analyse the interactions between flow releases and the behaviour and distribution of fluvial species (i.e., from periphyton, to benthic invertebrate and fish), one may use a habitat suitability curve, which is a fundamental tool capable of describing species preferences influenced by any generic environmental variable. The outcomes of a real case study applied to several Italian rivers, located in the Marche administrative district in Central Italy (∽10000km2), in which we quantitatively assess the effects of alternative environmental flow scenarios on the existing hydropower network and on two fish species that are quite abundant in the study area (i.e., Leuciscus cephalus cabeda and Barbus barbus plebejus), will be presented and discussed. The proposed analysis, which can be easily adapted to different riparian habitats and hydrological contexts, is a useful tool to guide the derivation of optimal water resource management strategies in order to ensure both hydropower production and fluvial ecosystem protection.
NASA Astrophysics Data System (ADS)
Castellarin, A.; Ceola, S.; Pugliese, A.; Galeati, G. A.
2015-12-01
Anthropogenic activities along streams and rivers are increasingly recognized to be a major concern for fluvial ecosystems. The management of water resources, by means of e.g. flow diversions and dams, for industrial, agricultural, water-supply, hydropower production and flood protection purposes induces significant changes to the natural streamflow regime of a river. Indeed, the river flow regime is known to be a major abiotic factor influencing fluvial ecosystems. An established approach aimed at preserving the behaviour and distribution of fluvial species relies on the definition of minimum streamflow requirements (i.e., environmental flows) downstream of dams and diversion structures. Such environmental flows are normally identified through methodologies that have an empirical nature and may not be representative of local ecological and hydraulic conditions. While the effect of imposing a minimum discharge release is easily predictable in terms of e.g. loss of hydropower production, the advantages in terms of species preferences are often poorly understood and seldom assessed. To analyze the interactions between flow releases and the behaviour and distribution of fluvial species (i.e., from periphyton, to benthic invertebrate and fish), one may use a habitat suitability curve, which is a fundamental tool capable of describing species preferences influenced by any generic environmental variable. The outcomes of a real case study applied to several Italian rivers, located in the Marche administrative district in Central Italy (∽10000km2), in which we quantitatively assess the effects of alternative environmental flow scenarios on the existing hydropower network and on two fish species that are quite abundant in the study area (i.e., Leuciscus cephalus cabeda and Barbus barbus plebejus), will be presented and discussed. The proposed analysis, which can be easily adapted to different riparian habitats and hydrological contexts, is a useful tool to guide the derivation of optimal water resource management strategies in order to ensure both hydropower production and fluvial ecosystem protection.
Indochina energy outlook. Report series Number 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, C.J.; Lamke, A.J.; Li, B.
1995-05-01
Indochina contains large energy resources of oil, gas, coal, and hydropower, and will become an important oil, gas, and electricity exporter in Southeast Asia over the next decade. The combination of substantial energy resources and economic reforms in Vietnam, Laos, and Cambodia are attracting major investments in the energy sector. This report discusses the economy; the resources, reserves, and projected production of oil, gas, coal, and hydropower; and electric power in Vietnam, Cambodia, and Laos. 10 refs., 7 figs., 3 tabs.
PNNL Fish Telemetry: Improving the Sustainability of Hydropower One Tag at a Time
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Evaluating the environmental impact of hydropower is critical to the growth, development, and maintenance of this vital energy source. Operators, developers, and regulators often turn to animal telemetry to measure the effect of dams on fish populations. PNNL’s tagging portfolio consists of a range of tags suitable for a variety of applications from active tags slightly larger than a grain of rice to larger tags that power themselves via a fish’s natural movement.
1985-10-01
fishes in the tailwater in relation to hydropower generation were apparent. The stomach contents of fishes in the holding tank (representing...tailwater or they may be flushed out of the tailwater. 26. Consumption of tailwater biota by fish appears to be related to daily flow regimes associated...macroinvertebrates ingested by the four species of fish investigated in this study were predomi- nantly larval stages of periphyton scrapers. Growth of tailwater
Optimization of Large-Scale Daily Hydrothermal System Operations With Multiple Objectives
NASA Astrophysics Data System (ADS)
Wang, Jian; Cheng, Chuntian; Shen, Jianjian; Cao, Rui; Yeh, William W.-G.
2018-04-01
This paper proposes a practical procedure for optimizing the daily operation of a large-scale hydrothermal system. The overall procedure optimizes a monthly model over a period of 1 year and a daily model over a period of up to 1 month. The outputs from the monthly model are used as inputs and boundary conditions for the daily model. The models iterate and update when new information becomes available. The monthly hydrothermal model uses nonlinear programing (NLP) to minimize fuel costs, while maximizing hydropower production. The daily model consists of a hydro model, a thermal model, and a combined hydrothermal model. The hydro model and thermal model generate the initial feasible solutions for the hydrothermal model. The two competing objectives considered in the daily hydrothermal model are minimizing fuel costs and minimizing thermal emissions. We use the constraint method to develop the trade-off curve (Pareto front) between these two objectives. We apply the proposed methodology on the Yunnan hydrothermal system in China. The system consists of 163 individual hydropower plants with an installed capacity of 48,477 MW and 11 individual thermal plants with an installed capacity of 12,400 MW. We use historical operational records to verify the correctness of the model and to test the robustness of the methodology. The results demonstrate the practicability and validity of the proposed procedure.
NASA Astrophysics Data System (ADS)
Mishra, Aanand Kumar; Singh, Ajay; Bahadur Singh, Akal
2018-06-01
High rise arc dams are widely used in the development of storage type hydropower project because of the economic advantage. Among different phases considered during the lifetime of dam, control of dam’s safety and performance becomes more concerned during the lifetime. This paper proposed the 3 – D finite element method (FEM) for stress and deformation analysis of double curvature arc dam considering the non – linearity of foundation rock following the Hoek – Brown Criterion. The proposed methodology is implemented through MATLAB scripting language and studied the double curvature arc dam proposed for Budhi Gandaki hydropower project. The stress developed in the foundation rock, compressive and tensile stress acting on the dam are investigated and analysed for the reservoir level variation. Deformation at the top of the dam and in the foundation rock is also investigated. In addition to that, stress and deformation variation in the foundation rock is analysed for various rock properties.
Climate change impacts on hydropower in the Swiss and Italian Alps.
Gaudard, Ludovic; Romerio, Franco; Dalla Valle, Francesco; Gorret, Roberta; Maran, Stefano; Ravazzani, Giovanni; Stoffel, Markus; Volonterio, Michela
2014-09-15
This paper provides a synthesis and comparison of methodologies and results obtained in several studies devoted to the impact of climate change on hydropower. By putting into perspective various case studies, we provide a broader context and improved understanding of climate changes on energy production. We also underline the strengths and weaknesses of the approaches used as far as technical, physical and economical aspects are concerned. Although the catchments under investigation are located close to each other in geographic terms (Swiss and Italian Alps), they represent a wide variety of situations which may be affected by differing evolutions for instance in terms of annual runoff. In this study, we also differentiate between run-of-river, storage and pumping-storage power plants. By integrating and comparing various analyses carried out in the framework of the EU-FP7 ACQWA project, this paper discusses the complexity as well as current and future issues of hydropower management in the entire Alpine region. © 2013 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lowry, Thomas Stephen; Chermak, Janie M.; Brookshire, David S.
This study presents a conceptual framework for capturing the spatial and temporal aspects of non-market dimensions of value (DOV) and how they vary as the result of policy changes for hydropower generation and developed water uses. The foundation of this project is a literature review that reveals that focused, sector specific valuations are no longer adequate if the goal is to provide decision makers with a complete understanding of their decisions. Rather, estimates of non-market values for informing decisions regarding dam operations and/or other water management alternatives must consider the entire spectrum of market and non-market values, and the tradeoffsmore » (both positive and negative) between those values over time and space, while considering shifting preferences in an uncertain environment. This document describes the history and reasoning for these conclusions and presents a conceptual framework for understanding non-market values as a function of changes to hydropower operations and water resources management.« less
NASA Astrophysics Data System (ADS)
Wang, Y.; Fang, D., VI; Xu, J.; Dong, Q.
2017-12-01
The Lancang-Mekong River is an important international river, cascaded hydropower stations development in which attracts the attention of downstream countries. In this paper, we proposed a coordination framework for water resources utilization on the interests of mutual compensation to relieve the conflict of upstream and downstream countries. Firstly, analyze the benefits and risks caused by the cascaded hydropower stations development and the evolution process of water resources use conflict between upstream and downstream countries. Secondly, evaluate the benefits and risks of flood control, water supply, navigation and power generation based on the energy theory of cascaded hydropower stations development in Lancang-Mekong River. Thirdly, multi-agent cooperation motivation and cooperation conditions between upstream and downstream countries in Lancang-Mekong River is given. Finally, the coordination framework for water resources utilization on the interests of mutual compensation in Lancang-Mekong River is presented. This coordination framework for water resources utilization can increase comprehensive benefits in Lancang-Mekong River.
Condition monitoring of a prototype turbine. Description of the system and main results
NASA Astrophysics Data System (ADS)
Valero, C.; Egusquiza, E.; Presas, A.; Valentin, D.; Egusquiza, M.; Bossio, M.
2017-04-01
The fast change in new renewable energy is affecting directly the required operating range of hydropower plants. According to the present demand of electricity, it is necessary to generate different levels of power. Because of its ease to regulate and its huge storage capacity of energy, hydropower is the unique energy source that can adapt to the demand. Today, the required operating range of turbine units is expected to extend from part load to overload. These extreme operations points can cause several pressure pulsations, cavitation and vibrations in different parts of the machine. To determine the effects on the machine, vibration measurements are necessary in actual machines. Vibrations can be used for machinery protection and to identify problems in the machine (diagnosis). In this paper, some results obtained in a hydropower plant are presented. The variation of global levels and vibratory signatures has been analysed as function as gross head, transducer location and operating points.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Brennan T; Jager, Yetta; March, Patrick
Reservoir releases are typically operated to maximize the efficiency of hydropower production and the value of hydropower produced. In practice, ecological considerations are limited to those required by law. We first describe reservoir optimization methods that include mandated constraints on environmental and other water uses. Next, we describe research to formulate and solve reservoir optimization problems involving both energy and environmental water needs as objectives. Evaluating ecological objectives is a challenge in these problems for several reasons. First, it is difficult to predict how biological populations will respond to flow release patterns. This problem can be circumvented by using ecologicalmore » models. Second, most optimization methods require complex ecological responses to flow to be quantified by a single metric, preferably a currency that can also represent hydropower benefits. Ecological valuation of instream flows can make optimization methods that require a single currency for the effects of flow on energy and river ecology possible. Third, holistic reservoir optimization problems are unlikely to be structured such that simple solution methods can be used, necessitating the use of flexible numerical methods. One strong advantage of optimal control is the ability to plan for the effects of climate change. We present ideas for developing holistic methods to the point where they can be used for real-time operation of reservoirs. We suggest that developing ecologically sound optimization tools should be a priority for hydropower in light of the increasing value placed on sustaining both the ecological and energy benefits of riverine ecosystems long into the future.« less
NASA Astrophysics Data System (ADS)
Chen, Bing-Rui; Li, Qing-Peng; Feng, Xia-Ting; Xiao, Ya-Xun; Feng, Guang-Liang; Hu, Lian-Xing
2014-10-01
Severe stress release has occurred to the surrounding rocks of the typically columnar jointed basalt after excavation at the Baihetan Hydropower Station, Jinsha River, China, where cracking, collapse, and other types of failure may take place occasionally due to relaxation fracture. In order to understand the relaxation fracture characteristics of the columnar jointed basalt in the entire excavation process at the diversion tunnel of the Baihetan Hydropower Station, real-time microseismic monitoring tests were performed. First, the applicability of a geophone and accelerometer was analyzed in the columnar jointed basalt tunnel, and the results show that the accelerometer was more applicable to the cracking monitoring of the columnar jointed basalt. Next, the waveform characteristics of the microseismic signals were analyzed, and the microseismic signals were identified as follows: rock fracture signal, drilling signal, electrical signal, heavy vehicle passing signal, and blast signal. Then, the attenuation characteristics of the microseismic signals in the columnar jointed basalt tunnel were studied, as well as the types and characteristics of the columnar jointed basalt fracture. Finally, location analysis was conducted on the strong rock fracture events, in which four or more sensors were triggered, to obtain the temporal and spatial evolution characteristics and laws of the columnar jointed basalt relaxation fracture after excavation. The test results are not only of important reference value to the excavation and support of diversion tunnel at the Baihetan Hydropower Station, but also of great referential significance and value to the conduction of similar tests.
Understanding the Amazon Hydrology for Sustainable Hydropower Development
NASA Astrophysics Data System (ADS)
Pokhrel, Y. N.; Chaudhari, S. N.
2017-12-01
Construction of 147 new hydropower dams, many of which are large, has been proposed in the Amazon river basin, despite the continuous stacking of negative impacts from the existing ones. These dams are continued to be built in a way that disrupts river ecology, causes large-scale deforestation, and negatively affects both the food systems nearby and downstream communities. In this study, we explore the impacts of the existing and proposed hydropower dams on the hydrological fluxes across the Amazonian Basin by incorporating human impact modules in an extensively validated regional hydrological model called LEAF-Hydro-Flood (LHF). We conduct two simulations, one in offline mode, forced by observed meteorological data for the historical period of 2000-2016 and the other in a coupled mode using the Weather Research and Forecasting (WRF) regional climate model. We mainly analyze terrestrial water storage and streamflow changes during the period of dam operations with and without human impacts. It is certain that the Amazon will undergo some major hydrological changes such as decrease in streamflow downstream in the coming decades caused due to these proposed dams. This study helps us understand and represent processes in a predictable manner, and provides the ability to evaluate future scenarios with dams and other major human influences while considering climate change in the basin. It also provides important insights on how to redesign the hydropower systems to make them truly renewable in terms of energy production, hydrology and ecology.
NASA Astrophysics Data System (ADS)
Rheinheimer, David E.; Bales, Roger C.; Oroza, Carlos A.; Lund, Jay R.; Viers, Joshua H.
2016-05-01
We assessed the potential value of hydrologic forecasting improvements for a snow-dominated high-elevation hydropower system in the Sierra Nevada of California, using a hydropower optimization model. To mimic different forecasting skill levels for inflow time series, rest-of-year inflows from regression-based forecasts were blended in different proportions with representative inflows from a spatially distributed hydrologic model. The statistical approach mimics the simpler, historical forecasting approach that is still widely used. Revenue was calculated using historical electricity prices, with perfect price foresight assumed. With current infrastructure and operations, perfect hydrologic forecasts increased annual hydropower revenue by 0.14 to 1.6 million, with lower values in dry years and higher values in wet years, or about $0.8 million (1.2%) on average, representing overall willingness-to-pay for perfect information. A second sensitivity analysis found a wider range of annual revenue gain or loss using different skill levels in snow measurement in the regression-based forecast, mimicking expected declines in skill as the climate warms and historical snow measurements no longer represent current conditions. The value of perfect forecasts was insensitive to storage capacity for small and large reservoirs, relative to average inflow, and modestly sensitive to storage capacity with medium (current) reservoir storage. The value of forecasts was highly sensitive to powerhouse capacity, particularly for the range of capacities in the northern Sierra Nevada. The approach can be extended to multireservoir, multipurpose systems to help guide investments in forecasting.
NASA Astrophysics Data System (ADS)
Riegels, Niels; Kromann, Mikkel; Karup Pedersen, Jesper; Lindgaard-Jørgensen, Palle; Sokolov, Vadim; Sorokin, Anatoly
2013-04-01
The water resources of the Aral Sea basin are under increasing pressure, particularly from the conflict over whether hydropower or irrigation water use should take priority. The purpose of the BEAM model is to explore the impact of changes to water allocation and investments in water management infrastructure on the overall welfare of the Aral Sea basin. The BEAM model estimates welfare changes associated with changes to how water is allocated between the five countries in the basin (Kazakhstan, Kyrgyz Republic, Tajikistan, Turkmenistan and Uzbekistan; water use in Afghanistan is assumed to be fixed). Water is allocated according to economic optimization criteria; in other words, the BEAM model allocates water across time and space so that the economic welfare associated with water use is maximized. The model is programmed in GAMS. The model addresses the Aral Sea Basin as a whole - that is, the rivers Syr Darya, Amu Darya, Kashkadarya, and Zarafshan, as well as the Aral Sea. The model representation includes water resources, including 14 river sections, 6 terminal lakes, 28 reservoirs and 19 catchment runoff nodes, as well as land resources (i.e., irrigated croplands). The model covers 5 sectors: agriculture (crops: wheat, cotton, alfalfa, rice, fruit, vegetables and others), hydropower, nature, households and industry. The focus of the model is on welfare impacts associated with changes to water use in the agriculture and hydropower sectors. The model aims at addressing the following issues of relevance for economic management of water resources: • Physical efficiency (estimating how investments in irrigation efficiency affect economic welfare). • Economic efficiency (estimating how changes in how water is allocated affect welfare). • Equity (who will gain from changes in allocation of water from one sector to another and who will lose?). Stakeholders in the region have been involved in the development of the model, and about 10 national experts, including staff from the International Fund for Saving the Aral Sea (IFAS), have been trained in using the model. The model is publicly accessible through a web-based user interface that allows users to investigate scenarios and perform sensitivity analyses. Preliminary results suggest that: 1. At the margin, hydropower water use increases basin-wide welfare more than irrigation water use. 2. Under normal or average hydrological conditions, water scarcity is not a significant problem in the basin. 3. Under dry hydrological conditions, water scarcity is significant. Under these conditions, preliminary results suggest that cotton irrigation is less effective than other uses, particularly in Turkmenistan. 4. Investments in irrigation efficiency can have a significant impact on the effectiveness of water use for irrigation, thereby increasing the welfare of irrigation regions during dry periods.
NASA Astrophysics Data System (ADS)
Haas, J.; Olivares, M. A.; Palma, R.
2013-12-01
In central Chile, water from reservoirs and streams is mainly used for irrigation and power generation. Hydropower reservoirs operation is particularly challenging because: i) decisions at each plant impact the entire power system, and ii) the existence of large storage capacity implies inter-temporal ties. An Independent System Operator (ISO) decides the grid-wide optimal allocation of water for power generation, under irrigation-related constraints. To account for the long-term opportunity cost of water, a future cost function is determined and used in the short term planning. As population growth and green policies demand increasing levels of renewable energy in power systems, deployment of wind farms and solar plants is rising quickly. However, their power output is highly fluctuating on short time scales, affecting the operation of power plants, particularly those fast responding units as hydropower reservoirs. This study addresses these indirect consequences of massive introduction of green energy sources on reservoir operations. Short-term reservoir operation, under different wind penetration scenarios, is simulated using a replica of Chile's ISO's scheduling optimization tools. Furthermore, an ongoing study is exploring the potential to augment the capacity the existing hydro-power plants to better cope with the balancing needs due to a higher wind power share in the system. As reservoir releases determine to a great extent flows at downstream locations, hourly time series of turbined flows for 24-hour periods were computed for selected combinations between new wind farms and increased capacity of existing hydropower plants. These time series are compiled into subdaily hydrologic alteration (SDHA) indexes (Zimmerman et al, 2010). The resulting sample of indexes is then analyzed using duration curves. Results show a clear increase in the SDHA for every reservoir of the system as more fluctuating renewables are integrated into the system. High-fluctuation events become more frequent. While the main load-following reservoirs are very susceptible to even small levels of additional wind power, the remaining withstand greater amounts before producing a significant SDHA. The additional effect of augmented installed capacity of existing hydropower plants on the SDHA is modest. The increase in SDHA calls for alternative operational constraints beyond the current practice based exclusively on minimum instream flows. Previous research by this group has shown the potential of maximum ramping rates constraints to efficiently achieve improvement in the SDHA. This alternative is being studied as part of a project currently in progress. This may contribute to make hydropower projects more socially acceptable and environmentally sound.
NASA Astrophysics Data System (ADS)
Buddendorf, Bas; Geris, Josie; Malcolm, Iain; Wilkinson, Mark; Soulsby, Chris
2016-04-01
Anthropogenic activity in riverine ecosystems has led to a substantial divergence from the natural state of many rivers globally. Many of Scotland's rivers have been regulated for hydropower with increasing intensity since the 1890s. At the same time they sustain substantial populations of Atlantic Salmon (Salmo salar L.), which have a range of requirements in terms of flow and access to habitat, depending on the different life-stages. River barriers for hydropower regulation can change the spatial and temporal connectivity within river networks, the impacts of which on salmon habitat are not fully understood. Insight into such changes in connectivity, and the link with the distribution and accessibility of suitable habitat and areas of high productivity, are essential to aid restoration and/or conservation efforts. This is because they indicate where such efforts might have a higher chance of being successful in terms of providing suitable habitat and increasing river productivity. In this study we applied a graph theory approach to assess historic (natural) and contemporary (regulated) in-stream habitat connectivity of the River Lyon, an important UK salmon river that is moderately regulated for hydropower. Historic maps and GIS techniques were used to construct the two contrasting river networks (i.e., natural vs. regulated). Subsequently, connectivity metrics were used to assess the impacts of hydropower infrastructure on upstream and downstream migration possibilities for adults and juveniles, respectively. A national juvenile salmon production model was used to weight the importance of reaches for juvenile salmon production. Results indicate that the impact of barriers in the Lyon on the connectivity indices depends on the type of barrier and its location within the network, but is generally low for both adults and juveniles, and that compared to the historic river network the reduction in the amount of suitable habitat and juvenile production is most marked in the upper reaches of the river. This study represents an improved approach over more commonly applied assessments that focus on the impact of impoundment on wetted area or river length. Simpler approaches often lack ecological and hydrological detail leading to over- or underestimation of the impacts of river regulation on connectivity depending on the relative quality of available habitat. Our work aims to integrate hydrological and ecological aspects into a spatially explicit connectivity framework. Such an approach can help to better identify those areas most important to the conservation of fish habitat, inform sustainable management of hydropower schemes, and aid cost-efficient river restoration and management efforts.
Application of dynamic programming to control khuzestan water resources system
Jamshidi, M.; Heidari, M.
1977-01-01
An approximate optimization technique based on discrete dynamic programming called discrete differential dynamic programming (DDDP), is employed to obtain the near optimal operation policies of a water resources system in the Khuzestan Province of Iran. The technique makes use of an initial nominal state trajectory for each state variable, and forms corridors around the trajectories. These corridors represent a set of subdomains of the entire feasible domain. Starting with such a set of nominal state trajectories, improvements in objective function are sought within the corridors formed around them. This leads to a set of new nominal trajectories upon which more improvements may be sought. Since optimization is confined to a set of subdomains, considerable savings in memory and computer time are achieved over that of conventional dynamic programming. The Kuzestan water resources system considered in this study is located in southwest Iran, and consists of two rivers, three reservoirs, three hydropower plants, and three irrigable areas. Data and cost benefit functions for the analysis were obtained either from the historical records or from similar studies. ?? 1977.
Role of pump hydro in electric power systems
NASA Astrophysics Data System (ADS)
Bessa, R.; Moreira, C.; Silva, B.; Filipe, J.; Fulgêncio, N.
2017-04-01
This paper provides an overview of the expected role that variable speed hydro power plants can have in future electric power systems characterized by a massive integration of highly variable sources. Therefore, it is discussed the development of a methodology for optimising the operation of hydropower plants under increasing contribution from new renewable energy sources, addressing the participation of a hydropower plant with variable speed pumping in reserve markets. Complementarily, it is also discussed the active role variable speed generators can have in the provision of advanced frequency regulation services.
Final Technical Report for DOE Award SC0006616
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robertson, Andrew
2015-08-01
This report summarizes research carried out by the project "Collaborative Research, Type 1: Decadal Prediction and Stochastic Simulation of Hydroclimate Over Monsoonal Asia. This collaborative project brought together climate dynamicists (UCLA, IRI), dendroclimatologists (LDEO Tree Ring Laboratory), computer scientists (UCI), and hydrologists (Columbia Water Center, CWC), together with applied scientists in climate risk management (IRI) to create new scientific approaches to quantify and exploit the role of climate variability and change in the growing water crisis across southern and eastern Asia. This project developed new tree-ring based streamflow reconstructions for rivers in monsoonal Asia; improved understanding of hydrologic spatio-temporal modesmore » of variability over monsoonal Asia on interannual-to-centennial time scales; assessed decadal predictability of hydrologic spatio-temporal modes; developed stochastic simulation tools for creating downscaled future climate scenarios based on historical/proxy data and GCM climate change; and developed stochastic reservoir simulation and optimization for scheduling hydropower, irrigation and navigation releases.« less
Interactions between land use, climate and hydropower in Scotland
NASA Astrophysics Data System (ADS)
Sample, James
2015-04-01
To promote the transition towards a low carbon economy, the Scottish Government has adopted ambitious energy targets, including generating all electricity from renewable sources by 2020. To achieve this, continued investment will be required across a range of sustainable technologies. Hydropower has a long history in Scotland and the present-day operational capacity of ~1.5 GW makes a substantial contribution to the national energy budget. In addition, there remains potential for ~500 MW of further development, mostly in the form of small to medium size run-of-river schemes. Climate change is expected to lead to an intensification of the global hydrological cycle, leading to changes in both the magnitude and seasonality of river flows. There may also be indirect effects, such as changing land use, enhanced evapotranspiration rates and an increased demand for irrigation, all of which could affect the water available for energy generation. Preliminary assessments of hydropower commonly use flow duration curves (FDCs) to estimate the power generation potential at proposed new sites. In this study, we use spatially distributed modelling to generate daily and monthly FDCs on a 1 km by 1 km grid across Scotland, using a variety of future land use and climate change scenarios. Parameter-related uncertainty in the model has been constrained using Bayesian Markov Chain Monte Carlo (MCMC) techniques to derive posterior probability distributions for key model parameters. Our results give an indication of the sensitivity and vulnerability of Scotland's run-of-river hydropower resources to possible changes in climate and land use. The effects are spatially variable and the range of uncertainty is sometimes large, but consistent patterns do emerge. For example, many locations are predicted to experience enhanced seasonality, with significantly lower power generation potential in the summer months and greater potential during the autumn and winter. Some sites may require infrastructural changes in order to continue operating at optimum efficiency. We discuss the implications and limitations of our results, and highlight design and adaptation options for maximising the resilience of hydropower installations under changing future flow patterns.
Can Horizontal Hydraulic Fracturing Lead to Less Expensive Achievement of More Natural River Flows?
NASA Astrophysics Data System (ADS)
Kern, J.; Characklis, G. W.
2014-12-01
High ramp rates and low costs make hydropower an extremely valuable resource for meeting "peak" hourly electricity demands, but dams that employ variable, stop-start reservoir releases can have adverse impacts on downstream riverine ecosystems. In recent years, efforts to mitigate the environmental impacts of hydropower peaking have relied predominantly on the use of ramp rate restrictions, or limits on the magnitude of hour-to-hour changes in reservoir discharge. These restrictions shift some hydropower production away from peak hours towards less valuable off-peak hours and impose a financial penalty on dam owners that is a function of: 1) the "spread" (difference) between peak and off-peak electricity prices; and 2) the total amount of generation shifted from peak to off-peak hours. In this study, we show how variability in both the price spread and reservoir inflows can cause large swings in the financial cost of ramp rate restrictions on a seasonal and annual basis. Of particular interest is determining whether current low natural gas prices (largely attributable to improvements in hydraulic fracturing) have reduced the cost of implementing ramp rate restrictions at dams by narrowing the spread between peak and off-peak electricity prices. We also examine the role that large year-to-year fluctuations in the cost of ramp rate restrictions may play in precluding downstream stakeholders (e.g., conservation trusts) from "purchasing" more natural streamflow patterns from dam owners. In recent years, similar arrangements between conservation trusts and consumptive water users have been put into practice in the U.S. for the purposes of supplementing baseflows in rivers. However, significant year-to-year uncertainty in the size of payments necessary to compensate hydropower producers for lost peaking production (i.e., uncertainty in the cost of ramp rate restrictions) makes transactions that aim to mitigate the environmental impacts of hydropower peaking untenable. In order to reduce this financial uncertainty, we propose the use of "collar" agreements between a downstream stakeholder and a third party insurer that would provide a stable price for parties "buying" more natural flows.
NASA Astrophysics Data System (ADS)
Lagron, C. S.; Ray, A. J.; Barsugli, J. J.
2016-12-01
The Federal Energy Regulatory Commission (FERC) issues licenses for non-federal hydropower projects through its Integrated Licensing Process (ILP). Through this multi-stage, multi-year decision process, NOAA National Marine Fisheries Service (NMFS) can request studies needed to prescribe license conditions to mitigate dams' effects on trust resources, e.g. fish passages and flow requirements. NMFS must understand the combined effects of hydropower projects and climate change to fulfill its mandates to maintain fisheries and protected species. Although 30-50 year hydropower licenses and renewals are within the time frame of anticipated risks from changing climate, FERC has consistently rejected NMFS' climate study requests, stating climate science is "too uncertain," and therefore not actionable. The ILP is an opportunity to incorporate climate change risks in this decision process, and to make decisions now to avoid failures later in the system regarding both hydropower reliability (the concern of FERC and the applicant) and ecosystem health (NMFS's concern). NMFS has partnered with climate scientists at the ESRL Physical Sciences Division to co-produce a climate study request for the relicensing of the Hiram Project on the Saco River in Southern Maine. The Saco hosts Atlantic salmon (Salmo salar) runs which are not currently self-sustaining. This presentation will describe basin-to-basin variability in both historic river analyses (Hydro-Climate Data Network, HCDN) and projected hydrologic responses of New England rivers to climate forcings using statewide Precipitation-Runoff Modeling System (PRMS) demonstrate the need to develop Saco-specific watershed models. Furthermore, although methods for projecting fishery-relevant metrics (heat waves, flood annual exceedance probabilities) have been proven in nearby basins, this modeling has not been conducted at fishery-relevant thresholds. Climate study requests are an example of bridging between science and applications. We argue that the current state of climate science provides actionable information on climate risks in the region, and will articulate the need and required elements for a Saco-specific climate study request.
NASA Astrophysics Data System (ADS)
Kibler, K. M.; Alipour, M.
2017-12-01
Diversion hydropower has been shown to significantly alter river flow regimes by dewatering diversion bypass reaches. Data scarcity is one of the foremost challenges to establishing environmental flow regimes below diversion hydropower dams, especially in regions of sparse hydro-meteorological observation. Herein, we test two prediction strategies for generating daily flows in rivers developed with diversion hydropower: a catchment similarity model, and a rainfall-runoff model selected by multi-objective optimization based on soft data. While both methods are designed for ungauged rivers embedded within large regions of sparse hydrologic observation, one is more complex and computationally-intensive. The objective of this study is to assess the benefit of using complex modeling tools in data-sparse landscapes to support design of environmental flow regimes. Models were tested in gauged catchments and then used to simulate a 28-year record of daily flows in 32 ungauged rivers. After perturbing flows with the hydropower diversion, we detect alteration using Indicators of Hydrologic Alteration (IHA) metrics and compare outcomes of the two modeling approaches. The catchment similarity model simulates low flows well (Nash-Sutcliff efficiency (NSE) = 0.91), but poorly represents moderate to high flows (overall NSE = 0.25). The multi-objective rainfall-runoff model performs well overall (NSE = 0.72). Both models agree that flow magnitudes and variability consistently decrease following diversion as temporally-dynamic flows are replaced by static minimal flows. Mean duration of events sustained below the pre-diversion Q75 and mean hydrograph rise and fall rates increase. While we see broad areas of agreement, significant effects and thresholds vary between models, particularly in the representation of moderate flows. Thus, use of simplified streamflow models may bias detected alterations or inadequately characterize pre-regulation flow regimes, providing inaccurate information as a basis for flow regime design. As an alternative, the multi-objective framework can be applied globally, and is robust to common challenges of flow prediction in ungauged rivers, such as equifinality and hydrologic dissimilarity of reference catchments.
Water Quality Projects Summary for the Mid-Columbia and Cumberland River Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, Kevin M.; Witt, Adam M.; Hadjerioua, Boualem
Scheduling and operational control of hydropower systems is accompanied with a keen awareness of the management of water use, environmental effects, and policy, especially within the context of strict water rights policy and generation maximization. This is a multi-objective problem for many hydropower systems, including the Cumberland and Mid-Columbia river systems. Though each of these two systems have distinct operational philosophies, hydrologic characteristics, and system dynamics, they both share a responsibility to effectively manage hydropower and the environment, which requires state-of-the art improvements in the approaches and applications for water quality modeling. The Department of Energy and Oak Ridge Nationalmore » Laboratory have developed tools for total dissolved gas (TDG) prediction on the Mid-Columbia River and a decision-support system used for hydropower generation and environmental optimization on the Cumberland River. In conjunction with IIHR - Hydroscience & Engineering, The University of Iowa and University of Colorado s Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), ORNL has managed the development of a TDG predictive methodology at seven dams along the Mid-Columbia River and has enabled the ability to utilize this methodology for optimization of operations at these projects with the commercially available software package Riverware. ORNL has also managed the collaboration with Vanderbilt University and Lipscomb University to develop a state-of-the art method for reducing high-fidelity water quality modeling results into surrogate models which can be used effectively within the context of optimization efforts to maximize generation for a reservoir system based on environmental and policy constraints. The novel contribution of these efforts is the ability to predict water quality conditions with simplified methodologies at the same level of accuracy as more complex and resource intensive computing methods. These efforts were designed to incorporate well into existing hydropower and reservoir system scheduling models, with runtimes that are comparable to existing software tools. In addition, the transferability of these tools to assess other systems is enhanced due the use of simplistic and easily attainable values for inputs, straight-forward calibration of predictive equation coefficients, and standardized comparison of traditionally familiar outputs.« less
Zeilhofer, Peter; Santos, Emerson Soares dos; Ribeiro, Ana LM; Miyazaki, Rosina D; Santos, Marina Atanaka dos
2007-01-01
Background Hydropower plants provide more than 78 % of Brazil's electricity generation, but the country's reservoirs are potential new habitats for main vectors of malaria. In a case study in the surroundings of the Manso hydropower plant in Mato Grosso state, Central Brazil, habitat suitability of Anopheles darlingi was studied. Habitat profile was characterized by collecting environmental data. Remote sensing and GIS techniques were applied to extract additional spatial layers of land use, distance maps, and relief characteristics for spatial model building. Results Logistic regression analysis and ROC curves indicate significant relationships between the environment and presence of An. darlingi. Probabilities of presence strongly vary as a function of land cover and distance from the lake shoreline. Vector presence was associated with spatial proximity to reservoir and semi-deciduous forests followed by Cerrado woodland. Vector absence was associated with open vegetation formations such as grasslands and agricultural areas. We suppose that non-significant differences of vector incidences between rainy and dry seasons are associated with the availability of anthropogenic breeding habitat of the reservoir throughout the year. Conclusion Satellite image classification and multitemporal shoreline simulations through DEM-based GIS-analyses consist in a valuable tool for spatial modeling of A. darlingi habitats in the studied hydropower reservoir area. Vector presence is significantly increased in forested areas near reservoirs in bays protected from wind and wave action. Construction of new reservoirs under the tropical, sub-humid climatic conditions should therefore be accompanied by entomologic studies to predict the risk of malaria epidemics. PMID:17343728
Seasonal-Scale Optimization of Conventional Hydropower Operations in the Upper Colorado System
NASA Astrophysics Data System (ADS)
Bier, A.; Villa, D.; Sun, A.; Lowry, T. S.; Barco, J.
2011-12-01
Sandia National Laboratories is developing the Hydropower Seasonal Concurrent Optimization for Power and the Environment (Hydro-SCOPE) tool to examine basin-wide conventional hydropower operations at seasonal time scales. This tool is part of an integrated, multi-laboratory project designed to explore different aspects of optimizing conventional hydropower operations. The Hydro-SCOPE tool couples a one-dimensional reservoir model with a river routing model to simulate hydrology and water quality. An optimization engine wraps around this model framework to solve for long-term operational strategies that best meet the specific objectives of the hydrologic system while honoring operational and environmental constraints. The optimization routines are provided by Sandia's open source DAKOTA (Design Analysis Kit for Optimization and Terascale Applications) software. Hydro-SCOPE allows for multi-objective optimization, which can be used to gain insight into the trade-offs that must be made between objectives. The Hydro-SCOPE tool is being applied to the Upper Colorado Basin hydrologic system. This system contains six reservoirs, each with its own set of objectives (such as maximizing revenue, optimizing environmental indicators, meeting water use needs, or other objectives) and constraints. This leads to a large optimization problem with strong connectedness between objectives. The systems-level approach used by the Hydro-SCOPE tool allows simultaneous analysis of these objectives, as well as understanding of potential trade-offs related to different objectives and operating strategies. The seasonal-scale tool will be tightly integrated with the other components of this project, which examine day-ahead and real-time planning, environmental performance, hydrologic forecasting, and plant efficiency.
Hirsch, Philipp Emanuel; Schillinger, Sebastian; Weigt, Hannes; Burkhardt-Holm, Patricia
2014-01-01
Water level fluctuations in lakes lead to shoreline displacement. The seasonality of flooding or beaching of the littoral area affects nutrient cycling, redox gradients in sediments, and life cycles of aquatic organisms. Despite the ecological importance of water level fluctuations, we still lack a method that assesses water levels in the context of hydropower operations. Water levels in reservoirs are influenced by the operator of a hydropower plant, who discharges water through the turbines or stores water in the reservoir, in a fashion that maximizes profit. This rationale governs the seasonal operation scheme and hence determines the water levels within the boundaries of the reservoir's water balance. For progress towards a sustainable development of hydropower, the benefits of this form of electricity generation have to be weighed against the possible detrimental effects of the anthropogenic water level fluctuations. We developed a hydro-economic model that combines an economic optimization function with hydrological estimators of the water balance of a reservoir. Applying this model allowed us to accurately predict water level fluctuations in a reservoir. The hydro-economic model also allowed for scenario calculation of how water levels change with climate change scenarios and with a change in operating scheme of the reservoir (increase in turbine capacity). Further model development will enable the consideration of a variety of additional parameters, such as water withdrawal for irrigation, drinking water supply, or altered energy policies. This advances our ability to sustainably manage water resources that must meet both economic and environmental demands.
NASA Astrophysics Data System (ADS)
Gragne, A. S.; Sharma, A.; Mehrotra, R.; Alfredsen, K.
2015-08-01
Accuracy of reservoir inflow forecasts is instrumental for maximizing the value of water resources and benefits gained through hydropower generation. Improving hourly reservoir inflow forecasts over a 24 h lead time is considered within the day-ahead (Elspot) market of the Nordic exchange market. A complementary modelling framework presents an approach for improving real-time forecasting without needing to modify the pre-existing forecasting model, but instead formulating an independent additive or complementary model that captures the structure the existing operational model may be missing. We present here the application of this principle for issuing improved hourly inflow forecasts into hydropower reservoirs over extended lead times, and the parameter estimation procedure reformulated to deal with bias, persistence and heteroscedasticity. The procedure presented comprises an error model added on top of an unalterable constant parameter conceptual model. This procedure is applied in the 207 km2 Krinsvatn catchment in central Norway. The structure of the error model is established based on attributes of the residual time series from the conceptual model. Besides improving forecast skills of operational models, the approach estimates the uncertainty in the complementary model structure and produces probabilistic inflow forecasts that entrain suitable information for reducing uncertainty in the decision-making processes in hydropower systems operation. Deterministic and probabilistic evaluations revealed an overall significant improvement in forecast accuracy for lead times up to 17 h. Evaluation of the percentage of observations bracketed in the forecasted 95 % confidence interval indicated that the degree of success in containing 95 % of the observations varies across seasons and hydrologic years.
Anderson, Elizabeth P.; Pringle, Catherine M.; Freeman, Mary C.
2008-01-01
Costa Rica has recently experienced a rapid proliferation of dams for hydropower on rivers draining its northern Caribbean slope. In the Sarapiquí River Basin, eight hydropower plants were built between 1990 and 1999 and more projects are either under construction or proposed. The majority of these dams are small (<15 m tall) and operate as water diversion projects.While the potential environmental effects of individual projects are evaluated prior to dam construction, there is a need for consideration of the basin-scale ecological consequences of hydropower development. This study was a first attempt to quantify the extent of river fragmentation by dams in the Sarapiquí River Basin.Using simple spatial analyses, the length of river upstream from dams and the length of de-watered reaches downstream from dams was measured. Results indicated that there are currently 306.8 km of river (9.4% of the network) upstream from eight existing dams in the Sarapiquí River Basin and 30.6 km of rivers (0.9% of the network) with significantly reduced flow downstream from dams. Rivers upstream from dams primarily drain two life zones: Premontane Rain Forest (107.9 km) and Lower Montane Rain Forest (168.2 km).Simple spatial analyses can be used as a predictive or planning tool for considering the effects of future dams in a basin-scale context. In the Sarapiquí River Basin, we recommend that future dam projects be constructed on already dammed rivers to minimize additional river fragmentation and to protect remaining riverine connectivity.
NASA Astrophysics Data System (ADS)
Crootof, A.
2017-12-01
Understanding coupled human-water dynamics offers valuable insights to address fundamental water resources challenges posed by environmental change. With hydropower reshaping human-water interactions in mountain river basins, there is a need for a socio-hydrology framework—which examines two-way feedback loops between human and water systems—to more effectively manage water resources. This paper explores the cross-scalar interactions and feedback loops between human and water systems in river basins affected by run-of-the-river hydropower and highlights the utility of a socio-hydrology perspectives to enhance water management in the face of environmental change. In the Himalayas, the rapid expansion of run-of-the-river hydropower—which diverts streamflow for energy generation—is reconfiguring the availability, location, and timing of water resources. This technological intervention in the river basin not only alters hydrologic dyanmics but also shapes social outcomes. Using hydropower development in the highlands of Uttarakhand, India as a case study, I first illustrate how run-of-the-river projects transform human-water dynamics by reshaping the social and physical landscape of a river basin. Second, I emphasize how examining cross-scalar feedbacks among structural dynamics, social outcomes, and values and norms in this coupled human-water system can inform water management. Third, I present hydrological and social literature, raised separately, to indicate collaborative research needs and knowledge gaps for coupled human-water systems affected by run-of-the-river hydropower. The results underscore the need to understand coupled human-water dynamics to improve water resources management in the face of environmental change.
Hirsch, Philipp Emanuel; Schillinger, Sebastian; Weigt, Hannes; Burkhardt-Holm, Patricia
2014-01-01
Water level fluctuations in lakes lead to shoreline displacement. The seasonality of flooding or beaching of the littoral area affects nutrient cycling, redox gradients in sediments, and life cycles of aquatic organisms. Despite the ecological importance of water level fluctuations, we still lack a method that assesses water levels in the context of hydropower operations. Water levels in reservoirs are influenced by the operator of a hydropower plant, who discharges water through the turbines or stores water in the reservoir, in a fashion that maximizes profit. This rationale governs the seasonal operation scheme and hence determines the water levels within the boundaries of the reservoir's water balance. For progress towards a sustainable development of hydropower, the benefits of this form of electricity generation have to be weighed against the possible detrimental effects of the anthropogenic water level fluctuations. We developed a hydro-economic model that combines an economic optimization function with hydrological estimators of the water balance of a reservoir. Applying this model allowed us to accurately predict water level fluctuations in a reservoir. The hydro-economic model also allowed for scenario calculation of how water levels change with climate change scenarios and with a change in operating scheme of the reservoir (increase in turbine capacity). Further model development will enable the consideration of a variety of additional parameters, such as water withdrawal for irrigation, drinking water supply, or altered energy policies. This advances our ability to sustainably manage water resources that must meet both economic and environmental demands. PMID:25526619
Zeilhofer, Peter; dos Santos, Emerson Soares; Ribeiro, Ana L M; Miyazaki, Rosina D; dos Santos, Marina Atanaka
2007-03-07
Hydropower plants provide more than 78 % of Brazil's electricity generation, but the country's reservoirs are potential new habitats for main vectors of malaria. In a case study in the surroundings of the Manso hydropower plant in Mato Grosso state, Central Brazil, habitat suitability of Anopheles darlingi was studied. Habitat profile was characterized by collecting environmental data. Remote sensing and GIS techniques were applied to extract additional spatial layers of land use, distance maps, and relief characteristics for spatial model building. Logistic regression analysis and ROC curves indicate significant relationships between the environment and presence of An. darlingi. Probabilities of presence strongly vary as a function of land cover and distance from the lake shoreline. Vector presence was associated with spatial proximity to reservoir and semi-deciduous forests followed by Cerrado woodland. Vector absence was associated with open vegetation formations such as grasslands and agricultural areas. We suppose that non-significant differences of vector incidences between rainy and dry seasons are associated with the availability of anthropogenic breeding habitat of the reservoir throughout the year. Satellite image classification and multitemporal shoreline simulations through DEM-based GIS-analyses consist in a valuable tool for spatial modeling of A. darlingi habitats in the studied hydropower reservoir area. Vector presence is significantly increased in forested areas near reservoirs in bays protected from wind and wave action. Construction of new reservoirs under the tropical, sub-humid climatic conditions should therefore be accompanied by entomologic studies to predict the risk of malaria epidemics.
The Himalayan hydro machine and space transmission power systems - An Asian dream of 21st century
NASA Astrophysics Data System (ADS)
Admoddie, M.
The advantages and disadvantages for the development of hydroelectric power are assessed for the Himalayan Rectangle, an area rising 1500 km north of a baseline between Karachi and Mandalay. This area has the potential for possessing one of the world's greatest power production capabilities. Among the disadvantages cited are the political instability and religious fundamentalism of the area, the bankrupt governments, environmental degradation, and inefficient power and irrigation systems. The advantages include the millions of talented and enterprising people in the region awaiting higher opportunities who are eager to improve their families' living standards and the large untapped hydropower resources. The concepts for hydropower development are discussed and go beyond the technologies of power and water. They include catchment ecodevelopment strategies with massive afforestation plans, setting up plans to strengthen village-level institutions to manage local natural biomass and water assets, the conversion of this regional hydropower potential into a subcontinental power system, and the exporting of power and the development of an interregional and international power grid by 2030, when both oil and local ecosystems would be dangerously depleted.
Managing Tradeoffs between Hydropower and the Environment in the Mekong River Basin
NASA Astrophysics Data System (ADS)
Loucks, Daniel P.; Wild, Thomas B.
2015-04-01
Hydropower dams are being designed and constructed at a rapid pace in the Mekong/Lancang River basin in Southeast Asia. These reservoirs are expected to trap significant amounts sediment, decreasing much of the river's capability to transport nutrients and maintain its geomorphology and habitats. We apply a simulation model for identifying and evaluating alternative dam siting, design and operating policy (SDO) options that could help maintain more natural sediment regimes downstream of dams and for evaluating the effect of these sediment-focused SDO strategies on hydropower production and reliability. We apply this approach to the planned reservoirs that would prevent a significant source of sediment from reaching critical Mekong ecosystems such as Cambodia's Tonle Sap Lake and the Mekong delta in Vietnam. Model results suggest that various SDO modifications could increase sediment discharge from this site by 300-450% compared to current plans, but a 30-55% loss in short-term annual energy production depending on various configurations of upstream reservoirs. Simulation results also suggest that sediment management-focused reservoir operating policies could cause ecological damage if they are not properly implemented.
Quadroni, Silvia; Crosa, Giuseppe; Gentili, Gaetano; Espa, Paolo
2017-12-31
The present work focuses on evaluating the ecological effects of hydropower-induced streamflow alteration within four catchments in the central Italian Alps. Downstream from the water diversions, minimum flows are released as an environmental protection measure, ranging approximately from 5 to 10% of the mean annual natural flow estimated at the intake section. Benthic macroinvertebrates as well as daily averaged streamflow were monitored for five years at twenty regulated stream reaches, and possible relationships between benthos-based stream quality metrics and environmental variables were investigated. Despite the non-negligible inter-site differences in basic streamflow metrics, benthic macroinvertebrate communities were generally dominated by few highly resilient taxa. The highest level of diversity was detected at sites where upstream minimum flow exceedance is higher and further anthropogenic pressures (other than hydropower) are lower. However, according to the current Italian normative index, the ecological quality was good/high on average at all of the investigated reaches, thus complying the Water Framework Directive standards. Copyright © 2017 Elsevier B.V. All rights reserved.
Uncertainty analysis in geospatial merit matrix–based hydropower resource assessment
Pasha, M. Fayzul K.; Yeasmin, Dilruba; Saetern, Sen; ...
2016-03-30
Hydraulic head and mean annual streamflow, two main input parameters in hydropower resource assessment, are not measured at every point along the stream. Translation and interpolation are used to derive these parameters, resulting in uncertainties. This study estimates the uncertainties and their effects on model output parameters: the total potential power and the number of potential locations (stream-reach). These parameters are quantified through Monte Carlo Simulation (MCS) linking with a geospatial merit matrix based hydropower resource assessment (GMM-HRA) Model. The methodology is applied to flat, mild, and steep terrains. Results show that the uncertainty associated with the hydraulic head ismore » within 20% for mild and steep terrains, and the uncertainty associated with streamflow is around 16% for all three terrains. Output uncertainty increases as input uncertainty increases. However, output uncertainty is around 10% to 20% of the input uncertainty, demonstrating the robustness of the GMM-HRA model. Hydraulic head is more sensitive to output parameters in steep terrain than in flat and mild terrains. Furthermore, mean annual streamflow is more sensitive to output parameters in flat terrain.« less
ERIC Educational Resources Information Center
Department of Energy, Washington, DC. Procurement and Contracts Management Directorate.
This guide is intended to orient research organizations interested in establishing a program relationship with the United States Department of Energy (DOE). The publication is divided into two parts. Part I describes DOE research and development programs, summarizes budget data, and lists contact persons for DOE programs. In addition, this section…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Corbus, David A; Jacobson, Mark D; Tan, Jin
As the deployment of wind and solar technologies increases at an unprecedented rate across the United States and in many world markets, the variability of power output from these technologies expands the need for increased power system flexibility. Energy storage can play an important role in the transition to a more flexible power system that can accommodate high penetrations of variable renewable technologies. This project focuses on how ternary pumped storage hydropower (T-PSH) coupled with dynamic transmission can help this transition by defining the system-wide benefits of deploying this technology in specific U.S. markets. T-PSH technology is the fastest respondingmore » pumped hydro technology equipment available today for grid services. T-PSH efficiencies are competitive with lithium-ion (Li-ion) batteries, and T-PSH can provide increased storage capacity with minimal degradation during a 50-year lifetime. This project evaluates T-PSH for grid services ranging from fast frequency response (FFR) for power system contingency events and enhanced power system stability to longer time periods for power system flexibility to accommodate ramping from wind and solar variability and energy arbitrage. In summary, this project: Compares power grid services and costs, including ancillary services and essential reliability services, for T-PSH and conventional pumped storage hydropower (PSH) - Evaluates the dynamic response of T-PSH and PSH technologies and their contribution to essential reliability services for grid stability by developing new power system model representations for T-PSH and performing simulations in the Western Interconnection - Evaluates production costs, operational impacts, and energy storage revenue streams for future power system scenarios with T-PSH focusing on time frames of 5 minutes and more - Assesses the electricity market-transforming capabilities of T-PSH technology coupled with transmission monitoring and dynamic control. This paper presents an overview of the methodology and initial, first-year preliminary findings of a 2-year in-depth study into how advanced PSH and dynamic transmission contribute to the transformation and modernization of the U.S. electric grid. This project is part of the HydroNEXT Initiative funded by the U.S. Department of Energy (DOE) that is focused on the development of innovative technologies to advance nonpowered dams and PSH. The project team consists of the National Renewable Energy Laboratory (project lead), Absaroka Energy, LLC (Montana-based PSH project developer), GE Renewable Energy (PSH pump/turbine equipment supplier), Grid Dynamics, and Auburn University (lead for NREL/Auburn dynamic modeling team).« less
DOE standard: The Department of Energy Laboratory Accreditation Program for radiobioassay
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-12-01
This technical standard describes the US Department of Energy Laboratory Accreditation Program (DOELAP) for Radiobioassay, for use by the US Department of Energy (DOE) and DOE Contractor radiobioassay programs. This standard is intended to be used in conjunction with the general administrative technical standard that describes the overall DOELAP accreditation process--DOE-STD-1111-98, Department of Energy Laboratory Accreditation Program Administration. This technical standard pertains to radiobioassay service laboratories that provide either direct or indirect (in vivo or in vitro) radiobioassay measurements in support of internal dosimetry programs at DOE facilities or for DOE and DOE contractors. Similar technical standards have been developedmore » for other DOELAP dosimetry programs. This program consists of providing an accreditation to DOE radiobioassay programs based on successful completion of a performance-testing process and an on-site evaluation by technical experts. This standard describes the technical requirements and processes specific to the DOELAP Radiobioassay Accreditation Program as required by 10 CFR 835 and as specified generically in DOE-STD-1111-98.« less
Examining the economic impacts of hydropower dams on property values using GIS.
Bohlen, Curtis; Lewis, Lynne Y
2009-07-01
While the era of dam building is largely over in the United States, globally dams are still being proposed and constructed. The articles in this special issue consider many aspects and impacts of dams around the world. This paper examines dam removal and the measurement of the impacts of dams on local community property values. Valuable lessons may be found. In the United States, hundreds of small hydropower dams will come up for relicensing in the coming decade. Whether or not the licenses are renewed and what happens to the dams if the licenses expires is a subject of great debate. Dams are beginning to be removed for river restoration and fisheries restoration and these "end-of-life" decisions may offer lessons for countries proposing or currently building small (and large) hydropower dams. What can these restoration stories tell us? In this paper, we examine the effects of dams along the Penobscot River in Maine (USA) on residential property values. We compare the results to findings from a similar (but ex post dam removal) data set for properties along the Kennebec river in Maine, where the Edwards Dam was removed in 1999. The Penobscot River Restoration Project, an ambitious basin-wide restoration effort, includes plans to remove two dams and decommission a third along the Penobscot River. Dam removal has significant effects on the local environment, and it is reasonable to anticipate that environmental changes will themselves be reflected in changes in property values. Here we examine historical real estate transaction data to examine whether landowners pay a premium or penalty to live near the Penobscot River or near a hydropower generating dam. We find that waterfront landowners on the Penobscot or other water bodies in our study area pay approximately a 16% premium for the privilege of living on the water. Nevertheless, landowners pay LESS to live near the Penobscot River than they do to live further away, contrary to the expectation that bodies of water function as real estate amenities and boost local property values. Results with respect to the effect of proximity to hydropower generating plants are equivocal. Homeowners pay a small premium for houses close to hydropower dams in our region, but the statistical significance of that result depends on the specific model form used to estimate the effect. Consideration of the social and economic impacts of dam removal-based river restoration can complement studies of the ecological impacts of the practice. Such studies help us understand the extent to which human society's subjective perception of value of aquatic ecosystems relates to objective measures of ecosystem health. The paper also illustrates how geographic information systems (GIS) can help inform these analyses.
NASA Astrophysics Data System (ADS)
Meier, Philipp; Schwemmle, Robin; Viviroli, Daniel
2015-04-01
The need for a reduction in greenhouse gas emissions and the decision to phase out nuclear power plants in Switzerland and Germany increases pressure to develop the remaining hydropower potential in Alpine catchments. Since most of the potential for large reservoirs is already exploited, future development focusses on small run-of-the-river hydropower plants (SHP). Being considered a relatively environment-friendly electricity source, investment in SHP is promoted through subsidies. However, SHP can have a significant impact on riverine ecosystems, especially in the Alpine region where residual flow reaches tend to be long. An increase in hydropower exploitation will therefore increase pressure on ecosystems. While a number of studies assessed the potential for hydropower development in the Alps, two main factors were so far not assessed in detail: (i) ecological impacts within a whole river network, and (ii) economic conditions under which electricity is sold. We present a framework that establishes trade-offs between multiple objectives regarding environmental impacts, electricity production and economic evaluation. While it is inevitable that some ecosystems are compromised by hydropower plants, the context of these impacts within a river network should be considered when selecting suitable sites for SHP. From an ecological point of view, the diversity of habitats, and therefore the diversity of species, should be maintained within a river basin. This asks for objectives that go beyond lumped parameters of hydrological alteration, but also consider habitat diversity and the spatial configuration. Energy production in run-of-the-river power plants depends on available discharge, which can have large fluctuations. In a deregulated electricity market with strong price variations, an economic valuation should therefore be based on the expected market value of energy produced. Trade-off curves between different objectives can help decision makers to define policies for licensing new SHP and for defining minimum flow requirements. The trade-offs are established using a multi-objective evolutionary algorithm. A case study on an Alpine catchment is presented. The position of water intake and outlet and the design capacity of SHP, and different environmental flow policies are used as decision variables. The calculation of complex objectives, as described above, relies on an accurate representation of the physical system. The river network is divided into segments of 500 meters length for each of which the slope is calculated. Natural incremental flows are calculated for each segment using the PREVAH hydrological modelling system. Trade-offs are established on the basin scale as well as on the sub-basin scale. This allows the assessment of the influence of different configurations of SHP on ecosystem quality across different spatial scales.
NASA Astrophysics Data System (ADS)
Regmi, D.; Kargel, J. S.; Leonard, G. J.; Haritashya, U. K.; Karki, A.; Poudyal, S.
2017-12-01
With long-term temperature increases due to climate change, glacier lakes in several parts of the world are a fast-developing threat to infrastructure and downstream communities. There are more than 2000 glacier lakes in Nepal; while most pose no significant hazard to people, a comparative few are very dangerous, such as Tso Rolpa, Imja, Barun and Thulagi glacier lakes. The objectives of this study are to present 1) a review of prior glacier lake studies that have been carried out in the Nepal Himalaya; 2) recent research results, including bathymetric studies of the lakes; 3) a summary of possible infrastructure damages, especially multi-million-dollar hydropower projects, that are under threat of glacier lake outburst floods (GLOFs); 4) to present the outcome of the recently completed Imja lake lowering project, which is the highest altitude lake ever controlled by lowering the water level. This project is being undertaken as a response to a scientific ground-based bathymetric and geophysical survey funded by the United Nations Development Program and a satellite-based study of the long-term development of the lake (funded by NASA's SERVIR program, J. Kargel, PI). The objective of the Imja Lake GLOF mitigation project is to lower the water level by three meters to reduce the lake volume, increase the freeboard, and improve the safety of tourism, downstream communities, and the infrastructure of Nepal's Everest region. This GLOF mitigation step taken by Nepal's government to reduce the risk of an outburst flood is a good step to reduce the chances of a GLOF, and to reduce the magnitude of a disaster if a GLOF nonetheless occurs despite our best efforts. We will also present the prospects for the future of Imja Lake, including an outline of possible steps that could further reduce the hazards faced by downstream communities and infrastructure. Key words: Glacier Lakes; GLOF; Hydropower; Imja lake; lake lowering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheffield, J.
Energy availability in a country is of great importance to its economy and to raising and maintaining its standard of living. In 1994, the United States consumed more than 88 quadrillion Btu (quads) of energy and spent about $500 billion on fuels and electricity. Fortunately, the United States is well endowed with energy sources, notably fossil fuels, and possesses a considerable nuclear power industry. The United States also has significant renewable energy resources and already exploits much of its hydropower resources, which represent 10% of electricity production. Nevertheless, in 1994, the United States imported about 45% of the petroleum productsmore » it consumed, equivalent to about 17 quads of energy. This dependence on imported oil puts the country at risk of energy supply disruptions and oil price shocks. Previous oil shocks may have cost the country as much as $4 billion (in 1993 dollars) between 1973 and 1990. Moreover, the production and use of energy from fossil fuels are major sources of environmental damage. The corresponding situation in many parts of the world is more challenging. Developing countries are experiencing rapid growth in population, energy demand, and the environmental degradation that often results from industrial development. The near-term depletion of energy resources in response to this rapid growth runs counter to the concept of ''sustainable development''--development that meets the needs of today without compromising the ability of future generations to meet their own needs. Energy research and development (R&D) to improve efficiency and to develop and deploy energy alternatives may be viewed, therefore, as an insurance policy to combat the dangers of oil shocks and environmental pollution and as a means of supporting sustainable development. These considerations guide the energy policy of the United States and of the U.S. Department of Energy (DOE). In its strategic plan, DOE identifies the fostering of ''a secure and reliable energy system that is environmentally and economically sustainable'' as the first component of its mission. The strategic goal established for energy resources, identified as one of DOE's four businesses, is for ''the Department of Energy and its partners [to] promote secure, competitive, and environmentally responsible energy systems that serve the needs of the public.'' DOE has also identified four strategic goals for its programs in energy resources: (1) strengthening the economy and raising living standards through improvements in the energy field; (2) protecting the environment by reducing the adverse environmental impacts associated with energy production, distribution, and use; (3) keeping America secure by reducing vulnerabilities to global energy market shocks; and (4) enhancing American competitiveness in a growing world energy market.« less
Deng, Zhiqun; Carlson, Thomas J.; Duncan, Joanne P.; ...
2010-10-13
Hydropower is the largest renewable energy resource in the United States and the world. However, hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydroturbines. In the Columbia and Snake River basins, dam operators and engineers are required to make those hydroelectric facilities more fish-friendly through changes in hydroturbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon under the Endangered Species Act of 1973. Public Utility District No. 2 of Grant County, Washington, requested authorization from the Federal Energy Regulatory Commission tomore » replace the ten turbines at Wanapum Dam with advanced hydropower turbines designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. As an additional measure to the primary metric of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device - the Sensor Fish - to provide insight into the specific hydraulic conditions and physical stresses experienced by the fish as well as the specific causes of fish biological response. We found that the new hydroturbine blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective in meeting the objectives of improving fish survival while enhancing operational efficiency of the dam. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by the balloon tag-recapture methodology. In addition, the new turbine provided a better pressure and rate of pressure change environment for fish passage. Altogether, the Sensor Fish data indicated that the advanced hydroturbine design improved passage of juvenile salmon at Wanapum Dam.« less
Quantification and Multi-purpose Allocation of Water Resources in a Dual-reservoir System
NASA Astrophysics Data System (ADS)
Salami, Y. D.
2017-12-01
Transboundary rivers that run through separate water management jurisdictions sometimes experience competitive water usage. Where the river has multiple existing or planned dams along its course, quantification and efficient allocation of water for such purposes as hydropower generation, irrigation for agriculture, and water supply can be a challenge. This problem is even more pronounced when large parts of the river basin are located in semi-arid regions known for water insecurity, poor crop yields from irrigation scheme failures, and human population displacement arising from water-related conflict. This study seeks to mitigate the impacts of such factors on the Kainji-Jebba dual-reservoir system located along the Niger River in Africa by seasonally quantifying and efficiently apportioning water to all stipulated uses of both dams thereby improving operational policy and long-term water security. Historical storage fluctuations (18 km3 to 5 km3) and flows into and out of both reservoirs were analyzed for relationships to such things as surrounding catchment contribution, dam operational policies, irrigation and hydropower requirements, etc. Optimum values of the aforementioned parameters were then determined by simulations based upon hydrological contributions and withdrawals and worst case scenarios of natural and anthropogenic conditions (like annual probability of reservoir depletion) affecting water availability and allocation. Finally, quantification and optimized allocation of water was done based on needs for hydropower, irrigation for agriculture, water supply, and storage evacuation for flood control. Results revealed that water supply potential increased by 69%, average agricultural yield improved by 36%, and hydropower generation increased by 54% and 66% at the upstream and downstream dams respectively. Lessons learned from this study may help provide a robust and practical means of water resources management in similar river basins and multi-reservoir systems.
Persistent and transient cost efficiency—an application to the Swiss hydropower sector
Filippini, Massimo; Geissmann, Thomas; Greene, William H.
2017-11-27
Electricity prices on the European market have decreased significantly over the past few years, resulting in a deterioration of Swiss hydropower firms’ competitiveness and profitability. One option to improve the sector’s competitiveness is to increase cost efficiency. The goal of this study is to quantify the level of persistent and transient cost efficiency of individual firms by applying the generalized true random effects (GTRE) model introduced by Colombi et al. (Journal of Productivity Analysis 42(2): 123–136, 2014) and Filippini and Greene (Journal of Productivity Analysis 45(2): 187–196, 2016). Applying this newly developed GTRE model to a total cost function, themore » level of cost efficiency of 65 Swiss hydropower firms is analyzed for the period between 2000 and 2013. A true random effects specification is estimated as a benchmark for the transient level of cost efficiency. The results show the presence of both transient as well as persistent cost inefficiencies. The GTREM predicts the aggregate level of cost inefficiency to amount to 21.8% (8.0% transient, 13.8% persistent) on average between 2000 and 2013. These two components differ in interpretation and implication. From an individual firm’s perspective, the two types of cost inefficiencies might require a firm’s management to respond with different improvement strategies. The existing level of persistent inefficiency could prevent the hydropower firms from adjusting their production processes to new market environments. From a regulatory point of view, the results of this study could be used in the scope and determination of the amount of financial support given to struggling firms.« less
Determining the effects of dams on subdaily variation in river flows at a whole-basin scale
Zimmerman, J.K.H.; Letcher, B.H.; Nislow, K.H.; Lutz, K.A.; Magilligan, F.J.
2010-01-01
River regulation can alter the frequency and magnitude of subdaily flow variations causing major impacts on ecological structure and function. We developed an approach to quantify subdaily flow variation for multiple sites across a large watershed to assess the potential impacts of different dam operations (flood control, run-of-river hydropower and peaking hydropower) on natural communities. We used hourly flow data over a 9-year period from 30 stream gages throughout the Connecticut River basin to calculate four metrics of subdaily flow variation and to compare sites downstream of dams with unregulated sites. Our objectives were to (1) determine the temporal scale of data needed to characterize subdaily variability; (2) compare the frequency of days with high subdaily flow variation downstream of dams and unregulated sites; (3) analyse the magnitude of subdaily variation at all sites and (4) identify individual sites that had subdaily variation significantly higher than unregulated locations. We found that estimates of flow variability based on daily mean flow data were not sufficient to characterize subdaily flow patterns. Alteration of subdaily flows was evident in the number of days natural ranges of variability were exceeded, rather than in the magnitude of subdaily variation, suggesting that all rivers may exhibit highly variable subdaily flows, but altered rivers exhibit this variability more frequently. Peaking hydropower facilities had the most highly altered subdaily flows; however, we observed significantly altered ranges of subdaily variability downstream of some flood-control and run-of-river hydropower dams. Our analysis can be used to identify situations where dam operating procedures could be modified to reduce the level of hydrologic alteration. ?? 2009 John Wiley & Sons, Ltd.
Persistent and transient cost efficiency—an application to the Swiss hydropower sector
DOE Office of Scientific and Technical Information (OSTI.GOV)
Filippini, Massimo; Geissmann, Thomas; Greene, William H.
Electricity prices on the European market have decreased significantly over the past few years, resulting in a deterioration of Swiss hydropower firms’ competitiveness and profitability. One option to improve the sector’s competitiveness is to increase cost efficiency. The goal of this study is to quantify the level of persistent and transient cost efficiency of individual firms by applying the generalized true random effects (GTRE) model introduced by Colombi et al. (Journal of Productivity Analysis 42(2): 123–136, 2014) and Filippini and Greene (Journal of Productivity Analysis 45(2): 187–196, 2016). Applying this newly developed GTRE model to a total cost function, themore » level of cost efficiency of 65 Swiss hydropower firms is analyzed for the period between 2000 and 2013. A true random effects specification is estimated as a benchmark for the transient level of cost efficiency. The results show the presence of both transient as well as persistent cost inefficiencies. The GTREM predicts the aggregate level of cost inefficiency to amount to 21.8% (8.0% transient, 13.8% persistent) on average between 2000 and 2013. These two components differ in interpretation and implication. From an individual firm’s perspective, the two types of cost inefficiencies might require a firm’s management to respond with different improvement strategies. The existing level of persistent inefficiency could prevent the hydropower firms from adjusting their production processes to new market environments. From a regulatory point of view, the results of this study could be used in the scope and determination of the amount of financial support given to struggling firms.« less
Premstaller, Georg; Cavedon, Valentina; Pisaturo, Giuseppe Roberto; Schweizer, Steffen; Adami, Vito; Righetti, Maurizio
2017-01-01
A hydropeaking mitigation project on Valsura River in the Italians Alps is described. The project is of particular interest due to several aspects. First of all, the Valsura torrent has unique morphological braiding characteristics, which are unique in the reach of Adige valley between Merano and Bolzano, and has a good reproduction potential for fish, especially in the terminal stretch along a biotope before its confluence with Adige River. Moreover, the Valsura hydropower cascade, which overall consists of six high-head hydropower plants, has an exceptional economic importance for the local hydropower industry. Lastly, the last HPP on the cascade is a multipurpose plant, so that interesting interactions between hydropeaking mitigation, irrigation supply and peak energy production are considered. The project started from a hydrological and a limnological measuring campaign and from an energetic, hydraulic and legislative framework analysis. The ecological findings are combined into a deficit analysis, founding the basis for the definition of a hydrological target state, which points to achieve a good natural reproduction for brown trout in the hydropeaked stretch, fulfilling at the same time the human safety conditions. Finally, mitigation Measures are described that at the same time comply with the following manifold aspects: a. maintenance of the requested target limits for fish reproduction; b. maintenance of the water release for the agricultural irrigation; c. enhancement of the flexibility of the hydropower plant's operation; d. reduction of the risk for local population. The paper compares operational and constructive mitigation measures and shows that constructive hydropeaking mitigation measures, for the present case study, can combine the positive effects of ecological improvement with higher safety standards and more flexible energy production. Copyright © 2016 Elsevier B.V. All rights reserved.
Pracheil, Brenda M.; DeRolph, Christopher R.; Schramm, Michael P.; ...
2016-01-01
One-way connectivity maintained by fish passing through hydropower turbines in fragmented rivers can be important to population dynamics, but can introduce a new and significant source of mortality due to turbine-associated mortality. Sources of mortality during downstream turbine passage can come from several sources including blade strike, shear forces, cavitation, or pressure decreases, and parsing the contributions of these individual forces is important for advancing and deploying turbines that minimize these impacts to fishes. We used a national hydropower database and conducted a systematic review of the literature to accomplish three goals: (1) report on the spatial distribution of turbinemore » types and generation capacities in the USA, (2) determine fish mortality rates among turbine types and fish species and (3) examine relationships between physical forces similar to those encountered during fish turbine passage and fish injury and mortality. We found that while Francis turbines generate 56% of all US hydropower and have the highest associated fish mortality of any turbine type, these turbines are proportionally understudied compared to less-common and less injury-associated Kaplan turbines, particularly in the Pacific Northwest. While juvenile salmonid species in actual or simulated Kaplan turbine conditions were the most commonly studied, the highest mortality rates were reported in percid fishes passing through Francis turbines. Also, although there are several mechanisms of turbine-associated injury, barotrauma was the most commonly studied with swim bladder rupture, exopthalmia, eye gas bubbles, and prolapsed cloaca being the most serious symptoms associated with rapid pressure decreases. Future studies should focus on understanding which species are most at-risk to turbine passage mortality and, subsequently, increasing the diversity of taxonomy and turbine types in evaluations of turbine mortality.« less
Anderson, Elizabeth P.; Freeman, Mary C.; Pringle, C.M.
2006-01-01
Small dams for hydropower have caused widespread alteration of Central American rivers, yet much of recent development has gone undocumented by scientists and conservationists. We examined the ecological effects of a small hydropower plant (Dona Julia Hydroelectric Center) on two low-order streams (the Puerto Viejo River and Quebradon stream) draining a mountainous area of Costa Rica. Operation of the Dona Julia plant has dewatered these streams, reducing discharge to ~ 10% of average annual flow. This study compared fish assemblage composition and aquatic habitat upstream and downstream of diversion dams on two streams and along a ~ 4 km dewatered reach of the Puerto Viejo River in an attempt to evaluate current instream flow recommendations for regulated Costa Rican streams. Our results indicated that fish assemblages directly upstream and downstream of the dam on the third order Puerto Viejo River were dissimilar, suggesting that the small dam (< 15 in high) hindered movement of fishes. Along the ~ 4 km dewatered reach of the Puerto Viejo River, species count increased with downstream distance from the dam. However, estimated species richness and overall fish abundance were not significantly correlated with downstream distance from the dam. Our results suggested that effects of stream dewatering may be most pronounced for a subset of species with more complex reproductive requirements, classified as equilibrium-type species based on their life-history. In the absence of changes to current operations, we expect that fish assemblages in the Puerto Viejo River will be increasingly dominated by opportunistic-type, colonizing fish species. Operations of many other small hydropower plants in Costa Rica and other parts of Central America mirror those of Doha Julia; the methods and results of this study may be applicable to some of those projects.
Fanaian, Safa; Graas, Susan; Jiang, Yong; van der Zaag, Pieter
2015-02-01
The flow regime of rivers, being an integral part of aquatic ecosystems, provides many important services benefiting humans in catchments. Past water resource developments characterized by river embankments and dams, however, were often dominated by one (or few) economic use(s) of water. This results in a dramatically changed flow regime negatively affecting the provision of other ecosystem services sustained by the river flow. This study is intended to demonstrate the value of alternative flow regimes in a river that is highly modified by the presence of large hydropower dams and reservoirs, explicitly accounting for a broad range of flow-dependent ecosystem services. In this study, we propose a holistic approach for conducting an ecological economic assessment of a river's flow regime. This integrates recent advances in the conceptualization and classification of ecosystem services (UK NEA, 2011) with the flow regime evaluation technique developed by Korsgaard (2006). This integrated approach allows for a systematic comparison of the economic values of alternative flow regimes, including those that are considered beneficial for aquatic ecosystems. As an illustration, we applied this combined approach to the Lower Zambezi Basin, Mozambique. Empirical analysis shows that even though re-operating dams to create environmentally friendly flow regimes reduces hydropower benefits, the gains to goods derived from the aquatic ecosystem may offset the forgone hydropower benefits, thereby increasing the total economic value of river flow to society. The proposed integrated flow assessment approach can be a useful tool for welfare-improving decision-making in managing river basins. Copyright © 2014 Elsevier B.V. All rights reserved.
Tonolla, Diego; Bruder, Andreas; Schweizer, Steffen
2017-01-01
New Swiss legislation obligates hydropower plant owners to reduce detrimental impacts on rivers ecosystems caused by hydropeaking. We used a case study in the Swiss Alps (hydropower company Kraftwerke Oberhasli AG) to develop an efficient and successful procedure for the ecological evaluation of such impacts, and to predict the effects of possible mitigation measures. We evaluated the following scenarios using 12 biotic and abiotic indicators: the pre-mitigation scenario (i.e. current state), the future scenario with increased turbine capacity but without mitigation measures, and future scenarios with increased turbine capacity and four alternative mitigation measures. The evaluation was based on representative hydrographs and quantitative or qualitative prediction of the indicators. Despite uncertainties in the ecological responses and the future operation mode of the hydropower plant, the procedure allowed the most appropriate mitigation measure to be identified. This measure combines a basin and a cavern at a total retention volume of 80,000m 3 , allowing for substantial dampening in the flow falling and ramping rates and in turn considerable reduction in stranding risk for juvenile trout and in macroinvertebrate drift. In general, this retention volume had the greatest predicted ecological benefit and can also, to some extent, compensate for possible modifications in the hydropower operation regime in the future, e.g. due to climate change, changes in the energy market, and changes in river morphology. Furthermore, it also allows for more specific seasonal regulations of retention volume during ecologically sensitive periods (e.g. fish spawning seasons). Overall experience gained from our case study is expected to support other hydropeaking mitigation projects. Copyright © 2016 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pracheil, Brenda M.; DeRolph, Christopher R.; Schramm, Michael P.
One-way connectivity maintained by fish passing through hydropower turbines in fragmented rivers can be important to population dynamics, but can introduce a new and significant source of mortality due to turbine-associated mortality. Sources of mortality during downstream turbine passage can come from several sources including blade strike, shear forces, cavitation, or pressure decreases, and parsing the contributions of these individual forces is important for advancing and deploying turbines that minimize these impacts to fishes. We used a national hydropower database and conducted a systematic review of the literature to accomplish three goals: (1) report on the spatial distribution of turbinemore » types and generation capacities in the USA, (2) determine fish mortality rates among turbine types and fish species and (3) examine relationships between physical forces similar to those encountered during fish turbine passage and fish injury and mortality. We found that while Francis turbines generate 56% of all US hydropower and have the highest associated fish mortality of any turbine type, these turbines are proportionally understudied compared to less-common and less injury-associated Kaplan turbines, particularly in the Pacific Northwest. While juvenile salmonid species in actual or simulated Kaplan turbine conditions were the most commonly studied, the highest mortality rates were reported in percid fishes passing through Francis turbines. Also, although there are several mechanisms of turbine-associated injury, barotrauma was the most commonly studied with swim bladder rupture, exopthalmia, eye gas bubbles, and prolapsed cloaca being the most serious symptoms associated with rapid pressure decreases. Future studies should focus on understanding which species are most at-risk to turbine passage mortality and, subsequently, increasing the diversity of taxonomy and turbine types in evaluations of turbine mortality.« less
NASA Astrophysics Data System (ADS)
Goode, J. R.; Candelaria, T.; Kramer, N. R.; Hill, A. F.
2016-12-01
As global energy demands increase, generating hydroelectric power by constructing dams and reservoirs on large river systems is increasingly seen as a renewable alternative to fossil fuels, especially in emerging economies. Many large-scale hydropower projects are located in steep mountainous terrain, where environmental factors have the potential to conspire against the sustainability and success of such projects. As reservoir storage capacity decreases when sediment builds up behind dams, high sediment yields can limit project life expectancy and overall hydropower viability. In addition, episodically delivered sediment from landslides can make quantifying sediment loads difficult. These factors, combined with remote access, limit the critical data needed to effectively evaluate development decisions. In the summer of 2015, we conducted a basic survey to characterize the geomorphology, hydrology and ecology of 620 km of the Rio Maranon, Peru - a major tributary to the Amazon River, which flows north from the semi-arid Peruvian Andes - prior to its dissection by several large hydropower dams. Here we present one component of this larger study: a first order analysis of potential sediment inputs to the Rio Maranon, Peru. To evaluate sediment delivery and storage in this system, we used high resolution Google Earth imagery to delineate landslides, combined with high resolution imagery from a DJI Phantom 3 Drone, flown at alluvial fan inputs to the river in the field. Because hillslope-derived sediment inputs from headwater tributaries are important to overall ecosystem health in large river systems, our study has the potential to contribute to the understanding the impacts of large Andean dams on sediment connectivity to the Amazon basin.
NASA Astrophysics Data System (ADS)
Hoang, L. P.; van Vliet, M. T. H.; Lauri, H.; Kummu, M.; Koponen, J.; Supit, I.; Leemans, R.; Kabat, P.; Ludwig, F.
2016-12-01
The Mekong River's flows and water resources are in many ways essential for sustaining economic growths, flood security of about 70 million people and biodiversity in one of the world's most ecologically productive wetland systems. The river's hydrological cycle, however, are increasingly perturbed by climate change, large-scale hydropower developments and rapid irrigated land expansions. This study presents an integrated impact assessment to characterize and quantify future hydrological changes induced by these driving factors, both separately and combined. We have integrated a crop simulation module and a hydropower dam module into a distributed hydrological model (VMod) and simulated the Mekong's hydrology under multiple climate change and development scenarios. Our results show that the Mekong's hydrological regime will experience substantial changes caused by the considered factors. Magnitude-wise, hydropower dam developments exhibit the largest impacts on river flows, with projected higher flows (up to +35%) during the dry season and lower flows (up to -44%) during the wet season. Annual flow changes caused by the dams, however, are relatively marginal. In contrast to this, climate change is projected to increase the Mekong's annual flows (up to +16%) while irrigated land expansions result in annual flow reductions (-1% to -3%). Combining the impacts of these three drivers, we found that river flow changes, especially those at the monthly scale, largely differ from changes under the individual driving factors. This is explained by large differences in impacts' magnitudes and contrasting impacts' directions for the individual drivers. We argue that the Mekong's future flows are likely driven by multiple factors and thus advocate for integrated assessment approaches and tools that support proper considerations of these factors and their interplays.
NASA Technical Reports Server (NTRS)
Wetzler, E.; Sand, F.; Stevenson, P.; Putnam, M.
1975-01-01
A case study analysis is presented of the relationships between improvements in the accuracy, frequency, and timeliness of information used in making hydrological forecasts and economic benefits in the areas of hydropower and irrigation. The area chosen for the case study is the Oroville Dam and Reservoir. Emphasis is placed on the use of timely and accurate mapping of the aerial extent of snow in the basin by earth resources survey systems such as LANDSAT. The subject of benefits resulting from improved runoff forecasts is treated in a generalized way without specifying the source of the improvements.
Developing hydropower in Washington state. Volume 2: An electricity marketing manual
NASA Astrophysics Data System (ADS)
James, J. W.; McCoy, G. A.
1982-03-01
An electricity marketing manual for the potential small and micro-hydroelectric project developer within the state of Washington is presented. Public utility regulatory policies (PURPA) requires electric utilities to interconnect with and pay a rate based on their full avoided costs for the purchase of electrical output from qualifying small power production facilities. The determination of avoided costs, as business organizational considerations, utility interface concerns, interconnection requirements, metering options, and liability and wheeling are discussed. The utility responses are summarized, legislation which is of importance to hydropower developers and the powers and functions of the authorities responsible for enforcing the mandate of PURPA are described.
NASA Astrophysics Data System (ADS)
Wang, Wanshun; Chen, Zhuo; Li, Xiuwen
2018-03-01
The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.
Development and bottlenecks of renewable electricity generation in China: a critical review.
Hu, Yuanan; Cheng, Hefa
2013-04-02
This review provides an overview on the development and status of electricity generation from renewable energy sources, namely hydropower, wind power, solar power, biomass energy, and geothermal energy, and discusses the technology, policy, and finance bottlenecks limiting growth of the renewable energy industry in China. Renewable energy, dominated by hydropower, currently accounts for more than 25% of the total electricity generation capacity. China is the world's largest generator of both hydropower and wind power, and also the largest manufacturer and exporter of photovoltaic cells. Electricity production from solar and biomass energy is at the early stages of development in China, while geothermal power generation has received little attention recently. The spatial mismatch in renewable energy supply and electricity demand requires construction of long-distance transmission networks, while the intermittence of renewable energy poses significant technical problems for feeding the generated electricity into the power grid. Besides greater investment in research and technology development, effective policies and financial measures should also be developed and improved to better support the healthy and sustained growth of renewable electricity generation. Meanwhile, attention should be paid to the potential impacts on the local environment from renewable energy development, despite the wider benefits for climate change.
Analyzing hydro abrasive erosion in Kaplan turbine: A case study from India
NASA Astrophysics Data System (ADS)
Rai, Anant Kr.; Kumar, Arun
2016-10-01
Sediment flow through hydro turbine causes erosion of hydraulic components resulting in drop of turbine efficiency, particularly in hydropower plants of the Himalayan region. The measurement of erosion and monitoring of sediment flow in turbine are major concerns in erosion study. Attempts have been made to study erosion mainly in Pelton and Francis turbines. In this study, a simple and effective method has been presented to measure erosion in a Kaplan turbine of a run-of-river scheme Chilla hydropower plant in foothills of Himalaya. Recent techniques were used to measure sediment parameters like concentration, size, shape and mineral content. A standard erosion model is applied to estimate the erosion in Kaplan turbine blade, runner chamber and draft tube cone. A calibration factor has been proposed to apply the erosion model for site specific conditions. It has been found that the outer trailing edges of the turbine blade and upper runner chamber are most erosion prone zones. Sediment analysis revealed that effective operation can reduce erosion in turbine components. The estimated erosion values from model are found to be consistent with measured values. Finally, suggestions for design improvements and effective operation of erosion affected hydropower plants are given.
Power plant maintenance scheduling using ant colony optimization: an improved formulation
NASA Astrophysics Data System (ADS)
Foong, Wai Kuan; Maier, Holger; Simpson, Angus
2008-04-01
It is common practice in the hydropower industry to either shorten the maintenance duration or to postpone maintenance tasks in a hydropower system when there is expected unserved energy based on current water storage levels and forecast storage inflows. It is therefore essential that a maintenance scheduling optimizer can incorporate the options of shortening the maintenance duration and/or deferring maintenance tasks in the search for practical maintenance schedules. In this article, an improved ant colony optimization-power plant maintenance scheduling optimization (ACO-PPMSO) formulation that considers such options in the optimization process is introduced. As a result, both the optimum commencement time and the optimum outage duration are determined for each of the maintenance tasks that need to be scheduled. In addition, a local search strategy is presented in this article to boost the robustness of the algorithm. When tested on a five-station hydropower system problem, the improved formulation is shown to be capable of allowing shortening of maintenance duration in the event of expected demand shortfalls. In addition, the new local search strategy is also shown to have significantly improved the optimization ability of the ACO-PPMSO algorithm.
Use of multicriteria analysis (MCA) for sustainable hydropower planning and management.
Vassoney, Erica; Mammoliti Mochet, Andrea; Comoglio, Claudio
2017-07-01
Multicriteria analysis (MCA) is a decision-making tool applied to a wide range of environmental management problems, including renewable energy planning and management. An interesting field of application of MCA is the evaluation and analysis of the conflicting aspects of hydropower (HP) exploitation, affecting the three pillars of sustainability and involving several different stakeholders. The present study was aimed at reviewing the state of the art of MCA applications to sustainable hydropower production and related decision-making problems, based on a detailed analysis of the scientific papers published over the last 15 years on this topic. The papers were analysed and compared, focusing on the specific features of the MCA methods applied in the described case studies, highlighting the general aspects of the MCA application (purpose, spatial scale, software used, stakeholders, etc.) and the specific operational/technical features of the selected MCA technique (methodology, criteria, evaluation, approach, sensitivity, etc.). Some specific limitations of the analysed case studies were identified and a set of "quality indexes" of an exhaustive MCA application were suggested as potential improvements for more effectively support decision-making processes in sustainable HP planning and management problems. Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Basso, Stefano; Lazzaro, Gianluca; Schirmer, Mario; Botter, Gianluca
2014-05-01
River flows withdrawals to supply small run-of-river hydropower plants have been increasing significantly in recent years - particularly in the Alpine area - as a consequence of public incentives aimed at enhancing energy production from renewable sources. This growth further raised the anthropic pressure in areas traditionally characterized by an intense exploitation of water resources, thereby triggering social conflicts among local communities, hydropower investors and public authorities. This brought to the attention of scientists and population the urgency for novel and quantitative tools for assessing the hydrologic impact of these type of plants, and trading between economic interests and ecologic concerns. In this contribution we propose an analytical framework that allows for the estimate of the streamflow availability for hydropower production and the selection of the run-of-river plant capacity, as well as the assessment of the related profitability and environmental impacts. The method highlights the key role of the streamflow variability in the design process, by showing the significance control of the coefficient of variation of daily flows on the duration of the optimal capacity of small run-of-river plants. Moreover, the analysis evidences a gap between energy and economic optimizations, which may result in the under-exploitation of the available hydropower potential at large scales. The disturbances to the natural flow regime produced between the intake and the outflow of run-of-river power plants are also estimated within the proposed framework. The altered hydrologic regime, described through the probability distribution and the correlation function of streamflows, is analytically expressed as a function of the natural regime for different management strategies. The deviations from pristine conditions of a set of hydrologic statistics are used, jointly with an economic index, to compare environmental and economic outcomes of alternative plant setups and management strategies. Benefits connected to ecosystem services provided by unimpaired riverine environments can be also included in the analysis, possibly accounting for the disruptive effect of multiple run-of-river power plants built in cascade along the same river. The application to case studies in the Alpine region shows the potential of the tool to assess different management strategies and design solution, and to evaluate local and catchment scale impacts of small run-of-river hydropower development.
NASA Astrophysics Data System (ADS)
Hogeboom, Rick; Knook, Luuk; Hoekstra, Arjen
2017-04-01
Increasing the availability of freshwater to meet growing and competing demands is on many policy agendas. The Sustainable Development Goals (SDGs) prescribe sustainable management of water for human consumption. For centuries humans have resorted to building dams to store water in periods of excess for use in times of shortage. Although dams and their reservoirs have made important contributions to human development, it is increasingly acknowledged that reservoirs can be substantial water consumers as well. We estimated the water footprint of human-made reservoirs on a global scale and attributed it to the various reservoir purposes (hydropower generation, residential and industrial water supply, irrigation water supply, flood protection, fishing and recreation) based on their economic value. We found that economic benefits from derived products and services from 2235 reservoirs globally, amount to 311 billion US dollar annually, with residential and industrial water supply and hydropower generation as major contributors. The water footprint associated with these benefits is the sum of the water footprint of dam construction (< 1 % contribution) and evaporation from the reservoir's surface area. The latter was calculated as an ensemble mean of four different methods for estimating open water evaporation. The total water footprint of reservoirs globally adds up to ˜104 km3yr-1. Attribution per purpose shows that, with a global average water footprint of 21,5 m3GJ,-1 hydropower on average is a water intensive form of energy. We contextualized the water footprint of reservoirs and their purposes with regard to the water scarcity level of the river basin in which they occur. We found the lion's share (55%) of the water footprint is located in non-water scarce basins and only 1% in year-round scarce basins. The purpose for which the reservoir is primarily used changes with increasing water scarcity, from mainly hydropower generation in non-scarce basins, to the (more essential) purposes residential and industrial water supply, irrigation and flood control in scarcer areas. The quantitative explication of how the burden of water consumption from reservoirs is shared between its beneficiaries as proposed in this study, can contribute to reaching the desired sustainable management of finite freshwater resources as proposed by SDG 6.
Basin-scale impacts of hydropower development on the Mompós Depression wetlands, Colombia
NASA Astrophysics Data System (ADS)
Angarita, Héctor; Wickel, Albertus J.; Sieber, Jack; Chavarro, John; Maldonado-Ocampo, Javier A.; Herrera-R., Guido A.; Delgado, Juliana; Purkey, David
2018-05-01
A number of large hydropower dams are currently under development or in an advanced stage of planning in the Magdalena River basin, Colombia, spelling uncertainty for the Mompós Depression wetlands, one of the largest wetland systems in South America at 3400 km2. Annual large-scale inundation of floodplains and their associated wetlands regulates water, nutrient, and sediment cycles, which in turn sustain a wealth of ecological processes and ecosystem services, including critical food supplies. In this study, we implemented an integrated approach focused on key attributes of ecologically functional floodplains: (1) hydrologic connectivity between the river and the floodplain, and between upstream and downstream sections; (2) hydrologic variability patterns and their links to local and regional processes; and (3) the spatial scale required to sustain floodplain-associated processes and benefits, like migratory fish biodiversity. The implemented framework provides an explicit quantification of the nonlinear or direct response relationship of those considerations with hydropower development. The proposed framework was used to develop a comparative analysis of the potential effects of the hydropower expansion necessary to meet projected 2050 electricity requirements. As part of this study, we developed an enhancement of the Water Evaluation and Planning system (WEAP) that allows resolution of the floodplains water balance at a medium scale (˜ 1000 to 10 000 km2) and evaluation of the potential impacts of upstream water management practices. In the case of the Mompós Depression wetlands, our results indicate that the potential additional impacts of new hydropower infrastructure with respect to baseline conditions can range up to one order of magnitude between scenarios that are comparable in terms of energy capacity. Fragmentation of connectivity corridors between lowland floodplains and upstream spawning habitats and reduction of sediment loads show the greatest impacts, with potential reductions of up to 97.6 and 80 %, respectively, from pre-dam conditions. In some development scenarios, the amount of water regulated and withheld by upstream infrastructure is of similar magnitude to existing fluxes involved in the episodic inundation of the floodplain during dry years and, thus, can also induce substantial changes in floodplain seasonal dynamics of average-to-dry years in some areas of the Mompós Depression.
Valuing hydrological alteration in Multi-Objective reservoir management
NASA Astrophysics Data System (ADS)
Bizzi, S.; Pianosi, F.; Soncini-Sessa, R.
2012-04-01
Water management through dams and reservoirs is worldwide necessary to support key human-related activities ranging from hydropower production to water allocation for agricultural production, and flood risk mitigation. Advances in multi-objectives (MO) optimization techniques and ever growing computing power make it possible to design reservoir operating policies that represent Pareto-optimal tradeoffs between the multiple interests analysed. These progresses if on one hand are likely to enhance performances of commonly targeted objectives (such as hydropower production or water supply), on the other risk to strongly penalize all the interests not directly (i.e. mathematically) optimized within the MO algorithm. Alteration of hydrological regime, although is a well established cause of ecological degradation and its evaluation and rehabilitation are commonly required by recent legislation (as the Water Framework Directive in Europe), is rarely embedded as an objective in MO planning of optimal releases from reservoirs. Moreover, even when it is explicitly considered, the criteria adopted for its evaluation are doubted and not commonly trusted, undermining the possibility of real implementation of environmentally friendly policies. The main challenges in defining and assessing hydrological alterations are: how to define a reference state (referencing); how to define criteria upon which to build mathematical indicators of alteration (measuring); and finally how to aggregate the indicators in a single evaluation index that can be embedded in a MO optimization problem (valuing). This paper aims to address these issues by: i) discussing benefits and constrains of different approaches to referencing, measuring and valuing hydrological alteration; ii) testing two alternative indices of hydrological alteration in the context of MO problems, one based on the established framework of Indices of Hydrological Alteration (IHA, Richter et al., 1996), and a novel satisfying the mathematical properties required by widely used optimization methods based on dynamic programming; iii) discussing the ranking provided by the proposed indices for a case study in Italy where different operating policies were designed using a MO algorithm, taking into account hydropower production, irrigation supply and flood mitigation and imposing different type of minimum environmental flow; iv) providing a framework to effectively include hydrological alteration within MO problem of reservoir management. Richter, B.D., Baumgartner, J.V., Powell, J., Braun, D.P., 1996, A Method for Assessing Hydrologic Alteration within Ecosystems, Conservation Biology, 10(4), 1163-1174.
Fossil Energy Program Annual Progress Report for the Period April 1, 2000 through March 31, 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Judkins, RR
This report covers progress made at Oak Ridge National Laboratory (ORNL) on research and development projects that contribute to the advancement of fossil energy technologies. Projects on the ORNL Fossil Energy Program are supported by the U.S. Department of Energy (DOE) Office of Fossil Energy, the DOE National Energy Technology Laboratory (NETL), the DOE Fossil Energy Clean Coal Technology (CCT) Program, the DOE National Petroleum Technology Office, and the DOE Fossil Energy Office of Strategic Petroleum Reserve (SPR). The ORNL Fossil Energy Program research and development activities cover the areas of coal, clean coal technology, gas, petroleum, and support tomore » the SPR. An important part of the Fossil Energy Program is technical management of all activities on the DOE Fossil Energy Advanced Research (AR) Materials Program. The AR Materials Program involves research at other DOE and government laboratories, at universities, and at industrial organizations.« less
LONG-TERM STEWARDSHIP AT DOE HANFORD SITE - 12575
DOE Office of Scientific and Technical Information (OSTI.GOV)
MOREN RJ; GRINDSTAFF KD
2012-01-11
The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currentlymore » planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)[1], which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S&M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation between the contractors and DOE-RL. Information Management (IM) is a key part of the LTS program. The IM Program identifies, locates, stores, protects and makes accessible Hanford LTS records and data to support the transfer of property ultimately to LM. As such, DOE-RL manages the Hanford LTS Program in a manner consistent with LM's goals, policies, and procedures.« less
NASA Astrophysics Data System (ADS)
Tilmant, Amaury; Marques, Guilherme
2016-04-01
Among the environmental impacts caused by dams, the alteration of flow regimes is one of the most critical to river ecosystems given its influence in long river reaches and its continuous pattern. Provided it is technically feasible, the reoperation of hydroelectric reservoir systems can, in principle, mitigate the impacts on degraded freshwater ecosystems by recovering some of the natural flow regime. The typical approach to implement hydropower-to-environment water transfers focuses on the reoperation of the dam located immediately upstream of the environmentally sensitive area, meaning that only one power station will bear the brunt of the benefits forgone for the power sector. By ignoring the contribution of upstream infrastructures to the alteration of the flow regime, the opportunity cost associated with the restoration of a flow regime is not equitably distributed among the power companies in the river basin, therefore slowing the establishment of environmental flow programs. Yet, there is no criterion, nor institutional mechanisms, to ensure a fair distribution of the opportunity cost among power stations. This paper addresses this issue by comparing four rules to redistribute the costs faced by the power sector when environmental flows must be implemented in a multireservoir system. The rules are based on the the installed capacity of the power plants, the live storage capacity of the reservoirs, the ratio between the incremental flows and the live storage capacity, and the extent of the storage services; that is, the volume of water effectively transferred by each reservoir. The analysis is carried out using the Parana River Basin (Brazil) as a case study.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Training programs at DOE facilities should prepare personnel to safely and efficiently operate and maintain the facilities in accordance with DOE requirements. This guide presents good practices for a systematic approach to on-the-job training (OJT) and OJT programs and should be used in conjunction with DOE Training Program Handbook: A Systematic Approach to Training, and with the DOE Handbook entitled Alternative Systematic Approaches to Training to develop performance-based OJT programs. DOE contractors may also use this guide to modify existing OJT programs that do not meet the systematic approach to training (SAT) objectives.
Study on load test of 100m cross-reinforced deck type concrete box arch bridge
NASA Astrophysics Data System (ADS)
Shi, Jing Xian; Cheng, Ying Jie
2018-06-01
Found in the routine quality inspection of highway bridge that many vertical fractures on the main beam (10mT beam) of the steel reinforced concrete arch bridge near the hydropower station. In order to grasp the bearing capacity of this bridge under working conditions with cracks, the static load and dynamic load test of box arch bridge are carried out. The Midas civil theory is calculated by using the special plate trailer - 300 as the calculation load, and the deflection and stress of the critical section are tested by the equivalent cloth load in the test vehicle. The pulsation test, obstacles and no obstacle driving test were carried out. Experimental results show that the bridge under the condition of the test loads is in safe condition, main bearing component of the strength and stiffness meet the design requirements, the crack width does not increase, in the process of loading bridge overall work performance is good.