75 FR 16786 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... EIS, BLM, CA, Palen Solar Power Plant Project, Construction, Operation and Decommission a Solar... No. 20100107, Draft EIS, BLM, CA, Calico Solar Project, Proposed Solar Thermal Electricity Generation... 04/02/2010. EIS No. 20100054, Draft EIS, NASA, VA, Wallops Flight Facility, Shoreline Restoration and...
75 FR 18204 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
.... 20100108, Draft EIS, BLM, AZ, Sonoran Solar Energy Project, Construction and Operation of a 3756-megawatt (MW) Concentrated Solar Thermal Power Plant and Ancillary Facilities on 3,702 Acres, Right-of- Way..., Contact: Louis Moore 916-978-5106. EIS No. 20100111, Draft EIS, BLM, CA, Ridgecrest Solar Power Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
...] Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM AGENCY... prepared a Draft Environmental Impact Statement (EIS) for the HB In- Situ Solution Mine Project, and by... considered, the BLM must receive written comments on the HB In-Situ Solution Mine Project Draft EIS within 60...
75 FR 11881 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
..., Draft EIS, BLM, CA, Stirling Energy Systems (SES) Solar 2 Project, Construct and Operate, Electric.../2010: Correction to Comment Period from 04/12/2010 to 04/26/2010. EIS No. 20100054, Draft EIS, NASA, VA... FR Notice Published 02/26/2010: Correction to Document Agency from NOAA to NASA. Dated: March 9, 2010...
76 FR 45554 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
.... 20110231, Final EIS, BLM, NV, Salt Wells Energy Projects, Proposal for Three Separate Geothermal Energy and.... EIS No. 20110241, Draft EIS, NNSA, NV, Site-Wide EIS--Continued Operation of the Department of Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... amended, the Bureau of Land Management (BLM), Battle Mountain District, Mount Lewis Field Office, Battle Mountain, Nevada, has prepared a Draft Supplemental Environmental Impact Statement (EIS) for the Cortez... meetings in Crescent Valley and Battle Mountain, Nevada. The BLM will announce future meetings or hearings...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
... comments related to the Hycroft Mine Expansion Draft EIS by any of the following methods: Web site: www.blm..., Nevada 89445, Attn. Kathleen Rehberg. Copies of the Hycroft Mine Expansion Draft EIS are available in the... hours. The FIRS is available 24 hours a day, 7 days a week, to leave a message or question with the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-08
...The Bureau of Land Management (BLM) announces a re-opening of the comment period on the Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Clear Creek Management Area (CCMA). The original notice was published in the Federal Register on December 4, 2009 [74 FR 0232] and provided for a comment period to end on March 5, 2010. The BLM is re-opening the comment period to end April 19, 2010.
78 FR 29131 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-17
...-202- 3960. EIS No. 20130126, Final EIS, BLM, AZ, Mohave County Wind Farm Project, Review Period Ends..., Contact: Doug Grupenhoff 406-827-0741. EIS No. 20130129, Draft EIS, USA, TX, Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort Bliss, Texas and New Mexico, Comment Period...
77 FR 26547 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
..., Contact: Bill Dragt 541-573-4473. EIS No. 20120132, Draft EIS, BLM, CA, Haiwee Geothermal Leasing Area, Evaluation of Potential Impacts of Opening for Lease of Federal Mineral Estate for Geothermal Energy...
75 FR 70917 - Environmental Impacts Statements; Notice Of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... Augustin 651-290-5378. Amended Notices EIS No. 20100386, Draft EIS, BLM, UT, Uinta Basin Natural Gas Development Project, To Develop Oil and Natural Gas Resources within the Monument Butte-Red Wash and West...
77 FR 25165 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
.... EIS No. 20120117, Draft EIS, BLM, WY, Lost Creek In Situ Recovery Project, To Analyze the Site... agencies to participate in its e-NEPA electronic EIS submission pilot. Participating agencies can fulfill... filing documents online and providing feedback on the process. To participate in the pilot, register at...
76 FR 44000 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-22
..., NV, Salt Wells Energy Projects, Proposal for Three Separate Geothermal Energy and Transmission...-328-4200. EIS No. 20110233, Draft EIS, BLM, WY, Chokecherry and Sierra Madre Wind Energy Project, Proposes to Construct and Operate a Wind Energy Project, South of Rawlins, Carbon County, WY, Comment...
78 FR 40474 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
..., Draft EIS, USA, TX, Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort... Land Management (BLM) has adopted the Federal Energy Regulatory Commission's FEIS 20100001, filed 01/07.... 20130197, Final EIS, USACE, FL, Everglades Agricultural Area A- 1 Shallow Flow Equalization Basin, Review...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
...; 13-08807; MO 4500049868; TAS: 14X5017] Notice of Intent To Prepare a Draft Supplemental Environmental...: Notice of Intent. SUMMARY: As directed by the United States Court of Appeals for the Ninth Circuit, the Bureau of Land Management (BLM) is preparing a Draft Supplemental Environmental Impact Statement (EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
... of the Draft Programmatic Environmental Impact Statement for Allocation of Oil Shale and Tar Sands... of Oil Shale and Tar Sands Resources on Lands Administered by the BLM in Colorado, Utah, and Wyoming... preferred method of commenting. Mail: Addressed to: Oil Shale and Tar Sands Resources Draft Programmatic EIS...
75 FR 13275 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Dimmett 208-382- 7400. EIS No. 20100083, Draft EIS, BLM, NV, Amargosa Farm Road Solar Energy Project, Construction and Operation of Two Concentrated Solar Power Plant Facilities, Right-of-Way Application on Public..., Blythe Solar Power Project (09- AFC-6), Application for Right-of Way Grant to Construct and Operate, and...
76 FR 21345 - Environmental Impacts Statements;
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
...'Driscoll 1-866- 208-3372. EIS No. 20110112, Draft EIS, BLM, NM, HB In-Situ-Solution Mining Project.../08/2011 Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air Act, EPA... summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has included its...
77 FR 67362 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-09
.... 20120358, Draft Supplement, BOEM, 00, Gulf of Mexico Outer Continental Shelf (OCS) Oil and Gas Lease Sales...: Aaron O. Allen 805-585-2148. EIS No. 20120360, Final EIS, BLM, 00, PROGRAMMATIC--Allocation of Oil Shale and Tar Sands Resources on Lands Administered, Propose to Amend 10 Land Use Plans in Colorado, Utah...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... BLM will announce future meetings or hearings and any other public participation activities at least..., Attention--Eastern Interior Draft RMP/EIS, Bureau of Land Management, 1150 University Avenue, Fairbanks... interior Alaska and is divided into four geographic areas: The Fortymile, Steese, Upper Black River, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000.L51100000.GN0000.LVEMK10CW370-WYW... Recovery Uranium Project, Fremont and Natrona Counties, WY AGENCY: Bureau of Land Management, Interior... (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement (EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
...In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) has prepared a Draft Proposed California Desert Conservation Area (CDCA) Plan Amendment and a Draft Environmental Impact Statement (EIS) for the Haiwee Geothermal Leasing Area (HGLA), Inyo County, California, and by this notice is announcing the opening of the comment period.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
... amended, the Bureau of Land Management (BLM) Mount Lewis Field Office, Battle Mountain, Nevada, intends to... Buffalo Valley Mine Project, a proposed open pit gold mine, mill, and associated facilities, located on..._mountain_field.html . In order to be considered during the preparation of the Draft EIS, all comments must...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... addressed in the Draft EIS, including Sentinel Plain. In response, the BLM completed its inventory for... 1610.5-2. Emailed and faxed protests will not be accepted as valid protests unless the protesting party.... Authority: 40 CFR 1506.6 and 1506.10, 43 CFR 1610.2 and 1610.5. Raymond Suazo, Arizona State Director. [FR...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-05
... the Proposed Gold Rock Mine Project, White Pine County, NV AGENCY: Bureau of Land Management, Interior... participation upon publication of the Draft EIS. ADDRESSES: You may submit comments related to the Gold Rock Mine Project by any of the following methods: Email: BLM_NV_EYDO_Midway_Gold_Rock[email protected] Fax: 775...
78 FR 35956 - Utah Resource Advisory Council Subgroup Conference Call
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... BLM-Utah's draft three-year National Conservation Lands Strategy. In May 2013, the RAC provided the BLM-Utah State Director with recommended changes to the draft strategy and this meeting was held to discuss how BLM-Utah has incorporated their recommendations into a revised draft strategy. A public...
75 FR 78992 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
...--Solar Energy Development in Six Southwestern States, To Establish a New BLM Solar Energy Program applicable to Utility-Scale Solar Energy Development and DOE's Proposed Action to Develop new Program... 01/20/2011. EIS No. 20100339, Final EIS, BLM, CA, Adoption--Genesis Solar Energy Project, Application...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 6 2014-07-01 2014-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 6 2012-07-01 2012-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
... Allocation of Oil Shale and Tar Sands Resources on Lands Administered by the Bureau of Land Management in... to prepare a Programmatic EIS for Allocation of Oil Shale and Tar Sands Resources on Lands... following methods: Web site: http://blm.gov/st5c . Mail: BLM Oil Shale and Tar Sands Resources Leasing...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-23
... Availability in the Federal Register. The BLM will announce future meetings or hearings and any other public... Revised Franchise Agreement from the County of San Bernardino. The BLM and San Bernardino County are...
10 CFR 501.65 - Publication of notice of availability of draft EIS.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Publication of notice of availability of draft EIS. 501.65... SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon...
10 CFR 501.65 - Publication of notice of availability of draft EIS.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Publication of notice of availability of draft EIS. 501.65... SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon...
10 CFR 501.65 - Publication of notice of availability of draft EIS.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Publication of notice of availability of draft EIS. 501.65... SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon...
10 CFR 501.65 - Publication of notice of availability of draft EIS.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Publication of notice of availability of draft EIS. 501.65... SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon...
77 FR 77076 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
...-557-5107. EIS No. 20120397, Final EIS, BLM, AK, National Petroleum Reserve-- Alaska (NPR-A) Integrated.... EIS No. 20120398, Final EIS, NPS, WI, Ice Age Complex at Cross Plains General Management Plan... Flood Risk in the Sutter Basin, Sutter and Butte Counties, CA, Comment Period Ends: 02/13/2013, Contact...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-02
... Management Plan (EIS/GMP) for Fort Raleigh National Historic Site, North Carolina. The draft describes and... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... project, a solar photovoltaic (PV) power plant facility, on approximately 115 acres of BLM-administered... Proposed Project to construct, operate, maintain, and decommission a 100-acre solar PV facility on BLM...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Draft Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
...The U.S. Department of Energy (DOE) announces the availability of the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS-0472D), for public comment. DOE is also announcing the dates, times, and locations for public hearings to receive comments on the Draft ULP PEIS. DOE has prepared the Draft ULP PEIS pursuant to the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality's (CEQ's) NEPA regulations (40 CFR parts 1500-1508), and DOE's NEPA implementing procedures (10 CFR part 1021) to analyze the reasonably foreseeable potential environmental impacts, including the site-specific impacts, of the range of reasonable alternatives for the management of the ULP. DOE's ULP administers 31 tracts of land covering an aggregate of approximately 25,000 acres (10,000 ha) in Mesa, Montrose, and San Miguel Counties in western Colorado for exploration, mine development, operations, and reclamation of uranium mines. The cooperating agencies on this ULP PEIS are the: U.S. Department of the Interior (DOI), Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado Department of Transportation; Colorado Division of Reclamation, Mining, and Safety; Colorado Parks and Wildlife ; Mesa County Commission; Montrose County Commission; San Juan County Commission; San Miguel County Board of Commissioners; Pueblo of Acoma Tribe; Pueblo de Cochiti Tribe; Pueblo de Isleta Tribe; Navajo Nation; and Southern Ute Indian Tribe.
Code of Federal Regulations, 2010 CFR
2010-01-01
... comments, as part of the administrative record (40 CFR 1505.1(c)). (d) If an EIS is required, DOE will normally publish the draft EIS at the time it publishes the proposed rule (40 CFR 1502.5(d)). DOE will... draft EIS under § 1021.313 of this part. The draft EIS need not accompany notices of inquiry or advance...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... Impact Statement (GMP/EIS) for Lincoln Home National Historic Site, Illinois. DATES: The draft GMP/EIS... meetings will be held during the 60-day review period on the GMP/EIS in Springfield, Illinois, in summer... the draft GMP/EIS are available from the Superintendent, 413 South Eighth Street, Springfield...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
...: The Abbreviated Final General Management Plan and Environmental Impact Statement (GMP/EIS) will remain... Site. SUPPLEMENTARY INFORMATION: We, the National Park Service, prepared a draft GMP/EIS for the park... summaries of the draft GMP/EIS. In addition to the distribution, the draft GMP/EIS was also made available...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-20
... Resource Area, CO AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In... any of the following methods: Email: BLM_CO[email protected] . Fax: 719-655-2502. Mail: BLM--Blanca Wetlands RMPA/EA, 46525 State Highway 114, Saguache, CO 81149. Copies of the draft RMPA and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-27
..., BLM Project Manager, Palm Springs South Coast Field Office, Bureau of Land Management, 1201 Bird... accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, and the Federal Land Policy... Commission (CEC), and the Bureau of Land Management (BLM), have prepared a Draft Environmental Impact...
7 CFR 1794.72 - Adoption of an EIS.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE (CONTINUED) ENVIRONMENTAL POLICIES AND PROCEDURES Adoption of Environmental Documents § 1794.72... portion of the EIS as a part of its draft EIS. The circulation and notice provisions for a draft and final... agency's EIS is adequate, RUS shall adopt that agency's EIS as its final EIS. RUS and the applicant shall...
76 FR 28029 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... 210- 424-8346. EIS No. 20110143, Final EIS, BLM, CA, Palen Solar Power Plant Project, Construction, Operation and Decommission a Solar Thermal Facility on Public Lands, Approval for Right-of-Way Grant...
75 FR 63469 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
...: Sandra Stiles, 504-862-1583. EIS No. 20100407, Final EIS, BLM, NV, Amargosa Farm Road Solar Energy Project, Construction and Operation of Two Concentrated Solar Power Plant Facilties, Right-of-Way...
75 FR 55326 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-10
..., Contact: Kimberly Kler 360- 396-0927. EIS No. 20100365, Final EIS, BLM, NV, Silver State Solar Energy Project, Construction and Operation of a 400-megawatt Photovoltaic Solar Plant and Associated Facilities...
77 FR 44234 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... Castillo 509-843-1891. EIS No. 20120242, Final EIS, BLM, WY, Lost Creek In Situ Recovery Project, To... agencies to participate in its e-NEPA electronic EIS submission pilot. Participating agencies can fulfill... filing documents online and providing feedback on the process. To participate in the pilot, register at...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-28
... energy development on BLM-administered lands. The elements of the BLM's proposed Solar Energy Program.... Amendment of BLM land use plans in the six-state study area to adopt those elements of the new Solar Energy... development, the BLM also proposes a process that will accommodate responsible development outside of SEZs...
7 CFR 1794.72 - Adoption of an EIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Adoption of an EIS. 1794.72 Section 1794.72... Adoption of an EIS. (a) Where RUS determines that an existing Federal EIS requires additional information... portion of the EIS as a part of its draft EIS. The circulation and notice provisions for a draft and final...
77 FR 15750 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
...: Sharon Scott 406-449-5201. EIS No. 20120065, Final EIS, BLM, UT, Uinta Basin Natural Gas Development Project, To Develop Oil and Natural Gas Resources within the Monument Butte-Red Wash and West Tavaputs...
7 CFR 1794.62 - Supplemental EIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Supplemental EIS. 1794.62 Section 1794.62 Agriculture... Supplemental EIS. (a) A supplement to a draft or final EIS shall be prepared, circulated, and given notice by RUS and the applicant in the same manner (exclusive of scoping) as a draft and final EIS (see § 1794...
10 CFR 501.65 - Publication of notice of availability of draft EIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Publication of notice of availability of draft EIS. 501.65 Section 501.65 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS ADMINISTRATIVE PROCEDURES AND SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A...
75 FR 51458 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
..., Contact: Kristin Kerwin 720-356-1564. EIS No. 20100329, Final EIS, BLM, CA, Blythe Solar Power Project (09- AFC-6), Application for Right-of Way Grant to Construct and Operate, and Decommission a Solar Thermal...
78 FR 45190 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
...: David Libman 404-507-5701. EIS No. 20130220, Draft EIS, NPS, OH, Cuyahoga Valley National Park White.... 20130176, Draft EIS, APHIS, TX, Cattle Fever Tick Eradication Program--Tick Control Barrier, Comment Period...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Management Environmental Impact Statement for the Hanford Site, Richland, WA AGENCY: Department of Energy... Statement for the Hanford Site, Richland, Washington (Draft EIS, DOE/EIS-00391), made available for public... Draft EIS is also available through the Hanford Web site at: http://www.hanford.gov/orp . Issued in...
16 CFR 1021.9 - Public participation, notice, and comment.
Code of Federal Regulations, 2010 CFR
2010-01-01
...: (1) Promptly after a decision is made to prepare a draft EIS, a notice of intent to prepare the draft EIS shall be published in the CPSC Public Calendar and in the Federal Register. The notice shall state... draft EIS, a notice of its availability for comment should be published in the CPSC Public Calendar and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-08
... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic Riverways (Riverways) in Missouri. DATES: The Draft GMP/WS/EIS will remain available for public review and... U.S. Environmental Protection Agency. ADDRESSES: Copies of the Draft GMP/WS/EIS will be available to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Kremmling Field... Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM) has prepared a Draft Resource... alternatives for future [[Page 57760
78 FR 20883 - Tonto National Forest; Arizona; Salt River Allotments Vegetative Management EIS
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
...The Tonto National Forest hereby gives notice that it is extending the public comment period for the Salt River Allotments Vegetative Management Draft Environmental Impact Statement (Draft EIS), which was published in the Federal Register on February 22, 2013, (Volume 78, No. 36) originally for a 45-day comment period. Please see the Notice of Availability of the Draft EIS (78 FR 12310) for more detailed information related to the Salt River Allotments Vegetative Management Draft EIS. In response to requests for additional time, the Forest Service will extend the comment period from April 8, 2013, to May 8, 2013. Federal, State, tribal, and local governments and other interested parties are requested to comment on the Draft EIS. Comments will be accepted by email to [email protected] or by mail to Debbie Cress, Tonto National Forest, 2324 E. McDowell Rd., Phoenix, AZ 85006 (928) 595-2093 or faxed to (602) 225-5295.
78 FR 17662 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
..., Bell Island Geothermal Leases, Review Period Ends: 04/22/2013, Contact: Sarah Samuelson 907- 789-6274... 571-256-2783. EIS No. 20130067, Draft EIS, WAPA, ND, Wilton IV Wind Energy Center, Comment Period Ends...-9553. EIS No. 20130070, Draft EIS, WAPA, USFWS, 00, PROGRAMMATIC--Upper Great Plains Wind Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... infrastructure development, including siting wind turbines, access roads, underground collector lines, overhead... Wildlife Service Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS... Plains Wind Energy Draft Programmatic Environmental Impact Statement (Draft [[Page 17654
the agreement will be signed in February 2012. This final draft of the PA enhances the role of tribal governments, consulting parties, and the public in the BLM project review process. It discusses the role of jcordova@blm.gov. For all other questions regarding the PA, BLM's Preservation Officer Robin Hawks should
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
....HAG11-0127] Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact... Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Baker... conditions, and changes in resource management practices since the Baker RMP of 1989. The Draft RMP/EIS was...
77 FR 49792 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
....epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 08/06/2012 Through..., Comment Period Ends: 10/01/2012, Contact: Brian Hasselbach 406-441-3908. EIS No. 20120266, Draft EIS, USFS... Ends: 10/01/2012, Contact: Harold Dyer 719-852-6215. EIS No. 20120267, Draft EIS, USN, VA, Outdoor...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
...] Notice of Availability of the Draft Programmatic Environmental Impact Statement for Solar Energy... Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern... preferred method of commenting. Mail: Addressed to: Solar Energy Draft Programmatic EIS, Argonne National...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... Statement for the Proposed Ivanpah Solar Electric Generation System Project, San Bernardino County, CA... Notice of Availability of the Draft Ivanpah Solar Electric Generation System EIS and the Draft California... prepared a Supplemental Draft Environmental Impact Statement (EIS) for the Proposed Ivanpah Solar Electric...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... DEPARTMENT OF ENERGY [OE Docket No. PP-362] Notice of Availability for the Draft Environmental.... SUMMARY: The U.S. Department of Energy (DOE) announces the availability of the ``Draft Environmental... EIS. The Draft EIS evaluates the environmental impacts of DOE's proposed Federal action of issuing a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... the Draft Environmental Impact Statement for the Toledo Bend Hydroelectric Project On May 17, 2013, the Commission issued a Draft Environmental Impact Statement (draft EIS) for the Toledo Bend Hydroelectric Project No 2105-036 (Toledo Bend Project). The draft EIS documents the views of governmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
..., the Bureau of Land Management (BLM), Battle Mountain District, Mount Lewis Field Office, Battle Mountain, Nevada, intends to prepare a Supplemental Environmental Impact Statement (EIS) for the Cortez... Cortez Hills Expansion Project are available at the BLM Battle Mountain District Office, 50 Bastian Road...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
...: Regular Mail: BLM Director (210), Attention: Brenda Hudgens- Williams, P.O. Box 71383, Washington, DC 20024-1383. Overnight Mail: BLM Director (210), Attention: Brenda Hudgens- Williams, 20 M Street SE...; and visual resources. The Proposed Imperial Sand Dunes RAMP and CDCA Plan Amendment/Final EIS includes...
Phase 2 fuel efficiency standards for medium- and heavy-duty engines and vehicles : draft EIS.
DOT National Transportation Integrated Search
2015-06-01
This Draft Environmental Impact Statement (Draft EIS) analyzes the environmental impacts of fuel : efficiency standards and reasonable alternative standards for model years 2018 and beyond for medium- : and heavy- duty engines and vehicles that NHTSA...
75 FR 8936 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... Notices EIS No. 20090421, Draft EIS, NRC, WY, Moore Ranch In-Situ Uranium Recovery (ISR) Project, Proposal to Construct, Operate, Conduct Aquifer Restoration, and Decommission an In-Situ Recovery (ISR... No. 20090423, Draft EIS, NRC, WY, Nichols Ranch In-Situ Uranium Recovery (ISR) Project, Proposal to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... identified as having the highest conservation value to maintaining sustainable GRSG populations; include..., 2012. The BLM held four scoping open houses in January and February 2012. The BLM used public scoping...
75 FR 47591 - Environmental Impacts Statements; Notice Of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... Thomas 559-784-1500 ext. 1164. EIS No. 20100292, Final EIS, BLM, CA, Ivanpah Solar Electric Generating System (07-AFC-5) Project, Proposal to Construct a 400-m Megawatt Concentrated Solar Power Tower, Thermal... Generation Station (GGS) Project, Proposes to Modify its Interconnection Agreement, Basin Electric Power...
23 CFR 771.129 - Re-evaluations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... RELATED PROCEDURES § 771.129 Re-evaluations. (a) A written evaluation of the draft EIS shall be prepared by the applicant in cooperation with the Administration if an acceptable final EIS is not submitted to the Administration within three years from the date of the draft EIS circulation. The purpose of...
75 FR 6018 - Environmental Management Site-Specific Advisory Board, Hanford
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... in the Draft Tank Closure (TC) and Waste Management (WM) Environmental Impact Statement (EIS) Overview of the Draft TC and WM EIS findings by other stakeholder groups Discussion of HAB member comments on the TC and WM EIS Development of HAB advice principles Adjourn Public Participation: The meeting...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Transportation; Notice of Extension of Comment Period for the Draft Environmental Impact Statement for the SpaceX... Notice of Availability (NOA) for the FAA's Draft Environmental Impact Statement for the SpaceX Texas... regarding the Draft EIS to Ms. Stacey M. Zee, FAA Environmental Specialist, SpaceX EIS c/o Cardno TEC Inc...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-16
... Transmission Line Project Draft Environmental Impact Statement AGENCY: Department of Energy. ACTION: Extension... comment period for the Champlain Hudson Power Express Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0447). The Draft EIS evaluates the environmental impacts of DOE's proposed Federal action...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... review. The EIS was updated to address the comments received on the 2010 Draft EIS. We are considering... burrowing owl (Athene cunicularia hypugaea), tricolored blackbird (Agelaius tricolor), Mount Hamilton... received on the Draft EIR/ EIS and our responses to those comments. Following a 30-day review period, we...
76 FR 10583 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-25
... No. 20110048, Draft EIS, DOE, 00, Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste, Proposed Development, Operation, and Long-Term Management of a Disposal Facility... Period Ends: 03/28/2011, Contact: Cody Wheeler 816-389-3739. EIS No. 20110051, Draft EIS, USN, CA, Marine...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... sustainable GRSG populations; include breeding, late brood-rearing and winter concentration areas. Preliminary... ended on March 23, 2012. The BLM held six scoping open houses in January and February 2012. The BLM used...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-14
... amended, the Bureau of Land Management (BLM), Battle Mountain District, Mount Lewis Field Office, Battle Mountain, Nevada, has prepared a Final Supplemental Environmental Impact Statement (EIS) for the Cortez... Final Supplemental EIS are available for public inspection at the Battle Mountain District Office, 50...
Evaluation of EIS alternatives by the science integration team, volume I.
Thomas M. Quigley; Kristine M. Lee; Sylvia J. Arbelbide
1997-01-01
The Evaluation of EIS Alternatives by the Science Integration Team describes the outcomes, interactions, effects, and consequences likely to result from implementing seven different management strategies on Forest Service (FS) and Bureau of Land Management (BLM) administered lands within the Interior Columbia Basin and portions of the Klamath and Great Basins. Two...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... Final EIS NOA and use them to inform the Records of Decision. Those individuals wishing to submit... general information regarding the DOE NEPA process, contact Carol Borgstrom, Director, Office of NEPA... development. Through the Final Programmatic EIS, the BLM is considering replacing elements of its existing...
76 FR 7844 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
.... Rassbach 509-522-6290. Amended Notices EIS No. 20100444, Final EIS, BLM, NV, Tonopah Solar Energy Crescent Dunes Solar Energy Project, a 7,680-Acre Right-of-Way (ROW) on Public Lands to Construct a Concentrated Solar Thermal Power Plant Facility, Nye County, NV, Contact: Julie Ann Smith 202-586-7668. Revision to...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Notice of Intent, the lead agencies, in cooperation with the applicant (if not a lead agency), will begin... at the local level. (c) The draft EIS shall be prepared by the lead agencies, in cooperation with the applicant (if not a lead agency). The draft EIS shall evaluate all reasonable alternatives to the action and...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Notice of Intent, the lead agencies, in cooperation with the applicant (if not a lead agency), will begin... at the local level. (c) The draft EIS shall be prepared by the lead agencies, in cooperation with the applicant (if not a lead agency). The draft EIS shall evaluate all reasonable alternatives to the action and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-24
... be considered, all comments on the Draft EIS must be received by September 27, 2012. The DoN will... (DoN) is extending the public comment period for the Draft Environmental Impact Statement (EIS) for the Proposed Modernization and Expansion of Townsend Bombing Range (TBR), Georgia (GA) until September...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-16
... times and locations: 05 December 2011 Anchorage, AK Open House 4-6 p.m. Loussac Library........ Public... Draft EIS: The Draft EIS is available for review at the following public libraries and schools: a. Harold Kaveolook School, Kaktovik, AK b. Nuiqsut Trapper School, Nuiqsut, AK c. Tuzzy Consortium Library...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... to do so. During the first hour, the public may review information materials and speak informally... Elemental Mercury Environmental Impact Statement and Notice of Public Hearings AGENCY: Department of Energy...-0423D, ``Draft Mercury Storage EIS'' or ``Draft EIS'') for public review and comment during a public...
78 FR 54893 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
... make public its comments on EISs issued by other Federal agencies. EPA's comment letters on EISs are... Period Ends: 10/21/2013, Contact: Ken Corey 760-322-2070. EIS No. 20130257, Final EIS, BLM, NV... and Queens Counties, NY, Contact: Gary Kassof 212-668-7021. The U.S. Coast Guard has adopted the U.S...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-18
... Final EIS for the Leasing and Underground Mining of the Greens Hollow Federal Coal Lease Tract (UTU... Mining of the Greens Hollow Federal Coal Lease Tract UTU-84102. Supplemental analyses are required to... mining methods, with foreseeable access from existing adjacent leases. The Forest Service and BLM have...
10 CFR 1021.313 - Public review of environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) The public review and comment period on a DOE draft EIS shall be no less than 45 days (40 CFR 1506.10... the Federal Register. (b) DOE shall hold at least one public hearing on DOE draft EISs. Such public... draft EIS and include the location, date, and time of the public hearings. (c) DOE shall prepare a final...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued..., App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 6 2011-07-01 2011-07-01 false Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued..., App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... evaluation of relevant new species information and hydrological data. The ERTP Draft EIS will evaluate the... alternative and actual data collected since the May 2002 FEIS. The IOP was intended to be continued until the... agency in the preparation of the Draft EIS. The Corps is in close coordination with the FWS. The Corps...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-03
... of Availability of the Draft Environmental Impact Statement (Draft EIS) and Announcement of Public..., cultural, and socioeconomic effects of the proposed alternatives. DATES: Written comments on the Draft EIS will be accepted through March 22, 2010. A public information meeting will be held from 5 p.m. to 7 p.m...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-29
...-Cow Creek Hydroelectric Project (FERC Project No. 606-027). In addition to or in lieu of sending... comments on the Draft EIS. The time and location of this public meeting is as follows: Kilarc-Cow Creek... application for the Kilarc-Cow Creek Project. The Draft EIS was issued and publicly noticed on June 22, 2010...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... transmission system. Western is issuing this notice to inform the public and interested parties about Western's... scope, proposed action, alternatives, and issues to be addressed in the EIS. Solar Reserve has applied to the Bureau of Land Management (BLM), Yuma Field Office for a right-of-way grant for the proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-27
...; UTU-83067] Notice of Availability of Draft Environmental Impact Statement for the Sigurd to Red Butte..., as amended, the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement... Service; State of Utah; Millard, Sevier, Beaver, Iron, and Washington counties, Utah; and the cities of St...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
...] Notice of Intent To Prepare a Draft Environmental Impact Statement for a Proposed Land Exchange Between.... ACTION: Notice of intent. SUMMARY: In compliance with the National Environmental Policy Act of 1969 (NEPA... Land Management (BLM) Palm Springs-South Coast Field Office intends to prepare a Draft Environmental...
32 CFR 644.377 - Formal revocation of public land withdrawals and reservations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... domain, the BLM Land Office will transmit to the DE a draft of public land order (PLO) designed to formally revoke the order or reservation which withdrew or reserved the land. The DE will review the draft...
32 CFR 644.377 - Formal revocation of public land withdrawals and reservations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... domain, the BLM Land Office will transmit to the DE a draft of public land order (PLO) designed to formally revoke the order or reservation which withdrew or reserved the land. The DE will review the draft...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-26
...)--Areas identified as having the highest conservation value for maintaining sustainable GRSG populations... the Federal Register (76 FR 77008) and ended on March 23, 2012. The BLM held scoping open houses in...
77 FR 31355 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
...: https://cdx.epa.gov . EIS No. 20120157, Final EIS, FTA, GA, Tier 1--Atlanta Beltline City of Atlanta..., Review Period Ends: 06/ 25/2012, Contact: Brian Smart 404-865-5600. EIS No. 20120158, Draft EIS, USACE...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Draft Environmental Impact Statement (EIS), Initiate the Public Scoping Period and Host Public Scoping Meetings for the Great Lakes and Mississippi River Interbasin Study (``GLMRIS''); Correction, Clarification... international commerce, travel and local practices, ANS have been introduced throughout the Mississippi River...
75 FR 7479 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... EIS, BLM, CA Chevron Energy Solutions Lucerne Valley Solar Project, Proposing To Develop a 45-megawatt (MW) Solar Photovoltaic (PV) Plant and Associated Facilities on 516 Acres of Federal Land Managed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-07
... involve the construction, operation, and maintenance of infrastructure upgrades, expansions, and... Road over the Santa Margarita River (Stuart Mesa Bridge). A Notice of Intent to prepare this EIS was... Road, Fallbrook, California 92028. A copy of the Draft EIS will be made available upon written request...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... Statement (EIS) for the General Management Plan (GMP) for Fort Matanzas National Monument (Monument... EIS/GMP describes the NPS preferred alternative--Alternative B--to guide the management of the... prescriptions to ensure protection, access and enjoyment of the Monument's resources. An up-to-date GMP is...
78 FR 43225 - Utah Resource Advisory Council Meeting/Conference Call
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-19
... Utah RAC formed a subgroup to review BLM-Utah's draft three-year National Conservation Lands Strategy... draft strategy and this meeting will be held to discuss the changes. A public comment period will take place immediately following the presentation. The meeting is open to the public; however, transportation...
33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS
Code of Federal Regulations, 2010 CFR
2010-07-01
... Draft EIS C Appendix C to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. C Appendix C to Part 230... commanders: Department of Defense Corps of Engineer, Department of the Army, 3710-XX (Use Local Billing Code...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... Environmental Impact Statement for the North Branch Ecorse Creek, Flood Risk Management General Reevaluation... Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement (EIS) for flood risk management... flood risk management measures. The GRR/EIS is being completed in partnership with Wayne County, MI. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... Environmental Impact Statement for the Mount Hope Project, Eureka County, NV AGENCY: Bureau of Land Management... Impact Statement (EIS) for the Mount Hope Project and by this notice is announcing the opening of the... Mount Hope Project Draft EIS within 90 days following the date the Environmental Protection Agency...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989, App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989, App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... Aurora, Colorado (southeast Denver metropolitan area). The remediation actions will be identified through... options may include federal actions which will be the subject of the EIS. 2. Remediation Alternatives. The draft EIS will address an array of remediation alternatives that could reduce the risk of life loss...
77 FR 47839 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-10
... electronic reporting site-- https://cdx.epa.gov/epa_home.asp EIS No. 20120257, Final EIS, BR, CA, San Joaquin... No. 20120262, Draft EIS, BR, CA, San Luis Reservoir State Recreation Area Resource Management Plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-03
...). The original notice published in the Federal Register on March 26, 2010 [75 FR 14623] provided for a comment period ending on June 24, 2010. The BLM is re-opening the comment period to end on August 9, 2010... to be received through June 24, 2010. The BLM is re-opening the comment period to accommodate...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [OR-65891, LLORB00000-L51010000-GN0000... Mine Expansion Project in Harney and Malheur Counties, OR AGENCY: Bureau of Land Management, Interior..., as amended (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the... alternative) seeks to allocate limited resources among competing human interests, land uses, and conservation...
77 FR 60986 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
.../2012, Contact: Liana Liu 360-753-9553. EIS No. 20120312, Final EIS, USFS, NV, Geothermal Leasing on the Humboldt-Toiyabe National Forest, To Facilitate the Development and Production of Geothermal Energy, Ely..., Contact: Jerald Weaver 360-378-2223. EIS No. 20120314, Draft EIS, WAPA, WY, Hermosa West Wind Energy...
33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS
Code of Federal Regulations, 2011 CFR
2011-07-01
... Draft EIS C Appendix C to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. C Appendix C to Part 230... copies sent forward must be signed in ink. A xerox copy of the signature is not allowed. c. A six-digit...
33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS
Code of Federal Regulations, 2013 CFR
2013-07-01
... Draft EIS C Appendix C to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. C Appendix C to Part 230... copies sent forward must be signed in ink. A xerox copy of the signature is not allowed. c. A six-digit...
33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS
Code of Federal Regulations, 2012 CFR
2012-07-01
... Draft EIS C Appendix C to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. C Appendix C to Part 230... copies sent forward must be signed in ink. A xerox copy of the signature is not allowed. c. A six-digit...
78 FR 53754 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... Everglades Planning Project, Comment Period Ends: 10/15/2013, Contact: Gretchen Ehlinger 904 232-1682. EIS No. 20130251, Final EIS, USFS, MN, BWCAW Non-native Invasive Plant Management Project, Review Period Ends: 10... Project, Comment Period Ends: 10/15/2013, Contact: Pete Gomben 801-999-2182. EIS No. 20130255, Draft EIS...
7 CFR 1940.323 - Preparing supplements to EIS's.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Preparing supplements to EIS's. 1940.323 Section 1940... EIS's. (a) Either the State Office or the National Office, as appropriate, will prepare supplements to either draft or final EIS's if: (1) A substantial change or changes occur in the proposed action and such...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-19
...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) has prepared a Final Environmental Impact Statement (EIS) for the proposed Sun Valley to Morgan 500/230-kilovolt (kV) Transmission Line Project (Project) and Proposed Bradshaw-Harquahala Resource Management Plan (RMP) Amendment for the BLM Hassayampa Field Office, and by this notice is announcing its availability.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
...-FF08ECAR00] Draft Supplemental Environmental Impact Report/Environmental Impact Statement for a Proposed... Conservation Commission (CVCC), has prepared a joint draft Supplemental Environmental Impact Report/Environmental Impact Statement (draft Supplemental EIR/EIS) under the National Environmental Policy Act (NEPA...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
..., regulations, and policies and the purpose of the Cumberland Gap National Historical Park, the Final GMP/EIS... prescriptions to ensure protection, access and enjoyment of the park's resources. The Final GMP/EIS describes... Final GMP/EIS contains NPS responses to public comments on the Draft GMP/EIS, and copies of agency...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-23
... DEPARTMENT OF ENERGY Extension of the Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement AGENCY: Department of Energy. ACTION: Extension of the public... the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS...
Code of Federal Regulations, 2010 CFR
2010-07-01
... limited to factual corrections and responses to comments, the proponent and EPF may, with the prior..., the EPF must submit the Draft EIS and all of the above documents, with a new cover sheet indicating... more extensive modifications are required, the EPF must prepare a preliminary final EIS incorporating...
75 FR 19969 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
.... 20100121, Draft EIS, DOI, CA, Stanford University Habitat Conservation Plan, Authorization for Incidental... Corridor, Propose to Construct Roadway Improvements from Farm-to-Market (FM) 2920 to Interstate Highway (IH... Mott, 512- 536-5964. EIS No. 20100124, Final EIS, NPS, CA, Prisoners Harbor Coastal Wetland Restoration...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... DEPARTMENT OF ENERGY Re-Opening of the Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement AGENCY: Department of Energy. ACTION: Re-opening of the public... the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS...
77 FR 23713 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
...-7104. EIS No. 20120109, Draft EIS, FHWA, OR, Salem River Crossing Project, Proposes to Build a Modified.... 20120110, Final EIS, USFWS, CA, Sears Point Wetland and Watershed Restoration Project, To Restore Tidal Wetlands and Rehabilitate Diked Wetlands, Sonoma County, CA, Review Period Ends: 05/ 21/2012, Contact: Don...
77 FR 42727 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
...: https://cdx.epa.gov . EIS No. 20120230, Draft EIS, USACE, CA, Sierra Vista Specific Plan Development... No. 20120232, Final EIS, RUS, MN, Hampton--Rochester--La Crosse Transmission System Improvement... Hampton, MN and La Crosse, WI, Review Period Ends: 08/20/2012, Contact: Stephanie A. Strength 202-720-0820...
77 FR 59611 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-28
...: Sandy Hurlocker 505-753-7331. EIS No. 20120308, Draft EIS (Tiering), NASA, AK, Sounding Rocket Program (SRP) at Poker Flat Research Range (PFRR), Continuing Sounding Rocket Launches, Alaska, Comment Period...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...
75 FR 58376 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... Seastrand 626-574-5278. EIS No. 20100378, Draft Supplement, USFS, OR, North Fork Burnt River Mining Project.... 20100380, Final EIS, USACE, 00, Sabine-Neches Waterway Channel Improvement Project, Proposed Ocean Dredged...
75 FR 72823 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-26
... Register. EIS No. 20100449, Draft EIS, USFS, MT, Stillwater Mining Revised Water Management Plans and BOE... and Reuse, Implementation, Brunswick, ME, Wait Period Ends: 12/27/2010, Contact: Thomas Stephan 215...
75 FR 22778 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
...-4711. EIS No. 20100147, Draft EIS, NPS, FL, PROGRAMMATIC--Coral Reef Restoration Plan, Implementation..., Proposes to Salvage Dead and Dying Trees, Treat Excess Fuels, and Plant Trees, Kern River Ranger District...
78 FR 57849 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... State Solar South Project Proposed Resource Management Plan Amendment, Review Period Ends: 10/21/2013, Contact: Nancy Christ 702-515-5136. Amended Notices EIS No. 20130227, Draft EIS, NASA, CA, Proposed...
DUF6 Draft EIS Public Hearing Transcripts
and Uses DUF6 Conversion EIS Documents News FAQs Internet Resources Glossary Home » Conversion Facility EISs | Documents News | FAQs | Internet Resources | Glossary Help | Mailing Services | Contact Us
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... draft CCP and draft EIS'' in the subject line of the message. Fax: Attn: Sharon Seim, Planning Team Leader, (907) 456-0428. U.S. Mail: Sharon Seim, Planning Team Leader, Arctic National Wildlife Refuge... CONTACT: Sharon Seim, Planning Team Leader, at the address listed above, by phone at (907) 456-0501, or by...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-07
[email protected]gov Include ``Comment to T.F. Green Draft Written Re-Evaluation'' in the subject line Mail... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Draft Written Re-Evaluation for... notice to advise the public that a Draft Written Re-Evaluation for an Environmental Impact Statement (EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... U.S. Postal Service to Naval Facilities Engineering Command Pacific, Attention: MITT EIS/OEIS... project Web site ( www.MITT-EIS.com ). All comments, oral or written, submitted during the public review... Facilities Engineering Command Pacific, Attention: MITT EIS/OEIS Project Manager, 258 Makalapa Drive, Suite...
24 CFR 58.52 - Adoption of other agencies' EISs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... entity adopts an EIS prepared by another agency, the procedure in 40 CFR 1506.3 shall be followed. An adopted EIS may have to be revised and modified to adapt it to the particular environmental conditions and... other agencies' EISs. The responsible entity may adopt a draft or final EIS prepared by another agency...
23 CFR 771.127 - Record of decision.
Code of Federal Regulations, 2010 CFR
2010-04-01
... a ROD no sooner than 30 days after publication of the final EIS notice in the Federal Register or 90 days after publication of a notice for the draft EIS, whichever is later. The ROD will present the... identified as the preferred alternative but was fully evaluated in the final EIS, or proposes to make...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-30
... Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to...
78 FR 56695 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... National Forest Oil and Gas Leasing Analysis Project, Review Period Ends: 10/21/2013, Contact: Rob Hamilton 435-896-1022 EIS No. 20130266, Draft EIS, USN, GU, The Mariana Islands Training and Testing, Comment...
75 FR 65320 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
... Eight Allotments, Black Hills National Forest, Pennington and Custer Counties, SD, Wait Period Ends: 11... necessary under Section 1506.3(b) of the CEQ Regulations. EIS No. 20100416, Draft EIS, WAPA, CA, Rice Solar...
76 FR 59125 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
.... Markham 805-585-2150. EIS No. 20110317, Draft EIS, USFS, MT, Lonesome Wood Vegetation Management 2 Project... the 2006 FEIS Analysis and to Correct the Deficiencies that the Meister Panel Identified, Land and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-19
... Draft Feasibility Study; Environmental Impact Statement for the Chatfield Reservoir Storage Reallocation.... Army Corps of Engineers has prepared a Draft Feasibility Report/Environmental Impact Statement (FR/EIS) for the Chatfield Reservoir Storage Reallocation Study, Littleton, Colorado and by this notice is...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-08
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Environmental Impact Statement..., Sacramento County, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability and public.... The preliminary design concepts being considered in the Draft EIS/EIR are one three-story building or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge National River, West..., and interpretation of park resources over the next 20 years. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets...
75 FR 76981 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-10
..., Contact: Cesar Perez 916-498-5065. EIS No. 20100459, Draft EIS, BPA, 00, Big Eddy-Knight Transmission... using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat...
77 FR 40036 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-06
... Ends: 10/03/2012, Contact: Angel Martinez 505-761-8918. EIS No. 20120213, Draft EIS, FRA, IL, Chicago... and Eastern Gulf of Mexico, Cook Inlet, the Beaufort Sea, and the Chukchi Sea, Review Period Ends: 08...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-31
...The Bureau of Reclamation and the San Joaquin River Exchange Contractors Water Authority have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for a 25-Year Water Transfer Program, 2014-2038. The proposed new program would provide for the transfer and/or exchange of up to 150,000 acre-feet of substitute water from the San Joaquin River Exchange Contractors Water Authority to several potential users over a 25-year timeframe (water service years 2014-2038). A Notice of Availability of the joint Draft EIS/EIR was published in the Federal Register on Friday, May 4, 2012 (77 FR 26578). The written comment period on the Draft EIS/EIR ended Tuesday, July 3, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and additional information received during the review period.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-18
... proposed wind energy projects in eagle habitat, BLM wildlands policy, geothermal program review, Salt Wells Energy Projects Draft Environmental Impact Statement, field tour of ENEL Geothermal Power Plant at Salt...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE
2005-12-01
The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not tomore » reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.« less
76 FR 20715 - National Environmental Policy Act; Sounding Rockets Program; Poker Flat Research Range
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
...), and NASA's NEPA policy and procedures (14 CFR part 1216, subpart 1216.3), NASA intends to prepare an... to apprise interested agencies, organizations, tribal governments, and individuals of NASA's intent... significant environmental issues to be evaluated in the EIS. In cooperation with BLM, UAF, and USFWS, NASA...
78 FR 79005 - Notice of Filing of Plats of Survey; North Dakota
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLMT926000-L13100000-EI0000] Notice of Filing of Plats of Survey; North Dakota AGENCY: Bureau of Land Management, Interior. ACTION: Notice of filing of plats of survey. SUMMARY: The Bureau of Land Management (BLM) will file the plat of survey of...
77 FR 5513 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-03
... EIS, BLM, NM, HB In-Situ Solution Mining Project, Proposal to Extract the Potash Remaining in Inactive... Use Plans in Colorado, Utah, and Wyoming, Comment Period Ends: 05/02/2012, Contact: Sherri Thompson... Truck Highway 14 from Front Street in New Ulm to Nicollet County Road 6 in North Mankato, Funding, USACE...
78 FR 76176 - Notice of Filing of Plats of Survey; North Dakota
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-16
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLMT926000-L13100000-EI0000] Notice of Filing of Plats of Survey; North Dakota AGENCY: Bureau of Land Management, Interior. ACTION: Notice of filing of plats of survey. SUMMARY: The Bureau of Land Management (BLM) will file the plat of survey of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Notice of Availability for the Draft Environmental Impact Statement for the Gregory Canyon Landfill Project, San Diego County, CA... Draft Environmental Impact Statement (EIS) for the proposed Gregory Canyon Landfill Project in San Diego...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-11
... DEPARTMENT OF DEFENSE Department of the Navy Reopening of Public Comment Period for the Draft Environmental Impact Statement/Legislative Environmental Impact Statement for Renewal of Naval Air Weapons... Weapons Station China Lake public land withdrawal. A Notice of Availability for the Draft EIS/LEIS was...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended, and the... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-07
... Availability of the Draft Environmental Impact Statement for the Continental Divide-Creston Natural Gas... Continental Divide-Creston Natural Gas Development Project, and by this notice is announcing the opening of... comments on the Continental Divide-Creston Natural Gas Development Project Draft EIS within 45 days...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
... Transmission Company; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Apex...) has prepared a draft environmental impact statement (EIS) for the Apex Expansion Project proposed by... the proposed project would have some adverse environmental impact; however, these impacts would be...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
... Impact Statement, Including a Draft Programmatic Agreement, for the Clark, Lincoln, and White Pine...), which is included as an Appendix to the EIS, for the Southern Nevada Water Authority's (SNWA) Clark...--Central Nevada Regional Water Authority, White Pine, Lincoln, and Clark counties (NV); and Juab, Millard...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... announcing the dates, times and locations for public hearings to receive comments on the Draft SPD... additional options for pit disassembly and conversion, which entails processing plutonium metal components to... practicable. DOE will hold public hearings on the Draft SPD Supplemental EIS; the dates, times and locations...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
...; MO 4500051040; TAS: 14X5017] Notice of Availability of the Draft Supplemental Environmental Impact... Availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and...) has prepared a Draft Supplemental Environmental Impact Statement (EIS) for the Ruby Pipeline Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-25
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... Impact Statement (draft EIS) for the Martin Dam Hydroelectric Project No. 349- 173 (Martin Dam Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
...EPA and NHTSA are announcing public hearings to be held for the joint proposed rules ``2017 and Later Model Year Light-Duty Vehicle Greenhouse Gas Emissions and Corporate Average Fuel Economy Standards,'' published in the Federal Register on December 1, 2011. The agencies will also accept comment on NHTSA's Draft Environmental Impact Statement (Draft EIS), available on NHTSA's Web site at http:// www.nhtsa.gov/fuel-economy. Three hearings will be held, on January 17, January 19, and January 24, 2012. The agencies will assume that all oral comments presented at the hearing are addressed to the joint proposed rules only, unless speakers specifically reference NHTSA's Draft EIS in oral or written testimony.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
...)--Areas identified as having the highest conservation value to maintaining sustainable GRSG populations... FR 77008), and ended on March 23, 2012. The BLM held one scoping open house in North Dakota in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
... Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska AGENCY: Bureau of Land.../Draft Environmental Impact Statement (EIS) for the Ring of Fire RMP for the Haines Planning Area and by... Fire RMP-- Haines Planning Area Amendment by any of the following methods: Email: [email protected
77 FR 4318 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
..., Clearwater National Forest Travel Planning Project, Proposes to Manage Motorized and Mechanized Travel.../2012, Contact: Heather Berg (208) 476-4541. EIS No. 20120014, Revised Draft EIS, USFS, MT, East Deer Lodge Valley Landscape Restoration Management Project, To Conduct Landscape Restoration Management...
76 FR 78252 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
..., Rubicon Trail Easement and Resource Improvement Project, Construction and Operation, Right-of-Way Grant...: Andrea Catanzaro (409) 766-6346 EIS No. 20110421, Draft EIS, USFS, CA, Greys Mountain Ecological...--La Crosse Transmission System Improvement Project, Proposed Construction and Operation of a 345...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-21
... consumption. Sub-alternative Al would use PV technology instead of solar thermal technology to reduce water...; AZA34187] Notice of Availability of the Final Environmental Impact Statement for the Proposed Sonoran Solar... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Sonoran Solar Energy Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-05
... uses, livestock grazing, potash production, and oil and gas development. Interest in oil, gas, and... currently identified by a BLM interdisciplinary team include the following: air quality and climate change... single environmental impact statement (EIS) to consider leasing for oil and gas and potash on about 783...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
...; UTU-83067] Notice of Availability of Final Environmental Impact Statement for the Sigurd to Red Butte... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Sigurd to Red Butte No. 2--345...; Utah School and Institutional Trust Lands Administration; Millard, Sevier, Beaver, Iron, and Washington...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-30
... Treatments Using Herbicides on Bureau of Land Management Lands in Oregon AGENCY: Bureau of Land Management... Impact Statement (EIS) for Vegetation Treatments Using Herbicides on Bureau of Land Management lands in... herbicides currently in use on BLM- managed lands in Oregon and increase the number of objectives for which...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-24
... National Grassland, Wyoming; Teckla-Osage-Rapid City Transmission 230 kV Project AGENCY: Forest Service... (BHP) to construct and operate a 230 kilovolt (kV) transmission line between the Teckla and Osage... Management (BLM) is a cooperating agency on this EIS. The Teckla-Osage-Rapid City Transmission 230 kV Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... (EIS) for the Chevron Energy Solutions/Solar Millennium (CESSM), LLC's Blythe Solar Power Plant (BSPP... project and amend the CDCA Plan to prohibit solar energy projects on the project site. The BLM will take..., LVRWB09B2600] Notice of Availability of the Final Environmental Impact Statement for the Chevron Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
...-166318] Notice of Availability of the Final Environmental Impact Statement for the Lost Creek Uranium In Situ Recovery Project in Sweetwater County, WY AGENCY: Bureau of Land Management, Interior. ACTION... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Lost Creek Uranium In Situ...
78 FR 16500 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... and Vegetation Management Project, Comment Period Ends: 04/29/2013, Contact: Marcy Anderson 541-419-0517. EIS No. 20130062, Draft EIS, USFS, NM, Roca Honda Mine Project, Exploration and Mine Development... Seco Riparian Sanctuary Unit Restoration and Pumping Plant/Fish Screen Facility Protection Project...
76 FR 75543 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... Profile Zones (DFPZs), Lassen National Forest, Almanor Ranger District, Plumas County, CA, Comment Period... Treatment Activities, Updated and New Information, Idaho Panhandle National Forests, Priest Lake Ranger... (937) 257-5899. EIS No. 20110403, Draft EIS, USFS, CA, Creeks II Forest Restoration Project, Proposal...
77 FR 37672 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... EIS, NOAA, AS, Fagatele Bay National Marine Sanctuary Management Plan, Implementation, Tutuila Island.... 20120195, Draft EIS, NPS, FL, Fort Matanzas National Monument General Management Plan, Implementation, St... filing documents online and providing feedback on the process. To participate in the pilot, register at...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... following Web site: http://www.blm.gov/nv/st/en/fo/battle_mountain_field.html . FOR FURTHER INFORMATION... criteria pollutant and ``Dark Sky'' attributes on the effects of the viewshed, and the availability of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-08
... Habitat (PPH)--Areas identified as having the highest conservation value to maintaining sustainable GRSG... Federal Register to extend the scoping period until March 19, 2012. The BLM held a scoping open house on...
Code of Federal Regulations, 2010 CFR
2010-07-01
... chance to speak, when the hearing has culled a representative view of public opinion, or when the time... 32 National Defense 6 2010-07-01 2010-07-01 false Procedures for Holding Public Hearings on Draft..., App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
76 FR 34072 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
.... 20110178, Draft EIS, NRC, FL, Generic--License Renewal of Nuclear Plants Regarding Crystal River Unit 3.... 20110182, Final EIS, WAPA, CA, Rice Solar Energy Project, Proposed 150 megawatt Solar Energy Generating..., Access, Wildlife, Fisheries, Soil and Water, Idaho Panhandle National Forest, St. Joe Ranger District...
77 FR 41402 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-13
... Listed or Petitioned Species, Several Counties, Texas, Comment Period Ends: 10/10/2012, Contact: Adam Zerrenner 512-490-0057. EIS No. 20120224, Draft EIS, FHWA, IL, Illiana Corridor Project Tier One... Mountain Restoration Project, Kaibab National Forest, Coconino County, AZ, Comment Period Ends: 08/27/2012...
Code of Federal Regulations, 2010 CFR
2010-07-01
... summary to the public with an attached list of locations (such as public libraries) where the entire draft... a proposed action will potentially have disproportionately high and adverse human health or... as when there has been a significant change in circumstances, development of significant new...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-12
... Washakie Counties, and most of Hot Springs County in north-central Wyoming. The Planning Area includes all... listed in the ADDRESSES section above. In order to reduce the use of paper and control costs, the BLM...
77 FR 27771 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... Forest, Custer, Fall River, Lawrence, Meade, and Pennington Counties, SD and Crook and Weston Counties... Improvements Project, Special Use Permit, White River National Forest, Eagle County, CO, Review Period Ends: 06/11/2012, Contact: Don Dressler 970-827-5157. EIS No. 20120142, Draft EIS, USN, 00, Atlantic Fleet...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-26
... Impact Statement/ Environmental Impact Statement, Upper Truckee River and Marsh Restoration Project, El... Statement (EIR/EIS/EIS) for the Upper Truckee River Restoration and Marsh Restoration Project (Project). The... prepare email comments for the Project. The public hearings will be held at 128 Market Street, Stateline...
77 FR 9652 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... Road-Related Impacts to Wildlife, Fish, Soil, and Water Resources and Restoration of 2010 Forest Plan..., Amendment 18A to the Fishery Management Plan for the Snapper-Grouper Fishery of the South Atlantic Region...-9235. EIS No. 20120034, Draft EIS, USFS, CA, Harris Vegetation Management Project, To Improve Forest...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
... to 100 1.5 megawatt (MW) to 3 MW wind turbine generators with a nameplate capacity of 250 MW of power... Intent to Prepare an Environmental Impact Statement for the Quaking Aspen Wind Energy Project, Wyoming... Statement (EIS) for the Quaking Aspen Wind Energy Project (Quaking Aspen). By this notice, BLM is: (1...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-20
... Statement for the NextLight Renewable Power, LLC, Silver State Solar Project, Clark County, NV AGENCY... Statement (EIS) for the Silver State Solar Project, Clark County, Nevada, and by this notice is announcing its availability. DATES: The BLM will not issue a final decision on the Silver State Solar Project for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
.... The purpose of this notice is to inform the public of the availability of the draft EA for review and... Impact Statement (EIS) would need to be prepared. The draft EA can be accessed online at: http://www...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... . Email: BLM_OR_EU[email protected] . Fax: 541-683-6981. Mail: P.O. Box 10226, Eugene, Oregon 97440-2226..._OR_EU[email protected] . Persons who use a telecommunications device for the deaf (TDD) may call the...
Draft Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1995-01-01
The Draft Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA's participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop a human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-15
... Facilities Engineering Command Northwest, 1101 Tautog Circle Suite 203, Silverdale, Washington, 98315-1101... Burt, NWSTF Boardman EIS Project Manager, 1101 Tautog Circle Suite 203, Silverdale, Washington, 98315-1101. In addition, comments may be submitted online at http://www.NWSTFBoardmanEIS.com during the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
... quality of the environmental decision making. The public includes affected and interested Federal, state... EIS for the LCA Ecosystem Restoration Study, November 2004. The record of decision for the... Ecosystem Restoration Study, November 2004. The record of decision for the programmatic EIS was signed on...
Code of Federal Regulations, 2011 CFR
2011-01-01
... EPA notice of a NASA draft EIS. (2) Thirty days after publication of an EPA notice of a NASA final EIS. (b) When necessary to comply with other specific statutory requirements, NASA shall consult with and... the proposed action (the major decision point of § 1216.304(b)) shall be made by NASA until the later...
Code of Federal Regulations, 2010 CFR
2010-01-01
... EPA notice of a NASA draft EIS. (2) Thirty days after publication of an EPA notice of a NASA final EIS. (b) When necessary to comply with other specific statutory requirements, NASA shall consult with and... the proposed action (the major decision point of § 1216.304(b)) shall be made by NASA until the later...
Code of Federal Regulations, 2012 CFR
2012-01-01
... EPA notice of a NASA draft EIS. (2) Thirty days after publication of an EPA notice of a NASA final EIS. (b) When necessary to comply with other specific statutory requirements, NASA shall consult with and... the proposed action (the major decision point of § 1216.304(b)) shall be made by NASA until the later...
75 FR 14594 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-26
... Forest, Mono County, CA and Lyon, Douglas, and Mineral Counties, NV, Wait Period Ends: 04/26/2010.../ 2010, Contact: Douglas Gober, 208-476-4541. EIS No. 20100089, Draft EIS, STB, AK, Port MacKenzie Rail..., Richland, Benton County, WA, Comment Period Ends: 05/03/2010, Contact: Mary Beth Burandi, 888-829- 6347...
76 FR 18151 - Kootenai National Forest, Lincoln County, MT; Miller West Fisher Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... proposed action, the Draft EIS and the Final EIS, and the Forest Service is not inviting comments at this...: Contact Leslie McDougall, Team Leader, Three Rivers Ranger District, at (406) 295-4693. SUPPLEMENTARY...; implementation of best management practices (BMPs) and road maintenance work will be applied to approximately 38...
75 FR 60477 - Notice of Public Meetings, Twin Falls District Resource Advisory Council, Idaho
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... of Public Meetings, Twin Falls District Resource Advisory Council, Idaho AGENCY: Bureau of Land... (BLM) Twin Falls District Resource Advisory Council (RAC) subcommittee for the Jarbidge Draft Resource...; and December 1, 2010. The Twin Falls District RAC subcommittee members will meet at the Loong Hing...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-09
...] Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for Incidental... future incidental take applications. The take would affect the federally endangered Alabama beach mouse... GCP and the dEIS. These documents analyze the take of the Alabama beach mouse incidental to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
... Register (65 FR 78464) to prepare an environmental impact statement (EIS) for controlling invasive plants... of completion and distribution for the draft supplemental environmental impact statement (DSEIS) as... the final supplemental environmental impact statement (FSEIS) and draft records of decision (each...
78 FR 19261 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-29
... No. 20130073, Draft Supplement, NRC, WY Ross In-Situ Leach Recovery (ISR) Project, Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities, Comment Period Ends... project. EIS No. 20130075, Draft Supplement, NMFS, AK, Effects of Oil and Gas Activities in the Arctic...
76 FR 49526 - Environmental Impact Statement; Saint Louis County, MN
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... environmental impacts of alternatives, including (1) No-build, (2) Purchasing title and possession of the.... The Scoping Document/Draft Scoping Decision Document is anticipated to be published in late 2011. A... Decision Document will be published after the public comment period has closed. A Draft EIS will be...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-13
...EPA and NHTSA are announcing a 14-day extension of the comment period for the joint proposed rules ``2017 and Later Model Year Light- Duty Vehicle Greenhouse Gas Emissions and Corporate Average Fuel Economy Standards,'' published in the Federal Register on December 1, 2011 (76 FR 74854). The comment period was to end on January 30, 2012 (60 days after publication of the proposals in the Federal Register). This document extends the comment period to February 13, 2012. This extension of the comment period is provided to allow the public additional time to comment on the proposed rule. The extension of the comment period does not apply to NHTSA's Draft Environmental Impact Statement (Draft EIS), available on NHTSA's Web site at www.nhtsa.gov/fuel-economy. The comment period for NHTSA's Draft EIS closes on January 31, 2012.
X-33 Environmental Impact Statement: A Fast Track Approach
NASA Technical Reports Server (NTRS)
McCaleb, Rebecca C.; Holland, Donna L.
1998-01-01
NASA is required by the National Environmental Policy Act (NEPA) to prepare an appropriate level environmental analysis for its major projects. Development of the X-33 Technology Demonstrator and its associated flight test program required an environmental impact statement (EIS) under the NEPA. The EIS process is consists of four parts: the "Notice of Intent" to prepare an EIS and scoping; the draft EIS which is distributed for review and comment; the final ETS; and the "Record of Decision." Completion of this process normally takes from 2 - 3 years, depending on the complexity of the proposed action. Many of the agency's newest fast track, technology demonstration programs require NEPA documentation, but cannot sustain the lengthy time requirement between program concept development to implementation. Marshall Space Flight Center, in cooperation with Kennedy Space Center, accomplished the NEPA process for the X-33 Program in 13 months from Notice of Intent to Record of Decision. In addition, the environmental team implemented an extensive public involvement process, conducting a total of 23 public meetings for scoping and draft EIS comment along with numerous informal meetings with public officials, civic organizations, and Native American Indians. This paper will discuss the fast track approach used to successfully accomplish the NEPA process for X-33 on time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... Facilities Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30... Facilities Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30, Building 903, NAS Jacksonville, FL 32212 or electronically via the project Web site ( http://www.keywesteis...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... Statement (EIS) to evaluate the impacts of, and alternatives to, the proposed issuance of an Endangered... alternatives and issues to be addressed in the draft EIS must be received by close of business on June 3, 2010... gather the information necessary to determine impacts and alternatives to support a decision regarding...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... studies that are underway. 5. Scoping Process: The Corps and County Parks will jointly conduct a series of... development of the EIS/EIR and associated technical studies are being completed to determine the Agency... Association of Governments (SANDAG). The EIR/EIS is currently evaluating three alternative restoration designs...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-12
... Environmental Impact Statement for General Management Plan for Golden Gate National Recreation Area and Muir... Management Plan for Golden Gate National Recreation Area and Muir Woods National Monument. SUMMARY: In accord... Environmental Impact Statement (Draft EIS) for the updating the General Management Plan (GMP) for Golden Gate...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-14
... Lake Charles Carbon Capture and Sequestration Project (DOE/EIS-0464D) AGENCY: U.S. Department of Energy...) announces the availability of the Lake Charles Carbon Capture and Sequestration Project Draft [[Page 28206... potential environmental impacts associated with the Lake Charles Carbon Capture and Sequestration Project...
15 CFR 921.13 - Management plan and environmental impact statement development.
Code of Federal Regulations, 2011 CFR
2011-01-01
... submitted pursuant to § 921.12, the state may begin draft management plan development and the collection of information necessary for the preparation by NOAA of an EIS. The state shall develop a draft management plan... areas of the Reserve, ranking these areas according to their relative importance, and including a...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... Regional Water Supply Project, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... Alamogordo Regional Water Supply Project and by this notice is announcing the opening of the comment period... Alamogordo Regional Water Supply Project Draft EIS within 60 days following the date the Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-08
... ending March 19, 2010. The State of Washington, Department of Ecology (Ecology) is a cooperating agency.... For general questions and information about the Washington State Department of Ecology, contact... Ecology as a cooperating agency, prepared the Draft TC & WM EIS in accordance with the Council on...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
..., 474 megawatt (MW) wind energy project including 158 wind turbine generators, a substation... Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-23
... application for a ROW grant to construct, operate, maintain, and decommission a photovoltaic solar energy... Proposed Stateline Solar Farm, San Bernardino County, CA and Draft California Desert Conservation Area Land... Statement/Environmental Impact Report (EIS/EIR) for the Stateline Solar Farm Project (Stateline) and by this...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... Resource Management Plan and Environmental Impact Statement, Idaho AGENCY: Bureau of Land Management... Availability of the Draft Jarbidge Field Office Resource Management Plan (RMP) and Environmental Impact Statement (EIS) in the Federal Register on September 3, 2010 [75 FR 54177] and [[Page 74743
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-27
... Environmental Impact Statement for the Cottonwood Cove and Katherine Landing Development Concept Plans, Clark...) for the Cottonwood Cove and Katherine Landing Development Concept Plans, Lake Mead National Recreation... environment. DATES: The National Park Service will accept comments on the Draft EIS from the public for 60...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-29
... DEPARTMENT OF ENERGY Postponement of Public Hearing on the Draft Environmental Impact Statement for the Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, WV AGENCY: U.S... Carbon Capture and Storage Project (DOE/EIS-0445D) for public review and comment in a Federal Register...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-20
... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
... instrumentation to ensure adequate monitoring and to provide suitable baseline information. 2. Remediation Alternatives. The draft EIS will address an array of remediation alternatives that are necessary to prevent... benefits. The exact nature and extent of the remediation alternatives will be determined based on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... evaluation of the main dam's overall earthquake performance. 2. Remediation Alternatives. The draft EIS will address an array of remediation alternatives that are necessary to prevent loss of life, extensive... extent of the remediation alternatives will be determined based on the results of on- going geotechnical...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... preliminary general management areas (PGMA). PPMAs are BLM-administered public lands or National Forest System... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLUT1110000.L16100000.DS0000] Notice of... AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Availability. SUMMARY: In accordance with...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
...) solar photovoltaic (PV) facility and associated 220- kilovolt (kV) generation interconnection line (gen... solar PV facility on public lands in compliance with FLPMA, NEPA, BLM ROW and land use planning... Holdings, LLC Desert Sunlight Solar Farm Project and Possible California Desert Conservation Area Plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... Elementary School, 21419 West Dove Valley Road, Wittmann, Arizona 85361--December 12, 2012 BLM National... days in advance through public notices, media releases, and/or mailings. ADDRESSES: You may submit... Resource Management Plan (RMP). Environmental and social concerns and issues were identified through...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-28
... Register. The BLM will announce future meetings or hearings and any other public involvement activities at... solvent extraction/electro-winning facility; (5) designation of a new optional use area that could be... years; overall closure and reclamation activities are anticipated to extend approximately 10 years...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 04880, LLCAD06000, L51010000.FX0000... Conservation Area Plan Amendment AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability... Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-24
... Boundary and Water Commission (USIBWC) and Bureau of Land Management (BLM) Lands in Seldon Canyon, Do... through 1508); and the United States Section, Operational Procedures for Implementing Section 102 of NEPA... Water Commission and Bureau of Land Management Lands are available. An environmental impact statement...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-01
...] Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, Montana AGENCY: Fish and... conservation plan (CCP) and environmental impact statement (EIS) for Charles M. Russell and UL Bend National... are extending the comment period for review of the draft CCP and EIS for Charles M. Russell NWR and UL...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-04
... Vantage-Pomona Heights 230kV Transmission Line Project in Yakima, Grant, Benton, and Kittitas Counties, WA...) has prepared a Draft Environmental Impact Statement (EIS) for the Vantage- Pomona Heights 230kV... submit comments related to the Vantage-Pomona Heights 230kV Transmission Line Project by any of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... the analysis in the Draft EIS. Each of the public meetings will include an open house information... review at the following public libraries: 1. Multnomah County Central Library, 801 Southwest 10th Avenue, Portland, Oregon 97205. 2. Boardman Branch of the Oregon Trail Library District, 200 South Main Street...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
... September 2008. SUPPLEMENTARY INFORMATION: BOEMRE developed the Draft SEIS for CPA Lease Sale 216/222 to consider new information made available since completion of the Multisale EIS and 2009-2012 SEIS, including information concerning the Deepwater Horizon event and spill and new regulatory requirements. This Draft SEIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the Proposed Point Molate Resort and Casino for the Guidiville Band of the Pomo Indians, Contra Costa County... Impact Statement (EIS) for the BIA Federal action of approving the fee-to- trust transfer and casino...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... right-of-way (ROW) authorization to construct and operate a 45-megawatt solar photovoltaic project and... Energy Solutions Lucerne Valley Solar Project, San Bernardino County, CA, and the Draft California Desert... Statement (EIS) for the proposed Chevron Energy Solutions Lucerne Valley Solar Project and by this notice is...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... a Draft Environmental Impact Statement for the West Coast Recycling Group Project in West Sacramento... (EIS/EIR) for the development of the West Coast Recycling Group project located at the Port of West... meeting date. SUPPLEMENTARY INFORMATION: Description of the Proposed Action The West Coast Recycling Group...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-17
... Environmental Impact Statement for the Silver Strand Training Complex AGENCY: Department of the Navy, DoD. ACTION: Notice. SUMMARY: A notice of availability was published by the U.S. Environmental Protection... (SSTC) Draft Environmental Impact Statement (EIS). The public review period ended on March 8, 2010. This...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-23
... and Draft Environmental Impact Statement: I-17 Corridor Improvement Study; Maricopa County, Arizona... Corridor Improvement Study was published in the Federal Register on January 6, 2010. FOR FURTHER... Corridor is located in the city of Phoenix, and the study area limits for the EIS consisted of...
33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents
Code of Federal Regulations, 2012 CFR
2012-07-01
... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...
33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents
Code of Federal Regulations, 2011 CFR
2011-07-01
... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...
33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents
Code of Federal Regulations, 2013 CFR
2013-07-01
... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...
33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents
Code of Federal Regulations, 2014 CFR
2014-07-01
... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... Cow Creek Watersheds Grazing Permit Renewal, ID AGENCY: Bureau of Land Management, Interior. ACTION... the Jump Creek, Succor Creek, and Cow Creek Watersheds Grazing Permit Renewal and by this notice is... receive written comments on the Draft EIS for the Jump Creek, Succor Creek, and Cow Creek Watersheds...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... (EIS) for the Lost Creek Uranium In Situ Recovery (ISR) Project and by this notice is announcing the...-166318] Notice of Availability of the Draft Environmental Impact Statement for the Lost Creek Uranium In Situ Recovery Project, Wyoming AGENCY: Bureau of Land Management, Interior. [[Page 25194
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... deep saline geologic formations for permanent geologic storage. DATES: DOE invites the public to...; or by fax (304) 285-4403. The Draft EIS is available on DOE's NEPA Web page at: http://nepa.energy.gov/DOE_NEPA_documents.htm ; and on the National Energy Technology Laboratory's Web page at: http...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent to Prepare a Draft Environmental Impact Statement for the Proposed Cordova Hills Project in Sacramento County, CA, Corps Permit.... Potentially significant issues to be analyzed in depth in the EIS include loss of waters of the United States...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-28
...: Thomas Bills, Buffalo RMP Team Leader, BLM Buffalo Field Office, 1425 Fort Street, Buffalo, WY 82834... sage-grouse, livestock grazing, air quality, lands with wilderness characteristics, suitability for... CFR 1506.10, 43 CFR 1610.2. Donald A. Simpson, State Director, Wyoming. [FR Doc. 2013-15381 Filed 6-27...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
...) Public services and transportation; (7) Recreation and tourism; (8) Social and economic effects; and (9... and any other public involvement activities at least 15 days in advance through public notices, media... the media, mailings, and the BLM Web site. Public meetings were held in Burns, Bend, Frenchglen, and...
Wood, Molly S.
2014-01-01
The U.S. Geological Survey (USGS), in cooperation with the Bureau of Land Management (BLM), estimated streamflow statistics for stream segments designated “Wild,” “Scenic,” or “Recreational” under the National Wild and Scenic Rivers System in the Owyhee Canyonlands Wilderness in southwestern Idaho. The streamflow statistics were used by the BLM to develop and file a draft, federal reserved water right claim to protect federally designated “outstanding remarkable values” in the Jarbidge River. The BLM determined that the daily mean streamflow equaled or exceeded 20, 50, and 80 percent of the time during bimonthly periods (two periods per month) and the bankfull (66.7-percent annual exceedance probability) streamflow are important thresholds for maintaining outstanding remarkable values. Although streamflow statistics for the Jarbidge River below Jarbidge, Nevada (USGS 13162225) were published previously in 2013 and used for the draft water right claim, the BLM and USGS have since recognized the need to refine streamflow statistics given the approximate 40 river mile distance and intervening tributaries between the original point of estimation (USGS 13162225) and at the mouth of the Jarbidge River, which is the downstream end of the Wild and Scenic River segment. A drainage-area-ratio method was used in 2013 to estimate bimonthly exceedance probability streamflow statistics at the mouth of the Jarbidge River based on available streamgage data on the Jarbidge and East Fork Jarbidge Rivers. The resulting bimonthly streamflow statistics were further adjusted using a scaling factor calculated from a water balance on streamflow statistics calculated for the Bruneau and East Fork Bruneau Rivers and Sheep Creek. The final, adjusted bimonthly exceedance probability and bankfull streamflow statistics compared well with available verification datasets (including discrete streamflow measurements made at the mouth of the Jarbidge River) and are considered the best available estimates for streamflow statistics in the Jarbidge Wild and Scenic River segment.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-09
...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Copper Flat Mine Plan of... the Draft EIS. ADDRESSES: You may submit comments related to the Copper Flat EIS Project by any of the... New Mexico Copper Corp. to re-start the Copper Flat Mine located in Sierra County, New Mexico. The...
NEPA Manual for Materiel Acquisition
2000-11-01
of it in the final EIS. For example, a commentor on a draft EIS on a proposal for a pumped storage power facility might suggest that the applicant’s...strips around streams and replacing inorganic fertilizers with animal manures, and reducing soil erosion through modified tillage and irrigation...available items and products for military application (for example, sportsman’s products and wear such as holsters , shotguns, sidearms, protective shields
Code of Federal Regulations, 2011 CFR
2011-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Code of Federal Regulations, 2014 CFR
2014-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Code of Federal Regulations, 2012 CFR
2012-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Code of Federal Regulations, 2013 CFR
2013-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... Draft Environmental Impact Statement for a Proposed Flood Risk Management Project on the Red River of... Study (EIS/FS) for a Proposed Fargo- Moorhead Flood Risk Management Project on the Red River of the North in Fargo, ND, and Moorhead, MN (Proposed Fargo-Moorhead Project). On May 5, 2009, the St. Paul...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-02
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the... all work on an Environmental Impact Statement (EIS) for the BIA Federal action of approving a 70.277 acre fee-to-trust transfer and casino project located within Do[ntilde]a Ana County, New Mexico. DATES...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
... Resource Management Plan. The proposed wind turbines would be up to 262-feet-tall from the ground to the... to 415 feet. In addition to the wind turbines, the proposed project would require the construction of... the Draft EIS--an 87 wind turbine layout, a 96 wind turbine alternative, and a no-action alternative...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... decommission an up to 750 megawatt (MW) photovoltaic solar energy generation facility and necessary ancillary... LVRWB10B3980] Notice of Availability of a Draft Environmental Impact Statement for the Proposed McCoy Solar... Impact Statement (EIS) for McCoy Solar, LLC's right-of-way (ROW) application for the McCoy Solar Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-17
... and Draft Environmental Impact Statement: I-10 Corridor Improvement Study; Maricopa County, AZ AGENCY..., Arizona. A NOI to prepare an EIS for the I-10 Corridor Improvement Study was published in the Federal..., Arizona. The I-10 Corridor is in or adjacent to the cities of Phoenix, Tempe, and Chandler, as well as the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-27
... Continental Shelf, Alaska OCS Region, Chukchi Sea Planning Area, Oil and Gas Lease Sale 193 AGENCY: Bureau of...: BOEMRE announces the availability of a Revised Draft SEIS, OCS Oil and Gas Lease Sale 193, Chukchi Sea.... The Revised Draft SEIS augments the analysis of the Final EIS, Oil and Gas Lease Sale 193, Chukchi Sea...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hermeston, Mark W.
2002-02-19
Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. The lands in this SA are administered by BLM. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currentlymore » or will soon be a hazard to the transmission line. BPA’s overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA standards. Work is to begin in March 2002. In accordance with a court injunction, no chemical treatment is planned on BLM lands.« less
Wildlife guilds in Arizona desert habitats
Short, Henry L.
1983-01-01
This report summarizes information produced from Interagency Agreement No. AA-851-IA1-27 between the Bureau of Land Management (BLM), USDI, and the Fish and Wildlife Service (FWS), USDI. The contract was instrumental in the final development of wildlife guilds for the Hualapai-Aquarius planning area of the BLM in westcentral Arizona, reported herein. The Arizona study area was selected for the application of the guilding technology because a thorough assessment of the floral and faunal resources had recently occurred in conjunction with the development of a grazing Environmental Impact Statement (EIS). Thus, the association of wildlife species with habitat type was well known, which aided in the compilation of the data base necessary for the development of guilds. Some data were also available that described the vegetative structure of habitats. This was useful in the development of a model that evaluated the quality of habitat on the basis of the diversity of cover in those habitats (Short 1982).
76 FR 82296 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
.... 20110431, Draft EIS, USFS, NV, Geothermal Leasing on the Humboldt-Toiyabe National Forest, To Facilitate the Development and Production of Geothermal Energy, Ely, Austin, Tonopah and Bridgeport Ranger...
75 FR 80807 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-23
..., CA, East County Substation/Tule Wind/ Energia Sierra Juarez Gen-Tie Projects, Construction and.... 20100462, Draft EIS, FWS, CA, Santa Clara Valley Habitat Plan, To Protect and Enhance Ecological Diversity...
75 FR 36386 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-25
..., Revised Draft EIS, USFS, 00, Uinta National Forest Oil and Gas Leasing, Implementation, Identify National Forest Systems Lands with Federal Mineral Rights, Wasatch, Utah, Juab, Tooele, and Sanpete Counties, UT...
76 FR 72702 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... PV Solar Generating Station and Associated Infrastructure, Clark County, NV, Comment Period Ends: 01.... 20110400, Draft EIS, BIA, NV, K Road Moapa Solar Generation Facility, Moapa Band of Paiutes (Tribe), to...
76 FR 18217 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
.... 20110089, Draft EIS, HUD, CA, West Coast Recycling Group Metal Recycling Facility Project, Proposal to Develop and Operate a Scrap Metal Shredding and Recycling Facility at the Port of West Sacramento, Yolo...
Report: Evaluation of Superfund Environmental Indicators
Report #2002-P-3, December 27, 2001. Overall, the draft Superfund EIs were suitable because they measure a state of the environment, instead of marking the completion of an administrative step in the Superfund cleanup process.
Code of Federal Regulations, 2013 CFR
2013-07-01
... CFR 1503 and 1506.6. A lack of response may be presumed to indicate that the party has no comment to... will provide comments on another Federal agency's draft EIS even if the response is no comment...
76 FR 63922 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... City Charlotte to I-485 near the Mecklenburg-Cabarrus County Line, Charlotte-Mecklenburg County, NC, Review Period Ends: 11/ 14/2011, Contact: Brian C. Smart 404-865-5607. EIS No. 20110342, Draft Supplement...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... (Branchinecta lynchi), vernal pool tadpole shrimp (Lepidurus packardi), Sacramento Orcutt grass (Orcuttia viscida) and slender Orcutt grass (Orcuttia tenuis). The EIS will include alternatives to the Proposed...
Geologic map of the South Jackson Mountains Wilderness Study Area, Humboldt County, Nevada
Sorensen, Martin L.
1986-01-01
The South Jackson Mountains Wilderness Study Area is in south-central Humboldt County, approximately 50 miles northwest of Winnemucca, Nevada. The boundaries originally specified for the wilderness study area encompassed an area of 60,211 acres. The draft Environmental Impact Statement issued in 1983 by the U.S. Bureau of Land Management (BLM) identified 20,094 acres within the wilderness study area as potentially suitable for inclusion into the National Wilderness Preservation System. Subsequent (August 27, 1984) deletions by the BLM have resulted in the present study area of approximately 10,300 acres. The boundaries of the study area are approximated by the range crestline to the east and the 4,400-ft contour along the west side of the range from King Lear Peak north to the divide between Hobo and Christiorsson Canyons.
78 FR 13873 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-01
..., CA, Middle Fork American River Project, Review Period Ends: 04/01/2013, Contact: Matt Buhyoff 202-502.... 20130048, Draft EIS, BOEM, 00, Gulf of Mexico OCS Oil and Gas Lease Sales: 2014 and 2016 Eastern Planning...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The US Department of Energy (DOE), prepared a draft Supplement Analysis (SA) for Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL-L), in accordance with DOE`s requirements for implementation of the National Environmental Policy Act of 1969 (NEPA) (10 Code of Federal Regulations [CFR] Part 1021.314). It considers whether the Final Environmental Impact Statement and Environmental Impact Report for Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore (1992 EIS/EIR) should be supplement3ed, whether a new environmental impact statement (EIS) should be prepared, or no further NEPA documentation is required. The SAmore » examines the current project and program plans and proposals for LLNL and SNL-L, operations to identify new or modified projects or operations or new information for the period from 1998 to 2002 that was not considered in the 1992 EIS/EIR. When such changes, modifications, and information are identified, they are examined to determine whether they could be considered substantial or significant in reference to the 1992 proposed action and the 1993 Record of Decision (ROD). DOE released the draft SA to the public to obtain stakeholder comments and to consider those comments in the preparation of the final SA. DOE distributed copies of the draft SA to those who were known to have an interest in LLNL or SNL-L activities in addition to those who requested a copy. In response to comments received, DOE prepared this Comment Response Document.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
...In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) Hassayampa Field Office, Phoenix, Arizona, intends to prepare an Environmental Impact Statement (EIS) which may include discussion of an amendment to the Bradshaw-Harquahala Resource Management Plan (RMP), and by this notice is announcing the beginning of the scoping process to solicit public comments and identify issues.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... correspondence. FOR FURTHER INFORMATION CONTACT: Chief Engineer, Engineering Service (138), San Francisco...-4810, extension 2009. The SFVAMC LRDP and Draft EIS are available for viewing on the SFVAMC Web site...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
... Control Specialists, LLC, site near Andrews, Texas. Since publication of the 2011 Mercury Storage EIS, DOE... identified the Waste Control Specialists, LLC location near Andrews, Texas, as the Preferred Alternative in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... that water quality has improved, these canals allow the transfer of both indigenous and nonindigenous... Water and Related Land Resource Implementation Studies, Water Resources Council, March 10, 1983. 2...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
... individuals and organizations who have submitted specific written comments related to the proposed action... the draft EIS will be eligible to file an objection under the Healthy Forests Restoration Act. The...
2017-08-31
U.S. Department of Agriculture – Natural Resources Conservation Service (USDA-NRCS); Richard Darden, USACE Alaska District; and representatives from...Slope Science Initiative USDA-NRCS U.S. Department of Agriculture – Natural Resources Conservation Service USDOI-BLM U.S. Department of the Interior... Agriculture , Forest Service, Pacific Southwest Research Station. Reddy, K. R., and R. D. DeLaune. 2008. Biogeochemistry of wetlands: Science and
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
... that are safe, humane, cost-efficient, and appropriately secure, and that provide work and other self-improvement opportunities to assist offenders in becoming law-abiding citizens. The Bureau accomplishes its...
16 CFR 1021.8 - Legislative proposals.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ENVIRONMENTAL REVIEW Procedures § 1021.8... hearings and deliberations. The draft EIS shall be forwarded to the Environmental Protection Agency in accordance with § 1506.9 of the NEPA regulations. Comments on the legislative statement and CPSC's responses...
Code of Federal Regulations, 2011 CFR
2011-07-01
... as when there has been a significant change in circumstances, development of significant new... proposed action. Significant new information leading to public controversy regarding the scope after the scoping process is such a changed circumstance. An additional public comment period may also be necessary...
76 FR 50213 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
... Bakersfield Section High-Speed Train, Proposes to Construct, Operate, and Maintain an Electric-Powered High...): Merced to Fresno Section High-Speed Train, Proposes to Construct, Operate, and Maintain an Electric.... 20110190, Draft EIS, FRA, MS, Tupelo Railroad Relocation Planning and Environmental Study, To Improve...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... 2012 (see 16 U.S.C. 3831(d)). Alfalfa and multiyear grasses and legumes in a rotation practice with an... pollinators (see 16 U.S.C. 3844(h)). Under the National Environmental Policy Act (NEPA), the EIS process...
75 FR 38833 - Walker River Basin Acquisition Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... Acquisition Program recipient and has therefore determined National Environmental Policy Act (NEPA) compliance... that NEPA compliance is not required in the July 2009 Draft EIS and shared the decision at the August... address the lake's environmental conditions. Reclamation's role related to the Acquisition Program as...
EIS No. 20100312 EIS Comanche Peak Nuclear Power Plant Units 3 and 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bjornstad, David J
2010-08-01
In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31,more » 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100312, Draft EIS, NRC, TX, Comanche Peak Nuclear Power Plant Units 3 and 4, Application for Combined Licenses (COLs) for Construction Permits and Operating Licenses, (NUREG-1943), Hood and Somervell Counties, TX, Comment Period Ends: 10/26/2010.« less
A study of the review and comment phase of the environmental impact statement : draft and negative.
DOT National Transportation Integrated Search
1972-01-01
This study examined the agencies that review the environmental impact statements (EIS) prepared on highway projects and was an attempt to shed light on the functions, personnel, and problems of the offices that saw the statements. The report covered ...
A study of the review and comment phase of the draft environmental impact statement.
DOT National Transportation Integrated Search
1974-01-01
Since the enactment of the National Environmental Policy Act in 1969, there has been considerable change in the efficiency of the preparation and distribution of environment a impact statements (EIS). This study was an evaluation of the review and co...
15 CFR 971.212 - Public notice, hearing and comment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested... public hearing on the application and the draft EIS in an appropriate location and may employ additional...
15 CFR 971.212 - Public notice, hearing and comment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested... public hearing on the application and the draft EIS in an appropriate location and may employ additional...
15 CFR 971.212 - Public notice, hearing and comment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested... public hearing on the application and the draft EIS in an appropriate location and may employ additional...
15 CFR 971.212 - Public notice, hearing and comment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested... public hearing on the application and the draft EIS in an appropriate location and may employ additional...
76 FR 5156 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... Firm Water Supplies, Improve Water Quality, and to Reduce Water Costs, San Bernardino and Riverside.... 20110020, Draft EIS, NRCS, IA, Clarke County Water Supply, To Construct a Multiple-purpose Structure that Provides for Rural Water Supply and Water Based Recreational Opportunities, Clarke County, IA, Comment...
75 FR 81972 - New England Fishery Management Council; Public Meeting; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-29
... Committee will continue development of catch monitoring alternatives for inclusion in Amendment 5 to the... management alternatives for inclusion in Amendment 5 Draft EIS (catch monitoring program, measures to address... physically accessible to people with disabilities. Requests for sign language interpretation or other...
40 CFR 149.105 - Decision to review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Administrator shall review under section 1424(e) all projects located in the recharge or streamflow source zone of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... 149.105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...
40 CFR 149.105 - Decision to review.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Administrator shall review under section 1424(e) all projects located in the recharge or streamflow source zone of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... 149.105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...
15 CFR 921.12 - Post site selection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...
15 CFR 921.12 - Post site selection.
Code of Federal Regulations, 2014 CFR
2014-01-01
... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...
15 CFR 921.12 - Post site selection.
Code of Federal Regulations, 2013 CFR
2013-01-01
... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...
15 CFR 921.12 - Post site selection.
Code of Federal Regulations, 2012 CFR
2012-01-01
... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park... Service is expanding the scope of the Environmental Impact Statement (EIS) that is being prepared for updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...
78 FR 20632 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... Management Project, Rio Grande National Forest, Review Period Ends: 05/17/2013, Contact: Diana McGinn 719-852... Creek Management Area Proposed Resource Management Plan, Review Period Ends: 05/06/2013, Contact: Sky.... EIS No. 20130082, Draft Supplement, FERC, ME, Downeast Liquefied Natural Gas (LNG) Project, Comment...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... because they partially overlap in their study areas, purpose, potential improvements, potential effects... that an EIS/EIR will be prepared to describe alternatives, potential environmental effects, and... funding toward flood management improvements. These funds may be matched with those from the Early...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... geothermal unit, which is currently providing energy sufficient to power three operating geothermal plants... the Casa Diablo IV Geothermal Development Project, CA AGENCY: Bureau of Land Management, Interior... Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development...
43 CFR 10010.45 - Time periods.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Time periods. 10010.45 Section 10010.45... Environmental Impact Statements § 10010.45 Time periods. (a) The minimum review period for a draft EIS will be... proposed reductions in time periods or any extensions of time periods proposed by those agencies. ...
43 CFR 10010.45 - Time periods.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Time periods. 10010.45 Section 10010.45... Environmental Impact Statements § 10010.45 Time periods. (a) The minimum review period for a draft EIS will be... proposed reductions in time periods or any extensions of time periods proposed by those agencies. ...
43 CFR 10010.45 - Time periods.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Time periods. 10010.45 Section 10010.45... Environmental Impact Statements § 10010.45 Time periods. (a) The minimum review period for a draft EIS will be... proposed reductions in time periods or any extensions of time periods proposed by those agencies. ...
75 FR 60804 - Nimbus Hatchery Fish Passage Project, Lower American River, California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Nimbus Hatchery Fish Passage Project, Lower... Act (CEQA), the Bureau of Reclamation, the lead Federal agency, and the California Department of Fish... Draft EIS/EIR for the Nimbus Hatchery Fish Passage Project (Project). The purpose of the Project is to...
15 CFR 921.12 - Post site selection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...
75 FR 58348 - Revision of the Shoshone National Forest Land and Resource Management Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... process: 1. Comprehensive Evaluation Report (CER) (April 2009)--Much of the background material in this report will be carried forward in the Analysis of the Management Situation or draft EIS. The CER..., and ecological conditions and trends that contribute to sustainability. The CER identifies factors...
78 FR 65643 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
..., Gas Hills In-Situ Recovery Uranium Project, Review Period Ends: 12/02/2013, Contact: Tom Sunderland..., Tiering FEIS--U.S. Coast Guard Rulemaking for Dry Cargo Residue Discharges in the Great Lakes, Review... No. 20130290, Draft EIS, NPS, CA, Restoration of Native Species in High Elevation Aquatic Ecosystems...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-14
...: The park includes five remote islands spanning 2,228 square miles of land and sea. Updating the park's... General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands National Park... (GMP)/Wilderness Study/Environmental Impact Statement (EIS) for Channel Islands National Park. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA); the Federal Land Policy and Management Act of 1976, as amended; and the California Environmental Quality Act of 1970 (CEQA), the Bureau of Land Management (BLM), the United States Forest Service (USFS), and the Great Basin Unified Air Pollution Control District (GBUAPCD), a California State agency, have prepared a Final Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development Project near the town of Mammoth Lakes in Mono County, California, and by this notice are announcing its availability.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... Management Plan/ Environmental Impact Statement for Effigy Mounds National Monument, Iowa AGENCY: National... Protection Agency. Public meetings will be held during the 60-day review period on the GMP/EIS in the Harpers... experience, to the socioeconomic environment, and to monument operations and facilities. The preferred...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-03
... INFORMATION CONTACT: Ms. Christine Stevenson, EHW-2 EIS Project Manager, 1101 Tautog Circle, Silverdale, Washington 98315-1101; or http://ehw.nbkeis.com/ . SUPPLEMENTARY INFORMATION: This notice announces a fifteen... Manager, 1101 Tautog Circle, Silverdale, Washington 98315-1101. In addition, comments may be submitted...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... the training requirements of military units in Hawai`i. This modernization would improve the quality... at PTA are old, are operating beyond their useful life and do not meet current DoD design standards... with the possible effects to air quality, historic resources, and threatened and endangered species...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... completed in 1957 as an integral component of the Los Angeles County Drainage Area system of dams and... several measures including: emergency management preparedness, remote monitoring, increased inspections... Scope of Analysis. The EIS will also evaluate the impacts of alternatives on environmental resources...
40 CFR 149.105 - Decision to review.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Sole Source Aquifer in the San Antonio, Texas Area § 149.105 Decision to review. (a) The Regional... of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... of a public petition, the Regional Administrator shall decide whether the project which is the...
40 CFR 149.105 - Decision to review.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Sole Source Aquifer in the San Antonio, Texas Area § 149.105 Decision to review. (a) The Regional... of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... of a public petition, the Regional Administrator shall decide whether the project which is the...
40 CFR 149.105 - Decision to review.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Sole Source Aquifer in the San Antonio, Texas Area § 149.105 Decision to review. (a) The Regional... of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... of a public petition, the Regional Administrator shall decide whether the project which is the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-06
... other CVP contractors, to Reclamation's Refuge Water Supply Program (RWSP) for delivery to the San... livestock and/or municipal and industrial uses because of water supply shortages or when full contract... Contractors Water Authority's 25-Year Water Transfer Program 2014 to 2038, California AGENCY: Bureau of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... Draft EIS for the Odessa Subarea Special Study. The Washington Department of Ecology (Ecology) is a... associated economic and other effects, Congress has funded Reclamation to investigate this problem. Ecology... (HB 2860) that directs Ecology to aggressively pursue development of water benefiting both instream...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-05
... Enhancement Project. The Washington State Department of Ecology (Ecology) will be a joint lead agency with..., most of these water right uncertainties have been addressed. In 2003, Reclamation and Ecology initiated... with comments on the Draft PR/EIS prompted Ecology to separate from the National Environmental Policy...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-13
..., maintenance, and decommissioning of wind turbine generators and associated facilities necessary to... the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County, CA AGENCY: Bureau of... Pattern Energy Group Ocotillo Express Wind Energy Project Draft EIR/EIS by any of the following methods...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-26
... of Ballona Creek including coastal wetlands. Santa Monica Bay Restoration Commission (SMBRC) is the... Restoration Feasibility Study, Los Angeles County, CA AGENCY: Department of the Army, U.S. Army Corps of.../Environmental Impact Report (EIS/EIR) for the Ballona Creek Ecosystem Restoration Feasibility Study in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-28
...-Stewardship/Environmental-Assessment/NEPA/nepaprocess.aspx . Comments: Federal, State, and local government... Assessment Section, Office of Environment (GM 623E), Bureau of Ocean Energy Management, Gulf of Mexico OCS... (NOA) of the Draft Supplemental Environmental Impact Statement (EIS) and Public Meetings. SUMMARY: BOEM...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... for Improvements to the Calexico West Port of Entry, Calexico, CA AGENCY: Public Buildings Service... Impact Statement (EIS) for Improvements to the Calexico West Port of Entry, Calexico, California, for... and soils) or topic area (e.g., traffic, environmental justice). After the public comment period...
33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS
Code of Federal Regulations, 2014 CFR
2014-07-01
... intent should be processed through local Chief, Information Management channels to: HQDA, SFIS-APP, ATTN...) WASH DC 20314-1000 by 1 June of each year. Consult the local chief, Information Management for... Register. The following information is furnished for preparation and publication of notices of intent in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
... environmental impact statement (EIS) for the Mount Rushmore National Memorial General Management Plan (GMP) and will be preparing an Environmental Assessment (EA) instead. DATES: The draft GMP EA is expected to be... the appropriate level of environmental documentation for the GMP. Preliminary analysis of alternatives...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-08
... High-Speed Train Project Fresno to Bakersfield Section AGENCY: Federal Railroad Administration (FRA... Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Fresno to... lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... Environmental Impact Statement for the Toledo Bend Hydroelectric Project In accordance with the National... Office of Energy Projects has reviewed the application for license for the Toledo Bend Hydroelectric... the Toledo Bend Project. The draft EIS documents the views of governmental agencies, non- governmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
...We, the U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game (CDFG), in cooperation with the Sonoma Land Trust (SLT), announce that a final environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and Watershed Restoration Project is now available. The final EIR/EIS, which we prepared and now announce in accordance with the National Environmental Policy Act of 1969 (NEPA), describes the restoration of approximately 2,300 acres (ac) of former farmland located in Sonoma County, California, near the San Pablo Bay. The final EIR/EIS responds to all comments we received on the draft document. The restoration project, which would be implemented by the SLT, would restore natural estuarine ecosystems on diked baylands, while providing public access and recreational and educational opportunities compatible with ecological and cultural resources protection. The U.S. Army Corps of Engineers, San Francisco District, and the National Marine Fisheries Service of the National Oceanic and Atmospheric Administration are cooperating agencies on the final EIR/EIS.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
... via the U.S. Postal Service to Naval Facilities Engineering Command Southeast, NAS Key West Air... the project Web site ( http://www.keywesteis.com ). All statements, oral or written, submitted during... Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30, Building 903, NAS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-02
... preparation of a draft environmental impact statement (EIS) to an EA for Regulatory Amendment 14. FOR FURTHER... of No Significant Impact (FONSI), the EA and FONSI will be the final environmental documents required by NEPA. If the EA reveals that significant environmental impacts may be reasonably expected to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... scope of the action alternative which include acreage, water supply, and general site locations would... authorized boundary with a surface water supply as part of continued phased development of the CBP. The... alternative impacts considered in the Draft EIS. Two water supply options are being considered that would use...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... Environmental Impact Statement/ Environmental Impact Report for the Proposed Cambria Water Supply Project, San... Report (EIS/EIR) to study, plan, and implement a project to provide for a reliable water supply for the... the area relying solely upon local groundwater for its current water supply. The groundwater supplies...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments on the proposed water supply pipeline and the draft EIS. Additionally, as discussed below, we will be...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
...), for proposed geothermal energy projects covering a combined area of approximately 24,152 acres in the... Environmental Impact Statement for the Salt Wells Energy Projects, Churchill County, NV AGENCY: Bureau of Land... Environmental Impact Statement (EIS) for the Salt Wells Energy Projects and by this notice is announcing the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-17
... plant (Alternative 4); construction and operation of a geothermal energy facility (Alternative 5); and... Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort Bliss, Texas and New Mexico... proposes to implement Net Zero energy, water and waste initiatives by 2020 at Fort Bliss to meet mandates...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-19
... National Wildlife Refuge System, consistent with sound principles of fish and wildlife management... implementation. Alternative 2 is the foundation of our CCP. The CCP will guide our management and administration... management issues in our Draft and Final CCP/EIS. To address these issues, we developed and evaluated three...
75 FR 9573 - Minnkota Power Cooperative, Inc: Bemidji-Grand Rapids 230kV Transmission Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
... Rapids 230kV Transmission Project AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability... copy of the Draft EIS may be viewed online at the following Web sites: http://www.usda.gov/rus/water..., Longville, MN 56655; Walker Public Library, 207 4th St., Walker, MN 56484; Bovey Public Library--Village...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-03
... reach. The County has nourished the project area dune toes on several occasions and has planted native dune vegetation at several locations. Due to the narrow beach profile, much of this effort has been... nourishment and dune restoration through filling activities, groins, segmented submerged breakwaters, upland...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-24
... Western Planning Area (WPA) Lease Sale 233 and Central Planning Area (CPA) Lease Sale 231 (WPA/CPA... is reopening the scoping comment period. DATES: Scoping comments for this Draft WPA/CPA Supplemental...-opening of the scoping process for the WPA/CPA Supplemental EIS. Throughout the scoping process, Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... Impact Statement for the Silver Strand Training Complex, San Diego, CA; Correction AGENCY: Department of... Impact Statement for the Silver Strand Training Complex, San Diego, CA. The document contained incorrect.... Kent Randall, SSTC EIS Project Manager, 1220 Pacific Highway, Building 1, 5th Floor, San Diego, CA...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... for the Cape Hatteras National Seashore (Seashore) Off-Road Vehicle Management Plan (Plan/EIS). The... off-road vehicle (ORV) use/access in the Seashore to protect and preserve natural and cultural... among various users, and to promote the safety of all visitors. Executive Order 11644 of 1972, amended...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... (western side) and conducting supplemental sand placement along the eastern end of the island. Final locations and placement of sand will be determined during the project design process. For the groin... mammals, birds, fish, and plants. c. Potential impacts associated with using inlets as a sand source. d...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-04
... Availability and Notice of Hearing for the Alton Coal Tract Coal Lease by Application Draft Environmental... Impact Statement (EIS) for the Alton Coal Tract Lease by Application (LBA) and by this Notice is... the Fair Market Value (FMV) of the Federal coal resources. DATES: To ensure comments will be...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-31
...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Rising Tree Wind Farm... on issues and alternatives related to the Rising Tree Wind Farm Draft EIS/EIR and possible CDCA PA by...-megawatt Rising Tree Wind Farm. The proposed project is approximately three miles west of the town of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... Dam. The project will consist of up to 335 wind turbine generators (WTGs). Construction may consist of... County Wind Farm Project, Mohave County, AZ AGENCY: Bureau of Land Management, Interior. ACTION: Notice....gov/az/st/en/prog/energy/wind/mohave.html . In order to be included in the Draft EIS, all comments...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... construction of up to 52 wind turbines and ancillary facilities. The project is 25 miles southeast of Bend... Butte Wind Power Right-of-Way, Crook and Deschutes Counties, OR AGENCY: Bureau of Land Management... Statement (EIS) for the West Butte Wind Power Right-of-Way and by this notice is announcing the opening of...
Cooper Lake and Channels, Texas.
1977-04-01
maintenance. Adverse esthetic impacts of the channel and levees. Inundation of some 90 archeo- logical sites which have been tested to the extent...below the reservoir was approximately ’,0 percent complete. In June 1976, the draft environmental impact statement (EIS) was coordinated for review and...construction necessitates cutting off natural channel bends. 3. a. Environmental Impacts : (I) Reservoir. The flood storage space in the approved
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-05
... Environmental Impact Statement for the Proposed RES Americas Moapa Solar Energy Center, Clark County, Nevada... environmental impact statement (DEIS) for the proposed RES Americas Moapa Solar Energy Center on the Moapa River... Progress and on the following Web site: www.MoapaSolarEnergyCenterEIS.com . In order to be fully considered...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-25
.../barstow/K Road_ Calico_Solar.html. E-mail: CalicoPV[email protected] . Fax: (760) 252-6098. Mail: Bureau of... Calico Solar Project, San Bernardino County, CA AGENCY: Bureau of Land Management, Interior. ACTION... Statement (EIS) for an amendment to the right-of- way (ROW) grant for the K Road Calico Solar Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... end range from 4-8 feet a year based on the latest shoreline change update developed by the NC Division of Coastal Management. The overall length of the terminal groin could range from 800-1,000 feet; however, the final dimensions of the structure could differ following detailed engineering design. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
... Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service... Impact Statement (EIS) for Adoption of a Long-term Experimental and Management Plan (LTEMP) for the Operation of Glen Canyon Dam to January 31, 2012. The Notice to Solicit Comments and Hold Public Scoping...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Regulatory Commission (NRC) and the U.S. Army Corps of Engineers as a cooperating agency have published a... Licenses (COLs) at the South Texas Project Electric Generating Station Units 3 and 4: Final Report'' for the South Texas Project Electric Generating Station Units 3 and 4 COL application. The draft EIS was...
Review of the Final EIS/EIR and HCP/SYP for the Headwaters Forest Project
Leslie M. Reid
1999-01-01
These comments are arranged to follow the pattern used by Reid (1998a) to allow convenient comparison with the original comments concerning the draft plan. Because of the dominating role played by alterations to sediment, woody debris and water regimes in the generation of cumulative watershed impacts, these components are discussed first. New information concerning...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-18
... Environmental Impact Statement for Effects of Oil and Gas Activities in the Arctic Ocean AGENCY: National Marine... Environmental Impact Statement (DEIS) for the Effects of Oil and Gas Activities in the Arctic Ocean.'' Based on... Web page at: http://www.nmfs.noaa.gov/pr/permits/eis/arctic.htm . FOR FURTHER INFORMATION CONTACT...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Lost Creek In Situ Uranium Recovery Project in Sweetwater County, WY AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... the Draft EIS. ADDRESSES: You may submit comments related to the Lost Creek In Situ [[Page 7878...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... and H.P. Wright Library Branch. The Final EIS/EIR is available at the Corps' Web site: http://www.spl... includes a draft general conformity determination (see Section 3.2, Section 4.7 and Appendix D.7), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... protection regulation at two existing M&R stations; Installation of three pig launchers and two pig receivers, relocation of four pig receivers, and removal of two pig launchers; Installation of four mainline and three... to accommodate a temporary pig receiver. The draft EIS has been placed in the public files of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
... Continental Shelf (OCS), Western Planning Area (WPA) and Central Planning Area (CPA), Oil and Gas Lease Sales... prepared a Draft EIS on oil and gas lease sales tentatively scheduled in 2012-2017 in the WPA and CPA... scheduled for the WPA and five annual areawide lease sales are scheduled for the CPA. The proposed WPA lease...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-21
... William States Lee III Nuclear Station Site, Units 1 and 2; Duke Energy Carolinas, LLC AGENCY: Nuclear... Statement for Combined Licenses (COL) for William States Lee III Nuclear Station Units 1 and 2 [Lee Nuclear... draft EIS can be accessed online at the NRC's William States Lee III Nuclear Site Web page at http://www...
Draft Environmental Impact Statement for the Ulysses Mission (Tier 2)
NASA Technical Reports Server (NTRS)
1990-01-01
This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Ulysses spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special(PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG). The potential effects considered in this EIS include risks of air and water quality impacts, local land area contamination, adverse health and safety impacts, the disturbance of biotic resources, impacts on wetland areas or areas containing historical sites, and socioeconomic impacts. Intensive analysis of the possible accidents associated with the proposed action are underway and preliminary results indicate small health or environmental risks. The results of a Final Safety Analysis Report will be available for inclusion into the final EIS.
1990-02-01
one of the most valuable assets in the Air Force inventory . This Tier 1 EIS is one tool designed to contribute to the decisionmaking process. The...M3.2-7 M3.2.5 Emission Inventories ...M3.5.3.2 Prehistoric Archaeological Resource Inventory ........................................................... M3.5-4 M3.5.4 Historic and Architectural
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-27
... Street, NE, Room 2A, Washington, DC 20426, (202) 502-8371. CD-ROM copies of the draft EIS were mailed to.... A limited number of hard copies and CD-ROMs are available from the Public Reference Room identified above. Please note that copies of the CD-ROM were mailed with a postcard that included a docket number...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... to R-134+135. The Town proposes to place approximately 74,300 cubic yards of beach quality sand in... beach quality sand is proposed to be placed between R-134+135 and R-135+551 to elevate the existing berm... and dune restoration projects between R-128+955 and R-138+551 with sand placement and the construction...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-04
...The U.S. Air Force is issuing this notice to advise the public of an extension to submit scoping comments. The initial Notice of Availability published in the Federal Register on May 17, 2013 (Vol. 78, No. 96/Notices/29120), requested public scoping comments no later than June 10, 2013. The Air Force has extended the deadline for submitting public comments to July 5, 2013. All substantive scoping comments received during the public scoping period will be considered in the preparation of the Draft EIS. Point of Contact: Please direct any written comments or requests for information to KC-46A EIS Project Manager, National Guard Bureau, NGB/A7AM, 3501 Fetchet Avenue, Joint Base Andrews, Maryland, 20762- 5157.
A report on the Oregon Experiment: A grassroots approach to meaningful public involvement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blazek, M.L.; Dunning, D.A.; Gentry, R.
In September and October 1995, the Oregon Department of Energy (ODOE) and the Oregon Hanford Waste Board (the Board) carried out an ambitious public involvement process. They set out to explore new ways to better involve the public in technical issues involving the US Department of Energy (USDOE). They selected the draft Programmatic Environmental Impact Statement (EIS) on the Storage and Disposition of Weapons-Usable Fissile Materials as the subject for the public involvement effort. They selected this EIS because of its high degree of technical complexity, its potential for impacting Hanford cleanup and Oregon, its broad reach of issues involvingmore » all USDOE sites and the long lead time it allowed for preparation. The traditional process used by USDOE for public involvement seldom allows external agencies sufficient lead time to develop good public involvement processes. For this EIS, USDOE began the public involvement process very early in the development of the EIS, which allowed them the lead time they needed. ODOE and the Board have a great deal of experience in working with the public on a wide range of nuclear issues. This project was larger and more complex than anything they had attempted before. They used several different forums and a common format. The public response was very positive and encouraging.« less
Yakima Fisheries Project : Revised Draft Environmental Impact Statement.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1995-05-01
BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities basedmore » on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.« less
1981-09-01
Daniels Fisheries Bio- 3 Years EIS & Tech- Biologist (NIS Coordinator) logy, Applied nical Reports, Statistics U.S. Army Corps of Engineers Ed Kandler...policies that apply to the study area are discussed in the following paragraphs. Noncompliance of the detailed plans with these requirements are...for more efficient barge shipment of petroleum products into Crescent City Inner Harbor from the present to the year 2032. b. Improve the saftey
Geothermal NEPA Database on OpenEI (Poster)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, K. R.; Levine, A.
2014-09-01
The National Renewable Energy Laboratory (NREL) developed the Geothermal National Environmental Policy Act (NEPA) Database as a platform for government agencies and industry to access and maintain information related to geothermal NEPA documents. The data were collected to inform analyses of NEPA timelines, and the collected data were made publically available via this tool in case others might find the data useful. NREL staff and contractors collected documents from agency websites, during visits to the two busiest Bureau of Land Management (BLM) field offices for geothermal development, and through email and phone call requests from other BLM field offices. Theymore » then entered the information into the database, hosted by Open Energy Information (http://en.openei.org/wiki/RAPID/NEPA). The long-term success of the project will depend on the willingness of federal agencies, industry, and others to populate the database with NEPA and related documents, and to use the data for their own analyses. As the information and capabilities of the database expand, developers and agencies can save time on new NEPA reports by accessing a single location to research related activities, their potential impacts, and previously proposed and imposed mitigation measures. NREL used a wiki platform to allow industry and agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users.« less
1990-08-01
Form 7.10 Draft EIS Public Hearings Attendance and Speakers Lists 8.0 LIST OF ACRONYMS AND ABBREVIATIONS APPENDIX A: GLOBAL WARMING APPENDIX B: WHITE...expected to contribute significantly to global warming . Impacts to air quality from operations would be the same for the alternative sites. NOISE Noise...and Abbreviations List of Acronyms and Abbreviations used in the Final EM. ● Appendix A - Global Warming This appendix provides a brief discussion of
2012-06-01
information indicate that at least one designated use 22 (e.g., recreation, support of aquatic life and coral reef conservation, fishing and the consumption ...34 This EIS provides an analysis of environmental effects associated with the proposed action. The 35 following summarizes the formal NEPA process...alternatives and the No Action Alternative have been summarized in Table ES-2. A detailed analysis of 28 effects is provided in Chapter 4. 29 ES 7
Petsalaki, Eleni; Dandoulaki, Maria; Morrice, Nick; Zachos, George
2014-09-15
Chromatin bridges represent incompletely segregated chromosomal DNA connecting the anaphase poles and can result in chromosome breakage. The Bloom's syndrome protein helicase (BLM, also known as BLMH) suppresses formation of chromatin bridges. Here, we show that cells deficient in checkpoint kinase 1 (Chk1, also known as CHEK1) exhibit higher frequency of chromatin bridges and reduced BLM protein levels compared to controls. Chk1 inhibition leads to BLM ubiquitylation and proteasomal degradation during interphase. Furthermore, Chk1 constitutively phosphorylates human BLM at serine 502 (S502) and phosphorylated BLM localises to chromatin bridges. Mutation of S502 to a non-phosphorylatable alanine residue (BLM-S502A) reduces the stability of BLM, whereas expression of a phospho-mimicking BLM-S502D, in which S502 is mutated to aspartic acid, stabilises BLM and prevents chromatin bridges in Chk1-deficient cells. In addition, wild-type but not BLM-S502D associates with cullin 3, and cullin 3 depletion rescues BLM accumulation and localisation to chromatin bridges after Chk1 inhibition. We propose that Chk1 phosphorylates BLM-S502 to inhibit cullin-3-mediated BLM degradation during interphase. These results suggest that Chk1 prevents deleterious anaphase bridges by stabilising BLM. © 2014. Published by The Company of Biologists Ltd.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-14
... Bureau of Land Management (BLM) is publishing this notice to explain why the BLM Director is denying the...] BLM Director's Response to the Idaho Governor's Appeal of the BLM Idaho State Director's Governor's... (Finding) to the BLM Idaho State Director (State Director). The State Director determined the Governor's...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1991-04-01
This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build newmore » production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.« less
Selective tumor cell targeting by the disaccharide moiety of bleomycin.
Yu, Zhiqiang; Schmaltz, Ryan M; Bozeman, Trevor C; Paul, Rakesh; Rishel, Michael J; Tsosie, Krystal S; Hecht, Sidney M
2013-02-27
In a recent study, the well-documented tumor targeting properties of the antitumor agent bleomycin (BLM) were studied in cell culture using microbubbles that had been derivatized with multiple copies of BLM. It was shown that BLM selectively targeted MCF-7 human breast carcinoma cells but not the "normal" breast cell line MCF-10A. Furthermore, it was found that the BLM analogue deglycobleomycin, which lacks the disaccharide moiety of BLM, did not target either cell line, indicating that the BLM disaccharide moiety is necessary for tumor selectivity. Not resolved in the earlier study were the issues of whether the BLM disaccharide moiety alone is sufficient for tumor cell targeting and the possible cellular uptake of the disaccharide. In the present study, we conjugated BLM, deglycoBLM, and BLM disaccharide to the cyanine dye Cy5**. It was found that the BLM and BLM disaccharide conjugates, but not the deglycoBLM conjugate, bound selectively to MCF-7 cells and were internalized. The same was also true for the prostate cancer cell line DU-145 (but not for normal PZ-HPV-7 prostate cells) and for the pancreatic cancer cell line BxPC-3 (but not for normal SVR A221a pancreas cells). The targeting efficiency of the disaccharide was only slightly less than that of BLM in MCF-7 and DU-145 cells and comparable to that of BLM in BxPC-3 cells. These results establish that the BLM disaccharide is both necessary and sufficient for tumor cell targeting, a finding with obvious implications for the design of novel tumor imaging and therapeutic agents.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... Bureau of Land Management (BLM) is publishing this notice to explain why the BLM Director is rejecting... Director's Response to the Alaska Governor's Appeal of the BLM Alaska State Director's Governor's... the BLM Alaska State Director. The State Director determined the Governor's Finding was outside the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... all BLM requirements pertaining to utilization operations? 3277.12 Section 3277.12 Public Lands... § 3277.12 What will BLM do if I do not comply with all BLM requirements pertaining to utilization... corrective action within a specific time period. If the noncompliance continues or is serious in nature, BLM...
1987-04-01
importance with the development of the Atchafalaya Delta region (Thompson and Deegan , 1980). Although several works have been prepared which dealt with the...47:189-228. Craig , N.J., R.E. Turner, and J.W. Day, Jr. 1979. Land loss in coastal Louisiana (USA). J. Environ. Management 3(1): 133-144. Cratsley, D.W...University, Baton Rouge. 285 pp. EI-114 Thompson, B.A and L.A. Deegan . 1983. The Atchafalaya River delta: a "new" fishery nursery with recommendations for
The function of Xenopus Bloom's syndrome protein homolog (xBLM) in DNA replication
Liao, Shuren; Graham, Jeanine; Yan, Hong
2000-01-01
The Bloom's syndrome gene (BLM) plays a pivotal role in the maintenance of genomic stability in somatic cells. It encodes a DNA helicase (BLM) of the RecQ family, but the exact function of BLM remains elusive. To study this question, we have cloned the BLM homolog of the frog Xenopus laevis (xBLM) and have raised antibodies to it. Immunodepletion of xBLM from a Xenopus egg extract severely inhibits the replication of DNA in reconstituted nuclei. Moreover, the inhibition can be rescued by the addition of the recombinant xBLM protein. These results provide the first direct evidence that BLM plays an important role in DNA replication, suggesting that Bloom's syndrome may be the consequence of defective DNA replication. PMID:11040210
Pron, G; Mahrour, N; Orlowski, S; Tounekti, O; Poddevin, B; Belehradek, J; Mir, L M
1999-01-01
Bleomycin (BLM) does not diffuse through the plasma membrane but nevertheless displays cytotoxic activity due to DNA break generation. The aim of the study was to describe the mechanism of BLM internalisation. We previously provided evidence for the existence of BLM-binding sites at the surface of DC-3F Chinese hamster fibroblasts, as well as of their involvement in BLM cytotoxicity on DC-3F cells and related BLM-resistant sublines. Here we report that A253 human cells and their BLM-resistant subline C-10E also possessed a membrane protein of ca. 250 kDa specifically binding BLM. Part of this C-10E cell resistance could be explained by a decrease in the number of BLM-binding sites exposed at the cell surface with respect to A253 cells. The comparison between A253 and DC-3F cells exposing a similar number of BLM-binding sites revealed that the faster the fluid phase endocytosis, the greater the cell sensitivity to BLM. Moreover, the experimental modification of endocytotic vesicle size showed that BLM cytotoxicity was directly correlated with the flux of plasma membrane area engulfed during endocytosis rather than with the fluid phase volume incorporated. Thus, BLM would be internalised by a receptor-mediated endocytosis mechanism which would first require BLM binding to its membrane receptor and then the transfer of the complex into intracellular endocytotic vesicles, followed by BLM entry into the cytosol, probably from a nonacidic compartment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-10-01
This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deepmore » hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains written public comments and hearing board responses and reports offered on the draft statement.« less
Class I cultural resource overview for oil shale and tar sands areas in Colorado, Utah and Wyoming.
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Rourke, D.; Kullen, D.; Gierek, L.
2007-11-01
In August 2005, the U.S. Congress enacted the Energy Policy Act of 2005, Public Law 109-58. In Section 369 of this Act, also known as the 'Oil Shale, Tar Sands, and Other Strategic Unconventional Fuels Act of 2005', Congress declared that oil shale and tar sands (and other unconventional fuels) are strategically important domestic energy resources that should be developed to reduce the nation's growing dependence on oil from politically and economically unstable foreign sources. The Bureau of Land Management (BLM) is developing a Programmatic Environmental Impact Statement (PEIS) to evaluate alternatives for establishing commercial oil shale and tar sandsmore » leasing programs in Colorado, Wyoming, and Utah. This PEIS evaluates the potential impacts of alternatives identifying BLM-administered lands as available for application for commercial leasing of oil shale resources within the three states and of tar sands resources within Utah. The scope of the analysis of the PEIS also includes an assessment of the potential effects of future commercial leasing. This Class I cultural resources study is in support of the Draft Oil Shale and Tar Sands Resource Management Plan Amendments to Address Land Use Allocations in Colorado, Utah, and Wyoming and Programmatic Environmental Impact Statement and is an attempt to synthesize archaeological data covering the most geologically prospective lands for oil shale and tar sands in Colorado, Utah, and Wyoming. This report is based solely on geographic information system (GIS) data held by the Colorado, Utah, and Wyoming State Historic Preservation Offices (SHPOs). The GIS data include the information that the BLM has provided to the SHPOs. The primary purpose of the Class I cultural resources overview is to provide information on the affected environment for the PEIS. Furthermore, this report provides recommendations to support planning decisions and the management of cultural resources that could be impacted by future oil shale and tar sands resource development.« less
NASA Astrophysics Data System (ADS)
Sarles, Stephen A.; Sundaresan, Vishnu B.; Leo, Donald J.
2007-09-01
Bilayer lipid membranes (BLMs) have been studied extensively due to functional and structural similarities to cell membranes, fostering research to understand ion-channel protein functions, measure bilayer mechanical properties, and identify self-assembly mechanisms. BLMs have traditionally been formed across single pores in substrates such as PTFE (Teflon). The incorporation of ion-channel proteins into the lipid bilayer enables the selective transfer of ions and fluid through the BLM. Processes of this nature have led to the measurement of ion current flowing across the lipid membrane and have been used to develop sensors that signal the presence of a particular reactant (glucose, urea, penicillin), improve drug recognition in cells, and develop materials capable of creating chemical energy from light. Recent research at Virginia Tech has shown that the incorporation of proton transporters in a supported BLM formed across an array of pores can convert chemical energy available in the adenosine triphosphate (ATP) into electricity. Experimental results from this work show that the system-named Biocell-is capable of developing 2µW/cm2 of membrane area with 15μl of ATPase. Efforts to increase the power output and conversion efficiency of this process while moving toward a packaged device present a unique engineering problem. The bilayer, as host to the active proton transporters, must therefore be formed evenly across a porous substrate, remain stable and yet fluid-like for protein interaction, and exhibit a large seal resistance. This article presents the ongoing work to characterize the Biocell using impedance analysis. Electrical impedance spectroscopy (EIS) is used to study the effect of adding ATPase proteins to POPS:POPE bilayer lipid membranes and correlate structural changes evident in the impedance data to the energy-conversion capability of various partial and whole Biocell assemblies. The specific membrane resistance of a pure BLM drops from 40-120kΩ•cm2 to only a few hundred Ω•cm2 upon reconstitution of ATPase proteins. Power characterization indicates that ATP hydrolysis may result in charging of the silver-silver chloride electrodes.
The disaccharide moiety of bleomycin facilitates uptake by cancer cells.
Schroeder, Benjamin R; Ghare, M Imran; Bhattacharya, Chandrabali; Paul, Rakesh; Yu, Zhiqiang; Zaleski, Paul A; Bozeman, Trevor C; Rishel, Michael J; Hecht, Sidney M
2014-10-01
The disaccharide moiety is responsible for the tumor cell targeting properties of bleomycin (BLM). While the aglycon (deglycobleomycin) mediates DNA cleavage in much the same fashion as bleomycin, it exhibits diminished cytotoxicity in comparison to BLM. These findings suggested that BLM might be modular in nature, composed of tumor-seeking and tumoricidal domains. To explore this possibility, BLM analogues were prepared in which the disaccharide moiety was attached to deglycobleomycin at novel positions, namely, via the threonine moiety or C-terminal substituent. The analogues were compared with BLM and deglycoBLM for DNA cleavage, cancer cell uptake, and cytotoxic activity. BLM is more potent than deglycoBLM in supercoiled plasmid DNA relaxation, while the analogue having the disaccharide on threonine was less active than deglycoBLM and the analogue containing the C-terminal disaccharide was slightly more potent. While having unexceptional DNA cleavage potencies, both glycosylated analogues were more cytotoxic to cultured DU145 prostate cancer cells than deglycoBLM. Dye-labeled conjugates of the cytotoxic BLM aglycons were used in imaging experiments to determine the extent of cell uptake. The rank order of internalization efficiencies was the same as their order of cytotoxicities toward DU145 cells. These findings establish a role for the BLM disaccharide in tumor targeting/uptake and suggest that the disaccharide moiety may be capable of delivering other cytotoxins to cancer cells. While the mechanism responsible for uptake of the BLM disaccharide selectively by tumor cells has not yet been established, data are presented which suggest that the metabolic shift to glycolysis in cancer cells may provide the vehicle for selective internalization.
43 CFR 2806.32 - How does BLM determine the population strata served?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false How does BLM determine the population... does BLM determine the population strata served? (a) BLM determines the population strata served as follows: (1) If the site or facility is within a designated RMA, BLM will use the population strata of the...
43 CFR 2806.32 - How does BLM determine the population strata served?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How does BLM determine the population... does BLM determine the population strata served? (a) BLM determines the population strata served as follows: (1) If the site or facility is within a designated RMA, BLM will use the population strata of the...
43 CFR 2806.32 - How does BLM determine the population strata served?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How does BLM determine the population... does BLM determine the population strata served? (a) BLM determines the population strata served as follows: (1) If the site or facility is within a designated RMA, BLM will use the population strata of the...
43 CFR 2806.32 - How does BLM determine the population strata served?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How does BLM determine the population... does BLM determine the population strata served? (a) BLM determines the population strata served as follows: (1) If the site or facility is within a designated RMA, BLM will use the population strata of the...
Airway transplantation of adipose stem cells protects against bleomycin-induced pulmonary fibrosis.
Llontop, Pedro; Lopez-Fernandez, Daniel; Clavo, Bernardino; Afonso Martín, Juan Luis; Fiuza-Pérez, María D; García Arranz, Mariano; Calatayud, Joaquín; Molins López-Rodó, Laureano; Alshehri, Khalid; Ayub, Adil; Raad, Wissam; Bhora, Faiz; Santana-Rodríguez, Norberto
2018-04-01
Idiopathic pulmonary fibrosis (IPF) is a progressive interstitial lung disease with poor prognosis. Adipose-derived stem cells (ADSC) have demonstrated regenerative properties in several tissues. The hypothesis of this study was that airway transplantation of ADSC could protect against bleomycin (BLM)-induced pulmonary fibrosis (PF). Fifty-eight lungs from 29 male Sprague-Dawley rats were analyzed. Animals were randomly divided into five groups: a) control (n=3); b) sham (n=6); c) BLM (n=6); d) BLM+ADSC-2d (n=6); and e) BLM+ADSC-14d (n=8). Animals received 500 µL saline (sham), 2.5 UI/kg BLM in 500 µL saline (BLM), and 2×10 6 ADSC in 100 µL saline intratracheally at 2 (BLM+ADSC-2d) and 14 days (BLM+ADSC-14d) after BLM. Animals were sacrificed at 28 days. Blinded Ashcroft score was used to determine pulmonary fibrosis extent on histology. Hsp27, Vegf, Nfkβ, IL-1, IL-6, Col4, and Tgfβ1 mRNA gene expression were determined using real-time quantitative-PCR. Ashcroft index was: control=0; sham=0.37±0.07; BLM=6.55±0.34 vs sham (P=0.006). BLM vs BLM+ADSC-2d=4.63±0.38 (P=0.005) and BLM+ADSC-14d=3.77±0.46 (P=0.005). BLM vs sham significantly increased Hsp27 (P=0.018), Nfkβ (P=0.009), Col4 (P=0.004), Tgfβ1 (P=0.006) and decreased IL-1 (P=0.006). BLM+ADSC-2d vs BLM significantly decreased Hsp27 (P=0.009) and increased Vegf (P=0.006), Nfkβ (P=0.009). BLM+ADSC-14d vs BLM significantly decreased Hsp27 (P=0.028), IL-6 (P=0.013), Col4 (P=0.002), and increased Nfkβ (P=0.040) and Tgfβ1 (P=0.002). Airway transplantation of ADSC significantly decreased the fibrosis rate in both early and established pulmonary fibrosis, modulating the expression of Hsp27, Vegfa, Nfkβ, IL-6, Col4, and Tgfβ1. From a translational perspective, this technique could become a new adjuvant treatment for patients with IPF. © American Federation for Medical Research (unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
Summary and findings of the 2006 BLM Forest Lands Report
Tim Bottomley; Jim Menlove
2009-01-01
In 2006, the Bureau of Land Management (BLM) contracted with the Forest Service Forest Inventory and Analysis Program (FIA) to assist in the preparation of a report specific to all forest lands under the administration of the BLM. The BLM requested that the FIA provide information on the extent and general conditions of BLM- managed forests and woodlands, within...
Neff, Norma F.; Ellis, Nathan A.; Ye, Tian Zhang; Noonan, James; Huang, Kelly; Sanz, Maureen; Proytcheva, Maria
1999-01-01
Bloom syndrome (BS) is a rare autosomal recessive disorder characterized by growth deficiency, immunodeficiency, genomic instability, and the early development of cancers of many types. BLM, the protein encoded by BLM, the gene mutated in BS, is localized in nuclear foci and absent from BS cells. BLM encodes a DNA helicase, and proteins from three missense alleles lack displacement activity. BLM transfected into BS cells reduces the frequency of sister chromatid exchanges and restores BLM in the nucleus. Missense alleles fail to reduce the sister chromatid exchanges in transfected BS cells or restore the normal nuclear pattern. BLM complements a phenotype of a Saccharomyces cerevisiae sgs1 top3 strain, and the missense alleles do not. This work demonstrates the importance of the enzymatic activity of BLM for its function and nuclear localization pattern. PMID:10069810
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-25
...The U.S. Department of Agriculture, Forest Service, Tongass National Forest will prepare a supplemental environmental impact statement (SEIS) to a 2008 programmatic environmental impact statement (PEIS) titled Geothermal Leasing in the Western United States. This analysis is needed for consent determination to allow the Bureau of Land Management (BLM) to issue three pending leases to a private geothermal developer. These leases encompass much of Bell Island and a portion of the Cleveland Peninsula on the adjacent mainland in the Alexander Archipelago of Southeast Alaska. The agency invites comments and suggestions on the scope of the analysis to be included in the draft SEIS. In addition, the agency gives notice of this environmental analysis and decision making process so that interested and affected people know how they may participate and contribute to the final decision.
BLM promotes the activation of Fanconi Anemia signaling pathway.
Panneerselvam, Jayabal; Wang, Hong; Zhang, Jun; Che, Raymond; Yu, Herbert; Fei, Peiwen
2016-05-31
Mutations in the human RecQ helicase, BLM, causes Bloom Syndrome, which is a rare autosomal recessive disorder and characterized by genomic instability and an increased risk of cancer. Fanconi Anemia (FA), resulting from mutations in any of the 19 known FA genes and those yet to be known, is also characterized by chromosomal instability and a high incidence of cancer. BLM helicase and FA proteins, therefore, may work in a common tumor-suppressor signaling pathway. To date, it remains largely unclear as to how BLM and FA proteins work concurrently in the maintenance of genome stability. Here we report that BLM is involved in the early activation of FA group D2 protein (FANCD2). We found that FANCD2 activation is substantially delayed and attenuated in crosslinking agent-treated cells harboring deficient Blm compared to similarly treated control cells with sufficient BLM. We also identified that the domain VI of BLM plays an essential role in promoting FANCD2 activation in cells treated with DNA crosslinking agents, especially ultraviolet B. The similar biological effects performed by ΔVI-BLM and inactivated FANCD2 further confirm the relationship between BLM and FANCD2. Mutations within the domain VI of BLM detected in human cancer samples demonstrate the functional importance of this domain, suggesting human tumorigenicity resulting from mtBLM may be at least partly attributed to mitigated FANCD2 activation. Collectively, our data show a previously unknown regulatory liaison in advancing our understanding of how the cancer susceptibility gene products act in concert to maintain genome stability.
Blm10 facilitates nuclear import of proteasome core particles
Weberruss, Marion H; Savulescu, Anca F; Jando, Julia; Bissinger, Thomas; Harel, Amnon; Glickman, Michael H; Enenkel, Cordula
2013-01-01
Short-lived proteins are degraded by proteasome complexes, which contain a proteolytic core particle (CP) but differ in the number of regulatory particles (RPs) and activators. A recently described member of conserved proteasome activators is Blm10. Blm10 contains 32 HEAT-like modules and is structurally related to the nuclear import receptor importin/karyopherin β. In proliferating yeast, RP-CP assemblies are primarily nuclear and promote cell division. During quiescence, RP-CP assemblies dissociate and CP and RP are sequestered into motile cytosolic proteasome storage granuli (PSG). Here, we show that CP sequestration into PSG depends on Blm10, whereas RP sequestration into PSG is independent of Blm10. PSG rapidly clear upon the resumption of cell proliferation and proteasomes are relocated into the nucleus. Thereby, Blm10 facilitates nuclear import of CP. Blm10-bound CP serves as an import receptor–cargo complex, as Blm10 mediates the interaction with FG-rich nucleoporins and is dissociated from the CP by Ran-GTP. Thus, Blm10 represents the first CP-dedicated nuclear import receptor in yeast. PMID:23982732
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-10-01
This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deepmore » hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This EIS reflects the public review of and comments offered on the draft statement. Included are descriptions of the characteristics of nuclear waste, the alternative disposal methods under consideration, and potential environmental impacts and costs of implementing these methods. Because of the programmatic nature of this document and the preliminary nature of certain design elements assumed in assessing the environmental consequences of the various alternatives, this study has been based on generic, rather than specific, systems. At such time as specific facilities are identified for particular sites, statements addressing site-specific aspects will be prepared for public review and comment.« less
Doherty, Kevin M.; Pride, Leah D.; Lukose, James; Snydsman, Brian E.; Charles, Ronald; Pramanik, Ajay; Muller, Eric G.; Botstein, David; Moore, Carol Wood
2012-01-01
Cytoprotective functions of a 20S proteasome activator were investigated. Saccharomyces cerevisiae Blm10 and human 20S proteasome activator 200 (PA200) are homologs. Comparative genome-wide analyses of untreated diploid cells lacking Blm10 and growing at steady state at defined growth rates revealed downregulation of numerous genes required for accurate chromosome structure, assembly and repair, and upregulation of a specific subset of genes encoding protein-folding chaperones. Blm10 loss or truncation of the Ubp3/Blm3 deubiquitinating enzyme caused massive chromosomal damage and cell death in homozygous diploids after phleomycin treatments, indicating that Blm10 and Ubp3/Blm3 function to stabilize the genome and protect against cell death. Diploids lacking Blm10 also were sensitized to doxorubicin, hydroxyurea, 5-fluorouracil, rapamycin, hydrogen peroxide, methyl methanesulfonate, and calcofluor. Fluorescently tagged Blm10 localized in nuclei, with enhanced fluorescence after DNA replication. After DNA damage that caused a classic G2/M arrest, fluorescence remained diffuse, with evidence of nuclear fragmentation in some cells. Protective functions of Blm10 did not require the carboxyl-terminal region that makes close contact with 20S proteasomes, indicating that protection does not require this contact or the truncated Blm10 can interact with the proteasome apart from this region. Without its carboxyl-terminus, Blm10(−339aa) localized to nuclei in untreated, nonproliferating (G0) cells, but not during G1 S, G2, and M. The results indicate Blm10 functions in protective mechanisms that include the machinery that assures proper assembly of chromosomes. These essential guardian functions have implications for ubiquitin-independent targeting in anticancer therapy. Targeting Blm10/PA200 together with one or more of the upregulated chaperones or a conventional treatment could be efficacious. PMID:22908043
Ke, Yuwen; Huh, Jae-Wan; Warrington, Ross; Li, Bing; Wu, Nan; Leng, Mei; Zhang, Junmei; Ball, Haydn L; Li, Bing; Yu, Hongtao
2011-01-01
Centromeres nucleate the formation of kinetochores and are vital for chromosome segregation during mitosis. The SNF2 family helicase PICH (Plk1-interacting checkpoint helicase) and the BLM (the Bloom's syndrome protein) helicase decorate ultrafine histone-negative DNA threads that link the segregating sister centromeres during anaphase. The functions of PICH and BLM at these threads are not understood, however. Here, we show that PICH binds to BLM and enables BLM localization to anaphase centromeric threads. PICH- or BLM-RNAi cells fail to resolve these threads in anaphase. The fragmented threads form centromeric-chromatin-containing micronuclei in daughter cells. Anaphase threads in PICH- and BLM-RNAi cells contain histones and centromere markers. Recombinant purified PICH has nucleosome remodelling activities in vitro. We propose that PICH and BLM unravel centromeric chromatin and keep anaphase DNA threads mostly free of nucleosomes, thus allowing these threads to span long distances between rapidly segregating centromeres without breakage and providing a spatiotemporal window for their resolution. PMID:21743438
DISTANT VIEW, BLM TACK SHED ON LEFT, BLM SEED SHED ...
DISTANT VIEW, BLM TACK SHED ON LEFT, BLM SEED SHED AT LEFT CENTER, FIRE DISPATCH OFFICES 1 AND 2 AT RIGHT CENTER, UTILITY BUILDING "B" ON RIGHT. VIEW TO SOUTHWEST. - Cedar City Automotive Repair Shop, 820 North Main Street, Cedar City, Iron County, UT
BLM and RMI1 alleviate RPA inhibition of TopoIIIα decatenase activity.
Yang, Jay; Bachrati, Csanad Z; Hickson, Ian D; Brown, Grant W
2012-01-01
RPA is a single-stranded DNA binding protein that physically associates with the BLM complex. RPA stimulates BLM helicase activity as well as the double Holliday junction dissolution activity of the BLM-topoisomerase IIIα complex. We investigated the effect of RPA on the ssDNA decatenase activity of topoisomerase IIIα. We found that RPA and other ssDNA binding proteins inhibit decatenation by topoisomerase IIIα. Complex formation between BLM, TopoIIIα, and RMI1 ablates inhibition of decatenation by ssDNA binding proteins. Together, these data indicate that inhibition by RPA does not involve species-specific interactions between RPA and BLM-TopoIIIα-RMI1, which contrasts with RPA modulation of double Holliday junction dissolution. We propose that topoisomerase IIIα and RPA compete to bind to single-stranded regions of catenanes. Interactions with BLM and RMI1 enhance toposiomerase IIIα activity, promoting decatenation in the presence of RPA.
43 CFR 2804.19 - How will BLM process my Processing Category 6 application?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How will BLM process my Processing... process my Processing Category 6 application? (a) For Processing Category 6 applications, you and BLM must enter into a written agreement that describes how BLM will process your application. The final agreement...
43 CFR 2804.19 - How will BLM process my Processing Category 6 application?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How will BLM process my Processing... process my Processing Category 6 application? (a) For Processing Category 6 applications, you and BLM must enter into a written agreement that describes how BLM will process your application. The final agreement...
Yen, Hsiu-Chuan; Li, Sin-Hua; Majima, Hideyuki J; Huang, Yu-Hsiang; Chen, Chiu-Ping; Liu, Chia-Chi; Tu, Ya-Chi; Chen, Chih-Wei
2011-06-01
Bleomycin (BLM) is an anti-cancer drug that can induce formation of reactive oxygen species (ROS). To investigate the association between up-regulation of antioxidant enzymes and coenzyme Q(10) (CoQ(10)) in acquired BLM resistance, one BLM-resistant clone, SBLM24 clone, was selected from a human oral cancer cell line, SCC61 clone. The BLM resistance of SBLM24 clone relative to a sub-clone of SCC61b cells was confirmed by analysis of clonogenic ability and cell cycle arrest. CoQ(10) levels and levels of Mn superoxide dismutase, glutathione peroxidase 1, catalase and thioredoxin reductase 1 were augmented in SBLM24 clone although there was also a mild increase in the expression of BLM hydrolase. Suppression of CoQ(10) levels by 4-aminobenzoate sensitized BLM-induced cytotoxicity. The results of suppression on enhanced ROS production by BLM and the cross-resistance to hydrogen peroxide in SBLM24 clone further demonstrated the development of adaptation to oxidative stress during the formation of acquired BLM resistance.
Interaction between the helicases genetically linked to Fanconi anemia group J and Bloom's syndrome
Suhasini, Avvaru N; Rawtani, Nina A; Wu, Yuliang; Sommers, Joshua A; Sharma, Sudha; Mosedale, Georgina; North, Phillip S; Cantor, Sharon B; Hickson, Ian D; Brosh, Robert M
2011-01-01
Bloom's syndrome (BS) and Fanconi anemia (FA) are autosomal recessive disorders characterized by cancer and chromosomal instability. BS and FA group J arise from mutations in the BLM and FANCJ genes, respectively, which encode DNA helicases. In this work, FANCJ and BLM were found to interact physically and functionally in human cells and co-localize to nuclear foci in response to replication stress. The cellular level of BLM is strongly dependent upon FANCJ, and BLM is degraded by a proteasome-mediated pathway when FANCJ is depleted. FANCJ-deficient cells display increased sister chromatid exchange and sensitivity to replication stress. Expression of a FANCJ C-terminal fragment that interacts with BLM exerted a dominant negative effect on hydroxyurea resistance by interfering with the FANCJ–BLM interaction. FANCJ and BLM synergistically unwound a DNA duplex substrate with sugar phosphate backbone discontinuity, but not an ‘undamaged' duplex. Collectively, the results suggest that FANCJ catalytic activity and its effect on BLM protein stability contribute to preservation of genomic stability and a normal response to replication stress. PMID:21240188
Smith, Kathleen S.; Ranville, James F.; Adams, M.; Choate, LaDonna M.; Church, Stan E.; Fey, David L.; Wanty, Richard B.; Crock, James G.
2006-01-01
The chemical speciation of metals influences their biological effects. The Biotic Ligand Model (BLM) is a computational approach to predict chemical speciation and acute toxicological effects of metals on aquatic biota. Recently, the U.S. Environmental Protection Agency incorporated the BLM into their regulatory water-quality criteria for copper. Results from three different laboratory copper toxicity tests were compared with BLM predictions for simulated test-waters. This was done to evaluate the ability of the BLM to accurately predict the effects of hardness and concentrations of dissolved organic carbon (DOC) and iron on aquatic toxicity. In addition, we evaluated whether the BLM and the three toxicity tests provide consistent results. Comparison of BLM predictions with two types of Ceriodaphnia dubia toxicity tests shows that there is fairly good agreement between predicted LC50 values computed by the BLM and LC50 values determined from the two toxicity tests. Specifically, the effect of increasing calcium concentration (and hardness) on copper toxicity appears to be minimal. Also, there is fairly good agreement between the BLM and the two toxicity tests for test solutions containing elevated DOC, for which the LC50 is 3-to-5 times greater (less toxic) than the LC50 for the lower-DOC test water. This illustrates the protective effects of DOC on copper toxicity and demonstrates the ability of the BLM to predict these protective effects. In contrast, for test solutions with added iron there is a decrease in LC50 values (increase in toxicity) in results from the two C. dubia toxicity tests, and the agreement between BLM LC50 predictions and results from these toxicity tests is poor. The inability of the BLM to account for competitive iron binding to DOC or DOC fractionation may be a significant shortcoming of the BLM for predicting site- specific water-quality criteria in streams affected by iron-rich acidic drainage in mined and mineralized areas.
Federal Black Lung Benefits Act
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stallsmith, W.P. Jr.
The basis for the filing of a civil action suit brought by a number of railroads against the Secretaries of Labor, Health and Human Services and the Treasury for declaratory and injunctive relief from certain provisions of the Federal Black Lung Benefit Act is set forth. The arguments that railroads are not liable for payment of benefits to their workers under this act hinge on the definition of the words transportation, miners, and coal mines and the intent of Congress when the act was drafted and enacted. It is also argued that benefits are available to railroad employees and theirmore » families under benefit plans other than the Black Lung Benefits Act. The chronology of the legal events surrounding the civil suit is set forth in some detail, and basically the logic of the article is strongly supportive of the railroads' position on the issue. (BLM)« less
43 CFR 2885.15 - How will BLM charge me rent?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How will BLM charge me rent? 2885.15 Section 2885.15 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... LEASING ACT Terms and Conditions of MLA Grants and TUPs § 2885.15 How will BLM charge me rent? (a) BLM...
43 CFR 2806.11 - How will BLM charge me rent?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How will BLM charge me rent? 2806.11 Section 2806.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... POLICY MANAGEMENT ACT Rents General Provisions § 2806.11 How will BLM charge me rent? (a) BLM will charge...
43 CFR 2806.11 - How will BLM charge me rent?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How will BLM charge me rent? 2806.11 Section 2806.11 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... POLICY MANAGEMENT ACT Rents General Provisions § 2806.11 How will BLM charge me rent? (a) BLM will charge...
43 CFR 2885.15 - How will BLM charge me rent?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How will BLM charge me rent? 2885.15 Section 2885.15 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... LEASING ACT Terms and Conditions of MLA Grants and TUPs § 2885.15 How will BLM charge me rent? (a) BLM...
43 CFR 3203.14 - How will BLM provide notice of a competitive lease sale?
Code of Federal Regulations, 2011 CFR
2011-10-01
... before conducting a competitive lease sale, BLM will post the Notice in the BLM office having... having jurisdiction over any of the included lands. (c) BLM may take other measures of notification for... sale; (3) Publishing notice in the newspaper; or (4) Posting the list of parcels on the Internet. ...
43 CFR 3217.14 - When will BLM approve my drilling or development contract?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false When will BLM approve my drilling or... RESOURCE LEASING Cooperative Agreements § 3217.14 When will BLM approve my drilling or development contract? BLM may approve a drilling or development contract when: (a) One or more geothermal lessees enter into...
43 CFR 3217.14 - When will BLM approve my drilling or development contract?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false When will BLM approve my drilling or... RESOURCE LEASING Cooperative Agreements § 3217.14 When will BLM approve my drilling or development contract? BLM may approve a drilling or development contract when: (a) One or more geothermal lessees enter into...
43 CFR 2884.17 - How will BLM process my Processing Category 6 application?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How will BLM process my Processing...-WAY UNDER THE MINERAL LEASING ACT Applying for MLA Grants or TUPs § 2884.17 How will BLM process my... written agreement that describes how BLM will process your application. The final agreement consists of a...
43 CFR 2884.17 - How will BLM process my Processing Category 6 application?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How will BLM process my Processing...-WAY UNDER THE MINERAL LEASING ACT Applying for MLA Grants or TUPs § 2884.17 How will BLM process my... written agreement that describes how BLM will process your application. The final agreement consists of a...
Calin, George; Ranzani, Guglielmina N; Amadori, Dino; Herlea, Vlad; Matei, Irina; Barbanti-Brodano, Giuseppe; Negrini, Massimo
2001-01-01
Background Genomic instability has been reported at microsatellite tracts in few coding sequences. We have shown that the Bloom syndrome BLM gene may be a target of microsatelliteinstability (MSI) in a short poly-adenine repeat located in its coding region. To further characterize the involvement of BLM in tumorigenesis, we have investigated mutations in nine genes containing coding microsatellites in microsatellite mutator phenotype (MMP) positive and negative gastric carcinomas (GCs). Methods We analyzed 50 gastric carcinomas (GCs) for mutations in the BLM poly(A) tract aswell as in the coding microsatellites of the TGFβ1-RII, IGFIIR, hMSH3, hMSH6, BAX, WRN, RECQL and CBL genes. Results BLM mutations were found in 27% of MMP+ GCs (4/15 cases) but not in any of the MMP negative GCs (0/35 cases). The frequency of mutations in the other eight coding regions microsatellite was the following: TGFβ1-RII (60 %), BAX (27%), hMSH6 (20%),hMSH3 (13%), CBL (13%), IGFIIR (7%), RECQL (0%) and WRN (0%). Mutations in BLM appear to be more frequently associated with frameshifts in BAX and in hMSH6and/or hMSH3. Tumors with BLM alterations present a higher frequency of unstable mono- and trinucleotide repeats located in coding regions as compared with mutator phenotype tumors without BLM frameshifts. Conclusions BLM frameshifts are frequent alterations in GCs specifically associated with MMP+tumors. We suggest that BLM loss of function by MSI may increase the genetic instability of a pre-existent unstable genotype in gastric tumors. PMID:11532193
Telomere and ribosomal DNA repeats are chromosomal targets of the bloom syndrome DNA helicase
Schawalder, James; Paric, Enesa; Neff, Norma F
2003-01-01
Background Bloom syndrome is one of the most cancer-predisposing disorders and is characterized by genomic instability and a high frequency of sister chromatid exchange. The disorder is caused by loss of function of a 3' to 5' RecQ DNA helicase, BLM. The exact role of BLM in maintaining genomic integrity is not known but the helicase has been found to associate with several DNA repair complexes and some DNA replication foci. Results Chromatin immunoprecipitation of BLM complexes recovered telomere and ribosomal DNA repeats. The N-terminus of BLM, required for NB localization, is the same as the telomere association domain of BLM. The C-terminus is required for ribosomal DNA localization. BLM localizes primarily to the non-transcribed spacer region of the ribosomal DNA repeat where replication forks initiate. Bloom syndrome cells expressing the deletion alleles lacking the ribosomal DNA and telomere association domains have altered cell cycle populations with increased S or G2/M cells relative to normal. Conclusion These results identify telomere and ribosomal DNA repeated sequence elements as chromosomal targets for the BLM DNA helicase during the S/G2 phase of the cell cycle. BLM is localized in nuclear bodies when it associates with telomeric repeats in both telomerase positive and negative cells. The BLM DNA helicase participates in genomic stability at ribosomal DNA repeats and telomeres. PMID:14577841
Intermittent Hypoxia Increases the Severity of Bleomycin-Induced Lung Injury in Mice.
Gille, Thomas; Didier, Morgane; Rotenberg, Cécile; Delbrel, Eva; Marchant, Dominique; Sutton, Angela; Dard, Nicolas; Haine, Liasmine; Voituron, Nicolas; Bernaudin, Jean-François; Valeyre, Dominique; Nunes, Hilario; Besnard, Valérie; Boncoeur, Emilie; Planès, Carole
2018-01-01
Severe obstructive sleep apnea (OSA) with chronic intermittent hypoxia (IH) is common in idiopathic pulmonary fibrosis (IPF). Here, we evaluated the impact of IH on bleomycin- (BLM-) induced pulmonary fibrosis in mice. C57BL/6J mice received intratracheal BLM or saline and were exposed to IH (40 cycles/hour; FiO 2 nadir: 6%; 8 hours/day) or intermittent air (IA). In the four experimental groups, we evaluated (i) survival; (ii) alveolar inflammation, pulmonary edema, lung oxidative stress, and antioxidant enzymes; (iii) lung cell apoptosis; and (iv) pulmonary fibrosis. Survival at day 21 was lower in the BLM-IH group ( p < 0.05). Pulmonary fibrosis was more severe at day 21 in BLM-IH mice, as assessed by lung collagen content ( p = 0.02) and histology. At day 4, BLM-IH mice developed a more severe neutrophilic alveolitis, ( p < 0.001). Lung oxidative stress was observed, and superoxide dismutase and glutathione peroxidase expression was decreased in BLM-IH mice ( p < 0.05 versus BLM-IA group). At day 8, pulmonary edema was observed and lung cell apoptosis was increased in the BLM-IH group. These results show that exposure to chronic IH increases mortality, lung inflammation, and lung fibrosis in BLM-treated mice. This study raises the question of the worsening impact of severe OSA in IPF patients.
43 CFR 3602.14 - What kind of financial security does BLM require?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What kind of financial security does BLM...? (a) For contracts of $2,000 or more, BLM will require a performance bond of an amount sufficient to... post a performance bond. (b) BLM may require a performance bond for contracts of less than $2,000. We...
43 CFR 3602.14 - What kind of financial security does BLM require?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What kind of financial security does BLM...? (a) For contracts of $2,000 or more, BLM will require a performance bond of an amount sufficient to... post a performance bond. (b) BLM may require a performance bond for contracts of less than $2,000. We...
43 CFR 3602.14 - What kind of financial security does BLM require?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What kind of financial security does BLM...? (a) For contracts of $2,000 or more, BLM will require a performance bond of an amount sufficient to... post a performance bond. (b) BLM may require a performance bond for contracts of less than $2,000. We...
43 CFR 3834.13 - Will BLM prorate annual maintenance or oil shale fees?
Code of Federal Regulations, 2012 CFR
2012-10-01
... FOR MINING CLAIMS OR SITES Fee Payment § 3834.13 Will BLM prorate annual maintenance or oil shale fees? BLM will not prorate annual maintenance or oil shale fees if you hold a mining claim or site for only... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Will BLM prorate annual maintenance or oil...
43 CFR 3834.13 - Will BLM prorate annual maintenance or oil shale fees?
Code of Federal Regulations, 2014 CFR
2014-10-01
... FOR MINING CLAIMS OR SITES Fee Payment § 3834.13 Will BLM prorate annual maintenance or oil shale fees? BLM will not prorate annual maintenance or oil shale fees if you hold a mining claim or site for only... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Will BLM prorate annual maintenance or oil...
43 CFR 3834.13 - Will BLM prorate annual maintenance or oil shale fees?
Code of Federal Regulations, 2013 CFR
2013-10-01
... FOR MINING CLAIMS OR SITES Fee Payment § 3834.13 Will BLM prorate annual maintenance or oil shale fees? BLM will not prorate annual maintenance or oil shale fees if you hold a mining claim or site for only... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Will BLM prorate annual maintenance or oil...
43 CFR 3834.13 - Will BLM prorate annual maintenance or oil shale fees?
Code of Federal Regulations, 2011 CFR
2011-10-01
... FOR MINING CLAIMS OR SITES Fee Payment § 3834.13 Will BLM prorate annual maintenance or oil shale fees? BLM will not prorate annual maintenance or oil shale fees if you hold a mining claim or site for only... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Will BLM prorate annual maintenance or oil...
Assessing the Potential for Renewable Energy on Public Lands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2003-02-01
This report represents an initial activity of the Bureau of Land Managements (BLM) proposed National Energy Policy Implementation Plan: identify and evaluate renewable energy resources on federal lands and any limitations on accessing them. Ultimately, BLM will prioritize land-use planning activities to increase industrys development of renewable energy resources. These resources include solar, biomass, geothermal, water, and wind energy. To accomplish this, BLM and the Department of Energys National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of renewable energy resources on BLM lands in the western United States. The objective of this collaboration was to identifymore » BLM planning units in the western states with the highest potential for private-sector development of renewable resources. The assessment resulted in the following findings: (1) 63 BLM planning units in nine western states have high potential for one or more renewable energy technologies; and (2) 20 BLM planning units in seven western states have high potential for power production from three or more renewable energy sources. This assessment report provides BLM with information needed to prioritize land-use planning activities on the basis of potential for the development of energy from renewable resources.« less
Influence of inhalation anesthetics on ion transport across a planar bilayer lipid membrane.
Hichiri, Kei; Shirai, Osamu; Kano, Kenji
2012-01-01
Ion transport from one aqueous phase (W1) to another (W2) across a planar bilayer lipid membrane (BLM) in the presence of inhalation anesthetics was electrochemically investigated. In the absence of inhalation anesthetics in the BLM system, no ion transport current flowed between W1 and W2 across the BLM. When inhalation anesthetics such as halothane, chloroform, diethyl ether and trichloroethylene were added to the two aqueous phases or the BLM, the ion transport current quite clearly appeared. When the ratio of the concentration of KCl or NaCl in W1 to that in W2 was varied, the zero current potential across the BLM was shifted. By considering the magnitude of the potential shift, we concluded that the ion transport current can be predominantly ascribed to the transport of Cl(-) across the BLM. Since the dielectric constants of these anesthetics are larger than that of the inner hydrophobic domain of the BLM, the concentration of hydrophilic electrolyte ions in the BLM increases with the increase in the dielectric constant of the inner hydrophobic domain caused by addition of these anesthetics. These situations lead to an increase in the ion permeability coefficient.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less
Implicit and Explicit Racial Attitudes Changed During Black Lives Matter.
Sawyer, Jeremy; Gampa, Anup
2018-07-01
Lab-based interventions have been ineffective in changing individuals' implicit racial attitudes for more than brief durations, and exposure to high-status Black exemplars like Obama has proven ineffective in shifting societal-level racial attitudes. Antiracist social movements, however, offer a potential societal-level alternative for reducing racial bias. Racial attitudes were examined before and during Black Lives Matter (BLM) and its high points of struggle with 1,369,204 participants from 2009 to 2016. After controlling for changes in participant demographics, overall implicit attitudes were less pro-White during BLM than pre-BLM, became increasingly less pro-White across BLM, and were less pro-White during most periods of high BLM struggle. Considering changes in implicit attitudes by participant race, Whites became less implicitly pro-White during BLM, whereas Blacks showed little change. Regarding explicit attitudes, Whites became less pro-White and Blacks became less pro-Black during BLM, each moving toward an egalitarian "no preference" position.
Bleomycin in Octaarginine-modified Fusogenic Liposomes Results in Improved Tumor Growth Inhibition
Koshkaryev, Alexander; Piroyan, Aleksandr; Torchilin, Vladimir P.
2012-01-01
Bleomycin (BLM) is an example of an anticancer drug that should be delivered into cytosol for its efficient therapeutic action. With this in mind, we developed octaarginine (R8)-modified fusogenic DOPE-liposomes (R8-DOPE-BLM). R8-modification dramatically increased (up to 50-fold) the cell-liposome interaction. R8-DOPE-liposomes were internalized via macropinocytosis and did not end up in the lysosomes. R8-DOPE-BLM led to a significantly stronger cell death and DNA damage in vitro relative to all controls. R8-DOPE-BLM demonstrated a prominent anticancer effect in the BALB/c mice bearing 4T1 tumors. Thus, R8-DOPE-BLM provided efficient intracellular delivery of BLM leading to strong tumor growth inhibition in vivo. PMID:22743614
A reusable device for electrochemical applications of hydrogel supported black lipid membranes.
Mech-Dorosz, Agnieszka; Heiskanen, Arto; Bäckström, Sania; Perry, Mark; Muhammad, Haseena B; Hélix-Nielsen, Claus; Emnéus, Jenny
2015-02-01
Black lipid membranes (BLMs) are significant in studies of membrane transport, incorporated proteins/ion transporters, and hence in construction of biosensor devices. Although BLMs provide an accepted mimic of cellular membranes, they are inherently fragile. Techniques are developed to stabilize them, such as hydrogel supports. In this paper, we present a reusable device for studies on hydrogel supported (hs) BLMs. These are formed across an ethylene tetrafluoroethylene (ETFE) aperture array supported by the hydrogel, which is during in situ polymerization covalently "sandwiched" between the ETFE substrate and a gold electrode microchip, thus allowing direct electrochemical studies with the integrated working electrodes. Using electrochemical impedance spectroscopy (EIS), X-ray photoelectron spectroscopy and contact angle measurements, we demonstrate the optimized chemical modifications of the gold electrode microchips and plasma modification of the ETFE aperture arrays facilitating covalent "sandwiching" of the hydrogel. Both fluorescence microscopy and EIS were used to demonstrate the induced spontaneous thinning of a deposited lipid solution, leading to formation of stabilized hsBLMs on average in 10 min. The determined specific membrane capacitance and resistance were shown to vary in the range 0.31-0.49 μF/cm(2) and 45-65 kΩ cm(2), respectively, corresponding to partially solvent containing BLMs with an average life time of 60-80 min. The characterized hsBLM formation and devised equivalent circuit models lead to a schematic model to illustrate lipid molecule distribution in hydrogel-supported apertures. The functionality of stabilized hsBLMs and detection sensitivity of the platform were verified by monitoring the effect of the ion transporter valinomycin.
Protective effect of dexpanthenol on bleomycin-induced pulmonary fibrosis in rats.
Ermis, Hilal; Parlakpinar, Hakan; Gulbas, Gazi; Vardi, Nigar; Polat, Alaadin; Cetin, Asli; Kilic, Talat; Aytemur, Zeynep Ayfer
2013-12-01
Despite extensive studies, there is no effective treatment currently available other than pirfenidone for idiopathic pulmonary fibrosis. A protective effect of pantothenic acid and its derivatives on cell damage produced by oxygen radicals has been reported, but it has not been tested in bleomycin (BLM)--induced pulmonary fibrosis in rats. Therefore, we aimed to investigate the preventive effect of dexpanthenol (Dxp) on pulmonary fibrosis. Thirty-two rats were assigned to four groups as follows: (1) control group, (2) dexpanthenol (Dxp) group; 500 mg/kg Dxp continued intraperitoneally for 14 days, (3) bleomycin (BLM) group; a single intratracheal injection of BLM (2.5 mg/kg body weight in 0.25-ml phosphate buffered saline), and (4) BLM + Dxp-treated group; 500 mg/kg Dxp was administered 1 h before the intratracheal BLM injection and continued for 14 days i.p. The histopathological grades of lung inflammation and collagen deposition, tissue levels of malondialdehyde (MDA), superoxide dismutase (SOD), catalase (CAT), glutathione peroxidase (GPx), and myeloperoxidase (MPO) were measured. BLM provoked inflammation and collagen deposition (p < 0.0001), with a marked increase in myeloperoxidase (MPO) activity resembling increased inflammatory activity (p < 0.0001), which was prevented by Dxp (p < 0.0001, p = 0.02). BLM reduced tissue activities of SOD, GPx, and CAT compared to controls (p = 0.01, 0.03, 0.009). MDA was increased with BLM (p = 0.003). SOD (p = 0.001) and MDA (p = 0.016) levels were improved in group 4. The CAT levels in the BLM + Dxp group were close to those in the control group (p > 0.05). We showed that Dxp significantly prevents BLM-induced lung fibrosis in rats. Further studies are required to evaluate the role of Dxp in the treatment of lung fibrosis.
Cho, Yoon Hee; Lee, Joong Won; Woo, Hae Dong; Lee, Sunyeong; Kim, Yang Jee; Lee, Younghyun; Shin, Sangah; Joung, Hyojee; Chung, Hai Won
2016-01-01
Following one of the world’s largest nuclear accidents, occured at Fukushima, Japan in 2011, a significant scientific effort has focused on minimizing the potential adverse health effects due to radiation exposure. The use of natural dietary antioxidants to reduce the risk of radiation-induced oxidative DNA damage is a simple strategy for minimizing radiation-related cancer rates and improving overall health. The onion is among the richest sources of dietary flavonoids and is an important food for increasing their overall intake. Therefore, we examined the effect of an onion extract on cyto- and geno-toxicity in human lymphocytes treated with bleomycin (BLM), a radiomimetic agent. In addition, we measured the frequency of micronuclei (MN) and DNA damage following treatment with BLM using a cytokinesis-blocked micronucleus assay and a single cell gel electrophoresis assay. We observed a significant increase in cell viability in lymphocytes treated with onion extract then exposed to BLM compared to cells treated with BLM alone. The frequency of BLM induced MN and DNA damage increased in a dose-dependent manner; however, when lymphocytes were pretreated with onion extract (10 and 20 μL/mL), the frequency of BLM-induced MN was decreased at all doses of BLM and DNA damage was decreased at 3 μg/mL of BLM. These results suggest that onion extract may have protective effects against BLM-induced cyto- and genotoxicity in human lymphocytes. PMID:26907305
Cho, Yoon Hee; Lee, Joong Won; Woo, Hae Dong; Lee, Sunyeong; Kim, Yang Jee; Lee, Younghyun; Shin, Sangah; Joung, Hyojee; Chung, Hai Won
2016-02-19
Following one of the world's largest nuclear accidents, occured at Fukushima, Japan in 2011, a significant scientific effort has focused on minimizing the potential adverse health effects due to radiation exposure. The use of natural dietary antioxidants to reduce the risk of radiation-induced oxidative DNA damage is a simple strategy for minimizing radiation-related cancer rates and improving overall health. The onion is among the richest sources of dietary flavonoids and is an important food for increasing their overall intake. Therefore, we examined the effect of an onion extract on cyto- and geno-toxicity in human lymphocytes treated with bleomycin (BLM), a radiomimetic agent. In addition, we measured the frequency of micronuclei (MN) and DNA damage following treatment with BLM using a cytokinesis-blocked micronucleus assay and a single cell gel electrophoresis assay. We observed a significant increase in cell viability in lymphocytes treated with onion extract then exposed to BLM compared to cells treated with BLM alone. The frequency of BLM induced MN and DNA damage increased in a dose-dependent manner; however, when lymphocytes were pretreated with onion extract (10 and 20 μL/mL), the frequency of BLM-induced MN was decreased at all doses of BLM and DNA damage was decreased at 3 μg/mL of BLM. These results suggest that onion extract may have protective effects against BLM-induced cyto- and genotoxicity in human lymphocytes.
Code of Federal Regulations, 2012 CFR
2012-10-01
... affected if the BLM land my grant or TUP encumbers is transferred to another Federal agency or out of... administration affected if the BLM land my grant or TUP encumbers is transferred to another Federal agency or out of Federal ownership? (a) If there is a proposal to transfer the BLM land your grant or TUP encumbers...
Code of Federal Regulations, 2011 CFR
2011-10-01
... affected if the BLM land my grant or TUP encumbers is transferred to another Federal agency or out of... administration affected if the BLM land my grant or TUP encumbers is transferred to another Federal agency or out of Federal ownership? (a) If there is a proposal to transfer the BLM land your grant or TUP encumbers...
Code of Federal Regulations, 2013 CFR
2013-10-01
... affected if the BLM land my grant or TUP encumbers is transferred to another Federal agency or out of... administration affected if the BLM land my grant or TUP encumbers is transferred to another Federal agency or out of Federal ownership? (a) If there is a proposal to transfer the BLM land your grant or TUP encumbers...
RECQ-like helicases Sgs1 and BLM regulate R-loop–associated genome instability
Chang, Emily Yun-Chia; Novoa, Carolina A.; Aristizabal, Maria J.; Coulombe, Yan; Segovia, Romulo; Shen, Yaoqing; Keong, Christelle; Tam, Annie S.; Jones, Steven J.M.; Masson, Jean-Yves; Kobor, Michael S.
2017-01-01
Sgs1, the orthologue of human Bloom’s syndrome helicase BLM, is a yeast DNA helicase functioning in DNA replication and repair. We show that SGS1 loss increases R-loop accumulation and sensitizes cells to transcription–replication collisions. Yeast lacking SGS1 accumulate R-loops and γ-H2A at sites of Sgs1 binding, replication pausing regions, and long genes. The mutation signature of sgs1Δ reveals copy number changes flanked by repetitive regions with high R-loop–forming potential. Analysis of BLM in Bloom’s syndrome fibroblasts or by depletion of BLM from human cancer cells confirms a role for Sgs1/BLM in suppressing R-loop–associated genome instability across species. In support of a potential direct effect, BLM is found physically proximal to DNA:RNA hybrids in human cells, and can efficiently unwind R-loops in vitro. Together, our data describe a conserved role for Sgs1/BLM in R-loop suppression and support an increasingly broad view of DNA repair and replication fork stabilizing proteins as modulators of R-loop–mediated genome instability. PMID:29042409
Dynamics of the DNA repair proteins WRN and BLM in the nucleoplasm and nucleoli.
Bendtsen, Kristian Moss; Jensen, Martin Borch; May, Alfred; Rasmussen, Lene Juel; Trusina, Ala; Bohr, Vilhelm A; Jensen, Mogens H
2014-11-01
We have investigated the mobility of two EGFP-tagged DNA repair proteins, WRN and BLM. In particular, we focused on the dynamics in two locations, the nucleoli and the nucleoplasm. We found that both WRN and BLM use a "DNA-scanning" mechanism, with rapid binding-unbinding to DNA resulting in effective diffusion. In the nucleoplasm WRN and BLM have effective diffusion coefficients of 1.62 and 1.34 μm(2)/s, respectively. Likewise, the dynamics in the nucleoli are also best described by effective diffusion, but with diffusion coefficients a factor of ten lower than in the nucleoplasm. From this large reduction in diffusion coefficient we were able to classify WRN and BLM as DNA damage scanners. In addition to WRN and BLM we also classified other DNA damage proteins and found they all fall into one of two categories. Either they are scanners, similar to WRN and BLM, with very low diffusion coefficients, suggesting a scanning mechanism, or they are almost freely diffusing, suggesting that they interact with DNA only after initiation of a DNA damage response.
Combined cytogenotoxic effects of bee venom and bleomycin on rat lymphocytes: an in vitro study.
Abd-Elhakim, Yasmina M; Khalil, Samah R; Awad, Ashraf; Al-Ayadhi, Laila Y
2014-01-01
This study was carried out to determine the cytotoxic and genotoxic effects of bee venom (BV) and/or the chemotherapeutic agent bleomycin (BLM) on healthy isolated rat lymphocytes utilizing morphometric and molecular techniques. Using the Ficoll-Histopaque density gradient centrifugation technique, lymphocytes were isolated, divided into groups, and subjected to BV and/or BLM at incubation medium concentrations of 10 or 20 μg/mL respectively for 24 and 72 hrs. An MTT assay and fluorescent microscopy examinations were used to assess the cytotoxic effects. To determine the predominant type of BV and/or BLM-induced cell death, LDH release assay was employed beside quantitative expression analyses of the apoptosis-related genes (Caspase-3 and Bcl-2). The genotoxic effects of the tested compounds were evaluated via DNA fragmentation assay. The results of these assays demonstrated that BV potentiates BLM-induced cytotoxicity through increased LDH release and diminished cell viability. Nevertheless, BV significantly inhibited the BLM-induced DNA damage. The results verify that BV significantly attenuates the genotoxic effects of BLM on noncancerous isolated rat lymphocytes but does not diminish BLM cytotoxicity.
RECQ-like helicases Sgs1 and BLM regulate R-loop-associated genome instability.
Chang, Emily Yun-Chia; Novoa, Carolina A; Aristizabal, Maria J; Coulombe, Yan; Segovia, Romulo; Chaturvedi, Richa; Shen, Yaoqing; Keong, Christelle; Tam, Annie S; Jones, Steven J M; Masson, Jean-Yves; Kobor, Michael S; Stirling, Peter C
2017-12-04
Sgs1, the orthologue of human Bloom's syndrome helicase BLM, is a yeast DNA helicase functioning in DNA replication and repair. We show that SGS1 loss increases R-loop accumulation and sensitizes cells to transcription-replication collisions. Yeast lacking SGS1 accumulate R-loops and γ-H2A at sites of Sgs1 binding, replication pausing regions, and long genes. The mutation signature of sgs1 Δ reveals copy number changes flanked by repetitive regions with high R-loop-forming potential. Analysis of BLM in Bloom's syndrome fibroblasts or by depletion of BLM from human cancer cells confirms a role for Sgs1/BLM in suppressing R-loop-associated genome instability across species. In support of a potential direct effect, BLM is found physically proximal to DNA:RNA hybrids in human cells, and can efficiently unwind R-loops in vitro. Together, our data describe a conserved role for Sgs1/BLM in R-loop suppression and support an increasingly broad view of DNA repair and replication fork stabilizing proteins as modulators of R-loop-mediated genome instability. © 2017 Chang et al.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Laws § 3715.7-1 What types of enforcement action can BLM take if I do not meet the requirements of this... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What types of enforcement action can BLM... necessary to protect health, safety or the environment. (2) BLM will presume that health, safety or the...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Laws § 3715.7-1 What types of enforcement action can BLM take if I do not meet the requirements of this... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What types of enforcement action can BLM... necessary to protect health, safety or the environment. (2) BLM will presume that health, safety or the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Laws § 3715.7-1 What types of enforcement action can BLM take if I do not meet the requirements of this... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What types of enforcement action can BLM... necessary to protect health, safety or the environment. (2) BLM will presume that health, safety or the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Laws § 3715.7-1 What types of enforcement action can BLM take if I do not meet the requirements of this... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What types of enforcement action can BLM... necessary to protect health, safety or the environment. (2) BLM will presume that health, safety or the...
Electrochemical characterization of bilayer lipid membrane-semiconductor junctions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhao, Xiao Kang; Baral, S.; Fendler, J.H.
Three different systems of glyceryl monooleate (GMO), bilayer lipid membrane (BLM) supported semiconductor particles have been prepared and characterized. A single composition of particulate semiconductor deposited only on one side of the BLM constituted system A, two different compositions of particulate semiconductors sequentially deposited on the same side of the BLM represented system B, and two different compositions of particulate semiconductors deposited on the opposite sides of the BLM made up system C.
Yang, Hong-Mei; Sun, Chao-Yue; Liang, Jia-Li; Xu, Lie-Qiang; Zhang, Zhen-Biao; Luo, Dan-Dan; Chen, Han-Bin; Huang, Yong-Zhong; Wang, Qi; Lee, David Yue-Wei; Yuan, Jie; Li, Yu-Cui
2017-01-01
Bleomycin (BLM), a family of anti-tumor drugs, was reported to exhibit severe side effects limiting its usage in clinical treatment. Therefore, finding adjuvants that enhance the anti-tumor effect and reduce the detrimental effect of BLM is a prerequisite. Chrysanthemum indicum, an edible flower, possesses abundant bioactivities; the supercritical-carbon dioxide fluid extract from flowers and buds of C. indicum (CISCFE) have strong anti-inflammatory, anti-oxidant, and lung protective effects. However, the role of CISCFE combined with BLM treatment on tumor-bearing mice remains unclear. The present study aimed to investigate the potential synergistic effect and the underlying mechanism of CISCFE combined with BLM in the treatment of hepatoma 22 (H22) tumor-bearing mice. The results suggested that the oral administration of CISCFE combined with BLM could markedly prolong the life span, attenuate the BLM-induced pulmonary fibrosis, suppress the production of pro-inflammatory cytokines (interleukin-6), tumor necrosis factor-α, activities of myeloperoxidase, and malondiadehyde. Moreover, CISCFE combined with BLM promoted the ascites cell apoptosis, the activities of caspases 3 and 8, and up-regulated the protein expression of p53 and down-regulated the transforming growth factor-β1 by activating the gene expression of miR-29b. Taken together, these results indicated that CISCFE could enhance the anti-cancer activity of BLM and reduce the BLM-induced pulmonary injury in H22 tumor-bearing mice, rendering it as a potential adjuvant drug with chemotherapy after further investigation in the future. PMID:28245556
Watanabe, Tomoya; Mlakar, Logan; Heywood, Jonathan; Malaab, Maya; Hoffman, Stanley
2017-01-01
The murine bleomycin (BLM)-induced fibrosis model is the most widely used in systemic sclerosis (SSc) studies. It has been reported that systemic delivery of BLM via continuous diffusion from subcutaneously implanted osmotic minipumps can cause fibrosis of the skin, lungs, and other internal organs. However, the mouse strain, dosage of BLM, administration period, and additional important features differ from one report to the next. In this study, by employing the pump model in C57BL/6J mice, we show a dose-dependent increase in lung fibrosis by day 28 and a transient increase in dermal thickness. Dermal thickness and the level of collagen in skin treated with high-dose BLM was significantly higher than in skin treated with low dose BLM or vehicle. A reduction in the thickness of the adipose layer was noted in both high and low dose groups at earlier time points suggesting that the loss of the fat layer precedes the onset of fibrosis. High-dose BLM also induced dermal fibrosis and increased expression of fibrosis-associated genes ex vivo in human skin, thus confirming and extending the in vivo findings, and demonstrating that a human organ culture model can be used to assess the effect of BLM on skin. In summary, our findings suggest that the BLM pump model is an attractive model to analyze the underlying mechanisms of fibrosis and test the efficacy of potential therapies. However, the choice of mouse strain, duration of BLM administration and dose must be carefully considered when using this model. PMID:28651005
Watanabe, Tomoya; Nishimoto, Tetsuya; Mlakar, Logan; Heywood, Jonathan; Malaab, Maya; Hoffman, Stanley; Feghali-Bostwick, Carol
2017-01-01
The murine bleomycin (BLM)-induced fibrosis model is the most widely used in systemic sclerosis (SSc) studies. It has been reported that systemic delivery of BLM via continuous diffusion from subcutaneously implanted osmotic minipumps can cause fibrosis of the skin, lungs, and other internal organs. However, the mouse strain, dosage of BLM, administration period, and additional important features differ from one report to the next. In this study, by employing the pump model in C57BL/6J mice, we show a dose-dependent increase in lung fibrosis by day 28 and a transient increase in dermal thickness. Dermal thickness and the level of collagen in skin treated with high-dose BLM was significantly higher than in skin treated with low dose BLM or vehicle. A reduction in the thickness of the adipose layer was noted in both high and low dose groups at earlier time points suggesting that the loss of the fat layer precedes the onset of fibrosis. High-dose BLM also induced dermal fibrosis and increased expression of fibrosis-associated genes ex vivo in human skin, thus confirming and extending the in vivo findings, and demonstrating that a human organ culture model can be used to assess the effect of BLM on skin. In summary, our findings suggest that the BLM pump model is an attractive model to analyze the underlying mechanisms of fibrosis and test the efficacy of potential therapies. However, the choice of mouse strain, duration of BLM administration and dose must be carefully considered when using this model.
Yang, Hong-Mei; Sun, Chao-Yue; Liang, Jia-Li; Xu, Lie-Qiang; Zhang, Zhen-Biao; Luo, Dan-Dan; Chen, Han-Bin; Huang, Yong-Zhong; Wang, Qi; Lee, David Yue-Wei; Yuan, Jie; Li, Yu-Cui
2017-02-24
Bleomycin (BLM), a family of anti-tumor drugs, was reported to exhibit severe side effects limiting its usage in clinical treatment. Therefore, finding adjuvants that enhance the anti-tumor effect and reduce the detrimental effect of BLM is a prerequisite. Chrysanthemum indicum , an edible flower, possesses abundant bioactivities; the supercritical-carbon dioxide fluid extract from flowers and buds of C. indicum (CI SCFE ) have strong anti-inflammatory, anti-oxidant, and lung protective effects. However, the role of CI SCFE combined with BLM treatment on tumor-bearing mice remains unclear. The present study aimed to investigate the potential synergistic effect and the underlying mechanism of CI SCFE combined with BLM in the treatment of hepatoma 22 (H22) tumor-bearing mice. The results suggested that the oral administration of CI SCFE combined with BLM could markedly prolong the life span, attenuate the BLM-induced pulmonary fibrosis, suppress the production of pro-inflammatory cytokines (interleukin-6), tumor necrosis factor-α, activities of myeloperoxidase, and malondiadehyde. Moreover, CI SCFE combined with BLM promoted the ascites cell apoptosis, the activities of caspases 3 and 8, and up-regulated the protein expression of p53 and down-regulated the transforming growth factor-β1 by activating the gene expression of miR-29b. Taken together, these results indicated that CI SCFE could enhance the anti-cancer activity of BLM and reduce the BLM-induced pulmonary injury in H22 tumor-bearing mice, rendering it as a potential adjuvant drug with chemotherapy after further investigation in the future.
43 CFR 3836.25 - What if BLM denies my petition for deferment of assessment work?
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ANNUAL ASSESSMENT WORK REQUIREMENTS FOR MINING CLAIMS Deferring Assessment Work § 3836.25 What if BLM... BLM decision denying the petition in which to pay the maintenance fee to maintain your claim. ...
43 CFR 3836.25 - What if BLM denies my petition for deferment of assessment work?
Code of Federal Regulations, 2012 CFR
2012-10-01
...) ANNUAL ASSESSMENT WORK REQUIREMENTS FOR MINING CLAIMS Deferring Assessment Work § 3836.25 What if BLM... BLM decision denying the petition in which to pay the maintenance fee to maintain your claim. ...
43 CFR 3836.25 - What if BLM denies my petition for deferment of assessment work?
Code of Federal Regulations, 2014 CFR
2014-10-01
...) ANNUAL ASSESSMENT WORK REQUIREMENTS FOR MINING CLAIMS Deferring Assessment Work § 3836.25 What if BLM... BLM decision denying the petition in which to pay the maintenance fee to maintain your claim. ...
43 CFR 3836.25 - What if BLM denies my petition for deferment of assessment work?
Code of Federal Regulations, 2013 CFR
2013-10-01
...) ANNUAL ASSESSMENT WORK REQUIREMENTS FOR MINING CLAIMS Deferring Assessment Work § 3836.25 What if BLM... BLM decision denying the petition in which to pay the maintenance fee to maintain your claim. ...
43 CFR 3261.18 - Do I need to file a bond with BLM before I build a well pad or drill a well?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Do I need to file a bond with BLM before I...) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.18 Do I need to file a bond with BLM before I build a well pad or drill a well? Before starting any operation, you must: (a) File with BLM...
2007-03-01
Traffic Control Assigned Airspace ATG Adversary Tactics Group AWACS Airborne Warning and Control System BAQ Bureau of Air Quality BLM Bureau of Land...Department of Interior Actions BLM The BLM manages millions of acres of public lands in southern Nevada which include portions of NTTR and...within NTTR and would not affect BLM lands adjacent to the base. Therefore, there are no cumulative impacts. USFWS Aircraft operate within the
BLM helicase facilitates RNA polymerase I-mediated ribosomal RNA transcription
Grierson, Patrick M.; Lillard, Kate; Behbehani, Gregory K.; Combs, Kelly A.; Bhattacharyya, Saumitri; Acharya, Samir; Groden, Joanna
2012-01-01
Bloom's syndrome (BS) is an autosomal recessive disorder that is invariably characterized by severe growth retardation and cancer predisposition. The Bloom's syndrome helicase (BLM), mutations of which lead to BS, localizes to promyelocytic leukemia protein bodies and to the nucleolus of the cell, the site of RNA polymerase I-mediated ribosomal RNA (rRNA) transcription. rRNA transcription is fundamental for ribosome biogenesis and therefore protein synthesis, cellular growth and proliferation; its inhibition limits cellular growth and proliferation as well as bodily growth. We report that nucleolar BLM facilitates RNA polymerase I-mediated rRNA transcription. Immunofluorescence studies demonstrate the dependance of BLM nucleolar localization upon ongoing RNA polymerase I-mediated rRNA transcription. In vivo protein co-immunoprecipitation demonstrates that BLM interacts with RPA194, a subunit of RNA polymerase I. 3H-uridine pulse-chase assays demonstrate that BLM expression is required for efficient rRNA transcription. In vitro helicase assays demonstrate that BLM unwinds GC-rich rDNA-like substrates that form in the nucleolus and normally inhibit progression of the RNA polymerase I transcription complex. These studies suggest that nucleolar BLM modulates rDNA structures in association with RNA polymerase I to facilitate RNA polymerase I-mediated rRNA transcription. Given the intricate relationship between rDNA metabolism and growth, our data may help in understanding the etiology of proportional dwarfism in BS. PMID:22106380
BLM helicase facilitates RNA polymerase I-mediated ribosomal RNA transcription.
Grierson, Patrick M; Lillard, Kate; Behbehani, Gregory K; Combs, Kelly A; Bhattacharyya, Saumitri; Acharya, Samir; Groden, Joanna
2012-03-01
Bloom's syndrome (BS) is an autosomal recessive disorder that is invariably characterized by severe growth retardation and cancer predisposition. The Bloom's syndrome helicase (BLM), mutations of which lead to BS, localizes to promyelocytic leukemia protein bodies and to the nucleolus of the cell, the site of RNA polymerase I-mediated ribosomal RNA (rRNA) transcription. rRNA transcription is fundamental for ribosome biogenesis and therefore protein synthesis, cellular growth and proliferation; its inhibition limits cellular growth and proliferation as well as bodily growth. We report that nucleolar BLM facilitates RNA polymerase I-mediated rRNA transcription. Immunofluorescence studies demonstrate the dependance of BLM nucleolar localization upon ongoing RNA polymerase I-mediated rRNA transcription. In vivo protein co-immunoprecipitation demonstrates that BLM interacts with RPA194, a subunit of RNA polymerase I. (3)H-uridine pulse-chase assays demonstrate that BLM expression is required for efficient rRNA transcription. In vitro helicase assays demonstrate that BLM unwinds GC-rich rDNA-like substrates that form in the nucleolus and normally inhibit progression of the RNA polymerase I transcription complex. These studies suggest that nucleolar BLM modulates rDNA structures in association with RNA polymerase I to facilitate RNA polymerase I-mediated rRNA transcription. Given the intricate relationship between rDNA metabolism and growth, our data may help in understanding the etiology of proportional dwarfism in BS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Cheng-Fan, E-mail: zhouchengfan@sohu.com; Department of Occupational Health and Environmental Health, School of Public Health, Anhui Medical University, Hefei, Anhui 230032; Zhou, Deng-Chuan
Epithelial–mesenchymal transition (EMT) derived myofibroblasts are partly responsible for the increased collagen synthesis and deposition that occur in tissue fibrosis; however EMT occurrence in skin fibrosis and its mechanism remain unknown. The aim of this study was to investigate whether epithelial cells undergo EMT and determine the role of oxidative stress in this process. BALB/c mice were subcutaneously injected with bleomycin (BLM) or phosphate buffer saline (PBS) into the shaved back daily for 2, 3, and 4 weeks. Skin collagen deposition was evaluated by histopathology and Western blotting. EMT characteristics in the skin were determined by histopathology and immunofluorescent stainingmore » for E-cadherin and vimentin, which were further evaluated by Western blotting and reverse transcriptase polymerase chain reaction (RT-PCR). To investigate the role of oxidative stress in EMT, the antioxidant N-acetylcysteine (NAC) was intraperitoneally (100 mg/kg body weight/day) injected daily for 3 weeks. The epithelial suprabasal cells were detached from the basement membrane zone (BMZ) in the sclerotic skin treated with BLM. Immunofluorescent staining indicated vimentin-positive epithelial cells frequently occurring in the thickened epidermis of BLM-treated mice. Western blotting and RT-PCR showed that the expression of E-cadherin was significantly decreased but that of vimentin significantly increased in the skin treated with BLM. NAC attenuated BLM induced oxidative damage, changes in E-cadherin and vimentin expressions and collagen deposition in the sclerotic skin of mice. This study provides the first evidence that BLM induces the EMT of the epithelial cells superficial to the basement membrane zone in the skin fibrosis. Oxidative stress may contribute, at least in part, to BLM induced EMT and skin fibrosis in mice. - Highlights: • We provided the first evidence that EMT occurred in BLM-induced skin fibrosis. • Epithelial cells superficial to the BMZ underwent EMT in BLM-induced skin fibrosis. • NAC attenuated EMT induction in the process of BLM-induced skin fibrosis. • NAC didn't significantly inhibit TGF-β expression in BLM-induced skin fibrosis.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the publicmore » involvement process is the Comment Report which follows in part of this volume on Public Involvement.« less
Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1992-04-01
The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line optionsmore » would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.« less
Combined Cytogenotoxic Effects of Bee Venom and Bleomycin on Rat Lymphocytes: An In Vitro Study
Abd-Elhakim, Yasmina M.; Khalil, Samah R.; Awad, Ashraf; AL-Ayadhi, Laila Y.
2014-01-01
This study was carried out to determine the cytotoxic and genotoxic effects of bee venom (BV) and/or the chemotherapeutic agent bleomycin (BLM) on healthy isolated rat lymphocytes utilizing morphometric and molecular techniques. Using the Ficoll-Histopaque density gradient centrifugation technique, lymphocytes were isolated, divided into groups, and subjected to BV and/or BLM at incubation medium concentrations of 10 or 20 μg/mL respectively for 24 and 72 hrs. An MTT assay and fluorescent microscopy examinations were used to assess the cytotoxic effects. To determine the predominant type of BV and/or BLM-induced cell death, LDH release assay was employed beside quantitative expression analyses of the apoptosis-related genes (Caspase-3 and Bcl-2). The genotoxic effects of the tested compounds were evaluated via DNA fragmentation assay. The results of these assays demonstrated that BV potentiates BLM-induced cytotoxicity through increased LDH release and diminished cell viability. Nevertheless, BV significantly inhibited the BLM-induced DNA damage. The results verify that BV significantly attenuates the genotoxic effects of BLM on noncancerous isolated rat lymphocytes but does not diminish BLM cytotoxicity. PMID:24822179
Bloom DNA Helicase Facilitates Homologous Recombination between Diverged Homologous Sequences*
Kikuchi, Koji; Abdel-Aziz, H. Ismail; Taniguchi, Yoshihito; Yamazoe, Mitsuyoshi; Takeda, Shunichi; Hirota, Kouji
2009-01-01
Bloom syndrome caused by inactivation of the Bloom DNA helicase (Blm) is characterized by increases in the level of sister chromatid exchange, homologous recombination (HR) associated with cross-over. It is therefore believed that Blm works as an anti-recombinase. Meanwhile, in Drosophila, DmBlm is required specifically to promote the synthesis-dependent strand anneal (SDSA), a type of HR not associating with cross-over. However, conservation of Blm function in SDSA through higher eukaryotes has been a matter of debate. Here, we demonstrate the function of Blm in SDSA type HR in chicken DT40 B lymphocyte line, where Ig gene conversion diversifies the immunoglobulin V gene through intragenic HR between diverged homologous segments. This reaction is initiated by the activation-induced cytidine deaminase enzyme-mediated uracil formation at the V gene, which in turn converts into abasic site, presumably leading to a single strand gap. Ig gene conversion frequency was drastically reduced in BLM−/− cells. In addition, BLM−/− cells used limited donor segments harboring higher identity compared with other segments in Ig gene conversion event, suggesting that Blm can promote HR between diverged sequences. To further understand the role of Blm in HR between diverged homologous sequences, we measured the frequency of gene targeting induced by an I-SceI-endonuclease-mediated double-strand break. BLM−/− cells showed a severer defect in the gene targeting frequency as the number of heterologous sequences increased at the double-strand break site. Conversely, the overexpression of Blm, even an ATPase-defective mutant, strongly stimulated gene targeting. In summary, Blm promotes HR between diverged sequences through a novel ATPase-independent mechanism. PMID:19661064
Ellis, N A; Ciocci, S; Proytcheva, M; Lennon, D; Groden, J; German, J
1998-01-01
Bloom syndrome (BS) is more frequent in the Ashkenazic Jewish population than in any other. There the predominant mutation, referred to as "blmAsh," is a 6-bp deletion and 7-bp insertion at nucleotide position 2281 in the BLM cDNA. Using a convenient PCR assay, we have identified blmAsh on 58 of 60 chromosomes transmitted by Ashkenazic parents to persons with BS. In contrast, in 91 unrelated non-Ashkenazic persons with BS whom we examined, blmAsh was identified only in 5, these coming from Spanish-speaking Christian families from the southwestern United States, Mexico, or El Salvador. These data, along with haplotype analyses, show that blmAsh was independently established through a founder effect in Ashkenazic Jews and in immigrants to formerly Spanish colonies. This striking observation underscores the complexity of Jewish history and demonstrates the importance of migration and genetic drift in the formation of human populations. PMID:9837821
Yilmaz, Dilek; Teksoy, Ozgun; Bilaloglu, Rahmi; Çinkilic, Nilufer
2016-01-01
Naringin is a flavonoid found in grapefruit and other citrus fruits that shows antioxidant activity. The aim of the present study was to determine the anti-genotoxic and protective effects of naringin on the chemotherapeutic/radiomimetic agent bleomycin (BLM) in human blood lymphocyte cultures in vitro using micronucleus test and chromosomal aberrations (CA) assay. We tested the three doses of naringin (1, 2, 3 µg/mL) and a single dose of BLM (20 µg/mL). BLM significantly increased the total CAs and micronucleus frequency at a concentration of 20 µg/mL. Naringin did not show any toxicity in doses of 1, 2, and 3 µg/mL. Combined treatments of BLM and naringin (2 and 3 µg/mL) significantly reduced micronucleus formation. Naringin dose-dependently decreased the total chromosome aberrations frequency induced by BLM. These results indicate that naringin could prevent BLM (20 µg/mL)-induced genotoxicity.
Khan, Farhan R; Keller, W Bill; Yan, Norman D; Welsh, Paul G; Wood, Chris M; McGeer, James C
2012-02-07
Using a 30-year record of biological and water chemistry data collected from seven lakes near smelters in Sudbury (Ontario, Canada) we examined the link between reductions of Cu, Ni, and Zn concentrations and zooplankton species richness. The toxicity of the metal mixtures was assessed using an additive Toxic Unit (TU) approach. Four TU models were developed based on total metal concentrations (TM-TU); free ion concentrations (FI-TU); acute LC50s calculated from the Biotic Ligand Model (BLM-TU); and chronic LC50s (acute LC50s adjusted by metal-specific acute-to-chronic ratios, cBLM-TU). All models significantly correlated reductions in metal concentrations to increased zooplankton species richness over time (p < 0.01) with a rank based on r(2) values of cBLM-TU > BLM-TU = FI-TU > TM-TU. Lake-wise comparisons within each model showed that the BLM-TU and cBLM-TU models provided the best description of recovery across all seven lakes. These two models were used to calculate thresholds for chemical and biological recovery using data from reference lakes in the same region. A threshold value of TU = 1 derived from the cBLM-TU provided the most accurate description of recovery. Overall, BLM-based TU models that integrate site-specific water chemistry-derived estimates of toxicity offer a useful predictor of biological recovery.
Stream and River Condition Across the BLM's National System of Public Lands
Meeting Abstract: The Bureau of Land Management (BLM), in collaboration with the U.S. Environmental Protection Agency, conducted the first ever Western Rivers and Streams Assessment (WRSA), a survey of the condition of BLM streams and rivers throughout the contiguous western U.S...
43 CFR 2802.11 - How does BLM designate corridors?
Code of Federal Regulations, 2013 CFR
2013-10-01
... air, water, soil, fish, wildlife, and vegetation; (3) Physical effects and constraints on corridor... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How does BLM designate corridors? 2802.11... POLICY MANAGEMENT ACT Lands Available for FLPMA Grants § 2802.11 How does BLM designate corridors? (a...
43 CFR 2802.11 - How does BLM designate corridors?
Code of Federal Regulations, 2012 CFR
2012-10-01
... air, water, soil, fish, wildlife, and vegetation; (3) Physical effects and constraints on corridor... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How does BLM designate corridors? 2802.11... POLICY MANAGEMENT ACT Lands Available for FLPMA Grants § 2802.11 How does BLM designate corridors? (a...
43 CFR 2802.11 - How does BLM designate corridors?
Code of Federal Regulations, 2011 CFR
2011-10-01
... air, water, soil, fish, wildlife, and vegetation; (3) Physical effects and constraints on corridor... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How does BLM designate corridors? 2802.11... POLICY MANAGEMENT ACT Lands Available for FLPMA Grants § 2802.11 How does BLM designate corridors? (a...
76 FR 30739 - Notice of Public Meeting, Salem District Resource Advisory Committee Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-26
.... ADDRESSES: BLM Salem District Office, 1717 Fabry Road, SE., Salem, OR 97306. FOR FURTHER INFORMATION CONTACT... Hatfield, BLM Salem District Designated Official, 1717 Fabry Road, SE., Salem, OR 97306--(503) 375-5682... quality, land health, forest ecosystems, and infrastructure. Miles R. Brown, BLM Salem District Manager...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... available areas is online at http://www.blm.gov/ak . DATES: BLM-Alaska must receive all nominations and...-Alaska Web site at http://www.blm.gov/ak . Authority: 43 CFR 3131.2. Bud Cribley, State Director. [FR Doc...
Stream and River Condition Across the BLM's National System of Public Lands.
The Bureau of Land Management (BLM), in collaboration with the U.S. Environmental Protection Agency, conducted the first ever Western Rivers and Streams Assessment (WRSA), a survey of the condition of BLM streams and rivers throughout the contiguous western U.S. The WRSA was desi...
43 CFR 3602.42 - How does BLM publicize competitive mineral materials sales?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false How does BLM publicize competitive mineral... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINERAL MATERIALS DISPOSAL Mineral Materials Sales Competitive Sales § 3602.42 How does BLM publicize competitive...