Sample records for draft eis usfs

  1. 77 FR 49792 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ....epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 08/06/2012 Through..., Comment Period Ends: 10/01/2012, Contact: Brian Hasselbach 406-441-3908. EIS No. 20120266, Draft EIS, USFS... Ends: 10/01/2012, Contact: Harold Dyer 719-852-6215. EIS No. 20120267, Draft EIS, USN, VA, Outdoor...

  2. 75 FR 58376 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Seastrand 626-574-5278. EIS No. 20100378, Draft Supplement, USFS, OR, North Fork Burnt River Mining Project.... 20100380, Final EIS, USACE, 00, Sabine-Neches Waterway Channel Improvement Project, Proposed Ocean Dredged...

  3. 75 FR 72823 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... Register. EIS No. 20100449, Draft EIS, USFS, MT, Stillwater Mining Revised Water Management Plans and BOE... and Reuse, Implementation, Brunswick, ME, Wait Period Ends: 12/27/2010, Contact: Thomas Stephan 215...

  4. 77 FR 60986 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    .../2012, Contact: Liana Liu 360-753-9553. EIS No. 20120312, Final EIS, USFS, NV, Geothermal Leasing on the Humboldt-Toiyabe National Forest, To Facilitate the Development and Production of Geothermal Energy, Ely..., Contact: Jerald Weaver 360-378-2223. EIS No. 20120314, Draft EIS, WAPA, WY, Hermosa West Wind Energy...

  5. 76 FR 59125 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    .... Markham 805-585-2150. EIS No. 20110317, Draft EIS, USFS, MT, Lonesome Wood Vegetation Management 2 Project... the 2006 FEIS Analysis and to Correct the Deficiencies that the Meister Panel Identified, Land and...

  6. 78 FR 53754 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... Everglades Planning Project, Comment Period Ends: 10/15/2013, Contact: Gretchen Ehlinger 904 232-1682. EIS No. 20130251, Final EIS, USFS, MN, BWCAW Non-native Invasive Plant Management Project, Review Period Ends: 10... Project, Comment Period Ends: 10/15/2013, Contact: Pete Gomben 801-999-2182. EIS No. 20130255, Draft EIS...

  7. 77 FR 4318 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-27

    ..., Clearwater National Forest Travel Planning Project, Proposes to Manage Motorized and Mechanized Travel.../2012, Contact: Heather Berg (208) 476-4541. EIS No. 20120014, Revised Draft EIS, USFS, MT, East Deer Lodge Valley Landscape Restoration Management Project, To Conduct Landscape Restoration Management...

  8. 76 FR 78252 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ..., Rubicon Trail Easement and Resource Improvement Project, Construction and Operation, Right-of-Way Grant...: Andrea Catanzaro (409) 766-6346 EIS No. 20110421, Draft EIS, USFS, CA, Greys Mountain Ecological...--La Crosse Transmission System Improvement Project, Proposed Construction and Operation of a 345...

  9. 78 FR 16500 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... and Vegetation Management Project, Comment Period Ends: 04/29/2013, Contact: Marcy Anderson 541-419-0517. EIS No. 20130062, Draft EIS, USFS, NM, Roca Honda Mine Project, Exploration and Mine Development... Seco Riparian Sanctuary Unit Restoration and Pumping Plant/Fish Screen Facility Protection Project...

  10. 76 FR 75543 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Profile Zones (DFPZs), Lassen National Forest, Almanor Ranger District, Plumas County, CA, Comment Period... Treatment Activities, Updated and New Information, Idaho Panhandle National Forests, Priest Lake Ranger... (937) 257-5899. EIS No. 20110403, Draft EIS, USFS, CA, Creeks II Forest Restoration Project, Proposal...

  11. 77 FR 9652 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... Road-Related Impacts to Wildlife, Fish, Soil, and Water Resources and Restoration of 2010 Forest Plan..., Amendment 18A to the Fishery Management Plan for the Snapper-Grouper Fishery of the South Atlantic Region...-9235. EIS No. 20120034, Draft EIS, USFS, CA, Harris Vegetation Management Project, To Improve Forest...

  12. 76 FR 82296 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    .... 20110431, Draft EIS, USFS, NV, Geothermal Leasing on the Humboldt-Toiyabe National Forest, To Facilitate the Development and Production of Geothermal Energy, Ely, Austin, Tonopah and Bridgeport Ranger...

  13. 75 FR 36386 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ..., Revised Draft EIS, USFS, 00, Uinta National Forest Oil and Gas Leasing, Implementation, Identify National Forest Systems Lands with Federal Mineral Rights, Wasatch, Utah, Juab, Tooele, and Sanpete Counties, UT...

  14. 75 FR 68355 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... District Olympic National Forest, Olympic National Park, Jefferson County, WA, Wait Period Ends: 12/06/2010...: Lynne Urquhart 334-274-6371. EIS No. 20100431, Final EIS, USFS, WA, Dosewallips Road Washout Project, To...: 12/20/2010, Contact: Amy Henry 865-632-4045. EIS No. 20100433, Final EIS, USFS, CA, Plumas National...

  15. 77 FR 11109 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ...-Native Plant Control Project, Proposes a Forest-Wide Integrated Management Strategy to Control the Spread..., Final EIS, USFS, SD, Steamboat Project, Proposes to Implement Multiple Resource Management Actions... EIS, USFS, WA, South George Vegetation and Fuels Management Project, To Improve Forest Health and...

  16. 76 FR 19772 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... Barker 208-735-2072. EIS No. 20110101, Final EIS, USFS, CO, Big Moose Vegetation Management Project... Salvage Project, Proposal to Treat Timer Harvest, Prescribe Fire, and Mechanical Thinning, Uinta-Wasatch... No. 20110107, Final EIS, FHWA, IL, Illinois 336 Corridor Project, (Federal Aid Primary Route 315...

  17. 78 FR 59677 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ..., Designation of the Atchafalaya River Bar Channel Ocean Dredged Material Disposal Site, Review Period Ends: 10.../2013, Contact: Paul Bradford 406-293-6211. EIS No. 20130282, Final EIS, USFS, WY, Clinker Mining...

  18. 75 FR 33299 - Environmental Impacts Statements; Notice Of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ...-963-0182. EIS No. 20100215, Final EIS, USFS, CO, Hermosa Park/Mitchell Lakes Land Exchange Project.../2010 to 07/ 26/2010. Dated: June 8, 2010. Ken Mittelholtz, Deputy Director, NEPA Compliance Division...

  19. 75 FR 56979 - Central Electric Power Cooperative, Inc.: Notice of Intent To Hold a Public Scoping Meeting and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... issue a special use permit for the proposal. RUS is the lead agency conducting the EIS, and the USFS... refined as part of the EIS scoping process and will be addressed in the EIS. Public health and safety, environmental impacts, and engineering aspects of the proposal will be considered in the EIS. RUS is the lead...

  20. 77 FR 19281 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ..., FL, Central and Southern Florida Project, Broward County Water Preserve Areas, Updates Resulting from Policy Changes that occurred since 2007 Civil Works Board Approval, South Florida Water Management... for this project. EIS No. 20120089, Final EIS, USFS, CA, Greys Mountain Ecological Restoration Project...

  1. 32 CFR 989.19 - Draft EIS.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...

  2. 32 CFR 989.19 - Draft EIS.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...

  3. 32 CFR 989.19 - Draft EIS.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...

  4. 75 FR 21625 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ...: Christopher Worthington 775-635-4000. EIS No. 20100136, Final EIS, USFS, 00, Nebraska National Forests and..., Buffalo Gap National Grassland, Oglala National Grassland, Samuel R. McKelvie National Forest, and the Pine Ridge and Bessey Units of the Nebraska National Forest, Fall River, Custer, Pennington, Jackson...

  5. 10 CFR 501.65 - Publication of notice of availability of draft EIS.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Publication of notice of availability of draft EIS. 501.65... SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon...

  6. 10 CFR 501.65 - Publication of notice of availability of draft EIS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Publication of notice of availability of draft EIS. 501.65... SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon...

  7. 10 CFR 501.65 - Publication of notice of availability of draft EIS.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Publication of notice of availability of draft EIS. 501.65... SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon...

  8. 10 CFR 501.65 - Publication of notice of availability of draft EIS.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Publication of notice of availability of draft EIS. 501.65... SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon...

  9. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... Management Plan (EIS/GMP) for Fort Raleigh National Historic Site, North Carolina. The draft describes and... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http...

  10. 76 FR 21401 - Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ...] Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM AGENCY... prepared a Draft Environmental Impact Statement (EIS) for the HB In- Situ Solution Mine Project, and by... considered, the BLM must receive written comments on the HB In-Situ Solution Mine Project Draft EIS within 60...

  11. 10 CFR 1021.213 - Rulemaking.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... comments, as part of the administrative record (40 CFR 1505.1(c)). (d) If an EIS is required, DOE will normally publish the draft EIS at the time it publishes the proposed rule (40 CFR 1502.5(d)). DOE will... draft EIS under § 1021.313 of this part. The draft EIS need not accompany notices of inquiry or advance...

  12. 75 FR 30849 - Notice of Availability of Draft General Management Plan/Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... Impact Statement (GMP/EIS) for Lincoln Home National Historic Site, Illinois. DATES: The draft GMP/EIS... meetings will be held during the 60-day review period on the GMP/EIS in Springfield, Illinois, in summer... the draft GMP/EIS are available from the Superintendent, 413 South Eighth Street, Springfield...

  13. 77 FR 132 - General Management Plan and Environmental Impact Statement for Lincoln Home National Historic Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...: The Abbreviated Final General Management Plan and Environmental Impact Statement (GMP/EIS) will remain... Site. SUPPLEMENTARY INFORMATION: We, the National Park Service, prepared a draft GMP/EIS for the park... summaries of the draft GMP/EIS. In addition to the distribution, the draft GMP/EIS was also made available...

  14. 7 CFR 1794.72 - Adoption of an EIS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) ENVIRONMENTAL POLICIES AND PROCEDURES Adoption of Environmental Documents § 1794.72... portion of the EIS as a part of its draft EIS. The circulation and notice provisions for a draft and final... agency's EIS is adequate, RUS shall adopt that agency's EIS as its final EIS. RUS and the applicant shall...

  15. 7 CFR 1794.72 - Adoption of an EIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Adoption of an EIS. 1794.72 Section 1794.72... Adoption of an EIS. (a) Where RUS determines that an existing Federal EIS requires additional information... portion of the EIS as a part of its draft EIS. The circulation and notice provisions for a draft and final...

  16. 7 CFR 1794.62 - Supplemental EIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Supplemental EIS. 1794.62 Section 1794.62 Agriculture... Supplemental EIS. (a) A supplement to a draft or final EIS shall be prepared, circulated, and given notice by RUS and the applicant in the same manner (exclusive of scoping) as a draft and final EIS (see § 1794...

  17. 10 CFR 501.65 - Publication of notice of availability of draft EIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Publication of notice of availability of draft EIS. 501.65 Section 501.65 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS ADMINISTRATIVE PROCEDURES AND SANCTIONS Exemptions and Certifications § 501.65 Publication of notice of availability of draft EIS. A...

  18. 75 FR 16786 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... EIS, BLM, CA, Palen Solar Power Plant Project, Construction, Operation and Decommission a Solar... No. 20100107, Draft EIS, BLM, CA, Calico Solar Project, Proposed Solar Thermal Electricity Generation... 04/02/2010. EIS No. 20100054, Draft EIS, NASA, VA, Wallops Flight Facility, Shoreline Restoration and...

  19. 78 FR 45190 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ...: David Libman 404-507-5701. EIS No. 20130220, Draft EIS, NPS, OH, Cuyahoga Valley National Park White.... 20130176, Draft EIS, APHIS, TX, Cattle Fever Tick Eradication Program--Tick Control Barrier, Comment Period...

  20. 75 FR 13268 - Extension of the Public Comment Period for the Draft Tank Closure and Waste Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Management Environmental Impact Statement for the Hanford Site, Richland, WA AGENCY: Department of Energy... Statement for the Hanford Site, Richland, Washington (Draft EIS, DOE/EIS-00391), made available for public... Draft EIS is also available through the Hanford Web site at: http://www.hanford.gov/orp . Issued in...

  1. 16 CFR 1021.9 - Public participation, notice, and comment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...: (1) Promptly after a decision is made to prepare a draft EIS, a notice of intent to prepare the draft EIS shall be published in the CPSC Public Calendar and in the Federal Register. The notice shall state... draft EIS, a notice of its availability for comment should be published in the CPSC Public Calendar and...

  2. 78 FR 67187 - Notice of Availability of the Draft General Management Plan/Wilderness Study/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic Riverways (Riverways) in Missouri. DATES: The Draft GMP/WS/EIS will remain available for public review and... U.S. Environmental Protection Agency. ADDRESSES: Copies of the Draft GMP/WS/EIS will be available to...

  3. 78 FR 20883 - Tonto National Forest; Arizona; Salt River Allotments Vegetative Management EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ...The Tonto National Forest hereby gives notice that it is extending the public comment period for the Salt River Allotments Vegetative Management Draft Environmental Impact Statement (Draft EIS), which was published in the Federal Register on February 22, 2013, (Volume 78, No. 36) originally for a 45-day comment period. Please see the Notice of Availability of the Draft EIS (78 FR 12310) for more detailed information related to the Salt River Allotments Vegetative Management Draft EIS. In response to requests for additional time, the Forest Service will extend the comment period from April 8, 2013, to May 8, 2013. Federal, State, tribal, and local governments and other interested parties are requested to comment on the Draft EIS. Comments will be accepted by email to [email protected] or by mail to Debbie Cress, Tonto National Forest, 2324 E. McDowell Rd., Phoenix, AZ 85006 (928) 595-2093 or faxed to (602) 225-5295.

  4. 78 FR 17662 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ..., Bell Island Geothermal Leases, Review Period Ends: 04/22/2013, Contact: Sarah Samuelson 907- 789-6274... 571-256-2783. EIS No. 20130067, Draft EIS, WAPA, ND, Wilton IV Wind Energy Center, Comment Period Ends...-9553. EIS No. 20130070, Draft EIS, WAPA, USFWS, 00, PROGRAMMATIC--Upper Great Plains Wind Energy...

  5. 78 FR 17653 - Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS-0408)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... infrastructure development, including siting wind turbines, access roads, underground collector lines, overhead... Wildlife Service Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS... Plains Wind Energy Draft Programmatic Environmental Impact Statement (Draft [[Page 17654

  6. 77 FR 62215 - Extension of the Comment Period: The Village at Wolf Creek Access Project Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... DEPARTMENT OF AGRICULTURE Forest Service Extension of the Comment Period: The Village at Wolf Creek Access Project Draft Environmental Impact Statement AGENCY: Forest Service, USDA. ACTION... (USFS), Rio Grande National Forest announces the extension of the comment period for the Village at Wolf...

  7. 76 FR 72718 - Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ....HAG11-0127] Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact... Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Baker... conditions, and changes in resource management practices since the Baker RMP of 1989. The Draft RMP/EIS was...

  8. 75 FR 78980 - Notice of Availability of the Draft Programmatic Environmental Impact Statement for Solar Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ...] Notice of Availability of the Draft Programmatic Environmental Impact Statement for Solar Energy... Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern... preferred method of commenting. Mail: Addressed to: Solar Energy Draft Programmatic EIS, Argonne National...

  9. 75 FR 19992 - Notice of Availability of the Supplemental Draft Environmental Impact Statement for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Statement for the Proposed Ivanpah Solar Electric Generation System Project, San Bernardino County, CA... Notice of Availability of the Draft Ivanpah Solar Electric Generation System EIS and the Draft California... prepared a Supplemental Draft Environmental Impact Statement (EIS) for the Proposed Ivanpah Solar Electric...

  10. 78 FR 65622 - Notice of Availability for the Draft Environmental Impact Statement and Announcement of Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... DEPARTMENT OF ENERGY [OE Docket No. PP-362] Notice of Availability for the Draft Environmental.... SUMMARY: The U.S. Department of Energy (DOE) announces the availability of the ``Draft Environmental... EIS. The Draft EIS evaluates the environmental impacts of DOE's proposed Federal action of issuing a...

  11. 78 FR 41057 - Sabine River Authority of Texas and Sabine River Authority, State of Louisiana; Public Meetings...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... the Draft Environmental Impact Statement for the Toledo Bend Hydroelectric Project On May 17, 2013, the Commission issued a Draft Environmental Impact Statement (draft EIS) for the Toledo Bend Hydroelectric Project No 2105-036 (Toledo Bend Project). The draft EIS documents the views of governmental...

  12. Phase 2 fuel efficiency standards for medium- and heavy-duty engines and vehicles : draft EIS.

    DOT National Transportation Integrated Search

    2015-06-01

    This Draft Environmental Impact Statement (Draft EIS) analyzes the environmental impacts of fuel : efficiency standards and reasonable alternative standards for model years 2018 and beyond for medium- : and heavy- duty engines and vehicles that NHTSA...

  13. 75 FR 8936 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... Notices EIS No. 20090421, Draft EIS, NRC, WY, Moore Ranch In-Situ Uranium Recovery (ISR) Project, Proposal to Construct, Operate, Conduct Aquifer Restoration, and Decommission an In-Situ Recovery (ISR... No. 20090423, Draft EIS, NRC, WY, Nichols Ranch In-Situ Uranium Recovery (ISR) Project, Proposal to...

  14. 78 FR 48672 - Environmental Impacts Statements;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Bend Vegetation Management Project, Review Period Ends: 09/19/2013, Contact: Beth Peer 541-383- 4769... Supplement, USFS, ID, Salmon-Challis National Forest Travel Planning and OHV Designation Project, Comment... Mine Project, Comment Period Ends: 09/23/2013, Contact: Shiva Achet 575-234-5924 EIS No. 20130235...

  15. 75 FR 18204 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    .... 20100108, Draft EIS, BLM, AZ, Sonoran Solar Energy Project, Construction and Operation of a 3756-megawatt (MW) Concentrated Solar Thermal Power Plant and Ancillary Facilities on 3,702 Acres, Right-of- Way..., Contact: Louis Moore 916-978-5106. EIS No. 20100111, Draft EIS, BLM, CA, Ridgecrest Solar Power Project...

  16. 23 CFR 771.129 - Re-evaluations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RELATED PROCEDURES § 771.129 Re-evaluations. (a) A written evaluation of the draft EIS shall be prepared by the applicant in cooperation with the Administration if an acceptable final EIS is not submitted to the Administration within three years from the date of the draft EIS circulation. The purpose of...

  17. 75 FR 6018 - Environmental Management Site-Specific Advisory Board, Hanford

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... in the Draft Tank Closure (TC) and Waste Management (WM) Environmental Impact Statement (EIS) Overview of the Draft TC and WM EIS findings by other stakeholder groups Discussion of HAB member comments on the TC and WM EIS Development of HAB advice principles Adjourn Public Participation: The meeting...

  18. 78 FR 35087 - Office of Commercial Space Transportation; Notice of Extension of Comment Period for the Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Transportation; Notice of Extension of Comment Period for the Draft Environmental Impact Statement for the SpaceX... Notice of Availability (NOA) for the FAA's Draft Environmental Impact Statement for the SpaceX Texas... regarding the Draft EIS to Ms. Stacey M. Zee, FAA Environmental Specialist, SpaceX EIS c/o Cardno TEC Inc...

  19. 78 FR 76140 - Extension of Public Comment Period for the Champlain Hudson Power Express Transmission Line...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ... Transmission Line Project Draft Environmental Impact Statement AGENCY: Department of Energy. ACTION: Extension... comment period for the Champlain Hudson Power Express Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0447). The Draft EIS evaluates the environmental impacts of DOE's proposed Federal action...

  20. 77 FR 53221 - Santa Clara Valley Habitat Conservation Plan/Natural Community Conservation Plan, Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... review. The EIS was updated to address the comments received on the 2010 Draft EIS. We are considering... burrowing owl (Athene cunicularia hypugaea), tricolored blackbird (Agelaius tricolor), Mount Hamilton... received on the Draft EIR/ EIS and our responses to those comments. Following a 30-day review period, we...

  1. 76 FR 10583 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... No. 20110048, Draft EIS, DOE, 00, Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste, Proposed Development, Operation, and Long-Term Management of a Disposal Facility... Period Ends: 03/28/2011, Contact: Cody Wheeler 816-389-3739. EIS No. 20110051, Draft EIS, USN, CA, Marine...

  2. 75 FR 11881 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ..., Draft EIS, BLM, CA, Stirling Energy Systems (SES) Solar 2 Project, Construct and Operate, Electric.../2010: Correction to Comment Period from 04/12/2010 to 04/26/2010. EIS No. 20100054, Draft EIS, NASA, VA... FR Notice Published 02/26/2010: Correction to Document Agency from NOAA to NASA. Dated: March 9, 2010...

  3. 23 CFR 771.123 - Draft environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Notice of Intent, the lead agencies, in cooperation with the applicant (if not a lead agency), will begin... at the local level. (c) The draft EIS shall be prepared by the lead agencies, in cooperation with the applicant (if not a lead agency). The draft EIS shall evaluate all reasonable alternatives to the action and...

  4. 23 CFR 771.123 - Draft environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Notice of Intent, the lead agencies, in cooperation with the applicant (if not a lead agency), will begin... at the local level. (c) The draft EIS shall be prepared by the lead agencies, in cooperation with the applicant (if not a lead agency). The draft EIS shall evaluate all reasonable alternatives to the action and...

  5. 77 FR 51527 - Notice of Extension of Public Comment Period for the Draft Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... be considered, all comments on the Draft EIS must be received by September 27, 2012. The DoN will... (DoN) is extending the public comment period for the Draft Environmental Impact Statement (EIS) for the Proposed Modernization and Expansion of Townsend Bombing Range (TBR), Georgia (GA) until September...

  6. 76 FR 70979 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Point Thomson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... times and locations: 05 December 2011 Anchorage, AK Open House 4-6 p.m. Loussac Library........ Public... Draft EIS: The Draft EIS is available for review at the following public libraries and schools: a. Harold Kaveolook School, Kaktovik, AK b. Nuiqsut Trapper School, Nuiqsut, AK c. Tuzzy Consortium Library...

  7. 75 FR 4801 - Notice of Availability of the Draft Long-Term Management and Storage of Elemental Mercury...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... to do so. During the first hour, the public may review information materials and speak informally... Elemental Mercury Environmental Impact Statement and Notice of Public Hearings AGENCY: Department of Energy...-0423D, ``Draft Mercury Storage EIS'' or ``Draft EIS'') for public review and comment during a public...

  8. 10 CFR 1021.313 - Public review of environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) The public review and comment period on a DOE draft EIS shall be no less than 45 days (40 CFR 1506.10... the Federal Register. (b) DOE shall hold at least one public hearing on DOE draft EISs. Such public... draft EIS and include the location, date, and time of the public hearings. (c) DOE shall prepare a final...

  9. 32 CFR Appendix C to Part 989 - Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued..., App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...

  10. 32 CFR Appendix C to Part 989 - Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued..., App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...

  11. 75 FR 9188 - Intent To Prepare a Draft Environmental Impact Statement for the Everglades Restoration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... evaluation of relevant new species information and hydrological data. The ERTP Draft EIS will evaluate the... alternative and actual data collected since the May 2002 FEIS. The IOP was intended to be continued until the... agency in the preparation of the Draft EIS. The Corps is in close coordination with the FWS. The Corps...

  12. 75 FR 5626 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA INT-DES...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... of Availability of the Draft Environmental Impact Statement (Draft EIS) and Announcement of Public..., cultural, and socioeconomic effects of the proposed alternatives. DATES: Written comments on the Draft EIS will be accepted through March 22, 2010. A public information meeting will be held from 5 p.m. to 7 p.m...

  13. 75 FR 37431 - Pacific Gas & Electric Co.; Notice of Public Meeting on Draft Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ...-Cow Creek Hydroelectric Project (FERC Project No. 606-027). In addition to or in lieu of sending... comments on the Draft EIS. The time and location of this public meeting is as follows: Kilarc-Cow Creek... application for the Kilarc-Cow Creek Project. The Draft EIS was issued and publicly noticed on June 22, 2010...

  14. 76 FR 14968 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    .... 20110076, Draft Supplement, USFS, MT, Grizzly Vegetation and Transportation Management Project, Updated and... Management Actions, Three Rivers Ranger District, Kootenai National Forest, Lincoln County, MT, Comment..., Section 30 Limestone Mining Project, Proposal to Implement Mining Actions, Mystic Ranger District, Black...

  15. 77 FR 4360 - Notice of Availability of the Draft Environmental Impact Statement for the Hycroft Mine Expansion...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-27

    ... comments related to the Hycroft Mine Expansion Draft EIS by any of the following methods: Web site: www.blm..., Nevada 89445, Attn. Kathleen Rehberg. Copies of the Hycroft Mine Expansion Draft EIS are available in the... hours. The FIRS is available 24 hours a day, 7 days a week, to leave a message or question with the...

  16. 76 FR 45554 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    .... 20110231, Final EIS, BLM, NV, Salt Wells Energy Projects, Proposal for Three Separate Geothermal Energy and.... EIS No. 20110241, Draft EIS, NNSA, NV, Site-Wide EIS--Continued Operation of the Department of Energy...

  17. 77 FR 31355 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ...: https://cdx.epa.gov . EIS No. 20120157, Final EIS, FTA, GA, Tier 1--Atlanta Beltline City of Atlanta..., Review Period Ends: 06/ 25/2012, Contact: Brian Smart 404-865-5600. EIS No. 20120158, Draft EIS, USACE...

  18. 75 FR 76447 - Notice of Intent to Prepare a Draft Environmental Impact Statement (EIS), Initiate the Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... Draft Environmental Impact Statement (EIS), Initiate the Public Scoping Period and Host Public Scoping Meetings for the Great Lakes and Mississippi River Interbasin Study (``GLMRIS''); Correction, Clarification... international commerce, travel and local practices, ANS have been introduced throughout the Mississippi River...

  19. 76 FR 76389 - Notice of Public Meeting on the Draft Environmental Impact Statement for Basewide Water...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ... involve the construction, operation, and maintenance of infrastructure upgrades, expansions, and... Road over the Santa Margarita River (Stuart Mesa Bridge). A Notice of Intent to prepare this EIS was... Road, Fallbrook, California 92028. A copy of the Draft EIS will be made available upon written request...

  20. 77 FR 36573 - DRAFT General Management Plan and Draft Environmental Impact Statement, Fort Matanzas National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Statement (EIS) for the General Management Plan (GMP) for Fort Matanzas National Monument (Monument... EIS/GMP describes the NPS preferred alternative--Alternative B--to guide the management of the... prescriptions to ensure protection, access and enjoyment of the Monument's resources. An up-to-date GMP is...

  1. 33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Draft EIS C Appendix C to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. C Appendix C to Part 230... commanders: Department of Defense Corps of Engineer, Department of the Army, 3710-XX (Use Local Billing Code...

  2. 75 FR 58369 - Intent To Prepare a Draft Environmental Impact Statement for the North Branch Ecorse Creek, Flood...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Environmental Impact Statement for the North Branch Ecorse Creek, Flood Risk Management General Reevaluation... Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement (EIS) for flood risk management... flood risk management measures. The GRR/EIS is being completed in partnership with Wayne County, MI. The...

  3. 76 FR 75554 - Notice of Availability of the Draft Environmental Impact Statement for the Mount Hope Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Environmental Impact Statement for the Mount Hope Project, Eureka County, NV AGENCY: Bureau of Land Management... Impact Statement (EIS) for the Mount Hope Project and by this notice is announcing the opening of the... Mount Hope Project Draft EIS within 90 days following the date the Environmental Protection Agency...

  4. 32 CFR Appendix C to Part 989 - Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989, App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...

  5. 32 CFR Appendix C to Part 989 - Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989, App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...

  6. 78 FR 76288 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Dam Safety Modification...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-17

    ... Aurora, Colorado (southeast Denver metropolitan area). The remediation actions will be identified through... options may include federal actions which will be the subject of the EIS. 2. Remediation Alternatives. The draft EIS will address an array of remediation alternatives that could reduce the risk of life loss...

  7. 77 FR 47839 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... electronic reporting site-- https://cdx.epa.gov/epa_home.asp EIS No. 20120257, Final EIS, BR, CA, San Joaquin... No. 20120262, Draft EIS, BR, CA, San Luis Reservoir State Recreation Area Resource Management Plan...

  8. 76 FR 57760 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the... alternative) seeks to allocate limited resources among competing human interests, land uses, and conservation...

  9. 78 FR 29131 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ...-202- 3960. EIS No. 20130126, Final EIS, BLM, AZ, Mohave County Wind Farm Project, Review Period Ends..., Contact: Doug Grupenhoff 406-827-0741. EIS No. 20130129, Draft EIS, USA, TX, Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort Bliss, Texas and New Mexico, Comment Period...

  10. 33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Draft EIS C Appendix C to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. C Appendix C to Part 230... copies sent forward must be signed in ink. A xerox copy of the signature is not allowed. c. A six-digit...

  11. 33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Draft EIS C Appendix C to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. C Appendix C to Part 230... copies sent forward must be signed in ink. A xerox copy of the signature is not allowed. c. A six-digit...

  12. 33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Draft EIS C Appendix C to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. C Appendix C to Part 230... copies sent forward must be signed in ink. A xerox copy of the signature is not allowed. c. A six-digit...

  13. 7 CFR 1940.323 - Preparing supplements to EIS's.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Preparing supplements to EIS's. 1940.323 Section 1940... EIS's. (a) Either the State Office or the National Office, as appropriate, will prepare supplements to either draft or final EIS's if: (1) A substantial change or changes occur in the proposed action and such...

  14. 78 FR 54906 - Draft Supplemental Environmental Impact Report/Environmental Impact Statement for a Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...-FF08ECAR00] Draft Supplemental Environmental Impact Report/Environmental Impact Statement for a Proposed... Conservation Commission (CVCC), has prepared a joint draft Supplemental Environmental Impact Report/Environmental Impact Statement (draft Supplemental EIR/EIS) under the National Environmental Policy Act (NEPA...

  15. 75 FR 47826 - Final General Management Plan/Environmental Impact Statement, Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ..., regulations, and policies and the purpose of the Cumberland Gap National Historical Park, the Final GMP/EIS... prescriptions to ensure protection, access and enjoyment of the park's resources. The Final GMP/EIS describes... Final GMP/EIS contains NPS responses to public comments on the Draft GMP/EIS, and copies of agency...

  16. 23 CFR 771.123 - Draft environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...

  17. 23 CFR 771.123 - Draft environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...

  18. 23 CFR 771.123 - Draft environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...

  19. 78 FR 23926 - Extension of the Public Comment Period for the Draft Uranium Leasing Program Programmatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... DEPARTMENT OF ENERGY Extension of the Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement AGENCY: Department of Energy. ACTION: Extension of the public... the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS...

  20. 32 CFR 989.20 - Final EIS.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... limited to factual corrections and responses to comments, the proponent and EPF may, with the prior..., the EPF must submit the Draft EIS and all of the above documents, with a new cover sheet indicating... more extensive modifications are required, the EPF must prepare a preliminary final EIS incorporating...

  1. 75 FR 19969 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    .... 20100121, Draft EIS, DOI, CA, Stanford University Habitat Conservation Plan, Authorization for Incidental... Corridor, Propose to Construct Roadway Improvements from Farm-to-Market (FM) 2920 to Interstate Highway (IH... Mott, 512- 536-5964. EIS No. 20100124, Final EIS, NPS, CA, Prisoners Harbor Coastal Wetland Restoration...

  2. 78 FR 33090 - Re-Opening of the Public Comment Period for the Draft Uranium Leasing Program Programmatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... DEPARTMENT OF ENERGY Re-Opening of the Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement AGENCY: Department of Energy. ACTION: Re-opening of the public... the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS...

  3. 77 FR 23713 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ...-7104. EIS No. 20120109, Draft EIS, FHWA, OR, Salem River Crossing Project, Proposes to Build a Modified.... 20120110, Final EIS, USFWS, CA, Sears Point Wetland and Watershed Restoration Project, To Restore Tidal Wetlands and Rehabilitate Diked Wetlands, Sonoma County, CA, Review Period Ends: 05/ 21/2012, Contact: Don...

  4. 77 FR 42727 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ...: https://cdx.epa.gov . EIS No. 20120230, Draft EIS, USACE, CA, Sierra Vista Specific Plan Development... No. 20120232, Final EIS, RUS, MN, Hampton--Rochester--La Crosse Transmission System Improvement... Hampton, MN and La Crosse, WI, Review Period Ends: 08/20/2012, Contact: Stephanie A. Strength 202-720-0820...

  5. 77 FR 25165 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    .... EIS No. 20120117, Draft EIS, BLM, WY, Lost Creek In Situ Recovery Project, To Analyze the Site... agencies to participate in its e-NEPA electronic EIS submission pilot. Participating agencies can fulfill... filing documents online and providing feedback on the process. To participate in the pilot, register at...

  6. 77 FR 59611 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ...: Sandy Hurlocker 505-753-7331. EIS No. 20120308, Draft EIS (Tiering), NASA, AK, Sounding Rocket Program (SRP) at Poker Flat Research Range (PFRR), Continuing Sounding Rocket Launches, Alaska, Comment Period...

  7. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...

  8. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...

  9. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...

  10. 24 CFR 58.60 - Preparation and filing of environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...

  11. 75 FR 22778 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ...-4711. EIS No. 20100147, Draft EIS, NPS, FL, PROGRAMMATIC--Coral Reef Restoration Plan, Implementation..., Proposes to Salvage Dead and Dying Trees, Treat Excess Fuels, and Plant Trees, Kern River Ranger District...

  12. 78 FR 57849 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... State Solar South Project Proposed Resource Management Plan Amendment, Review Period Ends: 10/21/2013, Contact: Nancy Christ 702-515-5136. Amended Notices EIS No. 20130227, Draft EIS, NASA, CA, Proposed...

  13. 77 FR 26547 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ..., Contact: Bill Dragt 541-573-4473. EIS No. 20120132, Draft EIS, BLM, CA, Haiwee Geothermal Leasing Area, Evaluation of Potential Impacts of Opening for Lease of Federal Mineral Estate for Geothermal Energy...

  14. DUF6 Draft EIS Public Hearing Transcripts

    Science.gov Websites

    and Uses DUF6 Conversion EIS Documents News FAQs Internet Resources Glossary Home » Conversion Facility EISs | Documents News | FAQs | Internet Resources | Glossary Help | Mailing Services | Contact Us

  15. 76 FR 50490 - Draft Comprehensive Conservation Plan and Draft Environmental Impact Statement, Arctic National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... draft CCP and draft EIS'' in the subject line of the message. Fax: Attn: Sharon Seim, Planning Team Leader, (907) 456-0428. U.S. Mail: Sharon Seim, Planning Team Leader, Arctic National Wildlife Refuge... CONTACT: Sharon Seim, Planning Team Leader, at the address listed above, by phone at (907) 456-0501, or by...

  16. 77 FR 73114 - Draft Written Re-Evaluation for Environmental Impact Statement: T.F. Green Airport, Warwick, RI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    [email protected]gov Include ``Comment to T.F. Green Draft Written Re-Evaluation'' in the subject line Mail... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Draft Written Re-Evaluation for... notice to advise the public that a Draft Written Re-Evaluation for an Environmental Impact Statement (EIS...

  17. 78 FR 56682 - Notice of Public Meetings for the Draft Environmental Impact Statement/Overseas Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... U.S. Postal Service to Naval Facilities Engineering Command Pacific, Attention: MITT EIS/OEIS... project Web site ( www.MITT-EIS.com ). All comments, oral or written, submitted during the public review... Facilities Engineering Command Pacific, Attention: MITT EIS/OEIS Project Manager, 258 Makalapa Drive, Suite...

  18. 24 CFR 58.52 - Adoption of other agencies' EISs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... entity adopts an EIS prepared by another agency, the procedure in 40 CFR 1506.3 shall be followed. An adopted EIS may have to be revised and modified to adapt it to the particular environmental conditions and... other agencies' EISs. The responsible entity may adopt a draft or final EIS prepared by another agency...

  19. 23 CFR 771.127 - Record of decision.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... a ROD no sooner than 30 days after publication of the final EIS notice in the Federal Register or 90 days after publication of a notice for the draft EIS, whichever is later. The ROD will present the... identified as the preferred alternative but was fully evaluated in the final EIS, or proposes to make...

  20. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to...

  1. 78 FR 56695 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... National Forest Oil and Gas Leasing Analysis Project, Review Period Ends: 10/21/2013, Contact: Rob Hamilton 435-896-1022 EIS No. 20130266, Draft EIS, USN, GU, The Mariana Islands Training and Testing, Comment...

  2. 75 FR 65320 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... Eight Allotments, Black Hills National Forest, Pennington and Custer Counties, SD, Wait Period Ends: 11... necessary under Section 1506.3(b) of the CEQ Regulations. EIS No. 20100416, Draft EIS, WAPA, CA, Rice Solar...

  3. 75 FR 70917 - Environmental Impacts Statements; Notice Of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... Augustin 651-290-5378. Amended Notices EIS No. 20100386, Draft EIS, BLM, UT, Uinta Basin Natural Gas Development Project, To Develop Oil and Natural Gas Resources within the Monument Butte-Red Wash and West...

  4. 77 FR 42489 - Notice of Availability of the Draft Feasibility Study; Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Draft Feasibility Study; Environmental Impact Statement for the Chatfield Reservoir Storage Reallocation.... Army Corps of Engineers has prepared a Draft Feasibility Report/Environmental Impact Statement (FR/EIS) for the Chatfield Reservoir Storage Reallocation Study, Littleton, Colorado and by this notice is...

  5. 76 FR 55703 - Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Environmental Impact Statement..., Sacramento County, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability and public.... The preliminary design concepts being considered in the Draft EIS/EIR are one three-story building or...

  6. 76 FR 62089 - General Management Plan/Abbreviated Final Environmental Impact Statement, New River Gorge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge National River, West..., and interpretation of park resources over the next 20 years. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets...

  7. 75 FR 76981 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ..., Contact: Cesar Perez 916-498-5065. EIS No. 20100459, Draft EIS, BPA, 00, Big Eddy-Knight Transmission... using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat...

  8. 77 FR 40036 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Ends: 10/03/2012, Contact: Angel Martinez 505-761-8918. EIS No. 20120213, Draft EIS, FRA, IL, Chicago... and Eastern Gulf of Mexico, Cook Inlet, the Beaufort Sea, and the Chukchi Sea, Review Period Ends: 08...

  9. 78 FR 6833 - Final Environmental Impact Statement/Environmental Impact Report for the San Joaquin River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ...The Bureau of Reclamation and the San Joaquin River Exchange Contractors Water Authority have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for a 25-Year Water Transfer Program, 2014-2038. The proposed new program would provide for the transfer and/or exchange of up to 150,000 acre-feet of substitute water from the San Joaquin River Exchange Contractors Water Authority to several potential users over a 25-year timeframe (water service years 2014-2038). A Notice of Availability of the joint Draft EIS/EIR was published in the Federal Register on Friday, May 4, 2012 (77 FR 26578). The written comment period on the Draft EIS/EIR ended Tuesday, July 3, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and additional information received during the review period.

  10. 77 FR 74470 - Notice of Availability for the Draft Environmental Impact Statement for the Gregory Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Notice of Availability for the Draft Environmental Impact Statement for the Gregory Canyon Landfill Project, San Diego County, CA... Draft Environmental Impact Statement (EIS) for the proposed Gregory Canyon Landfill Project in San Diego...

  11. 78 FR 2378 - Reopening of Public Comment Period for the Draft Environmental Impact Statement/Legislative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... DEPARTMENT OF DEFENSE Department of the Navy Reopening of Public Comment Period for the Draft Environmental Impact Statement/Legislative Environmental Impact Statement for Renewal of Naval Air Weapons... Weapons Station China Lake public land withdrawal. A Notice of Availability for the Draft EIS/LEIS was...

  12. 77 FR 42758 - Notice of Availability of the Prehistoric Trackways National Monument Draft Resource Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended, and the... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the...

  13. 77 FR 73049 - Notice of Availability of the Draft Environmental Impact Statement for the Continental Divide...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... Availability of the Draft Environmental Impact Statement for the Continental Divide-Creston Natural Gas... Continental Divide-Creston Natural Gas Development Project, and by this notice is announcing the opening of... comments on the Continental Divide-Creston Natural Gas Development Project Draft EIS within 45 days...

  14. 75 FR 16450 - Kern River Gas Transmission Company; Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... Transmission Company; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Apex...) has prepared a draft environmental impact statement (EIS) for the Apex Expansion Project proposed by... the proposed project would have some adverse environmental impact; however, these impacts would be...

  15. 76 FR 34097 - Notice of Availability of the Draft Environmental Impact Statement, Including a Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... Impact Statement, Including a Draft Programmatic Agreement, for the Clark, Lincoln, and White Pine...), which is included as an Appendix to the EIS, for the Southern Nevada Water Authority's (SNWA) Clark...--Central Nevada Regional Water Authority, White Pine, Lincoln, and Clark counties (NV); and Juab, Millard...

  16. 77 FR 44222 - Notice of Availability of the Draft Surplus Plutonium Disposition Supplemental Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... announcing the dates, times and locations for public hearings to receive comments on the Draft SPD... additional options for pit disassembly and conversion, which entails processing plutonium metal components to... practicable. DOE will hold public hearings on the Draft SPD Supplemental EIS; the dates, times and locations...

  17. 78 FR 40496 - Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Ruby...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ...; MO 4500051040; TAS: 14X5017] Notice of Availability of the Draft Supplemental Environmental Impact... Availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and...) has prepared a Draft Supplemental Environmental Impact Statement (EIS) for the Ruby Pipeline Project...

  18. 78 FR 38026 - Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... Impact Statement (draft EIS) for the Martin Dam Hydroelectric Project No. 349- 173 (Martin Dam Project...

  19. 76 FR 76932 - Public Hearings for 2017 and Later Model Year Light-Duty Vehicle Greenhouse Gas Emissions and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ...EPA and NHTSA are announcing public hearings to be held for the joint proposed rules ``2017 and Later Model Year Light-Duty Vehicle Greenhouse Gas Emissions and Corporate Average Fuel Economy Standards,'' published in the Federal Register on December 1, 2011. The agencies will also accept comment on NHTSA's Draft Environmental Impact Statement (Draft EIS), available on NHTSA's Web site at http:// www.nhtsa.gov/fuel-economy. Three hearings will be held, on January 17, January 19, and January 24, 2012. The agencies will assume that all oral comments presented at the hearing are addressed to the joint proposed rules only, unless speakers specifically reference NHTSA's Draft EIS in oral or written testimony.

  20. 78 FR 48713 - Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...

  1. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska AGENCY: Bureau of Land.../Draft Environmental Impact Statement (EIS) for the Ring of Fire RMP for the Haines Planning Area and by... Fire RMP-- Haines Planning Area Amendment by any of the following methods: Email: [email protected

  2. 78 FR 25301 - Notice of Intent To Prepare a Draft Supplemental Environmental Impact Statement for the Ruby...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ...; 13-08807; MO 4500049868; TAS: 14X5017] Notice of Intent To Prepare a Draft Supplemental Environmental...: Notice of Intent. SUMMARY: As directed by the United States Court of Appeals for the Ninth Circuit, the Bureau of Land Management (BLM) is preparing a Draft Supplemental Environmental Impact Statement (EIS...

  3. 77 FR 5833 - Notice of Availability of the Draft Programmatic Environmental Impact Statement for Allocation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... of the Draft Programmatic Environmental Impact Statement for Allocation of Oil Shale and Tar Sands... of Oil Shale and Tar Sands Resources on Lands Administered by the BLM in Colorado, Utah, and Wyoming... preferred method of commenting. Mail: Addressed to: Oil Shale and Tar Sands Resources Draft Programmatic EIS...

  4. 77 FR 37672 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... EIS, NOAA, AS, Fagatele Bay National Marine Sanctuary Management Plan, Implementation, Tutuila Island.... 20120195, Draft EIS, NPS, FL, Fort Matanzas National Monument General Management Plan, Implementation, St... filing documents online and providing feedback on the process. To participate in the pilot, register at...

  5. 32 CFR Appendix C to Part 989 - Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... chance to speak, when the hearing has culled a representative view of public opinion, or when the time... 32 National Defense 6 2010-07-01 2010-07-01 false Procedures for Holding Public Hearings on Draft..., App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...

  6. 76 FR 34072 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    .... 20110178, Draft EIS, NRC, FL, Generic--License Renewal of Nuclear Plants Regarding Crystal River Unit 3.... 20110182, Final EIS, WAPA, CA, Rice Solar Energy Project, Proposed 150 megawatt Solar Energy Generating..., Access, Wildlife, Fisheries, Soil and Water, Idaho Panhandle National Forest, St. Joe Ranger District...

  7. 76 FR 44000 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ..., NV, Salt Wells Energy Projects, Proposal for Three Separate Geothermal Energy and Transmission...-328-4200. EIS No. 20110233, Draft EIS, BLM, WY, Chokecherry and Sierra Madre Wind Energy Project, Proposes to Construct and Operate a Wind Energy Project, South of Rawlins, Carbon County, WY, Comment...

  8. 77 FR 41402 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... Listed or Petitioned Species, Several Counties, Texas, Comment Period Ends: 10/10/2012, Contact: Adam Zerrenner 512-490-0057. EIS No. 20120224, Draft EIS, FHWA, IL, Illiana Corridor Project Tier One... Mountain Restoration Project, Kaibab National Forest, Coconino County, AZ, Comment Period Ends: 08/27/2012...

  9. 78 FR 40474 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ..., Draft EIS, USA, TX, Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort... Land Management (BLM) has adopted the Federal Energy Regulatory Commission's FEIS 20100001, filed 01/07.... 20130197, Final EIS, USACE, FL, Everglades Agricultural Area A- 1 Shallow Flow Equalization Basin, Review...

  10. 32 CFR 989.19 - Draft EIS.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... summary to the public with an attached list of locations (such as public libraries) where the entire draft... a proposed action will potentially have disproportionately high and adverse human health or... as when there has been a significant change in circumstances, development of significant new...

  11. 77 FR 27478 - Notice of Availability of the Draft Environmental Impact Statement and Draft Proposed California...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ...In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) has prepared a Draft Proposed California Desert Conservation Area (CDCA) Plan Amendment and a Draft Environmental Impact Statement (EIS) for the Haiwee Geothermal Leasing Area (HGLA), Inyo County, California, and by this notice is announcing the opening of the comment period.

  12. 77 FR 27771 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Forest, Custer, Fall River, Lawrence, Meade, and Pennington Counties, SD and Crook and Weston Counties... Improvements Project, Special Use Permit, White River National Forest, Eagle County, CO, Review Period Ends: 06/11/2012, Contact: Don Dressler 970-827-5157. EIS No. 20120142, Draft EIS, USN, 00, Atlantic Fleet...

  13. 78 FR 13082 - Draft Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... Impact Statement/ Environmental Impact Statement, Upper Truckee River and Marsh Restoration Project, El... Statement (EIR/EIS/EIS) for the Upper Truckee River Restoration and Marsh Restoration Project (Project). The... prepare email comments for the Project. The public hearings will be held at 128 Market Street, Stateline...

  14. 76 FR 40925 - Commercial Wind Lease Issuance and Site Characterization Activities on the Atlantic Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    .... The purpose of this notice is to inform the public of the availability of the draft EA for review and... Impact Statement (EIS) would need to be prepared. The draft EA can be accessed online at: http://www...

  15. 75 FR 17951 - Notice Re-opening the Comment Period for the Draft Resource Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ...The Bureau of Land Management (BLM) announces a re-opening of the comment period on the Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Clear Creek Management Area (CCMA). The original notice was published in the Federal Register on December 4, 2009 [74 FR 0232] and provided for a comment period to end on March 5, 2010. The BLM is re-opening the comment period to end April 19, 2010.

  16. Draft Tier 2 Environmental Impact Statement for International Space Station

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The Draft Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA's participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop a human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.

  17. 77 FR 68114 - Notice of Extension of Comment Period for the Draft Environmental Impact Statement for Military...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ... Facilities Engineering Command Northwest, 1101 Tautog Circle Suite 203, Silverdale, Washington, 98315-1101... Burt, NWSTF Boardman EIS Project Manager, 1101 Tautog Circle Suite 203, Silverdale, Washington, 98315-1101. In addition, comments may be submitted online at http://www.NWSTFBoardmanEIS.com during the...

  18. 75 FR 13275 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Dimmett 208-382- 7400. EIS No. 20100083, Draft EIS, BLM, NV, Amargosa Farm Road Solar Energy Project, Construction and Operation of Two Concentrated Solar Power Plant Facilities, Right-of-Way Application on Public..., Blythe Solar Power Project (09- AFC-6), Application for Right-of Way Grant to Construct and Operate, and...

  19. 75 FR 63447 - Intent To Prepare a Draft Environmental Impact Statement for the Louisiana Coastal Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... quality of the environmental decision making. The public includes affected and interested Federal, state... EIS for the LCA Ecosystem Restoration Study, November 2004. The record of decision for the... Ecosystem Restoration Study, November 2004. The record of decision for the programmatic EIS was signed on...

  20. 14 CFR 1216.312 - Timing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... EPA notice of a NASA draft EIS. (2) Thirty days after publication of an EPA notice of a NASA final EIS. (b) When necessary to comply with other specific statutory requirements, NASA shall consult with and... the proposed action (the major decision point of § 1216.304(b)) shall be made by NASA until the later...

  1. 14 CFR 1216.312 - Timing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... EPA notice of a NASA draft EIS. (2) Thirty days after publication of an EPA notice of a NASA final EIS. (b) When necessary to comply with other specific statutory requirements, NASA shall consult with and... the proposed action (the major decision point of § 1216.304(b)) shall be made by NASA until the later...

  2. 14 CFR 1216.312 - Timing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... EPA notice of a NASA draft EIS. (2) Thirty days after publication of an EPA notice of a NASA final EIS. (b) When necessary to comply with other specific statutory requirements, NASA shall consult with and... the proposed action (the major decision point of § 1216.304(b)) shall be made by NASA until the later...

  3. 75 FR 14594 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... Forest, Mono County, CA and Lyon, Douglas, and Mineral Counties, NV, Wait Period Ends: 04/26/2010.../ 2010, Contact: Douglas Gober, 208-476-4541. EIS No. 20100089, Draft EIS, STB, AK, Port MacKenzie Rail..., Richland, Benton County, WA, Comment Period Ends: 05/03/2010, Contact: Mary Beth Burandi, 888-829- 6347...

  4. 76 FR 18151 - Kootenai National Forest, Lincoln County, MT; Miller West Fisher Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... proposed action, the Draft EIS and the Final EIS, and the Forest Service is not inviting comments at this...: Contact Leslie McDougall, Team Leader, Three Rivers Ranger District, at (406) 295-4693. SUPPLEMENTARY...; implementation of best management practices (BMPs) and road maintenance work will be applied to approximately 38...

  5. 76 FR 21345 - Environmental Impacts Statements;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ...'Driscoll 1-866- 208-3372. EIS No. 20110112, Draft EIS, BLM, NM, HB In-Situ-Solution Mining Project.../08/2011 Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air Act, EPA... summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has included its...

  6. 77 FR 67362 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    .... 20120358, Draft Supplement, BOEM, 00, Gulf of Mexico Outer Continental Shelf (OCS) Oil and Gas Lease Sales...: Aaron O. Allen 805-585-2148. EIS No. 20120360, Final EIS, BLM, 00, PROGRAMMATIC--Allocation of Oil Shale and Tar Sands Resources on Lands Administered, Propose to Amend 10 Land Use Plans in Colorado, Utah...

  7. 76 FR 48879 - Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ...] Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for Incidental... future incidental take applications. The take would affect the federally endangered Alabama beach mouse... GCP and the dEIS. These documents analyze the take of the Alabama beach mouse incidental to...

  8. 78 FR 64909 - Southwestern Region: Invasive Plant Control Project, Carson and Santa Fe National Forests, New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ... Register (65 FR 78464) to prepare an environmental impact statement (EIS) for controlling invasive plants... of completion and distribution for the draft supplemental environmental impact statement (DSEIS) as... the final supplemental environmental impact statement (FSEIS) and draft records of decision (each...

  9. 78 FR 19261 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... No. 20130073, Draft Supplement, NRC, WY Ross In-Situ Leach Recovery (ISR) Project, Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities, Comment Period Ends... project. EIS No. 20130075, Draft Supplement, NMFS, AK, Effects of Oil and Gas Activities in the Arctic...

  10. 76 FR 49526 - Environmental Impact Statement; Saint Louis County, MN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... environmental impacts of alternatives, including (1) No-build, (2) Purchasing title and possession of the.... The Scoping Document/Draft Scoping Decision Document is anticipated to be published in late 2011. A... Decision Document will be published after the public comment period has closed. A Draft EIS will be...

  11. 77 FR 2028 - 2017 and Later Model Year Light-Duty Vehicle Greenhouse Gas Emissions and Corporate Average Fuel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ...EPA and NHTSA are announcing a 14-day extension of the comment period for the joint proposed rules ``2017 and Later Model Year Light- Duty Vehicle Greenhouse Gas Emissions and Corporate Average Fuel Economy Standards,'' published in the Federal Register on December 1, 2011 (76 FR 74854). The comment period was to end on January 30, 2012 (60 days after publication of the proposals in the Federal Register). This document extends the comment period to February 13, 2012. This extension of the comment period is provided to allow the public additional time to comment on the proposed rule. The extension of the comment period does not apply to NHTSA's Draft Environmental Impact Statement (Draft EIS), available on NHTSA's Web site at www.nhtsa.gov/fuel-economy. The comment period for NHTSA's Draft EIS closes on January 31, 2012.

  12. X-33 Environmental Impact Statement: A Fast Track Approach

    NASA Technical Reports Server (NTRS)

    McCaleb, Rebecca C.; Holland, Donna L.

    1998-01-01

    NASA is required by the National Environmental Policy Act (NEPA) to prepare an appropriate level environmental analysis for its major projects. Development of the X-33 Technology Demonstrator and its associated flight test program required an environmental impact statement (EIS) under the NEPA. The EIS process is consists of four parts: the "Notice of Intent" to prepare an EIS and scoping; the draft EIS which is distributed for review and comment; the final ETS; and the "Record of Decision." Completion of this process normally takes from 2 - 3 years, depending on the complexity of the proposed action. Many of the agency's newest fast track, technology demonstration programs require NEPA documentation, but cannot sustain the lengthy time requirement between program concept development to implementation. Marshall Space Flight Center, in cooperation with Kennedy Space Center, accomplished the NEPA process for the X-33 Program in 13 months from Notice of Intent to Record of Decision. In addition, the environmental team implemented an extensive public involvement process, conducting a total of 23 public meetings for scoping and draft EIS comment along with numerous informal meetings with public officials, civic organizations, and Native American Indians. This paper will discuss the fast track approach used to successfully accomplish the NEPA process for X-33 on time.

  13. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  14. 77 FR 43275 - Extension of Public Comment Period for the Draft Environmental Impact Statement for Naval Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Facilities Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30... Facilities Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30, Building 903, NAS Jacksonville, FL 32212 or electronically via the project Web site ( http://www.keywesteis...

  15. 75 FR 10305 - Environmental Impact Statement and Habitat Conservation Plan for the Incidental Take of Seven...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Statement (EIS) to evaluate the impacts of, and alternatives to, the proposed issuance of an Endangered... alternatives and issues to be addressed in the draft EIS must be received by close of business on June 3, 2010... gather the information necessary to determine impacts and alternatives to support a decision regarding...

  16. 76 FR 68741 - Notice of Intent To Prepare a Draft Environmental Impact Statement/Environment Impact Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... studies that are underway. 5. Scoping Process: The Corps and County Parks will jointly conduct a series of... development of the EIS/EIR and associated technical studies are being completed to determine the Agency... Association of Governments (SANDAG). The EIR/EIS is currently evaluating three alternative restoration designs...

  17. 76 FR 56220 - Draft Environmental Impact Statement for General Management Plan for Golden Gate National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... Environmental Impact Statement for General Management Plan for Golden Gate National Recreation Area and Muir... Management Plan for Golden Gate National Recreation Area and Muir Woods National Monument. SUMMARY: In accord... Environmental Impact Statement (Draft EIS) for the updating the General Management Plan (GMP) for Golden Gate...

  18. 75 FR 51478 - Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Cortez...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... amended, the Bureau of Land Management (BLM), Battle Mountain District, Mount Lewis Field Office, Battle Mountain, Nevada, has prepared a Draft Supplemental Environmental Impact Statement (EIS) for the Cortez... meetings in Crescent Valley and Battle Mountain, Nevada. The BLM will announce future meetings or hearings...

  19. 78 FR 28205 - Notice of Availability of the Draft Environmental Impact Statement for the Lake Charles Carbon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... Lake Charles Carbon Capture and Sequestration Project (DOE/EIS-0464D) AGENCY: U.S. Department of Energy...) announces the availability of the Lake Charles Carbon Capture and Sequestration Project Draft [[Page 28206... potential environmental impacts associated with the Lake Charles Carbon Capture and Sequestration Project...

  20. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... submitted pursuant to § 921.12, the state may begin draft management plan development and the collection of information necessary for the preparation by NOAA of an EIS. The state shall develop a draft management plan... areas of the Reserve, ranking these areas according to their relative importance, and including a...

  1. 77 FR 11154 - Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... BLM will announce future meetings or hearings and any other public participation activities at least..., Attention--Eastern Interior Draft RMP/EIS, Bureau of Land Management, 1150 University Avenue, Fairbanks... interior Alaska and is divided into four geographic areas: The Fortymile, Steese, Upper Black River, and...

  2. 75 FR 51477 - Notice of Availability of the Draft Environmental Impact Statement for the Alamogordo Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... Regional Water Supply Project, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... Alamogordo Regional Water Supply Project and by this notice is announcing the opening of the comment period... Alamogordo Regional Water Supply Project Draft EIS within 60 days following the date the Environmental...

  3. 75 FR 1048 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... ending March 19, 2010. The State of Washington, Department of Ecology (Ecology) is a cooperating agency.... For general questions and information about the Washington State Department of Ecology, contact... Ecology as a cooperating agency, prepared the Draft TC & WM EIS in accordance with the Council on...

  4. 76 FR 40390 - Notice of Availability of a Draft Land Use Plan Amendment, Environmental Impact Statement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ..., 474 megawatt (MW) wind energy project including 158 wind turbine generators, a substation... Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Project...

  5. 77 FR 70182 - Impact Report for the Proposed Stateline Solar Farm, San Bernardino County, CA and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... application for a ROW grant to construct, operate, maintain, and decommission a photovoltaic solar energy... Proposed Stateline Solar Farm, San Bernardino County, CA and Draft California Desert Conservation Area Land... Statement/Environmental Impact Report (EIS/EIR) for the Stateline Solar Farm Project (Stateline) and by this...

  6. 75 FR 74742 - Notice of Extension of Public Comment Period to Notice of Availability of the Draft Jarbidge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Resource Management Plan and Environmental Impact Statement, Idaho AGENCY: Bureau of Land Management... Availability of the Draft Jarbidge Field Office Resource Management Plan (RMP) and Environmental Impact Statement (EIS) in the Federal Register on September 3, 2010 [75 FR 54177] and [[Page 74743

  7. 78 FR 13376 - Draft Environmental Impact Statement for the Cottonwood Cove and Katherine Landing Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... Environmental Impact Statement for the Cottonwood Cove and Katherine Landing Development Concept Plans, Clark...) for the Cottonwood Cove and Katherine Landing Development Concept Plans, Lake Mead National Recreation... environment. DATES: The National Park Service will accept comments on the Draft EIS from the public for 60...

  8. 76 FR 17406 - Postponement of Public Hearing on the Draft Environmental Impact Statement for the Mountaineer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... DEPARTMENT OF ENERGY Postponement of Public Hearing on the Draft Environmental Impact Statement for the Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, WV AGENCY: U.S... Carbon Capture and Storage Project (DOE/EIS-0445D) for public review and comment in a Federal Register...

  9. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  10. 75 FR 22758 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Dam Safety Assurance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... instrumentation to ensure adequate monitoring and to provide suitable baseline information. 2. Remediation Alternatives. The draft EIS will address an array of remediation alternatives that are necessary to prevent... benefits. The exact nature and extent of the remediation alternatives will be determined based on the...

  11. 75 FR 6004 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Dam Safety Assurance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... evaluation of the main dam's overall earthquake performance. 2. Remediation Alternatives. The draft EIS will address an array of remediation alternatives that are necessary to prevent loss of life, extensive... extent of the remediation alternatives will be determined based on the results of on- going geotechnical...

  12. 75 FR 67095 - Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, Montana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ...] Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, Montana AGENCY: Fish and... conservation plan (CCP) and environmental impact statement (EIS) for Charles M. Russell and UL Bend National... are extending the comment period for review of the draft CCP and EIS for Charles M. Russell NWR and UL...

  13. 78 FR 756 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Vantage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... Vantage-Pomona Heights 230kV Transmission Line Project in Yakima, Grant, Benton, and Kittitas Counties, WA...) has prepared a Draft Environmental Impact Statement (EIS) for the Vantage- Pomona Heights 230kV... submit comments related to the Vantage-Pomona Heights 230kV Transmission Line Project by any of the...

  14. 77 FR 55195 - Notice of Public Meetings for the Draft Environmental Impact Statement for Naval Weapons Systems...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... the analysis in the Draft EIS. Each of the public meetings will include an open house information... review at the following public libraries: 1. Multnomah County Central Library, 801 Southwest 10th Avenue, Portland, Oregon 97205. 2. Boardman Branch of the Oregon Trail Library District, 200 South Main Street...

  15. 76 FR 38676 - Gulf of Mexico (GOM), Outer Continental Shelf (OCS), Central Planning Area (CPA), Oil and Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... September 2008. SUPPLEMENTARY INFORMATION: BOEMRE developed the Draft SEIS for CPA Lease Sale 216/222 to consider new information made available since completion of the Multisale EIS and 2009-2012 SEIS, including information concerning the Deepwater Horizon event and spill and new regulatory requirements. This Draft SEIS...

  16. 78 FR 4164 - Draft Environmental Impact Statement for the Proposed Point Molate Resort and Casino for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the Proposed Point Molate Resort and Casino for the Guidiville Band of the Pomo Indians, Contra Costa County... Impact Statement (EIS) for the BIA Federal action of approving the fee-to- trust transfer and casino...

  17. 75 FR 6057 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chevron...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... right-of-way (ROW) authorization to construct and operate a 45-megawatt solar photovoltaic project and... Energy Solutions Lucerne Valley Solar Project, San Bernardino County, CA, and the Draft California Desert... Statement (EIS) for the proposed Chevron Energy Solutions Lucerne Valley Solar Project and by this notice is...

  18. 75 FR 67391 - Notice of Intent To Prepare a Draft Environmental Impact Statement for the West Coast Recycling...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... a Draft Environmental Impact Statement for the West Coast Recycling Group Project in West Sacramento... (EIS/EIR) for the development of the West Coast Recycling Group project located at the Port of West... meeting date. SUPPLEMENTARY INFORMATION: Description of the Proposed Action The West Coast Recycling Group...

  19. 75 FR 12736 - Notice of Reopening of Comment Period for the Draft Environmental Impact Statement for the Silver...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ... Environmental Impact Statement for the Silver Strand Training Complex AGENCY: Department of the Navy, DoD. ACTION: Notice. SUMMARY: A notice of availability was published by the U.S. Environmental Protection... (SSTC) Draft Environmental Impact Statement (EIS). The public review period ended on March 8, 2010. This...

  20. 78 FR 52602 - Notice To Rescind a Notice of Intent and Draft Environmental Impact Statement: I-17 Corridor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... and Draft Environmental Impact Statement: I-17 Corridor Improvement Study; Maricopa County, Arizona... Corridor Improvement Study was published in the Federal Register on January 6, 2010. FOR FURTHER... Corridor is located in the city of Phoenix, and the study area limits for the EIS consisted of...

  1. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...

  2. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...

  3. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...

  4. 33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Appendix A to Part 230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA Pt. 230, App. A Appendix A to Part 230—Processing... integrating the draft EIS or EA and draft FONSI (as appropriate), or a separate NEPA document and circulate it...

  5. 78 FR 26065 - Notice of Availability of the Draft Environmental Impact Statement for the Jump Creek, Succor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Cow Creek Watersheds Grazing Permit Renewal, ID AGENCY: Bureau of Land Management, Interior. ACTION... the Jump Creek, Succor Creek, and Cow Creek Watersheds Grazing Permit Renewal and by this notice is... receive written comments on the Draft EIS for the Jump Creek, Succor Creek, and Cow Creek Watersheds...

  6. 77 FR 25193 - Notice of Availability of the Draft Environmental Impact Statement for the Lost Creek Uranium In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... (EIS) for the Lost Creek Uranium In Situ Recovery (ISR) Project and by this notice is announcing the...-166318] Notice of Availability of the Draft Environmental Impact Statement for the Lost Creek Uranium In Situ Recovery Project, Wyoming AGENCY: Bureau of Land Management, Interior. [[Page 25194

  7. 76 FR 13396 - Notice of Availability of the Draft Environmental Impact Statement for the Mountaineer Commercial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... deep saline geologic formations for permanent geologic storage. DATES: DOE invites the public to...; or by fax (304) 285-4403. The Draft EIS is available on DOE's NEPA Web page at: http://nepa.energy.gov/DOE_NEPA_documents.htm ; and on the National Energy Technology Laboratory's Web page at: http...

  8. 77 FR 68814 - Notice of Availability of the Draft Environmental Impact Statement for the Gas Hills In Situ...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000.L51100000.GN0000.LVEMK10CW370-WYW... Recovery Uranium Project, Fremont and Natrona Counties, WY AGENCY: Bureau of Land Management, Interior... (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement (EIS...

  9. 76 FR 54452 - Intent to Prepare a Draft Environmental Impact Statement for the Proposed Cordova Hills Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent to Prepare a Draft Environmental Impact Statement for the Proposed Cordova Hills Project in Sacramento County, CA, Corps Permit.... Potentially significant issues to be analyzed in depth in the EIS include loss of waters of the United States...

  10. 77 FR 1080 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Copper Flat Mine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-09

    ...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Copper Flat Mine Plan of... the Draft EIS. ADDRESSES: You may submit comments related to the Copper Flat EIS Project by any of the... New Mexico Copper Corp. to re-start the Copper Flat Mine located in Sierra County, New Mexico. The...

  11. NEPA Manual for Materiel Acquisition

    DTIC Science & Technology

    2000-11-01

    of it in the final EIS. For example, a commentor on a draft EIS on a proposal for a pumped storage power facility might suggest that the applicant’s...strips around streams and replacing inorganic fertilizers with animal manures, and reducing soil erosion through modified tillage and irrigation...available items and products for military application (for example, sportsman’s products and wear such as holsters , shotguns, sidearms, protective shields

  12. 36 CFR 801.6 - Coordination with requirements under the National Environmental Policy Act (42 U.S.C. 4321 et seq.).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...

  13. 36 CFR 801.6 - Coordination with requirements under the National Environmental Policy Act (42 U.S.C. 4321 et seq.).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...

  14. 36 CFR 801.6 - Coordination with requirements under the National Environmental Policy Act (42 U.S.C. 4321 et seq.).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...

  15. 36 CFR 801.6 - Coordination with requirements under the National Environmental Policy Act (42 U.S.C. 4321 et seq.).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...

  16. 36 CFR § 801.6 - Coordination with requirements under the National Environmental Policy Act (42 U.S.C. 4321 et seq.).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...

  17. 78 FR 40497 - Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA); the Federal Land Policy and Management Act of 1976, as amended; and the California Environmental Quality Act of 1970 (CEQA), the Bureau of Land Management (BLM), the United States Forest Service (USFS), and the Great Basin Unified Air Pollution Control District (GBUAPCD), a California State agency, have prepared a Final Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development Project near the town of Mammoth Lakes in Mono County, California, and by this notice are announcing its availability.

  18. 75 FR 81249 - Intent To Prepare a Supplemental Draft Environmental Impact Statement for a Proposed Flood Risk...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... Draft Environmental Impact Statement for a Proposed Flood Risk Management Project on the Red River of... Study (EIS/FS) for a Proposed Fargo- Moorhead Flood Risk Management Project on the Red River of the North in Fargo, ND, and Moorhead, MN (Proposed Fargo-Moorhead Project). On May 5, 2009, the St. Paul...

  19. 77 FR 60139 - Draft Environmental Impact Statement for the Proposed Pueblo of Jemez 70.277-Acre Fee-to-Trust...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the... all work on an Environmental Impact Statement (EIS) for the BIA Federal action of approving a 70.277 acre fee-to-trust transfer and casino project located within Do[ntilde]a Ana County, New Mexico. DATES...

  20. 77 FR 2999 - Notice of Availability of the Draft Environmental Impact Statement and Notice of Segregation for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... Resource Management Plan. The proposed wind turbines would be up to 262-feet-tall from the ground to the... to 415 feet. In addition to the wind turbines, the proposed project would require the construction of... the Draft EIS--an 87 wind turbine layout, a 96 wind turbine alternative, and a no-action alternative...

  1. 77 FR 31386 - Notice of Availability of a Draft Environmental Impact Statement for the Proposed McCoy Solar...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... decommission an up to 750 megawatt (MW) photovoltaic solar energy generation facility and necessary ancillary... LVRWB10B3980] Notice of Availability of a Draft Environmental Impact Statement for the Proposed McCoy Solar... Impact Statement (EIS) for McCoy Solar, LLC's right-of-way (ROW) application for the McCoy Solar Energy...

  2. 77 FR 74729 - Notice To Rescind a Notice of Intent and Draft Environmental Impact Statement: I-10 Corridor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ... and Draft Environmental Impact Statement: I-10 Corridor Improvement Study; Maricopa County, AZ AGENCY..., Arizona. A NOI to prepare an EIS for the I-10 Corridor Improvement Study was published in the Federal..., Arizona. The I-10 Corridor is in or adjacent to the cities of Phoenix, Tempe, and Chandler, as well as the...

  3. 76 FR 30956 - Outer Continental Shelf, Alaska OCS Region, Chukchi Sea Planning Area, Oil and Gas Lease Sale 193

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... Continental Shelf, Alaska OCS Region, Chukchi Sea Planning Area, Oil and Gas Lease Sale 193 AGENCY: Bureau of...: BOEMRE announces the availability of a Revised Draft SEIS, OCS Oil and Gas Lease Sale 193, Chukchi Sea.... The Revised Draft SEIS augments the analysis of the Final EIS, Oil and Gas Lease Sale 193, Chukchi Sea...

  4. 75 FR 80807 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ..., CA, East County Substation/Tule Wind/ Energia Sierra Juarez Gen-Tie Projects, Construction and.... 20100462, Draft EIS, FWS, CA, Santa Clara Valley Habitat Plan, To Protect and Enhance Ecological Diversity...

  5. 76 FR 72702 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... PV Solar Generating Station and Associated Infrastructure, Clark County, NV, Comment Period Ends: 01.... 20110400, Draft EIS, BIA, NV, K Road Moapa Solar Generation Facility, Moapa Band of Paiutes (Tribe), to...

  6. 76 FR 18217 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    .... 20110089, Draft EIS, HUD, CA, West Coast Recycling Group Metal Recycling Facility Project, Proposal to Develop and Operate a Scrap Metal Shredding and Recycling Facility at the Port of West Sacramento, Yolo...

  7. Report: Evaluation of Superfund Environmental Indicators

    EPA Pesticide Factsheets

    Report #2002-P-3, December 27, 2001. Overall, the draft Superfund EIs were suitable because they measure a state of the environment, instead of marking the completion of an administrative step in the Superfund cleanup process.

  8. 33 CFR 230.19 - Comments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CFR 1503 and 1506.6. A lack of response may be presumed to indicate that the party has no comment to... will provide comments on another Federal agency's draft EIS even if the response is no comment...

  9. 76 FR 63922 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... City Charlotte to I-485 near the Mecklenburg-Cabarrus County Line, Charlotte-Mecklenburg County, NC, Review Period Ends: 11/ 14/2011, Contact: Brian C. Smart 404-865-5607. EIS No. 20110342, Draft Supplement...

  10. 76 FR 63910 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Excelsior Estates...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... (Branchinecta lynchi), vernal pool tadpole shrimp (Lepidurus packardi), Sacramento Orcutt grass (Orcuttia viscida) and slender Orcutt grass (Orcuttia tenuis). The EIS will include alternatives to the Proposed...

  11. 78 FR 13873 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ..., CA, Middle Fork American River Project, Review Period Ends: 04/01/2013, Contact: Matt Buhyoff 202-502.... 20130048, Draft EIS, BOEM, 00, Gulf of Mexico OCS Oil and Gas Lease Sales: 2014 and 2016 Eastern Planning...

  12. Supplement analysis for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore. Volume 2: Comment response document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The US Department of Energy (DOE), prepared a draft Supplement Analysis (SA) for Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL-L), in accordance with DOE`s requirements for implementation of the National Environmental Policy Act of 1969 (NEPA) (10 Code of Federal Regulations [CFR] Part 1021.314). It considers whether the Final Environmental Impact Statement and Environmental Impact Report for Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore (1992 EIS/EIR) should be supplement3ed, whether a new environmental impact statement (EIS) should be prepared, or no further NEPA documentation is required. The SAmore » examines the current project and program plans and proposals for LLNL and SNL-L, operations to identify new or modified projects or operations or new information for the period from 1998 to 2002 that was not considered in the 1992 EIS/EIR. When such changes, modifications, and information are identified, they are examined to determine whether they could be considered substantial or significant in reference to the 1992 proposed action and the 1993 Record of Decision (ROD). DOE released the draft SA to the public to obtain stakeholder comments and to consider those comments in the preparation of the final SA. DOE distributed copies of the draft SA to those who were known to have an interest in LLNL or SNL-L activities in addition to those who requested a copy. In response to comments received, DOE prepared this Comment Response Document.« less

  13. 77 FR 63437 - Notice of Extension of Public Comment Period for Environmental Impact Statement for the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... correspondence. FOR FURTHER INFORMATION CONTACT: Chief Engineer, Engineering Service (138), San Francisco...-4810, extension 2009. The SFVAMC LRDP and Draft EIS are available for viewing on the SFVAMC Web site...

  14. 78 FR 23548 - Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Control Specialists, LLC, site near Andrews, Texas. Since publication of the 2011 Mercury Storage EIS, DOE... identified the Waste Control Specialists, LLC location near Andrews, Texas, as the Preferred Alternative in...

  15. 75 FR 69983 - Notice of Intent to Prepare a Draft Environmental Impact Statement (EIS), Initiate the Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... that water quality has improved, these canals allow the transfer of both indigenous and nonindigenous... Water and Related Land Resource Implementation Studies, Water Resources Council, March 10, 1983. 2...

  16. 77 FR 34337 - Uinta-Wasatch-Cache National Forest; Evanston-Mountain View Ranger District; Utah; Smiths Fork...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... individuals and organizations who have submitted specific written comments related to the proposed action... the draft EIS will be eligible to file an objection under the Healthy Forests Restoration Act. The...

  17. 78 FR 45277 - Notice of Intent to Prepare a Draft Environmental Impact Statement (EIS) for Development of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... that are safe, humane, cost-efficient, and appropriately secure, and that provide work and other self-improvement opportunities to assist offenders in becoming law-abiding citizens. The Bureau accomplishes its...

  18. 16 CFR 1021.8 - Legislative proposals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ENVIRONMENTAL REVIEW Procedures § 1021.8... hearings and deliberations. The draft EIS shall be forwarded to the Environmental Protection Agency in accordance with § 1506.9 of the NEPA regulations. Comments on the legislative statement and CPSC's responses...

  19. 32 CFR 989.19 - Draft EIS.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... as when there has been a significant change in circumstances, development of significant new... proposed action. Significant new information leading to public controversy regarding the scope after the scoping process is such a changed circumstance. An additional public comment period may also be necessary...

  20. 76 FR 50213 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Bakersfield Section High-Speed Train, Proposes to Construct, Operate, and Maintain an Electric-Powered High...): Merced to Fresno Section High-Speed Train, Proposes to Construct, Operate, and Maintain an Electric.... 20110190, Draft EIS, FRA, MS, Tupelo Railroad Relocation Planning and Environmental Study, To Improve...

  1. 75 FR 7438 - Notice of Availability of the Draft Supplemental Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... 2012 (see 16 U.S.C. 3831(d)). Alfalfa and multiyear grasses and legumes in a rotation practice with an... pollinators (see 16 U.S.C. 3844(h)). Under the National Environmental Policy Act (NEPA), the EIS process...

  2. 75 FR 38833 - Walker River Basin Acquisition Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... Acquisition Program recipient and has therefore determined National Environmental Policy Act (NEPA) compliance... that NEPA compliance is not required in the July 2009 Draft EIS and shared the decision at the August... address the lake's environmental conditions. Reclamation's role related to the Acquisition Program as...

  3. EIS No. 20100312 EIS Comanche Peak Nuclear Power Plant Units 3 and 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bjornstad, David J

    2010-08-01

    In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31,more » 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100312, Draft EIS, NRC, TX, Comanche Peak Nuclear Power Plant Units 3 and 4, Application for Combined Licenses (COLs) for Construction Permits and Operating Licenses, (NUREG-1943), Hood and Somervell Counties, TX, Comment Period Ends: 10/26/2010.« less

  4. A study of the review and comment phase of the environmental impact statement : draft and negative.

    DOT National Transportation Integrated Search

    1972-01-01

    This study examined the agencies that review the environmental impact statements (EIS) prepared on highway projects and was an attempt to shed light on the functions, personnel, and problems of the offices that saw the statements. The report covered ...

  5. A study of the review and comment phase of the draft environmental impact statement.

    DOT National Transportation Integrated Search

    1974-01-01

    Since the enactment of the National Environmental Policy Act in 1969, there has been considerable change in the efficiency of the preparation and distribution of environment a impact statements (EIS). This study was an evaluation of the review and co...

  6. 15 CFR 971.212 - Public notice, hearing and comment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested... public hearing on the application and the draft EIS in an appropriate location and may employ additional...

  7. 15 CFR 971.212 - Public notice, hearing and comment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested... public hearing on the application and the draft EIS in an appropriate location and may employ additional...

  8. 15 CFR 971.212 - Public notice, hearing and comment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested... public hearing on the application and the draft EIS in an appropriate location and may employ additional...

  9. 15 CFR 971.212 - Public notice, hearing and comment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS... commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested... public hearing on the application and the draft EIS in an appropriate location and may employ additional...

  10. 76 FR 5156 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Firm Water Supplies, Improve Water Quality, and to Reduce Water Costs, San Bernardino and Riverside.... 20110020, Draft EIS, NRCS, IA, Clarke County Water Supply, To Construct a Multiple-purpose Structure that Provides for Rural Water Supply and Water Based Recreational Opportunities, Clarke County, IA, Comment...

  11. 75 FR 81972 - New England Fishery Management Council; Public Meeting; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... Committee will continue development of catch monitoring alternatives for inclusion in Amendment 5 to the... management alternatives for inclusion in Amendment 5 Draft EIS (catch monitoring program, measures to address... physically accessible to people with disabilities. Requests for sign language interpretation or other...

  12. 40 CFR 149.105 - Decision to review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator shall review under section 1424(e) all projects located in the recharge or streamflow source zone of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... 149.105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  13. 40 CFR 149.105 - Decision to review.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Administrator shall review under section 1424(e) all projects located in the recharge or streamflow source zone of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... 149.105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  14. 15 CFR 921.12 - Post site selection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...

  15. 15 CFR 921.12 - Post site selection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...

  16. 15 CFR 921.12 - Post site selection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...

  17. 15 CFR 921.12 - Post site selection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...

  18. 76 FR 75557 - Draft Environmental Impact Statement for General Management Plan/Wilderness Study, Hawaii...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park... Service is expanding the scope of the Environmental Impact Statement (EIS) that is being prepared for updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...

  19. 78 FR 20632 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Management Project, Rio Grande National Forest, Review Period Ends: 05/17/2013, Contact: Diana McGinn 719-852... Creek Management Area Proposed Resource Management Plan, Review Period Ends: 05/06/2013, Contact: Sky.... EIS No. 20130082, Draft Supplement, FERC, ME, Downeast Liquefied Natural Gas (LNG) Project, Comment...

  20. 76 FR 29215 - Notice of Intent To Prepare Draft Environmental Impact Statements/Environmental Impact Reports...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... because they partially overlap in their study areas, purpose, potential improvements, potential effects... that an EIS/EIR will be prepared to describe alternatives, potential environmental effects, and... funding toward flood management improvements. These funds may be matched with those from the Early...

  1. 77 FR 68813 - Notice of Availability of the Draft Environmental Impact Statement and Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... geothermal unit, which is currently providing energy sufficient to power three operating geothermal plants... the Casa Diablo IV Geothermal Development Project, CA AGENCY: Bureau of Land Management, Interior... Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development...

  2. 43 CFR 10010.45 - Time periods.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Time periods. 10010.45 Section 10010.45... Environmental Impact Statements § 10010.45 Time periods. (a) The minimum review period for a draft EIS will be... proposed reductions in time periods or any extensions of time periods proposed by those agencies. ...

  3. 43 CFR 10010.45 - Time periods.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Time periods. 10010.45 Section 10010.45... Environmental Impact Statements § 10010.45 Time periods. (a) The minimum review period for a draft EIS will be... proposed reductions in time periods or any extensions of time periods proposed by those agencies. ...

  4. 43 CFR 10010.45 - Time periods.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Time periods. 10010.45 Section 10010.45... Environmental Impact Statements § 10010.45 Time periods. (a) The minimum review period for a draft EIS will be... proposed reductions in time periods or any extensions of time periods proposed by those agencies. ...

  5. 75 FR 60804 - Nimbus Hatchery Fish Passage Project, Lower American River, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Nimbus Hatchery Fish Passage Project, Lower... Act (CEQA), the Bureau of Reclamation, the lead Federal agency, and the California Department of Fish... Draft EIS/EIR for the Nimbus Hatchery Fish Passage Project (Project). The purpose of the Project is to...

  6. 15 CFR 921.12 - Post site selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NOAA approval of a proposed site, the state may submit a request for funds to develop the draft... and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information...

  7. 75 FR 58348 - Revision of the Shoshone National Forest Land and Resource Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... process: 1. Comprehensive Evaluation Report (CER) (April 2009)--Much of the background material in this report will be carried forward in the Analysis of the Management Situation or draft EIS. The CER..., and ecological conditions and trends that contribute to sustainability. The CER identifies factors...

  8. 78 FR 65643 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ..., Gas Hills In-Situ Recovery Uranium Project, Review Period Ends: 12/02/2013, Contact: Tom Sunderland..., Tiering FEIS--U.S. Coast Guard Rulemaking for Dry Cargo Residue Discharges in the Great Lakes, Review... No. 20130290, Draft EIS, NPS, CA, Restoration of Native Species in High Elevation Aquatic Ecosystems...

  9. 78 FR 68469 - Draft General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ...: The park includes five remote islands spanning 2,228 square miles of land and sea. Updating the park's... General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands National Park... (GMP)/Wilderness Study/Environmental Impact Statement (EIS) for Channel Islands National Park. The...

  10. 76 FR 59158 - Notice of Availability of Draft General Management Plan/Environmental Impact Statement for Effigy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... Management Plan/ Environmental Impact Statement for Effigy Mounds National Monument, Iowa AGENCY: National... Protection Agency. Public meetings will be held during the 60-day review period on the GMP/EIS in the Harpers... experience, to the socioeconomic environment, and to monument operations and facilities. The preferred...

  11. 76 FR 24868 - Extension of Public Comment Period for the Draft Environmental Impact Statement for the Trident...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ... INFORMATION CONTACT: Ms. Christine Stevenson, EHW-2 EIS Project Manager, 1101 Tautog Circle, Silverdale, Washington 98315-1101; or http://ehw.nbkeis.com/ . SUPPLEMENTARY INFORMATION: This notice announces a fifteen... Manager, 1101 Tautog Circle, Silverdale, Washington 98315-1101. In addition, comments may be submitted...

  12. 76 FR 63909 - Draft Programmatic Environmental Impact Statement (EIS) for Modernization of Training...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... the training requirements of military units in Hawai`i. This modernization would improve the quality... at PTA are old, are operating beyond their useful life and do not meet current DoD design standards... with the possible effects to air quality, historic resources, and threatened and endangered species...

  13. 78 FR 43868 - Notice of Intent To Prepare a Draft Environmental Impact Statement for the Whittier Narrows Dam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... completed in 1957 as an integral component of the Los Angeles County Drainage Area system of dams and... several measures including: emergency management preparedness, remote monitoring, increased inspections... Scope of Analysis. The EIS will also evaluate the impacts of alternatives on environmental resources...

  14. 40 CFR 149.105 - Decision to review.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Sole Source Aquifer in the San Antonio, Texas Area § 149.105 Decision to review. (a) The Regional... of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... of a public petition, the Regional Administrator shall decide whether the project which is the...

  15. 40 CFR 149.105 - Decision to review.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Sole Source Aquifer in the San Antonio, Texas Area § 149.105 Decision to review. (a) The Regional... of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... of a public petition, the Regional Administrator shall decide whether the project which is the...

  16. 40 CFR 149.105 - Decision to review.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Sole Source Aquifer in the San Antonio, Texas Area § 149.105 Decision to review. (a) The Regional... of the aquifer for which a draft or final EIS is submitted which may have an impact on ground water... of a public petition, the Regional Administrator shall decide whether the project which is the...

  17. 76 FR 39436 - Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) and Notice of Scoping...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... other CVP contractors, to Reclamation's Refuge Water Supply Program (RWSP) for delivery to the San... livestock and/or municipal and industrial uses because of water supply shortages or when full contract... Contractors Water Authority's 25-Year Water Transfer Program 2014 to 2038, California AGENCY: Bureau of...

  18. 75 FR 65503 - Odessa Subarea Special Study; Adams, Franklin, Grant, and Lincoln Counties, Washington INT-DES 10-54

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... Draft EIS for the Odessa Subarea Special Study. The Washington Department of Ecology (Ecology) is a... associated economic and other effects, Congress has funded Reclamation to investigate this problem. Ecology... (HB 2860) that directs Ecology to aggressively pursue development of water benefiting both instream...

  19. 76 FR 18780 - Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project, Benton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Enhancement Project. The Washington State Department of Ecology (Ecology) will be a joint lead agency with..., most of these water right uncertainties have been addressed. In 2003, Reclamation and Ecology initiated... with comments on the Draft PR/EIS prompted Ecology to separate from the National Environmental Policy...

  20. 75 FR 77654 - Notice of Intent To Prepare a Land Use Plan Amendment and an Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ..., maintenance, and decommissioning of wind turbine generators and associated facilities necessary to... the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County, CA AGENCY: Bureau of... Pattern Energy Group Ocotillo Express Wind Energy Project Draft EIR/EIS by any of the following methods...

  1. 77 FR 59180 - Withdrawal of Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... of Ballona Creek including coastal wetlands. Santa Monica Bay Restoration Commission (SMBRC) is the... Restoration Feasibility Study, Los Angeles County, CA AGENCY: Department of the Army, U.S. Army Corps of.../Environmental Impact Report (EIS/EIR) for the Ballona Creek Ecosystem Restoration Feasibility Study in the...

  2. 78 FR 64242 - Outer Continental Shelf (OCS), Gulf of Mexico (GOM), Oil and Gas Lease Sales, Western Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-28

    ...-Stewardship/Environmental-Assessment/NEPA/nepaprocess.aspx . Comments: Federal, State, and local government... Assessment Section, Office of Environment (GM 623E), Bureau of Ocean Energy Management, Gulf of Mexico OCS... (NOA) of the Draft Supplemental Environmental Impact Statement (EIS) and Public Meetings. SUMMARY: BOEM...

  3. 75 FR 36091 - Notice of Availability of the Draft Environmental Impact Statement for Improvements to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... for Improvements to the Calexico West Port of Entry, Calexico, CA AGENCY: Public Buildings Service... Impact Statement (EIS) for Improvements to the Calexico West Port of Entry, Calexico, California, for... and soils) or topic area (e.g., traffic, environmental justice). After the public comment period...

  4. 33 CFR Appendix C to Part 230 - Notice of Intent To Prepare a Draft EIS

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... intent should be processed through local Chief, Information Management channels to: HQDA, SFIS-APP, ATTN...) WASH DC 20314-1000 by 1 June of each year. Consult the local chief, Information Management for... Register. The following information is furnished for preparation and publication of notices of intent in...

  5. 77 FR 62528 - Termination of Environmental Impact Statement for the General Management Plan, Mount Rushmore...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... environmental impact statement (EIS) for the Mount Rushmore National Memorial General Management Plan (GMP) and will be preparing an Environmental Assessment (EA) instead. DATES: The draft GMP EA is expected to be... the appropriate level of environmental documentation for the GMP. Preliminary analysis of alternatives...

  6. 76 FR 55728 - Notice of the Extension of the Comment Period for the Draft Environmental Impact Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... High-Speed Train Project Fresno to Bakersfield Section AGENCY: Federal Railroad Administration (FRA... Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Fresno to... lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency...

  7. 78 FR 37216 - Sabine River Authority of Texas and Sabine River Authority, State of Louisiana; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Environmental Impact Statement for the Toledo Bend Hydroelectric Project In accordance with the National... Office of Energy Projects has reviewed the application for license for the Toledo Bend Hydroelectric... the Toledo Bend Project. The draft EIS documents the views of governmental agencies, non- governmental...

  8. Differential expression of upstream stimulatory factor (USF) 2 variants in eutopic endometria from women with endometriosis: estradiol regulation.

    PubMed

    Castro, Jazmin; Araya, Germán; Inostroza, Pamela; Hidalgo, Paulina; González-Ramos, Reinaldo; Sovino, Hugo; Boric, M Angélica; Fuentes, Ariel; Johnson, M Cecilia

    2015-10-09

    Endometriosis, pro-inflammatory and invasive benign disease estrogen dependent, abnormally express in endometria the enzyme P450Arom, positively regulated by steroid factor-1 (SF-1). Our objective was to study the nuclear protein contents of upstream stimulating factor 2 (USF2a and USF2b), a positive regulator of SF-1, throughout the menstrual cycle in eutopic endometria from women with and without (control) endometriosis and the involvement of nuclear estrogen receptors (ER) and G-coupled protein estrogen receptor (GPER)-1. Upstream stimulating factor 2 protein contents were higher in mid (USF2b) and late (USF2a and USF2b) secretory phase in eutopic endometria from endometriosis than control (p < 0.05). In isolated control epithelial cells incubated with E2 and PGE2, to resemble the endometriosis condition, the data showed: (a) significant increase of USF2a and USF2b nuclear protein contents when treated with E2, PPT (specific agonist for ERα) or G1 (specific agonist for GPER1); (b) no increase in USF2 binding to SF-1 E-Box/DNA consensus sequence in E2-treated cells; (c) USF2 variants protein contents were not modified by PGE2; (d) SF-1 nuclear protein content was significantly higher than basal when treated with PGE2, E2 or G1, stimulation unaffected by ICI (nuclear ER antagonist); and (e) increased (p < 0.05) cytosolic protein contents of P450Arom when treated with PGE2, E2, PPT or G1 compared to basal, effect that was additive with E2 + PGE2 together. Nevertheless, in endometriosis cells, the high USF2, SF-1 and P450Arom protein contents in basal condition were unmodified. These data strongly suggest that USF2 variants and P450Arom are regulated by E2 through ERα and GPER1, whereas SF-1 through GPER1, visualized by the response of the cells obtained from control endometria, being unaffected the endogenously stimulated cells from endometriosis origin. The lack of E2 stimulation on USF2/SF-1 E-Box/DNA-sequence binding and the absence of PGE2 effect on USF2 variants opposite to the strong induction that they exert on SF1 and P450 proteins suggest different mechanisms and indirect regulations. The sustained USF2 variants protein expression during the secretory phase in eutopic endometria from women with endometriosis may participate in the pathophysiology of this disease strongly associated with infertility and its characteristic endometrial invasion to ectopic sites in the pelvic cavity.

  9. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ...We, the U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game (CDFG), in cooperation with the Sonoma Land Trust (SLT), announce that a final environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and Watershed Restoration Project is now available. The final EIR/EIS, which we prepared and now announce in accordance with the National Environmental Policy Act of 1969 (NEPA), describes the restoration of approximately 2,300 acres (ac) of former farmland located in Sonoma County, California, near the San Pablo Bay. The final EIR/EIS responds to all comments we received on the draft document. The restoration project, which would be implemented by the SLT, would restore natural estuarine ecosystems on diked baylands, while providing public access and recreational and educational opportunities compatible with ecological and cultural resources protection. The U.S. Army Corps of Engineers, San Francisco District, and the National Marine Fisheries Service of the National Oceanic and Atmospheric Administration are cooperating agencies on the final EIR/EIS.

  10. 78 FR 7808 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Buffalo Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... amended, the Bureau of Land Management (BLM) Mount Lewis Field Office, Battle Mountain, Nevada, intends to... Buffalo Valley Mine Project, a proposed open pit gold mine, mill, and associated facilities, located on..._mountain_field.html . In order to be considered during the preparation of the Draft EIS, all comments must...

  11. 77 FR 39489 - Notice of Public Meetings for the Naval Air Station Key West Airfield Operations Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... via the U.S. Postal Service to Naval Facilities Engineering Command Southeast, NAS Key West Air... the project Web site ( http://www.keywesteis.com ). All statements, oral or written, submitted during... Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30, Building 903, NAS...

  12. 78 FR 46925 - Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Snapper-Grouper Fishery off the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... preparation of a draft environmental impact statement (EIS) to an EA for Regulatory Amendment 14. FOR FURTHER... of No Significant Impact (FONSI), the EA and FONSI will be the final environmental documents required by NEPA. If the EA reveals that significant environmental impacts may be reasonably expected to...

  13. 77 FR 53231 - Final Environmental Impact Statement for the Odessa Subarea Special Study-Columbia Basin Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... scope of the action alternative which include acreage, water supply, and general site locations would... authorized boundary with a surface water supply as part of continued phased development of the CBP. The... alternative impacts considered in the Draft EIS. Two water supply options are being considered that would use...

  14. 77 FR 11084 - Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Environmental Impact Statement/ Environmental Impact Report for the Proposed Cambria Water Supply Project, San... Report (EIS/EIR) to study, plan, and implement a project to provide for a reliable water supply for the... the area relying solely upon local groundwater for its current water supply. The groundwater supplies...

  15. 76 FR 5580 - Eagle Crest Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments on the proposed water supply pipeline and the draft EIS. Additionally, as discussed below, we will be...

  16. 76 FR 5198 - Notice of Availability of the Draft Environmental Impact Statement for the Salt Wells Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ...), for proposed geothermal energy projects covering a combined area of approximately 24,152 acres in the... Environmental Impact Statement for the Salt Wells Energy Projects, Churchill County, NV AGENCY: Bureau of Land... Environmental Impact Statement (EIS) for the Salt Wells Energy Projects and by this notice is announcing the...

  17. 78 FR 29124 - Draft Environmental Impact Statement (EIS) for the Implementation of Energy, Water, and Solid...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... plant (Alternative 4); construction and operation of a geothermal energy facility (Alternative 5); and... Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort Bliss, Texas and New Mexico... proposes to implement Net Zero energy, water and waste initiatives by 2020 at Fort Bliss to meet mandates...

  18. 77 FR 16058 - Willapa National Wildlife Refuge, Pacific County, WA; Record of Decision for Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ... National Wildlife Refuge System, consistent with sound principles of fish and wildlife management... implementation. Alternative 2 is the foundation of our CCP. The CCP will guide our management and administration... management issues in our Draft and Final CCP/EIS. To address these issues, we developed and evaluated three...

  19. 75 FR 9573 - Minnkota Power Cooperative, Inc: Bemidji-Grand Rapids 230kV Transmission Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... Rapids 230kV Transmission Project AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability... copy of the Draft EIS may be viewed online at the following Web sites: http://www.usda.gov/rus/water..., Longville, MN 56655; Walker Public Library, 207 4th St., Walker, MN 56484; Bovey Public Library--Village...

  20. 75 FR 23253 - Notice of Intent To Prepare a Draft Environmental Impact Statement (EIS) for the Central Palm...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... reach. The County has nourished the project area dune toes on several occasions and has planted native dune vegetation at several locations. Due to the narrow beach profile, much of this effort has been... nourishment and dune restoration through filling activities, groins, segmented submerged breakwaters, upland...

  1. 77 FR 51568 - Outer Continental Shelf, Gulf of Mexico, Oil and Gas Lease Sales, Western Planning Area Lease...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Western Planning Area (WPA) Lease Sale 233 and Central Planning Area (CPA) Lease Sale 231 (WPA/CPA... is reopening the scoping comment period. DATES: Scoping comments for this Draft WPA/CPA Supplemental...-opening of the scoping process for the WPA/CPA Supplemental EIS. Throughout the scoping process, Federal...

  2. 75 FR 7570 - Notice of Public Hearings for the Draft Environmental Impact Statement for the Silver Strand...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... Impact Statement for the Silver Strand Training Complex, San Diego, CA; Correction AGENCY: Department of... Impact Statement for the Silver Strand Training Complex, San Diego, CA. The document contained incorrect.... Kent Randall, SSTC EIS Project Manager, 1220 Pacific Highway, Building 1, 5th Floor, San Diego, CA...

  3. 75 FR 10307 - Notice of Availability of a Draft Environmental Impact Statement for Cape Hatteras National Seashore

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... for the Cape Hatteras National Seashore (Seashore) Off-Road Vehicle Management Plan (Plan/EIS). The... off-road vehicle (ORV) use/access in the Seashore to protect and preserve natural and cultural... among various users, and to promote the safety of all visitors. Executive Order 11644 of 1972, amended...

  4. 77 FR 11085 - Intent To Prepare a Draft Environmental Impact Statement (EIS) for the Installation of a Terminal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... (western side) and conducting supplemental sand placement along the eastern end of the island. Final locations and placement of sand will be determined during the project design process. For the groin... mammals, birds, fish, and plants. c. Potential impacts associated with using inlets as a sand source. d...

  5. The impact of therapeutic delay time on acute scintigraphic lesion and ultimate scar formation in children with first febrile UTI.

    PubMed

    Oh, Mi Mi; Kim, Jin Wook; Park, Min Gu; Kim, Je Jong; Yoo, Kee Hwan; Moon, Du Geon

    2012-03-01

    We assessed the role of therapeutic delay time (TDT) in acute renal cortical scintigraphic lesion (ASL) and ultimate scar formation (USF) in children with first febrile UTI and whether it is affected by the presence of vesico-ureteral reflux (VUR). 230 children, 90 girls and 140 boys with first febrile UTI were included. Radiologic (USG, DMSA, and VCUG), clinical (age, gender, peak fever, therapeutic delay time) and laboratory (CBC with differential count, ANC (absolute neutrophil count), BUN, Creatinine, urine analysis, gram stain, culture, CRP and ESR) variables were analysed. DMSA was performed within 5 days and after six months. VCUG was performed after acute phase of UTI. The differences in TDT according to the presence of ASL, USF and VUR were assessed. And the correlation between ASL or USF with the duration of TDT was assessed. Of 230 patients enrolled, 142 patients had refluxing UTI and 88 patients had non-refluxing UTI. TDT was the risk factor associated with ASL and USF along with presence of VUR. TDT was longer in ASL positive group compared with the ASL negative group. Also USF group showed longer TDT compared with those without USF in both refluxing UTI and non refluxing UTI. The TDT was significantly shorter in USF group with the presence of VUR. Positive linear association was noted between prevalence of ASL and USF and duration of TDT. In conclusion, the impact of UTI on formation of USF may be enhanced by the presence of VUR with shorter duration of TDT.

  6. Techniques to Improve Ultrasound-Switchable Fluorescence Imaging

    NASA Astrophysics Data System (ADS)

    Kandukuri, Jayanth

    Novel approaches to the improvement of ultrasound-switchable fluorescence (USF) imaging--a relatively new imaging modality that combines ultrasound and optical imaging techniques--have been proposed for early cancer detection. In USF, a high-intensity focused ultrasound (HIFU) beam is used to induce temperature rise within its acoustic focal region due to which a thermo-sensitive USF contrast agent undergoes a switch in its state by increasing the output of fluorescence photons. By using an increase in fluorescence, one can isolate and quantify the fluorescence properties within the ultrasonic focal area. Therefore, USF is able to provide fluorescence contrast while maintaining ultrasound resolution in tissue. The major challenge of the conventional USF technique is its low axial resolution and its sensitivity (i.e. its signal-to-noise ratio (SNR)). This work focuses on investigating and developing a novel USF system design that can improve the resolution and SNR of USF imaging for biological applications. This work can be divided into two major parts: characterizing the performance of a high-intensity focused ultrasound transducer; and improving the axial resolution and sensitivity of the USF technique. Preliminary investigation was conducted by using an IR camera setup to detect temperature variation and thereby study the performance of the high-intensity focused ultrasound transducer to quantify different parameters of ultrasound-induced temperature focal size (UTFS). Investigations are conducted for the purpose of high-resolution imaging with an emphasis on HIFU-induced thermal focus size, short duration of HIFU-induced temperature increase (to avoid thermal diffusion or conduction), and control of HIFU-induced temperature increase within a few degrees Celsius. Next, the focus was shifted to improving the sensitivity of the ultrasound-switchable fluorescence-imaging technique. In this study, the USF signal is encoded with the modulation frequency of the ultrasound by modulating the induced temperature. Later, two approaches were adopted to modify the USF design to improve the resolution of the conventional USF imaging technique. The first approach aims to improve the axial resolution of conventional USF technique, which involves changing the USF system to adopt a dual-HIFU transducer arrangement (in which the transducers are 90 degree with respect to each other) for use as the heating source. The overlapped region of the two crossed foci (OR-TCF) of the dual-HIFU transducer module is expected to have small thermal size along both lateral and axial directions; thus, it could improve the axial resolution of the USF imaging technique. The second approach aims to demonstrate the improvement of resolution via a single-element HIFU transducer with a high frequency (15 MHz). The high frequency of the ultrasound transducer would have smaller acoustic lateral and axial size and should therefore have smaller thermal size. Thus, both approaches should be able to reduce the focal region of heating and thereby improve the resolution of the USF imaging. Results show that the driving power and exposure time of the HIFU transducer significantly influence the ultrasound-induced temperature focal size (UTFS). Interestingly, a nonlinear acoustic effect was observed at certain variations of the ultrasound exposure power while satisfying the thermal confinement within UTFS. This has been shown to reduce UTFS beyond the acoustic diffraction limit, while the ultrasound-induced thermal energy, which is confined within the focal volume, can induce a desired peak-temperature increase of a few degrees. On other hand, after encoding the HIFU exposure and therefore the detected USF signal with a modulation frequency, the SNR (sensitivity) and full width at half maximum (FWHM) along the lateral direction of the USF image was calculated to be 114 and 0.95 mm for a micro-tube with an inner diameter of 0.31 mm (ID), respectively. In comparison, they are 95 and 1.1 mm when using a non-modulated conventional USF imaging technique. In the case of improving the axial resolution of USF imaging for a similar target size, the dual-HIFU USF design was able to achieve 1.07 and 1.5 mm along lateral (x ) and axial (z) directions, respectively. Adopting the second approach of using single 15 MHz HIFU transducer for USF imaging, the axial resolution was calculated to be 0.67+/-0.02 mm and 1.71+/-0.24 mm along lateral (x) and axial (z) directions, respectively. Thus, high-resolution ultrasound-switchable fluorescence with good sensitivity can be designed for biomedical applications.

  7. New generation ICG-based contrast agents for ultrasound-switchable fluorescence imaging

    PubMed Central

    Yu, Shuai; Cheng, Bingbing; Yao, Tingfeng; Xu, Cancan; Nguyen, Kytai T.; Hong, Yi; Yuan, Baohong

    2016-01-01

    Recently, we developed a new technology, ultrasound-switchable fluorescence (USF), for high-resolution imaging in centimeter-deep tissues via fluorescence contrast. The success of USF imaging highly relies on excellent contrast agents. ICG-encapsulated poly(N-isopropylacrylamide) nanoparticles (ICG-NPs) are one of the families of the most successful near-infrared (NIR) USF contrast agents. However, the first-generation ICG-NPs have a short shelf life (<1 month). This work significantly increases the shelf life of the new-generation ICG-NPs (>6 months). In addition, we have conjugated hydroxyl or carboxyl function groups on the ICG-NPs for future molecular targeting. Finally, we have demonstrated the effect of temperature-switching threshold (Tth) and the background temperature (TBG) on the quality of USF images. We estimated that the Tth of the ICG-NPs should be controlled at ~38–40 °C (slightly above the body temperature of 37 °C) for future in vivo USF imaging. Addressing these challenges further reduces the application barriers of USF imaging. PMID:27775014

  8. 76 FR 68501 - Notice of Availability and Notice of Hearing for the Alton Coal Tract Coal Lease by Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... Availability and Notice of Hearing for the Alton Coal Tract Coal Lease by Application Draft Environmental... Impact Statement (EIS) for the Alton Coal Tract Lease by Application (LBA) and by this Notice is... the Fair Market Value (FMV) of the Federal coal resources. DATES: To ensure comments will be...

  9. 76 FR 5396 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Rising Tree Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Rising Tree Wind Farm... on issues and alternatives related to the Rising Tree Wind Farm Draft EIS/EIR and possible CDCA PA by...-megawatt Rising Tree Wind Farm. The proposed project is approximately three miles west of the town of...

  10. 75 FR 43551 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Mohave County Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... Dam. The project will consist of up to 335 wind turbine generators (WTGs). Construction may consist of... County Wind Farm Project, Mohave County, AZ AGENCY: Bureau of Land Management, Interior. ACTION: Notice....gov/az/st/en/prog/energy/wind/mohave.html . In order to be included in the Draft EIS, all comments...

  11. 75 FR 16828 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed West Butte...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... construction of up to 52 wind turbines and ancillary facilities. The project is 25 miles southeast of Bend... Butte Wind Power Right-of-Way, Crook and Deschutes Counties, OR AGENCY: Bureau of Land Management... Statement (EIS) for the West Butte Wind Power Right-of-Way and by this notice is announcing the opening of...

  12. 77 FR 35999 - Notice of Availability of the Proposed Resource Management Plan/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... addressed in the Draft EIS, including Sentinel Plain. In response, the BLM completed its inventory for... 1610.5-2. Emailed and faxed protests will not be accepted as valid protests unless the protesting party.... Authority: 40 CFR 1506.6 and 1506.10, 43 CFR 1610.2 and 1610.5. Raymond Suazo, Arizona State Director. [FR...

  13. Cooper Lake and Channels, Texas.

    DTIC Science & Technology

    1977-04-01

    maintenance. Adverse esthetic impacts of the channel and levees. Inundation of some 90 archeo- logical sites which have been tested to the extent...below the reservoir was approximately ’,0 percent complete. In June 1976, the draft environmental impact statement (EIS) was coordinated for review and...construction necessitates cutting off natural channel bends. 3. a. Environmental Impacts : (I) Reservoir. The flood storage space in the approved

  14. 78 FR 54669 - Draft Environmental Impact Statement for the Proposed RES Americas Moapa Solar Energy Center...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... Environmental Impact Statement for the Proposed RES Americas Moapa Solar Energy Center, Clark County, Nevada... environmental impact statement (DEIS) for the proposed RES Americas Moapa Solar Energy Center on the Moapa River... Progress and on the following Web site: www.MoapaSolarEnergyCenterEIS.com . In order to be fully considered...

  15. 76 FR 66079 - Notice of Intent To Prepare a Supplemental Draft Environmental Impact Statement for the K Road...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    .../barstow/K Road_ Calico_Solar.html. E-mail: CalicoPV[email protected] . Fax: (760) 252-6098. Mail: Bureau of... Calico Solar Project, San Bernardino County, CA AGENCY: Bureau of Land Management, Interior. ACTION... Statement (EIS) for an amendment to the right-of- way (ROW) grant for the K Road Calico Solar Project...

  16. 77 FR 58530 - Intent To Prepare a Draft Environmental Impact Statement (EIS) for the Installation of a Terminal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... end range from 4-8 feet a year based on the latest shoreline change update developed by the NC Division of Coastal Management. The overall length of the terminal groin could range from 800-1,000 feet; however, the final dimensions of the structure could differ following detailed engineering design. The...

  17. 78 FR 54674 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Gold Rock Mine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... the Proposed Gold Rock Mine Project, White Pine County, NV AGENCY: Bureau of Land Management, Interior... participation upon publication of the Draft EIS. ADDRESSES: You may submit comments related to the Gold Rock Mine Project by any of the following methods: Email: BLM_NV_EYDO_Midway_Gold_Rock[email protected] Fax: 775...

  18. 76 FR 82320 - Extension of Public Scoping Period for the Draft Environmental Impact Statement for Adoption of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service... Impact Statement (EIS) for Adoption of a Long-term Experimental and Management Plan (LTEMP) for the Operation of Glen Canyon Dam to January 31, 2012. The Notice to Solicit Comments and Hold Public Scoping...

  19. 76 FR 11522 - Nuclear Innovation North America LLC; Notice of Availability of the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... Regulatory Commission (NRC) and the U.S. Army Corps of Engineers as a cooperating agency have published a... Licenses (COLs) at the South Texas Project Electric Generating Station Units 3 and 4: Final Report'' for the South Texas Project Electric Generating Station Units 3 and 4 COL application. The draft EIS was...

  20. Review of the Final EIS/EIR and HCP/SYP for the Headwaters Forest Project

    Treesearch

    Leslie M. Reid

    1999-01-01

    These comments are arranged to follow the pattern used by Reid (1998a) to allow convenient comparison with the original comments concerning the draft plan. Because of the dominating role played by alterations to sediment, woody debris and water regimes in the generation of cumulative watershed impacts, these components are discussed first. New information concerning...

  1. 77 FR 2513 - Draft Environmental Impact Statement for Effects of Oil and Gas Activities in the Arctic Ocean

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... Environmental Impact Statement for Effects of Oil and Gas Activities in the Arctic Ocean AGENCY: National Marine... Environmental Impact Statement (DEIS) for the Effects of Oil and Gas Activities in the Arctic Ocean.'' Based on... Web page at: http://www.nmfs.noaa.gov/pr/permits/eis/arctic.htm . FOR FURTHER INFORMATION CONTACT...

  2. 76 FR 7877 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Lost Creek In Situ...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Lost Creek In Situ Uranium Recovery Project in Sweetwater County, WY AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... the Draft EIS. ADDRESSES: You may submit comments related to the Lost Creek In Situ [[Page 7878...

  3. 75 FR 34709 - Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... and H.P. Wright Library Branch. The Final EIS/EIR is available at the Corps' Web site: http://www.spl... includes a draft general conformity determination (see Section 3.2, Section 4.7 and Appendix D.7), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because...

  4. 76 FR 57728 - Texas Eastern Transmission, LP, Algonquin Gas Transmission, LLC; Notice of Availability of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... protection regulation at two existing M&R stations; Installation of three pig launchers and two pig receivers, relocation of four pig receivers, and removal of two pig launchers; Installation of four mainline and three... to accommodate a temporary pig receiver. The draft EIS has been placed in the public files of the...

  5. Phosphorylation-dependent down-regulation of apolipoprotein A5 by insulin

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nowak, Maxine; Helleboid-Chapman, Audrey; Jakel, Heidelinde

    2004-02-15

    The apolipoprotein A5 (APOA5) gene has been shown to be important in lowering plasma triglyceride levels. Since several studies have shown that hyperinsulinemia is associated with hypertriglyceridemia, we sought to determine whether APOA5 gene is regulated by insulin. We show here that cell and mouse treatments with insulin down-regulated APOA5 expression in a dose-dependent manner. Furthermore, we determined that insulin decreases APOA5 promoter activity and subsequent deletion analyses revealed an E-box-containing fragment. We showed that Upstream Stimulatory Factors, USF1/USF2, bind to the identified E-box in the APOA5 promoter. Moreover, in cotransfection studies, USF1 stimulates APOA5 promoter activity. The treatment withmore » insulin reduces the binding of USF1/USF2 to APOA5 promoter. The inhibition of PI3K pathway with wortmannin abolished the insulin s effect on APOA5 gene transcription. Using oligoprecipitation method of USF from nuclear extracts, we demonstrated that phosphorylated USF1 failed to bind to APOA5 promoter. This indicates that the APOA5 gene transrepression by insulin involves a phosphorylation of USF through PI3K, that modulate their binding to APOA5 promoter and results in APOA5 down-regulation. The effect of exogenous hyperinsulinemia in healthy men shows a decrease of the plasma ApoAV level. These data suggest a potential mechanism involving APOA5 gene in hypertriglyceridemia associated with hyperinsulinemia.« less

  6. University of South Florida System Annual Accountability Report, 2013-14

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    This statistical report provides data tables on the University of South Florida System's (USF's) financial resources, personnel, enrollment, undergraduate education, graduate education, and research & economic development. Highlights of USF's achievements in the 2013-2014 academic year include: (1) In Tampa, USF celebrated its strongest…

  7. 76 FR 80941 - Request for Connect America Fund Cost Models

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... interested parties to submit forward-looking cost models, consistent with the USF/ICC Transformation Order... forward-looking cost model consistent with the USF/ICC Transformation Order no later than December 30.... SUPPLEMENTARY INFORMATION: 1. On November 18, 2011, the Commission released the USF/ICC Transformation Order, 76...

  8. University of South Florida Libraries Search Committee Procedure Handbook.

    ERIC Educational Resources Information Center

    Heilos, Lawrence J.; And Others

    This handbook of procedures developed by the Committee on Professional Concerns (COPC) of the University of South Florida (USF) describes the process to be used in recruiting and hiring qualified candidates for positions on the USF library faculty. The publication is divided into six sections: (1) information on the USF equal employment…

  9. A Dual-Modality System for Both Multi-Color Ultrasound-Switchable Fluorescence and Ultrasound Imaging

    PubMed Central

    Kandukuri, Jayanth; Yu, Shuai; Cheng, Bingbing; Bandi, Venugopal; D’Souza, Francis; Nguyen, Kytai T.; Hong, Yi; Yuan, Baohong

    2017-01-01

    Simultaneous imaging of multiple targets (SIMT) in opaque biological tissues is an important goal for molecular imaging in the future. Multi-color fluorescence imaging in deep tissues is a promising technology to reach this goal. In this work, we developed a dual-modality imaging system by combining our recently developed ultrasound-switchable fluorescence (USF) imaging technology with the conventional ultrasound (US) B-mode imaging. This dual-modality system can simultaneously image tissue acoustic structure information and multi-color fluorophores in centimeter-deep tissue with comparable spatial resolutions. To conduct USF imaging on the same plane (i.e., x-z plane) as US imaging, we adopted two 90°-crossed ultrasound transducers with an overlapped focal region, while the US transducer (the third one) was positioned at the center of these two USF transducers. Thus, the axial resolution of USF is close to the lateral resolution, which allows a point-by-point USF scanning on the same plane as the US imaging. Both multi-color USF and ultrasound imaging of a tissue phantom were demonstrated. PMID:28165390

  10. 76 FR 82319 - Gulf of Mexico (GOM), Outer Continental Shelf (OCS), Western Planning Area (WPA) and Central...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... Continental Shelf (OCS), Western Planning Area (WPA) and Central Planning Area (CPA), Oil and Gas Lease Sales... prepared a Draft EIS on oil and gas lease sales tentatively scheduled in 2012-2017 in the WPA and CPA... scheduled for the WPA and five annual areawide lease sales are scheduled for the CPA. The proposed WPA lease...

  11. 76 FR 79228 - Combined Licenses at William States Lee III Nuclear Station Site, Units 1 and 2; Duke Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... William States Lee III Nuclear Station Site, Units 1 and 2; Duke Energy Carolinas, LLC AGENCY: Nuclear... Statement for Combined Licenses (COL) for William States Lee III Nuclear Station Units 1 and 2 [Lee Nuclear... draft EIS can be accessed online at the NRC's William States Lee III Nuclear Site Web page at http://www...

  12. The USF Libraries Virtual Library Project: A Blueprint for Development.

    ERIC Educational Resources Information Center

    Metz-Wiseman, Monica; Silver, Susan; Hanson, Ardis; Johnston, Judy; Grohs, Kim; Neville, Tina; Sanchez, Ed; Gray, Carolyn

    This report of the Virtual Library Planning Committee (VLPC) is intending to serve as a blueprint for the University of South Florida (USF) Libraries as it shifts from print to digital formats in its evolution into a "Virtual Library". A comprehensive planning process is essential for the USF Libraries to make optimum use of technology,…

  13. Draft Environmental Impact Statement for the Ulysses Mission (Tier 2)

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Ulysses spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special(PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG). The potential effects considered in this EIS include risks of air and water quality impacts, local land area contamination, adverse health and safety impacts, the disturbance of biotic resources, impacts on wetland areas or areas containing historical sites, and socioeconomic impacts. Intensive analysis of the possible accidents associated with the proposed action are underway and preliminary results indicate small health or environmental risks. The results of a Final Safety Analysis Report will be available for inclusion into the final EIS.

  14. CpG methylation at the USF binding site mediates cell-specific transcription of human ascorbate transporter SVCT2 exon 1a

    PubMed Central

    Qiao, Huan; May, James M.

    2013-01-01

    SVCT2 is the major transporter mediating vitamin C uptake in most organs. Its expression is driven by two promoters (CpG-poor exon 1a promoter and CpG-rich exon 1b promoter). In this work we mapped discrete elements within the proximal CpG-poor promoter responsible for the exon 1a transcription. We identified two E boxes for USF binding and one Y box for NF-Y binding. We further show that the formation of an NFY/USF complex on the exon 1a promoter amplifies each other's ability to bind to the promoter in a cooperativity-dependent manner and is absolutely required for the full activity of the exon 1a promoter. The analysis of the CpG site located at the upstream USF binding site in the promoter showed a strong correlation between expression and demethylation. It was also shown that the exon 1a transcription was induced in cell culture treated with demethylating agent decitabine. The specific methylation of this CpG site impaired both the binding of USF and the formation of the functional NF-Y/USF complex as well as promoter activity, suggesting its importance for the cell-specific transcription. Thus CpG methylation at the upstream USF binding site functions in establishing and maintaining cell-specific transcription from the CpG-poor SVCT2 exon 1a promoter. PMID:21770893

  15. Tier One: Draft Environmental Impact Statement. Volume 1. Realignment of Mountain Home Air Force Base and Proposed Expanded Range Capability

    DTIC Science & Technology

    1990-02-01

    one of the most valuable assets in the Air Force inventory . This Tier 1 EIS is one tool designed to contribute to the decisionmaking process. The...M3.2-7 M3.2.5 Emission Inventories ...M3.5.3.2 Prehistoric Archaeological Resource Inventory ........................................................... M3.5-4 M3.5.4 Historic and Architectural

  16. 76 FR 59679 - Notice of Intent to Hold Public Meetings and Hear Public Comment on the Proposed New Jersey-New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... Street, NE, Room 2A, Washington, DC 20426, (202) 502-8371. CD-ROM copies of the draft EIS were mailed to.... A limited number of hard copies and CD-ROMs are available from the Public Reference Room identified above. Please note that copies of the CD-ROM were mailed with a postcard that included a docket number...

  17. 78 FR 40128 - Notice of Intent to Prepare a Draft Environmental Impact Statement (EIS) for the Reaches 8, 9...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... to R-134+135. The Town proposes to place approximately 74,300 cubic yards of beach quality sand in... beach quality sand is proposed to be placed between R-134+135 and R-135+551 to elevate the existing berm... and dune restoration projects between R-128+955 and R-138+551 with sand placement and the construction...

  18. 78 FR 33394 - Notice To Extend Submittal Date for Scoping Comments for United States Air Force Main Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-04

    ...The U.S. Air Force is issuing this notice to advise the public of an extension to submit scoping comments. The initial Notice of Availability published in the Federal Register on May 17, 2013 (Vol. 78, No. 96/Notices/29120), requested public scoping comments no later than June 10, 2013. The Air Force has extended the deadline for submitting public comments to July 5, 2013. All substantive scoping comments received during the public scoping period will be considered in the preparation of the Draft EIS. Point of Contact: Please direct any written comments or requests for information to KC-46A EIS Project Manager, National Guard Bureau, NGB/A7AM, 3501 Fetchet Avenue, Joint Base Andrews, Maryland, 20762- 5157.

  19. Crime in woods: role of law enforcement officers in national forests

    Treesearch

    Joanne F. Tynon; Deborah J. Chavez; Joshua W. R. Baur

    2010-01-01

    This first nationwide study of US Forest Service (USFS) law enforcement officers (LEOs) examined respondents’ roles in the USFS, what they perceived as their highest work priority, and what their relationship with the rest of the USFS should be. Results show that LEOs believe they have a high priority for protecting forest users and they believe that National Forest...

  20. A report on the Oregon Experiment: A grassroots approach to meaningful public involvement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blazek, M.L.; Dunning, D.A.; Gentry, R.

    In September and October 1995, the Oregon Department of Energy (ODOE) and the Oregon Hanford Waste Board (the Board) carried out an ambitious public involvement process. They set out to explore new ways to better involve the public in technical issues involving the US Department of Energy (USDOE). They selected the draft Programmatic Environmental Impact Statement (EIS) on the Storage and Disposition of Weapons-Usable Fissile Materials as the subject for the public involvement effort. They selected this EIS because of its high degree of technical complexity, its potential for impacting Hanford cleanup and Oregon, its broad reach of issues involvingmore » all USDOE sites and the long lead time it allowed for preparation. The traditional process used by USDOE for public involvement seldom allows external agencies sufficient lead time to develop good public involvement processes. For this EIS, USDOE began the public involvement process very early in the development of the EIS, which allowed them the lead time they needed. ODOE and the Board have a great deal of experience in working with the public on a wide range of nuclear issues. This project was larger and more complex than anything they had attempted before. They used several different forums and a common format. The public response was very positive and encouraging.« less

  1. Mapping Historic Gypsy Moth Defoliation with MODIS Satellite Data: Implications for Forest Threat Early Warning System

    NASA Technical Reports Server (NTRS)

    Spurce, Joseph P.; Hargrove, William; Ryan, Robert E.; Smooth, James C.; Prados, Don; McKellip, Rodney; Sader, Steven A.; Gasser, Jerry; May, George

    2008-01-01

    This viewgraph presentation reviews a project, the goal of which is to study the potential of MODIS data for monitoring historic gypsy moth defoliation. A NASA/USDA Forest Service (USFS) partnership was formed to perform the study. NASA is helping USFS to implement satellite data products into its emerging Forest Threat Early Warning System. The latter system is being developed by the USFS Eastern and Western Forest Threat Assessment Centers. The USFS Forest Threat Centers want to use MODIS time series data for regional monitoring of forest damage (e.g., defoliation) preferably in near real time. The study's methodology is described, and the results of the study are shown.

  2. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities basedmore » on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.« less

  3. Regulation of IL-10 expression by upstream stimulating factor (USF-1) in glioma-associated microglia.

    PubMed

    Zhang, Leying; Handel, Michelle Van; Schartner, Jill M; Hagar, Aaron; Allen, Grant; Curet, Marjorie; Badie, Behnam

    2007-03-01

    Understanding the local CNS immune response to neoplasms is essential in the development of immune-based treatments for malignant brain tumors. Using rodent glioma models, we have recently found tumor-associated microglia/macrophages (MG/MP) to be less responsive to known MG/MP activators such as CpG, LPS and IFN-gamma. To understand the mechanism of MG/MP suppression, nuclear extracts from rodent intracranial C6 gliomas, C6 glioma-associated MG/MP, normal brain, and normal MG/MP were obtained and studied using Electrophoretic Mobility Shift Assay (EMSA). Among the nuclear factors studied (AP-1, IRF, USF-1 and Stat-1) only USF-1, which is constitutively expressed in most cells, was down-regulated in tumor-associated MG/MP, but not normal MG/MP. Because tumor-associated MG/MP had higher expression of IL-10 (but not TNF-alpha or TGF-beta), we evaluated the role of USF-1 on IL-10 expression. siRNA mediated inhibition of USF-1 expression in primary MG/MP cultures resulted in up-regulation of IL-10 mRNA but not TNF-alpha or TGF-beta. These findings suggest that USF-1 may play a role in IL-10 regulation in MG/MP in brain tumors.

  4. Enhancing Ocean Literacy and Expertise of Diverse Populations via Graduate School Fellowship Opportunities

    NASA Astrophysics Data System (ADS)

    Mayo, M.; Ithier-Guzman, W.; Pyrtle, A. J.; Betzer, P.; Batson, B.; Bhansali, S.; Greene, B.; Turner, R.

    2007-05-01

    In 2004, the University of South Florida (USF) was granted by the National Science Foundation a Louis Stokes Alliance for Minority Participation (LSAMP) Bridge to the Doctorate (BD) site award (HRD# 0217675). As part of the Florida-Georgia Louis Stokes Alliance for Minority Participation (FGLSAMP), USF is one of thirteen institutions in an alliance that is dedicated to significantly increasing the number of underrepresented minority students who obtain undergraduate and graduate STEM degrees. The BD program at USF incorporates the goals of FGLSAMP and facilitates the recruitment of underrepresented minorities pursuing careers in the STEM fields at the graduate level. The thematic focus of the FGLSAMP USF BD program is focused on the development and application of biogeochemical sensors for marine, aquatic, environmental, remote sensing and biomedical applications. After recruitment, BD graduate fellowship recipients are provided with NSF-funded financial support for two years, and opportunities to participate in professional development workshops, seminars and short courses, as well as additional financial support to pursue and complete their doctoral studies (beyond the initial two years of NSF BD funding), in a variety of forms, including, but not limited to, Alfred P. Sloan Minority Scholarships, Florida Education Fund's McKnight Doctoral Fellowships, USF College of Graduate Studies Fellowships, USF CMS endowed fellowships, USF CMS research assistantships, and USF CMS teaching assistantships. Collectively, 3 LSAMP BD grants have been awarded at USF to support 56 underrepresented minority fellowship recipients, of which 14 are currently graduate students at the USF College of Marine Science (CMS). Since the arrival of the BD Fellowship program, the graduate community has diversified, showing an increase of over 40% in underrepresented minorities at CMS. The BD program has enhanced the research and learning environment for all CMS students, as well as fostered a nurturing community of underrepresented minority CMS graduate students committed to obtaining their doctoral degrees. As of spring 2007, a total of 4 BD fellowship recipients have obtained marine science master's degrees and are currently pursuing their doctoral degrees in the CMS. In addition, in less than two years, a BD endowment fund of more than $900,000 was established. This fund will provide financial support for at least two minority CMS graduate students in perpetuity! Lastly, in response to an identified need for increased ocean literacy among underrepresented groups, several BD fellowship recipients have engaged in activities designed to "give back" via informal and formal education and outreach opportunities within their native communities.

  5. Crescent City, California Inner Harbor Basin and Entrance Channel. Draft. Supplemental Environmental Impact Statement.

    DTIC Science & Technology

    1981-09-01

    Daniels Fisheries Bio- 3 Years EIS & Tech- Biologist (NIS Coordinator) logy, Applied nical Reports, Statistics U.S. Army Corps of Engineers Ed Kandler...policies that apply to the study area are discussed in the following paragraphs. Noncompliance of the detailed plans with these requirements are...for more efficient barge shipment of petroleum products into Crescent City Inner Harbor from the present to the year 2032. b. Improve the saftey

  6. 78 FR 16483 - Notice of Availability of the Draft Uranium Leasing Program Programmatic Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ...The U.S. Department of Energy (DOE) announces the availability of the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS-0472D), for public comment. DOE is also announcing the dates, times, and locations for public hearings to receive comments on the Draft ULP PEIS. DOE has prepared the Draft ULP PEIS pursuant to the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality's (CEQ's) NEPA regulations (40 CFR parts 1500-1508), and DOE's NEPA implementing procedures (10 CFR part 1021) to analyze the reasonably foreseeable potential environmental impacts, including the site-specific impacts, of the range of reasonable alternatives for the management of the ULP. DOE's ULP administers 31 tracts of land covering an aggregate of approximately 25,000 acres (10,000 ha) in Mesa, Montrose, and San Miguel Counties in western Colorado for exploration, mine development, operations, and reclamation of uranium mines. The cooperating agencies on this ULP PEIS are the: U.S. Department of the Interior (DOI), Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado Department of Transportation; Colorado Division of Reclamation, Mining, and Safety; Colorado Parks and Wildlife ; Mesa County Commission; Montrose County Commission; San Juan County Commission; San Miguel County Board of Commissioners; Pueblo of Acoma Tribe; Pueblo de Cochiti Tribe; Pueblo de Isleta Tribe; Navajo Nation; and Southern Ute Indian Tribe.

  7. STAT3 or USF2 Contributes to HIF Target Gene Specificity

    PubMed Central

    Pawlus, Matthew R.; Wang, Liyi; Murakami, Aya; Dai, Guanhai; Hu, Cheng-Jun

    2013-01-01

    The HIF1- and HIF2-mediated transcriptional responses play critical roles in solid tumor progression. Despite significant similarities, including their binding to promoters of both HIF1 and HIF2 target genes, HIF1 and HIF2 proteins activate unique subsets of target genes under hypoxia. The mechanism for HIF target gene specificity has remained unclear. Using siRNA or inhibitor, we previously reported that STAT3 or USF2 is specifically required for activation of endogenous HIF1 or HIF2 target genes. In this study, using reporter gene assays and chromatin immuno-precipitation, we find that STAT3 or USF2 exhibits specific binding to the promoters of HIF1 or HIF2 target genes respectively even when over-expressed. Functionally, HIF1α interacts with STAT3 to activate HIF1 target gene promoters in a HIF1α HLH/PAS and N-TAD dependent manner while HIF2α interacts with USF2 to activate HIF2 target gene promoters in a HIF2α N-TAD dependent manner. Physically, HIF1α HLH and PAS domains are required for its interaction with STAT3 while both N- and C-TADs of HIF2α are involved in physical interaction with USF2. Importantly, addition of functional USF2 binding sites into a HIF1 target gene promoter increases the basal activity of the promoter as well as its response to HIF2+USF2 activation while replacing HIF binding site with HBS from a HIF2 target gene does not change the specificity of the reporter gene. Importantly, RNA Pol II on HIF1 or HIF2 target genes is primarily associated with HIF1α or HIF2α in a STAT3 or USF2 dependent manner. Thus, we demonstrate here for the first time that HIF target gene specificity is achieved by HIF transcription partners that are required for HIF target gene activation, exhibit specific binding to the promoters of HIF1 or HIF2 target genes and selectively interact with HIF1α or HIF2α protein. PMID:23991099

  8. Worldwide trends in Universal Service Funds and telemedicine.

    PubMed

    Nakajima, Isao

    2010-12-01

    A survey of recent worldwide trends in Universal Service Funds (USFs) and the assistance provided for their application indicates that industrialized countries and developing nations alike have offered or plan to offer tax-relief measures or reimbursement for communications costs incurred by telemedicine programs, thus finding a way to actively apply USFs in rural areas. There are three main systems used to calculate the amount of reimbursement from a USF. While many countries adopt a service-area net-loss estimation method, Japan uses a benchmark method and provides financial assistance only to unprofitable areas. The USA has proactively introduced telemedicine to rural areas and isolated islands in order to minimize rapidly rising healthcare costs and to improve the efficiency of healthcare services. In the USA, the USF is used to pay back communications costs incurred through telemedicine programs. For instance, the budget allocated from the USF for reimbursements for telemedicine in Alaska reached USD 30 Mil. in 2007. Developing countries in Africa and Asia are operating various forms of telemedicine on a trial basis, but a tax-relief measure or payback of communications costs, which are a large portion of the running costs, will need to be implemented to ensure sustainable and autonomous operation of telemedicine. In Japan, up until January 2007, the USF system assumed the use of an NTS (non-traffic sensitive cost) system to obtain funds from connection fees, and this system would receive funds from each telecommunications carrier (payer: the telecommunications carriers). The beneficiaries would be limited to two companies, namely NTT East and NTT West. However, the Japanese USF system was revised in February 2007, and a fee is now collected from each telephone number (payer: the user). The collected funds are used to cover losses in unprofitable areas (not limited to remote areas) among 7,000 business areas in Japan. In view of worldwide trends, the author believes that Japan should also start using the USF system to reimburse communications costs (including costs of telemedicine) in order to achieve sustainable and autonomous operation of public communication systems in rural areas.

  9. South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grisak, Grant; Marotz, Brian

    2003-06-01

    In 1999, Montana Fish, Wildlife & Parks (MFWP) began a program aimed at conserving the genetically pure populations of westslope cutthroat trout in the South Fork Flathead River drainage. The objective of this program is to eliminate all of the exotic and hybrid trout that threaten the genetically pure westslope cutthroat populations in the South Fork Flathead. The exotic and hybrid trout populations occur in several headwater lakes and their outflow streams. In 2001 MFWP released a draft environmental assessment, pursuant to the Montana Environmental Policy Act (MEPA), that addressed the use of motorized equipment to deliver personnel and materialsmore » to some of these lakes in the Bob Marshall and Great Bear Wildernesses (Grisak 2001). After a 30-day public comment period, MFWP determined that the complexity of issues was too great and warranted a more detailed analysis. These issues included transportation options for personnel, equipment and materials, the use of motorized equipment in wilderness, fish removal methods, fish stocking, and the status and distribution of amphibian populations in the project area. Because the program also involves the U.S. Forest Service (USFS) and Bonneville Power Administration (BPA), the environmental analysis needs to comply with the National Environmental Policy Act (NEPA). In October 2001, pursuant to NEPA, MFWP, along with the USFS and BPA initiated an environmental assessment to address these issues. In June 2002, the three agencies determined that the scope of these issues warranted an Environmental Impact Statement. This specialist report describes the logistical, technical and biological issues associated with this project and provides an analysis of options for fish removal, transportation and fish stocking. It further analyzes issues and concerns associated with amphibian populations and creating new domesticated stocks of westslope cutthroat trout. Finally, this document provides a description of each lake, the best method of fish removal that would achieve the goals of the project, logistics for carrying out the fish removal, and the immediate management direction for each lake following fish removal. The USFS is preparing a specialist report detailing land management issues that relate to National Forest, designated Hiking Areas, and Wilderness. Information from these two documents will be used by BPA to prepare an Environmental Impact Statement.« less

  10. PHOTOCOPY OF STANDARD USDA/USFS PLAN FOR 13' X 13' STEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PHOTOCOPY OF STANDARD USDA/USFS PLAN FOR 13' X 13' STEEL LOOKOUT HOUSE (CAB); ELEVATIONS, SECTIONS, MISC. DETAILS; DATED 1961 - North Mountain Lookout, Stanislaus National Forest, Groveland, Tuolumne County, CA

  11. 5-Hydroxymethylcytosine in E-box motifs ACAT|GTG and ACAC|GTG increases DNA-binding of the B-HLH transcription factor TCF4.

    PubMed

    Khund-Sayeed, Syed; He, Ximiao; Holzberg, Timothy; Wang, Jun; Rajagopal, Divya; Upadhyay, Shriyash; Durell, Stewart R; Mukherjee, Sanjit; Weirauch, Matthew T; Rose, Robert; Vinson, Charles

    2016-09-12

    We evaluated DNA binding of the B-HLH family members TCF4 and USF1 using protein binding microarrays (PBMs) containing double-stranded DNA probes with cytosine on both strands or 5-methylcytosine (5mC) or 5-hydroxymethylcytosine (5hmC) on one DNA strand and cytosine on the second strand. TCF4 preferentially bound the E-box motif (CAN|NTG) with strongest binding to the 8-mer CAG|GTGGT. 5mC uniformly decreases DNA binding of both TCF4 and USF1. The bulkier 5hmC also inhibited USF1 binding to DNA. In contrast, 5hmC dramatically enhanced TCF4 binding to E-box motifs ACAT|GTG and ACAC|GTG, being better bound than any 8-mer containing cytosine. Examination of X-ray structures of the closely related TCF3 and USF1 bound to DNA suggests TCF3 can undergo a conformational shift to preferentially bind to 5hmC while the USF1 basic region is bulkier and rigid precluding a conformation shift to bind 5hmC. These results greatly expand the regulatory DNA sequence landscape bound by TCF4.

  12. Environmental Impact Statement: Construction and Operation of Titan IV/Centaur Launch Complex, Vandenberg Air Force Base, California. Volume 3

    DTIC Science & Technology

    1990-08-01

    Form 7.10 Draft EIS Public Hearings Attendance and Speakers Lists 8.0 LIST OF ACRONYMS AND ABBREVIATIONS APPENDIX A: GLOBAL WARMING APPENDIX B: WHITE...expected to contribute significantly to global warming . Impacts to air quality from operations would be the same for the alternative sites. NOISE Noise...and Abbreviations List of Acronyms and Abbreviations used in the Final EM. ● Appendix A - Global Warming This appendix provides a brief discussion of

  13. Draft Environmental Impact Statement for Divert Activities and Exercises, Guam and Commonwealth of the Northern Mariana Islands

    DTIC Science & Technology

    2012-06-01

    information indicate that at least one designated use 22 (e.g., recreation, support of aquatic life and coral reef conservation, fishing and the consumption ...34 This EIS provides an analysis of environmental effects associated with the proposed action. The 35 following summarizes the formal NEPA process...alternatives and the No Action Alternative have been summarized in Table ES-2. A detailed analysis of 28 effects is provided in Chapter 4. 29 ES 7

  14. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build newmore » production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.« less

  15. Glucose Regulates the Expression of the Apolipoprotein A5 Gene

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fruchart, Jamila; Nowak, Maxime; Helleboid-Chapman, Audrey

    2008-04-07

    The apolipoprotein A5 gene (APOA5) is a key player in determining triglyceride concentrations in humans and mice. Since diabetes is often associated with hypertriglyceridemia, this study explores whether APOA5 gene expression is regulated by alteration in glucose homeostasis and the related pathways. D-glucose activates APOA5 gene expression in a time- and dose-dependent manner in hepatocytes, and the glycolytic pathway involved was determined using D-glucose analogs and metabolites. Together, transient transfections, electrophoretic mobility shift assays and chromatin immunoprecipitation assays show that this regulation occurs at the transcriptional level through an increase of USF1/2 binding to an E-box in the APOA5 promoter.more » We show that this phenomenon is not due to an increase of mRNA or protein expression levels of USF. Using protein phosphatases 1 and 2A inhibitor, we demonstrate that D-glucose regulates APOA5 gene via a dephosphorylation mechanism, thereby resulting in an enhanced USF1/2-promoter binding. Last, subsequent suppressions of USF1/2 and phosphatases mRNA through siRNA gene silencing abolished the regulation. We demonstrate that APOA5 gene is up regulated by D-glucose and USF through phosphatase activation. These findings may provide a new cross talk between glucose and lipid metabolism.« less

  16. Genetic Association and Interaction Analysis of USF1 and APOA5 on Lipid Levels and Atherosclerosis

    PubMed Central

    Laurila, Pirkka-Pekka; Naukkarinen, Jussi; Kristiansson, Kati; Ripatti, Samuli; Kauttu, Tuuli; Silander, Kaisa; Salomaa, Veikko; Perola, Markus; Karhunen, Pekka J.; Barter, Philip J.; Ehnholm, Christian; Peltonen, Leena

    2011-01-01

    Objective USF1 is a ubiquitous transcription factor governing the expression of numerous genes of lipid and glucose metabolism. APOA5 is a well-established candidate gene regulating triglyceride (TG) levels and has been identified as a downstream target of upstream stimulatory factor. No detailed studies about the effect of APOA5 on atherosclerotic lesion formation have been conducted, nor has its potential interaction with USF1 been examined. Methods and Results We analyzed allelic variants of USF1 and APOA5 in families (n=516) ascertained for atherogenic dyslipidemia and in an autopsy series of middle-aged men (n=300) with precise quantitative measurements of atherosclerotic lesions. The impact of previously associated APOA5 variants on TGs was observed in the dyslipidemic families, and variant rs3135506 was associated with size of fibrotic aortic lesions in the autopsy series. The USF1 variant rs2516839, associated previously with atherosclerotic lesions, showed an effect on TGs in members of the dyslipidemic families with documented coronary artery disease. We provide preliminary evidence of gene-gene interaction between these variants in an autopsy series with a fibrotic lesion area in the abdominal aorta (P=0.0028), with TGs in dyslipidemic coronary artery disease subjects (P=0.03), and with high-density lipoprotein cholesterol (P=0.008) in a large population cohort of coronary artery disease patients (n=1065) in which the interaction for TGs was not replicated. Conclusion Our findings in these unique samples reinforce the roles of APOA5 and USF1 variants on cardiovascular phenotypes and suggest that both genes contribute to lipid levels and aortic atherosclerosis individually and possibly through epistatic effects. PMID:19910639

  17. Catalyst Bed Instability Within the USFE H2O2/JP-8 Rocket Engine

    NASA Technical Reports Server (NTRS)

    Johnson, Curtis W.; Anderson, William; Ross, Robert; Lyles, G. (Technical Monitor)

    2000-01-01

    Orbital Sciences Corporation has been awarded a contract by NASA's Marshall Space Flight Center, in cooperation with the U.S. Air Force Research Laboratory's Military Space Plane Technology Program Office, for the Upper Stage Flight Experiment (USFE) program. Orbital is designing, developing, and will flight test a new low-cost, 10,000 lbf hydrogen peroxide/ JP-8 pressure fed liquid rocket. During combustion chamber tests at NASA Stennis Space Center (SSC) of the USFE engine, the catalyst bed showed a low frequency instability occurring as the H202 flow reached about 1/3 its design rate. This paper reviews the USFE catalyst bed and combustion chamber and its operation, then discusses the dynamics of the instability. Next the paper describes the dynamic computer model used to recreate the instability. The model was correlated to the SSC test data, and used to investigate possible solutions to the problem. The combustion chamber configuration which solved the instability is shown, and the subsequent stable operation presented.

  18. 78 FR 32991 - Connect America Fund

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ..., 2013. The full text of this document is available for public inspection during regular business hours.... Introduction 1. In the USF/ICC Transformation Order, 76 FR 73830, November 29, 2011, the Commission... the USF/ICC Transformation Order, an unsubsidized competitor in areas where the price cap carrier will...

  19. 77 FR 13257 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ..., Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Washington, DC, OIRA... Resource Management Plan (USFS 1990) and Upper McKenzie River Management Plan (``UMRMP,'' USFS 1992), (2...) inform management practices to protect and enhance the outstandingly remarkable values identified for the...

  20. Introduction [Chapter 1

    Treesearch

    S. Karen Dante-Wood

    2018-01-01

    The Northern Rockies Adaptation Partnership (NRAP) is a science-management partnership among the Forest Service, U.S. Department of Agriculture (USFS) regional offices and national forests (mostly in the Northern Region, and small portions of the Intermountain and Rocky Mountain Regions); USFS Pacific Northwest and Rocky Mountain Research Stations; Glacier, Yellowstone...

  1. Oyster Shell Dredging in Atchafalaya Bay and Adjacent Waters, Louisiana. Draft Environmental Impact Statement and Appendixes,

    DTIC Science & Technology

    1987-04-01

    importance with the development of the Atchafalaya Delta region (Thompson and Deegan , 1980). Although several works have been prepared which dealt with the...47:189-228. Craig , N.J., R.E. Turner, and J.W. Day, Jr. 1979. Land loss in coastal Louisiana (USA). J. Environ. Management 3(1): 133-144. Cratsley, D.W...University, Baton Rouge. 285 pp. EI-114 Thompson, B.A and L.A. Deegan . 1983. The Atchafalaya River delta: a "new" fishery nursery with recommendations for

  2. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 3. Public comments hearing board report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deepmore » hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains written public comments and hearing board responses and reports offered on the draft statement.« less

  3. Fire management assessment of Eastern Province, Zambia

    Treesearch

    L. T. Hollingsworth; D. Johnson; G. Sikaundi; S. Siame

    2015-01-01

    The mission that produced this assessment was prompted by requests from Forestry Department personnel in Zambia to the United States Agency for International Development (USAID) for formal fire management training. USAID contacted the United States Forest Service's (USFS) International Programs (IP) with the training request. Together, USFS, USAID, and Zambian...

  4. Introduction [Chapter 1

    Treesearch

    Joanne J. Ho

    2018-01-01

    The Intermountain Adaptation Partnership (IAP) is a science-management partnership with a wide variety of participants across the U.S. Department of Agriculture Forest Service (USFS) Intermountain Region, which spans Nevada, Utah, southern Idaho, eastern California, and western Wyoming. This USFS region is the largest in the Nation, representing nearly 17 percent of...

  5. 78 FR 76789 - Additional Connect America Fund Phase II Issues

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ... inspection and copying during normal business hours in the FCC Reference Information Center, Portals II, 445... Phase I to Phase II. 2. Timing of Phase II Support Disbursements. In the USF/ICC Transformation Order... language in paragraph 180 of the USF/ICC Transformation Order. We now seek to more fully develop the record...

  6. Florida Public Health Training Center: Evidence-Based Online Mentor Program

    ERIC Educational Resources Information Center

    Frahm, Kathryn A.; Alsac-Seitz, Biray; Mescia, Nadine; Brown, Lisa M.; Hyer, Kathy; Liburd, Desiree; Rogoff, David P.; Troutman, Adewale

    2013-01-01

    This article describes an Online Mentor Program (OMP) designed to support and facilitate mentorships among and between Florida Department of Health (FDOH) employees and USF College of Public Health students using a Web-based portal. The Florida Public Health Training Center (FPHTC) at the University of South Florida (USF) College of Public Health…

  7. Collaborative implementation for ecological restoration on US public lands: implications for legal context, accountability, and adaptive management

    Treesearch

    William H. Butler; Ashley Monroe; Sarah McCaffrey

    2015-01-01

    The Collaborative Forest Landscape Restoration Program (CFLRP), established in 2009, encourages collaborative landscape scale ecosystem restoration efforts on United States Forest Service (USFS) lands. Although the USFS employees have experience engaging in collaborative planning, CFLRP requires collaboration in implementation, a domain where little prior experience...

  8. A Study of Instructional Faculty Salaries at USF, SUS and National Peers

    ERIC Educational Resources Information Center

    Micceri, Theodore

    2010-01-01

    This study investigates 10-year trends in instructional faculty salaries by sex and rank for USF, five SUS Peers (UF, FSU, FIU, UCF, FAU) and eight National Peers (North Carolina State, Alabama-Birmingham, Illinois-Chicago, California-Irvine, SUNY-Stony Brook, SUNY-Buffalo, Cincinnati, Rutgers). Methods: Historical instructional faculty salary…

  9. View west from USFS Road 369 toward Fowler Lode Adit ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View west from USFS Road 369 toward Fowler Lode Adit and O'Brien Ditch (left) and open-pit excavation (top-center, beyond trees); ridge saddle is in center - Steamboat Mine, Southeast slope of Steamboat Mountain, west of the junction of Forest Service Roads 1000300 and 1000365, Jacksonville, Jackson County, OR

  10. USDA Forest Service goals and programs for monitoring neotropical migratory birds

    Treesearch

    Patricia Manley

    1993-01-01

    The USDA Forest Service (USFS) developed goals, objectives, and guidelines for monitoring neotropical migratory birds (NTMB) on National Forest System lands in response to the Neotropical Migratory Bird Conservation Program Partners in Flight. A USFS task group developed a hierarchical monitoring framework designed to define priorities for type of monitoring data....

  11. Money and Mentorship

    ERIC Educational Resources Information Center

    Lim, Victoria

    2008-01-01

    This article describes how the benefactors of University of South Florida (USF) Latino Scholarship Program (LSP) support students in more ways than one. LSP, now in its 17th year, was started by the Latin Community Advisory Committee to the USF president to attract Hispanic students to the school. The committee didn't want to just provide…

  12. Defining Old Growth: Implications For Management

    Treesearch

    David L. White; F. Thomas Lloyd

    1994-01-01

    USDA Forest Service (USFS), with the help of scientists from The Nature Conservancy (TNC), Forest Service Research and ther organizations, is developing old-growth definitions for 35 forest types within the Eastern United States (U.S.). Old-growth forests were officially recognized as a resource by the USFS in 1988 and shortly thereafter, the Eastern Old-Growth...

  13. National FIA plot intensification procedure report

    Treesearch

    Jock A. Blackard; Paul L. Patterson

    2014-01-01

    The Forest Inventory and Analysis (FIA) program of the U.S. Forest Service (USFS) measures a spatially distributed base grid of forest inventory plots across the United States. The sampling intensity of plots may be increased in some regions when warranted by specific inventory objectives. Several intensification methods have been developed within FIA and USFS National...

  14. The Applegate Adaptive Management Area ecosystem health assessment

    Treesearch

    Thomas Atzet

    1995-01-01

    As requested by the Applegate Partnership, the Medford District Bureau of Land Management, the Rogue River and Siskiyou National Forests, a team of six specialists (Dr. Tom Atzet, USFS ecologist; Dr. Mike Amaranthus, PNW soil scientist, Dr. Don Goheen, USFS pathologist and entomologist, Tom Sensenig, BLM silviculturist, Dr. Dave Perry, Oregon State University...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zeng, Yanli; Li, Hui; Zhang, Xiaoju

    Apolipoprotein B mRNA-editing enzyme catalytic polypeptide-like 3G (APOBEC3G, A3G) exert antiviral defense as an important factor of innate immunity. A variety of cytokines such as IFN-γ,IL2,IL15,IL7 could induce the transcription of A3G. However, the regulation of other nuclear factor on the transcription of A3G have not been reported at the present. To gain new insights into the transcriptional regulation of this restriction factor, we cloned and characterized the promoter region of A3G and investigate the modulation of USF1 gene on the transcription of A3G. We identified a 232 bp region that was sufficient to regulate the activity of full promoter. Transcriptionalmore » start sites (TSS) were identified by the luciferase reporter assays of plasmids containing full or shorter fragments of the A3G promoter. The results demonstrated that the core promoter of A3G is located within the region -159/-84 relative to the TSS. Transcriptional activity of A3G core promoter regulated by USF1 was dependent on an E-box (located at position -91/-86 relative to the major TSS) and was abolished after mutation of this DNA element. USF1 gene can take part in basal transcription regulation of the human A3G gene in hepatocyte, and the identified E-box represented a binding site for the USF1. - Highlights: • The core promoter of A3G is located within the region −159/−84 relative to the TSS. • Transcriptional activity of A3G core promoter regulated by USF1 was dependent on an E-box (located at position −91/−86 relative to the major TSS). • USF1 gene can take part in basal transcription regulation of the human A3G gene in hepatocyte.« less

  16. Learning from wilderness: The social dimension of fire management

    Treesearch

    Anne E. Black

    2009-01-01

    In 2008, the U.S. Forest Service (USFS) began piloting a "new" concept in fire management: managing "fire as fire" on the landscape; no more black-and-white distinctions between "good" fire and "bad" fire. Instead, under the new direction, the USFS manages the fire based on what the land, the long-term objectives, the land...

  17. 78 FR 34016 - Wireline Competition Bureau Seeks Comment on Options To Promote Rural Broadband in Rate-Of-Return...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... document is available for inspection and copying during normal business hours in the FCC Reference... carriers supports such networks, and indeed, under the USF/ICC Transformation Order, 76 FR 73830, November... originally sought comment on this proposal in the USF/ICC Transformation Order FNPRM, 76 FR 73830, November...

  18. Geropsychology Post-Doctoral Training in Public Sector Service Delivery: The USF/Tampa VA Fellowship Model

    ERIC Educational Resources Information Center

    Molinari, Victor; Chiriboga, David A.; Schonfeld, Lawrence; Haley, William E.; Schinka, John A.; Hyer, Kathy; Dupree, Larry W.

    2005-01-01

    There is a growing need for geropsychologists who are specialists in practice, research, education, and advocacy for older adults. The combined USF/Tampa VA geropsychology fellowship program focuses on the training of three post-doctoral Fellows each year in public sector service delivery across diverse long term care (LTC) and primary care…

  19. Urban forest health monitoring: large-scale assessments in the United States

    Treesearch

    Anne Buckelew Cumming; Daniel B. Twardus; David J. Nowak

    2008-01-01

    The U.S. Department of Agriculture, Forest Service (USFS), together with state partners, developed methods to monitor urban forest structure, function, and health at a large statewide scale. Pilot studies have been established in five states using protocols based on USFS Forest Inventory and Analysis and Forest Health Monitoring program data collection standards....

  20. Evaluation of open source data mining software packages

    Treesearch

    Bonnie Ruefenacht; Greg Liknes; Andrew J. Lister; Haans Fisk; Dan Wendt

    2009-01-01

    Since 2001, the USDA Forest Service (USFS) has used classification and regression-tree technology to map USFS Forest Inventory and Analysis (FIA) biomass, forest type, forest type groups, and National Forest vegetation. This prior work used Cubist/See5 software for the analyses. The objective of this project, sponsored by the Remote Sensing Steering Committee (RSSC),...

  1. Land cover change map comparisons using open source web mapping technologies

    Treesearch

    Erik Lindblom; Ian Housman; Tony Guay; Mark Finco; Kevin Megown

    2015-01-01

    The USDA Forest Service is evaluating the status of current landscape change maps and assessing gaps in their information content. These activities have been occurring under the auspices of the Landscape Change Monitoring System (LCMS) project, which is a joint effort between USFS Research, USFS Remote Sensing Applications Center (RSAC), USGS Earth Resources...

  2. What are the best seed sources for ecosystem restoration on BLM and USFS lands?

    Treesearch

    Larry Stritch; Peggy Olwell; Scott Lambert; Matthew E. Horning; Richard Cronn

    2010-01-01

    Native plant restoration policy calls for use of "genetically appropriate" native plant material on USDI Bureau of Land Management (BLM) and USDA Forest Service (USFS) lands. In this article, we summarize experimental evidence showing that local adaptation is widespread in all kingdoms of life, and how this "home-field advantage" has been exploited...

  3. "It was a young man's life": G. A. Pearson

    Treesearch

    Susan D. Olberding

    2008-01-01

    The nation's initial USFS research site commenced in a rustic cabin in the midst of northern Arizona's expansive ponderosa pine forest. Gustaf A. Pearson was the first in a distinguished line of USFS scientists to live and study there. A visitor to Fort Valley today often wishes he could have stood in Pearson's large boots (he was said to have enormous...

  4. The North Cascadia Adaptation Partnership: a science-management collaboration for responding to climate change

    Treesearch

    Crystal L. Raymond; David L. Peterson; Regina M. Rochefort

    2013-01-01

    The U.S. Forest Service (USFS) and National Park Service (NPS) have highlighted climate change as an agency priority and issued direction to administrative units for responding to climate change. In response, the USFS and NPS initiated the North Cascadia Adaptation Partnership (NCAP) in 2010. The goals of the NCAP were to build an inclusive partnership, increase...

  5. Riparian area protection and outdoor recreation: lessons from the Northwest Forest Plan

    Treesearch

    Patrick Impero Wilson; Troy E. Hall; Linda E. Kruger

    2012-01-01

    The Northwest Forest Plan required the US Forest Service (USFS) to shift its management focus to ecological values rather than the utilitarian ones that had dominated forest policy in the region. This article examines the effects of this shift on the USFS's historic mission to provide recreational access to the region's forests. Focusing on six national...

  6. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 1 of 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deepmore » hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This EIS reflects the public review of and comments offered on the draft statement. Included are descriptions of the characteristics of nuclear waste, the alternative disposal methods under consideration, and potential environmental impacts and costs of implementing these methods. Because of the programmatic nature of this document and the preliminary nature of certain design elements assumed in assessing the environmental consequences of the various alternatives, this study has been based on generic, rather than specific, systems. At such time as specific facilities are identified for particular sites, statements addressing site-specific aspects will be prepared for public review and comment.« less

  7. Conterminous U.S. and Alaska Forest Type Mapping Using Forest Inventory and Analysis Data

    Treesearch

    B. Ruefenacht; M.V. Finco; M.D. Nelson; R. Czaplewski; E.H. Helmer; J. A. Blackard; G.R. Holden; A.J. Lister; D. Salajanu; D. Weyermann; K. Winterberger

    2008-01-01

    Classification-trees were used to model forest type groups and forest types for the conterminous United States and Alaska. The predictor data were a geospatial data set with a spatial resolution of 250 m developed by the U.S. Department of Agriculture Forest Service (USFS). The response data were plot data from the USFS Forest Inventory and Analysis program. Overall...

  8. 75 FR 30757 - Endangered and Threatened Wildlife and Plants; 12-Month Finding on a Petition to Delist Cirsium...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    .... 8-9). The extent of C. vinaceum habitat on private property inholdings (privately owned land within... identified, of which 58 were on USFS land (Service 1993, p. 2). In 1995, there were 77 sites known to occur... species in 1987, surveys of USFS land estimated Cirsium vinaceum to be a species with 10,000 to 15,000...

  9. Management perceptions of off-highway vehicle use on national forest system lands in Appalachia

    Treesearch

    Katherine A. Thompson; Chad D. Pierskalla; Michael A. Schuett

    2008-01-01

    In 2005, the U.S. Forest Service (USFS) issued new standards for dealing with unmanaged recreation. All National Forest System units are to develop travel management plans by 2009. The purpose of this study was to determine differences in perceptions between USFS managers of national forests in Appalachia with low and high levels of offhighway vehicle (OHV) use...

  10. Forest Service Groundwater Plan Oversteps Bounds, Critics Say

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-09-01

    The U.S. Forest Service (USFS) is at odds with some members of Congress and other critics about a proposed government directive on groundwater resource management. The USFS says the proposed directive is an innocuous internal measure to provide a consistent, systematic, and transparent agency-wide approach to groundwater management. However, some participants in a 10 September congressional hearing questioned the directive, saying that the agency is overstepping its bounds.

  11. "It was a young man's life": G.A. Pearson (P-53)

    Treesearch

    Susan D. Olberding

    2008-01-01

    The nation's initial USFS research site commenced in a rustic cabin in the midst of northern Arizona’s expansive ponderosa pine forest. Gustaf A. Pearson was the first in a distinguished line of USFS scientists to live and study there. A visitor to Fort Valley today often wishes he could have stood in Pearson's large boots (he was said to have enormous feet)...

  12. Northern Region Landbird Monitoring Program: A USFS-University of Montana Partnership Designed to Provide Both Short-term and Long-term Feedback for Land Managers

    Treesearch

    R. Hutto; Skip Kowalski

    2006-01-01

    The Northern Region Landbird Monitoring Program (NRLMP) began in 1990 as a cooperative effort between the United States Forest Service (USFS) and the University of Montana. The combination of a research-oriented perspective from the University and a management-needs perspective from the National Forests within the Northern Region led to the realization that landbirds...

  13. The rs2516839 Polymorphism of the USF1 Gene May Modulate Serum Triglyceride Levels in Response to Cigarette Smoking

    PubMed Central

    Niemiec, Pawel; Nowak, Tomasz; Iwanicki, Tomasz; Gorczynska-Kosiorz, Sylwia; Balcerzyk, Anna; Krauze, Jolanta; Grzeszczak, Wladyslaw; Wiecha, Maria; Zak, Iwona

    2015-01-01

    Single nucleotide polymorphisms (SNPs) of the USF1 gene (upstream stimulatory factor 1) influence plasma lipid levels. This study aims to determine whether USF1 SNPs interact with traditional risk factors of atherosclerosis to increase coronary artery disease (CAD) risk. In the present study serum lipid levels and USF1 gene polymorphisms (rs2516839 and rs3737787) were determined in 470 subjects: 235 patients with premature CAD and 235 controls. A trend of increasing triglycerides (TG) levels in relation to the C allele dose of rs2516839 SNP was observed. The synergistic effect of cigarette smoking and C allele carrier state on CAD risk was also found (SIM = 2.69, p = 0.015). TG levels differentiated significantly particular genotypes in smokers (1.53 mmol/L for TT, 1.80 mmol/L for CT and 2.27 mmol/L for CC subjects). In contrast, these differences were not observed in the non-smokers subgroup (1.57 mmol/L for TT, 1.46 mmol/L for CT and 1.49 mmol/L for CC subjects). In conclusion, the rs2516839 polymorphism may modulate serum triglyceride levels in response to cigarette smoking. Carriers of the C allele seem to be particularly at risk of CAD, when exposed to cigarette smoking. PMID:26068452

  14. Ethanol and dietary unsaturated fat (corn oil/linoleic acid enriched) cause intestinal inflammation and impaired intestinal barrier defense in mice chronically fed alcohol.

    PubMed

    Kirpich, Irina A; Feng, Wenke; Wang, Yuhua; Liu, Yanlong; Beier, Juliane I; Arteel, Gavin E; Falkner, K Cameron; Barve, Shirish S; McClain, Craig J

    2013-05-01

    Alcohol and dietary fat both play an important role in alcohol-mediated multi-organ pathology, including gut and liver. In the present study we hypothesized that the combination of alcohol and dietary unsaturated fat (USF) would result in intestinal inflammatory stress and mucus layer alterations, thus contributing to disruption of intestinal barrier integrity. C57BL/6N mice were fed Lieber-DeCarli liquid diets containing EtOH and enriched in USF (corn oil/linoleic acid) or SF (medium chain triglycerides: beef tallow) for 8 weeks. Intestinal histology, morphometry, markers of inflammation, as well as levels of mucus protective factors were evaluated. Alcohol and dietary USF triggered an intestinal pro-inflammatory response, characterized by increase in Tnf-α, MCP1, and MPO activity. Further, alcohol and dietary USF, but not SF, resulted in alterations of the intestinal mucus layer, characterized by decreased expression of Muc2 in the ileum. A strong correlation was observed between down-regulation of the antimicrobial factor Cramp and increased Tnf-α mRNA. Therefore, dietary unsaturated fat (corn oil/LA enriched) is a significant contributing factor to EtOH-mediated intestinal inflammatory response and mucus layer alterations in rodents. Copyright © 2013 Elsevier Inc. All rights reserved.

  15. Learning to Live with Off-Highway Vehicles: Lessons Learned from the Dixie National Forest

    Treesearch

    Aaron K. Divine; Pamela E. Foti

    2004-01-01

    Nationwide, there are an estimated 446,000 miles of road on United States Forest Service (USFS) lands—four times that of any other public land management agency (USDA 2000; Havlick 2002). Most USFS roads were developed as part of a network to access timber on some 192 million acres of forested land during the past century (Forman et al. 2003). In recent years,...

  16. The transcription factor DREAM represses A20 and mediates inflammation

    PubMed Central

    Tiruppathi, Chinnaswamy; Soni, Dheeraj; Wang, Dong-Mei; Xue, Jiaping; Singh, Vandana; Thippegowda, Prabhakar B.; Cheppudira, Bopaiah P.; Mishra, Rakesh K.; DebRoy, Auditi; Qian, Zhijian; Bachmaier, Kurt; Zhao, Youyang; Christman, John W.; Vogel, Stephen M.; Ma, Averil; Malik, Asrar B.

    2014-01-01

    Here we show that the transcription-repressor DREAM binds to the A20 promoter to repress the expression of A20, the deubiquitinase suppressing inflammatory NF-κB signaling. DREAM-deficient (Dream−/−) mice displayed persistent and unchecked A20 expression in response to endotoxin. DREAM functioned by transcriptionally repressing A20 through binding to downstream regulatory elements (DREs). In contrast, USF1 binding to the DRE-associated E-box domain activated A20 expression in response to inflammatory stimuli. These studies define the critical opposing functions of DREAM and USF1 in inhibiting and inducing A20 expression, respectively, and thereby the strength of NF-κB signaling. Targeting of DREAM to induce USF1-mediated A20 expression is therefore a potential anti-inflammatory strategy in diseases such as acute lung injury associated with unconstrained NF-κB activity. PMID:24487321

  17. Southern California Disasters II

    NASA Technical Reports Server (NTRS)

    Nicholson, Heather; Todoroff, Amber L.; LeBoeuf, Madeline A.

    2015-01-01

    The USDA Forest Service (USFS) has multiple programs in place which primarily utilize Landsat imagery to produce burn severity indices for aiding wildfire damage assessment and mitigation. These indices provide widely-used wildfire damage assessment tools to decision makers. When the Hyperspectral Infrared Imager (HyspIRI) is launched in 2022, the sensor's hyperspectral resolution will support new methods for assessing natural disaster impacts on ecosystems, including wildfire damage to forests. This project used simulated HyspIRI data to study three southern California fires: Aspen, French, and King. Burn severity indices were calculated from the data and the results were quantitatively compared to the comparable USFS products currently in use. The final results from this project illustrate how HyspIRI data may be used in the future to enhance assessment of fire-damaged areas and provide additional monitoring tools for decision support to the USFS and other land management agencies.

  18. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less

  19. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less

  20. Regional Model Studies Nested in HYCOM. Application to the West Florida Shelf and the Cariaco Basin using ROMS

    DTIC Science & Technology

    2007-09-30

    marine.usf.edu Aida Alvera -Azcárate Phone: (727) 553-3508 Fax: (727) 553 1189 email: aalvera@marine.usf.edu Alexander Barth, Phone: (727...WFS and the data assimilation are being performed by Alexander Barth. The Cariaco nesting is performed by Aida Alvera -Azcárate. WORK COMPLETED...363–380. Barth, A., Beckers, J.-M., Alvera -Azcárate, A. and Weisberg, R.H. (2007), Filtering inertia-gravity waves from the initial conditions of

  1. Flotation Analysis for Boat Docks on U.S. Army Corps of Engineers Projects. Recreation Management Support Program

    DTIC Science & Technology

    2009-06-01

    USACE 2008c)) on June 3, 1992 that “effectively precludes the future use of expanded polystyrene unless it is encased in an approved protective coating...punctured. Closed cell (extruded) expanded polystyrene of good quality and manufac- tured for marine use will be required. Lesser quality foam bead flota...Forest Service (USFS) (USFS 2008) – “Open cell Expanded Polystyrene Foam (EPS) has an open structure that easily lets water into its interior. It

  2. Statistical studies of animal response data from USF toxicity screening test method

    NASA Technical Reports Server (NTRS)

    Hilado, C. J.; Machado, A. M.

    1978-01-01

    Statistical examination of animal response data obtained using Procedure B of the USF toxicity screening test method indicates that the data deviate only slightly from a normal or Gaussian distribution. This slight departure from normality is not expected to invalidate conclusions based on theoretical statistics. Comparison of times to staggering, convulsions, collapse, and death as endpoints shows that time to death appears to be the most reliable endpoint because it offers the lowest probability of missed observations and premature judgements.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the publicmore » involvement process is the Comment Report which follows in part of this volume on Public Involvement.« less

  4. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line optionsmore » would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.« less

  5. University of South Florida- Phase Change Materials (PCM)

    ScienceCinema

    Goswami, Yogi; Stefanakos, Lee

    2018-05-30

    USF is developing low-cost, high-temperature phase-change materials (PCMs) for use in thermal energy storage systems. Heat storage materials are critical to the energy storage process. In solar thermal storage systems, heat can be stored in these materials during the day and released at night--when the sun is not out--to drive a turbine and produce electricity. In nuclear storage systems, heat can be stored in these materials at night and released to produce electricity during daytime peak-demand hours. Most PCMs do not conduct heat very well. Using an innovative, electroless encapsulation technique, USF is enhancing the heat transfer capability of its PCMs. The inner walls of the capsules will be lined with a corrosion-resistant, high-infrared emissivity coating, and the absorptivity of the PCM will be controlled with the addition of nano-sized particles. USF's PCMs remain stable at temperatures from 600 to 1,000°C and can be used for solar thermal power storage, nuclear thermal power storage, and other applications.

  6. Deep patch technique for landslide repair. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Helwany, B.M.

    1994-10-01

    The report describes the laboratory testing of the `USFS deep patch` technique and a CTI modification of this technique for repairing landslides with geosynthetic reinforcement. The technique involves replacing sections of roadway lost due to landslides on top of a geosynthetically-reinforced embankment. The CTI modification involves replacing the reinforced slope with a geosynthetically-reinforced retaining wall with a truncated base. Both techniques rely on the cantilevering ability of the reinforced mass to limit the load on the foundation with a high slide potential. The tests with road base showed that (1) both the USFS and CTI repair reduced effectively the adversemore » effects of local landsliding on the highway pavement by preventing crack propagation; (2) the USFS repair increased the stability of the repaired slope, which was in progressive failure, by reducing the stresses exerted on it; and (3) the CTI repair produced substantially greater stresses on its foundation due to the truncated base of the reinforced mass.« less

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dahabieh, Matthew S., E-mail: dahabieh@interchange.ubc.ca; Ooms, Marcel, E-mail: marcel.ooms@mssm.edu; Malcolm, Tom, E-mail: tmalc1@yahoo.com

    Transcription from the HIV-1 long terminal repeat (LTR) is mediated by numerous host transcription factors. In this study we characterized an E-box motif (RBE1) within the core promoter that was previously implicated in both transcriptional activation and repression. We show that RBE1 is a binding site for the RBF-2 transcription factor complex (USF1, USF2, and TFII-I), previously shown to bind an upstream viral element, RBE3. The RBE1 and RBE3 elements formed complexes of identical mobility and protein constituents in gel shift assays, both with Jurkat T-cell nuclear extracts and recombinant USF/TFII-I. Furthermore, both elements are regulators of HIV-1 expression; mutationsmore » in LTR-luciferase reporters and in HIV-1 molecular clones resulted in decreased transcription, virion production, and proviral expression in infected cells. Collectively, our data indicate that RBE1 is a bona fide RBF-2 binding site and that the RBE1 and RBE3 elements are necessary for mediating proper transcription from the HIV-1 LTR.« less

  8. Advancing Fire Weather Research via Interagency Collaboration: The NOAA/USFS MOU

    NASA Astrophysics Data System (ADS)

    Schranz, S.; Pouyat, R.

    2012-12-01

    In 2005, the Western Governors' Association (WGA) first articulated the need for closer collaboration between NOAA and the land management agencies to improve our services - and to ensure the best new technology and scientific advances are infused into fire weather information and services. NOAA has taken the WGA advice very seriously and, over the past few years, have followed up by polling users of our fire weather information. This was done both by our Office of the Federal Coordinator for Meteorology, and via an examination of internal and collaborative research activities as conducted by NOAA's Science Advisory Board. Through these processes, and given the tight budget environment, it's become clear we can't make needed progress alone. We need to call upon our joint expertise, along with the expertise of partners across the federal, state, academic, and research communities. This talk will outline the NOAA/USFS MOU signed in August, 2012 and the collaborative research already begun with the USFS and other partners.

  9. Association of USF1 and APOA5 polymorphisms with familial combined hyperlipidemia in an Italian population.

    PubMed

    Di Taranto, Maria Donata; Staiano, Antonino; D'Agostino, Maria Nicoletta; D'Angelo, Antonietta; Bloise, Elena; Morgante, Alberto; Marotta, Gennaro; Gentile, Marco; Rubba, Paolo; Fortunato, Giuliana

    2015-02-01

    Familial combined hyperlipidemia (FCH) is a polygenic and multifactorial disease characterized by a variable phenotype showing increased levels of triglycerides and/or cholesterol. The aim of this study was to identify single nucleotides (SNPs) in lipid-related genes associated with FCH. Twenty SNPs in lipid-related genes were studied in 142 control subjects and 165 FCH patients after excluding patients with mutations in the LDLR gene and patients with the E2/E2 genotype of APOE. In particular, we studied the 9996G > A (rs2073658) and 11235C > T (rs3737787) variants in the Upstream Stimulatory Factor 1 gene (USF1), and the -1131T > C (rs662799) and S19W (rs3135506) variants in the Apolipoprotein A-V gene (APOA5). We found that the frequencies of these variants differed between patients and controls and that are associated with different lipid profiles. At multivariate logistic regression SNP S19W in APOA5 remained significantly associated with FCH independently of age, sex, BMI, cholesterol and triglycerides. Our results show that the USF1 and APOA5 polymorphisms are associated with FCH and that the S19W SNP in the APOA5 gene is associated to the disease independently of total cholesterol, triglycerides and BMI. However, more extensive studies including other SNPs such as rs2516839 in USF1, are required. Copyright © 2014 Elsevier Ltd. All rights reserved.

  10. High-Resolution Ultrasound-Switchable Fluorescence Imaging in Centimeter-Deep Tissue Phantoms with High Signal-To-Noise Ratio and High Sensitivity via Novel Contrast Agents

    PubMed Central

    Cheng, Bingbing; Bandi, Venugopal; Wei, Ming-Yuan; Pei, Yanbo; D’Souza, Francis; Nguyen, Kytai T.; Hong, Yi; Yuan, Baohong

    2016-01-01

    For many years, investigators have sought after high-resolution fluorescence imaging in centimeter-deep tissue because many interesting in vivo phenomena—such as the presence of immune system cells, tumor angiogenesis, and metastasis—may be located deep in tissue. Previously, we developed a new imaging technique to achieve high spatial resolution in sub-centimeter deep tissue phantoms named continuous-wave ultrasound-switchable fluorescence (CW-USF). The principle is to use a focused ultrasound wave to externally and locally switch on and off the fluorophore emission from a small volume (close to ultrasound focal volume). By making improvements in three aspects of this technique: excellent near-infrared USF contrast agents, a sensitive frequency-domain USF imaging system, and an effective signal processing algorithm, for the first time this study has achieved high spatial resolution (~ 900 μm) in 3-centimeter-deep tissue phantoms with high signal-to-noise ratio (SNR) and high sensitivity (3.4 picomoles of fluorophore in a volume of 68 nanoliters can be detected). We have achieved these results in both tissue-mimic phantoms and porcine muscle tissues. We have also demonstrated multi-color USF to image and distinguish two fluorophores with different wavelengths, which might be very useful for simultaneously imaging of multiple targets and observing their interactions in the future. This work has opened the door for future studies of high-resolution centimeter-deep tissue fluorescence imaging. PMID:27829050

  11. High-Resolution Ultrasound-Switchable Fluorescence Imaging in Centimeter-Deep Tissue Phantoms with High Signal-To-Noise Ratio and High Sensitivity via Novel Contrast Agents.

    PubMed

    Cheng, Bingbing; Bandi, Venugopal; Wei, Ming-Yuan; Pei, Yanbo; D'Souza, Francis; Nguyen, Kytai T; Hong, Yi; Yuan, Baohong

    2016-01-01

    For many years, investigators have sought after high-resolution fluorescence imaging in centimeter-deep tissue because many interesting in vivo phenomena-such as the presence of immune system cells, tumor angiogenesis, and metastasis-may be located deep in tissue. Previously, we developed a new imaging technique to achieve high spatial resolution in sub-centimeter deep tissue phantoms named continuous-wave ultrasound-switchable fluorescence (CW-USF). The principle is to use a focused ultrasound wave to externally and locally switch on and off the fluorophore emission from a small volume (close to ultrasound focal volume). By making improvements in three aspects of this technique: excellent near-infrared USF contrast agents, a sensitive frequency-domain USF imaging system, and an effective signal processing algorithm, for the first time this study has achieved high spatial resolution (~ 900 μm) in 3-centimeter-deep tissue phantoms with high signal-to-noise ratio (SNR) and high sensitivity (3.4 picomoles of fluorophore in a volume of 68 nanoliters can be detected). We have achieved these results in both tissue-mimic phantoms and porcine muscle tissues. We have also demonstrated multi-color USF to image and distinguish two fluorophores with different wavelengths, which might be very useful for simultaneously imaging of multiple targets and observing their interactions in the future. This work has opened the door for future studies of high-resolution centimeter-deep tissue fluorescence imaging.

  12. USGS Field Activities 11CEV01 and 11CEV02 on the West Florida Shelf, Gulf of Mexico, in January and February 2011

    USGS Publications Warehouse

    Robbins, Lisa L.; Knorr, Paul O.; Daly, Kendra L.; Taylor, Carl A.

    2014-01-01

    During January and February 2011 the U.S. Geological Survey (USGS), in cooperation with the University of South Florida (USF), conducted geochemical surveys on the west Florida Shelf. Data collected will allow USGS and USF scientists to investigate the effects of climate change on ocean acidification within the northern Gulf of Mexico, specifically, the effect of ocean acidification on marine organisms and habitats. This work is part of a larger USGS study on Climate and Environmental Variability (CEV). The first cruise was conducted from January 3 – 7 (11CEV01) and the second from February 17 - 27 (11CEV02). To view each cruise's survey lines, please see the Trackline page. Both cruises took place aboard the R/V Weatherbird II, a ship of opportunity led by Dr. Kendra Daly (USF), which departed and returned from Saint Petersburg, Florida. Data collection included sampling of the surface and water column (referred to as station samples) with lab analysis of pH, dissolved inorganic carbon (DIC), and total alkalinity. Augmenting the lab analysis was a continuous flow-through system with a Conductivity-Temperature-Depth (CTD) sensor, which also recorded salinity, and pH. Corroborating the USGS data are the vertical CTD profiles collected by USF. The CTD casts measured continuous vertical profiles of oxygen, chlorophyll fluorescence, optical backscatter, and transmissometer. Discrete samples for nutrients, chlorophyll, and particulate organic carbon/nitrogen were also collected during the CTD casts.

  13. What is the best cryopreservation protocol for human testicular tissue banking?

    PubMed

    Baert, Y; Van Saen, D; Haentjens, P; In't Veld, P; Tournaye, H; Goossens, E

    2013-07-01

    Is there a better alternative to the conventional cryopreservation protocols for human testicular tissue banking? Uncontrolled slow freezing (USF) using 1.5 M dimethylsulphoxide (DMSO) and 0.15 M sucrose as cryoprotectants appears to be a user-friendly and efficient method for the cryopreservation of human testicular tissue. Currently, time-consuming controlled slow freezing (CSF) protocols that need expensive equipment are commonly used for human testicular tissue banking. USF and vitrification are cryopreservation techniques that were successfully applied in several animal models but need further exploration with human tissue. Fragments (n = 160) of testicular tissue from 14 patients undergoing vasectomy reversal were assigned to a fresh control group or one of the following cryopreservation procedures: CSF using DMSO at a concentration of 0.7 or 1.5 M in the presence (+S) or absence of sucrose (-S), USF using either 0.7 or 1.5 M DMSO combined with sucrose, solid-surface vitrification (SSV) or direct cover vitrification (DCV). Light microscopic evaluations were performed to study apoptosis, germ cell proliferation ability, spermatogonial survival, coherence of the seminiferous epithelium and integrity of the interstitial compartment after cryopreservation. Ultrastructural alterations were studied by scoring cryodamage to four relevant testicular cell types. The USF 1.5 M DMSO + S protocol proved not solely to prevent cell death and to preserve seminiferous epithelial coherence, interstitial compartment integrity, SG and their potential to divide but also protected the testicular cell ultrastructure. A significant reduction in the number of SG per tubule from 21.4 ± 5.6 in control tissue to 4.9 ± 2.1, 8.2 ± 5.4, 11.6 ± 5.1, 8.8 ± 3.9, 12.6 ± 4.4 and 11.7 ± 5.7 was observed after cryopreservation combined with at least one other form of cryoinjury when using CSF 0.7 M DMSO -S, CSF 0.7 M DMSO + S, CSF 1.5 M DMSO + S, USF 0.7 M DMSO + S, SSV and direct cover vitrification (DCV), respectively (P < 0.001). Supplementary research is required to investigate the effect on tissue functionality and to confirm this study's findings using prepubertal tissue. An optimal cryopreservation protocol enhances the chances for successful fertility restoration. USF, being an easy and cost-effective alternative to CSF, would be preferable for laboratories in developing countries or whenever tissue is to be procured from a diseased child at a site distant from the banking facility.

  14. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of addingmore » thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.« less

  15. USF-related transcription factor, HIV-TF1, stimulates transcription of human immunodeficiency virus-1.

    PubMed

    Maekawa, T; Sudo, T; Kurimoto, M; Ishii, S

    1991-09-11

    The transcription factor HIV-TF1, which binds to a region about 60 bp upstream from the enhancer of the human immunodeficiency virus-1 (HIV-1), was purified from human B cells. HIV-TF1 had a molecular weight of 39,000. Binding of HIV-TF1 to the HIV long terminal repeat (LTR) activated transcription from the HIV promoter in vitro. The HIV-TF1-binding site in HIV LTR was similar to the site recognized by upstream stimulatory factor (USF) in the adenovirus major late promoter. DNA-binding properties of HIV-TF1 suggested that HIV-TF1 might be identical or related to USF. Interestingly, treatment of purified HIV-TF1 by phosphatase greatly reduced its DNA-binding activity, suggesting that phosphorylation of HIV-TF1 was essential for DNA binding. The disruption of HIV-TF1-binding site induced a 60% decrease in the level of transcription from the HIV promoter in vivo. These results suggest that HIV-TF1 is involved in transcriptional regulation of HIV-1.

  16. Forecast on the application of Japanese universal service fund to remote diagnosis for frozen section.

    PubMed

    Nakajima, Isao

    2010-12-01

    Due to the socioeconomic reason in Japan, some cancer patient is sometimes operated at a rural hospital where only several surgeons perform and no pathologist checks its malignancy. Therefore, the system of the remote diagnosis for frozen section has been standing up in this country for 7 years. In Japan, the USF has started from February 2007 to support only telecommunications operator's hardware (NTT's equipment such as digital switch board) in high cost areas, not for the reimbursement of the tariff of the public users, such as telepathology. To solve such social cormorant equality, when the USF and PAs were supported in the present quick frozen intraoperative telepathology diagnosis, the quality of the cancer treatment in rural area will be improved. Based on the past data of the Japanese telepathology with beta distribution function, it can be estimated that user terminals becomes five times more than present users with support of USF and PAs. Moreover, using VPN on the B'FLETS, the effect of other teleconsultations will spread to the nationwide.

  17. The sensitivity of relative toxicity rankings by the USF/NASA test method to some test variables

    NASA Technical Reports Server (NTRS)

    Hilado, C. J.; Labossiere, L. A.; Leon, H. A.; Kourtides, D. A.; Parker, J. A.; Hsu, M.-T. S.

    1976-01-01

    Pyrolysis temperature and the distance between the source and sensor of effluents are two important variables in tests for relative toxicity. Modifications of the USF/NASA toxicity screening test method to increase the upper temperature limit of pyrolysis, reduce the distance between the sample and the test animals, and increase the chamber volume available for animal occupancy, did not significantly alter rankings of relative toxicity of four representative materials. The changes rendered some differences no longer significant, but did not reverse any rankings. The materials studied were cotton, wool, aromatic polyamide, and polybenzimidazole.

  18. 78 FR 56921 - South Bay Salt Pond Restoration Project, Phase 2 (Ponds R3, R4, R5, S5, A1, A2W, A8, A8S, A19...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ...We, the U.S. Fish and Wildlife Service (USFWS), in coordination with the California State Coastal Conservancy, are preparing a joint environmental impact statement/environmental impact report (EIS/EIR) for the proposed restoration of ponds R3, R4, R5, S5, A1, A2W, A8, A8S, A19, A20, and A21 at the Don Edwards National Wildlife Refuge (Refuge) in Alameda, Santa Clara and San Mateo Counties, California. The proposed project is Phase 2 of the South Bay Salt Pond Restoration Project and consists of restoring and enhancing over 2,000 acres of tidal wetlands and managed pond habitats in the South San Francisco Bay. It would also include storage and use of upland fill and dredged material in one or more of the seasonal ponds in the Refuge or on the levees that surround them. Phase 2 may also include collaborative restoration and/or flood management activities with non- USFWS landowners or managers of public infrastructure on adjacent properties. This notice advises the public that we intend to gather information necessary to prepare an EIS pursuant to the National Environmental Policy Act (NEPA). We encourage the public and other agencies to participate in the NEPA scoping process by attending the public scoping meeting and/or by sending written suggestions and information on the issues and concerns that should be addressed in the draft EIS/EIR, including the range of alternatives, appropriate mitigation measures, and the nature and extent of potential environmental impacts.

  19. Development of "Remotely Operated Vehicles for Education and Research" (ROVERs)

    NASA Astrophysics Data System (ADS)

    Gaines, J. E.; Bland, G.; Bydlowski, D.

    2017-12-01

    The University of South Florida is a team member for the AREN project which develops educational technologies for data acquisition. "Remotely Operated Vehicles for Education and Research" (ROVERs) are floatable data acquisition systems used for Earth science measurements. The USF partnership was productive in the first year, resulting in new autonomous ROVER platforms being developed and used during a 5 week STEM summer camp by middle school youth. ROVERs were outfitted with GPS and temperature sensors and programmed to move forward, backwards, and to turn autonomously using the National Instruments myRIO embedded system. GLOBE protocols were used to collect data. The outreach program's structure lended itself to accomplishing an essential development effort for the AREN project towards the use of the ROVER platform in informal educational settings. A primary objective of the partnership is curriculum development to integrate GLOBE protocols and NASA technology and hardware/ROVER development wher new ROVER platforms are explored. The USF partnership resulted in two design prototypes for ROVERs, both of which can be created from recyclable materials for flotation and either 3D printed or laser cut components. In addition, both use the National Instruments myRIO for autonomous control. We will present two prototypes designed for use during the USF outreach program, the structure of the program, and details on the fabrication of prototype Z during the program by middle school students. Considering the 5-year objective of the AREN project is to "develop approaches, learning plans, and specific tools that can be affordably implemented nationwide (globally)", the USF partnership is key as it contributes to each part of the objective in a unique and impactful way.

  20. Copper-silver deposits of the Revett Formation, Montana and Idaho: origin and resource potential

    USGS Publications Warehouse

    Frost, Thomas P.; Zientek, Michael L.

    2006-01-01

    The Revett Formation of northern Idaho and western Montana contains major stratabound copper-silver deposits near Troy, Rock Creek, and Rock Lake, Montana. To help the U.S. Forest Service (USFS) meet its goal of integrating geoscience information into the land-planning process, U.S. Geological Survey (USGS) scientists recently completed a compilation of regional stratigraphy and mineralogy of the Revett Formation and a mineral resource assessment of Revett-type copper-silver deposits. The USGS assessment indicates that a large area of USFS-administered land in northwestern Montana and northern Idaho may contain significant undiscovered Revett-type copper-silver deposits.

  1. Energy Efficiency, Water Efficiency, and Renewable Energy Site Assessment: San Juan National Forest - Dolores Ranger District, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kandt, Alicen J.; Kiatreungwattana, Kosol

    This report summarizes the results from an energy efficiency, water efficiency, and renewable energy site assessment of the Dolores Ranger District in the San Juan National Forest in Colorado. A team led by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) conducted the assessment with United States Forest Service (USFS) personnel on August 16-17, 2016, as part of ongoing efforts by USFS to reduce energy and water use and implement renewable energy technologies. The assessment is approximately an American Society of Heating, Refrigerating, and Air-Conditioning Engineers Level 2 audit and meets Energy Independence and Security Act requirements.

  2. Draft environmental impact statement for the Galileo Mission (Tier 2)

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of: (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG).

  3. Breaking the acoustic diffraction limit via nonlinear effect and thermal confinement for potential deep-tissue high-resolution imaging

    PubMed Central

    Yuan, Baohong; Pei, Yanbo; Kandukuri, Jayanth

    2013-01-01

    Our recently developed ultrasound-switchable fluorescence (USF) imaging technique showed that it was feasible to conduct high-resolution fluorescence imaging in a centimeter-deep turbid medium. Because the spatial resolution of this technique highly depends on the ultrasound-induced temperature focal size (UTFS), minimization of UTFS becomes important for further improving the spatial resolution USF technique. In this study, we found that UTFS can be significantly reduced below the diffraction-limited acoustic intensity focal size via nonlinear acoustic effects and thermal confinement by appropriately controlling ultrasound power and exposure time, which can be potentially used for deep-tissue high-resolution imaging. PMID:23479498

  4. CDC2 Mediates Progestin Initiated Endometrial Stromal Cell Proliferation: A PR Signaling to Gene Expression Independently of Its Binding to Chromatin

    PubMed Central

    Vallejo, Griselda; Mestre-Citrinovitz, Ana C.; Ballaré, Cecilia; Beato, Miguel; Saragüeta, Patricia

    2014-01-01

    Although non-genomic steroid receptor pathways have been studied over the past decade, little is known about the direct gene expression changes that take place as a consequence of their activation. Progesterone controls proliferation of rat endometrial stromal cells during the peri-implantation phase of pregnancy. We showed that picomolar concentration of progestin R5020 mimics this control in UIII endometrial stromal cells via ERK1-2 and AKT activation mediated by interaction of Progesterone Receptor (PR) with Estrogen Receptor beta (ERb) and without transcriptional activity of endogenous PR and ER. Here we identify early downstream targets of cytoplasmic PR signaling and their possible role in endometrial stromal cell proliferation. Microarray analysis of global gene expression changes in UIII cells treated for 45 min with progestin identified 97 up- and 341 down-regulated genes. The most over-represented molecular functions were transcription factors and regulatory factors associated with cell proliferation and cell cycle, a large fraction of which were repressors down-regulated by hormone. Further analysis verified that progestins regulate Ccnd1, JunD, Usf1, Gfi1, Cyr61, and Cdkn1b through PR-mediated activation of ligand-free ER, ERK1-2 or AKT, in the absence of genomic PR binding. ChIP experiments show that progestin promoted the interaction of USF1 with the proximal promoter of the Cdc2 gene. Usf1 knockdown abolished Cdc2 progestin-dependent transcriptional regulation and cell proliferation, which also blocked Cdc2 knockdown. We conclude that progestin-induced proliferation of endometrial stromal cells is mediated by ERK1-2 and AKT dependent early regulation of USF1, which directly induces Cdc2. To our knowledge, this is the first description of early target genes of progestin-activated classical PR via crosstalk with protein kinases and independently of hormone receptor binding to the genomic targets. PMID:24859236

  5. Global Health

    MedlinePlus

    ... Global Health Security HIV & Tuberculosis Global Health Protection Malaria & Parasitic Diseases Immunization Other Diseases & Threats Travelers' Health ... Organization Strategy Partnerships Funding Latest News War on malaria: USF researchers wage battle against global disease 83 ...

  6. High-Volume Airborne Fluids Handling Technologies to Fight Wildfires

    NASA Technical Reports Server (NTRS)

    Dickerson, Mark; Cox, Timothy; Hale, Cliff; Hatton, Rick

    2010-01-01

    NASA recently partnered with the U.S. Forest Service (USFS) on a project to examine mission suitability and recommend policies and procedures for the use of very large aerial firefighting aircraft such as the Boeing 747 and DC-10 aerial retardant delivery aircraft. The aircraft under study included a 10Tanker DC-10 and an Evergreen B-747. NASA's Dryden Flight Research Center and Ames Research Center worked with the USFS to help determine the safe flight envelope for these Very Large Air Tanker (VLAT) aircraft for the USFS and the Department of the Interior (DOI). This new generation of supertankers includes aircraft like these that have as much as four times the delivery capacity of the previous generation of aerial firefighting aircraft. Dryden performed operational test and evaluation assessments and reported findings and recommendations on these aircraft in cooperation with Ames. The team developed, implemented, and directed an evaluation test plan for use in flight test and in simulation. Ames provided support using pilot-in-the-loop simulations and coordinated simulator models, flight profiles, and data analysis with Dryden. The test plan was designed to evaluate the suitability of VLAT aircraft as a function of mission environment. Based on this analysis, NASA generated interim flight envelope limitations to enhance safety and operational utility in the fire-retardant delivery mission. These recommended flight limitations were adopted by the USFS. The 10Tanker DC-10 has been in use for several years with the California Department of Forestry and Fire Protection(Cal-Fire), but until NASA took on the challenge of reviewing VLAT capabilities and limitations, the USFS was hesitant to add them to the federal wildfire arsenal. The DC-10 delivery system is based on an externally mounted set of tanks and a bomb-bay style set of clamshell doors that are opened in precisely calibrated ways to deliver the amounts and concentrations of retardant called for by the specific wildfire situation. The system was manufactured by Jordan Air of Central Point, OR, and was installed by Victorville Aerospace in Victorville, CA. It can deliver 12,000 gallons (45.4 kL) of retardant in as little as eight seconds. The aircraft can deliver a partial load of retardant and make multiple drops on the same flight, or the entire load can be rapidly delivered in one pass if required for maximum coverage. The Evergreen 747 uses internal tankage and a pressurized delivery system to enable volume and coverage levels that also meet USFS requirements, but enables computer control of flow for desired precision. This system was designed and built by Adaptive Aerospace of Tehachapi, CA and can deliver about 20,000 gallons (75.7 kL) of retardant in approximately ten seconds. The 747 can also make multiple independent drops, or deliver the entire load at once. NASA found that both of these VLAT aircraft are compatible with the wildfire suppression mission when used to supplement other aerial retardant delivery platforms. The major recommendations for deployment that resulted from this study relate to terrain clearance, the type of terrain in the drop area, availability of qualified lead planes to guide the VLAT approach to the drop area, and low-altitude maneuvering limitations. NASA s analysis suggests that with the appropriate flight procedures, these aircraft will provide a powerful set of tools to fight wildfires.

  7. Environmental Resources of Selected Areas of Hawaii: Ecological Resources (DRAFT)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trettin, C.C.; Tolbert, V.R.; Jones, A.T.

    1994-06-01

    This report has been prepared to make available and archive the background scientific data and related information collected on ecological resources during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The U.S. Department of Energy (COE) published a notice in the Federal Register on May 17, 1994 (Fed. Regist. 5925638) withdrawing its Notice of Intent (Fed. Regst. 575433) of February 14, 1992, to prepare the HGP-EIS. Since the state of Hawaii is no longer pursuingmore » or planning to pursue the HGP, DOE considers the project to be terminated. The background scientific data and related information presented in this report focus on several areas of Hawaii County, including the southeastern coast, a potential development corridor along the Saddle Road between Hilo and the North Kohala District on the northwestern coast, and on the southeastern coast of Maui. In this report, reference is made to these areas as study areas rather than as areas where proposed or alternative facilities of the HGP would be located. The resource areas addressed herein include terrestrial ecology, aquatic ecology, and marine ecology. The scientific background data and related information is being made available for future research in these areas. This report describes the environmental resources present in the areas studied (i.e., the affected environment) and does not represent an assessment of environmental impacts.« less

  8. Algorithm-development activities

    NASA Technical Reports Server (NTRS)

    Carder, Kendall L.

    1994-01-01

    The task of algorithm-development activities at USF continues. The algorithm for determining chlorophyll alpha concentration, (Chl alpha) and gelbstoff absorption coefficient for SeaWiFS and MODIS-N radiance data is our current priority.

  9. Gender-assortative waist circumference in mother-daughter and father-son pairs, and its implications. An 11-year longitudinal study in children (EarlyBird 59).

    PubMed

    Mostazir, M; Jeffery, A; Voss, L; Wilkin, T

    2014-06-01

    Body mass index (BMI) is reportedly gender assortative (mother-daughter, father-son) in contemporary children. We investigated the corresponding transmission of waist circumference (WC) and its implications. We measured parental WC at baseline and WC, height, weight and para-umbilical skin-fold (USF) annually in their offspring from 5 to 15 years (n = 223 trios). Parents were deemed normal metabolic risk (NR) or high risk (HR) according to World Health Organization (WHO) cut-points for WC (mothers 80 cm, fathers 94 cm). The residual from WC adjusted for BMI (WC|BMI ) was used as a surrogate for excess intra-abdominal fat, and its association with insulin resistance (HOMA2-IR) was sought. WC and USF were both gender assortative, while WC|BMI was not. WC was greater by 1.62 cm (P < 0.05, confidence interval [CI]: 0.09-3.16) and USF by 0.37 cm (P < 0.01, CI: 0.19-0.56) among the daughters (but not the sons) of HR compared with those of NR mothers, and by 1.32 cm (P < 0.05, CI: 0.09-2.55) and 0.18 cm (P < 0.05, CI: 0.04-0.32), respectively in the corresponding father-son (but not father-daughter) pairings. No such differences could be demonstrated for WC|BMI . A standard deviation score 1(SDS) change in WC|BMI , independent of BMI, was associated with a 7.14% change in IR in girls (P < 0.01, CI: 1.76-12.80) and 8.02% in boys (P < 0.001, CI: 2.93-13.36), but there was no relationship between IR and USF. The relationship of offspring WC to metabolic health and to parental size is complex. Subcutaneous abdominal fat is gender assortative but harmless, while intra-abdominal fat (its surrogate in this analysis) is unrelated to parental waist circumference, but metabolically harmful. © 2013 The Authors. Pediatric Obesity © 2013 International Association for the Study of Obesity.

  10. USF Equitable Distribution Act of 2013

    THOMAS, 113th Congress

    Sen. Ayotte, Kelly [R-NH

    2013-11-21

    Senate - 11/21/2013 Read twice and referred to the Committee on Commerce, Science, and Transportation. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  11. 32 CFR 171.4 - Qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of meeting the terms and conditions of a contract to deliver fire retardant by air. (a) Prior to... the USDA contract. (b) This requirement may not be delegated to the U.S. Forest Service (USFS). ...

  12. Learning about Antiphospholipid Syndrome (APS)

    MedlinePlus

    ... rarediseasesnetwork.epi.usf.edu] An integrated group of academic medical centers, patient support organizations, and clinical research ... Diseases (4th ed.), Mackay IR, Rose NR, eds. Academic Press/Elsevier Science. 2006. Williams Hematology, 6th ed., ...

  13. 2003 Florida transportation almanac

    DOT National Transportation Integrated Search

    2003-12-01

    This publication is the third edition of the Florida Transportation Almanac, developed and produced by the : Center for Urban Transportation Research (CUTR) at the University of South Florida (USF) in Tampa. It : follows the original publication prod...

  14. Teaching marine science to the next generation: Innovative programs for 6th”8th Graders gain momentum

    NASA Astrophysics Data System (ADS)

    Tebbens, S. F.; Coble, P. G.; Greely, T.

    Three educational outreach programs designed for middle school students (grades 6, 7, and 8) by faculty at the University of South Florida (USF) Department of Marine Science are turning kids onto science. The programs are bringing marine science research and its various technologies into the classroom, where students follow up with hands-on activities. Project Oceanography (PO) is an interactive broadcast that exposes students to the concepts and tools of current marine science research. The Oceanography Camp for Girls (OCG) boosts girls' curiosity and interest in science and nature. And teachers become better equipped to present current marine science topics and technology to their students at the Teachers Oceanography Workshop (TOW). All of the programs created by USF are provided at no cost to students or their institutions.

  15. Combating the stress of residency: one school's approach.

    PubMed

    Dabrow, Sharon; Russell, Stephen; Ackley, Karen; Anderson, Eric; Fabri, Peter Jeff

    2006-05-01

    Residency is a time of stress and turmoil for many residents. The stresses are varied and great, often involving both personal and professional issues. One institutional mechanism that has been shown to help residents cope with stress is the use of residents' wellness, or assistance, programs. The University of South Florida (USF) College of Medicine developed the USF Residency Assistance Program (RAP) in 1997, modeled after business employee assistance programs but tailored to enhance the well-being of residents. The program was developed in an organized, thoughtful manner starting with a Request for Proposals to all local employee assistance programs and the selection of one of these to run the program. The RAP is broad-based, readily available, easily accessible, totally voluntary and confidential, and not reportable to the state board of medicine. It is well integrated into all residency programs and has had excellent acceptance from the administration; information about access to the RAP is available to all residents through multiple venues. The cost is minimal, at only seven cents a day per resident. The authors present data from the eight years the RAP has been operating, including information on program use, referral rates, acceptance, and types of problems encountered. One suicide occurred during this time period, and the RAP provided a significant role in grief counseling. Assistance programs are critical to the well-being of residents. The USF program presents a model that can be used by other programs around the country.

  16. Visitor Access and Transportation Guide.

    DOT National Transportation Integrated Search

    2011-09-30

    This visitor access and transportation guide presents opportunities to manage or improve circulation and travel patterns in areas managed by Federal Land Management Agencies (FLMAs), such as the National Park Service (NPS), U.S. Forest Service (USFS)...

  17. Biochemical and Structural Analysis of an Eis Family Aminoglycoside Acetyltransferase from Bacillus anthracis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, Keith D.; Biswas, Tapan; Chang, Changsoo

    Proteins from the enhanced intracellular survival (Eis) family are versatile acetyltransferases that acetylate amines at multiple positions of several aminoglycosides (AGs). Their upregulation confers drug resistance. Homologues of Eis are present in diverse bacteria, including many pathogens. Eis from Mycobacterium tuberculosis (Eis_Mtb) has been well characterized. In this study, we explored the AG specificity and catalytic efficiency of the Eis family protein from Bacillus anthracis (Eis_Ban). Kinetic analysis of specificity and catalytic efficiency of acetylation of six AGs indicates that Eis_Ban displays significant differences from Eis_Mtb in both substrate binding and catalytic efficiency. The number of acetylated amines was alsomore » different for several AGs, indicating a distinct regiospecificity of Eis_Ban. Furthermore, most recently identified inhibitors of Eis_Mtb did not inhibit Eis_Ban, underscoring the differences between these two enzymes. To explain these differences, we determined an Eis_Ban crystal structure. The comparison of the crystal structures of Eis_Ban and Eis_Mtb demonstrates that critical residues lining their respective substrate binding pockets differ substantially, explaining their distinct specificities. Our results suggest that acetyltransferases of the Eis family evolved divergently to garner distinct specificities while conserving catalytic efficiency, possibly to counter distinct chemical challenges. The unique specificity features of these enzymes can be utilized as tools for developing AGs with novel modifications and help guide specific AG treatments to avoid Eis-mediated resistance.« less

  18. Update on the Caspar Creek watershed study

    Treesearch

    Peter Cafferata

    1987-01-01

    Readers of this Newsletter are aware that CDF and the USFS, through its Pacific Southwest Forest and Range Experiment Stationa at Arcata (PSW), are carrying out a long term cooperative watershed experiment in JDSF's Caspar Creek drainage.

  19. Impacts of dialysis transportation on Florida's coordinated public transportation programs.

    DOT National Transportation Integrated Search

    2014-04-01

    The National Center for Transit Research (NCTR) at the University of South Florida (USF) collected quantitative and qualitative data from Community Transportation Coordinators (CTCs) throughout Florida. An online survey and a series of personal inter...

  20. Florida public transportation anti-terrorism resource guide

    DOT National Transportation Integrated Search

    2001-10-01

    The Center for Urban Transportation (CUTR) at the University of South Florida (USF) assembled this guide to provide public transit agencies in Florida with information on current resources available to assist them with improving system security and g...

  1. USGS Field Activities 12BHM01, 12BHM02, 12BHM03, 12BHM04, and 12BHM05 on the West Florida Shelf, in February, April, May, June, and August 2012

    USGS Publications Warehouse

    Robbins, Lisa L.; Knorr, Paul O.; Daly, Kendra L.; Barrera, Kira E.

    2014-01-01

    As part of the U.S. Geological Survey (USGS) Coastal and Marine Geology Program project "Response of Florida Shelf Ecosystems to Climate Change" and in partnership with Kendra Daly, University of South Florida (USF), data on surface ocean carbonate chemistry were collected on five cruises along transects on the shallow inner west Florida shelf and northern Gulf of Mexico in 2012. Data from the 2011 cruises were also published (Robbins and others., 2013). The data collected allows the USGS, National Oceanic and Atmospheric Administration (NOAA), and USF scientists to map variations in ocean chemistry including carbonate saturation states along designated tracks. The USGS also partners with NOAA and the National Aeronautics and Space Administration (NASA) to model air-sea flux as part of a Gulf of Mexico Carbon Synthesis project led by NASA.

  2. The effect of changes in the USF/NASA toxicity screening test method on data from some cellular polymers

    NASA Technical Reports Server (NTRS)

    Hilado, C. J.; Miller, C. M.

    1976-01-01

    Rankings of relative toxicity can be markedly affected by changes in test variables. Revision of the USF/NASA toxicity screening test procedure to eliminate the connecting tube and supporting floor and incorporate a 1.0 g sample weight, 200 C starting temperature, and 800 C upper limit temperature for pyrolysis, reversed the rankings of flexible polyurethane and polychloroprene foams, not only in relation to each other, but also in relation to cotton and red oak. Much of the change is attributed to reduction of the distance between the sample and the test animals, and reduction of the sample weight charged. Elimination of the connecting tube increased the relative toxicity of the polyurethane foams. The materials tested were flexible polyurethane foam, without and with fire retardant; rigid polyurethane foam with fire retardant; flexible polychloroprene foam; cotton, Douglas fir, red oak, hemlock, hardboard, particle board, polystyrene, and polymethyl methacrylate.

  3. USGS field activities 11BHM03 and 11BHM04 on the west Florida shelf, Gulf of Mexico, September and November 2011

    USGS Publications Warehouse

    Robbins, Lisa L.; Knorr, Paul O.; Daly, Kendra L.; Barrera, Kira E.

    2014-01-01

    During September and November 2011 the (USGS), in cooperation with (USF), conducted geochemical surveys on the west Florida Shelf to investigate the effects of climate change on ocean acidification within the northern Gulf of Mexico, specifically, the effect of ocean acidification on marine organisms and habitats. The first cruise was conducted from September 20 to 28 (11BHM03) and the second was from November 2 to 4 (11BHM04). To view each cruise's survey lines, please see the Trackline page. Each cruise took place aboard the Research Vessel (R/V) Weatherbird II, a ship of opportunity led by Dr. Kendra Daly (USF), which departed from and returned to Saint Petersburg, Florida. Data collection included sampling of the surface and water column with lab analysis of pH, dissolved inorganic carbon (DIC) or total carbon dioxide (TCO2), and total alkalinity (TA). lLb analysis was augmented with a continuous flow-through system (referred to as sonde data) with a conductivity-temperature-depth (CTD) sensor, which also recorded salinity and pH. Corroborating the USGS data are the vertical CTD profiles (referred to as station samples) collected by USF. The CTD casts measured continuous vertical profiles of oxygen, chlorophyll fluorescence and optical backscatter. Discrete samples for nutrients, chlorophyll, and particulate organic carbon/nitrogen were also collected during the CTD casts. Two autonomous flow-through (AFT) instruments recorded pH and CO2 every 3-5 minutes on each cruise (referred to as AFT data).

  4. USGS field activities 11BHM01 and 11BHM02 on the west Florida shelf, Gulf of Mexico, May and June 2011

    USGS Publications Warehouse

    Robbins, Lisa L.; Knorr, Paul O.; Daly, Kendra L.; Taylor, Carl A.; Barrera, Kira E.

    2014-01-01

    During May and June 2011 the (USGS), in cooperation with (USF), conducted geochemical surveys on the west Florida Shelf to investigate the effects of climate change on ocean acidification within the northern Gulf of Mexico, specifically, the effect of ocean acidification on marine organisms and habitats. The first cruise was conducted from May 3 to 9 (11BHM01) and the second was from June 25 to 30 (11BHM02). To view each cruise's survey lines, please see the Trackline page. Each cruise took place aboard the Research Vessel (R/V) Weatherbird II, a ship of opportunity led by Dr. Kendra Daly (USF), which departed from and returned to Saint Petersburg, Florida. Data collection included sampling of the surface and water column with lab analysis of pH, dissolved inorganic carbon (DIC) or total carbon dioxide (TCO2), and total alkalinity (TA). lLb analysis was augmented with a continuous flow-through system (referred to as sonde data) with a conductivity-temperature-depth (CTD) sensor, which also recorded salinity and pH. Corroborating the USGS data are the vertical CTD profiles (referred to as station samples) collected by USF. The CTD casts measured continuous vertical profiles of oxygen, chlorophyll fluorescence and optical backscatter. Discrete samples for nutrients, chlorophyll, and particulate organic carbon/nitrogen were also collected during the CTD casts. Two autonomous flow-through (AFT) instruments recorded pH and CO2 every 3-5 minutes on each cruise (referred to as AFT data).

  5. Yersinia enterocolitica YopT and Clostridium difficile Toxin B Induce Expression of GILZ in Epithelial Cells

    PubMed Central

    Köberle, Martin; Göppel, David; Grandl, Tanja; Gaentzsch, Peer; Manncke, Birgit; Berchtold, Susanne; Müller, Steffen; Lüscher, Bernhard; Asselin-Labat, Marie-Liesse; Pallardy, Marc; Sorg, Isabel; Langer, Simon; Barth, Holger; Zumbihl, Robert; Autenrieth, Ingo B.; Bohn, Erwin

    2012-01-01

    Glucocorticoid induced-leucine zipper (GILZ) has been shown to be induced in cells by different stimuli such as glucocorticoids, IL-10 or deprivation of IL-2. GILZ has anti-inflammatory properties and may be involved in signalling modulating apoptosis. Herein we demonstrate that wildtype Yersinia enterocolitica which carry the pYV plasmid upregulated GILZ mRNA levels and protein expression in epithelial cells. Infection of HeLa cells with different Yersinia mutant strains revealed that the protease activity of YopT, which cleaves the membrane-bound form of Rho GTPases was sufficient to induce GILZ expression. Similarly, Clostridium difficile toxin B, another bacterial inhibitor of Rho GTPases induced GILZ expression. YopT and toxin B both increased transcriptional activity of the GILZ promoter in HeLa cells. GILZ expression could not be linked to the inactivation of an individual Rho GTPase by these toxins. However, forced expression of RhoA and RhoB decreased basal GILZ promoter activity. Furthermore, MAPK activation proved necessary for profound GILZ induction by toxin B. Promoter studies and gel shift analyses defined binding of upstream stimulatory factor (USF) 1 and 2 to a canonical c-Myc binding site (E-box) in the GILZ promoter as a crucial step of its trans-activation. In addition we could show that USF-1 and USF-2 are essential for basal as well as toxin B induced GILZ expression. These findings define a novel way of GILZ promoter trans-activation mediated by bacterial toxins and differentiate it from those mediated by dexamethasone or deprivation of IL-2. PMID:22792400

  6. Travel to Food : Transportation Barriers for the Food Insecure in Tampa Bay

    DOT National Transportation Integrated Search

    2017-09-01

    In partnership with the Center for Urban Transportation Research (CUTR) at the University of South Florida (USF), the Transportation Innovation Group informed practical transportation solutions aimed at improved food access in Tampa Bay (Hillsborough...

  7. Analysis of the Status and Impacts of NCTR Projects

    DOT National Transportation Integrated Search

    2012-08-01

    The National Center for Transit Research (NCTR) at the University of South Florida (USF) assessed the implementation status and identified the outcomes and impacts of the results of 30 Florida Department of Transportation -sponsored NCTR research pro...

  8. 78 FR 29063 - Survey of Urban Rates for Fixed Voice and Fixed Broadband Residential Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... in alternative formats (computer diskette, large print, audio record, and Braille). Persons with... Company Name: Provider FRN (used on MONTH DAY, YEAR Form 477): Provider Study Area Code (if current USF...

  9. Eis, a novel family of arylalkylamine N-acetyltransferase (EC 2.3.1.87).

    PubMed

    Pan, Qian; Zhao, Feng-Lan; Ye, Bang-Ce

    2018-02-05

    Enhanced intracellular survival (Eis) proteins were found to enhance the intracellular survival of mycobacteria in macrophages by acetylating aminoglycoside antibiotics to confer resistance to these antibiotics and by acetylating DUSP16/MPK-7 to suppress host innate immune defenses. Eis homologs composing of two GCN5 N-acetyltransferase regions and a sterol carrier protein fold are found widely in gram-positive bacteria. In this study, we found that Eis proteins have an unprecedented ability to acetylate many arylalkylamines, are a novel type of arylalkylamine N-acetyltransferase AANAT (EC 2.3.1.87). Sequence alignment and phyletic distribution analysis confirmed Eis belongs to a new aaNAT-like cluster. Among the cluster, we studied three typical Eis proteins: Eis_Mtb from Mycobacterium tuberculosis, Eis_Msm from Mycobacterium smegmatis, and Eis_Sen from Saccharopolyspora erythraea. Eis_Mtb prefers to acetylate histamine and octopamine, while Eis_Msm uses tyramine and octopamine as substrates. Unlike them, Eis_Sen exihibits good catalytic efficiencies for most tested arylalkylamines. Considering arylalkylamines such as histamine plays a fundamental role in immune reactions, future work linking of AANAT activity of Eis proteins to their physiological function will broaden our understanding of gram-positive pathogen-host interactions. These findings shed insights into the molecular mechanism of Eis, and reveal potential clinical implications for many gram-positive pathogens.

  10. Emotional intelligence in sport and exercise: A systematic review.

    PubMed

    Laborde, S; Dosseville, F; Allen, M S

    2016-08-01

    This review targets emotional intelligence (EI) in sport and physical activity. We systematically review the available literature and offer a sound theoretical integration of differing EI perspectives (the tripartite model of EI) before considering applied practice in the form of EI training. Our review identified 36 studies assessing EI in an athletic or physical activity context. EI has most often been conceptualized as a trait. In the context of sport performance, we found that EI relates to emotions, physiological stress responses, successful psychological skill usage, and more successful athletic performance. In the context of physical activity, we found that trait EI relates to physical activity levels and positive attitudes toward physical activity. There was a shortage of research into the EI of coaches, officials, and spectators, non-adult samples, and longitudinal and experimental methods. The tripartite model proposes that EI operates on three levels - knowledge, ability, and trait - and predicts an interplay between the different levels of EI. We present this framework as a promising alternative to trait and ability EI conceptualizations that can guide applied research and professional practice. Further research into EI training, measurement validation and cultural diversity is recommended. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  11. Turn exchange rhythm in English dialogues

    NASA Astrophysics Data System (ADS)

    Fon, Janice

    2005-09-01

    This study looked at the relationship between rhythm and exchange type in British English, a stress-timed language, and Singaporean English, a syllable-timed language, using a spontaneous speech corpus. Exchange intervals (EIs), or the time difference between the end of one speaker and the beginning of another, were measured and exchanges of different types were labeled. Results showed that, in a dialogue, EIs were generally limited to a narrow range. However, within this range, EIs had at least four functions. First, EIs were reflective of the cognitive load and functioned as a way to differentiate various exchange types. Those requiring more cognitive resources, such as question-and-answer pairs, generally needed longer EIs than those not as cognitively loaded, such as backchanneling pairs. Second, EIs were indicative of linguistic rhythm. Singaporean English tended to have shorter EIs than British English. Third, EIs were reflective of politeness. The degree of politeness correlated negatively with EI. Shorter EIs showed a higher degree of respect. Finally, EIs were also indicative of the level of insecurity of a speaker, which was best reflected by gender differences. Females in general had longer EIs than males.

  12. Ecosystem Services Derived from Headwater Catchments

    EPA Science Inventory

    We used data from the USEPA’s wadeable streams assessment (WSA), US Forest Service’s forest inventory and analysis (FIA), and select USFS experimental forests (EF) to investigate potential ecosystems services derived from headwater catchments. C, N, and P inputs to these catchmen...

  13. Emotional intelligence and nursing: an integrative literature review.

    PubMed

    Bulmer Smith, Karen; Profetto-McGrath, Joanne; Cummings, Greta G

    2009-12-01

    The purpose of this paper is to present findings of an integrative literature review related to emotional intelligence (EI) and nursing. A large body of knowledge related to EI exists outside nursing. EI theory and research within nursing is a more recent phenomenon. A broad understanding of the nature and direction of theory and research related to EI is crucial to building knowledge within this field of inquiry. A broad search of computerized databases focusing on articles published in English during 1995-2007 was completed. Extensive screening sought to determine current literature themes and empirical research evidence completed in nursing focused specifically on emotional intelligence. 39 articles are included in this integrative literature review (theoretical, n=21; editorial, n=5; opinion, n=4 and empirical, n=9). The literature focuses on EI and nursing education, EI and nursing practice, EI and clinical decision-making, and EI and clinical leadership. Research that links EI and nursing are mostly correlation designs using small sample sizes. This literature reveals widespread support of EI concepts in nursing. Theoretical and editorial literature confirms EI concepts are central to nursing practice. EI needs to be explicit within nursing education as EI might impact the quality of student learning, ethical decision-making, critical thinking, evidence and knowledge use in practice. Emotionally intelligent leaders influence employee retention, quality of patient care and patient outcomes. EI research in nursing requires development and careful consideration of criticisms related to EI outside nursing is recommended.

  14. 12 CFR 1815.109 - Preparation of an EIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Preparation of an EIS. 1815.109 Section 1815... ENVIRONMENTAL QUALITY § 1815.109 Preparation of an EIS. (a) If the Fund determines that an EIS should be... or have prepared the EIS. Procedures for preparing the EIS are set forth in 40 CFR part 1502 of the...

  15. Why does self-reported emotional intelligence predict job performance? A meta-analytic investigation of mixed EI.

    PubMed

    Joseph, Dana L; Jin, Jing; Newman, Daniel A; O'Boyle, Ernest H

    2015-03-01

    Recent empirical reviews have claimed a surprisingly strong relationship between job performance and self-reported emotional intelligence (also commonly called trait EI or mixed EI), suggesting self-reported/mixed EI is one of the best known predictors of job performance (e.g., ρ = .47; Joseph & Newman, 2010b). Results further suggest mixed EI can robustly predict job performance beyond cognitive ability and Big Five personality traits (Joseph & Newman, 2010b; O'Boyle, Humphrey, Pollack, Hawver, & Story, 2011). These criterion-related validity results are problematic, given the paucity of evidence and the questionable construct validity of mixed EI measures themselves. In the current research, we update and reevaluate existing evidence for mixed EI, in light of prior work regarding the content of mixed EI measures. Results of the current meta-analysis demonstrate that (a) the content of mixed EI measures strongly overlaps with a set of well-known psychological constructs (i.e., ability EI, self-efficacy, and self-rated performance, in addition to Conscientiousness, Emotional Stability, Extraversion, and general mental ability; multiple R = .79), (b) an updated estimate of the meta-analytic correlation between mixed EI and supervisor-rated job performance is ρ = .29, and (c) the mixed EI-job performance relationship becomes nil (β = -.02) after controlling for the set of covariates listed above. Findings help to establish the construct validity of mixed EI measures and further support an intuitive theoretical explanation for the uncommonly high association between mixed EI and job performance--mixed EI instruments assess a combination of ability EI and self-perceptions, in addition to personality and cognitive ability. PsycINFO Database Record (c) 2015 APA, all rights reserved.

  16. Auk Village Recreational Area : Conceptual Parking and Road Improvements Analysis.

    DOT National Transportation Integrated Search

    2008-07-01

    The U.S. Forest Service, Alaska region, Tongass National Forest (USFS), plans to make improvements to the Auk Village Recreation Area (AVRA or recreation area) and specifically Point Louisa Road (the road or roadway) which passes through the AVRA. Th...

  17. Effect of test conditions on relative toxicity rankings of fifteen materials

    NASA Technical Reports Server (NTRS)

    Hilado, C. J.; Cumming, H. J.

    1977-01-01

    Fifteen materials were evaluated for relative toxicity of pyrolysis effluents, using different test conditions in the USF methodology. Wool fabrics were consistently among the most toxic materials, and polystyrene and polychloroprene flexible foam were consistently among the least toxic materials.

  18. The Contribution of Emotional Intelligence to Decisional Styles among Italian High School Students

    ERIC Educational Resources Information Center

    Di Fabio, Annamaria; Kenny, Maureen E.

    2012-01-01

    This study examined the relationship between emotional intelligence (EI) and styles of decision making. Two hundred and six Italian high school students completed two measures of EI, the Bar-On EI Inventory, based on a mixed model of EI, and the Mayer Salovey Caruso EI Test, based on an ability-based model of EI, in addition to the General…

  19. Brain in situ hybridization maps as a source for reverse-engineering transcriptional regulatory networks: Alzheimer's disease insights

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acquaah-Mensah, George K.; Taylor, Ronald C.

    Microarray data have been a valuable resource for identifying transcriptional regulatory relationships among genes. As an example, brain region-specific transcriptional regulatory events have the potential of providing etiological insights into Alzheimer Disease (AD). However, there is often a paucity of suitable brain-region specific expression data obtained via microarrays or other high throughput means. The Allen Brain Atlas in situ hybridization (ISH) data sets (Jones et al., 2009) represent a potentially valuable alternative source of high-throughput brain region-specific gene expression data for such purposes. In this study, Allen BrainAtlasmouse ISH data in the hippocampal fields were extracted, focusing on 508 genesmore » relevant to neurodegeneration. Transcriptional regulatory networkswere learned using three high-performing network inference algorithms. Only 17% of regulatory edges from a network reverse-engineered based on brain region-specific ISH data were also found in a network constructed upon gene expression correlations inmousewhole brain microarrays, thus showing the specificity of gene expression within brain sub-regions. Furthermore, the ISH data-based networks were used to identify instructive transcriptional regulatory relationships. Ncor2, Sp3 and Usf2 form a unique three-party regulatory motif, potentially affecting memory formation pathways. Nfe2l1, Egr1 and Usf2 emerge among regulators of genes involved in AD (e.g. Dhcr24, Aplp2, Tia1, Pdrx1, Vdac1, andSyn2). Further, Nfe2l1, Egr1 and Usf2 are sensitive to dietary factors and could be among links between dietary influences and genes in the AD etiology. Thus, this approach of harnessing brain region-specific ISH data represents a rare opportunity for gleaning unique etiological insights for diseases such as AD.« less

  20. Some Recent USF Studies at Volcanoes in Central America

    NASA Astrophysics Data System (ADS)

    McNutt, S. R.

    2014-12-01

    Scientists at the University of South Florida (USF) have been working in Central America for several decades. Efforts have focused on Physical Volcanology in Nicaragua, GPS in Costa Rica, and assessment of Geothermal projects in El Salvador, amongst others. Two years ago a Seismology Lab was established at USF. Personnel now include three Professors, a Post-Doc, and 4 graduate students. Seismic and GPS networks were installed at Telica Volcano, Nicaragua, in 2010 by Roman, LaFemina and colleagues. Data are recorded on site and recovered several times per year at this persistently restless volcano, which has rates of 5 to 1400 low frequency seismic events per day (Rodgers et al., submitted). Proposals have been submitted to install instruments on other Nicaraguan volcanoes, including seismometers, GPS, infrasound, and lightning sensors. This suite of instruments has proven to be very effective to study a range of volcanic processes. The proposals have not been successful to date (some are pending), and alternative funding sources are being explored. One interesting scientific issue is the presence of strong seasonal effects, specifically a pronounced rainy season and dry season and possible interaction between shallow volcanic processes and surface waters. We are also pursuing a variety of studies that are complementary to the instrumental efforts. One such study is examining volcanic earthquake swarms, with the focus to date on identifying diagnostics. One clear pattern is that peak rates often occur early in swarms, whereas the largest M event occurs late. Additional evidence suggests that the seismic source size grows systematically, especially for events with similar waveforms (families). Recognition of such patterns, linked to processes, may help to improve monitoring and better take advantage of instrumental data to reduce vulnerability from eruptions.

  1. Age and gender differences in ability emotional intelligence in adults: A cross-sectional study.

    PubMed

    Cabello, Rosario; Sorrel, Miguel A; Fernández-Pinto, Irene; Extremera, Natalio; Fernández-Berrocal, Pablo

    2016-09-01

    The goal of the current investigation was to analyze ability emotional intelligence (EI) in a large cross-sectional sample of Spanish adults (N = 12,198; males, 56.56%) aged from 17 to 76 years (M = 37.71, SD = 12.66). Using the Mayer-Salovey-Caruso Emotional Intelligence Test (MSCEIT), which measures ability EI according to the 4 branches of the Mayer and Salovey EI model. The authors examined effects of gender on ability EI, as well as the linear and quadratic effects of age. Results suggest that gender affects the total ability EI score as well as scores on the 4 EI branches. Ability EI was greater in women than men. Ability EI varied with age according to an inverted-U curve: Younger and older adults scored lower on ability EI than middle-aged adults, except for the branch of understanding emotions. These findings strongly support the idea that both gender and age significantly influence ability EI during aging. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  2. 76 FR 76972 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... Supplement, USFS, 00, Programmatic--Kootenai, Idaho Panhandle, and Lolo National Forest Plan Amendments for... has been Identified as the Forest Service's Preferred Alternative, ID, WA, MT, Review Period Ends: 01... Basin Management Unit South Shore Fuel Reduction and Healthy Forest Restoration, To Manage Fuel...

  3. White River National Forest Hanging Lake transportation and operations study

    DOT National Transportation Integrated Search

    2017-05-01

    Hanging Lake is a recreation site located on land managed by the U.S. Forest Service (USFS) under the jurisdiction of the White River National Forests Eagle-Holy Cross Ranger District. Due to its increasing popularity over the past few years, the ...

  4. View of HiattStricklin property privy/outhouse. Note siding and shed design, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Hiatt-Stricklin property privy/outhouse. Note siding and shed design, facing northwest - Hiatt Property, Privy-Outhouse, West bank of Woof Creek, 400 feet northwest of intersection of U.S.F.S. Roads 651 & 349, Placerville, Boise County, ID

  5. Potential of VIIRS Time Series Data for Aiding the USDA Forest Service Early Warning System for Forest Health Threats: A Gypsy Moth Defoliation Case Study

    NASA Technical Reports Server (NTRS)

    Spruce, Joseph P.; Ryan, Robert E.; McKellip, Rodney

    2008-01-01

    The Healthy Forest Restoration Act of 2003 mandated that a national forest threat Early Warning System (EWS) be developed. The USFS (USDA Forest Service) is currently building this EWS. NASA is helping the USFS to integrate remotely sensed data into the EWS, including MODIS data for monitoring forest disturbance at broad regional scales. This RPC experiment assesses the potential of VIIRS (Visible/Infrared Imager/Radiometer Suite) and MODIS (Moderate Resolution Imaging Spectroradiometer) data for contribution to the EWS. In doing so, the RPC project employed multitemporal simulated VIIRS and MODIS data for detecting and monitoring forest defoliation from the non-native Eurasian gypsy moth (Lymantria despar). Gypsy moth is an invasive species threatening eastern U.S. hardwood forests. It is one of eight major forest insect threats listed in the Healthy Forest Restoration Act of 2003. This RPC experiment is relevant to several nationally important mapping applications, including carbon management, ecological forecasting, coastal management, and disaster management

  6. Griffith Energy Project Final Environmental Impact Statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner,more » needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.« less

  7. Measurement of ability emotional intelligence: results for two new tests.

    PubMed

    Austin, Elizabeth J

    2010-08-01

    Emotional intelligence (EI) has attracted considerable interest amongst both individual differences researchers and those in other areas of psychology who are interested in how EI relates to criteria such as well-being and career success. Both trait (self-report) and ability EI measures have been developed; the focus of this paper is on ability EI. The associations of two new ability EI tests with psychometric intelligence, emotion perception, and the Mayer-Salovey-Caruso EI test (MSCEIT) were examined. The new EI tests were the Situational Test of Emotion Management (STEM) and the Situational Test of Emotional Understanding (STEU). Only the STEU and the MSCEIT Understanding Emotions branch were significantly correlated with psychometric intelligence, suggesting that only understanding emotions can be regarded as a candidate new intelligence component. These understanding emotions tests were also positively correlated with emotion perception tests, and STEM and STEU scores were positively correlated with MSCEIT total score and most branch scores. Neither the STEM nor the STEU were significantly correlated with trait EI tests, confirming the distinctness of trait and ability EI. Taking the present results as a starting-point, approaches to the development of new ability EI tests and models of EI are suggested.

  8. EI competencies as a related but different characteristic than intelligence

    PubMed Central

    Boyatzis, Richard E.; Batista-Foguet, Joan M.; Fernández-i-Marín, Xavier; Truninger, Margarida

    2015-01-01

    Amid the swarm of debate about emotional intelligence (EI) among academics are claims that cognitive intelligence, or general mental ability (g), is a stronger predictor of life and work outcomes as well as the counter claims that EI is their strongest predictor. Nested within the tempest in a teapot are scientific questions as to what the relationship is between g and EI. Using a behavioral approach to EI, we examined the relationship of a parametric measure of g as the person’s GMAT scores and collected observations from others who live and work with the person as to the frequency of his or her EI behavior, as well as the person’s self-assessment. The results show that EI, as seen by others, is slightly related to g, especially for males with assessment from professional relations. Further, we found that cognitive competencies are more strongly related to GMAT than EI competencies. For observations from personal relationships or self-assessment, there is no relationship between EI and GMAT. Observations from professional relations reveal a positive relationship between cognitive competencies and GMAT and EI and GMAT for males, but a negative relationship between EI and GMAT for females. PMID:25713545

  9. EI competencies as a related but different characteristic than intelligence.

    PubMed

    Boyatzis, Richard E; Batista-Foguet, Joan M; Fernández-I-Marín, Xavier; Truninger, Margarida

    2015-01-01

    Amid the swarm of debate about emotional intelligence (EI) among academics are claims that cognitive intelligence, or general mental ability (g), is a stronger predictor of life and work outcomes as well as the counter claims that EI is their strongest predictor. Nested within the tempest in a teapot are scientific questions as to what the relationship is between g and EI. Using a behavioral approach to EI, we examined the relationship of a parametric measure of g as the person's GMAT scores and collected observations from others who live and work with the person as to the frequency of his or her EI behavior, as well as the person's self-assessment. The results show that EI, as seen by others, is slightly related to g, especially for males with assessment from professional relations. Further, we found that cognitive competencies are more strongly related to GMAT than EI competencies. For observations from personal relationships or self-assessment, there is no relationship between EI and GMAT. Observations from professional relations reveal a positive relationship between cognitive competencies and GMAT and EI and GMAT for males, but a negative relationship between EI and GMAT for females.

  10. Self-Reported Interview-Assisted Diet Records Underreport Energy Intake in Maintenance Hemodialysis Patients.

    PubMed

    Shapiro, Bryan B; Bross, Rachelle; Morrison, Gillian; Kalantar-Zadeh, Kamyar; Kopple, Joel D

    2015-07-01

    Studies suggest that maintenance hemodialysis (MHD) patients report dietary energy intakes (EIs) that are lower than what is actually ingested. Data supporting this conclusion have several important limitations. The present study introduces a novel approach of assessing underreporting of EI in MHD patients. Comparisons of EI of free-living MHD patients determined from food records to their measured energy needs. Metabolic research ward. Thirteen clinically stable MHD patients with unchanging weights whose EI was assessed by dietitian interview-assisted 3-day food records. EI was compared with (1) patients' resting energy expenditure (REE), measured by indirect calorimetry, and estimated total energy expenditure (TEE) and (2) patients' dietary energy requirements (DER) measured while patients underwent nitrogen balance studies and consumed a constant energy diet in a research ward for a mean duration of 89.5 days. DER was calculated as the actual EI during the research study corrected for changes in body fat and lean body mass measured by Dual X-Ray Absorptiometry. Underreporting of EI was determined by an EI:REE ratio <1.27 and an EI:TEE ratio or EI:DEE ratio <1.0. Seven of the 13 MHD patients studied were male. Patient's ages were 47.7 ± standard deviation 9.7 years; body mass index averaged 25.4 ± 2.8 kg/m2, and dialysis vintage was 53.3 ± 37.1 months. The EI:REE ratio (1.03 ± 0.23) was significantly less than the cutoff value for underreporting of 1.27 (P = .001); 12 of 13 patients had EI:REE ratios <1.27. The mean EI:TEE ratio was significantly less than the cutoff value of 1.0 (0.73 ± 0.17, P < .0001), and 12 MHD patients had EI:TEE ratios <1.0. The EI:DER ratio was also <1.0 (0.83 ± 0.25, P = .012), and 10 MHD had EI:DER ratios <1.0. Dietitian interview-assisted diet records by MHD patients substantially underestimate the patient's dietary EI. Copyright © 2015 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  11. Nutritional compensation to exercise- vs. diet-induced acute energy deficit in adolescents with obesity.

    PubMed

    Thivel, David; Doucet, Eric; Julian, Valérie; Cardenoux, Charlotte; Boirie, Yves; Duclos, Martine

    2017-07-01

    To compare the energy and macronutrient intake responses to equivalent energy deficits induced by diet (food restriction) and exercise in adolescents with obesity. Fourteen 12-15years old obese adolescents completed three experimental conditions (08:00am to 07:30pm) in a randomized crossover design: i) control session (CON); ii) diet-induced 25% energy depletion (Def-EI), iii) and an exercise-induced 25% energy depletion (Def-EX). The sessions order was either CON/Def-EI/Def-EX or CON/Def-EX/Def-EI as the deficit corresponded to 25% of the energy ingested at lunch on the control day (CON) and was imposed either by exercise (Def-EX) or diet (Def-EI). Ad libitum EI and macronutrients preferences were assessed at dinner and appetite sensations assessed using visual analogue scales. Mean BMI was 36.6±5.0kg/m 2 (z-BMI: 2.40±0.29). The individually calibrated 25% energy deficit represented 254±92kcal. Ad libitum EI was significantly higher during both Def-EX (971±225kcal) and Def-EI (949±246kcal) compared with CON (742±297) (p<0.05). The relative energy ingested derived from fat was significantly higher on both Def-EX (36.6±10.9%) and Def-EI (36.9±13.1%) compared with CON (21.6±7.8%) (p<0.05). The energy derived from carbohydrates was significantly lower on both Def-EX (48.3±9.0%) and Def-EI (44.4±17.3%) compare with CON (61.1±10.1%) (p<0.05). Appetite sensations were not different between conditions. The induced energy deficit was negatively correlated with the ad libitum EI difference between the exercise and the control session (EI Def-EX - EI CON) (r=-0,643 p<0.05) and positively correlated with the EI difference between the dietary restriction and the control session (EI Def-EI - EI CON) (r=0,569 p<0.05). Equicaloric exercise- or diet-induced energy deficits could lead to similar EI compensation in obese adolescents but this EI compensation might be influenced by the magnitude of the deficit. Copyright © 2016 Elsevier Inc. All rights reserved.

  12. Molecular identification and first report of mitochondrial COI gene haplotypes in the hawksbill turtle Eretmochelys imbricata (Testudines: Cheloniidae) in the Colombian Caribbean nesting colonies.

    PubMed

    Daza-Criado, L; Hernández-Fernández, J

    2014-02-21

    Hawksbill sea turtles Eretmochelys imbricata are found extensively around the world, including the Atlantic, Pacific, and Indian Oceans; the Persian Gulf, and the Red and Mediterranean Seas. Populations of this species are affected by international trafficking of their shields, meat, and eggs, making it a critically endangered animal. We determined the haplotypes of 17 hawksbill foraging turtles of Islas del Rosario (Bolivar) and of the nesting beach Don Diego (Magdalena) in the Colombian Caribbean based on amplification and sequencing of the mitochondrial gene cytochrome oxidase c subunit I (COI). We identified 5 haplotypes, including EI-A1 previously reported in Puerto Rico, which was similar to 10 of the study samples. To our knowledge, the remaining 4 haplotypes have not been described. Samples EICOI11 and EICOI3 showed 0.2% divergence from EI-A1, by a single nucleotide change, and were classified as the EI-A2 haplotype. EICOI6, EICOI14, and EICOI12 samples showed 0.2% divergence from EI-A1 and 0.3% divergence from EI-A2 and were classified as EI-A3 haplotype. Samples EICOI16 and EICOI15 presented 5 nucleotide changes each and were classified as 2 different haplotypes, EI-A4 and EI-A5, respectively. The last 2 haplotypes had higher nucleotide diversity (K2P=1.7%) than that by the first 3 haplotypes. EI-A1 and EI-A2 occurred in nesting individuals, and EI-A2, EI-A3, EI-A4, and EI-A5 occurred in foraging individuals. The description of the haplotypes may be associated with reproductive migrations or foraging and could support the hypothesis of natal homing. Furthermore, they can be used in phylogeographic studies.

  13. 10 CFR 1021.330 - Programmatic (including site-wide) NEPA documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... prepare a programmatic EIS or EA (40 CFR 1502.4). DOE may also prepare a programmatic EIS or EA at any... Analysis, DOE shall determine whether the existing EIS remains adequate or whether to prepare a new site-wide EIS or supplement the existing EIS, as appropriate. The determination and supporting analysis...

  14. Relationship between athletes' emotional intelligence and precompetitive anxiety.

    PubMed

    Lu, Frank J-H; Li, Gladys Shuk-fong; Hsu, Eva Ya-wen; Williams, Lavon

    2010-02-01

    This study examined the relationship between athletes' Emotional Intelligence (EI) and precompetitive anxiety. Taiwanese intercollegiate track and field athletes (N = 111; 64 men, 47 women) completed the Bar-On EQ-i 1 mo. before a1 national intercollegiate athletic meet, and the Competition State Anxiety Inventory-2R 1 hr. before the competition. Analyses indicated that participants with the lowest EI scores reported greater intensity of precompetitive cognitive anxiety than those with the highest EI scores. No other statistically significant differences were found among the groups. Further, correlational analyses and multiple stepwise regression analyses revealed that EI components such as stress management, intrapersonal EI, and interpersonal EI were associated with precompetitive anxiety. Current EI measures provide limited understanding of precompetitive anxiety. A sport-specific EI measure is needed for future research.

  15. Viewing-zone control of integral imaging display using a directional projection and elemental image resizing method.

    PubMed

    Alam, Md Ashraful; Piao, Mei-Lan; Bang, Le Thanh; Kim, Nam

    2013-10-01

    Viewing-zone control of integral imaging (II) displays using a directional projection and elemental image (EI) resizing method is proposed. Directional projection of EIs with the same size of microlens pitch causes an EI mismatch at the EI plane. In this method, EIs are generated computationally using a newly introduced algorithm: the directional elemental image generation and resizing algorithm considering the directional projection geometry of each pixel as well as an EI resizing method to prevent the EI mismatch. Generated EIs are projected as a collimated projection beam with a predefined directional angle, either horizontally or vertically. The proposed II display system allows reconstruction of a 3D image within a predefined viewing zone that is determined by the directional projection angle.

  16. View of McKenzieRichey covered well showing log and lumber construction ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of McKenzie-Richey covered well showing log and lumber construction and shingles, facing southeast - McKenzie Property, Covered Well, North Bank of Sailor Gulch, 750 feet northwest of intersection of U.S.F.S. Roads 651 & 349, Placerville, Boise County, ID

  17. Design and evaluation of steel bridges with double composite action

    DOT National Transportation Integrated Search

    2010-02-01

    This report presents findings from a cooperative USF/URS/FDOT research study undertaken to develop design rules for : double composite steel bridges. In the study, a 48 ft long, 16 ft wide, 4 ft. 10 in. deep trapezoidal HPS 70W box section : desig...

  18. The potential for alternative transportation at Chimney Rock, San Juan National Forest

    DOT National Transportation Integrated Search

    2012-05-30

    Increased visitation at Chimney Rock in the San Juan National Forest in southwest Colorado has led to increasing interest in the addition of a shuttle system. Piloting a shuttle system at Chimney Rock is a relatively low-cost option that the USFS cou...

  19. USAC Annual Report, 2008

    ERIC Educational Resources Information Center

    Universal Service Administrative Company, 2009

    2009-01-01

    The Universal Service Administrative Company (USAC) is an independent, not-for-profit corporation designated as the administrator of the federal Universal Service Fund (USF) by the Federal Communications Commission (FCC). USAC administers the Universal Service Fund and the four Universal Service programs: High Cost, Low Income, Rural Health Care,…

  20. Library and Information Skills Workbook.

    ERIC Educational Resources Information Center

    Vastine, Jim

    This workbook for a library and information skills course at the University of South Florida (USF), Tampa campus, contains the following sections: (1) syllabus; (2) tentative course outline; (3) statement of the course goal, general objectives, and objectives related to LC (Library of Congress) classification and the online catalog, dictionaries…

  1. View of McKenzieRichey barn showing shed design, rolled roofing and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of McKenzie-Richey barn showing shed design, rolled roofing and wood shed roof, facing southwest - McKenzie Property, Barn, North Bank of Sailor Gulch, 750 feet northwest of intersection of U.S.F.S. Roads 651 & 349, Placerville, Boise County, ID

  2. 48 CFR 552.270-20 - Payment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., usable square footage delivered will be confirmed by either: (1) The Government's measurement of plans... of usable square footage stated in the lease. (c) If the amount of usable square footage delivered is... space delivered and the annual rental will be adjusted as follows: Usable square feet (USF) not...

  3. Long-term trends in fire behavior and changes in population at risk

    EPA Science Inventory

    Long-term trends in fire behavior and changes in population at risk Rappold AG, Peterson GC, US EPA Matt Jolly, USFS Air pollution regulations and technological advances have successfully reduced emissions of air pollutants from many anthropogenic sources in recent decades. Duri...

  4. Reciprocal Education Experiences In Two GK-12 Programs: Teachers Learning And Students Teaching In Diverse Settings

    NASA Astrophysics Data System (ADS)

    Mayo, M.; Williams, C.; Rodriguez, T.; Greely, T.; Pyrtle, A. J.; Rivera-Rentas, A. L.; Vilches, M.

    2004-12-01

    The National Science Foundation's Graduate Teaching Fellows in K-12 Education (GK-12) Program has enabled science, technology, engineering and mathematics (STEM) graduate schools across the country to become more active in local area K-12 schools. An overview of a graduate student's experiences, insights gained and lessons learned as a Fellow in the 2003-2004 Universidad Metropolitana's (UMET) environmental science and the 2004-2005 University of South Florida's (USF) ocean science GK-12 Programs is presented. The major goals of the 2003-2004 UMET GK-12 Program were 1) to enrich environmental science teaching and learning via a thematic approach in eight local public schools and 2) to provide UMET graduate students with exposure to teaching methodologies and practical teaching experience. Utilizing examples from local environments in and nearby Carolina, Puerto Rico to teach key science principles at Escuela de la Comunidad Juana Rodriguez Mundo provided numerous opportunities to relate science topics to students' daily life experiences. By 2004, the UMET GK-12 Program had successfully engaged the entire student body (primarily comprised of bilingual minority kindergarten to sixth graders), teachers and school administrators in environment-focused teaching and learning activities. Examples of such activities include tree planting projects to minimize local erosion, conducting a science fair for the first time in many years, and numerous opportunities to experience what "real scientists do" while conducting environmental science investigations. During the 2004-2005 academic year, skills, insights and lessons learned as a UMET GK-12 Fellow are being further enhanced through participation in the USF GK-12 OCEANS Program. The overall objectives of the 2004-2005 USF GK-12 OCEANS assignment at Madeira Beach Elementary School in Saint Petersburg, Florida are to 1) engage students from various ethnic backgrounds and cultures in hands-on science activities, 2) enhance the school's third grade ocean science education curriculum, and 3) foster dialog between students at Madeira Beach Elementary School and Escuela de la Comunidad Juana Rodriguez Mundo, via exchange of pictures, video recordings, letters and emails related to environment-focused learning activities being undertaken at the two schools. In addition to these objectives, during the 2004-2005 academic year several ocean science-focused activities, the majority of which were adapted and/or identified from either the UMET GK-12 or USF OCEAN GK-12 Programs, will be utilized to further stimulate Madeira Beach Elementary School third graders' critical thinking skills. Examples of such activities, including hands-on exercises, case studies, games and field trips are highlighted in this presentation.

  5. Emotional intelligence assessment in a graduate entry medical school curriculum.

    PubMed

    Doherty, Eva M; Cronin, Patricia A; Offiah, Gozie

    2013-03-07

    The management of emotions in the workplace is a skill related to the ability to demonstrate empathic behaviour towards patients; to manage emotional reactions in oneself and to lead others as part of a team. This ability has been defined as emotional intelligence (EI) and doctor's EI may be related to communication skills and to patient satisfaction levels. This study reports on the use of two assessments of EI as part of a course on Personal and Professional Development (PPD) in a graduate medical school curriculum. Fifty one graduate entry medical students completed an eight session course on PPD between December 2005 and January 2006. Students completed two measures of EI: self-report (EQ-i) and ability (MSCEIT V2.0) over a two year study period. The data gathered were used to explore the relationship between self-report and ability EI and between EI and student demographics, academic performance and change over time. Analysis of the EI data demonstrated that self-report EI did not change over time and was not related to ability EI. Females scored higher than males on a number of self-report and ability EI scores. Self-reported self-awareness was found to deteriorate in males and females over time. High self-reported EI was found to be associated with poor performance on clinical competency assessments but with good performance on a number of bio-medical knowledge based assessments. This report concludes that assessments of EI can be incorporated into a medical school curriculum as part of a PPD programme and that the concept of EI may be associated with performance in medical school.

  6. 24 CFR 50.24 - HUD review of another agency's EIS.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false HUD review of another agency's EIS... Review Procedures § 50.24 HUD review of another agency's EIS. Where another agency's EIS is referred to... Officer shall determine whether HUD has an interest in the EIS and, if so, will review and comment. Any...

  7. 36 CFR 1010.9 - Preparation of an EIS.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Preparation of an EIS. 1010.9... Preparation of an EIS. (a) Notice of intent. When the Trust decides to prepare an EIS, it shall publish a... lengthy period between the Trust's decision to prepare an EIS and the time of actual preparation, then at...

  8. The role of trait and ability emotional intelligence in bulimic symptoms.

    PubMed

    Gardner, Kathryn Jane; Quinton, Stephanie; Qualter, Pamela

    2014-04-01

    Bulimia is characterized by poor affect regulation, yet the role of emotional intelligence (EI) is little understood. This study examined associations between EI and bulimic symptoms using 235 women from community and student populations. They completed measures of trait and ability EI, and the Eating Disorders Diagnostic Scale. Results showed that deficiencies in different aspects of trait EI and/or ability EI are a function of symptom type: binge eating, compensatory behaviours or weight and shape concerns. Consistent with affect regulation models, self-regulatory aspects of trait EI were related to two bulimic symptoms: binge eating and weight and shape concerns. Ability-based self-emotion management was not important, and explanatory power of lower-level EI facets (traits or abilities) was not superior to more broadly defined EI factors. Results support the conclusion that trait and ability EI may maintain subclinical levels of bulimic symptoms but have different paths. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Validity evidence for the situational judgment test paradigm in emotional intelligence measurement.

    PubMed

    Libbrecht, Nele; Lievens, Filip

    2012-01-01

    To date, various measurement approaches have been proposed to assess emotional intelligence (EI). Recently, two new EI tests have been developed based on the situational judgment test (SJT) paradigm: the Situational Test of Emotional Understanding (STEU) and the Situational Test of Emotion Management (STEM). Initial attempts have been made to examine the construct-related validity of these new tests; we extend these findings by placing the tests in a broad nomological network. To this end, 850 undergraduate students completed a personality inventory, a cognitive ability test, a self-report EI test, a performance-based EI measure, the STEU, and the STEM. The SJT-based EI tests were not strongly correlated with personality and fluid cognitive ability. Regarding their relation with existing EI measures, the tests did not capture the same construct as self-report EI measures, but corresponded rather to performance-based EI measures. Overall, these results lend support for the SJT paradigm for measuring EI as an ability.

  10. Leukotrienes-mediated effects of water extracts from Sargassum horneri, a marine brown alga, on Cl- absorption in isolated rat colon.

    PubMed

    Sakai, Hideki; Uchiumi, Takaoki; Lee, Jung-Bum; Ohira, Yuta; Ohkura, Jun-ichi; Suzuki, Tomoyuki; Hayashi, Toshimitsu; Takeguchi, Noriaki

    2004-02-01

    Sargassum horneri is an edible marine brown alga distributed along the seacoast of Japan. Here we examined effects on the water-soluble (ethanol-insoluble) extracts (EIS) from Sargassum horneri on ion transports across the isolated rat colonic mucosa set in Ussing chambers. The nonpolysaccharide fraction of EIS (EIS-2) significantly decreased short-circuit current (Isc) across the mucosa, and increased the tissue conductance (Gt). The half-maximal effect of EIS-2 was obtained at 20 microg/ml. In contrast, the polysaccharide fraction of EIS (EIS-1; 100 microg/ml) had little effect on Isc and Gt. The effect of EIS-2 depended on the presence of Cl- and HCO3- but not K+ in the bathing solution. These results suggest that EIS-2 stimulates Cl)absorption in the colonic mucosa. The EIS-2-induced changes in Isc and Gt were inhibited by 3-(1-[p-chlorobenzyl]-5-[isopropyl]-3-t-butylthioindol-2-yl)-2,2-dimethyl-propanoic acid sodium (MK-886; 10 microM), a 5-lipoxygenase-activating protein inhibitor, and 5-nitro-2-(3-phenylpropylamino)-benzoate (NPPB; 100 microM), a Cl- channel blocker. EIS-2 attenuated the prostaglandin E2 (0.5 microM)-increased Isc, and the half-maximal effect of EIS-2 was obtained at 50 microg/ml. The present study suggests that the EIS-2 stimulates Cl- absorption mediated by basolateral leukotriene-sensitive Cl- channels and apical Cl-/HCO3- exchanger in the rat colonic mucosa.

  11. Emotional intelligence is a protective factor for suicidal behavior.

    PubMed

    Cha, Christine; Nock, Matthew

    2009-04-01

    Little is known about what factors protect against the occurrence of suicidal ideation and attempts. We tested whether emotional intelligence (EI)-the ability to perceive, integrate into thoughts, understand, and manage one's emotions-decreases the likelihood of suicidal ideation and attempts among those at risk. Adolescents (N = 54) aged 12 to 19 years were recruited from local psychiatric clinics and the community to participate in this cross-sectional laboratory-based study. Analyses examined whether the relations between childhood sexual abuse and suicidal ideation and attempts were moderated by adolescents' EI. These constructs were assessed using self-report, structured interviews, and performance-based tests, respectively. Analyses revealed that EI is a protective factor for both suicidal ideation and attempts. Specifically, childhood sexual abuse was strongly predictive of these outcomes among those with low EI, weakly predictive among those with medium EI, and completely unrelated among those with high EI. Follow-up analyses revealed that the protective effect of EI was driven primarily by differences in strategic EI (i.e., ability to understand and manage emotions) but not experiential EI (i.e., ability to perceive emotions and integrate emotions into thoughts). This study provides preliminary evidence that EI is a protective factor for suicidal ideation and attempts. Important next steps include testing the moderating influence of EI on a wider range of stressful life events and self-injurious behaviors, as well as conducting experimental studies to determine whether enhancing EI decreases the subsequent occurrence of these behavior problems.

  12. 24 CFR 58.55 - Notice of intent to prepare an EIS.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Notice of intent to prepare an EIS... Statements § 58.55 Notice of intent to prepare an EIS. As soon as practicable after the responsible entity decides to prepare an EIS, it must publish a NOI/EIS, using the HUD recommended format and disseminate it...

  13. Systematic literature review shows that appetite rating does not predict energy intake.

    PubMed

    Holt, Guy M; Owen, Lauren J; Till, Sophie; Cheng, Yanying; Grant, Vicky A; Harden, Charlotte J; Corfe, Bernard M

    2017-11-02

    Ratings of appetite are commonly used to assess appetite modification following an intervention. Subjectively rated appetite is a widely employed proxy measure for energy intake (EI), measurement of which requires greater time and resources. However, the validity of appetite as a reliable predictor of EI has not yet been reviewed systematically. This literature search identified studies that quantified both appetite ratings and EI. Outcomes were predefined as: (1) agreement between self-reported appetite scores and EI; (2) no agreement between self-reported appetitescores and EI. The presence of direct statistical comparison between the endpoints, intervention type and study population were also recorded. 462 papers were included in this review. Appetite scores failed to correspond with EI in 51.3% of the total studies. Only 6% of all studies evaluated here reported a direct statistical comparison between appetite scores and EI. χ 2 analysis demonstrated that any relationship between EI and appetite was independent of study type stratification by age, gender or sample size. The very substantive corpus reviewed allows us to conclude that self-reported appetite ratings of appetite do not reliably predict EI. Caution should be exercised when drawing conclusions based from self-reported appetite scores in relation to prospective EI.

  14. Effects of compression force on elasticity index and elasticity ratio in ultrasound elastography

    PubMed Central

    Sasaki, Y; Sakamoto, J; Kamio, T; Nishikawa, K; Otonari-Yamamoto, M; Wako, M

    2014-01-01

    Objectives: The purpose of this study was to investigate the relationship between compression force and hardness values in ultrasound elastography. Methods: Ultrasound elastography was performed using an elastography phantom, comprising inclusions with different elasticities and echogenicities. The compression force was set to approximately 100 gw (light force) and approximately 500 gw (heavy force). The elasticity index (EI) of the inclusion was measured. The EI was a relative hardness value of a structure within an elastographic image. Similarly, the EI of the background was measured as a reference. The elasticity ratio (ER) was calculated as the EI of the inclusion divided by the EI of the reference. Results: The hardness of the phantom could be discerned with both the EI and ER, regardless of the compression force. The EI and ER with heavy force tended to be higher than those with light force, but the difference was not significant. A strong correlation was observed between the EI and ER of soft structures, whereas the correlation between the EI and ER of hard structures was weak, and the ER values varied widely. Conclusions: The EI offers potential as a good indicator for assessing the hardness. PMID:24592929

  15. An Epoxyisoprostane is a Major Regulator of Endothelial Cell Function

    PubMed Central

    Zhong, Wei; Springstead, James R.; Al-Mubarak, Ramea; Lee, Sangderk; Li, Rongsong; Emert, Benjamin; Berliner, Judith A.; Jung, Michael E.

    2014-01-01

    The goal of these studies was to determine the effect of 5,6-epoxyisoprostane, EI, on human aortic endothelial cells (HAEC). EI can form as a phospholipase product of 1-palmitoyl-2-(5,6-epoxyisoprostane E2)-sn-glycero-3-phosphocholine, PEIPC, a pro-inflammatory molecule that accumulates in sites of inflammation where phospholipases are also increased. To determine the effect of EI on HAEC, we synthesized several stereoisomers of EI using a convergent approach from the individual optically pure building blocks, the epoxyaldehydes 5 and 6 and the bromoenones 14 and 16. The desired stereoisomer of EI can be prepared from these materials in only six operations and thus large amounts of the product can be obtained. The trans/trans isomers had the most potent activity, suggesting specificity in the interaction of EI with the cell surface. EI has potent anti-inflammatory effects in HAEC. EI strongly inhibits the production of MCP-1, a major monocyte chemotactic factor, and either decreases or minimally increases the levels of ten pro-inflammatory molecules increased by PEIPC. EI also strongly downregulates the inflammatory effects of IL-1β, a major inflammatory cytokine. Thus EI, a hydrolytic product of PEIPC, has potent anti-inflammatory function. PMID:24117045

  16. Diet misreporting can be corrected: confirmation of the association between energy intake and fat-free mass in adolescents.

    PubMed

    Vainik, Uku; Konstabel, Kenn; Lätt, Evelin; Mäestu, Jarek; Purge, Priit; Jürimäe, Jaak

    2016-10-01

    Subjective energy intake (sEI) is often misreported, providing unreliable estimates of energy consumed. Therefore, relating sEI data to health outcomes is difficult. Recently, Börnhorst et al. compared various methods to correct sEI-based energy intake estimates. They criticised approaches that categorise participants as under-reporters, plausible reporters and over-reporters based on the sEI:total energy expenditure (TEE) ratio, and thereafter use these categories as statistical covariates or exclusion criteria. Instead, they recommended using external predictors of sEI misreporting as statistical covariates. We sought to confirm and extend these findings. Using a sample of 190 adolescent boys (mean age=14), we demonstrated that dual-energy X-ray absorptiometry-measured fat-free mass is strongly associated with objective energy intake data (onsite weighted breakfast), but the association with sEI (previous 3-d dietary interview) is weak. Comparing sEI with TEE revealed that sEI was mostly under-reported (74 %). Interestingly, statistically controlling for dietary reporting groups or restricting samples to plausible reporters created a stronger-than-expected association between fat-free mass and sEI. However, the association was an artifact caused by selection bias - that is, data re-sampling and simulations showed that these methods overestimated the effect size because fat-free mass was related to sEI both directly and indirectly via TEE. A more realistic association between sEI and fat-free mass was obtained when the model included common predictors of misreporting (e.g. BMI, restraint). To conclude, restricting sEI data only to plausible reporters can cause selection bias and inflated associations in later analyses. Therefore, we further support statistically correcting sEI data in nutritional analyses. The script for running simulations is provided.

  17. Emotional intelligence assessment in a graduate entry medical school curriculum

    PubMed Central

    2013-01-01

    Background The management of emotions in the workplace is a skill related to the ability to demonstrate empathic behaviour towards patients; to manage emotional reactions in oneself and to lead others as part of a team. This ability has been defined as emotional intelligence (EI) and doctor’s EI may be related to communication skills and to patient satisfaction levels. This study reports on the use of two assessments of EI as part of a course on Personal and Professional Development (PPD) in a graduate medical school curriculum. Methods Fifty one graduate entry medical students completed an eight session course on PPD between December 2005 and January 2006. Students completed two measures of EI: self-report (EQ-i) and ability (MSCEIT V2.0) over a two year study period. The data gathered were used to explore the relationship between self-report and ability EI and between EI and student demographics, academic performance and change over time. Results Analysis of the EI data demonstrated that self-report EI did not change over time and was not related to ability EI. Females scored higher than males on a number of self-report and ability EI scores. Self-reported self-awareness was found to deteriorate in males and females over time. High self-reported EI was found to be associated with poor performance on clinical competency assessments but with good performance on a number of bio-medical knowledge based assessments. Conclusions This report concludes that assessments of EI can be incorporated into a medical school curriculum as part of a PPD programme and that the concept of EI may be associated with performance in medical school. PMID:23497237

  18. 77 FR 3265 - Information Collection Being Reviewed by the Federal Communications Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of... of a currently approved collection. Respondents: Business or other for-profit entities. Number of... previous burden estimates. On November 18, 2011, the Commission adopted the USF/ICC Transformation Order...

  19. Coweeta (CWT) [USFS, LTER

    Treesearch

    Chelcy Miniat

    2013-01-01

    The EcoTrends Editorial Committee sorted through vase amounts of historical and ongoing data from 50 ecological sites in the continental United States including Alaska, several islands, and Antarctica to present in a logical format the variables commonly collected. This report presents a subset of data and variables from these sites and illustrates through detailed...

  20. Collaboration in Action: Office of Research and Development (ORD) at the US Environmental Protection Agency (USEPA)-Current Wildfire Program

    EPA Science Inventory

    The "Collaboration in Action: US EPA's Office of Research and Develop - Current Wildfire Research Program" was invited by the USDA's US Forest Service's Scientific Executive Committee to provide USFS scientific leadership active and potential future opportunities for co...

Top