Science.gov

Sample records for draft implementation plan

  1. 76 FR 47271 - Implementation of Scientific Integrity Principles: Draft Plan for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... public relations activities. A principal goal of public affairs is to help NSF most efficiently achieve... Implementation of Scientific Integrity Principles: Draft Plan for Public Comment AGENCY: National Science...: Draft Plan for Public Comment. SUMMARY: On March 9, 2009, President Obama issued a Memorandum for...

  2. 77 FR 2514 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... QUALITY National Ocean Council--National Ocean Policy Draft Implementation Plan AGENCY: Council on..., President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (National Ocean Policy). As part of the President's charge for Federal...

  3. 77 FR 15052 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Federal Government will take to improve the health of the ocean, coasts, and Great Lakes, which support tens of millions of jobs, ] contribute trillions of dollars a year to the national economy, and are essential to public health and national security. Next, public comments on the draft Implementation...

  4. 75 FR 43528 - Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... HUMAN SERVICES Office of the Secretary Seeking Public Comment on Draft National Health Security Strategy... achieve national health security and to implement the first quadrennial National Health Security Strategy... the National Health Security Strategy of the United States of America (2009) the U.S. Government has...

  5. Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs. Draft revision

    SciTech Connect

    Peterson, G.L.

    1993-11-18

    Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS`s program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives.

  6. Draft Transportation Institutional Plan

    SciTech Connect

    Not Available

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab.

  7. 78 FR 39253 - Notice of Extension of Comment Period for Draft Initial Comprehensive Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ...] Notice of Extension of Comment Period for Draft Initial Comprehensive Plan and Draft Environmental... Public Comment Period. SUMMARY: Pursuant to the Resources and Ecosystems Sustainability, Tourist... region and the Draft Programmatic Environmental Assessment (Draft PEA) for the Draft Plan....

  8. 76 FR 5203 - Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Environmental Impact Statement (Plan/DEIS). The Plan/DEIS evaluates four alternatives for sustainable management of NPS facilities (e.g. roads, maintenance yard, trails, bridges) in response to flooding and...

  9. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    SciTech Connect

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support

  10. Business Plan in Brief : Draft.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  11. Draft Mission Plan Amendment

    SciTech Connect

    1991-09-01

    The Department of Energy`s Office Civilian Radioactive Waste Management has prepared this document to report plans for the Civilian Radioactive Waste Management Program, whose mission is to manage and dispose of the nation`s spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and of workers and the quality of the environment. The Congress established this program through the Nuclear Waste Policy Act of 1982. Specifically, the Congress directed us to isolate these wastes in geologic repositories constructed in suitable rock formations deep beneath the surface of the earth. In the Nuclear Waste Policy Amendments Act of 1987, the Congress mandated that only one repository was to be developed at present and that only the Yucca Mountain candidate site in Nevada was to be characterized at this time. The Amendments Act also authorized the construction of a facility for monitored retrievable storage (MRS) and established the Office of the Nuclear Waste Negotiator and the Nuclear Waste Technical Review Board. After a reassessment in 1989, the Secretary of Energy restructured the program, focusing the repository effort scientific evaluations of the Yucca Mountain candidate site, deciding to proceed with the development of an MRS facility, and strengthening the management of the program. 48 refs., 32 figs.

  12. 76 FR 50490 - Draft Comprehensive Conservation Plan and Draft Environmental Impact Statement, Arctic National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... Fish and Wildlife Service Draft Comprehensive Conservation Plan and Draft Environmental Impact... conservation plan (CCP) and draft environmental impact statement (DEIS) for the Arctic National Wildlife Refuge... Refuge System, consistent with sound principles of fish and wildlife management, conservation, legal...

  13. Final Draft Strategic Marketing Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-02-01

    The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

  14. Draft Maumee River Watershed Restoration Plan

    EPA Pesticide Factsheets

    A draft of the Maumee River AOC Watershed Restoration Plan was completed in January 2006. The plan was created to meet requirements for the stage II RAP as well as Ohio EPA’s and ODNR’s Watershed Coordinator Program.

  15. 61 FR 57891 - Amendment To Extend Public Comment Period on Draft Resource Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    1996-11-08

    ... Notice of Availability was published in the Federal Register for the draft Owyhee Resource Management... public comment period for the draft Owyhee Resource Management Plan and draft Environmental Impact... sent to: Owyhee Area Manager, Bureau of Land Management, Boise Field Office, 3948 Development...

  16. 76 FR 51394 - DRAFT General Management Plan and Draft Environmental Impact Statement, Biscayne National Park, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... National Park Service DRAFT General Management Plan and Draft Environmental Impact Statement, Biscayne National Park, FL AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft... Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the...

  17. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION: Notice; second correction..., concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal Year 2012 Work Plan is to provide clarifying edits. In particular, Section 304(b)(3) of the Denali...

  18. Cottonwood Management Plan / Draft Programmatic Environmental Assessment. Proposed Implementation of a Cottonwood Management Plan Along Six Priority Segments of the Missouri River

    DTIC Science & Technology

    2010-02-01

    Conifers; Volume 2. Hardwoods. Agriculture Handbook 654. U.S. Department of Agriculture (USDA), Forest Service, Washington, DC. vol.2, 877 p...Nebraska. Prairie Nat. 15(4):145-154 [from Corps 2004a]. Federal Emergency Management Agency (FEMA). 1998. Property Acquisition Handbook for Local...Planning and Decision Making. Edited by Davis, W. S., and T. P. Simon, pp. 31-47. CRC Press, Boca Raton, Florida. Inglis, G. J., H. Hurren, J

  19. 77 FR 61017 - Draft Habitat Conservation Plan and Application for an Incidental Take Permit, Yamhill County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Fish and Wildlife Service Draft Habitat Conservation Plan and Application for an Incidental Take Permit... county road maintenance and prairie habitat management activities. The application includes the County's draft habitat conservation plan (HCP), which describes the actions the County will implement to minimize...

  20. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  1. 77 FR 5528 - Trust Land Consolidation Draft Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... Office of the Secretary Trust Land Consolidation Draft Plan AGENCY: Office of the Secretary, Interior... land consolidation fund to be used for consolidating Indian trust and restricted lands and acquiring fractional interests in these lands. We are seeking comments on the draft plan for accomplishing these goals...

  2. 76 FR 62087 - Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Lizard, Texas AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability; announcement... application includes the draft Texas Conservation Plan for the Dunes Sagebrush Lizard (TCP). The draft TCP... Service (Service) and the Applicant for the dunes sagebrush lizard (Sceloporus arenicolus) throughout its...

  3. 76 FR 65744 - Draft Environmental Assessment and Draft Habitat Conservation Plan for Lower Colorado River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Service, Interior. ACTION: Notice of availability of documents and announcement of public hearings... Director, U.S. Fish and Wildlife Service, P.O. Box 1306, Room 6034, Albuquerque, NM 87103. Public... Fish and Wildlife Service Draft Environmental Assessment and Draft Habitat Conservation Plan for...

  4. 76 FR 41808 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Fish and Wildlife Service Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery Facilities in 100 Texas Counties AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of documents and announcement of public hearings. SUMMARY: We, the...

  5. 77 FR 42756 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Incidental Take of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Texas troglobitic water slater (Lirceolus smithii) in case they are listed during the duration of the..., and the Edwards Aquifer Authority; San Antonio Water Systems; City of New Braunfels, Texas; City of... Fish and Wildlife Service Draft Environmental Impact Statement and Draft Habitat Conservation Plan...

  6. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  7. Environmental protection Implementation Plan

    SciTech Connect

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  8. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  9. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  10. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  11. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Astrophysics Data System (ADS)

    1991-03-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  12. 78 FR 70571 - Notice of Availability of the Oregon Greater Sage-Grouse Draft Land Use Plan Amendments and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... and Assessment Strategy (2011), which includes an emphasis on protecting Core Areas with no... Service's National Greater Sage-Grouse Planning Strategy. The Draft LUP Amendments/Draft EIS propose to...

  13. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice. SUMMARY: The Denali Commission....C. 3121). The Denali Commission Act requires that the Commission develop proposed work plans for future spending and that the annual Work Plan be published in the Federal Register, providing an...

  14. Strategic implementation plan

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  15. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... National Park Service Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement... Availability of the Draft Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan... Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan for Biscayne National Park,...

  16. 78 FR 56271 - FY 2014-2020 Draft VA Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-12

    ... AFFAIRS FY 2014-2020 Draft VA Strategic Plan AGENCY: Department of Veterans Affairs. ACTION: Notice of... availability of the FY 2014-2020 Draft VA Strategic Plan (Strategic Plan) for public review and comment, as.... Comments should indicate that they are submitted in response to the ``FY 2014-2020 Draft VA Strategic Plan...

  17. 12 CFR 516.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable...

  18. 12 CFR 516.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable...

  19. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  20. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  1. 76 FR 59732 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... Oncor Electric Delivery Facilities in 100 Texas Counties AGENCY: Fish and Wildlife Service, Interior... draft Oncor Electric Delivery Company, LLC, habitat conservation plan (HCP). Due to an inadvertent error... least 2 weeks prior to each meeting. FOR FURTHER INFORMATION CONTACT: Mr. Adam Zerrenner, Field...

  2. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... National Park Service Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park....

  3. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... National Park Service Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National... comment period for Draft Environmental Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and...

  4. 76 FR 79708 - Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... National Park Service Draft Environmental Impact Statement/General Management Plan, Golden Gate National... for Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft General Management Plan and Environmental Impact...

  5. 77 FR 47435 - Prime Hook National Wildlife Refuge, Sussex County, DE; Draft Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... Fish and Wildlife Service Prime Hook National Wildlife Refuge, Sussex County, DE; Draft Comprehensive... conservation plan and draft environmental impact statement (draft CCP/EIS) for Prime Hook National Wildlife... ``Prime Hook NWR Draft CCP'' in the subject line of the message. Fax: Attention: Thomas Bonetti, 413-253...

  6. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  7. 77 FR 11116 - Draft National Plan To Address Alzheimer's Disease

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    .... Accelerate the development of treatments that would prevent, halt, or reverse the course of Alzheimer's disease. Improve early diagnosis and coordination of care and treatment of Alzheimer's disease. Improve... HUMAN SERVICES Draft National Plan To Address Alzheimer's Disease AGENCY: Office of the...

  8. 77 FR 17091 - Trust Land Consolidation Draft Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... Office of the Secretary Trust Land Consolidation Draft Plan AGENCY: Office of the Secretary, Interior... Agreement established a trust land consolidation fund to be used for consolidating Indian trust and restricted lands and acquiring fractional interests in these lands. We are reopening the period for...

  9. Practical issues in implementation of WMA's draft Declaration of Helsinki.

    PubMed

    Shah, Pankaj

    2014-01-01

    The working group of the World Medical Association (WMA) has published a revised draft of the Declaration of Helsinki for public consultation till June 15, 2013. There are many positive changes in the document with respect to compensation, education of investigators, informed consent in the case of stored samples, etc. The changes represent a step forward for ethics. However, there may be certain points of concern regarding the implementation of the Declaration.

  10. Draft Plan for Development of the Integrated Science ...

    EPA Pesticide Factsheets

    EPA has announced a draft development plan for the next Integrated Science Assessment (ISA) for the health effects of nitrogen oxides (NOX) which will serve as the scientific basis for review of the primary (health-based) National Ambient Air Quality Standard for nitrogen dioxide. The ISA is intended to provide a comprehensive assessment of the current scientific literature pertaining to known and anticipated effects on public health associated with the NOX in the ambient air. The Preamble that has been included in previous ISAs is provided here as a resource for review of the ISA development plan, since it describes the general processes for ISA development. The purpose of this draft document is to communicate the plan for the development of the Integrated Science Assessment (ISA) for the health effects of nitrogen oxides (NOX), which will provide a comprehensive assessment of the current scientific literature pertaining to known and anticipated effects on public health associated with the NOX in the ambient air.

  11. 77 FR 61426 - Rose Atoll National Wildlife Refuge, American Samoa; Draft Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-09

    ... Fish and Wildlife Service Rose Atoll National Wildlife Refuge, American Samoa; Draft Comprehensive... Assessment (Draft CCP/EA) for the Rose Atoll National Wildlife Refuge (NWR/refuge) for public review and.../planning.html . Email: FW1PlanningComments@fws.gov . Include ``Rose Atoll National Wildlife Refuge Draft...

  12. 76 FR 44604 - Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... National Park Service Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental... (NPS) announces the availability of the Draft Anacostia Park Wetland and Resident Canada Goose... draft Plan/DEIS evaluates the impacts of several management alternatives that address managing wetlands...

  13. TRUPACT-1 implementation plan

    SciTech Connect

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  14. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... National Park Service Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida AGENCY: National Park Service, Interior. ACTION: Notice of Availability. SUMMARY... National Park Service (NPS) announces the availability of the Draft Environmental Impact Statement...

  15. Review of the Draft 2014 Science Mission Directorate Science Plan

    NASA Technical Reports Server (NTRS)

    2013-01-01

    At the request of NASA's Science Mission Directorate (SMD), the National Research Council's (NRC's) Space Studies Board (SSB) initiated a study to review a draft of the SMD's 2014 Science Plan. The request for this review was made at a time when NASA is engaged in the final stages of a comprehensive, agency-wide effort to develop a new strategic plan and at a time when NASA's budget is under considerable stress. SMD's Science Plan serves to provide more detail on its four traditional science disciplines-astronomy and astrophysics, solar and space physics (also called heliophysics), planetary science, and Earth remote sensing and related activities-than is possible in the agency-wide Strategic Plan. In conducting its review of the draft Science Plan, the Committee on the Assessment of the NASA Science Mission Directorate 2014 Science Plan was charged to comment on the following specific areas: (1) Responsiveness to the NRC's guidance on key science issues and opportunities in recent NRC reports; (2) Attention to interdisciplinary aspects and overall scientific balance; (3) Identification and exposition of important opportunities for partnerships as well as education and public outreach; (4) Integration of technology development with the science program; (5) Clarity on how the plan aligns with SMD's strategic planning process; (6) General readability and clarity of presentation; and (7) Other relevant issues as determined by the committee. The main body of the report provides detailed findings and recommendations relating to the draft Science Plan. The highest-level, crosscutting issues are summarized here, and more detail is available in the main body of the report.

  16. Review of the Draft 2014 Science Mission Directorate Science Plan

    NASA Technical Reports Server (NTRS)

    2013-01-01

    At the request of NASA's Science Mission Directorate (SMD), the National Research Council's (NRC's) Space Studies Board (SSB) initiated a study to review a draft of the SMD's 2014 Science Plan. The request for this review was made at a time when NASA is engaged in the final stages of a comprehensive, agency-wide effort to develop a new strategic plan and at a time when NASA's budget is under considerable stress. SMD's Science Plan serves to provide more detail on its four traditional science disciplines-astronomy and astrophysics, solar and space physics (also called heliophysics), planetary science, and Earth remote sensing and related activities-than is possible in the agency-wide Strategic Plan. In conducting its review of the draft Science Plan, the Committee on the Assessment of the NASA Science Mission Directorate 2014 Science Plan was charged to comment on the following specific areas: (1) Responsiveness to the NRC's guidance on key science issues and opportunities in recent NRC reports; (2) Attention to interdisciplinary aspects and overall scientific balance; (3) Identification and exposition of important opportunities for partnerships as well as education and public outreach; (4) Integration of technology development with the science program; (5) Clarity on how the plan aligns with SMD's strategic planning process; (6) General readability and clarity of presentation; and (7) Other relevant issues as determined by the committee. The main body of the report provides detailed findings and recommendations relating to the draft Science Plan. The highest-level, crosscutting issues are summarized here, and more detail is available in the main body of the report.

  17. 78 FR 73555 - Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early Restoration Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... the Deepwater Horizon Oil Spill (Framework Agreement), the Trustees have previously selected, and BP... Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early Restoration Plan and Draft Early... as a result of the Deepwater Horizon oil spill. The restoration alternatives are comprised of early...

  18. Draft of the PHENIX Management Plan

    SciTech Connect

    Not Available

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  19. Draft Automatic Data Acquisition System Plan

    SciTech Connect

    Not Available

    1987-04-01

    This Automatic Data Acquisition System (ADAS) Plan has been prepared in support of the requirement for detailed site characterization of the Deaf Smith County candidate repository site in salt, and describes the data acquisition system which will be used for unattended data collection from the geotechnical instrumentation installed at the site. Section 1.1 discusses the programmatic background to the plan, Section 1.2 presents the scope and purpose of the plan, and the organization of the document is given in Section 1.3. 31 refs., 34 figs., 8 tabs.

  20. 78 FR 46598 - Notice of Availability of the Draft Rob Jaggers Camping Area Business Plan and Expanded Amenity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... Bureau of Land Management Notice of Availability of the Draft Rob Jaggers Camping Area Business Plan and... prepared and is making available to the public the Draft Rob Jaggers Camping Area Business Plan and... written comments on the Draft Business Plan by December 15, 2013. ADDRESSES: Copies of the Draft...

  1. Conduct of operations implementation plan

    SciTech Connect

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  2. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  3. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    SciTech Connect

    Lim, E. Y.; Miller, W. J.; Parkinson, W. J.; Ritzman, R. L.; vonHerrmann, J. L.; Wood, P. J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix.

  4. 76 FR 16634 - Seal Beach National Wildlife Refuge, Orange County, CA; Draft Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... plans (an Integrated Pest Management Program and a Mosquito Management Plan), as well as draft... mosquito monitoring and control would be guided by a Mosquito Management Plan. No changes to the current...

  5. 78 FR 26616 - Draft NOAA Five Year Research and Development Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... NOAA Five Year Research and Development Plan AGENCY: National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Draft NOAA Five Year Research and Development Plan for Public Review. SUMMARY: NOAA's draft Five Year Research and Development Plan is available for...

  6. Draft Site Management and Monitoring Plan, Mississippi River, Southwest Pass, Louisiana

    EPA Pesticide Factsheets

    Joint Public Notice and Notice of Availability for Draft Mississippi River, Southwest Pass, Louisiana Site Management and Monitoring Plan for the Maintenance Dredging Ocean Dredged Material Disposal Site

  7. DWPF waste form compliance plan (Draft Revision)

    SciTech Connect

    Plodinec, M.J.; Marra, S.L.

    1991-12-31

    The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970`s, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

  8. DWPF waste form compliance plan (Draft Revision)

    SciTech Connect

    Plodinec, M.J.; Marra, S.L.

    1991-01-01

    The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970's, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

  9. Draft Strategic Laboratory Missions Plan. Volume II

    SciTech Connect

    1996-03-01

    This volume described in detail the Department`s research and technology development activities and their funding at the Department`s laboratories. It includes 166 Mission Activity Profiles, organized by major mission area, with each representing a discrete budget function called a Budget and Reporting (B & R) Code. The activities profiled here encompass the total research and technology development funding of the laboratories from the Department. Each profile includes a description of the activity and shows how the funding for that activity is distributed among the DOE laboratories as well as universities and industry. The profiles also indicate the principal laboratories for each activity, as well as which other laboratories are involved. The information in this volume is at the core of the Strategic Laboratory Mission Plan. It enables a reader to follow funds from the Department`s appropriation to a specific activity description and to specific R & D performing institutions. This information will enable the Department, along with the Laboratory Operations Board and Congress, to review the distribution of R & D performers chosen to execute the Department`s missions.

  10. Draft safety review plan for accelerator production of tritium (APT) project

    SciTech Connect

    1997-07-01

    The purpose of this ``living`` Safety Review Plan (SRP) is to describe the products and processes that will be followed to conduct a systematic review of the Accelerator Production of Tritium (APT) Facility Preliminary Safety Analysis Report (PSAR), and subsequently to prepare a draft Safety Evaluation Report (SER) on the PSAR. This plan is prepared for and will be implemented by the APT Independent Safety Review Committee (ISRC) over the period July 1, 1997 through September 30, 1998, in accordance with provisions established in DOE-STD-1104-96. A core team of DOE, INEEL, and AMPARO Corporation engineers and scientists will prepare the initial draft SER with assistance from other ISRC team members on an as needed basis. Guidelines for preparing the draft SER are presented in Section 7 of this SRP. The PSAR reviews will focus exclusively on safety. The ever-present two-part question will be: Does the subject matter have safety significance? If so, does the APT structural, system, component, and/or process engineering design ensure an acceptable margin of safety? The APT mission, efficiency, and cost are not considerations of this plan. A more detailed discussion of the review philosophy is presented in Section 5 of this SRP.

  11. Environmental implementation plan

    SciTech Connect

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  12. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  13. Puget Sound area electric reliability plan. Draft environmental impact statement

    SciTech Connect

    Not Available

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  14. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    SciTech Connect

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs.

  15. 78 FR 68469 - Draft General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ... National Park Service Draft General Management Plan/Wilderness Study/Environmental Impact Statement... availability of a Draft General Management Plan (GMP)/Wilderness Study/Environmental Impact Statement (EIS) for... action alternative) reflects current management direction and serves as a baseline for comparison with...

  16. 77 FR 12323 - Draft Environmental Impact Statement for the General Management Plan, Buck Island Reef National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... National Park Service Draft Environmental Impact Statement for the General Management Plan, Buck Island... Availability of a Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Buck Island... alternatives for consideration, including a No-Action Alternative that continues current management policies...

  17. 76 FR 51395 - Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... National Park Service Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP... Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral National...-Action Alternative that continues current management policies and the NPS's preferred alternative. The...

  18. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ...The U.S. Nuclear Regulatory Commission (NRC) is announcing the availability of and requesting comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and strategic objective, which remain unchanged. The NRC's priority continues to be ensuring the......

  19. 75 FR 56131 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl (Strix occidentalis caurina) AGENCY: Fish and Wildlife Service, Interior... Service, announce the availability of the Draft Revised Recovery Plan for the Northern Spotted Owl (Strix...

  20. 75 FR 6696 - Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Fish and Wildlife Service Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central... draft recovery plan for Tidal Marsh Ecosystems of Northern and Central California for public review and... Marsh Ecosystems of Northern and Central California features five endangered species. The biology of...

  1. Operational Energy Strategy: Implementation Plan

    DTIC Science & Technology

    2012-03-01

    Operational Energy Strategy: Implementation Plan Department of Defense March 2012 2011 - 2012. Generated on...2012. Cost estimate generated on October 21, 2011 0816 RefID: 3-9BCEC11 Report Documentation Page Form ApprovedOMB No. 0704-0188 Public...the Marine Corps. While all activities in this Implementation Plan will begin over the next 12 months, each will generate outcomes over the near

  2. 77 FR 1717 - Notice of Availability; Draft Springfield Plateau Regional Restoration Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... Department of Natural Resources, have written a Draft Springfield Plateau Regional Restoration Plan and Environmental Assessment (Plan), which describes proposed alternatives for restoring injured natural...

  3. 78 FR 57875 - Notice of Availability of the Draft Southeast Missouri Ozarks Regional Restoration Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... Resource Damage Assessment and Restoration (NRDAR) regulations and NEPA regulations. DATES: Written... Restoration Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... Department of Natural Resources have written a Draft Southeast Missouri Regional Restoration Plan...

  4. Bow-corridor local integrated resource plan: Draft plan

    SciTech Connect

    Not Available

    1990-01-01

    This plan presents the Government of Alberta's resource management policy for public lands and resources within the Bow Corridor. Resource potentials and opportunities for development are identified to assist in the economic progress of the province. The plan includes identification of its purpose and scope and the context in which it is presented; and resource management objectives and guidelines for ecological and aesthetic resources, fisheries, forests, historical resources, minerals, range land, settlement, tourism/recreation, water and watersheds and wildlife.

  5. 76 FR 35009 - Draft Oil and Gas Management Plan/Environmental Impact Statement for Big South Fork National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... National Park Service Draft Oil and Gas Management Plan/Environmental Impact Statement for Big South Fork.... ACTION: Notice of Availability of a Draft Oil and Gas Management Plan/ Environmental Impact Statement for..., announces the availability of the draft oil and gas management plan/environmental impact statement (OGMP...

  6. 78 FR 67348 - Invitation for Public Comment on Draft Test Plan for the High Burnup Dry Storage Cask Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Invitation for Public Comment on Draft Test Plan for the High Burnup Dry Storage Cask Research and... notice of request for public comment on its draft test plan for the High Burnup Dry Storage Cask Research... of dry storage cask systems and experiments would be beneficial. A draft test plan for the...

  7. General preamble: Implementation of Title I Clean Air Act Amendments of 1990. Staff working draft

    SciTech Connect

    Not Available

    1991-06-07

    The purpose of the document is to provide guidance to assist States in preparing new State implementation plans pursuant to Title I of the 1990 Clean Air Act Amendments. The present document, a staff working draft version of the General Preamble for Title I, will provide the focus for the public meeting scheduled for June 25-26, 1991. In its final form the document will discuss all pollutants. Final staff work products for particulate matter, sulfur dioxide, and lead are included in the Appendices to the document. The Appendices will eventually be incorporated into the main text, as indicated by the Table of Contents. The EPA plans to publish the final document in the Federal Register in late 1991.

  8. Draft of the Martin Peña Initative Plan

    EPA Pesticide Factsheets

    This action plan is being developed so that EPA Region 2 can implement a strategy that focuses its programs and regulatory authorities in activities that comprehensively address the environmental issues affecting the Martin Pena communities.

  9. Draft Site Treatment Plan (DSTP), Volumes I and II

    SciTech Connect

    D`Amelio, J.

    1994-08-30

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilities is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.

  10. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  11. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  12. 77 FR 46518 - Draft Resource Management Plan/General Plan Draft Environmental Impact Statement/Revised Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR..., California AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The Bureau of... California Department of Parks and Recreation was given the responsibility to plan, design, construct...

  13. 78 FR 14791 - Notice of Issuance of Exposure Draft on Implementation Guidance on General Property, Plant, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ..., Plant, and Equipment Cost Accumulation, Assignment, and Allocation. The Exposure Draft is available on... ADVISORY BOARD Notice of Issuance of Exposure Draft on Implementation Guidance on General Property, Plant, and Equipment Cost Accumulation, Assignment, and Allocation AGENCY: Federal Accounting Standards...

  14. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    SciTech Connect

    1994-08-31

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  15. 77 FR 8885 - Draft Guidance for Industry on Biosimilars: Questions and Answers Regarding Implementation of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... HUMAN SERVICES Food and Drug Administration Draft Guidance for Industry on Biosimilars: Questions and Answers Regarding Implementation of the Biologics Price Competition and Innovation Act of 2009; Availability AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The Food and...

  16. 76 FR 55923 - Draft Guidance for Industry: Submission of Warning Plans for Cigarettes and Smokeless Tobacco...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... HUMAN SERVICES Food and Drug Administration Draft Guidance for Industry: Submission of Warning Plans for... Collection; Comment Request AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The Food and Drug Administration (FDA) is announcing the availability of a draft guidance for industry entitled...

  17. 75 FR 67149 - Request for Public Comment on the Draft 2010 National Nanotechnology Initiative Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ... TECHNOLOGY POLICY Request for Public Comment on the Draft 2010 National Nanotechnology Initiative Strategic... request comments from the public regarding the draft 2010 National Nanotechnology Initiative (NNI... Nanotechnology Initiative (NNI) Strategic Plan is the framework that underpins the nanotechnology work of the NNI...

  18. 75 FR 36435 - Notice of Availability of the Draft Winnemucca District Resource Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... (July 2004). The Draft RMP/Draft EIS includes strategies for protecting and preserving the biological... amendments (1999). The key issues raised during the planning process include landscape health, recreation..., including a no-action alternative, were developed in response to these key issues. The alternatives also...

  19. 78 FR 23948 - Endangered and Threatened Wildlife and Plants; Black-Footed Ferret Draft Recovery Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Black-Footed Ferret Draft... draft recovery plan for the black-footed ferret (Mustela nigripes). This species is federally listed as... available by request from the National Black-Footed Ferret Conservation Center, U.S. Fish and Wildlife...

  20. 76 FR 64327 - Office of Oceanic and Atmospheric Research Draft Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... National Oceanic and Atmospheric Administration (NOAA) Office of Oceanic and Atmospheric Research Draft... Administration NOAA), Department of Department of Commerce (DOC). ACTION: Notice of availability and request for..., November 11, 2011. ADDRESSES: Public comments must be submitted to OAR.Plan@noaa.gov . The draft...

  1. 77 FR 30319 - Draft Environmental Impact Statement for General Management Plan, Fort Pulaski National Monument, GA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... National Park Service Draft Environmental Impact Statement for General Management Plan, Fort Pulaski National Monument, GA AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft... National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces...

  2. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an implementation plan for HUD approval that addresses each project or activity proposed to be undertaken by the...

  3. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an implementation plan for HUD approval that addresses each project or activity proposed to be undertaken by the...

  4. 78 FR 65700 - Notice of Availability of the Utah Greater Sage-Grouse Draft Land Use Plan Amendments and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Bureau of Land Management Notice of Availability of the Utah Greater Sage-Grouse Draft Land Use Plan...) and U.S. Forest Service (USFS) have prepared a Utah Greater Sage-Grouse Draft Land Use Plan (LUP... related to the Utah Greater Sage-Grouse Draft LUP Amendments/EIS by any of the following methods: Email...

  5. 340 Facility maintenance implementation plan

    SciTech Connect

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  6. 77 FR 55222 - Notice of Availability of the Draft Resource Management Plan Amendment and the Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Draft Environmental Impact Statement for Oil and Gas Development for the White River Field Office in...) for the White River Field Office (WRFO) and by this notice is announcing the opening of the comment..., and/or mailings. ADDRESSES: You may submit comments related to the WRFO Oil and Gas Development Draft...

  7. LBNL Institutional Plan, FY 1996--2001. Draft

    SciTech Connect

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  8. 78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... From the Federal Register Online via the Government Publishing Office ] DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety.... Winokur, Chairman. BILLING CODE 3670-01-P ...

  9. 77 FR 27792 - Chassahowitzka National Wildlife Refuge, FL; Draft Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Fish and Wildlife Service Chassahowitzka National Wildlife Refuge, FL; Draft Comprehensive Conservation Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... Refuge System, consistent with sound principles of fish and wildlife management, conservation,...

  10. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 1: Plenary Session

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Briefings from the plenary session of the conference on SSTAC/ARTS Review of the Draft Integrated Technology Plan (ITP) held on 24-28 Jun. 1991 are included. Viewgraphs from the presentations are included.

  11. Federal Facilities Compliance Act, Draft Site Treatment Plan: Compliance Plan Volume. Part 2, Volume 2

    SciTech Connect

    1994-08-31

    This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams.

  12. Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  13. UMTRA water sampling and analysis plan, Tuba City, Arizona. Draft

    SciTech Connect

    Not Available

    1993-09-01

    The purpose of this document is to provide background, guidance, and justification for fiscal year (FY) 1994 water sampling activities for the uranium mil tailings site at Tuba City, Arizona. This sampling and analysis plan will form the basis for groundwater sampling and analysis work orders to be implemented in FY94.

  14. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation plan...

  15. Total Quality Management Implementation Plan.

    DTIC Science & Technology

    1989-06-01

    E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM ( Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16... Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...Reduction PrOtect (O704.Ot8SL Wasilngton, OC 20503j. .EPORT DATE 3. REPORT TYPE AND DATES COVERED June 19891 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total

  16. 77 FR 36573 - DRAFT General Management Plan and Draft Environmental Impact Statement, Fort Matanzas National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    .../FOMA and media outlets. ADDRESSES: Electronic copies of the draft EIS/GMP will be available online at... within a sometimes harsh, but beautiful and rich natural environment. There would be minimal development...

  17. 78 FR 42085 - Draft Guidance for Industry on Pediatric Study Plans: Content of and Process for Submitting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ...The Food and Drug Administration (FDA) is announcing the availability of a draft guidance for industry entitled ``Pediatric Study Plans: Content of and Process for Submitting Initial Pediatric Study Plans and Amended Pediatric Study Plans.'' This draft guidance is intended to provide information to industry on how to submit initial and amended pediatric study plans (PSPs) as required under the......

  18. An exploratory shaft facility in SALT: Draft shaft study plan

    SciTech Connect

    Not Available

    1987-03-01

    This draft Shaft Study Plan describes a program of testing and monitoring in the Exploratory Shafts of a candidate high-level nuclear waste repository site in Deaf Smith County, Texas. The purpose of the programs to assist with site characterization in support of a determination of site suitability for development as a repository design and performance assessment evaluations. The program includes a variety of geological, geophysical, geomechanical, thermomechanical, and geohydrological testing and monitoring. The program is presented as a series of separate studies concerned with geological, geomechanical, and geohydrological site characterization, and with evaluating the mechanical and hydrological response of the site to construction of the shafts. The various studies, and associated test or monitoring methods are shown. The procedure used in developing the test program has been to initially identify the information necessary to satisfy (1) federal, state, and local requirements, and (2) repository program requirements. These information requirements have then been assessed to determine which requirements can be addressed wholly or in significant part by monitoring and testing from within the shafts. Test methods have been identified to address specific information requirements. 67 refs., 39 figs., 31 tabs.

  19. 78 FR 28747 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Direct Final... Carolina State Implementation Plan (SIP) submitted on February 3, 2010, through the North...

  20. 76 FR 55939 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact Statement for the Lander Resource Management Plan Revision Project, Lander Field Office...: You may submit comments related to the Lander Resource Management Plan Revision Project by any of...

  1. Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000

    SciTech Connect

    1995-03-03

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

  2. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... materials separation plan? 60.1065 Section 60.1065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a...

  3. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... materials separation plan? 60.1065 Section 60.1065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a...

  4. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... materials separation plan? 60.1065 Section 60.1065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a...

  5. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... materials separation plan? 60.1065 Section 60.1065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a...

  6. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... materials separation plan? 60.1065 Section 60.1065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a...

  7. Geothermal energy planning and communication for native Americans. Final report. Draft

    SciTech Connect

    Robertson, T.A.

    1982-03-30

    The purpose was to explore and develop geothermal energy resources on Indian lands. Activities included the following: (1) continued review of Indian communities and their potential for geothermal energy development; (2) introduced tribes to the availability of geothermal energy and removed the barriers to the implementation of this energy source; (3) provided information by telephone and by mailing packages of information; (4) published articles on geothermal energy development in the UIPA newsletter and supplied articles to other Indian publication; (5) conducted two seminars specific to geothermal energy development on Indian lands in western states; (6) carried out survey of Indian attitudes and opinions toward energy in general and geothermal energy in specific; (7) incorporated geothermal energy development information in Economic Development Administration sponsored tribal government management programs, and (8) developed draft written material addressing Indian planning problems and supporting their ability to affect a more productive working relationship with government agencies and reduced dependency.

  8. 78 FR 29124 - Draft Environmental Impact Statement (EIS) for the Implementation of Energy, Water, and Solid...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... plant (Alternative 4); construction and operation of a geothermal energy facility (Alternative 5); and... Department of the Army Draft Environmental Impact Statement (EIS) for the Implementation of Energy, Water... implement Net Zero energy, water and waste initiatives by 2020 at Fort Bliss to meet mandates for...

  9. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  10. Planning Targets for Phase II Watershed Implementation Plans

    EPA Pesticide Factsheets

    On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.

  11. Individualized Career Plan (ICP): Implementation Manual.

    ERIC Educational Resources Information Center

    Batsche, Catherine; And Others

    This implementation manual was designed to assist local education agency personnel implement the individualized career plan (ICP) concept in high schools. Questions commonly asked about the ICP are answered. Guidelines are then provided for implementing the four stages of the process: planning, developing, implementing, and evaluating/refining.…

  12. 76 FR 52966 - Kawailoa Wind Energy Generation Facility, Oahu, HI; Draft Habitat Conservation Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ... Lingle announced in October 2008 a comprehensive alternative energy agreement between the State of Hawaii... energy. The State seeks to move Hawaii toward having 70 percent of its energy use coming from alternative... Fish and Wildlife Service Kawailoa Wind Energy Generation Facility, Oahu, HI; Draft Habitat...

  13. 77 FR 49824 - Draft Environmental Assessment and Draft Habitat Conservation Plan for TransCanada Keystone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... practicable. Background The Keystone XL Pipeline Project was previously proposed by TransCanada, with a... Permit. The proposed Keystone XL Pipeline Project extended from Canada to the Gulf Coast. A draft environmental impact statement was prepared by the DOS for the Keystone XL Pipeline Project. The...

  14. 78 FR 32237 - Draft Initial Comprehensive Plan and Draft Programmatic Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ... comments. SUMMARY: In accordance with the Resources and Ecosystems Sustainability, Tourist Opportunities... Gulf Coast Ecosystem Restoration Council (Council), announces the availability of a Draft Initial... preliminary lists of ecosystem restoration projects that are ``authorized but not yet commenced'' and the full...

  15. Schedule optimization study implementation plan

    SciTech Connect

    Not Available

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  16. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Management of Infertility. The draft plan can be found at http://www.regulations.gov Docket No. CDC-2012-0004... for the Prevention, Detection, and Management of Infertility, which was subsequently developed...

  17. Questions to Consider When Reviewing Draft WIOA State Plans. WIOA Game Plan for Low-Income People

    ERIC Educational Resources Information Center

    Center for Law and Social Policy, Inc. (CLASP), 2016

    2016-01-01

    As states release draft Workforce Innovation and Opportunity Act (WIOA) state plans for public comment, advocates and other stakeholders have an important opportunity to improve them. The Center for Law and Social Policy (CLASP) is offering a list of questions, which is included in this document, to consider when reviewing state plans. These…

  18. 77 FR 60457 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ...: U.S. mail: Regional Director, Attn: Rick Amidon, U.S. Fish and Wildlife Service, Ecological Services... Fish and Wildlife Service Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area; Reopening of Comment Period AGENCY: Fish and Wildlife Service,...

  19. 75 FR 52549 - Environmental Impact Statement; Alabama Beach Mouse Draft General Conservation Plan; Fort Morgan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Fish and Wildlife Service Environmental Impact Statement; Alabama Beach Mouse Draft General... Beach Mouse General Conservation Plan (ABM GCP) Project. We are preparing the ABM GCP under the... are included in the plan: Alabama beach mouse (ABM) (Peromyscus polionotus ammobates), Loggerhead...

  20. 77 FR 37438 - Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga Valley National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... National Park Service Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga Valley... Environmental Impact Statement will be available for public comment for a 60-day public review period. Comments... NPS, have prepared a comprehensive updated Trail Management Plan and Environmental Impact Statement...

  1. 78 FR 35319 - Solicitation for a Cooperative Agreement-Curriculum Development: Planning and Implementing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... of mental illness. The awardee will produce a program description (overview), detailed narrative... mental illness. Scope of Work: The cooperative agreement awardee will draft a curriculum on (1) the key...: Planning and Implementing Effective Mental Health Services in Jails AGENCY: National Institute of...

  2. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  3. Facility Planning for Technology Implementation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.; Stewart, G. Kent

    1993-01-01

    When planning new school buildings or modifications to existing structures, checking facility planning in relation to technology planning is critical. Areas requiring serious attention include space, electricity, lighting, security, furnishings, shielding, and acoustics. (MLF)

  4. Facility Planning for Technology Implementation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.; Stewart, G. Kent

    1993-01-01

    When planning new school buildings or modifications to existing structures, checking facility planning in relation to technology planning is critical. Areas requiring serious attention include space, electricity, lighting, security, furnishings, shielding, and acoustics. (MLF)

  5. 76 FR 20347 - Release of Draft Integrated Review Plan for the National Ambient Air Quality Standards for Lead

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... AGENCY Release of Draft Integrated Review Plan for the National Ambient Air Quality Standards for Lead... National Ambient Air Quality Standards for Lead (draft IRP). This document contains the plans for the review of the air quality criteria and national ambient air quality standards (NAAQS) for lead (Pb). The...

  6. 76 FR 45848 - Draft Environmental Impact Statement on a Denali Park Road Vehicle Management Plan for Denali...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... National Park Service Draft Environmental Impact Statement on a Denali Park Road Vehicle Management Plan for Denali National Park and Preserve AGENCY: National Park Service, Interior. ACTION: Notice of availability of the Draft Environmental Impact Statement on a Denali Park Road Vehicle Management Plan for...

  7. 76 FR 10342 - Availability of Fiscal Years 2011-2016 Draft Strategic Plan and Request for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Availability of Fiscal Years 2011-2016 Draft Strategic Plan and Request for Public Comment AGENCY: Department of Energy (DOE). ACTION: Notice of availability of DOE's Draft Strategic Plan and request for...

  8. 78 FR 36566 - Endangered and Threatened Wildlife and Plants; Technical Agency Draft Recovery Plan for Golden Sedge

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Technical Agency Draft Recovery Plan for Golden Sedge AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability... draft recovery plan, you may obtain a copy by contacting the Raleigh Ecological Services Field Office, U...

  9. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... deep draft channel and harbor? 148.215 Section 148.215 Navigation and Navigable Waters COAST GUARD... General § 148.215 What if a port has plans for a deep draft channel and harbor? (a) If a State port will be directly connected by pipeline to a proposed deepwater port, and has existing plans for a...

  10. 78 FR 2425 - Notice of Availability of a Supplement to the Eastern Interior Draft Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... Bureau of Land Management Notice of Availability of a Supplement to the Eastern Interior Draft Resource Management Plan/Environmental Impact Statement for Leasing of Hardrock Minerals in the White Mountains... the availability of a Supplement to the Draft Resource Management Plan (RMP) and Environmental Impact...

  11. The Effectiveness of Teaching 10th-Grade Students STOP, AIMS, and DARE for Planning and Drafting Persuasive Text

    ERIC Educational Resources Information Center

    Kiuhara, Sharlene A.; O'Neill, Robert E.; Hawken, Leanne S.; Graham, Steve

    2012-01-01

    Explicitly and systematically teaching strategies for planning and drafting specific types of text has improved the writing of elementary and middle school students with disabilities in previous studies. In this investigation, we examined the effect of teaching a planning and drafting strategy for persuasive writing to high school students with…

  12. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 6: Controls and guidance

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft Integrated Technology Plan (ITP) on controls and guidance are included. Topics covered include: strategic avionics technology planning and bridging programs; avionics technology plan; vehicle health management; spacecraft guidance research; autonomous rendezvous and docking; autonomous landing; computational control; fiberoptic rotation sensors; precision instrument and telescope pointing; microsensors and microinstruments; micro guidance and control initiative; and earth-orbiting platforms controls-structures interaction.

  13. Developing and Implementing a Marketing Plan.

    ERIC Educational Resources Information Center

    McCalmon, Byron G.

    1987-01-01

    A program focusing on recruitment of new freshmen at the University of Colorado at Boulder illustrates some major planning considerations in the development, implementation, and evaluation of a marketing plan. (MSE)

  14. A test implementation of the MPI draft message-passing standard

    SciTech Connect

    Gropp, W.; Lusk, E.

    1992-12-01

    Message passing is a common method for programming parallel computers. The lack of a standard has significantly impeded the development of portable software libraries for these machines. Recently, an ad-hoc committee was formed to develop a standard for message-passing software for parallel computers. This group first met in April 1992 at a workshop sponsored in part by the Center for Research on Parallel Computation (CRPC). Four of the attendees at that meeting produced a draft standard, henceforth referred to as the MPI (Message-Passing Interface) draft standard. After review by a larger group, and significant changes in the document, a meeting was held in November to discuss the MPI draft standard. This document is a result of those discussions; it describes a running implementation of in most of the proposed standard,plus additional routines that were suggested by the discussions at the November meeting.

  15. A test implementation of the MPI draft message-passing standard

    SciTech Connect

    Gropp, W.; Lusk, E.

    1992-12-01

    Message passing is a common method for programming parallel computers. The lack of a standard has significantly impeded the development of portable software libraries for these machines. Recently, an ad-hoc committee was formed to develop a standard for message-passing software for parallel computers. This group first met in April 1992 at a workshop sponsored in part by the Center for Research on Parallel Computation (CRPC). Four of the attendees at that meeting produced a draft standard, henceforth referred to as the MPI (Message-Passing Interface) draft standard. After review by a larger group, and significant changes in the document, a meeting was held in November to discuss the MPI draft standard. This document is a result of those discussions; it describes a running implementation of in most of the proposed standard,plus additional routines that were suggested by the discussions at the November meeting.

  16. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... implementation plan and implementation regulations for a financed program on the business plan. The... program, including: (1) The reduction fishery; (2) The reduction methodology; (3) The maximum reduction... methodology; (3) The maximum reduction cost; (4) The reduction-cost funding, if any, other than Federal...

  17. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... boundary of Glacier Bay National Park. The Planning Area encompasses the cities of Haines and Skagway. The... helicopter landings in the planning area include commercial filming, glacier landing tours, and...

  18. Oil program implementation plan FY 1996--2000

    SciTech Connect

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  19. 76 FR 74805 - Draft Environmental Assessment, Incidental Take Plan, and Application for an Incidental Take...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... Program; Correction AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability; announcement of public meeting. SUMMARY: On November 9, 2011, we, the U.S. Fish and Wildlife Service (Service... Fish and Wildlife Service Draft Environmental Assessment, Incidental Take Plan, and Application for...

  20. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... National Park Service General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas AGENCY: National Park Service, Interior. ACTION: Notice of Availability. SUMMARY: Pursuant to the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park...

  1. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... gates, and fish ladder, and regulate the water level upstream of Keno Dam in accordance with the... Fish and Wildlife Service Draft Environmental Assessment and Proposed Habitat Conservation Plan for the..., and Siskiyou County, CA AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of...

  2. 78 FR 5494 - Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... National Park Service Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith... costs associated with ORV management. New and current education and outreach efforts would also continue.... SUMMARY: Pursuant to Sec. 102(2)(C) the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C...

  3. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  4. 77 FR 76065 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm Springs Dace AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document availability for review and comment. SUMMARY: The U.S. Fish and Wildlife Service (Service) announces the...

  5. 77 FR 31379 - Hart Mountain National Antelope Refuge, Lake County, OR; Draft Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... Fish and Wildlife Service Hart Mountain National Antelope Refuge, Lake County, OR; Draft Comprehensive... to revise the comprehensive conservation plan (CCP) for Hart Mountain National Antelope Refuge... regulations. Hart Mountain National Antelope Refuge The Refuge's approved boundary encompasses 277,893...

  6. 75 FR 52357 - Request for Comment: National Center for Complementary and Alternative Medicine Draft Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-25

    ... for Comment: National Center for Complementary and Alternative Medicine Draft Strategic Plan ACTION: Notice. SUMMARY: The National Center for Complementary and Alternative Medicine (NCCAM) is developing its... Center for Complementary and Alternative Medicine (NCCAM) was established in 1998 with the mission...

  7. 78 FR 47410 - General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... Recreation Area, New Jersey and New York AGENCY: National Park Service, Interior. ACTION: Notice of... Management Plan (GMP), Gateway National Recreation Area (Gateway), New York. The draft describes and analyzes... National Recreation Area, 210 New York Avenue, Staten Island, New York 10305 or telephone at (718) 354-4663...

  8. Response to the Articles on the Draft 2010 National Educational Technology Plan

    ERIC Educational Resources Information Center

    Atkins, Dan; Bennett, John; Brown, John Seely; Dede, Chris; Fishman, Barry; Means, Barbara, Pea, Roy; Thille, Candace; Williams, Brenda

    2011-01-01

    As people who were involved with drafting the 2010 National Educational Technology Plan (NETP), the authors have taken the opportunity to respond to the very interesting perspectives in this special issue. The thoughts here represent only their views and are not an official statement of either the US Department of Education or the NETP Technical…

  9. 77 FR 66626 - Deepwater Horizon Oil Spill; Draft Early Restoration Plan and Environmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Deepwater Horizon Oil Spill; Draft Early Restoration Plan and Environmental Review AGENCY: Interior. ACTION... Addressing Injuries Resulting from the Deepwater Horizon Oil Spill, the Federal and State natural resource... oil spill, which occurred on or about April 20, 2010, in the Gulf of Mexico. The purpose of this...

  10. 75 FR 74073 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... for the Northern Spotted Owl (Strix occidentalis caurina); Reopening of Public Comment Period AGENCY... Revised Recovery Plan for the Northern Spotted Owl (Strix occidentalis caurina) for public review and...://www.fws.gov/oregonfwo/Species/Data/NorthernSpottedOwl/Recovery/ . Printed copies of the draft revised...

  11. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 5: Human Support

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft integrated technology plan (ITP) on human support are included. Topics covered include: human support program; human factors; life support technology; fire safety; medical support technology; advanced refrigeration technology; EVA suit system; advanced PLSS technology; and ARC-EVA systems research program.

  12. Draft Plan for Development of the Integrated Science Assessment for Nitrogen Oxides - Health Criteria

    EPA Science Inventory

    EPA has announced a draft development plan for the next Integrated Science Assessment (ISA) for the health effects of nitrogen oxides (NOX) which will serve as the scientific basis for review of the primary (health-based) National Ambient Air Quality Standard for nitrogen dioxide...

  13. 75 FR 4794 - Draft Revised Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... From the Federal Register Online via the Government Publishing Office ] DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2010-2015 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with OMB Circular No. A-11, the Defense Nuclear...

  14. 76 FR 72718 - Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... Environmental Impact Statement, Oregon/Washington AGENCY: Bureau of Land Management, Interior. ACTION: Notice... Office, P.O. Box 947, Baker City, Oregon 97814. Copies of the Draft RMP/EIS are available in the Baker... Planning Area is located in Baker, Malheur, Union, Wallowa, Morrow, and Umatilla Counties in Oregon and...

  15. Draft Plan for Development of the Integrated Science Assessment for Nitrogen Oxides - Health Criteria

    EPA Science Inventory

    EPA has announced a draft development plan for the next Integrated Science Assessment (ISA) for the health effects of nitrogen oxides (NOX) which will serve as the scientific basis for review of the primary (health-based) National Ambient Air Quality Standard for nitrogen dioxide...

  16. Draft Site Management and Monitoring Plan, Corpus Christi Site Management and Monitoring Plan for Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for comment this Draft Site Management and Monitoring Plan, Corpus Christi Site Management and Monitoring Plan for Maintenance and New Work Ocean Dredged Material Disposal Site

  17. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an... requirements that the state and local governments, as Empowerment Zone designees, have agreed to meet...

  18. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  19. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  20. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  1. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  2. 77 FR 45368 - Draft Environmental Assessment, Habitat Conservation Plan, and Application for an Incidental Take...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ...-turbine wind farm. Pursuant to the ESA and the National Environmental Policy Act, we announce the... CPP's 28-turbine wind farm. A conservation program to minimize and mitigate for the impacts of the incidental take would be implemented by CPP as described in the draft Criterion Wind Indiana Bat Habitat...

  3. Draft reclamation program plan for site characterization; Yucca Mountain project

    SciTech Connect

    1989-08-01

    As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation`s first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs.

  4. Savannah River Site environmental implementation plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  5. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  6. Camp Minden Draft QASP and Work Plan for Public Feedback

    EPA Pesticide Factsheets

    ESI has developed these operational plans, technical approaches, and related required resources based upon extensive review and planning for material removal, transportation, staging, and Contained Burn Chamber (CBC) destruction of materials.

  7. 78 FR 26026 - Draft Plan for Development of the Integrated Science Assessment for Nitrogen Oxides-Health Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... AGENCY Draft Plan for Development of the Integrated Science Assessment for Nitrogen Oxides--Health... Science Assessment for Nitrogen Oxides--Health Criteria.'' The draft document was prepared by the National... review of the primary (health-based) national ambient air quality standards (NAAQS) for nitrogen dioxide...

  8. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... copy of the existing plans for the construction of a deep draft channel and harbor; (3) Certification that the port has an active study by the Secretary of the Army for the construction of a deep draft... construction; (4) Any available documentation on: (i) Initial costs, by phases if development is staged,...

  9. 76 FR 40390 - Notice of Availability of a Draft Land Use Plan Amendment, Environmental Impact Statement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Bureau of Land Management Notice of Availability of a Draft Land Use Plan Amendment, Environmental Impact Statement and Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy...

  10. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear... Nuclear Power Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan... Security and Incident Response is issuing the SRP Section 13.6.6 (Enclosure 1) for the purpose of...

  11. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ...: You may submit comments by the following methods: Via the internet on the PEPC Web site http..., and internet updates have kept the public informed and involved throughout the planning process. The... our research on the site's history, archeology, inhabitants and events with emphasis on...

  12. Drafting a Customized Tech Plan: Throw out Yesterday's Creaky Model

    ERIC Educational Resources Information Center

    Solomon, Gwen

    2004-01-01

    Today, states and districts are zeroing in on standards-based learning and high stakes test scores--even benchmarking results in advance of the school year. Technology planning is--or should be--a key part of any such learning design. With careful planning for integration districts can be helped to more successfully address standards and, in…

  13. Energy for the Future. The Draft 1991 Northwest Power Plan.

    ERIC Educational Resources Information Center

    Clearing, 1991

    1991-01-01

    The Northwest Power Plan, developed by the Northwest Power Planning Council to deal with the increasing demands for energy by the Pacific Northwest, is discussed. An idea of how sufficient energy could be produced as well as preserve the qualities of life that make the Pacific Northwest special is presented. (KR)

  14. State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the ground-level ozone standard.

  15. Chesapeake Bay Watershed Implementation Plans (WIPs)

    EPA Pesticide Factsheets

    This page provides an overview of Watershed Implementation Plans (WIP) and how they play an important role in restoring the Chesapeake Bay. The page also provides links to each jurisdiction's Phase I, II, and III WIP.

  16. A Structured Process for Implementing Strategic Planning.

    ERIC Educational Resources Information Center

    Goodin, Penny G.; Myers, William S.; Nichols, W. Randolph

    1998-01-01

    The Chesapeake (Virginia) Public Schools developed a strategic school-improvement plan with 178 recommendations representing certain goals: school safety, standards, effectiveness, efficiency, staff training, technology integration, community involvement, and facilities. The implementation process consisted of assigning responsibilities,…

  17. Lead State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the lead air emissions standard.

  18. PM State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the PM air emissions standard.

  19. Tactical Fuel and Energy Implementation Plan

    DTIC Science & Technology

    2010-09-24

    Technologies Corporation, in a briefing titled “ Software Modeling and Validation of a Microgrid ,” delivered to the Alternative Energy NOW Conference, Orlando...and Energy Implementation Plan 2 This plan is focused on the tactical environment, defined as maneuver brigade combat team (BCT) and below. The...Soldiers must clearly understand what is expected of them, and must know how to implement the new behaviors, once they have been defined

  20. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    SciTech Connect

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  1. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  2. 78 FR 46603 - Notice of Availability of a Draft White-Tailed Deer Management Plan, Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... reproductive control of does would be used to restrict population growth when this technology meets certain... population. If you wish to comment on the Draft Plan/EIS, we encourage you to comment via the Internet at the...

  3. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  4. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  5. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  6. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  7. Draft Final Ambient Air Monitoring Plan July 2015

    EPA Pesticide Factsheets

    This work plan describes the ambient air sampling program for the New Bedford Harbor Superfund Site and presents the locations, sampling strategies, and exposure limits for monitoring remedial activities in the Harbor.

  8. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  9. Planning and Implementing a Global Studies Curriculum.

    ERIC Educational Resources Information Center

    Helmkamp, Caroline J.

    This report on the experimental Northeast Global Studies Middle Magnet School in Kansas City, Missouri, discusses the planning and implementation of a global studies curriculum to be implemented by the school. The 1990-1991 school year was the school's first as a magnet school under a consent decree issued by a federal judge. The decree was…

  10. Waste generator services implementation plan

    SciTech Connect

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  11. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  12. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  13. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  14. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10256 Contents of implementation plan. The implementation plan for the Reservation of the Kootenai Tribe of Idaho consists of the following...

  15. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10256 Contents of implementation plan. The implementation plan for the Reservation of the Kootenai Tribe of Idaho consists of the following...

  16. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists...

  17. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists...

  18. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists...

  19. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists...

  20. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  1. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  2. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  3. Oracle accrual plans from requirements to implementation

    SciTech Connect

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  4. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan...

  5. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan...

  6. 77 FR 35395 - Draft Five-Year Plan (2013-2017) for the National Toxicology Program Interagency Center for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... NICEATM-ICCVAM Five-Year Plan. The plan describes four core strategies to foster and promote development... the validation and regulatory acceptance of new test methods and testing strategies. In 2008, NICEATM... methods and strategies, and contribute to the transformation of toxicology. The draft plan describes four...

  7. Food for Thought: Discussion Draft for a Master Plan.

    ERIC Educational Resources Information Center

    Chicago City Coll., IL.

    Articles contributed by the teachers and administrators at Chicago City College are presented in this report. Topics include: Students, Faculty, A View of General Education, Occupational Education, Collective Comprehensiveness, Innovation Plan for Crane Campus, Fiscal Resources, Governance, Administration and Organization, A Note on Community…

  8. U.S. Draft Domestic Action Plan for Lake Erie

    EPA Pesticide Factsheets

    In 2016, in response to the 2012 Great Lakes Water Quality Agreement commitments, Canada and the U.S. adopted phosphorus reduction targets for Lake Erie. Each country is developing domestic action plans which outline strategies for meeting the new targets.

  9. Defense Special Case Transuranic Waste Implementation Plan

    SciTech Connect

    Pierce, G.D. . Joint Integration Office); Carson, P.H. Corp., Boulder, CO )

    1987-06-01

    The purpose of the Special Case Implementation Plan (SCIP) is to establish a comprehensive plan for the efficient long-term management and disposal of defense special case (SC) transuranic (TRU) waste. To fulfill this purpose, a review of SC waste management strategies (at both the site-specific and TRU program levels), waste characteristics and inventories, processing and transportation options, and disposal requirements was made. This review provides a plan for implementing policy decisions and useful information for making those decisions. The SCIP is intended to provide a baseline plant to which alternate plans can be compared. General potential alternatives are provided for future consideration when data concerning facility availability and costs are better defined. Milestones for the SC Implementation Plan are included which summarize each SC waste site. The cost of implementing the SC program has an upper limit of $89 million for the worst case scenario. The actual cost of implementation could be dramatically lower than the worst case figure. 15 refs., 3 figs., 12 tabs.

  10. 76 FR 31973 - Draft WaterSMART Strategic Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... available science to understand the impacts of climate change on water supplies; and provide Federal... and time. It is increasingly recognized that water is the primary means through which climate change... environment, and will identify adaptive measures needed to address climate change and future demands. Within...

  11. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    SciTech Connect

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  12. NERSC Strategic Implementation Plan 2002-2006

    SciTech Connect

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  13. Maintenance implementation plan for solid waste management

    SciTech Connect

    Reddinger, R.W., Westinghouse Hanford

    1996-06-27

    This Maintenance Implementation Plan (MIP)was developed for implementation of the U.S. Department of Energy (DOE) Order 4330.4A, A Maintenance Implementation Program (DOE 1990) which has been replaced by 4330.4B (DOE 1994) at the Hanford Site SWM complex. It addresses maintenance functions associated with SWM, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for SWM was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The objective of this MIP is to provide baseline information for the control and execution of SWM Maintenance activities relative to the requirements of Order 4330.4B, Chapter II. (Nuclear Facilities) It also describes actions that are planned to achieve compliance. Section 2.0 of this MIP summarizes the mission, history, and future plans of SWM. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy (both near- term and long-term) for implementing improvements to the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, including objectives of each element, a discussion of how SWM addresses these objectives, proposed improvements, and references to Westinghouse Hanford Company (Westinghouse Hanford) policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 presents the implementation schedule for planned improvements.

  14. Site characterization plan overview: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Consultation Draft

    SciTech Connect

    1988-01-01

    The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE`s repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab.

  15. Interim Draft: Biological Sampling and Analysis Plan Outline ...

    EPA Pesticide Factsheets

    Standard Operation Procedures This interim sampling and analysis plan (SAP) outline was developed specifically as an outline of the output that will be generated by a developing on-line tool called the MicroSAP. The goal of the MicroSAP tool is to assist users with development of SAPs needed for site characterization, verification sampling, and post decontamination sampling stages of biological sampling and analysis activities in which the EPA would be responsible for conducting sampling. These activities could include sampling and analysis for a biological contamination incident, a research study, or an exercise. The development of this SAP outline did not consider the initial response of an incident, as it is assumed that the initial response would have been previously completed by another agency during the response, or the clearance phase, as it is assumed that separate committee would be established to make decisions regarding clearing a site. This outline also includes considerations for capturing the associated data quality objectives in the SAP.

  16. 40 CFR 209.10 - Approval of plan, implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Approval of plan, implementation. (a) If the Administrator finds that the remedial plan is designed to... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Approval of plan, implementation. 209... implementation of the approved plan upon receipt of notice from the Administrator that the remedial plan has...

  17. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  18. NASA Education Implementation Plan 2015-2017

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  19. How to Plan and Implement a Workshop.

    ERIC Educational Resources Information Center

    Howell, Jacquie

    These guidelines were developed to assist school administrators who have the responsibility of organizing a one- to three-day professional development program. The first section outlines the tasks involved in planning and implementing a workshop. The remaining sections cover the following: (1) developing and utilizing the workshop theme; (2)…

  20. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  1. Evaluating the Implementation of School Wellness Plans

    ERIC Educational Resources Information Center

    Tavenner, Patricia Lynn; Tomlinson, Jaret W.

    2011-01-01

    This problem-based learning project addressed the need to improve the implementation of school wellness plans in Missouri. Student health and well-being are at the forefront of educational issues throughout our country. The project performed a discrepancy analysis through three components. The components consisted of developing a knowledge base…

  2. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  3. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  4. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... economic development standards of this subpart. (b) Proposed funded project or activity. The project or activity proposed in the implementation plan is subject to the following requirements: (1) The Federal... of 1970 (URA) (42 U.S.C. 4601 et seq.); (4) The environmental review and approval requirements of...

  5. General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft

    NASA Technical Reports Server (NTRS)

    Dove, Edwin; Hughes, Steve

    2007-01-01

    The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

  6. 78 FR 60700 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 Source Specific Federal Implementation Plan for Implementing Best Available... Federal Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement...

  7. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Plan for the Kootenai Tribe of Idaho § 49.10256 Contents of implementation plan. The implementation plan for the Reservation of the Kootenai Tribe of Idaho consists of the following rules, regulations...

  8. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists of the following rules...

  9. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on...

  10. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on...

  11. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on...

  12. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on...

  13. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on...

  14. Draft Plan for Characterizing Commercial Data Products in Support of Earth Science Research

    NASA Technical Reports Server (NTRS)

    Ryan, Robert E.; Terrie, Greg; Berglund, Judith

    2006-01-01

    This presentation introduces a draft plan for characterizing commercial data products for Earth science research. The general approach to the commercial product verification and validation includes focused selection of a readily available commercial remote sensing products that support Earth science research. Ongoing product verification and characterization will question whether the product meets specifications and will examine its fundamental properties, potential and limitations. Validation will encourage product evaluation for specific science research and applications. Specific commercial products included in the characterization plan include high-spatial-resolution multispectral (HSMS) imagery and LIDAR data products. Future efforts in this process will include briefing NASA headquarters and modifying plans based on feedback, increased engagement with the science community and refinement of details, coordination with commercial vendors and The Joint Agency Commercial Imagery Evaluation (JACIE) for HSMS satellite acquisitions, acquiring waveform LIDAR data and performing verification and validation.

  15. 76 FR 4719 - Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ...The U.S. Fish and Wildlife Service published FR Doc. 2010- 26655 in the Federal Register on October 21, 2010, announcing availability of the draft revised Comprehensive Conservation Plan (CCP) and Environmental Assessment (EA) for Selawik National Wildlife Refuge. The document identified a review period ending on January 15, 2011. Due to the holiday rush and delayed postal delivery of some materials for public involvement, we are concerned that many people will not be able to meet our deadline; therefore we are reopening the comment period until March 15, 2011.

  16. Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols

    SciTech Connect

    Mayhorn, Ebony T.; Sullivan, Greg P.; Petersen, Joseph M.; Baechler, Michael C.

    2015-09-29

    This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.

  17. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  18. Model State Implementation Plan (SIP) Documentation for Wind Energy Purchase in State with Renewable Energy Set-Aside: Execution through November 30, 2004

    SciTech Connect

    Hathaway, A.; Jacobson, D.; High, C.

    2005-05-01

    This model documentation is designed to assist State and local governments in pursuing wind energy purchases as a control measure under regional air quality plans. It is intended to support efforts to draft State Implementation Plans (SIPs), including wind energy purchases, to ensure compliance with the standard for ground-level ozone established under the Clean Air Act.

  19. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Implementation Plan Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: The Environmental Protection Agency (EPA) is proposing to approve a revision to the New York State...

  20. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  1. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  2. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  3. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  4. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  5. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  6. Tactical Fuel and Energy Implementation Plan

    DTIC Science & Technology

    2010-09-24

    Software Modeling and Validation of a Microgrid ,” delivered to the Alternative Energy NOW Conference, Orlando, FL, 9 February 2010. 34Ibid. 35...This plan is focused on the tactical environment, defined as maneuver brigade combat team (BCT) and below. The study team developed the objectives...what is expected of them, and must know how to implement the new behaviors, once they have been defined . Education is essential in establishing

  7. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Provisions for Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Submittal of State implementation plan...

  8. 75 FR 78705 - Issuance of Exposure Drafts on Implementation Guidance on the Accounting for the Disposal of G-PP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-16

    ... From the Federal Register Online via the Government Publishing Office FEDERAL ACCOUNTING STANDARDS ADVISORY BOARD Issuance of Exposure Drafts on Implementation Guidance on the Accounting for the Disposal of... Accounting Standards Advisory Board. ACTION: Notice. Board Action: Pursuant to 31 U.S.C. 3511(d), the Federal...

  9. Puget Sound Area Electric Reliability Plan. Appendix B : Local Generation Evaluation : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The information and data contained in this Appendix was extracted from numerous sources. The principle sources used for technical data were Bonneville Power Administration's 1990 Resource Program along with its technical appendix, and Chapter 8 of the Draft 1991 Northwest Conservation and Electric Power Plan. All cost data is reported 1988 dollars unless otherwise noted. This information was supplemented by other data developed by Puget Sound utilities who participated on the Local Generation Team. Identifying generating resources available to the Puget Sound area involved a five step process: (1) listing all possible resources that might contribute power to the Puget Sound area, (2) characterizing the technology/resource status, cost and operating characteristics of these resources, (3) identifying exclusion criteria based on the needs of the overall Puget Sound Electric Reliability Plan study, (4) applying these criteria to the list of resources, and (5) summarizing of the costs and characteristics of the final list of resources. 15 refs., 20 tabs.

  10. 327 Building fire hazards analysis implementation plan

    SciTech Connect

    BARILO, N.F.

    1999-05-10

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7.

  11. 75 FR 17951 - Notice Re-opening the Comment Period for the Draft Resource Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Draft Environmental Impact Statement for the Clear Creek Management Area, California AGENCY: Bureau of... Statement (EIS) for the Clear Creek Management Area (CCMA). The original notice was published in the Federal...-opening the comment period to end April 19, 2010. FOR FURTHER INFORMATION CONTACT: Sky Murphy,...

  12. Gen IV Materials Handbook Implementation Plan

    SciTech Connect

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  13. 78 FR 47003 - Draft National Spatial Data Infrastructure Strategic Plan; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ...'s role in continued sustainable development of the NSDI. Following the public comment period, a...-16 is to ``prepare and maintain a strategic plan for the development and implementation of the...

  14. 75 FR 57055 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... for Utah Prairie Dog AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of a draft revised recovery plan for the Utah prairie dog (Cynomys parvidens). This species is.... The Utah prairie dog (Cynomys parvidens), found only in southwestern and central Utah, was listed as...

  15. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How do I make my draft materials separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... normal business hours of each library. (5) An agenda of the topics that will be discussed at the...

  16. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How do I make my draft materials separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... normal business hours of each library. (5) An agenda of the topics that will be discussed at the...

  17. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How do I make my draft materials separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... normal business hours of each library. (5) An agenda of the topics that will be discussed at the...

  18. 78 FR 54469 - Solicitation of Written Comments on Draft National Action Plan for Adverse Drug Event Prevention

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... HUMAN SERVICES Solicitation of Written Comments on Draft National Action Plan for Adverse Drug Event... sending comments electronically. Written responses should be addressed to the Department of Health and... submissions will not be considered. Written materials submitted for consideration should not exceed 10 pages...

  19. 76 FR 3209 - West Los Angeles VA Medical Center Veterans Programs Enhancement Act of 1998; Draft Master Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... changing demographics of the Veteran population. It discusses current land uses, facilities, and programs... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF VETERANS AFFAIRS West Los Angeles VA Medical Center Veterans Programs Enhancement Act of 1998; Draft Master Plan...

  20. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; (2) A copy of the existing plans for the construction of a deep draft channel and harbor; (3) Certification that the port has an active study by the Secretary of the Army for the construction of a deep... for the construction; (4) Any available documentation on: (i) Initial costs, by phases if...

  1. 77 FR 14567 - Draft General Management Plan/Environmental Impact Statement for the Ice Age Complex at Cross...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... National Park Service Draft General Management Plan/Environmental Impact Statement for the Ice Age Complex at Cross Plains, Cross Plains, Wisconsin AGENCY: National Park Service, Interior. ACTION: Notice of availability. SUMMARY: Under the National Environmental Policy Act of 1969, the National Park Service (NPS...

  2. 77 FR 56858 - Endangered and Threatened Wildlife and Plants; Draft Recovery Plan for Four Subspecies of Island Fox

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... Subspecies of Island Fox AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document availability... availability of our Draft Recovery Plan for Four Subspecies of Island Fox (Urocyon littoralis) under the Endangered Species Act of 1973, as amended (Act). Each of the four subspecies, San Miguel Island fox (Urocyon...

  3. 78 FR 9387 - Notice of Availability for Public Review and Comment: Draft EPA Climate Change Adaptation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... AGENCY Notice of Availability for Public Review and Comment: Draft EPA Climate Change Adaptation Plan... that the climate is changing at an increasingly rapid rate, outside the range to which society has adapted in the past. Climate change can pose significant challenges to the EPA's ability to fulfill its...

  4. F-16 Implementation and Management. Plan Report.

    DTIC Science & Technology

    1981-03-01

    JXPK1R - .EELOPMENT RER6-.Jio. 18 ,v MARCH, -1" Prepared in fulfillment of CDRL nos. B028, B029, B030, B033, B050, B057, B059 II LECTEI by S JUNO 8...implementation and management plan report (F-16 Development Report No. 18 ). San Diego, Calif.: Courseware, Inc., October 1978, March 1981. Sudweeks...Instruction .............. 17 v . E . CONTENTS (Cont.) Page 3.4 Student Training and Measurement ......... 18 3.4.1 Academic events .............. 18 3.4.2

  5. Implementing Manufacturing Resources Planning for Marine Corps

    DTIC Science & Technology

    1989-06-01

    business planning , production planning, master production planning, capacity requirements planning, and the execution support systems for capacity and...during the following discussion. [Refs. 7 and 131 General business planning sets the overall objectives for the manufacturing concern. The overall...materials plan then generates a set of purchasing and manufacturing requirements that are necessary 57 BUSINESS PLANNING OBJECTIVES MARKETING PLANNING

  6. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  7. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  8. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  9. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  10. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  11. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  12. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  13. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  14. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to public...

  15. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to public...

  16. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each covered...

  17. The draft "National Plan" to address Alzheimer's disease - National Alzheimer's Project Act (NAPA).

    PubMed

    Khachaturian, Zaven S; Khachaturian, Ara S; Thies, William

    2012-05-01

    This perspective updates the status of the "National Plan to Address Alzheimer's Disease" and the recommendations of the NAPA Advisory Council's Sub-committee on Research. Here, we identify some of the critical issues the future reiterations of the National Plan should consider during implementation phase of the plan. The Journal invites the scientific community to contribute additional ideas and suggestions towards a national research initiative. Copyright © 2012 The Alzheimer's Association. Published by Elsevier Inc. All rights reserved.

  18. WHC natural phenomena hazards mitigation implementation plan

    SciTech Connect

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  19. Surface-based test plan, Deaf Smith County, Texas Site: Draft

    SciTech Connect

    Not Available

    1985-05-08

    The Surface-Based Test Plan (SBTP) is the plan which accounts for all surface-based site field work to be conducted at the Permian salt site selected for characterization. The SBTP relates data needs from program requirement documents and presents plans to satisfy the data needs. The SBTP excludes plans for construction of the Exploratory Shaft Facility (ESF) and plans for the in situ testing. The SBTP is a hierarchical plan stemming from the Technical Program Plan. The SBTP describes in detail the process by which surface-based study plans are defined, developed, and controlled. The plans hierarchy extends downward thru subordinate Site Study Plans (SSPs), which describe in detail elements of field work to be done, to detailed Procedures which document the exact methodologies to be employed in the conduct of field work. The plan is a QA level S document, although some of its elements are at lower QA levels. The plan is a controlled document, and any proposed amendments to the plan or subordinate documents can only be implemented through the specified change control procedure.

  20. Science operations planning and implementation for Rosetta

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter

    2002-07-01

    The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.

  1. 75 FR 29897 - Approval and Promulgation of Implementation Plans; New York State Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    .... What is the history and time frame for State Implementation Plan (SIP) submissions? II. What was... is EPA's conclusion? V. Statutory and Executive Order Reviews I. What is the history and time frame... NYCRR Parts 235 and 239. The reader is referred to that proposal for a more detailed discussion of this...

  2. Administrator's Guide to Technology: Planning, Funding & Implementation.

    ERIC Educational Resources Information Center

    Aspen Education Development Group, Gaithersburg, MD.

    This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…

  3. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... INFORMATION CONTACT: Rachel Wolf, Centers for Disease Control and Prevention, National Center for Emerging and... problem of AR. This document, entitled A Public Health Action Plan to Combat Antimicrobial Resistance...

  4. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    .... Comments may also be viewed at http://www.regulations.gov . FOR FURTHER INFORMATION CONTACT: Rachel Wolf... Plan, outlining specific issues, goals, and actions important for addressing the problem of AR. This...

  5. Hanford Tanks Initiative quality assurance implementation plan

    SciTech Connect

    Huston, J.J.

    1998-06-23

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy`s Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing.

  6. Solid Waste Assurance Program Implementation Plan

    SciTech Connect

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixed waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.

  7. Environment, safety, and health regulatory implementation plan

    SciTech Connect

    Not Available

    1993-10-21

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project`s environment, safety, and health (ES&H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project`s regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES&H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status.

  8. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan AGENCY: Environmental... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) from residential water heaters. We... 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final...

  9. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  10. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  11. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  12. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  13. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  14. Getting Started: Planning and Implementing Computer Instruction in Schools.

    ERIC Educational Resources Information Center

    Mojkowski, Charles

    Intended for use by local school district staff, this manual provides step-by-step guidelines for planning and implementing the incorporation of computer-based instruction in the curriculum. Procedures involved in five phases of planning and implementation are outlined, covering: (1) preliminary planning, where schools should establish planning…

  15. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents...

  16. Draft registration of health care personnel.

    PubMed

    Lott, C M

    1991-04-01

    A chronic shortage of health care personnel in the active and reserve forces continues to be of concern, particularly in planning for national emergencies or war. Congress has authorized the Selective Service System to establish a system to register and classify health care personnel rapidly in the event a national emergency requires implementation of a draft for the armed services. This paper describes the creation of the Health Care Personnel Delivery System. It provides a brief history of previous military drafts for health care personnel and describes the principal differences in the way a draft registration program may operate in the future.

  17. Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.

    ERIC Educational Resources Information Center

    Proctor, Enola K.; And Others

    1996-01-01

    Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)

  18. Implementation planning for industrial energy conservation: approach and methodology

    SciTech Connect

    Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

  19. Easing the Transition: How to Implement an Automated Succession Plan.

    ERIC Educational Resources Information Center

    Andrews, Jean P.

    1989-01-01

    An automated succession plan can create smooth transitions when employees transfer or leave the company. It can also boost productivity and employee morale. (Includes a basic nine-step implementation plan that makes the process easy and relatively painless.) (JOW)

  20. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 3: Space power and thermal management

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the SSTAC/ARTS review of the draft integrated technology plan on thermal power and thermal management are presented. Topics covered include: space energy conversion research and technology; space photovoltaic energy conversion; chemical energy conversion and storage; thermal energy conversion; power management; thermal management; space nuclear power; high capacity power; surface power and thermal management; space platforms power and thermal management; and project SELENE.

  1. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  2. 76 FR 56220 - Draft Environmental Impact Statement for General Management Plan for Golden Gate National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... visitors to learn about and enjoy the ocean and bay environments, and gain a better understanding of the... pursuant to the Council on Environmental Quality's regulations (40 CFR parts 1500-08), the National Park Service has prepared a Draft Environmental Impact Statement (Draft EIS) for the updating the General...

  3. Implementation planning for industrial energy conversation: Approach and methodology

    NASA Astrophysics Data System (ADS)

    Alston, T. G.; Falk, G.; Grogan, P. J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implemenation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/ paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented.

  4. Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

    SciTech Connect

    Not Available

    1988-01-01

    The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab.

  5. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application... Tribe/Consortium in drafting its planning grant application? 1000.68 Section 1000.68 Indians OFFICE OF... planning grant application? Yes, upon request from the Tribe/Consortium, a non-BIA bureau may...

  6. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application... Tribe/Consortium in drafting its planning grant application? 1000.68 Section 1000.68 Indians OFFICE OF... planning grant application? Yes, upon request from the Tribe/Consortium, a non-BIA bureau may...

  7. Implementation Plan for 1998-1999. Dalton State College Strategic Plan, 1997-2000.

    ERIC Educational Resources Information Center

    Dalton College, GA. Office of Institutional Research and Planning.

    This document presents the second-year implementation plans for 1998-1999 of Dalton State College's Strategic Plan for 1997-2000. It contains the following planning priorities and action plans for the roles of the: President; Office of Institutional Research and Planning; Office of Public Relations; Dean of Academic Affairs; Division of Business…

  8. 75 FR 69373 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... AGENCY 40 CFR Part 49 Source Specific Federal Implementation Plan for Implementing Best Available...) ] signed a proposal to promulgate a source specific Federal Implementation Plan (FIP) requiring the Four... Federal Register on October 19, 2010 (75 FR 64221). Given the significant public interest in this source...

  9. 76 FR 508 - Approval and Promulgation of Implementation Plans; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Idaho AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Idaho State Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This...

  10. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  11. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  12. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The Federal conformity rules under this subpart, in addition to any existing... requirements until such time as the required conformity SIP revision is approved by EPA. A State's...

  13. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  14. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  15. Planning and Management. Career Education Dissemination Project. Implementation Booklet #7.

    ERIC Educational Resources Information Center

    Benson, Arland; Henriksen, Dorothy, Ed.

    Materials contained in this career education implementation booklet (one in a series of seven) are designed to provide experiences for developing the skills necessary to plan and manage a comprehensive career education program. This booklet focuses on the processes of planning and implementing and is closely related to Booklet #1, Consultation and…

  16. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to public...

  17. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  18. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  19. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents of...

  20. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  1. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contents of implementation plan. The implementation plan for the lands in trust that are within the... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49...

  2. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... implementation plan. The implementation plan for the lands in trust that are within the Puyallup Reservation... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V...

  3. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Contents of implementation plan. The implementation plan for the lands in trust that are within the... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49...

  4. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  5. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  6. 75 FR 14623 - Notice of Availability of the Draft Imperial Sand Dunes Recreation Area Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... and solar energy development, as well as geothermal leasing. Limitations on use of public lands within the East Mesa ACEC include restrictions on wind and solar energy development, as well as geothermal... Conservation Area Plan, CA AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY...

  7. Collaborative multi-stakeholder approach to drafting flood risk management plans in Wallonia, Belgium

    NASA Astrophysics Data System (ADS)

    Maroy, Edith; Javaux, Mathieu; Vandermosten, Pierre; Englebert, Benjamin

    2015-04-01

    The Flood Directive 2007/60/CE establishes a common framework within the European Union for assessing and reducing risks posed by floods on human health, the environment, economic activity and cultural heritage. For that purpose, Member States had to establish flood areas and flood risk maps, and subsequently, flood risk management plans (due December 2015). According to the Directive, special attention is to be paid to international coordination for transboundary water courses, integrated management approaches at the catchment scale, cost-effectiveness of measures and public involvement. Management measures must focus on reducing the probability of flooding and the potential consequences of flooding. They must cover prevention, protection and preparedness and must take into account relevant aspects, such as water management, soil management, spatial planning, land use and nature conservation. Floods in Wallonia mostly originate from overflowing of both little sloped rivers and highly reactive rivers but also, from concentrated runoff in the intensely cultivated and erosion-prone region north of the Sambre-Meuse axis. Consequently, walloon flood area maps not only show flood areas based on hydraulic modelling and observations but also runoff concentration axis in agricultural areas. Now released to the public, this information can be used to assess the risk of damage for land planning and erosion control strategies. Incidentally, some 166 km2 were mapped as flood hazard area with a return period of 25 years, 28.8 of which are urbanized or destined to urbanisation and counting of number of approximatively 39.000 people living in those areas. Flood area and flood risk maps should be the starting point of elaborating flood risk management plans. In order to involve the diversity of water managers and stakeholders in the drafting of a management plan for hydrographic districts in Wallonia, responsible authorities decided to mandate scientists and engineers to organize

  8. Savannah River Site environmental implementation plan. Volume 1, Executive summary

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  9. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  10. Strategic Planning Implementation in Indonesia’s Transmigration Plan.

    DTIC Science & Technology

    1984-06-01

    replaced the Hinduism of the :ndonesians. (Now 90 7,ercent of Indonesia are moslem) excekt for the Balinese, some Javanese , and some Chinese. Currently...block number) I Transmigration, Indonesia , Strategic Planning,"Indon ia s e- velopment Plan, Presidential Decree, t N ASe- Migration, Strategy, Racial...84 5 LIST OF TABLES I. Pcpulation Density of Indonesia in 1978 and 1980 .. ....... ....... ...... *,2 II. Distribution

  11. 76 FR 81727 - Approval and Promulgation of Implementation Plans; Oklahoma; Federal Implementation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ...EPA is partially approving and partially disapproving a revision to the Oklahoma State Implementation Plan (SIP) submitted by the State of Oklahoma through the Oklahoma Department of Environmental Quality on February 19, 2010, intended to address the regional haze requirements of the Clean Air Act (CAA). In addition, EPA is partially approving and partially disapproving a portion of a revision to the Oklahoma SIP submitted by the State of Oklahoma on May 10, 2007 and supplemented on December 10, 2007 to address the requirements of CAA section 110(a)(2)(D)(i)(II) as it applies to visibility for the 1997 8- hour ozone and 1997 fine particulate matter National Ambient Air Quality Standards. This CAA requirement is intended to prevent emissions from one state from interfering with the visibility programs in another state. EPA is approving certain core elements of the SIP including Oklahoma's: determination of baseline and natural visibility conditions; coordinating regional haze and reasonably attributable visibility impairment; monitoring strategy and other implementation requirements; coordination with states and Federal Land Managers; and a number of NOX, SO2, and PM BART determinations. EPA is finding that Oklahoma's regional haze SIP did not address the sulfur dioxide Best Available Retrofit Technology requirements for six units in Oklahoma in accordance with the Regional Haze requirements, or the requirement to prevent interference with other states' visibility programs. EPA is promulgating a Federal Implementation Plan to address these deficiencies by requiring emissions to be reduced at these six units. This action is being taken under section 110 and part C of the CAA.

  12. 76 FR 491 - Approval and Promulgation of Implementation Plans; New Mexico; Federal Implementation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ...EPA is proposing to disapprove a portion of the State Implementation Plan (SIP) revision submitted by the State of New Mexico for the purpose of addressing the ``good neighbor'' requirements of section 110(a)(2)(D)(i) of the Clean Air Act (CAA or Act) for the 1997 8-hour ozone National Ambient Air Quality Standards (NAAQS or standards) and the 1997 fine particulate matter (PM2.5) NAAQS. The SIP revision addresses the requirement that New Mexico's SIP must have adequate provisions to prohibit emissions from adversely affecting another state's air quality through interstate transport. In this action, EPA is proposing to disapprove the New Mexico Interstate Transport SIP provisions that address the requirement of section 110(a)(2)(D)(i)(II) that emissions from New Mexico sources do not interfere with measures required in the SIP of any other state under part C of the CAA to protect visibility. In this action, EPA is also proposing to promulgate a Federal Implementation Plan (FIP) to prevent emissions from New Mexico sources from interfering with other states' measures to protect visibility, and to implement nitrogen oxides (NOX) and sulfur dioxide (SO2) emission limits necessary at one source to prevent such interference. In addition, EPA is proposing sulfuric acid (H2SO4) and ammonia (NH3) hourly emission limits at the same source, to minimize the contribution of these compounds to visibility impairment. EPA is proposing monitoring, recordkeeping and reporting requirements to ensure compliance with such emission limitations. EPA also proposes that compliance with the emission limits be within three (3) years of the effective date of our final rule. Furthermore, EPA is proposing the FIP to address the requirement for best available retrofit technology (BART) for NOX for this source. This action is being taken under section 110 and part C of the CAA.

  13. Implementing a strategic recruitment and retention plan.

    PubMed

    Smeltzer, C H; Tseng, S; Harty, L M

    1991-06-01

    Nurse administrators were faced with how to staff for a rapid expansion in number of beds in the face of a 15% nurse vacancy rate. The authors discuss how they addressed this issue through their multifaceted strategic plan.

  14. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  15. Knowledge co-production and boundary work to promote implementation of conservation plans.

    PubMed

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  16. NATO Allied Medical Publication 7.5 Study Draft 3 (AMedP 7.5 SD.3), NATO Planning Guide for the Estimation of CBRN Casualties

    DTIC Science & Technology

    2015-12-01

    Log: H 15-001016 NATO Allied Medical Publication 7.5 Study Draft 3 (AMedP-7.5 SD.3), “NATO Planning Guide for the Estimation of CBRN Casualties...Update of the Medical CBRN Defense Planning & Response Project,” for the Office of the Surgeon General of the Army and the Joint Staff, Joint... Medical Publication 7.5 Study Draft 3 (AMedP-7.5 SD.3), “NATO Planning Guide for the Estimation of CBRN Casualties” Carl A. Curling, Project Leader

  17. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect

    Not Available

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  18. Are Urban Stream Restoration Plans Worth Implementing?

    NASA Astrophysics Data System (ADS)

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  19. Are Urban Stream Restoration Plans Worth Implementing?

    PubMed

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  20. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  1. AQUATIC STRESSORS: FRAMEWORK AND IMPLEMENTATION PLAN FOR EFFECTS RESEARCH

    EPA Science Inventory

    This document describes the framework and research implementation plans for ecological effects research on aquatic stressors within the National Health and Environmental Effects Laboratory. The context for the research identified within the framework is the common management goal...

  2. Sulfur Dioxide State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Tools, guidance, and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the sulfur dioxide (SO2) air emissions standard.

  3. Implementing the Aquidneck Island West Side Master Plan

    EPA Pesticide Factsheets

    This report describes a technical assistance project with Aquidneck Island to develop approaches for mixed-use zoning standards, design guidelines, and review processes to implement the West Side Master Plan.

  4. Orbiting deep space relay station. Volume 3: Implementation plan

    NASA Technical Reports Server (NTRS)

    Hunter, J. A.

    1979-01-01

    An implementation plan for the Orbiting Deep Space Relay Station (ODSRS) is described. A comparison of ODSRS life cycle costs to other configuration options meeting future communication requirements is presented.

  5. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  6. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  7. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  8. Handbook for Decentralized Education Planning. Implementing National EFA Plans

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    The Dakar 2000 goal of Education For All (EFA) is at the center of UNESCO's education activities worldwide. The wide-ranging efforts to achieve EFA in many countries involve education reform, development strategies and plans. Decentralization, a major component in modernizing the public sector, is also applicable to the education sector. The…

  9. Tank farms justification for continued operations 007 Implementation Plan

    SciTech Connect

    Propson, J.G., Westinghouse Hanford

    1996-08-23

    This Implementation Plan (IP) provides detailed descriptions, cost estimates, and schedules of activities required to implement the controls specified in Flammable Gas/Slurry Growth Unreviewed Safety Question: Justification for Continued Operation for the Tank Farms at Hanford Site (WHC-SD-WM-JCO-007, Rev.0). This IP complies with the Interim Operational Safety Requirements (IOSR) Administrative Control 5.27 and WHC-IP-0842 Volume 4 Section 5.6 for such a plan.

  10. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    SciTech Connect

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs.

  11. Management Planning Requirements for Implementing Office Automation.

    ERIC Educational Resources Information Center

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  12. Department of Defense Training Transformation Implementation Plan

    DTIC Science & Technology

    2003-06-10

    reporting system will be on the joint mission essential tasks of the combatant commanders. Joint Lessons - Learned Program The Secretary of Defense, the...Chairman of the Joint Chiefs of Staff, and the Defense Planning Guidance have highlighted the importance of an effective joint lessons - learned program . The...required for improved joint force readiness. A key component of the Joint Lessons Learned Program —the Joint Center for Lessons Learned—identifies

  13. 40 CFR 51.851 - State Implementation Plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false State Implementation Plan (SIP... Plan (SIP) revision. Link to an amendment published at 75 FR 17272, April 5, 2010. (a) Each State must... to meet the Act requirements until such time as the required conformity SIP revision is approved...

  14. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Master Implementation Sequencing Plan. 385.30 Section 385.30 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN...

  15. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Master Implementation Sequencing Plan. 385.30 Section 385.30 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN...

  16. Bird Conservation Planning and Implementation in Canada's Intermountain Region

    Treesearch

    Ilia Hartasanchez; Krista De Groot; Andre Breault; Rob W. Butler

    2005-01-01

    Bird conservation planning in British Columbia and Yukon has been carried out by each of the major bird initiatives. The purpose of this paper is to provide a status report of planning activities and to discuss how integration of the initiatives is being accomplished for efficient and effective implementation of bird conservation actions.

  17. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  18. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  19. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  20. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  1. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  2. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  3. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  4. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  5. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  6. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X...) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section 49.126Rule for...

  7. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  8. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  9. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  10. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  11. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  12. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  13. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  14. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  15. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  16. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  17. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  18. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  19. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  20. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  1. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  2. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  3. 40 CFR 49.10106 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....135Rule for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  4. 40 CFR 49.10676 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  5. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  6. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  7. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  8. 40 CFR 49.10706 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  9. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (k) Section 49.135Rule for emissions detrimental to public health or welfare. (l) Section 49.137Rule for air pollution episodes. (m) Section 49.138Rule for the registration of air pollution sources and... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  10. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (n) Section 49.137Rule for air pollution episodes. (o) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (p) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  11. 76 FR 69758 - Draft Environmental Assessment, Incidental Take Plan, and Application for an Incidental Take...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... human environment. We will evaluate whether the proposed action (Maine's draft ITP and associated... computer access will be provided with a compact disk or paper copies. Background Section 9 of the ESA (16 U... lynx behavior, changing lynx habitat, and changing lynx populations. Harm and harassment to lynx...

  12. 76 FR 48879 - Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Fish and Wildlife Service Draft Environmental Impact Statement for Alabama Beach Mouse General... endangered Alabama beach mouse (Peromyscus polionotus ammobates) in Baldwin County, Alabama. The GCP analyzes... availability of the proposed GCP and the dEIS. These documents analyze the take of the Alabama beach...

  13. 76 FR 78016 - Deepwater Horizon Oil Spill; Draft Phase I Early Restoration Plan and Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ....S. Fish and Wildlife Service, Interior Deepwater Horizon Oil Spill; Draft Phase I Early Restoration... from the Deepwater Horizon Oil Spill, the Federal and State natural resource trustee agencies (Trustees... resources and services injured or lost as a result of the Deepwater Horizon oil spill, which occurred on or...

  14. 76 FR 22720 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... public review and comment. This and other information regarding the modeling process was posted on our... comment on more detailed information on the habitat modeling process in Appendix C of the Draft Revised... for the spotted owl. Since that was written, we have completed development and testing of this...

  15. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection... Standard in place prior to implementation of the 8-hour ozone standard and including all necessary legal... later than November 15, 1993. For non-attainment areas designated and classified under the 8-hour...

  16. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection... Standard in place prior to implementation of the 8-hour ozone standard and including all necessary legal... later than November 15, 1993. For non-attainment areas designated and classified under the 8-hour...

  17. A K-12 Written Guidance Plan. Minimum Standards Implementation Series.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Elementary and Secondary Education.

    One of a series of implementation documents prepared in conjunction with the revised minimum standards adopted in 1983 by the Ohio State Board of Education for elementary and secondary schools, this leadership document addresses the need, the purpose, and the implementation procedures for a K-12 written guidance plan in accordance with the Ohio…

  18. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 51.1002 Section 51.1002 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan. (a) For any area designated by EPA as nonattainment for the PM2.5 NAAQS, the State must submit a...

  19. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  20. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  1. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  2. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  3. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  4. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  5. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  6. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  7. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  8. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  9. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  10. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  11. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  12. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  13. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  14. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  15. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  16. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  17. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  18. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation...) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section 49.126Rule for...

  19. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  20. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  1. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  2. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  3. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  4. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  5. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....137Rule for air pollution episodes. (o) Section 49.138Rule for the registration of air pollution sources... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation....133Rule for agricultural burning permits. (l) Section 49.134Rule for forestry and silvicultural...

  6. Implementation in Head Start Planned Variation: 1971-72.

    ERIC Educational Resources Information Center

    Lukas, Carol VanDeusen; Wohlleb, Cindy

    This report on model implementation during the third year (1971-72) of the Head Start Planned Variation experiment concentrates on the development of measures of implementation. Measures are examined individually in terms of design and use, strengths and weaknesses, and findings obtained, and agreement among raters on the extent of implementation…

  7. Operational Management Plans: Status, Content, and Implementation

    DTIC Science & Technology

    1989-10-01

    prepared the OMP. This is a form of nonprobability 4 sampling termed purposive (Kerlinger 1973). It is intended to obtain informa- tion on typical units...objectives were to: a. Determine the current status of OMPs from a representative sample of Corps Districts. b. Identify the major topical components of...affords a representation of District interpreta- tion and implementation of OMP guidelines. However, even when requested to provide representative samples

  8. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Treesearch

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  9. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  10. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  11. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  12. 40 CFR 49.10260 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10260 Federally... part of the implementation plan for the Reservation of the Kootenai Tribe of Idaho: (a) Section 49...

  13. 40 CFR 49.10260 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10260 Federally... part of the implementation plan for the Reservation of the Kootenai Tribe of Idaho: (a) Section 49...

  14. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... regulations are incorporated and made part of the implementation plan for the Reservation of the Cow Creek...

  15. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... regulations are incorporated and made part of the implementation plan for the Reservation of the Cow Creek...

  16. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... regulations are incorporated and made part of the implementation plan for the Reservation of the Cow Creek...

  17. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... regulations are incorporated and made part of the implementation plan for the Reservation of the Cow Creek...

  18. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  19. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  20. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  1. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of

  2. Defense Depot Mechanicsburg Total Quality Management Implementation Plan

    DTIC Science & Technology

    1989-06-01

    B T I TLEE 5 . FUNDING NUMBERS Defense Depot Mechanicsburg Total Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME...Form 298 (Rev. 2-89) L296- 102 Acces.ion For NYI J ... I:: ted DEFENSE DEPOT MECHANICSBURG PENNSYLVANIAL--I By_ TOTAL QUALITY MANAGEMENT K_~ t buty-n...IMPLEMENTATION PLAN Avmail-t!Ilty Codes IvLl c 2Dd/or JUN 3 0 1989 iDizt Special PURPOSE The purpose of this Total Quality Management Implementation

  3. ARM Unmanned Aerial Systems Implementation Plan

    SciTech Connect

    Schmid, Beat; Ivey, Mark

    2016-11-01

    Recent advances in Unmanned Aerial Systems (UAS) coupled with changes in the regulatory environment for operations of UAS in the National Airspace increase the potential value of UAS to the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility. UAS include unmanned aerial vehicles (UAV) and tethered balloon systems (TBS). The roles UAVs and TBSs could play within the ARM Facility, particularly science questions they could help address, have been discussed in several workshops, reports, and vision documents, including: This document describes the implementation of a robust and vigorous program for use of UAV and TBS for the science missions ARM supports.

  4. Achieving succession planning and implementation: one healthcare network's story.

    PubMed

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks.

  5. Perioperative Research Fellowship: Planning, Implementation, Experience

    PubMed Central

    Memtsoudis, Stavros G; Mazumdar, Madhu; Stundner, Ottokar; Hargett, Mary J.

    2014-01-01

    Perioperative outcomes research has gained widespread interest and is viewed as increasingly important among different specialties, including anesthesiology. Outcome research studies serve to help in the adjustment of risk, allocation of resources, and formulation of hypotheses to guide future research. Pursuing high quality research projects requires familiarity with a wide range of research methodologies, and concepts are ideally learned in a dedicated setting. Skills associated with the use of these methodologies as well as with scientific publishing in general, however, are increasingly challenging to acquire. This article is intended to describe the curriculum and implementation of the Perioperative Medicine and Regional Anesthesia Research Fellowship at the Hospital for Special Surgery. We also propose a methodology to evaluate the success of a research fellowship curriculum. PMID:24942850

  6. Technical procedures for the implementation of cultural resource site studies, Deaf Smith County, Texas: Preliminary draft

    SciTech Connect

    Not Available

    1987-09-30

    Cultural resources at the Deaf Smith County site will be identified, evaluated and managed through the implementation of studies detailed in the Site Study Plan for Cultural Resources. This technical procedure outlines the conduct of pedestrian survey and the documentation of identified cultural resources. The purpose of the field surveys is to identify and document cultural resources in the areas that will be affected by site characterization activities and to record the environmental setting of identified cultural resources. Three pedestrian surveys will cover 100 percent of the on-site and off-site project areas. Survey 1 will provide coverage of the Repository Surface Facility (RSF) area, which includes the Exploratory Shaft Facility (ESF) and two linear engineering design borehole (EDBH) seismic survey corridors. Survey 2 will provide coverage of a 39 km/sup 2/ (15 mi/sup 2/) area that includes the 23 km/sup 2/ (9 mi/sup 2/) Deaf Smith County site plus a 0.4 to 0.8 kM (1/4 to 1/2 mi) border area but excludes the area covered by Survey 1. Survey 3 will cover offsite geotechnical test areas, such as the locations of playa boreholes, deep playa wells, hydrologic tests, site foundation borings, and their access routes. The purpose of site documentation or recording is to address the project information needs for land use permits and approvals, engineering design support, and cultural resource evaluation for National Register of Historic Places eligibility. Site documentation will consist of gathering sufficient data on identified resources to complete Texas Natural Resource Information System (TNRIS). 7 refs., 3 figs.

  7. PACS: from planning to implementation for a new hospital facility

    NASA Astrophysics Data System (ADS)

    Meyers, Judith A.

    2001-08-01

    Planning PACS for a new hospital facility is an enormous undertaking with many varied user opinions. A pure objective-oriented planning approach was utilized along with a small PACS core planning team. The small PACS core team consisted of owner representation (administration), user representation (radiologists) and the PACS consultant. The overall PACS planning process was broken down into segments. Each segmented represented a key milestone for PACS planning with a set of clear objectives. The PACS core team followed a schedule beginning with preliminary PACS information moving forward to bid specification. An important element in PACS planning was the development of a PACS Component Location Matrix. The matrix was developed from the architectural plans for the new hospital and provided a guideline for everyone including architects and engineers. The matrix included CAD system identification number, location by architectural room number, room name, component network, remote diagnostics and storage. After a year of planning the PACS system and acceptance of vendor bid, the implementation process was ready to begin. The same small PACS core planning team remains intact for the implementation phase of the project.

  8. 77 FR 51739 - Approval and Promulgation of Implementation Plans; Tennessee; Regional Haze State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... Implementation Plan; Best Available Retrofit Technology for Eastman Chemical Company AGENCY: Environmental... Conservation (TDEC), on May 14, 2012, related to the Best Available Retrofit Technology (BART) requirements for... best system of continuous emissions control technology available and associated emissions reductions...

  9. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  10. Implementation plan for Bolivian Mineral Exploration Fund

    USGS Publications Warehouse

    Kirkemo, Harold

    1978-01-01

    Bolivia ranks second among world producers of tin and antimony, and first in bismuth production. Mineral exports in 1975 were valued at $314.2 million, nearly 60 percent of the value of all exports, and petroleum product exports totalled nearly $157 million, or 30 percent of the total. Tin accounted for 58 percent of the total value of metallic mineral exports. The central government derived about 19 percent of its total tax revenues in 1975 from the mining sector. The mining sector consists of the large, medium, and small mining subsectors, a classification established by the government. Individual operations are referred to as large, medium, or small depending upon the subsector into which they are classified. All large mining enterprises are owned and operated by a government corporation, COMIBOL; the medium and small operations are privately owned. COMIBOL's exports in 1975 were valued at $171.8 million or 70 percent of the total mineral exports; the medium mines accounted for $55.5 million or 23 percent, and the small mines for $17.5 million or 7 percent of the total. The combination of high operating costs, low productivity, inadequate ore reserves, and insufficient risk capital for exploration and development has led to the realization that there is an urgent need to improve the situation for mining in Bolivia. Proposals are being studied to revise the tax code, a program is underway to evaluate selected mineral deposits for possible exploration and development, and programs are under consideration to encourage minerals exploration. A minerals exploration plan is proposed which would offer technical and financial aid to various segments in the minerals field. A program, estimated to cost between $2 million and $2.5 million annually, and to be operated by a new agency in the Ministry of Mining and Metallurgy, is outlined.

  11. Update of the Used Fuel Dispositon Campaign Implementation Plan

    SciTech Connect

    McMahon, Kevin A.; Bragg-Sitton, Shannon; Mackinnon, Robert James; Saltzstein, Sylvia J.; Sorenson, Ken B.; Swift, Peter N.; Birkholzer, Jens T.

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  12. Update of the used fuel disposition Campaign Implementation Plan

    SciTech Connect

    Birkholzer, Jens; MacKinnon, Robert; McMahon, Kevin; Saltzstein, Sylvia; Sorenson, Ken; Swift, Peter

    2014-09-01

    This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  13. High performance computing and communications: FY 1996 implementation plan

    SciTech Connect

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  14. RCRA implementation plan (RIP): Fiscal years 1996--1997

    SciTech Connect

    1995-05-01

    The report defines the national policy and strategic goals and priority activities for the RCRA solid and hazardous waste program. Includes both changes and clarifications to the fiscal year 1994 RCRA implementation plan and the fiscal year 1995 addendum. It provides additional guidance in waste minimization, corrective action, state grants, beginning of the year plans, Indian programs, environmental justice, information management, state authorization, permitting/closure, and subtitle D activities.

  15. Planning, implementing, and using a virtual reference service.

    PubMed

    MacDonald, Marlyse H

    2003-01-01

    Virtual reference (VR) can be a successful vehicle for libraries if there is a demonstrated need by the user base for such a service and if the library staff believes in, accepts, and plans thoroughly for the concept. This article focuses on the experiences of the Duke University Medical Center Library (DUMCL) in planning, implementing, and using a virtual reference service utilizing LSSI's Virtual Reference Desk (VRD) Software.

  16. Integrating Clinical Practice Guidelines into Daily Practice: Impact of an Interactive Workshop on Drafting of a Written Action Plan for Asthma Patients

    ERIC Educational Resources Information Center

    Labelle, Martin; Beaulieu, Michele; Renzi, Paolo; Rahme, Elham; Thivierge, Robert L.

    2004-01-01

    Introduction: Written action plans (WAPs) are instructions that enable asthmatics to manage their condition appropriately and are recommended by current asthma clinical practice guidelines (CPGs). However, general practitioners (GPs) rarely draft WAPs for their patients. An interactive, case-based workshop for asthma, combined with an objective…

  17. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  18. 76 FR 4360 - Draft Guidance for Industry: Questions and Answers Regarding Implementation of the Menu Labeling...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... will minimize uncertainty and confusion among all interested persons. DATES: The withdrawal is... implementing section 4205 will minimize uncertainty and confusion among all interested persons. The Agency...

  19. Development and implementation of an interdisciplinary plan of care.

    PubMed

    Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff

    2005-01-01

    In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.

  20. Radioactive waste isolation in salt: Peer review of the Golder Associates draft test plan for in situ testing in an exploratory shaft in salt

    SciTech Connect

    Hambley, D.F.; Mraz, D.Z.; Unterberter, R.R.; Stormont, J.C.; Neuman, S.P.; Russell, J.E.; Jacoby, C.H.; Hull, A.B.; Brady, B.H.G.; Ditmars, J.D.

    1987-01-01

    This report documents the peer review conducted by Argonne National Laboratory of a document entitled ''Draft Test Plan for In Situ Testing in an Exploratory Shaft in Salt,'' prepared for Battelle Memorial Institute's Office of Nuclear Waste Isolation by Golder Associates, Inc. In general, the peer review panelists found the test plan to be technically sound, although some deficiencies were identified. Recommendations for improving the test plan are presented in this review report. A microfiche copy of the following unpublished report is attached to the inside back cover of this report: ''Draft Test Plan for In Situ Testing in an Exploratory Shaft in Salt,'' prepared by Golder Associates, Inc., for Office of Nuclear Waste Isolation, Battelle Memorial Institute, Columbus, Ohio (March 1985).

  1. Discharge Planning in Acute Care Hospitals in Israel: Services Planned and Levels of Implementation and Adequacy

    ERIC Educational Resources Information Center

    Auslander, Gail K.; Soskolne, Varda; Stanger, Varda; Ben-Shahar, Ilana; Kaplan, Giora

    2008-01-01

    This study aimed to examine the implementation, adequacy, and outcomes of discharge planning. The authors carried out a prospective study of 1,426 adult patients discharged from 11 acute care hospitals in Israel. Social workers provided detailed discharge plans on each patient. Telephone interviews were conducted two weeks post-discharge. Findings…

  2. 76 FR 69927 - Approval of Air Quality Implementation Plans; California; South Coast; Attainment Plan for 1997...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ...EPA is approving in part and disapproving in part state implementation plan (SIP) revisions submitted by California to provide for attainment of the 1997 fine particulate matter (PM2.5) national ambient air quality standards in the Los Angeles-South Coast area (South Coast). These SIP revisions are the South Coast 2007 Air Quality Management Plan (South Coast 2007 AQMP) (revised......

  3. Environmental regulatory compliance plan, Deaf County site, Texas: Draft revision 1

    SciTech Connect

    Not Available

    1987-12-14

    The DOE is committed to conduct its operation in an environmentally safe and sound manner and comply with the letter and spirit of applicable environmental statues and regulations. These objectives are codified in DOE order N 5400.2, ''Environmental Policy Statement.'' This document, the Deaf Smith County site (Texas) Environmental Regulatory Compliance Plam (ERCP), is one means of implementing that policy. The ERCP describes the environmental regulatory requirements applicable to the Deaf Smith County site (Texas), and presented the framework within which the Salt Repository Project Office (SRPO) will comply with the requirements. The plan also discusses how DOE will address State and local environmental requirements. To achieve this purpose the ERCP will be developed in phases. This version of the ERCP is the first phase in the delopment of the ERCP. It represents the Salt Repository Project Office's understanding of environmental requirements for the site characterization phase of repository development. After consultation with the appropriate federal and state agencies and affected Indian tribes, the ERCP will be updated to reflect the results of consultation with these agencies and affected Indian tribes. 6 refs., 38 figs.

  4. 2016-2020 Strategic Plan and Implementing Framework

    SciTech Connect

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  5. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  6. 76 FR 62002 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from Motor Vehicle...--Submitted Rules Local Rule Rule title Amended Submitted SJVUAPCD 4612 Motor Vehicle and Mobile 10/21/10 4/5...

  7. 40 CFR 52.2636 - Implementation plan for regional haze.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Compliance and Environmental Justice, U.S. Environmental Protection Agency, Region 8, Mail Code 8ENF-AT, 1595... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Implementation plan for regional haze. 52.2636 Section 52.2636 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  8. 49 CFR 37.143 - Paratransit plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Paratransit plan implementation. 37.143 Section 37.143 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Paratransit as a Complement to Fixed Route Service § 37.143 Paratransit...

  9. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  10. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  11. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  12. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  13. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  14. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  15. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  16. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  17. Planning for Implementation of Section 504 at Colleges and Universities.

    ERIC Educational Resources Information Center

    Mistler, Sharon

    Included in the discussion of how colleges and universities can plan for the implementation of Section 504 of the 1973 Rehabilitation Act (which gives handicapped people equal access to higher education) are an explanation of Subpart E of the Act, a definition of the handicapped community, and a list of services that should be provided for them on…

  18. 77 FR 24160 - Revisions to the Hawaii State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... AGENCY 40 CFR Part 52 Revisions to the Hawaii State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Hawaii State... approved into the Hawaii SIP in 1983. DATES: Any comments on this proposal must arrive by May 23, 2012...

  19. The Planning, Implementation, and Movement of an Academic Library Collection.

    ERIC Educational Resources Information Center

    Kurkul, Donna Lee

    1983-01-01

    Discusses methodology, logistics, and time/cost study of planning, implementation, and relocation of 682,810 volume Smith College Library collection into its newly constructed and renovated facility. Call number sequence location, collection movement phasing and formulas for sequence distribution, and personnel requirements are noted. Elementary…

  20. TTIP: Texas Teacher Internship Program: 1995 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    In 1989 the Texas Alliance for Science, Technology and Mathematics Education began placing teachers of all levels at industry sites as part of its Texas Teacher Internship Program. In 1995, 15 teachers interned at 11 sites. Each teacher was required to develop a curriculum implementation plan which was to illustrate how they would translate the…