Science.gov

Sample records for draft implementation plan

  1. 76 FR 47271 - Implementation of Scientific Integrity Principles: Draft Plan for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Implementation of Scientific Integrity Principles: Draft Plan for Public Comment AGENCY: National Science Foundation. ACTION: National Science Foundation (NSF) Implementation of Scientific Integrity...

  2. 76 FR 5203 - Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... National Park Service Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades National Park Service Complex; Chelan, Skagit, and Whatcom Counties, WA AGENCY: National Park Service, Interior. ACTION: Notice of extension of public comment period. SUMMARY: The...

  3. 75 FR 43528 - Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... HUMAN SERVICES Office of the Secretary Seeking Public Comment on Draft National Health Security Strategy... achieve national health security and to implement the first quadrennial National Health Security Strategy... the National Health Security Strategy of the United States of America (2009) the U.S. Government...

  4. Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs. Draft revision

    SciTech Connect

    Peterson, G.L.

    1993-11-18

    Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS`s program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives.

  5. Bonneville Power Administration, Fish and Wildlife Implementation Plan Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2001-06-22

    Despite the efforts of BPA and other regional entities in the Pacific Northwest, some species of fish and wildlife continue to decline. Reasons for the lack of success include: different groups have different values and priorities, there is no clear scientific answer, and there are conflicting directives and jurisdictions. The absence of a comprehensive and coordinated planning approach has caused inefficiencies in implementation of mitigation and recovery efforts, as well as their funding. On behalf of the Federal Columbia River Power System, BPA funds a large share of the regional efforts. BPA needs a comprehensive and consistent policy to guide the implementation and funding of its fish and wildlife mitigation and recovery efforts. BPA reviewed the many ongoing processes, identified key issues, and developed alternative policy directions based on alternatives developed by existing initiatives in the region. BPA examined five alternative Policy Directions (Natural Focus, Weak Stock Focus, Sustainable Use, Strong Stock Focus, and Commerce Focus) in relationship to continuing the Status Quo, or ''no action'', approach. The EIS evaluates the environmental consequences of BPA's implementation and funding of sample actions that could emerge from any of the policy directions. BPA does not intend to unilaterally select a Policy Direction for the region. Instead, this EIS provides an analysis of the full range of regional alternatives so that a timely funding and implementation strategy may proceed regardless of the alternative policy that ultimately is chosen--whether by design or by default. The BPA Administrator's initial decision, as well as future tiered decisions, will rely on the environmental analysis and the comparison of the alternatives against the purposes for action. The decisions will consider BPA's fish and wildlife responsibilities, as well as the agency's business responsibilities as a Federal Power Marketing Agency and its responsibility to provide

  6. 77 FR 15052 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... will inform the preparation of the final plan. Per our prior notice, which was published at 77 FR 2514... Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and...

  7. Draft Transportation Institutional Plan

    SciTech Connect

    Not Available

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab.

  8. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    SciTech Connect

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support

  9. Business Plan in Brief : Draft.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  10. Draft Mission Plan Amendment

    SciTech Connect

    1991-09-01

    The Department of Energy`s Office Civilian Radioactive Waste Management has prepared this document to report plans for the Civilian Radioactive Waste Management Program, whose mission is to manage and dispose of the nation`s spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and of workers and the quality of the environment. The Congress established this program through the Nuclear Waste Policy Act of 1982. Specifically, the Congress directed us to isolate these wastes in geologic repositories constructed in suitable rock formations deep beneath the surface of the earth. In the Nuclear Waste Policy Amendments Act of 1987, the Congress mandated that only one repository was to be developed at present and that only the Yucca Mountain candidate site in Nevada was to be characterized at this time. The Amendments Act also authorized the construction of a facility for monitored retrievable storage (MRS) and established the Office of the Nuclear Waste Negotiator and the Nuclear Waste Technical Review Board. After a reassessment in 1989, the Secretary of Energy restructured the program, focusing the repository effort scientific evaluations of the Yucca Mountain candidate site, deciding to proceed with the development of an MRS facility, and strengthening the management of the program. 48 refs., 32 figs.

  11. Final Draft Strategic Marketing Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-02-01

    The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

  12. Drafting.

    ERIC Educational Resources Information Center

    Hughes, Larry R.

    This guide to teaching drafting, one in a series of instructional materials for junior high industrial arts education, is designed to assist teachers as they plan and implement new courses of study and as they make revisions and improvements in existing courses in order to integrate classroom learning with real-life experiences. This drafting…

  13. 76 FR 65744 - Draft Environmental Assessment and Draft Habitat Conservation Plan for Lower Colorado River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Fish and Wildlife Service Draft Environmental Assessment and Draft Habitat Conservation Plan for Lower... Species Act of 1973, as amended. The applicant has completed a draft Habitat Conservation Plan (DHCP) as... Transmission Services Corporation (LCRA; applicant); and 2. LCRA has developed a draft habitat...

  14. 75 FR 6696 - Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... estimate time and cost for implementing the measures needed for recovery. The Draft Recovery Plan for Tidal... allows us to better focus our recovery strategy. The historic distribution of the California clapper rail... draft recovery plan due to its colocation with Suaeda californica in Morro Bay. Recovery strategies...

  15. India's draft National Health Policy, 2015: Improving policy to implementation effectiveness.

    PubMed

    Menabde, Nata; Lahariya, Chandrakant

    2015-01-01

    As the Government of India is working on drafting a new National Health Policy, developing national health accounts, and planning for a "health assurance mission," this opportunity has the potential to transform health status of millions of Indians and achieve universal health coverage. The draft of new National Health Policy of India was put in public domain for comments in early 2015. This editorial reviews the draft National Health Policy 2015 and proposes a few steps to improve implementation effectiveness.

  16. 77 FR 5528 - Trust Land Consolidation Draft Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... Office of the Secretary Trust Land Consolidation Draft Plan AGENCY: Office of the Secretary, Interior... fractional interests in these lands. We are seeking comments on the draft plan for accomplishing these goals. DATES: Submit comments by March 19, 2012. ADDRESSES: Send comments on the draft plan to: Elizabeth...

  17. 77 FR 17091 - Trust Land Consolidation Draft Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... land consolidation draft plan (77 FR 5528) and requesting comments by March 19, 2012. This notice... Office of the Secretary Trust Land Consolidation Draft Plan AGENCY: Office of the Secretary, Interior... commenting on the Cobell Land Consolidation Program Draft Plan (also known as the Trust Land...

  18. In Brief: U.S. ocean research plan drafted

    NASA Astrophysics Data System (ADS)

    Zielinski, Sarah

    2006-04-01

    TheU.S. Committee on Ocean Policy, which coordinates ocean-related activities throughout the federal government, released an ocean research priorities draft plan and implementation strategy on 27 March for a 45-day public comment period. The plan is intended to set priorities for ocean science and technology across a wide range of societal interests. The plan covers seven themes: enhancing human health, improving ecosystem health, sustaining natural resources, promoting marine operations, the ocean's role in climate change and variability, mitigating effects of natural hazards, and improving quality of life. Under each theme, the plan identifies challenges, and research, infrastructure, and technical needs.

  19. Implementing a Capital Plan.

    ERIC Educational Resources Information Center

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  20. 76 FR 51394 - DRAFT General Management Plan and Draft Environmental Impact Statement, Biscayne National Park, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... National Park Service DRAFT General Management Plan and Draft Environmental Impact Statement, Biscayne National Park, FL AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft... Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces...

  1. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... National Park Service Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National Historic Site, North Carolina AGENCY: National Park Service, Interior. ACTION: Notice of... National Park Service announces the availability of a Draft Environmental Impact Statement for the...

  2. 78 FR 47003 - Draft National Spatial Data Infrastructure Strategic Plan; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ....S. Geological Survey Draft National Spatial Data Infrastructure Strategic Plan; Comment Request... Geographic Data Committee (FGDC) is soliciting public comments on the draft strategic plan for the National Spatial Data Infrastructure (NSDI). The draft strategic plan, along with instructions for...

  3. Implementing College Strategic Plans.

    ERIC Educational Resources Information Center

    Further Education Development Agency, London (England).

    This document, which is intended for individuals responsible for planning and management at further education (FE) colleges, summarizes the factors that contributed to or obstructed implementation of strategic plans in 10 FE colleges in England and Wales in 1994-95. It presents key questions and illustrations that FE colleges can use for…

  4. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Environmental Impact Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska... Amendment, 4700 BLM Road, Anchorage, Alaska 99507. Copies of the Draft RMP Amendment/Draft EIS are available... Area is located in southeast Alaska, and consists of approximately 320,000 acres of BLM-managed...

  5. Strategic implementation plan

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  6. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  7. 77 FR 11116 - Draft National Plan To Address Alzheimer's Disease

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... HUMAN SERVICES Draft National Plan To Address Alzheimer's Disease AGENCY: Office of the Assistant.... SUMMARY: HHS is soliciting public input on the draft National Plan to Address Alzheimer's Disease, which... Alzheimer's disease. Coordinate Alzheimer's disease research and services across all federal...

  8. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... the Federal Register of May 23, 2012, in FR Doc. 2012-12462, make the following corrections: 1. On... Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION: Notice; second correction..., concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to...

  9. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  10. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  11. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  12. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  13. 76 FR 62087 - Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Lizard, Texas AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability; announcement... application includes the draft Texas Conservation Plan for the Dunes Sagebrush Lizard (TCP). The draft TCP... Service (Service) and the Applicant for the dunes sagebrush lizard (Sceloporus arenicolus) throughout...

  14. 77 FR 42756 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Incidental Take of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Texas troglobitic water slater (Lirceolus smithii) in case they are listed during the duration of the..., and the Edwards Aquifer Authority; San Antonio Water Systems; City of New Braunfels, Texas; City of... Fish and Wildlife Service Draft Environmental Impact Statement and Draft Habitat Conservation Plan...

  15. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... demands on the resources of the public lands; changing policies and emphasis on the management of public... Bureau of Land Management Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION:...

  16. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  17. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  18. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  19. 78 FR 70571 - Notice of Availability of the Oregon Greater Sage-Grouse Draft Land Use Plan Amendments and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... Bureau of Land Management Notice of Availability of the Oregon Greater Sage-Grouse Draft Land Use Plan Amendments and Draft Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION... (BLM) has prepared Oregon Greater Sage-Grouse Draft Land Use Plan (LUP) Amendments and a...

  20. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice. SUMMARY: The Denali Commission....C. 3121). The Denali Commission Act requires that the Commission develop proposed work plans for future spending and that the annual Work Plan be published in the Federal Register, providing...

  1. TRUPACT-1 implementation plan

    SciTech Connect

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  2. 77 FR 56671 - Draft Shoreline Restoration Management Plan and Environmental Impact Statement for Indiana Dunes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... National Park Service Draft Shoreline Restoration Management Plan and Environmental Impact Statement for... Restoration Management Plan and Environmental Impact Statement, Indiana Dunes National Lakeshore, Indiana. DATES: The Draft Shoreline Restoration Management Plan and Environmental Impact Statement (SRMP) will...

  3. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... National Park Service Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement... Availability of the Draft Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan... Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan for Biscayne National Park,...

  4. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Action Plan--A Public Health Action Plan...), Department of Health and Human Services (DHHS). ACTION: Notice of availability and request for public comment... Human Services (HHS) is publishing this notice requesting public comment on the draft A Public...

  5. 12 CFR 516.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable...

  6. Conduct of operations implementation plan

    SciTech Connect

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  7. 78 FR 69127 - Supplemental Draft Environmental Impact Statement/General Management Plan, Biscayne National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... National Park Service Supplemental Draft Environmental Impact Statement/General Management Plan, Biscayne National Park, Florida AGENCY: National Park Service, Interior. ACTION: Notice of Availability of a Supplemental Draft Environmental Impact Statement for the General Management Plan, Biscayne National...

  8. 77 FR 1717 - Notice of Availability; Draft Springfield Plateau Regional Restoration Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Fish and Wildlife Service Notice of Availability; Draft Springfield Plateau Regional Restoration Plan... Department of Natural Resources, have written a Draft Springfield Plateau Regional Restoration Plan and... Resource Damage Assessment and Restoration (NRDAR) regulations and NEPA regulations. DATES: To...

  9. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... National Park Service Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park....

  10. 76 FR 59732 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... notice in the Federal Register (76 FR 41808) that announced that Oncor Electric Delivery Company, LLC... Oncor Electric Delivery Facilities in 100 Texas Counties AGENCY: Fish and Wildlife Service, Interior... draft Oncor Electric Delivery Company, LLC, habitat conservation plan (HCP). Due to an inadvertent...

  11. 75 FR 63851 - Draft General Management Plan and Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... planning and management. DATES: The National Park Service will accept comments on the Draft GMP/ EIS from... National Park Service Draft General Management Plan and Environmental Impact Statement, Hampton National... Availability of the Draft General Management Plan and Environmental Impact Statement for Hampton...

  12. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... National Park Service Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National... comment period for Draft Environmental Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan...

  13. 78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety... potentially affected parties on its draft revised strategic plan. DNFSB will consider all comments received as..., Acting Deputy General Manager, 202-694-7060. SUPPLEMENTARY INFORMATION: This draft strategic plan...

  14. 78 FR 72873 - Availability of 2014-2018 Draft Strategic Plan and Request for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... Availability of 2014-2018 Draft Strategic Plan and Request for Public Comment AGENCY: Department of Energy (DOE). ACTION: Notice of availability of DOE's Draft Strategic Plan and request for comment. SUMMARY: The Department of Energy (DOE) invites the public to comment on the draft DOE 2014-2018 Strategic Plan....

  15. 76 FR 9529 - Migratory Birds; Draft Eagle Conservation Plan Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... development of facilities to generate electricity from wind turbines has increased dramatically in the range... wind turbines. Because of this risk, many of the current and planned wind facilities require permits... Fish and Wildlife Service 50 CFR Part 22 RIN 1018-AX53 Migratory Birds; Draft Eagle Conservation...

  16. Environmental implementation plan

    SciTech Connect

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  17. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... the draft, A Public Health Action Plan to Combat Antimicrobial Resistance (76 FR 14402). Written and... spectrum of AR issues, addressing resistance in a wide range of pathogens (bacteria, viruses, fungi,...

  18. 77 FR 47435 - Prime Hook National Wildlife Refuge, Sussex County, DE; Draft Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... Fish and Wildlife Service Prime Hook National Wildlife Refuge, Sussex County, DE; Draft Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION... conservation plan and draft environmental impact statement (draft CCP/EIS) for Prime Hook National...

  19. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... National Park Service Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida AGENCY: National Park Service, Interior. ACTION: Notice of Availability. SUMMARY... National Park Service (NPS) announces the availability of the Draft Environmental Impact Statement...

  20. Review of the Draft 2014 Science Mission Directorate Science Plan

    NASA Technical Reports Server (NTRS)

    2013-01-01

    At the request of NASA's Science Mission Directorate (SMD), the National Research Council's (NRC's) Space Studies Board (SSB) initiated a study to review a draft of the SMD's 2014 Science Plan. The request for this review was made at a time when NASA is engaged in the final stages of a comprehensive, agency-wide effort to develop a new strategic plan and at a time when NASA's budget is under considerable stress. SMD's Science Plan serves to provide more detail on its four traditional science disciplines-astronomy and astrophysics, solar and space physics (also called heliophysics), planetary science, and Earth remote sensing and related activities-than is possible in the agency-wide Strategic Plan. In conducting its review of the draft Science Plan, the Committee on the Assessment of the NASA Science Mission Directorate 2014 Science Plan was charged to comment on the following specific areas: (1) Responsiveness to the NRC's guidance on key science issues and opportunities in recent NRC reports; (2) Attention to interdisciplinary aspects and overall scientific balance; (3) Identification and exposition of important opportunities for partnerships as well as education and public outreach; (4) Integration of technology development with the science program; (5) Clarity on how the plan aligns with SMD's strategic planning process; (6) General readability and clarity of presentation; and (7) Other relevant issues as determined by the committee. The main body of the report provides detailed findings and recommendations relating to the draft Science Plan. The highest-level, crosscutting issues are summarized here, and more detail is available in the main body of the report.

  1. 78 FR 73555 - Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early Restoration Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... announced in the May 6, 2013 Federal Register notice (78 FR 26319), and the document now proposes these 28... Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early Restoration Plan and Draft Early Restoration Programmatic Environmental Impact Statement AGENCY: Interior. ACTION: Notice of...

  2. Draft of the PHENIX Management Plan

    SciTech Connect

    Not Available

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  3. 78 FR 56271 - FY 2014-2020 Draft VA Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-12

    ... AFFAIRS FY 2014-2020 Draft VA Strategic Plan AGENCY: Department of Veterans Affairs. ACTION: Notice of... availability of the FY 2014-2020 Draft VA Strategic Plan (Strategic Plan) for public review and comment, as...). The Strategic Plan provides the Department's long-term direction and places a stronger emphasis...

  4. Draft Automatic Data Acquisition System Plan

    SciTech Connect

    Not Available

    1987-04-01

    This Automatic Data Acquisition System (ADAS) Plan has been prepared in support of the requirement for detailed site characterization of the Deaf Smith County candidate repository site in salt, and describes the data acquisition system which will be used for unattended data collection from the geotechnical instrumentation installed at the site. Section 1.1 discusses the programmatic background to the plan, Section 1.2 presents the scope and purpose of the plan, and the organization of the document is given in Section 1.3. 31 refs., 34 figs., 8 tabs.

  5. Special Libraries: Planning and Operation; Preliminary Draft.

    ERIC Educational Resources Information Center

    Weiner, Betty H.

    An attempt is made in this report to combine a pragmatic how-to-do-it approach with suggestions for applying system analysis techniques for planning and operating a small special library or information center. A special library is defined as a library in a commercial, industrial, governmental or non-profit organization such as research…

  6. 75 FR 14623 - Notice of Availability of the Draft Imperial Sand Dunes Recreation Area Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ...; renewable energy; water resources; geology and soils; mineral resources; socioeconomics; public health and... Management Plan and Draft Environmental Impact Statement and Associated Amendment to the California Desert... (ISDRA) and associated plan amendment to the California Desert Conservation Area (CDCA) Plan in...

  7. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... COMMISSION Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan AGENCY: Nuclear....S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and strategic objective, which...

  8. 78 FR 26616 - Draft NOAA Five Year Research and Development Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... NOAA Five Year Research and Development Plan AGENCY: National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Draft NOAA Five Year Research and Development Plan for Public Review. SUMMARY: NOAA's draft Five Year Research and Development Plan is available for...

  9. Draft safety review plan for accelerator production of tritium (APT) project

    SciTech Connect

    1997-07-01

    The purpose of this ``living`` Safety Review Plan (SRP) is to describe the products and processes that will be followed to conduct a systematic review of the Accelerator Production of Tritium (APT) Facility Preliminary Safety Analysis Report (PSAR), and subsequently to prepare a draft Safety Evaluation Report (SER) on the PSAR. This plan is prepared for and will be implemented by the APT Independent Safety Review Committee (ISRC) over the period July 1, 1997 through September 30, 1998, in accordance with provisions established in DOE-STD-1104-96. A core team of DOE, INEEL, and AMPARO Corporation engineers and scientists will prepare the initial draft SER with assistance from other ISRC team members on an as needed basis. Guidelines for preparing the draft SER are presented in Section 7 of this SRP. The PSAR reviews will focus exclusively on safety. The ever-present two-part question will be: Does the subject matter have safety significance? If so, does the APT structural, system, component, and/or process engineering design ensure an acceptable margin of safety? The APT mission, efficiency, and cost are not considerations of this plan. A more detailed discussion of the review philosophy is presented in Section 5 of this SRP.

  10. DWPF waste form compliance plan (Draft Revision)

    SciTech Connect

    Plodinec, M.J.; Marra, S.L.

    1991-01-01

    The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970's, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

  11. DWPF waste form compliance plan (Draft Revision)

    SciTech Connect

    Plodinec, M.J.; Marra, S.L.

    1991-12-31

    The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970`s, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

  12. Draft Strategic Laboratory Missions Plan. Volume II

    SciTech Connect

    1996-03-01

    This volume described in detail the Department`s research and technology development activities and their funding at the Department`s laboratories. It includes 166 Mission Activity Profiles, organized by major mission area, with each representing a discrete budget function called a Budget and Reporting (B & R) Code. The activities profiled here encompass the total research and technology development funding of the laboratories from the Department. Each profile includes a description of the activity and shows how the funding for that activity is distributed among the DOE laboratories as well as universities and industry. The profiles also indicate the principal laboratories for each activity, as well as which other laboratories are involved. The information in this volume is at the core of the Strategic Laboratory Mission Plan. It enables a reader to follow funds from the Department`s appropriation to a specific activity description and to specific R & D performing institutions. This information will enable the Department, along with the Laboratory Operations Board and Congress, to review the distribution of R & D performers chosen to execute the Department`s missions.

  13. Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  14. Puget Sound area electric reliability plan. Draft environmental impact statement

    SciTech Connect

    Not Available

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  15. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  16. Planning for Program Implementation -- A Process Guide. Instructional Planning Series.

    ERIC Educational Resources Information Center

    Brokes, A. L.; Jenks, C. L.

    This guide presents tasks a planning group should consider when implementing a program. Although implementation may not occur in this sequence, the total array of implementation tasks includes selecting a planning group leader, defining the problem, selecting objectives, designing the program, developing an implementation plan, developing an…

  17. 75 FR 57056 - Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... Bureau of Land Management Notice of Availability of the Draft Buffalo Resource Management Plan Amendment... Bureau of Land Management (BLM) has prepared a Draft Resource Management Plan Amendment and Environmental..._Crk_WYMail@blm.gov . Fax: (307) 684-1122. Mail: Buffalo RMP Amendment/Fortification Creek EA,...

  18. 77 FR 12323 - Draft Environmental Impact Statement for the General Management Plan, Buck Island Reef National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... National Park Service Draft Environmental Impact Statement for the General Management Plan, Buck Island Reef National Monument, Virgin Islands AGENCY: National Park Service, Interior. ACTION: Notice of Availability of a Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Buck...

  19. 76 FR 79708 - Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... National Park Service Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation Area, CA AGENCY: National Park Service, Interior. ACTION: Notice of Extended Public Comment Period for Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation...

  20. 77 FR 66626 - Deepwater Horizon Oil Spill; Draft Early Restoration Plan and Environmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Deepwater Horizon Oil Spill; Draft Early Restoration Plan and Environmental Review AGENCY: Interior. ACTION... (OPA), the National Environmental Policy Act (NEPA), and the Framework Agreement for Early Restoration... trustee agencies (Trustees) have prepared a Phase II Draft Early Restoration Plan and Environmental...

  1. 76 FR 27087 - Draft Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Park Service Draft Environmental Impact Statement for the Winter Use Plan, Yellowstone National... Draft Environmental Impact Statement (DEIS) for a Winter Use Plan for Yellowstone National Park, located..., Yellowstone National Park, P.O. Box 168, Yellowstone National Park, Wyoming 82190. If you wish to comment...

  2. 75 FR 47346 - Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-05

    ... Draft Strategic Plan for FY 2010-2015 AGENCY: United States Department of the Treasury. ACTION: Notice... draft strategic plan for fiscal years 2010-2015 is available for public review and comment. The Government Performance and Results Act of 1993 (GPRA) requires Federal agencies to establish a strategic...

  3. 76 FR 51395 - Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... National Park Service Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP... Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral National... 1969 the NPS announces the availability of a DEIS/GMP for Canaveral National Seashore, Florida....

  4. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... National Park Service General Management Plan, Draft Environmental Impact Statement, Big Thicket National... announces the availability of a Draft Environmental Impact Statement for the General Management Plan, Big... Environmental Impact Statement from the public for 60 days after the date the Environmental Protection...

  5. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... National Park Service General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation Area and Alibates Flint Quarries National Monument, Texas AGENCY: National Park Service, Interior... Impact Statement for the General Management Plan, Lake Meredith National Recreation Area and......

  6. 78 FR 57875 - Notice of Availability of the Draft Southeast Missouri Ozarks Regional Restoration Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... Restoration Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... Department of Natural Resources have written a Draft Southeast Missouri Regional Restoration Plan and... Resource Damage Assessment and Restoration (NRDAR) regulations and NEPA regulations. DATES:...

  7. Bow-corridor local integrated resource plan: Draft plan

    SciTech Connect

    Not Available

    1990-01-01

    This plan presents the Government of Alberta's resource management policy for public lands and resources within the Bow Corridor. Resource potentials and opportunities for development are identified to assist in the economic progress of the province. The plan includes identification of its purpose and scope and the context in which it is presented; and resource management objectives and guidelines for ecological and aesthetic resources, fisheries, forests, historical resources, minerals, range land, settlement, tourism/recreation, water and watersheds and wildlife.

  8. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    SciTech Connect

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs.

  9. 78 FR 55257 - Request for Comments on the Draft Departmental Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... HUMAN SERVICES Office of the Secretary Request for Comments on the Draft Departmental Strategic Plan for... on the draft strategic plan FY 2014-2018. SUMMARY: The Department of Health and Human Services (HHS) is seeking public comment on its draft Strategic Plan for fiscal years 2014-2018. DATES:...

  10. 78 FR 14791 - Notice of Issuance of Exposure Draft on Implementation Guidance on General Property, Plant, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ..., Plant, and Equipment Cost Accumulation, Assignment, and Allocation. The Exposure Draft is available on... ADVISORY BOARD Notice of Issuance of Exposure Draft on Implementation Guidance on General Property, Plant, and Equipment Cost Accumulation, Assignment, and Allocation AGENCY: Federal Accounting...

  11. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  12. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Implementation plan. 820.65 Section 820.65 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES Exemption Relief § 820.65 Implementation plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an...

  13. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  14. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  15. 76 FR 44013 - Draft Guidance for Industry: Implementation of Acceptable Full-Length and Abbreviated Donor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... HUMAN SERVICES Food and Drug Administration Draft Guidance for Industry: Implementation of Acceptable Full- Length and Abbreviated Donor History Questionnaires and Accompanying Materials for Use in Screening Donors of Source Plasma; Availability AGENCY: Food and Drug Administration, HHS. ACTION:...

  16. 77 FR 8885 - Draft Guidance for Industry on Biosimilars: Questions and Answers Regarding Implementation of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... HUMAN SERVICES Food and Drug Administration Draft Guidance for Industry on Biosimilars: Questions and Answers Regarding Implementation of the Biologics Price Competition and Innovation Act of 2009; Availability AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The Food and...

  17. Individualized Career Plan (ICP): Implementation Manual.

    ERIC Educational Resources Information Center

    Batsche, Catherine; And Others

    This implementation manual was designed to assist local education agency personnel implement the individualized career plan (ICP) concept in high schools. Questions commonly asked about the ICP are answered. Guidelines are then provided for implementing the four stages of the process: planning, developing, implementing, and evaluating/refining.…

  18. Draft Site Treatment Plan (DSTP), Volumes I and II

    SciTech Connect

    D`Amelio, J.

    1994-08-30

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilities is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.

  19. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    SciTech Connect

    1994-08-31

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  20. NESD CAE facility minimal implementation plan (June 1982)

    SciTech Connect

    Ames, H. S.

    1983-08-04

    In conjunction with other divisions in the EE Department, the Nuclear Energy Systems Division is developing a Computer-Aided Engineering (CAE) capability. Some of our needs in areas such as drafting, PC design, and IC design can be satisfied with existing turnkey systems. Many of our other needs, including modeling, analysis, document management and communication, software development, project management, and project communication will require the gradual development of an expanded computing environment. The purpose of this document is to describe our initial plans to implement a CAE facility.

  1. Selecting and implementing an interactive Computer Aided Design Drafting/Manufacturing (CADD/M) system

    SciTech Connect

    Norton, F.J.

    1980-09-23

    Success with Interactive Computer-Aided Design Drafting/Manufacturing (CADD/M) depends upon management, users, and the system itself. If you are in a design and drafting environment, the thought of acquiring a CADD/M system will probably occur to you sometime in the very near future - if it hasn't already. Convincing yourself and your management of the benefits of such systems is but the first step. Evaluating and selecting one particular type of CADD/M system can turn out to be a complicated undertaking - not to mention somewhat frustrating. Procedures for selecting and successfully implementing a CADD/M system are outlined. INITIAL PREPARATION examines the techniques used to evaluate CADD/M systems including formation of an evaluation team, and application analysis. GRAPHICS EVALUATION describes the methods that can be used to test a CADD/M system, including benchmark drawings and specifications, human engineering considerations, and other evaluation criteria and general system configurations are also discussed. COMPUTER SYSTEM EVALUATION examines other factors in systems selection: programming, communications, documentation, and service. SYSTEM STARTUP addresses site preparation, people preparation, system acceptance, and operator, designer/drafter selection. Finally, operator, designer/drafter TRAINING and SYSTEM MANAGEMENT are discussed. This systematic approach wil help those contemplating the acquisition of CADD/M systems for their activities and will help minimize unplanned events and problem areas.Advanced planning in these areas is needed to ensure successful implementation of a CADD/M system. This in turn will lead to considerable cost savings and schedule improvements for an entire project, from initial design to final production. These are ambitious goals but easily realized if a logical and rational plan is adopted in the same manner as that used in a typical development program.

  2. 76 FR 53484 - Notice of Availability of the Draft Resource Management Plan/Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... Environmental Impact Statement (EIS) for the Lower Sonoran (LS) and Sonoran Desert National Monument (SDNM.... ADDRESSES: You may submit written comments related to the LS-SDNM Draft RMP/EIS by any of the following methods: E-mail: blm_az_ls_sdnm_plan@blm.gov . Fax: 623-580-5580. Mail or in person: BLM Phoenix...

  3. 78 FR 17714 - Notice of Availability of the HiLine District Draft Resource Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Bureau of Land Management Notice of Availability of the HiLine District Draft Resource Management Plan... Impact Statement (EIS) for the HiLine District in Montana and by this notice is announcing the opening of..., media releases, and/or mailings. ADDRESSES: You may submit comments related to the HiLine District...

  4. 75 FR 67149 - Request for Public Comment on the Draft 2010 National Nanotechnology Initiative Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ... TECHNOLOGY POLICY Request for Public Comment on the Draft 2010 National Nanotechnology Initiative Strategic... request comments from the public regarding the draft 2010 National Nanotechnology Initiative (NNI... Nanotechnology Initiative (NNI) Strategic Plan is the framework that underpins the nanotechnology work of the...

  5. 78 FR 5494 - Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... National Park Service Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith.../DEIS evaluates the impacts of four alternatives that address off-road vehicle (ORV) management in the...), the National Park Service (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the...

  6. 77 FR 11154 - Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ..., subsistence, travel management, water quality, lands with wilderness characteristics, and wildlife. The Draft... Bureau of Land Management Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental Impact Statement, Alaska AGENCY: Bureau of Land Management, Interior. ACTION: Notice...

  7. 77 FR 43808 - Supplement to the Draft Programmatic Restoration Plan and Programmatic Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... previous draft RP/PEIS was made available for public review on May 22, 2009 (74 FR 25735, pages 25735-5736... Restoration Plan and Programmatic Environmental Impact Statement AGENCY: National Marine Fisheries Service... case. The Trustee Council is providing notice that the Supplement to the Draft Programmatic...

  8. 76 FR 78016 - Deepwater Horizon Oil Spill; Draft Phase I Early Restoration Plan and Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ....S. Fish and Wildlife Service, Interior Deepwater Horizon Oil Spill; Draft Phase I Early Restoration... Environmental Policy Act (NEPA), and the Framework Agreement for Early Restoration Addressing Injuries Resulting...) have prepared a Draft Early Restoration Plan and Environmental Assessment (DERP/EA) describing...

  9. 75 FR 30849 - Notice of Availability of Draft General Management Plan/Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... availability of a draft General Management Plan/ Environmental Impact Statement (GMP/EIS) for Lincoln Home National Historic Site, Illinois. DATES: The draft GMP/EIS will remain available for public review for 60.... Environmental Protection Agency. Public meetings will be held during the 60-day review period on the GMP/EIS...

  10. 77 FR 46518 - Draft Resource Management Plan/General Plan Draft Environmental Impact Statement/Revised Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... Parks and Recreation (CDPR), as the California Environmental Quality Act State lead agency, have made available for public review and comment the San Luis Reservoir State Recreation Area Resource Management... California Department of Parks and Recreation was given the responsibility to plan, design,...

  11. 76 FR 20347 - Release of Draft Integrated Review Plan for the National Ambient Air Quality Standards for Lead

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... (75 FR 8934). The draft IRP is being made available for consultation with CASAC and for public comment... AGENCY Release of Draft Integrated Review Plan for the National Ambient Air Quality Standards for Lead... National Ambient Air Quality Standards for Lead (draft IRP). This document contains the plans for...

  12. 76 FR 10342 - Availability of Fiscal Years 2011-2016 Draft Strategic Plan and Request for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... Availability of Fiscal Years 2011-2016 Draft Strategic Plan and Request for Public Comment AGENCY: Department of Energy (DOE). ACTION: Notice of availability of DOE's Draft Strategic Plan and request for comment. SUMMARY: The Department of Energy (DOE) invites the public to comment on the draft DOE 2011 Strategic...

  13. 75 FR 4794 - Draft Revised Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... SAFETY BOARD Draft Revised Strategic Plan for FY 2010-2015 AGENCY: Defense Nuclear Facilities Safety... revised strategic plan. The Board will consider all comments received as a result of this outreach effort... plan will replace the Board's FY 2003-2009 Strategic Plan, dated November 17, 2003. Dated: January...

  14. 75 FR 52357 - Request for Comment: National Center for Complementary and Alternative Medicine Draft Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-25

    ... Alternative Medicine Draft Strategic Plan ACTION: Notice. SUMMARY: The National Center for Complementary and Alternative Medicine (NCCAM) is developing its third strategic plan and invites the public to provide comments... strategic plans, located on the NCCAM Web site at http://nccam.nih.gov/about/plans . The public is...

  15. LBNL Institutional Plan, FY 1996--2001. Draft

    SciTech Connect

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  16. Developing and Implementing a Marketing Plan.

    ERIC Educational Resources Information Center

    McCalmon, Byron G.

    1987-01-01

    A program focusing on recruitment of new freshmen at the University of Colorado at Boulder illustrates some major planning considerations in the development, implementation, and evaluation of a marketing plan. (MSE)

  17. 77 FR 76065 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ..., exotic species, grazing, hydrologic changes, invasive plants, pollution, and energy resource exploration... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan...-772-2374. SUPPLEMENTARY INFORMATION: Background Restoring an endangered or threatened animal or...

  18. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 1: Plenary Session

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Briefings from the plenary session of the conference on SSTAC/ARTS Review of the Draft Integrated Technology Plan (ITP) held on 24-28 Jun. 1991 are included. Viewgraphs from the presentations are included.

  19. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... National Oceanic and Atmospheric Administration Draft Management Plan and Environmental Assessment for... Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric Administration... National Oceanic and Atmospheric Administration (NOAA) designated Monitor National Marine Sanctuary...

  20. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... project consists of a 100-turbine wind-powered electric generation facility located in an approximately 80... Fish and Wildlife Service Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County,...

  1. Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000

    SciTech Connect

    1995-03-03

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

  2. 76 FR 64327 - Office of Oceanic and Atmospheric Research Draft Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... strategic direction for program and laboratory planning. DATES: Public comments are due by 5 p.m., EST... Strategic Plan AGENCY: Office of Oceanic and Atmospheric Research (OAR), National Oceanic and Atmospheric... public comment. SUMMARY: This notice announces that OAR's draft Strategic Plan (FY12- 18) is...

  3. 76 FR 16634 - Seal Beach National Wildlife Refuge, Orange County, CA; Draft Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... Federal Register notice of intent published on April 16, 2007 (72 FR 190160), two scoping meetings, two... plans (an Integrated Pest Management Program and a Mosquito Management Plan), as well as draft... mosquito monitoring and control would be guided by a Mosquito Management Plan. No changes to the...

  4. 76 FR 55939 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact Statement for the Lander Resource Management Plan Revision Project, Lander Field Office...: You may submit comments related to the Lander Resource Management Plan Revision Project by any of...

  5. An exploratory shaft facility in SALT: Draft shaft study plan

    SciTech Connect

    Not Available

    1987-03-01

    This draft Shaft Study Plan describes a program of testing and monitoring in the Exploratory Shafts of a candidate high-level nuclear waste repository site in Deaf Smith County, Texas. The purpose of the programs to assist with site characterization in support of a determination of site suitability for development as a repository design and performance assessment evaluations. The program includes a variety of geological, geophysical, geomechanical, thermomechanical, and geohydrological testing and monitoring. The program is presented as a series of separate studies concerned with geological, geomechanical, and geohydrological site characterization, and with evaluating the mechanical and hydrological response of the site to construction of the shafts. The various studies, and associated test or monitoring methods are shown. The procedure used in developing the test program has been to initially identify the information necessary to satisfy (1) federal, state, and local requirements, and (2) repository program requirements. These information requirements have then been assessed to determine which requirements can be addressed wholly or in significant part by monitoring and testing from within the shafts. Test methods have been identified to address specific information requirements. 67 refs., 39 figs., 31 tabs.

  6. Oil program implementation plan FY 1996--2000

    SciTech Connect

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  7. 78 FR 79004 - Notice of Availability of the Wyoming Greater Sage-Grouse Draft Land Use Plan Amendments and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... Bureau of Land Management Notice of Availability of the Wyoming Greater Sage-Grouse Draft Land Use Plan Amendments and Draft Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION... (BLM) and the US Forest Service (USFS) have prepared the Wyoming Greater Sage-Grouse Draft Land...

  8. Geothermal energy planning and communication for native Americans. Final report. Draft

    SciTech Connect

    Robertson, T.A.

    1982-03-30

    The purpose was to explore and develop geothermal energy resources on Indian lands. Activities included the following: (1) continued review of Indian communities and their potential for geothermal energy development; (2) introduced tribes to the availability of geothermal energy and removed the barriers to the implementation of this energy source; (3) provided information by telephone and by mailing packages of information; (4) published articles on geothermal energy development in the UIPA newsletter and supplied articles to other Indian publication; (5) conducted two seminars specific to geothermal energy development on Indian lands in western states; (6) carried out survey of Indian attitudes and opinions toward energy in general and geothermal energy in specific; (7) incorporated geothermal energy development information in Economic Development Administration sponsored tribal government management programs, and (8) developed draft written material addressing Indian planning problems and supporting their ability to affect a more productive working relationship with government agencies and reduced dependency.

  9. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  10. 78 FR 66948 - Request for Information on the Office of Disease Prevention Draft Strategic Plan for Fiscal Years...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... Draft Strategic Plan for Fiscal Years 2014-2018 SUMMARY: The purpose of this Request for Information (RFI) is to seek broad public input on the draft Strategic Plan for Fiscal Years (FY) 2014-2018 for the... the web- based form available at http://prevention.nih.gov/aboutus/strategic_plan/rfi.aspx ....

  11. 78 FR 65700 - Notice of Availability of the Utah Greater Sage-Grouse Draft Land Use Plan Amendments and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Bureau of Land Management Notice of Availability of the Utah Greater Sage-Grouse Draft Land Use Plan...) and U.S. Forest Service (USFS) have prepared a Utah Greater Sage-Grouse Draft Land Use Plan (LUP... land use planning process, the BLM and USFS will identify Greater Sage-Grouse preliminary...

  12. 75 FR 47859 - Availability of SBA Draft Strategic Plan for Fiscal Years 2011-2016 and Request for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... ADMINISTRATION Availability of SBA Draft Strategic Plan for Fiscal Years 2011- 2016 and Request for Public... strategic plans every three years and, in doing so, solicit the views and suggestions of those entities... on our draft Strategic Plan. DATES: Comments must be received by August 31, 2010. If comments...

  13. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... program, including: (1) The reduction fishery; (2) The reduction methodology; (3) The maximum reduction... subsidized program on the final development plan. The implementation plan will describe in detail all... methodology; (3) The maximum reduction cost; (4) The reduction-cost funding, if any, other than...

  14. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 12 2012-10-01 2012-10-01 false Implementation plan and implementation regulations. 600.1008 Section 600.1008 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MAGNUSON-STEVENS ACT PROVISIONS Fishing Capacity Reduction Framework §...

  15. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Management of Infertility. The draft plan can be found at http://www.regulations.gov Docket No. CDC-2012-0004... for the Prevention, Detection, and Management of Infertility, which was subsequently developed...

  16. 77 FR 52754 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... Fish and Wildlife Service Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within... coordination with our planning partners, intend to prepare the Midwest Wind Energy Multi-Species Habitat... include the conservation agencies for the eight states, The Conservation Fund, and the American...

  17. Questions to Consider When Reviewing Draft WIOA State Plans. WIOA Game Plan for Low-Income People

    ERIC Educational Resources Information Center

    Center for Law and Social Policy, Inc. (CLASP), 2016

    2016-01-01

    As states release draft Workforce Innovation and Opportunity Act (WIOA) state plans for public comment, advocates and other stakeholders have an important opportunity to improve them. The Center for Law and Social Policy (CLASP) is offering a list of questions, which is included in this document, to consider when reviewing state plans. These…

  18. 78 FR 29124 - Draft Environmental Impact Statement (EIS) for the Implementation of Energy, Water, and Solid...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE Department of the Army Draft Environmental Impact Statement (EIS) for the Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort Bliss, Texas and New Mexico AGENCY: Department...

  19. 77 FR 43350 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the San Diego Unified...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Fish and Wildlife Service Draft Environmental Assessment and Proposed Habitat Conservation Plan for the... amended (Act). The application addresses the potential for ``take'' of one federally listed animal, the... program to mitigate the project impacts, as described in the applicant's habitat conservation plan...

  20. 76 FR 22720 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... framework, which includes: A spotted owl habitat suitability model; a spotted owl conservation planning... sent by e-mail to: NSORPComments@fws.gov . FOR FURTHER INFORMATION CONTACT: Brendan White at the above... Register notice (75 FR 56131) announcing the availability of the Draft Revised Recovery Plan for...

  1. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    SciTech Connect

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  2. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for... implementation plan. The implementation plan for the Reservation of the Confederated Tribes of the Coos,...

  3. 76 FR 52966 - Kawailoa Wind Energy Generation Facility, Oahu, HI; Draft Habitat Conservation Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ... Lingle announced in October 2008 a comprehensive alternative energy agreement between the State of Hawaii... energy. The State seeks to move Hawaii toward having 70 percent of its energy use coming from alternative... Fish and Wildlife Service Kawailoa Wind Energy Generation Facility, Oahu, HI; Draft...

  4. 76 FR 55941 - Notice of Availability of the Draft Bakersfield Resource Management Plan and Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... development and other land use authorizations with resource values; and (6) climate change. The Draft RMP... authorizations, livestock grazing, mineral development and recreation. Bitter Creek (6,121 acres): This newly... land use authorizations, mineral development and recreation. Other restrictions include closing...

  5. 77 FR 49824 - Draft Environmental Assessment and Draft Habitat Conservation Plan for TransCanada Keystone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... practicable. Background The Keystone XL Pipeline Project was previously proposed by TransCanada, with a... Permit. The proposed Keystone XL Pipeline Project extended from Canada to the Gulf Coast. A draft environmental impact statement was prepared by the DOS for the Keystone XL Pipeline Project. The...

  6. 77 FR 36573 - DRAFT General Management Plan and Draft Environmental Impact Statement, Fort Matanzas National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... National Monument, Florida AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the... Matanzas National Monument (Monument), Florida. Consistent with NPS laws, regulations, and policies and the purpose of the Monument, the draft EIS/GMP describes the NPS preferred alternative--Alternative...

  7. 77 FR 55222 - Notice of Availability of the Draft Resource Management Plan Amendment and the Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... other public participation activities at least 15 days in advance through public notices, media releases... threatened and endangered plant and animal species. Alternative C also incorporates a managed development.../Draft EIS include air and water quality, biological resources, wild horse and rangeland management,...

  8. The IAU Strategic Plan and its Implementation

    NASA Astrophysics Data System (ADS)

    Miley, George

    2015-03-01

    I shall review the content of the IAU Strategic Plan (SP) to use astronomy as a tool for stimulating development globally during the decade 2010 - 2020. Considerable progress has been made in its implementation since the Plan was ratified at the last General Assembly.

  9. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  10. Waste generator services implementation plan

    SciTech Connect

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  11. A test implementation of the MPI draft message-passing standard

    SciTech Connect

    Gropp, W.; Lusk, E.

    1992-12-01

    Message passing is a common method for programming parallel computers. The lack of a standard has significantly impeded the development of portable software libraries for these machines. Recently, an ad-hoc committee was formed to develop a standard for message-passing software for parallel computers. This group first met in April 1992 at a workshop sponsored in part by the Center for Research on Parallel Computation (CRPC). Four of the attendees at that meeting produced a draft standard, henceforth referred to as the MPI (Message-Passing Interface) draft standard. After review by a larger group, and significant changes in the document, a meeting was held in November to discuss the MPI draft standard. This document is a result of those discussions; it describes a running implementation of in most of the proposed standard,plus additional routines that were suggested by the discussions at the November meeting.

  12. School Improvement Plan Implementation and Instructional Change.

    ERIC Educational Resources Information Center

    Ryan, Susan P.; Flinspach, Susan Leigh

    The Chicago School Reform Act mandated that schools develop and implement their own school improvement plans (SIPs) to meet systemwide goals and expected outcomes. This paper examines the implementation of SIP initiatives in 14 Chicago public schools. Data were derived from interviews with principals and advisory committee chairpersons and from…

  13. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  14. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false How do I make my draft materials separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation...

  15. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How do I make my draft materials separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation...

  16. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How do I make my draft materials separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation...

  17. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How do I make my draft materials separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation...

  18. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... United States Patent and Trademark Office United States Patent and Trademark Office Draft Strategic Plan...) draft strategic plan for fiscal years (FY) 2010-2015 is available for public review and comment. The Government Performance and Results Act of 1993 (GPRA) requires Federal agencies to establish a strategic...

  19. 78 FR 67348 - Invitation for Public Comment on Draft Test Plan for the High Burnup Dry Storage Cask Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... the structures, systems, and components of the dry cask storage systems for high burnup spent nuclear... of dry storage cask systems and experiments would be beneficial. A draft test plan for the High... Invitation for Public Comment on Draft Test Plan for the High Burnup Dry Storage Cask Research...

  20. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... deep draft channel and harbor? 148.215 Section 148.215 Navigation and Navigable Waters COAST GUARD... General § 148.215 What if a port has plans for a deep draft channel and harbor? (a) If a State port will be directly connected by pipeline to a proposed deepwater port, and has existing plans for a...

  1. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... deep draft channel and harbor? 148.215 Section 148.215 Navigation and Navigable Waters COAST GUARD... General § 148.215 What if a port has plans for a deep draft channel and harbor? (a) If a State port will be directly connected by pipeline to a proposed deepwater port, and has existing plans for a...

  2. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... deep draft channel and harbor? 148.215 Section 148.215 Navigation and Navigable Waters COAST GUARD... General § 148.215 What if a port has plans for a deep draft channel and harbor? (a) If a State port will be directly connected by pipeline to a proposed deepwater port, and has existing plans for a...

  3. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... deep draft channel and harbor? 148.215 Section 148.215 Navigation and Navigable Waters COAST GUARD... General § 148.215 What if a port has plans for a deep draft channel and harbor? (a) If a State port will be directly connected by pipeline to a proposed deepwater port, and has existing plans for a...

  4. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists...

  5. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  6. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  7. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  8. Oracle accrual plans from requirements to implementation

    SciTech Connect

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  9. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 6: Controls and guidance

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft Integrated Technology Plan (ITP) on controls and guidance are included. Topics covered include: strategic avionics technology planning and bridging programs; avionics technology plan; vehicle health management; spacecraft guidance research; autonomous rendezvous and docking; autonomous landing; computational control; fiberoptic rotation sensors; precision instrument and telescope pointing; microsensors and microinstruments; micro guidance and control initiative; and earth-orbiting platforms controls-structures interaction.

  10. Defense Special Case Transuranic Waste Implementation Plan

    SciTech Connect

    Pierce, G.D. . Joint Integration Office); Carson, P.H. Corp., Boulder, CO )

    1987-06-01

    The purpose of the Special Case Implementation Plan (SCIP) is to establish a comprehensive plan for the efficient long-term management and disposal of defense special case (SC) transuranic (TRU) waste. To fulfill this purpose, a review of SC waste management strategies (at both the site-specific and TRU program levels), waste characteristics and inventories, processing and transportation options, and disposal requirements was made. This review provides a plan for implementing policy decisions and useful information for making those decisions. The SCIP is intended to provide a baseline plant to which alternate plans can be compared. General potential alternatives are provided for future consideration when data concerning facility availability and costs are better defined. Milestones for the SC Implementation Plan are included which summarize each SC waste site. The cost of implementing the SC program has an upper limit of $89 million for the worst case scenario. The actual cost of implementation could be dramatically lower than the worst case figure. 15 refs., 3 figs., 12 tabs.

  11. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Kalispel Reservation consists of the following...

  12. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Tulalip Reservation consists of the following...

  13. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Makah Indian Reservation consists of the following...

  14. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Muckleshoot Reservation consists of the following...

  15. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the lands in trust that are within the Puyallup...

  16. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Skokomish Reservation consists of the following...

  17. 40 CFR 49.10706 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... of implementation plan. The implementation plan for the Fort Hall Indian Reservation consists of...

  18. 40 CFR 49.10106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Reservation of the Confederated Tribes of the Grand...

  19. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Warm Springs Reservation consists of the following...

  20. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Quinault Reservation consists of the following...

  1. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Nisqually Reservation consists of the following...

  2. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Siletz Reservation consists of the following...

  3. 40 CFR 49.10676 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... Contents of implementation plan. The implementation plan for the Shoalwater Bay Indian Reservation...

  4. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Port Madison Reservation consists of the following...

  5. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Yakama Reservation consists of the following...

  6. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Squaxin Island Reservation consists of the following...

  7. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Hoh Indian Reservation consists of the following...

  8. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... Contents of implementation plan. The implementation plan for the Port Gamble Reservation consists of...

  9. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... Contents of implementation plan. The implementation plan for the Lower Elwha Reservation consists of...

  10. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Swinomish Reservation consists of the following...

  11. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Quileute Reservation consists of the following...

  12. 77 FR 29270 - Approval and Promulgation of Implementation Plans; State of Montana; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... Montana; State Implementation Plan and Regional Haze Federal Implementation Plan'' (77 FR 23988). See... technologies that provide similar control levels at higher cost. See 70 FR 39165 (July 6, 2005). We think it is..., SNCR, and SCR.'' 6. On page 24018, in Table 52, the annual emissions reduction for fuel...

  13. NERSC Strategic Implementation Plan 2002-2006

    SciTech Connect

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  14. 222-S Laboratory maintenance implementation plan

    SciTech Connect

    Heinemann, J.L.

    1997-08-13

    This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance Implementation Plan provides the interface requirements and responsibilities as they apply specifically to 222-S Laboratory. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion section as applied to 222-S Laboratory implementation has been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to keep this document current and in compliance with DOE requirements.

  15. Draft Plan for Development of the Integrated Science Assessment for Nitrogen Oxides - Health Criteria

    EPA Science Inventory

    EPA has announced a draft development plan for the next Integrated Science Assessment (ISA) for the health effects of nitrogen oxides (NOX) which will serve as the scientific basis for review of the primary (health-based) National Ambient Air Quality Standard for nitrogen dioxide...

  16. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  17. 77 FR 51554 - Draft Environmental Impact Statement and Habitat Conservation Plan; Receipt of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... to bats when they are active at low wind speeds by raising turbine cut-in speeds (the wind speed at... bats by fully feathering turbine blades so that they barely move at wind speeds below the cut-in speed... Fish and Wildlife Service Draft Environmental Impact Statement and Habitat Conservation Plan;...

  18. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30...) You must prepare and submit a draft materials separation plan for your municipal waste combustion unit... for separating certain components of municipal solid waste for a given service area prior to...

  19. 77 FR 53908 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... Draft SEIS was published in the Federal Register on June 29, 2012 (77 FR 38824-38825) and the EPA Notice of Availability, which formally opened the comment period, was published on July 6, 2012 (77 FR 40037... 2012 Supplemental Winter Use Plan EIS), and at Yellowstone National Park headquarters, Mammoth...

  20. Response to the Articles on the Draft 2010 National Educational Technology Plan

    ERIC Educational Resources Information Center

    Atkins, Dan; Bennett, John; Brown, John Seely; Dede, Chris; Fishman, Barry; Means, Barbara, Pea, Roy; Thille, Candace; Williams, Brenda

    2011-01-01

    As people who were involved with drafting the 2010 National Educational Technology Plan (NETP), the authors have taken the opportunity to respond to the very interesting perspectives in this special issue. The thoughts here represent only their views and are not an official statement of either the US Department of Education or the NETP Technical…

  1. 76 FR 55923 - Draft Guidance for Industry: Submission of Warning Plans for Cigarettes and Smokeless Tobacco...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Cigarettes and Smokeless Tobacco Products; Availability; Agency Information Collection Activities; Proposed... ``Submission of Warning Plans for Cigarettes and Smokeless Tobacco Products.'' This draft guidance document is... Cigarette Labeling and Advertising Act, as amended by the Family Smoking Prevention and Tobacco Control...

  2. 75 FR 74073 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ..., 2010, we published a Federal Register notice (75 FR 56131) announcing the availability of the Draft... for the Northern Spotted Owl (Strix occidentalis caurina); Reopening of Public Comment Period AGENCY... Revised Recovery Plan for the Northern Spotted Owl (Strix occidentalis caurina) for public review...

  3. 78 FR 47410 - General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... Recreation Area, New Jersey and New York AGENCY: National Park Service, Interior. ACTION: Notice of... Management Plan (GMP), Gateway National Recreation Area (Gateway), New York. The draft describes and analyzes... National Recreation Area, 210 New York Avenue, Staten Island, New York 10305 or telephone at (718)...

  4. Effects of Acid Deposition on Materials. Draft of a Research Plan

    SciTech Connect

    Novakov, T.; Dod, R.L.; Kukacka, L.E.; Lipfert, F.W.

    1985-11-01

    This draft of a Research Plan on the Effects of Acid Deposition on Materials identifies and defines research needs and approaches that should result in a more accurate assessment of materials damage due to various forms of deposition of acidic, acidifying, and other atmospheric species.

  5. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 5: Human Support

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft integrated technology plan (ITP) on human support are included. Topics covered include: human support program; human factors; life support technology; fire safety; medical support technology; advanced refrigeration technology; EVA suit system; advanced PLSS technology; and ARC-EVA systems research program.

  6. 78 FR 78366 - Draft Generic Drug User Fee Act Information Technology Plan; Availability for Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... shortages, drug supply chain, safety, security, and drug innovation. As generic drugs account for more than... approvals, drug supply chain, and other topics related to human pharmaceuticals. The draft GDUFA IT plan... the Division of Dockets Management (HFA-305), Food and Drug Administration, 5630 Fishers Lane,...

  7. 78 FR 42085 - Draft Guidance for Industry on Pediatric Study Plans: Content of and Process for Submitting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ...: Content of and Process for Submitting Initial Pediatric Study Plans and Amended Pediatric Study Plans... Plans: Content of and Process for Submitting Initial Pediatric Study Plans and Amended Pediatric Study... draft guidance for industry entitled ``Pediatric Study Plans: Content of and Process for...

  8. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    SciTech Connect

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  9. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nooksack Indian Tribe of Washington § 49.10466 Contents of implementation plan....

  10. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan....

  11. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan....

  12. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nez Perce Tribe of Idaho § 49.10406 Contents of implementation plan. The...

  13. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Sauk-Suiattle Indian Tribe of Washington § 49.10646 Contents of implementation plan....

  14. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coquille Tribe of Oregon § 49.10016 Contents of implementation plan. The...

  15. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10256 Contents of implementation plan. The...

  16. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Klamath Indian Tribe of Oregon § 49.10226 Contents of implementation plan....

  17. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Stillaguamish Tribe of Washington § 49.10886 Contents of implementation plan....

  18. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Upper Skagit Indian Tribe of Washington § 49.11046 Contents of implementation plan....

  19. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  20. How to Plan and Implement a Workshop.

    ERIC Educational Resources Information Center

    Howell, Jacquie

    These guidelines were developed to assist school administrators who have the responsibility of organizing a one- to three-day professional development program. The first section outlines the tasks involved in planning and implementing a workshop. The remaining sections cover the following: (1) developing and utilizing the workshop theme; (2)…

  1. NASA Education Implementation Plan 2015-2017

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  2. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  3. 78 FR 76852 - Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ...In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the Federal Land Policy and Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM) Las Cruces District Office, Las Cruces, New Mexico, intends to prepare a Supplement to the Tri-County Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this......

  4. 78 FR 67186 - Notice of Availability of the Lewistown Field Office Greater Sage-Grouse Draft Land Use Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... Bureau of Land Management Notice of Availability of the Lewistown Field Office Greater Sage-Grouse Draft Land Use Plan Amendments and Draft Environmental Impact Statement, Montana AGENCY: Bureau of Land... Policy Act of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended,...

  5. 78 FR 68469 - Draft General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ... for future detailed management documents, such as five-year strategic plans and implementation plans.... Subsequently the official responsible for implementing the approved GMP and for monitoring results is...

  6. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  7. 76 FR 3209 - West Los Angeles VA Medical Center Veterans Programs Enhancement Act of 1998; Draft Master Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... as the ``Draft Master Plan.'' The purpose of this plan is to satisfy the legislative mandate of the... Master Plan is to satisfy the legislative mandate of the Veterans Programs Enhancement Act of 1998... legislative mandate. The VPEA Master Plan considers on-campus services that may evolve in the future with...

  8. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  9. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Contents of implementation plan. 49.10406 Section 49.10406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X Implementation Plan for the Nez Perce...

  10. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Contents of implementation plan. 49.10406 Section 49.10406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X Implementation Plan for the Nez Perce...

  11. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  12. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  13. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  14. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  15. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  16. 76 FR 31973 - Draft WaterSMART Strategic Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... available science to understand the impacts of climate change on water supplies; and provide Federal... and time. It is increasingly recognized that water is the primary means through which climate change... environment, and will identify adaptive measures needed to address climate change and future demands....

  17. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... Implementation Sequencing Plan that includes the sequencing and scheduling for implementation of all of...

  18. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... Implementation Sequencing Plan that includes the sequencing and scheduling for implementation of all of...

  19. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  20. 76 FR 44039 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... Development--The planning amendment addresses energy resource decision (i.e., oil and gas, coal, solar, wind... Wind Farm Project; Wyoming AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Availability... the Proposed Chokecherry and Sierra Madre (CCSM) Wind Farm Project and by this notice is (1)...

  1. Gen IV Materials Handbook Implementation Plan

    SciTech Connect

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  2. 78 FR 41947 - Notice of Availability of a Supplement to the Bighorn Basin Draft Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... (73 FR 61900), and the Draft RMP/EIS was released to the public on April 22, 2011. On December 9, 2011, the NOI for the BLM's National Greater Sage-grouse Planning Strategy was published in the Federal Register (76 FR 77008). The planning area for National Greater Sage-grouse Planning Strategy included...

  3. Project implementation plan: ASTD remote deployment

    SciTech Connect

    CRASS, D.W.

    1999-08-18

    This Project Implementation Plan (PIP) shall be the controlling document for the Accelerated Site Technology Deployment (ASTD) supported project to procure and qualify a remote/robotic work platform for large hot cell deactivation in the 324 Building B-Cell. This plan will be integrated into the 324/327 Buildings Stabilization/Deactivation Project, Project Management Plan, (HNF-IP-1289, Rev. 1) and shall comply with the base requirements established in that document. This PIP establishes the baseline and defines the scope, schedule, budget, organizational responsibilities, reporting requirements, deliverables, and end points for the implementation of new technology into B-Cell. This shall include procurement, safety, quality assurance, training, documentation, record management, and facility modifications applicable to this project. Specifically this plan controls and executes the procurement and acceptance, qualification, and turnover of a remote/robotic work platform for 324 Building B-Cell. This includes the development of functional parameters, performance requirements, evaluation criteria, procurement specifications, acceptance and qualification test procedures, training requirements, and turnover responsibilities. The 324/237 Buildings Stabilization/Deactivation Project is currently in its second year of a nine-year project to complete deactivation and closure of the facility for long-term surveillance and maintenance. A major obstacles for the project is the inability to effectively perform deactivation tasks within high radioactively contaminated hot cells. The current strategies utilize inefficient and resource intensive technologies that significantly impact the cost and schedule for stabilization and deactivation. The ASTD Remote Deployment Project shall identify, procure, and turnover, to the B-Cell project, a remote/robot work platform to improve B-Cell cleanup productivity and enhance worker safety and health.

  4. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  5. Food for Thought: Discussion Draft for a Master Plan.

    ERIC Educational Resources Information Center

    Chicago City Coll., IL.

    Articles contributed by the teachers and administrators at Chicago City College are presented in this report. Topics include: Students, Faculty, A View of General Education, Occupational Education, Collective Comprehensiveness, Innovation Plan for Crane Campus, Fiscal Resources, Governance, Administration and Organization, A Note on Community…

  6. 77 FR 30509 - Fiscal Year 2012 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... Commission's Energy Program with an emphasis on alternative and renewable energy projects. Although the 2005... 2005 direction to fund renewable and alternative energy, the FY 2012 Work Plan includes $300,000 toward... Denali Commission has historically received several federal funding sources (identified by the...

  7. 12 CFR 1291.3 - AHP Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false AHP Implementation Plan. 1291.3 Section 1291.3...' AFFORDABLE HOUSING PROGRAM § 1291.3 AHP Implementation Plan. (a) Adoption; no delegation. Each Bank, after consultation with its Advisory Council, shall adopt a written AHP Implementation Plan, and shall not amend...

  8. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan... State implementation plan satisfying the requirements of section 172 of the Act and this subpart to EPA...) The State must submit a plan consistent with the requirements of section 110(a)(2) of the Act...

  9. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Chehalis Reservation, Washington § 49.9896 Contents of...

  10. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Spokane Tribe of the Spokane Reservation, Washington § 49.10826 Contents of...

  11. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Lummi Tribe of the Lummi Reservation, Washington § 49.10316 Contents of...

  12. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Colville Reservation, Washington § 49.9956 Contents of...

  13. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents of...

  14. 49 CFR 37.143 - Paratransit plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Paratransit plan implementation. 37.143 Section 37... WITH DISABILITIES (ADA) Paratransit as a Complement to Fixed Route Service § 37.143 Paratransit plan implementation. (a) Each entity shall begin implementation of its complementary paratransit plan, pending...

  15. 40 CFR 209.10 - Approval of plan, implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Approval of plan, implementation. 209... Approval of plan, implementation. (a) If the Administrator finds that the remedial plan is designed to... plan is not approved, the Administrator will provide the respondent with written notice of...

  16. WHC natural phenomena hazards mitigation implementation plan

    SciTech Connect

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  17. Science operations planning and implementation for Rosetta

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter

    2002-07-01

    The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.

  18. Site characterization plan overview: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Consultation Draft

    SciTech Connect

    1988-01-01

    The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE`s repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab.

  19. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CFR 49.6) may submit to the Environmental Protection Agency (EPA) a revision to its applicable... applicable implementation plan, consistent with this section and 40 CFR part 93, subpart B. (b) Until EPA... the provisions of 40 CFR part 93, subpart B in addition to any existing applicable State or...

  20. 75 FR 79327 - Finding of Substantial Inadequacy of Implementation Plan; Call for Utah State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... 19, 2010 (75 FR 70888). In the November 19, 2010 document, EPA proposed a finding that the Utah State... AGENCY 40 CFR Part 52 Finding of Substantial Inadequacy of Implementation Plan; Call for Utah State... additional information on submitting comments, see the November 19, 2010 (75 FR 70888) proposed rule....

  1. 75 FR 52470 - Approval and Promulgation of Implementation Plans Georgia: State Implementation Plan Revision...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ...On February 9, 2010, EPA published a direct final rule approving revisions to the Georgia State Implementation Plan submitted by the Georgia Environmental Protection Division on September 26, 2006, with a clarifying revision submitted on November 6, 2006. This action corrects a typographical error in the regulatory text in Table (c) of the aforementioned Federal Register...

  2. Administrator's Guide to Technology: Planning, Funding & Implementation.

    ERIC Educational Resources Information Center

    Aspen Education Development Group, Gaithersburg, MD.

    This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…

  3. Site characterization plan overview: reference repository location, Hanford Site, Washington: Consultation draft:

    SciTech Connect

    Not Available

    1988-01-01

    As part of the process for siting the nation's first geologic repository for radioactive waste, the Department of Energy (DOE) is preparing a site characterization plan for the Hanford site in Benton County, Washington. As a step in the preparation of that plan, the DOE has provided, for information and review, a consultation draft of the plan to the State of Washington, the affected Indian Tribes - the Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Indian Tribe, and the Yakima Indian Nation - and the US Nuclear Regulatory Commission. The Hanford site is one of three sites that the DOE currently plans to characterize;the other sites are the Deaf Smith County site in Texas and the Yucca Mountain site in Nevada. After site characterization has been completed and its results evaluated, the DOE will identify from among the three characterized sites the site that is preferred for the repository. The overview presented here consists of brief summaries of important topics covered in the consulation draft of the site characterization plan;it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with breif descriptions of the dispoal system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Hanford site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization.

  4. Selection and implementation of a computer aided design and drafting (CAD/D) system

    SciTech Connect

    Davis, J.P.

    1981-01-01

    Faced with very heavy workloads and limited engineering and graphics personnel, Transco opted for a computer-aided design and drafting system that can produce intelligent drawings, which have associated data bases that can be integrated with other graphical and nongraphical data bases to form comprehensive sets of data for construction projects. Because so much time was being spent in all phases of materials and inventory control, Transco decided to integrate materials-management capabilities into the CAD/D system. When a specific item of material is requested on the graphics equipment, the request triggers production of both the drawing and a materials list. Transco plans to extend its computer applications into mapping tasks as well.

  5. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... available to the public? (a) Distribute your draft materials separation plan to the main public libraries in... location of the public libraries where the public can find your materials separation plan. Include the normal business hours of each library. (5) An agenda of the topics that will be discussed at the...

  6. 76 FR 35009 - Draft Oil and Gas Management Plan/Environmental Impact Statement for Big South Fork National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... and gas management plan for BISO and OBRI was published in the Federal Register on May 31, 2006 (71 FR... National Park Service Draft Oil and Gas Management Plan/Environmental Impact Statement for Big South Fork... Big South Fork National River and Recreation Area and Obed Wild and Scenic River. SUMMARY: Pursuant...

  7. 76 FR 38203 - Endangered and Threatened Wildlife and Plants; Amendment to the Draft Recovery Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... 6, 2007 (72 FR 51461). The recovery plan has not yet been finalized; because new scientific... November 30, 2001 (66 FR 59734), and fully listed it as endangered on March 5, 2003 (68 FR 10388). The last... developed in the 2007 Draft Recovery Plan, based on new information about genetics, disease risk,...

  8. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Where and when must I hold a public meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting...

  9. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Where and when must I hold a public meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting...

  10. General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft

    NASA Technical Reports Server (NTRS)

    Dove, Edwin; Hughes, Steve

    2007-01-01

    The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

  11. Draft Plan for Characterizing Commercial Data Products in Support of Earth Science Research

    NASA Technical Reports Server (NTRS)

    Ryan, Robert E.; Terrie, Greg; Berglund, Judith

    2006-01-01

    This presentation introduces a draft plan for characterizing commercial data products for Earth science research. The general approach to the commercial product verification and validation includes focused selection of a readily available commercial remote sensing products that support Earth science research. Ongoing product verification and characterization will question whether the product meets specifications and will examine its fundamental properties, potential and limitations. Validation will encourage product evaluation for specific science research and applications. Specific commercial products included in the characterization plan include high-spatial-resolution multispectral (HSMS) imagery and LIDAR data products. Future efforts in this process will include briefing NASA headquarters and modifying plans based on feedback, increased engagement with the science community and refinement of details, coordination with commercial vendors and The Joint Agency Commercial Imagery Evaluation (JACIE) for HSMS satellite acquisitions, acquiring waveform LIDAR data and performing verification and validation.

  12. 77 FR 24160 - Revisions to the Hawaii State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... AGENCY 40 CFR Part 52 Revisions to the Hawaii State Implementation Plan AGENCY: Environmental Protection... Implementation Plan (SIP). These revisions would update and replace the minor new source review rules that EPA... not plan to open a second comment period, so anyone interested in commenting should do so at this...

  13. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  14. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  15. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  16. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  17. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  18. Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.

    ERIC Educational Resources Information Center

    Proctor, Enola K.; And Others

    1996-01-01

    Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)

  19. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Submittal of State implementation plan. 51.1002 Section 51.1002 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Provisions for Implementation of PM2.5 National Ambient...

  20. Preclosure performance assessment review of the draft site characterization plan conceptual design report: Technical report

    SciTech Connect

    Waite, D.A.; Gupta, R.; Ludwig, S.B.; Maheras, S.J.; Mayberry, J.J.; Plummer, A.M.; Tarapore, P.S.

    1987-12-01

    This report presents the preclosure performance assessment review (PAR) of the Site Characterization Plan Conceptual Design Report (SCP-CDR). The PAR was performed on the design presented in the SCP-CDR working draft, Revision 1, released in October 1986. After review this working draft became the ''Site Characterization Plan Conceptual Design Report'', Revision 1. There are two distinct objectives of the PAR: (1) to analyze the design presented in the SCP-CDR in terms of offsite and occupational radiological safety, and (2) to test safety assessment methods and tools. This report addresses only the first of the PAR objectives. The PAR analysis consists of assessments of offsite and occupational doses resulting from routine and abnormal repository events. The scope of the analysis is restricted to preclosure operations at the repository. This report addresses (1) the description of repository facilities and operations, (2) the development of radioactive material inventories and radiation dose rates, (3) the development of radioactive material release scenarios and source terms, and (4) the assessment of offsite and occupational radiation dose equivalents. This report contains a summary of the analyses in the above four areas, and analysis details are documented. The results of the assessments are compared with regulatory requirements to determine how the repository performs relative to the requirements. The analyses indicate that the offsite and occupational impacts comply with regulatory requirements. However, based on this preliminary analysis of the draft design document, the occupational impacts exceed the SCP-CDR design objective of 1 rem/year in some areas. 59 refs., 12 figs., 127 tabs.

  1. Easing the Transition: How to Implement an Automated Succession Plan.

    ERIC Educational Resources Information Center

    Andrews, Jean P.

    1989-01-01

    An automated succession plan can create smooth transitions when employees transfer or leave the company. It can also boost productivity and employee morale. (Includes a basic nine-step implementation plan that makes the process easy and relatively painless.) (JOW)

  2. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  3. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  4. Puget Sound Area Electric Reliability Plan. Appendix B : Local Generation Evaluation : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The information and data contained in this Appendix was extracted from numerous sources. The principle sources used for technical data were Bonneville Power Administration's 1990 Resource Program along with its technical appendix, and Chapter 8 of the Draft 1991 Northwest Conservation and Electric Power Plan. All cost data is reported 1988 dollars unless otherwise noted. This information was supplemented by other data developed by Puget Sound utilities who participated on the Local Generation Team. Identifying generating resources available to the Puget Sound area involved a five step process: (1) listing all possible resources that might contribute power to the Puget Sound area, (2) characterizing the technology/resource status, cost and operating characteristics of these resources, (3) identifying exclusion criteria based on the needs of the overall Puget Sound Electric Reliability Plan study, (4) applying these criteria to the list of resources, and (5) summarizing of the costs and characteristics of the final list of resources. 15 refs., 20 tabs.

  5. 75 FR 69373 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... AGENCY 40 CFR Part 49 Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power Plant: Navajo Nation AGENCY: Environmental Protection Agency...) ] signed a proposal to promulgate a source specific Federal Implementation Plan (FIP) requiring the...

  6. Implementation Plan for 1998-1999. Dalton State College Strategic Plan, 1997-2000.

    ERIC Educational Resources Information Center

    Dalton College, GA. Office of Institutional Research and Planning.

    This document presents the second-year implementation plans for 1998-1999 of Dalton State College's Strategic Plan for 1997-2000. It contains the following planning priorities and action plans for the roles of the: President; Office of Institutional Research and Planning; Office of Public Relations; Dean of Academic Affairs; Division of Business…

  7. 76 FR 7116 - Approval and Promulgation of Implementation Plans; Alaska: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ... Plans; Alaska: Prevention of Significant Deterioration; Greenhouse Gas Permitting Authority and... PSD program relating to the permitting of greenhouse gas (GHG) emissions. DATES: This action is... consistent with the draft SIP revision. See 75 FR 75658. The draft SIP revision reflected changes to...

  8. 75 FR 17951 - Notice Re-opening the Comment Period for the Draft Resource Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Draft Environmental Impact Statement for the Clear Creek Management Area, California AGENCY: Bureau of... Statement (EIS) for the Clear Creek Management Area (CCMA). The original notice was published in the Federal...-opening the comment period to end April 19, 2010. FOR FURTHER INFORMATION CONTACT: Sky Murphy,...

  9. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SIP revision allowed under 40 CFR 51.851. When EPA approves a State's or Tribe's conformity provisions... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The Federal conformity rules under this subpart, in addition to any...

  10. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 CFR 51.851. When EPA approves a State's or Tribe's conformity provisions (or a portion thereof) in... 40 Protection of Environment 20 2011-07-01 2011-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate...

  11. 40 CFR 51.390 - Implementation plan revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... U.S.C. or the Federal Transit Laws § 51.390 Implementation plan revision. (a) Purpose and... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Implementation plan revision. 51.390 Section 51.390 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  12. Planning, Developing and Implementing Title III, ESEA Projects.

    ERIC Educational Resources Information Center

    Miller, Donald R.

    This document analyzes the planning, developing, and implementing of fundable Title III, ESEA projects, by integrating the following five strategies: (1) A planning development and implementation strategy, (2) a risk-gain motivation strategy, (3) a problem-solving strategy, (4) a quality assurance and evaluation strategy, and (5) a management…

  13. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  14. 76 FR 65735 - Draft Guidance for Industry: Implementation of Acceptable Abbreviated Donor History Questionnaire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... The draft guidance refers to previously approved collections of information found in FDA regulations.... SUMMARY: The Food and Drug Administration (FDA) is announcing the availability of a draft document... donor history information from frequent donors of blood and blood components that is consistent with...

  15. 78 FR 2425 - Notice of Availability of a Supplement to the Eastern Interior Draft Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... on February 24, 2012 (77 FR 11154). The Environmental Protection Agency (EPA) published its Notice of Availability of the Draft RMP/EIS in the Federal Register on March 2, 2012 (77 FR 12835), beginning a 150-day... Management Plan/Environmental Impact Statement for Leasing of Hardrock Minerals in the White...

  16. 78 FR 26026 - Draft Plan for Development of the Integrated Science Assessment for Nitrogen Oxides-Health Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... quality criteria. On February 10, 2012 (77 FR 7149), EPA formally initiated its current review of the air... of the health effects of NO X (77 FR 7149). NCEA has prepared a draft plan for development of the ISA... comprehensive assessment of the current scientific literature pertaining to known and anticipated effects...

  17. 78 FR 54469 - Solicitation of Written Comments on Draft National Action Plan for Adverse Drug Event Prevention

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... HUMAN SERVICES Solicitation of Written Comments on Draft National Action Plan for Adverse Drug Event... sending comments electronically. Written responses should be addressed to the Department of Health and... submissions will not be considered. Written materials submitted for consideration should not exceed 10...

  18. 76 FR 22684 - Draft Environmental Impact Statement (DEIS) for the Real Property Master Plan at the Presidio of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Department of the Army Draft Environmental Impact Statement (DEIS) for the Real Property Master Plan at the Presidio of Monterey (POM), California AGENCY: Department of the Army, DoD. ACTION: Notice of Availability (NOA). SUMMARY: The Department of the Army announces the availability of the DEIS for the Real...

  19. 78 FR 46598 - Notice of Availability of the Draft Rob Jaggers Camping Area Business Plan and Expanded Amenity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... Bureau of Land Management Notice of Availability of the Draft Rob Jaggers Camping Area Business Plan and Expanded Amenity Fee Schedule for the Fort Stanton/ Snowy River National Conservation Area, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: In accordance with the...

  20. 75 FR 62562 - Endangered and Threatened Wildlife and Plants; Notice of Availability of Draft Recovery Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... northern sea otter as threatened on August 9, 2005 (70 FR 46366). For description, taxonomy, distribution... February 11, 2004, Proposed Listing Rule; 69 FR 6605). Within this range, sea otters generally occur in... Draft Recovery Plan for the Southwest Alaska Distinct Population Segment of the Northern Sea...

  1. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... COMMISSION Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision 0... applications, and to facilitate activities associated with review of applications for design certification and combined license by the Office of New Reactors. The NRC staff intends to incorporate the final...

  2. 76 FR 62832 - Draft Environmental Impact Statement for General Management Plan, Blue Ridge Parkway, VA and NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... availability of a Draft Environmental Impact Statement (DEIS) for the General Management Plan (GMP) for Blue... parkway, the DEIS/GMP describes the NPS preferred alternative-- Alternative B--to guide the management of... alternative. DATES: The NPS will accept comments from the public on the DEIS/GMP for at least 60...

  3. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  4. Implementing successful strategic plans: a simple formula.

    PubMed

    Blondeau, Whitney; Blondeau, Benoit

    2015-01-01

    Strategic planning is a process. One way to think of strategic planning is to envision its development and design as a framework that will help your hospital navigate through internal and external changing environments over time. Although the process of strategic planning can feel daunting, following a simple formula involving five steps using the mnemonic B.E.G.I.N. (Begin, Evaluate, Goals & Objectives, Integration, and Next steps) will help the planning process feel more manageable, and lead you to greater success. PMID:26058285

  5. Surface-based test plan, Deaf Smith County, Texas Site: Draft

    SciTech Connect

    Not Available

    1985-05-08

    The Surface-Based Test Plan (SBTP) is the plan which accounts for all surface-based site field work to be conducted at the Permian salt site selected for characterization. The SBTP relates data needs from program requirement documents and presents plans to satisfy the data needs. The SBTP excludes plans for construction of the Exploratory Shaft Facility (ESF) and plans for the in situ testing. The SBTP is a hierarchical plan stemming from the Technical Program Plan. The SBTP describes in detail the process by which surface-based study plans are defined, developed, and controlled. The plans hierarchy extends downward thru subordinate Site Study Plans (SSPs), which describe in detail elements of field work to be done, to detailed Procedures which document the exact methodologies to be employed in the conduct of field work. The plan is a QA level S document, although some of its elements are at lower QA levels. The plan is a controlled document, and any proposed amendments to the plan or subordinate documents can only be implemented through the specified change control procedure.

  6. Offpost operable unit remedial investigation/endangerment assessment/feasibility study, draft final work plan

    SciTech Connect

    1989-12-01

    This document presents the scope of work for additional data collection activities and interpretive reports to be performed in the off-post operable unit (OU) for preparation of: (1) Addendum to the final remedial investigation report; (2)` Revision of the draft final endangerment assessment/feasibility study. The plan is divided into the following sections: (1) Requirements for the RI addendum - technical approach and data collection program for the RI addendum - technical approach and data collection program for ground water, soil, sediment, biota, air; (2) Revision of the endagerment assessment - items that need to be reevaluated; (3) Revision of the feasibility study - evaluation of different media and ARAR`s development of remedial alternatives; (4) Schedule and description of deliverables. Appendix a contains a detailed approach for the 96th avenue risk assessment.

  7. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  8. Implementing change in the facilities planning process

    SciTech Connect

    Williams, J.L.

    1995-08-01

    In the post-Cold War climate of reduced budgets at the national laboratories, the Sites Planning Department at Sandia National Laboratories was faced with the problem of securing funding for capital construction projects in a very competitive environment. The Department of Energy (DOE), felt that requests for new facilities were not always well coordinated with its mission needs. The Sites Planning Department needed to revolutionize the way they were doing business. To be successful in obtaining approval and funding for future facilities, they recognized the need to concentrate their efforts on project proposals that tap strategic programs at DOE. The authors developed a series of new processes to identify, evaluate, prioritize, and develop line item project proposals to request approval and obtain funding. A matrixed group of sites and facilities directors was formed to establish criteria and make preliminary recommendations to upper management. Matrixed working groups were also established at the staff level to develop and prepare projects for the prioritization process. Ultimately, similar processes will be applied to all project types, and a prioritized plan generated for each. These plans will become the blueprint for an overarching strategic site plan. What started as a means of increasing success in obtaining approval and funding of capital projects has launched a whole new approach to project development that permits incorporation of facilities planning into overall corporate strategic planning.

  9. Management implementation plan for a safety analysis and review system

    SciTech Connect

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply.

  10. Knowledge co-production and boundary work to promote implementation of conservation plans.

    PubMed

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  11. Knowledge co-production and boundary work to promote implementation of conservation plans.

    PubMed

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  12. Orbiting deep space relay station. Volume 3: Implementation plan

    NASA Technical Reports Server (NTRS)

    Hunter, J. A.

    1979-01-01

    An implementation plan for the Orbiting Deep Space Relay Station (ODSRS) is described. A comparison of ODSRS life cycle costs to other configuration options meeting future communication requirements is presented.

  13. AQUATIC STRESSORS: FRAMEWORK AND IMPLEMENTATION PLAN FOR EFFECTS RESEARCH

    EPA Science Inventory

    This document describes the framework and research implementation plans for ecological effects research on aquatic stressors within the National Health and Environmental Effects Laboratory. The context for the research identified within the framework is the common management goal...

  14. 76 FR 33651 - Approval and Promulgation of Implementation Plans; ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; ID AGENCY: Environmental... includes new and revised rules which provide the Idaho Department of Environmental Quality (IDEQ)...

  15. Draft At-Depth Study Plan for an exploratory shaft facility in salt: Revision 1

    SciTech Connect

    Not Available

    1988-03-01

    This draft At-Depth Study Plan describes a program of at-depth monitoring and testing in the bedded salt deposits of a candidate high-level nuclear waste repository site in Deaf Smith County, Texas. The test program will be undertaken within an At-Depth Facility (ADF) constructed at the candidate repository horizon. The purpose of the program is to assist with site characterization in support of determination of site suitability for development as a repository and for preparation of licensing documentation, and to provide information in support of repository design and performance assessment evaluation. The program includes a variety of geological, geophysical, geomechanical, thermochemical, and geohydrological monitoring and testing. The program is presented as a series of separate studies concerned with geological, geomechanical, and geohydrological site characterization, and with evaluating the mechanical and hydrological response of the site to construction of the ADF. The various studies, and associated test or monitoring methods, are included. Specific large-scale tests concerned with evaluating the performance of engineered components of the repository system (i.e., rooms, waste package, bulkhead and backfill seals) will be performed in the ADF but are described separately in individual Study Plan. 53 refs., 54 figs., 24 tabs.

  16. Handbook for Decentralized Education Planning. Implementing National EFA Plans

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    The Dakar 2000 goal of Education For All (EFA) is at the center of UNESCO's education activities worldwide. The wide-ranging efforts to achieve EFA in many countries involve education reform, development strategies and plans. Decentralization, a major component in modernizing the public sector, is also applicable to the education sector. The…

  17. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 51.1002 Section 51.1002 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan. (a) For any area designated by EPA as nonattainment for the PM2.5 NAAQS, the State must submit...

  18. 76 FR 51264 - Approval and Promulgation of Implementation Plans; New York Reasonable Further Progress Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... 31, 2011 (76 FR 17801), EPA proposed approval of the New York State Implementation Plan (SIP.... Conclusion EPA has evaluated New York's submittal for consistency with the Clean Air Act and Agency... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New York Reasonable...

  19. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 3: Space power and thermal management

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the SSTAC/ARTS review of the draft integrated technology plan on thermal power and thermal management are presented. Topics covered include: space energy conversion research and technology; space photovoltaic energy conversion; chemical energy conversion and storage; thermal energy conversion; power management; thermal management; space nuclear power; high capacity power; surface power and thermal management; space platforms power and thermal management; and project SELENE.

  20. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  1. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  2. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  3. Perioperative Research Fellowship: Planning, Implementation, Experience

    PubMed Central

    Memtsoudis, Stavros G; Mazumdar, Madhu; Stundner, Ottokar; Hargett, Mary J.

    2014-01-01

    Perioperative outcomes research has gained widespread interest and is viewed as increasingly important among different specialties, including anesthesiology. Outcome research studies serve to help in the adjustment of risk, allocation of resources, and formulation of hypotheses to guide future research. Pursuing high quality research projects requires familiarity with a wide range of research methodologies, and concepts are ideally learned in a dedicated setting. Skills associated with the use of these methodologies as well as with scientific publishing in general, however, are increasingly challenging to acquire. This article is intended to describe the curriculum and implementation of the Perioperative Medicine and Regional Anesthesia Research Fellowship at the Hospital for Special Surgery. We also propose a methodology to evaluate the success of a research fellowship curriculum. PMID:24942850

  4. Achieving succession planning and implementation: one healthcare network's story.

    PubMed

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks.

  5. Achieving succession planning and implementation: one healthcare network's story.

    PubMed

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks. PMID:24409581

  6. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application... Tribe/Consortium in drafting its planning grant application? 1000.68 Section 1000.68 Indians OFFICE OF... planning grant application? Yes, upon request from the Tribe/Consortium, a non-BIA bureau may...

  7. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of

  8. Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

    SciTech Connect

    Not Available

    1988-01-01

    The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab.

  9. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  10. Implementation plan for Bolivian Mineral Exploration Fund

    USGS Publications Warehouse

    Kirkemo, Harold

    1978-01-01

    Bolivia ranks second among world producers of tin and antimony, and first in bismuth production. Mineral exports in 1975 were valued at $314.2 million, nearly 60 percent of the value of all exports, and petroleum product exports totalled nearly $157 million, or 30 percent of the total. Tin accounted for 58 percent of the total value of metallic mineral exports. The central government derived about 19 percent of its total tax revenues in 1975 from the mining sector. The mining sector consists of the large, medium, and small mining subsectors, a classification established by the government. Individual operations are referred to as large, medium, or small depending upon the subsector into which they are classified. All large mining enterprises are owned and operated by a government corporation, COMIBOL; the medium and small operations are privately owned. COMIBOL's exports in 1975 were valued at $171.8 million or 70 percent of the total mineral exports; the medium mines accounted for $55.5 million or 23 percent, and the small mines for $17.5 million or 7 percent of the total. The combination of high operating costs, low productivity, inadequate ore reserves, and insufficient risk capital for exploration and development has led to the realization that there is an urgent need to improve the situation for mining in Bolivia. Proposals are being studied to revise the tax code, a program is underway to evaluate selected mineral deposits for possible exploration and development, and programs are under consideration to encourage minerals exploration. A minerals exploration plan is proposed which would offer technical and financial aid to various segments in the minerals field. A program, estimated to cost between $2 million and $2.5 million annually, and to be operated by a new agency in the Ministry of Mining and Metallurgy, is outlined.

  11. 40 CFR 93.124 - Using the motor vehicle emissions budget in the applicable implementation plan (or implementation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DETERMINING... Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title...

  12. 40 CFR 93.124 - Using the motor vehicle emissions budget in the applicable implementation plan (or implementation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DETERMINING... Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title...

  13. Update of the used fuel disposition Campaign Implementation Plan

    SciTech Connect

    Birkholzer, Jens; MacKinnon, Robert; McMahon, Kevin; Saltzstein, Sylvia; Sorenson, Ken; Swift, Peter

    2014-09-01

    This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  14. Tank waste remediation system configuration management implementation plan

    SciTech Connect

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  15. High performance computing and communications: FY 1996 implementation plan

    SciTech Connect

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  16. Implementation plan for engineering research, development and demonstration

    SciTech Connect

    Not Available

    1994-10-01

    This document contains information on the planned implementation of the EMF RAPID Program`s engineering activities. It describes the approach and specific projects required to achieve the goals laid out in the EMF Engineering Research component of the Research Agenda and Communication Plan. In addition to efforts funded by the RAPID Program, ongoing quality assurance and dosimetry research currently funded by the DOE EMF Biological Mechanisms Research Program are considered essential to achieving the goals of the RAPID Program.

  17. RCRA implementation plan (RIP): Fiscal years 1996--1997

    SciTech Connect

    1995-05-01

    The report defines the national policy and strategic goals and priority activities for the RCRA solid and hazardous waste program. Includes both changes and clarifications to the fiscal year 1994 RCRA implementation plan and the fiscal year 1995 addendum. It provides additional guidance in waste minimization, corrective action, state grants, beginning of the year plans, Indian programs, environmental justice, information management, state authorization, permitting/closure, and subtitle D activities.

  18. A process for implementation of the strategic plan: from strategic planning toward strategic management.

    PubMed

    Chenoy, N C; Morrison, M J; Carlow, D R

    1991-01-01

    Although the principles and process for developing a strategic plan are well established, little information exists on how organizations can implement these plans. The authors developed a framework and methodology for The Ontario Cancer Institute/Princess Margaret Hospital that connects the implementation of the strategic plan with resource allocation and the budget; thus, the budget is a quantified expression of the strategic plan. To accomplish this, a specific cycle of events leading to the development of a corporate calendar was undertaken, which results in the establishment of the annual budget.

  19. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  20. Collaborative multi-stakeholder approach to drafting flood risk management plans in Wallonia, Belgium

    NASA Astrophysics Data System (ADS)

    Maroy, Edith; Javaux, Mathieu; Vandermosten, Pierre; Englebert, Benjamin

    2015-04-01

    The Flood Directive 2007/60/CE establishes a common framework within the European Union for assessing and reducing risks posed by floods on human health, the environment, economic activity and cultural heritage. For that purpose, Member States had to establish flood areas and flood risk maps, and subsequently, flood risk management plans (due December 2015). According to the Directive, special attention is to be paid to international coordination for transboundary water courses, integrated management approaches at the catchment scale, cost-effectiveness of measures and public involvement. Management measures must focus on reducing the probability of flooding and the potential consequences of flooding. They must cover prevention, protection and preparedness and must take into account relevant aspects, such as water management, soil management, spatial planning, land use and nature conservation. Floods in Wallonia mostly originate from overflowing of both little sloped rivers and highly reactive rivers but also, from concentrated runoff in the intensely cultivated and erosion-prone region north of the Sambre-Meuse axis. Consequently, walloon flood area maps not only show flood areas based on hydraulic modelling and observations but also runoff concentration axis in agricultural areas. Now released to the public, this information can be used to assess the risk of damage for land planning and erosion control strategies. Incidentally, some 166 km2 were mapped as flood hazard area with a return period of 25 years, 28.8 of which are urbanized or destined to urbanisation and counting of number of approximatively 39.000 people living in those areas. Flood area and flood risk maps should be the starting point of elaborating flood risk management plans. In order to involve the diversity of water managers and stakeholders in the drafting of a management plan for hydrographic districts in Wallonia, responsible authorities decided to mandate scientists and engineers to organize

  1. Development and implementation of an interdisciplinary plan of care.

    PubMed

    Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff

    2005-01-01

    In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.

  2. 78 FR 39010 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ..., and Kaycee. The revised RMP will replace the 1985 Buffalo RMP as amended. The Draft RMP/EIS includes a..., oil and gas, renewable energy, and uranium), wildlife habitat management including that of the...

  3. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Master Implementation Sequencing Plan. 385.30 Section 385.30 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION...

  4. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  5. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  6. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  7. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... refers to use, pursuant to subpart H of this part, of technology embedded in PTC systems that does not... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. Link to...

  8. Global Education-An Implementation Plan & Resource Guide.

    ERIC Educational Resources Information Center

    Sny, Chris

    This guide contains a rationale, plan, and bibliography for the implementation of a K-12, district wide, global education program. Parts one and two of the guide provide a definition of and rationale for global education. Global education is defined as the lifelong growth in understanding, through study and participation, of the world community…

  9. Implementation plan for HANDI 2000 TWRS master equipment list

    SciTech Connect

    BENNION, S.I.

    1999-03-25

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  10. Current Strategic Business Plan for the Implementation of Digital Systems.

    ERIC Educational Resources Information Center

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  11. 2016-2020 Strategic Plan and Implementing Framework

    SciTech Connect

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  12. Implementing the Plan. Competency Based Teaching Materials in Horticulture.

    ERIC Educational Resources Information Center

    Legacy, Jim; And Others

    This competency-based curriculum unit on implementing the landscape plan is one of five developed for classroom use in teaching the landscape/nursery area of horticulture. The seven sections are each divided into teaching content (in a question-and-answer format) and student skills that outline steps and factors for consideration. Topics covered…

  13. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  14. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  15. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  16. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  17. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  18. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  19. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  20. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  1. Guide of Ideas for Planning and Implementing Intergenerational Projects

    ERIC Educational Resources Information Center

    Pinto, Teresa Almeida; Marreel, Iris; Hatton-Yeo, Alan

    2009-01-01

    "Guide of Ideas for Planning and Implementing Intergenerational Projects," is for all professionals that are or wish to be enrolled in the development of intergenerational activities. This "Guide" is the main product of the Project MATES--Mainstreaming Intergenerational Solidarity, co-financed by the Lifelong Learning Programme from the…

  2. 30 CFR 46.4 - Training plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Training plan implementation. 46.4 Section 46.4 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND, GRAVEL, SURFACE...

  3. 30 CFR 46.4 - Training plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Training plan implementation. 46.4 Section 46.4 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND, GRAVEL, SURFACE...

  4. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents....

  5. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents....

  6. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  7. TTIP: Texas Teacher Internship Program: 1995 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    In 1989 the Texas Alliance for Science, Technology and Mathematics Education began placing teachers of all levels at industry sites as part of its Texas Teacher Internship Program. In 1995, 15 teachers interned at 11 sites. Each teacher was required to develop a curriculum implementation plan which was to illustrate how they would translate the…

  8. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  9. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  10. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  11. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  12. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  13. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  14. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  15. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  16. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  17. The Common Core: Are State Implementation Plans Enough?

    ERIC Educational Resources Information Center

    Best, Jane; Cohen, Courtney

    2013-01-01

    This policy brief outlines the Common Core implementation plans for 15 states, including the professional development and resources/tools--such as instructional materials, toolkits, frameworks, crosswalks, and curriculum guides--that each state is providing. The authors suggest that supplemental resources like McREL's Common Core…

  18. Issues in Planning and Implementing National Literacy Programmes.

    ERIC Educational Resources Information Center

    Carron, G., Ed.; Bordia, A., Ed.

    The following papers were produced by participants and resource persons on specific issues of planning, management and implementation of literacy and post-literacy strategies: "People's Participation and Mobilization: Characteristics of the Literacy Campaigns in China" (Yanwei); "Strategies for Mobilization and Participation of Volunteers in…

  19. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Contents of implementation plan. 49.11016 Section 49.11016 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... for agriculture burning permits. (j) Section 49.134Rule for forestry and silvicultural burning...

  20. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49.11016 Section 49.11016 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... agriculture burning permits. (j) Section 49.134Rule for forestry and silvicultural burning permits....

  1. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Contents of implementation plan. 49.11016 Section 49.11016 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... for agriculture burning permits. (j) Section 49.134Rule for forestry and silvicultural burning...

  2. 75 FR 45080 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) emissions from boilers, steam... Boilers, Steam Generators 12/17/09 05/17/10 and Process Heaters-- 0.75 to less than 2.0 MMbtu/hr. On June... from boilers, steam generators, process heaters and water heaters with a total rated heat input...

  3. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2010-10-01 2010-10-01 false Aircraft Operator Implementation Plan....

  4. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2014-10-01 2014-10-01 false Aircraft Operator Implementation Plan....

  5. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2012-10-01 2012-10-01 false Aircraft Operator Implementation Plan....

  6. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2011-10-01 2011-10-01 false Aircraft Operator Implementation Plan....

  7. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2013-10-01 2013-10-01 false Aircraft Operator Implementation Plan....

  8. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  9. High performance computing and communications: FY 1995 implementation plan

    SciTech Connect

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  10. Discharge Planning in Acute Care Hospitals in Israel: Services Planned and Levels of Implementation and Adequacy

    ERIC Educational Resources Information Center

    Auslander, Gail K.; Soskolne, Varda; Stanger, Varda; Ben-Shahar, Ilana; Kaplan, Giora

    2008-01-01

    This study aimed to examine the implementation, adequacy, and outcomes of discharge planning. The authors carried out a prospective study of 1,426 adult patients discharged from 11 acute care hospitals in Israel. Social workers provided detailed discharge plans on each patient. Telephone interviews were conducted two weeks post-discharge. Findings…

  11. EG and G Idaho Environmental Protection Implementation Plan (1990)

    SciTech Connect

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  12. FY 95 engineering work plan for the design reconstitution implementation action plan

    SciTech Connect

    Bigbee, J.D.

    1994-11-09

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

  13. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect

    Not Available

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  14. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  15. Planning and implementation of nonformal education projects in rural Thailand

    NASA Astrophysics Data System (ADS)

    Hugkuntod, Ubon; Tips, Walter E. J.

    1987-03-01

    This is a study of the factors that cause success and failure of implementation of rural nonformal education projects. The research indicates that late release of funds, the lack of a consistent plan, the lack of understanding of the roles and duties of staff, and conflicts between staff are the major problems in implementing nonformal education projects. Moreover, the successful achievement of nonformal education projects depends on co-ordination among organizations concerned, in matters of target groups, times of project implementation, and budgets. In addition, implementation should emphasize people's participation in project identification. The following changes are needed for more effective co-ordination: two-way communication in a horizontal line, the development of a workable administrative system and of similar attitudes and perceptions of staff in all organizations. In addition to these factors, staff experience is also important for successful co-ordination.

  16. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-01-01

    deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.

  17. Architectural Drafting, Drafting 2: 9255.04.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course covers the basic fundamentals of architectural drafting and is not intended to delve into the more advanced phases of architecture. The student is presented with standards and procedures, and will become proficient in layout of floor plans, electrical plans, roof construction, foundation plans, typical wall construction, plot plans, and…

  18. 75 FR 21197 - Approval and Promulgation of Implementation Plans; Implementation Plan Revision; State of New Jersey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... (see 74 FR 2945, January 16, 2009), which will result in additional emission reductions of NO X and... any major non-CTG sources. Section IV.G of EPA's Phase 2 implementation rule (70 FR 71612, November 29... analysis and agreed with the State's conclusions. On May 15, 2009 (74 FR 22837) EPA conditionally...

  19. 75 FR 9373 - Approval and Promulgation of Implementation Plans; New York State Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... outdoors, and individuals with a pre-existing respiratory disease, such as asthma. On April 30, 2004 (69 FR... Poughkeepsie nonattainment area is composed of Dutchess, Orange and Putnam counties. On March 25, 2008 (73 FR... implementation rule, published on April 30, 2004 (69 FR 23951) and referred to as the Phase 1 Rule,...

  20. Technical procedures for the implementation of cultural resource site studies, Deaf Smith County, Texas: Preliminary draft

    SciTech Connect

    Not Available

    1987-09-30

    Cultural resources at the Deaf Smith County site will be identified, evaluated and managed through the implementation of studies detailed in the Site Study Plan for Cultural Resources. This technical procedure outlines the conduct of pedestrian survey and the documentation of identified cultural resources. The purpose of the field surveys is to identify and document cultural resources in the areas that will be affected by site characterization activities and to record the environmental setting of identified cultural resources. Three pedestrian surveys will cover 100 percent of the on-site and off-site project areas. Survey 1 will provide coverage of the Repository Surface Facility (RSF) area, which includes the Exploratory Shaft Facility (ESF) and two linear engineering design borehole (EDBH) seismic survey corridors. Survey 2 will provide coverage of a 39 km/sup 2/ (15 mi/sup 2/) area that includes the 23 km/sup 2/ (9 mi/sup 2/) Deaf Smith County site plus a 0.4 to 0.8 kM (1/4 to 1/2 mi) border area but excludes the area covered by Survey 1. Survey 3 will cover offsite geotechnical test areas, such as the locations of playa boreholes, deep playa wells, hydrologic tests, site foundation borings, and their access routes. The purpose of site documentation or recording is to address the project information needs for land use permits and approvals, engineering design support, and cultural resource evaluation for National Register of Historic Places eligibility. Site documentation will consist of gathering sufficient data on identified resources to complete Texas Natural Resource Information System (TNRIS). 7 refs., 3 figs.

  1. Liquid effluent Sampling and Analysis Plan (SAP) implementation summary report

    SciTech Connect

    Lueck, K.J.

    1995-04-26

    This report summarizes liquid effluent analytical data collected during the Sampling and Analysis Plan (SAP) Implementation Program, evaluates whether or not the sampling performed meets the requirements of the individual SAPs, compares the results to the WAC 173-200 Ground Water Quality Standards. Presented in the report are results from liquid effluent samples collected (1992-1994) from 18 of the 22 streams identified in the Consent Order (No. DE 91NM-177) requiring SAPs.

  2. 76 FR 48879 - Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Fish and Wildlife Service Draft Environmental Impact Statement for Alabama Beach Mouse General... endangered Alabama beach mouse (Peromyscus polionotus ammobates) in Baldwin County, Alabama. The GCP analyzes... availability of the proposed GCP and the dEIS. These documents analyze the take of the Alabama beach...

  3. 77 FR 61426 - Rose Atoll National Wildlife Refuge, American Samoa; Draft Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-09

    ... comment. In the Draft CCP/EA, we present two alternatives for managing this refuge for the next 15 years... national wildlife refuge. The purpose for developing a CCP is to provide refuge managers with a 15-year... policies. We will review and update the CCP at least every 15 years in accordance with the...

  4. 76 FR 69758 - Draft Environmental Assessment, Incidental Take Plan, and Application for an Incidental Take...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... expertise among trappers and non-trappers that may provide other minimization and mitigation measures in... inform the decision making process. In the draft EA, we attempted to quantify the incidental take of non-target wildlife (species other than lynx) in traps. We are particularly interested in whether there...

  5. 77 FR 30319 - Draft Environmental Impact Statement for General Management Plan, Fort Pulaski National Monument, GA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... National Monument, GA AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft...) and Wilderness Study for Fort Pulaski National Monument (monument). Consistent with NPS laws, regulations, and policies and the purpose of the monument, the DEIS/GMP/Wilderness Study describes...

  6. 12 CFR 192.500. - What management stock benefit plans may I implement?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may implement a stock option plan (Option Plan), an employee stock ownership plan or other...

  7. Westinghouse Hanford Company quality assurance program and implementation plan

    SciTech Connect

    Moss, S.S., Westinghouse Hanford

    1996-07-01

    This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time

  8. 77 FR 39959 - Draft Guidance To Implement Requirements for the Treatment of Air Quality Monitoring Data...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... information is not publicly available, e.g., CBI or other information whose disclosure is restricted by...: Beth W. Palma, U.S. EPA, Office of Air ] Quality Planning and Standards, Air Quality Policy Division... the following address: Roberto Morales, U.S. EPA, Office of Air Quality Planning and Standards,...

  9. Self-assessment program implementation plan. Revision A

    SciTech Connect

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  10. Guideline adaptation and implementation planning: a prospective observational study

    PubMed Central

    2013-01-01

    Background Adaptation of high-quality practice guidelines for local use has been advanced as an efficient means to improve acceptability and applicability of evidence-informed care. In a pan-Canadian study, we examined how cancer care groups adapted pre-existing guidelines to their unique context and began implementation planning. Methods Using a mixed-methods, case-study design, five cases were purposefully sampled from self-identified groups and followed as they used a structured method and resources for guideline adaptation. Cases received the ADAPTE Collaboration toolkit, facilitation, methodological and logistical support, resources and assistance as required. Documentary and primary data collection methods captured individual case experience, including monthly summaries of meeting and field notes, email/telephone correspondence, and project records. Site visits, process audits, interviews, and a final evaluation forum with all cases contributed to a comprehensive account of participant experience. Results Study cases took 12 to >24 months to complete guideline adaptation. Although participants appreciated the structure, most found the ADAPTE method complex and lacking practical aspects. They needed assistance establishing individual guideline mandate and infrastructure, articulating health questions, executing search strategies, appraising evidence, and achieving consensus. Facilitation was described as a multi-faceted process, a team effort, and an essential ingredient for guideline adaptation. While front-line care providers implicitly identified implementation issues during adaptation, they identified a need to add an explicit implementation planning component. Conclusions Guideline adaptation is a positive initial step toward evidence-informed care, but adaptation (vs. ‘de novo’ development) did not meet expectations for reducing time or resource commitments. Undertaking adaptation is as much about the process (engagement and capacity building) as it

  11. 78 FR 59242 - Approval and Promulgation of Air Quality Implementation Plans; Utah; Maintenance Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Utah; Maintenance...: Degreasing and Solvent Cleaning Operations;'' R307- 340, ``Ozone Nonattainment and Maintenance Areas: Surface... 110 of the Clean Air Act (Act or CAA). DATES: This action is effective on October 28, 2013....

  12. 78 FR 71704 - Request for Comments on Draft SBA Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... plan is available on SBA's Web site at http://www.sba.gov/about-sba/sba_performance/strategic_planning... Strategic Plan is provided for public input as part of the strategic planning process under the Government...://www.sba.gov/about-sba/sba_performance/strategic_planning . Jonathan I. Carver, Associate...

  13. 78 FR 69998 - Approval and Promulgation of Air Quality Implementation Plans; Rescission of Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Federal Implementation Plan; Wyoming; Prevention of Significant Deterioration; Greenhouse Gas Tailoring... of greenhouse gases (GHGs). Specifically, we are approving revisions to Wyoming's Air Quality..., Section 7, Greenhouse Gases. EPA is also rescinding the GHG PSD Federal Implementation Plan (FIP)...

  14. 78 FR 11809 - Approval and Promulgation of Implementation Plans; State of Missouri; Restriction of Emission of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Missouri; Restriction of Emission of Particulate Matter From Industrial Processes AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA proposes to approve the State Implementation Plan...

  15. Implementing OPA 90 preparedness and response strategies planning

    SciTech Connect

    Pond, B.

    1994-08-01

    A slide presentation is given on the National Preparedness Response Exercise Program (PREP). PREP is designed to interpret and provide a consistent approach to the pollution response exercise requirements outlined in various federal regulations implementing the provisions of OPA90. PREP is designed as a voluntary, non-regulatory program, but compliance will fully satisfy all OPA mandated federal requirements for pollution response exercises, as well as the requirements of many coastal states. It is believed that the PREP program will be a critical part in enhancing national preparedness, improving contingency plans, and reinforcing OPA`s process of preparedness.

  16. GEWEX America Prediction Project (GAPP) Science and Implementation Plan

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The purpose of this Science and Implementation Plan is to describe GAPP science objectives and the activities required to meet these objectives, both specifically for the near-term and more generally for the longer-term. The GEWEX Americas Prediction Project (GAPP) is part of the Global Energy and Water Cycle Experiment (GEWEX) initiative that is aimed at observing, understanding and modeling the hydrological cycle and energy fluxes at various time and spatial scales. The mission of GAPP is to demonstrate skill in predicting changes in water resources over intraseasonal-to-interannual time scales, as an integral part of the climate system.

  17. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    NASA Astrophysics Data System (ADS)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  18. Lessons learned from the preclosure performance assessment review of the Fluor Technology, Inc. , draft site characterization plan conceptual design report

    SciTech Connect

    Mayberry, J.J.

    1987-06-09

    This report presents the lessons learned from the preclosure performance assessment review (PAR) of the Draft Site Characterization Plan---Conceptual Design Report (SCP-CDR). The PAR analyzes the operations of the waste handling facilities as presented in the SCP-CDR against appropriate regulatory and design criteria. The PAR applies to the design presented in a working draft released in April, 1986. We will analyze the design presented in the SCP-CDR, the other is to test safety assessment methods and tools. This report addresses only the second of these objectives. The PAR analysis consists of assessments of offsite and occupational doses resulting from routine and accidental events during preclosure operations at the repository. The activities related to the PAR are divided into subject areas. These areas include (1) the description of repository facilities and operations, (2) the development of radioactive material inventories and radiation dose rates, (3) the development of radioactive material-release scenarios and source terms, (4) the assessment of offsite dose equivalents, and (5) the assessment of occupational radiation dose equivalents. This report contains a summary of the analyses in these fives areas and lists those preclosure analyses not performed as part of the PAR. Chapters detail the strengths and weaknesses of each analysis and include recommendations for improving the analyses. 15 refs., 1 fig., 1 tab.

  19. Lawrence Berkeley Laboratory Self-Assessment Program: Implementation Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Lawrence Berkeley Laboratory (LBL) Self-Assessment Program provides a formal process for assuring quality and regulatory compliance in all facets of Laboratory operations. The program, which integrates the ongoing self-assessment activities of the individual Divisions and Offices in a comprehensive, top-to-bottom process, provides assistance to the US Department of Energy (DOE), the University of California, and Laboratory management in their appraisals of Laboratory performance. This document describes the program goals, scope, responsibilities, elements, and implementation schedule. This document is also the implementation plan for the institutional level self-assessment program. Each Division is also required to develop a self-assessment program that contains the elements described in this document.

  20. A strategic approach for Water Safety Plans implementation in Portugal.

    PubMed

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  1. 76 FR 11963 - Updating Cross-References for the Oklahoma State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans'' (SIP Narrowing Rule) (75 FR 82536... Deterioration Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans'' at 75 FR... Deterioration Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans'' to...

  2. 40 CFR 49.9900 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9900 Section 49.9900 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Chehalis Reservation, Washington §...

  3. 40 CFR 49.10530 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10530 Section 49.10530 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Puyallup Tribe of the Puyallup Reservation, Washington §...

  4. 40 CFR 49.10110 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10110 Section 49.10110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Grand Ronde Community of Oregon §...

  5. 40 CFR 49.10830 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10830 Section 49.10830 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Spokane Tribe of the Spokane Reservation, Washington §...

  6. 40 CFR 49.10140 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10140 Section 49.10140 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Hoh Indian Tribe of the Hoh Indian Reservation, Washington §...

  7. 40 CFR 49.10710 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10710 Section 49.10710 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Shoshone-Bannock Tribes of the Fort Hall Indian Reservation of...

  8. 40 CFR 49.9960 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9960 Section 49.9960 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Colville Reservation, Washington §...

  9. 40 CFR 49.9930 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9930 Section 49.9930 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho §...

  10. 40 CFR 49.10320 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10320 Section 49.10320 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Lummi Tribe of the Lummi Reservation, Washington §...

  11. 40 CFR 49.10560 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10560 Section 49.10560 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Quileute Tribe of the Quileute Reservation, Washington §...

  12. 40 CFR 49.10260 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10260 Section 49.10260 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10260 Federally-promulgated...

  13. 40 CFR 49.10960 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10960 Section 49.10960 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Swinomish Indians of the Swinomish Reservation, Washington §...

  14. 40 CFR 49.10770 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10770 Section 49.10770 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Skokomish Indian Tribe of the Skokomish Reservation, Washington §...

  15. 40 CFR 49.10990 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10990 Section 49.10990 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Tulalip Tribes of the Tulalip Reservation, Washington §...

  16. 40 CFR 49.10410 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10410 Section 49.10410 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nez Perce Tribe of Idaho § 49.10410...

  17. 40 CFR 49.10230 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10230 Section 49.10230 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Klamath Indian Tribe of Oregon § 49.10230...

  18. 40 CFR 49.10740 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10740 Section 49.10740 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Siletz Reservation, Oregon §...

  19. 40 CFR 49.10650 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10650 Section 49.10650 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Sauk-Suiattle Indian Tribe of Washington § 49.10650...

  20. 40 CFR 49.11050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.11050 Section 49.11050 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Upper Skagit Indian Tribe of Washington § 49.11050...

  1. 40 CFR 49.10470 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10470 Section 49.10470 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nooksack Indian Tribe of Washington § 49.10470...

  2. 40 CFR 49.10200 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10200 Section 49.10200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Kalispel Indian Community of the Kalispel Reservation,...

  3. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10170 Section 49.10170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10170...

  4. 40 CFR 49.10930 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10930 Section 49.10930 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Suquamish Indian Tribe of the Port Madison Reservation,...

  5. 40 CFR 49.10440 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10440 Section 49.10440 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nisqually Indian Tribe of the Nisqually Reservation, Washington §...

  6. 40 CFR 49.10590 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10590 Section 49.10590 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Quinault Tribe of the Quinault Reservation, Washington §...

  7. 40 CFR 49.10680 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10680 Section 49.10680 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Shoalwater Bay Tribe of the Shoalwater Bay Indian...

  8. 40 CFR 49.10020 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10020 Section 49.10020 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coquille Tribe of Oregon § 49.10020...

  9. 40 CFR 49.10380 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10380 Section 49.10380 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Muckleshoot Indian Tribe of the Muckleshoot Reservation,...

  10. 40 CFR 49.10500 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10500 Section 49.10500 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Port Gamble Indian Community of the Port Gamble...

  11. 40 CFR 49.10860 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10860 Section 49.10860 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Squaxin Island Tribe of the Squaxin Island Reservation,...

  12. 40 CFR 49.11110 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.11110 Section 49.11110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes and Bands of the Yakama Nation, Washington §...

  13. 40 CFR 49.10350 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10350 Section 49.10350 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Makah Indian Tribe of the Makah Indian Reservation, Washington §...

  14. 40 CFR 49.10890 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10890 Section 49.10890 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Stillaguamish Tribe of Washington § 49.10890...

  15. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.11080 Section 49.11080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon §...

  16. 40 CFR 49.9990 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9990 Section 49.9990 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians...

  17. 40 CFR 49.10290 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10290 Section 49.10290 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Lower Elwha Tribal Community of the Lower Elwha...

  18. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10050 Section 49.10050 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10050...

  19. 40 CFR 52.2479 - Contents of the federally approved, State submitted implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., State submitted implementation plan. 52.2479 Section 52.2479 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Washington § 52.2479 Contents of the federally approved, State submitted implementation plan....

  20. 76 FR 40248 - Approval and Promulgation of Implementation Plans; Connecticut, Maine, New Hampshire and Rhode...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... 80,186 (December 31, 2002), as amended by 72 FR 32,526 (June 13, 2007) (``NSR Reform''). In light of... Implementation Plan; Call for Utah State Implementation Plan Revision,'' 74 FR 21,639 (April 18, 2011). \\14\\ EPA... Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule,'' 75 FR 82,536 (Dec....

  1. 76 FR 40258 - Approval and Promulgation of Implementation Plans; State of NE

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Substantial Inadequacy of Implementation Plan; Call for Utah State Implementation Plan Revision,'' 74 FR 21639... Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule,'' 75 FR..., the U.S. House of Representatives, and the Comptroller General of the United States prior...

  2. Radioactive waste isolation in salt: Peer review of the Golder Associates draft test plan for in situ testing in an exploratory shaft in salt

    SciTech Connect

    Hambley, D.F.; Mraz, D.Z.; Unterberter, R.R.; Stormont, J.C.; Neuman, S.P.; Russell, J.E.; Jacoby, C.H.; Hull, A.B.; Brady, B.H.G.; Ditmars, J.D.

    1987-01-01

    This report documents the peer review conducted by Argonne National Laboratory of a document entitled ''Draft Test Plan for In Situ Testing in an Exploratory Shaft in Salt,'' prepared for Battelle Memorial Institute's Office of Nuclear Waste Isolation by Golder Associates, Inc. In general, the peer review panelists found the test plan to be technically sound, although some deficiencies were identified. Recommendations for improving the test plan are presented in this review report. A microfiche copy of the following unpublished report is attached to the inside back cover of this report: ''Draft Test Plan for In Situ Testing in an Exploratory Shaft in Salt,'' prepared by Golder Associates, Inc., for Office of Nuclear Waste Isolation, Battelle Memorial Institute, Columbus, Ohio (March 1985).

  3. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  4. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  5. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  6. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  7. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  8. 75 FR 27838 - Notice of Availability of Draft NUREG-1800, Revision 2; “Standard Review Plan for Review of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... Lessons Learned (GALL) Report'' AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Issuance of draft... ''and draft NUREG-1801, ``Generic Aging Lessons Learned (GALL) Report'' for public comment; and... revised NUREG-1801, ``Generic Aging Lessons Learned (GALL) Report'' for public comment. These...

  9. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  10. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  11. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  12. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  13. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  14. Partnerships for Policy Development: A Case Study From Uganda's Costed Implementation Plan for Family Planning.

    PubMed

    Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta

    2016-06-20

    In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda's CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda's CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda's CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621

  15. Partnerships for Policy Development: A Case Study From Uganda's Costed Implementation Plan for Family Planning.

    PubMed

    Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta

    2016-06-20

    In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda's CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda's CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda's CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution.

  16. 76 FR 4360 - Draft Guidance for Industry: Questions and Answers Regarding Implementation of the Menu Labeling...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Implementation of the Menu Labeling Provisions of Section 4205 of the Patient Protection and Affordable Care Act... Provisions of Section 4205 of the Patient Protection and Affordable Care Act of 2010'' dated August 2010... and comment rulemaking process for the Patient Protection and Affordable Care Act of 2010...

  17. Idaho National Laboratory Site Long-Term Stewardship Implementation Plan

    SciTech Connect

    B. E. Olaveson

    2006-07-27

    The U.S. Department of Energy has established long-term stewardship programs to protect human health and the environment at sites where residual contamination remains after site cleanup. At the Idaho National Laboratory Site, Comprehensive Environmental Response, Compensation, and Liability Act (CERLA) long-term stewardship activities performed under the aegis of regulatory agreements, the Federal Facility Agreement and Consent Order for the Idaho National Laboratory, and state and federal requirements are administered primarily under the direction of the Idaho Cleanup Project. It represents a subset of all on-going environmental activity at the Idaho National Laboratory Site. This plan provides a listing of applicable CERCLA long-term stewardship requirements and their planned and completed implementation goals. It proffers the Long-Term Stewardship Environmental Data Warehouse for Sitewide management of environmental data. This plan will be updated as needed over time, based on input from the U.S. Department of Energy, its cognizant subcontractors, and other local and regional stakeholders.

  18. Environmental regulatory compliance plan, Deaf County site, Texas: Draft revision 1

    SciTech Connect

    Not Available

    1987-12-14

    The DOE is committed to conduct its operation in an environmentally safe and sound manner and comply with the letter and spirit of applicable environmental statues and regulations. These objectives are codified in DOE order N 5400.2, ''Environmental Policy Statement.'' This document, the Deaf Smith County site (Texas) Environmental Regulatory Compliance Plam (ERCP), is one means of implementing that policy. The ERCP describes the environmental regulatory requirements applicable to the Deaf Smith County site (Texas), and presented the framework within which the Salt Repository Project Office (SRPO) will comply with the requirements. The plan also discusses how DOE will address State and local environmental requirements. To achieve this purpose the ERCP will be developed in phases. This version of the ERCP is the first phase in the delopment of the ERCP. It represents the Salt Repository Project Office's understanding of environmental requirements for the site characterization phase of repository development. After consultation with the appropriate federal and state agencies and affected Indian tribes, the ERCP will be updated to reflect the results of consultation with these agencies and affected Indian tribes. 6 refs., 38 figs.

  19. I-SAVE conservation program. Implementing title II of NECPA residential conservation service. Final draft

    SciTech Connect

    1980-05-30

    The I-SAVE (Iowa Saves America's Vital Energy) conservation plan provides comprehensive energy-conservation information and services to residential consumers served by large investor-owned electric and gas utilities and participating home-heating suppliers. The overall objective of the I-SAVE plan is to conserve energy by facilitating cost-effective retrofit of existing housing and promoting more-efficient energy use. The ultimate benefit available to the customer under the I-SAVE plan - reduction in energy use - is dependent upon the action he or she takes as a result of the program audit. Benefits to the utility and the ratepayers as a whole, however, will accrue only upon widespread customer acceptance and utilization of program services. This degree of program acceptance and the resulting benefits to ratepayers can be attained only through an aggressive educational and promotional effort by the covered utilities. All electric and gas utilities which have sales, other than resale, exceeding 750 million kWh of electricity or 10 billion cubic feet of gas and participating home-heating suppliers, shall provide a program announcement and shall offer conservation services to their customers who occupy a residential building containing at least one, but not more than four units, in a manner as provided by the rules. The text of the rules is presented. (MCW)

  20. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    SciTech Connect

    Heinemann, J.L.

    1997-08-13

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP.

  1. Transportation control measure: State Implementation Plan guidance (revised final report)

    SciTech Connect

    Eisinger, D.S.; Deakin, E.A.; Mahoney, L.A.; Morris, R.E.; Ireson, R.G.

    1990-09-01

    The document has been developed for the United States Environmental Protection Agency to summarize current knowledge about transportation control measures (TCMs). The target audience includes transportation and air quality management staff at all government levels. The guidance development effort is motivated by the need to provide post-1987 guidance to attain National Ambient Air Quality Standards (NAAQS). The document provides descriptions and examples of the most frequently implemented TCMs; institutional guidance such as assessing feasibility, agency responsibilities, and funding; and techniques for monitoring and enforcing TCMs. In addition, the document describes the tools available for evaluating TCM impacts on hydrocarbons, nitrogen oxides, and carbon monoxide emissions. Appendices present approaches to estimate TCM effects on PM-10 emissions; important sources of additional information; implementation experiences in various cities; and rules of thumb to quantitatively evaluate TCM transportation system effects. The information presented demonstrates that there have been significant advances in TCM development over the past decade, and that TCMs are appropriate control options for state implementation plans.

  2. A draft of guidance from the scientific Research Programme GEOTECHNOLOGIEN to underpin the implementation of the CCS Directive in Germany

    NASA Astrophysics Data System (ADS)

    Streibel, Martin; Schoebel, Birgit

    2015-04-01

    In 2004 the Federal Ministry of Education and Research of Germany launched the programme GEOTECHNOLOGIEN with one key aspect being the development of technologies for sustainable storage of carbon dioxide in geological formations. Within this research field more than 30 projects in three consecutive programme phases have been funded up to the end of 2014. In order to benefit from the gathered knowledge and use the experiences for the policy/law making process the umbrella project AUGE has been launched in October 2012 with a life time of three years. The aim of the project is to review and compile all results of projects funded during the three phases to underpin the appendices of the German transposition of the EC Directive 2009/31/EC the "Carbon Dioxide Storage Law" (KSpG). The results of the projects have been structured along the lines of the two appendices of the KSpG which are similar to the ones of the EC Directive. The detailed structure follows the CSA Z741, Canada's first CCS standard for the geological storage of carbon emissions deep underground. This document also serves as the draft version for the ISO Technical Committee 265 "Carbon dioxide capture, transportation, and geological storage". From the risk management perspective, according to ISO 31000, most of the research performed in the above mentioned scientific programme dealt with contextual background of geological CO2 storage asking the question which physical, chemical and biological interactions of CO2 are most important to understand to evaluate if CO2 storage in general is feasible. This lead to risk identification, risk analysis and risk evaluation. Major topics of the scientific programme were • site characterisation with development and optimisation of laboratory procedures and implementation amongst other activities at the pilot site at Ketzin; • optimization of seismic procedures for site characterisation and the detection of injected CO2; • physical, chemical and microbiological

  3. 76 FR 38685 - Draft General Management Plan Amendment/Environmental Impact Statement, Tumacacori National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... associated mission resources. A general management plan (GMP) will establish the overall management direction... conditions, and the park would continue to be managed based on the GMP completed in 1996. This 1996 plan...

  4. Maintenance implementation plan for the Fast Flux Test Facility

    SciTech Connect

    Boyd, J.A.

    1997-01-30

    This plan implements the U.S. Department of Energy (DOE) 4330.4B, Maintenance Management Program (1994), at the Fast Flux Test Facility (FFTF). The FFTF is a research and test reactor located near Richland, Washington, and is operated under contract for the DOE by the B&W Hanford Company (BWHC). The intent of this Maintenance Implementation Plan (MIP) is to describe the manner in which the activities of the maintenance function are executed and controlled at the FFTF and how this compares to the requirements of DOE 4330.4B. The MIP ii a living document that is updated through a Facility Maintenance Self- Assessment Program. During the continuing self-assessment program, any discrepancies found are resolved to meet DOE 4330.4B requirements and existing practices. The philosophy of maintenance management at the FFTF is also describe within this MIP. This MIP has been developed based on information obtained from various sources including the following: * A continuing self-assessment against the requirements of the Conduct of Maintenance Order * In-depth reviews conducted by the members of the task team that assembled this MIP * Inputs from routine audits and appraisals conducted at the facility The information from these sources is used to identify those areas in which improvements could be made in the manner in which the facility conducts maintenance activities. The action items identified in Rev. 1 of the MIP have been completed. The MIP is arranged in six sections. Section I is this Executive Summary. Section 2 describes the facility and its 0683 history. Section 3 describes the philosophy of the graded approach and how it is applied at FFTF. Section 3 also discusses the strategy and the basis for the prioritizing resources. Section 4 contains the detailed discussion of `the elements of DOE 4330.4B and their state of implementation. Section 5 is for waivers and requested deviations from the requirements of the order. Section 6 contains a copy of the Maintenance

  5. 78 FR 18674 - Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ..., Development and Technology Strategic Plan (2013-2018) AGENCY: Research and Innovative Technology.... Department of Transportation, Research, Development and Technology Strategic Plan FY 2013-2018. The new five-year strategic plan will guide the Department's research, development, and technology activities...

  6. 75 FR 41512 - Draft Environmental Impact Statement/General Management Plan; Ross Lake National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... ``action'' alternatives that respond to both NPS planning requirements and to the public's concerns and... late September 2006 with release of an initial newsletter announcing onset of the planning process and... addition, the conservation planning effort was launched on the http://parkplanning.nps.gov/rola and...

  7. Urban Educational Planning and the Problems of Implementation

    ERIC Educational Resources Information Center

    Rieder, Corinne; Davidow, Harry

    1970-01-01

    The essay analyzes the demands and constraints on the planning process, discusses new efforts by the Educational Planning Section of the New York City Planning Department to fill the gaps in Planning, and suggests guidelines and criteria for its own future planning and for that of planning agencies in other large cities." (Author)

  8. Implementing the retrofitting plan for the European rail freight fleet

    NASA Astrophysics Data System (ADS)

    de Vos, P. H.; Bergendorff, M.; Brennan, M.; van der Zijpp, F.

    2006-06-01

    In 1998, the International Union of Railways (UIC) agreed on an Action Plan, proposing the retrofitting of the complete European rail freight fleet. Early 2003 the European Commission, Directorate General for Transport and Energy, commissioned the study reported here. The scope of the study was to supply an independent assessment of the conclusions of the UIC Action Plan and elaborate on implementation scenarios and funding options. The retrofitting of existing wagons, by an exchange of cast iron brake blocks with composition blocks, is the preferred option to achieve a substantial noise reduction. K-blocks have been homologated by UIC in 2003, but they require an expensive modification of the wagon. The opportunities for LL-blocks, an economically attractive alternative, are still being investigated to date. The retrofitting reflects some 600,000 wagons and, with an expected reduction of 10 dB(A), probably represents the largest single operation for traffic noise reduction ever. The process could best be combined with the maintenance cycle of freight wagons. In that case the process would require up to 10 years. Through a combination of funding options, the financial burden for wagons owners and freight operators could be softened.

  9. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    SciTech Connect

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  10. Y-12 Site environmental protection program implementation plan (EPPIP)

    SciTech Connect

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  11. 77 FR 64734 - Approval and Promulgation of Implementation Plans; North Dakota: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule.'' 75 FR 82536 (December... Plan Revisions Required for Greenhouse Gases,'' 75 FR 81874 (December 29, 2010); ``Action To Ensure... Greenhouse Gas Emissions: Federal Implementation Plan,'' 75 FR 82246 (December 30, 2010). Because...

  12. 76 FR 43963 - Regional Haze State Implementation Plan; State of Nevada; Extension of Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... plan. DATES: The comment period for the proposed rule published June 22, 2011 (76 FR 36450), is... AGENCY 40 CFR Part 51 Regional Haze State Implementation Plan; State of Nevada; Extension of Comment... (SIP) to implement the regional haze program for the first planning period through July 31, 2018....

  13. 40 CFR 49.10410 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Federally-promulgated regulations and Federal implementation plans. 49.10410 Section 49.10410 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  14. 40 CFR 49.10410 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Federally-promulgated regulations and Federal implementation plans. 49.10410 Section 49.10410 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  15. 76 FR 41075 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Indiana; Michigan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ...,'' 67 FR 80186 (December 31, 2002), as amended by 72 FR 32526 (June 13, 2007) (``NSR Reform''). In light... Plan; Call for Utah State Implementation Plan Revision,'' 74 FR 21639 (April 18, 2011). \\13\\ EPA has... Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule,'' 75 FR 82,536 (December 30,...

  16. Bandwith Implementation Plan, 2004-05: Learning in an Online World

    ERIC Educational Resources Information Center

    Ministerial Council on Education, Employment, Training and Youth Affairs (NJ1), 2004

    2004-01-01

    The July 2003 meeting of the Ministerial Council for Education, Employment Training and Youth Affairs (MCEETYA) endorsed the "National Bandwidth Action Plan--Learning in an online world 2003-06" as the basis for the development of the "National Implementation Plan." The "National Implementation Plan 2004-05" provides the detail critical to…

  17. 76 FR 12945 - Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... expected to implement them as part of their compliance with E.O. 13514. Authority: E.O. 13514, 74 FR 52117... QUALITY Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive... Adaptation Planning Implementing Instructions. SUMMARY: The Chair of the Council on Environmental...

  18. Transforming American Education: Learning Powered by Technology. National Educational Technology Plan, 2010. Draft

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The National Educational Technology Plan (NETP) presents a model of 21st century learning powered by technology, with goals and recommendations in five essential areas: learning, assessment, teaching, infrastructure, and productivity. The plan also identifies far-reaching "grand challenge problems" that should be funded and coordinated at a…

  19. Planning, Management and Evaluation: Realizing PIC Potential. Private Industry Council Guide. Working Draft.

    ERIC Educational Resources Information Center

    National Alliance of Business, Inc., Washington, DC.

    This Planning, Management, and Evaluation (PME) guide was developed by the National Alliance of Business as part of its program of management assistance for Private Industry Councils (PICs). The guide is a tool which PICs can use to improve their capability to plan, manage, and evaluate the programs which they administer, and to establish locally…

  20. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 8: Aerothermodynamics Automation and Robotics (A/R) systems sensors, high-temperature superconductivity

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity.