Opening Plenary Presentations from the Agencies at the 5th ESA Workshop
EPA and its federal partner held a two-day meeting that provided a forum for stakeholder suggestions for refining some of the interim scientific methods used in the recently released draft Biological Evaluations for three pilot chemicals
Closing Plenary Reports from Breakout Groups at the 5th ESA Workshop
EPA and its federal partner held a two-day meeting that provided a forum for stakeholder suggestions for refining some of the interim scientific methods used in the recently released draft Biological Evaluations for three pilot chemicals
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...
78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-04
...] Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing... Compounding Outsourcing Facilities Under Section 503B of the Federal Food, Drug, and Cosmetic Act.'' The draft... human drug compounders that choose to register as outsourcing facilities (outsourcing facilities). DATES...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... nuclear power plants. In response to a request from the Nuclear Energy Institute (NEI), the NRC is... NUCLEAR REGULATORY COMMISSION [NRC-2011-0191] Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft...
2014-08-01
of the GEGR pilot membrane coater; b) configuration of the coating station; and c) web path of the dip-knife coating process for RO membrane...Energy-dispersive X-ray spectroscopy EPA Environmental Protection Agency F:M Food-To-Microorganism Ratio FOB Forward Operating Base FT- IR Fourier...report 03/2014 3.3 Submit draft Interim report/Go No-Go decision point white paper 05/2013 3.4 Submit final report 05/2014 3.5 Final debrief
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...
1979-08-21
Appendix s - Outline and Draft Material for Proposed Triservice Interim Guideline on Application of Software Acceptance Criteria....... 269 Appendix 9...AND DRAFT MATERIAL FOR PROPOSED TRISERVICE INTERIM GUIDELINE ON APPLICATION OF SOFTWARE ACCEPTANCE CRITERIA I I INTRODUCTION The purpose of this guide...contract item (CPCI) (code) 5. CPCI test plan 6. CPCI test procedures 7. CPCI test report 8. Handbooks and manuals. Al though additional material does
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
...] RIN 1018-AX45 Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind... Register on February 18, 2011, announcing the availability for public comment of draft Land-Based Wind... Guidelines are intended to supersede the Service's 2003 voluntary, interim guidelines for land-based wind...
EPA Releases Draft Policy to Reduce Animal Testing for Skin Sensitization
The document, Draft Interim Science Policy: Use of Alternative Approaches for Skin Sensitization as a Replacement for Laboratory Animal Testing, describes the science behind the non-animal alternatives that can now be used to identify skin sensitization.
DOT National Transportation Integrated Search
2007-11-01
This interim report to Congress summarizes the progress and initial results of the Federal Highway Administrations (FHWA) and the four pilot communities participation in the Nonmotorized Transportation Pilot Program (NTPP) from its inception th...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Office of the Secretary Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan AGENCY: Department of Health and Human... Interim Implementation Guide for the National Health Security Strategy of the United States of America...
1981-04-01
east of Arcola Creek. The Interim Report gave a favorable recommendation for the harbor project and the results were published in House Document No. 91...Draft Reformulation Phase I GDM Re]port (Draft Stage 3 Report) The purpi se of this )rf t Stag. 3 Report Is to present the results of the Stage 3...Iirements for a small-boat harbor at Geneva State Park. Results of the bathymetric survey and sediment sampling program are presented in Appendix A. (3
Environmental Quality Technology Demonstration, Evaluation and Transfer Activities
1996-12-02
and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft
An Examination of the Perceived Importance of Technical Competence in Acquisition Project Management
1991-09-01
Develop (First Draft) Instructions Critique (Revision) Answerability Pilot Test (Second Draft) Analysis Response Mode Revision Useability Preparation...appropriate questionnaire items. Initially, the set of questions developed for the study reflected a few shortcomings. A pilot test of the first draft among...resulted. First, feedback from the pilot test indicated a need to reduce the completion time. Because the multiple choice format required several
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
The primary goals of the Texas Education Agency's Educational Technologies Providing Increased Learning Opportunities for Texas Students (Ed Tech PILOTS) are to employ technology to more efficiently and effectively delivery information to students and teachers to enhance the efficacy of classroom instruction. This interim report discusses the…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
... private pilot certificate and the instrument rating. These documents are available for public review... Airman Testing Standards and Training (2) Draft PRIVATE PILOT--AIRPLANE Airman Certification Standards; (3) Draft Change Tracking Matrix referenced to FAA-S-8081-14B, Private Pilot Practical Test Standards...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-24
...- 2011-0191. Address questions about NRC dockets to Carol Gallagher, telephone: 301-492-3668; e-mail...): Publicly available documents created or received at the NRC are available online in the NRC Library at http...-800-397-4209, 301-415-4737, or by e-mail to [email protected] . The draft LR-ISG proposes to revise...
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report of a pilot year impact study on evaluation methodology is part of a series of documents on the evaluation of Project Developmental Continuity, a Head Start demonstration program aimed at promoting educational and developmental continuity between children's Head Start and primary school experiences. This report deals with…
ERIC Educational Resources Information Center
Reumann-Moore, Rebecca; Lawrence, Nancy; Sanders, Felicia; Shaw, Kate; Christman, Jolley Bruce
2011-01-01
This document summarizes the findings from the initial round of research on the development and piloting of two types of instructional tools designed to support teachers' integration of the Common Core State Standards (CCSS) in literacy and math. In this interim report, Research for Action (RFA) presents key findings from the first half of the…
An Interim Report on NASA's Draft Space Technology Roadmaps
NASA Technical Reports Server (NTRS)
2011-01-01
NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13 Ground and Launch Systems Processing B Panel 2: Robotics, Communications, and Navigation TA04 Robotics, TeleRobotics, and Autonomous Systems TA05 Communication and Navigation Systems C Panel 3: Instruments and Computing TA08 Science Instruments, Observatories, and Sensor Systems TA11 Modeling, Simulation, Information Technology, and Data Processing D Panel 4: Human Health and Surface Exploration TA06 Human Health, Life Support, and Habitation Systems TA07 Human Exploration Destination Systems E Panel 5: Materials Panel TA10 Nanotechnology TA12 Materials, Structures, Mechanical Systems, and Manufacturing TA14 Thermal Management Systems F Panel 6: Entry, Descent, and Landing Panel TA09 Entry, Descent, and Landing Systems In addition to drawing on the expertise represented on the steering committee and panels, the committee obtained input from each of 14 public workshops held on each of the 14 roadmaps. At these 1-day workshops, invited speakers, guests, and members of the public engaged in discussions on the different technology areas and their value to NASA. Broad community input was also solicited from a public website, where more than 240 public comments were received on the draft roadmaps in response to application of criteria (such as benefit, risk and reasonableness, and alignment with NASA and national goals) that the steering committee established. This interim report reflects the results of deliberations by the steering committee in light of these public inputs as well as additional inputs from the six panels. The steering committee's final report will be completed early in 2012. That report will prioritize the technologies that span the entire scope of the 14 roadmaps and provide additional guidance on crosscutting themes and other relevant topics.
Re-use of pilot data and interim analysis of pivotal data in MRMC studies: a simulation study
NASA Astrophysics Data System (ADS)
Chen, Weijie; Samuelson, Frank; Sahiner, Berkman; Petrick, Nicholas
2017-03-01
Novel medical imaging devices are often evaluated with multi-reader multi-case (MRMC) studies in which radiologists read images of patient cases for a specified clinical task (e.g., cancer detection). A pilot study is often used to measure the effect size and variance parameters that are necessary for sizing a pivotal study (including sizing readers, non-diseased and diseased cases). Due to the practical difficulty of collecting patient cases or recruiting clinical readers, some investigators attempt to include the pilot data as part of their pivotal study. In other situations, some investigators attempt to perform an interim analysis of their pivotal study data based upon which the sample sizes may be re-estimated. Re-use of the pilot data or interim analyses of the pivotal data may inflate the type I error of the pivotal study. In this work, we use the Roe and Metz model to simulate MRMC data under the null hypothesis (i.e., two devices have equal diagnostic performance) and investigate the type I error rate for several practical designs involving re-use of pilot data or interim analysis of pivotal data. Our preliminary simulation results indicate that, under the simulation conditions we investigated, the inflation of type I error is none or only marginal for some design strategies (e.g., re-use of patient data without re-using readers, and size re-estimation without using the effect-size estimated in the interim analysis). Upon further verifications, these are potentially useful design methods in that they may help make a study less burdensome and have a better chance to succeed without substantial loss of the statistical rigor.
Meeting Materials from the 5th ESA Workshop
EPA and its federal partners, Fish and Wildlife Service and National Marine Fisheries Service, held a meeting for stakeholder suggestions for refining some of the interim scientific methods used in the recently released draft.
Telescience Testbed Pilot Program
NASA Technical Reports Server (NTRS)
Gallagher, Maria L. (Editor); Leiner, Barry M. (Editor)
1988-01-01
The Telescience Testbed Pilot Program is developing initial recommendations for requirements and design approaches for the information systems of the Space Station era. During this quarter, drafting of the final reports of the various participants was initiated. Several drafts are included in this report as the University technical reports.
Aeromedical Airlift -- Do the Pieces Fit?
1988-01-01
architecture analysis. feasibility study, and system design phase. To save money and time associated with unforeseen down-line modifications that may... loand Redietribution of Patients in CONUS. Draft Interim; Report No. IX-h. Maximnus, Inc., McLean Va.: Prepared for Office of the Assistant.Secretary of
ERIC Educational Resources Information Center
North Carolina State Dept. of Community Colleges, Raleigh.
A two-part articulation instructional objective guide for drafting (graphic communications) is provided. Part I contains summary information on seven blocks (courses) of instruction. They are as follow: introduction; basic technical drafting; problem solving in graphics; reproduction processes; freehand drawing and sketching; graphics composition;…
On January 11, 1995, EPA published a draft policy on Reduced Restricted Entry Intervals for Certain Pesticides, in the Federal Register. The final policy was published in the Federal Register on May 3, 1995. This Notice contains the final policy.
Describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
...: Draft Regulatory Guide DG-1237, ``Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors,'' Interim Staff Guidance (ISG) NSIR/DPR-ISG-01, ``Emergency Planning for Nuclear Power Plants... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-15
... determine appropriate permanent methods for correcting potential problems, interim risk reduction measures... Environmental Impact Statement for Dam Safety Study, Lake Lewisville Dam, Elm Fork Trinity River, Denton County... primary purposes of the project are flood risk management, [[Page 49736
76 FR 74831 - Aging Management of Stainless Steel Structures and Components in Treated Borated Water
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... exposed to treated borated water. In response to a request from the Nuclear Energy Institute (NEI), the... NUCLEAR REGULATORY COMMISSION [NRC-2011-0256] Aging Management of Stainless Steel Structures and Components in Treated Borated Water AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-13
... October 15, 2013. The Nuclear Energy Institute (NEI) submitted a letter on September 17, 2013 (Agencywide... NUCLEAR REGULATORY COMMISSION [NRC-2013-0212: NRC-2013-0211] Environmental Issues Associated With... AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; re-opening of comment period...
This document describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.
76 FR 35208 - Boott Hydropower, Inc.; Notice of Availability of Draft Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... of the wooden flashboards with a pneumatic crest gate system of the same height and interim modifications to the existing flashboard system and concludes that authorizing the amendment, with appropriate... in the Public Reference Room, or it may be viewed on the Commission's Web site at http://www.ferc.gov...
75 FR 41872 - Advisory Commission on Childhood Vaccines; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-19
... Commission on Childhood Vaccines; Notice of Meeting SUMMARY: In accordance with section 10(a)(2) of the... is hereby giving notice that the Advisory Commission on Childhood Vaccines (ACCV) will hold a special...: This is a special meeting of the ACCV. Discussions will surround the draft interim influenza vaccine...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-13
... to issue orders) with respect to the supervision of SLHCs and their non-depository subsidiaries... notice of intent also advised that the Board would issue an interim final rule to effectuate the... elimination of requirements in OTS rules for prefiling meetings and submission of draft business plans, and...
78 FR 49782 - Interim Staff Guidance on Changes During Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-15
... seven comments on the Draft ISG from the Nuclear Energy Institute (NEI) (ADAMS Accession No. ML12089A019... construction impacts evaluation and the 10 CFR 50.59- like review (including applicability determination..., the construction impacts evaluation and the 10 CFR 50.59 and 10 CFR 50-59-like evaluation (including...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
.... Discussion Uranium recovery facility licensees, including in-situ recovery facilities and conventional... Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance AGENCY... Staff Guidance, ``Evaluations of Uranium Recovery Facility Surveys of Radon and Radon Progeny in Air and...
77 FR 5281 - State-of-the-Art Reactor Consequence Analyses Reports
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
... Analyses Reports AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; public meeting and request for... release of Draft NUREG-1935, ``State-of-the-Art Reactor Consequence Analyses (SOARCA) Report,'' for public comment. The purpose of Draft NUREG-1935 is to report a pilot study of best estimate analyses of the...
Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David
2015-01-01
Since the publication of Standards for Quality Improvement Reporting Excellence (SQUIRE 1.0) guidelines in 2008, the science of the field has advanced considerably. In this manuscript we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015, using 1) semistructured interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group; 2) two face-to-face consensus meetings to develop interim drafts; and 3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasizes the reporting of three key components of systematic efforts to improve the quality, value, and safety of health care: the use of formal and informal theory in planning, implementing, and evaluating improvement work; the context in which the work is done; and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve health care, recognizing that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (www.squire-statement.org). PMID:26517437
Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David
2015-01-01
In the past several years, the science of health care improvement has advanced considerably. In this article, we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015 using (1) interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group, (2) face-to-face consensus meetings to develop interim drafts, and (3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasizes 3 key components of systematic efforts to improve the quality, value, and safety of health care: formal and informal theory in planning, implementing, and evaluating improvement work; the context in which the work is done; and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve health care, recognizing that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (www.squire-statement.org). © The Author(s) 2015.
Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David
2015-01-01
Since the publication of Standards for Quality Improvement Reporting Excellence (SQUIRE 1.0) guidelines in 2008, the science of the field has advanced considerably. In this manuscript we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015, using 1) semistructured interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group; 2) two face-to-face consensus meetings to develop interim drafts; and 3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasizes the reporting of three key components of systematic efforts to improve the quality, value, and safety of health care: the use of formal and informal theory in planning, implementing, and evaluating improvement work; the context in which the work is done; and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve health care, recognizing that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (www.squire-statement.org).
Interim Report on the Evaluation of the Growth Model Pilot Project
ERIC Educational Resources Information Center
Hoffer, Thomas B.; Hedberg, E. C.; Brown, Kevin L.; Halverson, Marie L.; McDonald, Sarah-Kathryn
2010-01-01
The Growth Model Pilot Project (GMPP) was initiated to allow states to experiment with adjustments to the No Child Left Behind Act (NCLB) status accountability system in order to improve the validity of AYP determinations by giving schools credit for students who are making significant growth. The pilot allowed states, districts, and schools to…
An Interim Report on Pennsylvania's Framework for Leadership: Frequently Asked Questions
ERIC Educational Resources Information Center
Bing-ru, Teh; Chiang, Hanley; Lipscomb, Stephen; Gill, Brian
2014-01-01
A new study analyzed data from the 2012/13 pilot of the Framework for Leadership (FFL), Pennsylvania's tool for evaluating the leadership practices of principals and assistant principals. Based on the FFL scores of 336 principals and 69 assistant principals evaluated by their supervisors in the 2012/13 school year, this interim report found that…
Home Start Evaluation Study. Interim Report II: Program Analysis. Revised Draft.
ERIC Educational Resources Information Center
Deloria, Dennis; And Others
This document is the second in a series of evaluative reports directed to evaluation needs of Home Start planners and administrators. It focuses on implementation data about programs gathered during local site visits conducted in the spring and fall of 1972. The two basic evaluative questions asked are: (1) What was Home Start intended by its…
Draft Final Risk Assessment Lime Settling Basins. Version 2.1
1990-10-25
TABLE OF CON "S Section Page EXECUTIVE SUMMARY ...................................... v 1.0 INTRODUCTION ..................................... 1 - 1 1.1...BACKGROUND AND RATIONALE ........................ 1 - 1 1.2 SUMMARY OF APPROACH ............................. 1 -3 1.3 REPORT FORMAT... 1 -4 2.0 SITE DESCRIPTION AND HISTORY ......................... 2- 1 3.0 PREFERRED ALTERNATIVE INTERIM ACTION TECHNOLOGY ..... 3- 1 4.0
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... Experience.'' This LR-ISG provides guidance and clarification concerning ongoing review of plant-specific and... plants. As noticed on September 20, 2011 (76 FR 58311), the public comment period was extended and, as of... to communicate insights and lessons learned and to address emergent issues not covered in license...
ERIC Educational Resources Information Center
Wholeben, Brent E.
This volume is an exposition of a mathematical modeling technique for use in the evaluation and solution of complex educational problems at all levels. It explores in detail the application of simple algebraic techniques to such issues as program reduction, fiscal rollbacks, and computer curriculum planning. Part I ("Introduction to the…
ERIC Educational Resources Information Center
Wholeben, Brent E.; Sullivan, John M.
This report provides an extensive discussion of the use of criterion referenced, mathematical modeling procedures to determine which budget reductions minimize reduction in the quality of educational programs. Part I, "Evaluation of Potential Budgeting Roll-backs under Educational Fiscal Crisis," explains the basic design of multiple…
Human Factors Experiments for Data Link : Interim Report No. 3
DOT National Transportation Integrated Search
1973-08-01
The results of three experiments involving eight FAA NAFEC test pilots are reported. Section I describes the evaluation of four prototype Data Link displays in a GAT-1 simulator. While there was lack of agreement among the pilots as to the relative m...
ERIC Educational Resources Information Center
Logistics Management Inst., Washington, DC.
The Federal Aviation Administration of the Department of Transportation controls civilian pilot training. Through its regulations and testing and licensing procedures, the FAA sets minimum criteria for course content and knowledge and skill acquisition. Since few training organizations have the economic resources required to do original research…
Human Factors Experiments for Data Link : Interim Report No. 5
DOT National Transportation Integrated Search
1975-02-01
One and two-man crews of general aviation pilots and two-man crews of FAA/NAFEC test pilots made a series of simulated flights in a GAT-2 simulator to evaluate various complements of I/O equipment for Data Link. In the earlier experiments in the seri...
EPA's Science Plan for Activities Related to Dioxins in the ...
The U.S. Environmental Protection Agency is currently addressing several issues related to dioxins and dioxin-like chemicals in the environment. These include the comprehensive human health and exposure assessment for dioxin, commonly called the dioxin reassessment and a review of dioxin soil clean-up levels currently in use across the United States. To move forward with both of these efforts, as well as other dioxin related activities, a plan with interim milestones has been developed and it is outlined below. EPA’sExposure and Human Health Reassessment of 2,3,7,8-Tetrachlorodibenzo-p-Dioxin(TCDD) and Related Compounds; Response to NAS and Completion of Dioxin Reassessment 1. EPA will release a draft report that responds to the recommendations and comments included in the National Academy of Sciences’ (NAS) 2006 review of EPA’s 2003 draft dioxin reassessment. UPDATED May 21, 2010: The draft response to comments report titled EPA’s Reanalysis of Key Issues Related to Dioxin Toxicity and Response to NAS Comments (External Review Draft) (“Draft Dioxin Reanalysis”) was completed and released for public review and comment on May 21, 2010. EPA’s National Center for Environment Assessment (NCEA) in the Office of Research and Development, will prepare a limited response to key comments and recommendations in the NAS report (draft response to comments report). The draft response will focus on dose-response
ERIC Educational Resources Information Center
Gephart, William J.
The paper discusses the meaning of value and valuing, their roles in evaluation, and the potency of value systems in problem solving logic. Evaluation is defined as a process for facilitating decision making. A decision making situation occurs when there are options which are impossible to treat equivalently, and there is an impact in the…
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical search requirements. 8.5 Section 8.5 Energy NUCLEAR REGULATORY... 0220, Draft Interim Acceptance Criteria for a Physical Security Plan for Nuclear Power Plants (March...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical search requirements. 8.5 Section 8.5 Energy NUCLEAR REGULATORY... 0220, Draft Interim Acceptance Criteria for a Physical Security Plan for Nuclear Power Plants (March...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical search requirements. 8.5 Section 8.5 Energy NUCLEAR REGULATORY... 0220, Draft Interim Acceptance Criteria for a Physical Security Plan for Nuclear Power Plants (March...
DOT National Transportation Integrated Search
2016-08-11
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
Pilot-scale treatability test plan for the 200-BP-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less
Yucca Mountain nuclear waste repository prompts heated congressional hearing
NASA Astrophysics Data System (ADS)
Showstack, Randy
2011-11-01
Although the final report of the Blue Ribbon Commission on America's Nuclear Future is not expected until January 2012, the tentative conclusions of the commission's draft report were dissected during a recent joint hearing by two subcommittees of the House of Representatives' Committee on Science, Space, and Technology. Among the more heated issues debated at the hearing was the fate of the stalled Yucca Mountain nuclear waste repository in Nevada. The Blue Ribbon Commission's (BRC) draft report includes recommendations for managing nuclear waste and for developing one or more permanent deep geological repositories and interim storage facilities, but the report does not address the future of Yucca Mountain. The BRC charter indicates that the commission is to "conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle." However, the draft report states that the commission was not asked to consider, and therefore did not address, several key issues. "We have not rendered an opinion on the suitability of the Yucca Mountain site or on the request to withdraw the license application for Yucca Mountain," the draft report states.
ERIC Educational Resources Information Center
Carmichael, Sheila Byrd; Wilson, W. Stephen; Finn, Chester E., Jr.; Winkler, Amber M.; Palmieri, Stafford
2009-01-01
Subject-matter experts reviewed the content, rigor, and clarity of the first public drafts of the "Common Core" standards released in September 2009 by the Common Core State Standards Initiative (CCSSI) of the National Governors Association and Council of Chief State School Officers. Using the same criteria, the same experts also…
Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David
2016-02-01
Since the publication of Standards for QUality Improvement Reporting Excellence (SQUIRE 1.0) guidelines in 2008, the science of the field has advanced considerably. In this article, we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015 using (1) semistructured interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group, (2) two face-to-face consensus meetings to develop interim drafts, and (3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasizes the reporting of three key components of systematic efforts to improve the quality, value, and safety of health care: the use of formal and informal theory in planning, implementing, and evaluating improvement work; the context in which the work is done; and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve health care, recognizing that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (www.squire-statement.org). Copyright © 2016 The Authors. Published by Elsevier Inc. All rights reserved.
Fiscal year 1981 US corn and soybeans pilot preliminary experiment plan, phase 1
NASA Technical Reports Server (NTRS)
Livingston, G. P.; Nedelman, K. S.; Norwood, D. F.; Smith, J. H. (Principal Investigator)
1981-01-01
A draft of the preliminary experiment plan for the foreign commodity production forecasting project fiscal year 1981 is presented. This draft plan includes: definition of the phase 1 and 2 U.S. pilot objectives; the proposed experiment design to evaluate crop calendar, area estimation, and area aggregation components for corn and soybean technologies using 1978/1979 crop-year data; a description of individual sensitivity evaluations of the baseline corn and soybean segment classification procedure; and technology and data assessment in support of the corn and soybean estimation technology for use in the U.S. central corn belt.
ERIC Educational Resources Information Center
Cook, Desmond L.
This document, one of a series of reports examining the possible contribution of other disciplines to evaluation methodology, describes the major elements of general systems theory (GST), cybernetics theory (CT) and management control theory (MCT). The author suggests that MCT encapsulates major concerns of evaluation since it reveals that…
ERIC Educational Resources Information Center
Liberman, Akiva; Cahill, Meagan; Cramer, Lindsey
2012-01-01
The Case Management Partnership Initiative (CMPI) addresses chronic truancy by linking truant ninth graders and their families to social services and case management, along with regular interagency case management meetings. A pilot was conducted at Anacostia and Ballou High Schools in 2011-2012. The implementation evaluation found that the pilot…
Internal pilots for a class of linear mixed models with Gaussian and compound symmetric data
Gurka, Matthew J.; Coffey, Christopher S.; Muller, Keith E.
2015-01-01
SUMMARY An internal pilot design uses interim sample size analysis, without interim data analysis, to adjust the final number of observations. The approach helps to choose a sample size sufficiently large (to achieve the statistical power desired), but not too large (which would waste money and time). We report on recent research in cerebral vascular tortuosity (curvature in three dimensions) which would benefit greatly from internal pilots due to uncertainty in the parameters of the covariance matrix used for study planning. Unfortunately, observations correlated across the four regions of the brain and small sample sizes preclude using existing methods. However, as in a wide range of medical imaging studies, tortuosity data have no missing or mistimed data, a factorial within-subject design, the same between-subject design for all responses, and a Gaussian distribution with compound symmetry. For such restricted models, we extend exact, small sample univariate methods for internal pilots to linear mixed models with any between-subject design (not just two groups). Planning a new tortuosity study illustrates how the new methods help to avoid sample sizes that are too small or too large while still controlling the type I error rate. PMID:17318914
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
.... Name of Project: Humboldt WaveConnect Pilot Project. f. Location: The project would be located in the... Commission must include on the first page, the project name (Humboldt WaveConnect Pilot Project) and number (P-12779-005), and bear the heading ``Comments on the proposed Humboldt WaveConnect Pilot Project...
DOT National Transportation Integrated Search
2016-08-12
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
1982-06-01
these conditions . Therefore, the no-action plan is not being recommended. With the present channel conditions and anticipated slow growth for... conditions very similar to those of today. No ocean disposal is anticipated. Because no significant growth in socioeconomic activity is expected without...accuracy; however, project construction provides conditions favorable for growth . The service industry would be expected to closely follow any increase
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryan, Charles R.; Enos, David
2014-09-01
This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of used nuclear fuel. The work involves both characterization of the potential physical and chemical environment on the surface of the storage canisters and how it might evolve through time, and testing to evaluate performance of the canister materials under anticipated storage conditions.
ERIC Educational Resources Information Center
Martin, Elizabeth L.; Waag, Wayne L.
A transfer-of-training design was used to evaluate the contributions of simulator training with synergistic six-degrees-of-freedom platform motion to aerobatic skills acquisition in the novice pilot. Thirty-six undergraduate pilot trainees were randomly assigned to one of three treatment groups: motion, no-motion, and control. Those in the control…
Liquid circulation in a stirred system with an axial flow impeller and a cylindrical draft tube
NASA Astrophysics Data System (ADS)
Fořt, Ivan; Vlček, Petr; Jirout, Tomáš
2017-07-01
This study deals with a CFD simulation of the turbulent flow of a homogeneous liquid in a cylindrical stirred system with a pitched-blade impeller and a cylindrical draft tube. Design of investigated pilot plant equipment corresponds to the shape of agitated crystallizer with a draft tube - additional cooling heat exchanger. The results of the computation are expressed by means of the circulation pattern of a stirred liquid and the main flow characteristics of the system - the flow rate numbers and the impeller power number.
Building a Greenway: Using EnviroAtlas in the Classroom. CASE STUDY
In this hypothetical case study, funding to complete a pilot section of a greenway has been granted to a city Parks and Recreation Department. The proposed pilot section is being presented to the city council for review and approval. The proposal was drafted by the Parks and Recr...
77 FR 25165 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
.... EIS No. 20120117, Draft EIS, BLM, WY, Lost Creek In Situ Recovery Project, To Analyze the Site... agencies to participate in its e-NEPA electronic EIS submission pilot. Participating agencies can fulfill... filing documents online and providing feedback on the process. To participate in the pilot, register at...
Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David
2016-12-01
Since the publication of Standards for QUality Improvement Reporting Excellence (SQUIRE 1.0) guidelines in 2008, the science of the field has advanced considerably. In this manuscript, we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015 using (1) semistructured interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group, (2) two face-to-face consensus meetings to develop interim drafts and (3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasises the reporting of three key components of systematic efforts to improve the quality, value and safety of healthcare: the use of formal and informal theory in planning, implementing and evaluating improvement work; the context in which the work is done and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve healthcare, recognising that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (http://www.squire-statement.org). Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.
ERIC Educational Resources Information Center
Smith, Richard J.; Sauer, Mardelle A.
This guide is intended to assist teachers in using computer-aided design (CAD) workstations and artificial intelligence software to teach basic drafting skills. The guide outlines a 7-unit shell program that may also be used as a generic authoring system capable of supporting computer-based training (CBT) in other subject areas. The first section…
2006-10-01
for UAS pilot applicants to complete a limited period of manned aircraft flight training early in their training pipeline. Subsequently, there will...applicable for the initial period of manned aircraft flight training: Federal Aviation Administration third class medical standards or AF148-123V3... flight training could not be adequately addressed during training with unmanned aircraft. In the interim, the USAF has decided manned aircraft training is
2015-12-01
the MIS System/Subsystem Specification ( SSS ), and supplementary BAA document. On June 26, 2014, the SEI provided a draft interim report of the...findings and issues. The SEI team also received July 3, 2014, versions of the MIS Stakeholder Requirements, MIS SSS , and build plan and July 17, 2014...versions of the MIS SSS together with the MIS system model. On July 14–15, 2014, the SEI presented a summary of the issues at the two contractors
Making medical records professional(s).
Mason, A
1987-07-01
In 1986 a joint medical records project group was set up by the Institute of Health Services Management, the Association of Health Care Information and Medical Records Officers and the NHS Training Authority, with Mr Vic Peel as chairman. The group was supported by Arthur Andersen & Co, management consultants. The following is a shortened and edited version of an interim report drafted for the group by Dr Alastair Mason. It is intended for discussion and does not yet represent the definitive views of the sponsoring bodies.
Draft Plan of Operation for a Functional Literacy Pilot Program in Swaziland June-July 1971.
ERIC Educational Resources Information Center
Sebenta National Inst. (Swaziland).
A planned full-time "functional literacy" course that was to be held during June and July 1971 in Ekuhlamukeni and Nqabaneni (Swaziland) is discussed. The experimental pilot project was to be sponsored by the Sebenta National Institute, the University of Botswana, Lesotho and Swaziland Division of Extra Mural Services, and by the…
75 FR 30386 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-01
... updates on Voting System Testing and Certification programs, including UOCAVA Pilot Program Voting Systems... Voting Systems Threat Analysis. The Board will receive updates on research and studies, including draft...
41 CFR 102-37.230 - What must a letter of intent for obtaining surplus aircraft or vessels include?
Code of Federal Regulations, 2011 CFR
2011-01-01
..., name, class, size, displacement, length, beam, draft, lift capacity, and the hull or registry number... cannibalization process, how recovered parts are to be used, method of accounting for usable parts, disposition of... pilot(s) and where the vessel will be docked. If a vessel is requested for permanent docking on water or...
41 CFR 102-37.230 - What must a letter of intent for obtaining surplus aircraft or vessels include?
Code of Federal Regulations, 2012 CFR
2012-01-01
..., name, class, size, displacement, length, beam, draft, lift capacity, and the hull or registry number... cannibalization process, how recovered parts are to be used, method of accounting for usable parts, disposition of... pilot(s) and where the vessel will be docked. If a vessel is requested for permanent docking on water or...
41 CFR 102-37.230 - What must a letter of intent for obtaining surplus aircraft or vessels include?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., name, class, size, displacement, length, beam, draft, lift capacity, and the hull or registry number... cannibalization process, how recovered parts are to be used, method of accounting for usable parts, disposition of... pilot(s) and where the vessel will be docked. If a vessel is requested for permanent docking on water or...
41 CFR 102-37.230 - What must a letter of intent for obtaining surplus aircraft or vessels include?
Code of Federal Regulations, 2014 CFR
2014-01-01
..., name, class, size, displacement, length, beam, draft, lift capacity, and the hull or registry number... cannibalization process, how recovered parts are to be used, method of accounting for usable parts, disposition of... pilot(s) and where the vessel will be docked. If a vessel is requested for permanent docking on water or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-25
... Application for a Pilot Project a. Type of Application: Draft Pilot License Application. b. Project No.: 13015... either a 3.5-mile-long, or a 5- mile-long submarine cable with two 13.8-kilovolt (kv) transmission lines and a 4.0-kv transmission line connecting the turbine generation units to an onshore substation...
NASA Technical Reports Server (NTRS)
Wolfe, R. R.
1975-01-01
Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.
1989-04-01
and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan addresses...totaltriThelomethanes radmiutm CD 10(1) 5 .13)* 10(4 Larbon tetrachloride CCL4 0(3)5.4 ’tordane CDN0.004(l) 0.00046(5) CLI3oride CL 250,000(l...numerous carcinogenicity tests in a variety of animals indicate that dieldrin promotes only liver tumors and the tumors develop only in mice. On the basis of
Interim Draft: Biological Sampling and Analysis Plan Outline ...
Standard Operation Procedures This interim sampling and analysis plan (SAP) outline was developed specifically as an outline of the output that will be generated by a developing on-line tool called the MicroSAP. The goal of the MicroSAP tool is to assist users with development of SAPs needed for site characterization, verification sampling, and post decontamination sampling stages of biological sampling and analysis activities in which the EPA would be responsible for conducting sampling. These activities could include sampling and analysis for a biological contamination incident, a research study, or an exercise. The development of this SAP outline did not consider the initial response of an incident, as it is assumed that the initial response would have been previously completed by another agency during the response, or the clearance phase, as it is assumed that separate committee would be established to make decisions regarding clearing a site. This outline also includes considerations for capturing the associated data quality objectives in the SAP.
Annual report of groundwater monitoring at Centralia, Kansas, in 2010.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twicemore » yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation processes (reductive dechlorination) in the subsurface environment (Argonne 2006, 2007a, 2008a). The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound, in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was talking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) requested that sitewide monitoring continue until a final remedy is selected (as part of a Corrective Action Study [CAS] evaluation) and implemented. In response to this request, the established sampling across the site and additional sampling in the IM pilot test area continued in 2008 (Argonne 2008b, 2009a,b). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program for both the wider site and the IM pilot test area (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve monitoring points across the site (Figure 1.1) and five outlying IM pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.2); and (2) Twice yearly sampling of five IM pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.2). With the approval of the KDHE (2009), the initial groundwater sampling for VOCs and geochemical analyses under the interim monitoring plan outlined above was conducted in 2009 (Argonne 2010). The present report documents the findings of the 2010 monitoring events, conducted on April 5 and September 19-21, 2010.« less
Pilot-Induced Oscillations and Human Dynamic Behavior
NASA Technical Reports Server (NTRS)
McRuer, Duane T.
1995-01-01
This is an in-depth survey and study of pilot-induced oscillations (PIO's) as interactions between human pilot and vehicle dynamics; it includes a broad and comprehensive theory of PIO's. A historical perspective provides examples of the diversity of PIO's in terms of control axes and oscillation frequencies. The constituents involved in PIO phenomena, including effective aircraft dynamics, human pilot dynamic behavior patterns, and triggering precursor events, are examined in detail as the structural elements interacting to produce severe pilot-induced oscillations. The great diversity of human pilot response patterns, excessive lags and/or inappropriate gain in effective aircraft dynamics, and transitions in either the human or effective aircraft dynamics are among the key sources implicated as factors in severe PIO's. The great variety of interactions which may result in severe PIO's is illustrated by examples drawn from famous PIO's. These are generalized under a pilot-behavior-theory-based set of categories proposed as a classification scheme pertinent to a theory of PIO's. Finally, a series of interim prescriptions to avoid PIO is provided.
Refining a taxonomy for guideline implementation: results of an exercise in abstract classification
2013-01-01
Background To better understand the efficacy of various implementation strategies, improved methods for describing and classifying the nature of these strategies are urgently required. The aim of this study was to develop and pilot the feasibility of a taxonomy to classify the nature and content of implementation strategies. Methods A draft implementation taxonomy was developed based on the Cochrane Effective Practice and Organisation of Care (EPOC) data collection checklist. The draft taxonomy had four domains (professional, financial, organisational and regulatory) covering 49 distinct strategies. We piloted the draft taxonomy by using it to classify the implementation strategies described in the conference abstracts of the implementation stream of the 2010 Guideline International Network Conference. Five authors classified the strategies in each abstract individually. Final categorisation was then carried out in a face-to-face consensus meeting involving three authors. Results The implementation strategies described in 71 conference abstracts were classified. Approximately 15.5% of abstracts utilised strategies that could not be categorised using the draft taxonomy. Of those strategies that could be categorised, the majority were professionally focused (57%). A total of 41% of projects used only one implementation strategy, with 29% using two and 31% three or more. The three most commonly used strategies were changes in quality assurance, quality improvement and/or performance measurement systems, changes in information and communication technology, and distribution of guideline materials (via hard-copy, audio-visual and/or electronic means). Conclusions Further refinement of the draft taxonomy is required to provide hierarchical dimensions and granularity, particularly in the areas of patient-focused interventions, those concerned with audit and feedback and quality improvement, and electronic forms of implementation, including electronic decision support. PMID:23497520
Refining a taxonomy for guideline implementation: results of an exercise in abstract classification.
Mazza, Danielle; Bairstow, Phillip; Buchan, Heather; Chakraborty, Samantha Paubrey; Van Hecke, Oliver; Grech, Cathy; Kunnamo, Ilkka
2013-03-15
To better understand the efficacy of various implementation strategies, improved methods for describing and classifying the nature of these strategies are urgently required. The aim of this study was to develop and pilot the feasibility of a taxonomy to classify the nature and content of implementation strategies. A draft implementation taxonomy was developed based on the Cochrane Effective Practice and Organisation of Care (EPOC) data collection checklist. The draft taxonomy had four domains (professional, financial, organisational and regulatory) covering 49 distinct strategies. We piloted the draft taxonomy by using it to classify the implementation strategies described in the conference abstracts of the implementation stream of the 2010 Guideline International Network Conference. Five authors classified the strategies in each abstract individually. Final categorisation was then carried out in a face-to-face consensus meeting involving three authors. The implementation strategies described in 71 conference abstracts were classified. Approximately 15.5% of abstracts utilised strategies that could not be categorised using the draft taxonomy. Of those strategies that could be categorised, the majority were professionally focused (57%). A total of 41% of projects used only one implementation strategy, with 29% using two and 31% three or more. The three most commonly used strategies were changes in quality assurance, quality improvement and/or performance measurement systems, changes in information and communication technology, and distribution of guideline materials (via hard-copy, audio-visual and/or electronic means). Further refinement of the draft taxonomy is required to provide hierarchical dimensions and granularity, particularly in the areas of patient-focused interventions, those concerned with audit and feedback and quality improvement, and electronic forms of implementation, including electronic decision support.
Junior high school occupant protection materials
DOT National Transportation Integrated Search
1989-09-06
Based on a review of existing occupant protection materials, discussions with panel of subject experts and teachers, and a series of pilot tests, a set of (draft) curriculum materials on occupant safety was developed for junior high school students. ...
ERIC Educational Resources Information Center
Moore, Vanessa; McConachie, Helen
This study investigated variables that might be associated with outcome differences in language development of 10 children (ages 10-20 months) with blindness or severe visual impairments, attending a developmental vision clinic in southern England. Subjects' early patterns of expressive language development were examined and related to observed…
Editing Tips for Technical Publications in the Joint Nuclear Weapons Publication System (JNWPS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
ALLEN, TARA S.
2002-12-01
These editing tips contain helpful suggestions to assist writers who are writing, editing, and publishing technical publications in the JNWPS. The suggestions clarify some of the most common writing problems and requirements of two publications used in the JNWPS: ''DOE-DTRA TP 1-1, Joint Nuclear Weapons Publications System Operating Procedures, Specifications, and Standards, and United States Government Printing Office Style Manual''. Topics include requirements for abbreviations, formats for drafts, layouts of illustrations and tables, appropriate wording for interim changes, guidance for creating a list of effective pages, how to insert and delete pages and paragraphs, referencing other technical publications, use ofmore » revision bars, requirements for safety precautions, use of hyphens, and how to place warnings, cautions, and notes. Also included are a writer's checklist, samples of draft title pages, and a section of helpful tips for the writers who use the department's desktop publishing software program, Adobe{reg_sign} FrameMaker{reg_sign}.« less
NASA Technical Reports Server (NTRS)
Davidson, Frederic M.; Sun, Xiaoli; Field, Christopher T.
1995-01-01
This Interim report consists of a manuscript, 'Receiver Design for Satellite to Satellite Laser Ranging Instrument,' and copies of two papers we co-authored, 'Demonstration of High Sensitivity Laser Ranging System' and 'Semiconductor Laser-Based Ranging Instrument for Earth Gravity Measurements. ' These two papers were presented at the conference Semiconductor Lasers, Advanced Devices and Applications, August 21 -23, 1995, Keystone Colorado. The manuscript is a draft in the preparation for publication, which summarizes the theory we developed on space-borne laser ranging instrument for gravity measurements.
Skate Genome Project: Cyber-Enabled Bioinformatics Collaboration
Vincent, J.
2011-01-01
The Skate Genome Project, a pilot project of the North East Cyber infrastructure Consortium, aims to produce a draft genome sequence of Leucoraja erinacea, the Little Skate. The pilot project was designed to also develop expertise in large scale collaborations across the NECC region. An overview of the bioinformatics and infrastructure challenges faced during the first year of the project will be presented. Results to date and lessons learned from the perspective of a bioinformatics core will be highlighted.
Evaluation of In Harmony: Year 1. Interim Report
ERIC Educational Resources Information Center
Lord, Pippa; Sharp, Caroline; Dawson, Anneka; Mehta, Palak; White, Richard; Jeffes, Jennifer
2013-01-01
Arts Council England (ACE) commissioned NFER to undertake the national evaluation of the In Harmony social and music education programme 2012-2015. In Harmony is funded by the Department for Education (DfE) and ACE, and is currently being piloted in six areas. The evaluation is investigating the range and extent of impacts on children, families,…
An Evaluation of ESEA Title III Projects, Fiscal Year 1972. Interim Report.
ERIC Educational Resources Information Center
Wilson, Jerusa; And Others
This report contains descriptions and progress of five projects in the District of Columbia partially or wholly funded by ESEA Title III: (1) The Columbia Road Preschool Pilot Project, a second-year experimental effort designed to serve as a model school providing an experimental setting for early childhood educational programs; (2) The Montessori…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-10
... 1094. The current pilot expires on September 15, 2010. The text of the proposed rule change is..., enumerated in full in Rule 1094(b)(ii): (i) The orders of the Sponsored Participant are binding in all... rules accordingly. In the interim, the Exchange believes that making its Rule 1094 permanent sends a...
An Information Storage and Retrieval System for Biological and Geological Data. Interim Report.
ERIC Educational Resources Information Center
Squires, Donald F.
A project is being conducted to test the feasibility of an information storage and retrieval system for museum specimen data, particularly for natural history museums. A pilot data processing system has been developed, with the specimen records from the national collections of birds, marine crustaceans, and rocks used as sample data. The research…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... guidance document, and pilot monitoring study can be directed to Mr. Nealson Watkins at 919-541-5522 or watkins[email protected] . Availability of Meeting Materials: The EPA draft guidance documents are posted...
77 FR 37672 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... EIS, NOAA, AS, Fagatele Bay National Marine Sanctuary Management Plan, Implementation, Tutuila Island.... 20120195, Draft EIS, NPS, FL, Fort Matanzas National Monument General Management Plan, Implementation, St... filing documents online and providing feedback on the process. To participate in the pilot, register at...
A New Concept: Use of Negotiations in the Hazardous Waste Facility Permitting Process in New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, G.J.; Rose, W.M.; Domenici, P.V.
This paper describes a unique negotiation process leading to authorization of the U.S. Department of Energy (DOE) to manage and dispose remote-handled (RH) transuranic (TRU) mixed wastes at the Waste Isolation Pilot Plant (WIPP). The negotiation process involved multiple entities and individuals brought together under authority of the New Mexico Environment Department (NMED) to discuss and resolve technical and facility operational issues flowing from an NMED-issued hazardous waste facility Draft Permit. The novel negotiation process resulted in numerous substantive changes to the Draft Permit, which were ultimately memorialised in a 'Draft Permit as Changed'. This paper discusses various aspects ofmore » the negotiation process, including events leading to the negotiations, regulatory basis for the negotiations, negotiation participants, and benefits of the process. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampledmore » twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) has requested that sitewide monitoring continue at Centralia until a final remedy has been selected (as part of a Corrective Action Study [CAS] evaluation) and implemented for this site. In response to this request, twice-yearly sampling of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for monitoring of the groundwater at Centralia (KDHE 2005a,b) was continued in 2008. The sampling events under this extension of the two-year (2005-2007) monitoring program occurred in March and September 2008 (Argonne 2008b, 2009b). Additional piezometers specifically installed to evaluate the progress of the IM pilot test (PMP1-PMP9; Figure 1.2) were also sampled in 2008; the results of these analyses were reported and discussed separately (Argonne 2009a). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program to address both of the continuing monitoring objectives until a CAS for Centralia is developed (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve previously established (before the pilot test) monitoring points (locations identified in Figure 1.3) and the five outlying pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.4); and (2) Sampling twice yearly at the five pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.4). With the approval of the KDHE (2009), groundwater sampling for analyses of VOCs and selected other geochemical parameters was conducted at Centralia under the interim monitoring program outlined above in April and October 2009. This report documents the findings of the 2009 monitoring events.« less
78 FR 75353 - Agency Information Collection Activities: Proposed Collection: Public Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
... cognitive interviews, focus groups, usability tests, field tests/pilot interviews, and experimental research... as more basic research on response errors in surveys. HRSA staff use various techniques to evaluate... interview structure consists of respondents first answering a draft survey question and then providing...
Jalalian, Mehrdad; Latiff, Latiffah; Hassan, Syed Tajuddin Syed; Hanachi, Parichehr; Othman, Mohamed
2010-05-01
University students are a target group for blood donor programs. To develop a blood donation culture among university students, it is important to identify factors used to predict their intent to donate blood. This study attempted to develop a valid and reliable measurement tool to be employed in assessing variables in a blood donation behavior model based on the Theory of Planned Behavior (TPB), a commonly used theoretical foundation for social psychology studies. We employed an elicitation study, in which we determined the commonly held behavioral and normative beliefs about blood donation. We used the results of the elicitation study and a standard format for creating questionnaire items for all constructs of the TPB model to prepare the first draft of the measurement tool. After piloting the questionnaire, we prepared the final draft of the questionnaire to be used in our main study. Examination of internal consistency using Chronbach's alpha coefficient and item-total statistics indicated the constructs "Intention" and "Self efficacy" had the highest reliability. Removing one item from each of the constructs, "Attitude," "Subjective norm," "Self efficacy," or "Behavioral beliefs", can considerably increase the reliability of the measurement tool, however, such action is controversial, especially for the variables "attitude" and "subjective norm." We consider all the items of our first draft questionnaire in our main study to make it a reliable measurement tool.
ERIC Educational Resources Information Center
Ontario Ministry of Community and Social Services, Toronto.
This document reports on 13 pilot projects of the Flexible Services Development Project (FSDP), which was initiated in Ontario, Canada, in 1988 to improve child care services for rural families, families with unusual work schedules, families facing short-term emergencies, and families with children who have short-term illnesses. The data and…
Interim Report on the Truancy Court Diversion Program in the District of Columbia, 2011-12
ERIC Educational Resources Information Center
Cahill, Meagan; Liberman, Akiva; Cramer, Lindsey
2012-01-01
The Truancy Court Diversion Program (TCDP) is a voluntary program for at risk students and their parents. It combines involvement of a Family Court judge in group and individual sessions with service provision. During the 2011-12 school year, a pilot TCDP was implemented at Kramer Middle School (M.S.) and at Johnson M.S. The program attempts to…
Developing a concept for a national used fuel interim storage facility in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Donald Wayne
2013-07-01
In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a 'Monitored Retrievable Storage' facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to buildmore » a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE's goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility. (authors)« less
ERIC Educational Resources Information Center
New York State Interdepartmental Fuel and Energy Committee, Albany.
After presenting the background of the availability of fuel for transportation and the increasing per capita energy consumption, the report examines the State's role in energy conservation. Five proposals are outlined: (1) a coordinated education program designed to increase public awareness of the current energy situation; (2) a pilot program of…
Pilot retrofit test of refrigerant R-134a for GDSCC
NASA Technical Reports Server (NTRS)
Albus, J.; Brown, B.; Dungao, M.; Spencer, G.
1994-01-01
NASA has issued an interim policy requiring all of its Centers to eliminate consumption (purchase) of stratospheric ozone-depleting substances, including chlorofluorocarbons (CFC's), by 1995. Also, plans must be outlined for the eventual phase out of their usage. The greatest source of CFC consumption and usage at the Goldstone Deep Space Communications Complex is refrigerant R-12, which is used in many of the facility's air-conditioning systems. A pilot retrofit test shows that retrofitting R-12 air-conditioning systems with hydrofluorocarbon R-13a would be a workable means to comply with the R-12 portion of NASA's policy. Results indicate acceptable cost levels and nearly equivalent system performance.
An Emerging Technology Curriculum. Education for Technology Employment Project. Final Report.
ERIC Educational Resources Information Center
Harms, Dan; And Others
Individualized, competency-based curriculum materials were developed for a course on Principles of Technology, Units 1-6. New and updated curriculum materials in Drafting and Electronics and the Principles of Technology units were pilot tested in area vocational center settings in Illinois. A computer maintenance program was also developed but not…
Development of Measures of Organizational Leadership for Health Promotion
ERIC Educational Resources Information Center
Barrett, Linda; Plotnikoff, Ronald C.; Raine, Kim; Anderson, Donna
2005-01-01
This study describes the development and psychometric evaluation of four scales measuring leadership for health promotion at an organizational level in the baseline survey (n = 144) of the Alberta Heart Health Project. Content validity was established through a series of focus groups and expert opinion appraisals, pilot testing of a draft based on…
World of Work. First Year Report, 1971-1972.
ERIC Educational Resources Information Center
Mount Pleasant Public Schools, MI.
Prepared during the first year of a 3-year pilot program, this working draft of a resource guide represents efforts to develop and field test resource units for career education, Grades 1-6. The units, which include objectives and learning activities, are clustered as follows: (1) Distribution and Marketing, (2) Agriculture-Natural Resources, (3)…
Draft Model Curriculum in Nursing Education for Alcohol and Other Drug Abuse.
ERIC Educational Resources Information Center
Naegle, Madeline A.; Burns, Elizabeth M.
This document contains three model curricula in nursing education for alcohol and other drug abuse, one graduate and one baccalaureate level from New York University's (NYU) Division of Nursing, and the third combining graduate and undergraduate level curricula for Ohio State University (OSU). The NYU undergraduate curriculum contains a pilot test…
76 FR 18750 - Ocean Renewable Power Company, LLC; Notice of Change in Docket Number
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-05
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12680-003; Project No. 12711-003] Ocean Renewable Power Company, LLC; Notice of Change in Docket Number On July 24, 2009, Ocean Renewable Power Company, LLC (ORPC) filed a draft hydrokinetic pilot license application (DLA) for the...
1983-11-05
PILOT OF HIS INJURY AND PILOT RETURNED TO BASE RIO SUSTAINED MINIMAL ( WHIPLASH ) INJURY CAUSE WEIGHT OF HELMET AND MASK ON RiO’S HEAD WHILE IN...John Vetter (ESA-31 Division Head ). As has most unfortunately, despite the best of intentions of the team members to, for once, present the drafts...WARMINSTER NAVAIRTESTCEN (SY-70) PAXRIV NAVWPNCEN (64) CHINA LAKE NAVORDSTA (51) INDIAN HEAD NAVSAFECEN NORFOLK AFISC/SEL NORTON AFB,CA PACMISTESTCEN 1131 U.S
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
... decision-making. Establish a vision, mission, goals, and objectives for transportation planning in the... as a pilot project for the implementation of a region-level transportation planning process within... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-R-2012-N270; FXRS85550300000-XXX...
Professional Development Framework for e-Learning: A Guide for Advisers and Practitioners
ERIC Educational Resources Information Center
Smith, Ros
2007-01-01
In January 2006 the Learning and Skills Development Agency (LSDA) launched its draft publication, "A Professional Development Framework for e-Learning" (ePD) for consultation with the post-16 education and training sector. In March 2006 the Learning and Skills Council funded the Learning and Skills Network (LSN) to run a pilot to…
ERIC Educational Resources Information Center
Rodriguez, Felix; Colon, Elsie M.
The Industry-Academia Partnership Pilot Project (IAPPP) was undertaken by Huertas Junior College (HJC), in Caguas, Puerto Rico, to improve advanced technical education, enhance the competitive capabilities of the region, and reduce the region's unemployment rate. The project consisted of three basic components: professional growth opportunities…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruno, M.J.
1980-10-01
Beneficiation of bauxite by high intensity wet magnetic separation to remove Fe and Ti was not successful. Pilot reactor VSR-3 was modified and operated to evaluate the blast-arc reduction process concept. Modifications included a tapered upper shaft section, vertical stroke ram, and CO preheater system. The taper/ram revisions were successful in maintaining bed movement, resulting in several continuous runs in which large quantities of burden were fed and metal product was recovered. Pilot VSR samples were also analyzed. The major phases contained Si and FeSi/sub 2/Al/sub 4/ intermetallics in a matrix of eutectic Al-Si.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruno, M.J.
1980-10-01
Pilot reactor VSR-3 operation in the third quarter was directed to tapping molten alloy product. Modifications to the hearth region included a tapping furnace to maintain taphole temperature, a graphite ring filter to separate carbides from matal and an alumina liner to eliminate carbiding from reaction of alloy with the graphite hearth walls. Tapping was not successful, however, due to high alloy viscosity from a large concentration of carbides. Three runs were made on the pilot crystallizer to determine the effects of alloy composition, cooling rate, tamping rate, remelt temperature and rate on eutectic Al-Si yield.
Defense Contracting. Interim Report on Mentor-Protege Program for Small Disadvantaged Firms
1992-03-01
concern about the low participation of small disadvantaged businesses1 (SDBS) within DOD’s procurement system Accesion For resulted in section 1207 of...public ieloase and sale: its distribution is unlimited. A-1 ’To qualify as a small disadvantaged business, a company must not exceed the Small Business...economically disadvantaged individuals. S Page 1 GAOINSIAD-92-135 DOD’s Mentor-Protege Pilot Program B-247530 assist SDBs (proteges) in enhancing their
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham
The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, andmore » Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.« less
NASA Technical Reports Server (NTRS)
Tolefson, H. B.
1946-01-01
Summaries of the gust and draft velocities evaluated from acceleration and airspeed-altitude records taken by NACA instruments installed n P-61c airplanes participating in thunderstorm flights 12 and 13 of July 19, 1946, and July 20, 1946, respectively, are presented in tables I and II herein. These data are of the type presented in reference 1 for previous flights. Inspection of the motion picture records of the pilots' instrument panels for the present flights indicated that the milliameter connected to equipment for measuring ambient air temperature read zero throughout all traverses.
76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-09
...On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (``National Ocean Policy''). The National Ocean Policy provides an implementation strategy, which describes nine priority objectives that seek to address some of the most pressing challenges facing the ocean, our coasts, and the Great Lakes. The National Ocean Council is responsible for developing strategic action plans for each of the nine priority objectives. As a first step, Federal interagency writing teams have developed content outlines for each draft strategic action plan. The NOC is seeking public review and comment of these content outlines. The purpose of the draft content outlines (outlines) is to provide the public with an initial view of potential actions that could be taken to further the national priority objectives. As such, they are an interim step toward development of the first full draft of each strategic action plan. In developing the outlines, the writing teams were informed by the comments received during an initial public scoping period that closed on April 29. Each outline presents in bulleted form potential actions to further the particular priority objective. It describes the reasons for taking the action, expected outcomes and milestones, gaps and needs in science and technology, and the timeframe for completing the action. The outlines also provide an overview of the priority objective, greater context for the strategic action plan in implementing the National Ocean Policy, and an overview of the preparation of the plan . Public comments received on the outlines will be collated and posted on the NOC Web site. The comments on the outlines will inform the preparation of full draft strategic action plans, which will be released for public review in the fall of 2011, allowing additional opportunity for the public to provide comments. Final strategic action plans are expected to be completed by early 2012.
Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, S.M.; Sands, M.D.; Donat, J.R.
This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed actionmore » will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)« less
Ganeshan, B; Miles, K A; Babikir, S; Shortman, R; Afaq, A; Ardeshna, K M; Groves, A M; Kayani, I
2017-03-01
The purpose of this study was to investigate the ability of computed tomography texture analysis (CTTA) to provide additional prognostic information in patients with Hodgkin's lymphoma (HL) and high-grade non-Hodgkin's lymphoma (NHL). This retrospective, pilot-study approved by the IRB comprised 45 lymphoma patients undergoing routine 18F-FDG-PET-CT. Progression-free survival (PFS) was determined from clinical follow-up (mean-duration: 40 months; range: 10-62 months). Non-contrast-enhanced low-dose CT images were submitted to CTTA comprising image filtration to highlight features of different sizes followed by histogram-analysis using kurtosis. Prognostic value of CTTA was compared to PET FDG-uptake value, tumour-stage, tumour-bulk, lymphoma-type, treatment-regime, and interim FDG-PET (iPET) status using Kaplan-Meier analysis. Cox regression analysis determined the independence of significantly prognostic imaging and clinical features. A total of 27 patients had aggressive NHL and 18 had HL. Mean PFS was 48.5 months. There was no significant difference in pre-treatment CTTA between the lymphoma sub-types. Kaplan-Meier analysis found pre-treatment CTTA (medium feature scale, p=0.010) and iPET status (p<0.001) to be significant predictors of PFS. Cox analysis revealed that an interaction between pre-treatment CTTA and iPET status was the only independent predictor of PFS (HR: 25.5, 95% CI: 5.4-120, p<0.001). Specifically, pre-treatment CTTA risk stratified patients with negative iPET. CTTA can potentially provide prognostic information complementary to iPET for patients with HL and aggressive NHL. • CT texture-analysis (CTTA) provides prognostic information complementary to interim FDG-PET in Lymphoma. • Pre-treatment CTTA and interim PET status were significant predictors of progression-free survival. • Patients with negative interim PET could be further stratified by pre-treatment CTTA. • Provide precision surveillance where additional imaging reserved for patients at greatest recurrence-risk. • Assists in risk-adapted treatment strategy based on interim PET and CTTA.
2011-02-01
that can be taken to mitigate this problem. A review of existing regulations applicable to multiple government agencies will be conducted. This...of civil liberties, but by virtue of the fact the FAA controls when and where RPA can fly, their regulations have an impact on the protection or...Administration, Interim Operational Approval Guidance 08-01. Unmanned Aircraft Systems Operations in the U . S. National Airspace System, 13 March 2008, 5
Gade, Anne Lill; Ovrebø, Steinar; Hylland, Ketil
2008-07-01
The goal of REACH is the safe use of chemicals. This study examines the efficiency and usefulness of two draft technical guidance notes in the REACH Interim Project 3.2-2 for the development of the chemical safety report and exposure scenarios. A case study was carried out for a paint system for protection of structural steel. The focuses of the study were risk assessment of preparations based on Derived No Effect Level (DNEL) and Predicted No Effect Concentrations (PNEC) and on effective and accurate communication in the supply chain. Exposure scenarios and generic descriptions of uses, risk management measures, and exposure determinants were developed. The study showed that communication formats, software tools, and guidelines for chemical risk assessment need further adjustment to preparations and real-life situations. Web platforms may simplify such communication. The downstream formulator needs basic substance data from the substance manufacturer during the pre-registration phase to develop exposure scenarios for preparations. Default values need to be communicated in the supply chain because these were critical for the derivation of applicable risk management demands. The current guidelines which rely on the available toxicological knowledge are insufficient to advise downstream users on how to develop exposure scenarios for preparations.
NAVY ERP: An Analysis of Change Management
2013-09-01
of ‘best practice’ in information systems for operations management . European Journal of Information Systems, 8, 284–293. Veit, B. (2008). Draft... Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction...the Navy could accomplish. Bogdanowicz (2004) notes that the pilots proved ERP can be used to: Operate and manage major acquisition commands and
ERIC Educational Resources Information Center
Turlington, Anita; And Others
These instructional materials include six supplementary units for Tech Prep English I (grade 9) and six assignments for Tech Prep English II (grade 10). The Tech Prep English I units have these components: unit objectives, introduction, and follow-up exercises. Topics include goal setting, problem solving and decision making, listening and reading…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saueressig, Daniel G.
2013-07-01
In 1965 and 1966, approximately 303 m{sup 3} of Number 2 diesel fuel leaked from a pipeline used to support reactor operations at the Hanford Site's N Reactor. N Reactor was Hanford's longest operating reactor and served as the world's first dual purpose reactor for military and power production needs. The Interim Action Record of Decision for the 100-N Area identified in situ bioremediation as the preferred alternative to remediate the deep vadose zone contaminated by this release. A pilot project supplied oxygen into the vadose zone to stimulate microbial activity in the soil. The project monitored respiration rates asmore » an indicator of active biodegradation. Based on pilot study results, a full-scale system is being constructed and installed to remediate the vadose zone contamination. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eide, J.; Baillieul, T. A.; Biedscheid, J.
2003-02-26
Battelle Columbus Laboratories (BCL), located in Columbus, Ohio, must complete decontamination and decommissioning (D&D) activities for nuclear research buildings and grounds by 2006, as directed by Congress. Most of the resulting waste (approximately 27 cubic meters [m3]) is remote-handled (RH) transuranic (TRU) waste destined for disposal at the Waste Isolation Pilot Plant (WIPP). The BCL, under a contract to the U.S. Department of Energy (DOE) Ohio Field Office, has initiated a plan to ship the TRU waste to the DOE Hanford Nuclear Facility (Hanford) for interim storage pending the authorization of WIPP for the permanent disposal of RH-TRU waste. Themore » first of the BCL RH-TRU waste shipments was successfully completed on December 18, 2002. This BCL shipment of one fully loaded 10-160B Cask was the first shipment of RH-TRU waste in several years. Its successful completion required a complex effort entailing coordination between different contractors and federal agencies to establish necessary supporting agreements. This paper discusses the agreements and funding mechanisms used in support of the BCL shipments of TRU waste to Hanford for interim storage. In addition, this paper presents a summary of the efforts completed to demonstrate the effectiveness of the 10-160B Cask system. Lessons learned during this process are discussed and may be applicable to other TRU waste site shipment plans.« less
NASA Technical Reports Server (NTRS)
Tolefson, H. B.
1946-01-01
The gust and draft velocities evaluated from acceleration and airspeed-altitude records taken by NACA instruments installed in P-61c airplanes participating in thunderstorm flights 9, 10, and 11 of July 12, 1946, July 17, 1946, and July 18, 1946, respectively, are presented in references 1 and 2 for previous flights. In accordance with a recent discussion with a member of the U.S. Weather Bureau staff, motion-picture records of the pilots' instrument panels for the present flights were inspected to note variations in the readings of a milliammeter used in conjunction with other equipment to indicate ambient air temperature. The inspection indicated that the instrument read zero throughout all traverses.
Handling qualities criteria for the space shuttle orbiter during the terminal phase of flight
NASA Technical Reports Server (NTRS)
Stapleford, R. L.; Klein, R. H.; Hob, R. H.
1972-01-01
It was found that large portions of the military handling qualities specification are directly applicable. However a number of additional and substitute criteria are recommended for areas not covered or inadequately covered in the military specification. Supporting pilot/vehicle analyses and simulation experiments were conducted and are described. Results are also presented of analytical and simulator evaluations of three specific interim Orbiter designs which provided a test of the proposed handling qualities criteria. The correlations between the analytical and experimental evaluations were generally excellent.
1992-08-01
instruments and the exterior environment with frequent shifts from one to the other. The design for future helmets should include the capability to switch...where and after how long? (20) I.A. 18 Did you experience any helmet temperature build-up? If YES, after how long? (21) I.A. 19 BATERY PACK (26) I.A. 19.a...three I-NIGHTS helmet mdels in the special .operations environment . 2. Critical Operational Issues for this 017T&H were: a. Do any of the I-NIGHTS
1987-09-01
inverse transform method to obtain unit-mean exponential random variables, where Vi is the jth random number in the sequence of a stream of uniform random...numbers. The inverse transform method is discussed in the simulation textbooks listed in the reference section of this thesis. X(b,c,d) = - P(b,c,d...Defender ,C * P(b,c,d) We again use the inverse transform method to obtain the conditions for an interim event to occur and to induce the change in
Failing ethics 101: psychologists, the U.S. military establishment, and human rights.
Boyd, J Wesley; LoCicero, Alice; Malowney, Monica; Aldis, Rajendra; Marlin, Robert P
2014-01-01
The American Psychological Association (APA) has long maintained a close, even symbiotic, relationship with the Department of Defense (DOD) and the Veterans Administration (VA). Herein we highlight these close ties and describe psychologists' participation in interrogations by U.S. military and intelligence entities. We then review the APA's statements about the permissibility of psychologist participation in the interrogation and torture of suspected terrorists. These issues are significant in and of themselves and because the VA and DOD have been described as "growth careers" for psychologists of the future (1). Additionally, the Health Care Personnel Delivery System allows the drafting of civilian clinical psychologists into military service even in the absence of a general draft. In light of psychologists' extensive involvement in the interrogation process of suspected terrorists, and the possibility that psychologists without prior military experience may be drafted, we wondered how much psychologists have been taught about their ethical duties should they find themselves in military settings. The results of our pilot study of U.S. psychology graduate students, which assessed their knowledge of military ethics, raise concerns that psychologists receive inadequate formal training in these matters. This may leave psychologists vulnerable to misinformation about proper ethical conduct in their future work.
Yoshikawa, Toru; Kawakami, Norito; Kogi, Kazutaka; Tsutsumi, Akizumi; Shimazu, Miyuki; Nagami, Makiko; Shimazu, Akihito
2007-07-01
An action checklist for improving the workplace environment by means of enhancing mental health of workers (Mental Health Action Check List: MHACL) was developed. The use of the checklist for primary prevention was examined. MHACL was developed through three steps: (1) Review of related references and collection of improvement examples for designing a draft MHACL; (2) pilot application of the draft at industrial workplaces and trials at workshops of occupational health staff; and (3) proposing a new MHACL for general use in industry. Workplace improvement actions related to mental health were listed in eight technical areas. From 84 workplaces in Japan, 201 such actions were collected. Typical improvement action phrases were extracted based on these examples, and a draft MHACL containing 40 generally applicable actions were prepared. This draft was applied to selected workplaces for its use as a tool for group discussion. Then, the utility of the checklist was discussed by 105 occupational health staff working in public service offices. The workshop suggested modifications of the draft MHACL including improved check items and usage procedures and the need to use easy-to-understand actions. The final version of the MHACL comprised 30 items in six technical areas: A) sharing work planning, B) work time and organization, C) ergonomic work methods, D) workplace environment, E) mutual support in the workplace, and F) preparedness and care. A new action checklist was proposed for use as a means of changing existing workplace environments and proposing practical actions for improving it. The checklist was confirmed to be useful for organizing workplace-level discussion for identifying immediate improvements at the workplace. The checklist is expected to be widely applied for promoting primary prevention measures in terms of better mental health.
The small-scale treatability study sample exemption
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coalgate, J.
1991-01-01
In 1981, the Environmental Protection Agency (EPA) issued an interim final rule that conditionally exempted waste samples collected solely for the purpose of monitoring or testing to determine their characteristics or composition'' from RCRA Subtitle C hazardous waste regulations. This exemption (40 CFR 261.4(d)) apples to the transportation of samples between the generator and testing laboratory, temporary storage of samples at the laboratory prior to and following testing, and storage at a laboratory for specific purposes such as an enforcement action. However, the exclusion did not include large-scale samples used in treatability studies or other testing at pilot plants ormore » other experimental facilities. As a result of comments received by the EPA subsequent to the issuance of the interim final rule, the EPA reopened the comment period on the interim final rule on September 18, 1987, and specifically requested comments on whether or not the sample exclusion should be expanded to include waste samples used in small-scale treatability studies. Almost all responders commented favorably on such a proposal. As a result, the EPA issued a final rule (53 FR 27290, July 19, 1988) conditionally exempting waste samples used in small-scale treatability studies from full regulation under Subtitle C of RCRA. The question of whether or not to extend the exclusion to larger scale as proposed by the Hazardous Waste Treatment Council was deferred until a later date. This information Brief summarizes the requirements of the small-scale treatability exemption.« less
History society launches journal
NASA Astrophysics Data System (ADS)
Richman, Barbara T.
A fledgling international organization plans to launch, in the next few months, a journal devoted to the study of the history of the earth sciences. The journal, to be published by the History of Earth Sciences Society (HESS), will be edited by Gerald M. Friedman ot the Rensselaer Polytechnic Institute.HESS will promote interest and scholarship in the history of the earth sciences by publishing the semiannual journal, by organizing meetings about the history of earth sciences, and by supporting the efforts of other associations displaying similar interests, according to the society's draft constitution. An organizational meeting to ratify the constitution and to elect officers will be held in conjunction with the annual meeting of the Geological Society of America in October. The interim officers and the proposed slate for 1983 include David B. Kitts (University of Oklahoma, Norman), president; Albert V. Carrozi (University of Illinois, Urbana), president-elect; and Ellis L. Yochelson (U.S. Geological Survey, National Museum of Natural History), secretary.
NASA Astrophysics Data System (ADS)
1980-11-01
The Magma Cooling Tower (MCT) process utilizes a falling film heat exchanger integrated into an induced draft cooling tower to evaporate waste water. A hot water source such as return cooling water provides the energy for evaporation. Water quality control is maintained by removing potential scaling constituents to make concentrations of the waste water possible without scaling heat transfer surfaces. A pilot-scale demonstration test of the MCT process was performed from March 1979 through June 1979 at Nevada Power Company's Sunrise Station in Las Vegas, Nevada. The pilot unit extracted heat from the powerplant cooling system to evaporate cooling tower blowdown. Two water quality control methods were employed: makeup/sidestream softening and fluidized bed crystallization. The 11 week softening mode test was successful.
National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacGowan, B
Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-08-01
Volume IV contains the following attachments for Module IV: VOC monitoring plan for bin-room tests (Appendix D12); bin emission control and VOC monitoring system drawings; bin scale test room ventilation drawings; WIPP supplementary roof support system, underground storage area, room 1, panel 1, DOE/WIPP 91-057; and WIPP supplementary roof support system, room 1, panel 1, geotechnical field data analysis bi-annual report, DOE/WIPP 92-024.
Counterair Operations in the Light Infantry Division.
1985-12-02
fiO -RI67 6S1 COUNTERAIR OPERATIONS IN THE LIGHT INFANTRY DIVISION In1 (U) ARMY COMMAND AND GENERAL STAFF COLL FORT LERVENHORTH KS SCHOOL OF ADVANCED...concealment will disrupt the enemy pilot’s decision cycle causing him to fail in his mission. The Finns used deception in the Russo -Finnish War, 1939...OiDerations (Draft) (Fort Leavenworth, KS: US Army Command and General Staff College, July 1985), p. 3-58. 67 FM 44-1, p. 4-4. SRCharles A. Robinson, " Russo
2016-11-02
This final rule implements section 702 (c) of the Carl Levin and Howard P. "Buck" McKeon National Defense Authorization Act for Fiscal Year 2015 which states that beginning October 1, 2015, the pharmacy benefits program shall require eligible covered beneficiaries generally to refill non-generic prescription maintenance medications through military treatment facility pharmacies or the national mail-order pharmacy program. An interim final rule is in effect. Section 702(c) of the National Defense Authorization Act for Fiscal Year 2015 also terminates the TRICARE For Life Pilot Program on September 30, 2015. The TRICARE For Life Pilot Program described in section 716(f) of the National Defense Authorization Act for Fiscal Year 2013, was a pilot program which began in March 2014 requiring TRICARE For Life beneficiaries to refill non-generic prescription maintenance medications through military treatment facility pharmacies or the national mail-order pharmacy program. TRICARE for Life beneficiaries are those enrolled in the Medicare wraparound coverage option of the TRICARE program. This rule includes procedures to assist beneficiaries in transferring covered prescriptions to the mail order pharmacy program.
Halm, Margo A; Baker, Clarice; Harshe, Val
2014-12-01
This pilot study compared the effects of an essential oil mixture versus standard care on skin reactions in breast cancer patients receiving radiation. Using an experimental design, 24 patients were randomized to standard care (i.e., RadiaPlexRx™ ointment) or an essential oil mixture. Products were applied topically three times a day until 1 month postradiation. Weekly skin assessments were recorded and women completed patient satisfaction and quality of life (QOL) instruments at 3-, 6-, and 10-week intervals. No significant differences were found for skin, QOL, or patient satisfaction at interim or follow-up time points. Effect sizes were as follows: skin = .01 to .07 (small-medium effect); QOL = .01 to .04 (small effect); patient satisfaction = .02 (small effect). The essential oil mixture did not provide a better skin protectant effect than standard care. These findings suggest the essential oil mixture is equivalent to RadiaPlexRx, a common product used as standard care since it has been shown to be effective in protecting skin from radiation. Thus, this pilot provides evidence to support botanical or nonpharmaceutical options for women during radiotherapy for breast cancer. © The Author(s) 2014.
Morgan, Sarah L; Palagi, Patricia M; Fernandes, Pedro L; Koperlainen, Eija; Dimec, Jure; Marek, Diana; Larcombe, Lee; Rustici, Gabriella; Attwood, Teresa K; Via, Allegra
2017-01-01
One of the main goals of the ELIXIR-EXCELERATE project from the European Union's Horizon 2020 programme is to support a pan-European training programme to increase bioinformatics capacity and competency across ELIXIR Nodes. To this end, a Train-the-Trainer (TtT) programme has been developed by the TtT subtask of EXCELERATE's Training Platform, to try to expose bioinformatics instructors to aspects of pedagogy and evidence-based learning principles, to help them better design, develop and deliver high-quality training in future. As a first step towards such a programme, an ELIXIR-EXCELERATE TtT (EE-TtT) pilot was developed, drawing on existing 'instructor training' models, using input both from experienced instructors and from experts in bioinformatics, the cognitive sciences and educational psychology. This manuscript describes the process of defining the pilot programme, illustrates its goals, structure and contents, and discusses its outcomes. From Jan 2016 to Jan 2017, we carried out seven pilot EE-TtT courses (training more than sixty new instructors), collaboratively drafted the training materials, and started establishing a network of trainers and instructors within the ELIXIR community. The EE-TtT pilot represents an essential step towards the development of a sustainable and scalable ELIXIR TtT programme. Indeed, the lessons learned from the pilot, the experience gained, the materials developed, and the analysis of the feedback collected throughout the seven pilot courses have both positioned us to consolidate the programme in the coming years, and contributed to the development of an enthusiastic and expanding ELIXIR community of instructors and trainers.
Morgan, Sarah L; Koperlainen, Eija; Dimec, Jure; Marek, Diana; Larcombe, Lee; Rustici, Gabriella; Attwood, Teresa K; Via, Allegra
2017-01-01
One of the main goals of the ELIXIR-EXCELERATE project from the European Union’s Horizon 2020 programme is to support a pan-European training programme to increase bioinformatics capacity and competency across ELIXIR Nodes. To this end, a Train-the-Trainer (TtT) programme has been developed by the TtT subtask of EXCELERATE’s Training Platform, to try to expose bioinformatics instructors to aspects of pedagogy and evidence-based learning principles, to help them better design, develop and deliver high-quality training in future. As a first step towards such a programme, an ELIXIR-EXCELERATE TtT (EE-TtT) pilot was developed, drawing on existing ‘instructor training’ models, using input both from experienced instructors and from experts in bioinformatics, the cognitive sciences and educational psychology. This manuscript describes the process of defining the pilot programme, illustrates its goals, structure and contents, and discusses its outcomes. From Jan 2016 to Jan 2017, we carried out seven pilot EE-TtT courses (training more than sixty new instructors), collaboratively drafted the training materials, and started establishing a network of trainers and instructors within the ELIXIR community. The EE-TtT pilot represents an essential step towards the development of a sustainable and scalable ELIXIR TtT programme. Indeed, the lessons learned from the pilot, the experience gained, the materials developed, and the analysis of the feedback collected throughout the seven pilot courses have both positioned us to consolidate the programme in the coming years, and contributed to the development of an enthusiastic and expanding ELIXIR community of instructors and trainers. PMID:28928938
Distribution of the two-sample t-test statistic following blinded sample size re-estimation.
Lu, Kaifeng
2016-05-01
We consider the blinded sample size re-estimation based on the simple one-sample variance estimator at an interim analysis. We characterize the exact distribution of the standard two-sample t-test statistic at the final analysis. We describe a simulation algorithm for the evaluation of the probability of rejecting the null hypothesis at given treatment effect. We compare the blinded sample size re-estimation method with two unblinded methods with respect to the empirical type I error, the empirical power, and the empirical distribution of the standard deviation estimator and final sample size. We characterize the type I error inflation across the range of standardized non-inferiority margin for non-inferiority trials, and derive the adjusted significance level to ensure type I error control for given sample size of the internal pilot study. We show that the adjusted significance level increases as the sample size of the internal pilot study increases. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.
Tian, J H; Di, P; Lin, Y; Zhang, Y; Wei, D H; Cui, H Y
2017-01-09
Objective: To evaluate the primary clinical outcomes of immediate provisionalization with a monolithic crown utilizing a novel chairside computer aided design and computer aided manufacture (CAD/CAM) workflow for single tooth immediate implant placement. Methods: This pilot study was a prospective within-subjects design. Thirteen consecutive patients were included and diagnosed with untreatable single incisor or premolar with fine general and local anatomical conditions. The trial was conducted at Department of Implantology, Peking University School and Hospital of Stomatology, Beijing, between January 2016 and June 2016. The teeth were extracted atraumatically and implants were immediately placed in the fresh sockets. Two screw-retained interim crowns were fabricated for the same site utilizing different workflows, a monolithic lithium disilicate (LS2) crown produced by CEREC (Sirona, Germany) chairside CAD/CAM system (CER group) and a manually fabricated resin crown utilizing conventional workflow (CONV group) respectively. The patients were blinded to the group allocation of the two interim crowns. After the clinical try-in for both crowns in a randomized sequence, the patients ' level of satisfaction was assessed with a virtual analogue scale (VAS) questionnaire. The restorations chosen by patients themselves were seated in the implants by one experienced prosthodontist. The accuracy, aesthetic effect and clinical time consumption of both groups were compared. Statistical analyses were performed with the Wilcoxon signed rank test. Results: All patients were treated with atraumatic tooth extraction, immediate implant placement using flapless surgery and immediate provisionalization in a single visit. The interim crowns of both groups could be fitted with or without slight adjustments. For each patient, the interim crown of CER group was chosen to be seated with a relatively higher VAS result. The white esthetic score (WES) results demonstrated no statistically significant difference between CER group (7.5±1.1) and CONV group (7.9±0.9) ( P> 0.05). The mean total work time was significantly different resulting in (131.9±5.0) min for CER group and (205.2±6.3) min( P< 0.05). The major difference lied in the laboratory work time, resulting in (113.5±6.3) min for CER group which was significantly shorter than (185.6±6.6) min for CONV group. As for impression taking time, the CER group (7.5±0.8) min was significantly shorter than CONV group (11.7± 1.1) min ( P< 0.05). However, analysis for clinical adjustment time showed a significantly longer time for CER group [(11.0±2.1) min vs (8.0±2.8) min, P< 0.05]. After 3-6 months of observation, the overall survival rate was 100%. Screw loosening occurred in 4 patients and was tightened again. No other major complication soccurred. Conclusions: The full digital workflow utilizing CEREC chairside CAD/CAM system to fabricate interim crowns after immediate implant placement in one single visit was feasible. It was more time-efficient and could effectively shorten the laboratory work time compared to the conventional workflow. Patients demonstrated high satisfaction and there was no statistical difference in WES results compared to the conventional workflow. Favorable clinical outcomes were gained in this short-term follow-up study.
Legal Background of Aviation Medicine in Europe and its future development
Siedenburg, J
2008-01-01
European aviation is moving into an exciting phase now, the administrative structure is changing. Aviation rules and aviation medicine will get a new structure as well. The nature of air traffic required an international scope in rulemaking – especially in such a confined continent as Europe with 41 countries, about 380 Million inhabitants and 317 billion person kilometres flown each year. For economic reasons it became necessary to develop common standards for certification of aircraft in the beginning of the 1970ies, maintenance followed later on. The Cyprus arrangement of 01 July 1990 created the JAA (Joint Aviation Authorities). Joint Aviation Requirements were drafted to replace existing national provisions and have been implemented from the end of the 1990ies. The areas of air operations and pilot licensing have been covered as well. The latter comprises of aviation medicine as well. The implementation of JAR-FCL 3, which covers the medical requirements for pilots, started from 1999 on in the several JAA member states. A detailed overview about development and structure of JAA, tools for harmonisation, rulemaking and amendment of requirements, medical standards, review procedures for contentious or marginal cases is described. Shortcomings were the fact that implementation was left to the discretion of the member states and that JAA had no executive power. This resulted in differences in safety and the EU commission concluded that aviation safety had to be regulated by the EU commission. After adoption of EU regulation 1592/2002 in 2002 common and binding requirements were to be drafted and a European aviation agency to be founded. EASA (European Aviation Safety Agency) started its work in September 2003. Finally it will take over the role of JAA completely. Whereas Certification and Maintenance were in the focus first, Flight Operations and Licensing are going to be covered as well in the near future. Essential Requirements have been drafted, outlining – inter alia – the scope of Licensing and of aeromedical aspects. However, the legislative process will most probably last at least until the end of 2007. Implementing Rules - being based on existing JAR-FCLs will be drafted soon and are going to be implemented as soon as EASA is operative for Licensing. JAR-FCL 3 will be the basis for the Implementing Rules concerning aeromedical fitness. An overview about the structure of the Agency, rulemaking procedures, philosophy of medical provisions and the transition from JAA to EASA is described. PMID:19048095
A Pilot Study of Community-Friendly Manual Guided Drug Counseling
Crits-Christoph, Paul; Gibbons, Mary Beth Connolly; Ring-Kurtz, Sarah; Gallop, Robert; Present, Julie
2009-01-01
To facilitate effectiveness testing and dissemination of treatments to community based setting, therapist training manuals that are more “community friendly” are needed. The aim of the current project was to create revised versions of individual drug counseling (IDC) and group drug counseling (GDC) treatment manuals for cocaine dependence and to conduct a preliminary study of their effectiveness. After changing the format and context of existing drug counseling manuals to have greater ease of use in the community, draft manuals were given to 23 community-based counselors for their feedback. Final versions were then used in a pilot randomized clinical trial involving 41 cocaine dependent patients who received 3 months of either IDC + GDC or GDC alone treatment. Counselors implemented the new treatment manuals with acceptable levels of adherence and competence. Outcome results indicated that substantial change in drug use was evident, but the amount of abstinence obtained was limited. PMID:19038525
A pilot study of community-friendly manual-guided drug counseling.
Crits-Christoph, Paul; Gibbons, Mary Beth Connolly; Ring-Kurtz, Sarah; Gallop, Robert; Present, Julie
2009-07-01
Therapist training manuals that are more "community friendly" are needed to facilitate effectiveness testing and dissemination of treatments to community based setting. The aim of the current project was to create revised versions of individual drug counseling (IDC) and group drug counseling (GDC) treatment manuals for cocaine dependence and to conduct a preliminary study of their effectiveness. After changing the format and context of existing drug counseling manuals to have greater ease of use in the community, draft manuals were given to 23 community-based counselors for their feedback. Final versions were then used in a pilot randomized clinical trial involving 41 cocaine-dependent patients who received 3 months of either IDC + GDC or GDC-alone treatment. Counselors implemented the new treatment manuals with acceptable levels of adherence and competence. Outcome results indicated that substantial change in drug use was evident, but the amount of abstinence obtained was limited.
Adaptive clinical trial design.
Chow, Shein-Chung
2014-01-01
In recent years, the use of adaptive design methods in clinical trials based on accumulated data at interim has received much attention because of its flexibility and efficiency in pharmaceutical/clinical development. In practice, adaptive design may provide the investigators a second chance to modify or redesign the trial while the study is still ongoing. However, it is a concern that a shift in target patient population may occur after significant adaptations are made. In addition, the overall type I error rate may not be preserved. Moreover, the results may not be reliable and hence are difficult to interpret. As indicated by the US Food and Drug Administration draft guidance on adaptive design clinical trials, the adaptive design has to be a prospectively planned opportunity and should be based on information collected within the study, with or without formal statistical hypothesis testing. This article reviews the relative advantages, limitations, and feasibility of commonly considered adaptive designs in clinical trials. Statistical concerns when implementing adaptive designs are also discussed.
U.S. Earth Observation Programs May Still Be at Risk
NASA Astrophysics Data System (ADS)
Zielinski, Sarah
2005-10-01
A recent interim report from a committee of the National Research Council (NRC) of the U.S. National Academies warned that the U.S. system of environmental satellites was ``at risk of collapse'' (see Eos, 10 May 2005, p. 186). Nearly six months later, despite assurances from NASA that the agency would work to address in its fiscal year (FY) 2007 budget some of the imbalances that have led to mission delays and cancellations, these satellite programs may still be at risk. NASA funding for Earth science has suffered in recent years due to several pressures on the budget: deficit reduction, efforts to restore the space shuttle program, and plans for missions to the Moon and Mars. The NRC report, which was released as a draft in April and in its final form on 8 September, noted that six planned missions with implications for Earth science research were delayed, descoped, or canceled in the proposed FY2006 NASA budget.
Probabilistic Seismic Hazard Assessment for Iraq
DOE Office of Scientific and Technical Information (OSTI.GOV)
Onur, Tuna; Gok, Rengin; Abdulnaby, Wathiq
Probabilistic Seismic Hazard Assessments (PSHA) form the basis for most contemporary seismic provisions in building codes around the world. The current building code of Iraq was published in 1997. An update to this edition is in the process of being released. However, there are no national PSHA studies in Iraq for the new building code to refer to for seismic loading in terms of spectral accelerations. As an interim solution, the new draft building code was considering to refer to PSHA results produced in the late 1990s as part of the Global Seismic Hazard Assessment Program (GSHAP; Giardini et al.,more » 1999). However these results are: a) more than 15 years outdated, b) PGA-based only, necessitating rough conversion factors to calculate spectral accelerations at 0.3s and 1.0s for seismic design, and c) at a probability level of 10% chance of exceedance in 50 years, not the 2% that the building code requires. Hence there is a pressing need for a new, updated PSHA for Iraq.« less
Voils, Corrine I; Levine, Erica; Gierisch, Jennifer M; Pendergast, Jane; Hale, Sarah L; McVay, Megan A; Reed, Shelby D; Yancy, William S; Bennett, Gary; Strawbridge, Elizabeth M; White, Allison C; Shaw, Ryan J
2018-02-01
The obesity epidemic has negative physical, psychological, and financial consequences. Despite the existence of effective behavioral weight loss interventions, many individuals do not achieve adequate weight loss, and most regain lost weight in the year following intervention. We report the rationale and design for a 2×2 factorial study that involves financial incentives for dietary self-monitoring (yes vs. no) and/or interim weight loss (yes vs. no). Outpatients with obesity participate in a 24-week, group-based weight loss intervention. All participants are asked to record their daily dietary and liquid intake on a smartphone application (app) and to weigh themselves daily at home on a study-provided cellular scale. An innovative information technology (IT) solution collates dietary data from the app and weight from the scale. Using these data, an algorithm classifies participants weekly according to whether they met their group's criteria to receive a cash reward ranging from $0 to $30 for dietary self-monitoring and/or interim weight loss. Notice of the reward is provided via text message, and credit is uploaded to a gift card. This pilot study will provide information on the feasibility of using this novel IT solution to provide variable-ratio financial incentives in real time via its effects on recruitment, intervention adherence, retention, and cost. This study will provide the foundation for a comprehensive, adequately-powered, randomized controlled trial to promote short-term weight loss and long-term weight maintenance. If efficacious, this approach could reduce the prevalence, adverse outcomes, and costs of obesity for millions of Americans. Clinicaltrials.gov registration: NCT02691260. Published by Elsevier Inc.
Sewalt, Vincent; LaMarta, James; Shanahan, Diane; Gregg, Lori; Carrillo, Roberto
2017-09-01
Present letter is aimed at clarifying some critical points highlighted by Hanlon et al. regarding the common knowledge element of the safety of food enzymes in support of their GRAS designation. Particularly, we outline the development of peer-reviewed, generally recognized safety evaluation methodology for microbial enzymes and its adoption by the enzyme industry, which provides the US FDA with a review framework for enzyme GRAS Notices. This approach may serve as a model to other food ingredient categories for a scientifically sound, rigorous, and transparent application of the GRAS concept. Copyright © 2017 Elsevier Ltd. All rights reserved.
Analysis of Transportation Options for Commercial Spent Fuel in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalinina, Elena; Busch, Ingrid Karin
The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less
NASA Astrophysics Data System (ADS)
Coppola, E.; Sobolowski, S.
2017-12-01
The join EURO-CORDEX and Med-CORDEX Flagship Pilot Study dedicated to the frontier research of using convective permitting (CP) models to address the impact of human induced climate change on convection, has been recently approved and the scientific community behind the project is made of 30 different scientific European institutes. The motivations for such a challenge is the availability of large field campaigns dedicated to the study of heavy precipitation events; the increased computing capacity and model developments; the emerging trend signals in extreme precipitation at daily and mainly sub-daily time scale in the Mediterranean and Alpine regions and the priority of convective extreme events under the WCRP Grand Challenge on climate extremes. The main objective of this effort are to investigate convective-scale events, their processes and changes in a few key regions of Europe and the Mediterranean using CP RCMs, statistical models and available observations. To provide a collective assessment of the modeling capacity at CP scale and to shape a coherent and collective assessment of the consequences of climate change on convective event impacts at local to regional scales. The scientific aims of this research are to investigate how the convective events and the damaging phenomena associated with them will respond to changing climate conditions in different European climates zone. To understand if an improved representation of convective phenomena at convective permitting scales will lead to upscaled added value and finally to assess the possibility to replace these costly convection-permitting experiments with statistical approaches like "convection emulators". The common initial domain will be an extended Alpine domain and all the groups will simulate a minimum of 10 years period with ERA-interim boundary conditions, with the possibility of other two sub-domains one in the Northwest continental Europe and another in the Southeast Mediterranean. The scenario simulations will be completed for three different 10 years time slices one in the historical period, one in the near future and the last one in the far future for the RCP8.5 scenario. The first target of this scientific community is to have an ensemble of 1-2 years ERA-interim simulations ready by late 2017 and a set of test cases to use as a pilot study.
Validation of Minimum Display Requirements for a UAS Detect and Avoid System
NASA Technical Reports Server (NTRS)
Rorie, Conrad; Fern, Lisa; Roberts, Zach; Monk, Kevin; Santiago, Confesor; Shively, Jay
2017-01-01
The full integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS), a prerequisite for enabling a broad range of public and commercial UAS operations, presents several technical challenges to UAS developers, operators and regulators. A primary barrier is the inability for UAS pilots (situated at a ground control station, or GCS) to comply with Title 14 Code of Federal Regulations sections 91.111 and 91.113, which require pilots to see and avoid other aircraft in order to maintain well clear. The present study is the final in a series of human-in-the-loop experiments designed to explore and test the various display and alerting requirements being incorporated into the minimum operational performance standards (MOPS) for a UAS-specific detect and avoid system that would replace the see and avoid function required of manned aircraft. Two display configurations were tested - an integrated display and a standalone display - and their impact on pilot response times and ability to maintain DAA well clear were compared. Results indicated that the current draft of the MOPS result in high-level performance and did not meaningfully differ by display configuration.
An interim report on the MCAT Essay Pilot Project.
Koenig, J A; Mitchell, K J
1988-01-01
Results from four pilot administrations of the Medical College Admission Test essay question are reported. Analyses focused on (a) the performance characteristics of sample groups differentiated by gender, size of hometown, race/ethnicity, and dominant language; (b) the relationships between essay scores and academic/demographic characteristics; and (c) the reliability of one 45-minute versus two 30-minute essays. No differences were found for examinees grouped by gender and size of home community. Mean differences among the racial/ethnic groups were explained largely by reading level differences. Differences in essay performance by language group were large and unexplained by reading level differences. No relationship was found between the essay score and the academic/demographic characteristics. Reliability estimates for two 30-minute essays were higher than for one 45-minute essay; however, the 30-minute period yielded writing of poorer quality. Test-retest reliabilities for the 45-minute topics will remain the focus of future studies as will performance by examinees for whom English is a second language. The impact of the essay on the selection process will also be assessed.
76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
Genomic Encyclopedia of Type Strains, Phase I: The one thousand microbial genomes (KMG-I) project
Kyrpides, Nikos C.; Woyke, Tanja; Eisen, Jonathan A.; ...
2014-06-15
The Genomic Encyclopedia of Bacteria and Archaea (GEBA) project was launched by the JGI in 2007 as a pilot project with the objective of sequencing 250 bacterial and archaeal genomes. The two major goals of that project were (a) to test the hypothesis that there are many benefits to the use the phylogenetic diversity of organisms in the tree of life as a primary criterion for generating their genome sequence and (b) to develop the necessary framework, technology and organization for large-scale sequencing of microbial isolate genomes. While the GEBA pilot project has not yet been entirely completed, both ofmore » the original goals have already been successfully accomplished, leading the way for the next phase of the project. Here we propose taking the GEBA project to the next level, by generating high quality draft genomes for 1,000 bacterial and archaeal strains. This represents a combined 16-fold increase in both scale and speed as compared to the GEBA pilot project (250 isolate genomes in 4+ years). We will follow a similar approach for organism selection and sequencing prioritization as was done for the GEBA pilot project (i.e. phylogenetic novelty, availability and growth of cultures of type strains and DNA extraction capability), focusing on type strains as this ensures reproducibility of our results and provides the strongest linkage between genome sequences and other knowledge about each strain. In turn, this project will constitute a pilot phase of a larger effort that will target the genome sequences of all available type strains of the Bacteria and Archaea.« less
Genomic Encyclopedia of Type Strains, Phase I: The one thousand microbial genomes (KMG-I) project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kyrpides, Nikos C.; Woyke, Tanja; Eisen, Jonathan A.
The Genomic Encyclopedia of Bacteria and Archaea (GEBA) project was launched by the JGI in 2007 as a pilot project with the objective of sequencing 250 bacterial and archaeal genomes. The two major goals of that project were (a) to test the hypothesis that there are many benefits to the use the phylogenetic diversity of organisms in the tree of life as a primary criterion for generating their genome sequence and (b) to develop the necessary framework, technology and organization for large-scale sequencing of microbial isolate genomes. While the GEBA pilot project has not yet been entirely completed, both ofmore » the original goals have already been successfully accomplished, leading the way for the next phase of the project. Here we propose taking the GEBA project to the next level, by generating high quality draft genomes for 1,000 bacterial and archaeal strains. This represents a combined 16-fold increase in both scale and speed as compared to the GEBA pilot project (250 isolate genomes in 4+ years). We will follow a similar approach for organism selection and sequencing prioritization as was done for the GEBA pilot project (i.e. phylogenetic novelty, availability and growth of cultures of type strains and DNA extraction capability), focusing on type strains as this ensures reproducibility of our results and provides the strongest linkage between genome sequences and other knowledge about each strain. In turn, this project will constitute a pilot phase of a larger effort that will target the genome sequences of all available type strains of the Bacteria and Archaea.« less
Facial disability index (FDI): Adaptation to Spanish, reliability and validity
Gonzalez-Cardero, Eduardo; Cayuela, Aurelio; Acosta-Feria, Manuel; Gutierrez-Perez, Jose-Luis
2012-01-01
Objectives: To adapt to Spanish the facial disability index (FDI) described by VanSwearingen and Brach in 1995 and to assess its reliability and validity in patients with facial nerve paresis after parotidectomy. Study Design: The present study was conducted in two different stages: a) cross-cultural adaptation of the questionnaire and b) cross-sectional study of a control group of 79 Spanish-speaking patients who suffered facial paresis after superficial parotidectomy with facial nerve preservation. The cross-cultural adaptation process comprised the following stages: (I) initial translation, (II) synthesis of the translated document, (III) retro-translation, (IV) review by a board of experts, (V) pilot study of the pre-final draft and (VI) analysis of the pilot study and final draft. Results: The reliability and internal consistency of every one of the rating scales included in the FDI (Cronbach’s alpha coefficient) was 0.83 for the complete scale and 0.77 and 0.82 for the physical and the social well-being subscales. The analysis of the factorial validity of the main components of the adapted FDI yielded similar results to the original questionnaire. Bivariate correlations between FDI and House-Brackmann scale were positive. The variance percentage was calculated for all FDI components. Conclusions: The FDI questionnaire is a specific instrument for assessing facial neuromuscular dysfunction which becomes a useful tool in order to determine quality of life in patients with facial nerve paralysis. Spanish adapted FDI is equivalent to the original questionnaire and shows similar reliability and validity. The proven reproducibi-lity, reliability and validity of this questionnaire make it a useful additional tool for evaluating the impact of facial nerve paralysis in Spanish-speaking patients. Key words:Parotidectomy, facial nerve paralysis, facial disability. PMID:22926474
Evans, P H; Greaves, C; Winder, R; Fearn-Smith, J; Campbell, J L
2007-07-01
To identify key messages about pre-diabetes and to design, develop and pilot an educational toolkit to address the information needs of patients and health professionals. Mixed qualitative methodology within an action research framework. Focus group interviews with patients and health professionals and discussion with an expert reference group aimed to identify the important messages and produce a draft toolkit. Two action research cycles were then conducted in two general practices, during which the draft toolkit was used and video-taped consultations and follow-up patient interviews provided further data. Framework analysis techniques were used to examine the data and to elicit action points for improving the toolkit. The key messages about pre-diabetes concerned the seriousness of the condition, the preventability of progression to diabetes, and the need for lifestyle change. As well as feedback on the acceptability and use of the toolkit, four main themes were identified in the data: knowledge and education needs (of both patients and health professionals); communicating knowledge and motivating change; redesign of practice systems to support pre-diabetes management and the role of the health professional. The toolkit we developed was found to be an acceptable and useful resource for both patients and health practitioners. Three key messages about pre-diabetes were identified. A toolkit of information materials for patients with pre-diabetes and the health professionals and ideas for improving practice systems for managing pre-diabetes were developed and successfully piloted. Further work is needed to establish the best mode of delivery of the WAKEUP toolkit.
Developing 21st century accreditation standards for teaching hospitals: the Taiwan experience.
Huang, Chung-I; Wung, Cathy; Yang, Che-Ming
2009-12-15
The purpose of this study is to establish teaching hospital accreditation standards anew with the hope that Taiwan's teaching hospitals can live up to the expectations of our society and ensure quality teaching. The development process lasted two years, 2005-2006, and was separated into three stages. The first stage centered on leadership meetings and consensus building, the second on drafting the new standards with expert focus groups, and the third on a pilot study and subsequent revision. Our new teaching hospital accreditation standards have six categories and 95 standards as follows: educational resources (20 items), teaching and training plans and outcomes (42 items), research and results (9 items), development of clinical faculty and continuing education (8 items), academic exchanges and community education (8 items), and administration (8 items). The new standards have proven feasible and posed reasonable challenges in the pilot study. We hope the new standards will strengthen teaching and research, and improve the quality of hospital services at the same time.
Tadić, Valerija; Cooper, Andrew; Cumberland, Phillippa; Lewando-Hundt, Gillian; Rahi, Jugnoo S
2013-12-01
To develop a novel age-appropriate measure of functional vision (FV) for self-reporting by visually impaired (VI) children and young people. Questionnaire development. A representative patient sample of VI children and young people aged 10 to 15 years, visual acuity of the logarithm of the minimum angle of resolution (logMAR) worse than 0.48, and a school-based (nonrandom) expert group sample of VI students aged 12 to 17 years. A total of 32 qualitative semistructured interviews supplemented by narrative feedback from 15 eligible VI children and young people were used to generate draft instrument items. Seventeen VI students were consulted individually on item relevance and comprehensibility, instrument instructions, format, and administration methods. The resulting draft instrument was piloted with 101 VI children and young people comprising a nationally representative sample, drawn from 21 hospitals in the United Kingdom. Initial item reduction was informed by presence of missing data and individual item response pattern. Exploratory factor analysis (FA) and parallel analysis (PA), and Rasch analysis (RA) were applied to test the instrument's psychometric properties. Psychometric indices and validity assessment of the Functional Vision Questionnaire for Children and Young People (FVQ_CYP). A total of 712 qualitative statements became a 56-item draft scale, capturing the level of difficulty in performing vision-dependent activities. After piloting, items were removed iteratively as follows: 11 for high percentage of missing data, 4 for skewness, and 1 for inadequate item infit and outfit values in RA, 3 having shown differential item functioning across age groups and 1 across gender in RA. The remaining 36 items showed item fit values within acceptable limits, good measurement precision and targeting, and ordered response categories. The reduced scale has a clear unidimensional structure, with all items having a high factor loading on the single factor in FA and PA. The summary scores correlated significantly with visual acuity. We have developed a novel, psychometrically robust self-report questionnaire for children and young people-the FVQ_CYP-that captures the functional impact of visual disability from their perspective. The 36-item, 4-point unidimensional scale has potential as a complementary adjunct to objective clinical assessments in routine pediatric ophthalmology practice and in research. Copyright © 2013 American Academy of Ophthalmology. Published by Elsevier Inc. All rights reserved.
Challenge To Apollo: The Soviet Union and The Space Race, 1945-1974
NASA Technical Reports Server (NTRS)
Siddiqi, Asif A.
2000-01-01
This book is, in essence, sixteen years in the making. First attempted to compile a history of the Soviet space program in 1982 author put together a rough chronology of the main events. A decade later, while living on a couch in a college friend's apartment, he began writing what would be a short history of the Soviet lunar landing program. The first draft was sixty-nine pages long. Late the following year, he decided to expand the topic to handle all early Soviet piloted exploration programs. That work eventually grew into what you are holding in your hand now.
77 FR 44528 - Dry Cargo Residue Discharges in the Great Lakes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
...The Coast Guard proposes replacing its existing interim rule with a new rule to regulate the operation of U.S. and foreign vessels carrying bulk dry cargo such as limestone, iron ore, and coal on the U.S. waters of the Great Lakes, and the operation of U.S. bulk dry cargo vessels anywhere on the Great Lakes. Specifically, the Coast Guard proposes new requirements for the discharge of bulk dry cargo residue (DCR) on the U.S. waters of the Great Lakes. The Coast Guard also announces the availability of the tiered Draft Environmental Impact Statement (DEIS) prepared in support of this proposal. The proposed rule would continue to allow non-hazardous and non-toxic discharges of bulk DCR in limited areas of the Great Lakes. However, vessel owners and operators would need to minimize DCR discharges using methods they would be required to document in DCR management plans. The proposed rule would prohibit limestone and clean stone DCR discharges in some waters where they are now permitted. The proposed rule promotes the Coast Guard's strategic goals of maritime mobility and safety and protection of natural resources.
South African court rejects country's new constitution.
1996-09-20
Fundamental principles designed to ensure that South Africa's new constitution upholds a wide range of individual rights and freedoms and establishes a responsive government with a balanced separation of powers, including recognition of the role of traditional tribal leadership, were adopted into the current interim constitution shortly before the 1994 free elections which brought Nelson Mandela and the African National Congress to power. In a judgement issued on September 6, 1996, South Africa's Constitutional Court rejected the country's new draft constitution, arguing that it failed to meet the standards of nine of the 34 principles established at the Kempton Park negotiations. The Constitutional Assembly is comprised of a joint meeting of the National Assembly and Senate. One of the court's major objections to the constitution concerned the proposed structure of rule, which was seen to give inadequate power to South Africa's nine provinces as compared with the national government. However, the bill of rights was almost entirely upheld. The bill would create a favorable environment for legalized abortion and guarantee a universal right of access to health care, including reproductive health services
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bolton, P.A.
1987-11-01
This report describes the housing stock and its availability in Benton and Franklin counties. Depending on the specific measures, data are presented for the entire MSA, for Benton and Franklin counties separately, for incorporated and unincorporated areas within the counties, and for specific incorporated areas. The most detailed data are available for the two counties and for the major cities of Kennewick and Richland in Benton County and Pasco in Franklin County. In 1986, 64 percent of the population of Benton County and 66 percent of the housing units were in Kennewick and Richland. Seventy-three percent of the population andmore » 75 percent of the housing were in the incorporated area of Benton County. In Franklin County, Pasco accounted for 52 percent of the county's 1986 population and 57 percent of its housing. Fifty-nine percent of the population and 63 percent of the housing were in the incorporated areas of Franklin County. More detailed data are needed to fully describe the housing conditions in the jurisdictions described here. 13 refs., 9 tabs.« less
Aggarwal, Swati P; Zinman, Lorne; Simpson, Elizabeth; McKinley, Jane; Jackson, Katherine E; Pinto, Hanika; Kaufman, Petra; Conwit, Robin A; Schoenfeld, David; Shefner, Jeremy; Cudkowicz, Merit
2010-05-01
In a pilot study, lithium treatment slowed progression of amyotrophic lateral sclerosis (ALS). We aimed to confirm or disprove these findings by assessing the safety and efficacy of lithium in combination with riluzole in patients with ALS. We did a double-blind, placebo-controlled trial with a time-to-event design. Between January and June, 2009, patients with ALS who were taking a stable dose of riluzole for at least 30 days were randomly assigned (1:1) by a centralised computer to receive either lithium or placebo. Patients, caregivers, investigators, and all site study staff with the exception of site pharmacists were masked to treatment assignment. The primary endpoint was the time to an event, defined as a decrease of at least six points on the revised ALS functional rating scale score or death. Interim analyses were planned for when 84 patients had been allocated treatment, 6 months later or after 55 events, and after 100 events. Analysis was by intention to treat. The stopping boundary for futility at the first interim analysis was a p value of at least 0.68. We used a log-rank test to compare the distributions of the time to an event between the lithium and placebo groups. This trial is registered with ClinicalTrials.gov, NCT00818389. At the first interim analysis, 22 of 40 patients in the lithium group had an event compared with 20 of 44 patients in the placebo group (log rank p=0.51). The hazard ratio of reaching the primary endpoint was 1.13 (95% CI 0.61-2.07). The study was stopped at the first interim analysis because criterion for futility was met (p=0.78). The difference in mean decline in the ALS functional rating scale score between the lithium group and the placebo group was 0.15 (95% CI -0.43 to 0.73, p=0.61). There were no major safety concerns. Falls (p=0.04) and back pain (p=0.05) were more common in the lithium group than in the placebo group. We found no evidence that lithium in combination with riluzole slows progression of ALS more than riluzole alone. The time-to-event endpoint and use of prespecified interim analyses enabled a clear result to be obtained rapidly. This design should be considered for future trials testing the therapeutic efficacy of drugs that are easily accessible to people with ALS. National Institute of Neurological Disorders and Stroke, ALS Association, and ALS Society of Canada. Copyright 2010 Elsevier Ltd. All rights reserved.
Kaizer, Franceen; Kim, Angela; Van, My Tram; Korner-Bitensky, Nicol
2010-03-01
Patients with stroke should be screened for safety prior to starting a self-medication regime. An extensive literature review revealed no standardized self-medication tool tailored to the multi-faceted needs of the stroke population. The aim of this study was to create and validate a condition-specific tool to be used in screening for self-medication safety in individuals with stroke. Items were generated using expert consultation and review of the existing tools. The draft tool was pilot-tested on expert stroke clinicians to receive feedback on content, clarity, optimal cueing and domain omissions. The final version was piloted on patients with stroke using a structured interviewer-administered interview. The tool was progressively refined and validated according to feedback from the 11 expert reviewers. The subsequent version was piloted on patients with stroke. The final version includes 16 questions designed to elicit information on 5 domains: cognition, communication, motor, visual-perception and, judgement/executive function/self-efficacy. The Screening for Safe Self-medication post-Stroke Scale (S-5) has been created and validated for use by health professionals to screen self-medication safety readiness of patients after stroke. Its use should also help to guide clinicians' recommendations and interventions aimed at enhancing self-medication post-stroke.
Fuel-Flexible Gasification-Combustion Technology for Production of H2 and Sequestration-Ready CO2
DOE Office of Scientific and Technical Information (OSTI.GOV)
George Rizeq; Janice West; Raul Subia
GE Global Research is developing an innovative energy technology for coal gasification with high efficiency and near-zero pollution. This Unmixed Fuel Processor (UFP) technology simultaneously converts coal, steam and air into three separate streams of hydrogen-rich gas, sequestration-ready CO{sub 2}, and high-temperature, high-pressure vitiated air to produce electricity in gas turbines. This is the draft final report for the first stage of the DOE-funded Vision 21 program. The UFP technology development program encompassed lab-, bench- and pilot-scale studies to demonstrate the UFP concept. Modeling and economic assessments were also key parts of this program. The chemical and mechanical feasibility weremore » established via lab and bench-scale testing, and a pilot plant was designed, constructed and operated, demonstrating the major UFP features. Experimental and preliminary modeling results showed that 80% H{sub 2} purity could be achieved, and that a UFP-based energy plant is projected to meet DOE efficiency targets. Future work will include additional pilot plant testing to optimize performance and reduce environmental, operability and combined cycle integration risks. Results obtained to date have confirmed that this technology has the potential to economically meet future efficiency and environmental performance goals.« less
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
Seaside, Oregon, Tsunami Vulnerability Assessment Pilot Study
NASA Astrophysics Data System (ADS)
Dunbar, P. K.; Dominey-Howes, D.; Varner, J.
2006-12-01
The results of a pilot study to assess the risk from tsunamis for the Seaside-Gearhart, Oregon region will be presented. To determine the risk from tsunamis, it is first necessary to establish the hazard or probability that a tsunami of a particular magnitude will occur within a certain period of time. Tsunami inundation maps that provide 100-year and 500-year probabilistic tsunami wave height contours for the Seaside-Gearhart, Oregon, region were developed as part of an interagency Tsunami Pilot Study(1). These maps provided the probability of the tsunami hazard. The next step in determining risk is to determine the vulnerability or degree of loss resulting from the occurrence of tsunamis due to exposure and fragility. The tsunami vulnerability assessment methodology used in this study was developed by M. Papathoma and others(2). This model incorporates multiple factors (e.g. parameters related to the natural and built environments and socio-demographics) that contribute to tsunami vulnerability. Data provided with FEMA's HAZUS loss estimation software and Clatsop County, Oregon, tax assessment data were used as input to the model. The results, presented within a geographic information system, reveal the percentage of buildings in need of reinforcement and the population density in different inundation depth zones. These results can be used for tsunami mitigation, local planning, and for determining post-tsunami disaster response by emergency services. (1)Tsunami Pilot Study Working Group, Seaside, Oregon Tsunami Pilot Study--Modernization of FEMA Flood Hazard Maps, Joint NOAA/USGS/FEMA Special Report, U.S. National Oceanic and Atmospheric Administration, U.S. Geological Survey, U.S. Federal Emergency Management Agency, 2006, Final Draft. (2)Papathoma, M., D. Dominey-Howes, D.,Y. Zong, D. Smith, Assessing Tsunami Vulnerability, an example from Herakleio, Crete, Natural Hazards and Earth System Sciences, Vol. 3, 2003, p. 377-389.
NASA Technical Reports Server (NTRS)
Tarter, Jill; Backus, Peter
1995-01-01
Curriculum materials based on the search for extraterrestrial intelligence (SETI) were developed for grades 3 through 9 science classes. The project was supported in part by NASA. Six teacher's guides, plus ancillary visuals, addressing topics in astronomy, biology, chemistry, geosciences, and physics as well as mathematics, social sciences, and language arts, were designed by a team of teachers, scientists. curriculum developers, and artists. First drafts were piloted by 10 design team teachers; revised drafts were field tested by 109 teachers in 30 states. Extensive feedback from these teachers and their students and reviews by scientists were used to revise materials prior to submission to the publisher. The field test teachers overall ranking of all guides (data from individual lesson feedback forms) was 431 on a one low to five high scale; 85% found the content appropriate to course and grade level and 75% indicated they had no reservations about using the materials again or recommending them to colleagues. The ratio of liked to disliked student responses (from 1305 student letters) was 70:30. Most recommendations from the teachers, students, and science reviewers were incorporated in the final versions for the guides, published by Libraries Unlimited/Teacher Ideas Press, 1995.
ERIC Educational Resources Information Center
Anyaso, Hilary Hurd
2009-01-01
The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…
40 CFR 155.56 - Interim registration review decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruno, M.J.
1981-04-01
Operation of the bench AF-reactor on burden with all reducing carbon exterior to the ore pellet resulted in low metal alloy product yields and prematurely terminated runs, indicating the need for intimate contact between alumina and carbon to produce oxycarbide liquid prior to reaction with solid silicon carbide. Carbon solubility tests made on 60Al-40Si alloys at 2200/sup 0/C in graphite crucibles indicated continued reaction to form SiC for one hour. Efficiency of reduction to SiC ranged from 68 to 100%. The A-C two-electrode submerged arc reactor pilot, SAR-II, was successfully operated on both alumina-clay-coke and alumina-silicon carbide-coke (from the VSRmore » prereduction) burdens. Metal alloy was produced and tapped in each of four runs. The pilot crystallizer was operated to evalute the two-stage (stop and go) crystallization technique on obtaining high yields of Al in Al-Si eutectic, with a limit of 1.0% Fe and 0.1% Ti in the alloy product. 18 figures, 19 tables. (DLC)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruno, M.J.
1980-10-01
Pilot reactor VSR-3 was operated with 75 to 120 SCFH O/sub 2/ to supply part of the process heat requirements by combustion of coke. No alloy was made and burden bridging persistently stopped operations. Burning larger coke particles, -3/8 in. +6 mesh, with O/sub 2/ injected through a larger diameter tuyere orifice resulted in oxygen attack on the reactor graphite liner. Updated thermochemical data for Al/sub 2/O/sub 3/ significantly changed the calculated reflux loading for a one-atm blast furnace, predicting almost total reflux and no alloy recovery. Based on these calculations and the experimental problems with combustion heated operation, VSR-3more » was modified to study an alternate reduction concept - the blast-arc - which utilizes combustion heat to reduce SiO/sub 2/ to SiC at 1600/sup 0/C, and electrical heat to complete the reduction of Al/sub 2/O/sub 3/ and the production of alloy. Design, fabrication, and installation of most of the pilot crystallizer sytem was completed.« less
17 CFR 210.8-03 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...
7 CFR 1738.21 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...
Using evidence-based leadership initiatives to create a healthy nursing work environment.
Nayback-Beebe, Ann M; Forsythe, Tanya; Funari, Tamara; Mayfield, Marie; Thoms, William; Smith, Kimberly K; Bradstreet, Harry; Scott, Pamela
2013-01-01
In an effort to create a healthy nursing work environment in a military hospital Intermediate Care Unit (IMCU), a facility-level Evidence Based Practice working group composed of nursing.Stakeholders brainstormed and piloted several unit-level evidence-based leadership initiatives to improve the IMCU nursing work environment. These initiatives were guided by the American Association of Critical Care Nurses Standards for Establishing and Sustaining Healthy Work Environments which encompass: (1) skilled communication, (2) true collaboration, (3) effective decision making, (4) appropriate staffing, (5) meaningful recognition, and (6) authentic leadership. Interim findings suggest implementation of these six evidence-based, relationship-centered principals, when combined with IMCU nurses' clinical expertise, management experience, and personal values and preferences, improved staff morale, decreased staff absenteeism, promoted a healthy nursing work environment, and improved patient care.
Simulator sickness in a helicopter flight training school.
Webb, Catherine M; Bass, Julie M; Johnson, David M; Kelley, Amanda M; Martin, Christopher R; Wildzunas, Robert M
2009-06-01
Simulator sickness (SS) is a common problem during flight training and can affect both instructor pilots (IP) and student pilots (SP). This study was conducted in response to complaints about a high incidence of SS associated with use of new simulators for rotary-wing aircraft. The problem was evaluated using the Simulator Sickness Questionnaire (SSQ) to collect data on 73 IP and 129 SP who used the new simulators. Based on analysis of these data, operator comments, and a search of the literature, we recommended limiting simulator flights to 2 h, removing unusual or unnatural maneuvers, turning off the sidescreens to reduce the field-of-view, avoiding use of improperly calibrated simulators until repaired, and stressing proper rest and health discipline among the pilots. The success of these measures was evaluated 1 yr later by collecting SSQ data on 25 IP and 50 SP. There was a main effect of time, in that after the recommendations were implemented, there was a significant reduction in nausea, oculomotor, and total SSQ scores from the pre-study to the post-study. There was also a main effect of experience, as IP reported significantly greater SS than SP for the same scores. Implementation of the recommendations reduced SS in the new simulators at the cost of limiting session duration and shutting down some simulator features. Although the optimal solution to the SS problem lies in addressing SS during a simulator's design stage, these recommendations can be used as interim solutions to reduce SS.
Wei, Karin; Feldmann, Robert E; Brascher, Anne-Kathrin; Benrath, Justus
2014-12-01
This preliminary and retrospective pilot case series examines a treatment concept consisting of ultrasound-guided stellate ganglion blocks (SGBs) combined with pharmacological and occupational therapy in patients with complex regional pain syndrome (CRPS) of the hand. Efficacy of combined treatment concepts and safety of ultrasound-guided SGB have not been sufficiently investigated yet. A total number of 156 blocks were evaluated in 16 patients with CRPS in a retrospective analysis. All patients received pharmacotherapy and a standard regimen of occupational therapy offered simultaneously to the SGBs. Changes in both spontaneous and evoked pain levels were assessed by numerical pain rating score before and after the last blockade of a series. Side effects were documented. The overall mean pain reduction was 63.2% regarding spontaneous and 45.3% regarding evoked pain. Mild complications, such as hoarseness or dysphagia, occurred in 13.5% of the blocks (21 SGBs). Serious complications, such as plexus paresis or accidental puncture of vessels or other structures, did not occur. Time between symptom onset and start of treatment did not affect the extent of pain reduction. The combination of ultrasound-guided SGB and simultaneous pharmacological and occupational therapy showed encouraging treatment results under conditions of this pilot case series. Assessment of efficacy of this combined treatment concept and safety of ultrasound-guided SGB require further prospective clinical studies with larger number of participants. Wiley Periodicals, Inc.
An Approach for Evaluating the Technical Quality of Interim Assessments
ERIC Educational Resources Information Center
Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian
2010-01-01
Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…
47 CFR 51.611 - Interim wholesale rates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...
7 CFR 15a.71 - Interim procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...
7 CFR 1735.75 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2014 CFR
2014-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2013 CFR
2013-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2012 CFR
2012-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2011 CFR
2011-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...
Interim Administrators in Higher Education: A National Study
ERIC Educational Resources Information Center
Huff, Marie Thielke; Neubrander, Judy
2015-01-01
The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…
de Lusignan, Simon; Dos Santos, Gaël; Correa, Ana; Haguinet, François; Yonova, Ivelina; Lair, Florence; Byford, Rachel; Ferreira, Filipa; Stuttard, Karen; Chan, Tom
2017-05-17
To pilot enhanced safety surveillance of seasonal influenza vaccine meeting the European Medicines Agency (EMA) requirement to rapidly detect a significant increase in the frequency or severity of adverse events of interest (AEIs), which may indicate risk from the new season's vaccine. A prospective passive enhanced safety surveillance combining data collection from adverse drug reaction (ADR) cards with automated collection of pseudonymised routinely collected electronic health record (EHR) data. This study builds on a feasibility study carried out at the start of the 2015/2016 influenza season. We will report influenza vaccine exposure and any AEIs reported via ADR card or recorded directly into the EHR, from the commencement of influenza vaccination and ends as specified by EMA (30 November 2016). Ten volunteer English general practices, primarily using the GSK influenza vaccines. They had selected this vaccine in advance of the study. People who receive a seasonal influenza vaccine, in each age group defined in EMA interim guidance: 6 months to 5 years, 6-12 years, 13-17 years, 18-65 years and >65 years. The primary outcome measure is the rate of AEIs occurring within 7 days postvaccination, using passive surveillance of general practitioner (GP) EHR systems enhanced by a card-based ADR reporting system. Extracted data will be presented overall by brand (Fluarix Tetra vs others), by age strata and risk groups. The secondary outcome measure is the vaccine uptake among the subjects registered in the enrolled general practices. Ethical approval was granted by the Proportionate Review Sub-committee of the North East-Newcastle & North Tyneside 2 on 5 August 2016. The study received approval from the Health Research Authority on 1 September 2016. We will produce an interim analysis within 8 weeks, and an end-of-study report, which will be submitted to peer-reviewed journals. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
National Science Foundation-sponsored workshop report. Draft plan for soybean genomics.
Stacey, Gary; Vodkin, Lila; Parrott, Wayne A; Shoemaker, Randy C
2004-05-01
Recent efforts to coordinate and define a research strategy for soybean (Glycine max) genomics began with the establishment of a Soybean Genetics Executive Committee, which will serve as a communication focal point between the soybean research community and granting agencies. Secondly, a workshop was held to define a strategy to incorporate existing tools into a framework for advancing soybean genomics research. This workshop identified and ranked research priorities essential to making more informed decisions as to how to proceed with large scale sequencing and other genomics efforts. Most critical among these was the need to finalize a physical map and to obtain a better understanding of genome microstructure. Addressing these research needs will require pilot work on new technologies to demonstrate an ability to discriminate between recently duplicated regions in the soybean genome and pilot projects to analyze an adequate amount of random genome sequence to identify and catalog common repeats. The development of additional markers, reverse genetics tools, and bioinformatics is also necessary. Successful implementation of these goals will require close coordination among various working groups.
Lee, Amanda J; Kane, Sarah; Ramsey, Rebecca; Good, Elizabeth; Dick, Mathew
2016-04-12
Price and affordability of foods are important determinants of health. Targeted food pricing policies may help improve population diets. However, methods producing comparable data to inform relevant policy decisions are lacking in Australia and globally. The objective was to develop and pilot standardised methods to assess the price, relative price and affordability of healthy (recommended) and current (unhealthy) diets and test impacts of a potential policy change. Methods followed the optimal approach proposed by INFORMAS using recent Australian dietary intake data and guidelines. Draft healthy and current (unhealthy) diet baskets were developed for five household structures. Food prices were collected in stores in a high and low SES location in Brisbane, Australia. Diet prices were calculated and compared with household incomes, and with potential changes to the Australian Taxation System. Wilcoxen-signed rank tests were used to compare differences in price. The draft tools and protocols were deemed acceptable at household level, but methods could be refined. All households spend more on current (unhealthy) diets than required to purchase healthy (recommended) diets, with the majority (53-64 %) of the food budget being spent on 'discretionary' choices, including take-away foods and alcohol. A healthy diet presently costs between 20-31 % of disposable income of low income households, but would become unaffordable for these families under proposed changes to expand the GST to apply to all foods in Australia. Results confirmed that diet pricing methods providing meaningful, comparable data to inform potential fiscal and health policy actions can be developed, but draft tools should be refined. Results suggest that healthy diets can be more affordable than current (unhealthy) diets in Australia, but other factors may be as important as price in determining food choices.
Development of a Mobile App for Family Planning Providers.
Halsall, Viannella; Rogers, Jennifer; Witt, Jacki; Song, Sejun; Nguyen, Hoang Duc Huy; Kelly, Patricia
To provide an overview of lessons learned during the development process of an app for iOS and Android based on national recommendations for providing quality family planning services. After a review of existing apps was conducted to determine whether an app of clinical recommendations for family planning existed, a team of clinicians, training specialists, and app developers created a resource app by first drafting a comprehensive content map. A prototype of the app was then pilot tested using smart tablets by a volunteer convenience sample of women's healthcare professionals. Outcomes measured included usability, acceptability, download analytics, and satisfaction by clinicians as reported through an investigator-developed tool. Sixty-nine professionals tested a prototype of the app, and completed a user satisfaction tool. Overall, user feedback was positive, and a zoom function was added to the final version as a result of the pilot test. Within 3 months of being publicly available, the app was downloaded 677 times, with 97% of downloads occurring on smart phones, 76% downloads occurring on iOS devices, and 24% on Android devices. This trend persisted throughout the following 3 months. Clinicians with an interest in developing an app should consider a team approach to development, pilot test the app prior to wider distribution, and develop a web-based version of the app to be used by clinicians who are unable to access smart devices in their practice setting.
Rousseau, Joseph P.; Landa, Edward R.; Nimmo, John R.; Cecil, L. DeWayne; Knobel, LeRoy L.; Glynn, Pierre D.; Kwicklis, Edward M.; Curtis, Gary P.; Stollenwerk, Kenneth G.; Anderson, Steven R.; Bartholomay, Roy C.; Bossong, Clifford R.; Orr, Brennon R.
2005-01-01
The U.S. Department of Energy (DOE) requested that the U.S. Geological Survey conduct an independent technical review of the Interim Risk Assessment (IRA) and Contaminant Screening for the Waste Area Group 7 (WAG-7) Remedial Investigation, the draft Addendum to the Work Plan for Operable Unit 7-13/14 WAG-7 comprehensive Remedial Investigation and Feasibility Study (RI/FS), and supporting documents that were prepared by Lockheed Martin Idaho Technologies, Inc. The purpose of the technical review was to assess the data and geotechnical approaches that were used to estimate future risks associated with the release of the actinides americium, uranium, neptunium, and plutonium to the Snake River Plain aquifer from wastes buried in pits and trenches at the Subsurface Disposal Area (SDA). The SDA is located at the Radioactive Waste Management Complex in southeastern Idaho within the boundaries of the Idaho National Engineering and Environmental Laboratory. Radionuclides have been buried in pits and trenches at the SDA since 1957 and 1952, respectively. Burial of transuranic wastes was discontinued in 1982. The five specific tasks associated with this review were defined in a ?Proposed Scope of Work? prepared by the DOE, and a follow-up workshop held in June 1998. The specific tasks were (1) to review the radionuclide sampling data to determine how reliable and significant are the reported radionuclide detections and how reliable is the ongoing sampling program, (2) to assess the physical and chemical processes that logically can be invoked to explain true detections, (3) to determine if distribution coefficients that were used in the IRA are reliable and if they have been applied properly, (4) to determine if transport model predictions are technically sound, and (5) to identify issues needing resolution to determine technical adequacy of the risk assessment analysis, and what additional work is required to resolve those issues.
42 CFR 418.307 - Periodic interim payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Binh T. Pham; Nancy J. Lybeck; Vivek Agarwal
The Light Water Reactor Sustainability program at Idaho National Laboratory is actively conducting research to develop and demonstrate online monitoring capabilities for active components in existing nuclear power plants. Idaho National Laboratory and the Electric Power Research Institute are working jointly to implement a pilot project to apply these capabilities to emergency diesel generators and generator step-up transformers. The Electric Power Research Institute Fleet-Wide Prognostic and Health Management Software Suite will be used to implement monitoring in conjunction with utility partners: Braidwood Generating Station (owned by Exelon Corporation) for emergency diesel generators, and Shearon Harris Nuclear Generating Station (owned bymore » Duke Energy Progress) for generator step-up transformers. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for emergency diesel generators. Emergency diesel generators provide backup power to the nuclear power plant, allowing operation of essential equipment such as pumps in the emergency core coolant system during catastrophic events, including loss of offsite power. Technical experts from Braidwood are assisting Idaho National Laboratory and Electric Power Research Institute in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the Fleet-Wide Prognostic and Health Management Software Suite and tested using data from Braidwood. Parallel research on generator step-up transformers was summarized in an interim report during the fourth quarter of fiscal year 2012.« less
Au, Angel H.Y.; Lam, Wendy W.T.; Chan, Miranda C.M.; Or, Amy Y.M.; Kwong, Ava; Suen, Dacita; Wong, Annie L.; Juraskova, Ilona; Wong, Teresa W.T.; Fielding, Richard
2011-01-01
Abstract Background Women choosing breast cancer surgery encounter treatment decision‐making (TDM) difficulties, which can cause psychological distress. Decision Aids (DAs) may facilitate TDM, but there are no DAs designed for Chinese populations. We developed a DA for Chinese women newly diagnosed with breast cancer, for use during the initial surgical consultation. Aims Conduct a pilot study to assess the DA acceptability and utility among Chinese women diagnosed with breast cancer. Methods Women preferred the DA in booklet format. A booklet was developed and revised and evaluated in two consecutive pilot studies (P1 and P2). On concluding their initial diagnostic consultation, 95 and 38 Chinese women newly diagnosed with breast cancer received the draft and revised draft DA booklet, respectively. Four‐day post‐consultation, women had questionnaires read out to them and to which they responded assessing attitudes towards the DA and their understanding of treatment options. Results The original DA was read/partially read by 66/22% (n = 84) of women, whilst the revised version was read/partially read by 74/16% (n = 35), including subliterate women (χ2 = 0.76, P = 0.679). Knowledge scores varied with the extent the booklet was read (P1: F = 12.68, d.f. 2, P < 0.001; P2: F = 3.744, d.f. 2, P = 0.034). The revised, shorter version was graphically rich and resulted in improved perceived utility, [except for the ‘treatment options’ (χ2 = 5.50, P = 0.019) and ‘TDM guidance’ (χ2 = 8.19, P = 0.004) sections] without increasing anxiety (F = 0.689, P = 0.408; F = 3.45, P = 0.073). Conclusion The DA was perceived as acceptable and useful for most women. The DA effectiveness is currently being evaluated using a randomized controlled trial. PMID:21223468
Privacy and Biobanking in China: A Case of Policy in Transition.
Chen, Haidan; Chan, Benny; Joly, Yann
2015-01-01
Disease-based biobanks have operated in hospitals and research institutes in China for decades, and China has recently embarked on a plan to establish further biobank networks with the aim of promoting data sharing among the existing biobanks. Although the Chinese Constitution has only recently begun to recognize individual privacy as a distinct and independent constitutional right, biobanking in China has been loosely regulated under a patchwork of sometimes overlapping laws (such as the Interim Measures for the Administration of Human Genetic Resources) and regulatory instruments, as well as and the policies of individual biobanks and networks of biobanks (such as the Shanghai Biobank Network Guidelines). A Draft Ordinance on Human Genetics Resources is currently being developed that will deal in more detail than previous laws with issues such as management measures, legal liability, and punishment for violations. International data sharing will be tightly regulated under this new law, and individual biobanks' policies such as the Shanghai Guidelines may choose to regulate such sharing even more. In contrast with national regulatory instruments, the Shanghai Guidelines also contain detailed de-identification policies, and explicitly endorse broad consent. © 2015 American Society of Law, Medicine & Ethics, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnish, J.; Chen, S. Y.; Kamboj, S.
1999-07-22
Within the next few decades, several hundred thousand tons of metal and several million cubic meters of concrete are expected to be removed from nuclear facilities across the US Department of Energy (DOE) complex as a result of decontamination and decommissioning (D&D) activities. These materials, together with large quantities of tools, equipment, and other items that are commonly recovered from site cleanup or D&D activities, constitute non-real properties that warrant consideration for release from regulatory control for reuse or recycle, as permitted and practiced under current DOE policy. The provisions for implementing this policy are contained in the Draft Handbookmore » for Controlling Release for Reuse or Recycle of Non-Real Property Containing Residual Radioactive Material published by DOE in 1997 and distributed to DOE Field Offices for interim use and implementation. This manual describes a computer management tool, P2Pro(RSM), that implements the first 5 steps of the 10-step process stipulated by the Handbook. P2Pro(RSM) combines an easy-to-use Windows interface with a comprehensive database to facilitate the development of authorized release limits for non-real property.« less
New anti-rebate legislation in South Korea.
Yu, Su-Yeon; Yang, Bong-Min; Kim, Jin-Hyun
2013-08-01
The South Korean Government recently announced a reform in the drug anti-rebate law, with the purpose of eradicating pervasive, unethical, and illegal rebate practices in pharmaceutical marketing. The main objective of this reform is to have the ability to bring criminal charges against doctors and pharmacists for receiving illegal kickbacks from drug companies. Previously, provision of illegal kickbacks by drug companies led to criminal punishment of the drug companies alone, leaving doctors and pharmacists unpunished as the recipients. With the introduction of the "Dual Punishment System (DPS)" reform, criminal punishment for illegal rebates is extended to those receiving illegal kickbacks. Although bitter controversy erupted among stakeholders when the reform was first drafted, a civic group participated in the reform process and effectively influenced the legislative process to a successful end. Some interim outcomes from the DPS in terms of bringing illegal practices to account have already been reported since the policy's implementation in November 2010. The reform background, goals, potential issues, and policy implications are explored in this study with the objective of providing further insight into drug policy for other countries that face similar challenges in the area of drug marketing.
Graiff, Lorenzo; Vigolo, Paolo
2012-04-01
Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.
Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F
2013-05-01
At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.
Publishing interim results of randomised clinical trials in peer-reviewed journals.
Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan
2017-02-01
Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.
Geographic variation in lumbar diskectomy: a protocol for evaluation.
Barron, M; Kazandjian, V A
1992-03-01
In 1989 the Maryland Hospital Association (MHA) began developing a protocol related to lumbar diskectomy, a procedure with widely reported geographic variation in its use. The MHA's Laminectomy Advisory Committee drafted three criteria for performance of lumbar diskectomy and also developed a data-collection instrument with which the eight hospitals participating in a pilot study could abstract the necessary data from medical records. Both individual hospital and aggregate results showed wide variation in compliance with the criteria. These findings suggest research and development activities such as refinement of the data-collection instrument, use of the protocol for bench-marking, further investigation of clinical and other determinants of rate variation, and study of the effect of new diagnostic technology on utilization rates for this procedure.
2016 United Kingdom national guideline on the sexual health care of men who have sex with men.
Clutterbuck, Dan; Asboe, David; Barber, Tristan; Emerson, Carol; Field, Nigel; Gibson, Stuart; Hughes, Gwenda; Jones, Rachael; Murchie, Martin; Nori, Achyuta V; Rayment, Michael; Sullivan, Ann
2018-01-01
This guideline is intended for use in UK Genitourinary medicine clinics and sexual health services but is likely to be of relevance in all sexual health settings, including general practice and Contraception and Sexual Health (CASH) services, where men who have sex with men (MSM) seek sexual health care or where addressing the sexual health needs of MSM may have public health benefits. For the purposes of this document, MSM includes all gay, bisexual and all other males who have sex with other males and both cis and trans men. This document does not provide guidance on the treatment of particular conditions where this is covered in other British Association for Sexual Health and HIV (BASHH) Guidelines but outlines best practice in multiple aspects of the sexual health care of MSM. Where prevention of sexually transmitted infections including HIV can be addressed as an integral part of clinical care, this is consistent with the concept of combination prevention and is included. The document is designed primarily to provide guidance on the direct clinical care of MSM but also makes reference to the design and delivery of services with the aim of supporting clinicians and commissioners in providing effective services. Methodology This document was produced in accordance with the guidance set out in the BASHH CEG's document 'Framework for guideline development and assessment' published in 2010 at http://www.bashh.org/guidelines and with reference to the Agree II instrument. Following the production of the updated framework in April 2015, the GRADE system for assessing evidence was adopted and the draft recommendations were regraded. Search strategy (see also Appendix 1) Ovid Medline 1946 to December 2014, Medline daily update, Embase 1974 to December 2014, Pubmed NeLH Guidelines Database, Cochrane library from 2000 to December 2014. Search language English only. The search for Section 3 was conducted on PubMed to December 2014. Priority was given to peer-reviewed papers published in scientific journals, although for many issues evidence includes conference abstracts listed on the Embase database. In addition, for 'Identification of problematic recreational drug and alcohol use' section and 'Sexual problems and dysfunctions in MSM' section, searches included PsycINFO. Methods Article titles and abstracts were reviewed and if relevant the full text article was obtained. Priority was given to randomised controlled trial and systematic review evidence, and recommendations made and graded on the basis of best available evidence. Piloting and feedback The first draft of the guideline was circulated to the writing group and to a small group of relevant experts, third sector partners and patient representatives who were invited to comment on the whole document and specifically on particular sections. The revised draft was reviewed by the CEG and then reviewed by the BASHH patient/public panel and posted on the BASHH website for public consultation. The final draft was piloted before publication. Guideline update The guidelines will be reviewed and revised in five years' time, 2022.
Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung
2017-01-01
Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.
Hilbink, Mirrian A H W; Ouwens, Marielle M T J; Burgers, Jako S; Kool, Rudolf B
2014-03-19
In the last decade, guideline organizations faced a number of problems, including a lack of standardization in guideline development methods and suboptimal guideline implementation. To contribute to the solution of these problems, we produced a toolbox for guideline development, implementation, revision, and evaluation. All relevant guideline organizations in the Netherlands were approached to prioritize the topics. We sent out a questionnaire and discussed the results at an invitational conference. Based on consensus, twelve topics were selected for the development of new tools. Subsequently, working groups were composed for the development of the tools. After development of the tools, their draft versions were pilot tested in 40 guideline projects. Based on the results of the pilot tests, the tools were refined and their final versions were presented. The vast majority of organizations involved in pilot testing of the tools reported satisfaction with using the tools. Guideline experts involved in pilot testing of the tools proposed a variety of suggestions for the implementation of the tools. The tools are available in Dutch and in English at a web-based platform on guideline development and implementation (http://www.ha-ring.nl). A collaborative approach was used for the development and evaluation of a toolbox for development, implementation, revision, and evaluation of guidelines. This approach yielded a potentially powerful toolbox for improving the quality and implementation of Dutch clinical guidelines. Collaboration between guideline organizations within this project led to stronger linkages, which is useful for enhancing coordination of guideline development and implementation and preventing duplication of efforts. Use of the toolbox could improve quality standards in the Netherlands, and might facilitate the development of high-quality guidelines in other countries as well.
Guidance: Interim Municipal Settlement Policy
Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.
Rajasekhar, Anita; Lottenberg, Lawrence; Lottenberg, Richard; Feezor, Robert J; Armen, Scott B; Liu, Huazhi; Efron, Philip A; Crowther, Mark; Ang, Darwin
2011-08-01
Placement of prophylactic inferior vena cava filters (pIVCFs) for the prevention of pulmonary embolism (PE) in high-risk trauma patients (HRTPs) are widely practiced despite the lack of Level I data supporting this use. We report the 2-year interim analysis of the Filters in Trauma pilot study. This is a single institution, prospective randomized controlled pilot feasibility study in a Level I trauma center. HRTPs were identified for pIVCF placement by the Eastern Association for the Surgery of Trauma guidelines. From November 2008 to November 2010, HRTPs were enrolled and randomized to either pIVCF or no pIVCF. All patients received pharmacologic prophylaxis when safe. Primary outcomes included feasibility objectives and secondary outcomes were incidence of PE, deep vein thrombosis (DVT), and death. Thirty-four of 38 enrolled patients were eligible for analysis. The baseline sociodemographic characteristics were balanced between the both groups. Results of the feasibility objectives included: time from admission to enrollment (mean, 47.4 hours ± 22.0 hours), time from enrollment to randomization (mean, 4.8 hours ± 9.1 hours), time from randomization to IVCF placement (mean, 16.9 hours ± 9.2 hours), adherence to weekly compression ultrasound within first month (IVCF group = 44.4%; non-IVCF group = 62.5%), and 1-month clinical follow-up (IVCF group = 83.3%; non-IVCF group = 100%). At 6-month follow-up, one PE in the nonfilter group and one DVT in the filter group had occurred. One non-PE-related death occurred in the filter group. Barriers to enrollment included inability to obtain informed consent due to patient refusal or no next of kin identified and delayed notification of eligibility status. Our pilot study demonstrates for the first time that a randomized controlled trial evaluating the efficacy of pIVCFs in trauma patients is feasible. This pilot data will be used to inform the design of a multicenter randomized controlled trial to determine the incidence of PE and DVT in HRTPs receiving pIVCFs versus no pIVCF.
Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.
Dallas, Michael J
2008-01-01
Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
76 FR 4369 - Special Law Enforcement Commissions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
Durham, Jo; Phengsavanh, Alongkone; Sychareun, Vanphanom; Hose, Isaac; Vongxay, Viengnakhone; Xaysomphou, Douangphachanh; Rickart, Keith
2018-01-01
The purpose of this study was to gather the necessary data to support the design and implementation of a pilot program for women who are unable to deliver in a healthcare facility in the Lao People's Democratic Republic (PDR), by using community distribution of misoprostol to prevent postpartum hemorrhage (PPH). The study builds on an earlier research that demonstrated both support and need for community-based distribution of misoprostol in Lao PDR. This qualitative study identified acceptability of misoprostol and healthcare system needs at varying levels to effectively distribute misoprostol to women with limited access to facility-based birthing. Interviews (n=25) were undertaken with stakeholders at the central, provincial, and district levels and with community members in five rural communities in Oudomxay, a province with high rates of maternal mortality. Focus group discussions (n=5) were undertaken in each community. Respondents agreed that PPH was the major cause of preventable maternal mortality with community distribution of misoprostol an acceptable and feasible interim preventative solution. Strong leadership, training, and community mobilization were identified as critical success factors. While several participants preferred midwives to distribute misoprostol, given the limited availability of midwives, there was a general agreement that village health workers or other lower level workers could safely administer misoprostol. Many key stakeholders, including women themselves, considered that these community-level staff may be able to provide misoprostol to women for self-administration, as long as appropriate education on its use was included. The collected data also helped identify appropriate educational messages and key indicators for monitoring and evaluation for a pilot program. The findings strengthen the case for a pilot program of community distribution of misoprostol to prevent PPH in remote communities where women have limited access to a health facility and highlight the key areas of consideration in developing such a program.
Durham, Jo; Phengsavanh, Alongkone; Sychareun, Vanphanom; Hose, Isaac; Vongxay, Viengnakhone; Xaysomphou, Douangphachanh; Rickart, Keith
2018-01-01
Purpose The purpose of this study was to gather the necessary data to support the design and implementation of a pilot program for women who are unable to deliver in a healthcare facility in the Lao People’s Democratic Republic (PDR), by using community distribution of misoprostol to prevent postpartum hemorrhage (PPH). The study builds on an earlier research that demonstrated both support and need for community-based distribution of misoprostol in Lao PDR. Methods This qualitative study identified acceptability of misoprostol and healthcare system needs at varying levels to effectively distribute misoprostol to women with limited access to facility-based birthing. Interviews (n=25) were undertaken with stakeholders at the central, provincial, and district levels and with community members in five rural communities in Oudomxay, a province with high rates of maternal mortality. Focus group discussions (n=5) were undertaken in each community. Results Respondents agreed that PPH was the major cause of preventable maternal mortality with community distribution of misoprostol an acceptable and feasible interim preventative solution. Strong leadership, training, and community mobilization were identified as critical success factors. While several participants preferred midwives to distribute misoprostol, given the limited availability of midwives, there was a general agreement that village health workers or other lower level workers could safely administer misoprostol. Many key stakeholders, including women themselves, considered that these community-level staff may be able to provide misoprostol to women for self-administration, as long as appropriate education on its use was included. The collected data also helped identify appropriate educational messages and key indicators for monitoring and evaluation for a pilot program. Conclusion The findings strengthen the case for a pilot program of community distribution of misoprostol to prevent PPH in remote communities where women have limited access to a health facility and highlight the key areas of consideration in developing such a program. PMID:29785142
2009-01-01
Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.
46 CFR 97.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 196.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 78.50-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...
46 CFR 97.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 97.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 196.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 97.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 196.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 78.50-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...
46 CFR 78.50-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...
46 CFR 78.50-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...
46 CFR 97.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 196.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 78.50-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...
46 CFR 196.40-10 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
42 CFR 417.574 - Interim settlement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
10 CFR 590.403 - Emergency interim orders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...
EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.
EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.
49 CFR 37.193 - Interim service requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...
76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...
EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn
2010-06-01
This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.
46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...
Smoothing Motion Estimates for Radar Motion Compensation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doerry, Armin W.
2017-07-01
Simple motion models for complex motion environments are often not adequate for keeping radar data coherent. Eve n perfect motion samples appli ed to imperfect models may lead to interim calculations e xhibiting errors that lead to degraded processing results. Herein we discuss a specific i ssue involving calculating motion for groups of pulses, with measurements only available at pulse-group boundaries. - 4 - Acknowledgements This report was funded by General A tomics Aeronautical Systems, Inc. (GA-ASI) Mission Systems under Cooperative Re search and Development Agre ement (CRADA) SC08/01749 between Sandia National Laboratories and GA-ASI. General Atomics Aeronautical Systems, Inc.more » (GA-ASI), an affilia te of privately-held General Atomics, is a leading manufacturer of Remotely Piloted Aircraft (RPA) systems, radars, and electro-optic and rel ated mission systems, includin g the Predator(r)/Gray Eagle(r)-series and Lynx(r) Multi-mode Radar.« less
Weiner, Saul J; Schwartz, Alan; Yudkowsky, Rachel; Schiff, Gordon D; Weaver, Frances M; Goldberg, Julie; Weiss, Kevin B
2007-01-01
Clinical decision making requires 2 distinct cognitive skills: the ability to classify patients' conditions into diagnostic and management categories that permit the application of research evidence and the ability to individualize or-more specifically-to contextualize care for patients whose circumstances and needs require variation from the standard approach to care. The purpose of this study was to develop and test a methodology for measuring physicians' performance at contextualizing care and compare it to their performance at planning biomedically appropriate care. First, the authors drafted 3 cases, each with 4 variations, 3 of which are embedded with biomedical and/or contextual information that is essential to planning care. Once the cases were validated as instruments for assessing physician performance, 54 internal medicine residents were then presented with opportunities to make these preidentified biomedical or contextual errors, and data were collected on information elicitation and error making. The case validation process was successful in that, in the final iteration, the physicians who received the contextual variant of cases proposed an alternate plan of care to those who received the baseline variant 100% of the time. The subsequent piloting of these validated cases unmasked previously unmeasured differences in physician performance at contextualizing care. The findings, which reflect the performance characteristics of the study population, are presented. This pilot study demonstrates a methodology for measuring physician performance at contextualizing care and illustrates the contribution of such information to an overall assessment of physician practice.
78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...
78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Geohydrologic data have been collected in the Los Medanos area at the US Department of Energy`s proposed Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico since 1975 as part of a study evaluating the feasibility of storing defense-associated nuclear wastes within the bedded salt of the Salado Formation of Permian age. Drilling and hydrologic testing have identified three principal water-bearing zones above the Salado Formation and one below that could potentially transport wastes to the biosphere if the proposed facility were breached. The zones above the Salado are the contact between the Rustler and Salado Formations and themore » Culebra and Magenta Dolomite Members of the Rustler Formation of Permian age. The zone below the Salado Formation consists of channel sandstones in the Bell Canyon Formation of the Permian Delaware Mountain Group. Determinations of hydraulic gradients, directions of flow, and hydraulic properties were hindered because of the negligible permeability of the water-bearing zones. Special techniques in drilling, well completion, and hydraulic testing have been developed to determine the hydrologic characteristics of these water-producing zones.« less
Drafting Fundamentals. Drafting Module 1. Instructor's Guide.
ERIC Educational Resources Information Center
Missouri Univ., Columbia. Instructional Materials Lab.
This Missouri Vocational Instruction Management System instructor's drafting guide has been keyed to the drafting competency profile developed by state industry and education professionals. The guide contains a cross-reference table of instructional materials. Ten units cover drafting fundamentals: (1) introduction to drafting; (2) general safety;…
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...
Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, J.
2002-06-18
The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.
ERIC Educational Resources Information Center
Nugent, Patricia A.
2011-01-01
The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…
Presidential Transition: The Experience of Two Community College Interim Presidents
ERIC Educational Resources Information Center
Thompson, Matthew D.
2010-01-01
The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...
17 CFR 210.10-01 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...
75 FR 66553 - Truth in Lending
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...
Staff Reactions to Interim Leadership in a Student Affairs Organization
ERIC Educational Resources Information Center
Jones, Robin D.
2011-01-01
Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…
Faculty and Student Views of the Interim Term
ERIC Educational Resources Information Center
Centra, John A.; Sobol, Marion G.
1974-01-01
Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)
12 CFR 541.18 - Interim Federal savings association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
Into the Sunset: Reflections of an Interim Administrator.
ERIC Educational Resources Information Center
Marlowe, John
2000-01-01
One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)
2015-09-30
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on
Functional Drafting, Drafting--Intermediate: 9255.02.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
The course consists of six instructional blocks totaling 135 clock hours: (1) functional drafting, (2) threads and fasteners, (3) pictorial drawings, (4) introduction to electronic drafting, (5) introduction to piping drafting, and (6) Quinmester posttest. Mastery of skills indicated in Drafting-Basic--9255.01 is a prerequisite. In the functional…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
...] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery..., announce the availability of the draft environmental impact statement and the draft Oncor Electric Delivery... Oncor Electric Delivery Company, LLC (Applicant; Oncor), and (2) That the Applicant has developed a...
A Computer Model of Drafting Effects on Collective Behavior in Elite 10,000-m Runners.
Trenchard, Hugh; Renfree, Andrew; Peters, Derek M
2017-03-01
Drafting in cycling influences collective behavior of pelotons. Although evidence for collective behavior in competitive running events exists, it is not clear if this results from energetic savings conferred by drafting. This study modeled the effects of drafting on behavior in elite 10,000-m runners. Using performance data from a men's elite 10,000-m track running event, computer simulations were constructed using Netlogo 5.1 to test the effects of 3 different drafting quantities on collective behavior: no drafting, drafting to 3 m behind with up to ~8% energy savings (a realistic running draft), and drafting up to 3 m behind with up to 38% energy savings (a realistic cycling draft). Three measures of collective behavior were analyzed in each condition: mean speed, mean group stretch (distance between first- and last-placed runner), and runner-convergence ratio (RCR), which represents the degree of drafting benefit obtained by the follower in a pair of coupled runners. Mean speeds were 6.32 ± 0.28, 5.57 ± 0.18, and 5.51 ± 0.13 m/s in the cycling-draft, runner-draft, and no-draft conditions, respectively (all P < .001). RCR was lower in the cycling-draft condition but did not differ between the other 2. Mean stretch did not differ between conditions. Collective behaviors observed in running events cannot be fully explained through energetic savings conferred by realistic drafting benefits. They may therefore result from other, possibly psychological, processes. The benefits or otherwise of engaging in such behavior are as yet unclear.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...
33 CFR 401.29 - Maximum draft.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Maximum draft. 401.29 Section 401... TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.29 Maximum draft. (a) The draft...) The draft of a vessel shall not, in any case, exceed 79.2 dm or the maximum permissible draft...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...
33 CFR 401.29 - Maximum draft.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Maximum draft. 401.29 Section 401... TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.29 Maximum draft. (a) The draft...) The draft of a vessel shall not, in any case, exceed 79.2 dm or the maximum permissible draft...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the... alternative) seeks to allocate limited resources among competing human interests, land uses, and conservation...
33 CFR 401.29 - Maximum draft.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Maximum draft. 401.29 Section 401... TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.29 Maximum draft. (a) The draft...) The draft of a vessel shall not, in any case, exceed 79.2 dm or the maximum permissible draft...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-27
...] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery... availability of the draft environmental impact statement (DEIS) and the draft Oncor Electric Delivery Company... announced that Oncor Electric Delivery Company, LLC, has applied under section 10(a)(1)(B) of the Endangered...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...
Do Interim Assessments Reduce the Race and SES Achievement Gaps?
ERIC Educational Resources Information Center
Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie
2017-01-01
The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-06
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...
Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51
ERIC Educational Resources Information Center
Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew
2009-01-01
The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...
33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?
Code of Federal Regulations, 2010 CFR
2010-07-01
... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...
18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...
42 CFR 417.572 - Budget and enrollment forecast and interim reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
...: Comments should be addressed to Interim Director, Division of Human Resource Management and Chief Human.... Judith S. Sunley, Interim Director, Division of Human Resource Management and Chief Human Capital Officer..., Interim Director, Division of Human Resource Management and Chief Human Capital Officer. [FR Doc. 2010...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
From ideas to studies: how to get ideas and sharpen them into research questions.
Vandenbroucke, Jan P; Pearce, Neil
2018-01-01
Where do new research questions come from? This is at best only partially taught in courses or textbooks about clinical or epidemiological research. Methods are taught under the assumption that a researcher already knows the research question and knows which methods will fit that question. Similarly, the real complexity of the thought processes that lead to a scientific undertaking is almost never described in published papers. In this paper, we first discuss how to get an idea that is worth researching. We describe sources of new ideas and how to foster a creative attitude by "cultivating your thoughts". Only a few of these ideas will make it into a study. Next, we describe how to sharpen and focus a research question so that a study becomes feasible and a valid test of the underlying idea. To do this, the idea needs to be "pruned". Pruning a research question means cutting away anything that is unnecessary, so that only the essence remains. This includes determining both the latent and the stated objectives, specific pruning questions, and the use of specific schemes to structure reasoning. After this, the following steps include preparation of a brief protocol, conduct of a pilot study, and writing a draft of the paper including draft tables. Then you are ready to carry out your research.
From ideas to studies: how to get ideas and sharpen them into research questions
Vandenbroucke, Jan P; Pearce, Neil
2018-01-01
Where do new research questions come from? This is at best only partially taught in courses or textbooks about clinical or epidemiological research. Methods are taught under the assumption that a researcher already knows the research question and knows which methods will fit that question. Similarly, the real complexity of the thought processes that lead to a scientific undertaking is almost never described in published papers. In this paper, we first discuss how to get an idea that is worth researching. We describe sources of new ideas and how to foster a creative attitude by “cultivating your thoughts”. Only a few of these ideas will make it into a study. Next, we describe how to sharpen and focus a research question so that a study becomes feasible and a valid test of the underlying idea. To do this, the idea needs to be “pruned”. Pruning a research question means cutting away anything that is unnecessary, so that only the essence remains. This includes determining both the latent and the stated objectives, specific pruning questions, and the use of specific schemes to structure reasoning. After this, the following steps include preparation of a brief protocol, conduct of a pilot study, and writing a draft of the paper including draft tables. Then you are ready to carry out your research. PMID:29563838
Richter, D L; Greaney, M L; McKeown, R E; Cornell, C E; Littleton, M A; Pulley, L; Groff, J Y; Byrd, T L; Herman, C J
2001-01-01
The ENDOW study is a multisite, community-based project designed to improve decision-making and patient-physician communication skills for midlife African-American, white, and Hispanic women facing decisions about hysterectomy. Based on results of initial focus groups, a patient education video was developed in English and Spanish to serve as the centerpiece of various interventions. The video uses community women to model appropriate decision-making and patient-physician communication skills. Women in the target populations rated the video as useful to very useful and would recommend it to others. The use of theory-driven approaches and pilot testing of draft products resulted in the production of a well-accepted, useful video suitable for diverse populations in intervention sites in several states.
A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient
Bettie, Nirmal Famila
2017-01-01
Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report. PMID:29284985
A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.
Bettie, Nirmal Famila
2017-11-01
Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.
Automatic draft reading based on image processing
NASA Astrophysics Data System (ADS)
Tsujii, Takahiro; Yoshida, Hiromi; Iiguni, Youji
2016-10-01
In marine transportation, a draft survey is a means to determine the quantity of bulk cargo. Automatic draft reading based on computer image processing has been proposed. However, the conventional draft mark segmentation may fail when the video sequence has many other regions than draft marks and a hull, and the estimated waterline is inherently higher than the true one. To solve these problems, we propose an automatic draft reading method that uses morphological operations to detect draft marks and estimate the waterline for every frame with Canny edge detection and a robust estimation. Moreover, we emulate surveyors' draft reading process for getting the understanding of a shipper and a receiver. In an experiment in a towing tank, the draft reading error of the proposed method was <1 cm, showing the advantage of the proposed method. It is also shown that accurate draft reading has been achieved in a real-world scene.
Drafting: Current Trends and Future Practices
ERIC Educational Resources Information Center
Jensen, C.
1976-01-01
Various research findings are reported on drafting trends which the author feels should be incorporated into teaching drafting: (1) true position and geometric tolerancing, (2) decimal and metric dimensioning, (3) functional drafting, (4) automated drafting, and (5) drawing reproductions. (BP)
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which is intended for use by community and junior colleges throughout Mississippi, contains curriculum frameworks for the two course sequences of the state's postsecondary-level drafting and design technology program: architectural drafting technology and drafting and design technology. Presented first are a program description and…
50 CFR 660.720 - Interim protection for sea turtles.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 50 Wildlife and Fisheries 13 2012-10-01 2012-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...
50 CFR 660.720 - Interim protection for sea turtles.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 13 2013-10-01 2013-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...
50 CFR 660.720 - Interim protection for sea turtles.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...
50 CFR 660.720 - Interim protection for sea turtles.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 13 2014-10-01 2014-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...
49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities operating over-the-road buses, in addition to compliance with other applicable provisions of this part...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
... assessable professional reported or required to be reported by a municipal advisor to the MSRB on Form A-11... Assessment and Form A-11- Interim. For purposes of the interim assessment, an assessable professional of a...-Interim as an assessable professional any associated person (i) Who otherwise qualifies as an assessable...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-15
... public comments for a planned Environmental Assessment. The Corps is directed to conduct a study of.... The study is structured as a series of interim reports. Interim Report IIIa, limited to the impacts of.... Comments are requested to assist in determining the level of analysis and impacts to be considered for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-28
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0534; FRL-9900-36-Region 9.... Environmental Protection Agency (EPA). ACTION: Interim final rule. SUMMARY: EPA is making an interim [email protected] . Mail or deliver: Frances Wicher (AIR-2), U.S. Environmental Protection Agency Region 9...
Evaluation of ERA-Interim precipitation data in complex terrain
NASA Astrophysics Data System (ADS)
Gao, Lu; Bernhardt, Matthias; Schulz, Karsten
2013-04-01
Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced overestimate in the southern flank of Alps. The poor topographical and flow related characteristic representation of ERA-Interim model is possibly responsible for the bias. Particularly, the mountain block effect of moisture is weak captured. The comparison demonstrates that ERA-Interim precipitation intensity needs bias correction for further alpine climate studies, although it reasonably captures precipitation frequency. This critical evaluation not only diagnosed the data quality of ERA-Interim, but also provided the evidence for reanalysis products downscaling and bias correction in complex terrain.
In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.
Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang
2016-05-01
The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (P<.001). At the facial margin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (P<.001). However, the mean percentage dye penetration was significantly correlated with the vertical and horizontal marginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (P<.01 in each instance). A significantly smaller vertical marginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns; however, this difference was not observed for the horizontal component. The percentage dye penetration was correlated with vertical and horizontal discrepancies at the facial surface for the Jet interim crowns and with horizontal discrepancies at the lingual surface for the Caulk interim crowns. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Adams, Hugo J A; Kwee, Thomas C
2016-10-01
This study aimed to systematically review and meta-analyze the prognostic value of interim (18)F-fluoro-2-deoxy-d-glucose positron emission tomography (FDG-PET) in diffuse large B-cell lymphoma (DLBCL) patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). MEDLINE and EMBASE were systematically searched for suitable studies. Included studies were methodologically appraised, and results were summarized both descriptively and meta-analytically. Nine studies, comprising a total of 996 R-CHOP-treated DLBCL patients, were included. Overall, studies were of moderate methodological quality. The area under the summary receiver operating curve (AUC) of interim FDG-PET in predicting treatment failure and death were 0.651 and 0.817, respectively. There was no heterogeneity in diagnostic odds ratios across available studies (I(2)=0.0%). At multivariable analysis, 2 studies reported interim FDG-PET to have independent prognostic value in addition to the International Prognostic Index (IPI) in predicting treatment failure, whereas 3 studies reported that this was not the case. One study reported interim FDG-PET to have independent prognostic value in addition to the IPI in predicting death, whereas 2 studies reported that this was not the case. In conclusion, interim FDG-PET in R-CHOP-treated DLBCL has some correlation with outcome, but its prognostic value is homogeneously suboptimal across studies and it has not consistently proven to surpass the prognostic potential of the IPI. Moreover, there is a lack of studies that compared interim FDG-PET to the recently developed and superior National Comprehensive Cancer Network-IPI. Therefore, at present there is no scientific base to support the clinical use of interim FDG-PET in R-CHOP-treated DLBCL. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Walter, S D; Han, H; Briel, M; Guyatt, G H
2017-04-30
In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.
NASA Astrophysics Data System (ADS)
Ahmed, F.; Dousa, J.; Hunegnaw, A.; Teferle, F. N.; Bingley, R.
2017-12-01
Integrated water vapor (IWV) derived from climate reanalysis models, such as the European Centre for Medium-range Weather Forecasts (ECMWF) ReAnalysis-Interim (ERA-Interim), is widely used in many atmospheric applications. Therefore, it is of interest to assess the quality of this reanalysis product using available observations. Observations from Global Navigation Satellite Systems (GNSS) are, as of now, available for a period of over 2 decades and their global availability makes it possible to validate the IWV obtained from climate reanalysis models in different geographical and climatic regions. In this study, primarily, three 5-year long homogeneously reprocessed GNSS-derived IWV datasets containing over 400 globally distributed ground-based GNSS stations have been used to validate the IWV estimates obtained from the ERA-Interim climate reanalysis model in 25 different climate zones. The IWV from ERA-Interim has been obtained by vertically integrating the specific humidity at all model levels above the locations of GNSS stations. It has been studied how the difference between the ERA-Interim IWV and the GNSS-derived IWV varies with respect to the different climate zones as well as with respect to the difference in the model orography and latitude. The results show a dependence of the ability of ERA-Interim to model the IWV on difference in climate types and latitude. This dependence, however, is dictated by the concentration of water vapor in different climate zones and at different latitudes. Furthermore, as a secondary focus of this study, the weighted mean atmospheric temperature (Tm) obtained from ERA-Interim has been compared to its equivalent obtained using two widely used approximations globally.
2008-07-10
The Drug Enforcement Administration (DEA) is finalizing, without change, the Interim Rule with Request for Comment published in the Federal Register on July 25, 2007 (72 FR 40738). The Interim Rule removed the Controlled Substances Act (CSA) exemptions for chemical mixtures containing ephedrine and/or pseudoephedrine with concentration limits at or below five percent. Upon the effective date of the Interim Rule, all ephedrine and pseudoephedrine chemical mixtures, regardless of concentration and form, became subject to the regulatory provisions of the CSA. DEA regulated the importation, exportation, manufacture, and distribution of these chemical mixtures by requiring persons who handle these chemical mixtures to register with DEA, maintain certain records common to business practice, and file certain reports, regarding these chemical mixtures. No comments to the Interim Rule were received. This Final Rule finalizes the Interim Rule without change.
Woods, Carl T; Veale, James P; Collier, Neil; Robertson, Sam
2017-02-01
This study investigated the extent to which position in the Australian Football League (AFL) national draft is associated with individual game performance metrics. Physical/technical skill performance metrics were collated from all participants in the 2014 national under 18 (U18) championships (18 games) drafted into the AFL (n = 65; 17.8 ± 0.5 y); 232 observations. Players were subdivided into draft position (ranked 1-65) and then draft round (1-4). Here, earlier draft selection (i.e., closer to 1) reflects a more desirable player. Microtechnology and a commercial provider facilitated the quantification of individual game performance metrics (n = 16). Linear mixed models were fitted to data, modelling the extent to which draft position was associated with these metrics. Draft position in the first/second round was negatively associated with "contested possessions" and "contested marks", respectively. Physical performance metrics were positively associated with draft position in these rounds. Correlations weakened for the third/fourth rounds. Contested possessions/marks were associated with an earlier draft selection. Physical performance metrics were associated with a later draft selection. Recruiters change the type of U18 player they draft as the selection pool reduces. juniors with contested skill appear prioritised.
Ema, Makoto; Fukui, Yoshihiro; Aoyama, Hiroaki; Fujiwara, Michio; Fuji, Junichiro; Inouye, Minoru; Iwase, Takayuki; Kihara, Takahide; Oi, Akihide; Otani, Hiroki; Shinomiya, Mitsuhiro; Sugioka, Kozo; Yamano, Tsunekazu; Yamashita, Keisuke H; Tanimura, Takashi
2007-06-01
In October 2006, a new revision of the draft guideline (OECD Guideline for the Testing of Chemicals, Proposal for a New Guideline 426. Developmental Neurotoxicity Study) and Draft Document of the Retrospective Performance Assessment (RPA) of the Draft Test Guideline 426 on Developmental Neurotoxicity were distributed following incorporation of the results of the Expert Consultation Meeting in Tokyo on May 24-26, 2005. The draft guideline consists of 50 paragraphs and an appendix with 102 references; and the draft RPA consists of 37 paragraphs with 109 references. National coordinators were requested to arrange for national expert reviews of these draft documents in their member countries. Members of the Developmental Neurotoxicology (DNT) Committee of the Japanese Teratology Society (JTS) reviewed, discussed, and commented on the draft Test Guideline Proposal. The DNT Committee of the JTS also commented on the draft document of the RPA. These comments were sent to the OECD Secretariat. The DNT Committee of the JTS expects the comments to be useful for the finalization of these draft documents.
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false Prospective use of rights-of-way for interim trail... Governing Notice, Applications, Financial Assistance, Acquisition for Public Use, and Trail Use § 1152.29 Prospective use of rights-of-way for interim trail use and rail banking. (a) If any state, political...
Temps at the Top: Factors Related to the Appointment of Interim Community College Presidents
ERIC Educational Resources Information Center
Goff, Susan L.
2012-01-01
The appointment of interim community college presidents, the topic of this study, is a little understood phenomenon. A growing shortage of community college presidents coupled with a lack of replacements suggests the appointment of interims will continue well into the future. This study, with a purpose of looking at the factors related to the…
2008-07-17
OIG is adopting in final form, without change, an interim final rule published on March 26, 2008 (73 FR 15937). We received no comments to the interim final rule. The interim final rule revised the process for advisory opinion requestors to submit payments for advisory opinion costs.
ERIC Educational Resources Information Center
Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew
2009-01-01
The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... DEPARTMENT OF COMMERCE Patent and Trademark Office [Docket No. PTO-P-2011-0001] Grant of Interim... Office, Commerce. ACTION: Notice of interim patent term extension. SUMMARY: The United States Patent and... States Patent and Trademark Office. [FR Doc. 2011-2088 Filed 1-31-11; 8:45 am] BILLING CODE 3510-16-P ...
Interim Testing, Socio-Economic Status, and the Odds of Passing Grade 8 State Tests in New Jersey
ERIC Educational Resources Information Center
Babo, Gerard; Tienken, Christopher H.; Gencarelli, Maria A.
2014-01-01
A review of the literature pertaining to the effect and influence of commercially-prepared interim assessments in mathematics and language arts literacy reveals a lack of quantitative data to determine the value of these products for school reform. This study examined the ability of commercially-prepared interim pretest and posttest assessments in…
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
...-indicator of the Capital Fund indicator to all PHAs for the Capital Fund Indicator under the PHAS interim... transition to the scoring system implemented by the PHAS interim rule, especially as relates to the indicator that assesses occupancy rate. The 5 points for the occupancy sub-indicator will be awarded for fiscal...
Lin, Wei-Shao; Harris, Bryan T; Pellerito, John; Morton, Dean
2018-04-30
This report describes a proof of concept for fabricating an interim complete removable dental prosthesis with a digital light processing 3-dimensional (3D) printer. Although an in-office 3D printer can reduce the overall production cost for an interim complete removable dental prosthesis, the process has not been validated with clinical studies. This report provided a preliminary proof of concept in developing a digital workflow for the in-office additively manufactured interim complete removable dental prosthesis. Copyright © 2018 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Kremmling Field... Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM) has prepared a Draft Resource... alternatives for future [[Page 57760
2016-07-29
This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.
Computer Assisted Drafting (CNC) Drawings. Drafting Module 6. Instructor's Guide.
ERIC Educational Resources Information Center
Missouri Univ., Columbia. Instructional Materials Lab.
This Missouri Vocational Instruction Management System instructor's drafting guide has been keyed to the drafting competency profile developed by state industry and education professionals. This unit contains information on computer-assisted drafting drawings. The guide contains a cross-reference table of instructional materials and 20 worksheets.…
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Draft system. 229.61 Section 229.61 Transportation... TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Draft System § 229.61 Draft system. (a) A... absorbed by friction devices or draft gears that exceeds one-half inches. (5) A broken or cracked coupler...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
49 CFR 230.92 - Draw gear and draft systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Draw gear and draft systems. 230.92 Section 230.92 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Tenders Draw Gear and Draft Systems § 230.92 Draw gear and draft systems. Couplers, draft gear and...
49 CFR 230.92 - Draw gear and draft systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Draw gear and draft systems. 230.92 Section 230.92 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Tenders Draw Gear and Draft Systems § 230.92 Draw gear and draft systems. Couplers, draft gear and...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Draft system. 229.61 Section 229.61 Transportation... TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Draft System § 229.61 Draft system. (a) A... absorbed by friction devices or draft gears that exceeds one-half inches. (5) A broken or cracked coupler...
49 CFR 230.92 - Draw gear and draft systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Draw gear and draft systems. 230.92 Section 230.92 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Tenders Draw Gear and Draft Systems § 230.92 Draw gear and draft systems. Couplers, draft gear and...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
49 CFR 230.92 - Draw gear and draft systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Draw gear and draft systems. 230.92 Section 230.92 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Tenders Draw Gear and Draft Systems § 230.92 Draw gear and draft systems. Couplers, draft gear and...
49 CFR 230.92 - Draw gear and draft systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Draw gear and draft systems. 230.92 Section 230.92 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Tenders Draw Gear and Draft Systems § 230.92 Draw gear and draft systems. Couplers, draft gear and...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Draft system. 229.61 Section 229.61 Transportation... TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Draft System § 229.61 Draft system. (a) A... absorbed by friction devices or draft gears that exceeds one-half inches. (5) A broken or cracked coupler...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-03
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Resource Management Plan/General Plan Draft... Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of... California Department of Parks and Recreation was given the responsibility to plan, design, construct...
IRIS Toxicological Review of Ammonia (Revised External Review Draft)
In August 2013, EPA submitted a revised draft IRIS assessment of ammonia to the agency's Science Advisory Board (SAB) and posted this draft on the IRIS website. EPA had previously released a draft of the assessment for public comment, held a public meeting about the draft, and ...
CURRENT PRACTICES OBSERVED IN DESIGN AND DRAFTING OCCUPATIONS.
ERIC Educational Resources Information Center
SQUIRES, CARL E.
DATA WHICH HAD SIGNIFICANCE FOR DESIGN AND DRAFTING CURRICULUMS WERE COLLECTED BY DIRECT OBSERVATION OF 21 DESIGN AND DRAFTING FACTORS WITHIN 16 SELECTED INDUSTRIAL COMPANIES EMPLOYING 869 DESIGNERS AND DRAFTSMEN. OBSERVATIONS COVERED (1) THE NUMBER OF DESIGN AND DRAFTING EMPLOYEES, (2) THE SYSTEM OF DRAFTING ROOM ORGANIZATION, (3) JOB…
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
Individualised advance care planning in children with life-limiting conditions.
Loeffen, Erik A H; Tissing, Wim J E; Schuiling-Otten, Meggi A; de Kruiff, Chris C; Kremer, Leontien C M; Verhagen, A A Eduard
2018-05-01
In 2013, the Pediatric Association of the Netherlands launched an evidence-based guideline 'Palliative care for children'. To promote implementation in daily practice and hereby improve quality of paediatric palliative care, we aimed to develop a functional individualised paediatric palliative care plan (IPPCP) that covers physical, psychological, spiritual and social functioning, with great emphasis on the guideline's recommendations, advance care planning and patients' and parents' preferences and desires. A Dutch working group (28 individuals) with a strong multidisciplinary character developed a draft IPPCP, which was piloted retrospectively and prospectively. In the pilots we completed, the IPPCPs for patients who were recently diagnosed with a life-threatening or life-limiting condition and evaluated completeness, usability and user-friendliness. The final IPPCP comprised five domains: (1) IPPCP data, (2) basics, (3) social, (4) psychosocial and spiritual and (5) physical care. Each domain covered various components. In both pilots, the IPPCP was considered a comprehensive document that covered all areas of paediatric palliative care and was experienced as an improvement to the present situation. However, the current form was regarded to lack user-friendliness. We propose a set of essential components of a comprehensive IPPCP for paediatric palliative care with extra attention for advance care planning and anticipatory action. Patients' and parents' preferences and desires are included next to the recommendations of the evidence-based guideline 'Palliative care for children'. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
Soekirman; Soekarjo, Damayanti; Martianto, Drajat; Laillou, Arnaud; Moench-Pfanner, Regina
2012-12-01
Despite improved economic conditions, vitamin A deficiency remains a public health problem in Indonesia. This paper aims to describe the development of the Indonesian unbranded cooking oil fortification program and to discuss lessons learned to date and future steps necessary for implementation of mandatory, large-scale oil fortification with vitamin A. An historic overview of the steps involved in developing the Indonesian unbranded cooking oil fortification program is given, followed by a discussion of lessons learned and next steps needed. Indonesia's low-income groups generally consume unbranded vegetable oil, with an average consumption of approximately 25 g/day. Unbranded oil constitutes approximately 70% of the total oil traded in the country. In 2007-10, a pilot project to fortify unbranded vegetable oil was carried out in Makassar, and an effectiveness study found that the project significantly improved the serum retinol concentrations of schoolchildren. In 2010, the pilot was expanded to two provinces (West Java and North Sumatra) involving the biggest two national refineries. In 2011, a draft national standard for fortified oil was developed, which is currently under review by the National Standard Body and is expected to be mandated nationally in 2013 as announced officially by the Government of Indonesia in national and international meetings. Indonesia is a leading world supplier of cooking oil. With stakeholder support, the groundwork has been laid and efforts are moving forward to implement mandatory fortification. This project could encourage Indonesian industry to fortify more edible oils for export, thus expanding their market potential and potentially reducing vitamin A deficiency in the region.
ERIC Educational Resources Information Center
What Works Clearinghouse, 2015
2015-01-01
The study, "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading," examined the effects of using Diagnostic Assessment Tools (DAT) on mathematics and reading outcomes for students in 59 Indiana schools during the 2009-10 academic year. DAT consists of interim assessment tools--Wireless Generation's mCLASS for…
ERIC Educational Resources Information Center
Immekus, Jason C.; Atitya, Ben
2016-01-01
Interim tests are a central component of district-wide assessment systems, yet their technical quality to guide decisions (e.g., instructional) has been repeatedly questioned. In response, the study purpose was to investigate the validity of a series of English Language Arts (ELA) interim assessments in terms of dimensionality and prediction of…
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Managing the Drafting Process: Creating a New Model for the Workplace.
ERIC Educational Resources Information Center
Shwom, Barbara L.; Hirsch, Penny L.
1994-01-01
Discusses the development of a pragmatic model of the writing process in the workplace, focusing on the importance of "drafting" as part of that process. Discusses writers' attitudes about drafting and the structures of the workplace that drafting has to accommodate. Introduces a drafting model and discusses results of using this model…
76 FR 65722 - Notification of Two Public Teleconferences; Clean Air Scientific Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... EPA's Integrated Science Assessment for Lead (First External Review Draft, May 2011) and EPA's draft... Science Assessment for Lead (First External Review Draft, May 2011) should be directed to Dr. Ellen... Integrated Science Assessment for Lead (First External Review Draft, May 2011) and EPA's draft Near-Road NO 2...
46 CFR 151.03-35 - Limiting draft.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Limiting draft. 151.03-35 Section 151.03-35 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Definitions § 151.03-35 Limiting draft. Maximum allowable draft to which a barge may be loaded. Limiting draft is a function of hull type and cargo specific gravity...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 6 2014-07-01 2014-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...
18 CFR 281.212 - Draft tariff and index of entitlements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Draft tariff and index... Rule § 281.212 Draft tariff and index of entitlements. (a) Each interstate pipeline shall prepare draft tariff sheets or sections and a draft index of entitlements in accordance with this subpart. (b) The...
18 CFR 281.212 - Draft tariff and index of entitlements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Draft tariff and index... Rule § 281.212 Draft tariff and index of entitlements. (a) Each interstate pipeline shall prepare draft tariff sheets or sections and a draft index of entitlements in accordance with this subpart. (b) The...
46 CFR 151.03-35 - Limiting draft.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Limiting draft. 151.03-35 Section 151.03-35 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Definitions § 151.03-35 Limiting draft. Maximum allowable draft to which a barge may be loaded. Limiting draft is a function of hull type and cargo specific gravity...
18 CFR 281.212 - Draft tariff and index of entitlements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Draft tariff and index... Rule § 281.212 Draft tariff and index of entitlements. (a) Each interstate pipeline shall prepare draft tariff sheets or sections and a draft index of entitlements in accordance with this subpart. (b) The...
18 CFR 281.212 - Draft tariff and index of entitlements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Draft tariff and index... Rule § 281.212 Draft tariff and index of entitlements. (a) Each interstate pipeline shall prepare draft tariff sheets or sections and a draft index of entitlements in accordance with this subpart. (b) The...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 6 2012-07-01 2012-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...
46 CFR 151.03-35 - Limiting draft.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Limiting draft. 151.03-35 Section 151.03-35 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Definitions § 151.03-35 Limiting draft. Maximum allowable draft to which a barge may be loaded. Limiting draft is a function of hull type and cargo specific gravity...
46 CFR 151.03-35 - Limiting draft.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 5 2011-10-01 2011-10-01 false Limiting draft. 151.03-35 Section 151.03-35 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Definitions § 151.03-35 Limiting draft. Maximum allowable draft to which a barge may be loaded. Limiting draft is a function of hull type and cargo specific gravity...
18 CFR 281.212 - Draft tariff and index of entitlements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Draft tariff and index... Rule § 281.212 Draft tariff and index of entitlements. (a) Each interstate pipeline shall prepare draft tariff sheets or sections and a draft index of entitlements in accordance with this subpart. (b) The...
46 CFR 151.03-35 - Limiting draft.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 5 2014-10-01 2014-10-01 false Limiting draft. 151.03-35 Section 151.03-35 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Definitions § 151.03-35 Limiting draft. Maximum allowable draft to which a barge may be loaded. Limiting draft is a function of hull type and cargo specific gravity...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Draft EIS. 989.19 Section 989.19 National... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.19 Draft EIS. (a) Preliminary draft. The EPF supports the proponent in preparation of a preliminary draft EIS (PDEIS) (40 CFR 1502.9) based on the scope of issues...
46 CFR 167.55-1 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 167.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Special Markings Required § 167.55-1 Draft marks and draft indicating systems. (a... are of uniform height equal to the vertical spacing between consecutive marks. (f) Draft marks must be...
46 CFR 167.55-1 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 167.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Special Markings Required § 167.55-1 Draft marks and draft indicating systems. (a... are of uniform height equal to the vertical spacing between consecutive marks. (f) Draft marks must be...
46 CFR 167.55-1 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 167.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Special Markings Required § 167.55-1 Draft marks and draft indicating systems. (a... are of uniform height equal to the vertical spacing between consecutive marks. (f) Draft marks must be...
46 CFR 167.55-1 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 167.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Special Markings Required § 167.55-1 Draft marks and draft indicating systems. (a... are of uniform height equal to the vertical spacing between consecutive marks. (f) Draft marks must be...
46 CFR 167.55-1 - Draft marks and draft indicating systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 167.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Special Markings Required § 167.55-1 Draft marks and draft indicating systems. (a... are of uniform height equal to the vertical spacing between consecutive marks. (f) Draft marks must be...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-11
... the Panel's draft report on EPA's draft Accounting Framework for Biogenic CO2 Emissions from...'s draft report on EPA's draft Accounting Framework for Biogenic CO2 Emissions from Stationary... Radiation requested SAB review of EPA's draft accounting framework. As noticed in 76 FR 61100-61101, the SAB...
Chen, Jia-Kun; Huang, Rong Fung; Peng, Kuan-Lin
2012-01-01
The effects of draft on the flow and spillage characteristics of wall-mounted and jet-isolated range hoods were investigated. A specially designed draft generator that could supply low-swirl air current was used to provide "cross draft" from three directions, lateral (θ = 0(o)), oblique (θ = 45(o)), and front (θ = 90(o)), with respect to the center point of the range hoods. Flow characteristics of oil mist were inspected through visualization of smoke flows with light scattering (laser light sheet-assisted visualization of smoke flow). The leakage mechanisms, which were closely related to the flow features, were studied by examining both movies and still pictures showing smoke-flow evolution. The sulfur hexafluoride tracer gas concentration detection method was employed to measure the capture indices. The results showed that the lateral draft pushed the pollutants generated under the hood in the opposite direction and induced serious spillage. The oblique draft pushed the pollutants toward both the rear wall and opposite side and induced more serious spillage than did the lateral draft. The frontal draft forced the pollutants to bifurcate into streams moving toward the left and the right, and induced the most serious pollutant spillage among the three tested drafts. Pollutant spillage became critically significant as the cross draft velocity was increased to greater than 0.2 m/sec. Spillage of pollutants increased as the velocity of the cross draft was increased. Increasing the suction flow rate of the range hood may increase resistance to the draft, but the benefits were limited at draft velocities greater than 0.2 m/sec. Both range hoods had a similarly low capture index under the influence of the lateral draft. For the oblique and frontal drafts, the jet-isolated range hood demonstrated a higher capture index than did the wall-mounted range hood.
PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY TH
The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revisionmore » includes information on additional feed tanks.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... SAB report, Peer Review of EPA's Draft National-Scale Mercury Risk Assessment (08/04/11) Draft. DATES... SAB draft report entitled Peer Review of EPA's Draft National-Scale Mercury Risk Assessment (08/04/1...)(1)(A) of the Clean Air Act (CAA). EPA developed a draft risk assessment for mercury, entitled...
12 CFR 516.20 - What information must I include in my draft business plan?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 12 Banks and Banking 6 2013-01-01 2012-01-01 true What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...
12 CFR 516.20 - What information must I include in my draft business plan?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 12 Banks and Banking 6 2012-01-01 2012-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...
12 CFR 116.20 - What information must I include in my draft business plan?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 12 Banks and Banking 1 2014-01-01 2014-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...
12 CFR 116.20 - What information must I include in my draft business plan?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 12 Banks and Banking 1 2012-01-01 2012-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...
12 CFR 116.20 - What information must I include in my draft business plan?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 12 Banks and Banking 1 2013-01-01 2013-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...
12 CFR 516.20 - What information must I include in my draft business plan?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 12 Banks and Banking 6 2014-01-01 2012-01-01 true What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...
12 CFR 516.20 - What information must I include in my draft business plan?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 12 Banks and Banking 5 2011-01-01 2011-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...
ERIC Educational Resources Information Center
Ozkan, Aysen; Yildirim, Kemal
2016-01-01
Problem Statement: Drafting course is essential for students in the design disciplines for becoming more organized and for complying with standards in the educational system. Drafting knowledge is crucial, both for comprehension of the issues and for the implementation phase. In any design project, drafting performance and success are as important…
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-02
... Management Plan (EIS/GMP) for Fort Raleigh National Historic Site, North Carolina. The draft describes and... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
....HAG11-0127] Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact... Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Baker... conditions, and changes in resource management practices since the Baker RMP of 1989. The Draft RMP/EIS was...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jenkins-Smith, Hank C.; Silva, Carol L.; Gupta, Kuhika
This report presents the questions and responses to a nationwide survey taken June 2016 to track preferences of US residents concerning the environment, energy, and radioactive waste management. A focus of the 2016 survey is public perceptions on different options for managing spent nuclear fuel, including on-site storage, interim storage, deep boreholes, general purpose geologic repositories, and geologic repositories for only defense-related waste. Highlights of the survey results include the following: (1) public attention to the 2011 accident and subsequent cleanup at the Fukushima nuclear facility continues to influence the perceived balance of risk and benefit for nuclear energy; (2)more » the incident at the Waste Isolation Pilot Plant in 2014 could influence future public support for nuclear waste management; (3) public knowledge about US nuclear waste management policies has remined higher than seen prior to the Fukushima nuclear accident and submittal of the Yucca Mountain application; (6) support for a mined disposal facility is higher than for deep borehole disposal, building one more interim storage facilities, or continued on-site storage of spent nuclear fuel; (7) support for a repository that comingles commercial and defense related waste is higher than for a repository for only defense related waste; (8) the public’s level of trust accorded to the National Academies, university scientists, and local emergency responders is the highest and the level trust accorded to advocacy organizations, public utilities, and local/national press is the lowest; and (9) the public is willing to serve on citizens panels but, in general, will only modestly engage in issues related to radioactive waste management.« less
The utility of Bayesian predictive probabilities for interim monitoring of clinical trials
Connor, Jason T.; Ayers, Gregory D; Alvarez, JoAnn
2014-01-01
Background Bayesian predictive probabilities can be used for interim monitoring of clinical trials to estimate the probability of observing a statistically significant treatment effect if the trial were to continue to its predefined maximum sample size. Purpose We explore settings in which Bayesian predictive probabilities are advantageous for interim monitoring compared to Bayesian posterior probabilities, p-values, conditional power, or group sequential methods. Results For interim analyses that address prediction hypotheses, such as futility monitoring and efficacy monitoring with lagged outcomes, only predictive probabilities properly account for the amount of data remaining to be observed in a clinical trial and have the flexibility to incorporate additional information via auxiliary variables. Limitations Computational burdens limit the feasibility of predictive probabilities in many clinical trial settings. The specification of prior distributions brings additional challenges for regulatory approval. Conclusions The use of Bayesian predictive probabilities enables the choice of logical interim stopping rules that closely align with the clinical decision making process. PMID:24872363
INTERIM -- Starlink Software Environment
NASA Astrophysics Data System (ADS)
Pearce, Dave; Pavelin, Cliff; Lawden, M. D.
Early versions of this paper were based on a number of other papers produced at a very early stage of the Starlink project. They contained a description of a specific implementation of a subroutine library, speculations on the desirable attributes of a software environment, and future development plans. They reflected the experimental nature of the Starlink software environment at that time. Since then, the situation has changed. The implemented subroutine library, INTERIM_DIR:INTERIM.OLB, is now a well established and widely used piece of software. A completely new Starlink software environment (ADAM) has been developed and distributed. Thus the library released in 1980 as `STARLINK' and now called `INTERIM' has reached the end of its development cycle and is now frozen in its current state, apart from bug corrections. This paper has, therefore, been completely rewritten and restructured to reflect the new situation. Its aim is to describe the facilities of the INTERIM subroutine library as clearly and concisely as possible. It avoids speculation, discussion of design decisions, and announcements of future plans.
46 CFR 174.040 - Stability requirements: general.
Code of Federal Regulations, 2011 CFR
2011-10-01
... metacentric height in the upright equilibrium position for the full range of drafts, whether at the operating draft for navigation, towing, or drilling afloat, or at a temporary draft when changing drafts. ...
46 CFR 174.040 - Stability requirements: general.
Code of Federal Regulations, 2014 CFR
2014-10-01
... metacentric height in the upright equilibrium position for the full range of drafts, whether at the operating draft for navigation, towing, or drilling afloat, or at a temporary draft when changing drafts. ...
Seaside, Oregon Tsunami Pilot Study - modernization of FEMA flood hazard maps
,
2006-01-01
FEMA Flood Insurance Rate Map (FIRM) guidelines do not currently exist for conducting and incorporating tsunami hazard assessments that reflect the substantial advances in tsunami research achieved in the last two decades; this conclusion is the result of two FEMA-sponsored workshops and the associated Tsunami Focused Study. Therefore, as part of FEMA's Map Modernization Program, a Tsunami Pilot Study was carried out in the Seaside/Gearhart, Oregon, area to develop an improved Probabilistic Tsunami Hazard Assessment (PTHA) methodology and to provide recommendations for improved tsunami hazard assessment guidelines. The Seaside area was chosen because it is typical of many coastal communities in the section of the Pacific Coast from Cape Mendocino to the Strait of Juan de Fuca, and because State Agencies and local stakeholders expressed considerable interest in mapping the tsunami threat to this area. The study was an interagency effort by FEMA, U.S. Geological Survey and the National Oceanic and Atmospheric Administration, in collaboration with the University of Southern California, Middle East Technical University. Portland State University, Horning Geosciences, Northwest Hydraulics Consultants, and the Oregon Department of Geological and Mineral Industries. Draft copies and a briefing on the contents, results and recommendations of this document were provided to FEMA officials before final publication.
Particulate generation and control in the PREPP (Process Experimental Pilot Plant) incinerator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stermer, D.L.; Gale, L.G.
1989-03-01
Particulate emissions in radioactive incineration systems using a wet scrubbing system are generally ultimately controlled by flowing the process offgas stream through a high-efficiency filter, such as a High Efficient Particulate Air (HEPA) filter. Because HEPA filters are capable of reducing particulate emissions over an order of magnitude below regulatory limits, they consequently are vulnerable to high loading rates. This becomes a serious handicap in radioactive systems when filter change-out is required at an unacceptably high rate. The Process Experimental Pilot Plant (PREPP) incineration system is designed for processing retrieved low level mixed hazardous waste. It has a wet offgasmore » treatment system consisting of a Quencher, Venturi Scrubber, Entrainment Eliminator, Mist Eliminator, two stages of HEPA filters, and induced draft fans. During previous tests, it was noted that the offgas filters loaded with particulate at a rate requiring replacement as often as every four hours. During 1988, PREPP conducted a series of tests which included an investigation of the causes of heavy particulate accumulation on the offgas filters in relation to various operating parameters. This was done by measuring the particulate concentrations in the offgas system, primarily as a function of scrub solution salt concentration, waste feed rate, and offgas flow rate. 2 figs., 9 tabs.« less
Kim, Soowon; Adamson, Katie Clarke; Balfanz, Deborah R; Brownson, Ross C; Wiecha, Jean L; Shepard, Dennis; Alles, Wesley F
2010-01-01
This paper presents a new, comprehensive tool for communities to assess opportunities for active living and healthy eating and to mobilize all sectors of society to conquer obesity and chronic disease. Relevant existing tools and input from an expert panel were considered to draft the Community Healthy Living Index (CHLI). CHLI covers five major sectors where people live, work, learn, and play: schools, afterschools, work sites, neighborhoods, and the community-at-large. CHLI and the accompanying procedures enable community teams to assess programs, the physical environment, and policies related to healthy living and to plan improvement strategies. In 2008, with local YMCAs acting as conveners, community assessment teams from six US communities pilot-tested CHLI for cognitive response testing, inter-rater reliability, and implementation feasibility. CHLI was revised to reflect the test results. Pilot analyses demonstrated that the process was feasible, with most questions being interpreted as intended and showing substantial to almost perfect agreement between raters. The final CHLI is being disseminated nationally. Preliminary data illustrate CHLI obtains reliable results and is feasible to implement. CHLI is a promising tool for community-based prevention efforts to draw attention to opportunities for healthy living and create impetus for community changes.
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2014 CFR
2014-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2011 CFR
2011-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2012 CFR
2012-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2010 CFR
2010-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2013 CFR
2013-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
Interim Report by Asia International Grid Connection Study Group
NASA Astrophysics Data System (ADS)
Omatsu, Ryo
2018-01-01
The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.
Commentary: Interim leadership of academic departments at U.S. medical schools.
Grigsby, R Kevin; Aber, Robert C; Quillen, David A
2009-10-01
Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.
Betz, J.W.; Blanco, M.A.; Cahn, C.R.; Dafesh, P.A.; Hegarty, C.J.; Hudnut, K.W.; Kasemsri, V.; Keegan, R.; Kovach, K.; Lenahan, L.S.; Ma, H.H.; Rushanan, J.J.; Sklar, D.; Stansell, T.A.; Wang, C.C.; Yi, S.K.
2006-01-01
Detailed design of the modernized LI civil signal (L1C) signal has been completed, and the resulting draft Interface Specification IS-GPS-800 was released in Spring 2006. The novel characteristics of the optimized L1C signal design provide advanced capabilities while offering to receiver designers considerable flexibility in how to use these capabilities. L1C provides a number of advanced features, including: 75% of power in a pilot component for enhanced signal tracking, advanced Weilbased spreading codes, an overlay code on the pilot that provides data message synchronization, support for improved reading of clock and ephemeris by combining message symbols across messages, advanced forward error control coding, and data symbol interleaving to combat fading. The resulting design offers receiver designers the opportunity to obtain unmatched performance in many ways. This paper describes the design of L1C. A summary of LIC's background and history is provided. The signal description then proceeds with the overall signal structure consisting of a pilot component and a carrier component. The new L1C spreading code family is described, along with the logic used for generating these spreading codes. Overlay codes on the pilot channel are also described, as is the logic used for generating the overlay codes. Spreading modulation characteristics are summarized. The data message structure is also presented, showing the format for providing time, ephemeris, and system data to users, along with features that enable receivers to perform code combining. Encoding of rapidly changing time bits is described, as are the Low Density Parity Check codes used for forward error control of slowly changing time bits, clock, ephemeris, and system data. The structure of the interleaver is also presented. A summary of L 1C's unique features and their benefits is provided, along with a discussion of the plan for L1C implementation.
Flow characteristics of an inclined air-curtain range hood in a draft
CHEN, Jia-Kun
2015-01-01
The inclined air-curtain technology was applied to build an inclined air-curtain range hood. A draft generator was applied to affect the inclined air-curtain range hood in three directions: lateral (θ=0°), oblique (θ=45°), and front (θ=90°). The three suction flow rates provided by the inclined air-curtain range hood were 10.1, 10.9, and 12.6 m3/min. The laser-assisted flow visualization technique and the tracer-gas test method were used to investigate the performance of the range hood under the influence of a draft. The results show that the inclined air-curtain range hood has a strong ability to resist the negative effect of a front draft until the draft velocity is greater than 0.5 m/s. The oblique draft affected the containment ability of the inclined air-curtain range hood when the draft velocity was larger than 0.3 m/s. When the lateral draft effect was applied, the capture efficiency of the inclined air-curtain range hood decreased quickly in the draft velocity from 0.2 m/s to 0.3 m/s. However, the capture efficiencies of the inclined air-curtain range hood under the influence of the front draft were higher than those under the influence of the oblique draft from 0.3 m/s to 0.5 m/s. PMID:25810445
Flow characteristics of an inclined air-curtain range hood in a draft.
Chen, Jia-Kun
2015-01-01
The inclined air-curtain technology was applied to build an inclined air-curtain range hood. A draft generator was applied to affect the inclined air-curtain range hood in three directions: lateral (θ=0°), oblique (θ=45°), and front (θ=90°). The three suction flow rates provided by the inclined air-curtain range hood were 10.1, 10.9, and 12.6 m(3)/min. The laser-assisted flow visualization technique and the tracer-gas test method were used to investigate the performance of the range hood under the influence of a draft. The results show that the inclined air-curtain range hood has a strong ability to resist the negative effect of a front draft until the draft velocity is greater than 0.5 m/s. The oblique draft affected the containment ability of the inclined air-curtain range hood when the draft velocity was larger than 0.3 m/s. When the lateral draft effect was applied, the capture efficiency of the inclined air-curtain range hood decreased quickly in the draft velocity from 0.2 m/s to 0.3 m/s. However, the capture efficiencies of the inclined air-curtain range hood under the influence of the front draft were higher than those under the influence of the oblique draft from 0.3 m/s to 0.5 m/s.
1982-05-07
The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.