Sample records for draft study plan

  1. 78 FR 42085 - Draft Guidance for Industry on Pediatric Study Plans: Content of and Process for Submitting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ...] Draft Guidance for Industry on Pediatric Study Plans: Content of and Process for Submitting Initial... a draft guidance for industry entitled ``Pediatric Study Plans: Content of and Process for... Plans: Content of and Process for Submitting Initial Pediatric Study Plans and Amended Pediatric Study...

  2. 77 FR 46518 - Draft Resource Management Plan/General Plan Draft Environmental Impact Statement/Revised Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Resource Management Plan/General Plan Draft... Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of... California Department of Parks and Recreation was given the responsibility to plan, design, construct...

  3. 78 FR 67187 - Notice of Availability of the Draft General Management Plan/Wilderness Study/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic Riverways (Riverways) in Missouri. DATES: The Draft GMP/WS/EIS will remain available for public review and... U.S. Environmental Protection Agency. ADDRESSES: Copies of the Draft GMP/WS/EIS will be available to...

  4. 76 FR 57760 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the... alternative) seeks to allocate limited resources among competing human interests, land uses, and conservation...

  5. 12 CFR 516.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 6 2013-01-01 2012-01-01 true What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  6. 12 CFR 516.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 6 2012-01-01 2012-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  7. 12 CFR 116.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 1 2014-01-01 2014-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  8. 12 CFR 116.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 1 2012-01-01 2012-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  9. 12 CFR 116.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  10. 12 CFR 516.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 6 2014-01-01 2012-01-01 true What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  11. 12 CFR 516.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false What information must I include in my draft... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  12. 75 FR 27705 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... subject line of e-mail comments use the following identifier: Comments on CCC Coho Draft Plan. This...: Comments on CCC Coho Draft Plan. Comments may be submitted via facsimile (fax) to (707) 578-3435. Persons... Request for CCC coho salmon Recovery Draft Plan.'' Electronic copies of the Draft Plan are also available...

  13. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  14. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... Management Plan (EIS/GMP) for Fort Raleigh National Historic Site, North Carolina. The draft describes and... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http...

  15. 76 FR 72718 - Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ....HAG11-0127] Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact... Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Baker... conditions, and changes in resource management practices since the Baker RMP of 1989. The Draft RMP/EIS was...

  16. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What must I include in my draft... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a) You must prepare and submit a draft materials separation plan for your municipal waste combustion unit...

  17. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What must I include in my draft... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a) You must prepare and submit a draft materials separation plan for your municipal waste combustion unit...

  18. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What must I include in my draft... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a) You must prepare and submit a draft materials separation plan for your municipal waste combustion unit...

  19. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What must I include in my draft... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a) You must prepare and submit a draft materials separation plan for your municipal waste combustion unit...

  20. 40 CFR 60.1065 - What must I include in my draft materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What must I include in my draft... Requirements: Materials Separation Plan § 60.1065 What must I include in my draft materials separation plan? (a) You must prepare and submit a draft materials separation plan for your municipal waste combustion unit...

  1. 76 FR 50490 - Draft Comprehensive Conservation Plan and Draft Environmental Impact Statement, Arctic National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... draft CCP and draft EIS'' in the subject line of the message. Fax: Attn: Sharon Seim, Planning Team Leader, (907) 456-0428. U.S. Mail: Sharon Seim, Planning Team Leader, Arctic National Wildlife Refuge... CONTACT: Sharon Seim, Planning Team Leader, at the address listed above, by phone at (907) 456-0501, or by...

  2. 76 FR 41808 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ...] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery..., announce the availability of the draft environmental impact statement and the draft Oncor Electric Delivery... Oncor Electric Delivery Company, LLC (Applicant; Oncor), and (2) That the Applicant has developed a...

  3. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false How do I make my draft materials... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan available to the public? (a) Distribute your draft materials separation plan to the main public libraries in...

  4. 12 CFR 390.104 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 5 2014-01-01 2014-01-01 false What information must I include in my draft... Application Processing Procedures § 390.104 What information must I include in my draft business plan? If you are required to submit a draft business plan under § 309.103, your plan must: (a) Clearly and...

  5. 12 CFR 390.104 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 5 2013-01-01 2013-01-01 false What information must I include in my draft... Application Processing Procedures § 390.104 What information must I include in my draft business plan? If you are required to submit a draft business plan under § 309.103, your plan must: (a) Clearly and...

  6. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How do I make my draft materials... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan available to the public? (a) Distribute your draft materials separation plan to the main public libraries in...

  7. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How do I make my draft materials... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan available to the public? (a) Distribute your draft materials separation plan to the main public libraries in...

  8. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How do I make my draft materials... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan available to the public? (a) Distribute your draft materials separation plan to the main public libraries in...

  9. 12 CFR 390.104 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 5 2012-01-01 2012-01-01 false What information must I include in my draft... Application Processing Procedures § 390.104 What information must I include in my draft business plan? If you are required to submit a draft business plan under § 309.103, your plan must: (a) Clearly and...

  10. 12 CFR 516.20 - What information must I include in my draft business plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What information must I include in my draft business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan...

  11. 77 FR 8890 - Clarks River National Wildlife Refuge, KY; Draft Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ...-FF04R02000] Clarks River National Wildlife Refuge, KY; Draft Comprehensive Conservation Plan and... availability of a draft comprehensive conservation plan and environmental assessment (Draft CCP/EA) for Clarks... (telephone). SUPPLEMENTARY INFORMATION: Introduction With this notice, we continue the CCP process for Clarks...

  12. 76 FR 59732 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ...] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery... availability of the draft environmental impact statement (DEIS) and the draft Oncor Electric Delivery Company... announced that Oncor Electric Delivery Company, LLC, has applied under section 10(a)(1)(B) of the Endangered...

  13. 78 FR 78366 - Draft Generic Drug User Fee Act Information Technology Plan; Availability for Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ...] Draft Generic Drug User Fee Act Information Technology Plan; Availability for Comment AGENCY: Food and... the availability for public comment of the draft information technology (IT) plan entitled ``GDUFA Information Technology Plan.'' This plan is intended to provide FDA's approach for enhancing business...

  14. 78 FR 78367 - Draft Prescription Drug User Fee Act V Information Technology Plan; Availability for Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ...] Draft Prescription Drug User Fee Act V Information Technology Plan; Availability for Comment AGENCY... announcing the availability for public comment of the draft information technology (IT) plan entitled ``PDUFA V Information Technology Plan.'' This plan is intended to provide FDA's approach for enhancing...

  15. 76 FR 57759 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Kremmling Field... Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM) has prepared a Draft Resource... alternatives for future [[Page 57760

  16. 78 FR 18674 - Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ...-0002] Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan... for public comment on its draft strategic plan, U.S. Department of Transportation, Research, Development and Technology Strategic Plan FY 2013-2018. The new five-year strategic plan will guide the...

  17. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC), Department of Health and Human Services (DHHS). ACTION... requesting public comment on the draft A Public Health Action Plan to Combat Antimicrobial Resistance. HHS...

  18. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC), Department of Health and Human Services (DHHS). ACTION... Federal Register requesting public comment on the draft, A Public Health Action Plan to Combat...

  19. 75 FR 63851 - Draft General Management Plan and Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... the Interior. ACTION: Notice of Availability of the Draft General Management Plan and Environmental... 63852

  20. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service Coral Reef Restoration Plan, Draft Programmatic... Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National Environmental... availability of a Draft Programmatic Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan...

  1. 75 FR 1806 - Draft General Management Plan and Environmental Impact Statement, New River Gorge National River, WV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... Interior. ACTION: Notice of availability of the Draft General Management Plan and Environmental Impact...

  2. Architectural Drafting, Drafting 2: 9255.04.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course covers the basic fundamentals of architectural drafting and is not intended to delve into the more advanced phases of architecture. The student is presented with standards and procedures, and will become proficient in layout of floor plans, electrical plans, roof construction, foundation plans, typical wall construction, plot plans, and…

  3. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION... Federal Register of May 23, 2012, concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal Year 2012 Work Plan is to provide clarifying edits. In...

  4. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska AGENCY: Bureau of Land.../Draft Environmental Impact Statement (EIS) for the Ring of Fire RMP for the Haines Planning Area and by... Fire RMP-- Haines Planning Area Amendment by any of the following methods: Email: [email protected

  5. 78 FR 39253 - Notice of Extension of Comment Period for Draft Initial Comprehensive Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ...Pursuant to the Resources and Ecosystems Sustainability, Tourist Opportunities, and Revived Economies of the Gulf States Act (RESTORE Act), the Secretary of Commerce, as Chair of the Gulf Coast Ecosystem Restoration Council (Council), announces the extension of the public comment period for the Draft Initial Comprehensive Plan (Draft Plan) to restore and protect the Gulf Coast region and the Draft Programmatic Environmental Assessment (Draft PEA) for the Draft Plan. Council Members also have compiled preliminary lists of ecosystem restoration projects that are ``authorized but not yet commenced'' and the full Council is in the process of evaluating these lists; the Council announces the availability of these preliminary lists. If you previously submitted comments, please do not resubmit them because the Council has already incorporated them into the public record and will fully consider them.

  6. 76 FR 55923 - Draft Guidance for Industry: Submission of Warning Plans for Cigarettes and Smokeless Tobacco...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ...] Draft Guidance for Industry: Submission of Warning Plans for Cigarettes and Smokeless Tobacco Products... the availability of a draft guidance for industry entitled ``Submission of Warning Plans for... submitting warning plans to FDA under the Comprehensive Smokeless Tobacco Health Education Act, as amended by...

  7. 76 FR 65744 - Draft Environmental Assessment and Draft Habitat Conservation Plan for Lower Colorado River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...] Draft Environmental Assessment and Draft Habitat Conservation Plan for Lower Colorado River Authority... of availability of documents and announcement of public hearings. SUMMARY: The Lower Colorado River... issuance of an incidental take permit (ITP) to Lower Colorado River Authority Transmission Services...

  8. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability and Meetings... amended, NOAA is soliciting public comment on the draft management plan and draft environmental assessment... draft environmental assessment will be considered if received on or before June 22, 2012. Public...

  9. 78 FR 47410 - General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ...] General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area, New... (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the General Management Plan (GMP... alternatives to guide the management of the site over the next 20 years. The NPS preferred alternative...

  10. Preparing the Army for Stability Operations: Doctrinal and Interagency Issues

    DTIC Science & Technology

    2007-01-01

    discuss these issues at length in Chapter Three). Similarly, the Draft Planning Framework is not yet part of the military planning process. It remains a...Draft Planning Framework for Reconstruction, Stabilization, and Conflict Transformation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 The...level from the perspective of impli- cations for the Army and its development of SSTR capabilities. The U.S. Government Draft Planning Framework for

  11. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on my draft materials separation plan? (a) You must hold a public meeting and accept comments on your...

  12. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on my draft materials separation plan? (a) You must hold a public meeting and accept comments on your...

  13. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on my draft materials separation plan? (a) You must hold a public meeting and accept comments on your...

  14. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on my draft materials separation plan? (a) You must hold a public meeting and accept comments on your...

  15. 40 CFR 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meeting on my draft materials separation plan? 60.1080 Section 60.1080 Protection of Environment... Preconstruction Requirements: Materials Separation Plan § 60.1080 Where and when must I hold a public meeting on my draft materials separation plan? (a) You must hold a public meeting and accept comments on your...

  16. 76 FR 35216 - Science Advisory Board Staff Office Notification of a Public Teleconference of the Chartered...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ...The EPA Science Advisory Board (SAB) Staff Office announces a public teleconference of the chartered SAB on July 5, 2011 to conduct a quality review of a draft SAB report, Review of EPA's Draft Hydraulic Fracturing Study Plan (Quality Review Draft).

  17. 77 FR 43609 - Endangered and Threatened Wildlife and Plants; Incidental Take Permit Application; Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ... Environmental Assessment and Draft San Luis Valley Regional Habitat Conservation Plan, Colorado AGENCY: Fish and... implementation of a regional habitat conservation plan (HCP) in the San Luis Valley, Colorado. Pursuant to the ESA and the National Environmental Policy Act, we announce the availability of the draft HCP and draft...

  18. Mississippi Curriculum Framework for General Drafting (Program CIP: 48.0101--Drafting, General). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in drafting: drafting I and II. Presented…

  19. 12 CFR 516.15 - Must I meet with OTS before I file my application?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... with OTS before filing your application. You must submit a draft business plan before this meeting. (2... you to submit a draft business plan or other relevant information before this meeting. (b) Contacting... pre-filing meeting or a draft business plan, the Regional Office will determine whether it will...

  20. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  1. 77 FR 31869 - Iris Lacustris (Dwarf Lake Iris); Draft Recovery Plan for Review and Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Threatened Plants. The Service solicits review and comment from the public on this draft plan. DATES... to review the draft recovery plan may obtain a copy by contacting the Field Supervisor, U.S. Fish and Wildlife Service, Ecological Services Field Office, 2651 Coolidge Road, Suite 101, East Lansing, MI 48823...

  2. 76 FR 38203 - Endangered and Threatened Wildlife and Plants; Amendment to the Draft Recovery Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ..., habituation to captive conditions, and genetic bottlenecks. The prospects for long-term viability of the...] Endangered and Threatened Wildlife and Plants; Amendment to the Draft Recovery Plan for the Columbia Basin...), announce the availability of an amendment to the Draft Recovery Plan for the Columbia Basin Distinct...

  3. 75 FR 15723 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Mariana Fruit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... long-term support for and participation in the recovery effort through outreach and education...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Mariana Fruit Bat or... document availability for review and comment; draft revised recovery plan. SUMMARY: We, the U.S. Fish and...

  4. 76 FR 3209 - West Los Angeles VA Medical Center Veterans Programs Enhancement Act of 1998; Draft Master Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Federal Register Notice announces an opportunity for public comment on the West Los Angeles (WLA... to ``Notice: Draft Master Plan.'' All comments received will be available for public inspection in...-recurring filming and single-day event agreements. The purpose of the Draft Master Plan is to satisfy the...

  5. Review of the Draft 2014 Science Mission Directorate Science Plan

    NASA Technical Reports Server (NTRS)

    2013-01-01

    At the request of NASA's Science Mission Directorate (SMD), the National Research Council's (NRC's) Space Studies Board (SSB) initiated a study to review a draft of the SMD's 2014 Science Plan. The request for this review was made at a time when NASA is engaged in the final stages of a comprehensive, agency-wide effort to develop a new strategic plan and at a time when NASA's budget is under considerable stress. SMD's Science Plan serves to provide more detail on its four traditional science disciplines-astronomy and astrophysics, solar and space physics (also called heliophysics), planetary science, and Earth remote sensing and related activities-than is possible in the agency-wide Strategic Plan. In conducting its review of the draft Science Plan, the Committee on the Assessment of the NASA Science Mission Directorate 2014 Science Plan was charged to comment on the following specific areas: (1) Responsiveness to the NRC's guidance on key science issues and opportunities in recent NRC reports; (2) Attention to interdisciplinary aspects and overall scientific balance; (3) Identification and exposition of important opportunities for partnerships as well as education and public outreach; (4) Integration of technology development with the science program; (5) Clarity on how the plan aligns with SMD's strategic planning process; (6) General readability and clarity of presentation; and (7) Other relevant issues as determined by the committee. The main body of the report provides detailed findings and recommendations relating to the draft Science Plan. The highest-level, crosscutting issues are summarized here, and more detail is available in the main body of the report.

  6. Introduction to Production/Manufacturing Drafting. Drafting Module 8. Instructor's Guide.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Instructional Materials Lab.

    This module, 1 of 10 in the Drafting curriculum guide developed in Missouri, contains 3 units of study that include some or all of the following components: performance objectives, lesson plans, information sheets, transparency masters, handouts, assignment sheets, job sheets, a unit test, and answers to the unit test. Special instructions on…

  7. 75 FR 16499 - Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ...] Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum (Astragalus... availability of the technical agency draft recovery plan for Pyne's ground-plum (Astragalus bibullatus), a...: Background We listed Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on...

  8. 75 FR 39038 - Tamarac National Wildlife Refuge and Wetland Management District, Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... forest birds and their habitats. Alternative 4: Current Management Direction of Conservation, Restoration... Service, Interior. ACTION: Notice of Availability: draft comprehensive conservation plan and environmental... availability of a draft comprehensive conservation plan (CCP) and draft environmental assessment (EA) for...

  9. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... deep draft channel and harbor? 148.215 Section 148.215 Navigation and Navigable Waters COAST GUARD... General § 148.215 What if a port has plans for a deep draft channel and harbor? (a) If a State port will... draft channel and harbor, a representative of the port may request a determination under 33 U.S.C. 1503...

  10. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... General § 148.215 What if a port has plans for a deep draft channel and harbor? (a) If a State port will be directly connected by pipeline to a proposed deepwater port, and has existing plans for a deep... deep draft channel and harbor? 148.215 Section 148.215 Navigation and Navigable Waters COAST GUARD...

  11. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... representative. The Administrator will also give notice of any approval in the Federal Register. The plans will... response to public comments submitted on the draft offset plan or disapproval of a draft offset plan... offset plan. The Administrator will serve a copy of any approved offset plan and the response to comments...

  12. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... representative. The Administrator will also give notice of any approval in the Federal Register. The plans will... response to public comments submitted on the draft offset plan or disapproval of a draft offset plan... offset plan. The Administrator will serve a copy of any approved offset plan and the response to comments...

  13. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... representative. The Administrator will also give notice of any approval in the Federal Register. The plans will... response to public comments submitted on the draft offset plan or disapproval of a draft offset plan... offset plan. The Administrator will serve a copy of any approved offset plan and the response to comments...

  14. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... representative. The Administrator will also give notice of any approval in the Federal Register. The plans will... response to public comments submitted on the draft offset plan or disapproval of a draft offset plan... offset plan. The Administrator will serve a copy of any approved offset plan and the response to comments...

  15. 75 FR 67149 - Request for Public Comment on the Draft 2010 National Nanotechnology Initiative Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ... Nanotechnology Initiative Strategic Plan AGENCY: White House Office of Science and Technology Policy. ACTION... Nanotechnology Initiative (NNI) Strategic Plan. The draft plan is posted at http://strategy.nano.gov . Comments... information. Overview: The National Nanotechnology Initiative (NNI) Strategic Plan is the framework that...

  16. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  17. 77 FR 39686 - Draft Programmatic Environmental Impact Statement and Restoration Plan To Compensate for Injuries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... Programmatic Environmental Impact Statement and Restoration Plan To Compensate for Injuries to Natural... Environmental Impact Statement and Restoration Plan; request for comments. SUMMARY: NOAA, the Department of the... Statement (PEIS) and Draft Restoration Plan are being released for public comment. The Restoration Plan...

  18. 75 FR 47346 - Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-05

    ...://www.treas.gov/offices/management/budget/strategic-plan/2007-2012/strategic-plan2007-2012.pdf . The....ustreas.gov/offices/management/budget/strategic-plan/ and by clicking on the comment link. Comments may... DEPARTMENT OF THE TREASURY Draft Strategic Plan for FY 2010-2015 AGENCY: United States Department...

  19. 76 FR 53149 - North American Waterfowl Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...

  20. Draft Maumee River Watershed Restoration Plan

    EPA Pesticide Factsheets

    A draft of the Maumee River AOC Watershed Restoration Plan was completed in January 2006. The plan was created to meet requirements for the stage II RAP as well as Ohio EPA’s and ODNR’s Watershed Coordinator Program.

  1. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Notice of availability and request for public comment..., Division of Reproductive Health, Attn: National Public Health Action Plan for the Detection, Prevention...

  2. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  3. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  4. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Extension of public comment period. SUMMARY: On May 16... National Public Health Action Plan for the Detection, Prevention, and Management of Infertility (77 FR...

  5. 77 FR 52754 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... include new and existing small-scale wind energy facilities, such as single-turbine demonstration projects, as well as large, multi-turbine commercial wind facilities. Covered Species The planning partners are...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...

  6. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  7. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0184] Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear Regulatory... Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan'' (Agencywide...

  8. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... location of the public libraries where the public can find your materials separation plan. Include the... separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan...

  9. 77 FR 132 - General Management Plan and Environmental Impact Statement for Lincoln Home National Historic Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...: The Abbreviated Final General Management Plan and Environmental Impact Statement (GMP/EIS) will remain... Site. SUPPLEMENTARY INFORMATION: We, the National Park Service, prepared a draft GMP/EIS for the park... summaries of the draft GMP/EIS. In addition to the distribution, the draft GMP/EIS was also made available...

  10. 75 FR 17951 - Notice Re-opening the Comment Period for the Draft Resource Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ...The Bureau of Land Management (BLM) announces a re-opening of the comment period on the Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Clear Creek Management Area (CCMA). The original notice was published in the Federal Register on December 4, 2009 [74 FR 0232] and provided for a comment period to end on March 5, 2010. The BLM is re-opening the comment period to end April 19, 2010.

  11. 76 FR 56220 - Draft Environmental Impact Statement for General Management Plan for Golden Gate National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... Environmental Impact Statement for General Management Plan for Golden Gate National Recreation Area and Muir... Management Plan for Golden Gate National Recreation Area and Muir Woods National Monument. SUMMARY: In accord... Environmental Impact Statement (Draft EIS) for the updating the General Management Plan (GMP) for Golden Gate...

  12. 76 FR 35009 - Draft Oil and Gas Management Plan/Environmental Impact Statement for Big South Fork National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... DEPARTMENT OF THE INTERIOR National Park Service [5130-0400-NZM] Draft Oil and Gas Management Plan... Management Plan/ Environmental Impact Statement for Big South Fork National River and Recreation Area and... gas management plan/environmental impact statement (OGMP/DEIS) for the proposed Big South Fork...

  13. Draft Detailed Project Report and Draft Environmental Assessment. Neah Bay Navigation Improvements, Neah Bay, Washington

    DTIC Science & Technology

    1993-11-01

    navigation improvements for Neah Bay, Clallam Bay, and Port Angeles was begun under the Puget Sound and Adjacent Waters, General Investigations authority. The...Regonnaissance Report and Plan of Study. Puget Sound and Adjacent Waters. Washington. Northern Olympic Peninsula Shallow-Draft Naviaation Study, August 1983...operators from having to make long trips from the fishing grounds near Neah Bay to ports farther east in the Strait of Juan de Fuca or in Puget Sound . 9 9

  14. 77 FR 1717 - Notice of Availability; Draft Springfield Plateau Regional Restoration Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Resources, have written a Draft Springfield Plateau Regional Restoration Plan and Environmental Assessment... Plateau ecoregion, and an environmental assessment, as required pursuant to the National Environmental... Springfield Plateau Regional Restoration Plan and Environmental Assessment will be finalized prior to...

  15. 76 FR 38685 - Draft General Management Plan Amendment/Environmental Impact Statement, Tumacacori National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... experience at Tumacacori by developing access to these associated mission resources. A general management... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan Amendment... Management Plan, Tumacacori National Historical Park, in favor of an Environmental Assessment. SUMMARY: The...

  16. 78 FR 12764 - Draft Office of Health Assessment and Translation Approach for Systematic Review and Evidence...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... Approach--February 2013 might be needed, OHAT plans to apply it to two case-study evaluations. One case... Availability: Draft OHAT Approach--February 2013 will be available by February 26, 2013, and case-study... framework, describe the contents in the case-study protocols, and respond to questions from the public on...

  17. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that the port has an active study by the Secretary of the Army for the construction of a deep draft... in tax revenues; (vii) Environmental and social impacts of the project on the local and regional...

  18. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that the port has an active study by the Secretary of the Army for the construction of a deep draft... in tax revenues; (vii) Environmental and social impacts of the project on the local and regional...

  19. 76 FR 22394 - Science Advisory Board Staff Office; Notification of a Public Teleconferences of the Science...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ...The Environmental Protection Agency (EPA or Agency) Science Advisory Board (SAB) Staff Office announces two public teleconferences of the SAB Panel to discuss its draft report of the review of EPA's Draft Hydraulic Fracturing Study Plan.

  20. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... waste. The draft Strategic Plan also describes the agency's Organizational Excellence Objectives of Openness, Regulatory Effectiveness, and Operational Excellence, which characterize the manner in which the...

  1. Draft Updates to the Planning for Natural Disaster Debris Guidance and to Related Documents

    EPA Pesticide Factsheets

    EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.

  2. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation Area and Alibates... Management Plan, Lake Meredith National Recreation Area and Alibates Flint Quarries National Monument, Texas... management alternatives for Lake Meredith National Recreation Area and three management alternatives for...

  3. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application... Tribe/Consortium in drafting its planning grant application? 1000.68 Section 1000.68 Indians OFFICE OF... planning grant application? Yes, upon request from the Tribe/Consortium, a non-BIA bureau may provide...

  4. 75 FR 57055 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog AGENCY: Fish... recovery plan for the Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened... and peer reviewers in an appendix to the approved recovery plan. The Utah prairie dog (Cynomys...

  5. Drafting.

    ERIC Educational Resources Information Center

    Hughes, Larry R.

    This guide to teaching drafting, one in a series of instructional materials for junior high industrial arts education, is designed to assist teachers as they plan and implement new courses of study and as they make revisions and improvements in existing courses in order to integrate classroom learning with real-life experiences. This drafting…

  6. Public Comment Period Open for the Draft Update to the Planning for Natural Disaster Debris Guidance and to Related Documents

    EPA Pesticide Factsheets

    EPA is requesting comment on the draft Planning for Natural Disaster Debris Guidance, and two other documents. The Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.

  7. 75 FR 13081 - Endangered and Threatened Species; Notice of Intent to Prepare a Recovery Plan for Central...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... Salmon AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration.... SUMMARY: NMFS announces that the Draft Recovery Plan for Central California Coast coho salmon (Draft Plan... coho salmon (Oncorhynchus kisutch) Evolutionarily Significant Unit (ESU). NMFS is soliciting review and...

  8. 75 FR 6696 - Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Recovery Plan. The plan also addresses several federally endangered plant species: Cirsium hydrophilum var... animals and plants is a primary goal of the Endangered Species Act (Act) (16 U.S.C. 1531 et seq.) and our... five endangered species. The biology of these species is at the core of the draft recovery plan, but...

  9. Questions to Consider When Reviewing Draft WIOA State Plans. WIOA Game Plan for Low-Income People

    ERIC Educational Resources Information Center

    Center for Law and Social Policy, Inc. (CLASP), 2016

    2016-01-01

    As states release draft Workforce Innovation and Opportunity Act (WIOA) state plans for public comment, advocates and other stakeholders have an important opportunity to improve them. The Center for Law and Social Policy (CLASP) is offering a list of questions, which is included in this document, to consider when reviewing state plans. These…

  10. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR0000.L16100000.DP0000.LXSS042K0000] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices...

  11. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... submitted pursuant to § 921.12, the state may begin draft management plan development and the collection of information necessary for the preparation by NOAA of an EIS. The state shall develop a draft management plan... areas of the Reserve, ranking these areas according to their relative importance, and including a...

  12. 76 FR 79708 - Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ...). The Plan/DEIS evaluates four alternatives for updating the current approach to management in Golden.... In recognition of the complexity of the proposed plan alternatives, and with deference to interest... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO-1108-8862; 2031-A038-409] Draft...

  13. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 1: Plenary Session

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Briefings from the plenary session of the conference on SSTAC/ARTS Review of the Draft Integrated Technology Plan (ITP) held on 24-28 Jun. 1991 are included. Viewgraphs from the presentations are included.

  14. 76 FR 75557 - Draft Environmental Impact Statement for General Management Plan/Wilderness Study, Hawaii...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park... Service is expanding the scope of the Environmental Impact Statement (EIS) that is being prepared for updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...

  15. 75 FR 30422 - Swan Lake National Wildlife Refuge, Chariton County, MO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... the next 15 years. Management includes conservation, restoration, and preservation but occurs...: Notice of availability: draft comprehensive conservation plan and environmental assessment; request for... comprehensive conservation plan (CCP) and draft environmental assessment (EA) for Swan Lake National Wildlife...

  16. 78 FR 39736 - Draft Guidance for Industry: Considerations for the Design of Early-Phase Clinical Trials of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ..., choosing a study population, using a control group and blinding, dose selection, treatment plans...] Draft Guidance for Industry: Considerations for the Design of Early-Phase Clinical Trials of Cellular... document entitled ``Guidance for Industry: Considerations for the Design of Early-Phase Clinical Trials of...

  17. 76 FR 31973 - Endangered and Threatened Wildlife and Plants; Notice of Availability of Draft Recovery Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... for invasive introduced plant removal, as appropriate, and adaptive management plans to address... consider the species for reclassification or removal from the Federal List of Endangered and Threatened... hispida under the Endangered Species Act of 1973, as amended (Act). This draft plan is an addendum to the...

  18. Reflections on the Draft National Educational Technology Plan 2010: Foundations for Transformation

    ERIC Educational Resources Information Center

    Dede, Chris

    2010-01-01

    This article provides personal reflections about aspects of the draft "National Educational Technology Plan 2010". Its focus is on ideas in the Plan that could be foundational for transforming our industrial-era schooling system. In sharing these thoughts, the author is speaking only for himself: they do not necessarily reflect the discussions or…

  19. 77 FR 56858 - Endangered and Threatened Wildlife and Plants; Draft Recovery Plan for Four Subspecies of Island Fox

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ...] Endangered and Threatened Wildlife and Plants; Draft Recovery Plan for Four Subspecies of Island Fox AGENCY... Plan for Four Subspecies of Island Fox (Urocyon littoralis) under the Endangered Species Act of 1973, as amended (Act). Each of the four subspecies, San Miguel Island fox (Urocyon littoralis littoralis...

  20. 78 FR 62646 - Endangered and Threatened Wildlife and Plants; Permits; Low-Effect Habitat Conservation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... the Utah Prairie Dog in Garfield County, Utah AGENCY: Fish and Wildlife Service, Interior. ACTION... Draft Low-effect Habitat Conservation Plan (HCP) for the Utah prairie dog in Garfield County, Utah, for... review and comment of the Draft Low-effect Habitat Conservation Plan for the Utah prairie dog in Garfield...

  1. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  2. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  3. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  4. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  5. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  6. 76 FR 45848 - Draft Environmental Impact Statement on a Denali Park Road Vehicle Management Plan for Denali...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... DEPARTMENT OF THE INTERIOR National Park Service Draft Environmental Impact Statement on a Denali..., Interior. ACTION: Notice of availability of the Draft Environmental Impact Statement on a Denali Park Road... announces the availability of a Draft Environmental Impact Statement (DEIS) on a Denali Park Road Vehicle...

  7. 76 FR 41510 - Draft Environmental Impact Statement and Habitat Conservation Plan for Commercial Wind Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ...] Draft Environmental Impact Statement and Habitat Conservation Plan for Commercial Wind Energy... regional- level construction, operation, and maintenance associated with multiple commercial wind energy...; Attention: Laila Lienesch; Facsimile: 505/248-6922 (Attention: Laila Lienesch); E-Mail: WindEnergy...

  8. 77 FR 15052 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... COUNCIL ON ENVIRONMENTAL QUALITY National Ocean Council--National Ocean Policy Draft Implementation Plan AGENCY: Council on Environmental Quality. ACTION: Extension of comment period. SUMMARY: On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the...

  9. Library of Congress: Status of Retail Activities

    DTIC Science & Technology

    2002-04-29

    34 positions within the past 9 months, • completing the first draft of a business planning and marketing strategy for the Photoduplication Service...positions within the past 9 months, • completing the first draft of a business planning and marketing strategy for the Photoduplication Service

  10. Deadline extended for public comment on IOOS' Draft Plan for Data Management and Communications Component

    NASA Astrophysics Data System (ADS)

    The U.S. Integrated ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and communications (DMAC) component. The deadline for receipt of comments has been extended to 18 November 2003.

  11. 77 FR 17091 - Trust Land Consolidation Draft Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Trust Land Consolidation Draft Plan AGENCY... Cobell Class Action Settlement Agreement established a trust land consolidation fund to be used for consolidating Indian trust and restricted lands and acquiring fractional interests in these lands. We are...

  12. 77 FR 5528 - Trust Land Consolidation Draft Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Trust Land Consolidation Draft Plan AGENCY... Settlement Agreement established a trust land consolidation fund to be used for consolidating Indian trust... litigation seeking redress for the alleged mismanagement of land trust accounts for American Indians. The...

  13. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under § 270.110(a...

  14. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under § 270.110(a...

  15. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under § 270.110(a...

  16. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under § 270.110(a...

  17. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under § 270.110(a...

  18. 78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with Office of Management and Budget Circular No. A-11, the Defense Nuclear Facilities Safety Board (DNFSB) is soliciting...

  19. 75 FR 4794 - Draft Revised Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2010-2015 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with OMB Circular No. A-11, the Defense Nuclear Facilities Safety Board is soliciting comments from all interested and potentially...

  20. Joint Planning and Development Office Work Plan FY10

    DTIC Science & Technology

    2010-01-01

    IPSA ) Division will make refinements to the NextGen Portfolio Analysis. In addition, IPSA will work with the Department of Defense (DoD) to define and...Submitted Interagency Portfolio and Systems Analysis ( IPSA ) DRAFT DoD Portfolio Analysis Criteria BASELINE DoD Portfolio Analysis Criteria DRAFT...WG Work Plan Review Prototype Capability Selected and Defined CHAs Complete Safety Metrics for IPSA Complete FINAL Prototype Report FINAL

  1. 15 CFR 990.23 - Compliance with NEPA and the CEQ regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL POLLUTION...) The Draft Restoration Plan/EA must be made available for public review before concluding a FONSI or... analysis. (D) The time period for public review on the Draft Restoration Plan/EA must be consistent with...

  2. 15 CFR 990.23 - Compliance with NEPA and the CEQ regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL POLLUTION...) The Draft Restoration Plan/EA must be made available for public review before concluding a FONSI or... analysis. (D) The time period for public review on the Draft Restoration Plan/EA must be consistent with...

  3. 15 CFR 990.23 - Compliance with NEPA and the CEQ regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL POLLUTION...) The Draft Restoration Plan/EA must be made available for public review before concluding a FONSI or... analysis. (D) The time period for public review on the Draft Restoration Plan/EA must be consistent with...

  4. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    .... Alternative 2, the NPS preferred alternative, would support a broad ecosystem approach for preserve management... management of cross-boundary resource issues and the importance of encouraging partnerships to address and... Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas AGENCY: National...

  5. Draft Plan for Development of the Integrated Science Assessment for Nitrogen Oxides - Health Criteria

    EPA Science Inventory

    EPA has announced a draft development plan for the next Integrated Science Assessment (ISA) for the health effects of nitrogen oxides (NOX) which will serve as the scientific basis for review of the primary (health-based) National Ambient Air Quality Standard for nitrogen dioxide...

  6. 77 FR 37438 - Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga Valley National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-MWR-CUVA-10100; 6065-4000-409] Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga Valley National Park, Ohio AGENCY: National Park Service, Interior. ACTION: Notice of Availability. SUMMARY: The National Park Service (NPS...

  7. 76 FR 48879 - Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ...] Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for Incidental... future incidental take applications. The take would affect the federally endangered Alabama beach mouse... GCP and the dEIS. These documents analyze the take of the Alabama beach mouse incidental to...

  8. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... made publicly available at any time. While you can ask us in your comment to withhold your personal... DEPARTMENT OF THE INTERIOR National Park Service [2310-0070-422] Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park AGENCY: National Park Service, Interior...

  9. 75 FR 43528 - Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Office of the Secretary Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan AGENCY: Department of Health and Human... Interim Implementation Guide for the National Health Security Strategy of the United States of America...

  10. 78 FR 64970 - New Deadlines for Public Comment on Draft Environmental Documents

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ... interested parties to contact Service personnel and Web sites for information about these draft documents. As..., fdsys/pkg/FR-2013- CO; Comprehensive Conservation 08-07/pdf/2013- Plan and Environmental Impact 19052.pdf. Statement; Two Ponds National Wildlife Refuge, Arvada, CO; Comprehensive Conservation Plan and...

  11. Burn disaster response planning: an urban region's approach.

    PubMed

    Yurt, Roger W; Lazar, Eliot J; Leahy, Nicole E; Cagliuso, Nicholas V; Rabbitts, Angela C; Akkapeddi, Vijay; Cooper, Arthur; Dajer, Antonio; Delaney, Jack; Mineo, Frank P; Silber, Steven H; Soloff, Lewis; Magbitang, Kevin; Mozingo, David W

    2008-01-01

    The objective of this study was to describe a draft response plan for the tiered triage, treatment, or transportation of 400 adult and pediatric victims (50/million population) of a burn disaster for the first 3 to 5 days after injury using regional resources. Review of meeting minutes and the 11 deliverables of the draft response plan was performed. The draft burn disaster response plan developed for NYC recommended: 1) City hospitals or regional burn centers within a 60-mile distance be designated as tiered Burn Disaster Receiving Hospitals (BDRH); 2) these hospitals be divided into a four-tier system, based on clinical resources; and 3) burn care supplies be provided to Tier 3 nonburn centers. Existing burn center referral guidelines were modified into a hierarchical BDRH matrix, which would vector certain patients to local or regional burn centers for initial care until capacity is reached; the remainder would be cared for in nonburn center facilities for up to 3 to 5 days until a city, regional, or national burn bed becomes available. Interfacility triage would be coordinated by a central team. Although recommendations for patient transportation, educational initiatives for prehospital and hospital providers, city-wide, interfacility or interagency communication strategies and coordination at the State or Federal levels were outlined, future initiatives will expound on these issues. An incident resulting in critically injured burn victims exceeding the capacity of local and regional burn center beds may be a reality within any community and warrants a planned response. To address this possibility within New York City, an initial draft of a burn disaster response has been created. A scaleable plan using local, state, regional, or federal health care and governmental institutions was developed.

  12. 78 FR 68469 - Draft General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ...: The park includes five remote islands spanning 2,228 square miles of land and sea. Updating the park's... General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands National Park... (GMP)/Wilderness Study/Environmental Impact Statement (EIS) for Channel Islands National Park. The...

  13. 75 FR 48382 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0275] Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-1228, ``Standard Format and Content of License Termination Plans for Nuclear Power Reactors.'' FOR FURTHER INFORMATION CONTACT: James C....

  14. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 6: Controls and guidance

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft Integrated Technology Plan (ITP) on controls and guidance are included. Topics covered include: strategic avionics technology planning and bridging programs; avionics technology plan; vehicle health management; spacecraft guidance research; autonomous rendezvous and docking; autonomous landing; computational control; fiberoptic rotation sensors; precision instrument and telescope pointing; microsensors and microinstruments; micro guidance and control initiative; and earth-orbiting platforms controls-structures interaction.

  15. 77 FR 53221 - Santa Clara Valley Habitat Conservation Plan/Natural Community Conservation Plan, Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... review. The EIS was updated to address the comments received on the 2010 Draft EIS. We are considering... burrowing owl (Athene cunicularia hypugaea), tricolored blackbird (Agelaius tricolor), Mount Hamilton... received on the Draft EIR/ EIS and our responses to those comments. Following a 30-day review period, we...

  16. 78 FR 17708 - Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the Grizzly Bear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the Grizzly Bear Recovery Plan... Revised Supplement to the Grizzly Bear Recovery Plan. Specifically, this supplement proposes to revise the demographic recovery criteria for the Yellowstone Ecosystem. In the lower 48 States, Grizzly bears (Ursus...

  17. 76 FR 40927 - Endangered and Threatened Wildlife and Plants; Draft Habitat Conservation Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ...] Endangered and Threatened Wildlife and Plants; Draft Habitat Conservation Plan and Environmental Assessment..., a golf and racquet club facility, a network of man-made navigable lagoons, a restaurant, commercial... year at sea, forage in the open ocean, and breed on Kauai. Beginning in March and April, adults...

  18. 75 FR 56131 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl... endangered or threatened animals and plants is a primary goal of our endangered species program and the... relevant biology, including new scientific information that has become available and critical peer-review...

  19. 75 FR 74742 - Notice of Extension of Public Comment Period to Notice of Availability of the Draft Jarbidge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Resource Management Plan and Environmental Impact Statement, Idaho AGENCY: Bureau of Land Management... Availability of the Draft Jarbidge Field Office Resource Management Plan (RMP) and Environmental Impact Statement (EIS) in the Federal Register on September 3, 2010 [75 FR 54177] and [[Page 74743

  20. 77 FR 36573 - DRAFT General Management Plan and Draft Environmental Impact Statement, Fort Matanzas National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Statement (EIS) for the General Management Plan (GMP) for Fort Matanzas National Monument (Monument... EIS/GMP describes the NPS preferred alternative--Alternative B--to guide the management of the... prescriptions to ensure protection, access and enjoyment of the Monument's resources. An up-to-date GMP is...

  1. 78 FR 13376 - Draft Environmental Impact Statement for the Cottonwood Cove and Katherine Landing Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... Environmental Impact Statement for the Cottonwood Cove and Katherine Landing Development Concept Plans, Clark...) for the Cottonwood Cove and Katherine Landing Development Concept Plans, Lake Mead National Recreation... environment. DATES: The National Park Service will accept comments on the Draft EIS from the public for 60...

  2. 75 FR 28073 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0181] Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-3039, ``Standard Format and Content for Emergency Plans for Fuel Cycle and Materials Facilities.'' FOR FURTHER INFORMATION CONTACT: Kevin M....

  3. Pipe Drafting with CAD. Teacher Edition.

    ERIC Educational Resources Information Center

    Smithson, Buddy

    This teacher's guide contains nine units of instruction for a course on computer-assisted pipe drafting. The course covers the following topics: introduction to pipe drafting with CAD (computer-assisted design); flow diagrams; pipe and pipe components; valves; piping plans and elevations; isometrics; equipment fabrication drawings; piping design…

  4. 77 FR 28422 - 2012 Draft Report: Strategies for Serving Our Women Veterans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... DEPARTMENT OF VETERANS AFFAIRS 2012 Draft Report: Strategies for Serving Our Women Veterans AGENCY... (VA) established the Women Veterans' Task Force in July 2011, to develop a comprehensive action plan for VA that will focus on resolving critical issues facing women Veterans. The 2012 Draft Report...

  5. 78 FR 3420 - Office of Environmental Information; Announcement of Availability and Comment Period for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ...) Organizations and two associated draft QA Handbooks; 1) draft Handbook for Preparing Quality Management Plans... Availability and Comment Period for the Draft Quality Standard for Environmental Data Collection, Production, and Use by Non-EPA (External) Organizations and Two Associated QA Handbooks; Correction AGENCY...

  6. 76 FR 38680 - Notice of Availability of the Draft Environmental Impact Statement for the West Chocolate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... solar, wind and geothermal testing and development in a renewable energy evaluation area located near... pending geothermal lease application within the renewable energy evaluation area. This CDCA Draft Plan... Availability of the Draft Environmental Impact Statement for the West Chocolate Mountains Renewable Energy...

  7. 77 FR 74852 - Draft Guidance for Industry on Certification of Designated Medical Gases; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ... the availability of a draft guidance for industry entitled ``Certification Process for Designated Medical Gases.'' This draft guidance describes the new certification process created by the Food and Drug Administration Safety and Innovation Act (FDASIA) for certain medical gases and explains how FDA plans to...

  8. Stakeholder Engagement Road Map and Peer Review Overview for EPA's Study of the Potential Impacts of Hydraulic Fracturing on Drinking Water Resources

    EPA Pesticide Factsheets

    This roadmap outlines EPA’s plans to build upon the Agency’s commitment to transparency & stakeholder engagement coordinated during the development of the Hydraulic Fracturing (HF) Study Plan & will help inform the 2014 HF study draft assessment report.

  9. It's Time to Develop a New "Draft Test Protocol" for a Mars Sample Return Mission (or Two…).

    PubMed

    Rummel, John D; Kminek, Gerhard

    2018-04-01

    The last time NASA envisioned a sample return mission from Mars, the development of a protocol to support the analysis of the samples in a containment facility resulted in a "Draft Test Protocol" that outlined required preparations "for the safe receiving, handling, testing, distributing, and archiving of martian materials here on Earth" (Rummel et al., 2002 ). This document comprised a specific protocol to be used to conduct a biohazard test for a returned martian sample, following the recommendations of the Space Studies Board of the US National Academy of Sciences. Given the planned launch of a sample-collecting and sample-caching rover (Mars 2020) in 2 years' time, and with a sample return planned for the end of the next decade, it is time to revisit the Draft Test Protocol to develop a sample analysis and biohazard test plan to meet the needs of these future missions. Key Words: Biohazard detection-Mars sample analysis-Sample receiving facility-Protocol-New analytical techniques-Robotic sample handling. Astrobiology 18, 377-380.

  10. 76 FR 39103 - Science Advisory Board Staff Office Notification of a Public Teleconference of the Air Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... draft plans for Photochemical Assessment Monitoring Stations (PAMS) Network Re-engineering. DATES: A... information concerning the EPA CASAC can be found at the EPA CASAC Web site at http://www.epa.gov/casac . Any inquiry regarding EPA's draft plans for PAMS Network Re-engineering should be directed to Mr. Kevin...

  11. 76 FR 22720 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2011-N073;10120-1113-0000-C2] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl--Appendix C AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document availability; reopening...

  12. 78 FR 76852 - Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNML00000 L16100000.DS0000] Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In...

  13. Response to the Articles on the Draft 2010 National Educational Technology Plan

    ERIC Educational Resources Information Center

    Atkins, Dan; Bennett, John; Brown, John Seely; Dede, Chris; Fishman, Barry; Means, Barbara, Pea, Roy; Thille, Candace; Williams, Brenda

    2011-01-01

    As people who were involved with drafting the 2010 National Educational Technology Plan (NETP), the authors have taken the opportunity to respond to the very interesting perspectives in this special issue. The thoughts here represent only their views and are not an official statement of either the US Department of Education or the NETP Technical…

  14. 78 FR 17714 - Notice of Availability of the HiLine District Draft Resource Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... (1988) and Sweet Grass Hills Amendment (1996) and Judith-Valley-Phillips Resource Management Plans (1994..., Kevin Rim, Mountain Plover, Prairie Dog Towns within the 7km Complex, and Sweet Grass Hills; these ACEC... Restrictions: Avoidance area for rights-of-way. Sweet Grass Hills ACEC (7,419 Acres) Relevant and Important...

  15. 77 FR 42758 - Notice of Availability of the Prehistoric Trackways National Monument Draft Resource Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended, and the... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the...

  16. 77 FR 74196 - Draft Guidance for Industry on Safety Considerations for Product Design To Minimize Medication...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... document, which addresses safety achieved through drug product design, is the first in a series of planned...] Draft Guidance for Industry on Safety Considerations for Product Design To Minimize Medication Errors... Considerations for Product Design to Minimize Medication Errors.'' The draft guidance provides sponsors of...

  17. Silk Purse from a Sow's Ear? Why Knowledge Matters and Why the Draft History NC Will Not Improve It

    ERIC Educational Resources Information Center

    Hall, Katie; Counsell, Christine

    2013-01-01

    Katie Hall and Christine Counsell attempt to construct a Key Stage 3 scheme of work out of the draft National Curriculum for history that was released for consultation in England in February 2013. They explain the process by which they attempted to convert the programme of study into a coherent, workable plan that would fulfil the stated aims.…

  18. 77 FR 30319 - Draft Environmental Impact Statement for General Management Plan, Fort Pulaski National Monument, GA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... Environmental Impact Statement (DEIS) for the General Management Plan (GMP) and Wilderness Study for Fort... of the monument, the DEIS/GMP/Wilderness Study describes three alternatives including the NPS... and enjoyment of the monument's resources. An up-to-date GMP is needed to address how visitors access...

  19. Genetic analysis of the Hungarian draft horse population using partial mitochondrial DNA D-loop sequencing.

    PubMed

    Csizmár, Nikolett; Mihók, Sándor; Jávor, András; Kusza, Szilvia

    2018-01-01

    The Hungarian draft is a horse breed with a recent mixed ancestry created in the 1920s by crossing local mares with draught horses imported from France and Belgium. The interest in its conservation and characterization has increased over the last few years. The aim of this work is to contribute to the characterization of the endangered Hungarian heavy draft horse populations in order to obtain useful information to implement conservation strategies for these genetic stocks. To genetically characterize the breed and to set up the basis for a conservation program, in the present study a hypervariable region of the mitochrondial DNA (D-loop) was used to assess genetic diversity in Hungarian draft horses. Two hundred and eighty five sequences obtained in our laboratory and 419 downloaded sequences available from Genbank were analyzed. One hundred and sixty-four haplotypes and thirty-six polymorphic sites were observed. High haplotype and nucleotide diversity values ( H d  = 0.954 ± 0.004; π  = 0.028 ± 0.0004) were identified in Hungarian population, although they were higher within than among the different populations ( H d  = 0.972 ± 0.002; π  = 0.03097 ± 0.002). Fourteen of the previously observed seventeen haplogroups were detected. Our samples showed a large intra- and interbreed variation. There was no clear clustering on the median joining network figure. The overall information collected in this work led us to consider that the genetic scenario observed for Hungarian draft breed is more likely the result of contributions from 'ancestrally' different genetic backgrounds. This study could contribute to the development of a breeding plan for Hungarian draft horses and help to formulate a genetic conservation plan, avoiding inbreeding while.

  20. 78 FR 36566 - Endangered and Threatened Wildlife and Plants; Technical Agency Draft Recovery Plan for Golden Sedge

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... considered for removal from the List of Endangered and Threatened Species (delisting) when: 1. There are 15... species will be reviewed and it will be considered for reclassification or removal from the Federal List... draft recovery plan for the endangered golden sedge, a species endemic to the coastal plain in North...

  1. 75 FR 14623 - Notice of Availability of the Draft Imperial Sand Dunes Recreation Area Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... Concern (ACEC), Plank Road and East Mesa. The preferred alternative would continue the 298-acre Plank Road... preferred alternative would reduce the East Mesa ACEC from 6,454 acres to 5,799 acres, which overlaps the Planning Area. The East Mesa ACEC would continue to protect biological resources and other resource values...

  2. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 5: Human Support

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft integrated technology plan (ITP) on human support are included. Topics covered include: human support program; human factors; life support technology; fire safety; medical support technology; advanced refrigeration technology; EVA suit system; advanced PLSS technology; and ARC-EVA systems research program.

  3. 77 FR 7174 - Correction Notice for Deepwater Horizon Oil Spill; Draft Phase I Early Restoration Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-FHC-2012-N030; FVHC98130406900Y4-XXX-FF04G01000] Correction Notice for Deepwater Horizon Oil Spill; Draft Phase I Early Restoration Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability and request...

  4. Integrating Clinical Practice Guidelines into Daily Practice: Impact of an Interactive Workshop on Drafting of a Written Action Plan for Asthma Patients

    ERIC Educational Resources Information Center

    Labelle, Martin; Beaulieu, Michele; Renzi, Paolo; Rahme, Elham; Thivierge, Robert L.

    2004-01-01

    Introduction: Written action plans (WAPs) are instructions that enable asthmatics to manage their condition appropriately and are recommended by current asthma clinical practice guidelines (CPGs). However, general practitioners (GPs) rarely draft WAPs for their patients. An interactive, case-based workshop for asthma, combined with an objective…

  5. 77 FR 27478 - Notice of Availability of the Draft Environmental Impact Statement and Draft Proposed California...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ...In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) has prepared a Draft Proposed California Desert Conservation Area (CDCA) Plan Amendment and a Draft Environmental Impact Statement (EIS) for the Haiwee Geothermal Leasing Area (HGLA), Inyo County, California, and by this notice is announcing the opening of the comment period.

  6. 78 FR 20690 - Draft Environmental Impact Statement, Draft Habitat Conservation Plan, Draft Programmatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    .... Background The Fowler Ridge application is unusual in that 355 wind turbines are already in place and have... turbines under Phase IV and operate a maximum of 449 wind turbines and associated facilities (described below) for a period of 22 years in Benton County, Indiana. The project will consist of wind turbines...

  7. 75 FR 27838 - Notice of Availability of Draft NUREG-1800, Revision 2; “Standard Review Plan for Review of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... Draft NUREG-1801, Revision 2; ``Generic Aging Lessons Learned (GALL) Report'' AGENCY: Nuclear Regulatory... Applications for Nuclear Power Plants ''and draft NUREG-1801, ``Generic Aging Lessons Learned (GALL) Report... Power Plants'' (SRP-LR); and the revised NUREG-1801, ``Generic Aging Lessons Learned (GALL) Report'' for...

  8. 75 FR 30849 - Notice of Availability of Draft General Management Plan/Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... Impact Statement (GMP/EIS) for Lincoln Home National Historic Site, Illinois. DATES: The draft GMP/EIS... meetings will be held during the 60-day review period on the GMP/EIS in Springfield, Illinois, in summer... the draft GMP/EIS are available from the Superintendent, 413 South Eighth Street, Springfield...

  9. 77 FR 75622 - Intent To Prepare a Draft Supplemental Environmental Impact Statement for Development of a Long...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Intent To Prepare a Draft Supplemental Environmental Impact Statement for Development of a Long-Term Sediment Management Plan of the... draft and final SEIS. b. Significant issues to be analyzed in depth in the DSEIS include alternatives...

  10. 78 FR 32237 - Draft Initial Comprehensive Plan and Draft Programmatic Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ... Resources and Ecosystems Sustainability, Tourist Opportunities, and Revived Economies of the Gulf States Act..., Congress passed and the President signed the Resources and Ecosystems Sustainability, Tourist Opportunities...

  11. 76 FR 30956 - Outer Continental Shelf, Alaska OCS Region, Chukchi Sea Planning Area, Oil and Gas Lease Sale 193

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... Continental Shelf, Alaska OCS Region, Chukchi Sea Planning Area, Oil and Gas Lease Sale 193 AGENCY: Bureau of...: BOEMRE announces the availability of a Revised Draft SEIS, OCS Oil and Gas Lease Sale 193, Chukchi Sea.... The Revised Draft SEIS augments the analysis of the Final EIS, Oil and Gas Lease Sale 193, Chukchi Sea...

  12. 78 FR 26616 - Draft NOAA Five Year Research and Development Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... understanding among NOAA's leadership, workforce, partners, constituents, and Congress on how the agency's R&D... learn from its experiences. ADDRESSES: The draft can be found at http://nrc.noaa.gov/CouncilProducts...

  13. 76 FR 52008 - Keālia Pond National Wildlife Refuge (NWR) and Kakahai'a NWR, Maui County, HI; Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ...[amacr]lia Pond National Wildlife Refuge (NWR) and Kakahai'a NWR, Maui County, HI; Draft Comprehensive... open house meetings in K[imacr]hei and Kaunakakai, HI. In Planning Update 2, released in February 2010..., Mokulele Highway, K[imacr]hei, HI. The Draft CCPs/EAs are also available for downloading on our Web site...

  14. 78 FR 46925 - Western Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... Commercial Dock Development Study A. Contract and Project Status B. Overview of draft Dock Development Plan.... Land-side support facilities a. Outer Cove Mariana b. Puerto Rico Dump c. Echo Dock d. Sea Plan Ramp iv. Environmental Consideration and Permits v. Discussion on Preferred Site Location C. Evaluation of Preliminary...

  15. EPA's Science Plan for Activities Related to Dioxins in the ...

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency is currently addressing several issues related to dioxins and dioxin-like chemicals in the environment. These include the comprehensive human health and exposure assessment for dioxin, commonly called the dioxin reassessment and a review of dioxin soil clean-up levels currently in use across the United States. To move forward with both of these efforts, as well as other dioxin related activities, a plan with interim milestones has been developed and it is outlined below. EPA’sExposure and Human Health Reassessment of 2,3,7,8-Tetrachlorodibenzo-p-Dioxin(TCDD) and Related Compounds; Response to NAS and Completion of Dioxin Reassessment 1. EPA will release a draft report that responds to the recommendations and comments included in the National Academy of Sciences’ (NAS) 2006 review of EPA’s 2003 draft dioxin reassessment. UPDATED May 21, 2010: The draft response to comments report titled EPA’s Reanalysis of Key Issues Related to Dioxin Toxicity and Response to NAS Comments (External Review Draft) (“Draft Dioxin Reanalysis”) was completed and released for public review and comment on May 21, 2010. EPA’s National Center for Environment Assessment (NCEA) in the Office of Research and Development, will prepare a limited response to key comments and recommendations in the NAS report (draft response to comments report). The draft response will focus on dose-response

  16. 77 FR 55222 - Notice of Availability of the Draft Resource Management Plan Amendment and the Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... development (e.g., year-round drilling instead of timing limitations if development does not exceed a particular threshold) and emphasizes conservation and protection of other resources by limiting the duration...

  17. 40 CFR 60.1085 - What must I do with any public comments I receive during the public comment period on my draft...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What must I do with any public comments I receive during the public comment period on my draft materials separation plan? 60.1085 Section 60... What must I do with any public comments I receive during the public comment period on my draft...

  18. 40 CFR 60.1085 - What must I do with any public comments I receive during the public comment period on my draft...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What must I do with any public comments I receive during the public comment period on my draft materials separation plan? 60.1085 Section 60... What must I do with any public comments I receive during the public comment period on my draft...

  19. 40 CFR 60.1085 - What must I do with any public comments I receive during the public comment period on my draft...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What must I do with any public comments I receive during the public comment period on my draft materials separation plan? 60.1085 Section 60... What must I do with any public comments I receive during the public comment period on my draft...

  20. 40 CFR 60.1085 - What must I do with any public comments I receive during the public comment period on my draft...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What must I do with any public comments I receive during the public comment period on my draft materials separation plan? 60.1085 Section 60... What must I do with any public comments I receive during the public comment period on my draft...

  1. 40 CFR 60.1085 - What must I do with any public comments I receive during the public comment period on my draft...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What must I do with any public comments I receive during the public comment period on my draft materials separation plan? 60.1085 Section 60... What must I do with any public comments I receive during the public comment period on my draft...

  2. Genetic analysis of the Hungarian draft horse population using partial mitochondrial DNA D-loop sequencing

    PubMed Central

    2018-01-01

    Background The Hungarian draft is a horse breed with a recent mixed ancestry created in the 1920s by crossing local mares with draught horses imported from France and Belgium. The interest in its conservation and characterization has increased over the last few years. The aim of this work is to contribute to the characterization of the endangered Hungarian heavy draft horse populations in order to obtain useful information to implement conservation strategies for these genetic stocks. Methods To genetically characterize the breed and to set up the basis for a conservation program, in the present study a hypervariable region of the mitochrondial DNA (D-loop) was used to assess genetic diversity in Hungarian draft horses. Two hundred and eighty five sequences obtained in our laboratory and 419 downloaded sequences available from Genbank were analyzed. Results One hundred and sixty-four haplotypes and thirty-six polymorphic sites were observed. High haplotype and nucleotide diversity values (Hd = 0.954 ± 0.004; π = 0.028 ± 0.0004) were identified in Hungarian population, although they were higher within than among the different populations (Hd = 0.972 ± 0.002; π = 0.03097 ± 0.002). Fourteen of the previously observed seventeen haplogroups were detected. Discussion Our samples showed a large intra- and interbreed variation. There was no clear clustering on the median joining network figure. The overall information collected in this work led us to consider that the genetic scenario observed for Hungarian draft breed is more likely the result of contributions from ‘ancestrally’ different genetic backgrounds. This study could contribute to the development of a breeding plan for Hungarian draft horses and help to formulate a genetic conservation plan, avoiding inbreeding while. PMID:29404201

  3. Fiscal year 1981 US corn and soybeans pilot preliminary experiment plan, phase 1

    NASA Technical Reports Server (NTRS)

    Livingston, G. P.; Nedelman, K. S.; Norwood, D. F.; Smith, J. H. (Principal Investigator)

    1981-01-01

    A draft of the preliminary experiment plan for the foreign commodity production forecasting project fiscal year 1981 is presented. This draft plan includes: definition of the phase 1 and 2 U.S. pilot objectives; the proposed experiment design to evaluate crop calendar, area estimation, and area aggregation components for corn and soybean technologies using 1978/1979 crop-year data; a description of individual sensitivity evaluations of the baseline corn and soybean segment classification procedure; and technology and data assessment in support of the corn and soybean estimation technology for use in the U.S. central corn belt.

  4. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 3: Space power and thermal management

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the SSTAC/ARTS review of the draft integrated technology plan on thermal power and thermal management are presented. Topics covered include: space energy conversion research and technology; space photovoltaic energy conversion; chemical energy conversion and storage; thermal energy conversion; power management; thermal management; space nuclear power; high capacity power; surface power and thermal management; space platforms power and thermal management; and project SELENE.

  5. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 3: Space power and thermal management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Viewgraphs of briefings from the SSTAC/ARTS review of the draft integrated technology plan on thermal power and thermal management are presented. Topics covered include: space energy conversion research and technology; space photovoltaic energy conversion; chemical energy conversion and storage; thermal energy conversion; power management; thermal management; space nuclear power; high capacity power; surface power and thermal management; space platforms power and thermal management; and project SELENE.

  6. Proceedings of Conference XVIII: a workshop on "Continuing actions to reduce losses from earthquakes in the Mississippi Valley area," 24-26 May, 1982, St. Louis, Missouri

    USGS Publications Warehouse

    Gori, Paula L.; Hays, Walter W.; Kitzmiller, Carla

    1983-01-01

    payoff and trre lowest cost and effort requirements. These action plans, which identify steps that can be undertaken immediately to reduce losses from earthquakes in each of the seven States in the Mississippi Valley area, are contained in this report. The draft 5-year plan for the Central United States, prepared in the Knoxville workshop, was the starting point of the small group discussions in the St. Louis workshop which lead to the action plans contained in this report. For completeness, the draft 5-year plan for the Central United States is reproduced as Appendix B.

  7. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... the General Management Plan (GMP) and East Everglades Wilderness Study (EEWS) for Everglades National Park (park). After it is finalized, the GMP/EEWS will guide the management of the park over the next 20... visitor use in the Park. The GMP will provide updated management direction for the entire park. The EEWS...

  8. 78 FR 70571 - Notice of Availability of the Oregon Greater Sage-Grouse Draft Land Use Plan Amendments and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ...)--Areas identified as having the highest conservation value for maintaining sustainable GRSG populations... the Federal Register (76 FR 77008) and ended on March 23, 2012. The BLM held scoping open houses in...

  9. 75 FR 27708 - Stanford University Habitat Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration DEPARTMENT OF THE INTERIOR Fish and Wildlife Service RIN 0648-XV36 Stanford University Habitat Conservation Plan AGENCIES... University Habitat Conservation Plan (Plan), the Draft Environmental Impact Statement (DEIS) for...

  10. Camp Minden Draft QASP and Work Plan for Public Feedback

    EPA Pesticide Factsheets

    ESI has developed these operational plans, technical approaches, and related required resources based upon extensive review and planning for material removal, transportation, staging, and Contained Burn Chamber (CBC) destruction of materials.

  11. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ...On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (``National Ocean Policy''). The National Ocean Policy provides an implementation strategy, which describes nine priority objectives that seek to address some of the most pressing challenges facing the ocean, our coasts, and the Great Lakes. The National Ocean Council is responsible for developing strategic action plans for each of the nine priority objectives. As a first step, Federal interagency writing teams have developed content outlines for each draft strategic action plan. The NOC is seeking public review and comment of these content outlines. The purpose of the draft content outlines (outlines) is to provide the public with an initial view of potential actions that could be taken to further the national priority objectives. As such, they are an interim step toward development of the first full draft of each strategic action plan. In developing the outlines, the writing teams were informed by the comments received during an initial public scoping period that closed on April 29. Each outline presents in bulleted form potential actions to further the particular priority objective. It describes the reasons for taking the action, expected outcomes and milestones, gaps and needs in science and technology, and the timeframe for completing the action. The outlines also provide an overview of the priority objective, greater context for the strategic action plan in implementing the National Ocean Policy, and an overview of the preparation of the plan . Public comments received on the outlines will be collated and posted on the NOC Web site. The comments on the outlines will inform the preparation of full draft strategic action plans, which will be released for public review in the fall of 2011, allowing additional opportunity for the public to provide comments. Final strategic action plans are expected to be completed by early 2012.

  12. 77 FR 42756 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Incidental Take of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ...), including the endangered fountain darter (Etheostoma fonticola), threatened San Marcos salamander (Eurycea nana), endangered San Marcos gambusia (Gambusia georgei), endangered Texas blind salamander...), Comal Springs salamander (Eurycea sp.), and Texas troglobitic water slater (Lirceolus smithii) in case...

  13. Draft Permit & Supporting Documentation for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    EPA Pesticide Factsheets

    List of draft permit & supporting documentation for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  14. Architectural Drafting. Curriculum Development. Bulletin 1779.

    ERIC Educational Resources Information Center

    Eppler, Thomas

    This teaching guide is designed to aid high school vocational education teachers in teaching a course in architectural drafting for students who plan to become architects, interior designers and decorators, architectural draftspersons, landscape engineers, building contractors, building estimators, real estate persons or appraisers, and others.…

  15. Community Solutions for Stormwater Management: A Guide for Voluntary Long-Term Planning

    EPA Pesticide Factsheets

    This draft guide describes how to develop a comprehensive long-term community stormwater plan that integrates stormwater management with communities’ broader plans for economic development, infrastructure investment and environmental compliance.

  16. Annual Plan - Fiscal Year 2009

    EPA Pesticide Factsheets

    Includes Strategic Plan Update and Draft Plans for Oversight of the American Recovery and Reinvestment Act of 2009 Based Upon the Enterprise Risk Management Integrated Framework Model Developed by the Committee of Sponsoring Orgs of the Treadway Commission

  17. Ocean research plan reviewed

    NASA Astrophysics Data System (ADS)

    Zielinski, Sarah

    A draft plan setting out priorities for U.S. ocean research generally was lauded for its clear and well-articulated view in a recent report from a committee of the U.S. National Research Council (NRC) of the US. National Academies. However, the committee advised that the plan would benefit from a bold vision for the future of ocean science research, additional details, and a reorganization to include cross-cutting research.The draft "Charting the Course for Ocean Science in the United States: Research Priorities for the Next Decade" was made available for public comment in September 2006 by the U.S. National Science and Technology Council's Joint Subcommittee on Ocean Science and Technology.

  18. 40 CFR 60.57b - Siting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...)(1)(ii) of this section. (i) The owner or operator shall distribute the preliminary draft materials... amount of waste generation anticipated for the service area. (C) The types and estimated amounts of... operator shall distribute the siting analysis and final draft materials separation plan to the principal...

  19. 40 CFR 60.57b - Siting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...)(1)(ii) of this section. (i) The owner or operator shall distribute the preliminary draft materials... amount of waste generation anticipated for the service area. (C) The types and estimated amounts of... operator shall distribute the siting analysis and final draft materials separation plan to the principal...

  20. 40 CFR 60.57b - Siting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...)(1)(ii) of this section. (i) The owner or operator shall distribute the preliminary draft materials... amount of waste generation anticipated for the service area. (C) The types and estimated amounts of... operator shall distribute the siting analysis and final draft materials separation plan to the principal...

  1. 40 CFR 60.57b - Siting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...)(1)(ii) of this section. (i) The owner or operator shall distribute the preliminary draft materials... amount of waste generation anticipated for the service area. (C) The types and estimated amounts of... operator shall distribute the siting analysis and final draft materials separation plan to the principal...

  2. Producibility Engineering and Planning (PEP)

    DTIC Science & Technology

    1977-01-01

    Materiel System, May 1976. c. Cesare Raimondi, "Estimating Drafting Time - Art , Science , Guess- work", Machine Design, 7 September 1972. d. Current Wage...Comprehensive 8 16 24 32 40 86 45 70 90 80 1/ Cesare Raimondi, "Estimating Drafting Time- Art , Science , Guesswork," Machine Design, September

  3. 77 FR 3545 - Notice of Availability of the Draft Program Environmental Impact Report (PEIR): Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-24

    ... transportation and urban form strategies that encourage compact growth, increased jobs/housing balance and... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Availability of the Draft... California Environmental Quality Act for the 2012-2035 Regional Transportation Plan and Sustainable...

  4. 40 CFR 124.8 - Fact sheet.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS PROCEDURES FOR... draft permit for a major HWM, UIC, 404, or NPDES facility or activity, for every Class I sludge... that includes a sewage sludge land application plan under 40 CFR 501.15(a)(2)(ix), and for every draft...

  5. 78 FR 16523 - Deer Flat National Wildlife Refuge, Canyon, Payette, Owyhee, and Washington Counties, ID, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ..., OR; Draft Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and.... Fish and Wildlife Service (Service), announce the availability of a draft comprehensive conservation... principles of fish and wildlife management, conservation, legal mandates, and Refuge System policies. In...

  6. Working draft of the FDA GMP final rule (Part I).

    PubMed

    Donawa, M E

    1995-10-01

    On 24 July 1995, the US Food and Drug Administration (FDA) published a notice of availability of a working draft of a final rule for new good manufacturing practice (GMP) regulations for medical devices. The new regulations could be in force by late 1996. This is the first of a two-part series of articles discussing key provisions of the working draft and their importance to companies marketing or planning to market devices in the US.

  7. 78 FR 54949 - Major Project Financial Plan Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

  8. 76 FR 77431 - Decommissioning Planning During Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... (DG) DG-4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the.... The draft regulatory guide entitled, ``Decommissioning Planning During Operations,'' is temporarily..., 40, 50, 70, and 72 RIN 3150-AI55 [NRC-2011-0286; NRC-2008-0030] Decommissioning Planning During...

  9. 77 FR 41444 - Notice of Availability of the Draft Resource Management Plan and Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ...). This ACEC would be managed for scenic, cultural, geologic, and rare plant values. Proposed resource-use... ACEC would be managed for rare plants and paleontological resources. Proposed resource-use limitations... be managed for paleontological, geologic, scenic, special status plants, riparian, and cultural...

  10. 76 FR 38414 - James Campbell National Wildlife Refuge, Honolulu County, HI; Draft Comprehensive Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ...] James Campbell National Wildlife Refuge, Honolulu County, HI; Draft Comprehensive Conservation Plan and...`iwa, HI 96712. FOR FURTHER INFORMATION CONTACT: David Ellis, Project Leader, (808) 637-6330...`ahu National Wildlife Refuge Complex, 66-590 Kamehameha Highway, Room 2C, Hale`iwa, HI 96712. The...

  11. 78 FR 73555 - Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early Restoration Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ...-making. U.S. Environmental Protection Agency (USEPA); State of Louisiana Coastal Protection and... of Alabama; State of Florida Department of Environmental Protection and Fish and Wildlife... Coastal and Marine Resources, and (2) Contribute to Providing and Enhancing Recreational Opportunities...

  12. 77 FR 76035 - Office of Environmental Information; Announcement of Availability and Comment Period for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ...) Organizations and two associated draft QA Handbooks; 1) draft Handbook for Preparing Quality Management Plans... Data Collection, Production, and Use by Non-EPA (External) Organizations and two associated QA Handbooks AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability & request for...

  13. AIR QUALITY CRITERIA FOR PARTICULATE MATTER DOCUMENT

    EPA Science Inventory

    A Planning Document was produced by NCEA/RTP and reviewed by the Clean Air Scientific Advisory Committee (CASAC) (62 FR 55201, October 23, 1997). In FY99, a workshop draft of the PM AQCD was completed, a peer input workshop held, and an External Review Draft released for public ...

  14. 76 FR 51394 - DRAFT General Management Plan and Draft Environmental Impact Statement, Biscayne National Park, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... days, starting from the date the Environmental Protection Agency publishes this Notice of Availability... make submissions from organizations or businesses, and from individuals identifying themselves as representatives of or officials of organizations or businesses, available for public inspection in their entirety...

  15. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... . Persons who use a telecommunications device for the deaf (TDD) may call the Federal Information Relay... portions of five highly urbanized southern California counties: San Diego, Riverside, San Bernardino... Concern (ACEC), sensitive species and other wildlife habitat, lands with wilderness characteristics...

  16. Arizona watershed framework in the Verde River watershed

    Treesearch

    Ren Northrup

    2000-01-01

    The Arizona Department of Environmental Quality, Water Quality Division drafted a six-step approach to guide its staff and local participants in developing and implementing watershed management plans. From January 1999 through June 2000, the draft Arizona Statewide Watershed Framework will be tested in Arizona's Verde River watershed. This concept proofing...

  17. 78 FR 70960 - Utah Resource Advisory Council Meeting/Conference Call

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ... the teleconference, or submit written material for the RAC to consider during the teleconference... close of business, Monday, Jan. 6, 2014. SUPPLEMENTARY INFORMATION: The Utah RAC will elect officers for... Draft Land Use Plan Amendment and Environmental Impact Statement and to submit a draft comment letter to...

  18. 78 FR 4150 - Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ...; NIOSH-134-B] Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance AGENCY: National... Nanotechnology Strategic Plan for Research and Guidance. SUMMARY: The National Institute for Occupational Safety... NIOSH FY2013-FY2016 nanotechnology strategic plan. This draft strategic plan (Protecting the...

  19. 29 CFR 1952.100 - Description of the plan as initially approved.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.100 Description of the plan as initially approved. (a)(1) The plan identifies the Oregon Workmen's.... (b)(1) The plan includes proposed draft legislation to be considered by the Oregon Legislature during...

  20. 29 CFR 1952.100 - Description of the plan as initially approved.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.100 Description of the plan as initially approved. (a)(1) The plan identifies the Oregon Workmen's.... (b)(1) The plan includes proposed draft legislation to be considered by the Oregon Legislature during...

  1. 75 FR 80850 - Development of Strategic Plan 2011-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... intended for use as LSC embarks on its planning process. LSC anticipates publishing a draft Strategic Plan... process to develop a Strategic Plan for the years 2011-2015. Toward that end, LSC is soliciting... strategic planning efforts. In addition, Among other sources, LSC is considering the guidance provided by...

  2. 78 FR 69462 - National Nanotechnology Initiative Strategic Plan; National Science and Technology Council...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... OFFICE OF SCIENCE AND TECHNOLOGY POLICY OFFICE National Nanotechnology Initiative Strategic Plan; National Science and Technology Council; National Nanotechnology Coordination Office AGENCY: Executive... Nanotechnology Initiative (NNI) Strategic Plan. The draft plan will be posted at www.nano.gov/2014strategy...

  3. Strategic planning for skills and simulation labs in colleges of nursing.

    PubMed

    Gantt, Laura T

    2010-01-01

    While simulation laboratories for clinical nursing education are predicted to grow, budget cuts may threaten these programs. One of the ways to develop a new lab, as well as to keep an existing one on track, is to develop and regularly update a strategic plan. The process of planning not only helps keep the lab faculty and staff apprised of the challenges to be faced, but it also helps to keep senior level management engaged by reason of the need for their input and approval of the plan. The strategic planning documents drafted by those who supervised the development of the new building and Concepts Integration Labs (CILs) helped guide and orient faculty and other personnel hired to implement the plan and fulfill the vision. As the CILs strategic plan was formalized, the draft plans, including the SWOT analysis, were reviewed to provide historical perspective, stimulate discussion, and to make sure old or potential mistakes were not repeated.

  4. Deadline Extended for Public Comment on IOOS' Draft Plan for Data Management andCommunications Component

    NASA Astrophysics Data System (ADS)

    The U.S. Integrated Ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and Communications (DMAC∥ component. The deadline for receipt of comments has been extended to 18 November 2003. The plan can be found at http://www.dmac.ocean.us/dacsc/imp_plan.jsp. The plan was developed by the DMAC Steering Committee, which includes representatives from federal and state agencies, private industry, and academia. This committee was tasked by Ocean.US (the national office for IOOS) with the preparation of a detailed, phased DMAC implementation plan, and initial oversight of its implementation. The scope of the plan includes the IOOS DMAC infrastructure, data archive and access, and basic information products needed for assessing the availability and quality of data within IOOS. Four expert teams (Data Transport, Metadata and Data Discovery, Data Archive and Access, Applications and Products), and two outreach teams (Data Facilities Management, and User Outreach), were assembled to assist in developing material for the plan.

  5. State Network Utilization Study: Mississippi Educational Television.

    ERIC Educational Resources Information Center

    Wilson, Savan; And Others

    This document is the result of a utilization study of Mississippi Educational Television where 27 target audiences were identified and surveyed. The following information is included: a draft of and updated state network utilization studies; planning and management strategies; a profile of the survey populations; a distance learning survey report;…

  6. 18 CFR 5.16 - Preliminary licensing proposal.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... its studies conducted under the approved study plan. (c) A potential applicant may elect to file a... application must include notice of its intent to do so in the updated study report required by § 5.15(f). (d... draft application, which may include recommendations on whether the Commission should prepare an...

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Thom, Ronald M.; Whiting, Allan H.

    The Bonneville Power Administration (BPA), in coordination with the U. S. Army Corps of Engineers (COE) and NOAA Fisheries, originated this project (BPA Project No. 2002-076; Contract No. DE-AC06-76RL01830, Release No. 652-24). Their intent was to develop a useful habitat restoration plan for the lower Columbia River and estuary to help guide restoration efforts and fulfill Reasonable and Prudent Alternative Action 159 of the 2000 National Marine Fisheries Service Biological Opinion on operation of the Federal Columbia River Power System. This document focuses on salmon habitat, although its ecosystem-based approach necessarily affects other species as well. Salmon habitat restoration ismore » best undertaken within the context of other biota and physical processes using an ecosystem perspective. The anticipated audience for the plan includes entities responsible for, interested in, or affected by habitat restoration in the lower Columbia River and estuary. Timeframes to apply this plan extend from the immediate (2003-2004) to the near-term (2005-2006) to the long-term (2007 and beyond). We anticipate and encourage that the plan be revised as new knowledge and experience are attained. A team comprised of the Columbia River Estuary Study Taskforce (CREST), the Lower Columbia River Estuary Partnership (Estuary Partnership), and Pacific Northwest National Laboratory (PNNL) wrote this document. The BPA and the COE, as the responsible Action Agencies, provided technical oversight. The Estuary Partnership's Science Work Group, NOAA Fisheries Habitat Conservation Division, Northwest Power Planning Council (NPPC) staff, and state and tribal fisheries management agencies reviewed drafts. The Independent Scientific Advisory Board of the NPPC reviewed and commented on the 90% draft. Revisions were incorporated into the final draft document subsequently released for public review. Extensive efforts were made to ensure a sound technical and policy basis and to solicit input from all interested parties.« less

  8. Restoration Planning | NOAA Gulf Spill Restoration

    Science.gov Websites

    Mexico. Since then, we have worked with the public and BP to identify and implement early restoration restoration plan for the Gulf of Mexico and took public comments on the draft plan through December 4, 2015

  9. 77 FR 14047 - Guidance for Decommissioning Planning During Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...

  10. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 8: Aerothermodynamics Automation and Robotics (A/R) systems sensors, high-temperature superconductivity

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity.

  11. Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mayhorn, Ebony T.; Sullivan, Greg P.; Petersen, Joseph M.

    2015-09-29

    This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.

  12. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 8: Aerothermodynamics Automation and Robotics (A/R) systems sensors, high-temperature superconductivity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity.

  13. 76 FR 55941 - Notice of Availability of the Draft Bakersfield Resource Management Plan and Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ...): Relevant values for this newly proposed ACEC are special status plant species and rare plant communities... proposed ACEC are special status plant species and rare plant community. Proposed limitations address land..., special status species (wildlife and plants), and plant community. Proposed limitations address land use...

  14. 78 FR 2425 - Notice of Availability of a Supplement to the Eastern Interior Draft Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ....html . Fax: 907-474-2282. Mail: Eastern Interior Field Office, Attention--Eastern Interior Draft RMP... opening about 44 percent of the NRA to hardrock mineral leasing. This decision was never implemented. The... Alternative D to include hardrock mineral leasing. This alternative would recommend making approximately 160...

  15. 78 FR 5486 - Notice of Availability of the Draft Resource Management Plan and Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... hearings and any other public participation activities at least 15 days in advance through public notices... achieved by sustaining relatively unmodified physical landscapes and natural and cultural resource values... and importance values. Badger Wash, up to 2,200 acres, Alternatives A, B, C and D: No surface...

  16. 78 FR 24211 - Draft Guidance for Industry on Safety Considerations for Container Labels and Carton Labeling...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... container labels and carton labeling design, is the second in a series of three planned guidance documents...] Draft Guidance for Industry on Safety Considerations for Container Labels and Carton Labeling Design To... entitled ``Safety Considerations for Container Labels and Carton Labeling Design to Minimize Medication...

  17. 78 FR 5494 - Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMR-LAMR-10224; 2310-0091-422] Off-Road... Service (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the Off- Road Vehicle... impacts of four alternatives that address off-road vehicle (ORV) management in the national recreation...

  18. 77 FR 11154 - Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... BLM will announce future meetings or hearings and any other public participation activities at least..., Attention--Eastern Interior Draft RMP/EIS, Bureau of Land Management, 1150 University Avenue, Fairbanks... interior Alaska and is divided into four geographic areas: The Fortymile, Steese, Upper Black River, and...

  19. 76 FR 19784 - Notice of Availability of the Draft Environmental Impact Statement and Draft Resource Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... generation facility capable of generating up to 425 megawatts (MW) of electricity. Up to 170 wind turbines..., eliminating turbines from areas of VRM Class II, precluding construction and maintenance activities during... Amendment to the 1987 Jarbidge Resource Management Plan for the Proposed China Mountain Wind Project AGENCY...

  20. 76 FR 40390 - Notice of Availability of a Draft Land Use Plan Amendment, Environmental Impact Statement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ..., 474 megawatt (MW) wind energy project including 158 wind turbine generators, a substation... Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Project...

  1. 76 FR 52966 - Kawailoa Wind Energy Generation Facility, Oahu, HI; Draft Habitat Conservation Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    .... The proposed facility will consist of 30 wind turbine generators (WTGs), a maintenance building, an... sandvicensis), and Hawaiian hoary bat, which have collided with the wind turbine structures at this existing 30... (collisions with wind turbine generators). In addition to the anticipated take by the project, predator...

  2. 76 FR 44039 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... proposal includes 1,000 wind turbine generators (WTG) and associated infrastructure, each capable of..., operation, maintenance, and reclamation of a wind farm on public lands. The No Action Alternative would deny...) considers authorizing wind development in PCW's application area to accommodate 1,000 turbines. This...

  3. 78 FR 21965 - Notice of Availability of the Draft Tri-County Resource Management Plan and Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... wind and geothermal energy projects from aplomado falcon habitat and avoidance of wind and geothermal..., including renewable energy siting, outdoor recreation management, special status species habitat, proposals... geothermal leasing; management as VRM Class II; and limitation of vehicle use to designated routes. Brokeoff...

  4. 76 FR 69758 - Draft Environmental Assessment, Incidental Take Plan, and Application for an Incidental Take...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... local governments. DATES: Comment Period: To ensure consideration, we must receive your written comments... describes the proposed action and possible alternatives, and analyzes the effects of the alternatives on the... avoidance, minimization, and mitigation measures) and other alternatives in the draft EA are adequate to...

  5. 76 FR 80385 - Draft Environmental Impact Statement and Proposed Maricopa Sun Solar Complex Multi-Species...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...-FXES11120800000F2-123] Draft Environmental Impact Statement and Proposed Maricopa Sun Solar Complex Multi-Species... National Environmental Policy Act for the proposed Maricopa Sun Solar Complex Habitat Conservation Plan... construction, operation, and decommissioning of a 700 megawatt photo-voltaic power generating facility and...

  6. 75 FR 8105 - Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 47740, LLCAD07000, L51030000.FX0000, LVRAB109AA01] Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment...

  7. 77 FR 9694 - Notice of Availability of the Draft Environmental Impact Statement for the Restoration Design...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAZ910000.L14300000.DB0000.LXSS058A0000] Notice of Availability of the Draft Environmental Impact Statement for the Restoration Design Energy Project and Land Use Plan Amendments AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...

  8. 76 FR 53484 - Notice of Availability of the Draft Resource Management Plan/Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    .... Apache Junction Public Library, 1177 N. Idaho Road, Apache Junction, Arizona 85219. Buckeye Public Library, 310 North 6th Street, Buckeye, Arizona 85326. Casa Grande Public Library, 449 North Dry Lake, Casa Grande, Arizona 85222. Gila Bend Public Library, 202 North Euclid Avenue, Gila Bend, Arizona 85337...

  9. 77 FR 43086 - Solicitation of Written Comments on Draft Phase 3 Long-Term Care Facilities Strategy/Module for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Solicitation of Written Comments on Draft Phase 3 Long-Term Care Facilities Strategy/Module for Inclusion in the National Action Plan To Prevent Healthcare-Associated Infections: Roadmap to Elimination AGENCY: Department of Health and Human Services, Office of the...

  10. 75 FR 51755 - New England Fishery Management Council; Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-23

    ... comments on proposals to be included in the Draft Amendment 3 to the Deep Sea Red Crab Fishery Management... to [email protected] with ``Comments on Red Crab Draft Amendment 3'' in the subject line... Council proposes to take action to amend the Deep Sea Red Crab Fishery Management Plan (FMP) and to...

  11. 75 FR 74073 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... population program HexSim. Though still at preliminary draft stage, population response simulations from this portion of the modeling process are available for public review by request from our office. These simulations do not estimate what will occur in the future, but provide comparative information on potential...

  12. 76 FR 21346 - Science Advisory Board Staff Office, Notification of a Public Teleconference of the Clean Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... a Public Teleconference of the Clean Air Scientific Advisory Committee (CASAC) Lead Review Panel... (CASAC) Lead Review Panel to provide consultative advice on EPA's draft Integrated Review Plan for the National Ambient Air Quality Standards for Lead (draft IRP). DATES: The public teleconference will be held...

  13. 77 FR 47067 - Notification of Two Public Quality Review Teleconferences of the Chartered Science Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... Assessment in Environmental Decision- Making'' (EPA-SAB-08-002). Background information about this advisory... ecological assessment action plan and (2) an SAB draft review report on EPA's accounting framework for... ``SAB Review (7-26-12 Draft) of EPA's Accounting Framework for Biogenic CO 2 Emissions from Stationary...

  14. Drafting. Technology Learning Activity. Teacher Edition. Technology Education Series.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This packet of technology learning activity (TLA) materials for drafting for students in grades 6-10 consists of an instructor's section and student materials. The instructor's section contains background information, suggested activities, and a list of suggested resources. A lesson plan for the 8-day module includes assignments; equipment, tools,…

  15. 29 CFR 1952.151 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... steps provided by the Plan: (a) It is estimated that the draft bill will be enacted by April 1, 1973. (b) The Federal standards will be adopted on the date the bill is ratified. (c) A refresher course for inspectors will begin sixty (60) days after the enactment of the draft bill. (d) Merit system examinations of...

  16. 29 CFR 1952.151 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... steps provided by the Plan: (a) It is estimated that the draft bill will be enacted by April 1, 1973. (b) The Federal standards will be adopted on the date the bill is ratified. (c) A refresher course for inspectors will begin sixty (60) days after the enactment of the draft bill. (d) Merit system examinations of...

  17. 29 CFR 1952.151 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... steps provided by the Plan: (a) It is estimated that the draft bill will be enacted by April 1, 1973. (b) The Federal standards will be adopted on the date the bill is ratified. (c) A refresher course for inspectors will begin sixty (60) days after the enactment of the draft bill. (d) Merit system examinations of...

  18. 29 CFR 1952.151 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... steps provided by the Plan: (a) It is estimated that the draft bill will be enacted by April 1, 1973. (b) The Federal standards will be adopted on the date the bill is ratified. (c) A refresher course for inspectors will begin sixty (60) days after the enactment of the draft bill. (d) Merit system examinations of...

  19. 29 CFR 1952.151 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... steps provided by the Plan: (a) It is estimated that the draft bill will be enacted by April 1, 1973. (b) The Federal standards will be adopted on the date the bill is ratified. (c) A refresher course for inspectors will begin sixty (60) days after the enactment of the draft bill. (d) Merit system examinations of...

  20. 76 FR 18552 - Seeking Public Comment on Two Draft Chapters of the National Health Security Strategy Biennial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... Plan (BIP). This document is intended to describe the priority activities to occur during fiscal years.... The target audience for the BIP is the Nation (individuals, families, communities including all... the draft BIP document which address (1) Strategic Objective 4, Foster Integrated, Scalable Health...

  1. 78 FR 55257 - Request for Comments on the Draft Departmental Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... strategic planning consultation process is an opportunity for the Department to refine and strengthen the... and Human Services, Office of the Assistant Secretary for Planning and Evaluation, Strategic Planning... planning process under the Government Performance and Results Modernization Act of 2010 (GPRA-MA) (Pub. L...

  2. 75 FR 44265 - Office of the Assistant Secretary for Planning and Evaluation; Request for Comments on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... planning process is an opportunity for the Department to further refine and strengthen the strategic goal... for Planning and Evaluation; Request for Comments on the Departmental FY 2010-2015 Strategic Plan... and Human Services Draft FY 2010-2015 Strategic Plan is provided as part of the strategic planning...

  3. Lessons from a local government unit - health academic partnership.

    PubMed

    Paterno, Elizabeth R

    2007-08-01

    The devolution of health services from the Department of Health to the Local Government Unit in the Philippines in 1992 led to the deterioration of the management of local health services. The UP College of Medicine (UPCM) has forged a partnership with a Local Government Unit of a rural municipality to implement a community based health program geared towards the development of local health systems. Program objectives were: (1) to provide learning opportunities for UPCM faculty, medical residents and students in community medicine; and (2) to assist communities develop their health systems. In July, 2004, the UPCM jointly drafted a municipal health plan with its partner municipality. Before the actual planning session, the rural health midwives were assisted by the UPCM students in determining the health needs of their communities and in drafting community health plans. The plans were then presented by the midwives in a 2-day planning workshop, and became the basis of the municipal health plan. The outcome of the workshop was the first municipal health plan that this health office had drafted. Main outcomes from the implementation of the plan included the organization of the Local Health Board, improved health service provision by the municipal health office, active health committees in selected villages and better learning opportunities for medical residents and interns. Colleges of Medicine in the Philippines can and should play a role in the development of local health systems within the overall framework of Alma Ata Primary Health Care. National health planners should seriously consider this role of the health academe.

  4. 78 FR 48504 - Proposed Revisions to Maintenance Rule Standard Review Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... Review Plan AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan-draft section revision... Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 17... and Management System (ADAMS): You may access publicly available documents online in the NRC Library...

  5. 76 FR 66286 - Notice of Final 2010 Effluent Guidelines Program Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... Coalbed Methane Extraction (CBM) industry and will develop pretreatments requirements for discharges of...) industry. EPA is also issuing the detailed study report for the Coalbed Methane Extraction and the... Methane Point Source Category: Detailed Study Report, EPA-820-R-10-022, DCN 09999; Draft Guidance Document...

  6. 40 CFR 307.22 - Preauthorization of response actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... remedial investigation and feasibility study shall, in addition to the requirements in paragraph (b) of this section, include: (1) The scope of the proposed study; (2) A proposed site sampling plan and... recent draft of any pending agreement, reached between such parties and the Federal Government; and (2...

  7. Pre-Publication to the Planning for Natural Disaster Debris Guidance

    EPA Pesticide Factsheets

    EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.

  8. NOAA Gulf Spill Restoration |

    Science.gov Websites

    Plan, Focusing on Recreational Use and Nutrient Reduction Louisiana Trustees Release Fourth Draft Restoration Plan, Focusing on Recreational Use and Nutrient Reduction Read More... Florida Trustee Implementation Group Releases Phase V.2 Final Restoration Plan Florida Trustee Implementation Group Releases

  9. 32 CFR 651.49 - Preliminary phase.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... data, including required studies. (3) Preparation of draft and final EISs (DEISs and FEISs), and... relationship between the timing of the preparation of environmental analyses and the tentative planning and..., preparation of a general expected schedule for future specific implementing (tiered) actions that will involve...

  10. 32 CFR 651.49 - Preliminary phase.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... data, including required studies. (3) Preparation of draft and final EISs (DEISs and FEISs), and... relationship between the timing of the preparation of environmental analyses and the tentative planning and..., preparation of a general expected schedule for future specific implementing (tiered) actions that will involve...

  11. Report of Programme Commission II (Natural Sciences).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France). General Conference.

    As the first part of the report of the Programme Commission II, a summary of discussions on plans for natural sciences and their applications is presented in this document. The two agenda items are: (1) detailed consideration of the 1973-74 draft program and budget and of the 1973-78 draft medium-term outline, and (2) desirability of adopting an…

  12. 77 FR 38823 - Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ..., LVRWB11B4520] Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement... California Desert Conservation Area (CDCA) Plan Amendment (PA) for the Alta East Wind Project (AEWP), and by.../en/fo/ridgecrest/alta_east_wind_project.html . Email: [email protected] . Fax: 951 697-5299. Mail...

  13. The Beida Reform Follows the Example of "Peach Pickers" but Should Spend More Time "Planting Peach Trees"

    ERIC Educational Resources Information Center

    Yang, Gan

    2005-01-01

    After Beijing University produced the first and second drafts (subsequent discussions are based on the second draft) of the "Beijing University Teachers' Engagements and Promotions System Reform Plan," which aroused sharp debates, Zhongshan University stated that the standing committee of its university party committee had examined and…

  14. 76 FR 38676 - Gulf of Mexico (GOM), Outer Continental Shelf (OCS), Central Planning Area (CPA), Oil and Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... September 2008. SUPPLEMENTARY INFORMATION: BOEMRE developed the Draft SEIS for CPA Lease Sale 216/222 to consider new information made available since completion of the Multisale EIS and 2009-2012 SEIS, including information concerning the Deepwater Horizon event and spill and new regulatory requirements. This Draft SEIS...

  15. 76 FR 22139 - Gulf of Mexico (GOM), Outer Continental Shelf (OCS), Western Planning Area (WPA), Oil and Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... additional comments and information regarding the Draft SEIS scheduled for May 17, 2011, and May 19, 2011. For additional information see SUPPLEMENTARY INFORMATION. FOR FURTHER INFORMATION CONTACT: For more information on the Draft SEIS or the public meetings, you may contact Mr. Gary D. Goeke, Bureau of Ocean...

  16. 75 FR 54381 - Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, MT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-R-2010-N078; 60138-1261-6CCP-S3] Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, MT AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability: Draft comprehensive conservation plan and draft...

  17. 77 FR 12579 - Notification of a Public Meeting of the Chartered Science Advisory Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... the Chartered SAB to conduct quality reviews of a draft report on the President's requested FY 2013 budget for EPA research and a draft report on science integration at EPA; to plan for a joint meeting of... receive a briefing on ORD and sustainability science; and to discuss the scientific and technical bases...

  18. 78 FR 40162 - Endangered and Threatened Wildlife and Plants; Notice of Availability of a Technical/Agency Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ...-FF04E00000] Endangered and Threatened Wildlife and Plants; Notice of Availability of a Technical/Agency Draft... recovery potential. Restoring an endangered or threatened animal or plant to the point where it is again a... about the species' biology, and magnitude of threats. Therefore, this recovery plan only establishes...

  19. 75 FR 32963 - Notice of Availability of the Draft Resource Management Plan and Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    .... Alternative B: Same as Alternative A. Alternative C: ACEC would be rescinded. Closed to wind and solar energy... mineral material sales. Closed to wind and solar energy. Closed to motorized travel. Visual Resource... and Hilltop. Closed to wind and solar energy. Visual Resource Management Class I would apply to a...

  20. 78 FR 69705 - Notice of Availability of the Draft Resource Management Plan Amendment and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Resource Area, CO AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In... any of the following methods: Email: BLM_CO[email protected] . Fax: 719-655-2502. Mail: BLM--Blanca Wetlands RMPA/EA, 46525 State Highway 114, Saguache, CO 81149. Copies of the draft RMPA and...

  1. An Assessment of Decision-Making Processes: The Feasibility of Incorporating Climate Change Information into Land Protection Planning (External Review Draft)

    EPA Science Inventory

    This report was prepared by the Global Change Research Program (GCRP) in the National Center for Environmental Assessment (NCEA) of the Office of Research and Development (ORD) at the U.S. Environmental Protection Agency (EPA). This draft report is a review of decision-making pro...

  2. 76 FR 62087 - Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... known as the sand dune lizard, and the lesser prairie-chicken, among the Service, the Bureau of Land... southeastern New Mexico and west Texas. The species only occurs in sand dune complexes associated with shinnery... direct, indirect, and cumulative impacts of the TCP on the quality of the human environment and other...

  3. Response to Comments for DCM Work Plan Risk Assessment

    EPA Pesticide Factsheets

    This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for dichloromethane (DCM).

  4. 77 FR 51044 - Cabo Rojo National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... the human environment, which we included in the draft comprehensive conservation plan and... observation, wildlife photography, environmental education, and interpretation; bicycling, hiking, walking...

  5. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... plan developed with opportunity for public review and comment. To meet this requirement, trustees must, at a minimum, develop a Draft and Final Restoration Plan, with an opportunity for public review of...

  6. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... plan developed with opportunity for public review and comment. To meet this requirement, trustees must, at a minimum, develop a Draft and Final Restoration Plan, with an opportunity for public review of...

  7. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  8. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  9. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  10. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  11. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  12. 77 FR 476 - Endangered and Threatened Species; Recovery Plan Southern Oregon/Northern California Coast Coho...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... and Threatened Species; Recovery Plan Southern Oregon/ Northern California Coast Coho Salmon... Oregon/Northern California Coast (SONCC) Coho Salmon (Oncorhynchus kisutch) Evolutionarily Significant... 95521, Attn: Recovery Coordinator/SONCC Coho Salmon Public Draft Recovery Plan Comments. Hand delivered...

  13. 78 FR 14587 - Kelley-McDonough Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ...] Kelley-McDonough Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Community of Los... that includes the Kelley-McDonough Low-Effect Habitat Conservation Plan for the Morro Shoulderband... plan, draft environmental action statement and low-effect screening form, and related documents on the...

  14. IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral (Scoping and Problem Formulation Materials)

    EPA Science Inventory

    In April 2018, EPA released the draft IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral. An IRIS Assessment Plan (IAP) communicates to the public the plan for assessing each individual chemical and includes summary information on the IRIS Program’s sco...

  15. Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Early Restoration Plan. On April 20, 2011 we reached an agreement with BP to start restoration planning draft plan for the third phase of early restoration in December 2013. We are considering your comments : All Phase III information and documents Phase II Useful Links: Phase II Early Restoration Plan &

  16. CALS Baseline Architecture Analysis of Weapons System. Technical Information: Army, Draft. Volume 8

    DOT National Transportation Integrated Search

    1989-09-01

    This effort was performed to provide a common framework for analysis and planning of CALS initiatives across the military services, leading eventually to the development of a common DoD-wide architecture for CALS. This study addresses Army technical ...

  17. 76 FR 7199 - Science Advisory Board Staff Office; Notification of a Public Meeting of the Science Advisory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ...The Environmental Protection Agency (EPA or Agency) Science Advisory Board (SAB) Staff Office announces a public face-to-face meeting of the SAB Panel to conduct an independent review of EPA's Draft Hydraulic Fracturing Study Plan.

  18. 76 FR 50213 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Bakersfield Section High-Speed Train, Proposes to Construct, Operate, and Maintain an Electric-Powered High...): Merced to Fresno Section High-Speed Train, Proposes to Construct, Operate, and Maintain an Electric.... 20110190, Draft EIS, FRA, MS, Tupelo Railroad Relocation Planning and Environmental Study, To Improve...

  19. 76 FR 64327 - Office of Oceanic and Atmospheric Research Draft Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... science integrity. Ultimately, this plan provides the framework that OAR will use to deliver significant benefits to society while working to advance NOAA's mission of science, service, and stewardship. Dated...

  20. Foreign Languages Course of Study, Junior & Senior High Schools. Draft.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL. Div. of Elementary and Secondary Instruction.

    The study guide outlining the modern foreign language courses for English speakers in Dade County's secondary schools establishes a uniform sequential program for instruction in French, German, Hebrew, Italian, and Spanish. Program expectancies are described for each level and type of course, to serve as a basis for planning appropriate…

  1. 18. FLOOR PLAN AND SECTION DRAWING OF POWERHOUSE FOUNDATION AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. FLOOR PLAN AND SECTION DRAWING OF POWERHOUSE FOUNDATION AND DRAFT TUBE Power House Plan and Sections, drawing E-965. Prepared by the Washington Water Power Company, December 27, 1922, revised January 5, 1926. - Enloe Dam, Power House, On Similkameen River, Oroville, Okanogan County, WA

  2. Corridor-based planning tool for transportation of wind turbine components : manual guide : preliminary draft.

    DOT National Transportation Integrated Search

    2016-08-01

    The enclosed report describes 0-6850-P1, a stand-alone planning tool that can be : used to propose a route plan for wind turbine components passing along Texas routes. : The report provides instructions on how to use the tool.

  3. An Rx for 20/20 Vision: Vision Planning and Education.

    ERIC Educational Resources Information Center

    Chrisman, Gerald J.; Holliday, Clifford R.

    1996-01-01

    Discusses the Dallas Independent School District's decision to adopt an integrated technology infrastructure and the importance of vision planning for long term goals. Outlines the vision planning process: first draft; environmental projection; restatement of vision in terms of market projections, anticipated customer needs, suspected competitor…

  4. 76 FR 5203 - Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Statement, Stehekin River Corridor Implementation Plan, North Cascades National Park Service Complex; Chelan... public comment period. SUMMARY: The National Park Service, in cooperation with the Federal Highway Administration, has prepared a combined Stehekin River Corridor Implementation Plan, Lake Chelan National...

  5. Nantucket, Ma. Climate Protection Action Plan: A Public Outreach Strategy

    NASA Astrophysics Data System (ADS)

    Petrik, C.; Stephenson, A.; Petsch, S.

    2009-12-01

    As communities and municipalities gain a better understanding of climate change, they are exploring the ways in which to work towards adaptation and mitigation. One strategy that the Island of Nantucket, Massachusetts turned toward is the drafting of a Climate Protection Action Plan (CPAP). The CPAP was developed during the summer of 2009 to meet three goals: (1) assist the Town of Nantucket in creating a framework to help them reduce CO2 emissions; (2) educate the municipality and community in techniques that promote energy efficiency and sustainability on the island; and (3) document past, present and future approaches adopted by the Town towards emissions reduction and energy sustainability. In particular, this project focused on using local strengths and natural resources identified by island stakeholders that may help the island to mitigate carbon emissions and adapt to climate change.. Drafting the CPAP provided community members and politicians with an opportunity to become better educated in the science of climate change and to learn how climate change will affect their community. On the island of Nantucket, leaders in the religious, civic, and political communities were brought into a conversation about how each group could contribute to reducing greenhouse gas emissions. A geosciences graduate student was brought into the CPAP team as a climate fellow to facilitate this conversation. This provided the foundation for stakeholder recommendations incorporated into the CPAP. This capacity-building model served as an effective way to create an informal learning environment about climate change that allowed members of the island community to directly participate in developing their locally appropriate climate protection strategy. The draft CPAP developed through this study and presented to the Town of Nantucket comprises assessments and recommendations in public research and education; building and energy efficiency; transportation; renewable energy; and carbon offsets. Through the drafting of these types of Plans, geoscientists have the unique opportunity to offer a scientific foundation to communities that are looking to better understand climate change, its projected affects, and how they can best develop plans for mitigation and adaptation.

  6. 77 FR 2999 - Notice of Availability of the Draft Environmental Impact Statement and Notice of Segregation for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... Resource Management Plan. The proposed wind turbines would be up to 262-feet-tall from the ground to the... to 415 feet. In addition to the wind turbines, the proposed project would require the construction of... the Draft EIS--an 87 wind turbine layout, a 96 wind turbine alternative, and a no-action alternative...

  7. 77 FR 49824 - Draft Environmental Assessment and Draft Habitat Conservation Plan for TransCanada Keystone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... (DHCP) should be submitted in writing, by one of the following methods: Email: [email protected] comments. Please specify if comments are in reference to the DEA, DHCP, or both. FOR FURTHER INFORMATION... 2. The applicant has developed a DHCP as part of the application for an ITP (TE80492A-0), which...

  8. OSD CALS Architecture Master Plan Study. Data Dictionary. Concept Paper. Draft Version 1.2. Volume 29

    DOT National Transportation Integrated Search

    1989-10-01

    Rapid advances in information technology are changing the way technical data is created, stored, and used. These advances have created opportunities to reduce costs and improve productivity in both the administration of data and in the acquisition an...

  9. 33 CFR 148.215 - What if a port has plans for a deep draft channel and harbor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Certification that the port has an active study by the Secretary of the Army for the construction of a deep... employment; and (D) Increases in tax revenues; (vii) Environmental and social impacts of the project on the...

  10. Draft of the Martin Peña Initative Plan

    EPA Pesticide Factsheets

    This action plan is being developed so that EPA Region 2 can implement a strategy that focuses its programs and regulatory authorities in activities that comprehensively address the environmental issues affecting the Martin Pena communities.

  11. 77 FR 11116 - Draft National Plan To Address Alzheimer's Disease

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Alzheimer's Disease, which is available at http://aspe.hhs.gov/daltcp/napa/NatlPlan.shtml . DATES: Submit... Web site as soon as possible after they have been received: http://aspe.hhs.gov/daltcp/napa/#comments...

  12. 77 FR 7134 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... copy (i.e., CD ROM) from Cynthia Anderson by calling (707) 825-5162 or by emailing a request to [email protected] with the subject line ``CD ROM Request for SONCC Coho Salmon Draft Recovery Plan...

  13. Responses to Comments for N-Methylpyrrolidone (NMP) Work Plan Risk Assessment

    EPA Pesticide Factsheets

    This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for n-Methylpyrrolidone (NMP).

  14. Berkeley bicycle plan : draft for inclusion in the general plan

    DOT National Transportation Integrated Search

    1998-12-31

    The City of Berkeley has long supported bicycling as an environmentally friendly, healthy, lowcost method of transportation and recreation. Frequently, roadway facility and funding decisions are made with little consideration for bicycling as a serio...

  15. 75 FR 11194 - San Diego County Water Authority Natural Communities Conservation Program/Habitat Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Diego County Water Authority Natural Communities Conservation Program/Habitat Conservation Plan, San... meetings for the San Diego County Water Authority's (Water Authority/Applicant) draft Natural Communities Conservation Plan (NCCP)/Habitat Conservation Plan (HCP) prepared in application to us for an incidental take...

  16. 77 FR 31036 - Notice of Availability of the Record of Decision for the Taos Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Mexico. FOR FURTHER INFORMATION CONTACT: Brad Higdon, Planning and Environmental Coordinator, Taos Field..., largely through the public participation provided under NEPA. The Draft RMP/ Environmental Impact...] Notice of Availability of the Record of Decision for the Taos Resource Management Plan/Environmental...

  17. 77 FR 17459 - Pacific Fishery Management Council (Pacific Council); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... meeting. SUMMARY: The Pacific Council will convene a meeting of the Ecosystem Plan Development Team (EPDT... drafting a report and recommendations to the Council on the Development of a Fishery Ecosystem Plan (FEP... Council meeting, revise and expand sections of the Council's developing Fishery Ecosystem Plan, discuss...

  18. 77 FR 77117 - Proposed Revision 0 on Access Authorization-Operational Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ...--Operational Program AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan-draft section revision... public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for... seeks comments on the new Section 13.6.4 of the Standard Review Plan (SRP) concerning implementation of...

  19. 77 FR 43808 - Supplement to the Draft Programmatic Restoration Plan and Programmatic Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ...: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce... Liability Act of 1980 (CERCLA), the Oil Pollution Act (OPA) of 1990, the Clean Water Act (CWA), the National Oil and Hazardous Substances Pollution Contingency Plan (National Contingency Plan [NCP]), and other...

  20. 77 FR 75442 - Land Buy-Back Program for Tribal Nations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-20

    ... Department expects to continually update its plans to reflect tribal feedback, lessons learned, and best... of 2011, the Department issued a draft plan dated January 2012. The Department has developed this Initial Implementation Plan for the Land Buy-Back Program for Tribal Nations incorporating input received...

  1. 75 FR 54177 - Notice of Availability of the Draft Jarbidge Field Office Resource Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... throughout the planning area. Alternative III focuses on restoring the resiliency of ecosystem structure and... planning area. Alternative IV focuses on actively restoring the resiliency of ecosystem structure and... Development. Sand Point ACEC (950 acres) Relevant and Important Values: Cultural, Geologic, Historic...

  2. 78 FR 37568 - Draft Environmental Impact Statement for Proposed Strategies To Benefit Native Species by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... Journal, the Missoulian, and on the following Web site: www.mackdays.com . Written comments on the DEIS... Lake and River Fisheries Co-Management Plan, Bull Trout Restoration Plan, Cutthroat Memorandum of... Management Plan. Stakeholders from the Flathead Basin comprise an interdisciplinary team that includes...

  3. 75 FR 40759 - Initiation of Review of Management Plan/Regulations of the Hawaiian Islands Humpback Whale...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ..., living resources and maritime archaeological resources and the human activities that affect them. The... of Review of Management Plan/Regulations of the Hawaiian Islands Humpback Whale National Marine Sanctuary; Intent To Prepare Draft Environmental Impact Statement and Management Plan; Scoping Meetings...

  4. 77 FR 38779 - Notice of Availability of Draft Environmental Impact Statement for the Proposed Mather Specific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Environmental Impact Statement for the Proposed Mather Specific Plan Project, Sacramento County, CA, Corps...-acre Mather Specific Plan area, Sacramento County, California (note that approximately 2,554 acres of the Plan area contains existing development, primarily Mather Airport, a Commerce Center, a...

  5. Draft Plan for Characterizing Commercial Data Products in Support of Earth Science Research

    NASA Technical Reports Server (NTRS)

    Ryan, Robert E.; Terrie, Greg; Berglund, Judith

    2006-01-01

    This presentation introduces a draft plan for characterizing commercial data products for Earth science research. The general approach to the commercial product verification and validation includes focused selection of a readily available commercial remote sensing products that support Earth science research. Ongoing product verification and characterization will question whether the product meets specifications and will examine its fundamental properties, potential and limitations. Validation will encourage product evaluation for specific science research and applications. Specific commercial products included in the characterization plan include high-spatial-resolution multispectral (HSMS) imagery and LIDAR data products. Future efforts in this process will include briefing NASA headquarters and modifying plans based on feedback, increased engagement with the science community and refinement of details, coordination with commercial vendors and The Joint Agency Commercial Imagery Evaluation (JACIE) for HSMS satellite acquisitions, acquiring waveform LIDAR data and performing verification and validation.

  6. 75 FR 12496 - Endangered and Threatened Species; Recovery Plans; Recovery Plan for the Kemp's Ridley Sea Turtle

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... the species. Recovery of Kemp's ridleys has and will continue to be a long- term effort between the U... and Threatened Species; Recovery Plans; Recovery Plan for the Kemp's Ridley Sea Turtle AGENCIES.... SUMMARY: We, NMFS and USFWS, announce the availability for public review of the draft Bi-National Recovery...

  7. 40 CFR 60.1060 - What steps must I complete for my materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What steps must I complete for my... Requirements: Materials Separation Plan § 60.1060 What steps must I complete for my materials separation plan? (a) For your materials separation plan, you must complete nine steps: (1) Prepare a draft materials...

  8. A Guide for Developing a Business Plan for Charter Schools.

    ERIC Educational Resources Information Center

    Charter Friends National Network, St. Paul, MN.

    This guide may be used by charter school operators in developing a business plan that can be used as a management tool in individual schools and in preparing applications for charters, renewals, and grants and loans. A sound business plan must reflect the school's ideas, assets, and needs clearly and succinctly. Drafting a business plan begins…

  9. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    NASA Technical Reports Server (NTRS)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  10. 78 FR 29153 - Notice of Availability of the Draft Resource Management Plan and Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ..., Alternative C: manage livestock grazing and trailing to protect unique and sensitive rare plants and vegetative communities; minimize impacts to rare plants and vegetative communities from recreation use... current levels, unless studies determine that threatened and endangered plant species and unique plant...

  11. Self-Regulated Strategy Instruction in College Developmental Writing

    ERIC Educational Resources Information Center

    MacArthur, Charles A.; Philippakos, Zoi A.; Ianetta, Melissa

    2015-01-01

    The purpose of this study was to evaluate the effects of a curriculum for college developmental writing classes, developed in prior design research and based on self-regulated strategy instruction. Students learned strategies for planning, drafting, and revising compositions with an emphasis on using knowledge of genre organization to guide…

  12. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... given to preparing one statement for all the Federal actions involved. Agencies in such cases should... concurrently with the initial technical and economic studies. (3) Section 102(2)(A) of NEPA requires each Federal agency to utilize a “systematic, interdisciplinary approach” to plans and programs affecting the...

  13. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... given to preparing one statement for all the Federal actions involved. Agencies in such cases should... concurrently with the initial technical and economic studies. (3) Section 102(2)(A) of NEPA requires each Federal agency to utilize a “systematic, interdisciplinary approach” to plans and programs affecting the...

  14. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... given to preparing one statement for all the Federal actions involved. Agencies in such cases should... concurrently with the initial technical and economic studies. (3) Section 102(2)(A) of NEPA requires each Federal agency to utilize a “systematic, interdisciplinary approach” to plans and programs affecting the...

  15. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... given to preparing one statement for all the Federal actions involved. Agencies in such cases should... concurrently with the initial technical and economic studies. (3) Section 102(2)(A) of NEPA requires each Federal agency to utilize a “systematic, interdisciplinary approach” to plans and programs affecting the...

  16. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... given to preparing one statement for all the Federal actions involved. Agencies in such cases should... concurrently with the initial technical and economic studies. (3) Section 102(2)(A) of NEPA requires each Federal agency to utilize a “systematic, interdisciplinary approach” to plans and programs affecting the...

  17. A Method to Assess Climate-Relevant Decisions: Application in the Chesapeake Bay (2010 External Review Draft)

    EPA Science Inventory

    The goal of this study is to formalize an approach to inventory and analyze management decisions in order to produce useful information targeted toward effective adaptation to climate change. The approach uses as its starting point ongoing planning processes and decisions geared ...

  18. 78 FR 5492 - Draft Environmental Impact Statement for Merced Wild and Scenic River Comprehensive Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ...), and the Council on Environmental Quality Regulations (40 CFR part 1500-1508), the National Park... are protected and enhanced over the life of the plan. The Merced River Plan/DEIS evaluates the...

  19. The 1944 Nisei Draft at Heart Mountain, Wyoming: Its Relationship to the Historical Representation of the World War II Japanese American Evacuation.

    ERIC Educational Resources Information Center

    Hansen, Arthur A.

    1996-01-01

    Presents a lesson plan that not only illuminates a little-known incident in Asian American history but also questions how history is constructed and communicated. Provides an excellent historical account of the draft resistance movement within the Nisei internment camps during World War II. Includes handouts and discussion questions. (MJP)

  20. Proposed Master Plan for Higher Education in New Jersey.

    ERIC Educational Resources Information Center

    New Jersey State Commission on Higher Education.

    The draft Master Plan was developed in response to requirements of the New Jersey Higher Education Restructuring Act of 1994. The plan proposes a vision and broad policy recommendations for New Jersey higher education into the next century. The focus of the plan is on the critical needs of the state and how higher education can help in addressing…

  1. 76 FR 23755 - Release of Draft Risk and Exposure Assessments and Final Integrated Review Plan for the National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... titled, ``Ozone National Ambient Air Quality Standards: Scope and Methods Plan for Health Risk and... Standards: Scope and Methods Plan for Welfare Risk and Exposure Assessment'' (REA Plan for the secondary... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 50 and 58 [EPA-HQ-OAR-2008-0699; FRL-9300-4] RIN 2060...

  2. Alaska Statewide Plan for Postsecondary Education, 1986-1990: A Draft for Public Comment. Volume I.

    ERIC Educational Resources Information Center

    Alaska State Commission on Postsecondary Education, Juneau.

    This report, the first statewide master plan for postsecondary education in Alaska, outlines strategies and recommendations to achieve the following planning goals: (1) promote excellence to improve educational service; (2) enhance accountability of the educational process; (3) foster efficiency within the enterprise; and (4) improve access to…

  3. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft report.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding : of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or : "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement ...

  4. 76 FR 54740 - Pacific Fishery Management Council (Council); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... the Ecosystem Plan Development Team (EPDT) which is open to the public. DATES: The EPDT will meet on... Ecosystem Plan (FEP). The EPDT will primarily address Council requests from the June 2011 Council meeting where the Council approved a draft purpose and need statement and moved to develop an ecosystem plan...

  5. IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral (Scoping and Problem Formulation Materials)

    EPA Science Inventory

    In April 2018, EPA released the draft IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral. The IAP communicates to the public the plan for assessing each individual chemical and includes summary information on the IRIS Program’s scoping and initial proble...

  6. Boston Dropouts: Planning a Community Response.

    ERIC Educational Resources Information Center

    Federal Reserve Bank of Boston, MA.

    This pamphlet summarizes a conference in Boston on May 6, 1986. Its goal was to assess and plan strategies for the dropout problem in the Boston Public Schools. The Boston Compact, the draft plan contained in this document and prepared before the conference, served as the focus for discussion. Educators and administrators from across the country…

  7. 77 FR 46790 - Environmental Impact Statement: Dane County, WI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-06

    ... input on the project's Coordination Plan (CP) and Impact Assessment Methodology (IAM) were afforded to.... Public input was obtained on the draft project CP and IAM plan at the October 2007 Public Information Meeting (PIM). The completed project CP and IAM plan was issued in October 2008. A follow-up Agency...

  8. 76 FR 51395 - Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... Statement for the General Management Plan (DEIS/GMP), Canaveral National Seashore, FL AGENCY: National Park... General Management Plan (DEIS/GMP), Canaveral National Seashore (Seashore). SUMMARY: Pursuant to 42 U.S.C... DEIS/GMP for Canaveral National Seashore, Florida. The document provides a framework for management...

  9. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft executive summary.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement Prog...

  10. Phase V of Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Phase V Early Restoration Plan and Environmental Assessment. The project will acquire land along Florida million. Phase V Early Restoration Plan and Environmental Assessment (pdf, 10 MB) Draft Phase V Early Restoration Plan and Environmental Assessment (Executive Summary) (2 MB) Phase V Fact Sheet (pdf, 2 MB) Gulf

  11. U.S. Draft Domestic Action Plan for Lake Erie

    EPA Pesticide Factsheets

    In 2016, in response to the 2012 Great Lakes Water Quality Agreement commitments, Canada and the U.S. adopted phosphorus reduction targets for Lake Erie. Each country is developing domestic action plans which outline strategies for meeting the new targets.

  12. Materials for the WIIN Strategic Plan

    EPA Pesticide Factsheets

    EPA will also be hosting a webinar on March 23, 2017 to review a draft strategic plan that identifies roles and responsibilities for EPA, states and PWS under the requirements of WIIN. EPA will also be hosting a follow up webinar in May.

  13. 75 FR 15436 - Agency Information Collection Activities: Proposed Collection: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ...,034 1 1,034 1.0 1,034 Health Care Plan (Competing).... 800 1 1,034 4.0 4,136 Health Care Plan (Non-Competing) 1,034 1 1,034 2.0 2,068 Business Plan (Competing)....... 800 1 1,034 4.0 4,136 Business Plan (Non... more information on the proposed project or to obtain a copy of the data collection plans and draft...

  14. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... involvement of the responsible parties in the assessment; and (vii) A description of monitoring for.... (3) The monitoring component to the Draft Restoration Plan should address such factors as duration...

  15. Scientific experiments in the flight of the 1977 biological satellite (draft plan)

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The physiological, biological, radiobiological and radiophysical experiments planned for the 1977 biological satellite are described. The biological experiments will involve rats, higher and lower plants, insects and other biological specimens carried on the biosatellite. The responses of these organisms to weightlessness, artificial gravity, cosmic radiation particles and general flight factors will be studied. The radiophysical experiments will investigate certain properties of cosmic radiation as well as the possibility of creating electrostatic and dielectric radiation shields under actual space-flight conditions.

  16. 77 FR 58998 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... reference existing standard operating procedures (SOPs) or other documents. The draft guidance specifies that a monitoring plan may reference existing policies and procedures in order to minimize the burden... risk device studies are already required under Sec. 812.25(e) to submit and maintain written procedures...

  17. Quarterly report for the NGA FFCA project, July 1--September 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributedmore » for review and comment.« less

  18. Fourth Five-Year Plan, 1969-1974. Draft.

    ERIC Educational Resources Information Center

    Planning Commission, New Delhi (India).

    This document is an English language abstract (approximately 1,500 words) of the Fourth Indian Five Year Plan Report, Chapter 15, which deals with Education and Manpower. India's tasks in providing educational facilities for children in the 6-14 age group are immense. Only about 60% of that age group are in school today. The Plan refers to this…

  19. 76 FR 55939 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Statement for the Lander Resource Management Plan Revision Project, Lander Field Office, Wyoming AGENCY... to the Lander Resource Management Plan Revision Project by any of the following methods: Web site... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR0500.L16100000.DP0000. LXSS047K0000...

  20. Key Planning Factors for Recovery from a Radiological Terrorism Incident

    DTIC Science & Technology

    2012-09-01

    United States, Health Phys. 82(5), 591–608. Bromet E.J. (2012). Mental health consequences of the Chernobyl disaster, J Radiol Prot. 2012 Mar; 32(1...Recovery Planning Tools: Recommendations for Developing Regional Disaster Recovery Plans. Draft. Steinhausler, F. (2005), Chernobyl and Goiania Lessons for Responding to Radiological Terrorism. Health Phys. 89(5):566 –574

  1. 77 FR 21993 - Endangered and Threatened Wildlife and Plants; Notice of Availability of a Technical/Agency Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... encompassed all major rivers in the Mobile Basin, including the Alabama, Tombigbee, and Cahaba River systems... plans. Recovery Plan Components The objective of this plan is to provide a framework for the recovery of... Before including your address, phone number, email address, or other personal identifying information in...

  2. 76 FR 23809 - Science Advisory Board Staff Office Notification of a Public Meeting of the Clean Air Scientific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ...: Scope and Methods Plan for Welfare Risk and Exposure Assessment (April 2011 Draft). DATES: The CASAC... Ambient Air Quality Standards: Scope and Methods Plan for Health Risk and Exposure Assessment (April 2011), and Ozone National Ambient Air Quality Standards: Scope and Methods Plan for Welfare Risk and Exposure...

  3. Drafting a Customized Tech Plan: Throw out Yesterday's Creaky Model

    ERIC Educational Resources Information Center

    Solomon, Gwen

    2004-01-01

    Today, states and districts are zeroing in on standards-based learning and high stakes test scores--even benchmarking results in advance of the school year. Technology planning is--or should be--a key part of any such learning design. With careful planning for integration districts can be helped to more successfully address standards and, in…

  4. 78 FR 69123 - Draft Long Range Transportation Plan for U.S. Fish and Wildlife Service Lands in the Midwest Region

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... decision-making. Establish a vision, mission, goals, and objectives for transportation planning in the... as a pilot project for the implementation of a region-level transportation planning process within... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-R-2012-N270; FXRS85550300000-XXX...

  5. 75 FR 1802 - Termination of the Environmental Impact Statement for the General Management Plan, Gila Cliff...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ... Management Plan because it has determined that an Environmental Assessment (EA) is the more appropriate... Assessment was approved by the Chief of the NPS Environmental Quality Division on November 4, 2009. The draft general management plan and Environmental Assessment is expected to be distributed for a 30 day public...

  6. 77 FR 51568 - Outer Continental Shelf, Gulf of Mexico, Oil and Gas Lease Sales, Western Planning Area Lease...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Western Planning Area (WPA) Lease Sale 233 and Central Planning Area (CPA) Lease Sale 231 (WPA/CPA... is reopening the scoping comment period. DATES: Scoping comments for this Draft WPA/CPA Supplemental...-opening of the scoping process for the WPA/CPA Supplemental EIS. Throughout the scoping process, Federal...

  7. Vermont State Board of Education Department of Education Strategic Plan

    ERIC Educational Resources Information Center

    Vermont Department of Education, 2005

    2005-01-01

    Section 180 of Title 16 requires the State Board of Education (Board) to "adopt through a public process a statewide strategic education plan to describe how the agency will help school boards to improve student performance." The Vermont State Board of Education and Commissioner Richard H. Cate drafted a plan that was adopted by the…

  8. 15 CFR 990.23 - Compliance with NEPA and the CEQ regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., federal trustees must issue a Finding of No Significant Impact (FONSI) as part of the restoration plans... Plan/EA and FONSI. (F) The means by which a federal trustee requests, considers, and responds to public comments on the Draft Restoration Plan/EA and FONSI must also be consistent with the federal agency's NEPA...

  9. 78 FR 29318 - Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands, Colorado and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    .../ grasslands plan amendments to the 1984 PSICC Land and Resource Management Plan (Forest Plan) may be needed to... areas in Colorado. The scope of the analysis is Forest and Grassland-wide. DATES: Comments concerning the scope of this analysis should be received by June 19, 2013. The draft environmental impact...

  10. 77 FR 51521 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    .../Aleutian Islands (BS/AI) groundfish plan teams will meet in Seattle, WA. DATES: The meetings will begin at... Marine Mammal Lab Room 2039 (GOA Plan Team) and Traynor Room 2076 (BS/AI Plan Team), Seattle, WA. Council... for 2013/14. The teams also will review status reports on various management actions, review the draft...

  11. Computer Supported Argument Visualisation: Modelling in Consultative Democracy Around Wicked Problems

    NASA Astrophysics Data System (ADS)

    Ohl, Ricky

    In this case study, computer supported argument visualisation has been applied to the analysis and representation of the draft South East Queensland Regional Plan Consultation discourse, demonstrating how argument mapping can help deliver the transparency and accountability required in participatory democracy. Consultative democracy for regional planning falls into a category of problems known as “wicked problems”. Inherent in this environment is heterogeneous viewpoints, agendas and voices, built on disparate and often contradictory logic. An argument ontology and notation that was designed specifically to deal with consultative urban planning around wicked problems is the Issue Based Information System (IBIS) and IBIS notation (Rittel & Webber, 1984). The software used for argument visualisation in this case was Compendium, a derivative of IBIS. The high volume of stakeholders and discourse heterogeneity in this environment calls for a unique approach to argument mapping. The map design model developed from this research has been titled a “Consultation Map”. The design incorporates the IBIS ontology within a hybrid of mapping approaches, amalgamating elements from concept, dialogue, argument, debate, thematic and tree-mapping. The consultation maps developed from the draft South East Queensland Regional Plan Consultation provide a transparent visual record to give evidence of the themes of citizen issues within the consultation discourse. The consultation maps also link the elicited discourse themes to related policies from the SEQ Regional Plan providing explicit evidence of SEQ Regional Plan policy-decisions matching citizen concerns. The final consultation map in the series provides explicit links between SEQ Regional Plan policy items and monitoring activities reporting on the ongoing implementation of the SEQ Regional Plan. This map provides updatable evidence of and accountability for SEQ Regional Plan policy implementation and developments.

  12. Navy Health Care Strategic Planning Process: A Draft Functional Description

    DTIC Science & Technology

    1993-09-01

    56 a. Equipment Environment ................................................... 56...b. Support Software Environment .............................................. 56 c. Communications Requirements... Environment .................................................................. 73 a. AIS Equipment Environment

  13. IRIS Assessment Plan for Chloroform (Scoping and Problem Formulation Materials)

    EPA Science Inventory

    In September 2017, EPA released the draft IRIS Assessment Plan (IAP) for Chloroform for public review and comment. ...

  14. IRIS Assessment Plan for Chloroform (Scoping and Problem Formulation Materials)

    EPA Science Inventory

    In September 2017, EPA released the draft IRIS Assessment Plan (IAP) for Chloroform for public review and comment. Th...

  15. 78 FR 41947 - Notice of Availability of a Supplement to the Bighorn Basin Draft Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... Washakie Counties, and most of Hot Springs County in north-central Wyoming. The Planning Area includes all... listed in the ADDRESSES section above. In order to reduce the use of paper and control costs, the BLM...

  16. Food for Thought: Discussion Draft for a Master Plan.

    ERIC Educational Resources Information Center

    Chicago City Coll., IL.

    Articles contributed by the teachers and administrators at Chicago City College are presented in this report. Topics include: Students, Faculty, A View of General Education, Occupational Education, Collective Comprehensiveness, Innovation Plan for Crane Campus, Fiscal Resources, Governance, Administration and Organization, A Note on Community…

  17. 77 FR 37672 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... EIS, NOAA, AS, Fagatele Bay National Marine Sanctuary Management Plan, Implementation, Tutuila Island.... 20120195, Draft EIS, NPS, FL, Fort Matanzas National Monument General Management Plan, Implementation, St... filing documents online and providing feedback on the process. To participate in the pilot, register at...

  18. 15 CFR 921.10 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...

  19. 15 CFR 921.10 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...

  20. IRIS Assessment Plan for Ethylbenzene (Scoping and Problem Formulation Materials)

    EPA Science Inventory

    In September 2017, EPA released the draft IRIS Assessment Plan (IAP) for Ethylbenzene for public review and comment. ...

  1. Technical and Occupational Shops.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…

  2. Mars Sample Handling Protocol Workshop Series: Workshop 4

    NASA Technical Reports Server (NTRS)

    Race Margaret S. (Editor); DeVincenzi, Donald L. (Editor); Rummel, John D. (Editor); Acevedo, Sara E. (Editor)

    2001-01-01

    In preparation for missions to Mars that will involve the return of samples to Earth, it will be necessary to prepare for the receiving, handling, testing, distributing, and archiving of martian materials here on Earth. Previous groups and committees have studied selected aspects of sample return activities, but specific detailed protocols for the handling and testing of returned samples must still be developed. To further refine the requirements for sample hazard testing and to develop the criteria for subsequent release of sample materials from quarantine, the NASA Planetary Protection Officer convened a series of workshops in 2000-2001. The overall objective of the Workshop Series was to produce a Draft Protocol by which returned martian sample materials can be assessed for biological hazards and examined for evidence of life (extant or extinct) while safeguarding the purity of the samples from possible terrestrial contamination. This report also provides a record of the proceedings of Workshop 4, the final Workshop of the Series, which was held in Arlington, Virginia, June 5-7, 2001. During Workshop 4, the sub-groups were provided with a draft of the protocol compiled in May 2001 from the work done at prior Workshops in the Series. Then eight sub-groups were formed to discuss the following assigned topics: Review and Assess the Draft Protocol for Physical/Chemical Testing Review and Assess the Draft Protocol for Life Detection Testing Review and Assess the Draft Protocol for Biohazard Testing Environmental and Health/Monitoring and Safety Issues Requirements of the Draft Protocol for Facilities and Equipment Contingency Planning for Different Outcomes of the Draft Protocol Personnel Management Considerations in Implementation of the Draft Protocol Draft Protocol Implementation Process and Update Concepts This report provides the first complete presentation of the Draft Protocol for Mars Sample Handling to meet planetary protection needs. This Draft Protocol, which was compiled from deliberations and recommendations from earlier Workshops in the Series, represents a consensus that emerged from the discussions of all the sub-groups assembled over the course of the five Workshops of the Series. These discussions converged on a conceptual approach to sample handling, as well as on specific analytical requirements. Discussions also identified important issues requiring attention, as well as research and development needed for protocol implementation.

  3. Everybody wants it done but nobody wants to do it: an exploration of the barrier and enablers of critical components towards creating a clinical pathway for anxiety and depression in cancer.

    PubMed

    Rankin, Nicole M; Butow, Phyllis N; Thein, Thida; Robinson, Tracy; Shaw, Joanne M; Price, Melanie A; Clover, Kerrie; Shaw, Tim; Grimison, Peter

    2015-01-22

    This study aimed to explore barriers to and enablers for future implementation of a draft clinical pathway for anxiety and depression in cancer patients in the Australian context. Health professionals reviewed a draft clinical pathway and participated in qualitative interviews about the delivery of psychosocial care in their setting, individual components of the draft pathway, and barriers and enablers for its future implementation. Five interrelated themes were identified: ownership; resources and responsibility; education and training; patient reluctance; and integration with health services beyond oncology. The five themes were perceived as both barriers and enablers and provide a basis for an implementation plan that includes strategies to overcome barriers. The next steps are to design and deliver the clinical pathway with specific implementation strategies that address team ownership, endorsement by leaders, education and training modules designed for health professionals and patients and identify ways to integrate the pathway into existing cancer services.

  4. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to providemore » the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.« less

  5. 78 FR 57875 - Notice of Availability of the Draft Southeast Missouri Ozarks Regional Restoration Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ....S. Fish and Wildlife Service (FWS); the United States Department of Agriculture (USDA), acting... Agriculture establishes a Trustee Council charged with developing and implementing a restoration plan for... the environment. The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA...

  6. 75 FR 23823 - Sixth Northwest Electric Power and Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... and development; a methodology for determining quantifiable environmental costs and benefits; a 20... December 2007, and in September 2009, the Council released for public review and comment the Draft Northwest Sixth Electric Power and Conservation Plan. During the comment period, the Council held public...

  7. School Crisis Management Manual: Guidelines for Administrators.

    ERIC Educational Resources Information Center

    Smith, Judie

    A disturbing escalation in campus emergencies compels school districts to draft effective crisis-management action plans. Effective plans can be devised that relieve burdens on principals and other school personnel, by diminishing chaos and panic, disseminating accurate information, attending to emotional strain on staff and students, and…

  8. 75 FR 38464 - Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... Pacific Fishery Management Council (Pacific Council) will convene a meeting of the Ecosystem Plan... purpose of reviewing comments of the Ecosystem Advisory Subpanel (EAS) and drafting a report to the Pacific Council on initial stages of developing an Ecosystem Fishery Management Plan (EFMP). The EPDT has...

  9. EXTERNAL PEER REVIEW OF THE DRAFT REGION 4 ...

    EPA Pesticide Factsheets

    EPA scientists in Region 4 (Atlanta) conducted a review of data and information regarding hypoxia in the northern Gulf of Mexico. This Region 4 staff assessment concluded that phosphorus, rather than nitrogen, may be the limiting nutrient controlling Gulf hypoxia. An unauthorized draft of the report was released in January of 2004. This report, because of its controversial conclusion regarding the role of phosphorus in Gulf hypoxia, caused a significant amount of concern among stakeholders. After considerable internal review by Region 4 EPA scientists, the Region released a significantly revised version of the draft report for a broader internal EPA review in April 2004. The report was revised based on the broader EPA review and released to the Hypoxia Task Force in August 2004, as an informational document with the specific purpose of encouraging discussion and posing questions for the reassessment of the Action Plan. The draft report,

  10. Planning, Management and Evaluation: Realizing PIC Potential. Private Industry Council Guide. Working Draft.

    ERIC Educational Resources Information Center

    National Alliance of Business, Inc., Washington, DC.

    This Planning, Management, and Evaluation (PME) guide was developed by the National Alliance of Business as part of its program of management assistance for Private Industry Councils (PICs). The guide is a tool which PICs can use to improve their capability to plan, manage, and evaluate the programs which they administer, and to establish locally…

  11. Sulfur Oxides Risk and Exposure Assessment Planning ...

    EPA Pesticide Factsheets

    In conducting risk/exposure assessments for the Sulfur Oxides NAAQS review, EPA will first develop a draft Scope and Methods Plan which will describe the proposed scope of the quantitative and qualitative analyses to be performed and the tools/methods that may be employed Provide opportunity for CASAC feedback on EPA's plans for the risk and exposure assessment for the Sulfur Oxides NAAQS review

  12. 78 FR 54478 - Endangered and Threatened Wildlife and Plants; Permits; Low-Effect Habitat Conservation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... the Utah Prairie Dog in Iron County, Utah AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... Draft Low-effect Habitat Conservation Plan for the Utah prairie dog in Iron County, Utah, for review and... Conservation Plan for the Utah prairie dog in Iron County, Utah. The Iron County Commission has prepared a...

  13. Autism Spectrum Disorders According to "DSM-IV-TR" and Comparison with "DSM-5" Draft Criteria: An Epidemiological Study

    ERIC Educational Resources Information Center

    Mattila, Marja-Leena; Kielinen, Marko; Linna, Sirkka-Liisa; Jussila, Katja; Ebeling, Hanna; Bloigu, Risto; Joseph, Robert M.; Moilanen, Irma

    2011-01-01

    Objective: The latest definitions of autism spectrum disorders (ASDs) were specified in "DSM-IV-TR" in 2000. "DSM-5" criteria are planned for 2013. Here, we estimated the prevalence of ASDs and autism according to "DSM-IV-TR," clarified confusion concerning diagnostic criteria, and evaluated "DSM-5" draft…

  14. 77 FR 11084 - Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Environmental Impact Statement/ Environmental Impact Report for the Proposed Cambria Water Supply Project, San... Report (EIS/EIR) to study, plan, and implement a project to provide for a reliable water supply for the... the area relying solely upon local groundwater for its current water supply. The groundwater supplies...

  15. 76 FR 66958 - Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... energy development on BLM-administered lands. The elements of the BLM's proposed Solar Energy Program.... Amendment of BLM land use plans in the six-state study area to adopt those elements of the new Solar Energy... development, the BLM also proposes a process that will accommodate responsible development outside of SEZs...

  16. The Role of "Outside" Organizations in Foreign Language Teacher Education.

    ERIC Educational Resources Information Center

    Love, William D., Ed.

    A short review of the various "revolutions" in methodology which foreign language instruction has undergone since its inception as an area of study leads into an appraisal of the role of government and private foundations in the education of teachers. The four-point program of the Washington Fourth Draft plan for teacher education and…

  17. Draft final feasibility study report and proposed plan for Operable Unit 4, response to comments: Fernald Environmental Management Project, Fernald, Ohio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.

  18. 76 FR 18773 - Marianas Trench Marine National Monument, Commonwealth of the Northern Mariana Islands, et al...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Islands, et al.; Monument Management Plan, Comprehensive Conservation Plans, and Environmental Assessment... the National Atmospheric and Oceanic Administration (NOAA), intend to prepare the monument management... the National Wildlife Refuge System (NWRS) contained therein. When the draft MMP is complete, we will...

  19. A long-term plan for evaluating the FHWA's Office of Safety programs : final draft

    DOT National Transportation Integrated Search

    2006-01-01

    The purpose of this report is to develop a generalized plan for evaluating and measuring the effectiveness of the major safety programs of the the FHWA Office of Safety. This report is organized into three sections in order to coincide with the state...

  20. A Menu of Options for Developing Tribal Air Grant Work Plans and Managing Grants for Environmental Results

    EPA Pesticide Factsheets

    Tool to assist tribes that apply for Clean Air Act (CAA) funding to draft more effective work plans for projects that will develop tribal knowledge of air quality issues and build tribal expertise to manage air quality on tribal lands.

  1. 75 FR 62610 - Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ...: Draft Regulatory Guide DG-1237, ``Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors,'' Interim Staff Guidance (ISG) NSIR/DPR-ISG-01, ``Emergency Planning for Nuclear Power Plants... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS...

  2. 78 FR 69412 - Draft FY 2014-2018 EPA Strategic Plan; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... to our existing Plan that seek to advance efforts to address our changing climate, protect our... across the country and tackling the issue of climate change. DATES: Comments must be received on or... business in achieving its results. The five strategic goals are: Addressing Climate Change and Improving...

  3. Vision for Excellence

    ERIC Educational Resources Information Center

    Fain, Paul

    2007-01-01

    Strategic plans migrated to higher education from the corporate world. Although some universities have been drafting them for at least 40 years, their use has exploded over the last decade, particularly in the last two years. Now virtually every institution, from research universities to community colleges, has a plan. Competition for students,…

  4. Safety and fitness electronic records system (SAFER) : draft master test plan

    DOT National Transportation Integrated Search

    1995-12-31

    The purpose of this plan is to establish a formal set of guidelines and activities to be : adhered to and performed by JHU/APL and the developer to ensure that the SAFER System has been tested successfully and is fully compliant with the SAFER System...

  5. 75 FR 22100 - Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... (closed to public). 11-2:30 p.m. Planning and Evaluation Committee. 2:30-3 Budget committee. 3-3:30 Ad Hoc... Embassy Suites DC Convention Center Hotel, located at 900 10th Street, NW., Washington, DC 20001. FOR... the draft March 31, 2010 meeting minutes. Budget Committee Report. Planning and Evaluation Committee...

  6. 77 FR 65363 - New England Fishery Management Council (NEFMC); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... present an overview of the NEFSC draft Strategic Plan. A question and answer period is scheduled to [[Page... to modify accountability measures (AMs) in the Herring Fishery Management Plan (FMP). A public... measures, will be addressed during the remainder of the day. Decisions may include: specifications for the...

  7. LABORATORY INVOLVEMENT IN PLANNING FOR AND RESPONDING TO CONTAMINATION THREATS TO DRINKING WATER SYSTEMS

    EPA Science Inventory


    EPA's National Homeland Security Research Center (Office of Research and Development) and Water Protection Task Force (Office of Water) have jointly developed a draft analytical guide that may be used by laboratories to plan for and provide support to a drinking water utility...

  8. 77 FR 9652 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... Road-Related Impacts to Wildlife, Fish, Soil, and Water Resources and Restoration of 2010 Forest Plan..., Amendment 18A to the Fishery Management Plan for the Snapper-Grouper Fishery of the South Atlantic Region...-9235. EIS No. 20120034, Draft EIS, USFS, CA, Harris Vegetation Management Project, To Improve Forest...

  9. 77 FR 76065 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ..., exotic species, grazing, hydrologic changes, invasive plants, pollution, and energy resource exploration... revised recovery plan for the Kendall Warm Springs dace (Rhinichthys osculus thermalis). This species is federally listed as endangered under the Endangered Species Act of 1973, as amended (ESA). The Service...

  10. Conservation Task Force Report on Education and Training. Draft Copy.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC. Educational Programs Div.

    Several months ago a planning session was held during which representatives of several colleges and universities shared their plans and strategies for energy conservation education. This publication contains reports from five community colleges, two universities, and one technical institute about how they have applied energy conservation and…

  11. 77 FR 2514 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... for users, more efficient and coordinated decision-making, and improved sharing of data and technology... the preparation of the final plan. We welcome your general input, and also pose the following...: Strengthen and integrate Federal and non-Federal ocean observing systems, sensors, data collection platforms...

  12. IRIS Assessment Plan for Nitrate and Nitrite (Scoping and Problem Formulation Materials)

    EPA Science Inventory

    In September 2017, EPA released the draft IRIS Assessment Plan (IAP) for Nitrate and Nitrite for public review and comment. This document was discussed at an EPA Science Advisory Board (SAB) Chemical Assessment Advisory Committee (CAAC) meeting on September 27-28, 2017....

  13. 78 FR 41434 - Proposed Revisions to Design of Structures, Components, Equipment and Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ..., Components, Equipment and Systems AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan-draft... Systems, Piping Components and their Associated Supports,'' of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.'' DATES: Submit comments by...

  14. Policy and planning of prevention in Italy: Results from an appraisal of prevention plans developed by Regions for the period 2010-2012.

    PubMed

    Rosso, Annalisa; Marzuillo, Carolina; Massimi, Azzurra; De Vito, Corrado; de Belvis, Anton Giulio; La Torre, Giuseppe; Federici, Antonio; Ricciardi, Walter; Villari, Paolo

    2015-06-01

    Health policies on disease prevention differ widely between countries. Studies suggest that different countries have much to learn from each other and that significant health gains could be achieved if all countries followed best practice. This paper describes the policy development and planning process relating to prevention activities in Italy, through a critical appraisal of Regional Prevention Plans (RPPs) drafted for the period 2010-2012. The analysis was performed using a specific evaluation tool developed by a Scientific Committee appointed by the Italian Ministry of Health. We appraised nineteen RPPs, comprising a total of 702 projects, most of them in the areas of universal prevention (62.9%) and prevention in high risk groups (27.0%). Italian Regions established prevention activities using an innovative combination of population and high-risk individuals approaches. However, some issues, such as the need to reduce health inequalities, were poorly addressed. The technical drafting of RPPs required some improvement; e.g. the evidence of the effectiveness and cost-effectiveness of the health interventions proposed was seldom reported. There were significant geographical differences across the Regions in the appraisal of RPPs. Our research suggests that continuous assessment of the planning process of prevention may become a very useful tool for monitoring, and ultimately strengthening, public health capacity in the field of prevention. Further research is needed to analyze determinants of regional variation. Copyright © 2015 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.

  15. 2013 Technical Roundtable

    EPA Pesticide Factsheets

    On December 9, 2013, EPA reconvened the study’s Technical Roundtable. Subject-matter experts discussed the outcomes of the 2013 Technical Workshops, stakeholder engagement, and plans for draft assessment report.

  16. Balanced biomedical program plan. Volume X. Fusion analysis for and environmental research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-06-01

    In this draft planning document for health and environmental research needs relevant to the development of fusion technology, an attempt is made to integrate input from the participating laboratories on the basis of the King-Muir study categories. The general description covers only those concepts and features that are considered important to an understanding of possible and probable effects of thermonuclear reactors on health and the environment. Appendixes are included which reflect an understanding of three areas of special interest: materials requirements, effects from magnetic fields, and tritium effects.

  17. 76 FR 82319 - Gulf of Mexico (GOM), Outer Continental Shelf (OCS), Western Planning Area (WPA) and Central...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... Continental Shelf (OCS), Western Planning Area (WPA) and Central Planning Area (CPA), Oil and Gas Lease Sales... prepared a Draft EIS on oil and gas lease sales tentatively scheduled in 2012-2017 in the WPA and CPA... scheduled for the WPA and five annual areawide lease sales are scheduled for the CPA. The proposed WPA lease...

  18. Proceedings of the Joint Logistics Commanders Joint Policy Coordinating Group on Computer Resource Management; Computer Software Management Software Workshop, 2-5 April 1979.

    DTIC Science & Technology

    1979-08-21

    Appendix s - Outline and Draft Material for Proposed Triservice Interim Guideline on Application of Software Acceptance Criteria....... 269 Appendix 9...AND DRAFT MATERIAL FOR PROPOSED TRISERVICE INTERIM GUIDELINE ON APPLICATION OF SOFTWARE ACCEPTANCE CRITERIA I I INTRODUCTION The purpose of this guide...contract item (CPCI) (code) 5. CPCI test plan 6. CPCI test procedures 7. CPCI test report 8. Handbooks and manuals. Al though additional material does

  19. Department of the Treasury, Internal Revenue Service: Statement in Preamble to Regulations That Cash Balance Plans Are Not Age-Discriminatory

    DTIC Science & Technology

    2001-03-21

    has any record of a draft of the regulation or the preamble being sent to the EEOC . EEOC officials had no recollection of receiving a draft of either...document. To the best of their recollection, IRS officials believe that EEOC was not made aware of the regulation or preamble. As indicated, DOL was...it issued the final regulation . Specifically, EEOC argues that ORBA ‘86 required Treasury to coordinate with EEOC before issuing regulations or

  20. Rotor systems research aircraft predesign study. Volume 3: Predesign report

    NASA Technical Reports Server (NTRS)

    Schmidt, S. A.; Linden, A. W.

    1972-01-01

    The features of two aircraft designs were selected to be included in the single RSRA configuration. A study was conducted for further preliminary design and a more detailed analysis of development plans and costs. An analysis was also made of foreseeable technical problems and risks, identification of parallel research which would reduce risks and/or add to the basic capability of the aircraft, and a draft aircraft specification.

  1. 76 FR 45543 - Notice of Intent To Prepare a Draft Environmental Impact Statement for the Skagit River General...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... proposed flood-risk management project in the Skagit River Basin from Ross Dam to the river mouth at Skagit... share of the project costs. This is a single-purpose flood-risk management study. The goal of this project is to identify the National Economic Development (NED) plan, the flood-risk management alternative...

  2. Impact of Job Design Problems and Lack of Support. Draft Version. Working Paper #6.

    ERIC Educational Resources Information Center

    Gersten, Russell; And Others

    This paper presents implications of the path analysis procedures used to interpret data from a study of urban special education teachers' perceptions of working conditions. The analysis looked at a broad range of factors that could affect teacher plans to leave the field. An overall finding emerging from the analysis was that the same fundamental…

  3. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document. Volume 1: Major trades. Book 2: Draft final

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Topics addressed are: (1) an artificial gravity assessment study; (2) Mars mission transport vehicle (MTV)/Mars excursion vehicle (MEV) mission scenarios; (3) aerobrake issues; (4) equipment life and self-check; (5) earth-to-orbit (ETO) heavy lift launch vehicle (HLLV) definition trades; and (6) risk analysis.

  4. 75 FR 54378 - Draft Environmental Impact Statement; Stehekin River Corridor Implementation Plan; Lake Chelan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    .... While the COE failed to secure funds to do a detailed five-year study, its emergency management team recommended extensive bank hardening with rock, and dredging of the river channel. Estimated one-time cost is... floods. Until now, the NPS has addressed problems on a case-by-case basis throughout the valley with the...

  5. 76 FR 59158 - Notice of Availability of Draft General Management Plan/Environmental Impact Statement for Effigy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... Management Plan/ Environmental Impact Statement for Effigy Mounds National Monument, Iowa AGENCY: National... Protection Agency. Public meetings will be held during the 60-day review period on the GMP/EIS in the Harpers... experience, to the socioeconomic environment, and to monument operations and facilities. The preferred...

  6. 75 FR 1418 - Implementation of Open Government Directive

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... three high-value data sets by January 22, 2010, and an Open Government Plan by April 7, 2010. While the... and publish high-value data sets and draft an Open Government Plan, and the NRC is now inviting public...-value data sets as soon as possible to assure consideration for purposes of the Open Government...

  7. 75 FR 32493 - NUREG-0654/FEMA-REP-, Rev. 1, Supplement 3, Guidance for Protective Action Recommendations for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... has been proposed by these two agencies to address emergency planning and preparedness for Nuclear..., to measure the adequacy of emergency preparedness plans of Nuclear Power Plant (NPP) owners and... changes proposed in FEMA's draft Radiological Emergency Preparedness Program Manual and Supplement 4 to...

  8. 78 FR 67212 - Notice of Meeting of the Transit Rail Advisory Committee for Safety (TRACS)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... the safety of public transportation systems. DATES: The TRACS meeting will be held on November 21... Letter Report on the Development of the National Public Transportation Safety Plan (4) Review of the Draft Letter Report on Public Transportation Agency Plans (5) Public Comments (6) Wrap Up As previously...

  9. 78 FR 5490 - Draft Environmental Impact Statement for Tuolumne Wild and Scenic River Comprehensive Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... Environmental Impact Statement for Tuolumne Wild and Scenic River Comprehensive Management Plan, Yosemite... Statement (DEIS) for the proposed Tuolumne Wild and Scenic River Comprehensive Management Plan (TRPCMP). The...), and will provide long-term guidance for management of the 54 miles of the Tuolumne River that flows...

  10. 75 FR 52776 - Notice of Availability of the Draft Environmental Impact Statement for the Desert Sunlight...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ...) solar photovoltaic (PV) facility and associated 220- kilovolt (kV) generation interconnection line (gen... solar PV facility on public lands in compliance with FLPMA, NEPA, BLM ROW and land use planning... Holdings, LLC Desert Sunlight Solar Farm Project and Possible California Desert Conservation Area Plan...

  11. 78 FR 71640 - Notice of Availability of the Draft Joint Environmental Impact Statement and Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ..., maintain, and decommission a solar photovoltaic (PV) power plant facility proposed on 4,179 acres with... and California Desert Conservation Area Plan Amendment for the Proposed Soda Mountain Solar Project... Desert Conservation Area (CDCA) Plan Amendment for the Soda Mountain Solar Project (Project), San...

  12. 75 FR 20592 - Notice of Availability of Draft National Pollutant Discharge Elimination System (NPDES) General...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... control is necessary based on wasteload allocations in the Lower Charles River Phosphorus TMDL (``the TMDL... management plan and a phosphorus reduction plan, as the mechanisms to achieve the required pollutant... Consistent with the wasteload allocation of the Lower Charles River Phosphorus TMDL, Part IV and Appendix D...

  13. 7 CFR 1781.17 - Docket preparation and processing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., schedules, and estimated consumption of water should be made by the same methods as for loans for domestic... preliminary draft of the watershed plan or RCD area plan, together with an estimate of costs and benefits.... It should relate project costs to benefits of the WS or RCD loan or WS advance. Minimum and average...

  14. 7 CFR 1781.17 - Docket preparation and processing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., schedules, and estimated consumption of water should be made by the same methods as for loans for domestic... preliminary draft of the watershed plan or RCD area plan, together with an estimate of costs and benefits.... It should relate project costs to benefits of the WS or RCD loan or WS advance. Minimum and average...

  15. 7 CFR 1781.17 - Docket preparation and processing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., schedules, and estimated consumption of water should be made by the same methods as for loans for domestic... preliminary draft of the watershed plan or RCD area plan, together with an estimate of costs and benefits.... It should relate project costs to benefits of the WS or RCD loan or WS advance. Minimum and average...

  16. 7 CFR 1781.17 - Docket preparation and processing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., schedules, and estimated consumption of water should be made by the same methods as for loans for domestic... preliminary draft of the watershed plan or RCD area plan, together with an estimate of costs and benefits.... It should relate project costs to benefits of the WS or RCD loan or WS advance. Minimum and average...

  17. 7 CFR 1781.17 - Docket preparation and processing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., schedules, and estimated consumption of water should be made by the same methods as for loans for domestic... preliminary draft of the watershed plan or RCD area plan, together with an estimate of costs and benefits.... It should relate project costs to benefits of the WS or RCD loan or WS advance. Minimum and average...

  18. Special Libraries: Planning and Operation; Preliminary Draft.

    ERIC Educational Resources Information Center

    Weiner, Betty H.

    An attempt is made in this report to combine a pragmatic how-to-do-it approach with suggestions for applying system analysis techniques for planning and operating a small special library or information center. A special library is defined as a library in a commercial, industrial, governmental or non-profit organization such as research…

  19. 76 FR 66734 - National Institute on Deafness and Other Communication Disorders Draft 2012-2016 Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ... areas of hearing and balance; smell and taste; and voice, speech, and language. The Strategic Plan... research training in the normal and disordered processes of hearing, balance, smell, taste, voice, speech... into three program areas: Hearing and balance; smell and taste; and voice, speech, and language. The...

  20. 77 FR 14567 - Draft General Management Plan/Environmental Impact Statement for the Ice Age Complex at Cross...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... Impact Statement for the Ice Age Complex at Cross Plains, Cross Plains, Wisconsin AGENCY: National Park... General Management Plan/Environmental Impact Statement for the Ice Age Complex at Cross Plains, Wisconsin... also send comments to Superintendent, Ice Age National Scenic Trail, 700 Rayovac Drive, Suite 100...

  1. 77 FR 62528 - Termination of Environmental Impact Statement for the General Management Plan, Mount Rushmore...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... environmental impact statement (EIS) for the Mount Rushmore National Memorial General Management Plan (GMP) and will be preparing an Environmental Assessment (EA) instead. DATES: The draft GMP EA is expected to be... the appropriate level of environmental documentation for the GMP. Preliminary analysis of alternatives...

  2. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to...

  3. 76 FR 37141 - Notice of Availability for Comment: Draft Recovery Plan, First Revision; Mexican Spotted Owl

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... the following methods: U.S. mail: Field Supervisor, at the above address; Hand-delivery: Arizona... important to Mexican spotted owls are mixed conifer, pine-oak, and riparian habitats. Threats to the owl's... significant revision since the original plan, incorporating the most recent scientific research specific to...

  4. 77 FR 33243 - Public Comment and Public Meeting on Draft Revisions to the Federal Environment Element of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Federal Environment Element of the Comprehensive Plan for the National Capital: Federal Elements AGENCY... Environment Element of the Comprehensive Plan for the National Capital: Federal Elements. The Comprehensive... required by law. The Federal Environment Element articulates policies that guide federal actions on...

  5. 78 FR 79004 - Notice of Availability of the Wyoming Greater Sage-Grouse Draft Land Use Plan Amendments and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ..., and Thunder Basin National Grassland Planning Units and by this notice is announcing the opening of... the Thunder Basin National Grassland. Current management decisions for resources are described in the... Forest LRMP (1990) Medicine Bow National Forest LRMP (2003) Thunder Basin National Grassland LRMP (2002...

  6. 76 FR 35466 - Notice of Public Meeting, Boise District Resource Advisory Council, Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ...'s Resource Management Plan Subgroup on its collaborative actions following the RAC Symposium. Discussion on draft sections of the Four Fivers Field Office Resource Management Plan (RMP) and Bruneau RMP... the Owyhee Public Lands Management Act and actions in each field office. Agenda items and location may...

  7. Radiological Defense. Planning and Operations Guide. Revised.

    ERIC Educational Resources Information Center

    Office of Civil Defense (DOD), Washington, DC.

    This guide is a reprint of published and draft materials from the Federal Civil Defense Guide. This guide is intended to assist the student in planning, developing, implementing and operating a local, county, or state radiological defense (RADEF) system. The state and local radiological defense program objectives are to create an effective and…

  8. Federal global change data plan reviewed

    NASA Astrophysics Data System (ADS)

    Simarski, Lynn Teo

    1992-02-01

    Scientists and data managers are grappling with an unprecedented challenge: how to handle the explosion of data being produced by global change research. The federal government is developing a plan to manage data among the various federal agencies that participate in the U.S. Global Change Research Program. From January 22 to 24, some 80 scientists, data managers, and officials from federal agencies, universities, laboratories, and other institutions met in Washington, D.C. to critique the draft plan. New observational tools are expected to increase the flow of global change data to ever more massive proportions, while all the data now available is not catalogued properly. Even now, if a researcher does manage to find appropriate data, it may not be documented sufficiently to use. “These practical difficulties are especially acute for global change researchers, who need to search for data and information very broadly across scientific disciplines and sometimes decades after the data were archived,” explains the draft plan by the Committee on Earth and Environmental Sciences of the Office of Science and Technology Policy.

  9. Microgravity strategic planning exercise

    NASA Technical Reports Server (NTRS)

    Halpern, Richard; Downey, Jim; Harvey, Harold

    1991-01-01

    The Center for Space and Advanced Technology supported a planning exercise for the Microgravity Program management at the Marshall Space Flight Center. The effort focused on the status of microgravity work at MSFC and elsewhere with the objective of preparing a goal-oriented strategic planning document which could be used for informational/brochure purposes. The effort entailed numerous interactions and presentations with Field Center programmatic components and Headquarters personnel. Appropriate material was consolidated in a draft format for a MSFC Strategic Plan.

  10. Draft Site Treatment Plan (DSTP), Volumes I and II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D`Amelio, J.

    1994-08-30

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilitiesmore » is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.« less

  11. 77 FR 44617 - Sunshine Act Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ...-24: Dean Peterson. Draft Advisory Opinion 2012-26: m-Qube, Inc., ArmourMedia, Inc. and Cooper for Congress Committee. Management and Administrative Matters. Individuals who plan to attend and require...

  12. Engaging Students in GeoPRISMS Science Planning: Preparing the Leaders of Tomorrow

    NASA Astrophysics Data System (ADS)

    Henning, A. T.; Benoit, M. H.; Marshall, J.; Goodliffe, A. M.; Morgan, J. K.; Bopp, C. J.

    2011-12-01

    GeoPRISMS is the legacy of the NSF MARGINS Program. It is a new decadal program, funded by NSF, committed to the amphibious study of the origin and evolution of continental margins through interdisciplinary, community-based investigations. MARGINS and GeoPRISMS have had notable success in fostering this team-based approach in graduate students who then continue on to become GeoPRISMS PIs. GeoPRISMS is enhancing its student outreach efforts through the development of a student symposium program, in which graduate students are invited to be more active participants in GeoPRISMS workshops, and are provided with valuable background and reference materials to enable them. This approach has been applied and updated at four GeoPRISMS workshops so far: two implementation workshops and two science planning workshops. Graduate students participated in the GeoPRISMS Rift Initiation and Evolution (RIE) implementation workshop in November 2010 and the Subduction Cycles and Deformation (SCD) workshop in January 2011, contributing to the overall design of the GeoPRISMS research program, and the selection of primary sites for study. In addition to participating in the regular meeting activities, students gave "pop-up" presentations to summarize their research and poster presentations and also worked together to develop their own draft implementation plan that was presented to the larger audience. Students responded positively to the experience of drafting their own implementation plans, which fostered a sense of community among participants and created an environment in which students felt comfortable speaking up during the meeting. Scientists attending the workshops were impressed by the students' draft implementation plans, as well as their work ethic and enthusiasm, and felt they made a very positive contribution to the workshops. Student feedback suggested providing students with a better understanding of the main scientific questions addressed at the meeting, as well as possible career paths. The sequestration of students during the workshop also raised concerns that they missed opportunities for broader community interactions. In Fall 2011, students participated in two symposia associated with the GeoPRISMS Alaska and Eastern North American Margin primary site planning workshops. The fall symposia followed a different model based on feedback from the first two workshops. A full day of activities took place prior to the workshop, including short presentations by experts in the field to provide background, a half-day field trip to enhance cohort-building, and student-only poster sessions and discussions. This approach allowed the students to participate fully in the meeting itself, with a stronger base of knowledge about the workshop topics and a larger network of colleagues.

  13. Guide to Rebuilding Governance in Stability Operations: A Role for the Military?

    DTIC Science & Technology

    2009-06-01

    departments to assess needs, develop a list of necessary parts and equipment, and prepare an action plan for restoration of services. With rapid...for drafting, reviewing, and voting on a new constitution was pursued. The Rwandan government’s action plan included: training and sensitization of...together to build collaborative relationships, share strategies for addressing obstacles, and develop joint action plans . Provide opportunities for CSOs to

  14. 78 FR 16655 - Draft Damage Assessment, Restoration Plan and Environmental Assessment for the T/B DBL 152 Oil...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ..., Restoration Plan and Environmental Assessment for the T/B DBL 152 Oil Spill in the Gulf of Mexico AGENCY... Damage Assessment and Restoration Plan and Environmental Assessment for the T/B DBL 152 Oil Spill in the..., T/B DBL 152 oil spill in the Gulf of Mexico. The purpose of this notice is to inform the public of...

  15. Health impact assessment as an agent of policy change: improving the health impacts of the mayor of London's draft transport strategy.

    PubMed

    Mindell, J; Sheridan, L; Joffe, M; Samson-Barry, H; Atkinson, S

    2004-03-01

    To increase the positive and mitigate the negative health impacts of the mayor's draft transport strategy for London. A rapid prospective health impact assessment (HIA) of the penultimate draft of the strategy, using a review commissioned by the regional director of public health; an appraisal of congestion charging; and a participatory workshop. Two audits of changes were performed to assess the impact on policy of the HIA process. Regional government policy development. Recommendations from the rapid HIA were fed back into the drafting process. Changes (a) between the penultimate draft and the draft for public consultation and (b) between that and the final mayoral strategy. The draft transport strategy published for consultation differed in a number of respects from the previous version. Almost all the recommendations from the HIA were incorporated into the final strategy. Significant changes included promoting sustainable travel plans for workplaces and schools; giving priority to infrastructure and services that benefit London's deprived communities; increased emphasis on promoting walking and cycling and reducing reliance on private cars; and a commitment to track the health impacts of the final strategy and its implementation. Specific additions included re-allocating road space. HIA was successful in influencing the transport strategy for London, resulting in several improvements from a health viewpoint. HIA is an effective method both for bringing about significant change in policy proposals and in increasing policy makers' understanding of determinants of health and hence in changing attitudes of policy makers.

  16. Development of a questionnaire for assessing factors predicting blood donation among university students: a pilot study.

    PubMed

    Jalalian, Mehrdad; Latiff, Latiffah; Hassan, Syed Tajuddin Syed; Hanachi, Parichehr; Othman, Mohamed

    2010-05-01

    University students are a target group for blood donor programs. To develop a blood donation culture among university students, it is important to identify factors used to predict their intent to donate blood. This study attempted to develop a valid and reliable measurement tool to be employed in assessing variables in a blood donation behavior model based on the Theory of Planned Behavior (TPB), a commonly used theoretical foundation for social psychology studies. We employed an elicitation study, in which we determined the commonly held behavioral and normative beliefs about blood donation. We used the results of the elicitation study and a standard format for creating questionnaire items for all constructs of the TPB model to prepare the first draft of the measurement tool. After piloting the questionnaire, we prepared the final draft of the questionnaire to be used in our main study. Examination of internal consistency using Chronbach's alpha coefficient and item-total statistics indicated the constructs "Intention" and "Self efficacy" had the highest reliability. Removing one item from each of the constructs, "Attitude," "Subjective norm," "Self efficacy," or "Behavioral beliefs", can considerably increase the reliability of the measurement tool, however, such action is controversial, especially for the variables "attitude" and "subjective norm." We consider all the items of our first draft questionnaire in our main study to make it a reliable measurement tool.

  17. Strategic planning in Brazilian protected areas: Uses and adjustments.

    PubMed

    Barreto, Cristiane Gomes; Drummond, José Augusto L

    2017-09-15

    Management plans for protected areas commonly use strategic planning tools in their drafting. It is proposed that the adequate use of the instruments of planning and management of protected areas can improve their strategic competitiveness, providing greater financial and administrative independence, enabling them to be economically sustainable organizations. This study evaluated the application of concepts and strategy formulation, strategy principles and competitiveness, organizational diagnosis, strategic maps, scenarios, and other strategic planning instruments used for conservation management in Brazil. 25 management plans of 25 different protected areas were selected and studied, with special attention to the indicators used in each plan. Results indicate that there is a high suitability for the application of SP tools to the universe of protected areas, although management plans did not take full advantage of these tools. We also found that the broader use of these tools did not guarantee greater managerial effectiveness. We suggest that other governance variables beyond planning strategies must be improved, to ensure a better performance of protected areas. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

  19. IDA/OSD R&M (Institute for Defense Analyses/Office of the Secretary of Defense Reliability and Maintainability) Study Bibliography.

    DTIC Science & Technology

    1983-08-01

    30 -IOLW. c • o:,,tas z ".9’ IM moOm X-272 IDA... 30 -2 • . ,, ... .L.. . .i W . . .’ I".• : V.*.’’. ;, .. . ... ," ... ,. . - 4..; ,,, .,, R&M STUDY,. DOCUMENTS LIST ( by Subject )-.:,’.i AS OF: 22...DE60. Maintainability Standardization Document Program Plan, Revision 1, Draft, DoD, 30 April 1982. DE82. Acquisition and Management of

  20. 78 FR 67390 - Early Scoping for Proposed Application for Incidental Take Permit and Habitat Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ...; Pennsylvania Game Commission and Pennsylvania Department of Conservation and Natural Resources AGENCY: Fish and...) application and associated draft habitat conservation plan (HCP) from the Pennsylvania Game Commission (PGC... lands. PGC manages 1.4 million acres of State Game Lands, and DCNR manages 2.2 million acres of State...

  1. 76 FR 16634 - Seal Beach National Wildlife Refuge, Orange County, CA; Draft Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-R-2010-N272; 81683-1265-0000-S3] Seal... comprehensive conservation plan (CCP) and environmental assessment (EA) for the Seal Beach National Wildlife....gov . Include ``Seal Beach CCP'' in the subject line of the message. Fax: Attn: Victoria Touchstone...

  2. Updates to Information Presented in the Scope and Methods Plans for the Ozone NAAQS Health and Welfare Risk and Exposure Assessments, May 2012 Memo

    EPA Pesticide Factsheets

    This memorandum provides an overview of changes to the scope and methods plan, and reasons for them, to inform the CASAC Ozone Panel and the public as they prepare to review the first drafts of the Risk and Exposure Assessments.

  3. 75 FR 36435 - Notice of Availability of the Draft Winnemucca District Resource Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVW00000 L16100000.DP0000 LXSS015F0000... Resource Management Plan and Environmental Impact Statement, Nevada AGENCY: Bureau of Land Management... of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau...

  4. 77 FR 60457 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2012-N225; FXES11120300000F2-123... Area; Reopening of Comment Period AGENCY: Fish and Wildlife Service, Interior. ACTION: Reopening of public comment period. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), advise the public that...

  5. 76 FR 62089 - General Management Plan/Abbreviated Final Environmental Impact Statement, New River Gorge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge National River, West..., and interpretation of park resources over the next 20 years. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets...

  6. 76 FR 62832 - Draft Environmental Impact Statement for General Management Plan, Blue Ridge Parkway, VA and NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... General Management Plan (GMP) for Blue Ridge Parkway (parkway). Consistent with NPS laws, regulations, and policies and the purpose of the parkway, the DEIS/GMP describes the NPS preferred alternative-- Alternative... public on the DEIS/GMP for at least 60 days, starting from the date the Environmental Protection Agency...

  7. 78 FR 9387 - Notice of Availability for Public Review and Comment: Draft EPA Climate Change Adaptation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... protect human health and the environment. Many of the goals EPA is working to attain (e.g., clean air... identifying and responding to the challenges that a changing climate poses to human health and the environment... environment. Adaptation will involve anticipating and planning for changes in climate and incorporating...

  8. 75 FR 10307 - Notice of Availability of a Draft Environmental Impact Statement for Cape Hatteras National Seashore

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... for the Cape Hatteras National Seashore (Seashore) Off-Road Vehicle Management Plan (Plan/EIS). The... off-road vehicle (ORV) use/access in the Seashore to protect and preserve natural and cultural... among various users, and to promote the safety of all visitors. Executive Order 11644 of 1972, amended...

  9. 75 FR 51487 - Office of the Assistant Secretary for Administration and Management; Notice of Online Posting of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... DEPARTMENT OF LABOR Office of the Assistant Secretary for Administration and Management; Notice of Online Posting of Department of Labor's Revised Draft Strategic Plan for Fiscal Years 2011-2016 Pursuant... Labor is required to submit its Strategic Plan for Fiscal Years 2011-2016 to the Director of the Office...

  10. Draft Plan of Operation for a Functional Literacy Pilot Program in Swaziland June-July 1971.

    ERIC Educational Resources Information Center

    Sebenta National Inst. (Swaziland).

    A planned full-time "functional literacy" course that was to be held during June and July 1971 in Ekuhlamukeni and Nqabaneni (Swaziland) is discussed. The experimental pilot project was to be sponsored by the Sebenta National Institute, the University of Botswana, Lesotho and Swaziland Division of Extra Mural Services, and by the…

  11. An open dialogue on the draft focus and themes for the next ITS strategic research plan : engaging stakeholders in their discussion and development.

    DOT National Transportation Integrated Search

    2012-12-01

    The purpose of this document is to identify the focus and themes for the next installment of the ITS Strategic Research Plan and to invite stakeholders to participate in their discussion. The goal of presenting themes is to enable continuity of the c...

  12. Publication Guidelines for Quality Improvement Studies in Health Care: Evolution of the SQUIRE Project

    PubMed Central

    Batalden, Paul; Stevens, David; Ogrinc, Greg; Mooney, Susan

    2008-01-01

    In 2005 we published draft guidelines for reporting studies of quality improvement interventions as the initial step in a consensus process for development of a more definitive version. The current article contains the revised version, which we refer to as SQUIRE (Standards for QUality Improvement Reporting Excellence). We describe the consensus process, which included informal feedback, formal written commentaries, input from publication guideline developers, review of the literature on the epistemology of improvement and on methods for evaluating complex social programs, and a meeting of stakeholders for critical review of the guidelines’ content and wording, followed by commentary on sequential versions from an expert consultant group. Finally, we examine major differences between SQUIRE and the initial draft, and consider limitations of and unresolved questions about SQUIRE; we also describe ancillary supporting documents and alternative versions under development, and plans for dissemination, testing, and further development of SQUIRE. PMID:18830766

  13. Overview of the Higher Education Systems in the Tempus Partner Countries: Western Balkans. A Tempus Study. Issue 06

    ERIC Educational Resources Information Center

    Ruffio, Philippe; Heinamaki, Piia; Tchoukaline, Claire Chastang; Manthey, Anja; Reichboth, Veronika

    2011-01-01

    The attached descriptions of higher education systems in the Tempus partner countries provide a tool for those who are either planning or already carrying out projects within Tempus. This document forms part of a series of four publications which have been produced for each of the regions covered by Tempus. The descriptions have been drafted by…

  14. Overview of the Higher Education Systems in the Tempus Partner Countries: Southern Mediterranean. A Tempus Study. Issue 07

    ERIC Educational Resources Information Center

    Ruffio, Philippe; Heinamaki, Piia; Tchoukaline, Claire Chastang; Manthey, Anja; Reichboth, Veronika

    2011-01-01

    The attached descriptions of higher education systems in the Tempus partner countries provide a tool for those who are either planning or already carrying out projects within Tempus. This document forms part of a series of four publications which have been produced for each of the regions covered by Tempus. The descriptions have been drafted by…

  15. 78 FR 47003 - Draft National Spatial Data Infrastructure Strategic Plan; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... NSDI.'' Executive Order 12906 describes the NSDI as ``the technology, policies, standards, and human resources necessary to acquire, process, store, distribute, and improve utilization of geospatial data...

  16. 75 FR 80807 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ..., CA, East County Substation/Tule Wind/ Energia Sierra Juarez Gen-Tie Projects, Construction and.... 20100462, Draft EIS, FWS, CA, Santa Clara Valley Habitat Plan, To Protect and Enhance Ecological Diversity...

  17. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  18. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  19. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  20. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

Top