Code of Federal Regulations, 2011 CFR
2011-07-01
... tanks with a total capacity to meet the draft and trim requirements in paragraph (d) of this section; or...) Segregated ballast tanks with a total capacity to meet the draft and trim requirements in paragraph (d) of... trim requirements in paragraph (d) of this section and that meet the design and equipment requirements...
Code of Federal Regulations, 2010 CFR
2010-07-01
... tanks with a total capacity to meet the draft and trim requirements in paragraph (d) of this section; or...) Segregated ballast tanks with a total capacity to meet the draft and trim requirements in paragraph (d) of... trim requirements in paragraph (d) of this section and that meet the design and equipment requirements...
Tuck, Geoffrey N; Whitten, Athol R
2013-01-01
Annual draft systems are the principal method used by teams in major sporting leagues to recruit amateur players. These draft systems frequently take one of three forms: a lottery style draft, a weighted draft, or a reverse-order draft. Reverse-order drafts can create incentives for teams to deliberately under-perform, or tank, due to the perceived gain from obtaining quality players at higher draft picks. This paper uses a dynamic simulation model that captures the key components of a win-maximising sporting league, including the amateur player draft, draft choice error, player productivity, and between-team competition, to explore how competitive balance and incentives to under-perform vary according to league characteristics. We find reverse-order drafts can lead to some teams cycling between success and failure and to other teams being stuck in mid-ranking positions for extended periods of time. We also find that an incentive for teams to tank exists, but that this incentive decreases (i) as uncertainty in the ability to determine quality players in the draft increases, (ii) as the number of teams in the league reduces, (iii) as team size decreases, and (iv) as the number of teams adopting a tanking strategy increases. Simulation models can be used to explore complex stochastic dynamic systems such as sports leagues, where managers face difficult decisions regarding the structure of their league and the desire to maintain competitive balance.
Tuck, Geoffrey N.; Whitten, Athol R.
2013-01-01
Annual draft systems are the principal method used by teams in major sporting leagues to recruit amateur players. These draft systems frequently take one of three forms: a lottery style draft, a weighted draft, or a reverse-order draft. Reverse-order drafts can create incentives for teams to deliberately under-perform, or tank, due to the perceived gain from obtaining quality players at higher draft picks. This paper uses a dynamic simulation model that captures the key components of a win-maximising sporting league, including the amateur player draft, draft choice error, player productivity, and between-team competition, to explore how competitive balance and incentives to under-perform vary according to league characteristics. We find reverse-order drafts can lead to some teams cycling between success and failure and to other teams being stuck in mid-ranking positions for extended periods of time. We also find that an incentive for teams to tank exists, but that this incentive decreases (i) as uncertainty in the ability to determine quality players in the draft increases, (ii) as the number of teams in the league reduces, (iii) as team size decreases, and (iv) as the number of teams adopting a tanking strategy increases. Simulation models can be used to explore complex stochastic dynamic systems such as sports leagues, where managers face difficult decisions regarding the structure of their league and the desire to maintain competitive balance. PMID:24312243
Code of Federal Regulations, 2011 CFR
2011-07-01
... to meet the draft and trim requirements in § 157.09(b); or (2) A crude oil washing system that meets... trim requirements in § 157.09(b); or (2) Dedicated clean ballast tanks that meet the design and... meet the draft and trim requirements in § 157.09(b). (d) If the arrangement of tanks on a vessel under...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to meet the draft and trim requirements in § 157.09(b); or (2) A crude oil washing system that meets... trim requirements in § 157.09(b); or (2) Dedicated clean ballast tanks that meet the design and... meet the draft and trim requirements in § 157.09(b). (d) If the arrangement of tanks on a vessel under...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lipus, Daniel; Ross, Daniel; Bibby, Kyle
We report the 5,425,832 bp draft genome ofPseudomonassp. strain BDAL1, recovered from a Bakken shale hydraulic fracturing-produced water tank metagenome. Genome annotation revealed several key biofilm formation genes and osmotic stress response mechanisms necessary for survival in hydraulic fracturing-produced water.
Lipus, Daniel; Ross, Daniel; Bibby, Kyle; ...
2017-03-16
We report the 5,425,832 bp draft genome ofPseudomonassp. strain BDAL1, recovered from a Bakken shale hydraulic fracturing-produced water tank metagenome. Genome annotation revealed several key biofilm formation genes and osmotic stress response mechanisms necessary for survival in hydraulic fracturing-produced water.
Lipus, Daniel; Ross, Daniel
2017-01-01
ABSTRACT We report the 5,425,832 bp draft genome of Pseudomonas sp. strain BDAL1, recovered from a Bakken shale hydraulic fracturing-produced water tank metagenome. Genome annotation revealed several key biofilm formation genes and osmotic stress response mechanisms necessary for survival in hydraulic fracturing-produced water. PMID:28302780
49 CFR 179.400-13 - Support system for inner tank.
Code of Federal Regulations, 2012 CFR
2012-10-01
... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and... directions when the inner tank is fully loaded and the car is equipped with a conventional draft gear... the support system, piping, or a separate electrical connection of approved design. ...
49 CFR 179.400-13 - Support system for inner tank.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and... directions when the inner tank is fully loaded and the car is equipped with a conventional draft gear... the support system, piping, or a separate electrical connection of approved design. ...
49 CFR 179.400-13 - Support system for inner tank.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and... directions when the inner tank is fully loaded and the car is equipped with a conventional draft gear... the support system, piping, or a separate electrical connection of approved design. ...
49 CFR 179.400-13 - Support system for inner tank.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and... directions when the inner tank is fully loaded and the car is equipped with a conventional draft gear... the support system, piping, or a separate electrical connection of approved design. ...
Lipus, Daniel; Ross, Daniel; Bibby, Kyle; Gulliver, Djuna
2017-03-16
We report the 5,425,832 bp draft genome of Pseudomonas sp. strain BDAL1, recovered from a Bakken shale hydraulic fracturing-produced water tank metagenome. Genome annotation revealed several key biofilm formation genes and osmotic stress response mechanisms necessary for survival in hydraulic fracturing-produced water. Copyright © 2017 Lipus et al.
46 CFR 35.20-5 - Draft of tankships-T/OC.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Draft of tankships-T/OC. 35.20-5 Section 35.20-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Navigation § 35.20-5 Draft of tankships—T/OC. The master of every tankship shall, whenever leaving port, enter the maximum draft of his...
46 CFR 35.20-5 - Draft of tankships-T/OC.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Draft of tankships-T/OC. 35.20-5 Section 35.20-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Navigation § 35.20-5 Draft of tankships—T/OC. The master of every tankship shall, whenever leaving port, enter the maximum draft of his...
46 CFR 35.20-5 - Draft of tankships-T/OC.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Draft of tankships-T/OC. 35.20-5 Section 35.20-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Navigation § 35.20-5 Draft of tankships—T/OC. The master of every tankship shall, whenever leaving port, enter the maximum draft of his...
46 CFR 35.20-5 - Draft of tankships-T/OC.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Draft of tankships-T/OC. 35.20-5 Section 35.20-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Navigation § 35.20-5 Draft of tankships—T/OC. The master of every tankship shall, whenever leaving port, enter the maximum draft of his...
46 CFR 35.20-5 - Draft of tankships-T/OC.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Draft of tankships-T/OC. 35.20-5 Section 35.20-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Navigation § 35.20-5 Draft of tankships—T/OC. The master of every tankship shall, whenever leaving port, enter the maximum draft of his...
Code of Federal Regulations, 2010 CFR
2010-07-01
... capability of meeting each of the following: (1) The molded draft amidship (dm), in meters, without taking...: dm=2.00+0.020L for vessels of 150 meters or more in length dm=1.25+0.025L for vessels less than 150 meters in length (2) The drafts, in meters, at the forward and after perpendiculars must correspond to...
Hirst, Deborah V.L.; Dunn, Kevin H.; Shulman, Stanley A.; Hammond, Duane R.; Sestito, Nicholas
2015-01-01
Exposures to diacetyl, a primary ingredient of butter flavoring, have been shown to cause respiratory disease among workers who mix flavorings. This study focused on evaluating ventilation controls designed to reduce emissions from the flavor mixing tanks, the major source of diacetyl in the plants. Five exhaust hood configurations were evaluated in the laboratory: standard hinged lid-opened, standard hinged lid-closed, hinged lid-slotted, dome with 38-mm gap, and dome with 114-mm gap. Tracer gas tests were performed to evaluate quantitative capture efficiency for each hood. A perforated copper coil was used to simulate an area source within the 1.2-meter diameter mixing tank. Capture efficiencies were measured at four hood exhaust flow rates (2.83, 5.66, 11.3, and 17.0 cubic meters per minute) and three cross draft velocities (0, 30, and 60 meters per minute). All hoods evaluated performed well with capture efficiencies above 90% for most combinations of exhaust volume and cross drafts. The standard hinged lid was the least expensive to manufacture and had the best average capture efficiency (over 99%) in the closed configuration for all exhaust flow rates and cross drafts. The hinged lid-slotted hood had some of the lowest capture efficiencies at the low exhaust flow rates compared to the other hood designs. The standard hinged lid performed well, even in the open position, and it provided a flexible approach to controlling emissions from mixing tanks. The dome hood gave results comparable to the standard hinged lid but it is more expensive to manufacture. The results of the study indicate that emissions from mixing tanks used in the production of flavorings can be controlled using simple inexpensive exhaust hoods. PMID:24649880
CFD simulation of mechanical draft tube mixing in anaerobic digester tanks.
Meroney, Robert N; Colorado, P E
2009-03-01
Computational Fluid Dynamics (CFD) was used to simulate the mixing characteristics of four different circular anaerobic digester tanks (diameters of 13.7, 21.3, 30.5, and 33.5m) equipped with single and multiple draft impeller tube mixers. Rates of mixing of step and slug injection of tracers were calculated from which digester volume turnover time (DVTT), mixture diffusion time (MDT), and hydraulic retention time (HRT) could be calculated. Washout characteristics were compared to analytic formulae to estimate any presence of partial mixing, dead volume, short-circuiting, or piston flow. CFD satisfactorily predicted performance of both model and full-scale circular tank configurations.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-07
... waste storage tanks and supporting ancillary structures. Two of those waste tanks, Tanks 17 and 20 were... available for public review and comment. DATES: The comment period will end on January 7, 2011. Comments... structures are two evaporator systems, transfer lines, six diversion boxes, one catch tank, a concentrate...
46 CFR 32.56-45 - Draft stops-T/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Draft stops-T/ALL. 32.56-45 Section 32.56-45 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL....56-45 Draft stops—T/ALL. (a) Where ceilings or linings are fitted in accommodation, service, or...
46 CFR 32.56-45 - Draft stops-T/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Draft stops-T/ALL. 32.56-45 Section 32.56-45 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL....56-45 Draft stops—T/ALL. (a) Where ceilings or linings are fitted in accommodation, service, or...
33 CFR 157.09 - Segregated ballast.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) POLLUTION RULES FOR THE PROTECTION OF THE MARINE ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK... more must have segregated ballast tanks that have a total capacity to allow the vessel to meet the draft and trim requirements in paragraph (b) of this section without recourse to the use of oil tanks...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Management Environmental Impact Statement for the Hanford Site, Richland, WA AGENCY: Department of Energy... Statement for the Hanford Site, Richland, Washington (Draft EIS, DOE/EIS-00391), made available for public... Draft EIS is also available through the Hanford Web site at: http://www.hanford.gov/orp . Issued in...
75 FR 6018 - Environmental Management Site-Specific Advisory Board, Hanford
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... in the Draft Tank Closure (TC) and Waste Management (WM) Environmental Impact Statement (EIS) Overview of the Draft TC and WM EIS findings by other stakeholder groups Discussion of HAB member comments on the TC and WM EIS Development of HAB advice principles Adjourn Public Participation: The meeting...
Automatic draft reading based on image processing
NASA Astrophysics Data System (ADS)
Tsujii, Takahiro; Yoshida, Hiromi; Iiguni, Youji
2016-10-01
In marine transportation, a draft survey is a means to determine the quantity of bulk cargo. Automatic draft reading based on computer image processing has been proposed. However, the conventional draft mark segmentation may fail when the video sequence has many other regions than draft marks and a hull, and the estimated waterline is inherently higher than the true one. To solve these problems, we propose an automatic draft reading method that uses morphological operations to detect draft marks and estimate the waterline for every frame with Canny edge detection and a robust estimation. Moreover, we emulate surveyors' draft reading process for getting the understanding of a shipper and a receiver. In an experiment in a towing tank, the draft reading error of the proposed method was <1 cm, showing the advantage of the proposed method. It is also shown that accurate draft reading has been achieved in a real-world scene.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-08
... ending March 19, 2010. The State of Washington, Department of Ecology (Ecology) is a cooperating agency.... For general questions and information about the Washington State Department of Ecology, contact... Ecology as a cooperating agency, prepared the Draft TC & WM EIS in accordance with the Council on...
CFD simulation of vertical linear motion mixing in anaerobic digester tanks.
Meroney, Robert N; Sheker, Robert E
2014-09-01
Computational fluid dynamics (CFD) was used to simulate the mixing characteristics of a small circular anaerobic digester tank (diameter 6 m) equipped sequentially with 13 different plunger type vertical linear motion mixers and two different type internal draft-tube mixers. Rates of mixing of step injection of tracers were calculated from which active volume (AV) and hydraulic retention time (HRT) could be calculated. Washout characteristics were compared to analytic formulae to estimate any presence of partial mixing, dead volume, short-circuiting, or piston flow. Active volumes were also estimated based on tank regions that exceeded minimum velocity criteria. The mixers were ranked based on an ad hoc criteria related to the ratio of AV to unit power (UP) or AV/UP. The best plunger mixers were found to behave about the same as the conventional draft-tube mixers of similar UP.
Summary of Research, Academic Departments, 1982-1983.
1983-10-01
Office to pursue fur- - and the production of towing tank models is de - ther proof of concept tests and seek improvements ,’ scribed. The design...followed b" Haskind. Rci,,ncr. * as "Cable Fire Studies: Progress Report in Evaluation of Timman, van de Vooren and Greidanus. and Release Rate Apparatus...diameter of the in the capture chamber have been compared with a system is increased, the draft of the device is de - limited amount of experimental data
Fire Safety Tests for Cesium-Loaded Spherical Resorcinol Formaldehyde Resin: Data Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Dong-Sang; Schweiger, Michael J.; Peterson, Reid A.
2012-09-01
A draft safety evaluation of the scenario for spherical resorcinol formaldehyde (SRF) resin fire inside the ion exchange column was performed by the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Fire Safety organization. The result of this draft evaluation suggested a potential change of the fire safety classification for the Cesium Ion Exchange Process System (CXP) emergency elution vessels, equipment, and piping. To resolve this question, the fire properties of the SRF resin were measured by Southwest Research Institute (SwRI) through a subcontract managed by Pacific Northwest National Laboratory (PNNL). The results of initial fire safety tests on themore » SRF resin were documented in a previous report (WTP-RPT-218). The present report summarizes the results of additional tests performed by SwRI on the cesium-loaded SRF resin. The efforts by PNNL were limited to summarizing the test results provided by SwRI into one consolidated data report. The as-received SwRI report is attached to this report in the Appendix A. Where applicable, the precision and bias of each test method, as given by each American Society for Testing and Materials (ASTM) standard procedure, are included and compared with the SwRI test results of the cesium-loaded SRF resin.« less
Li, Zhengkai; Lee, Kenneth; King, Thomas; Boufadel, Michel C; Venosa, Albert D
2008-05-01
Current chemical dispersant effectiveness tests for product selection are commonly performed with bench-scale testing apparatus. However, for the assessment of oil dispersant effectiveness under real sea state conditions, test protocols are required to have hydrodynamic conditions closer to the natural environment, including transport and dilution effects. To achieve this goal, Fisheries and Oceans Canada and the US Environmental Protection Agency (EPA) designed and constructed a wave tank system to study chemical dispersant effectiveness under controlled mixing energy conditions (regular non-breaking, spilling breaking, and plunging breaking waves). Quantification of oil dispersant effectiveness was based on observed changes in dispersed oil concentrations and oil-droplet size distribution. The study results quantitatively demonstrated that total dispersed oil concentration and breakup kinetics of oil droplets in the water column were strongly dependent on the presence of chemical dispersants and the influence of breaking waves. These data on the effectiveness of dispersants as a function of sea state will have significant implications in the drafting of future operational guidelines for dispersant use at sea.
MO-F-16A-01: Implementation of MPPG TPS Verification Tests On Various Accelerators
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smilowitz, J; Bredfeldt, J; Geurts, M
2014-06-15
Purpose: To demonstrate the implementation of the Medical Physics Practice Guideline (MPPG) for dose calculation and beam parameters verification of treatment planning systems (TPS). Methods: We implemented the draft TPS MPPG for three linacs: Varian Trilogy, TomoHDA and Elekta Infinity. Static and modulated test plans were created. The static fields are different than used in commissioning. Data was collected using ion chambers and diodes in a scanning water tank, Delta4 phantom and a custom phantom. MatLab and Microsoft Excel were used to create analysis tools to compare reference DICOM dose with scan data. This custom code allowed for the interpolation,more » registration and gamma analysis of arbitrary dose profiles. It will be provided as open source code. IMRT fields were validated with Delta4 registration and comparison tools. The time for each task was recorded. Results: The tests confirmed the strengths, and revealed some limitations, of our TPS. The agreement between calculated and measured dose was reported for all beams. For static fields, percent depth dose and profiles were analyzed with criteria in the draft MPPG. The results reveal areas of slight mismatch with the model (MLC leaf penumbra, buildup region.) For TomoTherapy, the IMRT plan 2%/2 mm gamma analysis revealed poorest agreement in the low dose regions. For one static test plan for all 10MV Trilogy photon beams, the plan generation, scan queue creation, data collection, data analysis and report took 2 hours, excluding tank setup. Conclusions: We have demonstrated the implementation feasibility of the TPS MPPG. This exercise generated an open source tool for dose comparisons between scan data and DICOM dose data. An easily reproducible and efficient infrastructure with streamlined data collection was created for repeatable robust testing of the TPS. The tests revealed minor discrepancies in our models and areas for improvement that are being investigated.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bauer, Roger E.; Figley, Reed R.; Innes, A. G.
2013-11-11
A history of the evolution and the design development of Extended Reach Sluicer System (ERSS) is presented. Several challenges are described that had to be overcome to create a machine that went beyond the capabilities of prior generation sluicers to mobilize waste in Single Shell Tanks for pumping into Double Shell Tank receiver tanks. Off-the-shelf technology and traditional hydraulic fluid power systems were combined with the custom-engineered components to create the additional functionality of the ERSS, while still enabling it to fit within very tight entry envelope into the SST. Problems and challenges inevitably were encountered and overcome in waysmore » that enhance the state of the art of fluid power applications in such constrained environments. Future enhancements to the ERSS design are explored for retrieval of tanks with different dimensions and internal obstacles.« less
Enhanced Chemical Cleaning: A New Process for Chemically Cleaning Savannah River Waste Tanks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ketusky, Edward; Spires, Renee; Davis, Neil
2009-02-11
At the Savannah River Site (SRS) there are 49 High Level Waste (HLW) tanks that eventually must be emptied, cleaned, and closed. The current method of chemically cleaning SRS HLW tanks, commonly referred to as Bulk Oxalic Acid Cleaning (BOAC), requires about a half million liters (130,000 gallons) of 8 weight percent (wt%) oxalic acid to clean a single tank. During the cleaning, the oxalic acid acts as the solvent to digest sludge solids and insoluble salt solids, such that they can be suspended and pumped out of the tank. Because of the volume and concentration of acid used, amore » significant quantity of oxalate is added to the HLW process. This added oxalate significantly impacts downstream processing. In addition to the oxalate, the volume of liquid added competes for the limited available tank space. A search, therefore, was initiated for a new cleaning process. Using TRIZ (Teoriya Resheniya Izobretatelskikh Zadatch or roughly translated as the Theory of Inventive Problem Solving), Chemical Oxidation Reduction Decontamination with Ultraviolet Light (CORD-UV{reg_sign}), a mature technology used in the commercial nuclear power industry was identified as an alternate technology. Similar to BOAC, CORD-UV{reg_sign} also uses oxalic acid as the solvent to dissolve the metal (hydr)oxide solids. CORD-UV{reg_sign} is different, however, since it uses photo-oxidation (via peroxide/UV or ozone/UV to form hydroxyl radicals) to decompose the spent oxalate into carbon dioxide and water. Since the oxalate is decomposed and off-gassed, CORD-UV{reg_sign} would not have the negative downstream oxalate process impacts of BOAC. With the oxalate destruction occurring physically outside the HLW tank, re-precipitation and transfer of the solids, as well as regeneration of the cleaning solution can be performed without adding additional solids, or a significant volume of liquid to the process. With a draft of the pre-conceptual Enhanced Chemical Cleaning (ECC) flowsheet, taking full advantage of the many CORD-UV{reg_sign} benefits, performance demonstration testing was initiated using available SRS sludge simulant. The demonstration testing confirmed that ECC is a viable technology, as it can dissolve greater than 90% of the sludge simulant and destroy greater than 90% of the oxalates. Additional simulant and real waste testing are planned.« less
Fire Safety Tests for Spherical Resorcinol Formaldehyde Resin: Data Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Dong-Sang; Peterson, Reid A.; Schweiger, Michael J.
2012-07-30
A draft safety evaluation of the scenario for spherical resorcinol-formaldehyde (SRF) resin fire inside the ion exchange column was performed by the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Fire Safety organization. The result of this draft evaluation suggested a potential change of the fire safety classification for the Cesium Ion Exchange Process System (CXP) emergency elution vessels, equipment, and piping, which may be overly bounding based on the fire performance data from the manufacturer of the ion exchange resin selected for use at the WTP. To resolve this question, the fire properties of the SRF resin were measuredmore » by Southwest Research Institute (SwRI), following the American Society for Testing and Materials (ASTM) standard procedures, through a subcontract managed by Pacific Northwest National Laboratory (PNNL). For some tests, the ASTM standard procedures were not entirely appropriate or practical for the SRF resin material, so the procedures were modified and deviations from the ASTM standard procedures were noted. This report summarizes the results of fire safety tests performed and reported by SwRI. The efforts by PNNL were limited to summarizing the test results provided by SwRI into one consolidated data report. All as-received SwRI reports are attached to this report in the Appendix. Where applicable, the precision and bias of each test method, as given by each ASTM standard procedure, are included and compared with the SwRI test results of the SRF resin.« less
Monitoring Conditions Leading to SCC/Corrosion of Carbon Steel in Fuel Grade Ethanol
DOT National Transportation Integrated Search
2011-02-11
This is the draft final report of the project on field monitoring of conditions that lead to SCC in ethanol tanks and piping. The other two aspects of the consolidated program, ethanol batching and blending effects (WP#325) and source effects (WP#323...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-25
... ending March 19, 2010. The State of Washington, Department of Ecology (Ecology) is a cooperating agency... and information about the Washington State Department of Ecology, contact: Annette Carlson, Nuclear... ultimate closure of Hanford. In support of Hanford's cleanup mission DOE, with Ecology as a cooperating...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-07
... in SJVUAPCD Rule 4455, ``Components at Petroleum Refineries, Gas Liquids Processing Facilities and... be added in Rule 4402 or Rule 4623 (Storage of Organic Liquids) that ensure that tanks used to... and Gas Industry Survey Results'', Draft Report, March 2011. Comment 8: SJVUAPCD commented that the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Evaluation of Recommended Practice on Fatigue Risk Management Systems for Personnel in the Refining and... and Health Administration: 2001-05-I-DE-1 (Process Safety Management coverage of atmospheric storage tanks); 2005-04-I-TX-9 (Process Safety Management requirement for organizational management of change...
Development of Automotive Liquid Hydrogen Storage Systems
NASA Astrophysics Data System (ADS)
Krainz, G.; Bartlok, G.; Bodner, P.; Casapicola, P.; Doeller, Ch.; Hofmeister, F.; Neubacher, E.; Zieger, A.
2004-06-01
Liquid hydrogen (LH2) takes up less storage volume than gas but requires cryogenic vessels. State-of-the-art applications for passenger vehicles consist of double-wall cylindrical tanks that hold a hydrogen storage mass of up to 10 kg. The preferred shell material of the tanks is stainless steel, since it is very resistant against hydrogen brittleness and shows negligible hydrogen permeation. Therefore, the weight of the whole tank system including valves and heat exchanger is more than 100 kg. The space between the inner and outer vessel is mainly used for thermal super-insulation purposes. Several layers of insulation foils and high vacuums of 10-3 Pa reduce the heat entry. The support structures, which keep the inner tank in position to the outer tank, are made of materials with low thermal conductivity, e.g. glass or carbon fiber reinforced plastics. The remaining heat in-leak leads to a boil-off rate of 1 to 3 percent per day. Active cooling systems to increase the stand-by time before evaporation losses occur are being studied. Currently, the production of several liquid hydrogen tanks that fulfill the draft of regulations of the European Integrated Hydrogen Project (EIHP) is being prepared. New concepts of lightweight liquid hydrogen storage tanks will be investigated.
ERIC Educational Resources Information Center
Brandon, Richard N.; Smith, Diana
This background paper discusses the current system of child care finance in Washington State and analyzes options for improvement. It describes prominent characteristics of the early childhood care and education system, findings relating program quality to staff/child ratios and staff educational levels, characteristics of quality, parent…
75 FR 22400 - Draft Test Guidelines; Reopening of Comment Period
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-28
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2009-0681; FRL-8822-3] Draft Test Guidelines... draft test guidelines for product performance of public health uses of antimicrobial agents. EPA...-8437-2). In that document, EPA announced the availability of four draft test guidelines for product...
Implementing Best Practices for Major Business Processes in the Department of Defense
2014-07-24
95 Figures and Tables Figure 1- Past budget declines following major military engagements...US Navy and COL Leslie Caballero, US Army served as the military representatives. APPROACH The Task Group’s draft findings and recommendations were...Group interviewed over 30 individuals from government, think tanks, and private industry, including current and recent DoD senior military and
Solar heating and hot water system installed at Saint Louis, Missouri
NASA Technical Reports Server (NTRS)
1980-01-01
The solar heating and hot water system installed at the William Tao & Associates, Inc., office building in St. Louis, Missouri is described, including maintenance and construction problems, final drawings, system requirements, and manufacturer's component data. The solar system was designed to provide 50 percent of the hot water requirements and 45 percent of the space heating needs for a 900 sq ft office space and drafting room. The solar facility has 252 sq ft of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.
Ema, Makoto; Fukui, Yoshihiro; Aoyama, Hiroaki; Fujiwara, Michio; Fuji, Junichiro; Inouye, Minoru; Iwase, Takayuki; Kihara, Takahide; Oi, Akihide; Otani, Hiroki; Shinomiya, Mitsuhiro; Sugioka, Kozo; Yamano, Tsunekazu; Yamashita, Keisuke H; Tanimura, Takashi
2007-06-01
In October 2006, a new revision of the draft guideline (OECD Guideline for the Testing of Chemicals, Proposal for a New Guideline 426. Developmental Neurotoxicity Study) and Draft Document of the Retrospective Performance Assessment (RPA) of the Draft Test Guideline 426 on Developmental Neurotoxicity were distributed following incorporation of the results of the Expert Consultation Meeting in Tokyo on May 24-26, 2005. The draft guideline consists of 50 paragraphs and an appendix with 102 references; and the draft RPA consists of 37 paragraphs with 109 references. National coordinators were requested to arrange for national expert reviews of these draft documents in their member countries. Members of the Developmental Neurotoxicology (DNT) Committee of the Japanese Teratology Society (JTS) reviewed, discussed, and commented on the draft Test Guideline Proposal. The DNT Committee of the JTS also commented on the draft document of the RPA. These comments were sent to the OECD Secretariat. The DNT Committee of the JTS expects the comments to be useful for the finalization of these draft documents.
630 A MARITIME NUCLEAR STEAM GENERATOR. Progress Report No. 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1962-09-28
A layout of a reduced-height 630A assembly (34 to 23 ft) was prepared and is presently being evaluated for use in a merchant vessel. While shielding studies indicate the need for some rearrangement of the shield materials, the desired radiation constraint can be obtained without an increase in shielding weight. A preliminary stress analysis of the pressure vessel, flow path analysis, and insulation evaluation was completed and showed no major problems. Evaluation of the total containment design indicates a design pressure of 45 psig. The Critical Experiment (CE) mockup is about 80% complete. The CE tank and dolly is aboutmore » 50% complete. The CE hazards report was reviewed and approved. The draft of the test program and procedures document is 75% complete. The LPT control room modifications were made, and the draft of the standard operating procedures completed. The CE fuel was inspected and a significant portion was found to be of no use, about 60% requires recoating. Creep and oxidation test time on some of the fuel sheet has exceeded 3000 hr with no significant oxidation or elongation on any of the samples. The nickel -chromium alloy sheet high- temperature (1750 F) stress and oxidating testing have exceeded 5000 hr with elongations below 0.8% except for one sample of 2.3%. Experimental fuel sheet samples were prepared and comparative property studies were ini-tiated. Fabrication of the ring test assembly, 3-F-1, for test in the MTR is essentially complete. The design of the test ring for seal evaluations was initiated. A detailed schedule for the work in FY 63 was prepared and issued for comments and concurrence. (auth)« less
TWRS vadose zone contamination issue expert panel report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shafer, D.S.
1997-05-01
When members were first canvassed for participation in the Vadose Zone Expert Panel the stated purpose for convening the Panel was to review a controversial draft report, the SX Tank Farm Report. This report was produced by a DOE Grand Junction Project Office (GJPO) contractor, RUST Geotech, now MACTEC-ERS, for the DOE Richland Office (DOERL). Three meetings were planned for June, July and August, 1995 to review the draft report and to complete a Panel report by mid-September. The Expert Panel has found its efforts confounded by various non-technical issues. The Expert Panel has chosen to address some of themore » non-technical issues in this Preface rather than to dilute the technical discussion that follows in the body of this independent expert panel status report (Panel Report). Rather than performing a straightforward manuscript review, the Panel was asked to resolve conflicting interpretations of gamma-ray logging measurements performed in vadose zone boreholes (drywells) surrounding the high-level radioactive wastes of the SX tank farm. There are numerous and complex technical issues that must be evaluated before the vertical and radial extent of contaminant migration at the SX tank farm can be accurately assessed. When the Panel first met in early June, 1996, it quickly became apparent that the scientific and technical issues were obscured by policy and institutional affairs which have polarized discussion among various segments of the Hanford organization. This situation reflects the kinds of institutional problems described separately in reports by the National Research Council of the National Academy of Sciences (NAS/NRC), The Hanford Tanks Environmental Impacts and Policy Choices and BmTiers to Science: Technical Management of the Department of Energy Environmental Remediation Program. The Vadose Zone Characterization Program, appears to be caught between conflicting pressures and organizational mandates, some imposed from outside DOE-RL and some self-imposed. The institutional problems they encountered include having both Tank Waste Remediation System (TWRS), the parent organization of the Vadose Zone Characterization Program and Environmental Restoration (ER), each under different regulatory controls and different organizational units, seeking to defend the status quo and discount many of the Panel`s conclusions and recommendations. The results presented in the SX Tank Farm Report, especially the visualizations, have created concern in the public sector, both on a local, personal level and on a national political level.« less
Tanks Focus Area Site Needs Assessment - FY 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.
2001-04-30
The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... isolation in a deep geologic repository for spent fuel or high-level radioactive waste; (2) has had highly... in 10 CFR Part 61, Subpart C and pursuant to a State approved closure plan or State-issued permit; or... with the performance objectives of 10 CFR Part 61, Subpart C; pursuant to a State approved closure plan...
23. Station Compressor Room 1 with Air Compressors and Accumulator ...
23. Station Compressor Room 1 with Air Compressors and Accumulator Tanks, view to the south. One of the two large station air compressor units used for depressing the draft tube water level is visible atop a concrete pedestal on the left side of photograph (the second identical compressor is located in an adjacent room). Two of the six station air accumulator tanks are visible in the background. The smaller station service air compressor is visible in right foreground of the photograph was installed in the early 1980s, and replaced the original station service air compressor. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-22
... Testing at Nuclear Power Plants, Draft Report for Comment'' AGENCY: Nuclear Regulatory Commission. ACTION... Testing at Nuclear Power Plants, Draft Report for Comment,'' and subtitled ``Inservice Testing of Pumps and Valves, and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power...
49 CFR 179.500-14 - Test of tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-14 Test of tanks. (a... internal pressure greater than 90 percent of the marked test pressure. Each tank shall be tested to a pressure at least equal to the marked test pressure of the tank. Pressure shall be maintained for 30...
75 FR 4380 - Draft Test Guidelines; Notice of Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2009-0681; FRL-8437-2] Draft Test Guidelines; Notice...: Notice. SUMMARY: EPA is announcing the availability of four draft test guidelines for Product Performance... holidays. The Docket Facility telephone number is (703) 305-5805. Electronic access to the OPPTS Test...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
...] Draft Guidelines on Biologics Quality Monitoring: Testing for the Detection of Mycoplasma Contamination... Detection of Mycoplasma Contamination.'' This draft guideline identifies stages of manufacture where... contamination. Because the guidelines apply to final product and master seed/cell testing in veterinary vaccines...
Numerical simulation of jet mixing concepts in Tank 241-SY-101
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trent, D.S.; Michener, T.E.
The episodic gas release events (GRES) that have characterized the behavior of Tank 241-SY-101 for the past several years are thought to result from gases generated by the waste material in it that become trapped in the layer of settled solids at the bottom of the tank. Several concepts for mitigating the GREs have been proposed. One concept involves mobilizing the solid particles with mixing jets. The rationale behind this idea is to prevent formation of a consolidated layer of settled solids at the bottom of the tank, thus inhibiting the accumulation of gas bubbles in this layer. Numerical simulationsmore » were conducted using the TEMPEST computer code to assess the viability and effectiveness of the proposed jet discharge concepts and operating parameters. Before these parametric studies were commenced, a series of turbulent jet studies were conducted that established the adequacy of the TEMPEST code for this application. Configurations studied for Tank 241-SY-101 include centrally located downward discharging jets, draft tubes, and horizontal jets that are either stationary or rotating. Parameter studies included varying the jet discharge velocity, jet diameter, discharge elevation, and material properties. A total of 18 simulations were conducted and are reported in this document. The effect of gas bubbles on the mixing dynamics was not included within the scope of this study.« less
NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398
DOE Office of Scientific and Technical Information (OSTI.GOV)
McKenney, Christepher A.; Suber, Gregory F.; Felsher, Harry D.
2013-07-01
Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities inmore » the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but largely NRC's role will change from doing both consultation and monitoring to being focused on monitoring activities within NDAA. DOE has identified other activities at the Hanford Nuclear Reservation that would continue consultation activities but outside of the NDAA in the future. During the past seven years of consultations and monitoring a number of lessons learned about the process, communication issues, and technical guidance have been identified. With the change in focus from reviewing initial performance assessments and draft waste determinations to long-term monitoring (e.g., individual waste tank closure, at F Tank Farm or complete tank farm closure at INTEC expected in the near future), the NRC is going to revise and update its guidance over the next few years to reflect the lessons learned and the change in focus. In addition to the lessons learned, improvements in the guidance will have to account possible rule and guidance changes underway within Part 61. This paper will discuss the initial plans, approaches, and time lines to revise the guidance within NUREG-1854, including opportunities for public involvement. (authors)« less
49 CFR 179.500-14 - Test of tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-14 Test of tanks. (a) After heat-treatment, tanks shall be subjected to hydrostatic tests in a water... subjected previously to internal pressure greater than 90 percent of the marked test pressure. Each tank shall be tested to a pressure at least equal to the marked test pressure of the tank. Pressure shall be...
Robbins, Daniel W
2010-11-01
The objective of this study was to investigate the predictive ability of National Football League (NFL) combine physical test data to predict draft order over the years 2005-2009. The NFL combine provides a setting in which NFL personnel can evaluate top draft prospects. The predictive ability of combine data in its raw form and when normalized in both a ratio and allometric manner was examined for 17 positions. Data from 8 combine physical performance tests were correlated with draft order to determine the direction and strength of relationship between the various combine measures and draft order. Players invited to the combine and subsequently drafted in the same year (n = 1,155) were included in the study. The primary finding was that performance in the combine physical test battery, whether normalized or not, has little association with draft success. In terms of predicting draft order from outcomes of the 8 tests making up the combine battery, normalized data provided no advantage over raw data. Of the 8 performance measures investigated, straight sprint time and jumping ability seem to hold the most weight with NFL personnel responsible for draft decisions. The NFL should consider revising the combine test battery to reflect the physical characteristics it deems important. It may be that NFL teams are more interested in attributes other than the purely physical traits reflected in the combine test battery. Players with aspirations of entering the NFL may be well advised to develop mental and technical skills in addition to developing the physical characteristics necessary to optimize performance.
49 CFR 179.400-18 - Test of inner tank.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Test of inner tank. 179.400-18 Section 179.400-18... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.400-18 Test of inner tank...
14 CFR 23.1015 - Oil tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Oil tank tests. 23.1015 Section 23.1015... tank tests. Each oil tank must be tested under § 23.965, except that— (a) The applied pressure must be five p.s.i. for the tank construction instead of the pressures specified in § 23.965(a); (b) For a tank...
49 CFR 179.220-23 - Test of tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Test of tanks. 179.220-23 Section 179.220-23... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-23 Test of tanks. (a) Each inner container...
Draft-camp predictors of subsequent career success in the Australian Football League.
Burgess, Darren; Naughton, Geraldine; Hopkins, Will
2012-11-01
The National Draft Camp results are generally considered to be important for informing talent scouts about the physical performance capacities of talented young Australian Rules Football (AFL) players. The purpose of this project was to determine magnitude of associations between five year career success in the AFL and physical draft camp tests, final draft selection order and previous match physical performance. Physical testing data of 99 players from the National Under 18 (U 18) competition were retrospectively analysed across 2002 and 2003 National Draft Camps. Physical match data was collected on these players and links with subsequent early career success (AFL games played) were explored. TrakPerformance Software was used to quantify the movement of 92 players during competitive games of the National U 18 Championships. Linear modelling using results from draft camp data involving 95 U 18 players, along with final draft selection order, was used to predict five year career success in senior AFL. Multiple U 18 match variables demonstrated large associations (sprints/min=43% more games, % sprint=43% more games) with five year career success in AFL. Final draft order and single variable predictors had moderate associations with career success. Neither U 18 matches nor draft camp testing was predictive of injuries incurring over the five years. Variability in senior AFL career success had a large association with a combination of match physical variables and draft test results. The objective data available should be considered in the selection of prospective player success. Copyright © 2012 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.
46 CFR 38.25-1 - Tests and inspections-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... last internal inspection if the tank is a pressure vessel type cargo tank on an unmanned barge carrying... conduct nondestructive testing of each tank in accordance with § 38.25-3. (5) If the tank is a pressure... hydrostatic test necessary to determine the condition of the tank, the owner shall perform the test at a...
46 CFR 38.25-1 - Tests and inspections-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... last internal inspection if the tank is a pressure vessel type cargo tank on an unmanned barge carrying... conduct nondestructive testing of each tank in accordance with § 38.25-3. (5) If the tank is a pressure... hydrostatic test necessary to determine the condition of the tank, the owner shall perform the test at a...
46 CFR 38.25-1 - Tests and inspections-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... last internal inspection if the tank is a pressure vessel type cargo tank on an unmanned barge carrying... conduct nondestructive testing of each tank in accordance with § 38.25-3. (5) If the tank is a pressure... hydrostatic test necessary to determine the condition of the tank, the owner shall perform the test at a...
46 CFR 38.25-1 - Tests and inspections-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... last internal inspection if the tank is a pressure vessel type cargo tank on an unmanned barge carrying... conduct nondestructive testing of each tank in accordance with § 38.25-3. (5) If the tank is a pressure... hydrostatic test necessary to determine the condition of the tank, the owner shall perform the test at a...
46 CFR 38.25-1 - Tests and inspections-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... last internal inspection if the tank is a pressure vessel type cargo tank on an unmanned barge carrying... conduct nondestructive testing of each tank in accordance with § 38.25-3. (5) If the tank is a pressure... hydrostatic test necessary to determine the condition of the tank, the owner shall perform the test at a...
Development and Testing of a Novel Green Propellant Piston Tank
NASA Technical Reports Server (NTRS)
Diaz, C. E.; Cavender, D. P.; Higdon, K.; Abrams, J.; Duchek, M. E.; Mader, H.
2017-01-01
Analytical Mechanics Associates (AMA), in cooperation with NASA Marshall Space Flight Center's (MSFC's) Spacecraft Propulsion Systems Branch, developed and tested a novel propellant tank design that employs an internal piston pressurized with an inert gas to expel propellant to thrusters. During the course of this activity, AMA designed, oversaw fabrication, and delivered to MSFC for testing, a piston propellant tank sized for 3U or larger CubeSats. MSFC conducted liquid expulsion testing using ethylene glycol as a referee fluid to map the tank's performance at different pressures and piston positions. Following the expulsion test campaign, the tank is planned to be integrated into a propulsion system test bed for hot fire tests with a 100mN monopropellant thruster to evaluate the tank's influence on thruster performance when operated in a flight like manner. Described in this paper is a comprehensive summary of how the tanks were designed, built, and tested. The fundamental knowledge gained through the fabrication and testing of these tanks gives evidence that the piston tank design may be scalable to meet the requirements and constraints of other small satellites.
Draft Test Guideline: Daphnid Chronic Toxicity Test
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Gammarid Acute Toxicity Test
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Chironomid Sediment Toxicity Test
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Mysid Acute Toxicity Test
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Penaeid Acute Toxicity Test
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Mysid Chronic Toxicity Test
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
DOT National Transportation Integrated Search
1978-08-01
A test plan for the accelerated life testing of thermally shielded tank cars is described. The test program would be conducted at the DOT Transportation Test Center in Pueblo, Colorado. Eighteen tank cars would be included in the program. Five cars w...
Draft Test Guideline: Tadpole/Sediment Subchronic Toxicity Test
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Bivalve Acute Toxicity Test (Embryo Larval)
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Field Testing For Aquatic Organisms
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Oyster Acute Toxicity Test (Shell Deposition)
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Site-Specific Aquatic Microcosm Test, Laboratory
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Generic Freshwater Microcosm Test, Laboratory
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Fish Early-Life Stage Toxicity Test
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
NASA Technical Reports Server (NTRS)
1976-01-01
Full size Tug LO2 and LH2 tank configurations were defined, based on selected tank geometries. These configurations were then locally modeled for computer stress analysis. A large subscale test tank, representing the selected Tug LO2 tank, was designed and analyzed. This tank was fabricated using procedures which represented production operations. An evaluation test program was outlined and a test procedure defined. The necessary test hardware was also fabricated.
49 CFR 179.100-18 - Tests of tanks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-18 Tests of tanks. (a) Each tank...
49 CFR 179.100-18 - Tests of tanks.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-18 Tests of tanks. (a) Each tank...
49 CFR 179.100-18 - Tests of tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-18 Tests of tanks. (a) Each tank...
Introduction to Production/Manufacturing Drafting. Drafting Module 8. Instructor's Guide.
ERIC Educational Resources Information Center
Missouri Univ., Columbia. Instructional Materials Lab.
This module, 1 of 10 in the Drafting curriculum guide developed in Missouri, contains 3 units of study that include some or all of the following components: performance objectives, lesson plans, information sheets, transparency masters, handouts, assignment sheets, job sheets, a unit test, and answers to the unit test. Special instructions on…
Draft Test Guideline: Fish Bioconcentration Factor (BCF)
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Oyster Bioconcentration Factor (BCF)
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Fish Life Cycle Toxicity
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Aquatic Food Chain Transfer
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
An Examination of the Perceived Importance of Technical Competence in Acquisition Project Management
1991-09-01
Develop (First Draft) Instructions Critique (Revision) Answerability Pilot Test (Second Draft) Analysis Response Mode Revision Useability Preparation...appropriate questionnaire items. Initially, the set of questions developed for the study reflected a few shortcomings. A pilot test of the first draft among...resulted. First, feedback from the pilot test indicated a need to reduce the completion time. Because the multiple choice format required several
30 CFR 36.50 - Tests of fuel tank.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Tests of fuel tank. 36.50 Section 36.50 Mineral... MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL-POWERED TRANSPORTATION EQUIPMENT Test Requirements § 36.50 Tests of fuel tank. The fuel tank shall be inspected and tested to determine whether: (a...
30 CFR 36.50 - Tests of fuel tank.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Tests of fuel tank. 36.50 Section 36.50 Mineral... MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL-POWERED TRANSPORTATION EQUIPMENT Test Requirements § 36.50 Tests of fuel tank. The fuel tank shall be inspected and tested to determine whether: (a...
30 CFR 36.50 - Tests of fuel tank.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Tests of fuel tank. 36.50 Section 36.50 Mineral... MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL-POWERED TRANSPORTATION EQUIPMENT Test Requirements § 36.50 Tests of fuel tank. The fuel tank shall be inspected and tested to determine whether: (a...
30 CFR 36.50 - Tests of fuel tank.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Tests of fuel tank. 36.50 Section 36.50 Mineral... MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL-POWERED TRANSPORTATION EQUIPMENT Test Requirements § 36.50 Tests of fuel tank. The fuel tank shall be inspected and tested to determine whether: (a...
30 CFR 36.50 - Tests of fuel tank.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Tests of fuel tank. 36.50 Section 36.50 Mineral... MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL-POWERED TRANSPORTATION EQUIPMENT Test Requirements § 36.50 Tests of fuel tank. The fuel tank shall be inspected and tested to determine whether: (a...
NASA Astrophysics Data System (ADS)
Qiu, Feng; Dai, Guang; Zhang, Ying
According to the acoustic emission information and the appearance inspection information of tank bottom online testing, the external factors associated with tank bottom corrosion status are confirmed. Applying artificial neural network intelligent evaluation method, three tank bottom corrosion status evaluation models based on appearance inspection information, acoustic emission information, and online testing information are established. Comparing with the result of acoustic emission online testing through the evaluation of test sample, the accuracy of the evaluation model based on online testing information is 94 %. The evaluation model can evaluate tank bottom corrosion accurately and realize acoustic emission online testing intelligent evaluation of tank bottom.
Draft Test Guideline: Aquatic Invetebrate Acute Toxicity, Test, Freshwater Daphnids
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Fish Acute Toxicity Test, Freshwater And Marine
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Whole Sediment Acute Toxicity Invertebrates, Freshwater
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Whole Sediment Acute Toxicity Invertebrates, Marine
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
49 CFR 179.100-18 - Tests of tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-18 Tests of tanks... having similar viscosity, at a temperature which shall not exceed 100 °F during the test; and applying...
DOT National Transportation Integrated Search
2010-08-01
This report presents the results of a passenger locomotive fuel tank load test simulating jackknife derailment (JD) load. The test is based on FRA requirements for locomotive fuel tanks in the Title 49, Code of Federal Regulations (CFR), Part 238, Ap...
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can...
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can...
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be...
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can...
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swanson, J.L.
1993-09-01
Disposal of high-level tank wastes at the Hanford Site is currently envisioned to divide the waste between two principal waste forms: glass for the high-level waste (HLW) and grout for the low-level waste (LLW). The draft flow diagram shown in Figure 1.1 was developed as part of the current planning process for the Tank Waste Remediation System (TWRS), which is evaluating options for tank cleanup. The TWRS has been established by the US Department of Energy (DOE) to safely manage the Hanford tank wastes. It includes tank safety and waste disposal issues, as well as the waste pretreatment and wastemore » minimization issues that are involved in the ``clean option`` discussed in this report. This report describes the results of a study led by Pacific Northwest Laboratory to determine if a more aggressive separations scheme could be devised which could mitigate concerns over the quantity of the HLW and the toxicity of the LLW produced by the reference system. This aggressive scheme, which would meet NRC Class A restrictions (10 CFR 61), would fit within the overall concept depicted in Figure 1.1; it would perform additional and/or modified operations in the areas identified as interim storage, pretreatment, and LLW concentration. Additional benefits of this scheme might result from using HLW and LLW disposal forms other than glass and grout, but such departures from the reference case are not included at this time. The evaluation of this aggressive separations scheme addressed institutional issues such as: radioactivity remaining in the Hanford Site LLW grout, volume of HLW glass that must be shipped offsite, and disposition of appropriate waste constituents to nonwaste forms.« less
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. Space Shuttle launch director Michael Leinbach (right) and assistant launch director Doug Lyons support an External Tank (ET) tanking test at Launch Pad 39B from the Launch Control Center. The tanking test is designed to evaluate how the tank, orbiter, solid rocket boosters and ground systems perform under 'cryo-load,' when the tank is filled with the two ultra-low-temperature propellants. The tank filling and draining portion of the test takes about 11 hours. The test also includes a simulated countdown through the hold at T-31 seconds. The test is being conducted to troubleshoot two issues identified by a tanking test held on April 14. Data is being collected to analyze the liquid hydrogen sensors that gave intermittent readings and the liquid hydrogen pressurization relief valve that cycled more times than standard. The tanking tests are part of preparations for Space Shuttle Discovery's Return to Flight mission, STS-114, to the International Space Station. The launch window extends from July 13 through July 31.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. Bill Parsons (foreground), manager of the Space Shuttle Program, supports an External Tank (ET) tanking test at Launch Pad 39B from the Launch Control Center. The tanking test is designed to evaluate how the tank, orbiter, solid rocket boosters and ground systems perform under 'cryo-load,' when the tank is filled with the two ultra-low-temperature propellants. The tank filling and draining portion of the test takes about 11 hours. The test also includes a simulated countdown through the hold at T-31 seconds. The test is being conducted to troubleshoot two issues identified by a tanking test held on April 14. Data is being collected to analyze the liquid hydrogen sensors that gave intermittent readings and the liquid hydrogen pressurization relief valve that cycled more times than standard. The tanking tests are part of preparations for Space Shuttle Discovery's Return to Flight mission, STS-114, to the International Space Station. The launch window extends from July 13 through July 31.
Mars Sample Handling Protocol Workshop Series: Workshop 4
NASA Technical Reports Server (NTRS)
Race Margaret S. (Editor); DeVincenzi, Donald L. (Editor); Rummel, John D. (Editor); Acevedo, Sara E. (Editor)
2001-01-01
In preparation for missions to Mars that will involve the return of samples to Earth, it will be necessary to prepare for the receiving, handling, testing, distributing, and archiving of martian materials here on Earth. Previous groups and committees have studied selected aspects of sample return activities, but specific detailed protocols for the handling and testing of returned samples must still be developed. To further refine the requirements for sample hazard testing and to develop the criteria for subsequent release of sample materials from quarantine, the NASA Planetary Protection Officer convened a series of workshops in 2000-2001. The overall objective of the Workshop Series was to produce a Draft Protocol by which returned martian sample materials can be assessed for biological hazards and examined for evidence of life (extant or extinct) while safeguarding the purity of the samples from possible terrestrial contamination. This report also provides a record of the proceedings of Workshop 4, the final Workshop of the Series, which was held in Arlington, Virginia, June 5-7, 2001. During Workshop 4, the sub-groups were provided with a draft of the protocol compiled in May 2001 from the work done at prior Workshops in the Series. Then eight sub-groups were formed to discuss the following assigned topics: Review and Assess the Draft Protocol for Physical/Chemical Testing Review and Assess the Draft Protocol for Life Detection Testing Review and Assess the Draft Protocol for Biohazard Testing Environmental and Health/Monitoring and Safety Issues Requirements of the Draft Protocol for Facilities and Equipment Contingency Planning for Different Outcomes of the Draft Protocol Personnel Management Considerations in Implementation of the Draft Protocol Draft Protocol Implementation Process and Update Concepts This report provides the first complete presentation of the Draft Protocol for Mars Sample Handling to meet planetary protection needs. This Draft Protocol, which was compiled from deliberations and recommendations from earlier Workshops in the Series, represents a consensus that emerged from the discussions of all the sub-groups assembled over the course of the five Workshops of the Series. These discussions converged on a conceptual approach to sample handling, as well as on specific analytical requirements. Discussions also identified important issues requiring attention, as well as research and development needed for protocol implementation.
NASA Technical Reports Server (NTRS)
Moran, Matthew E.; Nyland, Ted W.
1992-01-01
A total of 38 hydrogen no-vent fill tests were performed in this test series using various size spray nozzles and a spray bar with different hole sizes in a 5 cubic foot receiver tank. Fill levels of 90 percent by volume or greater were achieved in 26 of the tests while maintaining a receiver tank pressure below 30 psia. Spray nozzles were mounted at the top of the tank, whereas, the spray bar was centered in the tank axially. The spray nozzle no-vent fills demonstrated tank pressure and temperature responses comparable to previous test series. Receiver tank pressure responses for the spray bar configuration were similar to the spray nozzle tests with the pressure initially rising rapidly, then leveling off as vapor condenses onto the discharging liquid streams, and finally ramping up near the end of the test due to ullage compression. Both liquid injection techniques tested were capable of filling the receiver tank to 90 percent under variable test conditions. Comparisons between the spray nozzle and spray bar configurations for well matched test conditions indicate the spray nozzle injection technique is more effective in minimizing the receiving tank pressure throughout a no-vent fill compared to the spray bar under normal gravity conditions.
49 CFR 179.220-23 - Test of tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-23 Test of tanks. (a) Each.... The temperature of the pressurizing medium must not exceed 100 °F. during the test. The container must...
49 CFR 179.200-22 - Test of tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-22 Test of tanks. (a) Each... having similar viscosity, of a temperature which shall not exceed 100 °F. during the test; and applying...
VOLUMETRIC TANK TESTING: AN OVERVIEW
This report summarizes the technical findings of an EPA study on volumetric tank testing. The results of this study, which evaluated the viability of volumetric tank tests as a means of detecting leaks in underground storage tanks, are described. Also, the accuracy requirements s...
Draft Test Guideline: Fish Acute Toxicity Mitigated By Humic Acid
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
Draft Test Guideline: Special Considerations for Conducting Aquatic Laboratory Studies
The following draft test guideline is part of a series of test guidelines that have been developed by EPA for use in the testing of pesticides and toxic substances, and the development of test data for submission to the Agency for review.
14 CFR 23.1015 - Oil tank tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Oil tank tests. 23.1015 Section 23.1015... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Oil System § 23.1015 Oil tank tests. Each oil tank must be tested under § 23.965, except that— (a) The applied pressure must be...
14 CFR 23.1015 - Oil tank tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oil tank tests. 23.1015 Section 23.1015... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Oil System § 23.1015 Oil tank tests. Each oil tank must be tested under § 23.965, except that— (a) The applied pressure must be...
14 CFR 23.1015 - Oil tank tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Oil tank tests. 23.1015 Section 23.1015... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Oil System § 23.1015 Oil tank tests. Each oil tank must be tested under § 23.965, except that— (a) The applied pressure must be...
RP1 (KEROSENE) STORAGE TANKS ON HILLSIDE EAST OF TEST STAND ...
RP1 (KEROSENE) STORAGE TANKS ON HILLSIDE EAST OF TEST STAND 1-B. THIS TANK FARM SERVES BOTH TEST STANDS 1-A AND 1-B - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Combined Fuel Storage Tank Farm, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
14 CFR 23.1015 - Oil tank tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Oil tank tests. 23.1015 Section 23.1015... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Oil System § 23.1015 Oil tank tests. Each oil tank must be tested under § 23.965, except that— (a) The applied pressure must be...
76 FR 57031 - Draft Harmonized Test Guidelines; Notice of Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
...EPA is announcing the availability of the draft test guidelines for Series 810--Product Performance Test Guidelines for Public Health Uses of Antimicrobial Agents, concerning specifically air, textiles, and water.
Solomon, Gary S; Kuhn, Andrew
2014-04-01
There are limited empirical data available regarding the relationship between concussion history and neurocognitive functioning in active National Football League (NFL) players in general and NFL draft picks in particular. Potential NFL draft picks undergo 2 neurocognitive tests at the National Invitational Camp (Scouting Combine) every year: the Wonderlic and, since 2011, the Immediate Post-concussion Assessment and Cognitive Testing (ImPACT). After conclusion of the combine and before the draft, NFL teams invite potential draft picks to their headquarters for individual visits where further assessment may occur. To examine the relationship between concussion history and neurocognitive performance (ImPACT and Wonderlic) in a sample of elite NFL draft picks. Cohort study; Level of evidence, 3. Over 7 years, 226 potential draft picks were invited to visit a specific NFL team's headquarters after the combine. The athletes were divided into 3 groups based on self-reported concussion history: no prior concussions, 1 prior concussion, and 2 or more prior concussions. Neurocognitive measures of interest included Wonderlic scores (provided by the NFL team) and ImPACT composite scores (administered either at the combine or during a visit to the team headquarters). The relationship between concussion history and neurocognitive scores was assessed, as were the relationships among the 2 neurocognitive tests. Concussion history had no relationship to neurocognitive performance on either the Wonderlic or ImPACT. Concussion history did not affect performance on either neurocognitive test, suggesting that for this cohort, a history of concussion may not have adverse effects on neurocognitive functioning as measured by these 2 tests. This study reveals no correlation between concussion history and neurocognitive test scores (ImPACT, Wonderlic) in soon-to-be active NFL athletes.
Studies on the exercise physiology of draft horses performed in Japan during the 1950s and 1960s.
Hiraga, Atsushi; Sugano, Shigeru
2017-01-01
Although the total number of horses raised in Japan dramatically decreased after World War II, because draft horses were still used for farm work in paddy fields and on farms during the period of the 1950s and 1960s, a performance test for selecting better draft horses was needed. In order to determine the most suitable size of draft horses for Japanese farm conditions, the working power of horses weighing from 185 to 622 kg was evaluated by performing an endurance test, several kinds of working power tests, and maximum pulling power tests. Oxygen consumption during draft exercise was measured by the Douglas bag method in order to evaluate effects of draft workload under the conditions of different types of work (14- and 18-cm plow depths, cultivator, and tillage), traction methods (shoulder traction, shoulder-trunk traction, and chest-trunk traction), walking speeds (40, 60, 80, 100, and 120 m/min), and depths of water (0, 18, 36, and 54 cm) on energy expenditure. The relationship between energy consumption and pulse rate during exercise was also evaluated. A study of a performance test for draft horses was conducted to establish a new approach for evaluating draft horse performance using heart rate as an index. For this study, a beat meter for measuring heart rate was developed, and experimental protocols were used to evaluate the relationship between heart rate and workload. Although the research results obtained from these studies do not have particular relevance in the current day, these studies are valuable for understanding the history of equine exercise physiology in Japan.
Studies on the exercise physiology of draft horses performed in Japan during the 1950s and 1960s
HIRAGA, Atsushi; SUGANO, Shigeru
2017-01-01
ABSTRACT Although the total number of horses raised in Japan dramatically decreased after World War II, because draft horses were still used for farm work in paddy fields and on farms during the period of the 1950s and 1960s, a performance test for selecting better draft horses was needed. In order to determine the most suitable size of draft horses for Japanese farm conditions, the working power of horses weighing from 185 to 622 kg was evaluated by performing an endurance test, several kinds of working power tests, and maximum pulling power tests. Oxygen consumption during draft exercise was measured by the Douglas bag method in order to evaluate effects of draft workload under the conditions of different types of work (14- and 18-cm plow depths, cultivator, and tillage), traction methods (shoulder traction, shoulder-trunk traction, and chest-trunk traction), walking speeds (40, 60, 80, 100, and 120 m/min), and depths of water (0, 18, 36, and 54 cm) on energy expenditure. The relationship between energy consumption and pulse rate during exercise was also evaluated. A study of a performance test for draft horses was conducted to establish a new approach for evaluating draft horse performance using heart rate as an index. For this study, a beat meter for measuring heart rate was developed, and experimental protocols were used to evaluate the relationship between heart rate and workload. Although the research results obtained from these studies do not have particular relevance in the current day, these studies are valuable for understanding the history of equine exercise physiology in Japan. PMID:28400701
49 CFR 179.400-21 - Test of pressure relief valves.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Test of pressure relief valves. 179.400-21 Section... FOR TANK CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.400-21 Test of pressure relief valves. Each valve must be tested with air or gas...
14 CFR 29.965 - Fuel tank tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel tank tests. 29.965 Section 29.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.965 Fuel tank tests. (a) Each fuel tank...
14 CFR 27.965 - Fuel tank tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel tank tests. 27.965 Section 27.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.965 Fuel tank tests. (a) Each fuel tank...
14 CFR 29.965 - Fuel tank tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel tank tests. 29.965 Section 29.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.965 Fuel tank tests. (a) Each fuel tank...
14 CFR 27.965 - Fuel tank tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel tank tests. 27.965 Section 27.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.965 Fuel tank tests. (a) Each fuel tank...
14 CFR 29.965 - Fuel tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel tank tests. 29.965 Section 29.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.965 Fuel tank tests. (a) Each fuel tank...
14 CFR 27.965 - Fuel tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel tank tests. 27.965 Section 27.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.965 Fuel tank tests. (a) Each fuel tank...
14 CFR 29.1015 - Oil tank tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Oil tank tests. 29.1015 Section 29.1015 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Oil System § 29.1015 Oil tank tests. Each oil tank must...
14 CFR 29.1015 - Oil tank tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oil tank tests. 29.1015 Section 29.1015 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Oil System § 29.1015 Oil tank tests. Each oil tank must...
14 CFR 29.1015 - Oil tank tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Oil tank tests. 29.1015 Section 29.1015 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Oil System § 29.1015 Oil tank tests. Each oil tank must...
14 CFR 29.1015 - Oil tank tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Oil tank tests. 29.1015 Section 29.1015 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Oil System § 29.1015 Oil tank tests. Each oil tank must...
NASA Technical Reports Server (NTRS)
Flachbart, Robin; Hedayat, Ali; Holt, Kimberly A.; Cruit, Wendy (Technical Monitor)
2001-01-01
The Advanced Shuttle Upper Stage (ASUS) concept addresses safety concerns associated .with cryogenic stages by launching empty, and filling on ascent. The ASUS employs a rapid chill and fill concept. A spray bar is used to completely chill the tank before fill, allowing the vent valve to be closed during the fill process. The first tests of this concept, using a flight size (not flight weight) tank. were conducted at Marshall Space Flight Center (MSFC) during the summer of 2000. The objectives of the testing were to: 1) demonstrate that a flight size tank could be filled in roughly 5 minutes to accommodate the shuttle ascent window, and 2) demonstrate a no-vent fill of the tank. A total of 12 tests were conducted. Models of the test facility fill and vent systems, as well as the tank, were constructed. The objective of achieving tank fill in 5 minutes was met during the test series. However, liquid began to accumulate in the tank before it was chilled. Since the tank was not chilled until the end of each test, vent valve closure during fill was not possible. Even though the chill and fill process did not occur as expected, reasonable model correlation with the test data was achieved.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. Members of the Final Inspection Team check their radios and Emergency Life Support Apparatus (ELSA) equipment before moving to Launch Pad 39B to support an External Tank (ET) tanking test. This team conducts a preflight walkdown of the vehicle and pad during the hold at T-3 hours on launch day. The tanking test is designed to evaluate how the tank, orbiter, solid rocket boosters and ground systems perform under 'cryo-load,' when the tank is filled with the two ultra-low- temperature propellants. The tank filling and draining portion of the test takes about 11 hours. The test also includes a simulated countdown through the hold at T-31 seconds. The test is being conducted to troubleshoot two issues identified by a tanking test held on April 14. Data is being collected to analyze the liquid hydrogen sensors that gave intermittent readings and the liquid hydrogen pressurization relief valve that cycled more times than standard. The tanking tests are part of preparations for Space Shuttle Discovery's Return to Flight mission, STS-114, to the International Space Station. The launch window extends from July 13 through July 31.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. Members of the Final Inspection Team check their radios and Emergency Life Support Apparatus (ELSA) equipment before moving to Launch Pad 39B to support an External Tank (ET) tanking test. This team conducts a preflight walkdown of the vehicle and pad during the hold at T-3 hours on launch day. The tanking test is designed to evaluate how the tank, orbiter, solid rocket boosters and ground systems perform under 'cryo-load,' when the tank is filled with the two ultra-low- temperature propellants. The tank filling and draining portion of the test takes about 11 hours. The test also includes a simulated countdown through the hold at T-31 seconds. The test is being conducted to troubleshoot two issues identified by a tanking test held on April 14. Data is being collected to analyze the liquid hydrogen sensors that gave intermittent readings and the liquid hydrogen pressurization relief valve that cycled more times than standard. The tanking tests are part of preparations for Space Shuttle Discovery's Return to Flight mission, STS-114, to the International Space Station. The launch window extends from July 13 through July 31.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. Members of the Final Inspection Team return from Launch Pad 39B where they supported an External Tank (ET) tanking test. This team conducts a preflight walkdown of the vehicle and pad during the hold at T-3 hours on launch day. The tanking test is designed to evaluate how the tank, orbiter, solid rocket boosters and ground systems perform under 'cryo-load,' when the tank is filled with the two ultra-low-temperature propellants. The tank filling and draining portion of the test takes about 11 hours. The test also includes a simulated countdown through the hold at T-31 seconds. The test is being conducted to troubleshoot two issues identified by a tanking test held on April 14. Data is being collected to analyze the liquid hydrogen sensors that gave intermittent readings and the liquid hydrogen pressurization relief valve that cycled more times than standard. The tanking tests are part of preparations for Space Shuttle Discovery's Return to Flight mission, STS-114, to the International Space Station. The launch window extends from July 13 through July 31.
49 CFR 179.220-23 - Test of tanks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-23 Test of tanks. (a) Each inner container...
Analysis of accelerations measured during full-scale tank car impact tests
DOT National Transportation Integrated Search
2007-04-01
Tank car impact responses were investigated using accelerometers mounted at various locations on a tank car. Several tests were run with both a full and an empty tank car, and varying the tank car impact speed. The data from the accelerometers went t...
14 CFR 25.1015 - Oil tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Oil tank tests. 25.1015 Section 25.1015... STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Oil System § 25.1015 Oil tank tests. Each oil tank must be designed and installed so that— (a) It can withstand, without failure, each vibration, inertia...
49 CFR 180.509 - Requirements for inspection and test of specification tank cars.
Code of Federal Regulations, 2010 CFR
2010-10-01
... specification tank cars. 180.509 Section 180.509 Transportation Other Regulations Relating to Transportation... REGULATIONS CONTINUING QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.509 Requirements for inspection and test of specification tank cars. (a) General. (1) Each tank...
49 CFR 180.509 - Requirements for inspection and test of specification tank cars.
Code of Federal Regulations, 2011 CFR
2011-10-01
... specification tank cars. 180.509 Section 180.509 Transportation Other Regulations Relating to Transportation...) CONTINUING QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.509 Requirements for inspection and test of specification tank cars. (a) General. (1) Each tank car facility shall...
14 CFR 25.1015 - Oil tank tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oil tank tests. 25.1015 Section 25.1015... STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Oil System § 25.1015 Oil tank tests. Each oil tank must... in § 25.965(a); and (2) The test fluid must be oil at 250 °F. instead of the fluid specified in § 25...
14 CFR 25.1015 - Oil tank tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Oil tank tests. 25.1015 Section 25.1015... STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Oil System § 25.1015 Oil tank tests. Each oil tank must... in § 25.965(a); and (2) The test fluid must be oil at 250 °F. instead of the fluid specified in § 25...
40 CFR 1051.515 - How do I test my fuel tank for permeation emissions?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false How do I test my fuel tank for... Procedures § 1051.515 How do I test my fuel tank for permeation emissions? Measure permeation emissions by... make sure not to overestimate the surface area. (3) Fill the fuel tank with the test fuel specified in...
40 CFR 1051.515 - How do I test my fuel tank for permeation emissions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false How do I test my fuel tank for... Procedures § 1051.515 How do I test my fuel tank for permeation emissions? Measure permeation emissions by... make sure not to overestimate the surface area. (3) Fill the fuel tank with the test fuel specified in...
40 CFR 1051.515 - How do I test my fuel tank for permeation emissions?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false How do I test my fuel tank for... Procedures § 1051.515 How do I test my fuel tank for permeation emissions? Measure permeation emissions by... make sure not to overestimate the surface area. (3) Fill the fuel tank with the test fuel specified in...
40 CFR 1051.515 - How do I test my fuel tank for permeation emissions?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false How do I test my fuel tank for... Procedures § 1051.515 How do I test my fuel tank for permeation emissions? Measure permeation emissions by... make sure not to overestimate the surface area. (3) Fill the fuel tank with the test fuel specified in...
40 CFR 1051.515 - How do I test my fuel tank for permeation emissions?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false How do I test my fuel tank for... Procedures § 1051.515 How do I test my fuel tank for permeation emissions? Measure permeation emissions by... make sure not to overestimate the surface area. (3) Fill the fuel tank with the test fuel specified in...
14 CFR 25.1015 - Oil tank tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Oil tank tests. 25.1015 Section 25.1015... STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Oil System § 25.1015 Oil tank tests. Each oil tank must... in § 25.965(a); and (2) The test fluid must be oil at 250 °F. instead of the fluid specified in § 25...
14 CFR 25.1015 - Oil tank tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Oil tank tests. 25.1015 Section 25.1015... STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Oil System § 25.1015 Oil tank tests. Each oil tank must... in § 25.965(a); and (2) The test fluid must be oil at 250 °F. instead of the fluid specified in § 25...
Development tests of LOX/LH 2 tank for H-I launch vehicle
NASA Astrophysics Data System (ADS)
Takamatsu, H.; Imagawa, K.; Ichimaru, Y.
H-I is a future launch vehicle of Japan with a capability of placing more than 550 kg payload into a geostationary orbit. The National Space Development Agency of Japan (NASDA) is now directing its efforts to the final development of H-I launch vehicle. H-I's high launch capability is attained by adopting a newly developed second stage with a LOX/LH 2 propulsion system. The second stage propulsion system consists of a tank and an engine. The tank is 2.5 m in diameter and 5.7 m in length and contains 8.7 tons of propellants. This tank is an integral tank with a common bulkhead which separates the tank into forward LH 2 tank and aft LOX tank. The tank is made of 2219 aluminum alloy and is insulated with sprayed polyurethane foam. The common bulkhead is made of FRP honeycomb core and aluminium alloy surface sheets. The most critical item in the development of the tank is the common bulkhead, therefore the cryogenic structural test was carried out to verify the structural integrity of the bulkhead. The structural integrity of the whole LOX/LH 2 tank was verified by the cryogenic structural test of a sub-scale tank and the room temperature structural test of a prototype tank.
Glass Bubbles Insulation for Liquid Hydrogen Storage Tanks
NASA Technical Reports Server (NTRS)
Sass, J. P.; SaintCyr, W. W.; Barrett, T. M.; Baumgartner, R. G.; Lott, J. W.; Fesmire, J. E.
2009-01-01
A full-scale field application of glass bubbles insulation has been demonstrated in a 218,000 L liquid hydrogen storage tank. This work is the evolution of extensive materials testing, laboratory scale testing, and system studies leading to the use of glass bubbles insulation as a cost efficient and high performance alternative in cryogenic storage tanks of any size. The tank utilized is part of a rocket propulsion test complex at the NASA Stennis Space Center and is a 1960's vintage spherical double wall tank with an evacuated annulus. The original perlite that was removed from the annulus was in pristine condition and showed no signs of deterioration or compaction. Test results show a significant reduction in liquid hydrogen boiloff when compared to recent baseline data prior to removal of the perlite insulation. The data also validates the previous laboratory scale testing (1000 L) and full-scale numerical modeling (3,200,000 L) of boiloff in spherical cryogenic storage tanks. The performance of the tank will continue to be monitored during operation of the tank over the coming years. KEYWORDS: Glass bubble, perlite, insulation, liquid hydrogen, storage tank.
40 CFR 86.532-78 - Vehicle preconditioning.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 1978 and Later New Motorcycles; Test Procedures § 86.532-78 Vehicle preconditioning. (a) The vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be drained through the provided fuel tank(s) drain(s) and charged with the specified test fuel, § 86.513, to...
40 CFR 86.532-78 - Vehicle preconditioning.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 1978 and Later New Motorcycles; Test Procedures § 86.532-78 Vehicle preconditioning. (a) The vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be drained through the provided fuel tank(s) drain(s) and charged with the specified test fuel, § 86.513, to...
40 CFR 86.532-78 - Vehicle preconditioning.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 1978 and Later New Motorcycles; Test Procedures § 86.532-78 Vehicle preconditioning. (a) The vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be drained through the provided fuel tank(s) drain(s) and charged with the specified test fuel, § 86.513, to...
40 CFR 86.532-78 - Vehicle preconditioning.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 1978 and Later New Motorcycles; Test Procedures § 86.532-78 Vehicle preconditioning. (a) The vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be drained through the provided fuel tank(s) drain(s) and charged with the specified test fuel, § 86.513, to...
40 CFR 86.532-78 - Vehicle preconditioning.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 1978 and Later New Motorcycles; Test Procedures § 86.532-78 Vehicle preconditioning. (a) The vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be drained through the provided fuel tank(s) drain(s) and charged with the specified test fuel, § 86.513, to...
14 CFR 29.1015 - Oil tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Oil tank tests. 29.1015 Section 29.1015... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Oil System § 29.1015 Oil tank tests. Each oil tank must be designed and installed so that— (a) It can withstand, without failure, any vibration, inertia, and...
49 CFR 179.500-16 - Tests of pressure relief devices.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Tests of pressure relief devices. 179.500-16... FOR TANK CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be...
49 CFR 179.300-16 - Tests of tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) [Reserved] (b) After all fittings have been installed, each tank shall be subjected to interior air pressure... methods. No tank shall have been subjected previously to internal pressure within 100 pounds of the test pressure. Each tank shall be tested to the pressure prescribed in § 179.301. Pressure shall be maintained...
49 CFR 179.300-16 - Tests of tanks.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) [Reserved] (b) After all fittings have been installed, each tank shall be subjected to interior air pressure... methods. No tank shall have been subjected previously to internal pressure within 100 pounds of the test pressure. Each tank shall be tested to the pressure prescribed in § 179.301. Pressure shall be maintained...
49 CFR 179.300-16 - Tests of tanks.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) [Reserved] (b) After all fittings have been installed, each tank shall be subjected to interior air pressure... methods. No tank shall have been subjected previously to internal pressure within 100 pounds of the test pressure. Each tank shall be tested to the pressure prescribed in § 179.301. Pressure shall be maintained...
49 CFR 179.300-16 - Tests of tanks.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) [Reserved] (b) After all fittings have been installed, each tank shall be subjected to interior air pressure... methods. No tank shall have been subjected previously to internal pressure within 100 pounds of the test pressure. Each tank shall be tested to the pressure prescribed in § 179.301. Pressure shall be maintained...
Machine Shop. Criterion-Referenced Test (CRT) Item Bank.
ERIC Educational Resources Information Center
Davis, Diane, Ed.
This drafting criterion-referenced test item bank is keyed to the machine shop competency profile developed by industry and education professionals in Missouri. The 16 references used for drafting the test items are listed. Test items are arranged under these categories: orientation to machine shop; performing mathematical calculations; performing…
Blunt Impact Tests of Retired Passenger Locomotive Fuel Tanks
DOT National Transportation Integrated Search
2017-08-01
The Transportation Technology Center, Inc. conducted impact tests on three locomotive fuel tanks as part of the Federal Railroad Administrations locomotive fuel tank crashworthiness improvement program. Three fuel tanks, two from EMD F40PH locomot...
Blunt impact tests of retired passenger locomotive fuel tanks
DOT National Transportation Integrated Search
2017-08-01
The Transportation Technology Center, Inc. conducted impact tests on three locomotive fuel tanks as part of the Federal Railroad Administrations locomotive fuel tank crashworthiness improvement program. Three fuel tanks, two from EMD F40PH locomot...
Thermal Structures Technology Development for Reusable Launch Vehicle Cryogenic Propellant Tanks
NASA Technical Reports Server (NTRS)
Johnson, Theodore F.; Natividad, Roderick; Rivers, H. Kevin; Smith, Russell
1998-01-01
Analytical and experimental studies conducted at the NASA Langley Research Center for investigating integrated cryogenic propellant tank systems for a Reusable Launch Vehicle are described. The cryogenic tanks are investigated as an integrated tank system. An integrated tank system includes the tank wall, cryogenic insulation, Thermal Protection System (TPS) attachment sub-structure, and TPS. Analysis codes are used to size the thicknesses of cryogenic insulation and TPS insulation for thermal loads, and to predict tank buckling strengths at various ring frame spacings. The unique test facilities developed for the testing of cryogenic tank components are described. Testing at cryogenic and high-temperatures verifies the integrity of materials, design concepts, manufacturing processes, and thermal/structural analyses. Test specimens ranging from the element level to the subcomponent level are subjected to projected vehicle operational mechanical loads and temperatures. The analytical and experimental studies described in this paper provide a portion of the basic information required for the development of light-weight reusable cryogenic propellant tanks.
Thermal Structures Technology Development for Reusable Launch Vehicle Cryogenic Propellant Tanks
NASA Technical Reports Server (NTRS)
Johnson, Theodore F.; Natividad, Roderick; Rivers, H. Kevin; Smith, Russell W.
2005-01-01
Analytical and experimental studies conducted at the NASA, Langley Research Center (LaRC) for investigating integrated cryogenic propellant tank systems for a reusable launch vehicle (RLV) are described. The cryogenic tanks are investigated as an integrated tank system. An integrated tank system includes the tank wall, cryogenic insulation, thermal protection system (TPS) attachment sub-structure, and TPS. Analysis codes are used to size the thicknesses of cryogenic insulation and TPS insulation for thermal loads, and to predict tank buckling strengths at various ring frame spacings. The unique test facilities developed for the testing of cryogenic tank components are described. Testing at cryogenic and high-temperatures verifies the integrity of materials, design concepts, manufacturing processes, and thermal/structural analyses. Test specimens ranging from the element level to the subcomponent level are subjected to projected vehicle operational mechanical loads and temperatures. The analytical and experimental studies described in this paper provide a portion of the basic information required for the development of light-weight reusable cryogenic propellant tanks.
76 FR 32878 - Draft Regulatory Guide: Issuance, Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-07
...-0129] Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-1253, ``Preoperational Testing of Emergency Core Cooling Systems for Pressurized-Water Reactors''. FOR FURTHER INFORMATION CONTACT: Mekonen M...
NASA Technical Reports Server (NTRS)
Taylor, William J.; Chato, David J.
1993-01-01
The NASA Lewis Research Center (NASA/LeRC) have been investigating a no-vent fill method for refilling cryogenic storage tanks in low gravity. Analytical modeling based on analyzing the heat transfer of a droplet has successfully represented the process in 0.034 m and 0.142 cubic m commercial dewars using liquid nitrogen and hydrogen. Recently a large tank (4.96 cubic m) was tested with hydrogen. This lightweight tank is representative of spacecraft construction. This paper presents efforts to model the large tank test data. The droplet heat transfer model is found to over predict the tank pressure level when compared to the large tank data. A new model based on equilibrium thermodynamics has been formulated. This new model is compared to the published large scale tank's test results as well as some additional test runs with the same equipment. The results are shown to match the test results within the measurement uncertainty of the test data except for the initial transient wall cooldown where it is conservative (i.e., overpredicts the initial pressure spike found in this time frame).
Analysis of the Kaplan turbine draft tube effect
NASA Astrophysics Data System (ADS)
Motycak, L.; Skotak, A.; Obrovsky, J.
2010-08-01
The aim of this paper is to present information about possible problems and errors which can appear during numerical analyses of low head Kaplan turbines with a view to the runner - draft tube interaction. The setting of numerical model, grid size, used boundary conditions are the interface definition between runner and draft tube are discussed. There are available data from physical model tests which gives a great opportunity to compare CFD and experiment results and on the basis of this comparison to determine the approach to the CFD flow modeling. The main purpose for the Kaplan turbine model measurement was to gather the information about real flow field. The model tests were carried out in new hydraulic laboratory of CKD Blansko Engineering. The model tests were focused on the detailed velocity measurements downstream of the runner by differential pressure probe and on the velocity measurement downstream of the draft tube elbow by Particle Image Velocimetry method (PIV). The data from CFD simulation were compared to the velocity measurement results. In the paper also the design of the original draft tube modification due to flow improvement is discussed in the case of the Kaplan turbine uprating project. The results of the draft tube modification were confirmed by model tests in the hydraulic laboratory as well.
Feasibility of potable water generators to meet vessel numeric ballast water discharge limits.
Albert, Ryan J; Viveiros, Edward; Falatko, Debra S; Tamburri, Mario N
2017-07-15
Ballast water is taken on-board vessels into ballast water tanks to maintain vessel draft, buoyancy, and stability. Unmanaged ballast water contains aquatic organisms that, when transported and discharged to non-native waters, may establish as invasive species. Technologies capable of achieving regulatory limits designed to decrease the likelihood of invasion include onboard ballast water management systems. However, to date, the treatment development and manufacturing marketplace is limited to large vessels with substantial ballast requirements. For smaller vessels or vessels with reduced ballast requirements, we evaluated the feasibility of meeting the discharge limits by generating ballast water using onboard potable water generators. Case studies and parametric analyses demonstrated the architectural feasibility of installing potable water generators onboard actual vessels with minimal impacts for most vessel types evaluated. Furthermore, land-based testing of a potable water generator demonstrated capability to meet current numeric discharge limits for living organisms in all size classes. Published by Elsevier Ltd.
NASA Astrophysics Data System (ADS)
Sass, J. P.; Fesmire, J. E.; Nagy, Z. F.; Sojourner, S. J.; Morris, D. L.; Augustynowicz, S. D.
2008-03-01
A technology demonstration test project was conducted by the Cryogenics Test Laboratory at the Kennedy Space Center (KSC) to provide comparative thermal performance data for glass microspheres, referred to as bubbles, and perlite insulation for liquid hydrogen tank applications. Two identical 1/15th scale versions of the 3,200,000 liter spherical liquid hydrogen tanks at Launch Complex 39 at KSC were custom designed and built to serve as test articles for this test project. Evaporative (boil-off) calorimeter test protocols, including liquid nitrogen and liquid hydrogen, were established to provide tank test conditions characteristic of the large storage tanks that support the Space Shuttle launch operations. This paper provides comparative thermal performance test results for bubbles and perlite for a wide range of conditions. Thermal performance as a function of cryogenic commodity (nitrogen and hydrogen), vacuum pressure, insulation fill level, tank liquid level, and thermal cycles will be presented.
46 CFR 97.15-5 - Drafts and load line markings.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Drafts and load line markings. 97.15-5 Section 97.15-5... OPERATIONS Tests, Drills, and Inspections § 97.15-5 Drafts and load line markings. (a) The master of every vessel on an ocean, coastwise, or Great Lakes voyage shall enter the drafts of the vessel, forward and...
46 CFR 97.15-5 - Drafts and load line markings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Drafts and load line markings. 97.15-5 Section 97.15-5... OPERATIONS Tests, Drills, and Inspections § 97.15-5 Drafts and load line markings. (a) The master of every vessel on an ocean, coastwise, or Great Lakes voyage shall enter the drafts of the vessel, forward and...
46 CFR 97.15-5 - Drafts and load line markings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Drafts and load line markings. 97.15-5 Section 97.15-5... OPERATIONS Tests, Drills, and Inspections § 97.15-5 Drafts and load line markings. (a) The master of every vessel on an ocean, coastwise, or Great Lakes voyage shall enter the drafts of the vessel, forward and...
46 CFR 97.15-5 - Drafts and load line markings.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Drafts and load line markings. 97.15-5 Section 97.15-5... OPERATIONS Tests, Drills, and Inspections § 97.15-5 Drafts and load line markings. (a) The master of every vessel on an ocean, coastwise, or Great Lakes voyage shall enter the drafts of the vessel, forward and...
46 CFR 97.15-5 - Drafts and load line markings.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Drafts and load line markings. 97.15-5 Section 97.15-5... OPERATIONS Tests, Drills, and Inspections § 97.15-5 Drafts and load line markings. (a) The master of every vessel on an ocean, coastwise, or Great Lakes voyage shall enter the drafts of the vessel, forward and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Containers for Motor Vehicle Transportation § 178.337-16 Testing. (a) Inspection and tests. Inspection of materials of construction of the cargo tank and its appurtenances and original test and inspection of the... least twice the cargo tank design pressure. (b) Weld testing and inspection. (1) Each cargo tank...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Containers for Motor Vehicle Transportation § 178.337-16 Testing. (a) Inspection and tests. Inspection of materials of construction of the cargo tank and its appurtenances and original test and inspection of the... least twice the cargo tank design pressure. (b) Weld testing and inspection. (1) Each cargo tank...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Containers for Motor Vehicle Transportation § 178.337-16 Testing. (a) Inspection and tests. Inspection of materials of construction of the cargo tank and its appurtenances and original test and inspection of the... least twice the cargo tank design pressure. (b) Weld testing and inspection. (1) Each cargo tank...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Containers for Motor Vehicle Transportation § 178.337-16 Testing. (a) Inspection and tests. Inspection of materials of construction of the cargo tank and its appurtenances and original test and inspection of the... least twice the cargo tank design pressure. (b) Weld testing and inspection. (1) Each cargo tank...
49 CFR 179.500-15 - Handling of tanks failing in tests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Handling of tanks failing in tests. 179.500-15 Section 179.500-15 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... 107A) § 179.500-15 Handling of tanks failing in tests. (a) Tanks rejected for failure in any of the...
49 CFR 179.500-15 - Handling of tanks failing in tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Handling of tanks failing in tests. 179.500-15 Section 179.500-15 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS...-113 and 107A) § 179.500-15 Handling of tanks failing in tests. (a) Tanks rejected for failure in any...
49 CFR 179.500-15 - Handling of tanks failing in tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Handling of tanks failing in tests. 179.500-15 Section 179.500-15 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... 107A) § 179.500-15 Handling of tanks failing in tests. (a) Tanks rejected for failure in any of the...
49 CFR 179.500-15 - Handling of tanks failing in tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Handling of tanks failing in tests. 179.500-15 Section 179.500-15 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... 107A) § 179.500-15 Handling of tanks failing in tests. (a) Tanks rejected for failure in any of the...
49 CFR 179.500-15 - Handling of tanks failing in tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Handling of tanks failing in tests. 179.500-15 Section 179.500-15 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... 107A) § 179.500-15 Handling of tanks failing in tests. (a) Tanks rejected for failure in any of the...
40 CFR 86.232-94 - Vehicle preconditioning.
Code of Federal Regulations, 2011 CFR
2011-07-01
... vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be filled to approximately the prescribed “tank fuel volume” with the test fuel specified § 86.213. If the existing fuel in the fuel tank(s) does not meet the specifications contained in § 86.213, the...
NASA Technical Reports Server (NTRS)
Flachbart, R. H.; Hedayat, A.; Holt, K. A.; Sims, J.; Johnson, E. F.; Hastings, L. J.; Lak, T.
2013-01-01
Cryogenic upper stages in the Space Shuttle program were prohibited primarily due to a safety risk of a 'return to launch site' abort. An upper stage concept addressed this concern by proposing that the stage be launched empty and filled using shuttle external tank residuals after the atmospheric pressure could no longer sustain an explosion. However, only about 5 minutes was allowed for tank fill. Liquid hydrogen testing was conducted within a near-ambient environment using the multipurpose hydrogen test bed 638.5 ft3 (18m3) cylindrical tank with a spray bar mounted longitudinally inside. Although the tank was filled within 5 minutes, chilldown of the tank structure was incomplete, and excessive tank pressures occurred upon vent valve closure. Elevated tank wall temperatures below the liquid level were clearly characteristic of film boiling. The test results have substantial implications for on-orbit cryogen transfer since the formation of a vapor film would be much less inhibited due to the reduced gravity. However, the heavy tank walls could become an asset in normal gravity testing for on-orbit transfer, i.e., if film boiling in a nonflight weight tank can be inhibited in normal gravity, then analytical modeling anchored with the data could be applied to reduced gravity environments with increased confidence.
Insulation systems for liquid methane fuel tanks for supersonic cruise aircraft
NASA Technical Reports Server (NTRS)
Brady, H. F.; Delduca, D.
1972-01-01
Two insulation systems for tanks containing liquid methane in supersonic cruise-type aircraft were designed and tested after an extensive materials investigation. One system is an external insulation and the other is an internal wet-type insulation system. Tank volume was maximized by making the tank shape approach a rectangular parallelopiped. One tank was designed to use the external insulation and the other tank to use the internal insulation. Performance of the external insulation system was evaluated on a full-scale tank under the temperature environment of -320 F to 700 F and ambient pressures of ground-level atmospheric to 1 psia. Problems with installing the internal insulation on the test tank prevented full-scale evaluation of performance; however, small-scale testing verified thermal conductivity, temperature capability, and installed density.
13-Foot Diameter Hydrogen Tank Tested in the K-Site Test Chamber
1967-09-21
A 13-foot diameter mounted inside the large test chamber at the Cryogenic Propellant Tank, or K-Site, at National Aeronautics and Space Administration’s (NASA) Plum Brook Station. The 25-foot test chamber and 20-foot access door were designed to test liquid hydrogen fuel tanks up to 18 feet in diameter in conditions that simulated launches and spaceflight. Shakers were installed to test the effects of launch vibration on the tanks and their insulation. The K Site chamber was also equipped with cold walls that could be cooled with either liquid nitrogen or liquid hydrogen and vacuum pumps that could reduce pressure levels to 10-8 torr. This 13-foot tank passed its initial acceptance tests in K-Site on August 24, 1966. Delays in the modification of the tank postponed further tests of the tank until May 1967. Four pressure hold tests and expulsion runs were made in May using gaseous hydrogen or gaseous helium at 300R and 520R. In June a straight pipe injector test was run and two pressure effect tests at 35 and 75psi. Propellant slosh tests were successfully run in August. This photograph was taken the day after the program’s final runs on September 12, 1967.
Blaser, Rachel E; Rosemberg, Denis B
2012-01-01
The effects of wall color stimuli on diving, and the effects of depth stimuli on scototaxis, were assessed in zebrafish. Three groups of fish were confined to a black, a white, or a transparent tank, and tested for depth preference. Two groups of fish were confined to a deep or a shallow tank, and tested for black-white preference. As predicted, fish preferred the deep half of a split-tank over the shallow half, and preferred the black half of a black/white tank over the white half. Results indicated that the tank wall color significantly affected depth preference, with the transparent tank producing the strongest depth preference and the black tank producing the weakest preference. Tank depth, however, did not significantly affect color preference. Additionally, wall color significantly affected shuttling and immobility, while depth significantly affected shuttling and thigmotaxis. These results are consistent with previous indications that the diving response and scototaxis may reflect dissociable mechanisms of behavior. We conclude that the two tests are complementary rather than interchangeable, and that further research on the motivational systems underlying behavior in each of the two tests is needed.
In-Tank Elutriation Test Report And Independent Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burns, H. H.; Adamson, D. J.; Qureshi, Z. H.
2011-04-13
The Department of Energy (DOE) Office of Environmental Management (EM) funded Technology Development and Deployment (TDD) to solve technical problems associated with waste tank closure for sites such as Hanford Site and Savannah River Site (SRS). One of the tasks supported by this funding at Savannah River National Laboratory (SRNL) and Pacific Northwest Laboratory (PNNL) was In-Tank Elutriation. Elutriation is the process whereby physical separation occurs based on particle size and density. This report satisfies the first phase of Task WP_1.3.1.1 In-Tank Elutriation, which is to assess the feasibility of this method of separation in waste tanks at Hanford Sitemore » and SRS. This report includes an analysis of scoping tests performed in the Engineering Development Laboratory of SRNL, analysis of Hanford's inadvertent elutriation, the viability of separation methods such as elutriation and hydrocyclones and recommendations for a path forward. This report will demonstrate that the retrieval of Hanford salt waste tank S-112 very successfully decreased the tank's inventories of radionuclides. Analyses of samples collected from the tank showed that concentrations of the major radionuclides Cs-136 and Sr-90 were decreased by factors of 250 and 6 and their total curie tank inventories decreased by factors of 60,000 and 2000. The total tank curie loading decreased from 300,000 Ci to 55 Ci. The remaining heel was nearly all innocuous gibbsite, Al(OH){sub 3}. However, in the process of tank retrieval approximately 85% of the tank gibbsite was also removed. Significant amounts of money and processing time could be saved if more gibbsite could be left in tanks while still removing nearly all of the radionuclides. There were factors which helped to make the elutriation of Tank S-112 successful which would not necessarily be present in all salt tanks. 1. The gibbsite particles in the tank were surprisingly large, as much as 200 {micro}m. The gibbsite crystals had probably grown in size over a period of decades. 2. The radionuclides were apparently either in the form of soluble compounds, like cesium, or micrometer sized particles of actinide oxides or hydroxides. 3. After the initial tank retrieval the tank contained cobble which is not conducive to elutriation. Only after the tank contents were treated with thousands of gallons of 50 wt% caustic, were the solids converted to sand which is compatible with elutriation. Discussions between SRNL and PNNL resulted in plans to test elutriation in two phases; in Phase 1 particles would be separated by differences in settling velocity in an existing scaled tank with its associated hardware and in Phase 2 additional hardware, such as a hydrocyclone, would be added downstream to separate slow settling partciels from liquid. Phase 1 of in-tank elutriation was tested for Proof of Principle in theEngineering Development Laboratory of SRNL in a 41" diameter, 87 gallon tank. The tank had been previously used as a 1/22 scale model of Hanford Waste Tank AY-102. The objective of the testing was to determine which tank operating parameters achieved the best separation between fast- and slow-settling particles. For Phase 1 testing a simulated waste tank supernatant, slow-settling particles and fast-settling particles were loaded to the scaled tank. Because this was a Proof of Principle test, readily available solids particles were used that represented fast-settling and slow-settling particles. The tank contents were agitated using rotating mixer jet pumps (MJP) which suspended solids while liquids and solids were drawn out of the tank with a suction tube. The goal was to determine the optimum hydraulic operating conditions to achieve clean separation in which the residual solids in the tank were nearly all fast-settling particles and the solids transferred out of the tank were nearly all slow-settling particles. Tests were conducted at different pump jet velocities, suction tube diameters and suction tube elevations. Testing revealed that the most important variable was jet velocity which translates to a downstream fluid velocity in the vicinity of the suction tube which can suspend particles and potentially allow their removal from the tank. The optimum jet velocity in the vicinity of the sucti9on tube was between 1.5 and 2 ft/s (4-5 gpm). During testing at lower velocities a significant amount of slow-settling particles remained in the tank. At higher velocities a significant amount of fast-settling particles were elutriated from the tank. It should be noted that this range of velocities is appropriate for this particular geometry and particles. However, the principle of In-Tank Elutriation was proved. In-tank elutriation has the potential to save much money in tank closure. However, more work, both analytical and experimental, must be done before an improved version of the process could be applied to actual waste tanks. It is recommended that testing with more prototypic simulants be conducted. Also, scale-up criteria for elutriation and the resulting size of pilot scale test equipment require investigation during future research. In addition, it is recommended that the use of hydrocyclones be pursued in Phase 2 testing. Hydrocyclones are a precise and efficient separation tool that are frequently used in industry.« less
40 CFR 86.1772-99 - Road load power, test weight, and inertia weight class determination.
Code of Federal Regulations, 2012 CFR
2012-07-01
... vehicle under all-electric power to complete the running loss test fuel tank temperature profile test sequence without air conditioning and the same vehicle tested over the running loss test fuel tank... fan modes with the system set at 72 deg. F. The running loss test fuel tank temperature profile test...
40 CFR 86.1772-99 - Road load power, test weight, and inertia weight class determination.
Code of Federal Regulations, 2011 CFR
2011-07-01
... vehicle under all-electric power to complete the running loss test fuel tank temperature profile test sequence without air conditioning and the same vehicle tested over the running loss test fuel tank... fan modes with the system set at 72 deg. F. The running loss test fuel tank temperature profile test...
40 CFR 86.1772-99 - Road load power, test weight, and inertia weight class determination.
Code of Federal Regulations, 2013 CFR
2013-07-01
... vehicle under all-electric power to complete the running loss test fuel tank temperature profile test sequence without air conditioning and the same vehicle tested over the running loss test fuel tank... fan modes with the system set at 72 deg. F. The running loss test fuel tank temperature profile test...
Credit WCT. Photographic copy of photograph, low level aerial view ...
Credit WCT. Photographic copy of photograph, low level aerial view of Test Stand "D," looking due south, after completion of Dd station installation in 1961. Note Test Stand "D" "neutralization pond" to immediate southeast of tower. A steel barrier north of and parallel to the Dd station separates fuel run tanks (on south side obscured from view) from oxidizer run tanks (on north side). Small Dj injector test stand is visible to the immediate left of oxidizer run tanks; it is oriented on a northeast/southwest diagonal to the Dd test station. The large tank to the north of the oxidizer run tanks (near center bottom of view) is an oxidizer storage tank for nitrogen tetroxide. Slender tanks to the northwest of the tower (lower right of view) contain high pressure nitrogen gas. A large vertical tank at the base of the tower contains distilled water for flushing propellant lines. (JPL negative no. 384-2997-B, 12 December 1961) - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA
Glass Bubbles Insulation for Liquid Hydrogen Storage Tanks
NASA Astrophysics Data System (ADS)
Sass, J. P.; Cyr, W. W. St.; Barrett, T. M.; Baumgartner, R. G.; Lott, J. W.; Fesmire, J. E.
2010-04-01
A full-scale field application of glass bubbles insulation has been demonstrated in a 218,000 L liquid hydrogen storage tank. This work is the evolution of extensive materials testing, laboratory scale testing, and system studies leading to the use of glass bubbles insulation as a cost efficient and high performance alternative in cryogenic storage tanks of any size. The tank utilized is part of a rocket propulsion test complex at the NASA Stennis Space Center and is a 1960's vintage spherical double wall tank with an evacuated annulus. The original perlite that was removed from the annulus was in pristine condition and showed no signs of deterioration or compaction. Test results show a significant reduction in liquid hydrogen boiloff when compared to recent baseline data prior to removal of the perlite insulation. The data also validates the previous laboratory scale testing (1000 L) and full-scale numerical modeling (3,200,000 L) of boiloff in spherical cryogenic storage tanks. The performance of the tank will continue to be monitored during operation of the tank over the coming years.
Reusable LH2 tank technology demonstration through ground test
NASA Technical Reports Server (NTRS)
Bianca, C.; Greenberg, H. S.; Johnson, S. E.
1995-01-01
The paper presents the project plan to demonstrate, by March 1997, the reusability of an integrated composite LH2 tank structure, cryogenic insulation, and thermal protection system (TPS). The plan includes establishment of design requirements and a comprehensive trade study to select the most suitable Reusable Hydrogen Composite Tank system (RHCTS) within the most suitable of 4 candidate structural configurations. The 4 vehicles are winged body with the capability to deliver 25,000 lbs of payload to a circular 220 nm, 51.6 degree inclined orbit (also 40,000 lbs to a 28.5 inclined 150 nm orbit). A prototype design of the selected RHCTS is established to identify the construction, fabrication, and stress simulation and test requirements necessary in an 8 foot diameter tank structure/insulation/TPS test article. A comprehensive development test program supports the 8 foot test article development and involves the composite tank itself, cryogenic insulation, and integrated tank/insulation/TPS designs. The 8 foot diameter tank will contain the integrated cryogenic insulation and TPS designs resulting from this development and that of the concurrent lightweight durable TPS program. Tank ground testing will include 330 cycles of LH2 filling, pressurization, body loading, depressurization, draining, and entry heating.
Conventional fuel tank blunt impact tests : test and analysis results
DOT National Transportation Integrated Search
2014-04-02
The Federal Railroad Administrations Office of Research : and Development is conducting research into fuel tank : crashworthiness. A series of impact tests are planned to : measure fuel tank deformation under two types of dynamic : loading conditi...
Test requirements of locomotive fuel tank blunt impact tests
DOT National Transportation Integrated Search
2013-10-15
The Federal Railroad Administrations Office of Research : and Development is conducting research into passenger : locomotive fuel tank crashworthiness. A series of impact tests : are planned to measure fuel tank deformation under two types : of dy...
Full scale tank car coupler impact tests
DOT National Transportation Integrated Search
2003-11-15
Full scale tests were performed to investigate various : aspects of tank car behavior during coupler impacts. A tank car : was equipped with 37 accelerometers and an instrumented : coupler. Two series of full scale coupler impact tests, : comprising ...
Development and Testing of a Mobile Platform for Tank Remediation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nance, T.A.
2001-01-16
The Department of Energy (DOE) is committed to removing millions of gallons of high level radioactive waste from waste storage tanks at the Savannah River Site (SRS). SRS was the first site in the DOE complex to have emptied and closed high level waste tanks. Tank closure at the Site is now progressing to tanks containing waste composed of liquid and large deposits of solids, including a tank that has a potential ''heel''. A heel is a hardened mass of solid waste material spread across the tank bottom. Tank closure requires breaking up this heel and moving the material tomore » the intake of a pumping system for transfer from the tank. In the past, overhead spray systems have been used with some success at moving waste. But the limited number of risers restricts the coverage area of the overhead spray system. Therefore, a floor- level spray system will be used to separate manageable size chunks of the material from the heel. The chunks will be guided into the pump's intake to be remove from the tank. The floor-level spray system movement will be accomplished by using a mobile platform, a crawler, which provides transport to nearly every point on the tank floor. Transport of the spray system will allow the system to ''corral'' the waste away from the tank walls and control the movement of the material across the tank floor. Because the available access riser is small, and a wide crawler platform is required to support the spray system, the crawler's frame must fold to enter the tank. After entry into the tank, the crawler unfolds on the tank floor using the crawler drive tracks to expand the frame and position the mobile platform under the entry riser. The spray system will then be lowered separately through the entry riser and mated onto the crawler on the tank floor. The crawler and spray system are tethered and controlled remotely by personnel at the control station. Motorized cable reels will also be remotely controlled to pay out, retrieve, and manage the tethers as the mobile platform moves the spray system across the tank floor. Both the crawler and spray systems are designed to be retrievable. Development of the tank cleaning system was evaluated using a performance test program. The tests evaluated the spray system dynamics, the crawler's fit through the riser, the crawler landing in mocked up tank with simulant, the crawler's traction, and the crawler and spray system mating. Initial testing verified the crawler platform was compatible with the dynamics produced by the spray system. The riser fit test confirmed that a dedicated riser is required for deployment of the crawler and the spray system. The crawler traction test defined the capabilities of the crawler at different levels of simulant. Deployment testing through a mockup riser verified the basic system processes. Finally, testing of the complete system in a full-scale mockup with sludge simulant was performed to evaluate the tank cleaning ability of the crawler. This paper describes th e tank conditions, the tank closure process, the development of the crawler and spray system, and the testing program and results used to evaluate the mobile platform and spray system.« less
40 CFR 1060.520 - How do I test fuel tanks for permeation emissions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false How do I test fuel tanks for... STATIONARY EQUIPMENT Test Procedures § 1060.520 How do I test fuel tanks for permeation emissions? Measure...) Preconditioning durability testing. Take the following steps before an emission test, in any order, if your...
40 CFR 1060.520 - How do I test fuel tanks for permeation emissions?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false How do I test fuel tanks for... STATIONARY EQUIPMENT Test Procedures § 1060.520 How do I test fuel tanks for permeation emissions? Measure...) Preconditioning durability testing. Take the following steps before an emission test, in any order, if your...
40 CFR 1060.520 - How do I test fuel tanks for permeation emissions?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false How do I test fuel tanks for... STATIONARY EQUIPMENT Test Procedures § 1060.520 How do I test fuel tanks for permeation emissions? Measure...) Preconditioning durability testing. Take the following steps before an emission test, in any order, if your...
40 CFR 1060.520 - How do I test fuel tanks for permeation emissions?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false How do I test fuel tanks for... STATIONARY EQUIPMENT Test Procedures § 1060.520 How do I test fuel tanks for permeation emissions? Measure...) Preconditioning durability testing. Take the following steps before an emission test, in any order, if your...
40 CFR 1060.520 - How do I test fuel tanks for permeation emissions?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false How do I test fuel tanks for... STATIONARY EQUIPMENT Test Procedures § 1060.520 How do I test fuel tanks for permeation emissions? Measure...) Preconditioning durability testing. Take the following steps before an emission test, in any order, if your...
Liquid Hydrogen Propellant Tank Sub-Surface Pressurization with Gaseous Helium
NASA Technical Reports Server (NTRS)
Stephens, J. R.; Cartagena, W.
2015-01-01
A series of tests were conducted to evaluate the performance of a propellant tank pressurization system with the pressurant diffuser intentionally submerged beneath the surface of the liquid. Propellant tanks and pressurization systems are typically designed with the diffuser positioned to apply pressurant gas directly into the tank ullage space when the liquid propellant is settled. Space vehicles, and potentially propellant depots, may need to conduct tank pressurization operations in micro-gravity environments where the exact location of the liquid relative to the diffuser is not well understood. If the diffuser is positioned to supply pressurant gas directly to the tank ullage space when the propellant is settled, then it may become partially or completely submerged when the liquid becomes unsettled in a microgravity environment. In such case, the pressurization system performance will be adversely affected requiring additional pressurant mass and longer pressurization times. This series of tests compares and evaluates pressurization system performance using the conventional method of supplying pressurant gas directly to the propellant tank ullage, and then supplying pressurant gas beneath the liquid surface. The pressurization tests were conducted on the Engineering Development Unit (EDU) located at Test Stand 300 at NASA Marshall Space Flight Center (MSFC). EDU is a ground based Cryogenic Fluid Management (CFM) test article supported by Glenn Research Center (GRC) and MSFC. A 150 ft3 propellant tank was filled with liquid hydrogen (LH2). The pressurization system used regulated ambient helium (GHe) as a pressurant, a variable position valve to maintain flow rate, and two identical independent pressurant diffusers. The ullage diffuser was located in the forward end of the tank and was completely exposed to the tank ullage. The submerged diffuser was located in the aft end of the tank and was completely submerged when the tank liquid level was 10% or greater. The ullage diffuser tests were conducted as a baseline to evaluate the performance of the pressurization system, and the submerged diffuser tests showed how the performance of the pressurization system was compromised when the diffuser was submerged in LH2. The test results are evaluated and compared, and included in this report for various propellant tank fill levels.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
... private pilot certificate and the instrument rating. These documents are available for public review... Airman Testing Standards and Training (2) Draft PRIVATE PILOT--AIRPLANE Airman Certification Standards; (3) Draft Change Tracking Matrix referenced to FAA-S-8081-14B, Private Pilot Practical Test Standards...
46 CFR 61.35-3 - Required tests and checks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... heaters without water level controls) must be tested by interrupting the feed water supply. Manual reset... alarm and visible indicator must be verified. The shutdown times must be verified. (3) Fuel supply... draft loss interlock switch must be tested to ensure proper operation. The draft limit control must...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-25
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-0938] Draft Guidance for Industry on Abbreviated New Drug Applications: Stability Testing of Drug Substances... their complexity, the FDA is considering standardizing stability testing policies by adopting...
33 CFR 183.580 - Static pressure test for fuel tanks.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...
33 CFR 183.580 - Static pressure test for fuel tanks.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...
33 CFR 183.580 - Static pressure test for fuel tanks.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...
33 CFR 183.580 - Static pressure test for fuel tanks.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...
33 CFR 183.580 - Static pressure test for fuel tanks.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duncan, J.B.
1997-01-07
This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.
Thermodynamic Vent System Test in a Low Earth Orbit Simulation
NASA Technical Reports Server (NTRS)
VanOverbeke, Thomas J.
2004-01-01
A thermodynamic vent system for a cryogenic nitrogen tank was tested in a vacuum chamber simulating oxygen storage in low earth orbit. The nitrogen tank was surrounded by a cryo-shroud at -40 F. The tank was insulated with two layers of multi-layer insulation. Heat transfer into cryogenic tanks causes phase change and increases tank pressure which must be controlled. A thermodynamic vent system was used to control pressure as the location of vapor is unknown in low gravity and direct venting would be wasteful. The thermodynamic vent system consists of a Joule-Thomson valve and heat exchanger installed on the inlet side of the tank mixer-pump. The combination is used to extract thermal energy from the tank fluid, reducing temperature and ullage pressure. The system was sized so that the tank mixer-pump operated a small fraction of the time to limit motor heating. Initially the mixer used sub-cooled liquid to cool the liquid-vapor interface inducing condensation and pressure reduction. Later, the thermodynamic vent system was used. Pressure cycles were performed until steady-state operation was demonstrated. Three test runs were conducted at tank fills of 97, 80, and 63 percent. Each test was begun with a boil-off test to determine heat transfer into the tank. The lower tank fills had time averaged vent rates very close to steady-state boil-off rates showing the thermodynamic vent system was nearly as efficient as direct venting in normal gravity.
2017-12-08
A liquid oxygen test tank was completed in the Prototype Development Laboratory at NASA's Kennedy Space Center in Florida. A banner signing event marked the successful delivery of the tank called Tardis. Engineers and technicians worked together to develop the tank and build it at the lab to support cryogenic testing at Johnson Space Center's White Sands Test Facility in Las Cruces, New Mexico. The 12-foot-tall, 3,810-pound aluminum tank will be shipped to White Sands for testing.
2011-06-08
Construction of the A-3 Test Stand at Stennis Space Center continued June 8 with installation of a 35,000-gallon liquid oxygen tank atop the steel structure. The stand is being built to test next-generation rocket engines that will carry humans into deep space once more. The LOX tank and a liquid hydrogen tank to be installed atop the stand later will provide propellants for testing the engines. The A-3 Test Stand is scheduled for completion and activation in 2013.
NASA Technical Reports Server (NTRS)
Free, James M.
1993-01-01
This paper assesses the feasibility of using eddy current nondestructive examination to determine flaw sizes in completely assembled hydrazine propellant tanks. The study was performed by the NASA Goddard Space Flight Center for the Tropical Rainfall Measuring Mission (TRMM) project to help determine whether existing propellant tanks could meet the fracture analysis requirements of the current pressure vessel specification, MIL-STD-1522A and, therefore be used on the TRMM spacecraft. After evaluating several nondestructive test methods, eddy current testing was selected as the most promising method for determining flaw sizes on external and internal surfaces of completely assembled tanks. Tests were conducted to confirm the detection capability of the eddy current NDE, procedures were developed to inspect two candidate tanks, and the test support equipment was designed. The non-spherical tank eddy current NDE test program was terminated when the decision was made to procure new tanks for the TRMM propulsion subsystem. The information on the development phase of this test program is presented in this paper as a reference for future investigation on the subject.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Installation Restoration Program (IRP) site ST005, otherwise known as the POL Tank Farm, at Galena Airport, Alaska. This decision is based on the administrative record for this site, specifically the draft Remedial Investigation Report (March 1995) and the Treatability Study Report (January 1995) (PB95-225314). The information from these documents is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
NASA Technical Reports Server (NTRS)
Nahra, Henry; Ghosn, Louis; Christiansen, Eric; Davis, B. Alan; Keddy, Chris; Rodriquez, Karen; Miller, Joshua; Bohl, William
2011-01-01
Metallic pressure tanks used in space missions are inherently vulnerable to hypervelocity impacts from micrometeoroids and orbital debris; thereby knowledge of impact damage and its effect on the tank integrity is crucial to a spacecraft risk assessment. This paper describes tests that have been performed to assess the effects of hypervelocity impact (HVI) damage on Titanium alloy (Ti-6Al-4V) pressure vessels burst pressure and characteristics. The tests consisted of a pair of HVI impact tests on water-filled Ti-6Al-4V tanks (water being used as a surrogate to the actual propellant) and subsequent burst tests as well as a burst test on an undamaged control tank. The tanks were placed behind Aluminum (Al) shields and then each was impacted with a 7 km/s projectile. The resulting impact debris plumes partially penetrated the Ti-6Al-4V tank surfaces resulting in a distribution of craters. During the burst tests, the tank that failed at a lower burst pressure did appear to have the failure initiating at a crater site with observed spall cracks. A fracture mechanics analysis showed that the tanks failure at the impact location may have been due to a spall crack that formed upon impact of a fragmentation on the Titanium surface. This result was corroborated with a finite element analysis from calculated Von-Mises and hoop stresses.
Thermal-Mechanical Cyclic Test of a Composite Cryogenic Tank for Reusable Launch Vehicles
NASA Technical Reports Server (NTRS)
Messinger, Ross; Pulley, John
2003-01-01
This viewgraph presentation provides an overview of thermal-mechanical cyclic tests conducted on a composite cryogenic tank designed for reusable launch vehicles. Topics covered include: a structural analysis of the composite cryogenic tank, a description of Marshall Space Flight Center's Cryogenic Structure Test Facility, cyclic test plans and accomplishments, burst test and analysis and post-testing evaluation.
40 CFR 265.191 - Assessment of existing tank system's integrity.
Code of Federal Regulations, 2010 CFR
2010-07-01
...); and (5) Results of a leak test, internal inspection, or other tank integrity examination such that: (i) For non-enterable underground tanks, this assessment must consist of a leak test that is capable of... water table effects, (ii) For other than non-enterable underground tanks and for ancillary equipment...
40 CFR 264.191 - Assessment of existing tank system's integrity.
Code of Federal Regulations, 2010 CFR
2010-07-01
...); and (5) Results of a leak test, internal inspection, or other tank integrity examination such that: (i) For non-enterable underground tanks, the assessment must include a leak test that is capable of taking into account the effects of temperature variations, tank end deflection, vapor pockets, and high water...
Solar-energy-system performance evaluation: Honeywell OTS 44, Ocmulgee, Georgia
NASA Technical Reports Server (NTRS)
Mathur, A. K.; Pederson, S.
1982-01-01
The operation and technical performance of the solar operational test site (OTS 44) are described, based on data collected between April, 1981 and August, 1981. The following topics are discussed: system description, performance assessment, operating energy, energy savings, system maintenance, and conclusions. The solar energy system at OTS 44 is a hydronic heating and cooling system consisting of 5040 square feet of liquid cooled flat plate collectors; a 4000 gallon thermal storage tank; one 25 ton capacity organic Rankine cycle engine assisted water chillers; a forced draft cooling tower; and associated piping, pumps, valves, controls and heat rejection equipment. The solar system has eight basic modes of operation and several combination modes for providing space conditioning and hot water to the building. Data monitored during the 4 months of the operational test period found that the solar system collected 285 MMBtu of thermal energy of the total incident solar energy of 1040 MMBtu and provided 210 MMBtu for cooling and 10 MMBtu for heating and hot water. The net electrical energy saving due to the solar system was approximately 2600 kWh(e), and fossil energy saving was about 20 million Btu (MMBtu).
Thermal performance of a customized multilayer insulation (MLI)
NASA Technical Reports Server (NTRS)
Leonhard, K. E.
1976-01-01
The thermal performance of a LH2 tank on a shroudless vehicle was investigated. The 1.52 m (60 in) tank was insulated with 2 MLI blankets consisting of 18 double aluminized Mylar radiation shields and 19 silk net spacers. The temperature of outer space was simulated by using a cryoshroud which was maintained at near liquid hydrogen temperature. The heating effects of a payload were simulated by utilizing a thermal payload simulator (TPS) viewing the tank. The test program consisted of three major test categories: (1) null testing, (2) thermal performance testing of the tank installed MLI system, and (3) thermal testing of a customized MLI configuration. TPS surface temperatures during the null test were maintained at near hydrogen temperature and during test categories 2 and 3 at 289 K (520R). The heat flow rate through the tank installed MLI at a tank/TPS spacing of 0.457 m was 1.204 watts with no MLI on the TPS and 0.059 watts through the customized MLI with three blankets on the TPS. Reducing the tank/TPS spacing from 0.457 m to 0.152 m the heat flow through the customized MLI increased by 10 percent.
49 CFR 179.500-7 - Physical tests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Physical tests. 179.500-7 Section 179.500-7... Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-7 Physical tests. (a) Physical tests shall be made on two test specimens 0.505 inch in diameter within 2-inch gauge length, taken...
49 CFR 179.500-7 - Physical tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Physical tests. 179.500-7 Section 179.500-7... Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-7 Physical tests. (a) Physical tests shall be made on two test specimens 0.505 inch in diameter within 2-inch gauge length, taken...
49 CFR 179.500-7 - Physical tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Physical tests. 179.500-7 Section 179.500-7... Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-7 Physical tests. (a) Physical tests shall be made on two test specimens 0.505 inch in diameter within 2-inch gauge length, taken...
49 CFR 179.500-7 - Physical tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Physical tests. 179.500-7 Section 179.500-7... Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-7 Physical tests. (a) Physical tests shall be made on two test specimens 0.505 inch in diameter within 2-inch gauge length, taken...
49 CFR 178.347-5 - Pressure and leakage test.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test... pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection pressure is tank...
49 CFR 178.347-5 - Pressure and leakage test.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test... pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection pressure is tank...
49 CFR 178.347-5 - Pressure and leakage test.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test... pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection pressure is tank...
49 CFR 178.347-5 - Pressure and leakage test.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test... pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection pressure is tank...
Battleship tank firing test of H-II launch vehicle - First stage
NASA Astrophysics Data System (ADS)
Watanabe, Atsutaro; Endo, Mamoru; Yamazaki, Isao; Maemura, Takashi; Namikawa, Tatsuo
1991-06-01
The H-II launch vehicle capable of placing 2-ton-class payloads on geostationary orbits is outlined, and focus is placed on its propulsion system. The development status of the project, including component development, preliminary battleship tank firing test (BFT-1), battleship tank firing test (BFT-2), and flight-type tank firing test (CFT) is discussed. The configuration and schematic diagram of BFT-2 are presented, and the firing test results of BFT-2 first series are analyzed, including engine performance, interface compatibility, and pressurization of subsystems.
Liquid Transfer Cryogenic Test Facility: Initial hydrogen and nitrogen no-vent fill data
NASA Astrophysics Data System (ADS)
Moran, Matthew E.; Nyland, Ted W.; Papell, S. Stephen
1990-03-01
The Liquid Transfer Cryogenic Test Facility is a versatile testbed for ground-based cryogenic fluid storage, handling, and transfer experimentation. The test rig contains two well instrumented tanks, and a third interchangeable tank, designed to accommodate liquid nitrogen or liquid hydrogen testing. The internal tank volumes are approx. 18, 5, and 1.2 cu. ft. Tank pressures can be varied from 2 to 30 psia. Preliminary no vent fill tests with nitrogen and hydrogen were successfully completed with the test rig. Initial results indicate that no vent fills of nitrogen above 90 percent full are achievable using this test configuration, in a 1-g environment, and with inlet liquid temperatures as high as 143 R, and an average tank wall temperature of nearly 300 R. This inlet temperature corresponds to a saturation pressure of 19 psia for nitrogen. Hydrogen proved considerably more difficult to transfer between tanks without venting. The highest temperature conditions resulting in a fill level greater than 90 percent were with an inlet liquid temperature of 34 R, and an estimated tank wall temperature of slightly more than 100 R. Saturation pressure for hydrogen at this inlet temperature is 10 psia. All preliminary no vent fill tests were performed with a top mounted full cone nozzle for liquid injection. The nozzle produces a 120 degree conical droplet spray at a differential pressure of 10 psi. Pressure in the receiving tank was held to less than 30 psia for all tests.
Liquid Transfer Cryogenic Test Facility: Initial hydrogen and nitrogen no-vent fill data
NASA Technical Reports Server (NTRS)
Moran, Matthew E.; Nyland, Ted W.; Papell, S. Stephen
1990-01-01
The Liquid Transfer Cryogenic Test Facility is a versatile testbed for ground-based cryogenic fluid storage, handling, and transfer experimentation. The test rig contains two well instrumented tanks, and a third interchangeable tank, designed to accommodate liquid nitrogen or liquid hydrogen testing. The internal tank volumes are approx. 18, 5, and 1.2 cu. ft. Tank pressures can be varied from 2 to 30 psia. Preliminary no vent fill tests with nitrogen and hydrogen were successfully completed with the test rig. Initial results indicate that no vent fills of nitrogen above 90 percent full are achievable using this test configuration, in a 1-g environment, and with inlet liquid temperatures as high as 143 R, and an average tank wall temperature of nearly 300 R. This inlet temperature corresponds to a saturation pressure of 19 psia for nitrogen. Hydrogen proved considerably more difficult to transfer between tanks without venting. The highest temperature conditions resulting in a fill level greater than 90 percent were with an inlet liquid temperature of 34 R, and an estimated tank wall temperature of slightly more than 100 R. Saturation pressure for hydrogen at this inlet temperature is 10 psia. All preliminary no vent fill tests were performed with a top mounted full cone nozzle for liquid injection. The nozzle produces a 120 degree conical droplet spray at a differential pressure of 10 psi. Pressure in the receiving tank was held to less than 30 psia for all tests.
EPA Releases Draft Policy to Reduce Animal Testing for Skin Sensitization
The document, Draft Interim Science Policy: Use of Alternative Approaches for Skin Sensitization as a Replacement for Laboratory Animal Testing, describes the science behind the non-animal alternatives that can now be used to identify skin sensitization.
Liquid Motion Experiment Flight Test Results
NASA Technical Reports Server (NTRS)
Chato David J.; Dalton, Penni J.; Dodge, Franklin T.; Green, Steve
1998-01-01
The Liquid Motion Experiment (LME), designed to study the effects of liquid motion in rotating tanks, was flown on STS 84. LME was essentially a spin table that created a realistic nutation motion of scale-model tanks containing liquid. TWo spherical and two cylindrical transparent tanks were tested simultaneously, and three sets of such tanks were employed to vary liquid viscosity, fill level, and propellant management device (PMD) design. All the tanks were approximately 4.5 inches diameter. The primary test measurements were the radial and tangential torques exerted on the tanks by the liquid. Resonant frequencies and damping of the liquid oscillations were determined by sine sweep tests. For a given tank shape, the resonant frequency depended on fill level. For the cylindrical tanks, the resonances had somewhat different frequencies for the tangential axis (0.55 to 0.75 times spin rate) and the radial axis (0.73 to 0.78 times spin rate), and the tangential axis resonance agreed more closely with available analytical models. For the spherical tanks, the resonant frequencies were between 0.74 to 0.77 times the spin rate and were the same for the tangential and radial axes. The damping coefficients varied from about I% to 3% of critical, depending on tank shape, fill level, and liquid viscosity. 'Me viscous energy dissipation rates of the liquid oscillations were determined from sine dwell tests. The LME energy dissipation rates varied from 0.3 to 0.5 times the estimates obtained from scaling previous ground tests and spacecraft flight data. The PNDs sometimes enhanced the resonances and energy dissipation rates and sometimes decreased them, which points out the need to understand better the effects of PMD on liquid motion as a function of PMD and tank design.
Review and test of chilldown methods for space-based cryogenic tanks
NASA Astrophysics Data System (ADS)
Chato, David J.; Sanabria, Rafael
The literature for tank chilldown methods applicable to cryogenic tankage in the zero gravity environment of earth orbit is reviewed. One method is selected for demonstration in a ground based test. The method selected for investigation was the charge-hold-vent method which uses repeated injection of liquid slugs, followed by a hold to allow complete vaporization of the liquid and a vent of the tank to space vacuum to cool tankage to the desired temperature. The test was conducted on a 175 cubic foot, 2219 aluminum walled tank weighing 329 pounds, which was previously outfitted with spray systems to test nonvented fill technologies. To minimize hardware changes, a simple control-by-pressure scheme was implemented to control injected liquid quantities. The tank cooled from 440 R sufficiently in six charge-hold-vent cycles to allow a complete nonvented fill of the test tank. Liquid hydrogen consumed in the process is estimated at 32 pounds.
Review and test of chilldown methods for space-based cryogenic tanks
NASA Technical Reports Server (NTRS)
Chato, David J.; Sanabria, Rafael
1991-01-01
The literature for tank chilldown methods applicable to cryogenic tankage in the zero gravity environment of earth orbit is reviewed. One method is selected for demonstration in a ground based test. The method selected for investigation was the charge-hold-vent method which uses repeated injection of liquid slugs, followed by a hold to allow complete vaporization of the liquid and a vent of the tank to space vacuum to cool tankage to the desired temperature. The test was conducted on a 175 cubic foot, 2219 aluminum walled tank weighing 329 pounds, which was previously outfitted with spray systems to test nonvented fill technologies. To minimize hardware changes, a simple control-by-pressure scheme was implemented to control injected liquid quantities. The tank cooled from 440 R sufficiently in six charge-hold-vent cycles to allow a complete nonvented fill of the test tank. Liquid hydrogen consumed in the process is estimated at 32 pounds.
Development and flight test of metal-lined CFRP cryogenic tank for reusable rocket
NASA Astrophysics Data System (ADS)
Higuchi, Ken; Takeuchi, Shinsuke; Sato, Eiichi; Naruo, Yoshihiro; Inatani, Yoshifumi; Namiki, Fumiharu; Tanaka, Kohtaro; Watabe, Yoko
2005-07-01
A cryogenic tank made of carbon fiber reinforced plastic (CFRP) shell with aluminum thin liner has been designed as a liquid hydrogen (LH2) tank for an ISAS reusable launch vehicle, and the function of it has been proven by repeated flights onboard the test vehicle called reusable vehicle testing (RVT) in October 2003. The liquid hydrogen tank has to be a pressure vessel, because the fuel of the engine of the test vehicle is supplied by fuel pressure. The pressure vessel of a combination of the outer shell of CFRP for strength element at a cryogenic temperature and the inner liner of aluminum for gas barrier has shown excellent weight merit for this purpose. Interfaces such as tank outline shape, bulk capacity, maximum expected operating pressure (MEOP), thermal insulation, pipe arrangement, and measurement of data are also designed to be ready onboard. This research has many aims, not only development of reusable cryogenic composite tank but also the demonstration of repeated operation including thermal cycle and stress cycle, familiarization with test techniques of operation of cryogenic composite tanks, and the accumulation of data for future design of tanks, vehicle structures, safety evaluation, and total operation systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rogers, Ben C.; Heacker, Fred K.; Shannon, Christopher
2013-07-01
The U.S. Department of Energy (DOE) needs to safely and efficiently treat its 'legacy' transuranic (TRU) waste and mixed low-level waste (LLW) from past research and defense activities at the Oak Ridge National Laboratory (ORNL) so that the waste is prepared for safe and secure disposal. The TWPC operates an Environmental Management (EM) waste processing facility on the Oak Ridge Reservation (ORR). The TWPC is classified as a Hazard Category 2, non-reactor nuclear facility. This facility receives, treats, and packages low-level waste and TRU waste stored at various facilities on the ORR for eventual off-site disposal at various DOE sitesmore » and commercial facilities. The Remote Handled TRU Waste Sludge held in the Melton Valley Storage Tanks (MVSTs) was produced as a result of the collection, treatment, and storage of liquid radioactive waste originating from the ORNL radiochemical processing and radioisotope production programs. The MVSTs contain most of the associated waste from the Gunite and Associated Tanks (GAAT) in the ORNL's Tank Farms in Bethel Valley and the sludge (SL) and associated waste from the Old Hydro-fracture Facility tanks and other Federal Facility Agreement (FFA) tanks. The SL Processing Facility Build-outs (SL-PFB) Project is integral to the EM cleanup mission at ORNL and is being accelerated by DOE to meet updated regulatory commitments in the Site Treatment Plan. To meet these commitments a Baseline (BL) Change Proposal (BCP) is being submitted to provide continued spending authority as the project re-initiation extends across fiscal year 2012 (FY2012) into fiscal year 2013. Future waste from the ORNL Building 3019 U-233 Disposition project, in the form of U-233 dissolved in nitric acid and water, down-blended with depleted uranyl nitrate solution is also expected to be transferred to the 7856 MVST Annex Facility (formally the Capacity Increase Project (CIP) Tanks) for co-processing with the SL. The SL-PFB project will construct and install the necessary integrated systems to process the accumulated MVST Facilities SL inventory at the TWPC thus enabling safe and effective disposal of the waste. This BCP does not include work to support current MVST Facility Surveillance and Maintenance programs or the ORNL Building 3019 U-233 Disposition project, since they are not currently part of the TWPC prime contract. The purpose of the environmental compliance strategy is to identify the environmental permits and other required regulatory documents necessary for the construction and operation of the SL- PFB at the TWPC, Oak Ridge, TN. The permits and other regulatory documents identified are necessary to comply with the environmental laws and regulations of DOE Orders, and other requirements documented in the SL-PFB, Safety Design Strategy (SDS), SL-A-AD-002, R0 draft, and the Systems, Function and Requirements Document (SFRD), SL-X-AD-002, R1 draft. This compliance strategy is considered a 'living strategy' and it is anticipated that it will be revised as design progresses and more detail is known. The design basis on which this environmental permitting and compliance strategy is based is the Wastren Advantage, Inc., (WAI), TWPC, SL-PFB (WAI-BL-B.01.06) baseline. (authors)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-12
..., and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants, Draft... Dynamic Restraints (Snubbers) at Nuclear Power Plants, Draft Report for Comment.'' DATES: Please submit... System (ADAMS): Publicly available documents created or received at the NRC are available electronically...
Acoustic Emission Monitoring of the DC-XA Composite Liquid Hydrogen Tank During Structural Testing
NASA Technical Reports Server (NTRS)
Wilkerson, C.
1996-01-01
The results of acoustic emission (AE) monitoring of the DC-XA composite liquid hydrogen tank are presented in this report. The tank was subjected to pressurization, tensile, and compressive loads at ambient temperatures and also while full of liquid nitrogen. The tank was also pressurized with liquid hydrogen. AE was used to monitor the tank for signs of structural defects developing during the test.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-26
... components, including Source Plasma. The guidance announced in this notice replaces the draft guidance... before it begins work on the final version of the guidance, submit either electronic or written comments... the SUPPLEMENTARY INFORMATION section for electronic access to the draft guidance document. Submit...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
... solar, wind and geothermal testing and development in a renewable energy evaluation area located near... pending geothermal lease application within the renewable energy evaluation area. This CDCA Draft Plan... Availability of the Draft Environmental Impact Statement for the West Chocolate Mountains Renewable Energy...
46 CFR 131.510 - Draft and loadline markings.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Draft and loadline markings. 131.510 Section 131.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS OPERATIONS Tests, Drills, and Inspections § 131.510 Draft and loadline markings. (a) The master of each vessel on an ocean...
46 CFR 131.510 - Draft and loadline markings.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Draft and loadline markings. 131.510 Section 131.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS OPERATIONS Tests, Drills, and Inspections § 131.510 Draft and loadline markings. (a) The master of each vessel on an ocean...
Swales, Henry; Banko, Richard; Coakley, David
2015-06-03
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Test Rig Drawings and Bill of Materials. This submission contains information on the equipment for the scaled model tow tank testing. The information includes hardware, test protocols, and plans.
49 CFR 178.255-12 - Pressure test.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Pressure test. 178.255-12 Section 178.255-12... Portable Tanks § 178.255-12 Pressure test. (a) Each completed portable tank prior to application of lining... the test, and applying a pressure of 60 psig. The tank shall be capable of holding the prescribed...
49 CFR 179.200-22 - Test of tanks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... evidence of distress. All rivets and closures, except safety relief valves or safety vents, shall be in place when test is made. (b) Insulated tanks shall be tested before insulation is applied. (c) Rubber-lined tanks shall be tested before rubber lining is applied. (d) Caulking of welded joints to stop leaks...
49 CFR 179.200-22 - Test of tanks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... evidence of distress. All rivets and closures, except safety relief valves or safety vents, shall be in place when test is made. (b) Insulated tanks shall be tested before insulation is applied. (c) Rubber-lined tanks shall be tested before rubber lining is applied. (d) Caulking of welded joints to stop leaks...
49 CFR 179.200-22 - Test of tanks.
Code of Federal Regulations, 2014 CFR
2014-10-01
... evidence of distress. All rivets and closures, except safety relief valves or safety vents, shall be in place when test is made. (b) Insulated tanks shall be tested before insulation is applied. (c) Rubber-lined tanks shall be tested before rubber lining is applied. (d) Caulking of welded joints to stop leaks...
49 CFR 179.200-22 - Test of tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... evidence of distress. All rivets and closures, except safety relief valves or safety vents, shall be in place when test is made. (b) Insulated tanks shall be tested before insulation is applied. (c) Rubber-lined tanks shall be tested before rubber lining is applied. (d) Caulking of welded joints to stop leaks...
Main Propulsion Test Article (MPTA)
NASA Technical Reports Server (NTRS)
Snoddy, Cynthia
2010-01-01
Scope: The Main Propulsion Test Article integrated the main propulsion subsystem with the clustered Space Shuttle Main Engines, the External Tank and associated GSE. The test program consisted of cryogenic tanking tests and short- and long duration static firings including gimbaling and throttling. The test program was conducted on the S1-C test stand (Position B-2) at the National Space Technology Laboratories (NSTL)/Stennis Space Center. 3 tanking tests and 20 hot fire tests conducted between December 21 1 1977 and December 17, 1980 Configuration: The main propulsion test article consisted of the three space shuttle main engines, flightweight external tank, flightweight aft fuselage, interface section and a boilerplate mid/fwd fuselage truss structure.
49 CFR 195.307 - Pressure testing aboveground breakout tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... aboveground breakout tanks. (a) For aboveground breakout tanks built into API Specification 12F and first placed in service after October 2, 2000, pneumatic testing must be in accordance with section 5.3 of API Specification 12 F (incorporated by reference, see § 195.3). (b) For aboveground breakout tanks built to API...
49 CFR 195.307 - Pressure testing aboveground breakout tanks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... aboveground breakout tanks. (a) For aboveground breakout tanks built into API Specification 12F and first placed in service after October 2, 2000, pneumatic testing must be in accordance with section 5.3 of API Specification 12 F (incorporated by reference, see § 195.3). (b) For aboveground breakout tanks built to API...
49 CFR 195.307 - Pressure testing aboveground breakout tanks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... aboveground breakout tanks. (a) For aboveground breakout tanks built into API Specification 12F and first placed in service after October 2, 2000, pneumatic testing must be in accordance with section 5.3 of API Specification 12 F (incorporated by reference, see § 195.3). (b) For aboveground breakout tanks built to API...
49 CFR 195.307 - Pressure testing aboveground breakout tanks.
Code of Federal Regulations, 2014 CFR
2014-10-01
... aboveground breakout tanks. (a) For aboveground breakout tanks built into API Specification 12F and first placed in service after October 2, 2000, pneumatic testing must be in accordance with section 5.3 of API Specification 12 F (incorporated by reference, see § 195.3). (b) For aboveground breakout tanks built to API...
2007-12-21
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a United Space Alliance technician carefully cuts away the foam insulation surrounding the covers over the feed-through connector box on the external tank for space shuttle Atlantis' STS-122 mission. The covers will be removed for access to the feed-through connectors. Following the failure of some of the tank's engine cutoff sensors, or ECO sensors, during propellant tanking for launch attempts on Dec. 6 and Dec. 9, a tanking test was conducted on Dec. 18 to aid in troubleshooting the cause. Technicians spliced test wiring into the ECO sensor electrical system and used time domain reflectometry equipment to help locate the electrical anomaly. Results of the tanking test pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. During the holiday period, workers from Lockheed Martin will begin inspecting and testing the connector. Shuttle program managers will meet on Dec. 27 to review the test and analysis, and decide on a forward plan. Photo credit: NASA/Kim Shiflett
NASA Technical Reports Server (NTRS)
Lovrich, T. N.; Schwartz, S. H.
1975-01-01
The dimensionless parameters associated with the thermal stratification and pressure history of a heated container of liquid and its vapor were examined. The Modified Grashof number, the Fourier number, and an Interface number were parameterized using a single test liquid, Freon 113. Cylindrical test tanks with spherical dome end caps were built. Blanket heaters covered the tanks and thermocouples monitored the temperatures of the liquid, the ullage, the tank walls, and the foam insulation encapsulating the tank. A centrifuge was used for the 6 inch tank to preserve the same scaling parameter values between it and the larger tanks. Tests were conducted over a range of Gr* values and the degree of scaling was checked by comparing the dimensionless pressures and temperatures for each scaled pair of tests. Results indicate that the bulk liquid temperature, the surface temperature of the liquid, and the tank pressure can be scaled with the three dimensionless parameters. Some deviation was, however, found in the detailed temperature profiles between the scaled pairs of tests.
2011-07-25
Stennis Space Center employees marked another construction milestone July 25 with installation of the 85,000-gallon liquid hydrogen tank atop the A-3 Test Stand. The 300-foot-tall stand is being built to test next-generation rocket engines that could carry humans into deep space once more. The liquid hydrogen tank and a 35,000-gallon liquid oxygen tank installed atop the steel structure earlier in June will provide fuel propellants for testing the engines.
14 CFR 25.965 - Fuel tank tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel tank tests. 25.965 Section 25.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.965 Fuel tank tests. (a) It must be...
14 CFR 25.965 - Fuel tank tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank tests. 25.965 Section 25.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.965 Fuel tank tests. (a) It must be...
14 CFR 25.965 - Fuel tank tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel tank tests. 25.965 Section 25.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.965 Fuel tank tests. (a) It must be...
14 CFR 25.965 - Fuel tank tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel tank tests. 25.965 Section 25.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.965 Fuel tank tests. (a) It must be...
14 CFR 25.965 - Fuel tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel tank tests. 25.965 Section 25.965 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.965 Fuel tank tests. (a) It must be...
49 CFR 179.400-21 - Test of pressure relief valves.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Test of pressure relief valves. 179.400-21 Section... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.400-21 Test of pressure relief valves. Each valve must be tested with air or gas for...
49 CFR 179.500-16 - Tests of pressure relief devices.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Tests of pressure relief devices. 179.500-16... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be tested by air...
49 CFR 179.500-16 - Tests of pressure relief devices.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Tests of pressure relief devices. 179.500-16... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be tested by air...
49 CFR 179.500-16 - Tests of pressure relief devices.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Tests of pressure relief devices. 179.500-16... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be tested by air...
49 CFR 179.500-16 - Tests of pressure relief devices.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Tests of pressure relief devices. 179.500-16... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be tested by air...
Fuel tank integrity research : fuel tank analyses and test plans
DOT National Transportation Integrated Search
2013-04-15
The Federal Railroad Administrations Office of Research : and Development is conducting research into fuel tank : crashworthiness. Fuel tank research is being performed to : determine strategies for increasing the fuel tank impact : resistance to ...
Performance testing of radiobioassay laboratories: In vivo measurements, Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacLellan, J.A.; Traub, R.J.; Olsen, P.C.
1990-04-01
A study of two rounds of in vivo laboratory performance testing was undertaken by Pacific Northwest Laboratory (PNL) to determine the appropriateness of the in vivo performance criteria of draft American National Standards Institute (ANSI) standard ANSI N13.3, Performance Criteria for Bioassay.'' The draft standard provides guidance to in vivo counting facilities regarding the sensitivity, precision, and accuracy of measurements for certain categories of commonly assayed radionuclides and critical regions of the body. This report concludes the testing program by presenting the results of the Round Two testing. Testing involved two types of measurements: chest counting for radionuclide detection inmore » the lung, and whole body counting for detection of uniformly distributed material. Each type of measurement was further divided into radionuclide categories as defined in the draft standard. The appropriateness of the draft standard criteria by measuring a laboratory's ability to attain them were judged by the results of both round One and Round Two testing. The testing determined that performance criteria are set at attainable levels, and the majority of in vivo monitoring facilities passed the criteria when complete results were submitted. 18 refs., 18 figs., 15 tabs.« less
49 CFR 179.200-23 - Tests of pressure relief valves.
Code of Federal Regulations, 2013 CFR
2013-10-01
... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-23 Tests of...
49 CFR 179.200-23 - Tests of pressure relief valves.
Code of Federal Regulations, 2012 CFR
2012-10-01
... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-23 Tests of...
49 CFR 179.200-23 - Tests of pressure relief valves.
Code of Federal Regulations, 2014 CFR
2014-10-01
... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-23 Tests of...
Results of a conventional fuel tank blunt impact test
DOT National Transportation Integrated Search
2015-03-23
The Federal Railroad Administrations Office of Research : and Development is conducting research into passenger : locomotive fuel tank crashworthiness. A series of impact tests is : being conducted to measure fuel tank deformation under two : type...
40 CFR 86.131-96 - Vehicle preparation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Heavy-Duty Vehicles; Test Procedures § 86.131-96 Vehicle preparation. (a) For gasoline- and methanol-fueled vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be...
40 CFR 86.131-96 - Vehicle preparation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Heavy-Duty Vehicles; Test Procedures § 86.131-96 Vehicle preparation. (a) For gasoline- and methanol-fueled vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be...
40 CFR 86.1231-96 - Vehicle preparation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as described... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be... Emission Test Procedures for New Gasoline-Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas-Fueled and...
40 CFR 86.1231-96 - Vehicle preparation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as described... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be... Emission Test Procedures for New Gasoline-Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas-Fueled and...
40 CFR 86.131-96 - Vehicle preparation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Heavy-Duty Vehicles; Test Procedures § 86.131-96 Vehicle preparation. (a) For gasoline- and methanol-fueled vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be...
40 CFR 86.131-96 - Vehicle preparation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Heavy-Duty Vehicles; Test Procedures § 86.131-96 Vehicle preparation. (a) For gasoline- and methanol-fueled vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be...
40 CFR 86.1231-96 - Vehicle preparation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as described... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be... Emission Test Procedures for New Gasoline-Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas-Fueled and...
40 CFR 86.1231-96 - Vehicle preparation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as described... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be... Emission Test Procedures for New Gasoline-Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas-Fueled and...
40 CFR 86.131-96 - Vehicle preparation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Heavy-Duty Vehicles; Test Procedures § 86.131-96 Vehicle preparation. (a) For gasoline- and methanol-fueled vehicles prepare the fuel tank(s) for recording the temperature of the prescribed test fuel, as... optional during the running loss test. If vapor temperature is not measured, fuel tank pressure need not be...
Learning to Read and Write the Drafting Way. Field Test Copy.
ERIC Educational Resources Information Center
California State Dept. of Education, Sacramento. Div. of Vocational Education.
This volume comprises instructional techniques that are designed for use with drafting students who demonstrate a need for additional instruction in the areas of reading, writing, math, and verbal and visual communication. Included in the guide are the following teacher-developed instructional techniques: a drafting crossword puzzle, tool bingo, a…
Fukui, Yoshihiro; Ema, Makoto; Fujiwara, Michio; Higuchi, Hashihiro; Inouye, Minoru; Iwase, Takayuki; Kihara, Takahide; Nishimura, Tatsuya; Oi, Akihide; Ooshima, Yojiro; Otani, Hiroki; Shinomiya, Mitsuhiro; Sugioka, Kozo; Yamano, Tsunekazu; Yamashita, Keisuke H; Tanimura, Takashi
2004-09-01
In September 2003, a new revision of the draft guideline (Organization for Economic Co-operation and Development [OECD] Guideline for the Testing of Chemicals, Proposal for a New Guideline 426, Developmental Neurotoxicity Study) was distributed. The draft guideline consists of 51 paragraphs and an appendix. The National Coordinators were requested to arrange national expert reviews of the guideline proposal in their member countries. The member of the Behavioral Teratology (BT) Committee of the Japanese Teratology Society (JTS) reviewed, discussed and commented on the draft Test Guideline proposal. The BT Committee of the JTS also commented that the International Collaborative Study to validate this protocol should be definitely performed. These comments were sent to the OECD Secretariat. The BT Committee of the JTS expects that the comments are useful for further discussion.
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, William D.; Hay, Michael S.
Solubility testing with actual High Level Waste tank sludge has been conducted in order to evaluate several alternative chemical cleaning technologies for the dissolution of sludge residuals remaining in the tanks after the exhaustion of mechanical cleaning and sludge sluicing efforts. Tests were conducted with archived Savannah River Site (SRS) radioactive sludge solids that had been retrieved from Tank 5F in order to determine the effectiveness of an optimized, dilute oxalic/nitric acid cleaning reagent toward dissolving the bulk non-radioactive waste components. Solubility tests were performed by direct sludge contact with the oxalic/nitric acid reagent and with sludge that had beenmore » pretreated and acidified with dilute nitric acid. For comparison purposes, separate samples were also contacted with pure, concentrated oxalic acid following current baseline tank chemical cleaning methods. One goal of testing with the optimized reagent was to compare the total amounts of oxalic acid and water required for sludge dissolution using the baseline and optimized cleaning methods. A second objective was to compare the two methods with regard to the dissolution of actinide species known to be drivers for SRS tank closure Performance Assessments (PA). Additionally, solubility tests were conducted with Tank 5 sludge using acidic and caustic permanganate-based methods focused on the “targeted” dissolution of actinide species.« less
Septic tank additive impacts on microbial populations.
Pradhan, S; Hoover, M T; Clark, G H; Gumpertz, M; Wollum, A G; Cobb, C; Strock, J
2008-01-01
Environmental health specialists, other onsite wastewater professionals, scientists, and homeowners have questioned the effectiveness of septic tank additives. This paper describes an independent, third-party, field scale, research study of the effects of three liquid bacterial septic tank additives and a control (no additive) on septic tank microbial populations. Microbial populations were measured quarterly in a field study for 12 months in 48 full-size, functioning septic tanks. Bacterial populations in the 48 septic tanks were statistically analyzed with a mixed linear model. Additive effects were assessed for three septic tank maintenance levels (low, intermediate, and high). Dunnett's t-test for tank bacteria (alpha = .05) indicated that none of the treatments were significantly different, overall, from the control at the statistical level tested. In addition, the additives had no significant effects on septic tank bacterial populations at any of the septic tank maintenance levels. Additional controlled, field-based research iswarranted, however, to address additional additives and experimental conditions.
Filament-wound, fiberglass cryogenic tank supports
NASA Technical Reports Server (NTRS)
Carter, J. S.; Timberlake, T. E.
1971-01-01
The design, fabrication, and testing of filament-wound, fiberglass cryogenic tank supports for a LH2 tank, a LF2/FLOX tank and a CH4 tank. These supports consist of filament-wound fiberglass tubes with titanium end fittings. These units were satisfactorily tested at cryogenic temperatures, thereby offering a design that can be reliably and economically produced in large or small quantities. The basic design concept is applicable to any situation where strong, lightweight axial load members are desired.
NASA Technical Reports Server (NTRS)
Chato, David J.
1991-01-01
The results are presented of a series of no-vent fill experiments conducted on a 175 cu ft flightweight hydrogen tank. The experiments consisted of the nonvented fill of the tankage with liquid hydrogen using two different inlet systems (top spray, and bottom spray) at different tank initial conditions and inflow rates. Nine tests were completed of which six filled in excess of 94 percent. The experiments demonstrated a consistent and repeatable ability to fill the tank in excess of 94 percent using the nonvented fill technique. Ninety-four percent was established as the high level cutoff due to requirements for some tank ullage to prevent rapid tank pressure rise which occurs in a tank filled entirely with liquid. The best fill was terminated at 94 percent full with a tank internal pressure less than 26 psia. Although the baseline initial tank wall temperature criteria was that all portions of the tank wall be less than 40 R, fills were achieved with initial wall temperatures as high as 227 R.
NASA Technical Reports Server (NTRS)
Fox, E. C.; Kiefel, E. R.; Mcintosh, G. L.; Sharpe, J. B.; Sheahan, D. R.; Wakefield, M. E.
1993-01-01
The development of a test bed tank and system for evaluating cryogenic fluid management technologies in a simulated upper stage liquid hydrogen tank is covered. The tank is 10 ft long and is 10 ft in diameter, and is an ASME certified tank constructed of 5083 aluminum. The tank is insulated with a combination of sprayed on foam insulation, covered by 45 layers of double aluminized mylar separated by dacron net. The mylar is applied by a continuous wrap system adapted from commercial applications, and incorporates variable spacing between the mylar to provide more space between those layers having a high delta temperature, which minimizes heat leak. It also incorporates a unique venting system which uses fewer large holes in the mylar rather than the multitude of small holes used conventionally. This significantly reduces radiation heat transfer. The test bed consists of an existing vacuum chamber at MSFC, the test bed tank and its thermal control system, and a thermal shroud (which may be heated) surrounding the tank. Provisions are made in the tank and chamber for inclusion of a variety of cryogenic fluid management experiments.
NASA Technical Reports Server (NTRS)
Healy, Frederick M.
1958-01-01
A supplementary investigation to determine the effect of external fuel tanks on the spin and recovery characteristics of a l/28-scale model of the North American FJ-4 airplane has been conducted in the Langley 20-foot free-spinning tunnel. The model had been extensively tested previously (NACA Research Memorandum SL38A29) and therefore only brief tests were made to evaluate the effect of tank installation. Erect spin tests of the model indicate that flat-type spins-are more prevalent with 200-gallon external fuel tanks than with tanks not installed. The recovery technique determined for spins without tanks, rudder reversal to full against the spin accompanied by simultaneous movement of ailerons to full with the spin, is recommended for spins encountered with external tanks installed. If inverted spins are encountered with external tanks installed, the tanks should be jettisoned and recovery attempted by rudder reversal to full against the spin with ailerons maintained at neutral.
STS-133/ET-137 Tanking Test Photogrammetry Assessment
NASA Technical Reports Server (NTRS)
Oliver, Stanley T.
2012-01-01
Following the launch scrub of Space Shuttle mission STS-133 on November 5, 2010, an anomalous condition of cracked and raised thermal protection system (TPS) foam was observed on the External Tank (ET). Subsequent dissection of the affected TPS region revealed cracks in the feet of two Intertank (IT) metallic stringers. An extensive investigation into the cause(s) and corrective action(s) for the cracked stringers was initiated, involving a wide array of material and structural tests and nondestructive evaluations, with the intent to culminate into the development of flight rational. One such structural test was the instrumented tanking test performed on December 17, 2010. The tanking test incorporated two three-dimensional optical displacement measurement systems to measure full-field outer surface displacements of the TPS surrounding the affected region that contained the stringer cracks. The results showed that the radial displacement and rotation of the liquid oxygen (LO2) tank flange changed significantly as the fluid level of the LO2 approached and passed the LO2 tank flange.
NASA Technical Reports Server (NTRS)
Perez, Jose G.; Parks, Russel, A.; Lazor, Daniel R.
2012-01-01
The slosh dynamics of propellant tanks can be represented by an equivalent mass-pendulum-dashpot mechanical model. The parameters of this equivalent model, identified as slosh mechanical model parameters, are slosh frequency, slosh mass, and pendulum hinge point location. They can be obtained by both analysis and testing for discrete fill levels. Anti-slosh baffles are usually needed in propellant tanks to control the movement of the fluid inside the tank. Lateral slosh testing, involving both random excitation testing and free-decay testing, are performed to validate the slosh mechanical model parameters and the damping added to the fluid by the anti-slosh baffles. Traditional modal analysis procedures were used to extract the parameters from the experimental data. Test setup of sub-scale tanks will be described. A comparison between experimental results and analysis will be presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
BROWN MH
2008-11-13
Laboratory testing was performed to develop a comprehensive understanding of the corrosivity of the tank wastes stored in Double-Shell Tanks using simulants primarily from Tanks 241-AP-105, 241-SY-103 and 241-AW-105. Additional tests were conducted using simulants of the waste stored in 241-AZ-102, 241-SY-101, 241-AN-107, and 241-AY-101. This test program placed particular emphasis on defining the range of tank waste chemistries that do not induce the onset of localized forms of corrosion, particularly pitting and stress corrosion cracking. This document summarizes the key findings of the research program.
Cryogenic Pressure Control Modeling for Ellipsoidal Space Tanks
NASA Technical Reports Server (NTRS)
Lopez, Alfredo; Grayson, Gary D.; Chandler, Frank O.; Hastings, Leon J.; Heyadat, Ali
2007-01-01
A computational fluid dynamics (CFD) model is developed to simulate pressure control of an ellipsoidal-shaped liquid hydrogen tank under external heating in normal gravity. Pressure control is provided by an axial jet thermodynamic vent system (TVS) centered within the vessel that injects cooler liquid into the tank, mixing the contents and reducing tank pressure. The two-phase cryogenic tank model considers liquid hydrogen in its own vapor with liquid density varying with temperature only and a fully compressible ullage. The axisymmetric model is developed using a custom version of the commercially available FLOW-31) software. Quantitative model validation is ,provided by engineering checkout tests performed at Marshall Space Flight Center in 1999 in support of the Solar Thermal Upper Stage_ Technology Demonstrator (STUSTD) program. The engineering checkout tests provide cryogenic tank self-pressurization test data at various heat leaks and tank fill levels. The predicted self-pressurization rates, ullage and liquid temperatures at discrete locations within the STUSTD tank are in good agreement with test data. The work presented here advances current CFD modeling capabilities for cryogenic pressure control and helps develop a low cost CFD-based design process for space hardware.
49 CFR 179.220-24 - Tests of pressure relief valves.
Code of Federal Regulations, 2012 CFR
2012-10-01
... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-24 Tests of pressure relief valves. Each safety relief valve must be tested by air or gas for compliance with § 179.15...
49 CFR 179.220-24 - Tests of pressure relief valves.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-24 Tests of pressure relief valves. Each safety relief valve must be tested by air or gas for compliance with § 179.15...
49 CFR 178.348-5 - Pressure and leakage test.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PACKAGINGS Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure....5 times tank MAWP, and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12...
Self pressuring HTP feed systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whitehead, J.
1999-10-14
Hydrogen peroxide tanks can be pressurized with decomposed HTP (high test hydrogen peroxide) originating in the tank itself. In rocketry, this offers the advantage of eliminating bulky and heavy inert gas storage. Several prototype self-pressurizing HTP systems have recently been designed and tested. Both a differential piston tank and a small gas-driven pump have been tried to obtain the pressure boost needed for flow through a gas generator and back to the tank. Results include terrestrial maneuvering tests of a prototype microsatellite, including warm gas attitude control jets.
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.
Results of a diesel multiple unit fuel tank blunt impact test
DOT National Transportation Integrated Search
2017-04-04
The Federal Railroad Administrations Office of Research and Development is conducting research into passenger locomotive fuel tank crashworthiness. A series of impact tests is being conducted to measure fuel tank deformation under two types of dyn...
76 FR 16425 - Draft Guidance for Industry: Testing for Salmonella
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... draft guidance does not apply to egg producers and other persons who are covered by FDA's final rule ``Prevention of Salmonella Enteritidis in Shell Eggs During Production, Storage, and Transportation.'' The... eggs) and direct-human-contact animal foods, and the interpretation of test results, when the presence...
The Structural Heat Intercept-Insulation-Vibration Evaluation Rig (SHIVER)
NASA Technical Reports Server (NTRS)
Johnson, W. L.; Zoeckler, J. G.; Best-Ameen, L. M.
2015-01-01
NASA is currently investigating methods to reduce the boil-off rate on large cryogenic upper stages. Two such methods to reduce the total heat load on existing upper stages are vapor cooling of the cryogenic tank support structure and integration of thick multilayer insulation systems to the upper stage of a launch vehicle. Previous efforts have flown a 2-layer MLI blanket and shown an improved thermal performance, and other efforts have ground-tested blankets up to 70 layers thick on tanks with diameters between 2 3 meters. However, thick multilayer insulation installation and testing in both thermal and structural modes has not been completed on a large scale tank. Similarly, multiple vapor cooled shields are common place on science payload helium dewars; however, minimal effort has gone into intercepting heat on large structural surfaces associated with rocket stages. A majority of the vapor cooling effort focuses on metallic cylinders called skirts, which are the most common structural components for launch vehicles. In order to provide test data for comparison with analytical models, a representative test tank is currently being designed to include skirt structural systems with integral vapor cooling. The tank is 4 m in diameter and 6.8 m tall to contain 5000 kg of liquid hydrogen. A multilayer insulation system will be designed to insulate the tank and structure while being installed in a representative manner that can be extended to tanks up to 10 meters in diameter. In order to prove that the insulation system and vapor cooling attachment methods are structurally sound, acoustic testing will also be performed on the system. The test tank with insulation and vapor cooled shield installed will be tested thermally in the B2 test facility at NASAs Plumbrook Station both before and after being vibration tested at Plumbrooks Space Power Facility.
2007-12-21
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a United Space Alliance technician carefully cuts away the foam insulation surrounding the covers over the feed-through connector box on the external tank for space shuttle Atlantis' STS-122 mission, revealing the fastener holes on the covers. The covers will be removed for access to the feed-through connectors. Following the failure of some of the tank's engine cutoff sensors, or ECO sensors, during propellant tanking for launch attempts on Dec. 6 and Dec. 9, a tanking test was conducted on Dec. 18 to aid in troubleshooting the cause. Technicians spliced test wiring into the ECO sensor electrical system and used time domain reflectometry equipment to help locate the electrical anomaly. Results of the tanking test pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. During the holiday period, workers from Lockheed Martin will begin inspecting and testing the connector. Shuttle program managers will meet on Dec. 27 to review the test and analysis, and decide on a forward plan. Photo credit: NASA/Kim Shiflett
2007-12-21
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a United Space Alliance technician carefully cuts away the foam insulation surrounding the covers over the feed-through connector box on the external tank for space shuttle Atlantis' STS-122 mission, revealing the fastener holes on the covers. The covers will be removed for access to the feed-through connectors. Following the failure of some of the tank's engine cutoff sensors, or ECO sensors, during propellant tanking for launch attempts on Dec. 6 and Dec. 9, a tanking test was conducted on Dec. 18 to aid in troubleshooting the cause. Technicians spliced test wiring into the ECO sensor electrical system and used time domain reflectometry equipment to help locate the electrical anomaly. Results of the tanking test pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. During the holiday period, workers from Lockheed Martin will begin inspecting and testing the connector. Shuttle program managers will meet on Dec. 27 to review the test and analysis, and decide on a forward plan. Photo credit: NASA/Kim Shiflett
2007-12-21
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a United Space Alliance technician removes foam insulation revealing the fastener holes on the covers over the feed-through connector box on the external tank for space shuttle Atlantis' STS-122 mission. The covers will be removed for access to the feed-through connectors. Following the failure of some of the tank's engine cutoff sensors, or ECO sensors, during propellant tanking for launch attempts on Dec. 6 and Dec. 9, a tanking test was conducted on Dec. 18 to aid in troubleshooting the cause. Technicians spliced test wiring into the ECO sensor electrical system and used time domain reflectometry equipment to help locate the electrical anomaly. Results of the tanking test pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. During the holiday period, workers from Lockheed Martin will begin inspecting and testing the connector. Shuttle program managers will meet on Dec. 27 to review the test and analysis, and decide on a forward plan. Photo credit: NASA/Kim Shiflett
2007-12-21
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, the foam insulation surrounding the covers over the feed-through connector box on the external tank for space shuttle Atlantis' STS-122 mission is carefully cut away by a United Space Alliance technician. The covers will be removed for access to the feed-through connectors. Following the failure of some of the tank's engine cutoff sensors, or ECO sensors, during propellant tanking for launch attempts on Dec. 6 and Dec. 9, a tanking test was conducted on Dec. 18 to aid in troubleshooting the cause. Technicians spliced test wiring into the ECO sensor electrical system and used time domain reflectometry equipment to help locate the electrical anomaly. Results of the tanking test pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. During the holiday period, workers from Lockheed Martin will begin inspecting and testing the connector. Shuttle program managers will meet on Dec. 27 to review the test and analysis, and decide on a forward plan. Photo credit: NASA/Kim Shiflett
Test Results for Caustic Demand Measurements on Tank 241-AX-101 and Tank 241-AX-103 Archive Samples
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doll, Stephanie R.; Bolling, Stacie D.
Caustic demand testing is used to determine the necessary amount of caustic required to neutralize species present in the Hanford tank waste and obtain a target molarity of free hydroxide for tank corrosion control. The presence and quantity of hydroxide-consuming analytes are just as important in determining the caustic demand as is the amount of free hydroxide present. No single data point can accurately predict whether a satisfactory hydroxide level is being met, as it is dependent on multiple factors (e.g., free hydroxide, buffers, amphoteric metal hydroxides, bicarbonate, etc.). This enclosure contains the caustic demand, scanning electron microscopy (SEM), polarizedmore » light microscopy (PLM), and X-ray diffraction (XRD) analysis for the tank 241-AX-101 (AX-101) and 241-AX-103 (AX-103) samples. The work was completed to fulfill a customer request outlined in the test plan, WRPS-1505529, “Test Plan and Procedure for Caustic Demand Testing on Tank 241-AX-101 and Tank 241-AX-103 Archive Samples.” The work results will provide a baseline to support planned retrieval of AX-101 and AX-103.« less
Experimental evaluation of LPG tank explosion hazards.
Stawczyk, Jan
2003-01-31
Liquefied-pressure gases (LPG) are transported and stored in the liquid phase in closed tanks under sufficiently high pressure. In the case of an accident, an abrupt tank unsealing may release enormous quantity of evaporating gas and energy that has a destructive effect on the tank and its surroundings. In this paper, experiments with explosions of small LPG tanks are described. The data acquisition equipment applied in the tests provided a chance to learn dynamics of the process and determine hazard factors. The tests enabled a determination of temperature and pressure at which tanks containing LPG disrupt. The results enable a reconstruction of consecutive phases of the explosion and identification of hazards resulting from damage of the tanks. An explanation of the tank unsealing process with fluid parameters above critical point is given.
A Computer Model of Drafting Effects on Collective Behavior in Elite 10,000-m Runners.
Trenchard, Hugh; Renfree, Andrew; Peters, Derek M
2017-03-01
Drafting in cycling influences collective behavior of pelotons. Although evidence for collective behavior in competitive running events exists, it is not clear if this results from energetic savings conferred by drafting. This study modeled the effects of drafting on behavior in elite 10,000-m runners. Using performance data from a men's elite 10,000-m track running event, computer simulations were constructed using Netlogo 5.1 to test the effects of 3 different drafting quantities on collective behavior: no drafting, drafting to 3 m behind with up to ~8% energy savings (a realistic running draft), and drafting up to 3 m behind with up to 38% energy savings (a realistic cycling draft). Three measures of collective behavior were analyzed in each condition: mean speed, mean group stretch (distance between first- and last-placed runner), and runner-convergence ratio (RCR), which represents the degree of drafting benefit obtained by the follower in a pair of coupled runners. Mean speeds were 6.32 ± 0.28, 5.57 ± 0.18, and 5.51 ± 0.13 m/s in the cycling-draft, runner-draft, and no-draft conditions, respectively (all P < .001). RCR was lower in the cycling-draft condition but did not differ between the other 2. Mean stretch did not differ between conditions. Collective behaviors observed in running events cannot be fully explained through energetic savings conferred by realistic drafting benefits. They may therefore result from other, possibly psychological, processes. The benefits or otherwise of engaging in such behavior are as yet unclear.
AT on Buried LPG Tanks Over 13 m3: An Innovative and Practical Solution
NASA Astrophysics Data System (ADS)
Di Fratta, Crescenzo; Ferraro, Antonio; Tscheliesnig, Peter; Lackner, Gerald; Correggia, Vincenzo; Altamura, Nicola
In Italy, since 2005, techniques based on Acoustic Emission have been introduced for testing of underground LPG tanks up to 13 m3, according to the European standard EN 12818:2004. The testing procedure for these tanks plans to install one or more pairs of sensors inside the "dome" suited for the access to the valves and fittings of the tank, directly on the accessible metal shell. This methodology is not applicable for the underground LPG buried tanks, where it is necessary to install a larger number of AE sensors, in order to cover at 100% the whole tank shell, even at very deep positions. Already in 2004, the European standard EN 12820 (Appendix C - Informative)give the possibility to use Acoustic Emission testing of LPG underground or buried tanks with a capacity exceeding 13 m3, but no technique was specified for the application. In 2008, TÜV AUSTRIA ITALIA - BLU SOLUTIONS srl - Italian company of TÜV AUSTRIA Group - has developed a technique to get access at tank shell, where tank capacity is greater than 13 m3 and its' diameter greater than 3,5 m. This methodology was fully in comply with the provisions of the European Standard EN 12819:2010, becoming an innovative solution widely appreciated and is used in Italy since this time. Currently, large companies and petrochemical plants, at the occurrence of the tank's requalification, have engaged TÜV AUSTRIA ITALIA - BLU SOLUTIONS to install such permanent predispositions, which allow access to the tank shell - test object - with diameters from 4 to 8 m. Through this access, you can install the AE sensors needed to cover at 100% the tank surface and then to perform AE test. In an economic crisis period, this technique is proving a valid and practically applicable answer, in order to reduce inspection costs and downtime by offering a technically advanced solution (AT), increasing the safety of the involved operators, protecting natural resources and the environment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Leakage Tests for Cargo Tanks Transporting Liquefied Compressed Gases B Appendix B to Part 180... Pt. 180, App. B Appendix B to Part 180—Acceptable Internal Self-closing Stop Valve Leakage Tests for.... (b) Internal Self-Closing Stop Valve Test. An operator of a cargo tank that is not equipped with a...
49 CFR 179.400-21 - Test of pressure relief valves.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and...
NASA Astrophysics Data System (ADS)
Stickler, Patrick B.; Keller, Peter C.
1998-01-01
Reusable Launch Vehicles (RLV's) utilizing LOX\\LH2 as the propellant require lightweight durable structural systems to meet mass fraction goals and to reduce overall systems operating costs. Titanium honeycomb sandwich with flexible blanket TPS on the windward surface is potentially the lightest-weight and most operable option. Light weight is achieved in part because the honeycomb sandwich tank provides insulation to its liquid hydrogen contents, with no need for separate cryogenic insulation, and in part because the high use temperature of titanium honeycomb reduces the required surface area of re-entry thermal protection systems. System operability is increased because TPS needs to be applied only to surfaces where temperatures exceed approximately 650 K. In order to demonstrate the viability of a titanium sandwich constructed propellant tank, a technology demonstration program was conducted including the design, fabrication and testing of a propellant tank-TPS system. The tank was tested in controlled as well as ambient environments representing ground hold conditions for a RLV main propellant tank. Data collected during each test run was used to validate predictions for air liquefaction, outside wall temperature, boil-off rates, frost buildup and its insulation effects, and the effects of placing a thermal protection system blanket on the external surface. Test results indicated that titanium honeycomb, when used as a RLV propellant tank material, has great promise as a light-weight structural system.
Thermal stratification in LH2 tank of cryogenic propulsion stage tested in ISRO facility
NASA Astrophysics Data System (ADS)
Xavier, M.; Raj, R. Edwin; Narayanan, V.
2017-02-01
Liquid oxygen and hydrogen are used as oxidizer and fuel respectively in cryogenic propulsion system. These liquids are stored in foam insulated tanks of cryogenic propulsion system and are pressurized using warm pressurant gas supplied for tank pressure maintenance during cryogenic engine operation. Heat leak to cryogenic propellant tank causes buoyancy driven liquid stratification resulting in formation of warm liquid stratum at liquid free surface. This warm stratum is further heated by the admission of warm pressurant gas for tank pressurization during engine operation. Since stratified layer temperature has direct bearing on the cavitation free operation of turbo pumps integrated in cryogenic engine, it is necessary to model the thermal stratification for predicting stratified layer temperature and mass of stratified liquid in tank at the end of engine operation. These inputs are required for estimating the minimum pressure to be maintained by tank pressurization system. This paper describes configuration of cryogenic stage for ground qualification test, stage hot test sequence, a thermal model and its results for a foam insulated LH2 tank subjected to heat leak and pressurization with hydrogen gas at 200 K during liquid outflow at 38 lps for engine operation. The above model considers buoyancy flow in free convection boundary layer caused by heat flux from tank wall and energy transfer from warm pressurant gas etc. to predict temperature of liquid stratum and mass of stratified liquid in tank at the end of engine operation in stage qualification tests carried out in ISRO facility.
Test Report for Permanganate and Cold Strontium Strike for Tank 241-AN-102
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duncan, James B.; Huber, Heinz J.; Smalley, Colleen S.
Tanks 241-AN-102 and 241-AN-107 supernatants contain soluble Sr-90 and transuranic elements that require removal prior to vitrification to comply with the Waste Treatment and Immobilization Plant immobilized low-activity waste specification (WTP Contract, DE-AC27-01RV 14136, Specification 2.2.2.8, "Radionuclide Concentration Limitations") and the U.S. Nuclear Regulatory Commission provisional agreement on waste incidental to reprocessing (letter, Paperiello, C. J., "Classification of Hanford Low-Activity Tank Waste Fraction"). These two tanks have high concentrations of organics and organic complexants and are referred to as complexant concentrate tanks. A precipitation process using sodium permanganate (NaMnO{sub 4}) and strontium nitrate (Sr(NO{sub 3}){sub 2}) was developed and testedmore » with tank waste samples to precipitate Sr-90 and transuranic elements from the supernate (PNWD-3141, Optimization of Sr/TRU Removal Conditions with Samples of AN-102 Tank Waste). Testing documented in this report was conducted to further evaluate the use of the strontium nitrate/sodium permanganate process in tank farms with a retention time of up to 12 months. Previous testing was focused on developing a process for deployment in the ultrafiltration vessels in the Waste Treatment and Immobilization Plant. This environment is different from tank farms in two important ways: the waste is diluted in the Waste Treatment and Immobilization Plant to ~5.5 M sodium, whereas the supernate in the tank farms is ~9 M Na. Secondly, while the Waste Treatment and Immobilization Plant allows for a maximum treatment time of hours to days, the in-tank farms treatment of tanks 241-AN102 and 241-AN-107 will result in a retention time of months (perhaps up to12 months) before processing. A comparative compilation of separation processes for Sr/transuranics has been published as RPP-RPT-48340, Evaluation of Alternative Strontium and Transuranic Separation Processes. This report also listed the testing needs for the permanganate precipitation process to be field-deployable. A more comprehensive listing of future testing needs to allow the process to be field deployable are contained in RPP-PLAN-51288, Development Test Plan for Sr/TRU Precipitation Process.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
...The Food and Drug Administration (FDA) is announcing the availability of a draft document entitled ``Guidance for Industry: Use of Donor Screening Tests to Test Donors of Human Cells, Tissues, and Cellular and Tissue-Based Products (HCT/Ps) for Infection with Treponema pallidum (Syphilis),'' dated October 2013. The draft guidance document provides establishments that make donor eligibility determinations for donors of HCT/Ps (HCT/P Establishments), with updated recommendations concerning donor testing for evidence of Treponema pallidum (T. pallidum) infection, the etiologic agent of syphilis. HCT/P Establishments must, as required under Federal regulations, test a donor specimen for evidence of T. pallidum infection using appropriate FDA-licensed, approved, or cleared donor screening tests, in accordance with the manufacturer's instructions, unless an exception to this requirement applies. The draft guidance clarifies that FDA does not consider diagnostic tests or pre-amendment devices (which have not been licensed, approved, or cleared) to be adequate for use in donor testing for T. pallidum infection under the criteria specified in Federal regulations. The recommendations in this guidance, when finalized, will supersede those recommendations for testing HCT/P donors for evidence of T. pallidum infection contained in the document entitled ``Guidance for Industry: Eligibility Determination for Donors of Human Cells, Tissues, and Cellular and Tissue-Based Products (HCT/Ps),'' dated August 2007.
40 CFR 86.232-94 - Vehicle preconditioning.
Code of Federal Regulations, 2012 CFR
2012-07-01
... vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be filled to approximately the prescribed “tank fuel volume” with the test fuel specified § 86.213... existing fuel must be drained prior to the fuel fill. The test fuel shall be at a temperature less than or...
40 CFR 86.232-94 - Vehicle preconditioning.
Code of Federal Regulations, 2013 CFR
2013-07-01
... vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be filled to approximately the prescribed “tank fuel volume” with the test fuel specified § 86.213... existing fuel must be drained prior to the fuel fill. The test fuel shall be at a temperature less than or...
40 CFR 86.232-94 - Vehicle preconditioning.
Code of Federal Regulations, 2010 CFR
2010-07-01
... vehicle shall be moved to the test area and the following operations performed: (1) The fuel tank(s) shall be filled to approximately the prescribed “tank fuel volume” with the test fuel specified § 86.213... existing fuel must be drained prior to the fuel fill. The test fuel shall be at a temperature less than or...
Credit WCT. Photographic copy of photograph, oxidizer and fuel tank ...
Credit WCT. Photographic copy of photograph, oxidizer and fuel tank assembly for engine tests being raised by crane for permanent installation in Test Stand "D" tower. Each tank held 170 gallons of propellants. (JPL negative 384-2029-B, 7 August 1959) - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Acceptable Internal Self-closing Stop Valve Leakage Tests for Cargo Tanks Transporting Liquefied Compressed Gases B Appendix B to Part 180... Leakage Tests for Cargo Tanks Transporting Liquefied Compressed Gases For internal self-closing stop valve...
Additional experiments on flowability improvements of aviation fuels at low temperatures, volume 2
NASA Technical Reports Server (NTRS)
Stockemer, F. J.; Deane, R. L.
1982-01-01
An investigation was performed to study flow improver additives and scale-model fuel heating systems for use with aviation hydrocarbon fuel at low temperatures. Test were performed in a facility that simulated the heat transfer and temperature profiles anticipated in wing fuel tanks during flight of long-range commercial aircraft. The results are presented of experiments conducted in a test tank simulating a section of an outer wing integral fuel tank approximately full-scale in height, chilled through heat exchange panels bonded to the upper and lower horizontal surfaces. A separate system heated lubricating oil externally by a controllable electric heater, to transfer heat to fuel pumped from the test tank through an oil-to-fuel heat exchanger, and to recirculate the heated fuel back to the test tank.
The Development of Statistics Textbook Supported with ICT and Portfolio-Based Assessment
NASA Astrophysics Data System (ADS)
Hendikawati, Putriaji; Yuni Arini, Florentina
2016-02-01
This research was development research that aimed to develop and produce a Statistics textbook model that supported with information and communication technology (ICT) and Portfolio-Based Assessment. This book was designed for students of mathematics at the college to improve students’ ability in mathematical connection and communication. There were three stages in this research i.e. define, design, and develop. The textbooks consisted of 10 chapters which each chapter contains introduction, core materials and include examples and exercises. The textbook developed phase begins with the early stages of designed the book (draft 1) which then validated by experts. Revision of draft 1 produced draft 2 which then limited test for readability test book. Furthermore, revision of draft 2 produced textbook draft 3 which simulated on a small sample to produce a valid model textbook. The data were analysed with descriptive statistics. The analysis showed that the Statistics textbook model that supported with ICT and Portfolio-Based Assessment valid and fill up the criteria of practicality.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Department of Transportation (U.S. DOT) pressure test requirements of 49 CFR part 180 for cargo tanks and 49 CFR 173.31 for tank cars. (iii) Organic liquids must only be unloaded from cargo tanks or tank cars... pressure relief device on the storage tank, or on the cargo tank or tank car, shall open during loading or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Department of Transportation (U.S. DOT) pressure test requirements of 49 CFR part 180 for cargo tanks and 49 CFR 173.31 for tank cars. (iii) Organic liquids must only be unloaded from cargo tanks or tank cars... pressure relief device on the storage tank, or on the cargo tank or tank car, shall open during loading or...
Liquid Nitrogen Zero Boiloff Testing
NASA Technical Reports Server (NTRS)
Plachta, David; Feller, Jeffrey; Johnson, Wesley; Robinson, Craig
2017-01-01
Cryogenic propellants such as liquid hydrogen (LH2) and liquid oxygen (LO2) are a part of NASAs future space exploration due to their high specific impulse for rocket motors of upper stages suitable for transporting 10s to 100s of metric tons of payload mass to destinations outside of low earth orbit and for their return. However, the low storage temperatures of LH2 and LO2 cause substantial boil-off losses for missions with durations greater than several months. These losses can be eliminated by incorporating high performance cryocooler technology to intercept heat load to the propellant tanks and modulating the cryocooler to control tank pressure. The active thermal control technology being developed by NASA is the reverse turbo-Brayton cycle cryocooler and its integration to the propellant tank through a distributed cooling tubing network coupled to the tank wall. This configuration was recently tested at NASA Glenn Research Center, in a vacuum chamber and cryo-shroud that simulated the essential thermal aspects of low Earth orbit, its vacuum and temperature. Testing consisted of three passive tests with the active cryo-cooler system off, and 7 active tests, with the cryocooler powered up. The test matrix included zero boil-off tests performed at 90 full and 25 full, and several demonstrations at excess cooling capacity and reduced cooling capacity. From this, the tank pressure response with varied cryocooler power inputs was determined. This test series established that the active cooling system integrated with the propellant tank eliminated boil-off and robustly controlled tank pressure.
NASA Technical Reports Server (NTRS)
Plachta, David W.; Johnson, Wesley L.; Feller, Jeffrey R.
2015-01-01
Cryogenic propellants such as liquid hydrogen (LH2) and liquid oxygen (LO2) are a part of NASA's future space exploration due to their high specific impulse for rocket motors of upper stages suitable for transporting 10s to 100s of metric tons of payload mass to destinations outside of low earth orbit and for their return. However, the low storage temperatures of LH2 and LO2 cause substantial boil-off losses for missions with durations greater than several months. These losses can be eliminated by incorporating high performance cryocooler technology to intercept heat load to the propellant tanks and modulating the cryocooler to control tank pressure. The active thermal control technology being developed by NASA is the reverse turbo-Brayton cycle cryocooler and its integration to the propellant tank through a distributed cooling tubing network coupled to the tank wall. This configuration was recently tested at NASA Glenn Research Center, in a vacuum chamber and cryoshroud that simulated the essential thermal aspects of low Earth orbit, its vacuum and temperature. Testing consisted of three passive tests with the active cryocooler system off, and 7 active tests, with the cryocooler powered up. The test matrix included zero boil-off tests performed at 90 full and 25 full, and several demonstrations at excess cooling capacity and reduced cooling capacity. From this, the tank pressure response with varied cryocooler power inputs was determined. This test series established that the active cooling system integrated with the propellant tank eliminated boil-off and robustly controlled tank pressure.
Experimental Investigation of Jet-Induced Mixing of a Large Liquid Hydrogen Storage Tank
NASA Technical Reports Server (NTRS)
Lin, C. S.; Hasan, M. M.; Vandresar, N. T.
1994-01-01
Experiments have been conducted to investigate the effect of fluid mixing on the depressurization of a large liquid hydrogen storage tank. The test tank is approximately ellipsoidal, having a volume of 4.89 m(exp 3) and an average wall heat flux of 4.2 W/m(exp 2) due to external heat input. A mixer unit was installed near the bottom of the tank to generate an upward directed axial jet flow normal to the liquid-vapor interface. Mixing tests were initiated after achieving thermally stratified conditions in the tank either by the introduction of hydrogen gas into the tank or by self-pressurization due to ambient heat leak through the tank wall. The subcooled liquid jet directed towards the liquid-vapor interface by the mixer induced vapor condensation and caused a reduction in tank pressure. Tests were conducted at two jet submergence depths for jet Reynolds numbers from 80,000 to 495,000 and Richardson numbers from 0.014 to 0.52. Results show that the rate of tank pressure change is controlled by the competing effects of subcooled jet flow and the free convection boundary layer flow due to external tank wall heating. It is shown that existing correlations for mixing time and vapor condensation rate based on small scale tanks may not be applicable to large scale liquid hydrogen systems.
On the Behavior of Different PCMs in a Hot Water Storage Tank against Thermal Demands.
Porteiro, Jacobo; Míguez, José Luis; Crespo, Bárbara; de Lara, José; Pousada, José María
2016-03-21
Advantages, such as thermal storage improvement, are found when using PCMs (Phase Change Materials) in storage tanks. The inclusion of three different types of materials in a 60 l test tank is studied. Two test methodologies were developed, and four tests were performed following each methodology. A thermal analysis is performed to check the thermal properties of each PCM. The distributions of the water temperatures inside the test tanks are evaluated by installing four Pt-100 sensors at different heights. A temperature recovery is observed after exposing the test tank to an energy demand. An energetic analysis that takes into account the energy due to the water temperature, the energy due to the PCM and the thermal loss to the ambient environment is also presented. The percentage of each PCM that remains in the liquid state after the energy demand is obtained.
On the Behavior of Different PCMs in a Hot Water Storage Tank against Thermal Demands
Porteiro, Jacobo; Míguez, José Luis; Crespo, Bárbara; de Lara, José; Pousada, José María
2016-01-01
Advantages, such as thermal storage improvement, are found when using PCMs (Phase Change Materials) in storage tanks. The inclusion of three different types of materials in a 60 𝓁 test tank is studied. Two test methodologies were developed, and four tests were performed following each methodology. A thermal analysis is performed to check the thermal properties of each PCM. The distributions of the water temperatures inside the test tanks are evaluated by installing four Pt-100 sensors at different heights. A temperature recovery is observed after exposing the test tank to an energy demand. An energetic analysis that takes into account the energy due to the water temperature, the energy due to the PCM and the thermal loss to the ambient environment is also presented. The percentage of each PCM that remains in the liquid state after the energy demand is obtained. PMID:28773339
Detection of tanker defects with infrared thermography
NASA Technical Reports Server (NTRS)
Kantsios, A. G.
1980-01-01
Infrared scanning technique for finding defects in secondary barrier of liquid natural gas (LNG) tank has been successfully tested on ship under construction at Newport News Shipbuilding and Dry Dock Company. Technique determines defects with minimal expenditure of time and manpower. Tests could be repeated during life of tanker and make more complicated testing unnecessary. Tests also confirmed that tank did not have any major defects, and tank was certified.
2017-12-08
NASA Kennedy Space Center's Engineering Directorate held a banner signing event in the Prototype Development Laboratory to mark the successful delivery of a liquid oxygen test tank, called Tardis. Engineers and technicians worked together to develop the tank and build it to support cryogenic testing at Johnson Space Center's White Stands Test Facility in Las Cruces, New Mexico. The 12-foot-tall, 3,810-pound aluminum tank will be shipped to White Sands for testing.
ADM. Tanks: from left to right: fuel oil tank, fuel ...
ADM. Tanks: from left to right: fuel oil tank, fuel pump house (TAN-611), engine fuel tank, water pump house, water storage tank. Camera facing northwest. Not edge of shielding berm at left of view. Date: November 25, 1953. INEEL negative no. 9217 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
2017-06-29
This video shows the Space Launch System liquid hydrogen tank structural qualification test article being moved to Building 110, Cell at NASA's Michoud Assembly Facility in New Orleans. The rocket's liquid hydrogen tank, which is the propellant tank that joins to the engine section of the 212-foot tall core stage, will carry cryogenic liquid hydrogen that propels the rocket. This test article build at Michoud is being prepared for testing at NASA's Marshall Space Flight Center in Huntsville, Alabama. There, it will be subjected to millions of pounds of force during testing to ensure the hardware can withstand the incredible stresses of launch.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-0938] Draft Guidance for Industry on Abbreviated New Drug Applications: Stability Testing of Drug Substances... Products, Questions and Answers.'' Because of increases in the number and complexity of ANDAs and FDA's...
Space Shuttle External Tank Project status
NASA Technical Reports Server (NTRS)
Davis, R. M.
1980-01-01
The External Tank Project is reviewed with emphasis on the DDT&E and production phases and the lightweight tank development. It is noted that the DDT&E phase is progressing well with the structural and ground vibration test article programs complete, the propulsion test article program progressing well, and the component qualification and verification testing 92% complete. New tools and facilities are being brought on line to support the increased build rate for the production phase. The lightweight tank, which will provide additional payload in orbit, is progressing to schedule with first delivery in early 1982.
NASA Technical Reports Server (NTRS)
Sharpe, E. L.; Jackson, L. R.
1975-01-01
A model which consisted of a hot structure and a nonintegral tank protected by a carbon dioxide frost thermal protection system was tested under the following conditions: (1) room temperature loading and (2) heating and loading corresponding to the Mach 8 flight of an air-breathing launch vehicle. In the simulated flight tests, liquid nitrogen inside the tank was withdrawn at the rate fuel would be consumed. Prior to each simulated flight test, carbon dioxide was cryodeposited in the insulation surrounding the tank; during the tests, subliming CO2 frost absorbed heat and provided a purge gas for the space between the tank and the structure. A method of flame spraying the joints between panels with a nickel-aluminum material was developed to prevent excessive leakage of the purge gas through the outer structure. The tests indicated that the hot structure (with a joint repaired by riveting), the nonintegral tank and suspension system, and the carbon dioxide frost thermal protection system provide a workable concept with predictable performance.
Investigation of thermolytic hydrogen generation rate of tank farm simulated and actual waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martino, C.; Newell, D.; Woodham, W.
To support resolution of Potential Inadequacies in the Safety Analysis for the Savannah River Site (SRS) Tank Farm, Savannah River National Laboratory conducted research to determine the thermolytic hydrogen generation rate (HGR) with simulated and actual waste. Gas chromatography methods were developed and used with air-purged flow systems to quantify hydrogen generation from heated simulated and actual waste at rates applicable to the Tank Farm Documented Safety Analysis (DSA). Initial simulant tests with a simple salt solution plus sodium glycolate demonstrated the behavior of the test apparatus by replicating known HGR kinetics. Additional simulant tests with the simple salt solutionmore » excluding organics apart from contaminants provided measurement of the detection and quantification limits for the apparatus with respect to hydrogen generation. Testing included a measurement of HGR on actual SRS tank waste from Tank 38. A final series of measurements examined HGR for a simulant with the most common SRS Tank Farm organics at temperatures up to 140 °C. The following conclusions result from this testing.« less
Numerical Modeling of Propellant Boiloff in Cryogenic Storage Tank
NASA Technical Reports Server (NTRS)
Majumdar, A. K.; Steadman, T. E.; Maroney, J. L.
2007-01-01
This Technical Memorandum (TM) describes the thermal modeling effort undertaken at Marshall Space Flight Center to support the Cryogenic Test Laboratory at Kennedy Space Center (KSC) for a study of insulation materials for cryogenic tanks in order to reduce propellant boiloff during long-term storage. The Generalized Fluid System Simulation program has been used to model boiloff in 1,000-L demonstration tanks built for testing the thermal performance of glass bubbles and perlite insulation. Numerical predictions of boiloff rate and ullage temperature have been compared with the measured data from the testing of demonstration tanks. A satisfactory comparison between measured and predicted data has been observed for both liquid nitrogen and hydrogen tests. Based on the experience gained with the modeling of the demonstration tanks, a numerical model of the liquid hydrogen storage tank at launch complex 39 at KSC was built. The predicted boiloff rate of hydrogen has been found to be in good agreement with observed field data. This TM describes three different models that have been developed during this period of study (March 2005 to June 2006), comparisons with test data, and results of parametric studies.
Differential Draining of Parallel-Fed Propellant Tanks in Morpheus and Apollo Flight
NASA Technical Reports Server (NTRS)
Hurlbert, Eric; Guardado, Hector; Hernandez, Humberto; Desai, Pooja
2015-01-01
Parallel-fed propellant tanks are an advantageous configuration for many spacecraft. Parallel-fed tanks allow the center of gravity (cg) to be maintained over the engine(s), as opposed to serial-fed propellant tanks which result in a cg shift as propellants are drained from tank one tank first opposite another. Parallel-fed tanks also allow for tank isolation if that is needed. Parallel tanks and feed systems have been used in several past vehicles including the Apollo Lunar Module. The design of the feedsystem connecting the parallel tank is critical to maintain balance in the propellant tanks. The design must account for and minimize the effect of manufacturing variations that could cause delta-p or mass flowrate differences, which would lead to propellant imbalance. Other sources of differential draining will be discussed. Fortunately, physics provides some self-correcting behaviors that tend to equalize any initial imbalance. The question concerning whether or not active control of propellant in each tank is required or can be avoided or not is also important to answer. In order to provide data on parallel-fed tanks and differential draining in flight for cryogenic propellants (as well as any other fluid), a vertical test bed (flying lander) for terrestrial use was employed. The Morpheus vertical test bed is a parallel-fed propellant tank system that uses passive design to keep the propellant tanks balanced. The system is operated in blow down. The Morpheus vehicle was instrumented with a capacitance level sensor in each propellant tank in order to measure the draining of propellants in over 34 tethered and 12 free flights. Morpheus did experience an approximately 20 lb/m imbalance in one pair of tanks. The cause of this imbalance will be discussed. This paper discusses the analysis, design, flight simulation vehicle dynamic modeling, and flight test of the Morpheus parallel-fed propellant. The Apollo LEM data is also examined in this summary report of the flight data.
Side impact test and analyses of a DOT-111 tank car : final report.
DOT National Transportation Integrated Search
2015-10-01
Transportation Technology Center, Inc. conducted a side impact test on a DOT-111 tank car to evaluate the performance of the : tank car under dynamic impact conditions and to provide data for the verification and refinement of a computational model. ...
Cyclic Cryogenic Thermal-Mechanical Testing of an X-33/RLV Liquid Oxygen Tank Concept
NASA Technical Reports Server (NTRS)
Rivers, H. Kevin
1999-01-01
An important step in developing a cost-effective, reusable, launch vehicle is the development of durable, lightweight, insulated, cryogenic propellant tanks. Current cryogenic tanks are expendable so most of the existing technology is not directly applicable to future launch vehicles. As part of the X-33/Reusable Launch Vehicle (RLV) Program, an experimental apparatus developed at the NASA Langley Research Center for evaluating the effects of combined, cyclic, thermal and mechanical loading on cryogenic tank concepts was used to evaluate cryogenic propellant tank concepts for Lockheed-Martin Michoud Space Systems. An aluminum-lithium (Al 2195) liquid oxygen tank concept, insulated with SS-1171 and PDL-1034 cryogenic insulation, is tested under simulated mission conditions, and the results of those tests are reported. The tests consists of twenty-five simulated Launch/Abort missions and twenty-five simulated flight missions with temperatures ranging from -320 F to 350 F and a maximum mechanical load of 71,300 lb. in tension.
X-33 LH2 Tank Failure Investigation Findings
NASA Technical Reports Server (NTRS)
Niedermeyer, Melinda
2003-01-01
This viewgraph presentation provides information on the composite sandwich-honeycomb structure of the liquid hydrogen tank of the X-33 reusable launch vehicle, and describes why the the first pressure test to determine the tank's structural integrity failed. The presentation includes images of the tank before and after the failed test, including photomicrographs. It then reaches conclusions on the nature of the microcracks which caused the liquid hydrogen leakage.
Composite Cryotank Technologies and Development 2.4 and 5.5M out of Autoclave Tank Test Results
NASA Technical Reports Server (NTRS)
Jackson, Justin R.; Vickers, John; Fikes, John
2015-01-01
The Composite Cryotank Technologies and Demonstration (CCTD) project substantially matured composite, cryogenic propellant tank technology. The project involved the design, analysis, fabrication, and testing of large-scale (2.4-m-diameter precursor and 5.5-m-diameter) composite cryotanks. Design features included a one-piece wall design that minimized tank weight, a Y-joint that incorporated an engineered material to alleviate stress concentration under combined loading, and a fluted core cylindrical section that inherently allows for venting and purging. The tanks used out-of-autoclave (OoA) cured graphite/epoxy material and processes to enable large (up to 10-m-diameter) cryotank fabrication, and thin-ply prepreg to minimize hydrogen permeation through tank walls. Both tanks were fabricated at Boeing using automated fiber placement on breakdown tooling. A fluted core skirt that efficiently carried axial loads and enabled hydrogen purging was included on the 5.5-m-diameter tank. Ultrasonic inspection was performed, and a structural health monitoring system was installed to identify any impact damage during ground processing. The precursor and 5.5-m-diameter tanks were tested in custom test fixtures at the National Aeronautics and Space Administration Marshall Space Flight Center. The testing, which consisted of a sequence of pressure and thermal cycles using liquid hydrogen, was successfully concluded and obtained valuable structural, thermal, and permeation performance data. This technology can be applied to a variety of aircraft and spacecraft applications that would benefit from 30 to 40% weight savings and substantial cost savings compared to aluminum lithium tanks.
NASA Technical Reports Server (NTRS)
Lak, Tibor; Weeks, D. P.
1995-01-01
The primary challenge of the X-33 CAN is to build and test a prototype LO2 and LH2 densification ground support equipment (GSE) unit, and perform tank thermodynamic testing within the 15 month phase 1 period. The LO2 and LH2 propellant densification system will be scaled for the IPTD LO2 and LH2 tank configurations. The IPTD tanks were selected for the propellant technology demonstration because of the potential benefits to the phase 1 plan: tanks will be built in time to support thermodynamic testing; minimum cost; minimum schedule risk; future testing at MSFC will build on phase 1 data base; and densification system will be available to support X-33 and RLV engine test at IPTD. The objective of the task 1 effort is to define the preliminary requirements of the propellant densification GSE and tank recirculation system. The key densification system design parameters to be established in Task 1 are: recirculation flow rate; heat exchanger inlet temperature; heat exchanger outlet temperature; maximum heat rejection rate; vent flow rate (GN2 and GH2); densification time; and tank pressure level.
Side impact test and analysis of a DOT-112 tank car.
DOT National Transportation Integrated Search
2016-12-01
As part of a program to improve transportation safety for tank cars, Transportation Technology Center, Inc. (TTCI) has conducted a side impact test on a DOT-112 tank car to evaluate the performance of the DOT-112 under dynamic impact conditions and t...
40 CFR 63.563 - Compliance and performance testing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal... devices, sampling, and venting for maintenance. Marine tank vessel loading operations shall not be...
40 CFR 63.563 - Compliance and performance testing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal... devices, sampling, and venting for maintenance. Marine tank vessel loading operations shall not be...
ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
HUBER, J.H.
1999-08-17
This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gauge prior to installation package preparation.
2017-12-08
Workers sign the banner marking the successful delivery of a liquid oxygen test tank, called Tardis, in the Prototype Development Laboratory at NASA's Kennedy Space Center in Florida. Engineers and technicians worked together to develop the tank and build it at the lab to support cryogenic testing at Johnson Space Center's White Sands Test Facility in Las Cruces, New Mexico. The 12-foot-tall, 3,810-pound aluminum tank will be shipped to White Sands for testing.
NASA Technical Reports Server (NTRS)
Slaughter, B. C.
1988-01-01
The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Main Propulsion System (MPS) hardware, generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to available data from the Rockwell Downey/NASA JSC FMEA/CIL review. The Orbiter MPS is composed of the Propellant Management Subsystem (PMS) consisting of the liquid oxygen (LO2) and liquid hydrogen (LH2) subsystems and the helium subsystem. The PMS is a system of manifolds, distribution lines, and valves by which the liquid propellants pass from the External Tank to the Space Shuttle Main Engine (SSME). The helium subsystem consists of a series of helium supply tanks and their associated regulators, control valves, and distribution lines. Volume 1 contains the MPS description, assessment results, ground rules and assumptions, and some of the IOA worksheets.
Internally insulated thermal storage system development program
NASA Technical Reports Server (NTRS)
Scott, O. L.
1980-01-01
A cost effective thermal storage system for a solar central receiver power system using molten salt stored in internally insulated carbon steel tanks is described. Factors discussed include: testing of internal insulation materials in molten salt; preliminary design of storage tanks, including insulation and liner installation; optimization of the storage configuration; and definition of a subsystem research experiment to demonstrate the system. A thermal analytical model and analysis of a thermocline tank was performed. Data from a present thermocline test tank was compared to gain confidence in the analytical approach. A computer analysis of the various storage system parameters (insulation thickness, number of tanks, tank geometry, etc.,) showed that (1) the most cost-effective configuration was a small number of large cylindrical tanks, and (2) the optimum is set by the mechanical constraints of the system, such as soil bearing strength and tank hoop stress, not by the economics.
Internally insulated thermal storage system development program
NASA Astrophysics Data System (ADS)
Scott, O. L.
1980-03-01
A cost effective thermal storage system for a solar central receiver power system using molten salt stored in internally insulated carbon steel tanks is described. Factors discussed include: testing of internal insulation materials in molten salt; preliminary design of storage tanks, including insulation and liner installation; optimization of the storage configuration; and definition of a subsystem research experiment to demonstrate the system. A thermal analytical model and analysis of a thermocline tank was performed. Data from a present thermocline test tank was compared to gain confidence in the analytical approach. A computer analysis of the various storage system parameters (insulation thickness, number of tanks, tank geometry, etc.,) showed that (1) the most cost-effective configuration was a small number of large cylindrical tanks, and (2) the optimum is set by the mechanical constraints of the system, such as soil bearing strength and tank hoop stress, not by the economics.
2007-12-30
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a team of external tank specialists from Lockheed Martin and the United Space Alliance undertakes the task of removing the hydrogen feed-through connector in support of space shuttle Atlantis' STS-122 mission. Here, technicians wrap the connector for transport to NASA's Marshall Space Flight Center in Huntsville, Ala., for further cryogenic testing. Some of the tank's engine cutoff sensors, or ECO sensors, failed during propellant tanking for launch attempts on Dec. 6 and Dec. 9. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. After the data from additional testing on the connector is analyzed, shuttle program managers will decide on a forward plan. Launch of STS-122 is targeted for January 2008. Photo credit: NASA/George Shelton
2007-12-30
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a team of external tank specialists from Lockheed Martin and the United Space Alliance undertakes the task of removing the hydrogen feed-through connector in support of space shuttle Atlantis' STS-122 mission. Here, technicians wrap the connector for transport to NASA's Marshall Space Flight Center in Huntsville, Ala., for further cryogenic testing. Some of the tank's engine cutoff sensors, or ECO sensors, failed during propellant tanking for launch attempts on Dec. 6 and Dec. 9. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. After the data from additional testing on the connector is analyzed, shuttle program managers will decide on a forward plan. Launch of STS-122 is targeted for January 2008. Photo credit: NASA/George Shelton
Vented Tank Resupply Experiment--Flight Test Results
NASA Technical Reports Server (NTRS)
Chato, David J.; Martin, Timothy A.
1997-01-01
This paper reports the results of the Vented Tank Resupply Experiment (VTRE) which was flown as a payload on STS 77. VTRE looks at the ability of vane Propellant Management Devices (PMD) to separate liquid and gas in low gravity. VTRE used two clear 0.8 cubic foot tanks one spherical and one with a short barrel section and transferred Refrigerant 113 between them as well as venting it to space. Tests included retention of liquid during transfer, liquid free venting, and recovery of liquid into the PMD after thruster firing. Liquid was retained successfully at the highest flow rate tested (2.73 gpm). Liquid free vents were achieved for both tanks, although at a higher flow rate (0.1591 cfm) for the spherical tank than the other (0.0400 cfm). Recovery from a thruster firing which moved the liquid to the opposite end of the tank from the PMD was achieved in 30 seconds.
Effects of coupler height mismatch on the structural integrity of railroad tank car stub sills.
DOT National Transportation Integrated Search
2001-12-01
This project evaluated the safety implications of coupler height mismatches on the integrity of railroad tank car stub sills, through a series of static and impact tests. The test car was a loaded tank car instrumented with strain gages at critical l...
40 CFR 63.563 - Compliance and performance testing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... marine tank vessel can document that repair is technically infeasible without cleaning and gas freeing or... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal...
40 CFR 63.563 - Compliance and performance testing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... marine tank vessel can document that repair is technically infeasible without cleaning and gas freeing or... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal...
49 CFR 179.100-19 - Tests of safety relief valves.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Tests of safety relief valves. 179.100-19 Section... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120...
49 CFR 179.100-19 - Tests of safety relief valves.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Tests of safety relief valves. 179.100-19 Section... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-19...
49 CFR 179.100-19 - Tests of safety relief valves.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Tests of safety relief valves. 179.100-19 Section... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-19...
49 CFR 179.100-19 - Tests of safety relief valves.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Tests of safety relief valves. 179.100-19 Section... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-19...
VIEW OF PROCESS DEVELOPMENT PILE (PDP) TANK, LOOKING WESTSOUTHWEST, BASEMENT ...
VIEW OF PROCESS DEVELOPMENT PILE (PDP) TANK, LOOKING WEST-SOUTHWEST, BASEMENT LEVEL -15. EDGE O FRESONANCE TEST REACTOR (RTR), LATER KNOWN AS LATTICE TEST REACTOR (LTR), VISIBLE TO RIGHT OF PDP TANK - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
Isopropyl alcohol tank installed at A-3 Test Stand
NASA Technical Reports Server (NTRS)
2009-01-01
An isopropyl alcohol (IPA) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen IPA, water and liquid oxygen (LOX) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.
Water tank installed at A-3 Test Stand
NASA Technical Reports Server (NTRS)
2009-01-01
A water tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen water, liquid oxygen (LOX) and isopropyl alcohol (IPA) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.
Liquid oxygen tank installed at A-3 Test Stand
NASA Technical Reports Server (NTRS)
2009-01-01
A liquid oxygen (LOX) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen LOX, isopropyl alcohol (IPA) and water tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.
Water tank installed at A-3 Test Stand
2009-08-13
A water tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen water, liquid oxygen (LOX) and isopropyl alcohol (IPA) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.
Liquid oxygen tank installed at A-3 Test Stand
2009-09-18
A liquid oxygen (LOX) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen LOX, isopropyl alcohol (IPA) and water tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.
Isopropyl alcohol tank installed at A-3 Test Stand
2009-09-18
An isopropyl alcohol (IPA) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen IPA, water and liquid oxygen (LOX) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-06-08
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-10-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FB SR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-S.2.1-20 1 0-00 1, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, 'Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.'« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-04-21
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-l0-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FBSR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-5.2.1-2010-001, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.« less
Preoperational test report, recirculation ventilation systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clifton, F.T.
1997-11-11
This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.
49 CFR 178.255-13 - Repair of tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Repair of tanks. 178.255-13 Section 178.255-13 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... Portable Tanks § 178.255-13 Repair of tanks. (a) Tanks failing to meet the test may be repaired and...
46 CFR 119.435 - Integral fuel tanks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Integral fuel tanks. 119.435 Section 119.435 Shipping... Machinery Requirements § 119.435 Integral fuel tanks. (a) Diesel fuel tanks may not be built integral with... for certification of a vessel, integral fuel tanks must withstand a hydrostatic pressure test of 35 k...
Design criteria monograph for metal tanks and tank components
NASA Technical Reports Server (NTRS)
1975-01-01
Significant elements in detail tank design are wall and end structures, weld joints at bulkhead and attachment junctures, and ports and access openings. Additional design considerations are influence and effect of fabrication processes on tank component design, and finally, testing and inspection that are required to establish confidence in tank design.
46 CFR 119.435 - Integral fuel tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Integral fuel tanks. 119.435 Section 119.435 Shipping... Machinery Requirements § 119.435 Integral fuel tanks. (a) Diesel fuel tanks may not be built integral with... for certification of a vessel, integral fuel tanks must withstand a hydrostatic pressure test of 35 k...
Flow characteristics of an inclined air-curtain range hood in a draft
CHEN, Jia-Kun
2015-01-01
The inclined air-curtain technology was applied to build an inclined air-curtain range hood. A draft generator was applied to affect the inclined air-curtain range hood in three directions: lateral (θ=0°), oblique (θ=45°), and front (θ=90°). The three suction flow rates provided by the inclined air-curtain range hood were 10.1, 10.9, and 12.6 m3/min. The laser-assisted flow visualization technique and the tracer-gas test method were used to investigate the performance of the range hood under the influence of a draft. The results show that the inclined air-curtain range hood has a strong ability to resist the negative effect of a front draft until the draft velocity is greater than 0.5 m/s. The oblique draft affected the containment ability of the inclined air-curtain range hood when the draft velocity was larger than 0.3 m/s. When the lateral draft effect was applied, the capture efficiency of the inclined air-curtain range hood decreased quickly in the draft velocity from 0.2 m/s to 0.3 m/s. However, the capture efficiencies of the inclined air-curtain range hood under the influence of the front draft were higher than those under the influence of the oblique draft from 0.3 m/s to 0.5 m/s. PMID:25810445
Flow characteristics of an inclined air-curtain range hood in a draft.
Chen, Jia-Kun
2015-01-01
The inclined air-curtain technology was applied to build an inclined air-curtain range hood. A draft generator was applied to affect the inclined air-curtain range hood in three directions: lateral (θ=0°), oblique (θ=45°), and front (θ=90°). The three suction flow rates provided by the inclined air-curtain range hood were 10.1, 10.9, and 12.6 m(3)/min. The laser-assisted flow visualization technique and the tracer-gas test method were used to investigate the performance of the range hood under the influence of a draft. The results show that the inclined air-curtain range hood has a strong ability to resist the negative effect of a front draft until the draft velocity is greater than 0.5 m/s. The oblique draft affected the containment ability of the inclined air-curtain range hood when the draft velocity was larger than 0.3 m/s. When the lateral draft effect was applied, the capture efficiency of the inclined air-curtain range hood decreased quickly in the draft velocity from 0.2 m/s to 0.3 m/s. However, the capture efficiencies of the inclined air-curtain range hood under the influence of the front draft were higher than those under the influence of the oblique draft from 0.3 m/s to 0.5 m/s.
2017-12-08
Inside the Prototype Development Laboratory at NASA's Kennedy Space Center in Florida, workers in the lab hold a banner marking the successful delivery of a liquid oxygen test tank called Tardis. Engineers and technicians worked together to develop the tank to build it at the lab to support cryogenic testing at Johnson Space Center's White Sands Test Facility in Las Cruces, New Mexico. The 12-foot-tall, 3,810-pound aluminum tank will be shipped to White Sands for testing.
2017-12-08
NASA Kennedy Space Center's Engineering Director Pat Simpkins signs the banner marking the successful delivery of a liquid oxygen test tank, called Tardis, in the Prototype Development Laboratory at NASA's Kennedy Space Center in Florida. Engineers and technicians worked together to develop the tank and build it to support cryogenic testing at Johnson Space Center's White Stands Test Facility in Las Cruces, New Mexico. The 12-foot-tall, 3,810-pound aluminum tank will be shipped to White Sands for testing.
Crack Growth of D6 Steel in Air and High Pressure Oxygen
NASA Technical Reports Server (NTRS)
Bixler, W. D.; Engstrom, W. L.
1971-01-01
Fracture and subcritical flaw growth characteristics were experimentally determined for electroless nickel plated D6 steel in dry air and high pressure oxygen environments as applicable to the Lunar Module/Environmental Control System (LM/ECS) descent gaseous oxygen (GOX) tank. The material tested included forgings, plate, and actual LM/ECS descent GOX tank material. Parent metal and TIG (tungsten inert gas) welds were tested. Tests indicate that proof testing the tanks at 4000 pounds per square inch or higher will insure safe operation at 3060 pounds per square inch. Although significant flaw growth can occur during proofing, subsequent growth of flaws during normal tank operation is negligible.
Elemental Water Impact Test: Phase 2 36-Inch Aluminum Tank Head
NASA Technical Reports Server (NTRS)
Vassilakos, Gregory J.
2014-01-01
Spacecraft are being designed based on LS-DYNA simulations of water landing impacts. The Elemental Water Impact Test (EWIT) series was undertaken to assess the accuracy of LS-DYNA water impact simulations. EWIT Phase 2 featured a 36-inch aluminum tank head. The tank head was outfitted with one accelerometer, twelve pressure transducers, three string potentiometers, and four strain gages. The tank head was dropped from heights of 1 foot and 2 feet. The focus of this report is the correlation of analytical models against test data. As a measure of prediction accuracy, peak responses from the baseline LS-DYNA model were compared to peak responses from the tests.
TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stefanko, D.; Langton, C.
2012-01-03
High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale upmore » test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.« less
46 CFR 160.035-11 - Inspection and testing of lifeboats.
Code of Federal Regulations, 2010 CFR
2010-10-01
... equipment, provision lockers, water tanks, or fuel tanks aboard. If provision lockers, water tanks, and fuel..., propeller, radio battery, searchlight, etc., if they are to be installed. (i) Boats with independent... course and fuel consumption tests on a time basis shall be made to determine that the fully loaded motor...
Alternative Chemical Cleaning Methods for High Level Waste Tanks: Simulant Studies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rudisill, T.; King, W.; Hay, M.
Solubility testing with simulated High Level Waste tank heel solids has been conducted in order to evaluate two alternative chemical cleaning technologies for the dissolution of sludge residuals remaining in the tanks after the exhaustion of mechanical cleaning and sludge washing efforts. Tests were conducted with non-radioactive pure phase metal reagents, binary mixtures of reagents, and a Savannah River Site PUREX heel simulant to determine the effectiveness of an optimized, dilute oxalic/nitric acid cleaning reagent and pure, dilute nitric acid toward dissolving the bulk non-radioactive waste components. A focus of this testing was on minimization of oxalic acid additions duringmore » tank cleaning. For comparison purposes, separate samples were also contacted with pure, concentrated oxalic acid which is the current baseline chemical cleaning reagent. In a separate study, solubility tests were conducted with radioactive tank heel simulants using acidic and caustic permanganate-based methods focused on the “targeted” dissolution of actinide species known to be drivers for Savannah River Site tank closure Performance Assessments. Permanganate-based cleaning methods were evaluated prior to and after oxalic acid contact.« less
APU diaphragm testing. Test plan
NASA Technical Reports Server (NTRS)
Shelley, Richard
1992-01-01
Auxiliary Power Unit (APU) fuel (hydrazine) tanks have had to be removed from the Columbia Shuttle (OV-102) because they have been in service for 11 years, which is the limit of their useful life. As part of an effort to determine whether the useful life of the fuel tanks can be extended, examination of the ethylene propylene rubber (EPR) diaphragm and the metal from one of the APU tanks is required. The JSC Propulsion and Power Division has requested White Sands Test Facility (WSTF) to examine the EPR diaphragm thoroughly and the metal casing generally from one tank. The objective is to examine the EPR diaphragm for signs of degradation that may limit the life of its function in the APU propellant tank. The metal casing will also be examined for signs of surface corrosion.
49 CFR 178.255-12 - Pressure test.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Specifications for Portable Tanks § 178.255-12 Pressure test. (a) Each completed portable tank prior to application of lining shall be tested before being put into transportation service by completely filling the...
Fracture Testing of Integral Stiffened Structure
NASA Technical Reports Server (NTRS)
Newman, John A.; Smith, Stephen W.; Piascik, Robert S.; Dawicke, David S.; Johnston, William M.; Willard, Scott A.
2008-01-01
Laboratory testing was conducted to evaluate safety concerns for integrally-stiffened tanks that were found to have developed cracks during pressurization testing. Cracks occurred at fastener holes where additional stiffeners were attached to the integrally-stiffened tank structure. Tests were conducted to obtain material properties and to reproduce the crack morphologies that were observed in service to help determine if the tanks are safe for operation. Reproducing the cracking modes observed during pressurization testing required a complex loading state involving both a tensile load in the integrally-stiffened structure and a pin-load at a fastener hole.
Testing and recommended practices to improve nurse tank safety, phase I : [research brief].
DOT National Transportation Integrated Search
2013-10-01
This study focuses on determining causes and possible inspection remediation strategies to reduce the occurrence of anhydrous ammonia (NH3) nurse tank failures. Nurse tanks are cylindrical steel tank shells with hemispherical or elliptical end caps r...
Testing and recommended practices to improve nurse tank safety, phase I.
DOT National Transportation Integrated Search
2013-10-01
This research project studied causes and possible remediation inspection strategies to prevent failures for anhydrous ammonia (NH3) nurse tanks. Nurse tanks are steel tanks used to transport NH3 locally over public roadways and farm fields. Many of t...
Testing and Recommended Practices to Improve Nurse Tank Safety, Phase I
DOT National Transportation Integrated Search
2013-10-01
This research project studied causes and possible remediation inspection strategies to prevent failures for anhydrous ammonia (NH3) nurse tanks. Nurse tanks are steel tanks used to transport NH3 locally over public roadways and farm fields. Many of t...
Solomon, Gary S; Haase, Richard F; Kuhn, Andrew
2013-02-01
Sports neuropsychology has emerged as a specialty area within the field of clinical neuropsychology. The role of the sports neuropsychologist, rooted in baseline and post-concussion testing, has evolved to include other clinical domains, including the clinical assessment of potential draft picks. There is no published information on the neurocognitive characteristics of these draft picks. We sought to determine whether elite NFL draft picks differed from NFL roster athletes on neurocognitive (ImPACT) and biopsychosocial characteristics, and given that no published data exists for this population, adopted null hypotheses. Null hypotheses were rejected for two of the four ImPACT scores, as elite draft picks scored higher on measures of visual motor speed and reaction time than roster NFL athletes. Subtle but distinct neurocognitive differences are noted when comparing elite NFL draft picks with norms from a cumulative roster of a single NFL team.
NASA Technical Reports Server (NTRS)
Perez, Jose G.; Parks, Russel A.; Lazor, Daniel R.
2012-01-01
The slosh dynamics of propellant tanks can be represented by an equivalent pendulum-mass mechanical model. The parameters of this equivalent model, identified as slosh model parameters, are slosh mass, slosh mass center of gravity, slosh frequency, and smooth-wall damping. They can be obtained by both analysis and testing for discrete fill heights. Anti-slosh baffles are usually needed in propellant tanks to control the movement of the fluid inside the tank. Lateral slosh testing, involving both random testing and free-decay testing, are performed to validate the slosh model parameters and the damping added to the fluid by the anti-slosh baffles. Traditional modal analysis procedures are used to extract the parameters from the experimental data. Test setup of sub-scale test articles of cylindrical and spherical shapes will be described. A comparison between experimental results and analysis will be presented.
Integration and software for thermal test of heat rate sensors. [space shuttle external tank
NASA Technical Reports Server (NTRS)
Wojciechowski, C. J.; Shrider, K. R.
1982-01-01
A minicomputer controlled radiant test facility is described which was developed and calibrated in an effort to verify analytical thermal models of instrumentation islands installed aboard the space shuttle external tank to measure thermal flight parameters during ascent. Software was provided for the facility as well as for development tests on the SRB actuator tail stock. Additional testing was conducted with the test facility to determine the temperature and heat flux rate and loads required to effect a change of color in the ET tank external paint. This requirement resulted from the review of photographs taken of the ET at separation from the orbiter which showed that 75% of the external tank paint coating had not changed color from its original white color. The paint on the remaining 25% of the tank was either brown or black, indicating that it had degraded due to heating or that the spray on form insulation had receded in these areas. The operational capability of the facility as well as the various tests which were conducted and their results are discussed.
Sierer, S Patrick; Battaglini, Claudio L; Mihalik, Jason P; Shields, Edgar W; Tomasini, Nathan T
2008-01-01
The purpose of this study was to examine performance differences between drafted and nondrafted athletes (N = 321) during the 2004 and 2005 National Football League (NFL) Combines. We categorized players into one of 3 groups: Skill, Big skill, and Linemen. Skill players (SP) consisted of wide receivers, cornerbacks, free safeties, strong safeties, and running backs. Big skill players (BSP) included fullbacks, linebackers, tight ends, and defensive ends. Linemen (LM) consisted of centers, offensive guards, offensive tackles, and defensive tackles. We analyzed player height and mass, as well as performance on the following combine drills: 40-yard dash, 225-lb bench press test, vertical jump, broad jump, pro-agility shuttle, and the 3-cone drill. Student t-tests compared performance on each of these measures between drafted and nondrafted players. Statistical significance was found between drafted and nondrafted SP for the 40-yard dash (P < 0.001), vertical jump (P = 0.003), pro-agility shuttle (P < 0.001), and 3-cone drill (P < 0.001). Drafted and nondrafted BSP performed differently on the 40-yard dash (P = 0.002) and 3-cone drill (P = 0.005). Finally, drafted LM performed significantly better than nondrafted LM on the 40-yard dash (P = 0.016), 225-lb bench press (P = 0.003), and 3-cone drill (P = 0.005). Certified strength and conditioning specialists will be able to utilize the significant findings to help better prepare athletes as they ready themselves for the NFL Combine.
Liquid Oxygen Thermodynamic Vent System Testing with Helium Pressurization
NASA Technical Reports Server (NTRS)
VanDresar, Neil T.
2014-01-01
This report presents the results of several thermodynamic vent system (TVS) tests with liquid oxygen plus a test with liquid nitrogen. In all tests, the liquid was heated above its normal boiling point to 111 K for oxygen and 100 K for nitrogen. The elevated temperature was representative of tank conditions for a candidate lunar lander ascent stage. An initial test series was conducted with saturated oxygen liquid and vapor at 0.6 MPa. The initial series was followed by tests where the test tank was pressurized with gaseous helium to 1.4 to 1.6 MPa. For these tests, the helium mole fraction in the ullage was quite high, about 0.57 to 0.62. TVS behavior is different when helium is present than when helium is absent. The tank pressure becomes the sum of the vapor pressure and the partial pressure of helium. Therefore, tank pressure depends not only on temperature, as is the case for a pure liquid-vapor system, but also on helium density (i.e., the mass of helium divided by the ullage volume). Thus, properly controlling TVS operation is more challenging with helium pressurization than without helium pressurization. When helium was present, the liquid temperature would rise with each successive TVS cycle if tank pressure was kept within a constant control band. Alternatively, if the liquid temperature was maintained within a constant TVS control band, the tank pressure would drop with each TVS cycle. The final test series, which was conducted with liquid nitrogen pressurized with helium, demonstrated simultaneous pressure and temperature control during TVS operation. The simultaneous control was achieved by systematic injection of additional helium during each TVS cycle. Adding helium maintained the helium partial pressure as the liquid volume decreased because of TVS operation. The TVS demonstrations with liquid oxygen pressurized with helium were conducted with three different fluid-mixer configurations-a submerged axial jet mixer, a pair of spray hoops in the tank ullage, and combined use of the axial jet and spray hoops. A submerged liquid pump and compact heat exchanger located inside the test tank were used with all the mixer configurations. The initial series without helium and the final series with liquid nitrogen both used the axial jet mixer. The axial jet configuration successfully demonstrated the ability to control tank pressure; but in the normal-gravity environment, the temperature in the upper tank region (ullage and unwetted wall) was not controlled. The spray hoops and axial jet combination also successfully demonstrated pressure control as well as temperature control of the entire tank and contents. The spray-hoops-only configuration was not expected to be a reliable means of tank mixing because there was no direct means to produce liquid circulation. However, surprisingly good results also were obtained with the sprayhoops- only configuration (i.e., performance metrics such as cycle-averaged vent flowrate were similar to those obtained with the other configurations). A simple thermodynamic model was developed that correctly predicted the TVS behavior (temperature rise or pressure drop per TVS cycle) when helium was present in the ullage. The model predictions were correlated over a range of input parameters. The correlations show that temperature rise or pressure drop per cycle was proportional to both helium mole fraction and tank heat input. The response also depended on the tank fill fraction: the temperature rise or pressure drop (per TVS cycle) increased as the ullage volume decreased.
46 CFR 64.83 - Hydrostatic test.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 2 2012-10-01 2012-10-01 false Hydrostatic test. 64.83 Section 64.83 Shipping COAST... HANDLING SYSTEMS Periodic Inspections and Tests of MPTs § 64.83 Hydrostatic test. (a) The hydrostatic test..., removing tank insulation; (5) Filling the tank with water and pressurizing to the test pressure indicated...
NASA Technical Reports Server (NTRS)
Jarrett, T. W.
1972-01-01
Various space shuttle ascent configurations were tested in a trisonic wind tunnel to determine the aerodynamic characteristics. The ascent configuration consisted of a NASA/MSC 040 orbiter in combination with various HO centerline tank and booster geometries. The aerodynamic interference between components of the space shuttle and the effect on the orbiter aerodynamics was determined. The various aerodynamic configurations tested were: (1) centerline HO tanks T1 and T2, (2) centerline HO tank T3, and (3) centerline HO tank H4.
Findings from the X-33 Hydrogen Tank Failure Investigation
NASA Technical Reports Server (NTRS)
Niedermeyer, Melinda; Munafo, Paul M. (Technical Monitor)
2001-01-01
The X-33 Hydrogen tank failed during test in November of 1999 at MSFC. The tank completed the structural loading phase of the test successfully and was drained of hydrogen prior to the failure. The failure initiated in the acreage of Lobe 1 and was instantaneous, peeling the outer skin and core away from the inner skin. It was determined there were several factors that provided the opportunity for the tank to fail in this way. The factor giving life to these opportunistic circumstances was hydrogen infiltration into the core of the tank. The mechanism for this phenomenon will be discussed in this presentation.
49 CFR 179.300-16 - Tests of tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... air pressure test of at least 100 psig under conditions favorable to detection of any leakage. No... postweld heat treatment, tanks shall be subjected to hydrostatic expansion test in a water jacket, or by...
40 CFR 267.193 - What testing must I do?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.193 What testing must I do? You must test all new tanks and ancillary equipment...
40 CFR 267.193 - What testing must I do?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.193 What testing must I do? You must test all new tanks and ancillary equipment...
40 CFR 267.193 - What testing must I do?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.193 What testing must I do? You must test all new tanks and ancillary equipment...
40 CFR 267.193 - What testing must I do?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.193 What testing must I do? You must test all new tanks and ancillary equipment...
40 CFR 267.193 - What testing must I do?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.193 What testing must I do? You must test all new tanks and ancillary equipment...
Over-the-road testing of the instrumented tank car : a load environment study.
DOT National Transportation Integrated Search
2010-05-01
Fractures have been observed on stub sill tank cars for many years. Undetected and unattended, these fractures can develop into a variety of tank car failures. While tank car ruptures are relatively rare, the potential for a catastrophic HAZMAT relea...
Fluid-structure interaction analysis of the drop impact test for helicopter fuel tank.
Yang, Xianfeng; Zhang, Zhiqiang; Yang, Jialing; Sun, Yuxin
2016-01-01
The crashworthiness of helicopter fuel tank is vital to the survivability of the passengers and structures. In order to understand and improve the crashworthiness of the soft fuel tank of helicopter during the crash, this paper investigated the dynamic behavior of the nylon woven fabric composite fuel tank striking on the ground. A fluid-structure interaction finite element model of the fuel tank based on the arbitrary Lagrangian-Eulerian method was constructed to elucidate the dynamic failure behavior. The drop impact tests were conducted to validate the accuracy of the numerical simulation. Good agreement was achieved between the experimental and numerical results of the impact force with the ground. The influences of the impact velocity, the impact angle, the thickness of the fuel tank wall and the volume fraction of water on the dynamic responses of the dropped fuel tank were studied. The results indicated that the corner of the fuel tank is the most vulnerable location during the impact with ground.
Photogrammetry and Laser Imagery Tests for Tank Waste Volume Estimates: Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Field, Jim G.
2013-03-27
Feasibility tests were conducted using photogrammetry and laser technologies to estimate the volume of waste in a tank. These technologies were compared with video Camera/CAD Modeling System (CCMS) estimates; the current method used for post-retrieval waste volume estimates. This report summarizes test results and presents recommendations for further development and deployment of technologies to provide more accurate and faster waste volume estimates in support of tank retrieval and closure.
PRSA hydrogen tank thermal acoustic oscillation study
NASA Technical Reports Server (NTRS)
Riemer, D. H.
1979-01-01
The power reactant storage assembly (PRSA) hydrogen tank test data were reviewed. Two hundred and nineteen data points illustrating the effect of flow rate, temperature ratio and configuration were identified. The test data were reduced to produce the thermal acoustic oscillation parameters. Frequency and amplitude were determined for model correlation. A comparison of PRSA hydrogen tank test data with the analytical models indicated satisfactory agreement for the supply and poor agreement for the full line.
DOE Office of Scientific and Technical Information (OSTI.GOV)
SAMS TL; GUILLOT S
Scoping laboratory scale tests were performed at the Chemical Engineering Department of the Georgia Institute of Technology (Georgia Tech), and the Hanford 222-S Laboratory, involving double-shell tank (DST) and single-shell tank (SST) Hanford waste simulants. These tests established the viability of the Lithium Hydrotalcite precipitation process as a solution to remove aluminum and recycle sodium hydroxide from the Hanford tank waste, and set the basis of a validation test campaign to demonstrate a Technology Readiness Level of 3.
2007-12-30
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a team of external tank specialists from Lockheed Martin and the United Space Alliance undertakes the task of removing the hydrogen feed-through connector in support of space shuttle Atlantis' STS-122 mission. Here, a technician inspects the connector just removed from the external tank. Some of the tank's engine cutoff sensors, or ECO sensors, failed during propellant tanking for launch attempts on Dec. 6 and Dec. 9. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. After the data from additional testing on the connector is analyzed, shuttle program managers will decide on a forward plan. Launch of STS-122 is targeted for January 2008. Photo credit: NASA/George Shelton
2007-12-30
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a team of external tank specialists from Lockheed Martin and the United Space Alliance undertakes the task of removing the hydrogen feed-through connector in support of space shuttle Atlantis' STS-122 mission. Here, a technician demates the connector from the external tank. Some of the tank's engine cutoff sensors, or ECO sensors, failed during propellant tanking for launch attempts on Dec. 6 and Dec. 9. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. After the data from additional testing on the connector is analyzed, shuttle program managers will decide on a forward plan. Launch of STS-122 is targeted for January 2008. Photo credit: NASA/George Shelton
2007-12-30
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a team of external tank specialists from Lockheed Martin and the United Space Alliance undertakes the task of removing the hydrogen feed-through connector in support of space shuttle Atlantis' STS-122 mission. Here, a technician disconnects the connector before it is demated from the external tank. Some of the tank's engine cutoff sensors, or ECO sensors, failed during propellant tanking for launch attempts on Dec. 6 and Dec. 9. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. After the data from additional testing on the connector is analyzed, shuttle program managers will decide on a forward plan. Launch of STS-122 is targeted for January 2008. Photo credit: NASA/George Shelton
2007-12-29
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a team of external tank specialists from Lockheed Martin and the United Space Alliance undertakes the task of removing the hydrogen feed-through connector in support of space shuttle Atlantis' STS-122 mission. Here, a technician pulls the connector assembly, with its associated electrical harness, away from the tank. Some of the tank's engine cutoff sensors, or ECO sensors, failed during propellant tanking for launch attempts on Dec. 6 and Dec. 9. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. After the data from additional testing on the connector is analyzed, shuttle program managers will decide on a forward plan. Launch of STS-122 is targeted for January 2008. Photo credit: NASA/George Shelton
Wall mounted heat exchanger characterization. [cryogenic propellant tanks
NASA Technical Reports Server (NTRS)
Bullard, B. R.
1975-01-01
Analytical models are presented for describing the heat and mass transfer and the energy distribution in the contents of a cryogenic propellant tank, under varying gravity levels. These models are used to analytically evaluate the effectiveness of a wall heat exchanger as a means of controlling the pressure in the tank during flight and during fill operations. Pressure and temperature histories are presented for tanks varying in size from 4 to 22.5 feet in diameter and gravity levels from 0-1. Results from the subscale test program, utilizing both non-cryogenic and cryogenic fluid, designed to evaluate a tank wall heat exchanger are described and compared with the analytical models. Both the model and test results indicate that a passive tank wall heat exchanger can effectively control tank pressure. However, the weight of such a system is considerably higher than that of an active mixer system.
49 CFR 178.274 - Specifications for UN portable tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and 178.277, as applicable. Design type means a portable tank or series of portable tanks made of... the top of the shell during the hydraulic pressure test equal to not less than 1.5 times the design... be designed and constructed to withstand a hydraulic test pressure of not less than 1.5 times the...
49 CFR 178.274 - Specifications for UN portable tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... and 178.277, as applicable. Design type means a portable tank or series of portable tanks made of... the top of the shell during the hydraulic pressure test equal to not less than 1.5 times the design... be designed and constructed to withstand a hydraulic test pressure of not less than 1.5 times the...
49 CFR 180.407 - Requirements for test and inspection of specification cargo tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... dents, cuts, gouges, corroded or abraded areas, leakage, or any other condition that might render it... accordance with the criteria prescribed in § 180.411. Any signs of leakage must be repaired in accordance...: All lined cargo tanks transporting lading corrosive to the tank September 1, 1991 1 year. Leakage Test...
Unlined Reuseable Filament Wound Composite Cryogenic Tank Testing
NASA Technical Reports Server (NTRS)
Murphy, A. W.; Lake, R. E.; Wilkerson, C.
1999-01-01
An unlined reusable filament wound composite cryogenic tank was tested at the Marshall Space Flight Center using LH2 cryogen and pressurization to 320 psig. The tank was fabricated by Phillips Laboratory and Wilson Composite Group, Inc., using an EnTec five-axis filament winder and sand mandrels. The material used was IM7/977-2 (graphite/epoxy).
Yang, JaeWon; Hodax, Jonathan D.; Machan, Jason T.; Secrist, Eric S.; Durand, Wesley M.; Owens, Brett D.; Eltorai, Adam E.M.; Dodson, Christopher C.
2017-01-01
Background: Anterior cruciate ligament (ACL) injuries pose a significant risk to the careers of players in the National Football League (NFL). The relationships between draft round and position on return to play (RTP) among NFL players are not well understood, and the ability to return to preinjury performance levels remains unknown for most positions. Purpose: To test for differences in RTP rates and changes in performance after an ACL injury by position and draft round. We hypothesized that skilled positions would return at a lower rate compared to unskilled positions. We further hypothesized that early draft-round status would relate to a greater rate of RTP and that skilled positions and a lower draft round would correlate with decreased performance for players who return to sport. Study Design: Case-control study; Level of evidence, 3. Methods: Utilizing a previously established database of publicly available information regarding ACL tears among NFL players, athletes with ACL tears occurring between the 2010 and 2013 seasons were identified. Generalized linear models and Kaplan-Meier time-to-event models were used to test the study hypotheses. Results: The overall RTP rate was 61.7%, with skilled players and unskilled players returning at rates of 64.1% and 60.4%, respectively (P = .74). Early draft-round players and unskilled late draft-round players had greater rates of RTP compared to skilled late draft-round players and both unskilled and skilled undrafted free agents (UDFAs). Skilled early draft-round players constituted the only cohort that played significantly fewer games after an injury. Unskilled UDFAs constituted the only cohort to show a significant increase in the number of games started and ratio of games started to games played, starting more games in which they played, after an injury. Conclusion: Early draft-round and unskilled players were more likely to return compared to their later draft-round and skilled peers. Skilled early draft-round players, who displayed relatively high rates of RTP, constituted the only cohort to show a decline in performance. Unskilled UDFAs, who exhibited relatively low rates of RTP, constituted the only cohort to show an increase in performance. The significant effect of draft round and position type on RTP may be caused by a combination of differences in talent levels and in opportunities given to returning to play. PMID:28975136
Defect Characterization in a Thin Walled Composite RP-1 Tank: A Case Study
NASA Technical Reports Server (NTRS)
Langsing, Matthew D.; Walker, James L., II; Russell, Samual S.
2000-01-01
A full scale thin walled composite tank, designed and fabricated for the storage of pressurized RP- I rocket fuel, was fully inspected with digital infrared thermography (IR) during assembly and prior to proof testing. The tank featured a "pill capsule" design with the equatorial bondline being overwrapped on both the inner and outer surfaces. A composite skirt was bonded to the aft dome of the tank to serve as a structural support when the tank was stood on end in service. Numerous anomalies were detected and mapped prior to proof testing, some along bondlines and some scattered throughout the acreage. After the tank was intentionally burst, coupons were cut from the regions including thermographic anomalies. These coupons were again inspected thermographically to document the growth of any indications due to proof testing. Ultrasonic inspections (UT) were also performed on the coupons for comparison to thermography. Several coupons were dissected and micrographed. Relationships between IR and UT indications and the physical nature of the dissected material are presented.
NASA Astrophysics Data System (ADS)
Plachta, D. W.; Johnson, W. L.; Feller, J. R.
2016-03-01
Cryogenic propellants such as liquid hydrogen (LH2) and liquid oxygen (LO2) are a part of NASA's future space exploration plans due to their high specific impulse for rocket motors of upper stages. However, the low storage temperatures of LH2 and LO2 cause substantial boil-off losses for long duration missions. These losses can be eliminated by incorporating high performance cryocooler technology to intercept heat load to the propellant tanks and modulating the cryocooler temperature to control tank pressure. The technology being developed by NASA is the reverse turbo-Brayton cycle cryocooler and its integration to the propellant tank through a distributed cooling tubing network coupled to the tank wall. This configuration was recently tested at NASA Glenn Research Center in a vacuum chamber and cryoshroud that simulated the essential thermal aspects of low Earth orbit, its vacuum and temperature. This test series established that the active cooling system integrated with the propellant tank eliminated boil-off and robustly controlled tank pressure.
2007-12-30
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a team of external tank specialists from Lockheed Martin and the United Space Alliance undertakes the task of removing the hydrogen feed-through connector in support of space shuttle Atlantis' STS-122 mission. Here, technicians place the wrapped connector in a shipping container for transport to NASA's Marshall Space Flight Center in Huntsville, Ala., for further cryogenic testing. Some of the tank's engine cutoff sensors, or ECO sensors, failed during propellant tanking for launch attempts on Dec. 6 and Dec. 9. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. After the data from additional testing on the connector is analyzed, shuttle program managers will decide on a forward plan. Launch of STS-122 is targeted for January 2008. Photo credit: NASA/George Shelton
2007-12-30
KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a team of external tank specialists from Lockheed Martin and the United Space Alliance undertakes the task of removing the hydrogen feed-through connector in support of space shuttle Atlantis' STS-122 mission. Here, a technician carries the shipping container in which the wrapped connector is secured for transport to NASA's Marshall Space Flight Center in Huntsville, Ala., for further cryogenic testing. Some of the tank's engine cutoff sensors, or ECO sensors, failed during propellant tanking for launch attempts on Dec. 6 and Dec. 9. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside. After the data from additional testing on the connector is analyzed, shuttle program managers will decide on a forward plan. Launch of STS-122 is targeted for January 2008. Photo credit: NASA/George Shelton
NASA Technical Reports Server (NTRS)
Plachta, D. W.; Johnson, W. L.; Feller, J. R.
2015-01-01
Cryogenic propellants such as liquid hydrogen (LH2) and liquid oxygen (LO2) are a part of NASA's future space exploration plans due to their high specific impulse for rocket motors of upper stages. However, the low storage temperatures of LH2 and LO2 cause substantial boil-off losses for long duration missions. These losses can be eliminated by incorporating high performance cryocooler technology to intercept heat load to the propellant tanks and modulating the cryocooler temperature to control tank pressure. The technology being developed by NASA is the reverse turbo-Brayton cycle cryocooler and its integration to the propellant tank through a distributed cooling tubing network coupled to the tank wall. This configuration was recently tested at NASA Glenn Research Center in a vacuum chamber and cryoshroud that simulated the essential thermal aspects of low Earth orbit, its vacuum and temperature. This test series established that the active cooling system integrated with the propellant tank eliminated boil-off and robustly controlled tank pressure.
Development of a Pressure Box to Evaluate Reusable-Launch-Vehicle Cryogenic-Tank Panels
NASA Technical Reports Server (NTRS)
Ambur, Damodar R.; Sikora, Joseph; Maguire, James F.; Winn, Peter M.
1996-01-01
A cryogenic pressure-box test machine has been designed and is being developed to test full-scale reusable-launch-vehicle cryogenic-tank panels. This machine is equipped with an internal pressurization system, a cryogenic cooling system, and a heating system to simulate the mechanical and thermal loading conditions that are representative of a reusable-launch-vehicle mission profile. The cryogenic cooling system uses liquid helium and liquid nitrogen to simulate liquid hydrogen and liquid oxygen tank internal temperatures. A quartz lamp heating system is used for heating the external surface of the test panels to simulate cryogenic-tank external surface temperatures during re-entry of the launch vehicle. The pressurization system uses gaseous helium and is designed to be controlled independently of the cooling system. The tensile loads in the axial direction of the test panel are simulated by means of hydraulic actuators and a load control system. The hoop loads in the test panel are reacted by load-calibrated turnbuckles attached to the skin and frame elements of the test panel. The load distribution in the skin and frames can be adjusted to correspond to the tank structure by using these turnbuckles. The seal between the test panel and the cryogenic pressure box is made from a reinforced Teflon material which can withstand pressures greater than 52 psig at cryogenic temperatures. Analytical results and tests on prototype test components indicate that most of the cryogenic-tank loading conditions that occur in flight can be simulated in the cryogenic pressure-box test machine.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roring, J; Saenz, D; Cruz, W
2015-06-15
Purpose: The commissioning criteria of water tank phantoms are essential for proper accuracy and reproducibility in a clinical setting. This study outlines the results of mechanical and dosimetric testing between PTW MP3-M water tank system and the Standard Imaging Doseview 3D water tank system. Methods: Measurements were taken of each axis of movement on the tank using 30 cm calipers at 1, 5, 10, 50, 100, and 200 mm for accuracy and reproducibility of tank movement. Dosimetric quantities such as percent depth dose and dose profiles were compared between tanks using a 6 MV beam from a Varian 23EX LINAC.more » Properties such as scanning speed effects, central axis depth dose agreement with static measurements, reproducibility of measurements, symmetry and flatness, and scan time between tanks were also investigated. Results: Results showed high geometric accuracy within 0.2 mm. Central axis PDD and in-field profiles agreed within 0.75% between the tanks. These outcomes test many possible discrepancies in dose measurements across the two tanks and form a basis for comparison on a broader range of tanks in the future. Conclusion: Both 3D water scanning phantoms possess a high degree of spatial accuracy, allowing for equivalence in measurements regardless of the phantom used. A commissioning procedure when changing water tanks or upon receipt of a new tank is nevertheless critical to ensure consistent operation before and after the arrival of new hardware.« less
3. EAST SIDE, ALSO SHOWING COVERED TANKS AND TEST STAND ...
3. EAST SIDE, ALSO SHOWING COVERED TANKS AND TEST STAND 1-5 AT RIGHT. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-4, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
Tank bromeliad water: Similar or distinct environments for research of bacterial bioactives?
Carmo, F.L.; Santos, H.F.; Peixoto, R.S.; Rosado, A.S.; Araujo, F.V.
2014-01-01
The Atlantic Rainforest does not have a uniform physiognomy, its relief determines different environmental conditions that define the composition of its flora and fauna. Within this ecosystem, bromeliads that form tanks with their leaves hold water reservoirs throughout the year, maintaining complex food chains, based mainly on autotrophic and heterotrophic bacteria. Some works concluded that the water held by tank bromeliads concentrate the microbial diversity of their ecosystem. To investigate the bacterial diversity and the potential biotechnology of these ecosystems, tank bromeliads of the Neoregelia cruenta species from the Atlantic Rainforest in Brazil were used as models for this research. Bacteria isolated from these models were tested for production of bioactive compounds. DGGE of the water held by tank bromeliads was performed in different seasons, locations and sun exposure to verify whether these environmental factors affect bacterial communities. The DGGE bands profile showed no grouping of bacterial community by the environmental factors tested. Most of the isolates demonstrated promising activities in the tests performed. Collectively, these results suggest that tank bromeliads of the N. cruenta species provide important habitats for a diverse microbial community, suggesting that each tank forms a distinct micro-habitat. These tanks can be considered excellent sources for the search for new enzymes and/or new bioactive composites of microbial origin. PMID:24948929
Tank bromeliad water: similar or distinct environments for research of bacterial bioactives?
Carmo, F L; Santos, H F; Peixoto, R S; Rosado, A S; Araujo, F V
2014-01-01
The Atlantic Rainforest does not have a uniform physiognomy, its relief determines different environmental conditions that define the composition of its flora and fauna. Within this ecosystem, bromeliads that form tanks with their leaves hold water reservoirs throughout the year, maintaining complex food chains, based mainly on autotrophic and heterotrophic bacteria. Some works concluded that the water held by tank bromeliads concentrate the microbial diversity of their ecosystem. To investigate the bacterial diversity and the potential biotechnology of these ecosystems, tank bromeliads of the Neoregelia cruenta species from the Atlantic Rainforest in Brazil were used as models for this research. Bacteria isolated from these models were tested for production of bioactive compounds. DGGE of the water held by tank bromeliads was performed in different seasons, locations and sun exposure to verify whether these environmental factors affect bacterial communities. The DGGE bands profile showed no grouping of bacterial community by the environmental factors tested. Most of the isolates demonstrated promising activities in the tests performed. Collectively, these results suggest that tank bromeliads of the N. cruenta species provide important habitats for a diverse microbial community, suggesting that each tank forms a distinct micro-habitat. These tanks can be considered excellent sources for the search for new enzymes and/or new bioactive composites of microbial origin.
VOLUMETRIC LEAK DETECTION IN LARGE UNDERGROUND STORAGE TANKS - VOLUME I
A set of experiments was conducted to determine whether volumetric leak detection system presently used to test underground storage tanks (USTs) up to 38,000 L (10,000 gal) in capacity could meet EPA's regulatory standards for tank tightness and automatic tank gauging systems whe...
Overview of Hanford Single Shell Tank (SST) Structural Integrity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rast, Richard S.; Washenfelder, Dennis J.; Johnson, Jeremy M.
2013-11-14
To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration, Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for themore » Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The structural integrity of the tanks is a key element in completing the cleanup mission at the Hanford Site. There are eight primary recommendations related to the structural integrity of Hanford Single-Shell Tanks. Six recommendations are being implemented through current and planned activities. The structural integrity of the Hanford is being evaluated through analysis, monitoring, inspection, materials testing, and construction document review. Structural evaluation in the form of analysis is performed using modern finite element models generated in ANSYS. The analyses consider in-situ, thermal, operating loads and natural phenomena such as earthquakes. Structural analysis of 108 of 149 Hanford Single-Shell Tanks has concluded that the tanks are structurally sound and meet current industry standards. Analysis of the remaining Hanford Single-Shell Tanks is scheduled for FY2014. Hanford Single-Shell Tanks are monitored through a dome deflection program. The program looks for deflections of the tank dome greater than 1/4 inch. No such deflections have been recorded. The tanks are also subjected to visual inspection. Digital cameras record the interior surface of the concrete tanks, looking for cracks and other surface conditions that may indicate signs of structural distress. The condition of the concrete and rebar of the Hanford Single-Shell Tanks is currently being tested and planned for additional activities in the near future. Concrete and rebar removed from the dome of a 65 year old tank was tested for mechanics properties and condition. Results indicated stronger than designed concrete with additional Petrographic examination and rebar completed. Material properties determined from previous efforts combined with current testing and construction document review will help to generate a database that will provide indication of Hanford Single-Shell Tank structural integrity.« less
In-flight and simulated aircraft fuel temperature measurements
NASA Technical Reports Server (NTRS)
Svehla, Roger A.
1990-01-01
Fuel tank measurements from ten flights of an L1011 commercial aircraft are reported for the first time. The flights were conducted from 1981 to 1983. A thermocouple rake was installed in an inboard wing tank and another in an outboard tank. During the test periods of either 2 or 5 hr, at altitudes of 10,700 m (35,000 ft) or higher, either the inboard or the outboard tank remained full. Fuel temperature profiles generally developed in the expected manner. The bulk fuel was mixed by natural convection to a nearly uniform temperature, especially in the outboard tank, and a gradient existed at the bottom conduction zone. The data indicated that when full, the upper surface of the inboard tank was wetted and the outboard tank was unwetted. Companion NASA Lewis Research Center tests were conducted in a 0.20 cubic meter (52 gal) tank simulator of the outboard tank, chilled on the top and bottom, and insulated on the sides. Even though the simulator tank had no internal components corresponding to the wing tank, temperatures agreed with the flight measurements for wetted upper surface conditions, but not for unwetted conditions. It was concluded that if boundary conditions are carefully controlled, simulators are a useful way of evaluating actual flight temperatures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curley, C.C.; Overas, A.J.
1976-01-01
The design and performance of the variable-pitch axial-flow forced-draft and induced-draft fans used in two 820MW generating units at the Martins Creek Power Plant are described. Information is included on fan design; silencers; mechanical and metallurgical testing; insulation; performance testing; start-up and shutdown procedures; and maintenance. (LCL)
ERIC Educational Resources Information Center
Flores, Alina L.; Prue, Christine E.; Panissidi, Paula
2010-01-01
Objective: This article presents the results of testing draft folic acid educational materials with key gatekeepers, leading to the development of a Spanish-language print advertisement, poster, and radio public service announcement (PSA) aimed at promoting folic acid consumption among 18- to 25-year-old young Latina adults, as well as a…
Chen, Jia-Kun; Huang, Rong Fung; Peng, Kuan-Lin
2012-01-01
The effects of draft on the flow and spillage characteristics of wall-mounted and jet-isolated range hoods were investigated. A specially designed draft generator that could supply low-swirl air current was used to provide "cross draft" from three directions, lateral (θ = 0(o)), oblique (θ = 45(o)), and front (θ = 90(o)), with respect to the center point of the range hoods. Flow characteristics of oil mist were inspected through visualization of smoke flows with light scattering (laser light sheet-assisted visualization of smoke flow). The leakage mechanisms, which were closely related to the flow features, were studied by examining both movies and still pictures showing smoke-flow evolution. The sulfur hexafluoride tracer gas concentration detection method was employed to measure the capture indices. The results showed that the lateral draft pushed the pollutants generated under the hood in the opposite direction and induced serious spillage. The oblique draft pushed the pollutants toward both the rear wall and opposite side and induced more serious spillage than did the lateral draft. The frontal draft forced the pollutants to bifurcate into streams moving toward the left and the right, and induced the most serious pollutant spillage among the three tested drafts. Pollutant spillage became critically significant as the cross draft velocity was increased to greater than 0.2 m/sec. Spillage of pollutants increased as the velocity of the cross draft was increased. Increasing the suction flow rate of the range hood may increase resistance to the draft, but the benefits were limited at draft velocities greater than 0.2 m/sec. Both range hoods had a similarly low capture index under the influence of the lateral draft. For the oblique and frontal drafts, the jet-isolated range hood demonstrated a higher capture index than did the wall-mounted range hood.
Detailed studies of aviation fuel flowability
NASA Technical Reports Server (NTRS)
Mehta, H. K.; Armstrong, R. S.
1985-01-01
Six Jet A fuels, with varying compositions, were tested for low temperature flowability in a 190-liter simulator tank that modeled a section of a wing tank of a wide-body commercial airplane. The insulated tank was chilled by circulating coolant through the upper and lower surfaces. Flow-ability was determined as a function of fuel temperature by holdup, the fraction of unflowable fuel remaining in the tank after otherwise complete withdrawal. In static tests with subfreezing tank conditions, hold up varied with temperature and fuel composition. However, a general correlation of two or three classes of fuel type was obtained by plotting holdup as a function of the difference between freezing point and boundary-layer temperature, measured 0.6 cm above the bottom tank surface. Dynamic conditions of vibrations and slosh or rate of fuel withdrawal had very minor effects on holdup. Tests with cooling schedules to represent extreme, cold-day flights showed, at most, slight holdup for any combination of fuel type or dynamic conditions. Tests that superimposed external fuel heating and recirculation during the cooldown period indicates reduced hold up by modification of the low-temperature boundary layer. Fuel heating was just as effective when initiated during the later times of the tests as when applied continuously.
Testing and Fielding of the Panther Tank and Lessons for Force XXI
1997-01-01
decided that the following solution be adopted: the construction of the Tiger Tank , a tank of some 60 tons, which had recently been started would...to minimize the German advantages of the Panther. The Russians learned quickly that charging at the new Panthers (and Tiger tanks as well), and then...vehicle powerful enough to pull a Panther was another Panther or a Tiger tank . Without another tank stopping to retrieve the disabled vehicle, the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reynolds, D.A.
1997-04-04
New data on tank 241-C-106 were obtained from grab sampling and from compatibility testing of tank C-106 and tank AY-102 wastes. All chemistry-associated and other compatibility Information compiled in this report strongly suggests that the sluicing of the contents of tank C-106, in accord with appropriate controls, will pose no unacceptable risk to workers, public safety, or the environment. In addition, it is expected that the sluicing operation will successfully resolve the High-Heat Safety Issue for tank C-106.
NASA Technical Reports Server (NTRS)
Hanna, Gregory J.; Stephens, Craig A.
1991-01-01
A two dimensional finite difference thermal model was developed to predict the effects of heating profile, fill level, and cryogen type prior to experimental testing the Generic Research Cryogenic Tank (GRCT). These numerical predictions will assist in defining test scenarios, sensor locations, and venting requirements for the GRCT experimental tests. Boiloff rates, tank-wall and fluid temperatures, and wall heat fluxes were determined for 20 computational test cases. The test cases spanned three discrete fill levels and three heating profiles for hydrogen and nitrogen.
2017-12-08
NASA Kennedy Space Center's Engineering Director Pat Simpkins, at left, talks with Michael E. Johnson, a project engineer; and Emilio Cruz, deputy division chief in the Laboratories, Development and Testing Division, inside the Prototype Development Laboratory. A banner signing event was held to mark the successful delivery of a liquid oxygen test tank, called Tardis. Engineers and technicians worked together to develop the tank and build it at the lab to support cryogenic testing at Johnson Space Center's White Sands Test Facility in Las Cruces, New Mexico. The 12-foot-tall, 3,810-pound aluminum tank will be shipped to White Sands for testing.
46 CFR 91.25-37 - Tanks containing dangerous cargoes.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Tanks containing dangerous cargoes. 91.25-37 Section 91... VESSELS INSPECTION AND CERTIFICATION Inspection for Certification § 91.25-37 Tanks containing dangerous cargoes. (a) For inspection and tests of tanks containing certain dangerous cargoes in bulk, see part 98...
46 CFR 91.25-37 - Tanks containing dangerous cargoes.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Tanks containing dangerous cargoes. 91.25-37 Section 91... VESSELS INSPECTION AND CERTIFICATION Inspection for Certification § 91.25-37 Tanks containing dangerous cargoes. (a) For inspection and tests of tanks containing certain dangerous cargoes in bulk, see part 98...
46 CFR 91.25-37 - Tanks containing dangerous cargoes.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Tanks containing dangerous cargoes. 91.25-37 Section 91... VESSELS INSPECTION AND CERTIFICATION Inspection for Certification § 91.25-37 Tanks containing dangerous cargoes. (a) For inspection and tests of tanks containing certain dangerous cargoes in bulk, see part 98...
46 CFR 91.25-37 - Tanks containing dangerous cargoes.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Tanks containing dangerous cargoes. 91.25-37 Section 91... VESSELS INSPECTION AND CERTIFICATION Inspection for Certification § 91.25-37 Tanks containing dangerous cargoes. (a) For inspection and tests of tanks containing certain dangerous cargoes in bulk, see part 98...
46 CFR 91.25-37 - Tanks containing dangerous cargoes.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Tanks containing dangerous cargoes. 91.25-37 Section 91... VESSELS INSPECTION AND CERTIFICATION Inspection for Certification § 91.25-37 Tanks containing dangerous cargoes. (a) For inspection and tests of tanks containing certain dangerous cargoes in bulk, see part 98...
49 CFR 179.16 - Tank-head puncture-resistance systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CARS General Design Requirements § 179.16 Tank-head puncture-resistance systems. (a) Performance...; and (3) The impacted tank car is pressurized to at least 6.9 Bar (100 psig). (b) Verification by... design and test requirements of the full-head protection (shields) or full tank-head jackets must meet...
49 CFR 193.2623 - Inspecting LNG storage tanks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Inspecting LNG storage tanks. 193.2623 Section 193... GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2623 Inspecting LNG storage tanks. Each LNG storage tank must be inspected or tested to verify that each of the following conditions does not impair...
49 CFR 193.2623 - Inspecting LNG storage tanks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Inspecting LNG storage tanks. 193.2623 Section 193... GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2623 Inspecting LNG storage tanks. Each LNG storage tank must be inspected or tested to verify that each of the following conditions does not impair...
49 CFR 193.2623 - Inspecting LNG storage tanks.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Inspecting LNG storage tanks. 193.2623 Section 193... GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2623 Inspecting LNG storage tanks. Each LNG storage tank must be inspected or tested to verify that each of the following conditions does not impair...
TEMPEST code modifications and testing for erosion-resisting sludge simulations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Onishi, Y.; Trent, D.S.
The TEMPEST computer code has been used to address many waste retrieval operational and safety questions regarding waste mobilization, mixing, and gas retention. Because the amount of sludge retrieved from the tank is directly related to the sludge yield strength and the shear stress acting upon it, it is important to incorporate the sludge yield strength into simulations of erosion-resisting tank waste retrieval operations. This report describes current efforts to modify the TEMPEST code to simulate pump jet mixing of erosion-resisting tank wastes and the models used to test for erosion of waste sludge with yield strength. Test results formore » solid deposition and diluent/slurry jet injection into sludge layers in simplified tank conditions show that the modified TEMPEST code has a basic ability to simulate both the mobility and immobility of the sludges with yield strength. Further testing, modification, calibration, and verification of the sludge mobilization/immobilization model are planned using erosion data as they apply to waste tank sludges.« less
Damage detection in hazardous waste storage tank bottoms using ultrasonic guided waves
NASA Astrophysics Data System (ADS)
Cobb, Adam C.; Fisher, Jay L.; Bartlett, Jonathan D.; Earnest, Douglas R.
2018-04-01
Detecting damage in storage tanks is performed commercially using a variety of techniques. The most commonly used inspection technologies are magnetic flux leakage (MFL), conventional ultrasonic testing (UT), and leak testing. MFL and UT typically involve manual or robotic scanning of a sensor along the metal surfaces to detect cracks or corrosion wall loss. For inspection of the tank bottom, however, the storage tank is commonly emptied to allow interior access for the inspection system. While there are costs associated with emptying a storage tank for inspection that can be justified in some scenarios, there are situations where emptying the tank is impractical. Robotic, submersible systems have been developed for inspecting these tanks, but there are some storage tanks whose contents are so hazardous that even the use of these systems is untenable. Thus, there is a need to develop an inspection strategy that does not require emptying the tank or insertion of the sensor system into the tank. This paper presents a guided wave system for inspecting the bottom of double-shelled storage tanks (DSTs), with the sensor located on the exterior side-wall of the vessel. The sensor used is an electromagnetic acoustic transducer (EMAT) that generates and receives shear-horizontal guided plate waves using magnetostriction principles. The system operates by scanning the sensor around the circumference of the storage tank and sending guided waves into the tank bottom at regular intervals. The data from multiple locations are combined using the synthetic aperture focusing technique (SAFT) to create a color-mapped image of the vessel thickness changes. The target application of the system described is inspection of DSTs located at the Hanford site, which are million-gallon vessels used to store nuclear waste. Other vessels whose exterior walls are accessible would also be candidates for inspection using the described approach. Experimental results are shown from tests on multiple mockups of the DSTs being used to develop the sensor system.
Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mayhorn, Ebony T.; Sullivan, Greg P.; Petersen, Joseph M.
2015-09-29
This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.
Cost-Efficient Storage of Cryogens
NASA Technical Reports Server (NTRS)
Fesmire, J. E.; Sass, J. P.; Nagy, Z.; Sojoumer, S. J.; Morris, D. L.; Augustynowicz, S. D.
2007-01-01
NASA's cryogenic infrastructure that supports launch vehicle operations and propulsion testing is reaching an age where major refurbishment will soon be required. Key elements of this infrastructure are the large double-walled cryogenic storage tanks used for both space vehicle launch operations and rocket propulsion testing at the various NASA field centers. Perlite powder has historically been the insulation material of choice for these large storage tank applications. New bulk-fill insulation materials, including glass bubbles and aerogel beads, have been shown to provide improved thermal and mechanical performance. A research testing program was conducted to investigate the thermal performance benefits as well as to identify operational considerations and associated risks associated with the application of these new materials in large cryogenic storage tanks. The program was divided into three main areas: material testing (thermal conductivity and physical characterization), tank demonstration testing (liquid nitrogen and liquid hydrogen), and system studies (thermal modeling, economic analysis, and insulation changeout). The results of this research work show that more energy-efficient insulation solutions are possible for large-scale cryogenic storage tanks worldwide and summarize the operational requirements that should be considered for these applications.
Scaled Tank Test Design and Results for the Aquantis 2.5 MW Ocean Current Generation Device
Swales, Henry; Kils, Ole; Coakley, David B.; Sites, Eric; Mayer, Tyler
2015-06-03
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Rig Structural Analysis Results. This is the detailed documentation for scaled device testing in a tow tank, including models, drawings, presentations, cost of energy analysis, and structural analysis. This dataset also includes specific information on drivetrain, roller bearing, blade fabrication, mooring, and rotor characteristics.
Vented Tank Resupply Experiment Demonstrated Vane Propellant Management Device for Fluid Transfer
NASA Technical Reports Server (NTRS)
Chato, David J.
1998-01-01
The Vented Tank Resupply Experiment (VTRE) flown on STS-77 confirmed the design approaches presently used in the development of vane-type propellant management devices (PMD) for use in resupply and tank-venting situations, and it provided the first practical demonstration of an autonomous fluid transfer system. All the objectives were achieved. Transfers were more stable than drop tower testing indicated. Liquid was retained successfully at the highest flow rate tested (2.73 gal/min), demonstrating that rapid fills could be achieved. Liquid-free vents were achieved for two different tanks, although the flow rate was higher for the spherical tank (0.1591 cu ft/min) than for the tank with a short barrel section (0.0400 cu ft/min). Recovery from a thruster firing, which moved the liquid to the opposite end of the tank from the PMD, was achieved in 30 sec, showing that liquid rewicked more quickly into the PMD after thruster firing than pretest projections had predicted. In addition, researchers obtained great insights into the PMD behavior from the video footage provided, and discovered new considerations for future PMD designs that would not have been seen without this flight test.
Vibration Considerations for Cryogenic Tanks Using Glass Bubbles Insulation
NASA Technical Reports Server (NTRS)
Werlink, Rudolph J.; Fesmire, James E.; Sass, Jared P.
2011-01-01
The use of glass bubbles as an efficient and practical thermal insulation system has been previously demonstrated in cryogenic storage tanks. One such example is a spherical, vacuum-jacketed liquid hydrogen vessel of 218,000 liter capacity where the boiloff rate has been reduced by approximately 50 percent. Further applications may include non-stationary tanks such as mobile tankers and tanks with extreme duty cycles or exposed to significant vibration environments. Space rocket launch events and mobile tanker life cycles represent two harsh cases of mechanical vibration exposure. A number of bulk fill insulation materials including glass bubbles, perlite powders, and aerogel granules were tested for vibration effects and mechanical behavior using a custom design holding fixture subjected to random vibration on an Electrodynamic Shaker. The settling effects for mixtures of insulation materials were also investigated. The vibration test results and granular particle analysis are presented with considerations and implications for future cryogenic tank applications. A thermal performance update on field demonstration testing of a 218,000 L liquid hydrogen storage tank, retrofitted with glass bubbles, is presented. KEYWORDS: Glass bubble, perlite, aerogel, insulation, liquid hydrogen, storage tank, mobile tanker, vibration.
Burr, Jaime F; Jamnik, Roni K; Baker, Joseph; Macpherson, Alison; Gledhill, Norman; McGuire, E J
2008-09-01
The primary purpose of this study was to determine the fitness variables with the highest capability for predicting hockey playing potential at the elite level as determined by entry draft selection order. We also examined the differences associated with the predictive abilities of the test components among playing positions. The secondary purpose of this study was to update the physiological profile of contemporary hockey players including positional differences. Fitness test results conducted by our laboratory at the National Hockey League Entry Draft combine were compared with draft selection order on a total of 853 players. Regression models revealed peak anaerobic power output to be important for higher draft round selection in all positions; however, the degree of importance of this measurement varied with playing position. The body index, which is a composite score of height, lean mass, and muscular development, was similarly important in all models, with differing influence by position. Removal of the goalies' data increased predictive capacity, suggesting that talent identification using physical fitness testing of this sort may be more appropriate for skating players. Standing long jump was identified as a significant predictor variable for forwards and defense and could be a useful surrogate for assessing overall hockey potential. Significant differences exist between the physiological profiles of current players based on playing position. There are also positional differences in the relative importance of anthropometric and fitness measures of off-ice hockey tests in relation to draft order. Physical fitness measures and anthropometric data are valuable in helping predict hockey playing potential. Emphasis on anthropometry should be used when comparing elite-level forwards, whereas peak anaerobic power and fatigue rate are more useful for differentiating between defense.
Cryogenic glass-filament-wound tank evaluation
NASA Technical Reports Server (NTRS)
Morris, E. E.; Landes, R. E.
1971-01-01
High-pressure glass-filament-wound fluid storage vessels with thin aluminum liners were designed, fabricated, and tested at ambient and cryogenic temperatures which demonstrated the feasibility of producing such vessels as well as high performance and light weight. Significant developments and advancements were made in solving problems associated with the thin metal liners in the tanks, including liner bonding to the overwrap and high strain magnification at the vessel polar bosses. The vessels had very high burst strengths, and failed in cyclic fatigue tests by local liner fracture and leakage without structural failure of the composite tank wall. The weight of the tanks was only 40 to 55% of comparable 2219-T87 aluminum and Inconel 718 tanks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
RIECK, C.A.
1999-02-25
The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTS) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operations (DOO) defines the control philosophy for the waste retrieval system for tanks 241-AP-102 (AP-102) and 241-AP-104 (AP-104). This DOO will provide a basis for the detailed design of the Retrieval Control System (RCS) for AP-102 and AP-104 and establishes test criteria for the RCS. The test criteria will be usedmore » during qualification testing and acceptance testing to verify operability.« less
1979-08-21
Appendix s - Outline and Draft Material for Proposed Triservice Interim Guideline on Application of Software Acceptance Criteria....... 269 Appendix 9...AND DRAFT MATERIAL FOR PROPOSED TRISERVICE INTERIM GUIDELINE ON APPLICATION OF SOFTWARE ACCEPTANCE CRITERIA I I INTRODUCTION The purpose of this guide...contract item (CPCI) (code) 5. CPCI test plan 6. CPCI test procedures 7. CPCI test report 8. Handbooks and manuals. Al though additional material does
NASA Technical Reports Server (NTRS)
Majumdar, Alok
2013-01-01
The purpose of the paper is to present the analytical capability developed to model no vent chill and fill of cryogenic tank to support CPST (Cryogenic Propellant Storage and Transfer) program. Generalized Fluid System Simulation Program (GFSSP) was adapted to simulate charge-holdvent method of Tank Chilldown. GFSSP models were developed to simulate chilldown of LH2 tank in K-site Test Facility and numerical predictions were compared with test data. The report also describes the modeling technique of simulating the chilldown of a cryogenic transfer line and GFSSP models were developed to simulate the chilldown of a long transfer line and compared with test data.
Tank System Integrated Model: A Cryogenic Tank Performance Prediction Program
NASA Technical Reports Server (NTRS)
Bolshinskiy, L. G.; Hedayat, A.; Hastings, L. J.; Sutherlin, S. G.; Schnell, A. R.; Moder, J. P.
2017-01-01
Accurate predictions of the thermodynamic state of the cryogenic propellants, pressurization rate, and performance of pressure control techniques in cryogenic tanks are required for development of cryogenic fluid long-duration storage technology and planning for future space exploration missions. This Technical Memorandum (TM) presents the analytical tool, Tank System Integrated Model (TankSIM), which can be used for modeling pressure control and predicting the behavior of cryogenic propellant for long-term storage for future space missions. Utilizing TankSIM, the following processes can be modeled: tank self-pressurization, boiloff, ullage venting, mixing, and condensation on the tank wall. This TM also includes comparisons of TankSIM program predictions with the test data andexamples of multiphase mission calculations.
49 CFR 179.200-23 - Tests of pressure relief valves.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200...
14 CFR 29.965 - Fuel tank tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the reaction of the contents, with the tank full, during maximum limit acceleration or emergency... motion about more than one axis is likely to be critical, the tank must be rocked about each critical...
14 CFR 29.965 - Fuel tank tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the reaction of the contents, with the tank full, during maximum limit acceleration or emergency... motion about more than one axis is likely to be critical, the tank must be rocked about each critical...
Spray sealing: A breakthrough in integral fuel tank sealing technology
NASA Astrophysics Data System (ADS)
Richardson, Martin D.; Zadarnowski, J. H.
1989-11-01
In a continuing effort to increase readiness, a new approach to sealing integral fuel tanks is being developed. The technique seals potential leak sources by spraying elastomeric materials inside the tank cavity. Laboratory evaluations project an increase in aircraft supportability and reliability, an improved maintainability, decreasing acquisition and life cycle costs. Increased usable fuel volume and lower weight than conventional bladders improve performance. Concept feasibility was demonstrated on sub-scale aircraft fuel tanks. Materials were selected by testing sprayable elastomers in a fuel tank environment. Chemical stability, mechanical properties, and dynamic durability of the elastomer are being evaluated at the laboratory level and in sub-scale and full scale aircraft component fatigue tests. The self sealing capability of sprayable materials is also under development. Ballistic tests show an improved aircraft survivability, due in part to the elastomer's mechanical properties and its ability to damp vibrations. New application equipment, system removal, and repair methods are being investigated.
40 CFR 91.408 - Pre-test procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...
40 CFR 91.408 - Pre-test procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...
40 CFR 91.408 - Pre-test procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...
40 CFR 91.408 - Pre-test procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...
40 CFR 91.408 - Pre-test procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the...
49 CFR 178.348-5 - Pressure and leakage test.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test..., and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12, 1989. Redesignated by...
49 CFR 178.348-5 - Pressure and leakage test.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test..., and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12, 1989. Redesignated by...
49 CFR 178.348-5 - Pressure and leakage test.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test..., and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12, 1989. Redesignated by...
49 CFR 178.348-5 - Pressure and leakage test.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test..., and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12, 1989. Redesignated by...
Phase change paint tests on Rockwell orbiter/tank and orbiter alone configurations (OH3A/OH3B)
NASA Technical Reports Server (NTRS)
Quan, M.; Craig, C.
1974-01-01
Wind tunnel tests were conducted on scale models of the space shuttle orbiter and external tank. The tests were designed to determine the basic heating rate and interference effects on the orbiter-tank configuration and to analyze the effectiveness of the thermal protective system on the reentry vehicle. The phase change paint techniques were used to determine areodynamic heating rates. Oil flow and schlieren photographs were used for flow visualization.
NASA Technical Reports Server (NTRS)
Hardin, R.; Burrows, R. R.
1974-01-01
Wind tunnel tests were conducted to obtain aerodynamic force data for Mach numbers from 0.60 to 1.20. Data were obtained for an alpha range of -10 deg to +10 deg (beta = 0 deg beta = 5 deg) and beta range of -10 deg to +10 deg (alpha = 0 deg). Longitudinal and lateral-directional stability and control data were obtained for tank alone, tank plus SRB's, tank plus Orbiter, and mated configuration of tank + Orbiter + SRB's. Also, single-component rudder hinge moment data were obtained at rudder deflections of 0 and -20 deg for each Mach number tested. Plots of aerodynamic coefficients vs. Mach number are presented, using data from both test IA41 and tests LRC-UPWT-1056, 1073 (IA42A/B) for Mach numbers of 1.60 to 4.63. The model tested in IA42A/B was the same model as tested in IA41.
40 CFR 86.1430 - Certification Short Test sequence; general requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... test procedure. Fuel tank drain and fill is performed or a transient test procedure is performed, as... sets of test conditions identified in this subpart are based on the test fuel type present in the vehicle fuel tank and the ambient temperature during the test. Tables O-96-1 and O-96-2 outline the...
40 CFR 86.1430 - Certification Short Test sequence; general requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... test procedure. Fuel tank drain and fill is performed or a transient test procedure is performed, as... sets of test conditions identified in this subpart are based on the test fuel type present in the vehicle fuel tank and the ambient temperature during the test. Tables O-96-1 and O-96-2 outline the...