Sample records for early site permit

  1. 10 CFR 52.28 - Transfer of early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Transfer of early site permit. 52.28 Section 52.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.28 Transfer of early site permit. An application to transfer an early site...

  2. 10 CFR 52.28 - Transfer of early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transfer of early site permit. 52.28 Section 52.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.28 Transfer of early site permit. An application to transfer an early site...

  3. 10 CFR 52.39 - Finality of early site permit determinations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Finality of early site permit determinations. 52.39... NUCLEAR POWER PLANTS Early Site Permits § 52.39 Finality of early site permit determinations. (a) Commission finality. (1) Notwithstanding any provision in 10 CFR 50.109, while an early site permit is in...

  4. 10 CFR 52.39 - Finality of early site permit determinations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Finality of early site permit determinations. 52.39... NUCLEAR POWER PLANTS Early Site Permits § 52.39 Finality of early site permit determinations. (a) Commission finality. (1) Notwithstanding any provision in 10 CFR 50.109, while an early site permit is in...

  5. 10 CFR 52.24 - Issuance of early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Issuance of early site permit. 52.24 Section 52.24 Energy... Early Site Permits § 52.24 Issuance of early site permit. (a) After conducting a hearing under § 52.21 and receiving the report to be submitted by the ACRS under § 52.23, the Commission may issue an early...

  6. 10 CFR 52.24 - Issuance of early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Issuance of early site permit. 52.24 Section 52.24 Energy... Early Site Permits § 52.24 Issuance of early site permit. (a) After conducting a hearing under § 52.21 and receiving the report to be submitted by the ACRS under § 52.23, the Commission may issue an early...

  7. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  8. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  9. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  10. 10 CFR 52.27 - Limited work authorization after issuance of early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Limited work authorization after issuance of early site..., AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.27 Limited work authorization after issuance of early site permit. A holder of an early site permit may request a limited work authorization in...

  11. 10 CFR 52.27 - Limited work authorization after issuance of early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Limited work authorization after issuance of early site..., AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.27 Limited work authorization after issuance of early site permit. A holder of an early site permit may request a limited work authorization in...

  12. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  13. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  14. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  15. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  16. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  17. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  18. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  19. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  20. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  1. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  2. Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2008-03-26

    This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review ofmore » an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience

  3. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  4. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  5. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  6. 10 CFR 2.603 - Acceptance and docketing of application for early review of site suitability issues in a...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptance and docketing of application for early review... Procedures Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2...

  7. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  8. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  9. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    EPA Pesticide Factsheets

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  10. Wyoming's industrial siting permit process and environmental impact assessment

    NASA Astrophysics Data System (ADS)

    Hyman, Eric L.

    1982-01-01

    The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.

  11. Permitting and siting success using the `I-site` approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coco, T.J.

    Growth in the waste-to-energy industry has fallen considerably since its hey day in the mid-1980s. Depending on the perspectives of various interests, many explanations for this decline are given. These include the effects of recycling mandates, lack of energy markets and citizen environmental concerns. Two obstacles to successful siting - energy surpluses and overly ambitious recycling mandates - are being cleared away. Deregulation of the electric power industry promises to create new, competitive energy markets. Utilities are making plans to exit the so-called {open_quotes}merchant function,{close_quotes} thus creating new opportunities for independent power producers and aggregators. Unreliable recycling markets present newmore » demands for disposal capacity. There appears, then, to be only one remaining hurdle that must be overcome for the industry to take advantage of the potential opportunities ahead. Not surprisingly, it is community perception. Driven by a fear of the unknown, the public - including news reporters and local politicians - challenges disposal methods they do not understand. And their protests persist even though these projects actually lessen many environmental threats. Fueling opponents are some personal injury lawyers and special interest groups that secure economic opportunity from the debate. How can the waste-to-energy industry take advantage of new market opportunities, win permits with a minimum of delay, limit costly conditions, reduce unfounded objections and contain legal costs? The answer is letting down the traditional corporate guard and fully `involving` all constituent audiences in the siting process. The success of the involvement in siting - or the `I-Site` - approach also relies heavily on the adoption of a new, yet common sense, communications model. These conclusions are based on a comparison of siting successes and failures over the last 15 years, including lessons learned from other industries.« less

  12. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... live and dead loads, unless the structure, including any attached garage, carport, deck, and porch, is... structures. 3285.903 Section 3285.903 Housing and Urban Development Regulations Relating to Housing and Urban... Manufacturer's Installation Instructions § 3285.903 Permits, alterations, and on-site structures. It is...

  13. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... live and dead loads, unless the structure, including any attached garage, carport, deck, and porch, is... structures. 3285.903 Section 3285.903 Housing and Urban Development Regulations Relating to Housing and Urban... Manufacturer's Installation Instructions § 3285.903 Permits, alterations, and on-site structures. It is...

  14. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... live and dead loads, unless the structure, including any attached garage, carport, deck, and porch, is... structures. 3285.903 Section 3285.903 Housing and Urban Development Regulations Relating to Housing and Urban... Manufacturer's Installation Instructions § 3285.903 Permits, alterations, and on-site structures. It is...

  15. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... live and dead loads, unless the structure, including any attached garage, carport, deck, and porch, is... structures. 3285.903 Section 3285.903 Housing and Urban Development Regulations Relating to Housing and Urban... Manufacturer's Installation Instructions § 3285.903 Permits, alterations, and on-site structures. It is...

  16. 10 CFR 2.603 - Acceptance and docketing of application for early review of site suitability issues in a...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2... processing, the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor...

  17. NPDES Permit for Arboles Sand & Stone's Lob Lolly Industrial Site in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0048194, Arboles Sand & Stone, LLC is authorized to discharge from its wastewater treatment facility at the Lob Lolly Industrial Site in Archuleta County, Colorado, to the Piedra River.

  18. Permit Fees

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  19. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  20. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  1. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  2. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  3. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  4. Synthetic Minor NSR Permit: BP America Production Company - Treating Site #8 Central Delivery Point

    EPA Pesticide Factsheets

    This page contains the response to public comments and the final synthetic minor NSR permit for the BP America Production Company, Treating Site #8 Central Delivery Point, located on the Southern Ute Indian Reservation in La Plata County, CO.

  5. Early Market Site Identification Data

    DOE Data Explorer

    Levi Kilcher

    2016-04-01

    This data was compiled for the 'Early Market Opportunity Hot Spot Identification' project. The data and scripts included were used in the 'MHK Energy Site Identification and Ranking Methodology' Reports (Part I: Wave, NREL Report #66038; Part II: Tidal, NREL Report #66079). The Python scripts will generate a set of results--based on the Excel data files--some of which were described in the reports. The scripts depend on the 'score_site' package, and the score site package depends on a number of standard Python libraries (see the score_site install instructions).

  6. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Wastemore » Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the

  7. Soil Sample Report in Support of the Site 300 EWTF Ecological Risk Assessment and Permit Renewal-September 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terusaki, Stanley; Gallegos, Gretchen; MacQueen, Donald

    2012-10-02

    LLNL Site 300 has applied to renew the permits for its Explosives Waste Treatment Facility (EWTF), Explosives Waste Storage Facility (EWSF) and Building 883 Storage Facility. As a part of the permit renewal process, the Department of Toxic Substances Control (DTSC) requested LLNL to obtain soil samples in order to conduct a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. As stated in the guidance document, the scoping-level ecological risk assessment provides a framework to determine the potentialmore » interaction ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF.« less

  8. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  9. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  10. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  11. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  12. EPA Issued Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  13. Title V Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  14. Historical Permit Fee Rates

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements. Historical fee rates.

  15. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  16. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  17. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  18. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  19. Early mechanical stimulation only permits timely bone healing in sheep.

    PubMed

    Tufekci, Pelin; Tavakoli, Aramesh; Dlaska, Constantin; Neumann, Mirjam; Shanker, Mihir; Saifzadeh, Siamak; Steck, Roland; Schuetz, Michael; Epari, Devakar

    2018-06-01

    Bone fracture healing is sensitive to the fixation stability. However, it is unclear which phases of healing are mechano-sensitive and if mechanical stimulation is required throughout repair. In this study, a novel bone defect model, which isolates an experimental fracture from functional loading, was applied in sheep to investigate if stimulation limited to the early proliferative phase is sufficient for bone healing. An active fixator controlled motion in the fracture. Animals of the control group were unstimulated. In the physiological-like group, 1 mm axial compressive movements were applied between day 5 and 21, thereafter the movements were decreased in weekly increments and stopped after 6 weeks. In the early stimulatory group, the movements were stopped after 3 weeks. The experimental fractures were evaluated with mechanical and micro-computed tomography methods after 9 weeks healing. The callus strength of the stimulated fractures (physiological-like and early stimulatory) was greater than the unstimulated control group. The control group was characterized by minimal external callus formation and a lack of bone bridging at 9 weeks. In contrast, the stimulated groups exhibited advanced healing with solid bone formation across the defect. This was confirmed quantitatively by a lower bone volume in the control group compared to the stimulated groups.The novel experimental model permits the application of a well-defined load history to an experimental bone fracture. The poor healing observed in the control group is consistent with under-stimulation. This study has shown early mechanical stimulation only is sufficient for a timely healing outcome. © 2017 Orthopaedic Research Society. Published by Wiley Periodicals, Inc. J Orthop Res 36:1790-1796, 2018. © 2017 Orthopaedic Research Society. Published by Wiley Periodicals, Inc.

  20. City and County Solar PV Training Program, Module 3: Detailed Site Evaluation, Project Validation, and Permitting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Day, Megan H; Lisell, Lars J

    This is the third of five training modules recorded for the City and County Solar PV Training Program. The program is focused on training local government staff in the PV procurement process. This module focuses on siting and permitting for both rooftop and larger, ground-mounted systems rand includes a link to a video.

  1. Special and Research Permits for Ocean Dumping

    EPA Pesticide Factsheets

    Special permits and research permits under the Marine Protection, Research and Sanctuaries Act may be issued by EPA for ocean dumping. Examples and ocean disposal sites for special and research permits are provided.

  2. General Permits for Ocean Dumping

    EPA Pesticide Factsheets

    General permits are issued by EPA for the ocean dumping of certain materials that will have a minimal adverse environmental impact and are generally disposed of in small quantities. Information includes examples and ocean disposal sites for general permits

  3. Characteristics of visitors without permits compared to those with permits at the Desolation Wilderness, California

    Treesearch

    Alan E. Watson

    1993-01-01

    At the Desolation Wilderness a sample of visitors without the required use permit were asked to complete a short survey to allow them to be compared with visitors who had gotten permits. Previous research suggested that those without permits would be less experienced at the site, and be more likely to be anglers, on shorter visits, younger, in smaller groups, or with...

  4. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  5. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  6. Emergencies and Emergency Permits for Ocean Dumping

    EPA Pesticide Factsheets

    Emergency permits under the MPRSA are issued if disposed material poses a threat to human health. Information is provided on emergency permit examples and disposal sites. Emergencies to safeguard life at sea does not require an ocean dumping permit.

  7. Early LROC Views of Lunar 'Heritage' Sites

    NASA Astrophysics Data System (ADS)

    Stooke, P. J.

    2010-03-01

    Early LROC images show some old hardware locations including Apollo and Surveyor sites. The images are used to improve EVA traverse maps and to identify the discarded Surveyor 3 retro-rocket. Future opportunities to observe other items are discussed.

  8. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    2010-06-17

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage atmore » the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.« less

  9. Model Validation and Site Characterization for Early Deployment MHK Sites and Establishment of Wave Classification Scheme

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kilcher, Levi F

    Model Validation and Site Characterization for Early Deployment Marine and Hydrokinetic Energy Sites and Establishment of Wave Classification Scheme presentation from from Water Power Technologies Office Peer Review, FY14-FY16.

  10. 50 CFR 622.70 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... such fish or other marine organisms are possessed, through landing ashore. (2) Aquacultured live rock. For a person to take or possess aquacultured live rock in the Gulf EEZ, a Federal aquacultured live rock permit must have been issued for the specific harvest site. Such permit, or a copy, must be on...

  11. 50 CFR 622.70 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... such fish or other marine organisms are possessed, through landing ashore. (2) Aquacultured live rock. For a person to take or possess aquacultured live rock in the Gulf EEZ, a Federal aquacultured live rock permit must have been issued for the specific harvest site. Such permit, or a copy, must be on...

  12. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions. Volume 2, Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake`s ground motion is a function of the earthquake`s magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is amore » stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. This document, Volume II, contains Appendices 2, 3, 5, 6, and 7 covering the following topics: Eastern North American Empirical Ground Motion Data; Examination of Variance of Seismographic Network Data; Soil Amplification and Vertical-to-Horizontal Ratios from Analysis of Strong Motion Data From Active Tectonic Regions; Revision and Calibration of Ou and Herrmann Method; Generalized Ray Procedure for Modeling Ground Motion Attenuation; Crustal Models for Velocity Regionalization; Depth Distribution Models; Development of Generic Site Effects Model; Validation and Comparison of One-Dimensional Site Response Methodologies; Plots of Amplification Factors; Assessment of Coupling Between Vertical & Horizontal Motions in Nonlinear Site Response Analysis; and Modeling of Dynamic Soil Properties.« less

  13. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Pre-Application Early Review of Site Suitability Issues Q... FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This... Reactor Safeguards of requests for early review of one or more site suitability issues relating to the...

  14. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Pre-Application Early Review of Site Suitability Issues Q... FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This... Reactor Safeguards of requests for early review of one or more site suitability issues relating to the...

  15. Some early astronomical sites in the Kashmir region

    NASA Astrophysics Data System (ADS)

    Iqbal, Naseer; Vahia, M. N.; Masood, Tabasum; Ahmad, Aijaz

    2009-03-01

    We discuss a number of early rock art sites in the Kashmir Valley in northern India and neighbouring Pakistan, and suggest that some of these contain depictions of astronomical objects or events. The sites are in the Srinagar and Sopore regions and in or near the Ladakh region, and date to Neolithic or Upper Paleolithic times. Our studies suggest that during this period some of the ancient astronomers recorded supernovae, meteorite impacts, the Sun, the Moon and the seasons in their rock art.

  16. Cortico-cortical evoked potentials for sites of early versus late seizure spread in stereoelectroencephalography.

    PubMed

    Lega, Bradley; Dionisio, Sasha; Flanigan, Patrick; Bingaman, William; Najm, Imad; Nair, Dileep; Gonzalez-Martinez, Jorge

    2015-09-01

    Cortico-cortical evoked potentials offer the possibility of understanding connectivity within seizure networks to improve diagnosis and more accurately identify candidates for seizure surgery. We sought to determine if cortico-cortical evoked potentials and post-stimulation oscillatory changes differ for sites of EARLY versus LATE ictal spread. 37 patients undergoing stereoelectroencephalography were tested using a cortico-cortical evoked potential paradigm. All electrodes were classified according to the speed of ictal spread. EARLY spread sites were matched to a LATE spread site equidistant from the onset zone. Root-mean-square was used to quantify evoked responses and post-stimulation gamma band power and coherence were extracted and compared. Sites of EARLY spread exhibited significantly greater evoked responses after stimulation across all patients (t(36)=2.973, p=0.004). Stimulation elicited enhanced gamma band activity at EARLY spread sites (t(36)=2.61, p=0.03, FDR corrected); this gamma band oscillation was highly coherent with the onset zone. Cortico-cortical evoked potentials and post-stimulation changes in gamma band activity differ between sites of EARLY versus LATE ictal spread. The oscillatory changes can help visualize connectivity within the seizure network. Copyright © 2015 Elsevier B.V. All rights reserved.

  17. New Early Cycladic Figurine At Nea Styra

    NASA Astrophysics Data System (ADS)

    Kosma, M.

    The existence of an Early Bronze Age coastal site in the district of Nea Styra has been known since the end of the 19th century when three marble figurines of early Cycladic type had been found in the area. During the 20th century survey investigations conducted by Greek and foreign archaeologists offered new evidence which demonstrated the significance of the site during the Early and Middle Helladic periods. A new figurine of early Cycladic type, which recently came to light at Nea Styra due to the control of building permits by the 11th Ephorate of Prehistoric and Classical Antiquities, reaffirms the identification of the area as one of the three most important sites on Euboea during the Early Helladic II period. This paper focuses on a newly discovered figurine and its typological character. The new find is compared to the figurines that had been found in the 19th century at Nea Styra. We hope that the scheduled excavations on the private land plot where the new figurine was found will offer new data leading to a better understanding of the character of the Early Helladic settlement in this part of southern Euboea.

  18. 43 CFR 3.3 - Permits; to whom granted.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Permits; to whom granted. 3.3 Section 3.3 Public Lands: Interior Office of the Secretary of the Interior PRESERVATION OF AMERICAN ANTIQUITIES § 3.3 Permits; to whom granted. Permits for the examination of ruins, the excavation of archeological sites, and...

  19. 43 CFR 3.3 - Permits; to whom granted.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Permits; to whom granted. 3.3 Section 3.3 Public Lands: Interior Office of the Secretary of the Interior PRESERVATION OF AMERICAN ANTIQUITIES § 3.3 Permits; to whom granted. Permits for the examination of ruins, the excavation of archeological sites, and...

  20. 43 CFR 3.3 - Permits; to whom granted.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Permits; to whom granted. 3.3 Section 3.3 Public Lands: Interior Office of the Secretary of the Interior PRESERVATION OF AMERICAN ANTIQUITIES § 3.3 Permits; to whom granted. Permits for the examination of ruins, the excavation of archeological sites, and...

  1. 43 CFR 3.3 - Permits; to whom granted.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Permits; to whom granted. 3.3 Section 3.3 Public Lands: Interior Office of the Secretary of the Interior PRESERVATION OF AMERICAN ANTIQUITIES § 3.3 Permits; to whom granted. Permits for the examination of ruins, the excavation of archeological sites, and...

  2. 18 CFR 50.11 - General conditions applicable to permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... applicable to permits. 50.11 Section 50.11 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS FOR PERMITS TO SITE INTERSTATE ELECTRIC TRANSMISSION FACILITIES § 50.11 General conditions applicable to permits...

  3. The National Solar Permitting Database

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gunderson, Renic

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identifymore » best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."« less

  4. Between Site Reliability of Startle Prepulse Inhibition Across Two Early Psychosis Consortia

    PubMed Central

    Addington, Jean; Cannon, Tyrone D.; Cornblatt, Barbara A.; de la Fuente-Sandoval, Camilo; Mathalon, Dan H.; Perkins, Diana O.; Seidman, Larry J.; Tsuang, Ming; Walker, Elaine F.; Woods, Scott W.; Bachman, Peter; Belger, Ayse; Carrión, Ricardo E.; Donkers, Franc C.L.; Duncan, Erica; Johannesen, Jason; León-Ortiz, Pablo; Light, Gregory; Mondragón, Alejandra; Niznikiewicz, Margaret; Nunag, Jason; Roach, Brian J.; Solís-Vivanco, Rodolfo

    2014-01-01

    Prepulse inhibition (PPI) and reactivity of the acoustic startle response are widely used biobehavioral markers in psychopathology research. Previous studies have demonstrated that PPI and startle reactivity exhibit substantial within-site stability; between-site stability, however, has not been established. In two separate consortia investigating biomarkers of early psychosis, traveling subjects studies were performed as part of quality assurance procedures in order to assess the fidelity of data across sites. In the North American Prodromal Longitudinal Studies (NAPLS) Consortium, 8 normal subjects traveled to each of the 8 NAPLS sites and were tested twice at each site on the startle PPI paradigm. In preparation for a binational study, 10 healthy subjects were assessed twice in both San Diego and Mexico City. Intraclass correlations between and within sites were significant for PPI and startle response parameters, confirming the reliability of startle measures across sites in both consortia. There were between site differences in startle magnitude in the NAPLS study that did not appear to be related to methods or equipment. In planning multi-site studies, it is essential to institute quality assurance procedures early and establish between site reliability to assure comparable data across sites. PMID:23799460

  5. BP America Treating Site #9 Compressor Station... Status of PSD and Title V permits following decommissioning of site

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. 40 CFR 220.3 - Categories of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Marine Pollution by Dumping of Wastes and Other Matter that are likely to be affected by the dumping...) Permits for incineration at sea. Permits for incineration of wastes at sea will be issued only as research... where studies on the waste, the incineration method and vessel, and the site have been conducted and the...

  7. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  8. Early recognition of growth abnormalities permitting early intervention

    USDA-ARS?s Scientific Manuscript database

    Normal growth is a sign of good health. Monitoring for growth disturbances is fundamental to children's health care. Early detection and diagnosis of the causes of short stature allows management of underlying medical conditions, optimizing attainment of good health and normal adult height. This rev...

  9. The Role of Social Networking Sites in Early Adolescents' Social Lives

    ERIC Educational Resources Information Center

    Antheunis, Marjolijn L.; Schouten, Alexander P.; Krahmer, Emiel

    2016-01-01

    The aim of this study was to examine the role of social networking sites (SNSs) in early adolescents' social lives. First, we investigated the relation between SNS use and several aspects of early adolescents' social lives (i.e., friendship quality, bridging social capital, and bonding social capital). Second, we examined whether there are…

  10. Permit application modifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  11. Web site review. Carolinas HealthCare recognized Internet marketing potential early.

    PubMed

    Botvin, Judith D

    2005-01-01

    Since the early days of the Internet, administrators Carolinas HealthCare System in Charlotte, NC, have appreciated its potential as a marketing tool. This places a lot of expectations on the Web site, www.carolinashealthcare.org, which is managed by the marketing-public relations department. Find out how the well-established site fulfills its mission and more.

  12. Oil and Gas Stormwater Permitting Documents

    EPA Pesticide Factsheets

    This final rule exempts construction activities at oil and gas sites from the requirement to obtain an NPDES permit for stormwater discharges except in very limited instances. This rule is effective June 12, 2006.

  13. 25 CFR 247.16 - What fire is permitted?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What fire is permitted? 247.16 Section 247.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE USE OF COLUMBIA RIVER TREATY FISHING ACCESS SITES § 247.16 What fire is permitted? (a) You may have a fire in designated fire places...

  14. 25 CFR 247.16 - What fire is permitted?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false What fire is permitted? 247.16 Section 247.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE USE OF COLUMBIA RIVER TREATY FISHING ACCESS SITES § 247.16 What fire is permitted? (a) You may have a fire in designated fire places...

  15. 78 FR 8193 - In the Matter of Virginia Electric and Power Company, and Old Dominion Electric Cooperative; ESP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0476; Docket No. 52-008 Early Site Permit No. ESP-003] In... North Anna ESP Site; Order Approving Direct Transfer of Early Site Permit and Approving Conforming... Dominion Electric Cooperative (ODEC), hold Early Site Permit 003 (ESP-003) for North Anna Site issued on...

  16. PKM2 released by neutrophils at wound site facilitates early wound healing by promoting angiogenesis.

    PubMed

    Zhang, Yinwei; Li, Liangwei; Liu, Yuan; Liu, Zhi-Ren

    2016-03-01

    Neutrophils infiltration/activation following wound induction marks the early inflammatory response in wound repair. However, the role of the infiltrated/activated neutrophils in tissue regeneration/proliferation during wound repair is not well understood. Here, we report that infiltrated/activated neutrophils at wound site release pyruvate kinase M2 (PKM2) by its secretive mechanisms during early stages of wound repair. The released extracellular PKM2 facilitates early wound healing by promoting angiogenesis at wound site. Our studies reveal a new and important molecular linker between the early inflammatory response and proliferation phase in tissue repair process. © 2016 by the Wound Healing Society.

  17. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Pre-Application Early Review of Site Suitability Issues Q Appendix Q to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This...

  18. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Pre-Application Early Review of Site Suitability Issues Q Appendix Q to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This...

  19. 10 CFR Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Pre-Application Early Review of Site Suitability Issues Q Appendix Q to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. Q Appendix Q to Part 50—Pre-Application Early Review of Site Suitability Issues This...

  20. Early atmospheric detection of carbon dioxide from carbon capture and storage sites

    PubMed Central

    Pak, Nasrin Mostafavi; Rempillo, Ofelia; Norman, Ann-Lise; Layzell, David B.

    2016-01-01

    ABSTRACT The early atmospheric detection of carbon dioxide (CO2) leaks from carbon capture and storage (CCS) sites is important both to inform remediation efforts and to build and maintain public support for CCS in mitigating greenhouse gas emissions. A gas analysis system was developed to assess the origin of plumes of air enriched in CO2, as to whether CO2 is from a CCS site or from the oxidation of carbon compounds. The system measured CO2 and O2 concentrations for different plume samples relative to background air and calculated the gas differential concentration ratio (GDCR = −ΔO2/ΔCO2). The experimental results were in good agreement with theoretical calculations that placed GDCR values for a CO2 leak at 0.21, compared with GDCR values of 1–1.8 for the combustion of carbon compounds. Although some combustion plume samples deviated in GDCR from theoretical, the very low GDCR values associated with plumes from CO2 leaks provided confidence that this technology holds promise in providing a tool for the early detection of CO2 leaks from CCS sites.  Implications: This work contributes to the development of a cost-effective technology for the early detection of leaks from sites where CO2 has been injected into the subsurface to enhance oil recovery or to permanently store the gas as a strategy for mitigating climate change. Such technology will be important in building public confidence regarding the safety and security of carbon capture and storage sites. PMID:27111469

  1. Early atmospheric detection of carbon dioxide from carbon capture and storage sites.

    PubMed

    Pak, Nasrin Mostafavi; Rempillo, Ofelia; Norman, Ann-Lise; Layzell, David B

    2016-08-01

    The early atmospheric detection of carbon dioxide (CO2) leaks from carbon capture and storage (CCS) sites is important both to inform remediation efforts and to build and maintain public support for CCS in mitigating greenhouse gas emissions. A gas analysis system was developed to assess the origin of plumes of air enriched in CO2, as to whether CO2 is from a CCS site or from the oxidation of carbon compounds. The system measured CO2 and O2 concentrations for different plume samples relative to background air and calculated the gas differential concentration ratio (GDCR = -ΔO2/ΔCO2). The experimental results were in good agreement with theoretical calculations that placed GDCR values for a CO2 leak at 0.21, compared with GDCR values of 1-1.8 for the combustion of carbon compounds. Although some combustion plume samples deviated in GDCR from theoretical, the very low GDCR values associated with plumes from CO2 leaks provided confidence that this technology holds promise in providing a tool for the early detection of CO2 leaks from CCS sites. This work contributes to the development of a cost-effective technology for the early detection of leaks from sites where CO2 has been injected into the subsurface to enhance oil recovery or to permanently store the gas as a strategy for mitigating climate change. Such technology will be important in building public confidence regarding the safety and security of carbon capture and storage sites.

  2. 10 CFR 2.623 - Notice of hearing on application for early review of site suitability issues in combined license...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part...

  3. 10 CFR 2.623 - Notice of hearing on application for early review of site suitability issues in combined license...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part...

  4. 10 CFR 2.623 - Notice of hearing on application for early review of site suitability issues in combined license...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part...

  5. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... permit does not convey any property rights of any sort, or any exclusive privilege; and (v) The permittee... enforce the emission trades; and (v) The early reductions source owner or operator provides the... submitted to the Administrator or the Administrator's designated agent; and (v) Such additional requirements...

  6. State Waste Discharge Permit Application: Electric resistance tomography testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the arealmore » extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.« less

  7. 50 CFR 622.220 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Coral, Coral Reefs, and... take or possess fish or other marine organisms with an allowable chemical in a coral area, other than... or possessing live rock from an aquacultured live rock site. (4) Prohibited coral. A Federal permit...

  8. 50 CFR 622.220 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Coral, Coral Reefs, and... take or possess fish or other marine organisms with an allowable chemical in a coral area, other than... or possessing live rock from an aquacultured live rock site. (4) Prohibited coral. A Federal permit...

  9. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF)more » and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS.« less

  10. Integra™ permits early durable coverage of improvised explosive device (IED) amputation stumps.

    PubMed

    Foong, Deborah P S; Evriviades, Demetrius; Jeffery, Steven L A

    2013-12-01

    Improvised explosive device (IED) blasts cause serious injury. Survivors are left with multiple amputations, considerable soft tissue loss and open fractures with gross contamination. We present our early experience of Integra™ in the acute management of military wounds. The clinical records of all patients with IED injuries who underwent early reconstruction with Integra™ during the six month period between August and December 2009 in our unit were reviewed and data gathered prospectively. There were 7 male soldiers, aged 21-31 years (mean=26). All sustained trunk and limb injuries, including multiple amputations. Number of procedures prior to application of Integra™ was 4-10 (mean=5). Application of Integra™ took place 6-24 days post-injury (mean=13). Size of wounds covered with Integra™ was 1-11.5% TBSA (mean=5%). Anatomical sites reconstructed included amputation stumps, and both upper and lower limbs. There was partial take of Integra in 3 wounds in 2 patients. All wounds were eventually treated with delayed split skin grafting and healed satisfactorily. IEDs produce a large zone of injury with massive soft tissue damage, multiple discontinuous wounds which are significantly contaminated. The physiological insult is equivalent to a large cutaneous burn and there is a paucity of available donor sites. Multiple amputees also have a greater energy and power requirement(1-4) and cannot spare remaining functional muscles as donors. The literature suggests that microvascular flaps have a high failure rate in military patients.(5) Reconstruction began as soon as wounds were considered sufficiently clean. Integra™ was applied with the aim of providing higher quality coverage than that provided by split skin grafting alone (particularly for amputation stumps) whilst minimising operative time and morbidity. Integra™ allows timely closure of battlefield wounds with minimal operative time and morbidity. The procedure can begin whilst still in the acute phase

  11. Artificially regenerating longleaf pine on wet sites: preliminary analysis of effects of site preparation treatments on early survival and growth

    Treesearch

    Benjamin O. Knapp; G. Geoff Wang; Joan L. Walker

    2010-01-01

    Our study, conducted over two years on poorly drained, sandy sites in Onslow County, NC, compared the effects of eight common site preparation treatments on early survival and growth of planted longleaf pine seedlings. Through two growing seasons, we found survival to be similar across all treatments (p = 0.8806), but root collar diameter was greatest with combinations...

  12. 10 CFR 2.621 - Acceptance and docketing of application for early review of site suitability issues in a combined...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptance and docketing of application for early review... Procedures Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under...

  13. 226. Early construction on section 2A1. This was the site ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    226. Early construction on section 2-A-1. This was the site of the first construction on the Blue Ride Parkway. - Blue Ridge Parkway, Between Shenandoah National Park & Great Smoky Mountains, Asheville, Buncombe County, NC

  14. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    2010-10-04

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) ismore » the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term

  15. 10 CFR 2.623 - Notice of hearing on application for early review of site suitability issues in combined license...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part 52 § 2.623 Notice of...

  16. 10 CFR 2.623 - Notice of hearing on application for early review of site suitability issues in combined license...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part 52 § 2.623 Notice of...

  17. Wesco Operating Inc., Lander Field NPDES Proposed Permit

    EPA Pesticide Factsheets

    Indian Country, Minor, indust., non-discharge, proposed permit WY-0000221 establishes monitoring and reporting provisions should an unauthorized release of produced water occur from the Wesco Operating, Inc., Lander Field NW Discharge oil production site.

  18. 32 CFR 767.7 - Conditions of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE JURISDICATION OF THE... to submit to NHC a working and diving log listing days spent in field research, activities pursued... protect all sensitive information regarding the location and character of the wreck site that could...

  19. Oldest known dinosaurian nesting site and reproductive biology of the Early Jurassic sauropodomorph Massospondylus

    PubMed Central

    Reisz, Robert R.; Evans, David C.; Roberts, Eric M.; Sues, Hans-Dieter; Yates, Adam M.

    2012-01-01

    The extensive Early Jurassic continental strata of southern Africa have yielded an exceptional record of dinosaurs that includes scores of partial to complete skeletons of the sauropodomorph Massospondylus, ranging from embryos to large adults. In 1976 an incomplete egg clutch including in ovo embryos of this dinosaur, the oldest known example in the fossil record, was collected from a road-cut talus, but its exact provenance was uncertain. An excavation program at the site started in 2006 has yielded multiple in situ egg clutches, documenting the oldest known dinosaurian nesting site, predating other similar sites by more than 100 million years. The presence of numerous clutches of eggs, some of which contain embryonic remains, in at least four distinct horizons within a small area, provides the earliest known evidence of complex reproductive behavior including site fidelity and colonial nesting in a terrestrial vertebrate. Thus, fossil and sedimentological evidence from this nesting site provides empirical data on reproductive strategies in early dinosaurs. A temporally calibrated optimization of dinosaurian reproductive biology not only demonstrates the primary significance of the Massospondylus nesting site, but also provides additional insights into the initial stages of the evolutionary history of dinosaurs, including evidence that deposition of eggs in a tightly organized single layer in a nest evolved independently from brooding. PMID:22308330

  20. 76 FR 59423 - Drakes Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes National... Drakes Bay Oyster Company Special-use permit in Drakes Estero, Point Reyes National Seashore, California... site, at http://parkplanning.nps.gov/pore (click on the Drakes Bay Oyster Company Special-use permit...

  1. 40 CFR 264.555 - Disposal of CAMU-eligible wastes in permitted hazardous waste landfills.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permitted hazardous waste landfills. 264.555 Section 264.555 Protection of Environment ENVIRONMENTAL...-eligible wastes in permitted hazardous waste landfills. (a) The Regional Administrator with regulatory... hazardous waste landfills not located at the site from which the waste originated, without the wastes...

  2. NPDES Permit for Wesco Operating, Inc., Lander Field in Wyoming

    EPA Pesticide Factsheets

    Indian Country, Minor, indust., non-discharge, permit WY-0000221 Wesco Operating, Inc., is directed to have no discharge from the Lander Field NW Discharge oil production site in Fremont County, Wyoming.

  3. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  4. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  5. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  6. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  7. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  8. WIPP Hazardous Waste Facility Permit Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kehrman, B.; Most, W.

    2006-07-01

    The Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (HWFP) was issued on October 27, 1999 [1]. Since that time, the WIPP has sought modifications to clarify the permit language, provide alternative methods for meeting permit requirements and to update permit conditions. Significant advancements have been made in transuranic (TRU) waste management as the result of modifications to the HWFP. Among these advancements is a modification to obtain a drum age criteria (DAC) value to perform headspace gas sampling on drums to be super-compacted and placed in a 100-gallon overpack drum. In addition, the Section 311 permit modification requestmore » that would allow for more efficient waste characterization, and the modification to authorize the shipment and disposal of Remote-Handled (RH) TRU waste were merged together and submitted to the regulator as the Consolidated Permit Modification Request (PMR). The submittal of the Consolidated PMR came at the request of the regulator as part of responses to Notices of Deficiency (NODs) for the separate PMRs which had been submitted in previous years. Section 311 of the fiscal year 2004 Energy and Water Developments Appropriations Act (Public Law 108-137) [2] directs the Department of Energy to submit a permit modification that limits waste confirmation to radiography or visual examination of a statistical subpopulation of containers. Section 311 also specifically directs that disposal room performance standards be to be met by monitoring for volatile organic compounds in the underground disposal rooms. This statute translates into the elimination of other waste confirmation methods such as headspace gas sampling and analysis and solids sampling and analysis. These methods, as appropriate, will continue to be used by the generator sites during hazardous waste determinations or characterization activities. This modification is expected to reduce the overall cost of waste analysis by hundreds of millions of

  9. Hazardous Waste Permitting

    EPA Pesticide Factsheets

    To provide RCRA hazardous waste permitting regulatory information and resources permitted facilities, hazardous waste generators, and permit writers. To provide the public with information on how they can be involved in the permitting process.

  10. Supplemental Environmental Baseline Survey for Proposed Land Use Permit Modification for Expansion of the Dynamic Explosive Test Site (DETS) 9940 Main Complex Parking Lot

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peek, Dennis W.

    The “subject property” is comprised of a parcel of land within the Kirtland Military Reservation, Bernalillo County, New Mexico, as shown on the map in Appendix B of this document. The land requirement for the parking lot addition to the 9940 Main Complex is approximately 2.7 acres. The scope of this Supplemental Environmental Baseline Survey (SEBS) is for the parking lot addition land transfer only. For details on the original 9940 Main Complex see Environmental Baseline Survey, Land Use Permit Request for the 9940 Complex PERM/0-KI-00-0001, August 21, 2003, and for details on the 9940 Complex Expansion see Environmental Baselinemore » Survey, Proposed Land Use Permit Expansion for 9940 DETS Complex, June 24, 2009. The 2.7-acre parcel of land for the new parking lot, which is the subject of this EBS (also referred to as the “subject property”), is adjacent to the southwest boundary of the original 12.3- acre 9940 Main Complex. No testing is known to have taken place on the subject property site. The only activity known to have taken place was the burial of overhead utility lines in 2014. Adjacent to the subject property, the 9940 Main Complex was originally a 12.3-acre site used by the Department of Energy (DOE) under a land use permit from the United States Air Force (USAF). Historical use of the site, dating from 1964, included arming, fusing, and firing of explosives and testing of explosives systems components. In the late 1970s and early 1980s experiments at the 9940 Main Complex shifted toward reactor safety issues. From 1983 to 1988, fuel coolant interaction (FCI) experiments were conducted, as were experiments with conventional high explosives (HE). Today, the land is used for training of the Nuclear Emergency Response community and for research on energetic materials. In 2009, the original complex was expanded to include four additional 20-acre areas: 9940 Training South, 9940 Training East, T-Range 6, and Training West Landing Zone. The

  11. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  12. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  13. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  14. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  15. Subsistence economy of el paraiso, an early peruvian site.

    PubMed

    Quilter, J; E, B O; Pearsall, D M; Sandweiss, D H; Jones, J G; Wing, E S

    1991-01-18

    Studies of food remains from the Preceramic monumental site of E1 Paraíso, Peru (1800 to 1500 B.C.), have shed new light on a debate regarding the relative importance of seafood versus terrestrial resources and the role of cultigens in subsistence economies during the early development of Peruvian civilization. Fish was the primary animal food at the site whereas plant foods consisted of a mixture of cultivated resources (squashes, beans, peppers, and jicama) with an additional reliance on fruits (guava, lucuma, and pacae). Wild plants, especially the roots of sedges and cat-tail, also may have accounted for a substantial part of the diet. Cotton was a chief crop, used in making fishing tackle and the textiles that served as clothing and items of high value and status. As an example of the beginnings of civilization, El Paraíso is a case in which impressive architecture was built on a relatively simple subsistence economy and energy was expended in the production of resources useful in local and regional exchange systems.

  16. Risk of Porphyromonas gingivalis recolonization during the early period of periodontal maintenance in initially severe periodontitis sites.

    PubMed

    Fujise, Osamu; Miura, Mayumi; Hamachi, Takafumi; Maeda, Katsumasa

    2006-08-01

    Porphyromonas gingivalis is considered a critical pathogen of periodontal diseases including recurrent periodontitis. The profound effects of active periodontal treatment (APT) on P. gingivalis elimination were previously demonstrated and revealed that the subsequent P. gingivalis-free or -suppressed status seems to be maintained during early periodontal maintenance (PMT). The aim of the present study was to show the occurrence of microbial recolonization during this early PMT period. In total, 128 sites from 11 generalized chronic periodontitis patients and one generalized aggressive periodontitis patient underwent clinical and microbiologic examination at baseline (Exam-I), after APT (Exam-II), and in PMT (Exam-III). Exam-III was carried out an average of 4.5 +/- 3.5 months after Exam-II. Detection and quantification of putative pathogens were performed using a polymerase chain reaction-based method. The PMT used was effective in maintaining the clinical conditions improved by APT. However, in microbiological examinations, Exam-III showed higher detection frequency and levels of P. gingivalis than Exam-II. This suggests that a P. gingivalis recolonization started in the early PMT period. P. gingivalis-increased sites then showed significantly more severe signs of periodontitis in Exam-I than P. gingivalis-stable sites (bleeding on probing frequency: 76.7% versus 56.5%; suppuration frequency: 41.9% versus 12.9%). On the other hand, in Exam-II, no significant differences of clinical parameters were noted between P. gingivalis-increased and -stable sites. Severe periodontitis sites before APT seemed to place them at risk of P. gingivalis recolonization in the early PMT period, and this microbial restoration could be a cause of recurrent periodontitis.

  17. Guidance on Initial Site Assessment at Corrective Action Sites

    EPA Pesticide Factsheets

    Guidance to be used to conduct Corrective Action site assessment efforts. Informs Resource Conservation and Recovery Act (RCRA) permit writers and enforcement officials of procedures to be used in conducting RCRA Facility Assessments.

  18. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment.

  19. Petition to Object to Department of Energy's Hanford Site, Richland, Washington, Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. Example evaluation of a permit application for a proposed hazardous-waste landfill in eastern Adams County, Colorado

    USGS Publications Warehouse

    Banta, E.R.

    1986-01-01

    A project was undertaken by the U.S. Geological Survey in cooperation with the U. S. Environmental Protection Agency to demonstrate methods by which RCRA (Resources Conservation and Recovery Act of 1976) Part B permit applications might be evaluated. The purpose of the project was to prepare a report that would supplement a series of case studies to be made available to permit writers in the U.S. Environmental Protection Agency. Four sites in the United States were chosen for their potential applicability to geologically similar sites. The Adams County, Colorado, site was chosen to be representative of sites in the Upper Cretaceous Pierre Shale. The intent of this report is to provide an example of how available earth-science information might be used in evaluating an application and not to evaluate the acceptability of the site. Because this study is an evaluation of a permit application, the data used are limited to the data supplied in the application and in published reports. Of the five criteria required by the U.S. Environmental Protection Agency to be addressed in the permit application considered in the case study, the application was evaluated to be inadequate in addressing three criteria: (1) Site characterization, (2) ability to monitor the location, and (3) flow paths and 100-foot time of travel. Details of the inadequacies and a description of the information needed to eliminate the inadequacies are included in the report. (USGS)

  1. Use of DAC-Hours for Radiation Work Permit Suspension Guides and Validation of Respiratory Equipment Selection at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadlock, D.J.

    Historically, the Savannah River Site, like many Department of Energy sites, has used some multiple of the expected Derived Air Concentration (DAC) of a radionuclide as a suspension guide for Radiological Work Permits (RWP) or validation of selected respiratory protection equipment. The term DAC expresses the concentration of a radionuclide in air, typically in mCi/cc. Even though the term DAC is derived from an intake of radioactivity (Annual Limit on Intake) that would result in defined estimated dose to a worker, knowing only the DAC value does not allow a worker's potential dose to be determined. Recently, the Savannah Rivemore » Site has converted to the use of DAC-hours for RWP suspension guides and respiratory equipment validation. The term DAC-hr takes into account not only the concentration of the radionuclide in air (DAC) but also the time the individual was exposed allowing an estimate of a worker's dose to be determined. The conversion to DAC-hrs resulted in four benefits to the radiation protection program without increasing the risk to workers; (1) consistency with the constant air monitor (CAM) alarm setpoint protocol; (2) consistency with Internal Dosimetry terminology; (3) an a priori determination of the potential risk to a worker; and (4) reduced complexity/error in field calculations. This paper outlines the justification for the conversion to DAC-hrs, the protocols used for field and count room calculations, and the implementation process utilized at the Savannah River Site« less

  2. Recognizing Politics in the Nursery: Early Childhood Education Institutions as Sites of Mundane Politics

    ERIC Educational Resources Information Center

    Millei, Zsuzsa; Kallio, Kirsi Pauliina

    2018-01-01

    In his inspirational article titled 'Bringing politics into the nursery', Peter Moss argues for early childhood institutions to "become" places of 'democratic political practice'. In this article, the authors add to Moss's call and argue that these institutions are sites of 'mundane political practice', containing various attitudinal…

  3. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  4. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  5. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  6. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  7. Approaches to Streamline Air Permitting for Combined Heat and Power: Permits by Rule and General Permits

    EPA Pesticide Factsheets

    This factsheet provides information about permit by rule (PBR) and general permit (GP) processes, including the factors that contributed to their development and lessons learned from their implementation.

  8. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...

  9. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  10. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  11. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  12. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  13. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  14. 40 CFR 63.78 - Early reduction demonstration evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Early reduction demonstration... Regulations Governing Compliance Extensions for Early Reductions of Hazardous Air Pollutants § 63.78 Early reduction demonstration evaluation. (a) The permitting authority will evaluate an early reduction...

  15. 40 CFR 63.78 - Early reduction demonstration evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Early reduction demonstration... Regulations Governing Compliance Extensions for Early Reductions of Hazardous Air Pollutants § 63.78 Early reduction demonstration evaluation. (a) The permitting authority will evaluate an early reduction...

  16. Advancing family health through the Garden of Eatin': on-site food gardens in early childhood education.

    PubMed

    Chaufan, Claudia; Yeh, Jarmin; Sigal, Byron

    2015-04-01

    Nutritional practices develop over the life course. Developing healthy habits at an early age can contribute to combating increasing child obesity rates. Through a range of activities that rely on the presence of an on-site food garden, North Bay Children's Center (NBCC), an early childhood education program, has enacted a "culture of health" into all aspects of the curriculum to promote healthy eating practices among children, families, teachers and staff. NBCC's garden program serves as a model in early childhood education and as a community-based intervention to improve family health and prevent child obesity.

  17. Centrosome movement in the early divisions of Caenorhabditis elegans: A cortical site determining centrosome position

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hyman, A.A.

    1989-09-01

    In Caenorhabditis elegans embryos, early blastomeres of the P cell lineage divide successively on the same axis. This axis is a consequence of the specific rotational movement of the pair of centrosomes and nucleus. A laser has been used to perturb the centrosome movements that determine the pattern of early embryonic divisions. The results support a previously proposed model in which a centrosome rotates towards its correct position by shortening of connections, possibly microtubules, between a centrosome and a defined site on the cortex of the embryo.

  18. 76 FR 3092 - Endangered Species Permit No. 1578-01 and Permit No. 1595-04

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Species Permit No. 1578-01 and Permit No. 1595-04 AGENCY: National Marine Fisheries Service (NMFS... research permits (Permit Nos. 1578 and 1595- 03) to take shortnose sturgeon for purposes of scientific... State House Station, Augusta, ME, 04333 (Permit No. 1578); and Michael M. Hastings, University of Maine...

  19. 75 FR 58350 - Endangered Species; Permit No. 1578-01; and Permit No. 1595-04

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Species; Permit No. 1578-01; and Permit No. 1595-04 AGENCY: National Marine Fisheries Service (NMFS... modifications to permits (Permit Nos. 1578 and 1595-03) to take shortnose sturgeon for purposes of scientific... State House Station, Augusta, ME, 04333 (Permit No. 1578); and Michael M. Hastings, University of Maine...

  20. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  1. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  2. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  3. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  4. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  5. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  6. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  7. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  8. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  9. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  10. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  11. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  12. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  13. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  14. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  15. 77 FR 66406 - Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ...-1231-9BPP] RIN 1018-AZ16 Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven... requirements of the Migratory Bird Permits Program and assigned OMB control number 1018- 0022, which expires... chapter I, title 50 of the Code of Federal Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1...

  16. Effect of Unshaven Hair with Absorbable Sutures and Early Postoperative Shampoo on Cranial Surgery Site Infection.

    PubMed

    Oh, Won-Oak; Yeom, Insun; Kim, Dong-Seok; Park, Eun-Kyung; Shim, Kyu-Won

    2018-01-01

    Cranial surgical site infection is a significant cause of morbidity and mortality in hospitals. Preoperative hair shaving for cranial neurosurgical procedures is performed traditionally in an attempt to protect patients against complications from infections at cranial surgical sites. However, preoperative shaving of surgical incision sites using traditional surgical blades without properly washing the head after surgery can cause infections at surgical sites. Therefore, a rapid protocol in which the scalp remains unshaven and absorbable sutures are used for scalp closure with early postoperative shampooing is examined in this study. A retrospective comparative study was conducted from January 2008 to December 2012. A total of 2,641 patients who underwent unshaven cranial surgery with absorbable sutures for scalp closure were enrolled in this study. Data of 1,882 patients who underwent surgery with the traditional protocol from January 2005 to December 2007 were also analyzed for comparison. Of 2,641 patients who underwent cranial surgery with the rapid protocol, all but 2 (0.07%) patients experienced satisfactory wound healing. Of 1,882 patients who underwent cranial surgery with the traditional protocol, 3 patients (0.15%) had infections. Each infection occurred at the superficial incisional surgical site. Unshaven cranial surgery using absorbable sutures for scalp closure with early postoperative shampooing is safe and effective in the cranial neurosurgery setting. This protocol has a positive psychological effect. It can help patients accept neurosurgical procedures and improve their self-image after the operation. © 2017 S. Karger AG, Basel.

  17. BP America Treating Site #9 Compressor Station... Status of PSD and Title V permits following decommissioning of site

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. Maternally expressed PGK-Cre transgene as a tool for early and uniform activation of the Cre site-specific recombinase.

    PubMed

    Lallemand, Y; Luria, V; Haffner-Krausz, R; Lonai, P

    1998-03-01

    A transgenic mouse strain with early and uniform expression of the Cre site-specific recombinase is described. In this strain, PGK-Crem, Cre is driven by the early acting PGK-1 promoter, but, probably due to cis effects at the integration site, the recombinase is under dominant maternal control. When Cre is transmitted by PGK-Crem females mated to males that carry a reporter transgene flanked by loxP sites, even offspring that do not inherit PGK-Cre delete the target gene. It follows that in the PGK-Crem female Cre activity commences in the diploid phase of oogenesis. In PGK-Crem crosses complete recombination was observed in all organs, including testis and ovary. We prepared a mouse stock that is homozygous for PGK-Crem and at the albino (c) locus. This strain will be useful for the early and uniform induction of ectopic and dominant negative mutations, for the in vivo removal of selective elements from targeted mutations and in connection with the manipulation of targeted loci in 'knock in' and related technologies.

  19. Report of the Peer Review Panel on the early site suitability evaluation of the Potential Repository Site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-01-01

    The US Department of Energy (DOE) Yucca mountain Site Characterization Project Office (YMPO) assigned Science Applications International Corporation (SAIC), the Technical and Management Support Services (T&MSS) contractor to the YmPo, the task of conducting an Early Site Suitability Evaluation (ESSE) of the Yucca mountain site as a potential site for a high-level radioactive waste repository. First, the assignment called for the development of a method to evaluate a single site against the DOE General Guidelines for Recommendation of Sites for Nuclear Waste Repositories, 10 CFR Part 960. Then, using this method, an evaluation team, the ESSE Core Team, of seniormore » YMP scientists, engineers, and technical experts, evaluated new information obtained about the site since publication of the final Environmental Assessment (DOE, 1986) to determine if new suitability/unsuitability findings could be recommended. Finally, the Core Team identified further information and analyses needed to make final determinations for each of the guidelines. As part of the task, an independent peer review of the ESSE report has been conducted. Expertise was solicited that covered the entire spectrum of siting guidelines in 10 CFR Part 960 in order to provide a complete, in-depth critical review of the data evaluated and cited in the ESSE report, the methods used to evaluate the data, and the conclusions and recommendations offered by the report. Fourteen nationally recognized technical experts (Table 2) served on the Peer Review Panel. The comments from the Panel and the responses prepared by the ESSE Core Team, documented on formal Comment Response Forms, constitute the body of this document.« less

  20. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  1. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  2. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  3. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  4. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  5. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regulations: (1) Department of Ecology: Surface Water Rights Permit, RCW 90.03.250 Dam Safety Approval, RCW 90... deny a permit application to the Washington Department of Natural Resources, the Department of Ecology...

  6. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... regulations: (1) Department of Ecology: Surface Water Rights Permit, RCW 90.03.250 Dam Safety Approval, RCW 90... deny a permit application to the Washington Department of Natural Resources, the Department of Ecology...

  7. 50 CFR 622.50 - Permits, permit moratorium, and endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Shrimp Fishery of the Gulf of Mexico § 622.50 Permits, permit moratorium, and... Fishery Management Plan for the Shrimp Fishery of the Gulf of Mexico (Gulf Shrimp FMP), all commercial...

  8. NPDES Permit Writers' Course

    EPA Pesticide Factsheets

    The objective of the NPDES permit writers' course is to provide the basic regulatory framework and technical considerations that support the development of wastewater discharge permits as required under the NPDES Permit Program.

  9. 75 FR 352 - FFP Qualified Hydro 18 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Hydro 18 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydro 18 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal... electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site...

  10. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  11. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  12. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  13. 9 CFR 82.13 - Denial and withdrawal of permits and special permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PRODUCTS NEWCASTLE DISEASE AND CHLAMYDIOSIS Newcastle Disease § 82.13 Denial and withdrawal of permits and... prevent the dissemination of Newcastle disease, or, in the case of a special permit, that the special... threatens the public health, interest, or safety. The Administrator will send the person to whom the permit...

  14. Wooden tools and fire technology in the early Neanderthal site of Poggetti Vecchi (Italy).

    PubMed

    Aranguren, Biancamaria; Revedin, Anna; Amico, Nicola; Cavulli, Fabio; Giachi, Gianna; Grimaldi, Stefano; Macchioni, Nicola; Santaniello, Fabio

    2018-02-27

    Excavations for the construction of thermal pools at Poggetti Vecchi (Grosseto, Tuscany, central Italy) exposed a series of wooden tools in an open-air stratified site referable to late Middle Pleistocene. The wooden artifacts were uncovered, together with stone tools and fossil bones, largely belonging to the straight-tusked elephant Paleoloxodon antiquus The site is radiometrically dated to around 171,000 y B.P., and hence correlated with the early marine isotope stage 6 [Benvenuti M, et al. (2017) Quat Res 88:327-344]. The sticks, all fragmentary, are made from boxwood ( Buxus sempervirens ) and were over 1 m long, rounded at one end and pointed at the other. They have been partially charred, possibly to lessen the labor of scraping boxwood, using a technique so far not documented at the time. The wooden artifacts have the size and features of multipurpose tools known as "digging sticks," which are quite commonly used by foragers. This discovery from Poggetti Vecchi provides evidence of the processing and use of wood by early Neanderthals, showing their ability to use fire in tool making from very tough wood.

  15. Early prediction of eruption site using lightning location data: Estimates of accuracy during past eruptions

    NASA Astrophysics Data System (ADS)

    Nína Petersen, Guðrún; Arason, Þórður; Bjornsson, Halldór

    2013-04-01

    Eruption of subglacial volcanoes may lead to catastrophic floods and therefore early determination of the exact eruption site may be critical to civil protection evacuation plans. Poor visibility due to weather or darkness often inhibit positive identification of exact eruption location for many hours. However, because of the proximity and abundance of water in powerful subglacial volcanic eruptions, they are probably always accompanied by early lightning activity in the volcanic column. Lightning location systems, designed for weather thunderstorm monitoring, based on remote detection of electromagnetic waves from lightning, can provide valuable real-time information on location of eruption site. Important aspect of such remote detection is its independence of weather, apart from thunderstorms close to the volcano. Individual lightning strikes can be 5-10 km in length and are sometimes tilted and to the side of the volcanic column. This adds to the lightning location uncertainty, which is often a few km. Furthermore, the volcanic column may be swayed by the local wind to one side. Therefore, location of a single lightning can be misleading but by calculating average location of many lightning strikes and applying wind correction a more accurate eruption site location can be obtained. In an effort to assess the expected accuracy, the average lightning locations during the past five volcanic eruptions in Iceland (1998-2011) were compared to the exact site of the eruption vent. Simultaneous weather thunderstorms might have complicated this analysis, but there were no signs of ordinary thunderstorms in Iceland during these eruptions. To identify a suitable wind correction, the vector wind at the 500 hPa pressure level (5-6 km altitude) was compared to mean lightning locations during the eruptions. The essential elements of a system, which predicts the eruption site during the first hour(s) of an eruption, will be described.

  16. Nevada NPDES Permits

    EPA Pesticide Factsheets

    In Nevada, EPA’s Pacific Southwest (Region 9) issues all NPDES permits for any discharges on tribal lands. All other NPDES permits are issued by the Nevada Division of Environmental Protection (NDEP).

  17. Overview of prohibited and permitted plant regulatory listing systems

    USGS Publications Warehouse

    Westbrooks, Randy G.; Tasker, Alan V.

    2011-01-01

    Pest risk analysis is a process that evaluates the risks involved with a proposed species to help determine whether it should be permitted or denied entry into a country, and how the risks could be managed if it is imported. The prohibited listing approach was developed in the late 1800s and early 1900s in response to outbreaks of plant and animals pests such as foot and mouth disease of livestock, Mediterranean fruitfly (Ceratitis capitata Wiedemann), and Gypsy moth (Lymantria dispar L.). Under this approach, selected species of concern are evaluated to determine if they should be regulated for entry. Under the permitted listing approach that was first used on a national level in Australia in the 1990s, all species that are proposed for introduction are assessed to determine if they should be regulated.

  18. Permitting of Landfill Bioreactor Operations: Ten Years after the RD&D Rule

    EPA Science Inventory

    Prior to promulgation of the Rule, there were approximately 20 full-scale bioreactor projects in North America, including one in Canada. Of these, six were permitted by EPA (four Project XL sites and two projects listed separately under a cooperative research agreement at the Ou...

  19. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  20. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  1. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  2. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  3. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  4. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  5. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  6. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  7. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  8. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  9. Georgia Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  10. Alabama Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  11. Kentucky Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  12. Mississippi Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  13. Tennessee Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  14. Florida Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  15. Early to middle Miocene climate evolution: benthic oxygen and carbon isotope records from Walvis Ridge Site 1264.

    NASA Astrophysics Data System (ADS)

    Lourens, L. J.; Beddow, H.; Liebrand, D.; Schrader, C.; Hilgen, F. J.

    2016-12-01

    Across the early to middle Miocene, high-resolution records from the Pacific Ocean indicate a dynamic climate system, encompassing a 2 Myr global warming event from 17 Ma to 14.7 Ma, followed by a major Cenozoic cooling step at 14.2 Ma -13.8 Ma. Currently, no high-resolution benthic record from the Atlantic Ocean exists covering both events, limiting global coverage of this intriguing period in Cenozoic climate evolution. Here, we present the first early to middle Miocene high-resolution from the Atlantic basin. These records, from Site 1264 on the Walvis Ridge, span a 5.5 Myr long interval (13.24-18.90 ma) in high temporal resolution ( 4 kyr) and are tuned to eccentricity. The d18O record shows a sudden (high-latitude) warming/deglaciation on Antarctica at 17.1 Ma, a rapid cooling/glaciation of Antarctica at 13.8 Ma, and high-amplitude ( 1‰) variability on astronomical time-scales throughout this interval. Together with other records from this time interval located in the Pacific, which show similar features, the data strongly suggests a highly dynamic global climate system. We find cooling steps in d18O at 14.7, 14.2 and 13.8 Ma, suggesting concurrent cooling in the Pacific and Atlantic deep waters during the MMCT. The benthic foraminiferal stable isotope records reveal that the dominant astronomical frequencies present at ODP Site 1264 during the early to middle Miocene interval are the 405 kyr and 110 kyr eccentricity periodicities. This is a contrast to other early to middle Miocene records from drill-sites in the Pacific and South China Sea, which show a strong expression of obliquity in particular between 14.2 and 14.7 Ma.

  16. 50 CFR 665.801 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... qualifying for, or renewing, limited access permits. In making such decision, the Administrator will review... American Samoa longline limited access permit initial permit decision, the Regional Administrator will... Hawaii longline limited access permit if that vessel is used: (1) To fish for western Pacific pelagic MUS...

  17. 14 CFR 420.30 - Launch site location review for permitted launch vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.30 Launch site location review for...

  18. 14 CFR 420.30 - Launch site location review for permitted launch vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.30 Launch site location review for...

  19. Permitting of Landfill Bioreactor Operations: Ten Years after ...

    EPA Pesticide Factsheets

    Prior to promulgation of the Rule, there were approximately 20 full-scale bioreactor projects in North America, including one in Canada. Of these, six were permitted by EPA (four Project XL sites and two projects listed separately under a cooperative research agreement at the Outer Loop Landfill in Kentucky). In March 2014, there were about 40 bioreactor projects reported, including 30 active RD&D projects in 11 approved states and one project on tribal lands. Wisconsin features the largest number of projects at 13, due primarily to the fact that landfill owners in the state must either eliminate landfill disposal of biodegradable materials or to achieve the complete stabilization of deposited organic waste at MSW landfills within 40 years after closure. Most landfill operators have selected a bioreactor approach to attempt to achieve the latter goal. In summary, only 16 of 50 (32%) states have currently adopted the Rule, meaning that development of RD&D permitting procedures that are consistent with EPA’s requirements has generally not occurred. The predominant single reason cited for not adopting the Rule was lack of interest amongst landfill facilities in the state. Subtitle D and its state derivatives already allow leachate recirculation over prescriptive (i.e., minimum technology) liner systems, which is often the primary goal of site operators seeking to control leachate treatment costs. Other reasons related to concerns over increased time, cost

  20. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  1. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  2. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  3. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  4. Hominin teeth from the early Late Pleistocene site of Xujiayao, Northern China.

    PubMed

    Xing, Song; Martinón-Torres, María; Bermúdez de Castro, Jose María; Wu, Xiujie; Liu, Wu

    2015-02-01

    It is generally accepted that from the late Middle to the early Late Pleistocene (∼340-90 ka BP), Neanderthals were occupying Europe and Western Asia, whereas anatomically modern humans were present in the African continent. In contrast, the paucity of hominin fossil evidence from East Asia from this period impedes a complete evolutionary picture of the genus Homo, as well as assessment of the possible contribution of or interaction with Asian hominins in the evolution of Homo sapiens and Homo neanderthalensis. Here we present a comparative study of a hominin dental sample recovered from the Xujiayao site, in Northern China, attributed to the early Late Pleistocene (MIS 5 to 4). Our dental study reveals a mosaic of primitive and derived dental features for the Xujiayao hominins that can be summarized as follows: i) they are different from archaic and recent modern humans, ii) they present some features that are common but not exclusive to the Neanderthal lineage, and iii) they retain some primitive conformations classically found in East Asian Early and Middle Pleistocene hominins despite their young geological age. Thus, our study evinces the existence in China of a population of unclear taxonomic status with regard to other contemporary populations such as H. sapiens and H. neanderthalensis. The morphological and metric studies of the Xujiayao teeth expand the variability known for early Late Pleistocene hominin fossils and suggest the possibility that a primitive hominin lineage may have survived late into the Late Pleistocene in China. Copyright © 2014 Wiley Periodicals, Inc.

  5. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  6. 43 CFR 5.3 - How do I apply for a permit?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false How do I apply for a permit? 5.3 Section 5.3 Public Lands: Interior Office of the Secretary of the Interior COMMERCIAL FILMING AND SIMILAR..., contact the site manager at the location at which you seek to conduct commercial filming or still...

  7. 43 CFR 5.3 - How do I apply for a permit?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false How do I apply for a permit? 5.3 Section 5.3 Public Lands: Interior Office of the Secretary of the Interior COMMERCIAL FILMING AND SIMILAR..., contact the site manager at the location at which you seek to conduct commercial filming or still...

  8. 78 FR 72830 - Migratory Bird Permits; Delegating Falconry Permitting Authority to 17 States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ...-0110; FF09M21200-134-FXMB1231099BPP0] RIN 1018-BA01 Migratory Bird Permits; Delegating Falconry... Migratory Bird Permits Program and assigned OMB control number 1018-0022, which expires February 28, 2014... Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1. The authority citation for part 21 continues to...

  9. 40 CFR 124.9 - Administrative record for draft permits when EPA is the permitting authority.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Administrative record for draft permits....9 Administrative record for draft permits when EPA is the permitting authority. (a) The provisions of a draft permit prepared by EPA under § 124.6 shall be based on the administrative record defined...

  10. 50 CFR 622.90 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Red Drum Fishery of the Gulf of Mexico § 622.90 Permits. (a) Dealer permits and conditions—(1) Permits. For a dealer to first receive Gulf red drum harvested in or from the EEZ, a Gulf and South Atlantic dealer permit must be issued...

  11. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Applicability. (1) The owner of any vessel used to fish for lobster in Permit Area 1 must have a limited access permit issued for such vessel. (2) The owner of any vessel used to fish for lobster in Permit Area 2 must... ownership in the partnership or corporation. (d) Lobster Limited Access Permit Requirements. (1) A lobster...

  12. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Applicability. (1) The owner of any vessel used to fish for lobster in Permit Area 1 must have a limited access permit issued for such vessel. (2) The owner of any vessel used to fish for lobster in Permit Area 2 must... ownership in the partnership or corporation. (d) Lobster Limited Access Permit Requirements. (1) A lobster...

  13. Saugus Iron Works: Life and Work at an Early American Industrial Site. Teaching with Historic Places.

    ERIC Educational Resources Information Center

    Whitman, Maryann

    In 1948 archeologists verified that a now overgrown and urbanized landscape along the Saugus River (Massachusetts) was the site of the Saugus Iron Works from 1646 until 1648. That discovery led to a careful, though partly conjectural, reconstruction of the first successful integrated ironmaking plant in the colonial America. The early Puritan…

  14. Order Responding to Petitions for the Administrator to Object to the Department of Energy's Hanford Site Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  16. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  17. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  18. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  19. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  20. 9 CFR 104.2 - Permit authorized.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... permits for importing biological products. They shall be: (1) U.S. Veterinary Biological Product Permit for Research and Evaluation; (2) U.S. Veterinary Biological Product Permit for Distribution and Sale; or (3) U.S. Veterinary Biological Product Permit for Transit Shipment Only. (b) A permit shall not be...

  1. 9 CFR 104.2 - Permit authorized.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... permits for importing biological products. They shall be: (1) U.S. Veterinary Biological Product Permit for Research and Evaluation; (2) U.S. Veterinary Biological Product Permit for Distribution and Sale; or (3) U.S. Veterinary Biological Product Permit for Transit Shipment Only. (b) A permit shall not be...

  2. 78 FR 53436 - Improving Performance of Federal Permitting and Review of Infrastructure Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... an efficient decision-making process within each agency; to the extent possible, unifying and... IIP Process, the developer is encouraged to inform DOE in writing as soon as possible of its decision... to improve the performance of Federal siting, permitting, and review processes for infrastructure...

  3. 76 FR 81932 - Auction of FM Broadcast Construction Permits; Revised Construction Permit Number in Auction 93

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Construction Permits; Revised Construction Permit Number in Auction 93 AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: This document announces a change to the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR FURTHER INFORMATION CONTACT: Linda...

  4. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  5. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  6. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  7. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  8. STATIC AND KINETIC SITE-SPECIFIC PROTEIN-DNA PHOTOCROSSLINKING: ANALYSIS OF BACTERIAL TRANSCRIPTION INITIATION COMPLEXES

    PubMed Central

    Naryshkin, Nikolai; Druzhinin, Sergei; Revyakin, Andrei; Kim, Younggyu; Mekler, Vladimir; Ebright, Richard H.

    2009-01-01

    Static site-specific protein-DNA photocrosslinking permits identification of protein-DNA interactions within multiprotein-DNA complexes. Kinetic site-specific protein-DNA photocrosslinking--involving rapid-quench-flow mixing and pulsed-laser irradiation--permits elucidation of pathways and kinetics of formation of protein-DNA interactions within multiprotein-DNA complexes. We present detailed protocols for application of static and kinetic site-specific protein-DNA photocrosslinking to bacterial transcription initiation complexes. PMID:19378179

  9. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application for a permit in whole or in part, and may...

  10. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application for a permit in whole or in part, and may...

  11. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application for a permit in whole or in part, and may...

  12. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application for a permit in whole or in part, and may...

  13. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  14. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  15. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  16. Effects of site preparation treatments on early growth and survival of planted longleaf pine (Pinus palustris Mill.) seedlings in North Carolina

    Treesearch

    Benjamin O. Knapp; G. Geoff Wang; Joan L. Walker; Susan Cohen

    2006-01-01

    We tested the effects of eight site preparation treatments on early growth and survival of container-grown longleaf pine (Pinus palustris Mill.) seedlings. Treatments included an untreated check, six combinations of two initial vegetation control treatments (chopping or herbicide) with three planting site conditions (flat [no additional treatment],...

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  18. 33 CFR 325.5 - Forms of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) DA permits under this regulation will be in the form of individual permits or general permits. The basic format shall be ENG Form 1721, DA Permit (Appendix A). (2) The general conditions included in ENG... be required. (2) Nationwide permits. Nationwide permits are a type of general permit and represent DA...

  19. 40 CFR 124.203 - How may I switch from my individual RCRA permit to a standardized permit?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true How may I switch from my individual RCRA permit to a standardized permit? 124.203 Section 124.203 Protection of Environment ENVIRONMENTAL... Permit Applying for A Standardized Permit § 124.203 How may I switch from my individual RCRA permit to a...

  20. 40 CFR 124.203 - How may I switch from my individual RCRA permit to a standardized permit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false How may I switch from my individual RCRA permit to a standardized permit? 124.203 Section 124.203 Protection of Environment ENVIRONMENTAL... Permit Applying for A Standardized Permit § 124.203 How may I switch from my individual RCRA permit to a...

  1. 40 CFR 124.203 - How may I switch from my individual RCRA permit to a standardized permit?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false How may I switch from my individual RCRA permit to a standardized permit? 124.203 Section 124.203 Protection of Environment ENVIRONMENTAL... Permit Applying for A Standardized Permit § 124.203 How may I switch from my individual RCRA permit to a...

  2. 40 CFR 124.203 - How may I switch from my individual RCRA permit to a standardized permit?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false How may I switch from my individual RCRA permit to a standardized permit? 124.203 Section 124.203 Protection of Environment ENVIRONMENTAL... Permit Applying for A Standardized Permit § 124.203 How may I switch from my individual RCRA permit to a...

  3. 40 CFR 124.203 - How may I switch from my individual RCRA permit to a standardized permit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false How may I switch from my individual RCRA permit to a standardized permit? 124.203 Section 124.203 Protection of Environment ENVIRONMENTAL... Permit Applying for A Standardized Permit § 124.203 How may I switch from my individual RCRA permit to a...

  4. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for... from property lines and public roads are met. (b) Alterations. Prior to making any alteration to a home...) Installation of on-site structures. Each accessory building and structure is designed to support all of its own...

  5. The archaeology, chronology and stratigraphy of Madjedbebe (Malakunanja II): A site in northern Australia with early occupation.

    PubMed

    Clarkson, Chris; Smith, Mike; Marwick, Ben; Fullagar, Richard; Wallis, Lynley A; Faulkner, Patrick; Manne, Tiina; Hayes, Elspeth; Roberts, Richard G; Jacobs, Zenobia; Carah, Xavier; Lowe, Kelsey M; Matthews, Jacqueline; Florin, S Anna

    2015-06-01

    Published ages of >50 ka for occupation at Madjedbebe (Malakunanja II) in Australia's north have kept the site prominent in discussions about the colonisation of Sahul. The site also contains one of the largest stone artefact assemblages in Sahul for this early period. However, the stone artefacts and other important archaeological components of the site have never been described in detail, leading to persistent doubts about its stratigraphic integrity. We report on our analysis of the stone artefacts and faunal and other materials recovered during the 1989 excavations, as well as the stratigraphy and depositional history recorded by the original excavators. We demonstrate that the technology and raw materials of the early assemblage are distinctive from those in the overlying layers. Silcrete and quartzite artefacts are common in the early assemblage, which also includes edge-ground axe fragments and ground haematite. The lower flaked stone assemblage is distinctive, comprising a mix of long convergent flakes, some radial flakes with faceted platforms, and many small thin silcrete flakes that we interpret as thinning flakes. Residue and use-wear analysis indicate occasional grinding of haematite and woodworking, as well as frequent abrading of platform edges on thinning flakes. We conclude that previous claims of extensive displacement of artefacts and post-depositional disturbance may have been overstated. The stone artefacts and stratigraphic details support previous claims for human occupation 50-60 ka and show that human occupation during this time differed from later periods. We discuss the implications of these new data for understanding the first human colonisation of Sahul. Copyright © 2015 Elsevier Ltd. All rights reserved.

  6. South Carolina Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  7. North Carolina Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  8. PSD Permit Applications In Region 4

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  9. Evaluation of Streamflow, Water Quality, and Permitted and Nonpermitted Loads and Yields in the Raritan River Basin, New Jersey, Water Years 1991-98

    USGS Publications Warehouse

    Reiser, Robert G.

    2003-01-01

    Seventeen water-quality constituents were analyzed in samples collected from 21 surface-water sampling sites in the Raritan River Basin during water years 1991-97. Loads were computed for seven constituents. Thirteen constituents have associated instream water-quality standards that are used as reference levels when evaluating the data. Nine of the 13 constituents did not meet water-quality reference levels in all samples at all sites. The constituents that most commonly failed to meet the water-quality reference levels in the 801 samples analyzed were total phosphorus (greater than 0.1 mg/L (milligrams per liter) in 32 percent of samples), fecal coliform bacteria (greater than 400 counts/100 milliliters in 29 percent), hardness (less than 50 mg/L in 21 percent), pH (greater than 8.5 or less than 6.5 in 17 percent), and water temperature in designated trout waters (greater than 20 degrees Celsius in 12 percent of samples). Concentrations of chloride, total dissolved solids, nitrate plus nitrite, and sulfate did not exceed water-quality reference levels in any sample. Results from previous studies on pesticides and volatile organic compounds in streamwater during 1996-98, and organic compounds and trace elements in sediments during 1976-93, were summarized for this study. Concentrations of pesticides in some samples exceeded the relevant standards. Water-quality data varied significantly as season and streamflow changed. Concentrations or values of 12 constituents were significantly higher in the growing season than in the nongrowing season at 1 to 21 sites, and concentrations of 6 constituents were significantly higher in the nongrowing season at 1 to 21 sites. Concentrations or values of seven constituents decreased significantly with increased streamflow, indicating a more significant contribution from base flow or permitted sources than from runoff. Concentrations or values of four constituents increased with increased flow, indicating a more significant

  10. An Early Pleistocene high-resolution paleoclimate reconstruction from the West Turkana (Kenya) HSPDP drill site

    NASA Astrophysics Data System (ADS)

    Stockhecke, Mona; Beck, Catherine; Brown, Erik T.; Cohen, Andrew; Deocampo, Daniel M.; Feibel, Craig S.; Pelletier, Jon D.; Rabideaux, Nathane M.; Sier, Mark

    2016-04-01

    The Hominin Sites and Paleolakes Drilling Project (HSPDP), and the related Olorgesailie Drilling Project (ODP), recovered ~2 km of drill core since 2012. At the HSPDP West Turkana Kaitio (WTK) site a 216 m-long core that covers the Early Pleistocene time window (1.3 to 1.87 Ma) during which hominids first expanded out of Africa and marine records document reorganization of tropical climate and the development of the strong Walker circulation. WTK carries particular interest for paleoclimate and paleoenvironmental reconstructions as it is located only 2.5 km from the location of one of the most complete hominin skeletons ever recovered (Nariokotome Boy). XRF core scanning data provide a means of evaluating records of past environmental conditions continuously and at high resolution. However, the record contains complex lithologies reflecting repeated episodes of inundation and desiccation along a dynamic lake margin. Here we present a methodological approach to address the highly variable lithostratigraphy of the East African records to establish comprehensive paleoclimate timeseries. The power spectrum of the presented hydroclimate record peaks at Milankovitch cycles, qualifying HSPDP drill cores from the Turkana Basin to be used as high-resolution Early Pleistocene paleoclimate archive. Comparing these data with marine climate reconstructions sheds light into athmospheric processes and continental climate dynamics.

  11. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application...

  12. 50 CFR 13.27 - Permit suspension.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permit suspension. 13.27 Section 13.27... GENERAL PERMIT PROCEDURES Permit Administration § 13.27 Permit suspension. (a) Criteria for suspension..., the reason(s) for such suspension, the actions necessary to correct the deficiencies, and inform the...

  13. 50 CFR 622.270 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Dolphin and Wahoo Fishery Off the Atlantic States § 622.270 Permits. (a) Commercial vessel permits. (1) For a person aboard... the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must...

  14. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric..., shoot at, poison, wound, kill, capture, trap, collect, destroy, molest, or disturb'' (Sec. 22.3). The...

  15. 50 CFR 660.25 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 13 2014-10-01 2014-10-01 false Permits. 660.25 Section 660.25 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE (CONTINUED) FISHERIES OFF WEST COAST STATES West Coast Groundfish Fisheries § 660.25 Permits. (a) General. Each of the permits...

  16. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  17. Major early Eocene carbon cycle perturbations and changes in planktic foraminiferal assemblages from the southeast Atlantic Ocean (ODP Site 1263)

    NASA Astrophysics Data System (ADS)

    Luciani, Valeria; D'Onofrio, Roberta; Dickens, Gerald Roy; Wade, Bridget

    2017-04-01

    On a paleoclimatic perspective the early Paleogene represents one of the most interesting and dynamic intervals of the Earth's history. Present record indicates that the Earth climate system reached its Cenozoic maximum peak of global warming and probably of pCO2 during the early Eocene climatic optimum (EECO, 49-53 Ma). Superimposed to the general trend, our planet experienced short-term ( 40-200 kyr) repeated peaks in global temperatures and major changes in the carbon cycle, known as hyperthermals. Great scientific interest has been focused on the early Paleogene hyperthermal events, given the assumed similarity with the current climatic scenario. Less attention has been dedicated to the EECO long lasting perturbation of extraordinary warming thus many characters of this interval still remain largely unconstrained, especially as for the biotic response. We present here results on early Eocene planktic foraminiferal analysis from the southeast Atlantic Ocean Drilling Program (ODP) Site 1263 (Walvis Ridge, Leg 208) to explore possible relationship between changes in assemblages and carbon cycle perturbation. The time interval is of particular interest for an abrupt switch occurred at low-latitude of the northern hemisphere between two important calcifiers of the tropical-subtropical early Paleogene oceans, the genera Morozovella and Acarinina at the carbon isotopic excursion known as J event, at the EECO onset. Precisely, the relative abundance of Morozovella permanently decreased by at least half, along with a progressive decrease in the number of species. Concomitantly, Acarinina almost doubled its abundance and diversified. Site 1263 was located during the early Eocene at a latitude of 40° south therefore representing a temperate setting of southern hemisphere not yet explored for planktic foraminiferal changes. We document a permanent decrease in Morozovella abundance at the beginning of the EECO, although this decline is delayed by 165 kyr with respect to

  18. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Permit number. 1210.21 Section 1210.21 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk...

  19. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permit number. 1210.21 Section 1210.21 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk...

  20. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  1. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  2. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  3. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  4. Learning curve and early clinical outcomes for a robotic surgery novice performing robotic single site cholecystectomy.

    PubMed

    Angus, Andrew A; Sahi, Saad L; McIntosh, Bruce B

    2014-06-01

    A rapid training protocol has been developed for robotic surgery novices to learn robotic single-incision techniques. This study assesses the learning curve and early clinical results for a robotic surgery novice starting single-site cholecystectomy. A chart review was performed on the surgeon's first 55 patients to undergo this procedure. Average patient age was 46.01 ± 4.25 (range 21-86) years and BMI was 26.57 ± 4.25 (range 19.4-36.6) kg/m(2) . The mean port placement with docking time was 11.34 ± 3.74 (range 7-23) min. Mean console time was 28.74 ± 11.04 (range 15-66) min. Average total OR time was 61.84 ± 14.66 (range 40-105) min. All procedures were successfully completed without conversion or added ports. Complications included several minor procedural gall bladder perforations and miscellaneous postoperative symptomatic complaints. Robotic single site cholecystectomy can be safely performed by a robotic novice within a minimal learning curve and have early clinical results that are comparable to the published data of robotic experts. Copyright © 2013 John Wiley & Sons, Ltd.

  5. 40 CFR 52.681 - Permits to construct and tier II operating permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.681 Permits... Permits issued by the Idaho Department of Environmental Quality in accordance with the Federally-approved State of Idaho Rules for Control of Air Pollution in Idaho, incorporated by reference in section 52.670...

  6. Permit Shields and NSR

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. 50 CFR 660.25 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... up to two times during the fishing season as long as the second change in vessel registration is back.... Limited entry permits will normally be registered for use with a particular vessel at the time the permit is issued, renewed, transferred, or replaced. If the permit will be used with a vessel other than the...

  8. 40 CFR 124.9 - Administrative record for draft permits when EPA is the permitting authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Administrative record for draft....9 Administrative record for draft permits when EPA is the permitting authority. (a) The provisions of a draft permit prepared by EPA under § 124.6 shall be based on the administrative record defined...

  9. 40 CFR 124.9 - Administrative record for draft permits when EPA is the permitting authority.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Administrative record for draft....9 Administrative record for draft permits when EPA is the permitting authority. (a) The provisions of a draft permit prepared by EPA under § 124.6 shall be based on the administrative record defined...

  10. 40 CFR 124.9 - Administrative record for draft permits when EPA is the permitting authority.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Administrative record for draft....9 Administrative record for draft permits when EPA is the permitting authority. (a) The provisions of a draft permit prepared by EPA under § 124.6 shall be based on the administrative record defined...

  11. 40 CFR 124.9 - Administrative record for draft permits when EPA is the permitting authority.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Administrative record for draft....9 Administrative record for draft permits when EPA is the permitting authority. (a) The provisions of a draft permit prepared by EPA under § 124.6 shall be based on the administrative record defined...

  12. 36 CFR 13.148 - Permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Permit application. 13.148... 1, 1978 § 13.148 Permit application. In order to obtain, renew or extend a permit, a claimant shall submit a written application. In the case of an application to renew or extend a permit issued pursuant...

  13. 36 CFR 13.148 - Permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit application. 13.148... 1, 1978 § 13.148 Permit application. In order to obtain, renew or extend a permit, a claimant shall submit a written application. In the case of an application to renew or extend a permit issued pursuant...

  14. Evoqua RCRA Permit Application and Draft Permit Documents

    EPA Pesticide Factsheets

    Documents pertaining to the proposed RCRA permit for the Evoqua Water Technologies LLC carbon regeneration facility located on the Colorado River Indian Tribes (CRIT) reservation near Parker, Arizona.

  15. 30 CFR 778.17 - Permit term.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR LEGAL, FINANCIAL, COMPLIANCE, AND RELATED INFORMATION § 778.17 Permit...

  16. 40 CFR 147.2906 - Emergency permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... substantial delay in oil or gas production, and injection will not result in movement of fluid into an USDW... permits to avoid a substantial delay in oil or gas production shall be issued only after a complete permit... notice procedure for a draft permit within 10 days after issuance. (3) An emergency permit may be oral or...

  17. 40 CFR 49.155 - Permit requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to your permit if you are subject to this program under § 49.153(a) for construction of a new... of the permit and the date by which you must commence construction in order for your permit to remain... determine compliance with the permit. For any such information claimed to be confidential, you must also...

  18. Pacopampa: Early evidence of violence at a ceremonial site in the northern Peruvian highlands.

    PubMed

    Nagaoka, Tomohito; Uzawa, Kazuhiro; Seki, Yuji; Morales Chocano, Daniel

    2017-01-01

    Pacopampa, a ceremonial complex in Peru's northern highlands, reveals early evidence of trauma in the Middle to Late Formative Period coinciding with the emergence of social stratification in the area. We examine the prevalence of trauma in human remains found at the site and present evidence of the circumstances surrounding the deaths of individuals who lived during the early stages of Andean civilization. The materials are the remains of 104 individuals (38 non-adult and 66 adult) from the Middle to Late Formative Periods. We explored trauma macroscopically and recorded patterns based on skeletons' locations, age at death, sex, social class, and chronology. We detected trauma in remains over the Middle to Late Formative Periods. While the prevalence of trauma was minimal in the Middle Formative Period, skeletons from the subsequent era exhibit more severe disturbances. However, all the skeletons show signs of healing and affected individuals experienced a low degree of trauma. Given the archaeological context (the remains were recovered from sites of ceremonial practices), as well as the equal distribution of trauma among both sexes and a lack of defensive architecture, it is plausible that rituals, rather than organized warfare or raids, caused most of the exhibited trauma. Pacopampa was home to a complex society founded on ritual activity in a ceremonial center: this is indicated by the presence of ritual violence in a society that built impressively large, ceremonial architecture and developed social stratification without any political control of surplus agricultural goods.

  19. 50 CFR 21.27 - Special purpose permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.27 Special purpose permits. Permits may be issued for special purpose activities related to migratory birds, their parts... special purpose permit for migratory bird related activities not otherwise provided for in this part may...

  20. 40 CFR 72.62 - Draft permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATION Federal Acid Rain Permit Issuance Procedures § 72.62 Draft permit. (a) After the Administrator receives a complete Acid Rain permit application and any supplemental information, the Administrator will...

  1. 40 CFR 72.62 - Draft permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATION Federal Acid Rain Permit Issuance Procedures § 72.62 Draft permit. (a) After the Administrator receives a complete Acid Rain permit application and any supplemental information, the Administrator will...

  2. 40 CFR 72.62 - Draft permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATION Federal Acid Rain Permit Issuance Procedures § 72.62 Draft permit. (a) After the Administrator receives a complete Acid Rain permit application and any supplemental information, the Administrator will...

  3. 40 CFR 72.62 - Draft permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATION Federal Acid Rain Permit Issuance Procedures § 72.62 Draft permit. (a) After the Administrator receives a complete Acid Rain permit application and any supplemental information, the Administrator will...

  4. 40 CFR 72.62 - Draft permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATION Federal Acid Rain Permit Issuance Procedures § 72.62 Draft permit. (a) After the Administrator receives a complete Acid Rain permit application and any supplemental information, the Administrator will...

  5. Automatic Commercial Permit Sets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grana, Paul

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  6. 50 CFR 622.20 - Permits and endorsements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... when an application for renewal is not received by the RA within 1 year of the expiration date of the... those permits, and the landings histories associated with those permits, into one permit must submit a completed permit consolidation application to the RA. The permits consolidated must be valid, non-expired...

  7. 10 CFR 100.23 - Geologic and seismic siting criteria.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Earthquake Ground Motion, and to permit adequate engineering solutions to actual or potential geologic and..., earthquake recurrence rates, fault geometry and slip rates, site foundation material, and seismically induced... Earthquake Ground Motion for the site, the potential for surface tectonic and nontectonic deformations, the...

  8. 10 CFR 100.23 - Geologic and seismic siting criteria.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Earthquake Ground Motion, and to permit adequate engineering solutions to actual or potential geologic and..., earthquake recurrence rates, fault geometry and slip rates, site foundation material, and seismically induced... Earthquake Ground Motion for the site, the potential for surface tectonic and nontectonic deformations, the...

  9. 10 CFR 100.23 - Geologic and seismic siting criteria.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Earthquake Ground Motion, and to permit adequate engineering solutions to actual or potential geologic and..., earthquake recurrence rates, fault geometry and slip rates, site foundation material, and seismically induced... Earthquake Ground Motion for the site, the potential for surface tectonic and nontectonic deformations, the...

  10. 40 CFR 72.83 - Administrative permit amendment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...

  11. 40 CFR 72.83 - Administrative permit amendment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...

  12. 40 CFR 72.83 - Administrative permit amendment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...

  13. 40 CFR 72.83 - Administrative permit amendment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...

  14. 40 CFR 72.83 - Administrative permit amendment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...

  15. 50 CFR 19.31 - State permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANTS (CONTINUED) AIRBORNE HUNTING State Permits and Annual Report Requirements § 19.31 State permits..., domestic animals, human life or crops. States may not issue permits for the purpose of sport hunting. (b...

  16. 50 CFR 19.31 - State permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANTS (CONTINUED) AIRBORNE HUNTING State Permits and Annual Report Requirements § 19.31 State permits. (a) Except as provided in § 19.3, States may issue permits to persons to engage in airborne hunting...

  17. 45 CFR 671.6 - Applications for permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Applications for permits. 671.6 Section 671.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.6 Applications for permits. (a) General content of permit applications. Each application for a permit shall be dated and signed...

  18. 45 CFR 671.6 - Applications for permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Applications for permits. 671.6 Section 671.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.6 Applications for permits. (a) General content of permit applications. Each application for a permit shall be dated and signed...

  19. 45 CFR 671.6 - Applications for permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Applications for permits. 671.6 Section 671.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.6 Applications for permits. (a) General content of permit applications. Each application for a permit shall be dated and signed...

  20. Early cannulation prosthetic graft (Acuseal) for arteriovenous access: a useful option to provide a personal vascular access solution.

    PubMed

    Aitken, Emma L; Jackson, Andrew J; Kingsmore, David B

    2014-01-01

    Early cannulation arteriovenous grafts (ecAVGs), such as the GORE Acuseal, have "low bleed" properties permitting cannulation within 24 hours of insertion. They may provide an alternative to tunneled central venous catheters (and associated line complications) in patients requiring urgent vascular access. We present our early experience of 37 patients treated with the GORE Acuseal ecAVG. A total of 11 upper limb, 24 lower limb and 2 complex graft procedures were performed. Indications for ecAVG were as follows: bridge to transplantation (21.6%); bridge to arteriovenous fistula (AVF) maturation (8.1%); AVF salvage (8.1%); no native options (67.6%, including 17 patients with bilateral central vein stenosis); 36 AVGs (97.3%) were successfully cannulated. Mean time to first cannulation: 30.4±23.4 hours (range: 2-192). Primary and secondary patency rates at 3, 6 and 12 months were 64.9%, 48.6%, 32.4% and 70.2%, 59.4%, 40.5% respectively. The systemic bacteremia rate was 0.2 per 1,000 access days. There was one perioperative death. Other complications included hematoma at cannulation sites (n=9), pseudoaneurysm (n=3) and local infection at graft site (n=6). A total of 26 of 37 patients (70.6%) achieved a "personal vascular access solution": bridge to transplantation (n=8), bridge to functioning AVF/interposition AVG (n=5), maintenance hemodialysis via ecAVG (n=13); death with functioning AVG (n=1). Early experience with the GORE Acuseal is encouraging. Patency and bacteremia rates are at least comparable to standard polytetrafluoroethylene grafts. ecAVGs have permitted cannulation within 24 hours of insertion and line avoidance in the majority of patients. Nearly three-quarters of patients achieved a definitive "personal vascular access solution" from their ecAVG.

  1. 50 CFR 13.42 - Permits are specific.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GENERAL PERMIT PROCEDURES Conditions § 13.42 Permits are specific. The authorizations on the face of a permit that set forth specific times, dates, places, methods of taking or carrying out the permitted...

  2. 78 FR 65388 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...

  3. 15 CFR 971.428 - Other necessary permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS Issuance/Transfer.... Each permit will provide that securing the deep seabed mining permit for activities described in the... Federal, State, and local permits. ...

  4. Chromium Toxicity Test for Fall Chinook Salmon (Oncorhynchus tshawytscha) Using Hanford Site Groundwater: Onsite Early Life-Stage Toxicity Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patton, Gregory W; Dauble, Dennis D; Chamness, Mickie A

    The objective of this study was to evaluate site-specific effects for early life-stage (eyed eggs to free swimming juveniles) fall chinook salmon that might be exposed to hexavalent chromium from Hanford groundwater sources. Our exposure conditions included hexavalent chromium obtained from Hanford groundwater wells near the Columbia River, Columbia River water as the diluent, and locally adapted populations of fall chinook salmon. This report describes both a 96-hr pretest using rainbow trout eggs and an early life-stage test beginning with chinook salmon eggs.

  5. 77 FR 58988 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... Act (Act) by WildEarth Guardians (Petitioner), to object to WDEQ's June 7, 2011 Permit (Permit) issued...Earth Petitioner dated August 4, 2011, requesting that EPA object to the issuance of the Permit to CLF&P...

  6. [System construction of early warning for ecological security at cultural and natural heritage mixed sites and its application: a case study of Wuyishan Scenery District].

    PubMed

    You, Wei-Bin; He, Dong-Jin; Qin, De-Hua; Ji, Zhi-Rong; Wu, Li-Yun; Yu, Jian-An; Chen, Bing-Rong; Tan, Yong

    2014-05-01

    This paper proposed a new concept of ecological security for protection by a comprehensive analysis of the contents and standards of world heritage sites. A frame concept model named "Pressure-State-Control" for early warning of ecological security at world heritage mixed sites was constructed and evaluation indicators of this frame were also selected. Wuyishan Scenery District was chosen for a case study, which has been severely disturbed by natural and artificial factors. Based on the frame model of "Pressure-State-Control" and by employing extension analysis, the matter-element model was established to assess the ecological security status of this cultural and natural world heritage mixed site. The results showed that the accuracy of ecological security early warning reached 84%. Early warning rank was I level (no alert status) in 1997 and 2009, but that in 2009 had a higher possibility to convert into II level. Likewise, the early-warning indices of sensitive ranks were different between 1997 and 2009. Population density, population growth rate, area index for tea garden, cultivated land owned per capita, level of drought, and investment for ecological and environmental construction were the main limiting factors to hinder the development of ecological security from 2009 to future. In general, the status of Wuyishan Scenery District ecological security was relatively good and considered as no alert level, while risk conditions also existed in terms of a few early-warning indicators. We still need to pay more attention to serious alert indicators and adopt effective prevention and control measures to maintain a good ecological security status of this heritage site.

  7. Archaeogeophysical investigations of early Caddo settlement patterning at the Crenshaw site (3MI6)

    NASA Astrophysics Data System (ADS)

    Samuelsen, John R.

    The Teran map, made during Don Domingo Teran de los Rios' expedition for New Spain, shows a Caddo settlement in 1691 with a vacant mound center and many small farmsteads dispersed across the countryside along both banks of the Red River. This map, combined with the 19th Century photographs taken by William Soule, provides a testable model for the settlement pattern of the Caddo people called the Teran-Soule model. This model states that large numbers of people besides a small caretaker population did not inhabit the mound centers, supporting a vacant mound center hypothesis. Recent studies have begun to challenge this hypothesis, using archaeogeophysical techniques to find structures near Middle to Late Caddo mounds. An archaeogeophysical survey of the Crenshaw site along the Great Bend of the Red River was conducted to determine if structures could be found there. Is the settlement pattern at this early Caddo site, occupied between A.D. 700 and 1400, consistent with the late historic model of a vacant mound center? Is there evidence that both Caddo and Fourche Maline occupations existed in horizontally distinct components? The 3.2 hectare survey identified more than 100 possible structures, of which more than 50 are probably structures associated with the Fourche Maline or early Caddo occupations of the site. Several structures were found in linear patterns, including an oval series of possible structures measuring 90 x 85 m in diameter. While cultural affiliation was not determined for most of these features, some can be attributed to Caddo origin based on architectural attributes, such as extended entranceways. This suggests that Crenshaw was not literally vacant, but the presence of extended entranceways suggests that some of the identified features were special use structures, which does not conflict with the vacant mound center hypothesis. However, the large number of possible structures present with unknown cultural affiliations provides ample opportunities

  8. Pacopampa: Early evidence of violence at a ceremonial site in the northern Peruvian highlands

    PubMed Central

    Uzawa, Kazuhiro; Seki, Yuji; Morales Chocano, Daniel

    2017-01-01

    Objectives Pacopampa, a ceremonial complex in Peru’s northern highlands, reveals early evidence of trauma in the Middle to Late Formative Period coinciding with the emergence of social stratification in the area. We examine the prevalence of trauma in human remains found at the site and present evidence of the circumstances surrounding the deaths of individuals who lived during the early stages of Andean civilization. Materials and methods The materials are the remains of 104 individuals (38 non-adult and 66 adult) from the Middle to Late Formative Periods. We explored trauma macroscopically and recorded patterns based on skeletons’ locations, age at death, sex, social class, and chronology. Results We detected trauma in remains over the Middle to Late Formative Periods. While the prevalence of trauma was minimal in the Middle Formative Period, skeletons from the subsequent era exhibit more severe disturbances. However, all the skeletons show signs of healing and affected individuals experienced a low degree of trauma. Discussion Given the archaeological context (the remains were recovered from sites of ceremonial practices), as well as the equal distribution of trauma among both sexes and a lack of defensive architecture, it is plausible that rituals, rather than organized warfare or raids, caused most of the exhibited trauma. Pacopampa was home to a complex society founded on ritual activity in a ceremonial center: this is indicated by the presence of ritual violence in a society that built impressively large, ceremonial architecture and developed social stratification without any political control of surplus agricultural goods. PMID:28957380

  9. 40 CFR 144.34 - Emergency permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Authorization by Permit § 144.34 Emergency permits. (a) Coverage... unless a temporary emergency permit is granted; or (2) A substantial and irretrievable loss of oil or gas...

  10. Insights into the Early to Late Oligocene Izu-Bonin Mariana Arc Magmatic History from Volcanic Minerals and Glass within Volcaniclastic Sediments of IODP Site U1438 and DSDP Site 296

    NASA Astrophysics Data System (ADS)

    Samajpati, E.; Hickey-Vargas, R.

    2017-12-01

    The Kyushu-Palau Ridge (KPR) is a remnant of the early Izu-Bonin-Mariana (IBM) island arc, separated by arc rifting and seafloor spreading. We examine and compare volcanic materials from two sites where the transition from IBM arc building to rifting is well sampled: DSDP Site 296 on the northern KPR crest, and recent IODP Site U1438 in the adjacent Amami-Sankaku basin to the west. The purpose of the study is to understand the origin and depositional regime of volcaniclastic sediments during the arc rifting stage. Site 1438 sedimentary Unit II and the upper part of Unit III (300 and 453 mbsf) correlate in time with sedimentary Units 1G and 2 of DSDP Site 296 (160 and 300 mbsf). The upper part of Site U1438 Unit III and Site 296 Unit 2 consist of early to late Oligocene coarse volcaniclastic sedimentary rocks. These are overlain by late Oligocene nannofossil chalks with volcanic sand and ash-rich layers at Site 296 Unit 1G, and tuffaceous silt, sand, siltstone and sandstone at Site 1438 Unit II. The chemical composition of volcanic glass shards, pyroxenes with melt inclusions and amphiboles separated from volcaniclastic sediments were analyzed by EPMA and LA-ICPMS. Glasses are found at Site 296 only, range from medium-K basalt to rhyolite and have trace element patterns typical of arc volcanics. Clinopyroxene and orthopyroxene are found as detrital grains in sediments from both sites. Mg-numbers range from 58 to 94. Interestingly, the alumina content of pyroxene grain populations from both sites increase and then decrease with decreasing Mg-number. This probably reflects control of Al contents in magma and pyroxene by suppressed plagioclase saturation, which apparently was a consistent feature of KPR volcanoes. Melt-inclusions within the pyroxenes are typically small (30-50 microns) and have similar chemical compositions within one grain. The melt inclusions range from basalt to rhyolite with moderate alkali content. Amphibole is more prevalent in late Oligocene

  11. Proposed Class II Permit MI-035-2R-0034: Fact Sheet and Draft Permit

    EPA Pesticide Factsheets

    EPA plans to issue a Class II permit for Muskegon Development Company’s Holcomb 1-22 well in Clare County, Mich. Document page contains factsheet about proposed UIC permit for Holcomb 1-22 well to Muskegon Development Company.

  12. Posterior archaeomagnetic dating for the early Medieval site Thunau am Kamp, Austria

    NASA Astrophysics Data System (ADS)

    Schnepp, Elisabeth; Lanos, Philippe; Obenaus, Martin

    2014-05-01

    The early medieval site Thunau am Kamp consists of a hill fort and a settlement with large burial ground at the bank of river Kamp. All these features are under archaeological investigation since many years. The settlement comprises many pit houses, some with stratigraphic order. Every pit house was equipped with at least one cupola oven and/or a hearth or fireplace. Sometimes the entire cupola was preserved. The site was occupied during the 9th and 10th AD according to potshards which seem to indicate two phases: In the older phase ovens were placed in the corner of the houses while during the younger phase they are found in the middle of the wall. In order to increase the archaeomagnetic data base 14 ovens have been sampled. They fill the temporal gap in the data base for Austria around 900 AD. Laboratory treatment included alternation field and thermal demagnetisations as well as rock magnetic experiments. The baked clay with was formed from a loess sediment has preserved stable directions. Apart from one exception the mean characteristic remanent magnetization directions are concentrated around 900 AD on the early medieval part of the directional archaeomagnetic reference curve of Austria (Schnepp & Lanos, GJI, 2006). Using this curve archaeomagnetic dating with RenDate provides ages between 800 and 1100 AD which are in agreement with archaeological dating. In one case archaeomagnetic dating is even more precise. Together with the archaeological age estimates and stratigraphic information the new data have been included into the database of the Austrian curve. It has been recalculated using a new version of RenCurve. The new data confine the curve and its error band considerably in the time interval 800 to 1100 AD. The curve calibration process also provides a probability density distribution for each structure which allows for posterior dating. This refines temporal errors considerably. Usefulness of such an approach and archaeological implications will be

  13. 75 FR 2140 - Clean Air Act Operating Permit Program; Petition for Objection to Federal Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... Objection to Federal Operating Permit for American Electric Power Service Corporation, Southwest Electric... object to the American Electric Power Service Corporation, Southwest Electric Power Company (AEP... Permits Section, Multimedia Planning and Permitting Division, EPA Region 6, 1445 Ross Avenue, Dallas...

  14. Reducing concentrated animal feeding operations permitting requirements.

    PubMed

    Centner, T J; Newton, G L

    2011-12-01

    Many owners and operators of concentrated animal feeding operations (CAFO) need to secure National Pollutant Discharge Elimination System permits from the federal or state permitting authority. Because of the expense and inconvenience of permit applications, farm groups have challenged revisions to the federal CAFO Rule as well as state regulations claiming selected provisions exceeded the authority of the permitting agency. In 2011, 2 courts responded with decisions that clarify federal and state permitting regulations. Another goal of agricultural groups is to change the regulatory authority of the state from an environmental agency to a department of agriculture. These developments suggest that by altering the permitting authority, CAFO owners and operators may alleviate some of the burdens of the permitting process.

  15. 40 CFR 270.61 - Emergency permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.61 Emergency... an imminent and substantial endangerment to human health or the environment the Director may issue a...

  16. 40 CFR 270.61 - Emergency permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.61 Emergency... an imminent and substantial endangerment to human health or the environment the Director may issue a...

  17. 40 CFR 270.61 - Emergency permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.61 Emergency... an imminent and substantial endangerment to human health or the environment the Director may issue a...

  18. 45 CFR 670.13 - Permit administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Permit administration. 670.13 Section 670.13 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.13 Permit administration. (a) Issuance of the...

  19. 45 CFR 670.13 - Permit administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Permit administration. 670.13 Section 670.13 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.13 Permit administration. (a) Issuance of the...

  20. 45 CFR 670.13 - Permit administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Permit administration. 670.13 Section 670.13 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.13 Permit administration. (a) Issuance of the...

  1. 45 CFR 670.13 - Permit administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Permit administration. 670.13 Section 670.13 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.13 Permit administration. (a) Issuance of the...

  2. 45 CFR 670.13 - Permit administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Permit administration. 670.13 Section 670.13 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.13 Permit administration. (a) Issuance of the...

  3. 40 CFR 270.43 - Termination of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Termination of permits. 270.43 Section 270.43 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.43...

  4. 40 CFR 270.43 - Termination of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Termination of permits. 270.43 Section 270.43 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.43...

  5. Divergent mtDNA lineages of goats in an Early Neolithic site, far from the initial domestication areas

    PubMed Central

    Fernández, Helena; Hughes, Sandrine; Vigne, Jean-Denis; Helmer, Daniel; Hodgins, Greg; Miquel, Christian; Hänni, Catherine; Luikart, Gordon; Taberlet, Pierre

    2006-01-01

    Goats were among the first farm animals domesticated, ≈10,500 years ago, contributing to the rise of the “Neolithic revolution.” Previous genetic studies have revealed that contemporary domestic goats (Capra hircus) show far weaker intercontinental population structuring than other livestock species, suggesting that goats have been transported more extensively. However, the timing of these extensive movements in goats remains unknown. To address this question, we analyzed mtDNA sequences from 19 ancient goat bones (7,300–6,900 years old) from one of the earliest Neolithic sites in southwestern Europe. Phylogenetic analysis revealed that two highly divergent goat lineages coexisted in each of the two Early Neolithic layers of this site. This finding indicates that high mtDNA diversity was already present >7,000 years ago in European goats, far from their areas of initial domestication in the Near East. These results argue for substantial gene flow among goat populations dating back to the early neolithisation of Europe and for a dual domestication scenario in the Near East, with two independent but essentially contemporary origins (of both A and C domestic lineages) and several more remote and/or later origins. PMID:17030824

  6. Palaeotectonic implications of increased late Eocene-early Oligocene volcanism from South Pacific DSDP sites

    USGS Publications Warehouse

    Kennett, J.P.; Von Der Borch, C.; Baker, P.A.; Barton, C.E.; Boersma, A.; Cauler, J.P.; Dudley, W.C.; Gardner, J.V.; Jenkins, D.G.; Lohman, W.H.; Martini, E.; Merrill, R.B.; Morin, R.; Nelson, Campbell S.; Robert, C.; Srinivasan, M.S.; Stein, R.; Takeuchi, A.; Murphy, M.G.

    1985-01-01

    Late Eocene-early Oligocene (42-35 Myr) sediments cored at two DSDP sites in the south-west Pacific contain evidence of a pronounced increase in local volcanic activity, particularly in close association with the Eocene-Oligocene boundary. This pulse of volcanism is coeval with that in New Zealand and resulted from the development of an Indo- Australian / Pacific Plate boundary through the region during the late Eocene. The late Eocene / earliest Oligocene was marked by widespread volcanism and tectonism throughout the Pacific and elsewhere, and by one of the most important episodes of Cenozoic climatic cooling. ?? 1985 Nature Publishing Group.

  7. Towards optical fibre based Raman spectroscopy for the detection of surgical site infection

    NASA Astrophysics Data System (ADS)

    Thompson, Alex J.; Koziej, Lukasz; Williams, Huw D.; Elson, Daniel S.; Yang, Guang-Zhong

    2016-03-01

    Surgical site infections (SSIs) are common post-surgical complications that remain significant clinical problems, as they are associated with substantial mortality and morbidity. As such, there is significant interest in the development of minimally invasive techniques that permit early detection of SSIs. To this end, we are applying a compact, clinically deployable Raman spectrometer coupled to an optical fibre probe to the study of bacteria, with the long term goal of using Raman spectroscopy to detect infection in vivo. Our system comprises a 785 nm laser diode for excitation and a commercial (Ocean Optics, Inc.) Raman spectrometer for detection. Here we discuss the design, optimisation and validation of this system, and describe our first experiences interrogating bacterial cells (Escherichia coli) in vitro.

  8. 10 CFR 2.621 - Acceptance and docketing of application for early review of site suitability issues in a combined...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under... Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as...

  9. 40 CFR 270.60 - Permits by rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.60 Permits by... operator of a barge or other vessel which accepts hazardous waste for ocean disposal, if the owner or...

  10. 40 CFR 270.60 - Permits by rule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.60 Permits by... operator of a barge or other vessel which accepts hazardous waste for ocean disposal, if the owner or...

  11. 45 CFR 670.14 - Conditions of permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Conditions of permits. 670.14 Section 670.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.14 Conditions of permits. (a) Possession of permits...

  12. 45 CFR 670.14 - Conditions of permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Conditions of permits. 670.14 Section 670.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.14 Conditions of permits. (a) Possession of permits...

  13. 45 CFR 670.14 - Conditions of permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Conditions of permits. 670.14 Section 670.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.14 Conditions of permits. (a) Possession of permits...

  14. 45 CFR 670.14 - Conditions of permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Conditions of permits. 670.14 Section 670.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.14 Conditions of permits. (a) Possession of permits...

  15. 45 CFR 670.14 - Conditions of permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Conditions of permits. 670.14 Section 670.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.14 Conditions of permits. (a) Possession of permits...

  16. 30 CFR 815.2 - Permitting information.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Permitting information. 815.2 Section 815.2... Permitting information. Notwithstanding cross-references in other parts which may be otherwise construed, part 772 establishes the notice and permit information requirements for coal exploration. [53 FR 52950...

  17. 30 CFR 815.2 - Permitting information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Permitting information. 815.2 Section 815.2... Permitting information. Notwithstanding cross-references in other parts which may be otherwise construed, part 772 establishes the notice and permit information requirements for coal exploration. [53 FR 52950...

  18. 21 CFR 1210.24 - Temporary permits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.24 Temporary permits. A temporary permit will be granted... inspections required by the applicable provisions of section 2 of the Federal Import Milk Act. Temporary...

  19. 21 CFR 1210.24 - Temporary permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.24 Temporary permits. A temporary permit will be granted... inspections required by the applicable provisions of section 2 of the Federal Import Milk Act. Temporary...

  20. 50 CFR 635.4 - Permits and fees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and to fish for, take, retain or possess Atlantic tunas, swordfish, or sharks when engaged in... harvesting vessel must present for inspection the vessel's HMS Charter/Headboat permit; Atlantic tunas, shark... the shark research permit to the first receiver. The permit(s) must be presented prior to completing...

  1. 50 CFR 635.4 - Permits and fees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... and to fish for, take, retain or possess Atlantic tunas, swordfish, or sharks when engaged in... harvesting vessel must present for inspection the vessel's HMS Charter/Headboat permit; Atlantic tunas, shark... the shark research permit to the first receiver. The permit(s) must be presented prior to completing...

  2. 50 CFR 222.304 - Renewal of permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 9 2011-10-01 2011-10-01 false Renewal of permits. 222.304 Section 222.304 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC... Permit Procedures § 222.304 Renewal of permits. When the permit is renewable and a permittee intends to...

  3. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC... issue a foreign air carrier permit, other than a Freely Associated State Foreign Air Carrier Permit, to...

  4. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC... issue a foreign air carrier permit, other than a Freely Associated State Foreign Air Carrier Permit, to...

  5. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC... issue a foreign air carrier permit, other than a Freely Associated State Foreign Air Carrier Permit, to...

  6. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC... issue a foreign air carrier permit, other than a Freely Associated State Foreign Air Carrier Permit, to...

  7. 9 CFR 104.3 - Permit application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... VIRUSES, SERUMS, TOXINS, AND ANALOGOUS PRODUCTS; ORGANISMS AND VECTORS PERMITS FOR BIOLOGICAL PRODUCTS § 104.3 Permit application. (a) Each person desiring to import a biological product shall make written... permit to import a veterinary biologic for research and evaluation or transit shipment may be made on the...

  8. 30 CFR 777.17 - Permit fees.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Permit fees. 777.17 Section 777.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL... CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.17 Permit fees. An application for a surface coal...

  9. 30 CFR 777.17 - Permit fees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Permit fees. 777.17 Section 777.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL... CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.17 Permit fees. An application for a surface coal...

  10. 40 CFR 147.2927 - Permit modification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standards on which the permit was based have changed. (4) The Regional Administrator has received notice of a proposed permit transfer. (5) An interested person requests in writing that a permit be modified... appropriate. (b) Minor modifications. (1) Minor modifications do not require that the procedures listed in...

  11. 40 CFR 172.5 - The permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator determines are warranted. (b) Duration. Permits will be effective for a specified period of time... submitted. The applicant should propose a suitable duration of the permit commensurate with the program... circumstances warrant. (c) Limitations. The quantity of a pesticide allowed by a permit may be less than...

  12. 40 CFR 68.215 - Permit content and air permitting authority or designated agency requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content and air permitting authority or designated agency requirements. 68.215 Section 68.215 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Other...

  13. Avoiding Title V permitting pitfalls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laswell, D.L.

    1993-04-01

    Title V of the 1990 Clean Air Act Amendments requires states to implement new air operating permit programs. States have a great deal of flexibility in developing their permit programs. Industry should work now to ensure that state programs contain the favorable aspects of the federal regulations and do not contain more stringent requirements that are not required under the Clean Air Act. This article outlines areas of the permit program that have the potential to handicap industry`s ability to expand.

  14. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this...

  15. 32 CFR 855.9 - Permit renewal.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Permit renewal. 855.9 Section 855.9 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE AIRCRAFT CIVIL AIRCRAFT USE OF UNITED STATES AIR FORCE AIRFIELDS Civil Aircraft Landing Permits § 855.9 Permit renewal. When a landing...

  16. 32 CFR 855.9 - Permit renewal.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Permit renewal. 855.9 Section 855.9 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE AIRCRAFT CIVIL AIRCRAFT USE OF UNITED STATES AIR FORCE AIRFIELDS Civil Aircraft Landing Permits § 855.9 Permit renewal. When a landing...

  17. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  18. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  19. Primary site and regional lymph node involvement are independent prognostic factors for early-stage extranodal nasal-type natural killer/T cell lymphoma.

    PubMed

    Niu, Shao-Qing; Yang, Yong; Li, Yi-Yang; Wen, Ge; Wang, Liang; Li, Zhi-Ming; Wang, Han-Yu; Zhang, Lu-Lu; Xia, Yun-Fei; Zhang, Yu-Jing

    2016-04-04

    Nasal-type extranodal natural killer/T-cell lymphoma (ENKTCL) originates primarily in the nasal cavity or extra-nasal sites within the upper aerodigestive tract. However, it is unclear whether the primary site can serve as an independent prognostic factor or whether the varying clinical outcomes observed with different primary sites can be attributed merely to their propensities of regional lymph node involvement. The aim of this study was to investigate the prognostic implications of the primary site and regional lymph node involvement in patients with early-stage nasal-type ENKTCL. To develop a nomogram, we reviewed the clinical data of 215 consecutively diagnosed patients with early-stage nasal-type ENKTCL who were treated in Sun Yat-sen University Cancer Center with chemotherapy and radiotherapy between 2000 and 2011. The predictive accuracy and discriminative ability of the nomogram were determined using a concordance index (C-index) and calibration curve. The 5-year overall survival (OS) and progression-free survival (PFS) rates of patients with nasal ENKTCL were higher than those of patients with extra-nasal ENKTCL (OS: 68.2% vs. 46.0%, P = 0.030; PFS: 53.4% vs. 26.6%, P = 0.010). The 5-year OS and PFS rates of patients with Ann Arbor stage IE ENKTCL were higher than those of patients with Ann Arbor stage IIE ENKTCL (OS: 66.3% vs. 59.2%, P = 0.003; PFS: 51.4% vs. 40.3%, P = 0.009). Multivariate analysis showed that age >60 years, ECOG performance status score ≥2, elevated lactate dehydrogenase (LDH) level, extra-nasal primary site, and regional lymph node involvement were significantly associated with lower 5-year OS rate; age >60 years, elevated LDH level, extra-nasal primary site, and regional lymph node involvement were significantly associated with lower 5-year PFS rate. The nomogram included the primary site and regional lymph node involvement based on multivariate analysis. The calibration curve showed good agreement between the predicted and actual

  20. A new species of Gulo from the Early Pliocene Gray Fossil Site (Eastern United States); rethinking the evolution of wolverines

    PubMed Central

    Bredehoeft, Keila E.; Wallace, Steven C.

    2018-01-01

    The wolverine (Gulo gulo) is the largest living terrestrial member of the Mustelidae; a versatile predator formerly distributed throughout boreal regions of North America and Eurasia. Though commonly recovered from Pleistocene sites across their range, pre-Pleistocene records of the genus are exceedingly rare. Here, we describe a new species of Gulo from the Gray Fossil Site in Tennessee. Based on biostratigraphy, a revised estimate of the age of the Gray Fossil Site is Early Pliocene, near the Hemphillian—Blancan transition, between 4.9 and 4.5 Ma. This represents the earliest known occurrence of a wolverine, more than one million years earlier than any other record. The new species of wolverine described here shares similarities with previously described species of Gulo, and with early fishers (Pekania). As the earliest records of both Gulo and Pekania are known from North America, this suggests the genus may have evolved in North America and dispersed to Eurasia later in the Pliocene. Both fauna and flora at the Gray Fossil Site are characteristic of warm/humid climates, which suggests wolverines may have become ‘cold-adapted’ relatively recently. Finally, detailed comparison indicates Plesiogulo, which has often been suggested to be ancestral to Gulo, is not likely closely related to gulonines, and instead may represent convergence on a similar niche. PMID:29682423

  1. 40 CFR 71.5 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... existing operating permit issued by a State under the State's approved part 70 program and is applying for... date at least 6 months in advance of the date. Where an existing part 70 or 71 permit would prohibit such construction or change in operation, the source must obtain a permit revision before commencing...

  2. 36 CFR 9.3 - Access permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Access permits. 9.3 Section 9.3 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.3 Access permits. (a) All special use or other permits dealing with...

  3. 36 CFR 9.3 - Access permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Access permits. 9.3 Section 9.3 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.3 Access permits. (a) All special use or other permits dealing with...

  4. 36 CFR 9.3 - Access permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Access permits. 9.3 Section 9.3 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.3 Access permits. (a) All special use or other permits dealing with...

  5. 36 CFR 9.3 - Access permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Access permits. 9.3 Section 9.3 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.3 Access permits. (a) All special use or other permits dealing with...

  6. 36 CFR 9.3 - Access permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Access permits. 9.3 Section 9.3 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.3 Access permits. (a) All special use or other permits dealing with...

  7. Lean in Air Permitting Guide

    EPA Pesticide Factsheets

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  8. 77 FR 16836 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... operating permit (Permit Number P062R2) issued by the New Mexico Environment Department, Air Quality Bureau... Objection to State Operating Permit for Public Service Company of New Mexico, San Juan Generating Station... Mexico, for the operations of the San Juan Generating Station (SJGS) located in San Juan County, New...

  9. 15 CFR 904.321 - Reinstatement of permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS CIVIL PROCEDURES Permit Sanctions and Denials Permit Sanction for Violations § 904.321 Reinstatement of permit. (a...

  10. 15 CFR 904.321 - Reinstatement of permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS CIVIL PROCEDURES Permit Sanctions and Denials Permit Sanction for Violations § 904.321 Reinstatement of permit. (a...

  11. 9 CFR 98.13 - Import permit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos From Regions Where Rinderpest or Foot-and-Mouth Disease Exists § 98.13 Import permit. (a) Ruminant and swine embryos and all test samples required by this... for a permit to import embryos will also serve as the application for a permit to import test samples...

  12. 9 CFR 98.13 - Import permit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos From Regions Where Rinderpest or Foot-and-Mouth Disease Exists § 98.13 Import permit. (a) Ruminant and swine embryos and all test samples required by this... for a permit to import embryos will also serve as the application for a permit to import test samples...

  13. 9 CFR 98.13 - Import permit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos From Regions Where Rinderpest or Foot-and-Mouth Disease Exists § 98.13 Import permit. (a) Ruminant and swine embryos and all test samples required by this... for a permit to import embryos will also serve as the application for a permit to import test samples...

  14. 14 CFR 211.34 - Other permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Other permits. 211.34 Section 211.34 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS APPLICATIONS FOR PERMITS TO FOREIGN AIR CARRIERS Freely Associated State Air Carriers § 211.34 Other permits. Nothing in this section...

  15. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this part shall be conditioned upon compliance...

  16. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this part shall be conditioned upon compliance...

  17. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this part shall be conditioned upon compliance...

  18. 45 CFR 671.9 - Conditions of permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Conditions of permit. 671.9 Section 671.9 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.9 Conditions of permit. (a) Conditions. All permits issued pursuant to subpart C of this part shall be conditioned upon compliance...

  19. Massport Logan International Airport NPDES Permit | NPDES ...

    EPA Pesticide Factsheets

    2017-08-28

    Massport was issued a permit for discharging storm water to Boston Harbor on March 1, 1978. The permit expired five years later. However, EPA administratively continued the permit as allowed by regulations. EPA issued a draft permit and fact sheet (which provides EPA's technical basis for establishing effluent limits and monitoring) for public comment on July 25, 2006.

  20. 25 CFR 700.711 - Grazing permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES New Lands... residency on the New Lands Range Unit of permit issue, and (4) Own livestock which graze on the range unit of permit issue. (c) Permits will be issued for a base of 80 SUYL (20 AU) and may not be divided or...

  1. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  2. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  3. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  4. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  5. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  6. 40 CFR 124.6 - Draft permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 270.32 (RCRA) (except for PSD permits))); (2) All compliance schedules under §§ 122.47 (NPDES), 144.53 (UIC), 233.10 (404), or 270.33 (RCRA) (except for PSD permits); (3) All monitoring requirements under §§ 122.48 (NPDES), 144.54 (UIC), 233.11 (404), or 270.31 (RCRA) (except for PSD permits); and (4) For: (i...

  7. 40 CFR 124.6 - Draft permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 270.32 (RCRA) (except for PSD permits))); (2) All compliance schedules under §§ 122.47 (NPDES), 144.53 (UIC), 233.10 (404), or 270.33 (RCRA) (except for PSD permits); (3) All monitoring requirements under §§ 122.48 (NPDES), 144.54 (UIC), 233.11 (404), or 270.31 (RCRA) (except for PSD permits); and (4) For: (i...

  8. 40 CFR 124.6 - Draft permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 270.32 (RCRA) (except for PSD permits))); (2) All compliance schedules under §§ 122.47 (NPDES), 144.53 (UIC), 233.10 (404), or 270.33 (RCRA) (except for PSD permits); (3) All monitoring requirements under §§ 122.48 (NPDES), 144.54 (UIC), 233.11 (404), or 270.31 (RCRA) (except for PSD permits); and (4) For: (i...

  9. 40 CFR 124.6 - Draft permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 270.32 (RCRA) (except for PSD permits))); (2) All compliance schedules under §§ 122.47 (NPDES), 144.53 (UIC), 233.10 (404), or 270.33 (RCRA) (except for PSD permits); (3) All monitoring requirements under §§ 122.48 (NPDES), 144.54 (UIC), 233.11 (404), or 270.31 (RCRA) (except for PSD permits); and (4) For: (i...

  10. 40 CFR 124.6 - Draft permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 270.32 (RCRA) (except for PSD permits))); (2) All compliance schedules under §§ 122.47 (NPDES), 144.53 (UIC), 233.10 (404), or 270.33 (RCRA) (except for PSD permits); (3) All monitoring requirements under §§ 122.48 (NPDES), 144.54 (UIC), 233.11 (404), or 270.31 (RCRA) (except for PSD permits); and (4) For: (i...

  11. 43 CFR 5511.2-3 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (a) Application for permit. Before timber is cut for free use, an application for permit in duplicate... performance of the provisions of the permit and the regulations in §§ 5511.2-1 to 5511.2-6. (c) Cutting rules and restrictions. All free-use timber shall be cut and removed in accordance with approved forestry...

  12. Operating Permit Program Approval Issues

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. Operating Permits Program Review Process

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. 25 CFR 167.11 - Tenure of grazing permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Tenure of grazing permits. (a) All active regular grazing permits shall be for one year and shall be... § 167.8 may become a livestock operator by obtaining an active grazing permit through negotiability or... handle each matter of unused grazing permit or portions of grazing permits on individual merits. Where...

  15. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  16. 40 CFR 60.4124 - Hg budget permit revisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  17. 43 CFR 11.24 - Preassessment screen-information on the site.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to grant the permit or license authorizes such commitment of natural resources, and that the facility... site. 11.24 Section 11.24 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE ASSESSMENTS Preassessment Phase § 11.24 Preassessment screen—information on the site. (a...

  18. 43 CFR 11.24 - Preassessment screen-information on the site.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to grant the permit or license authorizes such commitment of natural resources, and that the facility... site. 11.24 Section 11.24 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE ASSESSMENTS Preassessment Phase § 11.24 Preassessment screen—information on the site. (a...

  19. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  20. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  1. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  2. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  3. 30 CFR 773.10 - Review of permit history.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  4. 40 CFR 97.23 - NOX Budget permit contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget permit contents. 97.23... (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.23 NOX Budget permit contents. (a) Each NOX Budget permit will contain, in a format prescribed by the permitting...

  5. 78 FR 48201 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... establishment of a permit system for various activities in Antarctica and designation of certain animals and... mammals at breeding, molting, and terrestrial, fast-ice, and sea-ice haul-out sites at various sub...

  6. 50 CFR 665.13 - Permits and fees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... service incurred in processing the permit. The fee may not exceed such costs and is specified with each.... (ii) Mau Zone limited access permit. (iii) Coral reef ecosystem special permit. (iv) American Samoa...

  7. 50 CFR 665.13 - Permits and fees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... service incurred in processing the permit. The fee may not exceed such costs and is specified with each.... (ii) Mau Zone limited access permit. (iii) Coral reef ecosystem special permit. (iv) American Samoa...

  8. 50 CFR 665.13 - Permits and fees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... service incurred in processing the permit. The fee may not exceed such costs and is specified with each.... (ii) Mau Zone limited access permit. (iii) Coral reef ecosystem special permit. (iv) American Samoa...

  9. 40 CFR 74.12 - Opt-in permit contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Opt-in permit contents. 74.12 Section 74.12 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE OPT-INS Permitting Procedures § 74.12 Opt-in permit contents. (a) The opt-in permit shall be included in the Acid Rain permit. (b)...

  10. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  11. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  12. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  13. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  14. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  15. Water Quality Trading Toolkit for Permit Writers

    EPA Pesticide Factsheets

    The Water Quality Trading Toolkit for Permit Writers is EPA’s first “how-to” manual on designing and implementing water quality trading programs. It helps NPDES permitting authorities incorporate trading provisions into permits.

  16. 2016 Pesticide General Permit - Pre-publication Version

    EPA Pesticide Factsheets

    EPA has posted a pre-publication version of the 2016 Pesticide General Permit (PGP) to help the regulated community become familiar with the permit requirements before the permit becomes effective on October 31, 2016.

  17. 40 CFR 270.275 - What information must I submit to the permitting agency to support my standardized permit...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal laws required in § 270.3. (e) Solid waste management unit information required by § 270.14(d). (f... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM RCRA Standardized Permits for Storage and Treatment Units...

  18. 76 FR 12730 - Clean Air Act Operating Permit Program; Objection to State Operating Permit for U.S. Steel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... ENVIRONMENTAL PROTECTION AGENCY [Regional Docket Nos. V-2009-1, FRL-9276-7] Clean Air Act Operating Permit Program; Objection to State Operating Permit for U.S. Steel-Granite City Works AGENCY... operating permit issued by the Illinois Environmental Protection Agency to the U.S. Steel--Granite City...

  19. 23 CFR 750.106 - Class 3 and 4 signs within informational sites.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... area, and nothing on such sign may be permitted to be legible from any place on the main-traveled way or a turning roadway. (4) Not more than one sign concerning a single activity or place may be permitted within any one informational site. (5) Signs concerning a single activity or place may be...

  20. 23 CFR 750.106 - Class 3 and 4 signs within informational sites.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... area, and nothing on such sign may be permitted to be legible from any place on the main-traveled way or a turning roadway. (4) Not more than one sign concerning a single activity or place may be permitted within any one informational site. (5) Signs concerning a single activity or place may be...

  1. Permitted water use in Iowa, 1985

    USGS Publications Warehouse

    Runkle, D.L.; Newman, J.L.; Shields, E.M.

    1985-01-01

    This report summarizes where, how much and for what purpose water is allocated for use in Iowa with permits issued by the Department of Water, Air and Waste Management. In Iowa, from a total permitted water use of 855,175.45 million gallons per year, about 58 percent is from surface-water sources and about 42 percent is from ground-water sources. Streams are 80.5 percent of the total surface-water use and wells make up 80.1 percent of the total ground-water use, with 65.4 percent of ground water coming from surficial aquifers. Power generation is the use category that is permitted the largest amount of total water use, 46.6 percent, with surface water being the source of 96.7 percent and 77.9 percent of the surface water is from streams. The public water suppliers' category is the next largest use type with 15.7 percent of the total permitted water. Ground water constitutes 74.4 percent of the public water supplier category with 51.7 percent from surficial aquifers. Surface water makes up 25.6 percent of this category with 83.0 percent of the surface water withdrawn from streams. Mining comprises 13.4 percent of the total water use and is the third largest water-use category. Ground water is the source of 63.3 percent of permitted mining water use with 94.3 percent of this from quarries and sand and gravel pits. Surface water is the source of 36.7 percent of the permitted mining water use with 97.6 percent from streams. Irrigation is the fourth largest permitted use type using 12.0 percent of the total water use. Eighty-eight percent of irrigation is from ground-water sources where surficial aquifers account for 94.7 percent. Streams are 81.1 percent of irrigational surface-water use. Self-supplied industrial users are permitted 10.6 percent of the total permitted water use with 85.5 percent of this from ground-water sources and 14.5 percent from surface-water sources. Of the self-supplied industrial ground-water use, 47.9 percent comes from surficial aquifers and

  2. 43 CFR 9212.3 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Permits. 9212.3 Section 9212.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) FIRE MANAGEMENT Wildfire Prevention § 9212.3 Permits. (a...

  3. 43 CFR 9212.3 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Permits. 9212.3 Section 9212.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) FIRE MANAGEMENT Wildfire Prevention § 9212.3 Permits. (a...

  4. 43 CFR 9212.3 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Permits. 9212.3 Section 9212.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) FIRE MANAGEMENT Wildfire Prevention § 9212.3 Permits. (a...

  5. 43 CFR 9212.3 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Permits. 9212.3 Section 9212.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) FIRE MANAGEMENT Wildfire Prevention § 9212.3 Permits. (a...

  6. 50 CFR 679.4 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... section (ii) CDQ Halibut (A) Halibut permit Specified fishing year Paragraph (e) of this section (B) Halibut hired master permit Specified fishing year Paragraph (e) of this section (iii) AFA: (A) Catcher... (l) of this section (E) Inshore cooperative Calendar year Paragraph (l) of this section (F...

  7. 2012 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mike Lewis

    2013-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.

  8. 25 CFR 166.702 - Can a permit provide for negotiated remedies in the event of a permit violation?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... INTERIOR LAND AND WATER GRAZING PERMITS Permit Violations § 166.702 Can a permit provide for negotiated... exercise any negotiated remedies on behalf of the Indian landowners, the exercise of such remedies may... proceedings, as appropriate, in deciding whether to exercise any of the remedies available to us under § 166...

  9. 25 CFR 166.702 - Can a permit provide for negotiated remedies in the event of a permit violation?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INTERIOR LAND AND WATER GRAZING PERMITS Permit Violations § 166.702 Can a permit provide for negotiated... exercise any negotiated remedies on behalf of the Indian landowners, the exercise of such remedies may... proceedings, as appropriate, in deciding whether to exercise any of the remedies available to us under § 166...

  10. 25 CFR 166.702 - Can a permit provide for negotiated remedies in the event of a permit violation?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... INTERIOR LAND AND WATER GRAZING PERMITS Permit Violations § 166.702 Can a permit provide for negotiated... exercise any negotiated remedies on behalf of the Indian landowners, the exercise of such remedies may... proceedings, as appropriate, in deciding whether to exercise any of the remedies available to us under § 166...

  11. 25 CFR 166.702 - Can a permit provide for negotiated remedies in the event of a permit violation?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... INTERIOR LAND AND WATER GRAZING PERMITS Permit Violations § 166.702 Can a permit provide for negotiated... exercise any negotiated remedies on behalf of the Indian landowners, the exercise of such remedies may... proceedings, as appropriate, in deciding whether to exercise any of the remedies available to us under § 166...

  12. 25 CFR 166.702 - Can a permit provide for negotiated remedies in the event of a permit violation?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... INTERIOR LAND AND WATER GRAZING PERMITS Permit Violations § 166.702 Can a permit provide for negotiated... exercise any negotiated remedies on behalf of the Indian landowners, the exercise of such remedies may... proceedings, as appropriate, in deciding whether to exercise any of the remedies available to us under § 166...

  13. Early decision framework for integrating sustainable risk management for complex remediation sites: Drivers, barriers, and performance metrics.

    PubMed

    Harclerode, Melissa A; Macbeth, Tamzen W; Miller, Michael E; Gurr, Christopher J; Myers, Teri S

    2016-12-15

    As the environmental remediation industry matures, remaining sites often have significant underlying technical challenges and financial constraints. More often than not, significant remediation efforts at these "complex" sites have not achieved stringent, promulgated cleanup goals. Decisions then have to be made about whether and how to commit additional resources towards achieving those goals, which are often not achievable nor required to protect receptors. Guidance on cleanup approaches focused on evaluating and managing site-specific conditions and risks, rather than uniformly meeting contaminant cleanup criteria in all media, is available to aid in this decision. Although these risk-based cleanup approaches, such as alternative endpoints and adaptive management strategies, have been developed, they are under-utilized due to environmental, socio-economic, and risk perception barriers. Also, these approaches are usually implemented late in the project life cycle after unsuccessful remedial attempts to achieve stringent cleanup criteria. In this article, we address these barriers by developing an early decision framework to identify if site characteristics support sustainable risk management, and develop performance metrics and tools to evaluate and implement successful risk-based cleanup approaches. In addition, we address uncertainty and risk perception challenges by aligning risk-based cleanup approaches with the concepts of risk management and sustainable remediation. This approach was developed in the context of lessons learned from implementing remediation at complex sites, but as a framework can, and should, be applied to all sites undergoing remediation. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. Emission limitations and related provisions which are established in Minnesota permits as federally...

  15. 30 CFR 740.13 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Permits. 740.13 Section 740.13 Mineral... regulations. (3) Surface coal mining operations authorized under the initial regulatory program or 43 CFR... package shall be filed with the regulatory authority. (3) Each permit application package shall include...

  16. Air Permitting Delegations in EPA's New England Region

    EPA Pesticide Factsheets

    All Region 1 states have EPA-approved Title V operating permit programs. In addition, all Region 1 states have either SIP-approved NSR/PSD permitting programs or the state has been delegated as the permitting authority for NSR/PSD permits by EPA.

  17. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...

  18. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...

  19. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...

  20. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...

  1. 39. Photo copy of site plan, (original in Forest Service ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photo copy of site plan, (original in Forest Service Office, Elkins, WV, 'Parsons Nursery Special Use Permit, West Virginia Department of Natural Resources'), 1969. PARSONS NURSERY SITE PLAN. CORROLATES TO PARSONS NURSERY AT TIME OF FLOOD, NOVEMBER, 1985. - Parsons Nursery, South side of U.S. Route 219, Parsons, Tucker County, WV

  2. 75 FR 4581 - Endangered [and Threatened] Wildlife and Plants; Permit(s); Land Clearing Associated With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ...] Endangered [and Threatened] Wildlife and Plants; Permit(s); Land Clearing Associated With Phosphate Mining in... (Aphelocoma coerulescens)--occupied habitat incidental to land clearing and phosphate mining in Manatee County... with phosphate mining which will result in the take of 100 ac of occupied scrub-jay habitat, including...

  3. 75 FR 38831 - Endangered [and Threatened] Wildlife and Plants; Permit(s); Land Clearing Associated With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ...] Endangered [and Threatened] Wildlife and Plants; Permit(s); Land Clearing Associated With Phosphate Mining in... (Aphelocoma coerulescens)-occupied habitat incidental to land clearing and phosphate mining in Manatee County... with phosphate mining which will result in the take of 75 ac of occupied scrub-jay habitat, including...

  4. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    PubMed

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  5. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81more » Water Services waste water.« less

  6. 50 CFR 622.470 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Corals and Reef...) Prohibited coral. A Federal permit may be issued to take or possess Caribbean prohibited coral only as.... (1) The applicant for a coral permit must be the individual who will be conducting the activity that...

  7. 50 CFR 622.470 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Corals and Reef...) Prohibited coral. A Federal permit may be issued to take or possess Caribbean prohibited coral only as.... (1) The applicant for a coral permit must be the individual who will be conducting the activity that...

  8. Does the presence of a Caesarean section scar affect implantation site and early pregnancy outcome in women attending an early pregnancy assessment unit?

    PubMed

    Naji, O; Wynants, L; Smith, A; Abdallah, Y; Saso, S; Stalder, C; Van Huffel, S; Ghaem-Maghami, S; Van Calster, B; Timmerman, D; Bourne, T

    2013-06-01

    Are there any differences in the location and distance to the internal cervical ostium of the implantation site of the intrauterine gestation sacs, early pregnancy symptoms and pregnancy outcome at 12 weeks gestation between women with and without a previous Caesarean section (CS)? The presence of a CS scar affects the site of implantation, and the distance between implantation site and the scar is related to the risk of spontaneous abortion. WHAT IS KNOWN ALREADY?: Little is known about the impact of a CS scar on implantation other than the risk of Caesarean scar pregnancy (CSP). Furthermore, there is a paucity of information on how the proximity of implantation to the scar impacts on pregnancy outcome in the first trimester. A prospective cohort study conducted over 15 months in the early pregnancy unit of a London Teaching Hospital. Three hundred and eighty women underwent a transvaginal scan at 6-11 weeks of gestation. A total of 170 women had undergone ≥1 CS, and 210 women had no history of CS. The 380 women were recruited as consecutive non-selected cases. The relationship between the implanted sac and the CS scar was assessed by quantifiable measures and by subjective impression. Logistic regression analysis was used to determine the influence of the presence of a CS scar on pregnancy outcome. The final outcome of the study was the viability of the pregnancy at 12 weeks. Implantation was most frequently posterior (53%) in the CS group and fundal in the non-CS group (42%). Gestation sac implantation was 8.7 mm lower in the CS group (95% confidence interval (CI) 6.7-10.7, P < 0.0001). Presenting complaints differed in women with and without a previous CS (P = 0.0009). More frequent vaginal bleeding [73 versus 55%, difference -18, 95% CI (-27 to -8%] yet no clearly increased spontaneous abortion rates were noted in the CS group compared with the non-CS group (adjusted odds ratio = 1.1, 95% CI 0.6-1.9, P = 0.74). Subjective impression showed that in eight

  9. 50 CFR 15.24 - Permits for cooperative breeding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.24 Permits for cooperative breeding. (a) Application requirements for permits for cooperative breeding. Each... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permits for cooperative breeding. 15.24...

  10. 50 CFR 15.24 - Permits for cooperative breeding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.24 Permits for cooperative breeding. (a) Application requirements for permits for cooperative breeding. Each... 50 Wildlife and Fisheries 1 2011-10-01 2011-10-01 false Permits for cooperative breeding. 15.24...

  11. 50 CFR 15.24 - Permits for cooperative breeding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.24 Permits for cooperative breeding. (a) Application requirements for permits for cooperative breeding. Each... 50 Wildlife and Fisheries 1 2012-10-01 2012-10-01 false Permits for cooperative breeding. 15.24...

  12. 32 CFR 767.5 - Evaluation of permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 5 2011-07-01 2011-07-01 false Evaluation of permit application. 767.5 Section 767.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES... OF THE DEPARTMENT OF THE NAVY Permit Guidelines § 767.5 Evaluation of permit application. (a) Permit...

  13. 32 CFR 767.5 - Evaluation of permit application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 5 2013-07-01 2013-07-01 false Evaluation of permit application. 767.5 Section 767.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES... OF THE DEPARTMENT OF THE NAVY Permit Guidelines § 767.5 Evaluation of permit application. (a) Permit...

  14. 32 CFR 767.5 - Evaluation of permit application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 5 2012-07-01 2012-07-01 false Evaluation of permit application. 767.5 Section 767.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES... OF THE DEPARTMENT OF THE NAVY Permit Guidelines § 767.5 Evaluation of permit application. (a) Permit...

  15. 32 CFR 767.5 - Evaluation of permit application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 5 2014-07-01 2014-07-01 false Evaluation of permit application. 767.5 Section 767.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES... OF THE DEPARTMENT OF THE NAVY Permit Guidelines § 767.5 Evaluation of permit application. (a) Permit...

  16. 32 CFR 767.5 - Evaluation of permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Evaluation of permit application. 767.5 Section 767.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES... OF THE DEPARTMENT OF THE NAVY Permit Guidelines § 767.5 Evaluation of permit application. (a) Permit...

  17. 15 CFR 904.310 - Nature of permit sanctions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Nature of permit sanctions. 904.310 Section 904.310 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanctions for Noncompliance § 904.310 Nature of permit...

  18. 15 CFR 904.310 - Nature of permit sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Nature of permit sanctions. 904.310 Section 904.310 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanctions for Noncompliance § 904.310 Nature of permit...

  19. 15 CFR 904.310 - Nature of permit sanctions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Nature of permit sanctions. 904.310 Section 904.310 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanctions for Noncompliance § 904.310 Nature of permit...

  20. 15 CFR 904.310 - Nature of permit sanctions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Nature of permit sanctions. 904.310 Section 904.310 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanctions for Noncompliance § 904.310 Nature of permit...

  1. 27 CFR 19.910 - Application for permit required.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Permits § 19.910 Application for permit required. Any person wishing to establish an alcohol fuel plant shall first make application for and obtain an alcohol fuel producer's permit. The application for a... required by 27 CFR 196.45. Alcohol fuel producers' permits are continuing unless automatically terminated...

  2. 15 CFR 904.310 - Nature of permit sanctions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Nature of permit sanctions. 904.310 Section 904.310 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanctions for Noncompliance § 904.310 Nature of permit...

  3. 27 CFR 19.920 - Automatic termination of permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Automatic termination of permits. 19.920 Section 19.920 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE... Changes Affecting Applications and Permits § 19.920 Automatic termination of permits. (a) Permits not...

  4. 50 CFR 13.26 - Discontinuance of permit activity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Discontinuance of permit activity. 13.26 Section 13.26 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR... PLANTS GENERAL PERMIT PROCEDURES Permit Administration § 13.26 Discontinuance of permit activity. When a...

  5. 50 CFR 622.270 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Dolphin and Wahoo Fishery Off the Atlantic States § 622.270 Permits. (a) Commercial vessel permits. (1) For a person aboard... first receive Atlantic dolphin or wahoo harvested in or from the EEZ, a Gulf and South Atlantic dealer...

  6. 50 CFR 679.4 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Permits. 679.4 Section 679.4 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE (CONTINUED) FISHERIES OF THE EXCLUSIVE ECONOMIC ZONE OFF ALASKA General § 679.4 Permits. (a) Requirements. Only persons who are...

  7. 50 CFR 21.23 - Scientific collecting permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific collecting permits. 21.23... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.23 Scientific...

  8. 50 CFR 21.23 - Scientific collecting permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... 50 Wildlife and Fisheries 8 2011-10-01 2011-10-01 false Scientific collecting permits. 21.23... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.23 Scientific...

  9. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  10. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  11. 30 CFR 912.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO... without permits issued and/or certificates required by the State of Idaho, pursuant to Idaho Code sections...

  12. 30 CFR 933.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...); an approval of dam construction (NCGS 143-215.108), an air pollution control permit (NCGS 143-215.26... in a soil conservation district (NCGS 139-9); and compliance with any county ordinance regarding...

  13. 15 CFR 904.320 - Nature of permit sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Nature of permit sanctions. 904.320 Section 904.320 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanction for Violations § 904.320 Nature of permit sanctions...

  14. 15 CFR 904.320 - Nature of permit sanctions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Nature of permit sanctions. 904.320 Section 904.320 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanction for Violations § 904.320 Nature of permit sanctions...

  15. 40 CFR 122.63 - Minor modifications of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Minor modifications of permits. 122.63..., Revocation and Reissuance, and Termination of Permits § 122.63 Minor modifications of permits. Upon the.... Any permit modification not processed as a minor modification under this section must be made for...

  16. 15 CFR 904.320 - Nature of permit sanctions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Nature of permit sanctions. 904.320 Section 904.320 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanction for Violations § 904.320 Nature of permit sanctions...

  17. 15 CFR 904.320 - Nature of permit sanctions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Nature of permit sanctions. 904.320 Section 904.320 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanction for Violations § 904.320 Nature of permit sanctions...

  18. 15 CFR 904.320 - Nature of permit sanctions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Nature of permit sanctions. 904.320 Section 904.320 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... PROCEDURES Permit Sanctions and Denials Permit Sanction for Violations § 904.320 Nature of permit sanctions...

  19. Identification of Provisions of EPA's Part 70 Operating Permits Regulation Applicable to Tribal Operating Permits Program

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. 50 CFR 17.23 - Economic hardship permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 2 2010-10-01 2010-10-01 false Economic hardship permits. 17.23 Section... Economic hardship permits. Upon receipt of a complete application, the Director may issue a permit... section in order to prevent undue economic hardship. The Director shall publish notice in the Federal...