Sample records for earth stations operating

  1. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  2. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  3. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  4. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  5. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  6. 47 CFR 25.220 - Non-conforming transmit/receive earth station operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and 17/24 GHz BSS feeder link applications in which the proposed earth station operations do not fall...) through (d)(1)(iv) of this section. The applicant will be authorized to transmit only to the satellite... operator acknowledging that the proposed operation of the subject non-conforming earth station with its...

  7. 47 CFR 25.220 - Non-conforming transmit/receive earth station operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... earth station operations. (a)(1) The requirements in this section apply to earth station applications of... analog video earth stations that are ineligible for routine licensing under § 25.211(d). (2) The... submit the certifications listed in paragraphs (d)(1)(i) through (d)(1)(iv) of this section. The...

  8. 47 CFR 97.209 - Earth station.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Earth station. 97.209 Section 97.209... SERVICE Special Operations § 97.209 Earth station. (a) Any amateur station may be an Earth station. A holder of any class operator license may be the control operator of an Earth station, subject to the...

  9. 47 CFR 97.209 - Earth station.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Earth station. 97.209 Section 97.209... SERVICE Special Operations § 97.209 Earth station. (a) Any amateur station may be an Earth station. A holder of any class operator license may be the control operator of an Earth station, subject to the...

  10. 47 CFR 97.209 - Earth station.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Earth station. 97.209 Section 97.209... SERVICE Special Operations § 97.209 Earth station. (a) Any amateur station may be an Earth station. A holder of any class operator license may be the control operator of an Earth station, subject to the...

  11. 47 CFR 97.209 - Earth station.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Earth station. 97.209 Section 97.209... SERVICE Special Operations § 97.209 Earth station. (a) Any amateur station may be an Earth station. A holder of any class operator license may be the control operator of an Earth station, subject to the...

  12. 47 CFR 97.209 - Earth station.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Earth station. 97.209 Section 97.209... SERVICE Special Operations § 97.209 Earth station. (a) Any amateur station may be an Earth station. A holder of any class operator license may be the control operator of an Earth station, subject to the...

  13. 47 CFR 25.220 - Non-conforming transmit/receive earth station operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., ESAA and 17/24 GHz BSS feeder link applications in which the proposed earth station operations do not... the certifications listed in paragraphs (d)(1)(i) through (d)(1)(iv) of this section. The applicant... subject non-conforming earth station with its satellite(s) has the potential to receive interference from...

  14. 47 CFR 25.220 - Non-conforming transmit/receive earth station operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... and 17/24 GHz BSS feeder link applications in which the proposed earth station operations do not fall... certifications listed in paragraphs (d)(1)(i) through (d)(1)(iv) of this section. The applicant will be... subject non-conforming earth station with its satellite(s) has the potential to receive interference from...

  15. 47 CFR 25.220 - Non-conforming transmit/receive earth station operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and 17/24 GHz BSS feeder link applications in which the proposed earth station operations do not fall... certifications listed in paragraphs (d)(1)(i) through (d)(1)(iv) of this section. The applicant will be... subject non-conforming earth station with its satellite(s) has the potential to receive interference from...

  16. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  17. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  18. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  19. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  20. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  1. 47 CFR 87.51 - Aircraft earth station commissioning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Aircraft earth station commissioning. 87.51... SERVICES AVIATION SERVICES Applications and Licenses § 87.51 Aircraft earth station commissioning. (a) [Reserved] (b) Aircraft earth stations authorized to operate in the Inmarsat space segment must display the...

  2. 47 CFR 87.51 - Aircraft earth station commissioning.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Aircraft earth station commissioning. 87.51... SERVICES AVIATION SERVICES Applications and Licenses § 87.51 Aircraft earth station commissioning. (a) [Reserved] (b) Aircraft earth stations authorized to operate in the Inmarsat space segment must display the...

  3. 47 CFR 87.51 - Aircraft earth station commissioning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Aircraft earth station commissioning. 87.51... SERVICES AVIATION SERVICES Applications and Licenses § 87.51 Aircraft earth station commissioning. (a) [Reserved] (b) Aircraft earth stations authorized to operate in the Inmarsat space segment must display the...

  4. 47 CFR 87.51 - Aircraft earth station commissioning.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Aircraft earth station commissioning. 87.51... SERVICES AVIATION SERVICES Applications and Licenses § 87.51 Aircraft earth station commissioning. (a) [Reserved] (b) Aircraft earth stations authorized to operate in the Inmarsat space segment must display the...

  5. 47 CFR 87.51 - Aircraft earth station commissioning.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Aircraft earth station commissioning. 87.51... SERVICES AVIATION SERVICES Applications and Licenses § 87.51 Aircraft earth station commissioning. (a) [Reserved] (b) Aircraft earth stations authorized to operate in the Inmarsat space segment must display the...

  6. 47 CFR 80.377 - Frequencies for ship earth stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Frequencies for ship earth stations. 80.377... SERVICES STATIONS IN THE MARITIME SERVICES Frequencies Ship Earth Stations § 80.377 Frequencies for ship earth stations. The frequency band 1626.5-1645.5 MHz is assignable for communication operations and...

  7. 47 CFR 80.377 - Frequencies for ship earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Frequencies for ship earth stations. 80.377... SERVICES STATIONS IN THE MARITIME SERVICES Frequencies Ship Earth Stations § 80.377 Frequencies for ship earth stations. The frequency band 1626.5-1645.5 MHz is assignable for communication operations and...

  8. 47 CFR 25.115 - Application for earth station authorizations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... earth station applications must be filed electronically through the International Bureau Filing System... transmitting earth stations in the Fixed-Satellite Service may file on FCC Form 312EZ if all of the following... band; (ii) The earth station(s) will not be installed or operated on ships, aircraft, or other moving...

  9. 47 CFR 25.115 - Application for earth station authorizations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., except that such earth station applications must be filed electronically through the International Bureau... transmitting earth station facilities are required to file on Form 312EZ, to the extent that form is available, in the following cases: (i) The earth station will operate in the 3700-4200 MHz and 5925-6425 MHz...

  10. LBR-2 Earth stations for the ACTS program

    NASA Technical Reports Server (NTRS)

    Oreilly, Michael; Jirberg, Russell; Spisz, Ernie

    1990-01-01

    The Low Burst Rate-2 (LBR-2) earth station being developed for NASA's Advanced Communications Technology Satellite (ACTS) is described. The LBR-2 is one of two earth station types that operate through the satellite's baseband processor. The LBR-2 is a small earth terminal (VSAT)-like earth station that is easily sited on a user's premises, and provides up to 1.792 megabits per second (MBPS) of voice, video, and data communications. Addressed here is the design of the antenna, the rf subsystems, the digital processing equipment, and the user interface equipment.

  11. Enabler operator station

    NASA Technical Reports Server (NTRS)

    Bailey, Andrea; Kietzman, John; King, Shirlyn; Stover, Rae; Wegner, Torsten

    1992-01-01

    The objective of this project was to design an onboard operator station for the conceptual Lunar Work Vehicle (LWV). The LWV would be used in the colonization of a lunar outpost. The details that follow, however, are for an Earth-bound model. The operator station is designed to be dimensionally correct for an astronaut wearing the current space shuttle EVA suit (which include life support). The proposed operator station will support and restrain an astronaut as well as to provide protection from the hazards of vehicle rollover. The threat of suit puncture is eliminated by rounding all corners and edges. A step-plate, located at the front of the vehicle, provides excellent ease of entry and exit. The operator station weight requirements are met by making efficient use of rigid members, semi-rigid members, and woven fabrics.

  12. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... under the World Trade Organization Basic Telecommunications Agreement. (b) Earth station applicants, or... addressed in this paragraph must be filed electronically through the International Bureau Filing System...

  13. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... under the World Trade Organization Basic Telecommunications Agreement. (b) Earth station applicants, or... addressed in this paragraph must be filed electronically through the International Bureau Filing System...

  14. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... under the World Trade Organization Basic Telecommunications Agreement. (b) Earth station applicants, or... addressed in this paragraph must be filed electronically through the International Bureau Filing System...

  15. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... paragraph (a) of this section must be filed electronically through the International Bureau Filing System... 47 Telecommunication 2 2014-10-01 2014-10-01 false Application requirements for earth stations...

  16. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... paragraph (a) of this section must be filed electronically through the International Bureau Filing System... 47 Telecommunication 2 2013-10-01 2013-10-01 false Application requirements for earth stations...

  17. 47 CFR 25.131 - Filing requirements and registration for receive-only earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... receive-only earth stations. 25.131 Section 25.131 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25..., subpart Y of this chapter. (b) Receive-only earth stations in the Fixed-Satellite Service that operate...

  18. 47 CFR 25.218 - Off-axis EIRP envelopes for FSS earth station operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Analog video earth station applications, and (3) Applications for feeder-link earth stations in the 17/24...BW/4 kHz For 9.2° 18 dBW/4 kHz For 48° 18 dBW/4 kHz For 48° <θ ≤85° −8 dBW/4 k...

  19. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  20. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  1. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  2. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  3. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  4. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    NASA's Earth Dome is seen at Union Station, Monday, April 22, 2013 in Washington. The Earth Dome housed two of NASA's Science Gallery exhibits as part of a NASA-sponsored Earth Day event at Union Station. Photo Credit: (NASA/Carla Cioffi)

  5. Service offerings and interfaces for the ACTS network of earth stations

    NASA Technical Reports Server (NTRS)

    Coney, T. A.; Dobyns, T. R.; Chitre, D. M.; Lindstrom, R.

    1988-01-01

    The NASA Advanced Communications Technology Satellite (ACTS) will use a network of about 20 earth stations to operate as a Mode 1 network. This network will support two ACTS program objectives: to verify the technical performance of ACTS Mode 1 operation in GEO and to demonstrate the types and quality of services that can be provided by an ACTS Mode 1 communications system. The terrestrial interface design is a critical element in assuring that these network earth stations will meet the objectives. In this paper, the applicable terrestrial interface design requirements, the resulting interface specifications, and the associated terrestrial input/output hardware are discussed. A functional block diagram of a network earth station is shown.

  6. 78 FR 67309 - Earth Stations Aboard Aircraft

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Communications Act of 1934, as amended, 47 U.S.C. 154(i), 154(j), 157(a), 302(a), 303(c), 303(e), 303(f), 303(g... Commission's Earth Station Aboard Aircraft, Report and Order (Order), which adopted licensing and service...-orbit space stations operating in the 10.95-11.2 GHz, 11.45-11.7 GHz, 11.7-12.2 GHz and 14.0-14.5 GHz...

  7. Enabler operator station. [lunar surface vehicle

    NASA Technical Reports Server (NTRS)

    Bailey, Andrea; Keitzman, John; King, Shirlyn; Stover, Rae; Wegner, Torsten

    1992-01-01

    The objective of this project was to design an onboard operator station for the conceptual Lunar Work Vehicle (LWV). This LWV would be used in the colonization of a lunar outpost. The details that follow, however, are for an earth-bound model. Several recommendations are made in the appendix as to the changes needed in material selection for the lunar environment. The operator station is designed dimensionally correct for an astronaut wearing the current space shuttle EVA suit (which includes life support). The proposed operator station will support and restrain an astronaut as well as provide protection from the hazards of vehicle rollover. The threat of suit puncture is eliminated by rounding all corners and edges. A step-plate, located at the front of the vehicle, provides excellent ease of entry and exit. The operator station weight requirements are met by making efficient use of grid members, semi-rigid members and woven fabrics.

  8. Simulation of interference between Earth stations and Earth-orbiting satellites

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1994-01-01

    It is often desirable to determine the potential for radio frequency interference between earth stations and orbiting spacecraft. This information can be used to select frequencies for radio systems to avoid interference or it can be used to determine if coordination between radio systems is necessary. A model is developed that will determine the statistics of interference between earth stations and elliptical orbiting spacecraft. The model uses orbital dynamics, detailed antenna patterns, and spectral characteristics to obtain accurate levels of interference at the victim receiver. The model is programmed into a computer simulation to obtain long-term statistics of interference. Two specific examples are shown to demonstrate the model. The first example is a simulation of interference from a fixed-satellite earth station to an orbiting scatterometer receiver. The second example is a simulation of interference from earth-exploration satellites to a deep-space earth station.

  9. 47 CFR 25.224 - Protection of receive-only earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Protection of receive-only earth stations in... receive-only earth stations in the 17/24 GHz BSS. (a) Notwithstanding § 25.209(c) of this part, receive-only earth stations operating in the 17/24 GHz broadcasting-satellite service can claim no greater...

  10. 47 CFR 25.224 - Protection of receive-only earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Protection of receive-only earth stations in... receive-only earth stations in the 17/24 GHz BSS. (a) Notwithstanding § 25.209(c) of this part, receive-only earth stations operating in the 17/24 GHz broadcasting-satellite service can claim no greater...

  11. 47 CFR 25.224 - Protection of receive-only earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Protection of receive-only earth stations in... receive-only earth stations in the 17/24 GHz BSS. (a) Notwithstanding § 25.209(c) of this part, receive-only earth stations operating in the 17/24 GHz broadcasting-satellite service can claim no greater...

  12. 47 CFR 25.224 - Protection of receive-only earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Protection of receive-only earth stations in... receive-only earth stations in the 17/24 GHz BSS. (a) Notwithstanding § 25.209(c) of this part, receive-only earth stations operating in the 17/24 GHz broadcasting-satellite service can claim no greater...

  13. 47 CFR 25.224 - Protection of receive-only earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Protection of receive-only earth stations in... receive-only earth stations in the 17/24 GHz BSS. (a) Notwithstanding § 25.209(c) of this part, receive-only earth stations operating in the 17/24 GHz broadcasting-satellite service can claim no greater...

  14. 47 CFR 80.51 - Ship earth station licensing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Ship earth station licensing. 80.51 Section 80... STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.51 Ship earth station licensing. A ship earth station must display the Commission license. [73 FR 4480, Jan. 25, 2008] ...

  15. 47 CFR 80.51 - Ship earth station licensing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Ship earth station licensing. 80.51 Section 80... STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.51 Ship earth station licensing. A ship earth station must display the Commission license. [73 FR 4480, Jan. 25, 2008] ...

  16. 47 CFR 80.51 - Ship earth station licensing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Ship earth station licensing. 80.51 Section 80... STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.51 Ship earth station licensing. A ship earth station must display the Commission license. [73 FR 4480, Jan. 25, 2008] ...

  17. 47 CFR 80.51 - Ship earth station licensing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Ship earth station licensing. 80.51 Section 80... STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.51 Ship earth station licensing. A ship earth station must display the Commission license. [73 FR 4480, Jan. 25, 2008] ...

  18. 47 CFR 80.51 - Ship earth station licensing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Ship earth station licensing. 80.51 Section 80... STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.51 Ship earth station licensing. A ship earth station must display the Commission license. [73 FR 4480, Jan. 25, 2008] ...

  19. 47 CFR 80.377 - Frequencies for ship earth stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Frequencies for ship earth stations. 80.377... SERVICES STATIONS IN THE MARITIME SERVICES Frequencies Ship Earth Stations § 80.377 Frequencies for ship earth stations. The frequency band 1626.5-1645.5 MHz is assignable for communication, radiodetermination...

  20. 47 CFR 80.377 - Frequencies for ship earth stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Frequencies for ship earth stations. 80.377... SERVICES STATIONS IN THE MARITIME SERVICES Frequencies Ship Earth Stations § 80.377 Frequencies for ship earth stations. The frequency band 1626.5-1645.5 MHz is assignable for communication, radiodetermination...

  1. 47 CFR 80.377 - Frequencies for ship earth stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Frequencies for ship earth stations. 80.377... SERVICES STATIONS IN THE MARITIME SERVICES Frequencies Ship Earth Stations § 80.377 Frequencies for ship earth stations. The frequency band 1626.5-1645.5 MHz is assignable for communication, radiodetermination...

  2. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    Jennifer Brennan, NASA EOSDIS Outreach Lead at NASA's Goddard Spaceflight Center, speaks to participants at a NASA Earth Day sponsored exhibit about satellite earth imagery, Monday, April 22, 2013 at Union Station in Washington. The NASA Science Gallery exhibits are being sponsored by NASA in honor of Earth Day. (Photo Credit: NASA/Carla Cioffi)

  3. 47 CFR 80.1119 - Receipt and acknowledgement of distress alerts by coast stations and coast earth stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... by coast stations and coast earth stations. 80.1119 Section 80.1119 Telecommunication FEDERAL... § 80.1119 Receipt and acknowledgement of distress alerts by coast stations and coast earth stations. (a... for coast stations.) (b) Coast earth stations in receipt of distress alerts must ensure that they are...

  4. 47 CFR 80.1119 - Receipt and acknowledgement of distress alerts by coast stations and coast earth stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... by coast stations and coast earth stations. 80.1119 Section 80.1119 Telecommunication FEDERAL... § 80.1119 Receipt and acknowledgement of distress alerts by coast stations and coast earth stations. (a... for coast stations.) (b) Coast earth stations in receipt of distress alerts must ensure that they are...

  5. 47 CFR 80.1119 - Receipt and acknowledgement of distress alerts by coast stations and coast earth stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... by coast stations and coast earth stations. 80.1119 Section 80.1119 Telecommunication FEDERAL... § 80.1119 Receipt and acknowledgement of distress alerts by coast stations and coast earth stations. (a... for coast stations.) (b) Coast earth stations in receipt of distress alerts must ensure that they are...

  6. 47 CFR 80.1119 - Receipt and acknowledgement of distress alerts by coast stations and coast earth stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by coast stations and coast earth stations. 80.1119 Section 80.1119 Telecommunication FEDERAL... § 80.1119 Receipt and acknowledgement of distress alerts by coast stations and coast earth stations. (a... for coast stations.) (b) Coast earth stations in receipt of distress alerts must ensure that they are...

  7. 47 CFR 80.1119 - Receipt and acknowledgement of distress alerts by coast stations and coast earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... by coast stations and coast earth stations. 80.1119 Section 80.1119 Telecommunication FEDERAL... § 80.1119 Receipt and acknowledgement of distress alerts by coast stations and coast earth stations. (a... for coast stations.) (b) Coast earth stations in receipt of distress alerts must ensure that they are...

  8. Earth Science and Applications attached payloads on Space Station

    NASA Technical Reports Server (NTRS)

    Wicks, Thomas G.; Arnold, Ralph R.

    1990-01-01

    This paper describes the Office of Space Science and Applications' process for Attached Payloads on Space Station Freedom from development through on-orbit operations. Its primary objectives are to detail the sequential steps of the attached payload methodology by tracing in particular the selected Earth Science and Applications' payloads through this flow and relate the integral role of Marshall Space Flight Center's Science Utilization Management function of integration and operations.

  9. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    Dr. Thomas Wagner, NASA Program Scientist for the cryosphere, gives a presentation on observing the Earth's Poles in front of the Hyperwall at at a NASA-sponsored Earth Day event at Union Station, Monday April 22, 2013 in Washington. Photo Credit: (NASA/Carla Cioffi)

  10. 47 CFR 25.115 - Application for earth station authorizations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., except that such earth station applications must be filed electronically through the International Bureau... transmitting earth station facilities are required to file on Form 312EZ, to the extent that form is available, in the following cases: (i) The earth station will transmit in the 3700-4200 MHz and 5925-6425 MHz...

  11. 47 CFR 25.115 - Application for earth station authorizations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., except that such earth station applications must be filed electronically through the International Bureau... transmitting earth station facilities are required to file on Form 312EZ, to the extent that form is available, in the following cases: (i) The earth station will transmit in the 3700-4200 MHz and 5925-6425 MHz...

  12. 47 CFR 25.115 - Application for earth station authorizations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., except that such earth station applications must be filed electronically through the International Bureau... transmitting earth station facilities are required to file on Form 312EZ, to the extent that form is available, in the following cases: (i) The earth station will transmit in the 3700-4200 MHz and 5925-6425 MHz...

  13. 47 CFR 80.1121 - Receipt and acknowledgement of distress alerts by ship stations and ship earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... by ship stations and ship earth stations. 80.1121 Section 80.1121 Telecommunication FEDERAL... § 80.1121 Receipt and acknowledgement of distress alerts by ship stations and ship earth stations. (a) Ship or ship earth stations that receive a distress alert must, as soon as possible, inform the master...

  14. 47 CFR 80.1121 - Receipt and acknowledgement of distress alerts by ship stations and ship earth stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by ship stations and ship earth stations. 80.1121 Section 80.1121 Telecommunication FEDERAL... § 80.1121 Receipt and acknowledgement of distress alerts by ship stations and ship earth stations. (a) Ship or ship earth stations that receive a distress alert must, as soon as possible, inform the master...

  15. 47 CFR 80.1121 - Receipt and acknowledgement of distress alerts by ship stations and ship earth stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... by ship stations and ship earth stations. 80.1121 Section 80.1121 Telecommunication FEDERAL... § 80.1121 Receipt and acknowledgement of distress alerts by ship stations and ship earth stations. (a) Ship or ship earth stations that receive a distress alert must, as soon as possible, inform the master...

  16. 47 CFR 80.1121 - Receipt and acknowledgement of distress alerts by ship stations and ship earth stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... by ship stations and ship earth stations. 80.1121 Section 80.1121 Telecommunication FEDERAL... § 80.1121 Receipt and acknowledgement of distress alerts by ship stations and ship earth stations. (a) Ship or ship earth stations that receive a distress alert must, as soon as possible, inform the master...

  17. 47 CFR 80.1121 - Receipt and acknowledgement of distress alerts by ship stations and ship earth stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... by ship stations and ship earth stations. 80.1121 Section 80.1121 Telecommunication FEDERAL... § 80.1121 Receipt and acknowledgement of distress alerts by ship stations and ship earth stations. (a) Ship or ship earth stations that receive a distress alert must, as soon as possible, inform the master...

  18. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    A participant at NASA's Earth Day Science Gallery Exhibit calculates his carbon footprint at the Carbon Footprint Estimator, Monday, April 22, 2013 at Union Station in Washington. The NASA Science Gallery exhibits are being sponsored by NASA in honor of Earth Day. (Photo Credit: NASA/Carla Cioffi)

  19. ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.; Struharik, Steven J.; Diamond, John J.; Stewart, David

    2000-01-01

    The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with the ACTS satellite. The ACTS experiment's program proposed to validate Ka-band satellite and ground station technology. demonstrate future telecommunication services. demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals (Part 1) and the lessons learned throughout their six year operation including the inclined orbit phase of operations (Full Report). An overview of the Ka-band technology and components developed for the ACTS ground stations is presented. Next. the performance of the ground station technology and its evolution during the ACTS campaign are discussed to illustrate the technical tradeoffs made during the program and highlight technical advances by industry to support the ACTS experiments program and terminal operations. Finally. lessons learned during development and operation of the user terminals are discussed for consideration of commercial adoption into future Ka-band systems. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector based offset-fed antenna systems ranging in size from 0.35m to 3.4m antenna diameter. Gateway earth stations included two systems, referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET). The NGS provides tracking, telemetry, and control (TT&C) and Time Division Multiple Access (TDMA) network control functions. The LET supports technology verification and high data rate experiments. The ground

  20. 47 CFR 25.130 - Filing requirements for transmitting earth stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... such earth station license applications must be filed electronically through the International Bureau... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.130 Filing... with § 25.203 shall be provided for earth stations transmitting in the frequency bands shared with...

  1. 47 CFR 25.130 - Filing requirements for transmitting earth stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... such earth station license applications must be filed electronically through the International Bureau... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.130 Filing... in accordance with § 25.203 shall be provided for earth stations transmitting in the frequency bands...

  2. 47 CFR 25.130 - Filing requirements for transmitting earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... such earth station license applications must be filed electronically through the International Bureau... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.130 Filing... in accordance with § 25.203 shall be provided for earth stations transmitting in the frequency bands...

  3. 47 CFR 25.130 - Filing requirements for transmitting earth stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... such earth station license applications must be filed electronically through the International Bureau... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.130 Filing... with § 25.203 shall be provided for earth stations transmitting in the frequency bands shared with...

  4. 47 CFR 25.130 - Filing requirements for transmitting earth stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... such earth station license applications must be filed electronically through the International Bureau... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.130 Filing... with § 25.203 shall be provided for earth stations transmitting in the frequency bands shared with...

  5. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    Holli Riebeek, Education and Public Outreach Lead for NASA/Landsat Mission at NASA's Goddard Spaceflight Center, holds up Landsat maps NASA's Earth Day Science Gallery Exhibit, Monday, April 22, 2013 at Union Station in Washington. The NASA Science Gallery exhibits are being sponsored by NASA in honor of Earth Day. (Photo Credit: NASA/Carla Cioffi)

  6. COMS normal operation for Earth Observation mission

    NASA Astrophysics Data System (ADS)

    Cho, Young-Min

    2012-09-01

    Communication Ocean Meteorological Satellite (COMS) for the hybrid mission of meteorological observation, ocean monitoring, and telecommunication service was launched onto Geostationary Earth Orbit on June 27, 2010 and it is currently under normal operation service since April 2011. The COMS is located on 128.2° East of the geostationary orbit. In order to perform the three missions, the COMS has 3 separate payloads, the meteorological imager (MI), the Geostationary Ocean Color Imager (GOCI), and the Ka-band antenna. Each payload is dedicated to one of the three missions, respectively. The MI and GOCI perform the Earth observation mission of meteorological observation and ocean monitoring, respectively. For this Earth observation mission the COMS requires daily mission commands from the satellite control ground station and daily mission is affected by the satellite control activities. For this reason daily mission planning is required. The Earth observation mission operation of COMS is described in aspects of mission operation characteristics and mission planning for the normal operation services of meteorological observation and ocean monitoring. And the first year normal operation results after the In-Orbit-Test (IOT) are investigated through statistical approach to provide the achieved COMS normal operation status for the Earth observation mission.

  7. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    Holli Riebeek, Education and Public Outreach Lead for NASA/Landsat Mission at NASA's Goddard Spaceflight Center, is seen speaking to students at NASA's Earth Day Science Gallery Exhibit, Monday, April 22, 2013 at Union Station in Washington. The NASA Science Gallery exhibits are being sponsored by NASA in honor of Earth Day. (Photo Credit: NASA/Carla Cioffi)

  8. The Earth Based Ground Stations Element of the Lunar Program

    NASA Technical Reports Server (NTRS)

    Gal-Edd, Jonathan; Fatig, Curtis; Schier, James; Lee, Charles

    2007-01-01

    The Lunar Architecture Team (LAT) is responsible for developing a concept for building and supporting a lunar outpost with several exploration capabilities such as rovers, colonization, and observatories. The lunar outpost is planned to be located at the Moon's South Pole. The LAT Communications and Navigation Team (C&N) is responsible for defining the network infrastructure to support the lunar outpost. The following elements are needed to support lunar outpost activities: A Lunar surface network based on industry standard wireless 802.xx protocols, relay satellites positioned 180 degrees apart to provide South Pole coverage for the half of the lunar 28-day orbit that is obscured from Earth view, earth-based ground stations deployed at geographical locations 120 degrees apart. This paper will focus on the Earth ground stations of the lunar architecture. Two types of ground station networks are discussed. One provides Direct to Earth (DTE) support to lunar users using Kaband 23/26Giga-Hertz (GHz) communication frequencies. The second supports the Lunar Relay Satellite (LRS) that will be using Ka-band 40/37GHz (Q-band). This paper will discuss strategies to provide a robust operational network in support of various lunar missions and trades of building new antennas at non-NASA facilities, to improve coverage and provide site diversification for handling rain attenuation.

  9. Techniques to minimize adjacent band emissions from Earth Exploration Satellites to protect the Space Research (Category B) Earth Stations in the 8400-8450 MHz band

    NASA Technical Reports Server (NTRS)

    Wang, Charles C.; Sue, Miles K.; Manshadi, Farzin

    2004-01-01

    The Earth Exploration Satellites operating in the 8025-8400 MHz band can have strong adjacent band emissions on the8400-8450 MHz band which is allocated for Space Research (Category-B). The unwanted emission may exceed the protection criterion establish by the ITU-R for the protection of the Space Research (Category B) earth stations, i.e., deep-space earth stations. An SFCG Action Item (SF 23/14) was created during the 23rd SFCG meeting to explore technical and operational techniques to reduce the adjacent band emissions. In response to this action item, a study was conducted and results are presented in this document.

  10. 75 FR 1285 - Vehicle-Mounted Earth Stations (VMES)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Earth Stations (VMES) AGENCY: Federal Communications Commission. ACTION: Final Rule; announcement of...-Mounted Earth Stations in Certain Frequency Bands Allocated to the Fixed-Satellite Service, IB Docket No...(i), 4(j), 7(a), 301, 303(c), 303(f), 303(g), 303(r), 303(y) and 308 of the Communications Act of...

  11. ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.; Struharik, Steven J.; Diamond, John J.; Stewart, David

    2000-01-01

    The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with ACTS. The ACTS experiments program proposed to validate Ka-band satellite and ground-station technology, demonstrate future telecommunication services, demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals and the lessons learned throughout their 6-year operation, including the inclined orbit phase-of-operations. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector-based offset-fed antenna systems with antennas ranging in size from 0.35 to 3.4 in. in diameter. Gateway earth stations included two systems referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET).

  12. 47 CFR 25.104 - Preemption of local zoning of earth stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Preemption of local zoning of earth stations... SERVICES SATELLITE COMMUNICATIONS General § 25.104 Preemption of local zoning of earth stations. (a) Any... reception by satellite earth station antennas, or imposes more than minimal costs on users of such antennas...

  13. 47 CFR 25.104 - Preemption of local zoning of earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Preemption of local zoning of earth stations... SERVICES SATELLITE COMMUNICATIONS General § 25.104 Preemption of local zoning of earth stations. (a) Any... reception by satellite earth station antennas, or imposes more than minimal costs on users of such antennas...

  14. 47 CFR 25.104 - Preemption of local zoning of earth stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Preemption of local zoning of earth stations... SERVICES SATELLITE COMMUNICATIONS General § 25.104 Preemption of local zoning of earth stations. (a) Any... reception by satellite earth station antennas, or imposes more than minimal costs on users of such antennas...

  15. 47 CFR 25.104 - Preemption of local zoning of earth stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Preemption of local zoning of earth stations... SERVICES SATELLITE COMMUNICATIONS General § 25.104 Preemption of local zoning of earth stations. (a) Any... reception by satellite earth station antennas, or imposes more than minimal costs on users of such antennas...

  16. 47 CFR 25.104 - Preemption of local zoning of earth stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Preemption of local zoning of earth stations... SERVICES SATELLITE COMMUNICATIONS General § 25.104 Preemption of local zoning of earth stations. (a) Any... reception by satellite earth station antennas, or imposes more than minimal costs on users of such antennas...

  17. Communications satellite systems operations with the space station. Volume 3: Supplementary technical report

    NASA Technical Reports Server (NTRS)

    Price, K. M.; Russell, P.; Weyandt, C.

    1988-01-01

    The NASA space station has the potential to provide significant economic benefits to commercial communications satellite operators. The initial reports qunatified the benefits of space-based activities and assessed the impacts on the satellite design and the space station. Results are given for the following additional tasks: quantify the value of satellite retrievability operations and define its operational aspects; evaluate the use of expendable launch vehicles for transportation of satellites from the Earth to the space station; and quantify the economic value of modular satellites that are assembled and serviced in space.

  18. 47 CFR 25.218 - Off-axis EIRP envelopes for FSS earth station operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) ESV and VMES applications, (2) Analog video earth station applications, (3) Applications for feeder... ≤ 7° 0 dBW/4 kHz For 7° 18 dBW/4 kHz For 48° 18 dBW/4 kHz For 48° < θ ≤ 85° −8 dBW/4 kHz For 85° < θ ≤ 180° where θ is defined in...

  19. 47 CFR 25.218 - Off-axis EIRP envelopes for FSS earth station operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) ESV and VMES applications, (2) Analog video earth station applications, (3) Applications for feeder... ≤ 7° 0 dBW/4 kHz For 7° 18 dBW/4 kHz For 48° 18 dBW/4 kHz For 48° < θ ≤ 85° −8 dBW/4 kHz For 85° < θ ≤ 180° where θ is defined in...

  20. 47 CFR 25.218 - Off-axis EIRP envelopes for FSS earth station operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) ESV and VMES applications, (2) Analog video earth station applications, (3) Applications for feeder... ≤ 7° 0 dBW/4 kHz For 7° 18 dBW/4 kHz For 48° 18 dBW/4 kHz For 48° < θ ≤ 85° −8 dBW/4 kHz For 85° < θ ≤ 180° where θ is defined in...

  1. Low Earth orbit environmental effects on the space station photovoltaic power generation systems

    NASA Technical Reports Server (NTRS)

    Nahra, Henry K.

    1987-01-01

    A summary of the Low Earth Orbital Environment, its impact on the Photovoltaic Power systems of the space station and the solutions implemented to resolve the environmental concerns or issues are described. Low Earth Orbital Environment (LEO) presents several concerns to the Photovoltaic power systems of the space station. These concerns include atomic oxygen interaction with the polymeric substrate of the solar arrays, ionized environment effects on the array operating voltage, the effects of the meteoroids and debris impacts and penetration through the different layers of the solar cells and their circuits, and the high energy particle and radiation effects on the overall solar array performance. Potential solutions to some of the degrading environmental interactions that will provide the photovoltaic power system of the space station with the desired life are also summarized.

  2. 47 CFR 25.209 - Earth station antenna performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.209 Earth station antenna performance standards... transmission from an earth station in the Fixed-Satellite Service shall lie below the relevant envelope defined in paragraphs (a)(1) through (4) of this section: (1) In the plane of the geostationary satellite...

  3. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    Michael Meyer, lead scientist for NASA's Mars Exploration Program at NASA Headquarters speaks in front of the Hyperwall at a NASA-sponsored Earth Day event at Union Station, Monday April 22, 2013 in Washington. Photo Credit: (NASA/Carla Cioffi)

  4. 47 CFR 25.209 - Earth station antenna performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.209 Earth station antenna performance standards. (a) The gain of any antenna to be employed in transmission from an earth station in the Fixed-Satellite Service shall lie below the envelope defined in paragraphs (a)(1) through (4) of this section: (1...

  5. 47 CFR 80.1185 - Supplemental eligibility for mobile-satellite stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... station license for a ship earth station may be issued to: (1) The owner or operator of a ship. (2) A... operator of the ship aboard which the ship earth station is to be installed and operated. (b) A station license for a portable ship earth station may be issued to the owner or operator of portable earth station...

  6. 47 CFR 80.1185 - Supplemental eligibility for mobile-satellite stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... station license for a ship earth station may be issued to: (1) The owner or operator of a ship. (2) A... operator of the ship aboard which the ship earth station is to be installed and operated. (b) A station license for a portable ship earth station may be issued to the owner or operator of portable earth station...

  7. 47 CFR 80.1185 - Supplemental eligibility for mobile-satellite stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... station license for a ship earth station may be issued to: (1) The owner or operator of a ship. (2) A... operator of the ship aboard which the ship earth station is to be installed and operated. (b) A station license for a portable ship earth station may be issued to the owner or operator of portable earth station...

  8. 47 CFR 80.1185 - Supplemental eligibility for mobile-satellite stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... station license for a ship earth station may be issued to: (1) The owner or operator of a ship. (2) A... operator of the ship aboard which the ship earth station is to be installed and operated. (b) A station license for a portable ship earth station may be issued to the owner or operator of portable earth station...

  9. 47 CFR 80.1185 - Supplemental eligibility for mobile-satellite stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... station license for a ship earth station may be issued to: (1) The owner or operator of a ship. (2) A... operator of the ship aboard which the ship earth station is to be installed and operated. (b) A station license for a portable ship earth station may be issued to the owner or operator of portable earth station...

  10. Forecasting the Economic Impact of Future Space Station Operations

    NASA Technical Reports Server (NTRS)

    Summer, R. A.; Smolensky, S. M.; Muir, A. H.

    1967-01-01

    Recent manned and unmanned Earth-orbital operations have suggested great promise of improved knowledge and of substantial economic and associated benefits to be derived from services offered by a space station. Proposed application areas include agriculture, forestry, hydrology, public health, oceanography, natural disaster warning, and search/rescue operations. The need for reliable estimates of economic and related Earth-oriented benefits to be realized from Earth-orbital operations is discussed and recent work in this area is reviewed. Emphasis is given to those services based on remote sensing. Requirements for a uniform, comprehensive and flexible methodology are discussed. A brief review of the suggested methodology is presented. This methodology will be exercised through five case studies which were chosen from a gross inventory of almost 400 user candidates. The relationship of case study results to benefits in broader application areas is discussed, Some management implications of possible future program implementation are included.

  11. 47 CFR 25.132 - Verification of earth station antenna performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Verification of earth station antenna... Verification of earth station antenna performance standards. (a)(1) Except for applications for 20/30 GHz earth... the antenna manufacturer on representative equipment in representative configurations, and the test...

  12. 47 CFR 25.129 - Equipment authorization for portable earth-station transceivers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Equipment authorization for portable earth... Requirements § 25.129 Equipment authorization for portable earth-station transceivers. (a) Except as expressly... earth-station transceivers subject to regulation under part 25. This requirement does not apply, however...

  13. 47 CFR 25.129 - Equipment authorization for portable earth-station transceivers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Equipment authorization for portable earth... Requirements § 25.129 Equipment authorization for portable earth-station transceivers. (a) Except as expressly... earth-station transceivers subject to regulation under part 25. This requirement does not apply, however...

  14. 47 CFR 25.129 - Equipment authorization for portable earth-station transceivers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Equipment authorization for portable earth... Requirements § 25.129 Equipment authorization for portable earth-station transceivers. (a) Except as expressly... earth-station transceivers subject to regulation under part 25. This requirement does not apply, however...

  15. 47 CFR 25.129 - Equipment authorization for portable earth-station transceivers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Equipment authorization for portable earth... Requirements § 25.129 Equipment authorization for portable earth-station transceivers. (a) Except as expressly... earth-station transceivers subject to regulation under part 25. This requirement does not apply, however...

  16. 47 CFR 25.132 - Verification of earth station antenna performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Verification of earth station antenna... Verification of earth station antenna performance standards. (a)(1) All applications for transmitting earth... pursuant to § 2.902 of this chapter from the manufacturer of each antenna that the results of a series of...

  17. 47 CFR 25.132 - Verification of earth station antenna performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Verification of earth station antenna... Verification of earth station antenna performance standards. (a)(1) All applications for transmitting earth... pursuant to § 2.902 of this chapter from the manufacturer of each antenna that the results of a series of...

  18. 47 CFR 25.132 - Verification of earth station antenna performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Verification of earth station antenna... Verification of earth station antenna performance standards. (a)(1) All applications for transmitting earth... pursuant to § 2.902 of this chapter from the manufacturer of each antenna that the results of a series of...

  19. Space station operations management

    NASA Technical Reports Server (NTRS)

    Cannon, Kathleen V.

    1989-01-01

    Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

  20. Compact earth stations, hubs for energy industry expanding

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shimabukuro, T.

    1992-02-01

    That paper reports that advances in gallium arsenide (GaAs) technology, monolithic microwave integrated circuits (MMIC) and large scale integrated (VLSF) circuits, have contributed to the mass production of very reliable small aperture terminals (VSATs). Less publicized, but equally important to multinational energy organizations, are recent developments in compact earth station design and solid-state hubs for VSAT networks made possible by the new technology. Many applications are suited for the energy industry that involve compact earth station terminals and hubs. The first group of applications describes the use of GTE's ACES earth station for the Zaire Gulf Oil Co. in Zairemore » and for AMOCO in Trinidad. The second group of applications describes the compact hub for VSAT networks, which could potentially have a number of data communication uses in the energy industry, such as, IBM/SNA, X.25, or supervisory control an data acquisition (SCADA) applications.« less

  1. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    Izolda Trakhtenberg, Science Educator at NASA Goddard Spaceflight Center, conducts an experiment with students to create a cloud in a bottle, Monday, April 22, 2013 at Union Station in Washington. The NASA Science Gallery exhibits are being sponsored by NASA in honor of Earth Day. (Photo Credit: NASA/Carla Cioffi)

  2. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    Todd Toth, Science Educator at NASA Goddard Spaceflight Center, conducts an experiment with students to create a cloud in a bottle, Monday, April 22, 2013 at Union Station in Washington. The NASA Science Gallery exhibits are being sponsored by NASA in honor of Earth Day. (Photo Credit: NASA/Carla Cioffi)

  3. Earth Day at Union Station

    NASA Image and Video Library

    2013-04-22

    Students assemble balloon race cars and Alka-Seltzer film canister rockets to demonstrate Newton's third Law of motion at the NASA Science Gallery at Union Station, Monday, April 22, 2013 in Washington. The NASA Science Gallery exhibits are being sponsored by NASA in honor of Earth Day. (Photo Credit: NASA/Carla Cioffi)

  4. Earth observation mission operation of COMS during in-orbit test

    NASA Astrophysics Data System (ADS)

    Cho, Young-Min

    2011-11-01

    Communication Ocean Meteorological Satellite (COMS) for the hybrid mission of meteorological observation, ocean monitoring, and telecommunication service was launched onto Geostationary Earth Orbit on June 27, 2010 and it is currently under normal operation service after the In-Orbit Test (IOT) phase. The COMS is located on 128.2° East of the geostationary orbit. In order to perform the three missions, the COMS has 3 separate payloads, the meteorological imager (MI), the Geostationary Ocean Color Imager (GOCI), and the Ka-band antenna. Each payload is dedicated to one of the three missions, respectively. The MI and GOCI perform the Earth observation mission of meteorological observation and ocean monitoring, respectively. During the IOT phase the functionality and the performance of many aspects of the COMS satellite and ground station have been checked through the Earth observation mission operation for the observation of the meteorological phenomenon over several areas of the Earth and the monitoring of marine environments around the Korean peninsula. The Earth observation mission operation of COMS during the IOT phase is introduced in terms of mission operation characteristics, mission planning, and mission operation results for the missions of meteorological observation and ocean monitoring, respectively.

  5. 47 CFR 25.221 - Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 3700-4200 MHz...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... on Vessels (ESVs) receiving in the 3700-4200 MHz (space-to-Earth) band and transmitting in the 5925-6425 MHz (Earth-to-space) band, operating with GSO Satellites in the Fixed-Satellite Service. 25.221... SATELLITE COMMUNICATIONS Technical Standards § 25.221 Blanket Licensing provisions for Earth Stations on...

  6. 47 CFR 25.271 - Control of transmitting stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...

  7. 47 CFR 25.271 - Control of transmitting stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...

  8. 47 CFR 25.271 - Control of transmitting stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...

  9. 47 CFR 25.271 - Control of transmitting stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...

  10. 47 CFR 25.271 - Control of transmitting stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...

  11. 47 CFR 25.131 - Filing requirements for receive-only earth stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.131 Filing... in §§ 25.130(a)(1) through 25.130(a)(5). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions...

  12. 47 CFR 25.131 - Filing requirements for receive-only earth stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.131 Filing... in §§ 25.130(a)(1) through 25.130(a)(5). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions...

  13. 47 CFR 25.131 - Filing requirements for receive-only earth stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.131 Filing... in §§ 25.130(a)(1) through 25.130(a)(5). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions...

  14. 47 CFR 25.131 - Filing requirements for receive-only earth stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.131 Filing... in §§ 25.130(a)(1) through 25.130(a)(5). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions...

  15. Design requirements for operational earth resources ground data processing

    NASA Technical Reports Server (NTRS)

    Baldwin, C. J.; Bradford, L. H.; Burnett, E. S.; Hutson, D. E.; Kinsler, B. A.; Kugle, D. R.; Webber, D. S.

    1972-01-01

    Realistic tradeoff data and evaluation techniques were studied that permit conceptual design of operational earth resources ground processing systems. Methodology for determining user requirements that utilize the limited information available from users is presented along with definitions of sensor capabilities projected into the shuttle/station era. A tentative method is presented for synthesizing candidate ground processing concepts.

  16. International two-way satellite time transfers using INTELSAT space segment and small Earth stations

    NASA Technical Reports Server (NTRS)

    Veenstra, Lester B.

    1990-01-01

    The satellite operated by the International Telecommunications Satellite Organization (INTELSAT) provides new and unique capabilities for the coordinates of international time scales on a world wide basis using the two-way technique. A network of coordinated clocks using small earth stations collocated with the scales is possible. Antennas as small as 1.8 m at K-band and 3 m at C-band transmitting powers of less than 1 W will provide signals with time jitters of less than 1 ns existing spread spectrum modems. One way time broadcasting is also possible, under the INTELSAT INTELNET system, possibly using existing international data distribution (press and financial) systems that are already operating spread spectrum systems. The technical details of the satellite and requirements on satellite earth stations are given. The resources required for a regular operational international time transfer service are analyzed with respect to the existing international digital service offerings of the INTELSAT Business Service (IBS) and INTELNET. Coverage areas, typical link budgets, and a summary of previous domestic and international work using this technique are provided. Administrative procedures for gaining access to the space segment are outlined. Contact information for local INTELSAT signatories is listed.

  17. Space solar power stations. Problems of energy generation and using its on the earth surface and nearest cosmos

    NASA Astrophysics Data System (ADS)

    Sinkevich, OA; Gerasimov, DN; Glazkov, VV

    2017-11-01

    Three important physical and technical problems for solar power stations (SPS) are considered: collection of solar energy and effective conversion of this energy to electricity in space power stations, energy transportation by the microwave beam to the Earth surface and direct utilization of the microwave beam energy for global environmental problems. Effectiveness of solar energy conversion into electricity in space power stations using gas and steam turbines plants, and magneto-hydrodynamic generator (MHDG) are analyzed. The closed cycle MHDG working on non-equilibrium magnetized plasmas of inert gases seeded with the alkaline metal vapors are considered. The special emphases are placed on MHDG and gas-turbine installations that are operating without compressor. Also opportunities for using the produced by space power stations energy for ecological needs on Earth and in Space are discussed.

  18. Amateur Radio on the International Space Station: The First Operational Payload on the ISS

    NASA Technical Reports Server (NTRS)

    Bauer, Frank H.; McFadin, Lou; Steiner, Mark D.; Conley, Carolynn L.

    2002-01-01

    As astronauts and cosmonauts have adapted to life on the International Space Station (ISS), they have found amateur radio and its connection to life on Earth to be a important on-board companion and a substantial psychological boost. Since its first use in November 2000, the first five expedition crews have utilized the amateur radio station in the Functional Cargo Block (also referred to as the FGB or Zarya module) to talk to thousands of students in schools, to their families on Earth, and to amateur radio operators around the world. This paper will discuss the development, qualification, installation and operation of the amateur radio system. It will also discuss some of the challenges that the amateur radio international team of volunteers overcame to bring its first phase of equipment on ISS to fruition.

  19. Station coordinates, baselines, and earth rotation from Lageos laser ranging - 1976-1984

    NASA Technical Reports Server (NTRS)

    Tapley, B. D.; Schultz, B. E.; Eanes, R. J.

    1985-01-01

    The orbit of the Lageos satellite is well suited as a reference frame for studying the rotation of the earth and the relative motion of points on the earth's crust. The satellite laser measurements can determine the location of a set of tracking stations in an appropriate terrestrial coordinate system. The motion of the earth's rotation axis relative to this system can be studied on the basis of the established tracking station locations. The present investigation is concerned with an analysis of 7.7 years of Lageos laser ranging data. In the first solution considered, the entire data span was used to adjust a single set of station positions simultaneously with orbit and earth rotation parameters. Attention is given to the accuracy of earth rotation parameters which are determined as an inherent part of the solution process.

  20. Circumlunar Free-Return Cycler Orbits for a Manned Earth-Moon Space Station

    NASA Technical Reports Server (NTRS)

    Genova, Anthony L.; Aldrin, Buzz

    2015-01-01

    Multiple free-return circumlunar cycler orbits were designed to allow regular travel between the Earth and Moon by a manned space station. The presented cycler orbits contain circumlunar free-return "figure-8" segments and yield lunar encounters every month. Smaller space "taxi" vehicles can rendezvous with (and depart from) the cycling Earth-Moon space station to enter lunar orbit (and/or land on the lunar surface), return to Earth, or reach destinations including Earth-Moon L1 and L2 halo orbits, near-Earth objects (NEOs), Venus, and Mars. To assess the practicality of the selected orbits, relevant cycler characteristics (including (Delta)V maintenance requirements) are presented and compared.

  1. Space Station Freedom operations costs

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Williams, Gregory J.

    1988-01-01

    Measures to reduce the operation costs of the Space Station which can be implemented in the design and development stages are discussed. Operational functions are described in the context of an overall operations concept. The provisions for operations cost responsibilities among the partners in the Space Station program are presented. Cost estimating methodologies and the way in which operations costs affect the design and development process are examined.

  2. Analysis of Delay Fluctuations on Two-Way Time Transfer Earth Stations

    DTIC Science & Technology

    2007-11-01

    Two Way Satellite Time and Frequency Transfer ( TWSTFT ) has become one of the major techniques to compare atomic time scales and primary clocks over...the result of TWSTFT . On the TL’s earth station, the most of the equipment is located outside, including the up- and down-converters, solid-state...light/shade, wind speed, humidity, and thermal circulation, may affect the TWSTFT earth station. These conditions may cause both the change of path

  3. Space Station crew workload - Station operations and customer accommodations

    NASA Technical Reports Server (NTRS)

    Shinkle, G. L.

    1985-01-01

    The features of the Space Station which permit crew members to utilize work time for payload operations are discussed. The user orientation, modular design, nonstressful flight regime, in space construction, on board control, automation and robotics, and maintenance and servicing of the Space Station are examined. The proposed crew size, skills, and functions as station operator and mission specialists are described. Mission objectives and crew functions, which include performing material processing, life science and astronomy experiments, satellite and payload equipment servicing, systems monitoring and control, maintenance and repair, Orbital Maneuvering Vehicle and Mobile Remote Manipulator System operations, on board planning, housekeeping, and health maintenance and recreation, are studied.

  4. 47 CFR 25.216 - Limits on emissions from mobile earth stations for protection of aeronautical radionavigation...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Limits on emissions from mobile earth stations... Technical Standards § 25.216 Limits on emissions from mobile earth stations for protection of aeronautical radionavigation-satellite service. (a) The e.i.r.p. density of emissions from mobile earth stations placed in...

  5. 47 CFR 25.216 - Limits on emissions from mobile earth stations for protection of aeronautical radionavigation...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Limits on emissions from mobile earth stations... Technical Standards § 25.216 Limits on emissions from mobile earth stations for protection of aeronautical radionavigation-satellite service. (a) The e.i.r.p. density of emissions from mobile earth stations placed in...

  6. 47 CFR 25.216 - Limits on emissions from mobile earth stations for protection of aeronautical radionavigation...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Limits on emissions from mobile earth stations... Technical Standards § 25.216 Limits on emissions from mobile earth stations for protection of aeronautical radionavigation-satellite service. (a) The e.i.r.p. density of emissions from mobile earth stations placed in...

  7. 47 CFR 25.216 - Limits on emissions from mobile earth stations for protection of aeronautical radionavigation...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Limits on emissions from mobile earth stations... Technical Standards § 25.216 Limits on emissions from mobile earth stations for protection of aeronautical radionavigation-satellite service. (a) The e.i.r.p. density of emissions from mobile earth stations placed in...

  8. 47 CFR 80.155 - Ship station operator requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Ship station operator requirements. 80.155... SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements Ship Station Operator Requirements § 80.155 Ship station operator requirements. Except as provided in §§ 80.177 and 80.179, operation of...

  9. 47 CFR 80.155 - Ship station operator requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Ship station operator requirements. 80.155... SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements Ship Station Operator Requirements § 80.155 Ship station operator requirements. Except as provided in §§ 80.177 and 80.179, operation of...

  10. 47 CFR 80.155 - Ship station operator requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Ship station operator requirements. 80.155... SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements Ship Station Operator Requirements § 80.155 Ship station operator requirements. Except as provided in §§ 80.177 and 80.179, operation of...

  11. 47 CFR 80.155 - Ship station operator requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Ship station operator requirements. 80.155... SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements Ship Station Operator Requirements § 80.155 Ship station operator requirements. Except as provided in §§ 80.177 and 80.179, operation of...

  12. 47 CFR 80.155 - Ship station operator requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Ship station operator requirements. 80.155... SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements Ship Station Operator Requirements § 80.155 Ship station operator requirements. Except as provided in §§ 80.177 and 80.179, operation of...

  13. 47 CFR 25.172 - Requirements for reporting space station control arrangements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... case of a non-U.S.-licensed space station, prior to commencing operation with U.S. earth stations. (1... earth station(s) communicating with the space station from any site in the United States. (3) The location, by city and country, of any telemetry, tracking, and command earth station that communicates with...

  14. 47 CFR 25.135 - Licensing provisions for earth station networks in the non-voice, non-geostationary Mobile...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Applications and Licenses Earth Stations § 25.135 Licensing provisions for earth station networks in the non... 47 Telecommunication 2 2014-10-01 2014-10-01 false Licensing provisions for earth station networks in the non-voice, non-geostationary Mobile-Satellite Service. 25.135 Section 25.135 Telecommunication...

  15. Russian-Cuban Colocation Station for Radio Astronomical Observation and Monitoring of Near-Earth Space

    NASA Astrophysics Data System (ADS)

    Ivanov, D. V.; Uratsuka, M.-R.; Ipatov, A. V.; Marshalov, D. A.; Shuygina, N. V.; Vasilyev, M. V.; Gayazov, I. S.; Ilyin, G. N.; Bondarenko, Yu. S.; Melnikov, A. E.; Suvorkin, V. V.

    2018-04-01

    The article presents the main possibilities of using the projected Russian-Cuban geodynamic colocation station on the basis of the Institute of Geophysics and Astronomy of the Ministry of Science, Technology and the Environment of the Republic of Cuba to carry out radio observations and monitoring the near-Earth space. Potential capabilities of the station are considered for providing various observational programs: astrophysical observations; observations by space geodesy methods using radio very long baselines interferometers, global navigation satellite systems, laser rangers, and various Doppler systems, as well as monitoring of artificial and natural bodies in the near-Earth and deep space, including the ranging of asteroids approaching the Earth. The results of modeling the observations on the planned station are compared with that obtained on the existing geodynamic stations. The efficiency of the projected Russian-Cuban station for solving astronomical tasks is considered.

  16. 46 CFR 177.1030 - Operating station visibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TONS) CONSTRUCTION AND ARRANGEMENT Window Construction and Visibility § 177.1030 Operating station visibility. (a) Windows and other openings at the operating station must be of sufficient size and properly... glazing material used in windows at the operating station must have a light transmission of not less than...

  17. Observations of Earth space by self-powered stations in Antarctica.

    PubMed

    Mende, S B; Rachelson, W; Sterling, R; Frey, H U; Harris, S E; McBride, S; Rosenberg, T J; Detrick, D; Doolittle, J L; Engebretson, M; Inan, U; Labelle, J W; Lanzerotti, L J; Weatherwax, A T

    2009-12-01

    Coupling of the solar wind to the Earth magnetosphere/ionosphere is primarily through the high latitude regions, and there are distinct advantages in making remote sensing observations of these regions with a network of ground-based observatories over other techniques. The Antarctic continent is ideally situated for such a network, especially for optical studies, because the larger offset between geographic and geomagnetic poles in the south enables optical observations at a larger range of magnetic latitudes during the winter darkness. The greatest challenge for such ground-based observations is the generation of power and heat for a sizable ground station that can accommodate an optical imaging instrument. Under the sponsorship of the National Science Foundation, we have developed suitable automatic observing platforms, the Automatic Geophysical Observatories (AGOs) for a network of six autonomous stations on the Antarctic plateau. Each station housed a suite of science instruments including a dual wavelength intensified all-sky camera that records the auroral activity, an imaging riometer, fluxgate and search-coil magnetometers, and ELF/VLF and LM/MF/HF receivers. Originally these stations were powered by propane fuelled thermoelectric generators with the fuel delivered to the site each Antarctic summer. A by-product of this power generation was a large amount of useful heat, which was applied to maintain the operating temperature of the electronics in the stations. Although a reasonable degree of reliability was achieved with these stations, the high cost of the fuel air lift and some remaining technical issues necessitated the development of a different type of power unit. In the second phase of the project we have developed a power generation system using renewable energy that can operate automatically in the Antarctic winter. The most reliable power system consists of a type of wind turbine using a simple permanent magnet rotor and a new type of power

  18. Observations of Earth space by self-powered stations in Antarctica

    NASA Astrophysics Data System (ADS)

    Mende, S. B.; Rachelson, W.; Sterling, R.; Frey, H. U.; Harris, S. E.; McBride, S.; Rosenberg, T. J.; Detrick, D.; Doolittle, J. L.; Engebretson, M.; Inan, U.; Labelle, J. W.; Lanzerotti, L. J.; Weatherwax, A. T.

    2009-12-01

    Coupling of the solar wind to the Earth magnetosphere/ionosphere is primarily through the high latitude regions, and there are distinct advantages in making remote sensing observations of these regions with a network of ground-based observatories over other techniques. The Antarctic continent is ideally situated for such a network, especially for optical studies, because the larger offset between geographic and geomagnetic poles in the south enables optical observations at a larger range of magnetic latitudes during the winter darkness. The greatest challenge for such ground-based observations is the generation of power and heat for a sizable ground station that can accommodate an optical imaging instrument. Under the sponsorship of the National Science Foundation, we have developed suitable automatic observing platforms, the Automatic Geophysical Observatories (AGOs) for a network of six autonomous stations on the Antarctic plateau. Each station housed a suite of science instruments including a dual wavelength intensified all-sky camera that records the auroral activity, an imaging riometer, fluxgate and search-coil magnetometers, and ELF/VLF and LM/MF/HF receivers. Originally these stations were powered by propane fuelled thermoelectric generators with the fuel delivered to the site each Antarctic summer. A by-product of this power generation was a large amount of useful heat, which was applied to maintain the operating temperature of the electronics in the stations. Although a reasonable degree of reliability was achieved with these stations, the high cost of the fuel air lift and some remaining technical issues necessitated the development of a different type of power unit. In the second phase of the project we have developed a power generation system using renewable energy that can operate automatically in the Antarctic winter. The most reliable power system consists of a type of wind turbine using a simple permanent magnet rotor and a new type of power

  19. Research on station management in subway operation safety

    NASA Astrophysics Data System (ADS)

    Li, Yiman

    2017-10-01

    The management of subway station is an important part of the safe operation of urban subway. In order to ensure the safety of subway operation, it is necessary to study the relevant factors that affect station management. In the protection of subway safety operations on the basis of improving the quality of service, to promote the sustained and healthy development of subway stations. This paper discusses the influencing factors of subway operation accident and station management, and analyzes the specific contents of station management security for subway operation, and develops effective suppression measures. It is desirable to improve the operational quality and safety factor for subway operations.

  20. Sally Ride EarthKAM: 15 Years of STEM Education and Outreach from Aboard the International Space Station

    NASA Astrophysics Data System (ADS)

    Finley, T.; Griffin, R.; Klug, T.; Harbour, S.; Au, B.; Graves, S. J.

    2016-12-01

    Sally Ride EarthKAM @ Space Camp is a digital camera payload on board the International Space Station (ISS) that allows students from around the globe to request photos of the Earth from space. Since its launch to the ISS in 2001, approximately 110,000 images have been requested by students from over 90 countries. EarthKAM provides the ultimate platform for STEM engagement in both formal and informal educational settings, as it is currently the only earth observation science payload on station completely controlled by students. Images are requested and accessed through a web portal and can be used by educators in a multitude of ways to promote interest in geosciences, math, physics, and numerous other fields. EarthKAM is currently operated out of the US Space and Rocket Center in Huntsville, Alabama and is incorporated into many Space Camp programs. Space Camp hosts nearly 25,000 students and 500 educators each year, vastly improving EarthKAM exposure. Future concepts currently in development include the ability to collect new data products such as night-time and near-infrared imagery, additional science curricula in the form of focused lesson plans and image applications, and a redesigned graphical user interface for requesting photos. The EarthKAM project, a NASA educational outreach program, is currently managed by the US Space and Rocket Center, the University of Alabama in Huntsville, and Teledyne Brown Engineering, Inc.

  1. Photovoltaic power system for satellite Earth stations in remote areas: Project status and design description

    NASA Technical Reports Server (NTRS)

    Delombard, R.

    1984-01-01

    A photovoltaic power system which will be installed at a remote location in Indonesia to provide power for a satellite Earth station and a classroom for video and audio teleconferences are described. The Earth station may also provide telephone service to a nearby village. The use of satellite communications for development assistance applications and the suitability of a hybrid photovoltaic engine generator power system for remote satellite Earth stations are demonstrated. The Indonesian rural satellite project is discussed and the photovoltaic power system is described.

  2. View of Skylab space station cluster in Earth orbit from CSM

    NASA Image and Video Library

    1974-02-08

    SL4-143-4707 (8 Feb. 1974) --- An overhead view of the Skylab space station cluster in Earth orbit as photographed from the Skylab 4 Command and Service Modules (CSM) during the final fly-around by the CSM before returning home. The space station is contrasted against a cloud-covered Earth. Note the solar shield which was deployed by the second crew of Skylab and from which a micrometeoroid shield has been missing since the cluster was launched on May 14, 1973. The OWS solar panel on the left side was also lost on workshop launch day. Photo credit: NASA

  3. Concept of operations for virtual weigh station

    DOT National Transportation Integrated Search

    2009-06-01

    This document describes the concept of operations (ConOps) for the virtual weigh station (VWS). The ConOps describes the goals, functions, key concepts, architecture, operational scenarios, operational policies, and impacts of virtual weigh stations....

  4. 30 CFR 57.14103 - Operators' stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Equipment Safety Devices and Maintenance Requirements § 57.14103 Operators' stations. (a) If windows are provided on operators' stations of self-propelled mobile equipment, the windows shall be made of safety glass or material with equivalent safety characteristics. The windows shall be maintained to provide...

  5. 47 CFR 25.223 - Alternative licensing rules for feeder-link earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... earth stations in the 17/24 GHz BSS. 25.223 Section 25.223 Telecommunication FEDERAL COMMUNICATIONS... Alternative licensing rules for feeder-link earth stations in the 17/24 GHz BSS. (a) This section applies to license applications for earth stations that transmit to 17/24 GHz Broadcasting-Satellite Service space...

  6. Space station operations task force summary report

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A companion to the Space Stations Operation Task Force Panels' Reports, this document summarizes all space station program goals, operations, and the characteristics of the expected user community. Strategies for operation and recommendations for implementation are included.

  7. 30 CFR 56.14103 - Operators stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Safety Devices and Maintenance Requirements § 56.14103 Operators stations. (a) If windows are provided on operators' stations of self-propelled mobile equipment, the windows shall be made of safety glass or material with equivalent safety characteristics. The windows shall be maintained to provide visibility for...

  8. 47 CFR 80.80 - Operating controls for ship stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operating controls for ship stations. 80.80... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Ship Stations § 80.80 Operating controls for ship stations. (a) Each control point must be capable of: (1...

  9. 47 CFR 80.80 - Operating controls for ship stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Operating controls for ship stations. 80.80... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Ship Stations § 80.80 Operating controls for ship stations. (a) Each control point must be capable of: (1...

  10. 47 CFR 80.80 - Operating controls for ship stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Operating controls for ship stations. 80.80... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Ship Stations § 80.80 Operating controls for ship stations. (a) Each control point must be capable of: (1...

  11. 47 CFR 80.80 - Operating controls for ship stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Operating controls for ship stations. 80.80... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Ship Stations § 80.80 Operating controls for ship stations. (a) Each control point must be capable of: (1...

  12. Space Station Program implications from the viewpoint of the Space Station Operations Task Force

    NASA Technical Reports Server (NTRS)

    Paules, Granville E.; Lyman, Peter; Shelley, Carl B.

    1987-01-01

    An operational concept for the Space Station which has been developed by the Space Station Operations Task Force is described. The operations functions are described, and the relationships of these functions to the overall framework for operations are defined. Product flows for the recommended framework are discussed, and the roles and responsibilities for the proposed operations organization during both the development and the mature operations phases of the Space Station Program are examined.

  13. Intelsat's small earth stations - Impact on the developing world

    NASA Astrophysics Data System (ADS)

    McDougal, Patrick

    1986-12-01

    This article offers a brief historical look at the progress in the use of small earth stations in the developing world, and a present status report on Intelsat's new service offerings, especially in the use of smaller earth station technology. Three experiments or series of experiments are discussed: those conducted on NASA's ATS (Applications Technology Satellite) series of satellites, India's SITE (Satellite Instructional Television Experiment), and the Rural Satellite Project sponsored by the U.S. Agency for International Development. Intelsat's contributions to the growth of telecommunications in the developing world include: domestic leases, VISTA and INTELNET services, Project SHARE, and some new strategies for the financing of telecommunications projects. The article concludes that it is only recently that some of the true benefits of satellite communications have been realized in the developing countries because of improvements in technology, reduction in costs, and diversity of service offerings.

  14. Crew Earth Observations: Twelve Years of Documenting Earth from the International Space Station

    NASA Technical Reports Server (NTRS)

    Evans, Cynthia A.; Stefanov, William L.; Willis, Kimberley; Runco, Susan; Wilkinson, M. Justin; Dawson, Melissa; Trenchard, Michael

    2012-01-01

    The Crew Earth Observations (CEO) payload was one of the initial experiments aboard the International Space Station, and has been continuously collecting data about the Earth since Expedition 1. The design of the experiment is simple: using state-of-the-art camera equipment, astronauts collect imagery of the Earth's surface over defined regions of scientific interest and also document dynamic events such as storms systems, floods, wild fires and volcanic eruptions. To date, CEO has provided roughly 600,000 images of Earth, capturing views of features and processes on land, the oceans, and the atmosphere. CEO data are less rigorously constrained than other remote sensing data, but the volume of data, and the unique attributes of the imagery provide a rich and understandable view of the Earth that is difficult to achieve from the classic remote sensing platforms. In addition, the length-of-record of the imagery dataset, especially when combined with astronaut photography from other NASA and Russian missions starting in the early 1960s, provides a valuable record of changes on the surface of the Earth over 50 years. This time period coincides with the rapid growth of human settlements and human infrastructure.

  15. A distributed planning concept for Space Station payload operations

    NASA Technical Reports Server (NTRS)

    Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey

    1994-01-01

    The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

  16. 46 CFR 116.1030 - Operating station visibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ARRANGEMENT Window Construction and Visibility § 116.1030 Operating station visibility. (a) Windows and other... windows at the operating station must have a light transmission of not less than 70 percent according to...

  17. 47 CFR 80.71 - Operating controls for stations on land.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operating controls for stations on land. 80.71... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Land Stations § 80.71 Operating controls for stations on land. Each coast station, Alaska-public fixed station...

  18. 47 CFR 25.250 - Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Sharing between NGSO MSS Feeder links Earth....250 Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands. (a) NGSO MSS applicants shall be licensed to operate in the 29.1-29.5 GHz band for Earth-to-space...

  19. 47 CFR 25.250 - Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Sharing between NGSO MSS Feeder links Earth....250 Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands. (a) NGSO MSS applicants shall be licensed to operate in the 29.1-29.5 GHz band for Earth-to-space...

  20. 47 CFR 25.250 - Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Sharing between NGSO MSS Feeder links Earth....250 Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands. (a) NGSO MSS applicants shall be licensed to operate in the 29.1-29.5 GHz band for Earth-to-space...

  1. 47 CFR 25.250 - Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Sharing between NGSO MSS Feeder links Earth....250 Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands. (a) NGSO MSS applicants shall be licensed to operate in the 29.1-29.5 GHz band for Earth-to-space...

  2. 47 CFR 25.250 - Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Sharing between NGSO MSS Feeder links Earth....250 Sharing between NGSO MSS Feeder links Earth Stations in the 19.3-19.7 GHz and 29.1-29.5 GHz Bands. (a) NGSO MSS applicants shall be licensed to operate in the 29.1-29.5 GHz band for Earth-to-space...

  3. 47 CFR 25.258 - Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25-29.5 GHz Bands.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (a) Operators of NGSO MSS feeder link earth stations and GSO FSS earth stations in the band 29.25 to... MSS feeder link earth station complexes, that will minimize instances of unacceptable interference to the GSO FSS space stations. Earth station licensees operating with GSO FSS systems shall be capable of...

  4. 47 CFR 25.258 - Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25-29.5 GHz Bands.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (a) Operators of NGSO MSS feeder link earth stations and GSO FSS earth stations in the band 29.25 to... MSS feeder link earth station complexes, that will minimize instances of unacceptable interference to the GSO FSS space stations. Earth station licensees operating with GSO FSS systems shall be capable of...

  5. 47 CFR 25.258 - Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25-29.5 GHz Bands.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (a) Operators of NGSO MSS feeder link earth stations and GSO FSS earth stations in the band 29.25 to... MSS feeder link earth station complexes, that will minimize instances of unacceptable interference to the GSO FSS space stations. Earth station licensees operating with GSO FSS systems shall be capable of...

  6. 47 CFR 25.258 - Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25-29.5 GHz Bands.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (a) Operators of NGSO MSS feeder link earth stations and GSO FSS earth stations in the band 29.25 to... MSS feeder link earth station complexes, that will minimize instances of unacceptable interference to the GSO FSS space stations. Earth station licensees operating with GSO FSS systems shall be capable of...

  7. 47 CFR 25.258 - Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25-29.5 GHz Bands.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (a) Operators of NGSO MSS feeder link earth stations and GSO FSS earth stations in the band 29.25 to... MSS feeder link earth station complexes, that will minimize instances of unacceptable interference to the GSO FSS space stations. Earth station licensees operating with GSO FSS systems shall be capable of...

  8. Real-Time Operation of the International Space Station

    NASA Astrophysics Data System (ADS)

    Suffredini, M. T.

    2002-01-01

    The International Space Station is on orbit and real-time operations are well underway. Along with the assembly challenges of building and operating the International Space Station , scientific activities are also underway. Flight control teams in three countries are working together as a team to plan, coordinate and command the systems on the International Space Station.Preparations are being made to add the additional International Partner elements including their operations teams and facilities. By October 2002, six Expedition crews will have lived on the International Space Station. Management of real-time operations has been key to these achievements. This includes the activities of ground teams in control centers around the world as well as the crew on orbit. Real-time planning is constantly challenged with balancing the requirements and setting the priorities for the assembly, maintenance, science and crew health functions on the International Space Station. It requires integrating the Shuttle, Soyuz and Progress requirements with the Station. It is also necessary to be able to respond in case of on-orbit anomalies and to set plans and commands in place to ensure the continues safe operation of the Station. Bringing together the International Partner operations teams has been challenging and intensely rewarding. Utilization of the assets of each partner has resulted in efficient solutions to problems. This paper will describe the management of the major real-time operations processes, significant achievements, and future challenges.

  9. Centaur operations at the space station

    NASA Technical Reports Server (NTRS)

    Porter, J.; Thompson, W.; Bennett, F.; Holdridge, J.

    1987-01-01

    A study was conducted on the feasibility of using a Centaur vehicle as a testbed to demonstrate critical OTV technologies at the Space Station. Two Technology Demonstration Missions (TDMs) were identified: (1) Accommodations, and (2) Operations. The Accommodations TDM contained: (1) berthing, (2) checkout, maintenance and safing, and (3) payload integration missions. The Operations TDM contained: (1) a cryogenic propellant resupply mission, and (2) Centaur deployment activities. A modified Space Station Co-Orbiting Platform (COP) was selected as the optimum refueling and launch node due to safety and operational considerations. After completion of the TDMs, the fueled Centaur would carry out a mission to actually test deployment and help offset TDM costs. From the Station, the Centaur could carry a single payload in excess of 20,000 pounds to geosynchronous orbit or multiple payloads.

  10. Earth Observation taken during Joint Operations

    NASA Image and Video Library

    2009-07-23

    S127-E-008040 (23 July 2009) --- This is a view of Egypt's Lake Nasser from the shuttle-station tandem currently flying 220 miles above Earth. An international crew of thirteen astronauts and cosmonaut are working together to continue work on the orbital outpost

  11. 75 FR 7975 - Procedures to Govern the Use of Satellite Earth Stations on Board Vessels in the 5925-6425 MHz...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Govern the Use of Satellite Earth Stations on Board Vessels in the 5925-6425 MHz/3700-4200 MHz Bands and... on Reconsideration, In the Matter of Procedures to Govern the Use of Satellite Earth Stations on...: December 31, 2012. Title: Earth Stations on Board Vessels (ESV). Form No.: Not applicable. Type of Review...

  12. Satellite tracking and earth dynamics research programs

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The SAO laser site in Arequipa continued routine operations throughout the reporting period except for the months of March and April when upgrading was underway. The laser in Orroral Valley was operational through March. Together with the cooperating stations in Wettzell, Grasse, Kootwikj, San Fernando, Helwan, and Metsahove the laser stations obtained a total of 37,099 quick-look observations on 978 passes of BE-C, Starlette, and LAGEOS. The Network continued to track LAGEOS at highest priority for polar motion and Earth rotation studies, and for other geophysical investigations, including crustal dynamics, Earth and ocean tides, and the general development of precision orbit determination. The Network performed regular tracking of BE-C and Starlette for refined determinations of station coordinate and the Earth's gravity field and for studies of solid earth dynamics. Monthly statistics of the passes and points are given by station and by satellite.

  13. 47 CFR 25.138 - Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19.7-20.2 GHz (space-to-Earth), 28.35-28.6 GHz (Earth-to-space), and 29.25-30.0 GHz (Earth-to-space) bands. 25.138 Section 25.138 Telecommunication FEDERAL...

  14. 47 CFR 25.138 - Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19.7-20.2 GHz (space-to-Earth), 28.35-28.6 GHz (Earth-to-space), and 29.25-30.0 GHz (Earth-to-space) bands. 25.138 Section 25.138 Telecommunication FEDERAL...

  15. 47 CFR 25.138 - Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19.7-20.2 GHz (space-to-Earth), 28.35-28.6 GHz (Earth-to-space), and 29.25-30.0 GHz (Earth-to-space) bands. 25.138 Section 25.138 Telecommunication FEDERAL...

  16. 47 CFR 25.138 - Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19.7-20.2 GHz (space-to-Earth), 28.35-28.6 GHz (Earth-to-space), and 29.25-30.0 GHz (Earth-to-space) bands. 25.138 Section 25.138 Telecommunication FEDERAL...

  17. Computer programs for plotting spot-beam coverages from an earth synchronous satellite and earth-station antenna elevation angle contours

    NASA Technical Reports Server (NTRS)

    Stagl, T. W.; Singh, J. P.

    1972-01-01

    A description and listings of computer programs for plotting geographical and political features of the world or a specified portion of it, for plotting spot-beam coverages from an earth-synchronous satellite over the computer generated mass, and for plotting polar perspective views of the earth and earth-station antenna elevation contours for a given satellite location are presented. The programs have been prepared in connection with a project on Application of Communication Satellites to Educational Development.

  18. The Role of Anchor Stations in the Validation of Earth Observation Satellite Data and Products. The Valencia and the Alacant Anchor Stations

    NASA Astrophysics Data System (ADS)

    Lopez-Baeza, Ernesto; Geraldo Ferreira, A.; Saleh-Contell, Kauzar

    Space technology facilitates humanity and science with a global revolutionary view of the Earth through the acquisition of Earth Observation satellite data. Satellites capture information over different spatial and temporal scales and assist in understanding natural climate processes and in detecting and explaining climate change. Accurate Earth Observation data is needed to describe climate processes by improving the parameterisations of different climate elements. Algorithms to produce geophysical parameters from raw satellite observations should go through selection processes or participate in inter-comparison programmes to ensure performance reliability. Geophysical parameter datasets, obtained from satellite observations, should pass a quality control before they are accepted in global databases for impact, diagnostic or sensitivity studies. Calibration and Validation, or simply "Cal/Val", is the activity that endeavours to ensure that remote sensing products are highly consistent and reproducible. This is an evolving scientific activity that is becoming increasingly important as more long-term studies on global change are undertaken, and new satellite missions are launched. Calibration is the process of quantitatively defining the system responses to known, controlled signal inputs. Validation refers to the process of assessing, by independent means, the quality of the data products derived from the system outputs. These definitions are generally accepted and most often used in the remote sensing context to refer specifically and respectively to sensor radiometric calibration and geophysical parameter validation. Anchor Stations are carefully selected locations at which instruments measure quantities that are needed to run, calibrate or validate models and algorithms. These are needed to quanti-tatively evaluate satellite data and convert it into geophysical information. The instruments collect measurements of basic quantities over a long timescale

  19. 78 FR 19172 - Earth Stations Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 2 and 25 [IB Docket No. 12-376; FCC 12-161] Earth Stations Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit Space Stations AGENCY: Federal Communications Commission. ACTION: Proposed rule; correction. SUMMARY: The Federal...

  20. 47 CFR 25.223 - Off-axis EIRP spectral density limits for feeder link earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... feeder link earth stations in the 17/24 GHz BSS. 25.223 Section 25.223 Telecommunication FEDERAL....223 Off-axis EIRP spectral density limits for feeder link earth stations in the 17/24 GHz BSS. (a) This section applies to all applications for earth station licenses in the 17/24 GHz BSS frequency...

  1. 47 CFR 25.223 - Off-axis EIRP spectral density limits for feeder link earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... feeder link earth stations in the 17/24 GHz BSS. 25.223 Section 25.223 Telecommunication FEDERAL....223 Off-axis EIRP spectral density limits for feeder link earth stations in the 17/24 GHz BSS. (a) This section applies to all applications for earth station licenses in the 17/24 GHz BSS frequency...

  2. 47 CFR 25.223 - Off-axis EIRP spectral density limits for feeder link earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... feeder link earth stations in the 17/24 GHz BSS. 25.223 Section 25.223 Telecommunication FEDERAL....223 Off-axis EIRP spectral density limits for feeder link earth stations in the 17/24 GHz BSS. (a) This section applies to all applications for earth station licenses in the 17/24 GHz BSS frequency...

  3. 47 CFR 25.223 - Off-axis EIRP spectral density limits for feeder link earth stations in the 17/24 GHz BSS.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... feeder link earth stations in the 17/24 GHz BSS. 25.223 Section 25.223 Telecommunication FEDERAL....223 Off-axis EIRP spectral density limits for feeder link earth stations in the 17/24 GHz BSS. (a) This section applies to all applications for earth station licenses in the 17/24 GHz BSS frequency...

  4. 47 CFR 25.135 - Licensing provisions for earth station networks in the non-voice, non-geostationary mobile...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Applications and Licenses Earth Stations § 25.135 Licensing provisions for earth station networks in the non... systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license or...

  5. 47 CFR 25.135 - Licensing provisions for earth station networks in the non-voice, non-geostationary mobile...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Applications and Licenses Earth Stations § 25.135 Licensing provisions for earth station networks in the non... systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license or...

  6. 47 CFR 25.135 - Licensing provisions for earth station networks in the non-voice, non-geostationary mobile...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Applications and Licenses Earth Stations § 25.135 Licensing provisions for earth station networks in the non... systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license or...

  7. 47 CFR 25.135 - Licensing provisions for earth station networks in the non-voice, non-geostationary mobile...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Applications and Licenses Earth Stations § 25.135 Licensing provisions for earth station networks in the non... systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license or...

  8. 47 CFR 5.81 - Discontinuance of station operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THAN BROADCAST) Applications and Licenses § 5.81 Discontinuance of station operation. In case of... mobile station in the Experimental Radio Service, the licensee shall forward the station license to the...

  9. 47 CFR 80.116 - Radiotelephone operating procedures for ship stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Radiotelephone operating procedures for ship... Procedures-Ship Stations § 80.116 Radiotelephone operating procedures for ship stations. (a) Calling coast stations. (1) Use by ship stations of the frequency 2182 kHz for calling coast stations and for replying to...

  10. 47 CFR 80.116 - Radiotelephone operating procedures for ship stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Radiotelephone operating procedures for ship... Procedures-Ship Stations § 80.116 Radiotelephone operating procedures for ship stations. (a) Calling coast stations. (1) Use by ship stations of the frequency 2182 kHz for calling coast stations and for replying to...

  11. 47 CFR 80.116 - Radiotelephone operating procedures for ship stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Radiotelephone operating procedures for ship... Procedures-Ship Stations § 80.116 Radiotelephone operating procedures for ship stations. (a) Calling coast stations. (1) Use by ship stations of the frequency 2182 kHz for calling coast stations and for replying to...

  12. 47 CFR 80.116 - Radiotelephone operating procedures for ship stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Radiotelephone operating procedures for ship... Procedures-Ship Stations § 80.116 Radiotelephone operating procedures for ship stations. (a) Calling coast stations. (1) Use by ship stations of the frequency 2182 kHz for calling coast stations and for replying to...

  13. 47 CFR 80.116 - Radiotelephone operating procedures for ship stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Radiotelephone operating procedures for ship... Procedures-Ship Stations § 80.116 Radiotelephone operating procedures for ship stations. (a) Calling coast stations. (1) Use by ship stations of the frequency 2182 kHz for calling coast stations and for replying to...

  14. Earth orbital operations supporting manned interplanetary missions

    NASA Astrophysics Data System (ADS)

    Sherwood, Brent; Buddington, Patricia A.; Whittaker, William L.

    The orbital operations required to accumulate, assemble, test, verify, maintain, and launch complex manned space systems on interplanetary missions from earth orbit are as vital as the flight hardware itself. Vast numbers of orbital crew are neither necessary nor desirable for accomplishing the required tasks. A suite of robotic techniques under human supervisory control, relying on sensors, software and manipulators either currently emergent or already applied in terrestrial settings, can make the job tractable. The mission vehicle becomes largely self-assembling, using its own rigid aerobrake as a work platform. The Space Station, having been used as a laboratory testbed and to house an assembly crew of four, is not dominated by the process. A feasible development schedule, if begun soon, could emplace orbital support technologies for exploration missions in time for a 2004 first interplanetary launch.

  15. Earth orbital operations supporting manned interplanetary missions

    NASA Technical Reports Server (NTRS)

    Sherwood, Brent; Buddington, Patricia A.; Whittaker, William L.

    1989-01-01

    The orbital operations required to accumulate, assemble, test, verify, maintain, and launch complex manned space systems on interplanetary missions from earth orbit are as vital as the flight hardware itself. Vast numbers of orbital crew are neither necessary nor desirable for accomplishing the required tasks. A suite of robotic techniques under human supervisory control, relying on sensors, software and manipulators either currently emergent or already applied in terrestrial settings, can make the job tractable. The mission vehicle becomes largely self-assembling, using its own rigid aerobrake as a work platform. The Space Station, having been used as a laboratory testbed and to house an assembly crew of four, is not dominated by the process. A feasible development schedule, if begun soon, could emplace orbital support technologies for exploration missions in time for a 2004 first interplanetary launch.

  16. Space Station tethered refueling facility operations

    NASA Technical Reports Server (NTRS)

    Kiefel, E. R.; Rudolph, L. K.; Fester, D. A.

    1986-01-01

    The space-based orbital transfer vehicle will require a large cryogenic fuel storage facility at the Space Station. An alternative to fuel storage onboard the Space Station, is on a tethered orbital refueling facility (TORF) which is separated from the Space Station by a sufficient distance to induce a gravity gradient to settle the propellants. Facility operations are a major concern associated with a tethered LO2/LH2 storage depot. A study was carried out to analyze these operations so as to identify the preferred TORF deployment direction (up or down) and whether the TORF should be permanently or intermittently deployed. The analyses considered safety, contamination, rendezvous, servicing, transportation rate, communication, and viewing. An upwardly, intermittently deployed facility is the preferred configuration for a tethered cryogenic fuel storage.

  17. 47 CFR 25.138 - Licensing requirements for GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19.7-20...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Licensing requirements for GSO FSS Earth Stations in the 18.3-18.8 GHz (space-to-Earth), 19.7-20.2 GHz (space-to-Earth), 28.35-28.6 GHz (Earth-to-space), and 29.25-30.0 GHz (Earth-to-space) bands. 25.138 Section 25.138 Telecommunication FEDERAL...

  18. Practical Applications of a Space Station

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The potential uses of a special station for civil and commercial applications is examined. Five panels of experts representing user-oriented communities, and a sixth panel which dealth with system design considerations, based their studies on the assumption that the station would be a large platform, capable of housing a wide array of diverse instruments, and could be either manned or unmanned. The Earth's Resources Panel dealt with applications of remote sensing for resource assessment. The Earth's Environment Panel dealt with the Earth's atmosphere and its impact on society. The Ocean Operations Panel looked at both science and applications. The Satellite Communications Panel assessed the potential role of a space station in the evolution of commercial telecommunication services up to the year 2000. The Materials Science and Engineering panel focused on the utility of a space station environment for materials processing.

  19. Amateur Radio on the International Space Station - the First Operational Payload on the ISS

    NASA Astrophysics Data System (ADS)

    Bauer, F. H.; McFadin, L.; Steiner, M.; Conley, C. L.

    2002-01-01

    As astronauts and cosmonauts have adapted to life on the International Space Station (ISS), they have found Amateur Radio and its connection to life on Earth to be a constant companion and a substantial psychological boost. Since its first use in November 2000, the first five expedition crews have utilized the amateur radio station in the FGB to talk to thousands of students in schools, to their families on Earth, and to amateur radio operators around the world. Early in the development of ISS, an international organization called ARISS (Amateur Radio on the International Space Station) was formed to coordinate the construction and operation of amateur radio (ham radio) equipment on ISS. ARISS represents a melding of the volunteer teams that have pioneered the development and use of amateur radio equipment on human spaceflight vehicles. The Shuttle/Space Amateur Radio Experiment (SAREX) team enabled Owen Garriott to become the first astronaut ham to use amateur radio from space in 1983. Since then, amateur radio teams in the U.S. (SAREX), Germany, (SAFEX), and Russia (Mirex) have led the development and operation of amateur radio equipment on board NASA's Space Shuttle, Russia's Mir space station, and the International Space Station. The primary goals of the ARISS program are fourfold: 1) educational outreach through crew contacts with schools, 2) random contacts with the Amateur Radio public, 3) scheduled contacts with the astronauts' friends and families and 4) ISS-based communications experimentation. To date, over 65 schools have been selected from around the world for scheduled contacts with the orbiting ISS crew. Ten or more students at each school ask the astronauts questions, and the nature of these contacts embodies the primary goal of the ARISS program, -- to excite student's interest in science, technology and amateur radio. The ARISS team has developed various hardware elements for the ISS amateur radio station. These hardware elements have flown to ISS

  20. View of Skylab space station cluster in Earth orbit from CSM

    NASA Image and Video Library

    2008-08-18

    SL4-143-4706 (8 Feb. 1974) --- An overhead view of the Skylab space station cluster in Earth orbit as photographed from the Skylab 4 Command and Service Modules (CSM) during the final fly-around by the CSM before returning home. The space station is contrasted against a cloud-covered Earth. Note the solar shield which was deployed by the second crew of Skylab and from which a micro meteoroid shield has been missing since the cluster was launched on May 14, 1973. The Orbital Workshop (OWS) solar panel on the left side was also lost on workshop launch day. Inside the Command Module (CM) when this picture was made were astronaut Gerald P. Carr, commander; scientist-astronaut Edward G. Gibson, science pilot; and astronaut William R. Pogue, pilot. The crew used a 70mm hand-held Hasselblad camera to take this photograph. Photo credit: NASA

  1. Space Station - An integrated approach to operational logistics support

    NASA Technical Reports Server (NTRS)

    Hosmer, G. J.

    1986-01-01

    Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.

  2. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each initial license for an earth... the earth station must be completed and the station must be brought into operation within 12 months...

  3. Glenn's Telescience Support Center Provided Around-the-Clock Operations Support for Space Experiments on the International Space Station

    NASA Technical Reports Server (NTRS)

    Malarik, Diane C.

    2005-01-01

    NASA Glenn Research Center s Telescience Support Center (TSC) allows researchers on Earth to operate experiments onboard the International Space Station (ISS) and the space shuttles. NASA s continuing investment in the required software, systems, and networks provides distributed ISS ground operations that enable payload developers and scientists to monitor and control their experiments from the Glenn TSC. The quality of scientific and engineering data is enhanced while the long-term operational costs of experiments are reduced because principal investigators and engineering teams can operate their payloads from their home institutions.

  4. Space station operating system study

    NASA Technical Reports Server (NTRS)

    Horn, Albert E.; Harwell, Morris C.

    1988-01-01

    The current phase of the Space Station Operating System study is based on the analysis, evaluation, and comparison of the operating systems implemented on the computer systems and workstations in the software development laboratory. Primary emphasis has been placed on the DEC MicroVMS operating system as implemented on the MicroVax II computer, with comparative analysis of the SUN UNIX system on the SUN 3/260 workstation computer, and to a limited extent, the IBM PC/AT microcomputer running PC-DOS. Some benchmark development and testing was also done for the Motorola MC68010 (VM03 system) before the system was taken from the laboratory. These systems were studied with the objective of determining their capability to support Space Station software development requirements, specifically for multi-tasking and real-time applications. The methodology utilized consisted of development, execution, and analysis of benchmark programs and test software, and the experimentation and analysis of specific features of the system or compilers in the study.

  5. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2012-10-01 2012-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  6. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2013-10-01 2013-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  7. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2014-10-01 2014-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  8. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2010-10-01 2010-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  9. 47 CFR 74.765 - Posting of station and operator licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... station, together with the name, address, and telephone number of the licensee or local representative of... 47 Telecommunication 4 2011-10-01 2011-10-01 false Posting of station and operator licenses. 74... Power TV, TV Translator, and TV Booster Stations § 74.765 Posting of station and operator licenses. (a...

  10. Artist's concept of Skylab space station cluster in Earth's orbit

    NASA Image and Video Library

    1971-10-01

    S71-52192 (1971) --- An artist's concept of the Skylab space station cluster in Earth's orbit. The cutaway view shows astronaut activity in the Orbital Workshop (OWS). The Skylab cluster is composed of the OWS, Airlock Module (AM), Multiple Docking Adapter (MDA), Apollo Telescope Mount (ATM), and the Command and Service Module (CSM). Photo credit: NASA

  11. An operations management system for the Space Station

    NASA Astrophysics Data System (ADS)

    Savage, Terry R.

    A description is provided of an Operations Management System (OMS) for the planned NASA Space Station. The OMS would be distributed both in space and on the ground, and provide a transparent interface to the communications and data processing facilities of the Space Station Program. The allocation of OMS responsibilities has, in the most current Space Station design, been fragmented among the Communications and Tracking Subsystem (CTS), the Data Management System (DMS), and a redefined OMS. In this current view, OMS is less of a participant in the real-time processing, and more an overseer of the health and management of the Space Station operations.

  12. The role of the space station in earth science research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaye, Jack A.

    1999-01-22

    The International Space Station (ISS) has the potential to be a valuable platform for earth science research. By virtue of its being in a mid-inclination orbit (51.5 deg.), ISS provides the opportunity for nadir viewing of nearly 3/4 of the Earth's surface, and allows viewing to high latitudes if limb-emission or occultation viewing techniques are used. ISS also provides the opportunity for viewing the Earth under a range of lighting conditions, unlike the polar sun-synchronous satellites that are used for many earth observing programs. The ISS is expected to have ample power and data handling capability to support Earth-viewing instruments,more » provide opportunities for external mounting and retrieval of instruments, and be in place for a sufficiently long period that long-term data records can be obtained. On the other hand, there are several questions related to contamination, orbital variations, pointing knowledge and stability, and viewing that are of concern in consideration of ISS for earth science applications. The existence of an optical quality window (the Window Observational Research Facility, or WORF), also provides the opportunity for Earth observations from inside the pressurized part of ISS. Current plans by NASA for earth science research from ISS are built around the Stratospheric Aerosol and Gas Experiment (SAGE III) instrument, planned for launch in 2002.« less

  13. International Space Station Earth Observations Working Group

    NASA Technical Reports Server (NTRS)

    Stefanov, William L.; Oikawa, Koki

    2015-01-01

    The multilateral Earth Observations Working Group (EOWG) was chartered in May 2012 in order to improve coordination and collaboration of Earth observing payloads, research, and applications on the International Space Station (ISS). The EOWG derives its authority from the ISS Program Science Forum, and a NASA representative serves as a permanent co-chair. A rotating co-chair position can be occupied by any of the international partners, following concurrence by the other partners; a JAXA representative is the current co-chair. Primary functions of the EOWG include, 1) the exchange of information on plans for payloads, from science and application objectives to instrument development, data collection, distribution and research; 2) recognition and facilitation of opportunities for international collaboration in order to optimize benefits from different instruments; and 3) provide a formal ISS Program interface for collection and application of remotely sensed data collected in response to natural disasters through the International Charter, Space and Major Disasters. Recent examples of EOWG activities include coordination of bilateral data sharing protocols between NASA and TsNIIMash for use of crew time and instruments in support of ATV5 reentry imaging activities; discussion of continued use and support of the Nightpod camera mount system by NASA and ESA; and review and revision of international partner contributions on Earth observations to the ISS Program Benefits to Humanity publication.

  14. Earth Science Observations from the International Space Station: An Overview (Invited)

    NASA Astrophysics Data System (ADS)

    Kaye, J. A.

    2013-12-01

    The International Space Station (ISS) provides a unique and valuable platform for observing the Earth. With its mid-inclination (~51 degree) orbit, it provides the opportunity to view most of the Earth, with data acquisition possible over a full range of local times, in an orbit that nicely complements the polar sun-synchronous orbits used for much of space-based Earth observation, and can draw on a heritage of mid-inclination observations from both free flying satellites and the Space Shuttle program. The ISS, including its component observing modules supplied by NASA's international partners, can provide needed resources and viewing opportunities by a broad range of Earth-viewing scientific instruments. In this talk, the overall picture of Earth viewing from ISS will be presented, with examples from a range of past, current, and projected sensors being shared; talks on the ISS implementation for a subset of current and projected payload will be presented in individual talks presented by their their respective teams.

  15. Earth based approaches to enhancing the health and safety of space operations

    NASA Technical Reports Server (NTRS)

    Koller, A. M., Jr.

    1985-01-01

    This paper provides an overview of the current state of our earth based knowledge of space safety hazards; identification of several key areas of concern for space operations; and proposed approaches to providing technology enhancement and information needed to improve the health and safety to those conducting space operations. Included are a review of the identified hazards for space oeprations by hazard classification; a summarization of the information currently available on space experiences and an assessment of potential hazards for long duration spaceflight; a discussion of potential failure modes and their significance for Space Station work: and an assessment of current work which indicates additional research and experimentation which can only be accomplished in actual space missions.

  16. KSC ground operations planning for Space Station

    NASA Technical Reports Server (NTRS)

    Lyon, J. R.; Revesz, W., Jr.

    1993-01-01

    At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

  17. KSC Space Station Operations Language (SSOL)

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The Space Station Operations Language (SSOL) will serve a large community of diverse users dealing with the integration and checkout of Space Station modules. Kennedy Space Center's plan to achieve Level A specification of the SSOL system, encompassing both its language and its automated support environment, is presented in the format of a briefing. The SSOL concept is a collection of fundamental elements that span languages, operating systems, software development, software tools and several user classes. The approach outlines a thorough process that combines the benefits of rapid prototyping with a coordinated requirements gathering effort, yielding a Level A specification of the SSOL requirements.

  18. Operations Data Files, driving force behind International Space Station operations

    NASA Astrophysics Data System (ADS)

    Hoppenbrouwers, Tom; Ferra, Lionel; Markus, Michael; Wolff, Mikael

    2017-09-01

    Almost all tasks performed by the astronauts on-board the International Space Station (ISS) and by ground controllers in Mission Control Centre, from operation and maintenance of station systems to the execution of scientific experiments or high risk visiting vehicles docking manoeuvres, would not be possible without Operations Data Files (ODF). ODFs are the User Manuals of the Space Station and have multiple faces, going from traditional step-by-step procedures, scripts, cue cards, over displays, to software which guides the crew through the execution of certain tasks. Those key operational documents are standardized as they are used on-board the Space Station by an international crew constantly changing every 3 months. Furthermore this harmonization effort is paramount for consistency as the crew moves from one element to another in a matter of seconds, and from one activity to another. On ground, a significant large group of experts from all International Partners drafts, prepares reviews and approves on a daily basis all Operations Data Files, ensuring their timely availability on-board the ISS for all activities. Unavailability of these operational documents will halt the conduct of experiments or cancel milestone events. This paper will give an insight in the ground preparation work for the ODFs (with a focus on ESA ODF processes) and will present an overview on ODF formats and their usage within the ISS environment today and show how vital they are. Furthermore the focus will be on the recently implemented ODF features, which significantly ease the use of this documentation and improve the efficiency of the astronauts performing the tasks. Examples are short video demonstrations, interactive 3D animations, Execute Tailored Procedures (XTP-versions), tablet products, etc.

  19. Space Station overall management approach for operations

    NASA Technical Reports Server (NTRS)

    Paules, G.

    1986-01-01

    An Operations Management Concept developed by NASA for its Space Station Program is discussed. The operational goals, themes, and design principles established during program development are summarized. The major operations functions are described, including: space systems operations, user support operations, prelaunch/postlanding operations, logistics support operations, market research, and cost/financial management. Strategic, tactical, and execution levels of operational decision-making are defined.

  20. Modular space station, phase B extension. Program operations plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  1. 47 CFR 80.1073 - Radio operator requirements for ship stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Radio operator requirements for ship stations... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Global Maritime Distress and Safety System (GMDSS) General Provisions § 80.1073 Radio operator requirements for ship stations. (a) Ships must carry at least...

  2. International Space Station as a Base Camp for Exploration Beyond Low Earth Orbit

    NASA Technical Reports Server (NTRS)

    Raftery, Michael; Hoffman, Jeffrey

    2011-01-01

    The idea for using the International Space Station (ISS) as platform for exploration has matured in the past year and the concept continues to gain momentum. ISS provides a robust infrastructure which can be used to test systems and capabilities needed for missions to the Moon, Mars, asteroids and other potential destinations. International cooperation is a critical enabler and ISS has already demonstrated successful management of a large multi-national technical endeavor. Systems and resources needed for expeditions can be aggregated and thoroughly tested at ISS before departure thus providing wide operational flexibility and the best assurance of mission success. A small part of ISS called an Exploration Platform (ISS-EP) can be placed at Earth-Moon Libration point 1 (EML1) providing immediate benefits and flexibility for future exploration missions. We will show how ISS and the ISS-EP can be used to reduce risk and improve the operational flexibility for missions beyond low earth orbit. Life support systems and other technology developed for ISS can be evolved and adapted to the ISS-EP and other exploration spacecraft. New technology, such as electric propulsion and advanced life support systems can be tested and proven at ISS as part of an incremental development program. Commercial companies who are introducing transportation and other services will benefit with opportunities to contribute to the mission since ISS will serve as a focal point for the commercialization of low earth orbit services. Finally, we will show how use of ISS provides immediate benefits to the scientific community because its capabilities are available today and certain critical aspects of exploration missions can be simulated.

  3. Integrating International Space Station payload operations

    NASA Technical Reports Server (NTRS)

    Noneman, Steven R.

    1996-01-01

    The payload operations support for the International Space Station (ISS) payload is reported on, describing payload activity planning, payload operations control, payload data management and overall operations integration. The operations concept employed is based on the distribution of the payload operations responsibility between the researchers and ISS partners. The long duration nature of the ISS mission dictates the geographical distribution of the payload operations activities between the different national centers. The coordination and integration of these operations will be assured by NASA's Payload Operations Integration Center (POIC). The prime objective of the POIC is the achievement of unified operations through communication and collaboration.

  4. Orbiting Deep Space Relay Station (ODSRS). Volume 1: Requirement determination

    NASA Technical Reports Server (NTRS)

    Hunter, J. A.

    1979-01-01

    The deep space communications requirements of the post-1985 time frame are described and the orbiting deep space relay station (ODSRS) is presented as an option for meeting these requirements. Under current conditions, the ODSRS is not yet cost competitive with Earth based stations to increase DSN telemetry performance, but has significant advantages over a ground station, and these are sufficient to maintain it as a future option. These advantages include: the ability to track a spacecraft 24 hours per day with ground stations located only in the USA; the ability to operate at higher frequencies that would be attenuated by Earth's atmosphere; and the potential for building very large structures without the constraints of Earth's gravity.

  5. Service offerings and interfaces for the ACTS network of Earth stations

    NASA Technical Reports Server (NTRS)

    Coney, Thom A.

    1988-01-01

    The Advanced Communications Satellite (ACTS) is capable of two modes of communication. Mode 1 is a mesh network of Earth stations using baseband-switched, time-division multiple-access (BBS-TDMA) and hopping beams. Mode 2 is a mesh network using satellite-switched, time-division multiple-access (SS-TDMA) and fixed (or hopping) beams. The purpose of this paper is to present the functional requirements and the design of the ACTS Mode 1 Earth station terrestrial interface. Included among the requirements are that: (1) the interface support standard telecommunications service offerings (i.e., voice, video and data at rates ranging from 9.6 kbps to 44 Mbps); (2) the interface support the unique design characteristics of the ACTS communications systems (e.g., the real time demand assignment of satellite capacity); and (3) the interface support test hardware capable of validating ACTS communications processes. The resulting interface design makes use of an appropriate combination of T1 or T3 multiplexers and a small central office (maximum capacity 56 subscriber lines per unit).

  6. Space station operations enhancement using tethers

    NASA Astrophysics Data System (ADS)

    Bekey, I.

    1984-10-01

    Space tethers represent a tool of unusual versatility for applications to operations involving space stations. The present investigation is concerned with a number of applications which exploit the dynamic, static, and electrodynamic properties of tethers. One of the simplest applications of a tethered system on the Space Station might be that of a remote docking port, allowing the Shuttle to dock with no contamination or disturbance effects. Attention is also given to tethered platforms, a tethered microgravity facility, a tethered space station propellant facility, electrodynamic tether principles, a tether power generator, a tether thrust generator (motor), and an electrodynamic tether for drag makeup and energy storage.

  7. 47 CFR 25.218 - Off-axis EIRP density envelopes for FSS earth stations transmitting in certain frequency bands.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... applications, and (2) Analog video earth station applications. (b) Earth station applications subject to this...Hz For 7° 18 dBW/4 kHz For 48° 18 dBW/4 kHz For 48° <θ ≤85° −8 dBW/4 kHz For 85° <θ ≤180° where θ is defined in paragraph (c)(2) of...

  8. Development of a Space Station Operations Management System

    NASA Technical Reports Server (NTRS)

    Brandli, A. E.; Mccandless, W. T.

    1988-01-01

    To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

  9. Development of a Space Station Operations Management System

    NASA Astrophysics Data System (ADS)

    Brandli, A. E.; McCandless, W. T.

    To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

  10. Regenerative fuel cell energy storage system for a low earth orbit space station

    NASA Technical Reports Server (NTRS)

    Martin, R. E.; Garow, J.; Michaels, K. B.

    1988-01-01

    A study was conducted to define characteristics of a Regenerative Fuel Cell System (RFCS) for low earth orbit Space Station missions. The RFCS's were defined and characterized based on both an alkaline electrolyte fuel cell integrated with an alkaline electrolyte water electrolyzer and an alkaline electrolyte fuel cell integrated with an acid solid polymer electrolyte (SPE) water electrolyzer. The study defined the operating characteristics of the systems including system weight, volume, and efficiency. A maintenance philosophy was defined and the implications of system reliability requirements and modularization were determined. Finally, an Engineering Model System was defined and a program to develop and demonstrate the EMS and pacing technology items that should be developed in parallel with the EMS were identified. The specific weight of an optimized RFCS operating at 140 F was defined as a function of system efficiency for a range of module sizes. An EMS operating at a nominal temperature of 180 F and capable of delivery of 10 kW at an overall efficiency of 55.4 percent is described. A program to develop the EMS is described including a technology development effort for pacing technology items.

  11. Space station propulsion requirements study

    NASA Technical Reports Server (NTRS)

    Wilkinson, C. L.; Brennan, S. M.

    1985-01-01

    Propulsion system requirements to support Low Earth Orbit (LEO) manned space station development and evolution over a wide range of potential capabilities and for a variety of STS servicing and space station operating strategies are described. The term space station and the overall space station configuration refers, for the purpose of this report, to a group of potential LEO spacecraft that support the overall space station mission. The group consisted of the central space station at 28.5 deg or 90 deg inclinations, unmanned free-flying spacecraft that are both tethered and untethered, a short-range servicing vehicle, and a longer range servicing vehicle capable of GEO payload transfer. The time phasing for preferred propulsion technology approaches is also investigated, as well as the high-leverage, state-of-the-art advancements needed, and the qualitative and quantitative benefits of these advancements on STS/space station operations. The time frame of propulsion technologies applicable to this study is the early 1990's to approximately the year 2000.

  12. Earth Observations from the International Space Station: Benefits for Humanity

    NASA Technical Reports Server (NTRS)

    Stefanov, William L.

    2015-01-01

    The International Space Station (ISS) is a unique terrestrial remote sensing platform for observation of the Earth's land surface, oceans, and atmosphere. Unlike automated remote-sensing platforms it has a human crew; is equipped with both internal and externally-mounted active and passive remote sensing instruments; and has an inclined, low-Earth orbit that provides variable views and lighting (day and night) over 95 percent of the inhabited surface of the Earth. As such, it provides a useful complement to autonomous, sun-synchronous sensor systems in higher altitude polar orbits. Beginning in May 2012, NASA ISS sensor systems have been available to respond to requests for data through the International Charter, Space and Major Disasters, also known as the "International Disaster Charter" or IDC. Data from digital handheld cameras, multispectral, and hyperspectral imaging systems has been acquired in response to IDC activations and delivered to requesting agencies through the United States Geological Survey. The characteristics of the ISS for Earth observation will be presented, including past, current, and planned NASA, International Partner, and commercial remote sensing systems. The role and capabilities of the ISS for humanitarian benefit, specifically collection of remotely sensed disaster response data, will be discussed.

  13. Automating Space Station operations planning

    NASA Technical Reports Server (NTRS)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  14. Space Station Freedom assembly and operation at a 51.6 degree inclination orbit

    NASA Technical Reports Server (NTRS)

    Troutman, Patrick A.; Brewer, Laura M.; Heck, Michael L.; Kumar, Renjith R.

    1993-01-01

    This study examines the implications of assembling and operating Space Station Freedom at a 51.6 degree inclination orbit utilizing an enhanced lift Space Shuttle. Freedom assembly is currently baselined at a 220 nautical mile high, 28.5 degree inclination orbit. Some of the reasons for increasing the orbital inclination are (1) increased ground coverage for Earth observations, (2) greater accessibility from Russian and other international launch sites, and (3) increased number of Assured Crew Return Vehicle (ACRV) landing sites. Previous studies have looked at assembling Freedom at a higher inclination using both medium and heavy lift expendable launch vehicles (such as Shuttle-C and Energia). The study assumes that the shuttle is used exclusively for delivering the station to orbit and that it can gain additional payload capability from design changes such as a lighter external tank that somewhat offsets the performance decrease that occurs when the shuttle is launched to a 51.6 degree inclination orbit.

  15. Ground operation of robotics on Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Wojcik, Z. Alex; Hunter, David G.; Cantin, Marc R.

    1993-01-01

    This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.

  16. Ground operation of robotics on Space Station Freedom

    NASA Astrophysics Data System (ADS)

    Wojcik, Z. Alex; Hunter, David G.; Cantin, Marc R.

    1993-03-01

    This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.

  17. Space Station Astronauts Return Safely to Earth on This Week @NASA – December 11, 2015

    NASA Image and Video Library

    2015-12-11

    On Dec. 11 aboard the International Space Station, NASA’s Kjell Lindgren, Russian cosmonaut Oleg Kononenko and Kimiya Yui of the Japan Aerospace Exploration Agency, bid farewell to crew members remaining on the station -- including Commander Scott Kelly, NASA’s one-year mission astronaut. The returning members of Expedition 45 then climbed aboard their Soyuz spacecraft for the trip back to Earth. They safely touched down hours later in Kazakhstan – closing out a 141-day stay in space. Also, Next space station crew prepares for launch, Supply mission arrives at space station, Quantum computing lab and more!

  18. Gamma-Radiation Background Onboard Russian Orbital Stations

    NASA Astrophysics Data System (ADS)

    Dmitrenko, V. V.; Galper, A. M.; Gratchev, V. M.; Kirillov-Ugryumov, V. G.; Krivov, S. V.; Moiseev, A. A.; Ulin, S. E.; Uteshev, Z. M.; Vlasik, K. F.; Yurkin, Yn. T.

    Large manned space flight missions have several advantages for carrying out astrophysical and cosmic ray experiments, including the ability to install heavy instruments with large dimensions, increased electrical power and telemetry capacity, and the operation of fixed instruments by qualified personnel (astronauts). The main disadvantage in the use of heavy orbital stations for these experiments is the high level of background radiation generated by the interaction of station material with primary cosmic rays, high energy particles that exist in the magnetosphere of Earth, and albedo radiation from Earth. In some cases, additional radiation may originate from man-made radiation sources installed at the stations. For many years MEPhI have maintained experiments onboard manned Russian space flight missions to study primary gamma-rays at two energy intervals: 0.1 - 8 MeV and 30-600 MeV and electrons with energy more than 30 MeV. During these experiments significant time was spent investigating high energy background radiation onboard the stations. To measure 30-600 MeV gamma-rays, the gas-Cherenkov-scintillation telescope Elena was used. The angular view of this telescope was 10 deg, with a geometrical factor of 0.5 cm2sr. This telescope was operated onboard the orbital stations Salyut-6 and Salyut-7. Usually these stations were operated together with the space missions Soyuz and Progress. For background measurements, cosmonauts installed the telescope at various locations on Salyut, Soyuz and Progress, and oriented it in various directions respectively to the station's axes. During these experiments, the orbital stations were not oriented.

  19. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...

  20. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...

  1. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...

  2. Design and operation of a Loran-C time reference station

    NASA Technical Reports Server (NTRS)

    Putkovich, K.

    1974-01-01

    Some of the practical questions that arise when one decides to use Loran-C in a time reference system are explored. An extensive effort is made to provide basic, practical information on establishing and operating a reference station. Four areas were covered: (1) the design, configuration and operational concepts which should be considered prior to establishing and operating a reference station using Loran-C, (2) the options and tradeoffs available regarding capabilities, cost, size, versatility, ease of operation, etc., that are available to the designer, (3) what measurements are made, how they are made and what they mean, and (4) the experience the U.S. Naval Observatory Time Service Division has had in the design and operation of such stations.

  3. 47 CFR 25.227 - Blanket licensing provisions for Earth Stations Aboard Aircraft (ESAAs) receiving in the 10.95-11...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Aboard Aircraft (ESAAs) receiving in the 10.95-11.2 GHz (space-to-Earth), 11.45-11.7 GHz (space-to-Earth), and 11.7-12.2 GHz (space-to-Earth) frequency bands and transmitting in the 14.0-14.5 GHz (Earth-to... SATELLITE COMMUNICATIONS Technical Standards § 25.227 Blanket licensing provisions for Earth Stations Aboard...

  4. 47 CFR 25.227 - Blanket licensing provisions for Earth Stations Aboard Aircraft (ESAAs) receiving in the 10.95-11...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Aboard Aircraft (ESAAs) receiving in the 10.95-11.2 GHz (space-to-Earth), 11.45-11.7 GHz (space-to-Earth), and 11.7-12.2 GHz (space-to-Earth) frequency bands and transmitting in the 14.0-14.5 GHz (Earth-to... SATELLITE COMMUNICATIONS Technical Standards § 25.227 Blanket licensing provisions for Earth Stations Aboard...

  5. 47 CFR 25.256 - Special Requirements for operations in the 3.65-3.7 GHz band.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., part 90 that seeks to place base and fixed stations in operation within 150 km of a primary earth station, licensees of earth stations operating on a primary basis in the Fixed-Satellite Service in the 3...

  6. 47 CFR 25.256 - Special Requirements for operations in the 3.65-3.7 GHz band.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Part 90 that seeks to place base and fixed stations in operation within 150 km of a primary earth station, licensees of earth stations operating on a primary basis in the Fixed-Satellite Service in the 3...

  7. 47 CFR 25.256 - Special Requirements for operations in the 3.65-3.7 GHz band.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Part 90 that seeks to place base and fixed stations in operation within 150 km of a primary earth station, licensees of earth stations operating on a primary basis in the fixed satellite service in the 3...

  8. Earth Observations taken during Expedition 16/STS-120 Joint Operations

    NASA Image and Video Library

    2007-11-03

    ISS016-E-009407 (3 Nov. 2007) --- Layers of Earth's atmosphere, brightly colored as the sun rises, are featured in this image photographed by an Expedition 16 crewmember on the International Space Station.

  9. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile earth stations, shall specify as a condition therein the period in...

  10. 47 CFR 95.179 - Individuals who may be station operators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....179 Section 95.179 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL... be station operators. (a) An individual GMRS system licensee may permit immediate family members to be station operators in his or her GMRS system. Immediate family members are the: (1) Licensee; (2...

  11. Space station operations task force. Panel 3 report: User development and integration

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The User Development and Integration Panel of the Space Station Operations Task Force was chartered to develop concepts relating to the operations of the Space Station manned base and the platforms, user accommodation and integration activities. The needs of the user community are addressed in the context with the mature operations phase of the Space Station. Issues addressed include space station pricing options, marketing strategies, payload selection and resource allocation options, and manifesting techniques.

  12. EOS production on the Space Station. [Electrophoresis Operations/Space

    NASA Technical Reports Server (NTRS)

    Runge, F. C.; Gleason, M.

    1986-01-01

    The paper discusses a conceptual integration of the equipment for EOS (Electrophoresis Operations/Space) on the Space Station in the early 1990s. Electrophoresis is a fluid-constituent separation technique which uses forces created by an electrical field. Aspects covered include EOS equipment and operations, and Space Station installations involving a pressurized module, a resupply module, utility provisions and umbilicals and crew involvement. Accommodation feasibility is generally established, and interfaces are defined. Space Station production of EOS-derived pharmaceuticals will constitute a significant increase in capability compared to precursor flights on the Shuttle in the 1980s.

  13. 78 FR 39200 - Federal Earth Stations-Non-Federal Fixed Satellite Service Space Stations; Spectrum for Non...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... stations comply with the Commission's rules for operating in the frequency bands. 11. The Commission seeks... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 2 [ET Docket No. 13-115; RM-11341; FCC 13-65... Launch Operations AGENCY: Federal Communications Commission. ACTION: Proposed rule. SUMMARY: This...

  14. Earth's gravity field to the eighteenth degree and geocentric coordinates for 104 stations from satellite and terrestrial data

    NASA Technical Reports Server (NTRS)

    Gaposchkin, E. M.

    1973-01-01

    Geodetic parameters describing the earth's gravity field and the positions of satellite-tracking stations in a geocentric reference frame were computed. These parameters were estimated by means of a combination of five different types of data: routine and simultaneous satellite observations, observations of deep-space probes, measurements of terrestrial gravity, and surface-triangulation data. The combination gives better parameters than does any subset of data types. The dynamic solution used precision-reduced Baker-Nunn observations and laser range data of 25 satellites. Data from the 49-station National Oceanic and Atmospheric Administration BC-4 network, the 19-station Smithsonian Astrophysical Observatory Baker-Nunn network, and independent camera stations were employed in the geometrical solution. Data from the tracking of deep-space probes were converted to relative longitudes and distances to the earth's axis of rotation of the tracking stations. Surface-gravity data in the form of 550-km squares were derived from 19,328 1 deg X 1 deg mean gravity anomalies.

  15. Space station operations task force. Panel 4 report: Management integration

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.

  16. Robotic assembly and maintenance of future space stations based on the ISS mission operations experience

    NASA Astrophysics Data System (ADS)

    Rembala, Richard; Ower, Cameron

    2009-10-01

    MDA has provided 25 years of real-time engineering support to Shuttle (Canadarm) and ISS (Canadarm2) robotic operations beginning with the second shuttle flight STS-2 in 1981. In this capacity, our engineering support teams have become familiar with the evolution of mission planning and flight support practices for robotic assembly and support operations at mission control. This paper presents observations on existing practices and ideas to achieve reduced operational overhead to present programs. It also identifies areas where robotic assembly and maintenance of future space stations and space-based facilities could be accomplished more effectively and efficiently. Specifically, our experience shows that past and current space Shuttle and ISS assembly and maintenance operations have used the approach of extensive preflight mission planning and training to prepare the flight crews for the entire mission. This has been driven by the overall communication latency between the earth and remote location of the space station/vehicle as well as the lack of consistent robotic and interface standards. While the early Shuttle and ISS architectures included robotics, their eventual benefits on the overall assembly and maintenance operations could have been greater through incorporating them as a major design driver from the beginning of the system design. Lessons learned from the ISS highlight the potential benefits of real-time health monitoring systems, consistent standards for robotic interfaces and procedures and automated script-driven ground control in future space station assembly and logistics architectures. In addition, advances in computer vision systems and remote operation, supervised autonomous command and control systems offer the potential to adjust the balance between assembly and maintenance tasks performed using extra vehicular activity (EVA), extra vehicular robotics (EVR) and EVR controlled from the ground, offloading the EVA astronaut and even the robotic

  17. Earth resources instrumentation for the Space Station Polar Platform

    NASA Technical Reports Server (NTRS)

    Donohoe, Martin J.; Vane, Deborah

    1986-01-01

    The spacecraft and payloads of the Space Station Polar Platform program are described in a brief overview. Present plans call for one platform in a descending morning-equator-crossing orbit at 824 km and two or three platforms in ascending afternoon-crossing orbits at 542-824 km. The components of the NASA Earth Observing System (EOS) and NOAA payloads are listed in tables and briefly characterized, and data-distribution requirements and the mission development schedule are discussed. A drawing of the platform, a graph showing the spectral coverage of the EOS instruments, and a glossary of acronyms are provided.

  18. 47 CFR 73.513 - Noncommercial educational FM stations operating on unreserved channels.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Noncommercial educational FM stations operating... (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Noncommercial Educational FM Broadcast Stations § 73.513 Noncommercial educational FM stations operating on unreserved channels. (a) Noncommercial...

  19. 47 CFR 73.513 - Noncommercial educational FM stations operating on unreserved channels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Noncommercial educational FM stations operating... (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Noncommercial Educational FM Broadcast Stations § 73.513 Noncommercial educational FM stations operating on unreserved channels. (a) Noncommercial...

  20. Space Station

    NASA Image and Video Library

    1970-01-01

    This is an illustration of the Space Base concept. In-house work of the Marshall Space Flight Center, as well as a Phase B contract with the McDornel Douglas Astronautics Company, resulted in a preliminary design for a space station in 1969 and l970. The Marshall-McDonnel Douglas approach envisioned the use of two common modules as the core configuration of a 12-man space station. Each common module was 33 feet in diameter and 40 feet in length and provided the building blocks, not only for the space station, but also for a 50-man space base. Coupled together, the two modules would form a four-deck facility: two decks for laboratories and two decks for operations and living quarters. Zero-gravity would be the normal mode of operation, although the station would have an artificial-gravity capability. This general-purpose orbital facility was to provide wide-ranging research capabilities. The design of the facility was driven by the need to accommodate a broad spectrum of activities in support of astronomy, astrophysics, aerospace medicine, biology, materials processing, space physics, and space manufacturing. To serve the needs of Earth observations, the station was to be placed in a 242-nautical-mile orbit at a 55-degree inclination. An Intermediate-21 vehicle (comprised of Saturn S-IC and S-II stages) would have launched the station in 1977.

  1. Space station proximity operations windows: Human factors design guidelines

    NASA Technical Reports Server (NTRS)

    Haines, Richard F.

    1987-01-01

    Proximity operations refers to all activities outside the Space Station which take place within a 1-km radius. Since there will be a large number of different operations involving manned and unmanned vehicles, single- and multiperson crews, automated and manually controlled flight, a wide variety of cargo, and construction/repair activities, accurate and continuous human monitoring of these operations from a specially designed control station on Space Station will be required. Total situational awareness will be required. This paper presents numerous human factors design guidelines and related background information for control windows which will support proximity operations. Separate sections deal with natural and artificial illumination geometry; all basic rendezvous vector approaches; window field-of-view requirements; window size; shape and placement criteria; window optical characteristics as they relate to human perception; maintenance and protection issues; and a comprehensive review of windows installed on U.S. and U.S.S.R. manned vehicles.

  2. The International Space Station: A Low-Earth Orbit (LEO) Test Bed for Advancements in Space and Environmental Medicine

    NASA Technical Reports Server (NTRS)

    Ruttley, Tara M.; Robinson, Julie A.

    2010-01-01

    Ground-based space analog projects such as the NASA Extreme Environment Mission Operations (NEEMO) can be valuable test beds for evaluation of experimental design and hardware feasibility before actually being implemented on orbit. The International Space Station (ISS) is an closed-system laboratory that orbits 240 miles above the Earth, and is the ultimate extreme environment. Its inhabitants spend hours performing research that spans from fluid physics to human physiology, yielding results that have implications for Earth-based improvements in medicine and health, as well as those that will help facilitate the mitigation of risks to the human body associated with exploration-class space missions. ISS health and medical experiments focus on pre-flight and in-flight prevention, in-flight treatment, and postflight recovery of health problems associated with space flight. Such experiments include those on enhanced medical monitoring, bone and muscle loss prevention, cardiovascular health, immunology, radiation and behavior. Lessons learned from ISS experiments may not only be applicable to other extreme environments that face similar capability limitations, but also serve to enhance standards of care for everyday use on Earth.

  3. 47 CFR 80.1073 - Radio operator requirements for ship stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Radio operator requirements for ship stations...) General Provisions § 80.1073 Radio operator requirements for ship stations. (a) Ships must carry at least... required by § 80.1123 are properly maintained; and (6) Responsible for ensuring that the ship's navigation...

  4. 47 CFR 80.1073 - Radio operator requirements for ship stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Radio operator requirements for ship stations...) General Provisions § 80.1073 Radio operator requirements for ship stations. (a) Ships must carry at least... required by § 80.1123 are properly maintained; and (6) Responsible for ensuring that the ship's navigation...

  5. 47 CFR 80.1073 - Radio operator requirements for ship stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Radio operator requirements for ship stations...) General Provisions § 80.1073 Radio operator requirements for ship stations. (a) Ships must carry at least... required by § 80.1123 are properly maintained; and (6) Responsible for ensuring that the ship's navigation...

  6. 47 CFR 80.1073 - Radio operator requirements for ship stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Radio operator requirements for ship stations...) General Provisions § 80.1073 Radio operator requirements for ship stations. (a) Ships must carry at least... required by § 80.1123 are properly maintained; and (6) Responsible for ensuring that the ship's navigation...

  7. PBO Nucleus Project Status: Integration of 209 Existing GPS Stations into the Plate Boundary Observatory

    NASA Astrophysics Data System (ADS)

    Blume, F.; Meertens, C.; Anderson, G.; Eriksson, S.; Boyce, E.

    2007-12-01

    Tectonic and earthquake research in the US has experienced a quiet revolution over the last decade precipitated by the recognition that slow-motion faulting events can both trigger and be triggered by regular earthquakes. Transient motion has now been found in essentially all tectonic environments, and the detection and analysis of such events is the first-order science target of the EarthScope Project. Because of this and a host of other fundamental tectonics questions that can be answered only with long-duration geodetic time series, the incipient 1100-station EarthScope Plate Boundary Observatory (PBO) network has been designed to leverage 445 existing continuous GPS stations whose measurements extend back over a decade. The irreplaceable recording history of these stations will accelerate EarthScope scientific return by providing the highest possible resolution. This resolution will be used to detect and understand transients, to determine the three-dimensional velocity field (particularly vertical motion), and to improve measurement precision by understanding the complex noise sources inherent in GPS. The PBO Nucleus project supports the operation, maintenance and hardware upgrades of a subset of the six western U.S. geodetic networks until they are subsumed by PBO. Uninterrupted data flow from these stations will effectively double the time-series length of PBO over the expected life of EarthScope, and has created, for the first time, a single GPS-based geodetic network in the US. The other existing sites remain in operation under support from non-NSF sources (e.g. the USGS), and EarthScope continues to benefit from their continued operation On the grounds of relevance to EarthScope science goals, geographic distribution and data quality, 209 of the 432 existing stations were selected as the nucleus upon which to build PBO. Conversion of these stations to a PBO-compatible mode of operation was begun under previous funding, and as a result data now flow

  8. Space Station

    NASA Image and Video Library

    1969-01-01

    This picture illustrates a concept of a 33-Foot-Diameter Space Station Leading to a Space Base. In-house work of the Marshall Space Flight Center, as well as a Phase B contract with the McDornel Douglas Astronautics Company, resulted in a preliminary design for a space station in 1969 and l970. The Marshall-McDonnel Douglas approach envisioned the use of two common modules as the core configuration of a 12-man space station. Each common module was 33 feet in diameter and 40 feet in length and provided the building blocks, not only for the space station, but also for a 50-man space base. Coupled together, the two modules would form a four-deck facility: two decks for laboratories and two decks for operations and living quarters. Zero-gravity would be the normal mode of operation, although the station would have an artificial gravity capability. This general-purpose orbital facility was to provide wide-ranging research capabilities. The design of the facility was driven by the need to accommodate a broad spectrum of activities in support of astronomy, astrophysics, aerospace medicine, biology, materials processing, space physics, and space manufacturing. To serve the needs of Earth observations, the station was to be placed in a 242-nautical-mile orbit at a 55-degree inclination. An Intermediate-21 vehicle (comprised of Saturn S-IC and S-II stages) would have launched the station in 1977.

  9. Modular space station phase B extension integrated ground operations

    NASA Technical Reports Server (NTRS)

    Selegue, D. F.

    1971-01-01

    Requirements for development test, manufacturing, facilities, GSE, training, logistics support, and launch operations are described. The prime integrating requirement is the early establishment of a common data base and its use throughout the design, development, and operational life of the station. The common data base is defined, and the concept of its use is presented. Development requirements for the station modules and subsystems are outlined along with a master development phasing chart.

  10. Adaption of Space Station technology for lunar operations

    NASA Technical Reports Server (NTRS)

    Garvey, J. M.

    1988-01-01

    The possible use of Space Station technology in a lunar base program is discussed, focusing on the lunar lander/ascent vehicles and surface modules. The application of the Space Station data management system, software, and communications, tracking, guidance, navigation, control, and power technologies is examined. The benefits of utilizing this technology for lunar operations are considered.

  11. An Operations Management System for the Space Station

    NASA Astrophysics Data System (ADS)

    Rosenthal, H. G.

    1986-09-01

    This paper presents an overview of the conceptual design of an integrated onboard Operations Management System (OMS). Both hardware and software concepts are presented and the integrated space station network is discussed. It is shown that using currently available software technology, an integrated software solution for Space Station management and control, implemented with OMS software, is feasible.

  12. Workshop on Instructional Features and Instructor/Operator Station Design for Training Systems.

    ERIC Educational Resources Information Center

    Ricard, G. L., Ed.; And Others

    These 19 papers review current research and development work related to the operation of the instructor's station of training systems, with emphasis on developing functional station specifications applicable to a variety of simulation-based training situations. Topics include (1) instructional features; (2) instructor/operator station research and…

  13. EarthScope's Transportable Array in Alaska and Western Canada

    NASA Astrophysics Data System (ADS)

    Enders, M.; Miner, J.; Bierma, R. M.; Busby, R.

    2015-12-01

    EarthScope's Transportable Array (TA) in Alaska and Canada is an ongoing deployment of 261 high quality broadband seismographs. The Alaska TA is the continuation of the rolling TA/USArray deployment of 400 broadband seismographs in the lower 48 contiguous states and builds on the success of the TA project there. The TA in Alaska and Canada is operated by the IRIS Consortium on behalf of the National Science Foundation as part of the EarthScope program. By Sept 2015, it is anticipated that the TA network in Alaska and Canada will be operating 105 stations. During the summer 2015, TA field crews comprised of IRIS and HTSI station specialists, as well as representatives from our partner agencies the Alaska Earthquake Center and the Alaska Volcano Observatory and engineers from the UNAVCO Plate Boundary Observatory will have completed a total of 36 new station installations. Additionally, we will have completed upgrades at 9 existing Alaska Earthquake Center stations with borehole seismometers and the adoption of an additional 35 existing stations. As the array doubles in Alaska, IRIS continues to collaborate closely with other network operators, universities and research consortia in Alaska and Canada including the Alaska Earthquake Center (AEC), the Alaska Volcano Observatory (AVO), the UNAVCO Plate Boundary Observatory (PBO), the National Tsunami Warning Center (NTWC), Natural Resources Canada (NRCAN), Canadian Hazard Information Service (CHIS), the Yukon Geologic Survey (YGS), the Pacific Geoscience Center of the Geologic Survey, Yukon College and others. During FY14 and FY15 the TA has completed upgrade work at 20 Alaska Earthquake Center stations and 2 AVO stations, TA has co-located borehole seismometers at 5 existing PBO GPS stations to augment the EarthScope observatory. We present an overview of deployment plan and the status through 2015. The performance of new Alaska TA stations including improvements to existing stations is described.

  14. Telerobot operator control station requirements

    NASA Technical Reports Server (NTRS)

    Kan, Edwin P.

    1988-01-01

    The operator control station of a telerobot system has unique functional and human factors requirements. It has to satisfy the needs of a truly interactive and user-friendly complex system, a telerobot system being a hybrid between a teleoperated and an autonomous system. These functional, hardware and software requirements are discussed, with explicit reference to the design objectives and constraints of the JPL/NASA Telerobot Demonstrator System.

  15. How the Station will operate. [operation, management, and maintenance in space

    NASA Technical Reports Server (NTRS)

    Cox, John T.

    1988-01-01

    Aspects of the upcoming operational phase of the Space Station (SS) are examined. What the crew members will do with their time in their specialized roles is addressed. SS maintenance and servicing and the interaction of the SS Control Center with Johnson Space Center is discussed. The planning of payload operations and strategic planning for the SS are examined.

  16. The Crew Earth Observations Experiment: Earth System Science from the ISS

    NASA Technical Reports Server (NTRS)

    Stefanov, William L.; Evans, Cynthia A.; Robinson, Julie A.; Wilkinson, M. Justin

    2007-01-01

    This viewgraph presentation reviews the use of Astronaut Photography (AP) as taken from the International Space Station (ISS) in Earth System Science (ESS). Included are slides showing basic remote sensing theory, data characteristics of astronaut photography, astronaut training and operations, crew Earth observations group, targeting sites and acquisition, cataloging and database, analysis and applications for ESS, image analysis of particular interest urban areas, megafans, deltas, coral reefs. There are examples of the photographs and the analysis.

  17. Automated delay measurement system for an Earth station for Two-Way Satellite Time and Frequency Transfer

    NASA Technical Reports Server (NTRS)

    Dejong, Gerrit; Polderman, Michel C.

    1995-01-01

    The measurement of the difference of the transmit and receive delays of the signals in a Two-Way Satellite Time and Frequency Transfer (TWSTFT) Earth station is crucial for its nanosecond time transfer capability. Also, the monitoring of the change of this delay difference with time, temperature, humidity, or barometric pressure is important for improving the TWSTFT capabilities. An automated system for this purpose has been developed from the initial design at NMi-VSL. It calibrates separately the transmit and receive delays in cables, amplifiers, upconverters and downconverters, and antenna feeds. The obtained results can be applied as corrections to the TWSTFT measurement when, before and after a measurement session, a calibration session is performed. Preliminary results obtained at NMi-VSL will be shown. Also, if available, the results of a manual version of the system that is planned to be circulated in Sept. 1994 together with a USNO portable station on a calibration trip to European TWSTFT Earth stations.

  18. Solaris: Orbital station: Automatic laboratory for outer space rendezvous and operations

    NASA Technical Reports Server (NTRS)

    Runavot, J. J.

    1981-01-01

    The preliminary design for a modular orbital space station (unmanned) is outlined. The three main components are a support module, an experiment module, and an orbital transport vehicle. The major types of missions (assembly, materials processing, and Earth observation) that could be performed are discussed.

  19. The expanded role of computers in Space Station Freedom real-time operations

    NASA Technical Reports Server (NTRS)

    Crawford, R. Paul; Cannon, Kathleen V.

    1990-01-01

    The challenges that NASA and its international partners face in their real-time operation of the Space Station Freedom necessitate an increased role on the part of computers. In building the operational concepts concerning the role of the computer, the Space Station program is using lessons learned experience from past programs, knowledge of the needs of future space programs, and technical advances in the computer industry. The computer is expected to contribute most significantly in real-time operations by forming a versatile operating architecture, a responsive operations tool set, and an environment that promotes effective and efficient utilization of Space Station Freedom resources.

  20. Sensitivity study of Space Station Freedom operations cost and selected user resources

    NASA Technical Reports Server (NTRS)

    Accola, Anne; Fincannon, H. J.; Williams, Gregory J.; Meier, R. Timothy

    1990-01-01

    The results of sensitivity studies performed to estimate probable ranges for four key Space Station parameters using the Space Station Freedom's Model for Estimating Space Station Operations Cost (MESSOC) are discussed. The variables examined are grouped into five main categories: logistics, crew, design, space transportation system, and training. The modification of these variables implies programmatic decisions in areas such as orbital replacement unit (ORU) design, investment in repair capabilities, and crew operations policies. The model utilizes a wide range of algorithms and an extensive trial logistics data base to represent Space Station operations. The trial logistics data base consists largely of a collection of the ORUs that comprise the mature station, and their characteristics based on current engineering understanding of the Space Station. A nondimensional approach is used to examine the relative importance of variables on parameters.

  1. Space Station Initial Operational Concept (IOC) operations and safety view - Automation and robotics for Space Station

    NASA Technical Reports Server (NTRS)

    Bates, William V., Jr.

    1989-01-01

    The automation and robotics requirements for the Space Station Initial Operational Concept (IOC) are discussed. The amount of tasks to be performed by an eight-person crew, the need for an automated or directed fault analysis capability, and ground support requirements are considered. Issues important in determining the role of automation for the IOC are listed.

  2. Remote manual operator for space station intermodule ventilation valve

    NASA Technical Reports Server (NTRS)

    Guyaux, James R.

    1996-01-01

    The Remote Manual Operator (RMO) is a mechanism used for manual operation of the Space Station Intermodule Ventilation (IMV) valve and for visual indication of valve position. The IMV is a butterfly-type valve, located in the ventilation or air circulation ducts of the Space Station, and is used to interconnect or isolate the various compartments. The IMV valve is normally operated by an electric motor-driven actuator under computer or astronaut control, but it can also be operated manually with the RMO. The IMV valve RMO consists of a handle with a deployment linkage, a gear-driven flexible shaft, and a linkage to disengage the electric motor actuator during manual operation. It also provides visual indication of valve position. The IMV valve RMO is currently being prepared for qualification testing.

  3. Space station needs, attributes and architectural options study. Volume 2: Mission analysis

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Space environment studies, astrophysics, Earth environment, life sciences, and material sciences are discussed. Commercial communication, materials processing, and Earth observation missions are addressed. Technology development, space operations, scenarios of operational capability, mission requirements, and benefits analysis results for space-produced gallium arsenide crystals, direct broadcasting satellite systems, and a high inclination space station are covered.

  4. International Space Station Payload Operations Integration

    NASA Technical Reports Server (NTRS)

    Fanske, Elizabeth Anne

    2011-01-01

    The Payload Operations Integrator (POINT) plays an integral part in the Certification of Flight Readiness process for the Mission Operations Laboratory and the Payload Operations Integration Function that supports International Space Station Payload operations. The POINTs operate in support of the POIF Payload Operations Manager to bring together and integrate the Certification of Flight Readiness inputs from various MOL teams through maintaining an open work tracking log. The POINTs create monthly metrics for current and future payloads that the Payload Operations Integration Function supports. With these tools, the POINTs assemble the Certification of Flight Readiness package before a given flight, stating that the Mission Operations Laboratory is prepared to support it. I have prepared metrics for Increment 29/30, maintained the Open Work Tracking Logs for Flights ULF6 (STS-134) and ULF7 (STS-135), and submitted the Mission Operations Laboratory Certification of Flight Readiness package for Flight 44P to the Mission Operations Directorate (MOD/OZ).

  5. 12. VIEW OF OPERATING ROOMRCA COMMUNICATION REC STATION (THIS ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW OF OPERATING ROOM-RCA COMMUNICATION REC STATION (THIS ROOM WAS ORIGINALLY A MOTOR GENERATOR FACILITY AND SUPPLIED DC POWER TO AN EARLIER GENERATION OF POINT-TO-POINT RECEIVERS ON SECOND FLOOR). VIEW SHOWS TRANSMITTER CONTROL STATION AND AUDIO CONTROL STATION (LEFT, WATKINS-JOHNSON WJ-8718-23. HP RECEIVERS AND KENWOOD R-5000 COMMUNICATIONS RECEIVERS (220 DEGREES). - Marconi Radio Sites, Receiving, Point Reyes Station, Marin County, CA

  6. A DTN-ready application for the real-time dissemination of Earth Observation data received by Direct Readout stations

    NASA Astrophysics Data System (ADS)

    Paronis, Dimitris; Daglis, Ioannis A.; Diamantopoulos, Sotirios; Tsaoussidis, Vassilis; Tsigkanos, Antonis; Ghita, Bogdan; Evans, Michael

    2014-05-01

    The majority of Earth observation satellites operate in low Earth sun-synchronous orbit and transmit data captured by a variety of sensors. The effective dissemination of satellite data in real-time is a crucial parameter for disaster monitoring in particular. Generally, a spacecraft collects data and then stores it on-board until it passes over dedicated ground stations to transmit the data. Additionally, some satellites (e.g. Terra, Aqua, Suomi-NPP, NOAA series satellites) have the so-called Direct Broadcast (DB) capability, which is based on a real-time data transmission sub-system. Compatible Direct Readout (DR) stations in direct line of sight are able to receive these transmissions. To date data exchange between DR stations have not been fully exploited for real-time data dissemination. Stations around the world store data locally, which is then disseminated on demand via Internet gateways based on the standard TCP-IP protocols. On the other hand, Delay Tolerant Networks (DTNs), which deliver data by enabling store-and-forward transmission in order to cope with link failures, service disruptions and network congestion, could prove as an alternative/complementary transmission mechanism for the efficient dissemination of data. The DTN architecture allows for efficient utilization of the network, using in-network storage and taking advantage of the network availability among the interconnected nodes. Although DTNs were originally developed for high-propagation delay, challenged connectivity environments such as deep space, the broader research community has investigated possible architectural enhancements for various emerging applications (e.g., terrestrial infrastructure, ground-to-air communications, content retrieval and dissemination). In this paper, a scheme for the effective dissemination of DB data is conceptualized, designed and implemented based on store-and-forward transmission capabilities provided by DTNs. For demonstration purposes, a set-up has

  7. Space Station - Government and industry launch joint venture

    NASA Astrophysics Data System (ADS)

    Nichols, R. G.

    1985-04-01

    After the development of the space transportation system over the last decade, the decision to launch a permanently manned space station was announced by President Reagan in his 1984 State of the Union Address. As a result of work performed by the Space Station Task Force created in 1982, NASA was able to present Congress with a plan for achieving the President's objective. The plan envisions a space station which would cost about $8 billion and be operational as early as 1992. The functions of the Space Station would include the servicing of satellites. In addition, the station would serve as a base for the construction of large space structures, and provide facilities for research and development. The Space Station design selected by NASA is the 'Power Tower', a 450-foot-long truss structure which will travel in orbit with its main axis perpendicular to the earth's surface. Attention is given to the living and working quarters for the crew, the location of earth observation equipment and astronomical instruments, and details regarding the employment of the Station.

  8. 47 CFR 25.222 - Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 10.95-11.2 GHz...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... on Vessels (ESVs) receiving in the 10.95-11.2 GHz (space-to-Earth), 11.45-11.7 GHz (space-to-Earth), 11.7-12.2 GHz (space-to-Earth) frequency bands and transmitting in the 14.0-14.5 GHz (Earth-to-space... SATELLITE COMMUNICATIONS Technical Standards § 25.222 Blanket Licensing provisions for Earth Stations on...

  9. 47 CFR 25.222 - Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 10.95-11.2 GHz...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... on Vessels (ESVs) receiving in the 10.95-11.2 GHz (space-to-Earth), 11.45-11.7 GHz (space-to-Earth), 11.7-12.2 GHz (space-to-Earth) frequency bands and transmitting in the 14.0-14.5 GHz (Earth-to-space... SATELLITE COMMUNICATIONS Technical Standards § 25.222 Blanket Licensing provisions for Earth Stations on...

  10. 47 CFR 25.222 - Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 10.95-11.2 GHz...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... on Vessels (ESVs) receiving in the 10.95-11.2 GHz (space-to-Earth), 11.45-11.7 GHz (space-to-Earth), 11.7-12.2 GHz (space-to-Earth) frequency bands and transmitting in the 14.0-14.5 GHz (Earth-to-space... SATELLITE COMMUNICATIONS Technical Standards § 25.222 Blanket Licensing provisions for Earth Stations on...

  11. Accommodations for earth-viewing payloads on the international space station

    NASA Astrophysics Data System (ADS)

    Park, B.; Eppler, D. B.

    The design of the International Space Station (ISS) includes payload locations that are external to the pressurized environment. These external or attached payload accommodation locations will allow direct access to the space environment at the ISS orbit and direct viewing of the earth and space. NASA sponsored payloads will have access to several different types of standard external locations; the S3 Truss Sites, the Columbus External Payload Facility (EPF), and the Japanese Experiment Module Exposed Facility (JEM-EF). As the ISS Program develops, it may also be possible to locate external payloads at the P3 Truss Sites or at non-standard locations similar to the handrail-attached payloads that were flown during the MIR Program. Earth-viewing payloads may also be located within the pressurized volume of the US Lab in the Window Observational Research Facility (WORF). Payload accommodations at each of the locations will be described, as well as transport to and retrieval from the site.

  12. Enhanced methods for operating refueling station tube-trailers to reduce refueling cost

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elgowainy, Amgad; Reddi, Krishna

    A method and apparatus are provided for operating a refueling station including source tube-trailers and at least one compressor to reduce refueling cost. The refueling station includes a gaseous fuel supply source including a plurality of tanks on a tube trailer coupled to a first control unit, and high pressure buffer storage having predefined capacity coupled to a second control unit and the first tanks by a pressure control valve and the first control unit, and at least one compressor. The refueling station is operated at different modes depending on a state of the refueling station at the beginning ofmore » each operational mode. The refueling system is assessed at the end of each operational mode to identify the state of the system and select a next mode of operation. The operational modes include consolidating hydrogen, or any gaseous fuel, within the tubes mounted on the trailer.« less

  13. Centaur operations at the space station: Cost and transportation analysis

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A study was conducted to expand on the results of an initial study entitled Centaur Operations at the Space Station. The previous study developed technology demonstration missions (TDMs) that utilized the Centaur G-prime upper stage to advance OTV technologies required for accomodations and operations at the Space Station. An initial evaluation was performed of the cost to NASA for TDM implementation. Due to the potential for commercial communication satellite operation utilizing the TDM hardware, an evaluation of the Centaur's transportation potential was also performed.

  14. Battery performance of the SKYNET 4A spacecraft during the first six years of on station operation

    NASA Technical Reports Server (NTRS)

    Johnson, P. J.; Francis, N. R.

    1996-01-01

    The SKYNET 4A spacecraft is a three-axis stabilized geostationary earth-orbiting military communications satellite which was launched on 1 Jan. 1990 aboard a Titan 3 launch vehicle. The power subsystem is a twin bus, twin battery semi-regulated system and is equipped with one 28-cell, 35 Ampere-hour battery per bus. The cells were manufactured by Gates Aerospace Batteries of Gainesville, FL, and the batteries were built, tested and integrated by British Aerospace Space Systems Ltd. This paper presents a brief survey of the first six years of on-station operation and the operational battery management strategy that has been adopted. Thermal management constraints have led to an unconventional battery operational regime. However, no sign of degradation is evident and the observed spacecraft battery performance remains nominal.

  15. 77 FR 76541 - Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ....; Pilgrim Nuclear Power Station AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and... licensee), for operation of the Pilgrim Nuclear Power Station (Pilgrim), located in Plymouth, Massachusetts... Regarding Pilgrim Nuclear Power Station, Final Report- Appendices,'' published in July 2007 (ADAMS Accession...

  16. PBO Nucleus Project Status: Integration of 209 Existing GPS Stations into the Plate Boundary Observatory.

    NASA Astrophysics Data System (ADS)

    Blume, F.; Prescott, W.; Anderson, G.; Eriksson, S.; Feldl, N.

    2006-12-01

    Tectonic and earthquake research in the US has experienced a quiet revolution over the last decade precipitated by the recognition that slow-motion faulting events can both trigger and be triggered by regular earthquakes. Transient motion has now been found in essentially all tectonic environments, and the detection and analysis of such events is the first-order science target of the EarthScope Project. Because of this and a host of other fundamental tectonics questions that can be answered only with long-duration geodetic time series, the incipient 1400-station EarthScope Plate Boundary Observatory (PBO) network has been designed to leverage 432 existing continuous GPS stations whose measurements extend back over a decade. The irreplaceable recording history of these stations is accelerating EarthScope scientific return by providing the highest possible resolution. This resolution will be used to detect and understand transients, to determine the three-dimensional velocity field (particularly vertical motion), and to improve measurement precision by understanding the complex noise sources inherent in GPS. The PBO Nucleus project supports the operation, maintenance and hardware upgrades of a subset of the six western U.S. geodetic networks until they are subsumed by PBO. Uninterrupted data flow from these stations will effectively double the time-series length of PBO over the expected life of EarthScope, and has created, for the first time, a single GPS-based geodetic network in the US. The other existing sites remain in operation under support from non-NSF sources (e.g. the USGS), and EarthScope continues to benefit from their continued operation. On the grounds of relevance to EarthScope science goals, geographic distribution and data quality, 209 of the 432 existing stations were selected as the nucleus upon which to build PBO. Conversion of these stations to a PBO-compatible mode of operation was begun under previous funding, and as a result data now flow

  17. Operational procedures for ground station operation: ATS-3 Hawaii-Ames satellite link experiment

    NASA Technical Reports Server (NTRS)

    Nishioka, K.; Gross, E. H.

    1979-01-01

    Hardware description and operational procedures for the ATS-3 Hawaii-Ames satellite computer link are presented in basic step-by-step instructions. Transmit and receive channels and frequencies are given. Details such as switch settings for activating the station to the sequence of turning switches on are provided. Methods and procedures for troubleshooting common problems encountered with communication stations are also provided.

  18. The International Space Station: A Pathway to the Future

    NASA Technical Reports Server (NTRS)

    Kitmacher, Gary H.; Gerstenmaier, William H.; Bartoe, John-David F.; Mustachio, Nicholas

    2004-01-01

    Nearly six years after the launch of the first International Space Station element, and four years after its initial occupation, the United States and our 16 international partners have made great strides in operating this impressive Earth orbiting research facility. This past year we have done so in the face of the adversity of operating without the benefit of the Space Shuttle. In his January 14, 2004, speech announcing a new vision for America's space program, President Bush affirmed the United States' commitment to completing construction of the International Space Station by 2010. The President also stated that we would focus our future research aboard the Station on the longterm effects of space travel on human biology. This research will help enable human crews to venture through the vast voids of space for months at a time. In addition, ISS affords a unique opportunity to serve as an engineering test bed for hardware and operations critical to the exploration tasks. NASA looks forward to working with our partners on International Space Station research that will help open up new pathways for future exploration and discovery beyond low Earth orbit. This paper provides an overview of the International Space Station Program focusing on a review of the events of the past year, as well as plans for next year and the future.

  19. EarthScope's Transportable Array: Advancing Eastward

    NASA Astrophysics Data System (ADS)

    Busby, R. W.; Vernon, F.; Newman, R. L.; Astiz, L.

    2006-12-01

    EarthScope's Transportable Array has installed more than 200 high-quality broadband seismic stations over the last 3 years in the western US. These stations have a nominal spacing of 70 km and are part of an eventual 400 station array that migrates from west to east at a rate of 18 stations per month. The full 400 stations will be operating by September 2007. Stations have a residence time of about 2 years before being relocated to the next site. Throughout the continental US, 1623 sites are expected to be occupied. Standardized procedures and protocols have been developed to streamline all aspects of Transportable Array operations, from siting to site construction and installation to equipment purchasing and data archiving. Earned Value Management tools keep facility installation and operation on budget and schedule. A diverse, yet efficient, infrastructure installs and maintains the Transportable Array. Sensors, dataloggers, and other equipment are received and tested by the IRIS PASSCAL Instrument Center and shipped to regional storage facilities. To engage future geoscientists in the project, students are trained to conduct field and analytical reconnaissance to identify suitable seismic station sites. Contract personnel are used for site verification; vault construction; and installation of sensors, power, and communications systems. IRIS staff manages permitting, landowner communications, and station operations and maintenance. Seismic signal quality and metadata are quality-checked at the Array Network Facility at the University of California-San Diego and simultaneously archived at the IRIS Data Management Center in Seattle. Station equipment has been specifically designed for low power, remote, unattended operation and uses diverse two-way IP communications for real-time transmission. Digital cellular services, VSAT satellite, and commercial DSL, cable or wireless transport services are employed. Automatic monitoring of status, signal quality and

  20. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  1. Teachers guide for building and operating weather satellite ground stations for high school science

    NASA Technical Reports Server (NTRS)

    Summers, R. J.; Gotwald, T.

    1981-01-01

    A number of colleges and universities are operating APT direct readout stations. However, high school science teachers have often failed to realize the potential of meteorological satellites and their products as unique instructional tools. The ability to receive daily pictures from these satellites offers exciting opportunities for secondary school teachers and students to assemble the electronic hardware and to view real time pictures of Earth from outer space. The station and pictures can be used in the classroom to develop an approach to science teaching that could span many scientific disciplines and offer many opportunities for student research and participation in scientific processes. This can be accomplished with relatively small expenditures of funds for equipment. In most schools some of the equipment may already be available. Others can be constructed by teachers and/or students. Yet another source might be the purchase of used equipment from industry or through the government surplus channels. The information necessary for individuals unfamiliar with these systems to construct a direct readout for receiving real time APT photographs on a daily basis in the classroom is presented.

  2. International Space Station (ISS)

    NASA Image and Video Library

    2001-02-01

    The International Space Station (ISS) Payload Operations Center (POC) at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, is the world's primary science command post for the International Space Station (ISS), the most ambitious space research facility in human history. The Payload Operations team is responsible for managing all science research experiments aboard the Station. The center is also home for coordination of the mission-plarning work of variety of international sources, all science payload deliveries and retrieval, and payload training and safety programs for the Station crew and all ground personnel. Within the POC, critical payload information from the ISS is displayed on a dedicated workstation, reading both S-band (low data rate) and Ku-band (high data rate) signals from a variety of experiments and procedures operated by the ISS crew and their colleagues on Earth. The POC is the focal point for incorporating research and experiment requirements from all international partners into an integrated ISS payload mission plan. This photograph is an overall view of the MSFC Payload Operations Center displaying the flags of the countries participating the ISS. The flags at the left portray The United States, Canada, France, Switzerland, Netherlands, Japan, Brazil, and Sweden. The flags at the right portray The Russian Federation, Italy, Germany, Belgium, Spain, United Kingdom, Denmark, and Norway.

  3. JEOS. The JANUS earth observation satellite

    NASA Astrophysics Data System (ADS)

    Molette, P.; Jouan, J.

    The JANUS multimission platform has been designed to minimize the cost of the satellite (by a maximum reuse of equipment from other proprogrammes) and of its associated launch by Aŕiane (by a piggy-back configuration optimized for Ariane 4). The paper describes the application of the JANUS platform to an Earth observation mission with the objective to provide a given country with a permanent monitoring of its earth resources by exploitation of spaceborne imagery. According to this objective, and to minimize the overall system and operational cost, the JANUS Earth Observation Satellite (JEOS) will provide a limited coverage with real time transmission of image data, thus avoiding need for on-board storage and simplifying operations. The JEOS operates on a low earth, near polar sun synchronous orbit. Launched in a piggy-back configuration on Ariane 4, with a SPOT or ERS spacecraft, it reaches its operational orbit after a drift orbit of a few weeks maximum. In its operational mode, the JEOS is 3-axis stabilised, earth pointed. After presentation of the platform, the paper describes the solid state push-broom camera which is composed of four optical lenses mounted on a highly stable optical bench. Each lens includes an optics system, reused from an on-going development, and two CCD linear arrays of detectors. The camera provides four registered channels in visible and near IR bands. The whole optical bench is supported by a rotating mechanism which allows rotation of the optical axis in the across-track direction. The JEOS typical performance for a 700 km altitude is then summarized: spatial resolution 30 m, swath width 120 km, off-track capability 325 km,… The payload data handling and transmission electronics, derived from the French SPOT satellite, realizes the processing, formatting, and transmission to the ground; this allows reuse of the standard SPOT receiving stations. The camera is only operated when the spacecraft is within the visibility of the ground

  4. Operational GPS Imaging System at Multiple Scales for Earth Science and Monitoring of Geohazards

    NASA Astrophysics Data System (ADS)

    Blewitt, Geoffrey; Hammond, William; Kreemer, Corné

    2016-04-01

    Toward scientific targets that range from slow deep Earth processes to geohazard rapid response, our operational GPS data analysis system produces smooth, yet detailed maps of 3-dimensional land motion with respect to our Earth's center of mass at multiple spatio-temporal scales with various latencies. "GPS Imaging" is implemented operationally as a back-end processor to our GPS data processing facility, which uses JPL's GIPSY OASIS II software to produce positions from 14,000 GPS stations in ITRF every 5 minutes, with coordinate precision that gradually improves as latency increases upward from 1 hour to 2 weeks. Our GPS Imaging system then applies sophisticated signal processing and image filtering techniques to generate images of land motion covering our Earth's continents with high levels of robustness, accuracy, spatial resolution, and temporal resolution. Techniques employed by our GPS Imaging system include: (1) similarity transformation of polyhedron coordinates to ITRF with optional common-mode filtering to enhance local transient signal to noise ratio, (2) a comprehensive database of ~100,000 potential step events based on earthquake catalogs and equipment logs, (3) an automatic, robust, and accurate non-parametric estimator of station velocity that is insensitive to prevalent step discontinuities, outliers, seasonality, and heteroscedasticity; (4) a realistic estimator of velocity error bars based on subsampling statistics; (5) image processing to create a map of land motion that is based on median spatial filtering on the Delauney triangulation, which is effective at despeckling the data while faithfully preserving edge features; (6) a velocity time series estimator to assist identification of transient behavior, such as unloading caused by drought, and (7) a method of integrating InSAR and GPS for fine-scale seamless imaging in ITRF. Our system is being used to address three main scientific focus areas, including (1) deep Earth processes, (2

  5. Earth Observation

    NASA Image and Video Library

    2014-06-01

    ISS040-E-006327 (1 June 2014) --- A portion of International Space Station solar array panels and Earth?s horizon are featured in this image photographed by an Expedition 40 crew member on the space station.

  6. Multi-Parameter GEOSCOPE Land Stations and Ocean Bottom Observatories

    NASA Astrophysics Data System (ADS)

    Stutzmann, E.; Roult, G.; Montagner, J.; Karczewski, J.; Geoscope Group,.

    2002-12-01

    Since the mid-eighties, the number of high quality broadband stations installed over the world has increased in a spectacular way and these stations cover now most of the emerged lands, with a higher concentration in the northern hemisphere between the latitudes 0 and 60N. The GEOSCOPE program has been the first global network of 3-component broadband seismic stations and has contributed to the elaboration of the FDSN. The 25 broadband GEOSCOPE stations fulfill the FDSN criteria, the data are stored in data-centers at the IPGP and IRIS DMC and are accessible through the netdc procedure (email to netdc@ipgp.jussieu.fr) or via the web. GEOSCOPE data have contributed to the major progresses of our knowledge of the earth interior. The earthquake CMT are now determined in a routine manner and the temporal history of the seismic source is accessible for the largest earthquakes. The geographical distribution of GEOSCOPE stations, specially in the southern hemisphere, has also played an important role in improving the resolution of global tomographic models. Recent P-wave models give high resolution images of subducted slabs whereas recent S-wave models have enable to discover the two super-swells. The evolution of the GEOSCOPE program is now focused on the installation of multi-parameter stations including 3-component broadband seismic sensors, pressure gauge, thermometer and GPS receivers. These stations will enable to decrease the seismic noise, and -among others- to better characterize the background free oscillations of the earth. The seismic station earth coverage is limited by the presence of oceans and the next step is the installation of ocean bottom broadband stations. For this purpose, in 1992, a first temporary station sismobs/OFM has been working for 2 weeks, along the mid atlantic ridge. In 1997, an international multi-parameter station, MOISE has been operating during 3 months in the Monterey Bay. The further step is the installation of the station NERO in a

  7. 47 CFR 90.1333 - Restrictions on the operation of mobile and portable stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transmitted by a base station. (b) Any mobile/portable stations may communicate with any other mobile/portable... by a base station. (c) Airborne operations by mobile/portable stations is prohibited. ... portable stations. 90.1333 Section 90.1333 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED...

  8. Reference earth orbital research and applications investigations (blue book). Volume 4: Earth observations

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The earth observations capability of the space station and space shuttle program definition is discussed. The stress in the functional program element has been to update the sensor specifications and to shift some of the emphasis from sensors to experiments to be done aboard the facility. The earth observations facility will include provisions for data acquisition, sensor control and display, data analysis, and maintenance and repair. The facility is research and development in nature with a potential for operational applications.

  9. Observations of the Earth's magnetic field from the Space Station: Measurement at high and extremely low altitude using Space Station-controlled free-flyers

    NASA Technical Reports Server (NTRS)

    Webster, W., Jr.; Frawley, J. J.; Stefanik, M.

    1984-01-01

    Simulation studies established that the main (core), crustal and electrojet components of the Earth's magnetic field can be observed with greater resolution or over a longer time-base than is presently possible by using the capabilities provided by the space station. Two systems are studied. The first, a large lifetime, magnetic monitor would observe the main field and its time variation. The second, a remotely-piloted, magnetic probe would observe the crustal field at low altitude and the electrojet field in situ. The system design and the scientific performance of these systems is assessed. The advantages of the space station are reviewed.

  10. Small space station electrical power system design concepts

    NASA Technical Reports Server (NTRS)

    Jones, G. M.; Mercer, L. N.

    1976-01-01

    A small manned facility, i.e., a small space station, placed in earth orbit by the Shuttle transportation system would be a viable, cost effective addition to the basic Shuttle system to provide many opportunities for R&D programs, particularly in the area of earth applications. The small space station would have many similarities with Skylab. This paper presents design concepts for an electrical power system (EPS) for the small space station based on Skylab experience, in-house work at Marshall Space Flight Center, SEPS (Solar Electric Propulsion Stage) solar array development studies, and other studies sponsored by MSFC. The proposed EPS would be a solar array/secondary battery system. Design concepts expressed are based on maximizing system efficiency and five year operational reliability. Cost, weight, volume, and complexity considerations are inherent in the concepts presented. A small space station EPS based on these concepts would be highly efficient, reliable, and relatively inexpensive.

  11. Microbiology operations and facilities aboard restructured Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Mishra, S. K.; Pierson, Duane L.

    1992-01-01

    With the restructure and funding changes for Space Station Freedom, the Environmental Health System (EHS)/Microbiology Subsystem revised its scheduling and operational requirements for component hardware. The function of the Microbiology Subsystem is to monitor the environmental quality of air, water, and internal surfaces and, in part, crew health on board Space Station. Its critical role shall be the identification of microbial contaminants in the environment that may cause system degradation, produce unsanitary or pathogenic conditions, or reduce crew and mission effectiveness. EHS/Microbiology operations and equipment shall be introduced in concert with a phased assembly sequence, from Man Tended Capability (MTC) through Permanently Manned Capability (PMC). Effective Microbiology operations and subsystem components will assure a safe, habitable, and useful spacecraft environment for life sciences research and long-term manned exploration.

  12. Separation of the Galactic Cosmic Rays and Inner Earth Radiation Belt Contributions to the Daily Dose Onboard the International Space Station in 2005-2011

    NASA Astrophysics Data System (ADS)

    Lishnevskii, A. E.; Benghin, V. V.

    2018-03-01

    The DB-8 detectors of the ISS radiation monitoring system (RMS) have operated almost continuously onboard the ISS service module since August 2001 till December 2014. The RMS data obtained were used for the daily monitoring of the radiation environment aboard the station. This paper considers the technique of RMS data analysis that allows one to distinguish the contributions of galactic cosmic rays and the Earth's inner radiation belt to the daily dose based on the dosimetry data obtained as a result of the station's passage in areas of the highest geomagnetic latitudes. The paper presents the results of an analysis of the dosimetry data based on this technique for 2005-2011, as well as a comparison with similar results the authors obtained previously using the technique based on an analysis of the dosimetry data obtained during station passages in the area of the South Atlantic Anomaly.

  13. Close up view of switchboard panel operator's station #1; panel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Close up view of switchboard panel operator's station #1; panel contains 1200 push-pull button switches which control poer to red, green, and white indicating lights on the model board; white lights indicate that power is off; green lights indicate that equipment (switch breaker or transformer) is off; red lights indicate that equipment is on - Thirtieth Street Station, Power Director Center, Thirtieth & Market Streets in Amtrak Railroad Station, Philadelphia, Philadelphia County, PA

  14. Space Station Freedom operations planning

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  15. Deployment of precise and robust sensors on board ISS-for scientific experiments and for operation of the station.

    PubMed

    Stenzel, Christian

    2016-09-01

    The International Space Station (ISS) is the largest technical vehicle ever built by mankind. It provides a living area for six astronauts and also represents a laboratory in which scientific experiments are conducted in an extraordinary environment. The deployed sensor technology contributes significantly to the operational and scientific success of the station. The sensors on board the ISS can be thereby classified into two categories which differ significantly in their key features: (1) sensors related to crew and station health, and (2) sensors to provide specific measurements in research facilities. The operation of the station requires robust, long-term stable and reliable sensors, since they assure the survival of the astronauts and the intactness of the station. Recently, a wireless sensor network for measuring environmental parameters like temperature, pressure, and humidity was established and its function could be successfully verified over several months. Such a network enhances the operational reliability and stability for monitoring these critical parameters compared to single sensors. The sensors which are implemented into the research facilities have to fulfil other objectives. The high performance of the scientific experiments that are conducted in different research facilities on-board demands the perfect embedding of the sensor in the respective instrumental setup which forms the complete measurement chain. It is shown that the performance of the single sensor alone does not determine the success of the measurement task; moreover, the synergy between different sensors and actuators as well as appropriate sample taking, followed by an appropriate sample preparation play an essential role. The application in a space environment adds additional challenges to the sensor technology, for example the necessity for miniaturisation, automation, reliability, and long-term operation. An alternative is the repetitive calibration of the sensors. This approach

  16. New Earth Observation Capabilities For The Commercial Sector

    NASA Technical Reports Server (NTRS)

    Stefanov, William L.

    2017-01-01

    Earth observation data collected from orbital remote sensing systems are becoming increasingly critical to the short- and long-term operations of many commercial industries including agriculture, energy exploration, environmental management, transportation, and urban planning and operations. In this panel, I will present an overview of current and planned NASA remote sensing systems for Earth observation with relevance to commercial and industrial applications. Special emphasis will be given to the International Space Station (ISS) as a platform for both commercial technology demonstration/development and operational data collection through the ISS National Laboratory.

  17. Impact of orbit modeling on DORIS station position and Earth rotation estimates

    NASA Astrophysics Data System (ADS)

    Štěpánek, Petr; Rodriguez-Solano, Carlos Javier; Hugentobler, Urs; Filler, Vratislav

    2014-04-01

    The high precision of estimated station coordinates and Earth rotation parameters (ERP) obtained from satellite geodetic techniques is based on the precise determination of the satellite orbit. This paper focuses on the analysis of the impact of different orbit parameterizations on the accuracy of station coordinates and the ERPs derived from DORIS observations. In a series of experiments the DORIS data from the complete year 2011 were processed with different orbit model settings. First, the impact of precise modeling of the non-conservative forces on geodetic parameters was compared with results obtained with an empirical-stochastic modeling approach. Second, the temporal spacing of drag scaling parameters was tested. Third, the impact of estimating once-per-revolution harmonic accelerations in cross-track direction was analyzed. And fourth, two different approaches for solar radiation pressure (SRP) handling were compared, namely adjusting SRP scaling parameter or fixing it on pre-defined values. Our analyses confirm that the empirical-stochastic orbit modeling approach, which does not require satellite attitude information and macro models, results for most of the monitored station parameters in comparable accuracy as the dynamical model that employs precise non-conservative force modeling. However, the dynamical orbit model leads to a reduction of the RMS values for the estimated rotation pole coordinates by 17% for x-pole and 12% for y-pole. The experiments show that adjusting atmospheric drag scaling parameters each 30 min is appropriate for DORIS solutions. Moreover, it was shown that the adjustment of cross-track once-per-revolution empirical parameter increases the RMS of the estimated Earth rotation pole coordinates. With recent data it was however not possible to confirm the previously known high annual variation in the estimated geocenter z-translation series as well as its mitigation by fixing the SRP parameters on pre-defined values.

  18. A simulation system for Space Station extravehicular activity

    NASA Technical Reports Server (NTRS)

    Marmolejo, Jose A.; Shepherd, Chip

    1993-01-01

    America's next major step into space will be the construction of a permanently manned Space Station which is currently under development and scheduled for full operation in the mid-1990's. Most of the construction of the Space Station will be performed over several flights by suited crew members during an extravehicular activity (EVA) from the Space Shuttle. Once fully operational, EVA's will be performed from the Space Station on a routine basis to provide, among other services, maintenance and repair operations of satellites currently in Earth orbit. Both voice recognition and helmet-mounted display technologies can improve the productivity of workers in space by potentially reducing the time, risk, and cost involved in performing EVA. NASA has recognized this potential and is currently developing a voice-controlled information system for Space Station EVA. Two bench-model helmet-mounted displays and an EVA simulation program have been developed to demonstrate the functionality and practicality of the system.

  19. Satellite-tracking and Earth dynamics research programs

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The major focus for operations during this period was the preliminary MERIT Campaign and its intensive tracking of LAGEOS for polar motion and Earth rotation studies. The data acquired from LAGEOS were used for other geophysical investigations, including studies of crustal dynamics, and Earth and ocean tides, and for the general development of precision orbit determination. The network performed regular tracking of several other retroreflector satellites including GEOS-1, GEOS-3, BE-C, and Starlette for refined determinations of station coordinates and Earth's gravity field and for studies of solid Earth dynamics.

  20. International Space Station as a Platform for Exploration Beyond Low Earth Orbit

    NASA Technical Reports Server (NTRS)

    Raftery, Michael; Woodcock, Gordon

    2010-01-01

    The International Space Station (ISS) has established a new model for the achievement of the most difficult engineering goals in space: international collaboration at the program level with competition at the level of technology. This strategic shift in management approach provides long term program stability while still allowing for the flexible evolution of technology needs and capabilities. Both commercial and government sponsored technology developments are well supported in this management model. ISS also provides a physical platform for development and demonstration of the systems needed for missions beyond low earth orbit. These new systems at the leading edge of technology require operational exercise in the unforgiving environment of space before they can be trusted for long duration missions. Systems and resources needed for expeditions can be aggregated and thoroughly tested at ISS before departure thus providing wide operational flexibility and the best assurance of mission success. We will describe representative mission profiles showing how ISS can support exploration missions to the Moon, Mars, asteroids and other potential destinations. Example missions would include humans to lunar surface and return, and humans to Mars orbit as well as Mars surface and return. ISS benefits include: international access from all major launch sites; an assembly location with crew and tools that could help prepare departing expeditions that involve more than one launch; a parking place for reusable vehicles; and the potential to add a propellant depot.

  1. Earth Observations Capabilities of the International Space Station

    NASA Astrophysics Data System (ADS)

    Eppler, Dean B.; Scott, Karen P.

    The International Space Station (ISS) is presently being assembled through the joint efforts of the United States, Russia, Canada, Japan, the European Space Agency and Brazil, and will be an orbiting, multi-use facility expected to remain on-orbit into the next decade. The orbital inclination of 51.6 degrees allows the ISS to overfly approximately 75% of the Earth's land area and approximately 95% of the Earth's population. Due to the westward precession of orbit tracks, the ISS will overfly the same location approximately every three days, with the identical lighting conditions being repeated every three months. The ISS has two basic capabilities for Earth observations: a fused silica window in the Destiny laboratory, and sites on the external truss and partner modules that accommodate external payloads. The Destiny laboratory has a window port built into its nadir facing side. The window consists of 3 panes of Corning 7940 fused silica which are approximately 56 cm in diameter, providing an approximately 51 cm clear aperture. In 1996, the ISS Program agreed to upgrade the glass in the Destiny window to a set of stringent optical performance requirements. The window has a wavefront error of 1/15 wavelength peak-to-valley over a 15.2 cm aperture relative to a reference wavelength of 632.8 nm, which will allow up to a 30 cm telescope to be flown. The flight article window was radiometrically calibrated in May of 2000, indicating that the window had better than 95% transmittance in the visible region, with a steep drop-off in the ultraviolet and a gradual drop-off in the infrared from the visible through the near and short wave infrared spectra. Utilization of the optical performance of the Destiny window requires the use of the Window Observational Research Facility (WORF). The WORF is essentially an Express rack with a 0.8 m^3 payload volume centered on the Destiny window. The payload volume provides mounting surfaces for window payload hardware, including a stiff

  2. Operator Station Design System - A computer aided design approach to work station layout

    NASA Technical Reports Server (NTRS)

    Lewis, J. L.

    1979-01-01

    The Operator Station Design System is resident in NASA's Johnson Space Center Spacecraft Design Division Performance Laboratory. It includes stand-alone minicomputer hardware and Panel Layout Automated Interactive Design and Crew Station Assessment of Reach software. The data base consists of the Shuttle Transportation System Orbiter Crew Compartment (in part), the Orbiter payload bay and remote manipulator (in part), and various anthropometric populations. The system is utilized to provide panel layouts, assess reach and vision, determine interference and fit problems early in the design phase, study design applications as a function of anthropometric and mission requirements, and to accomplish conceptual design to support advanced study efforts.

  3. 2. NORTH SIDE OF THE CONTROL STATION OPERATIONS BUILDING SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. NORTH SIDE OF THE CONTROL STATION OPERATIONS BUILDING SHOWING MISSION REVIVAL FACADE. A TELECOMMUNICATIONS BUILDING CONSTRUCTED IN THE 1980s IS ADJACENT AT PHOTO-CENTER, AND COTTAGE 111 (PRESENTLY USED AS THE HYDROGRAPHER'S OFFICE) IS VISIBLE AT PHOTORIGHT. VIEW TO SOUTH. - Bishop Creek Hydroelectric System, Control Station, Bishop Creek, Bishop, Inyo County, CA

  4. Proposal for a remotely manned space station

    NASA Technical Reports Server (NTRS)

    Minsky, Marvin

    1990-01-01

    The United States is in trouble in space. The costs of the proposed Space Station Freedom have grown beyond reach, and the present design is obsolete. The trouble has come from imagining that there are only two alternatives: manned vs. unmanned. Both choices have led us into designs that do not appear to be practical. On one side, the United States simply does not possess the robotic technology needed to operate or assemble a sophisticated unmanned space station. On the other side, the manned designs that are now under way seem far too costly and dangerous, with all of its thousands of extravehicular activity (EVA) hours. More would be accomplished at far less cost by proceeding in a different way. The design of a space station made of modular, Erector Set-like parts is proposed which is to be assembled using earth-based remotely-controlled binary-tree telerobots. Earth-based workers could be trained to build the station in space using simulators. A small preassembled spacecraft would be launched with a few telerobots, and then, telerobots could be ferried into orbit along with stocks of additional parts. Trained terrestrial workers would remotely assemble a larger station, and materials for additional power and life support systems could be launched. Finally, human scientists and explorers could be sent to the space station. Other aspects of such a space station program are discussed.

  5. 75 FR 2164 - Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-293; NRC-2010-0010] Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station; Environmental Assessment and Finding of No Significant Impact The U.S... Entergy Nuclear Operations, Inc. (Entergy or the licensee), for operation of Pilgrim Nuclear Power Station...

  6. Space station operations task force. Panel 2 report: Ground operations and support systems

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Ground Operations Concept embodied in this report provides for safe multi-user utilization of the Space Station, eases user integration, and gives users autonomy and flexibility. It provides for meaningful multi-national participation while protecting U.S. interests. The concept also supports continued space operations technology development by maintaining NASA expertise and enabling technology evolution. Given attention here are pre/post flight operations, logistics, sustaining engineering/configuration management, transportation services/rescue, and information systems and communication.

  7. 47 CFR 90.157 - Discontinuance of station operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Discontinuance of station operation. 90.157 Section 90.157 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Applications and Authorizations § 90.157 Discontinuance of...

  8. 78 FR 61400 - Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station, Issuance of Director's Decision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... Nuclear Operations, Inc., Pilgrim Nuclear Power Station, Issuance of Director's Decision Notice is hereby... ML102210411, respectively), concerns the operation of Pilgrim Nuclear Power Station (Pilgrim), owned by...) inaccessible cables at Pilgrim Nuclear Power Station (Pilgrim) are capable of performing their required...

  9. Technology assessment of space stations

    NASA Technical Reports Server (NTRS)

    Coates, V. T.

    1971-01-01

    The social impacts, both beneficial and detrimental, which can be expected from a system of space stations operating over relatively long periods of time in Earth orbit, are examined. The survey is an exercise in technology assessment. It is futuristic in nature. It anticipates technological applications which are still in the planning stage, and many of the conclusions are highly speculative and for this reason controversial.

  10. International Space Station operations: New dimensions - October 13, 1987

    NASA Technical Reports Server (NTRS)

    Paules, Granville E.; Lyman, Peter; Shelley, Carl B.

    1987-01-01

    One of the principal goals of the participants in the International Space Station program is to provide a management support structure which is equitable and fair to all participants, responsive to the needs of users, responsible to other partners, and mutually supportive to the participation of other partners. Shared-utilization, shared-cost, and shared-operations policies considerations are discussed. Special attention is given to the methodology for identifying costs and benefits of this program, in which each partner should be provided with benefits in proportion to his contribution, and no partner would be forced to share in cost the inefficiencies introduced by other partners. The Space Station hierarchy of operations functions are identified, and the recommended framework planning and control hierarchy is presented.

  11. 78 FR 14952 - Earth Stations Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit Space Stations AGENCY... geostationary satellites in the fixed-satellite service on a primary basis. This proposed footnote would grant... licensees and operators, and thus are unable to estimate the number of geostationary space station licensees...

  12. 47 CFR 87.45 - Time in which station is placed in operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.45 Time in which station is placed..., excluding radionavigation land test stations. When a new license has been issued or additional operating...

  13. Expedition Earth and Beyond: Using Crew Earth Observation Imagery from the International Space Station to Facilitate Student-Led Authentic Research

    NASA Technical Reports Server (NTRS)

    Graff, P. V.; Stefanov, W. L.; Willis, K. J.; Runco, S.

    2012-01-01

    Student-led authentic research in the classroom helps motivate students in science, technology, engineering, and mathematics (STEM) related subjects. Classrooms benefit from activities that provide rigor, relevance, and a connection to the real world. Those real world connections are enhanced when they involve meaningful connections with NASA resources and scientists. Using the unique platform of the International Space Station (ISS) and Crew Earth Observation (CEO) imagery, the Expedition Earth and Beyond (EEAB) program provides an exciting way to enable classrooms in grades 5-12 to be active participants in NASA exploration, discovery, and the process of science. EEAB was created by the Astromaterials Research and Exploration Science (ARES) Education Program, at the NASA Johnson Space Center. This Earth and planetary science education program has created a framework enabling students to conduct authentic research about Earth and/or planetary comparisons using the captivating CEO images being taken by astronauts onboard the ISS. The CEO payload has been a science payload onboard the ISS since November 2000. ISS crews are trained in scientific observation of geological, oceanographic, environmental, and meteorological phenomena. Scientists on the ground select and periodically update a series of areas to be photographed as part of the CEO science payload.

  14. International Space Station (ISS)

    NASA Image and Video Library

    2006-09-17

    This view of the International Space Station, back dropped against the blackness of space and Earth, was taken shortly after the Space Shuttle Atlantis undocked from the orbital outpost at 7:50 a.m. CDT during the STS-115 mission. The unlinking completed after six days, two hours and two minutes of joint operations of the installation of the P3/P4 truss. The new 17 ton truss included batteries, electronics, a giant rotating joint, and sported a second pair of 240-foot solar wings. The new solar arrays will eventually double the onboard power of the Station when their electrical systems are brought online during the next shuttle flight, STS-116.

  15. Operations planning for Space Station Freedom - And beyond

    NASA Technical Reports Server (NTRS)

    Gibson, Stephen S.; Martin, Thomas E.; Durham, H. J.

    1992-01-01

    The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

  16. International Space Station (ISS)

    NASA Image and Video Library

    2000-02-01

    The International Space Station (ISS) Payload Operations Center (POC) at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, is the world's primary science command post for the (ISS), the most ambitious space research facility in human history. The Payload Operations team is responsible for managing all science research experiments aboard the Station. The center is also home for coordination of the mission-plarning work of variety of international sources, all science payload deliveries and retrieval, and payload training and safety programs for the Station crew and all ground personnel. Within the POC, critical payload information from the ISS is displayed on a dedicated workstation, reading both S-band (low data rate) and Ku-band (high data rate) signals from a variety of experiments and procedures operated by the ISS crew and their colleagues on Earth. The POC is the focal point for incorporating research and experiment requirements from all international partners into an integrated ISS payload mission plan. This photograph is an overall view of the MSFC Payload Operations Center displaying the flags of the countries participating in the ISS. The flags at the left portray The United States, Canada, France, Switzerland, Netherlands, Japan, Brazil, and Sweden. The flags at the right portray The Russian Federation, Italy, Germany, Belgium, Spain, United Kingdom, Denmark, and Norway.

  17. An examination of automation and robotics in the context of Space Station operations

    NASA Technical Reports Server (NTRS)

    Criswell, David R.; Lee, Douglas S.; Ragusa, James; Starks, Scott A.; Woodruff, John; Paules, Granville

    1988-01-01

    A NASA-sponsored review of Space Station automation and robotics (A&R) applications from an operations and utilization perspective is presented. The goals of the A&R panel and this report are to identify major suggestions for advanced A&R operations application in Space Station as well as key technologies that have emerged or gained prominence since the completion of previous reports; to review and incorporate the range of possible Space Station A&R applications into a framework for evaluation of A&R opportunities; and to propose incentives for the government, work packages, and subcontractors to more aggressively identify, evaluate, and incorporate advanced A&R in Space Station Operations. The suggestions for A&R focused on narrow objectives using a conservative approach tuned to Space Station at IOC and limiting the Station's growth capabilities. A more aggressive stance is to identify functional needs over the Program's life, exploit and leverage available technology, and develop the key advanced technologies permitting effective use of A&R. The challenge is to systematically identify candidate functions to be automated, provide ways to create solutions resulting in savings or increased capabilities, and offer incentives that will promote the automation.

  18. 47 CFR 87.171 - Class of station symbols.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... systems AXO—Aeronautical operational fixed DGP—Differential GPS DLT—Aircraft data link land test FA...—Radionavigation land test RLW—Microwave landing system RNV—Radio Navigation Land/DME RPC—Ramp Control TJ—Aircraft earth station in the Aeronautical Mobile-Satellite Service UAT—Universal Access Transceiver [53 FR 28940...

  19. Functional design for operational earth resources ground data processing

    NASA Technical Reports Server (NTRS)

    Baldwin, C. J. (Principal Investigator); Bradford, L. H.; Hutson, D. E.; Jugle, D. R.

    1972-01-01

    The author has identified the following significant results. Study emphasis was on developing a unified concept for the required ground system, capable of handling data from all viable acquisition platforms and sensor groupings envisaged as supporting operational earth survey programs. The platforms considered include both manned and unmanned spacecraft in near earth orbit, and continued use of low and high altitude aircraft. The sensor systems include both imaging and nonimaging devices, operated both passively and actively, from the ultraviolet to the microwave regions of the electromagnetic spectrum.

  20. Engineering challenges of operating year-round portable seismic stations at high-latitude

    NASA Astrophysics Data System (ADS)

    Beaudoin, Bruce; Carpenter, Paul; Hebert, Jason; Childs, Dean; Anderson, Kent

    2017-04-01

    Remote portable seismic stations are, in most cases, constrained by logistics and cost. High latitude operations introduce environmental, technical and logistical challenges that require substantially more engineering work to ensure robust, high quality data return. Since 2006, IRIS PASSCAL has been funded by NSF to develop, deploy, and maintain a pool of polar specific seismic stations. Here, we describe our latest advancements to mitigate the challenges of high-latitude, year-round station operation. The IRIS PASSCAL program has supported high-latitude deployments since the late 1980s. These early deployments were largely controlled source, summer only experiments. In early 2000 PASSCAL users began proposing year-round deployments of broadband stations in some of the harshest environments on the planet. These early year-round deployments were stand-alone (no telemetry) stations largely designed to operate during summer months and then run as long as possible during the winter with hopes the stations would revive come following summer. In 2006 and in collaboration with UNAVCO, we began developing communications, power systems, and enclosures to extend recording to year-round. Since this initial effort, PASSCAL continued refinement to power systems, enclosure design and manufacturability, and real-time data communications. Several sensor and data logger manufacturers have made advances in cold weather performance and delivered newly designed instruments that have furthered our ability to successfully run portable stations at high-latitude with minimal logistics - reducing size and weight of instruments and infrastructure. All PASSCAL polar engineering work is openly shared through our website: www.passcal.nmt.edu/content/polar

  1. Commercial Development Plan for the International Space Station

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The long term objective of the development plan for the International Space Station (ISS) is to establish the foundation for a marketplace and stimulate a national economy for space products and services in low-Earth orbit, where both demand and supply are dominated by the private sector. The short term objective is to begin the transition to private investment and offset a share of the public cost for operating the space shuttle fleet and space station through commercial enterprise in open markets.

  2. A shared-world conceptual model for integrating space station life sciences telescience operations

    NASA Technical Reports Server (NTRS)

    Johnson, Vicki; Bosley, John

    1988-01-01

    Mental models of the Space Station and its ancillary facilities will be employed by users of the Space Station as they draw upon past experiences, perform tasks, and collectively plan for future activities. The operational environment of the Space Station will incorporate telescience, a new set of operational modes. To investigate properties of the operational environment, distributed users, and the mental models they employ to manipulate resources while conducting telescience, an integrating shared-world conceptual model of Space Station telescience is proposed. The model comprises distributed users and resources (active elements); agents who mediate interactions among these elements on the basis of intelligent processing of shared information; and telescience protocols which structure the interactions of agents as they engage in cooperative, responsive interactions on behalf of users and resources distributed in space and time. Examples from the life sciences are used to instantiate and refine the model's principles. Implications for transaction management and autonomy are discussed. Experiments employing the model are described which the authors intend to conduct using the Space Station Life Sciences Telescience Testbed currently under development at Ames Research Center.

  3. Telescience Operations on International Space Station

    NASA Technical Reports Server (NTRS)

    Schubert, Kathleen E.

    1999-01-01

    This paper describes the concept of telescience operations for the International Space Station (ISS). The extended duration microgravity environment of the ISS will enable microgravity science research to enter into a new era of increased scientific and technological data return. The National Aeronautics and Space Administration (NASA) has a vision of distributed ground operations which enables the Principal Investigator direct interaction with his/her on-board experiment from his/her home location. This is the concept of telescience and is essential for maximizing the use of the long duration science environment that ISS provides. The goal of telescience is to provide the capability to fully tele-operate an experiment from any ground location in such a way as to increase the amount and quality of scientific and technological data return and decrease the operations cost of an individual experiment relative to the era of Space Shuttle experiments. This paper also describes the NASA Lewis Research Center (LeRC) implementation approach for the LeRC Telescience Support Center (TSC) and Principal Investigator Science Operations Sites (SOS) which will fully meet the concept of telescience as prescribed by the Agency.

  4. Distributed operating system for NASA ground stations

    NASA Technical Reports Server (NTRS)

    Doyle, John F.

    1987-01-01

    NASA ground stations are characterized by ever changing support requirements, so application software is developed and modified on a continuing basis. A distributed operating system was designed to optimize the generation and maintenance of those applications. Unusual features include automatic program generation from detailed design graphs, on-line software modification in the testing phase, and the incorporation of a relational database within a real-time, distributed system.

  5. Using Spacelab as a precursor of science operations for the Space Station

    NASA Technical Reports Server (NTRS)

    Marmann, R. A.

    1997-01-01

    For more than 15 years, Spacelab, has provided a laboratory in space for an international array of experiments, facilities, and experimenters. In addition to continuing this important work, Spacelab is now serving as a crucial stepping-stone to the improved science, improved operations, and rapid access to space that will characterize International Space Station. In the Space Station era, science operations will depend primarily on distributed/remote operations that will allow investigators to direct science activities from their universities, facilities, or home bases. Spacelab missions are a crucial part of preparing for these activities, having been used to test, prove, and refine remote operations over several missions. The knowledge gained from preparing these Missions is also playing a crucial role in reducing the time required to put an experiment into orbit, from revolutionizing the processes involved to testing the hardware needed for these more advanced operations. This paper discusses the role of the Spacelab program and the NASA Marshall Space Flight Center- (MSFC-) managed missions in developing and refining remote operations, new hardware and facilities for use on Space Station, and procedures that dramatically reduce preparation time for flight.

  6. FUEL CELL OPERATION ON LANDFILL GAS AT PENROSE POWER STATION

    EPA Science Inventory

    This demonstration test successfully demonstrated operation of a commercial phosphoric acid fuel cell (FC) on landfill gas (LG) at the Penrose Power Station in Sun Valley, CA. Demonstration output included operation up to 137 kW; 37.1% efficiency at 120 kW; exceptionally low sec...

  7. Operation of hydrologic data collection stations by the U.S. Geological Survey in 1987

    USGS Publications Warehouse

    Condes de la Torre, Alberto

    1987-01-01

    The U.S. Geological Survey operates hydrologic data collection stations nationwide which serve the needs of all levels of government, the private sector, and the general public, for water resources information. During fiscal year 1987, surface water discharge was determined at 10,624 stations; stage data on streams, reservoirs, and lakes were recorded at 1,806 stations; and various surface water quality characteristics were determined at 2,901 stations. In addition, groundwater levels were measured at 32,588 stations, and the quality of groundwater was determined at 9,120 stations. Data on sediment were collected daily at 174 stations and on a periodic basis at 878 stations. Information on precipitation quantity was collected at 909 stations, and the quality of precipitation was analyzed at 78 stations. Data collection platforms for satellite telemetry of hydrologic information were used at 2,292 Geological Survey stations. Funding for the hydrologic stations was derived, either solely or from a combination, from three major sources - the Geological Survey 's Federal Program appropriation, the Federal-State Cooperative Program, and reimbursements from other Federal agencies. The number of hydrologic stations operated by the Geological Survey declined from fiscal year 1983 to 1987. The number of surface water discharge stations were reduced by 452 stations; surface water quality stations declined by 925 stations; groundwater level stations declined by 1,051 stations; while groundwater quality stations increased by 1,472 stations. (Author 's abstract)

  8. Earth aeolian wind streaks: Comparison to wind data from model and stations

    NASA Astrophysics Data System (ADS)

    Cohen-Zada, A. L.; Maman, S.; Blumberg, D. G.

    2017-05-01

    Wind streak is a collective term for a variety of aeolian features that display distinctive albedo surface patterns. Wind streaks have been used to map near-surface winds and to estimate atmospheric circulation patterns on Mars and Venus. However, because wind streaks have been studied mostly on Mars and Venus, much of the knowledge regarding the mechanism and time frame of their formation and their relationship to the atmospheric circulation cannot be verified. This study aims to validate previous studies' results by a comparison of real and modeled wind data with wind streak orientations as measured from remote-sensing images. Orientations of Earth wind streaks were statistically correlated to resultant drift direction (RDD) values calculated from reanalysis and wind data from 621 weather stations. The results showed good agreement between wind streak orientations and reanalysis RDD (r = 0.78). A moderate correlation was found between the wind streak orientations and the weather station data (r = 0.47); a similar trend was revealed on a regional scale when the analysis was performed by continent, with r ranging from 0.641 in North America to 0.922 in Antarctica. At sites where wind streak orientations did not correspond to the RDDs (i.e., a difference of 45°), seasonal and diurnal variations in the wind flow were found to be responsible for deviation from the global pattern. The study thus confirms that Earth wind streaks were formed by the present wind regime and they are indeed indicative of the long-term prevailing wind direction on global and regional scales.

  9. The JPL telerobot operator control station. Part 2: Software

    NASA Technical Reports Server (NTRS)

    Kan, Edwin P.; Landell, B. Patrick; Oxenberg, Sheldon; Morimoto, Carl

    1989-01-01

    The Operator Control Station of the Jet Propulsion Laboratory (JPL)/NASA Telerobot Demonstrator System provides the man-machine interface between the operator and the system. It provides all the hardware and software for accepting human input for the direct and indirect (supervised) manipulation of the robot arms and tools for task execution. Hardware and software are also provided for the display and feedback of information and control data for the operator's consumption and interaction with the task being executed. The software design of the operator control system is discussed.

  10. Human Error and the International Space Station: Challenges and Triumphs in Science Operations

    NASA Technical Reports Server (NTRS)

    Harris, Samantha S.; Simpson, Beau C.

    2016-01-01

    Any system with a human component is inherently risky. Studies in human factors and psychology have repeatedly shown that human operators will inevitably make errors, regardless of how well they are trained. Onboard the International Space Station (ISS) where crew time is arguably the most valuable resource, errors by the crew or ground operators can be costly to critical science objectives. Operations experts at the ISS Payload Operations Integration Center (POIC), located at NASA's Marshall Space Flight Center in Huntsville, Alabama, have learned that from payload concept development through execution, there are countless opportunities to introduce errors that can potentially result in costly losses of crew time and science. To effectively address this challenge, we must approach the design, testing, and operation processes with two specific goals in mind. First, a systematic approach to error and human centered design methodology should be implemented to minimize opportunities for user error. Second, we must assume that human errors will be made and enable rapid identification and recoverability when they occur. While a systematic approach and human centered development process can go a long way toward eliminating error, the complete exclusion of operator error is not a reasonable expectation. The ISS environment in particular poses challenging conditions, especially for flight controllers and astronauts. Operating a scientific laboratory 250 miles above the Earth is a complicated and dangerous task with high stakes and a steep learning curve. While human error is a reality that may never be fully eliminated, smart implementation of carefully chosen tools and techniques can go a long way toward minimizing risk and increasing the efficiency of NASA's space science operations.

  11. The Operations Security Concept for Future ESA Earth Observation Missions

    NASA Astrophysics Data System (ADS)

    Fischer, D.; Bargellini, P.; Merri, M.

    2008-08-01

    Next-generation European earth observation missions will play a critical role in public safety and security infrastructures. This makes it necessary for ESA to protect the communication infrastructure of these missions in order to guarantee their service availability. In this paper, we discuss the development process for a generic earth observation security concept. This concept has been developed as part of a GMES Flight Operation Segment security study with the objective to analyse and select a number of high level security requirements for the missions. Further, we studied the impact of an implementation for these requirements on the operational infrastructure of current earth observation missions.

  12. Broadening the Quality and Capabilities of the EarthScope Alaska Transportable Array

    NASA Astrophysics Data System (ADS)

    Busby, R. W.

    2016-12-01

    In 2016, the EarthScope Transportable Array (TA) program will have 195 broadband seismic stations operating in Alaska and western Canada. This ambitious project will culminate in a network of 268 new or upgraded real-time seismic stations operating through 2019. The challenging environmental conditions and the remoteness of Alaska have motivated a new method for constructing a high-quality, temporary seismic network. The Alaska TA station design builds on experience of the Lower 48 TA deployment and adds design requirements because most stations are accessible only by helicopter. The stations utilize new high-performance posthole sensors, a specially built hammer/auger drill, and lightweight lithium ion batteries to minimize sling loads. A uniform station design enables a modest crew to build the network on a short timeline and operate them through the difficult conditions of rural Alaska. The Alaska TA deployment has increased the quality of seismic data, with some well-sited 2-3 m posthole stations approaching the performance of permanent Global Seismic Network stations emplaced in 100 m boreholes. The real-time data access, power budget, protective enclosure and remote logistics of these TA stations has attracted collaborations with NASA, NOAA, USGS, AVO and other organizations to add auxiliary sensors to the suite of instruments at many TA stations. Strong motion sensors have been added to (18) stations near the subduction trench to complement SM stations operated by AEC, ANSS and GSN. All TA and most upgraded stations have pressure and infrasound sensors, and 150 TA stations are receiving a Vaisala weather sensor, supplied by the National Weather Service Alaska Region and NASA, capable of measuring temperature, pressure, relative humidity, wind speed/direction, and precipitation intensity. We are also installing about (40) autonomous soil temperature profile kits adjacent to northern stations. While the priority continues to be collecting seismic data, these

  13. 47 CFR 25.117 - Modification of station license.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... application by the Commission. (b) Both earth station and space station modification applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the... earth station or space station authorization, must include a verified statement from the applicant: (1...

  14. 75 FR 38147 - FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-01

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-346; NRC-2010-0240] FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption 1.0 Background FirstEnergy Nuclear Operating Company... of the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). The license provides, among other things...

  15. 75 FR 80549 - FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-346; NRC-2010-0378] FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Exemption 1.0 Background FirstEnergy Nuclear Operating Company... of the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). The license provides, among other things...

  16. Space station structures and dynamics test program

    NASA Technical Reports Server (NTRS)

    Moore, Carleton J.; Townsend, John S.; Ivey, Edward W.

    1987-01-01

    The design, construction, and operation of a low-Earth orbit space station poses unique challenges for development and implementation of new technology. The technology arises from the special requirement that the station be built and constructed to function in a weightless environment, where static loads are minimal and secondary to system dynamics and control problems. One specific challenge confronting NASA is the development of a dynamics test program for: (1) defining space station design requirements, and (2) identifying the characterizing phenomena affecting the station's design and development. A general definition of the space station dynamic test program, as proposed by MSFC, forms the subject of this report. The test proposal is a comprehensive structural dynamics program to be launched in support of the space station. The test program will help to define the key issues and/or problems inherent to large space structure analysis, design, and testing. Development of a parametric data base and verification of the math models and analytical analysis tools necessary for engineering support of the station's design, construction, and operation provide the impetus for the dynamics test program. The philosophy is to integrate dynamics into the design phase through extensive ground testing and analytical ground simulations of generic systems, prototype elements, and subassemblies. On-orbit testing of the station will also be used to define its capability.

  17. Environmental interactions of the Space Station Freedom electric power system

    NASA Technical Reports Server (NTRS)

    Nahra, Henry K.; Lu, Cheng-Yi

    1991-01-01

    The Space Station Freedom operates in a low earth orbit (LEO) environment. Such operation results in different potential interactions with the Space Station systems including the Electric Power System (EPS). These potential interactions result in environmental effects which include neutral species effects such as atomic oxygen erosion, effects of micrometeoroid and orbital debris impacts, plasma effects, ionizing radiation, and induced contamination degradation effects. The EPS design and its interactions with the LEO environment are briefly described and the results of analyses and testing programs planned and performed thus far to resolve environmental concerns related to the EPS and its function in LEO environment.

  18. Propagation Velocity of Solid Earth Tides

    NASA Astrophysics Data System (ADS)

    Pathak, S.

    2017-12-01

    One of the significant considerations in most of the geodetic investigations is to take into account the outcome of Solid Earth tides on the location and its consequent impact on the time series of coordinates. In this research work, the propagation velocity resulting from the Solid Earth tides between the Indian stations is computed. Mean daily coordinates for the stations have been computed by applying static precise point positioning technique for a day. The computed coordinates are used as an input for computing the tidal displacements at the stations by Gravity method along three directions at 1-minute interval for 24 hours. Further the baseline distances are computed between four Indian stations. Computation of the propagation velocity for Solid Earth tides can be done by the virtue of study of the concurrent effect of it in-between the stations of identified baseline distance along with the time consumed by the tides for reaching from one station to another. The propagation velocity helps in distinguishing the impact at any station if the consequence at a known station for a specific time-period is known. Thus, with the knowledge of propagation velocity, the spatial and temporal effects of solid earth tides can be estimated with respect to a known station. As theoretically explained, the tides generated are due to the position of celestial bodies rotating about Earth. So the need of study is to observe the correlation of propagation velocity with the rotation speed of the Earth. The propagation velocity of Solid Earth tides comes out to be in the range of 440-470 m/s. This velocity comes out to be in a good agreement with the Earth's rotation speed.

  19. The Satellite Nuclear Power Station - An option for future power generation.

    NASA Technical Reports Server (NTRS)

    Williams, J. R.; Clement, J. D.

    1973-01-01

    A new concept in nuclear power generation is being explored which essentially eliminates major objections to nuclear power. The Satellite Nuclear Power Station, remotely operated in synchronous orbit, would transmit power safely to the ground by a microwave beam. Fuel reprocessing would take place in space and no radioactive materials would ever be returned to earth. Even the worst possible accident to such a plant should have negligible effect on the earth. An exploratory study of a satellite nuclear power station to provide 10,000 MWe to the earth has shown that the system could weigh about 20 million pounds and cost less than $1000/KWe. An advanced breeder reactor operating with an MHD power cycle could achieve an efficiency of about 50% with a 1100 K radiator temperature. If a hydrogen moderated gas core reactor is used, its breeding ratio of 1.10 would result in a fuel doubling time of a few years. A rotating fluidized bed or NERVA type reactor might also be used. The efficiency of power transmission from synchronous orbit would range from 70% to 80%.

  20. Space Station Simulation Computer System (SCS) study for NASA/MSFC. Operations concept report

    NASA Technical Reports Server (NTRS)

    1990-01-01

    NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is made up of computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

  1. Enhanced science capability on the International Space Station

    NASA Astrophysics Data System (ADS)

    Felice, Ronald R.; Kienlen, Mike

    2002-12-01

    It is inevitable that the International Space Station (ISS) will play a significant role in the conduct of science in space. However, in order to provide this service to a wide and broad community and to perform it cost effectively, alternative concepts must be considered to complement NASA"s Institutional capability. Currently science payload forward and return data services must compete for higher priority ISS infrastructure support requirements. Furthermore, initial astronaut crews will be limited to a single shift. Much of their time and activities will be required to meet their physical needs (exercise, recreation, etc.), station maintenance, and station operations, leaving precious little time to actively conduct science payload operations. ISS construction plans include the provisioning of several truss mounted, space-hardened pallets, both zenith and nadir facing. The ISS pallets will provide a platform to conduct both earth and space sciences. Additionally, the same pallets can be used for life and material sciences, as astronauts could place and retrieve sealed canisters for long-term micro-gravity exposure. Thus the pallets provide great potential for enhancing ISS science return. This significant addition to ISS payload capacity has the potential to exacerbate priorities and service contention factors within the exiting institution. In order to have it all, i.e., more science and less contention, the pallets must be data smart and operate autonomously so that NASA institutional services are not additionally taxed. Specifically, the "Enhanced Science Capability on the International Space Station" concept involves placing data handling and spread spectrum X-band communications capabilities directly on ISS pallets. Spread spectrum techniques are considered as a means of discriminating between different pallets as well as to eliminate RFI. The data and RF systems, similar to that of "free flyers", include a fully functional command and data handling system

  2. International Space Station (ISS)

    NASA Image and Video Library

    2002-07-10

    This is a photo of soybeans growing in the Advanced Astroculture (ADVASC) Experiment aboard the International Space Station (ISS). The ADVASC experiment was one of the several new experiments and science facilities delivered to the ISS by Expedition Five aboard the Space Shuttle Orbiter Endeavor STS-111 mission. An agricultural seed company will grow soybeans in the ADVASC hardware to determine whether soybean plants can produce seeds in a microgravity environment. Secondary objectives include determination of the chemical characteristics of the seed in space and any microgravity impact on the plant growth cycle. Station science will also be conducted by the ever-present ground crew, with a new cadre of controllers for Expedition Five in the ISS Payload Operations Control Center (POCC) at NASA's Marshall Space Flight Center in Huntsville, Alabama. Controllers work in three shifts around the clock, 7 days a week, in the POCC, the world's primary science command post for the Space Station. The POCC links Earth-bound researchers around the world with their experiments and crew aboard the Space Station.

  3. International Space Station (ISS)

    NASA Image and Video Library

    2002-07-10

    Expedition Five crewmember and flight engineer Peggy Whitson displays the progress of soybeans growing in the Advanced Astroculture (ADVASC) Experiment aboard the International Space Station (ISS). The ADVASC experiment was one of the several new experiments and science facilities delivered to the ISS by Expedition Five aboard the Space Shuttle Orbiter Endeavor STS-111 mission. An agricultural seed company will grow soybeans in the ADVASC hardware to determine whether soybean plants can produce seeds in a microgravity environment. Secondary objectives include determination of the chemical characteristics of the seed in space and any microgravity impact on the plant growth cycle. Station science will also be conducted by the ever-present ground crew, with a new cadre of controllers for Expedition Five in the ISS Payload Operations Control Center (POCC) at NASA's Marshall Space Flight Center in Huntsville, Alabama. Controllers work in three shifts around the clock, 7 days a week, in the POCC, the world's primary science command post for the Space Station. The POCC links Earth-bound researchers around the world with their experiments and crew aboard the Space Station.

  4. SAMPIE Measurements of the Space Station Plasma Current Analyzed

    NASA Technical Reports Server (NTRS)

    1996-01-01

    In March of 1994, STS-62 carried the NASA Lewis Research Center's Solar Array Module Plasma Interactions Experiment (SAMPIE) into orbit, where it investigated the plasma current collected and the arcs from solar arrays and other space power materials immersed in the low-Earth-orbit space plasma. One of the important experiments conducted was the plasma current collected by a four-cell coupon sample of solar array cells for the international space station. The importance of this experiment dates back to the 1990 and 1991 meetings of the Space Station Electrical Grounding Tiger Team. The Tiger Team determined that unless the electrical potentials on the space station structure were actively controlled via a plasma contactor, the space station structure would arc into the plasma at a rate that would destroy the thermal properties of its surface coatings in only a few years of operation. The space station plasma contactor will control its potentials by emitting electrons into the surrounding low-Earth-orbit plasma at the same rate that they are collected by the solar arrays. Thus, the level at which the space station solar arrays can collect current is very important in verifying that the plasma contactor design can do its job.

  5. International Space Station Payload Operations Integration Center (POIC) Overview

    NASA Technical Reports Server (NTRS)

    Ijames, Gayleen N.

    2012-01-01

    Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).

  6. Control system for, and a method of, heating an operator station of a work machine

    DOEpatents

    Baker, Thomas M.; Hoff, Brian D.; Akasam, Sivaprasad

    2005-04-05

    There are situations in which an operator remains in an operator station of a work machine when an engine of the work machine is inactive. The present invention includes a control system for, and a method of, heating the operator station when the engine is inactive. A heating system of the work machine includes an electrically-powered coolant pump, a power source, and at least one piece of warmed machinery. An operator heat controller is moveable between a first and a second position, and is operable to connect the electrically-powered coolant pump to the power source when the engine is inactive and the operator heat controller is in the first position. Thus, by deactivating the engine and then moving the operator heat controller to the first position, the operator may supply electrical energy to the electrically-powered coolant pump, which is operably coupled to heat the operator station.

  7. 10. VIEW WITHIN THE EAST OPERATING GALLERY OF WORK STATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. VIEW WITHIN THE EAST OPERATING GALLERY OF WORK STATION WITH MANIPULATOR ARMS. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV

  8. System Operations Studies for Automated Gateway Transit Systems - Detailed Station Model Programmer's Manual.

    DOT National Transportation Integrated Search

    1982-01-01

    The Detailed Station Model (DSM) provides operational and performance measures of alternative station configurations and management policies with respect to vehicle and passenger capabilities. It provides an analytic tool to support tradeoff studies ...

  9. The International Space Station: Operations and Assembly - Learning From Experiences - Past, Present, and Future

    NASA Technical Reports Server (NTRS)

    Fuller, Sean; Dillon, William F.

    2006-01-01

    As the Space Shuttle continues flight, construction and assembly of the International Space Station (ISS) carries on as the United States and our International Partners resume the building, and continue to carry on the daily operations, of this impressive and historical Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America s space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. Since the launch and joining of the first two elements in 1998, the ISS and the partnership have experienced and overcome many challenges to assembly and operations, along with accomplishing many impressive achievements and historical firsts. These experiences and achievements over time have shaped our strategy, planning, and expectations. The continual operation and assembly of ISS leads to new knowledge about the design, development and operation of systems and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration and to generate the data and information that will enable our programs to return to the Moon and continue on to Mars. This paper will provide an overview of the complexity of the ISS Program, including a historical review of the major assembly events and operational milestones of the program, along with the upcoming assembly plans and scheduled missions of the space shuttle flights and ISS Assembly sequence.

  10. Orbital Boom Sensor System with a cloudy Earth limb

    NASA Image and Video Library

    2005-07-28

    S114-E-5712 (28 July 2005) --- This view of the Orbital Boom Sensor System, backdropped by clouds and Earth’s limb, was taken by the STS-114 crew during approach and docking operations with the international space station.

  11. Mission Operations of Earth Observing-1 with Onboard Autonomy

    NASA Technical Reports Server (NTRS)

    Rabideau, Gregg; Tran, Daniel Q.; Chien, Steve; Cichy, Benjamin; Sherwood, Rob; Mandl, Dan; Frye, Stuart; Shulman, Seth; Szwaczkowski, Joseph; Boyer, Darrell; hide

    2006-01-01

    Space mission operations are extremely labor and knowledge-intensive and are driven by the ground and flight systems. Inclusion of an autonomy capability can have dramatic effects on mission operations. We describe the past mission operations flow for the Earth Observing-1 (EO-1) spacecraft as well as the more autonomous operations to which we transferred as part of the Autonomous Sciencecraft Experiment (ASE).

  12. Data Access and Web Services at the EarthScope Plate Boundary Observatory

    NASA Astrophysics Data System (ADS)

    Matykiewicz, J.; Anderson, G.; Henderson, D.; Hodgkinson, K.; Hoyt, B.; Lee, E.; Persson, E.; Torrez, D.; Smith, J.; Wright, J.; Jackson, M.

    2007-12-01

    The EarthScope Plate Boundary Observatory (PBO) at UNAVCO, Inc., part of the NSF-funded EarthScope project, is designed to study the three-dimensional strain field resulting from deformation across the active boundary zone between the Pacific and North American plates in the western United States. To meet these goals, PBO will install 880 continuous GPS stations, 103 borehole strainmeter stations, and five laser strainmeters, as well as manage data for 209 previously existing continuous GPS stations and one previously existing laser strainmeter. UNAVCO provides access to data products from these stations, as well as general information about the PBO project, via the PBO web site (http://pboweb.unavco.org). GPS and strainmeter data products can be found using a variety of access methods, incuding map searches, text searches, and station specific data retrieval. In addition, the PBO construction status is available via multiple mapping interfaces, including custom web based map widgets and Google Earth. Additional construction details can be accessed from PBO operational pages and station specific home pages. The current state of health for the PBO network is available with the statistical snap-shot, full map interfaces, tabular web based reports, and automatic data mining and alerts. UNAVCO is currently working to enhance the community access to this information by developing a web service framework for the discovery of data products, interfacing with operational engineers, and exposing data services to third party participants. In addition, UNAVCO, through the PBO project, provides advanced data management and monitoring systems for use by the community in operating geodetic networks in the United States and beyond. We will demonstrate these systems during the AGU meeting, and we welcome inquiries from the community at any time.

  13. 47 CFR 87.45 - Time in which station is placed in operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Time in which station is placed in operation. 87.45 Section 87.45 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.45 Time in which station is placed...

  14. 78 FR 784 - Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ....; Pilgrim Nuclear Power Station; Exemption 1.0 Background Entergy Nuclear Operations, Inc. (the licensee) is... Nuclear Power Station (PNPS). The license provides, among other things, that the facility is subject to... participated in two FEMA-evaluated exercises in conjunction with the Vermont Yankee Nuclear Power Plant and...

  15. Preparedness of fire safety in underground train station: Comparison between train operators in Malaysia with other operators from the developed countries

    NASA Astrophysics Data System (ADS)

    Tajedi, Noor Aqilah A.; Sukor, Nur Sabahiah A.; Ismail, Mohd Ashraf M.; Shamsudin, Shahrul A.

    2017-10-01

    The purpose of this paper is to compare the fire evacuation plan and preparation at the underground train stations in the different countries. The methodology for this study was using the extended questionnaire survey to investigate the Rapid Rail Sdn Bhd, Malaysia's fire safety plan and preparation at the underground train stations. There were four sections in the questionnaire which included (i) background of the respondents, (ii) the details on the train stations, safety instruction and fire evacuation exercises (iii) technical systems, installation and equipment at the underground stations and (iv) procedures and technical changes related to fire safety that had been applied by the operators. Previously, the respondents from the different train operator services in the developed countries had completed the questionnaires. This paper extends the response from the Rapid Rail Sdn Bhd to compare the emergency procedures and preparation for fire event with the developed countries. As a result, this study found that the equipment and facilities that provided at the underground train stations that operated by Rapid Rail are relevant for fire safety procedures and needs. The main advantage for Rapid Rail is the underground stations were designed with two or more entrances/exits that may perform better evacuation compare to one main entrance/exit train stations in the other developed countries.

  16. International Space Station (ISS)

    NASA Image and Video Library

    2000-09-08

    This is the insignia for STS-98, which marks a major milestone in assembly of the International Space Station (ISS). Atlantis' crew delivered the United States Laboratory, Destiny, to the ISS. Destiny will be the centerpiece of the ISS, a weightless laboratory where expedition crews will perform unprecedented research in the life sciences, materials sciences, Earth sciences, and microgravity sciences. The laboratory is also the nerve center of the Station, performing guidance, control, power distribution, and life support functions. With Destiny's arrival, the Station will begin to fulfill its promise of returning the benefits of space research to Earth's citizens. The crew patch depicts the Space Shuttle with Destiny held high above the payload bay just before its attachment to the ISS. Red and white stripes, with a deep blue field of white stars, border the Shuttle and Destiny to symbolize the continuing contribution of the United States to the ISS. The constellation Hercules, seen just below Destiny, captures the Shuttle and Station's team efforts in bringing the promise of orbital scientific research to life. The reflection of Earth in Destiny's window emphasizes the connection between space exploration and life on Earth.

  17. Evaluation of Low-Earth-Orbit Environmental Effects on International Space Station Thermal Control Materials

    NASA Technical Reports Server (NTRS)

    Dever, Joyce A.

    1998-01-01

    Many spacecraft thermal control coatings in low Earth orbit (LEO) can be affected by solar ultraviolet radiation and atomic oxygen. Ultraviolet radiation can darken some polymers and oxides commonly used in thermal control materials. Atomic oxygen can erode polymer materials, but it may reverse the ultraviolet-darkening effect on oxides. Maintaining the desired solar absorptance for thermal control coatings is important to assure the proper operating temperature of the spacecraft. Thermal control coatings to be used on the International Space Station (ISS) were evaluated for their performance after exposure in the NASA Lewis Research Center's Atomic Oxygen-Vacuum Ultraviolet Exposure (AO-VUV) facility. This facility simulated the LEO environments of solar vacuum ultraviolet (VUV) radiation (wavelength range, 115 to 200 nanometers (nm)) and VUV combined with atomic oxygen. Solar absorptance was measured in vacuo to eliminate the "bleaching" effects of ambient oxygen on VUV-induced degradation. The objective of these experiments was to determine solar absorptance increases of various thermal control materials due to exposure to simulated LEO conditions similar to those expected for ISS. Work was done in support of ISS efforts at the requests of Boeing Space and Defense Systems and Lockheed Martin Vought Systems.

  18. Interdependence of science requirements and safety limitations on the space station

    NASA Technical Reports Server (NTRS)

    Barber, Patrick G.

    1990-01-01

    One of the benefits of experimentation on the Space Station is the ability to carry out the experiment, to immediately analyze the results, to calculate improved experimental parameters, and to quickly repeat the experiment. In this improved mode of operation there are new safety considerations that must be addressed in the design stages of both the station and the experiments. Some of the chemical and procedural requirements are shared, and some of the earth-bound storage, dispensing, and disposal techniques that may assist in the development of analogous procedures for the Space Station are discussed.

  19. Three years of operational experience from Schauinsland CTBT monitoring station.

    PubMed

    Zähringer, M; Bieringer, J; Schlosser, C

    2008-04-01

    Data from three years of operation of a low-level aerosol sampler and analyzer (RASA) at Schauinsland monitoring station are reported. The system is part of the International Monitoring System (IMS) for verification of the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The fully automatic system is capable to measure aerosol borne gamma emitters with high sensitivity and routinely quantifies 7Be and 212Pb. The system had a high level of data availability of 90% within the reporting period. A daily screening process rendered 66 tentative identifications of verification relevant radionuclides since the system entered IMS operation in February 2004. Two of these were real events and associated to a plausible source. The remaining 64 cases can consistently be explained by detector background and statistical phenomena. Inter-comparison with data from a weekly sampler operated at the same station shows instabilities of the calibration during the test phase and a good agreement since certification of the system.

  20. 75 FR 11205 - Entergy Nuclear Operations, Inc; Pilgrim Nuclear Power Station Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ...; Pilgrim Nuclear Power Station Environmental Assessment and Finding of No Significant Impact The U.S... licensee), for operation of Pilgrim Nuclear Power Station (Pilgrim), located in Plymouth County, MA. In... License Renewal of Nuclear Plants: Regarding Pilgrim Nuclear Power Station,'' NUREG-1437, Supplement 29...

  1. Systems Operation Studies for Automated Guideway Transit Systems : Detailed Station Model Functional Specifications

    DOT National Transportation Integrated Search

    1981-07-01

    The Detailed Station Model (DSM) is a discrete event model representing the interrelated queueing processes associated with vehicle and passenger activities in an AGT station. The DSM will provide operational and performance measures of alternative s...

  2. System Operations Studies for Automated Guideway Transit Systems : Detailed Station Model User's Manual

    DOT National Transportation Integrated Search

    1981-07-01

    The Detailed Station Model (DSM) is a discrete event model representing the interrelated queueing processes associated with vehicle and passenger activities in an AGT station. The DSM will provide operational and performance measures of alternative s...

  3. Mars mission effects on Space Station evolution

    NASA Technical Reports Server (NTRS)

    Askins, Barbara S.; Cook, Stephen G.

    1989-01-01

    The permanently manned Space Station scheduled to be operational in low earth by the mid 1990's, will provide accommodations for science, applications, technology, and commercial users, and will develop enabling capabilities for future missions. A major aspect of the baseline Space Station design is that provisions for evolution to greater capabilities are included in the systems and subsystems designs. User requirements are the basis for conceptual evolution modes or infrastructure to support the paths. Four such modes are discussed in support of a Human to Mars mission, along with some of the near term actions protecting the future of supporting Mars missions on the Space Station. The evolution modes include crew and payload transfer, storage, checkout, assembly, maintenance, repair, and fueling.

  4. 18. UPPER STATION, FIRST FLOOR, OPERATOR'S CABIN, LOOKING NORTH, NORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. UPPER STATION, FIRST FLOOR, OPERATOR'S CABIN, LOOKING NORTH, NORTHEAST. - Monongahela Incline Plane, Connecting North side of Grandview Avenue at Wyoming Street with West Carson Street near Smithfield Street, Pittsburgh, Allegheny County, PA

  5. NASA Earth Day 2014

    NASA Image and Video Library

    2014-04-22

    NASA Astronaut John Mace Grunsfeld takes a quick selfie with astronauts at the International Space Station at the NASA sponsored Earth Day event April 22, 2014 at Union Station in Washington, DC. NASA announced the "Global Selfie" event as part of its "Earth Right Now" campaign, celebrating the launch of five Earth-observing missions in 2014. All selfies posted to social media with the hashtag "GlobalSelfie" will be included in a mosaic image of Earth. Photo Credit: (NASA/Aubrey Gemignani)

  6. Performance of DS-CDMA with imperfect power control operating over a low earth orbiting satellite link

    NASA Astrophysics Data System (ADS)

    Vojcic, Branimir R.; Pickholtz, Raymond L.; Milstein, Laurence B.

    1994-05-01

    The analysis of both performance and capacity of direct sequence CDMA in terrestrial cellular systems has been addressed in the technical literature. It has been suggested that CDMA be used as a multiple access method for satellite systems as well, in particular for multispot beam Low Earth Orbit Satellites (LEOS). One is tempted to argue that since CDMA works well on terrestrial links, it will nominally work as well on satellite links. However, because there are fundamental differences in the characteristics of the two channels, such as larger time delays from the mobile to the base station and smaller multipath delay spreads on the satellite channels, the performance of CDMA on satellite links cannot always be accurately predicted from its performance on terrestrial channels. In this paper, we analytically derive the performance of a CDMA system which operates over a low earth orbiting satellite channel. We incorporate such effects as imperfect power control and dual-order diversity to obtain the average probability of error of a single user.

  7. 75 FR 12311 - Entergy Nuclear Operations, Inc; Vermont Yankee Nuclear Power Station Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ...; Vermont Yankee Nuclear Power Station Environmental Assessment and Finding of No Significant Impact The U.S... licensee), for operation of Vermont Yankee Nuclear Power Station (Vermont Yankee), located in Windham... Statement for Vermont Yankee Nuclear Power Station, Docket No. 50-271, dated July 1972, as supplemented...

  8. Space station automation and robotics study. Operator-systems interface

    NASA Technical Reports Server (NTRS)

    1984-01-01

    This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.

  9. The High Definition Earth Viewing (HDEV) Payload

    NASA Technical Reports Server (NTRS)

    Muri, Paul; Runco, Susan; Fontanot, Carlos; Getteau, Chris

    2017-01-01

    The High Definition Earth Viewing (HDEV) payload enables long-term experimentation of four, commercial-of-the-shelf (COTS) high definition video, cameras mounted on the exterior of the International Space Station. The payload enables testing of cameras in the space environment. The HDEV cameras transmit imagery continuously to an encoder that then sends the video signal via Ethernet through the space station for downlink. The encoder, cameras, and other electronics are enclosed in a box pressurized to approximately one atmosphere, containing dry nitrogen, to provide a level of protection to the electronics from the space environment. The encoded video format supports streaming live video of Earth for viewing online. Camera sensor types include charge-coupled device and complementary metal-oxide semiconductor. Received imagery data is analyzed on the ground to evaluate camera sensor performance. Since payload deployment, minimal degradation to imagery quality has been observed. The HDEV payload continues to operate by live streaming and analyzing imagery. Results from the experiment reduce risk in the selection of cameras that could be considered for future use on the International Space Station and other spacecraft. This paper discusses the payload development, end-to- end architecture, experiment operation, resulting image analysis, and future work.

  10. International Space Station (ISS)

    NASA Image and Video Library

    2002-10-09

    Back dropped against a blue and white Earth, the Space Shuttle Orbiter Atlantis was photographed by an Expedition 5 crew member onboard the International Space Station (ISS) during rendezvous and docking operations. Docking occurred at 10:17 am on October 9, 2002. The Starboard 1 (S1) Integrated Truss Structure, the primary payload of the STS-112 mission, can be seen in Atlantis' cargo bay. Installed and outfitted within 3 sessions of Extravehicular Activity (EVA) during the 11 day mission, the S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators.

  11. Communications satellite systems operations with the space station, volume 2

    NASA Technical Reports Server (NTRS)

    Price, K.; Dixon, J.; Weyandt, C.

    1987-01-01

    A financial model was developed which described quantitatively the economics of the space segment of communication satellite systems. The model describes the economics of the space system throughout the lifetime of the satellite. The expected state-of-the-art status of communications satellite systems and operations beginning service in 1995 were assessed and described. New or enhanced space-based activities and associated satellite system designs that have the potential to achieve future communications satellite operations in geostationary orbit with improved economic performance were postulated and defined. Three scenarios using combinations of space-based activities were analyzed: a spin stabilized satellite, a three axis satellite, and assembly at the Space Station and GEO servicing. Functional and technical requirements placed on the Space Station by the scenarios were detailed. Requirements on the satellite were also listed.

  12. Space Station Freedom operations planning

    NASA Technical Reports Server (NTRS)

    Smith, Kevin J.

    1988-01-01

    This paper addresses the development of new planning methodologies which will evolve to serve the Space Station Freedom program; these planning processes will focus on the complex task of effectively managing the resources provided by the Space Station Freedom and will be made available to the diverse international community of space station users in support of their ongoing investigative activities.

  13. The JPL telerobot operator control station. Part 1: Hardware

    NASA Technical Reports Server (NTRS)

    Kan, Edwin P.; Tower, John T.; Hunka, George W.; Vansant, Glenn J.

    1989-01-01

    The Operator Control Station of the Jet Propulsion Laboratory (JPL)/NASA Telerobot Demonstrator System provides the man-machine interface between the operator and the system. It provides all the hardware and software for accepting human input for the direct and indirect (supervised) manipulation of the robot arms and tools for task execution. Hardware and software are also provided for the display and feedback of information and control data for the operator's consumption and interaction with the task being executed. The hardware design, system architecture, and its integration and interface with the rest of the Telerobot Demonstrator System are discussed.

  14. Project EGRESS: Earthbound Guaranteed Reentry from Space Station. the Design of an Assured Crew Recovery Vehicle for the Space Station

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Unlike previously designed space-based working environments, the shuttle orbiter servicing the space station will not remain docked the entire time the station is occupied. While an Apollo capsule was permanently available on Skylab, plans for Space Station Freedom call for a shuttle orbiter to be docked at the space station for no more than two weeks four times each year. Consideration of crew safety inspired the design of an Assured Crew Recovery Vehicle (ACRV). A conceptual design of an ACRV was developed. The system allows the escape of one or more crew members from Space Station Freedom in case of emergency. The design of the vehicle addresses propulsion, orbital operations, reentry, landing and recovery, power and communication, and life support. In light of recent modifications in space station design, Project EGRESS (Earthbound Guaranteed ReEntry from Space Station) pays particular attention to its impact on space station operations, interfaces and docking facilities, and maintenance needs. A water-landing medium-lift vehicle was found to best satisfy project goals of simplicity and cost efficiency without sacrificing safety and reliability requirements. One or more seriously injured crew members could be returned to an earth-based health facility with minimal pilot involvement. Since the craft is capable of returning up to five crew members, two such permanently docked vehicles would allow a full evacuation of the space station. The craft could be constructed entirely with available 1990 technology, and launched aboard a shuttle orbiter.

  15. International Space Station Medical Operations

    NASA Technical Reports Server (NTRS)

    Jones, Jeffrey A.

    2008-01-01

    NASA is currently the leader, in conjunction with our Russian counterpart co-leads, of the Multilateral Medical Policy Board (MMPB), the Multilateral Medical Operations Panel (MMOP), which coordinates medical system support for International Space Station (ISS) crews, and the Multilateral Space Medicine Board (MSMB), which medically certifies all crewmembers for space flight on-board the ISS. These three organizations have representatives from NASA, RSA-IMBP (Russian Space Agency- Institute for Biomedical Problems), GCTC (Gagarin Cosmonaut Training Center), ESA (European Space Agency), JAXA (Japanese Space Agency), and CSA (Canadian Space Agency). The policy and strategic coordination of ISS medical operations occurs at this level, and includes interactions with MMOP working groups in Radiation Health, Countermeasures, Extra Vehicular Activity (EVA), Informatics, Environmental Health, Behavioral Health and Performance, Nutrition, Clinical Medicine, Standards, Post-flight Activities and Rehabilitation, and Training. Each ISS Expedition has a lead Crew Surgeon from NASA and a Russian Crew Surgeon from GCTC assigned to the mission. Day-to-day issues are worked real-time by the flight surgeons and biomedical engineers (also called the Integrated Medical Group) on consoles at the MCC (Mission Control Center) in Houston and the TsUP (Center for Flight Control) in Moscow/Korolev. In the future, this may also include mission control centers in Europe and Japan, when their modules are added onto the ISS. Private medical conferences (PMCs) are conducted regularly and upon crew request with the ISS crew via private audio and video communication links from the biomedical MPSR (multipurpose support room) at MCC Houston. When issues arise in the day-to-day medical support of ISS crews, they are discussed and resolved at the SMOT (space medical operations team) meetings, which occur weekly among the International Partners. Any medical or life science issue that is not resolved at

  16. Mission operations concepts for Earth Observing System (EOS)

    NASA Technical Reports Server (NTRS)

    Kelly, Angelita C.; Taylor, Thomas D.; Hawkins, Frederick J.

    1991-01-01

    Mission operation concepts are described which are being used to evaluate and influence space and ground system designs and architectures with the goal of achieving successful, efficient, and cost-effective Earth Observing System (EOS) operations. Emphasis is given to the general characteristics and concepts developed for the EOS Space Measurement System, which uses a new series of polar-orbiting observatories. Data rates are given for various instruments. Some of the operations concepts which require a total system view are also examined, including command operations, data processing, data accountability, data archival, prelaunch testing and readiness, launch, performance monitoring and assessment, contingency operations, flight software maintenance, and security.

  17. 19. UPPER STATION, FIRST FLOOR, OPERATOR'S CABIN, DOORS TO INCLINE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. UPPER STATION, FIRST FLOOR, OPERATOR'S CABIN, DOORS TO INCLINE PLANE CARS, LOOKING WEST. - Monongahela Incline Plane, Connecting North side of Grandview Avenue at Wyoming Street with West Carson Street near Smithfield Street, Pittsburgh, Allegheny County, PA

  18. Space station orbit maintenance

    NASA Technical Reports Server (NTRS)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  19. View of Childs Powerhouse electrical panel and operator station. In ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Childs Powerhouse electrical panel and operator station. In forground generator #2 and its exciter are visible. Looking north - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  20. Autonomous Payload Operations Onboard the International Space Station

    NASA Technical Reports Server (NTRS)

    Stetson, Howard K.; Deitsch, David K.; Cruzen, Craig A.; Haddock, Angie T.

    2007-01-01

    Operating the International Space Station (ISS) involves many complex crew tended, ground operated and combined systems. Over the life of the ISS program, it has become evident that by having automated and autonomous systems on board, more can be accomplished and at the same time reduce the workload of the crew and ground operators. Engineers at the National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center in Huntsville Alabama, working in collaboration with The Charles Stark Draper Laboratory have developed an autonomous software system that uses the Timeliner User Interface Language and expert logic to continuously monitor ISS payload systems, issue commands and signal ground operators as required. This paper describes the development history of the system, its concept of operation and components. The paper also discusses the testing process as well as the facilities used to develop the system. The paper concludes with a description of future enhancement plans for use on the ISS as well as potential applications to Lunar and Mars exploration systems.

  1. Space station needs, attributes and architectural options study. Volume 5: Cost benefits and programmatic analyses

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The science, applications, commercial, U.S. national security and space operations missions that would require or be materially benefited by the availability of a permanent manned space station in low Earth orbit are considered. Space station attributes and capabilities which will be necessary to satisfy these mission requirements are identified. Emphasis is placed on the identification and validation of potential users, their requirements, and the benefits accruing to them from the existence of a space station, and the programmatic and cost implications of a space station program.

  2. Logistics resupply and emergency crew return system for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Ahne, D.; Caldwell, D.; Davis, K.; Delmedico, S.; Heinen, E.; Ismail, S.; Sumner, C.; Bock, J.; Buente, B.; Gliane, R.

    1989-01-01

    Sometime in the late 1990's, if all goes according to plan, Space Station Freedom will allow the United States and its cooperating partners to maintain a permanent presence in space. Acting as a scientific base of operations, it will also serve as a way station for future explorations of the Moon and perhaps even Mars. Systems onboard the station will have longer lifetimes, higher reliability, and lower maintenance requirements than seen on any previous space flight vehicle. Accordingly, the station will have to be resupplied with consumables (air, water, food, etc.) and other equipment changeouts (experiments, etc.) on a periodic basis. Waste materials and other products will also be removed from the station for return to Earth. The availability of a Logistics Resupply Module (LRM), akin to the Soviet's Progress vehicle, would help to accomplish these tasks. Riding into orbit on an expendable launch vehicle, the LRM would be configured to rendezvous autonomously and dock with the space station. After the module is emptied of its cargo, waste material from the space station would be loaded back into it. The module would then begin its descent to a recovery point on Earth. Logistics Resupply Modules could be configured in a variety of forms depending on the type of cargo being transferred. If the LRM's were cycled to the space station in such a way that at least one vehicle remained parked at the station at all times, the modules could serve double duty as crew emergency return capsules. A pressurized LRM could then bring two or more crew-persons requiring immediate return (because of health problems, system failure, or unavoidable catastrophes) back to Earth. Large cost savings would be accrued by combining the crew return function with a logistics resupply system.

  3. Potential applications of expert systems and operations research to space station logistics functions

    NASA Technical Reports Server (NTRS)

    Lippiatt, Thomas F.; Waterman, Donald

    1985-01-01

    The applicability of operations research, artificial intelligence, and expert systems to logistics problems for the space station were assessed. Promising application areas were identified for space station logistics. A needs assessment is presented and a specific course of action in each area is suggested.

  4. 75 FR 76498 - Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... Company, Davis-Besse Nuclear Power Station; Environmental Assessment And Finding of No Significant Impact... operation of the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS), located in Ottawa County, Ohio. In... the reactor coolant pressure boundary of light-water nuclear power reactors provide adequate margins...

  5. Performance of Sub-Array of ARIANNA Detector Stations during First Year of Operation

    NASA Astrophysics Data System (ADS)

    Tatar, Joulien Erdintch

    The ARIANNA high energy neutrino telescope is designed to search for ultrahigh energy neutrinos produced by the collision of cosmic rays with the cosmic microwave background. ARIANNA exploits the recent development of low noise, low power data acquisition technology to measure the brief radio pulses created by neutrino-induced charged particle showers in the Ross Ice Shelf of Antarctica. Three stations were installed and commissioned in early December 2012 as part of a pilot program to construct a hexagonal array of 7 radio stations. Each station required only 10 Watts of power and operated autonomously using both solar panels and wind generators. In addition, an environmental station was deployed at the ARIANNA site. Data is stored locally and reliably transmitted from Antarctica over high speed wireless internet and Iridium satellite modem during special transmission windows. The wireless internet ceased operation on March 15, corresponding to the fading light condition just before Austral winter. With the aid of wind generation, the stations operated until late May before winter hibernation. Communication was re-established after winter hibernation on September 11, 2013 for three of the four stations. Overall, the stations operated for 65% of the year. The station acquired three types of events: (1) forced, (2) thermal, and (3) signals from an external transmitter, which are called "heartbeat" events. The forced trigger captures the ambient RF conditions at a random snapshot in time. The thermal trigger configuration usually required any 2 of the 4 antenna channels to exceed a voltage level of ˜ 6 · Vrms, where Vrms is the root mean square of the random voltage fluctuations. Individual channel thresholds were adjusted to account for temperature dependences in the electronics. The vast majority of thermal triggers are consistent random gaussian noise expected from thermal processes in the ice and amplifier. Excess power, but no increase is trigger rates, is

  6. UT/CSR analysis of earth rotation from Lageos SLR data

    NASA Technical Reports Server (NTRS)

    Tapley, B. D.; Eanes, R. J.; Schutz, B. E.

    1986-01-01

    The 1983-1984 data collected by NASA and stations participating in the Crustal Dynamics Project from satellite laser ranging (SLR) systems are used to generate solutions for the earth polar motion. Solutions obtained using the MERIT Lageos standard data set are compared to operational results based on quick-look data and generated in near real-time, and the capability of Lageos SLR for the determination of earth orientation parameters (EOP) with high temporal resolution is investigated. Finally, the sensitivity of the MERIT campaign results to the number of tracking stations and to changes in the MERIT standard model is evaluated. It is concluded that the departures from the IAU/IUGG MERIT standards do not significantly change the solution and that solutions accurate at the 2 milliarcsec level can be maintained with a network of fewer than 10 appropriately selected stations.

  7. The issue is leadership. [Space Station program

    NASA Technical Reports Server (NTRS)

    Beggs, J. M.

    1985-01-01

    Four NASA Phase B centers (NASA-Johnson, NASA-Marshall, NASA-Goddard, and NASA-Lewis) are responsible for construction, assembly, servicing, habitat, and other particular tasks and functions of the Space Station. The project has been joined by the aerospace programs of Canada, Japan, and the European Space Agency, ensuring technological and financial support, and cooperative use by the participants. Some of the future uses of the Space Station include biomedical research and applications; experiments in solar-terrestrial physics and astronomy; building, maintenance, and launching of space instruments and planetary missions; manufacturing and processing of materials that call for the conditions of microgravity and weightlessness; supporting communication operations; and improving earth and atmospheric observations. The political significance of the Space Station as a symbol of leadership and of friendly cooperation is noted.

  8. Earth Observation

    NASA Image and Video Library

    2014-06-27

    Earth Observation taken during a day pass by the Expedition 40 crew aboard the International Space Station (ISS). Part of Space Station Remote Manipulator System (SSRMS) is visible. Folder lists this as: the Middle East, Israel.

  9. Looking at Earth from space: Direct readout from environmental satellites

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Direct readout is the capability to acquire information directly from meteorological satellites. Data can be acquired from NASA-developed, National Oceanic and Atmospheric Administration (NOAA)-operated satellites, as well as from other nations' meteorological satellites. By setting up a personal computer-based ground (Earth) station to receive satellite signals, direct readout may be obtained. The electronic satellite signals are displayed as images on the computer screen. The images can display gradients of the Earth's topography and temperature, cloud formations, the flow and direction of winds and water currents, the formation of hurricanes, the occurrence of an eclipse, and a view of Earth's geography. Both visible and infrared images can be obtained. This booklet introduces the satellite systems, ground station configuration, and computer requirements involved in direct readout. Also included are lists of associated resources and vendors.

  10. International Space Station Alpha user payload operations concept

    NASA Technical Reports Server (NTRS)

    Schlagheck, Ronald A.; Crysel, William B.; Duncan, Elaine F.; Rider, James W.

    1994-01-01

    International Space Station Alpha (ISSA) will accommodate a variety of user payloads investigating diverse scientific and technology disciplines on behalf of five international partners: Canada, Europe, Japan, Russia, and the United States. A combination of crew, automated systems, and ground operations teams will control payload operations that require complementary on-board and ground systems. This paper presents the current planning for the ISSA U.S. user payload operations concept and the functional architecture supporting the concept. It describes various NASA payload operations facilities, their interfaces, user facility flight support, the payload planning system, the onboard and ground data management system, and payload operations crew and ground personnel training. This paper summarizes the payload operations infrastructure and architecture developed at the Marshall Space Flight Center (MSFC) to prepare and conduct ISSA on-orbit payload operations from the Payload Operations Integration Center (POIC), and from various user operations locations. The authors pay particular attention to user data management, which includes interfaces with both the onboard data management system and the ground data system. Discussion covers the functional disciplines that define and support POIC payload operations: Planning, Operations Control, Data Management, and Training. The paper describes potential interfaces between users and the POIC disciplines, from the U.S. user perspective.

  11. TYCHO: Demonstrator and operational satellite mission to Earth-Moon-Libration point EML-4 for communication relay provision as a service

    NASA Astrophysics Data System (ADS)

    Hornig, Andreas; Homeister, Maren

    2015-03-01

    In the current wake of mission plans to the Moon and to Earth-Moon Libration points (EML) by several agencies and organizations, TYCHO identifies the key role of telecommunication provision for the future path of lunar exploration. It demonstrates an interesting extension to existing communication methods to the Moon and beyond by combining innovative technology with a next frontier location and the commercial space communication sector. It is evident that all communication systems will rely on direct communication to Earth ground stations. In case of EML-2 missions around HALO orbits or bases on the far side of the Moon, it has to be extended by communication links via relay stations. The innovative approach is that TYCHO provides this relay communication to those out-of-sight lunar missions as a service. TYCHO will establish a new infrastructure for future missions and even create a new market for add-on relay services. The TMA-0 satellite is TYCHO's first phase and a proposed demonstrator mission to the Earth-Moon Libration point EML-4. It demonstrates relay services needed for automated exploratory and manned missions (Moon bases) on the rim (>90°E and >90°W) and far side surface, to lunar orbits and even to EML-2 halo orbits (satellites and space stations). Its main advantage is the permanent availability of communication coverage. This will provide full access to scientific and telemetry data and furthermore to crucial medical monitoring and safety. The communication subsystem is a platform for conventional communication but also a test-bed for optical communication with high data-rate LASER links to serve the future needs of manned bases and periodic burst data-transfer from lunar poles. The operational TMA-1 satellite is a stand-alone mission integrated into existing space communication networks to provide open communication service to external lunar missions. Therefore the long-time stable libration points EML-4 and -5 are selected to guarantee an

  12. The Space Station Freedom - International cooperation and innovation in space safety

    NASA Technical Reports Server (NTRS)

    Rodney, George A.

    1989-01-01

    The Space Station Freedom (SSF) being developed by the United States, European Space Agency (ESA), Japan, and Canada poses novel safety challenges in design, operations, logistics, and program management. A brief overview discloses many features that make SSF a radical departure from earlier low earth orbit (LEO) space stations relative to safety management: size and power levels; multiphase manned assembly; 30-year planned lifetime, with embedded 'hooks and scars' forevolution; crew size and skill-mix variability; sustained logistical dependence; use of man, robotics and telepresence for on-orbit maintenance of station and free-flyer systems; closed-environment recycling; use of automation and expert systems; long-term operation of collocated life-sciences and materials-science experiments, requiring control and segregation of hazardous and chemically incompatible materials; and materials aging in space.

  13. New Earth-Observing Instrument Installed on the International Space Station

    NASA Image and Video Library

    2017-12-08

    In January 2013, a new Earth-observing instrument was installed on the International Space Station (ISS). ISERV Pathfinder consists of a commercial camera, a telescope, and a pointing system, all positioned to look through the Earth-facing window of ISS’s Destiny module. ISERV Pathfinder is intended as an engineering exercise, with the long-term goal of developing a system for providing imagery to developing nations as they monitor natural disasters and environmental concerns. The image above is the “first light” from the new ISERV camera system, taken at 1:44 p.m. local time on February 16, 2013. It shows the Rio San Pablo as it empties into the Golfo de Montijo in Veraguas, Panama. It is an ecological transition zone, changing from agriculture and pastures to mangrove forests, swamps, and estuary systems. The area has been designated a protected area by the National Environmental Authority (ANAM) of Panama and is listed as a “wetland of international importance” under the Ramsar Convention. (Note that the image is rotated so that north is to the upper right.) “ISERV’s full potential is yet to be seen, but we hope it will really make a difference in people’s lives,” said principal investigator Burgess Howell of NASA’s Marshall Space Flight Center. “For example, if an earthen dam gives way in Bhutan, we want to be able to show officials where the bridge is out or where a road is washed out or a power substation is inundated. This kind of information is critical to focus and speed rescue efforts.” The instrument will be controlled from NASA Marshall in Huntsville, Alabama, in collaboration with researchers at hubs in Central America, East Africa, and the Hindu Kush–Himalaya region. They will rely on positioning software to know where the space station is at each moment and to calculate the next chance to view a particular area on the ground. If there's a good viewing opportunity, the SERVIR team will instruct the camera to take high

  14. The Space Station decision - Incremental politics and technological choice

    NASA Technical Reports Server (NTRS)

    Mccurdy, Howard E.

    1990-01-01

    Using primary documents and interviews with participants, this book describes the events that led up to the 1984 decision that NASA should build a permanently occupied, international space station in low earth orbit. The role that civil servants in NASA played in initiating the program is highlighted. The trail of the Space Station proposal as its advocates devised strategies to push it through the White House policy review process is followed. The critical analysis focuses on the way in which 'incrementalism' (the tendency of policy makers to introduce incremental changes once projects are under way) operated in connection with the Space Station program. The book calls for a commitment to a long-range space policy.

  15. Earth Observation

    NASA Image and Video Library

    2014-06-02

    ISS040-E-006817 (2 June 2014) --- Intersecting the thin line of Earth's atmosphere, International Space Station solar array wings are featured in this image photographed by an Expedition 40 crew member on the International Space Station.

  16. International Cooperation of Payload Operations on the International Space Station

    NASA Technical Reports Server (NTRS)

    Melton, Tina; Onken, Jay

    2003-01-01

    One of the primary goals of the International Space Station (ISS) is to provide an orbiting laboratory to be used to conduct scientific research and commercial products utilizing the unique environment of space. The ISS Program has united multiple nations into a coalition with the objective of developing and outfitting this orbiting laboratory and sharing in the utilization of the resources available. The primary objectives of the real- time integration of ISS payload operations are to ensure safe operations of payloads, to avoid mutual interference between payloads and onboard systems, to monitor the use of integrated station resources and to increase the total effectiveness of ISS. The ISS organizational architecture has provided for the distribution of operations planning and execution functions to the organizations with expertise to perform each function. Each IPP is responsible for the integration and operations of their payloads within their resource allocations and the safety requirements defined by the joint program. Another area of international cooperation is the sharing in the development and on- orbit utilization of unique payload facilities. An example of this cooperation is the Microgravity Science Glovebox. The hardware was developed by ESA and provided to NASA as part of a barter arrangement.

  17. Safety in earth orbit study. Volume 2: Analysis of hazardous payloads, docking, on-board survivability

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Detailed and supporting analyses are presented of the hazardous payloads, docking, and on-board survivability aspects connected with earth orbital operations of the space shuttle program. The hazards resulting from delivery, deployment, and retrieval of hazardous payloads, and from handling and transport of cargo between orbiter, sortie modules, and space station are identified and analyzed. The safety aspects of shuttle orbiter to modular space station docking includes docking for assembly of space station, normal resupply docking, and emergency docking. Personnel traffic patterns, escape routes, and on-board survivability are analyzed for orbiter with crew and passenger, sortie modules, and modular space station, under normal, emergency, and EVA and IVA operations.

  18. Reactor engineering support of operations at the Davis-Besse nuclear power station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelley, D.B.

    1995-12-31

    Reactor engineering functions differ greatly from unit to unit; however, direct support of the reactor operators during reactor startups and operational transients is common to all units. This paper summarizes the support the reactor engineers provide the reactor operators during reactor startups and power changes through the use of automated computer programs at the Davis-Besse nuclear power station.

  19. ERTS-1 DCS technical support provided by Wallops Station. [ground truth stations and DCP repair depot

    NASA Technical Reports Server (NTRS)

    Smith, R.

    1975-01-01

    Wallops Station accepted the tasks of providing ground truth to several ERTS investigators, operating a DCP repair depot, designing and building an airborne DCP Data Acquisition System, and providing aircraft underflight support for several other investigators. Additionally, the data bank is generally available for use by ERTS and other investigators that have a scientific interest in data pertaining to the Chesapeake Bay area. Working with DCS has provided a means of evaluating the system as a data collection device possibly applicable to ongoing Earth Resources Program activities in the Chesapeake Bay area as well as providing useful data and services to other ERTS investigators. The two areas of technical support provided by Wallops, ground truth stations and repair for DCPs, are briefly discussed.

  20. ISS EarthKam: Taking Photos of the Earth from Space

    ERIC Educational Resources Information Center

    Haste, Turtle

    2008-01-01

    NASA is involved in a project involving the International Space Station (ISS) and an Earth-focused camera called EarthKam, where schools, and ultimately students, are allowed to remotely program the EarthKAM to take images. Here the author describes how EarthKam was used to help middle school students learn about biomes and develop their…

  1. Study on Operation Optimization of Pumping Station's 24 Hours Operation under Influences of Tides and Peak-Valley Electricity Prices

    NASA Astrophysics Data System (ADS)

    Yi, Gong; Jilin, Cheng; Lihua, Zhang; Rentian, Zhang

    2010-06-01

    According to different processes of tides and peak-valley electricity prices, this paper determines the optimal start up time in pumping station's 24 hours operation between the rating state and adjusting blade angle state respectively based on the optimization objective function and optimization model for single-unit pump's 24 hours operation taking JiangDu No.4 Pumping Station for example. In the meantime, this paper proposes the following regularities between optimal start up time of pumping station and the process of tides and peak-valley electricity prices each day within a month: (1) In the rating and adjusting blade angle state, the optimal start up time in pumping station's 24 hours operation which depends on the tide generation at the same day varies with the process of tides. There are mainly two kinds of optimal start up time which include the time at tide generation and 12 hours after it. (2) In the rating state, the optimal start up time on each day in a month exhibits a rule of symmetry from 29 to 28 of next month in the lunar calendar. The time of tide generation usually exists in the period of peak electricity price or the valley one. The higher electricity price corresponds to the higher minimum cost of water pumping at unit, which means that the minimum cost of water pumping at unit depends on the peak-valley electricity price at the time of tide generation on the same day. (3) In the adjusting blade angle state, the minimum cost of water pumping at unit in pumping station's 24 hour operation depends on the process of peak-valley electricity prices. And in the adjusting blade angle state, 4.85%˜5.37% of the minimum cost of water pumping at unit will be saved than that of in the rating state.

  2. A probabilistic framework for single-station location of seismicity on Earth and Mars

    NASA Astrophysics Data System (ADS)

    Böse, M.; Clinton, J. F.; Ceylan, S.; Euchner, F.; van Driel, M.; Khan, A.; Giardini, D.; Lognonné, P.; Banerdt, W. B.

    2017-01-01

    Locating the source of seismic energy from a single three-component seismic station is associated with large uncertainties, originating from challenges in identifying seismic phases, as well as inevitable pick and model uncertainties. The challenge is even higher for planets such as Mars, where interior structure is a priori largely unknown. In this study, we address the single-station location problem by developing a probabilistic framework that combines location estimates from multiple algorithms to estimate the probability density function (PDF) for epicentral distance, back azimuth, and origin time. Each algorithm uses independent and complementary information in the seismic signals. Together, the algorithms allow locating seismicity ranging from local to teleseismic quakes. Distances and origin times of large regional and teleseismic events (M > 5.5) are estimated from observed and theoretical body- and multi-orbit surface-wave travel times. The latter are picked from the maxima in the waveform envelopes in various frequency bands. For smaller events at local and regional distances, only first arrival picks of body waves are used, possibly in combination with fundamental Rayleigh R1 waveform maxima where detectable; depth phases, such as pP or PmP, help constrain source depth and improve distance estimates. Back azimuth is determined from the polarization of the Rayleigh- and/or P-wave phases. When seismic signals are good enough for multiple approaches to be used, estimates from the various methods are combined through the product of their PDFs, resulting in an improved event location and reduced uncertainty range estimate compared to the results obtained from each algorithm independently. To verify our approach, we use both earthquake recordings from existing Earth stations and synthetic Martian seismograms. The Mars synthetics are generated with a full-waveform scheme (AxiSEM) using spherically-symmetric seismic velocity, density and attenuation models of

  3. Briefing Number 3 to Space Station Operations Task Force Oversight Committee

    NASA Technical Reports Server (NTRS)

    Lyman, Peter; Shelley, Carl

    1987-01-01

    This document reviews certain issues in relationship to the operation of the Space Station Freedom. The document is in outline format and includes some organizational hierarchy charts, pert charts and decision charts.

  4. International Space Station Increment Operations Services

    NASA Astrophysics Data System (ADS)

    Michaelis, Horst; Sielaff, Christian

    2002-01-01

    The Industrial Operator (IO) has defined End-to-End services to perform efficiently all required operations tasks for the Manned Space Program (MSP) as agreed during the Ministerial Council in Edinburgh in November 2001. Those services are the result of a detailed task analysis based on the operations processes as derived from the Space Station Program Implementation Plans (SPIP) and defined in the Operations Processes Documents (OPD). These services are related to ISS Increment Operations and ATV Mission Operations. Each of these End-to-End services is typically characterised by the following properties: It has a clearly defined starting point, where all requirements on the end-product are fixed and associated performance metrics of the customer are well defined. It has a clearly defined ending point, when the product or service is delivered to the customer and accepted by him, according to the performance metrics defined at the start point. The implementation of the process might be restricted by external boundary conditions and constraints mutually agreed with the customer. As far as those are respected the IO has the free choice to select methods and means of implementation. The ISS Increment Operations Service (IOS) activities required for the MSP Exploitation program cover the complete increment specific cycle starting with the support to strategic planning and ending with the post increment evaluation. These activities are divided into sub-services including the following tasks: - ISS Planning Support covering the support to strategic and tactical planning up to the generation - Development &Payload Integration Support - ISS Increment Preparation - ISS Increment Execution These processes are tight together by the Increment Integration Management, which provides the planning and scheduling of all activities as well as the technical management of the overall process . The paper describes the entire End-to-End ISS Increment Operations service and the

  5. Automated Delay Measurement System for an Earth Station for Two-Way Satellite Time and Frequency Transfer

    DTIC Science & Technology

    1994-12-01

    important for improving the TWSTFT capabilities. An automnted system for this purpose has been developed from the initial design at NMi-VSL. It...September 1994 together with a USNO portable station on a calibration trip to European TWSTFT earth staions. 1. Introduction The Two-Way Satellite...Time and Frequency Transfer ( TWSTFT ) method (Fig. I) is used to compare two clocks or time scales which are often located at great distances from each

  6. An evaluation of SAO sites for laser operations

    NASA Technical Reports Server (NTRS)

    Thorp, J. M.; Bush, M. A.; Pearlman, M. R.

    1974-01-01

    Operational criteria are provided for the selection of laser tracking sites for the Earth and Ocean Physics Applications Program. A compilation of data is given concerning the effect of weather conditions on laser and Baker-Nunn camera operations. These data have been gathered from the Smithsonian astrophysical observing station sites occupied since the inception of the satellite tracking program. Also given is a brief description of each site, including its characteristic weather conditions, comments on communications and logistics, and a summary of the terms of agreement under which the station is or was operated.

  7. Mapping experiment with space station

    NASA Technical Reports Server (NTRS)

    Wu, Sherman S. C.

    1987-01-01

    Mapping the earth from space stations can be approached in two areas. One is to collect gravity data for defining a new topographic datum using the earth's gravitational field in terms of spherical harmonics. The other, which should be considered as a very significant contribution of the Space Station, is to search and explore techniques of mapping the earth's topography using either optical or radar images with or without references to ground control points. Geodetic position of ground control points can be predetermined by the Global Positioning System (GPS) for the mapping experiment with the Space Station. It is proposed to establish four ground control points in North America or Africa (including the Sahara Desert). If this experiment should be successfully accomplished, it may also be applied to the defense charting service.

  8. 47 CFR 90.155 - Time in which station must be placed in operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Applications and Authorizations § 90.155 Time in... associated mobile station is also placed in operation. See also §§ 90.633(d) and 90.631(f). (d... multilateration technology, to one or more mobile units. Specifically, LMS multilateration stations will only be...

  9. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  10. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  11. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  12. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  13. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  14. Undergraduate Earth System Science Education: Project-Based Learning, Land-Atmosphere Interaction, and a Newly Established Student Weather Station

    NASA Astrophysics Data System (ADS)

    Baker, D.

    2004-12-01

    Undergraduate students conducted a semester-long research project as part of a special topics course that launched the Austin College Weather Station in spring 2001. The weather station is located on restored prairie roughly 100 km north of Dallas, Texas. In addition to standard meteorological observations, the Austin College Weather Station measures surface quantities such as soil moisture, soil temperature, solar radiation, infrared radiation, and soil heat flux. These additional quantities are used to calculate the surface energy balance using the Bowen ratio method. Thus, the Austin College Weather Station provides valuable information on land-atmosphere interaction in a prairie environment. This project provided a remarkable learning experience for the students. Each student supervised two instruments on the weather station. Students skillfully learned instrumentation details and the physical phenomena measured by the instruments. Team meetings were held each week to discuss issues such as station location, power requirements, telecommunication options, and data acquisition. Students made important decisions during the meetings. They would then work collaboratively on specific tasks that needed to be accomplished before the next meeting. Students also assessed the validity of their measurements after the weather station came on-line. With this approach, students became the experts. They utilized the scientific method to think critically and to solve problems. For at least a semester, students became Earth system scientists.

  15. Some operational aspects of a rotating advanced-technology space station for the year 2025

    NASA Technical Reports Server (NTRS)

    Queijo, M. J.; Butterfield, A. J.; Cuddihy, W. F.; King, C. B.; Stone, R. W.; Wrobel, J. R.; Garn, P. A.

    1988-01-01

    The study of an Advanced Technology Space Station which would utilize the capabilities of subsystems projected for the time frame of the years 2000 to 2025 is discussed. The study includes tradeoffs of nuclear versus solar dynamic power systems that produce power outputs of 2.5 megawatts and analyses of the dynamics of the spacecraft of which portions are rotated for artificial gravity. The design considerations for the support of a manned Mars mission from low Earth orbit are addressed. The studies extend to on-board manufacturing, internal gas composition effects, and locomotion and material transfer under artificial gravity forces. The report concludes with an assessment of technology requirements for the Advanced Technology Space Station.

  16. Automating Stowage Operations for the International Space Station

    NASA Technical Reports Server (NTRS)

    Knight, Russell; Rabideau, Gregg; Mishkin, Andrew; Lee, Young

    2013-01-01

    A challenge for any proposed mission is to demonstrate convincingly that the proposed systems will in fact deliver the science promised. Funding agencies and mission design personnel are becoming ever more skeptical of the abstractions that form the basis of the current state of the practice with respect to approximating science return. To address this, we have been using automated planning and scheduling technology to provide actual coverage campaigns that provide better predictive performance with respect to science return for a given mission design and set of mission objectives given implementation uncertainties. Specifically, we have applied an adaptation of ASPEN and SPICE to the Eagle-Eye domain that demonstrates the performance of the mission design with respect to coverage of science imaging targets that address climate change and disaster response. Eagle-Eye is an Earth-imaging telescope that has been proposed to fly aboard the International Space Station (ISS).

  17. Modeling of the spatial state of the ionosphere using regular definitions of the VTEC identifier at the network of continuously operating GNSS stations of Ukraine

    NASA Astrophysics Data System (ADS)

    Yankiv-Vitkovska, Liubov; Dzhuman, Bogdan

    2017-04-01

    Due to the wide application of global navigation satellite systems (GNSS), the development of the modern GNSS infrastructure moved the monitoring of the Earth's ionosphere to a new methodological and technological level. The peculiarity of such monitoring is that it allows conducting different experimental studies including the study of the ionosphere directly while using the existing networks of reference GNSS stations intended for solving other problems. The application of the modern GNSS infrastructure is another innovative step in the ionospheric studies as such networks allow to conduct measurements continuously over time in any place. This is used during the monitoring of the ionosphere and allows studying the global and regional phenomena in the ionosphere in real time. Application of a network of continuously operating reference stations to determine numerical characteristics of the Earth's ionosphere allows creating an effective technology to monitor the ionosphere regionally. This technology is intended to solve both scientific problems concerning the space weather, and practical tasks such as providing coordinates of the geodetic level accuracy. For continuously operating reference GNSS stations, the results of the determined ionization identifier TEC (Total Electron Content). On the one hand, this data reflects the state of the ionosphere during the observation; on the other hand, it is a substantial tool for accuracy improvement and reliable determination of coordinates of the observation place. Thus, it was decided to solve a problem of restoring the spatial position of the ionospheric state or its ionization field according to the regular definitions of the TEC identifier, i.e. VTEC (Vertical TEC). The description below shows one of the possible solutions that is based on the spherical cap harmonic analysis method for modeling VTEC parameter. This method involves transformation of the initial data to a spherical cap and construction of model using

  18. Title V Operating Permit: XTO Energy, Inc. - Tap 5 Compressor Station

    EPA Pesticide Factsheets

    Initial Title V Operating Permit (Permit Number: V-UO-000018-2007.00) and the Administrative Permit Record for the XTO Energy, Inc., Tap 5 Compressor Station, located on the Uintah and Ouray Indian Reservation.

  19. Earth-Facing Antenna Characterization in Complex Ground Plane/Multipath Rich Environment

    NASA Technical Reports Server (NTRS)

    Welch, Bryan W.; Piasecki, Marie T.

    2015-01-01

    The Space Communications and Navigation (SCAN) Testbed was a Software Defined Radio (SDR)-based payload launched to the International Space Station (ISS) in July of 2012. The purpose of the SCAN Testbed payload was to investigate the applicability of SDRs to NASA space missions in an operational environment, which means that a proper model for system performance in said operational space environment is a necessary condition. The SCAN Testbed has line-of-sight connections to various ground stations with its S-Band Earth-facing Near-Earth-Network Low Gain Antenna (NEN-LGA). Any previous efforts to characterize the NEN-LGA proved difficult, therefore, the NASA Glenn Research Center built its own S-Band ground station, which became operational in 2015, and has been used successfully to characterize the NEN-LGA's in-situ pattern measurements. This methodology allows for a more realistic characterization of the antenna performance, where the pattern oscillation induced by the complex ISS ground plane, as well as shadowing effects due to ISS structural blockage are included into the final performance model. This paper describes the challenges of characterizing an antenna pattern in this environment. It will also discuss the data processing, present the final antenna pattern measurements and derived model, as well as discuss various lessons learned

  20. Real-time operation of the NSF EarthScope USArray Transportable Array

    NASA Astrophysics Data System (ADS)

    Astiz, L.; Eakins, J. A.; Vernon, F. L.; Martynov, V.; Newman, R. L.; Cox, T. A.; Mulder, T. L.; Busby, R. W.

    2007-05-01

    The Transportable Array (TA) component of USArray uses real-time telemetry to send data to the Array Network Facility (ANF) through a variety of satellite, mobile phone, wireless and wired communication links. The ANF is responsible for the timely delivery of metadata and waveform data to the IRIS DMC from the growing number of Transportable Array stations. The IRIS DMC makes these data available to the research community. The network has increased in size to 327 stations with 259 out of the 400 new TA sites installed (as of 28 February 2007). Starting in Fall 2007, equipment will start to roll from current stations to new locations to the east of the current footprint. Use of the Antelope software package has allowed the ANF to maintain and operate this extremely dynamic network configuration, facilitating the collection and transfer of data, the generation and merging of the metadata as well as the real-time monitoring of state of health of TA station data-loggers and their command and control. Four regional networks (ANZA, BDSN, SCSN, and UNR) as well as the USNSN contribute data to the Transportable Array in real-time. Although the real-time data flow to the IRIS DMC has been 93.4% over the last year, the ANF and the TA field teams have extended every effort and have managed to recover an additional 4.8% by recovering data from the local data storage device (Baler 14) at each station. Once the missing data is recovered, we then generate station-channel-day volume seed files, which are resent to the DMC to bring the total data recovery rate to 98.4%. The total network uptime is above 99%. Analyst review of automatic locations for the USArray network is being done at the ANF as part of the data quality monitoring strategy. All events are associated with the USGS and regional network bulletins. As of February 2007, around 13,000 weekly picks are being fully reviewed by analysts at the ANF and over 19,000 events have been recorded. We find a small percentage (about

  1. The 136 MHZ/400 MHz earth station antenna-noise temperature prediction program for RAE-B

    NASA Technical Reports Server (NTRS)

    Taylor, R. E.; Fee, J. J.; Chin, M.

    1972-01-01

    A simulation study was undertaken to determine the 136 MHz and 400 MHz noise temperature of the ground network antennas which will track the RAE-B satellite during data transmission periods. Since the noise temperature of the antenna effectively sets the signal-to-noise ratio of the received signal, a knowledge of SNR will be helpful in locating the optimum time windows for data transmission during low noise periods. Antenna noise temperatures will be predicted for selected earth-based ground stations which will support RAE-B. Telemetry data acquisition will be at 400 MHz; tracking support at 136 MHz will be provided by the Goddard Range and Range Rate (RARR) stations. The antenna-noise temperature predictions will include the effects of galactic-brightness temperature, the sun, and the brightest radio stars. Predictions will cover the ten-month period from March 1, 1973 to December 31, 1973.

  2. 2016 Mission Operations Working Group: Earth Observing-1 (EO-1)

    NASA Technical Reports Server (NTRS)

    Frye, Stuart

    2016-01-01

    EO-1 Mission Status for the Constellation Mission Operations Working Group to discuss the EO-1 flight systems, mission enhancements, debris avoidance maneuver, orbital information, 5-year outlook, and new ground stations.

  3. The Princess Elisabeth Station

    NASA Technical Reports Server (NTRS)

    Berte, Johan

    2012-01-01

    Aware of the increasing impact of human activities on the Earth system, Belgian Science Policy Office (Belspo) launched in 1997 a research programme in support of a sustainable development policy. This umbrella programme included the Belgian Scientific Programme on Antarctic Research. The International Polar Foundation, an organization led by the civil engineer and explorer Alain Hubert, was commissioned by the Belgian Federal government in 2004 to design, construct and operate a new Belgian Antarctic Research Station as an element under this umbrella programme. The station was to be designed as a central location for investigating the characteristic sequence of Antarctic geographical regions (polynia, coast, ice shelf, ice sheet, marginal mountain area and dry valleys, inland plateau) within a radius of 200 kilometers (approx.124 miles) of a selected site. The station was also to be designed as "state of the art" with respect to sustainable development, energy consumption, and waste disposal, with a minimum lifetime of 25 years. The goal of the project was to build a station and enable science. So first we needed some basic requirements, which I have listed here; plus we had to finance the station ourselves. Our most important requirement was that we decided to make it a zero emissions station. This was both a philosophical choice as we thought it more consistent with Antarctic Treaty obligations and it was also a logistical advantage. If you are using renewable energy sources, you do not have to bring in all the fuel.

  4. International Space Station (ISS)

    NASA Image and Video Library

    2001-09-16

    The setting sun and the thin blue airglow line at Earth's horizon was captured by the International Space Station's (ISS) Expedition Three crewmembers with a digital camera. Some of the Station's components are silhouetted in the foreground. The crew was launched aboard the Space Shuttle Orbiter Discovery STS-105 mission, on August 10, 2001, replacing the Expedition Two crew. After marning the orbiting ISS for 128 consecutive days, the three returned to Earth on December 17, 2001, aboard the STS-108 mission Space Shuttle Orbiter Endeavour.

  5. The NASA Earth Science Flight Program: an update

    NASA Astrophysics Data System (ADS)

    Neeck, Steven P.

    2015-10-01

    Earth's changing environment impacts every aspect of life on our planet and climate change has profound implications on society. Studying Earth as a single complex system is essential to understanding the causes and consequences of climate change and other global environmental concerns. NASA's Earth Science Division (ESD) shapes an interdisciplinary view of Earth, exploring interactions among the atmosphere, oceans, ice sheets, land surface interior, and life itself. This enables scientists to measure global and climate changes and to inform decisions by government, other organizations, and people in the United States and around the world. The data collected and results generated are accessible to other agencies and organizations to improve the products and services they provide, including air quality indices, disaster prediction and response, agricultural yield projections, and aviation safety. ESD's Flight Program provides the space based observing systems and infrastructure for mission operations and scientific data processing and distribution that support NASA's Earth science research and modeling activities. The Flight Program currently has 21 operating Earth observing space missions, including the recently launched Global Precipitation Measurement (GPM) mission, the Orbiting Carbon Observatory-2 (OCO-2), the Soil Moisture Active Passive (SMAP) mission, and the International Space Station (ISS) RapidSCAT and Cloud-Aerosol Transport System (CATS) instruments. The ESD has 22 more missions and instruments planned for launch over the next decade. These include first and second tier missions from the 2007 Earth Science Decadal Survey, Climate Continuity missions and selected instruments to assure availability of key climate data sets, operational missions to ensure sustained land imaging provided by the Landsat system, and small-sized competitively selected orbital missions and instrument missions of opportunity belonging to the Earth Venture (EV) Program. Some

  6. A comparison of Frequency Domain Multiple Access (FDMA) and Time Domain Multiple Access (TDMA) approaches to satellite service for low data rate Earth stations

    NASA Technical Reports Server (NTRS)

    Stevens, G.

    1983-01-01

    A technological and economic assessment is made of providing low data rate service to small earth stations by satellite at Ka-band. Various Frequency Domain Multiple Access (FDMA) and Time Domain Multiple Access (TDMA) scenarios are examined and compared on the basis of cost to the end user. Very small stations (1 to 2 meters in diameter) are found not to be viable alternatives to available terrestrial services. However, medium size (3 to 5 meters) earth stations appear to be very competitive if a minimum throughput of about 1.5 Mbs is maintained. This constrains the use of such terminals to large users and shared use by smaller users. No advantage was found to the use of FDMA. TDMA had a slight advantage from a total system viewpoint and a very significant advantage in the space segment (about 1/3 the required payload weight for an equivalent capacity).

  7. Earth Observations

    NASA Image and Video Library

    2010-06-16

    ISS024-E-006136 (16 June 2010) --- Polar mesospheric clouds, illuminated by an orbital sunrise, are featured in this image photographed by an Expedition 24 crew member on the International Space Station. Polar mesospheric, or noctilucent (?night shining?), clouds are observed from both Earth?s surface and in orbit by crew members aboard the space station. They are called night-shining clouds as they are usually seen at twilight. Following the setting of the sun below the horizon and darkening of Earth?s surface, these high clouds are still briefly illuminated by sunlight. Occasionally the ISS orbital track becomes nearly parallel to Earth?s day/night terminator for a time, allowing polar mesospheric clouds to be visible to the crew at times other than the usual twilight due to the space station altitude. This unusual photograph shows polar mesospheric clouds illuminated by the rising, rather than setting, sun at center right. Low clouds on the horizon appear yellow and orange, while higher clouds and aerosols are illuminated a brilliant white. Polar mesospheric clouds appear as light blue ribbons extending across the top of the image. These clouds typically occur at high latitudes of both the Northern and Southern Hemispheres, and at fairly high altitudes of 76?85 kilometers (near the boundary between the mesosphere and thermosphere atmospheric layers). The ISS was located over the Greek island of Kos in the Aegean Sea (near the southwestern coastline of Turkey) when the image was taken at approximately midnight local time. The orbital complex was tracking northeastward, nearly parallel to the terminator, making it possible to observe an apparent ?sunrise? located almost due north. A similar unusual alignment of the ISS orbit track, terminator position, and seasonal position of Earth?s orbit around the sun allowed for striking imagery of polar mesospheric clouds over the Southern Hemisphere earlier this year.

  8. WWLLN and Earth Networks new combined Global Lightning Network: First Look

    NASA Astrophysics Data System (ADS)

    Holzworth, R. H., II; Brundell, J. B.; Sloop, C.; Heckman, S.; Rodger, C. J.

    2016-12-01

    Lightning VLF sferic waveforms detected around the world by WWLLN (World Wide Lightning Location Network) and by Earth Networks WTLN receivers are being analyzed in real time to calculate the time of group arrival (TOGA) of the sferic wave packet at each station. These times (TOGAs) are then used for time-of-arrival analysis to determine the source lightning location. Beginning in 2016 we have successfully implemented the operational software to allow the incorporation of waveforms from hundreds of Earth Networks sensors into the normal WWLLN TOGA processing, resulting in a new global lightning distribution which has over twice as many stroke locations as the WWLLN-only data set. The combined global lightning network shows marked improvement over the WWLLN-only data set in regions such as central and southern Africa, and over the Indian subcontinent. As of July 2016 the new data set is typically running at about 230% of WWLLN-only in terms of total strokes, and some days over 250%, using data from 65 to 70 WWLLN stations, combined with the VLF channel from about 160 Earth Networks stations. The Earth Networks lightning network includes nearly 1000 receiving stations, so it is anticipated we will be able to further increase the total stations being used for the new combined network while still maintaining a relatively smooth global distribution of the sensors. Detailed comparisons of the new data set with WWLLN-only data, as well as with independent lightning location networks including WTLN in the CONUS and NZLDN in New Zealand will be presented.

  9. 47 CFR 97.221 - Automatically controlled digital station.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... station. (a) This rule section does not apply to an auxiliary station, a beacon station, a repeater station, an earth station, a space station, or a space telecommand station. (b) A station may be... 47 Telecommunication 5 2013-10-01 2013-10-01 false Automatically controlled digital station. 97...

  10. 47 CFR 97.221 - Automatically controlled digital station.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... station. (a) This rule section does not apply to an auxiliary station, a beacon station, a repeater station, an earth station, a space station, or a space telecommand station. (b) A station may be... 47 Telecommunication 5 2012-10-01 2012-10-01 false Automatically controlled digital station. 97...

  11. 47 CFR 97.221 - Automatically controlled digital station.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... station. (a) This rule section does not apply to an auxiliary station, a beacon station, a repeater station, an earth station, a space station, or a space telecommand station. (b) A station may be... 47 Telecommunication 5 2014-10-01 2014-10-01 false Automatically controlled digital station. 97...

  12. 47 CFR 97.221 - Automatically controlled digital station.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... station. (a) This rule section does not apply to an auxiliary station, a beacon station, a repeater station, an earth station, a space station, or a space telecommand station. (b) A station may be... 47 Telecommunication 5 2011-10-01 2011-10-01 false Automatically controlled digital station. 97...

  13. Technology and Engineering Advances Supporting EarthScope's Alaska Transportable Array

    NASA Astrophysics Data System (ADS)

    Miner, J.; Enders, M.; Busby, R.

    2015-12-01

    EarthScope's Transportable Array (TA) in Alaska and Canada is an ongoing deployment of 261 high quality broadband seismographs. The Alaska TA is the continuation of the rolling TA/USArray deployment of 400 broadband seismographs in the lower 48 contiguous states and builds on the success of the TA project there. The TA in Alaska and Canada is operated by the IRIS Consortium on behalf of the National Science Foundation as part of the EarthScope program. By Sept 2015, it is anticipated that the TA network in Alaska and Canada will be operating 105 stations. During the summer of 2015, TA field crews comprised of IRIS and HTSI station specialists, as well as representatives from our partner agencies the Alaska Earthquake Center and the Alaska Volcano Observatory and engineers from the UNAVCO Plate Boundary Observatory will have completed a total of 36 new station installations. Additionally, we will have completed upgrades at 9 existing Alaska Earthquake Center stations with borehole seismometers and the adoption of an additional 35 existing stations. Continued development of battery systems using LiFePO4 chemistries, integration of BGAN, Iridium, Cellular and VSAT technologies for real time data transfer, and modifications to electronic systems are a driving force for year two of the Alaska Transportable Array. Station deployment utilizes custom heliportable drills for sensor emplacement in remote regions. The autonomous station design evolution include hardening the sites for Arctic, sub-Arctic and Alpine conditions as well as the integration of rechargeable Lithium Iron Phosphate batteries with traditional AGM batteries We will present new design aspects, outcomes, and lessons learned from past and ongoing deployments, as well as efforts to integrate TA stations with other existing networks in Alaska including the Plate Boundary Observatory and the Alaska Volcano Observatory.

  14. Flight deck activity during flyaround of Mir Space Station

    NASA Image and Video Library

    1996-04-19

    STS076-316-008 (23 March 1996) --- On the aft flight deck of the Space Shuttle Atlantis, astronaut Linda M. Godwin uses a hand-held laser instrument to check the range of Russia's Mir Space Station during docking operations. The two spacecraft were in the process of making their third docking in Earth-orbit. With the subsequent delivery of astronaut Shannon W. Lucid to the Mir, the Mir-21 crew grew from two to three, as the mission specialist quickly becomes a cosmonaut guest researcher. Lucid will spend approximately 140 days on Mir before returning to Earth.

  15. Space station user's handbook (Revised)

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A modular space station concept that furnishes facilities which may be used for experimentation and application during earth orbit missions is described in a user's handbook. The subjects discussed are: (1) overall profile and mission activities for five year on-orbit program, (2) electromagnetic energy transmission through earth atmosphere, (3) effects of atmosphere in limiting resolution, and (4) the hydrological cycle as these subjects apply to the space station data acquisition function.

  16. Space Station

    NASA Image and Video Library

    1991-01-01

    This artist's concept depicts the Space Station Freedom as it would look orbiting the Earth, illustrated by Marshall Space Flight Center artist, Tom Buzbee. Scheduled to be completed in late 1999, this smaller configuration of the Space Station featured a horizontal truss structure that supported U.S., European, and Japanese Laboratory Modules; the U.S. Habitation Module; and three sets of solar arrays. The Space Station Freedom was an international, permanently marned, orbiting base to be assembled in orbit by a series of Space Shuttle missions that were to begin in the mid-1990's.

  17. Space Station

    NASA Image and Video Library

    1991-01-01

    This artist's concept depicts the Space Station Freedom as it would look orbiting the Earth; illustrated by Marshall Space Flight Center artist, Tom Buzbee. Scheduled to be completed in late 1999, this smaller configuration of the Space Station features a horizontal truss structure that supported U.S., European, and Japanese Laboratory Modules; the U.S. Habitation Module; and three sets of solar arrays. The Space Station Freedom was an international, permanently marned, orbiting base to be assembled in orbit by a series of Space Shuttle missions that were to begin in the mid-1990's.

  18. Achieving Operational Two-Way Laser Acquisition for OPALS Payload on the International Space Station

    NASA Technical Reports Server (NTRS)

    Abrahamson, Matthew J.; Oaida, Bogdan V.; Sindiy, Oleg; Biswas, Abhijit

    2015-01-01

    The Optical PAyload for Lasercomm Science (OPALS) experiment was installed on the International Space Station (ISS) in April 2014. Developed as a technology demonstration, its objective was to experiment with space-to-ground optical communications transmissions from Low Earth Orbit. More than a dozen successful optical links were established between a Wrightwood, California-based ground telescope and the OPALS flight terminal from June 2014 to September 2014. Each transmission required precise bi-directional pointing to be maintained between the space-based transmitter and ground-based receiver. This was accomplished by acquiring and tracking a laser beacon signal transmitted from the ground telescope to the OPALS flight terminal on the ISS. OPALS demonstrated the ability to nominally acquire the beacon within three seconds at 25deg elevation and maintain lock within 140 µrad (3(sigma)) for the full 150-second transmission duration while slewing at rates up to 1deg/sec. Additional acquisition attempts in low elevation and weather-challenged conditions provided valuable insight on the optical link robustness under off-nominal operational conditions.

  19. Interference and Compatibility Studies Between Satellite Service Systems and Systems Using High Altitude Platform Stations

    NASA Astrophysics Data System (ADS)

    Milas, Vasilis; Koletta, Maria; Constantinou, Philip

    2003-07-01

    This paper provides the results of interference and compatibility studies in order to assess the sharing conditions between Fixed Satellite Service (FSS) and Fixed Service provided by High Altitude Platform Stations (HAPS) in the same operational frequency bands and discusses the most important operational parameters that have an impact on the interference calculations. To characterize interference phenomena between the two systems carrier to interference (C/I) ratios are evaluated. Simulation results under the scenario of a realistic deployment of HAPS and the use of different satellite configurations are presented. An interesting result derived from the simulations is that FSS/GSO Earth Stations and HAPS ground stations may coexist in the HAPS coverage area under certain considerations.

  20. Earth Observation from the International Space Station -Remote Sensing in Schools-

    NASA Astrophysics Data System (ADS)

    Schultz, Johannes; Rienow, Andreas; Graw, Valerie; Heinemann, Sascha; Selg, Fabian; Menz, Gunter

    2016-04-01

    Since spring 2014, the NASA High Definition Earth Viewing (HDEV) mission at the International Space Station (ISS) is online. HDEV consists of four cameras mounted at ESA's Columbus laboratory and is recording the earth 24/7. The educational project 'Columbus Eye - Live-Imagery from the ISS in Schools' has published a learning portal for earth observation from the ISS (www.columbuseye.uni-bonn.de). Besides a video live stream, the portal contains an archive providing spectacular footage, web-GIS and an observatory with interactive materials for school lessons. Columbus Eye is carried out by the University of Bonn and funded by the German Aerospace Center (DLR) Space Administration. Pupils should be motivated to work with the footage in order to learn about patterns and processes of the coupled human-environment system like volcano eruptions or deforestation. The material is developed on the experiences of the FIS (German abbreviation for "Remote Sensing in Schools") project and its learning portal (http://www.fis.uni-bonn.de). Based on the ISS videos three different teaching material types are developed. The simplest teaching type are provided by worksheets, which have a low degree of interactivity. Alongside a short didactical commentary for teachers is included. Additionally, videos, ancillary information, maps, and instructions for interactive school experiments are provided. The observatory contains the second type of the Columbus Eye teaching materials. It requires a high degree of self-organisation and responsibility of the pupils. Thus, the observatory provides the opportunity for pupils to freely construct their own hypotheses based on a spatial analysis tool similar to those provided by commercial software. The third type are comprehensive learning and teaching modules with a high degree of interactivity, including background information, interactive animations, quizzes and different analysis tools (e.g. change detection, classification, polygon or NDVI

  1. The Operational Role of the Belgian User Support and Operations Centre for the Atmosphere-Space Interactions Monitor (ASIM) on-board the International Space Station.

    NASA Astrophysics Data System (ADS)

    Muller, C.; Moreau, D., Sr.; Pandey, P. K.; Crosby, N. B.

    2014-12-01

    The Belgian User Support and Operations Centre (B.USOC) is an operational centre managing technological and scientific payloads on the International Space Station (ISS). B.USOC is the Facility Responsible Centre (FRC) for the European Space Agency's (ESA) Atmosphere-Space Interactions Monitor (ASIM) payload and also manages the Scientific Mission Centre of the Centre National d'Etudes Spatiales (CNES) PICARD satellite that monitors solar activity, among various other space missions. In this respect, B.USOC is ideally positioned to manage possible synergies between ASIM, the satellite TARANIS (Tool for the Analysis of RAdiation from lightNIng and Sprites), other space missions and ground-based networks. The ASIM mission (Neubert, 2009) consists of a package of two nadir instruments: one for the visible spectrum and another for X-ray and gamma-ray frequencies. In the normal operating mode "trigger mode" both instruments continuously measure, but, do not record data below certain thresholds. Another mode is a "timed mode", where, during a certain time the observations are recorded even in the absence of triggers. The "timed mode" demands a lot of flexibility from both scientific teams and B.USOC, as, ASIM's main targets of investigation (sprites and elves) are related to intense thunderstorms and thus, require reliable meteorological forecasts in the entire range of ISS latitudes. Moreover, ASIM is sensitive to a large number of phenomena of which most have a direct relationship with solar activity and therefore would probably need support from the ESA SSA (Space Situational Awareness) Space Weather Coordination Centre (SSCC) that shares the same campus with B.USOC. Local cooperation between the two centres, together with other space payloads such as TARANIS and ground-based networks will greatly optimize ASIM payload operations as well as scientific return. Neubert, T., and the ASIM Team, ASIM - an Instrument Suite for the International Space Station, Corte Workshop

  2. The partnership: Space shuttle, space science, and space station

    NASA Technical Reports Server (NTRS)

    Culbertson, Philip E.; Freitag, Robert F.

    1989-01-01

    An overview of the NASA Space Station Program functions, design, and planned implementation is presented. The discussed functions for the permanently manned space facility include: (1) development of new technologies and related commercial products; (2) observations of the Earth and the universe; (3) provision of service facilities for resupply, maintenance, upgrade and repair of payloads and spacecraft; (4) provision of a transportation node for stationing, processing and dispatching payloads and vehicles; (5) provision of manufacturing and assembly facilities; (6) provision of a storage depot for parts and payloads; and (7) provision of a staging base for future space endeavors. The fundamental concept for the Space Station, as given, is that it be designed, operated, and evolved in response to a broad variety of scientific, technological, and commercial user interests. The Space Shuttle's role as the principal transportation system for the construction and maintenance of the Space Station and the servicing and support of the station crew is also discussed.

  3. 75 FR 10833 - In the Matter of Entergy Nuclear Operations; Vermont Yankee Nuclear Power Station; Demand for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 05000271; License No. DPR-28; EA-10-034; NRC-2010-0089] In the Matter of Entergy Nuclear Operations; Vermont Yankee Nuclear Power Station; Demand for.... The license authorizes the operation of the Vermont Yankee Nuclear Power Station (Vermont Yankee) in...

  4. Earth-Facing Antenna Characterization in a Complex Ground Plane/Multipath Rich Environment

    NASA Technical Reports Server (NTRS)

    Welch, Bryan W.; Piasecki, Marie T.

    2015-01-01

    The Space Communications and Navigation (SCAN) Testbed was a Software Defined Radio (SDR)-based payload launched to the International Space Station (ISS) in July of 2012. The purpose of the SCAN Testbed payload was to investigate the applicability of SDRs to NASA space missions in an operational space environment, which means that a proper model for system performance in said operational space environment is a necessary condition. The SCAN Testbed has line-of-sight connections to various ground stations with its S-Band Earth-facing Near-Earth Network Low Gain Antenna (NEN-LGA). Any previous efforts to characterize the NEN-LGA proved difficult, therefore, the NASA Glenn Research Center built its own S-Band ground station, which became operational in 2015, and has been successfully used to characterize the NEN-LGAs in-situ pattern measurements. This methodology allows for a more realistic characterization of the antenna performance, where the pattern oscillation induced by the complex ISS ground plane, as well as shadowing effects due to ISS structural blockage are included into the final performance model. This paper describes the challenges of characterizing an antenna pattern in this environment. It will also discuss the data processing, present the final antenna pattern measurements and derived model, as well as discuss various lessons learned.

  5. An Earth-Moon Transfer Trajectory Design and Analysis Considering Spacecraft's Visibility from Daejeon Ground Station at TLI and LOI Maneuvers

    NASA Astrophysics Data System (ADS)

    Woo, Jin; Song, Young-Joo; Park, Sang-Young; Kim, Hae-Dong; Sim, Eun-Sup

    2010-09-01

    The optimal Earth-Moon transfer trajectory considering spacecraft's visibility from the Daejeon ground station visibility at both the trans lunar injection (TLI) and lunar orbit insertion (LOI) maneuvers is designed. Both the TLI and LOI maneuvers are assumed to be impulsive thrust. As the successful execution of the TLI and LOI maneuvers are crucial factors among the various lunar mission parameters, it is necessary to design an optimal lunar transfer trajectory which guarantees the visibility from a specified ground station while executing these maneuvers. The optimal Earth-Moon transfer trajectory is simulated by modifying the Korean Lunar Mission Design Software using Impulsive high Thrust Engine (KLMDS-ITE) which is developed in previous studies. Four different mission scenarios are established and simulated to analyze the effects of the spacecraft's visibility considerations at the TLI and LOI maneuvers. As a result, it is found that the optimal Earth-Moon transfer trajectory, guaranteeing the spacecraft's visibility from Daejeon ground station at both the TLI and LOI maneuvers, can be designed with slight changes in total amount of delta-Vs. About 1% difference is observed with the optimal trajectory when none of the visibility condition is guaranteed, and about 0.04% with the visibility condition is only guaranteed at the time of TLI maneuver. The spacecraft's mass which can delivered to the Moon, when both visibility conditions are secured is shown to be about 534 kg with assumptions of KSLV-2's on-orbit mass about 2.6 tons. To minimize total mission delta-Vs, it is strongly recommended that visibility conditions at both the TLI and LOI maneuvers should be simultaneously implemented to the trajectory optimization algorithm.

  6. Planning in the Continuous Operations Environment of the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  7. The manned space station

    NASA Astrophysics Data System (ADS)

    Kovit, B.

    The development and establishment of a manned space station represents the next major U.S. space program after the Space Shuttle. If all goes according to plan, the space station could be in orbit around the earth by 1992. A 'power tower' station configuration has been selected as a 'reference' design. This configuration involves a central truss structure to which various elements are attached. An eight-foot-square truss forms the backbone of a structure about 400 feet long. At its lower end, nearest the earth, are attached pressurized manned modules. These modules include two laboratory modules and two so-called 'habitat/command' modules, which provide living and working space for the projected crew of six persons. Later, the station's pressurized space would be expanded to accommodate up to 18 persons. By comparison, the Soviets will provide habitable space for 12 aboard a 300-ton station which they are expected to place in orbit. According to current plans the six U.S. astronauts will work in two teams of three persons each. A ninety-day tour of duty is considered.

  8. NASA philosophy concerning space stations as operations centers for construction and maintenance of large orbiting energy systems

    NASA Technical Reports Server (NTRS)

    Freitag, R. F.

    1976-01-01

    Future United States plans for manned space-flight activities are summarized, emphasizing the long-term goals of achieving permanent occupancy and limited self-sufficiency in space. NASA-sponsored studies of earth-orbiting Space Station concepts are reviewed along with lessons learned from the Skylab missions. Descriptions are presented of the Space Transportation System, the Space Construction Base, and the concept of space industrialization (the processing and manufacturing of goods in space). Future plans for communications satellites, solar-power satellites, terrestrial observations from space stations, and manned orbital-transfer vehicles are discussed.

  9. Economic benefits of the Space Station to commercial communication satellite operators

    NASA Technical Reports Server (NTRS)

    Price, Kent M.; Dixson, John E.; Weyandt, Charles J.

    1987-01-01

    The economic and financial aspects of newly defined space-based activities, procedures, and operations (APOs) and associated satellite system designs are presented that have the potential to improve economic performance of future geostationary communications satellites. Launch insurance, launch costs, and the economics of APOs are examined. Retrieval missions and various Space Station scenarios are addressed. The potential benefits of the new APOs to the commercial communications satellite system operator are quantified.

  10. Safety in earth orbit study. Volume 5: Space shuttle payloads: Safety requirements and guidelines on-orbit phase

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Safety requirements and guidelines are listed for the sortie module, upper stage vehicle, and space station for the earth orbit operations of the space shuttle program. The requirements and guidelines are for vehicle design, safety devices, warning devices, operational procedures, and residual hazards.

  11. An EarthScope Plate Boundary Observatory Progress Report

    NASA Astrophysics Data System (ADS)

    Jackson, M.; Anderson, G.; Blume, F.; Walls, C.; Coyle, B.; Feaux, K.; Friesen, B.; Phillips, D.; Hafner, K.; Johnson, W.; Mencin, D.; Pauk, B.; Dittmann, T.

    2007-12-01

    UNAVCO is building and operating the Plate Boundary Observatory (PBO), part of the NSF-funded EarthScope project to understand the structure, dynamics, and evolution of the North American continent. When complete in October 2008, the 875 GPS, 103 strain and seismic, and 28 tiltmeters stations will comprise the largest integrated geodetic and seismic network in United States and the second largest in the world. Data from the PBO network will facilitate research into plate boundary deformation with unprecedented scope and detail. As of 1 September 2007, UNAVCO had completed 680 PBO GPS stations and had upgraded 89% of the planned PBO Nucleus stations. Highlights of the past year's work include the expansion of the Alaska subnetwork to 95 continuously-operating stations, including coverage of Akutan and Augustine volcanoes and reconnaissance for future installations on Unimak Island; the installation of nine new stations on Mt. St. Helens; and the arrival of 33 permits for station installations on BLM land in Nevada. The Augustine network provided critical data on magmatic and volcanic processes associated with the 2005-2006 volcanic crisis, and has expanded to a total of 11 stations. Please visit http://pboweb.unavco.org/?pageid=3 for further information on PBO GPS network construction activities. As of September 2007, 41 PBO borehole stations had been installed and three laser strainmeter stations were operating, with a total of 60 borehole stations and 4 laser strainmeters expected by October 2007. In response to direction from the EarthScope community, UNAVCO installed a dense network of six stations along the San Jacinto Fault near Anza, California; installed three of four planned borehole strainmeter stations on Mt. St. Helens; and has densified coverage of the Parkfield area. Please visit http://pboweb.unavco.org/?pageid=8 for more information on PBO strainmeter network construction progress. The combined PBO/Nucleus GPS network provides 350 GB of raw standard

  12. LOD First Estimates In 7406 SLR San Juan Argentina Station

    NASA Astrophysics Data System (ADS)

    Pacheco, A.; Podestá, R.; Yin, Z.; Adarvez, S.; Liu, W.; Zhao, L.; Alvis Rojas, H.; Actis, E.; Quinteros, J.; Alacoria, J.

    2015-10-01

    In this paper we show results derived from satellite observations at the San Juan SLR station of Felix Aguilar Astronomical Observatory (OAFA). The Satellite Laser Ranging (SLR) telescope was installed in early 2006, in accordance with an international cooperation agreement between the San Juan National University (UNSJ) and the Chinese Academy of Sciences (CAS). The SLR has been in successful operation since 2011 using NAOC SLR software for the data processing. This program was designed to calculate satellite orbits and station coordinates, however it was used in this work for the determination of LOD (Length Of Day) time series and Earth Rotation speed.

  13. A radiological assessment of nuclear power and propulsion operations near Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Bolch, Wesley E.; Thomas, J. Kelly; Peddicord, K. Lee; Nelson, Paul; Marshall, David T.; Busche, Donna M.

    1990-01-01

    Scenarios were identified which involve the use of nuclear power systems in the vicinity of Space Station Freedom (SSF) and their radiological impact on the SSF crew was quantified. Several of the developed scenarios relate to the use of SSF as an evolutionary transportation node for lunar and Mars missions. In particular, radiation doses delivered to SSF crew were calculated for both the launch and subsequent return of a Nuclear Electric Propulsion (NEP) cargo vehicle and a Nuclear Thermal Rocket (NTR) personnel vehicle to low earth orbit. The use of nuclear power on co-orbiting platforms and the storage and handling issues associated with radioisotope power systems were also explored as they relate to SSF. A central philosophy in these analyses was the utilization of a radiation dose budget, defined as the difference between recommended dose limits from all radiation sources and estimated doses received by crew members from natural space radiations. Consequently, for each scenario examined, the dose budget concept was used to identify and quantify constraints on operational parameters such as launch separation distances, returned vehicle parking distances, and reactor shutdown times prior to vehicle approach. The results indicate that realistic scenarios do not exist which would preclude the use of nuclear power sources in the vicinity of SSF. The radiation dose to the SSF crew can be maintained at safe levels solely by implementing proper and reasonable operating procedures.

  14. International Space Station (ISS)

    NASA Image and Video Library

    2003-02-09

    This is the STS-115 insignia. This mission continued the assembly of the International Space Station (ISS) with the installation of the truss segments P3 and P4. Following the installation of the segments utilizing both the shuttle and the station robotic arms, a series of three space walks completed the final connections and prepared for the deployment of the station's second set of solar arrays. To reflect the primary mission of the flight, the patch depicts a solar panel as the main element. As the Space Shuttle Atlantis launches towards the ISS, its trail depicts the symbol of the Astronaut Office. The star burst, representing the power of the sun, rises over the Earth and shines on the solar panel. The shuttle flight number 115 is shown at the bottom of the patch, along with the ISS assembly designation 12A (the 12th American assembly mission). The blue Earth in the background reminds us of the importance of space exploration and research to all of Earth's inhabitants.

  15. Orbital and Landing Operations at Near-Earth

    NASA Technical Reports Server (NTRS)

    Scheeres, D. J.

    1995-01-01

    Orbital and landing operations about near-Earth asteroids are different than classical orbital operations about large bodies. The major differences lie with the small mass of the asteroid, the lower orbital velocities, the larger Solar tide and radiation pressure perturbations, the irregular shape of the asteroid and the potential for non-uniform rotation of the asteroid. These differences change the nature of orbits about an asteroid to where it is often common to find trajectories that evolve from stable, near-circular orbits to crashing or escaping orbits in a matter of days. The understanding and control of such orbits is important if a human or robotic presence at asteroids is to be commonplace in the future.

  16. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  17. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  18. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  19. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  20. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...