Science.gov

Sample records for earthquake management plan

  1. The plan to coordinate NEHRP post-earthquake investigations

    Holzer, Thomas L.; Borcherdt, Roger D.; Comartin, Craig D.; Hanson, Robert D.; Scawthorn, Charles R.; Tierney, Kathleen; Youd, T. Leslie

    2003-01-01

    This is the plan to coordinate domestic and foreign post-earthquake investigations supported by the National Earthquake Hazards Reduction Program (NEHRP). The plan addresses coordination of both the NEHRP agencies—Federal Emergency Management Agency (FEMA), National Institute of Standards and Technology (NIST), National Science Foundation (NSF), and U. S. Geological Survey (USGS)—and their partners. The plan is a framework for both coordinating what is going to be done and identifying responsibilities for post-earthquake investigations. It does not specify what will be done. Coordination is addressed in various time frames ranging from hours to years after an earthquake. The plan includes measures for (1) gaining rapid and general agreement on high-priority research opportunities, and (2) conducting the data gathering and fi eld studies in a coordinated manner. It deals with identifi cation, collection, processing, documentation, archiving, and dissemination of the results of post-earthquake work in a timely manner and easily accessible format.

  2. The California Earthquake Advisory Plan: A history

    Roeloffs, Evelyn A.; Goltz, James D.

    2017-01-01

    Since 1985, the California Office of Emergency Services (Cal OES) has issued advisory statements to local jurisdictions and the public following seismic activity that scientists on the California Earthquake Prediction Evaluation Council view as indicating elevated probability of a larger earthquake in the same area during the next several days. These advisory statements are motivated by statistical studies showing that about 5% of moderate earthquakes in California are followed by larger events within a 10-km, five-day space-time window (Jones, 1985; Agnew and Jones, 1991; Reasenberg and Jones, 1994). Cal OES issued four earthquake advisories from 1985 to 1989. In October, 1990, the California Earthquake Advisory Plan formalized this practice, and six Cal OES Advisories have been issued since then. This article describes that protocol’s scientific basis and evolution.

  3. Crisis management aspects of bam catastrophic earthquake: review article.

    PubMed

    Sadeghi-Bazargani, Homayoun; Azami-Aghdash, Saber; Kazemi, Abdolhassan; Ziapour, Behrad

    2015-01-01

    Bam earthquake was the most catastrophic natural disasters in recent years. The aim of this study was to review different aspects of crisis management during and after the catastrophic earthquake in Bam City, Iran. Data needed for this systematic review were collected through searching PubMed, EMBASE and SID databases, for the period from 2003 to 2011. Keywords included earthquake, Iran and Bam earthquake. The data were summarized and were analyzed using Content Analysis. Out of 422 articles, 25 articles were included in the study. Crisis Management aspects and existing pitfalls were classified into seven categories including planning and organization, human resource management, management of logistics, international humanitarian aids, field performance of the military and security forces, health and medical service provision, and information management. Positive aspects and major pitfalls of crisis management have been introduced in all the mentioned categories. The available evidence indicated poor crisis management during Bam earthquake that resulted in aggravating the losses as well as diminishing the effect of interventions. Thus, concerning the importance of different aspects of the crisis management and the high prevalence of disasters in Iran, the observed vulnerability in disaster management process should be addressed.

  4. POST Earthquake Debris Management — AN Overview

    NASA Astrophysics Data System (ADS)

    Sarkar, Raju

    Every year natural disasters, such as fires, floods, earthquakes, hurricanes, landslides, tsunami, and tornadoes, challenge various communities of the world. Earthquakes strike with varying degrees of severity and pose both short- and long-term challenges to public service providers. Earthquakes generate shock waves and displace the ground along fault lines. These seismic forces can bring down buildings and bridges in a localized area and damage buildings and other structures in a far wider area. Secondary damage from fires, explosions, and localized flooding from broken water pipes can increase the amount of debris. Earthquake debris includes building materials, personal property, and sediment from landslides. The management of this debris, as well as the waste generated during the reconstruction works, can place significant challenges on the national and local capacities. Debris removal is a major component of every post earthquake recovery operation. Much of the debris generated from earthquake is not hazardous. Soil, building material, and green waste, such as trees and shrubs, make up most of the volume of earthquake debris. These wastes not only create significant health problems and a very unpleasant living environment if not disposed of safely and appropriately, but also can subsequently impose economical burdens on the reconstruction phase. In practice, most of the debris may be either disposed of at landfill sites, reused as materials for construction or recycled into useful commodities Therefore, the debris clearance operation should focus on the geotechnical engineering approach as an important post earthquake issue to control the quality of the incoming flow of potential soil materials. In this paper, the importance of an emergency management perspective in this geotechnical approach that takes into account the different criteria related to the operation execution is proposed by highlighting the key issues concerning the handling of the construction

  5. POST Earthquake Debris Management - AN Overview

    NASA Astrophysics Data System (ADS)

    Sarkar, Raju

    Every year natural disasters, such as fires, floods, earthquakes, hurricanes, landslides, tsunami, and tornadoes, challenge various communities of the world. Earthquakes strike with varying degrees of severity and pose both short- and long-term challenges to public service providers. Earthquakes generate shock waves and displace the ground along fault lines. These seismic forces can bring down buildings and bridges in a localized area and damage buildings and other structures in a far wider area. Secondary damage from fires, explosions, and localized flooding from broken water pipes can increase the amount of debris. Earthquake debris includes building materials, personal property, and sediment from landslides. The management of this debris, as well as the waste generated during the reconstruction works, can place significant challenges on the national and local capacities. Debris removal is a major component of every post earthquake recovery operation. Much of the debris generated from earthquake is not hazardous. Soil, building material, and green waste, such as trees and shrubs, make up most of the volume of earthquake debris. These wastes not only create significant health problems and a very unpleasant living environment if not disposed of safely and appropriately, but also can subsequently impose economical burdens on the reconstruction phase. In practice, most of the debris may be either disposed of at landfill sites, reused as materials for construction or recycled into useful commodities Therefore, the debris clearance operation should focus on the geotechnical engineering approach as an important post earthquake issue to control the quality of the incoming flow of potential soil materials. In this paper, the importance of an emergency management perspective in this geotechnical approach that takes into account the different criteria related to the operation execution is proposed by highlighting the key issues concerning the handling of the construction

  6. The California Post-Earthquake Information Clearinghouse: A Plan to Learn From the Next Large California Earthquake

    NASA Astrophysics Data System (ADS)

    Loyd, R.; Walter, S.; Fenton, J.; Tubbesing, S.; Greene, M.

    2008-12-01

    In the rush to remove debris after a damaging earthquake, perishable data related to a wide range of impacts on the physical, built and social environments can be lost. The California Post-Earthquake Information Clearinghouse is intended to prevent this data loss by supporting the earth scientists, engineers, and social and policy researchers who will conduct fieldwork in the affected areas in the hours and days following the earthquake to study these effects. First called for by Governor Ronald Reagan following the destructive M6.5 San Fernando earthquake in 1971, the concept of the Clearinghouse has since been incorporated into the response plans of the National Earthquake Hazard Reduction Program (USGS Circular 1242). This presentation is intended to acquaint scientists with the purpose, functions, and services of the Clearinghouse. Typically, the Clearinghouse is set up in the vicinity of the earthquake within 24 hours of the mainshock and is maintained for several days to several weeks. It provides a location where field researchers can assemble to share and discuss their observations, plan and coordinate subsequent field work, and communicate significant findings directly to the emergency responders and to the public through press conferences. As the immediate response effort winds down, the Clearinghouse will ensure that collected data are archived and made available through "lessons learned" reports and publications that follow significant earthquakes. Participants in the quarterly meetings of the Clearinghouse include representatives from state and federal agencies, universities, NGOs and other private groups. Overall management of the Clearinghouse is delegated to the agencies represented by the authors above.

  7. Progress report on the Worldwide Earthquake Risk Management (WWERM) Program

    Algermissen, S.T.; Hays, Walter W.; Krumpe, Paul R.

    1992-01-01

    Considerable progress has been made in the Worldwide Earthquake Risk Management (WWERM) Program since its initiation in late 1989 as a cooperative program of the Agency for International Development (AID), Office of U.S. Foreign Disaster Assistance (OFDA), and the U.S. Geological Survey. Probabilistic peak acceleration and peak Modified Mercalli intensity (MMI) maps have been prepared for Chile and for Sulawesi province in Indonesia. Earthquake risk (loss) studies for dwellings in Gorontalo, North Sulawesi, have been completed and risk studies for dwellings in selected areas of central Chile are underway. A special study of the effect of site response on earthquake ground motion estimation in central Chile has also been completed and indicates that site response may modify the ground shaking by as much as plus or minus two units of MMI. A program for the development of national probabilistic ground motion maps for the Philippines is now underway and pilot studies of earthquake ground motion and risk are being planned for Morocco.

  8. Tsunami evacuation plans for future megathrust earthquakes in Padang, Indonesia, considering stochastic earthquake scenarios

    NASA Astrophysics Data System (ADS)

    Muhammad, Ario; Goda, Katsuichiro; Alexander, Nicholas A.; Kongko, Widjo; Muhari, Abdul

    2017-12-01

    This study develops tsunami evacuation plans in Padang, Indonesia, using a stochastic tsunami simulation method. The stochastic results are based on multiple earthquake scenarios for different magnitudes (Mw 8.5, 8.75, and 9.0) that reflect asperity characteristics of the 1797 historical event in the same region. The generation of the earthquake scenarios involves probabilistic models of earthquake source parameters and stochastic synthesis of earthquake slip distributions. In total, 300 source models are generated to produce comprehensive tsunami evacuation plans in Padang. The tsunami hazard assessment results show that Padang may face significant tsunamis causing the maximum tsunami inundation height and depth of 15 and 10 m, respectively. A comprehensive tsunami evacuation plan - including horizontal evacuation area maps, assessment of temporary shelters considering the impact due to ground shaking and tsunami, and integrated horizontal-vertical evacuation time maps - has been developed based on the stochastic tsunami simulation results. The developed evacuation plans highlight that comprehensive mitigation policies can be produced from the stochastic tsunami simulation for future tsunamigenic events.

  9. Burden and Management of Noncommunicable Diseases After Earthquakes and Tsunamis.

    PubMed

    Suneja, Amit; Gakh, Maxim; Rutkow, Lainie

    This integrative review examines extant literature assessing the burden and management of noncommunicable diseases 6 months or more after earthquakes and tsunamis. We conducted an integrative review to identify and characterize the strength of published studies about noncommunicable disease-specific outcomes and interventions at least 6 months after an earthquake and/or tsunami. We included disasters that occurred from 2004 to 2016. We focused primarily on the World Health Organization noncommunicable disease designations to define chronic disease, but we also included chronic renal disease, risk factors for noncommunicable diseases, and other chronic diseases or symptoms. After removing duplicates, our search yielded 6,188 articles. Twenty-five articles met our inclusion criteria, some discussing multiple noncommunicable diseases. Results demonstrate that existing medical conditions may worsen and subsequently improve, new diseases may develop, and risk factors, such as weight and cholesterol levels, may increase for several years after an earthquake and/or tsunami. We make 3 recommendations for practitioners and researchers: (1) plan for noncommunicable disease management further into the recovery period of disaster; (2) increase research on the burden of noncommunicable diseases, the treatment modalities employed, resulting population-level outcomes in the postdisaster setting, and existing models to improve stakeholder coordination and action regarding noncommunicable diseases after disasters; and (3) coordinate with preexisting provision networks, especially primary care.

  10. Wildland Fire Management Plan

    SciT

    Schwager, K.

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  11. Earthquakes

    MedlinePlus

    ... Search Term(s): Main Content Home Be Informed Earthquakes Earthquakes An earthquake is the sudden, rapid shaking of the earth, ... by the breaking and shifting of underground rock. Earthquakes can cause buildings to collapse and cause heavy ...

  12. Natural Resource Management Plan

    SciT

    Green, T.; Schwager, K.

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Naturalmore » Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.« less

  13. Risk Management Plan Rule

    EPA Pesticide Factsheets

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  14. Speed management program plan.

    DOT National Transportation Integrated Search

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  15. Wilderness fire management planning guide

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  16. Planning Matters: Response Operations following the 30 September 2009 Sumatran Earthquake

    NASA Astrophysics Data System (ADS)

    Comfort, L. K.; Cedillos, V.; Rahayu, H.

    2009-12-01

    Response operations following the 9/30/2009 West Sumatra earthquake tested extensive planning that had been done in Indonesia since the 26 December 2004 Sumatran Earthquake and Tsunami. After massive destruction in Aceh Province in 2004, the Indonesian National Government revised its national disaster management plans. A key component was to select six cities in Indonesia exposed to significant risk and make a focused investment of resources, planning activities, and public education to reduce risk of major disasters. Padang City was selected for this national “showcase” for disaster preparedness, planning, and response. The question is whether planning improved governmental performance and coordination in practice. There is substantial evidence that disaster preparedness planning and training initiated over the past four years had a positive effect on Padang in terms of disaster risk reduction. The National Disaster Management Agency (BNPB, 10/28/09) reported the following casualties: Padang City: deaths, 383; severe injuries, 431, minor injuries, 771. Province of West Sumatra: deaths, 1209; severe injuries, 67; minor injuries, 1179. These figures contrasted markedly with the estimated losses following the 2004 Earthquake and Tsunami when no training had been done: Banda Aceh, deaths, 118,000; Aceh Province, dead/missing, 236,169 (ID Health Ministry 2/22/05). The 2004 events were more severe, yet the comparable scale of loss was significantly lower in the 9/30/09 earthquake. Three factors contributed to reducing disaster risk in Padang and West Sumatra. First, annual training exercises for tsunami warning and evacuation had been organized by national agencies since 2004. In 2008, all exercises and training activities were placed under the newly established BNPB. The exercise held in Padang in February, 2009 served as an organizing framework for response operations in the 9/30/09 earthquake. Public officers with key responsibilities for emergency operations

  17. Earthquakes

    MedlinePlus

    An earthquake happens when two blocks of the earth suddenly slip past one another. Earthquakes strike suddenly, violently, and without warning at any time of the day or night. If an earthquake occurs in a populated area, it may cause ...

  18. Earthquakes.

    ERIC Educational Resources Information Center

    Pakiser, Louis C.

    One of a series of general interest publications on science topics, the booklet provides those interested in earthquakes with an introduction to the subject. Following a section presenting an historical look at the world's major earthquakes, the booklet discusses earthquake-prone geographic areas, the nature and workings of earthquakes, earthquake…

  19. Earthquakes.

    ERIC Educational Resources Information Center

    Walter, Edward J.

    1977-01-01

    Presents an analysis of the causes of earthquakes. Topics discussed include (1) geological and seismological factors that determine the effect of a particular earthquake on a given structure; (2) description of some large earthquakes such as the San Francisco quake; and (3) prediction of earthquakes. (HM)

  20. Sewer System Management Plan.

    SciT

    Holland, Robert C.

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  1. Management self assessment plan

    SciT

    Debban, B.L.

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less

  2. Earthquake Preparedness 101: Planning Guidelines for Colleges and Universities.

    ERIC Educational Resources Information Center

    California Governor's Office, Sacramento.

    This publication is a guide for California colleges and universities wishing to prepare for earthquakes. An introduction aimed at institutional leaders emphasizes that earthquake preparedness is required by law and argues that there is much that can be done to prepare for earthquakes. The second section, addressed to the disaster planner, offers…

  3. Medical waste management plan.

    SciT

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  4. Earthquake and Tsunami planning, outreach and awareness in Humboldt County, California

    NASA Astrophysics Data System (ADS)

    Ozaki, V.; Nicolini, T.; Larkin, D.; Dengler, L.

    2008-12-01

    Humboldt County has the longest coastline in California and is one of the most seismically active areas of the state. It is at risk from earthquakes located on and offshore and from tsunamis generated locally from faults associated with the Cascadia subduction zone (CSZ), other regional fault systems, and from distant sources elsewhere in the Pacific. In 1995 the California Division of Mines and Geology published the first earthquake scenario to include both strong ground shaking effects and a tsunami. As a result of the scenario, the Redwood Coast Tsunami Work Group (RCTWG), an organization of representatives from government agencies, tribes, service groups, academia and the private sector from the three northern coastal California counties, was formed in 1996 to coordinate and promote earthquake and tsunami hazard awareness and mitigation. The RCTWG and its member agencies have sponsored a variety of projects including education/outreach products and programs, tsunami hazard mapping, signage and siren planning, and has sponsored an Earthquake - Tsunami Education Room at the Humboldt County fair for the past eleven years. Three editions of Living on Shaky Ground an earthquake-tsunami preparedness magazine for California's North Coast, have been published since 1993 and a fourth is due to be published in fall 2008. In 2007, Humboldt County was the first region in the country to participate in a tsunami training exercise at FEMA's Emergency Management Institute in Emmitsburg, MD and the first area in California to conduct a full-scale tsunami evacuation drill. The County has conducted numerous multi-agency, multi-discipline coordinated exercises using county-wide tsunami response plan. Two Humboldt County communities were recognized as TsunamiReady by the National Weather Service in 2007. Over 300 tsunami hazard zone signs have been posted in Humboldt County since March 2008. Six assessment surveys from 1993 to 2006 have tracked preparedness actions and personal

  5. Region 7 Quality Management Plan

    EPA Pesticide Factsheets

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  6. Strategic Planning and Financial Management

    ERIC Educational Resources Information Center

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  7. Crisis management of tohoku; Japan earthquake and tsunami, 11 march 2011.

    PubMed

    Zaré, M; Afrouz, S Ghaychi

    2012-01-01

    The huge earthquake in 11 March 2012 which followed by a destructive tsunami in Japan was largest recorded earthquake in the history. Japan is pioneer in disaster management, especially earthquakes. How this developed country faced this disaster, which had significant worldwide effects? The humanitarian behavior of the Japanese people amazingly wondered the word's media, meanwhile the management of government and authorities showed some deficiencies. The impact of the disaster is followed up after the event and the different impacts are tried to be analyzed in different sectors. The situation one year after Japan 2011 earthquake and Tsunami is overviewed. The reason of Japanese plans failure was the scale of tsunami, having higher waves than what was assumed, especially in the design of the Nuclear Power Plant. Japanese authorities considered economic benefits more than safety and moral factors exacerbate the situation. Major lessons to be learnt are 1) the effectiveness of disaster management should be restudied in all hazardous countries; 2) the importance of the high-Tech early-warning systems in reducing risk; 3) Reconsidering of extreme values expected/possible hazard and risk levels is necessary; 4) Morality and might be taken as an important factor in disaster management; 5) Sustainable development should be taken as the basis for reconstruction after disaster.

  8. Crisis Management of Tohoku; Japan Earthquake and Tsunami, 11 March 2011

    PubMed Central

    Zaré, M; Afrouz, S Ghaychi

    2012-01-01

    The huge earthquake in 11 March 2012 which followed by a destructive tsunami in Japan was largest recorded earthquake in the history. Japan is pioneer in disaster management, especially earthquakes. How this developed country faced this disaster, which had significant worldwide effects? The humanitarian behavior of the Japanese people amazingly wondered the word’s media, meanwhile the management of government and authorities showed some deficiencies. The impact of the disaster is followed up after the event and the different impacts are tried to be analyzed in different sectors. The situation one year after Japan 2011 earthquake and Tsunami is overviewed. The reason of Japanese plans failure was the scale of tsunami, having higher waves than what was assumed, especially in the design of the Nuclear Power Plant. Japanese authorities considered economic benefits more than safety and moral factors exacerbate the situation. Major lessons to be learnt are 1) the effectiveness of disaster management should be restudied in all hazardous countries; 2) the importance of the high-Tech early-warning systems in reducing risk; 3) Reconsidering of extreme values expected/possible hazard and risk levels is necessary; 4) Morality and might be taken as an important factor in disaster management; 5) Sustainable development should be taken as the basis for reconstruction after disaster. PMID:23113189

  9. Innovative Traffic Management Following The 1994 Northridge Earthquake

    DOT National Transportation Integrated Search

    1995-08-09

    IT IS OFTEN NECESSARY TO STUDY THE METHODOLOGY OF WHAT WAS DONE TO KEEP A SOCIETY MOVING WHEN DISASTER STRIKES. OTHERS MAY LOOK BACK ON THOSE METHODS TO HELP THEM IN THEIR TIMES OF NEED. THE TRAFFIC MANAGEMENT FOLLOWING THE 1994 NORTHRIDGE EARTHQUAKE...

  10. Crisis management and disaster planning: some recent lessons.

    PubMed

    1989-11-01

    Two recent disasters--Hurricane Hugo and the San Francisco-Oakland area earthquake--put a number of hospitals (and their disaster plans) to the text this fall. In future issues, we will present details on how hospitals faced those emergencies. The need for crisis management and disaster planning, however, is not limited to natural disasters like hurricanes, earthquakes, tornadoes, or floods. Man-made disasters, both internal and external, can occur virtually at any time. These include accidents, terrorists bombs, fires, explosions, and toxic chemical spills. In this report, we will present the key elements of a crisis management plan, as well as some expert pointers on what to include in a disaster plan. We will give you details on how two hospitals fared when a major air crash occurred in their community. We will tell you some of the things they would do differently, and we will also describe how an interagency disaster planning committee responded.

  11. Environmental Management System Plan

    SciT

    Fox, Robert; Thorson, Patrick; Horst, Blair

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and othermore » natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan

  12. Simulation and monitoring tools to protect disaster management facilities against earthquakes

    NASA Astrophysics Data System (ADS)

    Saito, Taiki

    2017-10-01

    The earthquakes that hit Kumamoto Prefecture in Japan on April 14 and 16, 2016 severely damaged over 180,000 houses, including over 8,000 that were completely destroyed and others that were partially damaged according to the Cabinet Office's report as of November 14, 2016 [1]. Following these earthquakes, other parts of the world have been struck by earthquakes including Italy and New Zealand as well as the central part of Tottori Prefecture in October, where the earthquake-induced collapse of buildings has led to severe damage and casualties. The earthquakes in Kumamoto Prefecture, in fact, damaged various disaster management facilities including Uto City Hall, which significantly hindered the city's evacuation and recovery operations. One of the most crucial issues in times of disaster is securing the functions of disaster management facilities such as city halls, hospitals and fire stations. To address this issue, seismic simulations are conducted on the East and the West buildings of Toyohashi City Hall using the analysis tool developed by the author, STERA_3D, with the data of the ground motion waveform prediction for the Nankai Trough earthquake provided by the Ministry of Land, Infrastructure, Transport and Tourism. As the result, it was found that the buildings have sufficient earthquake resistance. It turned out, however, that the west building is at risk for wall cracks or ceiling panel's collapse while in the east building, people would not be able to stand through the strong quakes of 7 on the seismic intensity scale and cabinets not secured to the floors or walls would fall over. Additionally, three IT strong-motion seismometers were installed in the city hall to continuously monitor vibrations. Every five minutes, the vibration data obtained by the seismometers are sent to the computers in Toyohashi University of Technology via the Internet for the analysis tools to run simulations in the cloud. If an earthquake strikes, it is able to use the results

  13. Earthquake!

    ERIC Educational Resources Information Center

    Hernandez, Hildo

    2000-01-01

    Examines the types of damage experienced by California State University at Northridge during the 1994 earthquake and what lessons were learned in handling this emergency are discussed. The problem of loose asbestos is addressed. (GR)

  14. TWRS Configuration management program plan

    SciT

    Vann, J.M.

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  15. Geoethics and decision science issues in Japan's disaster management system: case study in the 2011 Tohoku earthquake and tsunami

    NASA Astrophysics Data System (ADS)

    Sugimoto, Megumi

    2015-04-01

    The March 11, 2011 Tohoku earthquake and its tsunami killed 18,508 people, including the missing (National Police Agency report as of April 2014) and raise the Level 7 accident at TEPCO's Fukushima Dai-ichi nuclear power station in Japan. The problems revealed can be viewed as due to a combination of risk-management, risk-communication, and geoethics issues. Japan's preparations for earthquakes and tsunamis are based on the magnitude of the anticipated earthquake for each region. The government organization coordinating the estimation of anticipated earthquakes is the "Headquarters for Earthquake Research Promotion" (HERP), which is under the Ministry of Education, Culture, Sports, Science and Technology (MEXT). Japan's disaster mitigation system is depicted schematically as consisting of three layers: seismology, civil engineering, and disaster mitigation planning. This research explains students in geoscience should study geoethics as part of their education related Tohoku earthquake and the Level 7 accident at TEPCO's Fukushima Dai-ichi nuclear power station. Only when they become practicing professionals, they will be faced with real geoethical dilemmas. A crisis such as the 2011 earthquake, tsunami, and Fukushima Dai-ichi nuclear accident, will force many geoscientists to suddenly confront previously unanticipated geoethics and risk-communication issues. One hopes that previous training will help them to make appropriate decisions under stress. We name it "decision science".

  16. Types of Managed Care Plans

    MedlinePlus

    ... AAP Find a Pediatrician Family Life Medical Home Health Insurance Pediatric Specialists Family Dynamics Media Work & Play Getting ... Your Community Healthy Children > Family Life > Medical Home > Health Insurance > Types of Managed Care Plans Family Life Listen ...

  17. Developing formal asset management plans

    DOT National Transportation Integrated Search

    2014-06-01

    This report highlights key recommendations and best practices identified at the peer exchange on Transportation Asset Management Plans (TAMP), held on February 5 and 6, 2014, in Columbia, South Carolina. This event was sponsored by the Transportation...

  18. Construction Management: Planning Ahead.

    ERIC Educational Resources Information Center

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  19. The Development of an Earthquake Preparedness Plan for a Child Care Center in a Geologically Hazardous Region.

    ERIC Educational Resources Information Center

    Wokurka, Linda

    The director of a child care center at a community college in California developed an earthquake preparedness plan for the center which met state and local requirements for earthquake preparedness at schools. The plan consisted of: (1) the identification and reduction of nonstructural hazards in classrooms, office, and staff rooms; (2) storage of…

  20. Business Continuity Management Plan

    DTIC Science & Technology

    2014-12-01

    organization ( Shaw , 2004). Navy Supply Systems Command (NAVSUP) does not have a framework that can help develop a business continuity management (BCM...cites two case studies that demonstrate how an organization mitigated issues during catastrophic events that led to disruptions to their business ...www.uschamber.com/sites/default/files/legacy/ issues /defense/files/guideli nesbc.pdf Comprehensive Emergency Management Associates. (2006). Business continuity

  1. Teachers' Plans for Managing Students.

    ERIC Educational Resources Information Center

    Pittman, Sherry I.

    A study of three first grade teachers, who were interviewed and observed in the classroom setting, demonstrates a link between teachers' plans for action that they have developed over years of teaching and their routine management of students during reading. Both management and instructional goals, embedded in teacher beliefs about learning and…

  2. Total Quality Management Implementation Plan.

    DTIC Science & Technology

    1989-06-01

    Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM (Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16

  3. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  4. Underground storage tank management plan

    SciT

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less

  5. A reservoir management plan

    SciT

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital formore » planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.« less

  6. Overview of the critical disaster management challenges faced during Van 2011 earthquakes.

    PubMed

    Tolon, Mert; Yazgan, Ufuk; Ural, Derin N; Goss, Kay C

    2014-01-01

    On October 23, 2011, a M7.2 earthquake caused damage in a widespread area in the Van province located in eastern Turkey. This strong earthquake was followed by a M5.7 earthquake on November 9, 2011. This sequence of damaging earthquakes led to 644 fatalities. The management during and after these earthquake disaster imposed many critical challenges. In this article, an overview of these challenges is presented based on the observations by the authors in the aftermath of this disaster. This article presents the characteristics of 2011 Van earthquakes. Afterward, the key information related to the four main phases (ie, preparedness, mitigation, response, and recovery) of the disaster in Van is presented. The potential strategies that can be taken to improve the disaster management practice are identified, and a set of recommendations are proposed to improve the existing situation.

  7. Halon 1301 management planning guidance

    NASA Astrophysics Data System (ADS)

    1995-05-01

    This ETL provides guidance to help the Base Civil Engineer (BCE) and other users manage inventories of Halon 1301, an ozone depleting substance used in many facility fire protection systems. This guidance will allow Halon 1301 users to develop the transition plans necessary to implement the DOD and Air Force policies on ozone depleting substances. Attachment 3 to this ETL contains detailed instructions on how to develop a Base Halon 1 301 Management Plan and comply with Air Force policies and regulations designed to minimize dependency on Halon 1301.

  8. Niagara River Toxics Management Plan

    EPA Pesticide Factsheets

    This 2007 Progress Report of the Niagara River Toxics Management Plan (NRTMP) summarizes progress made by the four parties in dealing with the 18 “Priority Toxics” through reductions in point and non-point sources to the Niagara River.

  9. Rhode Island congestion management plan : executive summary

    DOT National Transportation Integrated Search

    1997-09-01

    This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...

  10. GIS Based System for Post-Earthquake Crisis Managment Using Cellular Network

    NASA Astrophysics Data System (ADS)

    Raeesi, M.; Sadeghi-Niaraki, A.

    2013-09-01

    Earthquakes are among the most destructive natural disasters. Earthquakes happen mainly near the edges of tectonic plates, but they may happen just about anywhere. Earthquakes cannot be predicted. Quick response after disasters, like earthquake, decreases loss of life and costs. Massive earthquakes often cause structures to collapse, trapping victims under dense rubble for long periods of time. After the earthquake and destroyed some areas, several teams are sent to find the location of the destroyed areas. The search and rescue phase usually is maintained for many days. Time reduction for surviving people is very important. A Geographical Information System (GIS) can be used for decreasing response time and management in critical situations. Position estimation in short period of time time is important. This paper proposes a GIS based system for post-earthquake disaster management solution. This system relies on several mobile positioning methods such as cell-ID and TA method, signal strength method, angel of arrival method, time of arrival method and time difference of arrival method. For quick positioning, the system can be helped by any person who has a mobile device. After positioning and specifying the critical points, the points are sent to a central site for managing the procedure of quick response for helping. This solution establishes a quick way to manage the post-earthquake crisis.

  11. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  12. Survey, Hbim and Conservation Plan of a Monumental Building Damaged by Earthquake

    NASA Astrophysics Data System (ADS)

    Oreni, D.; Brumana, R.; Della Torre, S.; Banfi, F.

    2017-05-01

    constructive logic of each structural element; then it was used as a support tool for the restoration simulation, project, management and yard. To perform the division of the building in its constructive elements, sometimes it has been used stratigraphic methodologies and instruments of analysis. The entirety of the geometric and structural complexity of the basilica, was guarantee using sophisticated 3D software and drawing complex entities, integrated and stored in the parametric BIM logic. This process has allowed to accurately and timely represent the geometry of the structural elements, of the areas characterized by crushing, empties, variations of the masonry sections and out of plumbs. It is on the pillars of the nave that was focused the attention of survey: the will to preserve as much as possible the existing structures, in their material authenticity, required a careful analysis of each individual stone element of each pillar, investigated in its geometry, texture and state of conservation. The aim of the project was to ward a complete replacement of the pillars, preferring instead a removing and replacing intervention of only of the stone ashlars completely deteriorated and no longer recoverable, considering the question of structural safety as fundamental. The HBIM of the basilica had the primary function of connecting into one virtual space all the available data; that model has also been made as a tool for managing the restoration yard, supporting the computation of stone to buy, quarry and grossly slot, saving time on site. Different and complementary skills were used in every knowledge and restoration steps; the accurate analysis of the structures made it possible to plan a consolidation and restoration project as close as possible to the structural conception of the existing building, adding only the new structural elements necessary to increase the resistance and to guarantee the safety of the structures, also in case of new earthquake. The Italian Codice

  13. Food, water, and fault lines: Remote sensing opportunities for earthquake-response management of agricultural water.

    PubMed

    Rodriguez, Jenna; Ustin, Susan; Sandoval-Solis, Samuel; O'Geen, Anthony Toby

    2016-09-15

    Earthquakes often cause destructive and unpredictable changes that can affect local hydrology (e.g. groundwater elevation or reduction) and thus disrupt land uses and human activities. Prolific agricultural regions overlie seismically active areas, emphasizing the importance to improve our understanding and monitoring of hydrologic and agricultural systems following a seismic event. A thorough data collection is necessary for adequate post-earthquake crop management response; however, the large spatial extent of earthquake's impact makes challenging the collection of robust data sets for identifying locations and magnitude of these impacts. Observing hydrologic responses to earthquakes is not a novel concept, yet there is a lack of methods and tools for assessing earthquake's impacts upon the regional hydrology and agricultural systems. The objective of this paper is to describe how remote sensing imagery, methods and tools allow detecting crop responses and damage incurred after earthquakes because a change in the regional hydrology. Many remote sensing datasets are long archived with extensive coverage and with well-documented methods to assess plant-water relations. We thus connect remote sensing of plant water relations to its utility in agriculture using a post-earthquake agrohydrologic remote sensing (PEARS) framework; specifically in agro-hydrologic relationships associated with recent earthquake events that will lead to improved water management. Copyright © 2016 Elsevier B.V. All rights reserved.

  14. SDDOT transportation systems management & operations program plan.

    DOT National Transportation Integrated Search

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  15. The Lisbon earthquake and its aftershocks in European Enlightenment thinking and planning practice

    NASA Astrophysics Data System (ADS)

    de Meyer, Dirk

    2010-05-01

    From the Old Testament to Hollywood B-movies, from Sodom and Gomorrah to Los Angeles, the city is the topos of cataclysm. The first city-wide catastrophe that would have a major impact on modern European thinking was the earthquake and tsunami that, in 1755, reduced Lisbon to ruins, and killed about one tenth of its population. This paper will look at the contemporary representations of that catastrophe and at its impact on European Enlightenment thinking and urban planning practices. For Voltaire and Kant the Lisbon disaster had a major impact on the development of there philosophical and esthetical concepts. It strenghtend Rousseau in his anti-urban thinking. For many others it gave way to that modern concept that later will be coined by Paul Valéry in his opening sentence of La crise de l'esprit: "we civilizations now know that we are mortal." I will argue more in detail how, contrary to the rebuilding after the fire of London, where both proposed and realised plans hardly represented a radical new way of conceiving a city plan, the Lisbon reconstruction under the direction of the King's Prime Minister Pombal, can be understood as the start of urban planning as a modern practice — as opposed to earlier, architect-directed Renaissance and Baroque planning. On a smaller scale we will look at the implementation, in the aftermath of the earthquake. of new anti-seismic building techniques in Lisbon's new constructions.

  16. Suicide Management Plan--Post Suicide Response.

    ERIC Educational Resources Information Center

    Imhoff, Robert; Royster, Sharon

    This document contains a suicide management plan developed specifically for colleges. The suicide management plan described includes pre-planning, immediate response to the event, press releases, college staff jobs, college responses (such as memorials or scholarships), interaction with the family, and staff counseling. The plan is presented as a…

  17. FEMA's Earthquake Incident Journal: A Web-Based Data Integration and Decision Support Tool for Emergency Management

    NASA Astrophysics Data System (ADS)

    Jones, M.; Pitts, R.

    2017-12-01

    For emergency managers, government officials, and others who must respond to rapidly changing natural disasters, timely access to detailed information related to affected terrain, population and infrastructure is critical for planning, response and recovery operations. Accessing, analyzing and disseminating such disparate information in near real-time are critical decision support components. However, finding a way to handle a variety of informative yet complex datasets poses a challenge when preparing for and responding to disasters. Here, we discuss the implementation of a web-based data integration and decision support tool for earthquakes developed by the Federal Emergency Management Agency (FEMA) as a solution to some of these challenges. While earthquakes are among the most well- monitored and measured of natural hazards, the spatially broad impacts of shaking, ground deformation, landslides, liquefaction, and even tsunamis, are extremely difficult to quantify without accelerated access to data, modeling, and analytics. This web-based application, deemed the "Earthquake Incident Journal", provides real-time access to authoritative and event-specific data from external (e.g. US Geological Survey, NASA, state and local governments, etc.) and internal (FEMA) data sources. The journal includes a GIS-based model for exposure analytics, allowing FEMA to assess the severity of an event, estimate impacts to structures and population in near real-time, and then apply planning factors to exposure estimates to answer questions such as: What geographic areas are impacted? Will federal support be needed? What resources are needed to support survivors? And which infrastructure elements or essential facilities are threatened? This presentation reviews the development of the Earthquake Incident Journal, detailing the data integration solutions, the methodology behind the GIS-based automated exposure model, and the planning factors as well as other analytical advances that

  18. Solid Waste Management Plan. Revision 4

    SciT

    NONE

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  19. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including...

  20. Integrating fire management analysis into land management planning

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  1. Earthquake Early Warning Management based on Client-Server using Primary Wave data from Vibrating Sensor

    NASA Astrophysics Data System (ADS)

    Laumal, F. E.; Nope, K. B. N.; Peli, Y. S.

    2018-01-01

    Early warning is a warning mechanism before an actual incident occurs, can be implemented on natural events such as tsunamis or earthquakes. Earthquakes are classified in tectonic and volcanic types depend on the source and nature. The tremor in the form of energy propagates in all directions as Primary and Secondary waves. Primary wave as initial earthquake vibrations propagates longitudinally, while the secondary wave propagates like as a sinusoidal wave after Primary, destructive and as a real earthquake. To process the primary vibration data captured by the earthquake sensor, a network management required client computer to receives primary data from sensors, authenticate and forward to a server computer to set up an early warning system. With the water propagation concept, a method of early warning system has been determined in which some sensors are located on the same line, sending initial vibrations as primary data on the same scale and the server recommended to the alarm sound as an early warning.

  2. The Northern California Earthquake Management System: A Unified System From Realtime Monitoring to Data Distribution

    NASA Astrophysics Data System (ADS)

    Neuhauser, D.; Dietz, L.; Lombard, P.; Klein, F.; Zuzlewski, S.; Kohler, W.; Hellweg, M.; Luetgert, J.; Oppenheimer, D.; Romanowicz, B.

    2006-12-01

    The longstanding cooperation between the USGS Menlo Park and UC Berkeley's Seismological Laboratory for monitoring earthquakes and providing data to the research community is achieving a new level of integration. While station support and data collection for each network (NC, BK, BP) remain the responsibilities of the host institution, picks, codas and amplitudes will be produced and shared between the data centers continuously. Thus, realtime earthquake processing from triggering and locating through magnitude and moment tensor calculation and Shakemap production will take place independently at both locations, improving the robustness of event reporting in the Northern California Earthquake Management Center. Parametric data will also be exchanged with the Southern California Earthquake Management System to allow statewide earthquake detection and processing for further redundancy within the California Integrated Seismic Network (CISN). The database plays an integral part in this system, providing the coordination for event processing as well as the repository for event, instrument (metadata) and waveform information. The same master database serves both realtime processing, data quality control and archival, and the data center which provides waveforms and earthquake data to users in the research community. Continuous waveforms from all BK, BP, and NC stations, event waveform gathers, and event information automatically become available at the Northern California Earthquake Data Center (NCEDC). Currently, the NCEDC is collecting and makes available over 4 TByes of data per year from the NCEMC stations and other seismic networks, as well as from GPS and and other geophysical instrumentation.

  3. Web-Based Real Time Earthquake Forecasting and Personal Risk Management

    NASA Astrophysics Data System (ADS)

    Rundle, J. B.; Holliday, J. R.; Graves, W. R.; Turcotte, D. L.; Donnellan, A.

    2012-12-01

    Earthquake forecasts have been computed by a variety of countries and economies world-wide for over two decades. For the most part, forecasts have been computed for insurance, reinsurance and underwriters of catastrophe bonds. One example is the Working Group on California Earthquake Probabilities that has been responsible for the official California earthquake forecast since 1988. However, in a time of increasingly severe global financial constraints, we are now moving inexorably towards personal risk management, wherein mitigating risk is becoming the responsibility of individual members of the public. Under these circumstances, open access to a variety of web-based tools, utilities and information is a necessity. Here we describe a web-based system that has been operational since 2009 at www.openhazards.com and www.quakesim.org. Models for earthquake physics and forecasting require input data, along with model parameters. The models we consider are the Natural Time Weibull (NTW) model for regional earthquake forecasting, together with models for activation and quiescence. These models use small earthquakes ('seismicity-based models") to forecast the occurrence of large earthquakes, either through varying rates of small earthquake activity, or via an accumulation of this activity over time. These approaches use data-mining algorithms combined with the ANSS earthquake catalog. The basic idea is to compute large earthquake probabilities using the number of small earthquakes that have occurred in a region since the last large earthquake. Each of these approaches has computational challenges associated with computing forecast information in real time. Using 25 years of data from the ANSS California-Nevada catalog of earthquakes, we show that real-time forecasting is possible at a grid scale of 0.1o. We have analyzed the performance of these models using Reliability/Attributes and standard Receiver Operating Characteristic (ROC) tests. We show how the Reliability and

  4. Global building inventory for earthquake loss estimation and risk management

    Jaiswal, Kishor; Wald, David; Porter, Keith

    2010-01-01

    We develop a global database of building inventories using taxonomy of global building types for use in near-real-time post-earthquake loss estimation and pre-earthquake risk analysis, for the U.S. Geological Survey’s Prompt Assessment of Global Earthquakes for Response (PAGER) program. The database is available for public use, subject to peer review, scrutiny, and open enhancement. On a country-by-country level, it contains estimates of the distribution of building types categorized by material, lateral force resisting system, and occupancy type (residential or nonresidential, urban or rural). The database draws on and harmonizes numerous sources: (1) UN statistics, (2) UN Habitat’s demographic and health survey (DHS) database, (3) national housing censuses, (4) the World Housing Encyclopedia and (5) other literature.

  5. PROPOSAL FOR IMPROVEMENT OF BUINESS CONTINUITY PLAN (BCP) BASED ON THE LESSONS OF THE GREAT EAST JAPAN EARTHQUAKE

    NASA Astrophysics Data System (ADS)

    Maruya, Hiroaki

    For most Japanese companies and organizations, the enormous damage of the Great East Japan Earthquake was more than expected. In addition to great tsunami and earthquake motion, the lack of electricity and fuel disturbed to business activities seriously, and they should be considered important constraint factors in future earthquakes. Furthermore, disruption of supply chains also led considerable decline of production in many industries across Japan and foreign countries. Therefore it becomes urgent need for Japanese government and industries to utilize the lessons of the Great Earthquake and execute effective countermeasures, considering great earthquakes such as Tonankai & Nankai earthquakes and Tokyo Inland Earthquakes. Obviously most basic step is improving earthquake-resistant ability of buildings and facilities. In addition the spread of BCP and BCM to enterprises and organizations is indispensable. Based on the lessons, the BCM should include the point of view of the supply chain management more clearly, and emphasize "substitute strategy" more explicitly because a company should survive even if it completely loses its present production base. The central and local governments are requested, in addition to develop their own BCP, to improve related systematic conditions for BCM of the private sectors.

  6. CCSF Management Plan, 2002/2003.

    ERIC Educational Resources Information Center

    City Coll. of San Francisco, CA.

    This is the 2001-2002 management plan for the City College of San Francisco (CCSF), California. The plan contains the following sections: (1) Overview of Planning and Budgeting; (2) Vision, Values, and Mission; (3) College Goals and Strategic Priorities; (4) Annual Institutional Plan CCSF 2002-03; (5) College Core Performance Indicators; and (6)…

  7. Oak Ridge Reservation Waste Management Plan

    SciT

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  8. FY 2016 - Stockpile Stewardship and Management Plan

    SciT

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  9. Volcano and Earthquake Monitoring Plan for the Yellowstone Volcano Observatory, 2006-2015

    ,

    2006-01-01

    To provide Yellowstone National Park (YNP) and its surrounding communities with a modern, comprehensive system for volcano and earthquake monitoring, the Yellowstone Volcano Observatory (YVO) has developed a monitoring plan for the period 2006-2015. Such a plan is needed so that YVO can provide timely information during seismic, volcanic, and hydrothermal crises and can anticipate hazardous events before they occur. The monitoring network will also provide high-quality data for scientific study and interpretation of one of the largest active volcanic systems in the world. Among the needs of the observatory are to upgrade its seismograph network to modern standards and to add five new seismograph stations in areas of the park that currently lack adequate station density. In cooperation with the National Science Foundation (NSF) and its Plate Boundary Observatory Program (PBO), YVO seeks to install five borehole strainmeters and two tiltmeters to measure crustal movements. The boreholes would be located in developed areas close to existing infrastructure and away from sensitive geothermal features. In conjunction with the park's geothermal monitoring program, installation of new stream gages, and gas-measuring instruments will allow YVO to compare geophysical phenomena, such as earthquakes and ground motions, to hydrothermal events, such as anomalous water and gas discharge. In addition, YVO seeks to characterize the behavior of geyser basins, both to detect any precursors to hydrothermal explosions and to monitor earthquakes related to fluid movements that are difficult to detect with the current monitoring system. Finally, a monitoring network consists not solely of instruments, but requires also a secure system for real-time transmission of data. The current telemetry system is vulnerable to failures that could jeopardize data transmission out of Yellowstone. Future advances in monitoring technologies must be accompanied by improvements in the infrastructure for

  10. Nurse manager succession planning: a concept analysis.

    PubMed

    Titzer, Jennifer L; Shirey, Maria R

    2013-01-01

    The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.

  11. Seeking Information after the 2010 Haiti Earthquake: A Case Study in Mass-Fatality Management

    ERIC Educational Resources Information Center

    Gupta, Kailash

    2013-01-01

    The 2010 earthquake in Haiti, which killed an estimated 316,000 people, offered many lessons in mass-fatality management (MFM). The dissertation defined MFM in seeking information and in recovery, preservation, identification, and disposition of human remains. Specifically, it examined how mass fatalities were managed in Haiti, how affected…

  12. I-15 integrated corridor management system : project management plan.

    DOT National Transportation Integrated Search

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...

  13. Tank waste remediation system configuration management plan

    SciT

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  14. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  15. Solid Waste Management Planning--A Methodology

    ERIC Educational Resources Information Center

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  16. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...

  17. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...

  18. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...

  19. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...

  20. The United Kingdom's School Asset Management Plans.

    ERIC Educational Resources Information Center

    Jones, Alan

    1999-01-01

    Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…

  1. Managing Dualities in Planned Change Initiatives

    ERIC Educational Resources Information Center

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  2. Volunteered Geographic Information for Disaster Management with Application to Earthquake Disaster Databank & Sharing Platform

    NASA Astrophysics Data System (ADS)

    Chen, H.; Zhang, W. C.; Deng, C.; Nie, N.; Yi, L.

    2017-02-01

    All phases of disaster management require up-to-date and accurate information. Different in-situ and remote sensor systems help to monitor dynamic properties such as air quality, water level or inundated areas. The rapid emergence of web-based services has facilitated the collection, dissemination, and cartographic representation of spatial information from the public, giving rise to the idea of using Volunteered Geographic Information (VGI) to aid disaster management. In this study, with a brief review on the concept and the development of disaster management, opportunities and challenges for applying VGI in disaster management were explored. The challenges, including Data availability, Data quality, Data management and Legal issues of using VGI for disaster management, were discussed in detail with particular emphasis on the actual needs of disaster management practice in China. Three different approaches to assure VGI data quality, namely the classification and authority design of volunteers, a government-led VGI data acquisition framework for disaster management and a quality assessment system for VGI, respectively, were presented and discussed. As a case study, a prototype of VGI oriented earthquake disaster databank & sharing platform, an open WebGIS system for volunteers and other interested individuals collaboratively create and manage the earthquake disaster related information, was proposed, to provide references for improving the level of earthquake emergency response and disaster mitigation in China.

  3. Menstrual hygiene management among women and adolescent girls in the aftermath of the earthquake in Nepal.

    PubMed

    Budhathoki, Shyam Sundar; Bhattachan, Meika; Castro-Sánchez, Enrique; Sagtani, Reshu Agrawal; Rayamajhi, Rajan Bikram; Rai, Pramila; Sharma, Gaurav

    2018-02-02

    Menstrual hygiene management (MHM) is an essential aspect of hygiene for women and adolescent girls between menarche and menopause. Despite being an important issue concerning women and girls in the menstruating age group MHM is often overlooked in post-disaster responses. Further, there is limited evidence of menstrual hygiene management in humanitarian settings. This study aims to describe the experiences and perceptions of women and adolescent girls on menstrual hygiene management in post-earthquake Nepal. A mixed methods study was carried out among the earthquake affected women and adolescent girls in three villages of Sindhupalchowk district of Nepal. Data was collected using a semi-structured questionnaire that captured experiences and perceptions of respondents on menstrual hygiene management in the aftermath of the Nepal earthquake. Quantitative data were triangulated with in-depth interview regarding respondent's personal experiences of menstrual hygiene management. Menstrual hygiene was rated as the sixth highest overall need and perceived as an immediate need by 18.8% of the respondents. There were 42.8% women & girls who menstruated within first week of the earthquake. Reusable sanitary cloth were used by about 66.7% of the respondents before the earthquake and remained a popular method (76.1%) post-earthquake. None of the respondents reported receiving menstrual adsorbents as relief materials in the first month following the earthquake. Disposable pads (77.8%) were preferred by respondents as they were perceived to be clean and convenient to use. Most respondents (73.5%) felt that reusable sanitary pads were a sustainable choice. Women who were in the age group of 15-34 years (OR = 3.14; CI = (1.07-9.20), did not go to school (OR = 9.68; CI = 2.16-43.33), married (OR = 2.99; CI = 1.22-7.31) and previously used reusable sanitary cloth (OR = 5.82; CI = 2.33-14.55) were more likely to use the reusable sanitary cloth. In

  4. Earthquake parametrics based protection for microfinance disaster management in Indonesia

    NASA Astrophysics Data System (ADS)

    Sedayo, M. H.; Damanik, R.

    2017-07-01

    Financial institutions included microfinance institutions those lend money to people also face the risk when catastrophe event hit their operation area. Liquidity risk when withdrawal amount and Non Performance Loan (NPL) hiking fast in the same time could hit their cash flow. There are products in market that provide backup fund for this kind of situation. Microfinance institution needs a guideline too make contingency plan in their disaster management program. We develop a probabilistic seismic hazard, index and zonation map as a tool to help in making financial disaster impact reduction program for microfinance in Indonesia. GMPE was used to estimate PGA for each Kabupaten points. PGA to MMI conversion was done by applied empirical relationship. We used loan distribution data from Financial Service Authority and Bank Indonesia as exposure in indexing. Index level from this study could be use as rank of urgency. Probabilistic hazard map was used to pricing two backup scenarios and to make a zonation. We proposed three zones with annual average cost 0.0684‰, 0.4236‰ and 1.4064 for first scenario and 0.3588‰, 2.6112‰, and 6.0816‰ for second scenario.

  5. Defense Depot Tracy Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    PAGES TQM (Total Quality Management ), Depot Operations, Continuous Process Improvement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...make up our pcrceptions of Total Quality Management . Our goal is to improve those proven management processes that have brought us success while being...MANIAGEMENT F. QUALITY AUDITS OF PRODUCTS AND OPERATIONS ASSETS MANAGEMENT 00 i .......... / ~899 29 03 1 EFENSE DEPOT TACY TOTAL QUALITY MANAGEMENT PLAN

  6. Configuration Management Plan for K Basins

    SciT

    Weir, W.R.; Laney, T.

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less

  7. The flight planning - flight management connection

    NASA Technical Reports Server (NTRS)

    Sorensen, J. A.

    1984-01-01

    Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.

  8. Factors affecting household adoption of an evacuation plan in American Samoa after the 2009 earthquake and tsunami.

    PubMed

    Apatu, Emma J I; Gregg, Chris E; Richards, Kasie; Sorensen, Barbara Vogt; Wang, Liang

    2013-08-01

    American Samoa is still recovering from the debilitating consequences of the September 29, 2009 tsunami. Little is known about current household preparedness in American Samoa for future earthquakes and tsunamis. Thus, this study sought to enumerate the number of households with an earthquake and tsunami evacuation plan and to identify predictors of having a household evacuation plan through a post-tsunami survey conducted in July 2011. Members of 300 households were interviewed in twelve villages spread across regions of the principle island of Tutuila. Multiple logistic regression showed that being male, having lived in one's home for < 30 years, and having a friend who suffered damage to his or her home during the 2009 tsunami event increased the likelihood of having a household evacuation plan. The prevalence of tsunami evacuation planning was 35% indicating that survivors might feel that preparation is not necessary given effective adaptive responses during the 2009 event. Results suggest that emergency planners and public health officials should continue with educational outreach to families to spread awareness around the importance of developing plans for future earthquakes and tsunamis to help mitigate human and structural loss from such natural disasters. Additional research is needed to better understand the linkages between pre-event planning and effective evacuation responses as were observed in the 2009 events.

  9. Factors Affecting Household Adoption of an Evacuation Plan in American Samoa after the 2009 Earthquake and Tsunami

    PubMed Central

    Gregg, Chris E; Richards, Kasie; Sorensen, Barbara Vogt; Wang, Liang

    2013-01-01

    American Samoa is still recovering from the debilitating consequences of the September 29, 2009 tsunami. Little is known about current household preparedness in American Samoa for future earthquakes and tsunamis. Thus, this study sought to enumerate the number of households with an earthquake and tsunami evacuation plan and to identify predictors of having a household evacuation plan through a post-tsunami survey conducted in July 2011. Members of 300 households were interviewed in twelve villages spread across regions of the principle island of Tutuila. Multiple logistic regression showed that being male, having lived in one's home for < 30 years, and having a friend who suffered damage to his or her home during the 2009 tsunami event increased the likelihood of having a household evacuation plan. The prevalence of tsunami evacuation planning was 35% indicating that survivors might feel that preparation is not necessary given effective adaptive responses during the 2009 event. Results suggest that emergency planners and public health officials should continue with educational outreach to families to spread awareness around the importance of developing plans for future earthquakes and tsunamis to help mitigate human and structural loss from such natural disasters. Additional research is needed to better understand the linkages between pre-event planning and effective evacuation responses as were observed in the 2009 events. PMID:24349889

  10. Van, Turkey Earthquake of 23 October 2011, Mw 7.2; An Overview on Disaster Management

    PubMed Central

    ZARÉ, Mehdi; NAZMAZAR, Behnaz

    2013-01-01

    An earthquake was happened on 23 October 2011 in Van, Turkey (Mw7.2) at the eastern most area of Anatolian plateau and in the neighborhood of Iranian border (West Azerbaijan Province). The study was performed based on field and office observations and has been focused on the process of disaster management in Turkey after the 23 October 2011 earthquake. We surveyed the quake from the view point of disaster management, and study the relief process during and after the catastrophe. The day-to-day disaster management procedure in seventeen days after the event has been scrutinized as well. The number of victims and extent of damage in Van earthquake was relatively limited according to the national experiences and recent modernization of infrastructures in Turkey. The Van earthquake caused 644 deaths and demolishing of several buildings in the cities of Van and Erciş in Van Province. The performance of the government organizations is however criticized based on their response to the event. PMID:23515082

  11. A comparative study on the Earthquake Information Management Systems (EIMS) in India, Afghanistan and Iran.

    PubMed

    Ajami, Sima

    2012-01-01

    Damages and loss of life sustained during an earthquake results from falling structures and flying glass and objects. To address these and other problems, new information technology and systems as a means can improve crisis management and crisis response. The most important factor for managing the crisis depends on our readiness before disasters by useful data. This study aimed to determine the Earthquake Information Management System (EIMS) in India, Afghanistan and Iran, and describe how we can reduce destruction by EIMS in crisis management. This study was an analytical comparison in which data were collected by questionnaire, observation and checklist. The population was EIMS in selected countries. Sources of information were staff in related organizations, scientific documentations and Internet. For data analysis, Criteria Rating Technique, Delphi Technique and descriptive methods were used. Findings showed that EIMS in India (Disaster Information Management System), Afghanistan (Management Information for Natural Disasters) and Iran are decentralized. The Indian state has organized an expert group to inspect issues about disaster decreasing strategy. In Iran, there was no useful and efficient EIMS to evaluate earthquake information. According to outcomes, it is clear that an information system can only influence decisions if it is relevant, reliable and available for the decision-makers in a timely fashion. Therefore, it is necessary to reform and design a model. The model contains responsible organizations and their functions.

  12. A comparative study on the Earthquake Information Management Systems (EIMS) in India, Afghanistan and Iran

    PubMed Central

    Ajami, Sima

    2012-01-01

    Context: Damages and loss of life sustained during an earthquake results from falling structures and flying glass and objects. To address these and other problems, new information technology and systems as a means can improve crisis management and crisis response. The most important factor for managing the crisis depends on our readiness before disasters by useful data. Aims: This study aimed to determine the Earthquake Information Management System (EIMS) in India, Afghanistan and Iran, and describe how we can reduce destruction by EIMS in crisis management. Materials and Methods: This study was an analytical comparison in which data were collected by questionnaire, observation and checklist. The population was EIMS in selected countries. Sources of information were staff in related organizations, scientific documentations and Internet. For data analysis, Criteria Rating Technique, Delphi Technique and descriptive methods were used. Results: Findings showed that EIMS in India (Disaster Information Management System), Afghanistan (Management Information for Natural Disasters) and Iran are decentralized. The Indian state has organized an expert group to inspect issues about disaster decreasing strategy. In Iran, there was no useful and efficient EIMS to evaluate earthquake information. Conclusions: According to outcomes, it is clear that an information system can only influence decisions if it is relevant, reliable and available for the decision-makers in a timely fashion. Therefore, it is necessary to reform and design a model. The model contains responsible organizations and their functions. PMID:23555130

  13. The impact of earthquakes on the city of Aigio in Greece. Urban planning as a factor in mitigating seismic damage.

    NASA Astrophysics Data System (ADS)

    Athanasopoulou, Evanthia; Despoiniadou, Varvara; Dritsos, Stefanos

    2008-07-01

    This paper examines the effects of the mortal earthquake on the city of Aigio in Greece in 1995, with particular focus on urbanization and planning policies. It is based on interviews with experts and surveys on damage to buildings following this earthquake. The analysis takes into account several factors, such as exact location, land use, construction period and the height of damaged buildings. Furthermore, the relationship between the seismic damage and the postseismic construction development of Aigio is examined and the conclusion is reached that the Greek urban planning system needs to be better organized to prepare for seismic damage. To this end, the paper recommends a five-point discussion agenda for applying local planning to seismic mitigation.

  14. Kentucky's highway incident management strategic plan.

    DOT National Transportation Integrated Search

    2005-06-01

    Kentucky s Highway Incident Management Strategic Plan consists of a mission statement, 4 goals, 16 objectives, and 49 action strategies. The action strategies are arranged by priority and recommended time frame for implementation. When implemented...

  15. Introduction to Soil Fumigant Management Plans

    EPA Pesticide Factsheets

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  16. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    SciT

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  17. Traffic Management Plan Effectiveness Study, Final Report

    DOT National Transportation Integrated Search

    1993-05-28

    MULTI-DIMENSIONAL TRAFFIC MANAGEMENT PLANS (TMPS) HAVE BECOME INCREASINGLY ACCEPTED BY TRANSPORTATION PROFESSIONALS, STATE AND LOCAL GOVERNMENTS AND THE PUBLIC AS A VIABLE MEANS OF MAINTANING ACCEPTABLE LEVELS OF TRAFFIC FLOW DURING PERIODS OF TRAFFI...

  18. Checklist for Reviewing EPA Quality Management Plans

    EPA Pesticide Factsheets

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  19. New Management Finance Plan for Alberta.

    ERIC Educational Resources Information Center

    Congdon, R. E.

    1984-01-01

    The Alberta Management and Finance Plan (MFP) for the administration of, distribution of, and reporting on educational funding will be implemented in stages during the next three years. A process chart illustrates the MFP. (MLF)

  20. MDOT Materials Laboratories : Environmental Management Plan

    DOT National Transportation Integrated Search

    2012-06-01

    The goal of this EMP was to develop and implement a comprehensive Environmental : Management Plan for MDOT Materials Laboratories. This goal was achieved through : perfonnance of environmental audits to identify potential environmental impacts, and b...

  1. New Jersey interagency emergency management plan.

    DOT National Transportation Integrated Search

    2005-09-01

    This report outlines the research and work performed to lay the foundation for the : development of a New Jersey Interagency Emergency Management Plan. The : research into existing practices within the four state level transportation agencies : revea...

  2. Sample transportation management plans and templates.

    DOT National Transportation Integrated Search

    2010-08-01

    This Guide consisting of samples, templates, and tips is designed to help transportation agencies with the : development and implementation of their own Transportation Management Plans (TMPs). Understanding : the work zone impacts is critical to deve...

  3. Special event planning for the emergency manager.

    PubMed

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.

  4. Do You Have a Crisis Management Plan?

    ERIC Educational Resources Information Center

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  5. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  6. Management of gas gangrene in Wenchuan earthquake victims.

    PubMed

    Chen, Enqiang; Deng, Linyu; Liu, Zigui; Zhu, Xia; Chen, Xuebing; Tang, Hong

    2011-02-01

    Gas gangrene is an emergency condition, which usually develops after injuries or surgery. This study was designed to investigate clinical characteristics, appropriate therapy, and effective control of nosocomial cross-infection of gas gangrene in Wenchuan earthquake victims. Data on diagnosis, treatment, and prevention of confirmed, suspected, or highly suspected gas gangrene were collected. Sixty-seven (2.41%) cases of suspected gas gangrene were found, in which 32 cases were highly suspected of gas gangrene and 5 cases were confirmed by culture of Clostridium perfringens. Thereof, injury sites were mainly located on the limbs, and typical indications, including crepitation, severe localized pain, swelling, wound discoloration, dark red or black necrotic muscle, foul smell as well as different degrees of systemic toxic performance were common among them. After hospitalization, all patients were isolated and had surgery quickly to remove dead, damaged or infected tissue. The wounds were also exposed for drainage and washed or padded with 3% liquid hydrogen peroxide for disinfection before all diagnostic test results were available. Additionally, high doses of antibiotics (mainly penicillin) were given for the prevention of infection, and supportive therapy was applied for corresponding symptoms control. Among those cases, no fatality was reported. In summary, in post-disaster emergency relief, the diagnosis of gas gangrene should be primarily based on clinical manifestations; while patient isolation, wound debridement and disinfection, as well as antibiotics treatment, is the main measures for proper treatment and control of nosocomial infection for gas gangrene.

  7. The impact of a major earthquake on the evacuation of the emergency planning zone of a nuclear power plant.

    PubMed

    Cohen, Rebecca; Weinisch, Kevin

    2015-01-01

    United States regulations require nuclear power plants (NPPs) to estimate the time needed to evacuate the emergency planning zone (EPZ, a circle with an approximate 10-mile radius centered at the NPP). These evacuation time estimate (ETE) studies are to be used by emergency personnel in the event of a radiological emergency. ETE studies are typically done using traffic simulation and evacuation models, based on traffic engineering algorithms that reflect congestion and delay. ETE studies are typically conducted assuming all evacuation routes are traversable. As witnessed in the Great East Japan Earthquake in March 2011, an earthquake and the ensuing tsunami can cause an incident at a NPP that requires an evacuation of the public. The earthquake and tsunami can also damage many of the available bridges and roadways and, therefore, impede evacuation and put people at risk of radiation exposure. This article presents a procedure, using traffic simulation and evacuation models, to estimate the impact on ETE due to bridge and roadway damage caused by a major earthquake, or similar hazardous event. The results of this analysis are used by emergency personnel to make protective action decisions that will minimize the exposure of radiation to the public. Additionally, the results allow emergency planners to ensure proper equipment and personnel are available for these types of events. Emergency plans are revised to ensure prompt response and recovery action during critical times.

  8. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  9. Strategic Planning for Information Resources Management.

    ERIC Educational Resources Information Center

    Penrod, James; Dolence, Michael

    1987-01-01

    In 1985, California State University/Los Angeles changed the management of its information resources by hiring a vice president for information resources management; reorganizing existing units into an IRM organization; engaging in a detailed, integrated, participative strategic planning process; and initiating several significant projects.…

  10. A CLEAR Plan for School Crisis Management.

    ERIC Educational Resources Information Center

    Moriarty, Anthony; And Others

    1993-01-01

    Although many school formulas for crisis management are well coordinated internally, many are also shortsighted in recognizing when a school crisis falls simultaneously into law enforcement's domain. An Illinois high school has devised CLEAR, a crisis management plan delineating cognizance of personnel, the linkages they establish, accountability…

  11. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  12. Management and Planning for Small Community Wastewater

    Operators Small Systems Management and Planning for Small Community Wastewater The NESC has provided information below. If you have a technical question we can help. Call us toll free at (304) 293-4191. or e of Clean Water Agencies (NACWA) Achieving Environmental Excellence: An Environmental Management

  13. Planning, Designing and Managing Higher Education Institutions

    ERIC Educational Resources Information Center

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  14. Strategic Management or Strategic Planning for Defense?

    DTIC Science & Technology

    1989-02-01

    manage at the regional or CinC level with an appreciation of strategic planning and management concepts currently taught at business schools . Military...those not in uniform. Science, engineering, and business schools all suggest that their faculties have experience tours so that they can appreciate

  15. Myopia management: multihospital portfolio planning.

    PubMed

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  16. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  17. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  18. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  19. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  20. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  1. Total Quality Management Master Plan

    DTIC Science & Technology

    1989-01-01

    Enhanced competitiveness in the private . public and international sectors - Increased cash flow, influenced by contractor’s contributions to quality I...the project applies novel public- sector compensation concepts gleaned from the best in the private sector . Major employee development opportunities...management must strive to upgrade the quality of worklife which will also contribute to an environment which fosters continuous improvement. Individuals

  2. Strategic Management Plan. FY11

    DTIC Science & Technology

    2010-12-30

    process flows . Many of the improvements sought in this SMP require us to think about our business operations from an end-to-end perspective because the...underlying processes cut across many of our traditional organizations and functional business areas. The 15 end-to-end process flows that were...Redeployment/ Retrograde • Environmental Liabilities • Hire-to-Retire (H2R) • Market-to-Prospect (M2P) • Order-to- Cash (O2C) • Plan-to-Stock

  3. Vulnerability of port and harbor communities to earthquake and tsunami hazards: The use of GIS in community hazard planning

    Wood, Nathan J.; Good, James W.

    2004-01-01

    AbstractEarthquakes and tsunamis pose significant threats to Pacific Northwest coastal port and harbor communities. Developing holistic mitigation and preparedness strategies to reduce the potential for loss of life and property damage requires community-wide vulnerability assessments that transcend traditional site-specific analyses. The ability of a geographic information system (GIS) to integrate natural, socioeconomic, and hazards information makes it an ideal assessment tool to support community hazard planning efforts. This article summarizes how GIS was used to assess the vulnerability of an Oregon port and harbor community to earthquake and tsunami hazards, as part of a larger risk-reduction planning initiative. The primary purposes of the GIS were to highlight community vulnerability issues and to identify areas that both are susceptible to hazards and contain valued port and harbor community resources. Results of the GIS analyses can help decision makers with limited mitigation resources set priorities for increasing community resiliency to natural hazards.

  4. Emergency mapping and information management during Nepal Earthquake 2015 - Challenges and lesson learned

    NASA Astrophysics Data System (ADS)

    Joshi, G.; Gurung, D. R.

    2016-12-01

    A powerful 7.8 magnitude earthquake struck Nepal at 06:11 UTC on 25 April 2015. Several subsequent aftershocks were deadliest earthquake in recent history of Nepal. In total about 9000 people died and 22,300 people were injured, and lives of eight million people, almost one-third of the population of Nepal was effected. The event lead to massive campaigned to gather data and information on damage and loss using remote sensing, field inspection, and community survey. Information on distribution of relief materials is other important domain of information necessary for equitable relief distribution. Pre and post-earthquake high resolution satellite images helped in damage area assessment and mapping. Many national and international agencies became active to generate and fill the information vacuum. The challenges included data access bottleneck due to lack of good IT infrastructure; inconsistent products due to absence of standard mapping guidelines; dissemination challenges due to absence of Standard Operating Protocols and single information gateway. These challenges were negating opportunities offered by improved earth observation data availability, increasing engagement of volunteers for emergency mapping, and centralized emergency coordination practice. This paper highlights critical practical challenges encountered during emergency mapping and information management during the earthquake in Nepal. There is greater need to address such challenges to effectively use technological leverages that recent advancement in space science, IT and mapping domain provides.

  5. Hanford cultural resources management plan

    SciT

    Chatters, J.C.

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended formore » multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.« less

  6. Total Quality Management Implementation Plan for Military Personnel Management

    DTIC Science & Technology

    1989-09-01

    2050.. )ATE 3. REPORT TYPE AND DATES CO VERED 4. TITLE AND SUBTITLE 5,rrmir18 . FUNDING NUMBERS Total Quality Management Implementation Plan for...SUBJECT TERMS 15. NUMBER OF PAGES TQM (Total Quality Management ), Military Personnel Management, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...UNCLASSIFIED UNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std Z39-16 296-102 TOTAL QUALITY MANAGEMENT I

  7. Data Management Facility Operations Plan

    SciT

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  8. Real health plans manage care.

    PubMed

    Hurley, Robert

    2006-01-01

    The public sector might seem to be an appealing growth opportunity to commercial insurers confronted by stalled private-sector coverage expansion, but whether these insurers have the means and motivation to deliver value to Medicare and Medicaid is unproven. State Medicaid purchasers in particular have found alternative sources for care management and have sound reasons to question whether industry-leading commercial insurers will be responsive to their needs.

  9. IMPLEMENTATION OF INFORMATION SHARING DEMONSTRATION AMONG ORGANIZATIONS IN CHARGE OF DISASTER MANAGEMENT IN TOKYO METROPOLITAN NEAR FIELD EARTHQUAKE DISASTER

    NASA Astrophysics Data System (ADS)

    Hada, Yasunori; Kondo, Shinya; Meguro, Kimiro; Ohara, Miho; Zama, Shinsaku; Endo, Makoto; Kobayashi, Keiji; Suzuki, Takeyasu; Noda, Itsuki; Shimora, Hiroki; Takeuchi, Ikuo; Kobayashi, Satoshi; Arakawa, Junpei; Yoshimoto, Kenichi

    For realizing cross-sectional inform ation sharing in the Tokyo metropolitan area, we develop disaster management applications to reduce negative impact due to vital issue in phase of initial response, and cooperation of those applications are demonstrated toward public officials in charge of disaster management. The demonstration of information sharing among disaster related organizations focusing on issues about simultaneous multiple post-earthquake fires and rescue operations after an earthquake directly underneath Tokyo are reported.

  10. Natural disaster management: experience of an academic institution after a 7.8 magnitude earthquake in Ecuador.

    PubMed

    Cordero-Reyes, A M; Palacios, I; Ramia, D; West, R; Valencia, M; Ramia, N; Egas, D; Rodas, P; Bahamonde, M; Grunauer, M

    2017-03-01

    This case study describes the implementation of an academic institution's disaster management plan. Case study. USFQ's Medical School developed a six-phase disaster relief plan consisting of: induction, establishing a base camp, crisis management and mental health aid, creation of multidisciplinary teams and multi-agency teams, and reconstruction. Each phase uses a community-oriented approach to foster survivor autonomy and recovery. Our methodology facilitated the successful implementation of multidisciplinary interventions to manage the earthquake's aftermath on the personal, community and regional levels, treated and prevented psychological and physical morbidity among survivors and promoted healthy living conditions and independence. A multidisciplinary response team that addresses medical needs, mental health, education, food, nutrition and sanitation is highly effective in contributing to timely, effective relief efforts. The short- and long-term solutions we describe could be applicable to other academic centres' interventions in future disaster scenarios around the world. Copyright © 2016 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  11. Historical earthquakes studies in Eastern Siberia: State-of-the-art and plans for future

    NASA Astrophysics Data System (ADS)

    Radziminovich, Ya. B.; Shchetnikov, A. A.

    2013-01-01

    Many problems in investigating historical seismicity of East Siberia remain unsolved. A list of these problems may refer particularly to the quality and reliability of data sources, completeness of parametric earthquake catalogues, and precision and transparency of estimates for the main parameters of historical earthquakes. The main purpose of this paper is to highlight the current status of the studies of historical seismicity in Eastern Siberia, as well as analysis of existing macroseismic and parametric earthquake catalogues. We also made an attempt to identify the main shortcomings of existing catalogues and to clarify the reasons for their appearance in the light of the history of seismic observations in Eastern Siberia. Contentious issues in the catalogues of earthquakes are considered by the example of three strong historical earthquakes, important for assessing seismic hazard in the region. In particular, it was found that due to technical error the parameters of large M = 7.7 earthquakes of 1742 were transferred from the regional catalogue to the worldwide database with incorrect epicenter coordinates. The way some stereotypes concerning active tectonics influences on the localization of the epicenter is shown by the example of a strong М = 6.4 earthquake of 1814. Effect of insufficient use of the primary data source on completeness of earthquake catalogues is illustrated by the example of a strong M = 7.0 event of 1859. Analysis of the state-of-the-art of historical earthquakes studies in Eastern Siberia allows us to propose the following activities in the near future: (1) database compilation including initial descriptions of macroseismic effects with reference to their place and time of occurrence; (2) parameterization of the maximum possible (magnitude-unlimited) number of historical earthquakes on the basis of all the data available; (3) compilation of an improved version of the parametric historical earthquake catalogue for East Siberia with

  12. Surgical Management of Musculoskeletal Injuries after 2015 Nepal Earthquake: Our Experience

    PubMed Central

    Vaishya, Raju; Vijay, Vipul; Hussaini, Mustafa; Singh, Harsh

    2015-01-01

    We report our experience of handling 80 major musculoskeletal injuries in a brief span of three days immediately after the major earthquake of Nepal in April 2015. Planning, proper utilization of resources, and prioritizing the patients for surgical intervention is highlighted. The value of damage control by orthopaedics in these disasters is discussed. Timely and appropriate surgical treatment by a skilled orthopaedic team not only can save these injured limbs but also the lives of the victims of a major disaster. PMID:26430580

  13. Management and operating contractors' pension plans

    SciT

    None

    1987-06-01

    This report concerns the management of 28 M and O contractor pension plans with assets exceeding $2.6 billion in 1983. At the end of 1983, these pension plans were overfunded by $600 million. The Department could have saved $94 million in 1983 had the contractors been required to limit their pension plan contributions to the Government-established minimum level. Since 1979, the Department has continually reimbursed these contractors for contributions to pension plans that were already overfunded and we estimate that these plans are currently overfunded in excess of $1 billion. Additional annual savings of about $548,000 could be realized ifmore » the Department obtained waivers for M and O contractors participating in the Pension Benefit Guaranty Corporation's (PBGC) insurance program. Management and Administration, which has overall responsibility for controlling such costs, indicated it did not agree that contractors should fund pension plans at only the minimum required level. General agreement was indicated with the need to obtain waivers from PBGC premiums and better protect the Department's interest in contractor excess pension assets.« less

  14. Management Matters: Planning Goals and Time

    ERIC Educational Resources Information Center

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  15. Strategic Planning for Management Information Systems.

    ERIC Educational Resources Information Center

    Ein-Dor, Phillip; Segev, Eli

    1978-01-01

    Two factors predominate in determining the appropriateness of strategic plans for management information systems (MIS)--explicitness (the degree to which the process is conscious, formal, and documented) and situational fit (the degree to which the MIS is compatible with the specific organization and its members). (Author/IRT)

  16. Analytical aids in land management planning

    David R. Betters

    1978-01-01

    Quantitative techniques may be applied to aid in completing various phases of land management planning. Analytical procedures which have been used include a procedure for public involvement, PUBLIC; a matrix information generator, MAGE5; an allocation procedure, linear programming (LP); and an input-output economic analysis (EA). These techniques have proven useful in...

  17. Crisis management and recovery from the damage to the laboratory animal production facility due to the Great East Japan Earthquake.

    PubMed

    Ikeda, Takuya

    2012-01-01

    Charles River Laboratories Japan produces laboratory animals, mainly mice and rats. In its history, we have experienced many crises such as mass food poisoning of staff and contamination of animals. However, we overcame these crises, accomplishing our corporate missions to secure steady supply of healthy animals. Under such circumstances, in 2008, we faced an unprecedented crisis involving a novel influenza possibly becoming pandemic. Therefore, we prepared a Crisis Management Plan (CMP) and Business Continuity Plan (BCP) to avoid the worst case scenario. Fortunately, the novel influenza did not develop into a pandemic and no major problems occurred in production of our laboratory animals. In March 2011, our Tsukuba Breeding Center was struck by the Great East Japan Earthquake. Many cages fell from racks, and consequently, 14,000 mice and rats were euthanized. Moreover, this animal production facility experienced not only blackouts and water outage but also various maintenance problems. After triage of the animals, almost half of the animals kept were eventually lost. However, we recovered and resumed shipment of animals two weeks after the disaster by utilizing the CMP and BCP we initially created as a countermeasure against novel influenza. After two months, our production volume returned to normal except for two strains. I sincerely hope this review, which highlights our experience and related issues, will be a useful resource in regard to crisis management for people who are engaged in laboratory animal care and use.

  18. An accountable fistula management treatment plan.

    PubMed

    Thompson, Mary Jo; Epanomeritakis, Emanuel

    An accountable fistula management treatment plan focuses on combining effective medical and nursing treatment with effective and efficient pouching technique and equipment to ensure patient comfort. Small bowel fistula following abdominal surgery can provide challenges in patients' medical and nursing management. This article describes a case study of the successful medical and nursing management of a patient post-abdominal surgery. Within days of surgery a small bowel fistula formed within an abdominal wound. Medical management involved the use of total parenteral nutrition, electrolyte balance management, nil orally and Sandostatin medication. The nursing interventions comprised accurate intake and output measurement, effective and efficient pouching systems and appropriate psychological care. The medical and nursing interventions provided during the healing process are outlined together with the assessment and evaluation of a new innovative wound management pouch. This system proved invaluable in the successful containment of a high small bowel effluent and skin preservation. In an attempt to share best practice a pictorial guide is provided to demonstrate the correct application of the pouching system and technique. This article provides details of an accountable fistula management treatment plan which resulted in the successful spontaneous closure of the small bowel fistula coupled with excellent cost-effectiveness and patient comfort.

  19. NIF Operations Management Plan, August 2011

    SciT

    Van Wonterghem, Bruno M.

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to

  20. Nevada Test Site Resource Management Plan

    SciT

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of themore » RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.« less

  1. Legal analysis of citizen lawsuit toward management of the 2006 Yogyakarta earthquake

    NASA Astrophysics Data System (ADS)

    Suprihadi, Bambang

    2017-07-01

    The Asian Disaster Reduction Center informed that on 27 May 2006 at 5:54 AM Local time or 26 May 2006 at 10:54:00 PM UTC, an M6.3 earthquake has struck the very highly populated region of Yogyakarta. The death estimated between 5,775 and 6,234 and the number of injured was between 46,000 and 53,000. Invitation letters were sent to Indonesia Agency for Meteorology Climatology and Geophysics (BMKG) and to 18 government institutions for attending the session at the Yogyakarta Court on 4 December 2006. Such case was a lawsuit proposed by 46 citizens and registered as number 73/PDT.G/ 2006/PN-Yk and the researcher attended court-session on behalf of the BMKG. Research is conducted to provide legal analysis of citizen lawsuit toward management of the 2006 Yogyakarta earthquake. Data was collected by examining the process of court sessions and mediation between Parties involved which then analysed using the relevant articles of Indonesian Civil Procedural Law. Legal analysis proposed by the researcher indicates that State Court (Pengadilan Negeri) held an `absolute competence' because such case shall not be settled by State Administrative Court (Pengadilan Tata Usaha Negara), however Yogyakarta District Court didn't hold a `relative competence' because such case shall be settled by the Central Jakarta District Court. Such case was not continued due to successful mediation between the two Parties. The 2006 Yogyakarta earthquake alerts BMKG as the earthquake information provider to work properly in accordance with the standard operating procedure to avoid citizen lawsuit that might be proposed in the near future.

  2. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...: (a) Consult with the Navajo Nation in planning conservation practices, including grazing control and range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans with...

  3. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... interdisciplinary approach shall be used in the preparation, amendment and revision of resource management plans as... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING... and amendment of resource management plans may be provided by the Director and State Director, as...

  4. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... when they are needed to address water quality problems. (1) Total maximum daily loads. TMDLs in...

  5. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  6. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  7. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  8. Major Earthquakes of the Past Decade (2000-2010): A Comparative Review of Various Aspects of Management

    PubMed Central

    Kalantar Motamedi, Mohammad Hosein; Sagafinia, Masoud; Ebrahimi, Ali; Shams, Ehsan; Kalantar Motamedi, Mostafa

    2012-01-01

    Objectives: This article sought to review and compare data of major earthquakes of the past decade and their aftermath in order to compare the magnitude, death toll, type of injuries, management procedures, extent of destruction and effectiveness of relief efforts. Materials and Methods: A retrospective study of the various aspects of management and aftermath of 5 major earthquakes of the past decade (2000–2010) was undertaken. This included earthquakes occurring in Bam Iran, Sichuan China, Port-au-Prince Haiti, Kashmir Pakistan and Ica Peru. A literature search was done via computer of published articles (indexed in Pubmed). The issues assessed included: 1)Local magnitude,2)Type of building structure 3)Time of the earthquake (day/time/season), 4)Time to rescue, 5)Triage, Transfer, and Treatment 6) Distribution of casualties (dead/ injured), 7)Degree of city damage, 8)Degree of damage to health facilities, 9)Field hospital availability, 10)International aid, 11)Air transfer, 12) Telecommunication systems availability, 13) PTSD prevalence, 14) Most common injury and 15) Most common disease outbreak. Results: The Bam earthquake had the lowest (6.6 Richter’s) and the Sichuan earthquake had the greatest magnitude (8.0 Richter’s). Mortality in Haiti was 212,000 and it was the deadliest earthquake of the past decade. Collapse of heavy clay roofing structures was a major cause of death in Iran and Pakistan. Earthquakes occurring at night and nonworking days carried a high death toll. The time to rescue and treat was the lengthiest in Haiti (possibly contributing to the death to injured ratio). However, the worst dead to injured ratios were in Bam (51%) and in Pakistan (47%); the best ratio was in China (15%). Iran and Pakistan suffered the highest percentage of damage to the health facilities (90%). Field hospital availability, international aid and air transfer were important issues. Telecommunication systems were best in China and worst in Pakistan. PTSD

  9. Major earthquakes of the past decade (2000-2010): a comparative review of various aspects of management.

    PubMed

    Kalantar Motamedi, Mohammad Hosein; Sagafinia, Masoud; Ebrahimi, Ali; Shams, Ehsan; Kalantar Motamedi, Mostafa

    2012-01-01

    This article sought to review and compare data of major earthquakes of the past decade and their aftermath in order to compare the magnitude, death toll, type of injuries, management procedures, extent of destruction and effectiveness of relief efforts. A retrospective study of the various aspects of management and aftermath of 5 major earthquakes of the past decade (2000-2010) was undertaken. This included earthquakes occurring in Bam Iran, Sichuan China, Port-au-Prince Haiti, Kashmir Pakistan and Ica Peru. A literature search was done via computer of published articles (indexed in Pubmed). The issues assessed included: 1)Local magnitude,2)Type of building structure 3)Time of the earthquake (day/time/season), 4)Time to rescue, 5)Triage, Transfer, and Treatment 6) Distribution of casualties (dead/ injured), 7)Degree of city damage, 8)Degree of damage to health facilities, 9)Field hospital availability, 10)International aid, 11)Air transfer, 12) Telecommunication systems availability, 13) PTSD prevalence, 14) Most common injury and 15) Most common disease outbreak. The Bam earthquake had the lowest (6.6 Richter's) and the Sichuan earthquake had the greatest magnitude (8.0 Richter's). Mortality in Haiti was 212,000 and it was the deadliest earthquake of the past decade. Collapse of heavy clay roofing structures was a major cause of death in Iran and Pakistan. Earthquakes occurring at night and nonworking days carried a high death toll. The time to rescue and treat was the lengthiest in Haiti (possibly contributing to the death to injured ratio). However, the worst dead to injured ratios were in Bam (51%) and in Pakistan (47%); the best ratio was in China (15%). Iran and Pakistan suffered the highest percentage of damage to the health facilities (90%). Field hospital availability, international aid and air transfer were important issues. Telecommunication systems were best in China and worst in Pakistan. PTSD prevalence was highest in Iran. Respiratory infection was

  10. Solid waste management complex site development plan

    SciT

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less

  11. Strategic plan for Hanford site information management

    SciT

    NONE

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandatesmore » of DOE.« less

  12. Development of Earthquake Emergency Response Plan for Tribhuvan International Airport, Kathmandu, Nepal

    DTIC Science & Technology

    2013-02-01

    Kathmandu, Nepal 5a. CONTRACT NUMBER W911NF-12-1-0282 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER ...In the past, big earthquakes in Nepal (see Figure 1.1) have caused a huge number of casualties and damage to structures. The Great Nepal -Bihar...UBC Earthquake Engineering Research Facility 2235 East Mall, Vancouver, BC, Canada V6T 1Z4 Phone : 604 822-6203 Fax: 604 822-6901 E-mail

  13. Cultural Resources Management Plan: Coralville Lake, Iowa.

    DTIC Science & Technology

    1987-05-01

    7 iAlf now* E-* ILA’AUKEE -.WlSCCqSIN -. THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA - FINAL CULTURAL RESOURCES MANAGEMENT PLAN Prepared By...2004 In Fulfillment of: Contract No. DACW25-86-C-0036 May 1987 (A -P. 7V. V T This report entitled, "The Archaeology of Coralville Lake, Iowa - Final...various studies include survey, testing, and geomorphic investigations. "The Archaeology of Coralville Lake, Iowa - Landscape Evolution" presents the

  14. Data management plans: the missing perspective.

    PubMed

    Williams, Mary; Bagwell, Jacqueline; Nahm Zozus, Meredith

    2017-07-01

    The National Institutes of Health requires data sharing plans for projects with over five hundred thousand dollars in direct costs in a single year and has recently released a new guidance on rigor and reproducibility in grant applications. The National Science Foundation outright requires Data Management Plans (DMPs) as part of applications for funding. However, there is no general and definitive list of topics that should be covered in a DMP for a research project. We identified and reviewed DMP requirements from research funders. Forty-three DMP topics were identified. The review uncovered inconsistent requirements for written DMPs as well as high variability in required or suggested DMP topics among funder requirements. DMP requirements were found to emphasize post-publication data sharing rather than upstream activities that impact data quality, provide traceability or support reproducibility. With the emphasis equalized, the forty-three identified topics can aid Data Managers in systematically generating comprehensive DMPs that support research project planning and funding application evaluation as well as data management conduct and post-publication data sharing. Copyright © 2017. Published by Elsevier Inc.

  15. Resources planning for radiological incidents management

    NASA Astrophysics Data System (ADS)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  16. Management strategies in hospitals: scenario planning.

    PubMed

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  17. Management strategies in hospitals: scenario planning

    PubMed Central

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management. PMID:26504735

  18. Role of strategic planning in engineering management

    NASA Technical Reports Server (NTRS)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  19. Medical technology management: from planning to application.

    PubMed

    David, Y; Jahnke, E

    2005-01-01

    Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations.

  20. Guide to Developing an Environmental Management System - Plan

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  1. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  2. NYC CV Pilot Deployment : Safety Management Plan : New York City.

    DOT National Transportation Integrated Search

    2016-04-22

    This safety management plan identifies preliminary safety hazards associated with the New York City Connected Vehicle Pilot Deployment project. Each of the hazards is rated, and a plan for managing the risks through detailed design and deployment is ...

  3. Quality Management Plan for the Environmental Assessment and Innovation Division

    EPA Pesticide Factsheets

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  4. [Response of primary care teams to manage mental health problems after the 2010 earthquake].

    PubMed

    Vitriol, Verónica; Minoletti, Alberto; Alvarado, Rubén; Sierralta, Paula; Cancino, Alfredo

    2014-09-01

    Thirty to 50% of people exposed to a natural disaster suffer psychological problems in the ensuing months. To characterize the activities in mental health developed by Primary Health Care centers after the earthquake that affected Chile on february 27th, 2010. A cross-sectional study analyzing 16 urban centers of Maule Region, was carried out. A questionnaire was developed to know the preparatory and supportive activities directed to the community and the training and self-care activities directed to Health Care personnel that were made during the 12 months following the catastrophe. In addition, a questionnaire evaluating structural aspects was designed. Only 1/3 of the centers made some preparatory activity and none of them made a diagnosis of population vulnerability. The average of protective Mental Health interventions coverage reached 35% of the population estimated to be most affected. The activities lasted 31 to 62% of the optimal duration standards set by experts (according to the type of action). Important differences between centers in economic and geographical accessibility, construction and professional resources were found. This study shows the difficulties faced by urban centers of Maule Region to deal with mental health problems caused by the earthquake, which were attributable to the absence of local planning and drills, and to the lack of intra and inter sectorial coordination.

  5. Terrestrial forest management plan for Palmyra Atoll

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  6. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  7. 25 CFR 700.721 - Range management plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Range management plans. 700.721 Section 700.721 Indians... Lands Grazing § 700.721 Range management plans. The Commissioner (or his designee) and the permittees of each range unit will meet as a group and develop a Range Management Plan for the common use of the...

  8. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  9. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  10. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  11. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  12. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  13. 76 FR 53149 - North American Waterfowl Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...

  14. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  15. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  16. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  17. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  18. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  19. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    SciT

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements andmore » challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total

  20. Strategic and tactiocal planning for managing national park resources

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  1. 2016 National Earthquake Conference

    Thank you to our Presenting Sponsor, California Earthquake Authority. What's New? What's Next ? What's Your Role in Building a National Strategy? The National Earthquake Conference (NEC) is a , state government leaders, social science practitioners, U.S. State and Territorial Earthquake Managers

  2. Risk Management in Earthquakes, Financial Markets, and the Game of 21: The role of Forecasting, Nowcasting, and Timecasting

    NASA Astrophysics Data System (ADS)

    Rundle, J. B.

    2017-12-01

    Earthquakes and financial markets share surprising similarities [1]. For example, the well-known VIX index, which by definition is the implied volatility of the Standard and Poors 500 index, behaves in very similar quantitative fashion to time series for earthquake rates. Both display sudden increases at the time of an earthquake or an announcement of the US Federal Reserve Open Market Committee [2], and both decay as an inverse power of time. Both can be regarded as examples of first order phase transitions [1], and display fractal and scaling behavior associated with critical transitions, such as power-law magnitude-frequency relations in the tails of the distributions. Early quantitative investors such as Edward Thorpe and John Kelly invented novel methods to mitigate or manage risk in games of chance such as blackjack, and in markets using hedging techniques that are still in widespread use today. The basic idea is the concept of proportional betting, where the gambler/investor bets a fraction of the bankroll whose size is determined by the "edge" or inside knowledge of the real (and changing) odds. For earthquake systems, the "edge" over nature can only exist in the form of a forecast (probability of a future earthquake); a nowcast (knowledge of the current state of an earthquake fault system); or a timecast (statistical estimate of the waiting time until the next major earthquake). In our terminology, a forecast is a model, while the nowcast and timecast are analysis methods using observed data only (no model). We also focus on defined geographic areas rather than on faults, thereby eliminating the need to consider specific fault data or fault interactions. Data used are online earthquake catalogs, generally since 1980. Forecasts are based on the Weibull (1952) probability law, and only a handful of parameters are needed. These methods allow the development of real time hazard and risk estimation using cloud-based technologies, and permit the application of

  3. 14 CFR 136.39 - Air tour management plans (ATMP).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Air tour management plans (ATMP). 136.39... TOURS AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.39 Air tour management plans (ATMP). (a) Establishment. The Administrator, in cooperation with the Director, shall...

  4. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation of integrated resource management plans which provide coordination for the comprehensive management of all natural resources on Indian land. If the integrated resource management planning process... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management...

  5. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... 25 Indians 1 2011-04-01 2011-04-01 false Forest management planning and sustained yield management... management planning for Indian forest land shall be carried out through participation in the development and...

  6. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... of this program is to promote the integrated management and operations of the transportation system... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Integrated Corridor Management... the Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to...

  7. Seismic Awareness : Transportation Facilities : A Primer for Transportation Managers on Earthquake Hazards and Measures for Reducing Vulnerability

    DOT National Transportation Integrated Search

    1993-12-01

    The purpose of this report is to alert managers and operators of transportation enterprises, in both the public and private sector, to the dangers of earthquakes to buildings and possible precautions to be taken. The nature of seismic hazards in the ...

  8. Study of Earthquake Disaster Prediction System of Langfang city Based on GIS

    NASA Astrophysics Data System (ADS)

    Huang, Meng; Zhang, Dian; Li, Pan; Zhang, YunHui; Zhang, RuoFei

    2017-07-01

    In this paper, according to the status of China’s need to improve the ability of earthquake disaster prevention, this paper puts forward the implementation plan of earthquake disaster prediction system of Langfang city based on GIS. Based on the GIS spatial database, coordinate transformation technology, GIS spatial analysis technology and PHP development technology, the seismic damage factor algorithm is used to predict the damage of the city under different intensity earthquake disaster conditions. The earthquake disaster prediction system of Langfang city is based on the B / S system architecture. Degree and spatial distribution and two-dimensional visualization display, comprehensive query analysis and efficient auxiliary decision-making function to determine the weak earthquake in the city and rapid warning. The system has realized the transformation of the city’s earthquake disaster reduction work from static planning to dynamic management, and improved the city’s earthquake and disaster prevention capability.

  9. Earthquake forecasting during the complex Amatrice-Norcia seismic sequence.

    PubMed

    Marzocchi, Warner; Taroni, Matteo; Falcone, Giuseppe

    2017-09-01

    Earthquake forecasting is the ultimate challenge for seismologists, because it condenses the scientific knowledge about the earthquake occurrence process, and it is an essential component of any sound risk mitigation planning. It is commonly assumed that, in the short term, trustworthy earthquake forecasts are possible only for typical aftershock sequences, where the largest shock is followed by many smaller earthquakes that decay with time according to the Omori power law. We show that the current Italian operational earthquake forecasting system issued statistically reliable and skillful space-time-magnitude forecasts of the largest earthquakes during the complex 2016-2017 Amatrice-Norcia sequence, which is characterized by several bursts of seismicity and a significant deviation from the Omori law. This capability to deliver statistically reliable forecasts is an essential component of any program to assist public decision-makers and citizens in the challenging risk management of complex seismic sequences.

  10. Earthquake forecasting during the complex Amatrice-Norcia seismic sequence

    PubMed Central

    Marzocchi, Warner; Taroni, Matteo; Falcone, Giuseppe

    2017-01-01

    Earthquake forecasting is the ultimate challenge for seismologists, because it condenses the scientific knowledge about the earthquake occurrence process, and it is an essential component of any sound risk mitigation planning. It is commonly assumed that, in the short term, trustworthy earthquake forecasts are possible only for typical aftershock sequences, where the largest shock is followed by many smaller earthquakes that decay with time according to the Omori power law. We show that the current Italian operational earthquake forecasting system issued statistically reliable and skillful space-time-magnitude forecasts of the largest earthquakes during the complex 2016–2017 Amatrice-Norcia sequence, which is characterized by several bursts of seismicity and a significant deviation from the Omori law. This capability to deliver statistically reliable forecasts is an essential component of any program to assist public decision-makers and citizens in the challenging risk management of complex seismic sequences. PMID:28924610

  11. Principles of effective USA federal fire management plans

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  12. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste management plan shall identify both the feasibility and the approach to separate certain components of solid waste from the health care waste stream in order to reduce the amount of toxic emissions from...

  13. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste management plan shall identify both the feasibility and the approach to separate certain components of solid waste from the health care waste stream in order to reduce the amount of toxic emissions from...

  14. Energy Management Lesson Plans for Vocational Agriculture Instructors.

    ERIC Educational Resources Information Center

    Hedges, Lowell E., Ed.; Miller, Larry E., Ed.

    This notebook provides vocational agricultural teachers with 10 detailed lesson plans on the major topic of energy management in agriculture. The lesson plans present information about energy and the need to manage it wisely, using a problem-solving approach. Each lesson plan follows this format: lesson topic, lesson performance objectives,…

  15. Idaho National Laboratory Cultural Resource Management Plan

    SciT

    Lowrey, Diana Lee

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Officemore » will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  16. Idaho National Laboratory Cultural Resource Management Plan

    SciT

    Julie Braun Williams

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Officemore » will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  17. Idaho National Laboratory Cultural Resource Management Plan

    SciT

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Officemore » will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  18. Astronomical Instrumentation Systems Quality Management Planning: AISQMP

    NASA Astrophysics Data System (ADS)

    Goldbaum, Jesse

    2017-06-01

    The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  19. A groundwater management plan for Stuttgart.

    PubMed

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater. Copyright © 2015 Elsevier B.V. All rights reserved.

  20. Development of direct multi-hazard susceptibility assessment method for post-earthquake reconstruction planning in Nepal

    NASA Astrophysics Data System (ADS)

    Mavrouli, Olga; Rana, Sohel; van Westen, Cees; Zhang, Jianqiang

    2017-04-01

    After the devastating 2015 Gorkha earthquake in Nepal, reconstruction activities have been delayed considerably, due to many reasons, of a political, organizational and technical nature. Due to the widespread occurrence of co-seismic landslides, and the expectation that these may be aggravated or re-activated in future years during the intense monsoon periods, there is a need to evaluate for thousands of sites whether these are suited for reconstruction. In this evaluation multi-hazards, such as rockfall, landslides, debris flow, and flashfloods should be taken into account. The application of indirect knowledge-based, data-driven or physically-based approaches is not suitable due to several reasons. Physically-based models generally require a large number of parameters, for which data is not available. Data-driven, statistical methods, depend on historical information, which is less useful after the occurrence of a major event, such as an earthquake. Besides, they would lead to unacceptable levels of generalization, as the analysis is done based on rather general causal factor maps. The same holds for indirect knowledge-driven methods. However, location-specific hazards analysis is required using a simple method that can be used by many people at the local level. In this research, a direct scientific method was developed where local level technical people can easily and quickly assess the post-earthquake multi hazards following a decision tree approach, using an app on a smartphone or tablet. The methods assumes that a central organization, such as the Department of Soil Conservation and Watershed Management, generates spatial information beforehand that is used in the direct assessment at a certain location. Pre-earthquake, co-seismic and post-seismic landslide inventories are generated through the interpretation of Google Earth multi-temporal images, using anaglyph methods. Spatial data, such as Digital Elevation Models, land cover maps, and geological maps are

  1. 78 FR 13316 - National Forest System Land Management Planning Directives

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... responsibilities. It should be used in conjunction with the FSH. FSH 1909.12--Land Management Planning Handbook... management planning. Forest Service Handbook 1909.15, section 31.12 (57 FR 43208; September 18, 1992... DEPARTMENT OF AGRICULTURE Forest Service RIN 0596-AD06 National Forest System Land Management...

  2. 77 FR 44144 - National Forest System Land Management Planning; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendments. SUMMARY: The Department of Agriculture (USDA) published a National Forest System land management planning rule in the... document may be sent to the Director, Ecosystem Management Coordination Staff, USDA Forest Service, 1400...

  3. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning guidance. 1610.1 Section 1610.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING...

  4. The Spanish General Radioactive Waste Management Plan

    SciT

    Espejo, J.M.; Abreu, A.

    This paper mainly describes the strategies, the necessary actions and the technical solutions to be developed by ENRESA in the short, medium and long term, aimed at ensuring the adequate management of radioactive waste, the dismantling and decommissioning of nuclear and radioactive facilities and other activities, including economic and financial measures required to carry them out. Starting with the Spanish administrative organization in this field, which identifies the different agents involved and their roles, and after referring to the waste generation, the activities to be performed in the areas of LILW, SF and HLW management, decommissioning of installations and othersmore » are summarized. Finally, the future management costs are estimated and the financing system currently in force is explained. The so-called Sixth General Radioactive Waste Plan (6. GRWP), approved by the Spanish Government, is the 'master document' of reference where all the above mentioned issues are contemplated. In summary: The 6. GRWP includes the strategies and actions to be performed by Enresa in the coming years. The document, revised by the Government and subject to a process of public information, underlines the fact that Spain possesses an excellent infrastructure for the safe and efficient management of radioactive waste, from the administrative, technical and economic-financial points of view. From the administrative point of view there is an organisation, supported by ample legislative developments, that contemplates and governs the main responsibilities of the parties involved in the process (Government, CSN, ENRESA and waste producers). As regards the technical aspect, the experience accumulated to date by Enresa is particularly significant, as are the technologies now available in the field of management and for dismantling processes. As regards the economic-financial basis, a system is in place that guarantees the financing of radioactive waste management costs. This

  5. Management of limb fractures in a teaching hospital: comparison between Wenchuan and Yushu earthquakes.

    PubMed

    Min, Li; Tu, Chong-qi; Liu, Lei; Zhang, Wen-li; Yi, Min; Song, Yue-ming; Huang, Fu-guo; Yang, Tian-fu; Pei, Fu-xing

    2013-01-01

    To comparatively analyze the medical records of patients with limb fractures as well as rescue strategy in Wenchuan and Yushu earthquakes so as to provide references for post-earthquake rescue. We retrospectively investigated 944 patients sustaining limb fractures, including 891 in Wenchuan earthquake and 53 in Yushu earthquake, who were admitted to West China Hospital (WCH) of Sichuan University. In Wenchuan earthquake, WCH met its three peaks of limb fracture patients influx, on post-earthquake day (PED) 2, 8 and 14 respectively. Between PED 3-14, 585 patients were transferred from WCH to other hospitals outside the Sichuan Province. In Yushu earthquake, the maximum influx of limb fracture patients happened on PED 3, and no one was shifted to other hospitals. Both in Wenchuan and Yushu earthquakes, most limb fractures were caused by blunt strike and crush/burying. In Wenchuan earthquake, there were 396 (396/942, 42.0%) open limb fractures, including 28 Gustilo I, 201 Gustilo II and 167 Gustilo III injuries. But in Yushu earthquake, the incidence of open limb fracture was much lower (6/61, 9.8%). The percent of patients with acute complications in Wenchuan earthquake (167/891, 18.7%) was much higher than that in Yushu earthquake (5/53, 3.8%). In Wenchuan earthquake rescue, 1 018 surgeries were done, composed of debridement in 376, internal fixation in 283, external fixation in 119, and vacuum sealing drainage in 117, etc. While among the 64 surgeries in Yushu earthquake rescue, the internal fixation for limb fracture was mostly adopted. All patients received proper treatment and survived except one who died due to multiple organs failure in Wenchuan earthquake. Provision of suitable and sufficient medical care in a catastrophe can only be achieved by construction of sophisticated national disaster medical system, prediction of the injury types and number of injuries, and confirmation of participating hospitals?exact role. Based on the valuable rescue experiences

  6. DESC (Defense Electronics Supply Center) Total Quality Management Plan

    DTIC Science & Technology

    1989-04-01

    Paoerwort Reduction Proodt(0704.01 ge. Washington. DC 20S03 4. TITLE AND SUBTITLE Api598 . FUNDING NUMBERS DESC Total Quality Management Master Plan...OF PAGES TQM (Total Quality Management ), Continuous Process Improvement,_________ cTainingManagement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18... QUALITY MANAGEMENT As you read the DESC Total Quality Management Plan, I ask each of you to make a commitment to continuously strive for improvement

  7. Space telescope observatory management system preliminary test and verification plan

    NASA Technical Reports Server (NTRS)

    Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.

    1982-01-01

    The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.

  8. Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan

    DOT National Transportation Integrated Search

    2017-10-17

    This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...

  9. Creating a Global Building Inventory for Earthquake Loss Assessment and Risk Management

    Jaiswal, Kishor; Wald, David J.

    2008-01-01

    Earthquakes have claimed approximately 8 million lives over the last 2,000 years (Dunbar, Lockridge and others, 1992) and fatality rates are likely to continue to rise with increased population and urbanizations of global settlements especially in developing countries. More than 75% of earthquake-related human casualties are caused by the collapse of buildings or structures (Coburn and Spence, 2002). It is disheartening to note that large fractions of the world's population still reside in informal, poorly-constructed & non-engineered dwellings which have high susceptibility to collapse during earthquakes. Moreover, with increasing urbanization half of world's population now lives in urban areas (United Nations, 2001), and half of these urban centers are located in earthquake-prone regions (Bilham, 2004). The poor performance of most building stocks during earthquakes remains a primary societal concern. However, despite this dark history and bleaker future trends, there are no comprehensive global building inventories of sufficient quality and coverage to adequately address and characterize future earthquake losses. Such an inventory is vital both for earthquake loss mitigation and for earthquake disaster response purposes. While the latter purpose is the motivation of this work, we hope that the global building inventory database described herein will find widespread use for other mitigation efforts as well. For a real-time earthquake impact alert system, such as U.S. Geological Survey's (USGS) Prompt Assessment of Global Earthquakes for Response (PAGER), (Wald, Earle and others, 2006), we seek to rapidly evaluate potential casualties associated with earthquake ground shaking for any region of the world. The casualty estimation is based primarily on (1) rapid estimation of the ground shaking hazard, (2) aggregating the population exposure within different building types, and (3) estimating the casualties from the collapse of vulnerable buildings. Thus, the

  10. 43 CFR 10005.15 - Planning and management techniques applicable to the plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... applicable to the plan. 10005.15 Section 10005.15 Public Lands: Interior Regulations Relating to Public Lands... AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.15 Planning and management techniques applicable to the plan. The Commission recognizes that there are a wide range of techniques that...

  11. Community participation in fire management planning: The Trinity county fire safe council's fire plan

    Yvonne Everett

    2008-01-01

    In 1999, Trinity County CA, initiated a participatory fire management planning effort. Since that time, the Trinity County Fire Safe Council has completed critical portions of a fire safe plan and has begun to implement projects defined in the plan. Completion of a GIS based, landscape scale fuels reduction element in the plan defined by volunteer fire fighters, agency...

  12. Turn over folders: a proven tool in succession management planning.

    PubMed

    Engells, Thomas E

    2011-01-01

    The dual challenges of succession management and succession management planning are considerable. A tool, the Turn over Folder, was introduced and described in detail as a useful first step in succession management planning. The adoption of that tool will not in itself produce a succession management plan, but it will orientate the organization and its members to the reality of succession management in all important leadership and critical positions. Succession management is an important consideration in all progressive organizations and well worth the effort.

  13. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  14. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    SciT

    Parr, P.D.; Evans, J.W.

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selectedmore » species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.« less

  15. Information System Development: Phase I, Management Planning.

    ERIC Educational Resources Information Center

    Woods, Bill M.

    Objectives of this study of the operations of Engineering Index were to: (1) determine the need for a planning capability, (2) blueprint a mechanism to accomplish planning, and (3) recommend priorities requiring planning attention. Topics considered in the study are planning, the role of the board of directors and trustees, organizational…

  16. The strategic planning of health management information systems.

    PubMed

    Smith, J

    1995-01-01

    This paper discusses the roles and functions of strategic planning of information systems in health services. It selects four specialised methodologies of strategic planning for analysis with respect to their applicability in the health field. It then examines the utilisation of information planning in case studies of three health organisations (two State departments of health and community services and one acute care institution). Issues arising from the analysis concern the planning process, the use to which plans are put, and implications for management.

  17. [Association between evacuation condition and habitual physical activity in Great East Japan Earthquake evacuees: The Fukushima Health Management Survey].

    PubMed

    Nagai, Masato; Ohira, Tetsuya; Yasumura, Seiji; Takahashi, Hideto; Yuki, Michiko; Nakano, Hironori; Wen, Zhang; Yabe, Hirooki; Ohtsuru, Akira; Maeda, Masaharu; Takase, Kanae

    2016-01-01

    Objectives: Prevalence of life-style disease has increased dramatically in evacuees due to the Great East Japan Earthquake. One reason may be that physical activity level decreased from life environment changes due to evacuation. However, associations between evacuation condition and habitual physical activity have not been studied. We examined this association in Fukushima residents who participated in the Fukushima Health Management Survey. Methods: In this study, 37,843 evacuees from 13 municipal evacuation zones from the nuclear-power accident caused by the Great East Japan Earthquake, born before April 1, 1995, were included in the analysis. Evacuation condition was defined by disaster living place (13 zones), evacuation place (inside or outside the prefecture), and current living status (evacuation shelter or temporary housing, rental housing/ apartment, and relative's home or own home). Habitual physical activity was defined from self-administered questionnaires as participants who responded "almost every day" and "2-4 times/week" of regular exercise. In the analysis, habitual physical activity prevalence was aggregated by gender and variables (living place in the disaster, evacuation place, and current living status). Prevalence was adjusted for age, disaster living place, evacuation place, and current living status by standard analysis of covariance methods. Results: Adjusted prevalences of habitual physical activity were: men, 27.9-46.5%; women, 27.0-43.7% in each disaster living place. The differences were 18.6% point in men and 16.7% point in women. For evacuation place, physical activity outside the prefecture for men (37.7%) and inside the prefecture for women (32.1%) were higher, but those differences were only 2.2% point and 1.8% point in men and women, respectively. For current living status, physical activity of those in rental housing/ apartment was the lowest; evacuation shelter or temporary housing was the highest in both genders (men: 38

  18. 78 FR 70012 - Lake Tahoe Basin Management Unit, California, Land Management Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... DEPARTMENT OF AGRICULTURE Forest Service Lake Tahoe Basin Management Unit, California, Land Management Plan Revision AGENCY: Lake Tahoe Basin Management Unit, Forest Service, USDA. ACTION: Notice of... for the Lake Tahoe Basin Management Unit (LTBMU) Land Management Plan Revision available for the 60...

  19. Tribal Decisions-Makers Guide to Solid Waste Management: Chapter 2 - Developing Solid Waste Management Plans

    EPA Pesticide Factsheets

    Solid waste management plans offer a host of benefits for tribes and Alaskan Native villages. Through the preparation of these plans, you can assess your cur-rent and future waste management needs, set priorities, and allocate resources accordingly.

  20. Planned special events : cost management and cost recovery

    DOT National Transportation Integrated Search

    2009-05-01

    This purpose of this primer is to aid jurisdictions and agencies, especially Departments of Transportation, with identifying and managing the costs of planned special events (PSEs) and forming policy for cost recovery. Cost management the effectiv...

  1. Guidelines for developing traffic incident management plans for work zones

    DOT National Transportation Integrated Search

    2003-09-01

    The Colorado Department of Transportation (CDOT) has led the development of a number of traffic incident management plans and programs throughout the state. These programs address procedural and coordination aspects of managing unplanned events on th...

  2. Guidelines for developing transportation management plans in Virginia.

    DOT National Transportation Integrated Search

    2005-01-01

    A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...

  3. Development of Kentucky's highway incident management strategic plan.

    DOT National Transportation Integrated Search

    2005-05-01

    ven though Kentucky has undertaken many initiatives to improve specific aspects of incident management, there has never been a plan that establishes an overall framework for a systematic, statewide, multi-agency effort to improve the management of hi...

  4. Cost accounting, management control, and planning in health care.

    PubMed

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)

  5. Wilderness management through voluntary behavior change: an evaluation of the Pemigewasset Wilderness Management Plan

    John M. Halstead; Cindy M. Brown; Albert E. Luloff; Bruce E. Lindsay

    1992-01-01

    The management plan for the Pemigewasset Wilderness Area of New Hampshire represents a departure from traditional plans. Results of this study indicate limited evidence of the Pemigewasset Wilderness Management Plan (PWMP), as currently implemented, having a large direct impact on diverting hikers from their planned destinations and promoting dispersed usage and low...

  6. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  7. Chloropicrin Fumigant Management Plan Phase 2 Templates

    EPA Pesticide Factsheets

    These forms provide a framework for detailing the FMP elements of pesticide products containing the active ingredient chloropicrin, including application block, buffer zones, emergency response plan, tarp plan, soil conditions, and air monitoring.

  8. Dazomet Fumigant Management Plan Phase 2 Templates

    EPA Pesticide Factsheets

    These templates provide a framework for reporting application block information, buffer zones, emergency response plan, tarp plan, soil conditions, air monitoring, and more for pesticide products containing the active ingredient dazomet, such as Basamid G.

  9. Effect of medical institution change on gestational duration after the Great East Japan Earthquake: The Fukushima Health Management Survey.

    PubMed

    Suzuki, Kohta; Goto, Aya; Fujimori, Keiya

    2016-12-01

    The aim of this study was to examine the association between medical institution change for perinatal care and gestational duration after the Great East Japan Earthquake using data from the Fukushima Health Management Survey. The data of pregnant women who experienced the earthquake in Fukushima prefecture and participated in the Pregnancy and Birth Survey as part of the Fukushima Health Management Survey were analyzed. The primary and secondary outcomes of this study were gestational duration and preterm birth, respectively. The main study factor was prenatal checkup institution (only one institution, changed institution due to self-referral, changed institution due to medical indication, and went to parents' home for childbirth). Self-referral was considered as indicative of relocation after the disaster. Multiple linear and logistic regression analyses were conducted to examine the effect of earthquake on each outcome. A total of 5593 (60.2%) participants experienced the earthquake between the 4th and 37th weeks of their gestational period. After controlling for variables, pregnant women who changed their perinatal checkup institution due to medical indication were significantly associated with shorter gestational duration (β = -10.6, P < 0.001) and preterm birth (adjusted odds ratio, 8.5; 95% confidence interval, 5.8-12.5) compared with women who visited only one institution. Self-referral, however, was not significantly associated with the outcomes. According to prenatal checkup status, our results suggest that the effect on gestational duration of the Great East Japan Earthquake and the subsequent Fukushima Daiichi nuclear disaster was not significant. © 2016 Japan Society of Obstetrics and Gynecology.

  10. Kalaupapa National Historic Park Air Tour Management Plan planning and NEPA scoping study

    DOT National Transportation Integrated Search

    2005-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kalaupapa Historic Park pursuant to the National Parks Air Tour Management Act of ...

  11. Kaloko-Honokohau National Historical Park Air Tour Management Plan planning and NEPA scoping document

    DOT National Transportation Integrated Search

    2004-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kaloko-Honokohau Historic Park pursuant to the National Parks Air Tour Management ...

  12. Nurse manager succession planning: synthesis of the evidence.

    PubMed

    Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria

    2013-10-01

    The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.

  13. Strategic planning applied to quality in asthma management for children.

    PubMed

    Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M

    1993-01-01

    This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.

  14. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    ERIC Educational Resources Information Center

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  15. Strategic planning for health care management information systems.

    PubMed

    Rosenberger, H R; Kaiser, K M

    1985-01-01

    Using a planning methodology and a structured design technique for analyzing data and data flow, information requirements can be derived to produce a strategic plan for a management information system. Such a long-range plan classifies information groups and assigns them priorities according to the goals of the organization. The approach emphasizes user involvement.

  16. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  17. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2023 Section 35.2023 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality management planning. (a) From funds...

  18. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2102 Section 35.2102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant...

  19. Academic Unit Planning and Management. Technical Report No. 75.

    ERIC Educational Resources Information Center

    Miyataki, Glenn K.; Byers, Maureen L.

    Intended to provide a systematic aid for planning and managing academic units (schools, colleges, departments, or divisions) within an institution, the Academic Unit Planning and Management (AUPM) manual consists of a multifaceted set of techniques and procedures that can be used by academic unit administrators. Data regarding academic unit…

  20. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  1. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  2. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  3. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  4. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant assistance can be awarded for any treatment works project, the Regional... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35...

  5. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1...

  6. Space station human productivity study. Volume 5: Management plans

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

  7. A ten-step process to develop case management plans.

    PubMed

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  8. Configuration Management Plan for the Tank Farm Contractor

    SciT

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  9. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  10. The Con Edison Emergency Child Care Plan for Management Employees: Summary Plan Description.

    ERIC Educational Resources Information Center

    Consolidated Edison Co., Brooklyn, NY.

    This summary plan description offers guidelines for participation in a pilot program that provides short-term emergency care for children of Con Edison managers who are under 13 years old. The plan offers professional, in-home child care that can be used when usual arrangements have collapsed. The summary plan description addresses the following…

  11. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    DOT National Transportation Integrated Search

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  12. Planning and management of cloud computing networks

    NASA Astrophysics Data System (ADS)

    Larumbe, Federico

    The evolution of the Internet has a great impact on a big part of the population. People use it to communicate, query information, receive news, work, and as entertainment. Its extraordinary usefulness as a communication media made the number of applications and technological resources explode. However, that network expansion comes at the cost of an important power consumption. If the power consumption of telecommunication networks and data centers is considered as the power consumption of a country, it would rank at the 5 th place in the world. Furthermore, the number of servers in the world is expected to grow by a factor of 10 between 2013 and 2020. This context motivates us to study techniques and methods to allocate cloud computing resources in an optimal way with respect to cost, quality of service (QoS), power consumption, and environmental impact. The results we obtained from our test cases show that besides minimizing capital expenditures (CAPEX) and operational expenditures (OPEX), the response time can be reduced up to 6 times, power consumption by 30%, and CO2 emissions by a factor of 60. Cloud computing provides dynamic access to IT resources as a service. In this paradigm, programs are executed in servers connected to the Internet that users access from their computers and mobile devices. The first advantage of this architecture is to reduce the time of application deployment and interoperability, because a new user only needs a web browser and does not need to install software on local computers with specific operating systems. Second, applications and information are available from everywhere and with any device with an Internet access. Also, servers and IT resources can be dynamically allocated depending on the number of users and workload, a feature called elasticity. This thesis studies the resource management of cloud computing networks and is divided in three main stages. We start by analyzing the planning of cloud computing networks to get a

  13. Data management and processing plan, Department of Applied Geodesy

    SciT

    Not Available

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.

  14. Manager's assistant systems for space system planning

    NASA Technical Reports Server (NTRS)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  15. A global building inventory for earthquake loss estimation and risk management

    Jaiswal, K.; Wald, D.; Porter, K.

    2010-01-01

    We develop a global database of building inventories using taxonomy of global building types for use in near-real-time post-earthquake loss estimation and pre-earthquake risk analysis, for the U.S. Geological Survey's Prompt Assessment of Global Earthquakes for Response (PAGER) program. The database is available for public use, subject to peer review, scrutiny, and open enhancement. On a country-by-country level, it contains estimates of the distribution of building types categorized by material, lateral force resisting system, and occupancy type (residential or nonresidential, urban or rural). The database draws on and harmonizes numerous sources: (1) UN statistics, (2) UN Habitat's demographic and health survey (DHS) database, (3) national housing censuses, (4) the World Housing Encyclopedia and (5) other literature. ?? 2010, Earthquake Engineering Research Institute.

  16. Effects of catastrophic events on transportation system management and operations : Northridge earthquake -- January 17, 1994

    DOT National Transportation Integrated Search

    2002-04-22

    This report documents the actions taken by transportation agencies in response to the earthquake in Northridge, California on January 17, 1994, and is part of a larger effort to examine the impacts of catastrophic events on transportation system faci...

  17. Managing Uncertainty: Thinking and Planning Strategically.

    ERIC Educational Resources Information Center

    Lorenzo, Albert L.

    1993-01-01

    Argues that rapid change and tight resources demand reality-based planning, rather than planning models that ignore internal and external customers or emphasize process over product. Describes the Strategic Guidance Model (SGM) which provides colleges with strategic visioning, organizational assessment, environmental scanning, quality improvement,…

  18. Short Range Planning for Educational Management.

    ERIC Educational Resources Information Center

    Turksen, I. B.; Holzman, A. G.

    A planning cycle for any autonomous university entity contains five basic processes: information storage and retrieval forecasting, resource allocation, scheduling, and a term of study with a feedback loop. The resource allocation process is investigated for the development of shortrange planning models. Dynamic models wth linear and quadratic…

  19. Nurse manager succession planning: A cost-benefit analysis.

    PubMed

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  20. Tank waste remediation system configuration management implementation plan

    SciT

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  1. The Great East Japan Earthquake: a need to plan for post-disaster surveillance in developed countries

    PubMed Central

    Matsui, Tamano; Partridge, Jeffrey; Kasai, Takeshi

    2011-01-01

    After a devastating earthquake and tsunami struck north-eastern Japan in March 2011, the public health system, including the infectious disease surveillance system, was severely compromised. While models for post-disaster surveillance exist, they focus predominantly on developing countries during the early recovery phase. Such models do not necessarily apply to developed countries, which differ considerably in their baseline surveillance systems. Furthermore, there is a need to consider the process by which a surveillance system recovers post-disaster. The event in Japan has highlighted a need to address these concerns surrounding post-disaster surveillance in developed countries. In May 2011, the World Health Organization convened a meeting where post-disaster surveillance was discussed by experts and public health practitioners. In this paper, we describe a post-disaster surveillance approach that was discussed at the meeting, based on what had actually occurred and what may have been, or would be, ideal. Briefly, we describe the evolution of a surveillance system as it returns to the pre-existing system, starting from an event-based approach during the emergency relief phase, a syndromic approach during the early recovery phase, an enhanced sentinel approach during the late recovery phase and a return to baseline during the development phase. Our aim is not to recommend a specific model but to encourage other developed countries to initiate their own discussions on post-disaster surveillance and develop plans according to their needs and capacities. As natural disasters will continue to occur, we hope that developing such plans during the “inter-disaster” period will help mitigate the surveillance challenges that will arise post-disaster. PMID:23908893

  2. Developing Tribal Integrated Waste Management Plans

    EPA Pesticide Factsheets

    An IWMP outlines how the tribe will reduce, manage, and dispose of its waste. It identifies existing waste systems, assesses needs, and sets forth the ways to design, implement, and monitor a more effective and sustainable waste management program.

  3. 40 CFR 52.1395 - Smoke management plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Smoke management plan. 52.1395 Section 52.1395 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Department considers smoke management techniques for agriculture and forestry management burning purposes as...

  4. 40 CFR 52.1395 - Smoke management plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Smoke management plan. 52.1395 Section 52.1395 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Department considers smoke management techniques for agriculture and forestry management burning purposes as...

  5. 31 CFR 206.6 - Cash management planning and review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Cash management planning and review. 206.6 Section 206.6 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE MANAGEMENT OF FEDERAL AGENCY...

  6. 14 CFR 136.39 - Air tour management plans (ATMP).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Air tour management plans (ATMP). 136.39 Section 136.39 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... TOURS AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.39 Air tour...

  7. Tank waste remediation system tank waste retrieval risk management plan

    SciT

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  8. Finance and supply management project execution plan

    SciT

    BENNION, S.I.

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  9. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  10. Learning to manage a complex ecosystem: adaptive management and the Northwest Forest Plan.

    George H. Stankey; Roger N. Clark; Bernard T. Bormann

    2006-01-01

    The Northwest Forest Plan (the Plan) identifies adaptive management as a central strategy for effective implementation. Despite this, there has been a lack of any systematic evaluation of its performance. This study is based on an extensive literature review, 50 interviews with resource managers and scientists involved with the Plan’s implementation, and a survey of...

  11. Natural Resource Management Plan for Brookhaven National Laboratory

    SciT

    green, T.

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by themore » Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  12. Portland regionwide advanced traffic management system plan

    DOT National Transportation Integrated Search

    1993-10-01

    The Portland Regional Transportation Plan indicates that by the year 2010, $5 billion dollars will be spent on transportation, and the region will have even more congestion on major corridors than today. The Portland region cannot rid itself of co...

  13. Research needs in transportation planning and management.

    DOT National Transportation Integrated Search

    1977-01-01

    In 1974, legislation enacted by the General Assembly to expand the responsibilities and duties of the former Virginia Department of Highways, with the main new assignment being in the area of planning. The agency was now designated the Virginia Depar...

  14. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    PubMed

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  15. Assessing hospital emergency management plans: a guide for infection preventionists.

    PubMed

    Rebmann, Terri

    2009-11-01

    Hospital emergency management plans are essential and must include input from an infection preventionist (IP). Multiple hospital planning documents exist, but many do not address infection prevention issues, combine them with noninfection prevention issues, or are disease/event specific. An all-encompassing emergency management planning guide for IPs is needed. A literature review and Internet search were conducted in December 2008. Data from relevant sources were extracted. A spreadsheet was created that delineated hospital emergency management plan components of interest to IPs. Of the sources screened, 49 were deemed relevant. Eleven domains were identified: (1) having a plan; (2) assessing hospital readiness; (3) having infection prevention policies and procedures; (4) having occupational health policies and procedures; (5) conducting surveillance and triage; (6) reporting incidents, having a communication plan, and managing information; (7) having laboratory support; (8) addressing surge capacity issues; (9) having anti-infective therapy and/or vaccines; (10) providing infection prevention education; and (11) managing physical plant issues. Infection preventionists should use this article as an assessment tool for evaluating their hospital emergency management plan and for developing policies and procedures that will decrease the risk of infection transmission during a mass casualty event.

  16. EPA Region 3 Quality Management Plans

    EPA Pesticide Factsheets

    Has links to resources that describe the Region's Quality Assurance Program, which is a collection of the Region's ongoing quality assurance (QA) policies, procedures, responsibilities and management systems.

  17. Total Quality Management Implementation Plan: Defense Depot, Ogden

    DTIC Science & Technology

    1989-07-01

    NUMBERS Total Quality Management Implementation Plan Defense Depot Ogden 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...PAGES TQM (Total Quality Management ), Continuous Process Improvement, Depot Operations, Process Action Teams 16. PRICE CODE 17. SECURITY...034 A Message From The Commander On Total Quality Management i fully support the DLA aoproacii to Total Quality Management . As stated by General

  18. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  19. 51. Roof plans, General Services Administration, Construction Management Division, Region ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Roof plans, General Services Administration, Construction Management Division, Region 2, New York, October 29, 1976. Scale 1/31=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  20. Managed Care Plans: Getting Good Care for Your Child

    MedlinePlus

    ... AAP Find a Pediatrician Family Life Medical Home Health Insurance Pediatric Specialists Family Dynamics Media Work & Play Getting ... Your Community Healthy Children > Family Life > Medical Home > Health Insurance > Managed Care Plans: Getting Good Care for Your ...

  1. Fact Sheet: Risk Management Plan (RMP) Audit Program

    EPA Pesticide Factsheets

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  2. Managing travel for planned special events handbook : executive summary

    DOT National Transportation Integrated Search

    2007-06-01

    This report was written to communicate new and proven institutional and high-level operational techniques and strategies for achieving a coordinated, proactive approach to managing travel for all planned special events in a region in addition to faci...

  3. Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans

    EPA Pesticide Factsheets

    The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.

  4. Comparison of the NCRA and NAACCR Strategic Management Plans.

    PubMed

    Menck, Herman R

    2012-01-01

    The Strategic Management Plans of the National Cancer Registrars Association (NCRA) and the North American Association of Central Cancer Registries (NAACCR) were compared, and differences noted. No uncovered subject areas were found.

  5. Planning Management Training Programs for Organizational Development

    ERIC Educational Resources Information Center

    Alpander, Guvenc G.

    1974-01-01

    To investigate means of converting management development programs into a successful organizational development process, managers' attitudes toward centralization and decentralization of functions and decisions, the importance of performed functions, their personal effectiveness, their managerial style, and what they prefer for executive…

  6. Spent Nuclear Fuel Project Configuration Management Plan

    SciT

    Reilly, M.A.

    This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.

  7. Planning and Managing the Campus Facilities Portfolio

    ERIC Educational Resources Information Center

    Daigneau, William A., Ed.

    2003-01-01

    The campus and facilities of a college should be managed using the same principles as any other investment in an institution's financial portfolio. Stemming from the APPA/National Association of College & University Business Officers (NACUBO) Institute for Facilities Finance, this book addresses the totality of managing the facilities investment…

  8. Language Planning, Channel Management, and ESP.

    ERIC Educational Resources Information Center

    Kennedy, Chris

    Channel management, a concept developed in marketing to refer to the process by which a product is moved from production to consumption, uses a channel of distribution operating at several levels, each responsible for one or more of the activities of moving the product forward to the consumer. The function of channel management is to select the…

  9. Incident Management Organization succession planning stakeholder feedback

    Anne E. Black

    2013-01-01

    This report presents complete results of a 2011 stakeholder feedback effort conducted for the National Wildfire Coordination Group (NWCG) Executive Board concerning how best to organize and manage national wildland fire Incident Management Teams in the future to meet the needs of the public, agencies, fire service and Team members. Feedback was collected from 858...

  10. Residuals Management and Water Pollution Control Planning.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Public Affairs.

    This pamphlet addresses the problems associated with residuals and water quality especially as it relates to the National Water Pollution Control Program. The types of residuals and appropriate management systems are discussed. Additionally, one section is devoted to the role of citizen participation in developing management programs. (CS)

  11. Opportunities for energy conservation in transportation planning and systems management.

    DOT National Transportation Integrated Search

    1978-01-01

    This report is a summary, based primarily on a literature review, of the energy-savings potential of the elements in the transportation planning process and systems management. Within the scope of long-range planning, the energy aspects of land use a...

  12. Forest management planning for timber production: a sequential approach

    Krishna P. Rustagi

    1978-01-01

    Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...

  13. Strategic planning features of subsurface management in Kemerovo Oblast

    NASA Astrophysics Data System (ADS)

    Romanyuk, V.; Grinkevich, A.; Akhmadeev, K.; Pozdeeva, G.

    2016-09-01

    The article discusses the strategic planning features of regional development based on the production and subsurface management in Kemerovo Oblast. The modern approach - SWOT analysis was applied to assess the regional development strategy. The estimation of regional development plan implementation was given for the foreseeable future.

  14. Information security management system planning for CBRN facilities

    SciT

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  15. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    EPA Science Inventory

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  16. Land management planning: a method of evaluating alternatives

    Andres Weintraub; Richard Adams; Linda Yellin

    1982-01-01

    A method is described for developing and evaluating alternatives in land management planning. A structured set of 15 steps provides a framework for such an evaluation. when multiple objectives and uncertainty must be considered in the planning process. The method is consistent with other processes used in organizational evaluation, and allows for the interaction of...

  17. Risk management and disaster recovery planning for online libraries.

    PubMed

    Uzwyshyn, Ray

    2015-01-01

    This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.

  18. Evaluating spatially explicit burn probabilities for strategic fire management planning

    C. Miller; M.-A. Parisien; A. A. Ager; M. A. Finney

    2008-01-01

    Spatially explicit information on the probability of burning is necessary for virtually all strategic fire and fuels management planning activities, including conducting wildland fire risk assessments, optimizing fuel treatments, and prevention planning. Predictive models providing a reliable estimate of the annual likelihood of fire at each point on the landscape have...

  19. Scientifically defensible fish conservation and recovery plans: Addressing diffuse threats and developing rigorous adaptive management plans

    Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy

    2016-01-01

    We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.

  20. Entrepreneurship through Strategic Planning, Management, and Evaluation.

    ERIC Educational Resources Information Center

    Groff, Warren H.

    A process to assess a college's external environment and audit its internal environment in order to pursue options available to postsecondary education is described. Essentially the concept is one of matching opportunities in the external environment with institutional strengths as determined by an internal audit. Strategic planning must consider…

  1. Planning, Management, and Economics of Airport Operation

    NASA Technical Reports Server (NTRS)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  2. Integrating Risk Management and Strategic Planning

    ERIC Educational Resources Information Center

    Achampong, Francis K.

    2010-01-01

    Strategic planning is critical to ensuring that institutions of higher education thoughtfully and systematically position themselves to accomplish their mission, vision, and strategic goals, particularly when these institutions face a myriad of risks that can negatively impact their continued financial viability and compromise their ability to…

  3. Specialty pharmaceuticals: developing a management plan.

    PubMed

    Willcutts, Dave

    2002-01-01

    This is the first in a series of articles that address the complex issues associated with specialty pharmaceuticals in the development of a successful specialty pharmaceutical program, a critical component of managing this high-cost and highly fragmented sector. This article focuses on how to define specialty pharmaceuticals. Other articles in this series will explore such topics as the mechanics of developing and managing a specialty pharmaceutical program, how and when to establish clinical protocols and authorizations, the importance of data management, and the benefits from automated processes.

  4. Managed care redux: health plans shift responsibilities to consumers.

    PubMed

    Draper, Debra A; Claxton, Gary

    2004-03-01

    Confronted with conflicting pressures to stem double-digit premium increases and provide unfettered access to care, health plans are developing products that shift more financial and care management responsibilities to consumers, according to findings from the Center for Studying Health System Change's (HSC) 2002-03 site visits to 12 nationally representative communities. Plans are pursuing these strategies in collaboration with employers that want to gain control over rapidly rising premiums while continuing to respond to employee demands for less restrictive managed care practices. Mindful of the managed care backlash, health plans also are stepping up utilization management activities for high-cost services and focusing care management on high-cost patients. While the move toward greater consumer engagement is clear, the impact on costs and consumer willingness to assume these new responsibilities remain to be seen.

  5. Haleakala National Park Air Tour Management Plan: Planning and NEPA Scoping Document

    DOT National Transportation Integrated Search

    2004-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of Air Tour Management Plans (ATMPs) for Haleakala National Park, Hawaii Volcanoes National Park and Kalaupapa National Hist...

  6. Hawaii Volcanoes National Park Air Tour Management Plan: Planning and NEPA Scoping Document

    DOT National Transportation Integrated Search

    2004-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of Air Tour Management Plans (ATMPs) for Haleakala National Park, Hawaii Volcanoes National Park, Puukohola Heiau National H...

  7. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciT

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetationmore » of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.« less

  8. Information needs for natural fire management planning

    Parsons, David; Bancroft, Larry; Nichols, Thomas; Stohlgren, Thomas

    1985-01-01

    The development and implementation of an effective natural fire management program require a clear definition of goals and objectives, an ever-expanding information base, and effective program evaluation. Examples are given from Sequoia and Kings Canyon National Parks.

  9. National Airspace System interface management plan

    DOT National Transportation Integrated Search

    1986-01-01

    This document is intended to implement Interface Management for interfacing subsystems of the National Airspace System (NAS) and for external NAS interfaces by establishing a process which assures that: Interface requirements are agreed to by interfa...

  10. Quality Management Plan for EPA Region 1

    EPA Pesticide Factsheets

    The QMP describes policies, procedures & management systems within EPA NE that govern quality assurance & quality control activities supporting the transparency & scientific defensibility of environmental data collected, used & disseminated by the Region.

  11. Financial performance of health plans in Medicaid managed care.

    PubMed

    McCue, Mike

    2012-01-01

    This study assesses the financial performance of health plans that enroll Medicaid members across the key plan traits, specifically Medicaid dominant, publicly traded, and provider-sponsored. National Association of Insurance Commissioners (NAIC) financial data, coupled with selected state financial data, were analyzed for 170 Medicaid health plans for 2009. A mean test compared the mean values for medical loss, administrative cost, and operating margin ratios across these plan traits. Medicaid dominant plans are plans with 75 percent of their total enrollment in the Medicaid line of business. Plans that are Medicaid dominant and publicly traded incurred a lower medical loss ratio and higher administrative cost ratio than multi-product and non-publicly traded plans. Medicaid dominant plans also earned a higher operating profit margin. Plans offering commercial and Medicare products are operating at a loss for their Medicaid line of business. Health plans that do not specialize in Medicaid are losing money. Higher medical cost rather than administrative cost is the underlying reason for this financial loss. Since Medicaid enrollees do not account for their primary book of business, these plans may not have invested in the medical management programs to reduce inappropriate emergency room use and avoid costly hospitalization.

  12. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  13. 76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...

  14. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2899 Section 60.2899 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  15. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  16. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  17. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  18. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  19. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  20. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  1. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  2. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  3. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  4. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  5. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  6. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  7. Earthquake Education in Prime Time

    NASA Astrophysics Data System (ADS)

    de Groot, R.; Abbott, P.; Benthien, M.

    2004-12-01

    Since 2001, the Southern California Earthquake Center (SCEC) has collaborated on several video production projects that feature important topics related to earthquake science, engineering, and preparedness. These projects have also fostered many fruitful and sustained partnerships with a variety of organizations that have a stake in hazard education and preparedness. The Seismic Sleuths educational video first appeared in the spring season 2001 on Discovery Channel's Assignment Discovery. Seismic Sleuths is based on a highly successful curriculum package developed jointly by the American Geophysical Union and The Department of Homeland Security Federal Emergency Management Agency. The California Earthquake Authority (CEA) and the Institute for Business and Home Safety supported the video project. Summer Productions, a company with a reputation for quality science programming, produced the Seismic Sleuths program in close partnership with scientists, engineers, and preparedness experts. The program has aired on the National Geographic Channel as recently as Fall 2004. Currently, SCEC is collaborating with Pat Abbott, a geology professor at San Diego State University (SDSU) on the video project Written In Stone: Earthquake Country - Los Angeles. Partners on this project include the California Seismic Safety Commission, SDSU, SCEC, CEA, and the Insurance Information Network of California. This video incorporates live-action demonstrations, vivid animations, and a compelling host (Abbott) to tell the story about earthquakes in the Los Angeles region. The Written in Stone team has also developed a comprehensive educator package that includes the video, maps, lesson plans, and other supporting materials. We will present the process that facilitates the creation of visually effective, factually accurate, and entertaining video programs. We acknowledge the need to have a broad understanding of the literature related to communication, media studies, science education, and

  8. Department of Defense Energy Management Plan, 1980

    DTIC Science & Technology

    1980-07-01

    for Testing and Materials , and the Society of Automotive Engineers. Following successful corn- pletion of these tests , we will report the effect of...Shelf crude oil which we will exchange for military petroleum products. We plan to expand our access to government -owned crude oil thereafter as we gain...experience and as more crude oil becomes available. In early 1981 we will conduct a politico-military simulaton to test Defense contractual

  9. Strategic Mobility 21 Project Management Plan

    DTIC Science & Technology

    2006-09-29

    California Association of Governments (SCAG), and other stakeholders to transform the former military installation into a modern in-land distribution node... governments , including adversary governments , and may be exported. c. This statement may not be used on technical documents that formerly were...required updates of both the ICD and the Technical Plan. SM21 has established a consortium of public and private, governmental and non

  10. DCASR (Defense Contract Administration Services Region) Boston, Strategic/Total Quality Management Master Plan Using Management by Planning (MBP)

    DTIC Science & Technology

    1989-06-01

    employees. A policy consists of targets, plans, and target values. Policy Deployment: One English translation for hoshin kanri . (Others are management by...policy and hoshin planning.) Policy deployment orchestrates continuous improvement in a way that fosters individual initiative and alignment. Process

  11. 75 FR 63851 - Draft General Management Plan and Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... the Interior. ACTION: Notice of Availability of the Draft General Management Plan and Environmental... 63852

  12. 76 FR 11193 - Sequoia National Forest; California; Piute Mountains Travel Management Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... National Forest; California; Piute Mountains Travel Management Plan; Correction AGENCY: Forest Service... intent to prepare an environmental impact statement for the Piute Mountains Travel Management Plan. FOR...

  13. RISK MANAGEMENT RESEARCH PLAN FOR WET WEATHER FLOWS

    EPA Science Inventory

    This plan was prepared by the National Risk Management Research Laboratory (NRMRL) of EPA's Office of Research and Development (ORD) to guide the risk management aspects of the urban wet weather flow (WWF) research for the next five years. There are three types of urban WWF dis...

  14. Adding a landscape ecology perspective to conservation and management planning

    Kathryn E. Freemark; John R. Probst; John B. Dunning; Salllie J. Hejl

    1993-01-01

    We briefly review concepts in landscape ecology and discuss their relevance to the conservation and management of neotropical migrant landbirds. We then integrate a landscape perspective into a spatially-hierarchical framework for conservation and management planning for neotropical migrant landbirds (and other biota). The framework outlines a comprehensive approach by...

  15. Underground Test Area Subproject Project Management Plan, Revision 1

    SciT

    NONE

    1998-06-03

    This Project Management Plan (PMP) describes the manner in which the US Department of Energy Nevada Operations Office (DOE/NV) will manage the Underground Test Area (UGTA) Subproject at the Nevada Test Site (NTS). It provides the basic guidance for implementation and the organizational structure for meeting the UGTA objectives.

  16. Water Management Plan for Fort Buchanan, Puerto Rico

    SciT

    Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine

    2004-06-01

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.

  17. Adaptive management and the Northwest Forest Plan: rhetoric and reality.

    G.H. Stankey; B.T. Bormann; C. Ryan; B. Shindler; V. Sturtevant; R.N. Clark; C. Philpot

    2003-01-01

    Adaptive management represents a process to use management policies as a source of learning, which in turn can inform subsequent actions. However, despite its appealing and apparently straightforward objectives, examples of successful implementation remain elusive, and a review of efforts to implement an adaptive approach in the Northwest Forest Plan proves the point....

  18. Configuration management program plan for Hanford site systems engineering

    SciT

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  19. Considering communities in forest management planning in western Oregon.

    Ellen M. Donoghue; N. Lynnae Sutton; Richard W. Haynes

    2007-01-01

    A recurrent theme in the development of U.S. forest policies has been the assertion of strong positive relations among communities, economies, and natural resource management. Now as a new round of federal land management planning is getting underway, questions are being raised about the strength of that assertion and how to view communities following a decade of...

  20. Best management practices for creating a community wildfire protection plan

    Pamela J. Jakes; Christine Esposito; Sam Burns; Antony S. Cheng; Kristen C. Nelson; Victoria E. Sturtevant; Daniel R. Williams

    2012-01-01

    A community wildfire protection plan (CWPP) is a means of bringing local solutions to wildland fire management. In developing and implementing CWPPs, communities assume a leadership role in reducing wildfi re risk on federal and nonfederal land. In this publication, we identify best management practices for CWPP development and implementation based on the experiences...

  1. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  2. Perception of scale in forest management planning: Challenges and implications

    Swee May Tang; Eric J. Gustafson

    1997-01-01

    Forest management practices imposed at one spatial scale may affect the patterns and processes of ecosystems at other scales. These impacts and feedbacks on the functioning of ecosystems across spatial scales are not well understood. We examined the effects of silvicultural manipulations simulated at two spatial scales of management planning on landscape pattern and...

  3. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  4. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  5. Oak woodland conservation management planning in southern CA - lessons learned

    Rosi Dagit

    2015-01-01

    The California Oak Woodlands Conservation Act (AB 242 2001) established requirements for the preservation and protection of oak woodlands and trees, and allocated funding managed by the Wildlife Conservation Board. In order to qualify to use these funds, counties and cities need to adopt an oak conservation management plan. Between 2008 and 2011, a team of concerned...

  6. Developing a Classroom Management Plan Using a Tiered Approach

    ERIC Educational Resources Information Center

    Sayeski, Kristin L.; Brown, Monica R.

    2011-01-01

    In this article, the authors present a response-to-intervention (RTI) framework that both special and general education teachers can use in evaluating existing class structures and developing comprehensive classroom management plans for the purpose of managing challenging behaviors. They applied the concept of a three-tiered model of support at…

  7. Space Station thermal management system development status and plans

    NASA Technical Reports Server (NTRS)

    Rankin, J. G.

    1985-01-01

    The manned Space Station, as currently designed, contains a baseline thermal management system (TMS) which uses components and subsystems never before employed in manned spacecraft. The basis for the technology used in the TMS design is the result of a long-term TMS Technology Development Plan which was initiated in 1979. Rankin and Marshall (1983) have discussed the history and progress of that plan from its beginnings to early 1983. The present paper is concerned with the status of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) under this plan since 1983, taking into account also a summary of activities planned for the next several years.

  8. Defense Depot Mechanicsburg Total Quality Management Implementation Plan

    DTIC Science & Technology

    1989-06-01

    B T I TLEE 5 . FUNDING NUMBERS Defense Depot Mechanicsburg Total Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME...Form 298 (Rev. 2-89) L296- 102 Acces.ion For NYI J ... I:: ted DEFENSE DEPOT MECHANICSBURG PENNSYLVANIAL--I By_ TOTAL QUALITY MANAGEMENT K_~ t buty-n...IMPLEMENTATION PLAN Avmail-t!Ilty Codes IvLl c 2Dd/or JUN 3 0 1989 iDizt Special PURPOSE The purpose of this Total Quality Management Implementation

  9. Office of General Counsel Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    20503. IRT DATE 3. REPORT TYPE AND DATES COVERED y 1989 5. FUNDING NUMBERS Office of General Counsel Total Quality Management Plan 6. AUTHOR(S) 7...of General Counsel. - r DTIC 65 LE- E CTEn’" SEP291 989 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM (Total Quality Management ), Office of General...89) Pra-ifcr~bed ANSI Sid 139-1S ""-"’- ", ~ mmmmmu10n S S OFFICE OF GENERAL COUNSEL TOTAL QUALITY MANAGEMENT PLAN Acc’, ’ 7or. .?:" t ’_7 Codes K 89

  10. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  11. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  12. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  13. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  14. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  15. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  16. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  17. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  18. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  19. Shorebird and boater impact management planning

    Robert D. Deblinger; Jerry J. Vaske; Maureen P. Donnelly; Russ Hopping

    1992-01-01

    This paper integrates social and ecological impact data from a barrier beach to demonstrate the value of an inter-disciplinary approach to resource allocation and visitor management. The ecological data included observations of shorebird distributions and causes of human disturbance. The social data were obtained from on-site surveys of boaters and pedestrian visitors...

  20. Linking Strategic Planning and Management Control.

    DTIC Science & Technology

    1984-03-01

    contribution it intends to make to its shareholders, employees, customers, and communities . Corporate strategy defines the businesses in which a...identifies six factors to consider regarding strategy implementation. How to communicate the 42 .................... . -.......... . corporate goals is...D. Irwin, Inc., 1975. Anthony, R. N., and Welsch, G. A., Fundamentals of Management Accounting, Richard D. Irwin, Inc., 1974. Argenti , J., Corporate

  1. School Planning and Management Buyer's Guide 2000.

    ERIC Educational Resources Information Center

    School Planning and Management, 1999

    1999-01-01

    Presents product information and a suppliers' directory for school purchasing managers for the year 2000, including a detailed product showcase and case histories and a section on descriptions of free brochures, pamphlets, and guides from key suppliers. An advertiser index concludes the issue. (GR)

  2. Habitat planning, maintenance and management working group

    SciT

    NONE

    The Gulf of Mexico (GOM), called {open_quotes}America`s Sea,{close_quotes} is actually a small ocean basin covering over 1.5 million square kilometers. Because of the multiple uses, diversity, and size of the Gulf`s resources, management is shared by a number of governmental agencies including the Minerals Management Service, the Gulf of Mexico Fishery Management Council, the Gulf States Marine Fisheries Commission, National Marine Fisheries Service, the US Coast Guard, the US Army Corps of Engineers, and the five Gulf states fisheries agencies. All of these entities share a common goal of achieving optimum sustainable yield to maximize geological, biological, social, and economicmore » benefits from these resources. These entities also share a common theme that the successful management of the northern GOM requires maintenance and enhancement of both the quantity and quality of habitats. A closer look at the GOM shows the sediment to be clearly dominated by vast sand and mud plains. These soft bottom habitats are preferred by many groundfish and shrimp species and, thus, have given rise to large commercial fisheries on these stocks. Hard bottom and reef habitats, on the other hand, are limited to approximately 1.6% of the total area of the Gulf, so that, while there are high demands by commercial and recreational fishermen for reef associated species, the availability of habitat for these stocks is limited. The thousands of oil and gas structures placed in the Gulf have added significant amounts of new hard substrate. The rigs-to-reefs concept was a common sense idea with support from environmental user groups and the petroleum industry for preserving a limited but valuable habitat type. As long as maximizing long-term benefits from the Gulf s resources for the greatest number of users remains the goal, then programs such as Rigs-to-Reefs will remain an important tool for fisheries and habitat managers in the Gulf.« less

  3. DLA-X Total Quality Management (TQM) Implementation Plan

    DTIC Science & Technology

    1989-07-01

    PAGES TOM (Total Quality Management ), Continuous Process Improvement.( .) 4L-- Administration 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Pr.-cr,bed by ANSI Std ,,fl.f 296-102 DLA-X TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION PLAN o...application of proven Total Quality Management techniques. Quality Policy: Responsibility for quality is delegated to every employee ;11 DLA-X. Every

  4. DPSC (Defense Personnel Support Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    SUBTITLE 5. FUNDING NUMBERS DPSC Total Quality Management Master Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) B. PERFORMING...quality supported solider, sailor, airman and marine. % j cl 1 14. SUBJECT TERMS I 1S. NUMBER OF PAGES TQM (Total Quality Management ), Continuous...THE COMMANDER ON TOTAL QUALITY MANAGEMENT i SECTION I INTRODUCTION 1 II CONCEPTS 6 TQM Basics 7 Continuous Process Improvement 7 DoD TQM Philosophy 9

  5. 20 strategies for marketing your managed care plan.

    PubMed

    Firshein, J

    1996-01-01

    In today's fiercely competitive managed care marketplace, healthcare executives must find a way to set their plans apart from the competition and build a sufficient customer base. At the same time, they must confront a growing anti-managed care backlash among a wary and confused public. Healthcare executive magazine talked with managed care experts to gather their views on key strategies to help executives meet both of these challenges. Here's what they suggest.

  6. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation Area and Alibates... Management Plan, Lake Meredith National Recreation Area and Alibates Flint Quarries National Monument, Texas... management alternatives for Lake Meredith National Recreation Area and three management alternatives for...

  7. 77 FR 38267 - Information Collection; Request for Comment; Objections to New Land Management Plans, Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... System (NFS) lands; local, State, and Tribal governments who have an interest in the plan; Federal agencies with an interest in the management of NFS lands and resources; not-for-profit organizations interested in NFS management, such as environmental groups, recreation groups, educational institutions; and...

  8. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    PubMed

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  9. Physician fees and managed care plans.

    PubMed

    Zwanziger, Jack

    2002-01-01

    One of the objectives of managed care organizations (MCOs) has been to reduce the rate of growth of health care expenditures, including that of physician fees. Yet, due to a lack of data, no one has been able to determine whether MCOs have been successful in encouraging the growth of price competition in the market for physician services in order to slow the growth in physician fees. This study uses a unique, national-level data set to determine what factors influenced the physician fees that MCOs negotiated during the 1990-92 period. The most influential characteristics were physician supply and managed care penetration, which suggest that the introduction of competition into the health care market was an effective force in reducing physician fees.

  10. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...

  11. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...

  12. Recovering from the ShakeOut earthquake

    Wein, Anne; Johnson, Laurie; Bernknopf, Richard

    2011-01-01

    Recovery from an earthquake like the M7.8 ShakeOut Scenario will be a major endeavor taking many years to complete. Hundreds of Southern California municipalities will be affected; most lack recovery plans or previous disaster experience. To support recovery planning this paper 1) extends the regional ShakeOut Scenario analysis into the recovery period using a recovery model, 2) localizes analyses to identify longer-term impacts and issues in two communities, and 3) considers the regional context of local recovery.Key community insights about preparing for post-disaster recovery include the need to: geographically diversify city procurement; set earthquake mitigation priorities for critical infrastructure (e.g., airport), plan to replace mobile homes with earthquake safety measures, consider post-earthquake redevelopment opportunities ahead of time, and develop post-disaster recovery management and governance structures. This work also showed that communities with minor damages are still sensitive to regional infrastructure damages and their potential long-term impacts on community recovery. This highlights the importance of community and infrastructure resilience strategies as well.

  13. Evaluating the co-production of a near real time Earthquake Aftershock forecasting tool for humanitarian risk assessment and emergency planning

    NASA Astrophysics Data System (ADS)

    Quinn, Keira; Hope, Max; McCloskey, John; NicBhloscaidh, Mairead; Jimenez, Abigail; Dunlop, Paul

    2015-04-01

    Concern Worldwide and the University of Ulster Geophysics Research Group are engaged in a project to co-produce a suite of software and mapping tools to assess aftershock hazard in near real-time during the emergency response phase of earthquake disaster, and inform humanitarian emergency planning and response activities. This paper uses a social learning approach to evaluate this co-production process. Following Wenger (1999) we differentiate between the earthquake science and humanitarian communities of practice (CoP) along three dimensions: enterprise (the purpose of CoPs and the problems participants are working to address), repertoire (knowledge, skills, language), and identity (values and boundaries). We examine the effectiveness of learning between CoP, focusing on boundary work and objects, and various organisational structures and aspects of the wider political economy of learning that enable and hinder the co-production process. We conclude by identifying a number of ways to more effectively integrate earthquake science into humanitarian decision-making, policy development and programme design.

  14. Crawler Acquisition and Testing Demonstration Project Management Plan

    SciT

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  15. Planning for Information Resource Management by OSD.

    DTIC Science & Technology

    1987-12-01

    9,129 Objective 1.2- DSS 21,648 23,702 3,893 4,090 4,309 Objective 1.3- Computing 8,197 7,590 435 459 483 Objective 1.4- Distribute messages 75 213 29 ...System DCOAR 26 Office Automation Computer 1,961 3,483 Systems DCOAR 27 Network Performance and 125 454 Capital Budget DCOAR 29 Requirements Analysis...Defense Personnel Analysis 124 167 System ASD(FM&P) 15 Mobilization Training Base 29 63 Cap ASD(FM&P) 16 Manpower Management/ i 8 33 Program Review 01

  16. Los Alamos National Laboratory emergency management plan. Revision 1

    SciT

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents,more » transportation accidents, electrical accidents, and natural disasters.« less

  17. Data management plan for HANDI 2000 business management system

    SciT

    Wilson, D.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.

  18. Vehicle management and mission planning systems with shuttle applications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

  19. Social Impact Management Plans: Innovation in corporate and public policy

    SciT

    Franks, Daniel M., E-mail: d.franks@uq.edu.au; Vanclay, Frank, E-mail: frank.vanclay@rug.nl

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples aremore » analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and

  20. Civil Engineering Work Information Management System (WIMS) Planning Guide,

    DTIC Science & Technology

    1985-04-01

    WORK INFORMATION MANAGEMENT SYSTEM PLANNING GUIDE l-!O L~ JAUG 0)12 13 "’ ’’’ " " 𔄂 5 7 2 2 0 0 9 W WTVF--- DISCLAIMER The views and conclusions...y CHAPTER PAGE I INTRODUCTION What is WIMS? --------------------------------- 1I Why Do We Need A WIMS Planning Guide? ------------ I The Target...Administrator ------------------ 21 6 EQUIPMENT AND SUPPLIES Introduction ------------------------------- 22 Magnetic Media Supplies

  1. Evaluative methodology for comprehensive water quality management planning

    SciT

    Dyer, H. L.

    Computer-based evaluative methodologies have been developed to provide for the analysis of coupled phenomena associated with natural resource comprehensive planning requirements. Provisions for planner/computer interaction have been included. Each of the simulation models developed is described in terms of its coded procedures. An application of the models for water quality management planning is presented; and the data requirements for each of the models are noted.

  2. [Contribution of the rapid diagnostic tests for infectious diseases to the patient management in the Great East Japan earthquake].

    PubMed

    Hatta, Masumitsu; Kaku, Mitsuo

    2012-01-01

    On 11 March 2011, an earthquake measuring 9.0 on the Richter scale off the northeast coast of Honshu Island, Japan, produced a devastating tsunami that destroyed many towns and villages near the coast in Iwate, Miyagi, and Fukushima prefectures. Miyagi Prefecture was the area most severely devastated by the tsunami, with extensive loss of life and property; hundreds of thousands of people lost their houses and were forced to move to evacuation areas. In the days and weeks following devastating natural disasters, the threat of infectious disease outbreak is high. Rapid diagnostic tests can be performed at or near the site of patient care and the tests were very useful in this disaster, because they enabled us to manage patients appropriately in the settings where medical resources were limited. Here we report actual cases where the rapid diagnostic tests for infectious diseases were useful in the patient management.

  3. Are care plans suitable for the management of multiple conditions?

    PubMed Central

    Young, Charlotte E.; Boyle, Frances M.; Mutch, Allyson J.

    2016-01-01

    Background Care plans have been part of the primary care landscape in Australia for almost two decades. With an increasing number of patients presenting with multiple chronic conditions, it is timely to consider whether care plans meet the needs of patients and clinicians. Objectives To review and benchmark existing care plan templates that include recommendations for comorbid conditions, against four key criteria: (i) patient preferences, (ii) setting priorities, (iii) identifying conflicts and synergies between conditions, and (iv) setting dates for reviewing the care plan. Design Document analysis of Australian care plan templates published from 2006 to 2014 that incorporated recommendations for managing comorbid conditions in primary care. Results Sixteen templates were reviewed. All of the care plan templates addressed patient preference, but this was not done comprehensively. Only three templates included setting priorities. None assisted in identifying conflicts and synergies between conditions. Fifteen templates included setting a date for reviewing the care plan. Conclusions Care plans are a well-used tool in primary care practice, but their current format perpetuates a single-disease approach to care, which works contrary to their intended purpose. Restructuring care plans to incorporate shared decision-making and attention to patient preferences may assist in shifting the focus back to the patient and their care needs. PMID:29090181

  4. Collaborative socioeconomic tool development to address management and planning needs

    Richardson, Leslie A.; Huber, Christopher; Cullinane Thomas, Catherine; Donovan, Elizabeth; Koontz, Lynne M.

    2014-01-01

    Public lands and resources managed by the National Park Service (NPS) and other land management agencies provide a wide range of social and economic benefits to both nearby local communities and society as a whole, ranging from job creation, to access to unique recreational opportunities, to subsistence and tribal uses of the land. Over the years, there has been an increased need to identify and analyze the socioeconomic effects of the public’s use of NPS lands and resources, and the wide range of NPS land management decisions. This need stems from laws such as the National Environmental Policy Act (NEPA), increased litigation and appeals on NPS management decisions, as well as an overall need to demonstrate how parks benefit communities and the American public. To address these needs, the U.S. Geological Survey (USGS) and NPS have an ongoing partnership to collaboratively develop socioeconomic tools to support planning needs and resource management. This article discusses two such tools. The first, Assessing Socioeconomic Planning Needs (ASPN), was developed to help NPS planners and managers identify key social and economic issues that can arise as a result of land management actions. The second tool, the Visitor Spending Effects (VSE) model, provides a specific example of a type of analysis that may be recommended by ASPN. The remainder of this article discusses the development, main features, and plans for future versions and applications of both ASPN and the VSE.

  5. Planning and management of science programs on Skylab

    NASA Technical Reports Server (NTRS)

    Parker, R. A. R.; Sevier, J. R.

    1974-01-01

    Discussion of the experience gained in experiment operation planning during the Skylab mission. The Skylab flight planning activity allowed the experimenters to interact with the system and provided the flexibility to respond to contingencies both major and minor. Both these aspects contributed to make efficient use of crew time thus helping to increase the science return from the mission. Examples of the need for real time scheduling response and of the tradeoffs considered between conflicting experiment requirements are presented. General management principles derived from this experience are developed. The Skylab mission experiences, together with previous Apollo mission experiences, are shown to provide a good background for Shuttle flight planning.

  6. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...

  7. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  8. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  9. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  10. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...

  11. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  12. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  13. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  14. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  15. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  16. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  17. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must my waste management plan be... Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your...

  18. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...

  19. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for... Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  20. The EPA-Wide Plan to Provide Solid Waste Management Capacity Assistance to Tribes

    EPA Pesticide Factsheets

    This Plan is a strategy for building tribal capacity to manage solid waste. The Plan promotes the development and implementation of integrated waste management plans and describes how EPA will prioritize its resources to maximize environmental benefits.

  1. Role of the Internet in Anticipating and Mitigating Earthquake Catastrophes, and the Emergence of Personal Risk Management (Invited)

    NASA Astrophysics Data System (ADS)

    Rundle, J. B.; Holliday, J. R.; Donnellan, A.; Graves, W.; Tiampo, K. F.; Klein, W.

    2009-12-01

    Risks from natural and financial catastrophes are currently managed by a combination of large public and private institutions. Public institutions usually are comprised of government agencies that conduct studies, formulate policies and guidelines, enforce regulations, and make “official” forecasts. Private institutions include insurance and reinsurance companies, and financial service companies that underwrite catastrophe (“cat”) bonds, and make private forecasts. Although decisions about allocating resources and developing solutions are made by large institutions, the costs of dealing with catastrophes generally fall for the most part on businesses and the general public. Information on potential risks is generally available to the public for some hazards but not others. For example, in the case of weather, private forecast services are provided by www.weather.com and www.wunderground.com. For earthquakes in California (only), the official forecast is the WGCEP-USGS forecast, but provided in a format that is difficult for the public to use. Other privately made forecasts are currently available, for example by the JPL QuakeSim and Russian groups, but these efforts are limited. As more of the world’s population moves increasingly into major seismic zones, new strategies are needed to allow individuals to manage their personal risk from large and damaging earthquakes. Examples include individual mitigation measures such as retrofitting, as well as microinsurance in both developing and developed countries, as well as other financial strategies. We argue that the “long tail” of the internet offers an ideal, and greatly underutilized mechanism to reach out to consumers and to provide them with the information and tools they need to confront and manage seismic hazard and risk on an individual, personalized basis. Information of this type includes not only global hazard forecasts, which are now possible, but also global risk estimation. Additionally

  2. [Infrastructure and contents of clinical data management plan].

    PubMed

    Shen, Tong; Xu, Lie-dong; Fu, Hai-jun; Liu, Yan; He, Jia; Chen, Ping-yan; Song, Yu-fei

    2015-11-01

    Establishment of quality management system (QMS) plays a critical role in the clinical data management (CDM). The objectives of CDM are to ensure the quality and integrity of the trial data. Thus, every stage or element that may impact the quality outcomes of clinical studies should be in the controlled manner, which is referred to the full life cycle of CDM associated with the data collection, handling and statistical analysis of trial data. Based on the QMS, this paper provides consensus on how to develop a compliant clinical data management plan (CDMP). According to the essential requirements of the CDM, the CDMP should encompass each process of data collection, data capture and cleaning, medical coding, data verification and reconciliation, database monitoring and management, external data transmission and integration, data documentation and data quality assurance and so on. Creating and following up data management plan in each designed data management steps, dynamically record systems used, actions taken, parties involved will build and confirm regulated data management processes, standard operational procedures and effective quality metrics in all data management activities. CDMP is one of most important data management documents that is the solid foundation for clinical data quality.

  3. Rainwater Wildlife Area Management Plan : Executive Summary.

    SciT

    Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

    The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Actmore » directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.« less

  4. Advanced Hybrid Particulate Collector Project Management Plan

    SciT

    Miller, S.J.

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the bestmore » method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting« less

  5. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  6. Configuration management program plan for Hanford site systems engineering

    SciT

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  7. System integration test plan for HANDI 2000 business management system

    SciT

    Wilson, D.

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  8. Integrating fire management into land management planning for west-side forests

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...

  9. Identifying critical issues in recreation planning and management: improving the management-research partnership

    John H. Schomaker; David W. Lime

    1988-01-01

    The "nominal group" process is a proven technique to systematically arrive at a consensus about critical information needs in recreation planning and management. Using this process, 41 managers who attended a 1983 conference on river management identified 114 specific information needs grouped under 11 general questions. Clearly, some concerns of...

  10. Health plan approach to operationalizing a specialty drug management program.

    PubMed

    Tegenu, Mesfin

    2008-05-01

    Expenditures related to specialty drugs consume a significant percentage of available health care resources. Explain the process of transitioning the management of specialty drugs from medical services to pharmacy services in 2 managed care plans and provide insight into the issues encountered and solutions implemented based on 6 years of experience using traditional and innovative pharmacy utilization management tools to insure appropriate specialty drug use and reimbursement. The level of involvement in a specialty management program varies from managing only products dispensed by the retail, mail, and specialty pharmacy vendor to encompassing a broad list of specialty drugs distributed through a variety of channels. Efficient administrative, operational, and clinical processes are critical to the success of the program. Additionally, an accurate and timely claims processing procedure is also essential for success as is the ability to mine data and effectively report on the use of specialty products. A clinically sound, cost-effective, and patient-friendly program requires input from health plan members, pharmacy service leaders, and physician providers, and must overcome challenges associated with disrupting current relationships and removing competing incentives. A well-constructed and properly funded specialty drug management program results in clinical and financial benefits for the plan.

  11. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  12. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  13. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  14. An Update on Asset Management Plans in the United Kingdom.

    ERIC Educational Resources Information Center

    Patel, Mukund

    1999-01-01

    Describes a current project in the United Kingdom designed to improve school buildings. The use of Asset Management Plans (AMPs) in providing the means through which likely future needs are assessed, criteria for prioritization are set, and informed decisions on local spending are made are examined. (GR)

  15. Organization Development Strategies in Educational Policy Planning and Management.

    ERIC Educational Resources Information Center

    Jones, B. Kathryn; Biles, Stephen

    1990-01-01

    This synthesis reviews organizational development (OD) and its decision tools, describes OD applications in educational organizations, explores OD's limitations, and predicts how OD will influence future educational decision making. Findings identify eight specific management and planning areas where OD can be used to improve organizational…

  16. Planning and Time Management: Keys to Effective Educational Leadership.

    ERIC Educational Resources Information Center

    Sergiovanni, Thomas J.

    1980-01-01

    Educational administrators' concern with planning and time management results from the fragmentation of their daily activities, which research has documented, and their consequent search for order and control. Time is important because its scarcity affects productivity and its use has social-psychological effects on staffs' perceptions of…

  17. FOCUS: a fire management planning system -- final report

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  18. Multi-Institution Research Centers: Planning and Management Challenges

    ERIC Educational Resources Information Center

    Spooner, Catherine; Lavey, Lisa; Mukuka, Chilandu; Eames-Brown, Rosslyn

    2016-01-01

    Funding multi-institution centers of research excellence (CREs) has become a common means of supporting collaborative partnerships to address specific research topics. However, there is little guidance for those planning or managing a multi-institution CRE, which faces specific challenges not faced by single-institution research centers. We…

  19. Proposed Modification to Sebade Farms Nutrient Management Plan

    EPA Pesticide Factsheets

    Sebade Farms is a concentrated animal feeding operation (CAFO) located on the Winnebago Reservation in Nebraska that confines a total of 6,500 head of cattle. The terms of the Nutrient Management Plan (NMP) are incorporated by reference into the facility’s

  20. Environmental Development cum Forest Plantation Planning and Management.

    ERIC Educational Resources Information Center

    Katoch, C. D.

    This textbook covers environmental conservation through forest plantation planning and management for all levels of forestry professionals and non-professionals in India and abroad. The book is divided into six parts and 29 sections in sequential order. Part I contains details on site selection, site preparations, site clearance, layout, and…

  1. National Risk Management Research Laboratory Strategic plan and Implementation - Overview

    EPA Science Inventory

    This publication provides an overview of the strategic plan recently developed by the National Risk Management Research Laboratory (NRMRL). It includes a description of NRMRL's mission and goals and their alignment with Agency goals. Additionally, the overview contains a brief se...

  2. Harvesting costs for management planning for ponderosa pine plantations.

    Roger D. Fight; Alex Gicqueau; Bruce R. Hartsough

    1999-01-01

    The PPHARVST computer application is Windows-based, public-domain software used to estimate harvesting costs for management planning for ponderosa pine (Pinus ponderosa Dougl. ex Laws.) plantations. The equipment production rates were developed from existing studies. Equipment cost rates were based on 1996 prices for new...

  3. Examining the Planning and Management of Principal Succession

    ERIC Educational Resources Information Center

    Zepeda, Sally J.; Bengtson, Ed; Parylo, Oksana

    2012-01-01

    Purpose: The purpose of this study is to examine principal succession planning and management by analyzing current practices of handling school leader succession in four Georgia school systems. Design/methodology/approach: Looking through the lens of organizational leadership succession theory, the practices of school systems as they experienced…

  4. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL...) Describe water and related land resources problems, needs and opportunities, and the priorities proposed...

  5. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL...) Describe water and related land resources problems, needs and opportunities, and the priorities proposed...

  6. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL...) Describe water and related land resources problems, needs and opportunities, and the priorities proposed...

  7. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL...) Describe water and related land resources problems, needs and opportunities, and the priorities proposed...

  8. Asset Management Plans, Appraisal Guidance for 2003-04.

    ERIC Educational Resources Information Center

    Department for Education and Skills, London (England).

    This document is one in a series which aims to assist Local Authorities in Britain with asset management planning (AMPs) for schools. AMPs set out the information needed, and the criteria used, to make decisions about spending on school premises. The document provides guidance on the appraisal of school AMPs in 2002 to inform 3-year formulaic…

  9. Policy, Planning and Management of Education in Small States.

    ERIC Educational Resources Information Center

    Lillis, Kevin M., Ed.

    This book offers a range of original perspectives on issues of planning and managing education in small systems. It is based on the proceedings of a conference held at the University of London's Institute for Education, supported by the European Community Directorate General for Development. The conference addressed a range of themes relevant to…

  10. Timber management planning with timber ram and goal programming

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  11. Management Planning and Control: Supporting Knowledge-Intensive Organizations

    ERIC Educational Resources Information Center

    Herremans, Irene M.; Isaac, Robert G.

    2005-01-01

    Purpose: The purpose of this paper is to develop propositions for empirical validation regarding appropriate management planning and control systems (MPACS) in knowledge-intensive organizations. Design/methodology/approach: The propositions were developed from interviews with members of a knowledge-intensive virtual organization that is known for…

  12. VDOT manual of practice for planning stormwater management.

    DOT National Transportation Integrated Search

    1992-01-01

    The final report is in the form of a manual of practice for the VDOT to use in planning its stormwater management strategies. The manual was proposed to aid in the selection and design of erosion control practices and stormwater control practices for...

  13. POSTER FOR NRMRL QUALITY MANAGEMENT PLAN (QMP) TRAINING COURSE

    EPA Science Inventory


    NRMRL QMP Training Course
    Contact: Lauren Drees, NRMRL/STD (drees.lauren@epa.gov)

    NRMRL has developed a computer-based course to train personnel in the requirements of the NRMRL Quality Management Plan (QMP). This training course was developed using Trainersoft s...

  14. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and recycling of paper, cardboard, plastics, glass, batteries, food waste, and metals (e.g., aluminum cans, metals-containing devices); segregation of non-recyclable wastes (e.g., polychlorinated biphenyl... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Waste management plan. 60.55c Section...

  15. General RMP Guidance - Chapter 9: Risk Management Plan

    EPA Pesticide Factsheets

    You must submit one risk management plan (RMP) to EPA for all of your covered processes. The internet-based RMP*eSubmit allows you to submit your RMP in EPA's Central Data Exchange (CDX), where you can access and change/correct existing RMPs.

  16. A Model for Talent Management and Career Planning

    ERIC Educational Resources Information Center

    Waheed, Sajjad; Zaim, A. Halim

    2015-01-01

    This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…

  17. ENVIRONMENTAL METHODS TESTING SITE PROJECT: DATA MANAGEMENT PROCEDURES PLAN

    EPA Science Inventory

    The Environmental Methods Testing Site (EMTS) Data Management Procedures Plan identifies the computer hardware and software resources used in the EMTS project. It identifies the major software packages that are available for use by principal investigators for the analysis of data...

  18. Recommendations for Emergency Management Planning for School Facilities.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    Numerous events, such as hurricanes, floods, and tornadoes, constitute a natural disaster for public schools. Human-caused disasters include hazardous-material emergencies, civil riots, fires, and nuclear accidents. This document contains emergency-management planning guidelines, developed by the Texas Education Agency, to help local school…

  19. Leadership development and succession planning in case management.

    PubMed

    Miodonski, Kathleen; Hines, Patricia

    2013-01-01

    The director of case management is one of health care's leadership positions most frequently in demand. The lack of qualified and effective case management leaders will continue to be an issue for organizations for years to come, influenced by increasing pressures on health care reimbursement and the aging case management workforce. Organizations have an opportunity to create a program to develop future case management leaders from their internal talent. The proposed strategies are designed for the acute care hospital but also have applicability in other health care settings where there are case managers and a need for case management leadership. The business community offers leadership research and leadership development models with relevance to case management. Identifying and developing internal talent for leadership roles has been proven to be effective in preparation for advanced responsibilities, has a positive effect on staff morale, and minimizes the impact of vacant leadership positions during recruitment and onboarding activities. Creating a case management leadership development program for an organization can be an alternative to the process of external recruitment for case management department leaders. Such a program can be undertaken even in today's budget conscious environment by accessing existing resources in an organization in a creative and organized manner. The authors outline an approach for case management leaders to accept responsibility for succession planning and for case managers to accept responsibility for promoting their own career development through creation of a leadership development program.

  20. A Management Plan for Historic Bridges in Virginia: Update / Scoping Phase.

    DOT National Transportation Integrated Search

    2014-04-01

    "The Management Plan for Historic Bridges in Virginia, completed in 2001 (hereinafter the 2001 Management Plan), : identified the management and treatment needs for 54 bridges in Virginia that were individually eligible for or listed on the National ...

  1. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  2. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  3. 76 FR 38685 - Draft General Management Plan Amendment/Environmental Impact Statement, Tumacacori National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... experience at Tumacacori by developing access to these associated mission resources. A general management... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan Amendment... Management Plan, Tumacacori National Historical Park, in favor of an Environmental Assessment. SUMMARY: The...

  4. Modified allocation capacitated planning model in blood supply chain management

    NASA Astrophysics Data System (ADS)

    Mansur, A.; Vanany, I.; Arvitrida, N. I.

    2018-04-01

    Blood supply chain management (BSCM) is a complex process management that involves many cooperating stakeholders. BSCM involves four echelon processes, which are blood collection or procurement, production, inventory, and distribution. This research develops an optimization model of blood distribution planning. The efficiency of decentralization and centralization policies in a blood distribution chain are compared, by optimizing the amount of blood delivered from a blood center to a blood bank. This model is developed based on allocation problem of capacitated planning model. At the first stage, the capacity and the cost of transportation are considered to create an initial capacitated planning model. Then, the inventory holding and shortage costs are added to the model. These additional parameters of inventory costs lead the model to be more realistic and accurate.

  5. An Operational Framework for Insecticide Resistance Management Planning

    PubMed Central

    Chanda, Emmanuel; Thomsen, Edward K.; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G.; Norris, Douglas E.; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H.; Muleba, Mbanga; Craig, Allen; Govere, John M.; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B.

    2016-01-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future. PMID:27089119

  6. An Operational Framework for Insecticide Resistance Management Planning.

    PubMed

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future.

  7. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    NASA Technical Reports Server (NTRS)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  8. Total Quality Management Implementation Plan: DLA-N

    DTIC Science & Technology

    1989-07-01

    e Wastimto , n. Othe 20 Seato3 4. TITLE AND SUBTITLE S. FUNDING NUMBERS DLA-N Total Quality Management 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S...PAGES TQM (Total Quality Management ), Continuous Process Improvement.(; , Defense National Stockpile 16. PRICE CODEI17. SECURITY CLASSIFICATION 18...IUNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) pr"!Cbed ty ANSI Std Z39’B6 296-102 DLA - N TOTAL QUALITY MANAGEMENT IMPLEMENTATION PLAN I

  9. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning...; (iv) Open space and recreation; (v) Energy use and conservation; (vi) Floodplain and wetlands...

  10. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    SciT

    Urban, Mary Elizabeth

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less

  11. The integrated rangeland fire management strategy actionable science plan

    Aldridge, Cameron L.; Berg, Ken; Boyd, Chad S.; Boyte, Stephen P.; Bradford, John B.; Brunson, Ed; Cissel, John H.; Conway, Courtney J.; Chalfoun, Anna D.; Chambers, Jeanne C.; Clark, Patrick; Coates, Peter S.; Crist, Michele R.; Davis, Dawn M.; DeCrappeo, Nicole; Deibert, Patricia A.; Doherty, Kevin E.; Evers, Louisa B.; Finch, Deborah M.; Finn, Sean P.; Germino, Matthew J.; Glenn, Nancy F.; Gucker, Corey; Hall, John A.; Hanser, Steven E.; Havlina, Douglas W.; Heinrichs, Julie; Heller, Matt; Homer, Collin G.; Hunter, Molly E.; Jacobs, Ruth W.; Karl, Jason W.; Kearney, Richard; Kemp, Susan K; Kilkenny, Francis F.; Knick, Steven T.; Launchbaugh, Karen; Manier, Daniel J.; Mayer, Kenneth E.; Meyer, Susan E.; Monroe, Adrian; MontBlanc, Eugénie; Newingham, Beth A.; Pellant, Michael L.; Phillips, Susan L.; Pilliod, David S.; Ricca, Mark A.; Richardson, Bryce A.; Rose, Jeffrey A.; Shaw, Nancy; Sheley, Roger L.; Shinneman, Douglas J.; Wiechman , Lief A.; Wylie, Bruce K.

    2016-01-01

    The Integrated Rangeland Fire Management Strategy (hereafter Strategy, DOI 2015) outlined the need for coordinated, science-based adaptive management to achieve long-term protection, conservation, and restoration of the sagebrush (Artemisia spp.) ecosystem. A key component of this management approach is the identification of knowledge gaps that limit implementation of effective strategies to meet current management challenges. The tasks and actions identified in the Strategy address several broad topics related to management of the sagebrush ecosystem. This science plan is organized around these topics and specifically focuses on fire, invasive plant species and their effects on altering fire regimes, restoration, sagebrush and greater sage-grouse (Centrocercus urophasianus), and climate and weather.

  12. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ....HAG11-0203] Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning... Planning Area and by this notice is announcing the beginning of the scoping process to solicit public comments and identify issues. The West Eugene Wetlands Planning Area comprises approximately 1,340 acres of...

  13. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Eligible planning, urban... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning...

  14. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    PubMed

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  15. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  16. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  17. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  18. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  19. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  20. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What is a waste management plan? 62...

  1. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  2. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must my waste management plan be... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On Or Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed...

  3. 76 FR 50494 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Resources Management Plan/Environmental Impact Statement for Mojave National Preserve. SUMMARY: Pursuant to... preparing a Water Resources Management Plan/Environmental Impact Statement (WRMP/EIS). This plan is intended...

  4. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective.

    PubMed

    Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers.

  5. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective

    PubMed Central

    Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers. PMID:26807848

  6. Leadership and management curriculum planning for Iranian general practitioners.

    PubMed

    Khosravan, Shahla; Karimi Moonaghi, Hossein; Yazdani, Shahram; Ahmadi, Soleiman; Mansoorian, Mohammad Reza

    2015-10-01

    Leadership and management are two expected features and competencies for general practitioners (GPs). The purpose of this study was leadership and management curriculum planning for GPs which was performed based on Kern's curriculum planning cycle. This study was conducted in 2011- 2012 in Iran using an explanatory mixed-methods approach. It was conducted through an initial qualitative phase using two focus group discussions and 28 semi-structured interviews with key informants to capture their experiences and viewpoints about the necessity of management courses for undergraduate medical students, goals, objectives, and educational strategies according to Kern's curriculum planning cycle. The data was used to develop a questionnaire to be used in a quantitative written survey. Results of these two phases and that of the review of medical curriculum in other countries and management curriculum of other medical disciplines in Iran were used in management and leadership curriculum planning. In the qualitative phase, purposeful sampling and content analysis with constant comparison based on Strauss and Corbin's method were used; descriptive and analytic tests were used for quantitative data by SPSS version 14. In the qualitatively stage of  this research, 6 main categories including the necessity of management course, features and objectives of management curriculum, proper educational setting, educational methods and strategies, evolutionary method and feedback result were determined. In the quantitatively stage of the research, from the viewpoints of 51.6% of 126 units of research who filled out the questionnaire, ranked high necessary of management courses. The coordination of care and clinical leadership was determined as the most important role for GPs with a mean of 6.2 from sample viewpoint. Also, team working and group dynamics had the first priority related to the principles and basics of management with a mean of 3.59. Other results were shown in the paper

  7. [Ethical principles of management and planning during influenza pandemic].

    PubMed

    Kubar', O I; Asatrian, A Zh

    2012-01-01

    The article is dedicated to an actual problem of ethical component inclusion into the system of management and planning of epidemic control measures during threat emergence and in the course of influenza pandemic (epidemic) progress. Data regarding development of international ethical guidelines during influenza including WHO recommendations are presented and analysis of normative documents in Russian Federation is given. A necessity of comprehension and accounting of ethical values in pandemic preparedness is shown, main directions of action and responsibility are revealed. Key ethical positions of planning and implementation of measures during influenza pandemic are outlined, compliance with those determines the level of public support and thus provides the effectiveness of the implemented measures.

  8. Planned early delivery versus expectant management for monoamniotic twins.

    PubMed

    Shub, Alexis; Walker, Susan P

    2015-04-23

    Monoamniotic twin pregnancies are formed when a single egg is fertilised and the resulting inner cell mass splits to form twins sharing the same amniotic sac. This condition is rare and affects about one in 10,000 pregnancies overall. Monoamniotic twin pregnancies are susceptible to complications including cord entanglement, increased congenital anomalies, intrauterine growth restriction, twin-to-twin transfusion syndrome and increased perinatal mortality. All twin pregnancies also carry additional maternal risks including pre-eclampsia, anaemia, antepartum haemorrhage, postpartum haemorrhage and operative delivery.The optimal timing for the delivery of monoamniotic twins is not known. The options include 'planned early delivery' between 32 and 34 weeks, or alternatively awaiting spontaneous labour at least up until the usual time of planned delivery for other monochorionic twins (approximately 36 to 38 weeks' gestation), unless there is a specific indication for earlier delivery. To assess whether routine early delivery in monoamniotic twin pregnancies improves fetal, neonatal or maternal outcomes compared with 'expectant management'. Expectant management means awaiting spontaneous labour at least up until the usual time of planned delivery for other monochorionic twins (approximately 36 to 38 weeks' gestation in many centres), unless a specific indication for delivery occurs in the meantime, e.g. for non-reassuring antenatal testing. We searched the Cochrane Pregnancy and Childbirth Group's Trials Register (31 March 2015). Published and unpublished randomised controlled trials (including cluster-randomised trials) comparing outcomes for women and infants who were randomised to planned early delivery of a monoamniotic twin pregnancy with outcomes for women and infants who were randomised to either planned term delivery or expectant management. However, we did not identify any trials for inclusion in this review.Quasi-randomised controlled trials, trials published

  9. Is population flow an unintended consequence of alcohol management plans?

    PubMed

    Usher, Kim; Woods, Cindy; Lynch, Paul; Pointing, Shane Boris; Budden, Lea; Barker, Ruth; Catchpoole, Jesani; Clough, Alan

    2017-03-01

    The aim of this study was to gauge whether, and to what extent, population flow occurred as a result of the implementation of alcohol management plans in Indigenous communities. Alcohol management plans involving carriage limits and dry places were introduced into 15 Queensland Indigenous communities between 2002-2004. Controls on alcohol availability were further tightened between 2008-2010, seeing the closure of eight mainly remote community taverns/canteens. A retrospective observational study was undertaken using data from the Queensland Injury Surveillance Unit. Population flow was measured by changing patterns of alcohol-related injuries in a mining region near dry Indigenous communities following the introduction of alcohol management plans and a control mining region distant from Indigenous communities with alcohol management plans. Data were analysed using descriptive and inferential statistics. Logistic regression was used for the comparison of the characteristics between the emergency department presentations. The rates of alcohol-related injury presentations per 1000/population were calculated and age-standardised to the Australian population. Between the five-year periods 2003-2007 and 2008-2012, alcohol-related injury presentations to the Mount Isa emergency department trebled from an age-adjusted average annual rate of 9·5/1000 in the region's population to 27·1/1000 population. In the control region, alcohol-related emergency department injury presentations did not increase to the same degree with age-adjusted average annual rates of 1·42/1000 and 2·21/1000, respectively. The 10-year pattern of emergency department presentations for alcohol-related injuries increased significantly in the Mount Isa region compared with the control region. Further research should investigate the impacts of population flow related to Indigenous community alcohol management plans. Although initiatives such as alcohol management plans have been implemented to reduce

  10. Evacuation and Risk of Hypertension After the Great East Japan Earthquake: The Fukushima Health Management Survey.

    PubMed

    Ohira, Tetsuya; Hosoya, Mitsuaki; Yasumura, Seiji; Satoh, Hiroaki; Suzuki, Hitoshi; Sakai, Akira; Ohtsuru, Akira; Kawasaki, Yukihiko; Takahashi, Atsushi; Ozasa, Kotaro; Kobashi, Gen; Hashimoto, Shigeatsu; Kamiya, Kenji; Yamashita, Shunichi; Abe, Masafumi

    2016-09-01

    On March 11, 2011, the Great East Japan Earthquake occurred in Japan, with a nuclear accident subsequently occurring at the Fukushima Daiichi Nuclear Power Plant. The disaster forced many evacuees to change particular aspects of their lifestyles. This study assessed the hypothesis that evacuation may have increased the risk of hypertension among residents in Fukushima. A longitudinal study examined data collected from 31 252 Japanese participants aged 40 to 74 years sourced from general health checkups conducted in 13 communities between 2008 and 2010. Follow-up examinations were conducted from 2011 through 2013. A total of 21 989 participants (follow-up proportion, 70.4%) received follow-up examinations. Mean blood pressure significantly increased in both evacuees and nonevacuees after the disaster, with greater changes in blood pressure among the former. The changes in systolic and diastolic blood pressure among the evacuees and nonevacuees were +5.8/3.4 versus +4.6/2.1 mm Hg (P<0.01/P<0.0001) for men and +4.4/2.8 versus +4.1/1.7 mm Hg (P=0.33/P<0.0001) for women, respectively. Evacuation was associated with an increased risk of hypertension among men, and the age-adjusted hazard ratios of evacuation for incidence of hypertension were 1.24 (95% confidence interval, 1.11-1.39; P<0.001) for men and 1.05 (95% confidence interval, 0.94-1.17; P=0.37) for women, respectively. For men, after adjustment for confounding variables, the hazard ratio slightly decreased to 1.20, but the association was essentially unchanged. Blood pressure increased among residents, especially evacuees, in the evacuation zone of Fukushima prefecture after the Great East Japan Earthquake. Evacuation may be associated with an increased risk of hypertension among men in the 2 years after the disaster. © 2016 American Heart Association, Inc.

  11. 25 CFR 166.311 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166.311 Is an Indian agricultural resource management plan required? (a) Indian agricultural land under... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan...

  12. 30 CFR 71.301 - Respirable dust control plan; approval by District Manager and posting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... District Manager and posting. 71.301 Section 71.301 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... plan; approval by District Manager and posting. (a) The District Manager will approve respirable dust control plans on a mine-by-mine basis. When approving respirable dust control plans, the District Manager...

  13. 40 CFR 62.14585 - When must I submit my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...

  14. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...

  15. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...

  16. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  17. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...

  18. 40 CFR 62.14585 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...

  19. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  20. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...

  1. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing...

  2. 40 CFR 60.2625 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2625 When must I submit my waste management plan? You must submit a waste management plan no...

  3. 40 CFR 62.14585 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...

  4. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  5. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing...

  6. 40 CFR 62.14585 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...

  7. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  8. 40 CFR 60.2625 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2625 When must I submit my waste management plan? You must submit a waste management plan no later than the date specified in table 1 of this...

  9. 40 CFR 60.2060 - When must I submit my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...

  10. 40 CFR 60.2060 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...

  11. 40 CFR 60.2060 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...

  12. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for..., 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...

  13. 25 CFR 161.200 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... resource management plan required? (a) Yes, Navajo Partitioned Lands must be managed in accordance with the goals and objectives in the agricultural resource management plan developed by the Navajo Nation, or by...

  14. Resource management plan for the Oak Ridge Reservation

    SciT

    Parr, P.D.; Evans, J.W.

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selectedmore » species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.« less

  15. Population and business exposure to twenty scenario earthquakes in the State of Washington

    Wood, Nathan; Ratliff, Jamie

    2011-01-01

    This report documents the results of an initial analysis of population and business exposure to scenario earthquakes in Washington. This analysis was conducted to support the U.S. Geological Survey (USGS) Pacific Northwest Multi-Hazards Demonstration Project (MHDP) and an ongoing collaboration between the State of Washington Emergency Management Division (WEMD) and the USGS on earthquake hazards and vulnerability topics. This report was developed to help WEMD meet internal planning needs. A subsequent report will provide analysis to the community level. The objective of this project was to use scenario ground-motion hazard maps to estimate population and business exposure to twenty Washington earthquakes. In consultation with the USGS Earthquake Hazards Program and the Washington Division of Geology and Natural Resources, the twenty scenario earthquakes were selected by WEMD (fig. 1). Hazard maps were then produced by the USGS and placed in the USGS ShakeMap archive.

  16. The East Bay Vegetation Management Consortium:\\ta subregional approach to resource management and planning

    Tony Acosta

    1995-01-01

    Formed in response to the October 20, 1991, Oakland/Berkeley hills firestorm, the East Bay Vegetation Management Consortium (EBVMC) is a voluntary association of public agencies concerned with vegetation management and planning related to fire hazard reduction in the Oakland/ Berkeley hills. To date, a total of nine agencies are participating in the EBVMC, including...

  17. Helpful Hints for School Emergency Management: Steps for Developing a School Emergency Management Plan

    ERIC Educational Resources Information Center

    US Department of Education, 2007

    2007-01-01

    "Helpful Hints" offers a quick overview of school emergency preparedness topics that are frequently the subject of inquiries. The U.S. Department of Education's Office of Safe and Drug-Free Schools strongly encourages schools and school districts to develop emergency management plans within the context of the four phases of emergency management:…

  18. Management plan for White Oak Dam. Revision 1

    SciT

    Ahmed, S.B.

    1997-03-01

    The purpose is to provide operation and maintenance, periodic inspection, and emergency action plans for White Oak Dam in general accordance with the Federal Emergency Management Agency (FEMA) guidelines for dam safety. It must be understood that operations at the site are primarily for purposes of environmental monitoring, environmental protection and waste management operations control. Effluent is generally allowed to flow from the lake at its natural rate by rising above the broad crested weir notch elevation of 744 feet m.s.l.

  19. Spent nuclear fuel project high-level information management plan

    SciT

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM

  20. Data Integration Framework Data Management Plan Remote Sensing Dataset

    DTIC Science & Technology

    2016-07-01

    performed by the Coastal Observations and Analysis Branch (CEERD-HFA) of the Flood and Storm Protection Division (CEERD-HF), U.S. Army Engineer Research... Protection Division, Coastal Observations and Analysis Branch CESAM U.S. Army Corps of Engineers, Mobile District CESAM-OP-J U.S. Army Corps of Engineers...ER D C/ CH L SR -1 6- 2 Coastal Ocean Data Systems Program Data Integration Framework Data Management Plan Remote Sensing Dataset Co